=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 1 of 1 Weapons Procurement, Navy UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Navy.................................................................................................................................................................................... Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Cost of Report............................................................................................................................................................. Volume 1 - v Introduction and Explanation of Contents..............................................................................................................Volume 1 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - ix Line Item Table of Contents (by Appropriation then Line Number).................................................................. Volume 1 - xxix Line Item Table of Contents (Alphabetically by Line Item Title)...................................................................... Volume 1 - xxxiii Executive Summary.............................................................................................................................................Volume 1 - xxxvii Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === The estimated cost of this report for the Department of the Navy (DON) is $95,718. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === Department of Defense Appropriations Act, 2027 Weapons Procurement, Navy For construction, procurement, production, modification, and modernization of missiles, torpedoes, other weapons, and related support equipment including spare parts, and accessories therefore; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $11,769,111,000 to remain available for obligation until September 30, 2029. Volume 1 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary Apr 2026 (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total 7,107,701 6,086,954 4,063,652 10,150,606 Total Department of the Navy 7,107,701 6,086,954 4,063,652 10,150,606 Grand Total Department of War 7,107,701 6,086,954 4,063,652 10,150,606 Appropriation Summary FY 2025 Actuals Weapons Procurement, Navy UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary Apr 2026 (Dollars in Thousands) Appropriation Summary Weapons Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 11,769,111 10,850,204 22,619,315 Total Department of the Navy 11,769,111 10,850,204 22,619,315 Grand Total Department of War 11,769,111 10,850,204 22,619,315 UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary Apr 2026 (Dollars in Thousands) Appropriation Summary FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total 7,107,701 6,086,954 4,063,652 10,150,606 7,107,701 6,086,954 4,063,652 10,150,606 FY 2025 Actuals Weapons Procurement, Navy Total Department of the Navy UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary Apr 2026 (Dollars in Thousands) Appropriation Summary Weapons Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 11,769,111 10,850,204 22,619,315 11,769,111 10,850,204 22,619,315 UNCLASSIFIED Volume 1 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Budget Activity Summary Apr 2026 (Dollars in Thousands) Appropriation: Weapons Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ballistic missiles 1,802,000 2,541,712 610,000 3,151,712 02. Other missiles 4,111,975 2,896,925 2,424,269 5,321,194 03. Torpedoes and related equipment 741,202 259,019 1,029,383 1,288,402 04. Other weapons 211,827 186,873 186,873 06. Spares and repair parts 240,697 202,425 202,425 7,107,701 6,086,954 Total Weapons Procurement, Navy UNCLASSIFIED 4,063,652 10,150,606 Volume 1 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Budget Activity Summary Apr 2026 (Dollars in Thousands) Appropriation: Weapons Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ballistic missiles 4,662,654 02. Other missiles 5,542,791 03. Torpedoes and related equipment 1,224,543 1,224,543 04. Other weapons 171,881 171,881 06. Spares and repair parts 167,242 167,242 Total Weapons Procurement, Navy 11,769,111 UNCLASSIFIED 4,662,654 10,850,204 10,850,204 16,392,995 22,619,315 Volume 1 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ballistic missiles Ballistic Missiles 1 Conventional Prompt Strike Modification of Missiles 2 Trident II Mods U 1,793,867 2,541,712 610,000 3,151,712 1,802,000 2,541,712 610,000 3,151,712 95,940 7,193 Support Equipment & Facilities 3 Missile Industrial Facilities A U 8,133 Total Ballistic missiles Budget Activity 02: Other missiles Strategic Missiles 4 Tomahawk A U 20 55 250,421 55 257,614 Tactical Missiles UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ballistic missiles Ballistic Missiles 1 Conventional Prompt Strike 12 750,387 12 750,387 Modification of Missiles 2 Trident II Mods U 3,912,267 3,912,267 4,662,654 4,662,654 Support Equipment & Facilities 3 Missile Industrial Facilities A U Total Ballistic missiles Budget Activity 02: Other missiles Strategic Missiles 4 Tomahawk A U 58 1,015,106 727 1,993,803 785 3,008,909 Tactical Missiles UNCLASSIFIED Volume 1 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost 5 AMRAAM A U 155 207,093 41 69,913 6 Sidewinder A U 608 295,280 146 84,713 7 Joint Advance Tactical Missile (JATM) A U 8 Standard Missile A U Cost Qty 50,000 102 (788,223) 55 (470,278) (-117,547) (-107,903) 670,676 362,375 Cost 41 69,913 146 134,713 301,858 Less: Advance Procurement (PY) 9 Qty FY 2026 Total 301,858 111 (1,048,000) 166 (1,518,278) (-107,903) 1,048,000 1,410,375 Standard Missile Advance Procurement (CY) 107,830 C (FY 2025 for FY 2026) (M) 10 Small Diameter Bomb II 11 Ram 12 13 (107,830) U 262 79,283 245 78,892 A U 148 145,268 123 122,372 MSE Missile A U Joint Air Ground Missile (JAGM) A U 175 55,315 277 74,152 UNCLASSIFIED 18,000 245 78,892 123 140,372 277 74,152 Volume 1 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost 5 AMRAAM A U 106 167,439 6 Sidewinder A U 306 174,750 7 Joint Advance Tactical Missile (JATM) A U 8 Standard Missile A U FY 2027 Mandatory Request Qty 388 557,806 106 (733,159) Cost 636,846 FY 2027 Total Qty 494 804,285 306 174,750 716,275 434 (3,599,221) Cost 1,274,081 540 (4,332,380) Less: Advance Procurement (PY) 733,159 9 3,599,221 4,332,380 Standard Missile Advance Procurement (CY) C (FY 2025 for FY 2026) (M) 10 Small Diameter Bomb II U 512 166,688 512 166,688 11 Ram A U 116 119,166 116 119,166 12 MSE Missile A U 23 97,835 405 1,730,823 13 Joint Air Ground Missile (JAGM) A U 282 73,226 282 73,226 382 UNCLASSIFIED 1,632,988 Volume 1 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 15 Aerial Targets A U 180,233 182,704 182,704 16 Other Missile Support A U 3,411 3,490 3,490 17 LRASM A U 164 597,530 136 656,724 18 Naval Strike Missile (NSM) A U 10 (33,695) 16 (36,075) Less: Advance Procurement (PY) 19 64 350,000 200 1,006,724 16 (36,075) (-3,837) (-3,837) (-3,837) 29,858 32,238 32,238 4,412 3,059 3,059 C (FY 2026 for FY 2027) (M) (2,103) (2,103) C (FY 2026 for FY 2028) (M) (956) (956) Naval Strike Missile (NSM) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (2,686) C (FY 2025 for FY 2027) (M) (959) C (FY 2025 for FY 2028) (M) (767) C (FY 2027 for FY 2028) (M) 20 Multi-mission Affordable Capacity Effector (MACE) A U 44,000 UNCLASSIFIED 44,000 Volume 1 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 15 Aerial Targets A U 179,931 179,931 16 Other Missile Support A U 3,877 3,877 17 LRASM A U 129 670,456 18 Naval Strike Missile (NSM) A U 32 (79,801) Less: Advance Procurement (PY) 19 48 236,389 177 906,845 32 (79,801) (-3,829) (-3,829) 75,972 75,972 2,103 2,103 (2,103) (2,103) Naval Strike Missile (NSM) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2025 for FY 2028) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) C (FY 2027 for FY 2028) (M) 20 Multi-mission Affordable Capacity Effector (MACE) A U 353 UNCLASSIFIED 156,000 353 156,000 Volume 1 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature Precision Attack Strike Munition 21 (PASM) FY 2025 Actuals Ident Code Sec A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Modification of Missiles 22 Tomahawk Mods A U 23 ESSM A U 374 624,821 305 503,381 305 503,381 24 AARGM-ER A U 157 (226,486) 99 (227,817) 99 (227,817) Less: Advance Procurement (PY) 25 285,157 6,283 473,848 480,131 (-33,273) (-34,604) (-34,604) 193,213 193,213 193,213 34,604 24,284 24,284 (24,284) (24,284) AARGM-ER Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (34,604) C (FY 2026 for FY 2027) (M) C (FY 2027 for FY 2028) (M) 26 Standard Missiles Mods A U 109,267 25,800 25,800 A U 81,490 127,222 127,222 Support Equipment & Facilities 27 Weapons Industrial Facilities UNCLASSIFIED Volume 1 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature Precision Attack Strike Munition 21 (PASM) FY 2027 Discretionary Request Ident Code Sec A U Qty Cost 4 FY 2027 Mandatory Request Qty Cost 4,019 FY 2027 Total Qty Cost 4 4,019 Modification of Missiles 22 Tomahawk Mods A U 23 ESSM A U 24 AARGM-ER A U Less: Advance Procurement (PY) 25 799,139 290 521,006 724,675 1,523,814 290 521,006 (24,304) (24,304) (-24,284) (-24,284) 20 20 5,210 5,210 (5,210) (5,210) AARGM-ER Advance Procurement (CY) C (FY 2025 for FY 2026) (M) C (FY 2026 for FY 2027) (M) C (FY 2027 for FY 2028) (M) 26 Standard Missiles Mods A U 69,579 69,579 A U 62,403 62,403 Support Equipment & Facilities 27 Weapons Industrial Facilities UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature 28 Industrial Preparedness FY 2025 Actuals Ident Code Sec A U A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 190,000 190,000 2,424,269 5,321,194 Ordnance Support Equipment 29 Ordnance Support Equipment Total Other missiles 311,294 37,059 4,111,975 2,896,925 4,317 4,789 352,047 4,581 37,059 Budget Activity 03: Torpedoes and related equipment Torpedoes and Related Equip 30 SSTD A U 31 MK-48 Torpedo A U 32 ASW Targets A U 30,476 38,386 85 4,789 63 381,240 63 385,821 38,386 Mod of Torpedoes and Related Equip 33 MK-54 Torpedo Mods A U 81,614 16,692 111,821 128,513 34 MK-48 Torpedo ADCAP Mods A U 17,363 31,479 28,760 60,239 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature 28 Industrial Preparedness FY 2027 Discretionary Request Ident Code Sec A U A U Qty Cost FY 2027 Mandatory Request Qty 640 Cost FY 2027 Total Qty Cost 1,154,007 1,154,647 10,850,204 16,392,995 Ordnance Support Equipment 29 Ordnance Support Equipment 43,261 Total Other missiles 5,542,791 43,261 Budget Activity 03: Torpedoes and related equipment Torpedoes and Related Equip 30 SSTD A U 3,969 31 MK-48 Torpedo A U 32 ASW Targets A U 47,277 47,277 141 571,274 3,969 141 571,274 Mod of Torpedoes and Related Equip 33 MK-54 Torpedo Mods A U 112,126 112,126 34 MK-48 Torpedo ADCAP Mods A U 67,279 67,279 UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature 35 Maritime Mines FY 2025 Actuals Ident Code Sec B U 100,022 Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost 507,562 FY 2026 Total Qty Cost 507,562 Support Equipment 36 Torpedo Support Equipment A U 145,655 153,418 153,418 37 ASW Range Support A U 4,039 4,328 4,328 A U 5,669 5,346 5,346 741,202 259,019 Destination Transportation 38 First Destination Transportation Total Torpedoes and related equipment 1,029,383 1,288,402 Budget Activity 04: Other weapons Guns and Gun Mounts 39 Small Arms and Weapons A U 21,318 9,987 9,987 A U 5,118 8,122 8,122 Modification of Guns and Gun Mounts 40 CIWS Mods UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature 35 Maritime Mines FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Ident Code Sec B U 251,724 251,724 Qty Cost Qty Cost Qty Cost Support Equipment 36 Torpedo Support Equipment A U 160,445 160,445 37 ASW Range Support A U 4,438 4,438 A U 6,011 6,011 1,224,543 1,224,543 Destination Transportation 38 First Destination Transportation Total Torpedoes and related equipment Budget Activity 04: Other weapons Guns and Gun Mounts 39 Small Arms and Weapons A U 13,946 13,946 A U 7,939 7,939 Modification of Guns and Gun Mounts 40 CIWS Mods UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 41 Coast Guard Weapons A U 44,718 44,455 44,455 42 Gun Mount Mods A U 122,246 107,696 107,696 43 LCS Module Weapons B U 44 Airborne Mine Neutralization Systems A U 11,635 Cancelled Account Adjustments A U 354 42 6,438 10 2,200 10 2,200 14,413 14,413 211,827 186,873 186,873 Other 45 Total Other weapons Budget Activity 06: Spares and repair parts Spares and Repair Parts 46 240,697 202,425 202,425 Total Spares and repair parts Spares and Repair Parts A U 240,697 202,425 202,425 Total Weapons Procurement, Navy 7,107,701 6,086,954 UNCLASSIFIED 4,063,652 10,150,606 Volume 1 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1507N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1507 Weapons Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 41 Coast Guard Weapons A U 49,537 49,537 42 Gun Mount Mods A U 84,004 84,004 43 LCS Module Weapons B U 44 Airborne Mine Neutralization Systems A U Cancelled Account Adjustments A U 10 2,190 10 2,190 14,265 14,265 171,881 171,881 167,242 167,242 167,242 167,242 Other 45 Total Other weapons Budget Activity 06: Spares and repair parts Spares and Repair Parts 46 Spares and Repair Parts Total Spares and repair parts Total Weapons Procurement, Navy A U 11,769,111 UNCLASSIFIED 10,850,204 22,619,315 Volume 1 - xxviii === page 31 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 1160 Conventional Prompt Strike................................................................................................................... Volume 1 - 1 2 01 02 1250 TRIDENT II Mods.................................................................................................................................. Volume 1 - 9 3 01 03 1350 Missile Industrial Facilities................................................................................................................... Volume 1 - 51 Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 4 02 01 2101 Tomahawk............................................................................................................................................Volume 1 - 55 5 02 02 2206 AMRAAM..............................................................................................................................................Volume 1 - 71 6 02 02 2209 Sidewinder............................................................................................................................................Volume 1 - 83 7 02 02 2210 Joint Advance Tactical Missile (JATM).............................................................................................. Volume 1 - 105 8 02 02 2234 Standard Missile.................................................................................................................................Volume 1 - 107 9 02 02 2234 Standard Missile, Advance Procurement...........................................................................................Volume 1 - 131 10 02 02 2238 Small Diameter Bomb II (SDB II)...................................................................................................... Volume 1 - 135 UNCLASSIFIED Volume 1 - xxix === page 32 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 11 02 02 2242 Rolling Airframe Missile (RAM)..........................................................................................................Volume 1 - 147 12 02 02 2247 MSE Missile....................................................................................................................................... Volume 1 - 161 13 02 02 2248 Joint Air Ground Missile (JAGM)....................................................................................................... Volume 1 - 165 15 02 02 2280 Aerial Targets.....................................................................................................................................Volume 1 - 175 16 02 02 2290 Other Missile Support........................................................................................................................ Volume 1 - 201 17 02 02 2291 LRASM............................................................................................................................................... Volume 1 - 205 18 02 02 2292 Naval Strike Missile (NSM)................................................................................................................ Volume 1 - 225 19 02 02 2292 Naval Strike Missile (NSM), Advance Procurement.......................................................................... Volume 1 - 239 20 02 02 2294 Multi-mission Affordable Capacity Effector (MACE).......................................................................... Volume 1 - 243 21 02 02 2295 Precision Attack Strike Munition (PASM)...........................................................................................Volume 1 - 245 22 02 03 2301 Tomahawk Mods................................................................................................................................Volume 1 - 249 23 02 03 2307 Evolved Sea Sparrow Missile (ESSM).............................................................................................. Volume 1 - 265 24 02 03 2327 AARGM-ER........................................................................................................................................ Volume 1 - 283 25 02 03 2327 AARGM-ER, Advance Procurement.................................................................................................. Volume 1 - 307 26 02 03 2356 Standard Missiles Mods.....................................................................................................................Volume 1 - 311 27 02 04 2420 Weapons Industrial Facilities............................................................................................................. Volume 1 - 323 28 02 04 2421 Industrial Preparedness..................................................................................................................... Volume 1 - 327 29 02 05 2500 Ordnance Support Equipment........................................................................................................... Volume 1 - 329 UNCLASSIFIED Volume 1 - xxx === page 33 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 30 03 01 3113 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 1 - 333 31 03 01 3117 MK-48 Torpedo.................................................................................................................................. Volume 1 - 339 32 03 01 3141 ASW Targets......................................................................................................................................Volume 1 - 369 33 03 02 3215 MK-54 Torpedo Mods........................................................................................................................ Volume 1 - 385 34 03 02 3225 MK-48 Torpedo ADCAP Mods...........................................................................................................Volume 1 - 409 35 03 02 3231 Maritime Mines...................................................................................................................................Volume 1 - 425 36 03 03 3301 Torpedo Support Equipment..............................................................................................................Volume 1 - 443 37 03 03 3302 ASW Range Support......................................................................................................................... Volume 1 - 481 38 03 04 2410 First Destination Transportation......................................................................................................... Volume 1 - 485 Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 39 04 01 4129 Small Arms and Weapons................................................................................................................. Volume 1 - 489 40 04 02 4205 Close-In Wpns Sys (CIWS) Mods..................................................................................................... Volume 1 - 509 UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 41 04 02 4206 Coast Guard Weapons...................................................................................................................... Volume 1 - 519 42 04 02 4217 Gun Mount Mods............................................................................................................................... Volume 1 - 543 43 04 02 4221 LCS Module Weapons....................................................................................................................... Volume 1 - 557 44 04 02 4225 Airborne Mine Neutralization Systems...............................................................................................Volume 1 - 565 Appropriation 1507N: Weapons Procurement, Navy Line # BA BSA Line Item Number Line Item Title 46 06 01 Spares and Repair Parts................................................................................................................... Volume 1 - 575 6120 Page UNCLASSIFIED Volume 1 - xxxii === page 35 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AARGM-ER 2327 24 02 03................... Volume 1 - 283 AARGM-ER, Advance Procurement 2327 25 02 03................... Volume 1 - 307 AMRAAM 2206 5 02 02..................... Volume 1 - 71 ASW Range Support 3302 37 03 03................... Volume 1 - 481 ASW Targets 3141 32 03 01................... Volume 1 - 369 Aerial Targets 2280 15 02 02................... Volume 1 - 175 Airborne Mine Neutralization Systems 4225 44 04 02................... Volume 1 - 565 Close-In Wpns Sys (CIWS) Mods 4205 40 04 02................... Volume 1 - 509 Coast Guard Weapons 4206 41 04 02................... Volume 1 - 519 Conventional Prompt Strike 1160 1 01 01....................... Volume 1 - 1 Evolved Sea Sparrow Missile (ESSM) 2307 23 02 03................... Volume 1 - 265 First Destination Transportation 2410 38 03 04................... Volume 1 - 485 Gun Mount Mods 4217 42 04 02................... Volume 1 - 543 Industrial Preparedness 2421 28 02 04................... Volume 1 - 327 Joint Advance Tactical Missile (JATM) 2210 7 02 02................... Volume 1 - 105 Joint Air Ground Missile (JAGM) 2248 13 02 02................... Volume 1 - 165 LCS Module Weapons 4221 43 04 02................... Volume 1 - 557 UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LRASM 2291 17 02 02................... Volume 1 - 205 MK-48 Torpedo 3117 31 03 01................... Volume 1 - 339 MK-48 Torpedo ADCAP Mods 3225 34 03 02................... Volume 1 - 409 MK-54 Torpedo Mods 3215 33 03 02................... Volume 1 - 385 MSE Missile 2247 12 02 02................... Volume 1 - 161 Maritime Mines 3231 35 03 02................... Volume 1 - 425 Missile Industrial Facilities 1350 3 01 03..................... Volume 1 - 51 Multi-mission Affordable Capacity Effector (MACE) 2294 20 02 02................... Volume 1 - 243 Naval Strike Missile (NSM) 2292 18 02 02................... Volume 1 - 225 Naval Strike Missile (NSM), Advance Procurement 2292 19 02 02................... Volume 1 - 239 Ordnance Support Equipment 2500 29 02 05................... Volume 1 - 329 Other Missile Support 2290 16 02 02................... Volume 1 - 201 Precision Attack Strike Munition (PASM) 2295 21 02 02................... Volume 1 - 245 Rolling Airframe Missile (RAM) 2242 11 02 02................... Volume 1 - 147 Sidewinder 2209 6 02 02..................... Volume 1 - 83 Small Arms and Weapons 4129 39 04 01................... Volume 1 - 489 Small Diameter Bomb II (SDB II) 2238 10 02 02................... Volume 1 - 135 Spares and Repair Parts 6120 46 06 01................... Volume 1 - 575 Standard Missile 2234 8 02 02................... Volume 1 - 107 Standard Missile, Advance Procurement 2234 9 02 02................... Volume 1 - 131 UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Standard Missiles Mods 2356 26 02 03................... Volume 1 - 311 Surface Ship Torpedo Def (SSTD) 3113 30 03 01................... Volume 1 - 333 TRIDENT II Mods 1250 2 01 02....................... Volume 1 - 9 Tomahawk 2101 4 02 01..................... Volume 1 - 55 Tomahawk Mods 2301 22 02 03................... Volume 1 - 249 Torpedo Support Equipment 3301 36 03 03................... Volume 1 - 443 Weapons Industrial Facilities 2420 27 02 04................... Volume 1 - 323 UNCLASSIFIED Volume 1 - xxxv === page 38 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxxvi === page 39 === Executive Summary for Weapons Procurement, Navy Table 1: Funding Overview FY 2025 ($K) Discretionary $ 7,107,701 Mandatory $ $ 7,107,701 Total BLI 1250 2101 2101 2206 2209 2210 2210 2234 2234 2234 2242 2247 2291 2291 2292 2294 2294 2301 2301 2327 2420 2421 2421 3117 3215 3225 3231 Mandatory Total FY 2026 ($K) FY 2027 ($K) $ 6,086,954 $ 11,769,111 $ 4,063,652 $ 10,850,204 $ 10,150,606 $ 22,619,315 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title FY 2025 ($K) Nuclear $ Munitions $ Munitions & Supply Chain $ Munitions $ Munitions & Supply Chain $ Munitions $ Munitions & Supply Chain $ Maritime Superiority $ Munitions $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions $ Munitions $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions $ Munitions & Supply Chain $ Munitions $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions & Supply Chain $ Munitions & Supply Chain $ $ - FY 2026 ($K) $ 610,000 $ $ 250,421 $ $ 50,000 $ $ $ $ $ 1,048,000 $ 18,000 $ $ $ 350,000 $ $ $ 44,000 $ $ 473,848 $ $ $ $ 190,000 $ 381,240 $ 111,821 $ 28,760 $ 507,562 $ 4,063,652 FY 2027 ($K) $ $ 1,993,803 $ $ 636,846 $ $ 716,275 $ $ 104,759 $ 3,494,462 $ $ $ 1,632,988 $ 236,389 $ $ $ 156,000 $ $ 724,675 $ $ $ $ 1,154,007 $ $ $ $ $ $ 10,850,204 Volume 1 - xxxvii === page 40 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Weapons Procurement, Navy includes $11,768,111 thousand of discretionary and $10,850,204 thousand of mandatory for a total of $22,619,315 thousand. The mandatory funds support: PAC-3 MSE: The Navy’s FY 2027 budget request includes $1,633 million mandatory request for the procurement of 382 PAC-3 MSE missiles. Tomahawk: The Navy’s FY 2027 budget request includes $3,872 million mandatory request for the procurement of 727 new Block V VLS Tomahawks, with canisters and support costs, 142 recertified Block V, 100 recertified Block Va (MST), 35 recertified Block Vb (JMEWS), 277 NAV/COMM kits, 100 MST kits, 223 M-code kits, 35 JMEWS upgrade kits, with support costs, and funding to support facilitization of capacity increases for Government Furnished Equipment vendors support the the Tomahawk program. Long Range Anti-Ship Missile (LRASM): The Navy’s FY 2027 budget request includes $236 million mandatory request for the procurement of 48 C-3 missiles and supporting radios. Multi-mission Affordable Capacity Effector (MACE): The Navy’s FY 2027 budget request includes $156 million mandatory request for the procurement of 353 lot 1 MACE AURs and associated production engineering, logistics, and program management support. Advanced Medium Range Air-to-Air Missile (AMRAAM): The Navy’s FY 2027 budget request includes $637 million mandatory request for the procurement of 388 AMRAAM missiles. Joint Advance Tactical Missile (JATM): The Navy’s FY 2027 budget request includes $716 million mandatory request with details held at a higher classification. Standard Missile: The Navy’s FY 2027 budget request includes $3,599 million mandatory request for the procurement of 133 SM-6 IAs, 301 SM-6 IAUs, and canisters. The FY 2026 spend plan for Weapons Procurement, Navy includes $6,086,954 thousand of discretionary and $4,063,652 thousand of mandatory for a total of $10,150,606 thousand. Volume 1 - xxxviii === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 1: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Program Elements for Code B Items: N/A Other Related Program Elements: 0605518N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 - - - 12 - 12 11 10 9 17 - 59 0.000 0.000 0.000 750.387 708.521 668.301 623.786 1,202.642 - 3,953.637 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 750.387 750.387 750.387 0.000 - - 0.000 750.387 - - 0.000 750.387 708.521 708.521 668.301 668.301 To FY 2031 Complete FY 2030 623.786 623.786 1,202.642 1,202.642 Total - 3,953.637 - 3,953.637 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Flyaway Unit Cost ($ in Thousands) - - - 62,532.250 - - 62,532.250 - 64,411.000 - 66,830.100 - 69,309.556 - 70,743.647 - - 67,010.797 - Gross/Weapon System Unit Cost ($ in Thousands) - - - 62,532.250 - 62,532.250 64,411.000 66,830.100 69,309.556 70,743.647 - 67,010.797 Description: This is a FY 2027 new start. Conventional Prompt Strike (CPS) warfighting capability will enable precise and timely strike in contested environments across multiple platforms. In coordination with the Army, the Navy CPS Program is designing a common All Up Round (AUR) comprised of a Common Hypersonic Glide Body (C-HGB), a Missile Body (MB) that consists of a 34.5" two-stage booster, and a Thermal Protection System (TPS). The Navy is responsible for the design of the C-HGB and assumed responsibility for C-HGB production from the Army in FY 2026. The Navy will design, develop, and produce the missile booster, as well as integrate the missile booster with the C-HGB. Each service will use the common hypersonic missile while developing individual weapon control systems and launchers tailored for launch from sea or land. Procurement efforts will provide a weapon system capability that: (1) is non-ballistic over the majority of the flight path; (2) controls stage drop; (3) provides positive control and precision accuracy from launch to impact; (4) provides adequate cross-range/maneuverability to avoid over-flight issues; (5) provides prompt lethal effects on targets; and (6) is man-safe and deployable for surface and submerged platforms. The CPS program's procurement profile will support missile fielding on ZUMWALT Class DDGs and VIRGINIA Class SSNs. In order to meet current Top Level Requirements (TLR) and future warfighter needs, the program has developed a Technology Insertion (TI) strategy. The TI process enables the program to continue accelerated and iterative improvements to system capability, manufacturability, and affordability and provide for obsolescence management. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 1 of 8 P-1 Line #1 Volume 1 - 1 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 1: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Program Elements for Code B Items: N/A Other Related Program Elements: 0605518N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Conventional Prompt Strike P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / 0.000 12 / 750.387 - / 0.000 12 / 750.387 - / 0.000 - / 0.000 - / 0.000 12 / 750.387 - / 0.000 12 / 750.387 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Procurement lead time for AUR+Cs is approximately 32 months from contract award. FY 2027 is the first year procuring deployable rounds with WPN funds. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 2 of 8 P-1 Line #1 Volume 1 - 2 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Conventional Prompt Strike MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 OOC 12 FY 2027 Total - 750.387 12 0.000 - 750.387 - 750.387 - 0.000 - 750.387 - 750.387 - 0.000 750.387 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - 62,532.250 - - 62,532.250 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway - Missile Cost Cost Recurring Cost (†) (1) 1.1.1) AUR+C - - - - - - - - - 1.1.2) System Engineering and Program Management - - - - - - - - - - - - - - - - - (SEPM) 51,674.000 12 620.088 - - - - - 55.629 - - - - - - 74.670 - - 51,674.000 12 620.088 - - 55.629 - - - 74.670 (2) 1.1.3) Weapon System Integration Assembly Test and Checkout (3) Subtotal: Recurring Cost - - - - - - - - - - - 750.387 - - - - - 750.387 Subtotal: Flyaway - Missile Cost Cost - - - - - - - - - - - 750.387 - - - - - 750.387 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 12 750.387 - - 0.000 12 750.387 (†) 62,532.250 62,532.250 indicates the presence of a P-5a Footnotes: (1) (2) Profile captures costs for common All Up Round (AUR) plus canister (C) units. An AUR is comprised of a Missile Body, a C-HGB, and a TPS. Systems Engineering and Program Management (SEPM) strategizes, plans, and provides oversight for the design, verification, and validation of AUR+C system-level architecture and performance. A significant portion of SEPM costs are fixed and not variable based on procurement quantity. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 3 of 8 P-1 Line #1 Volume 1 - 3 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Conventional Prompt Strike MDAP/MAIS Code: (3) The Weapon System Integration Assembly Test and Checkout element is the effort required for assembly and integration of the major missile components (e.g. solid rocket motors, inter stage, payload adapter, C-HGB, TPS) into the AUR configuration, the loading of the Canister for the final AUR+C delivery configuration, and the affiliated in-process and acceptance testing prior to delivery of each AUR+C. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 4 of 8 P-1 Line #1 Volume 1 - 4 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 Cost Elements 1.1.1) AUR+C (†) (†) O O C FY 2027 P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Contractor and Location Lockheed Martin (4) / Denver, CO Method/Type or Funding Vehicle Various Item Number / Title [DODIC]: 1 / Conventional Prompt Strike Location of PCO Award Date Date of First Delivery various Oct 2026 Jun 2029 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 12 51,674.000 RFP Issue Date Y indicates the presence of a P-21 Footnotes: (4) MSR based on joint Army and Navy procurement schedule. Annual Production Rates reflect ability of Lockheed Martin to meet both Army and Navy AUR+C procurement profiles. Procurements take 32 months between being placed on contract to initial delivery. P-5a unit cost does not include SEPM or integration costs per round. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 5 of 8 P-1 Line #1 Volume 1 - 5 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY 1.1.1) AUR+C 1 2027 SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Conventional Prompt Strike Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T Calendar Year 2027 0 A - N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) NAVY 12 12 O C T LI 1160 - Conventional Prompt Strike Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - 12 S E P Volume 1 - 6 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY 1.1.1) AUR+C 1 2027 SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Conventional Prompt Strike Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) NAVY 12 0 12 O C T LI 1160 - Conventional Prompt Strike Navy N O V D E C J A N F E B M A R A P R M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 7 of 8 2 S E P 2 O C T 2 N O V 0 P-1 Line #1 Volume 1 - 7 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1160 / Conventional Prompt Strike Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 1 Item Number / Title [DODIC]: 1 / Conventional Prompt Strike Production Rates (Each / Year) Procurement Leadtime (Months) Initial MFR Ref # Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 12 16 24 1 Lockheed Martin (4) - Denver, CO ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 32 Total After Oct 1 ALT Prior to Oct 1 32 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 32 32 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (4) MSR based on joint Army and Navy procurement schedule. Annual Production Rates reflect ability of Lockheed Martin to meet both Army and Navy AUR+C procurement profiles. Procurements take 32 months between being placed on contract to initial delivery. P-5a unit cost does not include SEPM or integration costs per round. LI 1160 - Conventional Prompt Strike Navy UNCLASSIFIED Page 8 of 8 P-1 Line #1 Volume 1 - 8 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 15,458.318 15,458.318 15,458.318 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,793.867 1,793.867 1,793.867 2,541.712 2,541.712 2,541.712 3,912.267 - 0.000 3,912.267 - 3,912.267 - 0.000 3,912.267 - 3,912.267 0.000 3,912.267 4,728.112 4,728.112 4,728.112 5,371.076 5,371.076 5,371.076 6,309.768 6,309.768 6,309.768 To FY 2031 Complete 6,849.011 6,849.011 6,849.011 Total 4,352.768 51,316.899 4,352.768 51,316.899 4,352.768 51,316.899 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: To maintain a strong strategic deterrent, the US Navy modernized the TRIDENT II (D5) missiles to the D5LE version, enhancing submarine survivability with increased range, minimizing costs by maximizing payload, and adding hard target kill capability for deployment on OHIO and COLUMBIA -class submarines. However, with D5LE electronics nearing obsolescence by FY 2039, the TRIDENT II D5 Life Extension 2 (D5LE2) program will utilize a Strategic Systems Programs Alteration (SPALT) approach to modernize the existing D5LE weapon system, specifically refreshing the electronics and addressing component obsolescence and inventory shortages to ensure the continued effectiveness of the US sea-based nuclear deterrent. The TRIDENT II Mods Budget Line Item 1250 budget is broken into three P-5 exhibits: (1) The D5 Life Extension (D5LE) program funds re-entry body Joint Fuze Sustainment, the guidance system SPALT kits program, procures missile electronics packages (Flight Control Electronic Assembly, Missile Inverter, Command Sequencer, and Interlocks) and production support. (2) The Operating and Support Costs program funds efforts associated with the sustainment of TRIDENT II D5LE missiles to include Warhead Components, Mk4B Shape Stable Nose Tip (SSNT), refreshes and replacement of D5 legacy tooling and test support equipment, system integration and planning efforts, Supportability Modifications/Strategic Programs Alteration (SPALT) Insertion, replacement of aging rocket motors, replacement of aging electronic components, guidance system parts, O/S Production Support, DOW/DON initiative of Industrial Base Sub-Tier Recapitalization - Strategic Solid Rocket Motors (SSRM), PBCS modernization, production re-starts of safety and reliability commodities and capital maintenance efforts at Missile Industrial Facilities. FY 2027 represents a focused effort to mitigate the risk of aging hardware and ensure the ability to maintain the demonstrated safety and reliability of the missile. Efforts include increasing hardware that supports sustainment and restarting the production of safety and reliability-critical commodities. (3) The D5 Life Extension II (D5LE2) subprogram, supporting the COLUMBIA-class Submarine, will continue WPN activities on the detailed design and non-recurring engineering efforts critical for the Strategic Weapons Systems (SWS) subsystems (Missile, Guidance, Fire Control, Launcher, Navigation, etc.) to incorporate design impacts driven by system level requirement refinement that have been occurring in the Research, Development Test & Evaluation, Navy Line Item 0101221N, Project 2228. FY 2026 is the last year of D5LE2 RDT&E,N funding. D5LE2 transitions from RDT&E,N system level requirements setting and trade study activities to WPN subsystem level evaluations and redesign activities, and production/vendor engagement and startup/restart. These activities leverage the Missile and Guidance Technology RDT&E,N efforts to inform subsystem level design concepts. The refinement of design concepts and the evaluation of subsystem level requirements are critical activities following the SRR in FY 2025 and subsequent subsystem System Requirement Reviews (SRR) through FY 2027. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 1 of 42 P-1 Line #2 Volume 1 - 9 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A FY 2027 efforts are critical to ensure manufacturing technologies are mature to support initial long lead procurement in FY 2030, large facility proofing and ground-based demonstration and experimental validation flights (X-Flights) starting in FY 2033, LRIP in FY 2034, and submarine launches in FY 2036 - 2038 - all prior to an FY 2039 Initial Fleet Introduction (IFI). The D5LE2 acquisition and funding strategy is directly modeled after the successful strategy utilized for the life extension of the D5 SWS (D5LE). Like D5LE, D5LE2 will be accomplished using the Strategic Systems Programs Alteration (SPALT) approach which incorporates updated and modernized designs into the existing D5 weapon system to address obsolescence issues and inventory shortages. Those items that can no longer be produced in the same fashion or that have older technologies that do not exist today are being redesigned to address obsolescence, subsequently removing constraints which deter the ability to access existing system margin or cause lengthy technology insertion timelines. D5LE2 WPN non-recurring efforts are for engineering activities or related manufacturing efforts applied to the TRIDENT II missile system to extend its useful military life while maintaining the current performance envelope in the face of a dynamic threat environment. Constraining the major design elements of the SWS, coupled with the decision to confirm the TRIDENT II missile (D5LE and D5LE2) as the weapon of choice for the COLUMBIA platform at its Milestone A and Milestone B decisions, bounds the external interfaces and silhouette of the SWS therefore making modernization of the D5LE SWS as the most effective acquisition approach. The FY 2026 funding includes $2,541,712 thousand discretionary and $610,000 thousand of mandatory (reconciliation) for a total of $3,151,712 thousand. Further information for this reconciliation request is provided in Section 20008 (Nuclear) of the Reconciliation Exhibit. Mandatory funding provides $62,000 thousand in FY 2026 for capacity expansion of the sea-leg of the nuclear triad. This effort maximizes missile inventory to support continuous production and availability of missiles to meet strategic needs. Of critical importance is the continuous production of limited life large energetics such as the Post Boost Control System (PBCS) and Solid Rocket Motors (SRMs). To achieve these objectives, strategic investments are made to 1) PBCS modernization efforts to improve the sub-tier supply chain by upgrading tooling and processes with modern techniques and materials and by adding an alternative insulation supplier and 2) additional railcars to support the expansion of missile processing capacity at the Strategic Weapon Facilities in Kings Bay, GA (SWFLANT) and Bangor, WA (SWFPAC). In order to optimize SRM inventory between SWFPAC and SWFLANT, additional rail cars are required to transport SRMs, which are large energetics, between the production facility in Utah, SWFPAC, and SWFLANT. Mandatory funding provides $148,000 thousand in FY 2026 for expanding D5 missile motor production which enables process improvements to enhance efficiency, reliability, and throughput, and to mitigate the impacts of age deterioration. Mandatory funding provides $400,000 thousand in FY 2026 to accelerate D5LE2 activities with a primary focus on advancing X-Flight testing, which will enable earlier learning and subsequent corrective actions. These funds will also support enhancements to the Fire Control system to accommodate mixed missile loadouts and adapt to changes in at-sea testing. FY 2027 D5 Life Extension Costs Include: 2.1.1 Production Support: Funding supports the (D5LE) production system integration efforts used for the processing of weapons systems, restart efforts at Courtland, AL and re-entry production/test requalification costs & restart efforts at Valley Forge, PA. This category funds the Free On Board (FOB) Destination Transportation charges for shipping hardware to government or prime contractor facilities. 4.1.1-4.1.5 Fleet Return Missile Electronic Strategic Systems Programs Alterations (SPALT) Kits: Funding provides for the procurement of Missile Electronics Packages and associated production support in order to extend the life of the D5 Missile to align with the OHIO-class life. FY 2027 Operating and Support Costs Include: 1.1 Warhead Components: Funding supports the production of the W76-1/Mk4A Reentry Body (RB) assembly and associated support equipment including RB cabling and RB Shells. Efforts also include Joint Test Assembly (JTA), Alternate Release Assembly (ARA) hardware, and Extended Navy Test Bed (ENTB) production. Lastly, funding supports the Unique Identifier (UID) efforts that allow the Fire Control System to electrically distinguish between W76-1 and W76-2 warheads. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 2 of 42 P-1 Line #2 Volume 1 - 10 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A 1.2 Mk4B Shape Stable Nose Tip (SSNT): The Mk4B SSNT program is converting RB forward shell assemblies (FSA) from legacy carbon composite nose tips to SSNT in order to provide more consistent and predictable flight performance characteristics of the weapon system. 1.3 Tooling, Test/Support Equipment: Funding provides for the refresh and/or replacement of aging test/evaluation and support equipment experiencing obsolescence that is required for testing of the TRIDENT II D5LE missile and its components. FY 2027 funds two critical refreshes for aging test consoles including a Teradyne testers refresh used for testing critical electronic components and systems and a refresh of the High Energy Computed Tomography (HECT) work center at Strategic Weapons Facility Atlantic (SWFLANT). Major test support equipment procurements in FY 2027 include Destruct Test Set, System Instrumentation Test Unit, Destruct Initiation Unit test console, Mk5 Test Console, Interconnect Test System, and Hosted Virtual Desktop Simulator test console, all of which are used to validate production hardware. Non test support equipment being procured in FY 2027 includes Guidance Installation Carriage, D5 Aerospike Protective Cap, Nose Fairing Dolly, and Access Seal Cover. 1.4 Systems Integration/Planning: Funding provides for system component management and integration as well as master schedule oversight and planning, age assessment of components, and Cybersecurity efforts. All lifecycle support efforts for test measurement diagnostic equipment (TMDE) are also funded in this category. 1.5 Supportability Modifications/SPALT Insertion: Funding provides for costs for SPALTs which convert D5 missiles to D5LE missiles for ashore inventory kits. This category also funds missile processing efforts that include the hands-on and hands-off support needed to deliver missiles. Support includes radiographic inspection, non-missile production related tasks for mechanics, technicians, production planners and controllers, along with missile system engineers. 2.1 & 2.2 Solid Rocket Motors (SRMs) and Post Boost Control Systems (PBCSs): Funding provides for the procurement of SRMs and PBCSs. SRMs required in FY 2027 to support joint OHIO and COLUMBIA patrols beginning in 2031. The lead time of these components necessitates procuring in FY 2027 for delivery in time to meet these strategic requirements. SRM procurement quantities decrease as a result of the production capacity strain due to D5LE2 boost rocket motor special test unit procurements occur in this year and efforts to increase production capacity at the contractor are in progress and expected to be concluded by FY 2029. PBCS procurements increase to support the expanded sea leg capacity. 2.3 Funds HMX procurement for the SRMs and PBCSs. 2.4 Ordnance funding supports requalifying, reproducing, and procuring missile hardware energetic components such as the High Voltage Detonator (HVD), Thru Bulkhead Initiators (TBI), Linear Ordnance System (LOS), Post Boost Control System (PBCS) Destruct, Flexible Linear Shape Charge (FLSC), Separation Linear Shape Charge (SLSC), and Third Stage Separation Charge Assembly (TSSCA). These efforts include Lot Acceptance Tests (LAT) conducted by NSWC Crane and production restart as part of the Courtland transition in support of ordnance production. Ordnance is required for missile production for in flight missile initiation and stage separations and DASO and CET destruct system to provide margin of safety in the event of missile system failure. 2.5 Controls provides for the production of the First Stage Thrust Vector Control (TVC) System Gas Generator and Servoactuator Assembly (SAA) as well as Post Boost Control System (PBCS) Gas Generators. 2.6 "Other" category cost element funds Propulsion Viability efforts that ensure the future viability of propulsion component production. FY 2027 funds Structures (Equipment Section, Interstages, Nose Fairing, Nose Cap, and Conduit Covers) assembly, disassembly, evaluation, certification efforts, and Thermal Impact Protection System (TIPS) Cable Builds and missile installation to ensure sufficient capability to support flight test program. Beginning in FY 2027 is the rayon replacement evaluation, as the existing rayon supply is projected to be exhausted by the early FY 2030s. Material evaluations are required in FY 2027 in order to support full scale requalification efforts for the new material by FY 2029. 2.7 Post Boost Control System (PBCS) Requalification: The PBCS Gas Generator (GG) system, designed in the 1980s, requires requalification due to several factors: the outdated design and reliance on aging production equipment create single points of failure, material obsolescence forces the use of new materials and suppliers, and critical energetic components have exceeded their 25-year service life. These issues, coupled with safety concerns associated with deployment on manned platforms, necessitate the requalification, reproduction, and deployment of these components to ensure continued operational safety and reliability. 2.8 Obsolescence Management - Post Boost Control System (PBCS): Funding is used to identify and mitigate risks associated with parts and materials related to PBCS becoming unavailable from their original manufacturer. This process is essential for ensuring the long-term supportability and operational readiness of systems. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 3 of 42 P-1 Line #2 Volume 1 - 11 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A 3.1 Electronics: Funding supports missile electronic components, specifically primary batteries. Primary batteries are continuing to be produced to address aging concerns as they will need to be available until 2049. 5.1 Production Support: This is separate and distinct from the Production Support cost element in the D5LE P5. This cost element supports efforts associated with the missile after it has been delivered to the government along with efforts to support the management of the Production and Deployed Systems Support contract. Funds the production of the Test Missile Kits and the Guidance Handling Cart. It also funds the production support overhead business operations costs of product quality assurance of delivered hardware, subcontracts management, program plans & requirements functions, and the finance & business operations of contract compliance and performance reports, Earned Value Management. 6.1 Guidance Repair Parts: Funding provides for the requalification process and the production of guidance system hardware piece parts that go into the Inertial Measurement Unit (IMU) and an Electronics Assembly (EA). These items are required to sustain the sub-components necessary to support the MOD 1 Guidance Systems. 7.1-7.5 Industrial Base Sub-Tier Recapitalization: To address a surge in demand that is straining the production capacity and quality of Solid Rocket Motor (SRM) suppliers, the Industrial Base Sub-Tier Recapitalization (SSRM) initiative utilizes a phased investment plan from FY 2024-2028 to modernize the SRM industrial base. This recapitalization focuses on improving process technology, techniques, and tooling to current industry standards, aiming to enhance predictability, quality, throughput, and cost-effectiveness while minimizing disruption to ongoing production. By strategically addressing critical constraints and rate efficiency opportunities across five cost elements, this initiative seeks to establish a credible and affordable SRM production capability to support DoW programs for the next 20+ years. 7.6 PBCS modernization addresses critical capacity and obsolescence challenges. Aging equipment and obsolete materials are creating capacity limitations that directly constrain operational readiness and mission effectiveness. The modernization initiative will address both quantitative production capacity improvements, including enhanced manufacturing throughput, and qualitative upgrades necessary to integrate contemporary technologies and materials into current systems. 7.7 Production restarts and associated planning of safety critical commodities where there are concerns about age related degradation of commodities. Mitigation of safety concerns will reduce the probability of unplanned early D5LE end-of-life. In addition, there are production restarts for commodities where we have age related degradation concerns related to reliability of the missile. Decreased reliability will require increased surveillance / flight testing to meet STRATCOM requirements. Mitigation of reliability concerns supports maintaining sufficient inventory through the D5LE2 replacement timeline. Production restarts are required due to commodity failures that if not addressed with result in a system level impact. 8.1 Missile Industrial Facilities funding provides for capital maintenance projects at Navy-owned Naval Industrial Reserve Ordnance Plants (NIROPs) at Sunnyvale, California, Santa Cruz, California, and Bacchus, Utah in support of the Fleet Ballistic Missile program. The Sunnyvale facility consists of 49 acres of land and 10 buildings. The Santa Cruz facility consists of 271 acres of land and 29 buildings. The Bacchus facility consists of 583 acres and more than 130 buildings and more than 13 miles of roads. FY 2027 D5 Life Extension 2 (D5LE2) Costs Include: Preliminary design efforts began in FY 2023 and continue through the final subsystem preliminary design review (PDR) in FY 2028. FY 2027 includes a ramp up to the program to bolster the specialized workforce and industrial base for modernization and production restart/startup and conduct subsystem level evaluations and redesign activities. Major milestone activities occurring in FY 2027 are described below by subsystem. 1.1-1.11 D5LE2 Missile Redesign: Missile Alteration (SPALT) Redesign: FY 2027 D5LE2 Missile subsystem efforts include: Airframe redesign, production requalification, and support of the Missile Airframe inclusive of the Equipment Section, Nose Fairing, Motor Equipment Module, Interstage, and associated parts. Propulsion engineering support to complete the Missile level planning, data products closeout of the Flight subsystem SDR, preparations and completion of Flight Subsystem PDR. Electronics and Avionics engineering effort required to mature the D5LE2 Missile Avionics packages/products for completion of Flight Subsystem PDR. Controls design efforts, integration, and implementation of a new alternate design of the Post Boost Controls System (PBCS). Ordnance Flight Subsystem PDR activities to design, develop and test an initiation subsystem, which includes the redesign, production requalifications and support for Missile initiation ordnance items and control subsystems inclusive of detonators, initiators, linear shape charges, separation charges, and other associated components. Test Missile Kit 2 (TMK2) efforts to define physical and interface details and modeling physical performance of concepts and technologies LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 4 of 42 P-1 Line #2 Volume 1 - 12 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A in preparation for Flight Subsystem PDR. Systems Engineering support of requirements updates and development of component level and below, further interface definition, Configuration & Data Management, Missile System Integration, Flight Sciences analysis, Specialty Engineering and Verification assessments in support of Flight Systems PDR, subsystem PDRs, and walk-up to Subsystem Redesign Sufficiency Assessment 2 (SRSA-2). Test and Evaluation focused on manning and development of software simulations and emulations as well as x-flight unique support equipment requirements. System Assembly required Facility Activation Plan (FAP) development, Facility Equipment requirement (PERL, FMEL) development, Facility Design Criteria (FDC) development, and a comprehensive Activation Integrated Schedule for the Eastern Range, Strategic Weapons Facility Atlantic (SWFLANT), and Strategic Weapons Facility Pacific (SWFPAC). Support Equipment procurement of both electrical and ground test support equipment selected for redesign in support of D5LE2. Reentry Body integration and interface pre-test modeling and simulations. 2.1-2.8 D5LE2 Guidance Redesign: In FY 2027, the program preliminary design efforts including navigation algorithms and software, and system hardware. Continue Radiation Hardened (RH) parts design activities as key technologies achieve suitable technology readiness levels to support detailed design. Continue sensors prototype development and testing of sensors and sensor subsystem electronics and preliminary design. Development of Guidance Subsystem Information Systems (IS) and Data Management (DM) infrastructure and systems. Continue development of test equipment to support prototype testing, includes Guidance Subsystem test equipment planning, architecture, design, and development and preliminary design of system test equipment to support guidance system evaluation. Continued support of Integrated Test program planning, continue requirements verification planning, and test facilities development, includes Guidance System integration, test, and evaluation. 3.1-3.3 D5LE2 Ship Interface: - Fire Control FY 2027 efforts include the completion of the Fire Control System (FCS) Preliminary Design Review (PDR). Production and installation activities for the Engineering Test Station lab scheduled to begin in FY 2027. MT9 system design and development efforts, along with production and installation of the MK99 FCS, are to begin in FY 2027. FY 2027 also initiates the development of the Fire Control Emulator and FC Integrated Test Support Suite (FITSS) development. - Launcher: FY 2027 continues production of a launch tube for Engineering Test Facility (ETF). Completion of Knowledge Point 2 (KP2) and preparation for SRSA-2 including Descriptive System Modeling in support of these milestones. Conversion of legacy launcher Technical Data Package to computer aided design (CAD) models as record of authority. - Navigation: FY 2027 continues to support SWS level reviews and to support efforts towards Navigation PDR. Continued support for development of Model Based System Engineering (MBSE) functional model development and integration, requirements refinement and initial development for Navigation emulator, and planning efforts to deliver Navigation Tactical INC 8 INS to the Guidance Test Bed (GTB). Define plan to incorporate Modeling and Simulation (M&S) Capabilities into D5LE2 SWS Level M&S Systems. 4.1 System Evaluation: FY 2027 continues SWS-wide systems engineering management across all subsystems, with the primary focus on SRSA-2 activities. These activities include system integration, emphasizing subsystem interface maturity to assess each subsystem's Interface Readiness Level. Also focusing on system verification and validation, emphasizing analysis methodologies, event planning, and procedure development. System interface development with emphasis on the SWS physical architecture model. Preliminary evaluations of system and subsystem performance towards SRSA-2 and accuracy model coordination with subsystems will also be conducted. Finally, an SRSA-2 progress assessment will be performed at KP-2 to verify the SWS preliminary design will be satisfactorily completed and validated through model-based environments. This assessment will also include action item closure/close out of KP-2 as applicable. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 5 of 42 P-1 Line #2 Volume 1 - 13 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 1 / TRIDENT II Mods - D5 Life Extension P-5a, P-21 P-5 2 / TRIDENT II Mods -Operating and Support Costs P-5a, P-21 P-5 3 / D5LE2 [D5LE2] P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code 178 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 6,887.533 - / 209.997 - / 94.372 / 73.712 - / 0.000 - / 8,241.059 - / 777.853 - / 873.363 - / 1,176.456 - / 0.000 - / 1,176.456 - / 329.726 / 15,458.318 - - - / 73.712 / 806.017 - / 1,573.977 - / 2,662.099 - / 0.000 - / 2,662.099 / 1,793.867 - / 2,541.712 - / 3,912.267 - / 0.000 - / 3,912.267 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding in the TRIDENT II Mods line is required to continue the procurement of TRIDENT II missiles and currently supports the life-extension of the D5 missile. 1/ TRIDENT II Mods - D5 Life Extension Program P-5 Detail: The FY 2027 request of $73.712M for the D5 Life Extension (D5LE) Program funds missile electronics packages (Missile Inverter) and associated production support. These efforts are required to support the extended SSBN hull life for a 14 OHIO-class SSBN TRIDENT II program. (Cost Element 1.1.1) Joint Fuze Sustainment costs decrease (-$6.354M) from FY 2026 to FY 2027 due to completed production and assembly of Arming, Fuzing and Firing (AF&F) systems and associated components in FY 2026. (Cost element 2.1.1) Production Support Costs decrease (-$.596M) from FY 2026 to FY 2027 as quantity of D5 Life extension procurement hardware decreases, decreasing the D5LE share of the support costs. As the D5LE hardware production efforts conclude, the recurring hardware production support costs, previously cost shared with D5LE then shift to reflect solely supporting Operations and Sustainment hardware production efforts. (Cost Element 4.1.2) Missile Inverter costs increase ($10.627M) from FY 2026 to FY 2027 due to quantity increase from 20 to 30. While the final testing capability is relocating in 2026, production was temporarily reduced to a quantity of 20. However, in FY 2027 relocation is complete and production ramps to the required rate of 30 to meet strategic outload requirements. (Cost Element 4.1.3) Command Sequencer costs decrease (-$24.578M) as procurement of the final units completed in FY 2026. 2/ TRIDENT II Mods - Operating and Support Costs P-5: The FY 2027 request of $1,176.456 million for Operating and Support Costs funds efforts associated with the sustainment of TRIDENT II (D5) missiles to include Warhead Components, MK4B Shape Stable Nose Tip (SSNT), refreshes and replacement of D5 legacy tooling and test support equipment, Supportability Modifications/Strategic Programs Alteration (SPALT) Insertion, system integration efforts, replacement of aging rocket motors and Post Boost Control Systems, Missile electronic and ordnance event initiation components, production support, Guidance repair parts, Industrial Base Sub-Tier Recapitalization (SSRM), strategic requirements and capital maintenance projects at Navy-owned Naval Industrial Reserve Ordnance Plants (NIROPs). LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 6 of 42 P-1 Line #2 Volume 1 - 14 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A (Cost element 1.1) Warhead Components increase ($25.195M) from FY 2026 to FY 2027 due to increase production of radio frequency components and requalification efforts for the Mk4 Thruster Pad and the Bolt Catcher Assembly. FY 2027 also commences the Mk5 JTA Transmission Line production, and adds production efforts for simplified release assembly conversions, release assembly disassembly, and Mk5 Alt 370 reentry body assembly simulator SPALT Conversions. (Cost element 1.2) Mk4B Shape Stable Nose Tip (SSNT) increase ($7.461M) supports increased production of tactical MK4B nose plug billets and reentry body cable assemblies to include Mk4A inert heads (IH) and internal fault detector connector. FY 2026 to FY 2027 costs increase to meet fleet strategic requirements. In addition, is the production of the Navy Experimental Surveillance Test (NEST) which supports flight tests by gathering performance data to inform aerodynamic modeling. (Cost element 1.3) Tooling, Test/Support Equipment cost increases ($24.218M) to fund two critical refreshes for aging test consoles including a Teradyne testers refresh used for testing critical electronic components and systems and a refresh of the High Energy Computed Tomography (HECT) work center at SWFLANT, which is used for testing solid rocket motors. Additional major test support equipment procurements in FY 2027 include Destruct Test Set, System Instrumentation Test Unit, Destruct Initiation Unit test console, Mk5 Test Console, Interconnect Test System, and Hosted Virtual Desktop Simulator test console, all of which are used to validate production hardware. Non test support equipment being procured in 2027 includes Guidance Installation Carriage, D5 Aerospike Protective Cap, Nose Fairing Dolly, and Access Seal Cover. The specific scope of the Tooling, Test/Support Equipment cost element fluctuates annually based upon specific tooling and test support equipment refreshes and procurement needs. (Cost element 1.5) Supportability Mods/SPALT Insertion increases ($26.209M) from FY 2026 to FY 2027 to support additional missile processing activities at both Strategic Weapons Facility Atlantic (SWFLANT) and Strategic Weapons Facility Pacific (SWFPAC) to include increased assembly, disassembly, and testing for SPALT insertions in support of the expanded sea leg capacity, required in order to meet strategic objectives. (Cost element 2.1) Solid Rocket Motors (SRM) quantities decrease (-$12.741M) from 13 in FY 2026 to 12 in FY 2027 to support strategic requirements. Increase in unit cost is due to high escalation of material and production costs. This decrease in procurement quantity in FY 2027 is due to production capacity strain as D5LE2 boost rocket motor special test unit procurements occur in this year and efforts to increase production capacity at the contractor are in progress and expected to be concluded by FY 2029. (Cost element 2.2) Post Boost Control System (PBCS) quantities increase ($14.740M) from 12 in FY 2026 to 15 in FY 2027. Increase PBCS quantities required to support expanded sea leg capacity. (Cost element 2.3) HMX costs increase ($2.257M) due to additional procurements of Post Boost Control System Gas Generators. (Cost element 2.4) Ordnance costs increase ($12.170M) due to Separation Linear Shape Charge (SLSC) requalification efforts to replace the obsolete polyurethane foam material. SLSC is critical as it enables reliable and precise motor separation during flight. Beginning in FY 2027 two Velocity of Detonation (VOD) test consoles are being built in support of Flexible Linear Shape Charge (FLSC) and SLSC. Additionally, in FY 2027 is the ongoing requalification efforts of the Test Line and Linear Ordnance System (LOS) and Through Bulkhead Initiator (TBI). (Cost element 2.5) Controls cost increases ($14.504M) in FY 2027 due to the requalification of the First Stage (FS) Servo Actuator Assembly (SAA) production line, as a result of the production facility relocation. In addition, in FY 2027 is the design and implementation of an on-demand testing for the SAA and Gas Hydraulic Assembly (GHA). (Cost element 2.6) Other costs increase ($9.377M) in FY 2027 to fund the rayon replacement evaluation, as existing procurements are projected to be exhausted by the early FY 2030s. Material evaluations are required in FY 2027 in order to support full scale requalification efforts for the new material by FY 2029. The type of rayon for these efforts is a highly specialized material critical for protecting rocket motor components from the extreme heat and erosive forces of propellant exhaust. (Cost element 2.7) Post Boost Control System (PBCS) Requalification costs increase ($7.314M) in FY 2027 in order to modify space-rated hardware, specifically the Intravehicular Activity (IVA) suits and manifolds, for ground use. The Inert Component Ground Conversion Qualification is a required step to perform the full system requalification test for the new PBCS cases. (Cost element 2.8) Obsolescence Management for Post Boost Control System efforts ($7.621M) begin in FY 2027 to include management of current known obsolescence issues such as o-rings, curing agents, antioxidants, and resin binders and the identification of possible obsolescence issues in future years. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 7 of 42 P-1 Line #2 Volume 1 - 15 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A (Cost element 3.1) Electronics cost increase ($2.073M) in FY 2027 due to material cost increases for primary batteries. (Cost element 5.1) Production Support increases ($115.773M) from FY 2026 to FY 2027 as the Trident program increases production of components to support expanded sea leg capacity, implements new tools including Classified Stockpile Management Software (SMS) implementation of a digital tool for re-entry body planning and inventory management needed to expedite SWF planning efforts, especially as it pertains to fleet schedule changes ($6.230M); expands efforts in the areas of component sustainment to ensure production continuity for the Trident program in the face of a limited industrial base as the program complexity increases with multiple large scale requalification and industrial base expansion ($9.713M) and enhancement efforts commence on top of program production efforts, program planning support is amplified in alignment with multiple large scale efforts ($56.013M). Additionally, costs increase for Test Missile Kit as the program commences the Test Missile Kit Alternate TMK Architecture (ATA) SPALT which is an architectural change to the TMK Flight Termination System (FTS) to enhance SSBN safety during a flight test event while balancing range and public safety ($43.817M). (Cost element 7.1) SRM Chamber/Case Modernization costs decrease (-$21.500M) due to the effort ending in FY 2026. (Cost element 7.2) SRM Igniter/Nozzle costs decrease (-$17.500M) due to the effort ending in FY 2026. (Cost element 7.3) SRM Propellant/Energetics Modernization costs decrease (-$25.206M) due to the effort ending in FY 2026. (Cost element 7.4) SRM Small Motor and Ordnance Modernization costs increase ($12.000M) in FY 2027 for Third Stage Eject Motor and Nose Fairing Jettison Motor efforts. This provides for sub-tier supplier tooling procurements and more efficient production processes to decrease single points of failure of the production line. (Cost element 7.6) Post Boost Control System (PBCS) modernization efforts ($45.000M) begin in FY 2027 to address aging equipment and obsolete materials that are creating capacity limitations, which directly constrain operational readiness and mission effectiveness. The modernization initiative will address both quantitative production capacity improvements, including enhanced manufacturing throughput, and qualitative upgrades necessary to integrate contemporary technologies and materials into current systems. FY 2027 funds sub-tier supplier improvements to include upgrading tooling and processes with updated technical methods and materials and adding an alternative insulation supplier to improve supply chain constraints with current supplier. Additionally, there will be process improvements, feasibility assessments and trade studies will occur to review the low-cost manifold (LCM), elbow and igniter case, digital X-ray conversion, grain face formers and compression molding. Efforts to update and digitize tool drawings will occur to convert all paper drawings to computer-aided design (CAD) models required for the procurement of new tooling. (Cost element 7.7) Production restarts efforts ($52.709M) begin in FY 2027 efforts include pre-restart producibility assurance and planning phase to include: vendor assessments, modernize production drawings and investigations to resolve any producibility challenges prior to initiating the requalification process. The production restart process will begin with the following safety-critical commodities: First Stage (FS) Firing Unit, Umbilical Distribution Unit, Power Distribution Unit and FS Thrust Vector Control (TVC) Gas Hydraulic Assembly (GHA); and the following commodities related to the reliability of the missile: Second Stage (SS) TVC GHA, SS Firing Unit and TS Firing Unit. (Cost element 8.1) Capital Maintenance increase ($1.174M) in FY 2027 for projects at the Bacchus NIROP facilities will replace building utility transformers and switchgear in buildings (46A & 59); perform catenary lightning protection system updates to buildings (37 & CD9A); building power/utility supply connections compliance to buildings (46A & 10A); replace HVAC/process chiller in building (47A); replace supervisory control and data acquisition (SCADA) HVAC controls in building (7A); perform hypalon roof membrane replacement on buildings (35 & 10A); repair walking and working surfaces for building (49A); SCADA updates to buildings (63 & 64); perform network communication replacement phase 8; perform building interior/exterior painting to building (18); as well as perform NIROP emergent capital maintenance and utility replacements. 3/ D5 Life Extension 2 (D5LE2) Program P-5: LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 8 of 42 P-1 Line #2 Volume 1 - 16 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A The FY 2027 request of $2,662.099 million for D5LE2 funds efforts focusing on the detailed design and non-recurring engineering required for Strategic Weapons Systems (SWS) subsystems (Missile, Guidance, Fire Control, Launcher, Navigation, etc.). These critical activities incorporate the impacts to design that are driven by System Level requirement refinement that have been occurring in the Research, Development Test & Evaluation, Navy Line Item 0101221N, Project 2228 through FY 2026. FY 2026 completes the D5LE2 transition of all RDT&E,N development activities and full transfer of the D5LE2 program to Weapons Procurement, Navy for the Engineering and Manufacturing Development phase. FY 2027 funds subsystem level evaluations and design activities, and production/vendor engagement and startup/restart. These activities leveraged the Missile and Guidance Technology RDT&E,N efforts to inform subsystem level design concepts. Design concepts and subsystem level requirements evaluations are critical to supporting Subsystem Redesign Sufficiency Assessment (SRSA-2) and PDRs to ensure proposed design concept meets established requirements. (Cost Element 1.1) Airframe increases ($68.667M) in FY 2027 support the completion of Missile Airframe/Structures Preliminary Design Review (PDR) in FY 2027. This hardware procurement is required to support the detailed buildup and delivery of Structures Engineering Development Units (EDUs) which will enable producibility assessments, subsystem model development, and system level integration testing. These system level integration tests will evaluate the response of the below Structures components to various environments that simulate dynamic flight environments. Hardware procurement to support testing includes 3 Equipment Sections, 3 Interstage Sections, 3 Third Stage Motor Skirts, and 3 Nose Fairing Sections, 2 First Stage Nozzle Shield Assembly and 2 Third Stage Nose Cap Snubber Assembly. FY 2027 testing will contain Structural Test Lab (STL) testing for the Equipment Section (ES), Motor Equipment Module (MEM), Nose Fairing (NF), & Interstage (IS) commodities. Tests will be used to validate the design and structural analysis for the critical load cases such as free hoist, closure impact, surface broach, max flight pressure buckling, etc. as well as converting small-scale prototype builds to EDUs for hardware testing. Additionally, the FY 2027 increase supports the continuation of Phase A requalification efforts for Airframe/Structures components that have been out of production for decades to include: Conduit Covers, Direct Ship Parts and the Nose Cap. (Cost Element 1.2) Propulsion decreases (-$11.008M) in FY 2027 due to (1) the completion of initial missile level planning, and (2) data products closeout and completion of the Flight subsystem SDR in FY 2026. FY 2027 supports the preparation for and completion of Flight Subsystem PDR, to include survivability evaluation and modeling of functional and physical interfaces. FY 2027 hardware procurements include inert special test vehicles: three (3) first stage inert Rocket Motors, three (3) second stage inert Rocket Motors, three (3) third stage inert Rocket motors and (3) first stage nozzle baffles that will be utilized in system testing. (Cost Element 1.3) Electronics and Avionics increases ($274.585M) in FY 2027 for the buildup of Engineering Development Units (EDUs) of critical components, producibility assessments, subsystem model development, system level integration testing, prototyping and procurement of long lead material, redesigning/restarting and requalifying heritage technologies, and a ramp up of design and industrial base personnel. Efforts continue for testing of prototypes and EDU level fidelity hardware of avionics' safety critical packages in order to mature the D5LE2 Missile Electronics and Avionics packages for completion of Flight Subsystem PDR. FY 2027 efforts are imperative to the buildup EDUs that will directly enable the experimental flight test program in the early 2030s which is critical to establishing confidence in the design and production required to meet Initial Fleet Introduction (IFI). Procurement in FY 2027 of 5 missile sets of Tactical Avionics EDUs and procurement of the lower-level electronic parts to continue maturation for strategic radiation hardened parts and to be used in Tactical Avionics AEDU builds. FY 2027 Critical Avionics Packages and Software procurements include: 5 Addressable Explosive Foil Initiator Firing Units, 5 Primary Electronics Battery, Cables and Connectors, Communication Network, Shipboard Missile Readiness and Test Software, Pressure Transducers, Missile Body Electronic Parts, Separation Sequencer Units, Initiation Assemblies, 5 Power Distribution and Transfer (PDT), 5 Safe Arming and Fuzing Electronics, 5 Removable Initiation Safety Electronics, 5 Initiation and Deploy Electronics, 5 Pre-Boost Electronics, and 10 Umbilical Distribution Units. Each of these safety critical Avionics Packages support the completion of Tactical Avionics PDR and Flight Subsystem PDR artifacts including: module-level schematics, critical circuit-level simulations, preliminary derating analysis for power and radiation effects, preliminary worst-case analyses, and preliminary package test plans. Definition of internal and external interfaces will be completed as well as hardware analyses and testing of the EDUs. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 9 of 42 P-1 Line #2 Volume 1 - 17 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A Additionally, the FY 2027 increase supports the beginning of Phase A requalification effort for Pressure Transducer components that have been out of production. (Cost Element 1.4) Controls increases ($174.660M) in FY 2027 due to the continuation of detailed design and technical maturation of the Post Boost Controls System (PBCS). This includes the procurement of controls components to support hardware designs for the buildup of EDUs, manufacturing and fabrication of Integrated Valve Assemblies (IVA) hardware, Isolation Valve Assembly and Sequence Valve Assembly EDU hardware and completion of component and subsystem testing of Hot-Fire and Hot-Gas EDUs in representative environments prior to system level testing. Procurement quantities include: (3) First Stage (FS) TVC Gas Generators (GG) - Inert, (1) FS TVC GG - Live, (6) FS Servo Actuator Assemblies (SAA) and (3) FS Gas Hydraulic Assemblies (GHA). For the second stage (SS), there are (4) SS TVC GGs - Inert, (1) SS TVC GG - Live, (8) SS SAA, and (4) SS GHA. For the third stage (TS), there are (4) TS TVC GG - Inert, (1) TS TVC GG - Live, (8) TS SAA, and (4) TS GHA. Finally, there are 8 PBCS GG - Inert. Additionally, the FY 2027 increase supports the continuation of requalification efforts for the Aerospike, SS TVC SAA, SS TVC GG, TS TVC GG, TS TVC SAA and TS TVC GHA. (Cost Element 1.5) Ordnance decreases (-$7.349M) in FY 2027 as efforts complete in developing the model-based prototype design of the High Voltage Detonator-Exploding Foil Initiation (HVD-EFI). FY 2027 also includes support Flight Subsystem PDR activities to design, develop and test an initiation subsystem, which includes the redesign, production requalifications and support for Missile initiation ordnance items and control subsystems inclusive of detonators, initiators, linear shape charges, separation charges, and other associated components. These efforts also flow into completion of the Ordnance subsystem PDR and conduct of Flight Subsystem PDR. Following the model-based prototype design, Hardware procurement of HVD EFIs begins with procurement of 185 inert HVD-EFIs, 200 live HVD-EFIs, and 25 TMK specific inert HVD-EFIs. (Cost Element 1.6) Test Missile Kit 2 (TMK2) increase ($38.705M) in FY 2027 is due to hardware development, testing, model validation, parts model coordination, and management of two battery vendors through Flight System PDR. TMK2 increases also include the procurement of antennas, MIL STD piece parts (e.g. switches, transducers), accelerometers, cables, connectors - all of which are required to begin the buildup of EDUs for subsystem and system level testing. The procurements in FY 2027 are: 6 units of Onboard Flight Test, Telemetry, Tracking, and Communications Equipment, 5 inert Test Missile Kits (TMK) and 10 Autonomous Flight Safety Systems (AFTU). Additionally, there are 50 Destruct Initiation Unit (DIU) Assemblies, 5 Destruct Interlocks (DI) Assemblies, 525 Telemetry Sensors, and 20 Transmitters. (Cost Element 1.7) Systems Engineering increases ($20.954M) in FY 2027 to support continuation of requirements updates and development of component level specifications and subordinate specifications, further interface definition, Configuration & Data Management, Missile System Integration, Flight Sciences analysis /Specialty Engineering (reliability, accuracy, EM effects, survivability, human factors, etc.) efforts, and Verification assessments in support of Flight Systems PDR, subsystem PDRs, and SRSA-2. (Cost Element 1.8) Test and Evaluation increases ($47.101M) in FY 2027 due to increased focus on manning and development of software simulations and emulations as well as X-flight unique support equipment requirements. The Access Stand is a long lead material procurement in FY 2027 and is required to enable experimental (X-Flight) readiness. FY 2027 focuses on LE2 flight performance characteristics and Missile dynamic model development which build on the software simulations and emulations. (Cost Element 1.9) System Assembly increases ($61.354M) in FY 2027 are for critical efforts needed at the facilities for D5LE2 execution including: Facility Activation Plan (FAP) development, Facility Equipment requirement development, Facility Design Criteria development, and a comprehensive Activation Integrated Schedule for the Eastern Range, Strategic Weapons Facility Atlantic (SWFLANT), and Strategic Weapons Facility Pacific (SWFPAC). Facility Engineering and Activation support include the critical planning, integration, proofing, and development efforts across the Strategic System Programs Facilities to activate mission essential facility capabilities needed to execute the D5LE2 program. In FY 2027 increases are due to support: 1) Commencing facility modifications Missile Assembly Building-1 at SWFPAC 2) Design efforts for Missile Inspection Building and Missile Processing Warehouse at SWFPAC 3) Proofing efforts ETF, design efforts for Cape Rail Head, Complex 46, and the MACA buildings at Eastern Range/Naval Ordnance Test Unit (NOTU) LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 10 of 42 P-1 Line #2 Volume 1 - 18 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A 4) Design efforts for Missile Integrated Support Facility and Missile Assembly Building-3 at SWFLANT (Cost Element 1.10) Training and Support Equipment increases ($106.027M) in FY 2027 due to the procurement of electrical and ground test support equipment selected for redesign in support of D5LE2. Support equipment increases in FY 2027 is to procure a common package tester to support Tactical Avionics testing TMK2 integration. Additionally, X-Flight unique support equipment begins refurbishment in FY 2027 to support pad launches in FY 2033. Training increases in FY 2027 includes additional training of personnel to support the concept reviews and requirement definition for the D5LE2 Trainer Program to include Missile subsystem, sub-subsystem and component level testers. (Cost Element 1.11) Reentry Body integration increases ($17.143M) in FY 2027 due to reentry hardware procurements for system level and subsystem testing on test vehicles in support of missile development efforts as well as a ramp up in support for pre-test modeling and simulation for system and subsystem level PDRs. Reentry procurements in FY 2027 include: 5 Alternate Release Assembly Structures, 5 Mk4A Separation Cable Assemblies, 8 Mk4B Inert Heads, and 5 Mk4A Alternate Release Assemblies. (Cost Element 2.1) Systems Engineering increases ($10.611M) in FY 2027 to support SWS level reviews and to continue the system concept development in support of KP-2 and begin Guidance Subsystem preliminary design efforts in support toward Guidance PDR. This includes Guidance System requirements development and management, architecture development and system trade studies, and maturation of program technical plans and processes, includes Systems Engineering efforts for the Guidance Subsystem including subsystem architecture, design, modeling, simulation & analysis, requirements development, and verification and validation. (Cost Element 2.2) Algorithms and Software increases ($4.762M) in FY 2027 to develop preliminary designs for software and navigation algorithms in support of Guidance PDR. Continued efforts include refinement of software environments, processes, and standards, implementing operating system, and processor support, evaluation of software and navigation algorithm prototyping, and simulation architecture, and continued Algorithms and Software development efforts for the Guidance Subsystem. (Cost Element 2.3) Guidance System Hardware increase ($5.722M) in FY 2027 to continue for preliminary design efforts in support of Guidance PDR, processor and memory design development, communications and timing hardware technical maturation, electromechanical and platform control prototype development and demonstrations, and electronics packaging development, includes Guidance System Hardware design, development, and test. (Cost Element 2.4) Radiation Hardened (RH) parts increase ($84.662M) in FY 2027 for acquisition of prototype hardware. RH parts continues support of part design activities as key technologies achieve suitable technology readiness level (TRL) to support detailed design. Efforts including parts requirements and parts model development, maintenance of the initial RH parts list, RH parts characterization of prototype parts such low voltage analog parts for test and evaluation. Efforts are critical to establish a viable parts catalog and vender base that supports RH Avionics package for preliminary design for both the Missile and Guidance Subsystems. Efforts in this area are tightly coupled with the design and productization of strategic-grade sensors for the Guidance Subsystem. (Cost Element 2.5) Sensors increase ($3.918M) in FY 2027 to continue the candidate sensor technology evaluation, support for Guidance System PDR (sensor requirements flowdown, and preliminary design development). Includes radiation hardened sensor development to include accelerometer, gyroscope, optical sensing, sensor evaluation, and timing reference. (Cost Element 2.6) Information Systems/ Data Management (IS/DM) increases ($7.784M) in FY 2027 supporting the development of IS/DM Program Plans and refinement of IS/DM requirements. Continue development and deployment of IS/DM infrastructure includes development of Guidance Subsystem Information Systems (IS) and Data Management (DM) systems to include Protocol Data Unit (PDU) Software in the Loop (SWIL) data, Hardware In the Loop (HWIL) data, test data and deployed systems data simulation. (Cost Element 2.7) Test Equipment increases ($6.335M) in FY 2027 to continue supporting developmental test equipment requirements and refinement of Test Equipment Management Plan (TEMP). Continue development of test equipment to support prototype testing, includes Guidance Subsystem test equipment planning, architecture, design, and development and preliminary design of system test equipment to support guidance system evaluation. (Cost Element 2.8) Integration and Test increases ($11.820M) in FY 2027 in support of integrated test and evaluation of prototype hardware in support of preliminary design. Continued support of Integrated Test program planning, continue requirements verification planning, and test facilities development, includes Guidance System integration, test, and evaluation. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 11 of 42 P-1 Line #2 Volume 1 - 19 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 2: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0101221N Line Item MDAP/MAIS Code: N/A (Cost Element 3.1) Fire Control increases ($78.837M) in FY 2027 to support several planned efforts critical to the D5LE2 program. Key activities include completion of the Fire Control System (FCS) PDR. Production and installation activities for the Engineering Test Station lab begin in FY 2027. Additionally beginning in FY 2027 are the MT9 system design and development efforts, along with production and assembly of the MK99 FCS. FY 2027 also initiates the development of the Fire Control Emulator which will serve as an auxiliary system replicating the D5LE2 FCS interface to the missile. FC Integrated Test Support Suite (FITSS) development will begin in FY 2027 to support a purpose-built Auxiliary system at the launch pad site to support X-flights. (Cost Element 3.2) Launcher increases ($13.502M) in FY 2027 to continue production of a launch tube for Engineering Test Facility (ETF). Completion of Knowledge Point 2 (KP2) and preparation for SRSA-2 including Descriptive System Modeling in support of these milestones. Conversion of legacy launcher Technical Data Package to CAD models as record of authority. (Cost Element 3.3) Navigation increases ($1.864M) in FY 2027 for the procurement and system engineering development of NAV Emulator (NEIS). Continued efforts to develop, integrate, and maintain models and simulations to support system and subsystem design and evaluation activities. (Cost Element 4.1) System Evaluation increases ($67.466M) in FY 2027 to support the Strategic Weapons System wide systems engineering management across all of the subsystems with a focus on SRSA-2 activities, including: system integration with emphasis on subsystem interface maturity to assess each subsystem Interface Readiness Level, system verification and validation with emphasis on analysis methodologies, event planning, and procedure development, system interface development with emphasis on the SWS physical architecture model, preliminary evaluations of system and subsystem performance towards SRSA-2 and accuracy model coordination with subsystems, SRSA-2 progress assessment at KP-2 to verify the SWS preliminary design will be satisfactorily completed and validated through modelbased environments. This will also include action item closure/close out of KP-2 as applicable. FY 2027 increases also support D5LE2 System Level Test and Evaluation (T&E). Increases include defining emulator architecture and planning for emulator interconnectivity, Hardware in the Loop (HWIL) Test Requirements and Test Case Development of Enhanced Grounds Tests (EGT). LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 12 of 42 P-1 Line #2 Volume 1 - 20 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension MDAP/MAIS Code: 178 Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 6,887.533 Less PY Advance Procurement ($ in Millions) 209.997 - Net Procurement (P-1) ($ in Millions) 209.997 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 94.372 73.712 0.000 73.712 - 6,887.533 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - - - - 94.372 73.712 0.000 73.712 - 6,887.533 209.997 FY 2027 Total - - - - 94.372 73.712 0.000 73.712 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - Joint Fuze Sustainment Cost Recurring Cost 1.1.1) Joint Fuze Production - - 309.633 35.989 263 9.465 - - 6.354 - - 0.000 - - 0.000 - - 0.000 1.1.2) Joint Fuze Material/Hardware Procurement - - 134.834 - - 12.037 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 444.467 - - 21.502 - - 6.354 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - Joint Fuze Sustainment Cost - - 444.467 - - 21.502 - - 6.354 - - 0.000 - - 0.000 - - 0.000 (2) - - 2,807.842 - - 49.953 - - 31.330 - - 30.734 - - 0.000 - - 30.734 Subtotal: Recurring Cost - - 2,807.842 - - 49.953 - - 31.330 - - 30.734 - - 0.000 - - 30.734 - - 2,807.842 - - 49.953 - - 31.330 - - 30.734 - - 0.000 - - 30.734 552 859.110 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) Engineering/Support (1) Hardware - Production Support Cost Recurring Cost 2.1.1) Production Support Subtotal: Hardware Production Support Cost Hardware - Guidance Hardware Cost Recurring Cost 3.1.1) Circuit Card Assemblies (CCAs) 1,556.359 LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 13 of 42 P-1 Line #2 Volume 1 - 21 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension MDAP/MAIS Code: 178 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 3.1.2) Interferometric Fiber-Optic Gyro (IFOG) 130.873 1,909 249.836 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.3) Alternate Pendulous Integrating Gyroscope Accelerometer (AltPIGA) 227.190 1,909 433.706 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.4) Guidance Production Support - - 674.039 - - 44.916 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.5) SPALT Assemblies - - 70.320 - - 12.462 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.6) Test Equipment Upgrade - - 22.379 - - 10.875 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2,309.390 - - 68.253 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2,309.390 - - 68.253 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 30 30.677 - - 0.000 30 30.677 Subtotal: Hardware Guidance Hardware Cost Hardware - Fleet Return Missile Electronic SPALT Kits Cost Recurring Cost 4.1.1) Flight Control Electronic Assembly 652.053 342 223.002 897.889 216 193.944 982.848 26 25.554 1,002.505 20 20.050 (†) (4) 718.368 247 177.437 777.297 42 32.646 792.843 31 24.578 - - 0.000 - - 0.000 - - 0.000 4.1.4) Interlocks 1,219.416 286 348.753 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (FCEA) 4.1.2) Missile (†) (3) Inverter 4.1.3) Command Sequencer 1,022.555 1,022.555 4.1.5) Fleet Return Missile Electronics Production Support - - 382.698 - - 12.089 - - 12.060 - - 12.301 - - 0.000 - - 12.301 Subtotal: Recurring Cost - - 1,325.834 - - 70.289 - - 56.688 - - 42.978 - - 0.000 - - 42.978 Subtotal: Hardware - Fleet Return Missile Electronic SPALT Kits Cost - - 1,325.834 - - 70.289 - - 56.688 - - 42.978 - - 0.000 - - 42.978 Gross/Weapon System Cost - - 6,887.533 - - 209.997 - - 94.372 - - 73.712 - - 0.000 - - 73.712 (†) indicates the presence of a P-5a Footnotes: LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 14 of 42 P-1 Line #2 Volume 1 - 22 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension MDAP/MAIS Code: 178 (1) (Cost Element 1.1.1) Joint Fuze Sustainment costs decrease from FY 2026 to FY 2027 due to completed production and assembly of Arming, Fuzing and Firing (AF&F) systems and associated components in FY 2026. (2) (Cost element 2.1.1) Production Support Costs decrease from FY 2026 to FY 2027 as quantity of D5 Life extension procurement hardware decreases, decreasing the D5LE share of the support costs. As the D5LE hardware production efforts conclude, the recurring hardware production support costs, previously cost shared with D5LE then shift to reflect solely supporting Operations and Sustainment hardware production efforts. (3) (Cost Element 4.1.2) Missile Inverter costs increase from FY 2026 to FY 2027 due to quantity increase from 20 to 30. While the final testing capability is relocating in 2026, production was temporarily reduced to a quantity of 20. However, in FY 2027 relocation is complete and production ramps to the required rate of 30 to meet strategic outload requirements. (4) (Cost Element 4.1.3) Command Sequencer costs decrease to $0 as procurement of the final units completed in FY 2026. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 15 of 42 P-1 Line #2 Volume 1 - 23 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 O O C Cost Elements 1.1.1) Joint Fuze Production (†) Engineering/Support 4.1.1) Flight Control Electronic Assembly (FCEA) (†) (†) 4.1.2) Missile Inverter (†) 4.1.2) Missile Inverter (†) 4.1.2) Missile Inverter (†) 4.1.2) Missile Inverter (†) 4.1.2) Missile Inverter (†) 4.1.3) Command Sequencer (†) 4.1.3) Command Sequencer (†) 4.1.3) Command Sequencer (†) 4.1.3) Command Sequencer (†) P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 Department of Energy (DOE) / Kanas City, MO MIPR SSP - Washington Navy Yard Oct 2024 May 2025 263 35.989 Y 2023 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2022 Nov 2024 50 690.879 Y 2023 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2022 Jan 2025 25 944.683 Y 2024 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2023 Jan 2026 26 963.576 Y 2025 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2024 Jan 2027 26 982.848 Y 2026 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy YardSSP Washington Navy Ya Nov 2025 Jan 2028 20 1,002.505 Y 2027 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2026 Jan 2029 30 1,022.555 Y 2023 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2022 Feb 2025 43 747.114 Y 2024 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2023 Feb 2026 42 762.056 Y 2025 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2024 Feb 2027 42 777.297 Y 2026 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2025 Feb 2028 31 792.843 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 16 of 42 P-1 Line #2 Volume 1 - 24 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) Joint Fuze Production Engineering/Support 1 2025 NAVY Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension 263 0 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 263 263 4.1.1) Flight Control Electronic Assembly (FCEA) Prior Years Deliveries: 292 2 2023 NAVY 4.1.2) Missile Inverter 50 0 50 A - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - - - - - - - 50 - - - - - - - - - - - 25 A - - - - - - - - - - - 26 (3) Prior Years Deliveries: 165 4 2023 NAVY 25 0 25 4 2024 NAVY 26 0 26 4 2025 NAVY 26 0 26 26 3 2026 NAVY 20 0 20 20 3 2027 NAVY 30 0 30 30 4.1.3) Command Sequencer (4) Prior Years Deliveries: 162 6 2023 NAVY 43 0 43 6 2024 NAVY 42 0 42 6 2025 NAVY 42 0 42 5 2026 NAVY 31 0 31 A - - - - - - - - - - - - - - - - - - - - - - 43 A - - - - - - - - - - - 42 42 31 O C T LI 1250 - TRIDENT II Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 25 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) Joint Fuze Production Engineering/Support 1 2025 NAVY Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension 263 0 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 263 A - - - - - - - 21 22 22 22 22 22 4 4 4 4 4 4 22 22 22 22 22 22 0 4.1.1) Flight Control Electronic Assembly (FCEA) Prior Years Deliveries: 292 2 2023 NAVY 4.1.2) Missile Inverter 50 0 50 - 5 5 4 4 4 4 0 (3) Prior Years Deliveries: 165 4 2023 NAVY 25 0 25 - - - 4 2024 NAVY 26 0 26 - - - - - - - - - - - - - - - 4 2025 NAVY 26 0 26 A - - - - - - - - - - - - - - - - - - - - - - - 26 3 2026 NAVY 20 0 20 A - - - - - - - - - - - 20 3 2027 NAVY 30 0 30 4.1.3) Command Sequencer 3 2 2 2 2 2 2 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 8 30 (4) Prior Years Deliveries: 162 6 2023 NAVY 43 0 43 - - - - 6 2024 NAVY 42 0 42 - - - - - - - - - - - - - 6 2025 NAVY 42 0 42 A - - - - - - - - - - - - 5 2026 NAVY 31 0 31 O C T LI 1250 - TRIDENT II Mods Navy N O V D E C J A N 3 F E B 3 M A R 3 A P R 3 M A Y 3 J U N 4 J U L 4 A U G UNCLASSIFIED Page 18 of 42 4 S E P 4 O C T 4 4 4 0 - - - - - - - - - - - - - - 42 A - - - - - - - - - - - 31 N O V D E C J A N 3 F E B P-1 Line #2 3 M A R 3 A P R 3 M A Y 3 J U N 3 J U L 4 A U G 4 16 S E P Volume 1 - 26 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) Joint Fuze Production Engineering/Support 1 2025 NAVY Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension 263 263 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 0 0 0 4.1.1) Flight Control Electronic Assembly (FCEA) Prior Years Deliveries: 292 2 2023 NAVY 4.1.2) Missile Inverter 50 50 0 (3) Prior Years Deliveries: 165 4 2023 NAVY 25 25 0 4 2024 NAVY 26 18 8 4 2025 NAVY 26 0 26 - - - 3 2026 NAVY 20 0 20 - - - - - - - - - - - - - - - 3 2027 NAVY 30 0 30 A - - - - - - - - - - - - - - 4.1.3) Command Sequencer 0 2 3 3 0 2 2 2 2 2 2 2 2 2 2 3 3 0 2 2 - 2 - 2 - 2 - 2 - 2 - 2 - 1 - - 3 30 (4) Prior Years Deliveries: 162 6 2023 NAVY 43 43 0 6 2024 NAVY 42 26 16 0 6 2025 NAVY 42 0 42 - - - - 5 2026 NAVY 31 0 31 - - - - 4 O C T LI 1250 - TRIDENT II Mods Navy 4 N O V 4 D E C 4 J A N 0 3 3 F E B 3 M A R 3 A P R 3 M A Y 3 J U N 4 J U L 4 A U G UNCLASSIFIED Page 19 of 42 4 S E P 4 O C T 4 N O V 4 D E C 0 J A N 3 F E B P-1 Line #2 3 M A R 3 A P R 3 M A Y 3 J U N 3 J U L 3 A U G 2 S E P Volume 1 - 27 8 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) Joint Fuze Production Engineering/Support 1 2025 NAVY Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension 263 263 Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 0 0 4.1.1) Flight Control Electronic Assembly (FCEA) Prior Years Deliveries: 292 2 2023 NAVY 4.1.2) Missile Inverter 50 50 0 0 (3) Prior Years Deliveries: 165 4 2023 NAVY 25 25 0 0 4 2024 NAVY 26 26 0 0 4 2025 NAVY 26 26 0 3 2026 NAVY 20 17 3 3 2027 NAVY 30 0 30 4.1.3) Command Sequencer 0 1 1 - 1 - 0 - 2 3 3 2 2 2 3 2 3 2 3 3 0 (4) Prior Years Deliveries: 162 6 2023 NAVY 43 43 0 0 6 2024 NAVY 42 42 0 0 6 2025 NAVY 42 42 0 5 2026 NAVY 31 23 8 0 2 O C T LI 1250 - TRIDENT II Mods Navy 2 N O V 2 D E C 2 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 28 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Item Number / Title [DODIC]: 1 / TRIDENT II Mods - D5 Life Extension Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Department of Energy (DOE) - Kanas City, MO 29 200 300 9 1 6 7 9 1 6 7 2 Lockheed Martin - Waterton, CO 12 36 72 9 1 24 25 9 1 24 25 3 Lockheed Martin Sunnyvale, CA 12 36 48 9 1 26 27 9 1 26 27 4 Lockheed Martin - Waterton, CO 12 36 48 9 1 26 27 9 1 26 27 5 Lockheed Martin Sunnyvale, CA 12 36 72 9 1 27 28 9 1 27 28 6 Lockheed Martin - Waterton, CO 12 36 72 9 1 27 28 9 1 27 28 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 21 of 42 P-1 Line #2 Volume 1 - 29 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 8,241.059 Less PY Advance Procurement ($ in Millions) 777.853 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 1,176.456 - 0.000 - 873.363 1,176.456 - 1,176.456 - 777.853 FY 2027 Total 0.000 - 873.363 - 8,241.059 - - 777.853 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 873.363 - 8,241.059 FY 2027 Base - 1,176.456 - 1,176.456 - 0.000 1,176.456 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Support - Support Cost Cost 1.1) Warhead - - 1,956.937 - - 66.597 - - 76.668 - - 101.863 - - 0.000 - - 101.863 - - 147.018 - - 26.517 - - 32.895 - - 40.356 - - 0.000 - - 40.356 - - 883.518 - - 43.321 - - 123.736 - - 147.954 - - 0.000 - - 147.954 - - 300.579 - - 8.011 - - 8.583 - - 8.755 - - 0.000 - - 8.755 - - 728.663 - - 44.331 - - 45.218 - - 71.427 - - 0.000 - - 71.427 1.6) EOP Missile and Guidance Costs - - 47.660 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Support Cost Cost - - 4,064.375 - - 188.777 - - 287.100 - - 370.355 - - 0.000 - - 370.355 17,151.350 160 2,744.216 20,056.267 15 300.844 20,073.692 13 260.958 20,684.786 12 248.217 - - 0.000 20,684.786 12 248.217 2,085.988 171 356.704 2,346.557 13 30.505 4,466.667 12 53.600 4,556.000 15 68.340 - - 0.000 4,556.000 15 68.340 - - 229.059 - - 22.433 - - 19.210 - - 21.467 - - 0.000 - - 21.467 - - 11.520 - - 17.396 - - 21.862 - - 34.032 - - 0.000 - - 34.032 Components (5) 1.2) Mk4B Shape Stable Nose Tip (SSNT) (6) 1.3) Tooling, Test/ Support Equipment (7) 1.4) System Integration & Planning 1.5) Supportability Mods/ SPALT Insertion (8) Support - Solid Rocket Motors and PBCS Cost 2.1) Solid Rocket (†) (9) Motors 2.2) Post Boost Control System (PBCS) 2.3) HMX (†) (10) (11) 2.4) Ordnance (12) LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 22 of 42 P-1 Line #2 Volume 1 - 30 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) (13) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 22.246 - - 26.859 - - 27.396 - - 41.900 - - 0.000 - - 41.900 - - 554.218 - - 5.389 - - 7.421 - - 16.798 - - 0.000 - - 16.798 - - 0.000 - - 0.000 - - 13.800 - - 21.114 - - 0.000 - - 21.114 - - 0.000 - - 0.000 - - 0.000 - - 7.621 - - 0.000 - - 7.621 - - 3,917.963 - - 403.426 - - 404.247 - - 459.489 - - 0.000 - - 459.489 - - 3.469 - - 2.477 - - 3.551 - - 5.624 - - 0.000 - - 5.624 - - 3.469 - - 2.477 - - 3.551 - - 5.624 - - 0.000 - - 5.624 4.1) Additional Movement/Transport/ Storage/Equip - - 37.400 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - New Start Cost - - 37.400 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 166.852 - - 81.173 - - 102.294 - - 218.067 - - 0.000 - - 218.067 - - 166.852 - - 81.173 - - 102.294 - - 218.067 - - 0.000 - - 218.067 6.1) Guidance Repair Parts - - 0.000 - - 0.000 - - 3.612 - - 3.685 - - 0.000 - - 3.685 Subtotal: Support Guidance Repair Parts Cost - - 0.000 - - 0.000 - - 3.612 - - 3.685 - - 0.000 - - 3.685 2.5) Controls 2.6) Other (14) 2.7) Post Boost Control System (PBCS) Requalification (15) 2.8) Obsolescence Management - Post Boost Control System (PBCS) (16) Subtotal: Support - Solid Rocket Motors and PBCS Cost Support - Electronics Cost 3.1) Electronics (17) Subtotal: Support Electronics Cost Support - New Start Cost Support - Production Support Cost 5.1) Production Support (18) Subtotal: Support Production Support Cost Support - Guidance Repair Parts Cost Support - Industrial Base Sub-Tier Recapitalization - Strategic Solid Rocket Motor Cost 7.1) SRM Chamber / Case Modernization (19) 7.2) SRM Igniter / Nozzle Modernization (20) - - 36.300 - - 18.000 - - 21.500 - - 0.000 - - 0.000 - - 0.000 - - 1.800 - - 4.500 - - 17.500 - - 0.000 - - 0.000 - - 0.000 LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 23 of 42 P-1 Line #2 Volume 1 - 31 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 7.3) SRM Propellant / Energetics Modernization - - 12.900 - - 35.500 - - 25.206 - - 0.000 - - 0.000 - - 0.000 7.4) SRM Small Motor / Ordnance Modernization - - 0.000 - - 34.000 - - 0.000 - - 12.000 - - 0.000 - - 12.000 7.5) HMX Capacity - - 0.000 - - 10.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 45.000 - - 0.000 - - 45.000 - - 0.000 - - 0.000 - - 0.000 - - 52.709 - - 0.000 - - 52.709 - - 51.000 - - 102.000 - - 64.206 - - 109.709 - - 0.000 - - 109.709 - - 0.000 - - 0.000 - - 8.353 - - 9.527 - - 0.000 - - 9.527 Subtotal: Support - Missile Industrial Facilities Cost - - 0.000 - - 0.000 - - 8.353 - - 9.527 - - 0.000 - - 9.527 Gross/Weapon System Cost - - 8,241.059 - - 777.853 - - 873.363 - - 1,176.456 - - 0.000 - - 1,176.456 (21) (22) 7.6) PBCS Modernization (23) 7.7) Production Re-Starts (24) Subtotal: Support Industrial Base Sub-Tier Recapitalization - Strategic Solid Rocket Motor Cost Support - Missile Industrial Facilities Cost 8.1) Capital Maintenance (25) (†) indicates the presence of a P-5a Footnotes: (5) (Cost element 1.1) Warhead Components increase from FY 2026 to FY 2027 due to increase production of RF components and requalification efforts for the Mk4 Thruster Pad and the Bolt Catcher Assembly. FY 2027 also commences the Mk5 JTA Transmission Line production, and adds production efforts for simplified release assembly conversions, release assembly disassembly, and Mk5 Alt 370 reentry body assembly simulator SPALT Conversions. (6) (Cost element 1.2) Mk4B Shape Stable Nose Tip (SSNT) increase ($7.461M) supports increased production of tactical MK4B nose plug billets and reentry body cable assemblies to include Mk4A inert heads (IH) and internal fault detector connector. FY 2026 to FY 2027 costs increase to meet fleet strategic requirements. In addition, is the production of the Navy Experimental Surveillance Test (NEST) which supports flight tests by gathering performance data to inform aerodynamic modeling. (7) (Cost element 1.3) Tooling, Test/Support Equipment cost increases to fund two critical refreshes for aging test consoles including a Teradyne testers refresh used for testing critical electronic components and systems and a refresh of the High Energy Computed Tomography (HECT) work center at SWFLANT, which is used for testing solid rocket motors. Additional major test support equipment procurements in FY 2027 include Destruct Test Set, System Instrumentation Test Unit, Destruct Initiation Unit test console, Mk5 Test Console, Interconnect Test System, and Hosted Virtual Desktop Simulator test console, all of which are used to validate production hardware. Non test support equipment being procured in 2027 includes Guidance Installation Carriage, D5 Aerospike Protective Cap, Nose Fairing Dolly, and Access Seal Cover. The specific scope of the Tooling, Test/Support Equipment cost element fluctuates annually based upon specific tooling and test support equipment refreshes and procurement needs. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 24 of 42 P-1 Line #2 Volume 1 - 32 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs MDAP/MAIS Code: (8) (Cost element 1.5) Supportability Mods/SPALT Insertion increases from FY 2026 to FY 2027 to support additional missile processing activities at both Strategic Weapons Facility Atlantic (SWFLANT) and Strategic Weapons Facility Pacific (SWFPAC) to include increased assembly, disassembly, and testing for SPALT insertions in support of the expanded sea leg capacity, required in order to meet strategic objectives. (9) (Cost element 2.1) Solid Rocket Motors (SRM) quantities decrease from 13 in FY 2026 to 12 in FY 2027 to support strategic requirements. Increase in unit cost is due to high escalation of material and production costs. This decrease in procurement quantity in FY 2027 is due to production capacity strain as D5LE2 boost rocket motor special test unit procurements occur in this year and efforts to increase production capacity at the contractor are in progress and expected to be concluded by FY 2029. (10) (11) (12) (Cost element 2.2) Post Boost Control System (PBCS) quantities increase from 12 in FY 2026 to 15 in FY 2027. Increase PBCS quantities required to support expanded sea leg capacity. (Cost element 2.3) HMX costs increase due to additional procurements of Post Boost Control System Gas Generators. (Cost element 2.4) Ordnance costs increase ($12.170M) due to Separation Linear Shape Charge (SLSC) requalification efforts to replace the obsolete polyurethane foam material. SLSC is critical as it enables reliable and precise motor separation during flight. Beginning in FY 2027 two Velocity of Detonation (VOD) test consoles are being built in support of Flexible Linear Shape Charge (FLSC) and SLSC. Additionally, in FY 2027 is the ongoing requalification efforts of the Test Line and Linear Ordnance System (LOS) and Through Bulkhead Initiator (TBI). (13) (Cost element 2.5) Controls cost increases in FY 2027 due to the requalification of the First Stage (FS) Servo Actuator Assembly (SAA) production line, as a result of the production facility relocation. In addition, in FY 2027 is the design and implementation of an on-demand testing for the SAA and Gas Hydraulic Assembly (GHA). (14) (Cost element 2.6) Other costs increase in FY 2027 to fund the rayon replacement evaluation, as existing procurements are projected to be exhausted by the early FY 2030s. Material evaluations are required in FY 2027 in order to support full scale requalification efforts for the new material by FY 2029. The type of rayon for these efforts is a highly specialized material critical for protecting rocket motor components from the extreme heat and erosive forces of propellant exhaust. (15) (Cost element 2.7) Post Boost Control System (PBCS) Requalification costs increase in FY 2027 in order to modify space-rated hardware, specifically the Intravehicular Activity (IVA) suits and manifolds, for ground use. The Inert Component Ground Conversion Qualification is a required step to perform the full system requalification test for the new PBCS cases. (16) (Cost element 2.8) Obsolescence Management for Post Boost Control System efforts in FY 2027 includes management of current known obsolescence issues such as o-rings, curing agents, antioxidants, and resin binders and the identification of possible obsolescence issues in future years. (17) (18) (Cost element 3.1) Electronics cost increase in FY 2027 due to material cost increases for primary batteries. (Cost element 5.1) Production Support increases from FY 2026 to FY 2027 as the Trident program increases production of components to support expanded sea leg capacity, implements new tools including Classified Stockpile Management Software (SMS) implementation of a digital tool for re-entry body planning and inventory management needed to expedite SWF planning efforts, especially as it pertains to fleet schedule changes, expands efforts in the areas of component sustainment to ensure production continuity for the Trident program in the face of a limited industrial base. As the program complexity increases with multiple large scale requalification and industrial base expansion and enhancement efforts commence on top of program production efforts, program management and planning support increases to manage the multiple large scale efforts. Additionally, costs increase for Test Missile Kit as the program commences the Test Missile Kit Alternate TMK Architecture (ATA) SPALT which is an architectural change to the TMK Flight Termination System (FTS) to enhance SSBN safety during a flight test event while balancing range and public safety. (19) (20) (21) (22) (Cost element 7.1) SRM Chamber/Case Modernization costs decrease due to the effort ending in FY 2026. (Cost element 7.2) SRM Igniter/Nozzle costs decrease due to the effort ending in FY 2026. (Cost element 7.3) SRM Propellant/Energetics Modernization costs decrease due to the effort ending in FY 2026. (Cost element 7.4) SRM Small Motor and Ordnance Modernization costs increase in FY 2027 for Third Stage Eject Motor and Nose Fairing Jettison Motor efforts. This provides for sub-tier supplier tooling procurements and more efficient production processes to decrease single points of failure of the production line. (23) (Cost element 7.6) Post Boost Control System (PBCS) modernization efforts begin in FY 2027 to address aging equipment and obsolete materials that are creating capacity limitations, which directly constrain operational readiness and mission effectiveness. The modernization initiative will address both quantitative production capacity improvements, including enhanced manufacturing throughput, and qualitative upgrades necessary to integrate contemporary technologies and materials into current systems. FY 2027 funds sub-tier supplier improvements to include upgrading tooling and processes with updated technical methods and materials and adding an alternative insulation supplier to improve supply chain constraints with current supplier. Additionally, there will be process improvements, feasibility LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 25 of 42 P-1 Line #2 Volume 1 - 33 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs MDAP/MAIS Code: assessments and trade studies will occur to review the low-cost manifold (LCM), elbow and igniter case, digital X-ray conversion, grain face formers and compression molding. Efforts to update and digitize tool drawings will occur to convert all paper drawings to computer-aided design (CAD) models required for the procurement of new tooling. (24) (Cost element 7.7) Production restarts FY 2027 efforts include pre-restart producibility assurance and planning phase to include: vendor assessments, modernize production drawings and investigations to resolve any producibility challenges prior to initiating the requalification process. The production restart process will begin with the following safety-critical commodities: First Stage (FS) Firing Unit, Umbilical Distribution Unit, Power Distribution Unit and FS Thrust Vector Control (TVC) Gas Hydraulic Assembly (GHA); and the following commodities related to the reliability of the missile: Second Stage (SS) TVC GHA, SS Firing Unit and TS Firing Unit. (25) (Cost element 8.1) Capital Maintenance FY 2027 projects at the Bacchus NIROP facilities will replace building utility transformers and switchgear in buildings (46A & 59); perform caternary lightning protection system updates to buildings (37 & CD9A); building power/utility supply connections compliance to buildings (46A & 10A); replace HVAC/process chiller in building (47A); replace supervisory control and data acquisition (SCADA) HVAC controls in building (7A); perform hypalon roof membrane replacement on buildings (35 & 10A); repair walking and working surfaces for building (49A); SCADA updates to buildings (63 & 64); perform network communication replacement phase 8; perform building interior/exterior painting to building (18); as well as perform NIROP emergent capital maintenance and utility replacements. