=== page 1 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget April 2026 OPERATION AND MAINTENANCE, SPACE FORCE Volume I === page 2 === This Page Intentionally Left Blank. i === page 3 === TABLE OF CONTENTS Section I SAG 12A SAG 13A SAG 13C SAG 13D SAG 13E SAG 13F SAG 13M SAG 13R SAG 13W SAG 13Z SAG 41A SAG 42A PBA-19 Introductory Statement (Appropriation Highlights) ............................................................................................................................................ 1 O-1A O&M Funding by Budget Activity/Activity Group/Subactivity Group ..................................................................................................................... 6 O-1 NGRMS ................................................................................................................................................................................................................... 8 OP-32A Appropriation Summary of Price/Program Growth ......................................................................................................................................... 11 PB-31D Summary of Funding Increases and Decreases ............................................................................................................................................ 14 PB-31R Personnel Summary ....................................................................................................................................................................................... 19 OP-8 Civilian Personnel Costs ..................................................................................................................................................................................... 21 OP-8 Part 2 Reimbursable Civilian Personnel Costs, Part 2 ....................................................................................................................................... 27 Global C3I & Early Warning.......................................................................................................................................................................................... 30 Space Launch Operations ............................................................................................................................................................................................ 46 Space Operations ......................................................................................................................................................................................................... 59 Cyberspace Activities ................................................................................................................................................................................................... 77 Education and Training ................................................................................................................................................................................................. 89 Special Programs ....................................................................................................................................................................................................... 104 Depot Maintenance .................................................................................................................................................................................................... 120 Maintenance of Real Property .................................................................................................................................................................................... 131 CLS & Systems Support ............................................................................................................................................................................................. 144 Base Support .............................................................................................................................................................................................................. 160 Logistics Operations ................................................................................................................................................................................................... 173 Administration ............................................................................................................................................................................................................. 182 ii === page 4 === This Page Intentionally Left Blank. === page 5 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force ($ in Millions) Appropriations Summary Operations and Maintenance, Space Force Total FY 2025 Actuals Price Change Program Change FY 2026 Enacted Price Change Program Change FY 2027 Request 5,050.8 5,050.8 128.9 128.9 499.9 499.9 5,679.6 5,679.6 109.5 109.5 3,476.8 3,476.8 9,265.9 9,265.9 Description of Operations Financed: The FY 2027 Operation and Maintenance (O&M) appropriation funds the day-to-day expenses to operate, sustain, and maintain spacelift operations, Department of War satellites, and many of the U.S. Space Force’s ground-based and space-based systems; to organize, train, and equip Space Guardians; to provide pay and benefits for civilian personnel; and to purchase day-to-day supplies and equipment. O&M resources support essential combat enablers such as intelligence, weather, and civilian pay. The FY 2027 budget implements War Department guidance to power the U.S. Space Force mission in support of the National Defense Strategy (NDS). Narrative Explanation of Changes: The U.S. Space Force is focused on implementing the NDS priority lines of effort to Defend the Homeland, Deter China in the Indo-Pacific, Increase Burden Sharing with U.S. Allies and Partners, and Supercharge the U.S. Defense Industrial base, as well as the Secretary of War's message of Reestablishing Deterrence, Rebuilding Our Military, and Reviving the Warrior Ethos. Space Force capabilities are inextricable from providing for the Nation’s defense, and the service continues to lead the joint team by developing and deploying critical capabilities in support of defense priorities. The mission of the U.S. Space Force is to organize, train, and equip Guardians to conduct global space operations that enhance the way our joint and coalition forces fight, while also offering decision makers military options to achieve national objectives. America needs a Space Force capable of deterring conflict, and if deterrence fails, prevailing in conflict that initiates in, or extends to, space. The Space Force O&M budget request totals $9,680,231,000 to include $9.3 billion in discretionary and $.4 billion in mandatory funding and represents a price increase of $.1 billion and a program growth of $3.5 billion. The growth in FY 2027 updates vital infrastructure to support the mission, enhances warfighting skills for our Guardians, and provides space support to the Combatant Commands. The budget request postures the U.S. Space Force to further establish, maintain, and preserve the United States' freedom in the space domain. The resources requested allow the U.S. Space Force to build an exceptional force with next-generation space warfighting capabilities. 1 Exhibit PBA-19 Introductory Statement (Appropriation Highlights) === page 6 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force ($ in Thousands) Table 1: Funding Overview FY 2025 Discretionary $ Mandatory $ Total $ FY 2026 5,051,213 5,051,213 FY 2027 $ 5,679,648 $ 9,265,917 $ 42,185 $ 414,314 $ 5,721,833 $ 9,680,231 Table 2: Detailed Mandatory Breakout BLI FY 2025 Reconciliation Bin Title FY 2027 FY 2026 012A INDOPACOM $ - $ 795 013F INDOPACOM $ - $ 6,390 013R Quality of Life $ - $ 20,000 013R Warrior Ethos $ - $ 013Z INDOPACOM $ - $ 15,000 $ - $ 42,185 Mandatory Total - $ 414,314 $ 414,314 The FY 2027 request for O&M, Space Force, includes $9,265,917 thousand of discretionary and $414,314 thousand of mandatory for a total of $9,680,231 thousand. The FY 2027 mandatory funds of $414,314 thousand are for Real Property Maintenance (13R) to continue efforts from FY2026 of critical investment in foundational readiness and long-term viability of the U.S. Space Force. This funding directly addresses maintenance and repair requirements in support of mission assurance, combat readiness, and the quality of life for Guardians. The FY 2026 spend plan amount for O&M, Air Force, includes $5,679,648 thousand of discretionary and $42,185 thousand of mandatory (reconciliation) for a total of $5,721,833 thousand. 2 Exhibit PBA-19 Introductory Statement (Appropriation Highlights) === page 7 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Readiness Funding Operations and Maintenance, Space Force $ in Millions FY 2025 Actuals 2,320.4 Price Change 39.8 Program Change 59.5 FY 2026 Enacted 3,419.6 Price Change 46.7 Program Change 980.9 FY 2027 Request 3,447.1 Description of Strategic Readiness Financed: The primary focus of U.S. Space Force readiness funding is focused on meeting the demands of the current and future competitive strategic environment. Core readiness includes Space Operations capabilities and Weapon System Sustainment which provides resilient architecture and effects that increase Joint Force lethality and effectiveness while also protecting the Joint Force from space-enabled attack. Readiness enabler funding ensures offensive and defensive Cyberspace Activities and Global Command, Control, Communication, Intelligence (C3I) & Early Warning as well as agile and resilient Launch Operations. 3 Exhibit PBA-19 Introductory Statement (Appropriation Highlights) === page 8 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force ($ in Millions) Budget Activity Operating Forces (BA-01) FY 2025 Actuals Price Change Program Change FY 2026 Enacted Price Change Program Change FY 2027 Request 4,862.3 121.4 491.1 5,474.9 106.5 3,198.4 8,779.9 Budget Activity 01 includes operational U.S. Space Force functions. These consist of space launch capabilities to send payloads into various orbits, continual maintenance for communication equipment for space-based platforms, ballistic missile early warning radar systems, and management readiness and sustainment of Department of the Air Force weather systems with space environmental capabilities. Budget Activity 01: Operating Forces - Major Program Changes: The FY 2027 Operating Forces budget request of $8,780 Billion represents a price increase of $107 million and program growth of $3,198 million. Detailed changes by Subactivity Group are provided in the OP-5 Exhibits of this Justification Book. 4 Exhibit PBA-19 Introductory Statement (Appropriation Highlights) === page 9 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force ($ in Millions) Budget Activity Administration & Servicewide Activities (BA-04) FY 2025 Actuals Price Change Program Change FY 2026 Enacted Price Change Program Change FY 2027 Request 188.5 7.5 8.8 204.8 3.0 278.3 486.0 Budget Activity 04 funds a broad mission area integral to Space Force readiness, effective leadership, efficient management, and adequate support to units and personnel. The Administration Subactivity Group provides personnel support functions and fulfills a broad range of essential needs to sustain mission capability, quality of life, and workforce productivity. Finally, this Subactivity supports planning, policy, strategy, international relations, space interagency relations, and space activities across the Department of the Air Force space enterprise. Budget Activity 04: Administration and Servicewide Activities - Major Program Changes: The FY 2027 Administration and Service-wide Activities budget request of $486 million represents a price increase of $3 million and program growth of $278 million. Detailed changes by Subactivity Group are provided in the OP-5 Exhibits of this Justification Book. 5 Exhibit PBA-19 Introductory Statement (Appropriation Highlights) === page 10 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force O&M FUNDING BY BUDGET ACTIVITY/ACTIVITY GROUP/SUBACTIVITY GROUP ($ In Thousands) Total Obligational Authority (Dollars in Thousands) FY 2025 FY 2026 FY 2027 Combat Related Operations 3410f 12A Global C3I & Early Warning 611,816 611,816 788,686 788,686 1,056,824 1,056,824 Space Operations 3410f 13A Space Launch Operations 3410f 13C Space Operations 3410f 13D Cyberspace Activities 3410f 13E Education and Training 3410f 13F Special Programs 3410f 13M Depot Maintenance 3410f 13R Maintenance of Real Property 3410f 13W CLS & Systems Support 3410f 13Z Base Support 4,250,521 356,741 915,123 123,030 217,046 465,316 68,192 529,024 1,337,074 238,975 4,686,204 395,571 872,247 135,512 286,225 666,361 67,126 550,682 1,480,242 232,238 7,723,047 415,322 1,266,939 289,958 783,168 852,239 83,803 1,384,326 2,096,381 550,911 4,862,337 5,474,890 8,779,871 Logistics Operations 3410f 41A Logistics Operations 29,389 29,389 35,889 35,889 36,164 36,164 Servicewide Activities 3410f 42A Administration 159,080 159,080 168,869 168,869 449,882 449,882 188,469 204,758 486,046 Budget Activity 01: Operating Forces TOTAL BA 01: Operating Forces Budget Activity 04: Administration and Servicewide Activities TOTAL BA 04: Administration and Servicewide Activities 6 Exhibit O-1A O&M Funding by Budget Activity/Activity Group/Subactivity Group === page 11 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force O&M FUNDING BY BUDGET ACTIVITY/ACTIVITY GROUP/SUBACTIVITY GROUP ($ In Thousands) Total Obligational Authority (Dollars in Thousands) FY 2025 FY 2026 5,050,806 5,679,648 Total Operation and Maintenance, Space Force 7 FY 2027 9,265,917 Exhibit O-1A O&M Funding by Budget Activity/Activity Group/Subactivity Group === page 12 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force O&M FUNDING BY BUDGET ACTIVITY/ACTIVITY GROUP/SUBACTIVITY GROUP ($ In Thousands) 8 Exhibit O-1 NGRMS O&M Funding by Budget Activity/Activity Group/Subactivity Group === page 13 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force O&M FUNDING BY BUDGET ACTIVITY/ACTIVITY GROUP/SUBACTIVITY GROUP ($ In Thousands) 9 Exhibit O-1 NGRMS O&M Funding by Budget Activity/Activity Group/Subactivity Group === page 14 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force O&M FUNDING BY BUDGET ACTIVITY/ACTIVITY GROUP/SUBACTIVITY GROUP ($ In Thousands) 10 Exhibit O-1 NGRMS O&M Funding by Budget Activity/Activity Group/Subactivity Group === page 15 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Appropriation Summary of Price/Program Growth ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 485,798 0 1.28% 6,218 44,361 536,377 0 0.28% 1,502 275,460 813,339 8,437 0 1.28% 108 -8,545 0 0 0.28% 0 0 0 0 0 2.90% 0 643 643 0 2.10% 14 -1 656 2.90% 2.10% CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 103 WAGE BOARD 110 UNEMPLOYMENT COMPENSATION 121 PCS BENEFITS 1,576 0 495,811 0 TRAVEL OF PERSONS 63,473 -1 TOTAL TRAVEL 63,473 -1 TOTAL CIVILIAN PERSONNEL COMPENSATION 46 -1,622 0 0 6,372 34,837 537,020 0 1,587 -4,073 60,986 -1 1,587 -4,073 60,986 -1 0 0 0 1,515 275,460 813,995 1,281 61,471 123,737 1,281 61,471 123,737 28,916 TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 DLA ENERGY (FUEL PRODUCTS) 32,427 0 1.10% 357 -3,594 29,190 0 -7.08% -2,067 1,793 414 AIR FORCE CONSOLIDATED SUSTAINMENT AG (SUPPLY) 9,178 0 5.78% 530 2,201 11,909 0 4.54% 541 -202 12,248 418 AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 9,001 0 5.79% 521 3,235 12,757 0 0.61% 78 1,585 14,420 TOTAL DWCF SUPPLIES AND MATERIALS 50,606 0 1,408 1,842 53,856 0 -1,448 3,176 55,584 AIR FORCE FUND EQUIPMENT 1,362 0 34 -1,379 17 0 0 0 17 TOTAL DWCF EQUIPMENT PURCHASES 1,362 0 34 -1,379 17 0 0 0 17 86 0 0.02% 0 17 103 0 3.30% 3 -14 92 DWCF EQUIPMENT PURCHASES 505 2.50% 2.10% OTHER FUND PURCHASES 633 DLA DOCUMENT SERVICES 647 DISA ENTERPRISE COMPUTING CENTERS 22 0 2.00% 0 -22 0 0 -4.00% 0 0 0 661 AIR FORCE CONSOLIDATED SUSTAINMENT ACTIVITY GROUP (MAINT) 37,494 0 6.59% 2,471 793 40,758 0 -1.70% -693 19,092 59,157 671 DISN INFRASTRUCTURE SERVICES (DISN-IS) 4,071 0 -8.00% -326 6,725 10,470 0 0.00% 0 292 10,762 672 PRMRF PURCHASES 2,383 0 -6.46% -154 -1,232 997 0 2.30% 23 -15 1,005 TOTAL OTHER FUND PURCHASES 44,056 0 1,992 6,280 52,328 0 -667 19,355 71,016 11 Exhibit OP-32A Appropriation Summary of Price/Program Growth === page 16 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Appropriation Summary of Price/Program Growth ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program TRANSPORTATION 703 JCS EXERCISES 22,214 0 17.50% 3,887 -26,101 0 0 -19.64% 0 0 0 705 AMC CHANNEL CARGO 3,272 0 74.80% 2,447 -5,719 0 0 -1.99% 0 3,577 3,577 706 AMC CHANNEL PASSENGER 708 MSC CHARTERED CARGO 719 771 0 0 86.40% 0 0 0 0 -47.20% 0 0 0 6,773 0 2.50% 169 -4,996 1,946 0 2.10% 41 350 2,337 SDDC CARGO OPERATION (PORT HANDLING) 6,585 0 26.00% 1,712 -8,297 0 0 -60.78% 0 0 0 COMMERCIAL TRANSPORTATION 10,440 1 2.50% 261 26,869 37,571 3 2.10% 789 18 38,381 TOTAL TRANSPORTATION 49,284 1 8,477 -18,245 39,517 3 830 3,945 44,295 OTHER PURCHASES 913 PURCHASED UTILITIES (NON-FUND) 88,140 3 2.50% 2,204 20,895 111,242 2 2.10% 2,336 782 114,362 914 PURCHASED COMMUNICATIONS (NON-FUND) 95,309 0 2.50% 2,383 -11,715 85,977 -2 2.10% 1,805 308,652 396,432 915 RENTS (NON-GSA) 4,336 0 2.50% 108 31,752 36,196 0 2.10% 760 31,409 68,365 917 POSTAL SERVICES (U.S.P.S) 0 0 2.50% 0 315 315 0 2.10% 7 -4 318 920 SUPPLIES & MATERIALS (NON-FUND) 80,854 -5 2.50% 2,021 -24,831 58,039 68 2.10% 1,220 47,454 106,781 921 PRINTING & REPRODUCTION 13,050 0 2.50% 326 -12,568 808 0 2.10% 17 -5 820 922 EQUIPMENT MAINTENANCE BY CONTRACT 411,656 159 2.50% 10,295 -16,777 405,333 343 2.10% 8,519 57,197 471,392 923 OPERATION AND MAINTENANCE OF FACILITIES 188,407 -61 2.50% 4,709 -94,680 98,375 819 2.10% 2,083 15,205 116,482 925 EQUIPMENT PURCHASES (NON-FUND) 358,960 0 2.50% 8,974 63,748 431,682 5 2.10% 9,065 172,623 613,375 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 1,020,299 39 2.50% 25,508 572,739 1,618,585 432 2.10% 33,999 896,892 2,549,908 930 OTHER DEPOT MAINTENANCE (NON-FUND) 1,036,119 0 2.50% 25,903 82,270 1,144,292 0 2.10% 24,030 540,389 1,708,711 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 231,616 0 2.50% 5,790 -153,110 84,296 0 2.10% 1,770 48,466 134,532 933 STUDIES, ANALYSIS, & EVALUATIONS 42,573 0 2.50% 1,064 -25,659 17,978 0 2.10% 378 -2,765 15,591 934 154,218 0 2.50% 3,855 -102,167 55,906 0 2.10% 1,174 1,814 58,894 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 39,610 0 2.50% 990 21,613 62,213 0 2.10% 1,306 3,438 66,957 937 LOCALLY PURCHASED FUEL (NON-FUND) 0 0 1.10% 0 37 37 0 -7.08% -3 6 40 955 MEDICAL CARE 3,510 -2 4.00% 140 -2,842 806 32 3.90% 33 -42 829 957 LAND AND STRUCTURES 473,819 193 2.50% 11,850 80,779 566,641 2,478 2.10% 11,951 861,281 1,442,351 959 INSURANCE CLAIMS AND INDEMNITIES 4,075 0 2.50% 102 -4,177 0 0 2.10% 0 0 0 12 Exhibit OP-32A Appropriation Summary of Price/Program Growth === page 17 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Appropriation Summary of Price/Program Growth ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 960 INTEREST AND DIVIDENDS 40 0 2.50% 1 -41 0 0 2.10% 0 0 0 964 SUBSISTENCE AND SUPPORT OF PERSONS 0 0 2.50% 0 872 872 0 2.10% 18 19 909 985 RESEARCH AND DEVELOPMENT CONTRACTS 11,859 0 2.50% 296 -12,155 0 0 2.10% 0 103,270 103,270 987 OTHER INTRA-GOVERNMENT PURCHASES 41,362 0 2.50% 1,034 -41,120 1,276 2 2.10% 27 -4 1,301 988 GRANTS, SUBSIDIES AND CONTRIBUTIONS 730 0 2.50% 18 -748 0 0 2.10% 0 0 0 989 OTHER SERVICES 45,672 -1 2.50% 1,142 108,242 155,055 41 2.10% 3,257 27,300 185,653 TOTAL OTHER PURCHASES 4,346,214 325 108,716 480,669 4,935,924 4,220 103,755 3,113,374 8,157,273 GRAND TOTAL 5,050,806 325 128,586 499,931 5,679,648 4,222 105,266 3,476,781 9,265,917 13 Exhibit OP-32A Appropriation Summary of Price/Program Growth === page 18 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Summary of Funding Increases and Decreases ($ In Thousands) FY 2026 President's Budget Request BA01 5,667,521 BA04 220,642 TOTAL 5,888,163 1. Congressional Adjustments a) Distributed Adjustments 1) Classified Adjustment (SAG: 13F) 2) P.L. 119-75 - Space Force Requested Transfer to RDTE (SAG: 13C) 3) P.L. 119-75 - Travel Allowance for Armed Forces Assigned to Alaska (SAG: 13Z) 4) Unjustified Growth (SAGs: Multiple) Total Distributed Adjustments b) Undistributed Adjustments 1) Historical Unobligated Balances (SAGs: Multiple) 2) Program Decrease - Projected Overestimation of Civilian Compensation (SAGs: Multiple) Total Undistributed Adjustments c) Adjustments to Meet Congressional Intent d) General Provisions 1) Bulk Fuels (SAGs: Multiple) 2) Savings Attributable to Efficiencies and Management Improvements (SAG: 13R) Total General Provisions FY 2026 Appropriated Amount -166,485 27,000 -72,500 15 -121,000 -166,485 -18,046 -5,600 -12,446 -18,046 0 -8,100 -1,607 -6,493 -8,100 5,474,890 -9,000 0 0 0 -9,000 -9,000 -6,884 -1,523 -5,361 -6,884 0 0 0 0 0 204,758 -175,485 27,000 -72,500 15 -130,000 -175,485 -24,930 -7,123 -17,807 -24,930 0 -8,100 -1,607 -6,493 -8,100 5,679,648 2. War-Related and Disaster Supplemental Appropriations a) Overseas Operations Funding b) Military Construction and Emergency Hurricane c) X-Year Carryover (Supplemental) FY 2026 Baseline Funding (Subtotal) 0 0 0 5,474,890 0 0 0 204,758 0 0 0 5,679,648 0 0 0 0 0 0 0 0 0 0 0 0 3. Fact-of-Life Changes a) Functional Transfers 1. Transfers In 2. Transfers Out b) Technical Adjustments 1. Increases 2. Decreases 14 Exhibit PB-31D Summary of Funding Increases and Decreases === page 19 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Summary of Funding Increases and Decreases ($ In Thousands) BA01 BA04 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 5,474,890 204,758 5,679,648 0 0 0 0 0 0 5,474,890 204,758 5,679,648 0 0 0 0 0 0 0 0 0 5,474,890 204,758 5,679,648 6. Price Change 106,534 2,954 109,488 7. Transfers a) Transfers In 1) Civilian Pay - Base Operation Support (SAG: 13Z) 2) Civilian Pay - Command and Control Manpower (SAGs: 13D,13C) 3) Civilian Pay - National Space Intelligence Center Manpower (SAG: 13C) 4) Civilian Pay - National Space Intelligence Center Manpower (SAG: 12A) 5) Civilian Pay - Space Force Acquisition Standup (SAG: 12A) 6) Civilian Pay - Sustainment Manpower (SAGs: 12A,13C) 7) National Space Intelligence Center (NSIC) (SAG: 13F) 170 29,718 1,528 572 3,370 25,177 11,660 0 0 0 0 0 0 0 170 29,718 1,528 572 3,370 25,177 11,660 c) Emergent Requirements 1. Program Increases a) One-Time Costs b) Program Growth 2. Program Reductions a) One-Time Costs b) Program Decreases FY 2026 Appropriated and Supplemental Funding 4. Anticipated Reprogramming (Requiring 1415 Actions) a) Increases b) Decreases Revised FY 2026 Estimate 5. Less: Emergency Supplemental Funding a) Less: War-Related and Disaster Supplemental Appropriation b) Less: X-Year Carryover Normalized FY 2026 Current Estimate 15 Exhibit PB-31D Summary of Funding Increases and Decreases === page 20 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Summary of Funding Increases and Decreases ($ In Thousands) 8) Operational Test & Training Infrastructure (SAG: 13F) 9) Realign Special Access Program Management Office Operational Funding (SAG: 13C) 10) Space Superiority - Satellite Communications (SAG: 13M) 11) Space Support - Wargaming (SAG: 13E) 12) Space Warning/Defense - Future Operationally Resilient Ground Evolution (FORGE) Sustainment (SAG: 12A) 13) Strategic Coordination Cell (SAG: 13F) Total Transfers In b) Transfers Out 1) Civilian Pay - Civilian Manpower Realignment (SAGs: 13F,42A) 2) Civilian Pay - Command & Control Manpower (SAG: 12A) 3) Civilian Pay - Command and Control Manpower (SAGs: Multiple) 4) Civilian Pay - National Space Intelligence Center Manpower (SAG: 42A) 5) National Space Intelligence Center (NSIC) (SAG: 13C) 6) Operational Test and Training Infrastructure (SAG: 13E) 7) Space Communications - Family of Advanced Beyond-Line-of-Sight Terminals (FAB-T) (SAG: 12A) 8) Space Superiority - Satellite Communications (SAG: 13W) Total Transfers Out FY 2027 Budget Request (Subtotal) 8. Program Increases a) Annualization of New FY 2026 Program b) One-Time FY 2027 Costs c) Program Growth in FY 2027 1) Base Operations Support - Fully Fund Enterprise Information Technology (SAG: 13Z) 2) Chief of Space Operations – Fix Integrated Security Enterprise (SAG: 42A) 3) Chief of Space Operations - Targeting Weaponeering Course (SAG: 42A) 4) Civilian Pay - Average Workyear Cost Adjustment (SAGs: Multiple) 5) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees (SAGs: Multiple) 6) Civilian Pay - Guardian Development (SAG: 13E) 7) Civilian Pay - Inter-Service Transfer Manpower (SAG: 13E) 8) Civilian Pay - Officer Training Course (SAG: 12A) 9) Civilian Pay - Support Squadron Standup (SAG: 42A) 10) Civilian Pay - Workforce Modernization (SAGs: Multiple) 16 BA01 32,816 5,054 18,054 7,000 148,100 5,750 288,969 BA04 0 0 0 0 0 0 0 TOTAL 32,816 5,054 18,054 7,000 148,100 5,750 288,969 -2,120 -1,759 -20,239 0 -11,660 -32,816 -39,410 -18,054 -126,058 5,744,335 -8,480 0 -5,448 -2,666 0 0 0 0 -16,594 191,118 -10,600 -1,759 -25,687 -2,666 -11,660 -32,816 -39,410 -18,054 -142,652 5,935,453 301,056 0 0 10,192 7,431 612 2,782 7,581 0 13,388 0 16,426 12,430 4,367 386 0 0 0 243,694 0 301,056 16,426 12,430 14,559 7,817 612 2,782 7,581 243,694 13,388 Exhibit PB-31D Summary of Funding Increases and Decreases === page 21 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Summary of Funding Increases and Decreases ($ In Thousands) 11) Civilian Pay - Exercise Support (SAG: 13E) 12) Classified Adjustments (SAGs: 13F,13W) 13) Facilities Operations Support - Cybersecurity (SAG: 13Z) 14) Facilities Sustainment - Classified (SAG: 13R) 15) Facilities Sustainment - Improving Unaccompanied Housing (SAG: 13R) 16) Facilities Sustainment - Resilient Operations (SAG: 13R) 17) Facilities Sustainment - Support Active Duty Military End Strength Growth (SAG: 13R) 18) Facilities Sustainment - USNORTHCOM Sustainment (SAG: 13R) 19) Intelligence, Surveillance and Reconnaissance (ISR) Support Activities - Fund Targeting, Modeling and Simulation (SAG: 13C) 20) NORAD Cheyenne Mountain Complex - Integrated Tactical Warning and Attack Assessment (SAG: 13W) 21) Position Navigation and Timing - Classified (SAG: 13C) 22) Position, Navigation, and Timing - Global Positioning System Operational Control System Sustainment (SAG: 13C) 23) Satellite Control Network (SAG: 13C) 24) Space Access - Ranges - Launch and Test Range Systems (SAG: 13A) 25) Space Command and Control - Assemble Integrated Operation Network Pathfinder (iONPath) (SAG: 13C) 26) Space Command and Control - Defensive Cyber Operations-Space (DCO-S) (SAG: 13D) 27) Space Superiority - Ballistic Missile Early Warning System (SAG: 13W) 28) Space Superiority - Defense Meteorological Satellite Program (SAG: 13W) 29) Space Superiority - Global Positioning System III Space Segment (SAG: 13W) 30) Space Superiority - Joint Tactical Ground System (SAG: 13W) 31) Space Superiority - NAVSTAR Global Positioning System (SAG: 13W) 32) Space Superiority - Satellite Communications (SAG: 13W) 33) Space Superiority - Satellite Control Network (SAG: 13W) 34) Space Superiority - Sea-Launched Ballistic Missile Radar Warning System (SAG: 13W) 35) Space Superiority - Space Based Infrared System (SAG: 13W) 36) Space Superiority - Space Control (SAG: 13C) 37) Space Superiority - Space Situation Awareness Operations (SAG: 13W) 38) Space Superiority - Space Support (SAG: 13C) 39) Space Support - Personnel and Financial Systems (SAG: 42A) 40) Space Support Funding (SAG: 13C) 41) Space Warning/Defense - Resilient Operations (SAG: 12A) 42) U.S. Space Force Exercises (SAG: 13E) 17 BA01 268 255,930 15,000 223,200 161,902 67,500 300,000 66,900 BA04 0 0 0 0 0 0 0 0 TOTAL 268 255,930 15,000 223,200 161,902 67,500 300,000 66,900 6,264 23,394 79,600 90,070 27,746 20,107 7,704 143,353 32,410 22,101 10,545 12,537 30,953 85,536 56,599 28,050 122,737 94,329 43,665 37,244 0 24,472 158,718 514,889 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17,625 0 0 0 6,264 23,394 79,600 90,070 27,746 20,107 7,704 143,353 32,410 22,101 10,545 12,537 30,953 85,536 56,599 28,050 122,737 94,329 43,665 37,244 17,625 24,472 158,718 514,889 Exhibit PB-31D Summary of Funding Increases and Decreases === page 22 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Summary of Funding Increases and Decreases ($ In Thousands) 43) U.S. Space Forces Central Service Component (SAG: 13F) 44) U.S. Space Forces Europe-Africa Service Component (SAG: 13F) 45) U.S. Space Forces Indo-Pacific Service Component (SAG: 13F) Total Program Growth in FY 2027 FY 2027 Budget Request (Subtotal) 9. Program Decreases a) One-Time FY 2026 Costs 1) P.L. 119-75 - Classified Programs (SAG: 13F) Total One-Time FY 2026 Costs b) Annualization of FY 2026 Program Decreases c) Program Decreases in FY 2027 1) Civilian Pay - Average Workyear Cost Adjustment (SAGs: Multiple) 2) Civilian Pay - Federal Employee Retirement System (SAG: 13F) 3) Space Communications - Commercial Proliferated Low Earth Orbit (pLEO) (SAG: 12A) 4) Space Superiority - Polar Adjunct (SAG: 13M) Total Program Decreases in FY 2027 FY 2027 Budget Request 18 BA01 8,152 7,269 13,523 3,135,709 8,880,044 BA04 0 0 0 294,928 486,046 TOTAL 8,152 7,269 13,523 3,430,637 9,366,090 -27,000 -27,000 0 0 -27,000 -27,000 -30,483 -2,949 -38,503 -1,238 -73,173 0 0 0 0 0 -30,483 -2,949 -38,503 -1,238 -73,173 8,779,871 486,046 9,265,917 Exhibit PB-31D Summary of Funding Increases and Decreases === page 23 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Personnel Summary ($ In Thousands) FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total)* Officer Enlisted 9,985 4,649 5,336 10,400 4,849 5,551 13,226 6,155 7,071 2,826 1,306 1,520 Civilian End Strength (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 2,661 2,661 2,661 0 2,661 0 2,923 2,923 2,923 0 2,923 0 5,022 5,022 5,022 0 5,022 0 2,099 2,099 2,099 0 2,099 0 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire 0 0 0 0 0 0 0 0 (Additional Military Technicians Assigned to USSOCOM) 0 0 0 0 Active Military Average Strength (A/S) (Total)* Officer Enlisted 4,993 2,325 2,668 10,193 4,749 5,444 11,813 5,502 6,311 1,621 753 868 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire 2,558 2,558 2,558 2,761 2,761 2,761 4,673 4,673 4,673 1,912 1,912 1,912 O & M, Active 19 Exhibit PB-31R Personnel Summary === page 24 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Personnel Summary ($ In Thousands) O & M, Active Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire FY 2025 0 2,558 0 FY 2026 0 2,761 0 FY 2027 0 4,673 0 Change FY 2026/2027 0 1,912 0 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 194 0 0 194 0 0 174 0 0 -20 15,929 18,219 27,066 8,847 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost ($s in Thousands) Contractor FTEs (Total) 20 Exhibit PB-31R Personnel Summary === page 25 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) (FY 2025) ($ in Thousands) Direct Funded Personnel (includes OC 13) D1. US Direct Hire (USDH) D1a. Senior Executive Schedule D1b. General Schedule D1c. Special Schedule D1d. Wage System D1e. Highly Qualified Experts D1f. Other D2. Direct Hire Program Foreign Nationals (DHFN) D3. Total Direct Hire D4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Direct Funded (excludes OC 13) D5. Other Object Class 13 Benefits D5a. USDH - Benefits for Former Employees D5b. DHFN - Benefits for Former Employees D5c. Voluntary Separation Incentive Pay (VSIP) D5d. Foreign National Separation Liability Accrual Reimbursable Funded Personnel (includes OC 13) R1. US Direct Hire (USDH) R1a. Senior Executive Schedule R1b. General Schedule R1c. Special Schedule R1d. Wage System R1e. Highly Qualified Experts R1f. Other R2. Direct Hire Program Foreign Nationals (DHFN) R3. Total Direct Hire R4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Reimbursable Funded (excludes OC 13) R5. Other Object Class 13 Benefits R5a. USDH - Benefits for Former Employees R5b. DHFN - Benefits for Former Employees R5c. Voluntary Separation Incentive Pay (VSIP) Rates a b c d e f g e+f+g h d+h i j Begin Strength 2,822 End Strength 2,661 FTEs 2,558 Basic Comp 363,731 Overtime Pay 97 Holiday Pay 18 Other O.C.11 18,183 Actuals Variables 18,298 Comp O.C.11 382,029 Benefits O.C.12/13 115,917 2,822 16 2,749 2,661 16 2,588 2,558 25 2,478 363,731 2,880 351,622 97 0 97 18 18 18,183 201 16,588 57 0 0 55 0 0 9,229 0 0 0 0 0 0 1,394 0 382,029 3,081 368,325 0 9,229 1,394 0 115,917 1,040 111,091 57 0 0 18,298 201 16,703 0 0 1,394 0 2,822 2,661 2,558 363,731 2,822 2,661 2,558 363,731 0 97 0 97 0 18 0 18 0 18,183 0 18,183 0 18,298 0 18,298 0 382,029 0 382,029 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 h/d o j/d p Actuals Comp $149,347 k/c n Comp & Benefits $194,662 % BC Variables 5.0% % BC Benefits 31.9% $142,194 $115,200 $141,897 $0 $167,800 $0 $0 $149,347 $123,240 $148,638 $0 $167,800 $0 $0 $194,662 $164,840 $193,469 $0 $236,636 $0 $0 5.0% 7.0% 4.8% 0.0% 0.0% 0.0% 0.0% 31.9% 36.1% 31.6% 0.0% 41.0% 0.0% 0.0% 0 497,946 0 497,946 0 0 0 0 0 $0 $142,194 $0 $142,194 $0 $149,347 $0 $149,347 $0 $194,662 $0 $194,662 0.0% 5.0% 0.0% 5.0% 0.0% 31.9% 0.0% 31.9% 0 0 $0 $0 $0 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0.0% 0.0% 3,786 0 115,917 0 115,917 0 i+j k Comp & Benefits 497,946 d/c l i/c m Basic Comp $142,194 497,946 4,121 479,416 0 13,015 1,394 0 Exhibit OP-8 Civilian Personnel Costs === page 26 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) (FY 2025) ($ in Thousands) Rates a b c d e f g e+f+g h d+h i Begin Strength End Strength FTEs Basic Comp Overtime Pay Holiday Pay Other O.C.11 Actuals Variables Comp O.C.11 Benefits O.C.12/13 0 i+j k Comp & Benefits 0 Total Personnel (includes OC 13) 2,822 2,661 2,558 363,731 97 18 18,183 18,298 382,029 115,917 T1. US Direct Hire (USDH) T1a. Senior Executive Schedule T1b. General Schedule T1c. Special Schedule T1d. Wage System T1e. Highly Qualified Experts T1f. Other 2,822 16 2,749 0 57 0 0 2,661 16 2,588 0 57 0 0 2,558 25 2,478 0 55 0 0 363,731 2,880 351,622 0 9,229 0 0 97 0 97 0 0 0 0 18 0 18 0 0 0 0 18,183 201 16,588 0 0 1,394 0 18,298 201 16,703 0 0 1,394 0 382,029 3,081 368,325 0 9,229 1,394 0 T2. Direct Hire Program Foreign Nationals (DHFN) T3. Total Direct Hire T4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Total Funded (excludes OC 13) T5. Other Object Class 13 Benefits T5a. USDH - Benefits for Former Employees T5b. DHFN - Benefits for Former Employees T5c. Voluntary Separation Incentive Pay (VSIP) T5d. Foreign National Separation Liability Accrual 0 2,822 0 2,822 0 2,661 0 2,661 0 2,558 0 2,558 0 363,731 0 363,731 0 97 0 97 0 18 0 18 0 18,183 0 18,183 0 18,298 0 18,298 0 382,029 0 382,029 R5d. Foreign National Separation Liability Accrual 22 d/c l i/c m Basic Comp 497,946 115,917 1,040 111,091 0 3,786 0 0 0 115,917 0 115,917 0 0 0 0 0 j h/d o j/d p Actuals Comp k/c n Comp & Benefits % BC Variables % BC Benefits $142,194 $149,347 $194,662 5.0% 31.9% 497,946 4,121 479,416 0 13,015 1,394 0 $142,194 $115,200 $141,897 $0 $167,800 $0 $0 $149,347 $123,240 $148,638 $0 $167,800 $0 $0 $194,662 $164,840 $193,469 $0 $236,636 $0 $0 5.0% 7.0% 4.8% 0.0% 0.0% 0.0% 0.0% 31.9% 36.1% 31.6% 0.0% 41.0% 0.0% 0.0% 0 497,946 0 497,946 0 0 0 0 0 $0 $142,194 $0 $142,194 $0 $149,347 $0 $149,347 $0 $194,662 $0 $194,662 0.0% 5.0% 0.0% 5.0% 0.0% 31.9% 0.0% 31.9% Exhibit OP-8 Civilian Personnel Costs === page 27 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) FY 2026 ($ in Thousands) Rates a b c d e f g e+f+g h d+h i j Begin Strength 2,661 End Strength 2,923 FTEs 2,761 Basic Comp 404,083 Overtime Pay 99 Holiday Pay 18 Other O.C.11 1,135 Enacted Variables 1,252 Comp O.C.11 405,335 Benefits O.C.12/13 131,685 2,661 16 2,588 2,923 14 2,858 2,761 16 2,688 404,083 2,938 396,197 99 18 99 18 1,135 209 926 51 0 0 57 0 0 4,948 0 0 0 0 0 0 0 405,335 3,147 397,240 0 4,948 0 0 131,042 1,061 128,200 57 0 0 1,252 209 1,043 0 0 0 0 2,661 2,923 2,761 404,083 2,661 2,923 2,761 404,083 0 99 0 99 0 18 0 18 1,135 0 1,135 0 1,252 0 1,252 0 405,335 0 405,335 Reimbursable Funded Personnel (includes OC 13) 0 0 0 0 0 0 0 0 R1. US Direct Hire (USDH) R1a. Senior Executive Schedule R1b. General Schedule R1c. Special Schedule R1d. Wage System R1e. Highly Qualified Experts R1f. Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 R2. Direct Hire Program Foreign Nationals (DHFN) R3. Total Direct Hire R4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Reimbursable Funded (excludes OC 13) R5. Other Object Class 13 Benefits R5a. USDH - Benefits for Former Employees R5b. DHFN - Benefits for Former Employees 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Direct Funded Personnel (includes OC 13) D1. US Direct Hire (USDH) D1a. Senior Executive Schedule D1b. General Schedule D1c. Special Schedule D1d. Wage System D1e. Highly Qualified Experts D1f. Other D2. Direct Hire Program Foreign Nationals (DHFN) D3. Total Direct Hire D4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Direct Funded (excludes OC 13) D5. Other Object Class 13 Benefits D5a. USDH - Benefits for Former Employees D5b. DHFN - Benefits for Former Employees D5c. Voluntary Separation Incentive Pay (VSIP) D5d. Foreign National Separation Liability Accrual 23 i+j k Comp & Benefits 537,020 d/c l i/c m h/d o j/d p Enacted Comp $146,807 k/c n Comp & Benefits $194,502 Basic Comp $146,354 % BC Variables 0.3% % BC Benefits 32.6% 1,781 0 0 536,377 4,208 525,440 0 6,729 0 0 $146,354 $183,625 $147,395 $0 $86,807 $0 $0 $146,807 $196,688 $147,783 $0 $86,807 $0 $0 $194,269 $263,000 $195,476 $0 $118,053 $0 $0 0.3% 7.1% 0.3% 0.0% 0.0% 0.0% 0.0% 32.4% 36.1% 32.4% 0.0% 36.0% 0.0% 0.0% 131,042 0 131,042 643 643 0 0 0 0 536,377 0 536,377 643 643 0 0 0 $0 $146,354 $0 $146,354 $0 $146,807 $0 $146,807 $0 $194,269 $0 $194,269 0.0% 0.3% 0.0% 0.3% 0.0% 32.4% 0.0% 32.4% 0 0 0 $0 $0 $0 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0.0% 0.0% Exhibit OP-8 Civilian Personnel Costs === page 28 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) FY 2026 ($ in Thousands) Rates a b c d e f g e+f+g h d+h i Begin Strength End Strength FTEs Basic Comp Overtime Pay Holiday Pay Other O.C.11 Enacted Variables Comp O.C.11 Benefits O.C.12/13 0 0 i+j k Comp & Benefits 0 0 Total Personnel (includes OC 13) 2,661 2,923 2,761 404,083 99 18 1,135 1,252 405,335 131,685 T1. US Direct Hire (USDH) T1a. Senior Executive Schedule T1b. General Schedule T1c. Special Schedule T1d. Wage System T1e. Highly Qualified Experts T1f. Other 2,661 16 2,588 0 57 0 0 2,923 14 2,858 0 51 0 0 2,761 16 2,688 0 57 0 0 404,083 2,938 396,197 0 4,948 0 0 99 0 99 0 0 0 0 18 0 18 0 0 0 0 1,135 209 926 0 0 0 0 1,252 209 1,043 0 0 0 0 405,335 3,147 397,240 0 4,948 0 0 T2. Direct Hire Program Foreign Nationals (DHFN) T3. Total Direct Hire T4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Total Funded (excludes OC 13) T5. Other Object Class 13 Benefits T5a. USDH - Benefits for Former Employees T5b. DHFN - Benefits for Former Employees T5c. Voluntary Separation Incentive Pay (VSIP) T5d. Foreign National Separation Liability Accrual 0 2,661 0 2,661 0 2,923 0 2,923 0 2,761 0 2,761 0 404,083 0 404,083 0 99 0 99 0 18 0 18 0 1,135 0 1,135 0 1,252 0 1,252 0 405,335 0 405,335 R5c. Voluntary Separation Incentive Pay (VSIP) R5d. Foreign National Separation Liability Accrual 24 d/c l i/c m Basic Comp 537,020 131,042 1,061 128,200 0 1,781 0 0 0 131,042 0 131,042 643 643 0 0 0 j h/d o j/d p Enacted Comp k/c n Comp & Benefits % BC Variables % BC Benefits $146,354 $146,807 $194,502 0.3% 32.6% 536,377 4,208 525,440 0 6,729 0 0 $146,354 $183,625 $147,395 $0 $86,807 $0 $0 $146,807 $196,688 $147,783 $0 $86,807 $0 $0 $194,269 $263,000 $195,476 $0 $118,053 $0 $0 0.3% 7.1% 0.3% 0.0% 0.0% 0.0% 0.0% 32.4% 36.1% 32.4% 0.0% 36.0% 0.0% 0.0% 0 536,377 0 536,377 643 643 0 0 0 $0 $146,354 $0 $146,354 $0 $146,807 $0 $146,807 $0 $194,269 $0 $194,269 0.0% 0.3% 0.0% 0.3% 0.0% 32.4% 0.0% 32.4% Exhibit OP-8 Civilian Personnel Costs === page 29 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) FY 2027 ($ in Thousands) Direct Funded Personnel (includes OC 13) D1. US Direct Hire (USDH) D1a. Senior Executive Schedule D1b. General Schedule D1c. Special Schedule D1d. Wage System D1e. Highly Qualified Experts D1f. Other D2. Direct Hire Program Foreign Nationals (DHFN) D3. Total Direct Hire D4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Direct Funded (excludes OC 13) D5. Other Object Class 13 Benefits D5a. USDH - Benefits for Former Employees D5b. DHFN - Benefits for Former Employees D5c. Voluntary Separation Incentive Pay (VSIP) D5d. Foreign National Separation Liability Accrual Reimbursable Funded Personnel (includes OC 13) R1. US Direct Hire (USDH) R1a. Senior Executive Schedule R1b. General Schedule R1c. Special Schedule R1d. Wage System R1e. Highly Qualified Experts R1f. Other R2. Direct Hire Program Foreign Nationals (DHFN) R3. Total Direct Hire R4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Reimbursable Funded (excludes OC 13) R5. Other Object Class 13 Benefits R5a. USDH - Benefits for Former Employees R5b. DHFN - Benefits for Former Employees Rates a b c d e f g e+f+g h d+h i j Begin Strength 2,923 End Strength 5,022 FTEs 4,673 Basic Comp 712,101 Overtime Pay 101 Holiday Pay 18 Other O.C.11 1,159 Request Variables 1,278 Comp O.C.11 713,379 Benefits O.C.12/13 100,616 2,923 14 2,858 5,022 17 4,933 4,673 20 4,582 712,101 3,435 702,881 101 18 101 18 72 71 5,785 1,278 213 1,065 0 0 0 0 713,379 3,648 703,946 0 5,785 0 0 99,960 809 97,792 51 0 0 1,159 213 946 0 0 2,923 5,022 4,673 712,101 101 18 1,159 5,022 4,673 712,101 101 18 1,159 0 713,379 0 713,379 0 99,960 2,923 0 1,278 0 1,278 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 h/d o j/d p Request Comp $152,660 k/c n Comp & Benefits $174,191 % BC Variables 0.2% % BC Benefits 14.1% $152,386 $171,750 $153,400 $0 $81,479 $0 $0 $152,660 $182,400 $153,633 $0 $81,479 $0 $0 $174,051 $222,850 $174,976 $0 $100,620 $0 $0 0.2% 6.2% 0.2% 0.0% 0.0% 0.0% 0.0% 14.0% 23.6% 13.9% 0.0% 23.5% 0.0% 0.0% 0 813,339 0 813,339 656 656 0 0 0 $0 $152,386 $0 $152,386 $0 $152,660 $0 $152,660 $0 $174,051 $0 $174,051 0.0% 0.2% 0.0% 0.2% 0.0% 14.0% 0.0% 14.0% 0 0 $0 $0 $0 0.0% 0.0% 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 0 0 0 $0 $0 $0 0.0% 0.0% 1,359 99,960 656 656 0 0 0 0 i+j k Comp & Benefits 813,995 d/c l i/c m Basic Comp $152,386 813,339 4,457 801,738 0 7,144 0 0 Exhibit OP-8 Civilian Personnel Costs === page 30 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Civilian Personnel Costs ($ In Thousands) FY 2027 ($ in Thousands) Rates a b c d e f g e+f+g h d+h i j Begin Strength End Strength FTEs Basic Comp Overtime Pay Holiday Pay Other O.C.11 Request Variables Comp O.C.11 Benefits O.C.12/13 Total Personnel (includes OC 13) 2,923 5,022 4,673 712,101 101 18 1,159 1,278 713,379 100,616 T1. US Direct Hire (USDH) T1a. Senior Executive Schedule T1b. General Schedule T1c. Special Schedule T1d. Wage System T1e. Highly Qualified Experts T1f. Other 2,923 14 2,858 0 51 0 0 5,022 17 4,933 0 72 0 0 4,673 20 4,582 0 71 0 0 712,101 3,435 702,881 0 5,785 0 0 101 0 101 0 0 0 0 18 0 18 0 0 0 0 1,159 213 946 0 0 0 0 1,278 213 1,065 0 0 0 0 713,379 3,648 703,946 0 5,785 0 0 T2. Direct Hire Program Foreign Nationals (DHFN) T3. Total Direct Hire T4. Indirect Hire Foreign Nationals (IHFN) Subtotal - Total Funded (excludes OC 13) T5. Other Object Class 13 Benefits T5a. USDH - Benefits for Former Employees T5b. DHFN - Benefits for Former Employees T5c. Voluntary Separation Incentive Pay (VSIP) T5d. Foreign National Separation Liability Accrual 0 2,923 0 2,923 0 5,022 0 5,022 0 4,673 0 4,673 0 712,101 0 712,101 0 101 0 101 0 18 0 18 0 1,159 0 1,159 0 1,278 0 1,278 0 713,379 0 713,379 R5c. Voluntary Separation Incentive Pay (VSIP) R5d. Foreign National Separation Liability Accrual 26 i+j k Comp & Benefits 0 0 d/c l i/c m h/d o j/d p Request Comp k/c n Comp & Benefits Basic Comp % BC Variables % BC Benefits 813,995 $152,386 $152,660 $174,191 0.2% 14.1% 99,960 809 97,792 0 1,359 0 0 813,339 4,457 801,738 0 7,144 0 0 $152,386 $171,750 $153,400 $0 $81,479 $0 $0 $152,660 $182,400 $153,633 $0 $81,479 $0 $0 $174,051 $222,850 $174,976 $0 $100,620 $0 $0 0.2% 6.2% 0.2% 0.0% 0.0% 0.0% 0.0% 14.0% 23.6% 13.9% 0.0% 23.5% 0.0% 0.0% 0 99,960 0 99,960 656 656 0 0 0 0 813,339 0 813,339 656 656 0 0 0 $0 $152,386 $0 $152,386 $0 $152,660 $0 $152,660 $0 $174,051 $0 $174,051 0.0% 0.2% 0.0% 0.2% 0.0% 14.0% 0.0% 14.0% Exhibit OP-8 Civilian Personnel Costs === page 31 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Reimbursable Civilian Personnel Costs, Part 2 ($ In Thousands) 27 Exhibit OP-8 Reimbursable Civilian Personnel Costs, Part 2 === page 32 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Reimbursable Civilian Personnel Costs, Part 2 ($ In Thousands) 28 Exhibit OP-8 Reimbursable Civilian Personnel Costs, Part 2 === page 33 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Reimbursable Civilian Personnel Costs, Part 2 ($ In Thousands) 29 Exhibit OP-8 Reimbursable Civilian Personnel Costs, Part 2 === page 34 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) I. Description of Operations Financed: Global Command, Control, Communication, Intelligence (C3I) & Early Warning includes resources that provide Strategic Offensive and Defensive C3I. Strategic Offensive C3I capability comprises the media through which interconnected airborne and ground-based command centers execute commands for offensive strikes against opposing threats. This capability must rely on systems that are fast, accurate, reliable, secure, resistant to destruction and disruption, and tailored to the needs of the President of the United States, Secretary of War, North American Aerospace Defense (NORAD) Command, United States Northern Command (USNORTHCOM), United States Space Command (USSPACECOM), United States Strategic Command (USSTRATCOM) and operational commanders. Strategic Defensive C3I provides radar surveillance and timely, reliable tactical warning of enemy attack through employment of a worldwide network of assets such as: Integrated Tactical Warning and Attack Assessment System; Ballistic Missile Early Warning System (BMEWS); Sea-Launched Ballistic Missile Radar Warning System; Ballistic Missile Defense Radar (Cobra Dane and Long Range Discriminating Radar (LRDR) and Space-Based Infrared System. The United States Nuclear Detonation (NUDET) Detection System provides a worldwide, highly survivable capability to detect, locate, characterize and report NUDETs in the earth's atmosphere or near space. 30 Exhibit OP-5, Subactivity Group 12A === page 35 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) These U.S. Space Force-wide communication programs support development of a survivable communications capability for worldwide Command and Control (C2) communications during pre-attack, trans-attack and post-attack periods. The U.S. Space Force provides satellite communication terminal facilities for Military Strategic and Tactical Relay (MILSTAR) Mission Control Segments required for system operations. The U.S. Space Force Military Satellite Communication (MILSATCOM) program sustains current capability and then modernizes the MILSATCOM infrastructure on a system-to-system basis. The Shared Early Warning System, a Presidential initiative, provides theater missile warning to allied and partner nations as well as situational awareness to Combatant Commanders. II. Force Structure Summary: The U.S. Space Force Global C3I & Early Warning program areas include Ballistic Missile Early Warning System (BMEWS), Sea-Launched Ballistic Missile (SLBM) and Ballistic Missile Defense Radar. The U.S. Space Force BMEWS and SLBM radar warning systems provide attack assessment data to the NORAD system, USNORTHCOM, USSTRATCOM, the Secretary of War, and the President of the United States. The upgraded early warning radars at Beale AFB, RAF Flyingdales, Cape Cod Space Force Station (SFS), Pituffik Space Base (previously-Thule Greenland), and Clear SFS will detect, track and classify possible ballistic missile threats to support Ground-based Midcourse Defense. Cobra Dane executes its missile defense mission by providing early observation of New Foreign Launches. Long Range Discriminating Radar (LRDR) will deny the adversary an opportunity to strike by fielding a persistent capability to discriminate and target missile threats in a complex countermeasure environment. All radars also provide space object detection and tracking data to the Space Surveillance Network. These ground-based systems work in conjunction with the space-based missile warning system, the Space-Based Infrared Systems (SBIRS), to provide assured missile warning. SBIRS currently employs Defense Support Program satellites to detect and track missiles through observation and processing of infrared energy emitted during the missile boost phase. The BMEWS consists of three operational radars providing warning of a limited or mass Intercontinental Ballistic Missile attack against North America, the United Kingdom and Europe, and a SLBM attack within the system's geographical coverage. BMEWS sites are located at Pituffik Space Base, Greenland; RAF Flyingdales, United Kingdom; and Clear SFS, Alaska. The SLBM Radar Warning System, which consists of four sites (three operational), detects and provides warning of an SLBM attack against North America through two radar systems: the Precision Acquisition Vehicle Entry Phased Array Warning System (PAVE PAWS) and the Perimeter Acquisition Radar Attack Characterization System (PARCS). PAVE PAWS sites are located at Cape Cod SFS, Massachusetts; Beale AFB, California; and Robins AFB, Georgia (non-operational, in cold storage). The PARCS site is at Cavalier SFS, North Dakota. Ballistic Missile Defense Radars are located at Eareckson Air Station (Cobra Dane) and Clear SFS (LRDR), Alaska. Cobra Dane and LRDR have missile defense as their primary mission and Space Domain Awareness (SDA) as their secondary mission. SDA is a worldwide Space Surveillance network of electro-optical, and radar sensors. These provide space object cataloging and identification, resident space object maneuver detection, notification of satellite flyover, space treaty monitoring, scientific and technical intelligence gathering. 31 Exhibit OP-5, Subactivity Group 12A === page 36 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) III. Financial Summary ($ in Thousands): A. Program Elements GLOBAL C3I & EARLY WARNING SUBACTIVITY GROUP TOTAL FY 2026 FY 2025 Actuals $611,816 $611,816 Budget Request $846,856 $846,856 32 Amount $-58,170 $-58,170 Percent -6.87% -6.87% Appn $788,686 $788,686 Normalized Current Enacted $788,686 $788,686 FY 2027 Request $1,056,824 $1,056,824 Exhibit OP-5, Subactivity Group 12A === page 37 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $846,856 -48,000 -9,923 0 -247 788,686 0 0 0 788,686 0 0 0 $788,686 $788,686 15,619 120,143 132,376 $1,056,824 The FY 2026 spend plan amount for Global Command, Control, Communications & Intelligence & Early Warning includes $788,686 thousand of discretionary and $795 thousand of mandatory (reconciliation) for a total of $789,481 thousand. 33 Exhibit OP-5, Subactivity Group 12A === page 38 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $846,856 1. Congressional Adjustments .................................................................................................................................................................................................................. $-58,170 a) Distributed Adjustments ................................................................................................................................................................................................... $-48,000 1) Unjustified Growth .................................................................................................................................................................................. $-48,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-9,923 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,000 2) Program Decrease - Projected Overestimation of Civilian Compensation .............................................................................................. $-8,923 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ................................................................................................................................................................................................................ $-247 1) Bulk Fuels ................................................................................................................................................................................................... $-247 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $788,686 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 34 Exhibit OP-5, Subactivity Group 12A === page 39 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $788,686 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $788,686 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $788,686 6. Price Change ..........................................................................................................................................................................................................................................$15,619 7. Transfers .............................................................................................................................................................................................................................................. $120,143 a) Transfers In ..................................................................................................................................................................................................................... $161,312 35 Exhibit OP-5, Subactivity Group 12A === page 40 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 1) Space Warning/Defense - Future Operationally Resilient Ground Evolution (FORGE) Sustainment.................................................. $148,100 Increase reflects transfer to Global C3I & Early Warning (Subactivity Group 12A +148,100) from Research, Develop, Testing, and Evaluation, U.S. Space Force (-$148,100) to realign FORGE, which is a ground system that controls missile warning systems, missile tracking systems, and provides battlespace awareness. This funding supports the U.S. Space Force's investment in resilient operations, critical to combat the increasingly contested and competitive space domain. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts Space Support (FY 2026 Base: $240,251) 2) Civilian Pay - Sustainment Manpower ...................................................................................................................................................... $9,270 Increase transfers funding and manpower to Global C3I & Early Warning (Subactivity Group 12A, +$9,270, 56 FTEs) and Space Operations (Subactivity Group 13C, +$15,907, 95 FTEs) from Space Force Research, Development, Test and Evaluation (RDT&E) in an effort to unify all elements of readiness to aid in the advancement of the Space Force mission. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; 56 FTE) 3) Civilian Pay - Space Force Acquisition Standup....................................................................................................................................... $3,370 Increase transfers funding and manpower to Global C3I & Early Warning (Subactivity Group 12A, +$3,370, 35 FTEs) from U.S. Air Force Operations & Maintenance to support the standup of Space Acquisition Integration Office (SAIO). OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; 35 FTE) 36 Exhibit OP-5, Subactivity Group 12A === page 41 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 4) Civilian Pay - National Space Intelligence Center Manpower ..................................................................................................................... $572 Increase transfers funding to Global C3I & Early Warning (Subactivity Group 12A, $572, 6 FTEs) and Space Operations (Subactivity Group 13C, +$1,528, 18 FTEs) from Administration (Subactivity Group 42A, -2,666, 24 FTEs). This transfer realigns manpower to meet U.S. Space Force security requirements to support National Space Intelligence Center (NSIC). NSIC is one of the primary sources of intel within the USSF, utilized to accurately target, track and assess foreign space capabilities and emerging threats across the space domain. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; 6 FTE) b) Transfers Out ................................................................................................................................................................................................................... $-41,169 1) Space Communications - Family of Advanced Beyond-Line-of-Sight Terminals (FAB-T) .................................................................... $-39,410 Decrease reflects transfer from Global C3I & Early Warning (Subactivity Group 12A -39,410) to Operation and Maintenance, U.S. Air Force, Global C3I & Early Warning (Subactivity Group 12A +$39,410) to realign FAB-T Presidential and National Voice Conferencing (PNVC) equipment and maintenance requirements to the U.S. Air Force's Program Executive Office for Nuclear Command, Control, and Communications (NC3) for execution. OP32: 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $40,626) 37 Exhibit OP-5, Subactivity Group 12A === page 42 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 2) Civilian Pay - Command & Control Manpower ........................................................................................................................................ $-1,759 Decrease transfers funding and manpower from Global C3I & Early Warning (Subactivity Group 12A -$1,759, -17 FTEs), Education & Training (Subactivity Group 13E, -$9,320, -52 FTEs), Special Programs (Subactivity Group 13F, -$10,919, -54 FTEs), Logistics Operations (Subactivity Group 41A, -$470, -5 FTEs) and Administration (Subactivity Group 42A, -$4,978, -27 FTEs) to Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) and Cyberspace Activites (Subactivity Group 13D, $8,261, 45 FTEs) to realign resources to support the mission requirements for the standup of U.S. Space Force - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; -17 FTE) 8. Program Increases .............................................................................................................................................................................................................................. $170,879 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $170,879 1) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ........................................................................................ $825 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581) 38 Exhibit OP-5, Subactivity Group 12A === page 43 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 2) Civilian Pay - Officer Training Course ....................................................................................................................................................... $7,581 Increase funding and manpower (85 FTEs) for instructors at the U.S. Space Force Officer Training Course move to Peterson Space Force Base and personnel supporting the Space Operations facility at Schriever Space Force Base. This move will optimize operational efficiency and overall force capability through the staffing of critical positions. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; 85 FTE) 3) Civilian Pay - Workforce Modernization .................................................................................................................................................... $3,755 Increase funding and manpower (51 FTEs) reflects the alignment of civilian staffing to validated mission requirements pursuant to Executive Order 14210, implementing the President’s Department of Government Efficiency Workforce Optimization Initiative and the March 2025 Deputy Secretary of War memorandum. The Air Force conducted comprehensive data-hygiene and manpower-validation efforts, resulting in a correction where FY2026 staffing levels were set below the Airlift Operations Program established requirements. The FY2027 request reflects the full requirement necessary to support mission execution and workforce modernization. OP32: 101 Executive General Schedule (FY 2026 Base: $106,954; FTE Base: 581; 51 FTE) 4) Space Warning/Defense - Resilient Operations ................................................................................................................................... $158,718 This specific increase funds supplies and equipment purchases to standup new operation centers and fielding of the new FORGE system into the overarching portfolio to enhance and modernize the Spaced Based Infrared Systems (SBIRS). The SBIRS are critical for enhancing the resilience and survivability of our nation's missile warning defense architecture. This system provides essential early warning for missiles, missile defense, battlespace awareness, and technical intelligence. This funding supports the U.S. Space Force's investment in resilient operations, critical to combat the increasingly contested and competitive space domain. OP32: 920 Supplies & Materials (Non-Fund) 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) 957 Land and Structures (FY 2026 Base: $240,251) 39 Exhibit OP-5, Subactivity Group 12A === page 44 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 9. Program Decreases .............................................................................................................................................................................................................................. $-38,503 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ....................................................................................................................................................................................... $-38,503 1) Space Communications - Commercial Proliferated Low Earth Orbit (pLEO) ........................................................................................ $-38,503 Decrease after a large initial FY 2026 investment to establish Proliferated (large number) Low Earth Orbit (pLEO) broadband commercial SATCOM services and commercial off the-shelf Ku-band and Ka-band commercial user terminals for the Services. In FY2026, USSF initial investments included purchases of user terminals, the FY2027 request sustains required funding to provide broadband SATCOM capabilities for each of the Services. OP32: 927 Air Defense Contracts Space Support (FY 2026 Base: $197,000) FY 2027 Budget Request.................................................................................................................................................................................................................... $1,056,824 40 Exhibit OP-5, Subactivity Group 12A === page 45 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) IV. Performance Criteria and Evaluation Summary: Combat Forces Space Support Global Command and Control Installation Operations and Security Medical Readiness Space Communications Space Support Space Warning/Defense Weather Total FY 2025 Actuals 32,421 60,137 659 304 220,912 12,313 284,493 577 611,816 FY 2026 Enacted 27,010 61,598 517 457 425,269 22,284 250,335 1,216 788,686 41 FY 2027 Request 81,707 62,894 526 467 385,819 28,472 495,578 1,361 1,056,824 Exhibit OP-5, Subactivity Group 12A === page 46 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) V. Personnel Summary: Active Military End Strength (E/S) (Total) Officer Enlisted Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 42 FY 2025 FY 2026 FY 2027 Change FY 2026/2027 1,854 552 1,302 1,839 546 1,293 1,651 437 1,214 -188 -109 -79 468 468 468 0 468 0 581 581 581 0 581 0 797 797 797 0 797 0 216 216 216 0 216 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 185 0 0 184 0 0 164 0 0 -20 2,123 3,225 3,994 769 Exhibit OP-5, Subactivity Group 12A === page 47 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 130,418 CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 85,368 0 1.28% 1,093 20,346 106,807 0 0.28% 299 23,312 103 WAGE BOARD 1,402 0 1.28% 18 -1,420 0 0 0.28% 0 0 0 110 UNEMPLOYMENT COMPENSATION 0 0 2.90% 0 147 147 0 2.10% 3 0 150 121 PCS BENEFITS 9 0 2.90% 0 -9 0 0 2.10% 0 0 0 86,779 0 1,111 19,064 106,954 0 302 23,312 130,568 TRAVEL OF PERSONS 9,340 0 234 -6,931 2,643 0 56 18,307 21,006 TOTAL TRAVEL 9,340 0 234 -6,931 2,643 0 56 18,307 21,006 779 0 1.10% 9 89 877 0 -7.08% -62 341 1,156 6,162 0 4.54% 280 -101 6,341 0.61% TOTAL CIVILIAN PERSONNEL COMPENSATION TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 DLA ENERGY (FUEL PRODUCTS) 414 AIR FORCE CONSOLIDATED SUSTAINMENT AG (SUPPLY) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 5,506 0 5.78% 318 338 4,014 0 5.79% 232 1,577 5,823 0 TOTAL DWCF SUPPLIES AND MATERIALS 10,299 0 559 2,004 12,862 0 AIR FORCE FUND EQUIPMENT 0 0 0 0 0 0 TOTAL DWCF EQUIPMENT PURCHASES 0 0 0 0 0 0 418 36 132 5,991 253 373 13,488 0 0 0 0 0 0 DWCF EQUIPMENT PURCHASES 505 2.50% 2.10% OTHER FUND PURCHASES 633 DLA DOCUMENT SERVICES 1 0 0.02% 0 12 13 0 3.30% 0 0 13 671 DISN INFRASTRUCTURE SERVICES (DISN-IS) 1,381 0 -8.00% -110 1,625 2,896 0 0.00% 0 80 2,976 TOTAL OTHER FUND PURCHASES 1,382 0 -110 1,637 2,909 0 0 80 2,989 1,124 0 197 -1,321 0 0 0 0 0 TRANSPORTATION 703 JCS EXERCISES 17.50% 43 -19.64% Exhibit OP-5, Subactivity Group 12A === page 48 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) 705 AMC CHANNEL CARGO 706 AMC CHANNEL PASSENGER 708 MSC CHARTERED CARGO 771 COMMERCIAL TRANSPORTATION TOTAL TRANSPORTATION FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 206 0 74.80% 154 -360 0 0 -1.99% 0 0 0 0 0 86.40% 0 0 0 0 -47.20% 0 0 0 5,518 0 2.50% 138 -4,853 803 0 2.10% 17 342 1,162 2.50% 2.10% 10 -2 472 27 340 1,634 679 1 7,527 1 17 -236 461 3 506 -6,770 1,264 3 OTHER PURCHASES 913 PURCHASED UTILITIES (NON-FUND) 914 PURCHASED COMMUNICATIONS (NON-FUND) 915 RENTS (NON-GSA) 917 POSTAL SERVICES (U.S.P.S) 920 SUPPLIES & MATERIALS (NON-FUND) 35 0 2.50% 1 28 64 0 2.10% 1 0 65 6,946 0 2.50% 174 -3,505 3,615 0 2.10% 76 27 3,718 45 0 2.50% 1 2,826 2,872 0 2.10% 60 21 2,953 0 0 2.50% 0 0 0 0 2.10% 0 0 0 8,784 -2 2.50% 220 -885 8,117 32 2.10% 171 25,835 34,155 921 PRINTING & REPRODUCTION 21 0 2.50% 1 -22 0 0 2.10% 0 0 0 922 EQUIPMENT MAINTENANCE BY CONTRACT 12,592 -1 2.50% 315 4,291 17,197 9 2.10% 361 89 17,656 923 OPERATION AND MAINTENANCE OF FACILITIES 55,293 -50 2.50% 1,381 -17,256 39,368 667 2.10% 841 4,494 45,370 925 EQUIPMENT PURCHASES (NON-FUND) 30,352 0 2.50% 759 -29,498 1,613 5 2.10% 34 26,686 28,338 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 260,713 -24 2.50% 6,517 291,738 558,944 304 2.10% 11,744 144,468 715,460 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 41,037 0 2.50% 1,026 -20,531 21,532 0 2.10% 452 -11,067 10,917 933 STUDIES, ANALYSIS, & EVALUATIONS 0 0 2.50% 0 694 694 0 2.10% 15 16 725 934 48,225 0 2.50% 1,206 -43,820 5,611 0 2.10% 118 1,298 7,027 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 17 0 2.50% 0 -17 0 0 2.10% 0 0 0 955 MEDICAL CARE 1,937 -2 4.00% 77 -2,012 0 32 3.90% 1 -33 0 957 LAND AND STRUCTURES 8,595 0 2.50% 215 -8,174 636 0 2.10% 13 18,265 18,914 960 INTEREST AND DIVIDENDS 0 0 2.50% 0 0 0 0 2.10% 0 0 0 964 SUBSISTENCE AND SUPPORT OF PERSONS 0 0 2.50% 0 186 186 0 2.10% 4 1 191 985 RESEARCH AND DEVELOPMENT CONTRACTS 847 0 2.50% 21 -868 0 0 2.10% 0 0 0 987 OTHER INTRA-GOVERNMENT PURCHASES 17,133 0 2.50% 428 -17,410 151 0 2.10% 3 2 156 989 OTHER SERVICES 3,917 1 2.50% 98 -2,562 1,454 3 2.10% 31 6 1,494 496,489 -78 12,439 153,204 662,054 1,052 13,926 210,107 887,139 TOTAL OTHER PURCHASES 44 Exhibit OP-5, Subactivity Group 12A === page 49 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Global C3I & Early Warning ($ In Thousands) GRAND TOTAL FY 2025 Program FC Rate Diff 611,816 -77 Price Growth Percent 45 Price Growth Program Growth FY 2026 Program FC Rate Diff 14,738 162,209 788,686 1,055 Price Growth Percent Price Growth Program Growth FY 2027 Program 14,564 252,519 1,056,824 Exhibit OP-5, Subactivity Group 12A === page 50 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) I. Description of Operations Financed Space launch operations are comprised of the Spacelift Range System, also known as the Launch and Test Range System (LTRS), and the U.S. Space Force launch service procurement programs, National Security Space Launch (NSSL) and Rocket System Launch Program (RSLP). The Spacelift Range System provides tracking, telemetry, communications, range safety, weather and other support for Department of War (DoW), civil and commercial space launches, intercontinental and sealaunched ballistic missile Test and Evaluation (T&E), missile defense developmental T&E and aeronautical T&E. The Spacelift Range System is also responsible for infrastructure maintenance functions, to include heating and air conditioning, fire protection, detection, corrosion control and are responsible for payload, launch vehicle operations and range activities necessary to operate and maintain range systems. The U.S. Space Force's launch programs, NSSL and RSLP, provide launch and operational support for DoW and Intelligence Community space vehicle programs. Funding sustains a robust launch infrastructure and industrial base to ensure the capability to launch National Security Space payloads. II. Force Structure Summary Spacelift Ranges consist of the Western Range located at Space Launch Delta 30, Vandenberg Space Force Base, California, and the Eastern Range, located at Space Launch Delta 45, Cape Canaveral Space Force Station, Florida. The launch base support for common infrastructure at the launch complexes are government owned, government maintained, and are composed of facilities and equipment to include: launch pads, command centers, radar and optical tracking sites, command destruct sites, telemetry sites, utilities, water treatment, roads, and transportation. All sustainment and maintenance is under the purview of the base civil engineering office. The U.S. Space Force leverages National Security Space Launch (NSSL) consisting of the Falcon 9, Falcon Heavy, Neutron, New Glenn, Nova, and Vulcan for medium-toheavy lift requirements. In support of responsive space and Research, Development, Test and Evaluation (RDT&E) small launch requirements, the U.S. Space Force uses Rocket Systems Launch Program (RSLP) to access 12 launch service providers' launch systems, such as Alpha, Electron, and Minotaur IV. 46 Exhibit OP-5, Subactivity Group 13A === page 51 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements SPACE LAUNCH OPERATIONS SUBACTIVITY GROUP TOTAL FY 2025 Actuals $356,741 $356,741 Budget Request $397,822 $397,822 47 Amount $-2,251 $-2,251 Percent -0.57% -0.57% Appn $395,571 $395,571 Normalized Current Enacted $395,571 $395,571 FY 2027 Request $415,322 $415,322 Exhibit OP-5, Subactivity Group 13A === page 52 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $397,822 0 -2,251 0 0 395,571 0 0 0 395,571 0 0 0 $395,571 $395,571 48 7,166 0 12,585 $415,322 Exhibit OP-5, Subactivity Group 13A === page 53 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $397,822 1. Congressional Adjustments .................................................................................................................................................................................................................... $-2,251 a) Distributed Adjustments ............................................................................................................................................................................................................. $0 b) Undistributed Adjustments ................................................................................................................................................................................................. $-2,251 1) Program Decrease - Projected Overestimation of Civilian Compensation .............................................................................................. $-2,251 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $395,571 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 49 Exhibit OP-5, Subactivity Group 13A === page 54 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $395,571 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $395,571 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $395,571 6. Price Change ............................................................................................................................................................................................................................................$7,166 7. Transfers .......................................................................................................................................................................................................................................................... $0 a) Transfers In ................................................................................................................................................................................................................................ $0 b) Transfers Out ............................................................................................................................................................................................................................. $0 8. Program Increases .................................................................................................................................................................................................................................$21,407 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 50 Exhibit OP-5, Subactivity Group 13A === page 55 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ............................................................................................................................................................................................. $21,407 1) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ........................................................................................ $292 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $57,046; FTE Base: 283) 2) Civilian Pay - Workforce Modernization .................................................................................................................................................... $1,008 Increase funding and manpower (12 FTEs) reflects the alignment of civilian staffing to validated mission requirements pursuant to Executive Order 14210, implementing the President’s Department of Government Efficiency Workforce Optimization Initiative and the March 2025 Deputy Secretary of War memorandum. The Air Force conducted comprehensive data-hygiene and manpower-validation efforts, resulting in a correction where FY2026 staffing levels were set below the Airlift Operations Program established requirements. The FY2027 request reflects the full requirement necessary to support mission execution and workforce modernization. OP32: 101 Executive General Schedule (FY 2026 Base: $57,046; FTE Base: 283; 12 FTE) 51 Exhibit OP-5, Subactivity Group 13A === page 56 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) 3) Space Access - Ranges - Launch and Test Range Systems ................................................................................................................ $20,107 Increase funds an expanded contract to meet launch mission operational requirements and maintain adequate funding for range support. This follow-on to the Launch and Test Range System (LTRS) Integrated Support Contract (LISC) funds continuous tracking, telemetry, flight safety, and support to space launches and ballistic missile tests to meet Fiscal Years 2027 - 2031 requirements of both Eastern and Western Range through transition to Spaceports. It modernizes and sustains aging range assets to ensure public safety and assured access to space, reduces risk of launch and test delays while accommodating a threefold increase in commercial launch demand, and provide support of major range and test facility base customers. This helps mitigate the increased commercial launch activity that is straining spaceport capacity. OP32: 927 Air Defense Contracts Space Support (FY 2026 Base: $382,660) 9. Program Decreases ................................................................................................................................................................................................................................ $-8,822 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ......................................................................................................................................................................................... $-8,822 1) Civilian Pay - Average Workyear Cost Adjustment.................................................................................................................................. $-8,822 Decrease in Civilian Personnel compensation adjusts average workyear costs. Each year the U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these changes as well as updated pay raise, awards and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $57,046; FTE Base: 283) 52 Exhibit OP-5, Subactivity Group 13A === page 57 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) FY 2027 Budget Request....................................................................................................................................................................................................................... $415,322 53 Exhibit OP-5, Subactivity Group 13A === page 58 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) IV. Performance Criteria and Evaluation Summary: SUPPORTED LAUNCHES BY VEHICLE (DOW, NASA AND COMMERCIAL) FY 2025 Actuals 3 0 163 1 3 0 0 0 0 1 13 0 2 1 0 1 0 188 ATLAS V Delta IV HEAVY FALCON 9 FALCON HEAVY ICBM SENTINEL OBV MINOTAUR I MINOTAUR II+ MINOTAUR IV OTHER (SLS Talon, RavnX and Trident) PEGASUS XL VULCAN FIREFLY TERRAN New Glenn Astra V.4 TOTAL FY 2026 Enacted 7 0 135 3 3 0 0 0 0 1 4 0 13 5 0 6 0 177 FY 2027 Request 3 0 132 6 3 1 0 1 0 1 3 0 9 1 5 0 1 166 NOTE: This table outlines the current launch manifest, a key tool for navigating the competitive landscape of satellite deployment. The dynamic nature of this environment, driven by intense competition for trajectory slots and a range of operational variables, presents both challenges and opportunities. This data is essential for agile decision-making and capitalizing on emergent launch windows. 54 Exhibit OP-5, Subactivity Group 13A === page 59 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) SF Launch Schedule By Vehicle (NSSL & RSLP Procured, VAFB SFB, CA & CC SFS, FL Only) ATLAS V DELTA IV HEAVY FALCON 9 FALCON HEAVY ICBM SENTINEL OTHER MINOTAUR I MINOTAUR IV FIREFLY ALPHA ASTRA-4 VULCAN TOTAL 55 FY 2025 Actuals 0 0 4 0 0 0 0 0 0 0 0 1 5 FY 2026 Enacted 0 0 11 0 0 0 0 0 1 0 0 5 17 FY 2027 Request 0 0 12 3 0 0 0 1 1 1 1 7 26 Exhibit OP-5, Subactivity Group 13A === page 60 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 209 191 18 209 191 18 166 153 13 -43 -38 -5 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 302 302 302 0 302 0 283 283 283 0 283 0 295 295 295 0 295 0 12 12 12 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 204 0 0 201 0 0 168 0 0 -34 1,343 1,602 1,736 134 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 56 Exhibit OP-5, Subactivity Group 13A === page 61 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 61,336 0 1.28% 785 -5,178 56,943 0 0.28% 159 -7,683 49,419 231 0 1.28% 3 -234 0 0 0.28% 0 0 0 0 0 2.90% 0 103 103 0 2.10% 2 0 105 61,567 0 788 -5,309 57,046 0 162 -7,684 49,524 TRAVEL OF PERSONS 2,008 0 50 -1,850 208 0 4 -25 187 TOTAL TRAVEL 2,008 0 50 -1,850 208 0 4 -25 187 4,203 CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 103 WAGE BOARD 110 UNEMPLOYMENT COMPENSATION TOTAL CIVILIAN PERSONNEL COMPENSATION TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 DLA ENERGY (FUEL PRODUCTS) 0 1.10% 46 -3,289 960 0 -7.08% -68 105 997 414 AIR FORCE CONSOLIDATED SUSTAINMENT AG (SUPPLY) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 845 0 5.78% 49 1,327 2,221 0 4.54% 101 -38 2,284 1,020 0 5.79% 59 2,781 3,860 0 0.61% 24 84 3,968 TOTAL DWCF SUPPLIES AND MATERIALS 6,068 0 154 819 7,041 0 56 152 7,249 418 DWCF EQUIPMENT PURCHASES 505 AIR FORCE FUND EQUIPMENT 0 0 TOTAL DWCF EQUIPMENT PURCHASES 0 0 DISN INFRASTRUCTURE SERVICES (DISN-IS) 354 0 TOTAL OTHER FUND PURCHASES 354 0 2.50% 0 17 17 0 0 17 17 0 -28 966 1,292 0 -28 966 1,292 0 2.10% 0 0 17 0 0 17 0 36 1,328 0 36 1,328 OTHER FUND PURCHASES 671 -8.00% 0.00% TRANSPORTATION 708 MSC CHARTERED CARGO 747 0 2.50% 19 376 1,142 0 2.10% 24 8 1,174 771 COMMERCIAL TRANSPORTATION 38 0 2.50% 1 435 474 0 2.10% 10 3 487 57 Exhibit OP-5, Subactivity Group 13A === page 62 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Launch Operations ($ In Thousands) TOTAL TRANSPORTATION FY 2025 Program FC Rate Diff 785 0 Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff 20 811 1,616 0 Price Growth Percent Price Growth Program Growth FY 2027 Program 34 11 1,661 OTHER PURCHASES 914 PURCHASED COMMUNICATIONS (NON-FUND) 5,718 0 2.50% 143 -5,849 12 0 2.10% 0 0 12 920 SUPPLIES & MATERIALS (NON-FUND) 3,036 0 2.50% 76 -5 3,107 0 2.10% 65 24 3,196 921 PRINTING & REPRODUCTION 45 0 2.50% 1 -37 9 0 2.10% 0 0 9 922 EQUIPMENT MAINTENANCE BY CONTRACT 4,278 0 2.50% 107 -172 4,213 0 2.10% 88 32 4,333 923 OPERATION AND MAINTENANCE OF FACILITIES 0 0 2.50% 0 0 0 0 2.10% 0 0 0 925 EQUIPMENT PURCHASES (NON-FUND) 3,459 0 2.50% 86 912 4,457 0 2.10% 94 29 4,580 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 257,032 0 2.50% 6,426 51,941 315,399 0 2.10% 6,623 20,015 342,037 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 1,219 0 2.50% 30 -1,249 0 0 2.10% 0 0 0 933 STUDIES, ANALYSIS, & EVALUATIONS 0 0 2.50% 0 5 5 0 2.10% 0 3 8 934 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 2,913 0 2.50% 73 -2,986 0 0 2.10% 0 0 0 60 0 2.50% 2 -62 0 0 2.10% 0 0 0 935 955 MEDICAL CARE 957 LAND AND STRUCTURES 960 INTEREST AND DIVIDENDS 987 OTHER INTRA-GOVERNMENT PURCHASES 989 OTHER SERVICES 906 0 4.00% 36 -182 760 0 3.90% 30 -8 782 2,737 0 2.50% 68 -2,686 119 0 2.10% 2 1 122 0 0 2.50% 0 0 0 0 2.10% 0 0 0 2,388 0 2.50% 60 -2,178 270 0 2.10% 6 1 277 2.50% 2.10% 2,168 0 54 -2,222 0 0 0 0 0 TOTAL OTHER PURCHASES 285,959 0 7,163 35,229 328,351 0 6,909 20,096 355,356 GRAND TOTAL 356,741 0 8,146 30,684 395,571 0 7,166 12,585 415,322 58 Exhibit OP-5, Subactivity Group 13A === page 63 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) I. Description of Operations Financed Space Operations encompasses a multitude of programs to include the Satellite Control Network (SCN, previously known as Air Force SCN), Space and Missile Test Evaluation Center, satellite systems, and other space operations. SCN provides assured access to operational Department of War (DoW) satellites, the global network of control centers, remote tracking stations and communications links required to operate national security satellites for operations, research, and development. SCN is the only United States system uniquely designed to recover tumbling satellites using high power commands in a specially selected radio-frequency spectrum. SCN provides funding for operations, maintenance, sustainment, communications, logistics and management of SCN control centers at Vandenberg Space Force Base, California, and Schriever Space Force Base, Colorado, and eight other remote tracking stations located worldwide. The Space and Missile Test and Evaluation Center performs space test and support operations for National Security Space advanced technology satellites. The center performs vital pre-launch validation testing between ground elements and spacecraft. The program also supports telemetry collection from operational missions using transportable systems when no other site has the capability. Satellite Systems include the Defense Meteorological Satellite Program (DMSP), Electro-Optical/Infrared (EO/IR) Weather System – Geostationary (EWS-G), and Navigation Signal Timing and Ranging (NAVSTAR) Global Positioning System (GPS). DMSP collects and disseminates global visible and infrared cloud imagery and other specialized atmospheric, land surface, oceanographic and space environment data to support worldwide DoW operations and high priority national programs. DMSP is the primary source of high-resolution weather imagery supporting critical Space Force, Air Force, Army, Navy, and Marine Corps centralized and theater missions with each satellite providing a global refresh every 12 hours. EWS-G, the former National Oceanic and atmospheric Administration Geostationary Operational Environmental Satellite-13 (weather satellite), moved to a new orbital slot over the Indian Ocean (IO) Area of Responsibility (AoR), reached full operational capability in fiscal Year 2021 and provides cloud characterization and theater weather imagery in support of the Intelligence Community and Combatant Command (CCMD) mission planning, execution and Battle Damage Assessment. GPS is a space-based radio navigation all weather system that provides 24-hour, extremely accurate three dimensional positioning, velocity and time information to an unlimited number of U.S., allied military and civil users worldwide. GPS satellites circle the globe every 12 hours, emitting continuous navigational signals. Other space operations in this Subactivity Group include space mission activities conducted by United States Space Command (USSPACECOM), United States Strategic Command (USSTRATCOM), United States Northern Command (USNORTHCOM) and support activities for U.S. Space Force. The major component of this Subactivity Group is comprised of Space Domain Awareness Operations, a worldwide Space Surveillance Network of electro-optical and radar sensors. These provide space object cataloging and identification, resident space object maneuver detection, notification of satellite flyover, space treaty monitoring, scientific and technical intelligence gathering. 59 Exhibit OP-5, Subactivity Group 13C === page 64 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) II. Force Structure Summary Space Operations facilities and equipment include two control nodes, 16 antennas located at eight remote tracking stations (includes pre-launch support site), and two transportable ground systems (currently supporting operations) for emergency or spacecraft check-out missions. Other space operations in this Subactivity Group consist of the Space Surveillance Network (SSN), Counterspace Program, and the Space Test and Training Range (STTR). SSN is a worldwide system of dedicated optical and radar sensors along with additional contributing and collateral sensors and associated processing facilities. The Counterspace Program includes Offensive Counterspace (OCS) and Defensive Counterspace (DCS) that provide capabilities to allow friendly forces to exploit space capabilities while negating and preventing an adversary's ability to do the same. The STTR is maintained to safely and securely conduct training, testing and experimentation of counterspace capabilities. Additionally, four dedicated Global Positioning System (GPS) ground antennas support Command and Control and six dedicated GPS monitor stations passively track the GPS constellation, all reporting to two control stations. 60 Exhibit OP-5, Subactivity Group 13C === page 65 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements SPACE OPERATIONS SUBACTIVITY GROUP TOTAL FY 2025 Actuals $915,123 $915,123 Budget Request $983,784 $983,784 61 Amount $-111,537 $-111,537 Percent -11.34% -11.34% Appn $872,247 $872,247 Normalized Current Enacted $872,247 $872,247 FY 2027 Request $1,266,939 $1,266,939 Exhibit OP-5, Subactivity Group 13C === page 66 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $983,784 -110,500 -1,000 0 -37 872,247 0 0 0 872,247 0 0 0 $872,247 $872,247 62 15,383 32,286 347,023 $1,266,939 Exhibit OP-5, Subactivity Group 13C === page 67 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $983,784 1. Congressional Adjustments ................................................................................................................................................................................................................ $-111,537 a) Distributed Adjustments ................................................................................................................................................................................................. $-110,500 1) P.L. 119-75 - Space Force Requested Transfer to RDTE ..................................................................................................................... $-72,500 2) Unjustified Growth .................................................................................................................................................................................. $-38,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-1,000 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,000 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions .................................................................................................................................................................................................................. $-37 1) Bulk Fuels ..................................................................................................................................................................................................... $-37 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $872,247 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 63 Exhibit OP-5, Subactivity Group 13C === page 68 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $872,247 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $872,247 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $872,247 6. Price Change ..........................................................................................................................................................................................................................................$15,383 7. Transfers .................................................................................................................................................................................................................................................$32,286 a) Transfers In ....................................................................................................................................................................................................................... $43,946 64 Exhibit OP-5, Subactivity Group 13C === page 69 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 1) Civilian Pay - Command and Control Manpower .................................................................................................................................... $21,457 Increase transfers funding and manpower to Space Operations (Subactivity Group 13C, +$21,457, 103 FTEs) from Global C3I & Early Warning (Subactivity Group 12A, -$1,759, -17 FTEs), Special Programs (Subactivity Group 13F, $10,919, 54 FTEs), Logistics Operations (Subactivity Group 41A, -$960, -10 FTEs) and Administration (Subactivity Group 42A, -$3,970, -27 FTEs) to realign resources to support the mission requirements for the standup of U.S. Space Force - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $166,717; FTE Base: 871; 103 FTE) 2) Civilian Pay - Sustainment Manpower .................................................................................................................................................... $15,907 Increase transfers funding and manpower to Space Operations (Subactivity Group 13C, +$15,907, 92 FTEs) and Global C3I & Early Warning (Subactivity Group 12A, +$9,270, 56 FTEs) from U.S. Space Force Research, Development, Test and Evaluation (RDT&E) in an effort to unify all elements of readiness to aid in the advancement of the Space Force mission. OP32: 101 Executive General Schedule (FY 2026 Base: $166,717; FTE Base: 871; 92 FTE) 3) Realign Special Access Program Management Office Operational Funding ........................................................................................... $5,054 Increase realigns funding to Space Operations (Subactivity Group 13C +$5,054) from Research, Development, Test and Evaluation, U.S. Space Force (-$2,829) and Other Procurement, U.S. Space Force (-$2,225) to consolidate special access program management office funding for proper execution. The management and oversight responsibilities of this program office are to be funded by unclassified Operation and Maintenance funding per regulatory guidance. OP32: 932 Management and Professional (FY 2026 Base: $161,722) 65 Exhibit OP-5, Subactivity Group 13C === page 70 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 4) Civilian Pay - National Space Intelligence Center Manpower .................................................................................................................. $1,528 Increase transfers funding and manpower to Space Operations (Subactivity Group 13C, +1,528, 18 FTEs) and Global C3I & Early Warning (Subactivity Group 12A, $572, 6 FTEs) from Administration (Subactivity Group 42A, -$2,666, 24 FTEs). This transfer realigns manpower to meet USSF security requirements to support National Space Intelligence Center (NSIC). NSIC is one of the primary sources of intel within the USSF, utilized to accurately target, track and assess foreign space capabilities and emerging threats across the space domain. OP32: 101 Executive General Schedule (FY 2026 Base: $166,717; FTE Base: 581; 18 FTE) b) Transfers Out ................................................................................................................................................................................................................... $-11,660 1) National Space Intelligence Center (NSIC) ........................................................................................................................................... $-11,660 Decrease transfers funding from Space Operations (Subactivity Group 13C -$11,660) to Special Programs (Subactivity Group 13F +$11,660) to realign the NSIC funding to the correct Subactivty group it executes in. OP32: 922 Equipment Maintenance 925 Equipment Purchases 927 Air Defense Contracts Space 934 Engineering and Technical (FY 2026 Base: $37,659) 8. Program Increases .............................................................................................................................................................................................................................. $368,617 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $368,617 66 Exhibit OP-5, Subactivity Group 13C === page 71 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 1) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ..................................................................................... $1,188 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $166,717; FTE Base: 871) 2) Intelligence, Surveillance and Reconnaissance (ISR) Support Activities - Fund Targeting, Modeling and Simulation ........................... $6,264 Increase funding for Space Superiority ISR to support Combatant Commands, the U.S. Space Force, and other stakeholders. This aligns with the National Defense Strategy by enhancing space warfighting capabilities, advancing physics-based modeling and simulations, and improving targeting and operational planning. It enables commanders to assess risks and make informed decisions in a contested space environment. OP32: 308 Travel of Persons 914 Purchased Communications 915 Rents (Non-GSA) 922 Equipment Maintenance 925 Equipment Purchases 934 Engineering and Technical (FY 2026 Base: $37,659) 3) Position Navigation and Timing - Classified ........................................................................................................................................... $79,600 Increase to a classified program. Details will be provided under separate cover with the classified Operation and Maintenance justification material. OP32: 927 Air Defense Contracts & Space Support (AF) 67 Exhibit OP-5, Subactivity Group 13C === page 72 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 4) Position, Navigation, and Timing - Global Positioning System Operational Control System Sustainment ............................................ $90,070 Increase funds transition and sustainment for Space Based Environment (SBE). SBE monitors crucial environmental data to support military operations. The data, which includes atmospheric, ocean, and space weather information, is essential for mission planning and execution by joint warfighters, ensuring they maintain a critical informational advantage. This will also ensure 24/7 operations through a modernized satellite Command and Control (C2) system, which replaces the current ground control system for legacy and new global positioning GPS satellites. This increase addresses the heightened operational demand by enhancing core capabilities to bolster the Department's joint combat force's warrior lethality in space operations expanding global presence and power projection to defend Homeland and deter external threats. OP32: 927 Air Defense Contracts Space Support (FY 2026 Base: $98,219) 5) Satellite Control Network ........................................................................................................................................................................ $27,746 Program increase for the Satellite Control Network (SCN) is required to modernize infrastructure and enhance cybersecurity defenses in response to evolving threats to space assets. The SCN provides critical command and control capabilities for a wide range of U.S. military and government satellites, ensuring their operational effectiveness and data integrity. The increased funding will support the replacement of aging hardware, the implementation of advanced cybersecurity protocols, and the expansion of network capacity to accommodate the growing number of satellites under its control. This investment demonstrates a commitment to maintaining the resilience and security of the SCN, vital for ensuring continued access to space-based capabilities. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) 957 Land and Structures (FY 2026 Base: $96,073) 68 Exhibit OP-5, Subactivity Group 13C === page 73 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 6) Space Command and Control - Assemble Integrated Operation Network Pathfinder (iONPath) ............................................................ $7,704 Increase funds Pathfinder program to transition from service-owned information technology mission infrastructure to a hybrid agnostic transport and data interoperability in order to deliver software-defined mission architecture based on mission needs. It fulfills data transport requirements of modern space operations, as validated in the Defense Intelligence Security Enterprise Strategic Requirements Document enabling the Battle Management, Command, Control and Communications warfighter missions, specifically kill chain closure, to meet tactical mission timeline requirements. Moreover, this secure, reliable, multi-classification transport layer is designed to avoid initial system technical debt. OP32: 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $52,200) 7) Space Superiority - Space Control.......................................................................................................................................................... $94,329 Program increase to bolster several elements of the Space Control portfolio to increase data storage space. The Universal Data Library (UDL) that supports Sensitive Compartmented Information (SCI) and Special Access Programs (SAP) is currently at capacity and additional space will be supported. Additionally, increase supports battlespace awareness programs which are paramount to maintaining space superiority. These programs include Counterspace Operations Requirements and Plans, the Space Fence and associated orbital tracking processes, and Intelligence Surveillance and Reconnaissance support regarding threat analysis and targeting. OP32: 920 Supplies & Materials (Non-Fund) 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) 957 Land and Structures (FY 2026 Base: $557,280) 69 Exhibit OP-5, Subactivity Group 13C === page 74 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 8) Space Superiority - Space Support......................................................................................................................................................... $37,244 Increase provides funding for Space Force organic cyber defense teams and aggressor units at Delta 12 to support exercises and wargames as well as to develop tactics, techniques, and procedures. The U.S. Space Force space test enterprise vision mandated STARCOM to expand integrated test activities covering developmental, operational, and integrated testing. This funding is critical to our homeland defense posture that Delta 15 provides through defensive cyber operations. OP32: 308 Travel of Persons 915 Rents (Non-GSA) 920 Supplies & Materials (Non-Fund) 922 Equipment Maintenance by Contract 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $244,191) 9) Space Support Funding .......................................................................................................................................................................... $24,472 Funding increase to support efforts in cyber security, supply chain risk mitigation, and zero trust architectures. These improvements harden U.S. Space Force systems against external threats. OP32: 932 Management & Professional Support Services 934 Engineering & Technical Services (FY 2026 Base: $244,191) 9. Program Decreases .............................................................................................................................................................................................................................. $-21,594 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ....................................................................................................................................................................................... $-21,594 70 Exhibit OP-5, Subactivity Group 13C === page 75 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) 1) Civilian Pay - Average Workyear Cost Adjustment................................................................................................................................ $-21,594 Decrease in Civilian Personnel compensation adjusts average workyear costs. Each year U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these changes as well as updated pay raise, awards and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $166,717; FTE Base: 871) FY 2027 Budget Request.................................................................................................................................................................................................................... $1,266,939 71 Exhibit OP-5, Subactivity Group 13C === page 76 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) IV. Performance Criteria and Evaluation Summary Satellite Control Network (SCN) Satellite Contacts Daily (Projected Average) Annual (Projected) Network Support Hours FY 2025 458 167,112 79,500 FY 2026 490 180,000 83,000 FY 2027 505 186,000 85,500 Defense Meteorological Satellite Program Primary Satellites in Orbit Secondary Satellites in Orbit 2 1 2 1 2 1 Global Positioning System Primary Satellites in Orbit 31 31 31 Space Domain Awareness Operations Dedicated Sensors Contributing Sensors Primary Satellites in Orbit 14 14 6 16 18 11 17 18 13 Counterspace Defensive Offensive 8 14 8 16 8 23 Electro-Optical/Infrared Weather System - Geostationary Primary Satellites in Orbit Secondary Satellites in Orbit 1 0 1 1 1 1 Weather Satellite Follow - Microwave Primary Satellite in Orbit 1 2 2 72 Exhibit OP-5, Subactivity Group 13C === page 77 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 2,899 1,542 1,357 3,052 1,623 1,429 3,290 1,434 1,856 238 -189 427 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 1,194 1,194 1,194 0 1,194 0 871 871 871 0 871 0 1,084 1,084 1,084 0 1,084 0 213 213 213 0 213 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 162 0 0 191 0 0 171 0 0 -21 2,984 3,098 4,581 1,483 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 73 Exhibit OP-5, Subactivity Group 13C === page 78 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 185,321 0 1.28% 2,372 -21,205 166,488 0 0.28% 466 18,015 184,969 6,799 0 1.28% 87 -6,886 0 0 0.28% 0 0 0 0 0 2.90% 0 229 229 0 2.10% 5 0 234 2.90% 2.10% CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 103 WAGE BOARD 110 UNEMPLOYMENT COMPENSATION 121 PCS BENEFITS 1,562 0 193,682 0 TRAVEL OF PERSONS 19,519 -1 TOTAL TRAVEL 19,519 -1 TOTAL CIVILIAN PERSONNEL COMPENSATION 45 -1,607 0 0 2,504 -29,469 166,717 0 488 -6,791 13,215 -1 488 -6,791 13,215 -1 0 0 0 471 18,015 185,203 277 3,952 17,443 277 3,952 17,443 TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 DLA ENERGY (FUEL PRODUCTS) 348 0 1.10% 4 -231 121 0 -7.08% -9 54 166 414 AIR FORCE CONSOLIDATED SUSTAINMENT AG (SUPPLY) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 2,827 0 5.78% 163 489 3,479 0 4.54% 158 -62 3,575 3,480 0 5.79% 201 -1,718 1,963 0 0.61% TOTAL DWCF SUPPLIES AND MATERIALS 6,655 0 369 -1,461 5,563 0 AIR FORCE FUND EQUIPMENT 153 0 4 -157 0 0 TOTAL DWCF EQUIPMENT PURCHASES 153 0 4 -157 0 0 0 0 0.02% 0 90 90 0 3.30% -8.00% 0.00% 418 12 30 2,005 161 22 5,746 0 0 0 0 0 0 3 -14 79 DWCF EQUIPMENT PURCHASES 505 2.50% 2.10% OTHER FUND PURCHASES 633 671 DLA DOCUMENT SERVICES DISN INFRASTRUCTURE SERVICES (DISN-IS) 1,227 0 TOTAL OTHER FUND PURCHASES 1,227 0 100 0 -98 4,607 5,736 0 -98 4,697 5,826 0 18 -118 0 0 0 160 5,896 3 146 5,975 0 0 0 TRANSPORTATION 703 JCS EXERCISES 17.50% 74 -19.64% Exhibit OP-5, Subactivity Group 13C === page 79 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 3,010 0 74.80% 2,251 -5,261 0 0 -1.99% 0 3,577 3,577 0 705 AMC CHANNEL CARGO 706 AMC CHANNEL PASSENGER 0 0 86.40% 0 0 0 0 -47.20% 0 0 708 MSC CHARTERED CARGO 20 0 2.50% 1 -21 0 0 2.10% 0 0 0 771 COMMERCIAL TRANSPORTATION 1,728 0 2.50% 43 -1,479 292 0 2.10% 6 2 300 TOTAL TRANSPORTATION 4,858 0 2,313 -6,879 292 0 6 3,579 3,877 OTHER PURCHASES 913 PURCHASED UTILITIES (NON-FUND) 20 0 2.50% 1 -5 16 0 2.10% 0 0 16 914 PURCHASED COMMUNICATIONS (NON-FUND) 9,189 0 2.50% 230 -704 8,715 0 2.10% 183 -908 7,990 915 RENTS (NON-GSA) 3,017 0 2.50% 75 10,026 13,118 0 2.10% 275 807 14,200 917 POSTAL SERVICES (U.S.P.S) 0 0 2.50% 0 254 254 0 2.10% 5 -3 256 920 SUPPLIES & MATERIALS (NON-FUND) 13,911 0 2.50% 348 4,644 18,903 0 2.10% 397 11,463 30,763 921 PRINTING & REPRODUCTION 468 0 2.50% 12 -399 81 0 2.10% 2 -9 74 922 EQUIPMENT MAINTENANCE BY CONTRACT 42,214 0 2.50% 1,055 -31,801 11,468 0 2.10% 241 5,482 17,191 923 OPERATION AND MAINTENANCE OF FACILITIES 14,133 0 2.50% 353 -14,377 109 3 2.10% 2 24 138 925 EQUIPMENT PURCHASES (NON-FUND) 31,878 0 2.50% 797 -16,222 16,453 0 2.10% 346 52,434 69,233 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 350,608 63 2.50% 8,767 168,368 527,806 128 2.10% 11,087 239,718 778,739 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 106,266 0 2.50% 2,657 -58,355 50,568 0 2.10% 1,062 40,927 92,557 933 STUDIES, ANALYSIS, & EVALUATIONS 18,143 0 2.50% 454 -11,477 7,120 0 2.10% 150 -23 7,247 934 51,126 0 2.50% 1,278 -46,426 5,978 0 2.10% 126 -2,669 3,435 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 1,311 0 2.50% 33 -997 347 0 2.10% 7 -46 308 955 MEDICAL CARE 0 0 4.00% 0 46 46 0 3.90% 2 -1 47 957 LAND AND STRUCTURES 11,380 0 2.50% 285 -8,875 2,790 0 2.10% 59 6,540 9,389 959 INSURANCE CLAIMS AND INDEMNITIES 4,075 0 2.50% 102 -4,177 0 0 2.10% 0 0 0 960 INTEREST AND DIVIDENDS 0 0 2.50% 0 0 0 0 2.10% 0 0 0 964 SUBSISTENCE AND SUPPORT OF PERSONS 0 0 2.50% 0 0 0 0 2.10% 0 0 0 985 RESEARCH AND DEVELOPMENT CONTRACTS 5,019 0 2.50% 125 -5,144 0 0 2.10% 0 0 0 987 OTHER INTRA-GOVERNMENT PURCHASES 18,420 0 2.50% 461 -18,272 609 2 2.10% 13 -8 616 989 OTHER SERVICES 7,851 -2 2.50% 2.10% 689,029 61 TOTAL OTHER PURCHASES 75 196 8,208 16,253 34 17,227 -25,683 680,634 167 342 -133 16,496 14,298 353,596 1,048,695 Exhibit OP-5, Subactivity Group 13C === page 80 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Space Operations ($ In Thousands) GRAND TOTAL FY 2025 Program FC Rate Diff 915,123 60 Price Growth Percent 76 Price Growth Program Growth FY 2026 Program FC Rate Diff 22,807 -65,743 872,247 166 Price Growth Percent Price Growth Program Growth FY 2027 Program 15,217 379,309 1,266,939 Exhibit OP-5, Subactivity Group 13C === page 81 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) I. Description of Operations Financed Defensive Cyberspace Operations-Space (DCO-S) provide defensive cyber capabilities that protect U.S. Space Force’s computer systems, software applications, and sensitive operational information against unauthorized intrusion, corruption, and destruction. The focus of Cyberspace Activities is directed towards defensive cyberspace capabilities, computer and network systems security, damage assessment and recovery, cyber threats (recognition, attribution, and mitigation), and active methodologies in response to evolving threats and changes in the cyber environment. The areas of emphasis are proactive defense, defensive counter cyberspace, cyberspace intelligence, surveillance and reconnaissance, command and control situational awareness, persistent network operations, as well as decision support, recovery, and digital forensics. II. Force Structure Summary The unique attributes of cyberspace activities require trained and ready forces to detect, deter, and respond to threats in cyberspace. Defensive Cyberspace OperationsSpace enables mission Deltas to perform cyber integrated space operations that identify, detect, protect against, respond to, and recover from malicious threats to space mission systems. These developments deploy cyber defense tool suites for the ground mission systems to protect the following mission sets: protected communications, missile warning, Military Strategic Communications (MILSATCOM), Position Navigation and Timing (PNT), ballistic missile command and control, Space Domain Awareness (SDA), Nuclear Command Control and Communications (NC3), and command and control satellite operations. 77 Exhibit OP-5, Subactivity Group 13D === page 82 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements CYBERSPACE ACTIVITIES SUBACTIVITY GROUP TOTAL FY 2025 Actuals $123,030 $123,030 Budget Request $141,512 $141,512 78 Amount $-6,000 $-6,000 Percent -4.24% -4.24% Appn $135,512 $135,512 Normalized Current Enacted $135,512 $135,512 FY 2027 Request $289,958 $289,958 Exhibit OP-5, Subactivity Group 13D === page 83 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $141,512 -5,000 -1,000 0 0 135,512 0 0 0 135,512 0 0 0 $135,512 $135,512 79 2,834 8,261 143,351 $289,958 Exhibit OP-5, Subactivity Group 13D === page 84 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $141,512 1. Congressional Adjustments .................................................................................................................................................................................................................... $-6,000 a) Distributed Adjustments ..................................................................................................................................................................................................... $-5,000 1) Unjustified Growth .................................................................................................................................................................................... $-5,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-1,000 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,000 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $135,512 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 80 Exhibit OP-5, Subactivity Group 13D === page 85 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $135,512 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $135,512 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $135,512 6. Price Change ............................................................................................................................................................................................................................................$2,834 7. Transfers ...................................................................................................................................................................................................................................................$8,261 a) Transfers In ......................................................................................................................................................................................................................... $8,261 81 Exhibit OP-5, Subactivity Group 13D === page 86 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) 1) Civilian Pay - Command and Control Manpower ...................................................................................................................................... $8,261 Increase transfers funding and manpower to Cyberspace Activities (Subactivity Group 13D, $8,261, 45 FTEs) and Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) from Global C3I & Early Warning (Subactivity Group 12A -$1,759, 17 FTEs), Education & Training (Subactivity Group 13E, -$9,320, 52 FTEs), Special Programs (Subactivity Group 13F, -$10,919, 54 FTEs), Logistics Operations (Subactivity Group 41A, -$954, 5 FTEs) and Administration (Subactivity Group 42A, -$4,978, 27 FTEs) to realign resources to support the mission requirements for the standup of U.S. Space Force - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $0; 45 FTE) b) Transfers Out ............................................................................................................................................................................................................................. $0 8. Program Increases .............................................................................................................................................................................................................................. $143,418 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $143,418 82 Exhibit OP-5, Subactivity Group 13D === page 87 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) 1) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees .......................................................................................... $65 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $0; FTE Base: 0) 2) Space Command and Control - Defensive Cyber Operations-Space (DCO-S) ................................................................................... $143,353 Increase funds fielding of DCO-S weapons systems supporting military satellite communications, missile warning/tracking, and resilient cyber operations centers. It provides mission-specific DCO-S modifications for primary and secondary cyber squadron locations, including equipment, trainers, contract support, and sustainment. The funding distributes the U.S. Space Force cyber footprint while enhancing capability, C2, training, and exercise support. It fields a Big Data Platform across three security enclaves (SIPRNET, SCI, SAP) and mission communications, provides technical mission analysis, software licenses, and enables cloud computing transition for production and program management. This accelerates DCO capability deployment from 15 to ~30 space systems components annually in FY27. This investment supports the U.S. Space Force's investment in resilient operations, critical to combat the increasingly contested and competitive space domain. OP32: 925 – Equipment Purchases (Non-Fund) 927 – Integration and Sustainment Contracts 957 – Land and Structures (FY 2026 Base: $136,512) 9. Program Decreases ..................................................................................................................................................................................................................................... $-67 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 83 Exhibit OP-5, Subactivity Group 13D === page 88 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) c) Program Decreases in FY 2027 .............................................................................................................................................................................................. $-67 1) Civilian Pay - Average Workyear Cost Adjustment....................................................................................................................................... $-67 Decrease in Civilian Personnel compensation adjusts average workyear costs. Each year U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these changes as well as updated pay raise, awards and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $0; FTE Base: 0) FY 2027 Budget Request....................................................................................................................................................................................................................... $289,958 84 Exhibit OP-5, Subactivity Group 13D === page 89 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) Cyberspace Activities Major Commodity Cyberspace Activities Total FY 2025 Actuals 118,210.0 118,210.0 Price Change 2,955.0 2,955.0 85 Program Change 14,347.0 14,347.0 FY 2026 Enacted 135,512.0 135,512.0 Price Change 2,834.0 2,834.0 Program Change FY 2027 Request 151,612.0 151,612.0 289,958.0 289,958.0 Exhibit OP-5, Subactivity Group 13D === page 90 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 0 0 0 0 0 0 0 0 0 0 0 0 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 26 26 26 0 26 0 0 0 0 0 0 0 45 45 45 0 45 0 45 45 45 0 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost 0 0 185 0 0 0 0 0 184 0 0 184 Contractor FTEs (Total) 250 333 736 403 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 86 Exhibit OP-5, Subactivity Group 13D === page 91 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 4,820 0 1.28% 62 -4,882 0 0 0.28% 0 8,259 8,259 TOTAL CIVILIAN PERSONNEL COMPENSATION 4,820 0 62 -4,882 0 0 0 8,259 8,259 TRAVEL OF PERSONS 2,357 0 59 1,913 4,329 0 91 -135 4,285 TOTAL TRAVEL 2,357 0 59 1,913 4,329 0 91 -135 4,285 DISN INFRASTRUCTURE SERVICES (DISN-IS) 0 0 0 546 546 0 0 16 562 TOTAL OTHER FUND PURCHASES 0 0 0 546 546 0 0 16 562 COMMERCIAL TRANSPORTATION 15 0 0 -15 0 0 0 0 0 TOTAL TRANSPORTATION 15 0 0 -15 0 0 0 0 0 60,650 0 2.50% 1,516 -4,235 57,931 0 2.10% 1,217 8,623 67,771 854 0 2.50% 21 -173 702 0 2.10% 15 2 719 CIVILIAN PERSONNEL COMPENSATION 101 TRAVEL 308 2.50% 2.10% OTHER FUND PURCHASES 671 -8.00% 0.00% TRANSPORTATION 771 2.50% 2.10% OTHER PURCHASES 914 PURCHASED COMMUNICATIONS (NON-FUND) 920 SUPPLIES & MATERIALS (NON-FUND) 922 EQUIPMENT MAINTENANCE BY CONTRACT 2,875 0 2.50% 72 1,056 4,003 0 2.10% 84 20 4,107 925 EQUIPMENT PURCHASES (NON-FUND) 3,710 0 2.50% 93 1,555 5,358 0 2.10% 113 26,066 31,537 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 42,292 0 2.50% 1,057 7,280 50,629 0 2.10% 1,063 -21,512 30,180 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 1,543 0 2.50% 39 -1,582 0 0 2.10% 0 0 0 933 STUDIES, ANALYSIS, & EVALUATIONS 934 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 957 LAND AND STRUCTURES 985 RESEARCH AND DEVELOPMENT CONTRACTS 0 0 2.50% 0 4,649 4,649 0 2.10% 98 -2,642 2,105 1,580 0 2.50% 40 -1,620 0 0 2.10% 0 0 0 14 0 2.50% 0 7,351 7,365 0 2.10% 155 43 7,563 467 0 2.50% 12 -479 0 0 2.10% 0 29,600 29,600 0 0 2.50% 0 0 0 0 2.10% 0 103,270 103,270 87 Exhibit OP-5, Subactivity Group 13D === page 92 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Cyberspace Activities ($ In Thousands) 987 OTHER INTRA-GOVERNMENT PURCHASES 989 OTHER SERVICES FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 183 0 2.50% 5 -188 0 0 2.10% 0 0 0 2.50% 2.10% 1,670 0 42 -1,712 0 0 0 0 0 TOTAL OTHER PURCHASES 115,838 0 2,896 11,903 130,637 0 2,743 143,472 276,852 GRAND TOTAL 123,030 0 3,017 9,465 135,512 0 2,834 151,612 289,958 88 Exhibit OP-5, Subactivity Group 13D === page 93 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) I. Description of Operations Financed Space Training involves the acquisition of knowledge with the intent of developing specific job-related skill sets enabling Guardians to perform job-related tasks effectively. For enlisted personnel, training begins with Basic Military Training (BMT) which introduces U.S. Space Force (USSF) recruits to their military profession as Guardians. Guardians attend Initial Skills Training (IST) to instill the baseline technical skills required for space warfighting. Space Education consists of learning theory and principles related to joint warfighting, a Guardian's profession, and the space warfighting domain. The U.S. Space Force provides developmental education through Officer and Enlisted Professional Military Education (OPME/EPME). The U.S. Space Force offers Intermediate Level Education (Schriever Space Scholars) and Senior Level Education (West Space Scholars) delivered in partnership with Johns Hopkins University. The Vosler Academy provides EPME for USSF enlisted. In addition, the National Security Space Institute (NSSI) provides space professional continuing education for the U.S. Space Force, U.S. Space Command, other services, and international partners. This Subactivity Group also funds the Enterprise Talent Management Office (ETMO), which supports USSF officer, enlisted, and civilian Guardian development, assignment and utilization. II. Force Structure Summary Training: Training begins with BMT at Lackland Air Force Base, Texas, with dedicated BMT Guardian flights. Delta 1-533d Training Squadron (533 TRS), Vandenberg Space Force Base, California, conducts Enlisted Undergraduate Space Training (EUST). The course provides Initial Skills Training (IST) to enlisted space operators. The course trains Guardians specifically regarding operations and activities associated with space fundamentals, space threats, orbital warfare, space electronic warfare, space battle management, space access and sustainment. The 533d also conducts the cyber combat course (C3) for cyber Guardians to provide foundational offensive and defensive cyberspace operations knowledge/skills. These space and cyber ISTs provide Guardians with fundamental knowledge and performance skills associated with operations, warfighting, and threats. The USSF leverages the USAF for enlisted cyber and intel IST with the USSF providing a space fundamentals top-off course that covers pertinent topics for each career field. Delta 1-319th Combat Training Squadron (319 CTS), Peterson Space Force Base, Colorado, conducts the Officer Training Course (OTC). OTC is a Chief of Space Operations (CSO) directed effort to consolidate USSF officer initial skills training. The course provides a foundation for all USSF officers to be effective in their future assignments and provides a breadth of experience in all space mission sets. The course merges IST in the USSF’s core specialties of space, intelligence, cyber, and force modernization for new officer accessions to develop a shared multi-domain, joint warfighter mindset and culture. Education: This Subactivity Group funds USSF OPME and EPME. Delta 13 has partnered with Johns Hopkins University to deliver officer Intermediate Level Education (ILE) and Senior Level Education (SLE) to Guardians, other Services, and partners. For EPME, the Vosler Academy at Peterson Space Force Base, Colorado, provides all three tiers of EPME for U.S. Space Force Specialist-4s through Senior Master Sergeants. 89 Exhibit OP-5, Subactivity Group 13E === page 94 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) This Subactivity Group also funds Delta 13-National Security Space Institute (NSSI), Colorado Springs, Colorado. The NSSI conducts courses that broaden knowledge to design, develop, acquire, operate, employ and support national security space capabilities more effectively. The courses meet the evolving education requirements of the USSF and U.S. Space Command. Through continual professional development, these courses provide cutting edge education to U.S. and allied personnel. 90 Exhibit OP-5, Subactivity Group 13E === page 95 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements EDUCATION AND TRAINING SUBACTIVITY GROUP TOTAL FY 2025 Actuals $217,046 $217,046 Budget Request $302,939 $302,939 91 Amount $-16,714 $-16,714 Percent -5.52% -5.52% Appn $286,225 $286,225 Normalized Current Enacted $286,225 $286,225 FY 2027 Request $783,168 $783,168 Exhibit OP-5, Subactivity Group 13E === page 96 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $302,939 -15,000 -1,714 0 0 286,225 0 0 0 286,225 0 0 0 $286,225 $286,225 92 5,544 -35,136 526,535 $783,168 Exhibit OP-5, Subactivity Group 13E === page 97 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $302,939 1. Congressional Adjustments .................................................................................................................................................................................................................. $-16,714 a) Distributed Adjustments ................................................................................................................................................................................................... $-15,000 1) Unjustified Growth .................................................................................................................................................................................. $-15,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-1,714 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,000 2) Program Decrease - Projected Overestimation of Civilian Compensation ................................................................................................. $-714 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $286,225 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 93 Exhibit OP-5, Subactivity Group 13E === page 98 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $286,225 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $286,225 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $286,225 6. Price Change ............................................................................................................................................................................................................................................$5,544 7. Transfers ............................................................................................................................................................................................................................................... $-35,136 a) Transfers In ......................................................................................................................................................................................................................... $7,000 94 Exhibit OP-5, Subactivity Group 13E === page 99 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 1) Space Support - Wargaming..................................................................................................................................................................... $7,000 Increase reflects realignment to Education and Training (Subactivity Group 13E, +$7,000) from Research, Development, Testing, and Evaluation, U.S. Space Force (-$7,000) to realign the U.S. Space Force's Delta 10 Wargaming funding for proper execution across the enterprise. OP32: 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $9,267) b) Transfers Out ................................................................................................................................................................................................................... $-42,136 1) Operational Test and Training Infrastructure ......................................................................................................................................... $-32,816 Decrease transfers funds from Education and Training (Subactivity Group 13E -$32,816) to Special Programs (Subactivity Group 13F +$32,816) to realign the U.S. Space Force's consolidated Operational Test and Training Infrastructure funding for proper execution. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $43,006) 95 Exhibit OP-5, Subactivity Group 13E === page 100 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 2) Civilian Pay - Command and Control Manpower ..................................................................................................................................... $-9,320 Decrease transfers funding and manpower from Education & Training (Subactivity Group 13E, -$9,320, -52 FTEs), Global C3I & Early Warning (Subactivity Group 12A -$1,759, -17 FTEs), Special Programs (Subactivity Group 13F, -$10,919, -54 FTEs), Logistics Operations (Subactivity Group 41A, -$470, -5 FTEs) and Administration (Subactivity Group 42A, -$4,978, -27 FTEs) to Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) and Cyberspace Activities (Subactivity Group 13D, $8,261, 45 FTEs) to realign resources to support the mission requirements for the standup of U.S. Space Force - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178; -52 FTE) 8. Program Increases .............................................................................................................................................................................................................................. $526,535 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $526,535 1) Civilian Pay - Average Workyear Cost Adjustment................................................................................................................................... $6,139 Increase in Civilian Personnel compensation adjusts average workyear costs. Each year U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these changes as well as updated pay raise, awards and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178) 96 Exhibit OP-5, Subactivity Group 13E === page 101 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 2) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ........................................................................................ $175 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178) 3) Civilian Pay - Guardian Development .......................................................................................................................................................... $612 Increase funding and manpower (7 FTEs) to support U.S. Space Force education requirements through the Guardian education ecosystem. The program aims to hone knowledge, promote readiness, and lethality among Guardians. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178; 7 FTE) 4) Civilian Pay - Inter-Service Transfer Manpower ....................................................................................................................................... $2,782 Increased funding and manpower (11 FTEs) to provide qualified civilian instructors for both officer and enlisted inter-service transfer (IST) Guardians. Instructors are essential to developing warfighting-ready personnel, reduce training bottlenecks created by rising accession rates, and ensuring members become mission qualified through advanced training exercises and operation skill development. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178; 11 FTE) 97 Exhibit OP-5, Subactivity Group 13E === page 102 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 5) Civilian Pay - Workforce Modernization .................................................................................................................................................... $1,670 Increase funding and manpower (20 FTEs) reflects the alignment of civilian staffing to validated mission requirements pursuant to Executive Order 14210, implementing the President’s Department of Government Efficiency Workforce Optimization Initiative and the March 2025 Deputy Secretary of War memorandum. The Air Force conducted comprehensive data-hygiene and manpower-validation efforts, resulting in a correction where FY2026 staffing levels were set below the Airlift Operations Program established requirements. The FY2027 request reflects the full requirement necessary to support mission execution and workforce modernization. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178; 20 FTE) 6) Civlian Pay - Exercise Support .................................................................................................................................................................... $268 Increase funding and manpower (3 FTEs) to fund support of realistic, threat-informed training, secure equipment and additional facility needs to meet current and emerging U.S. Space Force exercise requirements. Enables the U.S. Space Force to fully support current and emerging requirements as prescribed in the annual Service Exercise Plan (SEP), joint & coalition partners. OP32: 101 Executive General Schedule (FY 2026 Base: $25,535; FTE Base: 178; 3 FTE) 98 Exhibit OP-5, Subactivity Group 13E === page 103 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 7) U.S. Space Force Exercises ................................................................................................................................................................. $514,889 Increase funds realistic, threat-informed training, range, and aggressor support, additional facility needs and equipment to meet current and emerging U.S. Space Force exercise requirements. Enables U.S. Space Force to fully support current and emerging requirements as prescribed in the annual Service Exercise Plan (SEP), joint & coalition partners. The funds deliver Space Force Generation (SPAFORGEN) exercise requirements by providing exercise planners/facilitators, range control operators, aggressors, and Special Access Program (SAP)/Top Secret (TS)/Sensitive Compartmentalized Information (SCI) facilities and equipment. The SPAFORGEN model has three phases: "prepare", "ready", and "commit". The "prepare" phase involves advanced training and professional development, including specialized testing and instruction. This phase culminates in a "FLASHPOINT" exercise to test mission planning and tactics. The "ready" phase focuses on building readiness through large-scale exercises to include Space Flag, Polaris Hammer, and the Skies Series. The final "commit" phase involves employing forces to achieve space superiority. OP32: 308 Travel of Persons 915 Rents (Non-GSA) 920 Supplies & Materials 925 Equipment Purchases 927 Air Defense Contracts Space (FY 2026 Base: $93,402) 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 FY 2027 Budget Request....................................................................................................................................................................................................................... $783,168 99 Exhibit OP-5, Subactivity Group 13E === page 104 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) IV. Performance Criteria and Evaluation Summary FY 2025 Actuals 6 22 6 Student Output 1,050 1,050 480 Specialized Skills Training 319 CTS 0 United States Air Force Weapons School (328 WPS) Weapons Instructor Course Advanced Instructor Course Cyber Tacticians Course FY 2026 Enacted FY 2027 Request 6 22 6 Student Output 1,050 1,050 480 0 0 0 0 0 2 2 2 32 32 8 2 2 2 32 32 8 2 2 2 32 32 8 Professional Development Professional Military Education USSF ILE/SLE (John Hopkins University) Fellowships (Vosler) 2 11 70 584 2 25 82 912 2 31 82 1,678 Professional Continuing Education National Security Space Institute 219 5,996 234 6,360 281 7,145 Total 272 9,302 301 10,006 338 10,685 Recruit / General Skills Training Basic Military Training (BMT) Enlisted Initial Skills Training Officer Initial Skills Training Offerings 100 Offerings Offerings 6 6 6 Student Output 740 488 480 Exhibit OP-5, Subactivity Group 13E === page 105 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 1,657 667 990 1,777 967 810 1,848 935 913 71 -32 103 94 94 94 0 94 0 178 178 178 0 178 0 167 167 167 0 167 0 -11 -11 -11 0 -11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost 0 0 173 0 0 143 0 0 167 0 0 23 Contractor FTEs (Total) 752 978 3,275 2,297 Active Military End Strength (E/S) (Total) Officer Enlisted Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 101 Exhibit OP-5, Subactivity Group 13E === page 106 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 16,258 0 1.28% 208 9,065 25,531 0 0.28% 71 2,255 27,857 CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 103 WAGE BOARD 5 0 1.28% 0 -5 0 0 0.28% 0 0 0 110 UNEMPLOYMENT COMPENSATION 0 0 2.90% 0 4 4 0 2.10% 0 0 4 121 PCS BENEFITS 5 0 2.90% 0 -5 0 0 2.10% 0 0 0 16,268 0 208 9,059 25,535 0 72 2,254 27,861 TRAVEL OF PERSONS 12,031 0 301 2,961 15,293 0 321 16,186 31,800 TOTAL TRAVEL 12,031 0 301 2,961 15,293 0 321 16,186 31,800 DLA ENERGY (FUEL PRODUCTS) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 0 0 1.10% 0 0 0 0 -7.08% 0 0 0 0 0 5.79% 0 5 5 0 0.61% 0 0 5 TOTAL DWCF SUPPLIES AND MATERIALS 0 0 0 5 5 0 0 0 5 AIR FORCE FUND EQUIPMENT 1,148 0 29 -1,177 0 0 0 0 0 TOTAL DWCF EQUIPMENT PURCHASES 1,148 0 29 -1,177 0 0 0 0 0 TOTAL CIVILIAN PERSONNEL COMPENSATION TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 418 DWCF EQUIPMENT PURCHASES 505 2.50% 2.10% OTHER FUND PURCHASES 633 DLA DOCUMENT SERVICES 0 0 0.02% 0 0 0 0 3.30% 0 0 0 647 DISA ENTERPRISE COMPUTING CENTERS 22 0 2.00% 0 -22 0 0 -4.00% 0 0 0 671 DISN INFRASTRUCTURE SERVICES (DISN-IS) 0 0 -8.00% 0 0 0 0 0.00% 0 0 0 TOTAL OTHER FUND PURCHASES 22 0 0 -22 0 0 0 0 0 8 0 1 -9 0 0 0 0 0 TRANSPORTATION 703 JCS EXERCISES 17.50% 102 -19.64% Exhibit OP-5, Subactivity Group 13E === page 107 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Education and Training ($ In Thousands) 771 FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program COMMERCIAL TRANSPORTATION 23 0 2.50% 1 -24 0 0 2.10% 0 0 0 TOTAL TRANSPORTATION 31 0 2 -33 0 0 0 0 0 OTHER PURCHASES 913 PURCHASED UTILITIES (NON-FUND) 914 PURCHASED COMMUNICATIONS (NON-FUND) 915 RENTS (NON-GSA) 920 SUPPLIES & MATERIALS (NON-FUND) 921 PRINTING & REPRODUCTION 922 EQUIPMENT MAINTENANCE BY CONTRACT 923 OPERATION AND MAINTENANCE OF FACILITIES 925 EQUIPMENT PURCHASES (NON-FUND) 9 0 2.50% 0 -9 0 0 2.10% 0 0 0 3,830 0 2.50% 96 1,175 5,101 -2 2.10% 107 27 5,233 834 0 2.50% 21 18,517 19,372 0 2.10% 407 30,657 50,436 3,871 0 2.50% 97 -478 3,490 0 2.10% 73 1,719 5,282 12,473 0 2.50% 312 -12,784 1 0 2.10% 0 0 1 1,146 0 2.50% 29 -361 814 0 2.10% 17 3,258 4,089 27 0 2.50% 1 -28 0 0 2.10% 0 0 0 3,742 0 2.50% 94 5,601 9,437 0 2.10% 198 -2,094 7,541 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 95,630 0 2.50% 2,391 44,053 142,074 0 2.10% 2,984 447,783 592,841 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 13,005 0 2.50% 325 -10,611 2,719 0 2.10% 57 63 2,839 933 STUDIES, ANALYSIS, & EVALUATIONS 934 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 955 MEDICAL CARE 957 LAND AND STRUCTURES 964 SUBSISTENCE AND SUPPORT OF PERSONS 985 987 988 GRANTS, SUBSIDIES AND CONTRIBUTIONS 989 OTHER SERVICES 0 0 2.50% 0 1,074 1,074 0 2.10% 23 22 1,119 543 0 2.50% 14 -557 0 0 2.10% 0 0 0 34,048 0 2.50% 851 13,311 48,210 0 2.10% 1,012 4,024 53,246 220 0 4.00% 9 -229 0 0 3.90% 0 0 0 9,138 0 2.50% 228 3,048 12,414 0 2.10% 261 -12,675 0 0 0 2.50% 0 686 686 0 2.10% 14 18 718 RESEARCH AND DEVELOPMENT CONTRACTS 2,194 0 2.50% 55 -2,249 0 0 2.10% 0 0 0 OTHER INTRA-GOVERNMENT PURCHASES 2,556 0 2.50% 64 -2,620 0 0 2.10% 0 0 0 730 0 2.50% 18 -748 0 0 2.10% 0 0 0 3,550 0 2.50% 89 -3,639 0 0 2.10% 0 157 157 TOTAL OTHER PURCHASES 187,546 0 4,692 53,154 245,392 -2 5,153 472,959 723,502 GRAND TOTAL 217,046 0 5,232 63,947 286,225 -2 5,546 491,399 783,168 103 Exhibit OP-5, Subactivity Group 13E === page 108 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) I. Description of Operations Financed The description of operations financed under Special Programs is classified. Details will be provided under separate cover upon request. II. Force Structure Summary Special Programs force structure summary information is classified. Details will be provided under separate cover upon request. 104 Exhibit OP-5, Subactivity Group 13F === page 109 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements SPECIAL PROGRAMS SUBACTIVITY GROUP TOTAL FY 2025 Actuals $465,316 $465,316 Budget Request $641,519 $641,519 105 Amount $24,842 $24,842 Percent 3.87% 3.87% Appn $666,361 $666,361 Normalized Current Enacted $666,361 $666,361 FY 2027 Request $852,239 $852,239 Exhibit OP-5, Subactivity Group 13F === page 110 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $641,519 27,000 -2,158 0 0 666,361 0 0 0 666,361 0 0 0 $666,361 $666,361 12,121 37,187 136,570 $852,239 The FY 2026 spend plan amount for Special Programs includes $666,361 thousand of discretionary and $6,390 thousand of mandatory (reconciliation) for a total of $672,751 thousand. 106 Exhibit OP-5, Subactivity Group 13F === page 111 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $641,519 1. Congressional Adjustments ....................................................................................................................................................................................................................$24,842 a) Distributed Adjustments .................................................................................................................................................................................................... $27,000 1) Classified Adjustment ............................................................................................................................................................................. $27,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-2,158 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,600 2) Program Decrease - Projected Overestimation of Civilian Compensation ................................................................................................. $-558 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $666,361 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 107 Exhibit OP-5, Subactivity Group 13F === page 112 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $666,361 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $666,361 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $666,361 6. Price Change ..........................................................................................................................................................................................................................................$12,121 7. Transfers .................................................................................................................................................................................................................................................$37,187 a) Transfers In ....................................................................................................................................................................................................................... $50,226 108 Exhibit OP-5, Subactivity Group 13F === page 113 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 1) Operational Test & Training Infrastructure .............................................................................................................................................. $32,816 Increase transfers funds to Special Programs (Subactivity Group 13F +$32,816) from Education & Training (Subactivity Group 13E -$32,816) to realign the U.S. Space Force's consolidated Operational Test and Training Infrastructure funding for proper execution. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $0) 2) National Space Intelligence Center (NSIC) ............................................................................................................................................ $11,660 Increase reflects transfer to Special Programs (Subactivity Group 13F +$11,660) from Space Operations (Subactivity Group 13C $11,660) to realign the NSIC funding to the correct Subactivty group it executes in. OP32: 308 Travel of Persons 914 Purchased Communications (Non-Defense Working Capital Fund) 920 Supplies & Materials 922 Equipment Maintenance 925 Equipment Purchases 927 Air Defense Contracts Space 932 Management and Professional 934 Engineering and Technical (FY 2026 Base: $486,553) 109 Exhibit OP-5, Subactivity Group 13F === page 114 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 3) Strategic Coordination Cell ....................................................................................................................................................................... $5,750 Increase reflects transfer to Special Programs (Subactivity Group 13F +$5,750) from Research, Development, Testing, and Evaluation, U.S. Space Force, (-$5,750) to realign the U.S. Space Force's Strategic Coordination Cell funding for proper execution across the Special Programs enterprise. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $0) b) Transfers Out ................................................................................................................................................................................................................... $-13,039 1) Civilian Pay - Command and Control Manpower ................................................................................................................................... $-10,919 Decrease transfers funding and manpower from Special Programs (Subactivity Group 13F, -$10,919, 54 FTEs), Global C3I & Early Warning (Subactivity Group 12A -$1,759, -17 FTEs), Education & Training (Subactivity Group 13E, -$9,320, -52 FTEs), Logistics Operations (Subactivity Group 41A, -$470, -5 FTEs) and Administration (Subactivity Group 42A, -$4,978, -27 FTEs) to Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) and Cyberspace Activities (Subactivity Group 13D, $8,261, 45 FTEs) to realign resources to support the mission requirements for the standup of U.S. Space Force - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497; -54 FTE) 110 Exhibit OP-5, Subactivity Group 13F === page 115 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 2) Civilian Pay - Civilian Manpower Realignment ........................................................................................................................................ $-2,120 Decrease transfers funding and manpower from Special Programs (Subactivity Group 13F, -$2,120, -10 FTEs) and Administration (Subactivity Group 42A, -$8,480, -40 FTEs) to U.S. Air Force, to fund organic civilian professional manpower previously provided by advisory and assistance service contract support. This action effectively aligns Department of Air Force resources directly supporting the Secretary of the Air Force. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497; -10 FTE) 8. Program Increases .............................................................................................................................................................................................................................. $166,519 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $166,519 1) Civilian Pay - Average Workyear Cost Adjustment................................................................................................................................... $4,053 Increase funding in Civilian Personnel compensation adjusts average workyear costs. Each year U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these cost changes as well as updated pay raise, awards, and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497) 111 Exhibit OP-5, Subactivity Group 13F === page 116 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 2) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ..................................................................................... $4,886 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497) 3) Civilian Pay - Workforce Modernization .................................................................................................................................................... $6,955 Increase funding and manpower (65 FTEs) reflects the alignment of civilian staffing to validated mission requirements pursuant to Executive Order 14210, implementing the Presidents Department of Government Efficiency Workforce Optimization Initiative and the March 2025 Deputy Secretary of War memorandum. The Air Force conducted comprehensive data-hygiene and manpower-validation efforts, resulting in a correction where FY2026 staffing levels were set below the Airlift Operations Program established requirements. The FY2027 request reflects the full requirement necessary to support mission execution and workforce modernization. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497; 65 FTE) 4) Classified Adjustments .......................................................................................................................................................................... $121,681 Increase to a classified program. Details will be provided under separate cover with the classified Operation and Maintenance justification material. OP32: 925 Equipment Purchases (Non-Fund) 927 Air Defense Contracts & Space Support (AF) (FY 2026 Base: $486,553) 112 Exhibit OP-5, Subactivity Group 13F === page 117 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 5) U.S. Space Forces Central Service Component ...................................................................................................................................... $8,152 Increase funds for U.S. Space Forces Central (USSPACEFOR CENT) to present offensive capabilities that produce regional effects by holding adversary space systems at risk while also providing a single headquarters to synchronize space activities within its respective Area of Responsibility (AOR), with theater activities in time and space to achieve convergence through joint all domain operations. This provides funds for the operations necessary to fulfill the USSPACEFOR CENT mission and provide staff support to Space Force personnel in the theater. Funding enables the development and implementation of various threat detection and response capabilities for integrated air and missile defense/counter unmanned aerial systems for U.S. Forces and our allies in the AOR. OP32: 308 Travel of Persons 920 Supplies & Materials 922 Equipment Maintenance 927 Air Defense Contracts Space (FY 2026 Base: $486,553) 6) U.S. Space Forces Europe-Africa Service Component ............................................................................................................................ $7,269 Increase funds for U.S. Space Forces Europe-Africa (USSPACEFOR EURAF) to present offensive capabilities that produce regional effects by holding adversary space systems at risk while also providing a single headquarters to synchronize space activities within its respective Area of Responsibility, with theater activities in time and space to achieve convergence through joint all domain operations. This provides funds for the operations necessary to fulfill the USSPACEFOR EURAF mission and provide staff support to Space Force personnel in the theater. Funding of equipment and associated mission software packages is necessary to achieve initial operational capability as well as ensure space support to ongoing theater operations. OP32: 308 Travel of Persons 920 Supplies & Materials 922 Equipment Maintenance 927 Air Defense Contracts Space (FY 2026 Base: $486,553) 113 Exhibit OP-5, Subactivity Group 13F === page 118 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 7) U.S. Space Forces Indo-Pacific Service Component ............................................................................................................................. $13,523 Increase funds for U.S. Space Forces Indo-Pacific (USSPACEFOR INDOPAC) to present offensive capabilities that produce regional effects by holding adversary space systems at risk while also providing a single headquarters to synchronize space activities within its respective Area of Responsibility, with theater activities in time and space to achieve convergence through joint all domain operations. OP32: 308 Travel of Persons 920 Supplies & Materials 922 Equipment Maintenance 927 Air Defense Contracts Space (FY 2026 Base: $486,553) 9. Program Decreases .............................................................................................................................................................................................................................. $-29,949 a) One-Time FY 2026 Costs ................................................................................................................................................................................................ $-27,000 1) P.L. 119-75 - Classified Programs ......................................................................................................................................................... $-27,000 Decrease in funding following a one-time increase provided in P.L. 119-75 FY2026 Consolidated Appropriations Act for Space Force Unfunded Requirement - Classified programs. OP32: 925 Equipment Purchases (Non-Fund) b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ......................................................................................................................................................................................... $-2,949 114 Exhibit OP-5, Subactivity Group 13F === page 119 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) 1) Civilian Pay - Federal Employee Retirement System .............................................................................................................................. $-2,949 The reduction reflects updated Federal Employees Retirement System (FERS) contribution rates driven by changes in actual assumptions, workforce demographics, and projected retirement liabilities. These periodic adjustments lower the Department's required contribution for FERS regular, Revised Annuity Employees (RAE) and Further Revised Annuity Employees (FRAE). The decrease aligns with funding with the current long-term cost projections while maintaining full support for civilian retirement benefits and ensuring continued compliance with government-wide retirement requirements. OP32: 101 Executive General Schedule (FY 2026 Base: $106,721; FTE Base: 497) FY 2027 Budget Request....................................................................................................................................................................................................................... $852,239 115 Exhibit OP-5, Subactivity Group 13F === page 120 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) IV. Performance Criteria and Evaluation Summary Special Programs are classified. Details will be provided with the classified justification materials. 116 Exhibit OP-5, Subactivity Group 13F === page 121 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 2,896 1,502 1,394 3,115 1,340 1,775 3,854 1,837 2,017 739 497 242 173 173 173 0 173 0 497 497 497 0 497 0 498 498 498 0 498 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost 0 0 371 0 0 215 0 0 214 0 0 -1 Contractor FTEs (Total) 548 751 1,236 485 Active Military End Strength (E/S) (Total) Officer Enlisted Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 117 Exhibit OP-5, Subactivity Group 13F === page 122 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 64,146 0 1.28% 821 41,714 106,681 0 0.28% 299 -394 106,586 CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 103 WAGE BOARD 0 0 1.28% 0 0 0 0 0.28% 0 0 0 110 UNEMPLOYMENT COMPENSATION 0 0 2.90% 0 40 40 0 2.10% 1 0 41 121 PCS BENEFITS 2.90% 2.10% 0 0 64,146 0 TRAVEL OF PERSONS 2,918 0 TOTAL TRAVEL 2,918 0 DLA ENERGY (FUEL PRODUCTS) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 27 0 28 0 TOTAL DWCF SUPPLIES AND MATERIALS 55 0 TOTAL CIVILIAN PERSONNEL COMPENSATION 0 0 0 0 821 41,754 106,721 0 73 7,159 10,150 0 73 7,159 10,150 0 1.10% 0 -27 0 0 5.79% 2 -30 0 0 2 -57 0 0 0 0 0 300 -394 106,627 213 6,926 17,289 213 6,926 17,289 -7.08% 0 0 0 0.61% 0 0 0 0 0 0 TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 418 OTHER FUND PURCHASES 633 DLA DOCUMENT SERVICES 671 DISN INFRASTRUCTURE SERVICES (DISN-IS) 672 PRMRF PURCHASES TOTAL OTHER FUND PURCHASES 10 0 0.02% 0 -10 0 0 3.30% 0 0 0 1,109 0 -8.00% -89 -1,020 0 0 0.00% 0 0 0 -6.46% 0 997 997 0 2.30% 23 -15 1,005 -89 -33 997 0 23 -15 1,005 0 0 1,119 0 TRANSPORTATION 703 JCS EXERCISES 11 0 17.50% 2 -13 0 0 -19.64% 0 0 0 708 MSC CHARTERED CARGO 488 0 2.50% 12 -500 0 0 2.10% 0 0 0 771 COMMERCIAL TRANSPORTATION 61 0 2.50% 2 -63 0 0 2.10% 0 0 0 TOTAL TRANSPORTATION 560 0 16 -576 0 0 0 0 0 118 Exhibit OP-5, Subactivity Group 13F === page 123 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Special Programs ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 3,496 OTHER PURCHASES 914 PURCHASED COMMUNICATIONS (NON-FUND) 5,045 0 2.50% 126 -2,631 2,540 0 2.10% 53 903 915 RENTS (NON-GSA) 157 0 2.50% 4 -161 0 0 2.10% 0 0 0 920 SUPPLIES & MATERIALS (NON-FUND) 602 0 2.50% 15 5,814 6,431 0 2.10% 135 5,494 12,060 922 EQUIPMENT MAINTENANCE BY CONTRACT 1,374 -1 2.50% 34 3,082 4,489 9 2.10% 94 6,118 10,710 923 OPERATION AND MAINTENANCE OF FACILITIES 8 0 2.50% 0 -8 0 0 2.10% 0 0 0 925 EQUIPMENT PURCHASES (NON-FUND) 277,542 0 2.50% 6,939 104,909 389,390 0 2.10% 8,177 66,990 464,557 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 12,789 0 2.50% 320 6,036 19,145 0 2.10% 402 65,702 85,249 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 31,256 0 2.50% 781 -32,037 0 0 2.10% 0 321 321 933 STUDIES, ANALYSIS, & EVALUATIONS 2,000 0 2.50% 50 2,386 4,436 0 2.10% 93 -142 4,387 934 41,404 0 2.50% 1,035 1,843 44,282 0 2.10% 930 430 45,642 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 1,137 0 2.50% 28 -1,165 0 0 2.10% 0 0 0 957 LAND AND STRUCTURES 3,596 -4 2.50% 90 -3,682 0 53 2.10% 1 -54 0 987 OTHER INTRA-GOVERNMENT PURCHASES 53 0 2.50% 1 -54 0 0 2.10% 0 0 0 2.50% 2.10% 989 OTHER SERVICES 19,555 0 489 57,736 77,780 4 1,633 21,479 100,896 TOTAL OTHER PURCHASES 396,518 -5 9,913 142,067 548,493 66 11,520 167,239 727,318 GRAND TOTAL 465,316 -5 10,736 190,314 666,361 66 12,055 173,757 852,239 119 Exhibit OP-5, Subactivity Group 13F === page 124 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) I. Description of Operations Financed The funding in this Subactivity Group is for the Depot Purchased Equipment Maintenance (DPEM) portion of the Weapon System Sustainment (WSS) in the centrally managed portfolio. This includes all the organic depot level maintenance services, including hardware, Programmed Depot Maintenance, and software for the Space Force. These customers determine requirements and provide obligation authority to align with updated guidance and Depot Source of Repair (DSOR) decisions. II. Force Structure Summary The funding in this Subactivity Group supports the readiness of the Space Force's weapon systems. These include the Satellite Control Network (SCN) operations, Navigation Signal Timing and Ranging (NAVSTAR) Global Positioning System, Military Satellite Communications Terminals, Satellite Communications, Nuclear Detonation Detection System, and Space Based Infrared System (SBIRS). Collectively, they provide the United States with space domain awareness and other capabilities. This WSS sustainment area DPEM has individual commodities with their own tailored sub-process specific to software and other major end items which includes hardware maintenance. Field Commands have the overall responsibility for the weapon systems. They provide the capability to the Joint Force based on the current and projected demand for each individual weapon system. 120 Exhibit OP-5, Subactivity Group 13M === page 125 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements DEPOT MAINTENANCE SUBACTIVITY GROUP TOTAL FY 2025 Actuals $68,192 $68,192 Budget Request $67,126 $67,126 121 Amount $0 $0 Percent 0.00% 0.00% Appn $67,126 $67,126 Normalized Current Enacted $67,126 $67,126 FY 2027 Request $83,803 $83,803 Exhibit OP-5, Subactivity Group 13M === page 126 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $67,126 0 0 0 0 67,126 0 0 0 67,126 0 0 0 $67,126 $67,126 122 -139 18,054 -1,238 $83,803 Exhibit OP-5, Subactivity Group 13M === page 127 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .....................................................................................................................................................................................................$67,126 1. Congressional Adjustments ............................................................................................................................................................................................................................. $0 a) Distributed Adjustments ............................................................................................................................................................................................................. $0 b) Undistributed Adjustments ......................................................................................................................................................................................................... $0 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ................................................................................................................................................................................................................$67,126 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 123 Exhibit OP-5, Subactivity Group 13M === page 128 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) FY 2026 Appropriated and Supplemental Funding ...............................................................................................................................................................................$67,126 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .......................................................................................................................................................................................................................$67,126 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate....................................................................................................................................................................................................