=== page 1 === 441 G St. N.W. Washington, DC 20548 B-331343 April 27, 2020 The Honorable Michael R. Pence President of the Senate The Honorable Nancy Pelosi Speaker of the House of Representatives Subject: Fiscal Year 2019 Antideficiency Act Reports Compilation Agencies that violate the Antideficiency Act must report the violation to the President and Congress and transmit a copy of the report to the Comptroller General at the same time. 31 U.S.C. §§ 1351, 1517(b). The report must contain all relevant facts and a statement of actions taken. Since fiscal year 2005, GAO, in its role as repository for the Antideficiency Act reports that agencies submit, has produced and publicly released an annual compilation of summaries of the reports. We base the summaries on unaudited information extracted from the agency reports. Each summary includes a brief description of the violation and of remedial actions agencies report that they have taken. We also include copies of the agencies’ transmittal letters. We post the summaries and the agency transmittal letters on our public web site. In some cases, the agencies also sent us additional materials to accompany their transmittal letters. We will make these additional materials available to Members and their staffs upon request. Please find enclosed the compilation of summaries of the nine Antideficiency Act violation reports and agency transmittal letters submitted to GAO in fiscal year 2019. GAO has not opined on the violations reported or the remedial actions taken. If you have any questions, please do not hesitate to contact Shirley A. Jones, Managing Associate General Counsel, at (202) 512-8156, or Omari Norman, Assistant General Counsel for Appropriations Law, at (202) 512-8272. Thomas H. Armstrong General Counsel Enclosure === page 2 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-01 Agency No.: Navy, 16-01 Date Reported to GAO: October 4, 2018 Agency: Department of the Navy (Navy) Date(s) of Violation(s): Fiscal Year 2006 Account(s): Procurement, Marine Corps Amount Reported: $339,692 Description: The Navy, through the Department of Defense, reported that it violated the Antideficiency Act (ADA) when it obligated the incorrect appropriation to partially pay for the construction of a new facility at Marine Corps Base Camp Pendleton. The construction project was initially characterized as a temporary, relocatable training facility, which would have required that the building be readily movable, erected, disassembled, stored, and reusable. However, the second floor of the facility was constructed using concrete, making it non-relocatable. Accordingly, the Navy reported that the project should have been characterized as a minor military construction project and exclusively paid for using Operation and Maintenance, Marine Corps appropriation. Instead, the Marine Corps Systems Command improperly used both Procurement, Marine Corps and Operation and Maintenance, Marine Corps appropriation to pay for the construction of this facility. Remedial Action Taken: To prevent a recurrence of this type of violation, the Navy reported that the Marine Corps Systems Command issued “Construction Acquisition Guidelines” on January 27, 2016, which established procedures and internal controls to govern future construction and construction related efforts. The Navy identified the Assistant Program Manager and the lead Contracting Officer as being responsible for the ADA violation. The Contracting Officer received a formal letter of reprimand. The Assistant Program Manager was no longer a U.S. government employee when the violation was identified and so discipline was not pursued. The Navy determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 2 B-331343 === page 3 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-02 Agency No.: None Reported Date Reported to GAO: October 29, 2018 Agency: Department of the Treasury (Treasury) Date(s) of Violation(s): Fiscal Year (FY) 2015 Account(s): Salaries and Expenses, Departmental Offices Amount Reported: $35,996,536 Description: Treasury reported two separate violations of the Antideficiency Act (ADA) when it expended an amount more than was available in the Salaries and Expenses, Departmental Offices account. The first violation occurred in July 2015 in the amount of $9,906,155. The second violation occurred in August 2015 in the amount of $26,090,381. Treasury stated that these two violations occurred due to delays in collecting payments from other federal entities under reimbursable agreements, and that the following circumstances contributed to the violations: (1) its fund control systems did not verify fund balances before an expenditure liquidating a valid obligation was approved; (2) its longstanding systems and practices did not include real-time monitoring of fund balances; and (3) in FY 2015, Congress