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 26 of 42 P-1 Line #2 Volume 1 - 34 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors (†) 2.1) Solid Rocket Motors 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) LI 1250 - TRIDENT II Mods Navy O O C P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs FY Contractor and Location Method/Type or Funding Vehicle 2016 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2015 Feb 2019 12 16,366.750 Y 2017 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2016 Feb 2020 12 16,677.750 Y 2018 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2017 Feb 2021 12 16,994.571 Y 2019 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2018 Feb 2022 12 17,317.500 Y 2020 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2019 Feb 2023 12 17,646.500 Y 2021 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2020 Feb 2024 12 17,981.786 Y 2022 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2021 Feb 2025 12 18,323.500 Y 2023 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2022 Dec 2025 12 18,689.970 Y 2024 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2023 Dec 2026 12 19,063.769 Y 2025 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2024 Dec 2027 15 20,056.267 Y 2026 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2025 Dec 2028 13 20,073.692 Y 2027 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2026 Dec 2029 12 20,684.786 Y 2016 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2015 Feb 2019 12 1,975.083 Y 2017 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2016 Feb 2020 12 2,012.583 Y 2018 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2017 Feb 2021 14 2,050.857 Y 2019 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2018 Feb 2022 14 2,089.786 Y 2020 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2019 Feb 2023 14 2,129.500 Y 2021 Lockheed Martin / Sunnyvale, CA Various SSP - Washington Navy Yard Nov 2020 Feb 2024 14 2,170.000 Y Location of PCO UNCLASSIFIED Page 27 of 42 Award Date Date of First Delivery P-1 Line #2 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 35 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) 2.2) Post Boost Control System (†) (PBCS) (†) O O C P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs FY Contractor and Location Method/Type or Funding Vehicle 2022 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2021 Feb 2025 14 2,211.214 Y 2023 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2022 Feb 2026 12 2,255.438 Y 2024 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2023 Feb 2027 13 2,300.546 Y 2025 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2024 Feb 2028 13 2,346.557 Y 2026 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2025 Feb 2029 12 4,466.667 Y 2027 Lockheed Martin / Waterton, CO Various SSP - Washington Navy Yard Nov 2026 Feb 2030 15 4,556.000 Y Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 28 of 42 P-1 Line #2 Volume 1 - 36 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 0 12 1 2017 NAVY 12 0 12 1 2018 NAVY 12 0 12 12 1 2019 NAVY 12 0 12 12 1 2020 NAVY 12 0 12 12 1 2021 NAVY 12 0 12 12 2 2022 NAVY 12 0 12 12 2 2023 NAVY 12 0 12 12 2 2024 NAVY 12 0 12 12 2 2025 NAVY 15 0 15 15 1 2026 NAVY 13 0 13 13 1 2027 NAVY 12 0 12 12 2.2) Post Boost Control System (PBCS) A - - - - - - - - - - - - - - - - - - - - - - - 12 A - - - - - - - - - - - 12 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 0 12 3 2017 NAVY 12 0 12 A - 3 2018 NAVY 14 0 14 14 3 2019 NAVY 14 0 14 14 3 2020 NAVY 14 0 14 14 3 2021 NAVY 14 0 14 14 4 2022 NAVY 14 0 14 14 4 2023 NAVY 12 0 12 12 4 2024 NAVY 13 0 13 13 4 2025 NAVY 13 0 13 13 4 2026 NAVY 12 0 12 12 4 2027 NAVY 15 0 15 - - - - - - - - - - - - - - - - - - - - - 12 A - - - - - - - - - - - 12 15 O C T LI 1250 - TRIDENT II Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 37 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 0 12 - - - - - - - - - - - - - - - - 1 2017 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 1 2018 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - - 12 1 2019 NAVY 12 0 12 A - - - - - - - - - - - 12 1 2020 NAVY 12 0 12 12 1 2021 NAVY 12 0 12 12 2 2022 NAVY 12 0 12 12 2 2023 NAVY 12 0 12 12 2 2024 NAVY 12 0 12 12 2 2025 NAVY 15 0 15 15 1 2026 NAVY 13 0 13 13 1 2027 NAVY 12 0 12 12 2.2) Post Boost Control System (PBCS) 1 1 1 1 1 1 1 1 4 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 0 12 - - - - - - - - - - - - - - - - 3 2017 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 3 2018 NAVY 14 0 14 A - - - - - - - - - - - - - - - - - - - - - - - 14 3 2019 NAVY 14 0 14 A - - - - - - - - - - - 14 3 2020 NAVY 14 0 14 14 3 2021 NAVY 14 0 14 14 4 2022 NAVY 14 0 14 14 4 2023 NAVY 12 0 12 12 4 2024 NAVY 13 0 13 13 4 2025 NAVY 13 0 13 13 4 2026 NAVY 12 0 12 12 4 2027 NAVY 15 0 15 1 1 1 1 1 1 1 4 15 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 30 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 38 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 8 4 1 2017 NAVY 12 0 12 - - - - 1 2018 NAVY 12 0 12 - - - - - - - - - - - - - - - - 1 2019 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 1 2020 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - - 12 1 2021 NAVY 12 0 12 A - - - - - - - - - - - 12 2 2022 NAVY 12 0 12 12 2 2023 NAVY 12 0 12 12 2 2024 NAVY 12 0 12 12 2 2025 NAVY 15 0 15 15 1 2026 NAVY 13 0 13 13 1 2027 NAVY 12 0 12 12 2.2) Post Boost Control System (PBCS) 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 4 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 8 4 3 2017 NAVY 12 0 12 - 1 - - - 3 2018 NAVY 14 0 14 - - - - - - - - - - - - - - - - 3 2019 NAVY 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 3 2020 NAVY 14 0 14 A - - - - - - - - - - - - - - - - - - - - - - - 14 3 2021 NAVY 14 0 14 A - - - - - - - - - - - 14 4 2022 NAVY 14 0 14 14 4 2023 NAVY 12 0 12 12 4 2024 NAVY 13 0 13 13 4 2025 NAVY 13 0 13 13 4 2026 NAVY 12 0 12 12 4 2027 NAVY 15 0 15 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 6 15 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 31 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 39 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 12 0 1 2017 NAVY 12 12 0 1 2018 NAVY 12 8 4 1 2019 NAVY 12 0 12 - - - - 1 2020 NAVY 12 0 12 - - - - - - - - - - - - - - - - 1 2021 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 2 2022 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - - 12 2 2023 NAVY 12 0 12 A - - - - - - - - - - - 12 2 2024 NAVY 12 0 12 12 2 2025 NAVY 15 0 15 15 1 2026 NAVY 13 0 13 13 1 2027 NAVY 12 0 12 12 0 2.2) Post Boost Control System (PBCS) 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 4 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 12 0 3 2017 NAVY 12 12 0 3 2018 NAVY 14 8 6 3 2019 NAVY 14 0 14 - - - - 3 2020 NAVY 14 0 14 - - - - - - - - - - - - - - - - 3 2021 NAVY 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 4 2022 NAVY 14 0 14 A - - - - - - - - - - - - - - - - - - - - - - - 14 4 2023 NAVY 12 0 12 A - - - - - - - - - - - 12 4 2024 NAVY 13 0 13 13 4 2025 NAVY 13 0 13 13 4 2026 NAVY 12 0 12 12 4 2027 NAVY 15 0 15 0 1 2 2 0 2 2 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 6 15 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 32 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 40 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 12 0 0 1 2017 NAVY 12 12 0 0 1 2018 NAVY 12 12 0 0 1 2019 NAVY 12 12 0 1 2020 NAVY 12 8 4 1 2021 NAVY 12 0 12 - - - - 2 2022 NAVY 12 0 12 - - - - - - - - - - - - - - - - 2 2023 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 2 2024 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - - 12 2 2025 NAVY 15 0 15 A - - - - - - - - - - - 15 1 2026 NAVY 13 0 13 13 1 2027 NAVY 12 0 12 12 2.2) Post Boost Control System (PBCS) 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 4 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 12 0 0 3 2017 NAVY 12 12 0 0 3 2018 NAVY 14 14 0 0 3 2019 NAVY 14 14 0 3 2020 NAVY 14 8 6 3 2021 NAVY 14 0 14 - - - - 4 2022 NAVY 14 0 14 - - - - - - - - - - - - - - - - 4 2023 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 4 2024 NAVY 13 0 13 A - - - - - - - - - - - - - - - - - - - - - - - 13 4 2025 NAVY 13 0 13 A - - - - - - - - - - - 13 4 2026 NAVY 12 0 12 4 2027 NAVY 15 0 15 0 1 2 2 0 2 2 1 1 1 1 1 1 1 1 1 1 0 2 2 1 1 1 1 1 1 4 12 15 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 41 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 12 0 0 1 2017 NAVY 12 12 0 0 1 2018 NAVY 12 12 0 0 1 2019 NAVY 12 12 0 0 1 2020 NAVY 12 12 0 0 1 2021 NAVY 12 12 0 2 2022 NAVY 12 8 4 2 2023 NAVY 12 0 12 - - 2 2024 NAVY 12 0 12 - - - - - - - - - - - - - - 2 2025 NAVY 15 0 15 - - - - - - - - - - - - - - - - - - - - - - - - 15 1 2026 NAVY 13 0 13 A - - - - - - - - - - - - - - - - - - - - - - - 13 1 2027 NAVY 12 0 12 A - - - - - - - - - - - 12 2.2) Post Boost Control System (PBCS) 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 2 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 12 0 0 3 2017 NAVY 12 12 0 0 3 2018 NAVY 14 14 0 0 3 2019 NAVY 14 14 0 0 3 2020 NAVY 14 14 0 0 3 2021 NAVY 14 14 0 4 2022 NAVY 14 10 4 4 2023 NAVY 12 0 12 - - - - 4 2024 NAVY 13 0 13 - - - - - - - - - - - - - - - - 4 2025 NAVY 13 0 13 - - - - - - - - - - - - - - - - - - - - - - - - 13 4 2026 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - - 12 4 2027 NAVY 15 0 15 A - - - - - - - - - - - 15 0 1 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V 1 D E C 1 J A N 0 1 F E B 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 34 of 42 1 S E P 1 O C T 1 N O V 1 D E C 1 J A N 0 2 F E B P-1 Line #2 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G 1 4 S E P Volume 1 - 42 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (9) Prior Years Deliveries: 52 1 2016 NAVY 12 12 0 0 1 2017 NAVY 12 12 0 0 1 2018 NAVY 12 12 0 0 1 2019 NAVY 12 12 0 0 1 2020 NAVY 12 12 0 0 1 2021 NAVY 12 12 0 0 2 2022 NAVY 12 12 0 0 2 2023 NAVY 12 12 0 2 2024 NAVY 12 10 2 2 2025 NAVY 15 0 15 - - 1 2026 NAVY 13 0 13 - - - - - - - - - - - - - - 1 2027 NAVY 12 0 12 - - - - - - - - - - - - - - 2.2) Post Boost Control System (PBCS) 0 1 1 0 1 1 1 1 1 1 1 2 2 1 1 2 0 2 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - - 2 12 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 12 0 0 3 2017 NAVY 12 12 0 0 3 2018 NAVY 14 14 0 0 3 2019 NAVY 14 14 0 0 3 2020 NAVY 14 14 0 0 3 2021 NAVY 14 14 0 0 4 2022 NAVY 14 14 0 0 4 2023 NAVY 12 12 0 4 2024 NAVY 13 9 4 4 2025 NAVY 13 0 13 - - - - 4 2026 NAVY 12 0 12 - - - - - - - - - - - - - - - - 4 2027 NAVY 15 0 15 - - - - - - - - - - - - - - - - 0 1 O C T LI 1250 - TRIDENT II Mods Navy 1 N O V 1 D E C 1 J A N 0 2 F E B 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 35 of 42 1 S E P 1 O C T 1 N O V 1 D E C 1 J A N 0 1 1 F E B P-1 Line #2 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G - 4 15 S E P Volume 1 - 43 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 2.1) Solid Rocket Motors PROC QTY Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (9) Prior Years Deliveries: 52 1 2016 NAVY 12 12 0 0 1 2017 NAVY 12 12 0 0 1 2018 NAVY 12 12 0 0 1 2019 NAVY 12 12 0 0 1 2020 NAVY 12 12 0 0 1 2021 NAVY 12 12 0 0 2 2022 NAVY 12 12 0 0 2 2023 NAVY 12 12 0 0 2 2024 NAVY 12 12 0 0 2 2025 NAVY 15 15 0 1 2026 NAVY 13 11 2 1 2027 NAVY 12 0 12 2.2) Post Boost Control System (PBCS) 0 1 1 - 0 - 1 1 1 1 1 1 1 1 1 1 1 1 0 (10) Prior Years Deliveries: 52 3 2016 NAVY 12 12 0 0 3 2017 NAVY 12 12 0 0 3 2018 NAVY 14 14 0 0 3 2019 NAVY 14 14 0 0 3 2020 NAVY 14 14 0 0 3 2021 NAVY 14 14 0 0 4 2022 NAVY 14 14 0 0 4 2023 NAVY 12 12 0 0 4 2024 NAVY 13 13 0 0 4 2025 NAVY 13 13 0 4 2026 NAVY 12 8 4 4 2027 NAVY 15 0 15 0 1 O C T LI 1250 - TRIDENT II Mods Navy 1 1 N O V 1 D E C 0 J A N 1 F E B 2 M A R 1 A P R 1 M A Y 2 J U N 1 J U L 1 A U G UNCLASSIFIED Page 36 of 42 2 S E P 1 O C T 1 N O V 1 D E C 1 J A N 0 F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 44 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 Item Number / Title [DODIC]: 2 / TRIDENT II Mods -Operating and Support Costs Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin Sunnyvale, CA 12 14 18 9 1 37 38 9 1 37 38 2 Lockheed Martin - Waterton, CO 12 14 18 0 1 37 38 9 1 37 38 3 Lockheed Martin Sunnyvale, CA 12 14 18 9 1 37 38 9 1 37 38 4 Lockheed Martin - Waterton, CO 12 14 18 9 1 37 38 9 1 37 38 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 37 of 42 P-1 Line #2 Volume 1 - 45 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / D5LE2 [D5LE2] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 329.726 Less PY Advance Procurement ($ in Millions) 806.017 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 2,662.099 - 0.000 - 1,573.977 2,662.099 - 2,662.099 - 806.017 FY 2027 Total 0.000 - 1,573.977 - 329.726 - - 806.017 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 1,573.977 - 329.726 FY 2027 Base - 2,662.099 - 2,662.099 - 0.000 2,662.099 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Support - Missile Redesign Cost 1.1) Airframe (26) 1.2) Propulsion (27) 1.3) Electronics and Avionics (28) 1.4) Controls (29) 1.5) Ordnance (30) 1.6) Test Missile Kit (31) 1.7) Systems Engineering (32) 1.8) Test and Evaluation (33) 1.9) System Assembly (34) 1.10) Training & Support Equipment (35) 1.11) Re-Entry Body Integration (36) Subtotal: Support - Missile Redesign Cost - - 20.119 - - 41.919 - - 68.771 - - 137.438 - - 0.000 - - 137.438 - - 0.423 - - 5.949 - - 81.839 - - 70.831 - - 0.000 - - 70.831 - - 42.082 - - 94.306 - - 210.278 - - 484.863 - - 0.000 - - 484.863 - - 12.376 - - 118.152 - - 240.255 - - 414.915 - - 0.000 - - 414.915 - - 1.041 - - 13.514 - - 20.184 - - 12.835 - - 0.000 - - 12.835 - - 32.893 - - 93.072 - - 146.061 - - 184.766 - - 0.000 - - 184.766 - - 61.306 - - 109.253 - - 120.622 - - 141.576 - - 0.000 - - 141.576 - - 6.859 - - 11.059 - - 53.474 - - 100.575 - - 0.000 - - 100.575 - - 2.126 - - 32.669 - - 81.782 - - 143.136 - - 0.000 - - 143.136 - - 0.112 - - 0.076 - - 37.741 - - 143.768 - - 0.000 - - 143.768 - - 3.728 - - 14.834 - - 42.783 - - 59.926 - - 0.000 - - 59.926 - - 183.065 - - 534.803 - - 1,103.790 - - 1,894.629 - - 0.000 - - 1,894.629 Support - Guidance Redesign Cost LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 38 of 42 P-1 Line #2 Volume 1 - 46 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1250 / TRIDENT II Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / D5LE2 [D5LE2] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost 2.1) Systems Engineering ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 12.324 - - 19.489 - - 21.782 - - 32.393 - - 0.000 - - 32.393 - - 7.856 - - 13.901 - - 20.155 - - 24.917 - - 0.000 - - 24.917 - - 33.981 - - 80.701 - - 95.817 - - 101.539 - - 0.000 - - 101.539 - - 21.308 - - 25.244 - - 33.332 - - 117.994 - - 0.000 - - 117.994 (41) - - 17.708 - - 26.985 - - 87.631 - - 91.549 - - 0.000 - - 91.549 2.6) Information Systems / Data - - 1.916 - - 4.989 - - 7.167 - - 14.951 - - 0.000 - - 14.951 - - 4.789 - - 8.995 - - 16.599 - - 22.934 - - 0.000 - - 22.934 - - 1.915 - - 4.989 - - 9.206 - - 21.026 - - 0.000 - - 21.026 - - 101.797 - - 185.293 - - 291.689 - - 427.303 - - 0.000 - - 427.303 (37) 2.2) Algorithms and Software (38) 2.3) Guidance System Hardware (39) 2.4) Radiation Hardened Parts (40) 2.5) Sensors Management (42) 2.7) Test Equipment (43) 2.8) Integration and Test (44) Subtotal: Support Guidance Redesign Cost Support - Ship Interface Cost (45) - - 21.799 - - 39.055 - - 92.777 - - 171.614 - - 0.000 - - 171.614 (46) - - 7.306 - - 15.210 - - 23.457 - - 36.959 - - 0.000 - - 36.959 (47) - - 3.822 - - 9.669 - - 9.736 - - 11.600 - - 0.000 - - 11.600 - - 32.927 - - 63.934 - - 125.970 - - 220.173 - - 0.000 - - 220.173 - - 11.937 - - 21.987 - - 52.528 - - 119.994 - - 0.000 - - 119.994 Subtotal: Support - System Evaluation Cost - - 11.937 - - 21.987 - - 52.528 - - 119.994 - - 0.000 - - 119.994 Gross/Weapon System Cost - - 329.726 - - 806.017 - - 1,573.977 - - 2,662.099 - - 0.000 - - 2,662.099 3.1) Fire Control 3.2) Launcher 3.3) Navigation Subtotal: Support - Ship Interface Cost Support - System Evaluation Cost 4.1) System Evaluation (48) Footnotes: (26) (Cost Element 1.1) Airframe increases in FY 2027 support the completion of Missile Airframe/Structures Preliminary Design Review (PDR) in FY 2027. This hardware procurement is required to support the detailed buildup and delivery of Structures Engineering Development Units (EDUs) which will enable producibility assessments, subsystem model development, and system level integration testing. These system level integration tests will evaluate the response of the below Structures components to various environments that simulate dynamic flight environments. Hardware procurement to support testing includes 3 Equipment Sections, 3 Interstage Sections, 3 Third Stage Motor Skirts, and 3 Nose Fairing Sections, 2 First Stage Nozzle Shield Assembly and 2 Third Stage Nose Cap Snubber Assembly. FY 2027 testing LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 39 of 42 P-1 Line #2 Volume 1 - 47 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / D5LE2 [D5LE2] MDAP/MAIS Code: will contain Structural Test Lab (STL) testing for the Equipment Section (ES), Motor Equipment Module (MEM), Nose Fairing (NF), & Interstage (IS) commodities. Tests will be used to validate the design and structural analysis for the critical load cases such as free hoist, closure impact, surface broach, max flight pressure buckling, etc. as well as converting small-scale prototype builds to EDUs for hardware testing. Additionally, the FY 2027 increase supports the continuation of Phase A requalification efforts for Airframe/Structures components that have been out of production to include: Conduit Covers, Direct Ship Parts and the Nose Cap. (27) (Cost Element 1.2) Propulsion decreases in FY 2027 due to (1) the completion of initial missile level planning, and (2) data products closeout and completion of the Flight subsystem SDR in FY 2026. FY 2027 supports the preparation for and completion of Flight Subsystem PDR, to include survivability evaluation and modeling of functional and physical interfaces. FY 2027 hardware procurements include inert special test vehicles: three (3) first stage inert Rocket Motors, three (3) second stage inert Rocket Motors, three (3) third stage inert Rocket motors and (3) first stage nozzle baffles that will be utilized in system testing. (28) (Cost Element 1.3) Electronics and Avionics increases in FY 2027 to procure 5 missile sets of Tactical Avionics EDUs and procurement of the lower-level electronic parts to continue maturation for strategic radiation hardened parts and to be used in Tactical Avionics AEDU builds. Efforts continue for testing of prototypes and EDU level fidelity hardware of avionics' safety critical packages in order to mature the D5LE2 Missile Electronics and Avionics packages for completion of Flight Subsystem PDR. FY 2027 Critical Avionics Packages and Software procurements include: 5 Addressable Explosive Foil Initiator Firing Units, 5 Primary Electronics Battery, Cables and Connectors, Communication Network, Shipboard Missile Readiness and Test Software, Pressure Transducers, Missile Body Electronic Parts, Separation Sequencer Units, Initiation Assemblies, 5 Power Distribution and Transfer (PDT), 5 Safe Arming and Fuzing Electronics, 5 Removable Initiation Safety Electronics, 5 Initiation and Deploy Electronics, 5 PreBoost Electronics, and 10 Umbilical Distribution Units. Each of these safety critical Avionics Packages support the completion of Tactical Avionics PDR and Flight Subsystem PDR artifacts including: modulelevel schematics, critical circuit-level simulations, preliminary derating analysis for power and radiation effects, preliminary worst-case analyses, and preliminary package test plans. Definition of internal and external interfaces will be completed as well as hardware analyses and testing of the EDUs. Additionally, the FY 2027 increase supports the beginning of Phase A requalification effort for Pressure Transducer components that have been out of production. (29) (Cost Element 1.4) Controls increases in FY 2027 due to the continuation of detailed design and technical maturation of the Post Boost Controls System (PBCS). This includes the procurement of controls components to support hardware designs for the buildup of EDUs, manufacturing and fabrication of Integrated Valve Assemblies (IVA) hardware, Isolation Valve Assembly and Sequence Valve Assembly EDU hardware and completion of component and subsystem testing of Hot-Fire and Hot-Gas EDUs in representative environments prior to system level testing. Procurement quantities include: (3) First Stage (FS) TVC Gas Generators (GG) - Inert, (1) FS TVC GG - Live, (6) FS Servo Actuator Assemblies (SAA) and (3) FS Gas Hydraulic Assemblies (GHA). For the second stage (SS), there are (4) SS TVC GGs - Inert, (1) SS TVC GG - Live, (8) SS SAA, and (4) SS GHA. For the third stage (TS), there are (4) TS TVC GG - Inert, (1) TS TVC GG - Live, (8) TS SAA, and (4) TS GHA. Finally, there are 8 PBCS GG - Inert. Additionally, the FY 2027 increase supports the continuation of requalification efforts for the Aerospike, SS TVC SAA, SS TVC GG, TS TVC GG, TS TVC SAA and TS TVC GHA. (30) (Cost Element 1.5) Ordnance decreases in FY 2027 as efforts complete in developing the model-based prototype design of the High Voltage Detonator-Exploding Foil Initiation (HVD-EFI). FY 2027 also includes support Flight Subsystem PDR activities to design, develop and test an initiation subsystem, which includes the redesign, production requalifications and support for Missile initiation ordnance items and control subsystems inclusive of detonators, initiators, linear shape charges, separation charges, and other associated components. These efforts also flow into completion of the Ordnance subsystem PDR and conduct of Flight Subsystem PDR. Following the model-based prototype design, Hardware procurement of HVD EFIs begins with procurement of 185 inert HVD-EFIs, 200 live HVD-EFIs, and 25 TMK specific inert HVD-EFIs. (31) (Cost Element 1.6) Test Missile Kit 2 (TMK2) increase in FY 2027 is due to hardware development, testing, model validation, parts model coordination, and management of two battery vendors through Flight System PDR. TMK2 increases also include the procurement of antennas, MIL STD piece parts (e.g. switches, transducers), accelerometers, cables, connectors - all of which are required to begin the buildup of EDUs for subsystem and system level testing. The procurements in FY 2027 are: 6 units of Onboard Flight Test, Telemetry, Tracking, and Communications Equipment, 5 inert Test Missile Kits (TMK) and 10 Autonomous Flight Safety Systems (AFTU). Additionally, there are 50 Destruct Initiation Unit (DIU) Assemblies, 5 Destruct Interlocks (DI) Assemblies, 525 Telemetry Sensors, and 20 Transmitters. (32) (Cost Element 1.7) Systems Engineering increases in FY 2027 to support continuation of requirements updates and development of component level specifications and subordinate specifications, further interface definition, Configuration & Data Management, Missile System Integration, Flight Sciences analysis /Specialty Engineering (reliability, accuracy, EM effects, survivability, human factors, etc.) efforts, and Verification assessments in support of Flight Systems PDR, subsystem PDRs, and SRSA-2. (33) (Cost Element 1.8) Test and Evaluation increases in FY 2027 due to increased focus on manning and development of software simulations and emulations as well as X-flight unique support equipment requirements. The Access Stand is a long lead material procurement in FY 2027 and is required to enable experimental (X-Flight) readiness. FY 2027 focuses on LE2 flight performance characteristics and Missile dynamic model development which build on the software simulations and emulations. (34) (Cost Element 1.9) System Assembly increases in FY 2027 are for critical efforts needed at the facilities for D5LE2 execution including: Facility Activation Plan (FAP) development, Facility Equipment requirement development, Facility Design Criteria development, and a comprehensive Activation Integrated Schedule for the Eastern Range, Strategic Weapons Facility Atlantic (SWFLANT), and Strategic Weapons Facility Pacific (SWFPAC). Facility Engineering and Activation support include the critical planning, integration, proofing, and development efforts across the Strategic System Programs Facilities to LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 40 of 42 P-1 Line #2 Volume 1 - 48 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / D5LE2 [D5LE2] MDAP/MAIS Code: activate mission essential facility capabilities needed to execute the D5LE2 program. In FY 2027 increases are due to support: 1) Commencing facility modifications Missile Assembly Building-1 at SWFPAC 2) Design efforts for Missile Inspection Building and Missile Processing Warehouse at SWFPAC 3) Proofing efforts ETF, design efforts for Cape Rail Head, Complex 46, and the MACA buildings at Eastern Range/ Naval Ordnance Test Unit (NOTU) 4) Design efforts for Missile Integrated Support Facility and Missile Assembly Building-3 at SWFLANT (35) (Cost Element 1.10) Training and Support Equipment increases in FY 2027 due to the procurement of electrical and ground test support equipment selected for redesign in support of D5LE2. Support equipment increases in FY 2027 is to procure a common package tester to support Tactical Avionics testing TMK2 integration. Additionally, X-Flight unique support equipment begins refurbishment in FY 2027 to support pad launches in FY 2033. Training increases in FY 2027 includes additional training of personnel to support the concept reviews and requirement definition for the D5LE2 Trainer Program to include Missile subsystem, sub-subsystem and component level testers. (36) (Cost Element 1.11) Reentry Body integration increases in FY 2027 due to reentry hardware procurements for system level and subsystem testing on test vehicles in support of missile development efforts as well as a ramp up in support for pre-test modeling and simulation for system and subsystem level PDRs. Reentry procurements in FY 2027 include: 5 Alternate Release Assembly Structures, 5 Mk4A Separation Cable Assemblies, 8 Mk4B Inert Heads, and 5 Mk4A Alternate Release Assemblies. (37) (Cost Element 2.1) Systems Engineering increases in FY 2027 to support SWS level reviews and to continue the system concept development in support of KP-2 and begin Guidance Subsystem preliminary design efforts in support toward Guidance PDR. This includes Guidance System requirements development and management, architecture development and system trade studies, and maturation of program technical plans and processes, includes Systems Engineering efforts for the Guidance Subsystem including subsystem architecture, design, modeling, simulation & analysis, requirements development, and verification and validation. (38) (Cost Element 2.2) Algorithms and Software increases in FY 2027 to develop preliminary designs for software and navigation algorithms in support of Guidance PDR. Continued efforts include refinement of software environments, processes, and standards, implementing operating system, and processor support, evaluation of software and navigation algorithm prototyping, and simulation architecture, and continued Algorithms and Software development efforts for the Guidance Subsystem. (39) (Cost Element 2.3) Guidance System Hardware increase in FY 2027 to continue for preliminary design efforts in support of Guidance PDR, processor and memory design development, communications and timing hardware technical maturation, electromechanical and platform control prototype development and demonstrations, and electronics packaging development, includes Guidance System Hardware design, development, and test. (40) (Cost Element 2.4) Radiation Hardened (RH) parts increase in FY 2027 for acquisition of prototype hardware. RH parts continues support of part design activities as key technologies achieve suitable technology readiness level (TRL) to support detailed design. Efforts including parts requirements and parts model development, maintenance of the initial RH parts list, RH parts characterization of prototype parts such low voltage analog parts for test and evaluation. Efforts are critical to establish a viable parts catalog and vender base that supports RH Avionics package for preliminary design for both the Missile and Guidance Subsystems. Efforts in this area are tightly coupled with the design and productization of strategic-grade sensors for the Guidance Subsystem. (41) (Cost Element 2.5) Sensors increase in FY 2027 to continue the candidate sensor technology evaluation, support for Guidance System PDR (sensor requirements flowdown, and preliminary design development). Includes radiation hardened sensor development to include accelerometer, gyroscope, optical sensing, sensor evaluation, and timing reference. (42) (Cost Element 2.6) Information Systems/ Data Management (IS/DM) continues in FY 2027 supporting the development of IS/DM Program Plans and refinement of IS/DM requirements. Continue development and deployment of IS/DM infrastructure includes development of Guidance Subsystem Information Systems (IS) and Data Management (DM) systems to include Protocol Data Unit (PDU) Software in the Loop (SWIL) data, Hardware In the Loop (HWIL) data, test data and deployed systems data simulation. (43) (Cost Element 2.7) Test Equipment increases in FY 2027 to continue supporting developmental test equipment requirements and refinement of Test Equipment Management Plan (TEMP). Continue development of test equipment to support prototype testing, includes Guidance Subsystem test equipment planning, architecture, design, and development and preliminary design of system test equipment to support guidance system evaluation. (44) (Cost Element 2.8) Integration and Test increases in FY 2027 in support of integrated test and evaluation of protype hardware in support of preliminary design. Continued support of Integrated Test program planning, continue requirements verification planning, and test facilities development, includes Guidance System integration, test, and evaluation. (45) (Cost Element 3.1) Fire Control increases in FY 2027 to support several planned efforts critical to the D5LE2 program. Key activities include completion of the Fire Control System (FCS) PDR. Production and installation activities for the Engineering Test Station lab begin in FY 2027. Additionally beginning in FY 2027 are the MT9 system design and development efforts, along with production and assembly of the MK99 FCS. FY 2027 also initiates the development of the Fire Control Emulator which will serve as an auxiliary system replicating the D5LE2 FCS interface to the missile. FC Integrated Test Support Suite (FITSS) development will begin in FY 2027 to support a purpose-built Auxiliary system at the launch pad site to support X-flights. (46) (Cost Element 3.2) Launcher increases in FY 2027 to continue production of a launch tube for Engineering Test Facility (ETF). Completion of Knowledge Point 2 (KP2) and preparation for SRSA-2 including Descriptive System Modeling in support of these milestones. Conversion of legacy launcher Technical Data Package to CAD models as record of authority. LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 41 of 42 P-1 Line #2 Volume 1 - 49 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 2 P-1 Line Item Number / Title: 1250 / TRIDENT II Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / D5LE2 [D5LE2] MDAP/MAIS Code: (47) (Cost Element 3.3) Navigation increases in FY 2027 for the procurement and system engineering development of NAV Emulator (NEIS). Continued efforts to develop, integrate, and maintain models and simulations to support system and subsystem design and evaluation activities. (48) (Cost Element 4.1) System Evaluation increases in FY 2027 to support the Strategic Weapons System wide systems engineering management across all of the subsystems with a focus on SRSA-2 activities, including: system integration with emphasis on subsystem interface maturity to assess each subsystem Interface Readiness Level, system verification and validation with emphasis on analysis methodologies, event planning, and procedure development, system interface development with emphasis on the SWS physical architecture model, preliminary evaluations of system and subsystem performance towards SRSA-2 and accuracy model coordination with subsystems, SRSA-2 progress assessment at KP-2 to verify the SWS preliminary design will be satisfactorily completed and validated through model-based environments. This will also include action item closure/close out of KP-2 as applicable. FY 2027 increases also support D5LE2 System Level Test and Evaluation (T&E). Increases include defining emulator architecture and planning for emulator interconnectivity, Hardware in the Loop (HWIL) Test Requirements and Test Case Development of Enhanced Grounds Tests (EGT). LI 1250 - TRIDENT II Mods Navy UNCLASSIFIED Page 42 of 42 P-1 Line #2 Volume 1 - 50 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 3: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1350 / Missile Industrial Facilities Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 83.537 8.133 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 83.537 8.133 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 83.537 8.133 0.000 0.000 0.000 0.000 0.000 0.000 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: In FY 2026 funding transfers from Line Item (LI) 1350 to LI 1250 to allow flexibility that would foster innovation and promote efficiency. PE/BLI consolidation is aligned to 'Objective 1: Strengthen and Simplify Strategy to Budget to Capability' as outlined in the DoW PPBE Reform Implementation Report from January 2025. Funding for Missile Industrial Facilities provides for capital maintenance projects at Navy-owned Naval Industrial Reserve Ordnance Plants (NIROPs) at Sunnyvale, California, Santa Cruz, California, and Bacchus, Utah in support of the Fleet Ballistic Missile program. The Sunnyvale facility consists of 49 acres of land and 10 buildings. The Santa Cruz facility consists of 271 acres of land and 29 buildings. The Bacchus facility consists of 583 acres and more than 130 buildings and more than 13 miles of roads. LI 1350 - Missile Industrial Facilities Navy UNCLASSIFIED Page 1 of 3 P-1 Line #3 Volume 1 - 51 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 01: Ballistic Missiles / BSA 3: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1350 / Missile Industrial Facilities Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Missile Industrial Facilities - / 83.537 - / 8.133 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 83.537 - / 8.133 - / 0.000 - / 0.000 - / 0.000 - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The NIROP buildings are vital to D5 motor production and must be maintained in an operational state until the D5 missile retirement. Most buildings are already more than 50 years old and have exceeded their useful life. Safety related maintenance projects were deferred when the Department of the Navy did not have a program of record to re-motor the D5 missile to support the missile's extended deployment. The Navy's decision to fund the re-motoring of D5 missiles means repairs and upgrades are necessary to ensure NIROP buildings are safe and properly maintained to support this significant extension of D5 motor procurements. Starting in FY 2026 funding transferred from Line Item (LI) 1350 to LI 1250 and continues through the outyears. LI 1350 - Missile Industrial Facilities Navy UNCLASSIFIED Page 2 of 3 P-1 Line #3 Volume 1 - 52 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Missile Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 1507N / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Missile Industrial Facilities MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 83.537 8.133 0.000 0.000 0.000 0.000 - - - - - - 83.537 8.133 0.000 0.000 0.000 0.000 - - - - - - 83.537 8.133 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Capital Maintenance (1) Subtotal: Recurring Cost - - 83.537 - - 8.133 - - - - - - - - - - - - - - 83.537 - - 8.133 - - - - - - - - - - - Subtotal: Hardware Cost - - 83.537 - - 8.133 - - - - - - - - - - - - Gross/Weapon System Cost - - 83.537 - - 8.133 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Footnotes: (1) In FY 2026 funding transfers from Line Item (LI) 1350 to LI 1250 to allow flexibility that would foster innovation and promote efficiency. PE/BLI consolidation meets the DoW Implementation Plan from the Commission on PPBE Interim Report. LI 1350 - Missile Industrial Facilities Navy UNCLASSIFIED Page 3 of 3 P-1 Line #3 Volume 1 - 53 === page 94 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 54 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 1: Strategic Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2101 / Tomahawk Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 289 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 8,959 20 - 58 - 58 557 551 526 577 577 11,825 15,326.820 95.940 1,015.106 2,165.160 2,198.222 2,190.458 2,505.205 1,941.692 27,445.796 15,326.820 15,326.820 7.193 - - 95.940 7.193 - - 95.940 7.193 1,015.106 - 0.000 - 1,015.106 - 0.000 1,015.106 - 1,015.106 0.000 1,015.106 2,165.160 2,165.160 2,198.222 2,198.222 To FY 2031 Complete 2,190.458 2,190.458 2,505.205 2,505.205 Total 1,941.692 27,445.796 1,941.692 27,445.796 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) 1,275.124 2,954.450 - - - - - 16,937.414 - - 16,937.414 - - 3,584.977 - 3,679.931 - 3,798.308 - 3,865.409 - 2,878.780 1,892.523 - - Description: The Block V TACTOM (Tactical Tomahawk) surface launched guided missile (RGM) and undersea guided missile (UGM) (TACTOM RGM/UGM-109E) preserves Tomahawk's long-range precision-strike capability while increasing responsiveness and flexibility. TACTOM is capable of in-flight retargeting, the ability to loiter over the battlefield, in-flight missile health and status monitoring, and battle damage indication. Other Tomahawk Weapon System functionality includes rapid mission planning and execution via Global Positioning System (GPS) onboard the launch platform and improved anti-jam GPS. RGM/UGM-109E Tactical Tomahawk provides an attack capability against fixed and mobile targets, and can launch from both surface ships (RGM) and submarines (UGM). FY 2026 spend plan includes $7,193 thousand of discretionary funding and $250,421 thousand of reconciliation funding for 55 new Block V VLS TACTOMs for a total of 55/$257,614 thousand. The discretionary funds provide for associated support costs. Reconciliation funds provide for: - 55 new Block V VLS TACTOMs for $136,863 thousand - 55 MK 14 canisters for $11,032 thousand - $44,574 thousand for Classified cost element - $1,508 thousand for Support Costs - $56,444 thousand for expansion of Defense Advanced Manufacturing techniques - Organic Warhead Production The FY 2027 request for Tomahawk Production includes $1,015,106 thousand of discretionary funding and $1,993,803 thousand of reconciliation funding for a total of $3,008,909 thousand. The FY 2027 budget request includes funding for 785 new AURs split across MYP Year 1 and 2: 205 new AURs awarded as an Option to MYP Year 1 and 580 new AURs on MYP Year 2. Characteristics and dimensions (approximate): Weight (with booster and capsule) (UGM-109): 4,300 pounds Weight (with booster and canister) (RGM-109): 4,300 pounds Length (with booster): 20.5 feet Wing Span: 8.6 feet Cruise Speed: High Subsonic LI 2101 - Tomahawk Navy UNCLASSIFIED Page 1 of 15 P-1 Line #4 Volume 1 - 55 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 1: Strategic Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2101 / Tomahawk Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 289 Exhibits Schedule Exhibit Type Title* P-5 1 / Tomahawk P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 8,959 / 15,326.820 20 / 95.940 - / 7.193 58 / 1,015.106 - / 0.000 58 / 1,015.106 8,959 / 15,326.820 20 / 95.940 - / 7.193 58 / 1,015.106 - / 0.000 58 / 1,015.106 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In 2026, the Tomahawk program entered a seven-year Multiyear Procurement (MYP), as authorized in Section 8010 (c) of the Consolidated Appropriations Act of 2026. The MYP strategy for Tomahawk expands the capacity of the Tomahawk production line from 600 All-Up-Rounds (AURs) per year to 1,068 AURs per year without additional government investment in capacity by leveraging savings to the contractor generated through economic order quantities of material from sub-vendors, enabled by the establishment of steady and consistent total order quantities from the government. Maintaining the total order quantities of Tomahawk AURs on the MYP consistently at 1,068 per year is critical to supporting the industrial base stability needed to achieve and sustain this increased production capacity. Total order quantities on the Tomahawk MYP are funded across multiple budgets and customers including the U.S. Navy, U.S. Army, and FMS cases, and are split as 718 new production AURs plus 350 Recertified AURs per year with 300 of the 1,068 AURs produced as a Maritime Strike Tomahawk (MST) variant. Due to the MYP commitment, any adjustment to order quantity by one customer must be offset by equal and opposite adjustment(s) by other customer(s) so that total quantities on the MYP remain consistent. The Tomahawk MYP Year 1 in 2026 was negotiated to include 912 total AURs, comprised of: .- 562 new production AURs . - 318 funded in FY 2026 (55 U.S. Navy, 5 U.S. Army, 258 FMS) . - 244 funded in FY 2027 mandatory (reconciliation) (205 U.S. Navy, 39 U.S. Army) . - U.S. Navy quantities requested on P-5 Cost Elements 1.1.5 and 2.1.5 . - U.S. Army quantities requested in the Missile Procurement, Army exhibit .- 350 recertified AURs . - 296 funded in FY 2026 (274 U.S. Navy, 22 FMS) . - 54 funded in FY 2027 mandatory (reconciliation) (U.S. Navy) . - Requested in the WPN-2301 Tomahawk Mods exhibit The 912 AURs included in MYP Year 1 will deliver in a 12-month period. 614 AURs funded with FY 2026 and FMS funding will deliver over the first 8 months, with the remaining 298 AURs requested in FY 2027 delivering in the final 4 months. The Munitions Acceleration Framework Agreement signed with RTX on January 27, 2026 established a quantity of 912 AURs for MYP Year 1 (FY 2026) due to capacity/ramp up constraints. The total quantity of 1,068 AURs per year begins with MYP Year 2 (FY 2027). The FY 2027 request for Tomahawk Production includes $1,015,106 thousand of discretionary funding and $1,993,803 thousand of reconciliation funding for a total of $3,008,909 thousand. The FY 2027 budget request includes funding for 785 new AURs split across MYP Year 1 and 2: 205 new AURs awarded as an Option to MYP Year 1 and 580 new AURs on MYP Year 2. The FY 2027 budget request for the 1,068 AURs to be awarded under MYP Year 2 is scheduled to deliver within a 12-month period following the MYP Year 1 delivery period and is comprised as follows: - 580 Navy new production - 138 Army new production - 350 Navy recertifications LI 2101 - Tomahawk Navy UNCLASSIFIED Page 2 of 15 P-1 Line #4 Volume 1 - 56 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 1: Strategic Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2101 / Tomahawk Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 289 Quantities by variant provided below. Discretionary funds provide for: - 26 new Block V VLS TACTOMs for $66,057 thousand - 20 new Block V CLS TACTOMs for $50,813 thousand - 12 new Block Va VLS TACTOMs for $72,022 thousand - 38 MK 14 canisters for $7,782 thousand - 20 MK 45 canisters for $18,092 thousand - $793,478 thousand for Classified cost element - $6,862 thousand for support costs Reconciliations funds provide for: - 522 new Block V VLS TACTOMs for $1,326,229 thousand - 205 new Block V VLS TACTOMs for $510,124 thousand under MYP Year 1 Option - 522 MK 14 canisters for $106,902 thousand - 205 MK 14 canisters for $41,119 thousand under MYP Year 1 Option - $9,429 thousand for support costs FY 2027 funds Diminishing Manufacturing Sources and Material Shortages (DMSMS) and parts obsolescence issues. FY 2025 matches the Base for Reprogramming Actions, DD 1414 and includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). In FY 2025, DON received $63.263 million for the procurement of 20 AURs for the replacement of Navy stock. This results in an increase in FY 2025 quantities from 0 to 20 new Block V VLS TACTOMs and MK 14 canisters. LI 2101 - Tomahawk Navy UNCLASSIFIED Page 3 of 15 P-1 Line #4 Volume 1 - 57 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Tomahawk MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 20 15,326.820 95.940 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 15,326.820 Plus CY Advance Procurement ($ in Millions) 15,326.820 FY 2027 Base - - 7.193 - - 95.940 7.193 FY 2027 OOC 58 7.193 95.940 - Total Obligation Authority ($ in Millions) FY 2026 8,959 FY 2027 Total - 1,015.106 58 0.000 - 1,015.106 - 1,015.106 - 0.000 - 1,015.106 - 1,015.106 - 0.000 1,015.106 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 1,710.774 - 4,797.000 - - - 17,501.828 - - 17,501.828 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 Total Cost Unit Cost 2,407.450 ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway - TOTAL HARDWARE - MISSILE Cost Recurring Cost 1.1.1) TACTICAL (†) 1,145.878 3,631 4,160.683 (†) 883.216 1,078 952.107 TOMAHAWK (VLS) (1) 1.1.2) TACTICAL TOMAHAWK (CLS) (2) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) (†) (3) 1.1.5) MYP YEAR 1 OPTION TACTICAL TOMAHAWK (VLS) (4) 1.1.6) TACTICAL TOMAHAWK (TTL) 1.1.7) REMANUFACTURE (BLOCK III) 1.1.8) TACTICAL TOMAHAWK CLASSIFIED (5) 1.1.9) PREVIOUS TOMAHAWK PRODUCTION LI 2101 - Tomahawk Navy 20 48.149 - - - 2,540.615 26 66.056 - - - 2,540.615 26 66.056 - - - - - - 2,540.668 20 50.813 - - - 2,540.668 20 50.813 6,001.833 12 72.022 - - - 6,001.833 12 72.022 - - - - - - - - - - - - - - - - - - - - 0.001 - - - - - 0.001 65 70.745 - - - - - - - - - - - - - - - - - 592.217 - - - - - - - - - - - - - - - - - 37.053 - - 10.940 - - - - - - - - - - 4,200 5,611.035 - - - - - - - - - - - - - 1,088.385 1,335.961 UNCLASSIFIED Page 4 of 15 793.478 - P-1 Line #4 793.478 - Volume 1 - 58 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Tomahawk MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 11,423.840 - - 59.089 - - - - - 982.370 - - - - - 982.370 Subtotal: Flyaway - TOTAL HARDWARE - MISSILE Cost - - 11,423.840 - - 59.089 - - - - - 982.370 - - - - - 982.370 Hardware - TOTAL HARDWARE - MISSILE - OTHER COSTS Cost Recurring Cost 2.1.1) CCLS CAPSULE RETRO KIT - - 26.300 - - - - - - - - - - - - - - - 352.786 1,078 380.303 - - - - - - - - - - - - - - - 90.788 3,631 329.652 20 3.929 - - - 204.763 38 7.781 - - - 204.763 38 7.781 (†) (7) - - - - - - - - - 904.600 20 18.092 - - - 904.600 20 18.092 2.1.5) MYP YEAR 1 OPTION MK 14 - - - - - - - - - - - 0.001 - - - - - 0.001 (9) - - 127.059 - - 11.553 - - 2.217 - - 0.500 - - - - - 0.500 Subtotal: Recurring Cost - - 863.314 - - 15.482 - - 2.217 - - 26.374 - - - - - 26.374 Subtotal: Hardware - TOTAL HARDWARE - MISSILE OTHER COSTS Cost - - 863.314 - - 15.482 - - 2.217 - - 26.374 - - - - - 26.374 - - 13.848 - - 14.913 - - - - - - - - - - - - 3.1.2) PRODUCTION LINE TRANSITION - - 20.162 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 34.010 - - 14.913 - - - - - - - - - - - - - - 34.010 - - 14.913 - - - - - - - - - - - - 2.1.2) CCLS SUBMARINE CAPSULES 2.1.3) MK 14 (†) (6) CANISTERS 2.1.4) MK 45 CANISTERS CANISTERS (8) 2.1.6) OBSOLESCENCE 196.450 Hardware - Hardware/Non-Recurring Cost Non Recurring Cost 3.1.1) NONRECURRING ENGINEERING - CLS RE-START (10) Subtotal: Hardware Hardware/Non-Recurring Cost Support - TOTAL PROCUREMENT SUPPORT - MISSILE Cost LI 2101 - Tomahawk Navy UNCLASSIFIED Page 5 of 15 P-1 Line #4 Volume 1 - 59 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Tomahawk MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost 4.1) PRODUCT IMPROVEMENT 4.2) PRODUCTION ENGINEERING SUPPORT (11) 4.3) SPECIAL TOOLING & TEST EQUIPMENT (ST & TE) 4.4) SYSTEMS ENGINEERING (12) Subtotal: Support TOTAL PROCUREMENT SUPPORT - MISSILE Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 444.331 - - - - - - - - - - - - - - - - - 809.731 - - 1.770 - - 1.426 - - 2.362 - - - - - 2.362 - - 38.090 - - - - - - - - - - - - - - - - - 446.135 - - 1.517 - - 1.205 - - 2.750 - - - - - 2.750 - - 1,738.287 - - 3.287 - - 2.631 - - 5.112 - - - - - 5.112 Support - TOTAL FLEET SUPPORT - MISSILE Cost 5.1) DOCUMENTATION - - 32.257 - - - - - - - - - - - - - - - - - 321.825 - - 3.169 - - 2.345 - - 1.250 - - - - - 1.250 5.3) THEATER MISSION PLANNING CENTER - - 255.044 - - - - - - - - - - - - - - - 5.4) TRAINING EQUIPMENT - - 87.953 - - - - - - - - - - - - - - - 5.5) Tomahawk Modernization - - 256.772 - - - - - - - - - - - - - - - 6.1) EOQ - - 50.000 - - - - - - - - - - - - - - - 6.2) EOQ Credit - - -50.000 - - - - - - - - - - - - - - - - - 953.851 - - 3.169 - - 2.345 - - 1.250 - - - - - 1.250 - - 313.518 - - - - - - - - - - - - - - - - - 313.518 - - - - - - - - - - - - - - - 8,959 15,326.820 20 95.940 - - 7.193 - - 0.000 5.2) SUPPORT EQUIPMENT (13) Subtotal: Support - TOTAL FLEET SUPPORT MISSILE Cost Support - TOTAL SPARES & REPAIR PARTS Cost 7.1) TOMAHAWK INITIAL SPARES Subtotal: Support - TOTAL SPARES & REPAIR PARTS Cost Gross/Weapon System Cost (†) 1,710.774 4,797.000 17,501.828 58 1,015.106 17,501.828 58 1,015.106 indicates the presence of a P-5a Footnotes: LI 2101 - Tomahawk Navy UNCLASSIFIED Page 6 of 15 P-1 Line #4 Volume 1 - 60 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 P-1 Line Item Number / Title: 2101 / Tomahawk ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Tomahawk MDAP/MAIS Code: (1) Cost Element 1.1.1 - TACTICAL TOMAHAWK (VLS): FY 2027 includes $66,057 thousand of discretionary funding for 26 new Block V VLS TACTOMs plus $1,326,229 thousand of reconciliation funding for 522 new Block V VLS TACTOMs, for a total of 548/$1,392,286 thousand. MYP Year 2 unit cost per Block V VLS TACTOM is $2,540.668 thousand. FY 2026 includes $0 discretionary funding for 0 new Block V VLS TACTOMs plus $136,863 of reconciliation funding for 55 new Block V VLS TACTOMs, for a total of 55/$136,863 thousand. MYP Year 1 unit cost per Block V VLS TACTOM is $2,488.420 thousand. $1 thousand of FY27 discretionary funds realigned to CE 1.1.5 to allow CE 1.1.5 to show MYP footnotes in budget exhibit. Actual FY27 discretionary funding is $66,057 thousand. To support MYP commitment the total procurement quantity is 718 per year. This quantity is budgeted for procurement under separate budget lines for the Navy (WPN 2101), Army (MPA 9214C18200), and approved FMS cases. (2) Cost Element 1.1.2 - TACTICAL TOMAHAWK (CLS): FY 2027 funding supports the procurement of 20 new Block V CLS TACTOMs. To support MYP commitment the total procurement quantity is 718 per year. This quantity is budgeted for procurement under separate budget lines for the Navy (WPN 2101), Army (MPA 9214C18200), and approved FMS cases. (3) Cost Element 1.1.3 - TACTICAL TOMAHAWK BLK Va (VLS): FY 2027 funding supports the procurement of 12 new Block Va TACTOMs. To support MYP commitment the total procurement quantity is 718 per year. This quantity is budgeted for procurement under separate budget lines for the Navy (WPN 2101), Army (MPA 9214C18200), and approved FMS cases. (4) Cost Element 1.1.5 - MYP YEAR 1 OPTION TACTICAL TOMAHAWK (VLS): FY 2027 includes $0 of discretionary funding for 0 new Block V VLS TACTOMs plus $510,124 thousand of reconciliation funding for 205 new Block V VLS TACTOMs, for a total of 205/$510,124 thousand. Requested FY 2027 funding supports the procurement of new Block V VLS TACTOMs for FY 2026 Option to MYP Year 1 Contract. MYP Year 1 unit cost per Block V VLS TACTOM is $2,488.420 thousand. $1 thousand of FY27 discretionary funds realigned from CE 1.1.1 to allow CE 1.1.5 to show MYP footnotes in budget exhibit. Actual FY27 discretionary funding is $0 thousand. To support MYP Year 1 commitment the total procurement quantity is 562 per year. This quantity is budgeted for procurement under separate budget lines for the Navy (WPN 2101), Army (MPA 9214C18200), and approved FMS cases. (5) Cost Element 1.1.8 - TACTICAL TOMAHAWK - CLASSIFIED: FY 2027 includes $793,478 thousand of discretionary funding plus $0 of reconciliation funding for a total of $793,478 thousand. FY 2026 includes $0 of discretionary funding plus $44,547 thousand of reconciliation funding for a total of $44,547 thousand. Details held at a higher classification. (6) Cost Element 2.1.3 - MK 14 CANISTERS: FY 2027 includes $7,782 thousand of discretionary funding for 38 canisters plus $106,902 thousand of reconciliation funding for 522 canisters for a total of 560/ $114,684 thousand. Unit cost per canister is $204.792 thousand. FY 2026 includes $0 of discretionary funding plus $11,032 thousand of reconciliation funding for 55 MK 14 canisters for a total of 55/$11,032 thousand. Unit cost per canister in FY2026 is $200.580 thousand. $1 thousand of FY27 discretionary funds realigned to CE 2.1.5 as allow CE 2.1.5 to show MYP footnotes in budget exhibit. Actual FY27 discretionary funding is $7,782 thousand. The MK 14s are independently contracted with delivery schedules to support the TACTOM AUR production contract. Delivery schedules for the MK 14s to the Government are designed to meet the GFE requirements the Government has in the TACTOM AUR production contract. MK 14 Canisters are awarded via a NAVSEA-administered contract that included canister procurement for multiple programs to achieve greater economies of scale. (7) Cost Element 2.1.4 - MK 45 CANISTERS: FY 2027 funding supports the procurement of 20 MK 45 canisters. Procurement of MK 45 canisters required to enable CLS production of Block V and Va Tactical Tomahawk AURs. The MK 45 are independently contracted with delivery schedules to support the TACTOM AUR production contract. Delivery schedules for the MK 45s to the Government are designed to meet the GFE requirements the Government has in the TACTOM AUR production contract. (8) Cost Element 2.1.5 - MYP YEAR 1 OPTION MK 14 CANISTERS: FY 2027 includes $0 of discretionary funding for 0 MK 14 Canisters and $41,119 thousand of reconciliation funding for 205 MK 14 canisters, for a total of 205/$41,119 thousand. Requested FY 2027 funding supports the procurement of MK 14 canisters for FY 2026 Option to MYP Year 1 Contract. Unit cost per canister is $200.580 thousand. $1 thousand of FY27 discretionary funds realigned from CE 2.1.3 as allow CE 2.1.5 to show MYP footnotes in budget exhibit. Actual FY27 discretionary funding is $0 thousand. (9) Cost Element 2.1.6 - OBSOLESCENCE: FY 2027 includes $500 thousand of discretionary funding plus $4,552 thousand of reconciliation funding for a total of $5,052 thousand. FY 2026 includes $2,217 thousand of discretionary funding plus $525 thousand of reconciliation funding for a total of $2,742 thousand. Funding is for Diminishing Manufacturing Sources, and Material Shortages (DMSMS), and part obsolescence redesign to enable the continued production of TACTOM BLK V AURs. The increase in funding from FY 2026 to FY 2027 is due to obsolescence costs are expected to increase in support of the rapid production capacity increase enabled by the Tomahawk Multi Year Procurement contract initiated in FY 2026. The funding reflects required production obsolescence mitigation including, but not limited to avionics, electrical, and structures bill of material development, and obsolescence ECP forecasting in order to support the extended end of service date. Efforts include identification of alternate materials, replacing obsolete parts with current technology in systems, weapons replaceable assemblies, their subassemblies, components and subcomponents, logistical analysis and support, engineering drawing updates, new manufacturing tooling and test equipment. (10) Cost Element 3.1.1 - NON-RECURRING ENGINEERING - CLS RE-START: FY 2025 funding supports completing Non-Recurring Engineering efforts required to re-start production of MK45 Capsules. The final lot of BLK IV CLS TACTOM production was procured in FY 2014. (11) Cost Element 4.2 - PRODUCTION ENGINEERING SUPPORT: FY 2027 includes $2,362 thousand of discretionary funding plus $550 thousand of reconciliation funding for a total of $2,912 thousand. FY 2026 includes $1,440 thousand of discretionary funding plus $260 thousand of reconciliation funding for a total of $1,700 thousand. The increase in funding from FY 2026 to FY 2027 is due to engineering support LI 2101 - Tomahawk Navy UNCLASSIFIED Page 7 of 15 P-1 Line #4 Volume 1 - 61 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 P-1 Line Item Number / Title: 2101 / Tomahawk ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Tomahawk MDAP/MAIS Code: costs are expected to increase in support of the rapid production capacity increase enabled by the Tomahawk Multi Year Procurement contract initiated in FY 2026. Production Engineering Support costs include warhead energetics, airframe engineering competencies, production acceptance testing, and integrated logistics support. (12) Cost Element 4.4 - SYSTEMS ENGINEERING: FY 2027 includes $2,750 thousand of discretionary funding plus $230 thousand of reconciliation funding for a total of $2,980 thousand. FY 2026 includes $1,205 thousand discretionary funding plus $253 thousand of reconciliation funding for a total of $1,458 thousand. The increase in funding from FY 2026 to FY 2027 is due to systems engineering costs are expected to increase in support of the rapid production capacity increase enabled by the Tomahawk Multi Year Procurement contract initiated in FY 2026. Systems Engineering costs include warhead energetics, airframe engineering competencies, production acceptance testing, and integrated logistics support. (13) Cost Element 5.2 - SUPPORT EQUIPMENT: FY 2027 includes $1,250 thousand of discretionary funding plus $4,097 thousand of reconciliation funding for a total of $5,347 thousand. FY 2026 includes $2,331 thousand of discretionary funding and $470 thousand of reconciliation funding for a total of $2,801 thousand. The increase in funding from FY 2026 to FY 2027 is due to support equipment costs are expected to increase in support of the rapid production capacity increase enabled by the Tomahawk Multi Year Procurement contract initiated in FY 2026. Funds the procurement of Mid-Body Range Safety System (MRSS) required to conduct TACTOM BLK IV/V flight testing, and associated test equipment obsolescence, and cyber security upgrades necessary for software development, MRSS Kit production, and TACTOM BLK IV/V missile conversion into a flight test missile. LI 2101 - Tomahawk Navy UNCLASSIFIED Page 8 of 15 P-1 Line #4 Volume 1 - 62 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 O O C Cost Elements 1.1.1) TACTICAL TOMAHAWK (VLS) (†) 1.1.1) TACTICAL TOMAHAWK (VLS) (†) 1.1.1) TACTICAL TOMAHAWK (VLS) (†) 1.1.1) TACTICAL TOMAHAWK (VLS) (†) 1.1.2) TACTICAL TOMAHAWK (CLS) (†) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) (†) (†) P-1 Line Item Number / Title: 2101 / Tomahawk Item Number / Title [DODIC]: 1 / Tomahawk FY Contractor and Location Method/Type or Funding Vehicle 2022 Raytheon Missile System / Tucson AZ SS / FPIF NAVAIR Mar 2022 Oct 2025 70 1,684.157 Y Oct 2021 2023 Raytheon Missile System / Tucson AZ SS / FPIF NAVAIR Nov 2022 Aug 2026 40 1,894.927 Y Dec 2020 2025 Raytheon Missile System / Tucson AZ SS / FPIF NAVAIR Dec 2025 Jun 2028 20 2,407.450 Y Mar 2023 SS / FPIF NAVAIR May 2027 Mar 2030 26 2,540.615 Y Dec 2025 Dec 2025 2027 Raytheon Technologies Corporation - MYP (14) / Tucson, AZ Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 2027 Raytheon Technologies Corporation - MYP / Tucson, AZ SS / FPIF NAVAIR May 2027 Jan 2031 20 2,540.668 Y 2027 Raytheon Technologies Corporation - MYP / Tucson, AZ SS / FPIF NAVAIR May 2027 Sep 2030 12 6,001.833 N 2.1.3) MK 14 CANISTERS (†) 2025 BAE / MINNEAPOLIS, MN C / FP NAVSEA Apr 2026 Aug 2027 20 196.450 Y 2.1.3) MK 14 CANISTERS (†) 2027 BAE / MINNEAPOLIS, MN C / FP NAVSEA Apr 2027 Aug 2028 38 204.763 Y 2.1.4) MK 45 CANISTERS (†) 2027 Raytheon Technologies Corporation - MYP / Tucson, AZ C / FP NAVSEA Mar 2027 Jul 2028 20 904.600 N RFP Issue Date Oct 2029 Feb 2027 indicates the presence of a P-21 Footnotes: (14) MSR of 90 for FY 2027 only applies for single vice Multi Year Procurement. Max of 1,068 represent full production across production and recertification in the Multi Year Procurement. LI 2101 - Tomahawk Navy UNCLASSIFIED Page 9 of 15 P-1 Line #4 Volume 1 - 63 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) TACTICAL TOMAHAWK (VLS) Item Number / Title [DODIC]: 1 / Tomahawk Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3521 (15) 0 70 A - - - - - - - - - - - - - - - - - - - 70 23 0 23 A - - - - - - - - - - - - - - - - - - - 23 (‡) 54 0 54 A - - - - - - - - - - - - - - - - - - - 54 2022 Total 147 0 147 - - - - - - - - - - - - - - - - - - - 147 1 2023 NAVY (16) 0 40 A - - - - - - - - - - - 40 1 2023 ARMY 50 0 50 A - - - - - - - - - - - 50 1 2023 MC (‡) 13 0 13 A - - - - - - - - - - - 13 1 2023 Total 103 0 103 - - - - - - - - - - - 103 1 2025 NAVY (17) 0 20 23 0 23 23 116 0 116 116 1 2022 NAVY 1 2022 ARMY 1 2022 MC 1 70 (‡) 40 (‡) 20 (‡) 20 1 2025 ARMY 1 2025 FMS 1 2025 MC (‡) 13 0 13 13 1 2025 Total 172 0 172 172 2 2027 NAVY 26 0 26 26 0 20 20 (‡) 1.1.2) TACTICAL TOMAHAWK (CLS) (2) Prior Years Deliveries: 1078 3 2027 NAVY 20 (18) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) 4 2027 NAVY 4 2027 ARMY 4 2027 Total (‡) 2.1.3) MK 14 CANISTERS (3) 12 0 12 12 138 0 138 138 150 0 150 150 (6) Prior Years Deliveries: 3631 5 2025 NAVY 20 0 20 20 5 2027 NAVY 38 0 38 38 20 0 20 2.1.4) MK 45 CANISTERS 6 2027 (7) NAVY 20 O C T LI 2101 - Tomahawk Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 64 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) TACTICAL TOMAHAWK (VLS) Item Number / Title [DODIC]: 1 / Tomahawk Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3521 (15) 0 70 - - - - - - - - - - - - - - - - - - - - - - - - 70 23 0 23 - - - - - - - - - - - - - - - - - - - - - - - - 23 (‡) 54 0 54 - - - - - - - - - - - - - - - - - - - - - - - - 54 2022 Total 147 0 147 - - - - - - - - - - - - - - - - - - - - - - - - 147 1 2023 NAVY (16) 0 40 - - - - - - - - - - - - - - - - - - - - - - - - 40 1 2023 ARMY 50 0 50 - - - - - - - - - - - - - - - - - - - - - - - - 50 1 2023 MC (‡) 13 0 13 - - - - - - - - - - - - - - - - - - - - - - - - 13 1 2023 Total 103 0 103 - - - - - - - - - - - - - - - - - - - - - - - - 103 1 2025 NAVY (17) 0 20 23 0 23 23 116 0 116 116 1 2022 NAVY 1 2022 ARMY 1 2022 MC 1 70 (‡) 40 (‡) 20 (‡) 20 1 2025 ARMY 1 2025 FMS 1 2025 MC (‡) 13 0 13 13 1 2025 Total 172 0 172 172 2 2027 NAVY 26 0 26 26 0 20 20 (‡) 1.1.2) TACTICAL TOMAHAWK (CLS) (2) Prior Years Deliveries: 1078 3 2027 NAVY 20 (18) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) 4 2027 NAVY 4 2027 ARMY 4 2027 Total (‡) 2.1.3) MK 14 CANISTERS (3) 12 0 12 12 138 0 138 138 150 0 150 150 (6) Prior Years Deliveries: 3631 5 2025 NAVY 20 0 20 20 5 2027 NAVY 38 0 38 38 20 0 20 2.1.4) MK 45 CANISTERS 6 2027 (7) NAVY 20 O C T LI 2101 - Tomahawk Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 65 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) TACTICAL TOMAHAWK (VLS) Item Number / Title [DODIC]: 1 / Tomahawk Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3521 (15) 0 70 10 18 14 19 - - - 0 23 0 23 - - - - - - - - 2 21 0 (‡) 54 0 54 - - - - - 2 16 15 21 - 2022 Total 147 0 147 10 18 14 21 16 15 23 21 - - - - - 1 2023 NAVY (16) 0 40 - - - - - - - - - - - - - 23 17 0 1 2023 ARMY 50 0 50 - - - - - - - - - - 25 25 - - - 0 1 2023 MC (‡) 13 0 13 - - - - - - - - - - - 10 3 - - 1 2023 Total 103 0 103 - - - - - - - - - - 25 35 3 23 17 - - - - - - - - - 0 1 2025 NAVY (17) 0 20 A - - - - - - - - - - - - - - - - - - - - - - 20 1 2025 ARMY 1 2025 FMS 1 2025 MC 1 2025 2 2027 NAVY 26 1 2022 NAVY 1 2022 ARMY 1 2022 MC 1 70 (‡) 40 (‡) 20 (‡) 3 3 6 6 - 0 - - - - - - - - - 0 0 23 0 23 A - - - - - - - - - - - - - - - - - - - - - - 23 116 0 116 A - - - - - - - - - - - - - - - - - - - - - - 116 (‡) 13 0 13 A - - - - - - - - - - - - - - - - - - - - - - 13 Total 172 0 172 - - - - - - - - - - - - - - - - - - - - - - 172 0 26 A - - - - - 26 0 20 A - - - - - 20 (‡) 1.1.2) TACTICAL TOMAHAWK (CLS) (2) Prior Years Deliveries: 1078 3 2027 NAVY 20 (18) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) 4 2027 NAVY 4 2027 ARMY 4 2027 Total (‡) 2.1.3) MK 14 CANISTERS (3) 12 0 12 A - - - - - 12 138 0 138 A - - - - - 138 150 0 150 - - - - - 150 - - - - A - - - - (6) Prior Years Deliveries: 3631 5 2025 NAVY 20 0 20 5 2027 NAVY 38 0 38 20 0 20 2.1.4) MK 45 CANISTERS 6 2027 A - - - - - - - - - - - - 2 2 - 16 - 38 - 20 (7) NAVY A O C T LI 2101 - Tomahawk Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 66 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) TACTICAL TOMAHAWK (VLS) Item Number / Title [DODIC]: 1 / Tomahawk Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3521 (15) 70 0 0 23 23 0 0 (‡) 54 54 0 2022 Total 147 147 0 1 2023 NAVY (16) 40 0 0 1 2023 ARMY 50 50 0 0 1 2023 MC (‡) 13 13 0 1 2023 Total 103 103 0 - - - - - - - - - - - - - - 1 2025 NAVY (17) 0 20 - - - - - - - - - - - - - 11 1 2025 ARMY 23 0 23 - - - - - - - - - - - - 9 14 1 2025 FMS (‡) 116 0 116 - - - - - - - - 25 25 25 25 16 - 1 2025 MC (‡) 13 0 13 - - - - - - - - - - - - - - 1 12 1 2025 Total 172 0 172 - - - - - - - - 25 25 25 25 25 25 10 12 - - - - - - - - 0 2 2027 NAVY 26 0 26 - - - - - - - - - - - - - - - - - - - - - - - - 26 0 20 - - - - - - - - - - - - - - - - - - - - - - - - 20 1 2022 NAVY 1 2022 ARMY 1 2022 MC 1 70 (‡) 40 (‡) 20 (‡) 1.1.2) TACTICAL TOMAHAWK (CLS) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - 9 - - - - - - - - 0 - 0 - - 0 - - 0 0 (2) Prior Years Deliveries: 1078 3 2027 NAVY 20 (18) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) 4 2027 NAVY 4 2027 ARMY 4 2027 Total (‡) 2.1.3) MK 14 CANISTERS (3) 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 138 0 138 - - - - - - - - - - - - - - - - - - - - - - - - 138 150 0 150 - - - - - - - - - - - - - - - - - - - - - - - - 150 - - (6) Prior Years Deliveries: 3631 5 2025 NAVY 20 4 16 5 2027 NAVY 38 0 38 20 0 20 2.1.4) MK 45 CANISTERS 6 2027 2 2 - 2 - 2 - 2 - 2 - 2 - 2 - 0 - 4 4 3 3 3 3 3 3 3 3 3 3 0 (7) NAVY O C T LI 2101 - Tomahawk Navy N O V D E C J A N F E B M A R A P R M A Y J U N 4 J U L 4 A U G UNCLASSIFIED Page 13 of 15 4 S E P 4 O C T 4 N O V 0 D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 67 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) TACTICAL TOMAHAWK (VLS) Item Number / Title [DODIC]: 1 / Tomahawk Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3521 (15) 70 0 0 23 23 0 0 (‡) 54 54 0 2022 Total 147 147 0 1 2023 NAVY (16) 40 0 0 1 2023 ARMY 50 50 0 0 1 2023 MC (‡) 13 13 0 1 2023 Total 103 103 0 1 2025 NAVY (17) 20 0 0 1 2025 ARMY 23 23 0 0 1 2025 FMS (‡) 116 116 0 0 1 2025 MC (‡) 13 13 0 1 2025 Total 172 172 0 - - - - - - 2 2027 NAVY 26 0 26 - - - - - 26 0 20 - - - - - - - - - - - 1 2022 NAVY 1 2022 ARMY 1 2022 MC 1 70 (‡) 40 (‡) 20 (‡) 1.1.2) TACTICAL TOMAHAWK (CLS) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - 0 0 (2) Prior Years Deliveries: 1078 3 2027 NAVY 20 (18) 1.1.3) TACTICAL TOMAHAWK BLK Va (VLS) 4 2027 NAVY 4 2027 ARMY 4 2027 Total (‡) 2.1.3) MK 14 CANISTERS - - - - 20 0 (3) 12 0 12 - - - - - - - - - - - 12 - - - - - - - - - - - 138 0 138 - - - - - - - - - - - - 12 13 12 12 13 12 13 13 12 13 13 150 0 150 - - - - - - - - - - - 12 12 13 12 12 13 12 13 13 12 13 13 0 0 - 0 (6) Prior Years Deliveries: 3631 5 2025 NAVY 20 20 0 0 5 2027 NAVY 38 38 0 0 20 20 0 2.1.4) MK 45 CANISTERS 6 2027 (7) NAVY 0 O C T LI 2101 - Tomahawk Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 68 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2101 / Tomahawk Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 1 Item Number / Title [DODIC]: 1 / Tomahawk Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 90 250 600 0 0 0 0 0 3 27 30 90 356 1,068 0 0 34 34 0 0 34 34 3 Raytheon Technologies Corporation - MYP - Tucson, AZ 20 20 20 0 0 0 0 0 0 34 34 4 Raytheon Technologies Corporation - MYP - Tucson, AZ 90 250 300 0 0 0 0 0 0 40 40 5 BAE - MINNEAPOLIS, MN 90 250 718 0 0 0 0 0 0 16 16 6 Raytheon Technologies Corporation - MYP - Tucson, AZ 20 20 20 0 0 0 0 0 6 16 22 1 Raytheon Missile System Tucson AZ 2 Raytheon Technologies Corporation - MYP Tucson, AZ (14) - (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (14) (15) MSR of 90 for FY 2027 only applies for single vice Multi Year Procurement. Max of 1,068 represent full production across production and recertification in the Multi Year Procurement. Army delivery of 8 VLS TACTOMs shown in May 2026 actually occured in August 2023. Delivery was part of agreement between Navy and Army to provide missiles already under contract. PDOCS does not allow delivery schedule longer than 24 months from first delivery. (16) The Department added FY 2021 funds for 8 VLS TACTOMs to the FY 2023 FRP19 contract as a replacement-in-kind from a UK FMS case. PDOCS does not allow delivery schedule longer than 24 months from first delivery. An additional 8 missiles are slated for delivery in 10/2026, funded with the FR 2021 replacement-in-kind. (17) (18) FY 2025 Army QTYs include BLK V and Maritime Strike Tomahawk (BLK Va) variants. FY 2025 USMC QTYs are Maritime Strike Tomahawk (BLK Va) variants. Max rate of 20 in FY 2027 for CLS Production is due to the production line re-start of MK45 Capsules starting in FY 2027. LI 2101 - Tomahawk Navy UNCLASSIFIED Page 15 of 15 P-1 Line #4 Volume 1 - 69 === page 110 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 70 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 185 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 3,974 155 41 106 - 106 480 480 480 480 - 6,196 4,126.871 207.093 69.913 167.439 167.439 772.776 800.917 821.665 844.568 - 7,811.242 4,126.871 4,126.871 207.093 207.093 69.913 69.913 - 0.000 - 167.439 - - 0.000 167.439 - 167.439 - 0.000 167.439 772.776 772.776 800.917 800.917 821.665 821.665 To FY 2031 Complete 844.568 844.568 Total - 7,811.242 - 7,811.242 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) 990.955 - 17.866 1.543 1.686 - 1.686 1,320.781 1,646.293 1,556.415 - 1,556.415 - - - - - 1,604.733 - 1,663.267 - 1,706.379 - 1,753.979 - - 21.095 - 1,227.383 - - Description: The Advanced Medium Range Air-to-Air Missile (AMRAAM) is a joint Air Force/Navy, Acquisition Category 1C program with Air Force as lead service. AMRAAM is the premier all-weather, all-environment, radar-guided missile with improved capabilities against very low and high-altitude targets in an electronic attack environment. The current AMRAAM AIM-120D variant delivers improved performance via Global Positioning System (GPS) aided navigation, two-way datalink capability for enhanced aircrew survivability and improved network compatibility, and incorporates new guidance software that improves kinematic performance and weapon effectiveness. The FY 2027 request for AURs includes $167,439 thousand of discretionary and $636,846 thousand of mandatory (reconciliation) for a total of $840,285 thousand. FY 2027 total funding supports the procurement of 494 AMRAAM missiles. The discretionary funds provide for 106 AMRAAM missiles. The mandatory funds provide for 388 AMRAAM missiles. Differences in USN and USAF All Up Round (AUR) Unit Cost is the result of the variations in procurement of missile types by each service. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 1 of 12 P-1 Line #5 Volume 1 - 71 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 185 Exhibits Schedule Exhibit Type Title* P-5 1 / AMRAAM P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 3,974 / 4,126.871 155 / 207.093 41 / 69.913 106 / 167.439 - / 0.000 106 / 167.439 3,974 / 4,126.871 155 / 207.093 41 / 69.913 106 / 167.439 - / 0.000 106 / 167.439 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding procures 494 AMRAAM missiles in support of warfighter requirements. Funding is also provided for test and technical production support, procurement of training equipment and test equipment upgrades to support the AMRAAM configurations. Additionally, funding is used to resolve production Diminishing Manufacturing Sources and Material Shortages, obsolescence issues, studies, bridge buys, life of type buys, supplier/parts replacement and qualification activities to preserve future production capabilities and capacities. The FY27 budget request includes MYP in support of AMRAAM. This MYP strategy generates efficiencies that result in greater production capacity, accelerated delivery, and lower unit costs. The MYP contracting and financing strategy leverages saving generated through economic order quantities of material from sub-vendors, enabled by the establishment of steady and consistent total order quantities. Maintaining the total order quantities is critical to supporting the industrial base stability needed to achieve and sustain production capacity. Total order quantities of AMRAAM are funded across multiple budgets and customers including the U.S. Navy, U.S. Air Force, and FMS cases. Missile configurations may vary based on warfighter needs, which include assets used for training and Weapon System Evaluation Program (WSEP). Due to AMRAAM inventories being critically low, the program will procure the maximum quantity of missiles with the provided funding in accordance with Title 10, US Code Section 2308 BUY-TO-BUDGET ACQUISITION. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 2 of 12 P-1 Line #5 Volume 1 - 72 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / AMRAAM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 41 106 4,126.871 207.093 69.913 167.439 - - 4,126.871 Plus CY Advance Procurement ($ in Millions) - 207.093 - Total Obligation Authority ($ in Millions) FY 2027 OOC 155 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 3,974 - 4,126.871 - 0.000 - 69.913 167.439 - 167.439 - 207.093 106 0.000 - 69.913 FY 2027 Total - 167.439 - 167.439 0.000 167.439 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 1,038.468 17.866 1.543 1.686 - 1.686 1,336.084 1,705.195 1,579.613 - 1,579.613 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 Total Cost Unit Cost 1,133.000 ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway - MISSILE Cost Recurring Cost 1.1.1) AIM-120 MISSILE - ALL-UP- (†) (1) ROUND (AUR) 1.1.2) AIM-120 MISSILE - CAPTIVE AIR TRAINING MISSILE (CATM) 745.059 3,520 2,622.606 155 175.615 583.249 485 282.876 - - - 1,451.634 41 59.517 1,356.887 106 - - - - - 143.830 - - - 1,356.887 106 143.830 - - - - - - - 1.1.3) WARRANTY - - 36.120 - - - - - - - - - - - - - - - 1.1.4) DIMINISHING MANUFACTURING - - 369.567 - - 20.551 - - 2.943 - - 14.750 - - - - - 14.750 - - 61.536 - - 3.033 - - 1.807 - - - - - - - - - - - 36.019 - - - - - 0.303 - - - - - - - - - Subtotal: Recurring Cost - - 3,408.724 - - 199.199 - - 64.570 - - 158.580 - - - - - 158.580 Subtotal: Flyaway - MISSILE Cost - - 3,408.724 - - 199.199 - - 64.570 - - 158.580 - - - - - 158.580 - - - - - - - - - - - - SOURCES (DMS) (2) 1.1.5) TOOLING AND TEST EQUIPMENT 1.1.7) ENGINEERING CHANGE ORDERS (ECO) (3) Flyaway - NONRECURRING and ANCILLARY EQUIPMENT Cost Non Recurring Cost 2.1.1) SPECIAL TOOLING AND TEST EQUIPMENT LI 2206 - AMRAAM Navy - - 93.514 - UNCLASSIFIED Page 3 of 12 - P-1 Line #5 - Volume 1 - 73 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / AMRAAM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.1.2) CONTAINERS Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 9.256 - - 2.500 - - - - - 3.438 - - - - - 3.438 Subtotal: Non Recurring Cost - - 102.770 - - 2.500 - - - - - 3.438 - - - - - 3.438 Subtotal: Flyaway NONRECURRING and ANCILLARY EQUIPMENT Cost - - 102.770 - - 2.500 - - - - - 3.438 - - - - - 3.438 (4) Flyaway - PRODUCTION SUPPORT Cost Recurring Cost 3.1.1) TEST SUPPORT - - 140.828 - - 0.825 - - 0.884 - - 0.906 - - - - - 0.906 3.1.2) TECHNICAL SUPPORT - - 285.733 - - 2.197 - - 2.044 - - 2.056 - - - - - 2.056 Subtotal: Recurring Cost - - 426.561 - - 3.022 - - 2.928 - - 2.962 - - - - - 2.962 Subtotal: Flyaway PRODUCTION SUPPORT Cost - - 426.561 - - 3.022 - - 2.928 - - 2.962 - - - - - 2.962 - - 60.880 - - - - - - - - - - - - - - - - - 44.233 - - 2.109 - - 2.147 - - 2.186 - - - - - 2.186 4.3) INTEGRATED LOGISTICS SUPPORT (ILS) - - 83.703 - - 0.263 - - 0.268 - - 0.273 - - - - - 0.273 Subtotal: Support SUPPORT COST - FLEET Cost - - 188.816 - - 2.372 - - 2.415 - - 2.459 - - - - - 2.459 3,974 4,126.871 155 207.093 41 69.913 106 167.439 - - 0.000 106 167.439 Support - SUPPORT COST - FLEET Cost 4.1) PECULIAR SUPPORT EQUIPMENT 4.2) TRAINING EQUIPMENT (5) Gross/Weapon System Cost (†) 1,038.468 1,336.084 1,705.195 1,579.613 1,579.613 indicates the presence of a P-5a Footnotes: (1) Differences in USN and USAF All Up Round (AUR) Unit Cost is the result of the variations in procurement of missile types by each service. FY 2027 unit cost is projected to decrease due to overall increase of total customer buying power across all services and customers. Total missiles in FY 2026 are 1,187 (AF: 403, USN: 41, FMS: 743) and FY27 are 1,900 (AF: 636, USN: 494, FMS: 770) The FY 2027 request for AURs includes $143,830 thousand of discretionary and $636,846 thousand of mandatory (reconciliation) for a total of $780,676 thousand. FY 2027 total funding supports the procurement of 494 AMRAAM missiles. The discretionary funds provide for 106 AMRAAM missiles. The mandatory funds provide for 388 AMRAAM missiles. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 4 of 12 P-1 Line #5 Volume 1 - 74 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2206 / AMRAAM ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / AMRAAM MDAP/MAIS Code: (2) DMS funding supports the resolution of Diminishing Manufacturing Sources and Material Shortages, including obsolescence issues, required studies, bridge buys, life of type procurements, supplier and parts replacement, and qualification activities necessary to preserve future production capability and capacity. These requirements tapered off in FY 2026 because Navy procurements were previously planned to end in FY 2027. However, with the requirement to procure additional AURs in FY 2027 and later now continued, DMS efforts are required to sustain the industrial base and ensure component availability for future production. As a result, FY 2027 DMS requirements increase significantly from FY 2026 (back to FY 2025 and prior levels) to sustain the continued production of missiles. (3) Engineering Change Orders cost element provides funding to test and qualify class I engineering change proposals by the prime vendor into missile production. Fluctuations correspond directly with total cost of hardware procured. (4) Containers are normally procured every other year as required to maintain pace with quantities, but with the increase of missiles being procured additional containers are being procured to ensure in-container reprogramming capability is maintained and replace outdated/damaged containers. (5) Training Equipment request includes funding for the AMRAAM Telemetry System (ATS) to replenish the stock of ATS kits the warfighter expends during AMRAAM live-fire missile training exercises and is based upon the projected number of ATS missile shots planned each year. The ATS enables the warfighter to measure the effectiveness of missile improvements while also becoming more proficient on the missile employment and tactics necessary to fully utilize missile capabilities. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 5 of 12 P-1 Line #5 Volume 1 - 75 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) 1.1.1) AIM-120 MISSILE - ALL-UPROUND (AUR) (†) (†) O O C FY 2022 2023 2024 2025 2026 2027 Contractor and Location Raytheon Missile System (6) / Tucson, AZ Raytheon Missile System (6) / Tucson, AZ Raytheon Missile System (6) / Tucson, AZ Raytheon Missile System (6) / Tucson, AZ Raytheon Missile System (6) / Tucson, AZ Raytheon Missile System (6) / Tucson, AZ P-1 Line Item Number / Title: 2206 / AMRAAM Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / AMRAAM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) SS / FPIF EGLIN AFB, FL Aug 2022 Mar 2025 85 873.694 Y Sep 2018 SS / FPIF EGLIN AFB, FL Jun 2023 Nov 2026 305 1,054.452 Y Sep 2021 SS / FPIF EGLIN AFB, FL Sep 2024 Feb 2027 331 1,093.943 Y Sep 2021 SS / FPIF EGLIN AFB, FL Jul 2025 Jul 2028 155 1,133.000 Y Jul 2024 SS / FPIF EGLIN AFB, FL May 2026 Jul 2029 41 1,451.634 Y Jul 2024 SS / FPIF EGLIN AFB, FL Nov 2027 Jul 2030 106 1,356.887 Y Jul 2024 Qty (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (6) AIM-120 MSR is 400 missiles per year, consisting of USN, USAF, and approved FMS procurement with no less than 100 of a particular variant. FY 2027 max factory capacity enables production of 1,900 missiles per year. Due to Service specific guidance, differences exist between USAF and DoN Initial and Reorder Procurement Lead Time within each Service's budget exhibits. Within the USAF (lead service) P-21 exhibit, the Initial Procurement Leadtime data is based on contract data for the budget year, while the Reorder Procurement Leadtime data is left blank. Within this DoN P-21 exhibit, Initial Procurement Leadtime data is based on first DoN missile procurement in FY 1989, while the Reorder Procurement Leadtime data is based on contract data for the budget year. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 6 of 12 P-1 Line #5 Volume 1 - 76 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AMRAAM Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 1.1.1) AIM-120 MISSILE - ALL-UP-ROUND (AUR) Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N Calendar Year 2023 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 2799 1 2022 NAVY 85 0 85 A - - - - - - - - - - - - - - 85 1 2022 AF (‡) 317 0 317 A - - - - - - - - - - - - - - 317 1 2022 FMS 547 0 547 A - - - - - - - - - - - - - - 547 1 2022 Total 949 0 949 - - - - - - - - - - - - - - 949 1 2023 NAVY 305 0 305 A - - - - 305 1 2023 (‡) 278 0 278 A - - - - 278 AF (‡) (‡) 1 2023 FMS 364 0 364 A - - - - 364 1 2023 Total 947 0 947 - - - - 947 1 2024 NAVY 331 0 331 331 1 2024 AF (‡) 457 0 457 457 1 2024 FMS 350 0 350 350 1 2024 Total 1,138 0 1,138 1,138 1 2025 NAVY 155 0 155 155 1 2025 AF (‡) 290 0 290 290 1 2025 FMS 350 0 350 350 1 2025 Total 795 0 795 795 1 2026 NAVY 41 0 41 41 1 2026 AF (‡) 403 0 403 403 1 2026 FMS 743 0 743 743 1 2026 Total 1,187 0 1,187 1,187 1 2027 NAVY 106 (7) 0 106 106 1 2027 AF 636 0 636 636 1 2027 FMS 770 0 770 770 1 2027 Total 1,512 0 1,512 1,512 (‡) (‡) (‡) (‡) (‡) O C T LI 2206 - AMRAAM Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 77 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AMRAAM Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 1.1.1) AIM-120 MISSILE - ALL-UP-ROUND (AUR) Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 2799 1 2022 NAVY 85 0 85 - - - - - - - - - - - - - - - - - 21 - - 21 - - 21 22 1 2022 (‡) 317 0 317 - - - - - - - - - - - - - - - - - 79 - - 79 - - 79 80 AF (‡) 1 2022 FMS 547 0 547 - - - - - - - - - - - - - - - - - 136 - - 136 - - 137 138 1 2022 Total 949 0 949 - - - - - - - - - - - - - - - - - 236 - - 236 - - 237 240 1 2023 NAVY 305 0 305 - - - - - - - - - - - - - - - - - - - - - - - - 305 1 2023 (‡) 278 0 278 - - - - - - - - - - - - - - - - - - - - - - - - 278 AF (‡) 1 2023 FMS 364 0 364 - - - - - - - - - - - - - - - - - - - - - - - - 364 1 2023 Total 947 0 947 - - - - - - - - - - - - - - - - - - - - - - - - 947 1 2024 NAVY 331 0 331 A - - - - - - - - - - - - - 331 1 2024 AF (‡) 457 0 457 A - - - - - - - - - - - - - 457 1 2024 FMS 350 0 350 A - - - - - - - - - - - - - 350 1 2024 Total 1,138 0 1,138 - - - - - - - - - - - - - 1,138 1 2025 NAVY 155 0 155 A - - - 155 1 2025 AF (‡) 290 0 290 A - - - 290 1 2025 FMS 350 0 350 A - - - 350 1 2025 Total 795 0 795 - - - 795 1 2026 NAVY 41 0 41 41 1 2026 AF (‡) 403 0 403 403 1 2026 FMS 743 0 743 743 1 2026 Total 1,187 0 1,187 1,187 1 2027 NAVY 106 (7) 0 106 106 1 2027 AF 636 0 636 636 1 2027 FMS 770 0 770 770 1 2027 Total 1,512 0 1,512 1,512 (‡) (‡) (‡) (‡) (‡) O C T LI 2206 - AMRAAM Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 78 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AMRAAM Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.1) AIM-120 MISSILE - ALL-UP-ROUND (AUR) Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 2799 1 2022 NAVY 85 63 22 - - 22 0 1 2022 (‡) 317 237 80 - - 80 0 AF (‡) 1 2022 FMS 547 409 138 - - 138 1 2022 Total 949 709 240 - - 240 - - - - - - - - - - - - - - - - - - - - 1 2023 NAVY 305 0 305 - - - - - - - - - - - - - 76 - - 76 - - 76 - - 77 0 1 2023 (‡) 278 0 278 - - - - - - - - - - - - - 70 - - 69 - - 70 - - 69 0 AF (‡) 0 - 0 1 2023 FMS 364 0 364 - - - - - - - - - - - - - 91 - - 91 - - 91 - - 91 1 2023 Total 947 0 947 - - - - - - - - - - - - - 237 - - 236 - - 237 - - 237 - 0 1 2024 NAVY 331 0 331 - - - - - - - - - - - - - - - - 82 - - 83 - - 83 - 83 1 2024 AF (‡) 457 0 457 - - - - - - - - - - - - - - - - 114 - - 114 - - 114 - 115 1 2024 FMS 350 0 350 - - - - - - - - - - - - - - - - 88 - - 87 - - 87 - 88 1 2024 Total 1,138 0 1,138 - - - - - - - - - - - - - - - - 284 - - 284 - - 284 - 286 1 2025 NAVY 155 0 155 - - - - - - - - - - - - - - - - - - - - - - - - 155 1 2025 AF (‡) 290 0 290 - - - - - - - - - - - - - - - - - - - - - - - - 290 1 2025 FMS 350 0 350 - - - - - - - - - - - - - - - - - - - - - - - - 350 1 2025 Total 795 0 795 - - - - - - - - - - - - - - - - - - - - - - - - 795 1 2026 NAVY 41 0 41 A - - - - - - - - - - - - - - - - - 41 1 2026 AF (‡) 403 0 403 A - - - - - - - - - - - - - - - - - 403 1 2026 FMS 743 0 743 A - - - - - - - - - - - - - - - - - 743 1 2026 Total 1,187 0 1,187 - - - - - - - - - - - - - - - - - 1,187 1 2027 NAVY 106 (7) 0 106 106 1 2027 AF 636 0 636 636 1 2027 FMS 770 0 770 770 1 2027 Total 1,512 0 1,512 1,512 (‡) (‡) (‡) (‡) (‡) O C T LI 2206 - AMRAAM Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G 0 S E P Volume 1 - 79 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AMRAAM Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 1.1.1) AIM-120 MISSILE - ALL-UP-ROUND (AUR) Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 2799 1 2022 NAVY 85 85 0 0 1 2022 (‡) 317 317 0 0 AF (‡) 1 2022 FMS 547 547 0 1 2022 Total 949 949 0 1 2023 NAVY 305 305 0 0 1 2023 (‡) 278 278 0 0 AF (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2023 FMS 364 364 0 1 2023 Total 947 947 0 - - 1 2024 NAVY 331 248 83 - 83 0 1 2024 AF (‡) 457 342 115 - 115 0 1 2024 FMS 350 262 88 - 88 1 2024 Total 1,138 852 286 - 286 - - - - - - - - - - - - - - - - - 1 2025 NAVY 155 0 155 - - - - - - - - - 38 - - 38 - - 39 - - 40 0 1 2025 AF (‡) 290 0 290 - - - - - - - - - 72 - - 72 - - 73 - - 73 0 1 2025 FMS 350 0 350 - - - - - - - - - 88 - - 87 - - 87 - - 88 1 2025 Total 795 0 795 - - - - - - - - - 198 - - 197 - - 199 - - 201 - - - - - 0 1 2026 NAVY 41 0 41 - - - - - - - - - - - - - - - - - - - - - 10 - - 31 1 2026 AF (‡) 403 0 403 - - - - - - - - - - - - - - - - - - - - - 100 - - 303 1 2026 FMS 743 0 743 - - - - - - - - - - - - - - - - - - - - - 185 - - 558 1 2026 Total 1,187 0 1,187 - - - - - - - - - - - - - - - - - - - - - 295 - - 892 1 2027 NAVY 106 (7) 0 106 A - - - - - - - - - - - - - - - - - - - - - - - 106 1 2027 AF 636 0 636 A - - - - - - - - - - - - - - - - - - - - - - - 636 1 2027 FMS 770 0 770 A - - - - - - - - - - - - - - - - - - - - - - - 770 1 2027 Total 1,512 0 1,512 - - - - - - - - - - - - - - - - - - - - - - - 1,512 (‡) (‡) (‡) (‡) (‡) 0 O C T LI 2206 - AMRAAM Navy N O V - - - - - - - - - - - - - - - - - - - - - - 0 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R - - - - - 0 0 M A Y J U N J U L A U G S E P Volume 1 - 80 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AMRAAM Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT 1.1.1) AIM-120 MISSILE - ALL-UP-ROUND (AUR) Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 2799 1 2022 NAVY 85 85 0 0 1 2022 (‡) 317 317 0 0 AF (‡) 1 2022 FMS 547 547 0 1 2022 Total 949 949 0 1 2023 NAVY 305 305 0 0 1 2023 (‡) 278 278 0 0 AF (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2023 FMS 364 364 0 1 2023 Total 947 947 0 1 2024 NAVY 331 331 0 0 1 2024 AF (‡) 457 457 0 0 1 2024 FMS 350 350 0 1 2024 Total 1,138 1,138 0 1 2025 NAVY 155 155 0 0 1 2025 AF (‡) 290 290 0 0 1 2025 FMS 350 350 0 1 2025 Total 795 795 0 - - - - - - - 1 2026 NAVY 41 10 31 10 - - 10 - - 11 0 1 2026 AF (‡) 403 100 303 101 - - 101 - - 101 0 1 2026 FMS 743 185 558 186 - - 186 - - 186 1 2026 Total 1,187 295 892 297 - - 297 - - 298 - - - - - - - - - - - - 1 2027 NAVY 106 (7) 0 106 - - - - - - - - - 26 - - 27 - - 26 - - 27 0 1 2027 AF 636 0 636 - - - - - - - - - 159 - - 159 - - 159 - - 159 0 1 2027 FMS 770 0 770 - - - - - - - - - 192 - - 193 - - 192 - - 193 1 2027 Total 1,512 0 1,512 - - - - - - - - - 377 - - 379 - - 377 - - 379 (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T LI 2206 - AMRAAM Navy - N O V D E C J A N F E B M A R A P R - - - - - - - - - - - - - - - - - 0 0 M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R - - - - - 0 0 M A Y J U N J U L A U G S E P Volume 1 - 81 0 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2206 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / AMRAAM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Raytheon Missile System (6) Tucson, AZ MSR For 2027 1-8-5 For 2027 MAX For 2027 400 400 1,900 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 3 21 Total After Oct 1 ALT Prior to Oct 1 24 14 ALT After Oct 1 Manufacturing PLT 6 Total After Oct 1 24 30 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (6) AIM-120 MSR is 400 missiles per year, consisting of USN, USAF, and approved FMS procurement with no less than 100 of a particular variant. FY 2027 max factory capacity enables production of 1,900 missiles per year. Due to Service specific guidance, differences exist between USAF and DoN Initial and Reorder Procurement Lead Time within each Service's budget exhibits. Within the USAF (lead service) P-21 exhibit, the Initial Procurement Leadtime data is based on contract data for the budget year, while the Reorder Procurement Leadtime data is left blank. Within this DoN P-21 exhibit, Initial Procurement Leadtime data is based on first DoN missile procurement in FY 1989, while the Reorder Procurement Leadtime data is based on contract data for the budget year. (7) Production Quantity Maximum for the USN is 480. Due to quantity limitations for other services, the USN can procure up to 494 AURs in FY27 to meet max production capacity of 1900. LI 2206 - AMRAAM Navy UNCLASSIFIED Page 12 of 12 P-1 Line #5 Volume 1 - 82 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204162N, 0204138M Other Related Program Elements: 0207161N, 0207161F, 0604319A Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 4,080 608 146 306 - 306 320 358 380 385 774 7,357 1,785.807 295.280 84.713 174.750 174.750 185.837 203.559 217.543 222.995 473.633 3,644.117 1,785.807 1,785.807 295.280 295.280 84.713 84.713 - 0.000 - 174.750 - - 0.000 174.750 - 174.750 - 0.000 174.750 185.837 185.837 203.559 203.559 217.543 217.543 To FY 2031 Complete 222.995 473.633 222.995 Total 3,644.117 473.633 3,644.117 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) 393,793.38 - 1.577 2.324 2.116 - 2.116 2.002 2.261 2.487 451,692.43 383,171.23 466,611.11 - 466,611.11 475,393.75 485,667.60 493,794.74 - - - - - - - - 4.194 Continuing 503,748.05 - Continuing 467,396.64 428,078.97 - - Description: The AIM-9X Block II Sidewinder (AIM-9X Blk II) continues the evolution of the AIM-9 series of missiles. This missile program delivers a launch and leave, air combat munition that uses passive Infrared (IR) energy to acquire and track enemy air targets and complements the radar guided Advanced Medium Range Air-to-Air Missile (AMRAAM). This inner-boundary missile provides fighter aircrew with the first shot, first kill opportunities while conducting air combat maneuvering which is essential for aircrew survival. The AIM-9X delivers these opportunities with unmatched offensive and defensive capabilities against threats within the inner-boundary, even when IR countermeasures are employed. The AIM-9X also supports air superiority in the Beyond Visual Range air-to-air battle. Anti-tamper features have been incorporated to protect improvements inherent in this design. The AIM-9X Block II missile provides the Joint Force with fighter aircraft lethality and survivability necessary to counter threats identified in the Chief of Naval Operations Guidance and the National Defense Strategy. AIM-9X is a Post Milestone C, Acquisition Category IC joint service program led by the Department of the Navy (DoN). In June 2011, the Milestone Decision Authority established the AIM-9X Block II missile program which was approved for entry at Milestone C for Low Rate Initial Production. The Block I program ended with section 2366 A/B certification and Acquisition Program Baseline (APB) for AIM-9X Block II approval on December 23, 2011. In August 2015, the program received approval for Full Rate Production, and the APB was re-established. In February 2019, the AIM-9X Block II Sidewinder APB for DoN and United States Air Force (USAF) was revised to increase total missile procurements from 6,000 to 11,635 missiles and to extend missile procurements. Production currently ends in 2040. The current APB quantity of 11,635 missiles is made up of 5,326 DoN missiles and 6,309 USAF missiles. In addition to the 5,326 Block II missiles in the APB, this budget includes 1,289 Block I missiles and an additional 723 missiles for replacement of Navy stock expended in support of Ukraine and Israel, for a total of 7,338 missiles. FY 2026 funding for AIM-9X Sidewinder Block II includes $84,713 thousand discretionary funding and $50,000 thousand of mandatory (reconciliation) for a total of $134,713 thousand. The discretionary funding provides for the procurement and associated support of 127 AIM-9X Block II missiles and 85 retrofit Guidance Units. The mandatory funds provide for the development of second sources for rocket motors and other high-risk components, including government testing and the acquisition of tooling, equipment, and facilities necessary to establish and sustain production of those components. This investment creates a more resilient and flexible manufacturing base to ensure uninterrupted production. By dual sourcing these critical components, the program will reduce lead times, improving military readiness by getting AIM-9X missiles to the warfighter faster. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 1 of 22 P-1 Line #6 Volume 1 - 83 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204162N, 0204138M Other Related Program Elements: 0207161N, 0207161F, 0604319A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / SIDEWINDER BLOCK II P-3a 1 / Inertial Measurement Unit (IMU) Obsolescence upgrade (Reliability) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Title* P-5 1 / SIDEWINDER BLOCK II P-3a 1 / Inertial Measurement Unit (IMU) Obsolescence upgrade (Reliability) P-40 Total Gross/Weapon System Cost FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 4,080 / 1,758.152 608 / 289.665 127 / 71.277 306 / 158.435 - Exhibits Schedule Exhibit Type Prior Years Subexhibits ID CD MDAP/ MAIS Code / 16.315 - / 0.000 146 / 84.713 306 / 174.750 - / 0.000 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 17.739 320 / 185.837 / 5.615 - - / / 13.395 358 / 203.559 / 13.436 - - 306 / 158.435 608 / 295.280 - - / 0.000 4,080 / 1,785.807 P-5a, P-21 / 27.655 - / - - / 13.280 380 / 217.543 - / / 12.097 385 / 222.995 - - / / 40.570 774 / 473.633 / 16.315 306 / 174.750 - / / 160.102 7,357 / 3,644.117 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget provides funding to procure the 13th lot of FRP AIM-9X Block II (Blk II) missiles. Additionally, FY 2027 continues procurement of upgraded Inertial Measurement Unit Guidance Units. FY 2026 quantities of 127 are properly displayed on the P-5. The total quantity decrease from 146 to 127 between PB26 and PB27 is directly related to the exhibit P-3A increase in guidance unit quantities in FY26 between PB26 and PB27. An increased number of missile failures caused by reliability degrade and increased operational tempo necessitated an increased quantity of modifications needed. The program unit costs are based on quantities procured by the DoN, USAF, Army, Foreign Military Sales, and other customers. Total Program quantity by service includes a mix of All Up Round (AUR) missiles and Captive Air Training Missiles (CATMs). Due to AIM-9X inventories being below the USN Total Munitions Requirement, the program will procure the maximum quantity of missiles with the provided funding in accordance with Title 10, US Code Section 2308 BUY-TO-BUDGET ACQUISITION. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 2 of 22 P-1 Line #6 Volume 1 - 84 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 127 306 1,758.152 289.665 71.277 158.435 - - 1,758.152 Plus CY Advance Procurement ($ in Millions) - 289.665 - Total Obligation Authority ($ in Millions) FY 2027 OOC 608 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 4,080 - 1,758.152 - 0.000 - 71.277 158.435 - 158.435 - 289.665 306 0.000 - 71.277 FY 2027 Total - 158.435 - 158.435 - 0.000 158.435 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) - 430,919.61 - 476,422.70 - 561,236.22 - 517,761.44 - - 517,761.44 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Flyaway - MISSILE Cost Recurring Cost 1.1.1) All Up Round (†) (1) 390,707.65 1,830 714.995 464,750.31 112 52.052 478,897.56 96 45.974 474,050.21 277 131.312 - - 0.000 474,050.21 277 131.312 1.1.2) Captive Air Training Missile - 222,202.34 598 132.877 242,376.41 44 10.665 245,280.55 31 7.604 245,691.36 29 7.125 - - 0.000 245,691.36 29 7.125 473,955.56 270 127.968 459,407.08 452 207.652 - - 0.000 - - 0.000 - - 0.000 - - 0.000 251,000.00 1 0.251 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 445,456.52 92 40.982 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.038 - - 1.715 - - 1.602 - - 2.850 - - 0.000 - - 2.850 - - 1.204 - - 0.157 - - 0.160 - - 0.163 - - 0.000 - - 0.163 - - 0.681 - - 0.066 - - 0.050 - - 0.051 - - 0.000 - - 0.051 Block II Block II (†) (2) 1.1.3) All Up Round Block II - Presidential Drawdown (†) (3) 1.1.4) Captive Air Training Missile Block II - Presidential Drawdown (†) 1.1.5) All Up Round Block II Plus (†) 1.1.6) Engineering Change Orders - Block II (4) 1.1.7) Diminishing Manufacturing Sources (DMS) (5) 1.1.8) Government Cost (GFE & Testing) - Block II LI 2209 - Sidewinder Navy UNCLASSIFIED Page 3 of 22 P-1 Line #6 Volume 1 - 85 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 1,020.996 - - 272.307 - - 55.390 - - 141.501 - - 0.000 - - 141.501 Subtotal: Flyaway - MISSILE Cost - - 1,020.996 - - 272.307 - - 55.390 - - 141.501 - - 0.000 - - 141.501 1,289 364.058 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 364.058 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 364.058 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 13.679 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 33 0.553 78 1.282 - - 0.000 78 1.282 Flyaway - Prior Year Sidewinder Block 1 Cost Recurring Cost 2.1.1) Prior Year Sidewinder Block 1 282,434.45 Subtotal: Recurring Cost Subtotal: Flyaway - Prior Year Sidewinder Block 1 Cost Flyaway - Nonrecurring and Ancillary Equip Cost Non Recurring Cost 3.1.1) Special Tool & Test Equip (ST/STE) - Block II - 3.1.2) Missile Containers - Block II 12,917.62 789 10.192 15,854.87 26 0.412 3.1.3) Missile Containers - Block II - Presidential 15,647.89 71 1.111 15,528.46 123 1.910 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 196.641 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 221.623 - - 2.322 - - 0.553 - - 1.282 - - 0.000 - - 1.282 Subtotal: Flyaway Nonrecurring and Ancillary Equip Cost - - 221.623 - - 2.322 - - 0.553 - - 1.282 - - 0.000 - - 1.282 - - 33.590 - - 5.898 - - 6.021 - - 6.146 - - 0.000 - - 6.146 - - 33.590 - - 5.898 - - 6.021 - - 6.146 - - 0.000 - - 6.146 - - 1.788 - - 0.099 - - 0.102 - - 0.104 - - 0.000 - - 0.104 (6) Drawdown 16,748.07 16,434.84 16,434.84 (7) 3.1.4) Nonrecurring Engineering - Block II (8) Support - Production Support Cost 4.1) Production Technical Support - Block II (9) Subtotal: Support Production Support Cost Support - Support Costs Cost 5.1) Peculiar Support Equipment - Block II (10) LI 2209 - Sidewinder Navy UNCLASSIFIED Page 4 of 22 P-1 Line #6 Volume 1 - 86 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) 5.2) Training Support Block II (11) 5.3) Training Equipment - Block II 5.4) Contract Support Block II (12) 5.5) Government InHouse Support - Block II (13) Subtotal: Support - Support Costs Cost Gross/Weapon System Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.767 - - 0.163 - - 0.168 - - 0.171 - - 0.000 - - 0.171 - - 18.046 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 10.208 - - 0.850 - - 0.868 - - 0.886 - - 0.000 - - 0.886 - - 87.076 - - 8.026 - - 8.175 - - 8.345 - - 0.000 - - 8.345 - - 117.885 - - 9.138 - - 9.313 - - 9.506 - - 0.000 - - 9.506 4,080 1,758.152 608 289.665 127 71.277 306 158.435 - - 0.000 306 158.435 430,919.61 476,422.70 561,236.22 517,761.44 517,761.44 Remarks: [Flyaway] (†) indicates the presence of a P-5a Footnotes: (1) AUR Block II - (A) This budget exhibit represents only the US Navy portion of the total program procurement. This exhibit reflects a Navy unit cost that is congruent with the Air Force unit cost. Unit cost changes are heavily driven by total program quantity changes from year to year. The majority of parts are common between All Up Rounds (AURs) and Captive Air Training Missiles (CATMs). As a result, the overall quantities procured (between AURs and CATMs) to include all customers (Navy, Air Force, Army, Foreign Military Sales, and other customers) drive the unit cost. (B) FY 2025 AUR unit cost represents a composite unit cost based on procurements on Lot 25 ($0.458 million unit cost) and Lot 26 ($0.479 million estimated unit cost) combined. A quantity of 37 AURs will be procured with FY 2025 funding on LOT 26 in May 2026 due to Continuing Resolution Production Rate restrictions during negotiations for Lot 25 in FY 2025. (C) FY 2026 AUR unit cost is based on updated cost model projections that include actual data from the June 2025 Lot 25 contract award. FY 2026 AUR unit cost has increased due to various subsystem parts increases among the guidance unit and power subsystem. Additionally, FY 2026 AUR quantities have been revised from 110 to 96 to account for increased Guidance Unit (GU) replacement requirements. The increase in GU procurements reflects current projections indicating that GU failures will exceed the number of retrofit-capable units currently available. The increased GU procurements will reduce the turn-around-time for repairs and enhance AIM-9X readiness. (2) CATMs - (A) This budget exhibit represents only the US Navy portion of the total program procurement. This exhibit reflects a Navy unit cost that is congruent with the Air Force unit cost. Unit cost changes are heavily driven by total program quantity changes from year to year. The majority of parts are common between AURs and CATMs. As a result, the overall quantities procured (between AURs and CATMs) to include all customers (Navy, Air Force, Army, Foreign Military Sales, and other customers) drive the unit cost. FY 2025 CATM unit cost represents a composite unit cost based on procurements on Lot 25 ($0.242 million unit cost) and Lot 26 ($0.246 million estimated unit cost) combined. A quantity of four CATMs will be procured with FY 2025 funding on LOT 26 in May 2026 due to Continuing Resolution Production Rate restrictions during negotiations for Lot 25 in FY 2025. FY 2026 CATM quantities adjusted from 36 to 31 to account for increased Guidance Unit replacement requirements. CATM unit cost has been updated based on actual contracted costs for Lot 25. (3) FY 2025 Presidential Drawdown All Up Rounds are funded by the Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) and Ukraine Security Supplemental Appropriations Act, 2024 (Division B of Public Law 118-50) for the replacement of Navy stock. FY 2025 AUR unit cost represents a composite unit cost based on procurements on Lot 25 ($0.458 million unit cost) and Lot 26 ($0.479 million estimated unit cost) combined. A quantity of 35 AURs will be procured with FY 2025 funding on LOT 26 in March 2026. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 5 of 22 P-1 Line #6 Volume 1 - 87 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2209 / Sidewinder ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II MDAP/MAIS Code: (4) The Engineering Change Orders line provides funding to test and qualify engineering changes into missile production. ECO is calculated as a percentage of AUR Blk II and CATM missiles. The cost increase in FY2027 is driven by the significant increase in missile procurements. (5) DMS costs are estimated based on projected annual DMS issues. This cost element provides funding to procure Life of Type Buys, as well as design, develop, test and qualify form/fit/function replacement components to the production missile as a result of changes in sub-vendor manufacturers. (6) Containers are procured to ship missiles and are budgeted 1 container for every 4 missiles of each configuration, for each service separately (USN and USMC). Containers procured with baseline funding reflect a composite unit cost from Lot 25 and Lot 26 production contracts combined. FY 2026 container quantity and cost updated to align with AUR and CATM quantity updates. (7) These FY 2025 Presidential Drawdown containers are funded by the Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) and Ukraine Security Supplemental Appropriations Act, 2024 (Division B of Public Law 118-50) for the replacement of Navy stock. Containers procured with PD funding reflect a composite unit cost from Lot 25 and Lot 26 production contracts combined. (8) FY 2026 NRE funding includes $0 discretionary funding and $50,000 thousand of mandatory (reconciliation) for a total of $50,000 thousand. FY 2026 mandatory funds provide for the development of second sources for rocket motors and other high-risk components, including government testing and the acquisition of tooling, equipment, and facilities necessary to establish and sustain production of those components. This investment creates a more resilient and flexible manufacturing base to ensure uninterrupted production. By dual sourcing these critical components, the program will reduce lead times, improving military readiness by getting AIM-9X missiles to the warfighter faster. (9) The Production Tech Support line includes funding to manage technical documentation, training development and delivery, production support, cyber security, and management of government owned property to support production of AIM-9X configurations. (10) (11) (12) (13) The Peculiar Support Equipment line provides for calibration and procurement of government furnished gauges and equipment used to support missile production. The Training Support line provides technical publications and training manuals to fleet maintainers as well as Warfighter School support. Contract Support funding provides for program office support. The Government In-House Support line provides US Government Systems Engineering and Project Management support at Naval Air Warfare Centers for the production of the AIM-9X missile to ensure compliance with joint service developed cost, schedule and performance requirements. FY 2027 Government In-House Support is specifically required for the FRP 13 production lot procurement. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 6 of 22 P-1 Line #6 Volume 1 - 88 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.1) All Up Round - Block II (†) 1.1.2) Captive Air Training Missile (†) Block II 1.1.2) Captive Air Training Missile (†) Block II 1.1.2) Captive Air Training Missile (†) Block II 1.1.2) Captive Air Training Missile (†) Block II 1.1.2) Captive Air Training Missile (†) Block II 1.1.2) Captive Air Training Missile (†) Block II FY 2021 2022 2023 2024 2025 2026 2027 2022 2023 2024 2025 2026 2027 Contractor and Location Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile Systems (14) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ Raytheon Missile System (15) / Tucson, AZ P-1 Line Item Number / Title: 2209 / Sidewinder Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) SS / FPIF NAVAIR Jun 2021 Aug 2023 220 377,959.09 Y Jan 2020 SS / FPIF NAVAIR Mar 2022 Aug 2024 94 341,553.19 Y Jan 2020 SS / FPIF NAVAIR Jun 2023 Aug 2025 85 410,188.24 Y Jan 2020 SS / FPIF NAVAIR Sep 2024 Aug 2026 75 473,953.62 Y Jan 2023 SS / FPIF NAVAIR Jun 2025 Aug 2027 112 464,750.31 Y Jan 2023 SS / FPIF NAVAIR May 2026 Aug 2028 96 478,897.56 Y Jan 2023 SS / FPIF NAVAIR Jun 2027 Aug 2029 277 474,050.21 Y Jun 2026 SS / FPIF NAVAIR Mar 2022 Aug 2024 38 271,710.53 Y Jan 2020 SS / FPIF NAVAIR Jun 2023 Aug 2025 39 245,000.00 Y Jan 2020 SS / FPIF NAVAIR Sep 2024 Aug 2026 41 251,122.00 Y Jan 2023 SS / FPIF NAVAIR Jun 2025 Aug 2027 44 242,376.41 Y Jan 2023 SS / FPIF NAVAIR May 2026 Aug 2028 31 245,280.55 Y Jan 2023 SS / FPIF NAVAIR Jun 2027 Aug 2029 29 245,691.36 Y Jun 2026 Qty (Each) RFP Issue Date 1.1.3) All Up Round - Block II Presidential Drawdown 2024 Raytheon Missile Systems / Tuscon, AZ SS / FPIF NAVAIR Sep 2024 Aug 2026 270 473,955.56 Y Jan 2023 1.1.3) All Up Round - Block II Presidential Drawdown 2025 Raytheon Missile Systems / Tuscon, AZ SS / FPIF NAVAIR Jun 2025 Aug 2027 452 459,407.08 Y Jan 2024 1.1.4) Captive Air Training Missile Block II - Presidential Drawdown 2024 Raytheon Missile Systems / Tuscon, AZ SS / FPIF NAVAIR Sep 2024 Aug 2026 1 251,122.00 Y Jan 2023 SS / FPIF NAVAIR Jun 2021 Nov 2024 8 423,625.00 Y Jan 2020 1.1.5) All Up Round - Block II Plus LI 2209 - Sidewinder Navy 2021 Raytheon Missile Systems (16) / Tucson, AZ UNCLASSIFIED Page 7 of 22 P-1 Line #6 Volume 1 - 89 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements 1.1.5) All Up Round - Block II Plus (†) O O C FY 2022 Contractor and Location Raytheon Missile Systems (16) / Tucson, AZ P-1 Line Item Number / Title: 2209 / Sidewinder Method/Type or Funding Vehicle SS / FPIF Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Location of PCO Award Date Date of First Delivery NAVAIR Mar 2022 Mar 2025 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 6 435,000.00 Y RFP Issue Date Jan 2021 indicates the presence of a P-21 Footnotes: (14) (15) (16) AUR BLK II CATM AUR BLK II Plus - In December 2017, the program began to procure a third variant of the missile labeled the AIM-9X Block II PLUS (Block II+) to satisfy the requirements of the Joint Strike Fighter platform. This version of the missile was produced on the same production line as the AIM-9X Block II missile. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 8 of 22 P-1 Line #6 Volume 1 - 90 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) All Up Round - Block II PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1356 1 2021 NAVY 220 0 220 A - - - - - - - - - - - - - - - - 220 1 2021 (‡) 206 0 206 A - - - - - - - - - - - - - - - - 206 AF (‡) 1 2021 FMS 1 2021 Total 1 2022 NAVY 1 2022 ARMY 1 2022 AF 1 2022 FMS 1 2022 1 84 0 84 A - - - - - - - - - - - - - - - - 84 510 0 510 - - - - - - - - - - - - - - - - 510 94 0 94 A - - - - - - - 94 116 0 116 A - - - - - - - 116 140 0 140 A - - - - - - - 140 157 0 157 A - - - - - - - 157 Total 507 0 507 - - - - - - - 507 2023 NAVY 85 0 85 85 1 2023 AF (‡) 448 0 448 448 1 2023 FMS 341 0 341 341 1 2023 Total 874 0 874 874 1 2024 NAVY 75 0 75 75 1 2024 ARMY 15 0 15 15 1 2024 AF (‡) 256 0 256 256 1 2024 FMS 592 0 592 592 1 2024 Total 938 0 938 938 1 2025 NAVY 112 0 112 112 1 2025 ARMY 129 0 129 129 1 2025 (‡) 558 0 558 558 AF (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 1 2025 FMS 1 2025 Total 1 2026 NAVY 1 2026 ARMY 1 2026 AF (‡) 1 2026 FMS 1 2026 Total 808 0 808 808 1,607 0 1,607 1,607 96 0 96 96 76 0 76 76 144 0 144 144 634 0 634 634 950 0 950 (‡) (‡) 950 O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 91 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 ARMY 1 2027 AF 1 2027 FMS 1 2027 Total PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 277 0 277 277 476 0 476 476 791 0 791 791 358 0 358 358 1,902 0 1,902 1,902 (‡) (‡) (‡) 1.1.2) Captive Air Training Missile - Block II (2) Prior Years Deliveries: 480 2 2022 NAVY 38 0 38 A - - - - - - - 2 2022 AF (‡) 72 0 72 A - - - - - - - 72 2 2022 Total 110 0 110 - - - - - - - 110 2 2023 NAVY 39 0 39 39 2 2023 AF (‡) 97 0 97 97 2 2023 FMS 84 0 84 84 2 2023 Total 220 0 220 220 2 2024 NAVY 41 0 41 41 2 2024 ARMY 1 0 1 1 2 2024 AF 55 0 55 55 2 2024 FMS 68 0 68 68 2 2024 Total 165 0 165 165 2 2025 NAVY 44 0 44 44 2 2025 AF (‡) 58 0 58 58 2 2025 FMS 93 0 93 93 2 2025 Total 195 0 195 195 2 2026 NAVY 31 0 31 31 2 2026 AF (‡) 24 0 24 24 2 2026 FMS 150 0 150 150 2 2026 Total 205 0 205 205 2 2027 NAVY 29 0 29 29 2 2027 AF (‡) 18 0 18 18 2 2027 Total 47 0 47 (‡) (‡) (‡) (‡) (‡) (‡) 47 O C T LI 2209 - Sidewinder Navy 38 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 92 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) All Up Round - Block II PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1356 1 2021 NAVY 220 0 220 - - - - - - - - - - 19 19 19 19 18 18 18 18 18 18 18 18 0 1 2021 (‡) 206 0 206 - - - - - - - - - - 18 18 17 17 17 17 17 17 17 17 17 17 0 AF (‡) 1 2021 FMS 84 0 84 - - - - - - - - - - 7 7 7 7 7 7 7 7 7 7 7 7 1 2021 Total 510 0 510 - - - - - - - - - - 44 44 43 43 42 42 42 42 42 42 42 42 1 2022 NAVY 94 0 94 - - - - - - - - - - - - - - - - - - - - - - 8 8 78 1 2022 ARMY 116 0 116 - - - - - - - - - - - - - - - - - - - - - - 10 10 96 1 2022 AF (‡) 140 0 140 - - - - - - - - - - - - - - - - - - - - - - 12 12 116 1 2022 FMS 157 0 157 - - - - - - - - - - - - - - - - - - - - - - 14 13 130 1 2022 Total 507 0 507 - - - - - - - - - - - - - - - - - - - - - - 44 43 420 1 2023 NAVY 85 0 85 A - - - - - - - - - - - - - - - - 85 1 2023 AF (‡) 448 0 448 A - - - - - - - - - - - - - - - - 448 1 2023 FMS 341 0 341 A - - - - - - - - - - - - - - - - 341 1 2023 Total 874 0 874 - - - - - - - - - - - - - - - - 874 1 2024 NAVY 75 0 75 A - 75 1 2024 ARMY 15 0 15 A - 15 1 2024 AF (‡) 256 0 256 A - 256 1 2024 FMS 592 0 592 A - 592 1 2024 Total 938 0 938 - 938 1 2025 NAVY 112 0 112 112 1 2025 ARMY 129 0 129 129 1 2025 (‡) 558 0 558 558 AF (‡) (‡) (‡) (‡) (‡) (‡) (‡) 1 2025 FMS 1 2025 Total 1 2026 NAVY 1 2026 ARMY 1 2026 AF (‡) 1 2026 FMS 1 2026 Total 0 - - 0 808 0 808 808 1,607 0 1,607 1,607 96 0 96 96 76 0 76 76 144 0 144 144 634 0 634 634 950 0 950 (‡) (‡) 950 O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 93 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 ARMY 1 2027 AF 1 2027 FMS 1 2027 Total PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 277 0 277 277 476 0 476 476 791 0 791 791 358 0 358 358 1,902 0 1,902 1,902 (‡) (‡) (‡) 1.1.2) Captive Air Training Missile - Block II (2) Prior Years Deliveries: 480 2 2022 NAVY 38 0 38 - - - - - - - - - - - - - - - - - - - - - - 4 4 30 2 2022 AF (‡) 72 0 72 - - - - - - - - - - - - - - - - - - - - - - 6 6 60 2 2022 Total 110 0 110 - - - - - - - - - - - - - - - - - - - - - - 10 10 90 2 2023 NAVY 39 0 39 A - - - - - - - - - - - - - - - - 39 2 2023 AF (‡) 97 0 97 A - - - - - - - - - - - - - - - - 97 2 2023 FMS 84 0 84 A - - - - - - - - - - - - - - - - 84 2 2023 Total 220 0 220 - - - - - - - - - - - - - - - - 220 2 2024 NAVY 41 0 41 A - 41 2 2024 ARMY 1 0 1 A - 1 2 2024 AF 55 0 55 A - 55 2 2024 FMS 68 0 68 A - 68 2 2024 Total 165 0 165 - 165 2 2025 NAVY 44 0 44 44 2 2025 AF (‡) 58 0 58 58 2 2025 FMS 93 0 93 93 2 2025 Total 195 0 195 195 2 2026 NAVY 31 0 31 31 2 2026 AF (‡) 24 0 24 24 2 2026 FMS 150 0 150 150 2 2026 Total 205 0 205 205 2 2027 NAVY 29 0 29 29 2 2027 AF (‡) 18 0 18 18 2 2027 Total 47 0 47 (‡) (‡) (‡) (‡) (‡) (‡) 47 O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 94 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) All Up Round - Block II PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1356 1 2021 NAVY 220 220 0 0 1 2021 (‡) 206 206 0 0 AF (‡) 1 2021 FMS 84 84 0 1 2021 Total 510 510 0 1 2022 NAVY 94 16 78 8 8 8 8 8 8 8 8 7 7 0 1 2022 ARMY 116 20 96 10 10 10 10 10 10 9 9 9 9 0 1 2022 AF (‡) 140 24 116 12 12 12 12 12 12 11 11 11 11 0 1 2022 FMS 157 27 130 13 13 13 13 13 13 13 13 13 13 1 2022 Total 507 87 420 43 43 43 43 43 43 41 41 40 40 1 2023 NAVY 85 0 85 - - - - - - - - - - 8 7 7 7 7 7 7 7 7 7 7 7 0 1 2023 (‡) 448 0 448 - - - - - - - - - - 38 38 38 38 37 37 37 37 37 37 37 37 0 AF (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2023 FMS 341 0 341 - - - - - - - - - - 29 29 29 29 29 28 28 28 28 28 28 28 1 2023 Total 874 0 874 - - - - - - - - - - 75 74 74 74 73 72 72 72 72 72 72 72 1 2024 NAVY 75 0 75 - - - - - - - - - - - - - - - - - - - - - - 1 2024 ARMY 1 2024 AF (‡) 1 2024 FMS 1 2024 Total 1 2025 NAVY 1 2025 ARMY 1 2025 (‡) AF (‡) (‡) (‡) 1 2025 FMS 1 2025 Total 1 2026 NAVY 1 2026 ARMY 1 2026 AF (‡) 1 2026 FMS 1 2026 Total 0 0 - 1 (‡) - - 0 0 - 7 0 7 61 15 0 15 - - - - - - - - - - - - - - - - - - - - - - 2 2 11 256 0 256 - - - - - - - - - - - - - - - - - - - - - - 22 22 212 592 0 592 - - - - - - - - - - - - - - - - - - - - - - 50 50 492 938 0 938 - - - - - - - - - - - - - - - - - - - - - - 81 81 776 112 0 112 A - - - - - - - - - - - - - - - - 112 129 0 129 A - - - - - - - - - - - - - - - - 129 558 0 558 A - - - - - - - - - - - - - - - - 558 808 0 808 A - - - - - - - - - - - - - - - - 808 1,607 0 1,607 - - - - - - - - - - - - - - - - 1,607 96 0 96 A - - - - - 96 76 0 76 A - - - - - 76 144 0 144 A - - - - - 144 634 0 634 A - - - - - 634 950 0 950 - - - - - 950 (‡) (‡) O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 95 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 ARMY 1 2027 AF 1 2027 FMS 1 2027 Total PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 277 0 277 277 476 0 476 476 791 0 791 791 358 0 358 358 1,902 0 1,902 1,902 (‡) (‡) (‡) 1.1.2) Captive Air Training Missile - Block II (2) Prior Years Deliveries: 480 2 2022 NAVY 38 8 30 3 3 3 3 3 3 3 3 3 3 2 2022 AF (‡) 72 12 60 6 6 6 6 6 6 6 6 6 6 2 2022 Total 110 20 90 9 9 9 9 9 9 9 9 9 9 2 2023 NAVY 39 0 39 - - - - - - - - - - 4 4 4 3 3 3 3 3 3 3 3 3 0 2 2023 AF (‡) 97 0 97 - - - - - - - - - - 9 8 8 8 8 8 8 8 8 8 8 8 0 2 2023 FMS 84 0 84 - - - - - - - - - - 7 7 7 7 7 7 7 7 7 7 7 7 2 2023 Total 220 0 220 - - - - - - - - - - 20 19 19 18 18 18 18 18 18 18 18 18 2 2024 NAVY 41 0 41 - - - - - - - - - - - - - - - - - - - - - - 3 2 2024 ARMY 2 2024 AF 2 2024 FMS 2 2024 Total 2 2025 NAVY 2 2025 AF (‡) 2 2025 FMS 2 2025 2 2 (‡) (‡) 0 0 - - - - - - - - - - - - - - 0 0 - - 0 3 35 5 45 1 0 1 - - - - - - - - - - - - - - - - - - - - - - 1 55 0 55 - - - - - - - - - - - - - - - - - - - - - - 5 68 0 68 - - - - - - - - - - - - - - - - - - - - - - 6 6 56 165 0 165 - - - - - - - - - - - - - - - - - - - - - - 15 14 136 44 0 44 A - - - - - - - - - - - - - - - - 44 58 0 58 A - - - - - - - - - - - - - - - - 58 93 0 93 A - - - - - - - - - - - - - - - - 93 Total 195 0 195 - - - - - - - - - - - - - - - - 195 2026 NAVY 31 0 31 A - - - - - 31 2026 AF (‡) 24 0 24 A - - - - - 24 2 2026 FMS 150 0 150 A - - - - - 150 2 2026 Total 205 0 205 - - - - - 205 2 2027 NAVY 29 0 29 29 2 2027 AF (‡) 18 0 18 18 2 2027 Total 47 0 47 (‡) (‡) (‡) (‡) 0 47 O C T LI 2209 - Sidewinder Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 96 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) All Up Round - Block II PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1356 1 2021 NAVY 220 220 0 0 1 2021 (‡) 206 206 0 0 AF (‡) 1 2021 FMS 84 84 0 1 2021 Total 510 510 0 1 2022 NAVY 94 94 0 0 1 2022 ARMY 116 116 0 0 1 2022 AF (‡) 140 140 0 0 1 2022 FMS 157 157 0 1 2022 Total 507 507 0 1 2023 NAVY 85 85 0 0 1 2023 (‡) 448 448 0 0 AF (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2023 FMS 341 341 0 1 2023 Total 874 874 0 1 2024 NAVY 75 14 61 7 6 6 6 6 6 6 6 6 6 0 1 2024 ARMY 15 4 11 2 1 1 1 1 1 1 1 1 1 0 1 2024 (‡) 256 44 212 22 22 21 21 21 21 21 21 21 21 0 AF (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2024 FMS 592 100 492 50 50 49 49 49 49 49 49 49 49 1 2024 Total 938 162 776 81 79 77 77 77 77 77 77 77 77 - - - - 1 2025 NAVY 112 0 112 - - - - - - - - - - 10 10 10 10 9 9 9 9 9 9 9 9 0 1 2025 ARMY 129 0 129 - - - - - - - - - - 11 11 11 11 11 11 11 11 11 10 10 10 0 1 2025 (‡) 558 0 558 - - - - - - - - - - 47 47 47 47 47 47 46 46 46 46 46 46 0 AF (‡) (‡) 0 - - - - - - - - - - 0 1 2025 FMS 808 0 808 - - - - - - - - - - 68 68 68 68 67 67 67 67 67 67 67 67 1 2025 Total 1,607 0 1,607 - - - - - - - - - - 136 136 136 136 134 134 133 133 133 132 132 132 1 2026 NAVY 96 0 96 - - - - - - - - - - - - - - - - - - - - - - 8 8 80 1 2026 ARMY 76 0 76 - - - - - - - - - - - - - - - - - - - - - - 7 7 62 1 2026 AF (‡) 144 0 144 - - - - - - - - - - - - - - - - - - - - - - 12 12 120 1 2026 FMS 634 0 634 - - - - - - - - - - - - - - - - - - - - - - 53 53 528 1 2026 Total 950 0 950 - - - - - - - - - - - - - - - - - - - - - - 80 80 790 (‡) (‡) O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L 0 - A U G - 0 S E P Volume 1 - 97 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 ARMY 1 2027 AF 1 2027 FMS 1 2027 Total PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 277 0 277 A - - - - - - - - - - - - - - - - 277 476 0 476 A - - - - - - - - - - - - - - - - 476 791 0 791 A - - - - - - - - - - - - - - - - 791 358 0 358 A - - - - - - - - - - - - - - - - 358 1,902 0 1,902 - - - - - - - - - - - - - - - - 1,902 (‡) (‡) (‡) 1.1.2) Captive Air Training Missile - Block II (2) Prior Years Deliveries: 480 2 2022 NAVY 38 38 0 2 2022 AF (‡) 72 72 0 2 2022 Total 110 110 0 2 2023 NAVY 39 39 0 0 2 2023 AF (‡) 97 97 0 0 2 2023 FMS 84 84 0 2 2023 Total 220 220 0 2 2024 NAVY 41 6 35 2 2024 ARMY 1 1 0 2 2024 AF 55 10 45 5 5 5 5 5 4 4 4 4 4 2 2024 FMS 68 12 56 6 6 6 6 6 6 5 5 5 5 2 2024 Total 165 29 136 14 14 14 14 14 14 13 13 13 13 2 2025 NAVY 44 0 44 - - - - - - - - - - 4 4 4 4 4 4 4 4 3 3 3 3 0 2 2025 AF (‡) 58 0 58 - - - - - - - - - - 5 5 5 5 5 5 5 5 5 5 4 4 0 2 2025 FMS 93 0 93 - - - - - - - - - - 8 8 8 8 8 8 8 8 8 7 7 7 2 2025 Total 195 0 195 - - - - - - - - - - 17 17 17 17 17 17 17 17 16 15 14 14 2 2026 NAVY 31 0 31 - - - - - - - - - - - - - - - - - - - - - - 2 2026 AF 2 2026 FMS 2 2026 2 2027 2 2027 AF 2 2027 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - 3 3 - 3 - 3 - 3 - 4 - 4 - 4 - 4 - - - - - - - - - - - - - - - 0 4 - 0 - 0 0 0 - - - - - - - - - - - - - - 0 0 - 3 0 3 25 24 0 24 - - - - - - - - - - - - - - - - - - - - - - 2 2 20 150 0 150 - - - - - - - - - - - - - - - - - - - - - - 13 13 124 Total 205 0 205 - - - - - - - - - - - - - - - - - - - - - - 18 18 169 NAVY 29 0 29 A - - - - - - - - - - - - - - - - 29 (‡) 18 0 18 A - - - - - - - - - - - - - - - - 18 Total 47 0 47 - - - - - - - - - - - - - - - - 47 (‡) O C T LI 2209 - Sidewinder Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 98 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) All Up Round - Block II PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1356 1 2021 NAVY 220 220 0 0 1 2021 (‡) 206 206 0 0 AF (‡) 1 2021 FMS 84 84 0 1 2021 Total 510 510 0 1 2022 NAVY 94 94 0 0 1 2022 ARMY 116 116 0 0 1 2022 AF (‡) 140 140 0 0 1 2022 FMS 157 157 0 1 2022 Total 507 507 0 1 2023 NAVY 85 85 0 0 1 2023 (‡) 448 448 0 0 AF (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2023 FMS 341 341 0 1 2023 Total 874 874 0 1 2024 NAVY 75 75 0 0 1 2024 ARMY 15 15 0 0 1 2024 (‡) 256 256 0 0 AF (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2024 FMS 592 592 0 1 2024 Total 938 938 0 1 2025 NAVY 112 112 0 0 1 2025 ARMY 129 129 0 0 1 2025 (‡) 558 558 0 0 AF (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2025 FMS 808 808 0 1 2025 Total 1,607 1,607 0 1 2026 NAVY 96 16 80 8 8 8 8 8 8 8 8 8 8 0 1 2026 ARMY 76 14 62 7 7 6 6 6 6 6 6 6 6 0 1 2026 AF (‡) 144 24 120 12 12 12 12 12 12 12 12 12 12 0 1 2026 FMS 634 106 528 53 53 53 53 53 53 53 53 52 52 1 2026 Total 950 160 790 80 80 79 79 79 79 79 79 78 78 (‡) (‡) 0 - O C T LI 2209 - Sidewinder Navy - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - - - - - - - - - - - - - - 0 0 A U G UNCLASSIFIED Page 17 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 99 0 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 ARMY 1 2027 AF 1 2027 FMS 1 2027 Total PROC QTY Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 277 0 277 - - - - - - - - - - 24 23 23 23 23 23 23 23 23 23 23 23 0 476 0 476 - - - - - - - - - - 40 40 40 40 40 40 40 40 39 39 39 39 0 791 0 791 - - - - - - - - - - 66 66 66 66 66 66 66 66 66 66 66 65 0 358 0 358 - - - - - - - - - - 30 30 30 30 30 30 30 30 30 30 29 29 1,902 0 1,902 - - - - - - - - - - 160 159 159 159 159 159 159 159 158 158 157 156 (‡) (‡) (‡) 1.1.2) Captive Air Training Missile - Block II 0 - - 0 (2) Prior Years Deliveries: 480 2 2022 NAVY 38 38 0 2 2022 AF (‡) 72 72 0 2 2022 Total 110 110 0 2 2023 NAVY 39 39 0 0 2 2023 AF (‡) 97 97 0 0 2 2023 FMS 84 84 0 2 2023 Total 220 220 0 2 2024 NAVY 41 41 0 0 2 2024 ARMY 1 1 0 0 2 2024 AF 55 55 0 0 2 2024 FMS 68 68 0 2 2024 Total 165 165 0 2 2025 NAVY 44 44 0 0 2 2025 AF (‡) 58 58 0 0 2 2025 FMS 93 93 0 2 2025 Total 195 195 0 2 2026 NAVY 31 6 25 3 3 3 3 3 2 2 2 2 2 0 2 2026 AF (‡) 24 4 20 2 2 2 2 2 2 2 2 2 2 0 2 2026 FMS 150 26 124 13 13 13 13 12 12 12 12 12 12 2 2026 Total 205 36 169 18 18 18 18 17 16 16 16 16 16 2 2027 NAVY 29 0 29 - - - - - - - - - - 3 3 3 3 3 2 2 2 2 2 2 2 2 2027 AF (‡) 18 0 18 - - - - - - - - - - 2 2 2 2 2 2 1 1 1 1 1 1 2 2027 Total 47 0 47 - - - - - - - - - - 5 5 5 5 5 4 3 3 3 3 3 3 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - O C T LI 2209 - Sidewinder Navy - - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - - - - - - - - - - - - - - 0 0 - - A U G UNCLASSIFIED Page 18 of 22 S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #6 - M A R - A P R - M A Y - J U N - J U L - - 0 0 0 A U G S E P Volume 1 - 100 0 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / SIDEWINDER BLOCK II Production Rates (Each / Year) Procurement Leadtime (Months) Initial MFR Ref # Manufacturer Name - Location 1 Raytheon Missile Systems (14) - Tucson, AZ 2 Raytheon Missile System (15) - Tucson, AZ ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 300 600 2,500 0 9 13 22 0 6 29 35 300 600 2,500 0 9 16 25 0 6 29 35 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (14) (15) AUR BLK II CATM LI 2209 - Sidewinder Navy UNCLASSIFIED Page 19 of 22 P-1 Line #6 Volume 1 - 101 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2209 / Sidewinder ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Inertial Measurement Unit (IMU) Obsolescence upgrade MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 27.655 5.615 13.436 16.315 0.000 16.315 17.739 13.395 13.280 12.097 40.570 - - - - - - - - - - - 27.655 5.615 13.436 16.315 0.000 16.315 17.739 13.395 13.280 12.097 40.570 - - - - - - - - - - - 27.655 5.615 13.436 16.315 0.000 16.315 17.739 13.395 13.280 12.097 40.570 Total 160.102 160.102 160.102 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AIM-9X BLK II is an inner boundary, beyond visual range (BVR), data-linked, infrared (IR) missile used by joint force air campaigns in all-weather, full spherical engagements to kill target sets employing sophisticated electronic attack, modern countermeasures, and advanced stealth technology. This procurement of AIM-9X-4 Guidance Units (GUs) is to improve reliability and availability of missiles by replacing the obsolete AIM-9X-2 GU through retrofit by attrition. This will result in increased operational availability of up to 44% in the 2027-2037 timeframe. It will also reduce repair Turn Around Time for GU related failures from 270 days to as few as 14 days. Additionally, it is projected that 271 missiles will be preserved in the inventory from FY 2027 to FY 2037 as a result of this upgrade. The AIM-9X-2 GU accounts for 95% of all missile failures, and this GU uses an obsolete, low-reliability mechanical Inertial Measurement Unit (IMU) that must be replaced in 80% of these failures. The upgraded AIM-9X-4 GU contains a Ring Laser Gyro that is not the same form or fit, which is why the entire GU must be replaced. LI 2209 - Sidewinder Navy UNCLASSIFIED Page 20 of 22 P-1 Line #6 Volume 1 - 102 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2209 / Sidewinder Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Inertial Measurement Unit (IMU) Obsolescence upgrade MDAP/MAIS Code: Models of Systems Affected: AIM-9X-2 Related RDT&E PEs: 0207161N Modification Type: Reliability Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Inertial Measurement Unit (IMU) Obsolescence upgrade A Kits Recurring 1.1.1) Guidance Unit - Organic 148 / 27.528 (17) 1.1.2) Guidance Unit Containers - Organic 26 / 0.127 (18) Subtotal: Recurring Subtotal: Inertial Measurement Unit (IMU) Obsolescence upgrade Subtotal: Procurement, All Modification Items - / 27.655 174 / 27.655 - / 27.655 29 / 5.548 80 / 13.246 15 / 0.067 / 5.615 - 44 / 5.615 / 5.615 - 95 / 16.124 - / - 40 / 0.191 - / - / 16.315 - / - - 135 / 16.315 - / - 135 / 16.315 / 16.315 - / - - / - - / - 41 / 0.190 - / 13.436 121 / 13.436 - / 13.436 - - 95 / 16.124 103 / 17.553 40 / 0.191 / 16.315 / 16.315 75 / 13.220 38 / 0.186 - / 17.739 141 / 17.739 - / 17.739 74 / 13.110 34 / 0.175 - / 13.395 109 / 13.395 - / 13.395 65 / 11.934 32 / 0.170 - / 13.280 106 / 13.280 - / 13.280 30 / 0.163 - / 12.097 95 / 12.097 - / 12.097 210 / 39.964 879 / 158.227 103 / 0.606 - / 40.570 359 / 1.875 - / 160.102 313 / 40.570 1,238 / 160.102 - / 40.570 - / 160.102 Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2209 - Sidewinder Navy 27.655 5.615 13.436 16.315 0.000 UNCLASSIFIED Page 21 of 22 16.315 17.739 13.395 P-1 Line #6 13.280 12.097 40.570 160.102 Volume 1 - 103 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2209 / Sidewinder ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Inertial Measurement Unit (IMU) Obsolescence upgrade MDAP/MAIS Code: Modification Item 1 of 1: Inertial Measurement Unit (IMU) Obsolescence upgrade Manufacturer Information Manufacturer Name: RAYTHEON Company Manufacturer Location: TUCSON, AZ Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jun 2025 May 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Delivery Dates Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Jun 2032 Jun 2033 Footnotes: (17) (18) Installation occurs during missile repair at no additional cost. No additional support costs are required. Containers are procured to ship Guidance Units and are budgeted 1 container for every 2 Guidance Units, for each service separately (USN and USMC). LI 2209 - Sidewinder Navy UNCLASSIFIED Page 22 of 22 P-1 Line #6 Volume 1 - 104 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2210 / Joint Advance Tactical Missile (JATM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 - - 0.000 0.000 - - 0.000 0.000 301.858 301.858 301.858 557.806 557.806 557.806 0.000 0.000 0.000 557.806 557.806 557.806 1,027.474 1,027.474 1,027.474 1,378.874 1,378.874 1,378.874 To FY 2031 Complete 1,331.850 1,331.850 1,331.850 1,331.134 1,331.134 1,331.134 - Total 5,928.996 5,928.996 5,928.996 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. Justification: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 2210 - Joint Advance Tactical Missile (JATM) Navy UNCLASSIFIED Page 1 of 1 P-1 Line #7 Volume 1 - 105 === page 146 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 106 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 1,528 102 55 106 - 106 436 424 413 413 1,586 5,063 6,895.500 788.223 470.278 733.159 733.159 3,841.893 3,915.799 4,027.999 4,136.011 6,264.788 31,073.650 333.841 117.547 107.903 6,561.659 670.676 362.375 451.461 107.830 7,013.120 778.506 362.375 - 0.000 - 733.159 - - 0.000 733.159 - 733.159 - 0.000 733.159 3,841.893 3,841.893 3,915.799 3,915.799 4,027.999 4,027.999 To FY 2031 Complete 4,136.011 4,136.011 6,264.788 6,264.788 Total 559.291 30,514.359 559.291 31,073.650 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - 0.000 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.000 4,512.762 7,727.676 8,550.509 6,916.594 - 6,916.594 8,811.681 9,235.375 9,753.024 10,014.554 3,950.055 6,137.399 Description: The SM-6 BLK I/IA/IAU provides an extended range engagement capability to provide the air superiority and the umbrella of protection for joint U.S. forces and allies against the full spectrum of manned-fixed and rotary-winged aircraft, unmanned aerial vehicles, and land attack and anti-ship cruise missiles in flight. This capability contributes significantly to the continuous protection of forward deployed ground maneuver forces as well as theater assets. The SM-6 is the primary extended range air defense weapon for AEGIS cruisers and destroyers, Constellation class frigate and potentially future combatants. SM-6 BLK IA reflects a funding profile for a base plus two options that began in FY 2024 and completes in FY 2026. Advance Procurement information for this program is provided in exhibit 2234C. The SM-6 profile enables ramped production quantities defined by the Munitions Acceleration Council (MAC) via a Multi-Year Procurement (MYP) contract that begins in FY 2026 and completes in FY 2030. The MYP was authorized in Section 8010 (c) of the Consolidated Appropriations Act of 2026. The MYP strategy for STANDARD Missile expands the capacity of the All-Up-Round (AUR) production line to 500 AURs per year without additional government investment in capacity by leveraging savings to the contractor generated through economic order quantities of material from sub-vendors, enabled by the consistent demand laid forth in the MYP. Investments for increased production start-up began in FY 2022, for procuring additional special tooling and test equipment, to support increasing SM-6 BLK IAU production capacity to deliver 200 per year by FY 2028. The FY 2026 spend plan amount for Standard Missile includes $362,375 thousand of discretionary and $1,048,000 thousand of mandatory (reconciliation) for a total of $1,410,375 thousand. - FY 2026 Discretionary: Based on the contract, the program will procure 55 SM-6 BLK IAs. - FY 2026 Mandatory (Reconciliation) supports $630,000 thousand to procure 114 SM-6 BLK IAs, $93,000 thousand for replacement of Navy long-range air and missile defense interceptors, $100,000 thousand for development of a second solid rocket motor source for Navy air defense, and $225,000 thousand for expansion of production capacity for Navy air defense and anti-ship missiles. The FY 2027 request for Standard missile includes $733,159 thousand of discretionary and $3,599,221 thousand of mandatory for a total of $4,332,380 thousand. The mandatory and discretionary funds are necessary to fully fund contract requirements for 239 SM-6 BLK IAs at a unit cost of $5,500 thousand and 301 SM-6 BLK IAUs at a unit cost of $7,841 thousand; 540 SM-6 Block IA/IAU (Mk 21 Mod 4) canisters at a unit cost of $402 thousand; production engineering support at a total cost of $30,689 thousand; SM-6 BLK IA/IAU Diminishing Manufacturing Sources (DMS) at a total cost of $24,870 thousand; SM-6 BLK IA/IAU Containers for a total of $514 thousand; SM-6 BLK IA/IAU ILS/Fleet Documentation for a total of $1,739 thousand; SM-6 BLI IA/IAU Install/Checkout Equip/ Training Material for a total of $3,849 thousand. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 1 of 24 P-1 Line #8 Volume 1 - 107 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / STANDARD MISSILE P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1,528 / 6,895.500 102 / 788.223 55 / 470.278 106 / 733.159 - / 0.000 106 / 733.159 1,528 / 6,895.500 102 / 788.223 55 / 470.278 106 / 733.159 - / 0.000 106 / 733.159 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: SM-6 BLK IA/IAU: FY 2027 Discretionary: Based on current discretionary funding of $733,159 thousand and current estimates, the program will procure 106 SM-6 BLK IAs and canisters to support warfighter requirements as well as required support costs such as production engineering, Diminishing Manufacturing Sources (DMS), containers, fleet documentation, and install/checkout equipment. FE831 Production Engineering Support: FY 2027 funds contract related engineering services efforts for SM-6 BLK IA to support the SM-6 BLK IAU new electronics unit being incorporated in forward flow production. The effort to support the new electronics unit will be complete in FY 2027. FE851 Diminishing Manufacturing Sources: is to support the plate 3A and TDD obsolescence replacements being incorporated in forward flow production. FE958 Containers: is required to support SM-6 BLK IA/IAU procurement deliveries by providing shipping containers. FE971 Install/checkout: is to procure SM-6 BLK IA/IAU IFTS kits to support flight test round buildup. The requirement for the new C-Band and current S-band kits are required to support an increase in flight test events. FE981 ILS/Fleet Documentation: is to cover the incorporation of BLK IA/IAU additional engineering change proposals (ECPs) waiver and deviations. Also develops and updates the Capabilities and Liabilities (C&L) documentation to incorporate the new electronics units and obsolesces replacements, as well as round requirement plans for delivery and on-load for AURs for firing events. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 2 of 24 P-1 Line #8 Volume 1 - 108 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / STANDARD MISSILE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC 55 106 6,895.500 788.223 470.278 733.159 333.841 117.547 107.903 6,561.659 670.676 362.375 451.461 107.830 7,013.120 778.506 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 102 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 1,528 - - 106 0.000 733.159 - 733.159 - 0.000 - 362.375 FY 2027 Total - 733.159 - 733.159 - 0.000 733.159 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 4,512.762 - 7,727.676 - 8,550.509 - 6,916.594 - - 6,916.594 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - SM-6 Cost Recurring Cost 1.1.1) FE002 SM-6 Block I All Up Round Missile (†) 1.1.2) FE002 SM-6 Block IA All Up Round Missile (†) (1) 1.1.4) FE002 SM-6 Dual Thrust Rocket 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk (†) 1.1.9) FE002 Production Start Up (3) 1.1.10) FE002 Canister - SM-6 Block (†) (4) IA (Mk 21 Mod 4) 1.1.11) FE002 SM-6 IAU Transition to Production (TTP) (5) 681 1,888.464 9,675.128 78 754.660 - (†) (2) Motor/Booster 21 Mod 3/Mod 4) 2,773.075 - - - 5,505.051 - 78 - 429.394 - 5,404.636 - 55 - 297.255 - - - - - - - - - - - - - - - 4,348.000 106 460.888 - - - 4,348.000 106 460.888 1,586.000 106 168.116 - - - 1,586.000 106 168.116 3,277.647 750 2,458.235 - - - - - - - - - - - - - - - 254.524 1,431 364.224 - - - - - - - - - - - - - - - - 311.733 - - 97.965 - - 30.359 - - - - - - - - - 97 39.497 78 29.717 55 18.357 106 42.446 - - - 106 42.446 - - - - - 51.000 - - - - - - - - 407.186 - LI 2234 - Standard Missile Navy 380.987 - 333.764 - UNCLASSIFIED Page 3 of 24 400.434 - P-1 Line #8 400.434 - Volume 1 - 109 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / STANDARD MISSILE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) 1.1.12) FE00079 Israel Supplemental (†) (6) 5,380.967 FY 2025 Total Cost Qty (Each) ($ M) 30 161.429 Unit Cost ($ K) 6,068.375 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 24 145.641 - - ($ K) - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - - ($ K) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - Subtotal: Recurring Cost - - 5,978.242 - - 702.717 - - 396.971 - - 671.450 - - - - - 671.450 Subtotal: Hardware - SM-6 Cost - - 5,978.242 - - 702.717 - - 396.971 - - 671.450 - - - - - 671.450 2.1) FE831 SM-6 BLKI/IA Production Engineering/ Support - - 391.028 - - 32.580 - - 46.516 - - 30.737 - - - - - 30.737 2.3) FE851 SM-6 BLKI/IA Component Improvement - - 93.930 - - - - - - - - - - - - - - - 2.4) FE851 SM-6 BLKI/IA Diminishing Manufacturing Sources (DMS) - - 171.207 - - 47.456 - - 24.268 - - 24.870 - - - - - 24.870 2.5) FE951 SM-6 BLKI/ IA Tools and Test Equipment - - 13.968 - - - - - - - - - - - - - - - 2.6) FE958 SM-6 BLKI/IA Containers - - 3.963 - - 0.494 - - 0.504 - - 0.514 - - - - - 0.514 2.7) FE981 SM-6 BLKI/IA ILS/Fleet Documentation - - 12.142 - - 2.100 - - 2.019 - - 1.739 - - - - - 1.739 2.8) FE971 SM-6 BLI/IA Install/Checkout Equip/ Training Material - - 49.629 - - 2.801 - - - - - 3.849 - - - - - 3.849 - - 50.000 - - - - - - - - - - - - - - - - - 785.867 - - 85.431 - - 73.307 - - 61.709 - - - - - 61.709 3.1) WAXXX Acquisition Workforce Fund - 2009 - - 1.103 - - - - - - - - - - - - - - - 3.2) Enacted Rescissions - - 16.148 - - - - - - - - - - - - - - - - - 114.140 - - 0.075 - - - - - - - - - - - - - - 131.391 - - 0.075 - - - - - - - - - - - - 1,528 6,895.500 102 788.223 - - 0.000 Support - SM-6 Cost Cost 2.10) FE961 Second Source Rocket Motor (7) Subtotal: Support - SM-6 Cost Cost Support - Other Cost 3.3) FE00079 Israel Supplemental Support Subtotal: Support - Other Cost Gross/Weapon System Cost (8) 4,512.762 LI 2234 - Standard Missile Navy 7,727.676 8,550.509 55 470.278 UNCLASSIFIED Page 4 of 24 6,916.594 106 733.159 P-1 Line #8 6,916.594 106 733.159 Volume 1 - 110 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2234 / Standard Missile ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 1 / STANDARD MISSILE MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (1) In FY 2026 based on the negotiated contract, the program will procure 28 SM-6 BLK IAs; an additional procurement of 27 SM-6 BLK IAs will be procured on a follow on contract. FY 2027 is the last year of the SM-6 BLK IA production. In FY 2027 based on current estimates, the program will procure 106 SM-6 BLK IA. FY 2027 is the last year of the SM-6 BLK IA production. FY 2027 is the first year of direct negotiations with Aerojet to procure the MK104 Dual Thrust Rocket Motor (DTRM) and MK72 booster, which is shown separately in cost element 1.1.4. (2) (3) (4) (5) (6) FY 2027 is the first year of direct negotiations with Aerojet to procure the MK104 Dual Thrust Rocket Motor (DTRM) and MK72 booster. FY 2027 production startup is zeroed from FY 2026 as the program completes the replication of special tooling and test equipment. FY 2027 through FY 2031 Canisters are not procured through the prime missile contractor and MK21 Mod 4 canisters are procured for the SM-6 BLK IAU missiles. FY 2027 TTP is zeroed from FY 2026. FY 2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) or Ukraine Security Supplemental Appropriations Act, 2024 (Division B of Public Law 118-50). FY 2025 DON has received $145.7 million for the procurement of 24 SM-6 BLK IAs for the replacement of Navy stock. This results in an increase quantities from 79 to 103 SM-6 BLK IAs. Unit cost increase is due to All Up Rounds and Canisters being combined in total cost. (7) (8) Congressional increase to find a second source rocket motor producer. FY 2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) or Ukraine Security Supplemental Appropriations Act, 2024 (Division B of Public Law 118-50). LI 2234 - Standard Missile Navy UNCLASSIFIED Page 5 of 24 P-1 Line #8 Volume 1 - 111 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements 1.1.1) FE002 SM-6 Block I All Up (†) Round Missile 1.1.2) FE002 SM-6 Block IA All Up 1.1.2) FE002 SM-6 Block IA All Up (†) Round Missile 1.1.2) FE002 SM-6 Block IA All Up (†) Round Missile 1.1.2) FE002 SM-6 Block IA All Up (†) Round Missile 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster (†) 1.1.5) FE002 SM-6 Block I/IA All Up 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile ✓ 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.5) FE002 SM-6 Block I/IA All Up (†) Round Missile 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) LI 2234 - Standard Missile Navy FY Contractor and Location 2017 Raytheon CO / Tucson AZ SS / FP NAVSEA Mar 2017 Sep 2019 125 2,209.528 Y Jan 2016 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Sep 2024 Nov 2027 78 5,241.269 Y Jul 2023 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA May 2025 Nov 2028 78 5,505.051 Y Jul 2023 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA May 2026 Nov 2029 55 5,404.636 Y Jul 2023 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA May 2027 Nov 2030 106 4,348.000 Y Jul 2025 2027 Aerojet / Camden AR SS / FPIF NAVSEA May 2027 Jul 2030 106 1,586.000 Y Aug 2025 Raytheon CO / Tucson AZ SS / FFP NAVSEA Sep 2018 Jul 2020 117 3,327.504 Y Jan 2016 2018 Raytheon CO / Tucson AZ SS / FFP NAVSEA Sep 2018 Dec 2020 8 3,327.504 Y Jan 2016 2019 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Dec 2019 Nov 2021 125 3,297.352 Y Oct 2017 2020 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Apr 2020 Jan 2023 125 3,293.688 Y Oct 2017 2021 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Jun 2021 Jan 2024 125 3,271.288 Y Oct 2017 2022 Raytheon CO / Tucson AZ SS / FPIF NAVSEA May 2022 Jan 2025 125 3,270.240 Y Oct 2017 2023 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Mar 2023 Jan 2026 125 3,257.416 Y Oct 2017 2017 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Mar 2017 May 2018 125 211.672 Y Feb 2016 2018 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Mar 2018 May 2019 117 216.342 Y Feb 2016 2018 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Mar 2018 May 2019 8 264.500 Y Feb 2016 2019 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Mar 2019 May 2020 125 267.200 Y Feb 2018 2018 (†) Round Missile ✓ Item Number / Title [DODIC]: 1 / STANDARD MISSILE Method/Type or Funding Vehicle 2024 (†) Round Missile P-1 Line Item Number / Title: 2234 / Standard Missile (9) (10) Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 6 of 24 P-1 Line #8 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 112 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C P-1 Line Item Number / Title: 2234 / Standard Missile Item Number / Title [DODIC]: 1 / STANDARD MISSILE FY Contractor and Location Method/Type or Funding Vehicle 2020 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Mar 2020 May 2021 125 268.800 Y Feb 2018 2021 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Dec 2020 Feb 2022 125 281.600 Y Feb 2018 2022 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Dec 2021 Feb 2023 125 287.232 Y Feb 2018 BAE / MINNEAPOLIS, MN TBD NAVSEA Mar 2024 May 2025 125 292.976 Y Feb 2022 2024 BAE / MINNEAPOLIS, MN SS / FFP NAVSEA Jun 2024 Aug 2025 97 407.186 Y Feb 2022 2025 BAE / MINNEAPOLIS, MN SS / FFP NAVSEA Mar 2025 May 2026 78 380.987 Y Feb 2022 2026 BAE / MINNEAPOLIS, MN SS / FFP NAVSEA Mar 2026 May 2027 55 333.764 Y Feb 2022 2027 BAE / MINNEAPOLIS, MN SS / FFP NAVSEA Mar 2027 May 2028 106 400.434 Y Jul 2026 2024 Raytheon CO / Tucson AZ SS / FFP NAVSEA Sep 2024 Aug 2028 30 5,380.967 N Jul 2023 2025 Raytheon CO / Tucson AZ SS / FFP NAVSEA Jun 2025 Aug 2029 24 6,068.375 N Jul 2023 MK72 Booster 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Sep 2024 Jun 2027 97 424.402 Y MK104 Dual Thrust Rocket Motor(DTRM) 2024 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Sep 2024 Jun 2027 97 315.268 Y Guidance Section (GS) Parts 2024 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Sep 2024 Jun 2027 97 472.907 Y Guidance Section (GS) Parts 2025 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Sep 2025 Jun 2028 115 937.652 Y Cost Elements 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.7) FE002 Canister - SM-6 Block (†) I/IA (Mk 21 Mod 3/Mod 4) 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (†) 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (†) 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (†) 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (†) 1.1.12) FE00079 Israel Supplemental (†) 1.1.12) FE00079 Israel Supplemental (†) 2023 (11) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Advance Procurement (†) indicates the presence of a P-21 Footnotes: (9) Lines 1.1.2 AURs Delivery schedule reflects expected delivery dates. (10) (11) Lines 1.1.3 AURs Delivery schedule reflects contracted delivery dates. This is an open competition, system did not allow for TBD in contract and location LI 2234 - Standard Missile Navy UNCLASSIFIED Page 7 of 24 P-1 Line #8 Volume 1 - 113 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2017 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2016 1 OCT Calendar Year 2017 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2018 M A Y J U N J U L Calendar Year 2018 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 0 1.1.2) FE002 SM-6 Block IA All Up Round Missile 125 A - - - - - - - - - - - - - - - - - - - 125 (1) 2 2024 NAVY 78 0 78 78 2 2025 NAVY 78 0 78 78 2 2026 NAVY 55 0 55 55 2 2027 NAVY 106 0 106 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 (2) 106 106 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 0 117 A - 8 0 8 A - (14) 0 125 125 NAVY 125 0 125 125 NAVY 125 0 125 125 2022 NAVY 125 0 125 125 2023 NAVY 125 0 125 125 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 2021 4 4 117 125 117 8 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 0 125 - - 10 10 10 11 11 73 5 2018 NAVY 117 0 117 A - - - - - - - 117 5 2018 NAVY 8 0 8 A - - - - - - - 5 2019 NAVY 125 0 125 125 5 2020 NAVY 125 0 125 125 5 2021 NAVY 125 0 125 125 5 2022 NAVY 125 0 125 125 5 2023 NAVY 125 0 125 125 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) A - - - - - - - - - - - - 8 (4) 6 2024 NAVY 97 0 97 97 6 2025 NAVY 78 0 78 78 6 2026 NAVY 55 0 55 55 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 114 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2017 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2016 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2018 Calendar Year 2017 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2018 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 106 106 30 (6) 7 2024 NAVY 30 0 30 7 2025 NAVY 24 0 24 24 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 115 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 0 1.1.2) FE002 SM-6 Block IA All Up Round Missile 125 - - - - - - - - - - - 6 6 8 9 9 12 16 16 19 1 2 2 6 13 (1) 2 2024 NAVY 78 0 78 78 2 2025 NAVY 78 0 78 78 2 2026 NAVY 55 0 55 55 2 2027 NAVY 106 0 106 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 (2) 106 106 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 0 117 - - - - - - - - - - - - - - - - - - - - - 10 11 11 8 0 8 - - - - - - - - - - - - - - - - - - - - - - - - 8 (14) 0 125 A - - - - - - - - - - 125 NAVY 125 0 125 A - - - - - - 125 NAVY 125 0 125 125 2022 NAVY 125 0 125 125 2023 NAVY 125 0 125 125 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 2021 4 4 117 125 85 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 52 73 11 11 11 10 10 10 10 5 2018 NAVY 117 0 117 - - - - - - - 10 9 9 9 10 10 5 2018 NAVY 8 0 8 - - - - - - - 1 1 2 1 1 2 5 2019 NAVY 125 0 125 A - - 5 2020 NAVY 125 0 125 5 2021 NAVY 125 0 125 125 5 2022 NAVY 125 0 125 125 5 2023 NAVY 125 0 125 125 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) 0 - - - - - 10 10 10 10 10 10 0 - - - - - - 10 10 10 11 11 73 A - - - - - - - 125 0 - (4) 6 2024 NAVY 97 0 97 97 6 2025 NAVY 78 0 78 78 6 2026 NAVY 55 0 55 55 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 116 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2020 Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 106 106 30 (6) 7 2024 NAVY 30 0 30 7 2025 NAVY 24 0 24 24 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 117 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 112 1.1.2) FE002 SM-6 Block IA All Up Round Missile 13 6 7 0 (1) 2 2024 NAVY 78 0 78 78 2 2025 NAVY 78 0 78 78 2 2026 NAVY 55 0 55 55 2 2027 NAVY 106 0 106 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 (2) 106 106 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 32 85 12 13 13 13 13 14 8 0 8 - - 3 2 2 1 (14) 0 125 - - - - - - - - NAVY 125 0 125 - - - - - - - - NAVY 125 0 125 2022 NAVY 125 0 125 2023 NAVY 125 0 125 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 2021 4 4 117 125 2 2 3 0 0 - - - - - - - - - - A - - - - - 9 10 10 10 11 11 11 11 10 11 11 10 - - - - - - - - - - - 125 - - - - - - - - - - - 125 A - - - - - 125 125 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 5 2019 NAVY 125 52 73 11 11 11 10 10 10 10 5 2020 NAVY 125 0 125 - - - - - - - 10 10 10 11 11 11 11 11 10 10 10 10 5 2021 NAVY 125 0 125 A - - - - - - - - - - - - - - 10 10 10 11 11 11 11 11 40 5 2022 NAVY 125 0 125 A - - - - - - - - - - 125 5 2023 NAVY 125 0 125 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) 0 0 0 125 (4) 6 2024 NAVY 97 0 97 97 6 2025 NAVY 78 0 78 78 6 2026 NAVY 55 0 55 55 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 118 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2022 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 106 106 30 (6) 7 2024 NAVY 30 0 30 7 2025 NAVY 24 0 24 24 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 119 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 125 1.1.2) FE002 SM-6 Block IA All Up Round Missile 0 0 (1) 2 2024 NAVY 78 0 78 2 2025 NAVY 78 0 78 2 2026 NAVY 55 0 55 55 2 2027 NAVY 106 0 106 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 A - 78 78 (2) 106 106 0 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 117 0 8 8 0 (14) 115 10 10 NAVY 125 0 125 - - - 10 10 10 10 11 11 10 10 11 10 11 11 2021 NAVY 125 0 125 - - - - - - - - - - - - - - - 10 10 10 10 11 11 10 10 11 32 4 2022 NAVY 125 0 125 - - - - - - - - - - - - - - - - - - - - - - - - 125 4 2023 NAVY 125 0 125 A - - - - - - - - - - - - - - - - - - - 125 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 117 125 0 0 0 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 0 5 2019 NAVY 125 125 0 0 5 2020 NAVY 125 125 0 5 2021 NAVY 125 85 40 10 10 10 10 5 2022 NAVY 125 0 125 - - - - 5 2023 NAVY 125 0 125 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) 0 10 10 11 11 11 11 11 10 10 10 10 0 A - - - - - - - 125 A - - - - 97 (4) 6 2024 NAVY 97 0 97 6 2025 NAVY 78 0 78 6 2026 NAVY 55 0 55 78 55 O C T LI 2234 - Standard Missile Navy 0 10 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 120 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE 0 106 Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 106 (6) 7 2024 NAVY 30 0 30 7 2025 NAVY 24 0 24 A - 24 O C T LI 2234 - Standard Missile Navy 30 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 121 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 125 1.1.2) FE002 SM-6 Block IA All Up Round Missile 0 2 2024 NAVY 78 0 78 2 2025 NAVY 78 0 78 2 2026 NAVY 55 0 55 2 2027 NAVY 106 0 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 (1) 0 - - - - - - - - - - - - - - - - - - - - - - - - 78 A - - - - - - - - - - - - - - - - - 78 A - - - - - 55 106 (2) 106 106 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 117 0 0 8 8 0 0 (14) 125 0 0 NAVY 125 125 0 2021 NAVY 125 93 32 10 11 11 4 2022 NAVY 125 0 125 - - - 10 10 10 10 11 11 10 10 11 10 11 11 4 2023 NAVY 125 0 125 - - - - - - - - - - - - - - - 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 117 125 0 0 0 10 10 10 10 11 11 10 10 11 32 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 0 5 2019 NAVY 125 125 0 0 5 2020 NAVY 125 125 0 0 5 2021 NAVY 125 125 0 0 5 2022 NAVY 125 125 0 5 2023 NAVY 125 0 125 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) 0 - - - - - - - - - - - 10 10 10 - - - - - A - - - - - 11 11 11 11 11 10 10 10 10 0 (4) 6 2024 NAVY 97 0 97 6 2025 NAVY 78 0 78 6 2026 NAVY 55 0 55 8 8 - 8 - 8 - 8 - 8 - 8 - 8 - 8 - - A O C T LI 2234 - Standard Missile Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R 8 8 9 7 7 7 M A Y J U N 0 7 J U L 7 A U G - 43 55 S E P Volume 1 - 122 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE 0 106 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 106 (6) 7 2024 NAVY 30 0 30 7 2025 NAVY 24 0 24 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y - - - - - - - - - - - - - - - - 30 A - - - - - - - - - - - - - - - - 24 J U N J U L A U G UNCLASSIFIED Page 17 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 123 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 125 1.1.2) FE002 SM-6 Block IA All Up Round Missile 0 0 (1) 2 2024 NAVY 78 0 78 - - - - - - - - - - - - - 2 2025 NAVY 78 0 78 - - - - - - - - - - - - - - - - - - - - - - - - 2 2026 NAVY 55 0 55 - - - - - - - 2 2027 NAVY 106 0 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 6 6 6 6 6 6 7 7 7 7 7 7 78 - - - - - - - - - - - - - - - - - 55 A - - - - - - - - - - - - - - - - - 106 A - - - - - - - - - - - - - - - - - 106 (2) 106 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 117 0 0 8 8 0 0 (14) 125 0 0 NAVY 125 125 0 0 2021 NAVY 125 125 0 0 4 2022 NAVY 125 125 0 4 2023 NAVY 125 93 32 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 117 125 0 10 11 11 0 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 0 5 2019 NAVY 125 125 0 0 5 2020 NAVY 125 125 0 0 5 2021 NAVY 125 125 0 0 5 2022 NAVY 125 125 0 0 5 2023 NAVY 125 125 0 0 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (4) 6 2024 NAVY 97 97 0 6 2025 NAVY 78 35 43 6 2026 NAVY 55 0 55 0 7 O C T LI 2234 - Standard Missile Navy 6 6 N O V 6 D E C 6 J A N 6 F E B 6 M A R 0 A P R 4 M A Y 4 J U N 4 J U L 4 A U G UNCLASSIFIED Page 18 of 24 4 S E P 5 O C T 5 N O V 5 D E C 5 J A N 5 F E B P-1 Line #8 5 M A R 5 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 124 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE 0 106 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y A - - - - - - - - - - - - - - J U N J U L 8 A U G 8 S E P 9 9 9 63 (6) 7 2024 NAVY 30 0 30 - - - - - - - - - - - - - - - - - - - - - - 10 10 10 7 2025 NAVY 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 125 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 125 1.1.2) FE002 SM-6 Block IA All Up Round Missile 0 0 (1) 2 2024 NAVY 78 71 7 2 2025 NAVY 78 0 78 - 2 2026 NAVY 55 0 55 - - - - - - - - - - - - - 2 2027 NAVY 106 0 106 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 0 7 0 6 6 6 6 6 6 7 7 7 7 7 7 0 4 4 4 4 4 5 5 5 5 5 - 5 - - 5 106 (2) 106 8 8 9 81 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 117 0 0 8 8 0 0 (14) 125 0 0 NAVY 125 125 0 0 2021 NAVY 125 125 0 0 4 2022 NAVY 125 125 0 0 4 2023 NAVY 125 125 0 0 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 117 125 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 0 5 2019 NAVY 125 125 0 0 5 2020 NAVY 125 125 0 0 5 2021 NAVY 125 125 0 0 5 2022 NAVY 125 125 0 0 5 2023 NAVY 125 125 0 0 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (4) 6 2024 NAVY 97 97 0 0 6 2025 NAVY 78 78 0 0 6 2026 NAVY 55 55 0 0 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 126 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE 43 63 Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C 9 J A N 9 F E B 9 M A R 9 A P R 9 M A Y 9 J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 9 0 (6) 7 2024 NAVY 30 20 10 10 7 2025 NAVY 24 0 24 O C T LI 2234 - Standard Missile Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L 8 A U G UNCLASSIFIED Page 21 of 24 8 S E P 8 O C T 0 N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 127 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) FE002 SM-6 Block I All Up Round Missile Prior Years Deliveries: 556 1 2017 NAVY 125 125 1.1.2) FE002 SM-6 Block IA All Up Round Missile 0 0 0 (1) 2 2024 NAVY 78 78 0 2 2025 NAVY 78 78 0 2 2026 NAVY 55 50 5 2 2027 NAVY 106 0 106 1.1.4) FE002 SM-6 Dual Thrust Rocket Motor/Booster 3 2027 NAVY 106 (12) 25 0 5 0 - 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 0 (2) 81 9 0 1.1.5) FE002 SM-6 Block I/IA All Up Round Missile ✓ (13) 117 0 0 8 8 0 0 (14) 125 0 0 NAVY 125 125 0 0 2021 NAVY 125 125 0 0 4 2022 NAVY 125 125 0 0 4 2023 NAVY 125 125 0 0 4 2018 NAVY 4 2018 NAVY 4 2019 NAVY 4 2020 4 117 125 1.1.7) FE002 Canister - SM-6 Block I/IA (Mk 21 Mod 3/Mod 4) Prior Years Deliveries: 556 ✓ 5 2017 NAVY 125 125 0 0 5 2018 NAVY 117 117 0 0 5 2018 NAVY 8 8 0 0 5 2019 NAVY 125 125 0 0 5 2020 NAVY 125 125 0 0 5 2021 NAVY 125 125 0 0 5 2022 NAVY 125 125 0 0 5 2023 NAVY 125 125 0 0 1.1.10) FE002 Canister - SM-6 Block IA (Mk 21 Mod 4) (4) 6 2024 NAVY 97 97 0 0 6 2025 NAVY 78 78 0 0 6 2026 NAVY 55 55 0 0 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 128 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 6 2027 NAVY PROC QTY Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT 106 1.1.12) FE00079 Israel Supplemental Item Number / Title [DODIC]: 1 / STANDARD MISSILE Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 106 0 0 0 (6) 7 2024 NAVY 30 30 0 7 2025 NAVY 24 24 0 0 O C T LI 2234 - Standard Missile Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 129 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / STANDARD MISSILE Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 3 3 23 26 3 3 24 27 2 Raytheon CO - Tucson, AZ 125 125 239 3 3 37 40 3 3 37 40 3 Aerojet - Camden AR 87 87 436 3 3 33 36 3 3 33 36 1 Raytheon CO - Tucson AZ MAX For 2027 ALT Prior to Oct 1 TBD 4 Raytheon CO - Tucson AZ TBD 3 3 23 26 3 3 34 37 5 BAE - MINNEAPOLIS, MN TBD 3 8 14 22 3 8 14 22 6 BAE - MINNEAPOLIS, MN 125 125 436 3 8 14 22 3 8 14 22 7 Raytheon CO - Tucson AZ 125 125 151 3 3 37 40 3 3 37 40 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (12) (13) (14) DTRM and Booster will be delivered at least 90 days prior to SM-6 BLK IAUs deliveries. All deliveries reflect contractual delivery dates, FY17/18 P0016 All deliveries reflect contractual delivery dates, MYP P00000 (Basic). 4 Month gap in delivery due to delayed MYP contract award. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 24 of 24 P-1 Line #8 Volume 1 - 130 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles P-1 Line Item Number / Title: 2234 / Standard Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 451.461 107.830 - - - - - - - - - 559.291 Net Procurement (P-1) ($ in Millions) 451.461 107.830 - - - - - - - - - 559.291 Total Obligation Authority ($ in Millions) 451.461 107.830 - - - - - - - - - 559.291 Description: The SM-6 provides an extended range engagement capability to provide the air superiority and the umbrella of protection for joint U.S. forces and allies against the full spectrum of manned-fixed and rotarywinged aircraft, unmanned aerial vehicles, and land attack and anti-ship cruise missiles in flight. This capability contributes significantly to the continuous protection of forward deployed ground maneuver forces as well as theater rear assets. The SM-6 is the primary extended range air defense weapon for AEGIS cruisers and destroyers and potentially future combatants. FY 2024 is the first year of a base plus option procurement. Advanced procurement includes the acquisition of long lead items or economic order quantities (EOQ) of items (advanced EOQ acquisition). Advance material may include materials, parts, components, and effort that must be funded in advance to maintain a planned production schedule. Economic Order Quantity for advance procurement funds for FY 2024 and FY 2025 are reflected in the budget. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 1 of 4 P-1 Line #9 Volume 1 - 131 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles P-1 Line Item Number / Title: 2234 / Standard Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / STANDARD MISSILE 1,528 / 451.461 102 / 107.830 55 / - 106 / - - / - 106 / - P-40 Total Gross/Weapon System Cost 1,528 / 451.461 102 / 107.830 55 / - 106 / - - / - 106 / - *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The budget reflects a funding profile for a base plus one option year beginning FY 2024 for the SM-6 BLK IA AUR procurement. The use of Advanced Procurement provides Economic Order Quantity (EOQ) to reduce the cost of subcontractor effort, material, and components enabling greater production efficiencies and substantial cost savings. EOQ will fund the procurement of MK72 Booster, MK104 Dual Thrust Rocket Motors (DTRM) and Guidance Sections. Booster is a 33-month lead time due to the unique steel for the case and additional time for mating with a Thrust Vector Actuator (TVA). The DTRM has a 33month lead time due to the specialty steel required for manufacturing. The guidance section takes 36 months to deliver due to the lead time in the specialty Circuit Card Assemblies. Full funding for every end item requesting advance procurement is included in the budget submission. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 2 of 4 P-1 Line #9 Volume 1 - 132 === page 173 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2234 / Standard Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 First System (2027) Award Date: January 2013 First System (2027) Completion Date: January 2013 Production Leadtime STANDARD MISSILE P-5 Number / Title: 1 / STANDARD MISSILE Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) 1,528 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 102 FY 2025 ($ M) FY 2027 (Each) (Each) 55 FY 2026 ($ M) 106 FY 2027 ($ M) ($ M) CFE FY 2020 EOQ 0 83.789 - - - FY 2021 EOQ 0 83.623 - - - FY 2022 EOQ 0 83.509 - - - FY 2023 EOQ 0 82.920 - - - 0 41.167 - - - 0 30.581 - - - MK72 Booster (1) (†) MK104 Dual Thrust Rocket Motor(DTRM) (2) (†) (3) (†) 45.872 107.830 - - Total: CFE 451.461 107.830 - 0.000 Total Advance Procurement/Obligation Authority 451.461 107.830 - - Guidance Section (GS) Parts LI 2234 - Standard Missile Navy 0 UNCLASSIFIED Page 3 of 4 P-1 Line #9 Volume 1 - 133 === page 174 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2234 / Standard Missile Date: April 2026 P-5 Number / Title: 1 / STANDARD MISSILE FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE FY 2020 EOQ 0 - FY 2021 EOQ 0 - FY 2022 EOQ 0 - FY 2023 EOQ 0 - 1 - 1 - MK72 Booster (1) (†) MK104 Dual Thrust Rocket Motor(DTRM) Guidance Section (GS) Parts (2) (†) (3) (†) 1 - Total: CFE 0.000 Total Advance Procurement/Obligation Authority - Description: This multiyear contract uses Economic Order Quantity Advance Procurement funding to provide the U.S. Government maximum savings in price. Advance Procurement funding will enable material and component suppliers and subcontractors with sufficient lead time to support the planned delivery schedule within the context of the multiyear funding, prices, and cancellation ceilings. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (1) We are using the FY24 AP to bundle the FY24/25 quantities of the long lead items to buy down the anticipated cost of the AUR and to maintain a smooth delivery schedule. The use of FY24 AP for FY25 LLM requirements allows us to bundle for the greater quantities, ultimately lending to cost and schedule avoidance. (2) We are using the FY24 AP to bundle the FY24/25 quantities of the long lead items to buy down the anticipated cost of the AUR and to maintain a smooth delivery schedule. The use of FY24 AP for FY25 LLM requirements allows us to bundle for the greater quantities, ultimately lending to cost and schedule avoidance. (3) We are using the FY24 AP to bundle the FY24/25 quantities of the long lead items to buy down the anticipated cost of the AUR and to maintain a smooth delivery schedule. The use of FY24 AP for FY25 LLM requirements allows us to bundle for the greater quantities, ultimately lending to cost and schedule avoidance. LI 2234 - Standard Missile Navy UNCLASSIFIED Page 4 of 4 P-1 Line #9 Volume 1 - 134 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204162N Other Related Program Elements: 0604329N Line Item MDAP/MAIS Code: 439 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 2,319 262 245 512 - 512 330 338 334 342 2,818 7,500 474.915 79.283 78.892 166.688 166.688 110.840 112.426 113.780 115.543 716.087 1,968.454 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 474.915 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 474.915 - - 79.283 78.892 - - 79.283 78.892 - 0.000 - 166.688 - - 0.000 166.688 - 166.688 - 0.000 166.688 110.840 110.840 112.426 112.426 113.780 113.780 To FY 2031 Complete 115.543 - - 716.087 115.543 Total 1,968.454 - - 716.087 1,968.454 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - 2.313 1.531 1.900 - 1.900 1.590 1.341 1.289 2.366 Continuing 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 204,793.01 302,606.87 322,008.16 325,562.50 - 325,562.50 335,878.79 332,621.30 340,658.68 337,845.03 Continuing - 254,111.78 0.00 262,460.53 Description: Small Diameter Bomb Increment II (SDB II) is an ACAT 1C program providing the warfighter a capability to attack mobile targets in all weather. The U.S. Air Force (USAF) is the lead service. The SDB II increases joint lethality in contested environments. The SDB II can strike a diverse set of targets inside an adversary's air and missile defense networks to destroy mobile platforms through the weather. With increased loadout, range, and munitions effect the network enabled SDB II enhances close combat lethality in complex terrain. Threshold aircraft are the F-15E for the USAF, and for the Department of Navy (DON) F-35B and F-35C. Objective aircraft include the F/A-22, B-1, B2, F-117, F-16, B-52, Predator B, F/A-18 E/F. Milestone C was achieved June 2015. The Acquisition Decision Memorandum was signed 17 Feb 2026. Lots 1 through 3 are Air Force only procurements; Lot 1 awarded 12 June 2015. SDB II will be integrated on F-35B and F-35C using BRU-61, and on F/A-18 E/F using BRU-55. The F/A-18 E/F Initial Operational Capability (IOC) achieved 8 Jan 2026; F-35 IOC is planned for FY2027. The total planned SDB II procurement is 29,110 weapons; 21,610 for the AF and 7,500 for the DON. Funds may be used to resolve production DMS/MS/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement and qualification activities to preserve future production capabilities and capacities. LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 1 of 12 P-1 Line #10 Volume 1 - 135 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204162N Other Related Program Elements: 0604329N Line Item MDAP/MAIS Code: 439 Exhibits Schedule Exhibit Type Title* P-5 1 / Small Diameter Bomb II (SDB II) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 2,319 / 474.915 262 / 79.283 245 / 78.892 512 / 166.688 - / 0.000 512 / 166.688 2,319 / 474.915 262 / 79.283 245 / 78.892 512 / 166.688 - / 0.000 512 / 166.688 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding continues procurement of SDB II All Up Rounds (AUR) to support warfighter requirements as well as Containers, Test Vehicles, Production support, Production Test Support, and Obsolescence. Increase in USN procurement from FY 2026 to FY 2027 supports inventory objectives and to maintains the minimum sustainment rate, when combined with FMS and USAF, with USAF QTYs decreasing from FY 2026 to FY207. LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 2 of 12 P-1 Line #10 Volume 1 - 136 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 245 512 474.915 79.283 78.892 166.688 474.915 Plus CY Advance Procurement ($ in Millions) - - 79.283 78.892 - Total Obligation Authority ($ in Millions) FY 2027 OOC 262 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 2,319 474.915 - - 79.283 78.892 FY 2027 Total - 512 0.000 - 166.688 - 166.688 - 0.000 - 166.688 - 166.688 0.000 166.688 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) 204,793.01 2.313 1.531 1.900 - 1.900 302,606.87 322,008.16 325,562.50 - 325,562.50 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost 2,319 398.374 230,728.00 - - 4.625 - - - Unit Cost Cost Elements FY 2025 Total Cost ($) Qty (Each) ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) All Up Round (†) (1) (AUR) 171,786.98 1.1.2) Weapon Containers (2) 1.1.3) TIK/Test Vehicle (3) Subtotal: Recurring Cost Subtotal: Hardware Cost 262 60.451 - - 2.655 6.952 - - - 409.951 - - 409.951 - - - 8.081 264,622.71 245 64.833 - - 2.355 3.977 - - - 67.083 - - 67.083 - - - - 274,000.00 512 140.288 - - - - - 4.961 - - - 3.953 - - 8.344 - - - 71.141 - - 153.593 - - 71.141 - - 153.593 - - - - - - - 274,000.00 512 140.288 - - 4.961 - - - 8.344 - - - - 153.593 - - - - 153.593 - - - - - - Hardware - Nonrecurring and Ancillary Equip Cost Non Recurring Cost 2.1.1) Containers 2.1.2) Obsolescence - - 11.915 - - 5.041 - - 1.647 - - 6.350 - - - - - 6.350 Subtotal: Non Recurring Cost - - 19.996 - - 5.041 - - 1.647 - - 6.350 - - - - - 6.350 Subtotal: Hardware Nonrecurring and Ancillary Equip Cost - - 19.996 - - 5.041 - - 1.647 - - 6.350 - - - - - 6.350 - - 2.010 - - 1.117 - - - - - - - - - - - - (4) Support - Production Support Cost 3.1) Logistics Support (5) LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 3 of 12 P-1 Line #10 Volume 1 - 137 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.2) Production Testing Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 9.242 - - 5.399 - - 4.849 - - 4.946 - - - - - 4.946 (7) - - 4.177 - - 0.643 - - 1.255 - - 1.799 - - - - - 1.799 3.4) Prior Year - - 23.903 - - - - - - - - - - - - - - - - - 39.332 - - 7.159 - - 6.104 - - 6.745 - - - - - 6.745 - - 5.636 - - - - - - - - - - - - - - - - - 5.636 - - - - - - - - - - - - - - - 2,319 474.915 262 79.283 245 78.892 - - 0.000 (6) 3.3) Production Support Subtotal: Support Production Support Cost Support - Fleet Support Cost 4.1) Prior Year Subtotal: Support - Fleet Support Cost Gross/Weapon System Cost (†) 204,793.01 302,606.87 322,008.16 325,562.50 512 166.688 325,562.50 512 166.688 indicates the presence of a P-5a Footnotes: (1) All Up Round: AURs procured in FY 2026 and out will possess the new M-Code Global Positioning System (GPS) receiver. The M-Code receiver will provide protection from cybersecurity risks and intentional GPS jamming and spoofing. FY 2026 and out unit costs are from the USAF Program Office Estimate. Unit price increased due to the end of a six year Company Funds Request (CFR) pricing deal through Lot 11 (FY 2025). Material cost increases will be realized starting with the Lot 12 (FY 2026) award. Increase in FY 2027 to support inventory objectives and to maintain the minimum sustainment rate when combined with FMS and USAF as a result of a decrease in the USAF quantities. (2) (3) Weapon Containers: The Department of the Navy is buying two-place containers. One container is required for every two SDB II weapons. Telemetry Instrumentation Kits (TIKs), including Flight Telemetry, Termination, and Tracking systems (FTTTs) are required for annual Fleet training using Non-Combat Expenditure Allowance (NCEA) assets. As the SDB II weapon is fielded on more squadrons, those additional squadrons will need to be trained, and they will not share or re-use kits. Increase in FY 2027 is to account for additional test assets required to support the new weapon configuration. (4) Obsolescence funding in support of DMSMS activities to include bridge buys, life-of-type buys, supplier/parts replacement, and re-qualification. Replace and integrate the obsolete seeker components and associated electronics to maintain the SDB II production line. The new seeker design will require ground and flight qualification, updated test equipment, updated computer integrated labs, and production readiness activities. FY2027 increase is to support upcoming FY2027 life-of-type buys. (5) SDB II utilizes Interim Contractor Support (ICS) strategy to sustain SDB II systems prior to Material Support Date (MSD) in accordance with Financial Management Regulations. ICS is funded within procurement appropriation prior to MSD (April 2023). ICS includes logistics support for existing and newly procured SDB II systems and funds prime contractor logistics support, field service representative, repairables, and mobile training teams. Logistics support costs transition to OM&N funding commencing in FY2026 and out. (6) Production Testing includes Lot Integration and test (LIT) support at the Prime Contractor production facility. This includes additional tooling and test equipment to eliminate single point failure, provide reverse flow test capability, and additional capacity. Among those items are the Aft Test Set, StormBreaker Smart Weapon In-Process Gimbal Station (SWIGS) Test Position (TP), Seeker Multi-Function Bench (MFB), Seeker Reverse Flow Station, Munition Test Set (MTS), Flight Telemetry, Termination and Tracking (FTTT) Thermal Station, FTTT Vibe Test Station. In addition, there are factory software updates required to existing tooling and test equipment that will be covered in this cost element. Obsolescence of current tooling and test equipment is also being addressed. LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 4 of 12 P-1 Line #10 Volume 1 - 138 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) MDAP/MAIS Code: (7) Production support is government labor in support of the production of the All Up Round. Increase above the standard inflation rate in FY 2027 is to account for additional support required for the increase in quantities being procured. LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 5 of 12 P-1 Line #10 Volume 1 - 139 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements (†) 1.1.1) All Up Round (AUR) (†) 1.1.1) All Up Round (AUR) (†) 1.1.1) All Up Round (AUR) (†) 1.1.1) All Up Round (AUR) (†) 1.1.1) All Up Round (AUR) (†) FY 2023 (8) 2024 (10) 2025 (11) 2026 (12) 2027 (13) Contractor and Location P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Raytheon CO (9) / Tucson AZ C / CPIF Eglin AFB, FL Mar 2023 Nov 2025 396 223,409.09 Y May 2022 Raytheon CO (9) / Tucson AZ C / FPIF Eglin AFB, FL Dec 2023 Nov 2026 232 210,741.00 Y May 2022 Raytheon CO (9) / Tucson AZ C / FPIF Eglin AFB, FL Dec 2024 Nov 2027 262 230,728.00 Y May 2023 Raytheon CO (9) / Tucson AZ C / FPIF Eglin AFB, FL Apr 2026 Nov 2028 245 264,622.71 Y Aug 2024 Raytheon CO (9) / Tucson AZ C / FPIF Eglin AFB, FL Mar 2027 Nov 2029 512 274,000.00 Y Aug 2025 indicates the presence of a P-21 Footnotes: (8) Raytheon Missiles and Defense, Tucson, AZ is the prime contractor for this effort. FY 2023 is Lot 9; Lots 1-3 are Air Force only procurements. Qty of 18 AURs were procured on Lot10 contract (Dec 23 award) to meet min qty required for award (250). (9) Production lead time has increased due to longer supplier base lead times. (10) (11) (12) (13) Raytheon Missiles and Defense, Tucson, AZ is the prime contractor for this effort. FY 2024 is Lot 10 Raytheon Missiles and Defense, Tucson, AZ is the prime contractor for this effort. FY 2025 is Lot 11 Raytheon Missiles and Defense, Tucson, AZ is the prime contractor for this effort. FY 2026 is Lot 12 Raytheon Missiles and Defense, Tucson, AZ is the prime contractor for this effort. FY 2027 is Lot 13 LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 6 of 12 P-1 Line #10 Volume 1 - 140 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) All Up Round (AUR) Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1691 (14) 0 396 A - - - - - - - - - - - - - - - - - - - 396 (‡) 1,122 0 1,122 A - - - - - - - - - - - - - - - - - - - 1,122 2023 Total 1,518 0 1,518 - - - - - - - - - - - - - - - - - - - 1,518 2024 NAVY 232 0 232 A - - - - - - - - - - 232 1 2024 AF (‡) 1,250 0 1,250 A - - - - - - - - - - 1,250 1 2024 Total 1,482 0 1,482 - - - - - - - - - - 1,482 1 2025 NAVY 262 0 262 1 2025 AF (‡) 867 0 867 867 1 2025 Total 1,129 0 1,129 1,129 1 2026 NAVY 245 0 245 245 1 2026 AF (‡) 806 0 806 806 1 2026 Total 1,051 0 1,051 1,051 1 2027 NAVY 512 0 512 512 1 2027 AF (‡) 373 0 373 373 1 2027 Total 885 0 885 1 2023 NAVY 1 2023 AF 1 1 396 262 885 O C T LI 2238 - Small Diameter Bomb II (SDB II) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 141 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) All Up Round (AUR) Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1691 (14) 0 396 - - - - - - - - - - - - - 30 30 30 32 32 32 32 32 32 38 38 (‡) 1,122 0 1,122 - - - - - - - - - - - - - 93 93 93 93 93 93 94 94 94 94 94 94 2023 Total 1,518 0 1,518 - - - - - - - - - - - - - 123 123 123 125 125 125 126 126 126 132 132 132 1 2024 NAVY 232 0 232 - - - - - - - - - - - - - - - - - - - - - - - - 232 1 2024 AF (‡) 1,250 0 1,250 - - - - - - - - - - - - - - - - - - - - - - - - 1,250 1 2024 Total 1,482 0 1,482 - - - - - - - - - - - - - - - - - - - - - - - - 1,482 1 2025 NAVY 262 0 262 A - - - - - - - - - - - - - - - - - - - - - - 262 1 2025 AF (‡) 867 0 867 A - - - - - - - - - - - - - - - - - - - - - - 867 1 2025 Total 1,129 0 1,129 - - - - - - - - - - - - - - - - - - - - - - 1,129 1 2026 NAVY 245 0 245 A - - - - - - 245 1 2026 AF (‡) 806 0 806 A - - - - - - 806 1 2026 Total 1,051 0 1,051 - - - - - - 1,051 1 2027 NAVY 512 0 512 512 1 2027 AF (‡) 373 0 373 373 1 2027 Total 885 0 885 1 2023 NAVY 1 2023 AF 1 396 38 885 O C T LI 2238 - Small Diameter Bomb II (SDB II) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 142 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) All Up Round (AUR) Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1691 (14) 358 38 38 (‡) 1,122 1,028 94 94 2023 Total 1,518 1,386 132 132 - - - - - - - - - - - - 1 2024 NAVY 232 0 232 - 22 22 22 22 22 22 22 22 20 12 12 12 1 2024 AF (‡) 1,250 0 1,250 - 104 104 104 104 104 104 104 104 104 104 104 106 1 2024 Total 1,482 0 1,482 - 126 126 126 126 126 126 126 126 124 116 116 118 - - - - - - - - - - - 0 1 2025 NAVY 262 0 262 - - - - - - - - - - - - - 22 22 22 22 22 22 22 22 22 22 21 21 1 2025 AF (‡) 867 0 867 - - - - - - - - - - - - - 70 73 73 73 73 73 73 73 73 73 73 67 1 2025 Total 1,129 0 1,129 - - - - - - - - - - - - - 92 95 95 95 95 95 95 95 95 95 94 88 1 2026 NAVY 245 0 245 - - - - - - - - - - - - - - - - - - - - - - - - 245 1 2026 AF (‡) 806 0 806 - - - - - - - - - - - - - - - - - - - - - - - - 806 1 2026 Total 1,051 0 1,051 - - - - - - - - - - - - - - - - - - - - - - - - 1,051 1 2027 NAVY 512 0 512 A - - - - - - - - - - - - - - - - - - - 512 1 2027 AF (‡) 373 0 373 A - - - - - - - - - - - - - - - - - - - 373 1 2027 Total 885 0 885 - - - - - - - - - - - - - - - - - - - 885 1 2023 NAVY 1 2023 AF 1 396 O C T LI 2238 - Small Diameter Bomb II (SDB II) Navy 0 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 143 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) All Up Round (AUR) Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1691 (14) 396 0 (‡) 1,122 1,122 0 2023 Total 1,518 1,518 0 1 2024 NAVY 232 232 0 1 2024 AF (‡) 1,250 1,250 0 1 2024 Total 1,482 1,482 0 - 1 2025 NAVY 262 241 21 21 1 2025 AF (‡) 867 800 67 67 1 2025 Total 1,129 1,041 88 88 - - - - - - - - - - - - 1 2026 NAVY 245 0 245 - 20 20 20 20 20 20 20 20 20 20 20 25 1 2026 AF (‡) 806 0 806 - 67 67 67 67 67 67 67 67 67 67 67 69 1 2026 Total 1,051 0 1,051 - 87 87 87 87 87 87 87 87 87 87 87 94 - - - - - - - - - - - 0 1 2027 NAVY 512 0 512 - - - - - - - - - - - - - 42 42 42 42 43 43 43 43 43 43 43 43 1 2027 AF (‡) 373 0 373 - - - - - - - - - - - - - 31 31 31 31 31 31 31 31 31 31 31 32 1 2027 Total 885 0 885 - - - - - - - - - - - - - 73 73 73 73 74 74 74 74 74 74 74 75 1 2023 NAVY 1 2023 AF 1 396 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T LI 2238 - Small Diameter Bomb II (SDB II) Navy - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 12 S E P O C T - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 144 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) All Up Round (AUR) Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1691 (14) 396 0 (‡) 1,122 1,122 0 2023 Total 1,518 1,518 0 1 2024 NAVY 232 232 0 1 2024 AF (‡) 1,250 1,250 0 1 2024 Total 1,482 1,482 0 1 2025 NAVY 262 262 0 1 2025 AF (‡) 867 867 0 1 2025 Total 1,129 1,129 0 1 2026 NAVY 245 245 0 1 2026 AF (‡) 806 806 0 1 2026 Total 1,051 1,051 0 - 1 2027 NAVY 512 469 43 43 1 2027 AF (‡) 373 341 32 32 1 2027 Total 885 810 75 75 1 2023 NAVY 1 2023 AF 1 396 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T LI 2238 - Small Diameter Bomb II (SDB II) Navy - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 0 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2238 / Small Diameter Bomb II (SDB II) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Small Diameter Bomb II (SDB II) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Raytheon CO (9) - Tucson AZ MSR For 2027 1-8-5 For 2027 MAX For 2027 1,140 1,925 2,100 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 6 26 Total After Oct 1 ALT Prior to Oct 1 32 ALT After Oct 1 0 Manufacturing PLT 6 Total After Oct 1 28 34 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (9) Production lead time has increased due to longer supplier base lead times. (14) Qty of 18 AURs were procured on Lot10 contract (Dec 23 award) to meet min qty required for award (250) LI 2238 - Small Diameter Bomb II (SDB II) Navy UNCLASSIFIED Page 12 of 12 P-1 Line #10 Volume 1 - 146 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 2,483 148 123 116 - 116 134 137 137 137 Continuing 1,958.189 145.268 122.372 119.166 119.166 133.943 141.519 144.175 147.097 Continuing Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,958.189 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,958.189 145.268 145.268 122.372 122.372 - 0.000 - 119.166 - 0.000 - 119.166 0.000 119.166 119.166 133.943 133.943 141.519 141.519 144.175 144.175 To FY 2031 Complete 147.097 Continuing - Continuing 147.097 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - 788,638.34 981,540.54 994,894.31 1,027K - 1,027K 999,574.63 1,033K 1,052K 1,074K Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) Continuing Continuing Description: Rolling Airframe Missile (RAM) is a high firepower missile system used to defeat Anti-Ship Missiles (ASMs), as well as other airborne threats. RAM is a surface-to-air missile with passive dual-mode radio frequency/infrared (RF/IR) guidance and an active-optical proximity and contact fuse. RAM has minimal shipboard control systems and is autonomous after launch. The RAM Block 1 incorporated "all-the-wayhoming" to improve performance against evolving passive and active ASMs. The RAM Block 2 provides increased kinematic capability against highly maneuvering threats and improved RF detection against low probability of intercept threats. The RAM missile is fired from a RAM Guided Missile Launching System (GMLS) (MK-49), which holds 21 RAM rounds. RAM is also fired from the Close-In Weapon System (CIWS) SeaRAM Anti-Ship Missile Defense System (MK-15 MOD 31-33) which holds 11 rounds. The FY 2026 spend plan for Rolling Airframe Missile (RAM) included $122,372 thousand of discretionary and $18,000 thousand of mandatory funding for a total of $140,372 thousand. The mandatory funds enable the procurement of test equipment to establish a domestic seeker head production line for RAM BLK2B. Cooperative Agreement: RAM is a cooperative program with the Federal Republic of Germany. The U.S. and Federal Republic of Germany cooperatively produce Block 2 missiles, launchers, and Ordnance Alterations (ORDALTs). The Block 2 production Memorandum of Understanding (MOU) was signed on 19 March 2013. Amendment 3 to the Block 2 Memorandum of Understanding (MOU) was signed June 2025. LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 1 of 14 P-1 Line #11 Volume 1 - 147 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Rolling Airframe Missile (RAM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 2,483 / 1,958.189 148 / 145.268 123 / 122.372 116 / 119.166 - / 0.000 116 / 119.166 2,483 / 1,958.189 148 / 145.268 123 / 122.372 116 / 119.166 - / 0.000 116 / 119.166 P-5a, P-21 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In FY 2027, the program plans to procure 116 RAM missiles, 70 Block 2 to 2A ORDALTs. LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 2 of 14 P-1 Line #11 Volume 1 - 148 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 123 116 1,958.189 145.268 122.372 119.166 - 1,958.189 Plus CY Advance Procurement ($ in Millions) - 145.268 - Total Obligation Authority ($ in Millions) FY 2027 OOC 148 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 2,483 - 1,958.189 - 0.000 - 122.372 119.166 - 119.166 - 145.268 116 0.000 - 122.372 FY 2027 Total - 119.166 - 119.166 - 0.000 119.166 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) - 788,638.34 - 981,540.54 994,894.31 - - - 1,027K - 1,027K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - EF001 Block 1 Missile Cost Recurring Cost 1.1.1) EF001 G&C 406,217.21 1,197 486.242 - - - - - - - - - - - - - - - 1.1.2) EF001 Propulsion 14,114.29 140 1.976 - - - - - - - - - - - - - - - 1.1.3) EF001 Safe and Arm Device 3,407.14 140 0.477 - - - - - - - - - - - - - - - 1.1.4) EF001 Ordance Pack 26,600.00 140 3.724 - - - - - - - - - - - - - - - 1.1.5) EF001 Warhead 11,221.43 140 1.571 - - - - - - - - - - - - - - - 1.1.6) EF001 Canisters 46,371.43 140 6.492 - - - - - - - - - - - - - - - 1.1.7) EF001 Block 1 GMRP ORDALTs 216,706.67 450 97.518 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 598.000 - - - - - - - - - - - - - - - Subtotal: Hardware - EF001 Block 1 Missile Cost - - 598.000 - - - - - - - - - - - - - - - - - 12.364 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 12.364 - - - - - - - - - - - - - - - Subtotal: Hardware - EF002 Propulsion Cost - - 12.364 - - - - - - - - - - - - - - - Hardware - EF002 Propulsion Cost Recurring Cost 2.1.1) EF002 Propulsion Hardware - EF004 Safe and Arm Cost LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 3 of 14 P-1 Line #11 Volume 1 - 149 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Recurring Cost 3.1.1) EF004 Safe & Arm Device - - 2.103 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 2.103 - - - - - - - - - - - - - - - Subtotal: Hardware - EF004 Safe and Arm Cost - - 2.103 - - - - - - - - - - - - - - - 4.1.1) EF005 Ordnance Pack - - 28.251 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 28.251 - - - - - - - - - - - - - - - Subtotal: Hardware - EF005 Ordnance Pack Cost - - 28.251 - - - - - - - - - - - - - - - Hardware - EF005 Ordnance Pack Cost Recurring Cost Hardware - EF006 Warhead Cost Recurring Cost 5.1.1) EF006 Warhead - - 7.174 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 7.174 - - - - - - - - - - - - - - - Subtotal: Hardware - EF006 Warhead Cost - - 7.174 - - - - - - - - - - - - - - - Hardware - EF007 Canister Cost Recurring Cost 6.1.1) EF007 Canister - - 32.031 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 32.031 - - - - - - - - - - - - - - - Subtotal: Hardware - EF007 Canister Cost - - 32.031 - - - - - - - - - - - - - - - 557,187.40 1,286 716.543 599,090.70 148 88.665 612,544.72 123 75.343 628,496.00 116 72.906 - - - 628,496.00 116 72.906 76,999.22 1,286 99.021 84,268.12 148 12.472 86,040.00 123 10.583 91,629.31 116 10.629 - - - 91,629.31 116 10.629 7,938.33 1,281 10.169 6,782.65 148 1.004 6,926.00 123 0.852 7,862.07 116 0.912 - - - 7,862.07 116 0.912 50,826.87 1,161 59.010 53,626.67 148 7.937 54,755.00 123 6.735 55,904.00 116 6.485 - - - 55,904.00 116 6.485 23,362.93 1,025 23.947 25,317.52 148 3.747 25,849.00 123 3.179 28,086.21 116 3.258 - - - 28,086.21 116 3.258 Hardware - EF008 Block 2 Missile Cost Recurring Cost (†) 7.1.1) EF008 G&C 7.1.2) EF008 Propulsion (†) 7.1.3) EF008 Safe and Arm Device (†) 7.1.4) EF008 (†) Ordnance Pack 7.1.5) EF008 (†) Warhead LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 4 of 14 P-1 Line #11 Volume 1 - 150 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 7.1.6) EF008 Canister (†) Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) 60,409.32 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) 148 8.941 - - 61,681.00 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) 54,460.34 1,286 70.036 123 7.587 - - 64,698.28 599,467.74 62 37.167 - - - 655,073.60 4 2.620 668,800.00 5 3.344 682,788.90 - - - 44,971.43 70 3.148 45,916.00 70 3.214 46,880.00 97 3.164 - - - - - - - 0.015 - - - - - 2.258 - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) 64,698.28 Total Cost Qty (Each) ($ M) 116 7.505 - - - 116 7.505 - - - - - - - 5 3.414 - - - 682,788.90 5 3.414 70 3.282 - - - 46,880.00 70 3.282 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7.1.7) EF008 BLK 2 (†) GMRP ORDALTS (1) 7.1.8) EF008 BLK 1 to BLK 2B GMRP (†) (2) ORDALTS 7.1.9) EF008 BLK 2 to BLK 2A GMRP (†) (3) ORDALTS 7.1.10) EF008 Telemeters 32,618.56 7.1.11) EF008 Transportation - 7.1.12) EF008 BLK 2B HUM 2,258K 1 - - - - Subtotal: Recurring Cost - - 1,021.330 - - 128.534 - - 110.837 - - 108.391 - - - - - 108.391 Subtotal: Hardware - EF008 Block 2 Missile Cost - - 1,021.330 - - 128.534 - - 110.837 - - 108.391 - - - - - 108.391 51 0.707 43 0.636 42 0.634 - - - 42 0.634 Hardware - EF957 Containers Cost Recurring Cost 8.1.1) EF957 Container (†) (4) 10,223.66 617 6.308 13,862.75 14,789.47 15,105.26 15,105.26 Subtotal: Recurring Cost - - 6.308 - - 0.707 - - 0.636 - - 0.634 - - - - - 0.634 Subtotal: Hardware - EF957 Containers Cost - - 6.308 - - 0.707 - - 0.636 - - 0.634 - - - - - 0.634 Support - EF850 Component Improvement/DMS Cost 9.1) EF850 Component Improvement - - 80.467 - - 3.833 - - 1.980 - - 2.022 - - - - - 2.022 9.2) EF850 Diminishing Manufacturing Sources - - 30.064 - - 4.877 - - 2.937 - - 2.999 - - - - - 2.999 Subtotal: Support - EF850 Component Improvement/ DMS Cost - - 110.531 - - 8.710 - - 4.917 - - 5.021 - - - - - 5.021 - 59.227 - - 1.694 - - 1.376 - - 0.415 - - - - - 0.415 Support - EF830 Production Support Cost 10.1) EF830 Production Support Contractor Engineering - LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 5 of 14 P-1 Line #11 Volume 1 - 151 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 10.2) EF830 Production Support Gov In-House Engineering - - 60.280 - - 3.212 - - 3.278 - - 3.348 - - - - - 3.348 Subtotal: Support - EF830 Production Support Cost - - 119.507 - - 4.906 - - 4.654 - - 3.763 - - - - - 3.763 Support - EF860 Product Acceptance Cost 11.1) EF860 Product Acceptance - - 8.315 - - 0.524 - - 0.535 - - 0.547 - - - - - 0.547 Subtotal: Support - EF860 Product Acceptance Cost - - 8.315 - - 0.524 - - 0.535 - - 0.547 - - - - - 0.547 Support - EF950 Tool & Test Equipment Cost 12.1) EF950 Tool & Test Equipment - - 1.205 - - 1.110 - - - - - - - - - - - - Subtotal: Support - EF950 Tool & Test Equipment Cost - - 1.205 - - 1.110 - - - - - - - - - - - - 13.1) EF974 ILS - - 10.723 - - 0.777 - - 0.793 - - 0.810 - - - - - 0.810 13.2) WAXXX Acquisition Workforce Fund 2009 - - 0.347 - - - - - - - - - - - - - - - - - 11.070 - - 0.777 - - 0.793 - - 0.810 - - - - - 0.810 148 145.268 123 122.372 1,027K 116 119.166 - - 0.000 1,027K 116 119.166 Support - EF974 ILS Cost Subtotal: Support - EF974 ILS Cost Gross/Weapon System Cost 788,638.34 2,483 1,958.189 981,540.54 994,894.31 Remarks: [Hardware] Containers - Procures containers for transporting the GMRP and GMRP ORDALTS. [Support Cost] Component Improvement/DMS - Provides RAM Design Agent engineering and technical support for component replacement and improvement. The RAM Guided Missile Round Pack (GMRP) is a build to print missile that includes commercial-off-the-shelf hardware. Support includes the development/review/approval/verification of production engineering change proposals and obsolescence mitigation efforts. This support is required to ensure that the build to print package continues to support the system performance specs as production matures. Funding also supports procurement of key components via Life of Type buys. [Support Cost] Production Support - Production support is an annual requirement which supports all on-going production. Provides contractor and government in-house critical engineering and technical support of the production line and production test equipment. Efforts include the technical investigation and resolution of production issues, control and maintenance of the technical data package, resolution of test equipment issues, configuration management, reliability assessments, and safety. Production support is an annual requirement which supports all on-going production. [Support Cost] Product Acceptance - Funds field activity product acceptance efforts. [Support Cost] ILS - Funds Integrated Logistics Support (ILS) efforts in support of production. LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 6 of 14 P-1 Line #11 Volume 1 - 152 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) Block 2 GMRP ORDALTs utilize common components from decommissioned Block 1 missiles. Deliveries have the same capabilities as new build Block 2 GMRPs. ORDALTs are bought to budget. Block 1 to Block 2B GMRP ORDALTs utilize common components from decommissioned Block 1 missiles. Deliveries have the same capabilities as new build Block 2B GMRPs. Block 2 to Block 2A GMRP ORDALTs upgrade Block 2 missiles with the full capability of Block 2A. Deliveries have the same capabilities as new build Block 2A. ORDALTs are bought to budget. A container is required for every three GMRP and GMRP ORDALTs. LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 7 of 14 P-1 Line #11 Volume 1 - 153 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Dec 2020 7.1.1) EF008 G&C (†) 2023 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2023 Mar 2025 100 597,990.00 Y 7.1.1) EF008 G&C (†) 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 605,794.44 Y Jun 2022 7.1.1) EF008 G&C (†) 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 599,090.70 Y Feb 2024 7.1.1) EF008 G&C (†) 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 612,544.72 Y Feb 2024 7.1.1) EF008 G&C (†) 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 628,496.00 Y Feb 2026 (†) 2023 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Mar 2023 Mar 2025 100 83,120.00 Y Dec 2020 (†) 2024 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 85,205.56 Y Jun 2022 (†) 2025 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 84,268.12 Y Feb 2024 (†) 2026 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 86,040.00 Y Feb 2024 (†) 7.1.2) EF008 Propulsion 2027 Raytheon CO / Tuscon, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 91,629.31 Y Feb 2026 7.1.3) EF008 Safe and Arm Device 2023 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2023 Mar 2025 100 6,750.00 Y Dec 2020 7.1.3) EF008 Safe and Arm Device 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 6,855.56 Y Jun 2022 7.1.3) EF008 Safe and Arm Device 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 6,782.65 Y Feb 2024 7.1.3) EF008 Safe and Arm Device 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 6,926.00 Y Feb 2024 7.1.3) EF008 Safe and Arm Device 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 7,862.07 Y Feb 2026 7.1.4) EF008 Ordnance Pack (†) 2023 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2023 Mar 2025 100 52,960.00 Y Dec 2020 7.1.4) EF008 Ordnance Pack (†) 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 54,222.22 Y Jun 2022 7.1.4) EF008 Ordnance Pack (†) 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 53,626.67 Y Feb 2024 7.1.4) EF008 Ordnance Pack (†) 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 54,755.00 Y Feb 2024 7.1.4) EF008 Ordnance Pack (†) Feb 2026 7.1.2) EF008 Propulsion 7.1.2) EF008 Propulsion 7.1.2) EF008 Propulsion 7.1.2) EF008 Propulsion 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 55,904.00 Y 7.1.5) EF008 Warhead 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 25,594.44 Y Jun 2022 7.1.5) EF008 Warhead 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 25,317.52 Y Feb 2024 7.1.5) EF008 Warhead 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 25,849.00 Y Feb 2024 7.1.5) EF008 Warhead 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 28,086.21 Y Feb 2026 7.1.6) EF008 Canister (†) 2023 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2023 Mar 2025 100 59,860.00 Y Dec 2020 7.1.6) EF008 Canister (†) 2024 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Aug 2024 Aug 2026 180 61,077.78 Y Jun 2022 7.1.6) EF008 Canister (†) 2025 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2025 Aug 2027 148 60,409.32 Y Feb 2024 7.1.6) EF008 Canister (†) 2026 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2026 Jun 2028 123 61,681.00 Y Feb 2024 7.1.6) EF008 Canister (†) 2027 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2029 116 64,698.28 Y Feb 2026 LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 8 of 14 P-1 Line #11 Volume 1 - 154 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 FY Contractor and Location 2023 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2023 Mar 2025 3 626,000.00 Y Dec 2020 2024 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2024 Mar 2026 5 641,600.00 Y Jun 2022 7.1.8) EF008 BLK 1 to BLK 2B GMRP ORDALTS 2025 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2025 Aug 2027 4 655,073.60 Y Feb 2024 7.1.8) EF008 BLK 1 to BLK 2B GMRP ORDALTS 2026 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2026 Jun 2028 5 668,800.00 Y Feb 2024 7.1.8) EF008 BLK 1 to BLK 2B GMRP ORDALTS 2027 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2027 Mar 2029 5 682,788.90 Y Feb 2026 7.1.9) EF008 BLK 2 to BLK 2A GMRP ORDALTS 2025 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2025 Aug 2027 70 44,971.43 Y Feb 2024 7.1.9) EF008 BLK 2 to BLK 2A GMRP ORDALTS 2026 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2026 Jun 2028 70 45,916.00 Y Feb 2024 7.1.9) EF008 BLK 2 to BLK 2A GMRP ORDALTS 2027 Raytheon CO / Tucson AZ SS / FFP NAVSEA Mar 2027 Mar 2029 70 46,880.00 Y Feb 2026 8.1.1) EF957 Container 2023 NSWC Indian Head / Picatinny, NJ C / FFP NJ Mar 2023 Sep 2023 35 13,170.73 Y Jan 2023 8.1.1) EF957 Container 2024 NSWC Indian Head / Picatinny, NJ C / FFP NJ Mar 2024 Sep 2024 42 13,976.19 Y Jan 2024 8.1.1) EF957 Container 2025 NSWC Indian Head / Picatinny, NJ C / FFP NJ Mar 2025 Sep 2025 51 13,862.75 Y Jan 2025 8.1.1) EF957 Container 2026 NSWC Indian Head / Picatinny, NJ C / FFP NJ Mar 2026 Sep 2026 43 14,789.47 Y Jan 2026 8.1.1) EF957 Container 2027 NSWC Indian Head / Picatinny, NJ C / FFP NJ Mar 2027 Sep 2027 42 15,105.26 Y Jan 2027 7.1.7) EF008 BLK 2 GMRP ORDALTS (†) 7.1.7) EF008 BLK 2 GMRP ORDALTS (†) Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Method/Type or Funding Vehicle Cost Elements (†) O O C P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 9 of 14 P-1 Line #11 Volume 1 - 155 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7.1.1) EF008 G&C Prior Years Deliveries: 1006 1 2023 NAVY (5) 0 100 1 2024 NAVY 180 0 180 1 2025 NAVY 148 0 148 148 1 2026 NAVY 123 0 123 123 1 2027 NAVY 116 0 116 116 100 A - - - - - - - - - - - - - - - - - - - 100 A - - 180 7.1.2) EF008 Propulsion Prior Years Deliveries: 1006 2 2023 NAVY 100 0 100 2 2024 NAVY 180 0 180 A - - - - - - - - - - - - - - - - - - - 100 A - - 2 2025 NAVY 148 0 148 180 148 2 2026 NAVY 123 0 123 123 2 2027 NAVY 116 0 116 116 7.1.4) EF008 Ordnance Pack Prior Years Deliveries: 881 3 2023 NAVY 100 0 100 3 2024 NAVY 180 0 180 A - - - - - - - - - - - - - - - - - - - 100 A - - 3 2025 NAVY 148 0 148 180 148 3 2026 NAVY 123 0 123 123 3 2027 NAVY 116 0 116 116 7.1.6) EF008 Canister Prior Years Deliveries: 1006 4 2023 NAVY 100 0 100 4 2024 NAVY 180 0 180 4 2025 NAVY 148 0 148 148 4 2026 NAVY 123 0 123 123 4 2027 NAVY 116 0 116 116 7.1.7) EF008 BLK 2 GMRP ORDALTS A - - - - - - - - - - - - - - - - - - - 100 A - - 180 (1) Prior Years Deliveries: 54 5 2023 NAVY 3 0 3 5 2024 NAVY 5 0 5 A O C T LI 2242 - Rolling Airframe Missile (RAM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #11 - - - - - - - 3 A - - - - - - - 5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 156 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7.1.1) EF008 G&C Prior Years Deliveries: 1006 1 2023 NAVY (5) 0 100 - - - - - 1 2024 NAVY 180 0 180 - - - - - 1 2025 NAVY 148 0 148 1 2026 NAVY 123 0 123 1 2027 NAVY 116 0 116 100 8 8 10 8 10 8 8 8 8 8 8 8 - - - - - - - - - - - - A - - - - - - - - - - - - 0 - - - - - 15 15 150 - - - - - - - 148 A - - - - - - - 123 116 7.1.2) EF008 Propulsion Prior Years Deliveries: 1006 2 2023 NAVY 100 0 100 - - - - - 2 2024 NAVY 180 0 180 - - - - - 2 2025 NAVY 148 0 148 2 2026 NAVY 123 0 123 2 2027 NAVY 116 0 116 8 8 10 8 10 8 8 8 8 8 8 8 - - - - - - - - - - - - A - - - - - - - - - - - - 0 - - - - - 15 15 150 - - - - - - - 148 A - - - - - - - 123 116 7.1.4) EF008 Ordnance Pack Prior Years Deliveries: 881 3 2023 NAVY 100 0 100 - - - - - 3 2024 NAVY 180 0 180 - - - - - 3 2025 NAVY 148 0 148 3 2026 NAVY 123 0 123 3 2027 NAVY 116 0 116 8 8 10 8 10 8 8 8 8 8 8 8 - - - - - - - - - - - - A - - - - - - - - - - - - 0 - - - - - 15 15 150 - - - - - - - 148 A - - - - - - - 123 116 7.1.6) EF008 Canister Prior Years Deliveries: 1006 4 2023 NAVY 100 0 100 - - - - - 4 2024 NAVY 180 0 180 - - - - - 4 2025 NAVY 148 0 148 4 2026 NAVY 123 0 123 4 2027 NAVY 116 0 116 7.1.7) EF008 BLK 2 GMRP ORDALTS 8 8 8 10 8 10 8 8 8 8 8 8 - - - - - - - - - - - - A - - - - - - - - - - - - 0 - - - - - 15 15 150 - - - - - - - 148 A - - - - - - - 123 116 (1) Prior Years Deliveries: 54 5 2023 NAVY 3 0 3 - - - - - 5 2024 NAVY 5 0 5 - - - - - O C T LI 2242 - Rolling Airframe Missile (RAM) Navy N O V D E C J A N F E B 2 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #11 2 M A R 2 A P R 1 M A Y 0 J U N J U L A U G S E P Volume 1 - 157 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7.1.1) EF008 G&C Prior Years Deliveries: 1006 1 2023 NAVY (5) 100 0 1 2024 NAVY 180 30 150 15 15 15 15 15 15 15 15 15 15 1 2025 NAVY 148 0 148 - - - - - - - - - - 12 12 12 12 12 12 12 12 13 13 13 13 1 2026 NAVY 123 0 123 - - - - - - - - - - - - - - - - - - - - 10 10 10 10 83 1 2027 NAVY 116 0 116 A - - - - - - - - - - - - - - - - - - - 116 100 0 0 0 7.1.2) EF008 Propulsion Prior Years Deliveries: 1006 2 2023 NAVY 100 100 0 2 2024 NAVY 180 30 150 15 15 15 15 15 15 15 15 15 15 0 2 2025 NAVY 148 0 148 - - - - - - - - - - 12 12 12 12 12 12 12 12 13 13 13 13 2 2026 NAVY 123 0 123 - - - - - - - - - - - - - - - - - - - - 10 10 10 10 83 2 2027 NAVY 116 0 116 A - - - - - - - - - - - - - - - - - - - 116 0 0 7.1.4) EF008 Ordnance Pack Prior Years Deliveries: 881 3 2023 NAVY 100 100 0 3 2024 NAVY 180 30 150 15 15 15 15 15 15 15 15 15 15 0 3 2025 NAVY 148 0 148 - - - - - - - - - - 12 12 12 12 12 12 12 12 13 13 13 13 3 2026 NAVY 123 0 123 - - - - - - - - - - - - - - - - - - - - 10 10 10 10 83 3 2027 NAVY 116 0 116 A - - - - - - - - - - - - - - - - - - - 116 0 0 7.1.6) EF008 Canister Prior Years Deliveries: 1006 4 2023 NAVY 100 100 0 4 2024 NAVY 180 30 150 15 15 15 15 15 15 15 15 15 15 4 2025 NAVY 148 0 148 - - - - - - - - - - 12 12 12 12 12 12 12 12 13 13 13 13 4 2026 NAVY 123 0 123 - - - - - - - - - - - - - - - - - - - - 10 10 10 10 83 4 2027 NAVY 116 0 116 A - - - - - - - - - - - - - - - - - - - 116 7.1.7) EF008 BLK 2 GMRP ORDALTS 0 0 0 (1) Prior Years Deliveries: 54 5 2023 NAVY 3 3 0 5 2024 NAVY 5 5 0 0 0 O C T LI 2242 - Rolling Airframe Missile (RAM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 158 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 7.1.1) EF008 G&C Prior Years Deliveries: 1006 1 2023 NAVY (5) 100 0 0 1 2024 NAVY 180 180 0 0 1 2025 NAVY 148 148 0 1 2026 NAVY 123 40 83 10 10 10 10 10 11 11 11 1 2027 NAVY 116 0 116 - - - - - 10 10 10 100 0 0 10 10 10 10 9 9 9 9 10 0 7.1.2) EF008 Propulsion Prior Years Deliveries: 1006 2 2023 NAVY 100 100 0 0 2 2024 NAVY 180 180 0 0 2 2025 NAVY 148 148 0 2 2026 NAVY 123 40 83 10 10 10 10 10 11 11 11 2 2027 NAVY 116 0 116 - - - - - 10 9 9 0 0 9 9 9 10 10 10 10 10 11 0 7.1.4) EF008 Ordnance Pack Prior Years Deliveries: 881 3 2023 NAVY 100 100 0 0 3 2024 NAVY 180 180 0 0 3 2025 NAVY 148 148 0 3 2026 NAVY 123 40 83 10 10 10 10 10 11 11 11 3 2027 NAVY 116 0 116 - - - - - 10 10 10 0 0 10 10 10 10 9 9 9 9 10 0 7.1.6) EF008 Canister Prior Years Deliveries: 1006 4 2023 NAVY 100 100 0 0 4 2024 NAVY 180 180 0 0 4 2025 NAVY 148 148 0 4 2026 NAVY 123 40 83 10 10 10 10 10 11 11 11 4 2027 NAVY 116 0 116 - - - - - 10 10 10 7.1.7) EF008 BLK 2 GMRP ORDALTS 0 0 10 10 10 10 9 9 9 9 10 0 (1) Prior Years Deliveries: 54 5 2023 NAVY 3 3 0 5 2024 NAVY 5 5 0 0 0 O C T LI 2242 - Rolling Airframe Missile (RAM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 159 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2242 / Rolling Airframe Missile (RAM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / Rolling Airframe Missile (RAM) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Raytheon CO - Tucson, AZ 100 240 360 0 3 24 27 0 3 24 27 2 Raytheon CO - Tuscon, AZ 100 240 360 0 3 24 27 0 3 24 27 3 Raytheon CO - Tucson, AZ 100 240 360 0 3 24 27 0 3 24 27 4 Raytheon CO - Tucson, AZ 100 240 360 0 3 24 27 0 2 24 26 5 Raytheon CO - Tucson AZ 1 240 439 0 0 24 24 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (5) MSR Leverages Cooperative Program (Germany) and other Foreign Military Sales procurements. LI 2242 - Rolling Airframe Missile (RAM) Navy UNCLASSIFIED Page 14 of 14 P-1 Line #11 Volume 1 - 160 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2247 / MSE Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - 23 - 23 244 249 246 247 - 1,009 0.000 0.000 0.000 97.835 1,049.821 1,096.938 1,121.588 1,151.693 - 4,517.875 97.835 0.000 - - - - - - 0.000 0.000 0.000 97.835 0.000 97.835 - - - - - - 0.000 0.000 0.000 97.835 0.000 97.835 1,049.821 1,049.821 1,096.938 1,096.938 1,121.588 1,121.588 To FY 2031 Complete 1,151.693 1,151.693 Total - 4,517.875 - 4,517.875 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - 0.00 - 0.00 0.00 0.00 0.00 0.00 - 0.00 Gross/Weapon System Unit Cost ($ in Dollars) - - - 4,254K - 4,254K 4,303K 4,405K 4,559K 4,663K - 4,478K Description: The Navy's Patriot Advanced Capability 3 (PAC-3) Missile Segment Enhancement (MSE) is a high-velocity, hit-to-kill surface-to-air missile designed to intercept a wide range of threats, including tactical ballistic missiles, air-breathing threats, cruise missiles, and unmanned aerial systems. This capability builds upon the existing Army PAC-3 MSE by incorporating updated software and new radio communications, allowing the missile to be launched from MK 41 Vertical Launching Systems (VLS). The Navy PAC-3 MSE Integration into the Aegis Weapons System offers expanded battlespace performance against evolving threats. The FY 2027 request for PAC-3 MSE includes $97,835 thousand of discretionary and $1,632,988 thousand of mandatory (reconciliation) for a total of $1,730,823 thousand. The mandatory and discretionary funds are necessary to fully fund contract requirements for 405 PAC-3 MSE missiles and canisters (23 discretionary and 382 mandatory). Funding is also provided for engineering support and to resolve production Diminishing Manufacturing Sources. Other Related Budgets: RDTEN PE 0604307N PROJ 1447 [P5 / PAC-3 MSE / Navy]: Both quantities and unit cost are estimates based on US Army contract pricing. Both quantities and unit cost will adjust based on award of DoN CLINs on ARMY contract in execution and final cost of the Navy canister. [P5 / Engineering Support]: Engineering Support, Government and Contractor, provided for both the DoN and US Army. LI 2247 - MSE Missile Navy UNCLASSIFIED Page 1 of 4 P-1 Line #12 Volume 1 - 161 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2247 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / MSE Missile - / 0.000 - / 0.000 - / 0.000 23 / 97.835 - / 0.000 23 / 97.835 P-40 Total Gross/Weapon System Cost - / 0.000 - / 0.000 - / 0.000 23 / 97.835 - / 0.000 23 / 97.835 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 request includes 23 AURs (discretionary) and 382 (mandatory), canisters, and engineering support costs. Both quantities and unit cost are estimates based on US Army contract pricing. Both quantities and unit cost will adjust based on award of DoN CLINs on ARMY contract in execution and final cost of the Navy canister. In alignment with the Munitions Acceleration Council's (MAC) strategic objective to rapidly increase munitions stockpiles, the following plan leverages the existing Army production contract to achieve significant cost avoidance for the Navy. 1. The procurement of up to 344 missiles and canister. By leveraging the high-volume Army PAC-3 MSE production contract, the Navy achieves significant cost avoidance through economies of scale, as unit price decreases with larger quantities. This approach directly supports the MAC's goal of accelerating production efficiently. -Minimum Sustainment Rate (MSR)/Maximum Production Capacity (MAX): 144/550 -Production Lead Time (PLT): 36 Months 2. To support the MAC's accelerated timeline, Production Engineering and Support costs include PM Shield for contract award, necessary Navy infrastructure investments, and program office support. 3. Transition to Production costs are necessary non-recurring engineering efforts to establish a Navy production capability. This includes developing unique test equipment for the Navy missile and canister variants, creating in-canister manuals and procedures, and modifying the MK 33 loader. 4. The certification of reliability leverages the Army's contract with the PAC-3 Missile Support Center (P3MSC). This provides a major cost avoidance for the Navy by utilizing the established technical expertise and facilities of the sole-source prime, Lockheed Martin Missiles and Fire Control (LMMFC), for Field Surveillance Program activities across the Patriot missile family LI 2247 - MSE Missile Navy UNCLASSIFIED Page 2 of 4 P-1 Line #12 Volume 1 - 162 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2247 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MSE Missile MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base - - - 0.000 0.000 0.000 FY 2027 OOC 23 FY 2027 Total - 97.835 23 0.000 97.835 - - - - - - 0.000 0.000 0.000 97.835 0.000 97.835 - - - - - - 0.000 0.000 0.000 97.835 0.000 97.835 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - 4,254K - 4,254K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) PAC-3 MSE / - - - - - - - - - 4,050K - - - - - - - - - 200,000.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Subtotal: Support Cost - - - - - - - - Gross/Weapon System Cost - - 0.000 - - 0.000 - - Navy (1) 1.1.2) Canisters (2) Subtotal: Recurring Cost Subtotal: Hardware Cost 23 93.150 - - - 4,050K 23 93.150 23 4.600 - - - 200,000.00 23 4.600 - 97.750 - - - - - 97.750 - 97.750 - - - - - 97.750 - - 0.085 - - - - - 0.085 - - - 0.085 - - - - - 0.085 0.000 4,254K 23 97.835 - - 0.000 4,254K 23 97.835 Support Cost 2.1) Engineering Support (3) Footnotes: (1) Both quantities and unit cost are estimates based on US Army contract pricing. Both quantities and unit cost will adjust based on award of DoN CLINs on ARMY contract in execution and final cost of the Navy components (radio, canister, etc). The FY 2027 request for PAC-3 MSE includes $97,835 thousand of discretionary and $1,632,988 thousand of mandatory (reconciliation) for a total of $1,730,823 thousand. The mandatory and discretionary funds are necessary to fully fund contract requirements for 405 PAC-3 MSE missiles and canisters (23 discretionary and 382 mandatory). Funding is also provided for engineering support and to resolve production Diminishing Manufacturing Sources. (2) Unlike the missiles themselves, canisters aren't sourced from the prime missile contractor. Specifically, MKxx (TBD) Mod 0 Canisters are for PAC-3 MSE (DoN). Canister is in development in FY 2026. Both quantity and unit price are subject to change based on award of MISSILE CLIN on Army contract. VLS will award a competitive contract for canisters, which will determine Unit price. Canisters quantity will align with MISSILE quantity. LI 2247 - MSE Missile Navy UNCLASSIFIED Page 3 of 4 P-1 Line #12 Volume 1 - 163 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2247 / MSE Missile ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MSE Missile MDAP/MAIS Code: (3) Government and Contractor funding supports: Computer Resources used to identify, plan, resource, and acquire facilities, hardware, software, documentation, manpower and personnel necessary for planning and management of mission critical systems. Government Product Support Management in compliance with the critical acquisition of Product Support Manager (PSM) in accordance with Section 805 of Public Law 111-84. Assist with Demilitarization (DEMIL)/disposal plans, Command Pass Coordinator (CPC), review of ECPs, Milestone Decision Authority (MDA) requirements, risk assessment, Curriculum Design, performance improvement, cost, manage Material Potentially Presenting an Explosive Hazards (MPPEH). Contract Program Management Office (PMO) Subject Management Experts(s) (SME(s)) provide direct support to the PMO by assisting the program manager with day-to-day acquisition and technical requirements. Develop Technical Manuals (revision of contractor provided manuals) and alignment with USN standards. Support Navy PAC-3 MSE Integrated Product Teams, Program Management Reviews and Critical Reviews. System Engineering & Safety review and approval. Participate in Production Readiness Reviews. Conduct assessment of production test data. The PAC-3 Missile Support Center (P3MSC) contract enables reliability certification for Patriot missiles. This is possible because Lockheed Martin Missiles and Fire Control (LMMFC), as the sole provider, offers the necessary technical support, expertise, and facilities to test components and conduct Field Surveillance Program activities. LI 2247 - MSE Missile Navy UNCLASSIFIED Page 4 of 4 P-1 Line #12 Volume 1 - 164 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 1,413 175 277 282 - 282 329 260 317 300 2,793 6,146 368.670 55.315 74.152 73.226 0.000 73.226 87.093 84.490 86.143 87.883 629.664 1,546.636 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 368.670 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 368.670 To FY 2031 Complete - - - - - - - - - 55.315 74.152 73.226 0.000 73.226 87.093 84.490 86.143 87.883 - - - - - - - - - 55.315 74.152 73.226 0.000 73.226 87.093 84.490 86.143 87.883 629.664 629.664 Total 1,546.636 1,546.636 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.474 - - - - - - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - 260,912.95 316,085.71 267,696.75 259,666.67 - 259,666.67 264,720.36 324,961.54 271,744.48 292,943.33 Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) 225,443.61 0.474 0.00 251,649.20 Description: The Joint Air-to-Ground Missile (JAGM) is an Army-led air-launched missile system that incorporates multi-mode seeker technology thus providing advanced Line-of-Sight and Beyond-Line-of-Sight precision fireand-forget seeker targeting capabilities resulting in increased lethality against soft, hardened, moving, stationary, land, and maritime threats. JAGM improves the warfighter's capability in adverse weather, day or night, and in obscured/countermeasure environments. The JAGM Increment 1 system will replace aviation-launched, Tube-launched, Optically-tracked, Wire-guided (TOW) missile, and Helicopter-Launched Fire-&-Forget (HELLFIRE) Missile Systems. JAGM addresses rotary wing and unmanned aerial vehicle requirements. The Department of The Navy threshold platform is AH-1Z. The JAGM system includes the missile, trainers, containers, support equipment, M299 Launcher, and system software modification. Missile configurations include the JAGM Tactical Missile, Captive Air Training Missile (CATM) and Air Training Missile. JAGM procurement funding supports the entire JAGM system to include resolution of obsolescence, safety, reliability, weapon integration activities, test sets, engineering services, production ramp-up activities, and production issues. Prior Year Total Quantity is 1,413; 1,361 JAGM and 52 CATM LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 1 of 10 P-1 Line #13 Volume 1 - 165 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Joint Air Ground Missile (JAGM) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1,413 / 368.670 175 / 55.315 277 / 74.152 282 / 73.226 - / 0.000 282 / 73.226 1,413 / 368.670 175 / 55.315 277 / 74.152 282 / 73.226 - / 0.000 282 / 73.226 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports the procurement of 265 JAGM All Up Rounds (AURs), 17 Captive Air Training Missiles (CATMs), and production related engineering and logistics support. Unit costs are projected to decrease in FY 2027 due to an increased quantity of missiles procured across DoW. The FY 2027 funding request is a decrease from FY 2026 due to decrease in AUR and CATM procurement unit costs. LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 2 of 10 P-1 Line #13 Volume 1 - 166 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 282 - 282 368.670 55.315 74.152 73.226 0.000 73.226 - - - - - 55.315 74.152 73.226 0.000 73.226 - Total Obligation Authority ($ in Millions) FY 2027 Total 277 368.670 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 175 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 1,413 368.670 - - - - - 55.315 74.152 73.226 0.000 73.226 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) 0.474 260,912.95 - 316,085.71 267,696.75 259,666.67 - - 259,666.67 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) (JG010) JAGM All-Up-Round (AUR) (†) 221,441.59 1,361 301.382 268,806.00 163 43.815 249,506.00 257 64.123 241,546.00 265 64.010 - - - 241,546.00 265 64.010 177,557.69 52 9.233 202,900.00 12 2.435 124,000.00 20 2.480 115,320.00 17 1.960 - - - 115,320.00 17 1.960 - - 310.615 - - 46.250 - - 66.603 - - 65.970 - - - - - 65.970 - - 310.615 - - 46.250 - - 66.603 - - 65.970 - - - - - 65.970 2.1) (JG860) Integrated Logistics Support - - 4.430 - - 0.900 - - 0.876 - - 0.764 - - - - - 0.764 2.2) (JG850) Production Engineering Support - - 16.979 - - 3.077 - - 3.010 - - 2.864 - - - - - 2.864 2.4) (JG851) Other Production Support, Army - - 25.656 - - 3.238 - - - - - - - - - - - - 2.5) (JG852) Other Production Support, - - 10.990 - - 1.850 - - - - - - - - - - - - - - - - - - - - 3.663 - - 3.628 - - - - - 3.628 (1) 1.1.3) (JG301) Captive Air Training Missile (†) (2) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - JAGM Support Costs Cost (3) Contractor (4) 2.6) (JG853) Other Production Support (5) LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 3 of 10 P-1 Line #13 Volume 1 - 167 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support - JAGM Support Costs Cost Gross/Weapon System Cost (†) Unit Cost ($) 260,912.95 FY 2025 Total Cost Qty (Each) ($ M) - 58.055 1,413 368.670 Unit Cost ($) 316,085.71 FY 2026 Total Cost Qty (Each) ($ M) - 9.065 175 55.315 Unit Cost ($) 267,696.75 FY 2027 Base Total Cost Qty (Each) ($ M) - 7.549 277 74.152 Unit Cost ($) 259,666.67 FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) - 7.256 - - - 282 73.226 - - 0.000 259,666.67 Total Cost Qty (Each) ($ M) - 7.256 282 73.226 indicates the presence of a P-5a Footnotes: (1) (JG010) All-Up-Round (AUR) unit cost is projected by the Army based on total procurement between all services, resulting in a fluctuation in unit cost from year to year. FY 2027 decreased unit cost is due to significant quantity increases across all services resulting in an increased combined buying power. P5 Prior Year and Total Quantities do not align with P40 due to significant quantity increases for FY 2023 and FY 2024 adjustments will result in JAGM AUR Total Prior Year Quantity of 1361 and Total Quantity of 6033. (2) (JG301) Captive Air Training Missiles unit cost will fluctuate according to total procurement between all services. P5 Prior Year Quantity does not align with P40 due to significant quantity increases for FY 2024. Adjustments result in CATM Total Prior Year Quantity of 52 and reduced FYDP quantities to maintain consistent Total Cost Quantity of 113. (3) (JG851) Other Production Support, Army - Funding combined with Other Production Support, Contractor to consolidate into one new JG853 Other Production Support cost element to align with signed MOA dated April 2024 (4) (JG852) Other Production Support, Contractor - Funding combined with Other Production Support, Army to consolidate into one new JG853 Other Production Support cost element to align with signed MOA dated April 2024 (5) (JG853) Cost Element created to combine previous cost elements, "Other Production Support, Contract" and "Other Production Support, Army". This change aligns with a MOA that was signed April 2024 that changes how the production support is budgeted. Other Production Support is for program management administrative fees for execution of JAGM production and deliveries. Funding fluctuates based on the total procurement buy each year. LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 4 of 10 P-1 Line #13 Volume 1 - 168 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 FY Contractor and Location 2022 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Mar 2023 Mar 2025 152 256,751.00 Y Sep 2020 2023 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Jul 2023 Dec 2025 295 240,028.00 Y Sep 2020 2024 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Mar 2024 Dec 2026 260 245,903.00 Y Sep 2020 2025 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Aug 2025 Sep 2027 163 268,806.00 Y Sep 2020 2026 Lockheed Martin / Orlando, FL SS / FFP Huntsville, AL Aug 2026 Sep 2028 257 249,506.00 Y Aug 2025 2027 Lockheed Martin / Orlando, FL SS / FFP Huntsville, AL Aug 2027 Sep 2029 265 241,546.00 Y Oct 2025 1.1.3) (JG301) Captive Air Training Missile 2022 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Mar 2023 Mar 2025 6 210,202.06 Y Sep 2020 1.1.3) (JG301) Captive Air Training Missile 2023 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Jul 2023 Dec 2025 7 190,003.98 Y Sep 2020 1.1.3) (JG301) Captive Air Training Missile 2024 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Mar 2024 Dec 2026 21 194,981.08 Y Sep 2020 1.1.3) (JG301) Captive Air Training Missile 2025 Lockheed Martin / Orlando, FL SS / FPIF Huntsville, AL Aug 2025 Sep 2027 12 202,900.00 Y Sep 2020 1.1.3) (JG301) Captive Air Training Missile 2026 Lockheed Martin / Orlando, FL SS / FFP Huntsville, AL Aug 2026 Sep 2028 20 124,000.00 Y Aug 2025 1.1.3) (JG301) Captive Air Training Missile 2027 Lockheed Martin / Orlando, FL SS / FFP Huntsville, AL Aug 2027 Sep 2029 17 115,320.00 Y Oct 2025 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) 1.1.1) (JG010) JAGM All-Up-Round (†) (AUR) (†) Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 5 of 10 P-1 Line #13 Volume 1 - 169 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) (JG010) JAGM All-Up-Round (AUR) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 654 1 2022 1 2022 NAVY 152 0 152 A - - - - - - - - - - - - - - - - - - - 152 490 0 490 A - - - - - - - - - - - - - - - - - - - ARMY 1 2022 490 Total 642 0 642 - - - - - - - - - - - - - - - - - - - 1 642 2023 NAVY 295 0 295 A - - - - - - - - - - - - - - - 295 1 2023 ARMY 629 0 629 A - - - - - - - - - - - - - - - 629 1 2023 Total 924 0 924 - - - - - - - - - - - - - - - 924 1 2024 NAVY 260 0 260 A - - - - - - - 260 1 2024 ARMY 1,117 0 1,117 A - - - - - - - 1,117 1 2024 Total 1,377 0 1,377 - - - - - - - 1,377 1 2025 NAVY 163 0 163 163 1 2025 ARMY 1,000 0 1,000 1,000 1 2025 Total 1,163 0 1,163 1,163 1 2026 NAVY 257 0 257 257 1 2026 ARMY 178 0 178 178 1 2026 Total 435 0 435 435 1 2027 NAVY 265 0 265 265 1 2027 ARMY 269 0 269 269 1 2027 Total 534 0 534 (‡) (‡) (‡) (‡) (‡) (‡) 534 O C T LI 2248 - Joint Air Ground Missile (JAGM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 170 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) (JG010) JAGM All-Up-Round (AUR) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N Calendar Year 2026 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 654 1 2022 1 2022 NAVY 152 0 152 - - - - - 12 12 12 12 13 13 13 13 13 13 13 13 490 0 490 - - - - - 40 40 41 41 41 41 41 41 41 41 41 41 ARMY 1 2022 Total 642 0 642 - - - - - 52 52 53 53 54 54 54 54 54 54 54 54 - - - - - - - 1 0 2023 NAVY 295 0 295 - - - - - - - - - - - - - - 24 24 24 24 24 25 25 25 25 25 50 1 2023 ARMY 629 0 629 - - - - - - - - - - - - - - 52 52 52 52 52 52 52 53 53 53 106 1 2023 Total 924 0 924 - - - - - - - - - - - - - - 76 76 76 76 76 77 77 78 78 78 156 1 2024 NAVY 260 0 260 - - - - - - - - - - - - - - - - - - - - - - - - 260 1 2024 ARMY 1,117 0 1,117 - - - - - - - - - - - - - - - - - - - - - - - - 1,117 1 2024 Total 1,377 0 1,377 - - - - - - - - - - - - - - - - - - - - - - - - 1,377 1 2025 NAVY 163 0 163 A - - - - - - - - - - - - - - 163 1 2025 ARMY 1,000 0 1,000 A - - - - - - - - - - - - - - 1,000 1 2025 Total 1,163 0 1,163 - - - - - - - - - - - - - - 1,163 1 2026 NAVY 257 0 257 A - - 257 1 2026 ARMY 178 0 178 A - - 178 1 2026 Total 435 0 435 - - 435 1 2027 NAVY 265 0 265 265 1 2027 ARMY 269 0 269 269 1 2027 Total 534 0 534 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 534 O C T LI 2248 - Joint Air Ground Missile (JAGM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 171 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) (JG010) JAGM All-Up-Round (AUR) Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 654 1 2022 1 2022 NAVY 152 152 0 490 490 0 ARMY 1 2022 Total 642 642 0 - - 1 2023 NAVY 295 245 50 25 25 1 2023 ARMY 629 523 106 53 53 1 2023 Total 924 768 156 78 78 - - - - - - - - - - - - 1 2024 NAVY 260 0 260 - - 21 21 21 21 22 22 22 22 22 22 22 22 1 2024 ARMY 1,117 0 1,117 - - 93 93 93 93 93 93 93 93 93 93 93 94 1 2024 Total 1,377 0 1,377 - - 114 114 114 114 115 115 115 115 115 115 115 116 - - - - - - - - - 1 2025 NAVY 163 0 163 - - - - - - - - - - - 13 13 13 13 13 14 14 14 14 14 14 14 1 2025 ARMY 1,000 0 1,000 - - - - - - - - - - - 83 83 83 83 83 83 83 83 84 84 84 84 1 2025 Total 1,163 0 1,163 - - - - - - - - - - - 96 96 96 96 96 97 97 97 98 98 98 98 - 0 1 2026 NAVY 257 0 257 - - - - - - - - - - - - - - - - - - - - - - - 21 236 1 2026 ARMY 178 0 178 - - - - - - - - - - - - - - - - - - - - - - - 14 164 1 2026 Total 435 0 435 - - - - - - - - - - - - - - - - - - - - - - - 35 400 1 2027 NAVY 265 0 265 A - - - - - - - - - - - - - - 265 1 2027 ARMY 269 0 269 A - - - - - - - - - - - - - - 269 1 2027 Total 534 0 534 - - - - - - - - - - - - - - 534 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 O C T LI 2248 - Joint Air Ground Missile (JAGM) Navy N O V - - - - - - - - - - - - - - - - - - - - - - 0 0 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V - - - - - - - - - - 0 0 0 D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G - 0 0 0 S E P Volume 1 - 172 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) (JG010) JAGM All-Up-Round (AUR) Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 654 1 2022 1 2022 NAVY 152 152 0 490 490 0 ARMY 1 2022 Total 642 642 0 1 2023 NAVY 295 295 0 1 2023 ARMY 629 629 0 1 2023 Total 924 924 0 1 2024 NAVY 260 260 0 1 2024 ARMY 1,117 1,117 0 1 2024 Total 1,377 1,377 0 1 2025 NAVY 163 163 0 1 2025 ARMY 1,000 1,000 0 1 2025 Total 1,163 1,163 0 - - - - - - - - - - - 1 2026 NAVY 257 21 236 21 21 21 21 21 21 22 22 22 22 22 1 2026 ARMY 178 14 164 14 15 15 15 15 15 15 15 15 15 15 1 2026 Total 435 35 400 35 36 36 36 36 36 37 37 37 37 37 - - - - - - - - - - - - 1 2027 NAVY 265 0 265 - - - - - - - - - - - 22 22 22 22 22 22 22 22 22 22 22 23 1 2027 ARMY 269 0 269 - - - - - - - - - - - 22 22 22 22 22 22 22 23 23 23 23 23 1 2027 Total 534 0 534 - - - - - - - - - - - 44 44 44 44 44 44 44 45 45 45 45 46 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T LI 2248 - Joint Air Ground Missile (JAGM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 10 - - - - - - - - - - - - - 0 0 0 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G - 0 0 0 S E P Volume 1 - 173 0 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2248 / Joint Air Ground Missile (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Joint Air Ground Missile (JAGM) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin - Orlando, FL MSR For 2027 1-8-5 For 2027 MAX For 2027 720 1,200 1,200 ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 5 24 Total After Oct 1 ALT Prior to Oct 1 29 ALT After Oct 1 9 Manufacturing PLT 11 Total After Oct 1 24 35 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2248 - Joint Air Ground Missile (JAGM) Navy UNCLASSIFIED Page 10 of 10 P-1 Line #13 Volume 1 - 174 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 4,872.688 4,872.688 4,872.688 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 180.233 180.233 180.233 182.704 182.704 182.704 179.931 - 0.000 - 179.931 - 0.000 - 179.931 0.000 179.931 179.931 179.931 225.505 225.505 225.505 254.307 254.307 254.307 249.390 249.390 249.390 To FY 2031 Complete 254.422 Continuing 254.422 Total - Continuing Continuing - Continuing - - Continuing Continuing 7.320 Continuing Continuing 254.422 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 4.332 4.940 1.919 - 1.919 5.978 5.615 7.173 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Aerial Targets program provides threat representative aerial targets for test and evaluation (T&E) and fleet training events. Assets procured under this line item are used to simulate and replicate currently fielded subsonic and supersonic Anti-Ship Cruise Missile (ASCM) threats and Air-to-Air threats. The threat representative targets are used to test and evaluate Navy ship self-defense systems currently in development and are required for the successful completion of independent operational test and evaluation prior to fielding the systems to the fleet. Some variants are also used as fleet training assets to support fleet readiness. All assets procured by the Aerial Targets program are critical to evaluating combat and weapon system performance and improving fleet proficiency in counter-ASCM ship area, Air-to-Air, and self-defense missions. This program is composed of four primary components: (1) Subsonic Aerial Targets, (2) Supersonic Targets, (3) Full Scale Aerial Target (FSAT), and (4) Auxiliary/Augmenting Systems. (1) Subsonic Aerial Targets The Subsonic Aerial Targets (SSAT) portfolio is composed of production and sustainment programs that consist of the BQM-177A, BQM-34S, BQM-167A and other various aerial target programs. The BQM-177A SSAT provides dynamic, high subsonic, sea-skimming, Anti -Ship Cruise Missile threat emulation for fleet training and for the testing of USN ship self-defensive weapon systems and other surfaceto-air systems. Funding is used for the procurement of the BQM-177A and to procure associated hardware and mission kits, avionics upgrade kits, modifications, Engineering Change Proposals (ECPs) and software upgrades as required. In FY 2020, BQM-177A procurement transitioned from Low-Rate Initial Production (LRIP) to Full Rate Production (FRP). Full Operational Capability (FOC) was declared in February 2022. The BQM-34S is a jet powered, high subsonic speed aerial target, capable of accommodating high performance payloads for threat emulation. The increased size, weight, and power (SWaP) of the BQM-34S fulfills the rising demand to test new weapon systems against increasingly complex payloads designed to emulate airborne threat radars and jammers. Funding efforts for the BQM-34S are for continued utilization of current inventories and/or additional production as required to support unique radar emulator, electronic attack and electronic protection payload presentations. The BQM-167A is subscale target slightly larger than the BQM-177A and is operated by the US Air Force. It is a jet powered, high subsonic that emulates threat aircraft and capable of emulating threat missiles. The BQM-167A is used by operational USN squadrons that participate in Navy Weapon System Evaluation Program (NWSEP) at Tyndall Air Force Base, FL. NWSEP is the traditional mechanism for USN squadrons to execute air-to-air live fire events provided by their Non-Combat Expenditure Allocation (NCEA) to support Training and Readiness (T&R) requirements as part of the Optimized Fleet Response Plan (OFRP) prior to deployment. NWSEP also satisfies Follow-on Operational Test and Evaluation (FOT&E) testing for missile systems in production and sustainment. These SSAT assets are recoverable and reused dependent on the objectives of each event. Funding may also be used to procure other subsonic targets in support of unique and emerging threat simulations. (2) Supersonic Targets The Supersonic targets acquisition program develops, modifies, and procures supersonic targets and boosters to replicate supersonic Anti-Ship Cruise Missile (ASCM) threats. This includes production of the non-recoverable GQM-163A Supersonic Sea Skimming Target (SSST) that is capable of speeds in excess of Mach 2.5 and cruise altitudes as low as 13 feet for the sea skimming regime and a climb to 52,000 feet for a high dive profile and capable of single-plane acceleration maneuvers up to 12g. The GQM-163A meets threat surrogate requirements for critical Test & Evaluation requirements of USN ship self- LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 1 of 25 P-1 Line #15 Volume 1 - 175 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2280 / Aerial Targets Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A defense systems along with meeting fleet training Live Fire With a Purpose pre-deployment requirements. The AQM-88 Supersonic Air Launch Target (SALT) modification effort converts AGM-88 High Speed Anti-Radiation Missile (HARM) into inert targets for fleet training, to simulate supersonic Anti-Ship Cruise Missile (ASCM) threats. Funding is also used for Engineering Change Proposals, modifications, and software upgrades for current and follow-on supersonic targets, to help Supersonic targets keep pace with emerging threats. (3) Full Scale Aerial Target (FSAT) The QF-16 FSAT is an United States Air Force (USAF) led program providing 4th Generation full-scale threat representative targets. The QF-16 FSAT is a converted F-16 aircraft that provides programs with a supersonic, high altitude and remote-controlled aerial target. This target has full command and control capability through normal flight envelopes. The QF-16 target presentations support aircraft and weapons system program testing and development to include the Joint Strike Fighter, AIM-9X Sidewinder Missile, AIM-120 Advanced Medium Range Air-to-Air Missile (AMRAAM) and Standard Missile-6. The USAF and USN are looking into alternative courses of action for the next generation of full-scale targets. (4) Target Augmentation and Auxiliary Systems (TA/AS) The Target Augmenting and Auxiliary Systems includes various procurements of target control systems required to safely operate all aerial targets and threat simulator payloads that replicate electronic attack and active emitters found on current threat missiles. The Target Mission Support Systems (TMSS) program provides target control and scoring, location, and navigation of targets for fleet training and weapons systems test and evaluation. The Target Threat Simulation Program (TTSP) systems, installed on subsonic or supersonic targets as required, replicate various threats dependent upon the objectives of the test and evaluation event(s). When the target is destroyed, these assets are consumed and require replacement. As requirements to establish readiness capability increase, it is critical to maintain sufficient inventory of the Augmenting and Auxiliary Systems. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 2 of 25 P-1 Line #15 Volume 1 - 176 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Subsonic Aerial Targets P-5a, P-21 - / 1,155.697 - / 74.836 - / 76.110 - / 77.895 - / 0.000 - / 77.895 P-5 2 / Supersonic Targets P-5a, P-21 - / 1,087.425 - / 83.465 - / 84.689 - / 74.988 - / 0.000 - / 74.988 P-5 3 / Full Scale Aerial Target / 9.688 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-5 4 / Target Aug/Aux System - / 2,619.878 - / 21.932 - / 21.905 - / 27.048 - / 0.000 - / 27.048 P-40 Total Gross/Weapon System Cost - / 4,872.688 - / 180.233 - / 182.704 - / 179.931 - / 0.000 - / 179.931 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Subsonic Aerial Targets FY 2027 funding supports the procurement of 41 BQM-177A Subsonic Aerial Targets (SSATs) to support forecasted test and evaluation and Fleet Live Fire with a Purpose training requirements, as well as associated kits, equipment, and support. In addition, two (2) BQM-167A will be procured to include associated hardware, modifications, and associated production support. Funds are also provided for the start up costs associated with the restart of the BQM-34S production line. Funds also support continued procurement/installation of kits for modification to the BQM-177A and BQM-34S targets and other subsonic target hardware. Kits can include avionics upgrades and actuator obsolescence. Supersonic Targets FY 2027 funding supports the procurement of 10 GQM-163A Supersonic Sea Skimming Targets, boosters, target modifications, as well as associated kits, equipment, and support. Funds are also provided for costs associated with alternative and second sourcing of materials within the Supersonic portfolio. Procurement includes funds for GQM-163A targets for the Commander, SIXTH Fleet, Formidable Shield / Maritime Theater Missile Defense Forum at Sea Demonstration in support of advancing U.S. and NATO Integrated Air and Missile Defense maritime force interoperability and readiness. Additionally, funding supports the AQM-88 Supersonic Air Launch Target (SALT) modification which converts AGM-88 High Speed Anti-Radiation Missile (HARM) into inert targets for Fleet Live Fire with a Purpose exercises, to simulate supersonic Anti-Ship Cruise Missile (ASCM) threats. Full Scale Aerial Targets (FSAT) The USAF, as the lead service for the FSAT, is evaluating options for the next generation FSAT. Target Augmentation and Auxiliary Systems (TA/AS) FY 2027 funding is required for Target Augmenting and Auxiliary Systems to continue production of various target command and control systems, scoring equipment, location, identification, and navigation equipment required to safely operate all aerial targets. The targets require production of various threat simulator payloads that provide affordable high fidelity simulation environments of foreign threat electronic attack and threat radar emissions. Target threat simulation requires various electronic countermeasures equipment and active emitter augmentation equipment. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 3 of 25 P-1 Line #15 Volume 1 - 177 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 74.836 76.110 77.895 0.000 77.895 - Gross/Weapon System Cost ($ in Millions) 1,155.697 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,155.697 Plus CY Advance Procurement ($ in Millions) - - - - - 74.836 76.110 77.895 0.000 77.895 - Total Obligation Authority ($ in Millions) 1,155.697 FY 2027 Total - - - - - 74.836 76.110 77.895 0.000 77.895 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Subsonic Target Hardware Cost Recurring Cost 1.1.1) EM031 BQM-177A 789.259 (†) (1) 1.1.2) EM441 Install/ Mission Kits (2) 1.1.3) EM442 BQM-177A Other HW / Modifications (3) 1.1.5) EM452 BQM-34 Target Modification (4) 1.1.6) EM100 BQM-167A 262.034 - - 50.532 - - - - 1,139.333 (†) (5) 1.1.7) EM462 BQM-167A Other 332 6 65 55.100 - - 5.692 39.924 - - 25.205 - - 6.836 847.685 1,486.000 2 65 56.481 - - 5.496 4.554 - - 0.890 - - 2.972 868.933 1,104.750 2 41 37.180 - - 0.000 - - 4.144 - - 0.000 4.950 - - 3.680 - - 0.880 - - 0.845 - 2.253 2.210 906.832 1,126.740 2 906.832 41 37.180 - - 4.144 0.000 - - 3.680 - 0.000 - - 0.845 - - 0.000 1,126.740 2 2.253 - - 0.104 - - 0.002 - - 0.254 - - 0.256 - - 0.000 - - 0.256 Subtotal: Recurring Cost - - 384.635 - - 69.210 - - 70.271 - - 48.358 - - 0.000 - - 48.358 Subtotal: Flyaway Subsonic Target Hardware Cost - - 384.635 - - 69.210 - - 70.271 - - 48.358 - - 0.000 - - 48.358 HW / Modifications (6) Flyaway - Subsonic Targets Nonrecurring & Ancillary Equipment Cost Non Recurring Cost LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 4 of 25 P-1 Line #15 Volume 1 - 178 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) 2.1.1) EM570 BQM-34S Non- FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 24.533 - - 0.000 - - 0.000 - - 21.500 - - 0.000 - - 21.500 2.1.2) EM540 Technical Support - - 1.427 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 25.960 - - 0.000 - - 0.000 - - 21.500 - - 0.000 - - 21.500 - - 25.960 - - 0.000 - - 0.000 - - 21.500 - - 0.000 - - 21.500 - - 28.193 - - 0.150 - - 0.150 - - 0.150 - - 0.000 - - 0.150 - - 28.193 - - 0.150 - - 0.150 - - 0.150 - - 0.000 - - 0.150 - - 28.193 - - 0.150 - - 0.150 - - 0.150 - - 0.000 - - 0.150 Recurring (7) Subtotal: Flyaway - Subsonic Targets Nonrecurring & Ancillary Equipment Cost Flyaway - Subsonic Target Launch Hardware Cost Recurring Cost 3.1.1) EM701 Subsonic Ground Equipment (8) Subtotal: Recurring Cost Subtotal: Flyaway Subsonic Target Launch Hardware Cost Flyaway - Subsonic Prior Year/Not In Production Cost Non Recurring Cost 4.1.1) Prior Year/Not In Production Cost Subsonic - - 668.340 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 668.340 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway Subsonic Prior Year/Not In Production Cost - - 668.340 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 37.494 - - 4.301 - - 4.490 - - 6.263 - - 0.000 - - 6.263 - - 10.108 - - 1.175 - - 1.199 - - 1.624 - - 0.000 - - 1.624 - - 0.967 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - Subsonic Production Support Cost 5.1) EM851 Subsonic Production Engineering Support (9) 5.2) EM861 Subsonic Integrated Logistic Support 5.3) EM871 Publications, Training Materials and Equipment (10) LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 5 of 25 P-1 Line #15 Volume 1 - 179 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Subtotal: Support - Subsonic Production Support Cost - - 48.569 - - 5.476 - - 5.689 - - 7.887 - - 0.000 - - 7.887 Gross/Weapon System Cost - - 1,155.697 - - 74.836 - - 76.110 - - 77.895 - - 0.000 - - 77.895 (†) indicates the presence of a P-5a Footnotes: (1) EM031 BQM-177A: FY 2027 will fund FRP-8 contract for the procurement of BQM-177A Subsonic Targets to ensure fleet readiness capability. FRP-8 is a new contract and unit cost is based on projected unit cost pricing in the cost model. FY 2027 units reduced to support non-recurring efforts for the BQM-34S production restart program. (2) The EM441 Install/Mission Kits are required to support fleet training and acquisition program test and evaluation. Mission kit quantities and variants vary depending on test & evaluation and training requirements. Kits are not procured on a one for one basis with air vehicle quantities, but rather are procured in different configuration options and installed after delivery depending on the specific presentation requirement. Each production target requires at least one basic kit and can accommodate up to five different kits depending on the event. Prices range from a basic kit at ~$43K ea. (altimeter, transponder) to a complex kit (altimeter, transponder, telemetry, ECCM/ALE-47) at ~$200K ea. (3) EM442 BQM-177A Other Hardware and Modifications: Funding supports hardware procurements, modifications and other production improvements and Engineering Change Proposals (ECPs) to help subsonic targets keep pace with emerging threats. The total cost may vary from year to year as it depends on the Warfighter and Training demands and costs of the modifications and engineering changes. (4) (5) EM452 BQM-34 Target Modification: Funding supports hardware procurements, modification, and other improvements and ECPs to address component obsolescence payload integration. EM100 BQM-167A: The BQM-167A is utilized by operational USN squadrons that participate in Navy Weapon System Evaluation Program (NWSEP) at Tyndall Air Force Base, FL. NWSEP is the traditional mechanism for USN squadrons to execute Training and Readiness (T&R) requirements provided by Non-Combat Expenditure Allocation (NCEA) as part of Fleet Readiness Plans (FRP) prior to deployment. The USN is procuring an allocation, known as virtual tails, from the USAF and assets will be provided for our planned operations. (6) EM462 BQM-167A Other Hardware and Modifications: Funding supports hardware procurements, modifications and other production improvements and Engineering Change Proposals (ECPs) to help subsonic targets keep pace with emerging threats. The total cost may vary from year to year as it depends on the Warfighter and Training demands and costs of the modifications and engineering changes. (7) EM570 BQM-34S Non Recurring supports BQM-34S production restart. Cost element funds revitalization of the BQM-34S production line. Production restart will maintain the same form, fit and function as the current BQM-34S. The funding addresses obsolescence items that include actuators, manufacturer platform planning and tooling. FY27 planned efforts include drawing updates, actuator modifications, NRE, tooling and special test equipment. (8) (9) EM701 Subsonic Ground Equipment: Funding is required for ground equipment in support of launchers and maintenance stands. FY 2027 production engineering support is augmented to facilitate key activities including engineering management of obsolescence efforts, supplier qualifications, acquisition documentation, and training manual updates necessary for a successful BQM-34S production restart. (10) Publication, Training Materials and Equipment are being procured via the OEM Support Contract. All government Tech Pub updates, material or equipment support will be funded via the appropriate cost element and appropriation as required. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 6 of 25 P-1 Line #15 Volume 1 - 180 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements (†) 1.1.1) EM031 BQM-177A (†) 1.1.1) EM031 BQM-177A (†) 1.1.1) EM031 BQM-177A (†) 1.1.1) EM031 BQM-177A 1.1.6) EM100 BQM-167A 1.1.6) EM100 BQM-167A 1.1.6) EM100 BQM-167A (†) FY 2024 (11) 2025 (13) 2026 (14) 2027 (16) 2025 (17) 2026 (18) 2027 (19) Contractor and Location P-1 Line Item Number / Title: 2280 / Aerial Targets Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Kratos (12) / Sacramento, CA SS / FFP NAVAIR Jan 2024 Mar 2025 55 815.527 Y Aug 2021 Kratos (12) / Sacramento, CA SS / FFP NAVAIR Jan 2025 Apr 2026 65 847.685 Y Aug 2021 Kratos (15) / Sacramento, CA SS / FFP NAVAIR Jan 2026 Jul 2027 65 868.933 Y Aug 2021 Kratos (15) / Sacramento, CA SS / FFP NAVAIR Jan 2027 Aug 2027 41 906.832 Y Sep 2025 Kratos / Sacramento, CA SS / FFP Tyndall AFB, FL Mar 2025 Oct 2026 2 1,486.000 Y Mar 2020 Kratos / Sacramento, CA SS / FFP Tyndall AFB, FL Mar 2026 Oct 2027 2 1,104.750 Y Mar 2020 Kratos / Sacramento, CA SS / FFP Tyndall AFB, FL Mar 2027 Oct 2028 2 1,126.740 Y Mar 2020 indicates the presence of a P-21 Footnotes: (11) (12) (13) (14) (15) (16) (17) (18) (19) FRP-5 is a pre-negotiated option in conjunction with FRP-4 contract. FRP 5 includes 15 Congressional add RDTE funded units that were delivered February 2026. Updated Max quantity from 72 to 70 per contractor FRP-6 is a pre-negotiated option in conjunction with FRP-4 contract. FRP-7 is a pre-negotiated option in conjunction with FRP-4 contract. Updated Max quantity from 72 to 70 per contractor FRP-8 will be a new contract; base plus three pre-negotiated options for FRP-9 through FRP-11. USN will leverage existing USAF contract. USN will leverage existing USAF contract. USN will leverage existing USAF contract. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 7 of 25 P-1 Line #15 Volume 1 - 181 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM031 BQM-177A PROC QTY Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 277 (20) 0 55 - - 65 0 65 A - - - - - - - - - 65 10 0 10 A - - - - - - - - - 10 Total 75 0 75 - - - - - - - - - 75 NAVY 65 0 65 5 0 5 5 70 0 70 70 41 0 41 41 5 0 5 5 46 0 46 46 1 2024 NAVY 1 2025 NAVY 1 2025 FMS 1 2025 2 2026 2 2026 FMS 2 2026 Total 2 2027 NAVY 2 2027 FMS 2 2027 Total (‡) (‡) (‡) 55 A - - - - - - - - - - - 6 6 6 6 6 4 3 18 65 O C T LI 2280 - Aerial Targets Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 182 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM031 BQM-177A PROC QTY Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 277 (20) 37 18 65 0 65 - - - - - - 10 0 10 - - - - - - Total 75 0 75 - - - - - - 2026 NAVY 65 0 65 A - - - - - - - - - - - - - - - 2 2026 FMS 2 2026 Total 2 2027 NAVY 2 2027 FMS 2 2027 Total 1 2024 NAVY 1 2025 NAVY 1 2025 FMS 1 2025 2 (‡) (‡) (‡) 55 3 3 2 2 2 2 2 2 5 5 - 0 5 5 5 5 - 10 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 - - - - 5 - - 5 - - - 6 5 5 - 5 0 5 A - - - - - - - - - - - - - - - - - - 70 0 70 - - - - - - - - - - - - - - - - - - 41 0 41 A - - - - - - - 5 0 5 A - - - - - - - 46 0 46 - - - - - - - O C T LI 2280 - Aerial Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N 0 0 6 - 6 J U L - 47 6 52 4 33 4 38 6 4 - 5 4 A U G 0 6 5 S E P Volume 1 - 183 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM031 BQM-177A PROC QTY Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 277 (20) 55 0 0 65 65 0 0 10 10 0 Total 75 75 0 NAVY 65 18 47 5 0 5 Total 70 18 52 6 6 6 6 5 5 6 6 6 2027 NAVY 41 8 33 4 4 4 4 4 3 3 3 3 2 2027 FMS 5 0 5 2 2027 Total 46 8 38 1 2024 NAVY 1 2025 NAVY 1 2025 FMS 1 2025 2 2026 2 2026 FMS 2 2026 2 (‡) (‡) (‡) 55 0 6 6 - N O V D E C J A N F E B M A R A P R - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - - 1 0 6 J U L 0 0 5 3 J U N 0 0 3 M A Y - 5 3 1 - 3 6 - 4 6 - 4 5 - 4 5 - 4 6 - 4 6 - O C T LI 2280 - Aerial Targets Navy - A U G UNCLASSIFIED Page 10 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 184 0 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / Subsonic Aerial Targets Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Kratos (12) - Sacramento, CA 30 45 70 0 11 7 18 0 4 15 19 2 Kratos (15) - Sacramento, CA 30 45 70 0 11 7 18 0 4 18 22 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (12) (15) (20) Updated Max quantity from 72 to 70 per contractor Updated Max quantity from 72 to 70 per contractor FRP 5 includes 15 RDTE units delivered February 2026. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 11 of 25 P-1 Line #15 Volume 1 - 185 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Supersonic Targets MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 83.465 84.689 74.988 0.000 74.988 - Gross/Weapon System Cost ($ in Millions) 1,087.425 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,087.425 Plus CY Advance Procurement ($ in Millions) - - - - - 83.465 84.689 74.988 0.000 74.988 - Total Obligation Authority ($ in Millions) 1,087.425 FY 2027 Total - - - - - 83.465 84.689 74.988 0.000 74.988 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Other Targets Hardware Cost Recurring Cost 1.1.1) EM203 GQM-163A (†) (21) 2,942.000 214 629.588 4,509.538 13 58.624 4,509.538 13 58.624 5,502.900 10 55.029 - - 0.000 5,502.900 10 55.029 1.1.2) EM204 GQM-163A Boosters - - 28.766 - - 7.500 - - 7.500 - - 8.182 - - 0.000 - - 8.182 Subtotal: Recurring Cost - - 658.354 - - 66.124 - - 66.124 - - 63.211 - - 0.000 - - 63.211 - - 658.354 - - 66.124 - - 66.124 - - 63.211 - - 0.000 - - 63.211 - - 44.245 - - 1.973 - - 1.985 - - 2.000 - - 0.000 - - 2.000 - - 41.131 - - 9.204 - - 10.892 - - 4.460 - - 0.000 - - 4.460 - - 14.647 - - 2.880 - - 2.347 - - 2.181 - - 0.000 - - 2.181 - - 100.023 - - 14.057 - - 15.224 - - 8.641 - - 0.000 - - 8.641 (22) Subtotal: Flyaway - Other Targets Hardware Cost Flyaway - Hardware-Other Targets Cost Non Recurring Cost 2.1.1) EM442 Install/ Mission Kits (23) 2.1.2) EM443 Hardware Procurements / Modifications (24) 2.1.3) EM444 AQM-88 Supersonic Air Launch Target (SALT) Modification (25) Subtotal: Non Recurring Cost LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 12 of 25 P-1 Line #15 Volume 1 - 186 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Supersonic Targets MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Flyaway Hardware-Other Targets Cost Qty (Each) - FY 2025 Total Cost ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - 100.023 - - 14.057 - - 15.224 - - 8.641 - - 0.000 - - 8.641 - - 12.579 - - 0.505 - - 0.506 - - 0.507 - - 0.000 - - 0.507 Subtotal: Non Recurring Cost - - 12.579 - - 0.505 - - 0.506 - - 0.507 - - 0.000 - - 0.507 Subtotal: Flyaway - Other Targets Launch Hardware Cost - - 12.579 - - 0.505 - - 0.506 - - 0.507 - - 0.000 - - 0.507 Flyaway - Other Targets Launch Hardware Cost Non Recurring Cost 3.1.1) EM702 Ground Equipment (26) Flyaway - GQM-163A Long Lead Item Cost Recurring Cost 4.1.1) Long Lead Credit - - -6.008 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.2) Long Lead Components - - 5.745 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - -0.263 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway GQM-163A Long Lead Item Cost - - -0.263 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Flyaway - Other Targets FY06 and PRIOR Cost Non Recurring Cost 5.1.1) Non Recurring Cost - - 250.054 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 250.054 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway - Other Targets FY06 and PRIOR Cost - - 250.054 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1) EM852 Production Engineering Support - - 52.070 - - 2.779 - - 2.835 - - 2.629 - - 0.000 - - 2.629 6.2) EM853 NSWC WSMR ARAV Target Support (OCO Funds) - - 6.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.3) EM854 Hebrides/ Formidable Shield Exercises - - 8.108 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 66.678 - - 2.779 - - 2.835 - - 2.629 - - 0.000 - - 2.629 Support Cost Subtotal: Support Cost LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 13 of 25 P-1 Line #15 Volume 1 - 187 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Supersonic Targets MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Gross/Weapon System Cost (†) - FY 2025 Total Cost Qty (Each) ($ M) - 1,087.425 Unit Cost ($ K) - FY 2026 Total Cost Qty (Each) ($ M) - 83.465 Unit Cost ($ K) - FY 2027 Base Total Cost Qty (Each) ($ M) - 84.689 Unit Cost ($ K) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 74.988 Unit Cost ($ K) - FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($ K) - Total Cost Qty (Each) ($ M) - 74.988 indicates the presence of a P-5a Footnotes: (21) EM203 GQM-163A: FY 2027 is to be awarded as an option on the new FRP 18-20 contract. Unit cost increase from FY 2026 to FY 2027 is attributed to the incorporation of production related engineering changes, material cost increases, lower quantity procurement and anticipated inflation. Funding includes the procurement of GQM-163A targets for the Commander, SIXTH Fleet, Formidable Shield / Maritime Theater Missile Defense Forum at Sea Demonstration in support of advancing U.S. and NATO Integrated Air and Missile Defense maritime force interoperability and readiness. (22) (23) EM204 GQM-163A Boosters are broken out separately as they are not produced by the OEM and are contracted via different activities. EM442 Install/Mission Kits: Mission kit quantities vary depending on acquisition program test and evaluation and fleet training presentation requirements and are not procured on a one for one basis with air vehicle quantities. Kit procurements are based on a projection of the user demand and mission profiles required for specific test objectives. Each type of kit is priced differently so the total costs of the kits is not a direct reflection on the quantity of kits being procured. The varying demand and cost of the mission kits accounts for the increases and decreases of this cost element from year to year. (24) EM443 Hardware Procurements / Modifications support engineering changes and other modifications necessary to ensure supersonic targets keep pace with emerging threats. The focus throughout the FYDP for the Supersonic targets is target capability improvements to include non-recurring engineering (NRE) efforts in support of the MK70 booster replacement as well as performance enhancements that include higher dive angle of 80 degrees and terminal maneuvers greater than 12G. Increases across FY2027 - FY2030 include booster NRE, performance enhancement NRE, and NRE related to the qualification of additional material sources and additional supersonic target alternatives. (25) EM444 AQM-88 Supersonic Air Launch Target (SALT) Modification: Funds the modification of existing AGM-88 HARM missile into inert aerial targets to simulate supersonic Anti-Ship Cruise Missile (ASCM) threats. AQM-88 SALT provides an affordable supersonic target to exercise fleet operators in tactics, techniques and procedures against a supersonic threat. (26) EM702 Ground Equipment: Funds peculiar support equipment (PSE) including a dedicated flyaway kit, modified loader carts and flight presentation consumables to support multiple concurrent launch operations. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 14 of 25 P-1 Line #15 Volume 1 - 188 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements FY Contractor and Location 2020 NORTHROP GRUMMAN INNOVATION SYSTEMS SS / FFP NAVAIR Nov 2020 Dec 2024 16 3,005.085 Y Aug 2019 2021 NORTHROP GRUMMAN INNOVATION SYSTEMS SS / FFP NAVAIR Feb 2021 Sep 2025 14 3,081.467 Y Aug 2019 SS / FFP NAVAIR Oct 2022 Apr 2027 10 2,831.386 Y Aug 2019 SS / FFP NAVAIR Oct 2022 Aug 2027 18 2,831.386 Y Aug 2019 SS / FFP NAVAIR Apr 2024 Apr 2028 16 3,259.076 Y Aug 2019 SS / FFP NAVAIR Mar 2026 Mar 2029 13 4,509.538 Y Jun 2024 SS / FFP NAVAIR Mar 2026 Mar 2029 13 4,509.538 Y Jun 2024 SS / FFP NAVAIR Mar 2027 Mar 2030 10 5,502.900 Y Jun 2024 (†) 1.1.1) EM203 GQM-163A (†) 1.1.1) EM203 GQM-163A 2022 (28) 2023 (29) 2024 (†) 1.1.1) EM203 GQM-163A 2025 (30) 2026 (31) 2027 (32) (†) / CHANDLER AZ / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS (27) / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS (27) (†) 1.1.1) EM203 GQM-163A / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS (27) (†) 1.1.1) EM203 GQM-163A (27) (27) (†) 1.1.1) EM203 GQM-163A (27) (27) (†) 1.1.1) EM203 GQM-163A Item Number / Title [DODIC]: 2 / Supersonic Targets Method/Type or Funding Vehicle (†) 1.1.1) EM203 GQM-163A P-1 Line Item Number / Title: 2280 / Aerial Targets / CHANDLER AZ NORTHROP GRUMMAN INNOVATION SYSTEMS (27) / CHANDLER AZ Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (27) The maximum production rate is currently limited to 28 units due to the availability of Government Furnished Property (GFP) and OEM limitations. The program is exploring GFP alternatives in order to increase the maximum procurement rate per year. (28) (29) (30) (31) (32) FRP 16 combined FY 2022/23 funding in a single full-rate production award. FRP 16 combined FY 2022/23 funding in a single full-rate production award. FRP 18 combines FY25/FY26 funding in a single full-rate production award on a new contract. The combined buy is to achieve economy of scale pricing and strengthen industrial base. FRP 18 combines FY25/FY26 funding in a single full-rate production award on a new contract. The combined buy is to achieve economy of scale pricing and strengthen industrial base. FRP 19 will be a new contract. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 15 of 25 P-1 Line #15 Volume 1 - 189 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 0 16 A - - - - - - - - - - - - - - - - - - - - - - - 3 0 3 A - - - - - - - - - - - - - - - - - - - - - - - FMS 1 2020 Total 3 19 0 19 - - - - - - - - - - - - - - - - - - - - - - - 19 1 2021 NAVY 1 2021 FMS 14 0 14 A - - - - - - - - - - - - - - - - - - - - 14 4 0 4 A - - - - - - - - - - - - - - - - - - - - 1 2021 4 Total 18 0 18 - - - - - - - - - - - - - - - - - - - - 18 1 1 2022 NAVY 10 0 10 10 2023 NAVY 18 0 18 18 1 2024 NAVY 16 0 16 16 1 2025 NAVY 13 0 13 13 1 2025 FMS 1 0 1 1 1 2025 Total 14 0 14 14 1 2026 NAVY 13 0 13 13 1 2026 FMS 1 0 1 1 1 2026 Total 14 0 14 14 1 2027 NAVY 10 0 10 10 1 2027 FMS 1 0 1 1 1 2027 Total 11 0 11 11 (‡) (‡) (‡) (‡) (‡) O C T LI 2280 - Aerial Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G 16 S E P Volume 1 - 190 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 0 16 - - - - - - - - - - - - - - - - - - - - - - - - 3 0 3 - - - - - - - - - - - - - - - - - - - - - - - - FMS 1 2020 Total 3 19 0 19 - - - - - - - - - - - - - - - - - - - - - - - - 19 1 2021 NAVY 1 2021 FMS 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 4 0 4 - - - - - - - - - - - - - - - - - - - - - - - - 1 2021 4 Total 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 1 1 2022 NAVY 10 0 10 A - - - - - - - - - - - - - - - - - - - - - - - - 10 2023 NAVY 18 0 18 A - - - - - - - - - - - - - - - - - - - - - - - - 18 1 2024 NAVY 16 0 16 A - - - - - - 16 1 2025 NAVY 13 0 13 1 2025 FMS 1 0 1 1 1 2025 Total 14 0 14 14 1 2026 NAVY 13 0 13 13 1 2026 FMS 1 0 1 1 1 2026 Total 14 0 14 14 1 2027 NAVY 10 0 10 10 1 2027 FMS 1 0 1 1 1 2027 Total 11 0 11 11 (‡) (‡) (‡) (‡) (‡) 13 O C T LI 2280 - Aerial Targets Navy 16 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 191 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 0 16 - - 3 0 3 - - FMS 1 2020 Total 19 0 19 - - 1 2021 NAVY 14 0 14 - - - - - 1 2021 FMS 4 0 4 - - - - 1 2021 Total 18 0 18 - - - 1 2022 NAVY 10 0 10 - - 1 2023 NAVY 18 0 18 - 1 2024 NAVY 16 0 16 - 1 2025 NAVY 13 0 1 2025 FMS 1 1 2025 Total 1 2026 NAVY 1 2026 FMS 1 2026 Total 1 2027 NAVY 1 2027 FMS 1 2027 Total (‡) (‡) (‡) (‡) (‡) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 A - - - 0 1 A - - 14 0 14 - 13 0 13 1 0 1 14 0 14 10 0 10 1 0 1 1 11 0 11 11 - 2 2 1 - - 2 1 2 1 - 1 2 4 1 1 1 1 - 1 - - 4 1 1 1 2 2 2 1 - 2 2 - - - - - - - 2 - 1 - - - - 2 - 1 2 - 1 2 - 1 1 2 1 1 1 - 2 - 1 2 - 0 0 - - - 0 - 0 1 2 1 1 2 1 0 - 0 - - 10 - - - 18 - - - 16 - - - - 13 - - - - - 1 - - - - - - 14 A - - - - - - - 13 A - - - - - - - 1 - - - - - - - 14 10 O C T LI 2280 - Aerial Targets Navy 2 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 192 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 16 0 3 3 0 FMS 1 2020 Total 19 19 0 1 2021 NAVY 14 14 0 1 2021 FMS 4 4 0 1 2021 Total 18 18 0 - - - - - - 1 2022 NAVY 10 0 10 - - - - - - 1 2023 NAVY 18 0 18 - - - - - - - - - - 1 2024 NAVY 16 0 16 - - - - - - - - - - - - - - - - - - 1 2025 NAVY 13 0 13 - - - - - - - - - - - - - - - - - - - - - - - - 1 2025 FMS 1 2025 Total 1 2026 NAVY 1 2026 FMS 1 2026 Total 1 2027 NAVY 1 2027 FMS 1 2027 Total (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - 3 2 2 - - - - - - - - - - - - - - 0 3 0 2 3 3 2 2 2 2 2 0 2 - 2 1 2 2 7 13 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 13 0 13 - - - - - - - - - - - - - - - - - - - - - - - - 13 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 10 0 10 A - - - - - - - - - - - - - - - - - - - 10 1 0 1 A - - - - - - - - - - - - - - - - - - - 1 11 0 11 - - - - - - - - - - - - - - - - - - - 11 O C T LI 2280 - Aerial Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 193 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 16 0 3 3 0 FMS 1 2020 Total 19 19 0 1 2021 NAVY 14 14 0 1 2021 FMS 4 4 0 1 2021 Total 18 18 0 1 2022 NAVY 10 10 0 1 2023 NAVY 18 18 0 1 2024 NAVY 16 9 7 1 2025 NAVY 13 0 13 - - - - - 1 2025 FMS 1 0 1 - - - - - 1 2025 Total 14 0 14 - - - - - 1 2 1 1 1 1 1 1 1 1 1 2 1 2026 NAVY 13 0 13 - - - - - 1 1 2 1 1 1 1 1 1 1 1 1 1 2026 FMS 1 0 1 - - - - - 1 2026 Total 14 0 14 - - - - - 1 2027 NAVY 10 0 10 - - - - - - - - - - - - - - - - - 1 2027 FMS 1 0 1 - - - - - - - - - - - - - - - - - 1 2027 Total 11 0 11 - - - - - - - - - - - - - - - - - (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 3 O C T LI 2280 - Aerial Targets Navy - 2 N O V 2 D E C 0 J A N F E B 1 2 - - - A U G UNCLASSIFIED 0 - - - - - - - 0 0 1 J A N 0 1 1 D E C 1 - 1 N O V 1 - 1 O C T 1 - 1 S E P 1 - - 2 Page 20 of 25 1 - 1 1 J U L 1 - 1 J U N 1 - 2 M A Y 1 - 1 A P R 1 - 1 M A R 1 0 1 F E B P-1 Line #15 - 1 1 - - 2 A U G 0 1 1 1 J U L 1 1 J U N 1 1 M A Y 1 1 A P R 1 1 M A R - 3 0 1 S E P Volume 1 - 194 3 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) EM203 GQM-163A PROC QTY Item Number / Title [DODIC]: 2 / Supersonic Targets Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (21) Prior Years Deliveries: 140 1 2020 1 2020 NAVY 16 16 0 3 3 0 FMS 1 2020 Total 19 19 0 1 2021 NAVY 14 14 0 1 2021 FMS 4 4 0 1 2021 Total 18 18 0 1 2022 NAVY 10 10 0 0 1 2023 NAVY 18 18 0 0 1 2024 NAVY 16 16 0 0 1 2025 NAVY 13 13 0 0 1 2025 FMS 1 1 0 1 2025 Total 14 14 0 1 2026 NAVY 13 13 0 1 2026 FMS 1 1 0 1 2026 Total 14 14 0 1 2027 NAVY 10 7 3 1 2027 FMS 1 1 0 1 2027 Total 11 8 3 (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - 1 1 - - - - - - - - - - - - - - - - - - - - - 0 1 D E C 0 0 1 N O V 1 1 O C T LI 2280 - Aerial Targets Navy - J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 195 0 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 2 / Supersonic Targets Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN INNOVATION SYSTEMS - CHANDLER AZ (27) MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 6 21 28 14 ALT After Oct 1 Reorder Manufacturing PLT 3 36 Total After Oct 1 ALT Prior to Oct 1 39 ALT After Oct 1 0 Manufacturing PLT 2 Total After Oct 1 36 38 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (27) The maximum production rate is currently limited to 28 units due to the availability of Government Furnished Property (GFP) and OEM limitations. The program is exploring GFP alternatives in order to increase the maximum procurement rate per year. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 22 of 25 P-1 Line #15 Volume 1 - 196 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Full Scale Aerial Target MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 9.688 0.000 0.000 0.000 0.000 0.000 - - - - - - 9.688 0.000 0.000 0.000 0.000 0.000 - - - - - - 9.688 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Hardware Cost Recurring Cost 1.1.2) EMA12 QF-16 - - 8.583 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 8.583 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 8.583 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1) EM890 Production Management - - 0.227 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) EM855 Engineering Support - - 0.878 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Production Support Cost - - 1.105 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 9.688 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 FSAT Hardware (33) Subtotal: Recurring Cost Subtotal: Flyaway Hardware Cost Support - Production Support Cost Footnotes: (33) EMA12 QF-16 FSAT Hardware: QF-16 production for the Navy ended in FY 2024. The USAF, as the lead service for the FSAT, is evaluating options for the next generation FSAT. Final aircraft delivered and support moved to sustainment. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 23 of 25 P-1 Line #15 Volume 1 - 197 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / Target Aug/Aux System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 21.932 21.905 27.048 0.000 27.048 - Gross/Weapon System Cost ($ in Millions) 2,619.878 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 2,619.878 Plus CY Advance Procurement ($ in Millions) - - - - - 21.932 21.905 27.048 0.000 27.048 - Total Obligation Authority ($ in Millions) 2,619.878 FY 2027 Total - - - - - 21.932 21.905 27.048 0.000 27.048 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Aux/Aug Sys Targets Hardware Cost Recurring Cost 1.1.1) EM304 ECM/ - - 133.527 - - 8.410 - - 8.389 - - 10.867 - - 0.000 - - 10.867 - - 79.850 - - 8.314 - - 8.294 - - 10.768 - - 0.000 - - 10.768 Subtotal: Recurring Cost - - 213.377 - - 16.724 - - 16.683 - - 21.635 - - 0.000 - - 21.635 Subtotal: Flyaway - Aux/Aug Sys Targets Hardware Cost - - 213.377 - - 16.724 - - 16.683 - - 21.635 - - 0.000 - - 21.635 Emitter Equipment (34) 1.1.2) EM307 Target Common Avionics Equipment (35) Flyaway - Aux/Aug Sys Targets FY 2006 and PRIOR Cost Non Recurring Cost 2.1.1) Prior Year Costs No Longer Procured - - 2,327.189 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 2,327.189 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway - Aux/Aug Sys Targets FY 2006 and PRIOR Cost - - 2,327.189 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - Aux/Aug Sys Targets Support Cost 3.1) EM823 Training Equipment - - 3.358 - - 0.216 - - 0.219 - - 0.218 - - 0.000 - - 0.218 3.2) EM853 Production Engineering Support - - 61.157 - - 4.004 - - 4.006 - - 4.197 - - 0.000 - - 4.197 LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 24 of 25 P-1 Line #15 Volume 1 - 198 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2280 / Aerial Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / Target Aug/Aux System MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 3.3) EM863 Integrated Logistics Support (ILS) - - 12.919 - - 0.904 - - 0.913 - - 0.914 - - 0.000 - - 0.914 3.4) EM873 Documentation - - 1.878 - - 0.084 - - 0.084 - - 0.084 - - 0.000 - - 0.084 Subtotal: Support - Aux/Aug Sys Targets Support Cost - - 79.312 - - 5.208 - - 5.222 - - 5.413 - - 0.000 - - 5.413 Gross/Weapon System Cost - - 2,619.878 - - 21.932 - - 21.905 - - 27.048 - - 0.000 - - 27.048 Footnotes: (34) EM304 ECM/Emitter Equipment to support Operational requirements of Target Threat Simulation Program (TTSP) to ensure Fleet readiness in keeping pace with emerging threats. Payload procurement supports AEGIS CG and DDG Mods, DDG-51 Flight III, LHA 8, CVN 79, LPD Flight II, SSDS Combat System, Standard Missile 2, 6, RAM and ESSM). Funding increases from FY 2026 to FY 2027 to support projected target testing and presentation needs for multiple joint events, including RIMPAC and UNITAS. (35) EM307 Target Common Avionics Equipment supports Target Mission Support Systems (TMSS) to deliver high interest Fleet training. Funds upgrades for the System for Navy Target Control (SNTC) due to obsolescence issues which impacts the fleet's ability to successfully test the effectiveness of ship defense. Upgrades enable increased reporting rate and accuracy of tracking for targets on the ranges to enable closer flight of targets to test close-in weapons systems safely. Funding increases from FY 2026 to FY 2027 to support projected target testing and presentation needs for multiple joint events, including RIMPAC and UNITAS. LI 2280 - Aerial Targets Navy UNCLASSIFIED Page 25 of 25 P-1 Line #15 Volume 1 - 199 === page 240 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 200 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2290 / Other Missile Support Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 78.144 3.411 3.490 3.877 0.000 3.877 3.872 3.866 3.937 4.017 - - - - - - - - - - - - 78.144 3.411 3.490 3.877 0.000 3.877 3.872 3.866 3.937 4.017 - - - - - - - - - - - - 78.144 3.411 3.490 3.877 0.000 3.877 3.872 3.866 3.937 4.017 - Total 104.614 104.614 104.614 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The MK-41 Vertical Launching System (VLS) is a surface combatant missile launching system designed to store, select, and launch various Standard Missile configurations, Tomahawk, Tactical Tomahawk (TACTOM), Evolved SeaSparrow (ESSM) and Vertical Launch Anti-Submarine Rocket (ASROC) (VLA) missiles. The MK-41 VLS significantly improves missile capacity, flexibility, multi-mission capability, reaction time, rate of fire, and is designed to be adaptable to present and future weapon systems. Current configurations are: two 61 cell launchers (forward and aft) for 9 TICONDEROGA (CG 47) Class Cruisers beginning with CG-52, one 61-cell aft and one 29-cell launcher forward for 28 ARLEIGH BURKE (DDG 51) Class Destroyers, one 64-cell launcher aft and one 32-cell launcher forward for 46 DDG 51 FLT IIA ships. LI 2290 - Other Missile Support Navy UNCLASSIFIED Page 1 of 3 P-1 Line #16 Volume 1 - 201 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2290 / Other Missile Support Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Other Missile Support - / 78.144 - / 3.411 - / 3.490 - / 3.877 - / 0.000 - / 3.877 P-40 Total Gross/Weapon System Cost - / 78.144 - / 3.411 - / 3.490 - / 3.877 - / 0.000 - / 3.877 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds are required for production support and Integrated Logistics Support (ILS) including: supply support, provisioning and technical documentation in support of weapon stations, All Up Round (AUR) facilities, and the fleet. Funds also provide for development and procurement of critical Engineering Change Proposals (ECP) and Ordnance Alterations (ORDALT) that improve reliability and implement safety upgrades for MK-41 VLS canisters and gas management hardware. Availability of upgraded canisters, canister hardware, and gas management hardware directly impacts fleet loadouts, operational availability, and safety. LI 2290 - Other Missile Support Navy UNCLASSIFIED Page 2 of 3 P-1 Line #16 Volume 1 - 202 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2290 / Other Missile Support Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Other Missile Support MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 78.144 3.411 3.490 3.877 0.000 3.877 - - - - - - 78.144 3.411 3.490 3.877 0.000 3.877 - - - - - - 78.144 3.411 3.490 3.877 0.000 3.877 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) CANISTER EQUIPMENT (1) Subtotal: Recurring Cost Subtotal: Flyaway Cost - - 56.409 - - 1.468 - - 1.480 - - 1.639 - - - - - 1.639 - - 56.409 - - 1.468 - - 1.480 - - 1.639 - - - - - 1.639 - - 56.409 - - 1.468 - - 1.480 - - 1.639 - - - - - 1.639 Support Cost 2.1) ILS SUPPORT - - 21.735 - - 1.943 - - 2.010 - - 2.238 - - - - - 2.238 Subtotal: Support Cost - - 21.735 - - 1.943 - - 2.010 - - 2.238 - - - - - 2.238 Gross/Weapon System Cost - - 78.144 - - 3.411 - - 3.490 - - 3.877 - - 0.000 - - 3.877 Footnotes: (1) Canister Equipment - Funds procurement and installation of canister and gas management hardware Engineering Change Proposals (ECPs) and Ordnance Alterations (ORDALTs). LI 2290 - Other Missile Support Navy UNCLASSIFIED Page 3 of 3 P-1 Line #16 Volume 1 - 203 === page 244 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 204 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204167N Other Related Program Elements: 0604786N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 347 164 136 129 - 129 164 168 169 178 - 1,455 1,498.122 597.530 656.724 670.456 670.456 844.558 872.355 880.239 931.882 - 6,951.866 1,498.122 1,498.122 597.530 597.530 656.724 656.724 - 0.000 - 670.456 - 0.000 - 670.456 0.000 670.456 670.456 844.558 844.558 872.355 872.355 880.239 880.239 To FY 2031 Complete 931.882 931.882 Total - 6,951.866 - - - 6,951.866 19.304 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - - 4.081 3.470 - 3.470 3.552 4.118 4.083 - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - 0.00 4,317K 3,643K 4,829K 5,197K - 5,197K 5,150K 5,193K 5,209K 5,235K - 4,778K Description: Long Range Anti-Ship Missile (LRASM) is Increment 1 of the Offensive Anti-Surface Warfare (OASuW) weapon development program. LRASM (AGM-158C) is a key air launched component of the Navy's overall Cruise Missile Strategy. The Department has transitioned the Defense Advanced Research Projects Agency (DARPA) / Office of Naval Research (ONR) LRASM demonstration design into a fielded weapon system which supports an increased offensive strike capability with an Early Operational Capability (EOC) for U.S. Air Force B-1 (Q1 FY 2019) and U.S. Navy F/A-18E/F (Q1 FY 2020). In response to U.S. Pacific Command Urgent Operation Need (UON) statement, LRASM provides the first increment of the next generation ASuW capabilities addressing the most urgent air-launched requirement, significantly reducing joint force warfighting risks, and positioning the Department to address evolving surface warfare threats. LRASM is integral to realizing the National Defense Strategic Guidance of combat-credible military forces to deter war, protect the security of our nation and to enable the Joint Force to win should deterrence fail. The development and acquisition of LRASM has been structured to be fielded at a pace relevant to maintain overmatch against long-term strategic competition. Specifically, LRASM directly contributes to building a more lethal force and is a critical enabler for joint lethality in contested environments; deterring adversaries from aggression; ensuring common domains remain open and maintaining favorable regional balances of power. LRASM shares a production line with the U.S. Air Force Joint Air-toSurface Standoff Missile (JASSM). The Navy and Air Force jointly procure LRASMs via an Air Force contract that benefits from cost savings when aligned with JASSM procurements. The FY 2027 budget request continues to support the Multiyear Procurement (MYP) strategy for JASSM; LRASM; and Naval Strike Missile, under the Large Lot Procurement (LLP) concept in which individual MYPs would be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in greater production capacity, accelerated delivery, and lower unit costs. LLP represents an evolution of the existing MYP contracting and financing strategy, that leverages the savings generated through the use of Economic Order Quantities (EOQ) financing to procure additional lots of missiles under a Buy-to-Budget concept, to further improve efficiencies and yields. U.S. Navy will procure the LRASM C-3, an AGM-158C derived capability, to enhance long range strike and existing Offensive Anti-Surface Warfare (OASuW) capability. The LRASM C-3 is a forward fit ECP to the LRASM baseline program. The program is aligning LRASM C-1 and LRASM C-3 as major subprograms underneath the OASuW Increment I acquisition category IC (ACAT IC) program. The LRASM C-1 program will consist of the legacy LRASM C and LRASM C-1 weapons currently fielded and approaching production completion. The LRASM C-3 subprogram is a modification to the LRASM C-1 weapon system that is required to be developed and produced to compete with near-peer threats. FY 2026 concludes the procurement of the LRASM AGM-158C-1 variant, with the full transition to the LRASM AGM-158C-3 procurements starting in FY 2027. Non-recurring engineering, involving adapting strike software, Beyond Line of Sight (BLOS) radio integration, mission planning software development, survivability and platform integration, are funded in PE 0604786N OASuW Development PU 3337 & PU 3466. The hardware baseline is adapted from the LRASM (AGM-158C family) production line with modifications for extended range and new systems. The LI 2291 - LRASM Navy UNCLASSIFIED Page 1 of 20 P-1 Line #17 Volume 1 - 205 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2291 / LRASM Program Elements for Code B Items: 0204167N Other Related Program Elements: 0604786N Line Item MDAP/MAIS Code: N/A software activity funded in RDT&E,N will leverage the LRASM 1.1/C-1 software baseline, and focus on combining the C++ software, JASSM-ER range and strike capability, BLOS Weapons Data Link, advanced survivability, and LRASM OASuW capabilities into a Navy LRASM C-3 baseline. Future efforts will expand both Navy strike and OASuW capabilities within this program. The FY 2026 request for LRASM includes $656,724 thousand of discretionary and $350,000 thousand of mandatory (reconciliation) for a total of $1,006,724 thousand. FY 2026 total funding supports the procurement and production support of LRASM C-1 and LRASM C-3 AUR and production support of each. The mandatory funds will be utilized for procurement of LRASM AUR & supporting radios (estimated 54 units) as well as production capacity expansion for LRASM (from 240 to 320 per year). The FY 2027 request for LRASM includes $670,456 thousand of discretionary and $236,389 thousand of mandatory (reconciliation) for a total of $906,845 thousand. FY 2027 total funding supports the procurement and production support of LRASM C-3 AUR. The discretionary funds provide for LRASM C-3 AUR and all other production supporting efforts. The mandatory funds provide for the procurement of LRASM C-3 AUR & supporting radios only (estimated 48 units). LRASM Inventory Objective held at higher classification. LI 2291 - LRASM Navy UNCLASSIFIED Page 2 of 20 P-1 Line #17 Volume 1 - 206 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204167N Other Related Program Elements: 0604786N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 1 / LRASM C-1 P-5a, P-21 P-5 2 / LRASM C-3 P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,442.441 - / 264.873 - / 58.716 / 55.681 - / 332.657 - / 598.008 347 / 1,498.122 164 / 597.530 136 / 656.724 - / 0.000 - / 0.000 / 670.456 - / 0.000 - 129 / 670.456 - / 0.000 129 / 670.456 - - / 0.000 / 670.456 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding procures a total of 129 LRASM C-3 AUR. FY 2027 is the third order year to procure quantities under the Multiyear Procurement (MYP) contract. FY 2027 funds effort associated with satisfying Congressionally directed Operational Testing, which includes telemetry kit installations and test support. FY 2027 reflects the latest cost estimate for the procurement of an AGM-158 variant that provides the C++ software, BLOS Weapons Data Link, advanced survivability, and the JASSM-ER range and strike capability. The FY 2027 request for LRASM includes $670,456 thousand of discretionary and $236,389 thousand of mandatory (reconciliation) for a total of $906,845 thousand. LI 2291 - LRASM Navy UNCLASSIFIED Page 3 of 20 P-1 Line #17 Volume 1 - 207 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LRASM C-1 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 1,442.441 Less PY Advance Procurement ($ in Millions) 264.873 - Net Procurement (P-1) ($ in Millions) 264.873 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 58.716 0.000 0.000 0.000 - 1,442.441 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - - - - 58.716 0.000 0.000 0.000 - 1,442.441 264.873 FY 2027 Total - - - - 58.716 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - LRASM C-1 Cost Recurring Cost 1.1.1) LRASM C-1 All 1,047.591 1,719K 60 103.150 1,131K 30 33.920 - - 0.000 - - 0.000 - - 0.000 - 0.000 3,079K 33 101.605 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3,079K 11 33.868 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) Containers - - 1.230 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Contractor ECO - - 1.425 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) Economic Order Quantity (EOQ) - - 235.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1,285.246 - - 238.623 - - 33.920 - - 0.000 - - 0.000 - - 0.000 - - 1,285.246 - - 238.623 - - 33.920 - - 0.000 - - 0.000 - - 0.000 Up Round (AUR) (†) (1) 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/ Supplemental 3,109K 337 - (†) (2) Ukraine) 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/ Supplemental Israel) (†) (3) Subtotal: Hardware LRASM C-1 Cost Hardware - Nonrecurring and Ancillary Equip Cost Non Recurring Cost 2.1.1) Obsolescence - - 3.988 - - 1.555 - - 0.929 - - 0.000 - - 0.000 - - 0.000 2.1.2) Tooling - - 8.952 - - 12.077 - - 14.608 - - 0.000 - - 0.000 - - 0.000 LI 2291 - LRASM Navy UNCLASSIFIED Page 4 of 20 P-1 Line #17 Volume 1 - 208 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LRASM C-1 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) 2.1.3) Telemetry Kits - - 2.1.4) Production Modifications - 2.1.5) N/R ECP - 2.1.6) Defense Industrial Base Facilitization Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 15.585 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 9.188 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 16.385 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 53.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 107.098 - - 13.632 - - 15.537 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware Nonrecurring and Ancillary Equip Cost - - 107.098 - - 13.632 - - 15.537 - - 0.000 - - 0.000 - - 0.000 3.1) Production Support - - 18.680 - - 7.903 - - 5.100 - - 0.000 - - 0.000 - - 0.000 3.2) LRASM Operational Test Support - - 28.765 - - 4.715 - - 4.159 - - 0.000 - - 0.000 - - 0.000 3.3) LRASM Telemetry Kit Integration Support Cost - - 2.652 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Cost - - 50.097 - - 12.618 - - 9.259 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 1,442.441 - - 264.873 - - 58.716 - - 0.000 - - 0.000 - - 0.000 (†) indicates the presence of a P-5a Footnotes: (1) 1.1.1 AUR: The program transitions to solely the LRASM AGM-158C-3 variant procurement in FY 2027. Unit costs differ between baseline budget and Supplemental/Tranche procurement due to application of EOQ funding towards AUR units on the contract. FY 2025 and FY 2026 unit cost for baseline includes utilization of EOQ funding. (2) (3) 1.1.2: Supplemental Ukraine Tranche-28 funding received for procurement of 33 LRASM C-1 AUR. Awarded as a part of Lot 8b, March 2025. 1.1.3: Supplemental Israel Tranche-6 funding received for procurement of 11 LRASM C-1 AUR. Awarded as a part of Lot 8b, July 2025. LI 2291 - LRASM Navy UNCLASSIFIED Page 5 of 20 P-1 Line #17 Volume 1 - 209 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements 1.1.1) LRASM C-1 All Up Round (†) (AUR) 1.1.1) LRASM C-1 All Up Round (†) (AUR) 1.1.1) LRASM C-1 All Up Round (†) (AUR) 1.1.1) LRASM C-1 All Up Round (†) (AUR) 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental (†) Ukraine) 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental (†) Israel) (†) O O C FY Contractor and Location P-1 Line Item Number / Title: 2291 / LRASM Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / LRASM C-1 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2023 (4) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB May 2023 Jun 2025 66 2,880K Y Mar 2022 2024 (5) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB Nov 2023 May 2026 81 2,880K Y Mar 2023 2025 (6) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB Mar 2025 Jan 2028 60 1,719K Y Mar 2024 2026 (7) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB Mar 2026 Mar 2029 30 1,131K Y Mar 2025 2025 (8) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB Mar 2025 Apr 2027 33 3,079K Y Mar 2024 2025 (9) Lockheed Martin Missiles and Fire Control / Orlando, FL SS / FFP Eglin AFB Jul 2025 Jun 2027 11 3,079K Y Mar 2024 indicates the presence of a P-21 Footnotes: (4) (5) (6) Award date represents both U.S. Air Force and U.S. Navy procurements Award date represents both U.S. Air Force and U.S. Navy procurements. Award date represents both U.S. Air Force and U.S. Navy procurements. FY 2025 will be the first year quantity procurements on the Multi-Year Procurement (MYP) contract for LRASM; the MYP will go from FY 2025 - FY 2028 (Lots 9 12). (7) (8) (9) The current Maximum Annual Production Rate for LRASM is 320. Award date represents both U.S. Air Force and U.S. Navy procurements Supplemental Ukraine Tranche-28 funding for LRASM C-1 AURs - Awarded March 2025 as part of Lot 8b Supplemental Israel Tranche-6 funding for LRASM C-1 AURs - Awarded July 2025 as part of Lot 8b LI 2291 - LRASM Navy UNCLASSIFIED Page 6 of 20 P-1 Line #17 Volume 1 - 210 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LRASM C-1 Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) LRASM C-1 All Up Round (AUR) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 190 (10) 0 66 A - - - - - - - - - - - - - - - - - 66 71 0 71 A - - - - - - - - - - - - - - - - - 71 2 0 2 A - - - - - - - - - - - - - - - - - 2 139 0 139 - - - - - - - - - - - - - - - - - 139 (11) 0 81 A - - - - - - - - - - - 81 95 0 95 A - - - - - - - - - - - 95 176 0 176 - - - - - - - - - - - 176 (12) 0 60 60 143 0 143 143 203 0 203 203 (13) 0 30 30 2026 AF (‡) 62 0 62 62 2026 Total 92 0 92 1 2023 NAVY 1 2023 AF 1 2023 FMS 1 2023 Total 1 2024 NAVY 1 2024 AF (‡) 1 2024 Total 1 2025 NAVY 1 2025 AF (‡) 1 2025 Total 1 2026 NAVY 1 1 66 (‡) (‡) 81 60 30 92 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Ukraine) 2 2025 NAVY 33 0 33 33 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Israel) 3 2025 NAVY 11 0 (3) 11 11 O C T LI 2291 - LRASM Navy (2) N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 211 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LRASM C-1 Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) LRASM C-1 All Up Round (AUR) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 190 (10) 0 66 - - - - - - - - 71 0 71 - - - - - - - - - 2 0 2 - - - - - - - - - 139 0 139 - - - - - - - - (11) 0 81 - - - - - - - - - - - - (‡) 95 0 95 - - - - - - - - - - - Total 176 0 176 - - - - - - - - - - - (12) 0 60 A - - - - - 143 0 143 A - - - - 203 0 203 - - - - (13) 0 2026 AF (‡) 62 2026 Total 92 1 2023 NAVY 1 2023 AF 1 2023 FMS 1 2023 Total 1 2024 NAVY 1 2024 AF 1 2024 1 2025 NAVY 1 2025 AF (‡) 1 2025 Total 1 2026 NAVY 1 1 66 (‡) (‡) 81 60 30 10 10 10 - - - - - - - - - - - - 10 10 10 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 60 - - - - - - - - - - - - - - - 143 - - - - - - - - - - - - - - - 203 30 A - - - - - - - 30 0 62 A - - - - - - - 62 0 92 - - - - - - - 92 - - - - - - - 33 - 11 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Ukraine) 2 2025 NAVY 33 0 3 2025 NAVY 11 0 A - 9 2 1 10 9 9 9 9 9 - 4 6 - 4 8 6 8 8 9 9 - 9 - 0 9 - 9 - 0 8 9 9 9 9 9 6 6 6 6 6 51 6 146 - 6 6 6 6 95 - - - - - - - - - - - (3) 11 A O C T LI 2291 - LRASM Navy 8 - (2) 33 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Israel) 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 212 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LRASM C-1 Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) LRASM C-1 All Up Round (AUR) Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 190 (10) 66 0 71 62 9 2 2 0 139 130 9 9 (11) 30 51 6 (‡) 95 0 95 2024 Total 176 30 146 1 2025 NAVY (12) 0 60 1 2025 AF (‡) 143 0 1 2025 Total 203 0 1 2026 NAVY (13) 1 2026 AF (‡) 1 2026 Total 1 2023 NAVY 1 2023 AF 1 2023 FMS 1 2023 Total 1 2024 NAVY 1 2024 AF 1 66 (‡) (‡) 81 60 30 - 0 9 0 - 0 - 2025 NAVY 2025 NAVY - - - - - - - - - - - - - - - - - - - 8 8 8 5 - - 5 5 5 5 5 2 - - 6 14 14 12 12 10 13 13 13 13 13 7 - - 6 14 14 12 12 10 - - - - - - - - - - - - - - - 143 - - - - - - - - - - - - - - - 9 9 203 - - - - - - - - - - - - - - - 14 14 0 30 - - - - - - - - - - - - - - - - - 62 0 62 - - - - - - - - - - - - - - - - 92 0 92 - - - - - - - - - - - - - - - - - - - - 14 11 6 33 0 33 - 11 0 11 - - - - - - 0 0 0 - 5 5 5 - - 5 5 9 9 14 14 - - - - - 5 5 5 10 9 10 15 14 15 - - - - - - - - - 0 5 15 10 9 59 15 14 74 - - - 30 - - - - 62 - - - - 92 (2) - 8 0 (3) O C T LI 2291 - LRASM Navy - 8 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Israel) 3 - 8 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Ukraine) 2 - N O V D E C J A N F E B M A R A P R M A Y 3 J U N 8 J U L 0 A U G UNCLASSIFIED Page 9 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 213 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LRASM C-1 Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) LRASM C-1 All Up Round (AUR) Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 190 (10) 66 0 0 71 71 0 0 2 2 0 139 139 0 (11) 81 0 (‡) 95 95 0 2024 Total 176 176 0 2025 NAVY (12) 45 15 5 5 1 2025 AF (‡) 143 84 59 10 1 2025 Total 203 129 74 15 1 2026 NAVY (13) 0 30 1 2026 AF (‡) 62 0 1 2026 Total 92 0 1 2023 NAVY 1 2023 AF 1 2023 FMS 1 2023 Total 1 2024 NAVY 1 2024 AF 1 1 66 (‡) (‡) 81 60 30 0 - - 2025 NAVY 33 33 2025 NAVY 11 11 - - - - - - - - - - - - - - - 5 - - 10 9 15 15 15 14 15 15 - - - - - 3 2 3 2 3 2 3 2 3 2 3 2 62 - - - - - 5 5 5 5 5 5 5 5 5 5 6 6 92 - - - - - 8 7 8 7 8 7 8 7 8 7 9 8 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - 0 (2) 0 0 (3) 0 0 O C T LI 2291 - LRASM Navy - 0 - 1.1.3) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Israel) 3 - 0 1.1.2) LRASM C-1 All Up Round (AUR) (Tranche/Supplemental Ukraine) 2 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 214 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / LRASM C-1 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin Missiles and Fire Control - Orlando, FL 60 110 320 0 2 26 28 0 6 29 35 2 Lockheed Martin Missiles and Fire Control - Orlando, FL 60 110 320 0 0 0 0 0 6 25 31 3 Lockheed Martin Missiles and Fire Control - Orlando, FL 60 110 320 0 0 0 0 0 10 23 33 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (10) (11) (12) (13) FY 2023 (Lot 7) deliveries based on original contract period of performance (Pre-MYP procurement) FY 2024 (Lot 8) deliveries based on original contract period of performance (Pre-MYP procurement) FY 2025 (Lot 9) begins MYP FY 2026 (Lot 10) second order year of MYP LI 2291 - LRASM Navy UNCLASSIFIED Page 11 of 20 P-1 Line #17 Volume 1 - 215 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / LRASM C-3 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 55.681 Less PY Advance Procurement ($ in Millions) 332.657 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 670.456 - 0.000 - 598.008 670.456 - 670.456 - 332.657 FY 2027 Total 0.000 - 598.008 - 55.681 - - 332.657 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 598.008 - 55.681 FY 2027 Base - 670.456 - 670.456 - 0.000 670.456 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - LRASM C-3 Cost Recurring Cost 1.1.1) LRASM C-3 (†) (14) AUR 1.1.2) LRASM C-3 AUR (Tranche/ Supplemental Israel) (†) 5,329K 10 53.287 5,306K 30 159.192 4,935K 106 523.110 4,483K 129 578.307 - - 0.000 4,483K 129 578.307 - - 0.000 4,935K 17 83.895 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4,935K 8 39.480 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10 2.394 603,266.00 30 18.098 106 41.340 129 51.316 - - 0.000 129 51.316 - - 0.000 390,000.00 17 6.630 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 390,000.00 8 3.120 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.248 - - 1.540 - - 0.000 - - 1.540 - - 55.681 - - 310.415 - - 564.698 - - 631.163 - - 0.000 - - 631.163 (15) 1.1.3) LRASM C-3 AUR (Tranche/ Supplemental Taiwan) (†) (16) 1.1.4) Radios (†) (17) 1.1.5) Radios (Tranche/ Supplemental Israel) 239,400.00 (†) 390,000.00 397,800.00 397,800.00 (18) 1.1.6) Radios (Tranche/ Supplemental Taiwan) (†) (19) 1.1.7) Contractor ECO (20) Subtotal: Recurring Cost LI 2291 - LRASM Navy UNCLASSIFIED Page 12 of 20 P-1 Line #17 Volume 1 - 216 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / LRASM C-3 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware LRASM C-3 Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - 55.681 - - 310.415 - - 564.698 - - 631.163 - - 0.000 - - 631.163 - - 0.000 - - 0.000 - - 7.300 - - 7.445 - - 0.000 - - 7.445 - - 0.000 - - 10.459 - - 6.258 - - 8.815 - - 0.000 - - 8.815 Hardware - Nonrecurring and Ancillary Equip Cost Non Recurring Cost 2.1.1) NRE / Obsolescence (21) 2.1.2) Tooling/ Production Facilitization (22) 2.1.3) Telemetry Kits - - 0.000 - - 8.352 - - 8.023 - - 1.906 - - 0.000 - - 1.906 Subtotal: Non Recurring Cost - - 0.000 - - 18.811 - - 21.581 - - 18.166 - - 0.000 - - 18.166 Subtotal: Hardware Nonrecurring and Ancillary Equip Cost - - 0.000 - - 18.811 - - 21.581 - - 18.166 - - 0.000 - - 18.166 - - 0.000 - - 3.431 - - 9.154 - - 11.686 - - 0.000 - - 11.686 - - 0.000 - - 0.000 - - 2.575 - - 1.950 - - 0.000 - - 1.950 - - 0.000 - - 0.000 - - 0.000 - - 7.491 - - 0.000 - - 7.491 Subtotal: Support Cost - - 0.000 - - 3.431 - - 11.729 - - 21.127 - - 0.000 - - 21.127 Gross/Weapon System Cost - - 55.681 - - 332.657 - - 598.008 - - 670.456 - - 0.000 - - 670.456 Support Cost 3.1) Production Support (23) 3.2) Telemetry Kit Integration (24) 3.3) Operational Test Support (†) (25) indicates the presence of a P-5a Footnotes: (14) 1.1.1) LRASM C-3 (AGM-158C-3) AUR: Unit cost in FY 2027 and 2028 will reflect a savings as a result of the Economic Order Quantity (EOQ) funding related to the Large Lot Procurement (LLP), Multiyear Procurement (MYP), and long lead component investments in FY 2024, phased across the MYP to deliver weapons at higher production rates and generate efficiencies. The FY 2027 unit cost reflects the latest cost estimate for the procurement of an AGM-158 C-3 variant that provides the C++ software, BLOS Weapons Data Link, advanced survivability, and the JASSM-ER range and strike capability. The AGM-158 C-3 program has matured for better learning in terms of AUR costing elements with suppliers and supplies/materials. The most recent unit cost adjustment better reflects actual buying power of AUR quantity. The LRASM AUR cost element plus the Radio cost element comprise a full LRASM C-3 AUR end unit. The FY 2026 and FY 2027 mandatory (reconciliation) funds budget will be utilized for procurement of LRASM C-3 AUR. FY 2026 total reconciliation is $288.000 million of which $266.940 million estimated for 54 AUR units. FY 2027 total reconciliation is $236.389 million of which $217.295 million estimated for 48 AUR units. See Radios cost element 1.1.4 for additional reconciliation funding note. FY 2026 received a total of $419.000 million Congressional Add for LRASM AUR additional quantities; $387.000 million estimated for quantity 80 AUR only, remaining $32.000 million for 80 Radios. See Radios cost element 1.1.4 for additional Congressional Add funding note. LI 2291 - LRASM Navy UNCLASSIFIED Page 13 of 20 P-1 Line #17 Volume 1 - 217 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2291 / LRASM ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / LRASM C-3 MDAP/MAIS Code: (15) Supplemental Israel Tranche-8 funding received for procurement of AUR. Initial quantity estimated at 20 AUR, however based on current estimated unit pricing it is expected to procure 17 AUR. Awarding with FY 2026 Lot 10; unit costs align to FY 2026 budget value. (16) Supplemental Taiwan Tranche-5 funding received for procurement of AUR. Initial quantity estimated at 10 AUR, however based on current estimated unit pricing it is expected to procure 8 AUR. Awarding with FY 2026 Lot 10; unit costs align to FY 2026 budget value. (17) 1.1.2) LRASM C-3 radios will be provided to the Prime contractor as GFE for incorporation into the AUR and are denoted as a separate procurement. The radios are a 1:1 ratio with the AUR. Cost savings for economy of scale will not be realized until full rate production is achieved. Radio unit pricing increases based on latest estimates through technical maturity realizations. The FY 2026 and FY 2027 mandatory (reconciliation) funds budget will be utilized for procurement of LRASM AUR Radios; FY 2026 $21.060 million estimated for 54 units, FY 2027 $19.094 million estimated 48 units. See AUR cost element 1.1.1 for additional reconciliation funding note. FY 2026 received a total of $419.000 million Congressional Add for LRASM AUR; $32.000 million estimated for quantity 80 Radios only, remaining $387.000 million for 80 AUR. See AUR cost element 1.1.1 for additional Congressional Add funding note. (18) Supplemental Israel Tranche-8 for procurement of LRASM C-3 radios; radios are a 1:1 ratio with AUR. Initial quantity estimated at 20 LRASM C-3 radios, however based on current estimated unit pricing it is expected to procure 17 LRASM C-3 radios. Awarding with FY 2026 Lot 10; unit costs align to FY 2026 budget value. (19) Supplemental Taiwan Tranche-5 for procurement of LRASM C-3 radios; radios are a 1:1 ratio with AUR. Initial quantity estimated at 10 LRASM C-3 radios, however based on current estimated unit pricing it is expected to procure 8 LRASM C-3 radios. Awarding with FY 2026 Lot 10; unit costs align to FY 2026 budget value. (20) (21) 1.1.3) Contractor ECO increases due to procuring the AGM-158C-3 variant in FY 2027, with increased quantities to support over prior years. 2.1.1) NRE/Obsolescence: FY 2027 funding supports the LRASM Diminishing Manufacturing Sources and Material Shortages (DMSMS) Obsolescence contract. That contract will provide prime contractor engineering to address emerging, Navy specific production issues and manage obsolescence through studies, bridge buys, life of type buys, supplier/parts replacement which include electronic components used commercially and qualification activities to preserve future production capabilities and capacity. The increase in FY 2027 budget is to support an increased quantity for the AGM-158C-3 variant, which includes more costly unique components to include but not limited to the engine, radio, Weapons Data Link (WDL), Modular Adaptive Capability Payload (MADCAP), etc. In FY 2027 the cost element transitions solely to the LRASM C-3 portion of the overall budget to cover all common components for AGM-158C-1 and AGM-158C-3. (22) 2.1.2) Tooling/Production Facilitization represents the procurement of new fixtures, test stands, and other equipment necessary for the installation and test of the new systems, fuel tanks, radios, and subsystems required to support the production line conversion from AGM-158C-1 to AGM-158C-3 as well as any capacity throughput upgrades. The FY 2026 mandatory (reconciliation) budget included $62.000 million for a production facilitization effort to increase LRASM AUR production capacity. Funding was received in the program February 2026 and the effort was awarded in March 2026 for capacity increase from 240 AURs per year to 320 AURs per year beginning with the FY 2026 Lot 10 procurement. (23) 3.1) FY2027 reflects a budget transition in production support due to AGM-158C-3 developmental efforts reducing as well as continuing the shift from solely supporting AGM-158C-1 variant to supporting the increasing quantity of the AGM-158C-3 variant. (24) (25) 3.2) Telemetry Kit Integration: FY 2027 funding for incorporation of Telemetry Kits into AUR assets for utilization in test events. 3.3) Operational Test (OT) Support: FY 2027 is the initiation of the AGM-158C-3 variant specific OT, independent of prior year AGM-158C-1 AUR OT. Funding supports test squadrons, range targets, and support of kill chain analysis and tactics, techniques, and procedures (TTP) validation activities. Funds are specifically required to ensure that production items meet operational effectiveness and suitability thresholds, and to meet readiness and performance goals associated with the in production LRASM C-3 AUR. LI 2291 - LRASM Navy UNCLASSIFIED Page 14 of 20 P-1 Line #17 Volume 1 - 218 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (†) 1.1.1) LRASM C-3 AUR (†) 1.1.1) LRASM C-3 AUR (†) 1.1.1) LRASM C-3 AUR (†) 1.1.1) LRASM C-3 AUR 1.1.2) LRASM C-3 AUR (Tranche/ Supplemental Israel) (†) 1.1.3) LRASM C-3 AUR (Tranche/ Supplemental Taiwan) (†) Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty Contractor and Location 2024 Lockheed Martin Missiles and Fire Control / Troy, AL SS / FFP Eglin AFB Apr 2024 Jun 2026 10 5,329K Y Jul 2023 2025 Lockheed Martin Missiles and Fire Control / Troy, AL SS / FFP Eglin AFB Jul 2025 Jan 2028 30 5,306K Y Jul 2024 2026 Lockheed Martin Missiles and Fire Control / Troy, AL SS / FFP Eglin AFB Mar 2026 Mar 2029 106 4,935K Y Jul 2024 2027 Lockheed Martin Missiles and Fire Control / Troy, AL SS / FFP Eglin AFB Mar 2027 Mar 2030 129 4,483K Y Jul 2024 SS / FFP Eglin AFB Mar 2026 Mar 2029 17 4,935K Y Jul 2024 SS / FFP Eglin AFB Mar 2026 Mar 2029 8 4,935K Y Jul 2024 2025 2025 Lockheed Martin Missiles and Fire Control (26) / Troy, AL Lockheed Martin Missiles and Fire Control (27) / Troy, AL (Each) (†) 2024 Collins Aerospace / Cedar Rapids, IA SS / FFP San Diego, CA Jan 2024 Dec 2025 10 239,407.00 N Sep 2023 1.1.4) Radios (†) 2025 Collins Aerospace / Cedar Rapids, IA SS / FFP San Diego, CA Jun 2025 Dec 2027 30 603,266.00 N Sep 2023 1.1.4) Radios (†) 2026 Collins Aerospace / Cedar Rapids, IA SS / FFP San Diego, CA Jun 2026 Dec 2028 106 390,000.00 N Sep 2023 1.1.4) Radios (†) 2027 Collins Aerospace / Cedar Rapids, IA SS / FFP San Diego, CA Jun 2027 Dec 2029 129 397,800.00 N Sep 2023 SS / FFP San Diego, CA Jun 2026 Dec 2028 17 390,000.00 N Sep 2023 SS / FFP San Diego, CA Jun 2026 Dec 2028 8 390,000.00 N Sep 2023 Supplemental Israel) (†) 1.1.6) Radios (Tranche/ Supplemental Taiwan) (†) RFP Issue Date FY 1.1.4) Radios 1.1.5) Radios (Tranche/ (†) O O C Item Number / Title [DODIC]: 2 / LRASM C-3 (28) 2025 Collins Aerospace / Cedar Rapids, IA 2025 Collins Aerospace / Cedar Rapids, IA (29) indicates the presence of a P-21 Footnotes: (26) (27) (28) (29) Supplemental Israel Tranche-8 funding for LRASM C-3 AUR Supplemental TaiwanTranche-5 funding for LRASM C-3 AUR Supplemental Israel Tranche-8 funding for LRASM C-3 radios for incorporation into the Lot 10 LRASM C-3 AUR procurement Supplemental TaiwanTranche-5 funding for LRASM C-3 radios for incorporation into the Lot 10 LRASM C-3 AUR procurement LI 2291 - LRASM Navy UNCLASSIFIED Page 15 of 20 P-1 Line #17 Volume 1 - 219 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) LRASM C-3 AUR PROC QTY Item Number / Title [DODIC]: 2 / LRASM C-3 Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (14) 1 2024 NAVY 10 0 10 - - - 10 1 2025 NAVY 30 0 30 A - - - 30 1 2025 AF (‡) 29 0 29 A - - - 29 1 2025 Total 59 0 59 - - - 1 2026 NAVY 106 0 106 1 2026 AF (‡) 31 0 31 31 1 2026 Total 137 0 137 137 1 2027 NAVY (30) 0 129 129 1 2027 AF (‡) 111 0 111 111 1 2027 Total 240 0 240 240 129 1.1.2) LRASM C-3 AUR (Tranche/Supplemental Israel) 2 2025 NAVY 17 0 3 2025 NAVY - - - - - - - - - - - - - - 59 106 (15) 17 1.1.3) LRASM C-3 AUR (Tranche/Supplemental Taiwan) 1.1.4) Radios A - 8 0 8 17 (16) 8 (17) 4 2024 NAVY 10 0 10 4 2025 NAVY 30 0 30 4 2026 NAVY 106 0 106 106 4 2027 NAVY 129 0 129 129 17 17 1.1.5) Radios (Tranche/Supplemental Israel) 5 2025 NAVY 2025 NAVY 17 8 0 - - - - - - - - - - - - - - - - - - - A - - - - 10 30 (19) 0 8 8 O C T LI 2291 - LRASM Navy - (18) 1.1.6) Radios (Tranche/Supplemental Taiwan) 6 A - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 220 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) LRASM C-3 AUR PROC QTY Item Number / Title [DODIC]: 2 / LRASM C-3 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (14) 1 2024 NAVY 10 0 10 - - - - - - - - 1 2025 NAVY 30 0 30 - - - - - - - - - - - - - - - - - - - - - - - - 30 1 2025 AF (‡) 29 0 29 - - - - - - - - - - - - - - - - - - - - - - - - 29 1 2025 Total 59 0 59 - - - - - - - - - - - - - - - - - - - - - - - - 59 1 2026 NAVY 106 0 106 A - - - - - - - - - - - - - - - - - - - 106 1 2026 AF (‡) 31 0 31 A - - - - - - - - - - - - - - - - - - - 31 1 2026 Total 137 0 137 - - - - - - - - - - - - - - - - - - - 137 1 2027 NAVY (30) 0 129 A - - - - - - - 129 1 2027 AF (‡) 111 0 111 A - - - - - - - 111 1 2027 Total 240 0 240 - - - - - - - 240 129 1.1.2) LRASM C-3 AUR (Tranche/Supplemental Israel) 2 2025 NAVY 17 0 3 2025 NAVY 17 8 0 8 2024 NAVY 10 0 10 - - 2025 NAVY 30 0 30 - - 4 2026 NAVY 106 0 106 4 2027 NAVY 129 0 129 1.1.5) Radios (Tranche/Supplemental Israel) 2025 - - - - - - - - - - - - - - - - - - 17 A - - - - - - - - - - - - - - - - - - - 8 NAVY NAVY 17 8 0 2 - - - - - - - - - - - - - - - - - 30 A - - - - - - - - - - - - 2 - 2 - 2 - 0 - - - - - 106 A - - - - 129 17 A - - - - - - - - - - - - - - - 17 - 8 - (19) 0 8 A O C T LI 2291 - LRASM Navy 2 - (18) 1.1.6) Radios (Tranche/Supplemental Taiwan) 6 A - (17) 4 2025 0 (16) 4 5 8 (15) 1.1.3) LRASM C-3 AUR (Tranche/Supplemental Taiwan) 1.1.4) Radios 2 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 221 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) LRASM C-3 AUR PROC QTY Item Number / Title [DODIC]: 2 / LRASM C-3 Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N 2024 NAVY 10 10 0 1 2025 NAVY 30 0 30 - - - 3 2 3 2 3 2 3 2 3 2 3 2 1 2025 AF (‡) 29 0 29 - - - 2 2 2 3 2 3 2 3 2 3 2 3 1 2025 Total 59 0 59 - - - 5 4 5 5 5 5 5 5 5 5 5 5 1 2026 NAVY 106 0 106 - - - - - - - - - - - - - - 1 2026 AF (‡) 31 0 31 - - - - - - - - - - - - - 1 2026 Total 137 0 137 - - - - - - - - - - - - - 1 2027 NAVY (30) 0 129 - - - - - - - - - - - - 1 2027 AF (‡) 111 0 111 - - - - - - - - - - - 1 2027 Total 240 0 240 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 129 1.1.2) LRASM C-3 AUR (Tranche/Supplemental Israel) 2025 3 2025 J U L A U G S E P NAVY 17 0 NAVY 8 0 0 0 - - - - - - - 2 3 2 3 2 - - - - 10 11 11 12 11 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 - - - - - - - - - 2 2 2 2 2 2 2 3 - - - - - - - 1 1 1 1 1 1 1 1 8 8 9 9 9 9 0 9 45 3 2 14 12 11 59 - - 129 - - - 111 - - - 240 (16) 8 (17) NAVY 10 10 0 2025 NAVY 30 0 30 - - 4 2026 NAVY 106 0 106 - - - - - - - - - - - - - - 4 2027 NAVY 129 0 129 - - - - - - - - - - - - - - 17 - - - - - - - - - - - - - - 1.1.5) Radios (Tranche/Supplemental Israel) NAVY NAVY 17 8 0 0 3 2 3 2 3 2 3 2 3 2 3 0 4 5 - 7 - - 10 10 10 10 10 10 10 20 - - - - - - - 129 6 5 6 0 (19) 0 8 O C T LI 2291 - LRASM Navy 2 (18) 1.1.6) Radios (Tranche/Supplemental Taiwan) 2025 J U N - 2024 6 M A Y - 4 2025 A P R 0 4 5 M A R (15) 1.1.3) LRASM C-3 AUR (Tranche/Supplemental Taiwan) 1.1.4) Radios F E B (14) 1 2 B A L A N C E Fiscal Year 2029 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 20 S E P O C T N O V 2 D E C 2 J A N 2 F E B P-1 Line #17 2 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 222 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) LRASM C-3 AUR PROC QTY Item Number / Title [DODIC]: 2 / LRASM C-3 Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (14) 1 2024 NAVY 10 10 0 0 1 2025 NAVY 30 30 0 0 1 2025 AF (‡) 29 29 0 1 2025 Total 59 59 0 1 2026 NAVY 106 61 45 9 9 9 9 9 1 2026 AF (‡) 31 17 14 3 2 3 3 3 1 2026 Total 137 78 59 12 11 12 12 12 - - - - - - - - - - - - 1 2027 NAVY (30) 0 129 - - - - - 10 10 10 11 11 11 11 11 11 11 11 11 1 2027 AF (‡) 111 0 111 - - - - - 9 9 9 9 9 9 9 10 9 10 10 9 1 2027 Total 240 0 240 - - - - - 19 19 19 20 20 20 20 21 20 21 21 20 129 1.1.2) LRASM C-3 AUR (Tranche/Supplemental Israel) 2 2025 NAVY 17 14 3 2025 NAVY - - 3 8 7 1 2 - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - 0 0 0 - - - - - - - 0 0 1 0 NAVY 10 10 0 2025 NAVY 30 30 0 4 2026 NAVY 106 86 20 10 10 4 2027 NAVY 129 0 129 - - 1.1.5) Radios (Tranche/Supplemental Israel) NAVY 17 NAVY 8 0 0 17 10 10 11 11 11 11 11 11 11 11 11 0 0 0 (19) 8 0 0 O C T LI 2291 - LRASM Navy 0 10 (18) 1.1.6) Radios (Tranche/Supplemental Taiwan) 2025 - (17) 2024 6 - 1 4 2025 - (16) 4 5 - (15) 1.1.3) LRASM C-3 AUR (Tranche/Supplemental Taiwan) 1.1.4) Radios 0 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 223 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2291 / LRASM Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 2 / LRASM C-3 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 60 110 320 0 7 26 33 0 6 29 35 60 110 320 0 0 0 0 0 6 29 35 60 110 320 0 0 0 0 0 6 29 35 60 110 320 0 9 23 32 0 9 30 39 5 Collins Aerospace (28) - 60 110 320 0 0 0 0 0 9 30 39 6 Collins Aerospace (29) - 60 110 320 0 0 0 0 0 9 30 39 1 Lockheed Martin Missiles and Fire Control - Troy, AL 2 Lockheed Martin Missiles and Fire Control (26) - Troy, AL 3 Lockheed Martin Missiles and Fire Control (27) - Troy, AL 4 Collins Aerospace - Cedar Rapids, IA Cedar Rapids, IA Cedar Rapids, IA (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (26) (27) (28) (29) (30) Supplemental Israel Tranche-8 funding for LRASM C-3 AUR Supplemental TaiwanTranche-5 funding for LRASM C-3 AUR Supplemental Israel Tranche-8 funding for LRASM C-3 radios for incorporation into the Lot 10 LRASM C-3 AUR procurement Supplemental TaiwanTranche-5 funding for LRASM C-3 radios for incorporation into the Lot 10 LRASM C-3 AUR procurement The current Maximum Annual Production Rate for LRASM is 320 realizing a ramp of increasing capacity. LI 2291 - LRASM Navy UNCLASSIFIED Page 20 of 20 P-1 Line #17 Volume 1 - 224 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 125 10 16 32 - 32 20 17 18 18 Continuing Continuing 231.228 33.695 36.075 79.801 0.000 79.801 53.247 47.097 49.659 50.670 Continuing Continuing 3.837 3.837 3.829 - 3.829 3.826 - - 231.228 29.858 32.238 75.972 0.000 75.972 49.421 47.097 49.659 5.755 4.412 3.059 2.103 - 2.103 - - - 236.983 34.270 35.297 78.075 0.000 78.075 49.421 47.097 - To FY 2031 Complete - Total Continuing Continuing 50.670 Continuing Continuing - Continuing Continuing 49.659 50.670 Continuing Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - 2.915 2.936 2.980 - 2.980 3.051 3.106 3.160 3.223 Continuing 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 1,850K 3,370K 2,255K 2,494K - 2,494K 2,662K 2,770K 2,759K 2,815K Continuing Continuing Description: The Naval Strike Missile (NSM) provides the Littoral Combat Ship (LCS), and Guided-Missile Destroyers (DDGs) ships with long range offensive strike capability against surface combatants. The OTH Weapon Systems (WS) consists of a Missile Launch System (MLS) and a complement of missiles. Missile Launch System components include: a Launch Mechanism, Operator Interface, and Fire Control System which are procured with Other Procurement, Navy (OPN) Funds. Missile components include a missile encased in a firing canister (encanistered missile). An encanistered missile consists of a flight vehicle that is mechanically and electrically connected within a weapon canister. The flight vehicle's major components are operationally joined, consisting of a warhead (explosive), propulsion system, guidance system, initiation system, and other components. The weapon canister is a mechanical structure with electrical interconnections that is used to support and restrain the flight vehicle during loading and unloading operations. The weapon canister allows the flight vehicle to mechanically and electrically connect to the Missile Launch System without being exposed to the environment. The funding profile reflects a five-year Multiyear Procurement that begins in FY 2024 and completes in FY 2028. Advance Procurement information for this program is provided in the P-10 exhibit. Production Engineering Support - Original Equipment Manufacturer (OEM) funding supports: development of processes to ensure equipment quality and procedures to effectively operate and maintain its reliability; acquisition and cataloging of spare parts to maintain required system availability; managing the configuration baseline (hardware and software) and addressing parts obsolesce issues; acquisition and maintenance of production test equipment; participation in Configuration Control Boards (CCB); implementation of Engineering Change Proposals (ECPs) as needed; collection and analysis of production test metrics; implementation of a Quality Program Plan (QPP); maintenance of a Failure Analysis and Corrective Action Report Database (FRACAS). This is a time-based support element that represents production engineering support over the procurement buy and not tied to quantity. Engineering Support Government and Contractor funding supports: Computer Resources used to identify, plan, resource, and acquire facilities, hardware, software, documentation, manpower and personnel necessary for planning and management of mission critical systems. Government Product Support Management in compliance with the critical acquisition of Product Support Manager (PSM) in accordance with Section 805 of Public Law 111-84. Assist with Demilitarization (DEMIL)/disposal plans, Command Pass Coordinator (CPC), review of ECPs, Milestone Decision Authority (MDA) requirements, risk assessment, Curriculum Design, performance improvement, cost, manage Material Potentially Presenting an Explosive Hazards (MPPEH). Contract Program Management Office (PMO) Subject Management Experts(s) (SME(s)) provide direct support to the PMO by assisting the program manager with day-to-day acquisition and technical requirements. Develop Technical Manuals (revision of contractor provided manuals) and LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 1 of 14 P-1 Line #18 Volume 1 - 225 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A alignment with USN standards. Support OTH WS Integrated Product Teams, Program Management Reviews and Critical Reviews. System Engineering & Safety Block 1A review and approval. Participate in Production Readiness Reviews. Conduct assessment of production test data. Line item previously referred to as Littoral Combat Ship (LCS) Over the Horizon (OTH) Missile. Other Related Budgets: PMC LI 2292 and 2292C Advance Procurement OPN LI 5231 RDTEN PE 0604756N PROJ 2070 OMN PE 0204228N LI 1D4D/14D90 LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 2 of 14 P-1 Line #18 Volume 1 - 226 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Naval Strike Missile (NSM) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 125 / 231.228 10 / 33.695 16 / 36.075 32 / 79.801 - / 0.000 32 / 79.801 125 / 231.228 10 / 33.695 16 / 36.075 32 / 79.801 - / 0.000 32 / 79.801 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 will procure 32 NSM to support DoNs core mission priorities: strengthening maritime dominance, building warfighting excellence, and enhancing strategic partnerships are fundamentally driven by the urgent need for readiness, lethality, and modernization. Naval Strike Missile (NSM) funding is required to support Over The Horizon Weapon System program for Littoral Combat Ship (LCS), and Guided-Missile Destroyers (DDGs) Ships. The program provides a longrange anti-surface offensive capability to improve the ship's ability to defend against enemy surface ships. The funding profile reflects a five-year Multiyear Procurement that began in FY 2024 and completes in FY 2028. Advance Procurement information for this program is provided in the P-10 exhibit. FY 2027 is the fourth year of a five-year Multi-Year Procurement (MYP) contract. NSM Minimum Sustaining Rate (MSR) is 32 based on the USN capacity within the factory. FY 2026 quantities of 13 are properly displayed on the P-5. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 3 of 14 P-1 Line #18 Volume 1 - 227 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 Total Obligation Authority ($ in Millions) FY 2027 OOC 16 32 231.228 33.695 36.075 79.801 231.228 Plus CY Advance Procurement ($ in Millions) FY 2027 Base 10 - Net Procurement (P-1) ($ in Millions) FY 2026 125 FY 2027 Total - 32 0.000 79.801 3.837 3.837 3.829 - 3.829 29.858 32.238 75.972 0.000 75.972 5.755 4.412 3.059 2.103 - 2.103 236.983 34.270 35.297 78.075 0.000 78.075 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) - 2.915 2.936 2.980 - 2.980 1,850K 3,370K 2,255K 2,494K - 2,494K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Naval Strike 1,689K 121 (†) (2) - - Subtotal: Recurring Cost - - - - - - Missile (†) (1) 1.1.2) Naval Strike Missile (Options) Subtotal: Hardware Cost 204.348 2,204K 10 22.036 2,204K 11 24.240 2,204K 12 26.443 - - - 2,204K 12 26.443 - - - 2,250K 2 4.500 2,250K 20 45.000 - - - 2,250K 20 45.000 204.348 - - 22.036 - - 28.740 - - 71.443 - - - - - 71.443 204.348 - - 22.036 - - 28.740 - - 71.443 - - - - - 71.443 - 9.197 - - 4.988 - - 3.191 - - 3.621 - - - - - 3.621 - 17.683 - - 6.671 - - 4.144 - - 4.737 - - - - - 4.737 - Support Cost 2.1) Production Engineering Support OEM (3) 2.2) Production Engineering Support (GOV & CTR) (4) Subtotal: Support Cost - - 26.880 - - 11.659 - - 7.335 - - 8.358 - - - - - 8.358 Gross/Weapon System Cost 1,850K 125 231.228 3,370K 10 33.695 2,255K 16 36.075 2,494K 32 79.801 - - 0.000 2,494K 32 79.801 (†) indicates the presence of a P-5a Footnotes: LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 4 of 14 P-1 Line #18 Volume 1 - 228 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) MDAP/MAIS Code: (1) FY 2027: Based on current multi-year procurement (MYP) negotiated pricing, the program anticipates procuring 32 missiles, 12 AURs with unit cost $2,204K and 20 AURs with unit cost $2,250K (expected price for additional quantities - see cost element 1.1.2) FY 2026: AUR quantities have been reduced from 16 to 13 to account for accurate MYP unit cost. Based on current MYP negotiated pricing, 11 AURs with unit cost $2,204K and 2 AURS with unit cost $2,250 (see cost element 1.1.2). The Navy and Marine Corps collaborate on NSM procurements to optimize cost savings. (2) FY 2027: Based on current multi-year procurement (MYP) negotiated pricing, the program anticipates procuring 32 missiles, 12 AURs with unit cost $2,204K (see cost element 1.1.1) and 20 AURs with unit cost $2,250K (expected price for additional quantities) FY 2026: AUR quantities have been reduced from 16 to 13 to account for accurate MYP unit cost. Based on current MYP negotiated pricing, 11 AURs with unit cost $2,204K (see cost element 1.1.1) and 2 AURS with unit cost $2,250. The Navy and Marine Corps collaborate on NSM procurements to optimize cost savings. (3) Engineering Support to prime Contractor (KDA) provides for both the DON and USMC. Original Equipment Manufacturer (OEM) funding supports: development of processes to ensure equipment quality and procedures to effectively operate and maintain its reliability; acquisition and cataloging of spare parts to maintain required system availability; managing the configuration baseline (hardware and software) and addressing parts obsolesce issues; acquisition and maintenance of production test equipment; participation in Configuration Control Boards (CCB); implementation of Engineering Change Proposals (ECPs) as needed; collection and analysis of production test metrics; implementation of a Quality Program Plan (QPP); maintenance of a Failure Analysis and Corrective Action Report Database (FRACAS). This is a timebased support element that represents production engineering support over the procurement buy and not tied to quantity. (4) Production Engineering Support CONOS GOV & CTR provided for both the DON and USMC. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 5 of 14 P-1 Line #18 Volume 1 - 229 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 O O C Cost Elements P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1.1.1) Naval Strike Missile (†) 2019 Raytheon CO / Tucson AZ C / FFP NAVSEA Dec 2018 Jun 2021 8 2,462K Y Feb 2017 1.1.1) Naval Strike Missile (†) 2020 Raytheon CO / Tucson AZ C / FFP NAVSEA Feb 2020 Aug 2022 18 1,909K Y Feb 2017 1.1.1) Naval Strike Missile (†) 2021 Raytheon CO / Tucson AZ C / FFP NAVSEA Mar 2021 Sep 2023 15 1,854K Y Feb 2017 1.1.1) Naval Strike Missile (†) 2022 Raytheon CO / Tucson AZ C / FFP NAVSEA Jun 2022 Dec 2024 32 1,524K Y Feb 2017 1.1.1) Naval Strike Missile (†) Raytheon CO / Tucson AZ C / FFP NAVSEA Mar 2023 Feb 2027 36 1,496K Y Feb 2017 1.1.1) Naval Strike Missile (†) C / FFP NAVSEA Nov 2024 May 2027 9 2,204K Y May 2023 1.1.1) Naval Strike Missile (†) C / FFP NAVSEA Aug 2025 Feb 2028 10 2,204K Y May 2023 1.1.1) Naval Strike Missile (†) C / FFP NAVSEA May 2026 Nov 2028 11 2,204K Y May 2023 1.1.1) Naval Strike Missile (†) C / FFP NAVSEA Feb 2027 Aug 2029 12 2,204K Y May 2023 1.1.2) Naval Strike Missile 2023 (5) 2024 2025 2026 2027 Kongsberg Defence and Aerospoace (6) / Kongsberg, Norway Kongsberg Defence and Aerospoace (6) / Kongsberg, Norway Kongsberg Defence and Aerospoace (6) / Kongsberg, Norway Kongsberg Defence and Aerospoace (6) / Kongsberg, Norway 2026 Kongsberg Defence and Aerospace / Kongsberg, Norway C / FFP NAVSEA May 2026 Nov 2028 2 2,250K Y May 2023 2027 Kongsberg Defence and Aerospace / Kongsberg, Norway C / FFP NAVSEA Feb 2027 Aug 2029 20 2,250K Y May 2023 Jet Engine 2025 SAFRAN / Toulouse, France C / FFP NAVSEA Dec 2024 Jun 2026 10 78,500.00 Y May 2023 Jet Engine 2026 SAFRAN / Toulouse, France C / FFP NAVSEA Dec 2025 Jun 2027 11 49,636.36 Y May 2023 Jet Engine 2027 SAFRAN / Toulouse, France C / TBD NAVSEA Oct 2026 Apr 2028 12 31,583.33 N Warhead 2025 TDW / Schrobenhausen, Germany C / FFP NAVSEA Dec 2024 Jun 2026 10 68,800.00 Y May 2023 Warhead 2026 TDW / Schrobenhausen, Germany C / FFP NAVSEA Dec 2025 Jun 2027 11 42,636.36 Y May 2023 Warhead 2027 TDW / Schrobenhausen, Germany C / TBD NAVSEA Oct 2026 Apr 2028 12 26,916.67 N Booster 2025 NAMMO / Raufoss, Norway C / CS NAVSEA Dec 2024 Aug 2026 10 88,000.00 Y May 2023 Booster 2026 NAMMO / Raufoss, Norway C / CS NAVSEA Dec 2025 Aug 2027 11 56,272.73 Y May 2023 Booster 2027 NAMMO / Raufoss, Norway C / TBD NAVSEA Oct 2026 Jun 2028 12 34,250.00 N 2025 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Dec 2024 Jun 2026 10 49,200.00 Y May 2023 2026 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Dec 2025 Jun 2027 11 31,000.00 Y May 2023 2027 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / TBD NAVSEA Oct 2026 Apr 2028 12 21,333.33 N (Options) (†) 1.1.2) Naval Strike Missile (Options) (†) Advance Procurement Seeker Assembly Seeker Assembly Seeker Assembly LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 6 of 14 P-1 Line #18 Volume 1 - 230 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2025 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Dec 2024 Jun 2026 10 29,600.00 Y May 2023 2026 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Dec 2025 Jun 2027 11 18,181.82 Y May 2023 2027 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / TBD NAVSEA Oct 2026 Apr 2028 12 11,333.33 N Launcher/Ramp 2025 Raytheon / Louisville, Kentucky C / FFP NAVSEA Dec 2024 Jun 2026 10 49,000.00 Y May 2023 Launcher/Ramp 2026 Raytheon / Louisville, Kentucky C / FFP NAVSEA Dec 2025 Jun 2027 11 31,000.00 Y May 2023 Launcher/Ramp 2027 Raytheon / Louisville, Kentucky C / TBD NAVSEA Oct 2026 Apr 2028 12 18,583.33 N 2025 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Dec 2024 Dec 2026 10 78,100.00 Y May 2023 2026 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / FFP NAVSEA Oct 2025 Oct 2027 11 49,363.64 Y May 2023 2027 Kongsberg Defence and Aerospoace / Kongsberg, Norway C / TBD NAVSEA Oct 2026 Oct 2028 12 31,250.00 N Semiconductor/ CCA Assemblies Semiconductor/ CCA Assemblies Semiconductor/ CCA Assemblies Airframe Airframe Airframe (†) O O C P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) (Each) indicates the presence of a P-21 Footnotes: (5) (6) Supply chain issues have impacted lead times for missiles. To mitigate the impact the OEM is incentivized to deliver FY 23 EM deliveries between 1/31/26 and 8/31/26. Program anticipates a similar 30-month lead time from Award to first Delivery. Due to AP funding provided subsequent years will see a reduction in delivery times from contract award. Contract will be sole source to Kongsberg Defence and Aerospace (KDA), the Original Equipment Manufacturer, Raytheon Missiles and Defense (RMD) will be a major subcontractor to KDA. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 7 of 14 P-1 Line #18 Volume 1 - 231 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3 1 2019 NAVY 8 0 8 1 2020 NAVY 18 0 18 1 2021 NAVY 15 0 15 15 1 2022 NAVY 32 0 32 32 1 2023 NAVY (7) 0 36 36 2 2024 NAVY 9 0 9 9 2 2025 NAVY 10 0 10 10 2 2026 NAVY 11 0 11 11 2 2027 NAVY 12 0 12 12 36 1.1.2) Naval Strike Missile (Options) A - - - - - - - - - - - - - - - - - - - - - - 8 A - - - - - - - - 18 (2) 3 2026 NAVY 2 0 2 2 3 2027 NAVY 20 0 20 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 232 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3 1 2019 NAVY 8 0 8 - - - - - - - - 1 2020 NAVY 18 0 18 - - - - - - - - - - - - - - - - - - - - - - 18 1 2021 NAVY 15 0 15 A - - - - - - - - - - - - - - - - - - - 15 1 2022 NAVY 32 0 32 A - - - - 32 1 2023 NAVY (7) 0 36 2 2024 NAVY 9 0 9 9 2 2025 NAVY 10 0 10 10 2 2026 NAVY 11 0 11 11 2 2027 NAVY 12 0 12 12 36 1.1.2) Naval Strike Missile (Options) 7 1 0 0 36 (2) 3 2026 NAVY 2 0 2 2 3 2027 NAVY 20 0 20 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 233 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3 1 2019 NAVY 8 8 0 1 2020 NAVY 18 18 0 1 2021 NAVY 15 0 15 - - - - - - - - - - - 15 1 2022 NAVY 32 0 32 - - - - - - - - - - - - - - - - - - - - - - - - 32 1 2023 NAVY (7) 0 36 A - - - - - - - - - - - - - - - - - - - 36 2 2024 NAVY 9 0 9 9 2 2025 NAVY 10 0 10 10 2 2026 NAVY 11 0 11 11 2 2027 NAVY 12 0 12 12 36 1.1.2) Naval Strike Missile (Options) 0 0 0 (2) 3 2026 NAVY 2 0 2 2 3 2027 NAVY 20 0 20 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 234 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3 1 2019 NAVY 8 8 0 0 1 2020 NAVY 18 18 0 0 1 2021 NAVY 15 15 0 1 2022 NAVY 32 0 32 - - 16 - - 16 1 2023 NAVY (7) 0 36 - - - - - - - - - - 2 2024 NAVY 9 0 9 A - - - - - - - - - 2 2025 NAVY 10 0 10 2 2026 NAVY 11 0 11 2 2027 NAVY 12 0 12 36 1.1.2) Naval Strike Missile (Options) 0 0 - - - - - - - - - - - - - - 36 - - - - - - - - - - - - - - 9 A - - - - - - - - - - - - - - 10 A - - - - - 11 12 (2) 3 2026 NAVY 2 0 2 3 2027 NAVY 20 0 20 A - - - - 2 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 235 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 3 1 2019 NAVY 8 8 0 0 1 2020 NAVY 18 18 0 0 1 2021 NAVY 15 15 0 0 1 2022 NAVY 32 32 0 1 2023 NAVY (7) 0 36 - - - - 36 2 2024 NAVY 9 0 9 - - - - - - - 2 2025 NAVY 10 0 10 - - - - - - - - - - - - - - - - 2 2026 NAVY 11 0 11 - - - - - - - - - - - - - - - - 2 2027 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - 36 1.1.2) Naval Strike Missile (Options) 0 0 9 0 4 - - 6 - - - - - - - - 11 0 - - - - - - - - - 12 - - - - - - - - - - 2 - - - - - - - - - - 20 (2) 3 2026 NAVY 2 0 2 3 2027 NAVY 20 0 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 236 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT PROC QTY SERVICE 1.1.1) Naval Strike Missile Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 3 1 2019 NAVY 8 8 0 0 1 2020 NAVY 18 18 0 0 1 2021 NAVY 15 15 0 0 1 2022 NAVY 32 32 0 0 1 2023 NAVY (7) 36 0 0 2 2024 NAVY 9 9 0 0 2 2025 NAVY 10 10 0 2 2026 NAVY 11 0 11 - 2 2027 NAVY 12 0 12 - 36 1.1.2) Naval Strike Missile (Options) 0 6 - - - - - - - - - 5 0 - - - - - - 6 - - 6 - - - - - 6 - - 12 0 (2) 3 2026 NAVY 2 0 2 - 3 2027 NAVY 20 0 20 O C T LI 2292 - Naval Strike Missile (NSM) Navy 1 N O V D E C J A N 1 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V D E C J A N 2 F E B P-1 Line #18 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 237 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Item Number / Title [DODIC]: 1 / Naval Strike Missile (NSM) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1-8-5 For 2027 MAX For 2027 32 125 125 0 0 30 30 0 0 30 30 32 350 350 0 0 30 30 0 0 30 30 32 35 350 0 0 30 30 0 0 30 30 2 Kongsberg Defence and (6) ALT After Oct 1 MSR For 2027 1 Raytheon CO - Tucson AZ Aerospoace Norway ALT Prior to Oct 1 - Kongsberg, 3 Kongsberg Defence and Aerospace - Kongsberg, Norway "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (6) Program anticipates a similar 30-month lead time from Award to first Delivery. Due to AP funding provided subsequent years will see a reduction in delivery times from contract award. Contract will be sole source to Kongsberg Defence and Aerospace (KDA), the Original Equipment Manufacturer, Raytheon Missiles and Defense (RMD) will be a major subcontractor to KDA. (7) Supply chain issues have impacted lead times for missiles. To mitigate the impact the OEM is incentivized to deliver FY 23 EM deliveries between 1/31/26 and 8/31/26. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 14 of 14 P-1 Line #18 Volume 1 - 238 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 5.755 4.412 3.059 2.103 - 2.103 - - - - Continuing Continuing Net Procurement (P-1) ($ in Millions) 5.755 4.412 3.059 2.103 - 2.103 - - - - Continuing Continuing Total Obligation Authority ($ in Millions) 5.755 4.412 3.059 2.103 - 2.103 - - - - Continuing Continuing Description: The Naval Strike Missile (NSM) provides the Littoral Combat Ship (LCS), and Guided-Missile Destroyers (DDGs) ships with long range offensive strike capability against surface combatants. The OTH Weapon Systems (WS) consists of a Missile Launch System (MLS) and a complement of missiles. Missile components include a missile encased in a firing canister (encanistered missile). An encanistered missile consists of a flight vehicle that is mechanically and electrically connected within a weapon canister. The flight vehicle's major components are operationally joined, consisting of a warhead (explosive), propulsion system, guidance system, initiation system, and other components. The weapon canister is a mechanical structure with electrical interconnections that is used to support and restrain the flight vehicle during loading and unloading operations. The weapon canister allows the flight vehicle to mechanically and electrically connect to the Missile Launch System without being exposed to the environment. FY 2028 is the last year of a five year MYP, therefore no AP funds are required in FY 2028. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #19 Volume 1 - 239 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / Naval Strike Missile (NSM) 125 / 5.755 10 / 4.412 16 / 3.059 32 / 2.103 - / - 32 / 2.103 P-40 Total Gross/Weapon System Cost 125 / 5.755 10 / 4.412 16 / 3.059 32 / 2.103 - / - 32 / 2.103 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The use of Advance Procurement funding for boosters (raw and energetic material), warheads (raw and energetic material), airframe (composite materials and titanium), seeker components (detectors, microcircuits and CCA components), semiconductors/CCA assemblies (CCA components), launcher/ramp (composites) and jet engine (titanium) reduces lead time and results in substantial cost savings. Full funding for every end item requesting advance procurement is included in the budget submission. Implementation of this proposed MYP will yield substantial savings through the term of the contract. Specifically, savings for FY 2024 through FY 2028 attributable to this MYP strategy is estimated at $24.1M for a total of 13.6 percent contract savings. Major Adjustments: FY 2026 to FY 2027 AP/EOQ funding decreased from $3.059 to $2.103 million due to MYP AP/EOQ phasing. DoNs core mission priorities: strengthening maritime dominance, building warfighting excellence, and enhancing strategic partnerships are fundamentally driven by the urgent need for readiness, lethality, and modernization. This is a driving factor to increase missile procurement. 1.1.1) The funding profile reflects a five-year Multiyear Procurement that begins in FY 2024 and completes in FY 2028. Advance Procurement information for this program is provided in the P-10 exhibit. FY 2027 is the fourth year of a five-year Multi-Year Procurement (MYP) contract. NSM Minimum Sustaining Rate (MSR) is 28 based on the USN capacity within the factory. 2.1) Production Engineering Support provides for both DON and USMC. 2.2) Engineering Support Government and Contractor provides for both the DON and USMC. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #19 Volume 1 - 240 === page 281 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 First System (2027) Award Date: January 2013 First System (2027) Completion Date: January 2013 Naval Strike Missile (NSM) Production Leadtime P-5 Number / Title: 1 / Naval Strike Missile (NSM) Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) Quantity When Required Prior Years (Months) FY 2026 (Each) 125 Cost Elements Date: April 2026 10 FY 2025 ($ M) FY 2027 (Each) (Each) 16 FY 2026 ($ M) 32 FY 2027 ($ M) ($ M) CFE (†) 18 1.024 0.785 0.546 0.379 18 0.898 0.688 0.469 0.323 20 1.150 0.880 0.619 0.411 18 0.639 0.492 0.341 0.256 18 0.386 0.296 0.200 0.136 18 0.639 0.490 0.341 0.223 24 1.019 0.781 0.543 0.375 Total: CFE 5.755 4.412 3.059 2.103 Total Advance Procurement/Obligation Authority 5.755 4.412 3.059 2.103 Jet Engine Warhead Booster (†) (†) Seeker Assembly (†) Semiconductor/ CCA Assemblies Launcher/Ramp Airframe (†) (†) (†) LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #19 Volume 1 - 241 === page 282 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 P-1 Line Item Number / Title: 2292 / Naval Strike Missile (NSM) Date: April 2026 P-5 Number / Title: 1 / Naval Strike Missile (NSM) FY 2027 Cost Elements Production Leadtime QPA Unit Cost (Months) (Each) ($) Contract Forecast Date 2027 Qty Total Cost Request For FY (Each) ($ M) CFE Jet Engine Warhead Booster (†) (†) (†) Seeker Assembly (†) Semiconductor/ CCA Assemblies Launcher/Ramp Airframe (†) (†) (†) 1 18 31,583.33 Oct 2026 12 0.379 1 18 26,916.67 Oct 2026 12 0.323 1 20 34,250.00 Oct 2026 12 0.411 1 18 21,333.33 Oct 2026 12 0.256 1 18 11,333.33 Oct 2026 12 0.136 1 18 18,583.33 Oct 2026 12 0.223 1 24 31,250.00 Oct 2026 12 0.375 Total: CFE 2.103 Total Advance Procurement/Obligation Authority 2.103 Description: This multiyear contract uses Economic Order Quantity Advance Procurement funding to provide the U.S. Government maximum savings in price. Advance Procurement funding will enable material and component suppliers and subcontractors with sufficient lead time to support the planned delivery schedule within the context of the multiyear funding, prices, and cancellation ceilings. Implementation of this proposed multiyear procurement (MYP) will yield substantial savings through the term of the contract. Specifically, savings for FY 2024 through FY 2028 attributable to this MYP strategy is estimated at $24.1M for a total of 13.6 percent contract savings. Unit costs for WPN and PMC AP/EOQ differ due to fluctuations in the WPN quantities. Finalized unit costs for each cost element will be adjusted for both appropriations upon MYP contract award. *QTY shown is for the NSM Blk IA MYP Cost of parts are subject to change upon receipt of final Kongsberg Defence and Aerospace (KDA) proposal and negotiations. Therefore, unit cost is subject to change. Total MYP Procurement Quantity 515 All Up Rounds. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI 2292 - Naval Strike Missile (NSM) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #19 Volume 1 - 242 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2294 / Multi-mission Affordable Capacity Effector (MACE) Program Elements for Code B Items: N/A Other Related Program Elements: 0604659N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - 691 976 1,115 1,375 - 4,157 0.000 0.000 0.000 0.000 0.000 0.000 299.966 399.937 399.843 500.455 - 1,600.201 - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 299.966 299.966 399.937 399.937 399.843 399.843 To FY 2031 Complete 500.455 500.455 Total - 1,600.201 - 1,600.201 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - 0.000 0.000 0.000 0.000 - 0.000 Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 434.104 409.772 358.604 363.967 - 384.941 Description: Multi-mission Affordable Capacity Effector (MACE) will provide launch platforms extended standoff capability, maximize weapon load-out, and control unit costs to rapidly scale production quantities and achieve necessary inventory levels. To control costs, maximize affordability, and extend capability relevance, MACE will leverage government directed interface standards and best commercial practices to enable the insertion of upgraded components or design changes to address obsolescence, producibility requirements, and enable rapid affordable future upgrades to pace the threat and meet key operational problems. In response to MACE requirements, the NAVAIR Rapid Capability Cell (NRCC) is utilizing Rapid Capability Office (RCO) authorities to accelerate the integration, test, and certification of the Hypersonic Weapon solution via Small Business Innovative Research (SBIR) competition for a low-cost air-launched hypersonic missile onto F/A-18E/F carrier-based aircraft. NRCC will broaden the competitive munitions industrial base to increase munitions production capacity, deliver relevant capability to the fleet ahead of adversary reaction times, demonstrate integration flexibility with rapidly iterating missile design through an Early Operational Capability (EOC) and provide the program structure necessary to enable transition into a Program of Record (POR) in accordance with acquisition transformation strategy. POR will continue testing thru Initial Operational Capability, a Full Rate Production Decision, and continued P3I enhancements to enable rapid affordable future upgrades to pace the threat and meet key operational problems. FY2027 MACE program includes includes $0 of discretionary funding and $156,000 thousand of mandatory (reconciliation) funds for a total of $156,000 thousand FY2027 funding. FY2027 mandatory (reconciliation) funding supports the procurement of 353 LOT 1 MACE AURs and associated production engineering, logistics and program management support. FY2026 MACE program includes $0 of discretionary funding and $44,000 thousand of mandatory (reconciliation) funds for a total of $44,000 thousand FY2026 funding. FY2026 mandatory (reconciliation) funding supports the Lot 1 AUR procurement. LI 2294 - Multi-mission Affordable Capacity Effect... Navy UNCLASSIFIED Page 1 of 1 P-1 Line #20 Volume 1 - 243 === page 284 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 244 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2295 / Precision Attack Strike Munition (PASM) Program Elements for Code B Items: N/A Other Related Program Elements: 0605450M Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2025 FY 2026 - - - Gross/Weapon System Cost ($ in Millions) 0.000 0.000 0.000 4.019 Less PY Advance Procurement ($ in Millions) - - - - 0.000 0.000 0.000 4.019 Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 4 FY 2027 Total To FY 2031 Complete FY 2028 FY 2029 FY 2030 4 44 175 185 182 Continuing 0.000 4.019 29.824 102.887 103.855 103.380 Continuing - - - 0.000 4.019 29.824 - - - - - - - - 0.000 0.000 0.000 4.019 0.000 4.019 29.824 102.887 102.887 103.855 103.855 103.380 Continuing - Continuing 103.380 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - 0.00 - 0.00 0.00 0.00 0.00 0.00 - Gross/Weapon System Unit Cost ($ in Dollars) - - - 1,005K - 1,005K 677,818.18 587,925.71 561,378.38 568,021.98 Continuing Continuing Description: The Precision Attack Strike Munition is an air-launched missile that provides a longer-range, precision strike weapon capable of deterring and engaging maritime and land-based targets. PASM builds off of the subsystem maturation, integration, and demonstration efforts of the Long-Range Attack Munition (LRAM) Joint Capability Technology Demonstration (JCTD). PASM will provide asymmetric advantages in range, stand-off and lethality. PASM is designed with a Weapons Open System Architecture (WOSA) to form fit multiple types of payloads based on mission while using common mounting systems and launchers to simplify logistics requirements. PASM is initially designed to utilize mature, non-integrated capabilities for the fire control system. The AH-1Z is the threshold platform for the USMC. The PASM system includes missiles, trainers, containers, federated platform integration solution, support equipment, modular payloads, and software modifications. LI 2295 - Precision Attack Strike Munition (PASM) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #21 Volume 1 - 245 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2295 / Precision Attack Strike Munition (PASM) Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 2: Tactical Missiles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605450M Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Precision Attack Strike Munition (PASM) P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / 0.000 4 / 4.019 - / 0.000 4 / 4.019 - / 0.000 - / 0.000 - / 0.000 4 / 4.019 - / 0.000 4 / 4.019 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports the transition from the Rapid Prototyping Middle Tier Acquisition program to follow-on production of the PASM system. FY 2027 funding is required in support of the standup of PASM production capability and initial LRIP missiles. LI 2295 - Precision Attack Strike Munition (PASM) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #21 Volume 1 - 246 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2295 / Precision Attack Strike Munition (PASM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Precision Attack Strike Munition (PASM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base - - - 0.000 0.000 0.000 FY 2027 OOC 4 FY 2027 Total - 4.019 4 0.000 4.019 - - - - - - 0.000 0.000 0.000 4.019 0.000 4.019 - - - - - - 0.000 0.000 0.000 4.019 0.000 4.019 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - 1,005K - 1,005K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) PASM All-Up- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.1) Integrated Logistics Support - - - - - - - - - 2.2) Production Engineering Support - - - - - - - - 2.3) Other Production Support (†) Round (AUR) Subtotal: Recurring Cost Subtotal: Hardware Cost 648,969.00 4 2.596 - - - 648,969.00 4 2.596 - 2.596 - - - - - 2.596 - 2.596 - - - - - 2.596 - - 0.450 - - - - - 0.450 - - - 0.450 - - - - - 0.450 Support Cost - - - - - - - - - - - 0.523 - - - - - 0.523 Subtotal: Support Cost - - - - - - - - - - - 1.423 - - - - - 1.423 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 1,005K 4.019 - - 0.000 1,005K (†) 4 4 4.019 indicates the presence of a P-5a LI 2295 - Precision Attack Strike Munition (PASM) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #21 Volume 1 - 247 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 2 Cost Elements 1.1.1) PASM All-Up-Round (AUR) O O C P-1 Line Item Number / Title: 2295 / Precision Attack Strike Munition (PASM) FY Contractor and Location Method/Type or Funding Vehicle 2027 L3 Harris / Ashburn, VA TBD LI 2295 - Precision Attack Strike Munition (PASM) Navy Location of PCO NAVAIR, Patuxent River, MD UNCLASSIFIED Page 4 of 4 Item Number / Title [DODIC]: 1 / Precision Attack Strike Munition (PASM) Award Date Date of First Delivery Jun 2027 Jun 2029 P-1 Line #21 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 4 648,969.00 N Jan 2027 RFP Issue Date Oct 2026 Volume 1 - 248 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2301 / Tomahawk Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,245.745 1,245.745 1,245.745 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 285.157 285.157 285.157 6.283 6.283 6.283 799.139 - 0.000 - 799.139 - 0.000 - 799.139 0.000 799.139 799.139 799.139 1,400.564 1,400.564 1,400.564 1,428.153 1,428.153 1,428.153 1,465.503 1,465.503 1,465.503 To FY 2031 Complete 1,485.223 1,485.223 1,485.223 Total 3,205.481 11,321.248 3,205.481 11,321.248 3,205.481 11,321.248 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Block V Tactical Tomahawk (TACTOM RGM/UGM-109E) preserves Tomahawk's long-range precision-strike capability while increasing responsiveness and flexibility. TACTOM is capable of in-flight retargeting, the ability to loiter over the battlefield, in-flight missile health and status monitoring, and battle damage indication. Other Tomahawk Weapon System functionality includes rapid mission planning and execution via Global Positioning System (GPS) onboard the launch platform and improved anti-jam GPS. The TACTOM service life for RGM109E and UGM109E Block IV/V Tomahawk cruise missiles is 30 years with a 15-year deployment and recertification cycle. During the Recertification availability period, Block IV TACTOMS will undergo their 15-year service life extension activities and are then updated to a modernized Block V configuration with the installation of a NAV/COMM kit. NAV/COMMs is a subprogram upgrade that consists of the Integrated Single Box Solution (ISBS) radio, two new antennas and associated cabling, a new mid-body cover, and changes to the aft-body structure and aft-body cover. The ISBS radio is replacing the existing Satellite Data Link Terminal (SDLT) and two new antennas are added to replace the previous antenna. The changes to the missile are driven by the obsolescence of the SDLT hardware and the obsolescence of the UHF Demand Assigned Multiple Access (DAMA) communications infrastructure that is being phased out of service. Maritime Strike Tomahawk (MST) is a subprogram that includes seeker kit hardware, assemblies/subassemblies, packaging and storage. Seeker kit hardware procurement includes the sensors, nosecone, ULTRA processor, cooling pump and plumbing, bulkhead, power and signal harnesses, power supply, plumbing and electrical chase insulators, telemetry unit, wiring, hybrid homopolar permanent magnet generator, and Primary Power Interface Unit. Includes modifying existing missile infrastructure to accept/install seeker kit components and assemblies into a modernized Block V missile during the Recertification availability period. Recertification is an ACAT II program to recertify the RGM109E and UGM109E Block IV/V Tomahawk cruise missiles service life subsequent to a 15-year deployment. Recertification activity include the costs associated with the Raytheon labor, vendor recertification of specific components (i.e. mechanical and electrical components), recertification of the MK 45 submarine capsule, missile consumables, fuze recertification, Armed Firing Device (AFD) recertification, installation of Advanced Communication Package (ACP), shipping assets to and from weapon stations, and fuel. Recertification is planned to occur concurrently with installation of NAV/COMMs Modernization Kits, which will replace the existing Satellite Data Link Terminal (SDLT) radio and antenna. M-Code is an ACAT IVT program that upgrades the TACTOM missile with the next generation, modernized Global Positioning System (GPS) capability. TACTOM M-Code kits consist of new Anti-Jam GPS Receiver (AGR) hardware/software and installation of the upgrade kit into TACTOM Block V AURs. Fielding of M-Code equipped AURs, enable TACTOM to be compliant with Public Law 111-38, sec 913. MCode kits will be installed into modernized Block V missiles during the Recertification availability. LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 1 of 15 P-1 Line #22 Volume 1 - 249 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2301 / Tomahawk Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A JMEWS is an ACAT III program to develop, produce, and field a new warhead for the Block V Tomahawk Cruise Missile. JMEWS expands the land target set that the Tomahawk missile is capable of defeating by combining existing blast and fragmentation with a new penetration capability and improved mission planning. JMEWS will also be compliant with Insensitive Munitions requirements, which improve safety during transportation and storage on land and aboard ships and submarines. JMEWS warheads will be installed into modernized Block V missiles during the Recertification availability. The FY 2026 spend plan for Tomahawk Mods includes $6,283 thousand of discretionary and $473,848 thousand of reconciliation for a total of $480,131 thousand. The reconciliation funds provide for: - 207 Recertified TACTOM BLK V for $142,038 thousand - 67 Recertified TACTOM BLK Va (MST) for $54,601 thousand - 234 NAV/COMMs kits for $19,024 thousand - 54 MST Kits for $172,800 thousand - MST cost overruns for $28,000 thousand - JMEWS long-lead material for $1,134 thousand - Support Equipment - Classified for $37,338 thousand - Associated Support Costs for $18,913 thousand The FY 2027 request for Tomahawk Mods includes $799,139 thousand of discretionary and $724,675 thousand of reconciliation for a total of $1,523,814 thousand. LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 2 of 15 P-1 Line #22 Volume 1 - 250 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2301 / Tomahawk Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a 1 / TACTOM NAV/COMMs Modernization and Recertification Kits (Increase Capability and Extend Missile Service Life) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code 289 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,245.745 - / 285.157 - / 6.283 - / 799.139 - / 0.000 - - / 1,245.745 - / 285.157 - / 6.283 - / 799.139 - / 0.000 - Exhibits Schedule Exhibit Type Title* P-3a 1 / TACTOM NAV/COMMs Modernization and Recertification Kits (Increase Capability and Extend Missile Service Life) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code 289 / 799.139 / 799.139 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,400.564 - / 1,428.153 - / 1,465.503 - / 1,485.223 - / 3,205.481 - / 11,321.248 - / 1,400.564 - / 1,428.153 - / 1,465.503 - / 1,485.223 - / 3,205.481 - / 11,321.248 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In 2026, the Tomahawk program entered a seven-year Multiyear Procurement (MYP), as authorized in Section 8010 (c) of the Consolidated Appropriations Act of 2026. The MYP strategy for Tomahawk expands the capacity of the Tomahawk production line from 600 All-Up-Rounds (AURs) per year to 1,068 AURs per year without additional government investment in capacity by leveraging savings to the contractor generated through economic order quantities of material from sub-vendors, enabled by the establishment of steady and consistent total order quantities from the government. Maintaining the total order quantities of Tomahawk AURs on the MYP consistently at 1,068 per year is critical to supporting the industrial base stability needed to achieve and sustain this increased production capacity. Total order quantities on the Tomahawk MYP are funded across multiple budgets and customers including the U.S. Navy, U.S. Army, and FMS cases, and are split as 718 new production AURs plus 350 Recertified AURs per year with 300 of the 1,068 AURs produced as a Maritime Strike Tomahawk (MST) variant. Due to the MYP commitment, any adjustment to order quantity by one customer must be offset by equal and opposite adjustment(s) by other customer(s) so that total quantities on the MYP remain consistent. The Tomahawk MYP Year 1 in 2026 was negotiated to include 912 total AURs, comprised of: - 562 new production AURs . - 318 funded in FY 2026 (55 U.S. Navy, 5 U.S. Army, 258 FMS) . - 244 funded in FY 2027 mandatory (reconciliation) (205 U.S. Navy, 39 U.S. Army) . - U.S. Navy quantities requested on the WPN-2101 Tomahawk exhibit . - U.S. Army quantities requested in the Missile Procurement, Army exhibit - 350 recertified AURs . - 296 funded in FY 2026 (274 U.S. Navy, 22 FMS) . - 54 funded in FY 2027 mandatory (reconciliation) (U.S. Navy) The 912 AURs included in MYP Year 1 will deliver in a 12-month period. 