$67,126 6. Price Change ............................................................................................................................................................................................................................................. $-139 7. Transfers .................................................................................................................................................................................................................................................$18,054 a) Transfers In ....................................................................................................................................................................................................................... $18,054 124 Exhibit OP-5, Subactivity Group 13M === page 129 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) 1) Space Superiority - Satellite Communications ........................................................................................................................................ $18,054 Increase reflects transfer to Depot Maintenance (Subactivity Group 13M +$18,054) from CLS & Systems Support (Subactivity Group 13W -$18,054) to realign Military Satellite Communications (MILSATCOM) terminals funding to organic maintenance elements and reducing contracted logistics support across the MILSATCOM enterprise. OP32: 661 Air Force Consolidated Sustainment Activity Group (Maint) 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $66,987) b) Transfers Out ............................................................................................................................................................................................................................. $0 8. Program Increases .......................................................................................................................................................................................................................................... $0 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ...................................................................................................................................................................................................... $0 9. Program Decreases ................................................................................................................................................................................................................................ $-1,238 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ......................................................................................................................................................................................... $-1,238 125 Exhibit OP-5, Subactivity Group 13M === page 130 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) 1) Space Superiority - Polar Adjunct ............................................................................................................................................................ $-1,238 Decrease reduces funding for depot level maintenance for the Polar Adjunct program, which provides secure and reliable communications in the north Polar region, above 65 degrees North latitude. OP32: 661 Air Force Consolidated Sustainment Maintenance Group (Maint) 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $23,783) FY 2027 Budget Request..........................................................................................................................................................................................................................$83,803 126 Exhibit OP-5, Subactivity Group 13M === page 131 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) IV. PERFORMANCE CRITERIA AND EVALUATION SUMMARY Depot Maintenance Budget Amount Qty FY 2025 Inductions Amount Qty 65,571 0 65,571 34,106 0 Other 3,200 Software 30,906 Depot Maintenance Total Contractor Logistics Support (CLS) FY 2026 Budget Amount Qty Est Inductions Amount Qty 0 67,126 0 67,126 0 0 0 0 0 0 0 0 0 0 0 0 Completions Qty Carry-In Qty 0 0 34,106 0 0 3,200 0 30,906 FY 2027 Budget Amount Qty 0 83,803 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Electronics And Communications Systems Subassemblies Inter-Service 0 0 0 0 0 0 0 0 0 0 0 0 3,619 0 3,619 0 0 0 4,932 0 4,932 0 15,637 0 2,819 0 2,819 0 0 0 344 0 344 0 0 0 Electronics And Communications Systems End Item Other 800 0 800 0 0 0 0 0 0 0 8,909 0 Software 0 0 0 0 0 0 0 0 0 0 347 0 Subassemblies 0 0 0 0 0 0 4,588 0 4,588 0 6,381 0 27,846 0 27,846 0 0 0 35,826 0 35,826 0 43,520 0 0 0 0 0 0 0 0 0 0 0 0 0 Organic Electronics And Communications Systems Electronics And Communications Equipment Other 300 0 300 0 0 0 1,780 0 1,780 0 17,933 0 27,546 0 27,546 0 0 0 33,802 0 33,802 0 16,226 0 0 0 0 0 0 0 244 0 244 0 9,361 0 0 0 0 0 0 0 26,368 0 26,368 0 24,646 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 Software 0 0 0 0 0 0 23,105 0 23,105 0 24,646 0 Subassemblies 0 0 0 0 0 0 3,263 0 3,263 0 0 0 Software Subassemblies Other Contract Electronics And Communications Systems 127 Exhibit OP-5, Subactivity Group 13M === page 132 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) Qty FY 2025 Inductions Amount Qty Completions Qty Carry-In Qty FY 2026 Budget Amount Qty Est Inductions Amount Qty FY 2027 Budget Amount Qty Budget Amount Qty FY 2025 Inductions Amount Qty Completions Qty Carry-In Qty FY 2026 Budget Amount Qty Est Inductions Amount Qty FY 2027 Budget Amount Qty 2,621 0 0 0 0 0 0 0 0 0 0 0 2,621 0 0 0 0 0 0 0 0 0 0 0 2,621 0 0 0 0 0 0 0 0 0 0 0 68,192 0 65,571 0 0 0 67,126 0 67,126 0 83,803 0 Budget Amount Non-Depot Maintenance Non-Depot Maintenance Total Contractor Logistics Support (CLS) Electronics And Communications Systems Other Grand Total 128 Exhibit OP-5, Subactivity Group 13M === page 133 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 0 0 0 0 0 0 0 0 0 0 0 0 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 153 132 123 -9 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 129 Exhibit OP-5, Subactivity Group 13M === page 134 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Depot Maintenance ($ In Thousands) VII. OP-32A Line Items: 661 FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program OTHER FUND PURCHASES AIR FORCE CONSOLIDATED SUSTAINMENT ACTIVITY GROUP (MAINT) 37,494 0 6.59% 2,471 793 40,758 0 -1.70% -693 19,092 59,157 TOTAL OTHER FUND PURCHASES 37,494 0 2,471 793 40,758 0 -693 19,092 59,157 OTHER DEPOT MAINTENANCE (NON-FUND) 30,698 0 767 -5,097 26,368 0 554 -2,276 24,646 TOTAL OTHER PURCHASES 30,698 0 767 -5,097 26,368 0 554 -2,276 24,646 GRAND TOTAL 68,192 0 3,238 -4,304 67,126 0 -139 16,816 83,803 OTHER PURCHASES 930 2.50% 130 2.10% Exhibit OP-5, Subactivity Group 13M === page 135 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) I. Description of Operations Financed Facilities Sustainment, Restoration & Modernization (FSRM) functions include facility and infrastructure sustainment, restoration, modernization and demolition activities at all U.S. Space Force installations, including large life-cycle repairs for all Active Force Field Commands. FSRM activities ensure installation facilities, utility systems, and infrastructure are capable of fully supporting mission requirements throughout their economic lives. Sustainment is performed through a combination of workforce and contract support. Sustainment is the maintenance and repair necessary to keep facilities in good working order. It includes regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response. Sustainment also includes service calls for minor or major repairs and periodic replacement of facility components (usually accomplished by contract) that occur throughout the life cycle of facilities. It does not include environmental compliance costs, facility leases or other tasks associated with facilities operations (such as custodial services, grounds services, waste disposal and the provision of utilities). The Department of War (DoW) Facilities Sustainment Model (FSM) is used as the standardized model for forecasting facilities sustainment resource requirements. The FSM uses the following formula to develop the sustainment requirement: Annual sustainment requirement = facility quantity x sustainment cost factor x location factor x inflation - Facility quantity is the facility size expressed in the Facility Analysis Category (FAC) unit of measure (such as square feet) - Sustainment cost factor is the average annual unit cost (in current year dollars) for sustaining the average size facility in the given FAC - Location factor is a location adjustment based upon the local costs for labor, equipment, materials and currency exchange rates (overseas) compared with an overall base city average - Inflation has a factor that is used to adjust current year prices to the target future year The Department uses a sustainment metric which is the comparison of sustainment funding to the requirement for a given year, expressed as a rate. Sustainment rate (%) = sustainment funding (FSM requirement) Restoration is the restoration of real property to such a condition that it may be used for its designated purpose. This includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. Modernization is the alteration or replacement of facilities solely to implement new or higher standards, to accommodate new functions or to replace building components that typically last more than 50 years (such as the framework or foundation). Modernization also includes infrastructure repairs and minor construction to accommodate changes in mission requirements, including new mission beddowns. Modernization is critical to ensure aging facilities remain capable of supporting mission requirements as they evolve over the long lives of facilities and infrastructure systems. 131 Exhibit OP-5, Subactivity Group 13R === page 136 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) Recapitalization means the major renovation or reconstruction activities (including facility replacements) needed to keep existing facilities modern and relevant in an environment of changing standards and missions. Recapitalization extends the service life of facilities or restores lost service life. It includes restoration and modernization of existing facilities. Plant Replacement Value (PRV) is used as the basis for generating recapitalization requirements. The Department of War standardized formula for calculating PRV is: PRV = facility quantity x construction cost factor x location factor x Planning & Design (P&D) factor x historical factor x contingency factor x Supervision, Inspection and Overhead (SIOH) x inflation - Facility quantity is the facility size expressed in the FAC unit of measure (such as square feet) - Construction cost factor is the average annual unit cost (in current year dollars) for constructing the average size facility to current standards in the given FAC - Location factor is a location adjustment based upon the local costs for labor, equipment, materials and currency exchange rates (overseas) compared with an overall base city average - P&D factor is an adjustment to account for typical project planning and design costs - Historical factor is an adjustment for historical architecture and materials (when applicable) - Contingency factor is an adjustment for typical contingency costs during construction - SIOH is an adjustment for supervision, inspection and overhead costs associated with construction management - Inflation has a factor that is used to adjust current year prices to the target future year The U.S. Space Force’s $1.8 billion in FY27 FSRM funding will accelerate the modernization of aging spaceport infrastructure at Vandenberg Space Force Base (CA) and Cape Canaveral Space Force Station (FL). This investment ensures resilient and assured access to space, enabling the U.S. to meet rising launch demands for National Security Space Launch (NSSL) missions. The growth in funding and associated FSRM projects directly support the upgrade of these critical spaceports. Assured access to space is essential for NSSL missions, but achieving this requires robust infrastructure investment to enhance resiliency. Additionally, these improvements help meet increasing launch capacity demands driven by commercial satellite launches, in line with U.S. commercial space launch cooperation. We are prioritizing FSRM investments to mitigate mission risk and support the Spaceport of the Future initiative. Through these significant investments, the Space Force is positioning itself to meet the expanding demands on military launch infrastructure and ensure continued mission success. 132 Exhibit OP-5, Subactivity Group 13R === page 137 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) As new capabilities are introduced, the U.S. Space Force must be prepared to operate both current and future missions. Success will depend on having the right personnel and the appropriate facilities to support these evolving requirements. The increasing demand from new missions assigned to the Space Force will necessitate growth in both workforce and infrastructure. To meet this demand, the Space Force requires expanded training facilities, including classrooms and dormitories, to accommodate a larger training pipeline. Wellequipped training centers are essential for developing both individual Guardians and operational units, ensuring the Space Force is ready to achieve and maintain space superiority. Demolition is solely performed by contract. Facilities and infrastructure are demolished to free space for future construction and to eliminate obsolete facilities from the real property inventory. Demolition is a key component of the Space Force strategy to consolidate functions, vacate excess and obsolete facilities, and focus FSRM funding on facilities intended to function far into the future. Our FSRM efforts going forward will ensure we meet the operational launch and test requirements of the Depart of War as well as advancing the national security interests in the launch enterprise. The most significant categories receiving this support include: -Critical infrastructure, including utility systems -Command and control facilities -Intelligence gathering and analysis facilities -Airfield runways, taxiways and ramps -Maintenance and generation complexes -Dormitories and dining facilities -Training ranges and supporting infrastructure II. Force Structure Summary Supports facilities sustainment at all U.S. Space Force installations. Supports large life-cycle sustainment repair and all demolition, restoration and modernization for all active Force Field Commands. 133 Exhibit OP-5, Subactivity Group 13R === page 138 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements MAINTENANCE OF REAL PROPERTY SUBACTIVITY GROUP TOTAL FY 2025 Actuals $529,024 $529,024 Budget Request $557,175 $557,175 134 Amount $-6,493 $-6,493 Percent -1.17% -1.17% Appn $550,682 $550,682 Normalized Current Enacted $550,682 $550,682 FY 2027 Request $1,384,326 $1,384,326 Exhibit OP-5, Subactivity Group 13R === page 139 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $557,175 0 0 0 -6,493 550,682 0 0 0 550,682 0 0 0 $550,682 $550,682 14,142 0 819,502 $1,384,326 The FY 2027 request for Real Property Maintenance includes $1,384,326 thousand of discretionary and $414,314 thousand of mandatory (reconciliation) for a total of $1,789,640 thousand. The FY 2027 mandatory funds to continue efforts from FY2026 of critical investment in foundational readiness and long-term viability of the U.S. Space Force. This funding directly addresses maintenance and repair requirements in support of mission assurance, combat readiness, and the quality of life for Guardians. The FY 2026 spend plan for Real Property Maintenance includes $550,682 thousand of discretionary and $20,000 thousand of mandatory (reconciliation) for a total of $5,738,712 thousand. 135 Exhibit OP-5, Subactivity Group 13R === page 140 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $557,175 1. Congressional Adjustments .................................................................................................................................................................................................................... $-6,493 a) Distributed Adjustments ............................................................................................................................................................................................................. $0 b) Undistributed Adjustments ......................................................................................................................................................................................................... $0 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ............................................................................................................................................................................................................. $-6,493 1) Savings Attributable to Efficiencies and Management Improvements..................................................................................................... $-6,493 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $550,682 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 136 Exhibit OP-5, Subactivity Group 13R === page 141 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $550,682 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $550,682 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $550,682 6. Price Change ..........................................................................................................................................................................................................................................$14,142 7. Transfers .......................................................................................................................................................................................................................................................... $0 a) Transfers In ................................................................................................................................................................................................................................ $0 b) Transfers Out ............................................................................................................................................................................................................................. $0 8. Program Increases .............................................................................................................................................................................................................................. $819,502 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 137 Exhibit OP-5, Subactivity Group 13R === page 142 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $819,502 1) Facilities Sustainment - Classified ....................................................................................................................................................... $223,200 Increase to a classified program. Details will be provided under separate cover with the classified Operation and Maintenance justification material. OP32: 957 Other Costs-Lands and Structures (FY 2026 Base: $291,876) 2) Facilities Sustainment - Improving Unaccompanied Housing .............................................................................................................. $161,902 Increased Unaccompanied Housing (UH) funding levels continue to support the highest priority requirements and address critical findings from the Barracks Task Force. These investments improve the sustainment of facilities by increasing the current percentfunded from 80 percent to above 90 percent of modeled sustainment requirements, providing additional resources to reduce future maintenance costs and prevent facility degradation. Improvements will elevate quality of life standards for service members, reduce issue response times, and advance comprehensive restoration and modernization projects to address housing facilities in poor or failing conditions. By strategically investing in UH infrastructure, this funding ensures Guardians have access to safe, modern, and well-maintained living environments that support readiness, morale, and mission effectiveness. OP32: 957 Other Costs-Lands and Structures (FY 2026 Base: $291,876) 138 Exhibit OP-5, Subactivity Group 13R === page 143 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) 3) Facilities Sustainment - Resilient Operations ......................................................................................................................................... $67,500 Increase funds support the replication of the consolidated space operations facility design from Schriever Space Force Base by establishing 4 operational centers at key locations across the continental United States and provide operational resilience for 24 combat units. These centers will be modeled after the original facility to support critical missions, including air moving target indicator, ground moving target indicator, the proliferated warfighter space architecture global mission, as well as range and aggressor operations. By replicating this proven design, these investments enhance the joint force’s readiness, strengthen operational resilience, and ensure the capability to execute essential missions in an increasingly dynamic and contested environment. This supports the U.S. Space Force's investment in resilient operations, critical to combat the increasingly contested and competitive space domain. OP32: 957 Other Costs-Lands and Structures (FY 2026 Base: $291,876) 4) Facilities Sustainment - Support Active Duty Military End Strength Growth ........................................................................................ $300,000 Increase funds prioritize Facility Sustainment, Restoration, and Modernization to support the expansion of Space Force military end strength and ensure infrastructure is prepared to meet evolving mission requirements. Investments will focus on upgrading and modernizing facilities to accommodate personnel growth, operational needs, and the delivery of new weapon systems. These enhancements are critical to creating a resilient infrastructure capable of supporting the complexities of modern space operations. By addressing infrastructure needs, this funding ensures the Space Force is positioned to meet strategic challenges, integrate advanced capabilities, and sustain its growing force of Guardians, all while securing the nation’s interests in the contested space domain. OP32: 957 Other Costs-Lands and Structures (FY 2026 Base: $291,876) 139 Exhibit OP-5, Subactivity Group 13R === page 144 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) 5) Facilities Sustainment - USNORTHCOM Sustainment .......................................................................................................................... $66,900 Increase funds support critical U.S. Northern Command (USNORTHCOM) and North American Aerospace Defense Command priorities to enhance mission readiness and operational effectiveness. Key investments include upgrades to command and control facilities, sustainment of specialized operational systems, improvements to infrastructure survivability, and the purchase of additional counter-threat capabilities. These efforts are essential to strengthening homeland defense, ensuring operational resilience, and maintaining the ability to respond to evolving threats. OP32: 957 Other Costs-Lands and Structures (FY 2026 Base: $291,876) 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 FY 2027 Budget Request.................................................................................................................................................................................................................... $1,384,326 140 Exhibit OP-5, Subactivity Group 13R === page 145 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) IV. Performance Criteria and Evaluation Summary: Demolition Restoration/Modernization Sustainment Total FY 2025 Actuals 6,181 172,081 350,762 529,024 FY 2026 Enacted 7,086 251,720 291,876 550,682 141 FY 2027 Request 7,251 214,670 1,162,405 1,384,326 Exhibit OP-5, Subactivity Group 13R === page 146 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 0 0 0 0 0 0 0 0 0 0 0 0 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 298 0 0 0 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 142 Exhibit OP-5, Subactivity Group 13R === page 147 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Maintenance of Real Property ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program TRAVEL OF PERSONS 263 0 2.50% 7 -270 0 0 2.10% 0 0 0 TOTAL TRAVEL 263 0 7 -270 0 0 0 0 0 DLA ENERGY (FUEL PRODUCTS) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 406 0 1.10% 4 -410 0 0 -7.08% 0 0 0 306 0 5.79% 0.61% TOTAL DWCF SUPPLIES AND MATERIALS 712 0 1,535 0 75 0 33,223 0 TRAVEL 308 DWCF SUPPLIES AND MATERIALS 401 418 18 -324 0 0 22 -734 0 0 0 0 0 0 0 0 2.50% 38 -1,573 0 0 2.50% 2 -77 0 0 2.10% 0 0 0 2.10% 0 0 -3 2.50% 831 -34,051 0 0 36 2.10% 1 -37 0 2.50% 0 0 0 0 0 2.10% 0 0 0 OTHER PURCHASES 914 PURCHASED COMMUNICATIONS (NON-FUND) 915 RENTS (NON-GSA) 920 SUPPLIES & MATERIALS (NON-FUND) 921 PRINTING & REPRODUCTION 922 EQUIPMENT MAINTENANCE BY CONTRACT 3,215 0 2.50% 80 -3,295 0 0 2.10% 0 0 0 923 OPERATION AND MAINTENANCE OF FACILITIES 52,145 -5 2.50% 1,304 -53,444 0 64 2.10% 1 -65 0 925 EQUIPMENT PURCHASES (NON-FUND) 1,367 0 2.50% 34 -1,401 0 0 2.10% 0 0 0 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 273 0 2.50% 7 -280 0 0 2.10% 0 0 0 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 2,000 0 2.50% 50 -2,050 0 0 2.10% 0 0 0 934 1,800 0 2.50% 45 -1,845 0 0 2.10% 0 0 0 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 957 LAND AND STRUCTURES 960 INTEREST AND DIVIDENDS 987 OTHER INTRA-GOVERNMENT PURCHASES 989 OTHER SERVICES 66 0 2.50% 2 -68 0 0 2.10% 0 0 0 432,194 197 2.50% 10,810 107,481 550,682 2,425 2.10% 11,615 819,604 1,384,326 0 0 2.50% 0 0 0 0 2.10% 0 0 0 152 0 2.50% 4 -156 0 0 2.10% 0 0 0 4 0 2.50% 0 -4 0 0 2.10% 0 0 0 TOTAL OTHER PURCHASES 528,049 189 13,206 9,238 550,682 2,525 11,617 819,502 1,384,326 GRAND TOTAL 529,024 189 13,235 8,234 550,682 2,525 11,617 819,502 1,384,326 143 Exhibit OP-5, Subactivity Group 13R === page 148 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) I. Description of Operations Financed The funding in this Subactivity Group is for the Contractor Logistics Support (CLS), Sustaining Engineering (SE), and Technical Orders (TO) portions of the Weapon System Sustainment (WSS) in the centrally managed portfolio. CLS provides all or part of the sustainment functions, with organic depot maintenance work accomplished through partnerships. SE covers funding for engineering efforts to resolve technical deficiencies in weapon systems, and TO ensures up-to-date technical data for space weapon systems. II. Force Structure Summary The funding in this Subactivity Group supports the readiness of the Space Force's weapon systems. These include the Satellite Control Network (SCN) operations, NAVSTAR Global Positioning System, Military Satellite Communications Terminals, Satellite Communications, Nuclear Detonation Detection System, and Space Based Infrared System (SBIRS). Collectively, they provide the U.S. with space domain awareness and other capabilities. These WSS sustainment areas (CLS, SE and TO) have individual commodities with their own tailored sub-process specific to software, sustaining engineering, technical order data management, and other major end items which includes hardware maintenance. The field commands have the overall responsibility for the weapon systems. They provide the capability to the joint force based on the current and projected demand for each individual weapon system. 144 Exhibit OP-5, Subactivity Group 13W === page 149 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements CLS & SYSTEMS SUPPORT SUBACTIVITY GROUP TOTAL FY 2025 Actuals $1,337,074 $1,337,074 Budget Request $1,495,242 $1,495,242 145 Amount $-15,000 $-15,000 Percent -1.00% -1.00% Appn $1,480,242 $1,480,242 Normalized Current Enacted $1,480,242 $1,480,242 FY 2027 Request $2,096,381 $2,096,381 Exhibit OP-5, Subactivity Group 13W === page 150 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $1,495,242 -15,000 0 0 0 1,480,242 0 0 0 1,480,242 0 0 0 $1,480,242 $1,480,242 146 31,417 -18,054 602,776 $2,096,381 Exhibit OP-5, Subactivity Group 13W === page 151 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request ............................................................................................................................................................................................... $1,495,242 1. Congressional Adjustments .................................................................................................................................................................................................................. $-15,000 a) Distributed Adjustments ................................................................................................................................................................................................... $-15,000 1) Unjustified Growth .................................................................................................................................................................................. $-15,000 b) Undistributed Adjustments ......................................................................................................................................................................................................... $0 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount .......................................................................................................................................................................................................... $1,480,242 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 147 Exhibit OP-5, Subactivity Group 13W === page 152 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ......................................................................................................................................................................... $1,480,242 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate ................................................................................................................................................................................................................. $1,480,242 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate.............................................................................................................................................................................................. $1,480,242 6. Price Change ..........................................................................................................................................................................................................................................$31,417 7. Transfers ............................................................................................................................................................................................................................................... $-18,054 a) Transfers In ................................................................................................................................................................................................................................ $0 b) Transfers Out ................................................................................................................................................................................................................... $-18,054 148 Exhibit OP-5, Subactivity Group 13W === page 153 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 1) Space Superiority - Satellite Communications ....................................................................................................................................... $-18,054 Decrease reflects transfer from Contracted Logistics Support & Systems Support (Subactivity Group 13W -$18,054) to Depot Maintenance (Subactivity Group 13M +$18,054) to realign Military Satellite Communications (MILSATCOM) Terminals funding to organic maintenance elements and reducing contracted logistics support across the MILSATCOM enterprise. OP32: 661 Air Force Consolidated Sustainment Activity Group (Maint) 930 Other Depot Maintenance (Non-Fund) 8. Program Increases .............................................................................................................................................................................................................................. $602,776 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $602,776 1) Classified Adjustments .......................................................................................................................................................................... $134,249 Increase to a classified program. Details will be provided under separate cover with the classified Operation and Maintenance justification material. OP32: 927 Air Defense Contracts & Space Support (FY 2026 Base: $131,000) 149 Exhibit OP-5, Subactivity Group 13W === page 154 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 2) NORAD Cheyenne Mountain Complex - Integrated Tactical Warning and Attack Assessment ............................................................ $23,394 Increase strengthens the credibility of the U.S. nuclear deterrent and maintain strategic stability by ensuring seamless and secure communication between national command authorities and strategic nuclear forces. Investing in the modernization and protection of this critical infrastructure is crucial, as it will enable the U.S. to retain command and control of its nuclear forces in all scenarios, thereby reducing the risk of miscalculation and protecting national security from emerging threats. This investment funds additional sustaining engineering, cybersecurity, technical data management support, and on-site mission assurance support. OP32: 930 Other Depot Maintenance (Non-DWCF) (FY 2026 Base: $121,807) 3) Space Superiority - Ballistic Missile Early Warning System ................................................................................................................... $32,410 Increase for the Ballistic Missile Early Warning System (BMEWS) is essential to modernize aging infrastructure by replacing outdated radar systems and enhance detection capabilities in response to evolving ballistic missile threats, including hypersonic weapons, by integrating advanced signal processing systems and enhancing cybersecurity defenses. BMEWS provides critical early warning data to national command authorities and missile defense systems, enabling timely responses to potential attacks. This investment demonstrates a commitment to maintaining a robust and reliable BMEWS capability, vital for protecting the U.S. homeland and ensuring national security. OP32: 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $31,240) 150 Exhibit OP-5, Subactivity Group 13W === page 155 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 4) Space Superiority - Defense Meteorological Satellite Program .............................................................................................................. $22,101 Increase for the Defense Meteorological Satellite Program (DMSP) required to address critical sensor degradation and ensure continued operational availability during the transition to the Weather System Follow-on (WSF) program. DMSP provides vital global weather data and space environment monitoring essential for DoW operations. The increased funding will support replacement components and intensified engineering efforts to mitigate risks associated with aging satellite systems, thereby maintaining data quality and availability. This investment demonstrates a commitment to warfighter support by bridging the gap until WSF achieves full operational capability. OP32: 922 Equipment Maintenance by Contract 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $10,969) 5) Space Superiority - Global Positioning System III Space Segment ....................................................................................................... $10,545 Increase for the Global Positioning System (GPS) III Space Segment is crucial to accelerate the deployment of advanced satellites with enhanced signal strength, improved accuracy, and greater resistance to both jamming and spoofing while supporting additional satellites and modernizing ground control systems. The GPS III Space Segment is a component of NAVSTAR GPS and provides critical Positioning, Navigation, and Timing (PNT) data essential for military operations, civilian infrastructure, and global commerce. This investment demonstrates a commitment to maintaining GPS as a resilient and reliable PNT resource, vital for national security and economic stability. OP32: 922 Equipment Maintenance by Contract 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $23,361) 151 Exhibit OP-5, Subactivity Group 13W === page 156 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 6) Space Superiority - Joint Tactical Ground System ................................................................................................................................. $12,537 Increase for the Joint Tactical Ground System (JTAGS) is essential to bolster the system's capability to deliver timely and precise missile warning data to ground-based tactical warfighters. By leveraging space-based sensor data, JTAGS provides battlefield commanders with critical insights into missile launches and emerging threats. This investment will provide for additional software and hardware maintenance, obsolescence mitigation, sustaining engineering, cybersecurity, field service representatives (on-site tech support) and software licenses. OP32: 930 Other Depot Maintenance (Non-DWCF) (FY 2026 Base: $17,250) 7) Space Superiority - NAVSTAR Global Positioning System .................................................................................................................... $30,953 Increase for the NAVSTAR GPS is necessary to accelerate the integration of enhanced cybersecurity measures and anti-jamming capabilities, ensuring uninterrupted GPS availability for military operations in contested environments. GPS provides critical Positioning, Navigation, and PNT data essential for weapons systems, navigation, and situational awareness for warfighters worldwide. This investment demonstrates a commitment to maintaining GPS as a resilient and reliable PNT resource, vital for national security and global stability. OP32: 922 Equipment Maintenance by Contract 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $129,181) 152 Exhibit OP-5, Subactivity Group 13W === page 157 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 8) Space Superiority - Satellite Communications ........................................................................................................................................ $85,536 Increase for Satellite Communications (SATCOM) is essential to enhance network resilience through the integration of advanced antijamming technologies and expand bandwidth capacity to meet the growing demand for secure and reliable communications across the battlespace. SATCOM provides critical connectivity for command and control, intelligence sharing, and situational awareness for deployed forces worldwide. This investment demonstrates a commitment to maintaining a robust and secure SATCOM architecture, vital for enabling effective military operations in a dynamic and global environment. OP32: 922 Equipment Maintenance by Contract 925 Equipment Purchases (Non-Fund) 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $322,105) 9) Space Superiority - Satellite Control Network ......................................................................................................................................... $56,599 Increase for the Satellite Control Network (SCN) is required to modernize infrastructure and enhance cybersecurity defenses in response to evolving threats to space assets. The SCN provides critical command and control capabilities for a wide range of U.S. military and government satellites, ensuring their operational effectiveness and data integrity. The increased funding will support the replacement of aging hardware, the implementation of advanced cybersecurity protocols, and the expansion of network capacity to accommodate the growing number of satellites under its control. This investment demonstrates a commitment to maintaining the resilience and security of the SCN, vital for ensuring continued access to space-based capabilities. OP32: 922 Equipment Purchase by Contract 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $55,386) 153 Exhibit OP-5, Subactivity Group 13W === page 158 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 10) Space Superiority - Sea-Launched Ballistic Missile Radar Warning System ....................................................................................... $28,050 Increase for the Sea-Launched Ballistic Missile (SLBM) Radar Warning System is required to enhance the system's ability to detect and track increasingly sophisticated sea-launched ballistic missile threats through modernized radar systems, the integration of advanced signal processing algorithms, and expanding data sharing capabilities with other early warning assets. The SLBM Radar Warning System provides critical early warning data to national command authorities and missile defense systems, enabling timely responses to potential attacks. This investment demonstrates a commitment to maintaining a robust and reliable SBLM Radar Warning System, vital for protecting the U.S. homeland and ensuring national security. OP32: 930 Other Depot Maintenance (Non-Fund) (FY 2026 Base: $27,648) 11) Space Superiority - Space Based Infrared System ............................................................................................................................ $122,737 Increase supports the SBIRS Mobile Ground System (SMGS), a critical component that will serve as the sole U.S. system providing resilient support to the Integrated Tactical Warning and Attack Assessment (ITW/AA) system, as well as the Chairman of the Joint Chiefs of Staff (CJCS) designated critical nodes and nuclear command and control systems. The SMGS will replace six legacy Defense Support Program (DSP)-only mobile ground terminals, as well as the Survivable Mission Control Station (SMCS) and Survivable Ground Station (SRGS), ensuring a more robust and survivable capability for the U.S. military. This investment will also provide additional field service representatives (on-site tech support), software and hardware maintenance, obsolescence mitigation, sustaining engineering and cybersecurity. OP32: 922 Equipment Maintenance by Contract 930 Other Depot maintenance (Non-DWCF) (FY 2026 Base: $270,303) 154 Exhibit OP-5, Subactivity Group 13W === page 159 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) 12) Space Superiority - Space Situation Awareness Operations ............................................................................................................... $43,665 Increase funds space situation awareness operations that are vital to improving the detection, tracking, and characterization of the growing number of space objects, including potential threats to U.S. space-based assets. By providing critical intelligence on the space environment, space situation awareness operations play a crucial role in safeguarding vital satellite systems and informing strategic decision-making. The additional funding will enable the expansion of sensor networks, the development of advanced data analytics, and an increase in analyst capacity, allowing for more effective monitoring and response to emerging space-based threats. This investment underscores the commitment to maintaining U.S. space superiority, ensuring the continued availability of spacebased capabilities, and protecting national security interests in the increasingly contested space domain. This investment will fund additional hardware maintenance for space fence, C-Band, Eglin and SST cybersecurity. OP32: 922 Equipment Maintenance by Contract 930 Other Depot maintenance (Non-DWCF) (FY 2026 Base: $171,763) 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 FY 2027 Budget Request.................................................................................................................................................................................................................... $2,096,381 155 Exhibit OP-5, Subactivity Group 13W === page 160 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) IV. PERFORMANCE CRITERIA AND EVALUTION SUMMARY Depot Maintenance Depot Maintenance Total Contractor Logistics Support (CLS) Electronics And Communications Systems Electronics And Communications Equipment Budget Amount Qty FY 2025 Inductions Amount Qty 691,463 0 691,463 685,077 0 FY 2026 Budget Amount Qty Est Inductions Amount Qty FY 2027 Budget Amount Qty 0 679,174 0 1,091,040 0 672,028 0 672,028 0 1,082,525 0 Completions Qty Carry-In Qty 0 0 0 679,174 685,077 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 End Item 90,097 0 90,097 0 0 0 59,269 0 59,269 0 88,538 0 Other 29,243 0 29,243 0 0 0 91,507 0 91,507 0 200,900 0 Software 420,365 0 420,365 0 0 0 375,185 0 375,185 0 515,364 0 Subassemblies 145,372 0 145,372 0 0 0 146,067 0 146,067 0 277,723 0 6,386 0 6,386 0 0 0 7,146 0 7,146 0 8,515 0 6,386 0 6,386 0 0 0 7,146 0 7,146 0 8,515 0 Completions Qty Carry-In Qty FY 2026 Budget Amount Qty Est Inductions Amount Qty FY 2027 Budget Amount Qty Organic Electronics And Communications Systems Software Non-Depot Maintenance Non-Depot Maintenance Total Contractor Logistics Support (CLS) Budget Amount Qty FY 2025 Inductions Amount Qty 645,611 0 645,611 0 0 0 801,068 0 801,068 0 1,005,341 0 514,569 0 514,569 0 0 0 672,524 0 672,524 0 862,059 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Electronics And Communications Systems Command & Control Electronics And Communications Equipment 156 Exhibit OP-5, Subactivity Group 13W === page 161 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) Budget Amount Qty FY 2025 Inductions Amount Qty Other 449,613 0 449,613 Software 55,053 0 55,053 Subassemblies 9,903 0 0 0 Organic FY 2026 Budget Amount Qty Est Inductions Amount Qty 0 589,103 0 589,103 0 60,148 0 60,148 0 0 23,273 0 0 0 0 0 0 Completions Qty Carry-In Qty 0 0 0 0 9,903 0 0 FY 2027 Budget Amount Qty 0 740,754 0 0 76,492 0 23,273 0 44,813 0 0 0 0 0 Electronics And Communications Systems Other Other Contract Electronics And Communications Systems Electronics And Communications Equipment 0 0 0 0 0 0 0 0 0 0 0 0 131,042 0 0 0 128,544 0 128,544 0 143,282 0 0 0 0 0 0 0 0 0 0 0 0 0 3,340 0 3,340 0 0 0 4,134 0 4,134 0 5,308 0 Other 116,095 0 116,095 0 0 0 115,104 0 115,104 0 129,965 0 Subassemblies 11,607 0 11,607 0 0 0 9,306 0 9,306 0 8,009 0 1,337,074 0 1,337,074 0 0 0 1,480,242 0 1,480,242 0 2,096,381 0 End Item Grand Total 0 131,042 157 Exhibit OP-5, Subactivity Group 13W === page 162 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 0 0 0 0 0 0 0 0 0 0 0 0 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,683 7,399 10,480 3,081 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 158 Exhibit OP-5, Subactivity Group 13W === page 163 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: CLS & Systems Support ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 331,212 161 2.50% 8,284 22,122 361,779 325 2.10% 7,604 42,189 411,897 OTHER PURCHASES 922 EQUIPMENT MAINTENANCE BY CONTRACT 925 EQUIPMENT PURCHASES (NON-FUND) 441 0 2.50% 11 87 539 0 2.10% 11 -131 419 930 OTHER DEPOT MAINTENANCE (NON-FUND) 1,005,421 0 2.50% 25,136 87,367 1,117,924 0 2.10% 23,476 542,665 1,684,065 TOTAL OTHER PURCHASES 1,337,074 161 33,431 109,576 1,480,242 325 31,092 584,722 2,096,381 GRAND TOTAL 1,337,074 161 33,431 109,576 1,480,242 325 31,092 584,722 2,096,381 159 Exhibit OP-5, Subactivity Group 13W === page 164 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) I. Description of Operations Financed The Base Support program provides funding for installation support functions, engineering and environmental programs in support of U.S. Space Force installations. The program sustains mission capability, quality of life, workforce productivity and infrastructure support. Significant categories of support are listed below. Unaccompanied Personnel Housing Services (UPH): Includes execution of government owned, leased, contracted, or privatized UPH. Functional categories include unaccompanied personnel housing including permanent party UPH management services, initial issue of furnishings (furniture, appliances, and equipment) for newly constructed and renovated facilities, and management of replacement furnishings (repair, replace, control, moving and handling, inventory, warehousing and disposal). Airfield Operations: Includes contracts, peculiar and support equipment, and associated costs specifically identified to plan, manage, coordinate, and execute airfield operations. This includes weather, Air Traffic Control (ATC), terminal airspace management, airfield and flight management, RADAR, Air Traffic Control and Landing System (ATCALS) (including off airfield navigational aids), communications systems maintenance, airfield equipment, transient services, liaison with installation movement for the provision of airfield passenger and cargo terminals, and support to assigned, tenant, and transient U.S. military aircraft and aircrew. Command Support: Includes contracts, peculiar and support equipment, and associated costs specifically identified and measurable to plan, manage, coordinate, and execute command support functions such as Command Management (CM), installation Public Affairs (PA), Legal Support (LS), Financial Management (FM), Management Analysis (MA), procurement operations, installation safety, installation chaplain ministries, and installation history and museums. CM includes postal services, honors/protocol, advisory services, administration, executive office, and inspector general/internal review. PA includes distribution of internal information (e.g., base newspapers, military radio/TV stations); public information (e.g., press releases, media training/outreach), website content management. LS includes military justice, installation operations, administrative, international, business law, claims. FM includes program/budget analysis/development, financial advisory services, budget execution support, accounting liaison services. MA includes strategic planning, requirements development, performance management systems, and organizational structure analysis. Procurement operations includes purchasing, leasing, obtaining supplies, services, non-military construction; contract operations, and government purchase card management. Installation safety includes training, evaluations/consultations; mishaps, near misses/complaint investigations; airfield, industrial, off-duty recreational, range, explosives, and traffic safety awareness programs. Chaplain ministries includes worship services, chaplaincy education/training, advice to the commander, and counseling. History and museums includes maintaining an accurate record of installation activities in peace/war, and management of museums/historical artifacts. Installation Law Enforcement Operations: Includes contracts, peculiar and support equipment, and associated costs specifically identified and measurable to plan, manage, coordinate, and execute functions of installation Law Enforcement (LE) operations and physical security. Installation LE Operations includes enforcing federal, state and military law, enforcing installation guidance, issuance of citations, detaining suspects, motor vehicle traffic management, traffic investigations, apprehension and restraint of offenders, crowd control, crime prevention, crime detection, LE patrols, LE liaison, apprehension of persons who commit crimes on the installation, testifying in prosecution cases and temporary detention of offenders. This includes protecting, defending, and deterring against criminal activities, conduct of minor investigations, the development of plans for the employment of law enforcement personnel, emergency response, and management as it relates to law enforcement activities and functions and which includes all processes intended to preserve the principles of law through various strategies. Physical security includes roaming security patrols, entry control, electronic security system installation, 160 Exhibit OP-5, Subactivity Group 13Z === page 165 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) monitoring, and maintenance, physical barriers such as fencing, bollards, drop arms and gates to protect the installation, technology integration of positive control measures, badging systems, surveillance and demarcation of controlled and restricted areas. Facilities Operations: This program provides engineering operations, engineering services, and real property management required to accomplish municipal-type activities. These activities include emergency services (fire protection and aircraft crash rescue), utility plant operations, refuse collection and disposal (including non-hazardous recycling), custodial services, snow removal, street sweeping, grounds maintenance, and insect control. The program also funds real property leases and purchased utilities (electric, gas, water and sewer). II. Force Structure Summary This program provides funding for installation support functions, engineering and environmental programs in support of all Active U.S. Space Force field commands. The program sustains mission capability, quality of life, workforce productivity and infrastructure support. 161 Exhibit OP-5, Subactivity Group 13Z === page 166 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements BASE SUPPORT SUBACTIVITY GROUP TOTAL FY 2025 Actuals $238,975 $238,975 Budget Request $233,546 $233,546 162 Amount $-1,308 $-1,308 Percent -0.56% -0.56% Appn $232,238 $232,238 Normalized Current Enacted $232,238 $232,238 FY 2027 Request $550,911 $550,911 Exhibit OP-5, Subactivity Group 13Z === page 167 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $233,546 15 0 0 -1,323 232,238 0 0 0 232,238 0 0 0 $232,238 $232,238 2,447 170 316,056 $550,911 The FY 2026 spend plan amount for Base Support includes $232,238 thousand of discretionary and $15,000 of mandatory (reconciliation) for a total of $247,238 thousand. 163 Exhibit OP-5, Subactivity Group 13Z === page 168 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $233,546 1. Congressional Adjustments .................................................................................................................................................................................................................... $-1,308 a) Distributed Adjustments ........................................................................................................................................................................................................... $15 1) P.L. 119-75 - Travel Allowance for Armed Forces Assigned to Alaska ......................................................................................................... $15 b) Undistributed Adjustments ......................................................................................................................................................................................................... $0 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ............................................................................................................................................................................................................. $-1,323 1) Bulk Fuels ................................................................................................................................................................................................ $-1,323 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $232,238 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 164 Exhibit OP-5, Subactivity Group 13Z === page 169 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $232,238 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $232,238 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $232,238 6. Price Change ............................................................................................................................................................................................................................................$2,447 7. Transfers ...................................................................................................................................................................................................................................................... $170 a) Transfers In ............................................................................................................................................................................................................................ $170 165 Exhibit OP-5, Subactivity Group 13Z === page 170 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) 1) Civilian Pay - Base Operation Support ....................................................................................................................................................... $170 Increase transfers funding and manpower to Base Support (Subactivity Group 13Z, $170, 1 FTE) from the Department of the Navy to support operations at Prospect Harbor, ME. OP32: 101 General Executive Schedule (FY 2026 Base: $0; FTE Base: 0; 1 FTE) b) Transfers Out ............................................................................................................................................................................................................................. $0 8. Program Increases .............................................................................................................................................................................................................................. $316,056 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $316,056 166 Exhibit OP-5, Subactivity Group 13Z === page 171 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) 1) Base Operations Support - Fully Fund Enterprise Information Technology ......................................................................................... $301,056 Increase funds tech debt up to top secret at U.S. Space Force installations. This will include the wide area network connection and boundary infrastructure (unclassified/classified), base area network (wired/wireless), (classified/unclassified) (mission networks), both installation and mission datacenters (unclassified/classified) (network and server hardware), critical base information technology services (unclassified/classified), telephone voice over internet protocol and voice over secure internet protocol infrastructure. This includes fiber in the ground, conduit, and vaults. In addition, tech debt funds are required to decommission legacy hardware to include digital multiplier hardware and base central office infrastructure and hardware. Overall, these actions will reduce the U.S. Space Force’s tech debt, modernizing its technology by implementing a multi-pronged strategy focused on agile software acquisition, deep commercial sector collaboration, and significant investment in its digital infrastructure and personnel. This represents a fundamental shift away from traditional slow-moving defensive procurement processes toward a more dynamic and responsive “digital service” model. OP32: 914 Purchased Communications (Non-Fund) (FY 2026 Base: $15,939) 2) Facilities Operations Support - Cybersecurity ........................................................................................................................................ $15,000 Increase funds the mitigation of identified cyber vulnerabilities, modernizing critical infrastructure control systems in the missile defense system architecture, prioritizing Command and Control (C2), and data processing nodes. Additionally, this funding implements additional cyber security via contract modifications. OP32: 923 Operation and Maintenance of Facilities (FY 2026 Base: $49,126) 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 167 Exhibit OP-5, Subactivity Group 13Z === page 172 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) FY 2027 Budget Request....................................................................................................................................................................................................................... $550,911 168 Exhibit OP-5, Subactivity Group 13Z === page 173 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) IV. Performance Criteria and Evaluation Summary: Airfield Operations Support Base Operations Support Base Security and Law Enforcement Facilities Operations Support Supply and Transportation Utilities Total FY 2025 Actuals 677 39,385 96 79,281 11,000 108,536 238,975 FY 2026 Enacted 916 15,939 2,876 70,288 9,260 132,959 232,238 169 FY 2027 Request 942 315,780 2,947 82,072 14,099 135,071 550,911 Exhibit OP-5, Subactivity Group 13Z === page 174 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 0 0 0 0 0 0 0 0 0 0 0 0 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 1 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 170 0 0 170 415 301 376 75 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost Contractor FTEs (Total) 170 Exhibit OP-5, Subactivity Group 13Z === page 175 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 0 0 1.28% 0 0 0 0 0.28% 0 170 170 TOTAL CIVILIAN PERSONNEL COMPENSATION 0 0 0 0 0 0 0 170 170 TRAVEL OF PERSONS 11,515 0 288 812 12,615 0 265 -728 12,152 TOTAL TRAVEL 11,515 0 288 812 12,615 0 265 -728 12,152 26,664 0 1.10% 293 275 27,232 0 -7.08% -1,928 1,293 26,597 0 0 5.78% 0 47 47 0 4.54% 2 -1 48 5.79% 0.61% CIVILIAN PERSONNEL COMPENSATION 101 TRAVEL 308 2.50% 2.10% DWCF SUPPLIES AND MATERIALS 401 DLA ENERGY (FUEL PRODUCTS) 414 AIR FORCE CONSOLIDATED SUSTAINMENT AG (SUPPLY) AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 418 153 0 26,817 0 AIR FORCE FUND EQUIPMENT 61 0 TOTAL DWCF EQUIPMENT PURCHASES 61 0 DISN INFRASTRUCTURE SERVICES (DISN-IS) 0 0 TOTAL OTHER FUND PURCHASES 0 0 TOTAL DWCF SUPPLIES AND MATERIALS 9 944 1,106 0 302 1,266 28,385 0 2 -63 0 0 2 -63 0 0 0 0 0 0 0 0 0 0 7 1,338 2,451 -1,919 2,630 29,096 0 0 0 0 0 0 0 0 0 0 0 0 DWCF EQUIPMENT PURCHASES 505 2.50% 2.10% OTHER FUND PURCHASES 671 -8.00% 0.00% TRANSPORTATION 703 JCS EXERCISES 5,729 0 17.50% 1,003 -6,732 0 0 -19.64% 0 0 0 705 AMC CHANNEL CARGO 56 0 74.80% 42 -98 0 0 -1.99% 0 0 0 708 MSC CHARTERED CARGO 0 0 2.50% 0 1 1 0 2.10% 0 0 1 771 COMMERCIAL TRANSPORTATION 334 0 2.50% 8 580 922 0 2.10% 19 17 958 171 Exhibit OP-5, Subactivity Group 13Z === page 176 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Operating Forces Detail by Subactivity Group: Base Support ($ In Thousands) TOTAL TRANSPORTATION FY 2025 Program FC Rate Diff 6,119 0 Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff 1,053 -6,249 923 0 Price Growth Percent Price Growth Program Growth FY 2027 Program 19 17 959 OTHER PURCHASES 913 PURCHASED UTILITIES (NON-FUND) 88,076 3 2.50% 2,202 20,881 111,162 2 2.10% 2,334 783 114,281 914 PURCHASED COMMUNICATIONS (NON-FUND) 778 0 2.50% 19 -781 16 0 2.10% 0 299,861 299,877 915 RENTS (NON-GSA) 208 0 2.50% 5 621 834 0 2.10% 18 -76 776 917 POSTAL SERVICES (U.S.P.S) 0 0 2.50% 0 1 1 0 2.10% 0 0 1 920 SUPPLIES & MATERIALS (NON-FUND) 15,654 0 2.50% 391 -2,577 13,468 0 2.10% 283 76 13,827 921 PRINTING & REPRODUCTION 43 0 2.50% 1 104 148 0 2.10% 3 1 152 922 EQUIPMENT MAINTENANCE BY CONTRACT 2,774 0 2.50% 69 -1,678 1,165 0 2.10% 24 9 1,198 923 OPERATION AND MAINTENANCE OF FACILITIES 64,649 -6 2.50% 1,616 -7,361 58,898 85 2.10% 1,239 10,752 70,974 925 EQUIPMENT PURCHASES (NON-FUND) 6,215 0 2.50% 155 -2,213 4,157 0 2.10% 87 -29 4,215 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 962 0 2.50% 24 -984 2 0 2.10% 0 0 2 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 5,951 0 2.50% 149 -6,100 0 0 2.10% 0 0 0 933 STUDIES, ANALYSIS, & EVALUATIONS 75 0 2.50% 2 -77 0 0 2.10% 0 0 0 934 662 0 2.50% 17 -644 35 0 2.10% 1 2,754 2,790 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 2,857 0 2.50% 71 -2,894 34 0 2.10% 1 -1 34 937 LOCALLY PURCHASED FUEL (NON-FUND) 0 0 1.10% 0 37 37 0 -7.08% -3 6 40 955 MEDICAL CARE 447 0 4.00% 18 -465 0 0 3.90% 0 0 0 957 LAND AND STRUCTURES 437 0 2.50% 11 -448 0 0 2.10% 0 0 0 959 INSURANCE CLAIMS AND INDEMNITIES 0 0 2.50% 0 0 0 0 2.10% 0 0 0 960 INTEREST AND DIVIDENDS 40 0 2.50% 1 -41 0 0 2.10% 0 0 0 987 OTHER INTRA-GOVERNMENT PURCHASES 252 989 OTHER SERVICES 78 0 2.50% 2 166 246 0 2.10% 5 1 4,557 0 2.50% 114 -4,559 112 0 2.10% 2 1 115 TOTAL OTHER PURCHASES 194,463 -3 4,868 -9,013 190,315 87 3,995 314,137 508,534 GRAND TOTAL 238,975 -3 6,513 -13,247 232,238 87 2,360 316,226 550,911 172 Exhibit OP-5, Subactivity Group 13Z === page 177 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) I. Description of Operations Financed Logistics Operations currently contains one major program: Second Destination Transportation. Second Destination Transportation (SDT), provides the U.S. Space Force with worldwide transportation and distribution to remote locations inclusive of arctic locations. The program supports the distribution of mission-essential equipment and force sustainment goods. The operation is made up of two primary elements: A) SDT centrally-managed account provides for both contiguous U.S. (CONUS) and outside the CONUS (OCONUS) movement of non-defense working capital fund U.S. Space Force materiel, such as vehicles, and communications equipment between supply and repair facilities or base-to-base as directed by the item manager. B) Port readiness and traffic management provides the information technology and infrastructure at Surface Deployment and Distribution Command designated seaports for the loading and unloading of ocean going vessels transporting bulk cargo destined to, from, and between overseas locations. SDT includes over-ocean air (commercial and Air Mobility Command organic) and sealift (commercial and Surface Deployment and Distribution Command organic) to OCONUS warfighting commands. SDT funds overseas movement of subsistence items (supplies and field rations to dining facilities) for OCONUS units. II. Force Structure Summary Support Second Destination Transportation requirements for U.S. Space Force missions. 