=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 1 of 1 Shipbuilding and Conversion, Navy UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Navy.................................................................................................................................................................................... Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Cost of Report............................................................................................................................................................. Volume 1 - v Introduction and Explanation of Contents..............................................................................................................Volume 1 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - ix Line Item Table of Contents (by Appropriation then Line Number)............................................................... Volume 1 - xxxvii Line Item Table of Contents (Alphabetically by Line Item Title)........................................................................... Volume 1 - xli Executive Summary..................................................................................................................................................Volume 1 - xlv Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === The estimated cost of this report for the Department of the Navy (DON) is $81,774. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === Department of Defense Appropriations Act, 2027 Shipbuilding and Conversion, Navy For expenses necessary for the construction, acquisition, or conversion of vessels as authorized by law, including armor and armament thereof, plant equipment, appliances, and machine tools and installation thereof in public and private plants; reserve plant and Government and contractor-owned equipment layaway; procurement of critical, long lead time components and designs for vessels to be constructed or converted in the future; and expansion of public and private plants, including land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title. In all: $60,176,117,000 to remain available for obligation until September 30, 2031. Provided, that additional obligations may be incurred after September 30, 2031, for engineering services, tests, evaluations, and other such budgeted work that must be performed in the final stage of ship construction. Volume 1 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Shipbuilding and Conversion, Navy 29,442,178 27,151,616 17,930,426 45,082,042 Total Department of the Navy 29,442,178 27,151,616 17,930,426 45,082,042 Grand Total Department of War 29,442,178 27,151,616 17,930,426 45,082,042 UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Shipbuilding and Conversion, Navy 60,176,117 5,648,900 65,825,017 Total Department of the Navy 60,176,117 5,648,900 65,825,017 Grand Total Department of War 60,176,117 5,648,900 65,825,017 UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Shipbuilding and Conversion, Navy 29,442,178 27,151,616 17,930,426 45,082,042 Total Department of the Navy 29,442,178 27,151,616 17,930,426 45,082,042 UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Shipbuilding and Conversion, Navy 60,176,117 5,648,900 65,825,017 Total Department of the Navy 60,176,117 5,648,900 65,825,017 UNCLASSIFIED Volume 1 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Budget Activity Summary (Dollars in Thousands) Appropriation: Shipbuilding and Conversion, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Fleet ballistic missile ships 9,279,594 9,279,594 02. Other warships 25,845,507 14,213,712 10,000,000 24,213,712 03. Amphibious ships 1,787,304 1,028,276 3,433,941 4,462,217 05. Auxiliaries, craft, and prior-year program costs Total Shipbuilding and Conversion, Navy 1,809,367 2,630,034 4,496,485 7,126,519 29,442,178 27,151,616 17,930,426 45,082,042 UNCLASSIFIED Volume 1 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Budget Activity Summary (Dollars in Thousands) Appropriation: Shipbuilding and Conversion, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Fleet ballistic missile ships 14,997,174 205,700 15,202,874 02. Other warships 26,498,015 1,914,380 28,412,395 03. Amphibious ships 6,394,969 1,893,500 8,288,469 05. Auxiliaries, craft, and prior-year program costs 12,285,959 1,635,320 13,921,279 60,176,117 5,648,900 65,825,017 Total Shipbuilding and Conversion, Navy UNCLASSIFIED Volume 1 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Fleet ballistic missile ships Fleet Ballistic Missile Ships 1 COLUMBIA Class Submarine A U 1 (10,744,317) 1 (10,744,317) Less: Advance Procurement (PY) (-3,486,442) (-3,486,442) Less: Subsequent Full Funding (FY) (-3,329,047) (-3,329,047) 3,928,828 3,928,828 5,350,766 5,350,766 Subsequent Full Funding for FY 2026 2 COLUMBIA Class Submarine Advance Procurement (CY) C (FY 2026 for FY 2027) (M) (850,012) (850,012) C (FY 2026 for FY 2028) (M) (1,118,109) (1,118,109) C (FY 2026 for FY 2029) (M) (1,297,169) (1,297,169) C (FY 2026 for FY 2030) (M) (226,717) (226,717) C (FY 2026 for FY 2031) (M) (33,580) (33,580) C (FY 2026 for FY 2032) (M) (8,620) (8,620) C (FY 2026 for FY 2033) (M) (10,955) (10,955) C (FY 2026 for FY 2034) (M) (913) (913) C (FY 2026 for FY 2035) (M) (1,804,691) (1,804,691) C (FY 2027 for FY 2028) (M) UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Fleet ballistic missile ships Fleet Ballistic Missile Ships 1 COLUMBIA Class Submarine Less: Advance Procurement (PY) A U 1 (10,486,369) 1 (10,486,369) (-3,581,584) (-3,581,584) 6,904,785 6,904,785 3,329,047 3,329,047 Less: Subsequent Full Funding (FY) Subsequent Full Funding for FY 2026 2 COLUMBIA Class Submarine Advance Procurement (CY) 4,763,342 205,700 4,969,042 C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) C (FY 2026 for FY 2029) (M) C (FY 2026 for FY 2030) (M) C (FY 2026 for FY 2031) (M) C (FY 2026 for FY 2032) (M) C (FY 2026 for FY 2033) (M) C (FY 2026 for FY 2034) (M) C (FY 2026 for FY 2035) (M) C (FY 2027 for FY 2028) (M) (955,301) UNCLASSIFIED (955,301) Volume 1 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost C (FY 2027 for FY 2029) (M) C (FY 2027 for FY 2030) (M) C (FY 2027 for FY 2031) (M) C (FY 2027 for FY 2032) (M) C (FY 2027 for FY 2033) (M) C (FY 2027 for FY 2034) (M) C (FY 2027 for FY 2035) (M) Total Fleet ballistic missile ships 9,279,594 9,279,594 Budget Activity 02: Other warships Other Warships 3 4 Carrier Replacement Program Subsequent Full Funding for FY 2018 1,123,124 1,046,700 1,046,700 Completion PY Shipbuild for FY 2013 236,000 150,000 150,000 612,038 612,038 (612,038) (612,038) Carrier Replacement Program Advance Procurement (CY) C (FY 2026 for FY 2030) (M) C (FY 2027 for FY 2029) (M) 5 CVN-81 UNCLASSIFIED Volume 1 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost C (FY 2027 for FY 2029) (M) (1,455,979) (1,455,979) C (FY 2027 for FY 2030) (M) (1,202,901) (1,202,901) C (FY 2027 for FY 2031) (M) (112,759) (112,759) C (FY 2027 for FY 2032) (M) (55,890) (55,890) C (FY 2027 for FY 2033) (M) (8,099) (8,099) C (FY 2027 for FY 2034) (M) (11,199) C (FY 2027 for FY 2035) (M) (961,214) (205,700) (1,166,914) 14,997,174 205,700 15,202,874 641,907 37,000 678,907 Total Fleet ballistic missile ships (11,199) Budget Activity 02: Other warships Other Warships 3 Carrier Replacement Program Subsequent Full Funding for FY 2018 Completion PY Shipbuild for FY 2013 4 Carrier Replacement Program Advance Procurement (CY) 1,940,566 1,940,566 (1,940,566) (1,940,566) C (FY 2026 for FY 2030) (M) C (FY 2027 for FY 2029) (M) 5 CVN-81 UNCLASSIFIED Volume 1 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost Subsequent Full Funding for FY 2020 6 Virginia Class Submarine Less: Advance Procurement (PY) Subsequent Full Funding for FY 2024 FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost 674,930 B U 1 (9,500,534) Cost Qty Cost 1,622,935 1 (5,389,109) (-2,143,630) (-2,648,804) 7,356,904 2,740,305 1,622,935 1 (4,600,000) 2 (9,989,109) (-2,648,804) 4,600,000 7,340,305 1,950,000 Completion PY Shipbuild for FY 2016 7 Qty FY 2026 Total 121,538 121,538 Completion PY Shipbuild for FY 2017 219,370 99,116 99,116 Completion PY Shipbuild for FY 2018 73,634 289,761 289,761 3,720,303 3,126,816 3,126,816 Virginia Class Submarine Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (1,228,216) C (FY 2025 for FY 2027) (M) (1,842,912) C (FY 2025 for FY 2028) (M) (324,587) C (FY 2025 for FY 2029) (M) (324,588) C (FY 2026 for FY 2027) (M) (919,800) (919,800) C (FY 2026 for FY 2028) (M) (1,841,062) (1,841,062) C (FY 2026 for FY 2029) (M) (235,954) (235,954) C (FY 2026 for FY 2034) (M) (130,000) (130,000) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) C (FY 2027 for FY 2034) (M) UNCLASSIFIED Volume 1 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost Subsequent Full Funding for FY 2020 6 Virginia Class Submarine Less: Advance Procurement (PY) FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 1,447,882 B U 2 1,447,882 (11,437,036) 2 (11,437,036) (-3,034,720) (-3,034,720) 8,402,316 8,402,316 Subsequent Full Funding for FY 2024 Completion PY Shipbuild for FY 2016 Completion PY Shipbuild for FY 2017 Completion PY Shipbuild for FY 2018 7 Virginia Class Submarine Advance Procurement (CY) 4,143,618 1,440,000 5,583,618 C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2025 for FY 2028) (M) C (FY 2025 for FY 2029) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) C (FY 2026 for FY 2029) (M) C (FY 2026 for FY 2034) (M) C (FY 2027 for FY 2028) (M) (698,102) C (FY 2027 for FY 2029) (M) (1,677,346) C (FY 2027 for FY 2034) (M) (1,768,170) UNCLASSIFIED (698,102) (1,677,346) (1,440,000) (3,208,170) Volume 1 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 8 Surface Ship Industrial Base 9 BBG(X) FY 2025 Actuals Ident Code Sec A U A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Advance Procurement (CY) C (FY 2027 for FY 2028) (M) 10 CVN Refueling Overhauls 1 (8,010,129) Less: Advance Procurement (PY) (-1,201,073) Less: Subsequent Full Funding (FY) (-5,997,913) 811,143 Subsequent Full Funding for FY 2025 Completion PY Shipbuild for FY 2020 11 1,579,011 1,579,011 669,171 483,100 483,100 61,100 52,358 52,358 (7,858,814) (306,125) (-1,590,295) (-295,352) 6,268,519 10,773 CVN Refueling Overhauls Advance Procurement (CY) C (FY 2027 for FY 2031) (M) 12 DDG 1000 A U 13 DDG-51 A U Less: Advance Procurement (PY) 3 UNCLASSIFIED 2 (5,400,000) 2 (5,706,125) (-295,352) 5,400,000 5,410,773 Volume 1 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 8 Surface Ship Industrial Base 9 BBG(X) FY 2027 Discretionary Request Ident Code Sec A U Qty Cost C (FY 2027 for FY 2028) (M) CVN Refueling Overhauls A Qty Cost FY 2027 Total Qty Cost 93,380 Advance Procurement (CY) 10 FY 2027 Mandatory Request 93,380 1,000,000 1,000,000 (1,000,000) (1,000,000) U Less: Advance Procurement (PY) Less: Subsequent Full Funding (FY) Subsequent Full Funding for FY 2025 4,418,902 30,000 4,448,902 Completion PY Shipbuild for FY 2020 11 CVN Refueling Overhauls Advance Procurement (CY) C (FY 2027 for FY 2031) (M) 12 DDG 1000 A U 13 DDG-51 A U Less: Advance Procurement (PY) 1 53,070 53,070 (53,070) (53,070) 66,516 66,516 (4,256,914) (314,000) (-1,302,676) 2,954,238 UNCLASSIFIED 1 (4,570,914) (-1,302,676) 314,000 3,268,238 Volume 1 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 14 FY 2025 Actuals Ident Code Sec 16 Cost Qty Subsequent Full Funding for FY 2023 923,808 Subsequent Full Funding for FY 2024 759,563 Cost Qty Cost FY 2026 Total Qty Cost Completion PY Shipbuild for FY 2016 10,509 14,892 14,892 Completion PY Shipbuild for FY 2017 115,600 62,365 62,365 Completion PY Shipbuild for FY 2018 107,405 104,238 104,238 83,224 1,750,000 1,750,000 C (FY 2026 for FY 2027) (M) (1,000,000) (1,000,000) C (FY 2026 for FY 2034) (M) (750,000) (750,000) 5,766 5,766 100,000 100,000 DDG-51 Advance Procurement (CY) 15 Qty FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan C (FY 2025 for FY 2026) (M) (62,362) C (FY 2025 for FY 2027) (M) (20,862) Littoral Combat Ship Completion PY Shipbuild for FY 2017 8,100 Completion PY Shipbuild for FY 2018 12,000 Completion PY Shipbuild for FY 2019 27,900 FFG-Frigate A U Subsequent Full Funding for FY 2024 233,200 Completion PY Shipbuild for FY 2020 105,413 Completion PY Shipbuild for FY 2021 76,580 Completion PY Shipbuild for FY 2022 64,940 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Subsequent Full Funding for FY 2023 Subsequent Full Funding for FY 2024 Completion PY Shipbuild for FY 2016 Completion PY Shipbuild for FY 2017 Completion PY Shipbuild for FY 2018 14 DDG-51 Advance Procurement (CY) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2034) (M) 15 Littoral Combat Ship Completion PY Shipbuild for FY 2017 Completion PY Shipbuild for FY 2018 Completion PY Shipbuild for FY 2019 16 FFG-Frigate Subsequent Full Funding for FY 2024 Completion PY Shipbuild for FY 2020 Completion PY Shipbuild for FY 2021 Completion PY Shipbuild for FY 2022 UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 17 FY 2025 Actuals Ident Code Sec Qty Cost Qty Completion PY Shipbuild for FY 2023 54,308 Completion PY Shipbuild for FY 2024 98,759 FF(X) A FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan U Cost Qty Cost 242,000 Total Other warships 25,845,507 14,213,712 FY 2026 Total Qty Cost 242,000 10,000,000 24,213,712 252,125 252,125 Budget Activity 03: Amphibious ships Amphibious Ships 18 LPD Flight II A U 1 (2,315,088) Less: Advance Procurement (PY) (-501,000) Less: Subsequent Full Funding (FY) (-252,125) 1,561,963 Subsequent Full Funding for FY 2025 Completion PY Shipbuild for FY 2018 19 19,158 93,442 93,442 LPD Flight II Advance Procurement (CY) 627,912 627,912 C (FY 2026 for FY 2027) (M) (339,000) (339,000) C (FY 2026 for FY 2029) (M) (288,912) (288,912) C (FY 2027 for FY 2028) (M) UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Completion PY Shipbuild for FY 2023 Completion PY Shipbuild for FY 2024 17 FF(X) 1 Total Other warships 1,429,000 1 26,498,015 1,914,380 (2,527,700) (4,000) 1,429,000 28,412,395 Budget Activity 03: Amphibious ships Amphibious Ships 18 LPD Flight II Less: Advance Procurement (PY) A U 1 (-339,000) 1 (2,531,700) (-339,000) Less: Subsequent Full Funding (FY) 2,188,700 4,000 2,192,700 Subsequent Full Funding for FY 2025 Completion PY Shipbuild for FY 2018 19 LPD Flight II Advance Procurement (CY) 355,950 355,950 (355,950) (355,950) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2029) (M) C (FY 2027 for FY 2028) (M) UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 20 FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Cost Qty Cost Expeditionary Sea Base (ESB) Completion PY Shipbuild for FY 2022 21 Qty FY 2026 Total LHA Replacement A 30,000 30,000 93,603 93,603 U Less: Advance Procurement (PY) Less: Subsequent Full Funding (FY) Completion PY Shipbuild for FY 2017 22 115,397 LHA Replacement Advance Procurement (CY) 61,118 C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) 23 (589,963) (589,963) Medium Landing Ship 11,231 A U (29,668) 2 (800,000) Less: Advance Procurement (PY) 29,668 25 589,963 Expeditionary Fast Transport (EPF) Completion PY Shipbuild for FY 2022 24 589,963 (61,118) 800,000 11,231 8 (1,963,941) 10 (2,763,941) (-160,000) (-160,000) 1,803,941 2,603,941 160,000 160,000 Medium Landing Ship Advance Procurement (CY) UNCLASSIFIED Volume 1 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 20 FY 2027 Discretionary Request Ident Code Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Expeditionary Sea Base (ESB) Completion PY Shipbuild for FY 2022 21 LHA Replacement Less: Advance Procurement (PY) 1 (4,792,500) (2,000) 1 (-940,081) Less: Subsequent Full Funding (FY) (4,794,500) (-940,081) (-2,100) (-2,100) 3,850,319 2,000 3,852,319 Completion PY Shipbuild for FY 2017 22 LHA Replacement Advance Procurement (CY) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) 23 Expeditionary Fast Transport (EPF) Completion PY Shipbuild for FY 2022 24 Medium Landing Ship A U 6 (1,887,500) 6 (1,887,500) Less: Advance Procurement (PY) 1,887,500 25 1,887,500 Medium Landing Ship Advance Procurement (CY) UNCLASSIFIED Volume 1 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost C (FY 2026 for FY 2026) (M) Total Amphibious ships 1,787,304 1,028,276 FY 2026 Total Qty Cost (160,000) (160,000) 3,433,941 4,462,217 Budget Activity 05: Auxiliaries, craft, and prior-year program costs Auxiliaries, Craft and Prior Yr Program Cost 26 As Submarine Tender U 27 SMS-Special Mission Ship A U 28 TAO Fleet Oiler A U 8,346 3 2,733,346 49,995 15,400 15,400 Completion PY Shipbuild for FY 2020 151,837 48,260 48,260 Completion PY Shipbuild for FY 2022 13,222 19,650 19,650 Completion PY Shipbuild for FY 2023 12,100 6,530 6,530 6,200 6,200 Next Generation Logistics Ship Advance Procurement (CY) C (FY 2026 for FY 2031) (M) 31 2,725,000 Completion PY Shipbuild for FY 2019 Completion PY Shipbuild for FY 2024 30 3 Tagos Surtass Ships A U 1 UNCLASSIFIED 612,205 100,000 100,000 (100,000) (100,000) 1 612,205 Volume 1 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost C (FY 2026 for FY 2026) (M) Total Amphibious ships 6,394,969 1,893,500 8,288,469 Budget Activity 05: Auxiliaries, craft, and prior-year program costs Auxiliaries, Craft and Prior Yr Program Cost 26 As Submarine Tender U 2 27 SMS-Special Mission Ship A U 28 TAO Fleet Oiler A U 2 A U 1 4,444,000 2 4,444,000 200,000 1 200,000 1,946,063 282,820 2 2,228,883 610,664 100,000 1 710,664 1 Completion PY Shipbuild for FY 2019 Completion PY Shipbuild for FY 2020 Completion PY Shipbuild for FY 2022 Completion PY Shipbuild for FY 2023 Completion PY Shipbuild for FY 2024 30 Next Generation Logistics Ship Advance Procurement (CY) C (FY 2026 for FY 2031) (M) 31 Tagos Surtass Ships UNCLASSIFIED Volume 1 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 32 Towing, Salvage, and Rescue Ship (ATS) FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec A U Qty Cost Qty Cost Qty Cost Qty Cost 141,500 Completion PY Shipbuild for FY 2016 141,500 60,000 Completion PY Shipbuild for FY 2018 72,650 72,650 1,650 1,650 Completion PY Shipbuild for FY 2020 978 5,693 5,693 Completion PY Shipbuild for FY 2021 17,375 400,978 400,978 Completion PY Shipbuild for FY 2022 4,234 9,946 9,946 9,083 9,083 Completion PY Shipbuild for FY 2023 33 FY 2026 Total Oceanographic Ships Completion PY Shipbuild for FY 2018 18,000 6,015 6,015 34 LCU 1700 A U 9 295,000 9 295,000 35 Strategic Sealift A U 1 600,000 1 600,000 36 Outfitting A U 37 Ship to Shore Connector A U 38 585,967 3 480,000 886,846 2 320,000 886,846 1 239,095 3 559,095 Completion PY Shipbuild for FY 2018 14,694 Completion PY Shipbuild for FY 2019 33,345 15,480 15,480 41,426 174,602 174,602 Service Craft A U UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature 32 Towing, Salvage, and Rescue Ship (ATS) FY 2027 Discretionary Request Ident Code Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Completion PY Shipbuild for FY 2016 Completion PY Shipbuild for FY 2018 Completion PY Shipbuild for FY 2020 Completion PY Shipbuild for FY 2021 Completion PY Shipbuild for FY 2022 Completion PY Shipbuild for FY 2023 33 Oceanographic Ships Completion PY Shipbuild for FY 2018 34 LCU 1700 A U 35 Strategic Sealift A U 36 Outfitting A U 37 Ship to Shore Connector A U A U 1 450,000 1 741,270 4 733,895 450,000 741,270 4 733,895 Completion PY Shipbuild for FY 2018 Completion PY Shipbuild for FY 2019 38 Service Craft 177,079 UNCLASSIFIED 177,079 Volume 1 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 39 Auxiliary Personnel Lighter A U 40 Bulk Fuel Vessel A U 41 T-AH(X) A U 42 Fireboats A U 43 LCAC SLEP A U 2 45,087 44 Auxiliary Vessels (Used Sealift) A U 2 204,939 45 Completion of PY Shipbuilding Programs A U Cost 76,168 Qty Cost FY 2026 Total Qty Cost 79,000 79,000 1 2 290,000 37,390 1 37,390 2 290,000 AUX (MEMO NON ADD) LHA R (MEMO NON ADD) CVN (MEMO NON ADD) SSN-774 (MEMO NON ADD) UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost 39 Auxiliary Personnel Lighter A U 40 Bulk Fuel Vessel A U 41 T-AH(X) A U 1 42 Fireboats A U 5 43 LCAC SLEP A U 44 Auxiliary Vessels (Used Sealift) A U 45 Completion of PY Shipbuilding Programs A U FY 2027 Total Qty Cost 83,000 1 2 83,000 450,000 1 450,000 650,000 1 650,000 272,500 5 272,500 2 37,998 1 130,000 37,998 1 130,000 2,611,990 2,611,990 AUX (MEMO NON ADD) (241,501) (241,501) LHA R (MEMO NON ADD) (164,300) (164,300) CVN (MEMO NON ADD) (324,000) (324,000) SSN-774 (MEMO NON ADD) (605,375) (605,375) UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost CVN RCOH (MEMO NON ADD) Columbia Class Submarine (MEMO NON ADD) LCS (MEMO NON ADD) JHSV (MEMO NON ADD) DDG (MEMO NON ADD) LPD 17 (MEMO NON ADD) AFSB (MEMO NON ADD) Total Auxiliaries, craft, and prior-year program costs 1,809,367 2,630,034 4,496,485 7,126,519 Total Shipbuilding and Conversion, Navy 29,442,178 27,151,616 17,930,426 45,082,042 UNCLASSIFIED Volume 1 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1611N Detail (Dollars in Thousands) Appropriation: 1611 Shipbuilding and Conversion, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost CVN RCOH (MEMO NON ADD) (379,200) (379,200) Columbia Class Submarine (MEMO NON ADD) (585,928) (585,928) LCS (MEMO NON ADD) (9,450) (9,450) JHSV (MEMO NON ADD) (8,423) (8,423) DDG (MEMO NON ADD) (178,224) (178,224) LPD 17 (MEMO NON ADD) (103,489) (103,489) AFSB (MEMO NON ADD) (12,100) (12,100) Total Auxiliaries, craft, and prior-year program costs 12,285,959 1,635,320 13,921,279 Total Shipbuilding and Conversion, Navy 60,176,117 5,648,900 65,825,017 UNCLASSIFIED Volume 1 - xxxvi === page 39 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 1045 COLUMBIA Class Submarine................................................................................................................Volume 1 - 1 2 01 01 1045 COLUMBIA Class Submarine, Advance Procurement........................................................................ Volume 1 - 27 Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 3 02 01 2001 Carrier Replacement Program............................................................................................................. Volume 1 - 43 4 02 01 2001 Carrier Replacement Program, Advance Procurement....................................................................... Volume 1 - 83 5 02 01 2004 CVN-81.................................................................................................................................................Volume 1 - 85 6 02 01 2013 Virginia Class Submarine...................................................................................................................Volume 1 - 123 7 02 01 2013 Virginia Class Submarine, Advance Procurement............................................................................. Volume 1 - 141 8 02 01 2056 BBG(X)............................................................................................................................................... Volume 1 - 145 9 02 01 2056 BBG(X), Advance Procurement......................................................................................................... Volume 1 - 149 10 02 01 2086 CVN Refueling Overhauls..................................................................................................................Volume 1 - 151 UNCLASSIFIED Volume 1 - xxxvii === page 40 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 11 02 01 2086 CVN Refueling Overhauls, Advance Procurement............................................................................ Volume 1 - 185 12 02 01 2119 DDG 1000.......................................................................................................................................... Volume 1 - 187 13 02 01 2122 DDG-51.............................................................................................................................................. Volume 1 - 213 14 02 01 2122 DDG-51, Advance Procurement........................................................................................................ Volume 1 - 243 15 02 01 2127 Littoral Combat Ship (LCS)................................................................................................................Volume 1 - 247 16 02 01 2128 FFG-Frigate........................................................................................................................................ Volume 1 - 251 17 02 01 2133 FF(X).................................................................................................................................................. Volume 1 - 255 Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 18 03 01 3010 LPD Flight II....................................................................................................................................... Volume 1 - 273 19 03 01 3010 LPD Flight II, Advance Procurement................................................................................................. Volume 1 - 293 20 03 01 3039 Expeditionary Sea Base (ESB)..........................................................................................................Volume 1 - 295 21 03 01 3041 LHA Replacement.............................................................................................................................. Volume 1 - 299 22 03 01 3041 LHA Replacement, Advance Procurement........................................................................................ Volume 1 - 331 23 03 01 3043 Expeditionary Fast Transport (EPF).................................................................................................. Volume 1 - 333 UNCLASSIFIED Volume 1 - xxxviii === page 41 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title 24 03 01 Medium Landing Ship........................................................................................................................ Volume 1 - 337 3050 Page Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 26 05 01 5010 AS Submarine Tender....................................................................................................................... Volume 1 - 349 28 05 01 5025 TAO Fleet Oiler..................................................................................................................................Volume 1 - 359 31 05 01 5030 TAGOS Surtass Ships....................................................................................................................... Volume 1 - 369 32 05 01 5035 Towing, Salvage, and Rescue Ship (ATS)........................................................................................ Volume 1 - 377 33 05 01 5087 Oceanographic Ships.........................................................................................................................Volume 1 - 383 34 05 01 5100 LCU 1700...........................................................................................................................................Volume 1 - 387 35 05 01 5104 Strategic Sealift.................................................................................................................................. Volume 1 - 393 36 05 01 5110 Outfitting............................................................................................................................................. Volume 1 - 397 37 05 01 5112 Ship to Shore Connector................................................................................................................... Volume 1 - 411 38 05 01 5113 Service Craft...................................................................................................................................... Volume 1 - 419 39 05 01 5114 Auxiliary Personnel Lighter................................................................................................................ Volume 1 - 429 40 05 01 5118 Bulk Fuel Vessel................................................................................................................................ Volume 1 - 433 UNCLASSIFIED Volume 1 - xxxix === page 42 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1611N: Shipbuilding and Conversion, Navy Line # BA BSA Line Item Number Line Item Title Page 43 05 01 5139 LCAC SLEP....................................................................................................................................... Volume 1 - 439 44 05 01 5201 Auxiliary Vessels (Used Sealift).........................................................................................................Volume 1 - 443 45 05 01 5300 Completion of PY Shpbldg Progr.......................................................................................................Volume 1 - 447 UNCLASSIFIED Volume 1 - xl === page 43 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AS Submarine Tender 5010 26 05 01................... Volume 1 - 349 Auxiliary Personnel Lighter 5114 39 05 01................... Volume 1 - 429 Auxiliary Vessels (Used Sealift) 5201 44 05 01................... Volume 1 - 443 BBG(X) 2056 8 02 01................... Volume 1 - 145 BBG(X), Advance Procurement 2056 9 02 01................... Volume 1 - 149 Bulk Fuel Vessel 5118 40 05 01................... Volume 1 - 433 COLUMBIA Class Submarine 1045 1 01 01....................... Volume 1 - 1 COLUMBIA Class Submarine, Advance Procurement 1045 2 01 01..................... Volume 1 - 27 CVN Refueling Overhauls 2086 10 02 01................... Volume 1 - 151 CVN Refueling Overhauls, Advance Procurement 2086 11 02 01................... Volume 1 - 185 CVN-81 2004 5 02 01..................... Volume 1 - 85 Carrier Replacement Program 2001 3 02 01..................... Volume 1 - 43 Carrier Replacement Program, Advance Procurement 2001 4 02 01..................... Volume 1 - 83 Completion of PY Shpbldg Progr 5300 45 05 01................... Volume 1 - 447 DDG 1000 2119 12 02 01................... Volume 1 - 187 DDG-51 2122 13 02 01................... Volume 1 - 213 DDG-51, Advance Procurement 2122 14 02 01................... Volume 1 - 243 UNCLASSIFIED Volume 1 - xli === page 44 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Expeditionary Fast Transport (EPF) 3043 23 03 01................... Volume 1 - 333 Expeditionary Sea Base (ESB) 3039 20 03 01................... Volume 1 - 295 FF(X) 2133 17 02 01................... Volume 1 - 255 FFG-Frigate 2128 16 02 01................... Volume 1 - 251 LCAC SLEP 5139 43 05 01................... Volume 1 - 439 LCU 1700 5100 34 05 01................... Volume 1 - 387 LHA Replacement 3041 21 03 01................... Volume 1 - 299 LHA Replacement, Advance Procurement 3041 22 03 01................... Volume 1 - 331 LPD Flight II 3010 18 03 01................... Volume 1 - 273 LPD Flight II, Advance Procurement 3010 19 03 01................... Volume 1 - 293 Littoral Combat Ship (LCS) 2127 15 02 01................... Volume 1 - 247 Medium Landing Ship 3050 24 03 01................... Volume 1 - 337 Oceanographic Ships 5087 33 05 01................... Volume 1 - 383 Outfitting 5110 36 05 01................... Volume 1 - 397 Service Craft 5113 38 05 01................... Volume 1 - 419 Ship to Shore Connector 5112 37 05 01................... Volume 1 - 411 Strategic Sealift 5104 35 05 01................... Volume 1 - 393 TAGOS Surtass Ships 5030 31 05 01................... Volume 1 - 369 TAO Fleet Oiler 5025 28 05 01................... Volume 1 - 359 Towing, Salvage, and Rescue Ship (ATS) 5035 32 05 01................... Volume 1 - 377 UNCLASSIFIED Volume 1 - xlii === page 45 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Virginia Class Submarine 2013 6 02 01................... Volume 1 - 123 Virginia Class Submarine, Advance Procurement 2013 7 02 01................... Volume 1 - 141 UNCLASSIFIED Volume 1 - xliii === page 46 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xliv === page 47 === Executive Summary for Shipbuilding and Conversion, Navy Table 1: FundingOverview Discretionary Mandatory Total FY 2025 ($K) $ 29,442,178 $ $ 29,442,178 FY 2026 ($K) $ 27,151,616 $ 17,930,426 $ 45,082,042 FY 2027 ($K) $ 60,176,117 $ 5,648,900 $ 65,825,017 Table 2: Detailed Mandatory Breakout BLI 1045 2001 2013 2013 2044 2086 2122 2122 3010 3010 3041 3041 3050 3050 5018 5025 5025 5028 5030 5035 5100 5104 5112 5123 5128 5139 5201 Mandatory Total Reconciliation Bin Title Maritime Superiority Maritime Superiority Shipbuilding Maritime Superiority Maritime Superiority Maritime Superiority Shipbuilding Maritime Superiority Shipbuilding Maritime Superiority Shipbuilding Maritime Superiority Shipbuilding Maritime Superiority Maritime Superiority Shipbuilding Maritime Superiority Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Shipbuilding Shipbuilding Maritime Superiority Maritime Superiority Shipbuilding Maritime Superiority FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - FY 2026 ($K) $ $ $ 4,600,000 $ $ $ $ 5,400,000 $ $ 880,037 $ $ 589,963 $ $ 1,963,941 $ $ $ 2,725,000 $ $ 100,000 $ $ 500,000 $ 295,000 $ 600,000 $ 239,095 $ $ $ 37,390 $ $ 17,930,426 FY 2027 ($K) $ 205,700 $ 37,000 $ $ 1,440,000 $ 93,380 $ 30,000 $ $ 314,000 $ $ 4,000 $ $ 2,000 $ $ 1,887,500 $ 200,000 $ 282,820 $ 100,000 $ $ $ $ $ 650,000 $ 272,500 $ $ 130,000 $ 5,648,900 Volume 1 - xlv === page 48 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Shipbuilding and Conversion, Navy includes $60,176,117 thousand of discretionary and $5,648,900 thousand of mandatory for a total of $65,825,017 thousand. The mandatory funds support: Landing Ship Medium: The Navy’s FY 2027 budget request includes $1,698 million for the purchase of 6 McClung Class Medium Landing Ships. Submarine Industrial Base Contract Incentives: The Navy’s FY 2027 budget request includes $1,440 million for the Nuclear Shipbuilder Productivity Enhancements (NSPE), direct investment in the nuclear shipbuilders, General Dynamics Electric Boat (EB) and Huntington Ingalls Industries Newport News Shipbuilding (NNS). EB and NNS are structured such that each shipyard produces specific components of each Virginia Class Submarine, which are then assembled. Submarine Capacity and Long-Term Enhancement (SCALE) will increase capacity and promote contracting competition by duplicating capabilities such that each shipyard is capable of independently producing most VCS components. Surface Ship Maritime Industrial Base: The Navy’s FY 2027 budget request includes $1,053 million for investments in the Surface Ship Maritime Industrial Base in order to meet increased demand for new construction, including Golden Fleet ships. Investments include supplier development, shipyard infrastructure, strategic outsourcing, workforce development, technology opportunities, government oversight, and shipyard firefighting upgrades to meet Industrial Ship Safety Manual for Fire Prevention and Response requirements. T-AH(X) Hospital Ships: The Navy’s FY 2027 budget request includes $650 million for the purchase of one Hospital Ship (TAH(X)s) that will begin to replace current hospital ships USNS Comfort and USNS Mercy. Fireboats: The Navy’s FY 2027 budget request includes $273 million for the purchase of five fireboats, specialized boats for fighting shipboard and shoreline fires in Navy ports. The Navy will purchase one fireboat for each of the naval stations and bases at Norfolk, Bremerton, San Diego, Pearl Harbor, and Mayport, and will transfer primary ownership of the fireboats to local fire departments or alternative appropriate organizations for dual federal and local use. Submarine Maritime Industrial Base: The Navy’s FY 2027 mandatory budget request includes in addition to the FY 2027 discretionary request $206 million for investments in the Submarine Industrial Base to promote facilities investment and vendor qualification to improve industrial capacity and reduce construction schedule risk in order to achieve a “1+2” production cadence for Volume 1 - xlvi === page 49 === Columbia Class Submarines and Virginia Class Submarines. Submarine Industrial Base investments include supplier development, shipbuilder infrastructure, strategic sourcing, workforce development, technology opportunities, depot material, and government oversight. Mandatory funding for the Submarine Industrial Base invests in supplier development ($125M), workforce development ($78M), and shipyard infrastructure ($3M). Special Mission Ship: The Navy’s FY 2027 budget request includes $200 million for the purchase of one special mission ship for SOUTHCOM for counter-drug, manned and unmanned deep-sea diving, rescue, salvage, and research missions. Used Sealift: The Navy’s FY 2027 budget request includes $130 million for the purchase of one Used Sealift Vessel. This vessel will be placed in the Ready Reserve Fleet (RRF). As a key element of strategic sealift, the RRF is specifically structured to transport military unit equipment and supplies during the initial surge of U.S. combat forces deploying anywhere in the world. The FY 2026 spend plan for Shipbuilding and Conversion, Navy includes $27,151,616 thousand of discretionary and $17,930,426 thousand of mandatory for a total of $45,082,042 thousand. Volume 1 - xlvii === page 50 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xlviii === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 01: Fleet Ballistic Missile Ships / BSA 1: Fleet Ballistic Missile Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Program Elements for Code B Items: N/A Other Related Program Elements: 0603595N, 0603570N Line Item MDAP/MAIS Code: 444 Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2 26,810.410 Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Subsequent Year Full Funding ($ in Millions) Less AP Transfer to NSBDF ($ in Millions) Less Full Funding Transfer to NSBDF ($ in Millions) - 0.000 850.012 - 9,447.058 - 3,329.047 9,726.054 - 3,486.442 5,312.622 - - - Full Funding TOA ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Plus Cost To Complete ($ in Millions) - - Millions) Total Obligation Authority ($ in Millions) 10,486.369 - 0.000 Millions) 10,744.317 - *.*** Plus Full Funding Transfer to NSBDF ($ in 1 - Plus Subsequent Year Full Funding ($ in FY 2027 OOC 1 2,324.676 Net Procurement (P-1) ($ in Millions) Plus AP Transfer to NSBDF ($ in Millions) FY 2027 Base FY 2026 3,928.828 FY 2027 Total - FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 1 1 1 1 1 4 12 0.000 10,486.369 10,137.078 10,360.998 10,441.001 10,693.082 56,767.864 146,441.119 - 850.012 2,073.410 3,928.382 4,156.600 4,366.050 25,447.052 40,821.506 - - - - - - - - 2,324.676 - - - - - - - - 12,776.105 2,731.572 - - 2,731.572 - - 1,684.646 - - - - - 5,312.622 - 3,329.047 3,928.828 10,233.832 - 10,233.832 6,379.022 6,057.819 6,011.645 6,303.401 25,624.039 64,538.586 5,350.766 4,763.342 - 4,763.342 5,363.445 4,916.623 6,078.750 5,716.743 8,631.837 40,821.506 585.928 - 585.928 1,092.396 377.039 269.313 - - 25,624.039 23,996.671 3,329.047 - 6,303.401 5,696.773 6,904.785 - 6,011.645 23.631 0.000 - 6,057.819 272.756 6,904.785 - 6,379.022 374.797 - 61,209.539 3,329.047 - - 2,324.676 17,780.732 6,215.939 - - - - - - - - - 23,996.671 11,394.845 3,364.835 - - - - - - - - - 14,759.680 29,175.577 9,580.774 9,279.594 15,583.102 0.000 15,583.102 12,834.863 11,351.481 12,359.708 12,020.144 34,255.876 146,441.119 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 10.742 17.175 46.987 32.988 - 32.988 122.109 174.607 171.221 169.424 2,386.498 3,131.751 Total ($ in Millions) 29,186.319 9,597.949 9,326.581 15,616.090 - 15,616.090 12,956.972 11,526.088 12,530.929 12,189.568 36,642.374 149,572.870 Gross/Weapon System Unit Cost ($ in Millions) 13,405.205 10,744.317 10,486.369 - 10,486.369 10,137.078 10,360.998 10,441.001 10,693.082 14,191.966 12,203.427 - Description: MISSION: Strategic Deterrence. The COLUMBIA Class Program is an Acquisition Category (ACAT) ID Major Defense Acquisition Program (MDAP) to design, construct, and deliver a replacement for the OHIO Class Fleet Ballistic Missile Submarines (SSBNs), which begin retiring at a rate of one per year beginning in 2027. The mission of the COLUMBIA SSBN is to maintain an appropriate state of readiness to assist in deterring nuclear attack on the United States and its allies. In the event deterrence should fail, the force must be capable of launching missiles against pre-planned or adaptively planned targets. To fulfill this mission COLUMBIA SSBNs must be capable of performing extended strategic deterrent patrols without requiring assistance or replenishment. It does not have a requirement for additional capabilities or other missions unrelated to survivable strategic nuclear deterrence. Armament: Torpedo Tubes Ballistic Missile Tubes LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 1 of 25 P-1 Line #1 Volume 1 - 1 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 01: Fleet Ballistic Missile Ships / BSA 1: Fleet Ballistic Missile Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Program Elements for Code B Items: N/A Other Related Program Elements: 0603595N, 0603570N Line Item MDAP/MAIS Code: 444 Major Electronics: Trident D5 Strategic Weapons System Command, Control, Communications and Intelligence System - Open System Architecture - Twenty-three Subsystems The FY 2027 request for COLUMBIA Class Submarine includes $14,997,174 thousand and quantity of 1 of discretionary and $205,700 thousand and quantity of 0 of mandatory for a total of $15,202,874 thousand and a quantity of 1. $205,700 thousand of the mandatory funds will support Maritime Industrial Base staffing, campaign transition, and Alternative Turbine Generators. These investment efforts will support improvements in the Maritime Industrial base execution to support the Navy plan of serial production of 1 COLUMBIA plus 2 VIRGINIAs. Note: The FY 2027 budget reflects the addition of two more COLUMBIA ships' (SSBN838 and SSBN839) advanced procurement (AP) funding beginning in FY 2028, which allows for ordering long-lead materials and executing life-of-type buys. This timing is essential to avoid breaks in current production lines and prevent the need for additional component redesign efforts. The addition of SSBN838 and SSBN839 is tentative pending the Navy SSBN Force Structure study. FY2027 is the second and final year of incremental full funding for the third ship, SSBN 828, and full funding for the fourth ship, SSBN 829. Additionally, FY2027 funds the COLUMBIA Class Program to the NAVSEA 05C's 2024 cost estimate and preliminary Build II (SSBN 828-832) contract negotiations. FY2027 is also the first year of Cost to Complete for Build I (SSBN 826-827), which will continue through FY2030. The budget also includes continuing Integrated Enterprise Plan (IEP) funding initiatives, material procurement for future ships, and funding for the Maritime Industrial Base (MIB) (previously referred to as the Submarine Industrial Base/SIB). These MIB investments provide enterprise funding to strengthen the MIB to support a generational increase in submarine demand and includes supplier development, shipbuilder/supplier infrastructure, workforce development, technology opportunities, and strategic outsourcing. Investments are targeted to support uplift of the MIB to achieve a "1+2 " Production Cadence, strengthening the MIB and reprioritizing/growing infrastructure to support new construction goals and increased demand as well as improved maintenance and sustainment for the submarine fleet. FY2027 reflects funding to the NAVSEA 05C's 2024 cost estimate as well as to the results of preliminary Build II contract negotiations for basic construction costs. The Build II preliminary negotiations accounts for anticipated cost growth based on current vendor proposals, current shipbuilder performance, and inflation. The Program completed an updated cost estimate and is supporting the CAPE Independent Cost Estimate (ICE) to support Build II contract negotiation and award. The IEP funding leverages Congressional authorities and is aligned to OSW and Navy direction to execute COLUMBIA Class schedules needed to accelerate ship delivery schedules to reduce the strategic deterrence coverage gaps during transition from OHIO SSBNs to CLB SSBNs and the transition from D5LE to D5LE2 missiles. It is crucial to maintain force structure necessary to meet USSTRATCOM requirements for Sea-Based Strategic Deterrence (SBSD). Total MIB funding of $788M in FY2027 is accounted for in SSBN 837 Plans Costs P-5c Cost Category to ensure it is visible and can be appropriately tracked and managed. FY2021 was the year of authorization for the lead ship, DISTRICT OF COLUMBIA (SSBN 826), and was a new start program due to FY2021 being the first year of incremental full funding. FY2022 and FY2023 were the second and third year of full funding for lead ship, DISTRICT OF COLUMBIA. FY2024 was the year of authorization for the second ship, WISCONSIN (SSBN 827), and first year of incremental funding for the second ship; FY2025 was the second year of incremental funding. FY2026 was the year of authorization and the first year of incremental funding for the third ship, GROTON (SSBN 828). FY2027 is the year of full funding for the fourth ship, SSBN 829. The budget request supports continued detailed design and construction of CFE and GFE systems to build, test, outfit, and deliver SSBN 826 and SSBN 827. Funding also supports Continuous Production of Missile Tubes, Advance Construction (AC), EOQ for Multi-Program Procurement, Continuous Production of Shipyard Manufactured Items, and Supplier Development to reduce COLUMBIA Class construction schedule risk executed in accordance with enhanced acquisition authorities contained within the National Sea-Based Deterrence Fund (NSBDF), 10 U.S.C. 2218a. The Navy executed a Build I contract for the first two COLUMBIA class submarines (SSBN 826 and SSBN 827), detailed below. A Contract Modification for ongoing design/advance construction efforts was awarded on 22 June 2020, which also included the Build I Option for the First Two Ships. This was a Pre-Priced Option for the two ships, SSBN 826 and SSBN 827, and associated design/support efforts. This was a modification of the current IPPD contract (N00024-17-C-2117) and is in line with the program's approved Acquisition Strategy. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 2 of 25 P-1 Line #1 Volume 1 - 2 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 01: Fleet Ballistic Missile Ships / BSA 1: Fleet Ballistic Missile Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Program Elements for Code B Items: N/A Other Related Program Elements: 0603595N, 0603570N Line Item MDAP/MAIS Code: 444 The program received authorization for SSBN 826 in FY2021, funded with three years of incremental funding in FY2021-2023, and SSBN 827 was authorized in FY2024, funded with two years of incremental funding in FY2024-2025. In December 2022, program awarded an additional pre-priced contract modification of IPPD to support Build II/III Advance Procurement / Advance Construction, EOQ for Build II, and MIB efforts. CLB and VIRGINIA Class (VCS) Programs are executing an innovative contracting approach (similar to CLB Build I) which will coordinate CLB Build II with VCS new construction contracting efforts (Block VI (FY2025-2029)) to maximize efficiency and stability across the industrial base. The coordination of contract actions eliminates redundant effort by negotiating multiple contracts simultaneously while allowing the shipbuilders to place material orders for multiple ships in concert with VCS which improves stability for supplier base to de-risk schedules. Since the FY2026 submission, the COLUMBIA Class Program continues investment in initiatives to reduce construction schedule risk and enable cost savings (Multi-Program Material Procurement (MPMP), Continuous Production (CP) of Missile Tubes/Outfitting, Ordnance Systems and Shipyard Manufactured Components, Economic Order Quantity efforts, and Advance Construction). Increased investment in Strategic Weapons System (SWS) Shipboard Systems EOQ and Continuous Production leverages additional opportunities to mitigate obsolescence and construction schedule risks and realize additional cost savings outside of the FYDP. The Navy in FY2027 continues to fund additional IEP initiatives (CP, Missile Tube Outfitting, AC/AP, and Production Backup Units) which is crucial to de-risk and execute IEP Objective schedules. Total class cost savings is $2,010M. Details are contained in the P-10. The first Missile Tube Module (MTM) is funded through RDTEN Program Element 0603595N for $584M; additional $195M funds in the FY2026 submission and $20M in the 2027 submission added due to MTM performance growth. Characteristics: Length Overall Beam Displacement Draft SSBN 560 ft 43 ft 20,800 TONS 36.9 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date SSBN 826 Oct 2020 101 months 101 months Mar 2029 Mar 2029 Aug 2030 (1) SSBN 827 (2) Oct 2020 114 months 79 months Apr 2030 Apr 2030 Jun 2032 SSBN 828 (3) May 2026 SSBN 829 (4) May 2026 63 months 76 months Aug 2031 Aug 2031 Sep 2033 76 months 75 months Sep 2032 Sep 2032 Oct 2034 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 3 of 25 P-1 Line #1 Volume 1 - 3 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 01: Fleet Ballistic Missile Ships / BSA 1: Fleet Ballistic Missile Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Program Elements for Code B Items: N/A Other Related Program Elements: 0603595N, 0603570N Line Item MDAP/MAIS Code: 444 Footnotes: (1) A Contract Modification for ongoing design/advance construction efforts was awarded on Jun 22, 2020, which included the Build I Option for the First Two Ships. This was a Pre-Priced Option for Build I (SSBN 826 and SSBN 827). The start of construction dates reflect when Electric Boat starts full construction on each ship. The Lead Ship was authorized to start construction in Oct 2020 and Navy exercised the option for Build I in November 2020. SSBN 826 has consumed all margin to 84-month contract schedule (October 2027), and Shipbuilders are not performing at rates required to regain schedule. Current performance projects lead ship delivery to be 12-18 months late (Oct-28 to Mar-29) to contract dates. Navy and Shipbuilders executing plan to improve delivery schedule and recover delays to deliver in 2028. The Program does not intend to change the contract delivery date or rebaseline the shipbuilder's schedules beyond contract delivery spans. (2) (3) SSBN 827 full construction commenced in Oct 2023. Start of construction date refers to full construction start date. Construction for SSBN828 started in April 2025. Construction is scheduled to start for SSBN829 in June 2026, for SSBN830 in June 2027, for SSBN831 in June 2028, for SSBN832 in June 2029, and SSBN833 in June 2030. The early construction start dates are enabled by Integrated Enterprise Plan (IEP) funding initiatives and NSBDF authorities. (4) Delivery dates for SSBN 827-SSBN 832 reflect IEP objective dates. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 4 of 25 P-1 Line #1 Volume 1 - 4 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 (†) FY 2021 Cost Categories indicates the presence of a P-8a Plan Costs Change Orders (†) Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance (†) (†) Other Cost Total Ship Estimate FY 2024 Total Cost (Each) Qty ($ M) 1 Basic Construction/Conversion Electronics Qty (Each) 6,946.282 FY 2026 Total Cost Qty ($ M) 1 (Each) 1,443.300 FY 2027 Total Cost Qty ($ M) 1 Total Cost (Each) 1,095.773 ($ M) 1 861.527 5,979.402 6,356.087 7,159.768 6,853.733 238.476 143.242 217.392 207.129 358.293 349.701 361.283 367.634 1,700.900 1,613.999 1,294.878 1,541.973 156.299 119.107 102.496 101.710 668.502 596.757 468.840 512.585 73.446 66.618 43.887 40.078 16,121.600 10,688.811 10,744.317 10,486.369 Less Advance Procurement FY 2026 - - Less Subsequent Full Funding FY 2027 - - 3,329.047 850.012 - Less Cost to Complete FY 2027 566.542 19.386 - - Less Cost to Complete FY 2028 376.000 716.396 - - Less Cost to Complete FY 2029 - 377.039 - - Less Cost to Complete FY 2030 - 269.313 - - Less AP Transfer to NSBDF FY 2017 773.138 - - - Less AP Transfer to NSBDF FY 2018 802.288 59.537 - - Less AP Transfer to NSBDF FY 2019 3,016.029 139.101 0.770 - Less AP Transfer to NSBDF FY 2020 1,636.356 148.450 19.955 0.478 Less AP Transfer to NSBDF FY 2021 - 1,110.652 93.034 0.140 Less AP Transfer to NSBDF FY 2022 - 1,271.428 149.899 77.973 Less AP Transfer to NSBDF FY 2023 - 769.075 1,090.054 176.530 Less AP Transfer to NSBDF FY 2024 - - 949.654 1,299.280 - - 1,183.076 1,177.171 Less AP Transfer to NSBDF FY 2025 Less Full Funding Transfer to NSBDF FY 2021 2,869.024 - - - Less Full Funding Transfer to NSBDF FY 2022 3,003.000 - - - Less Full Funding Transfer to NSBDF FY 2023 3,079.223 - - - Less Full Funding Transfer to NSBDF FY 2024 - 2,443.599 - Less Full Funding Transfer to NSBDF FY 2025 - 3,364.835 - Net P-1 Funding - - 3,928.828 6,904.785 Remarks: (1) FY21 and FY24 hulls' P-5 updates from the FY2026 submission reflect Cost-to-Complete in FY2027-2030 and actuals based on execution. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 5 of 25 P-1 Line #1 Volume 1 - 5 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine (2) SSBN 827 includes $95M of the $130M Congressional Add for Maritime industrial base expansion in FY2021 in Plans and Basic Construction. It also includes $20M of the FY2022 $130M Congressional Add for supplier development in Basic Construction. FY2025 Plans includes supplier development Congressional adds +$5M for explosion welding facilities industrial base and +$18.5M for tube/propulsor facilitization. (3) FY26 and out funds the COLUMBIA Class Program to the NAVSEA 05C's 2024 cost estimate. Increases in Plans driven by Lead Yard Services cost increase and in Basic is driven by performance based on SSBN 826, 827 in addition to labor rate increases and material inflation impacts. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 6 of 25 P-1 Line #1 Volume 1 - 6 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date SSBN 826 (1) General Dynamics Electric Boat 2021 Oct 2020 Oct 2020 Mar 2029 SSBN 827 (2) General Dynamics Electric Boat 2024 Oct 2020 Sep 2023 Apr 2030 SSBN 828 (3) General Dynamics Electric Boat 2026 May 2026 Apr 2025 Aug 2031 SSBN 829 (4) General Dynamics Electric Boat 2027 May 2026 Jun 2026 Sep 2032 SSBN 830 (5) General Dynamics Electric Boat 2028 May 2026 Jun 2027 Aug 2033 SSBN 831 General Dynamics Electric Boat 2029 May 2026 Jun 2028 Jul 2034 SSBN 832 General Dynamics Electric Boat 2030 May 2026 Jun 2029 Jun 2035 SSBN 833 General Dynamics Electric Boat 2031 Nov 2030 Jun 2030 May 2036 Footnotes: (1) A Contract Modification for ongoing design/advance construction efforts was awarded on Jun 22, 2020, which included the Build I Option for the First Two Ships. This was a Pre-Priced Option for Build I (SSBN 826 and SSBN 827). The start of construction dates reflect when Electric Boat starts full construction on each ship. The Lead Ship was authorized to start construction in Oct 2020 and Navy exercised the option for Build I in November 2020. SSBN 826 has consumed all margin to 84-month contract schedule (October 2027), and Shipbuilders are not performing at rates required to regain schedule. Current performance projects lead ship delivery to be 12-18 months late (Oct-28 to Mar-29) to contract dates. Navy and Shipbuilders executing plan to improve delivery schedule and recover delays to deliver in 2028. The Program does not intend to change the contract delivery date or rebaseline the shipbuilder's schedules beyond contract delivery spans. (2) (3) SSBN 827 full construction commenced in Oct 2023. Start of construction date refers to full construction start date. Construction for SSBN828 started in April 2025. Construction is scheduled to start for SSBN829 in June 2026, for SSBN830 in June 2027, for SSBN831 in June 2028, for SSBN832 in June 2029, and SSBN833 in June 2030. The early construction start dates are enabled by Integrated Enterprise Plan (IEP) funding initiatives and NSBDF authorities. (4) (5) Delivery dates for SSBN 827-SSBN 832 reflect IEP objective dates. OWLD dates for SSBN 826-833 reflect DASO start dates with an additional seven months to account for DASO duration, certification, and final reporting. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 7 of 25 P-1 Line #1 Volume 1 - 7 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2024 Electronics Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Sonar 1 96.649 1 103.540 1 105.360 Combat Control 1 16.346 1 19.305 1 19.644 CANES 1 15.642 1 16.270 1 16.556 Electronic Warfare 1 21.677 1 22.550 1 22.946 Photonics 1 24.149 1 25.125 1 25.567 Universal Modular Masts (UMM) 1 7.814 1 8.130 1 8.273 Exterior Communications 1 41.702 1 43.390 1 44.153 P-35 Items Subtotal 223.979 238.310 242.499 Major Items System Level Activities 1 43.803 1 37.493 1 38.152 RADAR 1 1.858 1 1.930 1 1.964 Navigation 1 2.081 1 2.600 1 2.646 CWITT 1 23.851 1 27.810 1 28.299 Non-Propulsion Electronics System, Systems Engineering and Integration (NPES SE&I) 1 31.400 1 28.900 1 29.408 BRR-6 System 1 14.922 1 18.500 1 18.825 BST-1 System 1 4.123 1 5.290 1 5.383 External Countermeasures, IFF 1 3.684 1 0.450 1 0.458 Major Items Subtotal 125.722 122.973 125.135 Total Electronics 349.701 361.283 367.634 Remarks: FY26 and FY27 P-35 and Major Item changes beyond or below FY24 escalation stem from the combination of higher fidelity ship 3 NPES cost estimates, new sub-tier component contract pricing, or reassignment of tactical functionality within NPES (i.e. External Countermeasure launch and control function transferred to Combat Control system launch control for SSBN 828 AFS). System Level Activity reduction and NPES SE&I reduction of 3.5 and 1.5 FTEs per year applied, respectively, through ship deliveries as an offset to shipset material end cost increases. CWITT labor increase reflects higher fidelity cost estimate for scope of NPES/SWS interface testing. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 8 of 25 P-1 Line #1 Volume 1 - 8 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2024 Hull, Mechanical, and Electrical (HM&E) Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Propulsor 1 88.242 1 79.416 1 Advanced Carbon Dioxide Removal Unit (ACRU) 1 8.748 0 - 0 P-35 Items Subtotal 78.133 - 96.990 79.416 78.133 HM&E Installation and testing 12.682 13.235 13.520 T&E 8.033 8.374 8.550 SUPSHIP responsible material 1.402 1.471 1.507 - - - Other Cost Elements Subtotal 22.117 23.080 23.577 Total Hull, Mechanical, and Electrical (HM&E) 119.107 102.496 101.710 Other Cost Elements Naval Foundry Propeller Center (NFPC) LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 9 of 25 P-1 Line #1 Volume 1 - 9 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2024 Ordnance Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Strategic Weapons System (SWS) Launcher 1 289.404 1 226.492 1 230.273 SWS Fire Control 1 129.156 1 105.112 1 165.276 SWS Navigation 1 49.961 1 37.443 1 P-35 Items Subtotal 38.319 468.521 369.047 433.868 55.658 Major Items SWS System Level Activities 78.881 64.948 SWS Reentry Subsystem - - - SWS Guidance Subsystem 2.091 1.331 1.467 SWS Missile Integration Activities 45.422 31.573 20.569 SWS Test Instrumentation Subsystem 1.842 1.941 1.023 Major Items Subtotal 128.236 99.793 78.717 Total Ordnance 596.757 468.840 512.585 Remarks: (1) This line does not fund any efforts related to the development and procurement of the TRIDENT II D5 Life Extension (D5LE) Missile or TRIDENT II D5 Life Extension 2 (D5LE2) Missile (however, CLB SWS is dependent on these efforts to ensure the system maintains demonstrated performance and remains survivable while facing a dynamic threat environment until COLUMBIA end of life.) (2) FY2027/SSBN829 includes procurement and installation of the SWS Fire Control Subsystem equipment suite for the COLUMBIA Class Targeting Engineering Test System (TETS). The TETS is the shore based installation of the tactical Fire Control System (FCS) maintained onboard a government facility that is used to develop and qualify the targeting and mission planning software for the Strategic Weapon System (SWS), as well as support problem resolution and investigation of trouble reports received from the fleet. The TETS is required to support COLUMBIA Class Demonstration and Shakedown Availability (DASO) test events. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 10 of 25 P-1 Line #1 Volume 1 - 10 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Sonar PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 61.855 FY 2027 Total Cost Qty ($ M) 1 66.266 Technical Engineering Services 17.880 19.154 Other Costs 16.914 18.120 Total 1 96.649 1 Total Cost (Each) ($ M) 1 67.430 19.492 18.438 103.540 1 105.360 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. The Sonar P-35 item contains acoustic sensors and processing electronics required to detect, classify, track and localize surface and submerged contacts. This includes Large Aperture Bow (LAB) array hydrophones, outboard electronics bottles, the Low Cost Conformal Array (LCCA), the AN/WSQ-9 signal analysis system, acoustic intercept and miscellaneous single purpose function sensors, total ship monitoring system (TSMS), two (2) tactical towed arrays, high frequency sail array, and inboard signal conditioning and display electronics capacity to support both GFE sensors and the CFE Large Vertical Array (LVA). The SONAR P-35 includes engineering services required to produce the sonar logistics products, perform equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering, integration, and testing. Other costs include software, initial spares, ship systems data, and SONAR program management labor. Contract Data: Quantity Unit Cost Option 1 61.855 May 2025 Option 1 66.266 Aug 2026 Option 1 67.430 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various C/CPIF Feb 2022 FY 2026 SSBN 828 Various C/CPIF FY 2027 SSBN 829 Various C/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 FY 2026 FY 2027 Required Award Date SSBN 827 Apr 2030 42 33 Feb 2022 SSBN 828 Aug 2031 42 33 May 2025 SSBN 829 Sep 2032 41 33 Aug 2026 Competition/Second Source Initiatives: N/A Remarks: The SONAR P-35 exhibit includes funding for multiple subsystem contracts, field activities, and support efforts, not just system hardware. Equipment is needed to meet contractual obligations to the shipbuilder in support of the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. Above does not contain award and delivery dates for every component, including those required earlier than the COATS period. The unit cost in the contract data section only reflects the major prime contractor HW/SW procurement and system integration cost, specifically Lockheed Martin: A-RCI, TSMS, AI&R, LWLCCA (CPIF), NSMA: WSQ-9 (FPI), and L-3: TB-34, TB-29 (CPIF). LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 11 of 25 P-1 Line #1 Volume 1 - 11 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Combat Control PARM Code: N/A FY 2024 P-35 Category Qty (Each) Major Hardware FY 2026 Total Cost Qty ($ M) 1 (Each) 5.149 FY 2027 Total Cost Qty ($ M) 1 6.081 Technical Engineering Services 3.678 4.344 Other Costs 7.519 8.880 Total 1 16.346 1 Total Cost (Each) ($ M) 1 6.188 4.420 9.036 19.305 1 19.644 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. The Combat Control P-35 item contains processing electronics and attack center controls and displays required to support launch of non-strategic defensive weapons and fuse all contact data with own-ship navigational positioning. The hardware suite contains combat control processing and display electronics, and electronics specific to cyber security protection and monitoring of the entire NPES. The Combat Control P-35 includes engineering services required to produce the logistics products, perform equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering, integration, and system testing. Other costs include the extensive suite of individually procured software applications (Tactical Control, Weapons Control, Common Infrastructure Services, Voyage Management System, Information Assurance, On-Board Team Trainer Master Controller, Integrated System Maintenance Tool), initial spares, ship systems data, and Combat Control program management labor. Contract Data: Quantity Unit Cost Option 1 5.149 May 2025 Option 1 6.081 Aug 2026 Option 1 6.188 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Leonardo Diagnostic/Retrieval Systems (DRS) C/CPIF Jan 2024 FY 2026 SSBN 828 Leonardo Diagnostic/Retrieval Systems (DRS) C/CPIF FY 2027 SSBN 829 Leonardo Diagnostic/Retrieval Systems (DRS) C/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 FY 2026 FY 2027 Required Award Date SSBN 827 Apr 2030 42 33 Jan 2024 SSBN 828 Aug 2031 42 33 May 2025 SSBN 829 Sep 2032 41 33 Aug 2026 Competition/Second Source Initiatives: N/A Remarks: The Combat Control P-35 exhibit includes funding for the H/W suite, multiple software contracts, field activities, and support efforts, not just system hardware. The single award date shown represents when the placement for preponderance of equipment is needed to meet contractual obligations to the shipbuilder in support of the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. Above does not contain award and delivery dates for every component, including those required earlier than the COATS period. The unit cost in the contract data section only reflects the H/W prime contractor cost. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 12 of 25 P-1 Line #1 Volume 1 - 12 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: CANES PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 4.302 FY 2027 Total Cost Qty ($ M) 1 4.962 Technical Data and Documentation 4.614 4.393 Other Costs 6.726 6.915 Total 1 15.642 1 Total Cost (Each) ($ M) 1 5.050 4.470 7.036 16.270 1 16.556 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. This P-35 covers the procurement requirements for the Consolidated Afloat Networks and Enterprise Services (CANES) crew information technology hardware suite and the non-tactical data processing system (NTDPS) software. The hardware suite contains CANES processing and display electronics and peripherals (laptops, printers, data storage), and the software suite is inclusive of the NTDPS applications. The CANES P-35 includes engineering services required to produce the logistics products, perform equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering, integration, and system testing. Other costs include the suite of individually procured NTDPS software applications, initial spares, ship systems data, and CANES program management labor. Contract Data: Quantity Unit Cost Option 1 4.302 Aug 2025 Option 1 4.962 Oct 2026 Option 1 5.050 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 NEIS Various Apr 2024 FY 2026 SSBN 828 NEIS Various FY 2027 SSBN 829 NEIS Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 SSBN 827 Apr 2030 42 30 Required Award Date Apr 2024 FY 2026 SSBN 828 Aug 2031 42 30 Aug 2025 FY 2027 SSBN 829 Sep 2032 41 30 Oct 2026 Competition/Second Source Initiatives: N/A Remarks: The CANES P-35 exhibit includes funding for the H/W suite, software contracts, field activities, and support efforts in addition to system hardware. The required award date shown represents contract award to support the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. There are subsequent contract awards for the rest of the equipment to support the construction schedule. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 13 of 25 P-1 Line #1 Volume 1 - 13 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Electronic Warfare PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 11.922 FY 2027 Total Cost Qty ($ M) 1 12.403 Technical Engineering Services 5.311 5.524 Other Costs 4.444 4.623 Total 1 21.677 1 Total Cost (Each) ($ M) 1 12.620 5.622 4.704 22.550 1 22.946 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the non-strategic warfighting, navigation, communications, and crew information technology functions. The EW P-35 item contains the processing electronics and software required to detect surface borne electromagnetic energy and classify threat emissions spanning a variety of signal types and frequency range. This includes the AN/BLQ-10 signal processing, display and control system and TYPE 20/24 antenna below deck processing electronics. The EW P-35 includes engineering services required to produce the EW logistics products, perform equipment installation, provide construction window field support/ troubleshooting/repair, and support platform compatibility engineering, integration, and system testing. Other costs include software, initial spares, ship systems data, and EW program management labor. Contract Data: Quantity Unit Cost Option 1 11.922 May 2025 Option 1 12.403 Aug 2026 Option 1 12.621 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 LM RMS Various Jan 2024 FY 2026 SSBN 828 LM RMS Various FY 2027 SSBN 829 LM RMS Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 SSBN 827 Apr 2030 42 33 Required Award Date Jan 2024 FY 2026 SSBN 828 Aug 2031 42 33 May 2025 FY 2027 SSBN 829 Sep 2032 41 33 Aug 2026 Competition/Second Source Initiatives: N/A Remarks: The EW P-35 exhibit includes total funding for the contracts, field activities, and support efforts in addition to system hardware. The required award date shown represents initial contract award to support the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. There are subsequent contract awards for the rest of the equipment to support the construction schedule. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 14 of 25 P-1 Line #1 Volume 1 - 14 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Photonics PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 16.421 FY 2027 Total Cost Qty ($ M) 1 17.085 Technical Engineering Services 3.623 3.769 Other Costs 4.105 4.271 Total 1 24.149 1 Total Cost (Each) ($ M) 1 17.386 3.835 4.346 25.125 1 25.567 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. The Photonics P-35 item contains the two (2) imaging masts, inboard processing electronics and software required to support surface and submerged periscope operations, and includes visual and infrared (IR) imaging, RF signal communications, and radar early warning. The Photonics P-35 includes engineering services required to produce the logistics products, perform equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering and integration. Other costs include software, initial spares, ship systems data, and Photonics program management labor. Contract Data: Quantity Unit Cost Option 1 16.421 Aug 2025 Option 1 17.085 Oct 2026 Option 1 17.385 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 LM RMS C/CPIF Apr 2024 FY 2026 SSBN 828 LM RMS C/CPIF FY 2027 SSBN 829 LM RMS C/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 SSBN 827 Apr 2030 42 30 Required Award Date Apr 2024 FY 2026 SSBN 828 Aug 2031 42 30 Aug 2025 FY 2027 SSBN 829 Sep 2032 41 30 Oct 2026 Competition/Second Source Initiatives: N/A Remarks: The Photonics P-35 exhibit includes funding for multiple contracts, field activities, and support efforts, not just system hardware. The unit cost in the contract data section only reflects the qty 2 masts, prime contractor HW/SW procurement, and system integration cost. The contracts are with LM (CPIF Option) and L3-KEO (CPIF Option). The required award date shown represents initial contract award to support the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. There are subsequent contract awards for the rest of the equipment to support the construction schedule. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 15 of 25 P-1 Line #1 Volume 1 - 15 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Universal Modular Masts (UMM) PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 5.587 FY 2027 Total Cost Qty ($ M) 1 5.813 Technical Engineering Services 1.641 1.707 Other Costs 0.586 0.610 Total 1 7.814 1 Total Cost (Each) ($ M) 1 5.915 1.737 0.621 8.130 1 8.273 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. The UMM P-35 item contains the hardware costs for six (6) telescopic mechanical mast assemblies custom sized for Columbia Class Sail installation and required to raise and lower the Photonics and Exterior Communications mast heads. The UMM P-35 includes engineering services required to produce the logistics products, perform equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering and integration. Other costs include initial spares, ship systems data, and UMM program management labor. Contract Data: Quantity Unit Cost Option 1 5.587 Nov 2024 Option 1 5.813 Dec 2025 Option 1 5.915 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 L3-KEO SS/FFP May 2023 FY 2026 SSBN 828 L3-KEO SS/FFP FY 2027 SSBN 829 L3-KEO SS/FFP (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2024 SSBN 827 Apr 2030 55 28 May 2023 FY 2026 SSBN 828 Aug 2031 55 26 Nov 2024 FY 2027 SSBN 829 Sep 2032 56 26 Dec 2025 Competition/Second Source Initiatives: N/A Remarks: The UMM P-35 exhibit includes funding for the prime contract, services contract, field activities. The required award date shown represents contract award to support the sail construction milestone. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 16 of 25 P-1 Line #1 Volume 1 - 16 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Exterior Communications PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 26.064 FY 2027 Total Cost Qty ($ M) 1 27.119 Technical Engineering Services 8.132 8.461 Other Costs 7.506 7.810 Total 1 41.702 1 Total Cost (Each) ($ M) 1 27.596 8.610 7.947 43.390 1 44.153 Description: The COLUMBIA ELECTRONICS budget funds procurement of the Non-Propulsion Electronics System (NPES), which is the collection of command and control subsystems required to provide all of the nonstrategic warfighting, navigation, communications, and crew information technology functions. The Exterior Communications Systems (ECS) provides the secure off-hull connectivity vital to ship operation and mission success. The ECS P-35 item contains two (2) multi-function antennas, one (1) high data rate antenna, two (2) floating wire antennas, below deck digital modular radios, cryptology, routers, and operator display and control electronics. The ECS P-35 includes engineering services required to produce the ECS logistics products, perform equipment installation, provide construction window field support/ troubleshooting/repair, and support platform compatibility engineering and integration. Other costs include software, initial spares, ship systems data, and ECS program management labor. Contract Data: Quantity Unit Cost Option 1 26.064 Various Option 1 27.119 Various Option 1 27.595 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various Various Various FY 2026 SSBN 828 Various Various FY 2027 SSBN 829 Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2024 SSBN 827 Apr 2030 97 Production Leadtime Required Award Date Various FY 2026 SSBN 828 Aug 2031 42 Various FY 2027 SSBN 829 Sep 2032 41 Various Competition/Second Source Initiatives: N/A Remarks: The ECS P-35 exhibit includes funding for multiple subsystems, contracts, field activities, and support efforts, not just system hardware. The preponderance of components are submarine fleet common and procured as Government-Off-The-Shelf (GOTS) components using existing PEO C4I contracts to support the Command and Control System Module (CCSM) Off-hull Assembly and Test Site (COATS) milestone in construction. SSBN 827 reflects various contract awards; however, months required before delivery represents initial contract award made using FY2020 Multi-Program Material Procurement AP to consolidate ECS mast procurements with VIRGINIA Class bulk procurement. There are subsequent contract awards for the rest of the equipment to support the construction schedule. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 17 of 25 P-1 Line #1 Volume 1 - 17 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Propulsor PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 Technical Engineering Services (Each) 78.186 FY 2027 Total Cost Qty ($ M) 1 1 ($ M) 71.372 10.056 Total Total Cost (Each) 1 69.929 1 78.133 8.044 88.242 1 8.204 79.416 Description: The propulsor consists of Ni-Al-bronze components and assemblies, a Monel bearing support structure, other engineered components and supporting items for corrosion protection, noise monitoring, etc. The purpose of the propulsor is to generate proper thrust to propel the ship at a rated speed within the approved limits of torque and shaft RPM, while at the same time meeting acoustic and structural requirements. This design is unique to the COLUMBIA Class. The propulsor consists of a large quantity of government supplied material and contracts for specific engineered components. Contract Data: Quantity Unit Cost Various 1 78.187 Jan 2023 Various 1 71.372 Feb 2024 Option 1 69.929 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various Various Nov 2021 FY 2026 SSBN 828 Various Various FY 2027 SSBN 829 Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2024 SSBN 827 Apr 2030 53 48 Nov 2021 FY 2026 SSBN 828 Aug 2031 48 56 Jan 2023 FY 2027 SSBN 829 Sep 2032 48 57 Feb 2024 Competition/Second Source Initiatives: Naval Surface Warfare Center Carderock Division (NSWCCD) has awarded a mix of sole-source and competitive contracts for engineered propulsor components for COLUMBIA Class. Remarks: Naval Surface Warfare Center Carderock Division (NSWCCD) has awarded new contracts or delivery orders on existing contracts for Bearing Support Structure, Ropeguard, Tailcone, Devices and Hydrodynamic Shaping Material (HYSHMA) to support deliveries for each COLUMBIA Class hull. SSBN 827 contract actions occurred in FY2022-2023 to support the Navy's delivery of GFE propulsor components to Electric Boat in FY2025-2026. SSBN 828 contract actions occurred in FY2023-2024 to support the Navy's delivery of GFE propulsor components to Electric Boat in FY2027-2028. SSBN 829 contract actions occurred in FY2024-2026 to support the Navy's delivery of GFE propulsor components to Electric Boat in FY2028-2029. Major propulsor components for SSBN 826 have been delivered to the shipbuilder. Months required before delivery and production lead time reflect Bearing Support Structure, the GFE propulsor component with the earliest delivery to Electric Boat. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 18 of 25 P-1 Line #1 Volume 1 - 18 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Advanced Carbon Dioxide Removal Unit (ACRU) PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 7.483 FY 2027 Total Cost Qty ($ M) 0 - Technical Engineering Services 0.309 - Other Costs 0.956 - Total 1 8.748 0 Total Cost (Each) ($ M) 0 - - 0 - Description: The Advanced Carbon Dioxide (CO2) Removal Unit (ACRU) takes the place of legacy CO2 removal equipment used on previous classes and will be the system for COLUMBIA Class Submarines. The ACRU uses a solid sorbent material vice the hazardous liquid amine used in existing CO2 scrubbers. The ACRU is Government Furnished Equipment (GFE) for the first two hulls and will be procured to support contractor integration schedules and required in year need dates. The solid sorbent material will be procured separately from the ACRUs. On-board spares, drawing updates, program management and Government technical and contractual oversight are not included in this cost. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various Various Sep 2020 Option Quantity Unit Cost 1 7.483 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2024 SSBN 827 Apr 2030 81 34 Sep 2020 Competition/Second Source Initiatives: Production Contract for ACRU Units was a competitive award. Remarks: NSWC Philadelphia is executing contract efforts for lead ship and second ship ACRU procurement, Hull 3 and follow ships are funded as part of the basic construction contract by the shipbuilder. Values include support through delivery. Hull 1 shipset has been delivered to the shipbuilder in support of construction. Ship 2 shipset delivered in place Q1 FY2026. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 19 of 25 P-1 Line #1 Volume 1 - 19 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: Strategic Weapons System (SWS) Launcher PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 Technical Engineering Services (Each) 223.582 FY 2027 Total Cost Qty ($ M) 1 193.789 65.822 Total 1 Total Cost (Each) ($ M) 1 194.402 1 230.273 32.703 289.404 1 35.871 226.492 Description: The COLUMBIA Strategic Weapon System (SWS) will consist of multiple subsystems comprised of tactical and non-tactical subsystems which work as a single unit to prepare, launch, and deliver the warheads to their predetermined targets. The SWS Launcher Subsystem includes the equipment necessary to store and launch the TRIDENT II (D5) Missile when the submarine is submerged or surfaced. This SWS Launcher Subsystem consists of a Launch Tube Group, Missile Handling Equipment, a Vertical Support Group, an Umbilical Retractor Group, a Closure Group, a Missile Ejector Group, and security locks. The SWS Launcher P-35 includes program management and engineering services required to produce the logistics products, support equipment installation, provide construction window field support/troubleshooting/ repair, and support platform compatibility engineering, integration, and system testing. Contract Data: Quantity Unit Cost New 1 223.582 Jun 2022 Various 1 193.789 Dec 2025 Various 1 194.402 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various Various Jun 2022 FY 2026 SSBN 828 Various Various FY 2027 SSBN 829 Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2024 SSBN 827 Apr 2030 48 48 Jun 2022 FY 2026 SSBN 828 Aug 2031 64 Various FY 2027 SSBN 829 Sep 2032 58 Various Competition/Second Source Initiatives: N/A Remarks: SSBN 827: Northrop Grumman System Corporation - Marine Systems was awarded a contract in December 2025 to procure the preponderance of Launcher Subsystem components for SSBN 827. An FY2022 mod to the FY2019 production contract procured the Umbilical Housings required for SSBN 827. There are subsequent contract awards for the remainder of the equipment and technical engineering services required to support the ship construction. Naval Surface Warfare Center Crane Division awarded separate contracts for associated support equipment in FY2024-2025 to support deliveries to SSBN 827. The unit cost in the contract data section reflects the aggregate hardware procurement and system integration cost. SSBN 828: Northrop Grumman System Corporation - Marine Systems was awarded a contract in June 2022 to procure the preponderance of Launcher Subsystem components for SSBN 828. A FY2022 mod to the FY19 production contract procured the Umbilical Housings required for SSBN 828. There are subsequent contract awards for the remainder of the equipment and technical engineering services required to support the ship construction. Naval Surface Warfare Center Crane Division will award separate contracts for associated support equipment in FY2026-2027 to support deliveries to SSBN 828. The unit cost LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 20 of 25 P-1 Line #1 Volume 1 - 20 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Equipment Item: Strategic Weapons System (SWS) Launcher PARM Code: N/A in the contract data section reflects the aggregate hardware procurement and system integration cost. SSBN 828 reflects various contract awards; however, months required before delivery represents initial FY2022 contract award for Launcher Subsystem procurements using continuous production AP and LLTM funding. SSBN 829: Northrop Grumman System Corporation - Marine Systems awarded a contract in December 2025 to procure the preponderance of Launcher Subsystem components for SSBN 829. An FY2022 mod to the FY2019 production contract procured the Umbilical Housings required for SSBN 829. An FY2022 production contract procured the Launch Tubes required for SSBN 829. There are subsequent contract awards for the remainder of the equipment and technical engineering services required to support the ship construction. Naval Surface Warfare Center Crane Division will award separate contracts for associated support equipment in FY2028-FY2029 to support deliveries to SSBN 829. The unit cost in the contract data section reflects the aggregate hardware procurement and system integration cost. SSBN 829 reflects various contract awards; however, months required before delivery represents initial FY25 contract award for Launcher Subsystem procurements using continuous production AP and LLTM funding. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 21 of 25 P-1 Line #1 Volume 1 - 21 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: SWS Fire Control PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 Technical Engineering Services Other Costs Total 1 (Each) 71.295 FY 2027 Total Cost Qty ($ M) 1 72.108 57.861 33.004 - - 129.156 1 Total Cost (Each) ($ M) 1 76.124 36.063 53.089 105.112 1 165.276 Description: The COLUMBIA Strategic Weapon System (SWS) will consist of multiple subsystems comprised of tactical and non-tactical subsystems which work as a single system to prepare, launch, and deliver the warheads to their predetermined targets. The SWS Fire Control Subsystem includes equipment necessary to launch the TRIDENT II (D5) Missile; monitor and control the missile environment; provide checkout and fault isolation capabilities; and provide equipment and network infrastructure capable of collecting, recording, processing, on-loading, and off-loading SWS data to support weapon system performance and accuracy evaluation. The SWS Fire Control P-35 includes engineering services required to produce the logistics products, support equipment installation, provide construction window field support/ troubleshooting/repair, and support platform compatibility engineering, integration, and system testing. FY2027/SSBN 829 includes procurement and installation of the SWS Fire Control Subsystem equipment suite for the COLUMBIA Class Targeting Engineering Test System (TETS). The TETS is the shore-based installation of the tactical Fire Control System (FCS) maintained onboard a government facility that is used to develop and qualify the targeting and mission planning software for the Strategic Weapon System (SWS), as well as support problem resolution and investigation of trouble reports received from the fleet. The TETS is required to support COLUMBIA Class Demonstration and Shakedown Availability (DASO) test events. Contract Data: Quantity Unit Cost New 1 71.295 Various Option 1 70.108 Various Option 1 76.124 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various SS/CPIF Various FY 2026 SSBN 828 Various SS/CPIF FY 2027 SSBN 829 Various SS/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2024 SSBN 827 Apr 2030 66 27 Required Award Date Jul 2022 FY 2026 SSBN 828 Aug 2031 68 27 Nov 2023 FY 2027 SSBN 829 Sep 2032 74 32 Jan 2024 Competition/Second Source Initiatives: N/A Remarks: SSBN 827: General Dynamics Missions Systems was awarded a contract in July 2022 to procure the preponderance of Fire Control Subsystem components for SSBN 827 and provide subsystem integration efforts. EOQ production CLIN(s) are included on each production contract to address obsolescence risks. L3Harris was awarded in November 2023 the procurement of the Shipboard Data Subsystem components for SSBN 827 and provide subsystem integration efforts. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 22 of 25 P-1 Line #1 Volume 1 - 22 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Equipment Item: SWS Fire Control PARM Code: N/A SSBN 828: General Dynamics Missions Systems was awarded a contract in July 2022 with an FY2023 option to procure the preponderance of Fire Control Subsystem components for SSBN 828 and provide subsystem integration efforts. EOQ production CLIN(s) are included on each production contract to address obsolescence risks. An L3Harris production contract was awarded in December 2024 for the procurement of the Shipboard Data Subsystem components for SSBN 828 and provide subsystem integration efforts. SSBN 829: General Dynamics Missions Systems was awarded a contract in January 2024 to procure the preponderance of Fire Control Subsystem components for SSBN 829 and provide subsystem integration efforts. Each production contract includes EOQ CLIN(s) to address obsolescence risk. L3Harris is expected to be awarded in October 2026 for the procurement of the Shipboard Data Subsystem components for SSBN 829 and provide subsystem integration efforts. Production lead times updated to reflect actual subvendor delivery timeframes. FY2027 cost increase is due to procurement and installation of the SWS FCS for TETS. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 23 of 25 P-1 Line #1 Volume 1 - 23 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Equipment Item: SWS Navigation PARM Code: N/A FY 2024 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 Technical Engineering Services (Each) 31.266 FY 2027 Total Cost ($ M) 1 1 Total Cost (Each) 25.202 18.695 Total Qty ($ M) 1 24.386 12.241 49.961 1 13.933 37.443 1 38.319 Description: The COLUMBIA Strategic Weapon System (SWS) will consist of multiple subsystems comprised of tactical and non-tactical subsystems which work as a single unit to prepare, launch, and deliver the warheads to their predetermined targets. The SWS Navigation Subsystem includes inertial and non-inertial equipment and Sonar equipment necessary to determine submarine position which is critical in support of SWS accuracy as well as platform tactical navigation requirements. The SWS Navigation P-35 includes engineering services required to produce the logistics products, support equipment installation, provide construction window field support/troubleshooting/repair, and support platform compatibility engineering, integration, and system testing. Contract Data: Quantity Unit Cost Various 1 31.266 Various Various 1 25.202 Various Various 1 24.386 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2024 SSBN 827 Various Various Various FY 2026 SSBN 828 Various Various FY 2027 SSBN 829 Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2024 SSBN 827 Apr 2030 90 Production Leadtime Required Award Date Various FY 2026 SSBN 828 Aug 2031 106 Various FY 2027 SSBN 829 Sep 2032 107 Various Competition/Second Source Initiatives: N/A Remarks: SSBN 827: Non-inertial navigation components, as well as Navigation Subsystem integration efforts, were procured as options to a Lockheed Martin Rotary and Mission Systems contract that was awarded in November 2022. An additional Firm Fixed Priced contract was awarded to Lockheed Martin Rotary and Mission Systems in FY2021 to continually produce inertial navigation components for all SSBN platforms. Navigation Sonar Systems are well into production by NSWC Crane and expect a delivery date in FY2026. Common SWS Cabinet Infrastructure cabinets are provided to Lockheed Martin Rotary and Mission Systems by General Dynamic Mission Systems as required for Non-Inertial component production. Subsequent contract awards for the remainder of the technical engineering services required to support ship construction are planned. Since the FY2025 budget, the Months Required Before Delivery date methodology was updated to reflect when 827 AP funding was obligated in a consolidated procurement of the Inertial Navigation Subsystem components on the FY2021 Firm Fixed Priced contract. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 24 of 25 P-1 Line #1 Volume 1 - 24 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Equipment Item: SWS Navigation PARM Code: N/A SSBN 828: Non-inertial navigation components, as well as Navigation Subsystem integration efforts, will be procured as options to a Lockheed Martin Rotary and Mission Systems contract that was awarded in October 2024. An additional Firm Fixed Priced contract was awarded to Lockheed Martin Rotary and Mission Systems in FY21 to continually produce inertial navigation components for all SSBN platforms. Navigation Sonar Systems will be produced by NSWC Crane in FY27. Common SWS Cabinet Infrastructure cabinets are provided to Lockheed Martin Rotary and Mission Systems by General Dynamic Mission Systems as required for Non-Inertial component production. Subsequent contract awards for the remainder of the technical engineering services required to support ship construction are planned. The Months Required Before Delivery date reflects when 828 AP funding was obligated in a consolidated procurement of the Inertial Navigation Subsystem components on the FY2021 Firm Fixed Priced contract. SSBN 829: Non-inertial navigation components, as well as Navigation Subsystem integration efforts, will be procured as options to a Lockheed Martin Rotary and Mission Systems that was awarded in October 2024. An additional Firm Fixed Priced contract was awarded to Lockheed Martin Rotary and Mission Systems in FY2021 to continually produce inertial navigation components for all SSBN platforms. Navigation Sonar Systems will be produced by NSWC Crane in FY2027. Common SWS Cabinet Infrastructure cabinets are provided to Lockheed Martin Rotary and Mission Systems by General Dynamic Mission Systems as required for non-inertial component production. Subsequent contract awards for the remainder of the technical engineering services required to support ship construction are planned. Subsequent contract awards for the remainder of the technical engineering services required to support ship construction are planned. The Months Required Before Delivery date reflects when 829 AP funding was obligated in a consolidated procurement of the Inertial Navigation Subsystem components on the FY2021 Firm Fixed Priced contract. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 25 of 25 P-1 Line #1 Volume 1 - 25 === page 76 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 26 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 1,637.000 ($ M) FY 2027 ($ M) ($ M) FY 2028 FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) PLANS (1) Supplier Development- Maritime Industrial Base - SSBN 837 (2) 12-60 Various 1,954.000 SSBN 828 12-60 Various 70.000 - 0.000 - - - - SSBN 829 12-60 Various 53.189 51.989 0.000 - - - - SSBN 830 12-60 Various - 3.260 14.914 - - - - SSBN 831 12-60 Various - - 6.765 15.229 - - - SSBN 832 12-60 Various - - 0.000 6.930 15.600 - - SSBN 833 12-60 Various - - 0.000 - 7.136 16.062 - SSBN 834 12-60 Various - - 0.000 - - 7.317 16.470 SSBN 835 12-60 Various - - 0.000 - - - 7.502 SSBN 838 12-60 Various - - 0.000 214.057 - - 809.679 1,018.316 Total: PLANS (1) 2,077.189 1,692.249 788.000 782.100 686.400 709.136 600.800 624.179 607.300 631.272 BASIC CONSTRUCTION (3) - SHIPBUILDER PROCURED LLTM SSBN 827 24-54 Various SSBN 828 24-54 Various 507.737 - 0.000 - - - - - 0.000 - - - - SSBN 829 24-54 Various 121.403 SSBN 830 24-54 Various 193.773 203.000 0.000 - - - - 150.730 377.151 - - - SSBN 831 24-54 Various - - 161.523 371.093 583.931 - - SSBN 832 24-54 Various - - - 167.177 393.980 596.657 - - SSBN 833 24-54 Various SSBN 834 24-54 Various - - 0.000 173.028 415.901 610.322 - - 0.000 - 179.084 500.240 513.294 SSBN 835 24-54 SSBN 836 24-54 Various - - 0.000 - - 185.355 577.254 Various - - 0.000 - - Total: BASIC CONSTRUCTION (3) - SHIPBUILDER PROCURED LLTM - 822.913 515.253 915.421 1,150.939 1,191.642 1,295.917 - 191.840 1,282.388 BASIC CONSTRUCTION (4) - MISSILE TUBE CONTINUOUS PRODUCTION & OUTFITTING SSBN 827 36-42 Various - - 0.000 - - - - SSBN 828 36-42 Various - - 0.000 - - - - SSBN 829 36-42 Various - - 0.000 - - - - SSBN 830 36-42 Various 36.374 0.000 - - - - LI 1045 - COLUMBIA Class Submarine Navy 133.496 UNCLASSIFIED Page 1 of 15 P-1 Line #2 Volume 1 - 27 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) SSBN 831 36-42 Various 63.059 139.961 59.640 - - - - SSBN 832 36-42 Various 19.706 64.024 149.678 54.818 - - - SSBN 833 36-42 Various - 20.931 65.030 156.628 53.043 - - SSBN 834 36-42 Various - - 22.999 65.251 163.816 51.231 - SSBN 835 36-42 Various - - 0.000 24.323 66.309 174.413 46.131 SSBN 836 36-42 Various - - 0.000 - 26.521 66.553 182.148 SSBN 837 36-42 Various - - 0.000 - - 28.070 13.058 SSBN 838 36-42 Various - - 0.000 - - - 29.709 Total: BASIC CONSTRUCTION (4) - MISSILE TUBE CONTINUOUS PRODUCTION & OUTFITTING 216.261 261.290 297.347 301.020 309.689 320.267 271.046 BASIC CONSTRUCTION (5) - ADVANCE CONSTRUCTION SSBN 827 24-42 Various - 0.000 - - - - SSBN 828 24-42 Various 501.264 SSBN 829 24-42 Various 73.909 449.045 - 0.000 - - - - 0.000 - - - SSBN 830 24-42 Various 33.554 - 100.396 460.279 - - - SSBN 831 24-42 Various - - 34.342 127.908 471.449 - - - SSBN 832 24-42 SSBN 833 24-42 Various - - 35.149 130.954 482.877 - - Various - - 0.000 35.975 134.073 494.585 SSBN 834 24-42 Various - - 0.000 - 36.820 137.266 506.576 SSBN 835 24-42 Various - - 0.000 - - 37.685 140.535 SSBN 836 24-42 Various - - 0.000 - - - Total: BASIC CONSTRUCTION (5) - ADVANCE CONSTRUCTION - 608.727 583.783 623.336 638.378 653.770 669.536 - 38.571 685.682 BASIC CONSTRUCTION (6) - EOQ IN SUPPORT OF MULTI-PROGRAM PROCUREMENT SSBN 829 24-42 Various SSBN 830 24-42 Various 103.412 SSBN 831 24-42 Various 111.918 SSBN 832 24-42 Various 102.935 SSBN 833 24-42 Various - - SSBN 834 24-42 Various - - LI 1045 - COLUMBIA Class Submarine Navy - UNCLASSIFIED Page 2 of 15 - 0.000 - - - - - 0.000 - - - - 104.926 0.000 - - - - 104.927 0.000 - - - - 0.000 - - 166.100 0.000 - - 166.100 P-1 Line #2 138.462 Volume 1 - 28 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) SSBN 835 24-42 Various - - 0.000 - - 166.100 138.462 SSBN 836 24-42 Various - - 0.000 - - 166.100 138.462 SSBN 837 - Production Backup Units 24-42 Various 15.455 15.764 SSBN 838 24-42 Various - - 0.000 - - 166.109 136.711 SSBN 839 24-42 Various - - 0.000 - - 166.092 138.439 15.455 1,012.365 690.536 Total: BASIC CONSTRUCTION (6) - EOQ IN SUPPORT OF MULTIPROGRAM PROCUREMENT 171.001 489.266 166.792 376.645 172.483 172.483 174.596 174.596 - BASIC CONSTRUCTION (7) - SHIPYARD MANUFACTURED ITEMS CONTINUOUS PRODUCTION SSBN 827 12-36 Various - - 0.000 - - - - SSBN 828 12-36 Various 15.299 - 0.000 - - - - SSBN 829 12-36 Various 11.660 14.476 0.000 - - - - SSBN 830 12-36 Various 7.531 11.057 10.395 - - - - SSBN 831 12-36 Various 4.683 7.968 9.694 13.665 - - - SSBN 832 12-36 Various 5.420 5.737 6.339 10.797 14.882 - - SSBN 833 12-36 Various 1.111 5.752 5.064 5.769 12.185 9.674 - SSBN 834 12-36 Various 1.616 - 5.096 5.430 5.038 12.616 9.583 SSBN 835 12-36 Various - 1.165 0.000 2.324 8.937 4.175 12.464 SSBN 836 12-36 Various - - 1.031 - 3.562 8.061 4.142 SSBN 837 12-36 Various - - 0.000 0.938 - 4.952 - SSBN 838 12-36 Various - - 0.000 - 0.911 - 4.952 SSBN 839 12-36 Various - - 0.000 - - 0.938 - 47.320 46.155 37.619 38.923 45.515 40.416 31.141 - - 0.000 - - - - - Total: BASIC CONSTRUCTION (7) - SHIPYARD MANUFACTURED ITEMS CONTINUOUS PRODUCTION NUCLEAR PROPULSION PLANT EQUIPMENT (8) SSBN 828 (In Support of AC) 30-72 Various SSBN 829 (In Support of AC) 30-72 Various 791.760 SSBN 830 (In support of AC) 30-72 Various 734.937 SSBN 831 (In Support of AC) 30-72 Various - SSBN 832 (In Support of AC) 30-72 Various - - 729.821 810.146 SSBN 833 (In Support of AC) 30-72 Various - - 0.000 733.970 LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 3 of 15 0.000 - - - - 711.053 0.000 - - - - 729.475 760.323 - - - - - - - - - P-1 Line #2 861.615 Volume 1 - 29 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 FY 2029 ($ M) SSBN 834 (In Support of AC) 30-72 Various - - 0.000 - SSBN 835 30-72 Various - - 0.000 - SSBN 836 30-72 Various Total: NUCLEAR PROPULSION PLANT EQUIPMENT (8) 1,526.697 1,440.528 0.000 1,490.144 FY 2030 ($ M) 1,544.116 FY 2031 ($ M) 740.914 1,602.529 ($ M) 915.816 749.646 1,665.462 971.695 805.984 1,777.679 HM&E (9) SSBN 827 (In Support of AC) 24-60 Various - - 0.000 - - - - SSBN 828 (In support of AC) 24-60 Various 5.860 - 0.000 - - - - SSBN 829 (In Support of AC) 24-60 Various 31.468 8.415 0.000 - - - - SSBN 830 (In Support of AC) 24-60 Various 38.147 28.330 11.068 - - - - SSBN 831 (In Support of AC) 24-60 Various - 43.408 23.996 11.861 - - - SSBN 832 (In Support of AC) 24-60 Various - 6.049 39.329 24.132 11.459 - - SSBN 833 (In Support of AC) 24-60 Various - - 0.000 45.448 25.614 11.940 - SSBN 834 (In Support of AC) 24-60 Various - - 0.000 6.293 41.211 25.013 12.272 SSBN 835 (In Support of AC) 24-60 Various - - 0.000 6.293 - 42.185 25.475 SSBN 836 (In Support of AC) 24-60 Various - - 0.000 6.293 - - 43.182 SSBN 837 (In Support of AC) 24-60 Various - - 0.000 6.293 - - - SSBN 838 (In Support of AC) 24-60 Various - - 0.000 6.293 - - - SSBN 839 (In Support of AC) 24-60 Various - - 0.000 6.250 - - - 75.475 86.202 74.393 119.156 78.284 79.138 80.929 Total: HM&E (9) ORDNANCE SWS SHIPBOARD SYSTEMS (10) - LLTM SSBN 827 (In Support of AC) 12-48 Various - - 0.000 - - - - SSBN 828 (In Support of AC) 12-48 Various 20.445 - 0.000 - - - - SSBN 829 (In Support of AC) 12-48 Various 60.219 29.510 0.000 - - - - SSBN 830 (In Support of AC) 12-48 Various 44.826 46.009 18.546 - - - - SSBN 831 (In Support of AC) 12-48 Various 5.429 35.875 59.092 21.097 - - - SSBN 832 (In Support of AC) 12-48 Various - 12.952 36.316 60.424 28.275 - - SSBN 833 (In Support of AC) 12-48 Various - - 5.803 36.097 58.757 25.280 - SSBN 834 (In Support of AC) 12-48 Various - - 0.000 5.597 37.218 70.713 7.678 SSBN 835 (In Support of AC) 12-48 Various - - 0.000 - 7.356 70.397 41.555 LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 4 of 15 P-1 Line #2 Volume 1 - 30 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) SSBN 836 (In Support of AC) 12-48 Various - - 0.000 - - 8.116 29.779 SSBN 837 (In Support of AC) 12-48 Various - - 0.000 - - - - Total: ORDNANCE SWS SHIPBOARD SYSTEMS (10) - LLTM 130.919 124.346 119.757 123.215 131.606 174.506 79.012 ORDNANCE SWS SHIPBOARD SYSTEMS (11) - ECONOMIC ORDER QUANTITY SSBN 827 12-24 Various - - 0.000 - - - - SSBN 828 12-24 Various SSBN 829 12-24 Various 0.255 - 0.000 - - - - 0.255 0.250 0.000 - - - SSBN 830 12-24 - Various 0.255 0.250 0.731 - - - SSBN 831 - 12-24 Various 0.255 0.250 0.731 0.250 - - - SSBN 832 12-24 Various 0.669 0.250 0.731 0.250 0.250 - - SSBN 833 12-24 Various 0.669 0.899 0.731 0.250 0.250 0.250 - SSBN 834 12-24 Various 0.669 0.899 0.731 0.250 0.250 0.250 0.250 SSBN 835 12-24 Various 0.672 0.899 0.731 0.252 0.250 0.250 0.250 SSBN 836 12-24 Various 0.667 0.913 0.731 0.250 0.250 1.587 0.250 SSBN 837 12-24 Various 0.669 0.899 0.731 0.249 0.250 1.587 2.450 SSBN 838 12-24 Various - - 0.000 7.650 0.815 0.840 0.865 SSBN 839 12-24 Various - - 0.000 7.650 0.800 0.840 0.865 5.035 5.509 5.848 17.051 3.115 5.604 4.930 Total: ORDNANCE SWS SHIPBOARD SYSTEMS (11) - ECONOMIC ORDER QUANTITY ORDNANCE SWS SHIPBOARD SYSTEMS (12) - CONTINUOUS PRODUCTION SSBN 828 12-24 Various - - 0.000 - - - - SSBN 829 12-24 Various 1.870 7.376 0.000 - - - - SSBN 830 12-24 Various 28.871 6.000 5.597 - - - - SSBN 831 12-24 Various 31.735 39.441 11.597 - - - - SSBN 832 12-24 Various 9.039 32.778 38.361 - - - - SSBN 833 12-24 Various 9.062 5.998 36.131 43.517 - - - SSBN 834 12-24 Various 6.206 7.721 27.064 30.026 40.685 - - SSBN 835 12-24 Various - 8.891 7.368 46.578 29.192 9.782 - SSBN 836 12-24 Various - - 9.437 16.083 0.589 35.804 42.870 LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 5 of 15 P-1 Line #2 Volume 1 - 31 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 First System (2027) Award Date: October 2020 First System (2027) Completion Date: October 2027 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) SSBN 837 12-24 Various - - 0.000 18.136 8.479 38.628 - SSBN 838 12-24 Various - - 0.000 - 11.874 8.151 42.363 SSBN 839 12-24 Various - - 0.000 - - 12.230 8.396 90.819 104.595 93.629 Total: ORDNANCE SWS SHIPBOARD SYSTEMS (12) - CONTINUOUS PRODUCTION 86.783 108.205 135.555 154.340 ELECTRONICS (13) SSBN 827 12-24 Various - - 0.000 - - - - SSBN 828 12-24 Various 50.316 - 0.000 - - - - SSBN 829 12-24 Various 19.538 85.951 0.000 - - - - SSBN 830 12-24 Various - 24.650 56.620 - - - - SSBN 831 12-24 Various - - 25.140 57.752 - - - SSBN 832 12-24 Various - - 0.000 25.643 58.907 - - SSBN 833 12-24 Various - - 0.000 - 26.156 60.086 - SSBN 834 12-24 Various - - 0.000 - - 26.679 61.287 SSBN 835 12-24 Various - - 0.000 - - - 27.212 81.760 83.395 85.063 86.765 88.499 Total: ELECTRONICS (13) 69.854 110.601 Electronics EOQ (14) SSBN 828 24-36 Various 11.900 - 0.000 - - - - SSBN 829 24-36 Various 11.900 - 0.000 - - - - SSBN 830 24-36 Various 11.900 - 0.000 - - - - SSBN 831 24-36 Various 11.900 - 0.000 - - - - SSBN 832 24-36 Various 11.900 - 0.000 - - - - Total: Electronics EOQ (14) Total Advance Procurement/Obligation Authority 59.500 6,215.939 5,350.766 4,763.342 5,363.445 4,916.623 6,078.750 5,716.743 *Note: "When Required" is the number of months required before ship delivery. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 6 of 15 P-1 Line #2 Volume 1 - 32 === page 83 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) PLANS (1) Supplier Development- Maritime Industrial Base - SSBN 837 (2) 12-60 Various - SSBN 829 12-60 Various - SSBN 830 12-60 Various - SSBN 831 12-60 Various - SSBN 832 12-60 Various SSBN 833 12-60 SSBN 834 SSBN 835 SSBN 838 Oct 2026 - 2035 788.000 - 2027 0.000 Oct 2026 - 2028 14.914 Oct 2026 - 2029 6.765 - - 2030 0.000 Various - - 2031 0.000 12-60 Various - - 2032 0.000 12-60 Various - - 2033 0.000 12-60 Various - - 2036 Total: PLANS (1) 0.000 809.679 BASIC CONSTRUCTION (3) - SHIPBUILDER PROCURED LLTM SSBN 829 24-54 Various - - 2028 0.000 SSBN 830 24-54 Various - SSBN 831 24-54 Various - Oct 2026 - 2028 377.151 Oct 2026 - 2028 SSBN 832 24-54 Various - 371.093 Oct 2026 - 2030 SSBN 833 24-54 Various 167.177 - - 2031 0.000 SSBN 834 24-54 SSBN 835 24-54 Various - - 2032 0.000 Various - - 2033 SSBN 836 24-54 0.000 Various - - 2034 Total: BASIC CONSTRUCTION (3) - SHIPBUILDER PROCURED LLTM 0.000 915.421 BASIC CONSTRUCTION (4) - MISSILE TUBE CONTINUOUS PRODUCTION & OUTFITTING SSBN 829 36-42 Various - SSBN 830 36-42 Various - SSBN 831 36-42 Various - Oct 2026 SSBN 832 36-42 Various - SSBN 833 36-42 Various - SSBN 834 36-42 Various - SSBN 835 36-42 Various - SSBN 836 36-42 Various - LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 7 of 15 - 2027 - 2028 0.000 - 2029 59.640 Oct 2026 - 2030 149.678 Oct 2026 - 2031 65.030 Oct 2026 - 2032 22.999 - 2033 0.000 - 2034 0.000 P-1 Line #2 0.000 Volume 1 - 33 === page 84 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) SSBN 837 36-42 Various - - 2035 0.000 SSBN 838 36-42 Various - - 2036 0.000 Total: BASIC CONSTRUCTION (4) - MISSILE TUBE CONTINUOUS PRODUCTION & OUTFITTING 297.347 BASIC CONSTRUCTION (5) - ADVANCE CONSTRUCTION SSBN 829 24-42 Various - - 2027 0.000 SSBN 830 24-42 Various - SSBN 831 24-42 Various - Oct 2026 - 2028 460.279 Oct 2026 - 2029 SSBN 832 24-42 Various - 127.908 Oct 2026 - 2030 SSBN 833 24-42 Various 35.149 - - 2031 0.000 SSBN 834 24-42 SSBN 835 24-42 Various - - 2032 0.000 Various - - 2033 SSBN 836 24-42 0.000 Various - - 2034 Total: BASIC CONSTRUCTION (5) - ADVANCE CONSTRUCTION 0.000 623.336 BASIC CONSTRUCTION (6) - EOQ IN SUPPORT OF MULTI-PROGRAM PROCUREMENT SSBN 829 24-42 Various - - 2027 0.000 SSBN 830 24-42 Various - - 2027 0.000 SSBN 831 24-42 Various - - 2029 0.000 SSBN 832 24-42 Various - - 2030 0.000 SSBN 833 24-42 Various - - 2031 0.000 SSBN 834 24-42 Various - - 2032 0.000 SSBN 835 24-42 Various - - 2032 0.000 SSBN 836 24-42 Various - - 2033 0.000 SSBN 837 - Production Backup Units 24-42 Various - - 2035 172.483 SSBN 838 24-42 Various - - 2036 0.000 SSBN 839 24-42 Various - - 2037 0.000 Oct 2026 Total: BASIC CONSTRUCTION (6) - EOQ IN SUPPORT OF MULTIPROGRAM PROCUREMENT 172.483 BASIC CONSTRUCTION (7) - SHIPYARD MANUFACTURED ITEMS CONTINUOUS PRODUCTION SSBN 829 LI 1045 - COLUMBIA Class Submarine Navy 12-36 Various UNCLASSIFIED Page 8 of 15 - - P-1 Line #2 2027 0.000 Volume 1 - 34 === page 85 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) SSBN 830 12-36 Various - Oct 2026 - 2028 10.395 SSBN 831 12-36 Various - Oct 2026 - 2029 9.694 SSBN 832 12-36 Various - Oct 2026 - 2030 6.339 SSBN 833 12-36 Various - Oct 2026 - 2031 5.064 SSBN 834 12-36 Various - Oct 2026 - 2032 5.096 SSBN 835 12-36 Various - - 2033 0.000 SSBN 836 12-36 Various - - 2034 1.031 SSBN 837 12-36 Various - - 2035 0.000 SSBN 838 12-36 Various - - 2036 0.000 SSBN 839 12-36 Various - - 2037 0.000 Oct 2026 Total: BASIC CONSTRUCTION (7) - SHIPYARD MANUFACTURED ITEMS CONTINUOUS PRODUCTION 37.619 NUCLEAR PROPULSION PLANT EQUIPMENT (8) SSBN 829 (In Support of AC) 30-72 Various - - 2027 SSBN 830 (In support of AC) 30-72 Various - SSBN 831 (In Support of AC) 30-72 Various - Oct 2026 SSBN 832 (In Support of AC) 30-72 Various - Oct 2026 SSBN 833 (In Support of AC) 30-72 Various SSBN 834 (In Support of AC) 30-72 Various SSBN 835 30-72 SSBN 836 30-72 - 2028 0.000 - 2029 760.323 - 2030 729.821 - - 2031 0.000 - - 2032 0.000 Various - - 2033 0.000 Various - - 2034 0.000 Total: NUCLEAR PROPULSION PLANT EQUIPMENT (8) 0.000 1,490.144 HM&E (9) SSBN 829 (In Support of AC) 24-60 Various - SSBN 830 (In Support of AC) 24-60 Various - SSBN 831 (In Support of AC) 24-60 Various - SSBN 832 (In Support of AC) 24-60 Various - SSBN 833 (In Support of AC) 24-60 Various SSBN 834 (In Support of AC) 24-60 Various SSBN 836 (In Support of AC) 24-60 Various LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 9 of 15 - 2028 0.000 Oct 2026 - 2029 11.068 Oct 2026 - 2029 23.996 Oct 2026 - 2030 39.329 - - 2031 0.000 - - 2032 0.000 - - 2027 0.000 P-1 Line #2 Volume 1 - 35 === page 86 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) SSBN 837 (In Support of AC) 24-60 Various - - 2028 0.000 SSBN 838 (In Support of AC) 24-60 Various - - 2028 0.000 SSBN 839 (In Support of AC) 24-60 Various - - 2028 Total: HM&E (9) 0.000 74.393 ORDNANCE SWS SHIPBOARD SYSTEMS (10) - LLTM SSBN 829 (In Support of AC) 12-48 Various - - 2027 0.000 SSBN 830 (In Support of AC) 12-48 Various - Oct 2026 - 2029 18.546 SSBN 831 (In Support of AC) 12-48 Various - Oct 2026 - 2029 59.092 SSBN 832 (In Support of AC) 12-48 Various - Oct 2026 - 2030 36.316 SSBN 833 (In Support of AC) 12-48 Various - Oct 2026 - 2032 5.803 SSBN 834 (In Support of AC) 12-48 Various - - 2032 0.000 SSBN 835 (In Support of AC) 12-48 Various - - 2033 0.000 SSBN 836 (In Support of AC) 12-48 Various - - 2034 0.000 SSBN 837 (In Support of AC) 12-48 Various - - 2035 0.000 Total: ORDNANCE SWS SHIPBOARD SYSTEMS (10) - LLTM 119.757 ORDNANCE SWS SHIPBOARD SYSTEMS (11) - ECONOMIC ORDER QUANTITY SSBN 829 12-24 Various - - 2027 0.000 SSBN 830 12-24 Various - SSBN 831 12-24 Various - Oct 2026 - 2028 0.731 Oct 2026 - 2029 SSBN 832 12-24 Various 0.731 - Oct 2026 - 2030 0.731 SSBN 833 12-24 SSBN 834 12-24 Various - Oct 2026 - 2031 0.731 Various - Oct 2026 - 2032 SSBN 835 0.731 12-24 Various - Oct 2026 - 2033 0.731 SSBN 836 12-24 Various - Oct 2026 - 2034 0.731 SSBN 837 12-24 Various - Oct 2026 - 2035 0.731 SSBN 838 12-24 Various - - 2036 0.000 SSBN 839 12-24 Various - - 2037 0.000 Total: ORDNANCE SWS SHIPBOARD SYSTEMS (11) - ECONOMIC ORDER QUANTITY 5.848 ORDNANCE SWS SHIPBOARD SYSTEMS (12) - CONTINUOUS PRODUCTION LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 10 of 15 P-1 Line #2 Volume 1 - 36 === page 87 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) SSBN 829 12-24 Various - - 2027 SSBN 830 12-24 Various - Oct 2026 - 2028 5.597 SSBN 831 12-24 Various - Oct 2026 - 2029 11.597 SSBN 832 12-24 Various - Oct 2026 - 2030 38.361 SSBN 833 12-24 Various - Oct 2026 - 2031 36.131 SSBN 834 12-24 Various - Oct 2026 - 2032 27.064 SSBN 835 12-24 Various - Oct 2026 - 2033 7.368 SSBN 836 12-24 Various - Oct 2026 - 2034 9.437 SSBN 837 12-24 Various - - 2035 0.000 SSBN 838 12-24 Various - - 2036 0.000 SSBN 839 12-24 Various - - 2037 0.000 Total: ORDNANCE SWS SHIPBOARD SYSTEMS (12) - CONTINUOUS PRODUCTION 0.000 135.555 ELECTRONICS (13) SSBN 829 12-24 Various - - 2027 0.000 SSBN 830 12-24 Various - Oct 2026 - 2028 56.620 SSBN 831 12-24 Various - Oct 2026 - 2029 25.140 SSBN 832 12-24 Various - - 2030 0.000 SSBN 833 12-24 Various - - 2031 0.000 SSBN 834 12-24 Various - - 2032 0.000 SSBN 835 12-24 Various - - 2033 0.000 Total: ELECTRONICS (13) 81.760 Electronics EOQ (14) SSBN 829 24-36 Various - - 2027 0.000 SSBN 830 24-36 Various - - 2028 0.000 SSBN 831 24-36 Various - - 2029 0.000 SSBN 832 24-36 Various - - 2030 0.000 Total: Electronics EOQ (14) - Total Advance Procurement/Obligation Authority 4,763.342 Description: LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 11 of 15 P-1 Line #2 Volume 1 - 37 === page 88 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Footnotes: Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine In support of the August 2020 Lead Ship Authorization In Progress Review, the program completed an updated cost estimate update in 2020 and cost changes were reflected in the FY2022 budget submission. SSBN 826-837 requirements are updated to the NAVSEA 05C's 2024 cost estimate. The program is completing an updated cost estimate and CAPE Independent Cost Estimate (ICE) to support Build II contract negotiation and award. Program Advance Procurement (AP) profiles/phasing of funding reflect the continuation of Integrated Enterprise Plan (IEP) funding initiatives (IEP initiatives adjust phasing of funding, not increase program funding) and the Advance Construction (AC) profile reflects the IEP AP re-phase initially from the 2021 cost estimate. The IEP AC re-phase accelerates ship delivery schedules to reduce the strategic deterrence coverage gaps during transition from OHIO SSBNs to CLB SSBNs and the transition from D5LE to D5LE2 missiles. It is crucial to maintain force structure necessary to meet USSTRATCOM requirements for Sea-Based Strategic Deterrence (SBSD). The FY 2027 budget reflects the addition of two more COLUMBIA ships' (SSBN838 and SSBN839) advanced procurement (AP) funding beginning in FY 2028, which allows for ordering long-lead materials and executing life-of-type buys. This timing is essential to avoid breaks in current production lines and prevent the need for additional component redesign efforts. The addition of SSBN838 and SSBN839 is tentative pending the Navy SSBN Force Structure study. (1) PLANS: COLUMBIA Class Lead Design Yard and program office support for the detail design for the Common Missile Compartment, Strategic Weapons System, Propulsion Plant, and Rest of Ship. The Program achieved OSW MDA assigned 83% design maturity target in May 2020 (the requirement to start construction) and was 81.2% design disclosure completion for the entire ship at construction start (October 2020). This design maturity target was necessary to achieve the aggressive 7 year lead ship construction time for the lead ship and subsequent construction spans for the Class, which is required to support Strategic Deterrent mission requirements - there is no margin to patrol dates. Detail design activities also support critical engineering analysis and risk reduction efforts. This line reflects adjustments made based on the award of the Integrated Product and Process Development (IPPD) contract. Efforts to reduce construction spans from 84 to 70 months include continued schedule risk mitigation through ongoing advanced procurement authorities, strategic outsourcing to increase parallel construction, expansion of the industrial base to meet increased generational demand, shipyard facilities expansion to increase capacity/throughput, workforce development to drive recruitment and proficiency, continuous production of material to improve material availability, and incorporating lessons learned to streamline future hull construction. (2) SUPPLIER DEVELOPMENT: The Department added an additional $1,763.6M in FY 2028 through FY 2031 for the MIB to execute Supplier Development to de-risk construction schedules, strengthen maritime industrial base health, ensure on-time delivery of quality components and increase sub-vendors' ability to accept shipbuilder outsourced work required to mitigate capacity and manpower constraints at both yards. These funds execute supplier improvement and facilitization actions to increase capability of existing suppliers, support strategic offload of large scale fabrication and heavy manufacturing, ensure needed infrastructure/facilities to support submarine construction, address industrial base workforce challenges and trade skill gaps, and implement and scale manufacturing technology that supports overall material readiness. The majority of the $1,763.6M is to fund the tail of the SIB-25 study, which previously ended in FY28. Investment in the sub-vendor supplier base is required to promote facilities investment and vendor qualification to ensure adequate industrial capacity, and reduce COLUMBIA Class construction schedule risk. Investments are targeted to support uplift of the Maritime Industrial Base (MIB) to achieve a "1 +2 " Production Cadence, strengthening the MIB and reprioritizing/growing infrastructure to support new construction goals and increased demand as well as improved maintenance and sustainment for the submarine fleet. The FY2027 request ($788M FY27) for MIB investment is accounted for in SSBN 837 supplier development under Plans. MIB funding is to support the generational increase in demand across the enterprise. These investment efforts will support improvements in MIB execution to support the Navy plan of serial production of 1 COLUMBIA plus 2 VIRGINIAs starting in 2028. - Supplier Development ($259M FY27): The number of MIB suppliers significantly decreasing over the last 40 years has put a strain on the current MIB to meet DoW standards at the planned higher demand. EB and NNS, collaboratively with the Navy, have implemented the Critical Supplier Readiness Assessment process to identify supplier shortfalls, impacts to sequence critical material, and challenged market spaces. Additional investment is needed to address these challenges and bottlenecks by expanding the capacity of existing suppliers and standing up new sources. While prior year funding was provided to the Navy, this additional Navy funding request is based on Navy, CAPE, and shipbuilder projections for continuing needs to reduce MIB supplier base risk. - Shipyard Infrastructure ($40M FY27): The changes in the Navy's 30 Year Shipbuilding Plan to increase CLB's to one ship per year in addition to VIRGINIA Class (VCS) authorization of two ships per year (referred to as 1+2) has presented a significant challenge to shipbuilders and their suppliers. Despite previous investments to facilities, shipbuilders are not meeting schedules/required cadence and require additional MIB investment to reach required 1+2 production rates. The priorities for these investments are to complete current facilities efforts at EB and NNS, increase NNS infrastructure to support the required 1+2 rate capacity with needed resiliency, and add resiliency to Quonset Point's fabrication facilities and Groton's post-launch and Post Shakedown Availability (PSA) waterfront. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 12 of 15 P-1 Line #2 Volume 1 - 38 === page 89 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine - Strategic Outsourcing ($25M FY27): Shipbuilders do not have sufficient capacity to accommodate CLB and VIRGINIA Class (VCS) concurrent production without strategically outsourcing workload to qualified suppliers. MIB investments will support continued development of outsourcing partners to rapidly achieve schedule and quality proficiency. This investment covers shipbuilder and supplier efforts at the suppliers' facilities that makes strategic outsourcing possible and the costs to develop strategic outsourcing partners' capacity and capability to complete the work. - Workforce Development ($129M FY27): The MIB currently faces labor/workforce challenges as a result of a shift away across the nation from manufacturing careers and turnover. These manufacturing jobs require high demand technical skillsets. Hiring employees outside of shipbuilding requires extensive training to meet submarine shipbuilding high standards. MIB investment provides funding for numerous pipeline training programs and workforce development in key areas around the country. It also addresses attraction and recruitment efforts required to fill training pipelines and build bench strength for sustained workforce requirements. - Government Oversight ($4M FY27): required levels of shipyard and industrial base oversight of quality and process. These efforts include resources required to meet the strategic outsourcing of 6M or more man hours per year from the shipyards to key industry partners. - Technology Opportunities ($331M FY27): Limited number of foundries are capable of producing forgings and castings is leading to challenges meeting current demand, as well as the planned increase in future demand. Long lead times for castings and forgings, in addition to quality issues, are creating schedule risk and resource inefficiencies. Additive Manufacturing (AM) is a technology that has capability to produce some of these components. Transitioning/qualifying some of the supplier base from traditional casting to AM and digital manufacturing could address current concerns/issues, but requires dedicated investment. Secondly, non-destructive testing (NDT) continues to be a challenge area across the supplier base. Investment is needed to improve NDT process, training, and qualification. Lastly, implementation of advanced/ modern manufacturing methods/techniques, inclusive of automation, robotics, and other technologies, may be required to support the generational increase in submarine demand. (3) SHIPBUILDER PROCURED LLTM: Funding is required to support long lead time shipbuilder procured material (for example the Weapons Handling, Air Conditioning Unit, Diesel Generator Set, non-nuclear propulsion equipment, and Reverse Osmosis Unit). These and other components are required early in the construction phase to meet the delivery schedule. 3 Year AP is required for long lead shipbuilder procured equipment for ships 2-12 as determined through actual production spans on recently-completed prototype equipment and updated shipbuilder required-in-yard need dates to support advance construction and serial production of follow-on COLUMBIA hulls. Without these efforts the construction schedules are not supported. SSBN 829, and 830 LLTM values are lower as funding is also reflected in EOQ to support multiprogram procurement to mitigate construction risk and strengthen maritime industrial base (see foot note #6 - funds are reflected in this category). The LLTM profile was adjusted to account for these changes/increases in FY27 and out. (4) MISSILE TUBE CONTINUOUS PRODUCTION & OUTFITTING: COLUMBIA Class continues to execute Continuous Production of Missile Tubes to reduce schedule risk, improve manufacturing efficiencies, improve vendor learning, maintain critical production skills, and reduce costs by leveraging high-volume procurements. These benefits increase schedule margin (needed to support schedules) and reduce risk to follow ship deliveries, while also achieving cost reduction savings. Missile Tubes produced for SSBN 826 are funded through RDT&E,N Program Element 0603595N, Project Number 3220. Missile Tube Outfitting is required to continue the efforts from Missile Tube Continuous Production to support construction schedules. Missile Tube Outfitting funding provides labor in support of outfitting Missile Tubes procured under Continuous Production for the COLUMBIA Class. In addition to reducing risk to COLUMBIA on-time ship delivery, this effort is estimated to generate savings throughout the class build through workforce level loading, minimizing the effects of gaps or large variations in demand and procurement efficiencies. (5) ADVANCE CONSTRUCTION: Advance Construction (AC) efforts are to de-risk construction schedule and improve probability of on-time delivery. AC begins construction activities in key areas to gain schedule margin and reduce controlling path risks. AC is executed across all six super modules (SMs) with key areas including, but are not limited to, the Bow (Sections 1A and 1B in SM1 that includes the forward Ballast Tanks and Hemi-head), Stern (Sections 9B and 9C in SM6 that includes the X-Stern and aft Ballast Tanks and Hemi-Head) and Common Missile Compartment (CMC) adjacent areas contained in SM2 that include the Missile Compartment Control Module (MCCM). AC is normally, but not limited to, structural fabrication areas that have sufficient design maturity and material availability to begin construction and some outfitting. These areas include MCCM Deck Module Fabrication, Mid-Span Tank complex and Foundation Fabrication, and Missile Compartment Forward Bulkhead and S2C Hull Cylinder Fabrication. AC efforts improve efficiency by smoothing workload at Quonset Point, NNS, and capture efficiencies. Included in AC are required efforts to support the Integrated Enterprise Plan (IEP) construction schedules for SSBNs 827-837 which enable ability to deliver ships earlier to reduce strategic coverage gaps. (6) EOQ IN SUPPORT OF MULTI-PROGRAM MATERIAL PROCUREMENT (MPMP): COLUMBIA continues to execute MPMP to align shipbuilder procured material procurements with COLUMBIA Class funding with funds budgeted for VIRGINIA Class (LI 2013) and CARRIERS (CVN) (Line Items 2001 and 2004) for common components and vendors, where applicable. Economic Order Quantity (EOQ) for Build II helps to de-risk schedules and level load the supplier base. Advance Procurement (AP) is used to execute coordinated material procurements to align COLUMBIA Build II Multi-Program Material Procurement and VIRGINIA Class (VCS) material placements for common components and vendors. Appreciable risk mitigation is provided for COLUMBIA Class construction schedules through acceleration of material procurement, ensuring increased readiness to support construction need dates and through supplier base management and workload leveling. MPMP strengthens the industrial base to improve material availability and avoid construction delays due to late material. COLUMBIA Class Production Backup Units procure critical long lead time material to serve as rolling construction assets throughout COLUMBIA LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 13 of 15 P-1 Line #2 Volume 1 - 39 === page 90 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine Class construction to be consumed in the event of unforeseen issues from late material or obsolescence to reduce schedule risk and avoid production disruptions from late material and ensure Required In Yard (RIY) dates are met for compressed shipbuilding schedules. FY2027 submission continues funding and phasing to support executing additional Production Backup Unit (PBU) efforts to strengthen the sub-tier industrial base and continue to reduce COLUMBIA Class schedule risk to the IEP schedules through supplier base management. PBU material not consumed during construction will be consumed on the 12th hull if not used. PBUs also strengthen critical at-risk vendors in the sub-tier industrial base, reducing the risk of future obsolescence issues and production disruptions. Funding supports the transition of Integrated Power System from GFE to CFE starting with SSBN 828. (7) SY MANUFACTURED ITEMS CONTINUOUS PRODUCTION: COLUMBIA Class continues to execute Continuous Production of selected Shipyard Manufactured Items (U.S. Code 10 2218a subsection (i)) to reduce schedule risk, improve manufacturing efficiencies, improve learning, maintain critical production skills, and reduce costs by leveraging high-volume procurements. Continuous production of items with long lead time material requirements which are difficult to manufacture helps ensure critical material is available to support construction schedules. These benefits will increase schedule margin and reduce risk to follow ship deliveries, while also achieving cost reduction savings through workforce level loading and minimizing the effects of large variations in demand and procurement efficiencies. Examples of Shipyard Manufactured Items include Spherical Air Flasks, Hull Valves, Logistics Escape Trunks, Torpedo Tubes, large vertical array, and stern and bow super module components. Funding is aligned with the 2022 program estimate. Funding levels are based on specific components aligned with 828-830, based on requirements for CP items. (8) NUCLEAR PROPULSION PLANT EQUIPMENT: Propulsion Plant Equipment Advanced Procurement is required to fund long-lead time propulsion plant equipment to support the COLUMBIA Class' implementation of advanced modular construction methods, and meet shipbuilder required-in-yard dates in support of advance construction and serial production of follow-on COLUMBIA hulls. The component fabrication and delivery timeline is different than that of the VIRGINIA Class submarines due to COLUMBIA component production spans and shipbuilder production needs. Without three-year AP, the construction schedules are not supported. (9) HM&E: Hull Mechanical & Electrical AP is required to align the Propulsor procurement and production schedule with COLUMBIA Class Advance Construction schedule acceleration and support the overall ship schedules. Funding supports Continuous Production of Propulsors for SSBN 828 - SSBN 837 material and labor. This enables level loading of Naval Foundry and Propeller Center resources and will provide needed schedule execution to mitigate the risk of supporting the accelerated shipbuilder construction schedules per the IEP. Funding supports COLUMBIA Class construction, reducing risk of construction schedule delays and cost growth, thereby ensuring nation's strategic deterrence requirements are met. (10) ORDNANCE SWS SHIPBOARD SYSTEMS - LLTM: Ordnance Strategic Weapons Systems (SWS) Shipboard Systems AP is required to fund Long Lead Time Material (LLTM) for the Strategic Weapon System (SWS) shipboard components to meet COLUMBIA (CLB) Class Government Furnished Equipment (GFE) Required-In-Yard (RIY) dates to support construction activities for CLB. AP is required to procure selected SWS Launcher, Fire Control and Navigation Subsystem components including launch tube assemblies and construction support equipment, launch tube umbilical housings, launcher ejector group and vertical support group equipment; Fire Control power and network equipment and sub-assemblies; and Fire Control and Navigation common infrastructure. The SWS shipboard components have a lead time of 12-48 months and are required by the shipbuilder early in the construction phase to meet the ship delivery schedule. (Note: SWS components requiring 48 month lead time for SSBN 826 are procured through RDT&E,N Program Element 0603595N, Project Number 3220 in support of lead ship Missile Tube Module prototyping.) A delay to these LLTM purchases will impact the U.S. Navy's ability to meet the shipbuilder's RIY dates for tactical hardware resulting in increased schedule risk to construction and ship delivery. Since the FY2021 submission, in order to support the Integrated Enterprise Plan schedule, required-in-yard dates for Launcher, Fire Control and Navigation subsystem components were reevaluated and subsequent rephasing was required to minimize risk to meet the COLUMBIA construction schedules. This line does not fund any efforts related to the development and procurement of the TRIDENT II D5 Life Extension (D5LE) Missile or TRIDENT II D5 Life Extension 2 (D5LE2) Missile (however, CLB SWS is dependent on these efforts to ensure the system maintains demonstrated performance and remains survivable while facing a dynamic threat environment until COLUMBIA end of life). Changes since FY2025 reflect alignment to updated Required-In-Yard dates for Block II SWS GFE, incorporation of the Pre-Inactivation Restricted Availability Program of Record and updated costs for material inflation and labor rates. A small amount of SWS sub-system level components are planned to be reused from OHIO on CLB. Extended OHIO inactivation dates impact the ability to remove these components from OHIO in time to support CLB construction build schedules, thus driving increased costs and lead times to procure and manufacture new components (vice reuse/refurb costs and schedule). (11) ORDNANCE SWS SHIPBOARD SYSTEMS - EOQ: Ordnance SWS Shipboard Systems EOQ funding is required for large lot procurements of SWS shipboard components to mitigate significant obsolescence, requalification and vendor risk while ensuring SWS homogeneity and consistent SWS system performance across all COLUMBIA Class hulls. Examples include SWS Launcher Subsystem Detonator Power Assembly electronics components and SWS Fire Control Subsystem components such as network switch memory and flash devices, Navigation Timing Interface Module oscillators and display units. Funding enables opportunities to mitigate obsolescence and construction schedule risks and realize additional cost savings outside the FYDP. This line does not fund any efforts related to the development and procurement of the TRIDENT II D5 Life Extension (D5LE) Missile or TRIDENT II D5 Life Extension 2 (D5LE2) Missile. (12) ORDNANCE SWS SHIPBOARD SYSTEMS- CONTINUOUS PRODUCTION: Ordnance SWS Shipboard Systems Continuous Production (U.S. Code 10 2218a subsection (i)) of SWS Navigation Subsystem, Inertial Navigation Systems and Gyros and Launcher Subsystem Launch tubes and on-tube components is required to procure critical components to ensure homogeneity and consistent SWS system performance across the SWS unit builds, maintain critical production and fabrication skills, eliminate production re-starts and potential re-qualification risk while gaining manufacturing efficiencies and mitigating LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 14 of 15 P-1 Line #2 Volume 1 - 40 === page 91 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 01 / 1 Date: April 2026 P-1 Line Item Number / Title: 1045 / COLUMBIA Class Submarine SWS Subsystem obsolescence across all COLUMBIA Class hulls during construction. These benefits will reduce schedule risk by ensuring on-time deliveries of SWS GFE to the shipbuilder, support the IEP ship schedules, and result in cost savings outside of the FYDP. Follow-on procurements are outside the FYDP. This line does not fund any efforts related to the development and procurement of the TRIDENT II D5 Life Extension (D5LE) Missile or TRIDENT II D5 Life Extension 2 (D5LE2) Missile. (13) ELECTRONICS: Electronics Equipment AP is required to fund the GFE material that has either a long-lead procurement time or is required to meet shipbuilding contract early construction delivery requirements. Material includes SONAR hydrophones for the bow array, the Low Cost Conformal Array, the WSQ-9 arrays, and a wide range of components required to outfit the Command and Control System Module (CCSM) where the predominant portion of the C5I system electronics reside. Changes since the FY2026 budget reflect early Build II GFE construction need dates and response to longer supply chain lead times requiring additional funds in advance procurement. SSBN 828 construction span is 77 months, or 3 months shorter than SSBN 827, and has ~110 GFE items due within 12 months of FF authorization and ~260 items total within 24 months of FF. Subsequent hulls reduce construction span 1 additional month each from the previous build, against prime electronics contractor lead time trends growing for most electronic components. As a result, additional 2 year AP is required for the Combat Control, UMM, EW, ECS, and Navigation subsystems, and additional 1 year AP is required for the SONAR, Combat Control, CANES, ECS, Navigation, and BRR-6 sub-systems. (14) ELECTRONICS EOQ MULTI-PROGRAM MATERIAL PROCUREMENT: Electronics EOQ (U.S. Code 10 2218a subsection (f)) procures select strategic mission essential components of the Exterior Communications System (ECS) in an FY25 bulk buy with VIRGINIA Class (VCS) Block VI 10 ship multi-year procurement. These components are the High Data Rate (HDR) Mast, OE-592 Multi-Function Mast (Qty 2), Digital Modular Radio (DMR), and the Navy Multiband Terminal (NMT). Note that Navy Multiband Terminal (NMT) has reached end-of-life, and FY25 represents last PEO C4I fleet wide order until redesign and certification of a replacement is completed. *Note: "When Required" is the number of months required before ship delivery. LI 1045 - COLUMBIA Class Submarine Navy UNCLASSIFIED Page 15 of 15 P-1 Line #2 Volume 1 - 41 === page 92 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 42 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2001 / Carrier Replacement Program Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 223 Resource Summary Prior Years Procurement Quantity (Units in Each) 3 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 - - - - - - FY 2029 FY 2030 1 To FY 2031 Complete - - Total 1 5 Gross/Weapon System Cost ($ in Millions) 41,184.377 0.000 0.000 0.000 0.000 0.000 0.000 10,410.753 0.000 0.000 3,888.300 55,483.430 Less PY Advance Procurement ($ in Millions) 9,253.301 - - - - - - 4,846.404 - - 3,888.300 17,988.005 Less Cost To Complete ($ in Millions) 3,553.160 - - - - - - - - - 3,553.160 23,632.297 - - - - - - 3,821.698 - - - 27,453.995 4,745.619 0.000 0.000 0.000 0.000 0.000 0.000 1,742.651 0.000 0.000 - 6,488.270 19,559.731 1,123.124 1,046.700 641.907 - 641.907 419.675 686.704 1,690.261 2,285.893 - 27,453.995 Full Funding TOA ($ in Millions) 24,305.350 1,123.124 1,046.700 641.907 - 641.907 419.675 2,429.355 1,690.261 2,285.893 - 33,942.265 Plus CY Advance Procurement ($ in Millions) 9,253.301 612.038 1,940.566 - 1,940.566 2,766.080 1,514.105 1,121.344 780.571 - 17,988.005 Plus Cost To Complete ($ in Millions) 2,843.160 236.000 150.000 324.000 - 324.000 Total Obligation Authority ($ in Millions) 36,401.811 1,359.124 1,808.738 2,906.473 0.000 2,906.473 Less Subsequent Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) - 3,185.755 - 3,943.460 2,811.605 3,066.464 - 3,553.160 - 55,483.430 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 890.169 64.813 101.780 125.843 - 125.843 81.050 40.000 52.645 162.158 248.272 1,766.730 Total ($ in Millions) 37,291.980 1,423.937 1,910.518 3,032.316 - 3,032.316 3,266.805 3,983.460 2,864.250 3,228.622 248.272 57,250.160 Gross/Weapon System Unit Cost ($ in Millions) 13,728.126 3,888.300 11,096.686 - - - - - - 10,410.753 - - Description: To provide credible, sustainable, independent forward presence during peacetime without access to land bases; operate as the cornerstone of a joint and/or allied maritime expeditionary force in response to crisis; and carry the war to the enemy through joint multi-mission offensive operations. The Navy designed the FORD Class aircraft carrier with the warfighting capability essential for the 21st century, and the flexibility and resilience to rapidly adapt to emerging threats. The Ford class incorporates advances in technology such as a new reactor plant, propulsion system, electric plant, Electromagnetic Aircraft Launch System (EMALS), Advanced Arresting Gear (AAG), machinery control, and integrated warfare systems that increase lethality, while lowering life cycle costs through reductions in maintenance and manning requirements. Increased Service Life Allowances (SLA) for weight and stability enable future modernization and the ability to adapt to new missions over the ship's 50-year life cycle. CVN 80 and CVN 81 were awarded under a two-ship buy. CVN 80 is a separate contract line item under the same contract as CVN 81, which allows discrete hull costs to be captured. The CVN 80/81 construction contract is a Fixed Price Incentive (Firm Target) (FPIF) contract type that limits the Navy's liability and incentivizes the shipyard's best performance. The contract language guarantees a single technical baseline for both ships, which allows the shipyard to re-use engineering rollover products, minimize changes between the two ships and leverages economic order quantities for equipment and material procurement. The Advanced Procurement (AP) funding in FY 2027 is the second of 3 years of AP funding for CVN 82. CVN 81 was moved to BLI 2004 in accordance with the Department of Defense Appropriations Act, 2020. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 1 of 40 P-1 Line #3 Volume 1 - 43 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2001 / Carrier Replacement Program Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 223 The FY 2027 request for Carrier Replacement Program includes $2,582,473 thousand and quantity of 0 of discretionary funding and $37,000 thousand and quantity of 0 of mandatory funding for a total of $2,619,473 thousand and a quantity of 0. The mandatory funds will be used to enhance the U.S surface maritime industrial base productivity specifically for firefighting improvements. Characteristics: Length Overall Beam Displacement Draft Systems: 1092 ft 134 ft 97,337 TONS 38.7 ft Electronics -SHIP SELF DEFENSE SYSTEM (SSDS) Production Status: CVN 79 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Jun 2015 141 months 193 months Mar 2027 Jul 2027 Jun 2028 CVN 80 Ordnance -ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) -AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) -ADVANCED ARRESTING GEAR (AAG) -MANUALLY OPERATED VISUAL LANDING AID SYSTEM (MOVLAS) (1) Jan 2019 146 months 146 months Mar 2031 Oct 2031 Sep 2032 Design Schedule Start / Issue Complete / Response Issue Date for TLR Apr 2004 N/A Issue Date for TLS Sep 2006 N/A Preliminary Design Jan 2003 Jul 2008 Contract Design May 2004 Apr 2008 Detail Design Jan 2004 Sep 2009 Request for Proposals Jul 2007 Oct 2007 Design Agent Huntington Ingalls Industries Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C BUDGET ESTIMATE Footnotes: (1) The CVN 80 delivery date shifted from July 2030 to March 2031 due to delay in critical path construction required for launch of the ship. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 2 of 40 P-1 Line #3 Volume 1 - 44 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs FY 2013 Qty (Each) 1 Change Orders (†) Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance Qty ($ M) Basic Construction/Conversion Electronics FY 2018 Total Cost (†) (†) Other Cost Total Ship Estimate Total Cost (Each) 898.865 ($ M) 1 433.200 8,463.156 9,245.487 432.065 284.992 263.359 396.759 2,041.582 2,524.461 30.302 23.121 1,149.651 1,415.776 130.990 134.119 13,409.970 14,457.915 Less Advance Procurement FY 2007 52.750 - Less Advance Procurement FY 2008 123.530 - Less Advance Procurement FY 2009 1,210.561 - Less Advance Procurement FY 2010 482.938 - Less Advance Procurement FY 2011 902.473 - Less Advance Procurement FY 2012 554.798 Less Advance Procurement FY 2016 Less Advance Procurement FY 2017 - - 862.358 - 1,370.784 Less Subsequent Full Funding FY 2014 917.553 - Less Subsequent Full Funding FY 2015 1,219.405 - Less Subsequent Full Funding FY 2016 1,569.543 - Less Subsequent Full Funding FY 2017 1,241.783 - Less Subsequent Full Funding FY 2018 2,556.384 - Less Subsequent Full Funding FY 2019 - 929.122 Less Subsequent Full Funding FY 2020 - 1,062.000 Less Subsequent Full Funding FY 2021 - 958.933 Less Subsequent Full Funding FY 2022 - 1,062.205 Less Subsequent Full Funding FY 2023 - 1,465.880 Less Subsequent Full Funding FY 2024 - 1,104.421 Less Subsequent Full Funding FY 2025 - 1,123.124 Less Subsequent Full Funding FY 2026 - 1,046.700 Less Subsequent Full Funding FY 2027 - 641.907 Less Subsequent Full Funding FY 2028 - 419.675 Less Subsequent Full Funding FY 2029 - 686.704 LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 3 of 40 P-1 Line #3 Volume 1 - 45 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a FY 2013 Qty (Each) FY 2018 Total Cost Qty ($ M) Less Subsequent Full Funding FY 2030 (Each) - Total Cost ($ M) 154.456 Less Cost to Complete FY 2022 291.000 - Less Cost to Complete FY 2023 461.700 - Less Cost to Complete FY 2024 624.600 - Less Cost to Complete FY 2025 236.000 - Less Cost to Complete FY 2026 150.000 - Less Cost to Complete FY 2027 324.000 Net P-1 Funding 490.952 1,569.646 Remarks: CVN 79 Increase of $214M from the FY 2026 budget submission. The increase within Basic Construction ($187.6M) and Change Orders ($19.3M) from the FY 2026 budget submission supports Advanced Arresting Gear (AAG) Water Twister MOD II testing, associated delay and disruption, time related services, continued Advanced Weapons Elevator (AWE) work, wage and overtime increases, surge in manning to support sea trials and preliminary acceptance and additional outside engineering and vendor support to provide a more complete ship at delivery. Realignments within Electronics ($3.582), Propulsion equipment $7.000M, HM&E $.317M, Other Costs $.745M and Ordnance $2.601M due to fact of life changes and actual execution to support the delivery of a fully capable ship in March 2027. CVN 80 Basic Construction: Increase of $191.156M from the FY 2026 budget submission to support economic price adjustments, government production engineering and waterfront construction support and revised requirements for nuclear shipyard firefighting enhancements. Ordnance: Increase of $11.200M from the FY 2026 budget submission due to proper pricing of Enterprise Air Surveillance Radar (EASR). Other Costs: Increase of $8.100M from the FY 2026 budget submission due to proper pricing of Material and Handling Equipment (MHE). LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 4 of 40 P-1 Line #3 Volume 1 - 46 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date CVN 79 Huntington Ingalls Industries, Newport News Shipbuilding 2013 Jun 2015 Feb 2011 Mar 2027 Huntington Ingalls Industries, Newport News Shipbuilding 2018 Jan 2019 Jan 2019 Mar 2031 Huntington Ingalls Industries, Newport News Shipbuilding 2029 Jul 2029 Jul 2029 Mar 2039 CVN 80 (1) CVN 82 Footnotes: (1) The CVN 80 delivery date shifted from July 2030 to March 2031 due to delay in critical path construction required for launch of the ship. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 5 of 40 P-1 Line #3 Volume 1 - 47 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2013 Electronics Qty FY 2018 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items CONSOLIDATED AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) 1 18.392 1 22.709 AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) 1 7.353 1 8.020 DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF SIGHT (EHF/VHF LOS) SAT 1 8.836 1 8.023 AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII 1 7.088 1 8.251 SPN-46, AUTOMATIC CARRIER LANDING SYSTEM 1 7.985 1 12.762 SHIP SELF DEFENSE SYSTEM (SSDS) 1 24.172 1 43.206 AN/SYY-1(V)1 AIR TRAFFIC CONTROL SYSTEM, SHIPBOARD 1 4.182 1 5.169 NAVY MULTI-BAND TERMINAL (NMT) 1 5.779 1 8.536 AN/SLQ-32(V)6, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 1 13.761 1 13.904 AN/SSQ-130(V)8, SHIP'S SIGNAL EXPLOITATION EQUIPMENT INCREMENT F 1 4.856 1 12.514 AN/SRC-66 (V)3 HFDAG 1 5.382 1 5.344 AN/USN-3(V)1 SATELLITE SIGNAL LANDING SYSTEM (SSLS) 1 9.607 0 - ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (eCASS) 1 39.605 1 39.900 OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER 0 - 1 6.122 AN/USQ-214(V)1, NETWORK TACTICAL COMMON DATA LINK (NTCDL) SYSTEM 0 - 1 8.363 RING LASER GYRO NAVIGATOR (RLGN) AN/WSN-12(V)1 0 - 1 9.325 MK 53 MOD 15 DECOY LAUNCHING SYSTEM 0 - 1 33.900 I-STALKER 0 - 1 P-35 Items Subtotal 156.998 7.500 253.548 Major Items AN/USQ-155(V)1 TACTICAL VARIANT SWITCH 1 INFORMATION ASSURANCE (IA) 2.265 1 2.150 2.950 2.233 AN/URC-154(V)1, MULTI-FUNCTION INFORMATION DISTRIBUTION SYSTEM (MIDS)-ON SHIP (MOS) 1 1.001 1 1.244 AN/SLQ-25E DUAL, SURFACE SHIP TORPEDO DEFENSE SYSTEM, NIXIE 1 7.919 1 7.187 SHIPBOARD AIR TRAFFIC CONTROL COMMUNICATIONS (SATCC) 1 1.932 1 2.888 AN/WSN-7(V)3, RING LASER GYRO NAVIGATOR (RLGN) 1 2.533 0 - DISTRIBUTED SYSTEMS DESIGN INTEGRATION SERVICES 1 7.221 1 19.549 C4I INTEGRATION & COORDINATION 9.614 8.272 DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) 1 1.268 0 - AN/USQ-144 AUTOMATED DIGITAL NETWORK SYSTEM (ADNS) 1 1.120 1 1.811 AN/UYQ-120(V)1 COMMAND & CONTROL PROCESSOR SYSTEM (C2PS) 1 0.890 1 1.230 LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 6 of 40 P-1 Line #3 Volume 1 - 48 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2013 Electronics Qty FY 2018 Total Cost (Each) Qty ($ M) OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER 1 ARC-210 CARRIER AIR TRAFFIC CONTROL CENTER (CATCC) - PRIFLY - LANDING SIGNAL OFFICER (LSO) SYSTEM 1 WARFARE SYSTEM INTEGRATION Total Cost (Each) ($ M) 1.910 0 1.488 1 2.001 13.823 22.462 COMMERCIAL BROADBAND SATELLITE PROGRAM, FORCE LEVEL VARIANT (CBSP-FLV) 2 2.239 2 AN/SSN-6(V)X BLOCK 4, NAVIGATION SENSOR SYSTEM INTERFACE (NAVSSI) 1 2.318 0 - GLOBAL POSITIONING SYSTEM, NAVIGATION, AND TIMING SERVICE (GPNTS) 0 - 1 2.262 INTEGRATED STRIKE PLANNING & EXECUTION SYSTEMS (ISP&E) 1 2.457 1 3.215 AN/USQ-123(V), COMMUNICATIONS DATA LINK-SYSTEM (CDL-S) 1 1.223 0 - AN/SPN-41 (V), INSTRUMENT LANDING SYSTEM (ILS) 1 3.356 1 3.928 SHIP SIGNAL EXPLOITATION SPACE (SSES/SI) COMMUNICATIONS 1 2.937 1 3.887 TURNKEY RADIO COMMUNICATIONS SYSTEM (RCS) 1 18.014 1 18.809 AN/USQ-T52 TRAINING INTERFACE UNIT (TIU) ADVANCED TRAINING DOMAIN (ATD) 1 1.225 1 1.831 AN/SPS-73(V)18 NEXT GENERATION SURFACE SEARCH RADAR (NGSSR) 0 - 1 3.424 READY ROOM (JSF) MODIFICATIONS 4.523 LITHIUM ION BATTERY HANDLING & STORAGE 1.009 3.430 7.900 2.300 OE-570G SATELLITE ANTENNA 0 - 1 1.115 ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM, NAVY (ECDIS-N) 0 - 1 2.283 I-STALKER 1 0.736 0 - ENVIRONMENTAL SATELLITE RECEIVER PROGRAM (ESRP) 0 - 1 4.003 DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) TACTICAL EDGE EQUIPMENT (DTEE) 0 - 1 Major Items Subtotal 2.351 95.171 132.565 Other Cost Elements Other ELECTRONICS 11.190 10.646 Other Cost Elements Subtotal 11.190 10.646 Total Electronics 263.359 396.759 Remarks: Configuration change of DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) to DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) TACTICAL EDGE EQUIPMENT (DTEE). LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 7 of 40 P-1 Line #3 Volume 1 - 49 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2013 Hull, Mechanical, and Electrical (HM&E) Qty (Each) FY 2018 Total Cost Qty ($ M) (Each) Total Cost ($ M) Major Items HM&E ENGINEERING SERVICES 23.996 16.494 LIFE RAFTS 2.334 2.068 SUPSHIP MATERIAL AND GFE 0.810 0.620 TRUCKS (FORKLIFTS) Major Items Subtotal - 0.825 27.140 20.007 Other Cost Elements 3.162 3.114 Other Cost Elements Subtotal Other HM&E 3.162 3.114 Total Hull, Mechanical, and Electrical (HM&E) 30.302 23.121 LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 8 of 40 P-1 Line #3 Volume 1 - 50 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2013 Ordnance Qty FY 2018 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) 1 678.468 1 AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) 1 79.278 1 71.759 ADVANCED ARRESTING GEAR (AAG) 1 260.243 1 385.090 PHALANX BLOCK 1B MK 15 MOD 21 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) 3 19.221 3 23.277 AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) 1 3.659 1 4.216 MK-57 NATO SEASPARROW MISSILE SYSTEM (NSSMS) 1 44.104 1 46.523 AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) 1 5.292 1 8.657 MK 49, MOD 5 ROLLING AIRFRAME MISSILE (RAM) 2 16.106 2 18.584 AN/SPQ-9B, ANTI-SHIP MISSILE DEFENSE (ASMD) SURFACE SURVEILLANCE AND TRACKING RADAR 1 7.595 1 8.656 IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) 0 - 1 8.837 INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) 0 - 1 5.523 UNMANNED AVIATION WARFARE CENTER (UAWC) 0 - 1 46.100 P-35 Items Subtotal 1,113.966 758.239 1,385.461 Major Items LANDING SIGNAL OFFICER DISPLAY SYSTEM (LSODS) 1 2.500 1 2.820 MORIAH BLOCK 2 1 1.079 1 1.972 LONG RANGE LINEUP SYSTEM (LRLS) 1 0.880 1 1.096 IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) 1 2.080 0 - INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) 1 5.128 0 - COMPACT SWAGING MACHINE (CSM) 2 2.442 2 2.677 JOINT STRIKE FIGHTER ALIS 1 2.310 1 1.995 MK-38 MOD 3 MACHINE GUN SYSTEM (MGS) 0 - 4 4.175 MANUALLY OPERATED VISUAL LANDING AID SYSTEM (MOVLAS) 0 - 1 1.693 COMMON MUNITIONS BUILT-IN-TEST(BIT)/REPROGRAMMING EQUIPMENT (CMBRE) - MAGAZINE OPERATIONS (MAGOPS) 0 - 1 Major Items Subtotal 16.419 4.214 20.642 Other Cost Elements DUAL BAND RADAR (DBR) (SPY-3 AND VOLUME SEARCH RADAR (VSR)) 10.810 - Other ORDNANCE 8.456 9.673 Other Cost Elements Subtotal Total Ordnance LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 9 of 40 19.266 9.673 1,149.651 1,415.776 P-1 Line #3 Volume 1 - 51 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Remarks: CVN 80 Ordnance: Total increase of $11.200M from the FY 2026 budget submission due to proper pricing of Enterprise Air Surveillance Radar (EASR). LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 10 of 40 P-1 Line #3 Volume 1 - 52 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CONSOLIDATED AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) PARM Code: PMW 160 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 12.305 ($ M) 1 15.121 Technical Data and Documentation 0.073 0.200 Spares 0.627 0.901 System Engineering 1.381 1.070 Technical Engineering Services 0.832 1.294 Other Costs 3.174 Total 1 4.123 18.392 1 22.709 Description: CANES will provide the Navy tactical/non-tactical information environment and infrastructure necessary to enable hosting, extended services reach-back and reach-forward, and relay functions. These capabilities will support real time and non-real time tactical/non-tactical edge connected, connectionless, and ad-hoc voice, video and data information exchange requirements. CANES replace and modernize afloat networks with hardware, software and enterprise services infrastructure to enable information warfare from and within the tactical domain. CANES provides complete infrastructure inclusive of hardware, software, processing, storage and end user devices for Unclassified, Coalition, Secret and Sensitive Compartmented Information (SCI) enclaves for all basic network services to Navy surface combatants, submarines and maritime operations centers. The POR CVN 79 is Increment 1.2 and CVN 80 is Increment 2.0. Contract Data: Quantity Unit Cost Mar 2017 1 12.305 Dec 2022 1 15.121 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 VARIOUS C/FFP FY 2018 CVN 80 VARIOUS C/CPFF New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 77 12 Required Award Date Oct 2019 FY 2018 CVN 80 Mar 2031 44 15 Apr 2026 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 11 of 40 P-1 Line #3 Volume 1 - 53 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) PARM Code: PEO IWS 6.0 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 4.024 ($ M) 1 4.944 Spares 0.840 0.910 System Engineering 0.777 0.464 Technical Engineering Services 0.728 0.716 Other Costs 0.984 Total 1 0.986 7.353 1 8.020 Description: The Cooperative Engagement Capability (CEC) AN/USG-2B system provides real time integration of fire control quality sensor data into a single composite data source, which is used by multiple CEC ships and airborne units for direct and remote missile engagements. CEC significantly improves battle force Anti-Air Warfare (AAW) capability by coordinating all force AAW sensors into a single real time, fire control quality composite track picture. Contract Data: Quantity Unit Cost May 2020 1 4.024 Jul 2022 1 4.944 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 DRS C/FFP FY 2018 CVN 80 DRS C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 47 18 Required Award Date Oct 2021 FY 2018 CVN 80 Mar 2031 30 18 Mar 2027 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 12 of 40 P-1 Line #3 Volume 1 - 54 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF PARM Code: PMW 170 SIGHT (EHF/VHF LOS) SAT FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 7.730 ($ M) 1 7.100 Ancillary Equipment 0.058 - Spares 0.110 0.055 System Engineering 0.152 0.259 Technical Engineering Services 0.269 0.371 Other Costs 0.517 Total 1 0.238 8.836 1 8.023 Description: DMR-VHF/UHF LOS/SATCOM is an open architecture system that allows transmission and reception of UHF and VHF RF signals. The DMR replaces many legacy systems, including some crypto, Line Of Sight (LOS) and Satellite Communications (SATCOM) components. Contract Data: Quantity Unit Cost Sep 2014 1 7.730 Feb 2019 1 7.100 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 GENERAL DYNAMICS C/FFP FY 2018 CVN 80 GENERAL DYNAMICS C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 71 18 Oct 2019 FY 2018 CVN 80 Mar 2031 38 18 Jul 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 13 of 40 P-1 Line #3 Volume 1 - 55 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII PARM Code: PMA 213 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 5.903 ($ M) 1 6.872 Ancillary Equipment 0.011 0.055 Technical Data and Documentation 0.004 0.019 Spares 0.114 0.530 System Engineering 0.121 0.051 Technical Engineering Services 0.633 0.182 Other Costs 0.302 Total 1 0.542 7.088 1 8.251 Description: IFF is an approved and fully supported centralized Mark XII/XIIA Interrogator system. It uses one receiver transmitter that synchronizes video with up to four radar sweeps. It supplies synthetic video (symbology) to, and accepts requests from, as many as 22 remote locations. It provides digital target reporting to the combat systems/weapon systems computer via full scan, sectored, and/or pop-up interrogations. It provides instantaneous target reporting at requested range and azimuth through the use of an electronically-steered Antenna Group OE-120/UPX or OE-120B/UPX. It provides electronically evaluated Mode 4 target reporting directly to operators and over the combat systems/weapon system computer interface. It provides full redundancy, so identification capabilities are retained in case of main processor, main antenna, or main receiver/transmitter failure. Contract Data: Quantity Unit Cost May 2016 1 5.903 Mar 2019 1 6.872 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 BAE SYSTEMS C/FFP FY 2018 CVN 80 NOTHROP GRUMMAN-BAE SYSTEMS SS/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 57 24 Jun 2020 FY 2018 CVN 80 Mar 2031 35 24 Apr 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 14 of 40 P-1 Line #3 Volume 1 - 56 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SPN-46, AUTOMATIC CARRIER LANDING SYSTEM PARM Code: PMA 213 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 7.389 ($ M) 1 11.737 System Engineering 0.239 0.387 Technical Engineering Services 0.246 0.430 Other Costs 0.111 Total 1 0.208 7.985 1 12.762 Description: AN/SPN-46 Automatic Carrier Landing System (ACLS) is a precision approach landing system (PALS) which provides electronic guidance to carrier-based aircraft and allows them to land in all-weather conditions with no limitations due to low ceiling or restricted visibility. AN/SPN-46 is a fully automated, all weather approach landing aid for carrier aircraft. Contract Data: Quantity Unit Cost Dec 2016 1 7.389 Dec 2020 1 11.737 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 NAWCAD Various FY 2018 CVN 80 NAWCAD Various New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 64 24 Nov 2019 FY 2018 CVN 80 Mar 2031 35 24 Apr 2026 Competition/Second Source Initiatives: None. Remarks: CVN 79 received a refurbished unit, while CVN 80 is getting a new unit due to lack of refurbished units available. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 15 of 40 P-1 Line #3 Volume 1 - 57 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SHIP SELF DEFENSE SYSTEM (SSDS) PARM Code: PEO IWS 10.0 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 11.135 ($ M) 1 18.900 Technical Data and Documentation 0.375 1.556 Spares 0.835 0.644 System Engineering 3.423 7.467 Technical Engineering Services 1.112 2.792 Other Costs 7.292 11.847 Total 1 24.172 1 43.206 Description: SSDS provides capabilities for multi-mission requirements including Ship Protection against air, surface, and subsurface threats using both own-ship and remote data (Joint Composite Track Number (JCTN) and Joint Data Network (JDN)) in support of the Anti-Air Warfare (AAW) Capstone requirements. Contract Data: Quantity Unit Cost Apr 2019 1 11.135 Jan 2020 1 18.900 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 LOCKHEED MARTIN C/FFP FY 2018 CVN 80 LOCKHEED MARTIN C/CPFF New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 51 24 Dec 2020 FY 2018 CVN 80 Mar 2031 31 24 Aug 2026 Competition/Second Source Initiatives: None Remarks: CVN 79 configuration has Mk 2, Mod (6E). CVN 80 configuration change from Mk 2, Mod (6E) to Mk 6, Mod X due to obsolescence issues. Hardware procurement supports the same Common Processing System (CPS)/Common Display System (CDS) configuration for SSDS, CV-TSC and SEWIP. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 16 of 40 P-1 Line #3 Volume 1 - 58 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SYY-1(V)1 AIR TRAFFIC CONTROL SYSTEM, SHIPBOARD PARM Code: PMA 213 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 2.863 ($ M) 1 3.057 Spares 0.221 0.068 System Engineering 0.552 0.571 Technical Engineering Services 0.238 0.730 Other Costs 0.308 Total 1 0.743 4.182 1 5.169 Description: AN/SYY-1(V)1 Air Traffic Control System, Shipboard is a processing and display system which correlates and fuses sensor inputs from radar and IFF. The correlated sensor data is displayed to Air Traffic Controllers in a 2D air picture to facilitate the safe and expeditious movement of air traffic operating in the carrier controlled area and launching from/recovering to the ship. Contract Data: Quantity Unit Cost Jan 2020 1 2.863 Nov 2022 1 3.057 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 VARIOUS Various FY 2018 CVN 80 VARIOUS Various New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 38 24 Jan 2022 FY 2018 CVN 80 Mar 2031 34 24 May 2026 Competition/Second Source Initiatives: N/A Remarks: This system replaces AN/TPX-42. AN/SYY-1(V)1 addresses obsolescence, incorporates existing AN/TPX-42A(V) functionality and will add additional capability and interfaces across all platforms. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 17 of 40 P-1 Line #3 Volume 1 - 59 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: NAVY MULTI-BAND TERMINAL (NMT) PARM Code: PMW 170 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 5.091 ($ M) 1 7.822 Ancillary Equipment 0.005 - Spares 0.305 0.263 System Engineering 0.042 0.060 Technical Engineering Services 0.040 0.087 Other Costs 0.296 Total 1 0.304 5.779 1 8.536 Description: The Advanced Extremely High Frequency (AEHF) Navy Multi-band Terminal (NMT) will be used to receive signals from the Advanced EHF satellites which is a follow-on to the DoW's highly secure, highly protected MILSTAR communications satellite system. Contract Data: Quantity Unit Cost Jun 2014 1 5.091 Jan 2020 1 7.822 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 RAYTHEON C/FFP FY 2018 CVN 80 RAYTHEON C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 71 18 Required Award Date Oct 2019 FY 2018 CVN 80 Mar 2031 31 18 Feb 2027 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 18 of 40 P-1 Line #3 Volume 1 - 60 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SLQ-32(V)6, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK PARM Code: PEO IWS 2E 2 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 10.117 ($ M) 1 11.100 Ancillary Equipment 0.195 Technical Data and Documentation 0.016 - Spares 0.341 0.267 System Engineering 0.969 0.980 Technical Engineering Services 1.323 0.168 Other Costs 0.800 Total 1 0.212 1.177 13.761 1 13.904 Description: SEWIP Block 2 is a scalable Electronic Warfare enterprise suite to provide improved Electromagnetic Interference (EMI) mitigation and Combat System Interface capabilities to select new construction ships as well as upgrade current AN/SLQ-32(V)3 and (V)4 Electronic Warfare (EW) suites on existing ships. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning and protection from anti-ship missiles. SEWIP Block 2 focused on Electronic Support (ES) capability improvements. Contract Data: Quantity Unit Cost Jan 2020 1 10.117 Jan 2020 1 11.100 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 LOCKHEED MARTIN C/FFP FY 2018 CVN 80 LOCKHEED MARTIN C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 37 18 Aug 2022 FY 2018 CVN 80 Mar 2031 24 18 Sep 2027 Competition/Second Source Initiatives: None Remarks: Hardware procurement supports the same CPS/CDS configuration for SSDS, CV-TSC and SEWIP. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 19 of 40 P-1 Line #3 Volume 1 - 61 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SSQ-130(V)8, SHIP'S SIGNAL EXPLOITATION EQUIPMENT INCREMENT F PARM Code: PMW 120 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 3.771 ($ M) 1 9.747 Spares 0.070 0.666 System Engineering 0.467 0.764 - 0.176 Technical Engineering Services Other Costs 0.548 Total 1 1.161 4.856 1 12.514 Description: SSEE Increment F provides a standardized Information Operations (IO) weapon system across multiple maritime platforms based on a common core capability which is responsive to emerging threats, promotes flexibility in the tasking of system assets, and supports the cross-training of personnel. SSEE Increment F provides the warfighter with a state-of-the-art, Net-Ready IO system which can be operated locally by personnel onboard the host platform, operated remotely by personnel not onboard the host platform, or operated in a combination of the two states. SSEE Increment F responds to emerging threats, promotes flexibility in tasking of system assets, supports cross-training personnel, maritime cyber capability, net ready IO system, remotable, and host architecture for Navy's IO strategies. Contract Data: Quantity Unit Cost Apr 2020 1 3.771 Mar 2023 1 9.747 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 VARIOUS Various FY 2018 CVN 80 VAROUS Various New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 42 18 Mar 2022 FY 2018 CVN 80 Mar 2031 35 18 Oct 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 20 of 40 P-1 Line #3 Volume 1 - 62 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SRC-66 (V)3 HFDAG PARM Code: PMW 170 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 4.528 ($ M) 1 4.553 Spares 0.280 0.010 System Engineering 0.164 0.207 Technical Engineering Services 0.179 0.396 Other Costs 0.231 Total 1 0.178 5.382 1 5.344 Description: High Frequency (HF) Distributed Amplifier Group (DAG) is the Navy's Program of Record (POR) HF system and is the follow-on replacement of HF Radio Group (HFRG). HFDAG has a modular architecture and utilizes COTS equipment to the maximum extent possible. It provides Line Of Sight (LOS/Beyond Line of Sight (BLOS) voice and data transmission capabilities to USN Ships. The 16-channel CVN variant greatly improves capabilities from HFRG: (1) increases availability (Ao), (2) provides reprogrammable waveforms, (3) increases the number of waveforms available, (4) provides automatic link establishment (ALE). Contract Data: Quantity Unit Cost Feb 2019 1 4.528 Feb 2019 1 4.553 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 GENERAL DYNAMICS C/FFP FY 2018 CVN 80 GENERAL DYNAMICS C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 61 18 Aug 2020 FY 2018 CVN 80 Mar 2031 35 18 Oct 2026 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 21 of 40 P-1 Line #3 Volume 1 - 63 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USN-3(V)1 SATELLITE SIGNAL LANDING SYSTEM (SSLS) PARM Code: PMA 213 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 9.162 ($ M) 0 - System Engineering 0.301 - Technical Engineering Services 0.099 - Other Costs 0.045 Total 1 - 9.607 0 - Description: AN/USN-3(V)1 Satellite Signal Landing System (SSLS) is the primary precision approach and landing system for CVN ships to support F-35B, F-35C, MQ-25 and future platforms. SSLS ship systems are required to provide a primary precision approach capability during night and instrument flight conditions and coupled approach to the deck (auto-land) capability aboard CVN ships. SSLS also provides over-theair inertial alignment capability for CVN ships to support aircraft platforms without Link-4A capability, including F-35, MQ-25 and future platforms. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 Raytheon C/FFP Nov 2021 New/Option Quantity Unit Cost 1 9.162 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 32 12 Jul 2023 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 22 of 40 P-1 Line #3 Volume 1 - 64 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (eCASS) PARM Code: PMA 260 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 39.423 Technical Engineering Services Total Cost (Each) ($ M) 1 39.504 1 39.900 0.182 Total 1 0.396 39.605 Description: The electronic Consolidated Automated Support System (eCASS) supports JSF integration on FORD Class. AN/USM-737(V) electronic Consolidated Automated Support System (eCASS) will be the Navy's next generation Automatic Test Equipment (ATE) system, replacing the legacy mainframe AN/USM-636(V) Consolidated Automated Support System (CASS) due to imminent obsolescence and emerging test requirements. eCASS will be the newest member of the CASS family of testers, designated by OPNAVINST 3960.16B as the US Navy's standard ATE used to perform avionics weapons system diagnostics and repair across a multitude of Naval and Marine Corps aircraft platforms and uses joint service coordinated test technologies that will be capable of interoperating with the Future Force. The eCASS system is designed with four configurations, with reserved design space allocations for future growth and mission peculiar requirements. The four eCASS configurations provide the capability to execute the Hybrid (HYB) Mission, Radio Frequency (RF) Mission, High Power (HP) Mission, and the Electro Optical (EO) Mission. Contract Data: Quantity Unit Cost Dec 2022 1 39.423 Sep 2023 1 39.504 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 LOCKHEED MARTIN SS/FFP FY 2018 CVN 80 LOCKHEED MARTIN SS/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 14 18 Required Award Date Jul 2024 FY 2018 CVN 80 Mar 2031 45 18 Dec 2025 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 23 of 40 P-1 Line #3 Volume 1 - 65 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER PARM Code: PMW 170 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 5.925 System Engineering - 0.066 Technical Engineering Services - 0.054 Other Costs - Total 0 0.077 - 1 6.122 Description: OA-9277 Description: Ultra High Frequency (UHF) Program supports the exchange of secure Battle Group coordination data, organizational messaging, tactical data and voice over UHF SATCOM via Demand Assigned Multiple Access (DAMA) over 5/25kHz channels. UHF legacy Communication Line of Sight (LOS) Systems also support Anti-Access/Area Denial (A2AD) by providing a redundant or overlapping form of communication in case U.S. satellites are targeted by threat nations. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 RF PRODUCTS INC C/FFP Aug 2021 New/Option Quantity Unit Cost 1 5.925 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 30 24 Sep 2026 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 24 of 40 P-1 Line #3 Volume 1 - 66 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USQ-214(V)1, NETWORK TACTICAL COMMON DATA LINK (NTCDL) SYSTEM PARM Code: PMW 170 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Qty ($ M) Major Hardware 0 Total Cost (Each) - ($ M) 1 6.396 Spares - 0.854 System Engineering - 0.250 Technical Engineering Services - 0.244 Other Costs - Total 0 0.619 - 1 8.363 Description: NTCDL provides the ability to transmit/receive real-time intelligence, surveillance, and reconnaissance (ISR) data simultaneously from multiple sources (air, surface, subsurface, and man-portable) and exchange command and control information (voice, data, imagery, and full-motion video) across dissimilar joint, service, coalition, and civil networks. NTCDL provides warfighters the capability to support multiple, simultaneous, networked operations with in-service CDL equipped aircraft (e.g., F/A-18, P-3, and MH- 60R) in addition to next-generation manned and unmanned platforms (e.g., P-8 Poseidon, Triton, Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) vehicle, Small Tactical Unmanned Aircraft Systems (STUAS), and Fire Scout). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 BAE Systems Information and Electronic Systems Integration Inc C/FFP Mar 2022 New/Option Quantity Unit Cost 1 6.396 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 31 14 Jun 2027 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 25 of 40 P-1 Line #3 Volume 1 - 67 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: RING LASER GYRO NAVIGATOR (RLGN) AN/WSN-12(V)1 PARM Code: PEO IWS 6.0 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 4.864 Technical Data and Documentation - 0.150 Spares - 0.600 System Engineering - 2.701 Technical Engineering Services - 0.233 Other Costs - Total 0 0.777 - 1 9.325 Description: The AN/WSN-12(V)1 Ring Laser Gyro Navigation (RLGN) System calculates and disseminates own ship's position, velocity and attitude (heading, roll and pitch) data outputs. The AN/WSN-12(V)1 RLGN System provides real time navigation data to use by Navigation & combat systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 Northrop Grumman C/FFP Mar 2023 New/Option Quantity Unit Cost 1 4.864 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 47 20 Aug 2025 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 26 of 40 P-1 Line #3 Volume 1 - 68 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 53 MOD 15 DECOY LAUNCHING SYSTEM PARM Code: PEO IWS 2D1 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) ($ M) - 1 12.084 Technical Data and Documentation - 0.069 Spares - 0.086 System Engineering - 2.042 Technical Engineering Services - 3.321 Other Costs - 16.298 Total 0 - 1 33.900 Description: The MK 53 MOD 15 decoy launching system is an integral part of the surface Electronic Warfare (EW) suite in the ship self-defense system. It provides protection against active Radio Frequency anti-ship missile attacks. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2018 CVN 80 Sechan C/FFP Mar 2023 New Quantity Unit Cost 1 12.084 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 30 30 Mar 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 27 of 40 P-1 Line #3 Volume 1 - 69 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: I-STALKER PARM Code: PEO IWS 2.0 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 4.199 Ancillary Equipment - 0.052 Spares - 0.149 System Engineering - 0.496 Technical Engineering Services - 1.769 Other Costs - Total 0 0.835 - 1 7.500 Description: I-Stalker provides a Long Range Narrow Field of View for threat identification and 24/7 man in the loop enhanced situational awareness for Bridge, Commanding Officer (CO), and Combat Information Center (CIC) watch bystanders by providing integration and control of stand-alone Electro Optic/Infrared (EO/IR) sensors via Situational Awareness System (SAwS) interface. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 TBD TBD Oct 2027 New/Option Quantity Unit Cost 1 4.199 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 24 17 Oct 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 79 is receiving a refurbished unit. CVN 80 is procuring a new unit as existing asset is unavailable for refurbishment. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 28 of 40 P-1 Line #3 Volume 1 - 70 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) PARM Code: PMA 251 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 611.307 1 653.837 Technical Data and Documentation 0.436 - Spares 5.656 37.930 System Engineering 21.666 22.835 Technical Engineering Services 2.587 0.291 Other Costs 36.816 43.346 Total 1 678.468 1 758.239 Description: EMALS is an advanced technology electrically generated launching system that uses a moving electromagnetic field to propel aircraft to launch speed. EMALS is made up of six primary sub-systems: prime power interface, energy storage, energy distribution, power conversion, launch motor, and launch control subsystem. Benefits over the current C13 steam catapults include reduced weight and volume, greater launching flexibility for future aircraft, improved control, and reduced manning workload requirements. Contract Data: Quantity Unit Cost New 1 611.307 Option 1 653.837 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2013 CVN 79 GENERAL ATOMICS SS/FFP May 2014 FY 2018 CVN 80 GENERAL ATOMICS SS/FFP Jan 2017 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 103 48 Aug 2014 FY 2018 CVN 80 Mar 2031 57 48 Jun 2022 Competition/Second Source Initiatives: None Remarks: Long Lead Time Materials Undefinitized Contract Action (UCA) awarded May 2014, Undefinitized Production UCA awarded June 2015 for CVN 79, and Production UCA definitized December 2016 for CVN 79 with option for CVN 80. CVN 80 option exercised January 2017 EMALS and AAG bundled savings on single production contract for CVN 79 and CVN 80 are reflective of contract negotiations. CVN 80 Spares P-35 category includes $28.05M for CVN 78 Class Interim Spares. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 29 of 40 P-1 Line #3 Volume 1 - 71 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) PARM Code: PEO IWS 2.0 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 44.937 ($ M) 1 38.804 Ancillary Equipment 0.539 0.056 Spares 4.682 1.140 System Engineering 7.714 9.105 Technical Engineering Services 11.811 14.094 Other Costs 9.595 Total 1 8.560 79.278 1 71.759 Description: The Enterprise Air Surveillance Radar (EASR) suite will be a modern long-range, three-dimensional (3D) radar used to search, detect and provide space-stabilized, three-coordinate (range, bearing, height) data for air intercept control and designation to a weapon system and Air Traffic Control (ATC) system. The Enterprise Radar Suite (ERS), which includes EASR, is intended to replace the functions that Dual Band Radar (DBR) performed on CVN 78, but at a much lower cost. Contract Data: Quantity Unit Cost Dec 2019 1 44.937 Mar 2022 1 38.804 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 RAYTHEON C/CPIF FY 2018 CVN 80 RAYTHEON C/CPIF New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 40 30 May 2021 FY 2018 CVN 80 Mar 2031 30 30 Mar 2026 Competition/Second Source Initiatives: None Remarks: The hardware configuration for the CVN 79, CVN 80, and CVN 81 (non-rotating) is essentially three times that of a rotating configuration, which is currently planned for the big deck amphibious warfare ships. CVN 79, CVN 80, and CVN 81 will have three phased arrays mounted around the island, while the amphibious warfare ships will use one rotating array. Below deck equipment is also provided at a larger scale with the non-rotating variant of EASR. The Enterprise Radar Suite (ERS) consists of AN/SPY-6(V)2 Enterprise Air Surveillance Radar (EASR), AN/SPQ-9B Anti-Ship Missile Defense (ASMD) Surface Surveillance and Tracking Radar, and MK-9 Target Illuminators (TIs) as part of MK-57 NATO SeaSparrow Missile System (NSSMS). CVN 80 - Increase from FY 26 budget submission due to proper pricing resulting from lessons learned from CVN 79, schedule changes and updated test events. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 30 of 40 P-1 Line #3 Volume 1 - 72 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ADVANCED ARRESTING GEAR (AAG) PARM Code: PMA 251 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 219.131 1 309.152 Spares 4.595 31.422 System Engineering 10.956 14.300 Technical Engineering Services 5.297 1.266 Other Costs 20.264 28.950 Total 1 260.243 1 385.090 Description: AAG provides an upgraded ability to recover all existing and projected aircraft carrier based air vehicles. The AAG system will replace the Mark 7 arresting gear system found on the NIMITZ class carriers and will be the aircraft recovery system for the CVN 79, CVN 80, and CVN 81. AAG consists of six primary systems: energy absorption subsystem, energy storage subsystem, dynamic control subsystem, thermal management subsystem, cross deck pendant, and the control subsystem. Contract Data: Quantity Unit Cost New 1 219.131 Option 1 309.152 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2013 CVN 79 GENERAL ATOMICS SS/FFP May 2014 FY 2018 CVN 80 GENERAL ATOMICS SS/FFP Jan 2017 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 101 48 Required Award Date Oct 2014 FY 2018 CVN 80 Mar 2031 61 48 Feb 2022 Competition/Second Source Initiatives: None Remarks: Long Lead Time Materials Undefinitized Contract Action (UCA) awarded May 2014, Undefinitized Production UCA awarded June 2015 for CVN 79, and Production UCA definitized December 2016 for CVN 79 with option for CVN 80. CVN 80 option exercised January 2017. EMALS and AAG bundled savings on single production contract for CVN 79 and CVN 80 are reflective of contract negotiations. CVN 80 Spares P-35 category includes $30.727M for CVN 78 Class Interim Spares and $1.770M for Initial Installation and Checkout Spares. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 31 of 40 P-1 Line #3 Volume 1 - 73 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: PHALANX BLOCK 1B MK 15 MOD 21 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) PARM Code: IWS 11 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 15.559 Ancillary Equipment Total Cost (Each) ($ M) 3 18.685 - 0.139 Spares 0.381 0.408 System Engineering 0.978 1.346 Technical Engineering Services 0.797 0.895 Other Costs 1.506 Total 3 1.804 19.221 3 23.277 Description: Phalanx is a high fire rate Close-In Weapon System (CIWS) that automatically acquires, tracks and destroys Anti-Ship cruise missiles, Helos, Aircraft, and all types of Surface threats. The installed version will have one MK-15 Mod 21 and two MK-15 Mod 22 CIWS systems. Contract Data: Quantity Unit Cost Mar 2020 3 5.186 Mar 2023 3 6.228 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 RAYTHEON C/FFP FY 2018 CVN 80 RAYTHEON C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 49 22 Required Award Date Apr 2021 FY 2018 CVN 80 Mar 2031 28 22 Jan 2027 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 32 of 40 P-1 Line #3 Volume 1 - 74 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) PARM Code: PEO IWS 5E FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 2.743 ($ M) 1 3.278 Technical Data and Documentation 0.012 - Spares 0.114 0.260 System Engineering 0.206 0.031 Technical Engineering Services 0.105 - Other Costs 0.479 0.647 Total 1 3.659 1 4.216 Description: CV-TSC provides for carrier organic Anti-submarine Warfare (ASW), Mine Warfare (MIW), Surface Warfare (SUW), and other composite warfare area sensor data processing, tactical command and control, and organic/battle-group aircraft mission support. CV-TSC supports both ship self defense and embarked Destroyer Squadron (DESRON) missions. This system is Open Architecture Computing Environment (OACE), Joint Fires Network (JFN), and FORCEnet compliant, and includes redesign to maximize introduction of expected transformational technologies such as Common Processing System (CPS), Common Display System (CDS), sensor processing in support of the MH-60R helicopter, high speed bandwidth network, Excomm systems, net-centric warfare components, etc. Contract Data: Quantity Unit Cost Jan 2020 1 2.743 Jan 2020 1 3.278 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 Various Various FY 2018 CVN 80 Various Various New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 51 18 Jun 2021 FY 2018 CVN 80 Mar 2031 35 18 Oct 2026 Competition/Second Source Initiatives: None Remarks: Hardware procurement supports the same Common Processing System (CPS)/Common Display System (CDS) configuration for SSDS, CV-TSC and SEWIP. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 33 of 40 P-1 Line #3 Volume 1 - 75 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK-57 NATO SEASPARROW MISSILE SYSTEM (NSSMS) PARM Code: PEO IWS 12 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 39.607 ($ M) 1 40.644 Ancillary Equipment 0.269 0.435 Spares 1.329 1.958 System Engineering 0.736 0.816 Technical Engineering Services 0.421 0.773 Other Costs 1.742 Total 1 1.897 44.104 1 46.523 Description: The NATO SeaSparrow Surface Missile System (NSSMS) is a medium range self-defense missile system capable of defeating near/mid-term air/surface threats. The NSSMS MK 57 is comprised of (4) MK 9 tracker/illuminator radars and (2) MK 29 ESSM Guided Missile Launchers (GML) that connect to and support the SSDS Integrated Combat System (ICS). Contract Data: Quantity Unit Cost Nov 2019 1 39.607 Mar 2023 1 40.644 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 RAYTHEON C/FFP FY 2018 CVN 80 RAYTHEON C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 41 29 May 2021 FY 2018 CVN 80 Mar 2031 18 36 Sep 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 34 of 40 P-1 Line #3 Volume 1 - 76 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) PARM Code: PMA 251 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 2.739 Spares 1 2.854 - 0.471 System Engineering 0.373 0.378 Technical Engineering Services 1.053 0.825 Other Costs 1.127 Total 1 4.129 5.292 1 8.657 Description: ADMACS is a virtual, seamless, data sharing, knowledge based data system that provides interface for all aviation data systems. It is a tactical real-time information management system maintaining data integrity throughout the ship spaces that manage aircraft launch and recovery operations on board the carrier. ADMACS includes data from launch and recovery equipment, air traffic control, aviation maintenance, landing signaling officer, etc. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2013 CVN 79 BOWHEAD C/FFP Jul 2016 Option FY 2018 CVN 80 Laurel Technologies Partnership/DRS Various Sep 2022 Quantity Unit Cost 1 2.739 1 2.854 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 69 12 Required Award Date Jun 2020 FY 2018 CVN 80 Mar 2031 28 12 Nov 2027 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 35 of 40 P-1 Line #3 Volume 1 - 77 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 49, MOD 5 ROLLING AIRFRAME MISSILE (RAM) PARM Code: PEO IWS 11 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) 12.184 ($ M) 2 15.385 Ancillary Equipment 0.013 Technical Data and Documentation 0.073 - - 0.134 System Engineering 2.233 1.102 Technical Engineering Services 0.397 0.231 Other Costs 1.206 Spares Total 2 0.400 1.332 16.106 2 18.584 Description: The MK 49 Mod 5 Rolling Airframe Missile (RAM) Weapon System is a lightweight, low cost, high power system for anti-ship missile defense against current and evolving threats. The Block 2 upgrade adds the capability of infrared, all-the-way missile guidance while maintaining the original dual-mode (RF/IR) capability. The helos, aircraft, and surface (HAS) upgrade enable the engagement of asymmetric threats. Contract Data: Quantity Unit Cost Jun 2019 2 6.092 Jun 2023 2 7.693 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 RAYTHEON C/FFP FY 2018 CVN 80 RAYTHEON C/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2013 CVN 79 Mar 2027 48 21 Required Award Date Jun 2021 FY 2018 CVN 80 Mar 2031 33 21 Sep 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 36 of 40 P-1 Line #3 Volume 1 - 78 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPQ-9B, ANTI-SHIP MISSILE DEFENSE (ASMD) SURFACE SURVEILLANCE AND TRACKING RADAR PARM Code: PEO IWS2B FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 4.505 ($ M) 1 4.883 Spares 0.634 0.221 System Engineering 0.524 1.315 Technical Engineering Services 0.589 0.764 Other Costs 1.343 Total 1 1.473 7.595 1 8.656 Description: SPQ-9B is a multimode, x-band, narrow beam, pulse Doppler radar that detects and tracks sea-skimming missiles (ASMD) at the horizon in heavy clutter while simultaneously providing detection and tracking of surface targets. Contract Data: Quantity Unit Cost Mar 2020 1 4.505 Mar 2022 1 4.883 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2013 CVN 79 LAUREL TECHNOLOGIES PARTNERSHIP SS/FFP FY 2018 CVN 80 NGES SS/FFP New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2013 CVN 79 Mar 2027 41 18 Apr 2022 FY 2018 CVN 80 Mar 2031 35 18 Oct 2026 Competition/Second Source Initiatives: None Remarks: The Enterprise Radar Suite (ERS) consists of AN/SPY-6(V)3 Enterprise Air Surveillance Radar (EASR), AN/SPQ-9B Anti-ship Missile Defense (ASMD) Surface Surveillance and Tracking Radar and MK-9 Target Illuminators (TIs) as part of MK-57 Nato SeaSparrow Missile System (NSSMS). LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 37 of 40 P-1 Line #3 Volume 1 - 79 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) PARM Code: PMA 251 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 8.115 System Engineering - 0.204 Technical Engineering Services - 0.045 Other Costs - Total 0 0.473 - 1 8.837 Description: Improved Fresnel Lens Optical Landing System (IFLOLS) is the primary visual landing aid system that displays glide path and trend information to a fixed wing pilot approaching the CVN flight deck. The system presents a display that is visible at a range of 1.0 nautical mile and displays a virtual image (ball) that is dynamically stabilized to compensate for ship's pitch, roll and heave motion. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 NAWCAD WR Feb 2022 New/Option Quantity Unit Cost 1 8.115 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 49 12 Feb 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 38 of 40 P-1 Line #3 Volume 1 - 80 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) PARM Code: PMA 251 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 3.145 Spares - 0.397 System Engineering - 0.291 Technical Engineering Services - 0.730 Other Costs - Total 0 0.960 - 1 5.523 Description: ILARTS provides a method for observing and retaining a video record of each aircraft launch and recovery. The system simultaneously monitors and records aircraft recoveries and launches during day and night operations. It also provides the LSO with information on the aircraft lineup during recovery. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2018 CVN 80 Various Various Nov 2022 New/Option Quantity Unit Cost 1 3.145 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 49 12 Feb 2026 Competition/Second Source Initiatives: None LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 39 of 40 P-1 Line #3 Volume 1 - 81 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: UNMANNED AVIATION WARFARE CENTER (UAWC) PARM Code: PMA 268 FY 2013 FY 2018 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) ($ M) - Technical Engineering Services 1 32.500 - Total 0 13.600 - 1 46.100 Description: The Unmanned Aviation Warfare Center (UAWC) will be the location from which the Air Vehicle Pilots (AVPs) control the MQ-25 unmanned aircraft using existing carrier communication systems and networks. MQ-25 payload sensor data will also be distributed throughout the carrier from the UAWC. The control station, also called the MD-5, consists of the following components: the Multi-Domain Control Capability (MDCX) which will be 7-9 AVP consoles and 3-4 server racks, the Video Management System (VidMS) and Air Traffic Control (ATC) picture for situational awareness, the Unmanned Carrier Aviation Transport System (UTS) for integration with ship networks and generation of the mission plan for the MQ-25, the ARC-210 Radio Communication System (RCS), the Digital Modular Radio (DMR), and the integrated communication system half-rack that allows AVPs access to existing ship radios. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2018 CVN 80 Lockheed Martin TBD Jan 2026 New Quantity Unit Cost 1 32.500 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2018 CVN 80 Mar 2031 20 24 Jul 2027 Competition/Second Source Initiatives: N/A LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 40 of 40 P-1 Line #3 Volume 1 - 82 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 First System (2027) Award Date: March 2030 First System (2027) Completion Date: March 2039 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) CVN 82 Basic (1) Propulsion Equipment Ordnance (2) (3) 40-101 Various - 336.112 554.089 611.304 - - - 36-108 Various - 273.500 1,343.200 1,623.679 - - - 36-40 Various - 2.426 43.277 58.817 - - - - 612.038 1,940.566 2,293.800 - - - 448.666 Total: CVN 82 CVN 83 Basic - - - - 0.000 Propulsion Equipment - - - - 0.000 - - - 348.242 Ordnance - - - - 0.000 23.614 48.705 48.068 148.247 Total: CVN 83 - - - 472.280 1,514.105 1,121.344 780.571 Total Advance Procurement/Obligation Authority - 2,766.080 1,514.105 1,121.344 780.571 612.038 1,940.566 1,465.400 1,073.276 284.082 *Note: "When Required" is the number of months required before ship delivery. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 1 of 2 P-1 Line #4 Volume 1 - 83 === page 134 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 2001 / Carrier Replacement Program Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) CVN 82 Basic (1) Propulsion Equipment Ordnance (2) (3) 40-101 Various - Oct 2026 - 2029 554.089 36-108 Various - Oct 2026 - 2029 1,343.200 36-40 Various - Oct 2026 - 2029 Total: CVN 82 43.277 1,940.566 CVN 83 Basic - - - - 0.000 Propulsion Equipment - - - - 0.000 Ordnance - - - - 0.000 Total: CVN 83 - Total Advance Procurement/Obligation Authority 1,940.566 Description: Basic: Funding is required for procurement of the longest lead non-reactor propulsion plant, electric plant contractor furnished equipment and shipbuilder advance procurement / construction efforts necessary to support an efficient CVN 82 construction schedule. Advance Construction (AC) / Advance Procurement (AP) efforts are to de-risk the construction schedule and improve probability of on-time delivery. AP items include Castings & Forgings, Engine Room Equipment (Main Turbine Generators, Main Reduction Gears, High/Low Pressure Turbines, Condensers, Air Conditioning plants and Bulkhead Penetrations) Valves & Fittings, and Pumps & Motors. AC begins construction activities in key areas to gain schedule margin and reduce controlling path risks. Without the AP/AC efforts the construction schedules are not supported. This enables level loading of resources and will provide needed schedule execution to mitigate the risk of supporting the shipbuilder construction schedules. Funding supports aircraft carrier construction, supports the industrial base, reduces risk of construction schedule delays and cost growth, thereby ensuring nation's operational requirements for aircraft carriers are met. Propulsion Equipment: Funding is required to fund the longest lead reactor plant components and meet shipbuilder required-in-yard dates in support of Advance Construction (AC) and production of CVN 82. The complexity, size and early shipyard need dates for reactor plant equipment make them among the longest lead items for CVN 82 to ensure an efficient construction schedule. Ordnance: Funding is required to support Electromagnetic Aircraft Launching System (EMALS)/Advanced Arresting Gear (AAG) for CVN 82. *Note: "When Required" is the number of months required before ship delivery. Footnotes: (1) (2) (3) Increase in FY27 is for additional LLTM to support the current construction schedule. FY26 AP funding was for initial material acquisition and support the industrial base, but the procurement of complex propulsion systems requires an increased investment in FY27. FY27 increase is to award the production contract for EMALS/AAG. LI 2001 - Carrier Replacement Program Navy UNCLASSIFIED Page 2 of 2 P-1 Line #4 Volume 1 - 84 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2004 / CVN-81 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 223 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1 15,615.934 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 15,615.934 Total Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - 0.000 Less Cost To Complete ($ in Millions) - - - - - - - - - - - 0.000 13,758.434 - - - - - - - - - - 13,758.434 1,429.682 - - - - - - - - - - 1,429.682 427.818 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 427.818 4,746.667 674.930 1,622.935 1,447.882 - 1,447.882 1,636.373 1,414.592 2,215.055 - - 13,758.434 5,174.485 674.930 1,622.935 1,447.882 - 1,447.882 1,636.373 1,414.592 2,215.055 Less Subsequent Year Full Funding ($ in Millions) Less Funding in SCN Line Item 2001 ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) - - 14,186.252 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - 0.000 Plus Cost To Complete ($ in Millions) - - - - - - - - - - - 0.000 - - - - - - - - - - 1,429.682 2,215.055 0.000 - 15,615.934 62.233 84.458 76.245 379.908 602.844 1,476.825 2,299.513 76.245 379.908 16,218.778 Plus Funding in SCN Line Item 2001 ($ in Millions) Total Obligation Authority ($ in Millions) 1,429.682 6,604.167 674.930 1,622.935 1,447.882 0.000 1,447.882 1,636.373 1,414.592 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) - Total ($ in Millions) 6,604.167 Gross/Weapon System Unit Cost ($ in Millions) 15,615.934 674.930 - 1,622.935 - - - 1,447.882 - - 1,447.882 - - 1,636.373 - - - - - 15,615.934 Description: To provide credible, sustainable, independent forward presence during peacetime without access to land bases; operate as the cornerstone of a joint and/or allied maritime expeditionary force in response to crisis; and carry the war to the enemy through joint multi-mission offensive operations. The Navy designed the FORD Class aircraft carrier with the warfighting capability essential for the 21st century, and the flexibility and resilience to rapidly adapt to emerging threats. The Ford class incorporates advances in technology such as a new reactor plant, propulsion system, electric plant, Electromagnetic Aircraft Launch System (EMALS), Advanced Arresting Gear (AAG), machinery control, and integrated warfare systems that increase lethality, while lowering life cycle costs through reductions in maintenance and manning requirements. Increased Service Life Allowances (SLA) for weight and stability enable future modernization and the ability to adapt to new missions over the ship's 50-year life cycle. CVN 80 and CVN 81 were awarded under a two-ship buy. CVN 81 is a separate contract line item under the same contract as CVN 80, which allows discrete hull costs to be captured. The CVN 80/81 construction contract is a Fixed Price Incentive (Firm Target) (FPIF) contract type that limits the Navy's liability and incentivizes the shipyard's best performance. The contract language guarantees a single technical baseline for both ships, which allows the shipyard to re-use engineering rollover products, minimize changes between the two ships and leverages economic order quantities for equipment and material procurement. LI 2004 - CVN-81 Navy UNCLASSIFIED Page 1 of 37 P-1 Line #5 Volume 1 - 85 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2004 / CVN-81 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 223 Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Systems: 1092 ft 134 ft 97,337 TONS 38.7 ft Electronics -SHIP SELF DEFENSE SYSTEM (SSDS) CVN 81 Ordnance -ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) -AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) -ADVANCED ARRESTING GEAR (AAG) (1) Jan 2019 181 months 181 months Feb 2034 Sep 2034 Aug 2035 Design Schedule Start / Issue Complete / Response Issue Date for TLR Apr 2004 N/A Issue Date for TLS Sep 2006 N/A Preliminary Design Jan 2003 Jul 2008 Contract Design May 2004 Apr 2008 Detail Design Jan 2004 Sep 2009 Request for Proposals Jul 2007 Oct 2007 Design Agent Huntington Ingalls Industries Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C BUDGET ESTIMATE Footnotes: (1) The CVN 81 delivery date shifted from February 2032 to February 2034 due to shipbuilder construction footprint constraints limiting their ability to build CVN 81 ship modules. LI 2004 - CVN-81 Navy UNCLASSIFIED Page 2 of 37 P-1 Line #5 Volume 1 - 86 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) P-1 Line Item Number / Title: 2004 / CVN-81 FY 2020 Cost Categories Qty indicates the presence of a P-8a Plan Costs 9,694.510 Change Orders 246.209 (†) 564.557 Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance ($ M) 1 Basic Construction/Conversion Electronics Total Cost (Each) 2,887.110 (†) 15.256 (†) 2,073.200 Other Cost 135.092 Total Ship Estimate 15,615.934 Less Subsequent Full Funding FY 2021 1,606.432 Less Subsequent Full Funding FY 2022 1,287.719 Less Subsequent Full Funding FY 2023 1,052.024 Less Subsequent Full Funding FY 2024 800.492 Less Subsequent Full Funding FY 2025 674.930 Less Subsequent Full Funding FY 2026 1,622.935 Less Subsequent Full Funding FY 2027 1,447.882 Less Subsequent Full Funding FY 2028 1,636.373 Less Subsequent Full Funding FY 2029 1,414.592 Less Subsequent Full Funding FY 2030 2,215.055 Less Funding in SCN Line Item 2001 FY 2019 643.000 Less Funding in SCN Line Item 2001 FY 2020 786.682 Net P-1 Funding 427.818 Remarks: Basic Construction: Increase of $405.315M from the FY 2026 budget submission due to an increase in economic price adjustment, pier upgrades to support outfitting and test of more than one Ford Class Carrier during construction after launch from dry dock, government production engineering and waterfront construction support, incorporate obsolescence and fact of life changes into the pre delivery construction period providing the fleet a more capable asset at delivery and addresses revised requirements for nuclear shipyard firefighting enhancements. LI 2004 - CVN-81 Navy UNCLASSIFIED Page 3 of 37 P-1 Line #5 Volume 1 - 87 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship CVN 81 (1) Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date Huntington Ingalls Industries, Newport News Shipbuilding 2020 Jan 2019 Jan 2019 Feb 2034 Footnotes: (1) The CVN 81 delivery date shifted from February 2032 to February 2034 due to shipbuilder construction footprint constraints limiting their ability to build CVN 81 ship modules. LI 2004 - CVN-81 Navy UNCLASSIFIED Page 4 of 37 P-1 Line #5 Volume 1 - 88 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Qty Electronics Total Cost (Each) ($ M) P-35 Items CONSOLIDATED AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) 1 28.122 AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) 1 8.695 DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF SIGHT (EHF/VHF LOS) SAT 1 10.146 AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII 1 8.912 SPN-46, AUTOMATIC CARRIER LANDING SYSTEM 1 14.549 SHIP SELF DEFENSE SYSTEM (SSDS) 1 40.499 AN/SYY-1(V)1 AIR TRAFFIC CONTROL SYSTEM, SHIPBOARD 1 5.521 NAVY MULTI-BAND TERMINAL (NMT) 1 31.556 AN/SLQ-32(V)7, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 1 163.100 SPECTRAL 1 19.101 AN/SRC-66(V)3 HFDAG 1 7.067 AN/USN-3(V)1 SATELLITE SIGNAL LANDING SYSTEM (SSLS) 1 13.482 OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER 1 8.232 AN/WSN-12(V)1, RING LASER GYRO NAVIGATOR (RLGN) 1 8.076 AN/USQ-214(V)1, NETWORK TACTICAL COMMON DATA LINK (NTCDL) SYSTEM 1 8.426 MK 53 MOD 15 DECOY LAUNCHING SYSTEM (DLS) 1 20.000 I-STALKER 1 P-35 Items Subtotal 7.500 402.984 Major Items AN/USQ-155(V)1 TACTICAL VARIANT SWITCH 1 INFORMATION ASSURANCE (IA) 3.597 2.626 AN/URC-141X, MULTI-FUNCTION INFORMATION DISTRIBUTION SYSTEM (MIDS)-ON SHIP (MOS) 1 1.747 AN/SLQ-25E DUAL, SURFACE SHIP TORPEDO DEFENSE SYSTEM, NIXIE 1 7.779 SHIPBOARD AIR TRAFFIC CONTROL COMMUNICATIONS (SATCC) 1 3.469 DISTRIBUTED SYSTEMS DESIGN INTEGRATION SERVICES 1 21.186 C4I INTEGRATION & COORDINATION 8.657 DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) TACTICAL EDGE EQUIPMENT (DTEE) 1 2.634 AN/USQ-144M(V)2 AUTOMATED DIGITAL NETWORK SYSTEM (ADNS) 1 2.027 AN/UYQ-131 COMMAND & CONTROL PROCESSOR SYSTEM (C2P MOD) 1 1.536 ARC-210 CARRIER AIR TRAFFIC CONTROL CENTER (CATCC) - PRIFLY - LANDING SIGNAL OFFICER (LSO) SYSTEM 1 WARFARE SYSTEM INTEGRATION COMMERCIAL BROADBAND SATELLITE PROGRAM, FORCE LEVEL VARIANT (CBSP-FLV) LI 2004 - CVN-81 Navy 2.514 26.795 2 UNCLASSIFIED Page 5 of 37 P-1 Line #5 4.771 Volume 1 - 89 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2004 / CVN-81 FY 2020 Qty Electronics Total Cost (Each) ($ M) GLOBAL POSITIONING SYSTEM, NAVIGATION, AND TIMING SERVICE (GPNTS) 1 2.727 INTEGRATED STRIKE PLANNING & EXECUTION SYSTEMS (ISP&E) 1 3.478 AN/SPN-41 (V), INSTRUMENT LANDING SYSTEM (ILS) 1 4.689 SHIP SIGNAL EXPLOITATION SPACE (SSES/SI) COMMUNICATIONS 1 4.210 TURNKEY RADIO COMMUNICATIONS SYSTEM (RCS) 1 21.081 AN/USQ-T52 TRAINING INTERFACE UNIT (TIU) ADVANCED TRAINING DOMAIN (ATD) 1 1.491 AN/SPS-73(V)18 NEXT GENERATION SURFACE SEARCH RADAR (NGSSR) 1 3.516 READY ROOM (JSF) 1 7.900 LITHIUM ION BATTERY HANDLING & STORAGE 2.400 OE-570G SATELLITE ANTENNA 1 1.204 ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM, NAVY (ECDIS-N) 1 2.077 ENVIRONMENTAL SATELLITE RECEIVER PROGRAM (ESRP) 1 Major Items Subtotal 4.347 148.458 Other Cost Elements Other ELECTRONICS 13.115 Other Cost Elements Subtotal 13.115 Total Electronics 564.557 Remarks: LI 2004 - CVN-81 Navy UNCLASSIFIED Page 6 of 37 P-1 Line #5 Volume 1 - 90 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2004 / CVN-81 FY 2020 Qty Hull, Mechanical, and Electrical (HM&E) (Each) Total Cost ($ M) Major Items HM&E ENGINEERING SERVICES 8.093 LIFE RAFTS 2.130 SUPSHIP MATERIAL AND GFE 0.616 TRUCKS (FORKLIFTS) 0.820 Major Items Subtotal 11.659 Other Cost Elements Other HM&E 3.597 Other Cost Elements Subtotal 3.597 Total Hull, Mechanical, and Electrical (HM&E) 15.256 Remarks: LI 2004 - CVN-81 Navy UNCLASSIFIED Page 7 of 37 P-1 Line #5 Volume 1 - 91 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Qty Ordnance Total Cost (Each) ($ M) P-35 Items ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) 1 AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) 1 75.378 ADVANCED ARRESTING GEAR (AAG) 1 596.110 PHALANX BLOCK 1B MK 15 MOD 21 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) 3 28.343 AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) 1 3.684 MK-57 NATO SEASPARROW MISSILE SYSTEM (NSSMS) 1 45.849 AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) 1 8.772 MK 49, MOD 3 ROLLING AIRFRAME MISSILE (RAM) 2 22.490 AN/SPQ-9B, ANTI-SHIP MISSILE DEFENSE (ASMD) SURFACE SURVEILLANCE AND TRACKING RADAR 1 8.775 IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) 1 9.954 INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) 1 6.396 UNMANNED AVIATION WARFARE CENTER (UAWC) 1 46.115 P-35 Items Subtotal 1,191.529 2,043.395 Major Items LANDING SIGNAL OFFICER DISPLAY SYSTEM (LSODS) 1 3.056 MORIAH BLOCK 2 1 2.013 LONG RANGE LINEUP SYSTEM (LRLS) 1 1.074 COMPACT SWAGING MACHINE (CSM) 2 1.635 JOINT STRIKE FIGHTER ALIS 1 1.995 MK-38 MOD 3 MACHINE GUN SYSTEM (MGS) 4 4.417 MANUALLY OPERATED VISUAL LANDING AID SYSTEM (MOVLAS) 1 1.849 COMMON MUNITIONS BUILT-IN-TEST(BIT)/REPROGRAMMING EQUIPMENT (CMBRE) - MAGAZINE OPERATIONS (MAGOPS) 1 Major Items Subtotal 4.600 20.639 Other Cost Elements Other ORDNANCE 9.166 Other Cost Elements Subtotal 9.166 Total Ordnance LI 2004 - CVN-81 Navy 2,073.200 UNCLASSIFIED Page 8 of 37 P-1 Line #5 Volume 1 - 92 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CONSOLIDATED AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) PARM Code: PMW 160 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 17.519 Technical Data and Documentation 0.451 Spares 0.976 System Engineering 2.103 Technical Engineering Services 1.468 Other Costs 5.605 Total 1 28.122 Description: CANES will provide the Navy tactical/non-tactical information environment and infrastructure necessary to enable hosting, extended services reach-back and reach-forward, and relay functions. These capabilities will support real time and non-real time tactical/non-tactical edge connected, connectionless, and ad-hoc voice, video and data information exchange requirements. CANES replace and modernize afloat networks with hardware, software and enterprise services infrastructure to enable information warfare from and within the tactical domain. CANES provides complete infrastructure inclusive of hardware, software, processing, storage and end user devices for Unclassified, Coalition, Secret and Sensitive Compartmented Information (SCI) enclaves for all basic network services to Navy surface combatants, submarines and maritime operations centers. The POR is Increment 2.0. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 VARIOUS C/FFP Mar 2027 New/Option Quantity Unit Cost 1 17.519 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 44 15 Mar 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 9 of 37 P-1 Line #5 Volume 1 - 93 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) PARM Code: PEO IWS 6.0 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 5.847 Spares 0.500 System Engineering 0.520 Technical Engineering Services 0.734 Other Costs 1.094 Total 1 8.695 Description: The Cooperative Engagement Capability (CEC) AN/USG-2B system provides real time integration of fire control quality sensor data into a single composite data source, which is used by multiple CEC ships and airborne units for direct and remote missile engagements. CEC significantly improves battle force Anti-Air Warfare (AAW) capability by coordinating all force AAW sensors into a single real time, fire control quality composite track picture. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Raytheon C/FFP Sep 2024 New/Option Quantity Unit Cost 1 5.847 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 30 18 Feb 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 10 of 37 P-1 Line #5 Volume 1 - 94 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF PARM Code: PMW 170 SIGHT (EHF/VHF LOS) SAT FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 8.787 Spares 0.060 System Engineering 0.528 Technical Engineering Services 0.442 Other Costs 0.329 Total 1 10.146 Description: DMR-VHF/UHF LOS/SATCOM is an open architecture system that allows transmission and reception of UHF and VHF RF signals. The DMR replaces many legacy systems, including some crypto, Line Of Sight (LOS) and Satellite Communications (SATCOM) components. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 General Dynamics Mission Systems C/FFP Mar 2024 New/Option Quantity Unit Cost 1 8.787 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 39 18 May 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 11 of 37 P-1 Line #5 Volume 1 - 95 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII PARM Code: PMA 213 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 7.382 Ancillary Equipment 0.096 Technical Data and Documentation 0.021 Spares 0.310 System Engineering 0.241 Technical Engineering Services 0.203 Other Costs 0.659 Total 1 8.912 Description: IFF is an approved and fully supported centralized Mark XII/XIIA Interrogator system. It uses one receiver transmitter that synchronizes video with up to four radar sweeps. It supplies synthetic video (symbology) to, and accepts requests from, as many as 22 remote locations. It provides digital target reporting to the combat systems/weapon systems computer via full scan, sectored, and/or pop-up interrogations. It provides instantaneous target reporting at requested range and azimuth through the use of an electronically-steered Antenna Group OE-120/UPX or OE-120B/UPX. It provides electronically evaluated Mode 4 target reporting directly to operators and over the combat systems/weapon system computer interface. It provides full redundancy, so identification capabilities are retained in case of main processor, main antenna, or main receiver/transmitter failure. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NOTHROP GRUMMAN-BAE SYSTEMS SS/FFP Mar 2022 New/Option Quantity Unit Cost 1 7.382 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 24 Mar 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 12 of 37 P-1 Line #5 Volume 1 - 96 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SPN-46, AUTOMATIC CARRIER LANDING SYSTEM PARM Code: PMA 213 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 12.949 System Engineering 0.520 Technical Engineering Services 0.640 Other Costs 0.440 Total 1 14.549 Description: AN/SPN-46 Automatic Carrier Landing System (ACLS) is a precision approach landing system (PALS) which provides electronic guidance to carrier-based aircraft and allows them to land in all-weather conditions with no limitations due to low ceiling or restricted visibility. AN/SPN-46 is a fully automated, all weather approach landing aid for carrier aircraft. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NAWCAD Various Mar 2025 New/Option Quantity Unit Cost 1 12.949 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 24 Mar 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 13 of 37 P-1 Line #5 Volume 1 - 97 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SHIP SELF DEFENSE SYSTEM (SSDS) PARM Code: PEO IWS 10.0 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 15.232 Technical Data and Documentation 0.685 Spares 0.523 System Engineering 4.529 Technical Engineering Services 1.731 Other Costs 17.799 Total 1 40.499 Description: SSDS provides capabilities for multi-mission requirements including Ship Protection against air, surface, and subsurface threats using both own-ship and remote data (Joint Composite Track Number (JCTN) and Joint Data Network (JDN)) in support of the Anti-Air Warfare (AAW) Capstone requirements. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Lockheed Martin TBD Jul 2027 New/Option Quantity Unit Cost 1 15.232 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 31 24 Jul 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 14 of 37 P-1 Line #5 Volume 1 - 98 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SYY-1(V)1 AIR TRAFFIC CONTROL SYSTEM, SHIPBOARD PARM Code: PMA 213 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 3.168 Spares 0.072 System Engineering 0.619 Technical Engineering Services 0.743 Other Costs 0.919 Total 1 5.521 Description: AN/SYY-1(V)1 Air Traffic Control System, Shipboard is a processing and display system which correlates and fuses sensor inputs from radar and IFF. The correlated sensor data is displayed to Air Traffic Controllers in a 2D air picture to facilitate the safe and expeditious movement of air traffic operating in the carrier controlled area and launching from/recovering to the ship. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NAWCAD Various Dec 2024 New/Option Quantity Unit Cost 1 3.168 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 34 24 Apr 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 15 of 37 P-1 Line #5 Volume 1 - 99 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: NAVY MULTI-BAND TERMINAL (NMT) PARM Code: PMW 170 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 29.786 Spares 1.027 System Engineering 0.081 Technical Engineering Services 0.094 Other Costs 0.568 Total 1 31.556 Description: The Advanced Extremely High Frequency (AEHF) Navy Multi-band Terminal (NMT) will be used to receive signals from the Advanced EHF satellites which is a follow-on to the DoW's highly secure, highly protected MILSTAR communications satellite system. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 L3 Technologies C/FFP Sep 2024 New/Option Quantity Unit Cost 1 29.786 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 31 18 Jan 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 16 of 37 P-1 Line #5 Volume 1 - 100 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SLQ-32(V)7, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK PARM Code: PEO IWS 2E 3 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 98.616 Ancillary Equipment 0.655 Spares 2.688 System Engineering 2.022 Technical Engineering Services 4.089 Other Costs 55.030 Total 1 163.100 Description: SEWIP Block 3 is a scalable Electronic Warfare enterprise suite to provide improved Electromagnetic Interference (EMI) mitigation and Combat System Interface capabilities to select new construction ships as well as upgrade current AN/SLQ-32(V)3 and (V)4 Electronic Warfare (EW) suites on existing ships. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning and protection from anti-ship missiles. SEWIP Block 3 provides Electronic Attack (EA) capability improvement required for the AN/SLQ-32(V) system to keep pace with the evolving threat. The program builds on the EW Electronic Support (ES) capability delivered by Blocks 1 and 2 and provides a common EA capability to surface ships. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 TBD TBD Aug 2028 New/Option Quantity Unit Cost 1 98.616 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 24 18 Aug 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 17 of 37 P-1 Line #5 Volume 1 - 101 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SPECTRAL PARM Code: PMW 120 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 15.998 Spares 0.721 System Engineering 0.858 Technical Engineering Services 0.191 Other Costs 1.333 Total 1 19.101 Description: Spectral is the Navy's next-generation shipboard Information Operations (IO), Electromagnetic Maneuver Warfare (EMW), Signals Intelligence (SIGINT) weapon system. Spectral will detect, classify, and track Signals of Interest (SOI) beyond currently fielded capabilities to improve warfighter mission effectiveness through automation, operability, and intuitiveness in the Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) process, specifically in the provision of combat identification, threat tracking, and offensive IO effects. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 TBD TBD Sep 2027 New/Option Quantity Unit Cost 1 15.998 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 18 Sep 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 18 of 37 P-1 Line #5 Volume 1 - 102 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SRC-66(V)3 HFDAG PARM Code: PMW 170 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 6.014 Spares 0.011 System Engineering 0.375 Technical Engineering Services 0.439 Other Costs 0.228 Total 1 7.067 Description: High Frequency (HF) Distributed Amplifier Group (DAG) is the Navy's Program of Record (POR) HF system and is the follow-on replacement of HF Radio Group (HFRG). HFDAG has a modular architecture and utilizes COTS equipment to the maximum extent possible. It provides Line Of Sight (LOS/Beyond Line of Sight (BLOS) voice and data transmission capabilities to USN Ships. The 16-channel CVN variant greatly improves capabilities from HFRG: (1) increases availability (Ao), (2) provides reprogrammable waveforms, (3) increases the number of waveforms available, (4) provides automatic link establishment (ALE). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NAWCAD WR Mar 2024 New/Option Quantity Unit Cost 1 6.014 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 18 Sep 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 19 of 37 P-1 Line #5 Volume 1 - 103 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USN-3(V)1 SATELLITE SIGNAL LANDING SYSTEM (SSLS) PARM Code: PMA 213 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 9.661 Spares 0.076 System Engineering 0.802 Technical Engineering Services 0.529 Other Costs 2.414 Total 1 13.482 Description: AN/USN-3(V)1 Satellite Signal Landing System (SSLS) is the primary precision approach and landing system for CVN ships to support F-35B, F-35C, MQ-25 and future platforms. SSLS ship systems are required to provide a primary precision approach capability during night and instrument flight conditions and coupled approach to the deck (auto-land) capability aboard CVN ships. SSLS also provides over-theair inertial alignment capability for CVN ships to support aircraft platforms without Link-4A capability, including F-35, MQ-25 and future platforms. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 RAYTHEON C/FFP Jan 2026 New/Option Quantity Unit Cost 1 9.661 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 30 12 Aug 2030 Competition/Second Source Initiatives: None Remarks: Satellite Signal Landing System (SSLS) is formerly known as Joint Precision Aircraft Landing System (JPALS). LI 2004 - CVN-81 Navy UNCLASSIFIED Page 20 of 37 P-1 Line #5 Volume 1 - 104 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER PARM Code: PMW 170 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 7.970 System Engineering 0.068 Technical Engineering Services 0.069 Other Costs 0.125 Total 1 8.232 Description: OA-9277 Description: Ultra High Frequency (UHF) Program supports the exchange of secure Battle Group coordination data, organizational messaging, tactical data and voice over UHF SATCOM via Demand Assigned Multiple Access (DAMA) over 5/25kHz channels. UHF legacy Communication Line of Sight (LOS) Systems also support Anti-Access/Area Denial (A2AD) by providing a redundant or overlapping form of communication in case U.S. satellites are targeted by threat nations. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 RF Products C/IDIQ Sep 2023 New/Option Quantity Unit Cost 1 7.970 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 30 24 Aug 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 21 of 37 P-1 Line #5 Volume 1 - 105 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/WSN-12(V)1, RING LASER GYRO NAVIGATOR (RLGN) PARM Code: PEO IWS 6.0 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 5.846 Spares 0.364 System Engineering 0.889 Technical Engineering Services 0.233 Other Costs 0.744 Total 1 8.076 Description: The AN/WSN-12(V)1 Ring Laser Gyro Navigation (RLGN) System calculates and disseminates own ship's position, velocity and attitude (heading, roll and pitch) data outputs. The AN/WSN-7(V)1 RLGN System provides real time navigation data to use by navigation & combat systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Northrop Grumman C/FFP Sep 2025 New/Option Quantity Unit Cost 1 5.846 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 47 18 Sep 2028 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 22 of 37 P-1 Line #5 Volume 1 - 106 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USQ-214(V)1, NETWORK TACTICAL COMMON DATA LINK (NTCDL) SYSTEM PARM Code: PMW 170 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 6.416 Spares 0.858 System Engineering 0.250 Technical Engineering Services 0.259 Other Costs 0.643 Total 1 8.426 Description: NTCDL provides the ability to transmit/receive real-time intelligence, surveillance, and reconnaissance (ISR) data simultaneously from multiple sources (air, surface, subsurface, and man-portable) and exchange command and control information (voice, data, imagery, and full-motion video) across dissimilar joint, service, coalition, and civil networks. NTCDL provides warfighters the capability to support multiple, simultaneous, networked operations with in-service CDL equipped aircraft (e.g., F/A-18, P-3, and MH- 60R) in addition to next-generation manned and unmanned platforms (e.g., P-8 Poseidon, Triton, Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) vehicle, Small Tactical Unmanned Aircraft Systems (STUAS), and Fire Scout). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 BAE Systems Information and Electronic Systems Integration Inc C/FFP Mar 2022 New/Option Quantity Unit Cost 1 6.416 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 31 14 May 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 23 of 37 P-1 Line #5 Volume 1 - 107 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 53 MOD 15 DECOY LAUNCHING SYSTEM (DLS) PARM Code: PEO IWS 2D1 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 3.785 Technical Data and Documentation 0.079 Spares 0.082 System Engineering 0.655 Technical Engineering Services 3.491 Other Costs 11.908 Total 1 20.000 Description: The MK 53 MOD 15 DLS is an integral part of the surface Electronic Warfare (EW) suite in the ship self-defense system. The system provides protection against active Radio Frequency anti-ship missile attacks. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Sechan Electronics C/FFP Jan 2025 New/Option Quantity Unit Cost 1 3.785 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 48 30 Aug 2027 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 24 of 37 P-1 Line #5 Volume 1 - 108 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: I-STALKER PARM Code: PEO IWS 2.0 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 4.199 Ancillary Equipment 0.052 Spares 0.149 System Engineering 0.496 Technical Engineering Services 1.769 Other Costs 0.835 Total 1 7.500 Description: I-STALKER provides a Long Range Narrow Field of View for threat identification and 24/7 man in the loop enhanced situational awareness for Bridge, Commanding Officer (CO), and Combat Information Center (CIC) watch bystanders by providing integration and control of stand-alone Electro Optic/Infrared (EO/IR) sensors via Situational Awareness System (SAwS) interface Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 TBD TBD Jan 2028 New/Option Quantity Unit Cost 1 4.199 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 32 17 Jan 2030 Competition/Second Source Initiatives: N/A Remarks: New capability added to technical baseline. CVN 79 is receiving a refurbished unit. CVN 81 is procuring a new unit as existing asset is unavailable for refurbishment. LI 2004 - CVN-81 Navy UNCLASSIFIED Page 25 of 37 P-1 Line #5 Volume 1 - 109 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ELECTROMAGNETIC AIRCRAFT LAUNCHING SYSTEM (EMALS) PARM Code: PMA 251 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 1,130.077 Spares 6.437 System Engineering 17.291 Technical Engineering Services 0.532 Other Costs 37.192 Total 1 1,191.529 Description: EMALS is an advanced technology electrically generated launching system that uses a moving electromagnetic field to propel aircraft to launch speed. EMALS is made up of six primary sub-systems: prime power interface, energy storage, energy distribution, power conversion, launch motor, and launch control subsystem. Benefits over the current C13 steam catapults include reduced weight and volume, greater launching flexibility for future aircraft, improved control, and reduced manning workload requirements. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 81 GENERAL ATOMICS SS/FFP Nov 2021 Option Quantity Unit Cost 1 1,130.077 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 57 48 May 2025 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 26 of 37 P-1 Line #5 Volume 1 - 110 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPY-6(V)3 ENTERPRISE AIR SURVEILLANCE RADAR (EASR) PARM Code: PEO IWS 2.0 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 53.710 Ancillary Equipment 0.193 Spares 1.439 System Engineering 8.745 Technical Engineering Services 5.114 Other Costs 6.177 Total 1 75.378 Description: The Enterprise Air Surveillance Radar (EASR) suite will be a modern long-range, three-dimensional (3D) radar used to search, detect and provide space-stabilized, three-coordinate (range, bearing, height) data for air intercept control and designation to a weapon system and Air Traffic Control (ATC) system. The Enterprise Radar Suite (ERS), which includes EASR, is intended to replace the functions that Dual Band Radar (DBR) performed on CVN 78, but at a much lower cost. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 RAYTHEON C/CPIF Aug 2025 New/Option Quantity Unit Cost 1 53.710 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 30 30 Feb 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 27 of 37 P-1 Line #5 Volume 1 - 111 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ADVANCED ARRESTING GEAR (AAG) PARM Code: PMA 251 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 551.603 Spares 0.200 System Engineering 13.108 Technical Engineering Services 0.488 Other Costs 30.711 Total 1 596.110 Description: AAG provides an upgraded ability to recover all existing and projected aircraft carrier based air vehicles. The AAG system will replace the Mark 7 arresting gear system found on the NIMITZ Class carriers for the FORD Class. AAG consists of six primary systems: energy absorption subsystem, energy storage subsystem, dynamic control subsystem, thermal management subsystem, cross deck pendant, and the control subsystem. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 81 GENERAL ATOMICS SS/FFP Dec 2021 Option Quantity Unit Cost 1 551.603 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 64 48 Oct 2024 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 28 of 37 P-1 Line #5 Volume 1 - 112 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: PHALANX BLOCK 1B MK 15 MOD 21 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) PARM Code: IWS 11 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 3 22.657 Ancillary Equipment 0.278 Spares 0.485 System Engineering 1.768 Technical Engineering Services 0.988 Other Costs 2.167 Total 3 28.343 Description: Phalanx is a high fire rate Close-In Weapon System (CIWS) that automatically acquires, tracks, and destroys Anti-Ship cruise missiles, Helos, Aircraft, and all types of Surface threats. The installed version will have one MK-15 Mod 21 and two MK-15 Mod 22 CIWS systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 RAYTHEON C/FFP Dec 2027 New/Option Quantity Unit Cost 3 7.552 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 28 22 Dec 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 29 of 37 P-1 Line #5 Volume 1 - 113 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) PARM Code: PEO IWS 5E FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 3.100 Spares 0.220 System Engineering 0.093 Other Costs 0.271 Total 1 3.684 Description: CV-TSC provides for carrier organic Anti-submarine Warfare (ASW), Mine Warfare (MIW), Surface Warfare (SUW), and other composite warfare area sensor data processing, tactical command and control, and organic/battle-group aircraft mission support. CV-TSC supports both ship self-defense and embarked Destroyer Squadron (DESRON) missions. This system is Open Architecture Computing Environment (OACE), Joint Fires Network (JFN), and FORCEnet compliant. It includes redesign to maximize introduction of expected transformational technologies such as Common Processing System (CPS), Common Display System (CDS), sensor processing in support of the MH-60R helicopter, high-speed bandwidth network, Excomm systems, net-centric warfare components, etc. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 DRS Laurel Technologies C/FFP Oct 2023 New/Option Quantity Unit Cost 1 3.100 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 18 Sep 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 30 of 37 P-1 Line #5 Volume 1 - 114 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK-57 NATO SEASPARROW MISSILE SYSTEM (NSSMS) PARM Code: PEO IWS 12 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 40.165 Ancillary Equipment 0.432 Spares 1.788 System Engineering 0.811 Technical Engineering Services 0.768 Other Costs 1.885 Total 1 45.849 Description: The NATO SeaSparrow Surface Missile System (NSSMS) is a medium range self-defense missile system capable of defeating near/mid-term air/surface threats. The NSSMS MK 57 is comprised of (4) MK 9 tracker/illuminator radars and (2) MK 29 ESSM Guided Missile Launchers (GML) that connect to and support the SSDS Integrated Combat System (ICS). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NSWC PHD Various Apr 2025 New/Option Quantity Unit Cost 1 40.165 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 18 36 Aug 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 31 of 37 P-1 Line #5 Volume 1 - 115 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) PARM Code: PMA 251 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 5.108 System Engineering 0.944 Technical Engineering Services 0.588 Other Costs 2.132 Total 1 8.772 Description: ADMACS is a virtual, seamless, data sharing, knowledge based data system that provides interface for all aviation data systems. It is a tactical real-time information management system maintaining data integrity throughout the ship spaces that manage aircraft launch and recovery operations on board the carrier. ADMACS includes data from launch and recovery equipment, air traffic control, aviation maintenance, landing signaling officer, etc. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NAWCAD Various Mar 2023 New/Option Quantity Unit Cost 1 5.108 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 28 12 Oct 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 32 of 37 P-1 Line #5 Volume 1 - 116 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 49, MOD 3 ROLLING AIRFRAME MISSILE (RAM) PARM Code: PEO IWS 11 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 18.650 Ancillary Equipment 0.293 Spares 0.160 System Engineering 1.306 Technical Engineering Services 0.437 Other Costs 1.644 Total 2 22.490 Description: The MK 49 Mod 5 Rolling Airframe Missile (RAM) Weapon System is a lightweight, low cost, high power system for anti-ship missile defense against current and evolving threats. The Block 2 upgrade adds the capability of infrared, all-the-way missile guidance while maintaining the original dual-mode (RF/IR) capability. The helos, aircraft, and surface (HAS) upgrade enable the engagement of asymmetric threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 TBD TBD Aug 2027 New/Option Quantity Unit Cost 2 9.325 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 33 21 Aug 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 33 of 37 P-1 Line #5 Volume 1 - 117 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPQ-9B, ANTI-SHIP MISSILE DEFENSE (ASMD) SURFACE SURVEILLANCE AND TRACKING RADAR PARM Code: PEO IWS2B FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 4.884 Spares 0.222 System Engineering 1.287 Technical Engineering Services 0.825 Other Costs 1.557 Total 1 8.775 Description: SPQ-9B is a multimode, x-band, narrow beam, pulse Doppler radar that detects and tracks sea-skimming missiles (ASMD) at the horizon in heavy clutter while simultaneously providing detection and tracking of surface targets. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Laurel Technologies Partnership/DRS SS/FFP Mar 2022 New/Option Quantity Unit Cost 1 4.884 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 35 18 Sep 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 34 of 37 P-1 Line #5 Volume 1 - 118 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) PARM Code: PMA 251 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 9.074 System Engineering 0.261 Technical Engineering Services 0.055 Other Costs 0.564 Total 1 9.954 Description: Improved Fresnel Lens Optical Landing System (IFLOLS) MK 13 Mod 2 is the primary visual landing aid system that displays glide path and trend information to a fixed wing pilot approaching the CVN flight deck. The system presents a display that is visible at a range of 1.0 nautical mile and displays a virtual image (ball) that is dynamically stabilized to compensate for ship's pitch, roll and heave motion. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 NAWCAD Various Feb 2026 New/Option Quantity Unit Cost 1 9.074 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 49 12 Jan 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 35 of 37 P-1 Line #5 Volume 1 - 119 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) PARM Code: PMA 251 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 3.628 System Engineering 0.378 Technical Engineering Services 0.966 Other Costs 1.424 Total 1 6.396 Description: ILARTS provides a method for observing and retaining a video record of each aircraft launch and recovery. The system simultaneously monitors and records aircraft recoveries and launches during day and night operations. It also provides the LSO with information on the aircraft lineup during recovery. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 81 Gardner Technologies Inc C/FFP Dec 2024 New/Option Quantity Unit Cost 1 3.628 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 49 12 Jan 2029 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 36 of 37 P-1 Line #5 Volume 1 - 120 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2004 / CVN-81 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: UNMANNED AVIATION WARFARE CENTER (UAWC) PARM Code: PMA 268 FY 2020 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 32.515 Technical Engineering Services 13.600 Total 1 46.115 Description: The Unmanned Aviation Warfare Center (UAWC) will be the location from which the Air Vehicle Pilots (AVPs) control the MQ-25 unmanned aircraft using existing carrier communication systems and networks. MQ-25 payload sensor data will also be distributed throughout the carrier from the UAWC. The control station, also called the MD-5, consists of the following components: the Multi-Domain Control Capability (MDCX) which will be 7-9 AVP consoles and 3-4 server racks, the Video Management System (VidMS) and Air Traffic Control (ATC) picture for situational awareness, the Unmanned Carrier Aviation Transport System (UTS) for integration with ship networks and generation of the mission plan for the MQ-25, the ARC-210 Radio Communication System (RCS), the Digital Modular Radio (DMR), and the integrated communication system half-rack that allows AVPs access to existing ship radios. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 81 Lockheed Martin TBD Jun 2028 New Quantity Unit Cost 1 32.515 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 81 Feb 2034 20 24 Jun 2030 Competition/Second Source Initiatives: None LI 2004 - CVN-81 Navy UNCLASSIFIED Page 37 of 37 P-1 Line #5 Volume 1 - 121 === page 172 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 122 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2013 / Virginia Class Submarine Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0604580N, 0204281N Line Item MDAP/MAIS Code: 516 Resource Summary Procurement Quantity (Units in Each) Prior Years FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2029 To FY 2031 Complete FY 2030 Total 40 1 1 2 Gross/Weapon System Cost ($ in Millions) 124,749.281 9,500.534 5,389.109 11,437.036 Less PY Advance Procurement ($ in Millions) 33,833.682 1,871.623 2,052.212 2,202.170 Less Cost To Complete ($ in Millions) 5,588.193 - - - - - - - - - - 5,588.193 1,950.000 - - - - - - - - - - 1,950.000 Less Subsequent Year Full Funding ($ in Millions) - FY 2028 2 2 2 2 2 6 58 0.000 11,437.036 11,284.824 11,098.426 10,196.613 10,594.230 34,143.823 228,393.876 - 2,202.170 2,303.210 2,389.410 2,612.924 2,512.463 10,736.079 60,513.773 Less Economic Order Quantity ($ in Millions) 6,309.880 272.007 596.592 832.550 - 832.550 832.549 832.550 300.319 658.688 2,757.600 13,392.735 Net Procurement (P-1) ($ in Millions) 77,067.526 7,356.904 2,740.305 8,402.316 0.000 8,402.316 8,149.065 7,876.466 7,283.370 7,423.079 20,650.144 146,949.175 Plus Subsequent Year Full Funding ($ in Millions) - 1,950.000 - - - - - - - - - Full Funding TOA ($ in Millions) 77,067.526 9,306.904 2,740.305 8,402.316 - 8,402.316 8,149.065 7,876.466 7,283.370 7,423.079 Plus CY Advance Procurement ($ in Millions) 35,856.222 2,421.954 2,418.954 4,143.618 - 4,143.618 4,485.333 4,199.853 2,880.198 2,909.976 - Plus Cost To Complete ($ in Millions) 2,317.567 293.004 510.415 605.375 - 605.375 376.720 1,108.900 671.667 902.210 - 6,785.858 Plus Economic Order Quantity ($ in Millions) 7,669.917 1,298.349 707.862 1,501.595 1,433.476 781.536 - 13,392.735 122,911.232 13,320.211 6,377.536 14,686.814 12,268.711 12,016.801 Total Obligation Authority ($ in Millions) - - 13,151.309 0.000 13,151.309 13,011.118 20,650.144 1,950.000 20,650.144 148,899.175 59,316.108 228,393.876 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 1,873.213 136.066 218.616 162.796 - 162.796 102.800 209.044 197.499 223.110 1,959.530 5,082.674 124,784.445 13,456.277 6,596.152 13,314.105 - 13,314.105 13,113.918 14,895.858 12,466.210 12,239.911 22,609.674 233,476.550 3,118.732 9,500.534 5,389.109 5,718.518 - 5,718.518 5,642.412 5,549.213 5,098.307 5,297.115 5,690.637 3,937.825 Description: MISSION: To seek out and destroy enemy ships across a wide spectrum of tactical scenarios, working both independently and in concert with a battle group/other ships, providing Joint Commanders with early, accurate knowledge of the battlefield on which power may be projected from sea; covert striking power against targets ashore; the capability to establish covertly an expeditionary force on land; and the maritime strength to destroy enemy naval forces and interdict seaborne commerce. Note: The program is currently executing the fourth Multi-Year Procurement (MYP) (Block V) contract which was awarded on 2 December 2019, modified on 22 March 2021 to exercise an option for a tenth SSN, and subsequently modified on 30 April 2025 to include the FY 2024 eleventh and twelfth SSNs. The April 2025 modification includes funds received via the American Relief Act (ARA) of 2025 (H.R.10545) to support construction of the FY 2024 hulls ($1,950 million) and FY 2025 hull ($1,528 million), as well as investments in shipbuilder workforce support and infrastructure enhancements ($2,213 million). Block V incorporates Acoustic Superiority (AS) modifications on all SSNs, and VIRGINIA Payload Module (VPM) beginning with SSN 803. All Block V SSNs will include modifications to provide enhanced capability and improved performance based upon efforts performed via RDT&E (PE 0604558N/Prj 1947). VPM is an 84-foot hull section with four additional payload tubes, each capable of carrying seven Tomahawk cruise missiles or various other payloads. VPM helps mitigate the loss of undersea strike capability with the retirement of the Service's four guided missile submarines (SSGNs) in the late-2020s. Funding associated with these changes to the baseline are shown in more detail on subsequent pages of these exhibits. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 1 of 17 P-1 Line #6 Volume 1 - 123 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2013 / Virginia Class Submarine Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0604580N, 0204281N Line Item MDAP/MAIS Code: 516 The program is currently planning the fifth MYP (Block VI) contract for FY 2025 - FY 2029 procurements. The FY 2027 request for VIRGINIA Class Submarine (VCS) includes $12,545,934 thousand and quantity 2 of discretionary and $1,440,000 thousand and quantity 0 of mandatory for a total of $13,985,934 thousand and quantity of 2. The $1,440,000 of mandatory funds Submarine Capacity and Long-Term Expansion (SCALE), shipyard systems and infrastructure investments necessary to enable independent build of VCS submarines at each of the two shipbuilders, General Dynamics Electric Boat and Newport News Shipbuilding. The FY 2027 mandatory funds are different from the FY 2026 mandatory funds that funded one FY 2026 VCS. The FY 2026 spend plan amount for VCS includes $6,377,536 thousand and quantity 1 of discretionary and $4,600,000 thousand and quantity 1 of mandatory (reconciliation) for a total of $10,977,536 thousand and quantity 2. FY 2027 funds two VCS with Virginia Payload Module (VPM), Advance Procurement (AP) for future SSNs, $40,000 thousand of Submarine Industrial Base (SIB) investment for construction spares to help de-risk schedules, as well as $1,728,170 thousand for Nuclear Shipbuilder Productivity Enhancements (Advance Procurement funded in Plans - see exhibit P-10). FY 2027 includes Completion of Prior Year Shipbuilding Programs (cost-to-complete) for the Block IV FY 2018 SSNs 800 and 801 ($44,244 thousand), and FY 2019 SSNs 802 and 803 ($561,131 thousand) to finance the Government responsible portion of the shipbuilding construction contract overrun. FY 2027-FY 2031 includes cost-to complete funding that supports program estimates. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 2 of 17 P-1 Line #6 Volume 1 - 124 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2013 / Virginia Class Submarine Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0604580N, 0204281N Line Item MDAP/MAIS Code: 516 Characteristics: Length Overall Beam Displacement Draft Baseline (B/L) B/L w/ VPM(SSN803 & out) 377 feet 34 feet 7830 tons 32 feet 461 feet 34 feet 10174 tons 31 feet Production Status: SSN 799 SSN 800 SSN 801 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Apr 2014 Apr 2014 Apr 2014 140 months 99 months Dec 2025 Dec 2025 Nov 2027 152 months 105 months Dec 2026 Dec 2026 Nov 2027 Production Status: SSN 806 (1) SSN 803 SSN 804 SSN 805 Dec 2019 Dec 2019 Dec 2019 Dec 2019 157 months 104 months May 2027 May 2027 Apr 2028 105 months 108 months Sep 2028 Sep 2028 Aug 2029 115 months 112 months Jul 2029 Jul 2029 Jan 2031 126 months 117 months Jun 2030 Jun 2030 Sep 2031 129 months 112 months Sep 2030 Sep 2030 Dec 2031 SSN 807 SSN 808 SSN 809 SSN 810 SSN 811 SSN 812 136 months 104 months Apr 2031 Apr 2031 Jun 2032 145 months 110 months Jan 2032 Jan 2032 Mar 2033 143 months 99 months Nov 2031 Nov 2031 Jan 2033 151 months 103 months Jul 2032 Jul 2032 Sep 2033 155 months 102 months Nov 2032 Nov 2032 Dec 2033 160 months 101 months Apr 2033 Apr 2033 May 2034 116 months 107 months Dec 2034 Dec 2034 Dec 2035 Production Status: SSN 813 Apr 2025 SSN 814 SSN 815 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date SSN 816 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Dec 2019 105 months 104 months Jan 2034 Jan 2034 Jan 2035 Dec 2019 SSN 802 Dec 2019 (2) May 2026 May 2026 107 months 103 months Apr 2035 Apr 2035 Mar 2036 112 months 102 months Sep 2035 Sep 2035 Oct 2036 Dec 2019 Dec 2019 (3) SSN 817 SSN 818 May 2026 May 2026 May 2026 117 months 101 months Feb 2036 Feb 2036 Feb 2037 122 months 100 months Jul 2036 Jul 2036 Jul 2037 127 months 99 months Dec 2036 Dec 2036 Dec 2037 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Oct 1993 Sep 1995 Contract Design Oct 1994 Sep 1996 Detail Design Jan 1996 Jun 2004 LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 3 of 17 Dec 2019 Reissue P-1 Line #6 Apr 2025 Reissue Complete / Response Volume 1 - 125 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2013 / Virginia Class Submarine Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0604580N, 0204281N Line Item MDAP/MAIS Code: 516 Design Schedule Start / Issue Complete / Response Request for Proposals N/A N/A Design Agent Electric Boat Reissue Reissue Complete / Response Classification of Cost Estimate: C Footnotes: (1) (2) (3) These VIRGINIA Class exhibits reflect Block V incorporating changes for AS on all SSNs and VPM beginning with SSN 803. SSN 814 and subsequent SSNs reflect estimated construction spans for platforms not yet under contract and will be adjusted as needed based on the outcome of final contract negotiations. Reconciliation Ship LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 4 of 17 P-1 Line #6 Volume 1 - 126 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Cost Categories (†) indicates the presence of a P-8a Plan Costs FY 2017 Qty (Each) ($ M) 2 Basic Construction/Conversion FY 2018 Total Cost 180.184 Qty FY 2019 Total Cost (Each) ($ M) 2 187.778 Qty FY 2020 Total Cost (Each) ($ M) 2 472.813 Qty FY 2021 Total Cost (Each) ($ M) 2 394.106 Qty FY 2022 Total Cost (Each) ($ M) 2 303.171 Qty FY 2023 Total Cost (Each) ($ M) 2 252.399 Qty FY 2024 Total Cost (Each) ($ M) 2 192.169 Qty Total Cost (Each) ($ M) 2 207.166 3,773.705 3,915.756 5,140.029 6,126.117 5,870.865 5,525.279 5,369.398 9,070.762 73.043 74.536 87.952 103.891 100.610 94.912 102.067 185.118 515.852 525.653 482.551 546.354 529.936 540.536 551.346 562.372 Technology Insertion 12.501 18.000 8.500 15.096 14.800 15.398 15.706 16.020 Propulsion Equipment 1,032.500 1,051.100 871.675 1,047.000 1,083.600 1,046.830 1,083.115 1,121.470 (†) 110.190 112.394 119.028 125.882 128.400 139.293 141.566 144.189 Other Cost 54.058 55.140 60.070 65.168 66.476 67.806 69.162 70.546 Total Ship Estimate 5,752.033 5,940.357 7,242.618 8,423.614 8,097.858 7,682.453 7,524.529 11,377.643 Less Advance Procurement FY 2015 1,152.500 Less Advance Procurement FY 2016 470.788 Change Orders Electronics (†) Hull, Mechanical, and Electrical (HM&E) 1,171.100 - - - - - - - - - - - - - - - - - - - - - - - - Less Advance Procurement FY 2017 - Less Advance Procurement FY 2018 - - Less Advance Procurement FY 2019 - - - Less Advance Procurement FY 2020 - - - - Less Advance Procurement FY 2021 - - - - - Less Advance Procurement FY 2022 - - - - - - Less Advance Procurement FY 2023 - - - - - - - Less Advance Procurement FY 2024 - - - - - - - - Less Advance Procurement FY 2025 - - - - - - - - Less Advance Procurement FY 2026 - - - - - - - - Less Subsequent Full Funding FY 2025 - - - - - - - Less Cost to Complete FY 2023 - - - - - - LI 2013 - Virginia Class Submarine Navy 475.940 1,376.294 752.597 1,167.999 588.903 UNCLASSIFIED Page 5 of 17 1,222.038 618.641 200.000 P-1 Line #6 1,268.947 200.000 - 619.381 1,126.386 - 611.920 1,493.487 804.191 1,950.000 - Volume 1 - 127 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Cost Categories (†) indicates the presence of a P-8a FY 2017 Qty (Each) FY 2018 Total Cost ($ M) Qty (Each) FY 2019 Total Cost ($ M) Qty (Each) FY 2020 Total Cost ($ M) Qty (Each) FY 2021 Total Cost ($ M) Qty (Each) FY 2022 Total Cost ($ M) Qty (Each) FY 2023 Total Cost ($ M) Qty (Each) FY 2024 Total Cost ($ M) Qty (Each) Total Cost ($ M) Less Cost to Complete FY 2024 24.646 - - - - - - - Less Cost to Complete FY 2025 219.370 73.634 - - - - - - Less Cost to Complete FY 2026 99.116 289.761 - - - - - - Less Cost to Complete FY 2027 - 44.244 561.131 - - - - - Less Cost to Complete FY 2028 - - 181.309 - - - - Less Cost to Complete FY 2029 - - - - - - Less Cost to Complete FY 2030 - - - - 396.920 274.747 - - - 121.311 506.949 Less Cost to Complete FY 2031 - 195.411 744.526 364.374 - - Less EOQ FY 2014 194.909 169.909 - - - - 273.950 - - Less EOQ FY 2015 251.603 231.618 - - - - - - Less EOQ FY 2016 151.116 178.836 - - - - - - Less EOQ FY 2018 - - 30.611 115.229 31.008 24.126 24.026 - Less EOQ FY 2019 - - - 246.365 246.365 246.365 246.365 - Less EOQ FY 2020 - - - - 293.988 293.988 293.988 - Less EOQ FY 2021 - - - - - 213.710 213.710 - Less EOQ FY 2024 - - - - - - - - Less EOQ FY 2025 - - - - - - - - Less EOQ FY 2026 - - - - - - - Net P-1 Funding 3,187.985 LI 2013 - Virginia Class Submarine Navy 3,305.315 4,340.676 5,365.181 UNCLASSIFIED Page 6 of 17 4,603.213 P-1 Line #6 4,234.240 4,534.184 7,129.965 Volume 1 - 128 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs FY 2025 Qty (Each) Qty ($ M) 1 Basic Construction/Conversion FY 2026 Total Cost (Each) 2,595.816 FY 2027 Total Cost Qty ($ M) 1 Total Cost (Each) 219.603 ($ M) 2 223.443 5,326.544 3,136.792 8,889.310 108.705 159.052 181.415 313.264 598.515 624.898 Technology Insertion 16.340 16.667 17.001 Propulsion Equipment 1,004.950 1,035.070 1,273.090 98.937 150.015 153.016 35.978 73.395 74.863 9,500.534 5,389.109 11,437.036 Change Orders Electronics (†) Hull, Mechanical, and Electrical (HM&E) (†) Other Cost Total Ship Estimate Less Advance Procurement FY 2015 - - - Less Advance Procurement FY 2016 - - - Less Advance Procurement FY 2017 - - - Less Advance Procurement FY 2018 - - - Less Advance Procurement FY 2019 - - - Less Advance Procurement FY 2020 - - - Less Advance Procurement FY 2021 - - - Less Advance Procurement FY 2022 - - - - - Less Advance Procurement FY 2023 1,221.460 Less Advance Procurement FY 2024 650.163 1,148.582 - Less Advance Procurement FY 2026 - - Less Subsequent Full Funding FY 2025 - - - Less Cost to Complete FY 2023 - - - Less Cost to Complete FY 2024 - - - Less Cost to Complete FY 2025 - - - Less Cost to Complete FY 2026 - - - Less Cost to Complete FY 2027 - - - Less Cost to Complete FY 2028 - - - Less Cost to Complete FY 2029 - - - Less Cost to Complete FY 2030 - - - Less Cost to Complete FY 2031 - - - Less EOQ FY 2014 - - - Less EOQ FY 2015 - - - LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 7 of 17 903.630 - Less Advance Procurement FY 2025 P-1 Line #6 1,518.324 683.846 Volume 1 - 129 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a FY 2025 Qty (Each) FY 2026 Total Cost Qty ($ M) (Each) FY 2027 Total Cost Qty ($ M) (Each) Total Cost ($ M) Less EOQ FY 2016 - - - Less EOQ FY 2018 - - - Less EOQ FY 2019 - - - Less EOQ FY 2020 - - - Less EOQ FY 2021 - - Less EOQ FY 2024 272.007 Less EOQ FY 2025 - Less EOQ FY 2026 - Net P-1 Funding 7,356.904 - 272.006 272.008 324.586 324.588 2,740.305 235.954 8,402.316 Remarks: These VIRGINIA Class exhibits reflect Block V incorporating changes for AS on all SSNs and VPM beginning with SSN 803. The program is currently planning the fifth MYP (Block VI) contract for FY 2025 - FY 2029 procurements. FY 2027 funds two VIRGINIA Class Submarine (VCS) with Virginia Payload Module (VPM), Advance Procurement (AP) for future SSNs, $40 million of Submarine Industrial Base (SIB) investment for construction spares to help de-risk schedules, as well as $1,728 million for Nuclear Shipbuilder Productivity Enhancements (Advance Procurement funded in Plans - see exhibit P-10). The Electronics profile fluctuation (FY 2019 - FY 2023) reflects improved alignment of non-recurring engineering support to physically and electronically integrate the pre-planned NPES TI-24 Tech Insertion configuration and various phased Undersea Dominance Payloads. The FY 2026 Electronics increase above inflation is for the addition of two Low-Cost Conformal Arrays (LCCA), one per hull. LCCA has been added to the VIRGINIA Class Submarine Block VI technical baseline (FY 2025 - FY 2029). The Electronics increase from FY 2026 to FY 2027 above normal inflation is driven by vendor material increases. FY 2027 includes Completion of Prior Year Shipbuilding Programs (cost-to-complete) for the Block IV FY 2018 SSNs 800 and 801 ($44.2 million), and FY 2019 SSNs 802 and 803 ($561.1 million) to finance the Government responsible portion of the shipbuilding construction contract overrun. FY 2025 Plans includes $2,213 million for Nuclear Shipbuilder Productivity Enhancements and $180 million for SIB investment. The FY2026 Total Ship estimate does not show $4,600,000 thousand and quantity of one funded in FY 2026 mandatory funding. Total ship estimate for FY 2026 is $9,989,109 thousand. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 8 of 17 P-1 Line #6 Volume 1 - 130 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date SSN 799 EB/HII-NNS 2017 Apr 2014 Sep 2017 Dec 2025 SSN 800 EB/HII-NNS 2018 Apr 2014 Mar 2018 Dec 2026 SSN 801 EB/HII-NNS 2018 Apr 2014 Sep 2018 May 2027 EB/HII-NNS 2019 Dec 2019 Sep 2019 Sep 2028 SSN 803 EB/HII-NNS 2019 Dec 2019 Mar 2020 Jul 2029 SSN 804 EB/HII-NNS 2020 Dec 2019 Sep 2020 Jun 2030 SSN 805 EB/HII-NNS 2020 Dec 2019 May 2021 Sep 2030 SSN 806 EB/HII-NNS 2021 Dec 2019 Aug 2022 Apr 2031 SSN 807 EB/HII-NNS 2021 Dec 2019 Nov 2022 Jan 2032 SSN 808 EB/HII-NNS 2022 Dec 2019 Aug 2023 Nov 2031 SSN 809 EB/HII-NNS 2022 Dec 2019 Dec 2023 Jul 2032 SSN 810 EB/HII-NNS 2023 Dec 2019 May 2024 Nov 2032 SSN 811 EB/HII-NNS 2023 Dec 2019 Nov 2024 Apr 2033 SSN 812 EB/HII-NNS 2024 Apr 2025 Jan 2026 Dec 2034 SSN 813 EB/HII-NNS 2024 Apr 2025 May 2025 Jan 2034 EB/HII-NNS 2025 May 2026 Sep 2026 Apr 2035 EB/HII-NNS 2026 May 2026 Mar 2027 Sep 2035 EB/HII-NNS 2026 May 2026 Sep 2027 Feb 2036 SSN 817 EB/HII-NNS 2027 May 2026 Mar 2028 Jul 2036 SSN 818 EB/HII-NNS 2027 May 2026 Sep 2028 Dec 2036 SSN 819 EB/HII-NNS 2028 May 2026 Mar 2029 May 2037 SSN 820 EB/HII-NNS 2028 May 2026 Sep 2029 Oct 2037 SSN 821 EB/HII-NNS 2029 May 2026 Mar 2030 Mar 2038 SSN 822 EB/HII-NNS 2029 May 2026 Sep 2030 Jul 2038 SSN 823 EB/HII-NNS 2030 Dec 2029 Mar 2031 Jun 2038 SSN 824 EB/HII-NNS 2030 Dec 2029 Sep 2031 Nov 2038 SSN 825 EB/HII-NNS 2031 Dec 2029 Mar 2032 Apr 2039 SSN 850 EB/HII-NNS 2031 Dec 2029 Sep 2032 Sep 2039 SSN 802 SSN 814 (1) (2) SSN 815 SSN 816 (3) Footnotes: (1) (2) (3) These VIRGINIA Class exhibits reflect Block V incorporating changes for AS on all SSNs and VPM beginning with SSN 803. SSN 814 and subsequent SSNs reflect estimated construction spans for platforms not yet under contract and will be adjusted as needed based on the outcome of final contract negotiations. Reconciliation Ship LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 9 of 17 P-1 Line #6 Volume 1 - 131 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2025 Electronics Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Sonar, Combat Control & Architecture 1 136.908 2 253.640 2 266.105 Electronic Support Measures (ESM) 1 33.185 2 65.621 2 66.934 Photonics Masts 1 21.633 2 44.133 2 52.035 Universal Modular Mast (UMM) 1 18.619 2 25.170 2 25.673 Exterior Communications System (ECS) Recurring 1 29.184 2 59.535 2 P-35 Items Subtotal 239.529 448.099 60.726 471.473 Major Items System Level Activities 1 21.658 2 44.182 2 45.065 AN/BPS-16 1 3.322 2 6.777 0 6.913 Navigation 1 3.766 2 7.682 0 7.836 CWITT 1 24.492 2 49.963 0 50.962 Non-Propulsion Electronics System, Systems Engineering and Integration (NPES SE&I) 1 19.168 2 39.101 2 Major Items Subtotal 39.883 72.406 147.705 150.659 1.329 2.711 2.766 1.329 2.711 2.766 313.264 598.515 624.898 Other Cost Elements Misc Electronics Other Cost Elements Subtotal Total Electronics Remarks: Beginning in FY 2025, the Sonar, Combat Control & Architecture (SCCA) cost includes the addition of the Low-Cost Conformal Array (LCCA). The Electronics estimate for the FY 2025 hull includes an additional shipset of Electronics AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. The SCCA and Photonics increases from FY 2026 to FY 2027 above normal inflation is driven by vendor material increases. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 10 of 17 P-1 Line #6 Volume 1 - 132 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2025 Hull, Mechanical, and Electrical (HM&E) Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Propulsor P-35 Items Subtotal 1 74.172 2 99.494 2 101.485 74.172 99.494 101.485 1.893 3.862 3.939 1.893 3.862 3.939 HM&E Installation and testing 11.168 22.783 23.239 T&E 10.435 21.287 21.713 SUPSHIP responsible material 1.269 2.589 2.640 Other Cost Elements Subtotal 22.872 46.659 47.592 Total Hull, Mechanical, and Electrical (HM&E) 98.937 150.015 153.016 Major Items CSA Major Items Subtotal Other Cost Elements Remarks: The Propulsor estimate for the FY 2025 hull includes an additional shipset of Propulsor AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 11 of 17 P-1 Line #6 Volume 1 - 133 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Sonar, Combat Control & Architecture PARM Code: N/A FY 2025 P-35 Category Qty (Each) Major Hardware FY 2026 Total Cost Qty ($ M) 1 (Each) 119.403 FY 2027 Total Cost Qty ($ M) 2 Total Cost (Each) 217.931 ($ M) 2 229.682 Technical Engineering Services 1.912 3.900 3.978 Other Costs 15.593 31.809 32.445 Total 1 136.908 2 253.640 2 266.105 Description: The VIRGINIA Class Command, Control, Communications and Intelligence (C3I) System is the electronics suite which will provide required operational and warfighting capability for the Navy's newest attack submarine. The C3I System includes 15 subsystems (23 if all electronically interfaced subsystems are included) integrated by an overarching Architecture Subsystem. This P-35 covers the procurement requirements for the following: C3I Prime Contractor Furnished Equipment (Sonar, Combat Control and Architecture subsystems) and associated Government Furnished Equipment; technical data documentation; spares; technical engineering services; design engineering services; field engineering services; management support services; and shipboard certification efforts. Contract Data: Quantity Unit Cost Option 1 56.161 Jan 2026 Option 2 57.284 Jan 2027 Option 2 62.130 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 Lockheed Martin SS/CPIF Jan 2025 FY 2026 SSN 815 Lockheed Martin SS/CPIF FY 2027 SSN 817 Lockheed Martin SS/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 SSN 814 Apr 2035 26 33 May 2030 FY 2026 SSN 815 Sep 2035 26 33 Oct 2030 FY 2027 SSN 817 Jul 2036 26 33 Aug 2031 Competition/Second Source Initiatives: N/A Remarks: Beginning in FY 2025, the Sonar, Combat Control & Architecture (SCCA) cost includes the addition of the Low-Cost Conformal Array (LCCA). LCCA has been added to the VIRGINIA Class Submarine Block VI technical baseline (FY 2025 - FY 2029). The SCCA P-35 exhibit includes funding for multiple subsystems, contracts and field activities. However, the unit cost in the contract data section reflects only the major contract, Sonar acoustics processing. The SCCA estimate for the FY 2025 hull includes an additional shipset of AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. The Major Hardware increase from FY 2026 to FY 2027 above normal inflation is driven by vendor material increases. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 12 of 17 P-1 Line #6 Volume 1 - 134 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Electronic Support Measures (ESM) PARM Code: N/A FY 2025 P-35 Category Qty (Each) Major Hardware FY 2026 Total Cost Qty ($ M) 1 (Each) 26.723 FY 2027 Total Cost Qty ($ M) 2 Total Cost (Each) 52.437 ($ M) 2 53.487 Technical Engineering Services 1.439 2.937 2.995 Other Costs 5.023 10.247 10.452 Total 1 33.185 2 65.621 2 66.934 Description: The VIRGINIA Class Command, Control, Communications and Intelligence (C3I) System is the electronics suite which will provide required operational and warfighting capability for the Navy's newest attack submarine. The C3I System includes 15 subsystems (23 if all electronically interfaced subsystems are included) integrated by an overarching Architecture Subsystem. This P-35 covers the procurement requirements for the following: Electronic Support Measures (ESM) subsystem Prime Contractor Furnished Equipment, and associated Government Furnished Equipment; technical data documentation; spares; systems engineering; technical engineering services; computer program support; system test & evaluation; field engineering services; management support services; shipboard certification efforts; quality assurance and reliability/maintainability assurance; maintenance of technical data; and contractor support services efforts. This system provides the capability to process a variety of electromagnetic signal types over a wide frequency range in support of all applicable submarine mission areas. Contract Data: Quantity Unit Cost New 1 25.705 Aug 2027 Option 2 26.219 Aug 2028 Option 2 26.743 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 Lockheed Martin C/CPIF Aug 2026 FY 2026 SSN 815 Lockheed Martin C/CPIF FY 2027 SSN 817 Lockheed Martin C/CPIF (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 SSN 814 Apr 2035 26 33 May 2030 FY 2026 SSN 815 Sep 2035 26 33 Oct 2030 FY 2027 SSN 817 Jul 2036 26 33 Aug 2031 Competition/Second Source Initiatives: N/A Remarks: This exhibit includes funding for both the inboard subsystem and the outboard sensors both provided by the prime contractor Lockheed Martin Syracuse, NY. The ESM estimate for the FY 2025 hull includes an additional shipset of AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 13 of 17 P-1 Line #6 Volume 1 - 135 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Photonics Masts PARM Code: N/A FY 2025 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 15.758 FY 2027 Total Cost Qty ($ M) 2 Total Cost (Each) 32.146 ($ M) 2 39.809 Technical Engineering Services 0.708 1.444 1.473 Other Costs 5.167 10.543 10.753 Total 1 21.633 2 44.133 2 52.035 Description: The VIRGINIA Class Command, Control, Communications and Intelligence (C3I) System is the electronics suite which will provide required operational and warfighting capability for the Navy's newest attack submarine. The C3I System includes 15 subsystems (23 if all electronically interfaced subsystems are included) integrated by an overarching Architecture Subsystem. This P-35 covers the procurement requirements for the following: Photonics subsystem Prime Contractor Furnished Equipment; spares; systems engineering; technical engineering services; computer program support; field engineering services; management support services; shipboard certification; maintenance of technical data; and contractor support services efforts. This system consists of two outboard mast/antenna/camera assemblies and the associated inboard processing and display equipment. This system supports visual and infrared (IR) imaging, RF signal communications, early warning and contact direction finding capability. Contract Data: Quantity Unit Cost New 1 15.758 Sep 2026 Option 2 16.073 Sep 2027 Option 2 19.905 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 TBD C/FFP Sep 2025 FY 2026 SSN 815 TBD C/FFP FY 2027 SSN 817 TBD C/FFP (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 SSN 814 Apr 2035 26 30 Aug 2030 FY 2026 SSN 815 Sep 2035 26 30 Jan 2031 FY 2027 SSN 817 Jul 2036 26 30 Nov 2031 Competition/Second Source Initiatives: Contract solicitation for TI26-TI30 configuration inboard equipment in process, supporting SSN815-SSN824 outfitting. Remarks: This exhibit includes funding for both the inboard subsystem provided by prime contractor Lockheed Martin, Manassas VA and the outboard sensors provided by L3Harris. The Major Hardware increase from FY 2026 to FY 2027 above normal inflation is driven by vendor material increases. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 14 of 17 P-1 Line #6 Volume 1 - 136 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Universal Modular Mast (UMM) PARM Code: N/A FY 2025 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 15.969 FY 2027 Total Cost Qty ($ M) 2 19.767 Technical Engineering Services 1.608 3.279 Other Costs 1.042 2.124 Total 1 18.619 2 Total Cost (Each) ($ M) 2 20.162 3.344 2.167 25.170 2 25.673 Description: The VIRGINIA Class Command, Control, Communications and Intelligence (C3I) System is the electronics suite which will provide required operational and warfighting capability for the Navy's newest attack submarine. The C3I System includes 15 subsystems (23 if all electronically interfaced subsystems are included) integrated by an overarching Architecture Subsystem. This P-35 covers the procurement requirements for the following: Modular Mast Prime Contractor Furnished Equipment; technical data documentation; spares; systems engineering; technical engineering services; management support services; shipboard certification; and maintenance of technical data efforts. This system consists of eight common masts for purposes of housing, raising and lowering antenna and other sensor units. Contract Data: Quantity Unit Cost New 1 9.690 Apr 2026 Option 2 9.883 Apr 2027 Option 2 10.081 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 L3 KEO SS/FP Apr 2025 FY 2026 SSN 815 L3 KEO SS/FP FY 2027 SSN 817 L3 KEO SS/FP (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 SSN 814 Apr 2035 37 26 Jan 2030 FY 2026 SSN 815 Sep 2035 37 26 Jun 2030 FY 2027 SSN 817 Jul 2036 37 26 Apr 2031 Competition/Second Source Initiatives: N/A Remarks: The UMM estimate for the FY 2025 hull includes an additional shipset of AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 15 of 17 P-1 Line #6 Volume 1 - 137 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Exterior Communications System (ECS) Recurring PARM Code: N/A FY 2025 P-35 Category Qty FY 2026 Total Cost (Each) Qty ($ M) Major Hardware 1 (Each) 20.628 FY 2027 Total Cost Qty ($ M) 2 Total Cost (Each) 42.081 ($ M) 2 42.923 Technical Engineering Services 3.496 7.132 7.275 Other Costs 5.060 10.322 10.528 Total 1 29.184 2 59.535 2 60.726 Description: The VIRGINIA Class Command, Control, Communications and Intelligence (C3I) System is the electronics suite which will provide required operational and warfighting capability for the Navy's newest attack submarine. The C3I System includes 15 subsystems (23 if all electronically interfaced subsystems are included) integrated by an overarching Architecture Subsystem. Exterior Communications Systems (ECS) is an integration effort with multiple Government-Off-The-Shelf (GOTS) components providing the core ECS capability. The GOTS components of ECS will be provided using existing contracts. This P-35 covers the procurement requirements for the following: ECS GOTS equipment; fabrication/production; systems engineering; system test & evaluation; training; data; technical engineering services; spares and repair parts; and program management. This system provides the capability for seamless, transparent, secure connectivity for information exchange between submarine users and the Global Command and Communications System (GCCS). Contract Data: Quantity Unit Cost New 1 20.628 May 2028 Option 2 21.041 May 2029 Option 2 21.461 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 TBD C/IDIQ May 2027 FY 2026 SSN 815 TBD C/IDDQ FY 2027 SSN 817 TBD C/IDDQ (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 SSN 814 Apr 2035 24 30 Required Award Date Oct 2030 FY 2026 SSN 815 Sep 2035 24 30 Mar 2031 FY 2027 SSN 817 Jul 2036 24 30 Jan 2032 Competition/Second Source Initiatives: N/A Remarks: SAIC is the prime contractor for fabrication and production. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 16 of 17 P-1 Line #6 Volume 1 - 138 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Propulsor PARM Code: N/A FY 2025 P-35 Category Qty (Each) Major Hardware FY 2026 Total Cost Qty ($ M) 1 TECH ENGINEERING SERVICES (Each) 68.130 FY 2027 Total Cost ($ M) 2 1 Total Cost (Each) 87.169 6.042 Total Qty ($ M) 2 88.913 2 101.485 12.325 74.172 2 12.572 99.494 Description: The propulsor consists of Ni-Al-bronze blades and a large steel and inconel fabrication piece. The purpose of the propulsor is to generate proper thrust to propel the ship at a rated speed within the approved limits of torque and shaft RPM, while at the same time meeting acoustic and structural requirements. This design is unique to the VIRGINIA Class. The propulsor consists of a large quantity of government supplied material and a contract for the fixed portion construction and assembly. Contract Data: Quantity Unit Cost New 1 34.697 Mar 2026 Option 2 35.391 Mar 2027 Option 2 36.099 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 SSN 814 BAE Systems C/FFP Mar 2025 FY 2026 SSN 815 BAE Systems C/FFP FY 2027 SSN 817 BAE Systems C/FFP (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 SSN 814 Apr 2035 40 42 Required Award Date Jun 2028 FY 2026 SSN 815 Sep 2035 40 42 Nov 2028 FY 2027 SSN 817 Jul 2036 40 42 Sep 2029 Competition/Second Source Initiatives: N/A Remarks: The Propulsor estimate for the FY 2025 hull includes an additional shipset of AP funding for critical spare materials ensuring critical sub-tier vendors maintain two per year cadence. These Long Lead Time Material (LLTM) procurements will be consumed on future hulls. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 17 of 17 P-1 Line #6 Volume 1 - 139 === page 190 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 140 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 First System (2027) Award Date: First System (2027) Completion Date: Production Leadtime Cost Elements (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) Advance Procurement Nuclear Propulsion Plant Equipment Electronics Equipment (4) (5) NON-Nuclear Propulsion Plant Equipment - Propulsor (6) 30-72 Various 1,273.090 1,336.590 1,403.490 1,473.600 1,547.400 1,624.800 1,706.170 37-43 Various 33.056 33.718 34.392 35.080 35.783 36.497 37.227 36-54 Various 50.498 51.508 52.538 53.589 54.662 55.755 56.870 Long Lead-Time CFE One Year AP (7) 24-58 Various 820.076 598.620 611.172 623.395 692.930 606.423 618.552 Long Lead-Time CFE Two Year AP (8) 24-58 Various 245.234 268.518 273.856 355.949 266.388 271.723 277.157 2,421.954 2,288.954 2,375.448 2,541.613 2,597.163 2,595.198 2,695.976 Total: Advance Procurement Economic Order of Quantity EOQ for FY26 SSNs - Various 324.586 0.000 - - - - EOQ for FY27 SSNs - Various 324.588 235.954 0.000 - - - - EOQ for FY28 SSNs - Various 324.587 235.954 0.000 - - - - EOQ for FY 29 SSNs - Various 324.588 235.954 0.000 - - - - EOQ for FY 30 SSNs - Various - - 0.000 - 300.319 - - EOQ for FY 31 SSNs - Various - - 0.000 - 300.319 358.369 EOQ for FY 32 SSNs - Various - - 0.000 - 300.319 358.369 260.512 EOQ for FY 33 SSNs - Varous - - 0.000 - 300.319 358.369 260.512 EOQ for FY 34 SSNs - Various - - 0.000 - 300.319 358.369 260.512 707.862 - - 1,501.595 1,433.476 781.536 130.000 40.000 - Total: Economic Order of Quantity 1,298.349 - - Plans Supplier Development - Submarine Industrial Base (2034 SSNs) Nuclear Shipbuilder Productivity Enhancements (2034 SSNs) (9) (10) - Various - - Various - Total: Plans Total Advance Procurement/Obligation Authority 3,720.303 - - - - 1,728.170 1,943.720 1,602.690 285.000 214.000 130.000 1,768.170 1,943.720 1,602.690 285.000 214.000 3,126.816 4,143.618 4,485.333 5,701.448 4,313.674 3,691.512 *Note: "When Required" is the number of months required before ship delivery. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 1 of 3 P-1 Line #7 Volume 1 - 141 === page 192 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2027 Production Leadtime Cost Elements When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) Advance Procurement Nuclear Propulsion Plant Equipment Electronics Equipment (4) (5) (6) 30-72 Various - Oct 2026 - 2029 1,403.490 37-43 Various - Dec 2026 - 2028 34.392 36-54 Various - Dec 2026 - 2028 52.538 Long Lead-Time CFE One Year AP (7) 24-58 Various - Jan 2027 - 2028 611.172 Long Lead-Time CFE Two Year AP (8) 24-58 Various - Jan 2027 - 2029 273.856 NON-Nuclear Propulsion Plant Equipment - Propulsor Total: Advance Procurement 2,375.448 Economic Order of Quantity EOQ for FY27 SSNs - Various - - 2027 0.000 EOQ for FY28 SSNs - Various - - 2028 0.000 EOQ for FY 29 SSNs - Various - - 2029 0.000 EOQ for FY 30 SSNs - Various - - 2030 0.000 EOQ for FY 31 SSNs - Various - - 2031 0.000 EOQ for FY 32 SSNs - Various - - 2032 0.000 EOQ for FY 33 SSNs - Varous - - 2033 0.000 EOQ for FY 34 SSNs - Various - - 2034 0.000 Total: Economic Order of Quantity - Plans Supplier Development - Submarine Industrial Base (2034 SSNs) Nuclear Shipbuilder Productivity Enhancements (2034 SSNs) (9) (10) - Various - Jan 2027 - 2034 40.000 - Various - Jan 2027 - 2034 1,728.170 Total: Plans 1,768.170 Total Advance Procurement/Obligation Authority 4,143.618 Description: The Total Ship estimate for the FY 2025 hull includes additional funds in support of critical spare material that will be consumed on future hulls to ensure critical sub-tier vendors maintain two per year cadence. Advance Procurement and EOQ funds essential Long Lead Time materials to meet in yard need dates and multi-year savings for large lot procurements within the multi-year contracts. The footnotes below describe in further details. *Note: "When Required" is the number of months required before ship delivery. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 2 of 3 P-1 Line #7 Volume 1 - 142 === page 193 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Date: April 2026 P-1 Line Item Number / Title: 2013 / Virginia Class Submarine Footnotes: (4) Propulsion Plant Equipment Advance Procurement is required to fund long-lead time propulsion plant equipment, which is the longest lead-time equipment required for construction of nuclear-powered attack submarines, and to ensure production capability that supports projected production quantities. (5) Electronics Equipment AP is required to fund the long-lead time material for the Command and Control System Module (CCSM). AP for the CCSM plays a critical role in early system installation and test in order to keep the CCSM out of the critical path to ship delivery and minimize risk to ship construction. AP is required to procure selected electronics and associated pre-cable kits, cabling, connector plates and mechanical structures to be installed in this module in accordance with Shipyard Required in Yard Dates (RIYD). Pre-cable kits allow the shipyard to establish cable runs and checkout platform interfaces prior to electronics installation. Mechanical structures establish footprint unique packaging to allow electronics to install efficiently. Additionally, this one year AP is for long lead items such as metal fabrication parts (mechanical structures, chassis, drawer slides, mounting hardware), power supplies and cable connectors, subcontract items (Aft Sonar Receive Unit), and acoustic hull sensors (such as DT-574 LAB Hydrophones). (6) Non-Nuclear Propulsion Plant Equipment Propulsor AP is required to satisfy in-yard need dates for ship delivery. Other prior year non-nuclear propulsion plant equipment has been negotiated as CFE in the Construction Contract. (7) Long Lead-Time CFE AP is required to fund long lead time contractor furnished material including the Weapons Handling and Reactor Plant Modules, the Main Propulsion Unit (MPU)/Ship Service Turbine Generator (SSTG), and material procurement associated with VPM (i.e. electrical, valves, flanges, fittings, pipe, fabricated parts, hardware, and tools, etc.) to maintain anticipated ship construction schedules. These and other components are required early in the construction phase to meet the delivery schedule. FY 2027 CFE One Year AP reflects FY 2028 SSN material procurements. (8) (9) FY 2027 CFE Two Year AP reflects FY 2029 SSN initial material procurements. Submarine Industrial Base (SIB) investment (funded in Plans). In addition to the AP funding in FY2026 ($130M) and FY2027 ($40M) there is $180M aligned to Full Funding in FY2025 (funded in Plans). This SIB investment is to strengthen the SIB to support a generational increase in submarine demand and includes the procurement of construction spares that are planned to be consumed on a future VIRGINIA Class Submarine. (10) Nuclear Shipbuilder Productivity Enhancements include investments in wages and shipbuilder infrastructure improvements intended to improve shipbuilder capability, capacity, and efficiency. This also includes funding for funding for Submarine Capacity and Long Term Expansion (SCALE), shipyard systems and infrastructure investments necessary to enable independent build of VCS submarines at each of the two shipbuilders, General Dynamics Electric Boat and Newport News Shipbuilding. In addition to the AP funding in FY 2027 through FY 2029, $2,213 million for Nuclear Shipbuilder Productivity Enhancements is funded in FY 2025 Plans. The FY 2027 Advance Procurement request does not show $1,440,000 thousand of advance procurement funded in mandatory funds to support SCALE. LI 2013 - Virginia Class Submarine Navy UNCLASSIFIED Page 3 of 3 P-1 Line #7 Volume 1 - 143 === page 194 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 144 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2056 / BBG(X) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603564N, 0603573N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 FY 2028 FY 2029 1 17,470.000 0.000 To FY 2031 Complete FY 2030 1 1 13,528.000 12,028.000 500.000 500.000 Total - - - - - - - 1,000.000 - 1,000.000 1,000.000 0.000 0.000 0.000 0.000 0.000 0.000 16,470.000 0.000 12,528.000 11,028.000 - 3 43,526.000 3,500.000 40,026.000 - - - 1,000.000 - 1,000.000 500.000 1,000.000 500.000 500.000 - 3,500.000 0.000 0.000 0.000 1,000.000 0.000 1,000.000 16,970.000 1,000.000 13,028.000 11,528.000 - 43,526.000 13,028.000 11,528.000 - 43,526.000 13,528.000 12,028.000 - 14,508.667 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Millions) - - - 1,000.000 - - 1,000.000 - - 16,970.000 17,470.000 1,000.000 - Description: The Guided Missile Battleship (BBG(X)) program supports the expansion and modernization of the Nation's large surface combatant fleet, reinforcing maritime dominance. The Fiscal Year (FY) 2027 to FY 2031 funding profile procures three BBG(X) next-generation battleships and provides advance procurement funding to support efficient construction schedules. The Battleship is based on the validated requirement for high-end surface capability directly supporting the Navy Warfighting Concept (NWC) and Expanded Maritime Maneuver (EMM) that cannot be met by current fleet assets. Adding capability at the highest end of the Golden Fleet high-low mix, the Battleship's primary role is to deliver high-volume, long-range offensive fires and serve as a robust, survivable forward command and control platform. The expanded size and energy density of the new Battleship provide critical advantages for future naval warfare, offering a future-proof platform with distinct capabilities that enhance deterrence. Its advanced systems will enable true long-range strike with hypersonic weapons housed in new, larger vertical launch systems. Vastly increased power generation, managed by a sophisticated integrated power system with high-capacity energy storage, will support mission-critical directed energy weapons like high-output lasers and electromagnetic railguns, reducing reliance on costly single-use munitions. Furthermore, its advanced naval gunfire offers cost-effective options for strike and defense, and its capacity to embark a fleet command staff enhances survivability by putting commanders closer to the fight. As a flexible command-and-control platform for both manned and unmanned platforms, the Battleship can lead a Surface Action Group, integrate with a Carrier Strike Group, or operate autonomously to secure critical sea lanes. To overcome the capacity limits of the Arleigh Burke-class destroyer and the capability compromises of the previously planned DDG(X), the Battleship is designed specifically to accommodate these advanced weapon systems. The ship's architecture provides the foundational space, weight, power, and cooling for five large weapon stations, enabling the integration of large-format missile launchers, railguns, and highenergy lasers that cannot be incorporated within legacy platforms. The design ensures room for future technological advancements and sends an unmistakable signal of American resolve, inspiring confidence in allies and fear in adversaries. The procurement strategy will build on a multi-disciplinary national collaborative team, with the first ship to be procured in 2028 and projected for delivery in the mid-2030s. An innovative strategy is guiding the new Battleship's design and construction, centered on a state-of-the-art digital workflow. This utilizes modern digital engineering, AI-enabled design, and advanced production practices to reduce cost and schedule risk. Adopting best practices from Korean and Japanese shipbuilding, the approach emphasizes high design maturity before construction begins, precision modular construction, and tight integration between design and production teams. This digital-first, modular approach allows for distributed construction across the industrial base, with U.S. shipyards focusing on final assembly and integration. The strategy is designed to stabilize the workforce, increase industrial resilience, and deliver the new capability more predictably and affordably. To accelerate the delivery of Battleships to the Fleet, the program's acquisition timeline prioritizes the start of Advance Procurement (AP) for the first hull in FY2027, with a construction award in FY2028. The AP and construction awards for the second and third ships are planned to follow within the FYDP. This AP funding is essential for procuring long-lead time government- and contractor-furnished equipment required LI 2056 - BBG(X) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #8 Volume 1 - 145 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2056 / BBG(X) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603564N, 0603573N Line Item MDAP/MAIS Code: N/A early in the construction phase. Key systems include diesel generators, gas turbines, propulsion motors, the AEGIS Weapons System (AWS), missile tubes, and large-format vertical launch systems. Specifically, early procurement of the AEGIS system is critical to enable parallel installation and testing, thereby removing the combat system from the critical path and minimizing risk to the overall shipbuilding schedule. The lead Battleship (BBG(X) 1) will award in April 2028. The ship will begin construction later that year in August 2028. BBG(X) 1 will deliver in August 2036. Note: This program is a new start in FY27. Characteristics: Length Overall Beam Displacement Draft Concept Design Range 840ft 90ft 35,000t 28ft 888ft 105ft 41,000t 33ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Design Schedule Start / Issue Complete / Response Issue Date for TLR Oct 2025 Mar 2026 Issue Date for TLS N/A N/A Preliminary Design Sep 2026 Dec 2027 Contract Design Dec 2027 Jul 2029 Detail Design Jul 2029 Jun 2031 Request for Proposals Jul 2028 Sep 2028 Design Agent Engineering Services Reissue Reissue Complete / Response Classification of Cost Estimate: LI 2056 - BBG(X) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #8 Volume 1 - 146 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2056 / BBG(X) FY 2027 Qty Cost Categories (Each) Total Cost ($ M) Plan Costs Basic Construction/Conversion Change Orders Electronics Hull, Mechanical, and Electrical (HM&E) Ordnance Other Cost Total Ship Estimate - Net P-1 Funding - LI 2056 - BBG(X) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #8 Volume 1 - 147 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2056 / BBG(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date BBG(X) 1 TBD 2028 Apr 2028 Aug 2028 Aug 2036 BBG(X) 2 TBD 2030 Apr 2030 Aug 2030 Aug 2038 BBG(X) 3 TBD 2031 Apr 2031 Aug 2031 Aug 2039 LI 2056 - BBG(X) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #8 Volume 1 - 148 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2056 / BBG(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 First System (2027) Award Date: First System (2027) Completion Date: Production Leadtime Cost Elements (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) Advance Procurement (11) 12-60 Various - - 390.000 195.000 390.000 195.000 195.000 12-42 Various - - 240.000 120.000 240.000 120.000 120.000 12-24 Various - - 58.000 29.000 58.000 29.000 29.000 12-24 Various - - 230.000 115.000 230.000 115.000 115.000 12-24 Various - - 82.000 41.000 82.000 41.000 41.000 Total: Advance Procurement - - 1,000.000 500.000 1,000.000 500.000 500.000 Total Advance Procurement/Obligation Authority - - 1,000.000 500.000 1,000.000 500.000 500.000 PLANS (DETAIL DESIGN) LONG LEAD-TIME CFE (12) AEGIS WEAPONS SYSTEM AP (13) MISSILE TUBE LLTM PRODUCTION & OUTFITTING ORDNANCE SHIPBOARD SYSTEMS LLTM (14) (15) *Note: "When Required" is the number of months required before ship delivery. LI 2056 - BBG(X) Navy UNCLASSIFIED Page 1 of 2 P-1 Line #9 Volume 1 - 149 === page 200 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 2056 / BBG(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2027 Production Leadtime Cost Elements When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) Advance Procurement PLANS (DETAIL DESIGN) LONG LEAD-TIME CFE (11) (12) AEGIS WEAPONS SYSTEM AP (13) MISSILE TUBE LLTM PRODUCTION & OUTFITTING ORDNANCE SHIPBOARD SYSTEMS LLTM (14) (15) 12-60 Various - Jul 2027 - 2028 390.000 12-42 Various - Jul 2027 - 2028 240.000 12-24 Various - Jul 2027 - 2028 58.000 12-24 Various - Jul 2027 - 2028 230.000 12-24 Various - Jul 2027 - 2028 82.000 Total: Advance Procurement 1,000.000 Total Advance Procurement/Obligation Authority 1,000.000 *Note: "When Required" is the number of months required before ship delivery. Footnotes: (11) Shipbuilder and program office support for detail design efforts, including but not limited to, the hull form, weapons system, and propulsion plant. Funds are also necessary to support critical engineering analysis, risk reduction efforts, rapid detail design maturity, and subsequent ship construction timeline. (12) Advance Procurement is required to fund long lead time contractor furnished material including, but not limited to, diesel generators, gas turbine generators, electric motors, and motor drives. These and other components are required early in the construction phase to meet ship delivery schedule. (13) Advance Procurement is required to fund long lead time material supporting the AEGIS Weapons System (AWS). AP for AEGIS plays a critical role in early system installation and testing in order to keep the Combat System out of the critical path to ship delivery and minimize risk to ship construction. (14) Program will execute advanced production of missile tubes to reduce schedule risk, improve manufacturing efficiencies, improve vendor learning, maintain critical production skills, and reduce costs by leveraging high-volume procurements. (15) Advance Procurement is required to fund long lead time material including, but not limited to, components supporting long-range strike and larger vertical launch systems. LI 2056 - BBG(X) Navy UNCLASSIFIED Page 2 of 2 P-1 Line #9 Volume 1 - 150 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2086 / CVN Refueling Overhauls Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - 7 1 Gross/Weapon System Cost ($ in Millions) 30,762.527 8,548.712 0.000 0.000 0.000 0.000 0.000 0.000 Less PY Advance Procurement ($ in Millions) 6,025.023 1,201.073 - - - - - Less Cost To Complete ($ in Millions) 2,606.489 - - - - - - - - - - - - Less Subsequent Year Full Funding ($ in Millions) Less Transfer ($ in Millions) 12,781.922 128.131 Less Previously Appropriated OPN ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) 5,997.913 - To FY 2031 Complete Total 1 1 10 0.000 9,288.866 9,939.412 58,539.517 - - 1,861.835 1,800.068 10,887.999 - - - - - - - - - 3,451.378 - 3,771.414 - 2,606.489 26,002.627 128.131 481.789 538.583 - - - - - - - 568.210 644.525 2,233.107 8,739.173 811.143 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3,407.443 3,723.405 16,681.164 1,579.011 4,418.902 - 4,418.902 - - - 7,222.792 26,002.627 1,579.011 4,418.902 - 4,418.902 3,407.443 10,946.197 42,683.791 53.070 - 53.070 350.448 180.447 1,593.542 10,887.999 379.200 - 379.200 253.700 12,781.922 Full Funding TOA ($ in Millions) 21,521.095 Plus CY Advance Procurement ($ in Millions) 7,226.096 811.143 669.171 - Plus Cost To Complete ($ in Millions) 821.318 Plus Transfer ($ in Millions) 128.131 - - - - - Plus Previously Appropriated OPN ($ in Millions) 2,233.107 - - - - - Total Obligation Authority ($ in Millions) 31,929.747 1,480.314 483.100 2,062.111 4,851.172 0.000 4,851.172 - 647.878 836.518 - - - - - - - - - - 128.131 - - - - - 2,233.107 604.148 647.878 836.518 3,587.890 12,539.739 2,606.489 58,539.517 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 238.198 6.660 12.200 46.565 - 46.565 22.201 30.790 14.409 14.698 58.832 444.553 Total ($ in Millions) 32,167.945 1,486.974 2,074.311 4,897.737 - 4,897.737 626.349 678.668 850.927 3,602.588 12,598.571 58,984.070 Gross/Weapon System Unit Cost ($ in Millions) 4,394.647 8,548.712 9,288.866 9,939.412 5,853.952 - - - - - - - Description: To support and operate aircraft to engage in attacks on targets afloat and ashore which threaten our use of the sea and to engage in sustained operations in support of other forces. The refueling of the reactors and repair and upgrade of the main propulsion equipment will provide for reliable operations during its remaining 23 plus years of ship life using only the normal maintenance cycle. The FY 2027 request for RCOH includes $4,418,918 thousand of discretionary and quantity of 0 and $30,000 thousand and quantity of 0 of mandatory for a total of $4,448,618 thousand and quantity of 0. The mandatory funds will be used to enhance the U.S surface maritime industrial base productivity specifically for firefighting improvements. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 1 of 34 P-1 Line #10 Volume 1 - 151 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2086 / CVN Refueling Overhauls Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft CVN 74 CVN 75 1098 ft 252 ft 100,701 LT 39.81 ft 1098 ft 252 ft 101,321 LT 40.01 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date CVN 74 (1) Jan 2021 87 months 83 months Apr 2028 Jul 2028 Jun 2029 Systems: Electronics Hull, Mechanical, and Electrical Ordnance -C4ISR -ENTERPRISE AIR SURVEILLANCE RADAR (HM&E) -INTEGRATED COMMUNICATION NETWORK (EASR) -LOW PRESSURE AIR PLANT (LPAP) -AVIATION EQUIPMENT & SUPPORT (ICAN / DDCN & IVCN) -VSA O2 GENERATOR -ELECTRONIC CONSOLIDATED AUTOMATED -CIWS/RAM DEFENSE CAPABILITY (CRDC) -FOOD SERVICE EQUIPMENT (FSE) SUPPORT SYSTEM (ECASS) BLOCK 1 -NODE ROOM INSTALL -SHIP SELF DEFENSE SYSTEM (SSDS) MK2 -NATO SEASPARROW SURFACE MISSILE -OPERATOR BALLISTIC PROTECTION FOR MOD 1E SYSTEM (NSSMS) CREW SERVED WEAPONS STATIONS -AN/SPN-50(V)1 - AIR TRAFFIC CONTROL -SURFACE ELECTRONIC WARFARE -PASSIVE COUNTER MEASURE SYSTEM RADAR IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 (PCMS) -AN/SPN-46 OVERHAUL/UPGRADE -COMBAT SYSTEMS SUPPORT CENTER (CSSC) -MK 38 MOD 3 GUN SYSTEM -SATELLITE SIGNAL LANDING SYSTEM (SSLS) RIPOUT/INSTALL -SURFACE ELECTRONIC WARFARE -AN/USG-2B - COOPERATIVE ENGAGEMENT IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 -CARRIER INTELLIGENCE CENTER (CVIC) -CLOSE IN WEAPON SYSTEM (CIWS) BLOCK 1B CAPABILITY (CEC) RIPOUT/INSTALL -AN/SPN-41 REFURBISHMENT -COMBAT DIRECTION CENTER (CDC)/FLAG -MODULAR REFRIGERATION UNIT (MRU) -UNMANNED AVIATION WARFARE CENTER RIPOUT/INSTALL -MEDICAL AND DENTAL SUITE -AN/SPS-73 NEXT GENERATION SURFACE (UAWC) -DECK EDGE DOOR -AN/UPX-29 - IDENTIFICATION FRIEND OR FOE -HANGAR DIVISION DOORS (HDD) SEARCH RADAR (NGSSR) -RAM GUIDED MISSILE LAUNCHING SYSTEM (IFF) INTERROGATOR SET -AIRCRAFT ELEVATOR (ACE) -NAVAL STRIKE WARFARE PLANNING CENTER -AN/SQQ-34C - CARRIER TACTICAL SUPPORT (NSWPC) CENTER -COMMON MUNITIONS & BIT/REPROGRAMMING -RADAR DATA DISTRIBUTION SYSTEM (RDDS) (CMBRE) MAGAZINE OPERATIONS (MAGOPS) -AN/SYY-1 - AIR TRAFFIC CONTROL SYSTEM CVN 75 (2) Sep 2026 62 months 62 months Nov 2031 Jan 2032 Dec 2032 Design Schedule Start / Issue Complete / Response Reissue Reissue Complete / Response Issue Date for TLR Jan 2000 Feb 2000 Mar 2000 Apr 2000 Issue Date for TLS Jan 2001 Feb 2001 Mar 2001 Apr 2001 Preliminary Design Jan 2002 Feb 2002 N/A N/A LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 2 of 34 P-1 Line #10 Volume 1 - 152 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2086 / CVN Refueling Overhauls Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Reissue Reissue Complete / Response Contract Design Jan 2003 Feb 2003 N/A N/A Detail Design Jan 2004 Feb 2004 N/A Apr 2004 Request for Proposals Jan 2005 Feb 2005 Mar 2005 N/A Design Agent [Design Agent] Classification of Cost Estimate: [cost estimate] Justification: FY 2027 is the third and final year of full funding for CVN 75. The CVN 75 RCOH starts in FY 2026 with five years of advance procurement from FY 2020 to FY 2024 and three years of full funding from FY 2025 to FY 2027. Section 123 of the 2020 National Defense Authorization Act limits the use of incremental funding for a period not to exceed six years after advance procurement funds for such nuclear refueling and complex overhaul effort are first obligated (October 2020). The budget supports the planned start of construction at HII-NNS in Sept 2026. The full funding request for CVN 75 RCOH includes $37.8 million in FY27 of funding to complete the delivery of parking garages, programmable space, and additional enhancements for the multi-use facility in FY 2026, initially funded in FY 2024. These procurements support sailor quality of service initiatives. FY 2027 Cost to Complete funding for CVN 74 cost growth and time related charges and due to an additional 5 month delivery delay ($379.2M). Previously appropriated OPN represents reactor power units procured for CVN 74-77 RCOHs. Funding was included with the end cost per Section 1018 of the 2019 National Defense Authorization Act. Footnotes: (1) (2) The redelivery date has been extended to April 2028 due to the current pace of work and testing in support of Steam Plant Testing. Preliminary work at Naval Station Norfolk begins ahead of dry dock availability at the shipbuilder site. The contract award for the CVN 75 RCOH has been postponed to September 2026 due to a late proposal delivery from the shipbuilder and the subsequent negotiation process. The redelivery date has been extended to November 2031 to accommodate the assessed 62-month schedule required to complete the CVN 75 RCOH work package. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 3 of 34 P-1 Line #10 Volume 1 - 153 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs FY 2020 Qty (Each) 1 (†) Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance Qty ($ M) Basic Construction/Conversion Electronics FY 2025 Total Cost (†) (†) Other Cost Total Ship Estimate Total Cost (Each) 66.061 ($ M) 1 79.665 5,662.693 6,365.909 419.070 490.235 616.490 708.876 249.976 196.032 272.508 520.282 158.351 187.713 7,445.149 8,548.712 Less Advance Procurement FY 2016 14.951 - Less Advance Procurement FY 2017 233.149 - Less Advance Procurement FY 2018 75.897 - Less Advance Procurement FY 2019 425.873 - Less Advance Procurement FY 2020 - 16.900 Less Advance Procurement FY 2021 - 17.384 Less Advance Procurement FY 2022 - 66.262 Less Advance Procurement FY 2023 - 612.081 - 488.446 Less Advance Procurement FY 2024 Less Subsequent Full Funding FY 2021 1,531.153 Less Subsequent Full Funding FY 2022 2,233.218 Less Subsequent Full Funding FY 2026 Less Subsequent Full Funding FY 2027 - - 1,579.011 - 4,418.902 Less Cost to Complete FY 2024 42.422 - Less Cost to Complete FY 2025 669.171 - Less Cost to Complete FY 2026 483.100 - Less Cost to Complete FY 2027 379.200 - Less Cost to Complete FY 2028 253.700 - Less Previously Appropriated Prior Year OPN FY 2006 481.789 Less Previously Appropriated OPN FY 2008 Less Previously Appropriated OPN FY 2011 Net P-1 Funding - - 259.696 - 278.887 621.526 811.143 Remarks: Plan Costs reflect actual costs incurred for CVN 74 RCOH. Plan Costs reflect actual costs incurred for CVN 75 RCOH. CVN 74 Basic Construction/Conversion revised due to reallocation of costs from prime shipbuilder to PARMs. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 4 of 34 P-1 Line #10 Volume 1 - 154 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls CVN 75 Basic Construction/Conversion increase is driven primarily by project duration ($90M); projected wage rates, overhead, and material of the shipbuilder as estimated by the government cost estimator ($1,102.752M); restoration of FY25 congressional mark ($250M); rescreening of Ship's Force work to private industry aligning with Quality of Service directives ($125M); CVN-68 Class Main Engine repairs ($53.3M); and Workforce Development Incentives ($8.75M). The execution contract is planned to begin September 2026. The project scope and duration exceed the notional RCOH due to the ship's overall condition, including the largest-ever tank package. The Main Engine Repair estimate includes material and labor costs to repair and overhaul four main engines, which was not previously planned for CVN 75 RCOH. The Workforce Development Incentive supports improvement of Shipbuilder recruitment, training, and retention of a skilled workforce resulting in increased shipyard capacity and productivity. CVN 74 Propulsion Equipment revised to reflect actual costs incurred. CVN 75 Propulsion Equipment increase is due to the contractor's cost revision. Non-nuclear government furnished equipment (GFE) is captured in Electronics, HM&E, and Ordnance. The GFE Governance Program was initiated to target soft costs by challenging performers to achieve savings in program management, system engineering, and logistics support. Procurement details are recorded and reviewed annually to refine and adjust estimates for required products and services to the most current data available. See further details in respective P-8a and P-35 exhibits. CVN 75 RCOH Ordnance Costs increase is due to additional requirements that must complete before the start of construction to support an on-time RCOH and funding increase is required to install SEWIP Block 3, AN/SLQ-32(V)7 system on CVN 75. Other Cost increase is for Quality of Service (QoS) initiatives. Off-ship housing for all Sailors assigned that normally live aboard the vessel and do not receive Basic Allowance for Housing is budgeted for the entire duration of the RCOH (78 months for CVN 74, 62 months for CVN 75) regardless of rank. CVN 74 Plan Costs reflect actual costs incurred. CVN 75 RCOH Plan Costs increase is due to additional engineering requirements that must complete before the start of construction to support an on-time RCOH. Less Previously Appropriated Prior Year OPN FY 2004 and FY 2005 includes the FY 2004 OPN ($234.028M) and FY 2005 OPN ($247.761M) funding supporting the reactor power units and reactor components for CVN 74. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 5 of 34 P-1 Line #10 Volume 1 - 155 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date CVN 74 (1) HUNTINGTON INGALLS INDUSTRIES 2020 Jan 2021 May 2021 Apr 2028 CVN 75 (2) HUNTINGTON INGALLS INDUSTRIES 2025 Sep 2026 Sep 2026 Nov 2031 HUNTINGTON INGALLS INDUSTRIES 2031 Oct 2030 Oct 2030 Feb 2035 CVN 76 Footnotes: (1) (2) The redelivery date has been extended to April 2028 due to the current pace of work and testing in support of Steam Plant Testing. Preliminary work at Naval Station Norfolk begins ahead of dry dock availability at the shipbuilder site. The contract award for the CVN 75 RCOH has been postponed to September 2026 due to a late proposal delivery from the shipbuilder and the subsequent negotiation process. The redelivery date has been extended to November 2031 to accommodate the assessed 62-month schedule required to complete the CVN 75 RCOH work package. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 6 of 34 P-1 Line #10 Volume 1 - 156 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Electronics Qty FY 2025 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items C4ISR 1 179.734 1 209.582 INTEGRATED COMMUNICATION NETWORK (ICAN / DDCN & IVCN) 1 84.682 1 94.945 ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (ECASS) 1 38.788 0 - SHIP SELF DEFENSE SYSTEM (SSDS) MK2 MOD 1E 1 27.289 1 46.529 AN/SPN-50(V)1 - AIR TRAFFIC CONTROL RADAR 1 14.654 1 16.459 AN/SPN-46 OVERHAUL/UPGRADE 1 9.270 1 11.539 SATELLITE SIGNAL LANDING SYSTEM (SSLS) 1 10.902 0 4.559 AN/USG-2B - COOPERATIVE ENGAGEMENT CAPABILITY (CEC) 1 9.763 1 12.479 AN/SPN-41 REFURBISHMENT 1 5.606 1 4.092 UNMANNED AVIATION WARFARE CENTER (UAWC) 0 - 1 58.763 P-35 Items Subtotal 380.688 458.947 Major Items AN/UPX-29 - IDENTIFICATION FRIEND OR FOE (IFF) INTERROGATOR SET 1 5.761 1 5.330 NAVAL STRIKE WARFARE PLANNING CENTER (NSWPC) 1 7.221 1 8.617 COMMON MUNITIONS & BIT/REPROGRAMMING (CMBRE) MAGAZINE OPERATIONS (MAGOPS) 1 5.943 1 4.688 AN/SYY-1 - AIR TRAFFIC CONTROL SYSTEM 1 4.190 1 Major Items Subtotal 1.943 23.115 20.578 Other Cost Elements 15.267 10.710 Other Cost Elements Subtotal TEST & CERTIFICATIONS, MISCELLANEOUS GFE 15.267 10.710 Total Electronics 419.070 490.235 Remarks: AN/UPX-29 - IDENTIFICATION FRIEND OR FOE (IFF) INTERROGATOR SET: CVN 74 cost increase is due to integration and installation delays. NAVAL STRIKE WARFARE PLANNING CENTER (NSWPC): CVN 74 increase is a result of the addition of the Strike Warfare Commander "Papa" Watch Station to the NSWPC work scope and Theater Mission Planning Center SW installation. COMMON MUNITIONS & BIT/REPROGRAMMING (CMBRE) MAGAZINE OPERATIONS (MAGOPS): CVN 74 increase due to unforeseen installation complications and delays. AN/SYY-1 - AIR TRAFFIC CONTROL SYSTEM: CVN 74 increase is due to delay in installation efforts resulting from delays in adjacent work. CVN 74 RCOH Other Cost Elements includes ten unlisted systems, each under $1 million in major hardware requirement. Revised to reflect actual incurred costs. CVN 75 RCOH Other Cost Elements includes six unlisted systems, each under $1 million in major hardware requirement. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 7 of 34 P-1 Line #10 Volume 1 - 157 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Hull, Mechanical, and Electrical (HM&E) Qty FY 2025 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items LOW PRESSURE AIR PLANT (LPAP) 1 6.366 0 0.606 VSA O2 GENERATOR 1 4.864 0 0.560 P-35 Items Subtotal 11.230 1.166 Major Items FOOD SERVICE EQUIPMENT (FSE) 25.595 31.433 NODE ROOM INSTALL 1 19.468 1 - OPERATOR BALLISTIC PROTECTION FOR CREW SERVED WEAPONS STATIONS 1 6.900 1 8.488 1 20.924 1 13.438 PASSIVE COUNTER MEASURE SYSTEM (PCMS) COMBAT SYSTEMS SUPPORT CENTER (CSSC) RIPOUT/INSTALL 9.411 CARRIER INTELLIGENCE CENTER (CVIC) RIPOUT/INSTALL - 15.362 5.668 MODULAR REFRIGERATION UNIT (MRU) 1 2.607 1 1.904 MEDICAL AND DENTAL SUITE 1 2.351 1 2.485 DECK EDGE DOOR 1 1.779 1 2.813 HANGAR DIVISION DOORS (HDD) 1 1.246 1 1.385 AIRCRAFT ELEVATOR (ACE) 1 0.098 1 Major Items Subtotal 2.018 105.741 69.632 ENGINEERING, TEST & CERTIFICATION 98.276 86.392 MISCELLANEOUS GOVERNMENT FURNISHED EQUIPMENT (GFE) 34.729 38.842 Other Cost Elements Subtotal 133.005 125.234 Total Hull, Mechanical, and Electrical (HM&E) 249.976 196.032 Other Cost Elements Remarks: FOOD SERVICE EQUIPMENT (FSE): CVN 74 cost increase is due to identification of unplanned decking work scope. NODE ROOM INSTALL: CVN 74 increase due to transition of infrastructure work scope as a result initial contractor's poor performance. Transition to new contactor required rescoping of remaining effort, significant corrective rework, and material procurements. Impacts were experienced by multiple C4I tasks, including indirect impacts due to resultant space availability constraints. CVN 75 decrease due to work scope was transitioned from C4I to shipbuilder. OPERATOR BALLISTIC PROTECTION FOR CREW SERVED WEAPONS STATIONS: CVN 74 revised to reflect a reduction due to actual incurred costs. PASSIVE COUNTER MEASURE SYSTEM (PCMS): CVN 74 cost increase a result of higher than estimated installation contract total and mitigation efforts associated with RCOH schedule slip. The procurement and installation effort will be performed by the shipbuilder for CVN 75. The requirement was previously performed by the government in prior RCOH availabilities. This is not a savings, and the shipbuilder's cost is accounted for in Basic Construction/Conversion. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 8 of 34 P-1 Line #10 Volume 1 - 158 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 COMBAT SYSTEMS SUPPORT CENTER (CSSC) RIPOUT/INSTALL: CVN 74 cost increase due to transition of infrastructure work scope as a result initial contractor's poor performance. Transition to new contactor required rescoping of remaining effort, significant corrective rework, and material procurements. Impacts were experienced by multiple C4I tasks, including indirect impacts due to resultant space availability constraints. CVN 75 cost decrease is due to realized hardware cost savings. CARRIER INTELLIGENCE CENTER (CVIC) RIPOUT/INSTALL: CVN 74 cost increase is due to transition of infrastructure work scope as a result initial contractor's poor performance. Transition to new contactor required rescoping of remaining effort, significant corrective rework, and material procurements. Impacts were experienced by multiple C4I tasks, including indirect impacts due to resultant space availability constraints. DECK EDGE DOOR: CVN 75 increase is due to Equipment Refresh/Obsolescence increases for internal EMI testing. AIRCRAFT ELEVATOR (ACE): CVN 74 decrease is due to adjustment to align with actual costs. ENGINEERING, TEST & CERTIFICATION: CVN 75 increase primary due to requirement for additional engineering services. MISCELLANEOUS GOVERNMENT FURNISHED EQUIPMENT (GFE): The CVN 74 RCOH includes eighteen unlisted systems, each under $1 million in major hardware requirement. Revised to reflect actual incurred costs. The CVN 75 RCOH includes sixteen unlisted systems, each under $1 million in major hardware requirement. The most significant difference between CVN 74 and CVN 75 is the re-categorization of Habitability Program Management and OSIC (On-site Installation Coordinator) efforts from Basic Construction/Conversion for CVN 74 to HM&E for CVN 75. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 9 of 34 P-1 Line #10 Volume 1 - 159 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Ordnance Qty FY 2025 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items ENTERPRISE AIR SURVEILLANCE RADAR (EASR) 1 56.957 1 62.130 AVIATION EQUIPMENT & SUPPORT 1 55.481 1 97.913 CIWS/RAM DEFENSE CAPABILITY (CRDC) BLOCK 1 1 27.697 1 35.121 NATO SEASPARROW SURFACE MISSILE SYSTEM (NSSMS) 1 25.947 1 36.655 SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 1 17.379 0 - MK 38 MOD 3 GUN SYSTEM 1 9.998 1 6.185 SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 - CLOSE IN WEAPON SYSTEM (CIWS) BLOCK 1B P-35 Items Subtotal 176.013 1.404 18.822 194.863 432.839 Major Items COMBAT DIRECTION CENTER (CDC)/FLAG RIPOUT/INSTALL 1 30.794 1 37.975 AN/SPS-73 NEXT GENERATION SURFACE SEARCH RADAR (NGSSR) 1 4.176 1 7.555 RAM GUIDED MISSILE LAUNCHING SYSTEM 1 3.329 1 3.619 AN/SQQ-34C - CARRIER TACTICAL SUPPORT CENTER 1 3.074 1 3.735 RADAR DATA DISTRIBUTION SYSTEM (RDDS) 0 - 1 Major Items Subtotal 4.611 41.373 57.495 36.272 29.948 Other Cost Elements TEST & CERTIFICATIONS, MISCELLANEOUS GFE Other Cost Elements Subtotal 36.272 29.948 Total Ordnance 272.508 520.282 Remarks: COMBAT DIRECTION CENTER (CDC)/FLAG RIPOUT/INSTALL: CVN 74 decrease is due to adjustment to align with actual costs. AN/SPS-73 NEXT GENERATION SURFACE SEARCH RADAR (NGSSR): CVN 75 cost increase is primarily due to revised hardware procurement costs as a result of negotiated follow-on option year contract award. NATO SEASPARROW SURFACE MISSILE SYSTEM (NSSMS): CVN 75 upgraded to a Mod 17 configuration. The legacy equipment, including directors, launcher, and associated pedestals will be overhauled as a part of this process. AN/SQQ-34C - CARRIER TACTICAL SUPPORT CENTER: CVN 74 increase is due to discovery of required additional work scope and hardware procurement during installation. The CVN 75 decrease is due to realized savings in production engineering and software licensing fees. RADAR DATA DISTRIBUTION SYSTEM (RDDS): CVN 75 increase is due to the addition of cybersecurity requirements. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 10 of 34 P-1 Line #10 Volume 1 - 160 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls CVN 74 RCOH Other Cost Elements includes six unlisted systems, each under $1 million in major hardware requirement. Revised to reflect actual incurred costs. CVN 75 RCOH Other Cost Elements includes four unlisted systems, each under $1 million in major hardware requirement. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 11 of 34 P-1 Line #10 Volume 1 - 161 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: C4ISR PARM Code: NAVWAR PMW 750 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) Total Cost (Each) 1 63.786 ($ M) 1 88.730 Ancillary Equipment 0.002 0.796 Technical Data and Documentation 0.524 0.462 Spares 2.683 3.623 System Engineering 4.492 3.903 Technical Engineering Services 93.112 91.399 Other Costs 15.135 Total 1 20.669 179.734 1 209.582 Description: Provides an integrated communications infrastructure to support both tactical and non-tactical applications in all warfare and support areas, an improved shipboard RF distribution system and multiband antennas, and capabilities for the control and monitoring of RF assets introducing network automation and provide interoperable communications for joint operations. It will interconnect forces of the Battle Group (BG)/ Amphibious Readiness Group (ARG) and connects the BG/ARG with expeditionary forces and the Commander-in-Chief Command Complex (CCC) ashore crossing all available media including Ultra High Frequency (UHF), Super High Frequency (SHF), Extremely High Frequency (EHF), commercial satellite links, and new medium-to-high data rate HF and UHF line of sight (LOS) links. C4ISR includes RCS, weather, navigational, signal exploitation, and command and control equipment. Contract Data: Quantity Unit Cost Various 1 63.786 Various 1 88.730 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Various Various Various FY 2025 CVN 75 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 0 0 Required Award Date Apr 2028 FY 2025 CVN 75 Nov 2031 0 0 Nov 2031 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Comprised of 36 discretely funded line items. Net increase of $10.419M is majority due to transition of C4I infrastructure work scope as a result initial contractor's poor performance. Transition to new contactor required rescoping of remaining effort, significant corrective rework, and material procurements. Impacts were experienced by multiple C4I tasks, including indirect impacts due to Radio Communication System (RCS) due to space availability and disruption. Lesser increases are due to multiple systems requiring previously unplanned FY26 support to complete installation and test tasking as a result of the RCOH slip. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 12 of 34 P-1 Line #10 Volume 1 - 162 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Equipment Item: C4ISR PARM Code: NAVWAR PMW 750 CVN 75 RCOH - Comprised of 35 discretely funded line items. Major cost driver of net increase of $3.984M include the transition to NCGS-N Technical EDGE EQPT (DTEE) rack from NCGS-N Inc. 2 rack, increases to NIWC labor rates, higher than anticipated hardware vendor proposal costs on post COVID follow on contracts, and additional technical engineering services requirements. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 13 of 34 P-1 Line #10 Volume 1 - 163 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: INTEGRATED COMMUNICATION NETWORK (ICAN / DDCN & IVCN) PARM Code: NAVSEA 05H3, NSWC Philadelphia FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 24.036 ($ M) 1 34.259 Ancillary Equipment 0.712 0.620 Technical Data and Documentation 0.539 0.810 Spares 0.072 0.433 System Engineering 8.854 10.717 Technical Engineering Services 44.392 36.369 Other Costs 6.077 Total 1 11.737 84.682 1 94.945 Description: The Integrated Voice Communications Network consists of the following systems: An Integrated Voice Network (IVN) which provides the ship's dial telephone capability in support of Internal Command and Control Communications. In addition, IVN provides interface connectivity to other onboard systems such as Announcing Systems, Sound Powered Circuits, Secure / Non Secure off-ship Communications, Shipboard Air Traffic Control Communications (SATCC) and Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA). The Machinery Control Monitoring System (MCMS) controls and monitors approximately 3500 machinery signals for various HM&E auxiliary systems (e.g. JP5, firemain, IC/SM panels) for aircraft carriers. It utilizes the Machinery Control Network (MCN) for signals. The MCN is the core network that provides communication services and transport for the MCMS system and part of the backbone that rides over the Fiber Optic Cable Plant (FOCP). It consists of five network switches, associated racks, and cabling. The Navigation Critical Distribution System (NAVCRIT) is a switched network providing communication services and transport for the NAV Standard Message, which is originated in the Naval Sensor System Interface (NAVSSI) system. The NAVCRIT Distribution consists of three backbone switches and eight I/0 controllers to convert digital NAV data for analog outputs. It will use the FOCP to the maximum extent for connectivity. The Ship Control System (SCS) provides control and display of rudder position, Engine and Propeller Order Telegraph functions. SCS provides data for heading, speed, and rudder angles through NAVCRIT Network from NAVSSI. The SCS interfaces to an Electronic Chart Display Information System. Contract Data: Quantity Unit Cost Various 1 24.036 Various 1 34.259 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Various Various Various FY 2025 CVN 75 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 0 0 Required Award Date Apr 2028 FY 2025 CVN 75 Nov 2031 0 0 Nov 2031 Competition/Second Source Initiatives: N/A Remarks: LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 14 of 34 P-1 Line #10 Volume 1 - 164 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Equipment Item: INTEGRATED COMMUNICATION NETWORK (ICAN / DDCN & IVCN) PARM Code: NAVSEA 05H3, NSWC Philadelphia CVN 74 RCOH - Revised to reflect a reduction due to actual incurred costs. CVN 75 RCOH - Major cost driver to increase of $9.685M include the addition of omitted On-Site Installation Coordinator (OSIC) support for Shipboard Broadcast System (SBS), higher than anticipated hardware vendor costs, and adjustments made for increased Government labor rates. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 15 of 34 P-1 Line #10 Volume 1 - 165 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (ECASS) PARM Code: NAVAIR PMA 260 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Qty ($ M) Major Hardware 1 ($ M) 36.024 Technical Engineering Services 2.478 Other Costs 0.286 Total Total Cost (Each) 1 0 - 38.788 0 - Description: The Electronic Consolidated Automated Support System (eCASS) provides repair capability for aircraft instruments, components ("black boxes"), subcomponents (e.g. circuit cards), avionics and missile systems for all current deployable aircraft, F/A-18 ATFLIR (Forward Looking Infrared Receiver) and ALQ-99 (electronic jamming) systems, as well as new and future aircraft such as E-2D and F-35C. The eCASS replaces the obsolete Consolidated Automated Support System (CASS) that formerly provided this support. The eCASS suite provides expeditious, on-site repair capability for more than 1,100 different components, without which parts support for the ship's AIRWING (which routinely operates at great distances from logistics supply points) would be degraded to the point that it would result in increased support costs and negatively affect mission accomplishment, combat readiness, and required sortie generation rates. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Lockheed Martin SS/FFP Nov 2021 Option Quantity Unit Cost 1 36.024 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 39 12 Jan 2024 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect a reduction due to actual incurred costs. CVN 75 RCOH - eCASS was installed on CVN 75 during a previous modernization & maintenance availability. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 16 of 34 P-1 Line #10 Volume 1 - 166 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SHIP SELF DEFENSE SYSTEM (SSDS) MK2 MOD 1E PARM Code: NAVSEA PEO IWS 10 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 10.475 ($ M) 1 12.606 Technical Data and Documentation 0.466 0.548 Spares 0.518 0.405 System Engineering 4.225 5.870 Technical Engineering Services 7.367 10.503 Other Costs 4.238 Total 1 16.597 27.289 1 46.529 Description: The Ship Self Defense System (SSDS) MK2 provides primary support for force/own ship combat systems control and enhanced self-defense capabilities. SSDS is the heart of the Combat System integrating sensors, weapons systems, data links, and command and control elements into a unified Combat System. Contract Data: Quantity Unit Cost Various 1 10.475 Various 1 12.606 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Lockheed Martin Various Sep 2020 FY 2025 CVN 75 TBD Various Jun 2026 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 42 24 Required Award Date Oct 2022 FY 2025 CVN 75 Nov 2031 28 18 Jan 2028 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect an increase due to actual incurred costs. CVN 75 - As compared to CVN 74, the Other Cost increase is primarily driven by additional software & licensing and land-based testing requirements. CVN 75 will receive a new configuration of the MK Mod X. Revised to reflect an overall reduction due to actual incurred costs. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 17 of 34 P-1 Line #10 Volume 1 - 167 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPN-50(V)1 - AIR TRAFFIC CONTROL RADAR PARM Code: NAVAIR PMA 213 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 10.706 1 12.216 Technical Data and Documentation 0.113 0.142 Spares 0.843 0.138 System Engineering 0.490 0.675 Technical Engineering Services 2.327 2.723 Other Costs 0.175 Total 1 0.565 14.654 1 16.459 Description: Digital radar system capable of modern radar processing to improve target detection and track in the presence of competing clutter. C-band radar alleviating operational congestion of new shipboard S-band radars and restrictions caused by increasing spectrum encroachment and National Broadband Plan. Contract Data: Quantity Unit Cost New 1 10.706 New 1 12.216 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 SAAB SS/FPIF Jul 2020 FY 2025 CVN 75 SAAB SS/FPIF Feb 2026 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 38 22 Required Award Date Apr 2023 FY 2025 CVN 75 Nov 2031 24 24 Nov 2027 Competition/Second Source Initiatives: N/A LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 18 of 34 P-1 Line #10 Volume 1 - 168 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPN-46 OVERHAUL/UPGRADE PARM Code: NAVAIR PMA 213 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 5.074 ($ M) 1 10.323 System Engineering 0.617 0.330 Technical Engineering Services 3.335 0.710 Other Costs 0.244 Total 1 0.176 9.270 1 11.539 Description: The AN/SPN-46 Automatic Carrier Landing System (ACLS) is a precision approach landing system (PALS) which provides electronic guidance to carrier-based aircraft and allows them to land in all-weather conditions with no limitations due to low ceiling or restricted visibility. AN/SPN-46 is a fully automated, all-weather approach landing aid for carrier aircraft that enhances safety of flight during recovery, enables the execution of all-weather air combat operations, and is required to achieve full air traffic control certification following RCOH. AN/SPN-46 is required to be removed during the RCOH to prevent damage and allow for major infrastructure recapitalization and reconfiguration of the ship's island, mast, and tower. Contract Data: Quantity Unit Cost Oct 2020 1 5.074 Dec 2024 1 10.323 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 74 NAWC Aircraft Division WR FY 2025 CVN 75 NAWC Aircraft Division WR New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 27 38 Nov 2022 FY 2025 CVN 75 Nov 2031 38 12 Sep 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Net cost increase ($0.193M) due to identification of unplanned work scope based on existing equipment condition. CVN 75 RCOH - Upgrade as compared to CVN 74 includes an updated & upgraded pedestal to provide enhanced reliability and availability, which accounts for the hardware increase from CVN 74. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 19 of 34 P-1 Line #10 Volume 1 - 169 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SATELLITE SIGNAL LANDING SYSTEM (SSLS) PARM Code: NAVAIR PMA 213 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 7.797 0 - Spares 1.288 - System Engineering 0.456 0.636 Technical Engineering Services 1.296 1.406 Other Costs 0.065 Total 1 2.517 10.902 0 4.559 Description: The Satellite Signal Landing System (SSLS), formerly known as Joint Precision Approach and Landing System (JPALS), is the future precision approach and landing system which will be the primary landing system for the Joint Strike Fighter (F-35B/F-35C), Unmanned Carrier Aviation Air System (MQ-25A), and future aircraft platforms onboard CVNs and LHA/LHD type ships. JPALS is the Navy certified sea-based system to have the capabilities necessary to provide ship range/bearing for JPALS-equipped aircraft operating within 200NM; provide air traffic control surveillance of JPALS-equipped aircraft via secure, twoway data link with the ship; and support auto-land functionality for the F-35C, MQ-25A, and future platforms to CVNs. JPALS is critical for MQ-25A as currently no secondary landing system exists for MQ-25A operations at sea. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Raytheon SS/FFP Oct 2020 Option Quantity Unit Cost 1 7.797 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 48 17 Nov 2022 Competition/Second Source Initiatives: N/A Remarks: CVN 75 RCOH - Planned to use previously procured equipment. No additional hardware procurement is required. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 20 of 34 P-1 Line #10 Volume 1 - 170 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/USG-2B - COOPERATIVE ENGAGEMENT CAPABILITY (CEC) PARM Code: NAVSEA PEO IWS 6.0 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.531 1 5.392 Technical Data and Documentation 0.139 - Spares 0.453 0.821 System Engineering 0.546 0.592 Technical Engineering Services 3.624 4.015 Other Costs 1.470 Total 1 1.659 9.763 1 12.479 Description: AN/USG-2B - Cooperative Engagement Capability (CEC) provides Battle Force Anti-Air Warfare (AAW) capability by coordinating all force AAW sensors into a single real time, fire control quality composite track picture. CEC distributes sensor measurement data from each Cooperating Unit (CU) to all other CUs. Each CU has a Data Distribution System (DDS) and a Cooperative Engagement Processor (CEP). The DDS encodes and distributes ownship sensor and engagement data to other CUs, and receives and decodes other CU's data. The CEP processes ownship data and DDS supplied remote sensor and weapon data needed to provide the common air picture. Contract Data: Quantity Unit Cost Option 1 3.531 Option 1 5.392 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Leonardo DRS C/FFP May 2020 FY 2025 CVN 75 L3 Harris C/FFP Feb 2026 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 52 18 Required Award Date Jun 2022 FY 2025 CVN 75 Nov 2031 30 24 May 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect a increase due to actual incurred costs. CVN 75 RCOH - Hardware cost increases above inflation as compared to CVN 74 are for additional replenishment of Installation and Checkout (INCO) kits. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 21 of 34 P-1 Line #10 Volume 1 - 171 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPN-41 REFURBISHMENT PARM Code: NAVAIR PMA 213 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 3.427 ($ M) 1 1.816 System Engineering 0.353 0.348 Technical Engineering Services 1.570 1.711 Other Costs 0.256 Total 1 0.217 5.606 1 4.092 Description: The AN/SPN-41 Aircraft Approach Control Transmitting Set provides all-weather instrument approach guidance from the ship to the aircraft. It is used as the ship's Instrument Landing System (ILS) and Monitor to provide azimuth and elevation alignment information to landing aircraft on final approach to the deck. It also serves as an independent monitor of other shipboard landing systems for the pilot as well as providing a backup landing guidance option. AN/SPN-41 enhances safety of flight during recovery, enables the execution of all-weather air combat operations, and is required to achieve full air traffic control certification following RCOH. AN/SPN-41 is required to be removed during the RCOH to prevent damage and allow for major infrastructure recapitalization and reconfiguration of the ship's island, mast, and tower. Contract Data: Quantity Unit Cost Dec 2020 1 3.427 Dec 2024 1 1.816 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2020 CVN 74 NAWC Aircraft Division WR FY 2025 CVN 75 NAWC Aircraft Division WR New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 39 24 Jan 2023 FY 2025 CVN 75 Nov 2031 25 30 Apr 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect an increase due to actual incurred costs. CVN 75 RCOH - SPN-41B was previously upgraded on CVN 75 during a previous availability. CVN 74 received a complete upgrade from SPN-41 to SPN-41B during its RCOH. CVN 75 funds support the AIT removal, replacement parts, overhaul, testing, installation, and management. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 22 of 34 P-1 Line #10 Volume 1 - 172 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: UNMANNED AVIATION WARFARE CENTER (UAWC) PARM Code: NAVAIR PMA 268 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) ($ M) - 1 31.263 Technical Data and Documentation - 0.116 Technical Engineering Services - 26.407 Other Costs - Total 0 0.977 - 1 58.763 Description: The Unmanned Aviation Warfare Center (UAWC) will be the location from which the Air Vehicle Pilots (AVPs) control the MQ-25 unmanned aircraft using existing carrier communication systems and networks. MQ-25 payload sensor data will also be distributed throughout the carrier from the UAWC. The control station, also called the MD-5, consists of the following components: the Multi-Domain Control Capability (MDCX) which will be 7-9 AVP consoles and 3-4 server racks, the Video Management System (VidMS) and Air Traffic Control (ATC) picture for situational awareness, the Unmanned Carrier Aviation Transport System (UTS) for integration with ship networks and generation of the mission plan for the MQ-25, the ARC-210 Radio Communication System (RCS), the Digital Modular Radio (DMR), and the integrated communication system half-rack that allows AVPs access to existing ship radios. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 CVN 75 Lockheed Martin TBD Dec 2025 New Quantity Unit Cost 1 31.263 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 CVN 75 Nov 2031 30 24 May 2027 Competition/Second Source Initiatives: N/A Remarks: UAWC modernization creates the spaces onboard CVN 75 to operate and maintain the MQ-25A (Mission/Recovery Tanking and ISR (Intelligence, Surveillance, and Reconnaissance)). The modernized spaces and major hardware installations integrate with existing command, control, communications, computers, and intelligence (C4I) systems, and modify carrier's infrastructure throughout the ship. Technical engineering services include installation of equipment as well as infrastructure work performed by the government. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 23 of 34 P-1 Line #10 Volume 1 - 173 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: LOW PRESSURE AIR PLANT (LPAP) PARM Code: NSWC Philadelphia FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.726 0 - Ancillary Equipment 0.194 Spares 0.018 - System Engineering 0.131 0.286 Technical Engineering Services 0.204 - Other Costs 0.093 0.300 Total 1 0.020 6.366 0 0.606 Description: Remove three Ship Service Air Compressors (SSAC), four Control Air Compressors, and associated dryers from two machinery rooms and two reactor rooms. Install nine MARC 350 Low Pressure Air Plants (LPAPs) to serve both ship service air and control air systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 RIX Industries SS/FFP Sep 2019 Option Quantity Unit Cost 1 5.726 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 62 16 Oct 2021 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect an increase due to actual incurred costs. CVN 75 RCOH - This procurement & installation effort will be performed by the shipbuilder for CVN 75. This requirement was previously performed by the government in prior RCOH availabilities. This is not a savings and the shipbuilder's cost is accounted in the Basic Construction/Conversion line for LPAP on CVN 75 whereas the government cost on CVN 74 is accounted in HM&E. Cost increase of $.0506M due to identification of required internal equipment modification procurement and installation. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 24 of 34 P-1 Line #10 Volume 1 - 174 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: VSA O2 GENERATOR PARM Code: NSWC Philadelphia FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.557 0 - Ancillary Equipment 0.194 Spares 0.055 - System Engineering 0.651 0.395 Technical Engineering Services 0.123 0.115 Other Costs 0.284 Total 1 - 0.050 4.864 0 0.560 Description: One liquid oxygen generating and storage plant with associated support equipment; one gaseous nitrogen generator with associated storage flasks. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Pacific Consolidated Industries SS/FFP Jan 2020 Option Quantity Unit Cost 1 3.557 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 50 24 Feb 2022 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Cost increase of $0.088M due to addition of INCO spares. CVN 75 RCOH - This procurement & installation effort will be performed by the shipbuilder for CVN 75. This requirement was previously performed by the government in prior RCOH availabilities. This is not a savings and the shipbuilder's cost is accounted in the Basic Construction/Conversion line for VSA O2 Generator on CVN 75 whereas the government cost on CVN 74 is accounted in HM&E. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 25 of 34 P-1 Line #10 Volume 1 - 175 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ENTERPRISE AIR SURVEILLANCE RADAR (EASR) PARM Code: NAVSEA PEO IWS 2RI FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Qty ($ M) Major Hardware 1 Total Cost (Each) ($ M) 27.331 1 19.283 Ancillary Equipment 0.233 0.081 Spares 2.024 2.497 System Engineering 5.330 7.453 Technical Engineering Services 17.557 26.363 Other Costs 4.482 Total 1 6.453 56.957 1 62.130 Description: Enterprise Air Surveillance Radar (EASR) is the next generation S-band air search radar with 3-D search capability supporting: Anti-Air Warfare, Anti-Surface Warfare, Air Traffic Control. Contract Data: Quantity Unit Cost Option 1 27.331 Option 1 19.283 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Raytheon C/CPIF Jul 2020 FY 2025 CVN 75 Raytheon C/CPIF Mar 2023 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 44 24 Aug 2022 FY 2025 CVN 75 Nov 2031 30 26 Mar 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 75 RCOH - Cost increase of $13.548M due to cost revisions based on first-of-hull actuals on CVN 74. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 26 of 34 P-1 Line #10 Volume 1 - 176 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AVIATION EQUIPMENT & SUPPORT PARM Code: NAVAIR PMA 251 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 30.932 ($ M) 1 67.461 Ancillary Equipment 0.061 0.134 Technical Data and Documentation 0.095 0.059 Spares 0.198 0.587 System Engineering 6.206 5.764 Technical Engineering Services 10.195 11.720 Other Costs 7.794 Total 1 12.188 55.481 1 97.913 Description: Provides procurement, engineering and logistics support for launch and recovery equipment (includes overhaul/replacement of catapult launch valves and arresting gear engines), ADMACS (Aviation Data Management and Control System Phase II upgrade; includes Cyber Security requirement and future aircraft ready), Moriah Wind System, ILARTS (Integrated Launch and Recovery TV Surveillance System; includes Technical Refresh Service Change to mitigate obsolescence issues), mission pods, Jet Blast Deflectors (includes Service Change to provide side panel cooling to meet JSF requirements), aviation maintenance facility, weapons compatibility, aircraft spotting, aviation servicing facilities, Landing Signal Officer Display System (LSODS; includes ADMACS interfacing and Cyber Security updates), Long Range Lineup System (LRLS), Improved Fresnel Lens Optical Landing System (IFLOLS; includes Phase IV upgrade), Manually Operated Visual Landing Aid System (MOVLAS) and Flight Deck Lighting and Marking and Lighting. All of these systems are required to be repaired, updated, overhauled as required and tested during RCOH to attain final Flight Deck Certification authorizing launch and recovery of USN aircraft. Contract Data: Quantity Unit Cost Various 1 30.932 Various 1 67.461 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Various Various Various FY 2025 CVN 75 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2020 CVN 74 Apr 2028 0 0 Required Award Date Apr 2028 FY 2025 CVN 75 Nov 2031 0 0 Nov 2031 Competition/Second Source Initiatives: N/A Remarks: The Aviation Equipment and Support is inclusive of 19 individual systems. CVN 74 RCOH - Cost decrease of $2.189M primarily due to realized cost savings in Launcher low loss launch valve refurbishment and procurement. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 27 of 34 P-1 Line #10 Volume 1 - 177 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Equipment Item: AVIATION EQUIPMENT & SUPPORT PARM Code: NAVAIR PMA 251 The Aviation Equipment and Support is inclusive of 17 individual systems. CVN 75 RCOH - Cost increase as compared to CVN 74, accounting for inflation, is primarily driven by a significant increase in scope of required Recovery equipment overhaul and replacement as a result of pre-RCOH condition assessment. Cost increase of $6.942M is primarily due to updated ARC hardware overhaul based on actuals following prototype procurement. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 28 of 34 P-1 Line #10 Volume 1 - 178 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CIWS/RAM DEFENSE CAPABILITY (CRDC) BLOCK 1 PARM Code: NAVSEA PEO IWS 3G FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 20.193 1 21.582 Ancillary Equipment - 0.613 Technical Data and Documentation - 0.081 Spares - 1.360 System Engineering 0.595 1.301 Technical Engineering Services 6.722 7.986 Other Costs 0.187 Total 1 2.198 27.697 1 35.121 Description: Close-In Weapon System (CIWS)/Rolling Airframe Missile (RAM) Defense Capability (CRDC) is a high fire rate gun weapon system that automatically acquires, tracks, and destroys threats. Active radars, supporting platforms, below deck equipment, and interfaces them to CIWS for Quick Reaction Capability (QRC). The QRC CRDC Block 1 (MK15 MOD 40) requires infrastructure and installation of three new sensors. Sensors will be mounted topside with associated support equipment below decks. Contract Data: Quantity Unit Cost New 1 20.193 New 1 21.582 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Raytheon C/FFP Dec 2020 FY 2025 CVN 75 Raytheon C/FFP Mar 2024 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 38 24 Feb 2023 FY 2025 CVN 75 Nov 2031 24 33 Feb 2027 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect an increase due to actual incurred costs. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 29 of 34 P-1 Line #10 Volume 1 - 179 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: NATO SEASPARROW SURFACE MISSILE SYSTEM (NSSMS) PARM Code: NAVSEA PEO IWS 12 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 13.225 1 22.330 Ancillary Equipment 0.198 0.217 Spares 1.180 1.819 System Engineering 0.809 1.176 Technical Engineering Services 9.018 10.705 Other Costs 1.517 Total 1 0.408 25.947 1 36.655 Description: The NATO Seasparrow Surface Missile System (NSSMS) is a medium range self defense missile system capable of defeating near/mid-term air/surface threats. New NSSMS are no longer manufactured. All systems are refurbished and modernized. Contract Data: Quantity Unit Cost Option 1 13.225 Various 1 22.330 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Raytheon SS/FFP Nov 2020 FY 2025 CVN 75 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 33 31 Dec 2022 FY 2025 CVN 75 Nov 2031 0 0 Nov 2031 Competition/Second Source Initiatives: N/A Remarks: CVN 74 RCOH - Revised to reflect a reduction due to actual incurred costs. CVN 75 RCOH - Upgraded to a Mod 17 configuration. The legacy equipment, including directors, launcher, and associated pedestals will be overhauled as a part of this process. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 30 of 34 P-1 Line #10 Volume 1 - 180 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 PARM Code: NAVSEA PEO IWS 2E FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 10.182 0 - Ancillary Equipment 0.198 - Spares 0.391 - System Engineering 0.731 - Technical Engineering Services 4.814 - Other Costs 1.063 Total 1 - 17.379 0 - Description: Surface Electronic Warfare Improvement Program (SEWIP) Block 2 detects and classifies special signals not processed by other SLQ-32 receivers. SEWIP Block 2 provides enhanced Electronic Support (ES) capability with improved detection and accuracy to pace evolving threats through an upgraded ES antenna & receiver along with an open combat system interface. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 Lockheed Martin C/FFP Mar 2020 Option Quantity Unit Cost 1 10.182 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 43 29 Apr 2022 Competition/Second Source Initiatives: N/A Remarks: CVN 75 RCOH will receive Surface Electronic Warfare Improvement Program (SEWIP) Block 3. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 31 of 34 P-1 Line #10 Volume 1 - 181 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 38 MOD 3 GUN SYSTEM PARM Code: NAVSEA PEO IWS 3C FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.002 0 - Technical Data and Documentation 0.020 Spares 0.097 - - 0.060 Technical Engineering Services 4.829 6.060 Other Costs 0.050 System Engineering Total 1 0.025 0.040 9.998 0 6.185 Description: MK 38 Mod 3 Gun System is a 25mm stabilized gun with auto tracking and day/night capability that is also capable of interfacing with 7.62 mm MK 52 MOD 0 Coaxial gun. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2020 CVN 74 BAE Systems SS/FP Jun 2020 New Quantity Unit Cost 1 5.002 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2020 CVN 74 Apr 2028 51 18 Jul 2022 Competition/Second Source Initiatives: N/A Remarks: CVN 75 RCOH - Hardware requirements are fulfilled through refurbishment and conversion of mounts from decommissioning assets at greater cost than original production. MK 38 MOD 3 is no longer produced, future assets will be acquired from decommissioning assets resulting in a cost savings for CVN 75. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 32 of 34 P-1 Line #10 Volume 1 - 182 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 PARM Code: NAVSEA PEO IWS 2E FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) ($ M) - 1 135.543 Ancillary Equipment - 1.032 Spares - 3.084 System Engineering - 1.916 Technical Engineering Services - 8.131 Other Costs - 26.307 Total 0 - 1 176.013 Description: AN/SLQ-32(V)7 includes a SEWIP Block 3 transmitter, a SEWIP Block 2 receiver, and upgraded network centric and mission planning capabilities. The V7 system consists of a V6 system integrated with Block 3 capability equipment and additional electronic attack capabilities. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 CVN 75 Northrop Grumman C/FFP Sep 2025 Option Quantity Unit Cost 1 135.543 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 CVN 75 Nov 2031 43 24 Apr 2026 Competition/Second Source Initiatives: N/A Remarks: The funding increase stems from procuring hardware outside of the original planned PB26 multi-platform bulk purchase. These additional costs are necessary to install the SEWIP Block 3, AN/SLQ-32(V)7 system on CVN 75. This is a significant capability increase from the SEWIP Block 2, AN/SLQ-32(V)6 system. Costs in this P-35 exhibit include GFE and design and installation of four sponsons to accommodate the SEWIP Block 3 increased space and positioning requirements. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 33 of 34 P-1 Line #10 Volume 1 - 183 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CLOSE IN WEAPON SYSTEM (CIWS) BLOCK 1B PARM Code: NAVSEA PEO IWS 11 FY 2020 FY 2025 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) ($ M) - 1 15.206 Technical Data and Documentation - 0.056 Spares - 0.175 System Engineering 0.015 0.681 Technical Engineering Services 1.192 0.968 Other Costs 0.197 Total 0 1.736 1.404 1 18.822 Description: Phalanx MK15 Mod 22 (CIWS) provides an inner layer point defense capability against anti-ship cruise missiles (ASCMs), aircraft, and littoral warfare threats that have penetrated other fleet defenses. Phalanx is a high fire rate gun weapon system that automatically acquires, tracks, and destroys ASCMs, Helos, Aircraft, and all types of surface threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 CVN 75 Raytheon SS/FFP Jul 2024 New Quantity Unit Cost 1 15.206 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 CVN 75 Nov 2031 34 30 Sep 2025 Competition/Second Source Initiatives: None Remarks: CVN 75 RCOH - The quantity of mounts being procured/overhauled is decreasing, which is driving increasing unit costs on the production contract. Phalanx is being replaced on other SCN platforms, which reduces economic order quantity opportunities, and reduces the ability to spread non-hardware costs across multiple programs. CVN 75 RCOH SCN funding will fully fund the CIWS modernization as there are no longer other program funds to leverage as was done for CVN 73 and CVN 74 RCOHs. Imminent hardware contract will be jointly awarded with Air Force hardware requirements to achieve economies of scale. Revised to reflect a reduction due to actual incurred costs. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 34 of 34 P-1 Line #10 Volume 1 - 184 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 First System (2027) Award Date: October 2030 First System (2027) Completion Date: February 2035 Cost Elements Production Leadtime (Months) Interval Between Systems: 0 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) Advance Procurement Plans - Various - - 0.500 15.000 15.000 10.000 20.927 Basic (Ship) - Various - - 26.670 301.448 576.678 709.718 134.116 Basic (Parking Garages) - Various - - 0.000 3.200 3.200 3.200 - Basic (Multi-Use Facility) - Various - - 0.000 9.600 4.500 3.500 - Other - Various - - 0.500 1.000 1.000 1.000 1.200 Propulsion Equipment - Various - - 24.800 19.000 21.800 39.100 23.800 HM&E - Various - - 0.200 0.200 0.200 10.000 - Electronics - Various - - 0.200 0.500 25.000 50.000 0.404 Ordnance - Various - - 0.200 0.500 0.500 10.000 Total: Advance Procurement - - 53.070 350.448 647.878 836.518 180.447 - Total Advance Procurement/Obligation Authority - - 53.070 350.448 647.878 836.518 180.447 *Note: "When Required" is the number of months required before ship delivery. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 1 of 2 P-1 Line #11 Volume 1 - 185 === page 236 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 2086 / CVN Refueling Overhauls Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) Advance Procurement Plans - Various - Dec 2026 - 2031 0.500 Basic (Ship) - Various - Dec 2026 - 2031 26.670 Basic (Parking Garages) - Various - Dec 2026 - 2031 0.000 Basic (Multi-Use Facility) - Various - Dec 2026 - 2031 0.000 Other - Various - Dec 2026 - 2031 0.500 Propulsion Equipment - Various - Dec 2026 - 2031 24.800 HM&E - Various - Dec 2026 - 2031 0.200 Electronics - Various - Dec 2026 - 2031 0.200 Ordnance - Various - Dec 2026 - 2031 0.200 Total: Advance Procurement 53.070 Total Advance Procurement/Obligation Authority 53.070 Description: FY 2027 is the first of four years of advance procurement for CVN 76 RCOH. Full funding begins in FY 2031 with one year of subsequent full funding in FY 2032. FY 2027 advance procurement funding profile includes engineering support, technical support services, and GFI/GFE long-lead procurement to support RCOH execution start date. FY 2027 has activity primarily in Basic and Propulsion requirements. Plans: In FY 2027, will complete planning engineering support, shipchecks and shipcheck oversight, drawing development prior to executing the availability. Basic: FY 2027 is the first year of prime contractor advance planning, completion of critical planning products such as the integrated master schedule, technical support, engineering studies and advance procurement to support the replacement of all four Aircraft Elevators. Other: In FY 2027 is for Integrated Logistic and Administrative support required to support ship check and advance planning for the availability. Propulsion Equipment: FY 2027 is related to the advance procurement critical Propulsion components. HM&E: FY 2027 is the first year for GFI/GFE of long-lead procurement and technical services for hull, mechanical and electrical (HM&E) systems. Electronics: FY 2027 is the first year for GFI/GFE long lead-time procurement and technical planning for modernization of combat systems, interior communications, and C4I systems. Ordnance: FY 2027 is the first year for GFI/GFE long lead-time procurement and technical planning for modernization of radars and weapons systems. *Note: "When Required" is the number of months required before ship delivery. LI 2086 - CVN Refueling Overhauls Navy UNCLASSIFIED Page 2 of 2 P-1 Line #11 Volume 1 - 186 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2119 / DDG 1000 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Prior Years 3 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 3 Total Gross/Weapon System Cost ($ in Millions) 13,923.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 13,923.400 Less PY Advance Procurement ($ in Millions) 1,160.113 - - - - - - - - - - 1,160.113 8,671.513 - - - - - - - - - - 8,671.513 4,091.774 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 4,091.774 8,491.539 61.100 52.358 66.516 - 66.516 - - - - - 8,671.513 Full Funding TOA ($ in Millions) 12,583.313 61.100 52.358 66.516 - 66.516 - - - - - 12,763.287 Plus CY Advance Procurement ($ in Millions) 1,160.113 - - - - - - - - - - 1,160.113 Total Obligation Authority ($ in Millions) 13,743.426 61.100 52.358 66.516 0.000 66.516 0.000 0.000 0.000 0.000 - 13,923.400 Less Subsequent Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 513.214 - 0.009 - - - - - - - - 513.223 Total ($ in Millions) 14,256.640 61.100 52.367 66.516 - 66.516 - - - - - 14,436.623 Gross/Weapon System Unit Cost ($ in Millions) 4,641.133 - - - - - - - - - - 4,641.133 Description: DDG 1000, a multi-mission surface combatant, will serve as a versatile asset in the context of future Naval Strategy. Armed with an array of weapons, DDG 1000 will provide the Joint Force Commander with precision strike and volume fires. Designed with sustainable payload, multi-spectral stealth and optimal manning, DDG 1000 will take the fight to the enemy with unprecedented striking power. The program continues to integrate the Conventional Prompt Strike (CPS) weapons system on the DDG 1000 Class. CPS installation on the lead ship by Q1 FY25 and all three ships in the class by Q4 FY28. DDG 1000 will be the first maritime platform to integrate the CPS weapons system. This naval surface hypersonic strike capability will conduct independent forward deployed operations and prosecute deepinland, time-critical, soft and medium-hardened targets in a contested environment. The CPS capability, combined with the low observable characteristics of the ZUMWALT platform, creates a uniquely lethal and survivable naval surface platform. ZUMWALT Class enhances U.S. conventional power projection by providing an independent forward deployed strike platform, with longer range, shorter time of flight, and higher survivability against enemy defenses compared to current capabilities. CPS integration on Lyndon B. Johnson (DDG 1002) will occur during new construction, prior to the ship's arrival in homeport and prior to installation of CPS on DDG 1001. Full CPS operational capability on ZUMWALT Class is achieved when CPS is installed on all three ships and they are turned over for Fleet operations. DDG 1000 and DDG 1001 are delivered/commissioned ships. The CPS installations for these ships is budgeted with Other Procurement, Navy (OPN LI 0947) funding. DDG 1002 CPS installation is budgeted in Shipbuilding and Conversion, Navy funding. LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 1 of 25 P-1 Line #12 Volume 1 - 187 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2119 / DDG 1000 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Systems: DDG 610 ft 80.7 ft 15,742 TONS 27.6 ft Electronics -EXTERIOR COMMUNICATIONS (EXCOMMS) -MULTI FUNCTION RADAR (MFR) -TOTAL SHIP COMPUTING ENVIRONMENT (TSCE) -DDG 1002 TSCE MODERNIZATION DDG 1002 Hull, Mechanical, and Electrical (HM&E) -MAIN TURBINE GENERATOR (MTG) Ordnance -ADVANCED GUN SYSTEM (AGS) -CLOSE-IN GUN SYSTEM (CIGS) (1) Sep 2011 199 months 192 months Apr 2028 Sep 2028 Aug 2029 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals Jan 2006 Apr 2006 Design Agent Northrop Grumman Ship Systems Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C BUDGET ESTIMATE Justification: FY27 funding supports DDG 1002 Mission Systems Activation extension. - Completes SPY activation; restores systems, and implements Fire detection and actuation system (FDAS) ship wide. Footnotes: LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 2 of 25 P-1 Line #12 Volume 1 - 188 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2119 / DDG 1000 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (1) Future USS Lyndon B. Johnson is currently at Huntington Ingalls Industries - Ingalls Shipbuilding in Pascagoula, MS for Mission System Activation (MSA). The Conventional Prompt Strike Weapon System will be installed during the MSA. MSA periods complete with acceptance trials and ship delivery. LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 3 of 25 P-1 Line #12 Volume 1 - 189 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) P-1 Line Item Number / Title: 2119 / DDG 1000 FY 2009 Cost Categories Qty indicates the presence of a P-8a Total Cost (Each) Plan Costs ($ M) 1 Basic Construction/Conversion Change Orders Electronics Ordnance 80.328 (†) Hull, Mechanical, and Electrical (HM&E) 563.435 1,649.283 1,641.472 (†) 76.848 (†) 305.311 Other Cost 131.441 Total Ship Estimate 4,448.118 Less Advance Procurement FY 2008 149.827 Less Subsequent Full Funding FY 2010 1,065.507 Less Subsequent Full Funding FY 2011 140.062 Less Subsequent Full Funding FY 2012 70.789 Less Subsequent Full Funding FY 2013 138.020 Less Subsequent Full Funding FY 2014 31.349 Less Subsequent Full Funding FY 2015 85.933 Less Subsequent Full Funding FY 2016 155.643 Less Subsequent Full Funding FY 2017 73.576 Less Subsequent Full Funding FY 2018 66.962 Less Subsequent Full Funding FY 2019 189.447 Less Subsequent Full Funding FY 2020 62.230 Less Subsequent Full Funding FY 2021 51.530 Less Subsequent Full Funding FY 2022 41.647 Less Subsequent Full Funding FY 2023 48.524 Less Subsequent Full Funding FY 2024 392.892 Less Subsequent Full Funding FY 2025 61.100 Less Subsequent Full Funding FY 2026 52.358 Less Subsequent Full Funding FY 2027 66.516 Net P-1 Funding 1,504.206 Remarks: Changes from the FY 2026 budget include: The FY 2027 increase of $66.5M from FY 2026 is for DDG 1002 mission systems activation extension to complete SPY activation, restoration of systems and FDAS modification. LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 4 of 25 P-1 Line #12 Volume 1 - 190 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship DDG 1002 (1) Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date BIW 2009 Sep 2011 Apr 2012 Apr 2028 Footnotes: (1) Future USS Lyndon B. Johnson is currently at Huntington Ingalls Industries - Ingalls Shipbuilding in Pascagoula, MS for Mission System Activation (MSA). The Conventional Prompt Strike Weapon System will be installed during the MSA. MSA periods complete with acceptance trials and ship delivery. LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 5 of 25 P-1 Line #12 Volume 1 - 191 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2119 / DDG 1000 FY 2009 Qty Electronics Total Cost (Each) ($ M) P-35 Items EXTERIOR COMMUNICATIONS (EXCOMMS) 1 79.962 INTEGRATED UNDERSEA WARFARE (IUSW) SYSTEM 1 105.136 MULTI FUNCTION RADAR (MFR) 1 297.999 COMMON ARRAY POWER SYSTEM (CAPS) 1 16.409 TOTAL SHIP COMPUTING ENVIRONMENT (TSCE) 1 259.191 ELECTRO-OPTICAL / INFRARED (EO/IR) 1 31.452 IDENTIFICATION FRIEND OR FOE (IFF) 1 28.138 COMMON ARRAY COOLING SYSTEM (CACS) 1 0.965 SHIP CONTROL SYSTEM (SCS) 1 117.229 COOPERATIVE ENGAGEMENT CAPABILITY (CEC) 1 7.800 SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) 1 17.682 VERTICAL LAUNCHING SYSTEM (VLS) MK 57 4-CELL MODULES 20 302.815 DDG 1002 TSCE MODERNIZATION 1 56.730 DDG 1002 UNIVERSAL CANISTER ELECTRICAL UNITS (UCEU) 80 P-35 Items Subtotal 25.600 1,347.108 Other Cost Elements MISSION SYSTEM ENGR INTEGR & TEST (MSEIT) 132.510 MISSION SYSTEM ACTIVATION 156.354 SPARES 5.500 Other Cost Elements Subtotal 294.364 Total Electronics LI 2119 - DDG 1000 Navy 1,641.472 UNCLASSIFIED Page 6 of 25 P-1 Line #12 Volume 1 - 192 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2119 / DDG 1000 FY 2009 Qty Hull, Mechanical, and Electrical (HM&E) Total Cost (Each) ($ M) P-35 Items MAIN TURBINE GENERATOR (MTG) 2 P-35 Items Subtotal 39.412 39.412 Major Items BATTLE SPARES (MTG) RIGID HULL INFLATABLE BOAT (RHIB) 2 Major Items Subtotal 1.100 1.100 Other Cost Elements HM&E (NGVLA, Moriah Wind Measurement System (WMS), Aviation Integration) 12.446 MISSION SYSTEM ACTIVATION 16.390 INTERIM SPARES 7.500 Other Cost Elements Subtotal 36.336 Total Hull, Mechanical, and Electrical (HM&E) 76.848 LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 7 of 25 P-1 Line #12 Volume 1 - 193 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2119 / DDG 1000 FY 2009 Qty Ordnance Total Cost (Each) ($ M) P-35 Items ADVANCED GUN SYSTEM (AGS) 2 CLOSE-IN GUN SYSTEM (CIGS) 2 P-35 Items Subtotal 248.596 13.795 262.391 Major Items BATTLE SPARES (AGS) DDG 1002 Missile Tubes (CPS) 4 26.000 DDG 1002 Rubber Boots, Hatches, Shock Isolation (CPS) 4 14.420 Major Items Subtotal 40.420 Other Cost Elements MISSION SYSTEM ACTIVATION 2.500 Other Cost Elements Subtotal 2.500 Total Ordnance LI 2119 - DDG 1000 Navy 305.311 UNCLASSIFIED Page 8 of 25 P-1 Line #12 Volume 1 - 194 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: EXTERIOR COMMUNICATIONS (EXCOMMS) PARM Code: PEOC4I FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 20.600 Technical Support Services 6.585 Other / NRE 52.777 Total 1 79.962 Description: EXCOMMs are part of the DDG 1000 C3I Segment and consists of a set of seven (7) external communications elements. The EXCOMM Elements support the DDG 1000 system in achieving its mission by providing communications between DDG 1000 and other land, air, and sea based platforms as well as pier-side communications. These EXCOMM elements provide the voice, data, and video communications between DDG 1000 and the external world at sea as well as when in port. The 7 elements are: Satellite Communications (SATCOMs), Line of Sight (LOS), Common Data Link-Navy (CDL-N), Information Security (INFOSEC), Common Array Element (CAE), Cooperative Engagement Capability (CEC) and Integrated Communications Controller Software (ICCS). Government legacy systems include: Distributed Common Ground System, Navy (DCGS-N), Cooperative Engagement Capability (CEC), Communication Terminals, AN/WSC-6(V)9 Shipboard Terminal, Common Link Integrated Processor (CLIP), Automated Digital Network System (ADNS), Global Broadcast Service (GBS), Communications Data Link System (CDLS), & Naval Modular Automated Communications System (NAVMACS). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF May 2012 New/Option Quantity Unit Cost 1 20.600 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 43 26 Jul 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 9 of 25 P-1 Line #12 Volume 1 - 195 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: INTEGRATED UNDERSEA WARFARE (IUSW) SYSTEM PARM Code: IWS 5.0 XR FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 54.300 Technical Support Services 5.639 Other / NRE 45.197 Total 1 105.136 Description: The IUSW suite supports DDG 1000 in achieving Undersea and Surface Dominance with the capability to detect and track hostile surface vessels, submarines, and moored volume mines. It supports the Sensor Systems Segment in accomplishing its Integrated Air and Surface Dominance (IASD) and Integrated Undersea Dominance (IUSD) objectives by providing the capability to conduct Anti-Submarine Warfare (ASW), Torpedo Defense (TD) and Mine Warfare (MIW) missions. Military Operations Other than War (MOOTW) objectives, such as Search and Rescue (SAR) (locating downed aircraft and vessels in the ocean) are also supported. There are four major subcomponents: Bow Array Component, Towed Array Component, Towed Torpedo Countermeasures Component, as well as software. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Oct 2012 New/Option Quantity Unit Cost 1 54.300 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 46 18 Dec 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 10 of 25 P-1 Line #12 Volume 1 - 196 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MULTI FUNCTION RADAR (MFR) PARM Code: IWS 2.0 SQ FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 189.573 Technical Support Services 11.145 Other / NRE 97.281 Total 1 297.999 Description: The Multi Function Radar (MFR) element supports the DDG 1000 system in achieving Integrated Air and Surface Dominance with the capability to neutralize hostile surface vessels and aircraft at short ranges. The MFR is comprised of X-Band (AN/SPY-3) arrays integrated through a common signal data processor offering surface and horizon search capabilities and 3-D air search radar capabilities. The X-Band portion also has two navigation modes (high power and lower power) for use in piloting and marine navigation. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Oct 2012 New/Option Quantity Unit Cost 1 189.573 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 36 28 Dec 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 11 of 25 P-1 Line #12 Volume 1 - 197 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: COMMON ARRAY POWER SYSTEM (CAPS) PARM Code: IWS 2.0 SQ FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 12.624 Battle Spares Technical Support Services 0.420 Other / NRE 3.365 Total 1 16.409 Description: The Common Array Power System (CAPS) provides electrical power for the Multi Function Radar (MFR), Identification of Friend or Foe (IFF), EW/Cryptology and External Communications (EXCOMMs) Elements. The CAPS is a distributed power system designed to operate from the ship-supplied medium voltage distribution Integrated Power System's (IPS) 13.8 kV AC power source. The CAPS consists of two Power Distribution Units (PDUs) and four Power Conversion Units (PCUs). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Nov 2012 New/Option Quantity Unit Cost 1 12.624 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 35 28 Jan 2023 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 12 of 25 P-1 Line #12 Volume 1 - 198 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: TOTAL SHIP COMPUTING ENVIRONMENT (TSCE) PARM Code: IWS 9.0 XV FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 147.453 Technical Support Services 10.499 Other / NRE 101.239 Total 1 259.191 Description: The Total Ship Computing Environment (TSCE) Segment provides all computing resources and associated software to the DDG 1000 System. It is a single computing environment for Ship, Combat and Support Systems. The TSCE provides a common middleware platform upon which all application/functional software can build and execute. The segment applications software, combined with TSCE hardware and software infrastructure represent the majority of the computing resources and associated software for the DDG 1000 System. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Oct 2012 New/Option Quantity Unit Cost 1 147.453 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 43 21 Dec 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 13 of 25 P-1 Line #12 Volume 1 - 199 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ELECTRO-OPTICAL / INFRARED (EO/IR) PARM Code: IWS 2.0 SJ FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 12.973 Technical Support Services 1.551 Other / NRE 16.928 Total 1 31.452 Description: The Electro-Optical / Infrared (EO/IR) Sensor Suite Element is composed of both the hardware and software components required to detect and range on specified targets and report track data to C2. The EO/IR sensor suite consists of five (5) gimbaled EO sensors located on the cardinal faces of the deckhouse and associated electronics in Electronic Modular Enclosures (EMEs). Also included are Detect and Tracking Software components that provide embedded control and generate tracks for the C2 system and Mine Like Object (MLO) detection algorithm. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Nov 2012 New/Option Quantity Unit Cost 1 12.973 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 41 22 Jan 2023 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 14 of 25 P-1 Line #12 Volume 1 - 200 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: IDENTIFICATION FRIEND OR FOE (IFF) PARM Code: NAVAIR FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 8.640 Technical Support Services 2.163 Other / NRE 17.335 Total 1 28.138 Description: Identification Friend or Foe (IFF) sensor element supports the DDG 1000 Ship System segment in accomplishing Anti-Air Warfare (AAW) and Anti-Surface Warfare (ASUW) missions. The IFF Sensor Element is a cooperative "challenge and reply" system that assists in the rapid identification, tracking and control of friendly platforms. IFF is comprised of three hardware components to include the Interrogator component, the Transponder component and the Electronically Scanned Antenna (ESA) component, as well as software. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Dec 2012 New/Option Quantity Unit Cost 1 8.640 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 33 29 Feb 2023 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 15 of 25 P-1 Line #12 Volume 1 - 201 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: COMMON ARRAY COOLING SYSTEM (CACS) PARM Code: IWS 2.0 SQ FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 Battle Spares Technical Support Services 0.107 Other / NRE 0.858 Total 1 0.965 Description: The Common Array Cooling System (CACS) provides liquid cooling for the Multi Function Radar (MFR) and External Communications (EXCOMMs) arrays. CACS is a distributed cooling system consisting of three Cooling Equipment Units (CEUs). Each CEU operates an independent coolant loop used to transport, monitor and control coolant flow to the DBR and EXCOMMs Equipment. CEUs consist of redundant pumps, a heat exchanger and filtration system. It is designed to provide liquid coolant to the MFR and EXCOMM equipment and dissipate heat to the ship-supplied chilled water. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Nov 2012 New/Option Quantity Unit Cost 1 0.000 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 35 28 Jan 2023 Competition/Second Source Initiatives: N/A Remarks: CACS Technical Services are incorporated into DBR Technical Services. DDG 1002 CACS costs are included in the DDG 1002 MFR value. LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 16 of 25 P-1 Line #12 Volume 1 - 202 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SHIP CONTROL SYSTEM (SCS) PARM Code: SPAWAR FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 42.801 Technical Support Services 8.256 Other / NRE 66.172 Total 1 117.229 Description: The Flight 1 Ship Control System (SCS) element is a system of hardware and software items that provide hierarchical and integrated ship control by the DDG 1000 crew. The SCS software architecture allows for various levels of automation for monitoring, control, reporting and configuration of SCS equipment and operations to support mission and low manning concepts. From workstation positions on the ship bridge or in the ship mission centers, the SCS coordinates, controls and monitors the navigation, hull, electric plant, machinery plant and damage control functions on the DDG 1000. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF May 2012 New/Option Quantity Unit Cost 1 42.801 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 38 31 Jul 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 17 of 25 P-1 Line #12 Volume 1 - 203 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: COOPERATIVE ENGAGEMENT CAPABILITY (CEC) PARM Code: IWS 6.0 XN FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 6.800 Technical Support Services 1.000 Total 1 7.800 Description: Cooperative Engagement Capability (CEC) is a sensor network with Integrated Fire Control capability that significantly improves Battle Force air and missile defense capabilities by coordinating measurement data from Battle Force air search sensors on CEC-equipped units into a single, real-time, composite cooperating unit (CU), to all other CUs in the Battle Force through a real-time, line of sight, high data rate sensor and engagement data distribution network. CEC is highly resistant to jamming and provides accurate grid locking (relative spatial positioning) between CUs. Each CU independently employs high capacity, parallel processing and advanced algorithms to combine all distributed sensor data into a high quality track picture that is the same for all CUs. CEC data is presented as a superset of the best air and missile defense sensor capabilities from each CU, all of which are integrated into a single input to each CU's combat weapon system. CEC significantly improves Battle Force defense in depth, including both local and area defense capabilities against current and future air missile threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/FPIF Oct 2013 New/Option Quantity Unit Cost 1 6.800 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 34 18 Dec 2023 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 18 of 25 P-1 Line #12 Volume 1 - 204 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) PARM Code: IWS 2.0 SJ FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 15.906 Technical Support Services 0.935 Other / NRE 0.841 Total 1 17.682 Description: SEWIP provides enhanced Electronic Warfare (EW) capabilities to improve anti-ship missile defense, counter-targeting and counter surveillance capabilities, as well as improved situational awareness to pace the threat, improving detection, accuracy, and mitigation of EMI. The SEWIP Block 2 is an upgraded antenna, receiver and combat system interface for AN/SLQ-32. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Lockheed Martin C/FPIF Jan 2015 New/Option Quantity Unit Cost 1 15.906 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 2 16 Oct 2026 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 19 of 25 P-1 Line #12 Volume 1 - 205 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: VERTICAL LAUNCHING SYSTEM (VLS) MK 57 4-CELL MODULES PARM Code: IWS 3L S8 FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 20 234.670 Technical Support Services 4.231 Other / NRE 63.914 Total 20 302.815 Description: The MK 57 VLS is a general purpose, operationally unmanned launching system capable of stowing, preparing, and launching missiles in support of DDG-1000 mission areas including: land attack warfare, integrated air and surface dominance, and integrated undersea dominance. The MK57 VLS provides the capability for rapid launch of missiles into a 360-degree hemispherical volume above and about the ship. The canistered missiles are stowed within the launching systems below-deck cells. DDG-1000 will have 80 total cells grouped into 20 four-cell modules. Flight 1 missiles to be carried include: Enhanced Sea Sparrow Missile (ESSM), Standard Missile-2 (SM-2) Blk III, and Tomahawk Land Attack Missile (TLAM) Blk III/IV. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 Raytheon C/CPIF Oct 2012 New/Option Quantity Unit Cost 20 11.734 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 40 24 Dec 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 20 of 25 P-1 Line #12 Volume 1 - 206 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: DDG 1002 TSCE MODERNIZATION PARM Code: IWS 9 FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 56.730 Total 1 56.730 Description: Total Shipboard Computing Environment (TSCE) Modernization DDG 1002 procurement is for software integration and procurement of modernized network infrastructure and data center, peripherals (lab, shipboard tactical assets and ZUMWALT Training facility). Final delivery has moved to December 2026 to support installation of CPS, in line with her current combat systems activation. Additionally, TSCE Modernization procurement previously budgeted in LI 0947 DDG 1000 Class Support Equipment and has been moved to SCN LI 2119 to be completed onboard DDG 1002 prior to final delivery. Procurement(s) occur in FY24 for an FY25-FY26 work start and completion. Regarding TSCE, the combat system computing infrastructure (data centers, network infrastructure & communications devices) is more than a decade old and requires extensive modernization and technology refresh to sustain operations, mitigate obsolescence, provide a hardware baseline and software development processes that align to PEO IWS Integrated Combat System efforts. The Zumwalt-class Operational Availability (Ao), as specified in the Operational Requirements Document (ORD), is the driving requirement for TSCE modernization. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2009 DDG 1002 Raytheon C/FFP Nov 2023 Option Quantity Unit Cost 1 56.730 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 12 23 May 2025 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 21 of 25 P-1 Line #12 Volume 1 - 207 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: DDG 1002 UNIVERSAL CANISTER ELECTRICAL UNITS (UCEU) PARM Code: IWS 3 FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 80 25.600 Total 80 25.600 Description: MK 57 Vertical Launching System (VLS) Universal Canister Electronics Unit (UCEU) was developed to provide any missile/any cell launch capabilities on DDG 1000 ZUMWALT class ships. The UCEU provides electronic and data communication interface between the Missile Control Unit (MCU) and the encanistered missile. The UCEU replaces obsolete missile-specific Canister Electronics Unit (CEU) hardware. The UCEU supports Warfighter load planning by eliminating the need to match specific CEUs to the missile loaded into individual missile cells. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2009 DDG 1002 TBD C/FFP Apr 2026 New Quantity Unit Cost 80 0.320 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 0 12 Apr 2027 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 22 of 25 P-1 Line #12 Volume 1 - 208 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MAIN TURBINE GENERATOR (MTG) PARM Code: PMS 500 WA FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 39.412 2 39.412 Technical Support Services Other / NRE Total Description: The Main Turbine Generator Set (MTG) shall be capable of being utilized as the prime power source on the DDG 1000 Destroyer for electrical power applications (propulsion, ship services, and combat systems loads). The DDG 1000 baseline includes two MTGs. The minimum output power from each MTG shall be 35.25 MWe. The engine utilizes a Full Authority Digital Control Local Operating Panel (FADC LOCOP) and electric start system. The generator contains redundant automatic voltage regulators (AVR) with automatic changeover. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2009 DDG 1002 Rolls-Royce C/FFP Jan 2008 Option Quantity Unit Cost 2 19.706 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 33 24 Jul 2023 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 23 of 25 P-1 Line #12 Volume 1 - 209 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: ADVANCED GUN SYSTEM (AGS) PARM Code: IWS 3C YF FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 206.747 Technical Support Services 3.860 Other / NRE 37.989 Total 2 248.596 Description: The Advanced Gun System is a fully automated, single barrel, 155mm, vertically loaded, stabilized gun mount that is capable of storing, initializing/programming, loading and firing projectiles and propelling charges. Its primary mission is Land Attack Warfare in support of ground and expeditionary forces beyond the Line of Sight in the DDG 1000 system's littoral engagement area where precise, rapid-response, high-volume, long-range fire support is required. Each DDG 1000 will carry two complete AGS systems - Mount 61 and 62. The above deck configurations are identical but each has a slightly different below deck configuration. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 BAE C/CPIF Apr 2012 New/Option Quantity Unit Cost 2 103.374 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 31 39 Jun 2022 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 24 of 25 P-1 Line #12 Volume 1 - 210 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2119 / DDG 1000 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CLOSE-IN GUN SYSTEM (CIGS) PARM Code: IWS 3C YF FY 2009 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 7.534 Technical Support Services 3.381 Other / NRE 2.880 Total 2 13.795 Description: The Close-In Gun System (CIGS) supports the DDG 1000 system in achieving Integrated Air and Surface Dominance with the capability to neutralize hostile surface vessels and aircraft at short ranges. CIGS also supports the Military Operations Other than War (MOOTW) missions, such as performing maritime interdiction, conducting maritime law enforcement, and supporting hostage rescue. Two (2) CIGS will be mounted on the aft end of the hanger. The CIGS MK 46 MOD 2 GWS is composed of a turret assembly that houses the MK 44 MOD 2 cannon and an advanced Fire Control System that includes a ballistic solution computer, an electro-optical sensor package, and an eye-safe laser range finder. The system uses a forward-looking infrared sensor, a low-light television camera, and eye safe laser range finder with a closed-loop tracking system to optimize accuracy against small, high-speed surface targets. The system can be operated locally from the gun control station inside the turret, remotely from the MK 46 MOD 2 GWS Remote Gun Station Operator (RGSO) panel in the Combat Information Center (CIC), or manually using hand cranks from inside the turret. The 30mm cannon, MK 44 MOD 2, is a single barrel, open bolt, dual feed, electrically powered, chain-driven automatic cannon. The system has a magazine capacity of 424 rounds, a dual-feed capability with a firing rate of 200 rounds per minute, and is capable of selectively switching between ammunition types and firing modes. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2009 DDG 1002 General Dynamics Land Systems C/FFP Mar 2016 New/Option Quantity Unit Cost 2 3.767 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2009 DDG 1002 Apr 2028 6 18 Apr 2026 Competition/Second Source Initiatives: N/A LI 2119 - DDG 1000 Navy UNCLASSIFIED Page 25 of 25 P-1 Line #12 Volume 1 - 211 === page 262 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 212 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2122 / DDG-51 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2029 To FY 2031 Complete FY 2030 Total Gross/Weapon System Cost ($ in Millions) 117,822.879 7,858.814 306.125 4,256.914 Less PY Advance Procurement ($ in Millions) 2,910.850 2.659 65.021 1,023.521 Less Cost To Complete ($ in Millions) 3,237.603 - - - - - - - - - - 3,237.603 2,116.371 - - - - - - - - - - 2,116.371 - - - - - - - - 227.100 - - - - - 4,247.883 Less Hurricane ($ in Millions) 227.100 Less EOQ ($ in Millions) 2,150.761 1,587.636 230.331 279.155 - FY 2028 3 Millions) 1 FY 2027 Total 94 Less Subsequent Year Full Funding ($ in - FY 2027 OOC 1 1 1 2 2 3 107 0.000 4,256.914 4,026.201 4,209.440 6,613.151 6,964.218 15,080.837 167,138.579 - 1,023.521 502.271 502.271 502.305 1,001.157 6,510.055 - 279.155 - Less Escalation ($ in Millions) 48.200 - - - - - - - - - - 48.200 Less Transfer ($ in Millions) 218.500 - - - - - - - - - - 218.500 Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) 106,913.494 6,268.519 10.773 433.000 1,683.371 - 2,954.238 - 0.000 2,954.238 - 7,951.890 10.773 83.224 1,750.000 Plus Cost To Complete ($ in Millions) 1,649.333 233.514 181.495 Plus EOQ ($ in Millions) 3,826.300 - - - - - - - - Plus Escalation ($ in Millions) 48.200 - - - - - - - Plus Transfer ($ in Millions) 218.500 - - - - - - - 227.100 116,656.338 8,268.628 1,942.268 - 178.224 - - - 178.224 - 3,132.462 0.000 3,132.462 4,026.201 1,758.004 340.120 6,124.325 3,707.169 - 3,340.411 Total Obligation Authority ($ in Millions) 2,954.238 - 6,110.880 107,346.494 - - - 3,707.169 Plus CY Advance Procurement ($ in Millions) Plus Hurricane ($ in Millions) 2,954.238 - 4,026.201 286.375 3,993.544 6,110.880 - 6,461.913 6,461.913 14,079.680 150,532.867 2,116.371 152,649.238 - 6,931.639 - 3,237.602 - - 3,826.300 - - - 48.200 - - - 218.500 264.749 6,375.629 - 14,079.680 103.792 6,565.705 14,079.680 227.100 167,138.579 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 3,033.905 123.099 167.272 138.165 - 138.165 198.911 191.240 178.534 212.087 1,313.347 5,556.560 119,690.243 8,391.727 2,109.540 3,270.627 - 3,270.627 6,323.236 4,184.784 6,554.163 6,777.792 15,393.027 172,695.139 1,253.435 2,619.605 4,256.914 - 4,256.914 4,026.201 4,209.440 3,306.576 3,482.109 5,026.946 1,562.043 - Description: DDG 51 will be able to operate offensively and defensively, independently or as units of Carrier Strike Groups and Surface Action Groups, in support of Marine Amphibious Task Forces in multi-threat environments that include air, surface and subsurface threats. These ships will respond to Low Intensity Conflict/Coastal and Littoral Offshore Warfare (LIC/CALOW) scenarios as well as open ocean conflict providing or augmenting power projection and forward presence requirements, and escort operations at sea. Beginning in FY17, DDG 51 Flight III with the Air and Missile Defense Radar (SPY-6(V)1) will significantly enhance Integrated Air and Missile Defense capability against current and future threats. Starting in FY22, DDG 51 Flight III AN/SLQ-32 system is upgraded from AN/SLQ-32(V)6 to AN/SLQ-32(V)7, with the addition of SEWIP Block 3, which provides advanced Electronic Attack (EA) capability to keep pace with the evolving Anti-Ship Missile (ASM) threat and counter-targeting. Starting in FY23, the MK38 LI 2122 - DDG-51 Navy UNCLASSIFIED Page 1 of 29 P-1 Line #13 Volume 1 - 213 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2122 / DDG-51 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Gun Weapon System is being upgraded to the Mod 4 configuration and transitions from a post construction to an in-line installation, the WSN-7 inertial navigation system is being replaced with the follow-on WSN-12 navigation system, 15 additional berths are being introduced, and the Bridgemaster Surface Search Radar is being replaced by the Next-Generation Surface Search Radar (NGSSR). The FY 2027 request for DDG 51 includes $2,954,238 thousand and quantity of 1 of discretionary and $314,000 thousand and quantity of 0 of mandatory for a total of $3,268,238 thousand and a quantity of 1. $314,000 thousand of the mandatory funds will be used to enhance the U.S surface maritime industrial base productivity in various areas including supplier development, shipyard infrastructure, strategic sourcing, workforce development, technology opportunities, and wages. The $314,000 thousand of the FY 2027 funds are different from the FY 2026 mandatory funds that were not provided for industrial base support. The FY 2026 spend plan amount for DDG 51 includes $1,942,268 thousand and quantity of 0 of discretionary and $5,400,000 thousand and quantity of 2 of mandatory funding for a total of $7,342,268 thousand and a quantity of 2. Note: (1) The FY 2018-2022 acquisition strategy is a 10 ship Multi-year Procurement (MYP) with options. This budget request reflects savings for the ships in FY 2018-FY 2022 associated with EOQ procurement and a MYP strategy. Additional ships in FY 2019 and FY 2020 also reflect quantity savings over annual ship prices. (2) The Navy awarded two shipbuilding Multi-year Procurement (MYP) contracts for FY 2023 - FY 2027 for 9 ships with options. This budget request reflects savings for the ships in FY 2023-FY 2027 associated with EOQ procurement and a MYP strategy. The additional ships in FY 2023 and FY 2025 also reflect quantity savings over annual ship prices. (3) FY 2025 includes subsequent year full funding for the following: $923,808 thousand for FY 2023 ships and $759,563 thousand for FY 2024 ships. (4) FY 2025 includes $41,500 thousand of Advance Procurement for a third FY 2026 ship. (5) FY 2026 Advance Procurement includes $1,000,000 thousand for an FY 2027 ship, $450,000 thousand for shipyard infrastructure, and $300,000 thousand for wage enhancements. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 2 of 29 P-1 Line #13 Volume 1 - 214 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2122 / DDG-51 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft FLIGHT IIA FLIGHT III 509 ft 59 ft 9217 TONS - 509 ft 59 ft 9650 TONS Production Status: DDG 127 DDG 126 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Sep 2017 Jun 2013 108 months 89 months Sep 2026 Jan 2027 Dec 2027 Production Status: (1) DDG 130 DDG 131 DDG 132 DDG 133 Sep 2018 Sep 2018 Sep 2018 Dec 2018 Sep 2018 171 months 90 months Sep 2027 Jan 2028 Dec 2028 107 months 79 months Aug 2027 Dec 2027 Nov 2028 122 months 90 months Nov 2028 Mar 2029 Feb 2030 122 months 84 months Nov 2028 Mar 2029 Feb 2030 129 months 91 months Sep 2029 Jan 2030 Dec 2030 137 months 86 months Feb 2030 Jun 2030 May 2031 DDG 134 DDG 135 DDG 136 DDG 137 DDG 138 DDG 139 DDG 140 145 months 83 months Oct 2030 Feb 2031 Jan 2032 128 months 87 months Feb 2031 Jun 2031 May 2032 153 months 86 months Jun 2031 Oct 2031 Oct 2032 161 months 71 months Feb 2032 Jun 2032 May 2033 169 months 91 months Oct 2032 Feb 2033 Jan 2034 179 months 71 months Aug 2033 Nov 2033 Oct 2034 124 months 89 months Dec 2033 Apr 2034 Mar 2035 Production Status: DDG 141 DDG 142 DDG 143 DDG 144 DDG 145 DDG 146 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Aug 2023 Aug 2023 Aug 2023 Aug 2023 Aug 2023 Aug 2023 DDG 148 132 months 71 months Aug 2034 Dec 2034 Nov 2035 144 months 71 months Aug 2035 Dec 2035 Nov 2036 156 months 71 months Aug 2036 Dec 2036 Nov 2037 137 months 89 months Jan 2035 May 2035 Apr 2036 168 months 71 months Aug 2037 Dec 2037 Nov 2038 180 months 71 months Aug 2038 Dec 2038 Nov 2039 Production Status: DDG 147 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date LI 2122 - DDG-51 Navy Sep 2018 DDG 129 Jun 2020 (3) Aug 2023 192 months 71 months Aug 2039 Dec 2039 Nov 2040 DDG 149 Sep 2018 (4) Sep 2018 Sep 2018 Sep 2018 Aug 2023 (2) Jul 2025 124 months 87 months Nov 2035 Mar 2036 Feb 2037 DDG 150 Aug 2023 Aug 2023 157 months 85 months Sep 2036 Dec 2036 Nov 2037 204 months 71 months Aug 2040 Dec 2040 Nov 2041 UNCLASSIFIED Page 3 of 29 P-1 Line #13 Volume 1 - 215 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2122 / DDG-51 Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Issue Date for TLR Jun 1983 N/A Issue Date for TLS N/A N/A Preliminary Design Mar 1982 Dec 1982 Contract Design May 1983 Jun 1984 Detail Design N/A N/A Request for Proposals N/A N/A Design Agent BIW Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C BUDGET ESTIMATE Footnotes: (1) (2) (3) (4) DDG 127, 129 and follow on ships: Revised ship delivery estimates reflect higher confidence levels in ship delivery dates. DDG 148 is the FY25-3 Option Ship Reconciliation Ship Reconciliation Ship LI 2122 - DDG-51 Navy UNCLASSIFIED Page 4 of 29 P-1 Line #13 Volume 1 - 216 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Cost Categories (†) indicates the presence of a P-8a Plan Costs Change Orders (†) FY 2017 Total Cost (Each) ($ M) 3 Basic Construction/Conversion Electronics FY 2016 Qty 204.436 2,472.801 Qty FY 2018 Total Cost (Each) ($ M) 2 81.454 2,007.307 Qty FY 2019 Total Cost (Each) ($ M) 2 72.811 1,980.253 Qty FY 2020 Total Cost (Each) ($ M) 3 74.195 3,166.044 Qty FY 2021 Total Cost (Each) ($ M) 3 75.713 2,973.078 Qty FY 2022 Total Cost (Each) ($ M) 2 77.117 2,247.903 Qty FY 2023 Total Cost (Each) ($ M) 2 86.682 Qty Total Cost (Each) ($ M) 3 92.152 1,959.990 4,558.163 127.571 89.053 48.959 85.449 85.974 56.334 77.417 136.767 502.100 346.044 379.000 587.418 619.780 424.952 546.096 949.051 219.752 147.668 166.433 231.606 229.166 163.945 164.030 295.732 1,443.896 1,111.357 921.269 1,546.010 1,594.555 1,157.796 1,161.682 1,835.479 73.033 73.971 75.846 77.216 81.468 77.593 76.985 82.196 5,043.589 3,856.854 3,644.571 5,767.938 5,659.734 4,205.640 4,072.882 7,949.540 Hull, Mechanical, and Electrical (HM&E) (†) Ordnance (†) Other Cost Total Ship Estimate Less Advance Procurement FY 2015 Less Advance Procurement FY 2024 Less Advance Procurement FY 2025 Less Advance Procurement FY 2026 Less Subsequent Full Funding FY 2017 Less Subsequent Full Funding FY 2025 134.039 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 433.000 - - - - - - - Less Cost to Complete FY 2022 1.176 - - - - - - - Less Cost to Complete FY 2023 24.238 168.178 5.930 - - - - - Less Cost to Complete FY 2024 104.090 121.827 - - - - - - Less Cost to Complete FY 2025 10.509 115.600 107.405 - - - - - Less Cost to Complete FY 2026 14.892 62.365 104.238 - - - - - Less Cost to Complete FY 2027 - 24.503 69.919 83.802 - - - - Less Cost to Complete FY 2028 - - - 289.641 50.479 - - - Less Cost to Complete FY 2029 - - - 90.398 141.031 54.946 - - LI 2122 - DDG-51 Navy UNCLASSIFIED Page 5 of 29 P-1 Line #13 923.808 Volume 1 - 217 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Cost Categories (†) indicates the presence of a P-8a Less Cost to Complete FY 2030 Less Cost to Complete FY 2031 FY 2016 Qty (Each) FY 2017 Total Cost ($ M) - Qty (Each) FY 2018 Total Cost ($ M) Qty (Each) FY 2019 Total Cost ($ M) Qty (Each) FY 2020 Total Cost ($ M) Qty (Each) FY 2021 Total Cost ($ M) - - 14.898 39.269 Qty (Each) FY 2022 Total Cost ($ M) 134.216 Qty (Each) FY 2023 Total Cost ($ M) Qty (Each) Total Cost ($ M) 76.366 - - - - - - 65.597 38.195 Less EOQ FY 2013 108.345 13.677 - - - - - - Less EOQ FY 2014 130.650 168.912 - - - - - - Less EOQ FY 2018 - - - 39.362 25.940 12.517 12.517 - Less EOQ FY 2019 - - - - 337.720 152.104 101.104 - Less EOQ FY 2020 - - - - - 632.014 112.014 - Less EOQ FY 2021 - - - - - - 29.297 - Less EOQ FY 2022 - - - - - - - 41.000 Less EOQ FY 2023 - - - - - - - - Less EOQ FY 2024 - - - - - - - Net P-1 Funding LI 2122 - DDG-51 Navy 4,082.650 3,181.792 3,357.079 5,249.837 UNCLASSIFIED Page 6 of 29 5,065.295 3,219.843 P-1 Line #13 3,675.987 6,946.537 Volume 1 - 218 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) FY 2024 Cost Categories indicates the presence of a P-8a Plan Costs Change Orders (†) Hull, Mechanical, and Electrical (HM&E) Ordnance (†) Other Cost Total Ship Estimate (†) FY 2025 Total Cost (Each) Qty ($ M) 2 Basic Construction/Conversion Electronics Qty (Each) 82.697 FY 2026 Total Cost Qty ($ M) 3 (Each) 83.596 FY 2027 Total Cost Qty ($ M) 0 Total Cost (Each) - 87.927 3,322.458 4,628.213 91.552 136.872 - 94.222 619.811 950.971 23.521 414.741 100.673 154.029 - 66.009 1,187.455 1,816.641 - 784.486 87.684 88.492 5,492.330 7,858.814 282.604 ($ M) 1 306.125 2,719.555 89.974 4,256.914 Less Advance Procurement FY 2015 - - - - Less Advance Procurement FY 2024 - 2.659 2.659 2.659 Less Advance Procurement FY 2025 - - 62.362 20.862 Less Advance Procurement FY 2026 - - - 1,000.000 - - - - - - - Less Subsequent Full Funding FY 2017 Less Subsequent Full Funding FY 2025 759.563 Less Cost to Complete FY 2022 - - - - Less Cost to Complete FY 2023 - - - - Less Cost to Complete FY 2024 - - - - Less Cost to Complete FY 2025 - - - - Less Cost to Complete FY 2026 - - - - Less Cost to Complete FY 2027 - - - - Less Cost to Complete FY 2028 - - - - Less Cost to Complete FY 2029 - - - - Less Cost to Complete FY 2030 - - - - Less Cost to Complete FY 2031 - - - - Less EOQ FY 2013 - - - - Less EOQ FY 2014 - - - - Less EOQ FY 2018 - - - - Less EOQ FY 2019 - - - - Less EOQ FY 2020 - - - - Less EOQ FY 2021 - - - - Less EOQ FY 2022 79.000 - - Less EOQ FY 2023 154.588 Less EOQ FY 2024 LI 2122 - DDG-51 Navy - UNCLASSIFIED Page 7 of 29 - 154.588 154.588 154.588 1,433.048 75.743 124.567 P-1 Line #13 Volume 1 - 219 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) Cost Categories indicates the presence of a P-8a Net P-1 Funding FY 2024 Qty (Each) FY 2025 Total Cost ($ M) Qty (Each) FY 2026 Total Cost 4,499.179 ($ M) Qty (Each) FY 2027 Total Cost 6,268.519 ($ M) Qty (Each) 10.773 Total Cost ($ M) 2,954.238 Remarks: Total Ship Estimates include incorporation of Bridge System Navigation Modifications beginning with FY15 ships, realized cost adjustments for government furnished equipment systems in ORDNANCE for FY17 - FY22 ships and ELECTRONICS for FY19 - FY22 ships, incorporation of power conversion module equipment at Land Based Sites in support of FY22 SHIPS (HM&E cost category), and realized costs of construction for FY15 - FY19 ships. Total Ship Estimates for FY21 include 1) $130M of FY20 Congressionally added advance procurement for the Surface Combatant Supplier Base, and 2) $215M of Congressionally added full funding for Surface Combatant Shipyard Infrastructure. The amounts are shown in the Basic Construction/Conversion cost category. Total Ship Estimates for FY23 include $380M of Congressionally added full funding for large surface combatant infrastructure (shown in Basic Construction/Conversion cost category). Total Ship Estimates for FY24 include $300M of Congressionally added full funding for large surface combatant infrastructure (shown in Basic Construction/Conversion cost category). Total Ship Estimates for FY24 include $60M for a multi-use facility at Bath Iron Works. This structure is to support sailor quality of service initiatives. This is shown in the Basic Construction/Conversion cost category. Total Ship Estimates for FY23-FY27 are based on a Multi-year Procurement acquisition strategy with options. FY 2025 includes $41,500 thousand of Advance Procurement for a third FY 2026 ship. This is shown in Basic Construction/Conversion. The FY 2026 Total Ship Estimate does not show $5,400,000 thousand and quantity of two funded in FY 2026 mandatory funding. Total ship estimate for FY 2026 is $5,706,125 thousand. Total Ship Estimates for FY 2027 include $1,000M of Congressionally added advance procurement for an 2027 ship. This is shown in Basic Construction/Conversion. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 8 of 29 P-1 Line #13 Volume 1 - 220 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date DDG 127 Bath Iron Works 2016 Sep 2017 Apr 2019 Sep 2026 DDG 126 Bath Iron Works 2017 Jun 2013 Mar 2020 Sep 2027 Huntington Ingalls Industries 2018 Sep 2018 Jan 2021 Aug 2027 DDG 130 Bath Iron Works 2019 Sep 2018 May 2021 Nov 2028 DDG 131 Huntington Ingalls Industries 2019 Sep 2018 Nov 2021 Nov 2028 DDG 132 Bath Iron Works 2019 Dec 2018 Feb 2022 Sep 2029 DDG 133 Huntington Ingalls Industries 2020 Sep 2018 Dec 2022 Feb 2030 DDG 134 Bath Iron Works 2020 Sep 2018 Nov 2023 Oct 2030 DDG 135 Huntington Ingalls Industries 2020 Jun 2020 Nov 2023 Feb 2031 DDG 136 Bath Iron Works 2021 Sep 2018 Apr 2024 Jun 2031 DDG 137 Huntington Ingalls Industries 2021 Sep 2018 Mar 2026 Feb 2032 DDG 138 Bath Iron Works 2022 Sep 2018 Mar 2025 Oct 2032 DDG 139 Huntington Ingalls Industries 2022 Sep 2018 Sep 2027 Aug 2033 DDG 140 Bath Iron Works 2023 Aug 2023 Jul 2026 Dec 2033 DDG 141 Huntington Ingalls Industries 2023 Aug 2023 Sep 2028 Aug 2034 DDG 142 Huntington Ingalls Industries 2023 Aug 2023 Sep 2029 Aug 2035 DDG 143 Huntington Ingalls Industries 2024 Aug 2023 Sep 2030 Aug 2036 DDG 144 Bath Iron Works 2024 Aug 2023 Aug 2027 Jan 2035 DDG 145 Huntington Ingalls Industries 2025 Aug 2023 Sep 2031 Aug 2037 DDG 146 DDG 129 (1) Huntington Ingalls Industries 2025 Aug 2023 Sep 2032 Aug 2038 DDG 148 (2) Bath Iron Works 2025 Jul 2025 Aug 2028 Nov 2035 DDG 147 (3) Huntington Ingalls Industries 2026 Aug 2023 Sep 2033 Aug 2039 DDG 149 (4) Bath Iron Works 2026 Aug 2023 Aug 2029 Sep 2036 DDG 150 Huntington Ingalls Industries 2027 Aug 2023 Sep 2034 Aug 2040 DDG 151 TBD 2028 Sep 2028 Aug 2036 Aug 2041 DDG 152 TBD 2029 Sep 2028 Aug 2037 Aug 2042 DDG 153 TBD 2030 Sep 2028 Aug 2038 Aug 2043 DDG 154 TBD 2030 Sep 2028 Aug 2038 Aug 2043 DDG 155 TBD 2031 Sep 2028 Aug 2039 Aug 2044 DDG 156 TBD 2031 Sep 2028 Aug 2039 Aug 2044 Footnotes: (1) DDG 127, 129 and follow on ships: Revised ship delivery estimates reflect higher confidence levels in ship delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 9 of 29 P-1 Line #13 Volume 1 - 221 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (2) (3) (4) P-1 Line Item Number / Title: 2122 / DDG-51 DDG 148 is the FY25-3 Option Ship Reconciliation Ship Reconciliation Ship LI 2122 - DDG-51 Navy UNCLASSIFIED Page 10 of 29 P-1 Line #13 Volume 1 - 222 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2025 Electronics Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items SQQ 89 ASW 3 177.416 1 67.565 AN/SLQ-32 SEWIP V(7) 3 247.277 1 124.568 USQ 82(V) GEDMS 3 48.645 1 16.953 EXCOMM 3 194.160 1 76.082 AN/UPX 29(V) IFF and TACAN 3 24.514 1 8.542 CEC 3 20.072 1 P-35 Items Subtotal 712.084 6.995 300.705 Major Items NGSSR 3 8.068 1 4.423 NAVIGATION SYSTEM 3 13.508 1 4.708 SLQ 25 NIXIE 3 9.536 1 4.976 SRQ 4 LAMPS III 3 20.323 1 7.083 SPECTRAL 3 67.250 1 23.437 MIDS 3 11.662 1 4.064 MK 53 NULKA 3 7.641 1 2.663 TSA ANTENNA 3 6.582 1 Major Items Subtotal 144.570 2.294 53.648 Other Cost Elements MISC. ELECTRONICS 3 94.317 1 60.388 Other Cost Elements Subtotal 94.317 60.388 Total Electronics 950.971 414.741 Remarks: FY25 and future years EXCOMM reflects projected increased costs for the Navy Multiband Terminal (NMT). FY26 and future years Next-Generation Surface Search Radar (NGSSR) reflects contract procurement cost increases. FY26 Government Furnished Equipment (GFE) included in Mandatory funding request. FY27 includes increased hardware costs for SQQ-89, SLQ-32 SEWIP, and EXCOMM, with further costs due to profile reduction and loss of EOQ. MISC ELECTRONICS FY27 includes increased costs due to profile reductions and loss of EOQ, obsolescence, and qualifying new vendors amidst supply chain shortages. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 11 of 29 P-1 Line #13 Volume 1 - 223 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2025 Hull, Mechanical, and Electrical (HM&E) Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items STC 3 IVCS 3 P-35 Items Subtotal 26.240 1 26.240 9.100 9.100 Major Items Machinery Control System 3 20.756 1 11.893 Integrated Bridge Navigation System 3 26.975 1 7.627 CYBER BDC 3 14.411 1 4.997 WSN 12 3 13.036 1 Major Items Subtotal 75.178 5.682 30.199 Other Cost Elements MISC. HM&E 3 52.611 1 26.710 Other Cost Elements Subtotal 52.611 26.710 Total Hull, Mechanical, and Electrical (HM&E) 154.029 66.009 Remarks: FY26 Government Furnished Equipment (GFE) included in Mandatory funding request. MISC HM&E FY27 includes increased costs due to profile reductions and loss of EOQ, obsolescence, and qualifying new vendors amidst supply chain shortages. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 12 of 29 P-1 Line #13 Volume 1 - 224 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2025 Ordnance Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items AEGIS WEAPON SYSTEM (MK-7) 3 465.717 1 255.164 AN/SPY-6(V)1 (AMDR) 3 692.876 1 241.111 VLS MK 41 3 219.986 1 76.289 MK 45 Light Weight Gun (LWG) 3 90.752 1 31.627 MK 37 TOMAHAWK 3 51.003 1 17.775 PHALANX (CIWS) 3 29.127 1 10.151 SPQ-9B Radar 3 32.923 1 11.473 MK-38 Gun Weapon System (GWS) 3 23.031 1 P-35 Items Subtotal 1,605.415 8.026 651.616 Major Items MK 32 Surface Vessel Torpedo Tubes (SVTT) 3 10.513 1 3.663 ELECTRO-OPTICAL SYSTEM 3 11.125 1 3.877 MK 160 Gun Fire Control System (GFCS) 3 11.568 1 Major Items Subtotal 33.206 5.892 13.432 Other Cost Elements MISC. ORDNANCE 3 Other Cost Elements Subtotal Total Ordnance 178.020 1 119.438 178.020 119.438 1,816.641 784.486 Remarks: MK-7 FY25 reflect savings due to Economic Ordering Quantity (EOQ). FY26 and future reflects projected cost estimates. MK 32 FY26 and future years reflects anticipated costs to shift from refurbished equipment to new production. FY26 Government Furnished Equipment (GFE) included in Mandatory funding request. FY27 includes investments to Land Based Test Sites (LBTS) to reduce technical risks of planned Aegis system upgrades. MISC ORDNANCE FY27 includes increased costs due to profile reductions and loss of EOQ, obsolescence, and qualifying new vendors amidst supply chain shortages. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 13 of 29 P-1 Line #13 Volume 1 - 225 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SQQ 89 ASW PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 113.824 1 43.347 Spares 1.891 0.720 System Engineering 18.912 7.202 Technical Engineering Services 9.221 3.512 Other Costs 33.568 12.784 Total 3 177.416 1 67.565 Description: Detect, classify, localize and track submerged submarines under all environmental conditions at long range from ASW ships, using bottom reflected and convergence zone acoustic paths. Starting in FY20, the Multi-Function Towed Array (MFTA) sensor along with the Handling and Stowage Gear (H&SG) is included as part of in-line construction of new DDG-51 class ships. Contract Data: Quantity Unit Cost Option 3 37.941 Option 1 43.347 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 LOCKHEED MARTIN C/CPFF Jun 2025 FY 2027 DDG 150 LOCKHEED MARTIN C/CPFF Jun 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 41 24 Jun 2030 FY 2027 DDG 150 Aug 2040 41 24 Mar 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. FY27 includes increased costs due to profile reduction and loss of EOQ. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 14 of 29 P-1 Line #13 Volume 1 - 226 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SLQ-32 SEWIP V(7) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 223.028 1 112.353 Spares 7.437 3.747 System Engineering 10.168 5.122 Technical Engineering Services 0.685 0.345 Other Costs 5.959 Total 3 3.001 247.277 1 124.568 Description: The AN/SLQ-32 Surface Electronic Warfare Improvement Program (SEWIP)V(7) provides DDG 51 Class Destroyers with the electronic warfare capability of automatically detecting, sorting, classifying, tracking, engaging and continually displaying emitter and platform densities of anti-ship missiles (ASM). The AN/SLQ-32(V)7 (also called SEWIP Block 3) also provides advanced electronic attack capability to keep pace with the evolving ASM threat and counter-targeting. Contract Data: Quantity Unit Cost Option 3 74.343 Option 1 112.353 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 NORTHROP GRUMMAN C/FFP Aug 2025 FY 2027 DDG 150 NORTHROP GRUMMAN C/FFP Mar 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 DDG 145 Nov 2035 34 30 Required Award Date Jul 2030 FY 2027 DDG 150 Aug 2040 34 30 Apr 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. FY27 includes increased costs due to profile reduction and loss of EOQ. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 15 of 29 P-1 Line #13 Volume 1 - 227 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: USQ 82(V) GEDMS PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 23.155 1 8.070 Technical Data and Documentation 2.318 0.808 System Engineering 5.681 1.980 Technical Engineering Services 2.849 0.993 Other Costs 14.642 Total 3 5.102 48.645 1 16.953 Description: Gigabit Ethernet Data Multiplex System (GEDMS) is the mission critical ship-wide network that transfers data associated with Machinery, Steering, Navigation, Combat, Alarms & Indicating, and Damage Control Systems. It is a general purpose modular data transfer system that provides high speed, reliable and survivable data from source systems to user systems automatically or on demand. Contract Data: Quantity Unit Cost Option 3 7.718 Option 1 8.070 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 TBD TBD Sep 2026 FY 2027 DDG 150 TBD TBD Mar 2028 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 40 16 Mar 2031 FY 2027 DDG 150 Aug 2040 40 16 Dec 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 16 of 29 P-1 Line #13 Volume 1 - 228 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: EXCOMM PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Qty ($ M) Major Hardware 3 Total Cost (Each) 116.306 ($ M) 1 45.575 Technical Data and Documentation 0.468 0.183 Spares 1.076 0.421 System Engineering 12.105 4.743 Technical Engineering Services 7.066 2.769 Other Costs 22.477 8.808 Assembly & Integration 34.662 13.583 Total 3 194.160 1 76.082 Description: The Exterior Communication System (EXCOMM) provides voice, data, teletypewriter (TTY), continuous wave (CW), and other communication services on designated frequencies from very low frequency (VLF) to ultra-high frequency (UHF) for tactical and record requirements. It includes all external radio communication devices aboard the ship. Contract Data: Quantity Unit Cost Various 3 38.769 Various 1 45.575 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 VARIOUS Various Various FY 2027 DDG 150 VARIOUS Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 DDG 145 Nov 2035 31 24 Required Award Date Apr 2031 FY 2027 DDG 150 Aug 2040 31 24 Jan 2036 Competition/Second Source Initiatives: Numerous contract arrangements (sole source/competitive) Remarks: Note: There are numerous components and contracts resulting in various award dates. Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. FY25 and future years EXCOMM reflects projected increased costs for the Navy Multiband Terminal (NMT). FY27 includes increased costs due to profile reduction and loss of EOQ. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 17 of 29 P-1 Line #13 Volume 1 - 229 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/UPX 29(V) IFF and TACAN PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 20.754 1 7.232 Spares 0.854 0.298 System Engineering 0.202 0.070 Technical Engineering Services 0.990 0.345 Other Costs 1.714 Total 3 0.597 24.514 1 8.542 Description: The UPX-29 Interrogator System is a centralized Mark XIIA interrogator and target processor. It employs a cooperative challenge and reply technique to positively identify friendly platforms. The system is capable of interrogating Mark XII, Mark XIIA, International Civil Aviation Organization (ICAO), or Federal Aviation Administration (FAA)-compliant IFF transponders using a standard shipboard interrogator set, a target processor, and an Electronically Steerable Antenna (ESA) system. TACAN is a navigational beacon system that provides azimuth, slant range, and station identification information to TACAN equipped aircraft, permitting 24/7, all weather landing operations. Contract Data: Quantity Unit Cost Option 3 6.918 Option 1 7.232 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 BAE SS/FFP Jun 2025 FY 2027 DDG 150 BAE SS/FFP Jun 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 DDG 145 Nov 2035 29 24 Required Award Date Jun 2031 FY 2027 DDG 150 Aug 2040 29 24 Mar 2036 Competition/Second Source Initiatives: N/A Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 18 of 29 P-1 Line #13 Volume 1 - 230 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: CEC PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 16.602 1 5.786 System Engineering 1.446 0.504 Technical Engineering Services 0.923 0.322 Other Costs 1.101 Total 3 0.383 20.072 1 6.995 Description: Cooperative Engagement Capability (CEC) is a sensor netting system which distributes sensor data from each CEC equipped ship, aircraft, and/or Cooperating Unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data rate sensor and engagement data distribution network. Contract Data: Quantity Unit Cost Option 3 5.534 Option 1 5.786 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 L3 TECHNOLOGIES/ RAYTHEON C/FFP Aug 2025 FY 2027 DDG 150 L3 TECHNOLOGIES/ RAYTHEON C/FFP Jun 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 40 18 Jan 2031 FY 2027 DDG 150 Aug 2040 40 18 Oct 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. Contract Data Notes: USG-2B CEC Hardware - Contractor: L3 Technologies PAAA Antenna - Contractor: Raytheon LI 2122 - DDG-51 Navy UNCLASSIFIED Page 19 of 29 P-1 Line #13 Volume 1 - 231 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: STC 3 IVCS PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Qty ($ M) Major Hardware 3 Total Cost (Each) ($ M) 16.969 1 5.885 Spares 0.913 0.317 System Engineering 3.089 1.071 Technical Engineering Services 0.811 0.281 Other Costs 4.458 Total 3 1.546 26.240 1 9.100 Description: A solid state integrated voice communication system (IVCS) for application with the AEGIS combat system. Contract Data: Quantity Unit Cost Option 3 5.656 Option 1 5.885 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 DRS Systems, Inc. C/FFP Sep 2025 FY 2027 DDG 150 DRS Systems, Inc. C/FFP Sep 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 46 12 Jan 2031 FY 2027 DDG 150 Aug 2040 46 12 Oct 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 20 of 29 P-1 Line #13 Volume 1 - 232 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AEGIS WEAPON SYSTEM (MK-7) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 253.112 1 138.678 System Engineering 3.046 Technical Engineering Services 2.866 1.570 Other Costs 44.393 24.323 Logistics Support 34.838 19.088 Combat System Integration 127.462 Total 3 1.669 69.836 465.717 1 255.164 Description: AEGIS is a fast reaction, high firepower, all weather weapon system incorporating a high degree of system availability and effectiveness. It consists of a multi-function phase/plane array radar, high powered illuminators, advanced missile guidance and fully digitalized and integrated combat ship control for radar, weapons and command and decision. An Operational Readiness Test System performs continuous online assessment and fault detection. Contract Data: Quantity Unit Cost New 3 84.371 Option 1 138.678 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 TBD TBD Jun 2026 FY 2027 DDG 150 TBD TBD Feb 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 DDG 145 Nov 2035 29 36 Required Award Date Jun 2030 FY 2027 DDG 150 Aug 2040 29 36 Mar 2035 Competition/Second Source Initiatives: Multiple contract arrangements (sole source/competitive) Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. AWS equipment procurements are partially funded with Advance Procurement (AP) funds. MK-7 FY25 includes savings due to Economic Ordering Quantity (EOQ). FY27 reflects projected cost estimates and also includes investments to Land Based Test Sites (LBTS) to reduce technical risks of planned Aegis system upgrades. Contract Data Notes: LI 2122 - DDG-51 Navy UNCLASSIFIED Page 21 of 29 P-1 Line #13 Volume 1 - 233 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2122 / DDG-51 Equipment Item: AEGIS WEAPON SYSTEM (MK-7) PARM Code: N/A AWS Antenna and Signal Processors - Contractor: Lockheed Martin Fire Control System Transmitter - Contractor: Raytheon AWS Director/Director Controller - Contractor: General Dynamics Equipment contracts are planned for new contract awards for FY2025 and follow ships. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 22 of 29 P-1 Line #13 Volume 1 - 234 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: AN/SPY-6(V)1 (AMDR) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 591.923 1 205.981 System Engineering 32.255 11.224 Technical Engineering Services 25.331 8.815 Other Costs 15.822 5.506 Logistics 27.545 Total 3 9.585 692.876 1 241.111 Description: The AN/SPY-6(V)1 Air and Missile Defense Radar (AMDR) suite consists of an S-Band radar (AMDR-S), an X-band radar (via SPQ-9B starting with DDG 119), and a Radar Suite Controller (RSC). AMDR will provide multi-mission capabilities, simultaneously supporting both long range, exoatmospheric detection, tracking and discrimination of ballistic missiles, as well as Area and Self Defense against air and surface threats. Contract Data: Quantity Unit Cost Option 3 197.308 New 1 197.764 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 RAYTHEON C/FPIF Feb 2025 FY 2027 DDG 150 TBD C/CPIF Feb 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 24 36 Nov 2030 FY 2027 DDG 150 Aug 2040 24 36 Aug 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 23 of 29 P-1 Line #13 Volume 1 - 235 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: VLS MK 41 PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 170.425 1 59.101 Ancillary Equipment 5.494 1.905 Technical Data and Documentation 0.996 0.345 System Engineering 20.944 7.263 Technical Engineering Services 20.883 7.242 Other Costs 1.244 Total 3 0.433 219.986 1 76.289 Description: The VLS is a Missile Launching System which provides Surface Combatants with a launcher to carry, prepare for launch and fire, Anti-Air Warfare, Strike/Surface Warfare, and Anti-Submarine Warfare weapons. The MK-41 VLS Launchers consist of twelve modules comprised of eight cells each. Contract Data: Quantity Unit Cost Option 3 56.808 Option 1 59.101 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 LOCKHEED MARTIN C/FFP Apr 2025 FY 2027 DDG 150 LOCKHEED MARTIN C/FFP Jan 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 34 24 Jan 2031 FY 2027 DDG 150 Aug 2040 34 24 Oct 2035 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 24 of 29 P-1 Line #13 Volume 1 - 236 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 45 Light Weight Gun (LWG) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 67.182 1 23.413 Spares 0.574 0.200 System Engineering 8.118 2.829 Technical Engineering Services 4.361 1.520 Other Costs 10.517 Total 3 3.665 90.752 1 31.627 Description: The 5" 62 caliber MK 45 Mod 4 Gun is a digitized high energy system with the capability to automatically select, load and fire different types of 5"/62 caliber projectiles. Contract Data: Quantity Unit Cost Option 3 22.394 Option 1 23.413 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 BAE AD/MCNALLY Various Aug 2025 FY 2027 DDG 150 BAE AD/MCNALLY Various Jun 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2025 DDG 145 Nov 2035 40 24 Required Award Date Jul 2030 FY 2027 DDG 150 Aug 2040 40 24 Apr 2035 Competition/Second Source Initiatives: Sole Source Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. Contract Data notes: Gun Mount contract: BAE Armament Division - Sole Source Lower Hoist contract: McNally - Sole Source LI 2122 - DDG-51 Navy UNCLASSIFIED Page 25 of 29 P-1 Line #13 Volume 1 - 237 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 37 TOMAHAWK PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 16.031 1 5.587 Spares 3.387 1.181 System Engineering 9.673 3.371 Technical Engineering Services 8.645 3.013 Other Costs 13.267 Total 3 4.623 51.003 1 17.775 Description: The Tactical Tomahawk Weapon Control System (TTWCS) is an open system architecture of work stations, processors, printers, fiber optic Local Area Network (LAN) and the Navy Standard Mass Measurement storage device which provides target data management, engagement planning, weapon selection and initiation and launch functions for the TOMAHAWK cruise missile. Contract Data: Quantity Unit Cost Option 3 5.344 Option 1 5.587 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 NSWC PT HUENEME WR Jun 2026 FY 2027 DDG 150 NSWC PT HUENEME WR Aug 2028 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 24 12 Nov 2032 FY 2027 DDG 150 Aug 2040 21 12 Nov 2037 Competition/Second Source Initiatives: Navy construction Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 26 of 29 P-1 Line #13 Volume 1 - 238 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: PHALANX (CIWS) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 23.027 1 8.025 System Engineering 1.478 0.515 Technical Engineering Services 1.775 0.619 Other Costs 2.847 Total 3 0.992 29.127 1 10.151 Description: Phalanx Close-In Weapon System (CIWS) provides fast reaction terminal defense against anti-ship missiles, aircraft, helicopters, low-slow flyers (e.g. unmanned aerial vehicles) and surface threats. The system is an automatic, self-contained unit consisting of search/track radar, threat evaluation and fire control subsystem, and a 20 mm M61A1 Gatling gun subsystem all mounted in a single structure requiring a minimum of integration with other ship systems. Contract Data: Quantity Unit Cost Option 3 7.676 Option 1 8.025 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 RAYTHEON SS/FFP Dec 2024 FY 2027 DDG 150 RAYTHEON SS/FFP Dec 2026 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 36 24 Nov 2030 FY 2027 DDG 150 Aug 2040 36 24 Aug 2035 Competition/Second Source Initiatives: Sole Source Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 27 of 29 P-1 Line #13 Volume 1 - 239 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SPQ-9B Radar PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 27.851 1 9.706 Spares 0.367 0.128 System Engineering 1.452 0.506 Technical Engineering Services 1.544 0.538 Other Costs 1.709 Total 3 0.595 32.923 1 11.473 Description: The AN/SPQ-9B Radar detects and tracks low flying Anti-Ship Missile targets in heavy clutter. The mission of the AN/SPQ-9B includes the capability to detect and classify periscopes with the completion and incorporation of a Periscope Detection and Discrimination (PDD) capability designed to operate concurrently with the AN/SPY-6 capability. Contract Data: Quantity Unit Cost Option 3 9.284 Option 1 9.706 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 DRS Laurel Technologies C/FFP Sep 2025 FY 2027 DDG 150 DRS Laurel Technologies C/FFP Sep 2027 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 41 30 Dec 2029 FY 2027 DDG 150 Aug 2040 41 30 Sep 2034 Competition/Second Source Initiatives: Competitive Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 28 of 29 P-1 Line #13 Volume 1 - 240 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK-38 Gun Weapon System (GWS) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 3 Total Cost (Each) ($ M) 19.055 1 6.640 Technical Data and Documentation 0.309 0.108 System Engineering 1.903 0.663 Technical Engineering Services 0.219 0.076 Other Costs 1.545 Total 3 0.539 23.031 1 8.026 Description: The MK-38 Gun Weapon System (GWS) is a single barrel, lightweight, remote controlled, automatic and stabilized 30mm machine gun system with day and night sensors and eye-safe laser range finder to provide automatic target detection, tracking and engagement. Contract Data: Quantity Unit Cost New 3 6.352 Option 1 6.640 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 DDG 145 TBD SS/FFP Jun 2027 FY 2027 DDG 150 TBD SS/FFP Jun 2029 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 DDG 145 Nov 2035 36 18 May 2031 FY 2027 DDG 150 Aug 2040 36 18 Feb 2036 Competition/Second Source Initiatives: N/A Remarks: Note: Months Required Before Delivery reflect timeline for earliest ship delivery date of each Program Year. Additional deliveries for each program year may have a higher number of Months Required Before Delivery based on shipyard required delivery dates. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 29 of 29 P-1 Line #13 Volume 1 - 241 === page 292 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 242 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 First System (2027) Award Date: January 2018 First System (2027) Completion Date: July 2024 Cost Elements Production Leadtime (Months) Interval Between Systems: 12 Months When Required* (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) SHIP CONSTRUCTION ECONOMIC ORDER QUANTITY (EOQ) SHIP Construction EOQ FY23 Ships VARIOUS VARIOUS - - 0.000 - - - - SHIP Construction EOQ FY24 Ships VARIOUS VARIOUS - - 0.000 - - - - SHIP Construction EOQ FY25 Ships VARIOUS VARIOUS - - 0.000 - - - - SHIP Construction EOQ FY26 Ships VARIOUS VARIOUS 41.500 - 0.000 - - - - SHIP Construction EOQ FY27 Ships VARIOUS VARIOUS - - - - - SHIP Construction EOQ FY29 Ships VARIOUS VARIOUS - - 0.000 502.271 - - - SHIP Construction EOQ FY30 Ships VARIOUS VARIOUS - - 0.000 502.271 - - - SHIP Construction EOQ FY31 Ships VARIOUS VARIOUS - - 0.000 502.305 - - - SHIP Construction EOQ FY32 Ships VARIOUS VARIOUS - 0.000 251.157 - - - - 1,758.004 - - - Total: SHIP CONSTRUCTION ECONOMIC ORDER QUANTITY (EOQ) 41.500 1,000.000 1,000.000 0.000 AWS EOQ AWS EOQ FY24 Ships VARIOUS VARIOUS - - 0.000 - - - - AWS EOQ FY25 Ships VARIOUS VARIOUS - - 0.000 - - - - AWS EOQ FY26 Ships VARIOUS VARIOUS - - 0.000 - - - - AWS EOQ FY27 Ships VARIOUS VARIOUS - - 0.000 - - - - - - - - - - - Total: AWS EOQ Other GFE (16) 06 VARIOUS - - 0.000 - - - - CBSP AP for FY26 Ships 06 VARIOUS - - 0.000 - - - - CBSP AP for FY27 Ships 06 VARIOUS - - 0.000 - - - - CBSP AP for FY25 Ships (17) 18 VARIOUS 20.862 - 0.000 - - - - NMT AP for FY27 Ships 18 VARIOUS 20.862 - 0.000 - - - - Congressional Added AP for Shipyard Infrastructure - - - 450.000 0.000 - - - - Congressional Added AP for Wage Enhancements - - - 300.000 0.000 - - - - Total: Other GFE 41.724 750.000 - - - - - Total Advance Procurement/Obligation Authority 83.224 1,750.000 - - - - NMT AP for FY26 Ships 1,758.004 *Note: "When Required" is the number of months required before ship delivery. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 1 of 3 P-1 Line #14 Volume 1 - 243 === page 294 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 2122 / DDG-51 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) SHIP CONSTRUCTION ECONOMIC ORDER QUANTITY (EOQ) SHIP Construction EOQ FY25 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY26 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY27 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY29 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY30 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY31 Ships VARIOUS VARIOUS - - 0.000 SHIP Construction EOQ FY32 Ships VARIOUS VARIOUS - - 0.000 Total: SHIP CONSTRUCTION ECONOMIC ORDER QUANTITY (EOQ) - AWS EOQ AWS EOQ FY24 Ships VARIOUS VARIOUS - - 0.000 AWS EOQ FY25 Ships VARIOUS VARIOUS - - 0.000 AWS EOQ FY26 Ships VARIOUS VARIOUS - - 0.000 AWS EOQ FY27 Ships VARIOUS VARIOUS - - 0.000 Total: AWS EOQ - Other GFE (16) 06 VARIOUS - - 0.000 CBSP AP for FY26 Ships 06 VARIOUS - - 0.000 CBSP AP for FY27 Ships 06 VARIOUS - - 0.000 CBSP AP for FY25 Ships (17) 18 VARIOUS - - 0.000 NMT AP for FY27 Ships 18 VARIOUS - - 0.000 Congressional Added AP for Shipyard Infrastructure - - - - 0.000 Congressional Added AP for Wage Enhancements - - - - 0.000 NMT AP for FY26 Ships Total: Other GFE - Total Advance Procurement/Obligation Authority - Description: There is no FY 2027 Advance Procurement request. FY23 - FY24 AP is required for shipbuilder and AEGIS Weapon System (AWS) Economic Order Quantity procurements for material items to achieve savings for the FY23-FY27 MYP ships. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 2 of 3 P-1 Line #14 Volume 1 - 244 === page 295 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Date: April 2026 P-1 Line Item Number / Title: 2122 / DDG-51 FY24 - FY25 AP is required to achieve Economic Order Quantity savings and maintain system configuration for the Commercial Broadband Satellite Program (CBSP) (for FY 25 - FY27 ships) and for the Navy Multiband Terminal (NMT) system (for FY26 and FY27 ships). *Note: "When Required" is the number of months required before ship delivery. Footnotes: (16) The Commercial Broadband Satellite Program (CBSP) provides SATCOM services, monitors the integrity of the end-to-end system, enables bandwidth management to optimize the use of leased SATCOM capabilities, and accounts for security and information assurance requirements in support of naval operations. CBSP procurements for FY25 - FY27 ships are required in FY24 to maintain configuration across the FY23-FY27 Multi-year Procurement (MYP). (17) The Navy Multiband Terminal (NMT) provides protected, survivable, Resilient Command, Control, and Communications (RC3) for Naval forces in a Denied, Disrupted, Intermittent, and Limited (DDIL) communications environment. NMT procurements for FY26 - FY27 ships are required in FY25. LI 2122 - DDG-51 Navy UNCLASSIFIED Page 3 of 3 P-1 Line #14 Volume 1 - 245 === page 296 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 246 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2127 / Littoral Combat Ship (LCS) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Prior Years 33 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 33 Total Gross/Weapon System Cost ($ in Millions) 16,934.018 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 16,934.018 Less PY Advance Procurement ($ in Millions) 158.893 - - - - - - - - - - 158.893 Less Cost To Complete ($ in Millions) 587.737 - - - - - - - - - - 587.737 9.400 - - - - - - - - - - 9.400 Less Section 8121 Inflation Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) 16,177.988 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 16,177.988 Full Funding TOA ($ in Millions) 16,177.988 - - - - - - - - - - 16,177.988 Plus CY Advance Procurement ($ in Millions) 158.893 - - - - - - - - - - 158.893 Plus Cost To Complete ($ in Millions) 524.521 48.000 5.766 9.450 - 9.450 - - - - - 587.737 9.400 - - - - - - - - - - 9.400 48.000 5.766 9.450 0.000 9.450 0.000 0.000 0.000 0.000 - 16,934.018 Plus Section 8121 Inflation Funding ($ in Millions) Total Obligation Authority ($ in Millions) 16,870.802 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 1,513.347 65.094 89.186 24.167 - 24.167 - - - - - 1,691.794 Total ($ in Millions) 18,384.149 113.094 94.952 33.617 - 33.617 - - - - - 18,625.812 - - - - - - - - - 513.152 Gross/Weapon System Unit Cost ($ in Millions) 513.152 - Description: Provides for the design, construction, integration, and testing of the Littoral Combat Ship (LCS) including ordnance, government furnished equipment (GFE), plans and change order costs. LCS deploys focused-mission packages to execute surface warfare (SUW) and mine countermeasures (MCM) operations. LCS also possesses inherent capabilities, regardless of the mission package installed, including intelligence, surveillance, and reconnaissance (ISR), anti-terrorism/force protection (AT/FP), air warfare self-defense, joint littoral mobility, and logistic support for movement of personnel and supplies. LCS SUW ships will also include maritime interdiction/interception operations (MIO). LCS MCM ships will incorporate unmanned vehicles to conduct mine hunting and mine sweeping missions. This relatively small, shallow-draft, high-speed surface combatant complements the U.S. Navy's Surface Fleet by operating in environments where it is impossible or undesirable to employ larger deeper-draft, multi-mission ships. LCS can deploy independently to overseas littoral regions or remain on station for extended periods of time either with a battle group or through a forward-basing arrangement. LCS will operate with Carrier Strike Groups, Surface Action Groups, or independently as dictated by the mission and environment. Additionally, LCS can operate cooperatively with the U.S. Coast Guard and Allies. LI 2127 - Littoral Combat Ship (LCS) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #15 Volume 1 - 247 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2127 / Littoral Combat Ship (LCS) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft LM AUSTAL 115.3m 17.5m 3089 mt 4.3m 127.6m 31.6m 2842 mt 4.4m Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date LCS 31 Jan 2019 82 months 65 months Nov 2025 Nov 2026 Oct 2027 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Jul 2003 Dec 2003 Contract Design May 2004 Dec 2004 Detail Design Dec 2004 Jun 2007 Request for Proposals N/A Jan 2010 Design Agent LOCKHEED MARTIN AUSTAL Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C Justification: FY 2027 requests $9.450 million for LCS 31 Water Jet repairs. LI 2127 - Littoral Combat Ship (LCS) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #15 Volume 1 - 248 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2127 / Littoral Combat Ship (LCS) FY 2019 Qty Cost Categories Total Cost (Each) Plan Costs ($ M) 3 Basic Construction/Conversion 13.783 1,412.494 Change Orders 16.384 Electronics 45.312 Hull, Mechanical, and Electrical (HM&E) 13.705 Ordnance 29.793 Other Cost 117.472 Total Ship Estimate 1,648.943 Less Cost to Complete FY 2023 6.983 Less Cost to Complete FY 2024 23.000 Less Cost to Complete FY 2025 27.900 Less Cost to Complete FY 2026 5.766 Less Cost to Complete FY 2027 9.450 4.600 Less Section 8121 Inflation Funding FY 2023 Net P-1 Funding 1,571.244 Remarks: Added $9.450 million of FY 2027 cost to complete to finance LCS 31 Water Jet repairs. LI 2127 - Littoral Combat Ship (LCS) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #15 Volume 1 - 249 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2127 / Littoral Combat Ship (LCS) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 31 LOCKHEED MARTIN 2019 Jan 2019 Jun 2020 Nov 2025 LI 2127 - Littoral Combat Ship (LCS) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #15 Volume 1 - 250 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2128 / FFG-Frigate Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Subsequent Year Full Funding ($ in Millions) Less Section 8121 Inflation Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) 2 5,279.253 Plus Cost To Complete ($ in Millions) Plus Section 8121 Inflation Funding ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 5,379.253 0.000 100.000 To FY 2031 Complete Total 6.000 - - - - - - - - - - 6.000 400.000 - - - - - - - - - - 400.000 233.200 - - - - - - - - - - 233.200 309.600 - - - - - - - - - - 309.600 4,330.453 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 4,430.453 - - - - - - - - 233.200 4,663.653 4,330.453 Plus CY Advance Procurement ($ in Millions) FY 2025 6.000 309.600 4,646.053 233.200 233.200 400.000 633.200 100.000 100.000 - - - - - - - - - - - - - - - - - 6.000 - - - - - - - - - 400.000 - - - - - - - - - 309.600 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 5,379.253 100.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) - Total ($ in Millions) 4,646.053 Gross/Weapon System Unit Cost ($ in Millions) 2,639.627 633.200 - 100.000 - - - - - - - - - 0.000 - - - - - - - - 5,379.253 - - - - - - - - 2,689.627 Description: The Navy reached a comprehensive settlement to terminate the last four ships of the Constellation Class Frigate Program (FFG 64-67) with the prime contractor, Fincantieri Marinette Marine (FMM). While work continues on the first two ships, USS Constellation (FFG 62) and USS Congress (FFG 63), those ships remain under Navy review. No funds are requested for the procurement of new-built Constellation FFGs in FY26 and beyond. Funds appropriated in FY26 are exclusively for Frigate Industrial Base and Workforce development. The Guided Missile Frigate (FFG 62 Class) is a more lethal and survivable multi-mission small surface combatant. With the FFG 62 Class, the Navy will maximize the small surface combatant capabilities in the Anti-Surface Warfare (SUW), Anti-Submarine Warfare (ASW), Electronic Warfare/Information Operations (EW/IO), Air Warfare (AW) mission areas, and survivability while keeping the ship affordable and as a part of a "high-low" mix of surface ships. The FFG 62 Class Capability Development Document was JROC approved in Feb 2019 and completed Milestone B, an informed Independent Cost Estimate, and award of the Detail Design & Construction contract in April 2020. LI 2128 - FFG-Frigate Navy UNCLASSIFIED Page 1 of 4 P-1 Line #16 Volume 1 - 251 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2128 / FFG-Frigate Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date 496 ft 65 ft 7406 tons 18 ft FFG 62 (1) Apr 2020 42 months 0 months FFG 63 (2) May 2021 31 months 0 months (3) FFG 65 FFG 66 FFG 67 Jun 2022 May 2023 May 2024 May 2024 19 months 0 months Dec 2025 Dec 2025 Sep 2031 19 months 0 months Dec 2025 Dec 2025 Sep 2031 Dec 2025 Dec 2025 Sep 2031 Dec 2025 Dec 2025 Sep 2031 FFG 64 Design Schedule Start / Issue Complete / Response Issue Date for TLR Feb 2017 Oct 2017 Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design Feb 2018 May 2019 Detail Design Apr 2020 N/A Request for Proposals Jun 2019 Sep 2019 Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Class C Estimate Footnotes: (1) (2) (3) Delivery date is TBD based on continuing Navy review. Delivery and Start of Construction dates are TBD based on continuing Navy review. FFG 64-FFG 67 delivery dates reflect termination for convenience of the Government. LI 2128 - FFG-Frigate Navy UNCLASSIFIED Page 2 of 4 P-1 Line #16 Volume 1 - 252 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2128 / FFG-Frigate Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 FY 2020 Cost Categories Plan Costs Basic Construction/Conversion Qty FY 2021 Total Cost (Each) ($ M) 1 206.706 613.380 Qty FY 2022 Total Cost (Each) Qty ($ M) 1 (Each) 38.744 FY 2023 Total Cost ($ M) 0 675.460 Qty (Each) 126.600 357.556 ($ M) 0 131.005 253.385 - Qty FY 2026 Total Cost (Each) ($ M) 0 112.008 764.429 Qty Total Cost (Each) ($ M) 0 100.000 Change Orders 10.187 24.679 Electronics 292.158 312.187 205.937 289.070 316.471 - Hull, Mechanical, and Electrical (HM&E) 36.934 29.218 24.418 23.845 28.293 - Ordnance 47.448 50.252 46.490 49.737 89.889 - Other Cost 44.532 48.563 44.615 51.899 33.158 1,251.345 1,179.103 805.616 798.941 1,344.248 Total Ship Estimate - FY 2024 Total Cost - - 100.000 Less Advance Procurement FY 2020 - - - 6.000 Less Subsequent Full Funding FY 2025 - - - - 233.200 - 76.580 64.940 54.308 98.759 - Less Cost to Complete FY 2025 Less Section 8121 Inflation Funding FY 2023 Net P-1 Funding 105.413 105.000 49.400 68.400 86.800 1,040.932 1,053.123 672.276 651.833 - - 1,012.289 100.000 Remarks: Procurement and outfitting of FFG LBES funded via Plans; FY23: $105.3M, FY24: $111.7M, FY25: $51.8M (FY25 shown on FY24 ship). FY23 Other Cost includes $6.0M of FY20 advance procurement funds to support engineering efforts for the Land Base Engineering Site. FY23 includes a $50M Congressional Add for Frigate industrial base and workforce development. This is shown under the Basic Construction cost category. FY24 includes a $50M Congressional Add for Frigate industrial base and workforce development. This is shown under the Basic Construction cost category. FY25 includes a $100M Congressional Add for Frigate industrial base and workforce development. This is shown as Subsequent Full Funding under the FY24 Basic Construction cost category. FY25 rescission of $151.230 million is not reflected in FY25 controls. FY26 Gross Weapons System cost reflects a $100M Congressional Add for Frigate industrial base and workforce development. This is shown under the Basic Construction cost category. LI 2128 - FFG-Frigate Navy UNCLASSIFIED Page 3 of 4 P-1 Line #16 Volume 1 - 253 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2128 / FFG-Frigate Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction FFG 62 (1) Fincantieri Marinette Marine 2020 Apr 2020 Sep 2022 Delivery Date FFG 63 (2) Fincantieri Marinette Marine 2021 May 2021 FFG 64 (3) Fincantieri Marinette Marine 2022 Jun 2022 Dec 2025 Dec 2025 FFG 65 Fincantieri Marinette Marine 2023 May 2023 Dec 2025 Dec 2025 FFG 66 Fincantieri Marinette Marine 2024 May 2024 Dec 2025 Dec 2025 FFG 67 Fincantieri Marinette Marine 2024 May 2024 Dec 2025 Dec 2025 Footnotes: (1) (2) (3) Delivery date is TBD based on continuing Navy review. Delivery and Start of Construction dates are TBD based on continuing Navy review. FFG 64-FFG 67 delivery dates reflect termination for convenience of the Government. LI 2128 - FFG-Frigate Navy UNCLASSIFIED Page 4 of 4 P-1 Line #16 Volume 1 - 254 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2133 / FF(X) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 - - - Gross/Weapon System Cost ($ in Millions) 0.000 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Less Prior Year Full Funding ($ in Millions) - - - 242.000 - 242.000 - 0.000 0.000 0.000 1,429.000 0.000 1,429.000 0.000 Plus Prior Year FF ($ in Millions) - - 242.000 Full Funding TOA ($ in Millions) - - 242.000 Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - 0.000 0.000 242.000 1 1,671.000 - 0.000 1 1,671.000 - - - - 1,429.000 - - 1,429.000 - 1,429.000 0.000 FY 2028 1,429.000 FY 2029 - FY 2030 1 To FY 2031 Complete - 18 22 28,774.467 36,064.467 0.000 1,947.000 0.000 3,672.000 - 297.000 - 912.000 297.000 297.000 1,650.000 1,650.000 1,650.000 0.000 912.000 Total 2 2,760.000 2,760.000 - 28,774.467 28,774.467 - 1,209.000 242.000 34,613.467 242.000 34,855.467 1,209.000 912.000 2,760.000 28,774.467 36,064.467 912.000 2,760.000 28,774.467 36,064.467 1,836.000 1,598.582 1,639.294 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Millions) - - 242.000 - 1,429.000 - 1,429.000 1,671.000 - 1,671.000 297.000 - 1,650.000 1,947.000 - Description: The FF(X) Frigate is a strategic necessity to close a significant shortfall in the Navy's small surface combatant inventory and to build a more balanced, flexible fleet. Frigate directly supports the 2025 National Security Strategy which calls for, "A more suitable Navy presence to control sea lanes, to thwart illegal and other unwanted migration, to reduce human and drug trafficking, and to control key transit routes in a crisis". FF(X) will be a vanguard of the Navy's Hedge Strategy, within the General-Purpose Force handling routine missions across the globe and freeing the Main Battle Force to remain focused on high-end combat. FF(X) will act as the command ship for Tailored Offsets, specifically Robotic and Autonomous Systems (RAS), and integrating with RAS to lead Tailored Forces into a cohesive warfighting approach. As the low-end anchor of the Golden Fleet high-low mix, the Frigate will relieve high end assets such as Arleigh Burke-Class destroyers from missions that do not require large multi mission combatants, including maritime interdiction and counter drug operations. Its primary role is to execute surface warfare, Counter-Unmanned Aerial Systems (C-UAS), and Command and Control (C2) of Unmanned Systems missions as well as others as enabled through containerized payloads, all through a highly producible, cost effective and adaptable platform. These containerized payload capabilities are aligned with and supported by the Navy's dedicated containerized payloads program, enabling rapid integration and fielding of mission modules, including containerized Vertical Launch System (VLS) payloads. This ensures that while Flight I of the FF(X) Class (currently planned as at least the first 2 ships) does not incorporate a traditional fixed VLS battery, it retains the capability to deploy VLS-equivalent payloads through modular, mission-tailored configurations. To deliver at speed and scale, the Navy is acquiring its new class of Frigates based on Huntington Ingalls Industry's (HII) Legend-class National Security Cutter (NSC) design - a proven American built ship that has been operational for 17 years with ten delivered cutters, protecting U.S. interests at home and abroad. Huntington Ingalls Industries, Incorporated, Pascagoula, MS will construct the lead and first follow ships. In addition to program maturity through the proven NSC design as the FF(X) baseline, the FF(X) program is also utilizing equipment, systems and material from the cancelled NSC 11 on hand at the shipbuilder to support execution and accelerated production of the first FF(X) in FY27. Frigate will take the same validated flight-upgrade approach as our Arleigh Burke DDG-51 program - incorporating improvements over successive flights to evolve the ship's capabilities over time. Flight I Frigates will have minimal adaptations from the existing NSC to start production as quickly as possible. The limited modifications of the NSC baseline to the Flight I Frigate requirements incorporate Navy weapons, combat systems, and communications programs of record, add a flexible weapons station in lieu of the NSC stern boat ramp, add a port-mid-ships boat davit, incorporate shipbuilder recommended producibility enhancements, and change to standard Navy grey paint. Studies for future flights will consider expanded capabilities including Vertical Launch Systems, and Anti-Submarine Warfare systems. FF(X) RAS C2 is enabled through use of Navy warfare system programs of record including the FF(X) combat system and eventually Aegis based Integrated Combat System (ICS), communications systems, and design reservations dedicated to future RAS C2 systems. Design Reservations for unmanned systems will also enable LI 2133 - FF(X) Navy UNCLASSIFIED Page 1 of 18 P-1 Line #17 Volume 1 - 255 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2133 / FF(X) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A "plug-and-play" accommodation of future unmanned systems. FF(X) addition of the flexible weapons station facilitates loadout of containerized payloads, the same payloads as Medium Unmanned Surface Vessel (MUSV) can carry, and ultimately enabling associated benefits of scalable technology, rapid and cost-effective innovation, and tailored missions through containerized missiles or other weapons systems. This approach provides an inherent growth path for VLS and other capabilities through containerized solutions in early flights, reinforcing the platform's adaptability while mitigating cost, schedule, and integration risks associated with fixed VLS installation. With a clear goal of launching the first hull in 2028, and a priority of accelerating Frigates to the fleet, the Frigate acquisition strategy starts with a sole-source Lead Yard Support contract to the same designer and builder of the NSC. The Lead Yard Support contract will complete design work for production, procure long lead material including pre-production efforts to enable rapid transition to construction. Sole source Construction contracts will then follow for the first two ships. The third and following Frigates will be procured with a competitive strategy that will increase fielding rate to the fleet through production at multiple shipyards and expanded the shipbuilding industrial base. The FF(X) out year acquisition schedule, dependent upon authorization, reflects an additional ship in FY29 and another two in FY31, all with similar build profiles. FF(X) 2 has a contract award date of March 2029, with a total duration of 51 months from award to delivery and 48 months from the start of construction to delivery. Delivery is scheduled for June 2033, completion of fitting out (CFO) is March 2034, and obligation work limit date (OWLD) is February 2035. FF(X) 3 and FF(X) 4 both have contract award dates of March 2031, each requiring 63 months from award to delivery and 60 months from the start of construction to delivery. Delivery for both ships is scheduled for June 2036, CFO for both ships is March 2037 and OWLD for both ships is February 2038. The increased build duration for FF(X) 3 and FF(X) 4 reflects the planned transition to additional shipyards, where initial production efforts will require ramp-up of workforce, facilities, and production processes to achieve full-rate efficiency. Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date 421 ft 54 ft 4750 tons 22 ft FF(X) 1 (1) Mar 2027 39 months 36 months Jun 2030 Mar 2031 Feb 2032 Design Schedule Start / Issue Complete / Response Issue Date for TLR Oct 2025 Oct 2025 Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design Dec 2025 Dec 2025 Detail Design Dec 2025 May 2026 Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent LI 2133 - FF(X) Navy UNCLASSIFIED Page 2 of 18 P-1 Line #17 Volume 1 - 256 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 02: Other Warships / BSA 1: Other 2133 / FF(X) Warships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Classification of Cost Estimate: Class C Estimate Footnotes: (1) FF(X)1 construction schedule accelerated through use of the Lead Yard Support contract. Critical Design Review (CDR)/ Complete Design scheduled for completion in May 2026. Design efforts are limited to NSC to FF(X) modifications and expected to support material purchasing and unit pre-fabrication in Summer 2026. Schedule reflects present planning assumptions and may be adjusted as design progress, testing results, and ship integration timelines evolve. LI 2133 - FF(X) Navy UNCLASSIFIED Page 3 of 18 P-1 Line #17 Volume 1 - 257 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 (†) P-1 Line Item Number / Title: 2133 / FF(X) FY 2027 Cost Categories Qty indicates the presence of a P-8a Plan Costs 48.626 (†) Hull, Mechanical, and Electrical (HM&E) 182.916 972.523 Change Orders Ordnance ($ M) 1 Basic Construction/Conversion Electronics Total Cost (Each) 331.073 (†) 28.969 (†) 53.799 Other Cost 53.094 Affordability Initiatives Total Ship Estimate 1,671.000 242.000 Less Prior Year Full Funding FY 2026 Net P-1 Funding 1,429.000 Remarks: FY 2026 funds support long lead time material procurements, design efforts, and advance pre-construction activities to accelerate shipbuilder construction efforts. LI 2133 - FF(X) Navy UNCLASSIFIED Page 4 of 18 P-1 Line #17 Volume 1 - 258 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date FF(X) 1 (1) Huntington Ingalls 2027 Mar 2027 Jun 2027 Jun 2030 FF(X) 2 (2) Huntington Ingalls 2029 Mar 2029 Jun 2029 Jun 2033 FF(X) 3 (3) TBD 2031 Mar 2031 Jun 2031 Jun 2036 FF(X) 4 (4) TBD 2031 Mar 2031 Jun 2031 Jun 2036 Footnotes: (1) FF(X)1 construction schedule accelerated through use of the Lead Yard Support contract. Critical Design Review (CDR)/ Complete Design scheduled for completion in May 2026. Design efforts are limited to NSC to FF(X) modifications and expected to support material purchasing and unit pre-fabrication in Summer 2026. Schedule reflects present planning assumptions and may be adjusted as design progress, testing results, and ship integration timelines evolve. (2) FF(X)2 schedule reflects AP budget request for FF(X) 2 in FY 2028 and not beginning unit pre-fabrication and construction efforts until FY 2029. Schedule reflects present planning assumptions and may be adjusted as design progress, testing results, and ship integration timelines evolve. (3) FF(X)3 schedule reflects assumption of competitive award and potential of award to new shipyards who would require longer durations to facilitize and establish a Frigate production line. Schedule reflects present planning assumptions and may be adjusted as design progress, testing results, and ship integration timelines evolve. (4) FF(X)4 schedule reflects assumption of competitive award and potential of award to new shipyards who would require longer durations to facilitize and establish a Frigate production line. Schedule reflects present planning assumptions and may be adjusted as design progress, testing results, and ship integration timelines evolve. LI 2133 - FF(X) Navy UNCLASSIFIED Page 5 of 18 P-1 Line #17 Volume 1 - 259 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2133 / FF(X) FY 2027 Qty Electronics Total Cost (Each) ($ M) P-35 Items Atalanta Combat System 1 80.737 External Communication Suite (EXCOMM) 1 10.980 Identification Friend/Foe (IFF) 1 7.242 Network Enterprise System 1 12.804 Navy Advanced Extremely High Frequency (AEHF) Multiband Terminal (NMT) 1 17.980 Surface Electronic Warfare Improvement Program (SEWIP) 1 15.502 Tactical COMINT System 1 24.569 SPS-77 Radar 1 P-35 Items Subtotal 10.585 180.399 Major Items Moriah Wind System (MWS) 1 9.722 Major Items Subtotal 9.722 Other Cost Elements Other Electronics 140.952 Other Cost Elements Subtotal 140.952 Total Electronics 331.073 Remarks: Other Electronics include Advanced Training Domain (ATD), Navy Electronic Chart Display Information System (ECDIS), Global Positioning System (GPS) Global Positioning Navigation and Timing Service (GPNTS), Tactical Air Navigation (TACAN), CRYPTO, Automatic Identification System (AIS), Automated Digital Network System (ADNS), Intelligence Carry-On Program (ICOP), Digital Hybrid Speed Log (DHYSL), Digital Flux Gate Magnetic Compass (DFGMC), Joint Tactical Terminal (JTT), Mids on Ship-MOD, Command and Control Processor (C2P), Battle Force Tactical Network (BFTN), Naval Modular Automated Communications System (NAVMACS), Antennas and other systems. LI 2133 - FF(X) Navy UNCLASSIFIED Page 6 of 18 P-1 Line #17 Volume 1 - 260 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2133 / FF(X) FY 2027 Qty Hull, Mechanical, and Electrical (HM&E) Total Cost (Each) ($ M) Major Items Advanced Stabilized Glide Slope Indicator (ASGSI) 1 1.525 Wave-Off Light System 1 1.347 Flight Deck Status & Signaling 1 6.400 Major Items Subtotal 9.272 Other Cost Elements Other HM&E 19.697 Other Cost Elements Subtotal 19.697 Total Hull, Mechanical, and Electrical (HM&E) 28.969 Remarks: Other HM&E includes Chemical Biological (CHEM BIO), Radiation Detection (RADIAC) and other systems. LI 2133 - FF(X) Navy UNCLASSIFIED Page 7 of 18 P-1 Line #17 Volume 1 - 261 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 P-1 Line Item Number / Title: 2133 / FF(X) FY 2027 Qty Ordnance Total Cost (Each) ($ M) P-35 Items MK 48 Gun Weapon System (GWS) 1 18.752 MK 49 Rolling Airframe Missile (RAM) 1 13.805 P-35 Items Subtotal 32.557 Major Items Mk 38 Machine Gun System (MGS) 1 MK 53 Decoy Launching System (DLS) (Nulka) 1 Major Items Subtotal 14.600 3.147 17.747 Other Cost Elements Other Ordnance 3.495 Other Cost Elements Subtotal 3.495 Total Ordnance 53.799 LI 2133 - FF(X) Navy UNCLASSIFIED Page 8 of 18 P-1 Line #17 Volume 1 - 262 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Atalanta Combat System PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 65.033 System Engineering 2.835 Technical Engineering Services 2.587 Other Costs 10.282 Total 1 80.737 Description: The Atalanta Combat System is an integrated system that provides doctrine, management, control, and display functionality as well as command and control functionality for all warfare areas. The Combat System will comprise: Command and Decision (C&D) System, Combat System Computing Infrastructure (CSCI), Shipboard Gridlock System/Automatic Correlation (SGS/AC), Weapons Control System (WCS), Operational Readiness Training System (ORTS), Mission Planner (MP), Vehicle Control Domain (VCD), and resource management for the Air Surveillance Radar. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 65.033 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 9 of 18 P-1 Line #17 Volume 1 - 263 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: External Communication Suite (EXCOMM) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 4.301 System Engineering 0.205 Technical Engineering Services 0.340 Other Costs 6.134 Total 1 10.980 Description: External Communication Suite (EXCOMM) is a software programmable tactical radio (with embedded Information Security [INFOSEC]) that provides interoperable Line of Sight/Beyond Line of Sight (LOS/BLOS) C4I capabilities to the fleet. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 4.301 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 10 of 18 P-1 Line #17 Volume 1 - 264 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Identification Friend/Foe (IFF) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 4.919 System Engineering 0.813 Technical Engineering Services 0.519 Other Costs 0.991 Total 1 7.242 Description: The Identification Friend/Foe (IFF) provides a centralized identification system that operates independently to transmit interrogations, detect transponder replies, and process the resulting information for use by a ship's operators and combat weapons system computers. The system provides Modes 1, 2, 3A, C and provides secure, positive ID of Mode 4, Mode S and Mode 5 targets. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 4.919 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 11 of 18 P-1 Line #17 Volume 1 - 265 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Network Enterprise System PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 11.225 System Engineering 0.398 Technical Engineering Services 0.117 Other Costs 1.064 Total 1 12.804 Description: The Network Enterprise System is a highly scalable network, computing, and services infrastructure supporting mission area application hosting and service delivery across a diverse set of Communities of Interest (COIs). It provides Navy tactical/ non-tactical information environment and infrastructure necessary to enable hosting, extended services reach back & reach forward and relay functions. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 11.225 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 12 of 18 P-1 Line #17 Volume 1 - 266 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Navy Advanced Extremely High Frequency (AEHF) Multiband Terminal (NMT) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 16.491 System Engineering 0.349 Technical Engineering Services 0.660 Other Costs 0.480 Total 1 17.980 Description: The Navy Multiband Terminal (NMT) is the Navy's next generation ground terminal for military protected and wideband satellite communications, providing voice, video and data communications. NMT supports protected strategic/tactical warfare communications down to housekeeping and quality of life communications for Sailors, maintaining backwards compatibility with legacy waveforms and systems while ensuring access to current and future Military Satellite Communications (MILSATCOM) capabilities (Advanced Extremely High Frequency [AEHF], Wideband Global Satellite [WGS], and Enhanced Polar Satellite [EPS]). Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 16.491 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 13 of 18 P-1 Line #17 Volume 1 - 267 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Surface Electronic Warfare Improvement Program (SEWIP) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 11.141 System Engineering 0.955 Technical Engineering Services 1.275 Other Costs 2.131 Total 1 15.502 Description: The AN/SLQ-32 SEWIP is a scalable Electronic Warfare enterprise suite that interfaces to the Combat Management System. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning and soft kill protection from anti-ship missiles. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 11.141 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 14 of 18 P-1 Line #17 Volume 1 - 268 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: Tactical COMINT System PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 22.701 System Engineering 0.931 Technical Engineering Services 0.720 Other Costs 0.217 Total 1 24.569 Description: The Tactical COMINT System is the next generation information warfare weapons system, enhancing Ship Signal Exploitation System (SSES) capabilities that detect, classify, and track Signals of Interest (SOI) used in the Tasking, Collection, Processing, Exploitation and Dissemination (TCPED) process. Spectral is scalable, mission configurable and modular, rapidly responding to new threats and/or capabilities. An integrated capability enables data sharing with other systems to support Electromagnetic Maneuver Warfare. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 22.701 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 15 of 18 P-1 Line #17 Volume 1 - 269 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: SPS-77 Radar PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 9.607 System Engineering 0.209 Technical Engineering Services 0.463 Other Costs 0.306 Total 1 10.585 Description: The AN/SPS-77 is a multi-role medium-range 3D surveillance radar system that provides medium range, simultaneous air and surface surveillance in littoral and blue-water operations. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 9.607 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 16 of 18 P-1 Line #17 Volume 1 - 270 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 48 Gun Weapon System (GWS) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 16.073 System Engineering 1.113 Technical Engineering Services 0.374 Other Costs 1.192 Total 1 18.752 Description: The MK 48 MOD 2 Gun Weapon System (GWS) is fully integrated with MK 160 Gun Computer System w/ MK 20 Electro Optical Sight System and MK 110 57mm gun. The MK 160 Gun Fire Control System (GFCS) is the standard USN gun fire control system; the MK 20 Electro-Optical Sensor System (EOSS) is the standard gun optical sight used for gun engagements; and the MK 110 is an automated 57mm gun system used for surface and air engagements of hostile targets. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 16.073 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 17 of 18 P-1 Line #17 Volume 1 - 271 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 2133 / FF(X) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 02 / 1 Equipment Item: MK 49 Rolling Airframe Missile (RAM) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 1 11.833 System Engineering 0.819 Technical Engineering Services 0.275 Other Costs 0.878 Total 1 13.805 Description: The Rolling Airframe Missile (RAM) Guided Missile Weapon System (GMWS) is a lightweight, fast reaction, high-firepower, passive, dual-mode (IR and RF) system. The RAM GMWS is a point defense weapon system, designed to engage and destroy incoming Anti-Ship Cruise Missiles (ASCM), helicopters, and fixed wing aircraft, and to engage and intercept surface craft. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 FF(X) 1 TBD TBD TBD New/Option Quantity Unit Cost 1 11.833 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 FF(X) 1 Jun 2030 0 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 2133 - FF(X) Navy UNCLASSIFIED Page 18 of 18 P-1 Line #17 Volume 1 - 272 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3010 / LPD Flight II Program Elements for Code B Items: N/A Other Related Program Elements: 0604454N Line Item MDAP/MAIS Code: 542 Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) FY 2026 FY 2027 Base FY 2029 To FY 2031 Complete FY 2030 Gross/Weapon System Cost ($ in Millions) 6,140.137 2,062.963 0.000 Less PY Advance Procurement ($ in Millions) 512.100 501.000 - - - - Less Cost To Complete ($ in Millions) 444.500 - - - - - - - - - 60.636 - - - - - - - - Less Prior Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) 524.100 4,598.801 60.636 Plus Prior Year FF ($ in Millions) 524.100 Full Funding TOA ($ in Millions) 5,183.537 Plus CY Advance Procurement ($ in Millions) 1,013.100 Plus Cost To Complete ($ in Millions) Total Obligation Authority ($ in Millions) 6,196.637 1,561.963 0.000 - - - - 1,561.963 2,188.700 - - FY 2028 1 Millions) 1 FY 2027 Total 3 Less Subsequent Year Full Funding ($ in - FY 2027 OOC 0.000 1 1 1 1 - 9 2,188.700 2,648.214 2,421.002 2,805.583 2,807.200 - 21,073.799 373.748 300.000 - 2,042.798 - 444.500 - - 60.636 - - 524.100 - 18,001.765 - - 60.636 - - 524.100 - 18,586.501 - - 2,042.798 - - 444.500 - 21,073.799 - 2,188.700 0.000 - - - - Total 1 2,188.700 - - 2,188.700 - 2,188.700 355.950 2,292.264 2,292.264 - - 2,421.002 - 2,431.835 - 2,421.002 2,431.835 373.748 300.000 - - 355.950 - 355.950 19.158 93.442 103.489 - 103.489 160.904 67.507 1,581.121 93.442 2,648.139 0.000 2,648.139 2,453.168 2,862.257 2,731.835 2,507.200 2,507.200 2,507.200 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 16.388 16.506 49.090 62.659 - 62.659 40.090 120.737 33.970 43.113 504.037 886.590 Total ($ in Millions) 6,213.025 1,597.627 142.532 2,710.798 - 2,710.798 2,493.258 2,982.994 2,765.805 2,550.313 504.037 21,960.389 Gross/Weapon System Unit Cost ($ in Millions) 2,046.712 2,062.963 2,188.700 - 2,188.700 2,648.214 2,421.002 2,805.583 2,807.200 - - 2,341.533 Description: The LPD 17 Flight II is expected to functionally replace LSD-41 Class ships and LSD-49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. Per signed Acquisition Decision Memorandum, LPD 17 Flight II will meet the Capabilities Development Document for LX(R) and shall subsume all previous LX(R) efforts. Name change endorsed in JROCM 093-21, from "Amphibious Ship Replacement LX(R)" to "LPD 17 San Antonio Class Amphibious Transport Dock FLT II." LPD 30 is the first ship of LPD 17 Flight II. The Navy has awarded a Multi-Ship Procurement (MSP) contract in September 2024 for 3 ships (LPD 33, 34, and 35). In total, the 4-ship agreement was awarded simultaneously for LHA 10 and LPD 33-35 and included Advanced Procurement (AP) to acquire Long Lead Time Material (LLTM) and Full Funding. The FY 2027 request for LPD Flight II includes $2,544,650 thousand and quantity of 1 of discretionary and $4,000 thousand and quantity of 0 of mandatory for a total of $2,548,650 thousand and a quantity of 1. The $4,000 thousand of mandatory funds will be used to enhance the U.S surface maritime industrial base productivity specifically for firefighting improvements. The FY 2027 funds are different from the FY 2026 mandatory funds that were not provided for industrial base support. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 1 of 19 P-1 Line #18 Volume 1 - 273 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3010 / LPD Flight II Program Elements for Code B Items: N/A Other Related Program Elements: 0604454N Line Item MDAP/MAIS Code: 542 The FY 2026 spend plan amount for LPD Flight II includes $93,442 thousand and quantity of 0 of discretionary and $880,037 thousand and quantity of 0 of mandatory for a total of $973,479 thousand and a quantity of 0. The FY 2027 - FY 2031 request supports the congressionally mandated minimum of 31 Amphibious Warfare Ships and begins a demand signal for reduced time between ship procurements and alternative sources to achieve a 3.0 Amphibious Ready Group / Marine Expeditionary Unit (ARG/MEU) presence. Note: Government Furnished Equipment (GFE) increases associated with Electronics, Hull Mechanical & Electrical, and Ordnance are driven by renegotiations associated with new contract awards and above normal inflation driven by vendor material increases. Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Systems: 208.5 m 31.9 m 25.3 lmt 7.0 m 684 ft 105 ft 24.9 klt 23 ft LPD FLT II 30 Electronics Ordnance -Mission Systems -C4ISR -Ship Self Defense System (SSDS) -Cooperative Engagement Capability (CEC) -Interrogator System IFF (Identification Friend or Foe) -AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) (1) LPD FLT II 31 Mar 2019 Apr 2020 97 months 85 months Apr 2027 Sep 2028 Aug 2029 106 months 77 months Feb 2029 May 2030 Apr 2031 LPD FLT II 32 (2) Mar 2023 95 months 73 months Feb 2031 Jan 2032 Dec 2032 -RAM Block II -MK 38 Gun -AN/SPQ-9B Radar Set -EASR LPD FLT II 33 Sep 2024 99 months 64 months Dec 2032 Nov 2033 Oct 2034 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Mar 2015 Jun 2016 Contract Design Jun 2016 Jun 2017 Detail Design Dec 2018 Mar 2020 Request for Proposals Jul 2018 Aug 2018 LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 2 of 19 (3) LPD FLT II 34 (4) Sep 2024 121 months 64 months Oct 2034 Sep 2035 Aug 2036 Reissue P-1 Line #18 Reissue Complete / Response Volume 1 - 274 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3010 / LPD Flight II Program Elements for Code B Items: N/A Other Related Program Elements: 0604454N Line Item MDAP/MAIS Code: 542 Design Schedule Start / Issue Design Agent Huntington Ingalls Industries Complete / Response Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C Footnotes: (1) (2) (3) (4) LPD 30: Delivery Date revised from February 2027 to April 2027 based on the shipyard's formal Over Target Schedule (OTS) re-baselining effort due to shipyard labor challenges. LPD 32: Delivery Date revised from June 2030 to February 2031 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 33: Delivery Date revised from September 2031 to December 2032 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 34: Delivery Date revised from September 2033 to October 2034 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 3 of 19 P-1 Line #18 Volume 1 - 275 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 (†) FY 2018 Cost Categories Qty indicates the presence of a P-8a (Each) Plan Costs (†) Hull, Mechanical, and Electrical (HM&E) (†) (†) Other Cost Total Ship Estimate FY 2023 Total Cost (Each) 1 Change Orders Ordnance Qty ($ M) Basic Construction/Conversion Electronics FY 2021 Total Cost Qty ($ M) (Each) 1 FY 2025 Total Cost Qty ($ M) (Each) 1 FY 2027 Total Cost Qty ($ M) Total Cost (Each) 1 ($ M) 1 1,563.849 1,619.981 1,560.000 1,604.532 35.027 93.000 82.500 35.000 1,630.510 43.000 234.448 263.195 256.039 270.887 329.404 59.200 23.022 18.655 26.823 31.269 83.876 102.838 117.032 125.721 144.009 9.000 10.801 7.674 1,985.400 2,112.837 2,041.900 Less Advance Procurement FY 2016 14.000 Less Advance Procurement FY 2019 - Less Advance Procurement FY 2021 - Less Advance Procurement FY 2022 10.508 2,188.700 - - - - - - - 1.000 1.000 - - - 250.000 - - Less Advance Procurement FY 2024 - - - Less Subsequent Full Funding FY 2022 - 60.636 - - - Less Cost to Complete FY 2025 19.158 - - - - Less Cost to Complete FY 2026 93.442 - - - - Less Cost to Complete FY 2027 58.800 44.689 - - - Less Cost to Complete FY 2028 - 110.511 50.393 - - Less Cost to Complete FY 2029 - 67.507 - - Less Prior Year Full Funding FY 2020 - - - Net P-1 Funding 1,800.000 - 2,062.963 247.100 524.100 1,125.801 1,673.000 500.000 1,561.963 - 2,188.700 Remarks: Added additional cost to complete for the following ships: LPD 30 (FY18 ship): Added $58.8M of FY27 cost to complete (CTC) to finance; Degaussing ($26M), Air Conditioning Plant ($16M), Navigation Radar ($16M), and Additional Stowage ($.8M) LPD 31 (FY21 ship): Added $53.4M of FY27 - FY28 CTC to finance; Degaussing ($22M), Air Conditioning Plant ($12M), Navigation Radar ($16M), CANES Compatible Tables ($2.6M), and Additional Stowage ($.8M). The total FY27 cost to complete request of $44.7M finances air conditioning plant ($12.0M), Degaussing System ($22.0M), CANES Compatible Tablets ($2.6M), additional stowage ($0.8M), and Economic Price adjustment ($7.3M). LPD 32 (FY23 ship): Added $56.0M of FY28 & FY29 CTC to finance; Degaussing ($23.7M), Air Conditioning Plant ($12M), Navigation Radar ($16M), CANES Compatible Tables ($2.7M), Cyber/Command and Control Processor System Tech Refresh ($.8M), and Additional Stowage ($.8M). LPD 33 (FY25 ship): The FY 2025 Total Ship Estimate does not show $252,125 thousand of incremental funding funded in FY 2026 mandatory funding. Total ship estimate for FY 2025 is $2,315,088 thousand. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 4 of 19 P-1 Line #18 Volume 1 - 276 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 P-1 Line Item Number / Title: 3010 / LPD Flight II LPD 34 (FY27 ship): The FY 2027 Total Ship Estimate does not show $339,000 thousand of advance procurement funded in FY 2026 mandatory funding. Total ship estimate for FY 2027 is $2,527,700 thousand. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 5 of 19 P-1 Line #18 Volume 1 - 277 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship LPD FLT II 30 (1) LPD FLT II 31 Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date HUNTINGTON INGALLS INDUSTRIES 2018 Mar 2019 Mar 2020 Apr 2027 HUNTINGTON INGALLS INDUSTRIES 2021 Apr 2020 Sep 2022 Feb 2029 LPD FLT II 32 (2) HUNTINGTON INGALLS INDUSTRIES 2023 Mar 2023 Jan 2025 Feb 2031 LPD FLT II 33 (3) HUNTINGTON INGALLS INDUSTRIES 2025 Sep 2024 Aug 2027 Dec 2032 LPD FLT II 34 (4) HUNTINGTON INGALLS INDUSTRIES 2027 Sep 2024 Jun 2029 Oct 2034 LPD FLT II 37 (5) TBD 2028 Sep 2028 Oct 2031 Feb 2037 LPD FLT II 35 (6) HUNTINGTON INGALLS INDUSTRIES 2029 Sep 2024 Apr 2031 Aug 2036 LPD FLT II 38 (7) TBD 2030 Sep 2030 Oct 2033 Feb 2039 TBD 2031 May 2031 Apr 2033 Aug 2038 LPD FLT II 36 Footnotes: (1) (2) (3) (4) (5) LPD 30: Delivery Date revised from February 2027 to April 2027 based on the shipyard's formal Over Target Schedule (OTS) re-baselining effort due to shipyard labor challenges. LPD 32: Delivery Date revised from June 2030 to February 2031 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 33: Delivery Date revised from September 2031 to December 2032 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 34: Delivery Date revised from September 2033 to October 2034 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 37 notional dates reflect estimated construction spans for the ship not yet under contract. The dates are dependent on the establishment of a second build yard for this ship class, which is yet to be determined. Dates will be adjusted based on the outcome of final contract negotiations. (6) (7) LPD 35: Delivery Date revised from September 2035 to August 2036 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LPD 38 notional dates reflect estimated construction spans for the ship not yet under contract. The dates are dependent on the establishment of a second build yard for this ship class, which is yet to be determined. Dates will be adjusted based on the outcome of final contract negotiations. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 6 of 19 P-1 Line #18 Volume 1 - 278 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Electronics Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Mission Systems 1 58.271 1 75.747 C4ISR 1 99.797 1 114.239 Ship Self Defense System (SSDS) 1 25.090 1 30.876 Cooperative Engagement Capability (CEC) 1 12.200 1 17.907 Interrogator System IFF (Identification Friend or Foe) 1 6.649 1 7.840 AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) 1 14.358 1 17.429 P-35 Items Subtotal 216.365 264.038 Major Items HM&E Condition System (HMECS) 1 3.900 1 4.138 Advanced Training Domain (ATD) 1 1.407 1 1.826 AN/WSN-7(RLGN) 1 4.365 1 7.164 Nulka Decoy Launching System (DLS) 1 1.596 1 2.114 Amphibious Assault Direction System (AADS) 1 1.168 1 1.276 RADIAC 1 0.115 1 0.270 AN/UQN-10 1 0.229 1 0.405 DHYSL 1 0.420 1 0.746 Electronic Charting Display and Information Systems-Navy (ECDIS-N) 1 1.970 1 Major Items Subtotal 2.285 15.170 20.224 Miscellaneous Electronics 34.698 38.915 IWS CSI 4.654 6.227 Other Cost Elements Subtotal 39.352 45.142 Total Electronics 270.887 329.404 Other Cost Elements Remarks: Government Furnished Equipment (GFE) increases associated with Electronics are driven by renegotiations associated with new contract awards and above normal inflation driven by vendor material increases LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 7 of 19 P-1 Line #18 Volume 1 - 279 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Hull, Mechanical, and Electrical (HM&E) Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) Major Items Boats (Rigid Inflatable Boat, 7 meter) 1 0.722 1 0.977 Forklift Trucks 7 4.735 7 4.977 Chemical Warfare Detectors 1 1.016 1 1.701 Military Payroll System 1 0.686 1 0.811 Motor Operated Pilot Valve (MOPV) 1 0.839 0 - Oily Water Separator 1 0.345 1 0.390 Plastic Waste Processing EQP 1 0.836 1 0.955 Unclassified Video System (UVS) 1 2.801 1 3.521 Navy enterprise Remote Monitoring (eRM) Major Items Subtotal 0.416 0.538 12.396 13.870 Other Cost Elements 14.427 17.399 Other Cost Elements Subtotal Miscellaneous HM&E 14.427 17.399 Total Hull, Mechanical, and Electrical (HM&E) 26.823 31.269 Remarks: Government Furnished Equipment (GFE) increases associated with Hull, Mechanical & Electronical (HM&E) are driven by renegotiations associated with new contract awards and above normal inflation driven by vendor material increases LPD 34: Motor Operated Pilot Valve (MOPV) is a shipbuilder requirement included in Basic. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 8 of 19 P-1 Line #18 Volume 1 - 280 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Ordnance Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items RAM Block II 2 19.956 2 19.182 MK 38 Gun 2 9.778 2 15.653 AN/SPQ-9B Radar Set 1 11.582 1 11.545 EASR 1 48.340 1 52.913 P-35 Items Subtotal 89.656 99.293 Major Items ASGSI/HOSS/MWS Fit Control & Inst Land Sys 1 3.808 1 4.873 Ordnance Handling Equipment 1 0.496 1 0.761 Next Generation Surface Search Radar (NGSSR) 1 3.228 1 Major Items Subtotal 5.955 7.532 11.589 Other Cost Elements Miscellaneous Ordnance 28.533 33.127 Other Cost Elements Subtotal 28.533 33.127 Total Ordnance 125.721 144.009 Remarks: Government Furnished Equipment (GFE) increases associated with Ordnance are driven by renegotiations associated with new contract awards and above normal inflation driven by vendor material increases LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 9 of 19 P-1 Line #18 Volume 1 - 281 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Mission Systems PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 55.983 Other Costs Total Cost (Each) ($ M) 1 72.149 1 75.747 2.288 Total 1 3.598 58.271 Description: Description: Mission Systems is a microcomputer-based integration of shipboard control electronics; Engineering Control System (ECS), Ship Control System (SCS), Hull Mechanical & Electrical (HM&E) Network, Navigation Network. Mission systems and associated integration will be provided by Government supplied material and services Contract Data: Quantity Unit Cost Various 1 45.983 Various 1 98.715 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Various Various Various FY 2027 LPD FLT II 34 Various Various TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 37 24 Nov 2027 FY 2027 LPD FLT II 34 Oct 2034 37 Various Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 10 of 19 P-1 Line #18 Volume 1 - 282 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: C4ISR PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 56.591 ($ M) 1 78.444 Spares 2.118 1.433 Technical Engineering Services 7.592 10.331 Ancillary Equipment 0.276 - Documentation and Systems Engineering 5.649 5.988 Other Appropriate Costs 10.706 - Turnkey 16.865 18.043 Total 1 99.797 1 114.239 Description: C4ISR systems provide the link between the ship, the command hierarchy, and other units of the operating forces. The capability is provided by a turn-key Radio Communication System (line-of sight, beyond line of sight, and satellite communications (SATCOM)), Consolidated Afloat Networks and Enterprise Services (CANES), GPS-Based Positioning, Navigation and Timing Service (GPNTS), and associated Advanced Individual Training (AIT) and IT System Operational Verification Testing (SOVT) services support provided at the shipbuilding location. Contract Data: Quantity Unit Cost Various 1 56.591 Various 1 78.444 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Various Various Various FY 2027 LPD FLT II 34 Various Various TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 16 16 Apr 2030 FY 2027 LPD FLT II 34 Oct 2034 16 Various Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 11 of 19 P-1 Line #18 Volume 1 - 283 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Ship Self Defense System (SSDS) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 16.849 1 21.696 Spares 1.552 0.474 Technical Engineering Services 0.634 0.785 Other Costs 3.105 4.251 Documentation and Systems Engineering 2.950 Total 1 3.670 25.090 1 30.876 Description: Ship Self Defense System Mark 6 Mod X is microcomputer-based, self-defense coordination system that integrates and automates multiple sensors, self-defense weapons, and softkill systems to provide quick reaction combat capability against anti-ship cruise missile threats. Contract Data: Quantity Unit Cost New 1 16.849 New 1 21.696 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 TBD TBD TBD FY 2027 LPD FLT II 34 TBD TBD TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 17 13 Jun 2030 FY 2027 LPD FLT II 34 Oct 2034 17 13 Apr 2032 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 12 of 19 P-1 Line #18 Volume 1 - 284 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Cooperative Engagement Capability (CEC) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 9.192 ($ M) 1 13.902 Technical Engineering Services 0.489 0.540 Documentation and Systems Engineering 0.560 1.031 Other Costs 1.959 Total 1 2.434 12.200 1 17.907 Description: Cooperative Engagement Capability (CEC) coordinates all anti-warfare sensors into single, real time, fire control quality composite track which improves battle force air defense. Contract Data: Quantity Unit Cost Various 1 9.192 Various 1 13.902 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Raytheon SS/FFP Various FY 2027 LPD FLT II 34 Raytheon SS/FFP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 24 18 Jun 2029 FY 2027 LPD FLT II 34 Oct 2034 24 18 Apr 2031 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 13 of 19 P-1 Line #18 Volume 1 - 285 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Interrogator System IFF (Identification Friend or Foe) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.881 1 6.874 Spares 0.164 0.232 Technical Engineering Services 0.131 0.172 Other Costs 0.306 0.503 Documentation and Systems Engineering 0.167 Total 1 0.059 6.649 1 7.840 Description: The transponder set is an Automatic Identification and Monitoring System (AIMS) Identification Friend or Foe (IFF) system that receives interrogation signals from air, surface, and land IFF - equipped units and automatically replies with a coded response signal providing ownship position and identification. Contract Data: Quantity Unit Cost New 1 5.881 New 1 6.874 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 BAE C/FP Jun 2025 FY 2027 LPD FLT II 34 BAE C/FP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 6 30 Dec 2029 FY 2027 LPD FLT II 34 Oct 2034 6 30 Oct 2031 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 14 of 19 P-1 Line #18 Volume 1 - 286 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 12.105 ($ M) 1 14.766 Spares 0.429 0.335 Technical Engineering Services 0.160 0.378 Other Costs 0.720 0.790 Documentation and Systems Engineering 0.944 Total 1 1.160 14.358 1 17.429 Description: The AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) is a shipboard system that provides a full suite of Electronic Warfare capabilities designed to protect against anti-cruise ship missile threats. Contract Data: Quantity Unit Cost Various 1 12.105 Various 1 14.766 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Lockheed C/FFP Sep 2025 FY 2027 LPD FLT II 34 Lockheed C/FFP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 24 24 Dec 2028 FY 2027 LPD FLT II 34 Oct 2034 24 24 Oct 2030 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 15 of 19 P-1 Line #18 Volume 1 - 287 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: RAM Block II PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) ($ M) 16.940 2 16.098 Spares 0.151 0.894 Technical Engineering Services 0.353 0.732 Other Costs 1.195 0.746 Documentation and Systems Engineering 1.317 Total 2 0.712 19.956 2 19.182 Description: The Rolling Airframe Missile (RAM) Block 2 system is a short-range, fast-reaction, high-firepower, lightweight weapon designed to destroy incoming anti-ship cruise missiles. Contract Data: Quantity Unit Cost Option 2 8.470 Option 2 8.049 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Raytheon C/FFP TBD FY 2027 LPD FLT II 34 Raytheon C/FFP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 27 24 Sep 2028 FY 2027 LPD FLT II 34 Oct 2034 27 24 Jul 2030 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 16 of 19 P-1 Line #18 Volume 1 - 288 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: MK 38 Gun PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) ($ M) 9.520 Technical Engineering Services 2 14.365 0.258 Other Costs 0.115 - Total 2 1.173 9.778 2 15.653 Description: The MK-38 Gun is a single barrel, lightweight, remote controlled, automatic and stabilized 30mm machine gun system with day and night sensors and eye-safe laser range finder to provide automatic target detection, tracking and engagement. Contract Data: Quantity Unit Cost New 2 4.760 New 2 7.183 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 General Dynamics Land Systems C/FFP TBD FY 2027 LPD FLT II 34 General Dynamics Land Systems C/FFP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 24 18 Jun 2029 FY 2027 LPD FLT II 34 Oct 2034 24 18 Apr 2031 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 17 of 19 P-1 Line #18 Volume 1 - 289 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SPQ-9B Radar Set PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 9.015 1 9.074 Spares 0.455 0.446 Technical Engineering Services 0.829 0.777 Other Costs 0.697 0.802 Documentation and Systems Engineering 0.586 Total 1 0.446 11.582 1 11.545 Description: The AN/SPQ-9B Radar detects and tracks low flying Anti-Ship Missile targets in heavy clutter. The mission of the AN/SPQ-9B includes the capability to detect and classify periscopes with the completion and incorporation of a Periscope Detection and Discrimination (PDD) capability designed to operate concurrently with the AN/SPY-6 capability. Contract Data: Quantity Unit Cost New 1 9.015 New 1 9.074 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 DRS C/FFP Mar 2025 FY 2027 LPD FLT II 34 DRS C/FFP TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 24 24 Dec 2028 FY 2027 LPD FLT II 34 Oct 2034 24 24 Oct 2030 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 18 of 19 P-1 Line #18 Volume 1 - 290 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: EASR PARM Code: N/A FY 2025 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 32.215 1 29.184 Spares 1.279 Technical Engineering Services 5.815 9.952 Other Costs 7.533 10.269 Documentation and Systems Engineering 0.904 1.498 Total 1 2.604 48.340 1 52.913 Description: The AN/SPY-6(V)2 Enterprise Air Surveillance Radar (EASR) is the Air Search Radar. Contract Data: Quantity Unit Cost New 1 32.215 New 1 29.184 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2025 LPD FLT II 33 Raytheon C/FPIF Jun 2024 FY 2027 LPD FLT II 34 Raytheon C/FPIF TBD (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2025 LPD FLT II 33 Dec 2032 18 27 Mar 2029 FY 2027 LPD FLT II 34 Oct 2034 18 27 Jan 2031 Competition/Second Source Initiatives: N/A LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 19 of 19 P-1 Line #18 Volume 1 - 291 === page 342 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 292 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 First System (2027) Award Date: March 2023 First System (2027) Completion Date: February 2029 Cost Elements Interval Between Systems: 0 Months Production Leadtime When Required* - - (Months) (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) LPD 36 Advance Procurement Basic Construction Total: LPD 36 Advance Procurement - - 0.000 - - 300.000 - - - - - - 300.000 - - - 355.950 - - - - - - 355.950 - - - - LPD 37 Advance Procurement Basic Construction - Various Total: LPD 37 Advance Procurement LPD 38 Advance Procurement Basic Construction - - 0.000 - 373.748 - - Total: LPD 38 Advance Procurement - - - - - - 373.748 - - Total Advance Procurement/Obligation Authority - - - 373.748 355.950 300.000 - *Note: "When Required" is the number of months required before ship delivery. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 1 of 2 P-1 Line #19 Volume 1 - 293 === page 344 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 3010 / LPD Flight II Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) LPD 36 Advance Procurement Basic Construction - - - - 0.000 Total: LPD 36 Advance Procurement - LPD 37 Advance Procurement Basic Construction - Various - Mar 2027 - 2028 355.950 Total: LPD 37 Advance Procurement 355.950 LPD 38 Advance Procurement Basic Construction - - - - 0.000 Total: LPD 38 Advance Procurement - Total Advance Procurement/Obligation Authority 355.950 Description: Advance Procurement funding will be used to purchase Long Lead Time Material (LLTM) and to maintain schedule. LLTM procurements will include, but are not limited to: Engines, Diesel Generators, Reduction Gears, Motor Controllers, Propellers, Shafting, Elevators, A/C Plants, Switchboards/Power Panels, and Government Furnished Equipment. The FY 2026 Total for Advance Procurement does not show $339,000 thousand of advance procurement funds for LPD 34 and $288,912 thousand of advance procurement funds for LPD 35 in FY 2026 mandatory funding. Total FY 2026 mandatory funding for LPD Advance Procurement is $627,912 thousand. *Note: "When Required" is the number of months required before ship delivery. LI 3010 - LPD Flight II Navy UNCLASSIFIED Page 2 of 2 P-1 Line #19 Volume 1 - 294 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3039 / Expeditionary Sea Base (ESB) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) 8 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 8 Total Gross/Weapon System Cost ($ in Millions) 4,914.911 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 4,914.911 Less PY Advance Procurement ($ in Millions) 252.700 - - - - - - - - - - 252.700 Less Cost To Complete ($ in Millions) 80.100 - - - - - - - - - - 80.100 162.500 - - - - - - - - - - 162.500 107.400 - - - - - - - - - - 107.400 4,312.211 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 4,312.211 162.500 - - - - - - - - - - 162.500 Less Subsequent Year Full Funding ($ in Millions) Less Section 8121 Inflation Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) 4,474.711 - - - - - - - - - - 4,474.711 Plus CY Advance Procurement ($ in Millions) 252.700 - - - - - - - - - - 252.700 Plus Cost To Complete ($ in Millions) 38.000 - 30.000 12.100 - 12.100 - - - - - 80.100 107.400 - - - - - - - - - - 107.400 4,872.811 0.000 30.000 12.100 0.000 12.100 0.000 0.000 0.000 0.000 - 4,914.911 Plus Section 8121 Inflation Funding ($ in Millions) Total Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 187.105 10.177 11.858 7.431 - 7.431 - - - - - 216.571 5,059.916 10.177 41.858 19.531 - 19.531 - - - - - 5,131.482 614.364 - - - - - - - - - - 614.364 Description: The Expeditionary Mobile Base (ESB) (formerly MLP Afloat Forward Staging Base (AFSB)) will serve as a dedicated Naval Afloat Forward Staging Base, optimized to support naval assets in a variety of missions rather than independently modifying ships-of-opportunity as required to meet these roles. The ESB retains sealift capabilities inherent to the Class through cargo transportation and distribution, but provides enhanced aviation, berthing, small boat handling, and command and control capabilities to meet a broader mission set. The ESB provides the Combatant Commanders flexibility to respond to immediate threats and host task organized forces, including Airborne Mine Countermeasures and Special Forces to confront irregular challenges and counter-terrorism. This includes enhanced logistics and underway replenishment capability (receive only) and C4I capability to support future missions. Note: 1) The amounts in the Prior Years column includes the NDSF MPF,F MLP BLI 00401 Procurement Costs for Expeditionary Transport Dock (ESD) 1, ESD 2, and ESB 3 as well as SCN BLI 3039 for the ESB 4, 5, 6, 7, and ESB 8. 2) The Outfitting and Post Delivery amounts in the Prior Years column represent NDSF BLI 5000 for ESD 1, ESD 2, and ESB 3 as well as SCN BLI 5110 for the ESB 4 and ESB 5; and ESB 6 outfitting. LI 3039 - Expeditionary Sea Base (ESB) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #20 Volume 1 - 295 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3039 / Expeditionary Sea Base (ESB) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Nominal Requirements 255M 50M 28879 TONS 9.1M ESB 8 Jul 2022 49 months 36 months Aug 2026 Nov 2026 Oct 2027 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Sep 2009 Dec 2009 Contract Design Dec 2009 Aug 2010 Detail Design Aug 2010 Nov 2011 Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Budget Quality Class LI 3039 - Expeditionary Sea Base (ESB) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #20 Volume 1 - 296 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 P-1 Line Item Number / Title: 3039 / Expeditionary Sea Base (ESB) FY 2022 Qty Cost Categories Total Cost (Each) Plan Costs ($ M) 1 Basic Construction/Conversion 677.098 Change Orders 2.000 Electronics 42.679 Hull, Mechanical, and Electrical (HM&E) 12.000 Other Cost 2.723 Total Ship Estimate 736.500 Less Advance Procurement FY 2021 73.000 Less Cost to Complete FY 2026 30.000 Less Cost to Complete FY 2027 12.100 Less Section 8121 Inflation Funding FY 2023 44.400 Net P-1 Funding 577.000 Remarks: The $12.1 million of FY27 Completion of Prior Year Shipbuilding Programs funds for ESB 8 is to finance economic price adjustments, fund the Government responsible portion of the shipbuilding contract overrun, and fund ESB close out costs. LI 3039 - Expeditionary Sea Base (ESB) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #20 Volume 1 - 297 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3039 / Expeditionary Sea Base (ESB) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date ESB 8 NASSCO 2022 Jul 2022 Aug 2023 Aug 2026 LI 3039 - Expeditionary Sea Base (ESB) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #20 Volume 1 - 298 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3041 / LHA Replacement Program Elements for Code B Items: N/A Other Related Program Elements: 0604567N Line Item MDAP/MAIS Code: 333 Resource Summary Procurement Quantity (Units in Each) Prior Years 4 FY 2025 FY 2026 - - FY 2027 Base FY 2027 OOC 1 FY 2027 Total - 1 FY 2028 FY 2029 - - To FY 2031 Complete FY 2030 1 Total - - 6 Gross/Weapon System Cost ($ in Millions) 14,558.852 0.000 0.000 4,202.537 0.000 4,202.537 0.000 0.000 5,713.299 0.000 - 24,474.688 Less PY Advance Procurement ($ in Millions) 1,498.123 - - 350.118 - 350.118 - - 850.000 - - 2,698.241 706.188 - - - - - - - - - 706.188 6,831.190 - - 2.100 - 2.100 - - - - 9,263.290 Less Prior Year Full Funding ($ in Millions) 568.637 - - - - - - - - - - 568.637 Less Hurricane ($ in Millions) 202.000 - - - - - - - - - - 202.000 4,752.714 0.000 0.000 0.000 0.000 0.000 - 11,036.332 6,831.190 - - 2.100 - 2,430.000 - 9,263.290 Plus Prior Year FF ($ in Millions) 568.637 - - - - Full Funding TOA ($ in Millions) 12,152.541 - - 2.100 - Plus CY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Subsequent Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) 1,787.123 61.118 - Plus Cost To Complete ($ in Millions) 267.088 115.397 93.603 Plus Hurricane ($ in Millions) 202.000 Total Obligation Authority ($ in Millions) 14,408.752 176.515 93.603 3,850.319 0.000 - - - - 3,850.319 - - 3,850.319 3,850.319 - 164.300 - - - 164.300 - 4,014.619 0.000 4,014.619 450.000 2,430.000 2,433.299 2,433.299 2,430.000 - 568.637 - 20,868.259 - - - 2,698.241 18.900 - 46.900 - - 706.188 - - - - - 202.000 2,430.000 - 24,474.688 471.000 400.000 - 400.000 2,480.199 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 262.839 14.169 23.119 11.586 - 11.586 64.646 25.900 26.200 47.965 - 476.424 Total ($ in Millions) 14,671.591 190.684 116.722 4,026.205 - 4,026.205 535.646 425.900 2,506.399 2,477.965 - 24,951.112 Gross/Weapon System Unit Cost ($ in Millions) 3,639.713 4,202.537 - 4,202.537 - 4,079.115 - - - - 5,713.299 - Description: The LHA(R) Program replaces the Tarawa Class (LHA 1) Amphibious Assault Class Ships and the retiring Wasp Class (LHD 1) Amphibious Assault Class Ships. The LHA(R) Class Program ensures that the Amphibious Fleet remains capable of Expeditionary Warfare well into the 21st Century and provides for an affordable and sustainable Amphibious Ship development program. The LHA(R) Class provides forward presence and power projection as an integral part of joint, interagency, and multinational maritime Expeditionary forces. The LHA(R) Class operates for sustained periods in transit to and operations in an Amphibious Objective Area to include the embarkation, deployment, and landing of a Marine Landing Force and supporting forces by helicopters and tilt rotors supported by Joint Strike Fighters (JSF) F-35B. LHA(R) Flight 0 is considered a transitional increment intended to increase the aviation capabilities of Amphibious Assault Class Ships. LHA(R) Flight 0 consisted of two ships - LHA 6 and LHA 7. LHA(R) Flight 1 is the second increment in the LHA 6 Class, with LHA 8 (FY 2017) being the first ship of Flight 1. The LHA(R) Flight 1 design continues the incremental development of Amphibious Assault Class Ships by adding a well deck and increasing the flight deck capacity by reducing the footprint of the island and adding a sponson. The Flight 1 ships maintain an aviation centric capability with the addition of a well deck that will accommodate two Landing Craft, Air Cushion (LCAC) vehicles. LHA 9 (FY 2023) is the second LHA(R) Flight 1 ship and assumes a LHA 8 baseline design. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 1 of 32 P-1 Line #21 Volume 1 - 299 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604567N Line Item MDAP/MAIS Code: 333 The Navy has awarded a Multi-Ship Procurement (MSP) contract in September 2024 for LHA 10 and LPD 33, 34, and 35. In total, the 4-ship agreement was awarded simultaneously for LHA 10 and LPD 33-35 and included Advanced Procurement (AP) to acquire Long Lead Time Material (LLTM) and Full Funding. The FY 2027 request for LHA includes $3,850,319 thousand and quantity of 1 of discretionary and $2,000 thousand and quantity of 0 of mandatory for a total of $3,852,319 thousand and a quantity of 1. The $2,000 thousand of the mandatory funds will be used to enhance the U.S surface maritime industrial base productivity specifically for firefighting improvements. The FY 2027 funds are different from the FY 2026 mandatory funds that were not provided for industrial base support. The FY 2026 spend plan amount for LHA includes $93,603 thousand and quantity of 0 of discretionary and $589,963 thousand and quantity of 0 of mandatory for a total of $683,566 thousand and a quantity of 0. The FY 2027 - FY 2031 request supports the congressionally mandated minimum of 31 Amphibious Warfare Ships and begins a demand signal for reduced time between ship procurements and alternative sources to achieve a 3.0 Amphibious Ready Group / Marine Expeditionary Unit (ARG/MEU) presence. Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date LI 3041 - LHA Replacement Navy LHA 7 LHA 8 844ft 106ft 45,594 tons 29ft 1in 844ft 106ft 43,000 tons 27ft 8in LHA 8 (1) Jun 2017 121 months 105 months Jul 2027 Sep 2028 Aug 2029 Systems: Electronics -Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C4ISR) -MK 2 MOD 4E Ship Self Defense System (SSDS) -AN/SLQ-32(V), Surface Warfare Improvement Program (SEWIP) -AN/SPN-50 -Joint Precision Approach and Landing System (JPALS) (AN/USN-3(V)1, SSLS) -Integrated Voice Network (IVN) -AN/UPX-29(V), Identification Friend or Foe (IFF) MK12 -Aircraft Control Approach Central / SPN-35C -Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA) AN/SRC-55 -Ring Laser Gyro Navigator (RLGN) AN/WSN-12 -Amphibious Air Traffic Control Direct Altitude and Identity Readout (AATC-DAIR) / SYY-1 LHA 9 (2) Oct 2022 105 months 103 months Jul 2031 Sep 2032 Aug 2033 LHA 10 Ordnance -Enterprise Air Surveillance Radar (EASR) -NATO Sea Sparrow Missile System (NSSMS) MK 57 Mod 14 -MK31 Mod 3, Rolling Airframe Missile (RAM) (Tech Refresh) -PHALANX Block 1B MK15 Mod 21 & 22, Close-in Weapon System (CIWS) -AN/SPQ-9B Radar Set -Vertical/Stationary Take-Off Landing Optical Landing System (VSTOL OLS) (3) Sep 2024 120 months 79 months Sep 2034 Dec 2035 Nov 2036 UNCLASSIFIED Page 2 of 32 P-1 Line #21 Volume 1 - 300 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3041 / LHA Replacement Program Elements for Code B Items: N/A Other Related Program Elements: 0604567N Line Item MDAP/MAIS Code: 333 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Nov 2011 Mar 2013 Contract Design Mar 2013 Sep 2014 Detail Design Jun 2017 Mar 2019 Request for Proposals Jun 2015 Dec 2015 Design Agent Huntington Ingalls Inc. Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C Footnotes: (1) (2) (3) LHA 8: Delivery Date revised from August 2026 to July 2027 based on construction performance indicators and shipyard labor challenges. LHA 9: Delivery Date revised from September 2030 to July 2031 based on the shipyard's formal Over Target Schedule (OTS) re-baselining effort due to shipyard labor challenges. LHA 10: Delivery Date revised from September 2033 to September 2034 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 3 of 32 P-1 Line #21 Volume 1 - 301 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs Ordnance (Each) (†) (†) Other Cost Total Ship Estimate Qty ($ M) 329.093 (†) FY 2027 Total Cost (Each) 3,119.710 Change Orders Hull, Mechanical, and Electrical (HM&E) FY 2023 Total Cost 1 Basic Construction/Conversion Electronics FY 2017 Qty Qty ($ M) 1 Total Cost (Each) 125.000 ($ M) 1 - 3,050.900 3,273.172 132.390 70.183 108.700 323.554 335.010 452.963 63.183 61.882 73.000 158.708 168.742 204.223 95.178 69.439 90.479 4,221.816 3,881.156 4,202.537 Less Advance Procurement FY 2015 29.093 - - Less Advance Procurement FY 2016 476.038 - - Less Advance Procurement FY 2019 - Less Advance Procurement FY 2023 - - 289.000 - - 61.118 - - Less Advance Procurement FY 2025 Less Subsequent Full Funding FY 2018 350.000 1,706.692 - Less Subsequent Full Funding FY 2024 - Less Subsequent Full Funding FY 2028 - - 2.100 Less Cost to Complete FY 2023 19.300 - - Less Cost to Complete FY 2025 115.397 - - Less Cost to Complete FY 2026 93.603 - - Less Cost to Complete FY 2027 164.300 - - Less Cost to Complete FY 2028 18.900 - - Less Cost to Complete FY 2030 - 46.900 - Less Prior Year Full Funding FY 2021 - 500.000 - Less Prior Year Full Funding FY 2022 - 68.637 Net P-1 Funding 1,598.493 1,830.149 1,085.470 - 3,850.319 Remarks: FY 2017 (LHA 8): The Department added additional CTC funding from the FY 2026 budget in FY 2027 for the Government responsible portion of the LHA 8 shipbuilding construction contract overrun ($121.6M), expected Economic Price Adjustment (EPA) liability increase for LHA 8 ($12.4M), and LHA 8 deferred work changes ($20M). FY 2027 (LHA 10): $2.1M for 8010 Shipbuilding Firefighting Instruction Implementation is programmed in FY 2028 and shown as Subsequent Year Full Funding for the LHA 10. FY 2027 (LHA 10): The FY 2027 Total Ship Estimate does not show $589,963 thousand of advance procurement funded in FY 2026 mandatory funding. Total ship estimate for FY 2027 is $4,792,500 thousand. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 4 of 32 P-1 Line #21 Volume 1 - 302 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LHA 8 (1) HII 2017 Jun 2017 Oct 2018 Jul 2027 LHA 9 (2) HII 2023 Oct 2022 Dec 2022 Jul 2031 LHA 10 (3) HII 2027 Sep 2024 Feb 2028 Sep 2034 LHA 11 (4) HII 2030 Sep 2030 Dec 2030 Sep 2038 Footnotes: (1) (2) (3) (4) LHA 8: Delivery Date revised from August 2026 to July 2027 based on construction performance indicators and shipyard labor challenges. LHA 9: Delivery Date revised from September 2030 to July 2031 based on the shipyard's formal Over Target Schedule (OTS) re-baselining effort due to shipyard labor challenges. LHA 10: Delivery Date revised from September 2033 to September 2034 based on the shipyard's formal OTS re-baselining effort due to shipyard labor challenges. LHA 11: Contract Award Date is notional. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 5 of 32 P-1 Line #21 Volume 1 - 303 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2023 Electronics Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C4ISR) 1 169.701 1 240.719 MK 2 MOD 4E Ship Self Defense System (SSDS) 1 35.308 1 28.797 AN/SLQ-32(V), Surface Warfare Improvement Program (SEWIP) 1 14.904 1 18.893 AN/SPN-50 1 16.643 1 15.061 Joint Precision Approach and Landing System (JPALS) (AN/USN-3(V)1, SSLS) 1 6.885 1 13.831 AN/USG-2, Cooperative Engagement Transmission Processing Set (CETPS) 1 7.380 1 13.620 AN/SLQ-25E, Torpedo Countermeasures Transmitting Set (NIXIE) 2 5.993 2 12.238 Integrated Voice Network (IVN) 1 10.218 1 10.856 Next Generation Surface Search Radar (NGSSR) / SPS-73 2 1.232 2 10.084 USQ-82, Gigabit Ethernet Data Multiplex System (GEDMS) 1 6.851 1 9.490 AN/UPX-29(V), Identification Friend or Foe (IFF) MK12 1 7.802 1 8.446 Aircraft Control Approach Central / SPN-35C 1 6.273 1 7.017 Electronic Fueling at Sea (EFAS) 0 - 1 6.827 Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA) AN/SRC-55 1 6.025 1 6.549 Ring Laser Gyro Navigator (RLGN) AN/WSN-12 1 5.516 1 6.483 Amphibious Air Traffic Control Direct Altitude and Identity Readout (AATC-DAIR) / SYY-1 1 5.333 1 4.987 Aircraft Approach Control Transmitting Set (AACTS) AN/SPN-41B 1 4.617 0 P-35 Items Subtotal 310.681 413.898 Major Items UXQ-22 (Circuit 28-31TV) 1 1.326 4 5.617 Announcing Systems AN/SIA-127H 1 2.656 1 2.925 SATCC 1 2.106 1 2.702 Electronic Chart Display Information System (ECDIS) Navigation Displays 1 Advanced Damage Control System (ADCS) 2.113 2.407 1 - 2.344 1.553 Amphibious Assault Direction System (AADS) 1 1.448 1 1.488 MK 53 NULKA Decoy Launching System (DLS) Mod 3 1 1.264 1 1.380 AN/USQ-T46(V), Battle Force Tactical Training (BFTT) 1 1.103 1 1.305 Tactical Air Navigation (TACAN) - 0.984 Digital Photo Lab 1 0.623 1 Print Shop 1 0.566 1 Major Items Subtotal LI 3041 - LHA Replacement Navy 13.205 UNCLASSIFIED Page 6 of 32 P-1 Line #21 22.705 Volume 1 - 304 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2023 Electronics Qty (Each) FY 2027 Total Cost Qty ($ M) (Each) Total Cost ($ M) Other Cost Elements Miscellaneous Electronics 11.124 Other Cost Elements Subtotal 11.124 16.360 16.360 Total Electronics 335.010 452.963 Remarks: AN/USG-2, Cooperative Engagement Transmission Processing Set (CETPS) and USQ-8, Gigabit Ethernet Data Multiplex System (GEDEMS) moved from Major Items to P-35 Items since the FY26 Budget. Major Item 30 TV renamed to UXQ-22 (Circuit 28-31 TV) since the FY26 Budget. For LHA(R) Flight 1 ships: The Enterprise Air Surveillance Radar (EASR) suite will be a modern, long-range, three-dimensional (3-D) radar used to search, detect and provide space-stabilized, three-coordinate (range, bearing, height) data for air intercept control and designation to a weapon system and Air Traffic Control (ATC) system. The LHA(R) Flight 1 configuration includes a rotating antenna array, below decks radar and cooling equipment. The EASR suite replaces the SPS 48/49 air-search radar systems. AN/SPS-48 air search radars have not been in production for several years. All existing AN/SPS-48 radars are installed on operational Fleet ships. Without the EASR suite, LHA(R) Flight 1 ships will not have an air-search radar for self-defense and airspace deconfliction. The AN/SPN-50 Shipboard Air Traffic Radar (SATR) system provides aircraft position, radar signal and radar data. Air traffic controllers use the data for aircraft sequencing and separation, airspace identification and containment, safety alerts, traffic advisories and landing guidance. AN/SPN-50 SATR replaces the AN/SPN 43C SATR. EASR and AN/SPN-50 are designed to be integrated systems whereas EASR and AN/ SPN 43C are not as compatible. The dual mast antenna configuration Cooperative Engagement Transmission Processing Set (CETPS) replaces the single mast CETPS. The CETPS dual mast antenna configuration improves the compatibility with AN/SPN-50 and allows the ship to maintain 360-degree data link coverage and full combat systems capability. FY 2027 (LHA 10) Electronics: - C4ISR increase primarily due to Consolidated Afloat Networks and Enterprise Services (CANES) new variant - SSDS decrease between LHA 9 and LHA 10 reflects decreased costs associated with Mod X systems T&E - JPALS increase compared to LHA 9, as LHA 9 utilized previously procured hardware - CETPS increase due to increased hardware and T&E costs associated with new Integrated Combat System (ICS) requirements - SLQ-25E / NIXIE increase due to new contract award negotiation - SPS-73/NGSSR increase due to new contract, new Dual Configuration Radar requirement, and the need for additional INCO spares based on recent failure data - EFAS new system for LHA 10 - UXQ-22 (Circuit 28-31TV) increase due to the inclusion of all four Circuit TVs 28-31 - SPN-41B removed from the LHA 10 baseline - Digital Photo Lab and Print Shop no longer Major Items for LHA 10; included under Miscellaneous Electronics LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 7 of 32 P-1 Line #21 Volume 1 - 305 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2023 Hull, Mechanical, and Electrical (HM&E) Qty (Each) FY 2027 Total Cost Qty ($ M) (Each) Total Cost ($ M) Major Items Equipment & Engineering 47.605 SUPSHIP Material/Services 4.813 5.678 Test & Instrumentation 9.464 11.164 Major Items Subtotal 61.882 73.000 Total Hull, Mechanical, and Electrical (HM&E) 61.882 73.000 LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 8 of 32 P-1 Line #21 56.158 Volume 1 - 306 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2023 Ordnance Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Enterprise Air Surveillance Radar (EASR) 1 38.262 1 51.493 NATO Sea Sparrow Missile System (NSSMS) MK 57 Mod 14 1 34.125 1 43.563 MK31 Mod 3, Rolling Airframe Missile (RAM) (Tech Refresh) 2 22.290 2 24.842 PHALANX Block 1B MK15 Mod 21 & 22, Close-in Weapon System (CIWS) 1 18.458 1 23.575 AN/SPQ-9B Radar Set 1 7.628 1 11.240 Vertical/Stationary Take-Off Landing Optical Landing System (VSTOL OLS) 1 15.265 1 P-35 Items Subtotal 136.028 9.053 163.766 Major Items MK 38 Mod 2 Stabilized Gun Stand Assembly 3 7.143 3 4.369 AN/SPA-25J 4 0.947 4 3.681 MORIAH 1 2.395 1 Major Items Subtotal 10.485 2.671 10.721 Other Cost Elements Aviation Support 8.202 8.371 Miscellaneous Ordnance 2.964 10.191 11.174 Total Ship Test Program 11.063 Other Cost Elements Subtotal 22.229 29.736 Total Ordnance 168.742 204.223 Remarks: FY 2027 (LHA 10) Ordnance: - Ordnance system increases are driven by renegotiations associated with new contract awards - LHA 10 VSTOL decrease reflects costs savings expected from refurbished Indicator Boxes LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 9 of 32 P-1 Line #21 Volume 1 - 307 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C4ISR) PARM Code: PEO C4I FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) Total Cost (Each) 1 93.910 ($ M) 1 153.360 Technical Data and Documentation 1.607 Spares 5.070 6.976 System Engineering 15.493 18.403 Technical Engineering Services 28.925 30.618 Other Costs 24.696 Total 1 0.910 30.452 169.701 1 240.719 Description: The Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C4ISR) system is used to prove the link between the ship, the command hierarchy, and other units of the operating forces. Contract Data: Quantity Unit Cost Various 1 93.910 Various 1 153.360 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Various Various Various FY 2027 LHA 10 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 0 0 Required Award Date Jul 2031 FY 2027 LHA 10 Sep 2034 0 0 Sep 2034 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 10 of 32 P-1 Line #21 Volume 1 - 308 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: MK 2 MOD 4E Ship Self Defense System (SSDS) PARM Code: PEO IWS1A5 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 21.824 1 17.800 Technical Data and Documentation 0.689 0.562 Spares 1.434 1.170 System Engineering 2.026 1.652 Technical Engineering Services 1.229 1.002 Other Costs 8.106 Total 1 6.611 35.308 1 28.797 Description: The Ship Self Defense System (SSDS) MK 2, Mod (x) Common C2 system provides capabilities for multi-mission requirements including Ship Protection against air, surface, and subsurface threats using both own-ship and remote data (Joint Composite Track Number (JCTN) and Joint Data Network (JDN)) in support of the Anti-Air Warfare (AAW) Capstone requirements. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Leonardo DRS C/CPFF May 2023 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 21.824 1 17.800 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 32 24 Nov 2026 FY 2027 LHA 10 Sep 2034 32 24 Jan 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 11 of 32 P-1 Line #21 Volume 1 - 309 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SLQ-32(V), Surface Warfare Improvement Program (SEWIP) PARM Code: PEO IWS2E FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 12.607 1 16.245 Technical Data and Documentation 0.056 0.061 Spares 0.286 0.376 System Engineering 1.087 1.075 Technical Engineering Services 0.170 0.363 Other Costs 0.698 Total 1 0.773 14.904 1 18.893 Description: SEWIP Block 2 is a scalable Electronic Warfare enterprise suite to provide improved Electromagnetic Interference (EMI) mitigation and Combat System Interface capabilities to select new construction ships as well as upgrade current AN/SLQ-32(V)3 and (V)4 Electronic Warfare (EW) suites on existing ships. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning and protection from anti-ship missiles. SEWIP Block 2 focused on Electronic Support (ES) capability improvements. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Lockheed Martin Corporation, RMS C/FFP Jun 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 12.607 1 16.245 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 24 23 Aug 2027 FY 2027 LHA 10 Sep 2034 24 23 Oct 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 12 of 32 P-1 Line #21 Volume 1 - 310 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SPN-50 PARM Code: NAVAIR PMA213 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 13.528 1 12.242 Technical Data and Documentation 0.053 0.048 Spares 1.119 1.013 System Engineering 0.781 0.707 Technical Engineering Services 0.564 0.510 Other Costs 0.598 Total 1 0.541 16.643 1 15.061 Description: AN/SPN-50 Shipboard Air Traffic Radar (SATR) system provides aircraft position, radar signal and radar data. Air traffic controllers use the data for aircraft sequencing and separation, airspace identification and containment, safety alerts, traffic advisories and landing guidance. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 SAAB C/FFP Aug 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 13.528 1 12.242 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 29 18 Aug 2027 FY 2027 LHA 10 Sep 2034 29 18 Oct 2030 Competition/Second Source Initiatives: N/A Remarks: AN/SPN-50 SATR system replaces the AN/SPN 43C SATR. EASR and AN/SPN-50 are designed to be integrated systems whereas EASR and AN/SPN 43C are not as compatible. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 13 of 32 P-1 Line #21 Volume 1 - 311 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Joint Precision Approach and Landing System (JPALS) (AN/USN-3(V)1, SSLS) PARM Code: NAVAIR PMA213 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.728 1 11.601 Spares 0.480 0.138 System Engineering 0.821 0.499 Technical Engineering Services 1.251 1.151 Other Costs 0.605 Total 1 0.442 6.885 1 13.831 Description: The Joint Precision Approach and Landing System (JPALS) is the primary precision approach and landing system for CVN and LHA/D ships to support aircraft without SPN-46 Automatic Carrier Landing Systems (ACLS) capability, which include F-35B, F-35C, MQ-25 and future platforms. The nomenclature for JPALS has been designated AN/USN-3(V)1, Satellite Signals Landing System. JPALS ship systems are required to provide CVN and LHA/D ships a primary precision approach capability during night and instrument flight conditions, including coupled approach capability to a hover transition point for LHA/D ships and coupled approach to the deck (auto-land) capability aboard CVN ships. JPALS also provides over-the-air inertial alignment capability for CVN and LHA/D ships to support aircraft platforms without Link-4A capability, including F-35, MQ-25 and future platforms. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Raytheon C/FPIF Sep 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 3.728 1 11.601 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 38 12 May 2027 FY 2027 LHA 10 Sep 2034 38 12 Jul 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 14 of 32 P-1 Line #21 Volume 1 - 312 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/USG-2, Cooperative Engagement Transmission Processing Set (CETPS) PARM Code: N/A FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.163 1 9.528 Technical Data and Documentation 0.136 0.251 Spares 0.459 0.846 System Engineering 0.283 0.523 Technical Engineering Services 0.296 0.546 Other Costs 1.043 Total 1 1.926 7.380 1 13.620 Description: N/A Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Raytheon C/FFP Jul 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 5.163 1 9.528 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 18 18 Required Award Date Jul 2028 FY 2027 LHA 10 Sep 2034 18 18 Sep 2031 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 15 of 32 P-1 Line #21 Volume 1 - 313 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SLQ-25E, Torpedo Countermeasures Transmitting Set (NIXIE) PARM Code: PMS 415 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) ($ M) 4.518 2 9.223 Technical Data and Documentation 0.099 0.203 Spares 0.073 0.150 System Engineering 0.273 0.558 Technical Engineering Services 0.266 0.544 Other Costs 0.764 Total 2 1.560 5.993 2 12.238 Description: The AN/SLQ-25 (NIXIE) is a towed torpedo countermeasure system used on Naval warships to defend against wake-homing, acoustic-homing, and wire-guided torpedoes. It is designed as a decoy to lure an incoming torpedo away from the ship by mimicking the ship's acoustic signature, effectively presenting a more attractive target. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Ultra Electronic Ocean Systems C/CPFF Dec 2020 New FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 2 2.259 2 4.612 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 0 20 Nov 2029 FY 2027 LHA 10 Sep 2034 0 20 Jan 2033 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 16 of 32 P-1 Line #21 Volume 1 - 314 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Integrated Voice Network (IVN) PARM Code: SEA05H FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 6.772 1 7.035 Technical Data and Documentation 0.125 0.150 System Engineering 0.876 1.070 Technical Engineering Services 1.571 1.645 Other Costs 0.874 0.906 Spares - Total 1 0.050 10.218 1 10.856 Description: The Integrated Voice Communications Network (IVCN) is an overarching engineering approach to establish consistent engineering practices and integrated voice communication capabilities across the Fleet. IVN is a fully integrated, supportable communication voice solution. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Avaya Federal Solutions, Inc. C/FFP Jul 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 6.772 1 7.035 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 48 6 Required Award Date Jan 2027 FY 2027 LHA 10 Sep 2034 48 6 Mar 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 17 of 32 P-1 Line #21 Volume 1 - 315 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Next Generation Surface Search Radar (NGSSR) / SPS-73 PARM Code: PEO IWS FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) ($ M) 1.042 2 8.525 Technical Data and Documentation 0.016 0.134 Spares 0.062 0.510 System Engineering 0.023 0.192 Technical Engineering Services 0.032 0.258 Other Costs 0.057 Total 2 0.465 1.232 2 10.084 Description: The AN/SPS-73(V)18 (NGSSR) is LHA's primary Navigation and Surface Search Radar, providing high-resolution radar imagery to ensure safe transit, especially in crowded or littoral waters. Additionally, it can detect and tracking surface contacts to maintain situational awareness, including the ability to identify and discriminate submarine periscopes and low-flying air threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Ultra Maritime Various Sep 2021 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 2 0.521 2 4.263 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 0 21 Required Award Date Oct 2029 FY 2027 LHA 10 Sep 2034 0 21 Dec 2032 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 18 of 32 P-1 Line #21 Volume 1 - 316 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: USQ-82, Gigabit Ethernet Data Multiplex System (GEDMS) PARM Code: N/A FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.500 1 4.848 Technical Data and Documentation 0.272 0.377 Spares 0.577 0.800 System Engineering 0.667 0.924 Technical Engineering Services 0.471 0.653 Other Costs 1.364 Total 1 1.888 6.851 1 9.490 Description: N/A Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 DRS Leonardo C/FFP Apr 2023 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 3.500 1 4.848 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 18 18 Required Award Date Jul 2028 FY 2027 LHA 10 Sep 2034 18 18 Sep 2031 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 19 of 32 P-1 Line #21 Volume 1 - 317 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/UPX-29(V), Identification Friend or Foe (IFF) MK12 PARM Code: NAVAIR PMA213 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 6.143 Technical Data and Documentation Total Cost (Each) ($ M) 1 5.888 - 0.015 Spares 0.747 1.531 System Engineering 0.074 0.105 Technical Engineering Services 0.252 0.329 Other Costs 0.586 Total 1 0.578 7.802 1 8.446 Description: Identification Friend or Foe (IFF) is an approved and fully supported centralized Mark XII Interrogator system. It uses one receiver transmitter that synchronizes video with up to four radar sweeps. It supplies synthetic video (symbology) to, and accepts requests from, as many as 22 remote locations. It provides digital target reporting to the combat systems/weapon systems computer via full scan, sectored, and/or pop-up interrogations. It provides instantaneous target reporting at requested range and azimuth through the use of an electronically-steered Antenna Group OE-120/UPX or OE-120A/UPX. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Various Various Various Various FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 6.143 1 5.888 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 29 24 Feb 2027 FY 2027 LHA 10 Sep 2034 29 24 Apr 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 20 of 32 P-1 Line #21 Volume 1 - 318 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Aircraft Control Approach Central / SPN-35C PARM Code: NAVAIR PMA213 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.295 1 5.392 System Engineering 0.581 0.603 Technical Engineering Services 0.070 0.690 Other Costs 0.327 Total 1 0.332 6.273 1 7.017 Description: The AN/SPN-35 is a precision approach radar that provides glide slope guidance to Navy and Marine Corps aircraft. The system is used in conjunction with a vertical/short take-off and landing, optical landing system and the AN/SPN-41 Instrument Control Landing System for precision landing operations. It is also used for aircraft recovery during adverse weather and night conditions. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 NAWCAD WR Mar 2022 New FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 5.295 1 5.392 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 24 54 Jan 2025 FY 2027 LHA 10 Sep 2034 24 54 Mar 2028 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 21 of 32 P-1 Line #21 Volume 1 - 319 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Electronic Fueling at Sea (EFAS) PARM Code: NSWC PHD FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 1 4.172 Technical Data and Documentation - 0.110 System Engineering - 0.790 Technical Engineering Services - 0.905 Other Costs - Total 0 0.850 - 1 6.827 Description: Due to the obsolescence of specialized equipment on the Legacy Fueling At Sea system, NSWC Port Hueneme is developing an updated system based on more commonly accessible parts utilizing a Variable Frequency Drive system and PLCs. The LHA CDD requires a Fueling At Sea capability which cannot be met without this system. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 LHA 10 TBD TBD TBD New/Option Quantity Unit Cost 1 4.172 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2027 LHA 10 Sep 2034 0 24 Sep 2032 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 22 of 32 P-1 Line #21 Volume 1 - 320 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA) AN/SRC-55 PARM Code: SEA05H FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 2.924 1 3.083 Technical Data and Documentation 0.179 0.140 Spares 0.064 0.192 System Engineering 0.952 0.350 Technical Engineering Services 0.672 1.468 Other Costs 1.234 Total 1 1.316 6.025 1 6.549 Description: AN/SRC-55 HYDRA is a Wireless Interior Communications System that provides wire free mobile communications throughout the ship. HYDRA supports security, navigation, combat systems, engineering, damage control, maintenance and general operations such as maneuvering and docking, shore patrol and beach guard. It is interoperable with other shipboard communication systems and it has improved capabilities over the legacy wireless systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 L3Harris C/FFP Mar 2024 New FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 2.924 1 3.083 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 30 12 Required Award Date Jan 2028 FY 2027 LHA 10 Sep 2034 30 12 Mar 2031 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 23 of 32 P-1 Line #21 Volume 1 - 321 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Ring Laser Gyro Navigator (RLGN) AN/WSN-12 PARM Code: PEO IWS6.0 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 4.038 1 4.772 Technical Data and Documentation - 0.230 Spares - 0.573 System Engineering 0.255 0.233 Technical Engineering Services 0.356 0.413 Other Costs 0.867 Total 1 0.262 5.516 1 6.483 Description: The AN/WSN-7(V) Ring Laser Gyro Navigation System provides real-time navigation data for use by navigation and combat systems. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Northrop Grumman Systems Corporation C/FFP Jun 2021 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 4.038 1 4.772 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 24 17 Feb 2028 FY 2027 LHA 10 Sep 2034 24 17 Apr 2031 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 24 of 32 P-1 Line #21 Volume 1 - 322 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Amphibious Air Traffic Control Direct Altitude and Identity Readout (AATC-DAIR) / SYY-1 PARM Code: NAVAIR PMA213 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.834 1 3.694 Spares 0.073 0.083 System Engineering 0.288 0.198 Technical Engineering Services 0.197 0.090 Other Costs 0.941 Total 1 0.922 5.333 1 4.987 Description: The Amphibious Air Traffic Control (AATC) Direct Altitude and Identity Readout (DAIR) is an automatic beacon and radar that when integrated with an air traffic control radar, provides numeric and symbolic displays of position, identity, and altitude of aircraft in the terminal airspace on an operator's Plane Position Indicator (PPI) display. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 NAWCAD WR Mar 2022 New FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 3.834 1 3.694 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 24 24 Jul 2027 FY 2027 LHA 10 Sep 2034 24 24 Sep 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 25 of 32 P-1 Line #21 Volume 1 - 323 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Aircraft Approach Control Transmitting Set (AACTS) AN/SPN-41B PARM Code: N/A FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 3.618 0 - System Engineering 0.616 - Technical Engineering Services 0.065 - Other Costs 0.318 Total 1 - 4.617 0 - Description: N/A Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 NAWCAD WR Mar 2022 New Quantity Unit Cost 1 3.618 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 34 44 Jan 2025 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 26 of 32 P-1 Line #21 Volume 1 - 324 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Enterprise Air Surveillance Radar (EASR) PARM Code: PEO IWS2.0 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 23.735 1 20.239 Technical Data and Documentation 0.034 0.033 Spares 0.833 0.633 System Engineering 1.663 5.792 Technical Engineering Services 2.233 13.685 Other Costs 9.764 Total 1 11.111 38.262 1 51.493 Description: Enterprise Air Surveillance Radar (EASR) suite will be a modern, long-range, three-dimensional (3-D) radar used to search, detect and provide space-stabilized, three-coordinate (range, bearing, height) data for air intercept control and designation to a weapon system and Air Traffic Control (ATC) system. The LHA(R) Flight 1 configuration includes a rotating antenna array, below decks radar and cooling equipment. Without the EASR suite, LHA(R) Flight 1 ships will not have an air-search radar for self-defense and airspace deconfliction. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Raytheon C/FFP May 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 23.735 1 20.239 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 31 28 Aug 2026 FY 2027 LHA 10 Sep 2034 31 28 Oct 2029 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 27 of 32 P-1 Line #21 Volume 1 - 325 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: NATO Sea Sparrow Missile System (NSSMS) MK 57 Mod 14 PARM Code: PEO IWS3.0 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 26.442 1 32.374 Spares 1.444 1.763 System Engineering 1.464 1.903 Technical Engineering Services 2.387 2.395 Other Costs 2.388 Total 1 5.128 34.125 1 43.563 Description: The NATO Sea Sparrow Missile System (NSSMS) MK 57 is a short-range weapon system, which provides self-defense capability against air-to-surface missiles, surface-to-surface missiles, manned attack aircraft, and surface craft. The system is designed to provide these capabilities under both clear and adverse environmental conditions as well as in a hostile electronics attack environment. NSSMS MK 57 performs target engageability; and provides launcher control, missile control and missing firing orders. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 SAAB C/FFP Jul 2023 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 26.442 1 32.374 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 33 36 Required Award Date Oct 2025 FY 2027 LHA 10 Sep 2034 33 36 Dec 2028 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 28 of 32 P-1 Line #21 Volume 1 - 326 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: MK31 Mod 3, Rolling Airframe Missile (RAM) (Tech Refresh) PARM Code: PEO IWS3B FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 2 Total Cost (Each) ($ M) 17.974 2 21.930 Technical Data and Documentation 0.473 0.154 Spares 0.103 0.888 System Engineering 2.093 0.673 Technical Engineering Services 0.279 0.694 Other Costs 1.368 Total 2 0.503 22.290 2 24.842 Description: The MK 49 Mod 3 Rolling Airframe Missile (RAM) Weapon System is a lightweight, low cost, high power system for anti-ship missile defense against current and evolving threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Raytheon C/FFP Apr 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 2 8.987 2 10.965 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 41 30 Aug 2025 FY 2027 LHA 10 Sep 2034 41 30 Oct 2028 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 29 of 32 P-1 Line #21 Volume 1 - 327 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: PHALANX Block 1B MK15 Mod 21 & 22, Close-in Weapon System (CIWS) PARM Code: PEO IWS3.0 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 15.378 1 19.107 Technical Data and Documentation 0.055 0.058 Spares 0.177 0.559 System Engineering 0.705 0.746 Technical Engineering Services 0.545 0.768 Other Costs 1.598 Total 1 2.337 18.458 1 23.575 Description: Phalanx is a high fire rate Close-In Weapon System (CIWS) that automatically acquires, tracks and destroys anti-ship cruise missiles, helicopters, aircraft, and all types of Surface threats. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Raytheon C/FFP Mar 2023 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 15.378 1 19.107 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 29 26 Dec 2026 FY 2027 LHA 10 Sep 2034 29 26 Feb 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 30 of 32 P-1 Line #21 Volume 1 - 328 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: AN/SPQ-9B Radar Set PARM Code: PEO IWS2B FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 5.144 1 8.314 Technical Data and Documentation 0.134 0.151 Spares 0.247 0.396 System Engineering 0.418 0.468 Technical Engineering Services 0.790 0.849 Other Costs 0.895 Total 1 1.062 7.628 1 11.240 Description: The AN/SPQ-9B is an X-Band Horizon Search, pulse Doppler, frequency agile radar designed for the littoral environment. It has a very high clutter improvement factor supporting a very low false track rate in the littorals and in high clutter environments. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 DRS Leonardo C/FFP Sep 2022 Option FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 5.144 1 8.314 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2023 LHA 9 Jul 2031 24 24 Required Award Date Jul 2027 FY 2027 LHA 10 Sep 2034 24 24 Sep 2030 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 31 of 32 P-1 Line #21 Volume 1 - 329 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Vertical/Stationary Take-Off Landing Optical Landing System (VSTOL OLS) PARM Code: NAVAIR PMA251 FY 2023 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) ($ M) 13.323 1 6.952 System Engineering 0.379 0.391 Technical Engineering Services 0.608 0.691 Other Costs 0.955 0.941 Spares - Total 1 0.078 15.265 1 9.053 Description: The Vertical/Stationary Take-Off Landing (VSTOL) Optical Landing System (OLS) is a visual landing aid that displays glide path and trend information to the VSTOL pilot preparing to land on ship. The system can guide an aircraft to the ship from a distance of 0.8 nautical miles. The OLS guides the aircraft to 50 feet above the flight deck up to the final approach phase. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2023 LHA 9 Lakehurst Manufacturing WR Feb 2021 New FY 2027 LHA 10 TBD TBD TBD Quantity Unit Cost 1 13.323 1 6.952 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2023 LHA 9 Jul 2031 30 48 Jan 2025 FY 2027 LHA 10 Sep 2034 30 48 Mar 2028 Competition/Second Source Initiatives: N/A LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 32 of 32 P-1 Line #21 Volume 1 - 330 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 First System (2027) Award Date: First System (2027) Completion Date: Cost Elements Interval Between Systems: 0 Months Production Leadtime When Required* - - (Months) (Months) FY 2025 FY 2026 ($ M) FY 2027 ($ M) FY 2028 ($ M) FY 2029 ($ M) FY 2030 ($ M) FY 2031 ($ M) ($ M) LHA 10 Advance Procurement Basic Construction Total: LHA 10 Advance Procurement 61.118 - 0.000 - - - - 61.118 - - - - - - - - 0.000 450.000 400.000 - - - - - 450.000 400.000 - - 61.118 - - 450.000 400.000 - - LHA 11 Advance Procurement Basic Construction Various Various Total: LHA 11 Advance Procurement Total Advance Procurement/Obligation Authority *Note: "When Required" is the number of months required before ship delivery. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 1 of 2 P-1 Line #22 Volume 1 - 331 === page 382 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Date: April 2026 P-1 Line Item Number / Title: 3041 / LHA Replacement Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2027 Cost Elements Production Leadtime When Required* (Months) (Months) Contract Forecast Date Unit Cost ($ M) 2027 Qty For FY (Each) Total Cost Request ($ M) LHA 10 Advance Procurement Basic Construction - - - - 0.000 Total: LHA 10 Advance Procurement - LHA 11 Advance Procurement Basic Construction Various Various - - 0.000 Total: LHA 11 Advance Procurement - Total Advance Procurement/Obligation Authority - Description: Advance Procurement funding will be used to purchase Long Lead Time Material (LLTM) and maintain production schedule. LLTM procurements will include, but not be limited to, Port Deck Edge Elevator Machinery, Steering Gear, Ship Service Diesel Generators, Main Reduction Gear, Oily Waste Ultrafiltration, A/C Chilled Water Plant, and 450/60Hz Switchboard. The FY 2026 Total for Advance Procurement for LHA 10 does not show $589,963 thousand of advance procurement funded in FY 2026 mandatory funding. *Note: "When Required" is the number of months required before ship delivery. LI 3041 - LHA Replacement Navy UNCLASSIFIED Page 2 of 2 P-1 Line #22 Volume 1 - 332 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3043 / Expeditionary Fast Transport (EPF) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Prior Years 15 3,649.588 200.144 Less Program Support ($ in Millions) 2.732 Net Procurement (P-1) ($ in Millions) 3,446.712 Plus CY Advance Procurement ($ in Millions) Plus Cost To Complete ($ in Millions) Plus Program Support ($ in Millions) Total Obligation Authority ($ in Millions) 160.090 2.732 3,609.534 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 15 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 3,649.588 - - - - - - - - - - - - - - - - - - - - Total 200.144 - - - - - - - - - - 2.732 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 3,446.712 - - - - - - - - - - - 11.231 8.423 - 8.423 7.500 6.400 6.500 - - 200.144 - - - - - - - - - - 2.732 0.000 11.231 8.423 0.000 8.423 7.500 6.400 6.500 0.000 - 3,649.588 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 130.552 7.500 8.554 4.485 - 4.485 12.340 25.447 0.300 1.496 - 190.674 3,740.086 7.500 19.785 12.908 - 12.908 19.840 31.847 6.800 1.496 - 3,840.262 243.306 - - - - - - - - - - 243.306 Description: Future joint forces will be responsive, deployable, agile, versatile, lethal, survivable, and sustainable. The nation will need lift assets that can provide for assured access, decrease predictability and dwell time, and have the capacity to quickly deliver troops and equipment together in a manner that provides for unit integrity. Expeditionary Fast Transport (EPF) (formerly Joint High Speed Vessel) will provide combatant commanders high-speed intra-theater sealift with inherent cargo handling capability and the agility to achieve positional advantage over operational distances. Not limited to major ports, the EPF will be able to operate in austere port environments. EPFs 15 and EPF 16 have modifications to conduct a Role 2 (R2) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET) teams while retaining the ability to perform high-speed intra-theater sealift. EMS 1-3 will have modifications to conduct a Role 2 (R2) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET). LI 3043 - Expeditionary Fast Transport (EPF) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #23 Volume 1 - 333 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3043 / Expeditionary Fast Transport (EPF) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Aluminum Catamaran 338 ft 93.5 ft 2359 Long Tons 12.5 ft Production Status: EPF 16 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date May 2022 54 months 38 months Nov 2026 Feb 2027 Jan 2028 (1) EMS 2 EMS 3 Dec 2023 Dec 2023 Dec 2023 72 months 40 months Dec 2029 Mar 2030 Feb 2031 84 months 40 months Dec 2030 Mar 2031 Feb 2032 96 months 40 months Dec 2031 Mar 2032 Feb 2033 EMS 1 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Jan 2007 Jul 2008 Contract Design Jan 2007 Jul 2008 Detail Design Nov 2008 Dec 2009 Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: CLASS C Footnotes: (1) EMS 1-3 Contract Award date of December 2023 reflects the Detail Design and Construction (DD&C) Undefinitized Contract Award (UCA) which is anticipated to definitize Q3 FY 2026. LI 3043 - Expeditionary Fast Transport (EPF) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #23 Volume 1 - 334 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3043 / Expeditionary Fast Transport (EPF) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2022 Cost Categories Plan Costs Qty FY 2023 Total Cost (Each) Qty ($ M) 2 Total Cost (Each) 27.000 ($ M) 2 - Basic Construction/Conversion 493.000 537.663 Change Orders 10.500 10.753 Electronics 46.000 56.504 Hull, Mechanical, and Electrical (HM&E) 26.100 35.632 Other Cost 14.854 17.048 Total Ship Estimate 617.454 657.600 Less Cost to Complete FY 2026 11.231 Less Cost to Complete FY 2027 8.423 - Less Cost to Complete FY 2028 6.800 0.700 Less Cost to Complete FY 2029 1.000 5.400 Less Cost to Complete FY 2030 - Net P-1 Funding 590.000 - 6.500 645.000 Remarks: 1. FY2027 Cost to Complete Funds in HM&E and Other categories support programmatic expenses, including Government-Furnished Equipment management, test and trials support, and government oversight (both headquarters and waterfront) for EPF 16 ($3.223M) and EMS 1 ($5.200M). 2. FY2028 Cost to Complete Funds in HM&E and Other categories support programmatic expenses, including Government-Furnished Equipment management, test and trials support, and government oversight (both headquarters and waterfront) for EMS 1 ($6.800M) & EMS 2 ($0.700M). 3. FY2029 Cost to Complete Funds in HM&E and Other categories support programmatic expenses, including Government-Furnished Equipment management, test and trials support, and government oversight (both headquarters and waterfront) for EMS 1 ($1.000M) & EMS 2 ($5.400M). 4. FY2030 Cost to Complete Funds in HM&E and Other categories support programmatic expenses, including Government-Furnished Equipment management, test and trials support, and government oversight (both headquarters and waterfront) for EMS 2 ($6.500M). LI 3043 - Expeditionary Fast Transport (EPF) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #23 Volume 1 - 335 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3043 / Expeditionary Fast Transport (EPF) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date EPF 16 AUSTAL 2022 May 2022 Sep 2023 Nov 2026 (1) AUSTAL 2022 Dec 2023 Aug 2026 Dec 2029 EMS 2 AUSTAL 2023 Dec 2023 Aug 2027 Dec 2030 EMS 3 AUSTAL 2023 Dec 2023 Aug 2028 Dec 2031 EMS 1 Footnotes: (1) EMS 1-3 Contract Award date of December 2023 reflects the Detail Design and Construction (DD&C) Undefinitized Contract Award (UCA) which is anticipated to definitize Q3 FY 2026. LI 3043 - Expeditionary Fast Transport (EPF) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #23 Volume 1 - 336 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Medium Landing Ship Program Elements for Code B Items: N/A Other Related Program Elements: 0603563N, 0603564N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 - - 0.000 29.668 - - 0.000 29.668 - - 0.000 29.668 FY 2026 2 800.000 800.000 800.000 FY 2027 Base FY 2027 OOC FY 2027 Total - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 6 4 4 3 2 21 1,765.000 1,191.000 1,166.000 839.310 576.326 6,367.304 1,765.000 1,765.000 1,191.000 1,191.000 1,166.000 1,166.000 839.310 839.310 576.326 6,367.304 576.326 6,367.304 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) - - - - - 4.256 27.558 0.536 0.564 76.037 108.951 Total ($ in Millions) - 29.668 800.000 - - - - 1,769.256 1,218.558 1,166.536 839.874 652.363 6,476.255 Gross/Weapon System Unit Cost ($ in Millions) - - 400.000 - - - 294.167 297.750 291.500 279.770 288.163 303.205 Description: Medium Landing Ship (LSM) is a medium-sized landing ship that enables distributed maneuver and logistics such as Distributed Maritime Operations (DMO), Littoral Operations in a Contested Environment (LOCE), and Expeditionary Advanced Base Operations (EABO), in support of the Marine Littoral Regiment (MLR). It is designed to fill the gap in capability between the Navy's large, multipurpose amphibious warfare class ships and smaller landing vessels. This ship will deploy tailored logistics, select power projection and support strike capabilities via the embarked MLR. The FY26 NDAA introduced a new acquisition requirement, mandating the use of a Vessel Construction Manager (VCM) for the LSM program. To leverage the VCM authorization and accelerate delivery, the Navy will designate the LSM program as a Middle Tier of Acquisition - Rapid Fielding (MTA-RF) effort. This approach will more quickly field the LSM, a vessel designed to transport and land naval expeditionary forces and their equipment in contested environments to support the Marine Corps' Force Design in the Indo-Pacific. One ship is directed to Bollinger, and four directed to Fincantieri Marinette Marine, with the remaining ships planned to be competitively awarded by the VCM. With the authorities granted in Section 128 of the FY 2025 National Defense Authorization Act (NDAA), the LSM program procured an existing design to construct a Non-Developmental Vessel (NDV). Top Level Requirements were approved in January 2025, enabling the selection of Damen Naval Landing Ship Transport (LST) 100 design in December 2025. Licensing an existing design has streamlined the design schedule with a complete contract design package ready to provide the winning VCM. This acquisition strategy is a key component of the Navy and Marine Corps' effort to address readiness in the Indo-Pacific and reflects a change in how the Navy traditionally contracts and oversees ship construction. Leveraging this new approach, the VCM will hold the prime contract with the Navy and, in turn, issue and manage its own commercial subcontracts directly with the shipyards. This places the VCM in direct contractual control of shipyard performance and creates a buffer that, along with a proven and unchanging design, is expected to reduce cost and schedule risks. The Commandant of the Marine Corps requirement for 35 Medium Landing Ships remains its primary modernization effort for distributed littoral operations, with a near-term Littoral Maneuver Bridging Solution needed until the LSM fleet is fielded. Littoral mobility is essential for the maneuver and sustainment of forces on critical littoral terrain within archipelagic environments, enhancing expeditionary agility and lethality. To address the recognized littoral mobility gap in the Indo-Pacific, the Marine Corps and Navy are developing the Medium Landing Ship. The LSM is designed to improve beach access, sustainment, and maneuverability in contested littoral environments, supporting the persistence of Naval Expeditionary Forces across the region. The FY 2027 request for LSM includes $0 thousand and quantity of 0 of discretionary and $1,887,500 thousand and quantity of 6 of mandatory for a total of $1,887,500 thousand and a quantity of 6. $1,698,000 thousand of the mandatory funds will procure 6 LSMs. $189,500 thousand of the mandatory funds will be used to enhance the U.S surface maritime industrial base productivity in various areas including supplier LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 1 of 11 P-1 Line #24 Volume 1 - 337 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603563N, 0603564N Line Item MDAP/MAIS Code: N/A development, shipyard infrastructure, strategic sourcing, workforce development, technology opportunities, and wages. The $1,698,000 thousand of the FY 2027 mandatory funds continue efforts from FY 2026 to procure additional LSMs. The $189,500 thousand of the FY 2027 funds are different from the FY 2026 mandatory funds that were not provided for industrial base support. The FY 2026 spend plan amount for LSM includes $800,000 thousand and quantity of 2 of discretionary and $1,963,941 thousand and quantity of 8 of mandatory funding for a total of $2,763,941 thousand and a quantity of 10. Characteristics: Length Overall Beam Displacement Draft Systems: 330 ft 52.5 ft 2,577 LTs 12.6 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date LI 3050 - Medium Landing Ship Navy Electronics Lightship LSM 1 (1) Aug 2026 36 months 35 months Aug 2029 Jan 2030 Dec 2030 (8) -Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C5ISR) -Total Ship Computing Environment (TSCE) -Common Aviation Command and Control System (CAC2S) LSM 2 (2) Aug 2026 LSM 3 (3) Aug 2026 41 months 33 months Jan 2030 May 2030 Apr 2031 53 months 33 months Jan 2031 May 2031 Apr 2032 LSM 11 LSM 9 LSM 10 Aug 2026 Aug 2026 53 months 33 months Jan 2031 May 2031 Apr 2032 43 months 36 months Mar 2030 Jul 2030 Jun 2031 49 months 36 months Sep 2030 Jan 2031 Dec 2031 LSM 15 (13) May 2027 41 months 36 months Oct 2030 Feb 2031 Jan 2032 (4) Aug 2026 36 months 35 months Aug 2029 Jan 2030 Dec 2030 Aug 2026 LSM 8 LSM 4 LSM 16 (9) May 2027 59 months 36 months Apr 2032 Aug 2032 Jul 2033 LSM 5 (5) Aug 2026 64 months 32 months Dec 2031 Apr 2032 Mar 2033 LSM 12 (10) May 2027 70 months 35 months Mar 2033 Aug 2033 Jul 2034 LSM 6 (6) Aug 2026 37 months 35 months Sep 2029 Jan 2030 Dec 2030 LSM 13 (11) May 2027 82 months 35 months Mar 2034 Aug 2034 Jun 2035 LSM 7 (7) Aug 2026 41 months 33 months Jan 2030 May 2030 Apr 2031 LSM 14 (12) May 2027 94 months 35 months Mar 2035 Jul 2035 Jun 2036 (14) May 2027 47 months 36 months Apr 2031 Aug 2031 Jul 2032 UNCLASSIFIED Page 2 of 11 P-1 Line #24 Volume 1 - 338 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Medium Landing Ship Program Elements for Code B Items: N/A Other Related Program Elements: 0603563N, 0603564N Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A Nov 2025 Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design Dec 2025 Mar 2026 Detail Design N/A N/A Request for Proposals Feb 2026 Apr 2026 Design Agent Damen Naval Reissue Reissue Complete / Response Classification of Cost Estimate: CLASS C Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship (10) (11) (12) (13) (14) *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 3 of 11 P-1 Line #24 Volume 1 - 339 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 (†) Cost Categories indicates the presence of a P-8a FY 2025 Qty (Each) Plan Costs FY 2026 Total Cost Qty ($ M) 0 (Each) 20.320 FY 2027 Total Cost Qty ($ M) Total Cost (Each) 10 - ($ M) 6 - Basic Construction/Conversion - 606.925 - Change Orders - 14.720 - 3.400 49.738 - - 0.923 - - 0.589 - Other Cost 5.948 127.105 - Total Ship Estimate 29.668 800.000 - Net P-1 Funding 29.668 800.000 - Electronics (†) Hull, Mechanical, and Electrical (HM&E) Ordnance (†) (†) Remarks: The FY 2026 Total Ship Estimate is funded with $800,000 thousand of FY 2026 discretionary funding and $1,943,941 thousand of FY 2026 mandatory funding for a total of $2,763,941 thousand and a quantity of 10. The FY 2027 Total Ship Estimate is funded with $0 thousand of FY 2027 discretionary funding and $1,887,500 thousand of FY 2027 mandatory funding for a total of $1,887,500 thousand and a quantity of 6. The FY 2027 Total Ship Estimate includes $189,500 thousand of funds for industrial base support. FY 25 funds will finance plans, electronics, and support costs on the lead LSM. After delivery of the LSM from the VCM, the ships will be transited to a post-delivery location to install GFE and transition these commercially built ships into deployable Navy assets. This will include installation of Navy specific equipment and systems including command, control, networks, communications, weapons, IFF, and RHIBs. Additionally, while at the post-delivery location, final outfitting, configuration verification, crew training and qualification, as well as preparations for sail away and Fleet introduction will take place. LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 4 of 11 P-1 Line #24 Volume 1 - 340 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LSM 1 (1) Bollinger 2026 Aug 2026 Sep 2026 Aug 2029 LSM 2 (2) Fincantieri Marinette Marine 2026 Aug 2026 Sep 2026 Aug 2029 LSM 3 (3) Fincantieri Marinette Marine 2026 Aug 2026 Apr 2027 Jan 2030 LSM 4 (4) Fincantieri Marinette Marine 2026 Aug 2026 Apr 2028 Jan 2031 LSM 5 (5) Fincantieri Marinette Marine 2026 Aug 2026 Apr 2029 Dec 2031 LSM 6 (6) TBD 2026 Aug 2026 Oct 2026 Sep 2029 LSM 7 (7) TBD 2026 Aug 2026 Apr 2027 Jan 2030 LSM 8 (8) TBD 2026 Aug 2026 Apr 2028 Jan 2031 LSM 9 TBD 2026 Aug 2026 Mar 2027 Mar 2030 LSM 10 TBD 2026 Aug 2026 Sep 2027 Sep 2030 (9) TBD 2027 May 2027 Apr 2029 Apr 2032 LSM 12 (10) TBD 2027 May 2027 Apr 2030 Mar 2033 LSM 13 (11) TBD 2027 May 2027 Apr 2031 Mar 2034 LSM 14 (12) TBD 2027 May 2027 Apr 2032 Mar 2035 LSM 15 (13) TBD 2027 May 2027 Oct 2027 Oct 2030 LSM 16 (14) TBD 2027 May 2027 Apr 2028 Apr 2031 LSM 17 TBD 2028 May 2028 Oct 2028 Oct 2031 LSM 18 TBD 2028 May 2028 Apr 2029 Apr 2032 LSM 19 TBD 2028 May 2028 Apr 2030 Apr 2033 LSM 20 TBD 2028 May 2028 Apr 2031 Mar 2034 LSM 21 TBD 2028 May 2028 Apr 2032 Mar 2035 LSM 22 TBD 2028 May 2028 Apr 2033 Mar 2036 LSM 23 TBD 2029 May 2029 Oct 2029 Oct 2032 LSM 24 TBD 2029 May 2029 Apr 2030 Apr 2033 LSM 25 TBD 2029 May 2029 Apr 2031 Apr 2034 LSM 26 TBD 2029 May 2029 Apr 2032 Mar 2035 LSM 27 TBD 2030 May 2030 Oct 2030 Oct 2033 LSM 28 TBD 2030 May 2030 Apr 2031 Apr 2034 LSM 29 TBD 2030 May 2030 Apr 2032 Apr 2035 LSM 30 TBD 2030 May 2030 Apr 2033 Mar 2036 LSM 11 LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 5 of 11 P-1 Line #24 Volume 1 - 341 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction LSM 31 TBD 2031 May 2031 Oct 2031 Delivery Date Oct 2034 LSM 32 TBD 2031 May 2031 Apr 2032 Apr 2035 LSM 33 TBD 2031 May 2031 Apr 2033 Apr 2036 Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship (10) (11) (12) (13) (14) *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship *Reconciliation Ship LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 6 of 11 P-1 Line #24 Volume 1 - 342 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Electronics Qty FY 2026 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C5ISR) 0 - 2 Total Ship Computing Environment (TSCE) 0 - 2 P-35 Items Subtotal - 29.450 8.942 38.392 Major Items Common Aviation Command and Control System (CAC2S) 1 Major Items Subtotal 3.400 2 3.400 4.990 4.990 Other Cost Elements Miscellaneous Electronics 0 Other Cost Elements Subtotal Total Electronics LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 7 of 11 - 2 6.356 - 6.356 3.400 49.738 P-1 Line #24 Volume 1 - 343 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Hull, Mechanical, and Electrical (HM&E) Qty FY 2026 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) Other Cost Elements Miscellaneous HM&E 0 - 2 0.923 Other Cost Elements Subtotal - 0.923 Total Hull, Mechanical, and Electrical (HM&E) - 0.923 LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 8 of 11 P-1 Line #24 Volume 1 - 344 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 FY 2025 Ordnance Qty FY 2026 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) Other Cost Elements Miscellaneous Ordnance 0 - 2 0.589 Other Cost Elements Subtotal - 0.589 Total Ordnance - 0.589 LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 9 of 11 P-1 Line #24 Volume 1 - 345 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Command, Control, Communication, Computer Intelligence Surveillance and Reconnaissance (C5ISR) PARM Code: PEO C5ISR FY 2025 FY 2026 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 2 21.763 Technical Data and Documentation - 0.501 System Engineering - 2.533 Technical Engineering Services - 1.708 Other Costs - Total 0 2.945 - 2 29.450 Description: C5I systems suite provides the vital links between the ship, the command hierarchy, and other operational forces, enabling full integration into the joint battlespace. The communications package includes Lineof-Sight (LOS), Beyond Line-of-Sight (BLOS), and Satellite Communications (SATCOM) to ensure redundant and reliable voice and data connectivity with joint forces, shore commands, and other assets in any environment. The C5I suite provides access to secure military-coded GPS signals for precise and jam-resistant Position, Navigation, and Timing (PNT) data, which is critical for safe navigation and weapons system accuracy. Support services are included for associated Advanced Individual Training (AIT) and System Operational Verification Testing (SOVT) to ensure systems are correctly operated and fully integrated. Contract Data/Delivery Date reflects FY 2026 discretionary ship LSM 9. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2026 LSM 1 Various Various TBD Various Quantity Unit Cost 2 10.882 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2026 LSM 1 Mar 2030 19 0 Feb 2028 Competition/Second Source Initiatives: N/A LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 10 of 11 P-1 Line #24 Volume 1 - 346 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Medium Landing Ship Appropriation / Budget Activity / Budget Sub Activity: 1611N / 03 / 1 Equipment Item: Total Ship Computing Environment (TSCE) PARM Code: Naval Surface Warfare Center Dahlgren Division FY 2025 FY 2026 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 0 Total Cost (Each) - ($ M) 2 6.528 System Engineering - 0.984 Technical Engineering Services - 0.536 Other Costs - Total 0 0.894 - 2 8.942 Description: Total Ship Computing Environment (TSCE) is the foundational shipboard network essential for mission execution and cyber defense. It enables robust Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) capabilities, allowing the vessel to contribute to and utilize beyond-line-of-sight battlespace awareness data critical for mission planning, execution, and multi-domain integration missions. TSCE establishes and maintains the ship's cyber defense boundary, protecting critical systems from adversary intrusion and information warfare attacks. The network hosts core functions required for daily operations, including domain services, email, and other administrative and quality-of-life applications for the crew. Funding also includes associated Advanced Individual Training (AIT) for system operators and comprehensive System Operational Verification Testing (SOVT) to ensure full capability deployment. Contract Data/Delivery Date reflects FY 2026 discretionary ship LSM 9. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2026 LSM 1 Various Various TBD Various Quantity Unit Cost 1 3.264 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2026 LSM 1 Mar 2030 19 26 Dec 2025 Competition/Second Source Initiatives: N/A LI 3050 - Medium Landing Ship Navy UNCLASSIFIED Page 11 of 11 P-1 Line #24 Volume 1 - 347 === page 398 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 348 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5010 / AS Submarine Tender Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Prior Years Resource Summary FY 2025 FY 2026 - - - 0.000 0.000 0.000 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - 0.000 0.000 0.000 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC 2 4,444.000 4,444.000 4,444.000 FY 2027 Total 0.000 FY 2030 - - - - - 2 0.000 0.000 0.000 0.000 - 4,444.000 4,444.000 4,444.000 0.000 FY 2029 2 0.000 To FY 2031 Complete FY 2028 4,444.000 - - - - - 0.000 0.000 0.000 0.000 - Total 4,444.000 - - - - - 0.000 0.000 0.000 0.000 - 4,444.000 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) - - - 4,444.000 - 4,444.000 - - - - - 4,444.000 Gross/Weapon System Unit Cost ($ in Millions) - - - 2,222.000 - 2,222.000 - - - - - 2,222.000 Description: The Submarine Tender will be designed to conduct steady state and wartime sustained, forward-based / expeditionary tending, resupply, depot and intermediate level repair operations on submarines while anchored or pier side. In steady state, the Submarine Tender will provide pier side support in a forward deployed submarine homeport, providing sustained repair, supply, weapons handling, and tending operations for submarines. The Submarine Tender will support deployed VIRGINIA class (VCS), COLUMBIA class (CLB) and future generation submarines. In addition, the submarine tender will provide radiological emergency response. Submarine Tenders will be built to commercial standards, including American Bureau of Shipping (ABS) rules and U.S. Coast Guard (USCG) regulations, and will utilize Commercial off-the-shelf (COTS) and Government Furnished Program of Record (POR) systems and equipment as well as Military Specification standards for designated areas including Nuclear Support Facility (NSF). Characteristics: Length Overall Beam Displacement Draft - Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date AS 1 AS 2 79 months 49 months Nov 2033 Feb 2034 Jan 2035 85 months 49 months May 2034 Aug 2034 Jul 2035 Apr 2027 Apr 2027 Design Schedule Start / Issue Complete / Response Reissue Reissue Complete / Response Issue Date for TLR Sep 2021 N/A N/A N/A LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 1 of 9 P-1 Line #26 Volume 1 - 349 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5010 / AS Submarine Tender Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Reissue Reissue Complete / Response Issue Date for TLS N/A N/A N/A N/A Preliminary Design Apr 2022 Sep 2023 Jan 2025 Jul 2025 Contract Design Jul 2025 Sep 2027 N/A N/A Detail Design Apr 2027 Apr 2030 N/A N/A Request for Proposals Jul 2023 N/A Oct 2026 N/A Design Agent Classification of Cost Estimate: Justification: This program is a new start in FY27. LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 2 of 9 P-1 Line #26 Volume 1 - 350 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 (†) P-1 Line Item Number / Title: 5010 / AS Submarine Tender FY 2027 Cost Categories Qty indicates the presence of a P-8a Plan Costs 145.800 (†) Hull, Mechanical, and Electrical (HM&E) 276.770 3,643.700 Change Orders Ordnance ($ M) 2 Basic Construction/Conversion Electronics Total Cost (Each) 203.887 (†) 144.846 (†) 14.887 Other Cost 14.110 Total Ship Estimate 4,444.000 Net P-1 Funding 4,444.000 LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 3 of 9 P-1 Line #26 Volume 1 - 351 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5010 / AS Submarine Tender Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction AS 1 TBD 2027 Apr 2027 Oct 2029 Nov 2033 AS 2 TBD 2027 Apr 2027 Apr 2030 May 2034 LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 4 of 9 P-1 Line #26 Delivery Date Volume 1 - 352 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5010 / AS Submarine Tender FY 2027 Qty Electronics Total Cost (Each) ($ M) P-35 Items C4ISR 2 P-35 Items Subtotal 194.988 194.988 Major Items Aviation Electronics 2 Major Items Subtotal 8.899 Total Electronics LI 5010 - AS Submarine Tender Navy 8.899 203.887 UNCLASSIFIED Page 5 of 9 P-1 Line #26 Volume 1 - 353 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5010 / AS Submarine Tender FY 2027 Qty Hull, Mechanical, and Electrical (HM&E) Total Cost (Each) ($ M) Major Items Material Handling Equipment 14.537 Boats (Rigid Inflatable Boat, 11 meter) 4 Boats (Rigid Inflatable Boat, 7 meter) 4 Major Items Subtotal 3.451 4.604 22.592 Other Cost Elements Miscellaneous HM&E 122.254 Other Cost Elements Subtotal 122.254 Total Hull, Mechanical, and Electrical (HM&E) 144.846 LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 6 of 9 P-1 Line #26 Volume 1 - 354 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5010 / AS Submarine Tender FY 2027 Qty Ordnance Total Cost (Each) ($ M) P-35 Items MK 38 Machine Gun System 4 14.887 P-35 Items Subtotal 14.887 Total Ordnance 14.887 LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 7 of 9 P-1 Line #26 Volume 1 - 355 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5010 / AS Submarine Tender Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: C4ISR PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 113.596 Spares 8.110 System Engineering 17.782 Technical Engineering Services 19.692 Other Costs 0.002 Logistics 4.354 Systems Test and Evaluation 5.166 Program Management 17.416 Software 5.656 Data 3.214 Total 2 194.988 Description: The Command, Control, Communications, Computer, Intelligence, Surveillance and Reconnaissance (C4ISR) system consist of equipment which is in a containerized environment for secure storage and operation of ship's C2 equipment. The C4ISR Suite consist of (Next Generation Wideband Communications, SMIS (classified and unclassified networks), Military radios to provide VHF, UHF Line of Site, and UHF SATCOM, Commercial Broadband Satellite Program (CBSP) for wideband SATCOM and Consolidated Afloat Networks & Enterprise Services (CANES) and the HYDRA RADIO SYSTEM AN/SRC-5 Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2027 AS 1 Various Various TBD Various Quantity Unit Cost 2 56.798 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery FY 2027 AS 1 Nov 2033 19 Production Leadtime Required Award Date Various Competition/Second Source Initiatives: N/A LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 8 of 9 P-1 Line #26 Volume 1 - 356 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5010 / AS Submarine Tender Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: MK 38 Machine Gun System PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 4 12.760 4 14.887 Technical Engineering Services 2.127 Total Description: The MK 38 Machine Gun System (MGS) is a 30MM automatic gun system that provides ships with a defensive and offensive gunfire capability for the engagement of a variety of surface targets. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2027 AS 1 TBD TBD Various New Quantity Unit Cost 4 3.190 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2027 AS 1 Nov 2033 24 18 Required Award Date Competition/Second Source Initiatives: N/A LI 5010 - AS Submarine Tender Navy UNCLASSIFIED Page 9 of 9 P-1 Line #26 Volume 1 - 357 === page 408 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 358 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P452 Resource Summary Procurement Quantity (Units in Each) Prior Years 10 FY 2025 FY 2026 - 92.106 FY 2027 Base FY 2027 OOC 2 - FY 2029 To FY 2031 Complete FY 2030 Total 2 1 1 1 2 - 17 1,946.063 1,122.661 1,033.286 984.356 2,100.961 - 14,748.193 7,468.760 0.000 Less PY Advance Procurement ($ in Millions) 223.191 - - - - - - - - - - 223.191 Less Cost To Complete ($ in Millions) 895.639 - 83.760 - - - - - - - - 979.399 102.357 - - - - - - - - - - 102.357 - - 20.000 - 13,423.246 Millions) Less Affordability Initiatives ($ in Millions) Net Procurement (P-1) ($ in Millions) 20.000 - - 6,227.573 0.000 8.346 Plus CY Advance Procurement ($ in Millions) 223.191 Plus Cost To Complete ($ in Millions) 396.744 Plus Section 8121 Inflation Funding ($ in Millions) 102.357 Plus Affordability Initiatives ($ in Millions) 20.000 Total Obligation Authority ($ in Millions) 6,969.865 227.154 227.154 96.040 104.386 - 0.000 FY 2028 Gross/Weapon System Cost ($ in Millions) Less Section 8121 Inflation Funding ($ in 1,946.063 FY 2027 Total - 1,946.063 - 0.000 1,946.063 - 241.501 - - - 241.501 - - - - 2,187.564 0.000 2,187.564 1,122.661 1,033.286 984.356 2,100.961 - - - - - 223.191 10.881 7.079 - - - 979.399 - - - - - 102.357 - - 20.000 - 14,748.193 1,133.542 1,040.365 984.356 2,100.961 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 118.278 28.447 63.848 60.335 - 60.335 56.602 52.193 59.380 64.713 357.000 860.796 7,088.143 255.601 168.234 2,247.899 - 2,247.899 1,190.144 1,092.558 1,043.736 2,165.674 357.000 15,608.989 973.032 - 973.032 1,122.661 1,033.286 984.356 1,050.481 746.876 - - - 867.541 Description: The T-AO 205 John Lewis Fleet Oiler Class will recapitalize the existing T-AO 187 fleet oiler class. The Navy's Combat Logistics Force (CLF) oilers supply fuel and dry cargo to Navy ships at sea. The T-AO 205 Class will operate as shuttle ships from resupply posts to customer ships. Additionally, in conjunction with a dry cargo and ammunition ship (T-AKE), they will accompany and stay on-station with a Carrier Strike Group (CSG) to provide fuel as required to customer ships. The FY 2027 request for T-AO includes $1,946,063 thousand and quantity of 2 of discretionary and $282,820 thousand and quantity of 0 of mandatory for a total of $2,228,883 thousand and a quantity of 2. The $282,820 thousand of the mandatory funds will be used to enhance the U.S surface maritime industrial base productivity in various areas including supplier development, shipyard infrastructure, strategic sourcing, workforce development, technology opportunities, and wages. The 2027 funds are different from the FY 2026 mandatory funds that were not provided for industrial base support. The FY 2026 spend plan amount for T-AO includes $104,386 thousand and quantity of 0 of discretionary and $2,725,000 thousand and quantity of 3 of mandatory funding for a total of $2,829,386 thousand and a quantity of 3. LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 1 of 10 P-1 Line #28 Volume 1 - 359 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P452 Characteristics: Length Overall Beam Displacement Draft T-AO 746 ft 106 ft 22,515 MT 33.5 ft (Lightship) (Design) Production Status: T-AO 210 T-AO 211 T-AO 212 T-AO 213 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Mar 2020 Jun 2022 Jun 2022 May 2023 77 months 41 months Aug 2026 Nov 2026 Oct 2027 60 months 39 months Jun 2027 Sep 2027 Aug 2028 66 months 38 months Dec 2027 Mar 2028 Feb 2029 64 months 39 months Sep 2028 Dec 2028 Nov 2029 Production Status: T-AO 217 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date (4) T-AO 218 T-AO 219 May 2026 Mar 2027 Mar 2027 53 months 39 months Oct 2030 Jan 2031 Dec 2031 54 months 37 months Sep 2031 Dec 2031 Nov 2032 60 months 37 months Mar 2032 Jun 2032 May 2033 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design Jun 2016 Sep 2018 Request for Proposals Jun 2015 Dec 2015 T-AO 214 (1) Sep 2024 54 months 39 months Mar 2029 Jun 2029 May 2030 Reissue T-AO 215 Nov 2025 47 months 39 months Oct 2029 Jan 2030 Dec 2030 (2) T-AO 216 (3) Nov 2025 53 months 39 months Apr 2030 Jul 2030 Jun 2031 Reissue Complete / Response Design Agent Classification of Cost Estimate: Footnotes: (1) T-AO 214 and follow-on ships' Delivery dates reflect an in-line production schedule and latest estimates for months to completion that vary between ships due to assumed option exercise, shipyard production backlog, and leadtime for major equipment. LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 2 of 10 P-1 Line #28 Volume 1 - 360 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P452 (2) (3) (4) Reconciliation Ship Reconciliation Ship Reconciliation Ship LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 3 of 10 P-1 Line #28 Volume 1 - 361 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs FY 2020 Total Cost (Each) ($ M) 2 Basic Construction/Conversion Change Orders Electronics FY 2019 Qty (†) Qty FY 2022 Total Cost (Each) ($ M) Qty (Each) 2 FY 2023 Total Cost ($ M) Qty (Each) 2 FY 2024 Total Cost ($ M) 1 Qty FY 2026 Total Cost (Each) ($ M) 1 Qty FY 2027 Total Cost (Each) ($ M) 0 Qty Total Cost (Each) ($ M) 2 1,209.950 1,280.455 1,497.000 766.567 784.573 92.106 1,779.473 9.202 11.686 14.566 8.450 9.000 - 33.244 58.144 78.490 73.212 39.779 51.597 - 98.688 24.838 31.747 31.300 17.922 20.631 - 34.658 - 20.000 20.000 - - - 1,422.378 1,636.078 Hull, Mechanical, and Electrical (HM&E) (†) Other Cost Total Ship Estimate 1,302.134 832.718 865.801 92.106 1,946.063 Less Advance Procurement FY 2018 75.068 - - - - - - Less Advance Procurement FY 2019 - 75.046 - - - - - - Less Subsequent Full Funding FY 2021 20.000 - - - - - Less Cost to Complete FY 2023 106.400 - - - - - - Less Cost to Complete FY 2024 27.060 93.250 2.585 - - - - Less Cost to Complete FY 2025 49.995 151.837 13.222 12.100 - - - Less Cost to Complete FY 2026 15.400 48.260 19.650 6.530 6.200 - - Less Cost to Complete FY 2027 - 16.020 127.000 23.100 1.181 74.200 - Less Cost to Complete FY 2028 - - - 8.400 - 2.481 - Less Cost to Complete FY 2029 - - - - - 7.079 - 5.700 - - - - - - Less STA FY 2019 Less Section 8121 Inflation Funding FY 2023 45.570 36.750 9.837 Net P-1 Funding 976.941 981.215 1,463.784 782.588 858.420 8.346 1,946.063 Remarks: The Department added a net total of $257.1 million in Completion of Prior Year Shipbuilding Programs (cost to complete) funding in FY 2027 to FY 2029 since the FY 2026 budget. The total FY 2027 cost to complete funding request of $241.5 million finances the following: T-AO 210 (FY 20 ship): Economic price adjustment $16.0 million T-AO 211/212 (FY 22 ships): Government portion of shipbuilding contract overrun and economic price adjustment totaling $127.0 million T-AO 213 (FY 23 ship): Government portion of shipbuilding contract overrun and economic price adjustment for $23.1 million T-AO 214 (FY 24 ship): Economic price adjustment for $1.2 million T-AO 217 (FY 26 ship): To finance change orders, electronics, and HM&E requirements $74.2 million LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 4 of 10 P-1 Line #28 Volume 1 - 362 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler A FY 2024 prior approval reprogramming action ($43,000) thousand was approved for T-AO 214. These funds are reflected in FY 2024 and net P-1 funding. The FY 2026 Total Ship Estimate does not show $2,725,000 thousand and quantity of three funded in FY 2026 mandatory funding. Total ship estimate for FY 2026 is $2,817,106 thousand. LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 5 of 10 P-1 Line #28 Volume 1 - 363 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date T-AO 210 GD NASSCO 2020 Mar 2020 Mar 2023 Aug 2026 T-AO 211 GD NASSCO 2022 Jun 2022 Mar 2024 Jun 2027 T-AO 212 GD NASSCO 2022 Jun 2022 Oct 2024 Dec 2027 T-AO 213 GD NASSCO 2023 May 2023 Jun 2025 Sep 2028 T-AO 214 (1) GD NASSCO 2024 Sep 2024 Dec 2025 Mar 2029 T-AO 215 (2) GD NASSCO 2026 Nov 2025 Jul 2026 Oct 2029 T-AO 216 (3) GD NASSCO 2026 Nov 2025 Jan 2027 Apr 2030 T-AO 217 (4) GD NASSCO 2026 May 2026 Jul 2027 Oct 2030 T-AO 218 GD NASSCO 2027 Mar 2027 Aug 2028 Sep 2031 T-AO 219 GD NASSCO 2027 Mar 2027 Feb 2029 Mar 2032 T-AO 220 GD NASSCO 2028 Mar 2028 Aug 2029 Sep 2032 T-AO 221 GD NASSCO 2029 Mar 2029 Aug 2030 Sep 2033 T-AO 222 TBD 2030 Mar 2030 Aug 2031 Sep 2034 T-AO 223 TBD 2031 Mar 2031 Aug 2032 Sep 2035 T-AO 224 TBD 2031 Mar 2031 Feb 2033 Mar 2036 Footnotes: (1) T-AO 214 and follow-on ships' Delivery dates reflect an in-line production schedule and latest estimates for months to completion that vary between ships due to assumed option exercise, shipyard production backlog, and leadtime for major equipment. (2) (3) (4) Reconciliation Ship Reconciliation Ship Reconciliation Ship LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 6 of 10 P-1 Line #28 Volume 1 - 364 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2027 Qty Electronics Total Cost (Each) ($ M) P-35 Items Radio Communication System (RCS) TURNKEY 2 17.826 Consolidated Afloat Networks and Enterprise Services (CANES) 2 17.366 P-35 Items Subtotal 35.192 Major Items Digital Modular Radio (DMR) 6 Commercial Broadband Satellite Program (CBSP) 2 8.880 AN/SLQ-25 NIXIE 2 13.186 AN/USQ-155 Tactical Variant Switch (TVS) 2 3.076 OA-9277A 2 4.064 Battle Force Tactical Network (BFTN)/BFTN Resilient Command and Control System Enhancement (BRSE) 2 Major Items Subtotal 9.814 3.254 42.274 Other Cost Elements Minor Systems 2 21.222 Other Cost Elements Subtotal 21.222 Total Electronics 98.688 LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 7 of 10 P-1 Line #28 Volume 1 - 365 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler FY 2027 Qty Hull, Mechanical, and Electrical (HM&E) Total Cost (Each) ($ M) Major Items Engineering Services 2 20.990 Logistics Support Services 2 3.670 SOLAS Variant RIB (Qty 2 per ship) 4 2.268 Material Handling Equipment 2 2.228 Shipboard Automated Maintenance Module (SAMM) 2 1.008 Improved Point Detection System - Lifecycle Replacement (IPDS-LR) 2 1.186 MIL-SPEC Aqueous Film Forming Foam (AFFF) procurement 2 1.608 UNREP E-Stream 2.0 Non-Recurring Engineering (NRE) 1 1.700 Major Items Subtotal 34.658 Total Hull, Mechanical, and Electrical (HM&E) 34.658 Remarks: Due to commercial AFFF obsolescence the program will procure MIL-SPEC AFFF beginning on the FY 2020 and follow ships. Due to UNREP E-Stream 1.0 obsolescence the program funded E-Stream 2.0 NRE beginning on FY 2020 and following ships. LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 8 of 10 P-1 Line #28 Volume 1 - 366 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: Radio Communication System (RCS) TURNKEY PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 3.120 Ancillary Equipment 0.356 Technical Engineering Services 5.440 Ship Installation 7.730 Program Management 1.180 Total 2 17.826 Description: The Radio Communication System (RCS) consists of the subsystems that provide data and voice communications across the Radio Frequency (RF) spectrum. The RCS will be comprised of subsystems provided from various sources, including NAVWAR Program of Record systems, commercial systems, and associated ancillary equipment that can be obtained through the stock system and bought commercially. These subsystems will be integrated into one system and will include the automated and manual patching equipment required to configure these subsystems. The subsystems included in the RCS include the High Frequency System, Digital Modular Radio (DMR) VHF/UHF Line of Sight and UHF SATCOM voice, Naval Modular Automated Communications System (NAVMACS), Battle Force Tactical Network Resilient Command and Control System Enhancement (BRSE), Navy Consolidated Afloat Networks and Enterprise Services (CANES), Tactical Variant Switch (TVS), Tactical Voice Terminal (TVT), Advanced Digital Networks System (ADNS), Commercial Broadband Satellite Program (CBSP), Fleet Broadcast System, Navy Order wire (NOW) Terminals, OE-570D/WSC UHF SATCOM Antenna, Portable Communications Equipment and Cryptologic equipment. The subsystems are integrated by NIWC LANT at the C4I- Ship Integration Facility (C-SIF) with the proper interfaces to operate as an overall system. The RCS subsystems and interfaces will be tested prior to shipment for installation onboard the T-AO ships. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 T-AO 218 TBD TBD TBD New/Option Quantity Unit Cost 2 1.560 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2027 T-AO 218 Sep 2031 7 14 Dec 2029 Competition/Second Source Initiatives: N/A Remarks: FY 2027 includes T-AO 218 and T-AO 219 LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 9 of 10 P-1 Line #28 Volume 1 - 367 === page 418 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5025 / TAO Fleet Oiler Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: Consolidated Afloat Networks and Enterprise Services (CANES) PARM Code: N/A FY 2027 Qty P-35 Category Total Cost (Each) ($ M) Major Hardware 2 7.672 System Engineering - Technical Engineering Services 3.162 Software 3.122 Ship Installation 1.402 Program Management 0.888 Integrated Logistics Support and Data 1.120 Total 2 17.366 Description: Consolidated Afloat Networks and Enterprise Services (CANES) is an on-board network classified and unclassified infrastructure that leverages the next generation of Afloat Navy Networks computing and services infrastructure. The system delivers required support to MSC communications and network infrastructure capabilities of the Combat Logistics Force Platforms. Contract Data: Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2027 T-AO 218 TBD TBD TBD New/Option Quantity Unit Cost 2 3.836 (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime Required Award Date FY 2027 T-AO 218 Sep 2031 8 24 Jan 2029 Competition/Second Source Initiatives: N/A Remarks: FY 2027 includes T-AO 218 and T-AO 219 LI 5025 - TAO Fleet Oiler Navy UNCLASSIFIED Page 10 of 10 P-1 Line #28 Volume 1 - 368 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Subsequent Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1 789.550 - 0.000 FY 2027 Base FY 2026 FY 2027 OOC 1 1 612.205 610.664 FY 2027 Total 0.000 FY 2028 FY 2029 To FY 2031 Complete FY 2030 1 1 1 1 1 610.664 594.364 601.000 569.728 579.492 150.655 - - - - - - - - - - 513.466 - - - - - - - - - - 276.084 0.000 513.466 - 789.550 - 789.550 0.000 612.205 612.205 612.205 610.664 610.664 610.664 0.000 0.000 610.664 610.664 610.664 594.364 594.364 594.364 601.000 601.000 601.000 569.728 569.728 569.728 579.492 579.492 579.492 Total - 150.655 150.655 7 4,507.658 513.466 3,994.192 513.466 4,507.658 150.655 4,507.658 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 26.678 19.353 16.865 17.207 57.367 137.470 Total ($ in Millions) 789.550 - - 612.205 - 610.664 - - 610.664 - 621.042 620.353 586.593 596.699 208.022 4,645.128 Gross/Weapon System Unit Cost ($ in Millions) 789.550 - 612.205 610.664 - 610.664 594.364 601.000 569.728 579.492 - 643.951 Description: Auxiliary General Ocean Surveillance (T-AGOS) ships gather underwater acoustical data to support the mission of the Integrated Undersea Surveillance System (IUSS) by providing a ship platform capable of theater anti-submarine acoustic passive and active surveillance. T-AGOS ships are operated by Military Sealift Command to support the anti-submarine warfare mission of the commanders of the Atlantic and Pacific Fleets. The two current classes of surveillance ships use Surveillance Towed-Array Sensor System (SURTASS) equipment to gather undersea acoustic data. The ships also carry electronic equipment to process and transmit that data via satellite to shore stations for evaluation. Funding will support recapitalization of the four Small Waterplane Area Twin Hull (SWATH) T-19 Class and one SWATH T-23 Class ships. The FY 2027 request for TAGOs includes $610,664 thousand and quantity of 1 of discretionary and $100,000 thousand and quantity of 0 of mandatory for a total of $710,664 and quantity of 1. The mandatory funds will be used to enhance the U.S. surface maritime industrial base productivity in various areas including supplier development, shipyard infrastructure, strategic sourcing, workforce development, technology opportunities, and wages. LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 1 of 7 P-1 Line #31 Volume 1 - 369 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft T-AGOS 25 (Notional) 359 ft 104 ft 8901 Long Tons Full Load 29 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date T-AGOS 25 T-AGOS 26 T-AGOS 27 98 months 51 months Jul 2031 Mar 2032 Feb 2033 69 months 50 months Mar 2032 Nov 2032 Oct 2033 72 months 49 months Feb 2033 Oct 2033 Sep 2034 May 2023 Jun 2026 Feb 2027 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Reissue Reissue Complete / Response Issue Date for TLS N/A N/A Preliminary Design Mar 2019 Jun 2020 N/A N/A Contract Design Detail Design Jun 2020 Jun 2021 N/A N/A May 2023 Jan 2026 N/A Request for Proposals N/A Nov 2021 May 2022 N/A Jan 2023 Design Agent Classification of Cost Estimate: LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 2 of 7 P-1 Line #31 Volume 1 - 370 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 (†) Cost Categories indicates the presence of a P-8a Plan Costs FY 2022 Qty (Each) Change Orders Qty ($ M) 1 Basic Construction/Conversion FY 2026 Total Cost (Each) 113.906 528.974 FY 2027 Total Cost Qty ($ M) Total Cost (Each) 1 460.560 ($ M) 1 433.665 11.470 13.662 12.964 105.000 115.983 142.500 30.200 22.000 21.535 Total Ship Estimate 789.550 612.205 610.664 Less Subsequent Full Funding FY 2024 513.466 Net P-1 Funding 276.084 Electronics (†) Hull, Mechanical, and Electrical (HM&E) Other Cost 612.205 610.664 Remarks: 1) Plan Costs reflects $113.9 million of FY 2022 obligated for lead ship's Non-Recurring Engineering (NRE)/Detail Design with Austal USA. Contract included lead ship's Detail Design and Construction (DD&C) option exercised May 2024 to continue ongoing Detail Design related efforts. 