614 AURs funded with FY 2026 and FMS funding will deliver over the first 8 months, with the remaining 298 AURs requested in FY 2027 delivering in the final 4 months. The Munitions Acceleration Framework Agreement signed with RTX on January 27, 2026 established a quantity of 912 AURs for MYP Year 1 (FY 2026) due to capacity/ramp up constraints. The total quantity of 1,068 AURs per year begins with MYP Year 2 (FY 2027). LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 3 of 15 P-1 Line #22 Volume 1 - 251 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2301 / Tomahawk Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY 2027 budget request for the 1,068 AURs to be awarded under MYP Year 2 is scheduled to deliver within a 12-month period following the MYP Year 1 delivery period and is comprised as follows: - 580 Navy new production - 138 Army new production - 350 Navy recertifications - FY 2027 funding supports Recertification of a total of 404 AURs. Block IV assets with NAV/COMMs kits installed are re-designated as Block V: . - 54 Block IV assets and 54 NAV/COMMs upgrade kits on MYP Year 1 Option . - 350 Block IV assets, 350 NAV/COMMs upgrade kits, and 350 M-Code upgrades on MYP Year 2 Of the 404 BLK V AURs budgeted in FY 2027, 150 are converted into BLK Va (MST) with the installation of 150 MST Kits and 35 are converted into BLK Vb (JMEWS) with the installation of 35 JMEWS Kits. - FY 2027 funding supports the procurement of 404 NAV/COMMs upgrade kits. (350 MYP Year 2 / 54 MYP Year 1 Option) - FY 2027 funding includes the procurement of 150 Maritime Strike Tomahawk (MST) upgrade kits, which includes seeker kit hardware, assemblies/subassemblies, packaging, and storage. - FY 2027 funding includes the procurement of 350 M-Code upgrade kits. - FY 2027 funding includes the procurement of 35 JMEWS upgrade kits and material. The FY 2027 request for Tomahawk Mods includes $799,139 thousand of discretionary and $724,675 thousand of reconciliation for a total of $1,523,814 thousand. The discretionary funds provide for: - 77 Recertified TACTOM BLK V for $82,367 thousand - 50 Recertified TACTOM BLK Va (MST) for $63,185 thousand - 127 NAV/COMMs Kits for $26,286 thousand - 50 MST Kits for $163,360 thousand - 127 M-Code Kits for $6,740 thousand - Support Equipment - Classified for $439,415 thousand - Associated Support Costs for $17,786 thousand The reconciliation funds provide for: - 142 Recertified TACTOM BLK V for $150,302 thousand (88 MYP Year 2 / 54 MYP Year 1 Option) - 100 Recertified TACTOM BLK Va (MST) for $126,369 thousand - 35 Recertified TACTOM BLK Vb (JMEWS) for $42,306 thousand - 277 NAV/COMMs Kits for $41,997 thousand (223 MYP Year 2 / 54 MYP Year 1 Option) - 100 MST Kits for $326,720 thousand - 223 M-Code Kits for $11,836 thousand - 35 JMEWS Upgrade Kits and Material for $14,660 thousand - Associated Support Costs for $10,485 thousand Tomahawk production line is shared across new production Tomahawks and Tomahawk modifications/recertifications. Variability in recertification quantities across the FYDP is balanced across all customers. (Navy and FMS Cases) LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 4 of 15 P-1 Line #22 Volume 1 - 252 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2301 / Tomahawk Mods ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,245.745 1,245.745 1,245.745 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 285.157 285.157 285.157 6.283 6.283 6.283 799.139 - 0.000 - 799.139 - 0.000 - 799.139 0.000 799.139 799.139 799.139 1,400.564 1,428.153 - - 1,400.564 1,428.153 - - 1,400.564 1,428.153 1,465.503 To FY 2031 Complete 1,485.223 1,465.503 1,485.223 1,465.503 1,485.223 Total 3,205.481 11,321.248 3,205.481 11,321.248 3,205.481 11,321.248 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The TACTOM Modernization profile includes: Recertification: Mid-life recertification of RGM109E and UGM109E Block IV Tomahawk cruise missiles, extending total service life to 30 years. Navigation Communication Modernization upgrades (NAV/COMMs): Integrates updated antennas and radios into a Tactical Tomahawk, migrating Tomahawk out of the UHF Demand Assigned Multiple Access (DAMA) communications infrastructure; upgraded missile designated as Block V. Maritime Strike Tomahawk (MST): Integrates a seeker and supporting hardware into a Tactical Tomahawk to provide a Maritime Strike capability; upgraded missile designated as Block Va. Military Code (M-Code): Integrates new Anti-Jam GPS Receiver (AGR) hardware/software into the Tactical Tomahawk (all variants) for compliance with Public Law 111-38, sec 913. Joint Multiple Effects Warhead System (JMEWS): Integrates a new warhead into a Tactical Tomahawk expanding the land target set and providing compliance with Insensitive Munitions requirements; upgraded missile designated as Block Vb. [Recertification TACTOM BLK V] Installation costs for Recertification TACTOM BLK V/Va/Vb, NAV/COMMs kits, MST kits, M-Code kits, and JMEWS kits are included in the costs of the All Up Round Recertification reflected in cost elements 1.1.1, 1.1.2, and 1.1.3, reflecting how the modifications are actually contracted. In the P-3a for FY 2026 and FY 2027, quantities listed are the total quantity budgeted across both discretionary and mandatory (reconciliation) funding and the funding listed is only the discretionary funding amount. The reconciliation funding amount and the quantity breakout between discretionary and reconciliation is listed in the footnote for each cost element with a quantity. LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 5 of 15 P-1 Line #22 Volume 1 - 253 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Models of Systems Affected: TACTOM Related RDT&E PEs: 0204229N Modification Type: Increase Capability and Extend Missile Service Life Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 5: TACTOM BLK V A Kits Recurring 1.1.1) Recertification TACTOM BLK V - NonOrganic (1) 672 / 260.185 164 / 141.642 - / - - / - - / - - / - - / - - / - 1.1.2) MYP Year 1 Option Recertification TACTOM BLK V - NonOrganic (2) 1.1.3) Recertification TACTOM BLK Va (MST) NonOrganic (3) 1.1.4) Recertification TACTOM BLK Vb (JMEWS) NonOrganic (4) Subtotal: Recurring / 260.185 / 141.642 165 / 82.367 - / - 165 / 82.367 162 / 176.931 162 / 181.080 136 / 146.719 / - 54 / 0.000 - / - 54 / 0.000 - - - 67 / 0.000 150 / 63.185 - / - 150 / 63.185 150 / 193.534 150 / 197.598 150 / 201.748 150 / 183.375 35 / 0.000 - / - 35 / 0.000 38 / 46.885 38 / 47.436 64 / 82.362 120 / 139.018 - - / - - / - - 54 / 0.000 / - 300 / 374.452 - / 70.226 - / - - - / - 404 / 145.552 350 / 417.350 350 / 426.114 350 / 430.829 350 / 403.328 996 / 1,154.598 968 / 142.752 103 / 20.451 234 / 0.000 350 / 26.286 - / - 350 / 26.286 350 / 73.963 350 / 75.516 350 / 77.101 350 / 78.721 54 / 0.000 - / - 54 / 0.000 - / 403.328 / - / 145.552 - / 430.829 - 404 / 145.552 - / 426.114 / - 2,444 / 1,779.779 274 / 0.000 - / 417.350 / - 696 / 709.920 164 / 141.642 - / 145.552 / - 80 / 80.935 672 / 260.185 - Subtotal: TACTOM BLK V 207 / 0.000 - / 1,154.598 - 1,117 / 1,213.892 295 / 385.927 / 3,379.598 - 3,910 / 3,379.598 Modification Item 2 of 5: NAV/COMMs A Kits Recurring 2.1.1) NAV/COMMs - NonOrganic (5) 2.1.2) MYP Year 1 Option NAV/COMMs - NonOrganic - (6) Subtotal: Recurring / 142.752 - / - / 20.451 - / - - / - - - - - - - / - - - / - 404 / 26.286 350 / 73.963 350 / 75.516 350 / 77.101 350 / 78.721 114 / 249.262 20 / 64.399 54 / 0.000 150 / 163.360 - / - 150 / 163.360 150 / 500.372 150 / 510.879 150 / 521.608 150 / 532.562 364 / 1,210.741 - - - / 78.721 / - / 26.286 - / 77.101 766 / 175.905 3,821 / 670.695 / - 404 / 26.286 - / 75.516 / - 234 / 0.000 - / 73.963 / - 103 / 20.451 - / 26.286 / - 968 / 142.752 - Subtotal: NAV/COMMs / - - 54 / 0.000 / 175.905 / 670.695 - 766 / 175.905 3,875 / 670.695 Modification Item 3 of 5: MST A Kits Recurring 3.1.1) MST - NonOrganic (7) 3.1.2) MST - Prior Year Cost Overrun - NonOrganic Subtotal: Recurring Subtotal: MST LI 2301 - Tomahawk Mods Navy - (8) - / 51.550 / 300.812 114 / 300.812 - / 1.458 - / - / 65.857 - / - 20 / 65.857 54 / 0.000 / - - / - / 163.360 - / - - 150 / 163.360 - / - 150 / 163.360 - UNCLASSIFIED Page 6 of 15 - / - / 163.360 - / - / 500.372 150 / 500.372 - / - / 510.879 150 / 510.879 P-1 Line #22 - / - / 521.608 150 / 521.608 - / - / 532.562 - 1,302 / 3,753.183 / - / 1,210.741 150 / 532.562 364 / 1,210.741 - / 53.008 / 3,806.191 1,302 / 3,806.191 Volume 1 - 254 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: 289 Models of Systems Affected: TACTOM Related RDT&E PEs: 0204229N Modification Type: Increase Capability and Extend Missile Service Life Prior Years Financial Plan Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 4 of 5: M-CODE-CAPABLE GPS USER EQUIPMENT (MGUE) A Kits Recurring 4.1.1) M-Code - Organic - (9) Subtotal: Recurring - Subtotal: M-CODE-CAPABLE GPS USER EQUIPMENT (MGUE) - / - - / - - / - 350 / 6.740 - / - 350 / 6.740 / 0.000 - / - - / - - / 6.740 - / - - 350 / 18.966 / - - / - - / - 350 / 6.740 - / - 350 / 6.740 350 / 18.966 350 / 19.364 350 / 19.771 350 / 20.186 35 / 0.000 - / - 35 / 0.000 38 / 16.251 38 / 16.592 64 / 28.532 120 / 54.621 1,035 / 474.958 1,330 / 602.306 / 6.740 350 / 19.364 / 18.966 - 350 / 19.771 / 19.364 - 350 / 20.186 / 19.771 - 914 / 50.524 2,664 / 135.551 / 20.186 - / 50.524 - / 135.551 - 914 / 50.524 2,664 / 135.551 Modification Item 5 of 5: JMEWS A Kits Recurring 5.1.1) JMEWS - Organic (10) Subtotal: Recurring Subtotal: JMEWS Subtotal: Procurement, All Modification Items - / 7.688 - / 3.664 - / - - / 7.688 - / 3.664 - / - - / 7.688 - / 3.664 - / - / 231.614 - / - / 711.437 - - / - - / - 35 / 0.000 - / - / 341.938 - / - - - - / - / 341.938 - / 16.251 - 35 / 0.000 / 1,026.902 - / 16.592 - 38 / 16.251 / 1,048.465 - / 28.532 - 38 / 16.592 / 1,077.841 - / 54.621 - 64 / 28.532 / 474.958 - / 602.306 - 120 / 54.621 1,035 / 474.958 1,330 / 602.306 / 1,089.418 - / 3,066.726 - / 8,594.341 - Support (All Modification Items) 6.1) Other Production Support 6.2) Support Equipment 6.3) Integrated Logistics Support 6.4) MK-45 Support - (11) / 109.349 - / 9.918 / 17.786 - / - / 16.517 - / 80.863 - / 59.675 - / 3.680 - / - - / - - / - - / - - / 4.398 - / 4.416 - / 4.438 - / 4.527 - / 21.065 - - / 6.381 - / 1.693 - / - - / - - / - - / - - / 1.786 - / 1.830 - / 1.839 - / 1.876 - / 9.212 - - / - - / 5.905 - / 6.053 - / 6.083 - / 6.205 - (12) (13) (15) Subtotal: Support - / 6.283 - - / 17.786 - / 15.273 - / 15.638 - / 16.164 - / 3.686 - / - / - - / - - / 209.952 - / 34.566 - / - - / 439.415 - / - - / 439.415 - / 346.300 - / 351.751 - / 359.138 - / 366.680 - / 394.569 - / 53.543 - / 6.283 - / 457.201 - / - - / 457.201 - / 373.662 - / 379.688 - / 387.662 - / 395.805 (14) 6.5) Support Equipment - Classified - - / 9.249 / 27.578 - - / 287.791 / 102.199 - / 24.654 - / 64.722 / - - / 2,107.802 / 138.755 - / 2,587.168 Installation Modification Item 1 of 5: TACTOM BLK V - Modification Item 2 of 5: NAV/COMMs Modification Item 3 of 5: MST Subtotal: Installation / 119.511 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / 15.070 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / 5.158 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / - - / 0.000 - / 139.739 - / - - / - - / - - / - - / - - / - - / - - / - - - / 119.511 - / 15.070 - - / 5.158 / 139.739 Total LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 7 of 15 P-1 Line #22 Volume 1 - 255 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: 289 Models of Systems Affected: TACTOM Modification Type: Increase Capability and Extend Missile Service Life Prior Years Financial Plan Total Cost (Procurement + Support + Installation) LI 2301 - Tomahawk Mods Navy Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: 0204229N FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 1,245.745 285.157 6.283 799.139 0.000 UNCLASSIFIED Page 8 of 15 799.139 1,400.564 1,428.153 P-1 Line #22 1,465.503 1,485.223 3,205.481 11,321.248 Volume 1 - 256 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 1 of 5: TACTOM BLK V Manufacturer Information Manufacturer Name: RAYTHEON Company (BLK V Recertification) Manufacturer Location: TUCSON, AZ (16) Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 31 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2026 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates May 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Dec 2032 Dec 2033 Manufacturer Name: RAYTHEON Company (BLK Va MST Recertification) Manufacturer Location: TUCSON, AZ (17) Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 40 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates May 2026 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates Sep 2027 Sep 2029 Sep 2031 Sep 2032 Sep 2033 Sep 2034 Sep 2030 Manufacturer Name: RAYTHEON Company (BLK Vb JMEWS Recertification) Manufacturer Location: TUCSON, AZ (18) Administrative Leadtime (in Months): 7 Dates Production Leadtime (in Months): 31 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2025 FY 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates Dec 2029 Dec 2030 Dec 2031 Dec 2032 Dec 2033 Installation Information Method of Implementation: Contractor:: Installation Name: Recertification TACTOM BLK V Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 454 / 119.511 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 454 / 119.511 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 9 of 15 P-1 Line #22 Volume 1 - 257 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 1 of 5: TACTOM BLK V Installation Information Method of Implementation: Contractor:: Installation Name: Recertification TACTOM BLK V Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - 0 / 0.000 454 / 119.511 Total 454 / 119.511 / - / - / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 454 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 454 Out 382 36 36 - - - - - - - - - - - - - - - - - - - - - - - - - - - 454 LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 10 of 15 P-1 Line #22 Volume 1 - 258 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 2 of 5: NAV/COMMs Manufacturer Information Manufacturer Name: RAYTHEON Company (NAV/COMMs) Manufacturer Location: TUCSON, AZ (19) Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 31 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates Jun 2026 Jun 2027 Aug 2028 Aug 2029 Aug 2030 Aug 2031 Aug 2032 Installation Information Method of Implementation: Contractor:: Installation Name: NAV/COMMs Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 586 / 15.070 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 586 / 15.070 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 586 / 15.070 586 / 15.070 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 586 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 586 Out 394 42 42 54 54 - - - - - - - - - - - - - - - - - - - - - - - - - 586 LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 11 of 15 P-1 Line #22 Volume 1 - 259 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2301 / Tomahawk Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 3 of 5: MST Manufacturer Information Manufacturer Name: RAYTHEON Company (MST Kit) Manufacturer Location: TUCSON, AZ (20) Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 37 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2026 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates Apr 2029 Jun 2029 Jun 2030 Jun 2031 Jun 2032 Jun 2033 Jun 2034 Installation Information Method of Implementation: Contractor:: Installation Name: MST Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 35 / 5.158 42 / 0.000 77 / 5.158 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - 42 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 35 / 5.158 77 / 5.158 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 35 - - 42 - - - - - - - - - - - - - - - - - - - - - - - - - - 77 Out - - - - 20 19 19 19 - - - - - - - - - - - - - - - - - - - - - - 77 LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 12 of 15 P-1 Line #22 Volume 1 - 260 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2301 / Tomahawk Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 4 of 5: M-CODE-CAPABLE GPS USER EQUIPMENT (MGUE) LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 13 of 15 P-1 Line #22 Volume 1 - 261 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2301 / Tomahawk Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 Modification Item 5 of 5: JMEWS Footnotes: (1) Cost Element Recertification TACTOM BLK V - FY 2027 includes $82,367 thousand discretionary funding for 77 Recertified TACTOM BLK V plus reconciliation funding for 88 Recertified TACTOM BLK V for $94,134 thousand, for a total of 165 / $176,501 thousand. MYP Year 2 unit cost per Recertified TACTOM BLK V is $1,069.703 thousand. FY 2026 includes $0 discretionary funding plus reconciliation funding for 207 Recertified TACTOM BLK V for $142,038 thousand. MYP Year 1 unit cost per Recertified TACTOM BLK V is $686,174 thousand. FY 2026 total Recertification quantities increased from 260 by 14 to 274. FY 2026 unit cost does not include FY 2025 and FY 2026 WPN6 and FY 2025 WPN2 applied to Multi-Year Procurement in support of Lot 7 (FY 2026) as funding for long-lead materials. Starting in FY 2027, funding for long-lead materials has been consolidated into the WPN-2301 budget line and is included in the budgeted unit cost. Tomahawk production line is shared across new production Tomahawks and Tomahawk modifications/recertifications. Variability in recertification quantities across the FYDP is balanced across all customers (Navy and FMS Cases). (2) Cost Element MYP Year 1 Option Recertification TACTOM BLK V - FY 2027 includes $0 thousand discretionary funding plus reconciliation funding for 54 Recertified TACTOM BLK V for $56,168 thousand. MYP Year 1 Option unit cost per Recertified TACTOM BLK V is $1,040.148 thousand. Costs reported under this element include costs for FY 2026 Option Year 1 to MYP Contract. (3) Cost Element Recertification TACTOM BLK Va (MST) - FY 2027 includes $63,185 thousand discretionary funding for 50 Recertified TACTOM BLK Va (MST) plus reconciliation funding for 100 Recertified TACTOM BLK Va (MST) for $126,369 thousand, for a total of 150 / $189,554 thousand. MYP Year 2 unit cost per Recertified TACTOM BLK Va (MST) is $1,263.693 thousand. FY 2026 includes $0 discretionary funding plus reconciliation funding for 67 Recertified TACTOM BLK Va (MST) for $54,601 thousand. MYP Year 1 unit cost per Recertified TACTOM BLK Va (MST) is $814,940 thousand. FY 2026 unit cost does not include FY 2025 and FY 2026 WPN6 and FY 2025 WPN2 applied to Multi-Year Procurement in support of Lot 7 (FY 2026) as funding for long-lead materials. Starting in FY 2027, funding for long-lead materials has been consolidated into the WPN-2301 budget line and is included in the budgeted unit cost. MST Hardware costs are accounted for in CE 3.1.1. (4) Cost Element Recertification TACTOM BLK Vb (JMEWS) - FY 2027 includes $0 discretionary plus reconciliation funding for 35 Recertified TACTOM BLK Vb (JMEWS) for $42,306 thousand. MYP Year 2 unit cost per TACTOM BLK Vb (JMEWS) is $1,208.743 thousand. JMEWS Hardware costs are accounted for in CE 5.1.1. (5) Cost Element NAV/COMMs - FY 2027 includes $26,286 thousand discretionary funding for 127 NAV/COMMs Kits (Radios and Antennas) (unit cost $206.976 thousand) plus reconciliation funding for 3 NAV/ COMMs Radios for $206 thousand (unit cost $68.667 thousand) and 223 NAV/COMMs Antennas for $30,844 thousand (unit cost $138.314 thousand), for a total reconciliation funding of $31,050. Program procured 220 radios with prior year funding that are being used in FY 2027 (Lot 8) recertifications. Commencing with Recertification Lot 8 (FY 2027), Radios and Antennas will no longer be procured as longlead for Lot 8 (FY 2027) and will be procured in the same year as the recertification. FY 2026 includes $0 discretionary funding plus reconciliation funding for 234 NAV/COMMs Radios for $15,379 thousand (unit cost $65.722 thousand) and 14 NAV/COMMs Antennas for $3,645 thousand (unit cost $260.357 thousand) totaling $19,024 thousand. Starting in FY 2026, Antennas have been incorporated into the Fixed Price Incentive Fee Multi-Year Procurement for the Tomahawk program and will be procured in the same year as the recertification. Program procured 260 Antennas with prior year funding that will be provided as Government Furnished Property (GFP) plus 14 procured in FY 2026 to be used in Lot 7 (FY 2026) recertifications. Program procured 234 Radios with FY 2026 funds,14 will be used on Lot 7 (FY 2026) and the remaining 220 become Government Furnished Property (GFP) to Lot 8 (FY 2027). (6) Cost Element MYP Year 1 Option NAV/COMMs - FY 2027 includes $0 discretionary funding plus reconciliation funding for 54 NAV/COMMs Kits (Radios and Antennas) for $10,947 thousand. Costs reported under this element include costs for FY 2026 Option Year 1 to MYP Contract. MYP Year 1 Option unit cost per NAV/COMMs Kit is $202.722 thousand. (7) Cost Element MST Kits - FY 2027 includes $163,360 thousand discretionary funding for 50 MST Kits plus reconciliation funding for 100 MST Kits for $326,720 thousand, for a total of 150 / $490,080 thousand. MYP Year 2 unit cost per MST Kit is $3,267.200 thousand. FY 2026 includes $0 discretionary funding plus reconciliation funding for 54 MST Kits for $172,800 thousand. MYP Year 1 unit cost per MST Kit is $3,200 thousand. MST Kits will no longer be procured as long-lead for Lot 8 (FY 2027) and will be procured at same year of recertification. MST kit unit cost increases from previous budget submissions are due to realized actual costs for LRP-1 through LRP-3, updated cost data from LRP-4/5/6 negotiations and the transition from cost-type contracting to fixed-price contracting. (8) Cost Element MST - Prior Year Cost Overrun - FY 2026 includes $0 discretionary funding plus reconciliation funding for MST cost overruns for $28,000 thousand. This cost element reflects funding awarded to the LRP-1 (FY 2021-funded), LRP-2 (FY 2022-funded) and LRP-3 (FY 2023 funded) contract overrun due to amount of troubleshooting and rework realized for the Processor and Sensor assemblies. These over-runs are ongoing and may result in additional costs as these cost-plus contracts progress through final deliveries and closeout. The $22.717M in FY 2023 is attributed to LRP-1. The $4.441M in FY 2024 is attributed to LRP-1 and the $24.932M in FY 2024 is attributed to LRP-2. The $1.458M in FY 2025 is attributed to LRP-1 and LRP-2. The $28M in FY 2026 is attributed to LRP-3 which is currently an estimate until costs are finalized. (9) Cost Element M-Code Kits - FY 2027 includes $6,740 thousand discretionary funding for 127 M-Code Kits plus reconciliation funding for 223 M-Code kits for $11,836 thousand, for a total of 350 / $18,576 thousand (unit cost per M-Code Kit is $53.074 thousand). LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 14 of 15 P-1 Line #22 Volume 1 - 262 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2301 / Tomahawk Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TACTOM NAV/COMMs Modernization and Recertification Kits MDAP/MAIS Code: 289 (10) Cost Element JMEWS Kits - FY 2027 includes $0 thousand discretionary funding plus reconciliation funding for 35 Upgrade Kits and Material for $14,660 thousand (unit cost per JMEWS Kit is $418.857 thousand). FY 2026 includes $0 discretionary funding plus reconciliation funding for JMEWS long-lead material for $1,134 thousand. Funding supports the procurement of JMEWS Kits to be provided as GFP to the Recertification Contract for TACTOM BLK V JMEWS AURs. (11) Cost Element Other Production Support - FY 2027 includes discretionary funding for $17,786 thousand plus reconciliation funding for Other Production Support for $1,856 thousand, for a total of $19,642 thousand. The increase in funding from FY 2026 to FY 2027 is due to an expected increase in support necessitated by the rapid production capacity increase enabled by the Tomahawk Multiyear Procurement contract initiated in FY 2026. FY 2026 includes discretionary funding for $6,283 thousand plus reconciliation funding for Other Production Support for $9,809 thousand, for a total of $12,862 thousand. Includes unique government and contractor production support and recurring fixed costs that are required per Recertification lot and per production lot of NAV/COMMs kits, MST kits, M-Code kits and JMEWS kits. Funding includes engineering support to include hardware repairs, obsolescence mitigation, production line support, software upgrades, crypto support, production capacity analysis and increases, and the replacement of FMU-148A/B fuzes due to high test failure rate. (12) Cost Element Support Equipment - FY 2027 includes $0 discretionary funding plus reconciliation funding for Support Equipment for $4,239 thousand. The increase in funding from FY 2026 to FY 2027 is due to an expected increase in support necessitated by the rapid production capacity increase enabled by the Tomahawk Multiyear Procurement contract initiated in FY 2026. FY 2026 includes $0 discretionary funding plus reconciliation funding for Support Equipment for $4,205 thousand. Includes unique support and test equipment required to support the recertified TACTOM, NAV/COMMs kits, MST kits, M-Code kits, and JMEWS kits. Funding includes planning, resourcing, and implementing management actions to acquire and support the equipment required to sustain and validate the Recertified capability/functionality. (13) Cost Element Integrated Logistics Support - FY 2027 includes $0 discretionary funding plus reconciliation funding for Integrated Logistics Support for $1,750 thousand. The increase in funding from FY 2026 to FY 2027 is due to an expected increase in support necessitated by the rapid production capacity increase enabled by the Tomahawk Multiyear Procurement contract initiated in FY 2026. FY 2026 includes $0 discretionary funding plus reconciliation funding for Integrated Logistics Support for $1,724 thousand. Costs reported under this element combine costs previously reported under Integrated Logistics Support broken out by multiple programs. Includes costs for support equipment management, computer resources support, training and training support, ILS program management, and packaging, handling, storage and transportation as associated with the Recertified TACTOM. (14) Cost Element MK-45 Support - Recertification - FY 2027 includes $0 discretionary funding plus reconciliation funding for MK 45 support for $3,240 thousand. The increase in funding from FY 2026 to FY 2027 is due to an expected increase in support necessitated by the rapid production capacity increase enabled by the Tomahawk Multiyear Procurement contract initiated in FY 2026. FY 2026 includes $0 discretionary funding plus reconciliation funding for MK 45 support for $3,176 thousand. Funding is required to recertify and fund the Non-Recurring Engineering (NRE) associated with recertification and to address obsolescence related to extending the service life of the Composite Capsule Launching System (CCLS) barrels and associated hardware. Funding also reflects procurement of replacement Capsule Launching System (CLS) hardware, support for CLS test equipment parts, and associated CLS maintenance. (15) Cost Element Support Equipment - Classified - Details held at a higher classification. FY 2027 includes $439,415 thousand discretionary funding plus reconciliation funding for Support Equipment - Classified for $0 thousand. FY 2026 includes $0 discretionary funding plus reconciliation funding for Support Equipment - Classified for $37,338 thousand. (16) (17) (18) (19) (20) Production lead time and dates of first deliveries align with Tomahawk Multiyear Procurement (MYP) contract. Production lead time and dates of first deliveries align with Tomahawk Multiyear Procurement (MYP) contract. Production lead time and dates of first deliveries align with Tomahawk Multiyear Procurement (MYP) contract. Production lead time and dates of first deliveries align with Tomahawk Multiyear Procurement (MYP) contract. Production lead time and dates of first deliveries align with Tomahawk Multiyear Procurement (MYP) contract. LI 2301 - Tomahawk Mods Navy UNCLASSIFIED Page 15 of 15 P-1 Line #22 Volume 1 - 263 === page 304 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 264 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 1,583 374 305 290 - 290 302 330 342 343 Continuing 2,611.601 624.821 503.381 521.006 521.006 551.272 599.196 637.568 650.476 Continuing 2,611.601 2,611.601 624.821 624.821 503.381 503.381 - 0.000 - 521.006 - 0.000 - 521.006 0.000 521.006 521.006 551.272 551.272 599.196 599.196 637.568 637.568 To FY 2031 Complete 650.476 Continuing - Continuing 650.476 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - 1,650K 1,671K 1,650K 1,797K - 1,797K 1,825K 1,816K 1,864K 1,896K Continuing Continuing Description: The Evolved SEASPARROW Missile (ESSM) Program is an international cooperative effort among twelve NATO SEASPARROW nations (Australia, Belgium, Canada, Denmark, Germany, Greece, Netherlands, Norway, Portugal, Spain, Turkey, and the U.S.) established to design, develop, test, produce and provide in-service support to a new and improved version of the SPARROW missile (RIM-7P) with the kinematic performance to defeat current and projected threats that possess low altitude, high velocity, and maneuvering characteristics beyond the engagement capabilities of the RIM-7P. ESSM consists of Blk 1 and Blk 2 missiles. ESSM Blk 2 provides crucial defense battlespace and fire power against the fast, low altitude, highly maneuverable Anti-Ship Cruise Missile (ASCM) threat. ESSM Blk 2 upgrade replaces the largely obsolete guidance section with a dual mode Active/Semi-Active X-Band seeker capable of defeating future threat capabilities within the existing envelope, including: smaller signatures, increased raid sizes, and adverse environments including countermeasures. Threat types include advanced ASCMs, Low Velocity Air Targets, surface, and asymmetrical. Developmental and Operational Testing were conducted throughout 2020 and into 2021 from AEGIS destroyers and the Self Defense Test Ship. Production deliveries began in 2021 with Full Rate Production (FRP) decision in FY 2026 for Fleet delivery round. FRP decision schedule is being driven by availability of ships to conduct Initial Operational Test and Evaluation (IOT&E) Phase 2 testing of missiles in an Optimized integration. IOC was successfully completed in December 2021. Full Operational Capability with Optimized implementation for AEGIS to make full use of capability resident in the missile, and a Functional implementation for SSDS platforms is scheduled for 2026. Production Support (Producibility/Procurement, Security Infrastructure, Hardware Maintenance, and Configuration Management) for ESSM Blk 2 reflects the U.S. Share under the cooperative Memorandum of Understanding (MOU) with Consortium Partners. The US is responsible for approximately 45% of the missile production support under this approved MOU. While there is not a one-to-one relationship between yearly missile quantities and the amount of production support necessary for Blk2, an increase in missile quantity will drive some increase in production support. LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 1 of 18 P-1 Line #23 Volume 1 - 265 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 Exhibits Schedule Exhibit Type Title* P-5 1 / Evolved Sea Sparrow Missile (ESSM) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1,583 / 2,611.601 374 / 624.821 305 / 503.381 290 / 521.006 - / 0.000 290 / 521.006 1,583 / 2,611.601 374 / 624.821 305 / 503.381 290 / 521.006 - / 0.000 290 / 521.006 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Overall increase in funding from FY 2026 to FY 2027 due to the new ESSM Blk 2 Production AUR contract award in FY 2027. FY 2027 AUR estimates are higher than the confirmed AUR unit cost in FY 2026. FY 2027 AUR unit costs is a current estimate anticipated for the FY 2027 ESSM Blk 2 AUR Award. There is a decrease in the procurement of ESSM Blk 2 AURs in FY 2027 for US QTYs due to current program estimated AUR cost. Decrease in the quantity of missiles (from 305 in FY 2026 to 290 in FY 2027) does not necessarily mean a decrease in the total amount of overall missiles due to the Consortium quantities. Current procurement intent for the entire Consortium is at max capacity through FY 2030. Decrease in FY 2027 Missile Obsolescence funding: FY 2027 funding will continue work for designing out obsolete parts associated with the following: 1.) Side-Looking-Subsystem (SLS) Signal Processor (SP) Circuit Card Assembly (CCA); 2.) Form-Fit-Function (F3R) re-spins of the Dual Band Transceiver (DBT) Frequency Reference Unit (FRU); and 3.) F3R re-spins of the FRU Oscillator, Frequency Generator, and Radio Frequency (RF). FY 2027 efforts include adding re-spins of the control section electronic control unit (ECU). This critical component will be obsolete because as of now there is no commercially available replacement. FY 2027 funding increase in MK 25 MOD 1 Canisters is due to an increase in the procurement quantity from 71 in FY 2026 to 72 in FY 2027 to accommodate missile procurement and specific ship destination. Unit prices in FY 2027 and out are estimates based upon the current contract. Negotiated unit costs will be updated upon contract award. FY 2027 funding decrease in MK852 Mod 0 Shipping containers is due to a decrease in the quantity being procured. MK852 Mod 0 Shipping containers go to Ship Self Defense System (SSDS) to be loaded. Increase in production support from FY 2026 to FY 2027 reflects ESSM QTY buys. Production Support reflects the US share of the ESSM Blk 2 Production Memorandum of Understanding (MOU) estimate for FY 2026. The estimated amounts (phasing for the Production MOU) are based on the updated life-cycle cost estimate completed during MS C (March 2019). LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 2 of 18 P-1 Line #23 Volume 1 - 266 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 305 290 2,611.601 624.821 503.381 521.006 - - 2,611.601 Plus CY Advance Procurement ($ in Millions) - 624.821 - Total Obligation Authority ($ in Millions) FY 2027 OOC 374 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 1,583 - 2,611.601 - 0.000 - 503.381 521.006 - 521.006 - 624.821 290 0.000 - 503.381 FY 2027 Total - 521.006 - 521.006 - 0.000 521.006 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - 1,650K 1,671K 1,650K 1,797K - 1,797K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - ESSM MISSILES Cost Recurring Cost 1.1.1) MK 41 AEGIS ALL UP ROUND MISSILE 876,463.10 542 475.043 - - - - - - - - - - - - - - - 817,624.73 461 376.925 - - - - - - - - - - - - - - - 1,215K 30 36.455 - - - - - - - - - - - - - - - 858,500.00 20 17.170 - - - - - - - - - - - - - - - 1,541K 648 998.833 1,351K 374 1,351K 305 1,520K 290 - - - 1,520K 290 70,647.54 244 17.238 - - - - - - - - - - - - - - - - - 27.496 - - 16.095 - - 13.995 - - 1.440 - - - - - 1.440 Subtotal: Recurring Cost - - 1,949.160 - - 521.369 - - 426.050 - - 442.240 - - - - - 442.240 Subtotal: Hardware - ESSM MISSILES Cost - - 1,949.160 - - 521.369 - - 426.050 - - 442.240 - - - - - 442.240 (†) HARDWARE 1.1.2) MK 29 ALL UP ROUNDS MISSILE (†) HARDWARE 1.1.3) MK 57 ALLUP ROUNDS MISSILE (†) HARDWARE 1.1.4) MK 41 X-BAND ALL UP ROUNDS MISSILE HARDWARE 1.1.5) ESSM BLOCK 2 (†) (1) 1.1.6) WARHEAD COMPATIBLE TELEMETER 1.1.7) Missile Obsolescence (2) 505.274 412.055 440.800 440.800 Hardware - MK25 QUADPACK CANISTERS Cost LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 3 of 18 P-1 Line #23 Volume 1 - 267 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Unit Cost 306 143.239 655,645.00 - 3.430 90 3.534 Qty (Each) ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Recurring Cost 2.1.1) MK 25 QUADPACK (†) (3) CANISTERS 2.1.2) MK25 MOD 1 MK8 Bolts 2.1.3) MK 852 Mod 0 (†) (4) (Blk2 Shipping) 468,101.31 39,266.67 48,678.59 94 61.631 - 3.507 29 1.412 675,618.00 48,678.59 71 47.969 - 2.040 28 1.363 696,202.00 - 72 50.127 - - - - 2.081 - - - 0.080 - - - 40,068.00 2 696,202.00 - 72 50.127 - 2.081 40,068.00 2 0.080 Subtotal: Recurring Cost - - 150.203 - - 66.550 - - 51.372 - - 52.288 - - - - - 52.288 Subtotal: Hardware - MK25 QUADPACK CANISTERS Cost - - 150.203 - - 66.550 - - 51.372 - - 52.288 - - - - - 52.288 154,150.00 20 3.083 - - - - - - - - - - - - - - - 91,800.00 20 1.836 - - - - - - - - - - - - - - - 62,000.00 3 0.186 - - - - - - - - - - - - - - - 22,700.00 20 0.454 - - - - - - - - - - - - - - - 5,150.00 20 0.103 - - - - - - - - - - - - - - - 56,000.00 10 0.560 - - - - - - - - - - - - - - - Hardware - SHIPPING CONTAINERS Cost Recurring Cost 3.1.1) CMBRE Procurement (†) (5) 3.1.2) CMBRE Adaptors (†) 3.1.3) CMBRE SPARES (†) 3.1.4) CMBRE Power (†) Supply 3.1.5) CMBRE Cables (†) 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers (†) 3.1.7) ROCKET MOTORS (SEASPARROW) - - 6.396 - - - - - - - - - - - - - - - 3.1.8) Test Equipment - - 16.103 - - - - - - - - - - - - - - - 3.1.9) Production Capacity - - 35.991 - - - - - - - - - - - - - - - 467 4.246 - - - - - - - - - - - - - - - - 68.958 - - - - - - - - - - - - - - - 3.1.10) ESSM SHIPPING (†) CONTAINERS Subtotal: Recurring Cost 9,092.08 - LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 4 of 18 P-1 Line #23 Volume 1 - 268 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware SHIPPING CONTAINERS Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 68.958 - - - - - - - - - - - - - - - 4.1) PROCUREMENT SUPPORT - - 268.796 - - - - - - - - - - - - - - - 4.2) TOOLING AND TEST SUPPORT - - 42.734 - - - - - - - - - - - - - - - 4.3) DIMINISHING MANUFACTURING SERVICES - - 8.531 - - - - - - - - - - - - - - - 4.4) PERFORMANCE CHARACTERIZATION - - 29.924 - - - - - - - - - - - - - - - 4.5) ILS/FLEET DOCUMENTATION - - 4.024 - - - - - - - - - - - - - - - - - 33.303 - - 17.293 - - 12.272 - - 12.517 - - - - - 12.517 - - 12.150 - - - - - - - - - - - - - - - - - 33.171 - - 14.431 - - 10.023 - - 10.224 - - - - - 10.224 (8) - - 2.129 - - 1.552 - - 0.962 - - 0.981 - - - - - 0.981 4.10) HARDWARE/ MAINTENANCE - - 8.518 - - 3.626 - - 2.702 - - 2.756 - - - - - 2.756 Subtotal: Support Cost - - 443.280 - - 36.902 - - 25.959 - - 26.478 - - - - - 26.478 Gross/Weapon System Cost 1,650K 1,583 2,611.601 1,671K 374 624.821 1,650K 305 503.381 1,797K 290 521.006 - - 0.000 1,797K 290 521.006 Support Cost 4.6) PRODUCIBILITY/ PROCUREMENT SUPPORT (6) 4.7) COMPONENT IMPROVEMENT/ECPS 4.8) SECURITY/ INFRASTRUCTURE SUPPORT (7) 4.9) CONFIGURATION MANAGEMENT SUPPORT (†) (9) indicates the presence of a P-5a Footnotes: (1) FY 2024 - FY 2026 contract(s) were negotiated for the same unit cost at $1.351M per missile. The program intends to buy to budget for FY 2024 through FY 2026, while also factoring in the cost of support equipment. FY 2027 AUR unit costs is a current estimate anticipated for the FY 2027 ESSM Blk 2 AUR Award. Current procurement intent for the entire Consortium is at max capacity through FY 2030. (2) FY 2027 Obsolescence funding will be going towards designing out obsolete parts associated with the following: 1.) Side-Looking-Subsystem (SLS) Signal Processor (SP) Circuit Card Assembly (CCA), 2.) Form-Fit-Function (F3R) re-spins of the Dual Band Transceiver (DBT) Frequency Reference Unit (FRU), and 3.)F3R re-spins of the FRU Oscillator, Frequency Generator, and Radio Frequency (RF). LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 5 of 18 P-1 Line #23 Volume 1 - 269 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) MDAP/MAIS Code: (3) Canister procurement includes a mix of MK25s and MK852s. There are four (4) missiles per MK25 Quadpack Canister. Unit prices are based on stepladder pricing. Unit prices in FY 2027 and out are estimates based upon the current contract. (4) Canister procurement includes a mix of MK25s and MK852s. There is one (1) missile per MK852 Mod 0. MK852s are transport containers that go to Ship Self Defense System (SSDS) ships to be loaded. MK852 unit cost estimate based on current estimates under negotiation. SSDS ships will be officially modified to take delivery of ESSM Blk 2 AURs in FY 2027. (5) (6) CMBRE requirement (power supply, and cables) ends in FY 2022. Procured CMBREs are used to reprogram ESSM Blk 2 AURs in deployed locations. Costs required for the shared (across multiple missile families) production facility in Tucson, AZ. Previous submissions showed this funding in overall procurement support however the effort is now being broken out to show specific information on what support costs are being used for. Production Support (Producibility/Procurement, Security Infrastructure, Hardware Maintenance, and Configuration Management) for ESSM Blk 2 reflects the U.S. Share under the cooperative Memorandum of Understanding (MOU) with Consortium Partners. The US is responsible for approximately 45% of the missile production support under this approved MOU. While there is not a one-to-one relationship between yearly missile quantities and the amount of production support necessary for Blk2, an increase in missile quantity will generally drive increase in production support. (7) Costs required for the shared (across multiple missile families) production facility in Tucson, AZ. Previous submissions showed this funding in overall procurement support however the effort is now being broken out to show specific information on what support costs are being used for. Production Support (Producibility/Procurement, Security Infrastructure, Hardware Maintenance, and Configuration Management) for ESSM Blk 2 reflects the U.S. Share under the cooperative Memorandum of Understanding (MOU) with Consortium Partners. The US is responsible for approximately 45% of the missile production support under this approved MOU. While there is not a one-to-one relationship between yearly missile quantities and the amount of production support necessary for Blk2, an increase in missile quantity will generally drive increase in production support. (8) Support for the system performance per the Navy weapon specifications. Production Support (Producibility/Procurement, Security Infrastructure, Hardware Maintenance, and Configuration Management) for ESSM Blk 2 reflects the U.S. Share under the cooperative Memorandum of Understanding (MOU) with Consortium Partners. The US is responsible for approximately 45% of the missile production support under this approved MOU. While there is not a one-to-one relationship between yearly missile quantities and the amount of production support necessary for Blk2, an increase in missile quantity will generally drive increase in production support. (9) Support for test equipment in the production line. Production Support (Producibility/Procurement, Security Infrastructure, Hardware Maintenance, and Configuration Management) for ESSM Blk 2 reflects the U.S. Share under the cooperative Memorandum of Understanding (MOU) with Consortium Partners. The US is responsible for approximately 45% of the missile production support under this approved MOU. While there is not a one-to-one relationship between yearly missile quantities and the amount of production support necessary for Blk2, an increase in missile quantity will generally drive increase in production support. LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 6 of 18 P-1 Line #23 Volume 1 - 270 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements O O C P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 1.1.1) MK 41 AEGIS ALL UP ROUND MISSILE HARDWARE 2016 Raytheon CO (10) / Tucson, AZ SS / FFP NAVSEA Mar 2016 Mar 2018 12 1,038K Y Oct 2014 1.1.1) MK 41 AEGIS ALL UP ROUND MISSILE HARDWARE 2017 Raytheon CO (10) / Tucson, AZ SS / FFP NAVSEA May 2017 May 2019 49 1,201K Y Oct 2015 1.1.2) MK 29 ALL UP ROUNDS MISSILE HARDWARE 2016 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Mar 2016 Mar 2018 18 971,944.44 Y 1.1.3) MK 57 ALLUP ROUNDS MISSILE HARDWARE 2017 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Oct 2016 Oct 2018 24 1,277K Y Raytheon CO (11) / Tucson, AZ SS / FFP NAVSEA Jul 2019 Jul 2021 31 1,748K Y Oct 2017 (Each) Mar 2000 Jun 2014 1.1.5) ESSM BLOCK 2 (†) 1.1.5) ESSM BLOCK 2 (†) 2019 Raytheon CO (11) / Tucson, AZ SS / FFP NAVSEA Jul 2019 Jul 2021 45 1,728K Y Oct 2018 1.1.5) ESSM BLOCK 2 (†) 2020 Raytheon CO (11) / Tucson, AZ SS / FPIF NAVSEA Oct 2019 Oct 2021 50 1,727K Y Oct 2019 1.1.5) ESSM BLOCK 2 (†) 2021 Raytheon CO (11) / Tucson, AZ SS / FPIF NAVSEA Sep 2021 Sep 2023 110 1,577K N Oct 2020 1.1.5) ESSM BLOCK 2 (†) 2022 Raytheon CO (11) / Tucson, AZ SS / FPIF NAVSEA Nov 2021 Nov 2023 108 1,573K N Oct 2021 1.1.5) ESSM BLOCK 2 (†) 2023 Raytheon CO (11) / Tucson, AZ SS / FPIF NAVSEA Oct 2022 Oct 2024 136 1,541K N Oct 2022 1.1.5) ESSM BLOCK 2 (†) 2024 Raytheon CO (11) / Tucson, AZ C / TBD NAVSEA Aug 2024 Aug 2026 168 1,351K N Dec 2023 1.1.5) ESSM BLOCK 2 (†) 2025 Raytheon CO (11) / Tucson, AZ C / TBD NAVSEA Dec 2024 Dec 2026 374 1,351K N Oct 2024 1.1.5) ESSM BLOCK 2 (†) 2026 Raytheon CO (11) / Tucson, AZ C / TBD NAVSEA Dec 2025 Dec 2027 305 1,351K N Oct 2025 1.1.5) ESSM BLOCK 2 (†) 2027 Raytheon CO (11) / Tucson, AZ C / TBD NAVSEA Dec 2026 Dec 2028 290 1,520K N Nov 2026 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2018 2016 BAE / ABERDEEN, SD SS / FFP NAVSEA Mar 2016 Jun 2017 3 419,200.00 Y Feb 2014 2017 BAE / ABERDEEN, SD SS / FFP NAVSEA May 2017 Aug 2018 19 374,064.00 Y Feb 2015 2018 BAE / ABERDEEN, SD C / FFP NAVSEA Jul 2019 Oct 2020 11 480,000.00 Y Feb 2016 2019 BAE / ABERDEEN, SD C / FFP NAVSEA Jul 2019 Oct 2020 11 489,600.00 Y 2020 BAE / ABERDEEN, SD C / FFP NAVSEA Feb 2020 May 2021 8 608,798.00 Y 2021 BAE / ABERDEEN, SD C / FFP NAVSEA Mar 2021 Jun 2022 20 596,386.00 Y 2022 BAE / ABERDEEN, SD C / FFP NAVSEA Mar 2022 Jun 2023 17 616,083.00 Y LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 7 of 18 P-1 Line #23 Volume 1 - 271 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) FY Contractor and Location Method/Type or Funding Vehicle 2023 BAE / ABERDEEN, SD C / FFP NAVSEA Mar 2023 Jun 2024 34 634,525.00 Y 2024 TBD / TBD C / TBD NAVSEA Nov 2023 Feb 2025 38 691,844.00 Y 2025 TBD / TBD C / TBD NAVSEA Mar 2025 Jun 2026 94 655,645.00 Y 2026 TBD / TBD C / TBD NAVSEA Mar 2026 Jun 2027 71 675,618.00 Y (†) 2027 TBD / TBD C / TBD NAVSEA Mar 2027 Jun 2028 72 696,202.00 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2018 Raytheon CO / Tucson AZ SS / FFP NAVSEA Aug 2019 Aug 2019 7 56,000.00 Y Oct 2017 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2019 Raytheon CO / Tucson AZ SS / FFP NAVSEA Aug 2019 Aug 2019 5 57,680.00 Y Oct 2018 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2021 Raytheon CO / Tucson AZ C / TBD NAVSEA Oct 2020 Oct 2020 30 41,712.00 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2022 Raytheon CO / Tucson AZ C / TBD NAVSEA Oct 2021 Oct 2021 31 25,007.00 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2024 Raytheon CO / Tucson AZ C / TBD NAVSEA Feb 2024 Feb 2024 17 48,678.59 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2025 Raytheon CO / Tucson AZ C / TBD NAVSEA Oct 2024 Oct 2024 29 48,678.59 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2026 Raytheon CO / Tucson AZ C / TBD ** NO PCO ** Oct 2025 Oct 2025 28 48,678.59 Y 2.1.3) MK 852 Mod 0 (Blk2 Shipping) 2027 Raytheon CO / Tucson AZ C / TBD ** NO PCO ** Oct 2026 Oct 2026 2 40,068.00 Y 2021 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Nov 2020 Nov 2020 20 154,151.00 Y 2021 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Nov 2020 Nov 2020 20 91,800.00 Y 2021 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Nov 2020 Nov 2020 3 61,951.00 Y 2021 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Oct 2020 Oct 2020 10 18,360.00 Y 2022 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Oct 2021 Oct 2021 10 27,000.00 Y 2021 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Oct 2020 Oct 2020 10 5,100.00 Y Cost Elements 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS (†) 2.1.1) MK 25 QUADPACK CANISTERS 3.1.1) CMBRE Procurement 3.1.2) CMBRE Adaptors 3.1.3) CMBRE SPARES 3.1.4) CMBRE Power Supply 3.1.4) CMBRE Power Supply 3.1.5) CMBRE Cables O O C P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 18 P-1 Line #23 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 272 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements 3.1.5) CMBRE Cables 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers (†) 3.1.10) ESSM SHIPPING CONTAINERS (†) O O C P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2022 Northrop Grumman / Huntsville, Alabama C / TBD NAVAIR Oct 2021 Oct 2021 10 5,202.00 Y 2018 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Sep 2018 Sep 2019 10 56,000.00 Y 2016 Raytheon CO / Tucson, AZ SS / FFP NAVSEA Dec 2016 Feb 2019 18 6,166.67 Y (Each) RFP Issue Date Oct 2015 indicates the presence of a P-21 Footnotes: (10) (11) ESSM is a cooperative effort among twelve NATO SEASPARROW nations which contributes to MSR. FRP Test Equipment on contract awarded in FY 2022 and will support max capacity starting in FY 2025. MSR Total Quantity includes Consortium. MSR, 1-8-5, and MAX quantities updated for FY 2022 based on experience from initial production and transition to production progress. LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 9 of 18 P-1 Line #23 Volume 1 - 273 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 0 31 31 1 2019 NAVY 45 0 45 45 1 2020 NAVY 50 0 50 50 1 2021 NAVY 110 0 110 110 1 2022 NAVY 108 0 108 108 1 2023 NAVY 136 0 136 136 1 2024 NAVY 168 0 168 168 1 2025 NAVY 374 0 374 374 1 2026 NAVY 305 0 305 305 1 2027 NAVY 290 0 290 290 2.1.1) MK 25 QUADPACK CANISTERS (3) Prior Years Deliveries: 145 2 2016 NAVY 3 0 3 2 2017 NAVY 19 0 19 2 2018 NAVY 11 0 11 11 2 2019 NAVY 11 0 11 11 2 2020 NAVY 8 0 8 8 2 2021 NAVY 20 0 20 20 2 2022 NAVY 17 0 17 17 2 2023 NAVY 34 0 34 34 3 2024 NAVY 38 0 38 38 3 2025 NAVY (12) 0 94 94 3 2026 NAVY 71 0 71 71 3 2027 NAVY 72 0 72 72 94 A - - - - - - - - - - - - - - - 3 A - 0 - - - - 19 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 0 10 10 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 274 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 0 31 A - - - 31 1 2019 NAVY 45 0 45 A - - - 45 1 2020 NAVY 50 0 50 50 1 2021 NAVY 110 0 110 110 1 2022 NAVY 108 0 108 108 1 2023 NAVY 136 0 136 136 1 2024 NAVY 168 0 168 168 1 2025 NAVY 374 0 374 374 1 2026 NAVY 305 0 305 305 1 2027 NAVY 290 0 290 290 2.1.1) MK 25 QUADPACK CANISTERS (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 2 2017 NAVY 19 0 19 2 2018 NAVY 11 0 11 A - - - 11 2 2019 NAVY 11 0 11 A - - - 11 2 2020 NAVY 8 0 8 8 2 2021 NAVY 20 0 20 20 2 2022 NAVY 17 0 17 17 2 2023 NAVY 34 0 34 34 3 2024 NAVY 38 0 38 38 3 2025 NAVY (12) 0 94 94 3 2026 NAVY 71 0 71 71 3 2027 NAVY 72 0 72 72 94 0 - - - - - - - - - - 2 - 2 2 2 2 2 3 2 2 0 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 0 10 A O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G 5 S E P Volume 1 - 275 5 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 0 31 - - - - - - - - - - - - - - - - - - - - - 4 1 2019 NAVY 45 0 45 - - - - - - - - - - - - - - - - - - - - - 3 1 2020 NAVY 50 0 50 A - - - - - - - - - - - - - - - - - - - - - 1 2021 NAVY 110 0 110 1 2022 NAVY 108 0 108 108 1 2023 NAVY 136 0 136 136 1 2024 NAVY 168 0 168 168 1 2025 NAVY 374 0 374 374 1 2026 NAVY 305 0 305 305 1 2027 NAVY 290 0 290 290 0 2.1.1) MK 25 QUADPACK CANISTERS - 3 - 27 3 - 36 - 50 A - 110 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 2 2017 NAVY 19 19 0 2 2018 NAVY 11 0 11 - - - - - - - - - - - - 1 2 2019 NAVY 11 0 11 - - - - - - - - - - - - 1 2 2020 NAVY 8 0 8 A - - - - - - - - 2 2021 NAVY 20 0 20 2 2022 NAVY 17 0 17 17 2 2023 NAVY 34 0 34 34 3 2024 NAVY 38 0 38 38 3 2025 NAVY (12) 0 94 94 3 2026 NAVY 71 0 71 71 3 2027 NAVY 72 0 72 72 94 0 - 1 - 1 - - 3 3 3 1 1 1 1 1 - - - - A - - 0 1 1 1 - 1 1 - - - - - - 0 1 - 6 20 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 5 5 5 O C T 0 N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 276 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 4 27 1 2019 NAVY 45 9 36 4 4 4 4 4 4 4 4 4 1 2020 NAVY 50 0 50 4 4 4 4 4 4 4 4 4 1 2021 NAVY 110 0 110 1 2022 NAVY 108 0 108 1 2023 NAVY 136 0 136 1 2024 NAVY 168 0 168 168 1 2025 NAVY 374 0 374 374 1 2026 NAVY 305 0 305 305 1 2027 NAVY 290 0 290 290 2.1.1) MK 25 QUADPACK CANISTERS - - - 4 - - - - - 23 0 0 4 5 5 - - - - - - - - - - - A - - - - - - - - - - - 0 - - - - - - - - - - - 9 101 - - - - - - - - - - - - 108 A - - - - - - - - - - - - 136 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 0 2 2017 NAVY 19 19 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 11 11 0 2 2020 NAVY 8 2 6 2 2021 NAVY 20 0 20 2 2022 NAVY 17 0 17 2 2023 NAVY 34 0 34 3 2024 NAVY 38 0 38 38 3 2025 NAVY (12) 0 94 94 3 2026 NAVY 71 0 71 71 3 2027 NAVY 72 0 72 72 94 0 2 2 - 1 - 1 - 0 - - - - - A - - - 5 - - 1 - 2 - 3 - - - - - - 3 2 - 3 - - 1 - - - A - - - 0 1 - - - - - 4 - 12 34 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 10 0 0 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 277 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 31 0 0 1 2019 NAVY 45 45 0 0 1 2020 NAVY 50 50 0 1 2021 NAVY 110 9 101 1 2022 NAVY 108 0 108 - 1 2023 NAVY 136 0 136 - 1 2024 NAVY 168 0 168 1 2025 NAVY 374 0 374 1 2026 NAVY 305 0 305 305 1 2027 NAVY 290 0 290 290 2.1.1) MK 25 QUADPACK CANISTERS 0 9 9 9 9 9 9 9 9 9 10 10 9 9 9 9 9 9 9 9 9 9 - - - - - - - - - 0 9 9 0 - - 10 10 10 12 12 10 12 12 12 12 12 12 0 A - - - - - - - - - - - - - - 168 A - - - - - - - - - - 374 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 0 2 2017 NAVY 19 19 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 11 11 0 0 2 2020 NAVY 8 8 0 0 2 2021 NAVY 20 20 0 2 2022 NAVY 17 5 12 2 2023 NAVY 34 0 34 3 2024 NAVY 38 0 38 3 2025 NAVY (12) 0 94 3 2026 NAVY 71 0 71 71 3 2027 NAVY 72 0 72 72 94 0 4 4 - 4 0 - - - - - - - A - - - - - - - 2 2 - 2 - 2 - 2 - 4 - 4 - 4 - - 4 4 2 2 2 2 4 4 A - - 0 4 - 3 - 3 - 3 - - 13 94 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 10 0 0 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 278 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 31 0 0 1 2019 NAVY 45 45 0 0 1 2020 NAVY 50 50 0 0 1 2021 NAVY 110 110 0 0 1 2022 NAVY 108 108 0 0 1 2023 NAVY 136 136 0 1 2024 NAVY 168 0 168 - - - - - - - - - - 12 12 12 12 12 12 15 16 16 16 16 17 1 2025 NAVY 374 0 374 - - - - - - - - - - - - - - 30 30 30 30 30 30 31 31 31 32 69 1 2026 NAVY 305 0 305 A - - - - - - - - - - - - - - - - - - - - - - 305 1 2027 NAVY 290 0 290 A - - - - - - - - - - 290 2.1.1) MK 25 QUADPACK CANISTERS 0 0 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 0 2 2017 NAVY 19 19 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 11 11 0 0 2 2020 NAVY 8 8 0 0 2 2021 NAVY 20 20 0 0 2 2022 NAVY 17 17 0 0 2 2023 NAVY 34 34 0 3 2024 NAVY 38 25 13 3 2025 NAVY (12) 0 94 3 2026 NAVY 71 0 71 3 2027 NAVY 72 0 72 94 0 3 3 - 3 - 4 - 0 - - - - - A - - - 6 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 9 - 9 14 - - - A - - - 0 3 6 - 6 - 6 - - 50 72 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 10 0 0 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 279 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2018 NAVY 31 31 0 0 1 2019 NAVY 45 45 0 0 1 2020 NAVY 50 50 0 0 1 2021 NAVY 110 110 0 0 1 2022 NAVY 108 108 0 0 1 2023 NAVY 136 136 0 0 1 2024 NAVY 168 168 0 1 2025 NAVY 374 305 69 32 37 1 2026 NAVY 305 0 305 - - 20 20 21 21 22 27 28 30 30 30 30 26 1 2027 NAVY 290 0 290 - - - - - - - - - - - - - - 2.1.1) MK 25 QUADPACK CANISTERS 0 0 0 23 23 23 23 23 23 24 25 25 25 53 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 0 2 2017 NAVY 19 19 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 11 11 0 0 2 2020 NAVY 8 8 0 0 2 2021 NAVY 20 20 0 0 2 2022 NAVY 17 17 0 0 2 2023 NAVY 34 34 0 0 3 2024 NAVY 38 38 0 0 3 2025 NAVY (12) 94 0 3 2026 NAVY 71 21 50 3 2027 NAVY 72 0 72 94 0 6 6 - 6 - 6 - 6 - 7 - 7 - 6 - 0 - 3 3 6 6 6 6 6 6 6 7 8 9 0 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 10 0 0 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 280 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.5) ESSM BLOCK 2 PROC QTY Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 2018 NAVY 31 31 0 0 1 2019 NAVY 45 45 0 0 1 2020 NAVY 50 50 0 0 1 2021 NAVY 110 110 0 0 1 2022 NAVY 108 108 0 0 1 2023 NAVY 136 136 0 0 1 2024 NAVY 168 168 0 0 1 2025 NAVY 374 374 0 0 1 2026 NAVY 305 305 0 1 2027 NAVY 290 237 53 2.1.1) MK 25 QUADPACK CANISTERS 0 27 26 0 (3) Prior Years Deliveries: 145 2 2016 NAVY 3 3 0 0 2 2017 NAVY 19 19 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 11 11 0 0 2 2020 NAVY 8 8 0 0 2 2021 NAVY 20 20 0 0 2 2022 NAVY 17 17 0 0 2 2023 NAVY 34 34 0 0 3 2024 NAVY 38 38 0 0 3 2025 NAVY (12) 94 0 0 3 2026 NAVY 71 71 0 0 3 2027 NAVY 72 72 0 0 94 3.1.6) MK 852 Mod 0 (BLK 2) Shipping Containers 4 2018 NAVY 10 10 0 0 O C T N O V LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 281 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2307 / Evolved Sea Sparrow Missile (ESSM) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Production Rates (Each / Year) Item Number / Title [DODIC]: 1 / Evolved Sea Sparrow Missile (ESSM) Procurement Leadtime (Months) Initial MFR Ref # Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Raytheon CO (11) - Tucson, 144 144 540 8 2 24 26 2 2 24 26 2 BAE - ABERDEEN, SD 45 48 100 0 5 15 20 5 5 15 20 3 TBD - TBD 45 48 100 0 5 15 20 5 5 15 20 0 0 0 0 0 0 0 0 AZ 4 Raytheon CO - Tucson AZ TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (11) FRP Test Equipment on contract awarded in FY 2022 and will support max capacity starting in FY 2025. MSR Total Quantity includes Consortium. MSR, 1-8-5, and MAX quantities updated for FY 2022 based on experience from initial production and transition to production progress. (12) Per the pricing schedule: the max procurable with stepladder pricing is QTY 100. LI 2307 - Evolved Sea Sparrow Missile (ESSM) Navy UNCLASSIFIED Page 18 of 18 P-1 Line #23 Volume 1 - 282 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2327 / AARGM-ER Program Elements for Code B Items: N/A Other Related Program Elements: 0205601N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 179 157 99 - - - 40 39 42 50 1,729 2,335 1,982.202 226.486 227.817 24.304 0.000 24.304 144.356 125.216 132.270 170.277 4,471.127 7,504.055 33.273 34.604 24.284 - 24.284 5.210 5.249 5.405 16.742 354.678 479.445 193.213 193.213 0.020 0.000 0.020 139.146 119.967 126.865 153.535 4,116.449 7,024.610 1,982.202 To FY 2031 Complete Total 33.273 34.604 24.284 5.210 - 5.210 5.249 5.405 8.286 8.456 354.678 479.445 2,015.475 227.817 217.497 5.230 0.000 5.230 144.395 125.372 135.151 161.991 4,471.127 7,504.055 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 5.124 - 5.124 4.303 3.638 4.183 Flyaway Unit Cost ($ in Thousands) 8,746.464 - 0.000 - 1,936.949 4.688 - - - 2,962.500 2,948.897 2,851.738 2,928.300 8.111 Continuing 2,310.366 Continuing 2,687.785 Gross/Weapon System Unit Cost ($ in Thousands) 11,073.754 1,442.586 2,301.182 - - - 3,608.900 3,210.667 3,149.286 3,405.540 2,585.961 3,213.728 Description: AGM-88G Advanced Anti-Radiation Guided Missile Extended Range (AARGM-ER) is an ACAT-1B program. The AARGM-ER program will integrate hardware and software upgrades to the AARGM missile guidance and control sections, a new rocket motor, and a Control Actuation System (CAS) into a new outer mold line able to be launched from FA-18 E/F, EA-18G and is compatible with F-35 internal bay platforms. AARGM-ER's capabilities will provide improved AARGM operational capabilities adding extended range, increased survivability and effectiveness against complex, new, and emerging threats. AGM-88G AARGM-ER production units will prosecute Integrated Air Defense Systems (IADS) supporting Suppression of Enemy Air Defensed (SEAD) missions. AARGM-ER is a cooperative program between the Department of War of the United States of America and the Ministry of Defense of the Republic of Italy. AGM-88E Advanced Anti-Radiation Guided Missile (AARGM) is an ACAT-1C acquisition program to upgrade the Legacy AGM-88 High Speed Anti-Radiation Missile (HARM) with multi-mode guidance and enhanced targeting capability. The AARGM program integrates multi-mode guidance (passive Anti-Radiation Homing (ARH)/active Millimeter Wave (MMW) Radar/Global Positioning system (GPS)/Inertial Navigation System) on the HARM AGM-88 missile. The AARGM weapon system capabilities include: active MMW terminal guidance, counter shutdown, expanded threat coverage, enhanced ARH receiver, Weapon Impact Assessment (WIA) transmission prior to detonation, GPS point-to-point weapon navigation, and weapon employment with impact avoidance zone/missile impact zones. AGM-88E AARGM production units possess the capability to engage targets in the Destruction of Enemy Air Defenses (DEAD) mission area. AARGM is a cooperative program between the Department of War of the United States of America and the Ministry of Defense of the Republic of Italy. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 1 of 23 P-1 Line #24 Volume 1 - 283 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2327 / AARGM-ER Program Elements for Code B Items: N/A Other Related Program Elements: 0205601N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total MDAP/ MAIS Code Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / AARGM-ER P-5a, P-21 607 172 / 512.556 P-5 2 / AARGM P-5a, P-21 368 - P-40 Total Gross/Weapon System Cost - / 1,469.646 179 / 1,982.202 / 226.486 - / 0.000 157 / 226.486 88 / 227.817 - / 24.304 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 99 / 227.817 - / 24.304 - / 0.000 - / 24.304 - / 24.304 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 The AARGM-ER program will initiate a strategic pause. FY27 contract award expected for international only. FY 2025 Congressional Recission FY 2023 through FY 2026 unit cost assumes USAF concurrent procurement of AGM-88G AARGM-ER AURs, which is reflected in USAF PE 0207328F. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 2 of 23 P-1 Line #24 Volume 1 - 284 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / AARGM-ER MDAP/MAIS Code: 607 Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 172 Gross/Weapon System Cost ($ in Millions) 512.556 Less PY Advance Procurement ($ in Millions) FY 2027 Base FY 2027 OOC - - - 227.817 24.304 0.000 24.304 - 88 226.486 - FY 2027 Total 33.273 34.604 24.284 - 24.284 Net Procurement (P-1) ($ in Millions) 512.556 193.213 193.213 0.020 0.000 0.020 Plus CY Advance Procurement ($ in Millions) 33.273 34.604 24.284 5.210 - 5.210 Total Obligation Authority ($ in Millions) 545.829 227.817 217.497 5.230 0.000 5.230 - - - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 2,979.977 - - 2,588.830 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) ES010 AGM-88G All Up 2,616.104 154 402.880 - - 0.000 1,727.000 82 141.614 - - 0.000 - - 0.000 - - 0.000 1,777.500 18 31.995 - - 0.000 910.000 6 5.460 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 44.684 - - 0.000 - - 0.000 - - 0.000 (4) - - 0.000 - - 0.000 - - 0.000 - - 24.284 - - 0.000 - - 24.284 Subtotal: Recurring Cost - - 434.875 - - 0.000 - - 191.758 - - 24.284 - - 0.000 - - 24.284 - - 434.875 - - 0.000 - - 191.758 - - 24.284 - - 0.000 - - 24.284 47.779 172 8.218 - - 0.000 34.018 88 2.994 - - 0.000 - - 0.000 - - 0.000 710.063 16 11.361 - - 0.000 521.723 8 4.174 - - 0.000 - - 0.000 - - 0.000 - - 3.996 - - 0.000 - - 0.978 - - 0.000 - - 0.000 - - 0.000 - - 12.903 - - 11.119 - - 6.611 - - 0.000 - - 0.000 - - 0.000 (†) (1) Round (AURs) 1.1.2) ES990 Captive Air Training Missiles (†) (2) (CATMs) 1.1.3) AGM-88G All Up Round (AURs) Classified (3) 1.1.4) Advanced Procurement Credit Subtotal: Flyaway Cost Support Cost 2.1) ES960 Containers (5) 2.2) ES995 Telemetry Sections (6) 2.3) ES940 Support Equipment (7) 2.4) ES700 Engineering Change Orders (8) LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 3 of 23 P-1 Line #24 Volume 1 - 285 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / AARGM-ER MDAP/MAIS Code: 607 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) 2.5) ES930 Production FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 14.123 - - 12.329 - - 7.114 - - 0.010 - - 0.000 - - 0.010 - - 4.291 - - 4.010 - - 2.471 - - 0.010 - - 0.000 - - 0.010 2.7) ES050 ST/STE for Production Facilitization - - 9.951 - - 0.000 - - 2.031 - - 0.000 - - 0.000 - - 0.000 2.8) ES060 Diminishing Manufacturing Sources - - 2.838 - - 0.087 - - 9.686 - - 0.000 - - 0.000 - - 0.000 - - 10.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 198.941 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 77.681 - - 226.486 - - 36.059 - - 0.020 - - 0.000 - - 0.020 172 512.556 - - 226.486 88 227.817 - - 24.304 - - 0.000 - - 24.304 Engineering Support (9) 2.6) ES970 Integrated Logistics Support (10) (11) (DMS) (12) 2.9) RAA 25-001.1 MACE (13) 2.10) Congressional Recission (14) - Subtotal: Support Cost Gross/Weapon System Cost (†) 2,979.977 2,588.830 indicates the presence of a P-5a Footnotes: (1) Cost Element 1.1.1 AGM-88G AARGM-ER AUR unit cost assumes USAF concurrent procurement of AGM-88G AARGM-ER AURs and efficiencies gained with Advanced Procurement of long lead materials. FY 2026 QTY updated to account for DMSMS Life of Type Buy. FY 2027 decreased due to program taking a strategic pause. Unit cost based on projected total quantities across all services to include USAF and International, resulting in a fluctuation in unit cost from year to year. (2) Cost Element 1.1.2 AGM-88G Captive Air Training Missiles (CATMs) unit cost correlates with AGM-88G AARGM-ER All Up Round unit cost due to combined pricing of common hardware that changes due to procurement quantity changes. FY 2027 decreased due to program taking a strategic pause. CATM quantity will remain 91 by moving quantities to the "To Complete". (3) (4) (5) (6) (7) (8) (9) Details held at a higher classification FY 2027 Advanced Procurement Credit Cost Element 2.1 Containers are required one per AUR and one per CATM. FY 2027 decreased due to program taking a strategic pause. Cost Element 2.2 Telemetry Sections - FY 2027 decreased due to program taking a strategic pause. Cost Element 2.3 Support Equipment - FY 2027 decreased due to program taking a strategic pause. Cost Element 2.4 Engineering Change Orders (ECO) - FY 2027 decreased due to program taking a strategic pause. Cost Element 2.5 Production Engineering Support (PES) - FY 2027 decreased due to program taking a strategic pause. (10) Cost Element 2.6 Integrated Logistics Support (ILS) - The ILS cost element can include the costs of maintenance, supply support, support equipment management, computer resources support, training and training support, ILS program management, Packaging, Handling, Storage and Transportation (PHS&T), and DATMs. FY 2027 decreased due to program taking a strategic pause. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 4 of 23 P-1 Line #24 Volume 1 - 286 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2327 / AARGM-ER ID Code (A=Service Ready, B=Not Service Ready) : (11) (12) Item Number / Title [DODIC]: 1 / AARGM-ER MDAP/MAIS Code: 607 Cost Element 2.7 Special Tooling/Special Test Equipment (ST/STE) funding addresses production facilitization. ST/STE - FY 2027 decreased due to program taking a strategic pause. Cost Element 2.8 Diminishing Manufacturing Sources funding includes Life of Type Buys (LOTB) parts and components, circuit boards and electronics update, and various other parts required for production of AARGM-ER AURs and CATMs until the qualification of replacement parts. FY 2026 increase to support a Life of Type Buy. FY 2027 decreased due to program taking a strategic pause. (13) (14) FY 2024 RAA 25.001.0 MACE FY 2025 Congressional Recission for higher priorities LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 5 of 23 P-1 Line #24 Volume 1 - 287 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements 1.1.1) ES010 AGM-88G All Up Round (AURs) (†) 1.1.1) ES010 AGM-88G All Up Round (AURs) (†) 1.1.1) ES010 AGM-88G All Up Round (AURs) (†) 1.1.1) ES010 AGM-88G All Up Round (AURs) (†) 1.1.2) ES990 Captive Air Training Missiles (CATMs) (†) 1.1.2) ES990 Captive Air Training Missiles (CATMs) (†) 1.1.2) ES990 Captive Air Training Missiles (CATMs) (†) 1.1.2) ES990 Captive Air Training Missiles (CATMs) (†) O O C P-1 Line Item Number / Title: 2327 / AARGM-ER Method/Type or Funding Vehicle Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2021 Northrup Grumman Corporation Defense Systems (FY21 and FY22) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2021 Jun 2026 16 1,931.625 Y Nov 2020 2022 Northrup Grumman Corporation Defense Systems (FY21 and FY22) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Dec 2021 Nov 2026 54 1,573.778 Y Nov 2020 2023 Northrup Grumman Corporation Defense Systems (FY23) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Nov 2023 Nov 2027 84 1,799.400 Y Apr 2022 Northrup Grumman Corporation Defense Systems (with AP & AF) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Jun 2026 Nov 2028 82 1,727.000 Y Sep 2024 2021 Northrup Grumman Corporation Defense Systems (FY21 and FY22) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2021 May 2026 6 1,554.667 Y Nov 2020 2022 Northrup Grumman Corporation Defense Systems (FY21 and FY22) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Dec 2021 Nov 2026 6 1,454.667 Y Nov 2020 2023 Northrup Grumman Corporation Defense Systems (FY23) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Nov 2023 Nov 2027 6 1,220.231 Y Apr 2022 2026 Northrup Grumman Corporation Defense Systems (with AP) / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Jun 2026 Nov 2028 6 910.000 Y Sep 2025 2024 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2024 Nov 2027 151 132.033 Y Jan 2024 2026 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2026 Nov 2029 194 68.392 Y Jan 2026 2027 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2027 Nov 2030 40 88.450 Y Jan 2027 2028 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2028 Nov 2031 39 92.077 Y Jan 2028 2029 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2029 Nov 2032 42 85.048 Y Jan 2029 2030 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MDNAVAIR, Patuxent River, Sep 2030 Nov 2033 50 102.960 Y Jan 2030 2031 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2031 Nov 2034 48 106.000 Y Jan 2031 2026 (15) Location of PCO Item Number / Title [DODIC]: 1 / AARGM-ER (Each) Advance Procurement All Up Round - Specialty Materials All Up Round - Specialty Materials All Up Round - Specialty Materials All Up Round - Specialty Materials All Up Round - Specialty Materials All Up Round - Specialty Materials All Up Round - Specialty Materials LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 6 of 23 P-1 Line #24 Volume 1 - 288 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements Method/Type or Funding Vehicle Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date Contractor and Location 2024 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2024 Feb 2027 151 5.748 Y Jan 2024 2026 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2026 Feb 2029 194 4.170 Y Feb 2025 2027 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2027 Feb 2030 40 2.725 Y Jan 2027 2028 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2028 Feb 2031 39 2.692 Y Jan 2028 2029 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2029 Feb 2032 42 2.571 Y Jan 2029 2030 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2030 Feb 2033 50 2.220 Y Jan 2030 2031 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2031 Feb 2034 48 3.667 Y Jan 2031 All Up Round - CCA subcomponents 2024 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2024 Jun 2027 151 76.265 Y Jan 2024 All Up Round - CCA subcomponents 2026 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2026 Jun 2029 194 49.149 Y Feb 2025 All Up Round - CCA subcomponents 2027 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2027 Jun 2030 40 39.075 Y Jan 2027 All Up Round - CCA subcomponents 2028 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2028 Jun 2031 39 39.821 Y Jan 2028 All Up Round - CCA subcomponents 2029 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2029 Jun 2032 42 41.071 Y Jan 2029 2030 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MDNAVAIR, Patuxent River, Sep 2030 Jun 2033 50 60.540 Y Jan 2030 All Up Round - CCA subcomponents 2031 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2031 Jun 2034 48 66.500 Y Jan 2031 Captive Air Training Missile Specialty Materials 2024 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2024 Nov 2027 6 87.667 Y Jan 2024 Captive Air Training Missile Specialty Materials 2026 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Sep 2026 Nov 2029 6 59.511 Y Dec 2025 Captive Air Training Missile - CCA subcomponents 2024 Northrup Grumman Corporation Defense Systems / Northridge, CA C / TBD NAVAIR, Patuxent River, MD Sep 2024 Nov 2027 6 71.000 Y Jan 2024 Captive Air Training Missile - CCA subcomponents 2026 Northrup Grumman Corporation Defense Systems / Northridge, CA C / TBD NAVAIR, Patuxent River, MD Sep 2026 Nov 2029 6 52.566 Y Jan 2026 All Up Round - Warhead All Up Round - Warhead All Up Round - Warhead All Up Round - Warhead All Up Round - Warhead All Up Round - Warhead All Up Round - CCA subcomponents Location of PCO Item Number / Title [DODIC]: 1 / AARGM-ER FY All Up Round - Warhead (†) O O C P-1 Line Item Number / Title: 2327 / AARGM-ER (Each) indicates the presence of a P-21 LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 7 of 23 P-1 Line #24 Volume 1 - 289 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2327 / AARGM-ER Item Number / Title [DODIC]: 1 / AARGM-ER Footnotes: (15) USAF quantities were procured without AP with a date of first delivery of Feb 2029. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 8 of 23 P-1 Line #24 Volume 1 - 290 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AARGM-ER Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT 1.1.1) ES010 AGM-88G All Up Round (AURs) Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 16 (16) 0 16 54 (17) 0 54 NAVY 84 0 84 (‡) 34 0 34 34 2023 Total 118 0 118 118 3 2026 NAVY (18) 0 82 82 3 2026 (‡) 99 0 99 99 15 0 15 15 196 0 196 196 1 2021 NAVY 1 2022 NAVY 2 2023 2 2023 AF 2 AF 3 2026 FMS 3 2026 Total 82 (‡) 1.1.2) ES990 Captive Air Training Missiles (CATMs) A - - - - - - - - - - - - 16 A - - - - - - - - - - 54 84 (2) 4 2021 NAVY 6 (19) 0 6 4 2022 NAVY 6 (20) 0 6 5 2023 NAVY 6 0 6 6 2026 NAVY 6 0 6 A - - - - - - - - - - - - - 6 A - - - - - - - - - - 6 6 6 O C T LI 2327 - AARGM-ER Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 291 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AARGM-ER Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) ES010 AGM-88G All Up Round (AURs) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 16 (16) 0 16 - - - - - - - - - - - - - - - - - - - - - - - - 16 54 (17) 0 54 - - - - - - - - - - - - - - - - - - - - - - - - 54 NAVY 84 0 84 A - - - - - - - - - - - 84 (‡) 34 0 34 A - - - - - - - - - - - 34 2023 Total 118 0 118 - - - - - - - - - - - 118 3 2026 NAVY (18) 0 82 82 3 2026 (‡) 99 0 99 99 15 0 15 15 196 0 196 196 1 2021 NAVY 1 2022 NAVY 2 2023 2 2023 AF 2 AF 3 2026 FMS 3 2026 Total 82 (‡) 1.1.2) ES990 Captive Air Training Missiles (CATMs) (2) 4 2021 NAVY 6 (19) 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 4 2022 NAVY 6 (20) 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 5 2023 NAVY 6 0 6 A - - - - - - - - - - - 6 6 2026 NAVY 6 0 6 6 O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 292 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AARGM-ER Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) ES010 AGM-88G All Up Round (AURs) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 16 (16) 0 16 - - - - - - - - - - - - - - - - - - - - 54 (17) 0 54 - - - - - - - - - - - - - - - - - - - - - - - - 54 NAVY 84 0 84 - - - - - - - - - - - - - - - - - - - - - - - - 84 (‡) 34 0 34 - - - - - - - - - - - - - - - - - - - - - - - - 34 2023 Total 118 0 118 - - - - - - - - - - - - - - - - - - - - - - - - 118 3 2026 NAVY (18) 0 82 A - - - - 82 3 2026 (‡) 99 0 99 A - - - - 99 15 0 15 A - - - - 15 196 0 196 - - - - 196 1 2021 NAVY 1 2022 NAVY 2 2023 2 2023 AF 2 AF 3 2026 FMS 3 2026 Total 82 (‡) 1.1.2) ES990 Captive Air Training Missiles (CATMs) 2 8 6 0 (2) 4 2021 NAVY 6 (19) 0 6 - - - - - - - - - - - - - - - - - - - 4 2022 NAVY 6 (20) 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 5 2023 NAVY 6 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 6 2026 NAVY 6 0 6 A - - - - 6 O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R 1 M A Y 1 J U N 2 J U L 2 A U G 0 S E P Volume 1 - 293 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AARGM-ER Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) ES010 AGM-88G All Up Round (AURs) Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 16 (16) 16 0 54 (17) 0 54 - NAVY 84 0 84 - - - - - - - - - - - - - 2 2 2 2 11 10 10 (‡) 34 0 34 - - - - - - - - - - - - - 8 8 9 9 - - - 2023 Total 118 0 118 - - - - - - - - - - - - - 10 10 11 11 11 10 10 3 2026 NAVY (18) 0 82 - - - - - - - - - - - - - - - - - - - - - - - - 82 3 2026 AF 99 0 99 - - - - - - - - - - - - - - - - - - - - - - - - 99 15 0 15 - - - - - - - - - - - - - - - - - - - - - - - - 15 196 0 196 - - - - - - - - - - - - - - - - - - - - - - - - 196 1 2021 NAVY 1 2022 NAVY 2 2023 2 2023 AF 2 82 (‡) 3 2026 FMS 3 2026 Total (‡) 1.1.2) ES990 Captive Air Training Missiles (CATMs) 0 1 2 4 4 5 6 6 6 5 5 5 5 9 - 9 9 9 9 9 9 0 9 9 (2) 4 2021 NAVY 6 (19) 6 0 4 2022 NAVY 6 (20) 0 6 - 5 2023 NAVY 6 0 6 - - - - - - - - - - - - - 6 2026 NAVY 6 0 6 - - - - - - - - - - - - - 0 O C T LI 2327 - AARGM-ER Navy 0 9 1 N O V - D E C 1 J A N - F E B 1 M A R - A P R 1 M A Y - J U N 1 J U L - A U G UNCLASSIFIED Page 12 of 23 1 S E P 0 O C T 1 - N O V 1 D E C - J A N 1 F E B P-1 Line #24 - M A R 1 A P R - M A Y 1 J U N - J U L 1 A U G S E P Volume 1 - 294 0 6 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / AARGM-ER Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) ES010 AGM-88G All Up Round (AURs) Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 16 (16) 16 0 54 (17) 54 0 NAVY 84 75 9 (‡) 34 34 0 2023 Total 118 109 9 3 2026 NAVY (18) 0 82 - 7 7 7 7 7 7 7 7 7 7 6 6 0 3 2026 (‡) 99 0 99 - 9 9 9 8 8 8 8 8 8 8 8 8 0 15 0 15 - 1 1 1 1 1 1 1 2 2 2 1 1 196 0 196 - 17 17 17 16 16 16 16 17 17 17 15 15 1 2021 NAVY 1 2022 NAVY 2 2023 2 2023 AF 2 AF 3 2026 FMS 3 2026 Total 82 (‡) 1.1.2) ES990 Captive Air Training Missiles (CATMs) 0 0 9 0 - 0 9 - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - 0 (2) 4 2021 NAVY 6 (19) 6 0 0 4 2022 NAVY 6 (20) 6 0 0 5 2023 NAVY 6 6 0 6 2026 NAVY 6 0 6 0 O C T LI 2327 - AARGM-ER Navy 1 N O V D E C 1 J A N F E B 1 M A R A P R 1 M A Y J U N 1 J U L A U G UNCLASSIFIED Page 13 of 23 1 S E P 0 O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 295 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Item Number / Title [DODIC]: 1 / AARGM-ER Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Northrup Grumman Corporation Defense Systems (FY21 and FY22) Northridge, CA 60 85 168 0 3 24 27 0 3 24 27 2 Northrup Grumman Corporation Defense Systems (FY23) - Northridge, CA 60 168 228 0 2 26 28 0 3 36 39 3 Northrup Grumman Corporation Defense Systems (with AP & AF) Northridge, CA 60 300 316 0 22 29 51 0 22 29 51 4 Northrup Grumman Corporation Defense Systems (FY21 and FY22) Northridge, CA 60 85 168 0 3 24 27 0 3 24 27 5 Northrup Grumman Corporation Defense Systems (FY23) - Northridge, CA 60 168 228 0 2 26 28 0 3 38 41 6 Northrup Grumman Corporation Defense Systems (with AP) Northridge, CA 60 300 316 0 5 29 34 0 5 29 34 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (16) FY2021 and FY2022 deliveries delayed due to material delays and finalization of configuration due to concurrency with Engineering Manufacturing Development (EMD) efforts. Deliveries have slid to 2026. This is a PM estimate and will be updated to reflect actuals. (17) FY2021 and FY2022 deliveries delayed due to material delays and finalization of configuration due to concurrency with Engineering Manufacturing Development (EMD) efforts. Deliveries have slid to 2026-2027. This is a PM estimate and will be updated to reflect actuals. (18) (19) International includes both FMS and Italian Cooperative quantities. USAF quantities are procured without AP. FY2021 and FY2022 deliveries delayed due to material delays and finalization of configuration due to concurrency with Engineering Manufacturing Development (EMD) efforts. Deliveries have slid to 2026. This is a PM estimate and will be updated to reflect actuals. (20) FY2021 and FY2022 deliveries delayed due to material delays and finalization of configuration due to concurrency with Engineering Manufacturing Development (EMD) efforts. Deliveries have slid to 2026-2027. This is a PM estimate and will be updated to reflect actuals. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 14 of 23 P-1 Line #24 Volume 1 - 296 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / AARGM MDAP/MAIS Code: 368 Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 1,469.646 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,469.646 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 1,469.646 FY 2027 Total 0.000 - - - - 0.000 0.000 0.000 0.000 0.000 0.000 - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) ES010 AUR 625.987 1,655 1,036.009 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) ES990 Training Equipment (CATMS) 706.066 121 85.434 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.3) ES960 Containers 10.460 889 9.299 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,130.742 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,130.742 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 51 22.149 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) Installation Kits Subtotal: Recurring Cost Subtotal: Flyaway Cost Support - Support Cost 2.1) Telemetry Sections 434.294 2.2) ES970 Support Equipment - - 8.901 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) ES700 Engineering Change Orders - - 52.494 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.4) ES930 Production Engineering Support - - 80.757 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.5) Non-Recurring Engineering - - 4.111 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.6) ES970 Integrated Logistics Support - - 26.318 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.7) ES950 Other Production Support - - 87.554 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 15 of 23 P-1 Line #24 Volume 1 - 297 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / AARGM MDAP/MAIS Code: 368 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 2.8) ES400 ST/STE for Production Facilitazation - - 44.655 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.9) ES260 Diminishing Manufacturing Sources (DMS) - - 11.965 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Support Cost - - 338.904 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 1,469.646 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) indicates the presence of a P-5a LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 16 of 23 P-1 Line #24 Volume 1 - 298 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements 1.1.1) ES010 AUR Installation Kits (†) 1.1.1) ES010 AUR Installation Kits (†) (†) O O C P-1 Line Item Number / Title: 2327 / AARGM-ER Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 2 / AARGM Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2020 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Mar 2020 Aug 2026 246 579.858 Y 2021 Northrup Grumman Corporation Defense Systems / Northridge, CA C / FFP NAVAIR, Patuxent River, MD Aug 2021 Nov 2026 87 591.046 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 17 of 23 P-1 Line #24 Volume 1 - 299 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / AARGM Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) ES010 AUR Installation Kits Prior Years Deliveries: 1322 1 2020 NAVY 1 2021 NAVY 246 (21) 0 246 87 (22) 0 87 A - O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R - A P R - M A Y - J U N - J U L - A U G UNCLASSIFIED Page 18 of 23 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #24 - M A R - A P R - M A Y - J U N - J U L - - 246 A - - 87 A U G S E P Volume 1 - 300 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / AARGM Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) ES010 AUR Installation Kits Prior Years Deliveries: 1322 1 2020 NAVY 1 2021 NAVY 246 (21) 0 246 - - - - - - - - - - - - - - - - - - - - - - - - 246 87 (22) 0 87 - - - - - - - - - - - - - - - - - - - - - - - - 87 O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 301 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / AARGM Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) ES010 AUR Installation Kits Prior Years Deliveries: 1322 1 2020 NAVY 1 2021 NAVY 246 (21) 0 246 - - - - - - - - - - - - - - - - - - - - - - - - 246 87 (22) 0 87 - - - - - - - - - - - - - - - - - - - - - - - - 87 O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 302 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / AARGM Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) ES010 AUR Installation Kits Prior Years Deliveries: 1322 1 2020 NAVY 1 2021 NAVY 246 (21) 0 246 - - - - - - - - - - 86 40 87 (22) 0 87 - - - - - - - - - - - - O C T LI 2327 - AARGM-ER Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 23 S E P 6 6 O C T - 7 N O V 3 7 D E C - 7 J A N 7 F E B P-1 Line #24 M A R 20 20 20 22 23 7 7 7 7 7 A P R M A Y J U N J U L 0 8 A U G 8 S E P Volume 1 - 303 8 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / AARGM Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) ES010 AUR Installation Kits Prior Years Deliveries: 1322 1 2020 NAVY 1 2021 NAVY 246 (21) 246 0 87 (22) 79 8 0 8 O C T LI 2327 - AARGM-ER Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 304 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Item Number / Title [DODIC]: 2 / AARGM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Northrup Grumman Corporation Defense Systems - Northridge, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 100 150 300 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 11 41 Total After Oct 1 ALT Prior to Oct 1 52 ALT After Oct 1 0 Manufacturing PLT 11 Total After Oct 1 22 33 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (21) (22) Delivery schedule has slipped as a result of delays to the incorporation of the AGM-88E2 software configuration change. Delivery schedule has slipped as a result of delays to the incorporation of the AGM-88E2 software configuration change. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 23 of 23 P-1 Line #24 Volume 1 - 305 === page 346 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 306 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles P-1 Line Item Number / Title: 2327 / AARGM-ER Program Elements for Code B Items: N/A Other Related Program Elements: 0205601N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 33.273 34.604 24.284 5.210 - 5.210 5.249 5.405 8.286 8.456 354.678 479.445 Net Procurement (P-1) ($ in Millions) 33.273 34.604 24.284 5.210 - 5.210 5.249 5.405 8.286 8.456 354.678 479.445 Total Obligation Authority ($ in Millions) 33.273 34.604 24.284 5.210 - 5.210 5.249 5.405 8.286 8.456 354.678 479.445 Description: AGM-88G Advanced Anti-Radiation Guided Missile Extended Range (AARGM-ER) is an ACAT-1B program. The AARGM-ER program will integrate hardware and software upgrades to the AARGM missile guidance and control sections, a new rocket motor, and a Control Actuation System (CAS) into a new outer mold line able to be launched from FA-18 E/F, EA-18G and is compatible with F-35 internal bay platforms. AARGM-ER's capabilities will provide improved AARGM operational capabilities adding extended range, increased survivability and effectiveness against complex, new, and emerging threats. AGM-88G AARGM-ER production units will prosecute Integrated Air Defense Systems (IADS) supporting Suppression of Enemy Air Defensed (SEAD) missions. The AARGM-ER's extended range combined with increased survivability and effectiveness against complex, new, and emerging threats in aggregate have driven to the selection of high-end specialty components and materials to achieve performance objectives. The AARGM-ER Advance Procurement (AP) funding will be used to procure long-lead material to reduce to overall lead-time for missile production. The long lead Contractor Furnished Equipment materials and subcomponents may include, but not limited to, specialty materials (e.g., Inconel, Titanium, and D6AC Steel), warhead explosive material, and Circuit Card Assembly subcomponents (e.g., field programmable arrays, processors, resistors, capacitors, and diodes). Long-lead list is subject to change based on lead-time changes and pricing negotiations. To optimize resources the FY 2024 AP will be used to support the FY 2026 procurement lot. FY 2025 AP totaling $34.604M was rescinded. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 1 of 4 P-1 Line #25 Volume 1 - 307 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles P-1 Line Item Number / Title: 2327 / AARGM-ER Program Elements for Code B Items: N/A Other Related Program Elements: 0205601N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / AARGM-ER 172 / 33.273 - / 34.604 88 / 24.284 - / 5.210 - / - - / 5.210 P-40 Total Gross/Weapon System Cost 179 / 33.273 157 / 34.604 99 / 24.284 - / 5.210 - / - - / 5.210 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget requests Advance Procurement (AP) for FY 2028 long lead materials. The AGM-88G AARGM-ER Advance Procurement (AP) funding will be used to procure long lead CFE material for subcomponents of the All-Up Round (AUR) and the Captive Air Training Missile (CATM). Long lead subcomponents can include, but are not limited to, specialty materials (e.g. Inconel, Titanium, and D6AC Steel), warhead explosive material, and Circuit Card Assembly subcomponents (e.g. field programmable arrays, resistors, capacitors, and diodes). AUR and CATM CFE reflect the contractor's funding requirements for procurement of long lead parts and materials necessary to protect the delivery schedule. AURs and CATMs procured with AP/long lead deliver 14 months earlier than missiles without AP, providing critical 14-month time savings for delivery of missiles. Schedule savings projected with Long Lead will support AUR and CATM long-lead parts and materials necessary to protect the delivery schedule. Full funding for every end item requesting advance procurement is included in the budget submission. FY 2025 Advanced Procurement funding totaling $34.604M rescinded. LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 2 of 4 P-1 Line #25 Volume 1 - 308 === page 349 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2327 / AARGM-ER Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Date: April 2026 P-5 Number / Title: 1 / AARGM-ER MDAP/MAIS Code: 607 First System (2027) Award Date: December 2025 First System (2027) Completion Date: September 2028 Production Leadtime AARGM-ER Interval Between Systems: 24 Months Prior Years (Months) FY 2025 (Each) Quantity 172 When Required Cost Elements Prior Years (Months) FY 2026 (Each) FY 2025 ($ M) FY 2027 (Each) (Each) 88 FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE (4) (†) 38 19.937 - 13.268 3.538 29 0.868 - 0.809 0.109 33 11.516 - 9.535 1.563 38 0.526 - 0.357 - 33 0.426 - 0.315 - 0 - 34.604 - - Total: CFE 33.273 34.604 24.284 5.210 Total Advance Procurement/Obligation Authority 33.273 34.604 24.284 5.210 All Up Round - Specialty Materials All Up Round - Warhead (5) (†) All Up Round - CCA subcomponents (6) (†) Captive Air Training Missile - Specialty Materials (7) (†) Captive Air Training Missile - CCA subcomponents Congressional Recission (8) (†) (9) LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 3 of 4 P-1 Line #25 Volume 1 - 309 === page 350 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2327 / AARGM-ER Date: April 2026 P-5 Number / Title: 1 / AARGM-ER FY 2027 Production Leadtime QPA Cost Elements Unit Cost (Months) (Each) ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE All Up Round - Specialty Materials All Up Round - Warhead (4) (†) (5) (†) All Up Round - CCA subcomponents (6) (†) Captive Air Training Missile - Specialty Materials (7) (†) Captive Air Training Missile - CCA subcomponents Congressional Recission (8) (†) (9) 1 38 88.450 Sep 2027 40 3.538 1 29 2.725 Sep 2027 40 0.109 1 33 39.075 Sep 2027 40 1.563 1 - 1 - 0 - Total: CFE 5.210 Total Advance Procurement/Obligation Authority 5.210 Description: The AGM-88G AARGM-ER Advance Procurement (AP) funding will be used to procure long lead CFE material for subcomponents of the All Up Round and the Captive Air Training Missiles. Long lead subcomponents can include, but are not limited to, specialty materials (e.g. Inconel, Titanium, and D6AC Steel), warhead explosive material, and Circuit Card Assembly subcomponents (e.g. field programmable arrays, resistors, capacitors, and diodes). AUR and CATM CFE reflect the contractor's funding requirements for procurement of long lead parts and materials necessary to protect the delivery schedule. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (4) (5) (6) (7) (8) (9) Specialty materials may include, but is not limited to, Inconel, Titanium, and D6AC Steel. FY 2025 returned $34.604 for other higher Navy priorities. Warhead explosive material is only required in the All Up Round and not in the Captive Air Training Missile. FY 2025 returned $34.604 for other higher priorities. Circuit Card Assembly subcomponents may include, but are not limited to, field programmable arrays, processors, resistors, capacitors, and diodes. FY 2025 returned $34.604 for other higher priorities. Specialty materials may include, but are not limited to, Inconel, Titanium, and D6AC Steel. FY 2025 returned $34.604 for other higher priorities. Circuit Card Assembly subcomponents may include, but are not limited to, field programmable arrays, processors, resistors, capacitors, and diodes. FY 2025 returned $34.604 for other higher priorities. FY 2025 Congressional Recission LI 2327 - AARGM-ER Navy UNCLASSIFIED Page 4 of 4 P-1 Line #25 Volume 1 - 310 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 377.048 377.048 377.048 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - 26 26 26 25.800 69.579 0.000 69.579 205.509 207.778 211.811 - - - - 25.800 69.579 0.000 69.579 109.267 109.267 109.267 - - - - 25.800 69.579 0.000 69.579 205.509 205.509 207.778 207.778 211.811 211.811 To FY 2031 Complete 26 Continuing 216.072 Continuing 216.072 Continuing - Continuing 216.072 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - 0.00 0.00 0.00 0.00 - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - 7,904K 7,991K 8,147K 8,310K Continuing Continuing Description: SM-2 BLK IIIC: SM-2 BLK IIIC provides enhanced stream-raid performance against numerous threats, via target resolution and missile/target pairing logic, over-the-horizon capability for increased depth of fire, enhanced capability against electronic attack and improved firepower due to decreased dependence on illuminators. Effort leverages, to the maximum extent, existing SM-2 inventory and common technology to provide an affordable mix of complimentary weapons to meet a broad range of mission requirements. The inventory objective is 1,000 units. As part of the SM-6 Family of Missiles, SM-2 Block IIICU will provide the fleet with a Medium Range (MR) active missile capability. SM-2 Block IIICU is intended to project power, provide area defense, and contribute to raid annihilation. The SM-2 Block IIICU combines the tested legacy of SM-2 propulsion stack and ordnance with capability improvements developed in the SM-6 Block I Program to improve overall missile performance via an ECP to the existing SM-6. Investments for increased production start-up began in FY 2025, for procuring additional special tooling and test equipment, to support increasing SM-2 BLK IIIC production capacity to 26 missiles per year by FY 2028. [P5 / FK00079 Israel Supplemental]: FY 2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50), $47.6 million for the procurement of replenishment parts and Bench Test & Repair equipment stations for the replacement of Navy stock. LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 1 of 12 P-1 Line #26 Volume 1 - 311 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 3: Modification of Missiles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Standard Missiles Mods P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 377.048 - / 109.267 - / 25.800 - / 69.579 - / 0.000 - / 69.579 - / 377.048 - / 109.267 - / 25.800 - / 69.579 - / 0.000 - / 69.579 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget provides $69.579 million for SM-2 BLK IIIC production support. Cost Element 2.1.4: FK971 Containers: Funds procurement and support of the containers used to transport missile hardware from the component manufacturer to the missile All Up Round facility. Containers are required to return hardware from disassembled missiles to the component manufacturer for rework and follow-on build up into new AURs. Funding is required to meet two-year lead-time for delivery of components to SM production line. Cost Element 2.1.5: FK970 SM-2 Installation/Checkout Equip/Training Material: FY 2027 procures flight termination systems to support fleet firings using the new SM-2 BLK IIICU guidance section. Cost Element 2.1.6: FK980 ILS/Fleet Documentation: Funds production of formal Fleet Firing Guidance and Fleet Handling Procedures with updates as required to reflect current doctrine, new missile variant capabilities and the changing threat. Also develops and updates the Capabilities and Liabilities (C&L) documentation as well as round requirement plans for delivery and on-load for AURs for firing events. An increase for SM-2 BLK IIIC in FY 2027 is for inflation. Cost Element 2.1.7: FK850 Diminishing Manufacturing Resources (DMS): Provides funding for production engineering and life-type buys for missile components that are, or will be, no longer available through the prime contractor/sub vendors. SM-2 BLK IIIC program leverages three legacy programs (SM-2, SM-6, AMRAAM) that have been in production for more than 10 years and shares many of the same recurring obsolescence issues as the predecessor variants from which the design is derived. DMS in FY 2027 procures additional SM-2 BLK IIICU resources required to support round procurement, major obsolescence as a result of the advanced age of components, and increased requirements due to SM-2 BLK IIICU specific items, such as jet tab assemblies. Cost Element 2.1.8: FK830 Production Engineering/Support: Provides field activity and contract production support for missile modification and delivery to include production engineering, design and analysis, quality and safety assurance, documentation, and production test support for SM-2 BLKIIIC. SM-2 BLK IIIC in FY 2027 incorporates lessons learned and investigate efficiencies such as the requirement for a new TDD. LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 2 of 12 P-1 Line #26 Volume 1 - 312 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Standard Missiles Mods MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 377.048 Less PY Advance Procurement ($ in Millions) 109.267 - Net Procurement (P-1) ($ in Millions) 109.267 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 25.800 69.579 0.000 69.579 - 377.048 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - - - - 25.800 69.579 0.000 69.579 - 377.048 109.267 FY 2027 Total - - - - 25.800 69.579 0.000 69.579 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - HARDWARE Cost Recurring Cost 1.1.1) FK007 SM-2 (†) (1) 3,613K 60 216.758 - - - - - - - - - - - - - - - 1.1.4) FK007 SM-2 BLK IIIC 324,450.00 60 19.467 - - - - - - - - - - - - - - - 681,808.51 94 64.090 - - - - - - - - - - - - - - - - - - - - - - - 16.500 - - 38.500 - - - - - 38.500 - - - - - 47.600 - - - - - - - - - - - - (5) - - - - - 33.489 - - - - - - - - - - - - Subtotal: Recurring Cost - - 300.315 - - 81.089 - - 16.500 - - 38.500 - - - - - 38.500 - - 300.315 - - 81.089 - - 16.500 - - 38.500 - - - - - 38.500 - - 4.584 - - - - - - - - - - - - - - - BLK IIIC (†) (2) CANISTERS 1.1.6) FK007 SM-2 BLK IIIAZ (†) MODIFICATION 1.1.7) FK007 SM-2 BLK IIIC Transition to Production (TTP) (3) 1.1.8) FK00079 Israel Supplemental (4) 1.1.9) FK007 Production Start Up Subtotal: Hardware HARDWARE Cost Hardware - PRODUCTION Cost Non Recurring Cost 2.1.1) FK830 SM-2 BLK IIIAZ PRODUCTION LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 3 of 12 P-1 Line #26 Volume 1 - 313 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Standard Missiles Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) ENGINEERING/ SUPPORT 2.1.3) FK950 SM-2 TOOLS AND TEST EQUIPMENT - - 1.674 - - - - - - - - - - - - - - - - - 6.299 - - 2.875 - - 1.932 - - 2.991 - - - - - 2.991 - - 1.800 - - 1.800 - - - - - 2.440 - - - - - 2.440 - - 2.728 - - 0.777 - - 0.793 - - 0.809 - - - - - 0.809 - - 28.181 - - 10.947 - - 3.060 - - 10.851 - - - - - 10.851 - - 31.307 - - 11.779 - - 3.515 - - 13.988 - - - - - 13.988 2.1.9) FK980 SM-2 BLK IIIAZ ILS/FLEET DOCUMENTATION - - 0.160 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 76.733 - - 28.178 - - 9.300 - - 31.079 - - - - - 31.079 Subtotal: Hardware PRODUCTION Cost - - 76.733 - - 28.178 - - 9.300 - - 31.079 - - - - - 31.079 Gross/Weapon System Cost - - 377.048 - - 109.267 - - 25.800 - - 69.579 - - 0.000 - - 69.579 2.1.4) FK957 SM-2 CONTAINERS (6) 2.1.5) FK970 SM-2 INSTALLATION/ CHECKOUT EQUIP/ TRAINING MATERIAL 2.1.6) FK980 SM-2 BLK IIIC ILS/FLEET DOCUMENTATION (7) 2.1.7) FK850 DIMINISHING MANUFACTURING RESOURCES (8) 2.1.8) FK830 SM-2 BLK IIIC PRODUCTION ENGINEERING/ SUPPORT (†) (9) indicates the presence of a P-5a Footnotes: (1) The FY 2024 and 2027 All-Up Round (AUR) line was reduced to zero due to the delay in development of new IIICU guidance section. FY 2023 will be the last year that the SM-2 BLK IIIC AURs will be using the existing guidance section, as there will be a transition to a new guidance section upon ECP completion. (2) The FY 2025 and 2027 Canister line was reduced to zero due to the delay in development of new IIICU guidance section. LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 4 of 12 P-1 Line #26 Volume 1 - 314 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 P-1 Line Item Number / Title: 2356 / Standard Missiles Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Standard Missiles Mods MDAP/MAIS Code: (3) TTP takes hardware (HW) developed through E&MD and cleans up all white wires, produces final Bills of Materials (BOMs) and Tech Data Packages (TDPs), creates routers and work instructions (WIs), and manufactures end items to the new BOMs, WIs, and TDP artifacts. The end items are integrated into the forward flow production Test Equipment (TE) and automation at all levels, from piece part to All Up Round (AUR). TTP takes beta TE scripts and software developed during E&MD and makes them repeatable for technician level labor. The HW is run through all tests. Lesson learned and fixes are applied and the cycle is repeated. The culmination of Transition to Production (TTP) is a product that is producible, repeatable, with minimal fall-out and rework, from vendor to AUR integrator, outside of the development lab. TTP activities nominally begin 12 months prior to initial procurement award. (4) FY 2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). FY 2025 Funds are required for procurement of replenishment parts, conversion kits, and new repair equipment stations necessary to refurbish not ready for use missiles and restore standard missile inventory expended in support of DoW's response to the situation in Israel. This action does not change the purpose for which the funds were originally appropriated. (5) (6) FY 2025 investment funding for increased production startup is for the replication of special tooling and test equipment to support a combined SM-2 BLK IIICU production capacity of 26 per year by FY 2028. The increase in funding from FY 2025 to FY 2026 is for the new All-Up Round (AUR) containers and MK 4 Beam for movement of the rocket motor around the production floor. FY 2026 also procures AUR containers and the MK 4 Beam spares to cover for loss, damaged, or destroyed articles. (7) (8) An increase for SM-2 BLK IIIC in FY 2026 is for inflation. DMS in FY 2027 procures additional SM-2 BLK IIIC resources required to support round procurement, major obsolescence as a result of the advanced age of components, and increased requirements due to SM-2 BLK IIIC specific items, such as jet tab assemblies. There is a requirement to procure life of type items to support the 30-year service life of the SM-2 Block IIIC rounds. This funding is required to replace obsolete sections that will enable forward flow production to continue. FY 2023 is final procurement year for the SM-2 BLK IIIC configuration. The program is transitioning to a new SM-2 BLK IIICU configuration which provides a new TDD, guidance section, and steering control section. (9) SM-2 BLK IIIC in FY 2026 is to incorporate lessons learned and investigate efficiencies such as the requirement for a new Target Detection Device (TDD). The increase in funding from FY 2025 to FY 2026 is to prepare the forward flow production line for higher quantities demanded by the government in the future and incorporate new sections into the rounds. These changes will require revisions to the production line to institute the Engineering and Manufacturing Development phase lessons identified in areas of design, analysis, quality, safety assurance, documentation, and production test support. LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 5 of 12 P-1 Line #26 Volume 1 - 315 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 O O C Cost Elements FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Standard Missiles Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Jun 2021 Dec 2023 20 2,163K Y Jan 2018 Qty (Each) RFP Issue Date 1.1.1) FK007 SM-2 BLK IIIC (†) 2021 Raytheon CO / Tucson AZ SS / FPIF NAVSEA 1.1.1) FK007 SM-2 BLK IIIC (†) 2022 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Jun 2022 Aug 2024 20 1,949K Y Jan 2018 1.1.1) FK007 SM-2 BLK IIIC (†) 2023 Raytheon CO / Tucson AZ SS / FPIF NAVSEA May 2023 Jul 2025 20 2,146K Y Oct 2022 2021 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Aug 2021 Oct 2022 20 184,600.00 Y Mar 2021 2022 BAE / MINNEAPOLIS, MN SS / FP NAVSEA Nov 2022 Jan 2024 20 130,150.00 Y Oct 2021 BAE / MINNEAPOLIS, MN TBD NAVSEA May 2023 Jul 2024 20 261,800.00 Y Feb 2022 Raytheon CO / Tucson AZ SS / FPIF NAVSEA Aug 2017 Sep 2021 7 562,454.00 Y Dec 2015 1.1.4) FK007 SM-2 BLK IIIC CANISTERS (†) 1.1.4) FK007 SM-2 BLK IIIC CANISTERS (†) 1.1.4) FK007 SM-2 BLK IIIC CANISTERS (†) 2023 1.1.6) FK007 SM-2 BLK IIIAZ 1.1.6) FK007 SM-2 BLK IIIAZ (†) MODIFICATION 1.1.6) FK007 SM-2 BLK IIIAZ (†) MODIFICATION 1.1.6) FK007 SM-2 BLK IIIAZ (†) MODIFICATION (10) 2017 (†) MODIFICATION (†) P-1 Line Item Number / Title: 2356 / Standard Missiles Mods 2018 (11) Raytheon CO / Tucson AZ SS / FPIF NAVSEA Dec 2018 Sep 2021 33 540,488.00 Y Dec 2015 2021 (12) Raytheon CO / Tucson AZ SS / FPIF NAVSEA Dec 2021 Jun 2026 14 850,000.00 Y Aug 2020 2022 (13) Raytheon CO / Tucson AZ SS / FPIF NAVSEA Dec 2021 Aug 2026 40 722,925.00 Y Aug 2020 indicates the presence of a P-21 Footnotes: (10) (11) (12) (13) Competitive Award Single Source Lines 1.1.1 - 1.1.3: P-21 Delivery schedule, reflects contracted delivery dates. Current through P0002 Current through P0002 LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 6 of 12 P-1 Line #26 Volume 1 - 316 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) FK007 SM-2 BLK IIIC PROC QTY Item Number / Title [DODIC]: 1 / Standard Missiles Mods Fiscal Year 2017 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2016 1 OCT Calendar Year 2017 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2018 M A Y J U N Calendar Year 2018 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2021 NAVY (14) 0 20 20 1 2022 NAVY 20 0 20 20 1 2023 NAVY 20 0 20 20 20 1.1.4) FK007 SM-2 BLK IIIC CANISTERS (2) 2 2021 NAVY 20 0 20 20 2 2022 NAVY 20 0 20 20 2 2023 NAVY 20 0 20 20 1.1.6) FK007 SM-2 BLK IIIAZ MODIFICATION 3 2017 NAVY 7 0 7 3 2018 NAVY 33 0 33 A - 33 3 2021 NAVY 14 0 14 14 3 2022 NAVY 40 0 40 - - - - - - - - - - - - 7 40 O C T LI 2356 - Standard Missiles Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 317 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) FK007 SM-2 BLK IIIC PROC QTY Item Number / Title [DODIC]: 1 / Standard Missiles Mods Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2021 NAVY (14) 0 20 20 1 2022 NAVY 20 0 20 20 1 2023 NAVY 20 0 20 20 20 1.1.4) FK007 SM-2 BLK IIIC CANISTERS (2) 2 2021 NAVY 20 0 20 20 2 2022 NAVY 20 0 20 20 2 2023 NAVY 20 0 20 20 1.1.6) FK007 SM-2 BLK IIIAZ MODIFICATION 3 2017 NAVY 7 0 7 3 2018 NAVY 33 0 33 3 2021 NAVY 14 0 14 3 2022 NAVY 40 0 40 - - - - - - - - - - - - - - - - - - - - - - - 7 A - - - - - - - - - - - - - - - - - - - - - - 33 14 40 O C T LI 2356 - Standard Missiles Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 318 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) FK007 SM-2 BLK IIIC PROC QTY Item Number / Title [DODIC]: 1 / Standard Missiles Mods Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N Calendar Year 2022 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2021 NAVY (14) 0 20 1 2022 NAVY 20 0 20 1 2023 NAVY 20 0 20 20 1.1.4) FK007 SM-2 BLK IIIC CANISTERS A - - - - - - - - - - - - - - - - 20 A - - - - 20 20 (2) 2 2021 NAVY 20 0 20 2 2022 NAVY 20 0 20 A - - - - - - - - - - - - - - 20 20 2 2023 NAVY 20 0 20 20 1.1.6) FK007 SM-2 BLK IIIAZ MODIFICATION 3 2017 NAVY 7 0 7 - - - - - - - - - - - 7 3 2018 NAVY 33 0 33 - - - - - - - - - - - 33 3 2021 NAVY 14 0 14 3 2022 NAVY 40 0 40 0 A - - A O C T LI 2356 - Standard Missiles Mods Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C - J A N - F E B P-1 Line #26 - M A R - A P R - M A Y - J U N - J U L A U G - 14 - 40 S E P Volume 1 - 319 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) FK007 SM-2 BLK IIIC PROC QTY Item Number / Title [DODIC]: 1 / Standard Missiles Mods Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2021 NAVY (14) 0 20 - - - - - - - - - - - - - - 1 2022 NAVY 20 0 20 - - - - - - - - - - - - - - - - - - - - - - 1 2023 NAVY 20 0 20 A - - - - - - - - - - - - - - - 20 1.1.4) FK007 SM-2 BLK IIIC CANISTERS 1 2 2 2 2 2 2 2 2 3 0 2 2 16 - - 20 (2) 2 2021 NAVY 20 0 20 2 2022 NAVY 20 0 20 2 2023 NAVY 20 0 20 2 2 1 A - 2 - 2 - 1 - 2 - 2 - 1 2 2 1 0 - - - - - - - - A - - - - - - - - 2 2 - 1 - 2 - 2 - 1 - - 2 2 1 5 2 2 1 15 1.1.6) FK007 SM-2 BLK IIIAZ MODIFICATION 3 2017 NAVY 7 7 0 3 2018 NAVY 33 33 0 3 2021 NAVY 14 0 14 3 2022 NAVY 40 0 40 0 0 O C T LI 2356 - Standard Missiles Mods Navy - - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G UNCLASSIFIED Page 10 of 12 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #26 - M A R - A P R - M A Y - J U N - J U L A U G - 14 - 40 S E P Volume 1 - 320 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) FK007 SM-2 BLK IIIC PROC QTY Item Number / Title [DODIC]: 1 / Standard Missiles Mods Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 2021 NAVY (14) 20 0 1 2022 NAVY 20 4 16 1 2023 NAVY 20 0 20 20 1.1.4) FK007 SM-2 BLK IIIC CANISTERS 0 2 2 - 2 - 2 - 2 - 2 - 2 - 2 - 0 - - 10 - - 10 0 (2) 2 2021 NAVY 20 20 0 2 2022 NAVY 20 15 5 2 2 1 0 2 2023 NAVY 20 5 15 2 2 1 0 2 2 1 2 2 1 0 1.1.6) FK007 SM-2 BLK IIIAZ MODIFICATION 3 2017 NAVY 7 7 0 3 2018 NAVY 33 33 0 0 3 2021 NAVY 14 0 14 - - - - - - - - - - - - - - - - - - - - 14 3 2022 NAVY 40 0 40 - - - - - - - - - - - - - - - - - - - - - 0 O C T LI 2356 - Standard Missiles Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N 0 J U L 40 A U G 0 S E P Volume 1 - 321 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2356 / Standard Missiles Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 3 Item Number / Title [DODIC]: 1 / Standard Missiles Mods Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Raytheon CO - Tucson AZ 20 20 60 3 3 24 27 3 3 24 27 2 BAE - MINNEAPOLIS, MN 20 20 60 3 8 14 22 3 8 14 22 3 Raytheon CO - Tucson AZ 7 50 75 3 3 36 39 3 3 30 33 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (14) Reflects contractual delivery dates P000015 LI 2356 - Standard Missiles Mods Navy UNCLASSIFIED Page 12 of 12 P-1 Line #26 Volume 1 - 322 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 4: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2420 / Weapons Industrial Facilities Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 640.265 640.265 640.265 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 62.403 0.000 62.403 64.757 64.592 3.099 3.189 - 81.490 81.490 81.490 127.222 127.222 127.222 To FY 2031 Complete - - - - - - - - 62.403 0.000 62.403 64.757 64.592 3.099 3.189 - - - - - - - - - 62.403 0.000 62.403 64.757 64.592 3.099 3.189 - Total 1,047.017 1,047.017 1,047.017 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Weapons Industrial Facility (WIF) program supports the following NAVSEA and NAVAIR facilities within the Navy's Organic Industrial Base (OIB) for weapons: the active Naval Industrial Reserve Ordnance Plant (NIROP) Allegany Ballistics Laboratory (ABL) in Rocket Center, WV; the active Naval Surface Warfare Center Indian Head Division (NSWC IHD) in Indian Head, MD; the active Naval Air Warfare Center Weapons Division (NAWC WD China Lake) in China Lake, CA; and the inactive Naval Weapons Industrial Reserve Plant (NWIRP) in Bedford, MA. The budget provides funding for the Navy's weapons OIB to recapitalize and modernize aging plant infrastructure; enable process improvement to accelerate development, production, and support of weapon systems; resolve life, safety, and environmental issues; and enact immediate operational support of National Security needs. Capital rehabilitation projects within the Navy's weapons OIB support weapon systems such as Standard Missile (SM-2/6/3), Tomahawk Land Attack Missile (TLAM), Torpedoes, Mines, One-Way-Attack (OWA) systems, 2.75-inch rockets, Rolling Airframe Missile (RAM), Evolved Sea Sparrow Missile (ESSM), AIM-9X Sidewinder Missile, AIM-9M Sidewinder Missile, FMU-143 Penetrating Bomb Fuze System, Hellfire Missile, Guided Multiple-Launch Rocket System (GMLRS), Tomahawk, and Trident Gas Generators. FY 2027 includes investment in supply munitions bottlenecks. This funding addresses gaps in materials, hardware, and industrial base capacity. As the Navy looks to surge its organic industrial base along with the commercial industrial base, these investments will accelerate deliveries to the warfighter. [P5 / FU002 Capital Type Rehabilitation]: This program funds projects that eliminate environmental and safety deficiencies in compliance with local, state, and federal OSHA regulations. These regulations mandate requirements, which must be met if plant shuts down in order to avoid criminal liability, and severe financial penalties. The program also includes critical upgrades to maintain high liability areas such as fire and security systems, roofs, boilers, electrical distribution systems, bridge crane systems, and other structural repairs essential to maintain the industrial integrity of the plant. The funding will alleviate subtier component bottlenecks including safe and arm devices/igniters, propulsion systems, thermal batteries, airframes, control/motion/guidance systems, as well as plan and design for future surge capacity by integrating