enacted a new Salaries and Expenses, Office of Terrorism and Financial Intelligence account, which had previously been part of the Salaries and Expenses, Departmental Offices account, and the creation of the new account reduced the cash balance in the latter account during that fiscal year. Remedial Action Taken: To prevent a recurrence of these types of violations, Treasury reported that it developed standardized processes and procedures, implemented signature workflows, and created a centralized filing system. Treasury reported that it also automated the generation of agreements and documents to enhance standardization and effectiveness of internal controls. Lastly, Treasury reported that dedicated personnel now monitor inter-governmental invoices to ensure timely posting of collections, and monitor the fund balance with Treasury to ensure the account carries a positive cash balance at the end of each month. Treasury did not report whether any disciplinary action was taken against any employees, but did report that it determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 3 B-331343 === page 4 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-03 Agency No.: None Reported Date Reported to GAO: November 8, 2018 Agency: Office of the Federal Coordinator for Alaska Natural Gas Transportation Projects (OFC) Date(s) of Violation(s): Fiscal Year (FY) 2015 Account(s): Office of the Federal Coordinator for Alaska Natural Gas Transportation Projects Amount Reported: $210,000 Description: On November 8, 2018, the Office of Management and Budget (OMB) transmitted a letter from OFC dated March 6, 2015, reporting a violation of the Antideficiency Act (ADA) when OFC obligated funds in advance of an apportionment. OFC reported that it obligated $210,000 in FY 2015 without an apportionment. OFC reported that it relied on the General Services Administration (GSA) to perform its accounting. GSA erroneously informed OFC that upon enactment of the FY 2015 Continuing Resolution (Public Law 113-164, as amended), it had been automatically apportioned funds under OMB Bulletin No. 14-03. Only after obligation, GSA notified OFC that the automatic apportionment provided by OMB under the FY 2015 Continuing Resolution did not apply to an account if either the House or Senate had reported or passed a bill that provided no funding for that account at the time the Continuing Resolution was enacted or extended. The House of Representatives had passed a 2015 Energy and Water Appropriations bill on July 10, 2014 that did not include any funding for OFC. GSA notified OFC of GSA’s error on January 23, 2015. Remedial Action Taken: OMB reported that OFC de-obligated funds to the maximum extent possible after it was notified of the error, and moved $83,000 of the obligations that were improperly recorded to other accounts that OFC said were available for the same purposes. OMB apportioned the remaining $127,000 balance and obtained a warrant from the Department of Treasury to cover these obligations. OFC determined that the ADA violations were not willfully or knowingly committed. Note: In its March 6, 2015 letter, OFC noted that it would be “shut down” as of March 7, 2015. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 4 B-331343 === page 5 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-04 Agency No.: DLA, 17-01 Date Reported to GAO: November 26, 2018 Agency: Defense Logistics Agency (DLA) Date(s) of Violation(s): Fiscal Years (FYs) 2015-2017 Account(s): Operation and Maintenance, Amount Reported: $229,444 Navy Description: DLA, through the Department of Defense (DOD), reported violations of the Antideficiency Act (ADA) that occurred when it purchased boots under a contract that did not comply with the Berry Amendment, 10 U.S.C. §§ 2533a. The Berry Amendment prohibits the procurement of certain items if they are not grown, reprocessed, reused, or produced in the United States. DLA awarded a multiyear contract in FY 2015 to procure boots for the Navy. A DOD Inspector General report determined that the contract did not comply with the Berry Amendment because components of the boots being purchased were not produced in the United States, and no valid exceptions to the Berry Amendment applied. Remedial Action Taken: To prevent a recurrence of this type of violation, DLA reported that it performs reviews of contracts awarded by DLA Land & Maritime detachments at each of the shipyards every two years. Additionally, DLA reported that all DLA acquisition personnel are required to complete Buy American Statute and Berry Amendment courses offered by the Defense Acquisition University. The DLA headquarters management review team also visits all major subordinate commands to perform reviews to validate ongoing self-assessments reported by the major subordinate commands to detect Berry Amendment non-compliance