173 Exhibit OP-5, Subactivity Group 41A === page 178 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) III. Financial Summary ($ in Thousands): FY 2026 A. Program Elements LOGISTICS OPERATIONS SUBACTIVITY GROUP TOTAL FY 2025 Actuals $29,389 $29,389 Budget Request $35,889 $35,889 174 Amount $0 $0 Percent 0.00% 0.00% Appn $35,889 $35,889 Normalized Current Enacted $35,889 $35,889 FY 2027 Request $36,164 $36,164 Exhibit OP-5, Subactivity Group 41A === page 179 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $35,889 0 0 0 0 35,889 0 0 0 35,889 0 0 0 $35,889 $35,889 175 745 -470 0 $36,164 Exhibit OP-5, Subactivity Group 41A === page 180 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .....................................................................................................................................................................................................$35,889 1. Congressional Adjustments ............................................................................................................................................................................................................................. $0 a) Distributed Adjustments ............................................................................................................................................................................................................. $0 b) Undistributed Adjustments ......................................................................................................................................................................................................... $0 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ................................................................................................................................................................................................................$35,889 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 176 Exhibit OP-5, Subactivity Group 41A === page 181 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) FY 2026 Appropriated and Supplemental Funding ...............................................................................................................................................................................$35,889 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .......................................................................................................................................................................................................................$35,889 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate....................................................................................................................................................................................................$35,889 6. Price Change ............................................................................................................................................................................................................................................... $745 7. Transfers .................................................................................................................................................................................................................................................... $-470 a) Transfers In ................................................................................................................................................................................................................................ $0 b) Transfers Out ........................................................................................................................................................................................................................ $-470 177 Exhibit OP-5, Subactivity Group 41A === page 182 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) 1) Civilian Pay - Command and Control Manpower ........................................................................................................................................ $-470 Decrease transfers funding and manpower from Logistics Operations (Subactivity Group 41A, -$470, -5 FTEs), Global C3I & Early Warning (Subactivity Group 12A -$1,759, -17 FTEs), Education & Training (Subactivity Group 13E, -$9,320, -52 FTEs), Special Programs (Subactivity Group 13F, -$10,919, -54 FTEs) and Administration (Subactivity Group 42A, -$4,978, -27 FTEs) to Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) and Cyberspace Activities (Subactivity Group 13D, $8,261, 45 FTEs) to realign resources to support the mission requirements for the standup of Space Forces - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $470; FTE Base: 5; -5 FTE) 8. Program Increases .......................................................................................................................................................................................................................................... $0 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ...................................................................................................................................................................................................... $0 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 FY 2027 Budget Request..........................................................................................................................................................................................................................$36,164 178 Exhibit OP-5, Subactivity Group 41A === page 183 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) Second Destination Transportation (SDT) Major Commodity (Commodity Transported) Military Supplies & Equipment Total Major Commodity SDT FY 2025 Actuals Price Change Program Change FY 2026 Enacted Price Change Program Change FY 2027 Request $29,389.0 $29,389.0 $4,569.0 $4,569.0 $1,932.0 $1,932.0 $35,889.0 $35,889.0 $745.0 $745.0 $-470.0 $-470.0 $36,164.0 $36,164.0 179 Exhibit OP-5, Subactivity Group 41A === page 184 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 4 2 2 4 2 2 0 0 0 -4 -2 -2 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 0 0 0 0 0 0 5 5 5 0 5 0 0 0 0 0 0 0 -5 -5 -5 0 -5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost 0 0 0 0 0 93 0 0 0 0 0 -93 Contractor FTEs (Total) 0 0 0 0 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire Personnel Summary Explanations: 180 Exhibit OP-5, Subactivity Group 41A === page 185 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Logistics Operations ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 0 0 1.28% 0 467 467 0 0.28% 1 -468 0 TOTAL CIVILIAN PERSONNEL COMPENSATION 0 0 0 467 467 0 1 -468 0 DWCF SUPPLIES AND MATERIALS AIR FORCE RETAIL SUPPLY (GENERAL SUPPORT DIVISION) 0 0 0 0 0 0 0 0 0 TOTAL DWCF SUPPLIES AND MATERIALS 0 0 0 0 0 0 0 0 0 CIVILIAN PERSONNEL COMPENSATION 101 418 5.79% 0.61% TRANSPORTATION 703 JCS EXERCISES 15,242 0 17.50% 2,667 -17,909 0 0 -19.64% 0 0 0 719 SDDC CARGO OPERATION (PORT HANDLING) 6,585 0 26.00% 1,712 -8,297 0 0 -60.78% 0 0 0 771 COMMERCIAL TRANSPORTATION 7,562 0 2.50% 189 27,671 35,422 0 2.10% 744 -2 36,164 TOTAL TRANSPORTATION 29,389 0 4,569 1,465 35,422 0 744 -2 36,164 GRAND TOTAL 29,389 0 4,569 1,932 35,889 0 745 -470 36,164 181 Exhibit OP-5, Subactivity Group 41A === page 186 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) I. Description of Operations Financed: Administration funds the management headquarters program within U.S. Space Force, which includes personnel administration and operational programs in direct support of the space staff and secretariat. Funding includes the service acquisition executive for space systems and programs, Air Force Office of the Assistant Secretary for Space Acquisition and Integration, and the Office of the Chief of Space Operations (OCSO). This includes civilian personnel, technical/administrative mission support, staff functions and support activities. Personnel administration funds the military and civilian personnel operations of the U.S. Space Force enterprise human resources domain. This supports development of programs and processes for the recruitment, employment, organizational, professional development and retention of personnel to meet the Department of the Air Force (DAF) and U.S. Space Force manpower requirements. Operational programs carry out space, intelligence, logistics, cyber defense, and nuclear deterrence operations by establishing and overseeing policies to organize, train, and equip those forces for the U.S. Space Force and the DAF. This funding supports the OCSO by utilizing civilian and contractor expertise for the strategic planning of functions that will foster a dedicated space culture/ethos, which includes space doctrine development, space warfare tactics, techniques and procedure development, education and training functions, and personnel management. II. Force Structure Summary: This program provides funding to support the Office of the Chief of Space Operations and the Air Force Office of the Assistant Secretary for Space Acquisition and Integration. 182 Exhibit OP-5, Subactivity Group 42A === page 187 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) III. Financial Summary ($ in Thousands): A. Program Elements ADMINISTRATION SUBACTIVITY GROUP TOTAL FY 2026 FY 2025 Actuals $159,080 $159,080 Budget Request $184,753 $184,753 183 Amount $-15,884 $-15,884 Percent -8.60% -8.60% Appn $168,869 $168,869 Normalized Current Enacted $168,869 $168,869 FY 2027 Request $449,882 $449,882 Exhibit OP-5, Subactivity Group 42A === page 188 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) B. Reconciliation Summary BASELINE FUNDING Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) SUBTOTAL APPROPRIATED AMOUNT War-Related and Disaster Supplemental Appropriation X-Year Carryover (Supplemental) Fact-of-Life Changes (2026 to 2026 Only) SUBTOTAL BASELINE FUNDING Anticipated Reprogramming (Requiring 1415 Actions) Less: War-Related and Disaster Supplemental Appropriation Less: X-Year Carryover (Supplemental) Price Change Functional Transfers Program Changes NORMALIZED CURRENT ESTIMATE Change FY 2026/FY 2026 Change FY 2026/FY 2027 $184,753 -9,000 -6,884 0 0 168,869 0 0 0 168,869 0 0 0 $168,869 $168,869 184 2,209 -16,124 294,928 $449,882 Exhibit OP-5, Subactivity Group 42A === page 189 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) C. Reconciliation of Increases and Decreases: FY 2026 President's Budget Request .................................................................................................................................................................................................. $184,753 1. Congressional Adjustments .................................................................................................................................................................................................................. $-15,884 a) Distributed Adjustments ..................................................................................................................................................................................................... $-9,000 1) Unjustified Growth .................................................................................................................................................................................... $-9,000 b) Undistributed Adjustments ................................................................................................................................................................................................. $-6,884 1) Historical Unobligated Balances .............................................................................................................................................................. $-1,523 2) Program Decrease - Projected Overestimation of Civilian Compensation .............................................................................................. $-5,361 c) Adjustments to Meet Congressional Intent ................................................................................................................................................................................ $0 d) General Provisions ..................................................................................................................................................................................................................... $0 FY 2026 Appropriated Amount ............................................................................................................................................................................................................. $168,869 2. War-Related and Disaster Supplemental Appropriations ................................................................................................................................................................................ $0 a) Overseas Operations Funding ................................................................................................................................................................................................... $0 b) Military Construction and Emergency Hurricane ....................................................................................................................................................................... $0 c) X-Year Carryover (Supplemental) .............................................................................................................................................................................................. $0 3. Fact-of-Life Changes ....................................................................................................................................................................................................................................... $0 185 Exhibit OP-5, Subactivity Group 42A === page 190 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) a) Functional Transfers .................................................................................................................................................................................................................. $0 b) Technical Adjustments ............................................................................................................................................................................................................... $0 c) Emergent Requirements ............................................................................................................................................................................................................ $0 FY 2026 Appropriated and Supplemental Funding ............................................................................................................................................................................ $168,869 4. Anticipated Reprogramming (Requiring 1415 Actions) ................................................................................................................................................................................... $0 a) Increases .................................................................................................................................................................................................................................... $0 b) Decreases .................................................................................................................................................................................................................................. $0 Revised FY 2026 Estimate .................................................................................................................................................................................................................... $168,869 5. Less: Emergency Supplemental Funding ........................................................................................................................................................................................................ $0 a) Less: War-Related and Disaster Supplemental Appropriation .................................................................................................................................................. $0 b) Less: X-Year Carryover (Supplemental) .................................................................................................................................................................................... $0 Normalized FY 2026 Current Estimate................................................................................................................................................................................................. $168,869 6. Price Change ............................................................................................................................................................................................................................................$2,209 7. Transfers ............................................................................................................................................................................................................................................... $-16,124 a) Transfers In ................................................................................................................................................................................................................................ $0 b) Transfers Out ................................................................................................................................................................................................................... $-16,124 186 Exhibit OP-5, Subactivity Group 42A === page 191 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) 1) Civilian Pay - Civilian Manpower Realignment ........................................................................................................................................ $-8,480 Decrease transfers funding and manpower from Administration (Subactivity Group 42A, -$8,480, -40 FTEs) and Special Programs (Subactivity Group 13F, -$2,120, -10 FTEs) to U.S. Air Force, to fund organic civilian professional manpower previously provided by advisory and assistance service contract support. This action effectively aligns Department of Air Force resources directly supporting the Secretary of the Air Force. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346; -40 FTE) 2) Civilian Pay - Command and Control Manpower ..................................................................................................................................... $-4,978 Decrease transfers funding and manpower from Administration (Subactivity Group 42A, -$4,978, -27 FTEs), Global C3I & Early Warning (Subactivity Group 12A -$1,759, -17 FTEs), Education & Training (Subactivity Group 13E, -$9,320, -52 FTEs), Special Programs (Subactivity Group 13F, -$10,919, -54 FTEs) and Logistics Operations (Subactivity Group 41A, -$470, -5 FTEs) to Space Operations (Subactivity Group 13C, $21,457, 103 FTEs) and Cyberspace Activities (Subactivity Group 13D, $8,261, 45 FTEs) to realign resources to support the mission requirements for the standup of Space Forces - Space as a Component Field Command. Manpower will support command and control of combat operations, strategic planning, ISR, and SATCOM integrated operations. The transfer enables achievement of theater and global objectives. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346; -27 FTE) 187 Exhibit OP-5, Subactivity Group 42A === page 192 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) 3) Civilian Pay - National Space Intelligence Center Manpower ................................................................................................................. $-2,666 Decrease transfers funding and manpower from Administration (Subactivity Group 42A, -$2,666, -24 FTEs) to Global C3I & Early Warning (Subactivity Group 12A, +$572, 6 FTEs) and Space Operations (Subactivity Group 13C, +$1,528, 18 FTEs). This transfer realigns manpower to meet USSF security requirements to support National Space Intelligence Center (NSIC). NSIC is one of the primary sources of intel within the USSF, utilized to accurately target, track and assess foreign space capabilities and emerging threats across the space domain. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346; -24 FTE) 8. Program Increases .............................................................................................................................................................................................................................. $294,928 a) Annualization of New FY 2026 Program .................................................................................................................................................................................... $0 b) One-Time FY 2027 Costs .......................................................................................................................................................................................................... $0 c) Program Growth in FY 2027 ........................................................................................................................................................................................... $294,928 1) Chief of Space Operations – Fix Integrated Security Enterprise ............................................................................................................ $16,426 Increase supports further growth of the U.S. Space Force intelligence community through training, certifications, and IT purchasing. Investment in preparing Guardians for a wide variety of readiness requirements directly supports and protects warfighters across the enterprise. OP32: 308 Travel of Persons 920 Supplies & Materials (Non-Fund) 925 Equipment Purchases (Non-Fund) (FY 2026 Base: $62,630) 188 Exhibit OP-5, Subactivity Group 42A === page 193 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) 2) Chief of Space Operations - Targeting Weaponeering Course .............................................................................................................. $12,430 Increase funds the study and course stand-up of a U.S. Space Force Weaponeering course. The training matures the U.S. Space Force's targeting processes to produce a unified methodology for technical training and skillsets for integration of space weapon systems into the joint targeting processes. This course coordinates planning efforts with Combatant Commands and Component Field Commands. This increase improves student throughput by funding training course standup, system integration, training classroom facilities, associated equipment and software licenses. OP32: 308 Travel of Persons (FY 2026 Base: $62,630) 3) Civilian Pay - Average Workyear Cost Adjustment................................................................................................................................... $4,367 Increase in Civilian Personnel compensation adjusts average workyear costs. Each year U.S. Space Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The Subactivity Group average cost adjustment is a result of these changes as well as updated pay raise, awards and benefit assumptions. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346) 4) Civilian Pay - Enhanced Performance Award Pool for DoW Civilian Employees ........................................................................................ $386 Increased funding strengthens the Department's ability to recognize and reward the civilian workforce whose expertise and continuity underpin mission success. Expanded award capacity helps retain the talent that sustains warfighter readiness, drives innovation, and ensures uninterrupted support across the enterprise. Investing in civilian recognition directly reinforces the workforce that delivers stability, operation excellence, and long-term capability for the Department. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346) 189 Exhibit OP-5, Subactivity Group 42A === page 194 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) 5) Civilian Pay - Support Squadron Standup ............................................................................................................................................ $243,694 Increase half-year funding and manpower (1,531 FTEs) enables the Space Force to grow Guardian civilians by 7,570 by FY 2031. The growth effort leads stand-up of 4 operations centers and the support of critical manpower resources for maintenance, support, and engineering teams. Ensuring the necessary personnel are in place to meet mission requirements and sustain investments in resilient operations through Future Operationally Resilient Ground Evolution (FORGE), Defensive Cyber Operations-Space (DCO-S), Electronic Warfare, Missile Warning/Missile Tracking. OP32: 101 Executive General Schedule (FY 2026 Base: $73,580; FTE Base: 346; 1,531 FTE) 6) Space Support - Personnel and Financial Systems ............................................................................................................................... $17,625 This funding increase is critical for the Space Force to accelerate the modernization of its Human Resources (HR) systems. These activities are essential to meet the data exchange protocols, quality standards, and Standard Financial Information Structure (SFIS) requirements mandated by DFAS, directly enabling the Department of War (DoW) to achieve its goal of full auditability. OP32: 932 Management & Professional Support Services (FY 2026 Base: $32,659) 9. Program Decreases ......................................................................................................................................................................................................................................... $0 a) One-Time FY 2026 Costs .......................................................................................................................................................................................................... $0 b) Annualization of FY 2026 Program Decreases .......................................................................................................................................................................... $0 c) Program Decreases in FY 2027 ................................................................................................................................................................................................. $0 FY 2027 Budget Request....................................................................................................................................................................................................................... $449,882 190 Exhibit OP-5, Subactivity Group 42A === page 195 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) IV. Performance Criteria and Evaluation Summary Funding supports the day-to-day operations of the U.S. Space Force headquarters military, civilian and contractor workforce. Please refer to Part 5, Personnel Summary, for details. 191 Exhibit OP-5, Subactivity Group 42A === page 196 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) V. Personnel Summary: FY 2025 FY 2026 FY 2027 Change FY 2026/2027 Active Military End Strength (E/S) (Total) Officer Enlisted 466 193 273 404 180 224 2,417 1,359 1,058 2,013 1,179 834 Civilian FTEs (Total) DIRECT FUNDED (DOES NOT INCLUDE MILITARY TECHNICIANS) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 301 301 301 0 301 0 346 346 346 0 346 0 1,786 1,786 1,786 0 1,786 0 1,440 1,440 1,440 0 1,440 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MILITARY TECHNICIANS U.S. Direct Hire Annual Civilian Salary Cost 0 0 228 0 0 212 0 0 171 0 0 -41 Contractor FTEs (Total) 380 400 529 129 REIMBURSABLE FUNDED U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 192 Exhibit OP-5, Subactivity Group 42A === page 197 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) VII. OP-32A Line Items: FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 305,661 CIVILIAN PERSONNEL COMPENSATION 101 EXECUTIVE, GENERAL AND SPECIAL SCHEDULES 68,549 0 1.28% 877 4,034 73,460 0 0.28% 206 231,995 103 WAGE BOARD 0 0 1.28% 0 0 0 0 0.28% 0 0 0 110 UNEMPLOYMENT COMPENSATION 0 0 2.90% 0 120 120 0 2.10% 3 -1 122 68,549 0 877 4,154 73,580 0 208 231,995 305,783 TRAVEL OF PERSONS 3,522 0 88 -1,077 2,533 0 53 16,989 19,575 TOTAL TRAVEL 3,522 0 88 -1,077 2,533 0 53 16,989 19,575 TOTAL CIVILIAN PERSONNEL COMPENSATION TRAVEL 308 2.50% 2.10% OTHER FUND PURCHASES 633 DLA DOCUMENT SERVICES 75 0 0.02% 0 -75 0 0 3.30% 0 0 0 672 PRMRF PURCHASES 2,383 0 -6.46% -154 -2,229 0 0 2.30% 0 0 0 TOTAL OTHER FUND PURCHASES 2,458 0 -154 -2,304 0 0 0 0 0 TRANSPORTATION 703 JCS EXERCISES 0 0 17.50% 0 0 0 0 -19.64% 0 0 0 719 SDDC CARGO OPERATION (PORT HANDLING) 0 0 26.00% 0 0 0 0 -60.78% 0 0 0 771 COMMERCIAL TRANSPORTATION 0 0 2.50% 0 0 0 0 2.10% 0 0 0 TOTAL TRANSPORTATION 0 0 0 0 0 0 0 0 0 8,335 OTHER PURCHASES 914 PURCHASED COMMUNICATIONS (NON-FUND) 917 POSTAL SERVICES (U.S.P.S) 1,618 0 2.50% 40 6,389 8,047 0 2.10% 169 119 0 0 2.50% 0 60 60 0 2.10% 1 0 920 SUPPLIES & MATERIALS (NON-FUND) 61 919 0 2.50% 23 2,879 3,821 0 2.10% 80 2,878 6,779 921 PRINTING & REPRODUCTION 0 0 2.50% 0 569 569 0 2.10% 12 3 584 922 923 EQUIPMENT MAINTENANCE BY CONTRACT 9,976 0 2.50% 249 -10,020 205 0 2.10% 4 2 211 OPERATION AND MAINTENANCE OF FACILITIES 2,152 0 2.50% 54 -2,206 0 0 2.10% 0 0 925 EQUIPMENT PURCHASES (NON-FUND) 0 254 0 2.50% 6 18 278 0 2.10% 6 2,671 2,955 193 Exhibit OP-5, Subactivity Group 42A === page 198 === DEPARTMENT OF THE AIR FORCE Fiscal Year (FY) 2027 Budget Operation and Maintenance, Space Force Budget Activity: Administration and Servicewide Activities Detail by Subactivity Group: Administration ($ In Thousands) FY 2025 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2026 Program FC Rate Diff Price Growth Percent Price Growth Program Growth FY 2027 Program 0 0 2.50% 0 4,586 4,586 0 2.10% 96 718 5,400 927 AIR DEFENSE CONTRACTS & SPACE SUPPORT (AF) 932 MANAGEMENT & PROFESSIONAL SUPPORT SERVICES 29,339 0 2.50% 733 -20,595 9,477 0 2.10% 199 18,222 27,898 933 STUDIES, ANALYSIS, & EVALUATIONS 22,355 0 2.50% 559 -22,914 0 0 2.10% 0 0 0 934 5,965 0 2.50% 149 -6,114 0 0 2.10% 0 0 0 935 ENGINEERING & TECHNICAL SERVICES TRAINING AND LEADERSHIP DEVELOPMENT (ADVISORY & ASSISTANCE SERVICES) 100 0 2.50% 3 6,155 6,257 0 2.10% 131 -582 5,806 957 LAND AND STRUCTURES 5,275 0 2.50% 132 -5,407 0 0 2.10% 0 0 0 985 RESEARCH AND DEVELOPMENT CONTRACTS 3,799 0 2.50% 95 -3,894 0 0 2.10% 0 0 0 987 OTHER INTRA-GOVERNMENT PURCHASES 399 0 2.50% 10 -409 0 0 2.10% 0 0 0 989 OTHER SERVICES 2,400 0 2.50% 60 56,996 59,456 0 2.10% 1,249 5,790 66,495 TOTAL OTHER PURCHASES 84,551 0 2,114 6,091 92,756 0 1,948 29,820 124,524 GRAND TOTAL 159,080 0 2,925 6,864 168,869 0 2,209 278,804 449,882 194 Exhibit OP-5, Subactivity Group 42A