overlapping demand at component suppliers. LI 2420 - Weapons Industrial Facilities Navy UNCLASSIFIED Page 1 of 3 P-1 Line #27 Volume 1 - 323 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 2420 / Weapons Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 4: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Weapons Industrial Facilities - / 640.265 - / 81.490 - / 127.222 - / 62.403 - / 0.000 - / 62.403 P-40 Total Gross/Weapon System Cost - / 640.265 - / 81.490 - / 127.222 - / 62.403 - / 0.000 - / 62.403 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 investment sustains Navy's commitment to accelerate the munitions organic industrial base. This investment will alleviate sub-tier component bottlenecks including safe and arm devices/igniters, propulsion systems, thermal batteries, airframes, control/motion/guidance systems, as well as plan and design for future surge capacity by integrating overlapping demand at component suppliers. This investment is necessary for DoW to accelerate munitions to historically large production rates LI 2420 - Weapons Industrial Facilities Navy UNCLASSIFIED Page 2 of 3 P-1 Line #27 Volume 1 - 324 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2420 / Weapons Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Industrial Facilities MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 - Gross/Weapon System Cost ($ in Millions) 640.265 Less PY Advance Procurement ($ in Millions) Plus CY Advance Procurement ($ in Millions) - 62.403 0.000 62.403 127.222 - 640.265 - - 81.490 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 127.222 - 640.265 FY 2027 Base - 81.490 - Net Procurement (P-1) ($ in Millions) FY 2026 - - - - 62.403 0.000 62.403 - 81.490 127.222 FY 2027 Total - - - 62.403 0.000 62.403 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support Cost 1.1) FU002 Capital Type Rehabilitation - - 328.120 - - 1.490 - - 127.222 - - 62.403 - - - - - 62.403 - - 328.120 - - 1.490 - - 127.222 - - 62.403 - - - - - 62.403 2.1) FUCA1 Facilities Restoration (ABL) - - 216.205 - - 80.000 - - - - - - - - - - - - Subtotal: Support - Facilities Restoration Cost - - 216.205 - - 80.000 - - - - - - - - - - - - Subtotal: Support Cost Support - Facilities Restoration Cost Support - Government-Owned Contractor Operated (GOCO) Fac Cost 3.1) FU020 NWIRP MCGREGOR - - 95.940 - - - - - - - - - - - - - - - Subtotal: Support Government-Owned Contractor Operated (GOCO) Fac Cost - - 95.940 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 640.265 - - 81.490 - - - - 62.403 - - 0.000 - - 62.403 LI 2420 - Weapons Industrial Facilities Navy 127.222 UNCLASSIFIED Page 3 of 3 P-1 Line #27 Volume 1 - 325 === page 366 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 326 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 4: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2421 / Industrial Preparedness Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 0.640 0.000 0.640 27.424 1.875 1.408 2.071 - 33.418 Total - - - - - - - - - - - - 0.000 0.000 0.000 0.640 0.000 0.640 27.424 1.875 1.408 2.071 - 33.418 - - - - - - - - - - - - 0.000 0.000 0.000 0.640 0.000 0.640 27.424 1.875 1.408 2.071 - 33.418 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The FY 2027 request for Industrial Preparedness includes $640 thousand of discretionary and $1,154,007 thousand of mandatory (reconciliation) for a total of $1,154,647 thousand. FY 2027 total funding supports facilitization of capacity increases for GFE (Government Furnished Equipment) vendors supporting the Tomahawk Multi Year Procurement contract. The FY 2026 request for Industrial Preparedness includes $0 of discretionary and $190,000 thousand of mandatory (reconciliation) for a total of $190,000 thousand. FY 2026 total funding supports capacity investments at Raytheon and other sub-suppliers to support expanding overall production capacity up to 600 Tomahawk All Up Rounds per year. This investment is a pre-cursor to, and in support of, further expanding capacity on the Tomahawk production line up to 1,068 per year as part of the Tomahawk Multi Year Procurement contract. LI 2421 - Industrial Preparedness Navy UNCLASSIFIED Page 1 of 1 P-1 Line #28 Volume 1 - 327 === page 368 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 328 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 5: Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2500 / Ordnance Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,140.952 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,140.952 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,140.952 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 37.059 43.261 0.000 43.261 311.294 311.294 311.294 - - - - 37.059 43.261 0.000 43.261 - - - - 37.059 43.261 0.000 43.261 452.162 452.162 452.162 601.465 601.465 601.465 To FY 2031 Complete 777.897 777.897 777.897 1,001.496 Continuing - Continuing - 1,001.496 Continuing - Total - Continuing - - 1,001.496 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 2500 - Ordnance Support Equipment Navy UNCLASSIFIED Page 1 of 3 P-1 Line #29 Volume 1 - 329 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 02: Other Missiles / BSA 5: Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2500 / Ordnance Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Ordnance Support Equipment - / 1,140.952 - / 311.294 - / 37.059 - / 43.261 P-40 Total Gross/Weapon System Cost - / 1,140.952 - / 311.294 - / 37.059 - / 43.261 - / - - / 43.261 / 0.000 - / 43.261 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 2500 - Ordnance Support Equipment Navy UNCLASSIFIED Page 2 of 3 P-1 Line #29 Volume 1 - 330 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2500 / Ordnance Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 02 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Ordnance Support Equipment FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Ordnance Support Equipment - - 1,140.952 - - Subtotal: 1) Ordnance Support Equipment 1) Classified A 311.294 - - 37.059 - - 43.261 - - - - - 43.261 - - 1,140.952 - Total - - 1,140.952 - - 311.294 - - 37.059 - - 43.261 - - - - - 43.261 - 311.294 - - 37.059 - - 43.261 - - - - - 43.261 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 2500 - Ordnance Support Equipment Navy UNCLASSIFIED Page 3 of 3 P-1 Line #29 Volume 1 - 331 === page 372 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 332 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3113 / Surface Ship Torpedo Def (SSTD) Program Elements for Code B Items: N/A Other Related Program Elements: 0603506N, 0204228N Line Item MDAP/MAIS Code: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 10 10 Continuing Gross/Weapon System Cost ($ in Millions) 70.894 4.317 4.789 3.969 0.000 3.969 3.934 3.870 13.405 13.706 Continuing Less PY Advance Procurement ($ in Millions) - - - - - - - - - 70.894 4.317 4.789 3.969 0.000 3.969 3.934 3.870 13.405 Resource Summary Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years - - - - - - - - - 70.894 4.317 4.789 3.969 0.000 3.969 3.934 3.870 13.405 To FY 2031 Complete - Total Continuing Continuing - 13.706 Continuing - Continuing - - 13.706 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - 0.00 0.00 - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - 1,340K 1,371K Continuing Continuing Description: The Surface Ship Torpedo Defense (SSTD) family of systems includes Acoustic Device Countermeasures (ADCs), Countermeasure Anti-Torpedo (CAT), Torpedo Warning System (TWS) and the AN/SLQ-25 NIXIE program. The ADC is a 3-inch expendable torpedo countermeasure that provides an over-the-side soft-kill defense against threat torpedoes. This program provides ongoing production of countermeasure devices needed to sustain Fleet inventories and improvements to enhance the readiness and effectiveness of countermeasure devices on all U.S. surface ships. The ADCs are stored in Ready and Deep Stowage Lockers on DDG, CG, and CVN ships, which are also a procurement requirement for this program. TD010 - ADC HARDWARE: Funding under this cost code procures surface ship ADCs. Quantity requirements determined by Naval Munitions Requirements Process (NMRP) and shelf life of older units (reaching end of life). These requirements vary by ship type, location and operational posture. Continued procurement of Enhanced ADC MK2 Mod 8 Surface Countermeasures in FY26 that provides the Fleet with greater functionality. TD830 - PRODUCTION ENGINEERING - IN-HOUSE: Funding under this cost code provides specification preparation and validation, government prepared production acceptance procedures, production planning, Integrated Logistics Support (ILS) planning, coordination of government furnished information (GFI) and government furnished equipment (GFE), contract deliverable monitoring and prime contractor monitoring of cost/schedule performance. Also provides in-service engineering agent (ISEA) and technical direction agent (TDA) support for ADCs on surface ships. TD905 - PRODUCTION ENGINEERING CONTRACTOR: Funding under this cost code provides for production engineering tasks performed by the hardware contractor. LI 3113 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 1 of 5 P-1 Line #30 Volume 1 - 333 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3113 / Surface Ship Torpedo Def (SSTD) Program Elements for Code B Items: N/A Other Related Program Elements: 0603506N, 0204228N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / SSTD P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 70.894 - / 4.317 - / 4.789 - / 3.969 - / 0.000 - / 3.969 - / 70.894 - / 4.317 - / 4.789 - / 3.969 - / 0.000 - / 3.969 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2026 to FY 2027 funding decrease of $0.82M supports procurement of surface ship ADCs and associated support costs. LI 3113 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 2 of 5 P-1 Line #30 Volume 1 - 334 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3113 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SSTD MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 70.894 4.317 4.789 3.969 0.000 3.969 - - - - - - 70.894 4.317 4.789 3.969 0.000 3.969 - - - - - - 70.894 4.317 4.789 3.969 0.000 3.969 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) TD010 ADC (†) 6,269 47.308 257 3.072 - 1.527 - - 1.102 30 9.021 - - - - 57.856 - 1.2.1) TD010 ADC Non Recurring Costs 1.2.2) TD020 Ready Stow Lockers - - 3.472 - - Subtotal: Non Recurring Cost - 2.1) TD830 PRODUCTION ENGINEERING INHOUSE 2.2) TD905 PRODUCTION ENG-CONTRACTOR (1) 1.1.2) TD010 SYSTEMS ENG (2) 1.1.3) TD020 Ready (†) (3) Stowage Locker Subtotal: Recurring Cost 7,546.34 244 3.591 - - 1.033 - - - - 4.174 - - - - 1.200 - - - 4.672 - - 62.528 - - - 4.773 - - 0.621 300,700.00 11,953.31 14,717.21 12,986.53 297 3.857 - - - - - - - - - - - - - - - - 4.624 - - 3.857 - - - - - - - - - - - - - - - - - - - - 4.174 - - 4.624 - - - 0.143 - - 0.165 - - - - - - 12,986.53 297 3.857 - - - - - - - - - - - 3.857 - - - - - - - - - - - - - - - - - - - - - - 3.857 - - - - - 3.857 - - 0.112 - - - - - 0.112 - - - - - - - - - Non Recurring Cost Subtotal: Hardware Cost Support Cost LI 3113 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 3 of 5 P-1 Line #30 Volume 1 - 335 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3113 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SSTD MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.3) TD900 CONSULTING SERVICES - - 2.972 - - - - - - - - - - - - - - - Subtotal: Support Cost - - 8.366 - - 0.143 - - 0.165 - - 0.112 - - - - - 0.112 Gross/Weapon System Cost - - 70.894 - - 4.317 - - 4.789 - - 3.969 - - 0.000 - - 3.969 (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) Procurements of ADC MK2s have increased from QTY 244 in FY 2026 to QTY 297 in FY 2027. FY 2026 to FY 2027 funding decrease by $1.033M due to realigning funding to support the procurement of additional ADC MK2 QTYs in FY 2027. TD020 Funding removed to fund higher Navy priorities. LI 3113 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 4 of 5 P-1 Line #30 Volume 1 - 336 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Item Number / Title [DODIC]: 1 / SSTD FY Contractor and Location Method/Type or Funding Vehicle 1.1.1) TD010 ADC 2022 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD Jul 2022 Apr 2023 264 8,496.21 Y 1.1.1) TD010 ADC 2023 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD Jul 2023 Apr 2024 149 8,185.00 Y 1.1.1) TD010 ADC 2024 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD Jul 2024 Apr 2025 240 12,257.00 Y 1.1.1) TD010 ADC 2025 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD Jul 2025 Apr 2026 257 11,953.31 Y 1.1.1) TD010 ADC 2026 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD May 2026 Feb 2027 244 14,717.21 Y 1.1.1) TD010 ADC 2027 ULTRA / Braintree, MA C / IDIQ WASH NAVY YARD Jun 2027 Jun 2027 297 12,986.53 Y 1.1.3) TD020 Ready Stowage Locker 2022 QED Systems, Inc / Virginia Beach, VA C / CPFF NSWC Philadelphia May 2022 Oct 2022 10 133,130.43 Y 1.1.3) TD020 Ready Stowage Locker 2023 QED Systems, Inc / Virginia Beach, VA C / CPFF NSWC Philadelphia May 2023 Oct 2023 10 143,389.88 Y 1.1.3) TD020 Ready Stowage Locker 2024 QED Systems, Inc / Virginia Beach, VA C / CPFF NSWC Philadelphia May 2024 Oct 2024 10 146,257.68 Y Cost Elements O O C P-1 Line Item Number / Title: 3113 / Surface Ship Torpedo Def (SSTD) LI 3113 - Surface Ship Torpedo Def (SSTD) Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 5 of 5 P-1 Line #30 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 337 === page 378 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 338 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 456 85 - 141 - 141 120 120 120 120 Continuing 1,274.305 352.047 571.274 671.521 603.572 734.731 788.114 Continuing 1,274.305 1,274.305 352.047 352.047 4.581 4.581 4.581 571.274 - 0.000 - 571.274 - 0.000 - 571.274 0.000 571.274 571.274 671.521 671.521 603.572 603.572 734.731 - To FY 2031 Complete 788.114 Total Continuing Continuing Continuing - Continuing - - 734.731 788.114 Continuing Continuing 11.171 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - 9.256 16.236 11.852 - 11.852 11.848 10.757 10.948 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 2,795K 4,142K - 4,052K - 4,052K 5,596K 5,030K 6,123K 6,568K Continuing Continuing Description: The MK-48 MOD 7 Heavyweight Torpedo is the U.S. Navy's submarine launched Anti-Submarine Warfare (ASW) and primary Anti-Surface Warfare (ASuW) weapon. The Heavyweight Torpedo provides the submarine force with an effective weapon against threat submarines and surface combatants to assist in achieving Sea Control and neutralizing or destroying threats to high value vessels. Torpedoes are the only proven weapon system that provides Navy control from the sea bed to sea surface. Heavyweight AUR procurement is required to increase Warshot inventory to address increased Naval Munitions Requirement Process (NMRP) requirements gap. Additionally new funding added to support Commercial Torpedo, also knows as Rapid Affordable Procurable Torpedo (RAPTOR). The FY 2026 spend plan includes $4,581 thousand of discretionary and $381,240 thousand of mandatory (reconciliation) for a total of $385,821 thousand. The discretionary funds cover installations and Diminishing Manufacturing Sources. The mandatory funds cover the requirement for the FY2026 MK 48 MOD 7 G&C/WUK (63) for $135,550 thousand, Afterbody/Fuel Tanks Section (63) for $77,094 thousand, Engineering Services for $9,394 thousand, 22 Installs for $5,980 thousand, Diminishing Manufacturing Sources for $156 thousand, War Reserve for $14,767 thousand, Production Engineering for $7,708 thousand, Quality Assurance $2,292 thousand, Acceptance Test & Evaluation $6,303 thousand, Support and Ancillary Equipment $1,996 thousand, and $120,000 thousand for the procurement of commercial torpedoes. [P5 / G5001 - MK 48 MOD 7 Hardware]: Funding under this cost code supports the award and execution of two competitive contracts for procurement of the MK 48 MOD 7 Torpedo Guidance and Control & Warhead Electronic Systems (WES) Sections, and Afterbody Tail Cone & Fuel Tank Sections. Items in this Cost Code include: - Engineering Services / Engineering Change Proposals (ECPs) funds (1) studies (2) plans (3) design changes, and (4) implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. - Non-recurring Engineering (NRE) funding to resolve production issues including obsolescence. NRE funds (1) base contract year technology refresh due to obsolescence issues (2) production of Proof of Manufacturing (POM) units (3) first article testing (4) tooling (5) test equipment (6) procurement of technical data package updates, and (7) start-up costs for production contractors. - Installation funding for government installation and integration of MK 48 MOD 7 Guidance and Control and Afterbody Tail Cone Sections assembled into an All-Up Round (AUR). Installation costs match procurement delivery timelines. - Diminishing Manufacturing Sources (DMS) funds are provided to address obsolescence issues in the Guidance and Control (G&C)/WES and Afterbody/Tail Cone/Fuel Tank sections during the production cycle. The contractors will be required to procure and deliver DMS material for these obsolete components. [P5 / G5002 - MK 48 TI-1 Hardware]: Funding under this cost code supports the award and execution of two contracts for procurement of a new MK-48 Mod 8 Torpedo Guidance and Control & Warhead Electronic Systems (WES) Section, and Afterbody Tail Cone and Fuel Tank Sections. Mod 8 supplies a new Guidance and Control (G&C) section including new Sonar Assembly (higher density array, transmitter LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 1 of 30 P-1 Line #31 Volume 1 - 339 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition, the Mod 8 will also support improved fusing and the Improved Post Launch Communications System (IPLCS), which will supplement the existing copper guidance wire with fiber optics. Improvements are needed in the presence of advanced countermeasures, shallow water, low Doppler targets, Very Shallow Water (VSW), and to improve fusing and Anti-Surface Warfare (ASuW) performance. Mod 8 G&C Section allows full fleet introduction of the APB-6 and to meet requirements of MK-48 Improvements CDD (857-97-12). Other Items in this Cost Code include: - Engineering services / Engineering Change Proposals (ECPs) funds (1) studies, (2) plans, (3) design changes, and (4) implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. - Non-recurring Engineering (NRE) funding to resolve production issues including obsolescence. NRE funds (1) base contract year technology refresh due to obsolescence issues (2) production of Proof of Manufacturing (POM) units (3) first article testing (4) tooling (5) test equipment (6) procurement of technical data package updates, and (7) start-up costs for production contractors. - Installation funding for Government installation and integration of new MK-48 Mod 8 G&C and Afterbody Tail Cone Sections procured in prior years assembled into an MK-48 Mod 8 All-Up Round(AUR) Torpedo. Installation costs match procurement delivery timelines. - Diminishing Manufacturing Sources (DMS) funding provided to address obsolescence issues in the Mod 8 G&C and Afterbody/Tail Cone/Fuel Tank sections during the production cycle. The contractors will be required to procure and deliver DMS material for these obsolete components. [P5 / G5004 - Torpedo Other Procurement Investment]: Torpedo Other Procurement Investment: Funding under this cost code provides for additional Warhead electronics Warhead Electronics System (WES, Exploder, Sources and Sensors, and Cables) and Fuel Tanks in FY 2021 to FY 2027 utilizing a new FY21 competitive MK-48 Mod 7 G&C and (WES) contract in order to replace the Warshot Fuel Tanks and Warhead Sections in the war reserve which were used by the MK-48 Mod 7 Torpedo Program from FY 2016 to FY 2020 to assemble an All-Up Round Torpedo. Additionally, funding under this cost code also provides for the procurement of RAPTOR - Rapid Affordable Procurable Torpedo - a single mission, single use, low-cost torpedo and procurement of new improved HWT Warheads and an opportunity to improve performance over Legacy MK107 Warheads against surface and submarine target sets. [P5 / G5003 - Support and Ancillary Equipment]: Funding under this cost code provides procurement and maintenance of support, technology refresh of test equipment at Naval Undersea Warfare Centers (NUWC) Keyport (KPT) and Newport (NPT), and the contractor facility for assembly, testing and integration. [P5 / G5830 - Production Engineering]: Funding under this cost code provides for production tasks performed by NUWC NPT and KPT and includes review of contractor generated Engineering Change Proposals (ECPs), review and resolution of contractor failures and proposed corrective action, configuration management activities, contractor monitoring, risk analysis, technical problem resolution, software engineering, safety, integrated logistics support, environmental engineering, information systems, test equipment, software maintenance and updates, and refurbishment of notable test equipment to provide to the contractors. Funding maintains production specification in accordance with production processes, provides subject matter experts to support root cause analysis of failed contractor hardware, and monitors contractor defect and reduction processes to ensure deficiencies are effectively addressed. Funding is also provided for program office acquisition support. [P5 / G5840 - Quality Assurance]: Funding under this cost code provides for quality assurance (QA) tasks performed by NUWC Keyport (KPT) and Newport (NPT) including: QA review of the contractor and subcontractor data, review of documentation indicating conformity to product performance requirements, and review of objective quality evidence. [P5 / G5860 - Acceptance T&E]: Funding under this cost code provides for integration and production acceptance testing of prime contractor hardware sections in an MK 48 MOD 7 All-Up Round (AUR) Torpedo. LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 2 of 30 P-1 Line #31 Volume 1 - 340 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / MK-48 Torpedo P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 456 / 1,274.305 85 / 352.047 - / 4.581 141 / 571.274 - / 0.000 141 / 571.274 456 / 1,274.305 85 / 352.047 - / 4.581 141 / 571.274 - / 0.000 141 / 571.274 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Program changes: ITEM 1.1.1 MK48 Mod 7 Guidance & Control (G&C) / Warhead Upgrade Kit (WUK) Section - Overall funding for the MK48 Mod 7 G&C / WUK Section cost increased from FY2026 Qty 63 (mandatory) to FY2027 Qty 78. MK48 Mod 7 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date, but unit prices are currently projected to increase by 5% per year to account for subsequent workforce costs and higher than general inflation. Also, many of the materials like electronics and explosive components used in the G&C / WUK Section due to world-wide supply chain disruption have increased unit prices above increase above general inflation. ITEM 1.1.2 MK48 Afterbody Tail Cone (ABTC) / Fuel Tank (FT) Section - Overall funding for the MK48 ABTC / FT Section cost increased from FY2026 Qty 63 (mandatory) to FY2027 Qty 78. MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Step Ladder unit prices. ITEM 1.1.3 Contractor Engineering Services / Engineering Change Proposal (ECP): FY2027 Funding increases from FY2026 (mandatory) funding level for MK48 HWT Mod 7 AUR G&C/WUK and ABTC/FT Contractor Engineering Services and ECPs to address an increase End of Life obsolescence issues and design changes associated and failed hardware resolution. ITEM 1.1.4 Installation: Reduced funding requested in FY2027 to support 28 MK48 AUR Installations that are scheduled to be installed from prior year procurements per P-21 G&C Section delivery schedule vice the planned 55 MK48 AUR installations that are planned in FY2026. ITEM 2.1.1 MK48 Mod 8 TI-1 Guidance & Control (G&C) / Warhead Upgrade Kit (WUK) Section - This funding in the amount of $89,240K starts in FY2027 for the procurement of the MK48 Mod 7 G&C / WUK Section. FY2027 and out MK48 Mod 8 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date and planned to award in May 2027. Mod 8 TI-1 G&C / WUK Unit prices are based on current Government Estimate and are currently projected to increase by 5% per year to account for subsequent workforce costs higher than general inflation. ITEM 2.1.2 MK48 Afterbody Tail Cone (ABTC) / Fuel Tank (FT) Section - This funding in the amount of $71,755K starts in FY2027 for the procurement of MK48 ABTC / FT Section as part of the MK48 Mod 8 Tech Insertion All-Up-Round procurements quantity 55. The FY2027 MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Step Ladder unit prices. ITEM 2.1.3 Contractor Engineering Services / Engineering Change Proposal (ECP): Funding starts MK48 Mod 8 HWT TI AUR in FY2027 in the amount $6,365K for FY2027 Contractor Engineering Services and ECPs to address test set and hardware related design changes and failed hardware. ITEM 3.1.2 RAPTor: Funding increase from $0M in FY 2026 to $12.286M in FY 2027 for RAPTOR transition from RDTEN RECON funded to procurement. ITEM 3.1.3 Warhead Electronics: Funding increased due to increase in procurement quantities of War Reserve Warhead Electronics Qty 19 in FY2026 (mandatory) compared to Warheads Electronics Qty 70 in FY2027. FY2027 Warhead Electronic unit prices have not been negotiated to date for War Reserve component as of yet, but Warhead Electronic unit prices are currently projected to increase by 5% per year to account for subsequent workforce costs higher than general inflation. Also, many of the materials like electronic and explosive components used in the G&C / WUK Section due to world-wide supply LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 3 of 30 P-1 Line #31 Volume 1 - 341 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A chain disruption have increased unit prices above general inflation projected unit cost. This cost code is used to replace the Warhead Sections in the war reserve, which were used by the MK-48 Mod 7 Torpedo Program from FY 2016 contracts to assemble an All-Up Round Torpedo. FY26 Reconciliation Funding (Changes referenced below regarding FY2026 WPN Funding and Qty include the combination of both FY2026 Discretionary and Mandatory funding): 1.1.1) MOD 7 Guidance & Control (G&C) Section - FY 2026 includes $0 discretionary funding plus reconciliation funding for 63 G&C kits for $135,550K. FY2026 MK48 Mod 7 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date, but unit prices are currently projected to increase by 5% per year from FY2025 G&C/WUK Section unit price of $2,043K Qty 79 to FY2026 G&C/WUK Section unit price of $2,152K Qty 63 to account for subsequent workforce costs higher than general inflation. Also, many of the materials like electronic and explosive components used in the G&C / WUK Section due to world-wide supply chain disruption have increased unit prices above increase above general inflation. 1.1.2) Afterbody/Tail Cone - FY 2026 includes $0 discretionary funding plus reconciliation funding for 63 Afterbody/Tail Cones for $77,094K. FY 2026 MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Option 4 Step Ladder unit prices. FY2025 MK48 ABTC / FT Section unit price of $1,122K Qty 85 to FY2026 ABTC / FT Section unit price of $1,224K Qty 63 due to higher stepladder price which accounts for the 9.0% Unit Price increase from FY 2025 to FY 2026. 1.1.3) Contractor Engineering Services / ECPs - FY 2026 includes $0 discretionary funding plus reconciliation funding for Contractor Engineering Services for $9,394K. 1.1.4) Installation - FY 2026 includes $4,487K discretionary funding for 51 installs plus reconciliation funding for 22 installs for $5,980K. 1.1.5) Diminishing Manufacturing Sources - FY 2026 includes $94K discretionary funding plus reconciliation funding for $156K for Diminishing Manufacturing Sources. 1.2.2) SUB Industrial Factory Equipment & Facility Improvements - Decreased funding to $0M in FY 2026. FY2025 $6,100K was a one-time increase for test equipment to address throughput of increased procurement and install quantities in outyears. 3.1.1) Warhead Electronics - FY 2026 includes $0K discretionary funding plus reconciliation funding for 19 Warhead Electronics for $11,622K. 3.1.2) Fuel Tank War Reserve - FY 2026 includes $0K discretionary funding plus reconciliation funding for 14 War Reserve Fuel Tanks for $3,145K. 4.1) Support and Ancillary Equipment- FY 2026 includes $0K discretionary funding plus reconciliation funding for Support and Ancillary Equipment for $1,996K. 5.1) Production Engineering (In-House & Ctr) - FY 2026 includes $0K discretionary funding plus reconciliation funding for Production Engineering for $7,708K. 6.1) Quality Assurance - FY 2026 includes $0K discretionary funding plus reconciliation funding for Quality Assurance for $2,292K. 7.1) Acceptance T&E - FY 2026 includes $0K discretionary funding plus reconciliation funding for Acceptance T&E for $6,303K. LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 4 of 30 P-1 Line #31 Volume 1 - 342 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 456 85 1,274.305 352.047 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Total Obligation Authority ($ in Millions) - 1,274.305 - 0.000 - 4.581 571.274 - 571.274 - 352.047 141 0.000 - 4.581 FY 2027 Total - 571.274 - 352.047 FY 2027 OOC 141 4.581 - 1,274.305 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - 571.274 - 571.274 0.000 571.274 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) - 9.256 10.695 11.852 - 11.852 2,795K 4,142K - 4,052K - 4,052K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - G5001 - MK 48 MOD 7 Hardware Cost Recurring Cost 1.1.1) MOD 7 Guidance & Control (†) (1) (G&C) Section 1.1.2) Afterbody/Tail Cone (†) (2) 1,138K 397 451.630 2,043K 79 161.369 - - - 2,250K 86 193.477 - - - 2,250K 86 193.477 957,929.47 397 380.298 1,123K 79 88.711 - - - 1,158K 86 99.602 - - - 1,158K 86 99.602 - - 105.212 - - 10.075 - - - - - 10.808 - - - - - 10.808 - - 16.595 - - 15.755 - - 4.521 - - 6.919 - - - - - 6.919 - - 4.050 - - 0.250 - - 0.060 - - 0.250 - - - - - 0.250 - - 957.785 - - 276.160 - - 4.581 - - 311.056 - - - - - 311.056 - - 125.649 - - - - - - - - - - - - - - - - - - - 6.100 - - - - - - - - - - - - - - - - 6.100 - - - - - - - - - - - - 1.1.3) Contractor Engineering Services / ECPs (3) 1.1.4) Installation (4) 1.1.5) Diminishing Manufacturing Sources (5) Subtotal: Recurring Cost Non Recurring Cost 1.2.1) Non-Recurring Engineering 1.2.2) SUB Industrial Factory Equipment & Facility Improvements - (6) Subtotal: Non Recurring Cost LI 3117 - MK-48 Torpedo Navy 125.649 UNCLASSIFIED Page 5 of 30 P-1 Line #31 Volume 1 - 343 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Hardware - G5001 - MK 48 MOD 7 Hardware Cost - FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - ($) 1,083.434 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - - ($) 282.260 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 4.581 - - 311.056 - - - - - 311.056 Hardware - G5002 - MK 48 TI-1 Hardware Cost Recurring Cost 2.1.1) MOD 8 Guidance & Control - - - - - - - - - 1,623K 55 89.240 - - - 1,623K 55 89.240 - - - - - - - - - 1,305K 55 71.755 - - - 1,305K 55 71.755 - - - - - - - - - - - 7.980 - - - - - 7.980 Subtotal: Recurring Cost - - - - - - - - - - - 168.975 - - - - - 168.975 Subtotal: Hardware - G5002 - MK 48 TI-1 Hardware Cost - - - - - - - - - - - 168.975 - - - - - 168.975 - - - - - - - - - - 12.286 - - - - - 12.286 481,564.36 101 48.638 582,576.00 44 25.633 - - - 642,285.71 70 44.960 - - - 642,285.71 70 44.960 188,338.58 127 23.919 208,972.97 35 7.314 - - - 219,315.07 70 15.352 - - - 219,315.07 70 15.352 - - 72.557 - - 32.947 - - - - - 72.598 - - - - - 72.598 - - 72.557 - - 32.947 - - - - - 72.598 - - - - - 72.598 (†) (7) (G&C) Section 2.1.2) Afterbody/Tail Cone Section (†) (8) 2.1.3) Contractor Engineering Services / ECPs (9) Hardware - G5004 - Torpedo Other Procurement Investment Cost Recurring Cost (10) 3.1.2) RAPTor 3.1.3) Warhead (†) (11) Electronics 3.1.4) Fuel Tank War Reserve (†) (12) - Subtotal: Recurring Cost Subtotal: Hardware G5004 - Torpedo Other Procurement Investment Cost Hardware - CAZ3G51 - MOD 7 AUR CONGRESSIONAL ADD Cost Recurring Cost 4.1.1) MOD 7 Guidance & Control - - - 2,017K 6 12.103 - - - - - - - - - - - - (†) - - - 1,109K 6 6.653 - - - - - - - - - - - - 4.1.3) Engineering SVCS Contractor - - - - - 0.144 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 18.900 - - - - - - - - - - - - (†) (G&C) Section 4.1.2) AB/TC Section LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 6 of 30 P-1 Line #31 Volume 1 - 344 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Hardware CAZ3G51 - MOD 7 AUR CONGRESSIONAL ADD Cost - FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - 18.900 - - - - - - - - - - - - Support - G5003 - Support and Ancillary Equipment Cost 5.1) Support and Ancillary Equipment Subtotal: Support - G5003 - Support and Ancillary Equipment Cost - - 14.295 - - 1.957 - - - - - 2.016 - - - - - 2.016 - - 14.295 - - 1.957 - - - - - 2.016 - - - - - 2.016 Support - G5830 - Production Engineering Cost 6.1) Production Engineering (In-House & Ctr) - - 57.520 - - 7.557 - - - - - 7.862 - - - - - 7.862 Subtotal: Support - G5830 Production Engineering Cost - - 57.520 - - 7.557 - - - - - 7.862 - - - - - 7.862 Support - G5840 - Quality Assurance Cost 7.1) Quality Assurance - - 14.801 - - 2.247 - - - - - 2.338 - - - - - 2.338 Subtotal: Support - G5840 Quality Assurance Cost - - 14.801 - - 2.247 - - - - - 2.338 - - - - - 2.338 Support - G5860 - Acceptance T&E Cost 8.1) Acceptance T&E - - 31.698 - - 6.179 - - - - - 6.429 - - - - - 6.429 Subtotal: Support - G5860 Acceptance T&E Cost - - 31.698 - - 6.179 - - - - - 6.429 - - - - - 6.429 Gross/Weapon System Cost 2,795K 456 1,274.305 4,142K 85 352.047 - - 4.581 4,052K 141 571.274 - - 0.000 4,052K 141 571.274 (†) indicates the presence of a P-5a Footnotes: (1) EM 1.1.1 MK48 Mod 7 Guidance & Control (G&C) / Warhead Upgrade Kit (WUK) Section - Overall funding for the MK48 Mod 7 G&C / WUK Section cost increased from FY2026 Qty 63 (mandatory) to FY2027 Qty 78. MK48 Mod 7 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date, but unit prices are currently projected to increase by 5% per year to account for subsequent workforce costs and higher than general inflation. Also, many of the materials like electronics and explosive components used in the G&C / WUK Section due to world-wide supply chain disruption have increased unit prices above increase above general inflation. (2) ITEM 1.1.2 MK48 Afterbody Tail Cone (ABTC) / Fuel Tank (FT) Section - Overall funding for the MK48 ABTC / FT Section cost increased from FY2026 Qty 63 (mandatory) to FY2027 Qty 78. MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Step Ladder unit prices. (3) ITEM 1.1.3 Contractor Engineering Services / Engineering Change Proposal (ECP): FY2027 Funding increases from FY2026 (mandatory) funding level for MK48 HWT Mod 7 AUR G&C/WUK and ABTC/FT Contractor Engineering Services and ECPs to address an increase End of Life obsolescence issues and design changes associated and failed hardware resolution. LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 7 of 30 P-1 Line #31 Volume 1 - 345 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 P-1 Line Item Number / Title: 3117 / MK-48 Torpedo ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo MDAP/MAIS Code: (4) ITEM 1.1.4 Installation: Reduced funding requested in FY2027 to support 28 MK48 AUR Installations that are scheduled to be installed from prior year procurements per P-21 G&C Section delivery schedule vice the planned 73 55 MK48 AUR installations that are planned in FY2026 (mandatory). (5) (6) ITEM 1.1.5 Diminishing Manufacturing Sources - FY 2026 includes $94K discretionary funding plus reconciliation funding for $156K for Diminishing Manufacturing Sources. ITEM 1.2.2 SUB Industrial Factory Equipment & Facility Improvements: Decreased funding to $0M in FY2026. FY2025 $6.100M was a one-time increase for test equipment to address throughput of increased procurement and install quantities in outyears. (7) ITEM 2.1.1 MK48 Mod 8 TI-1 Guidance & Control (G&C) / Warhead Upgrade Kit (WUK) Section - This funding in the amount of $89,240K starts in FY2027 for the procurement of the MK48 Mod 8 G&C / WUK Section. FY2027 and out MK48 Mod 8 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date and planned to award in May 2027. Mod 8 TI-1 G&C / WUK Unit prices are based on current Government Estimate and are currently projected to increase by 5% per year to account for subsequent workforce costs higher than general inflation. (8) ITEM 2.1.2 MK48 Afterbody Tail Cone (ABTC) / Fuel Tank (FT) Section - This funding in the amount of $71,755K starts in FY2027 for the procurement of MK48 ABTC / FT Section as part of the MK48 Mod 8 Tech Insertion All-Up-Round procurements quantity 55. The FY2027 MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Step Ladder unit prices. (9) ITEM 2.1.3 Contractor Engineering Services / Engineering Change Proposal (ECP): Funding starts MK48 Mod 8 HWT TI AUR in FY2027 in the amount $7,650K for FY2027 Contractor Engineering Services and ECPs to address test set and hardware related design changes and failed hardware. (10) (11) ITEM 3.1.2 RAPTor: Funding increase from $0M in FY26 to $12.286M in FY27 for RAPTOR transition from RDTEN RECON funded to procurement. ITEM 3.1.3 Warhead Electronics: Funding increased due to increase in procurement quantities of War Reserve Warhead Electronics Qty 19 in FY2026 compared to Warheads Electronics Qty 70 in FY2027. FY2027 Warhead Electronic unit prices have not been negotiated to date for War Reserve component as of yet, but Warhead Electronic unit prices are currently projected to increase by 5% per year to account for subsequent workforce costs higher than general inflation. Also, many of the materials like electronic and explosive components used in the G&C / WUK Section due to world-wide supply chain disruption have increased unit prices above general inflation projected unit cost. This cost code is used to replace the Warhead Sections in the war reserve, which were used by the MK-48 Mod 7 Torpedo Program from FY 2016 contracts to assemble an All-Up Round Torpedo. (12) ITEM 3.1.4 Fuel Tanks: Funding increased due to increase in procurement quantities of Fuel Tank Qty 14 in FY2026 compared to Fuel Tanks Qty 70 in FY2027. War Reserve Components Quantity are constrained by funding and unit cost. This cost code is used to replace the Warshot Fuel Tanks in the war reserve, which were used by the MK-48 Mod 7 Torpedo Program from FY 2016 contracts to assemble an All-Up Round Torpedo. LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 8 of 30 P-1 Line #31 Volume 1 - 346 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 O O C Cost Elements 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) 1.1.1) MOD 7 Guidance & Control (G&C) Section (†) (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone LI 3117 - MK-48 Torpedo Navy FY 2016 2017 2018 P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Contractor and Location G&C Section LMS FY16 (13) / Marion, MA G&C Section LMS - FY17 Option 1 (14) / Marion, MA G&C Section LMS - FY18 Option 2 (15) / Marion, MA Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-48 Torpedo Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) C / FFP NAVSEA May 2016 Apr 2022 8 1,418K Y C / FFP NAVSEA Sep 2017 Mar 2023 18 600,930.00 Y C / FFP NAVSEA Aug 2018 Oct 2023 41 591,036.44 Y Qty (Each) 2019 G&C Section LMS - FY19 Option 3 / Marion, MA C / FFP NAVSEA Jun 2019 Mar 2024 53 536,195.85 Y 2020 G&C Section LMS - FY20 Option 4 / Marion, MA C / FFP NAVSEA Sep 2020 Sep 2024 71 533,436.62 Y 2021 G&C Section LMS - FY21 Option 5 / Marion, MA C / FFP NAVSEA Nov 2021 Apr 2025 82 1,147K Y 2022 G&C Section + WES + Exploder Arming Device - LMS - FY22 Base Year / Syracuse, NY C / FFP NAVSEA Dec 2022 Jan 2026 22 1,913K Y 2023 G&C Section + WES + Exploder Arming Device - LMS - FY23 Option 1 / Syracuse, NY C / FFP NAVSEA Dec 2023 Mar 2026 28 1,895K Y 2024 G&C Section + WES + Exploder Arming Device - LMS - FY24 Option 2 / Syracuse, NY C / FFP NAVSEA Jul 2024 Jul 2027 74 1,947K Y 2025 G&C Section + WES + Exploder Arming Device - LMS - FY25 Option 3 / Syracuse, NY C / FFP NAVSEA Sep 2025 Sep 2028 79 2,043K Y 2027 G&C Section + WES + Exploder Arming Device - LMS - FY27 Option 5 / Syracuse, NY C / FFP NAVSEA Jul 2027 Jul 2030 86 2,250K Y 2016 Afterbody/Tail Cone Section SAIC - FY16 / Mclean, VA C / FFP NAVSEA Sep 2016 Jun 2020 8 933,250.00 Y 2017 Afterbody/Tail Cone Section SAIC - FY17 / Mclean, VA C / FFP NAVSEA Sep 2017 Jul 2020 18 856,853.00 Y 2018 Afterbody/Tail Cone Section SAIC - FY18 / Mclean, VA C / FFP NAVSEA Jun 2018 Feb 2021 41 803,054.22 Y 2019 Afterbody/Tail Cone Section SAIC - FY19 / Mclean, VA C / FFP NAVSEA Sep 2019 Sep 2021 53 830,309.64 Y 2020 Afterbody/Tail Cone Section SAIC - FY20 / Mclean, VA C / FFP NAVSEA Aug 2020 Sep 2022 71 826,690.14 Y 2021 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY21 Base / Reston, VA C / FFP NAVSEA Nov 2021 Aug 2024 82 1,021K Y UNCLASSIFIED Page 9 of 30 P-1 Line #31 RFP Issue Date May 2015 Jul 2015 Volume 1 - 347 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 O O C Cost Elements (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone (†) 1.1.2) Afterbody/Tail Cone 2.1.1) MOD 8 Guidance & Control (G&C) Section (†) 2.1.2) Afterbody/Tail Cone Section (†) 3.1.3) Warhead Electronics (†) 3.1.3) Warhead Electronics (†) 3.1.3) Warhead Electronics (†) 3.1.3) Warhead Electronics (†) 3.1.3) Warhead Electronics (†) 3.1.4) Fuel Tank War Reserve (†) 3.1.4) Fuel Tank War Reserve (†) 3.1.4) Fuel Tank War Reserve (†) 3.1.4) Fuel Tank War Reserve (†) 3.1.4) Fuel Tank War Reserve (†) LI 3117 - MK-48 Torpedo Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-48 Torpedo Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2022 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY22 Option 1 / Reston, VA C / FFP NAVSEA Feb 2023 Apr 2025 22 1,093K Y 2023 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY23 Option 1 / Reston, VA C / FFP NAVSEA Feb 2023 Jun 2025 28 1,083K Y 2024 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY24 Option 2 / Reston, VA C / FFP NAVSEA May 2024 Sep 2026 74 1,128K Y 2025 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY25 Option 3 / Reston, VA C / FFP NAVSEA Apr 2025 Jun 2027 79 1,123K Y 2027 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY27 Option 5 / Reston, VA C / TBD NAVSEA Apr 2027 Jun 2029 86 1,158K Y 2027 MK-48 Mod 8 TI-1 G&C Section - General Dynamic Mission Systems / Manassas, VA C / FFP NAVSEA May 2027 Nov 2029 55 1,623K Y 2027 Afterbody/Tail Cone Section + Fuel Tank - SAIC / Reston, VA C / FFP NAVSEA Apr 2027 Jun 2029 55 1,305K Y 2022 WES + Exploder Arming Device LMS - FY22 Base / Syracuse, NY SS / FFP NAVSEA Dec 2022 Mar 2026 30 528,413.00 Y 2023 WES + Exploder Arming Device LMS - FY23 Base / Syracuse, NY SS / FFP NAVSEA Dec 2022 Jun 2026 34 528,413.00 Y 2024 WES + Exploder Arming Device LMS - FY24 Option 1 / Syracuse, NY SS / FFP NAVSEA Jul 2024 Jul 2027 37 529,270.27 Y 2025 WES + Exploder Arming Device LMS - FY25 Option 2 / Syracuse, NY SS / FFP NAVSEA Jul 2025 Jul 2028 44 582,576.00 Y 2027 WES + Exploder Arming Device LMS - FY27 Option 4 / Syracuse, NY SS / FFP NAVSEA Jul 2027 Jul 2030 70 642,285.71 Y 2021 Fuel Tank - SAIC- FY21 Base / Reston, VA C / FFP NAVSEA Nov 2021 Jan 2025 32 188,218.75 Y 2022 Fuel Tank - SAIC- FY22 Option 1 / Reston, VA C / FFP NAVSEA Feb 2023 May 2025 30 208,605.00 Y 2023 Fuel Tank - SAIC- FY23 Option 2 / Reston, VA C / FFP NAVSEA Feb 2023 Jul 2025 25 208,605.00 Y 2024 Fuel Tank - SAIC- FY24 Option 3 / Reston, VA C / FFP NAVSEA May 2024 Feb 2027 40 202,300.00 Y 2025 Fuel Tank - SAIC- FY25 Option 4 / Reston, VA C / FFP NAVSEA Apr 2025 Jun 2027 35 208,972.97 Y UNCLASSIFIED Page 10 of 30 P-1 Line #31 (Each) RFP Issue Date Volume 1 - 348 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 O O C Cost Elements 3.1.4) Fuel Tank War Reserve (†) 4.1.1) MOD 7 Guidance & Control (G&C) Section 4.1.2) AB/TC Section (†) P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-48 Torpedo Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2027 Fuel Tank - SAIC- FY27 Option 6 / Reston, VA C / FFP NAVSEA Apr 2027 Jun 2029 70 219,315.07 Y 2025 G&C Section + WES + Exploder Arming Device - LMS - FY25 Option 3 / Syracuse, NY C / FFP NAVSEA Sep 2025 Sep 2028 6 2,017K Y 2025 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY25 Option 3 / Reston, VA C / FFP ** NO PCO ** Apr 2026 Dec 2027 6 1,109K Y (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (13) (14) (15) MSR and EOQ have not yet been determined by the contractor. MSR and EOQ have not yet been determined by the contractor. MSR and EOQ have not yet been determined by the contractor. LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 11 of 30 P-1 Line #31 Volume 1 - 349 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 0 8 2 2017 NAVY 18 0 18 3 2018 NAVY 41 0 41 41 4 2019 NAVY 53 0 53 53 5 2020 NAVY 71 0 71 71 6 2021 NAVY 82 0 82 82 7 2022 NAVY 22 0 22 22 8 2023 NAVY 28 0 28 28 9 2024 NAVY 74 0 74 74 10 2025 NAVY 79 0 79 79 11 2027 NAVY 86 0 86 86 1.1.2) Afterbody/Tail Cone A - - - - - - - - - - - - - - - - - 8 A - 18 (2) 12 2016 NAVY 8 0 8 13 2017 NAVY 18 0 18 14 2018 NAVY 41 0 41 41 15 2019 NAVY 53 0 53 53 16 2020 NAVY 71 0 71 71 17 2021 NAVY 82 0 82 82 18 2022 NAVY 22 0 22 22 19 2023 NAVY 28 0 28 28 20 2024 NAVY 74 0 74 74 21 2025 NAVY 79 0 79 79 22 2027 NAVY (16) 0 86 86 0 55 55 55 0 55 55 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics A - - - - - - - - - - - - - 8 A - 18 (7) (8) (11) 25 2022 NAVY 30 0 30 30 26 2023 NAVY 34 0 34 34 27 2024 NAVY 37 0 37 37 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 350 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Fiscal Year 2017 Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 28 2025 NAVY 44 0 44 44 29 2027 NAVY 70 0 70 70 3.1.4) Fuel Tank War Reserve (12) 30 2021 NAVY 32 0 32 32 31 2022 NAVY 30 0 30 30 32 2023 NAVY 25 0 25 25 33 2024 NAVY 40 0 40 40 34 2025 NAVY 35 0 35 35 35 2027 NAVY 70 0 70 70 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 351 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 0 8 - - - - - - - - - - - - - - - - - - - - - - - - 8 2 2017 NAVY 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 3 2018 NAVY 41 0 41 A - - - - - - - - - - - - - - 41 4 2019 NAVY 53 0 53 A - - - - 53 5 2020 NAVY 71 0 71 71 6 2021 NAVY 82 0 82 82 7 2022 NAVY 22 0 22 22 8 2023 NAVY 28 0 28 28 9 2024 NAVY 74 0 74 74 10 2025 NAVY 79 0 79 79 11 2027 NAVY 86 0 86 86 1.1.2) Afterbody/Tail Cone (2) 12 2016 NAVY 8 0 8 - - - - - - - - - - - - - - - - - - - - - - - - 8 13 2017 NAVY 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 14 2018 NAVY 41 0 41 A - - - - - - - - - - - - - - - - 41 15 2019 NAVY 53 0 53 A - 53 16 2020 NAVY 71 0 71 71 17 2021 NAVY 82 0 82 82 18 2022 NAVY 22 0 22 22 19 2023 NAVY 28 0 28 28 20 2024 NAVY 74 0 74 74 21 2025 NAVY 79 0 79 79 22 2027 NAVY (16) 0 86 86 0 55 55 55 0 55 55 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics (7) (8) (11) 25 2022 NAVY 30 0 30 30 26 2023 NAVY 34 0 34 34 27 2024 NAVY 37 0 37 37 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 352 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Fiscal Year 2019 Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 28 2025 NAVY 44 0 44 44 29 2027 NAVY 70 0 70 70 3.1.4) Fuel Tank War Reserve (12) 30 2021 NAVY 32 0 32 32 31 2022 NAVY 30 0 30 30 32 2023 NAVY 25 0 25 25 33 2024 NAVY 40 0 40 40 34 2025 NAVY 35 0 35 35 35 2027 NAVY 70 0 70 70 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 353 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 0 8 - - - - - - - - - - - - - - - - - - - - - - - - 8 2 2017 NAVY 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 3 2018 NAVY 41 0 41 - - - - - - - - - - - - - - - - - - - - - - - - 41 4 2019 NAVY 53 0 53 - - - - - - - - - - - - - - - - - - - - - - - - 53 5 2020 NAVY 71 0 71 A - - - - - - - - - - - - - 71 6 2021 NAVY 82 0 82 82 7 2022 NAVY 22 0 22 22 8 2023 NAVY 28 0 28 28 9 2024 NAVY 74 0 74 74 10 2025 NAVY 79 0 79 79 11 2027 NAVY 86 0 86 86 1.1.2) Afterbody/Tail Cone (2) 12 2016 NAVY 8 0 8 - - - - - - - - 13 2017 NAVY 18 0 18 - - - - - - - - - 14 2018 NAVY 41 0 41 - - - - - - - - - - - - - - - - 15 2019 NAVY 53 0 53 - - - - - - - - - - - - - - - - - - - - - - - 16 2020 NAVY 71 0 71 A - - - - - - - - - - - - - 17 2021 NAVY 82 0 82 82 18 2022 NAVY 22 0 22 22 19 2023 NAVY 28 0 28 28 20 2024 NAVY 74 0 74 74 21 2025 NAVY 79 0 79 79 22 2027 NAVY (16) 0 86 86 0 55 55 55 0 55 55 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics 4 4 0 5 3 5 5 0 4 6 7 8 8 8 0 6 - 47 71 (7) (8) (11) 25 2022 NAVY 30 0 30 30 26 2023 NAVY 34 0 34 34 27 2024 NAVY 37 0 37 37 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 354 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 28 2025 NAVY 44 0 44 44 29 2027 NAVY 70 0 70 70 3.1.4) Fuel Tank War Reserve (12) 30 2021 NAVY 32 0 32 32 31 2022 NAVY 30 0 30 30 32 2023 NAVY 25 0 25 25 33 2024 NAVY 40 0 40 40 34 2025 NAVY 35 0 35 35 35 2027 NAVY 70 0 70 70 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 355 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 0 8 - - - - - - - - - - 2 2017 NAVY 18 0 18 - - - - - - - - - - - - - - - - - 3 2018 NAVY 41 0 41 - - - - - - - - - - - - - - - - - - - - - - - - 41 4 2019 NAVY 53 0 53 - - - - - - - - - - - - - - - - - - - - - - - - 53 5 2020 NAVY 71 0 71 - - - - - - - - - - - - - - - - - - - - - - - - 71 6 2021 NAVY 82 0 82 A - - - - - - - - - - - - - - - - - - - - - - - 82 7 2022 NAVY 22 0 22 A - - - - - - - - - - 22 8 2023 NAVY 28 0 28 28 9 2024 NAVY 74 0 74 74 10 2025 NAVY 79 0 79 79 11 2027 NAVY 86 0 86 86 1.1.2) Afterbody/Tail Cone 1 1 1 1 1 1 2 0 1 4 4 9 0 (2) 12 2016 NAVY 8 8 0 0 13 2017 NAVY 18 18 0 0 14 2018 NAVY 41 41 0 15 2019 NAVY 53 6 47 16 2020 NAVY 71 0 71 17 2021 NAVY 82 0 82 18 2022 NAVY 22 0 19 2023 NAVY 28 0 20 2024 NAVY 74 0 74 74 21 2025 NAVY 79 0 79 79 22 2027 NAVY (16) 0 86 86 0 55 55 55 0 55 55 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics 0 6 6 - 6 6 6 7 7 3 0 - - - - - - - - - - A - - - - - - - - - - 7 7 - 7 - 7 - 7 - 7 - 7 7 7 8 0 - - - - - - - - 82 22 A - - - - - - - - 22 28 A - - - - - - - - 28 (7) (8) (11) 25 2022 NAVY 30 0 30 A - - - - - - - - - - 30 26 2023 NAVY 34 0 34 A - - - - - - - - - - 34 27 2024 NAVY 37 0 37 37 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 356 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 28 2025 NAVY 44 0 44 44 29 2027 NAVY 70 0 70 70 3.1.4) Fuel Tank War Reserve (12) 30 2021 NAVY 32 0 32 - - - - - - - - 32 31 2022 NAVY 30 0 30 A - A - - - - - - - - 30 32 2023 NAVY 25 0 25 A - - - - - - - - 25 33 2024 NAVY 40 0 40 40 34 2025 NAVY 35 0 35 35 35 2027 NAVY 70 0 70 - - - - - - - - - - - - - 70 O C T LI 3117 - MK-48 Torpedo Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 357 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 8 0 2 2017 NAVY 18 18 0 3 2018 NAVY 41 0 41 4 2019 NAVY 53 0 53 - - - - - 5 2020 NAVY 71 0 71 - - - - - 6 2021 NAVY 82 0 82 - - - - 7 2022 NAVY 22 0 22 - - - 8 2023 NAVY 28 0 28 A - 9 2024 NAVY 74 0 74 10 2025 NAVY 79 0 79 11 2027 NAVY 86 0 86 86 1.1.2) Afterbody/Tail Cone 0 0 7 8 8 10 8 0 2 10 10 10 10 9 2 - - - - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A - - - - - - 8 9 9 9 9 9 10 8 - - 2 - - - - - - - - - 0 10 10 10 10 10 30 - - - - - - 22 - - - - - - 28 - - - - - - 74 A - 79 (2) 12 2016 NAVY 8 8 0 0 13 2017 NAVY 18 18 0 0 14 2018 NAVY 41 41 0 0 15 2019 NAVY 53 53 0 0 16 2020 NAVY 71 71 0 17 2021 NAVY 82 0 82 - - - - - - - - - - 10 10 10 10 10 10 10 10 2 18 2022 NAVY 22 0 22 - - - - - - - - - - - - - - - - - - 10 10 2 19 2023 NAVY 28 0 28 - - - - - - - - - - - - - - - - - - - - 8 20 2024 NAVY 74 0 74 A - - - - - - - - - - - - - - - 21 2025 NAVY 79 0 79 A - - - - 22 2027 NAVY (16) 0 86 86 0 55 55 55 0 55 55 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics 0 0 0 10 3 - 7 - - 74 - - 79 (7) (8) (11) 25 2022 NAVY 30 0 30 - - - - - - - - - - - - - - - - - - - - - - - - 30 26 2023 NAVY 34 0 34 - - - - - - - - - - - - - - - - - - - - - - - - 34 27 2024 NAVY 37 0 37 A - - - - - - - - - - - - - - - 37 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 358 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 28 2025 NAVY 44 0 44 29 2027 NAVY 70 0 70 3.1.4) Fuel Tank War Reserve Item Number / Title [DODIC]: 1 / MK-48 Torpedo Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G A - S E P - - 44 70 (12) 30 2021 NAVY 32 0 32 - - - - - - - - - - - - - - - 10 17 31 2022 NAVY 30 0 30 - - - - - - - - - - - - - - - - - - - 15 15 32 2023 NAVY 25 0 25 - - - - - - - - - - - - - - - - - - - - - 33 2024 NAVY 40 0 40 A - - - - - - - - - - - - - - - - - 40 34 2025 NAVY 35 0 35 A - - - - - - 35 35 2027 NAVY 70 0 70 0 0 3 3 3 16 70 O C T LI 3117 - MK-48 Torpedo Navy 5 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 359 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 8 0 0 2 2017 NAVY 18 18 0 0 3 2018 NAVY 41 41 0 0 4 2019 NAVY 53 53 0 0 5 2020 NAVY 71 71 0 6 2021 NAVY 82 52 30 10 10 10 7 2022 NAVY 22 0 22 - - - 10 10 2 8 2023 NAVY 28 0 28 - - - - - 8 9 2024 NAVY 74 0 74 - - - - - - - 10 2025 NAVY 79 0 79 - - - - - - - 11 2027 NAVY 86 0 86 1.1.2) Afterbody/Tail Cone 0 0 0 10 3 - - - - - - 7 - - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - 7 7 7 53 - - - 79 A - - - 86 (2) 12 2016 NAVY 8 8 0 0 13 2017 NAVY 18 18 0 0 14 2018 NAVY 41 41 0 0 15 2019 NAVY 53 53 0 0 16 2020 NAVY 71 71 0 0 17 2021 NAVY 82 82 0 0 18 2022 NAVY 22 22 0 19 2023 NAVY 28 21 7 - - - - - 20 2024 NAVY 74 0 74 - - - - - - - - - - - 21 2025 NAVY 79 0 79 - - - - - - - - - - - 22 2027 NAVY (16) 0 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 24 2027 NAVY 3.1.3) Warhead Electronics 0 9 - 10 10 10 10 10 10 - - - - - - 86 5 0 - - 7 7 7 7 51 A - - - - - - 86 A - - - - - 55 - - - - - 55 (7) 0 55 55 0 55 2.1.2) Afterbody/Tail Cone Section 0 7 (8) A - (11) 25 2022 NAVY 30 0 30 - - - - - - - 26 2023 NAVY 34 0 34 - - - - - - - - 27 2024 NAVY 37 0 37 - - - - - - - - O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B 9 M A R A P R M A Y 9 J U N J U L - - - 10 11 - - - - - - 11 14 - - - - - - - - A U G UNCLASSIFIED Page 22 of 30 S E P O C T N O V 0 D E C J A N F E B P-1 Line #31 0 M A R A P R M A Y J U N 3 J U L 3 A U G 3 28 S E P Volume 1 - 360 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 28 2025 NAVY 44 0 44 29 2027 NAVY 70 0 70 3.1.4) Fuel Tank War Reserve Item Number / Title [DODIC]: 1 / MK-48 Torpedo Calendar Year 2026 O C T N O V - D E C - J A N - F E B - M A R - A P R - B A L A N C E Fiscal Year 2027 M A Y - J U N - J U L - Calendar Year 2027 A U G - S E P - O C T - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G S E P - - - 44 A - - - 70 (12) 30 2021 NAVY 32 32 0 31 2022 NAVY 30 30 0 0 32 2023 NAVY 25 9 16 33 2024 NAVY 40 0 40 - - - - - - - - - - - - - - - - 16 17 34 2025 NAVY 35 0 35 - - - - - - - - - - - - - - - - - - 35 2027 NAVY 70 0 70 0 2 2 2 2 2 2 2 0 7 0 - - A O C T LI 3117 - MK-48 Torpedo Navy 2 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R 3 M A Y 3 J U N 3 J U L 3 A U G - 23 70 S E P Volume 1 - 361 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2016 NAVY 8 8 0 0 2 2017 NAVY 18 18 0 0 3 2018 NAVY 41 41 0 0 4 2019 NAVY 53 53 0 0 5 2020 NAVY 71 71 0 0 6 2021 NAVY 82 82 0 0 7 2022 NAVY 22 22 0 0 8 2023 NAVY 28 28 0 9 2024 NAVY 74 21 53 10 2025 NAVY 79 0 79 - - - - - - - - - - - 11 2027 NAVY 86 0 86 - - - - - - - - - - - 1.1.2) Afterbody/Tail Cone 0 6 6 6 6 6 6 6 6 5 0 7 7 - 7 - 7 - 7 - 7 - 7 - 6 - 6 - 6 - 6 - 6 - 0 - - 86 (2) 12 2016 NAVY 8 8 0 0 13 2017 NAVY 18 18 0 0 14 2018 NAVY 41 41 0 0 15 2019 NAVY 53 53 0 0 16 2020 NAVY 71 71 0 0 17 2021 NAVY 82 82 0 0 18 2022 NAVY 22 22 0 0 19 2023 NAVY 28 28 0 0 20 2024 NAVY 74 74 0 21 2025 NAVY 79 28 51 22 2027 NAVY (16) 0 86 - - - - - - - - - - - - - - - - - - - - 0 55 - - - - - - - - - - - - - - - - - - - - 55 0 55 - - - - - - - - - - - - - - - - - - - - 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 2.1.2) Afterbody/Tail Cone Section 24 2027 NAVY 3.1.3) Warhead Electronics 0 7 7 7 6 6 6 6 6 0 8 8 7 7 56 (7) - - - - 55 (8) 4 4 4 4 39 (11) 25 2022 NAVY 30 30 0 26 2023 NAVY 34 34 0 27 2024 NAVY 37 9 28 0 0 3 O C T LI 3117 - MK-48 Torpedo Navy 3 N O V 3 D E C 3 J A N 3 F E B 3 M A R 3 A P R 3 M A Y 4 J U N 0 J U L A U G UNCLASSIFIED Page 24 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 362 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L 28 2025 NAVY 44 0 44 - - - - - - - - - 29 2027 NAVY 70 0 70 - - - - - - - - - 3.1.4) Fuel Tank War Reserve Item Number / Title [DODIC]: 1 / MK-48 Torpedo Calendar Year 2029 A U G S E P 4 O C T 4 - N O V 4 - D E C 4 - J A N 4 - F E B 4 - M A R 4 - A P R 4 - M A Y 3 - J U N 3 - J U L 3 - A U G S E P 3 - 0 - - - - 70 (12) 30 2021 NAVY 32 32 0 0 31 2022 NAVY 30 30 0 0 32 2023 NAVY 25 25 0 0 33 2024 NAVY 40 40 0 34 2025 NAVY 35 12 23 35 2027 NAVY 70 0 70 0 3 O C T LI 3117 - MK-48 Torpedo Navy 3 3 N O V 3 D E C 3 J A N 3 F E B 3 M A R 2 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y 5 J U N 5 J U L 6 A U G 6 48 S E P Volume 1 - 363 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT 1.1.1) MOD 7 Guidance & Control (G&C) Section Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 2016 NAVY 8 8 0 0 2 2017 NAVY 18 18 0 0 3 2018 NAVY 41 41 0 0 4 2019 NAVY 53 53 0 0 5 2020 NAVY 71 71 0 0 6 2021 NAVY 82 82 0 0 7 2022 NAVY 22 22 0 0 8 2023 NAVY 28 28 0 0 9 2024 NAVY 74 74 0 0 10 2025 NAVY 79 79 0 11 2027 NAVY 86 0 86 1.1.2) Afterbody/Tail Cone 0 - - - - - - - - - 7 7 7 7 7 7 7 7 7 7 8 8 0 (2) 12 2016 NAVY 8 8 0 0 13 2017 NAVY 18 18 0 0 14 2018 NAVY 41 41 0 0 15 2019 NAVY 53 53 0 0 16 2020 NAVY 71 71 0 0 17 2021 NAVY 82 82 0 0 18 2022 NAVY 22 22 0 0 19 2023 NAVY 28 28 0 0 20 2024 NAVY 74 74 0 0 21 2025 NAVY 79 79 0 22 2027 NAVY (16) 30 56 86 2.1.1) MOD 8 Guidance & Control (G&C) Section 23 2027 NAVY 55 24 2027 NAVY 3.1.3) Warhead Electronics 7 7 7 7 7 7 7 4 4 4 4 4 5 5 5 5 5 5 5 5 5 0 (7) 0 55 55 16 39 2.1.2) Afterbody/Tail Cone Section 0 7 - 5 5 5 5 5 0 (8) 4 0 (11) 25 2022 NAVY 30 30 0 0 26 2023 NAVY 34 34 0 0 27 2024 NAVY 37 37 0 0 O C T LI 3117 - MK-48 Torpedo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 364 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT 28 2025 NAVY 44 44 0 29 2027 NAVY 70 0 70 3.1.4) Fuel Tank War Reserve Item Number / Title [DODIC]: 1 / MK-48 Torpedo Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 - - - - - - - - - 5 5 6 6 6 6 6 6 6 6 6 6 0 (12) 30 2021 NAVY 32 32 0 0 31 2022 NAVY 30 30 0 0 32 2023 NAVY 25 25 0 0 33 2024 NAVY 40 40 0 0 34 2025 NAVY 35 35 0 35 2027 NAVY 70 22 48 0 6 O C T LI 3117 - MK-48 Torpedo Navy 6 N O V 6 D E C 6 J A N 6 F E B 6 M A R 6 A P R 6 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 27 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 365 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Item Number / Title [DODIC]: 1 / MK-48 Torpedo Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 G&C Section LMS - FY16 (13) - Marion, MA 2 G&C Section LMS - FY17 Option 1 (14) - Marion, MA 3 G&C Section LMS - FY18 Option 2 (15) - Marion, MA ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 50 0 0 71 71 0 0 0 0 100 0 0 66 66 0 0 0 0 100 0 0 62 62 0 0 0 0 4 G&C Section LMS - FY19 Option 3 - Marion, MA 41 69 100 0 0 57 57 0 0 48 48 5 G&C Section LMS - FY20 Option 4 - Marion, MA 41 69 100 0 0 48 48 0 0 0 0 0 0 41 41 0 0 0 0 0 0 37 37 0 0 0 0 0 0 26 26 0 0 0 0 0 0 36 36 0 0 0 0 0 0 36 36 0 0 0 0 0 0 36 36 0 0 0 0 0 0 45 45 0 0 0 0 0 0 34 34 0 0 0 0 0 0 32 32 0 0 32 32 0 0 24 24 0 0 0 0 6 G&C Section LMS - FY21 Option 5 - Marion, MA TBD 7 G&C Section + WES + Exploder Arming Device LMS - FY22 Base Year Syracuse, NY TBD 8 G&C Section + WES + Exploder Arming Device - LMS - FY23 Option 1 Syracuse, NY TBD 9 G&C Section + WES + Exploder Arming Device - LMS - FY24 Option 2 Syracuse, NY TBD 10 G&C Section + WES + Exploder Arming Device - LMS - FY25 Option 3 Syracuse, NY TBD 11 G&C Section + WES + Exploder Arming Device - LMS - FY27 Option 5 Syracuse, NY TBD 12 Afterbody/Tail Cone Section SAIC - FY16 - Mclean, VA TBD 13 Afterbody/Tail Cone Section SAIC - FY17 - Mclean, VA TBD 14 Afterbody/Tail Cone Section SAIC - FY18 - Mclean, VA TBD 15 Afterbody/Tail Cone Section SAIC - FY19 - Mclean, VA LI 3117 - MK-48 Torpedo Navy 100 UNCLASSIFIED Page 28 of 30 P-1 Line #31 Volume 1 - 366 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Item Number / Title [DODIC]: 1 / MK-48 Torpedo Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 16 Afterbody/Tail Cone Section SAIC - FY20 - Mclean, VA 100 17 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY21 Base - Reston, VA TBD 18 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY22 Option 1 - Reston, VA TBD 19 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY23 Option 1 - Reston, VA TBD 20 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY24 Option 2 - Reston, VA TBD 21 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY25 Option 3 - Reston, VA TBD 22 Afterbody/Tail Cone Section + Fuel Tank SAIC - FY27 Option 5 - Reston, VA TBD 23 MK-48 Mod 8 TI-1 G&C Section - General Dynamic Mission Systems Manassas, VA TBD 24 Afterbody/Tail Cone Section + Fuel Tank - SAIC - Reston, VA TBD 25 WES + Exploder Arming Device - LMS - FY22 Base Syracuse, NY TBD 26 WES + Exploder Arming Device - LMS - FY23 Base Syracuse, NY TBD 27 WES + Exploder Arming Device - LMS - FY24 Option 1 - Syracuse, NY TBD 28 WES + Exploder Arming Device - LMS - FY25 Option 2 - Syracuse, NY TBD LI 3117 - MK-48 Torpedo Navy ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 25 25 0 0 0 0 0 0 33 33 0 0 0 0 0 0 26 26 0 0 0 0 0 0 28 28 0 0 0 0 0 0 28 28 0 0 0 0 0 0 26 26 0 0 0 0 0 0 26 26 0 0 0 0 0 0 30 30 0 0 0 0 0 0 26 26 0 0 15 15 0 0 39 39 0 0 26 26 0 0 42 42 0 0 0 0 0 0 36 36 0 0 0 0 0 0 36 36 0 0 0 0 UNCLASSIFIED Page 29 of 30 P-1 Line #31 Volume 1 - 367 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 P-1 Line Item Number / Title: 3117 / MK-48 Torpedo Item Number / Title [DODIC]: 1 / MK-48 Torpedo Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 29 WES + Exploder Arming Device - LMS - FY27 Option 4 - Syracuse, NY TBD 30 Fuel Tank - SAIC- FY21 Base - Reston, VA TBD 31 Fuel Tank - SAIC- FY22 Option 1 - Reston, VA TBD 32 Fuel Tank - SAIC- FY23 Option 2 - Reston, VA TBD 33 Fuel Tank - SAIC- FY24 Option 3 - Reston, VA TBD 34 Fuel Tank - SAIC- FY25 Option 4 - Reston, VA TBD 35 Fuel Tank - SAIC- FY27 Option 6 - Reston, VA TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 36 36 0 0 0 0 0 0 38 38 0 0 0 0 0 0 27 27 0 0 0 0 0 0 29 29 0 0 0 0 0 0 33 33 0 0 0 0 0 0 26 26 0 0 0 0 0 0 26 26 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (13) (14) (15) (16) MSR and EOQ have not yet been determined by the contractor. MSR and EOQ have not yet been determined by the contractor. MSR and EOQ have not yet been determined by the contractor. 6 LI 3117 - MK-48 Torpedo Navy UNCLASSIFIED Page 30 of 30 P-1 Line #31 Volume 1 - 368 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3141 / ASW Targets Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 309.271 309.271 309.271 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 30.476 38.386 47.277 0.000 47.277 49.567 53.231 54.594 - - - - - - - - 30.476 38.386 47.277 0.000 47.277 49.567 53.231 54.594 - - - - - - - - 30.476 38.386 47.277 0.000 47.277 49.567 53.231 54.594 To FY 2031 Complete 56.027 Continuing - Continuing - 56.027 Continuing - Total - Continuing - - 56.027 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The MK-39 MOD 4 Expendable Mobile ASW Training Target (EMATT) is a small self-propelled underwater vehicle launched from fixed wing and rotary wing Anti-Submarine Warfare (ASW) aircraft and ASW surface ships for the purpose of providing basic open ocean sonar training and torpedo placement exercises. Its operation consists of a dynamic run trajectory that is actively controlled in depth and course with pre-programmable run maneuvers emulating threat submarines and is detectable by all current U.S. ASW Platforms. The MK-30 is an ASW training target for Navy surface ships, submarines, and aircraft that are capable of simulating submarine threats anticipated in the twenty-first century littoral warfare environment. The MK-30 Service Life Extension Program (SLEP) extends the useful service life of MK-30 ASW Targets to meet annual fleet training requirements. The MK66 Heavyweight Undersea Training Target (HUTT) (MK-30 Replacement) is a Heavyweight Undersea Training Target to replace the MK-30 ASW Training Target for Navy surface ships, submarines, and aircrafts that are capable of simulating submarine threats anticipated in the twenty-first century undersea warfare environment. [P5 / TG002 - MK39 EMATT]: Funding under this cost code provides for the procurement of MK-39 MOD 4 EMATT vehicles and Non-Recurring Engineering (NRE). NRE funds the cost of Pre-Proof of Manufacturing (POM) units and POM units, first article testing, tooling and test equipment, procurement of technical data package updates, start-up costs, and other one-time costs for production contractors. New Sprint speed capabilities which were developed in FY20 and will be incorporated into all production MK39 Mod 4 EMATT baseline vehicles starting in FY2026, with a maximum total production capacity of 2,000 MK39 EMATTs per year. Sprint Speed upgrade allows the MK39 MOD 4 EMATT to more closely represent submarine tactics for evasion with up to 12 knot sprints. [P5 / TG003 - MK39 EMATT Upgrades]: Provides for the procurement of production MK 39 EMATT Variants to support the family of expendables needed to meet all USN ASW training requirements. Modular kits will provide additional capability to baseline units for specific training events. Low Frequency Active Expansion upgrade allows the MK39 EMATT to be compatible with future ASW sensors such as the FFG Constellation CAPTAS-4 and P-8A launched SSQ-125 Sonobuoys. The Long Endurance Variant upgrade is being developed under Phase I and II SBIRs [Alternative Power ASW Targets] which are planned to be completed late 2025. The transition to procurement of this EMATT Upgrade is planned in FY2026 and will support training operations up to 24 hours. This extended endurance allows for submarine and Maritime Patrol and Reconnaissance Aircraft (MPRA) to conduct representative missions where the prosecuting platform can tradeoff the target to fresh crews or aircraft. Very Low Frequency Projector attached to an EMATT body will allow for low frequency tonal emulations consistent with current threats for ASW training missions. The MK39 EMATT upgrade address Fleet requirements for a target to support Undersea Warfare training events by emulating real world threats. Production Support provides funding for government production and systems engineering support to support the MK39 EMATT Upgrades LI 3141 - ASW Targets Navy UNCLASSIFIED Page 1 of 16 P-1 Line #32 Volume 1 - 369 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3141 / ASW Targets Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / TG007 - MK30 SLEP]: MK 30 MOD 1 Service Life Extension Program (SLEP) extends the MK 30 MOD 1 ASW Target Service Life to continue the use of MK 30 ASW Target until FY 2027. The SLEP efforts required include the replacement of critical navigation subsystems, power distribution subsystems, mechanical parts including replacement hull sections, and test equipment that are no longer procurable and/or can no longer be maintained or that needs updates for cyber vulnerabilities. In FY 2026, MK 30 SLEP Funding is reduced to $0 to partially offset funding of the new MK 30 Replacement Target under Cost Code TG009 and start the sundowning of the MK30 SLEP. Increase in MK 30 SLEP funding in FY 2027 and beyond will support demilitarization of legacy MK30 Targets as they are removed from service and replaced with the MK66 Heavyweight Undersea Training Target (HUTT). [P5 / TG009 - MK66 Heavyweight USW Training Target (HUTT)]: Provides for the procurement of new Heavyweight USW MK-30 Replacement Target vehicles now referred to as MK66 HUTT, first article testing, tooling and test equipment, procurement of technical data package updates, start-up costs, and other one-time costs for production contractors. Funding also provides for contractor engineering services and government support by NUWC NPT for production engineering support, quality assurance efforts, and production acceptance of contractor hardware for the MK30 Replacement Target Vehicles. [P5 / TG832 - MK39 EMATT PROD ENG (IN-HOUSE)]: Funding under this cost code provides for production engineering tasks performed by NUWC NPT and KPT including EMATT program management support, systems engineering, and production engineering. [P5 / TG842 - MK39 EMATT QUALITY ASSURANCE]: Funding under this cost code provides for quality assurance efforts in support of the EMATT program. [P5 / TG862 - MK39 EMATT ACCEPTANCE T&E]: Funding under this cost code provides for production acceptance of contractor hardware for the EMATT program. [P5 / TG900 - MK39 EMATT CONSULTING SERVICES]: Funding under this cost code provides for contractor support services at the program office. LI 3141 - ASW Targets Navy UNCLASSIFIED Page 2 of 16 P-1 Line #32 Volume 1 - 370 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3141 / ASW Targets Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / ASW TARGETS P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 309.271 - / 30.476 - / 38.386 - / 47.277 - / 0.000 - / 47.277 - / 309.271 - / 30.476 - / 38.386 - / 47.277 - / 0.000 - / 47.277 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 Program Changes: TG002 (Cost Element 1.1.1 and 1.1.2) MK39 Mod 4 EMATTs - FY2027 MK39 Mod 4 Procurement quantity increased to 717 from FY2026 quantity of 522 due to changes in procurement in MK 39 Mod 3 and MK 39 Mod 4 quantity distributions, primarily due to delays on the Mod 4 production line and associated unit price delta. TG003 (Cost Element 2.1.1) Low Frequency Active Upgrade - Decrease in FY2027 funding is due to reduce in procurement quantity from 100 in FY2026 to 15 in FY2027 for the Low Frequency Active Upgrade. Reduction is due to FFG-62 program cancellation, which reduces short term demand signal for this capability. TG003 (Cost Element 2.1.2 Long Endurance Upgrade) - Decrease in FY2027 funding is due to reduction in procurement quantity from 31 in FY2026 to 25 in FY2027 for the Long Endurance Upgrade. Due to change in contractor, and production delays on MK 39 Mod 4 hardware, this effort is behind schedule and additional design work must be completed once MK 39 Mod 4 production hardware is available. TG007 (Cost Element 4.1.1) MK30 SLEP - Increase in MK 30 SLEP funding in FY 2027 and beyond for demilitarization of legacy MK30 Targets as they are removed from service and replaced with the MK66 Heavyweight Undersea Training Target (HUTT). TG009 (Cost Elements 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) - Increase in FY2027 funding is due to increase in procurement quantity from 4 MK 66 HUTT Targets in FY2026 to quantity 6 in FY2027. LI 3141 - ASW Targets Navy UNCLASSIFIED Page 3 of 16 P-1 Line #32 Volume 1 - 371 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ASW TARGETS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 30.476 38.386 47.277 0.000 47.277 - Gross/Weapon System Cost ($ in Millions) 309.271 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 309.271 Plus CY Advance Procurement ($ in Millions) - - - - - 30.476 38.386 47.277 0.000 47.277 - Total Obligation Authority ($ in Millions) 309.271 FY 2027 Total - - - - - 30.476 38.386 47.277 0.000 47.277 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - TG002 - MK39 EMATT Cost Recurring Cost 1.1.1) MK 39 Mod 3 LMS RMS - (†) (1) 1.1.2) MK39 MOD - - - - 18,015.56 450 8.107 10,450.00 72 0.752 - - - - - 717 7.643 - - - - - 717 7.643 - - - - 11.424 - - 8.353 - - 0.587 - - 0.598 - - - - - 0.598 1,000 6.993 - - - - - - - - - - - - - - - - - 127.047 - - 8.353 - - 9.446 - - 8.241 - - - - - 8.241 - - 9.983 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 9.983 - - - - - - - - - - - - - - - Subtotal: Hardware - TG002 - MK39 EMATT Cost - - 137.030 - - 8.353 - - 9.446 - - 8.241 - - - - - 8.241 - - - 100 0.500 15 0.077 - - - 15 0.077 1.1.3) ENGINEERING SERVICES/ECP 1.1.4) MK39 EMATT TARGETS OPTION 2 6,993.00 Subtotal: Recurring Cost 10,659.00 - 108.630 (†) 10,659.00 - 9,855 EMATTs 11,022.83 - Non Recurring Cost 1.2.1) NONRECURRING Hardware - TG003 - MK39 EMATT Upgrades Cost Recurring Cost 2.1.1) Low Frequency Active (†) (2) LI 3141 - ASW Targets Navy - - - 5,000.00 UNCLASSIFIED Page 4 of 16 5,100.00 P-1 Line #32 5,100.00 Volume 1 - 372 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ASW TARGETS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 2.1.2) Long (†) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Endurance Upgrade - - - - - - 32,640.00 31 1.012 33,293.00 25 0.832 - - - 33,293.00 25 0.832 2.1.3) Extremely Low Frequency Expansion - - - - - - 15,000.00 25 0.375 15,300.00 25 0.383 - - - 15,300.00 25 0.383 2.1.4) Production Support - - - - - - - - 0.376 - - 0.384 - - - - - 0.384 Subtotal: Recurring Cost - - - - - - - - 2.263 - - 1.676 - - - - - 1.676 Subtotal: Hardware - TG003 - MK39 EMATT Upgrades Cost - - - - - - - - 2.263 - - 1.676 - - - - - 1.676 (3) (†) Upgrade Hardware - TG005 - MK30 MOD 2 PROCUREMENT Cost Recurring Cost 3.1.1) MK30 MOD 2 TARGETS - - 52.759 - - - - - - - - - - - - - - - 3.1.2) ENGINEERING COSTS - - 0.750 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 53.509 - - - - - - - - - - - - - - - - - 53.509 - - - - - - - - - - - - - - - Subtotal: Hardware TG005 - MK30 MOD 2 PROCUREMENT Cost Hardware - TG007 - MK30 SLEP Cost Recurring Cost (4) - - 58.206 - - 0.300 - - 0.443 - - 2.110 - - - - - 2.110 Subtotal: Recurring Cost - - 58.206 - - 0.300 - - 0.443 - - 2.110 - - - - - 2.110 Subtotal: Hardware - TG007 - MK30 SLEP Cost - - 58.206 - - 0.300 - - 0.443 - - 2.110 - - - - - 2.110 17.130 5,761K 23.044 5,325K 31.950 - - - 5,325K 4.1.1) MK30 SLEP Hardware - TG009 - MK66 Heavyweight USW Training Target (HUTT) Cost Recurring Cost 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 5,610K 1 5.610 5,710K 3 4 6 6 31.950 (†) (5) 5.1.2) Engineering Services - - 3.428 - - 2.400 - - 0.851 - - 0.915 - - - - - 0.915 5.1.3) Production Support - - 0.434 - - 0.434 - - 0.443 - - 0.452 - - - - - 0.452 LI 3141 - ASW Targets Navy UNCLASSIFIED Page 5 of 16 P-1 Line #32 Volume 1 - 373 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ASW TARGETS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 5.1.4) Quality Assurance - - 0.264 - - 0.264 - - 0.269 - - 0.274 - - - - - 0.274 5.1.5) Acceptance Test & Evaluation - - 0.264 - - 0.264 - - 0.269 - - 0.274 - - - - - 0.274 Subtotal: Recurring Cost - - 10.000 - - 20.492 - - 24.876 - - 33.865 - - - - - 33.865 Subtotal: Hardware - TG009 - MK66 Heavyweight USW Training Target (HUTT) Cost - - 10.000 - - 20.492 - - 24.876 - - 33.865 - - - - - 33.865 Support - TG015 - MK30 SUPPORT & TEST EQUIPMENT Cost 6.1) MK30 SUPPORT & TEST EQUIPMENT - - 1.122 - - - - - - - - - - - - - - - Subtotal: Support - TG015 - MK30 SUPPORT & TEST EQUIPMENT Cost - - 1.122 - - - - - - - - - - - - - - - Support - TG832 - MK39 EMATT PROD ENG (IN-HOUSE) Cost 7.1) MK39 EMATT PROD ENG (IN-HOUSE) - - 21.748 - - 0.780 - - 0.796 - - 0.812 - - - - - 0.812 Subtotal: Support - TG832 MK39 EMATT PROD ENG (IN-HOUSE) Cost - - 21.748 - - 0.780 - - 0.796 - - 0.812 - - - - - 0.812 Support - TG835 - MK30 MOD 2 PROD ENG (IN-HOUSE) Cost 8.1) MK30 MOD 2 PROD ENG (IN-HOUSE) - - 13.118 - - - - - - - - - - - - - - - Subtotal: Support - TG835 - MK30 MOD 2 PROD ENG (IN-HOUSE) Cost - - 13.118 - - - - - - - - - - - - - - - Support - TG842 - MK39 EMATT QUALITY ASSURANCE Cost 9.1) MK39 EMATT QUALITY ASSURANCE - - 2.756 - - 0.158 - - 0.161 - - 0.164 - - - - - 0.164 Subtotal: Support - TG842 - MK39 EMATT QUALITY ASSURANCE Cost - - 2.756 - - 0.158 - - 0.161 - - 0.164 - - - - - 0.164 Support - TG862 - MK39 EMATT ACCEPTANCE T&E Cost 10.1) MK39 EMATT ACCEPTANCE T&E - - 4.092 - - 0.213 - - 0.217 - - 0.221 - - - - - 0.221 Subtotal: Support TG862 - MK39 EMATT ACCEPTANCE T&E Cost - - 4.092 - - 0.213 - - 0.217 - - 0.221 - - - - - 0.221 2.084 - - - - - - - - - - - - - - - Support - TG865 - MK30 MOD 2 ACCEPTANCE TESTING Cost 11.1) MK30 MOD 2 ACCEPTANCE TESTING LI 3141 - ASW Targets Navy - - UNCLASSIFIED Page 6 of 16 P-1 Line #32 Volume 1 - 374 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ASW TARGETS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support TG865 - MK30 MOD 2 ACCEPTANCE TESTING Cost - FY 2025 Total Cost Qty (Each) ($ M) - 2.084 Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - Support - TG900 - MK39 EMATT CONSULTING SERVICES Cost 12.1) MK39 EMATT CONSULTING SERVICES - - 5.606 - - 0.180 - - 0.184 - - 0.188 - - - - - 0.188 Subtotal: Support TG900 - MK39 EMATT CONSULTING SERVICES Cost - - 5.606 - - 0.180 - - 0.184 - - 0.188 - - - - - 0.188 Gross/Weapon System Cost - - 309.271 - - 30.476 - - 38.386 - - 47.277 - - 0.000 - - 47.277 Remarks: [Hardware/Recurring] (†) indicates the presence of a P-5a Footnotes: (1) TG002 (Cost Element 1.1.1 and 1.1.2) MK39 Mod 4 EMATTs - FY27 MK39 Mod 4 Procurement quantity increased to 717 from FY2026 quantity of 522 due to changes in procurement in MK 39 Mod 3 and MK 39 Mod 4 quantity distributions, primarily due to delays on the Mod 4 production line and associated unit price delta. (2) TG003 (Cost Element 2.1.1) Low Frequency Active Upgrade - Decrease in FY2027 funding is due to reduce in procurement quantity from 100 in FY2026 to 15 in FY2027 for the Low Frequency Active Upgrade. Reduction is due to FFG-62 program cancellation, which reduces short term demand signal for this capability. (3) TG003 (Cost Element 2.1.2 Long Endurance Upgrade) - Decrease in FY2027 funding is due to reduction in procurement quantity from 31 in FY2026 to 25 in FY2027 for the Long Endurance Upgrade. Due to change in contractor, and production delays on MK 39 Mod 4 hardware, this effort is behind schedule and additional design work must be completed once MK 39 Mod 4 production hardware is available. (4) TG007 (Cost Element 4.1.1) MK30 SLEP - Increase in MK 30 SLEP funding in FY 2027 and beyond for demilitarization of legacy MK30 Targets as they are removed from service and replaced with the MK66 Heavyweight Undersea Training Target (HUTT). (5) TG009 (Cost Elements 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) - Increase in FY2027 funding is due to increase in procurement quantity from 4 MK 66 HUTT Targets in FY2026 to quantity 6 in FY2027. LI 3141 - ASW Targets Navy UNCLASSIFIED Page 7 of 16 P-1 Line #32 Volume 1 - 375 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 O O C Cost Elements 1.1.1) MK 39 Mod 3 LMS RMS Item Number / Title [DODIC]: 1 / ASW TARGETS FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2026 Lockheed Martin / Orlando, FL C / TBD ** NO PCO ** Apr 2026 Oct 2026 450 18,015.56 Y 2017 LOCKHEED MARTIN/ SIPPICAN FY17 / Marion, MA C / FFP NUWC NEWPORT Nov 2016 Feb 2018 715 6,999.00 Y 2018 LOCKHEED MARTIN/ SIPPICAN FY18 / Marion, MA C / FFP NUWC NEWPORT Nov 2017 Jan 2019 1,017 6,925.00 Y 2019 LOCKHEED MARTIN/ SIPPICAN FY19/20 / Marion, MA C / FFP NUWC NEWPORT Jan 2019 Nov 2020 1,019 7,097.00 Y 2020 LOCKHEED MARTIN/ SIPPICAN FY19/20 / Marion, MA C / FFP NUWC NEWPORT Dec 2019 Feb 2022 964 7,273.86 Y 2021 LOCKHEED MARTIN/ SIPPICAN FY20/21 / Marion, MA C / FFP NUWC NEWPORT Dec 2020 Mar 2023 965 7,455.00 Y Qty (Each) 1.1.2) MK39 MOD EMATTs (†) 1.1.2) MK39 MOD EMATTs (†) 1.1.2) MK39 MOD EMATTs (†) 1.1.2) MK39 MOD EMATTs (†) 1.1.2) MK39 MOD EMATTs (†) 1.1.2) MK39 MOD EMATTs (†) 2022 SAAB FY22 / Cranston RI C / FFP NUWC NEWPORT Sep 2023 Dec 2025 227 8,321.00 Y 1.1.2) MK39 MOD EMATTs (†) 2023 SAAB FY23 / Cranston RI C / FFP NUWC NEWPORT Mar 2023 Dec 2025 922 8,321.00 Y 1.1.2) MK39 MOD EMATTs (†) 2024 SAAB FY24 / Cranston RI C / FFP NUWC NEWPORT Mar 2024 Sep 2026 851 8,480.00 Y 1.1.2) MK39 MOD EMATTs (†) 2026 SAAB FY26 / Cranston RI C / FFP NUWC NEWPORT Aug 2026 Apr 2028 72 10,450.00 Y 1.1.2) MK39 MOD EMATTs (†) 2027 SAAB FY27 / Cranston RI C / FFP NUWC NEWPORT Feb 2027 Apr 2029 717 10,659.00 Y 2.1.1) Low Frequency Active 2026 New MFG - TBD / TBD C / TBD NUWC NEWPORT May 2026 May 2027 100 5,000.00 Y 2.1.2) Long Endurance Upgrade 2026 New MFG - TBD / TBD C / TBD NUWC NEWPORT Oct 2025 Oct 2026 31 32,640.00 Y 2.1.3) Extremely Low Frequency Expansion Upgrade 2026 New MFG - TBD / TBD C / TBD NUWC NEWPORT May 2026 May 2027 25 15,000.00 Y 2024 SAAB / Cranston RI C / FFP NUWC NEWPORT Jun 2025 Jun 2027 1 5,610K Y 2025 SAAB / Cranston RI C / FFP NUWC NEWPORT Jun 2025 Jun 2027 3 5,710K Y 2026 SAAB / Cranston RI C / FFP NUWC NEWPORT Apr 2026 Apr 2028 4 5,761K Y 2027 SAAB / Cranston RI C / FFP NUWC NEWPORT Feb 2027 Feb 2029 6 5,325K Y 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) (†) 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) (†) 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) (†) 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) (†) (†) P-1 Line Item Number / Title: 3141 / ASW Targets (†) RFP Issue Date indicates the presence of a P-21 LI 3141 - ASW Targets Navy UNCLASSIFIED Page 8 of 16 P-1 Line #32 Volume 1 - 376 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2017 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2016 1 OCT Calendar Year 2017 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2018 M A Y J U N J U L Calendar Year 2018 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 450 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 0 715 3 2018 NAVY 1,017 0 1,017 4 2019 NAVY 1,019 0 1,019 1,019 4 2020 NAVY 964 0 964 964 5 2021 NAVY 965 0 965 965 8 2022 NAVY 227 0 227 227 7 2023 NAVY 922 0 922 922 6 2024 NAVY 851 0 851 851 9 2026 NAVY 72 0 72 72 10 2027 NAVY 717 0 717 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) A - - - - - - - - - - - - - - - 208 - - 250 - - - 257 A - - - - - - - - - - - 0 1,017 (5) 11 2024 NAVY 1 0 1 1 11 2025 NAVY 3 0 3 3 11 2026 NAVY 4 0 4 4 11 2027 NAVY 6 0 6 6 O C T LI 3141 - ASW Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 377 === page 418 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 450 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 3 2018 NAVY 1,017 0 1,017 4 2019 NAVY 1,019 0 1,019 4 2020 NAVY 964 0 964 5 2021 NAVY 965 0 965 965 8 2022 NAVY 227 0 227 227 7 2023 NAVY 922 0 922 922 6 2024 NAVY 851 0 851 851 9 2026 NAVY 72 0 72 72 10 2027 NAVY 717 0 717 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 - - - 333 A - - - - 333 - - - 351 - - - - - - - - 0 - - - - - - - - - - - - 1,019 A - - - - - - - - - - 964 (5) 11 2024 NAVY 1 0 1 1 11 2025 NAVY 3 0 3 3 11 2026 NAVY 4 0 4 4 11 2027 NAVY 6 0 6 6 O C T LI 3141 - ASW Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 378 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 450 0 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 3 2018 NAVY 1,017 1,017 0 4 2019 NAVY 1,019 0 1,019 - 333 - 333 - - - 353 4 2020 NAVY 964 0 964 - - - - - - - - - - - - - - - - 333 - - - - - 333 - 298 5 2021 NAVY 965 0 965 A - - - - - - - - - - - - - - - - - - - - - - 965 8 2022 NAVY 227 0 227 227 7 2023 NAVY 922 0 922 922 6 2024 NAVY 851 0 851 851 9 2026 NAVY 72 0 72 72 10 2027 NAVY 717 0 717 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 0 (5) 11 2024 NAVY 1 0 1 1 11 2025 NAVY 3 0 3 3 11 2026 NAVY 4 0 4 4 11 2027 NAVY 6 0 6 6 O C T LI 3141 - ASW Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 379 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 450 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 0 3 2018 NAVY 1,017 1,017 0 0 4 2019 NAVY 1,019 1,019 0 4 2020 NAVY 964 666 298 298 5 2021 NAVY 965 0 965 - 8 2022 NAVY 227 0 227 7 2023 NAVY 922 0 922 6 2024 NAVY 851 0 851 9 2026 NAVY 72 0 72 72 10 2027 NAVY 717 0 717 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 0 - - - - 321 - A - 322 - - - 322 - 0 - A - - - - - - - - - - - - - - - - - - - - 227 - - - - - - - 922 A - - - - - - - 851 (5) 11 2024 NAVY 1 0 1 1 11 2025 NAVY 3 0 3 3 11 2026 NAVY 4 0 4 4 11 2027 NAVY 6 0 6 6 O C T LI 3141 - ASW Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 380 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 A - - - - - - 450 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 0 3 2018 NAVY 1,017 1,017 0 0 4 2019 NAVY 1,019 1,019 0 0 4 2020 NAVY 964 964 0 0 5 2021 NAVY 965 965 0 8 2022 NAVY 227 0 227 - - - - - - - - - - - - - - 227 7 2023 NAVY 922 0 922 - - - - - - - - - - - - - - 173 - - 400 - - 349 6 2024 NAVY 851 0 851 - - - - - - - - - - - - - - - - - - - - - 9 2026 NAVY 72 0 72 10 2027 NAVY 717 0 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 0 0 - - 348 A - - 503 72 717 (5) 11 2024 NAVY 1 0 1 A - - - - - - - - - - - - - - - - 1 11 2025 NAVY 3 0 3 A - - - - - - - - - - - - - - - - 3 11 2026 NAVY 4 0 4 A - - - - - - 4 11 2027 NAVY 6 0 6 6 O C T LI 3141 - ASW Targets Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 381 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 450 0 450 150 - 150 - - - 150 0 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 0 3 2018 NAVY 1,017 1,017 0 0 4 2019 NAVY 1,019 1,019 0 0 4 2020 NAVY 964 964 0 0 5 2021 NAVY 965 965 0 0 8 2022 NAVY 227 227 0 0 7 2023 NAVY 922 922 0 6 2024 NAVY 851 348 503 348 - - 155 9 2026 NAVY 72 0 72 - - - - 10 2027 NAVY 717 0 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 0 - - - - - - - - - - - - - - 72 A - - - - - - - - - - - - - - - - - - - 717 (5) 11 2024 NAVY 1 0 1 - - - - - - - - 1 11 2025 NAVY 3 0 3 - - - - - - - - 3 11 2026 NAVY 4 0 4 - - - - - - - - - - - - - - - - - - 11 2027 NAVY 6 0 6 A - - - - - - - - - - - - - - O C T LI 3141 - ASW Targets Navy 0 - N O V D E C J A N F E B M A R A P R M A Y J U N 0 0 J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R 4 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 382 6 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.1.1) MK 39 Mod 3 LMS RMS 1 2026 NAVY Item Number / Title [DODIC]: 1 / ASW TARGETS Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 450 450 0 0 1.1.2) MK39 MOD EMATTs Prior Years Deliveries: 3175 2 2017 NAVY 715 715 0 0 3 2018 NAVY 1,017 1,017 0 0 4 2019 NAVY 1,019 1,019 0 0 4 2020 NAVY 964 964 0 0 5 2021 NAVY 965 965 0 0 8 2022 NAVY 227 227 0 0 7 2023 NAVY 922 922 0 0 6 2024 NAVY 851 851 0 0 9 2026 NAVY 72 72 0 10 2027 NAVY 717 0 717 5.1.1) MK66 Heavyweight Undersea Training Target (HUTT) 0 - - - - - - 328 - - 389 0 (5) 11 2024 NAVY 1 1 0 0 11 2025 NAVY 3 3 0 0 11 2026 NAVY 4 4 0 11 2027 NAVY 6 0 6 0 O C T LI 3141 - ASW Targets Navy N O V D E C J A N 6 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #32 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 383 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3141 / ASW Targets Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 1 Item Number / Title [DODIC]: 1 / ASW TARGETS Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 1 Lockheed Martin - Orlando, FL MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 6 6 0 0 0 0 2 LOCKHEED MARTIN/ SIPPICAN FY17 - Marion, MA 300 1,000 1,800 0 0 21 21 0 0 15 15 3 LOCKHEED MARTIN/ SIPPICAN FY18 - Marion, MA 300 1,000 1,800 0 0 21 21 0 0 14 14 4 LOCKHEED MARTIN/ SIPPICAN FY19/20 - Marion, MA 300 1,000 1,800 0 0 25 25 0 0 22 22 5 LOCKHEED MARTIN/ SIPPICAN FY20/21 - Marion, MA 300 1,000 1,800 0 0 27 27 0 0 22 22 6 SAAB FY24 - Cranston RI TBD 0 0 29 29 0 0 0 0 7 SAAB FY23 - Cranston RI TBD 0 0 32 32 0 0 0 0 8 SAAB FY22 - Cranston RI TBD 0 0 27 27 0 0 0 0 9 SAAB FY26 - Cranston RI TBD 0 0 19 19 0 0 0 0 10 SAAB FY27 - Cranston RI TBD 0 0 26 26 0 0 0 0 0 0 24 24 0 0 0 0 11 SAAB - Cranston RI 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3141 - ASW Targets Navy UNCLASSIFIED Page 16 of 16 P-1 Line #32 Volume 1 - 384 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 651 1,778.614 1,778.614 1,778.614 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 81.614 16.692 - - 81.614 16.692 - - 81.614 16.692 112.126 - 0.000 - 112.126 - 0.000 - 112.126 0.000 112.126 112.126 112.126 118.158 118.158 118.158 185.951 185.951 185.951 192.937 192.937 192.937 To FY 2031 Complete 196.826 Continuing Continuing 196.826 Total Continuing Continuing Continuing - Continuing - - Continuing Continuing 1.718 Continuing Continuing 196.826 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - 1.534 1.562 1.523 - 1.523 1.621 1.653 1.684 0.00 - - - - - - - - - 2,732K - - - - - - - - - Continuing Continuing Description: The MK-54 is an anti-submarine torpedo deployed from surface ships and ASW air platforms in littoral scenarios operating in shallow water acoustic and environmental conditions; effective in the presence of threat countermeasures and capable in deep water engagements. This line item procures MK-54 Mod 0 Torpedo Kits, MK-54 Mod 1 Torpedo Kits and High Altitude ASW Weapon Capability (HAAWC) Air Launch Accessory (ALA) Kits. The MK-54 Mod 0 LWT maximizes the use of Non-Developmental Item (NDI) technologies, incorporating the proven technologies from existing torpedo programs with state of the art Commercial-Off-The-Shelf (COTS) processors and is a modular upgrade to LWT Inventory. MK-54 Mod 1 builds on the MK-54 Mod 0 improvements to expand the torpedoes capability in shallow water littoral environment and also improves the torpedoes counter-countermeasure capability to allow higher effectiveness in current and future threat environments. The High Altitude Anti-Submarine Warfare Weapon Capability (HAAWC) provides the P-8A MPRA with the ability to release LWTs from high altitude to prosecute enemy submarine threats. The FY 2026 spend plan includes $16,692 thousand of discretionary and $111,821 thousand of mandatory (reconciliation) for a total of $128,513 thousand. The discretionary funds cover installations and Diminishing Manufacturing Sources. The mandatory funds cover the requirement for MK54 Mod 1 LWT Kit Procurement (50), Diminishing Manufacturing Sources, engineering services, MK-54 mod 1 installations, fleet exercise systems, HAAWC kits (28), support equipment, quality assurance, acceptance test & evaluation, production engineering, [P5 / F5104 MK-54 MOD 0]: Funding under this cost code provides for the procurement of MK-54 MOD 0 hardware kits. The MK-54 MOD 0 Kits contract includes Processor Group Assembly (PGA), Control Group Assembly (CGA), Inertial Measurements Unit (IMU), and afterbody components and cabling. The MK-54 MOD 0 Array Nose Assembly (ANA) kits contract consists of array receivers and transmitters. Both contracts were competitively awarded. Other Items funded under this Cost Code include: - Engineering Services / Engineering Change Proposals (ECPs) - Non-Recurring Engineering (NRE) funding for pre-Proof of Manufacturing (POM) units and POM units in the base year of a new contract, first article testing, tooling and test equipment, procurement of technical data package updates and startup costs for production contractors and in FY2025 NRE funding for Lightweight Torpedo Afterbody Harvesting. - Installation funding for government installation of the kits into All Up Rounds (AUR). - Diminishing Manufacturing Sources (DMS) funding for the procurement of obsolete commercial material to avoid the redesign and requalification of the electronics during the production cycle. [P5 / F5110 MK-54 MOD 1 HARDWARE]: Funding under this cost code provides for procurement of MK 54 MOD 1 hardware kits from two contractors. The MK 54 MOD 0 Kits contract provides the afterbody upgrade components, Inertial Measurement Unit (IMU) and Control Group Assembly (CGA) for the MK 54 MOD 1 Kit. The MK 54 MOD 1 Array contract provides the new 112 element array, receiver, transmitter, and Processor Group Assembly (PGA). Other items in this Cost Code include: LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 1 of 23 P-1 Line #33 Volume 1 - 385 === page 426 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A - Engineering Services / Engineering Change Proposals (ECP) funding for (1)studies, (2)plans, (3)design changes, and (4)implementation of design changes by the contractor; primarily due to obsolescence that occurs during the contract performance. - Non-Recurring Engineering (NRE) funding to produce Proof of Manufacturing (POM) units, first article testing, product improvement, tooling and test equipment, procurement of technical data package updates, and start-up costs for production contractors. - Installation funding for government installation of the kits into All Up Rounds(AUR). - Diminishing Manufacturing Sources (DMS) funding for the procurement of obsolete commercial material to avoid redesign and requalification of the electronics during the production cycle. [P5 / F5111 MK-54 MOD 2]: Funding under this Cost Code provides for the procurement of MK 54 MOD 2 Increment 1 LWT Program. The MK 54 MOD 2 Increment 1 program leverages the sonar hardware improvements developed under the MOD 1 program and improves the lethality and speed of the LWT by upgrading the Warhead and Otto Fuel afterbody to be compatible with new MOD 2 G&C system to counter challenging near-peer adversary submarines that are faster and deeper diving. Other items funded under this cost code include: - Engineering Services / Engineering Change Proposals (ECP) funding for (1) studies, (2) plans, (3) design changes, (4) implementation of design changes by the contractor; primarily due to obsolescence that occurs during the contract performance, - Production tasks performed by NUWC NPT and KPT and includes review of contractor generated Engineering Change Proposals (ECPs), review and resolution of contractor failures and proposed corrective action, configuration management activities, contractor monitoring, risk analysis, technical problem resolution, software engineering, safety, integrated logistics support, environmental engineering, information systems, test equipment, software maintenance and updates, and refurbishment of notable test equipment to provide to the contractors. Funding maintains production specification in accordance with production processes, provides subject matter experts to support root cause analysis of failed contractor hardware, and monitors contractor defect and reduction processes to ensure deficiencies are effectively addressed. - Diminishing Manufacturing Sources (DMS) funding for the procurement of obsolete commercial material to avoid redesign and requalification of the electronics during the production cycle - Installation funding for government installation into All Up Round (AUR) [P5 / F5105 FLEET EXERCISE SYSTEMS]: Funding under this cost code provides for procurement of MK 54 Fleet Exercise Sections (FES) utilized during in-water acceptance testing of MK-54 kits, fleet exercises and developmental and operational testing. [P5 / F5109 HAAWC]: Funding under this cost code provides for procurement, Engineering Change Proposals (ECPs) and non-recurring engineering of the MK-54 High Altitude ASW Weapon Capability (HAAWC) for the P-8 aircraft. HAAWC is an Air-Launched Accessory (ALA) that allows for employment of the MK 54 outside the current P-8 air launch envelope. The nonrecurring cost sub-cost element is required for redesign due to obsolescence and qualification of new products or contractors and proof of manufacturing units for first article testing, as well as product improvement, value engineering, tooling, test equipment, procurement of technical data package updates, start-up costs, and other one-time costs in the first year of the production contract. [P5 / F5003 SUPPORT EQUIPMENT]: Funding under this cost code provides for procurement and maintenance of support and test equipment at Naval Undersea Warfare Centers (NUWC) Keyport and Newport, and the contractor facility for assembly, testing, and integration. [P5 / F5830 PRODUCTION ENGINEERING IN-HOUSE]: Funding under this cost code provides for production engineering tasks performed by NUWC Newport and Keyport and includes review of contractor generated ECPs, review and resolution of contractor failures and proposed corrective action, configuration management activities, contractor monitoring, risk analysis, technical problem resolution, software engineering, safety, integrated logistics support, environmental engineering, and information systems. Funding maintains production specification in accordance with production processes and provides subject matter experts to support root cause analysis of failed contractor hardware and monitor contractor defect resolution and reduction processes to ensure deficiencies are effectively addressed. [P5 / F5840 QUALITY ASSURANCE]: Funding under this cost code provides for quality assurance tasks performed by Naval Undersea Warfare Center (NUWC) Newport and Keyport including: conducting quality assurance reviews of the contractor and subcontractors, documentation indicating contractor conformity to product performance requirements, and review of objective quality evidence. [P5 / F5860 ACCEPTANCE TEST & EVALUATION]: Funding under this cost code provides for government production acceptance test planning and conducting the production acceptance test program of contractor hardware, including in-water testing of the torpedoes on department ranges. LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 2 of 23 P-1 Line #33 Volume 1 - 386 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / F5900 PRODUCTION ENGINEERING CONTRACTOR]: Funding under this cost code provides for contractor support to the program office. LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 3 of 23 P-1 Line #33 Volume 1 - 387 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / MK-54 Torpedo Mods P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 651 / 1,778.614 - / 81.614 - / 16.692 - / 112.126 - / 0.000 - / 112.126 651 / 1,778.614 - / 81.614 - / 16.692 - / 112.126 - / 0.000 - / 112.126 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 includes 54 MK-54 Mod 1 kits (decrease from 67 in FY 2026), 20 HAAWC kits (decrease from 28 in FY 2026), Diminishing Manufacturing Sources, engineering services, MK-54 Mod 1 installations, fleet exercise systems, support equipment, quality assurance, acceptance test & evaluation, production engineering. The FY 2026 spend plan includes $16,692 thousand of discretionary and $111,821 thousand of mandatory (reconciliation) for a total of $128,513 thousand. The discretionary funds cover installations and Diminishing Manufacturing Sources. The mandatory funds cover the requirement for MK54 Mod 1 LWT Kit Procurement (50), Diminishing Manufacturing Sources, engineering services, MK-54 mod 1 installations, fleet exercise systems, HAAWC kits (28), support equipment, quality assurance, acceptance test & evaluation, production engineering, LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 4 of 23 P-1 Line #33 Volume 1 - 388 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 651 Gross/Weapon System Cost ($ in Millions) 1,778.614 Less PY Advance Procurement ($ in Millions) - - 81.614 16.692 - Net Procurement (P-1) ($ in Millions) 1,778.614 Plus CY Advance Procurement ($ in Millions) - - 81.614 16.692 - Total Obligation Authority ($ in Millions) 1,778.614 - - 81.614 16.692 FY 2027 Base FY 2027 OOC - - 112.126 FY 2027 Total - 0.000 - 112.126 - 112.126 - 0.000 - 112.126 - - 112.126 0.000 112.126 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) - 1.534 1.562 1.523 - 1.523 2,732K - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - F5104 MK-54 MOD 0 Cost Recurring Cost 1.1.1) MK-54 KITS MOD 0 (†) 399,413.51 1,584 632.671 - - - - - - - - - - - - - - - 1.1.2) MK-54 ENGINEERING SERVICES/ECPS - - 42.753 - - - - - - - - - - - - - - - 1.1.3) MK-54 INSTALLATION INTO LEGACY TORPEDOS - - 99.563 - - - - - - - - - - - - - - - 1.1.4) DIMINISHING MANUFACTURING SOURCES - - 2.624 - - - - - - - - - - - - - - - 1.1.5) MK-54 Other - - 9.826 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 787.437 - - - - - - - - - - - - - - - Non Recurring Cost 1.2.1) MK-54 NRE - - 29.625 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 29.625 - - - - - - - - - - - - - - - Subtotal: Hardware - F5104 MK-54 MOD 0 Cost - - 817.062 - - - - - - - - - - - - - - - 423 292.825 1,175K 25 29.373 - - - 1,117K 50 55.860 - - - 1,117K 50 55.860 Hardware - F5110 MK-54 MOD 1 HARDWARE Cost Recurring Cost 2.1.1) MK-54 KITS MOD 1 (†) (1) 692,257.68 LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 5 of 23 P-1 Line #33 Volume 1 - 389 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.2) DIMINISHING MANUFACTURING SOURCES - - 13.759 - - 2.528 - - - - - 2.543 - - - - - 2.543 2.1.3) MK-54 ENGINEERING SERVICES / ECPS FOR KITS - - 71.627 - - 5.309 - - - - - 5.633 - - - - - 5.633 - - 17.152 - - 6.357 - - - 99 6.138 - - - 99 6.138 - - 395.363 - - 43.567 - - - - - 70.174 - - - - - 70.174 2.1.4) MK-54 MOD 1 INSTALLATION (2) Subtotal: Recurring Cost 62,000.00 62,000.00 Non Recurring Cost 2.2.1) MK-54 NRE - - 18.414 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 18.414 - - - - - - - - - - - - - - - Subtotal: Hardware - F5110 MK-54 MOD 1 HARDWARE Cost - - 413.777 - - 43.567 - - - - - 70.174 - - - - - 70.174 0.629 - - - 0.655 - - - Hardware - F5105 FLEET EXERCISE SYSTEMS Cost Recurring Cost 4.1.1) FLEET EXERCISE SYSTEMS (†) 139,116.28 86 11.964 104,887.00 6 109,125.00 6 109,125.00 6 0.655 Subtotal: Recurring Cost - - 11.964 - - 0.629 - - - - - 0.655 - - - - - 0.655 Subtotal: Hardware F5105 FLEET EXERCISE SYSTEMS Cost - - 11.964 - - 0.629 - - - - - 0.655 - - - - - 0.655 222 22.129 - - - - - - - - - - - - - - - Hardware - F5107 MK-54/ VLA KITS Cost Recurring Cost 5.1.1) MK-54 / VLA (†) KITS 99,680.18 5.1.2) MK-54 / VLA HARDWARE OBSOLESCENCE - - 1.343 - - - - - - - - - - - - - - - 5.1.3) MK-54 / VLA INSTALLATION - - 13.308 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 36.780 - - - - - - - - - - - - - - - Subtotal: Hardware - F5107 MK-54/ VLA KITS Cost - - 36.780 - - - - - - - - - - - - - - - Hardware - F5108 VLA COMPONENTS Cost Recurring Cost LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 6 of 23 P-1 Line #33 Volume 1 - 390 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 6.1.1) VLA COMPONENT SETS 6.1.2) VLA ENGINEERING SVCS / ECPS 6.1.3) VLA CANISTERS FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2,255K 22 49.606 - - - - - - - - - - - - - - - - - 3.889 - - - - - - - - - - - - - - - 22 4.766 - - - - - - - - - - - - - - - 216,636.36 6.1.4) VLA AUR BUILDUP / INSTALLATION - - 1.527 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 59.788 - - - - - - - - - - - - - - - Subtotal: Hardware - F5108 VLA COMPONENTS Cost - - 59.788 - - - - - - - - - - - - - - - 164,840.80 201 33.133 30 14.264 - - - 20 12.618 - - - 20 12.618 180,000.00 36 6.480 - - - - - - - - - - - - - - - Hardware - F5109 HAAWC Cost Recurring Cost 7.1.1) HAAWC Kits (†) (†) 7.1.2) TM kits 475,466.67 630,900.00 630,900.00 7.1.3) HAAWC Engineering Services/ ECPs - - 8.526 - - 0.438 - - 1.692 - - 1.999 - - - - - 1.999 7.1.4) HAAWC ALA Containers - - 1.878 - - - - - - - - - - - - - - - 7.1.5) HAAWC All Up Round Containers - - 3.766 - - - - - - - - - - - - - - - 7.1.6) DIMINISHING MANUFACTURING SOURCES - - 1.428 - - 0.286 - - - - - 0.301 - - - - - 0.301 7.1.7) HAAWC IN-HOUSE PRODUCTION ENGINEERING SUPPORT - - 12.017 - - 2.606 - - - - - 5.647 - - - - - 5.647 Subtotal: Recurring Cost - - 67.228 - - 17.594 - - 1.692 - - 20.565 - - - - - 20.565 Subtotal: Hardware - F5109 HAAWC Cost - - 67.228 - - 17.594 - - 1.692 - - 20.565 - - - - - 20.565 - - - - - - - - - - - - - - Hardware - F5CA1 CONGRESSIONAL ADDS- TECHNOLOGY INSERTIONS Cost Non Recurring Cost 8.1.1) CONGRESSIONAL ADDS - - LI 3215 - MK-54 Torpedo Mods Navy - 4.400 - UNCLASSIFIED Page 7 of 23 P-1 Line #33 Volume 1 - 391 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) TECHNOLOGY INSERTIONS Subtotal: Non Recurring Cost - - 4.400 - - - - - - - - - - - - - - - Subtotal: Hardware F5CA1 CONGRESSIONAL ADDS- TECHNOLOGY INSERTIONS Cost - - 4.400 - - - - - - - - - - - - - - - Hardware - F5CA2 CONGRESSIONAL ADDS - TORPEDO TEST HARDWARE Cost Non Recurring Cost 9.1.1) CONGRESSIONAL ADDS - TORPEDO TEST HARDWARE - - 1.600 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 1.600 - - - - - - - - - - - - - - - Subtotal: Hardware F5CA2 CONGRESSIONAL ADDS - TORPEDO TEST HARDWARE Cost - - 1.600 - - - - - - - - - - - - - - - - - 4.000 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 4.000 - - - - - - - - - - - - - - - Subtotal: Hardware - F5CA3 CONGRESSIONAL ADD Cost - - 4.000 - - - - - - - - - - - - - - - Hardware - F5CA3 CONGRESSIONAL ADD Cost Non Recurring Cost 10.1.1) INTELLIGENT GRAPHICS TORPEDO TEST SET TROUBLESHOOTING MAINTENERS AID Hardware - F5CA4 CONGRESSIONAL ADDS Cost Non Recurring Cost 11.1.1) LIGHTWEIGHT TORPEDO PSU TEST EQUIPMENT MODERNIZATION - - 3.840 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 3.840 - - - - - - - - - - - - - - - LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 8 of 23 P-1 Line #33 Volume 1 - 392 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - F5CA4 CONGRESSIONAL ADDS Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) - ($) 3.840 - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - Hardware - CA5F5 CONGRESSIONAL ADD-Program Increase MK54 Torpedo Cost Non Recurring Cost 12.1.1) Program Increase MK 54 Torpedo Hardware - - - - - - - - 15.000 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - 15.000 - - - - - - - - - Subtotal: Hardware - CA5F5 CONGRESSIONAL ADDProgram Increase MK54 Torpedo Cost - - - - - - - - 15.000 - - - - - - - - - Support - F5003 SUPPORT EQUIPMENT Cost 13.1) SUPPORT EQUIPMENT - - 34.222 - - 2.030 - - - - - 2.164 - - - - - 2.164 Subtotal: Support - F5003 SUPPORT EQUIPMENT Cost - - 34.222 - - 2.030 - - - - - 2.164 - - - - - 2.164 Support - F5830 PRODUCTION ENGINEERING IN-HOUSE Cost 14.1) PRODUCTION ENGINEERING INHOUSE - - 148.858 - - 7.616 - - - - - 7.938 - - - - - 7.938 Subtotal: Support F5830 PRODUCTION ENGINEERING IN-HOUSE Cost - - 148.858 - - 7.616 - - - - - 7.938 - - - - - 7.938 - - 66.746 - - 5.092 - - - - - 5.292 - - - - - 5.292 - - 66.746 - - 5.092 - - - - - 5.292 - - - - - 5.292 Support - F5840 QUALITY ASSURANCE Cost 15.1) QUALITY ASSURANCE Subtotal: Support - F5840 QUALITY ASSURANCE Cost Support - F5860 ACCEPTANCE TEST & EVALUATION Cost 16.1) ACCEPTANCE TEST & EVALUATION - - 89.857 - - 4.306 - - - - - 4.568 - - - - - 4.568 Subtotal: Support - F5860 ACCEPTANCE TEST & EVALUATION Cost - - 89.857 - - 4.306 - - - - - 4.568 - - - - - 4.568 Support - F5900 PRODUCTION ENGINEERING CONTRACTOR Cost LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 9 of 23 P-1 Line #33 Volume 1 - 393 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 17.1) PRODUCTION ENGINEERING CONTRACTOR Subtotal: Support F5900 PRODUCTION ENGINEERING CONTRACTOR Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 15.947 - - 0.780 - - - - - 0.770 - - - - - 0.770 - - 15.947 - - 0.780 - - - - - 0.770 - - - - - 0.770 Support - WAXXX ACQUISITION WORKFORCE FUNDING - 2009 Cost 18.1) ACQUISITION WORKFORCE FUNDING - 2009 Subtotal: Support WAXXX ACQUISITION WORKFORCE FUNDING 2009 Cost - - 0.287 - - - - - - - - - - - - - - - - - 0.287 - - - - - - - - - - - - - - - Support - F5103 FIELD SUPPORT OPERATIONS Cost 19.1) MK-46 MOD 5A (SW) SLEP KITS - - 1.561 - - - - - - - - - - - - - - - Subtotal: Support F5103 FIELD SUPPORT OPERATIONS Cost - - 1.561 - - - - - - - - - - - - - - - Support - F5106 MK-54 PLATFORM INTEGRATION Cost 20.1) MK-54 PLATFORM INTEGRATION - - 0.697 - - - - - - - - - - - - - - - Subtotal: Support - F5106 MK-54 PLATFORM INTEGRATION Cost - - 0.697 - - - - - - - - - - - - - - - Gross/Weapon System Cost 2,732K 651 1,778.614 - - 81.614 - - 16.692 - - - - 0.000 - - (†) 112.126 112.126 indicates the presence of a P-5a Footnotes: (1) F5110 Item 2.1.1 - MK-54 Mod 1 LWT Kit Procurement - Overall funding for the MK-54 Mod 1 decreased due to lower procurement QTY of 50 FY 2027 as compared to QTY 67 FY 2026 (QTY 67 includes QTY 54 mandatory and cost element 12.1.1 Congressional Add of QTY 13). The MK 54 Mod 1 Kit unit cost is the combination of two contract awards for new Progeny MK54 Mod 1 Array Kit which was awarded in November 2024 which included FY 2023 - FY 2025 requirements base year and priced FY26 to FY29 Step Ladder Option pricing. The NUWC Keyport Direct Cite (DC) Raytheon MK54 Common Parts base year contract awarded in December 2024 utilizing an Not to Exceed (NTE) Un-definitized Contract Action (UCA) which included FY 2023 and FY 2024 Afterbody Common Parts kits requirements. NUWC Keyport DC Raytheon MK54 Common Parts Kits Base Year option was definitized in March 2025 and did not contain out-year options, but unit prices are currently projected to increase by 5% per to account for subsequent workforce costs higher than general inflation. NUWC Keyport is currently working with Raytheon to add Option Year 1 and Option Year 2 which would include pricing FY 2025 MK54 Common Parts procurement requirements. LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 10 of 23 P-1 Line #33 Volume 1 - 394 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods ID Code (A=Service Ready, B=Not Service Ready) : (2) Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods MDAP/MAIS Code: F5110 ITEM 2.1.4 MK 54 MOD 1 INSTALLATION: FY 2027 funding request increased to support procurement installs increasing to QTY 99 in FY 2027 verse QTY 0 in FY 2026. LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 11 of 23 P-1 Line #33 Volume 1 - 395 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 O O C Cost Elements (†) 1.1.1) MK-54 KITS - MOD 0 (†) 1.1.1) MK-54 KITS - MOD 0 (†) 1.1.1) MK-54 KITS - MOD 0 (†) 1.1.1) MK-54 KITS - MOD 0 (†) 1.1.1) MK-54 KITS - MOD 0 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 (†) 2.1.1) MK-54 KITS - MOD 1 LI 3215 - MK-54 Torpedo Mods Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2016 RAYTHEON/NORTHROP GRUMMAN. / PORTSMOUTH, RHODE ISLAND/ANNAPOLIS, MD C / FFP NAVSEA Aug 2016 Jul 2020 78 292,367.00 Y 2017 RAYTHEON/NORTHROP GRUMMAN. / PORTSMOUTH, RHODE ISLAND/ANNAPOLIS, MD C / FFP NAVSEA Aug 2017 Oct 2020 116 304,732.76 Y 2018 RAYTHEON /ULTRA / PORTSMOUTH, RI / BRAINTREE, MA C / FFP NAVSEA Aug 2018 Feb 2021 104 335,625.00 Y 2019 RAYTHEON /ULTRA / PORTSMOUTH, RI / BRAINTREE, MA C / FFP NAVSEA Jul 2019 Jul 2021 66 371,969.70 Y 2020 RAYTHEON /ULTRA / PORTSMOUTH, RI / BRAINTREE, MA C / FFP NAVSEA Jul 2020 Jul 2022 43 372,116.28 Y 2016 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON - FY16 / MANASSAS VA /PORTSMOUTH,RI SS / FFP NAVSEA Jul 2016 Nov 2018 40 525,000.00 Y 2017 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON - FY16 / MANASSAS VA /PORTSMOUTH,RI SS / FFP NAVSEA Aug 2018 Jan 2020 30 533,000.00 Y 2018 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA Aug 2018 Jan 2021 30 615,733.33 Y 2020 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA Dec 2019 Jan 2022 30 626,133.33 Y 2021 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA Dec 2020 Jan 2023 69 604,434.78 Y 2022 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA Dec 2021 Jan 2024 91 574,462.00 Y 2023 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA/ KPT Nov 2024 Dec 2026 42 1,123K Y 2024 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON - FY24 / MANASSAS VA / Portsmith RI SS / FFP NAVSEA/ KPT Nov 2024 Mar 2027 51 1,118K Y 2025 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON - FY25 / New MFG - Loc SS / FFP NAVSEA/KPT Nov 2024 Jul 2027 25 1,175K Y 2027 GENERAL DYNAMIC MISSION SYSTEMS/RAYTHEON- FY18 / MANASSAS VA / Portsmith RI Various NAVSEA/KPT Feb 2027 Mar 2029 50 1,117K Y UNCLASSIFIED Page 12 of 23 P-1 Line #33 (Each) RFP Issue Date Volume 1 - 396 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements O O C Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 4.1.1) FLEET EXERCISE SYSTEMS 2016 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Jan 2016 Jan 2017 6 89,000.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2017 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2017 Sep 2018 6 90,000.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2018 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2018 Sep 2019 2 91,666.67 Y 4.1.1) FLEET EXERCISE SYSTEMS 2019 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2019 Sep 2020 6 93,333.33 Y 4.1.1) FLEET EXERCISE SYSTEMS 2020 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2020 Sep 2021 6 95,000.00 Y 2020 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2020 Sep 2021 6 0.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2021 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2021 Sep 2022 6 96,900.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2022 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2022 Sep 2023 6 98,838.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2023 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2023 Sep 2024 6 100,815.