issues. DLA identified one Contracting Officer as being responsible for the ADA violations. The individual left DLA and joined the U.S. Army Corps of Engineers (USACE) prior to completion of the ADA investigation. A copy of the ADA report was submitted to USACE for consideration. USACE determined that Berry Amendment training for the contracting officer was sufficient and no additional disciplinary action was taken. DLA determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 5 B-331343 === page 6 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-05 Agency No.: None Reported Agency: Department of Justice (Justice) Date Reported to GAO: December 13, 2018 Date(s) of Violation(s): Fiscal Years (FYs) 2005-2016 Account(s): Salaries and Expenses, Amount Reported: Justice was Unable to Bureau of Alcohol, Tobacco, Firearms and Calculate the Amount Explosives (ATF) Description: Justice reported that it violated the Antideficiency Act (ADA) when it improperly used funds to open and close foreign ATF offices without providing advance notice to Congress, as required by its annual appropriations acts. Justice’s annual appropriations acts prohibit it from spending funds to relocate or close an office, including those offices located in foreign countries, until it provides 45-days advance notice to the House and Senate Committees on Appropriations. Justice reported that it opened six, and closed two, foreign offices between FY 2005 through FY 2016 without first notifying Congress. Justice was not able to calculate the costs of the ADA violations that were associated with opening and closing the foreign offices for various reasons. For example, many of the expenses involved, such as salaries and foreign duty pay differentials, would have been incurred regardless of whether Justice had a temporary presence in the foreign location or a permanent office. Remedial Action Taken: To prevent a recurrence of this type of violation, Justice reported that ATF published and circulated a standard operating procedure (SOP) for notifying Congress on office relocations. The SOP also provides staff with guidance for how to obtain internal authorizations and notification templates. Additionally, Justice reported that it has revised its internal policies for obtaining approvals in these types of situations. Justice identified its Office of Management and its International Affairs Division as being responsible for the ADA violations but noted that the violations spanned over 10 years, and involved a variety of individuals, some of whom likely are no longer still employed at ATF or in the same positions. Justice determined that the ADA violations were not willfully or knowingly committed, and reported that no disciplinary action was taken against any individuals. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 6 B-331343 === page 7 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-06 Agency No.: None reported Date Reported to GAO: April12, 2019 Agency: Department of Homeland Security (DHS) Date(s) of Violation(s): Fiscal Year (FY) 2012 Account(s): Analysis and Operations Amount Reported: $4,811,827 Description: DHS reported that it violated the Antideficiency Act (ADA) during FY 2012 when its Office of Intelligence and Analysis (I&A) made obligations in excess of its apportionment. The ADA violation occurred when I&A used the incorrect apportionment methodology to calculate the amount of its funding while operating under an automatic apportionment of funds appropriated by the Consolidated Appropriations Act, 2012. This error led to I&A obligating funds in excess of its apportionment on December 30, 2011. Remedial Action Taken: To prevent a recurrence of this type of violation, DHS reported that the Department no longer allows its components to calculate their automatic apportionment amounts. Rather, the DHS Office of the Chief Financial Officer now provides allocations to component DHS offices. DHS identified a Supervisory Budget Analyst as being responsible for the violation. DHS determined that the ADA violations were not willfully or knowingly committed, and reported that no disciplinary action was taken against the employee involved. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 7 B-331343 === page 8 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-07 Agency No.: Air Force, 16-02 Date Reported to GAO: April 19, 2019 Agency: Department of the Air Force (Air Date(s) of Violation(s): Fiscal Year 2010 Force) Account(s): Operation and Maintenance, Amount Reported: $2,729,870 Air Force Description: The Air Force, through the Department of Defense, reported that it violated the Antideficiency Act (ADA) when it improperly used Air Force’s Operation and Maintenance (O&M) funds to procure movable containers that were incorporated into a construction project at Vogelweh Air Base in Germany. The construction project was for work to convert a building at Vogelweh Air Base into a U.S. Air Force band facility. The Air Force reported that it initially characterized the removable containers as personal property and used O&M funds to procure them. However, the removable containers should have been characterized as a part of the overall cost of construction because they were installed as an integral part of the converted building. The Air Force reported that due to the overall cost of the effort, it should have been categorized as major military construction (MILCON). Accordingly, all aspects of the construction project, inclusive of the movable containers, should have been paid for exclusively with specific MILCON funds, but there were no MILCON funds available for this purpose. Remedial Action Taken: To prevent a recurrence of this type of violation, the Air Force reported that it changed the processes for construction projects to utilize an overlapping team approach. The Air Force reported that it is also providing fiscal law training to a greater audience than just financial management personnel, with an emphasis on appropriation types and threshold limitations. The Air Force identified the former 86 Civil Engineer Squadron (CES) Deputy Commander, the former 86 CES Chief of Design, and the former Engineering Flight Chief as being responsible for the ADA violations. All three individuals received an oral admonishment and counseling from their supervisor. The Air Force determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 8 B-331343 === page 9 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-08 Agency No.: Navy 17-01 Date Reported to GAO: May 06, 2019 Agency: Department of the Navy (Navy) Date(s) of Violation(s): Fiscal Years (FYs) 2013-2015 Account(s): Operation and Maintenance, Amount Reported: $1,070,677 Navy Description: The Navy, through the Department of Defense, reported violations of the Antideficiency Act (ADA) that occurred when the Naval Supply Systems Command (NAVSUP) Fleet Logistics Center awarded a contract that did not comply with the Berry Amendment, 10 U.S.C. §§ 2533a. The Berry Amendment prohibits the procurement of certain items if they are not grown, reprocessed, reused, or produced in the United States. NAVSUP awarded a contract that required the contractor to operate a retail store to sell various supplies, such as clothing, textiles, and hand or measuring tools, to Navy commands and organizations. A Department of Defense Inspector General investigation determined that a significant number of items purchased by the contractor for resale to customers did not comply with the Berry Amendment. The contractor acquired the non-compliant items based on the mistaken belief that they were exempt from Berry Amendment requirements. Remedial Action Taken: To prevent a recurrence of this type of violation, the Navy referred the contractor to relevant sections of the contract to ensure the contractor understood Berry Amendment requirements. The Navy also reported that it updated the contract’s administration plan to require routine Berry Amendment compliance inspections and assessments on a monthly or as-needed basis, or both. Additionally, the Navy reported that the contractor now requires suppliers to provide evidence of Berry Amendment compliance. The Navy identified two Contracting Officers and the Deputy Director of the Contracting Department as being responsible for the ADA violations. The Chief Executive Officer of the Navy Exchange Service Command orally counseled the Deputy Director. The two Contracting Officers are no longer U.S. government employees and so discipline was not pursued. The Navy determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 9 B-331343 === page 10 === Enclosure Antideficiency Act Reports – Fiscal Year 2019 GAO No.: GAO-ADA-19-09 Agency No.: None Reported Date Reported to GAO: July 8, 2019 Agency: Department of Veterans Affairs (VA) Date(s) of Violation(s): Fiscal Years (FYs) 2013-2015 Account(s): Information Technology Systems Amount Reported: $8,000,000 Description: VA reported that its Office of Transition, Employment, and Economic Impact (OTEEI) violated the Antideficiency Act (ADA) when it used funds from its General Operating Expenses account, rather than from its Information Technology (IT) Systems account, to finance the development and maintenance of an IT dashboard. VA reported that OTEEI used funds from its General Operating Expenses account because it was not aware that the IT Systems account should have been used for funding IT development costs. VA reported that the violation was partially cured by later charging and adjusting the appropriate IT Systems accounts after the error was identified by VA’s Office of Inspector General. However, the correction resulted in violations of certain statutory restrictions and conditions that Congress had placed on VA’s use of the IT Systems Development subaccount in the appropriations acts for FY 2013, FY 2014, and FY 2015. VA reported the ADA violation because of the violation of these restrictions. Remedial Action Taken: To prevent a recurrence of this type of violation, VA reported that VA’s Office of Information and Technology revised its policy guidance both to clarify what constitutes IT and non-IT expenditures and to include definitions in accordance with VA’s appropriations act. The VA identified its former OTEEI Chief of Transition of the Veterans Benefits Administration as being responsible for the violation. VA did not report whether any disciplinary action was taken against any employees, but did report that it determined that the ADA violations were not willfully or knowingly committed. Source: Unaudited information GAO extracted from agency Antideficiency Act reports. Page 10 B-331343 === page 11 === GAO-ADA-19-01 === page 12 === [OCR text: machine-read from a scanned page; the PDF governs] The Assistant Program Manager, Live Training Systems Development Program, MCSC (retired) and the lead Contracting Officer, MCSC were found responsible for causing the ADA violation. The MCSC Commanding Officer issued the lead Contracting Officer, MCSC a formal letter of reprimand. The Assistant Program Manager, MCSC is no longer a United States Government employee and discipline was not pursued. The violation contained no willful or knowing intent on the part of the responsible individuals to violate the ADA. To prevent a recurrence of this type of violation, the MCSC issued the “Construction Acquisition Guidelines,” on January 27, 2016, which established procedures and internal controls for identification, funding, and contracting of construction and construction related efforts. The Deputy Commander, Resource Management and Assistant Commander of Contracts/Head of the Contracting Activity has required all Contracts and Financial Management Personnel to complete a Defense Acquisition University construction, Antideficiency Act, and Appropriations Law training courses. Identical reports are also being submitted to the President (through the Director of the Office of Management and Budget), President of the Senate, and Speaker of the House of Representatives. Sincerely, David L. Norquist Enclosure: As stated === page 13 === GAO-ADA-19-02 === page 14 === [OCR text: machine-read from a scanned page; the PDF governs] fund balance with Treasury to ensure the account carries a positive cash balance at the end of each month. The Department of the Treasury determined that the violation contained no willful or knowing intent to violate the Antideficiency Act. Identical reports are being submitted to the President of the Senate, the Speaker of the House, and the Comptroller General. Respectfully, Steven T. Mnuchin === page 15 === GAO-ADA-19-03 === page 16 === [OCR text: machine-read from a scanned page; the PDF governs] March 6, 2015 The Honorable Gene L. Dodaro Comptroller General of the United States General Accounting Office 441 G Street, NW Washington, D.C. 20548 Dear Comptroller Dodaro: This letter is to report a violation of the Antideficiency Act (ADA), as required by 31 ULS.C. 1517(b). A violation of section 1517(a)(1) of Title 31 occurred during fiscal year (FY) 2015 in the Office of the Federal Coordinator for Alaska Natural Gas Transportation Projects’ (OFC) account 95-15/16-2850 when $210,000 was obligated in advance of an apportionment. The OFC, which is a small independent agency with four full-time employees, contracts with the General Services Administration (GSA) to perform its accounting. GSA informed the OFC that it had been automatically apportioned funds under the FY 2015 Continuing Resolution (CR) (Public Law 113-164, as amended) in account 95-15/16-2850. This was erroneous, however, because the House of Representatives had passed a 2015 Energy and Water Appropriations bill on July 10, 2014, that did not include any funding for the OFC. Under Office of Management and Budget (OMB) Bulletin No. 14-03, the automatic apportionments provided by OMB under the CRs thus did not apply to the OFC.! Based on the guidance received from GSA as its financial service provider, the OFC made obligations in FY 2015 totaling $210,000 without an apportionment. On January 23, 2015, GSA notified the OFC of the error. At that point, the OFC de-obligated funds to the maximum extent possible in account 95-15/16-2850, in line with OMB Circular No. A-11. The OFC was also able to move $83,000 of the obligations improperly recorded against the CR to other accounts that were available for the same purposes and contained sufficient balances. OMB then apportioned the $127,000 balance in account 95-15/16-2850, and obtained a warrant from the Department of