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2024 NUWC KEYPORT / KEYPORT WASHINGTON C / FFP NUWC, KPT Sep 2024 Sep 2025 6 102,831.10 Y 4.1.1) FLEET EXERCISE SYSTEMS 2025 NUWC KEYPORT / KEYPORT WASHINGTON C / TBD NUWC,KPT Sep 2025 Sep 2026 6 104,887.00 Y 4.1.1) FLEET EXERCISE SYSTEMS 2027 NUWC KEYPORT / KEYPORT WASHINGTON C / TBD NUWC, KPT Sep 2027 Sep 2028 6 109,125.00 Y 5.1.1) MK-54 / VLA KITS 2016 LOCKHEED MARTIN / OWEGO NY SS / FP NAVSUP, WSS Jul 2016 Nov 2017 32 48,968.75 Y 5.1.1) MK-54 / VLA KITS 2017 LOCKHEED MARTIN / AKRON OH SS / FFP NAVSUP,WSS Jul 2017 Nov 2018 40 49,750.00 Y (†) 2019 BOEING INC FY19 / ST LOUIS, MO SS / FP NAVSEA Jan 2019 Jul 2021 117 52,012.00 Y (†) 2020 BOEING INC FY20 / ST LOUIS, MO SS / FFP NAVSEA Aug 2022 Sep 2024 20 576,800.00 Y (†) 2023 BOEING INC FY19 / ST LOUIS, MO SS / FFP NAVSEA Jun 2023 Dec 2025 24 416,375.00 Y (†) 2024 BOEING INC FY24 / ST LOUIS, MO SS / FFP NAVSEA Jun 2025 May 2027 27 475,481.48 Y (†) 2025 BOEING INC FY25 / ST LOUIS, MO SS / FFP NAVSEA Jun 2025 Aug 2027 30 475,466.67 Y (†) 7.1.1) HAAWC Kits 2027 BOEING INC FY27 / ST LOUIS, MO SS / FFP NAVSEA Apr 2027 Apr 2029 20 630,900.00 Y 7.1.2) TM kits 2019 FY19 BOEING INC. / ST LOUIS, MO C / FFP NAVSEA Nov 2019 Nov 2020 36 180,000.00 Y 4.1.1) FLEET EXERCISE SYSTEMS ✓ 7.1.1) HAAWC Kits 7.1.1) HAAWC Kits 7.1.1) HAAWC Kits 7.1.1) HAAWC Kits 7.1.1) HAAWC Kits (†) P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods (Each) RFP Issue Date indicates the presence of a P-21 LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 13 of 23 P-1 Line #33 Volume 1 - 397 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 LI 3215 - MK-54 Torpedo Mods Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods UNCLASSIFIED Page 14 of 23 Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods P-1 Line #33 Volume 1 - 398 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 0 78 2 2017 NAVY 116 0 116 1 2018 NAVY 104 0 104 104 1 2019 NAVY 66 0 66 66 1 2020 NAVY 43 0 43 43 2.1.1) MK-54 KITS - MOD 1 A - - - - - - - - - - - - - - 78 A - - 116 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 0 40 3 2017 NAVY 30 0 30 A - - - - - - - - - - - - - - - 40 30 4 2018 NAVY 30 0 30 30 4 2020 NAVY 30 0 30 30 4 2021 NAVY 69 0 69 69 4 2022 NAVY 91 0 91 91 4 2023 NAVY 42 0 42 42 5 2024 NAVY 51 0 51 51 6 2025 NAVY 25 0 25 25 4 2027 NAVY 50 0 50 50 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 0 117 117 8 2020 NAVY 20 0 20 20 7 2023 NAVY 24 0 24 24 10 2024 NAVY 27 0 27 27 11 2025 NAVY 30 0 30 30 9 NAVY 20 0 20 2027 20 O C T LI 3215 - MK-54 Torpedo Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 399 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 0 78 - - - - - - - - - - - - - - - - - - - - - - - - 78 2 2017 NAVY 116 0 116 - - - - - - - - - - - - - - - - - - - - - - - - 116 1 2018 NAVY 104 0 104 A - - - - - - - - - - - - - - 104 1 2019 NAVY 66 0 66 A - - - 66 1 2020 NAVY 43 0 43 2.1.1) MK-54 KITS - MOD 1 43 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 0 40 - - - 3 2017 NAVY 30 0 30 - - - - - - - - - - A - - - - 4 - 4 - 4 - 4 - 4 - 4 - 4 - 4 - 4 - 4 - 30 0 4 2018 NAVY 30 0 30 A - - - - - - - - - - - - - - 30 4 2020 NAVY 30 0 30 30 4 2021 NAVY 69 0 69 69 4 2022 NAVY 91 0 91 91 4 2023 NAVY 42 0 42 42 5 2024 NAVY 51 0 51 51 6 2025 NAVY 25 0 25 25 4 2027 NAVY 50 0 50 50 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 0 117 8 2020 NAVY 20 0 20 20 7 2023 NAVY 24 0 24 24 10 2024 NAVY 27 0 27 27 11 2025 NAVY 30 0 30 30 9 NAVY 20 0 20 2027 A - - - - - - - - 117 20 O C T LI 3215 - MK-54 Torpedo Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 400 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 0 78 - - - - - - - - - 20 30 28 2 2017 NAVY 116 0 116 - - - - - - - - - - - - 30 30 28 28 1 2018 NAVY 104 0 104 - - - - - - - - - - - - - - - - 1 2019 NAVY 66 0 66 - - - - - - - - - - - - - - - - - - - - - 1 2020 NAVY 43 0 43 A - - - - - - - - - - - - 2.1.1) MK-54 KITS - MOD 1 0 0 9 9 9 9 9 9 10 4 4 - - 9 31 5 53 - 43 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 3 2017 NAVY 30 0 30 - - - 0 4 2018 NAVY 30 0 30 - - - - - - - - - - - - - - - 4 2020 NAVY 30 0 30 A - - - - - - - - - - - - - - - - - - - - 4 2021 NAVY 69 0 69 A - - - - - - - - 4 2022 NAVY 91 0 91 91 4 2023 NAVY 42 0 42 42 5 2024 NAVY 51 0 51 51 6 2025 NAVY 25 0 25 25 4 2027 NAVY 50 0 50 50 2 2 3 3 3 3 3 3 - 3 3 2 0 2 2 2 3 3 3 3 3 - 9 - - 30 - - 69 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 0 117 8 2020 NAVY 20 0 20 20 7 2023 NAVY 24 0 24 24 10 2024 NAVY 27 0 27 27 11 2025 NAVY 30 0 30 30 9 NAVY 20 0 20 2027 - - - - - - - - - - - - - - - - - - - - 14 15 15 73 20 O C T LI 3215 - MK-54 Torpedo Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 401 === page 442 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 78 0 2 2017 NAVY 116 116 0 1 2018 NAVY 104 73 31 8 8 8 7 1 2019 NAVY 66 13 53 5 6 6 6 1 2020 NAVY 43 0 43 2.1.1) MK-54 KITS - MOD 1 0 0 - - - 0 6 - 6 - 6 - 6 - 6 - 0 - 2 2 6 5 5 5 5 5 4 4 0 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 3 2017 NAVY 30 30 0 0 4 2018 NAVY 30 21 9 4 2020 NAVY 30 0 30 - - - 4 2021 NAVY 69 0 69 - - - - - - - - - - - - - - - 4 2022 NAVY 91 0 91 A - - - - - - - - - - - - - 4 2023 NAVY 42 0 42 42 5 2024 NAVY 51 0 51 51 6 2025 NAVY 25 0 25 25 4 2027 NAVY 50 0 50 50 0 3 3 3 0 2 2 2 3 3 - 3 3 3 3 3 3 0 6 6 - 6 - 6 - 6 - 6 - 6 - 6 - 7 - - 14 91 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 44 73 8 2020 NAVY 20 0 20 7 15 15 15 15 13 0 A - - - - - - - - - - - - - - 20 A - - - - 24 2023 NAVY 24 0 24 10 2024 NAVY 27 0 27 27 11 2025 NAVY 30 0 30 30 9 NAVY 20 0 20 2027 20 O C T LI 3215 - MK-54 Torpedo Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 402 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 78 0 0 2 2017 NAVY 116 116 0 0 1 2018 NAVY 104 104 0 0 1 2019 NAVY 66 66 0 0 1 2020 NAVY 43 43 0 0 2.1.1) MK-54 KITS - MOD 1 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 0 3 2017 NAVY 30 30 0 0 4 2018 NAVY 30 30 0 0 4 2020 NAVY 30 30 0 4 2021 NAVY 69 55 14 - 4 2022 NAVY 91 0 91 - 4 2023 NAVY 42 0 42 A - - - - - - - - - - - 42 5 2024 NAVY 51 0 51 A - - - - - - - - - - - 51 6 2025 NAVY 25 0 25 A - - - - - - - - - - - 25 4 2027 NAVY 50 0 50 0 7 7 - 0 - 8 8 8 8 8 8 8 8 9 4 5 9 0 50 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 117 0 8 2020 NAVY 20 0 20 - - - - - - - - - - - 20 7 2023 NAVY 24 0 24 - - - - - - - - - - - - 10 2024 NAVY 27 0 11 2025 NAVY 30 0 9 NAVY 20 0 20 2027 0 - - - - 24 27 A - - - - 27 30 A - - - - 30 - - - - - - - 20 O C T LI 3215 - MK-54 Torpedo Mods Navy 0 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 403 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 78 0 0 2 2017 NAVY 116 116 0 0 1 2018 NAVY 104 104 0 0 1 2019 NAVY 66 66 0 0 1 2020 NAVY 43 43 0 0 2.1.1) MK-54 KITS - MOD 1 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 0 3 2017 NAVY 30 30 0 0 4 2018 NAVY 30 30 0 0 4 2020 NAVY 30 30 0 0 4 2021 NAVY 69 69 0 0 4 2022 NAVY 91 91 0 4 2023 NAVY 42 0 42 - - - - - - - - - - - - - - 14 14 14 5 2024 NAVY 51 0 51 - - - - - - - - - - - - - - - - - 14 14 14 6 2025 NAVY 25 0 25 - - - - - - - - - - - - - - - - - - - - - 4 2027 NAVY 50 0 50 A - - - - - 0 0 9 0 4 4 - 6 - - 11 50 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 117 0 8 2020 NAVY 20 20 0 7 2023 NAVY 24 0 24 - - 24 10 2024 NAVY 27 0 27 - - - - - - - - - - - - - - - - - - - 15 - - 12 11 2025 NAVY 30 0 30 - - - - - - - - - - - - - - - - - - - - - - 6 9 NAVY 20 0 20 2027 0 0 A O C T LI 3215 - MK-54 Torpedo Mods Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L 0 A U G - 24 - 20 S E P Volume 1 - 404 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 78 0 0 2 2017 NAVY 116 116 0 0 1 2018 NAVY 104 104 0 0 1 2019 NAVY 66 66 0 0 1 2020 NAVY 43 43 0 0 2.1.1) MK-54 KITS - MOD 1 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 0 3 2017 NAVY 30 30 0 0 4 2018 NAVY 30 30 0 0 4 2020 NAVY 30 30 0 0 4 2021 NAVY 69 69 0 0 4 2022 NAVY 91 91 0 0 4 2023 NAVY 42 42 0 0 5 2024 NAVY 51 51 0 6 2025 NAVY 25 14 11 4 2027 NAVY 50 0 50 0 6 5 - 0 - - - - - - - - - - - - - - - - 4 4 4 4 4 4 5 21 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 117 0 0 8 2020 NAVY 20 20 0 0 7 2023 NAVY 24 24 0 0 10 2024 NAVY 27 27 0 11 2025 NAVY 30 6 24 - 21 - 9 NAVY 20 0 20 - - - 2027 0 O C T LI 3215 - MK-54 Torpedo Mods Navy N O V D E C 3 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R 20 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 405 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) MK-54 KITS - MOD 0 Prior Years Deliveries: 1177 2 2016 NAVY 78 78 0 0 2 2017 NAVY 116 116 0 0 1 2018 NAVY 104 104 0 0 1 2019 NAVY 66 66 0 0 1 2020 NAVY 43 43 0 0 2.1.1) MK-54 KITS - MOD 1 (1) Prior Years Deliveries: 40 3 2016 NAVY 40 40 0 0 3 2017 NAVY 30 30 0 0 4 2018 NAVY 30 30 0 0 4 2020 NAVY 30 30 0 0 4 2021 NAVY 69 69 0 0 4 2022 NAVY 91 91 0 0 4 2023 NAVY 42 42 0 0 5 2024 NAVY 51 51 0 0 6 2025 NAVY 25 25 0 4 2027 NAVY 50 29 21 0 5 4 4 4 4 0 7.1.1) HAAWC Kits Prior Years Deliveries: 13 7 2019 NAVY 117 117 0 0 8 2020 NAVY 20 20 0 0 7 2023 NAVY 24 24 0 0 10 2024 NAVY 27 27 0 0 11 2025 NAVY 30 30 0 0 9 NAVY 20 20 0 2027 0 O C T LI 3215 - MK-54 Torpedo Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 406 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3215 / MK-54 Torpedo Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Item Number / Title [DODIC]: 1 / MK-54 Torpedo Mods Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 RAYTHEON /ULTRA - PORTSMOUTH, RI / BRAINTREE, MA 120 216 312 0 0 21 21 0 0 24 24 2 RAYTHEON/NORTHROP GRUMMAN. PORTSMOUTH, RHODE ISLAND/ANNAPOLIS, MD 120 216 312 0 0 28 28 0 0 24 24 0 0 28 28 0 0 17 17 0 0 29 29 0 0 25 25 0 0 28 28 0 0 24 24 0 0 31 31 0 0 0 0 0 0 30 30 0 0 9 9 0 0 25 25 0 0 9 9 0 0 24 24 0 0 0 0 0 0 23 23 0 0 0 0 0 0 26 26 0 0 0 0 3 GENERAL DYNAMIC MISSION SYSTEMS/ RAYTHEON - FY16 - MANASSAS VA / PORTSMOUTH,RI 4 GENERAL DYNAMIC MISSION SYSTEMS/ RAYTHEON- FY18 MANASSAS VA / Portsmith RI TBD 24 51 200 5 GENERAL DYNAMIC MISSION SYSTEMS/ RAYTHEON - FY24 MANASSAS VA / Portsmith RI TBD 6 GENERAL DYNAMIC MISSION SYSTEMS/ RAYTHEON - FY25 - New MFG - Loc TBD 7 BOEING INC FY19 - ST LOUIS, MO TBD 8 BOEING INC FY20 - ST LOUIS, MO TBD 9 BOEING INC FY27 - ST LOUIS, MO TBD 10 BOEING INC FY24 - ST LOUIS, MO TBD 11 BOEING INC FY25 - ST LOUIS, MO TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3215 - MK-54 Torpedo Mods Navy UNCLASSIFIED Page 23 of 23 P-1 Line #33 Volume 1 - 407 === page 448 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 408 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 58 1,427.205 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,427.205 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,427.205 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 17.363 31.479 67.279 0.000 67.279 75.896 90.465 - - - - - - - 17.363 31.479 67.279 0.000 67.279 75.896 90.465 - - - - - - - 17.363 31.479 67.279 0.000 67.279 75.896 90.465 242.548 242.548 242.548 To FY 2031 Complete 261.810 Continuing Continuing 261.810 Continuing - Continuing 261.810 Total Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 0.862 - - - - - - - - 0.00 - - - - - - - - - - 24,607K - - - - - - - - - Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) Continuing 0.862 Continuing Description: The CBASS torpedo kit consists of three major components: Guidance & Control Box (GCB), a Broadband Sonar Analog Receiver (BSAR), and preamplifier. Procurement of GCB continues from Mods in production since FY 2002 and procurement of the BSAR began in FY 2004. The BSAR is a CBASS specific item, which consists of a preamplifier, receiver, and interfacing hardware that provides the capability to transmit and receive over a wide frequency band; taking advantage of broadband signal processing techniques. This provides for improvements in advanced threat countermeasures (CMs) capabilities. MK 48 Mod 8 Guidance & (G&C) Section upgrade, which will supply a new G&C section, including new Sonar Assembly (higher density array, transmitter, receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition to the G&C section, the Mod 8 upgrade will also feature a new Warhead Electronics System (WES) to support improved fusing and the Improved Post Launch Communications System (IPLCS), which will replace the existing copper guidance wire with fiber optics. Improvements are needed in the presence of advanced countermeasures, shallow water, low Doppler targets, Very Shallow Water (VSW), improved fusing and Anti Surface Warfare (ASuW) performance. The FY 2026 spend plan includes $31,479 thousand of discretionary and $28,760 thousand of mandatory (reconciliation) for a total of $60,231 thousand. The mandatory funds supports heavyweight torpedo production to procure extended range kits. [P5 / D1001 Hardware]: Funding under this cost code provides for the procurement of CBASS hardware kits from the contractor. - Engineering Services / Engineering Change Proposals (ECP) funding for (1)studies, (2)plans, (3)design changes, and (4)implementation of design changes by the contractor; primarily due to obsolescence that occurs during the contract performance. - Non-Recurring Engineering (NRE) funding to resolve production issues, including obsolescence. Non-Recurring Engineering (NRE) funds the procurement of Proof of Manufacturing (POM) units for government testing, first article testing, tooling and test equipment, procurement of technical data package updates, and start-up costs for the production contract. - Installation funding for government installation of kits procured in prior years. The installation includes required upgrades to convert the MK 48 MOD 6 Torpedo into a MK 48 MOD 7 Torpedo. The pre-amp, guidance control box, EMI filter, and Broadband Sonar Analog Receiver (BSAR) are installed at the government Intermediate Maintenance Activity. - Diminishing Manufacturing Sources (DMS) funds are provided to procure electronic parts, which are declared obsolete by the original equipment manufacturing. This is done to avoid the cost of an expensive redesign in the CBASS kit during execution of the production contract. The contractor will be required to procure, deliver, and store the MK 48 Mod 7 DMS material for these obsolete components. [P5 / D1002 - MK 48 MOD 8 Hardware]: This cost code provides for the procurement of the MK 48 MOD 8 Guidance & Control (G&C) Section upgrade, which will supply a new G&C section, including new Sonar Assembly (higher density array, transmitter, receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition to the G&C section, the MOD 8 upgrade will also feature LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 1 of 15 P-1 Line #34 Volume 1 - 409 === page 450 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A a new Warhead Electronics System (WES) to support improved fuzing and the Improved Post Launch Communications System (IPLCS), which will replace the existing copper guidance wire with fiber optics. Improvements are needed in the presence of advanced countermeasures, shallow water, low Doppler targets, Very Shallow Water (VSW), improved fuzing and Anti Surface Warfare (ASuW) performance. MK 48 MOD 8 upgrade allows full fleet introduction of the APB-6 and to meet requirements of MK 48 Improvements CDD (857-97-12). Other Items in this Cost Code include: -Engineering services / Engineering Change Proposals (ECPs) funding for (1)studies, (2)plans, (3)design changes, and (4)implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. - Diminishing Manufacturing Sources (DMS) funds are provided to procure electronic parts, which are declared obsolete by the original equipment manufacturing. This is done to avoid the cost of an expensive redesign in the MK 48 MOD 8 kit during execution of the production contract. The contractor will be required to procure, deliver, and store the MK 48 MOD 8 DMS material for these obsolete components. [P5 / D1004 - MK48 MOD 9 Afterbody Tail cone (ABTC) Section Upgrade]: MK48 Mod 9 Technology Insertion TI-2 represents significant improvements to the MK 48 MOD 7 and MOD 8 heavyweight torpedo (HWT) including propulsion upgrades providing extended range and advance sensing capabilities against surface and subsurface targets. MK 48 MOD 8 (TI-1) and MK 48 MOD 9 (TI-2) provide two distinctly different capabilities and are operationally intended for different mission sets. The MK48 Mod 9 ABTC Technology Insertion 2 (TI-2) hardware upgrades, which provides advanced sensing, processing, and propulsion technologies were developed under OSW SCO, and ONR FNC research and development programs and are transitioning to Production starting FY30 and out. [P5 / D1005 - MK48 Extended Range Otto Fuel Upgrade]: Funding under this cost code provides an upgrade to the MK 48 HWT Otto fuel variants with a significant range increase. Improvements include engine combustion improvements upgrades and larger fuel tank to increase standoff distances and provides an increase increase on-ship survivability. This effort is in addition to current Afterbody procurements and builds. [P5 / D1003 - Support and Ancillary Equipment]: Funding under this cost code provides procurement and maintenance of support and test equipment at Naval Undersea Warfare Centers (NUWC) Keyport and the contractor facility for assembly, testing, and integration. [P5 / D1830 - Production Engineering (Contractor & In-House)]: Funding under this cost code provides for production tasks performed by NUWC NPT and KPT and includes review of contractor generated Engineering Change Proposals (ECP), review and resolution of contractor failures and proposed corrective action, configuration management activities, contractor monitoring, risk analysis, technical problem resolution, software engineering, safety, integrated logistics support, environmental engineering, and information systems. Funding maintains production specification in accordance with production processes, provides subject matter experts to support root cause analysis of failed contractor hardware, and monitor contractor defect reduction processes to ensure deficiencies are effectively addressed. Funding is also provided for program office acquisition support. [P5 / D1840 - Quality Assurance]: Funding under this cost code provides for quality assurance (QA) tasks performed by NUWC DIV KPT and NPT including: QA review of the contractor and subcontractor's data, review of the documentation indicating conformity to product performance requirements, and review of objective quality evidence. [P5 / D1860 - Acceptance T&E (Contractor & In-House)]: Funding under this cost code provides for Government production acceptance testing of contractor hardware. [P5 / D1CA1 - Obsolescence]: Funding under this cost code provides for production engineering tasks associated with MK-48 hardware obsolescence. [P5 / D1CA2 - Tech Insert]: Funding under this cost code provides for production engineering tasks associated with a technology refresh for the MK-48 sonar array and signal processor cards. [P5 / D1CA3 - ASW Enhancements]: Funding under this cost code provides for production engineering tasks associated with a technology refresh for the MK-48 sonar array. LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 2 of 15 P-1 Line #34 Volume 1 - 410 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / MK-48 Torpedo ADCAP Mods P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 58 / 1,427.205 - / 17.363 - / 31.479 - / 67.279 - / 0.000 - / 67.279 58 / 1,427.205 - / 17.363 - / 31.479 - / 67.279 - / 0.000 - / 67.279 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Justification: The FY2027 budget request for BLI 3225 MK48 ADCAP Mods WPN includes $67,279K of discretionary funding and procurement quantity of 14 MK48 Mod 8 TI-1 Kits with improved fusing and the Improved Post Launch Communications System (IPLCS), contractor engineering support, quantity of 40 MK48 Extended Range Fuel Tank Otto Fuel Upgrades which provides MK48 HWT with a significant range increase, procurement and maintenance of support and test equipment at Naval Undersea Warfare Centers (NUWC) Keyport and the contractor facility for assembly, testing, and integration, production engineering support, quality assurance, and acceptance test and evaluation support. FY 2027 Program Changes: ITEM 1.1.4 D1001 CBASS Installation: All CBASS Upgrade kits procured from prior years will have been completed in FY 2026. $0 budgeted in FY 2027 ITEM 2.1: D1002 MK48 MOD 8 TI-1 G&C Hardware Cost - FY2027 provides funding for a new budget cost code line in the amount of $25,951 thousand for the procurement of a quantity of 14 MK 48 MOD 8 Guidance & Control (G&C) Section upgrade Kits. The MK 48 MOD 8 Guidance & Control (G&C) Section upgrade Kits will supply a new G&C section, including new Sonar Assembly (higher density array, transmitter, receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition to the G&C section, the MOD 8 upgrade will also feature a new Warhead Electronics System (WES) to support improved fusing and the Improved Post Launch Communications System (IPLCS), which will replace the existing copper guidance wire with fiber optics. ITEM 2.2: D1002 - MK48 MOD 8 Engineering services / Engineering Change Proposals (ECPs): FY2027 provides funding in the amount of $4,394 thousand for this new budget cost code line to provide funding for Contractor Engineering Service Technical Instructions in order to fund Contractor: (1)studies, (2)plans, (3)design changes, and (4)implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. ITEM 4.1: D1005 MK48 Extended Range Otto Fuel Upgrade: FY2027 provides funding for a new budget cost code line in the amount of $10,712 thousand for the procurement of upgrades to the MK48 HWT Otto fuel variants to extend the current MK48 Fuel Tanks which provides for a significant range increase. Improvements include engine combustion improvements upgrades and a larger fuel tank to increase standoff distances and provides an increase on-ship survivability. This effort is in addition to current Afterbody procurements and Fuel Tank builds. ITEM 5.1: D1003 Support Equipment: Funding decreases from $17,864 thousand in FY 2026 to $12,596 thousand in FY 2027 for the procurement MK48 Mod 8 G&C Exploder Test Set Unique Test Equipment due to less Test Set Obsolescence components being procured in FY 2027 for Test Set upgrades to support testing MOD 8 Kits. The test sets upgrade require up to three years to procure and build and need to be ordered at least a year before the production procurement to support testing of the production units. FY2025 Reconciliation Funding: The FY2025 BLI 3225 MK48 ADCAP Mods Reconciliation WPN funding is $28,760 thousand for the Proof of Manufacturing (POM units) to support the testing and qualification efforts associated with FY2027 and out procurement of MK48 Extended Range Otto Fuel Tank Upgrade fuel variants. LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 3 of 15 P-1 Line #34 Volume 1 - 411 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 17.363 31.479 67.279 0.000 67.279 58 Gross/Weapon System Cost ($ in Millions) 1,427.205 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,427.205 Plus CY Advance Procurement ($ in Millions) - - - - - 17.363 31.479 67.279 0.000 67.279 - Total Obligation Authority ($ in Millions) 1,427.205 FY 2027 Total - - - - - 17.363 31.479 67.279 0.000 67.279 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) 24,607K - 0.862 - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - D1001 Hardware Cost Recurring Cost 1.1.1) ADCAP Mod Kits - 228.988 - - - - - - - - - - - - - - - 1,149 329.827 - - - - - - - - - - - - - - - - - 55.859 - - 1.154 - - - - - - - - - - - - - - 68.157 - - 1.386 - - 0.257 - - - - - - - - - 1.1.5) Diminishing Manufacturing Sources - - 2.138 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 684.969 - - 2.540 - - 0.257 - - - - - - - - - (†) 1.1.2) CBASS Kits 1.1.3) CBASS Engineering Services/ ECPs 1.1.4) CBASS Installation (1) 287,055.70 Non Recurring Cost 1.2.1) CBASS NRE - - 72.935 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 72.935 - - - - - - - - - - - - - - - Subtotal: Hardware - D1001 Hardware Cost - - 757.904 - - 2.540 - - 0.257 - - - - - - - - - - - - - - - 1,854K 14 25.951 - - - 1,854K 14 25.951 Hardware - D1002 - MK 48 MOD 8 Hardware Cost Recurring Cost 2.1.1) MK 48 Mod 8 (†) (2) G&C Kit - - LI 3225 - MK-48 Torpedo ADCAP Mods Navy - UNCLASSIFIED Page 4 of 15 P-1 Line #34 Volume 1 - 412 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.1.2) Engineering Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 4.394 - - - - - 4.394 Subtotal: Recurring Cost - - - - - - - - - - - 30.345 - - - - - 30.345 Subtotal: Hardware - D1002 - MK 48 MOD 8 Hardware Cost - - - - - - - - - - - 30.345 - - - - - 30.345 40 10.712 - - - 40 10.712 Services/ECPs (3) Hardware - D1005 - MK48 Extended Range Otto Fuel Upgrade Cost Recurring Cost 4.1.1) MK48 Extended Range Otto Fuel - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - 10.712 - - - - - 10.712 Subtotal: Hardware - D1005 - MK48 Extended Range Otto Fuel Upgrade Cost - - - - - - - - - - - 10.712 - - - - - 10.712 (†) (4) Upgrade 267,800.00 267,800.00 Support - D1003 - Support and Ancillary Equipment Cost 5.1) Support & Ancillary Equipment (5) Subtotal: Support - D1003 - Support and Ancillary Equipment Cost - - 64.744 - - 1.726 - - 17.864 - - 12.596 - - - - - 12.596 - - 64.744 - - 1.726 - - 17.864 - - 12.596 - - - - - 12.596 Support - D1830 - Production Engineering (Contractor & In-House) Cost 6.1) Production Enginnering (Contractor & In-House) - - 335.634 - - 6.861 - - 6.998 - - 7.138 - - - - - 7.138 Subtotal: Support - D1830 - Production Engineering (Contractor & In-House) Cost - - 335.634 - - 6.861 - - 6.998 - - 7.138 - - - - - 7.138 Support - D1840 - Quality Assurance Cost 7.1) Quality Assurance (In-House) - - 43.604 - - 3.121 - - 3.183 - - 3.247 - - - - - 3.247 Subtotal: Support - D1840 Quality Assurance Cost - - 43.604 - - 3.121 - - 3.183 - - 3.247 - - - - - 3.247 Support - D1860 - Acceptance T&E (Contractor & In-House) Cost 8.1) Acceptance T&E (Contractor & In-House) - - 206.219 - - 3.115 - - 3.177 - - 3.241 - - - - - 3.241 Subtotal: Support - D1860 Acceptance T&E (Contractor & In-House) Cost - - 206.219 - - 3.115 - - 3.177 - - 3.241 - - - - - 3.241 LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 5 of 15 P-1 Line #34 Volume 1 - 413 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - D1CA1 - Obsolescence Cost 9.1) Obsolescence - - 10.000 - - - - - - - - - - - - - - - - - 10.000 - - - - - - - - - - - - - - - 10.1) Tech Insertion - - 2.700 - - - - - - - - - - - - - - - Subtotal: Support - D1CA2 Tech Insert Cost - - 2.700 - - - - - - - - - - - - - - - - - 6.400 - - - - - - - - - - - - - - - - - 6.400 - - - - - - - - - - - - - - - 1,427.205 - - 17.363 - - 31.479 - - 67.279 - - 0.000 - - 67.279 Subtotal: Support - D1CA1 Obsolescence Cost Support - D1CA2 - Tech Insert Cost Support - D1CA3 - ASW Enhancements Cost 11.1) ASW Enhancements Subtotal: Support - D1CA3 ASW Enhancements Cost Gross/Weapon System Cost (†) 24,607K 58 indicates the presence of a P-5a Footnotes: (1) (2) ITEM 1.1.4 D1001 CBASS Installation: All CBASS Upgrade kits procured from prior years will have been completed in FY2026. $0 budgeted in FY27 Item 2.1.1: D1002 MK 48 Mod 8 G&C Kits: FY 2027 provides funding for a new budget cost code line in the amount of $25,951K for the procurement of a quantity of 14 MK 48 MOD 8 Guidance & Control (G&C) Section upgrade Kits. The MK 48 MOD 8 Guidance & Control (G&C) Section upgrade Kits will supply a new G&C section, including new Sonar Assembly (higher density array, transmitter, receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition to the G&C section, the MOD 8 upgrade will also feature a new Warhead Electronics System (WES) to support improved fuzing and the Improved Post Launch Communications System (IPLCS), which will replace the existing copper guidance wire with fiber optics. (3) Item 2.1.2: D1002 Engineering Services/ECP's: FY2027 provides funding for a new budget cost code line in the amount of $4,394K for engineering services/ECPs for studies, plans, design changes, and implementation of by the contractors due to obsolescence to support the procurement of a quantity of 14 MK 48 MOD 8 Guidance & Control (G&C) Section upgrade Kits. (4) ITEM 4.1.1: D1005 MK48 Extended Range Otto Fuel Upgrade: FY 2027 provides funding for a new budget cost code line in the amount of $10,712K for the procurement of upgrades to the MK 48 HWT Otto fuel variants to extend the current MK48 Fuel Tanks which provides for a significant range increase. Improvements include engine combustion improvements upgrades and a larger fuel tank to increase standoff distances and provides an increase on-ship survivability. This effort is in addition to current Afterbody procurements and Fuel Tank builds. (5) ITEM 5.1 D1003 Support Equipment: Funding decreases from $17,864K in FY 2026 to $12,596K in FY 2027 for the procurement MK48 Mod 8 G&C Exploder Test Set Unique Test Equipment due to less Test Set Obsolescence components being procured in FY 2027 for Test Set upgrades to support testing MOD 8 Kits, the test sets upgrade require up to three years, to procure and build and need to be ordered at least a year before the production procurement to support testing of the production units. LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 6 of 15 P-1 Line #34 Volume 1 - 414 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 O O C Cost Elements 1.1.2) CBASS Kits (†) 1.1.2) CBASS Kits (†) 1.1.2) CBASS Kits (†) 1.1.2) CBASS Kits (†) 1.1.2) CBASS Kits (†) (†) 2.1.1) MK 48 Mod 8 G&C Kit 4.1.1) MK48 Extended Range Otto (†) Fuel Upgrade (†) P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2018 LOCKHEED MARTIN/SIPPICAN FY18 Option / Marion, MA C / FFP NAVSEA Aug 2018 Jul 2021 53 204,193.00 Y 2019 LOCKHEED MARTIN/SIPPICAN FY19 Option / Marion, MA C / FFP NAVSEA Jun 2019 Jul 2022 79 205,964.00 Y 2020 LOCKHEED MARTIN/SIPPICAN FY20 Option / Marion, MA C / FFP NAVSEA Sep 2020 Jun 2023 54 231,462.96 Y 2021 LOCKHEED MARTIN SIPPICAN / FY21 Option / Marion, MA C / FFP NAVSEA Nov 2021 Jun 2024 34 346,558.82 Y 2022 LOCKHEED MARTIN SIPPICAN / FY22 Base Year / Marion, MA SS / FFP NAVSEA Dec 2022 Dec 2025 4 655,250.00 Y 2027 Progeny- FY27 / Manassas C / FFP NAVSEA May 2027 Nov 2029 14 1,854K Y 2027 SAIC FY27 / Reston, VA C / FPIF NAVSEA Apr 2027 Jun 2029 40 267,800.00 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 7 of 15 P-1 Line #34 Volume 1 - 415 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N Calendar Year 2019 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 0 53 2 2019 NAVY 79 0 79 3 2020 NAVY 54 0 54 54 4 2021 NAVY 34 0 34 34 5 2022 NAVY 4 0 4 4 14 0 14 14 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY 2027 NAVY - - - - - - - - - - - - - 53 A - - - - 79 (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 A - 40 0 (4) 40 40 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 416 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 0 53 - - - - - - - - - - - - - - - - - - - - - 2 2019 NAVY 79 0 79 - - - - - - - - - - - - - - - - - - - - - - - - 79 3 2020 NAVY 54 0 54 A - - - - - - - - - - - - - 54 4 2021 NAVY 34 0 34 34 5 2022 NAVY 4 0 4 4 14 0 14 14 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY 2027 NAVY 9 9 32 (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 3 40 0 (4) 40 40 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 417 === page 458 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 21 32 2 2019 NAVY 79 0 79 - - - - - - - - - 3 2020 NAVY 54 0 54 - - - - - - - - - - - - - - 4 2021 NAVY 34 0 34 A - - - - - - - - - - - - - 5 2022 NAVY 4 0 4 14 0 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY 2027 NAVY 3 3 4 4 4 3 4 4 0 8 8 8 7 6 6 6 6 6 6 6 6 0 - - - - - - 1 1 1 1 50 - - - - - - - - - - 34 A - - - - - - - - - - 4 (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 3 40 0 14 14 (4) 40 40 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 418 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 53 0 2 2019 NAVY 79 79 0 3 2020 NAVY 54 4 50 4 2021 NAVY 34 0 34 - - - - - - - - 5 2022 NAVY 4 0 4 - - - - - - - - 14 0 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY 2027 NAVY 0 6 6 6 6 6 6 7 7 0 3 3 - 3 - 3 - 3 - 3 - 3 - 3 - 3 - 3 - 4 - 0 - - - - - - 4 (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 0 40 0 14 14 (4) 40 40 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 419 === page 460 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 53 0 0 2 2019 NAVY 79 79 0 0 3 2020 NAVY 54 54 0 0 4 2021 NAVY 34 34 0 5 2022 NAVY 4 0 4 14 0 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY 2027 NAVY - 1 1 1 1 0 (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 0 - 40 0 14 A - - - - - 14 - 40 (4) 40 A O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 420 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 53 0 0 2 2019 NAVY 79 79 0 0 3 2020 NAVY 54 54 0 0 4 2021 NAVY 34 34 0 0 5 2022 NAVY 4 4 0 0 14 0 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 2027 NAVY 40 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 (4) 40 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y 3 J U N 3 J U L 3 A U G 3 28 S E P Volume 1 - 421 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.2) CBASS Kits Prior Years Deliveries: 925 1 2018 NAVY 53 53 0 0 2 2019 NAVY 79 79 0 0 3 2020 NAVY 54 54 0 0 4 2021 NAVY 34 34 0 0 5 2022 NAVY 4 4 0 0 14 0 2.1.1) MK 48 Mod 8 G&C Kit 6 2027 NAVY (2) 4.1.1) MK48 Extended Range Otto Fuel Upgrade 7 2027 NAVY 40 12 14 - 2 2 1 1 1 1 1 1 1 1 1 1 0 (4) 28 3 O C T LI 3225 - MK-48 Torpedo ADCAP Mods Navy 3 N O V 3 D E C 3 J A N 4 F E B 4 M A R 4 A P R 4 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 422 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3225 / MK-48 Torpedo ADCAP Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Item Number / Title [DODIC]: 1 / MK-48 Torpedo ADCAP Mods Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 LOCKHEED MARTIN/ SIPPICAN FY18 Option Marion, MA 30 50 90 0 0 35 35 0 0 35 35 2 LOCKHEED MARTIN/ SIPPICAN FY19 Option Marion, MA 30 50 90 0 0 37 37 0 0 37 37 3 LOCKHEED MARTIN/ SIPPICAN FY20 Option Marion, MA 30 50 70 0 0 33 33 0 0 33 33 0 0 31 31 0 0 31 31 0 0 36 36 0 0 33 33 0 0 30 30 0 0 0 0 0 0 26 26 0 0 0 0 4 LOCKHEED MARTIN SIPPICAN / FY21 Option Marion, MA TBD 5 LOCKHEED MARTIN SIPPICAN / FY22 Base Year - Marion, MA TBD 6 Progeny- FY27 - Manassas TBD 7 SAIC FY27 - Reston, VA 40 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3225 - MK-48 Torpedo ADCAP Mods Navy UNCLASSIFIED Page 15 of 15 P-1 Line #34 Volume 1 - 423 === page 464 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 424 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3231 / Maritime Mines Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 156.993 156.993 156.993 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 100.022 100.022 100.022 0.000 0.000 0.000 251.724 - 0.000 - 251.724 - 0.000 - 251.724 0.000 251.724 251.724 251.724 243.073 243.073 243.073 244.972 244.972 244.972 241.528 241.528 241.528 To FY 2031 Complete 245.101 245.101 245.101 Total - 1,483.413 - 1,483.413 - - - 1,483.413 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.442 0.258 - - - - - - - - 1.700 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This funding procures all naval mines used for sea denial anti-surface ship or anti-submarine subsurface weapons. The Naval mining capability consists of the Mk 67 Submarine Launched Mobile Mine (SLMM), in sustainment only, the MK 68 Clandestine Delivered Mine (CDM), QS family of mines, and the Hammerhead Encapsulated Effector. The Mk 68 CDM uses existing Mk 67 SLMM components to provide a mine delivered by unmanned maritime platforms or surface vessels. The CDM program uses an incremental approach to improve capability and to align with delivery platform availability. MOD 0 replicated the Mk 67 SLMM capability. MOD 1 provides a security enhancement and incorporates the Target Detecting Device (TDD) Mk 71. MOD 2 incorporates additional security enhancements and a new explosive fill. Mine Launching System development starts in FY 2027. QS is a family of shallow water, aircraft laid mines used against surface and subsurface targets. The QS Family of Mines (QS-FOM) has 3 variants based on size - the Mk 62, Mk 63, and Mk 65. The Mk 62 and Mk 63 (500 lb. and 1000 lb., respectively) QS are created by adding mine hardware to the Mk 82 and MK 83 general purpose bombs. The Mk 65 (2400 lb.) QS consists entirely of hardware designed for use as a mine. The MOD 0, 1, and 3 variants utilize various (TDDs). The QS MOD 3 utilizes a TDD Mk 71, which is a software-programmable device capable of being programmed to optimize detection of new threats. For the QS Mk 62 and 63, the QS MOD 3 Kit consists of the TDD Mk 71, a future Safe and Arming device, MK 176 battery, Mk 163 TDD Adapter Ring, and miscellaneous hardware. For the QS Mk 65, the MOD 3 Kit consists of the TDD Mk 71, the existing S&A device, existing batteries (Mk 131 or 132), Mk 157 TDD Adapter, and miscellaneous hardware. Additional support hardware for the QS MK 62/63/65 MOD 3 includes a variety of maintenance and programming test sets to maintain mine operational readiness. The Quickstrike-Extended Range (QS-ER) Mine is the newest member of the QS family that is being developed to deliver capabilities required by a Joint Emergent Operational Need Statement (JEONS). This includes adding GPS-enabled tail kit and a wing kit to the QS series to reduce risk to the delivery aircraft by enabling precision mine placement and mid-range standoff delivery. The Hammerhead Encapsulated Effector is a moored-torpedo variant mine system uses the existing MK 54 lightweight torpedo as the effector to engage enemy targets within a wide area of coverage per each weapon. The system consists of a capsule module, a mooring module, a sensor module, and organic sensing, command, control, and signal processing. The system uses modern sensing and processing technology to enable accurate targeting at increased range and maintains minefield resilience even as weapons are expended against targets. Additional efforts include transitioning an encapsulation system with different end effectors. The FY 2026 spend plan for Maritime Mines includes $0.000 of discretionary and $507.6M of mandatory (reconciliation) for a total of $507.562M. The mandatory funds consist of Quickstrike Mine, Hammerhead Encapsulated Effector, Quickstrike Extended Range, and Clandestine Delivered Mine. LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 1 of 17 P-1 Line #35 Volume 1 - 425 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 2: Mod of Torpedoes and Related Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3231 / Maritime Mines Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Quickstrike Mine - / 101.450 - / 5.942 - / 0.000 / 8.270 - / 0.000 P-5 2 / Encapsulated Effector P-5a, P-21 - / 28.453 - / 46.857 - / 0.000 - / 169.114 - / 0.000 - / 169.114 P-5 3 / Quickstrike Extended Range P-5a, P-21 - / 25.890 - / 24.923 - / 0.000 - / 21.713 - / 0.000 - / 21.713 P-5 4 / Clandestine Delivered Mine (CDM) - / 1.200 - / 22.300 - / 0.000 - / 52.627 - / 0.000 - / 52.627 P-40 Total Gross/Weapon System Cost / 156.993 - / 100.022 - / 0.000 - / 251.724 - / 0.000 - / 251.724 - - - / 8.270 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 1) Quickstrike Mine (QS): FY 2027 funding supports QS MOD 3 hardware procurements of Mk 71 Target Detection Devices (TDD), Test Set Maintenance and Programming, and associated components to maintain Mine Systems Operational readiness. Unit costs are based on step ladder pricing negotiated in QS MOD 3 contracts. QS increase from 2026 to 2027 is due to component procurements for the repair/ upgrade and modernization of 2 Test sets. 2) Encapsulated Effector: FY 2027 funding supports the procurement of Encapsulated Effector Systems associated engineering and support equipment for the deployment inventory objective requirements. Encapsulated Effector funding and procurement quantities increased FY2027-FY2031 to meet INDOPACOM requirements and get closer to maximum production quantity. 3) Quickstrike Extended Range (QS-ER): FY 2027 funding supports continued procurement of primary hardware (wing kits, bomb bodies, tail kits) associated engineering and support equipment (loading adapter) for inventory objective requirements. Unit costs are based on the technical advisory report (TAR) and rate recommendations from DCMA. 4) Clandestine Delivered Mine (CDM) FY 2027 funding supports the hardware procurement of MK 68 MOD 1 mines and associated components, Multi Mission Buoys (MMB) and associated hardware components and system shipping containers. Procurement of MOD 2 mines will commence in FY 2028. LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 2 of 17 P-1 Line #35 Volume 1 - 426 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Quickstrike Mine MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.942 0.000 8.270 0.000 8.270 - Gross/Weapon System Cost ($ in Millions) 101.450 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 101.450 Plus CY Advance Procurement ($ in Millions) - - - - - 5.942 0.000 8.270 0.000 8.270 - Total Obligation Authority ($ in Millions) 101.450 FY 2027 Total - - - - - 5.942 0.000 8.270 0.000 8.270 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) TDD MK-71 (1) 111,195.65 1.1.2) Support Equipment - 368 40.920 - - 0.000 - - 0.000 - 7.687 - - 1.895 - - 0.000 23,682.80 186 4.405 - - 0.000 - - 0.000 - - 0.000 23,682.80 186 4.405 - - 0.000 1.1.3) MK-65 Mod Kit 30,595.74 188 5.752 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) MK-62/63 Mod Kit 18,566.67 1,200 22.280 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Clandestine Delivered Mine (CDM) - - 3.264 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) Production ECP (HW/SW) - - 2.126 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) Misc Test Set Repair Components - - 0.000 - - 0.850 - - 0.000 - - 2.573 - - 0.000 - - 2.573 Subtotal: Recurring Cost - - 82.029 - - 2.745 - - 0.000 - - 6.978 - - 0.000 - - 6.978 - - 82.029 - - 2.745 - - 0.000 - - 6.978 - - 0.000 - - 6.978 2.1) Production Engineering - - 17.232 - - 3.197 - - 0.000 - - 0.646 - - 0.000 - - 0.646 2.2) Integrated Logistics Support Subtotal: Hardware Cost Support Cost - - 2.189 - - 0.000 - - 0.000 - - 0.646 - - 0.000 - - 0.646 Subtotal: Support Cost - - 19.421 - - 3.197 - - 0.000 - - 1.292 - - 0.000 - - 1.292 Gross/Weapon System Cost - - 101.450 - - 5.942 - - 0.000 - - 8.270 - - 0.000 - - 8.270 LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 3 of 17 P-1 Line #35 Volume 1 - 427 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 P-1 Line Item Number / Title: 3231 / Maritime Mines ID Code (A=Service Ready, B=Not Service Ready) : Remarks: [Hardware/Recurring] FY 2027 funding supports QS component procurement for repair/ upgrade of mine test sets. Item Number / Title [DODIC]: 1 / Quickstrike Mine MDAP/MAIS Code: Footnotes: (1) FY 2027 funding supports the procurement of MK 71 TDD Test Set Maintenance and Programming to maintain the mine systems operational readiness. The increase from FY 2026 to FY 2027 for QS Component acquisition for Repair/Upgrade and Modernization of 2 additional Test Sets. If repairs and upgrades are not made, Mines cannot be readied for deployment; impacting Mine Readiness of Naval Fleet Forces. The quantity increase of TDD procurements is based upon the new contract which will be in place in FY26. LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 4 of 17 P-1 Line #35 Volume 1 - 428 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Encapsulated Effector MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - - 28.453 46.857 0.000 - - - 28.453 46.857 0.000 - - - 28.453 46.857 0.000 FY 2027 Base FY 2027 OOC - - 169.114 FY 2027 Total - 0.000 - 169.114 - 169.114 - 0.000 - 169.114 - 169.114 - 0.000 169.114 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Primary 1,481K 14 20.734 1,496K 23 34.410 - - 0.000 1,496K 100 149.616 - - 0.000 1,496K 100 149.616 1.1.2) Payload - - 6.130 - - 10.603 - - 0.000 - - 14.320 - - 0.000 - - 14.320 1.1.4) Support Equipment - - 0.831 - - 1.442 - - 0.000 - - 4.029 - - 0.000 - - 4.029 - - 27.695 - - 46.455 - - 0.000 - - 167.965 - - 0.000 - - 167.965 - - 27.695 - - 46.455 - - 0.000 - - 167.965 - - 0.000 - - 167.965 2.1) Production Support - - 0.593 - - 0.194 - - 0.000 - - 0.585 - - 0.000 - - 0.585 2.2) Integrated Logistics Support Hardware (†) (2) Subtotal: Recurring Cost Subtotal: Hardware Cost Support Cost - - 0.165 - - 0.208 - - 0.000 - - 0.564 - - 0.000 - - 0.564 Subtotal: Support Cost - - 0.758 - - 0.402 - - 0.000 - - 1.149 - - 0.000 - - 1.149 Gross/Weapon System Cost - - 28.453 - - 46.857 - - 0.000 - - 169.114 - - 0.000 - - 169.114 Remarks: [Hardware/Recurring] FY2027 funding supports the procurement of Encapsulated Effector Systems, payload, associated engineering, and support equipment to support the deployment inventory objective requirements. Unit costs are based on pricing negotiated in the GDMS Contract awarded in June 2024. [Support Cost] "A" in the Delivery Schedule indicates the Contract Award Date. LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 5 of 17 P-1 Line #35 Volume 1 - 429 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 P-1 Line Item Number / Title: 3231 / Maritime Mines ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Encapsulated Effector MDAP/MAIS Code: Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (5) Lead time between award and delivery is 12 months (†) indicates the presence of a P-5a Footnotes: (2) Increase in quantity resulted from an increased demand signal from United States Indo-Pacific Command (INDOPACOM) for mines in support of maritime operations LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 6 of 17 P-1 Line #35 Volume 1 - 430 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (†) 1.1.1) Primary Hardware (†) 1.1.1) Primary Hardware (†) 1.1.1) Primary Hardware (†) O O C FY P-1 Line Item Number / Title: 3231 / Maritime Mines Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Encapsulated Effector Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2024 (3) GENERAL DYNAMICS MISSION SYSTEMS / TAUNTON, MA C / CPFF NAVSEA Jun 2024 Mar 2026 14 1,481K N 2025 (4) GENERAL DYNAMICS MISSION SYSTEMS / TAUNTON, MA C / FPIF NAVSEA Jan 2026 Nov 2027 23 1,496K Y GENERAL DYNAMICS MISSION SYSTEMS / TAUNTON, MA C / TBD ** NO PCO ** Oct 2026 Dec 2027 100 1,496K N 2027 RFP Issue Date Jul 2024 indicates the presence of a P-21 Footnotes: (3) (4) Contract No. N00024-21C6425 Contract No. N00024-21C6425 LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 7 of 17 P-1 Line #35 Volume 1 - 431 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Primary Hardware PROC QTY Item Number / Title [DODIC]: 2 / Encapsulated Effector Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2024 NAVY (5) 0 14 1 2025 NAVY 23 0 23 23 1 2027 NAVY 100 0 100 100 14 A - O C T LI 3231 - Maritime Mines Navy N O V D E C J A N F E B M A R A P R M A Y J U N - J U L - A U G UNCLASSIFIED Page 8 of 17 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #35 - M A R - A P R - M A Y - J U N - J U L - A U G - 14 S E P Volume 1 - 432 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Primary Hardware PROC QTY Item Number / Title [DODIC]: 2 / Encapsulated Effector Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2024 NAVY (5) 0 14 1 2025 NAVY 23 0 23 1 2027 NAVY 100 0 100 14 - - - - A - - 2 - - - - - 3 3 - 3 - 3 - 0 - - - A O C T LI 3231 - Maritime Mines Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 17 S E P O C T - N O V - D E C - J A N - F E B P-1 Line #35 - M A R - A P R - M A Y - J U N - J U L A U G - 23 - 100 S E P Volume 1 - 433 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Primary Hardware PROC QTY Item Number / Title [DODIC]: 2 / Encapsulated Effector Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2024 NAVY (5) 14 0 1 2025 NAVY 23 0 23 - 1 2027 NAVY 100 0 100 - 14 0 O C T LI 3231 - Maritime Mines Navy 3 N O V D E C - - - 5 10 5 14 14 14 14 14 14 J A N F E B M A R A P R M A Y 0 14 J U N 2 J U L 0 A U G UNCLASSIFIED Page 10 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #35 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 434 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 P-1 Line Item Number / Title: 3231 / Maritime Mines Item Number / Title [DODIC]: 2 / Encapsulated Effector Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 GENERAL DYNAMICS MISSION SYSTEMS TAUNTON, MA 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 12 Total After Oct 1 ALT Prior to Oct 1 12 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (5) Lead time between award and delivery is 12 months. LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 11 of 17 P-1 Line #35 Volume 1 - 435 0 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Quickstrike Extended Range MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 25.890 24.923 0.000 21.713 0.000 21.713 - - - - - - 25.890 24.923 0.000 21.713 0.000 21.713 - - - - - - 25.890 24.923 0.000 21.713 0.000 21.713 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Primary Hardware (†) 170,820.00 100 17.082 0.361 175,270.00 100 17.527 - - 0.000 - - 0.361 - - 0.000 222,978.00 75 16.723 - - 0.000 - - 0.831 - - 0.000 222,978.00 75 16.723 - - 0.831 1.1.2) Payload ECP - - 1.1.3) Support Equipment - - 7.224 - - 5.782 - - 0.000 - - 2.905 - - 0.000 - - 2.905 - - 24.667 - - 23.670 - - 0.000 - - 20.459 - - 0.000 - - 20.459 - - 24.667 - - 23.670 - - 0.000 - - 20.459 - - 0.000 - - 20.459 2.1) Production Support - - 1.043 - - 1.067 - - 0.000 - - 1.074 - - 0.000 - - 1.074 2.2) Integrated Logistics Support Subtotal: Recurring Cost Subtotal: Hardware Cost Support Cost - - 0.180 - - 0.186 - - 0.000 - - 0.180 - - 0.000 - - 0.180 Subtotal: Support Cost - - 1.223 - - 1.253 - - 0.000 - - 1.254 - - 0.000 - - 1.254 Gross/Weapon System Cost - - 25.890 - - 24.923 - - 0.000 - - 21.713 - - 0.000 - - 21.713 Remarks: [Hardware/Recurring] FY 2027 funding supports continued QS-ER procurement of primary hardware (wing kits, bomb bodies), associated engineering and support equipment (tail kit, loading adapter) for inventory objective requirements. (†) indicates the presence of a P-5a LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 12 of 17 P-1 Line #35 Volume 1 - 436 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (†) 1.1.1) Primary Hardware (†) 1.1.1) Primary Hardware (†) 1.1.1) Primary Hardware (†) O O C FY P-1 Line Item Number / Title: 3231 / Maritime Mines Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 3 / Quickstrike Extended Range Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) C / FFP Washington D.C. Oct 2024 Oct 2025 100 170,820.00 Y Qty (Each) 2024 (6) BOEING INC / ST LOUIS, MO 2025 (7) BOEING INC / ST LOUIS, MO C / FFP Washington D.C. Oct 2024 Oct 2025 100 175,270.00 Y BOEING INC / ST LOUIS, MO C / TBD ** NO PCO ** Oct 2026 Oct 2027 75 222,978.00 Y 2027 RFP Issue Date indicates the presence of a P-21 Footnotes: (6) (7) Contract No. TBD Contract No. TBD LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 13 of 17 P-1 Line #35 Volume 1 - 437 === page 478 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Quickstrike Extended Range Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT O C T Fiscal Year 2026 Calendar Year 2025 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Primary Hardware 1 2024 NAVY 100 0 100 A - - - - - - - - - - - - 10 10 10 10 10 10 10 10 10 10 1 2025 NAVY 100 0 100 A - - - - - - - - - - - - 10 10 10 10 10 10 10 10 10 10 1 2027 NAVY 75 0 75 0 75 O C T LI 3231 - Maritime Mines Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #35 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 438 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Quickstrike Extended Range Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Primary Hardware 1 2024 NAVY 100 100 0 1 2025 NAVY 100 100 0 1 2027 NAVY 75 0 75 0 0 A O C T LI 3231 - Maritime Mines Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 17 S E P 10 O C T 10 N O V 10 D E C 10 J A N 10 F E B P-1 Line #35 10 M A R 10 A P R 5 M A Y 0 J U N J U L A U G S E P Volume 1 - 439 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 P-1 Line Item Number / Title: 3231 / Maritime Mines Item Number / Title [DODIC]: 3 / Quickstrike Extended Range Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 BOEING INC - ST LOUIS, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 12 Total After Oct 1 ALT Prior to Oct 1 12 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 12 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 16 of 17 P-1 Line #35 Volume 1 - 440 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3231 / Maritime Mines Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / Clandestine Delivered Mine (CDM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.200 22.300 0.000 52.627 0.000 52.627 - - - - - - 1.200 22.300 0.000 52.627 0.000 52.627 - - - - - - 1.200 22.300 0.000 52.627 0.000 52.627 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) MK 68 MOD 1 CDM and MMB containers - - 0.000 - - 1.200 1.1.3) Mulit-Mission Buoy (MMB) - - 0.000 196,000.00 1.1.4) MK68 MOD 1/2 CDM Kits - - 0.000 33,880.00 Subtotal: Recurring Cost - - 1.200 - Subtotal: Hardware Cost - - 1.200 - Gross/Weapon System Cost - - 1.200 - 1.1.2) Internal Components (8) 169,000.00 - 50 8.450 - - 0.000 17,826.00 200 3.565 - - 0.000 - 5.100 - - 0.000 - 4.290 - - 0.000 36 7.056 - - 0.000 201,233.00 60 12.074 - - 0.000 50 1.694 - - 0.000 - 22.300 - - 0.000 159,500.00 - 205 32.698 - - 0.000 - 52.627 - - 0.000 - - 22.300 - - 0.000 - - 52.627 - - 0.000 - 22.300 - - 0.000 - - 52.627 - - 0.000 - 17,826.00 200 3.565 - 4.290 201,233.00 60 12.074 159,500.00 205 32.698 - 52.627 - - 52.627 - - 52.627 - Remarks: [Hardware] FY 2026 and 2027 funding supports the increased quantities for CDM. Footnotes: (8) $3.7M is for the RDER Surface Delivery Launch System LI 3231 - Maritime Mines Navy UNCLASSIFIED Page 17 of 17 P-1 Line #35 Volume 1 - 441 === page 482 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 442 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 3: Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,122.672 1,122.672 1,122.672 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 145.655 145.655 145.655 153.418 153.418 153.418 160.445 - 0.000 - 160.445 - 0.000 - 160.445 0.000 160.445 160.445 160.445 173.466 173.466 173.466 165.967 165.967 165.967 158.196 158.196 158.196 To FY 2031 Complete 161.409 Continuing 161.409 161.409 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Torpedo Support Equipment account procures various 4T material and associated torpedo components required to maintain weapons for Surface Ships, Submarines, Fixed Wing, and Rotary Wing to achieve a posture sufficient to provide Anti-Submarine Warfare (ASW) and Anti-Surface Warfare (ASUW) readiness. This line also supports fleet exercise weapons for conducting training maneuvers and maintaining warshot inventories in an operational ready-for-issue (RFI) status in support of combat ready deployment by ASW forces. After a torpedo is fired during a training exercise, it is recovered and all expendable components such as batteries, cables, and igniters (as well as various accessories required for air-launched torpedoes) must be replaced. These items, as well as components such as exercise heads, fuel tanks, and exhaust valves may be used more than one time, but they are worn out in service and are procured each fiscal year in quantities dependent upon the fleet training requirements and tempo of operations. The torpedoes requiring support are the MK 46 MOD 5A(SW), MK 48 MODs 6 (legacy and ACOT), MK 48 MOD 7, MK 54 MOD 0/1, and the Vertical Launch Anti-Submarine (VLA) Rocket. [P5 / F8001 - LWT SUPPORT EQUIPMENT]: LIGHTWEIGHT (LWT) Support Equipment procures 4T components to support: (1) Exercise torpedo builds for Fleet Proficiency Surface Command Course and Tactical Development firings (2) Warshot torpedo maintenance to sustain the fleet with an inventory of RFI warshot torpedoes as they come due for maintenance (3) Assembly of new production MK-54 Warshots (4) Vertical Launch Anti-Submarine Rocket (ASROC) (VLA) Warshot and Exercise missile assemblies (5) Various air launch frame assemblies to support Fleet loadout. LWT 4T Components include the following: seawater batteries, pressure cylinders, thermal batteries, fuel shutoff valves, gas generator assemblies, igniters, containers, lanyard start assemblies, electrical initiators, suspension bands, VLA assembly kits, and propeller baffles. [P5 / F8002 LIGHTWEIGHT OTHER EQUIPMENT INVESTMENT]: Procures, installs, and supports Engineering Change Proposal/Ordnance Alteration (ECP/ORDALT) material required for support and test equipment and to retrofit torpedoes and 4T components to the latest RFI configuration. [P5 / F8830 LIGHTWEIGHT PRODUCTION ENGINEERING - IN HOUSE]: Provides for production support services at Naval Undersea Warfare Center (NUWC) Divisions Keyport/Newport (KPT/NPT) including program planning, funds management, budgeting, data management, acquisition engineering, software management, Integrated Logistiscs Support (ILS) and Government-Furnished Equipment (GFE) management, training equipment and configuration management. LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 1 of 38 P-1 Line #36 Volume 1 - 443 === page 484 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 3: Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / F8840 - LIGHTWEIGHT QUALITY ASSURANCE]: Provides material costs associated with failure analysis and site investigations for torpedo system component failures, product quality assurance (QA), and critical unique firing tests. [P5 / F8860 - LIGHTWEIGHT ACCEPTANCE TEST AND EVALUATION]: Provides support for acceptance testing of LWT 4T components. [P5 / F8900 - LIGHTWEIGHT PRODUCTION ENGINEERING - CONTRACTOR]: Provides for production support services including program planning, funds management, budgeting, and data management. [P5 - 2 / F8003 LIGHTWEIGHT RECOVERABLE EXERCISE TORPEDO (REXTORP)]: Provides for the procurement of MK-54 REXTORPs. REXTORPs provide a reusable exercise inert torpedo shape for fixed wing, rotary, and surface launched platforms in support of Fleet ASW training and readiness. [P5 - 3 / F8100 - HEAVYWEIGHT EXERCISE AND EXPENDABLES AND COMPONENT REPLACEMENT]: Procures 4T components to support: (1) exercise torpedo builds for fleet proficiency in the submarine and surface command course and tactical development firings; (2) warshot torpedo maintenance to sustain the fleet with an inventory of RFI warshot torpedoes as they come due for maintenance; and (3) assembly of modernized MK 48 MOD 7 components back to an All-Up-Round (AUR) configuration, either exercise or warshot. HWT 4T components include the following: wire coils, flex hoses, Otto Fuel, igniters, propellant, A-cables, A-cable inserts, A-cable receptacles, cylinder barrels, exercise fuel tanks, containers, WES Expansion Boxes, and chamber and valves. [P5 - 3 / F8101 - HEAVYWEIGHT OTHER EQUIPMENT INVESTMENT]: Procure modernized Automatic Test Equipment (ATE) to perform full-up automatic comprehensive system testing of all Torpedo MK 48 variants in an All-Up-Round (AUR) torpedo configuration. Support numerous additional testing evolutions, including factory acceptance testing, proofing, periodic maintenance, group testing, and weapon turnaround/conversion activities. [P5 - 3 / F8843 - HEAVYWEIGHT QUALITY ASSURANCE]: Provides material costs associated with failure analysis and site investigations for torpedo system component failures and product QA and critical unique firing tests. [P5 - 3 / F8833 - HEAVYWEIGHT PRODUCTION ENGINEERING - IN HOUSE]: Provides for production support services at NUWC Divisions KPT/NPT including program planning, funds management, budgeting, data management, acquisition engineering, software management, ILS, and GFE management, training equipment, and configuration management. [P5 - 3 / F8863 - HEAVY WEIGHT ACCEPTANCE TEST AND EVALUATION]: Provides support for acceptance testing of HWT 4T components. [P5 - 3 / F8893 - HEAVYWEIGHT PRODUCTION ENGINEERING - CONTRACTOR]: Provides for production support services including program planning, funds management, budgeting, and data management. LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 2 of 38 P-1 Line #36 Volume 1 - 444 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 3: Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Lightweight Torpedo Support Equipment P-5 2 / Recoverable Exercise Torpedo P-5 3 / Heavyweight Torpedo Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5a, P-21 P-5a, P-21 - - / 332.864 - / 31.904 - / 28.407 - / 30.630 - / 0.000 - - / 12.706 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 30.630 - / 777.102 - / 113.751 - / 125.011 - / 129.815 - / 0.000 - / 129.815 / 1,122.672 - / 145.655 - / 153.418 - / 160.445 - / 0.000 - / 160.445 / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Program Changes: LWT TSE: F8001 (1.1.29) VLA Refurbishment Kit: Funding decreased due to reduction in QTY from 16 in FY26 to 12 in FY27. HWT TSE: Item 1.1 F8100 - HEAVYWEIGHT EXERCISE AND EXPENDABLES AND COMPONENT REPLACEMENT: $1.687 million increase for Increased procurement QTY for WES Expansion Box for installation into MK 48 MOD 7. Item 2.1 F8101 - HEAVYWEIGHT OTHER EQUIPMENT INVESTMENT: $2.571 million increase required for procurement of MK710 Automated Test Equipment (ATE). LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 3 of 38 P-1 Line #36 Volume 1 - 445 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 31.904 28.407 30.630 0.000 30.630 - Gross/Weapon System Cost ($ in Millions) 332.864 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 332.864 Plus CY Advance Procurement ($ in Millions) - - - - - 31.904 28.407 30.630 0.000 30.630 - Total Obligation Authority ($ in Millions) 332.864 FY 2027 Total - - - - - 31.904 28.407 30.630 0.000 30.630 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - F8001 - LWT SUPPORT EQUIPMENT Cost Recurring Cost 1.1.1) F8001 MK46 Maintenance Kits 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) (†) 1.1.3) F8001 MK54 Maintenance Kits (BWLW) (†) 1.1.4) F8001 MK54 (†) Pinger Kits (BWLX) 1.1.5) F8001 MK54 Lanyard Start (†) Assembly (BWJA) 1.1.6) F8001 Propeller Baffles (CWRJ) (†) 1.1.7) F8001 Thermal (†) Battery (5W15) 1.1.8) F8001 Battery, TDS (MK 54) (†) (CWRP) 329.82 285 0.094 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 116.97 4,625 0.541 117.50 400 0.047 120.00 400 0.048 122.50 400 0.049 - - 0.000 122.50 400 0.049 467.45 2,135 0.998 505.00 400 0.202 515.00 400 0.206 525.00 400 0.210 - - 0.000 525.00 400 0.210 49.63 4,030 0.200 55.00 400 0.022 56.10 400 0.022 57.50 400 0.023 - - 0.000 57.50 400 0.023 1,802.98 5,035 9.078 1,905.00 400 0.762 1,943.10 400 0.777 1,982.50 400 0.793 - - 0.000 1,982.50 400 0.793 275.72 3,587 0.989 260.00 400 0.104 265.00 400 0.106 270.00 400 0.108 - - 0.000 270.00 400 0.108 2,117.97 4,230 8.959 1,745.00 400 0.698 1,780.00 400 0.712 1,815.50 400 0.726 - - 0.000 1,815.50 400 0.726 190.88 4,275 0.816 212.50 400 0.085 217.50 400 0.087 221.09 400 0.088 - - 0.000 221.09 400 0.088 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 4 of 38 P-1 Line #36 Volume 1 - 446 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 1.1.9) F8001 Battery, Scuttle (MK54) (†) (CWRQ) 1.1.10) F8001 MK54 Igniter (TH04) (†) 1.1.11) F8001 MK54 BSS Bags 1.1.12) F8001 Electric Initiator (MJ21) (†) 1.1.13) F8001 Generator Assembly, (†) Gas (5W20) 1.1.14) F8001 Valve Assembly , Fuel (†) Shutoff (3W41) 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) (†) 1.1.16) F8001 Pressure Cylinder, (†) Exercise (TW58) 1.1.17) F8001 MK46 Seawater Batteries 1.1.18) F8001 MK31 (†) Stabilizer (QW47) 1.1.19) F8001 VLA Reassembly Kits (†) 1.1.20) F8001 VLA Thermal Battery (CWEC) 1.1.21) F8001 VLA Impulse Cartridge (MT99) (†) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 217.91 3,350 0.730 237.50 400 0.095 242.50 400 0.097 247.50 400 0.099 - - 0.000 247.50 400 0.099 790.00 4,800 3.792 867.50 400 0.347 885.00 400 0.354 902.55 400 0.361 - - 0.000 902.55 400 0.361 24,125.00 16 0.386 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,581.25 2,400 3.795 1,665.00 400 0.666 - - 0.000 - - 0.000 - - 0.000 - - 0.000 11,957.32 2,015 24.094 12,033.33 270 3.249 12,274.34 226 2.774 12,517.46 226 2.829 - - 0.000 12,517.46 226 2.829 803.13 1,600 1.285 845.00 400 0.338 862.50 400 0.345 880.00 400 0.352 - - 0.000 880.00 400 0.352 1,103.08 1,300 1.434 1,160.00 400 0.464 1,182.50 400 0.473 1,207.50 400 0.483 - - 0.000 1,207.50 400 0.483 1,218.75 1,120 1.365 1,275.00 400 0.510 1,300.00 400 0.520 1,327.50 400 0.531 - - 0.000 1,327.50 400 0.531 1,162.50 400 0.465 - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 1,999.00 2,000 3.998 2,122.50 400 0.849 2,165.00 400 0.866 2,208.25 400 0.883 - - 0.000 2,208.25 400 0.883 3,000.00 120 0.360 3,166.67 30 0.095 3,233.33 30 0.097 3,300.00 30 0.099 - - 0.000 3,300.00 30 0.099 - 0.381 - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 200 0.206 50 0.054 50 0.055 50 0.056 - - 0.000 50 0.056 - 1,030.00 - - 1,080.00 - - 1,101.60 - - 1,123.64 - - 1,123.64 1.1.22) F8001 MK792/0 Universal AUR Container - - 1.781 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.23) F8001 Universal REXTORP Containers - - 3.273 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 5 of 38 P-1 Line #36 Volume 1 - 447 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 1.1.24) F8001 Sonobuoys 2,937.50 (†) 1.1.25) F8001 SWT Target Procurement 1.1.26) F8001 VLA Telemetry Kits (†) 1.1.27) F8001 Suspension Bands (T107) (†) 1.1.28) F8001 Otto Fuel Reclamation 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.30) F8001 MK 28 (†) Stabilizer (TA68) Subtotal: Recurring Cost Subtotal: Hardware F8001 - LWT SUPPORT EQUIPMENT Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) ($ M) - 0.086 3,145.83 (Each) ($ M) 48 5.062 115,250.00 4 0.461 117,555.00 4 0.470 120,000.00 2,426.53 3,852 9.347 2,640.00 400 1.056 2,692.80 400 1.077 2,747.50 - 7.082 - 1.105 - 0.511 573,571.43 154 88.330 631,454.55 11 6.946 631,436.81 16 10.103 4,803.95 2,479 11.909 5,210.00 400 2.084 5,315.00 400 2.126 - - 192.269 - - 20.473 - - 22.065 - - 192.269 - - 20.473 - - - 0.151 - 0.088 ($) 105,458.33 - 48 Unit Cost 0.955 - 0.148 ($) Qty - - 48 Unit Cost FY 2027 Base Total Cost 0.564 - 3,083.33 FY 2026 Total Cost 192 - (1) FY 2025 Total Cost 3,208.33 FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) (Each) ($ M) 48 0.154 - - 0.000 - 0.090 - - 0.000 4 0.480 - - 0.000 120,000.00 4 0.480 400 1.099 - - 0.000 2,747.50 400 1.099 - 0.519 - - 0.000 - 0.519 644,076.92 12 7.729 - - 0.000 644,076.92 12 7.729 5,420.00 400 2.168 - - 0.000 5,420.00 400 2.168 - - 19.929 - - 0.000 - - 19.929 22.065 - - 19.929 - - 0.000 - - 19.929 - - 3,208.33 Total Cost Qty - - 48 0.154 - 0.090 Hardware - F8002 LIGHTWEIGHT OTHER EQUIPMENT INVESTMENT Cost Recurring Cost 2.1.1) F8002 Lightweight Other Equipment Investment - - 70.126 - - 6.358 - - 3.020 - - 5.298 - - 0.000 - - 5.298 Subtotal: Recurring Cost - - 70.126 - - 6.358 - - 3.020 - - 5.298 - - 0.000 - - 5.298 Subtotal: Hardware - F8002 LIGHTWEIGHT OTHER EQUIPMENT INVESTMENT Cost - - 70.126 - - 6.358 - - 3.020 - - 5.298 - - 0.000 - - 5.298 Support - F8830 LIGHTWEIGHT PRODUCTION ENGINEERING - IN HOUSE Cost 3.1) F8830 Lightweight Production Engineering (In House) - - 57.816 - - 4.426 - - 2.658 - - 4.716 - - 0.000 - - 4.716 Subtotal: Support F8830 LIGHTWEIGHT PRODUCTION ENGINEERING - IN HOUSE Cost - - 57.816 - - 4.426 - - 2.658 - - 4.716 - - 0.000 - - 4.716 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 6 of 38 P-1 Line #36 Volume 1 - 448 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Support - F8840 - LIGHTWEIGHT QUALITY ASSURANCE Cost 4.1) F8840 Lightweight Quality Assurance - - 0.297 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - F8840 LIGHTWEIGHT QUALITY ASSURANCE Cost - - 0.297 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - F8860 - LIGHTWEIGHT ACCEPTANCE TEST AND EVALUATION Cost 5.1) F8860 Lightweight Acceptance Test and Evaluation - - 7.281 - - 0.309 - - 0.319 - - 0.328 - - 0.000 - - 0.328 Subtotal: Support F8860 - LIGHTWEIGHT ACCEPTANCE TEST AND EVALUATION Cost - - 7.281 - - 0.309 - - 0.319 - - 0.328 - - 0.000 - - 0.328 Support - F8900 - LIGHTWEIGHT PRODUCTION ENGINEERING - CONTRACTOR Cost 6.1) F8900 Lightweight Production Engineering Contractor - - 5.075 - - 0.338 - - 0.345 - - 0.359 - - 0.000 - - 0.359 Subtotal: Support F8900 - LIGHTWEIGHT PRODUCTION ENGINEERING CONTRACTOR Cost - - 5.075 - - 0.338 - - 0.345 - - 0.359 - - 0.000 - - 0.359 Gross/Weapon System Cost - - 332.864 - - 31.904 - - 28.407 - - 30.630 - - 0.000 - - 30.630 Remarks: [Hardware] 4T material is consumed by the Fleet and IMAs each year and must be replaced to maintain required inventory levels (2 year stock level). If funds are marked due to contract award delays, the next years funding is not adequate to replenish material consumed in the year prior, resulting in reduced inventory putting future torpedo builds at risk. All production deliveries, Fleet training, and Warshot maintenance builds depend on 4T material being readily available. (†) indicates the presence of a P-5a Footnotes: (1) F8001 (1.1.29) VLA Refurbishment Kit: Funding decreased due to reduction in QTY from 16 in FY26 to 12 in FY27. LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 7 of 38 P-1 Line #36 Volume 1 - 449 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2020 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2020 Oct 2020 400 107.50 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2021 CMO Industries INC / Buffalo, MN C / FFP NAVSUP Sep 2021 Feb 2022 400 108.75 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2022 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2022 Oct 2022 400 110.92 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2023 CMO Industries INC / Buffalo, MN C / FFP NAVSUP Apr 2023 Sep 2023 400 113.14 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2024 DUMBO Defense / Brooklyn, NY C / FFP NAVSUP Apr 2024 Oct 2024 400 115.00 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2025 DUMBO Defense / Brooklyn, NY C / FFP NAVSUP Apr 2025 Oct 2025 400 117.50 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2026 TBD / TBD C / TBD NAVSUP Apr 2026 Oct 2026 400 120.00 Y 1.1.2) F8001 MK 54 Turnaround Kits (CWQB) 2027 TBD / TBD C / TBD NAVSUP Apr 2027 Oct 2027 400 122.50 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2020 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2020 Oct 2020 200 460.00 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2021 CMO Industries INC / Buffalo, MN C / FFP NAVSUP Sep 2021 Feb 2022 200 467.96 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2022 CMO Industries INC / Buffalo, MN C / FFP NAVSUP Jun 2022 Nov 2022 200 477.32 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2023 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2023 Oct 2023 200 486.87 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2024 DUMBO Defense / Brooklyn,NY C / FFP NAVSUP Apr 2024 Sep 2024 400 495.00 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2025 DUMBO Defense / Brooklyn,NY C / FFP NAVSUP May 2025 Oct 2025 400 505.00 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 400 515.00 Y 1.1.3) F8001 MK54 Maintenance Kits (BWLW) 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 400 525.00 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2020 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2020 Oct 2020 400 50.00 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2021 CMO Industries INC / Buffalo, MN C / FFP NAVSUP Sep 2021 Sep 2021 400 52.21 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2022 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2022 May 2022 400 53.26 Y Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 450 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2023 CMO Industries INC / Buffalo, MN C / FFP NAVSUP May 2023 Oct 2023 400 54.32 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2024 DUMBO Defense / UNKNOWN C / FFP NAVSUP May 2024 Oct 2024 400 55.00 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2025 DUMBO Defense / UNKNOWN C / FFP NAVSUP May 2025 Oct 2025 400 55.00 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 400 56.10 Y 1.1.4) F8001 MK54 Pinger Kits (BWLX) 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 400 57.50 Y 2020 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Aug 2020 Feb 2021 400 0.00 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2021 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Jul 2021 Jan 2022 400 1,759.65 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2022 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Nov 2021 May 2022 400 1,794.84 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2023 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Apr 2023 Oct 2023 400 1,830.74 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2024 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Apr 2024 Oct 2024 400 1,867.50 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2025 TBD / TBD C / FFP NAVSUP Aug 2025 Feb 2026 400 1,905.00 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2026 TBD / TBD C / TBD NAVSUP Apr 2026 Oct 2026 400 1,943.10 Y 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) 2027 TBD / TBD C / TBD NAVSUP Apr 2027 Oct 2027 400 1,982.50 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2020 Electro Mechanical Specialists / Norwich, CT C / FFP NAVSUP Aug 2020 Mar 2021 200 235.00 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2021 Electro Mechanical Specialists / Norwich, CT C / FFP NAVSUP Sep 2021 Apr 2022 200 241.41 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2022 Electro Mechanical Specialists / Norwich, CT C / IDIQ NAVSUP Jun 2022 Jan 2023 200 246.24 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2023 ACM Elite / Stevensville, MT C / IDIQ NAVSUP Apr 2023 Nov 2023 200 251.16 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2024 ACM Elite / Stevensville, MT C / IDIQ NAVSUP Apr 2024 Nov 2024 400 255.00 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2025 ACM Elite / Stevensville, MT C / FFP NAVSUP Nov 2024 Jun 2025 400 260.00 Y Cost Elements 1.1.5) F8001 MK54 Lanyard Start Assembly (BWJA) O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment ✓ LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 9 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 451 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.6) F8001 Propeller Baffles (CWRJ) 2026 TBD / TBD C / TBD NAVSUP Nov 2025 Jun 2026 400 265.00 Y 1.1.6) F8001 Propeller Baffles (CWRJ) 2027 TBD / TBD C / TBD NAVSUP Nov 2026 Jun 2027 400 270.00 Y 1.1.7) F8001 Thermal Battery (5W15) 2020 ADVANCED THERMAL BATTERIES, INC / COCKEYSVILLE, MD C / FFP NAVSUP Dec 2019 May 2020 400 1,580.00 Y 1.1.7) F8001 Thermal Battery (5W15) 2021 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Sep 2021 Mar 2022 400 1,611.52 Y 1.1.7) F8001 Thermal Battery (5W15) 2022 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Feb 2022 Aug 2022 400 1,643.75 Y 1.1.7) F8001 Thermal Battery (5W15) 2023 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Jun 2023 Dec 2023 400 1,676.62 Y 1.1.7) F8001 Thermal Battery (5W15) 2024 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Apr 2024 Oct 2024 400 1,710.00 Y 1.1.7) F8001 Thermal Battery (5W15) 2025 TBD / TBD TBD NAVSUP Aug 2025 Feb 2026 400 1,745.00 Y 1.1.7) F8001 Thermal Battery (5W15) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 400 1,780.00 Y 1.1.7) F8001 Thermal Battery (5W15) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 400 1,815.50 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2020 Airtronics / Tucson, AZ C / FFP NAVSUP May 2020 Oct 2020 400 192.50 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2021 Airtronics / Tucson, AZ C / FFP NAVSUP Jul 2021 Dec 2021 400 195.54 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2022 Airtronics / Tucson, AZ C / FFP NAVSUP Jan 2022 Jun 2022 400 199.45 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2023 Airtronics / Tucson, AZ C / FFP DLA May 2023 Oct 2023 400 203.44 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2024 Airtronics / Tucson, AZ C / FFP DLA May 2024 Oct 2024 400 207.50 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2025 Airtronics / Tucson, AZ TBD DLA May 2025 Oct 2025 400 212.50 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2026 TBD / TBD C / TBD DLA May 2026 Nov 2026 400 217.50 Y 1.1.8) F8001 Battery, TDS (MK 54) (CWRP) 2027 TBD / TBD C / TBD DLA May 2027 Nov 2027 400 221.09 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2020 Airtronics / Tucson, AZ C / FFP NAVSUP Apr 2020 Oct 2020 400 215.00 Y Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 10 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 452 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2021 Airtronics / Tucson, AZ C / FFP NAVSUP Jul 2021 Jan 2022 400 218.28 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2022 Airtronics / Tucson, AZ C / FFP NAVSUP Jan 2022 Jul 2022 400 222.65 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2023 Airtronics / Tucson, AZ C / FFP DLA Apr 2023 Oct 2023 400 227.10 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2024 Airtronics / Tucson, AZ C / FFP DLA Apr 2024 Oct 2024 400 232.50 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2025 Airtronics / Tucson, AZ TBD NAVSUP Apr 2025 Oct 2025 400 237.50 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2026 TBD / TBD C / TBD DLA Apr 2026 Oct 2026 400 242.50 Y 1.1.9) F8001 Battery, Scuttle (MK54) (CWRQ) 2027 TBD / TBD C / TBD DLA Apr 2027 Oct 2027 400 247.50 Y 2020 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Aug 2020 Feb 2021 400 785.00 Y 2021 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Sep 2021 Mar 2022 400 801.05 Y 2022 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Feb 2022 Aug 2022 400 817.07 Y 2023 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Jul 2023 Jan 2024 400 833.41 Y 2024 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Jun 2024 Dec 2024 400 850.00 Y 2025 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Mar 2025 Sep 2025 400 867.50 Y 2026 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / TBD NAVSUP Nov 2025 May 2026 400 885.00 Y Cost Elements 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) 1.1.10) F8001 MK54 Igniter (TH04) O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) 2027 TBD / TBD C / TBD NAVSUP Jun 2027 Dec 2027 400 902.55 Y 1.1.12) F8001 Electric Initiator (MJ21) 2020 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Aug 2020 Feb 2021 400 1,505.00 Y 1.1.12) F8001 Electric Initiator (MJ21) 2021 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP Jul 2021 Jan 2022 400 1,535.00 Y 1.1.12) F8001 Electric Initiator (MJ21) 2022 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP May 2022 Nov 2022 400 1,565.00 Y 1.1.12) F8001 Electric Initiator (MJ21) 2023 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP May 2023 Nov 2023 400 1,595.00 Y 1.1.12) F8001 Electric Initiator (MJ21) 2024 PACIFIC SCIENTIFIC ENERGETIC MATERIALS / HOLLISTER, CA C / FFP NAVSUP May 2024 Nov 2024 400 1,630.00 Y LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 11 of 38 P-1 Line #36 RFP Issue Date Volume 1 - 453 === page 494 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.12) F8001 Electric Initiator (MJ21) 2025 TBD / TBD C / FFP NAVSUP Jul 2025 Jan 2026 400 1,665.00 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2020 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP May 2020 Mar 2021 200 10,890.00 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2021 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP Jul 2021 May 2022 200 11,106.67 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2022 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP May 2022 Mar 2023 200 11,335.00 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2023 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP May 2023 Mar 2024 200 11,560.00 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2024 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP May 2024 Mar 2025 319 11,793.10 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2025 GEN DYNAMICS, RENTON, WA / NUWC, KEYPORT C / FFP NAVSUP May 2025 Mar 2026 270 12,033.33 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2026 TBD / TBD C / TBD NAVSUP May 2026 Mar 2027 226 12,274.34 Y 1.1.13) F8001 Generator Assembly, Gas (5W20) 2027 TBD / TBD C / TBD NAVSUP May 2027 Mar 2028 226 12,517.46 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2021 GENERAL DYNAMICS - 2 / VIRGINIA C / FFP NAVSUP Apr 2022 Sep 2022 400 780.00 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2022 GENERAL DYNAMICS - 2 / VIRGINIA C / FFP NAVSUP May 2022 Oct 2022 400 795.56 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2023 CRTRDGE ACT DVICE / Fairfield, NJ C / FFP NAVSUP May 2023 Nov 2023 400 811.11 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2024 CRTRDGE ACT DVICE / Fairfield, NJ C / FFP NAVSUP May 2024 Nov 2024 400 827.50 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2025 CRTRDGE ACT DVICE - FY14 / Fairfield, NJ C / FFP NAVSUP May 2025 Nov 2025 400 845.00 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 400 862.50 Y 1.1.14) F8001 Valve Assembly , Fuel Shutoff (3W41) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 400 880.00 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2021 Cartridge Actuated Devices/ NAVSUP, GLS / Fairfield, NJ C / FFP NAVSUP May 2021 Nov 2021 300 1,066.67 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2022 Cartridge Actuated Devices/ NAVSUP, GLS / Fairfield, NJ C / FFP NAVSUP May 2022 Nov 2022 300 1,090.00 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2023 Cartridge Actuated Devices/ NAVSUP, GLS / Fairfield, NJ C / FFP NAVSUP May 2023 Nov 2023 300 1,110.00 Y Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 12 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 454 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2024 Cartridge Actuated Devices/ NAVSUP, GLS / Fairfield, NJ C / FFP NAVSUP May 2024 Nov 2024 400 1,134.29 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2025 TBD / TBD TBD NAVSUP Sep 2025 Mar 2026 400 1,160.00 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 400 1,182.50 Y 1.1.15) F8001 Pressure Cylinder, Warshot (YW09) 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 400 1,207.50 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2021 Cartridge Actuated Devices -2 / Fairfield, NJ C / FFP NAVSUP Sep 2021 Feb 2022 240 1,179.17 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2022 Cartridge Actuated Devices -2 / Fairfield, NJ C / FFP NAVSUP Jun 2022 Nov 2022 240 1,200.00 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2023 Cartridge Actuated Devices -2 / Fairfield, NJ C / FFP NAVSUP Jun 2023 Nov 2023 240 1,225.00 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2024 Cartridge Actuated Devices -2 / Fairfield, NJ C / FFP NAVSUP Jun 2024 Nov 2024 400 1,250.00 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2025 TBD / TBD C / FFP NAVSUP Sep 2025 Feb 2026 400 1,275.00 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2026 TBD / TBD C / TBD NAVSUP Jun 2026 Nov 2026 400 1,300.00 Y 1.1.16) F8001 Pressure Cylinder, Exercise (TW58) 2027 TBD / TBD C / TBD NAVSUP Jun 2027 Nov 2027 400 1,327.50 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2020 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP Aug 2020 Feb 2021 400 1,920.00 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2021 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP Apr 2022 Oct 2022 400 1,960.00 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2022 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP May 2022 Nov 2022 400 1,997.50 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2023 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP May 2023 Nov 2023 400 2,037.50 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2024 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP May 2024 Nov 2024 400 2,080.00 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2025 UNITED TEREX INC, NOR PA / FAIRVIEW VILLAGE, PA/NUWC, KEYPORT C / FFP NAVSUP Jul 2025 Jan 2026 400 2,122.50 Y LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 13 of 38 P-1 Line #36 (Each) RFP Issue Date Volume 1 - 455 === page 496 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.18) F8001 MK31 Stabilizer (QW47) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 400 2,165.00 Y 1.1.18) F8001 MK31 Stabilizer (QW47) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 400 2,208.25 Y 1.1.19) F8001 VLA Reassembly Kits 2021 Sunbelt Design & Developement FY16 / NAVSUP, GLS C / FFP NAVSUP May 2022 Oct 2022 30 2,900.00 Y 1.1.19) F8001 VLA Reassembly Kits 2022 Sunbelt Design & Developement FY16 / NAVSUP, GLS C / FFP NAVSUP Jul 2022 Dec 2022 30 2,966.67 Y 1.1.19) F8001 VLA Reassembly Kits 2023 Sunbelt Design & Developement FY16 / NAVSUP, GLS C / FFP NAVSUP May 2023 Oct 2023 30 3,033.33 Y 1.1.19) F8001 VLA Reassembly Kits 2024 Sunbelt Design & Developement FY16 / NAVSUP, GLS C / FFP NAVSUP May 2024 Oct 2024 30 3,100.00 Y 1.1.19) F8001 VLA Reassembly Kits 2025 TBD / TBD C / FFP NAVSUP Aug 2025 Jan 2026 30 3,166.67 Y 1.1.19) F8001 VLA Reassembly Kits 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 30 3,233.33 Y 1.1.19) F8001 VLA Reassembly Kits 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 30 3,300.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2021 Pacific Scientific / Chandler, AZ C / IDIQ NAVSUP Mar 2022 Sep 2022 50 1,000.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2022 Pacific Scientific / Chandler, AZ C / IDIQ NAVSUP May 2022 Nov 2022 50 1,020.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2023 Pacific Scientific / Chandler, AZ C / FFP NAVSUP Jun 2023 Dec 2023 50 1,040.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2024 Pacific Scientific / Chandler, AZ C / FFP NAVSUP Apr 2024 Oct 2024 50 1,060.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2025 TBD / TBD C / FFP NAVSUP Aug 2025 Feb 2026 50 1,080.00 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2026 TBD / TBD C / TBD NAVSUP Apr 2026 Oct 2026 50 1,101.60 Y 1.1.21) F8001 VLA Impulse Cartridge (MT99) 2027 TBD / TBD C / TBD NAVSUP Apr 2027 Oct 2027 50 1,123.64 Y 2021 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / FFP NUWC, KEYPORT May 2021 Nov 2021 48 2,854.17 Y 2022 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / FFP NUWC, KEYPORT Apr 2022 Oct 2022 48 2,916.67 Y 2023 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / FFP NUWC, KEYPORT Apr 2023 Oct 2023 48 2,958.33 Y Cost Elements 1.1.24) F8001 Sonobuoys 1.1.24) F8001 Sonobuoys 1.1.24) F8001 Sonobuoys O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 14 of 38 P-1 Line #36 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 456 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / FFP NUWC, KEYPORT Apr 2024 Oct 2024 48 3,020.83 Y 2025 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / FFP NUWC, KEYPORT May 2025 Nov 2025 48 3,083.33 Y 2026 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / TBD NUWC, KEYPORT May 2026 Nov 2026 48 3,145.83 Y 2027 UNDERSEA SENSOR SYSTEMS INC / COLUMBIA CITY, IN C / TBD NUWC, KEYPORT May 2027 Nov 2027 48 3,208.33 Y 1.1.26) F8001 VLA Telemetry Kits 2021 VARIOUS / CHINA LAKE C / FFP CHINA LAKE Jun 2021 Dec 2021 4 106,500.00 Y 1.1.26) F8001 VLA Telemetry Kits 2022 VARIOUS / CHINA LAKE C / FFP CHINA LAKE Jun 2022 Dec 2022 4 108,750.00 Y 1.1.26) F8001 VLA Telemetry Kits 2023 VARIOUS / CHINA LAKE C / FFP CHINA LAKE Jun 2023 Dec 2023 4 110,750.00 Y 1.1.26) F8001 VLA Telemetry Kits 2024 VARIOUS / CHINA LAKE C / FFP CHINA LAKE Jun 2024 Dec 2024 4 113,000.00 Y 1.1.26) F8001 VLA Telemetry Kits 2025 VARIOUS / CHINA LAKE C / FFP CHINA LAKE Jun 2025 Dec 2025 4 115,250.00 Y 1.1.26) F8001 VLA Telemetry Kits 2026 VARIOUS / CHINA LAKE C / TBD CHINA LAKE Jun 2026 Dec 2026 4 117,555.00 Y 1.1.26) F8001 VLA Telemetry Kits 2027 VARIOUS / CHINA LAKE C / TBD CHINA LAKE Jun 2027 Dec 2027 4 120,000.00 Y 1.1.27) F8001 Suspension Bands (T107) 2021 United Terex Inc., Fairfield Village, PA / New MFG - Loc C / FFP NAVSUP Apr 2022 Sep 2022 400 2,437.78 Y 1.1.27) F8001 Suspension Bands (T107) 2022 United Terex Inc., Fairfield Village, PA / New MFG - Loc C / FFP NAVSUP May 2022 Oct 2022 400 2,486.67 Y 1.1.27) F8001 Suspension Bands (T107) 2023 United Terex Inc., Fairfield Village, PA / New MFG - Loc C / FFP NAVSUP Jul 2023 Dec 2023 400 2,537.78 Y 1.1.27) F8001 Suspension Bands (T107) 2024 United Terex Inc., Fairfield Village, PA / New MFG - Loc C / FFP NAVSUP Apr 2024 Sep 2024 400 2,587.50 Y 1.1.27) F8001 Suspension Bands (T107) 2025 TBD / TBD C / FFP NAVSUP Aug 2025 Jan 2026 400 2,640.00 Y 1.1.27) F8001 Suspension Bands (T107) 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 400 2,692.80 Y 2019 LOCKHEED MARTIN / Akron, OH SS / FFP NAVSUP Jul 2020 Feb 2022 22 555,227.27 Y 2021 LOCKHEED MARTIN / Akron, OH SS / FFP NAVSUP Mar 2021 Jul 2022 22 491,818.18 Y 2022 LOCKHEED MARTIN / Akron, OH SS / FFP NAVSUP Jul 2022 Feb 2024 22 495,545.45 Y 2023 LOCKHEED MARTIN / Akron, OH SS / FFP NAVSUP Jul 2023 Nov 2024 22 506,636.36 Y 1.1.24) F8001 Sonobuoys 1.1.24) F8001 Sonobuoys 1.1.24) F8001 Sonobuoys 1.1.24) F8001 Sonobuoys 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 15 of 38 P-1 Line #36 (Each) RFP Issue Date Volume 1 - 457 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 FY Contractor and Location 2024 LOCKHEED MARTIN / Akron, OH C / FFP NAVSUP Aug 2026 Dec 2027 11 613,000.00 Y 2025 LOCKHEED MARTIN / Akron, OH C / FFP NAVSUP Aug 2026 Dec 2027 11 631,454.55 Y 2026 LOCKHEED MARTIN / Akron, OH C / FFP NAVSUP Aug 2027 Dec 2028 16 631,436.81 Y 2027 LOCKHEED MARTIN / Akron, OH C / FFP NAVSUP Aug 2028 Dec 2029 12 644,076.92 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2021 United Terex, Inc / Fairfield Village, PA C / FFP NAVSUP May 2022 Nov 2022 300 4,813.33 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2022 United Terex, Inc / Fairfield Village, PA C / FFP NAVSUP Jun 2022 Dec 2022 319 4,910.00 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2023 United Terex, Inc / Fairfield Village, PA C / FFP NAVSUP Aug 2023 Feb 2024 385 5,007.79 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2024 United Terex, Inc / Fairfield Village, PA C / FFP NAVSUP Apr 2024 Oct 2024 400 5,107.50 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2025 United Terex, Inc / Fairfield Village, PA C / FFP NAVSUP Jun 2025 Dec 2025 400 5,210.00 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2026 TBD / TBD C / TBD NAVSUP Apr 2026 Oct 2026 400 5,315.00 Y 1.1.30) F8001 MK 28 Stabilizer (TA68) 2027 TBD / TBD C / TBD NAVSUP Oct 2026 Apr 2027 400 5,420.00 Y 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) 1.1.29) F8001 VLA Refurbishment Kits (†) Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Method/Type or Funding Vehicle Cost Elements (†) O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 16 of 38 P-1 Line #36 Volume 1 - 458 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 55 1 2019 NAVY 22 0 22 1 2021 NAVY 22 0 22 A - - - - - - - - - - - - - - - 22 A - - - - - - - 1 2022 NAVY 22 0 22 22 22 1 2023 NAVY 22 0 22 22 1 2024 NAVY 11 0 11 11 1 2025 NAVY 11 0 11 11 1 2026 NAVY 16 0 16 16 1 2027 NAVY 12 0 12 12 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 459 === page 500 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 55 1 2019 NAVY 22 0 22 - - - - 11 - 11 1 2021 NAVY 22 0 22 - - - - - - - 0 1 2022 NAVY 22 0 22 1 2023 NAVY 22 0 22 1 2024 NAVY 11 0 11 11 1 2025 NAVY 11 0 11 11 1 2026 NAVY 16 0 16 16 1 2027 NAVY 12 0 12 - - 11 11 A - 0 - - - - - - - - - - - - - - 22 A - - - 22 12 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 460 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 55 1 2019 NAVY 22 22 0 1 2021 NAVY 22 22 0 0 1 2022 NAVY 22 0 22 - - - - 11 11 1 2023 NAVY 22 0 22 - - - - - - 1 2024 NAVY 11 0 11 11 1 2025 NAVY 11 0 11 11 1 2026 NAVY 16 0 16 16 1 2027 NAVY 12 0 12 0 0 - - - - - - - 11 11 0 12 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 461 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 55 1 2019 NAVY 22 22 0 0 1 2021 NAVY 22 22 0 0 1 2022 NAVY 22 22 0 0 1 2023 NAVY 22 22 0 1 2024 NAVY 11 0 11 A - - - - - - - - - - - - 1 2025 NAVY 11 0 11 A - - - - - - - - - - - - 1 2026 NAVY 16 0 16 1 2027 NAVY 12 0 12 0 - - 11 - - 11 A - - 16 12 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 462 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 55 1 2019 NAVY 22 22 0 0 1 2021 NAVY 22 22 0 0 1 2022 NAVY 22 22 0 0 1 2023 NAVY 22 22 0 1 2024 NAVY 11 0 11 - - 11 1 2025 NAVY 11 0 11 - - 11 1 2026 NAVY 16 0 16 - - - 1 2027 NAVY 12 0 12 0 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C 0 0 J A N F E B M A R A P R M A Y J U N J U L - - - - 11 A - - - - - A U G UNCLASSIFIED Page 21 of 38 S E P O C T N O V D E C 5 0 J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G - 12 S E P Volume 1 - 463 === page 504 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT 1.1.29) F8001 VLA Refurbishment Kits Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 55 1 2019 NAVY 22 22 0 0 1 2021 NAVY 22 22 0 0 1 2022 NAVY 22 22 0 0 1 2023 NAVY 22 22 0 0 1 2024 NAVY 11 11 0 0 1 2025 NAVY 11 11 0 0 1 2026 NAVY 16 16 0 1 2027 NAVY 12 0 12 0 O C T LI 3301 - Torpedo Support Equipment Navy N O V 7 D E C 5 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 464 === page 505 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 1 / Lightweight Torpedo Support Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 LOCKHEED MARTIN Akron, OH MSR For 2027 1-8-5 For 2027 MAX For 2027 11 22 33 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 19 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 16 16 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 23 of 38 P-1 Line #36 Volume 1 - 465 === page 506 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Recoverable Exercise Torpedo MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 12.706 0.000 0.000 0.000 0.000 0.000 - - - - - - 12.706 0.000 0.000 0.000 0.000 0.000 - - - - - - 12.706 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - F8003 LIGHTWEIGHT RECOVERABLE EXERCISE TORPEDO (REXTORP) Cost Recurring Cost 1.1.1) Lightweight REXTORP Bodies / Assembly & Test 46,794.24 243 11.371 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) Lightweight REXTORP Fire Control Modules / Assembly & Test 4,959.02 122 0.605 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.3) Lightweight REXTORP Containers / Assembly & Test 10,428.57 70 0.730 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 12.706 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware F8003 LIGHTWEIGHT RECOVERABLE EXERCISE TORPEDO (REXTORP) Cost - - 12.706 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 12.706 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 24 of 38 P-1 Line #36 Volume 1 - 466 === page 507 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 777.102 Less PY Advance Procurement ($ in Millions) 113.751 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 129.815 - 0.000 - 125.011 129.815 - 129.815 - 113.751 FY 2027 Total 0.000 - 125.011 - 777.102 - - 113.751 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 125.011 - 777.102 FY 2027 Base - 129.815 - 129.815 - 0.000 129.815 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - F8100 - HEAVYWEIGHT EXERCISE AND EXPENDABLES AND COMPONENT REPLACEMENT Cost Recurring Cost 1.1.1) F8100 Guidance and Control Assembly 311,829.79 47 14.656 (†) 5,045.63 2,345 11.832 1.1.3) F8100 MK 62-1 A-Cable Insert 269.29 7,375 4,123.12 1.1.2) F8100 MK 62-1 A-Cable (CWFP) (CWLE) (†) 1.1.4) F8100 MK 62-1 A-Cable Receptacle (†) (CWLD) 1.1.5) F8100 Flex Hose (Improved) (†) (CWQC) 1.1.6) F8100 Strong (†) Flex Hose (WW97) 1.1.7) F8100 Igniter (†) (TH01) 1.1.8) F8100 Propellant (WW98) (†) - 0.000 - 0.000 5,626.25 800 4.501 5,795.00 800 4.636 1.986 306.25 800 0.245 316.25 800 1,925 7.937 3,273.75 800 2.619 3,372.50 3,893.17 5,195 20.225 3,230.00 800 2.584 1,680.60 2,655 4.462 1,866.25 800 949.74 8,695 8.258 1,591.67 2,400.45 8,825 21.184 2,632.50 LI 3301 - Torpedo Support Equipment Navy - - - 0.000 - - 0.000 5,968.75 800 4.775 - - 0.000 0.253 322.50 800 0.258 - - 800 2.698 3,473.75 800 2.779 - 3,327.50 800 2.662 3,393.75 800 2.715 1.493 1,922.50 800 1.538 1,961.25 800 1,200 1.910 1,639.17 1,200 1.967 1,671.67 1,200 3.159 2,711.67 1,200 3.254 2,793.33 UNCLASSIFIED Page 25 of 38 - - 0.000 5,968.75 800 4.775 0.000 322.50 800 0.258 - 0.000 3,473.75 800 2.779 - - 0.000 3,393.75 800 2.715 1.569 - - 0.000 1,961.25 800 1.569 1,200 2.006 - - 0.000 1,671.67 1,200 2.006 1,200 3.352 - - 0.000 2,793.33 1,200 3.352 P-1 Line #36 - Volume 1 - 467 === page 508 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 1.1.9) F8100 Scuttle Valve (SW94) (†) 1.1.10) F8100 Sub Wire Coil (TW92) (†) 1.1.11) F8100 Torpedo Wire Coil (†) (SW83) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 1,335.34 498 0.665 4,200.00 60 0.252 4,316.67 60 0.259 4,450.00 60 0.267 - - 0.000 4,450.00 60 0.267 5,724.93 9,125 52.240 4,948.33 1,200 5.938 5,096.67 1,200 6.116 5,249.17 1,200 6.299 - - 0.000 5,249.17 1,200 6.299 9,663.85 6,625 64.023 10,643.33 1,200 12.772 10,962.50 1,200 13.155 11,181.67 1,200 13.418 - - 0.000 11,181.67 1,200 13.418 1.1.12) F8100 OTTO Fuel - Moser Plant Warm - - 7.600 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.13) F8100 Otto Fuel - - 84.142 - - 8.796 - - 8.971 - - 9.190 - - 0.000 - - 9.190 3,095.20 8,750 27.083 1,200 3.850 1,200 3.965 1,200 4.045 - - 0.000 1,200 4.045 2,185.19 486 1.062 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.14) F8100 Crossover Batteries (†) (CWRG) 1.1.15) F8100 Sonobuoys 3,208.33 3,304.17 3,370.83 3,370.83 1.1.16) F8100 A/B Dampening Material - - 1.016 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.17) F8100 SWT Target Procurment - - 1.299 - - 0.581 - - 0.593 - - 0.605 - - 0.000 - - 0.605 1.1.18) F8100 ORDALTS - - 6.650 - - 0.938 - - 0.957 - - 0.986 - - 0.000 - - 0.986 1.1.19) F8100 Deep Proofer Kits 1 4,236.84 570 2.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.20) F8100 Deep Proofer Kits 2 4,462.22 450 2.008 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4,804.17 2,400 11.530 800 5.258 800 5.363 800 5.470 - - 0.000 800 5.470 229,520.00 50 11.476 - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 27,611.04 815 22.503 327 11.990 333 12.577 341 13.265 - - 0.000 341 13.265 1,093K 20 21.858 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 408.110 - - 66.886 - - 68.964 - - 70.999 - - 0.000 - - 70.999 1.1.21) F8100 Short Wire Coils (CWRT) (†) 1.1.22) F8100 Replacement Nose Arrays 1.1.23) F8100 WES (†) (2) Expansion Box 1.1.24) F8100 Replacement Warshot Afterbodies (†) Subtotal: Recurring Cost LI 3301 - Torpedo Support Equipment Navy 6,572.50 36,666.67 6,703.75 37,768.77 UNCLASSIFIED Page 26 of 38 6,837.50 38,900.29 P-1 Line #36 6,837.50 38,900.29 Volume 1 - 468 === page 509 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware F8100 - HEAVYWEIGHT EXERCISE AND EXPENDABLES AND COMPONENT REPLACEMENT Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) 408.110 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 66.886 - - 68.964 - - 70.999 - - 0.000 - - 70.999 Hardware - F8101 - HEAVYWEIGHT OTHER EQUIPMENT INVESTMENT Cost Recurring Cost 2.1.1) Heavyweight Other Equipment - - 244.834 - - 37.184 - - 46.074 - - 48.645 - - 0.000 - - 48.645 Subtotal: Recurring Cost - - 244.834 - - 37.184 - - 46.074 - - 48.645 - - 0.000 - - 48.645 Subtotal: Hardware - F8101 - HEAVYWEIGHT OTHER EQUIPMENT INVESTMENT Cost - - 244.834 - - 37.184 - - 46.074 - - 48.645 - - 0.000 - - 48.645 Investment (3) Support - F8843 - HEAVYWEIGHT QUALITY ASSURANCE Cost 3.1) Heavyweight Quality Assurance - - 2.842 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - F8843 HEAVYWEIGHT QUALITY ASSURANCE Cost - - 2.842 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - F8833 - HEAVYWEIGHT PRODUCTION ENGINEERING - IN HOUSE Cost 4.1) Heavyweight Production Engineering (In-House) - - 91.261 - - 7.617 - - 7.847 - - 8.003 - - 0.000 - - 8.003 Subtotal: Support F8833 - HEAVYWEIGHT PRODUCTION ENGINEERING - IN HOUSE Cost - - 91.261 - - 7.617 - - 7.847 - - 8.003 - - 0.000 - - 8.003 Support - F8863 - HEAVY WEIGHT ACCEPTANCE TEST AND EVALUATION Cost 5.1) Heavyweight Acceptance Test and Evaulation - - 12.955 - - 1.030 - - 1.061 - - 1.082 - - 0.000 - - 1.082 Subtotal: Support F8863 - HEAVY WEIGHT ACCEPTANCE TEST AND EVALUATION Cost - - 12.955 - - 1.030 - - 1.061 - - 1.082 - - 0.000 - - 1.082 Support - F8893 - HEAVYWEIGHT PRODUCTION ENGINEERING - CONTRACTOR Cost LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 27 of 38 P-1 Line #36 Volume 1 - 469 === page 510 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 6.1) Heavyweight Production Engineering Contractor Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 17.100 - - 1.034 - - 1.065 - - 1.086 - - 0.000 - - 1.086 Subtotal: Support F8893 - HEAVYWEIGHT PRODUCTION ENGINEERING CONTRACTOR Cost - - 17.100 - - 1.034 - - 1.065 - - 1.086 - - 0.000 - - 1.086 Gross/Weapon System Cost - - 777.102 - - 113.751 - - 125.011 - - 129.815 - - 0.000 - - 129.815 Remarks: [Hardware] 4T material is consumed by the Fleet and IMAs each year and must be replaced to maintain required inventory levels (2 year stock level). If funds are marked due to contract award delays, the next years funding is not adequate to replenish material consumed in the year prior, resulting in reduced inventory putting future torpedo builds at risk. All production deliveries, Fleet training, and Warshot maintenance builds depend on 4T material being readily available. (†) indicates the presence of a P-5a Footnotes: (2) Item 1.1.23 F8100 - HEAVYWEIGHT EXERCISE AND EXPENDABLES AND COMPONENT REPLACEMENT: $1.687M increase for increased procurement QTY for WES Expansion Box for installation into MK 48 MOD 7. (3) Item 2.1.1 F8101 - HEAVYWEIGHT OTHER EQUIPMENT INVESTMENT: $2.571M increase required for procurement of MK710 Automated Test Equipment (ATE) LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 28 of 38 P-1 Line #36 Volume 1 - 470 === page 511 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2021 DCX-CHOL / Chatsworth, CA C / FFP NAVSUP Sep 2021 Apr 2022 250 4,108.00 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2022 DCX-CHOL / Chatsworth, CA C / FFP NAVSUP Jul 2022 Feb 2023 250 4,188.00 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2023 Newvac LLC / Chatsworth,CA C / FFP NAVSUP Jun 2023 Jan 2024 325 4,270.77 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2024 Newvac LLC / Chatsworth,CA C / FFP NAVSUP Apr 2024 Nov 2024 800 5,462.50 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2025 Newvac LLC / Chatsworth,CA C / FFP NAVSUP Apr 2025 Nov 2025 800 5,626.25 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2026 Newvac LLC / Chatsworth,CA C / FFP NAVSUP Apr 2026 Nov 2026 800 5,795.00 Y 1.1.2) F8100 MK 62-1 A-Cable (CWFP) 2027 Newvac LLC / Chatsworth,CA C / FFP NAVSUP Apr 2027 Nov 2027 800 5,968.75 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2021 TE Connectivity Seacon Phoenix Inc / ASHAWAY, RI C / FFP NAVSUP Sep 2021 Feb 2022 250 276.00 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2022 Newvac LLC / UNKNOWN C / FFP NAVSUP Jul 2022 Dec 2022 250 284.00 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2023 Newvac LLC / UNKNOWN C / FFP NAVSUP Apr 2023 Sep 2023 325 289.23 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2024 Newvac LLC / UNKNOWN C / FFP NAVSUP Apr 2024 Sep 2024 800 297.50 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2025 Newvac LLC / UNKNOWN C / FFP NAVSUP Apr 2025 Sep 2025 800 306.25 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2026 TBD / TBD C / TBD NAVSUP Apr 2026 Apr 2026 800 316.25 Y 1.1.3) F8100 MK 62-1 A-Cable Insert (CWLE) 2027 TBD / TBD C / TBD NAVSUP Apr 2027 Sep 2027 800 322.50 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2021 TE Connectivity Seacon / ASHAWAY, RI C / FFP NAVSUP Sep 2021 Feb 2022 250 2,040.00 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2022 Newvac LLC / Chatsworth, CA C / FFP NAVSUP May 2022 Oct 2022 250 2,080.00 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2023 Newvac LLC / Chatsworth, CA C / FFP NAVSUP Apr 2023 Sep 2023 325 2,123.08 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2024 Newvac LLC / Chatsworth, CA C / FFP NAVSUP May 2024 Oct 2024 800 3,178.75 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2025 TBD / TBD C / FFP NAVSUP Sep 2025 Feb 2026 800 3,273.75 Y Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 29 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 471 === page 512 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 800 3,372.50 Y 1.1.4) F8100 MK 62-1 A-Cable Receptacle (CWLD) 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 800 3,473.75 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2021 Umbilicals International Inc / Colchester, VT C / FFP NAVSUP Mar 2023 Sep 2023 475 2,616.84 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2022 Umbilicals International Inc / Colchester, VT C / FFP NAVSUP Mar 2023 Sep 2023 475 2,670.00 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2023 Umbilicals International Inc / Colchester, VT C / FFP NAVSUP May 2023 Nov 2023 525 2,721.90 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2024 Umbilicals International Inc / Colchester, VT C / FFP NAVSUP May 2024 Nov 2024 800 3,136.25 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2025 TBD / TBD C / FFP NAVSUP Sep 2025 Mar 2026 800 3,230.00 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 800 3,327.50 Y 1.1.5) F8100 Flex Hose (Improved) (CWQC) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 800 3,393.75 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2021 PRECISION HOSE INC. / STONE MOUNTAIN, GA C / FFP NAVSUP Jun 2022 Nov 2022 250 1,580.00 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2022 PRECISION HOSE INC. / STONE MOUNTAIN, GA C / FFP NAVSUP Jul 2022 Dec 2022 250 1,612.00 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2023 PRECISION HOSE INC. / STONE MOUNTAIN, GA C / FFP NAVSUP Jul 2023 Dec 2023 325 1,646.15 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2024 PRECISION HOSE INC. / STONE MOUNTAIN, GA C / FFP NAVSUP May 2024 Oct 2024 800 1,812.50 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2025 PRECISION HOSE INC. / STONE MOUNTAIN, GA C / FFP NAVSUP Apr 2025 Sep 2025 800 1,866.25 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 800 1,922.50 Y 1.1.6) F8100 Strong Flex Hose (WW97) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 800 1,961.25 Y 1.1.7) F8100 Igniter (TH01) 2021 Ametek Ameron LLC / Maine C / FFP NAVSUP Sep 2021 Feb 2022 750 754.67 Y 1.1.7) F8100 Igniter (TH01) 2022 Ametek Ameron LLC / Maine C / FFP NAVSUP Aug 2022 Jan 2023 775 770.32 Y 2023 Cartridge Actuated Devices / Fairfield,NJ C / FFP NAVSUP Jun 2023 Nov 2023 800 786.25 Y 2024 Cartridge Actuated Devices / Fairfield,NJ C / FFP NAVSUP Jun 2024 Nov 2024 1,200 1,545.00 Y Cost Elements 1.1.7) F8100 Igniter (TH01) 1.1.7) F8100 Igniter (TH01) O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 30 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 472 === page 513 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 Cartridge Actuated Devices / Fairfield,NJ C / FFP NAVSUP May 2025 May 2025 1,200 1,591.67 Y 1.1.7) F8100 Igniter (TH01) 2026 TBD / TBD C / TBD NAVSUP Jun 2026 Nov 2026 1,200 1,639.17 Y 1.1.7) F8100 Igniter (TH01) 2027 TBD / TBD C / TBD NAVSUP Jun 2027 Nov 2027 1,200 1,671.67 Y 1.1.8) F8100 Propellant (WW98) 2021 Northrup Grumman / Elkton, MD C / FFP NAVSUP Apr 2022 Nov 2022 750 1,920.00 Y 1.1.8) F8100 Propellant (WW98) 2022 Northrup Grumman / Elkton, MD C / FFP NAVSUP Jul 2022 Feb 2023 775 1,958.71 Y 1.1.8) F8100 Propellant (WW98) 2023 Northrup Grumman / Elkton, MD C / FFP NAVSUP May 2023 Dec 2023 800 1,998.75 Y 1.1.8) F8100 Propellant (WW98) 2024 Northrup Grumman / Elkton, MD C / FFP NAVSUP May 2024 Dec 2024 1,200 2,555.83 Y 1.1.8) F8100 Propellant (WW98) 2025 Northrup Grumman / Elkton, MD C / FFP NAVSUP Jul 2025 Feb 2026 1,200 2,632.50 Y 1.1.8) F8100 Propellant (WW98) 2026 TBD / TBD C / TBD NAVSUP May 2026 Nov 2026 1,200 2,711.67 Y 1.1.8) F8100 Propellant (WW98) 2027 TBD / TBD C / TBD NAVSUP May 2027 Nov 2027 1,200 2,793.33 Y 2021 Cartridge Actuated Devices / Fairfield, NJ C / FFP NAVSUP Mar 2022 Nov 2022 36 1,083.33 Y 2022 Cartridge Actuated Devices / Fairfield, NJ C / FFP NAVSUP Mar 2022 Nov 2022 36 1,111.11 Y 2023 Cartridge Actuated Devices / Fairfield, NJ C / FFP NAVSUP May 2023 Jan 2024 36 1,138.89 Y 2024 Cartridge Actuated Devices / Fairfield, NJ C / FFP NAVSUP May 2024 Jan 2025 60 4,066.67 Y 2025 Cartridge Actuated Devices / Fairfield, NJ C / FFP NAVSUP Aug 2025 Apr 2026 60 4,200.00 Y 1.1.9) F8100 Scuttle Valve (SW94) 2026 TBD / TBD C / TBD NAVSUP May 2026 Jan 2027 60 4,316.67 Y 1.1.9) F8100 Scuttle Valve (SW94) 2027 TBD / TBD C / TBD NAVSUP May 2027 Jan 2028 60 4,450.00 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2020 Entwistle Company / Hudson, MA C / FFP NAVSUP Aug 2020 Jan 2021 700 4,158.57 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2021 Entwistle Company / Hudson, MA C / FFP NAVSUP Jul 2021 Dec 2021 750 4,241.33 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2022 Entwistle Company / Hudson, MA C / FFP NAVSUP Sep 2022 Feb 2023 775 4,326.45 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2023 Entwistle Company / Hudson, MA C / FFP NAVSUP Jun 2023 Nov 2023 800 4,412.50 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2024 Entwistle Company / Hudson, MA C / FFP NAVSUP Jun 2024 Nov 2024 1,200 4,804.17 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2025 TBD / TBD C / FFP NAVSUP Aug 2025 Mar 2026 1,200 4,948.33 Y 1.1.10) F8100 Sub Wire Coil (TW92) 2026 TBD / TBD C / TBD NAVSUP Oct 2025 May 2026 1,200 5,096.67 Y 1.1.7) F8100 Igniter (TH01) 1.1.9) F8100 Scuttle Valve (SW94) 1.1.9) F8100 Scuttle Valve (SW94) 1.1.9) F8100 Scuttle Valve (SW94) 1.1.9) F8100 Scuttle Valve (SW94) 1.1.9) F8100 Scuttle Valve (SW94) LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 31 of 38 P-1 Line #36 (Each) RFP Issue Date Volume 1 - 473 === page 514 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1.10) F8100 Sub Wire Coil (TW92) 2027 TBD / TBD C / TBD NAVSUP Oct 2026 May 2027 1,200 5,249.17 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2020 ENTWISTLE / HUDSON, MA C / FFP NAVSUP Aug 2020 Jan 2021 700 6,441.43 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2021 ENTWISTLE / HUDSON, MA C / FFP NAVSUP Jul 2021 Dec 2021 750 6,570.67 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2022 ENTWISTLE / HUDSON, MA C / FFP NAVSUP Aug 2022 Jan 2023 775 6,703.23 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2023 ENTWISTLE / HUDSON, MA C / FFP NAVSUP Jun 2023 Nov 2023 800 6,836.25 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2024 ENTWISTLE / HUDSON, MA C / FFP NAVSUP Jun 2024 Nov 2024 1,200 10,333.33 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2025 TBD / TBD TBD NAVSUP Sep 2025 Mar 2026 1,200 10,643.33 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2026 TBD / TBD TBD NAVSUP Jun 2026 Dec 2026 1,200 10,962.50 Y 1.1.11) F8100 Torpedo Wire Coil (SW83) 2027 TBD / TBD TBD NAVSUP Jun 2027 Dec 2027 1,200 11,181.67 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2020 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Aug 2020 Jan 2021 700 2,802.86 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2021 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Sep 2021 Feb 2022 750 2,860.00 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2022 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP Aug 2022 Jan 2023 775 2,917.42 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2023 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP May 2023 Oct 2023 800 2,975.00 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2024 EAGLEPICHER TECH / JOPLIN, MO C / FFP NAVSUP May 2024 Oct 2024 1,200 3,115.00 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2025 TBD / TBD C / FFP NAVSUP Sep 2025 Feb 2026 1,200 3,208.33 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2026 TBD / TBD C / TBD NAVSUP May 2026 Oct 2026 1,200 3,304.17 Y 1.1.14) F8100 Crossover Batteries (CWRG) 2027 TBD / TBD C / TBD NAVSUP May 2027 Oct 2027 1,200 3,370.83 Y 1.1.21) F8100 Short Wire Coils (CWRT) 2024 Entwistle Company / Hudson, MA C / FFP NAVSUP Apr 2024 Aug 2024 800 6,443.75 Y 1.1.21) F8100 Short Wire Coils (CWRT) 2025 Entwistle Company / Hudson, MA C / FFP NAVSUP Apr 2025 Aug 2025 800 6,572.50 Y Cost Elements O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment LI 3301 - Torpedo Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 32 of 38 P-1 Line #36 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 474 === page 515 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 FY Contractor and Location 1.1.21) F8100 Short Wire Coils (CWRT) 2026 Entwistle Company / Hudson, MA C / FFP NAVSUP Apr 2026 Aug 2026 800 6,703.75 Y 1.1.21) F8100 Short Wire Coils (CWRT) 2027 UNKNOWN / NAVSUP GLS C / TBD NAVSUP Apr 2027 Oct 2027 800 6,837.50 Y 1.1.23) F8100 WES Expansion Box 2022 Multiple Vendors / Various C / FFP DLA Sep 2022 Sep 2023 230 15,426.09 Y 1.1.23) F8100 WES Expansion Box 2023 Multiple Vendors / Various C / FFP DLA May 2023 May 2024 230 15,734.78 Y 1.1.23) F8100 WES Expansion Box 2024 Multiple Vendors / Various C / FFP DLA Jun 2024 Jun 2025 355 33,594.37 Y 1.1.23) F8100 WES Expansion Box 2025 Multiple Vendors / Various C / FFP DLA Jun 2025 Jun 2026 327 36,666.67 Y 1.1.23) F8100 WES Expansion Box 2026 Multiple Vendors / Various C / FFP DLA Jun 2026 Jun 2027 333 37,768.77 Y 1.1.23) F8100 WES Expansion Box 2027 Multiple Vendors / Various C / TBD DLA Jun 2027 Jun 2028 341 38,900.29 Y 2021 SAIC / Bedford, IN C / FFP NAVSEA Sep 2021 Sep 2024 15 1,027K Y 2022 SAIC / Bedford, IN C / FFP NAVSEA Aug 2022 Aug 2025 5 1,290K Y 1.1.24) F8100 Replacement Warshot Afterbodies (†) 1.1.24) F8100 Replacement Warshot Afterbodies (†) Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Method/Type or Funding Vehicle Cost Elements (†) O O C P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 33 of 38 P-1 Line #36 Volume 1 - 475 === page 516 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.24) F8100 Replacement Warshot Afterbodies 1 2021 NAVY 15 0 15 1 2022 NAVY 5 0 5 A - 15 5 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 476 === page 517 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.24) F8100 Replacement Warshot Afterbodies 1 2021 NAVY 15 0 15 1 2022 NAVY 5 0 5 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L - - - - - - - - - - - - - - 15 A - - - - - - - - - - - - - - 5 A U G UNCLASSIFIED Page 35 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 477 === page 518 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.24) F8100 Replacement Warshot Afterbodies 1 2021 NAVY 15 0 15 - - - - - - - - - - - 15 1 2022 NAVY 5 0 5 - - - - - - - - - - - - O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 36 of 38 S E P 0 O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L 5 A U G 0 S E P Volume 1 - 478 === page 519 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.24) F8100 Replacement Warshot Afterbodies 1 2021 NAVY 15 15 0 1 2022 NAVY 5 5 0 0 0 O C T LI 3301 - Torpedo Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 37 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 479 === page 520 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3301 / Torpedo Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 Item Number / Title [DODIC]: 3 / Heavyweight Torpedo Support Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 SAIC - Bedford, IN 1-8-5 For 2027 MAX For 2027 100 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 36 Total After Oct 1 ALT Prior to Oct 1 36 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 17 17 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3301 - Torpedo Support Equipment Navy UNCLASSIFIED Page 38 of 38 P-1 Line #36 Volume 1 - 480 === page 521 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 3: Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3302 / ASW Range Support Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 79.766 4.039 4.328 4.438 0.000 4.438 4.474 4.565 4.648 - - - - - - - - - 79.766 4.039 4.328 4.438 0.000 4.438 4.474 4.565 4.648 - - - - - - - - - 79.766 4.039 4.328 4.438 0.000 4.438 4.474 4.565 4.648 To FY 2031 Complete 4.742 Continuing - Continuing - 4.742 Continuing - Total - Continuing - - 4.742 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Anti-Submarine Warfare (ASW) Range program provides test and training tracking equipment for both Contiguous United States (CONUS) and Outside Contiguous United States (OCONUS). This equipment is used for ground truth tracking of participants during Fleet training exercises and torpedo firings and directly supports reconstruction and analysis for Undersea Warfare (USW) proficiency assessment and test, evaluation & analysis. The infrastructure supported includes: Southern California Offshore Range (SCORE), Barking Sands Tactical Underwater Range/Barking Sands Underwater Range Extension (BARSTUR/BSURE), Pacific Northwest Range Complex (Dabob and Nanoose), Atlantic Undersea Test and Evaluation Center (AUTEC), Portable Offshore Training Range (POTR), Portable Undersea Training Range (PUTR) and other portable capabilities abroad in support of Forward Deployed Naval Forces (FDNF) training requirements. [P5 / ]: The Underwater Tracking Range Equipment (UTRE) Program provides pinger systems for tracking on the Navy's Undersea Fleet Training and Test & Evaluation Ranges. The program provides equipment, installation, and upgrading and modernization of UTRE systems for fleet exercises at the Atlantic Undersea Test & Evaluation Center (AUTEC), Southern California Offshore Range Extension (SCORE), Barking Sands Tactical Underwater Range (BARSTUR), Barking Sands Underwater Ranges Expansion, and Jacksonville Shallow Water Training Range (JSWTR). In addition, this budget is for production engineering and product improvement efforts for the tracking instrumentation the Navy's underwater readiness training. The MK28 Service Weapon Target Test (SWTT) provides the Navy the capability to test the explosive train of torpedoes and the reliability of the torpedo warhead. The funding is for equipment, installation, and upgrading and modernization of MK28 systems. This funding is associated with Replenishment Spares JCRF4 ASW Range Support (J3302) for the UTRE and MK28 Programs. [P5 / F4001 - UTRE/PINGER EXERCISE EQUIPMENT]: Underwater tracking equipment is placed in weapons and other underwater vehicles for tracking during training and Test and Evaluation (T&E) exercises, and to ensure safe operation and movement of all craft and weapons on fixed and portable ranges. Funding is used to procure equipment for T&E exercises in addition to improvement and modernization projects. Production engineering requirements are performed by a field activity or contractor during the production phase of these projects and Product improvement requirements are for fixed and portable range and fleet equipment. [P5 / F4006 - STATIONARY TARGET EQUIPMENT MK28]: The stationary target equipment includes the MK 28 Targets and all equipment used for conducting Service Weapons Tests (SWT) on in-service and advanced war-shot torpedoes. The SWT is the only test the Navy has to verify the explosive train of lightweight and heavyweight torpedoes. Funding is used to procure target systems and equipment for SWT in addition to improvement and modernization projects. [P5 / Support]: Funding for production engineering and product improvement. LI 3302 - ASW Range Support Navy UNCLASSIFIED Page 1 of 3 P-1 Line #37 Volume 1 - 481 === page 522 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 3: Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3302 / ASW Range Support Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / ASW Range Support [F4001] - / 79.766 - / 4.039 - / 4.328 - / 4.438 - / 0.000 - / 4.438 P-40 Total Gross/Weapon System Cost - / 79.766 - / 4.039 - / 4.328 - / 4.438 - / 0.000 - / 4.438 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The Anti-Submarine Warfare (ASW) Range program provides underwater tracking equipment and fleet equipment for use on underwater fixed and portable ranges and for equipment for the Mk28 Service Weapon Target Test. Increase from FY 2026 to FY 2027 includes modernization of the Mk28 Airborne Tactically Integrated Sensors (A-TIS) computer system used for portable tracking and modernization UTRE MK84 Mod 3 logic board to replace obsolete Mod 3 logic boards for torpedo and vehicle customers during Fleet testing and training events. LI 3302 - ASW Range Support Navy UNCLASSIFIED Page 2 of 3 P-1 Line #37 Volume 1 - 482 === page 523 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3302 / ASW Range Support Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ASW Range Support [F4001] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 79.766 4.039 4.328 4.438 0.000 4.438 - - - - - - 79.766 4.039 4.328 4.438 0.000 4.438 - - - - - - 79.766 4.039 4.328 4.438 0.000 4.438 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) F4001 - UTRE/ PINGER EXERCISE EQUIPMENT - - 38.588 - - 2.047 - - 3.085 - - 3.125 - - - - - 3.125 1.1.2) F4006 STATIONARY TARGET EQUIPMENT MK28 - - 24.917 - - 1.186 - - 1.243 - - 1.313 - - - - - 1.313 Subtotal: Recurring Cost - - 63.505 - - 3.233 - - 4.328 - - 4.438 - - - - - 4.438 - - 63.505 - - 3.233 - - 4.328 - - 4.438 - - - - - 4.438 2.1) F4830 PRODUCTION ENGINEERING - UTRE - - 8.603 - - 0.403 - - - - - - - - - - - - 2.2) F4850 - PRODUCT IMPROVEMENT - UTRE - - 7.658 - - 0.403 - - - - - - - - - - - - Subtotal: Support Cost - - 16.261 - - 0.806 - - - - - - - - - - - - Gross/Weapon System Cost - - 79.766 - - 4.039 - - 4.328 - - 4.438 - - 0.000 - - 4.438 Subtotal: Hardware Cost Support Cost LI 3302 - ASW Range Support Navy UNCLASSIFIED Page 3 of 3 P-1 Line #37 Volume 1 - 483 === page 524 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 484 === page 525 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 4: Destination Transportation ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2410 / First Destination Transportation Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 57.075 5.669 5.346 6.011 0.000 6.011 7.308 7.442 10.210 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 57.075 5.669 5.346 6.011 0.000 6.011 7.308 7.442 10.210 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - - - - - - - - 57.075 5.669 5.346 6.011 0.000 6.011 7.308 7.442 10.210 To FY 2031 Complete 10.450 Continuing - Continuing - 10.450 Continuing - Total - Continuing - - 10.450 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: First Destination Transportation (FDT) delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of War (DoW) supply system or a DoW activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navyowned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification. LI 2410 - First Destination Transportation Navy UNCLASSIFIED Page 1 of 3 P-1 Line #38 Volume 1 - 485 === page 526 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 4: Destination Transportation ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2410 / First Destination Transportation Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / FIRST DESTINATION TRANSPORTATION (FDT) - / 57.075 - / 5.669 - / 5.346 - / 6.011 - / 0.000 - / 6.011 P-40 Total Gross/Weapon System Cost - / 57.075 - / 5.669 - / 5.346 - / 6.011 - / 0.000 - / 6.011 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds are required for transportation costs for shipments of WPN-procured weapons related equipment and material to the first point of use or storage, or as Government Furnished Equipment/ Government Furnished Material (GFE/GFM) provided to a contractor incident to a WPN-funded system/equipment acquisition or modification. LI 2410 - First Destination Transportation Navy UNCLASSIFIED Page 2 of 3 P-1 Line #38 Volume 1 - 486 === page 527 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2410 / First Destination Transportation Appropriation / Budget Activity / Budget Sub Activity: 1507N / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / FIRST DESTINATION TRANSPORTATION (FDT) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 57.075 5.669 5.346 6.011 0.000 6.011 - - - - - - 57.075 5.669 5.346 6.011 0.000 6.011 - - - - - - 57.075 5.669 5.346 6.011 0.000 6.011 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support Cost 1.1) First Destination Transportation-NAVSUP - - 11.034 - - - - - - - - - - - - - - - 1.2) First Destination Transportation - NAVAIR - - 19.363 - - 1.971 - - 2.023 - - 2.131 - - - - - 2.131 1.3) First Destination Transportation - NAVSEA - - 10.833 - - 1.510 - - 1.088 - - 1.609 - - - - - 1.609 1.4) First Destination Transportation - SSP - - 15.845 - - 2.188 - - 2.235 - - 2.271 - - - - - 2.271 Subtotal: Support Cost - - 57.075 - - 5.669 - - 5.346 - - 6.011 - - - - - 6.011 Gross/Weapon System Cost - - 57.075 - - 5.669 - - 5.346 - - 6.011 - - 0.000 - - 6.011 (1) (2) Footnotes: (1) (2) FY 2026 to FY 2027 increase of $108 thousand is due to increased transportation costs associated with the trucking and rail service. FY 2026 to FY 2027 increase of $521 thousand is due to increased transportation costs associated with trucking and rail services. LI 2410 - First Destination Transportation Navy UNCLASSIFIED Page 3 of 3 P-1 Line #38 Volume 1 - 487 === page 528 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 488 === page 529 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 1: Guns and Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 195.259 195.259 195.259 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 21.318 9.987 13.946 0.000 13.946 25.135 18.330 18.647 19.024 - - - - - - - - - - - 21.318 9.987 13.946 0.000 13.946 25.135 18.330 18.647 19.024 - - - - - - - - - - - 21.318 9.987 13.946 0.000 13.946 25.135 18.330 18.647 19.024 - 0.510 Continuing Total 321.646 321.646 321.646 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.227 0.497 0.516 - 0.516 0.235 0.434 0.498 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: 4129 Small Arms and Weapons: Provides for the initial procurement, force-wide inventory sustainment and standardization, and modernization of US Navy service-common weapon systems and associated weapon equipment, to include required gun mounts and sights. These service-common weapon systems and equipment support force-wide training and security (ashore and afloat), foreign internal defense, peacekeeping missions, and global combat operations. This line supports Naval Special Warfare Command (NAVSPECWARCOM) and Navy Expeditionary Combat Command (NECC). Future Years Defense Program (FYDP) funding supports service-common weapon and equipment inventory objectives, as well as transportation and production engineering costs. FYDP funding supports the standardization and modernization of: Pistols, Carbines (Rifles) and Carbine Sights, Shotguns, Heavy Machine Guns and Heavy Machine Gun Sights, Grenade Launchers, Mortars, Rocket Launchers and Fire Control Systems, Gun Mounts, and Remote Weapons Systems. Provides for the procurement of initial weapons systems outfitting on T-AGSE's in support of Nuclear Weapons Surety. T-AGSE provide a critical armed escort component to the Strategic Systems Programs Transit Protection Program tasked with protecting Ship, Submersible, Ballistic, Nuclear (SSBNs) transiting to and from their dive point. [P5 - 3 / SSBN Armed Escort Weapon System]: Strategic Systems Programs utilizes armed escort vessels (T-AGSEs) to protect SSBNs transiting to and from homeport. Strategic Systems Programs is adding two additional T-AGSEs to its Transit Protection Program. Funding is required for initial outfitting of weapons systems on these vessels in order to meet escort mission requirements. LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 1 of 20 P-1 Line #39 Volume 1 - 489 === page 530 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 1: Guns and Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / EXPEDITIONARY WARFARE P-5a, P-21 - / 109.543 - / 15.633 - / 5.357 - / 6.300 - / 0.000 - / 6.300 P-5 2 / SURFACE WARFARE P-5a, P-21 - / 85.716 - / 5.685 - / 4.630 - / 7.195 - / 0.000 - / 7.195 P-5 3 / STRATEGIC SYSTEMS PROGRAMS - / 0.000 - / 0.000 - / 0.000 - / 0.451 - / 0.000 - / 0.451 P-40 Total Gross/Weapon System Cost / 195.259 - / 21.318 - / 9.987 - / 13.946 - / 0.000 - / 13.946 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding in FY 2027 supports meeting service-common Small Arms inventory objectives, associated transportation, and production engineering for all US Navy forces including Naval Special Warfare and Naval Expeditionary Combat Command. Funding supports all service-common Small Arms weapons systems including pistols, rifles, shotguns, machine guns, grenade launchers, mortars, rocket launchers, gun mounts, optics, visual augmentation systems and associated equipment. Beginning in FY 2028, the USN will begin phasing in new material solution for medium machine gun capability currently identified as .338 MMG (medium machine gun) which will replace the current M240B which is currently satisfying that capability. The TOA is a total of 5,000. The .338 MMG carries a significantly higher individual cost than the current solution of approx. $30k ea." Provides for the procurement of initial weapons systems outfitting on T-AGSE's in support of Nuclear Weapons Surety. T-AGSE provide a critical armed escort component to the Strategic Systems Programs Transit Protection Program tasked with protecting SSBNs transiting to and from their dive point. Funding for SSBN Armed Escort Weapon System increases by 0.451M in FY 2027 for initial procurement of gun system mounts for two T-AGSE vessels. LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 2 of 20 P-1 Line #39 Volume 1 - 490 === page 531 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 15.633 5.357 6.300 0.000 6.300 - Gross/Weapon System Cost ($ in Millions) 109.543 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 109.543 Plus CY Advance Procurement ($ in Millions) - - - - - 15.633 5.357 6.300 0.000 6.300 - Total Obligation Authority ($ in Millions) 109.543 FY 2027 Total - - - - - 15.633 5.357 6.300 0.000 6.300 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) ASR/ MRAD .300 PRC/ 13,505.84 (†) (1) Mk22 1.1.2) URG 14.5 3.471 17,000.00 3.791 - 0.000 1.050 17,000.00 184 3.128 - - 0.000 - - 0.000 17,000.00 246 4.182 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 17,000.00 246 4.182 - - 0.000 - - 0.000 - 0.163 57 18.304 1.1.4) FCS13RE (MAAWS) 28,000.00 31 0.868 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) MORTAR, 60MM, M8A1, BASEPLATE 6,571.43 35 0.230 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) RIFLE/ CARBINE SIGHT (SCO) 1,642.12 6,002 9.856 344 0.729 442 0.955 522 1.138 - - 0.000 522 1.138 3,400.00 3,480 11.832 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 25,000.00 16 0.400 643 7.395 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.9) 14.5 URG KIT 780.00 2,100 1.638 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 46.762 - - 12.965 - - 4.083 - - 5.320 - - 0.000 - - 5.320 - - 46.762 - - 12.965 - - 4.083 - - 5.320 - - 0.000 - - 5.320 (†) (2) 1.1.7) MACHINE GUN (†) SIGHT (MMO) 1.1.8) AN/PVS-31B, INDIVIDUAL NVGs Subtotal: Flyaway Cost (3) - 223 321,122.81 1.1.3) CROWS II - 257 350,000.00 2,120.00 11,500.00 3 2,160.00 2,180.00 2,180.00 Hardware - EXPEDITIONARY WARFARE Cost Recurring Cost LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 3 of 20 P-1 Line #39 Volume 1 - 491 === page 532 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.1.1) SSAM/MK50 Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 555,333.33 9 4.998 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.2) MK48 8,729.41 85 0.742 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.3) MK48 REFURB 5,942.86 35 0.208 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.4) M107 .50 CAL SNIPER RIFLE 12,500.00 2 0.025 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.5) M11 9MM PISTOL 700.00 40 0.028 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.6) M9 9MM PISTOL 6,855.63 284 1.947 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.7) MK44 7.62MM MINIGUN 360,750.00 8 2.886 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.8) MK44 REFURB 40,666.67 3 0.122 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.9) EXPEDITIONARY MOUNTS 2,750.00 40 0.110 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.10) MK-19 MOD 3 40MM GMG 17,111.11 9 0.154 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4,882.70 2,191 10.698 850.00 400 0.340 875.00 701 0.613 900.00 400 0.360 - - 0.000 900.00 400 0.360 43,155.00 200 8.631 12,650.00 111 1.404 13,000.00 50 0.650 13,000.00 47 0.611 - - 0.000 13,000.00 47 0.611 14,418.88 339 4.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 7.277 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 76,458.33 48 3.670 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 200.04 11,348 2.270 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 50,454.55 55 2.775 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.20) M3E1 Carl Gustaf 64,741.94 124 8.028 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.21) M3E1 20mm sub caliber adapter 6,811.11 90 0.613 82 0.410 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.22) SU-255 Small Arms Optics 30,000.00 29 0.870 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 60.940 - - 2.154 - - 1.263 - - 0.971 - - 0.000 - - 0.971 - - 60.940 - - 2.154 - - 1.263 - - 0.971 - - 0.000 - - 0.971 2.1.11) M4A1 5.56MM CARBINE (4) 2.1.12) M240B (†) (5) 7.62MM MG 2.1.13) M2A1 2.1.14) M2A1 COMPONENTS 2.1.15) M224 60MM (†) MORTAR 2.1.16) M18 SERVICE PISTOL 2.1.18) M252 81MM (†) MORTAR Subtotal: Recurring Cost Subtotal: Hardware - EXPEDITIONARY WARFARE Cost - LI 4129 - Small Arms and Weapons Navy 5,000.00 UNCLASSIFIED Page 4 of 20 P-1 Line #39 Volume 1 - 492 === page 533 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - TRANSPORTATION ACCOUNT CODE (TAC) Cost Recurring Cost 3.1.1) SMALL ARMS TAC - - 0.705 - - 0.513 - - 0.003 - - 0.000 - - 0.000 - - 0.000 3.1.2) Production Engineering - - 1.136 - - 0.001 - - 0.008 - - 0.009 - - 0.000 - - 0.009 Subtotal: Recurring Cost - - 1.841 - - 0.514 - - 0.011 - - 0.009 - - 0.000 - - 0.009 Subtotal: Hardware TRANSPORTATION ACCOUNT CODE (TAC) Cost - - 1.841 - - 0.514 - - 0.011 - - 0.009 - - 0.000 - - 0.009 Gross/Weapon System Cost - - 109.543 - - 15.633 - - 5.357 - - 6.300 - - 0.000 - - 6.300 (†) indicates the presence of a P-5a Footnotes: (1) The Mk22 represents the latest advancement in precision rifle technology and is the new service common material solution to replace the legacy precision rifle systems across the Department of the Navy. Due to its high unit cost, funding profiles remain low and FOC will exceed beyond the FYDP. This plus up will support modernization at an increased rate allowing the US Navy to improve lethality and meet ongoing fielding requirements and annual replacement rates. (2) CROWS II was originally supposed to be installed on a total of 85 JLTVs; however, the requirement was reduced from 85 to 60 CROWS II units. We maintained an annual buy of 14 system per year (or $4.9M max) until complete. FY25 will be the last CROWS II procurement (only 3 systems left to procure) getting us to a total of 60 systems. MK50 Mod 1 (for CCM maritime platform) had a total requirement of 14 systems but was deemed no longer a requirement and canceled prior to production. (3) (4) (5) In FY 2025, I received 7.395M of Ukraine funding to support the replenishment of Naval Special Warfare AN/PVS-31Bs for the replacement of Navy stock. Quantities due to sustainment requirements. Resource sponsor realigned the funds to other Naval Special Warfare program, due to no longer requiring additional CROWS II for the Navy. The realignment allowed the increase of quantities from 40 to 50, to support the procurement schedule. LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 5 of 20 P-1 Line #39 Volume 1 - 493 === page 534 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements O O C 1.1.1) ASR/MRAD .300 PRC/Mk22 1.1.1) ASR/MRAD .300 PRC/Mk22 1.1.1) ASR/MRAD .300 PRC/Mk22 1.1.1) ASR/MRAD .300 PRC/Mk22 (†) P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 Barrett Manufacturing / Murfreesboro, TN C / TBD ** NO PCO ** Oct 2023 Apr 2025 86 16,500.00 Y 2025 Barrett Manufacturing / Murfreesboro, TN C / TBD ** NO PCO ** Oct 2024 Apr 2026 223 17,000.00 Y 2026 Barrett Manufacturing / Murfreesboro, TN C / TBD ** NO PCO ** Oct 2025 Apr 2027 184 17,000.00 Y 2027 Barrett Manufacturing / Murfreesboro, TN C / TBD ** NO PCO ** Oct 2026 Apr 2028 246 17,000.00 Y (Each) 1.1.3) CROWS II (†) 2023 KONGSBERG / Jonhstown, PA C / FFP PICATINNY NJ Apr 2023 Oct 2024 14 350,000.00 Y 1.1.3) CROWS II (†) 2024 KONGSBERG / Jonhstown, PA C / CPFF PICATINNY NJ Apr 2024 Apr 2027 14 350,000.00 Y 1.1.7) MACHINE GUN SIGHT (MMO) 2024 TRIJICON / Wixom, MI C / IDIQ PICATINNY NJ Oct 2023 Apr 2024 150 3,400.00 Y 2.1.12) M240B 7.62MM MG 2024 FN / COLUMBIA, SC C / TBD ** NO PCO ** Oct 2023 Nov 2025 20 12,650.00 N 2.1.12) M240B 7.62MM MG 2025 FN / COLUMBIA, SC C / TBD ** NO PCO ** Oct 2024 Nov 2026 111 12,650.00 N RFP Issue Date 2.1.15) M224 60MM MORTAR ✓ 2019 Connectec Co. Inc / Irvin, CA C / IDIQ PICATINNY Jan 2019 Jan 2019 22 70,000.00 N Oct 2018 2.1.18) M252 81MM MORTAR ✓ 2018 Connectec Co. Inc / Irvin, CA C / FFP PICATINNY Jan 2018 Jan 2018 30 50,000.00 Y Oct 2017 indicates the presence of a P-21 LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 6 of 20 P-1 Line #39 Volume 1 - 494 === page 535 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.3) CROWS II PROC QTY Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Fiscal Year 2019 Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) Prior Years Deliveries: 29 1 2023 NAVY 14 0 14 1 2024 NAVY 14 0 14 14 14 O C T LI 4129 - Small Arms and Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 495 === page 536 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.3) CROWS II PROC QTY Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) Prior Years Deliveries: 29 1 2023 NAVY 14 0 14 1 2024 NAVY 14 0 14 14 14 O C T LI 4129 - Small Arms and Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 496 === page 537 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.3) CROWS II PROC QTY Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) Prior Years Deliveries: 29 1 2023 NAVY 14 0 14 1 2024 NAVY 14 0 14 A - - - - - 14 14 O C T LI 4129 - Small Arms and Weapons Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 497 === page 538 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.3) CROWS II PROC QTY Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) Prior Years Deliveries: 29 1 2023 NAVY 14 0 14 1 2024 NAVY 14 0 14 O C T LI 4129 - Small Arms and Weapons Navy N O V D E C J A N F E B M A R - - - - - - 14 A - - - - - - - A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 20 S E P O C T 0 N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G - 14 S E P Volume 1 - 498 === page 539 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.3) CROWS II PROC QTY Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) Prior Years Deliveries: 29 1 2023 NAVY 14 14 0 1 2024 NAVY 14 0 14 0 O C T LI 4129 - Small Arms and Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R 14 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 499 === page 540 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Item Number / Title [DODIC]: 1 / EXPEDITIONARY WARFARE Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 KONGSBERG - Jonhstown, PA 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 18 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 18 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 12 of 20 P-1 Line #39 Volume 1 - 500 === page 541 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / SURFACE WARFARE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 85.716 5.685 4.630 7.195 0.000 7.195 - - - - - - 85.716 5.685 4.630 7.195 0.000 7.195 - - - - - - 85.716 5.685 4.630 7.195 0.000 7.195 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - SURFACE WARFARE Cost Recurring Cost 1.1.1) MK44 REFURB 41,000.00 1 0.041 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) M590A1 12 GAUGE SHOTGUN 500.00 6,504 3.252 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) 2,535.35 2,645 6.706 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) M240B 7.62MM MG 75,653.74 361 27.311 50 0.632 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) M9 9MM PISTOL 9,717.39 230 2.235 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) M2HB REFURB/M2A1 QCB CONVO KITS 5,985.29 340 2.035 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) M2A1 COMPONENTS 27,275.68 555 15.138 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 200.00 56,900 11.380 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2,000.00 1,087 2.174 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,695.88 4,873 8.264 2,383 5.052 2,143 4.629 3,300 7.194 - - 0.000 3,300 7.194 3,481.17 1,195 4.160 - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 1.1.3) M4A1 5.56MM CARBINE 1.1.8) M18 SERVICE PISTOL 1.1.9) M320A1 40MM GRENADE LAUNCHER 1.1.10) RIFLE/ CARBINE SIGHT (SCO) (†) (6) 1.1.11) MACHINE (†) GUN SIGHT (MMO) LI 4129 - Small Arms and Weapons Navy 12,649.00 2,120.00 - 2,160.00 - UNCLASSIFIED Page 13 of 20 2,180.00 - P-1 Line #39 2,180.00 - Volume 1 - 501 === page 542 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / SURFACE WARFARE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 82.696 - - 5.684 - - 4.629 - - 7.194 - - 0.000 - - 7.194 Subtotal: Hardware SURFACE WARFARE Cost - - 82.696 - - 5.684 - - 4.629 - - 7.194 - - 0.000 - - 7.194 Hardware - TRANSPORTATION ACCOUNT CODE (TAC) Cost Recurring Cost 2.1.1) SMALL ARMS TAC - - 0.603 - - 0.001 - - 0.001 - - 0.001 - - 0.000 - - 0.001 Subtotal: Recurring Cost - - 0.603 - - 0.001 - - 0.001 - - 0.001 - - 0.000 - - 0.001 - - 0.603 - - 0.001 - - 0.001 - - 0.001 - - 0.000 - - 0.001 3.1) PRODUCTION ENGINEERING - - 2.417 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support SURFACE WARFARE Cost - - 2.417 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 85.716 - - 5.685 - - 4.630 - - 7.195 - - 0.000 - - 7.195 Subtotal: Hardware TRANSPORTATION ACCOUNT CODE (TAC) Cost Support - SURFACE WARFARE Cost (†) indicates the presence of a P-5a Footnotes: (6) The increase in Rifle/Carbine Sight (SCO) procurements in FY 2027 is directly attributed to the Approved Acquisition Objective (AAO) of 46,000 M83 SCOs (1:1 to combat rifles) and combat capability to the fleet. LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 14 of 20 P-1 Line #39 Volume 1 - 502 === page 543 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements 1.1.3) M4A1 5.56MM CARBINE 1.1.10) RIFLE/CARBINE SIGHT (†) (SCO) 1.1.10) RIFLE/CARBINE SIGHT (†) (SCO) 1.1.10) RIFLE/CARBINE SIGHT (†) (SCO) 1.1.10) RIFLE/CARBINE SIGHT (†) (SCO) 1.1.10) RIFLE/CARBINE SIGHT (†) (SCO) 1.1.11) MACHINE GUN SIGHT (MMO) (†) O O C P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Item Number / Title [DODIC]: 2 / SURFACE WARFARE FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2024 COLT / HARTFORD, CT C / CPAF ** NO PCO ** Dec 2023 Jan 2025 100 825.00 Y 2023 TRIJICON / Wixom, MI MIPR Quantico, VA Jan 2023 Jul 2024 2,398 1,500.00 Y 2024 TRIJICON / Wixom, MI MIPR Quantico, VA Dec 2023 Jun 2025 1,725 2,075.00 Y 2025 TRIJICON / Wixom, MI MIPR Quantico, VA Dec 2024 Jun 2026 2,383 2,120.00 Y 2026 TRIJICON / Wixom, MI MIPR Quantico, VA Dec 2025 Jun 2027 2,143 2,160.00 Y 2027 TRIJICON / Wixom, MI MIPR Quantico, VA Dec 2026 Jun 2028 3,300 2,180.00 Y 2024 TRIJICON / Wixom, MI C / FFP ** NO PCO ** Jan 2024 Jul 2025 610 3,600.00 Y Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 15 of 20 P-1 Line #39 Volume 1 - 503 === page 544 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / SURFACE WARFARE Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.10) RIFLE/CARBINE SIGHT (SCO) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (6) Prior Years Deliveries: 750 1 2023 NAVY 2,398 0 2,398 1 2024 NAVY 1,725 0 1,725 A - 1 2025 NAVY 2,383 0 2,383 2,383 1 2026 NAVY 2,143 0 2,143 2,143 1 2027 NAVY 3,300 0 3,300 - - - - - - - - - - - - - - - - 2,398 A - - - - - - - - 0 - - 1,725 3,300 O C T LI 4129 - Small Arms and Weapons Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 504 === page 545 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / SURFACE WARFARE Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.10) RIFLE/CARBINE SIGHT (SCO) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (6) Prior Years Deliveries: 750 1 2023 NAVY 2,398 2,398 0 1 2024 NAVY 1,725 0 1,725 1 2025 NAVY 2,383 0 2,383 1 2026 NAVY 2,143 0 2,143 1 2027 NAVY 3,300 0 3,300 0 - - - - - - - 1,725 A - - - - - - - 0 - - - - - - - - - - - 2,383 A - - - - - - - 0 - - - 2,143 3,300 O C T LI 4129 - Small Arms and Weapons Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 505 === page 546 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / SURFACE WARFARE Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.10) RIFLE/CARBINE SIGHT (SCO) Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (6) Prior Years Deliveries: 750 1 2023 NAVY 2,398 2,398 0 0 1 2024 NAVY 1,725 1,725 0 0 1 2025 NAVY 2,383 2,383 0 1 2026 NAVY 2,143 0 2,143 1 2027 NAVY 3,300 0 3,300 0 O C T LI 4129 - Small Arms and Weapons Navy N O V - - - - - - 2,143 A - - - - - - - D E C J A N F E B M A R A P R M A Y J U N 0 J U L A U G UNCLASSIFIED Page 18 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y 3,300 J U N 0 J U L A U G S E P Volume 1 - 506 === page 547 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Item Number / Title [DODIC]: 2 / SURFACE WARFARE Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 TRIJICON - Wixom, MI 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 18 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 18 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 19 of 20 P-1 Line #39 Volume 1 - 507 === page 548 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4129 / Small Arms and Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / STRATEGIC SYSTEMS PROGRAMS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 0.000 0.000 0.451 0.000 0.451 - - - - - - 0.000 0.000 0.000 0.451 0.000 0.451 - - - - - - 0.000 0.000 0.000 0.451 0.000 0.451 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) SSBN Armed Escort Weapon System (7) Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.000 225,500.00 2 0.451 - - 0.000 225,500.00 2 0.451 - - 0.000 - - 0.000 - - 0.000 - - 0.451 - - 0.000 - - 0.451 Subtotal: Hardware Cost - - 0.000 - - 0.000 - - 0.000 - - 0.451 - - 0.000 - - 0.451 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 0.451 - - 0.000 - - 0.451 Footnotes: (7) Funding for SSBN Armed Escort Weapon System increases by 0.451M in FY27 for initial procurement of Mk48 cables required in order to allow outfitting of gun system mounts for two T-AGSE vessels. LI 4129 - Small Arms and Weapons Navy UNCLASSIFIED Page 20 of 20 P-1 Line #39 Volume 1 - 508 === page 549 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4205 / Close-In Wpns Sys (CIWS) Mods of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,855.095 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,855.095 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,855.095 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 5.118 8.122 7.939 0.000 7.939 7.969 7.981 8.127 - - - - - - - - 5.118 8.122 7.939 0.000 7.939 7.969 7.981 8.127 - - - - - - - - 5.118 8.122 7.939 0.000 7.939 7.969 7.981 8.127 To FY 2031 Complete 8.289 Continuing - Continuing - 8.289 Continuing - Total - Continuing - - 8.289 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Phalanx Close-In Weapon System (CIWS) is an autonomous combat system that searches, detects, tracks (radar and electro-optic), and engages threats with a 20mm Gatling gun capable of firing 4,500 tungsten penetrator rounds per minute. Integral to ship self-defense and the anti-air warfare "defense-in-depth" concept, CIWS provides terminal defense against anti-ship missiles and high-speed aircraft penetrating other fleet defenses. Phalanx CIWS can operate autonomously or be integrated with a ship's combat system. The CIWS Block 1B configuration provides further defense against asymmetric threats such as small, fast surface craft, low slow-flying fixed and rotary-winged aircraft and unmanned aerial vehicles through the addition of an integrated Forward-Looking Infra-Red (FLIR) sensor. Block 1B also incorporates an Optimized Gun Barrel (OGB) for tighter ordnance dispersion. Enhanced Lethality Cartridges (ELC) can be used with the OGB for improved target penetration. The MK 15 MOD 40 CIWS RAM Defense Capability (CRDC) configuration is fielded aboard select Nimitz Class Carriers (CVN). It is a fast reaction, rapid fire, computer-controlled radar system that employs the Rolling Airframe Missiles (RAM) as an effector for Anti-Ship Missile (ASM) defense. The latest RAM missile variant (Block 2B) defends against highly maneuverable Anti-Ship Cruise Missile (ASCM) threats and emerging complex raid attacks utilizing an advanced infrared (IR) seeker and Missile-to-Missile Link (MML) while maintaining all the proven capabilities of previous RAM variants: accurate terminal guidance, proven lethality, and post-launch fire and forget capability. [P5 / DT001 CIWS BLOCK 1B]: This budget provides for hardware procurements to address safety, obsolescence, and reliability improvements. There are 237 U.S. (USN/USCG) shipboard systems, 8 trainers, and 3 Engineering Development Module (EDM)/Periodic Conformance Inspection (PCI) mounts. [P5 / DT001 CIWS (CRDC) MK 15 MOD 40]: Funding supports MK 15 MOD 40 hardware procurement and installation of Ordnance Alterations (ORDALT) to address safety, obsolescence, and reliability. LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 1 of 10 P-1 Line #40 Volume 1 - 509 === page 550 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4205 / Close-In Wpns Sys (CIWS) Mods of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Close-In Wpns Sys (CIWS) Mods - / 522.654 - / 5.118 - / 8.122 - / 7.939 - / 0.000 - / 7.939 P-3a 1 / Block 1B Baseline 2 Radar Upgrades (ECP/ORDALT) - / 187.359 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / CIWS Block 1 B (Phalanx CIWS Block 1) - / 1,145.082 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 1,855.095 - / 5.118 - / 8.122 - / 7.939 - / 0.000 - / 7.939 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Close-In Wpns Sys (CIWS) Mods P-3a 1 / Block 1B Baseline 2 Radar Upgrades (ECP/ORDALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / CIWS Block 1 B (Phalanx CIWS Block 1) - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 7.969 - / 7.981 - / 8.127 - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 / 8.289 Continuing - / / 187.359 / 1,145.082 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding continues procurements of corrective action and reliability ORDALTs for the MK 15 MOD 40 CRDC sensor. It also continues 10 procurements for the Gun Ammo Handling System (GAHS) and Electronic Gun Drive (E-Gun) ORDALTs. The GAHS ORDALT improves system operational availability and reliability by introducing a modified design with improved materials for components that are prone to fatigue and causing ammo handling jams. The E-Gun ORDALT replaces the pneumatic gun drive components with an electric drive system providing an increased number of engagements thru better control of fire rates and a reduced rate of fire variability. It also reduces maintenance hours, improves Built-In Test (BIT) and troubleshooting, increases reliability by eliminating high failure pneumatic components and reduces gun jams. The CRDC reliability ORDALTs increase reliability of the CRDC sensor. The sensor is the primary reliability degrader of the system and corrective actions are necessary to achieve the systems required operational availability. CRDC corrective action and reliability improvement kit procurements (two ship sets) include the Local Oscillator (LO), Transformer Rectifier Unit (TRU), Active Electronically Scanned Array (AESA) Radar Interface (ARI) and Radar Power Supply (RPS). LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 2 of 10 P-1 Line #40 Volume 1 - 510 === page 551 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Close-In Wpns Sys (CIWS) Mods MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.118 8.122 7.939 0.000 7.939 - Gross/Weapon System Cost ($ in Millions) 522.654 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 522.654 Plus CY Advance Procurement ($ in Millions) - - - - - 5.118 8.122 7.939 0.000 7.939 - Total Obligation Authority ($ in Millions) 522.654 FY 2027 Total - - - - - 5.118 8.122 7.939 0.000 7.939 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) MK 15 MOD 40 Configuration ORDALT (1) Subtotal: Recurring Cost Subtotal: Flyaway Cost - - 0.000 - - 0.000 1,778K - - 0.000 - - 0.000 - - - 0.000 - - 0.000 - 2 3.557 1,810K - 3.557 - - 3.557 - 2 3.620 - - 0.000 1,810K 2 3.620 - 3.620 - - 0.000 - - 3.620 - 3.620 - - 0.000 - - 3.620 Hardware - DT001 CIWS BLOCK 1B Cost Recurring Cost 2.1.1) ECP/ORDALT - - 384.287 - - 0.415 - - 0.239 - - 0.255 - - 0.000 - - 0.255 2.1.2) Gun Ammo Handling System ORDALT - - 0.000 - - 0.451 - - 0.507 - - 0.470 - - 0.000 - - 0.470 2.1.3) EGUN ORDALT - - 0.000 - - 4.252 - - 3.819 - - 3.594 - - 0.000 - - 3.594 Subtotal: Recurring Cost - - 384.287 - - 5.118 - - 4.565 - - 4.319 - - 0.000 - - 4.319 Subtotal: Hardware - DT001 CIWS BLOCK 1B Cost - - 384.287 - - 5.118 - - 4.565 - - 4.319 - - 0.000 - - 4.319 Hardware - DT001 CIWS (CRDC) MK 15 MOD 40 Cost Non Recurring Cost 3.1.1) Sensor Upgrades Subtotal: Non Recurring Cost - - 138.367 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 138.367 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 3 of 10 P-1 Line #40 Volume 1 - 511 === page 552 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Close-In Wpns Sys (CIWS) Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Hardware - DT001 CIWS (CRDC) MK 15 MOD 40 Cost - - 138.367 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 522.654 - - 5.118 - - 8.122 - - 7.939 - - 0.000 - - 7.939 Footnotes: (1) For ORDALTs the hardware production lead time is 24 months and installations are executed in accordance with Ship Maintenance Availability Schedules. LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 4 of 10 P-1 Line #40 Volume 1 - 512 === page 553 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 187.359 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 187.359 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Block 1B Baseline 2 Radar Upgrades 187.359 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 187.359 187.359 187.359 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The CIWS Block 1B Baseline 2 Radar Upgrade (RUG) Kit is required for CGs, CVNs, DDGs, LCCs, LHAs, LHDs, LPDs, LSDs and WMSLs platforms. The CIWS Block IB Baseline 2 RUG kit is new state of the art digital radar that provides improved performance and increased reliability. It mitigates 200 obsolete components inherent in the existing analog radar by introducing advanced COTS-based signal processing coupled with new low noise signal source. It provides a 2x sensitivity increase along with expanded Doppler (velocity) coverage required for detection and tracking of advanced ASCM and asymmetric threats, provides a 10% increase in system level reliability and provides a 15% reduction in sailor man-hours required for CIWS planned system maintenance. LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 5 of 10 P-1 Line #40 Volume 1 - 513 === page 554 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CIWS Block 1B Block 1B Baseline 2 Radar Upgrades Prior Years Financial Plan Modification Number / Title: 1 / Block 1B Baseline 2 Radar Upgrades Modification Type: ECP/ORDALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Block 1B Baseline 2 Radar Upgrades B Kits Recurring 1.1.1) Block 1B Baseline 2 Radar Upgrades - Organic Subtotal: Recurring Subtotal: Block 1B Baseline 2 Radar Upgrades Subtotal: Procurement, All Modification Items 259 / 187.359 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 187.359 - / - - / - - / - - / - - / - - / - - / - - / - - / - 259 / 187.359 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 187.359 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - - / / 0.000 - / / 0.000 - 259 / 187.359 - / 187.359 259 / 187.359 - / 187.359 Installation Subtotal: Installation - - / - - / - 0.000 187.359 Total Total Cost (Procurement + Support + Installation) LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy 187.359 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 6 of 10 0.000 0.000 0.000 P-1 Line #40 0.000 0.000 Volume 1 - 514 === page 555 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Block 1B Baseline 2 Radar Upgrades MDAP/MAIS Code: Modification Item 1 of 1: Block 1B Baseline 2 Radar Upgrades Manufacturer Information Manufacturer Name: Raytheon CO Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 7 of 10 P-1 Line #40 Volume 1 - 515 === page 556 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,145.082 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,145.082 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / CIWS Block 1 B 1,145.082 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 1,145.082 1,145.082 1,145.082 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Block 1B mount includes the addition of a thermal imager, an automatic acquisition video tracker, and stabilization system for the tracker. The upgrade is essential to provide the Fleet capability against small high speed surface threats and low speed air threats. [CIWS Block 1B] Installation schedule reflects the installation of the CIWS Block 1B and the modification kits CIWS Block 1B conversion upgrade. These 2 cost elements are incorporated into the mount at the factory and the complete mount is installed. It also includes eight SeaRAM installations for Rota-based DDGs (in FY 2019-2021) procured under separate budget line items. The budget also provides for the Design Service Allocation (DSA) efforts associated with the planning yard ship checks, Ship Installation Drawing (SID) development, installation on-site support and Ship Selected Record (SSR) updates. LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 8 of 10 P-1 Line #40 Volume 1 - 516 === page 557 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: DT001 CIWS Block 1B CIWS Block 1B Prior Years Financial Plan Modification Number / Title: 2 / CIWS Block 1 B Modification Type: Phalanx CIWS Block 1 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CIWS Block 1 B B Kits Non-Recurring 1.1.1) CIWS Block 1B - NonOrganic 239 / 505.717 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 239 / 505.717 1.1.2) Modifications Kits CIWS Block 1B Conversion and Upgrade - Organic - / 464.686 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 464.686 - - / 970.403 Subtotal: Non-Recurring / 970.403 - / - - / - - / - - / - - / - - / - - / - - / - - / - 239 / 970.403 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 970.403 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 970.403 Modification Item 1 of 1: CIWS Block 1 B - / 174.679 / 0.000 - / 0.000 - / 174.679 Subtotal: Installation - / 174.679 / - - / 0.000 - / 174.679 Subtotal: CIWS Block 1 B Subtotal: Procurement, All Modification Items / 0.000 - / - 239 / 970.403 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy 1,145.082 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 9 of 10 0.000 0.000 0.000 P-1 Line #40 0.000 0.000 0.000 1,145.082 Volume 1 - 517 === page 558 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4205 / Close-In Wpns Sys (CIWS) Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CIWS Block 1 B MDAP/MAIS Code: Modification Item 1 of 1: CIWS Block 1 B Manufacturer Information Manufacturer Name: Raytheon Co Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 26 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Non-Recurring:: Installation Name: BKits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 247 / 174.679 Prior Years 247 / 174.679 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 247 / 174.679 Total 247 / 174.679 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 237 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 237 Out 237 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 237 LI 4205 - Close-In Wpns Sys (CIWS) Mods Navy UNCLASSIFIED Page 10 of 10 P-1 Line #40 Volume 1 - 518 === page 559 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4206 / Coast Guard Weapons of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 426.417 426.417 426.417 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 44.718 44.455 49.537 0.000 49.537 51.620 50.886 51.862 - - - - - - - - 44.718 44.455 49.537 0.000 49.537 51.620 50.886 51.862 To FY 2031 Complete - Total - 52.216 Continuing - Continuing - 52.216 Continuing - Continuing - - - - - - - - - - 44.718 44.455 49.537 0.000 49.537 51.620 50.886 51.862 52.216 Continuing Continuing 0.834 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.749 0.762 0.738 - 0.738 0.791 0.803 0.818 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Coast Guard Weapons line funds the gun weapon systems of the Navy-Type/Navy-Owned Coast Guard Combat System Suite for the United States Coast Guard (USCG) cutters under the Coast Guard Surface Acquisition Program. Under inter-service agreement (delineated in OPNAVINST 4000.79(Series)), Department of Navy (DON) plans, programs, and budgets for specific Navy military equipment, systems and logistic support requirements for Coast Guard units to ensure the Coast Guard is prepared to execute naval warfare tasks in consonance with US Navy units. Ship construction and installation costs are funded under the Department of Homeland Security appropriation. The Combat System Suite including weapons and sensors will be aligned with future naval ship building programs to support commonality among the two service's systems and meet National Fleet objectives. The Combat System Suite must compliment and integrate with Navy Combat Systems. The suite is an appropriate balance of equipment to ensure the Coast Guard is prepared to accomplish the assigned Naval Operational Capabilities in concert with US Navy units. The 57mm MK 110 Gun is the primary weapon system of the Offshore Patrol Cutter (OPC) and National Security Cutter (NSC), and the MK 160 Gun Control System is a required gun control component for each 57mm MK 110 gun mount. The MK 38 Machine Gun System is the primary weapon system of the Fast Response Cutter (FRC), Polar Security Cutter (PSC), Medium Range Endurance Cutters (WMEC) and Arctic Security Cutters (ASC) and secondary AT/FP weapon system for the Offshore Patrol Cutter (OPC). These weapon systems, as well as their integration with the combat systems and sensors of each supported hull, are critical to their self-defense and offensive capabilities. These weapon systems, as well as their integration with the combat systems and sensors of each supported hull, are critical to their selfdefense and offensive capabilities. [P5 / CG002 MK 110 GUN]: Provides the 57mm MK 110 gun to engage surface threats, independently or in cooperation with other forces, achieving mission kill on high-speed coastal patrol craft beyond small and intermediate caliber gunfire effective range. Includes gun mount, equipment procurement, recurring engineering, and ILS support for the United States Coast Guard National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), and the Offshore Patrol Cutter (OPC), aka the Maritime Security Cutter, Medium (WMSM), in accordance with OPNAVINST 4000.79(Series) and the Naval Operational Capabilities (NOC) document. [P5 / CG003 MK 160 GCS]: Provides the MK 160 Gun Computer System (GCS) including equipment procurement, production support, systems engineering, data, and software and test support for the National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), and the Offshore Patrol Cutter (OPC), aka the Maritime Security Cutter, Medium (WMSM). The MK 160 GCS is required to plan and direct surface threat engagements including the capability to fire warning shots, disabling fire and achieve mission kill against these threats in accordance with National Fleet Policy, OPNAVINST 4000.79(Series), and the Naval Operational Capabilities (NOC) document. LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 1 of 24 P-1 Line #41 Volume 1 - 519 === page 560 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4206 / Coast Guard Weapons of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / CG004 MK 38 MACHINE GUN SYSTEMS]: Provides the MK 38 Mod 2/3/4 Machine Gun System (MGS) to plan and engage surface threats, achieving missions kill on high speed patrol craft beyond minor caliber gunfire effective range in accordance with OPNAVINST 4000.79(Series) and the NOC. The MK 38 Mod 3 (vice Mod 2), which began production in FY 2015, permits greater effective range, greater range of elevation to engage air targets, and an improved Toplite electro-optical (EO) system. The MK 38 MGS provides shipboard self-defense against small boat threats and is the main gun of the Fast Response Cutter (FRC), aka Patrol Coastal Cutter (WPC), the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP), and the WMEC 270' classes and secondary gun mount for the Offshore Patrol Cutter (OPC), aka the Maritime Security Cutter, Medium (WMSM). Includes the MK 38 gun mount, Toplite optical sight, M242 cannon, and ancillary components, recurring engineering, outfitting spares, and integrated logistics support (ILS). The MK 38 MGS for the OPC Class will include a 7.62mm MK 52 MOD 0 Coaxial Automatic Gun (COAX ORDALT) for Anti-terrorism / Force Protection (AT/FP) missions in narrow waterways and in-port. [P5 / CG005 GUN WEAPON SYSTEM INTEGRATION]: Ensures successful integration and system interoperability of Navy type equipment that affects the gun weapon systems of USCG National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), the Offshore Patrol Cutter (OPC), aka the Maritime Security Cutter, Medium (WMSM), the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP), and Fast Response Cutters (FRCs). Includes gun weapon system integration support for the OPC ATHENA Control, Correlation & Display (CCD) System which provides target queuing for Gun Weapon System engagements. LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 2 of 24 P-1 Line #41 Volume 1 - 520 === page 561 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4206 / Coast Guard Weapons of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Coast Guard Weapons P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 426.417 - / 44.718 - / 44.455 - / 49.537 - / 0.000 - / 49.537 - / 426.417 - / 44.718 - / 44.455 - / 49.537 - / 0.000 - / 49.537 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding and inter-service agreements are used to procure Navy-Type/Navy-Owned (NT/NO) combat systems, support equipment, Integrated Logistics Support (ILS), certification, test and production support for USCG National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), the Offshore Patrol Cutter (OPC) Class, aka the Maritime Security Cutter, Medium (WMSM) and the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP), Fast Response Cutter (FRC), aka the Patrol Coastal Cutter (WPC), Arctic Security Cutter (ASC) and the 270' Medium Endurance Cutter (WMEC) modernization effort being constructed under the Coast Guard's Surface Acquisition Program. Funding also supports C4I systems and associated logistic support for the Offshore Patrol Cutter. These efforts are ongoing. FY 2027 funds the following Coast Guard Weapon items for USCG cutters: procurement of 57mm MK 110 Guns and associated ILS; procurement of MK 160 Gun Computer Systems and associated support; procurement of MK 38 Machine Gun Systems, associated spares/equipment, MK 38 Upgrade to attach a 7.62mm MK 52 Mod 0 Coaxial Gun and CUAS kits, and associated ILS support; provide integration of Gun Weapon Systems with Combat Systems and Sensors (Gun Weapon System Integration) for all supported hull classes; procure and integrate the ATHENA Control, Correlation & Display (CCD) System on WMSMs and PSCs, which provides target queuing for Gun Weapon System engagements. FY 2027 funding increased by $5.082 million in support of the MK 38 Gun Weapon System (GWS) Arctic Security Cutter (ASC) quantity increase of one (1) to support the ASC in yard need date and increased efforts for United States Coast Guard platform upgrades to reduce operational risk. LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 3 of 24 P-1 Line #41 Volume 1 - 521 === page 562 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Coast Guard Weapons MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 44.718 44.455 49.537 0.000 49.537 - Gross/Weapon System Cost ($ in Millions) 426.417 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 426.417 Plus CY Advance Procurement ($ in Millions) - - - - - 44.718 44.455 49.537 0.000 49.537 - Total Obligation Authority ($ in Millions) 426.417 FY 2027 Total - - - - - 44.718 44.455 49.537 0.000 49.537 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.749 0.762 0.738 - 0.738 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - CG002 MK 110 GUN Cost Recurring Cost 1.1.1) 57MM GUN (†) 8,913K 19 169.345 - - - 1.1.2) INTEGRATED LOGISTICS SUPPORT - - 37.577 - - 11.727 - - 1.1.3) WMSL MK110 BACKFIT - - 1.646 - - - - Subtotal: Recurring Cost - - 208.568 - - 11.727 - Subtotal: Hardware - CG002 MK 110 GUN Cost - - 208.568 - - 11.727 - 1,529K 18 27.514 - - - 1,345K 2.1.2) INTEGRATED LOGISTICS SUPPORT - - 10.954 - - 5.632 - 2.1.3) WMSL MK160 57MM GUN AMMO UPDATES - - 1.420 - - 1.750 Subtotal: Recurring Cost - - 39.888 - - 7.382 (1) 10,678K 1 10.678 11,105K 1 11.105 - - - 11,105K 1 11.761 - - - - - 11.105 11.309 - - 11.761 - - - - - - - - - - - - 21.987 - - 22.866 - - - - - 22.866 - 21.987 - - 22.866 - - - - - 22.866 1.345 1,399K 1.399 - - - 1,399K - 5.498 - - 5.718 - - - - - 5.718 - - - - - - - - - - - - - - 6.843 - - 7.117 - - - - - 7.117 Hardware - CG003 MK 160 GCS Cost Recurring Cost 2.1.1) GUN COMPUTER (†) SYSTEM LI 4206 - Coast Guard Weapons Navy 1 UNCLASSIFIED Page 4 of 24 1 P-1 Line #41 1 1.399 Volume 1 - 522 === page 563 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Coast Guard Weapons MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware - CG003 MK 160 GCS Cost Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) - ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) 39.888 - - 7.382 - - 6.843 - - - - - - 3,412K - - - 3.312 3,445K FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) 7.117 - - - - 3.412 - - - 3,412K - - - - - 3.445 - - - 3,445K Total Cost Qty (Each) ($ M) - 7.117 Hardware - CG004 MK 38 MACHINE GUN SYSTEMS Cost Recurring Cost 3.1.1) MACHINE GUN SYSTEM EQUIPMENT ASC (†) - - - - 1 1 3.412 1,095K 73 79.970 1,088K 6 6.528 - 1,244K 9 11.193 1,122K 3 3.365 3,312K 1,243K 6 7.456 1,122K 2 2.243 - - - - - - - - - - - - 3,282K 4 13.127 - - - - - - - - - - - - - - - (2) 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC (†) 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC (†) 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 1 - 1 - - 1 3.445 (†) 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC (†) 3.1.6) MK38 COAXIAL GUN & CUAS UPGRADE - - 4.288 - - 1.741 - - 0.522 - - 0.543 - - - - - 0.543 3.1.7) INTEGRATED LOGISTICS SUPPORT FRC - - 24.611 - - 2.299 - - 2.310 - - 2.402 - - - - - 2.402 3.1.8) INTEGRATED LOGISTICS SUPPORT OPC - - 4.952 - - 0.758 - - 0.761 - - 0.791 - - - - - 0.791 3.1.9) INTEGRATED LOGISTICS SUPPORT WMEC - - 2.962 - - 0.713 - - 0.717 - - 0.746 - - - - - 0.746 3.1.10) INTEGRATED LOGISTICS SUPPORT PSC - - 0.801 - - 0.557 - - 0.559 - - 0.581 - - - - - 0.581 Subtotal: Recurring Cost - - 149.360 - - 18.204 - - 8.181 - - 11.920 - - - - - 11.920 Subtotal: Hardware - CG004 MK 38 MACHINE GUN SYSTEMS Cost - - 149.360 - - 18.204 - - 8.181 - - 11.920 - - - - - 11.920 Support - CG005 GUN WEAPON SYSTEM INTEGRATION Cost LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 5 of 24 P-1 Line #41 Volume 1 - 523 === page 564 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Coast Guard Weapons MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 4.1) Gun Weapon System Integration Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 28.601 - - 7.406 - - 7.443 - - 7.634 - - - - - 7.634 Subtotal: Support - CG005 GUN WEAPON SYSTEM INTEGRATION Cost - - 28.601 - - 7.406 - - 7.443 - - 7.634 - - - - - 7.634 Gross/Weapon System Cost - - 426.417 - - 44.718 - - 44.455 - - 49.537 - - 0.000 - - 49.537 Remarks: [Hardware] Removed System Engineering Support, Production Support, Data, Software & Test Support, Ancillary Equipment and MK160 GCS Software Update OPC Cost Elements from FY26. (†) indicates the presence of a P-5a Footnotes: (1) With the cancellation of FFG, the United States Coast Guard Navy Type/ Navy Owned Program cannot leverage a quantity buy of the MK 110 57mm gun with other programs leading to an FY 2027 cost increase. (2) New USCG Arctic Security Cutter class surface acquisition program requirement to procure MK 38 Machine Gun Weapon System. MK 38 MOD 4 will fulfill the capability requirements of Anti-Terrorism/Force Protection and Surface Warfare by providing the ability to fire warning and disabling shots against surface targets and engage low-slow flying aircraft and UAVs achieving mission kills out to effective gunfire range. LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 6 of 24 P-1 Line #41 Volume 1 - 524 === page 565 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Item Number / Title [DODIC]: 1 / Coast Guard Weapons FY Contractor and Location Method/Type or Funding Vehicle (†) 2016 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NAVSEA Dec 2015 Jan 2018 1 8,528K Y Oct 2013 (†) 2017 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NAVSEA Aug 2017 Sep 2019 2 8,490K Y Aug 2016 (†) 2018 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NAVSEA Jun 2018 Jul 2020 2 8,855K Y Aug 2016 2019 (3) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA Jun 2019 Oct 2021 2 9,023K Y Aug 2016 2020 (4) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA Sep 2020 Jan 2023 2 9,195K Y Aug 2016 2021 (5) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA Sep 2021 Jan 2024 2 9,370K Y Nov 2020 Cost Elements O O C P-1 Line Item Number / Title: 4206 / Coast Guard Weapons 1.1.1) 57MM GUN 1.1.1) 57MM GUN 1.1.1) 57MM GUN (†) 1.1.1) 57MM GUN (†) 1.1.1) 57MM GUN (†) 1.1.1) 57MM GUN (†) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2022 (6) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA May 2022 Sep 2024 2 9,427K Y Nov 2020 (†) 2023 (7) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA Jun 2023 Oct 2025 1 9,946K Y Nov 2020 (†) 2024 (8) BAE SYSTEMS / MINNEAPOLIS, MN C / FFP NAVSEA May 2024 Sep 2026 1 10,023K Y Nov 2020 2026 (9) BAE SYSTEMS / MINNEAPOLIS, MN C / FP NAVSEA May 2026 Sep 2028 1 10,678K Y Nov 2020 (10) BAE SYSTEMS / MINNEAPOLIS, MN C / FP NAVSEA May 2027 Jun 2029 1 11,105K N Nov 2020 2017 LOCKHEED MARTIN / MANASSAS, VA C / FFP NAVSEA Mar 2017 Dec 2017 1 1,506K Y Jan 2016 2018 LOCKHEED MARTIN / MANASSAS, VA C / FFP NAVSEA Mar 2018 Dec 2018 3 1,535K Y Jan 2016 1.1.1) 57MM GUN 1.1.1) 57MM GUN 1.1.1) 57MM GUN (†) 1.1.1) 57MM GUN (†) 1.1.1) 57MM GUN 2027 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2019 (11) LOCKHEED MARTIN / MANASSAS, VA C / FFP NAVSEA Jun 2019 Dec 2020 3 1,564K Y Jan 2016 2020 (12) LOCKHEED MARTIN / MANASSAS, VA C / FFP NAVSEA Jul 2020 Jan 2022 2 1,594K Y Jan 2016 2021 (13) LOCKHEED MARTIN / MANASSAS, VA C / FFP NAVSEA May 2021 Nov 2022 2 1,624K Y Jan 2016 2022 (14) DRS LAUREL TECHNOLOGIES / JOHNSONTOWN, PA C / FFP NAVSEA Jun 2022 Sep 2024 2 1,634K Y May 2019 2023 (15) DRS LAUREL TECHNOLOGIES / JOHNSONTOWN, PA C / FP NAVSEA Jun 2023 Sep 2025 2 1,250K Y May 2019 2024 DRS LAUREL TECHNOLOGIES / JOHNSONTOWN, PA C / FP NAVSEA Jun 2024 Sep 2026 2 1,312K Y May 2019 2026 DRS LAUREL TECHNOLOGIES / JOHNSONTOWN, PA C / FFP NAVSEA Jun 2026 Dec 2027 1 1,345K Y May 2019 2027 DRS LAUREL TECHNOLOGIES / JOHNSONTOWN, PA C / FFP NAVSEA Jun 2027 Dec 2028 1 1,399K N May 2019 2027 MSI Defense Systems / ROCK HILL, SC SS / FP NSWC IHD Jun 2027 Jun 2029 1 3,412K Y Dec 2021 2017 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Sep 2017 Sep 2018 1 1,230K Y Aug 2016 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 2.1.1) GUN COMPUTER SYSTEM 3.1.1) MACHINE GUN SYSTEM EQUIPMENT ASC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 7 of 24 P-1 Line #41 Volume 1 - 525 === page 566 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Item Number / Title [DODIC]: 1 / Coast Guard Weapons FY Contractor and Location Method/Type or Funding Vehicle 2018 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2018 Jun 2019 11 1,254K Y Aug 2016 2019 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2019 Jun 2020 6 1,278K Y Aug 2016 2020 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2020 Jun 2021 6 1,302K Y Aug 2016 2021 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Sep 2021 Sep 2022 6 1,327K Y Aug 2016 2022 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2022 Jun 2023 6 1,335K Y Dec 2021 2024 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IH Jun 2024 Jun 2025 6 1,077K Y Dec 2021 2025 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IH Jun 2025 Jun 2026 6 1,088K Y Dec 2021 2017 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Mar 2017 Mar 2018 1 1,230K Y Aug 2015 2018 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2018 Jun 2019 1 1,254K Y Aug 2015 2019 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2019 Jun 2020 1 1,278K Y Aug 2015 2020 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2020 Jun 2021 2 1,302K Y Aug 2015 2022 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2022 Jun 2023 2 1,335K Y Dec 2021 2024 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2024 Jun 2025 2 1,078K Y Dec 2021 2025 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2025 Jun 2026 3 1,122K Y Dec 2021 2026 MSI Defense Systems / ROCK HILL, SC SS / FP NSWC IHD Jun 2026 Jun 2028 1 3,312K Y Dec 2021 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 2020 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2020 Jun 2021 1 1,302K Y Aug 2016 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 2021 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Sep 2021 Sep 2022 1 1,327K Y Aug 2016 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 2022 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2022 Jun 2023 2 1,335K Y Dec 2021 Cost Elements O O C P-1 Line Item Number / Title: 4206 / Coast Guard Weapons 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.2) MACHINE GUN SYSTEM (†) EQUIPMENT FRC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC 3.1.3) MACHINE GUN SYSTEM (†) EQUIPMENT OPC LI 4206 - Coast Guard Weapons Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 24 P-1 Line #41 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 526 === page 567 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 FY Contractor and Location 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 2024 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2024 Jun 2025 2 1,078K Y Dec 2021 3.1.4) MACHINE GUN SYSTEM EQUIPMENT WMEC 2025 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jun 2025 Jun 2026 2 1,122K Y Dec 2021 2023 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jul 2023 Dec 2024 2 3,250K Y 2024 BAE SYSTEMS / MINNEAPOLIS, MN SS / FP NSWC IHD Jul 2024 Dec 2025 2 3,314K Y 3.1.5) MACHINE GUN SYSTEM (†) EQUIPMENT PSC 3.1.5) MACHINE GUN SYSTEM (†) EQUIPMENT PSC (†) Item Number / Title [DODIC]: 1 / Coast Guard Weapons Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (3) (4) (5) (6) (7) (8) (9) 27 month manufacturing lead time. 27 month manufacturing lead time. 27 month manufacturing lead time. 27 month manufacturing lead time. 27 month manufacturing lead time. 27 month manufacturing lead time. 28 month manufacturing lead time. (10) (11) (12) (13) (14) (15) 28 month manufacturing lead time. Manufacturing lead time will be 18 months. Manufacturing lead time will be 18 months. Manufacturing lead time will be 18 months. Manufacturing lead time will be 18 months. Manufacturing lead time will be 18 months. LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 9 of 24 P-1 Line #41 Volume 1 - 527 === page 568 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 0 1 1 2017 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - - - - - - 1 A - - 1 2018 NAVY 2 0 2 2 2 1 2019 NAVY 2 0 2 2 1 2020 NAVY 2 0 2 2 1 2021 NAVY 2 0 2 2 1 2022 NAVY 2 0 2 2 1 2023 NAVY 1 0 1 1 1 2024 NAVY 1 0 1 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 0 1 2 2018 NAVY 11 0 11 A - 11 1 2 2019 NAVY 6 0 6 6 2 2020 NAVY 6 0 6 6 2 2021 NAVY 6 0 6 6 2 2022 NAVY 6 0 6 6 2 2024 NAVY 6 0 6 6 2 2025 NAVY 6 0 6 6 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 0 1 3 2018 NAVY 1 0 1 1 3 2019 NAVY (16) 0 1 1 3 2020 NAVY 2 0 2 2 3 2022 NAVY 2 0 2 2 3 2024 NAVY 2 0 2 2 3 2025 NAVY 3 0 3 3 4 2026 NAVY 1 0 1 1 1 A - - - - - - - 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 528 1 === page 569 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 0 2 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 2 2 O C T LI 4206 - Coast Guard Weapons Navy Fiscal Year 2017 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 529 === page 570 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 0 1 - - - 1 2017 NAVY 2 0 2 - - - 1 0 1 2018 NAVY 2 0 2 1 2019 NAVY 2 0 2 1 2020 NAVY 2 0 2 2 1 2021 NAVY 2 0 2 2 1 2022 NAVY 2 0 2 2 1 2023 NAVY 1 0 1 1 1 2024 NAVY 1 0 1 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 - - - - - - - - - - - - - - - - - - - - 1 A - - - - - - - - - - - - - - - - 1 2 A - - - - 2 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 0 1 2 2018 NAVY 11 0 11 - - - - - - - - - - - A - - - 1 0 2 2019 NAVY 6 0 6 2 2020 NAVY 6 0 6 6 2 2021 NAVY 6 0 6 6 2 2022 NAVY 6 0 6 6 2 2024 NAVY 6 0 6 6 2 2025 NAVY 6 0 6 6 - - - - - - - - - 1 - A - 1 - - - 9 - 6 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 0 1 3 2018 NAVY 1 0 1 3 2019 NAVY (16) 0 1 3 2020 NAVY 2 0 2 2 3 2022 NAVY 2 0 2 2 3 2024 NAVY 2 0 2 2 3 2025 NAVY 3 0 3 3 4 2026 NAVY 1 0 1 1 1 - - - - - 1 0 A - - - - - - - - - - - - 1 0 A - - - - 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 530 1 === page 571 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 0 2 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 2 2 O C T LI 4206 - Coast Guard Weapons Navy Fiscal Year 2019 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 531 === page 572 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 1 0 1 2017 NAVY 2 1 1 - - 0 1 2018 NAVY 2 0 2 - - - - - - - - - 1 2019 NAVY 2 0 2 - - - - - - - - - 1 2020 NAVY 2 0 2 1 2021 NAVY 2 0 2 1 2022 NAVY 2 0 2 2 1 2023 NAVY 1 0 1 1 1 2024 NAVY 1 0 1 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 1 0 1 - - - 1 - - - - - - - - - - - - - - 0 2 A - - - - - - - - - - - - - 2 A - 2 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 1 0 2 2018 NAVY 11 2 9 0 2 2019 NAVY 6 0 6 2 2020 NAVY 6 0 6 2 2021 NAVY 6 0 6 2 2022 NAVY 6 0 6 6 2 2024 NAVY 6 0 6 6 2 2025 NAVY 6 0 6 6 0 1 - - 1 - - - 1 - 1 - 1 - - - - - 1 1 - - A - 1 1 - - - - 1 1 - - - - 1 - - - - 1 - - - - 1 0 1 - 0 - - 1 - 1 - 4 A - 6 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 1 0 3 2018 NAVY 1 1 0 3 2019 NAVY (16) 0 1 3 2020 NAVY 2 0 2 3 2022 NAVY 2 0 2 2 3 2024 NAVY 2 0 2 2 3 2025 NAVY 3 0 3 3 4 2026 NAVY 1 0 1 1 1 0 - - - - - - - - 1 0 A - - - - - - - - - - - - 2 0 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 532 === page 573 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 0 2 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 2 2 O C T LI 4206 - Coast Guard Weapons Navy Fiscal Year 2021 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 533 === page 574 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 1 0 0 1 2017 NAVY 2 2 0 0 1 2018 NAVY 2 2 0 1 2019 NAVY 2 0 2 1 2020 NAVY 2 0 2 1 2021 NAVY 2 0 2 1 2022 NAVY 2 0 2 1 2023 NAVY 1 0 1 1 2024 NAVY 1 0 1 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 0 1 - - 1 - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - - A - - - - - - - - 1 - - 1 - - - - - - - - - 0 2 - - - - - - - - - 2 A - - - - 1 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 1 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 6 6 0 2 2020 NAVY 6 2 4 2 2021 NAVY 6 0 6 2 2022 NAVY 6 0 6 2 2024 NAVY 6 0 6 6 2 2025 NAVY 6 0 6 6 0 1 - - 1 - - - 1 - - - 1 - 0 - - - - - A - - - 1 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 1 0 - 1 - 4 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 1 0 0 3 2018 NAVY 1 1 0 0 3 2019 NAVY (16) 1 0 0 3 2020 NAVY 2 2 0 3 2022 NAVY 2 0 2 3 2024 NAVY 2 0 2 2 3 2025 NAVY 3 0 3 3 4 2026 NAVY 1 0 1 1 1 0 A - - - - - - - - - - - - 2 0 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 534 === page 575 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 0 2 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2022 O C T D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G A - S E P - - 2 2 O C T LI 4206 - Coast Guard Weapons Navy N O V B A L A N C E Fiscal Year 2023 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 535 === page 576 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 1 0 0 1 2017 NAVY 2 2 0 0 1 2018 NAVY 2 2 0 0 1 2019 NAVY 2 2 0 0 1 2020 NAVY 2 2 0 1 2021 NAVY 2 0 2 - - - 1 2022 NAVY 2 0 2 - - - 1 2023 NAVY 1 0 1 - - - 1 2024 NAVY 1 0 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 0 1 - - 1 - - - - - - - - 0 - - - - - - - - A - - - - 1 - - 1 - - - - - - - - - - - - - 0 1 - - - - - - - - - - - - - 1 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 1 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 6 6 0 0 2 2020 NAVY 6 6 0 0 2 2021 NAVY 6 6 0 2 2022 NAVY 6 2 4 2 2024 NAVY 6 0 6 2 2025 NAVY 6 0 6 0 1 - 1 - 1 - 1 0 A - - - - - - - - - - - - 1 - A - 1 - - - 4 - 6 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 1 0 0 3 2018 NAVY 1 1 0 0 3 2019 NAVY (16) 1 0 0 3 2020 NAVY 2 2 0 0 3 2022 NAVY 2 2 0 3 2024 NAVY 2 0 2 3 2025 NAVY 3 0 3 4 2026 NAVY 1 0 1 1 0 A - - - - - - - - - - - - 2 0 A - - - - 1 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy 3 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 536 === page 577 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 0 2 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2024 O C T O C T LI 4206 - Coast Guard Weapons Navy N O V D E C - N O V J A N - D E C F E B - J A N M A R - F E B A P R - M A R M A Y - A P R B A L A N C E Fiscal Year 2025 J U N - M A Y J U L - J U N Calendar Year 2025 A U G S E P O C T N O V D E C - - - - - A - - - - - J U L A U G UNCLASSIFIED Page 19 of 24 S E P O C T N O V J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2 0 D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 537 2 === page 578 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 4 1 2016 NAVY 1 1 0 0 1 2017 NAVY 2 2 0 0 1 2018 NAVY 2 2 0 0 1 2019 NAVY 2 2 0 0 1 2020 NAVY 2 2 0 0 1 2021 NAVY 2 2 0 0 1 2022 NAVY 2 2 0 1 2023 NAVY 1 0 1 1 2024 NAVY 1 0 1 1 2026 NAVY 1 0 1 1 2027 NAVY 1 0 1 0 1 0 - - - - - - - - - - - A - - - - 1 0 - - - - - - - - - - - - - 1 A - - - - - 1 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 1 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 6 6 0 0 2 2020 NAVY 6 6 0 0 2 2021 NAVY 6 6 0 0 2 2022 NAVY 6 6 0 2 2024 NAVY 6 2 4 2 2025 NAVY 6 0 6 0 1 - - 1 - - - 1 - - - 1 - 0 - - 1 - 1 - 1 - 1 - 1 - 1 0 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 1 0 0 3 2018 NAVY 1 1 0 0 3 2019 NAVY (16) 1 0 0 3 2020 NAVY 2 2 0 0 3 2022 NAVY 2 2 0 0 3 2024 NAVY 2 2 0 3 2025 NAVY 3 0 3 4 2026 NAVY 1 0 1 1 0 - - - - - - - - 3 0 A - - - - - - - - - - - - - - - - 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 538 1 === page 579 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 2 0 5 2024 NAVY 2 0 2 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 O C T LI 4206 - Coast Guard Weapons Navy Fiscal Year 2027 N O V 2 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 539 === page 580 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) 57MM GUN PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 4 1 2016 NAVY 1 1 0 0 1 2017 NAVY 2 2 0 0 1 2018 NAVY 2 2 0 0 1 2019 NAVY 2 2 0 0 1 2020 NAVY 2 2 0 0 1 2021 NAVY 2 2 0 0 1 2022 NAVY 2 2 0 0 1 2023 NAVY 1 1 0 0 1 2024 NAVY 1 1 0 1 2026 NAVY 1 0 1 - - - - - - - - - - - 1 2027 NAVY 1 0 1 - - - - - - - - - - - 0 1 0 - - - - - - - - - 1 0 3.1.2) MACHINE GUN SYSTEM EQUIPMENT FRC Prior Years Deliveries: 31 2 2017 NAVY 1 1 0 0 2 2018 NAVY 11 11 0 0 2 2019 NAVY 6 6 0 0 2 2020 NAVY 6 6 0 0 2 2021 NAVY 6 6 0 0 2 2022 NAVY 6 6 0 0 2 2024 NAVY 6 6 0 0 2 2025 NAVY 6 6 0 0 3.1.3) MACHINE GUN SYSTEM EQUIPMENT OPC 3 2017 NAVY 1 1 0 0 3 2018 NAVY 1 1 0 0 3 2019 NAVY (16) 1 0 0 3 2020 NAVY 2 2 0 0 3 2022 NAVY 2 2 0 0 3 2024 NAVY 2 2 0 0 3 2025 NAVY 3 3 0 4 2026 NAVY 1 0 1 1 0 - - - - - - - - 1 0 3.1.5) MACHINE GUN SYSTEM EQUIPMENT PSC O C T LI 4206 - Coast Guard Weapons Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 540 === page 581 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT M F R # FY SERVICE 5 2023 NAVY 2 2 0 5 2024 NAVY 2 2 0 PROC QTY Item Number / Title [DODIC]: 1 / Coast Guard Weapons Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 0 0 O C T LI 4206 - Coast Guard Weapons Navy Fiscal Year 2029 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 541 === page 582 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4206 / Coast Guard Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Item Number / Title [DODIC]: 1 / Coast Guard Weapons Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 BAE SYSTEMS MINNEAPOLIS, MN 1 2 4 9 3 30 33 3 3 25 28 2 BAE SYSTEMS MINNEAPOLIS, MN 10 24 60 6 3 18 21 3 3 12 15 3 BAE SYSTEMS MINNEAPOLIS, MN 10 24 60 6 3 18 21 3 3 12 15 4 MSI Defense Systems ROCK HILL, SC 10 24 60 6 3 24 27 3 3 24 27 5 BAE SYSTEMS MINNEAPOLIS, MN 10 24 6 3 17 20 6 3 17 20 TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (16) Dates associated with this purchase in P5-a not yet provided LI 4206 - Coast Guard Weapons Navy UNCLASSIFIED Page 24 of 24 P-1 Line #41 Volume 1 - 542 === page 583 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4217 / Gun Mount Mods of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 566.963 566.963 566.963 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 84.004 0.000 84.004 88.725 90.296 91.901 94.762 - 122.246 122.246 122.246 107.696 107.696 107.696 To FY 2031 Complete - - - - - - - - 84.004 0.000 84.004 88.725 90.296 91.901 94.762 - - - - - - - - - 84.004 0.000 84.004 88.725 90.296 91.901 94.762 - 4.534 Continuing Total 1,246.593 1,246.593 1,246.593 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 4.052 4.126 3.990 - 3.990 4.287 4.365 4.443 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Gun Mount Mods supports various types of Gun Weapon Systems, sub-system modifications, and upgrade requirements. [P5 / E5002 MEDIUM CALIBER GUN MODS]: Medium Caliber Gun Mounts (MK110 57mm) installed on United States Coast Guard (USCG) Maritime Security Cutters, Large (WMSL), and USCG Maritime Security Cutters, Medium (WMSM) as well as land based training/test units. The gun mounts provide an anti-surface warfare and anti-air warfare capability for outfitted ships. Funds procure Ordnance Alterations (ORDALT) kits, provide Integrated Logistics Support (ILS), and provide production engineering for system improvements that affect safety, reliability and maintainability. [P5 / E5006 MINOR CALIBER GUN MODS]: Minor Caliber Gun Mounts (MK38 MOD or MK46 MOD) are installed on Amphibious Assault Ships (AS), Aircraft Carrier (nuclear propulsion) (CVN), Guided Missile Cruisers, (CG), Destroyer Designated Guided ships (DDG), Littoral Combat Ships (LCS), Landing Ship Dock amphibious assault ships (LSD), Landing Helicopter Assault ships (LHA), Landing Helicopter Dock amphibious assault ships (LHD), Landing Platform Dock amphibious transport ship (LPD), Patrol Crafts Coastal (PC), Amphibious Command Ships (LCC), MK VI Patrol Boats and land based training/test units. The gun mounts provide an anti-surface warfare and anti-air warfare capability for outfitted ships. Funds procure gun weapon system, ordnance alteration (ORDALT), and conversion kits. Funds also deliver integrated logistics support (ILS), production engineering, and installations for system improvements that affect safety, cybersecurity, reliability, and maintainability. USN Fleet population of 25mm MK38 Machine Gun System (MGS) consists of MOD 2 and MOD 3 variants. The MOD 2 will be converted to the MOD 3 to receive obsolescence, cybersecurity, and Counter Unmanned Aerial System (C-UAS) capability upgrades. DDG 51 Flight IIA and Flight III Destroyers will receive the new 30mm MK38 MOD 4 Gun Weapon System (GWS), which is integrated with the AEGIS combat system for greater lethality and accuracy in the execution of C-UAS and Counter Unmanned Surface Vehicles (C-USV) operations. [P5 / E5011 MAJOR CALIBER GUN MODS]: The 5-Inch MK45 MOD Gun Mounts are automated, lightweight, single-barrel gun mounts that provide an anti-surface warfare, anti-air warfare, and naval surface fire support capability for outfitted ships. The MK45 is installed on CG47 and DDG51 Class surface ships and land based training/test units. Funds procure ORDALTs kits and provide ILS and production engineering for system improvements that affect safety, reliability, maintainability. MK45 MOD 1, 2, & 4 KITS GUN PRODUCTION FY 2026 scope increased to sustain MK45 Gun and Gun Barrel production with industrial base, production capability improvements. Replacing three (3) aging machines in the MK45 gun barrel production line and upgrade controller software. [P5 / E5CON BALLISTIC SHIELDING]: Crew Served Weapon Systems (CSWS) Advanced Ballistic Shielding (ABS) - Advanced Ballistic Shielding will be procured and installed onboard Aircraft Carrier (nuclear propulsion) (CVN), providing ballistic protection for Crew Served Weapon Systems. Funds are used for ship checks, Ship Installation Drawings (SID), procure materials, shipboard M2200 Shielding Kits, and production engineering for system improvements that affect safety, reliability, and maintainability. FY 2026 program increase in support of Ballistic Shields for Crew Served Weapon Systems (CSWS) on DDG. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 1 of 13 P-1 Line #42 Volume 1 - 543 === page 584 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4217 / Gun Mount Mods of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / E5079 CUAS HYPERVELOCITY PROJECTILE]: Counter Unmanned Aircraft System (C-UAS) Hypervelocity Projectile (HVP): funds emergent requirement in support of Counter Unmanned Aircraft System (C-UAS) for the integration and fielding of Hypervelocity Projectile (HVP) capability into MK160/MK34, efforts include MK160/MK20 Integration. FY2025 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). [P5 / SSBN TRANSIT PROTECTION VESSELS GUN MOUNTS]: SSBN TRANSIT PROTECTION VESSELS GUN MOUNTS: Minor Caliber Gun Mounts (MK38 MOD) are installed on SSBN Transit Protection Vehicles which provide force protection for SSBNs transiting to and from homeport. The gun mounts provide an anti-surface warfare and anti-air warfare capability for outfitted ships. Funds procure gun weapon system conversion kits and installations for system improvements that affect safety, cybersecurity, reliability, and maintainability. The MK38 MOD 2 systems will be converted to the MOD 3 to receive obsolescence, cybersecurity, and Counter Unmanned Aerial System (C-UAS) capability upgrades. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 2 of 13 P-1 Line #42 Volume 1 - 544 === page 585 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4217 / Gun Mount Mods of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Gun Mount Mods P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 566.963 - / 122.246 - / 107.696 - / 84.004 - / 0.000 - / 84.004 - / 566.963 - / 122.246 - / 107.696 - / 84.004 - / 0.000 - / 84.004 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: E5002 MEDIUM CALIBER GUN MODS supports requirements for Ordnance Alterations (ORDALT) kits, Integrated Logistics Support (ILS), and production engineering for system improvements that affect safety, reliability, and maintainability of in-service guns. E5006 MINOR CALIBER GUN MODS MK38: The USN stopped procuring new MK38 MOD 3 MGS (MK38 GUN KITS). Future MK38 MOD 3 MGS will be created by refurbishing and upgrading 25mm MK38 MOD 2 MGS. MK38 COAX ORDALT KIT, MK38 COAX ORDALT KIT INSTALL, MK38 MOD 3 CONVERSION KIT, MK38 MOD 3 CONVERSION KIT FWD FIT INSTALL, and MK38 MOD 3 CONVERSION KIT BACKFIT INSTALL reflect this fielding change. MK38 MOD 4 Gun Weapon System (GWS), MK38 MOD 4 GWS Install Planning, MK38 MOD 4 GWS Installation, MK38 MOD 4 GUN MOUNT, MK38 MOD 4 EOSS, MK38 MOD 4 CANNON, and MK38 MOD 4 CONSOLE support procurements of the MK38 MOD 4 GWS and installations on DDG 51 Flight IIA and Flight III Destroyers. This supports fielding of critical C-UAS and C-USV capability. MK38 7.62mm Coaxial Automatic Gun Ordnance Alteration Kit (COAX ORDALT KIT) upgrade is required for full Counter Unmanned Aerial System (C-UAS) capability. The CUAS capability is a critical and urgent ship self-defense capability per Joint Urgent Operational Need Statement CC-0558 (JUONS CC-0558). MK38 MOD 3 CONVERSION KITs convert fielded MK38 MOD 2 MGS units to MK38 MOD 3 with C-UAS and cybersecurity upgrades. The procurement and installation quantities are based on a 28-month production lead time and ship availability schedules. MK38 MOD 3 CONVERSION KIT INSTALLs refurbishes and upgrades a 25mm MK38 MOD 2 MGS by installing a MK38 MOD 3 CONVERSION KIT. The installs are forward fit or backfit if they previously had a MK38 MOD 2 MGS. MK38 GUN KITS ILS/TEST/PRODUCTION supports MK38 MOD2 through MOD4 MGS during production and testing prior to installation onboard a ship. MK38 UPGRADE LOGISTICS support funds development of integrated logistics support certification, ship change directive development, technical manual updates, provisioning support, and other logistics efforts required to support the system while installed onboard a ship. E5006 MINOR CALIBER GUN MODS MK46 GWS supports requirements for Ordnance Alterations (ORDALT) kits, Integrated Logistics Support (ILS), fleet obsolescence support, software support, and production engineering for system improvements that affect safety, reliability, and maintainability of in-service guns. E5011 MAJOR CALIBER GUN MODS supports requirements for Ordnance Alterations (ORDALT) kits, Integrated Logistics Support (ILS), fleet obsolescence support, production support, and production engineering for system improvements that affect safety, reliability, and maintainability of in-service guns. E5079 COUNTER-UNMANNED AIRCRAFT SYSTEM HYPERVELOCITY PROJECTILE supports Counter Unmanned Aircraft System (C-UAS) MK160/MK20 Integration. This funds an emergent requirement in support of Counter Unmanned Aircraft System (C-UAS) for the integration and fielding of Hypervelocity Projectile (HVP) capability into MK160/MK34. FY2025 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). SSP TPP MK38 MOD 2 TO MOD 3 CONVERSION KITS FY 2027 scope increases to begin conversion of SSBN Transit Protection Program (TPP) MK38 MOD 2 to MK38 MOD 3 kits. Each escort vessel has a forward and aft gun system - FY 2027 scope provides for procurement of qty of 2 each MK38 MOD 3 conversion kits, C-UAS kits, Toplight Electro-Optical Information Surveillance and Reconnaissance & Targeting System (EOSS) conversion kit, and associated cabling. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 3 of 13 P-1 Line #42 Volume 1 - 545 === page 586 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Gun Mount Mods MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 566.963 Less PY Advance Procurement ($ in Millions) 122.246 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) - 84.004 0.000 84.004 107.696 - 566.963 - - 122.246 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 107.696 - 566.963 FY 2027 Base - - - - 84.004 0.000 84.004 - 122.246 107.696 FY 2027 Total - - - 84.004 0.000 84.004 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 4.052 4.126 3.990 - 3.990 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - E5002 MEDIUM CALIBER GUN MODS Cost Recurring Cost 1.1.1) MEDIUM - - 33.912 - - 1.1.2) MEDIUM CALIBER GUN - - 22.021 - Subtotal: Recurring Cost - - 55.933 - Subtotal: Hardware - E5002 MEDIUM CALIBER GUN MODS Cost - - 55.933 CALIBER KITS (1) 4.114 - - 4.197 - - - - - - 4.114 - - - 4.114 4.090 - - - - - - - - - 4.197 - - - 4.197 4.090 - - - - - - - - - 4.090 - - - - - 4.090 - - 4.090 - - - - - 4.090 Hardware - E5006 MINOR CALIBER GUN MODS Cost Recurring Cost 2.1.1) MK38 COAX ORDALT KIT 2.1.2) MK38 COAX ORDALT KIT INSTALL (2) 2.1.3) MK38 MOD 3 CONVERSION KIT 2.1.4) MK38 MOD 3 CONVERSION KIT FWD FIT INSTALL (3) 2.1.5) MK38 MOD 3 CONVERSION KIT BACKFIT INSTALL - - 8.223 - - 6.498 - - 2.097 - - - - - - - - - - - 0.060 - - 0.090 - - 0.060 - - 0.105 - - - - - 0.105 - - 39.253 - - 24.273 - - 9.698 - - - - - - - - - - - 1.128 - - 0.624 - - 1.248 - - 2.122 - - - - - 2.122 - - 3.888 - - 2.797 - - 2.078 - - 2.119 - - - - - 2.119 LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 4 of 13 P-1 Line #42 Volume 1 - 546 === page 587 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Gun Mount Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 2.1.6) MK38 GUN KITS ILS / TEST / PRODUCTION SUPT FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 70.870 - - 3.183 - - 2.435 - - 3.943 - - - - - 3.943 - - 22.130 - - 1.268 - - 4.361 - - 2.095 - - - - - 2.095 - - 29.127 - - 3.250 - - 5.064 - - 6.609 - - - - - 6.609 - - - - - 13.920 - - - - - - - - - - - - 1,492K 10 14.921 - - - 1,553K 8 12.424 1,584K 8 12.672 - - - 1,584K 8 12.672 782,846.15 13 10.177 - - - 1,142K 9 10.278 1,165K 10 11.650 - - - 1,165K 10 11.650 997,625.00 8 7.981 - - - 302,000.00 8 2.416 308,000.00 11 3.388 - - - 308,000.00 11 3.388 675,923.08 26 17.574 - - - 332,000.00 9 2.988 339,000.00 18 6.102 - - - 339,000.00 18 6.102 - - 4.446 - - 1.457 - - 1.485 - - 1.515 - - - - - 1.515 - - 14.708 - - 6.600 - - 7.344 - - 11.236 - - - - - 11.236 2.1.16) MK46 GWS KITS - - 33.752 - - 3.680 - - 3.802 - - 3.699 - - - - - 3.699 2.1.17) MK46 GWS KIT INSTALL - - 6.160 - - 0.916 - - 0.950 - - 0.925 - - - - - 0.925 Subtotal: Recurring Cost - - 284.398 - - 68.556 - - 68.728 - - 68.180 - - - - - 68.180 Subtotal: Hardware - E5006 MINOR CALIBER GUN MODS Cost - - 284.398 - - 68.556 - - 68.728 - - 68.180 - - - - - 68.180 (Surface Warfare) (4) 2.1.7) MK38 UPGRADE LOGISTICS SUPT (5) 2.1.8) MK38 TECH (6) REFRESH 2.1.9) MK38 MOD 4 GWS 2.1.10) MK38 MOD 4 GUN MOUNT (†) 2.1.11) MK38 MOD 4 EOSS (†) (7) 2.1.12) MK38 MOD 4 CANNON (†) (8) 2.1.13) MK38 MOD4 CONSOLE (†) (9) 2.1.14) MK38 MOD 4 GWS INSTALL PLANNING 2.1.15) MK38 MOD 4 GWS INSTALLATION (10) Hardware - E5011 MAJOR CALIBER GUN MODS Cost Recurring Cost 3.1.1) MK45 MOD 1, 2 & 4 KITS - - 73.261 - - 6.309 - - 6.425 - - 6.270 - - - - - 6.270 3.1.2) MK45 MOD 1 , 2 & 4 INSTALL / ILS / PROD SUPT - - 39.349 - - 3.267 - - 3.346 - - 3.263 - - - - - 3.263 LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 5 of 13 P-1 Line #42 Volume 1 - 547 === page 588 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Gun Mount Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 3.1.3) MK45 GM CG MOD - - 16.322 - - - - - - - - - - - - - - - 3.1.4) M45 CUAS MK160/MK20 INTEGRATION - - 14.600 - - - - - - - - - - - - - - - 3.1.5) MK45 Mod 1, 2 & 4 Kits Gun Production Capability - - - - - - - - 15.000 - - - - - - - - - Subtotal: Recurring Cost - - 143.532 - - 9.576 - - 24.771 - - 9.533 - - - - - 9.533 Subtotal: Hardware - E5011 MAJOR CALIBER GUN MODS Cost - - 143.532 - - 9.576 - - 24.771 - - 9.533 - - - - - 9.533 - - 83.100 - - - - - 10.000 - - - - - - - - - - - 83.100 - - - - - 10.000 - - - - - - - - - - - 83.100 - - - - - 10.000 - - - - - - - - - (11) Hardware - E5CON BALLISTIC SHIELDING Cost Non Recurring Cost 4.1.1) BALLISTIC SHIELDING HARDWARE/ INSTALLATION (12) Subtotal: Non Recurring Cost Subtotal: Hardware E5CON BALLISTIC SHIELDING Cost Hardware - E5079 CUAS HYPERVELOCITY PROJECTILE Cost Recurring Cost 5.1.1) C-UAS HVP INTEGRATION - - - - - 40.000 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 40.000 - - - - - - - - - - - - Subtotal: Hardware - E5079 CUAS HYPERVELOCITY PROJECTILE Cost - - - - - 40.000 - - - - - - - - - - - - 2.201 - - - 1,100K 2.201 - - - - Hardware - SSBN TRANSIT PROTECTION VESSELS GUN MOUNTS Cost Non Recurring Cost 6.1.1) SSBN TPP MK38 MOD 2 TO MOD 3 CONVERSION - - - - - - - - - 1,100K - - - - - - - - - - 2 2 2.201 (†) (13) KITS Subtotal: Non Recurring Cost LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 6 of 13 - P-1 Line #42 - 2.201 Volume 1 - 548 === page 589 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Gun Mount Mods MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Qty (Each) Unit Cost ($ M) Subtotal: Hardware - SSBN TRANSIT PROTECTION VESSELS GUN MOUNTS Cost - - Gross/Weapon System Cost - - (†) FY 2025 Total Cost ($) - 566.963 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - - - - ($) - 122.246 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - - - - ($) - 107.696 FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 2.201 - - - - - 2.201 - - 84.004 - - 0.000 - - 84.004 indicates the presence of a P-5a Footnotes: (1) FY 2027 E5002 MEDIUM CALIBER GUN MODS 1.1.1 supports requirements for Ordnance Alterations (ORDALT) kits, Integrated Logistics Support (ILS), and production engineering for system improvements that affect safety, reliability and maintainability of in-service guns. (2) (3) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.2) MK38 COAX ORDALT KIT INSTALL: FY 2026 to FY 2027 increase is due to increased number of MK38 COAX ORDALT Kit installations in FY 2027. FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.4) MK38 MOD 3 CONVERSION KIT FWD FIT INSTALL: FY 2026 to FY 2027 increase attributed to the increase in quantity from 6 to 10 and combined cost to install both the gun mount conversion kit and the EOSS conversion kit to the overall machine gun system. (4) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.6) MK38 GUN KITS ILS/TEST/PRODUCTION SUPT: FY 2026 to FY 2027 increase attributed to necessity for preparation including ship checks and installation drawings of numerous MK 38 MOD 4 installations beginning in early FY 2027 on in-service DDGs and LPDs. (5) (6) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.7) MK38 UPGRADE LOGISTICS SUPT: FY 2026 to FY 2027 decrease attributed to reduced logistic support documents requirements in FY 2027. FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.8) TECH REFRESH: Increase from FY 2026 to FY 2027 due to increased engineering change proposals requirements required to mitigate multiple system configurations and software operating system upgrades. (7) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.11) MK38 MOD 4 EOSS - CONTRACTOR MSI: This cost element funds the procurement of ten (10) MK38 MOD 4 EOSS (unit cost $1.165K) in FY 2027 to meet the fielding requirements. This effort supports fielding of critical C-UAS and C-USV capability to DDG 51 ships. FY 2026 to FY 2027 increase is due to the upsurge in quantity for the required MOD4 EOSS. (8) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.12) MK38 MOD 4 CANNON-CONTRATOR NG. This cost element funds the procurement of eleven (11) MK38 MOD 4 CANNON (unit cost $308K) in FY 2027 to meet the fielding requirements. This effort supports fielding of critical C-UAS and C-USV capability to DDG 51 ships. FY 2026 to FY 2027 increase is due to additional quantities for the required MOD4 CANNON. (9) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.13) MK38 MOD 4 CONSOLE-DALHGREN WFC EFFORTS. This cost element funds the procurement of eighteen (18) MK38 MOD 4 Console (unit cost $339K) in FY 2027 to meet the fielding requirements. This effort supports fielding of critical C-UAS and C-USV capability to DDG 51 ships. FY 2026 to FY 2027 increase due to additional quantities for the required MOD4 consoles. (10) FY 2027 E5006 MINOR CALIBER GUN MODS 2.1.15 MK38 MOD 4 GWS INSTALLATION: FY 2026 to FY 2027 increase attributed to additional installations to be completed in FY 2027 supporting the deployment of initial operating capability (IOC) MK38 MOD4 systems on four (4) DDG-51 ships in FY 2027. (11) FY 2027 E5011 MAJOR CALIBER GUN MODS 3.1.5) MK45 MOD 1, 2, & 4 KITS GUN PRODUCTION: Scope increased to sustain MK45 Gun and Gun Barrel production with industrial base, production capability improvements. Replacing three (3) aging machines in the gun barrel production line and upgrade controller software. (12) FY 2027 E5CON BALLISTIC SHIELDS 4.1.1) FY 2026 program increase for Ballistic Shields for Crew Served Weapon Systems (CSWS) on DDG. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 7 of 13 P-1 Line #42 Volume 1 - 549 === page 590 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 P-1 Line Item Number / Title: 4217 / Gun Mount Mods ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Gun Mount Mods MDAP/MAIS Code: (13) FY 2027 SSP TPP MK38 MOD 2 TO MOD 3 CONVERSION KITS 6.1.1) Scope increases to begin conversion of SSBN Transit Protection Program (TPP) MK38 MOD 2 to MK38 MOD 3 kits. Each escort vessel has a forward and aft gun system - FY27 scope provides for procurement of qty of 2 each MK38 MOD 3 conversion kits, C-UAS kits, Toplight Electro-Optical Information Surveillance and Reconnaissance & Targeting System (EOSS) conversion kit, and associated cabling. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 8 of 13 P-1 Line #42 Volume 1 - 550 === page 591 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 O O C Cost Elements 2.1.10) MK38 MOD 4 GUN (†) MOUNT 2.1.10) MK38 MOD 4 GUN (†) MOUNT (†) 2.1.11) MK38 MOD 4 EOSS (†) 2.1.11) MK38 MOD 4 EOSS 2.1.12) MK38 MOD 4 CANNON 2.1.12) MK38 MOD 4 CANNON 2.1.13) MK38 MOD4 CONSOLE (†) 2.1.13) MK38 MOD4 CONSOLE (†) 2.1.13) MK38 MOD4 CONSOLE (†) 6.1.1) SSBN TPP MK38 MOD 2 TO MOD 3 CONVERSION KITS (†) P-1 Line Item Number / Title: 4217 / Gun Mount Mods Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Gun Mount Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2026 MSI Defense Systems / ROCK HILL, SC C / FFP NSWC IH Aug 2026 Aug 2027 8 1,553K Y Jan 2026 2027 MSI Defense Systems / ROCK HILL, SC C / FFP NSWC IH Mar 2027 Jul 2028 8 1,584K Y Jan 2026 2026 MSI Defense Systems / ROCK HILL, SC C / FFP NSWC IH Aug 2026 Aug 2027 9 1,142K Y Jan 2026 2027 MSI Defense Systems / ROCK HILL, SC C / FFP NSWC IH Mar 2027 Jul 2028 10 1,165K Y Jan 2026 2026 NORTHROP GRUMMAN INNOVATION SYSTEMS / Mesa, AZ C / FFP NSWC CRANE May 2026 Jul 2027 8 302,000.00 Y Jul 2025 2027 NORTHROP GRUMMAN INNOVATION SYSTEMS / Mesa, AZ C / TBD NSWC CRANE Oct 2026 Dec 2027 11 308,000.00 Y Jul 2025 (Each) BAE / California, MD C / CPFF NAWC AD Dec 2024 Sep 2025 9 827,000.00 Y Jan 2024 2026 (14) Various / Dahlgren, VA Various NSWC DD Jan 2026 Oct 2026 9 332,000.00 Y Jan 2024 2027 (15) Various / Dahlgren, VA Various NSWC DD Nov 2026 Jan 2028 18 339,000.00 Y Jan 2024 BAE Systems Land & Armaments / Lousiville, KY C / FFP NSWC IH Dec 2026 Apr 2028 2 1,100K Y 2024 2027 indicates the presence of a P-21 Footnotes: (14) (15) FY2026 MK38 MOD 4 console acquisition change: Naval Surface Warfare Center Dahlgren assembling MK38 MOD 4 consoles with components procured from various vendors. FY2027: Naval Surface Warfare Center Dahlgren assembling MK38 MOD 4 consoles with components procured from various vendors. LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 9 of 13 P-1 Line #42 Volume 1 - 551 === page 592 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Gun Mount Mods Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2.1.10) MK38 MOD 4 GUN MOUNT Prior Years Deliveries: 10 1 2026 NAVY 8 0 8 1 2027 NAVY 8 0 8 2.1.11) MK38 MOD 4 EOSS A - - 8 8 (7) Prior Years Deliveries: 13 2 2026 NAVY 9 0 9 2 2027 NAVY 10 0 10 2.1.13) MK38 MOD4 CONSOLE A - - 9 10 (9) Prior Years Deliveries: 17 3 2024 NAVY 9 0 9 4 2026 NAVY 9 0 9 4 2027 NAVY 18 0 18 A - - - - - - - - 9 0 A - - - - - - - - - 9 18 O C T LI 4217 - Gun Mount Mods Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 552 === page 593 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Gun Mount Mods Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2.1.10) MK38 MOD 4 GUN MOUNT Prior Years Deliveries: 10 1 2026 NAVY 8 0 8 1 2027 NAVY 8 0 8 2.1.11) MK38 MOD 4 EOSS - - - - - - - - - - A - - - - - 3 5 - 0 - - - - - - - - - - 4 2 2 - - - - - - 2 2 2 0 (7) Prior Years Deliveries: 13 2 2026 NAVY 9 0 9 2 2027 NAVY 10 0 10 2.1.13) MK38 MOD4 CONSOLE - - - - - - - - - - A - - - - - - 2 - - - - - - - - - - 2 2 - 2 - 1 - 0 - 4 (9) Prior Years Deliveries: 17 3 2024 NAVY 9 9 0 4 2026 NAVY 9 0 9 4 2027 NAVY 18 0 18 0 2 O C T LI 4217 - Gun Mount Mods Navy - - - A - - - N O V D E C J A N 2 F E B M A R A P R 2 M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 3 0 S E P O C T N O V D E C 4 J A N F E B P-1 Line #42 M A R A P R 4 M A Y J U N 5 J U L A U G 5 S E P Volume 1 - 553 0 === page 594 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Gun Mount Mods Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 2.1.10) MK38 MOD 4 GUN MOUNT Prior Years Deliveries: 10 1 2026 NAVY 8 8 0 0 1 2027 NAVY 8 8 0 0 2.1.11) MK38 MOD 4 EOSS (7) Prior Years Deliveries: 13 2 2026 NAVY 9 9 0 2 2027 NAVY 10 6 4 2.1.13) MK38 MOD4 CONSOLE 0 2 2 0 (9) Prior Years Deliveries: 17 3 2024 NAVY 9 9 0 0 4 2026 NAVY 9 9 0 0 4 2027 NAVY 18 18 0 0 O C T LI 4217 - Gun Mount Mods Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 554 === page 595 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Gun Mount Mods Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Item Number / Title [DODIC]: 1 / Gun Mount Mods Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 MSI Defense Systems ROCK HILL, SC 5 10 24 6 6 12 18 8 8 16 24 2 MSI Defense Systems ROCK HILL, SC 5 10 36 6 6 12 18 8 8 16 24 3 BAE - California, MD 6 10 20 1 1 3 4 1 1 2 3 4 Various - Dahlgren, VA 6 10 20 6 6 12 18 8 8 9 17 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4217 - Gun Mount Mods Navy UNCLASSIFIED Page 13 of 13 P-1 Line #42 Volume 1 - 555 === page 596 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 556 === page 597 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4221 / LCS Module Weapons of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete 386 42 10 10 - 10 10 12 12 12 - 49.952 6.438 2.200 2.190 0.000 2.190 2.255 2.295 2.336 2.384 53.237 - - - - - - - - - - - 49.952 6.438 2.200 2.190 0.000 2.190 2.255 2.295 2.336 2.384 53.237 - - - - - - - - - - - 49.952 6.438 2.200 2.190 0.000 2.190 2.255 2.295 2.336 2.384 53.237 Total 494 123.287 123.287 123.287 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - 0.00 129,409.33 153,285.71 220,000.00 219,000.00 - 219,000.00 225,500.00 191,250.00 194,666.67 198,666.67 - 249,568.83 Description: Longbow Hellfire (LBHF) missiles provide Littoral Combat Ship (LCS) firepower and offensive/defensive capabilities against large numbers of small manned and unmanned threats including fast attack craft, fast inshore attack craft, and aircraft, giving LCS the ability to protect the sea lanes and move a force quickly through a choke point or other strategic waterway. LCS equipped with the Surface Warfare Mission Package (SUW MP) will employ these missiles while escorting High Value Units (HVUs) or while conducting littoral operations. Navy procures and modifies LBHF from excess Army inventory for use on LCS. Army has notified Navy that additional LBHF transfers cannot be supported past FY26. Additionally, new production LBHF was last procured in 2005 and is being extended past its service with an uncertain end date These factors necessitate planning for transition to a replacement missile in FY27. Other Related Budgets: BLIs: OPN 1603 LCS SUW Mission Modules, RDT&E 0603596N LCS Mission Modules [P5 / Longbow Hellfire Missile]: The Longbow Hellfire missile is a fire and forget, millimeter-wave seeker missile for autonomous engagement. The Navy procures replacement in kind missiles from the Army inventory, completes shipboard modifications and certifications to deliver to the Fleet. [P5 / Ordnance Handling Equipment]: Ordnance Handling equipment procurements reflect a variety of tools, machinery, and devices used for handling, transportation, storage, and loading/unloading the missiles. Year-to-year, the specific equipment requirements change based on fleet needs and equipment deterioration/attrition. This equipment includes Lifting Caps, Lifting Straps, Missile Exhaust Containment Structure (MECS), MECS shipping brackets, MECS shipping frames, MEP test suite, MK210 stray voltage test sets, maintenance stands, tilt Fixtures, and MASS simulators. The increase in FY26 supports the additional handling equipment requirements. Evaluating ordnance equipment requirements across the FYDP. [P5 / Consulting Services]: Provides program management support, engineering and technical support, studies, analysis and evaluation on mission module systems. LI 4221 - LCS Module Weapons Navy UNCLASSIFIED Page 1 of 8 P-1 Line #43 Volume 1 - 557 === page 598 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4221 / LCS Module Weapons of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / LCS Module Weapons P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 386 / 49.952 42 / 6.438 10 / 2.200 10 / 2.190 - / 0.000 10 / 2.190 386 / 49.952 42 / 6.438 10 / 2.200 10 / 2.190 - / 0.000 10 / 2.190 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Continues the procurement of Longbow Hell Fire missiles in support of the Surface Warfare Mission Package (SUW MP) to meet the Navy's inventory objective. LI 4221 - LCS Module Weapons Navy UNCLASSIFIED Page 2 of 8 P-1 Line #43 Volume 1 - 558 === page 599 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4221 / LCS Module Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS Module Weapons MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 386 42 10 10 - 10 49.952 6.438 2.200 2.190 0.000 2.190 - - - - - - 49.952 6.438 2.200 2.190 0.000 2.190 - - - - - - 49.952 6.438 2.200 2.190 0.000 2.190 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) - 129,409.33 - 153,285.71 220,000.00 219,000.00 - - 219,000.00 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Longbow Hellfire Missile (†) 119,222.80 386 46.020 185,500.00 30 5.565 270,200.00 5 1.351 139,400.00 10 1.394 - - - 139,400.00 10 1.394 1.1.2) Ordnance Handling Equipment - - 0.965 - - 0.461 - - 0.369 - - 0.346 - - - - - 0.346 Subtotal: Recurring Cost - - 46.985 - - 6.026 - - 1.720 - - 1.740 - - - - - 1.740 - - 46.985 - - 6.026 - - 1.720 - - 1.740 - - - - - 1.740 - - 2.967 - - 0.412 - - 0.480 - - 0.450 - - - - - 0.450 - - 2.967 - - 0.412 - - 0.480 - - 0.450 - - - - - 0.450 386 49.952 42 6.438 10 2.200 10 2.190 - - 0.000 10 2.190 Subtotal: Hardware Cost Support Cost 2.1) Consulting Services Subtotal: Support Cost Gross/Weapon System Cost (†) 129,409.33 153,285.71 220,000.00 219,000.00 219,000.00 indicates the presence of a P-5a LI 4221 - LCS Module Weapons Navy UNCLASSIFIED Page 3 of 8 P-1 Line #43 Volume 1 - 559 === page 600 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 O O C Cost Elements (†) P-1 Line Item Number / Title: 4221 / LCS Module Weapons FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / LCS Module Weapons Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Feb 2025 18 129,891.00 Y Qty (Each) 1.1.1) Longbow Hellfire Missile (†) 2024 US Army / Huntsville, AL MIPR JAMS PO Huntsville Mar 2024 1.1.1) Longbow Hellfire Missile (†) 2025 US Army / Huntsville, AL MIPR JAMS PO Huntsville Mar 2025 Feb 2026 30 185,500.00 Y 1.1.1) Longbow Hellfire Missile (†) 2026 US Army / Huntsville, AL MIPR TAGM Huntsville Jan 2026 Dec 2026 5 270,200.00 Y 1.1.1) Longbow Hellfire Missile (†) 2027 US Army / Huntsville, AL MIPR TAGM Huntsville Jan 2027 Dec 2027 10 139,400.00 Y RFP Issue Date indicates the presence of a P-21 LI 4221 - LCS Module Weapons Navy UNCLASSIFIED Page 4 of 8 P-1 Line #43 Volume 1 - 560 === page 601 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4221 / LCS Module Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS Module Weapons Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Longbow Hellfire Missile Prior Years Deliveries: 368 1 2024 NAVY 18 0 18 1 2025 NAVY 30 0 30 A - 1 2026 NAVY 5 0 5 5 1 2027 NAVY 10 0 10 10 - - - - - - - - - 12 6 0 A - O C T LI 4221 - LCS Module Weapons Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #43 M A R - A P R - M A Y - J U N - J U L - A U G - 30 S E P Volume 1 - 561 === page 602 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4221 / LCS Module Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS Module Weapons Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Longbow Hellfire Missile Prior Years Deliveries: 368 1 2024 NAVY 18 18 0 1 2025 NAVY 30 0 30 1 2026 NAVY 5 0 5 1 2027 NAVY 10 0 10 0 - - - 30 A - - 0 - - - - - - - - - 5 0 A - O C T LI 4221 - LCS Module Weapons Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #43 M A R A P R M A Y J U N J U L A U G - 10 S E P Volume 1 - 562 === page 603 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4221 / LCS Module Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS Module Weapons Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Longbow Hellfire Missile Prior Years Deliveries: 368 1 2024 NAVY 18 18 0 0 1 2025 NAVY 30 30 0 0 1 2026 NAVY 5 5 0 1 2027 NAVY 10 0 10 0 O C T LI 4221 - LCS Module Weapons Navy N O V 10 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #43 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 563 === page 604 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4221 / LCS Module Weapons Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Item Number / Title [DODIC]: 1 / LCS Module Weapons Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 US Army - Huntsville, AL 10 110 168 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 11 Total After Oct 1 ALT Prior to Oct 1 11 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 11 11 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4221 - LCS Module Weapons Navy UNCLASSIFIED Page 8 of 8 P-1 Line #43 Volume 1 - 564 === page 605 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4225 / Airborne Mine Neutralization Systems of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 11.635 14.413 14.265 0.000 14.265 15.737 15.921 16.188 160.597 160.597 160.597 - - - - - - - - 11.635 14.413 14.265 0.000 14.265 15.737 15.921 16.188 - - - - - - - - 11.635 14.413 14.265 0.000 14.265 15.737 15.921 16.188 To FY 2031 Complete 16.502 Continuing - Continuing - 16.502 Continuing - Total - Continuing - - 16.502 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Airborne Mine Countermeasures (AMCM) Equipment is currently deployed on MH-53E helicopters (through FY 2027) and MH-60S helicopters to counter the threat of sea mines. The equipment is divided into three categories -- minesweeping, mine hunting, and mine neutralization. (1) Minesweeping is performed by mechanical or influence sweeps. In mechanical sweeping, the mine mooring is severed by the sweep gear allowing the mine to float to the surface where it is destroyed. In influence sweeping, a magnetic or acoustic field, which simulates the magnetic/acoustic signature of a ship, is introduced into the water. This field causes the mine mechanism to actuate. (2) In mine hunting, the objective is to locate, identify, and classify mine-like objects (usually by means of high-resolution sonar). (3) Finally, in mine neutralization, previously identified/classified mine-like objects are re-acquired and neutralized using explosive devices. [P5 / ARCHERFISH Destructor]: AN/ASQ-235 - Airborne Mine Neutralization System (AMNS) provides the MH-60S helicopter with the capability to neutralize proud and moored mines using an expendable mine neutralization device. The system is deployed from the MH-60S helicopter as part of the Littoral Combat Ship (LCS) Mine Countermeasure (MCM) Mission Package or Vessels of Opportunity (VOO). This capability is of critical importance in littoral zones, confined straits, choke points, and the Amphibious Objective Area (AOA). AMNS procurements are funded with OPN for the AMNS Launch and Handling System (LHS) and WPN for the AMNS Archerfish Destructor. LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 1 of 10 P-1 Line #44 Volume 1 - 565 === page 606 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 04: Other Weapons / BSA 2: Modification 4225 / Airborne Mine Neutralization Systems of Guns And Gun Mounts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / ARCHERFISH Mine Neutralization Combat Rounds P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 160.597 - / 11.635 - / 14.413 - / 14.265 - / 0.000 - / 14.265 - / 160.597 - / 11.635 - / 14.413 - / 14.265 - / 0.000 - / 14.265 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports the procurement of 60 Archerfish Destructors, associated engineering, integrated logistics support, and support equipment to support deployment inventory objective requirements. Slight decrease from FY 2026 to FY 2027 is associated with increased demand from the Fleet for Archerfish Destructors and working an accelerated deployment schedule. Archerfish is the only mine neutralizer in the Mine Countermeasure (MCM) Mission Package (MP). Archerfish procurements to date continue the trend toward the Total Munitions Requirement (TMR) for warfighting ordnance capacity. LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 2 of 10 P-1 Line #44 Volume 1 - 566 === page 607 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 11.635 14.413 14.265 0.000 14.265 - Gross/Weapon System Cost ($ in Millions) 160.597 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 160.597 Plus CY Advance Procurement ($ in Millions) - - - - - 11.635 14.413 14.265 0.000 14.265 - Total Obligation Authority ($ in Millions) 160.597 FY 2027 Total - - - - - 11.635 14.413 14.265 0.000 14.265 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 Total Cost Unit Cost 775 130.750 307,617.65 - - 130.750 - - 2.1) Production Engineering - 2.2) ILS/PUBS/Tech Data 2.3) Support Equipment Cost Elements Unit Cost ($) Qty (Each) ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - ARCHERFISH Destructor Cost Recurring Cost 1.1.1) AN/ASQ-235 - AMNS - MH-60S 34 10.459 - - 10.459 130.750 - - - 14.144 - - - 10.022 - - 5.681 Subtotal: Support Cost - - Gross/Weapon System Cost - - (†) (1) Destructor Subtotal: Recurring Cost Subtotal: Hardware ARCHERFISH Destructor Cost 168,709.68 213,758.06 62 13.253 - - 13.253 10.459 - - - 0.528 - - - 0.236 - - 0.412 29.847 - - 160.597 - - 217,366.67 60 13.042 - - - - - 13.042 - - - 13.253 - - 13.042 - - - 0.525 - - 0.549 - - - 0.228 - - 0.246 - - 0.407 - - 0.428 1.176 - - 1.160 - - 11.635 - - 14.413 - - 217,366.67 60 13.042 - - 13.042 - - - 13.042 - - - - 0.549 - - - - - 0.246 - - - - - 0.428 1.223 - - - - - 1.223 14.265 - - 0.000 - - 14.265 Support Cost Remarks: [Hardware] FY 2027 funding supports the procurement of 60 Archerfish destructors and associated engineering, integrated logistics support, and support equipment to support the deployment inventory objective requirements. (†) indicates the presence of a P-5a LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 3 of 10 P-1 Line #44 Volume 1 - 567 === page 608 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds MDAP/MAIS Code: Footnotes: (1) The AMNS WPN unit costs through FY 2025 reflect prices as negotiated in BAE Contract awarded in August 2020. The AMNS WPN unit costs beginning in FY 2026 reflect estimated prices expected in BAE Contract to be awarded in June 2026. Destructor price fluctuates due to material costs and future economic uncertainty. Unit costs in FY 2027 are based on stepladder pricing for destructor procurement. Stepladder pricing penalizes small quantity (21-50) buys with high unit costs and rewards large quantity (101-150) buys with low unit costs. Destructor was previously referred to as neutralizer. LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 4 of 10 P-1 Line #44 Volume 1 - 568 === page 609 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements 1.1.1) AN/ASQ-235 - AMNS MH-60S Destructor (†) 1.1.1) AN/ASQ-235 - AMNS MH-60S Destructor (†) 1.1.1) AN/ASQ-235 - AMNS MH-60S Destructor (†) 1.1.1) AN/ASQ-235 - AMNS MH-60S Destructor (†) 1.1.1) AN/ASQ-235 - AMNS MH-60S Destructor (†) (†) O O C P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2023 BAE / Portsmouth, UK SS / FP NAVSEA Jun 2023 Jun 2025 33 300,454.54 Y Aug 2019 2024 BAE / Portsmouth, UK SS / FP NAVSEA Jun 2024 Jun 2026 86 216,459.02 Y Aug 2019 2025 BAE / Portsmouth, UK SS / FP NAVSEA Jun 2025 Jun 2027 34 307,617.65 Y Aug 2019 2026 BAE / Portsmouth, UK SS / FP NAVSEA Jun 2026 Jun 2028 62 213,758.06 Y Jun 2025 2027 BAE / Portsmouth, UK SS / FP NAVSEA Jun 2027 Jun 2029 60 217,366.67 N Jun 2025 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 5 of 10 P-1 Line #44 Volume 1 - 569 === page 610 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) AN/ASQ-235 - AMNS - MH-60S Destructor Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 656 1 2023 NAVY 33 0 33 1 2024 NAVY 86 0 86 A - - - - - - - - - - - - - - - - 33 A - - - - 1 2025 NAVY 34 0 34 86 34 1 2026 NAVY 62 0 62 62 1 2027 NAVY 60 0 60 60 O C T N O V LI 4225 - Airborne Mine Neutralization Systems Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #44 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 570 === page 611 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) AN/ASQ-235 - AMNS - MH-60S Destructor Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 656 1 2023 NAVY 33 0 33 - - - - - - - - 10 10 10 1 2024 NAVY 86 0 86 - - - - - - - - - - - - 3 - - - - - - - - 0 1 2025 NAVY 34 0 34 A - - - - - - - - - - - - 1 2026 NAVY 62 0 62 1 2027 NAVY 60 0 60 10 10 10 10 46 - - - - 34 A - - - - 62 60 O C T N O V LI 4225 - Airborne Mine Neutralization Systems Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #44 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 571 === page 612 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) AN/ASQ-235 - AMNS - MH-60S Destructor Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 656 1 2023 NAVY 33 33 0 1 2024 NAVY 86 40 46 10 10 10 10 0 1 2025 NAVY 34 0 34 - - - - - - - - 10 10 10 1 2026 NAVY 62 0 62 - - - - - - - - - - - 1 2027 NAVY 60 0 60 6 0 A O C T N O V LI 4225 - Airborne Mine Neutralization Systems Navy D E C J A N F E B M A R A P R M A Y J U N J U L 0 - A U G UNCLASSIFIED Page 8 of 10 4 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #44 - M A R - A P R 10 M A Y 10 J U N 10 J U L A U G 10 22 - 60 S E P Volume 1 - 572 === page 613 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) AN/ASQ-235 - AMNS - MH-60S Destructor Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 656 1 2023 NAVY 33 33 0 0 1 2024 NAVY 86 86 0 0 1 2025 NAVY 34 34 0 1 2026 NAVY 62 40 22 10 10 1 2027 NAVY 60 0 60 - - 0 O C T N O V LI 4225 - Airborne Mine Neutralization Systems Navy 2 0 D E C J A N F E B M A R A P R M A Y 10 J U N 10 J U L 10 A U G UNCLASSIFIED Page 9 of 10 10 S E P 10 O C T 10 N O V 0 D E C J A N F E B P-1 Line #44 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 573 === page 614 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4225 / Airborne Mine Neutralization Systems Appropriation / Budget Activity / Budget Sub Activity: 1507N / 04 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / ARCHERFISH Mine Neutralization Combat Rounds Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 BAE - Portsmouth, UK 21 480 1,440 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 9 24 Total After Oct 1 ALT Prior to Oct 1 33 ALT After Oct 1 0 Manufacturing PLT 9 Total After Oct 1 24 33 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4225 - Airborne Mine Neutralization Systems Navy UNCLASSIFIED Page 10 of 10 P-1 Line #44 Volume 1 - 574 === page 615 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 06: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 240.697 240.697 240.697 202.425 167.242 202.425 167.242 202.425 167.242 0.000 0.000 0.000 167.242 167.242 167.242 189.946 182.531 - - 189.946 182.531 - - 189.946 182.531 181.332 181.332 181.332 To FY 2031 Complete 184.262 Continuing 184.262 184.262 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Weapons Procurement, Navy (WPN-6) budget line item (BLI) is made up of three budget sub-line items (SUBLIs): SUBLI (20) Initial Spares, SUBLI (30) Torpedo Initial Spares, SUBLI (70) Lay-in and Inventory Augmentation Spares, and SUBLI (90) Vendor Direct/Replenishment spares. Initial spares are components, assemblies, and sub-assemblies that are provided and stocked on active ships, shore sites, and expeditionary units as spare parts for newly fielded weapon systems. Vendor Direct spares are both consumable and repairable parts that are required to replenish stocks for use in maintenance, overhaul, and repair of equipment. Outfitting spares are spare parts that the Navy Supply System has bought in to respond to meet fleet requisitions for newly installed and/or modernized systems. Together they provide for all WPN-6 Spares funding in support of (1) Navy surface ordnance, which consists of all guns, associated equipment (hoists, shields, etc.), and related material support necessary to support fleet readiness capabilities, (2) Anti-Submarine Warfare (ASW) weapons and support equipment, and (3) NAVAIR managed air-launched weapons and associated equipment. Additionally, outfitting spares funding is required for the initial outfitting and repair of expendable item parts, such as guided missile components, and non-recoverable target drone components to address damage incurred while in flight, damage incurred during recovery operations, and for control and telemetry equipment. Navy surface ordnance guns, equipment, and materials consist of the following: - Naval Strike Missile (NSM) - Small Arms and Weapons - Gun Mount Modifications - Airborne Mine Neutralization Systems - Standard Missile - Rolling Airframe Missile (RAM) - Evolved Sea Sparrow Missile (ESSM) - Close-In Weapons System (CIWS) - Coast Guard Weapons (MK-110, MK-160 Gun Control System, MK-38 Machine Gun System) ASW weapons and support equipment consist of the following: - MK-54 Torpedo - MK-48 Torpedo - ASW Range Support Program (Underwater Tracking Range Equipment (UTRE) Program & MK28 Service Weapon Target Test (SWTT) Program) LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 1 of 6 P-1 Line #46 Volume 1 - 575 === page 616 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 06: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A - MK-39 MOD 3 Expendable Mobile ASW (EMATT) - MK-48 Common Broadband Advanced Sonar System (CBASS) Kits - 6T COG (Underwater Mines & Components) - Quickstrike Mine NAVAIR-managed air-launched weapons consist of the following: - Anti-ship, anti-radar, anti-armor, air-to-air, and air-to-surface weapons including Advanced Anti-Radiation Guided Missile (AARGM, AARGM-ER) - High Speed Anti-Radiation Missile (HARM) - Harpoon (air/surface/sub-surface) - Hellfire - Joint Standoff Weapons (JSOW) - Air-to-Surface Guided Missiles or Maverick (AGM-65) - All variants of Long Range Anti-Ship Missile (LRASM) - Airborne Intercept Missile (AIM-9, AIM-120) - Standoff Land Attack Missile - Expanded Response (SLAM-ER) - Small Diameter Bomb Increment II (SDB II) - Joint Air-to-Ground Missiles (JAGM) LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 2 of 6 P-1 Line #46 Volume 1 - 576 === page 617 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 06: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 WPN spares P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 240.697 - / 202.425 - / 167.242 / 0.000 - / 240.697 - / 202.425 - / 167.242 - / - - / 167.242 / 0.000 - / 167.242 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Program Increase Justifications * Initial Spares 2206 / AMRAAM - $0.143M increase supports initial spares procurement for AMRAAM tactical missiles and CATM-120D training variants for the U.S. Marine Corps. This funding ensures operational readiness and training capability in FY27 and addresses critical spares requirements to sustain mission-critical systems and mitigate supply chain risks. 2238 / Small Diameter Bomb II (SDB II) - $0.369M increase supports initial spares for SDB II Early Operational Capability (EOC) on the F-35B for USMC and EOC on the F-35C for the DoN. 2292 / Naval Strike Missile (NSM) - $0.044M increase driven by inflation. 2327 / AARGM-ER - $0.436M increase supports CATM spares not previously procured as well as increased quantities of fins, radomes and stakes that are easily damaged with handling. 3117 / MK-48 Torpedo - $1.157M increase is required to support additional torpedo procurements. 4129 / Small Arms and Weapons - $0.019M increase supports meeting service-common Small Arms inventory objectives for all US Navy forces including Naval Special Warfare and Naval Expeditionary Combat Command. * Replenishment Spares 2234 / Standard Missile - $10.279M increase needed to allocate funds for the Munition Acceleration Council (MAC) requirements to increase qty of SM-6 AURs procured and supported in the fleet. The increased procurement rate of 360 AURs in FY 27 is almost double the procurement amount from FY 26. Increased quantities procured require increase sparing to support the rounds when they return for recert and I or D level repairs. D level repairs are full section replacements. Most items are not repairable. 2242 / Rolling Airframe Missile (RAM) - $5.028M increase needed to address backlog of requirements from FY12-FY17 (no spares funding was available in those years). 2307 / Evolved Sea Sparrow Missile (ESSM) - $3.265M increase needed for spares material to support Depot and ILMF. 3225 / MK-48 Torpedo ADCAP Mods - $3.364M increase required for expected HWT torpedo exercise and warshot material fallout and unit price increases 4206 / Coast Guard Weapons - $0.002M increase driven by inflation. LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 3 of 6 P-1 Line #46 Volume 1 - 577 === page 618 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N: Weapons Procurement, Navy / BA 06: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 4 of 6 P-1 Line #46 Volume 1 - 578 === page 619 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 06 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: WPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) Initial BA 02 - Other Missiles 2206 / AMRAAM - 17.866 1.543 1.686 - 1.686 2209 / Sidewinder - 1.577 2.324 2.116 - 2.116 2238 / Small Diameter Bomb II (SDB II) - 2.313 1.531 1.900 - 1.900 2248 / Joint Air Ground Missile (JAGM) - 0.474 - 0.000 - 0.000 2280 / Aerial Targets - 4.332 4.940 1.919 - 1.919 2291 / LRASM - - 4.081 3.470 - 3.470 2292 / Naval Strike Missile (NSM) - 2.915 2.936 2.980 - 2.980 2327 / AARGM-ER - - 4.688 5.124 - 5.124 3117 / MK-48 Torpedo - 9.256 16.236 11.852 - 11.852 3215 / MK-54 Torpedo Mods - 1.534 1.562 1.523 - 1.523 3225 / MK-48 Torpedo ADCAP Mods - - 0.862 0.000 - 0.000 3231 / Maritime Mines - 1.442 0.258 0.000 - 0.000 4129 / Small Arms and Weapons - 0.227 0.497 0.516 - 0.516 4206 / Coast Guard Weapons - 0.749 0.762 0.738 - 0.738 4217 / Gun Mount Mods - 4.052 4.126 3.990 - 3.990 - 46.737 46.346 37.814 - 37.814 2101 / Tomahawk - 61.128 55.528 14.469 - 14.469 2234 / Standard Missile - 39.859 36.249 46.528 - 46.528 2242 / Rolling Airframe Missile (RAM) - 14.414 11.300 16.328 - 16.328 2280 / Aerial Targets - 2.096 2.148 0.565 - 0.565 2307 / Evolved Sea Sparrow Missile (ESSM) - 9.354 7.330 10.595 - 10.595 9203 / Spares for NAVAIR - 18.519 18.375 14.065 - 14.065 3141 / ASW Targets - 1.914 1.948 1.908 - 1.908 3215 / MK-54 Torpedo Mods - 1.929 1.964 1.931 - 1.931 3225 / MK-48 Torpedo ADCAP Mods - 0.739 0.670 4.034 - 4.034 BA 03 - Torpedoes and Related Equipment BA 04 - Other Weapons Subtotal: Initial Replenishment BA 02 - Other Missiles BA 03 - Torpedoes and Related Equipment LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 5 of 6 P-1 Line #46 Volume 1 - 579 === page 620 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1507N / 06 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 6120 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: WPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) 3302 / ASW Range Support - 0.557 0.568 0.556 - 0.556 6231 / 6T COG - 3.898 3.851 3.356 - 3.356 4205 / Close-In Wpns Sys (CIWS) Mods - 24.730 0.426 0.414 - 0.414 4206 / Coast Guard Weapons - 0.213 0.217 0.219 - 0.219 4217 / Gun Mount Mods - 12.678 12.580 12.360 - 12.360 4225 / Airborne Mine Neutralization Systems - 1.932 2.925 2.100 - 2.100 Subtotal: Replenishment - 193.960 156.079 129.428 - 129.428 Total Cost (Initial + Replenishment) - 240.697 202.425 167.242 - 167.242 BA 04 - Other Weapons LI 6120 - Spares and Repair Parts Navy UNCLASSIFIED Page 6 of 6 P-1 Line #46 Volume 1 - 580