the Treasury to cover these obligations pursuant to section 105 of the CR. The OFC has found no evidence that the violation was committed willfully or knowingly by anyone involved. The OFC will be shut down as of March 7, 2015. ) OMB Bulletin No. 14-03, which was transmitted to the heads of executive departments and establishments on September 25, 2014, states, “As has been the case in recent CR Bulletins, including FY 2014, if either the House or Senate has reported or passed a bill that provides no funding for an account at the time the CR is enacted or extended, this automatic apportionment does not apply to that account.” === page 17 === GAO-ADA-19-04 === page 18 === [OCR text: machine-read from a scanned page; the PDF governs] violations contained no willful or knowing intent on the part of the responsible individual to violate the ADA. To prevent a recurrence of these types of violations, DLA’s Procurement Process Support Directorate performs reviews of contracts awarded by the DLA Land & Maritime detachments at each of the shipyards every two years. In addition, all DLA acquisition personnel, including the DLA Maritime — Puget Sound Naval Shipyard acquisition, were mandated to complete the Buy American Statute and Berry Amendment courses offered by the Defense Acquisition University. The Headquarters DLA Agency Management Review team also visits Major Subordinate Commands (MSCs) once every two years to perform “Check the Checker” reviews. These reviews validate ongoing self-assessments reported by the MSCs, and provide a level of internal controls above the MSC level to potentially detect future Berry Amendment non-compliance issues. Identical reports are also being submitted to the President (through the Director of the Office of Management and Budget), President of the Senate, and Speaker of the House of Representatives. ; Sincerely, David L. Norquist Enclosure: As stated === page 19 === GAO-ADA-19-05 === page 20 === [OCR text: machine-read from a scanned page; the PDF governs] Letter to Comptroller General Page 2 e Nassau, Bahamas: 2016 Further, the ATF closed the following two foreign offices in fiscal year 2014 without submitting CRRs to Congress: e Merida, Mexico e Vancouver, British Columbia, Canada Since ATF opened or closed the above offices without sending CRRs to the appropriate Congressional committees, the ATF violated section 505 with respect to the above offices. By failing to satisfy the preconditions in section 505 prior to obligating and expending funds to open or close these offices, ATF incurred obligations and expenditures in excess of available appropriations in violation of the ADA. 31 U.S.C. § 1341(a)(1). The foreign offices listed above were established as a result of coordinated efforts between the Justice and State Departments to facilitate criminal investigations and combat firearms trafficking and gang activity in foreign countries.” In researching these offices it was not always clear when ATF transitioned from having a permissible presence in a foreign location under the auspices of the State Department to establishing a new office of the Department. The Department considered several indicia to be relevant to our determination that ATF opened new offices, such as the reassignment of employees to permanent duty stations at those offices (with ensuing relocation payments), and the inclusion of the offices on ATF’s website. While the above indicia led the Department to conclude that ATF had opened permanent offices without providing the required Congressional notice, and that therefore ADA violations had occurred, the nature of these violations (as well as the fact that some occurred many years ago) made it impractical for ATF to determine with any degree of accuracy the amount of funds spent with respect to each violation. This is in large part due to the fact that many of the expenses incurred with respect to these offices, such as salaries and foreign duty pay differentials, would have been incurred regardless of whether the Department had a temporary presence or a permanent office. Further, while there were costs of establishing the permanent presence, those costs were offset by other savings. For example, when ATF permanently relocated employees to these offices, it stopped paying temporary duty travel expenses. Accordingly, ATF has not quantified the dollar amount associated with these ADA violations. The Department found that ATF’s Office of Management and its International Affairs Division were responsible for the ADA violations.? The ADA violations occurred because of a 2 While we recognize that the Department did not submit formal CRRs with respect to these offices, we note that the Department’s involvement in these regions was often described in our Congressional budget submissions and other disclosures to Congress. There was never an intention by the Department, or ATF, to conceal these offices; merely a lack of understanding of the CRR process. 3 The fact that these violations spanned over 10 years, and involved a variety of individuals, would require extensive investigation to definitively name individuals responsible for each violation, some of whom likely are no longer still employed at ATF or in the same positions. The individuals currently responsible for these types of office openings and closings discovered the ADA violations themselves and followed Departmental policy to elevate the matter, and thus are aware of the issue and understand the importance of the Congressional notification process. === page 21 === [OCR text: machine-read from a scanned page; the PDF governs] Letter to Comptroller General Page 3 misunderstanding within ATF regarding the need to satisfy the CRR requirements in addition to the processes required for Justice and State Department approvals (pursuant to National Security Decision Directive (NSDD) 38). The violations were facilitated by a lack of ATF internal controls regarding these parallel processes (now addressed by new ATF procedures, noted below), and led ATF to open and close the foreign offices without ensuring that all legally required preconditions for the obligation and expenditure of funds had been met. No willful or knowing intent was found with respect to the ADA violations, and the Department has not disciplined any of the individuals involved, focusing instead on improving ATF internal controls. The Department has instituted a number of corrective actions to preclude future incidents. In 2017, ATF published and circulated a 14-page Standard Operating Procedure (SOP) for the CRR process. The SOP contains a detailed explanation of the CRR and NSDD-38 authorization requirements, a step-by-step guide for obtaining internal ATF authorization, and templates for both CRR and NSDD-38 requests. In addition, the Department has revised its policy regarding NSDD-38 requests, and now requires the completion of the CRR notification process prior to NSDD-38 approval. Finally, the Department notes that since fiscal year 2005 it has received unmodified (clean) audit opinions on its financial statements. Identical reports are being submitted to the President, President of the Senate, the Speaker of the House of Representatives, and the Director of Office of Management and Budget. Respectfully, ~~ Lee J. Lofthus Assistant Attorney General for Administration, and Chief Financial Officer === page 22 === GAO-ADA-19-06 === page 23 === [OCR text: machine-read from a scanned page; the PDF governs] The Honorable Gene L. Dodaro Page 2 I&A applied the pro-rata share of the current year’s enacted appropriation level on December 30, 2011. I&A then allocated and obligated 30 days of its appropriation ahead of guidance from the DHS Office of the Chief Financial Officers’ Budget Division provided on January 4, 2012. This guidance determined that the seasonal rate resulted in the lowest apportionment amount, and should have instead been used by I&A because the seasonal rate yielded an apportionment amount of $4,811,827 less than the apportionment rate actually applied by I&A. The Department has taken corrective action to prevent future violations by improving its policies and procedures. Specifically, the Department no longer allows Components to calculate their automatic apportionment amounts. Rather, the DHS Office of the Chief Financial Officer now provides the allocations to the Components. This measure helps to ensure that a violation of this type does not occur again. Due to the nature of this violation, no disciplinary action against the employee involved in this matter was taken. The Department has determined that the responsible party had no knowing and willful intent to violate the ADA. An identical copy of this letter is being sent to the President, the President of the Senate, and the Speaker of the House of Representatives. A similar letter is also being provided to the Director of OMB. Sincerely, === page 24 === GAO-ADA-19-07 === page 25 === [OCR text: machine-read from a scanned page; the PDF governs] project. As this military construction project exceeded the O&M threshold of $750,000 for unspecified minor military construction, and the O&M funds used to fund the construction were not available for obligation (10 U.S.C. § 2805), the Purpose Statute (31 U.S.C. § 1301) was violated. As no MILCON funds were available to pay for it, an ADA violation was committed (31 U.S.C. §1341). The former 86 Civil Engineer Squadron (CES) Deputy Commander, the former 86 CES Chief of Design, and the former Engineering Flight Chief were found responsible for causing the ADA violation. All three named responsible individuals received an oral admonishment/verbal counseling from their current supervisor. The violation contained no willful or knowing intent on the part of the responsible individuals to violate the ADA. To prevent a recurrence of this type of violation, the USAFE changed the processes for construction projects to utilize an overlapping, team approach, bringing together programmers, designers, and engineers from inception to completion. The USAFE is conducting fiscal law training to a greater audience than just financial management personnel, with an emphasis on appropriation types and threshold limitations, to provide a greater understanding of the legal implication of programming actions with regard to projects and different types of equipment. Identical reports are also being submitted to the President (through the Director of the Office of Management and Budget), President of the Senate, and Speaker of the House of Representatives. Sincerely, El oin me Cu» by Elaine McCusker Deputy Under Secretary of Defense (Comptroller) Enclosure: As stated === page 26 === GAO-ADA-19-08 === page 27 === [OCR text: machine-read from a scanned page; the PDF governs] Two contracting officers and the Deputy Director, Contracting Department, were found responsible for causing the ADA violations. The Chief Executive Officer, Navy Exchange Service Command, orally counseled the Deputy Director. The two contracting officers are no longer U.S. Government employees and discipline was not pursued. The violations contained no willful or knowing intent on the part of the responsible individuals to violate the ADA. To prevent a recurrence of this type of violation, the contracting officer referred the contractor to the applicable sections of the contract relevant to the Berry Amendment and ensured its understanding of the requirements. The contracting officer updated the contract administration plan to include routine assessments of stocked items. Since April 2015, the contracting officer’s representative has conducted one wall-to-wall inspection and additional assessments on a monthly and/or as-needed basis to check for Berry Amendment compliance. In addition, the contractor now requires that its suppliers provide definitive evidence of compliance with the Berry Amendment. Identical reports are also being submitted to the President (through the Director of the Office of Management and Budget), President of the Senate, and Speaker of the House of Representatives. Sincerely, Cluns Pty Elaine McCusker Deputy Under Secretary of Defense (Comptroller) Enclosure: As stated === page 28 === GAO-ADA-19-09 === page 29 === [OCR text: machine-read from a scanned page; the PDF governs] Page 2. The Honorable Gene L. Dodaro defined projects); and that the Development subaccount must be used for projects and in the amounts, specified in the explanatory statement that accompanied the appropriations act. None of these conditions were met with respect to the dashboard project. As a result of violating these appropriations act restrictions on the use of IT Systems account appropriations, VA violated the Antideficiency Act. In its May 2, 2018, report titled “Review of Alleged Contracting and Appropriation Irregularities at the Office of Transition, Employment, and Economic Impact” (Project #2016-04555-R6-0192), the VA Office of Inspector General (OIG) found that OTEE| committed a Purpose Statute violation and may have violated the Antideficiency Act and recommended that the Executive in Charge for Benefits ensure the OTEEI Director consult with the Head of Contracting Activity and the Office of General Counsel to determine what actions need to be taken to remedy the unauthorized commitment, and that the Executive in Charge for Benefits obtain appropriate funding for all future IT costs. In addition, the OIG report recommended that the Executive in Charge for Benefits coordinate with the Office of Information and Technology (OIT), the Office of Management, and the Office of General Counsel to make accounting adjustments to debit the IT account that should have been used and credit the GOE account that was inappropriately used, determine whether Antideficiency Act violations occurred, and report the violations, as appropriate. OIT recently issued revised policy guidance to clarify what constitutes IT and non-IT expenditures and to account for new technologies, to include definitions in accordance with VA’s appropriations act for staff to use when obligating funds. It will be used by VA finance and contracting staff as obligations are incurred. VA believes that with clearer policy guidance, similar violations can be avoided. VA has determined that the responsible party had no knowing nor willful intent to violate the Antideficiency Act. Identical reports are being submitted to the President, the President of the Senate, and the Speaker of the House of Representatives. Sincerely, CELPL, bei tle ce Robert L. Wilkie