2) The FY2024 budget rescinded $158.3 million from FY2022 and added $513.5 million to FY2024 for a net add of $355.2 million for the Lead Hull. LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 3 of 7 P-1 Line #31 Volume 1 - 371 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction T-AGOS 25 Austal USA 2022 May 2023 Apr 2027 Jul 2031 T-AGOS 26 Austal USA 2026 Jun 2026 Jan 2028 Mar 2032 T-AGOS 27 Austal USA 2027 Feb 2027 Jan 2029 Feb 2033 T-AGOS 28 Austal USA 2028 Feb 2028 Jan 2030 Jan 2034 T-AGOS 29 Austal USA 2029 Feb 2029 Jan 2031 Jan 2035 T-AGOS 30 Austal USA 2030 Feb 2030 Jan 2032 Jan 2036 T-AGOS 31 Austal USA 2031 Feb 2031 Jan 2033 Jan 2037 LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 4 of 7 P-1 Line #31 Delivery Date Volume 1 - 372 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2026 Electronics Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) P-35 Items Command, Control, Communications, Computers and Intelligence (C4I) 1 26.468 2 30.800 Surveillance Towed Array Sensor System (SURTASS) 4 89.515 4 111.700 P-35 Items Subtotal 115.983 142.500 Total Electronics 115.983 142.500 Remarks: The FY 2026 Electronics SURTASS Government Furnished Equipment (GFE) costs have been updated to reflect current procurement estimates for both program of record GFE and T-AGOS 25 Class specific interfaces. GFE cost increases are the result of new contract prices, government labor increases, and estimates based on the latest inflation indices. LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 5 of 7 P-1 Line #31 Volume 1 - 373 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: Command, Control, Communications, Computers and Intelligence (C4I) PARM Code: N/A FY 2026 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 14.022 Ancillary Equipment Total Cost (Each) ($ M) 1 15.490 7.792 System Engineering 0 10.160 1.774 Other Costs 1 1.960 2 30.800 2.880 Total 1 3.190 26.468 Description: The C4I includes Global Command & Control system - Maritime (GCCS-M) via Consolidated Afloat Networks and Enterprise Services (CANES), Global Positioning Navigation and Timing Service (GPNTS), Automatic Identification System AN/URN-31(V)1/(V)2, Identification Friend or Foe (IFF) AN/APX-123(V)3, Commercial Broadband Satellite Program (CBSP), Digital Modular Radio (DMR) UHF Line of Site and UHF SATCOM, Command and Control Office Information Exchange (C2OIX), Tactical Variant Switch, SI and HF communications, Consolidated Afloat Networks and Enterprise Services (CANES), and Advanced Digital Networks System (ADNS). Contract Data: Quantity Unit Cost Various 1 14.022 Various 1 15.490 Program Year Hull Prime Contractor Contract Method/Type Award Date New/Option FY 2026 T-AGOS 26 Various Various Various FY 2027 T-AGOS 27 Various Various Various (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2026 T-AGOS 26 Mar 2032 12 32 Required Award Date Jul 2028 FY 2027 T-AGOS 27 Feb 2033 12 32 Jun 2029 Competition/Second Source Initiatives: N/A Remarks: The FY 2027 Electronics C4I Government Furnished Equipment (GFE) auxiliary equipment funding exceeds standard escalation due to alignment with updated vendor pricing for electronics and supplier quotes for auxiliaries. Key drivers include parts obsolescence, cybersecurity (Risk Management Framework), EMI/EMC testing, shock qualification, quality assurance, material surcharges, and higher integration and acceptance costs. LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 6 of 7 P-1 Line #31 Volume 1 - 374 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-35, Major Ship Component Fact Sheet: PB 2027 Navy P-1 Line Item Number / Title: 5030 / TAGOS Surtass Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Equipment Item: Surveillance Towed Array Sensor System (SURTASS) PARM Code: N/A FY 2026 FY 2027 Qty P-35 Category Total Cost (Each) Major Hardware Qty ($ M) 1 Total Cost (Each) 38.145 Ancillary Equipment 3.990 System Engineering 5.271 ($ M) 1 47.420 5.050 6.550 Active Array 1 24.628 1 30.560 Active Handling System 1 11.656 1 14.750 Passive Handling System 1 5.825 1 7.370 Total 4 89.515 4 111.700 Description: The SURTASS mission system is a Navy Acquisition Program of Record and T-AGOS is the host platform for the Surveillance Towed Array Sensor System (SURTASS). SURTASS is comprised of active and passive acoustic arrays, a processing segment, and a command, control, communications, computer, combat systems, and intelligence (C5I) segment to deliver tactical mission data to fleet and intelligence community users. SURTASS mission system will be procured to outfit the T-AGOS 25 Class. Contract Data: Quantity Unit Cost Various 1 38.145 Various 1 47.420 Program Year Hull Prime Contractor Contract Method/Type Award Date FY 2026 T-AGOS 26 Various TBD FY 2027 T-AGOS 27 Various TBD New/Option (Each) ($ M) Delivery Date: Program Year Hull Earliest Ship Delivery Date Months Required Before Delivery Production Leadtime FY 2026 T-AGOS 26 Mar 2032 12 32 Required Award Date Jul 2028 FY 2027 T-AGOS 27 Feb 2033 12 32 Jun 2029 Competition/Second Source Initiatives: N/A Remarks: The FY 2027 Electronics SURTASS Government Furnished Equipment (GFE) auxiliary equipment funding exceeds standard escalation due to alignment with updated vendor pricing for electronics and supplier quotes for auxiliaries. Key drivers include parts obsolescence, cybersecurity (Risk Management Framework), EMI/EMC testing, shock qualification, quality assurance, material surcharges, and higher integration and acceptance costs. LI 5030 - TAGOS Surtass Ships Navy UNCLASSIFIED Page 7 of 7 P-1 Line #31 Volume 1 - 375 === page 426 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 376 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5035 / Towing, Salvage, and Rescue Ship (ATS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Section 8121 Inflation Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Plus Cost To Complete ($ in Millions) Plus Section 8121 Inflation Funding ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 8 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 1,092.120 8 950.620 - 0.000 141.500 To FY 2031 Complete Total - - - - - - - - - - 128.273 - - - - - - - - - - 128.273 3.000 - - - - - - - - - - 3.000 819.347 0.000 960.847 141.500 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - - 45.686 82.587 - - - - - - - - - 128.273 3.000 - - - - - - - - - - 3.000 868.033 82.587 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 1,092.120 141.500 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 29.722 3.800 8.837 13.743 - 13.743 7.179 12.215 2.837 - 1.629 79.962 Total ($ in Millions) 897.755 86.387 150.337 13.743 - 13.743 7.179 12.215 2.837 - 1.629 1,172.082 Gross/Weapon System Unit Cost ($ in Millions) 118.828 - - - - - - - - - 136.515 - Description: The Navy requires ocean going towing, salvage, and rescue capabilities to support Fleet operations. The Navy's current capabilities are provided by four Fleet Ocean Tugs (T-ATF) 166 Class Fleet tugs and four Rescue and Salvage Ships (T-ARS 50) Class salvage ships which will reach the end of their expected service lives beginning in 2020 and 2025, respectively. The Towing, Salvage and Rescue Ships (T-ATS 6 Navajo Class) will recapitalize the current Fleet tugs and salvage ships with a common hull that is capable of performing the missions of the retiring T-ATF and T-ARS classes. The FY 2026 spend plan amount for T-ATS includes $141,500 thousand and quantity of 0 of discretionary and $500,000 thousand and quantity of 0 of mandatory funding for a total of $641,500 thousand and a quantity of 0. LI 5035 - Towing, Salvage, and Rescue Ship (ATS) Navy UNCLASSIFIED Page 1 of 5 P-1 Line #32 Volume 1 - 377 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 5035 / Towing, Salvage, and Rescue Ship (ATS) Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft T-ATS 263 ft 59 ft 5,110 tons 18 ft Production Status: (1) T-ATS 7 T-ATS 8 T-ATS 9 T-ATS 10 Mar 2018 Apr 2019 Apr 2019 Apr 2020 Apr 2020 105 months 90 months Dec 2026 Jan 2027 Dec 2027 98 months 92 months Jun 2027 Aug 2027 Jul 2028 112 months 102 months Aug 2028 Oct 2028 Sep 2029 108 months 80 months Apr 2029 May 2029 Apr 2030 114 months 79 months Oct 2029 Nov 2029 Oct 2030 Production Status: T-ATS 13 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Jul 2022 T-ATS 14 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date T-ATS 6 73 months 50 months Aug 2028 Sep 2028 Aug 2029 (3) Jul 2022 38 months 0 months Sep 2025 Sep 2025 Aug 2026 T-ATS 15 T-ATS 11 (2) T-ATS 12 Sep 2021 Sep 2021 57 months 47 months Jun 2026 Jul 2026 Jun 2027 68 months 52 months May 2027 Jun 2027 May 2028 (4) Jun 2023 27 months 0 months Sep 2025 Sep 2025 Aug 2026 Design Schedule Start / Issue Complete / Response Issue Date for TLR Dec 2015 Mar 2016 Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design Mar 2018 Sep 2019 Request for Proposals Mar 2017 May 2017 Design Agent Wartsila Reissue Reissue Complete / Response Classification of Cost Estimate: Footnotes: (1) T-ATS 6 through T-ATS 10 Delivery dates reflect historical performance with learning curve and planned manning growth at Bollinger. LI 5035 - Towing, Salvage, and Rescue Ship (ATS) Navy UNCLASSIFIED Page 2 of 5 P-1 Line #32 Volume 1 - 378 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5035 / Towing, Salvage, and Rescue Ship (ATS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (2) (3) (4) T-ATS 11 through T-ATS 13 Delivery dates reflect the Austal REA settlement. T-ATS 14 was descoped on September 30, 2025. Delivery date reflects descope date T-ATS 15 was descoped on September 30, 2025. Delivery date reflects descope date LI 5035 - Towing, Salvage, and Rescue Ship (ATS) Navy UNCLASSIFIED Page 3 of 5 P-1 Line #32 Volume 1 - 379 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5035 / Towing, Salvage, and Rescue Ship (ATS) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2016 Cost Categories Plan Costs Basic Construction/Conversion Qty FY 2018 Total Cost (Each) ($ M) Qty (Each) 1 FY 2019 Total Cost ($ M) 1 Qty FY 2020 Total Cost (Each) ($ M) Qty (Each) 1 FY 2021 Total Cost ($ M) 2 Qty FY 2022 Total Cost (Each) ($ M) 2 Qty FY 2023 Total Cost (Each) ($ M) 1 Qty Total Cost (Each) ($ M) 0 125.742 66.383 66.245 137.975 190.150 168.593 94.389 Change Orders 1.670 2.792 2.501 2.602 4.018 2.394 0.207 Electronics 6.121 5.779 5.547 11.300 11.241 7.016 0.516 Hull, Mechanical, and Electrical (HM&E) 3.217 3.935 8.628 3.533 7.292 10.031 0.803 136.750 78.889 82.921 155.410 212.701 188.034 95.915 Less Cost to Complete FY 2023 1.750 2.800 2.450 - 15.727 - - Less Cost to Complete FY 2024 - - - 1.150 21.809 - - Less Cost to Complete FY 2025 60.000 - - 0.978 17.375 4.234 - Total Ship Estimate Less Section 8121 Inflation Funding FY 2023 Net P-1 Funding - - - 3.000 75.000 76.089 80.471 150.282 LI 5035 - Towing, Salvage, and Rescue Ship (ATS) Navy UNCLASSIFIED Page 4 of 5 157.790 P-1 Line #32 183.800 95.915 Volume 1 - 380 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5035 / Towing, Salvage, and Rescue Ship (ATS) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date Bollinger Houma Shipyards 2016 Mar 2018 Jun 2019 Dec 2026 T-ATS 7 Bollinger Houma Shipyards 2018 Apr 2019 Oct 2019 Jun 2027 T-ATS 8 Bollinger Houma Shipyards 2019 Apr 2019 Feb 2020 Aug 2028 T-ATS 9 Bollinger Houma Shipyards 2020 Apr 2020 Aug 2022 Apr 2029 T-ATS 10 Bollinger Houma Shipyards 2020 Apr 2020 Mar 2023 Oct 2029 Austal USA 2021 Sep 2021 Jul 2022 Jun 2026 T-ATS 12 Austal USA 2021 Sep 2021 Jan 2023 May 2027 T-ATS 13 Austal USA 2022 Jul 2022 Jun 2024 Aug 2028 T-ATS 14 (3) Austal USA 2022 Jul 2022 Sep 2025 Sep 2025 T-ATS 15 (4) Austal USA 2023 Jun 2023 Sep 2025 Sep 2025 T-ATS 6 (1) T-ATS 11 (2) Footnotes: (1) (2) (3) (4) T-ATS 6 through T-ATS 10 Delivery dates reflect historical performance with learning curve and planned manning growth at Bollinger. T-ATS 11 through T-ATS 13 Delivery dates reflect the Austal REA settlement. T-ATS 14 was descoped on September 30, 2025. Delivery date reflects descope date T-ATS 15 was descoped on September 30, 2025. Delivery date reflects descope date LI 5035 - Towing, Salvage, and Rescue Ship (ATS) Navy UNCLASSIFIED Page 5 of 5 P-1 Line #32 Volume 1 - 381 === page 432 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 382 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5087 / Oceanographic Ships Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Section 8121 Inflation Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) 4 496.343 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 496.343 Total - - - - - - - - - - - - 24.015 - - - - - - - - - - 24.015 1.500 - - - - - - - - - - 1.500 470.828 470.828 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Plus Cost To Complete ($ in Millions) - 18.000 6.015 - - - - - - - - 24.015 1.500 - - - - - - - - - - 1.500 472.328 18.000 6.015 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 496.343 Plus Section 8121 Inflation Funding ($ in Millions) Total Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 14.862 1.750 8.150 1.944 - 1.944 - - - - - 26.706 Total ($ in Millions) 487.190 19.750 14.165 1.944 - 1.944 - - - - - 523.049 Gross/Weapon System Unit Cost ($ in Millions) 124.086 - - - - - - - - - - 124.086 Description: The FY 2018 Omnibus Appropriations Act included a Congressional add for Detail Design and Construction (DD&C) efforts for one T-AGS 60 vessel. T-AGS 67 is a repeat platform of T-AGS 66 and includes the Moon Pool Launch and Recovery System. The T-AGS 67 will be capable of deep ocean and coastal surveys, oceanographic sampling and data collections of surface, midwater and ocean floor parameters, shipboard oceanographic data processing and sample analysis, and operation of remotely operated vehicles and hydrographic survey launches. LI 5087 - Oceanographic Ships Navy UNCLASSIFIED Page 1 of 4 P-1 Line #33 Volume 1 - 383 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5087 / Oceanographic Ships Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft T-AGS 353 ft 58 ft 4,888 Long Tons 19 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date T-AGS 67 (1) Jun 2021 78 months 67 months Dec 2027 Mar 2028 Feb 2029 Design Schedule Start / Issue Complete / Response Issue Date for TLR Aug 1993 N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design Jun 2021 N/A Request for Proposals Aug 2018 N/A Design Agent N/A Reissue Reissue Complete / Response Classification of Cost Estimate: N/A Footnotes: (1) Undefinitized Contract Action (UCA) awarded in November 2018 with limited ship construction beginning in March 2019. DD&C contract awarded in June 2021. Bollinger Shipyards purchased VT Halter Marine Inc. in November 2022. The delivery delayed 12 months due to prioritization of other Navy programs and manpower challenges. LI 5087 - Oceanographic Ships Navy UNCLASSIFIED Page 2 of 4 P-1 Line #33 Volume 1 - 384 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5087 / Oceanographic Ships FY 2018 Qty Cost Categories Total Cost (Each) Plan Costs ($ M) 1 Basic Construction/Conversion 167.680 Change Orders 3.992 Electronics 22.899 Hull, Mechanical, and Electrical (HM&E) 10.576 Other Cost Total Ship Estimate 205.147 Less Cost to Complete FY 2025 18.000 Less Cost to Complete FY 2026 6.015 1.500 Less Section 8121 Inflation Funding FY 2023 Net P-1 Funding LI 5087 - Oceanographic Ships Navy 179.632 UNCLASSIFIED Page 3 of 4 P-1 Line #33 Volume 1 - 385 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5087 / Oceanographic Ships Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship T-AGS 67 (1) Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date Bollinger Mississippi Shipbuilding 2018 Jun 2021 May 2022 Dec 2027 Footnotes: (1) Undefinitized Contract Action (UCA) awarded in November 2018 with limited ship construction beginning in March 2019. DD&C contract awarded in June 2021. Bollinger Shipyards purchased VT Halter Marine Inc. in November 2022. The delivery delayed 12 months due to prioritization of other Navy programs and manpower challenges. LI 5087 - Oceanographic Ships Navy UNCLASSIFIED Page 4 of 4 P-1 Line #33 Volume 1 - 386 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5100 / LCU 1700 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) 5 381.627 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 20 25 801.550 1,183.177 - - - - - - - - - - - - Less Cost To Complete ($ in Millions) 11.816 - - - - - - - - - - 11.816 Net Procurement (P-1) ($ in Millions) 369.811 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - - Plus Cost To Complete ($ in Millions) 11.816 - - - - - - - - - - 11.816 Total Obligation Authority ($ in Millions) 381.627 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Plus CY Advance Procurement ($ in Millions) 801.550 801.550 1,171.361 1,183.177 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 9.648 7.954 9.654 1.025 - 1.025 - - - - Total ($ in Millions) 391.275 7.954 9.654 1.025 - 1.025 - - - - 801.550 - 1,211.458 28.281 Gross/Weapon System Unit Cost ($ in Millions) 76.325 - - - - - - - - - 40.078 47.327 Description: The LCU 1700 program provides heavy lift capability to transport personnel, weapons, equipment, and cargo from the ship to shore and shore to shore across the range of military operations (ROMO). LCU 1700 will be able to conduct 24 hours/day operations for up to 10 days for continuous landing of troops, equipment, and supplies; provide support for missions requiring persistence such as riverine sustainment, surveillance or port clearing; and execute missions to reinforce, reposition, and resupply forces over a wide operating area. LCU 1700 provides the functional replacement for the LCU 1610 class of landing craft, all of which have significantly exceeded their 25 year service life, the average age exceeds 50 years old. The initial Swiftships LLC contract was terminated for default in February 2024. No craft from the initial contract will be delivered. A Detail Design and Construction contract was awarded in September 2023 for three LCUs (LCU 1710-1712), with the option for LCUs 1713 and 1714 awarded in July 2024. The FY 2026 spend plan amount for LCU includes $0 thousand and quantity of 0 of discretionary and $295,000 thousand and quantity of 9 of mandatory funding for a total of $295,000 thousand and a quantity of 9. LI 5100 - LCU 1700 Navy UNCLASSIFIED Page 1 of 5 P-1 Line #34 Volume 1 - 387 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5100 / LCU 1700 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft LCU 139 ft 31 ft 428 Tons 7.3 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date (1) LCU 1711 LCU 1712 LCU 1713 LCU 1714 Sep 2023 Sep 2023 Sep 2023 Jul 2024 Jul 2024 32 months 25 months May 2026 Feb 2027 Jan 2028 38 months 23 months Nov 2026 Feb 2027 Jan 2028 42 months 23 months Mar 2027 Sep 2027 Aug 2028 35 months 18 months Jun 2027 Sep 2027 Aug 2028 36 months 15 months Jul 2027 Feb 2028 Jan 2029 LCU 1710 LCU 1717 Apr 2026 23 months 15 months Mar 2028 Jul 2028 Jun 2029 (4) LCU 1718 (5) Apr 2026 27 months 15 months Jul 2028 Mar 2029 Feb 2030 LCU 1719 (6) Apr 2026 LCU 1720 (7) LCU 1721 Apr 2026 31 months 15 months Nov 2028 Mar 2029 Feb 2030 Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Mar 2014 May 2015 Contract Design Jun 2015 Jun 2016 Detail Design Apr 2018 Jan 2022 Request for Proposals Feb 2017 May 2017 Design Agent Swiftships LLC (2) Apr 2026 (8) 39 months 15 months Jul 2029 Nov 2029 Oct 2030 Reissue LCU 1722 Mar 2027 30 months 24 months Sep 2029 Jun 2030 May 2031 LCU 1716 (3) Apr 2026 15 months 15 months Jul 2027 Aug 2027 Jul 2028 Apr 2026 35 months 15 months Mar 2029 Nov 2029 Oct 2030 Design Schedule LCU 1715 19 months 15 months Nov 2027 Jul 2028 Jun 2029 (9) LCU 1723 (10) Mar 2027 36 months 24 months Mar 2030 Jun 2030 May 2031 Reissue Complete / Response Classification of Cost Estimate: Footnotes: (1) The initial Design Agent was Swiftships LLC. With the award of LCU 1710, Austal USA became the Design Agent for LCUs 1710-1714. LI 5100 - LCU 1700 Navy UNCLASSIFIED Page 2 of 5 P-1 Line #34 Volume 1 - 388 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5100 / LCU 1700 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (2) (3) (4) (5) (6) (7) (8) (9) Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship (10) Reconciliation Ship LI 5100 - LCU 1700 Navy UNCLASSIFIED Page 3 of 5 P-1 Line #34 Volume 1 - 389 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5100 / LCU 1700 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2021 Cost Categories Plan Costs Qty FY 2022 Total Cost (Each) ($ M) 1 Qty FY 2024 Total Cost (Each) ($ M) 2 Qty FY 2026 Total Cost (Each) ($ M) 2 Qty Total Cost (Each) ($ M) 0 Basic Construction/Conversion 65.045 61.726 58.200 - Change Orders 1.875 2.263 1.500 - Electronics 5.681 0.362 0.300 - Hull, Mechanical, and Electrical (HM&E) 2.898 1.805 1.000 - Other Cost 11.896 1.772 1.532 - Total Ship Estimate 87.395 67.928 62.532 - Net P-1 Funding 87.395 67.928 62.532 - Remarks: The FY 2026 Total Ship Estimate does not show $295,000 thousand and quantity of nine funded in FY 2026 mandatory funding. LI 5100 - LCU 1700 Navy UNCLASSIFIED Page 4 of 5 P-1 Line #34 Volume 1 - 390 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5100 / LCU 1700 Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date Austal USA 2021 Sep 2023 Apr 2024 May 2026 LCU 1711 Austal USA 2022 Sep 2023 Dec 2024 Nov 2026 LCU 1712 Austal USA 2022 Sep 2023 Apr 2025 Mar 2027 LCU 1713 Austal USA 2024 Jul 2024 Dec 2025 Jun 2027 LCU 1714 Austal USA 2024 Jul 2024 Apr 2026 Jul 2027 LCU 1715 (2) Austal USA 2026 Apr 2026 Apr 2026 Jul 2027 LCU 1716 (3) Austal USA 2026 Apr 2026 Aug 2026 Nov 2027 LCU 1717 (4) Austal USA 2026 Apr 2026 Dec 2026 Mar 2028 LCU 1718 (5) Austal USA 2026 Apr 2026 Apr 2027 Jul 2028 LCU 1719 (6) Austal USA 2026 Apr 2026 Aug 2027 Nov 2028 LCU 1720 (7) Austal USA 2026 Apr 2026 Dec 2027 Mar 2029 LCU 1721 (8) Austal USA 2026 Apr 2026 Apr 2028 Jul 2029 LCU 1722 (9) Austal USA 2026 Mar 2027 Sep 2027 Sep 2029 (10) Austal USA 2026 Mar 2027 Mar 2028 Mar 2030 LCU 1710 LCU 1723 (1) Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) The initial Design Agent was Swiftships LLC. With the award of LCU 1710, Austal USA became the Design Agent for LCUs 1710-1714. Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship Reconciliation Ship (10) Reconciliation Ship LI 5100 - LCU 1700 Navy UNCLASSIFIED Page 5 of 5 P-1 Line #34 Volume 1 - 391 === page 442 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 392 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5104 / Strategic Sealift Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Prior Years FY 2025 FY 2026 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC 1 450.000 0.000 FY 2029 1 1 450.000 350.000 5 10 350.000 700.000 1,750.000 3,600.000 0.000 450.000 0.000 450.000 350.000 0.000 350.000 700.000 1,750.000 3,600.000 Full Funding TOA ($ in Millions) - - - 450.000 - 450.000 350.000 - 350.000 700.000 1,750.000 3,600.000 Plus CY Advance Procurement ($ in Millions) - - - 0.000 0.000 0.000 Total Obligation Authority ($ in Millions) 450.000 0.000 450.000 350.000 - 2 - - - Total 1 0.000 - - 0.000 To FY 2031 Complete FY 2030 - - - FY 2028 0.000 Net Procurement (P-1) ($ in Millions) - FY 2027 Total 0.000 - - - - - - - - 350.000 700.000 1,750.000 3,600.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) - - - 450.000 - 450.000 350.000 - 350.000 700.000 1,750.000 3,600.000 Gross/Weapon System Unit Cost ($ in Millions) - - - 450.000 - 450.000 350.000 - 350.000 350.000 350.000 360.000 Description: This funding is required to recapitalize the U.S. surge sealift fleet. The principal enabler for recapitalizing the U.S. surge sealift fleet is through a blend of new construction and procurement of used commercial vessels via the Ready Reserve Force (RRF) Recapitalization program. Strategic sealift is a key enabler of U.S. power projection and supports the afloat movement of equipment and supplies for major ground combat operations. During surge deployments, approximately 90% of Marine Corps and Army combat equipment is transported by sea, under the operation of U.S. Transportation Command (USTRANSCOM). The RRF, managed by the U.S. Department of Transportation's (DOT) Maritime Administration (MARAD) is the primary force of the surge sealift fleet. As a key element of strategic sealift, the RRF is specifically structured to transport military unit equipment and supplies during the initial surge of U.S. combat forces deploying anywhere in the world. This fleet consists of 43 government-owned ships with an average age of 41 years; a majority of these ships have already exceeded their expected service life, limiting their supportability and adding significant risk to their operational readiness. As a result, the Joint Force requires 18 ships over the next 5 years to replace anticipated sealift capacity losses. MARAD new construction utilizes a Vessel Construction Manager (VCM). This structure had proven effective in both cost and timing. The Department of the Navy intends to explore foreign shipbuilding opportunities for the FY27 and FY28 ships. The FY 2026 spend plan for Strategic Sealift includes $0 of discretionary and quantity of 0 and $600,000 thousand and quantity of 1 of mandatory (reconciliation) for a total of $600,000 thousand and quantity of 1. LI 5104 - Strategic Sealift Navy UNCLASSIFIED Page 1 of 4 P-1 Line #35 Volume 1 - 393 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5104 / Strategic Sealift Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft - Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date SLFT 1 (1) SLFT 2 Sep 2026 Sep 2027 48 months 48 months Sep 2030 48 months 48 months Sep 2031 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Justification: The FY 2027 request is for $450,000 thousand and one new Strategic Sealift. Footnotes: (1) Reconciliation Ship LI 5104 - Strategic Sealift Navy UNCLASSIFIED Page 2 of 4 P-1 Line #35 Volume 1 - 394 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5104 / Strategic Sealift Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2026 Cost Categories Plan Costs Qty FY 2027 Total Cost (Each) Qty ($ M) 0 Basic Construction/Conversion Total Cost (Each) ($ M) 1 - 450.000 Total Ship Estimate - 450.000 Net P-1 Funding - 450.000 Change Orders Electronics Technology Insertion Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance Remarks: The FY 2026 Total Ship Estimate does not show $600,000 thousand and quantity of 1 funded in FY 2026 mandatory funding. LI 5104 - Strategic Sealift Navy UNCLASSIFIED Page 3 of 4 P-1 Line #35 Volume 1 - 395 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5104 / Strategic Sealift Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date TBD 2026 Sep 2026 Sep 2026 Sep 2030 SLFT 2 TBD 2027 Sep 2027 Sep 2027 Sep 2031 SLFT 3 TBD 2028 Sep 2028 Sep 2028 Sep 2032 SLFT 4 TBD 2030 Sep 2030 Sep 2030 Sep 2034 SLFT 5 TBD 2031 Sep 2031 Sep 2031 Sep 2035 SLFT 6 TBD 2031 Feb 2032 Feb 2032 Feb 2036 SLFT 1 (1) Footnotes: (1) Reconciliation Ship LI 5104 - Strategic Sealift Navy UNCLASSIFIED Page 4 of 4 P-1 Line #35 Volume 1 - 396 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5110 / Outfitting Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Full Funding TOA - Outfitting ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total 1,010.689 217.061 294.495 243.591 428.616 483.349 430.379 446.319 1,823.499 5,377.998 Full Funding TOA - Post Delivery ($ in Millions) 654.157 362.130 586.204 485.418 342.021 543.941 444.996 623.714 4,421.532 8,464.113 Full Funding TOA - First Destination ($ in Millions) 69.014 6.776 6.147 12.261 6.417 6.551 6.689 6.825 6.589 127.269 1,733.860 585.967 886.846 741.270 777.054 1,033.841 882.064 1,076.858 6,251.620 13,969.380 Total Obligation Authority ($ in Millions) Description: Outfitting (OF) funds are used to acquire on board repair parts, other secondary items, equipage, recreation items, precommissioning crew support and general use consumables furnished to the shipbuilder or the fitting-out activity to fill the ship's initial allowances as defined by the baseline coordinated shipboard allowance list (COSAL). The program also budgets for contractor-furnished spares, a lead-time away from delivery. The program ensures operational readiness of ships undergoing new construction, conversion, service life extension program (SLEP), and nuclear refueling. It ensures these ships receive their full allowances of spare parts and equipment which are vitally required to support the shipboard maintenance process; ensures ships are equipped with operating space items (tools, test equipment, damage control), personnel safety and survivability commodities for successful completion of builder sea trials; supports shipboard maintenance and thereby achieving the OPNAV-directed supply readiness goals for material on board ship at delivery. SCN funding for the initial fill of allowance list items are limited to those items on the COSAL and authorized requirements through the Obligation Work Limiting Date (OWLD). While most outfitting funds are executed prior to ships' completion of fitting out dates, some outfitting funding may be required in the fiscal year following the scheduled Delivery Date. Post Delivery (PD) funding covers the repair of government-responsible items which were believed to have been complete to standard and/or operable at delivery, as well as funding to conduct tests and trials after delivery. It is essential to deliver to the Fleet complete ships, free from both contractor and government responsible deficiencies, capable of supporting the Navy's mission. The Post Shakedown Availability (PSA) is a shipyard availability assigned to commence after delivery and to be completed prior to the expiration of the SCN OWLD. It is during this time that acceptance and final contract trials deficiencies will be corrected. The purpose of the PSA is to correct new construction deficiencies found during the shakedown period; to correct contractor and government responsible deficiencies previously authorized; and accomplishment of other improvements or class items as authorized. Funding is used for corrections authorized by the ship's Program Manager as a result of builders' trials (pre-delivery), acceptance or underway trials, final contract trials, trial board items, and correction of production-related defects or deficiencies which develop during the post delivery period. Although the majority of post delivery funding occurs after ships' delivery dates, some funding is required prior to the delivery date in preparation for post delivery events. First Destination Transportation (FDT). FDT delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of War (DoW) supply system or a DoW activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navy-owned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification. Justification: In FY 2027, First Destination Transportation (FDT) has an increase of $6M specifically; $2M for APL 73 (LI 5114) and $4M for LCU 1713/1714. LI 5110 - Outfitting Navy UNCLASSIFIED Page 1 of 13 P-1 Line #36 Volume 1 - 397 === page 448 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date CO CLASS 826 2021 Oct 2020 Oct 2020 Mar 2029 Mar 2029 Jan 2029 Jul 2029 Aug 2030 10.742 17.175 34.834 2.297 3.370 68.418 CO CLASS 827 2024 Oct 2020 Sep 2023 Apr 2030 Apr 2030 Jan 2031 Jul 2031 Jun 2032 - - 12.153 14.634 53.199 79.986 CO CLASS 828 2026 May 2026 Apr 2025 Aug 2031 Aug 2031 May 2032 Nov 2032 Sep 2033 - - - 8.318 72.070 80.388 CO CLASS 829 2027 May 2026 Jun 2026 Sep 2032 Sep 2032 Jun 2033 Dec 2033 Oct 2034 - - - - 88.205 88.205 CO CLASS 830 2028 May 2026 Jun 2027 Aug 2033 Aug 2033 Apr 2034 Sep 2034 Aug 2035 - - - - 111.061 111.061 CO CLASS 831 2029 May 2026 Jun 2028 Jul 2034 Jul 2034 Mar 2035 Aug 2035 Jul 2036 - - - - 104.111 104.111 CO CLASS 832 2030 May 2026 Jun 2029 Jun 2035 Jun 2035 Feb 2036 Jul 2036 Jun 2037 - - - - 95.169 95.169 CO CLASS Total 10.742 17.175 46.987 25.249 527.185 627.338 191.494 57.436 31.600 8.600 - 36.751 41.299 234.600 312.650 57.436 68.351 49.899 234.600 601.780 - - - - 329.823 329.823 - - - - 329.823 329.823 Ship Class CVN 79 2013 Jun 2015 Feb 2011 Mar 2027 Jul 2027 Jul 2027 Sep 2027 Jun 2028 CVN 80 2018 Jan 2019 Jan 2019 Mar 2031 Oct 2031 Nov 2031 Jan 2032 Sep 2032 CVN Total CVN 81 2020 Jan 2019 Jan 2019 Feb 2034 Sep 2034 Oct 2034 Dec 2034 Aug 2035 CVN Total Prior Years FY 2025 191.494 FY 2026 FY 2027 To Complete - Total 289.130 VIRGINIA 793 2014 Apr 2014 Sep 2014 Feb 2022 Feb 2022 Aug 2023 Mar 2025 May 2025 20.262 - - - - 20.262 VIRGINIA 794 2015 Apr 2014 Apr 2015 Mar 2022 Mar 2022 Jan 2023 Nov 2024 Jan 2025 19.501 - - - - 19.501 VIRGINIA 795 2015 Apr 2014 Sep 2015 Oct 2023 Oct 2023 Mar 2025 Feb 2026 Apr 2026 18.354 - - - - 18.354 VIRGINIA 796 2016 Apr 2014 Mar 2016 Apr 2024 Apr 2024 Mar 2025 Mar 2026 May 2026 20.018 - - - - 20.018 VIRGINIA 797 2016 Apr 2014 Sep 2016 Dec 2024 Dec 2024 Apr 2026 Oct 2026 Dec 2026 20.507 - - - - 20.507 VIRGINIA 798 2017 Apr 2014 Mar 2017 Nov 2025 Nov 2025 Aug 2026 Nov 2026 Jan 2027 19.997 0.355 - - - 20.352 VIRGINIA 799 2017 Apr 2014 Sep 2017 Dec 2025 Dec 2025 Oct 2026 Sep 2027 Nov 2027 20.425 0.626 0.025 - - 21.076 VIRGINIA 800 2018 Apr 2014 Mar 2018 Dec 2026 Dec 2026 May 2027 Aug 2027 Nov 2027 21.765 0.961 0.915 - - 23.641 VIRGINIA 801 2018 Apr 2014 Sep 2018 May 2027 May 2027 Oct 2027 Jan 2028 Apr 2028 27.980 0.566 2.265 0.140 - 30.951 VIRGINIA 802 2019 Dec 2019 Sep 2019 Sep 2028 Sep 2028 Feb 2029 May 2029 Aug 2029 - 0.157 21.732 2.300 3.042 27.231 VIRGINIA 803 2019 Dec 2019 Mar 2020 Jul 2029 Jul 2029 Mar 2030 Nov 2030 Jan 2031 - 0.031 - 30.651 5.260 35.942 VIRGINIA 804 2020 Dec 2019 Sep 2020 Jun 2030 Jun 2030 Nov 2030 Jul 2031 Sep 2031 - - - - 37.354 37.354 VIRGINIA 805 2020 Dec 2019 May 2021 Sep 2030 Sep 2030 Feb 2031 Oct 2031 Dec 2031 - - - - 37.931 37.931 VIRGINIA 806 2021 Dec 2019 Aug 2022 Apr 2031 Apr 2031 Aug 2031 Apr 2032 Jun 2032 - - - - 38.782 38.782 VIRGINIA 807 2021 Dec 2019 Nov 2022 Jan 2032 Jan 2032 May 2032 Jan 2033 Mar 2033 - - - - 38.513 38.513 VIRGINIA 808 2022 Dec 2019 Aug 2023 Nov 2031 Nov 2031 May 2032 Nov 2032 Jan 2033 - - - - 39.463 39.463 VIRGINIA 809 2022 Dec 2019 Dec 2023 Jul 2032 Jul 2032 Jan 2033 Jul 2033 Sep 2033 - - - - 40.014 40.014 VIRGINIA 810 2023 Dec 2019 May 2024 Nov 2032 Nov 2032 Apr 2033 Oct 2033 Dec 2033 - - - - 40.419 40.419 VIRGINIA 811 2023 Dec 2019 Nov 2024 Apr 2033 Apr 2033 Aug 2033 Mar 2034 May 2034 - - - - 41.115 41.115 VIRGINIA 813 2024 Apr 2025 May 2025 Jan 2034 Jan 2034 May 2034 Nov 2034 Jan 2035 - - - - 45.371 45.371 VIRGINIA 812 2024 Apr 2025 Jan 2026 Dec 2034 Dec 2034 Apr 2035 Oct 2035 Dec 2035 - - - - 51.797 51.797 VIRGINIA 814 2025 May 2026 Sep 2026 Apr 2035 Apr 2035 Jul 2035 Jan 2036 Mar 2036 - - - - 46.278 46.278 VIRGINIA 815 2026 May 2026 Mar 2027 Sep 2035 Sep 2035 Feb 2036 Aug 2036 Oct 2036 - - - - 46.278 46.278 VIRGINIA 816 2026 May 2026 Sep 2027 Feb 2036 Feb 2036 Jun 2036 Dec 2036 Feb 2037 - - - - 46.278 46.278 VIRGINIA 817 2027 May 2026 Mar 2028 Jul 2036 Jul 2036 Oct 2036 May 2037 Jul 2037 - - - - 46.278 46.278 2.696 24.937 33.091 604.173 853.706 VIRGINIA Total LI 5110 - Outfitting Navy UNCLASSIFIED Page 2 of 13 188.809 P-1 Line #36 Volume 1 - 398 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date CVN-RCOH 73 2016 Aug 2017 Aug 2017 May 2023 Jul 2023 May 2023 May 2024 Jun 2024 CVN-RCOH 74 2020 Jan 2021 May 2021 Apr 2028 Jul 2028 Aug 2028 May 2029 CVN-RCOH 75 2025 Sep 2026 Sep 2026 Nov 2031 Jan 2032 Feb 2032 Aug 2032 Ship Class FY 2025 FY 2026 FY 2027 To Complete 69.998 - - - - 69.998 Jun 2029 39.062 6.660 11.000 12.862 0.758 70.342 Dec 2032 - - 1.200 7.546 82.098 90.844 109.060 6.660 12.200 20.408 82.856 231.184 32.311 CVN-RCOH Total DDG 1000 1002 2009 DDG 122 2015 DDG 124 2016 DDG 127 2016 DDG 126 2017 DDG 128 DDG Sep 2011 Apr 2028 Sep 2028 Apr 2029 Jun 2025 Jul 2029 Oct 2025 Total Aug 2029 32.305 - 0.006 - - DDG 1000 Total 32.305 - 0.006 - - 32.311 Oct 2025 25.605 0.337 - - - 25.942 Sep 2017 Jul 2024 Nov 2024 Jun 2013 Jul 2018 Nov 2025 Mar 2026 Oct 2026 Feb 2027 Feb 2027 25.971 1.563 0.703 - - 28.237 Sep 2017 Apr 2019 Sep 2026 Jan 2027 Sep 2027 Dec 2027 Dec 2027 20.996 5.432 0.971 0.132 - 27.531 Jun 2013 Mar 2020 Sep 2027 Jan 2028 Sep 2028 Dec 2028 Dec 2028 0.600 21.676 5.077 2.234 0.468 30.055 2018 Sep 2018 Apr 2020 Dec 2025 May 2026 May 2027 Sep 2027 Oct 2027 22.158 5.268 0.560 0.034 - 28.020 129 2018 Sep 2018 Jan 2021 Aug 2027 Dec 2027 Jul 2028 Nov 2028 Nov 2028 - 16.574 10.336 1.911 1.532 30.353 DDG 131 2019 Sep 2018 Nov 2021 Nov 2028 Mar 2029 Oct 2029 Feb 2030 Feb 2030 - 2.563 20.212 4.226 6.169 33.170 DDG 130 2019 Sep 2018 May 2021 Nov 2028 Mar 2029 Nov 2029 Feb 2030 Feb 2030 - - 23.114 4.738 5.366 33.218 DDG 132 2019 Dec 2018 Feb 2022 Sep 2029 Jan 2030 Sep 2030 Dec 2030 Dec 2030 - - - 10.348 23.424 33.772 DDG 133 2020 Sep 2018 Dec 2022 Feb 2030 Jun 2030 Jan 2031 May 2031 May 2031 - - 6.678 7.616 19.046 33.340 DDG 134 2020 Sep 2018 Nov 2023 Oct 2030 Feb 2031 Oct 2031 Jan 2032 Jan 2032 - - - - 33.930 33.930 DDG 135 2020 Jun 2020 Nov 2023 Feb 2031 Jun 2031 Jan 2032 May 2032 May 2032 - - - - 33.799 33.799 DDG 136 2021 Sep 2018 Apr 2024 Jun 2031 Oct 2031 May 2032 Sep 2032 Oct 2032 - - - - 34.374 34.374 DDG 137 2021 Sep 2018 Mar 2026 Feb 2032 Jun 2032 Jan 2033 May 2033 May 2033 - - - - 34.304 34.304 DDG 138 2022 Sep 2018 Mar 2025 Oct 2032 Feb 2033 Sep 2033 Jan 2034 Jan 2034 - - - - 34.351 34.351 DDG 139 2022 Sep 2018 Sep 2027 Aug 2033 Nov 2033 Jul 2034 Oct 2034 Oct 2034 - - - - 34.532 34.532 DDG 140 2023 Aug 2023 Jul 2026 Dec 2033 Apr 2034 Nov 2034 Mar 2035 Mar 2035 - - - - 35.066 35.066 DDG 141 2023 Aug 2023 Sep 2028 Aug 2034 Dec 2034 Aug 2035 Nov 2035 Nov 2035 - - - - 35.061 35.061 DDG 142 2023 Aug 2023 Sep 2029 Aug 2035 Dec 2035 Aug 2036 Nov 2036 Nov 2036 - - - - 35.558 35.558 DDG 144 2024 Aug 2023 Aug 2027 Jan 2035 May 2035 Dec 2035 Mar 2036 Apr 2036 - - - - 35.727 35.727 DDG 143 2024 Aug 2023 Sep 2030 Aug 2036 Dec 2036 Aug 2037 Nov 2037 Nov 2037 - - - - 35.563 35.563 DDG 148 2025 Jul 2025 Aug 2028 Nov 2035 Mar 2036 Oct 2036 Jan 2037 Feb 2037 - - - - 36.628 36.628 DDG 145 2025 Aug 2023 Sep 2031 Aug 2037 Dec 2037 Aug 2038 Nov 2038 Nov 2038 - - - - 35.721 35.721 DDG 146 2025 Aug 2023 Sep 2032 Aug 2038 Dec 2038 Aug 2039 Nov 2039 Nov 2039 - - - - 36.242 36.242 DDG 149 2026 Aug 2023 Aug 2029 Sep 2036 Dec 2036 Aug 2037 Nov 2037 Nov 2037 - - - - 37.155 37.155 DDG 147 2026 Aug 2023 Sep 2033 Aug 2039 Dec 2039 Aug 2040 Nov 2040 Nov 2040 - - - - 36.181 36.181 DDG 150 2027 Aug 2023 Sep 2034 Aug 2040 Dec 2040 Aug 2041 Nov 2041 Nov 2041 - - - - 37.168 37.168 DDG 151 2028 Sep 2028 Aug 2036 Aug 2041 Dec 2041 Aug 2042 Nov 2042 Nov 2042 - - - - 38.245 38.245 DDG 152 2029 Sep 2028 Aug 2037 Aug 2042 Dec 2042 Aug 2043 Nov 2043 Nov 2043 - - - - 41.855 41.855 DDG 153 2030 Sep 2028 Aug 2038 Aug 2043 Dec 2043 Aug 2044 Nov 2044 Nov 2044 - - - - 42.933 42.933 DDG 154 2030 Sep 2028 Aug 2038 Aug 2043 Dec 2043 Aug 2044 Nov 2044 Nov 2044 - - - - 42.933 42.933 DDG 155 2031 Sep 2028 Aug 2039 Aug 2044 Dec 2044 Aug 2045 Nov 2045 Nov 2045 - - - - 44.039 44.039 DDG 156 2031 Sep 2028 Aug 2039 Aug 2044 Dec 2044 Aug 2045 Nov 2045 Nov 2045 - - - - 44.039 44.039 LI 5110 - Outfitting Navy Jun 2013 Apr 2012 Prior Years UNCLASSIFIED Page 3 of 13 P-1 Line #36 Volume 1 - 399 === page 450 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Class Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date Prior Years FY 2025 FY 2026 FY 2027 DDG Total 95.330 53.413 67.651 31.239 To Complete 911.409 Total 1,159.042 LCS 25 2016 Mar 2016 Feb 2018 Feb 2023 Mar 2024 Mar 2025 Jan 2026 Jan 2026 8.150 - - - - 8.150 LCS 27 2017 Oct 2017 Nov 2018 Jul 2024 Feb 2025 Jul 2025 Apr 2026 Dec 2026 8.216 - - - - 8.216 LCS 29 2018 Sep 2018 Jun 2019 Sep 2024 May 2025 Sep 2026 Apr 2027 Apr 2027 8.494 - - - - 8.494 LCS 36 2019 Dec 2018 Jan 2021 Mar 2024 Jan 2025 Jun 2025 Aug 2025 Dec 2025 8.770 - - - - 8.770 LCS 38 2019 Dec 2018 Nov 2021 Jul 2025 Jan 2026 Jul 2026 Oct 2026 Dec 2026 8.990 - - - - 8.990 LCS 31 2019 Jan 2019 Jun 2020 Dec 2025 Nov 2026 May 2027 Oct 2027 Oct 2027 8.634 - - - - 8.634 51.254 - - - - 51.254 LCS Total LPD Flight II 30 2018 Mar 2019 Mar 2020 Apr 2027 Sep 2028 May 2029 Aug 2029 Aug 2029 16.388 6.728 3.017 5.848 11.183 43.164 LPD Flight II 31 2021 Apr 2020 Sep 2022 Feb 2029 May 2030 Jan 2031 Apr 2031 Apr 2031 - - - 17.317 35.655 52.972 LPD Flight II 32 2023 Mar 2023 Jan 2025 Feb 2031 Jan 2032 Jul 2032 Dec 2032 Dec 2032 - - - - 59.437 59.437 LPD Flight II 33 2025 Sep 2024 Aug 2027 Dec 2032 Nov 2033 May 2034 Oct 2034 Oct 2034 - - - - 64.050 64.050 LPD Flight II 34 2027 Sep 2024 Jun 2029 Oct 2034 Sep 2035 Mar 2036 Aug 2036 Aug 2036 - - - - 67.220 67.220 LPD Flight II 35 2029 Sep 2024 Apr 2031 Aug 2036 Jul 2037 Jan 2038 Jun 2038 Jun 2038 - - - - 71.553 71.553 16.388 6.728 3.017 23.165 309.098 358.396 31.294 - - - - 31.294 31.294 - - - - 31.294 LPD Flight II Total LPD 29 2017 Feb 2018 Jul 2018 Apr 2024 Nov 2025 Jun 2026 Mar 2027 Apr 2027 LPD Total ESB 6 2018 Aug 2019 Jun 2020 Mar 2023 Jun 2023 Sep 2023 Jan 2024 Dec 2024 17.768 - - - - 17.768 ESB 7 2019 Aug 2019 Dec 2021 Sep 2024 Dec 2024 Oct 2025 Nov 2025 Nov 2025 17.798 - - - - 17.798 ESB 8 2022 Jul 2022 Aug 2023 Aug 2026 Nov 2026 Feb 2027 May 2027 Oct 2027 - 10.177 6.061 - 2.067 18.305 35.566 10.177 6.061 - 2.067 53.871 ESB Total LHA 8 2017 Jun 2017 Oct 2018 Jul 2027 Sep 2028 Apr 2029 Aug 2029 Aug 2029 46.426 13.300 4.600 6.000 6.600 76.926 LHA 9 2023 Oct 2022 Dec 2022 Jul 2031 Sep 2032 Apr 2033 Aug 2033 Aug 2033 - - - - 84.886 84.886 LHA 10 2027 Sep 2024 Feb 2028 Sep 2034 Dec 2035 Jul 2036 Nov 2036 Nov 2036 - - - - 84.993 84.993 46.426 13.300 4.600 6.000 176.479 246.805 LHA Total EMS 1 2022 Dec 2023 Aug 2026 Dec 2029 Mar 2030 Sep 2030 Dec 2030 Feb 2031 - - - 2.200 13.850 16.050 EMS 2 2023 Dec 2023 Aug 2027 Dec 2030 Mar 2031 Sep 2031 Dec 2031 Feb 2032 - - - - 16.753 16.753 EMS 3 2023 Dec 2023 Aug 2028 Dec 2031 Mar 2032 Sep 2032 Dec 2032 Feb 2033 - - - - 17.342 17.342 EMS Total - - - 2.200 47.945 50.145 EPF 14 2019 Mar 2019 Oct 2020 Jan 2024 Mar 2024 Nov 2024 Feb 2025 Mar 2025 14.161 - - - - 14.161 EPF 15 2021 Dec 2021 Jan 2022 Jun 2025 Sep 2025 Mar 2026 Jun 2026 Aug 2026 10.695 - 2.090 - - 12.785 EPF 16 2022 May 2022 Sep 2023 Nov 2026 Feb 2027 Aug 2027 Nov 2027 Jan 2028 - 7.500 4.325 - 1.731 13.556 24.856 7.500 6.415 - 1.731 40.502 EPF Total LSM 9 2026 Aug 2026 Mar 2027 Mar 2030 Jul 2030 Jan 2031 Apr 2031 Jun 2031 - - - - 11.000 11.000 LSM 10 2026 Aug 2026 Sep 2027 Sep 2030 Jan 2031 Jul 2031 Oct 2031 Dec 2031 - - - - 11.000 11.000 LSM 17 2028 May 2028 Oct 2028 Oct 2031 Feb 2032 Aug 2032 Nov 2032 Nov 2033 - - - - 11.400 11.400 LSM 18 2028 May 2028 Apr 2029 Apr 2032 Aug 2032 Feb 2033 May 2033 Jul 2033 - - - - 11.400 11.400 LSM 19 2028 May 2028 Apr 2030 Apr 2033 Aug 2033 Feb 2034 May 2034 Jul 2034 - - - - 11.740 11.740 LSM 20 2028 May 2028 Apr 2031 Mar 2034 Aug 2034 Feb 2035 May 2035 Jul 2035 - - - - 12.100 12.100 LI 5110 - Outfitting Navy UNCLASSIFIED Page 4 of 13 P-1 Line #36 Volume 1 - 400 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date LSM 21 2028 May 2028 Apr 2032 Mar 2035 Aug 2035 Jan 2036 Apr 2036 Jun 2036 LSM 22 2028 May 2028 Apr 2033 Mar 2036 Jul 2036 Jan 2037 Apr 2037 LSM 23 2029 May 2029 Oct 2029 Oct 2032 Feb 2033 Aug 2033 Nov 2033 Ship Class Prior Years FY 2025 FY 2026 FY 2027 To Complete - - - - 12.500 12.500 Jun 2037 - - - - 12.830 12.830 Jan 2034 - - - - 13.215 13.215 LSM Total - - - - 107.185 107.185 Total T-AO 206 2018 Mar 2018 Dec 2019 Jul 2023 Oct 2023 Jan 2025 Jun 2025 Jul 2025 17.758 - - - - 17.758 T-AO 207 2019 Dec 2018 Dec 2020 May 2024 Jul 2024 Oct 2025 Mar 2026 Apr 2026 17.771 - - - - 17.771 T-AO 208 2019 Dec 2018 May 2021 Dec 2024 Mar 2025 Mar 2026 Jul 2026 Aug 2026 17.879 - - - - 17.879 T-AO 209 2020 Mar 2020 Oct 2022 Dec 2025 Mar 2026 Jul 2026 Oct 2026 Feb 2027 18.517 - - - - 18.517 T-AO 210 2020 Mar 2020 Mar 2023 Aug 2026 Nov 2026 Mar 2027 Jun 2027 Oct 2027 - 18.782 - - - 18.782 T-AO 211 2022 Jun 2022 Mar 2024 Jun 2027 Sep 2027 Jan 2028 Apr 2028 Aug 2028 - 0.113 14.896 - - 15.009 T-AO 212 2022 Jun 2022 Oct 2024 Dec 2027 Mar 2028 Jul 2028 Oct 2028 Feb 2029 - - 13.756 5.837 - 19.593 T-AO 213 2023 May 2023 Jun 2025 Sep 2028 Dec 2028 Apr 2029 Jul 2029 Nov 2029 - - - 19.789 - 19.789 T-AO 214 2024 Sep 2024 Dec 2025 Mar 2029 Jun 2029 Oct 2029 Jan 2030 May 2030 - - - 6.862 13.073 19.935 T-AO 215 2026 Nov 2025 Jul 2026 Oct 2029 Jan 2030 May 2030 Aug 2030 Dec 2030 - - - - 20.364 20.364 T-AO 216 2026 Nov 2025 Jan 2027 Apr 2030 Jul 2030 Nov 2030 Feb 2031 Jun 2031 - - - - 20.416 20.416 T-AO 217 2026 May 2026 Jul 2027 Oct 2030 Jan 2031 May 2031 Aug 2031 Dec 2031 - - - - 20.770 20.770 T-AO 218 2027 Mar 2027 Aug 2028 Sep 2031 Dec 2031 Apr 2032 Jul 2032 Nov 2032 - - - - 20.893 20.893 T-AO 219 2027 Mar 2027 Feb 2029 Mar 2032 Jun 2032 Oct 2032 Jan 2033 May 2033 - - - - 21.176 21.176 71.925 18.895 28.652 32.488 116.692 268.652 T-AO Total T-AGOS 25 2022 May 2023 Apr 2027 Jul 2031 Mar 2032 Dec 2032 Feb 2033 Feb 2033 - - - - 9.328 9.328 T-AGOS 26 2026 Jun 2026 Jan 2028 Mar 2032 Nov 2032 Jul 2033 Oct 2033 Oct 2033 - - - - 9.428 9.428 T-AGOS 27 2027 Feb 2027 Jan 2029 Feb 2033 Oct 2033 Jun 2034 Sep 2034 Sep 2034 - - - - 9.616 9.616 T-AGOS 28 2028 Feb 2028 Jan 2030 Jan 2034 Sep 2034 May 2035 Aug 2035 Aug 2035 - - - - 9.816 9.816 T-AGOS 29 2029 Feb 2029 Jan 2031 Jan 2035 Sep 2035 May 2036 Aug 2036 Aug 2036 - - - - 10.020 10.020 T-AGOS 30 2030 Feb 2030 Jan 2032 Jan 2036 Sep 2036 May 2037 Aug 2037 Aug 2037 - - - - 10.155 10.155 T-AGOS 31 2031 Feb 2031 Jan 2033 Jan 2037 Sep 2037 May 2038 Aug 2038 Aug 2038 - - - - 10.155 10.155 T-AGOS Total - - - - 68.518 68.518 T-ATS 6 2016 Mar 2018 Jun 2019 Dec 2026 Jan 2027 Oct 2027 Dec 2027 Dec 2027 4.261 - - - - 4.261 T-ATS 7 2018 Apr 2019 Oct 2019 Jun 2027 Aug 2027 May 2028 Jul 2028 Jul 2028 4.239 - - - - 4.239 T-ATS 8 2019 Apr 2019 Feb 2020 Aug 2028 Oct 2028 Jul 2029 Sep 2029 Sep 2029 4.231 - - - - 4.231 T-ATS 9 2020 Apr 2020 Aug 2022 Apr 2029 May 2029 Feb 2030 Apr 2030 Apr 2030 4.233 - - - - 4.233 T-ATS 10 2020 Apr 2020 Mar 2023 Oct 2029 Nov 2029 Jun 2030 Oct 2030 Oct 2030 4.231 - - - - 4.231 T-ATS 11 2021 Sep 2021 Jul 2022 Jun 2026 Jul 2026 Mar 2027 May 2027 Jun 2027 4.310 - - - - 4.310 T-ATS 12 2021 Sep 2021 Jan 2023 May 2027 Jun 2027 Mar 2028 May 2028 May 2028 4.217 - - - - 4.217 T-ATS 13 2022 Jul 2022 Jun 2024 Aug 2028 Sep 2028 Jun 2029 Aug 2029 Aug 2029 - 3.800 - 4.375 - 8.175 T-ATS Total 29.722 3.800 - 4.375 - 37.897 Feb 2029 - 1.750 6.000 - 0.750 8.500 - 1.750 6.000 - 0.750 8.500 1.132 - - - - 1.132 T-AGS/AGOR 67 2018 Jun 2021 May 2022 Dec 2027 Mar 2028 Sep 2028 Oct 2028 T-AGS/AGOR Total LCU LI 5110 - Outfitting Navy 1700 2016 Mar 2018 Feb 2020 Feb 2024 Feb 2024 UNCLASSIFIED Page 5 of 13 Jan 2025 P-1 Line #36 Volume 1 - 401 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO FY 2025 FY 2026 FY 2027 To Complete LCU 1701 2019 Feb 2019 Aug 2020 Feb 2024 Feb 2024 Jan 2025 1.166 - - - - LCU 1702 2019 Feb 2019 Nov 2020 Feb 2024 Feb 2024 1.166 Jan 2025 1.166 - - - - LCU 1703 2020 Apr 2020 Apr 2021 Feb 2024 1.166 Feb 2024 Jan 2025 1.166 - - - - LCU 1704 2020 Apr 2020 Sep 2021 1.166 Feb 2024 Feb 2024 Jan 2025 0.894 - - - - LCU 1705 2020 Apr 2020 0.894 Apr 2022 Feb 2024 Feb 2024 Jan 2025 0.158 - - - - LCU 1710 2021 0.158 Sep 2023 Apr 2024 May 2026 Feb 2027 Jul 2027 Sep 2027 Jan 2028 0.064 2.334 - - - LCU 1711 2.398 2022 Sep 2023 Dec 2024 Nov 2026 Feb 2027 Oct 2027 Dec 2027 Jan 2028 - 2.488 - - - LCU 2.488 1712 2022 Sep 2023 Apr 2025 Mar 2027 Sep 2027 Jan 2028 Apr 2028 Aug 2028 - 1.188 1.300 - - 2.488 LCU 1713 2024 Jul 2024 Dec 2025 Jun 2027 Sep 2027 May 2028 Jul 2028 Aug 2028 - - 2.550 - - 2.550 LCU 1714 2024 Jul 2024 Apr 2026 Jul 2027 Feb 2028 Jul 2028 Sep 2028 Jan 2029 - - 1.023 - 1.527 2.550 5.746 6.010 4.873 - 1.527 18.156 Ship Class PSA Start PSA Finish OWL Date LCU Total Prior Years Total LCAC 111 2018 Apr 2020 Aug 2019 Nov 2024 Nov 2025 Apr 2026 Aug 2026 Sep 2026 1.121 - - - - 1.121 LCAC 112 2018 Apr 2020 Feb 2020 Mar 2025 Nov 2025 May 2026 Sep 2026 Sep 2026 1.145 - - - - 1.145 LCAC 113 2018 Apr 2020 Aug 2020 Jun 2025 Dec 2026 Dec 2026 Aug 2027 Nov 2027 1.145 - - - - 1.145 LCAC 114 2018 Apr 2020 Dec 2020 Aug 2025 Dec 2026 Feb 2027 Sep 2027 Nov 2027 1.145 - - - - 1.145 LCAC 115 2018 Apr 2020 Jul 2021 Mar 2026 Dec 2026 May 2027 Nov 2027 Nov 2027 1.145 - - - - 1.145 LCAC 116 2018 Apr 2020 Jan 2022 Apr 2026 Jul 2027 Jul 2027 Feb 2028 Jun 2028 1.179 - - - - 1.179 LCAC 117 2019 Apr 2020 Jun 2022 Jun 2026 Jul 2027 Sep 2027 Apr 2028 Jun 2028 0.082 1.194 - - - 1.276 LCAC 118 2019 Apr 2020 Dec 2022 Sep 2026 Jul 2027 Dec 2027 Jun 2028 Jun 2028 - 0.861 0.415 - - 1.276 LCAC 119 2019 Apr 2020 May 2023 Dec 2026 Feb 2028 Mar 2028 Oct 2028 Jan 2029 - - 1.308 - - 1.308 LCAC 120 2019 Apr 2020 Sep 2023 Mar 2027 Feb 2028 Apr 2028 Nov 2028 Jan 2029 - - 1.308 - - 1.308 LCAC 121 2019 Apr 2020 Jan 2024 Jun 2027 Sep 2028 Oct 2028 May 2029 Aug 2029 - - 0.711 0.597 - 1.308 LCAC 122 2019 Apr 2020 Apr 2024 Sep 2027 Sep 2028 Nov 2028 Jun 2029 Aug 2029 - - - 1.308 - 1.308 LCAC 123 2020 Apr 2020 Aug 2024 Dec 2027 Apr 2029 May 2029 Nov 2029 Feb 2030 - - - 1.341 - 1.341 LCAC 124 2022 Nov 2024 Nov 2024 Mar 2028 Apr 2029 Jun 2029 Jan 2030 Feb 2030 - - - 0.968 0.373 1.341 LCAC 125 2022 Nov 2024 Mar 2025 Jun 2028 Oct 2029 Nov 2029 Jun 2030 Sep 2030 - - - - 1.341 1.341 LCAC 126 2023 Nov 2024 Jun 2025 Sep 2028 Oct 2029 Jan 2030 Aug 2030 Sep 2030 - - - - 1.341 1.341 LCAC 127 2023 Nov 2024 Sep 2025 Dec 2028 May 2030 Jun 2030 Jan 2031 Apr 2031 - - - - 1.374 1.374 LCAC 128 2023 Nov 2024 Dec 2025 Mar 2029 May 2030 Aug 2030 Mar 2031 Apr 2031 - - - - 1.374 1.374 LCAC 129 2024 Nov 2024 Mar 2026 Jun 2029 Dec 2030 Jan 2031 Aug 2031 Nov 2031 - - - - 1.374 1.374 LCAC 130 2024 Nov 2024 Jun 2026 Sep 2029 Dec 2030 Mar 2031 Oct 2031 Nov 2031 - - - - 1.374 1.374 LCAC 131 2024 Nov 2024 Sep 2026 Dec 2029 Jul 2031 Aug 2031 Mar 2032 Jun 2032 - - - - 1.408 1.408 LCAC 132 2024 Nov 2024 Dec 2026 Mar 2030 Jul 2031 Oct 2031 May 2032 Jun 2032 - - - - 1.408 1.408 LCAC 133 2025 Jun 2025 Mar 2027 Jun 2030 Feb 2032 Mar 2032 Oct 2032 Jan 2033 - - - - 1.408 1.408 LCAC 134 2025 Jun 2025 Jun 2027 Sep 2030 Feb 2032 May 2032 Dec 2032 Jan 2033 - - - - 1.408 1.408 LCAC 135 2025 Jun 2025 Sep 2027 Dec 2030 Sep 2032 Oct 2032 May 2033 Aug 2033 - - - - 1.444 1.444 LCAC 137 2026 Sep 2026 Mar 2028 Jun 2031 Mar 2033 Mar 2033 Jun 2033 Feb 2034 - - - - 1.444 1.444 LCAC 138 2026 Sep 2026 Jun 2028 Sep 2031 Mar 2033 Jun 2033 Sep 2033 Feb 2034 - - - - 1.444 1.444 LCAC 139 2027 Mar 2027 Sep 2028 Dec 2031 Oct 2033 Nov 2033 Feb 2034 Sep 2034 - - - - 1.444 1.444 LI 5110 - Outfitting Navy UNCLASSIFIED Page 6 of 13 P-1 Line #36 Volume 1 - 402 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-29, Outfitting: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date FY 2025 FY 2026 FY 2027 To Complete LCAC 140 2027 Mar 2027 Dec 2028 Mar 2032 Oct 2033 Feb 2034 May 2034 Sep 2034 - - - - 1.480 LCAC 141 2027 Mar 2027 Mar 2029 Jun 2032 Jun 2034 Jul 2034 Oct 2034 1.480 May 2035 - - - - 1.480 LCAC 142 2027 Mar 2027 Jun 2029 Sep 2032 Jun 2034 Oct 2034 1.480 Jan 2035 May 2035 - - - - 1.480 LCAC 143 2028 Mar 2028 Sep 2029 Dec 2032 Jan 2035 1.480 Jan 2035 May 2035 Dec 2035 - - - - 1.509 LCAC 144 2028 Mar 2028 Dec 2029 Mar 2033 1.509 Jan 2035 Apr 2035 Jul 2035 Dec 2035 - - - - 1.509 LCAC 145 2028 Mar 2028 Mar 2030 1.509 Jun 2033 Jul 2035 Aug 2035 Dec 2035 Jun 2036 - - - - 1.509 LCAC 146 2028 Mar 2028 1.509 Jun 2030 Sep 2033 Jul 2035 Oct 2035 Feb 2036 Jun 2036 - - - - 1.509 LCAC 147 2029 1.509 Mar 2029 Sep 2030 Dec 2033 Feb 2036 Mar 2036 Jul 2036 Jan 2037 - - - - 0.164 LCAC 148 0.164 2029 Mar 2029 Dec 2030 Mar 2034 Feb 2036 May 2036 Sep 2036 Jan 2037 - - - - 0.164 LCAC 0.164 149 2029 Mar 2029 Mar 2031 Jun 2034 Sep 2036 Oct 2036 Jan 2037 Aug 2037 - - - - 0.164 0.164 LCAC 150 2029 Mar 2029 Jun 2031 Sep 2034 Sep 2036 Dec 2036 Mar 2037 Aug 2037 - - - - 0.164 0.164 LCAC 151 2030 Mar 2030 Sep 2031 Dec 2034 Apr 2037 May 2037 Aug 2037 Mar 2038 - - - - 0.169 0.169 LCAC 152 2030 Mar 2030 Dec 2031 Mar 2035 Apr 2037 Jul 2037 Oct 2037 Mar 2038 - - - - 0.169 0.169 LCAC 153 2030 Mar 2030 Mar 2032 Jun 2035 Nov 2037 Dec 2037 Mar 2038 Oct 2038 - - - - 0.169 0.169 LCAC 154 2030 Mar 2030 Jun 2032 Sep 2035 Nov 2037 Feb 2038 May 2038 Oct 2038 - - - - 0.169 0.169 LCAC 155 2031 Mar 2031 Sep 2032 Dec 2035 Jun 2038 Jul 2038 Oct 2038 May 2039 - - - - 0.174 0.174 LCAC 156 2031 Mar 2031 Dec 2032 Mar 2036 Jun 2038 Sep 2038 Dec 2038 May 2039 - - - - 0.174 0.174 LCAC 157 2031 Mar 2031 Mar 2033 Jun 2036 Jan 2039 Feb 2039 May 2039 Dec 2039 - - - - 0.174 0.174 LCAC 158 2031 Mar 2031 Jun 2033 Sep 2036 Jan 2039 Apr 2039 Jul 2039 Dec 2039 - - - - 0.174 0.174 LCAC Total 6.962 2.055 3.742 4.214 32.463 49.436 Ship Class Prior Years Total LCAC SLEP 45 2021 Feb 2021 Jul 2021 Feb 2023 Apr 2023 May 2023 May 2023 Mar 2024 0.182 - - - - 0.182 LCAC SLEP 31 2021 Feb 2021 Nov 2021 Jul 2023 Aug 2023 Sep 2023 Sep 2023 Jul 2024 0.182 - - - - 0.182 LCAC SLEP 48 2021 Feb 2021 Mar 2022 Feb 2024 Mar 2024 Apr 2024 Apr 2024 Feb 2025 0.182 - - - - 0.182 LCAC SLEP 62 2022 Jul 2022 Mar 2023 Nov 2024 Dec 2024 Jan 2025 Jan 2025 Nov 2025 0.182 - - - - 0.182 LCAC SLEP 90 2023 Mar 2023 Aug 2023 Apr 2025 May 2025 Jun 2025 Jun 2025 Apr 2026 - - 0.242 - - 0.242 LCAC SLEP 81 2023 Mar 2023 Apr 2024 Nov 2025 Jan 2026 Feb 2026 Feb 2026 Dec 2026 - - 0.251 - - 0.251 LCAC SLEP 76 2024 Jun 2024 Mar 2025 Nov 2026 Dec 2026 Jan 2027 Jan 2027 Nov 2027 - - - 0.272 - 0.272 LCAC SLEP 73 2025 Apr 2025 Sep 2025 Apr 2027 May 2027 Jun 2027 Jun 2027 Apr 2028 - - - 0.251 0.013 0.264 LCAC SLEP 79 2025 Apr 2025 Mar 2026 Oct 2027 Nov 2027 Dec 2027 Dec 2027 Oct 2028 - - - - 0.264 0.264 LCAC SLEP 57 2027 Jan 2027 Apr 2027 Dec 2028 Jan 2029 Feb 2029 Feb 2029 Dec 2029 - - - - 0.523 0.523 LCAC SLEP 78 2027 Jan 2027 Nov 2027 Jul 2029 Aug 2029 Sep 2029 Sep 2029 Jul 2030 - - - - 0.277 0.277 LCAC SLEP 43 2028 Jan 2028 Jun 2028 Feb 2030 Mar 2030 Apr 2030 Apr 2030 Feb 2031 - - - - 0.219 0.219 0.728 - 0.493 0.523 1.296 3.040 62.082 9.466 10.510 10.740 56.365 149.163 LCAC SLEP Total PUBS LI 5110 - Outfitting Navy 0 2010 PUBS Total 62.082 9.466 10.510 10.740 56.365 149.163 Full Funding TOA - Outfitting Total 1,010.689 217.061 294.495 243.591 3,612.162 5,377.998 UNCLASSIFIED Page 7 of 13 P-1 Line #36 Volume 1 - 403 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date CO CLASS 826 2021 Oct 2020 Oct 2020 Mar 2029 Mar 2029 Jan 2029 Jul 2029 Aug 2030 CO CLASS 827 2024 Oct 2020 Sep 2023 Apr 2030 Apr 2030 Jan 2031 Jul 2031 CO CLASS 828 2026 May 2026 Apr 2025 Aug 2031 Aug 2031 May 2032 CO CLASS 829 2027 May 2026 Jun 2026 Sep 2032 Sep 2032 CO CLASS 830 2028 May 2026 Jun 2027 Aug 2033 CO CLASS 831 2029 May 2026 Jun 2028 CO CLASS 832 2030 May 2026 Jun 2029 Ship Class Prior Years FY 2027 To Complete FY 2025 FY 2026 - - - 7.739 171.372 179.111 Jun 2032 - - - - 262.808 262.808 Nov 2032 Sep 2033 - - - - 193.440 193.440 Jun 2033 Dec 2033 Oct 2034 - - - - 169.871 169.871 Aug 2033 Apr 2034 Sep 2034 Aug 2035 - - - - 162.738 162.738 Jul 2034 Jul 2034 Mar 2035 Aug 2035 Jul 2036 - - - - 167.404 167.404 Jun 2035 Jun 2035 Feb 2036 Jul 2036 Jun 2037 - - - - 172.087 172.087 CO CLASS Total - - - 7.739 1,299.720 1,307.459 CVN 79 2013 Jun 2015 Feb 2011 Mar 2027 Jul 2027 Jul 2027 Sep 2027 Jun 2028 - 7.377 33.429 75.944 CVN 80 2018 Jan 2019 Jan 2019 Mar 2031 Oct 2031 Nov 2031 Jan 2032 Sep 2032 - - - - 207.140 207.140 - 7.377 33.429 75.944 207.140 323.890 - - - - 218.108 218.108 - - - - 218.108 218.108 CVN Total CVN 81 2020 Jan 2019 Jan 2019 Feb 2034 Sep 2034 Oct 2034 Dec 2034 Aug 2035 CVN Total - Total 116.750 VIRGINIA 793 2014 Apr 2014 Sep 2014 Feb 2022 Feb 2022 Aug 2023 Mar 2025 May 2025 87.267 15.378 - - - 102.645 VIRGINIA 794 2015 Apr 2014 Apr 2015 Mar 2022 Mar 2022 Jan 2023 Nov 2024 Jan 2025 101.342 1.672 - - - 103.014 VIRGINIA 795 2015 Apr 2014 Sep 2015 Oct 2023 Oct 2023 Mar 2025 Feb 2026 Apr 2026 36.206 44.534 31.919 - - 112.659 VIRGINIA 796 2016 Apr 2014 Mar 2016 Apr 2024 Apr 2024 Mar 2025 Mar 2026 May 2026 36.751 47.356 21.891 - - 105.998 VIRGINIA 797 2016 Apr 2014 Sep 2016 Dec 2024 Dec 2024 Apr 2026 Oct 2026 Dec 2026 9.984 14.550 40.553 - - 65.087 VIRGINIA 798 2017 Apr 2014 Mar 2017 Nov 2025 Nov 2025 Aug 2026 Nov 2026 Jan 2027 - 7.327 44.153 4.115 - 55.595 VIRGINIA 799 2017 Apr 2014 Sep 2017 Dec 2025 Dec 2025 Oct 2026 Sep 2027 Nov 2027 - 2.553 36.363 68.257 - 107.173 VIRGINIA 800 2018 Apr 2014 Mar 2018 Dec 2026 Dec 2026 May 2027 Aug 2027 Nov 2027 - - 18.800 32.734 - 51.534 VIRGINIA 801 2018 Apr 2014 Sep 2018 May 2027 May 2027 Oct 2027 Jan 2028 Apr 2028 - - - 16.090 35.930 52.020 VIRGINIA 802 2019 Dec 2019 Sep 2019 Sep 2028 Sep 2028 Feb 2029 May 2029 Aug 2029 - - - 8.509 66.811 75.320 VIRGINIA 803 2019 Dec 2019 Mar 2020 Jul 2029 Jul 2029 Mar 2030 Nov 2030 Jan 2031 - - - - 88.667 88.667 VIRGINIA 804 2020 Dec 2019 Sep 2020 Jun 2030 Jun 2030 Nov 2030 Jul 2031 Sep 2031 - - - - 91.002 91.002 VIRGINIA 805 2020 Dec 2019 May 2021 Sep 2030 Sep 2030 Feb 2031 Oct 2031 Dec 2031 - - - - 73.067 73.067 VIRGINIA 806 2021 Dec 2019 Aug 2022 Apr 2031 Apr 2031 Aug 2031 Apr 2032 Jun 2032 - - - - 73.969 73.969 VIRGINIA 807 2021 Dec 2019 Nov 2022 Jan 2032 Jan 2032 May 2032 Jan 2033 Mar 2033 - - - - 74.011 74.011 VIRGINIA 808 2022 Dec 2019 Aug 2023 Nov 2031 Nov 2031 May 2032 Nov 2032 Jan 2033 - - - - 74.275 74.275 VIRGINIA 809 2022 Dec 2019 Dec 2023 Jul 2032 Jul 2032 Jan 2033 Jul 2033 Sep 2033 - - - - 75.924 75.924 VIRGINIA 810 2023 Dec 2019 May 2024 Nov 2032 Nov 2032 Apr 2033 Oct 2033 Dec 2033 - - - - 75.933 75.933 VIRGINIA 811 2023 Dec 2019 Nov 2024 Apr 2033 Apr 2033 Aug 2033 Mar 2034 May 2034 - - - - 75.933 75.933 VIRGINIA 813 2024 Apr 2025 May 2025 Jan 2034 Jan 2034 May 2034 Nov 2034 Jan 2035 - - - - 75.933 75.933 VIRGINIA 812 2024 Apr 2025 Jan 2026 Dec 2034 Dec 2034 Apr 2035 Oct 2035 Dec 2035 - - - - 75.933 75.933 VIRGINIA 814 2025 May 2026 Sep 2026 Apr 2035 Apr 2035 Jul 2035 Jan 2036 Mar 2036 - - - - 75.933 75.933 VIRGINIA 815 2026 May 2026 Mar 2027 Sep 2035 Sep 2035 Feb 2036 Aug 2036 Oct 2036 - - - - 75.933 75.933 VIRGINIA 816 2026 May 2026 Sep 2027 Feb 2036 Feb 2036 Jun 2036 Dec 2036 Feb 2037 - - - - 75.933 75.933 VIRGINIA 817 2027 May 2026 Mar 2028 Jul 2036 Jul 2036 Oct 2036 May 2037 Jul 2037 - - - - 75.933 75.933 1,261.120 1,989.424 VIRGINIA Total LI 5110 - Outfitting Navy UNCLASSIFIED Page 8 of 13 271.550 133.370 P-1 Line #36 193.679 129.705 Volume 1 - 404 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date CVN-RCOH 73 2016 Aug 2017 Aug 2017 May 2023 Jul 2023 May 2023 May 2024 Jun 2024 CVN-RCOH 74 2020 Jan 2021 May 2021 Apr 2028 Jul 2028 Aug 2028 May 2029 CVN-RCOH 75 2025 Sep 2026 Sep 2026 Nov 2031 Jan 2032 Feb 2032 Aug 2032 Ship Class FY 2025 FY 2026 FY 2027 To Complete 27.019 - - - - 27.019 Jun 2029 - - - 26.157 27.000 53.157 Dec 2032 - - - - 48.255 48.255 27.019 - - 26.157 75.255 128.431 CVN-RCOH Total DDG 1000 1002 2009 Sep 2011 Apr 2012 Apr 2028 Sep 2028 Apr 2029 Jul 2029 Prior Years Total Aug 2029 2.513 - 0.003 - 19.000 21.516 DDG 1000 Total 2.513 - 0.003 - 19.000 21.516 DDG 122 2015 Jun 2013 Sep 2017 Jul 2024 Nov 2024 Jun 2025 Oct 2025 Oct 2025 45.831 - - - - 45.831 DDG 124 2016 Jun 2013 Jul 2018 Nov 2025 Mar 2026 Oct 2026 Feb 2027 Feb 2027 23.430 28.005 - - - 51.435 DDG 127 2016 Sep 2017 Apr 2019 Sep 2026 Jan 2027 Sep 2027 Dec 2027 Dec 2027 - 5.753 51.331 - - 57.084 DDG 126 2017 Jun 2013 Mar 2020 Sep 2027 Jan 2028 Sep 2028 Dec 2028 Dec 2028 - - - 52.640 19.311 71.951 DDG 128 2018 Sep 2018 Apr 2020 Dec 2025 May 2026 May 2027 Sep 2027 Oct 2027 - 35.928 48.290 - - 84.218 DDG 129 2018 Sep 2018 Jan 2021 Aug 2027 Dec 2027 Jul 2028 Nov 2028 Nov 2028 - - - 54.286 12.051 66.337 DDG 131 2019 Sep 2018 Nov 2021 Nov 2028 Mar 2029 Oct 2029 Feb 2030 Feb 2030 - - - - 65.222 65.222 DDG 130 2019 Sep 2018 May 2021 Nov 2028 Mar 2029 Nov 2029 Feb 2030 Feb 2030 - - - - 66.426 66.426 DDG 132 2019 Dec 2018 Feb 2022 Sep 2029 Jan 2030 Sep 2030 Dec 2030 Dec 2030 - - - - 66.190 66.190 DDG 133 2020 Sep 2018 Dec 2022 Feb 2030 Jun 2030 Jan 2031 May 2031 May 2031 - - - - 66.299 66.299 DDG 134 2020 Sep 2018 Nov 2023 Oct 2030 Feb 2031 Oct 2031 Jan 2032 Jan 2032 - - - - 66.769 66.769 DDG 135 2020 Jun 2020 Nov 2023 Feb 2031 Jun 2031 Jan 2032 May 2032 May 2032 - - - - 66.696 66.696 DDG 136 2021 Sep 2018 Apr 2024 Jun 2031 Oct 2031 May 2032 Sep 2032 Oct 2032 - - - - 69.194 69.194 DDG 137 2021 Sep 2018 Mar 2026 Feb 2032 Jun 2032 Jan 2033 May 2033 May 2033 - - - - 69.934 69.934 DDG 138 2022 Sep 2018 Mar 2025 Oct 2032 Feb 2033 Sep 2033 Jan 2034 Jan 2034 - - - - 68.904 68.904 DDG 139 2022 Sep 2018 Sep 2027 Aug 2033 Nov 2033 Jul 2034 Oct 2034 Oct 2034 - - - - 69.466 69.466 DDG 140 2023 Aug 2023 Jul 2026 Dec 2033 Apr 2034 Nov 2034 Mar 2035 Mar 2035 - - - - 71.962 71.962 DDG 141 2023 Aug 2023 Sep 2028 Aug 2034 Dec 2034 Aug 2035 Nov 2035 Nov 2035 - - - - 70.921 70.921 DDG 142 2023 Aug 2023 Sep 2029 Aug 2035 Dec 2035 Aug 2036 Nov 2036 Nov 2036 - - - - 71.820 71.820 DDG 144 2024 Aug 2023 Aug 2027 Jan 2035 May 2035 Dec 2035 Mar 2036 Apr 2036 - - - - 71.748 71.748 DDG 143 2024 Aug 2023 Sep 2030 Aug 2036 Dec 2036 Aug 2037 Nov 2037 Nov 2037 - - - - 72.478 72.478 DDG 148 2025 Jul 2025 Aug 2028 Nov 2035 Mar 2036 Oct 2036 Jan 2037 Feb 2037 - - - - 72.859 72.859 DDG 145 2025 Aug 2023 Sep 2031 Aug 2037 Dec 2037 Aug 2038 Nov 2038 Nov 2038 - - - - 72.181 72.181 DDG 146 2025 Aug 2023 Sep 2032 Aug 2038 Dec 2038 Aug 2039 Nov 2039 Nov 2039 - - - - 72.507 72.507 DDG 149 2026 Aug 2023 Aug 2029 Sep 2036 Dec 2036 Aug 2037 Nov 2037 Nov 2037 - - - - 72.995 72.995 DDG 147 2026 Aug 2023 Sep 2033 Aug 2039 Dec 2039 Aug 2040 Nov 2040 Nov 2040 - - - - 72.556 72.556 DDG 150 2027 Aug 2023 Sep 2034 Aug 2040 Dec 2040 Aug 2041 Nov 2041 Nov 2041 - - - - 73.343 73.343 DDG 151 2028 Sep 2028 Aug 2036 Aug 2041 Dec 2041 Aug 2042 Nov 2042 Nov 2042 - - - - 73.834 73.834 DDG 152 2029 Sep 2028 Aug 2037 Aug 2042 Dec 2042 Aug 2043 Nov 2043 Nov 2043 - - - - 75.013 75.013 DDG 153 2030 Sep 2028 Aug 2038 Aug 2043 Dec 2043 Aug 2044 Nov 2044 Nov 2044 - - - - 74.963 74.963 DDG 154 2030 Sep 2028 Aug 2038 Aug 2043 Dec 2043 Aug 2044 Nov 2044 Nov 2044 - - - - 74.963 74.963 DDG 155 2031 Sep 2028 Aug 2039 Aug 2044 Dec 2044 Aug 2045 Nov 2045 Nov 2045 - - - - 74.982 74.982 DDG 156 2031 Sep 2028 Aug 2039 Aug 2044 Dec 2044 Aug 2045 Nov 2045 Nov 2045 - - - - 74.982 74.982 LI 5110 - Outfitting Navy UNCLASSIFIED Page 9 of 13 P-1 Line #36 Volume 1 - 405 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Class Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date Prior Years FY 2025 FY 2026 DDG Total 69.261 69.686 99.621 FY 2027 106.926 To Complete 1,950.569 Total 2,296.063 LCS 25 2016 Mar 2016 Feb 2018 Feb 2023 Mar 2024 Mar 2025 Jan 2026 Jan 2026 49.144 16.087 - - - 65.231 LCS 27 2017 Oct 2017 Nov 2018 Jul 2024 Feb 2025 Jul 2025 Apr 2026 Dec 2026 34.752 14.723 12.059 - - 61.534 LCS 29 2018 Sep 2018 Jun 2019 Sep 2024 May 2025 Sep 2026 Apr 2027 Apr 2027 29.377 6.591 25.975 0.198 - 62.141 LCS 36 2019 Dec 2018 Jan 2021 Mar 2024 Jan 2025 Jun 2025 Aug 2025 Dec 2025 26.780 10.312 - - - 37.092 LCS 38 2019 Dec 2018 Nov 2021 Jul 2025 Jan 2026 Jul 2026 Oct 2026 Dec 2026 3.478 16.396 18.165 - - 38.039 LCS 31 2019 Jan 2019 Jun 2020 Dec 2025 Nov 2026 May 2027 Oct 2027 Oct 2027 3.424 0.985 32.987 23.969 - 61.365 146.955 65.094 89.186 24.167 - 325.402 LCS Total LPD Flight II 30 2018 Mar 2019 Mar 2020 Apr 2027 Sep 2028 May 2029 Aug 2029 Aug 2029 - 9.778 46.073 32.867 3.989 92.707 LPD Flight II 31 2021 Apr 2020 Sep 2022 Feb 2029 May 2030 Jan 2031 Apr 2031 Apr 2031 - - - 6.627 92.366 98.993 LPD Flight II 32 2023 Mar 2023 Jan 2025 Feb 2031 Jan 2032 Jul 2032 Dec 2032 Dec 2032 - - - - 97.451 97.451 LPD Flight II 33 2025 Sep 2024 Aug 2027 Dec 2032 Nov 2033 May 2034 Oct 2034 Oct 2034 - - - - 100.375 100.375 LPD Flight II 34 2027 Sep 2024 Jun 2029 Oct 2034 Sep 2035 Mar 2036 Aug 2036 Aug 2036 - - - - 103.386 103.386 LPD Flight II 35 2029 Sep 2024 Apr 2031 Aug 2036 Jul 2037 Jan 2038 Jun 2038 Jun 2038 - - - - 106.488 106.488 - 9.778 46.073 39.494 504.055 599.400 46.642 54.583 33.000 - - 134.225 46.642 54.583 33.000 - - 134.225 LPD Flight II Total LPD 29 2017 Feb 2018 Jul 2018 Apr 2024 Nov 2025 Jun 2026 Mar 2027 Apr 2027 LPD Total ESB 6 2018 Aug 2019 Jun 2020 Mar 2023 Jun 2023 Sep 2023 Jan 2024 Dec 2024 12.550 - - - - 12.550 ESB 7 2019 Aug 2019 Dec 2021 Sep 2024 Dec 2024 Oct 2025 Nov 2025 Nov 2025 12.500 - - - - 12.500 ESB 8 2022 Jul 2022 Aug 2023 Aug 2026 Nov 2026 Feb 2027 May 2027 Oct 2027 - - 5.797 7.431 2.606 15.834 25.050 - 5.797 7.431 2.606 40.884 ESB Total LHA 8 2017 Jun 2017 Oct 2018 Jul 2027 Sep 2028 Apr 2029 Aug 2029 Aug 2029 5.200 0.869 18.519 5.586 56.980 87.154 LHA 9 2023 Oct 2022 Dec 2022 Jul 2031 Sep 2032 Apr 2033 Aug 2033 Aug 2033 - - - - 89.768 89.768 LHA 10 2027 Sep 2024 Feb 2028 Sep 2034 Dec 2035 Jul 2036 Nov 2036 Nov 2036 - - - - 92.461 92.461 5.200 0.869 18.519 5.586 239.209 269.383 LHA Total EMS 1 2022 Dec 2023 Aug 2026 Dec 2029 Mar 2030 Sep 2030 Dec 2030 Feb 2031 - - - 2.285 8.776 11.061 EMS 2 2023 Dec 2023 Aug 2027 Dec 2030 Mar 2031 Sep 2031 Dec 2031 Feb 2032 - - - - 10.741 10.741 EMS 3 2023 Dec 2023 Aug 2028 Dec 2031 Mar 2032 Sep 2032 Dec 2032 Feb 2033 - - - - 10.693 10.693 EMS Total - - - 2.285 30.210 32.495 EPF 14 2019 Mar 2019 Oct 2020 Jan 2024 Mar 2024 Nov 2024 Feb 2025 Mar 2025 4.098 - - - - 4.098 EPF 15 2021 Dec 2021 Jan 2022 Jun 2025 Sep 2025 Mar 2026 Jun 2026 Aug 2026 3.276 - 0.575 - - 3.851 EPF 16 2022 May 2022 Sep 2023 Nov 2026 Feb 2027 Aug 2027 Nov 2027 Jan 2028 - - 1.564 - 2.437 4.001 7.374 - 2.139 - 2.437 11.950 EPF Total LSM 9 2026 Aug 2026 Mar 2027 Mar 2030 Jul 2030 Jan 2031 Apr 2031 Jun 2031 - - - - 9.000 9.000 LSM 10 2026 Aug 2026 Sep 2027 Sep 2030 Jan 2031 Jul 2031 Oct 2031 Dec 2031 - - - - 9.000 9.000 LSM 17 2028 May 2028 Oct 2028 Oct 2031 Feb 2032 Aug 2032 Nov 2032 Nov 2033 - - - - 9.000 9.000 LSM 18 2028 May 2028 Apr 2029 Apr 2032 Aug 2032 Feb 2033 May 2033 Jul 2033 - - - - 9.000 9.000 LSM 19 2028 May 2028 Apr 2030 Apr 2033 Aug 2033 Feb 2034 May 2034 Jul 2034 - - - - 9.000 9.000 LSM 20 2028 May 2028 Apr 2031 Mar 2034 Aug 2034 Feb 2035 May 2035 Jul 2035 - - - - 9.000 9.000 LI 5110 - Outfitting Navy UNCLASSIFIED Page 10 of 13 P-1 Line #36 Volume 1 - 406 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date LSM 21 2028 May 2028 Apr 2032 Mar 2035 Aug 2035 Jan 2036 Apr 2036 Jun 2036 LSM 22 2028 May 2028 Apr 2033 Mar 2036 Jul 2036 Jan 2037 Apr 2037 LSM 23 2029 May 2029 Oct 2029 Oct 2032 Feb 2033 Aug 2033 Nov 2033 Ship Class Prior Years FY 2025 FY 2026 FY 2027 To Complete - - - - 9.000 9.000 Jun 2037 - - - - 9.000 9.000 Jan 2034 - - - - 9.000 9.000 LSM Total - - - - 81.000 81.000 Total T-AO 206 2018 Mar 2018 Dec 2019 Jul 2023 Oct 2023 Jan 2025 Jun 2025 Jul 2025 24.116 - - - - 24.116 T-AO 207 2019 Dec 2018 Dec 2020 May 2024 Jul 2024 Oct 2025 Mar 2026 Apr 2026 22.237 - - - - 22.237 T-AO 208 2019 Dec 2018 May 2021 Dec 2024 Mar 2025 Mar 2026 Jul 2026 Aug 2026 - 9.552 13.626 - - 23.178 T-AO 209 2020 Mar 2020 Oct 2022 Dec 2025 Mar 2026 Jul 2026 Oct 2026 Feb 2027 - - 20.065 2.600 - 22.665 T-AO 210 2020 Mar 2020 Mar 2023 Aug 2026 Nov 2026 Mar 2027 Jun 2027 Oct 2027 - - 1.505 21.196 - 22.701 T-AO 211 2022 Jun 2022 Mar 2024 Jun 2027 Sep 2027 Jan 2028 Apr 2028 Aug 2028 - - - 4.051 18.643 22.694 T-AO 212 2022 Jun 2022 Oct 2024 Dec 2027 Mar 2028 Jul 2028 Oct 2028 Feb 2029 - - - - 23.033 23.033 T-AO 213 2023 May 2023 Jun 2025 Sep 2028 Dec 2028 Apr 2029 Jul 2029 Nov 2029 - - - - 23.506 23.506 T-AO 214 2024 Sep 2024 Dec 2025 Mar 2029 Jun 2029 Oct 2029 Jan 2030 May 2030 - - - - 23.483 23.483 T-AO 215 2026 Nov 2025 Jul 2026 Oct 2029 Jan 2030 May 2030 Aug 2030 Dec 2030 - - - - 23.997 23.997 T-AO 216 2026 Nov 2025 Jan 2027 Apr 2030 Jul 2030 Nov 2030 Feb 2031 Jun 2031 - - - - 24.453 24.453 T-AO 217 2026 May 2026 Jul 2027 Oct 2030 Jan 2031 May 2031 Aug 2031 Dec 2031 - - - - 24.453 24.453 T-AO 218 2027 Mar 2027 Aug 2028 Sep 2031 Dec 2031 Apr 2032 Jul 2032 Nov 2032 - - - - 24.453 24.453 T-AO 219 2027 Mar 2027 Feb 2029 Mar 2032 Jun 2032 Oct 2032 Jan 2033 May 2033 - - - - 24.453 24.453 46.353 9.552 35.196 27.847 210.474 329.422 T-AO Total T-AGOS 25 2022 May 2023 Apr 2027 Jul 2031 Mar 2032 Dec 2032 Feb 2033 Feb 2033 - - - - 8.500 8.500 T-AGOS 26 2026 Jun 2026 Jan 2028 Mar 2032 Nov 2032 Jul 2033 Oct 2033 Oct 2033 - - - - 8.623 8.623 T-AGOS 27 2027 Feb 2027 Jan 2029 Feb 2033 Oct 2033 Jun 2034 Sep 2034 Sep 2034 - - - - 8.786 8.786 T-AGOS 28 2028 Feb 2028 Jan 2030 Jan 2034 Sep 2034 May 2035 Aug 2035 Aug 2035 - - - - 8.786 8.786 T-AGOS 29 2029 Feb 2029 Jan 2031 Jan 2035 Sep 2035 May 2036 Aug 2036 Aug 2036 - - - - 8.786 8.786 T-AGOS 30 2030 Feb 2030 Jan 2032 Jan 2036 Sep 2036 May 2037 Aug 2037 Aug 2037 - - - - 8.786 8.786 T-AGOS 31 2031 Feb 2031 Jan 2033 Jan 2037 Sep 2037 May 2038 Aug 2038 Aug 2038 - - - - 8.786 8.786 T-AGOS Total - - - - 61.053 61.053 T-ATS 6 2016 Mar 2018 Jun 2019 Dec 2026 Jan 2027 Oct 2027 Dec 2027 Dec 2027 - - 4.681 1.227 - 5.908 T-ATS 7 2018 Apr 2019 Oct 2019 Jun 2027 Aug 2027 May 2028 Jul 2028 Jul 2028 - - - 4.968 - 4.968 T-ATS 8 2019 Apr 2019 Feb 2020 Aug 2028 Oct 2028 Jul 2029 Sep 2029 Sep 2029 - - - - 5.069 5.069 T-ATS 9 2020 Apr 2020 Aug 2022 Apr 2029 May 2029 Feb 2030 Apr 2030 Apr 2030 - - - - 5.117 5.117 T-ATS 10 2020 Apr 2020 Mar 2023 Oct 2029 Nov 2029 Jun 2030 Oct 2030 Oct 2030 - - - - 5.258 5.258 T-ATS 11 2021 Sep 2021 Jul 2022 Jun 2026 Jul 2026 Mar 2027 May 2027 Jun 2027 - - 4.156 1.860 - 6.016 T-ATS 12 2021 Sep 2021 Jan 2023 May 2027 Jun 2027 Mar 2028 May 2028 May 2028 - - - 1.313 3.510 4.823 T-ATS 13 2022 Jul 2022 Jun 2024 Aug 2028 Sep 2028 Jun 2029 Aug 2029 Aug 2029 - - - - 4.906 4.906 T-ATS Total - - 8.837 9.368 23.860 42.065 Feb 2029 - - 2.150 1.944 - 4.094 - - 2.150 1.944 - 4.094 0.992 - - - - 0.992 T-AGS/AGOR 67 2018 Jun 2021 May 2022 Dec 2027 Mar 2028 Sep 2028 Oct 2028 T-AGS/AGOR Total LCU LI 5110 - Outfitting Navy 1700 2016 Mar 2018 Feb 2020 Feb 2024 Feb 2024 UNCLASSIFIED Page 11 of 13 Jan 2025 P-1 Line #36 Volume 1 - 407 === page 458 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO LCU 1701 2019 Feb 2019 Aug 2020 Feb 2024 Feb 2024 LCU 1710 2021 Sep 2023 Apr 2024 May 2026 Feb 2027 Jul 2027 LCU 1711 2022 Sep 2023 Dec 2024 Nov 2026 Feb 2027 LCU 1712 2022 Sep 2023 Apr 2025 Mar 2027 LCU 1713 2024 Jul 2024 Dec 2025 LCU 1714 2024 Jul 2024 Apr 2026 Ship Class PSA Start PSA Finish OWL Date Prior Years FY 2025 FY 2026 FY 2027 To Complete Total Jan 2025 0.174 - - - - 0.174 Sep 2027 Jan 2028 - 1.944 0.856 - - 2.800 Oct 2027 Dec 2027 Jan 2028 - - 2.500 - - 2.500 Sep 2027 Jan 2028 Apr 2028 Aug 2028 - - 1.425 1.025 0.050 2.500 Jun 2027 Sep 2027 May 2028 Jul 2028 Aug 2028 - - - - 3.005 3.005 Jul 2027 Feb 2028 Jul 2028 Sep 2028 Jan 2029 - - - - 3.005 3.005 1.166 1.944 4.781 1.025 6.060 14.976 LCU Total LCAC 111 2018 Apr 2020 Aug 2019 Nov 2024 Nov 2025 Apr 2026 Aug 2026 Sep 2026 3.060 1.424 - - - 4.484 LCAC 112 2018 Apr 2020 Feb 2020 Mar 2025 Nov 2025 May 2026 Sep 2026 Sep 2026 2.014 2.474 - - - 4.488 LCAC 113 2018 Apr 2020 Aug 2020 Jun 2025 Dec 2026 Dec 2026 Aug 2027 Nov 2027 - 4.484 - - - 4.484 LCAC 114 2018 Apr 2020 Dec 2020 Aug 2025 Dec 2026 Feb 2027 Sep 2027 Nov 2027 - 1.495 3.000 - - 4.495 LCAC 115 2018 Apr 2020 Jul 2021 Mar 2026 Dec 2026 May 2027 Nov 2027 Nov 2027 - - 4.199 - - 4.199 LCAC 116 2018 Apr 2020 Jan 2022 Apr 2026 Jul 2027 Jul 2027 Feb 2028 Jun 2028 - - 4.198 - - 4.198 LCAC 117 2019 Apr 2020 Jun 2022 Jun 2026 Jul 2027 Sep 2027 Apr 2028 Jun 2028 - - 2.397 1.802 - 4.199 LCAC 118 2019 Apr 2020 Dec 2022 Sep 2026 Jul 2027 Dec 2027 Jun 2028 Jun 2028 - - - 4.198 - 4.198 LCAC 119 2019 Apr 2020 May 2023 Dec 2026 Feb 2028 Mar 2028 Oct 2028 Jan 2029 - - - 4.450 - 4.450 LCAC 120 2019 Apr 2020 Sep 2023 Mar 2027 Feb 2028 Apr 2028 Nov 2028 Jan 2029 - - - 4.450 - 4.450 LCAC 121 2019 Apr 2020 Jan 2024 Jun 2027 Sep 2028 Oct 2028 May 2029 Aug 2029 - - - 4.450 - 4.450 LCAC 122 2019 Apr 2020 Apr 2024 Sep 2027 Sep 2028 Nov 2028 Jun 2029 Aug 2029 - - - 0.450 4.000 4.450 LCAC 123 2020 Apr 2020 Aug 2024 Dec 2027 Apr 2029 May 2029 Nov 2029 Feb 2030 - - - - 4.525 4.525 LCAC 124 2022 Nov 2024 Nov 2024 Mar 2028 Apr 2029 Jun 2029 Jan 2030 Feb 2030 - - - - 4.525 4.525 LCAC 125 2022 Nov 2024 Mar 2025 Jun 2028 Oct 2029 Nov 2029 Jun 2030 Sep 2030 - - - - 4.525 4.525 LCAC 126 2023 Nov 2024 Jun 2025 Sep 2028 Oct 2029 Jan 2030 Aug 2030 Sep 2030 - - - - 4.525 4.525 LCAC 127 2023 Nov 2024 Sep 2025 Dec 2028 May 2030 Jun 2030 Jan 2031 Apr 2031 - - - - 4.725 4.725 LCAC 128 2023 Nov 2024 Dec 2025 Mar 2029 May 2030 Aug 2030 Mar 2031 Apr 2031 - - - - 4.725 4.725 LCAC 129 2024 Nov 2024 Mar 2026 Jun 2029 Dec 2030 Jan 2031 Aug 2031 Nov 2031 - - - - 4.725 4.725 LCAC 130 2024 Nov 2024 Jun 2026 Sep 2029 Dec 2030 Mar 2031 Oct 2031 Nov 2031 - - - - 4.725 4.725 LCAC 131 2024 Nov 2024 Sep 2026 Dec 2029 Jul 2031 Aug 2031 Mar 2032 Jun 2032 - - - - 4.896 4.896 LCAC 132 2024 Nov 2024 Dec 2026 Mar 2030 Jul 2031 Oct 2031 May 2032 Jun 2032 - - - - 4.896 4.896 LCAC 133 2025 Jun 2025 Mar 2027 Jun 2030 Feb 2032 Mar 2032 Oct 2032 Jan 2033 - - - - 4.895 4.895 LCAC 134 2025 Jun 2025 Jun 2027 Sep 2030 Feb 2032 May 2032 Dec 2032 Jan 2033 - - - - 4.895 4.895 LCAC 135 2025 Jun 2025 Sep 2027 Dec 2030 Sep 2032 Oct 2032 May 2033 Aug 2033 - - - - 5.150 5.150 LCAC 137 2026 Sep 2026 Mar 2028 Jun 2031 Mar 2033 Mar 2033 Jun 2033 Feb 2034 - - - - 5.150 5.150 LCAC 138 2026 Sep 2026 Jun 2028 Sep 2031 Mar 2033 Jun 2033 Sep 2033 Feb 2034 - - - - 5.150 5.150 LCAC 139 2027 Mar 2027 Sep 2028 Dec 2031 Oct 2033 Nov 2033 Feb 2034 Sep 2034 - - - - 5.151 5.151 LCAC 140 2027 Mar 2027 Dec 2028 Mar 2032 Oct 2033 Feb 2034 May 2034 Sep 2034 - - - - 5.151 5.151 LCAC 141 2027 Mar 2027 Mar 2029 Jun 2032 Jun 2034 Jul 2034 Oct 2034 May 2035 - - - - 5.254 5.254 LCAC 142 2027 Mar 2027 Jun 2029 Sep 2032 Jun 2034 Oct 2034 Jan 2035 May 2035 - - - - 5.254 5.254 LCAC 143 2028 Mar 2028 Sep 2029 Dec 2032 Jan 2035 Jan 2035 May 2035 Dec 2035 - - - - 5.254 5.254 LI 5110 - Outfitting Navy UNCLASSIFIED Page 12 of 13 P-1 Line #36 Volume 1 - 408 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-30, Delivery: PB 2027 Navy P-1 Line Item Number / Title: 5110 / Outfitting Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Hull Number Program Year Contract Award Start of Const. Delivery Date CFO PSA Start PSA Finish OWL Date FY 2025 FY 2026 FY 2027 To Complete LCAC 144 2028 Mar 2028 Dec 2029 Mar 2033 Jan 2035 Apr 2035 Jul 2035 Dec 2035 - - - - 5.254 LCAC 145 2028 Mar 2028 Mar 2030 Jun 2033 Jul 2035 Aug 2035 Dec 2035 5.254 Jun 2036 - - - - 5.359 LCAC 146 2028 Mar 2028 Jun 2030 Sep 2033 Jul 2035 Oct 2035 5.359 Feb 2036 Jun 2036 - - - - 5.359 LCAC 147 2029 Mar 2029 Sep 2030 Dec 2033 Feb 2036 5.359 Mar 2036 Jul 2036 Jan 2037 - - - - 5.359 LCAC 148 2029 Mar 2029 Dec 2030 Mar 2034 5.359 Feb 2036 May 2036 Sep 2036 Jan 2037 - - - - 5.359 LCAC 149 2029 Mar 2029 Mar 2031 5.359 Jun 2034 Sep 2036 Oct 2036 Jan 2037 Aug 2037 - - - - 5.466 LCAC 150 2029 Mar 2029 5.466 Jun 2031 Sep 2034 Sep 2036 Dec 2036 Mar 2037 Aug 2037 - - - - 5.466 LCAC 151 2030 5.466 Mar 2030 Sep 2031 Dec 2034 Apr 2037 May 2037 Aug 2037 Mar 2038 - - - - 5.466 LCAC 152 5.466 2030 Mar 2030 Dec 2031 Mar 2035 Apr 2037 Jul 2037 Oct 2037 Mar 2038 - - - - 5.466 LCAC 5.466 153 2030 Mar 2030 Mar 2032 Jun 2035 Nov 2037 Dec 2037 Mar 2038 Oct 2038 - - - - 5.576 5.576 LCAC 154 2030 Mar 2030 Jun 2032 Sep 2035 Nov 2037 Feb 2038 May 2038 Oct 2038 - - - - 5.576 5.576 LCAC 155 2031 Mar 2031 Sep 2032 Dec 2035 Jun 2038 Jul 2038 Oct 2038 May 2039 - - - - 5.576 5.576 LCAC 156 2031 Mar 2031 Dec 2032 Mar 2036 Jun 2038 Sep 2038 Dec 2038 May 2039 - - - - 5.576 5.576 LCAC 157 2031 Mar 2031 Mar 2033 Jun 2036 Jan 2039 Feb 2039 May 2039 Dec 2039 - - - - 5.687 5.687 LCAC 158 2031 Mar 2031 Jun 2033 Sep 2036 Jan 2039 Apr 2039 Jul 2039 Dec 2039 - - - - 5.687 5.687 LCAC Total 5.074 9.877 13.794 19.800 184.328 232.873 Full Funding TOA - Post Delivery Total 654.157 362.130 586.204 485.418 6,376.204 8,464.113 Ship Class LI 5110 - Outfitting Navy UNCLASSIFIED Page 13 of 13 Prior Years P-1 Line #36 Total Volume 1 - 409 === page 460 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 410 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Less Cost To Complete ($ in Millions) Less Previously Appropriated RDT&E,N ($ in Millions) Prior Years FY 2025 FY 2027 Base FY 2026 FY 2027 OOC 32 3 2 4 3,170.594 480.000 320.000 733.895 - FY 2027 Total 0.000 FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 4 4 4 4 4 15 72 733.895 733.059 733.159 733.101 733.268 2,884.197 10,521.273 - - - - - - - - - - 121.619 - - - - - - - - - - 121.619 - 23.700 - - - - - - - - - - 23.700 Net Procurement (P-1) ($ in Millions) 3,025.275 480.000 320.000 733.895 0.000 733.895 733.059 733.159 733.101 733.268 2,884.197 10,375.954 Full Funding TOA ($ in Millions) 3,025.275 480.000 320.000 733.895 - 733.895 733.059 733.159 733.101 733.268 2,884.197 10,375.954 Plus CY Advance Procurement ($ in Millions) Plus Cost To Complete ($ in Millions) Plus Previously Appropriated RDT&E,N ($ in Millions) Total Obligation Authority ($ in Millions) - - - - - - - - - - - 58.100 48.039 15.480 - - - - - - - - 121.619 23.700 - - - - - - - - - - 23.700 3,107.075 528.039 335.480 733.895 0.000 733.895 733.059 733.159 733.101 733.268 2,884.197 - 10,521.273 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 100.403 11.932 17.536 24.014 - 24.014 20.252 24.208 25.050 25.552 119.405 368.352 3,207.478 539.971 353.016 757.909 - 757.909 753.311 757.367 758.151 758.820 3,003.602 10,889.625 99.081 160.000 160.000 183.474 - 183.474 183.265 183.290 183.275 183.317 192.280 146.129 Description: The Ship-to-Shore Connector (SSC), also known as the LCAC 100 class, is the direct, one-for-one replacement for the U.S. Navy's aging fleet of Landing Craft, Air Cushion (LCAC) vehicles, which have an average age of 32 years and began reaching their extended service life in 2015. It will replace legacy LCAC capacity in enabling the rapid response of the Amphibious Ready Group and Marine Expeditionary Unit operations. The SSC is an aluminum air-cushion vehicle (hovercraft) designed to enhance the Navy and Marine Corps' capability to execute a broad spectrum of missions from humanitarian assistance to major combat. Its primary role is to efficiently transport weapon systems, equipment, cargo, and personnel of the Marine Air/Ground Task Force. As a high-speed, amphibious craft, it projects power by being fully compatible with all allied amphibious ships, while performing assaults and operational maneuvers from ship to shore and across the beach. The FY 2026 spend plan for SSC program includes $335,480 thousand and quantity of 2 of discretionary funding and $239,095 thousand and quantity of 1 of mandatory (reconciliation) funding for a total of $574,575 thousand and quantity of 3. LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 1 of 8 P-1 Line #37 Volume 1 - 411 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Aluminum 91.8 ft 48.3 ft 180.57 metric tons N/A Production Status: Systems: Hull, Mechanical, and Electrical (HM&E) -MT7 Engines, Skirt & Composite Components LCAC 116 LCAC 117 LCAC 118 LCAC 119 LCAC 120 LCAC 121 LCAC 122 72 months 51 months Apr 2026 Jul 2027 Jun 2028 74 months 48 months Jun 2026 Jul 2027 Jun 2028 77 months 45 months Sep 2026 Jul 2027 Jun 2028 80 months 43 months Dec 2026 Feb 2028 Jan 2029 83 months 42 months Mar 2027 Feb 2028 Jan 2029 86 months 41 months Jun 2027 Sep 2028 Aug 2029 89 months 41 months Sep 2027 Sep 2028 Aug 2029 LCAC 123 LCAC 124 LCAC 125 LCAC 126 LCAC 127 LCAC 128 LCAC 129 92 months 40 months Dec 2027 Apr 2029 Feb 2030 40 months 40 months Mar 2028 Apr 2029 Feb 2030 43 months 39 months Jun 2028 Oct 2029 Sep 2030 46 months 39 months Sep 2028 Oct 2029 Sep 2030 49 months 39 months Dec 2028 May 2030 Apr 2031 52 months 39 months Mar 2029 May 2030 Apr 2031 55 months 39 months Jun 2029 Dec 2030 Nov 2031 LCAC 130 LCAC 131 LCAC 132 LCAC 133 LCAC 134 LCAC 135 LCAC 137 58 months 39 months Sep 2029 Dec 2030 Nov 2031 61 months 39 months Dec 2029 Jul 2031 Jun 2032 64 months 39 months Mar 2030 Jul 2031 Jun 2032 60 months 39 months Jun 2030 Feb 2032 Jan 2033 63 months 39 months Sep 2030 Feb 2032 Jan 2033 66 months 39 months Dec 2030 Sep 2032 Aug 2033 57 months 39 months Jun 2031 Mar 2033 Feb 2034 Production Status: LCAC 138 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Sep 2026 LCAC 136 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date LI 5112 - Ship to Shore Connector Navy Apr 2020 Apr 2020 Nov 2024 60 months 39 months Sep 2031 Mar 2033 Feb 2034 Apr 2020 Apr 2020 Nov 2024 Nov 2024 Nov 2024 Nov 2024 (1) Apr 2020 Nov 2024 Jun 2025 Apr 2020 Nov 2024 Jun 2025 Apr 2020 Nov 2024 Jun 2025 LCAC 139 LCAC 140 LCAC 141 LCAC 142 Nov 2025 Mar 2027 Mar 2027 Mar 2027 Mar 2027 64 months 39 months Mar 2031 Sep 2032 Aug 2033 57 months 39 months Dec 2031 Oct 2033 Sep 2034 60 months 39 months Mar 2032 Oct 2033 Sep 2034 63 months 39 months Jun 2032 Jun 2034 May 2035 66 months 39 months Sep 2032 Jun 2034 May 2035 UNCLASSIFIED Page 2 of 8 P-1 Line #37 Apr 2020 Nov 2024 Sep 2026 Volume 1 - 412 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design Apr 2008 May 2009 Contract Design May 2009 Jul 2010 Detail Design Jul 2012 Sep 2014 Request for Proposals May 2011 Jul 2012 Design Agent NAVSEA/TEXTRON,INC Reissue Reissue Complete / Response Classification of Cost Estimate: Justification: The FY 2027 request is for four SSC Craft and maintains a consistent production line based on delivery rate of four craft per year. The program subsequently received a Congressionally funded increase of $320M in FY 2026 to procure two additional craft. Footnotes: (1) Reconciliation Ship LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 3 of 8 P-1 Line #37 Volume 1 - 413 === page 464 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Cost Categories (†) indicates the presence of a P-8a Plan Costs FY 2018 Qty FY 2019 Total Cost (Each) ($ M) 7 Basic Construction/Conversion Qty FY 2020 Total Cost (Each) ($ M) 6 Qty FY 2022 Total Cost (Each) ($ M) 1 Qty FY 2023 Total Cost (Each) ($ M) 2 Qty FY 2024 Total Cost (Each) ($ M) 3 Qty FY 2025 Total Cost (Each) ($ M) 4 Qty FY 2026 Total Cost (Each) ($ M) 3 Qty Total Cost (Each) ($ M) 2 471.079 370.838 50.800 256.487 323.322 428.706 355.656 230.660 Change Orders 7.398 13.819 0.898 6.412 8.083 10.718 8.892 5.766 Electronics 34.525 9.877 0.056 8.000 11.400 15.200 11.742 9.358 61.170 103.057 13.246 52.470 76.920 101.540 81.434 55.341 Hull, Mechanical, and Electrical (HM&E) (†) Ordnance Other Cost 6.854 59.109 - 68.469 34.808 28.836 22.276 18.875 Total Ship Estimate 581.026 556.700 65.000 391.838 454.533 585.000 480.000 320.000 Less Cost to Complete FY 2024 43.600 - - - - - - - Less Cost to Complete FY 2025 14.694 33.345 - - - - - - Less Cost to Complete FY 2026 Net P-1 Funding LI 5112 - Ship to Shore Connector Navy 522.732 15.480 - 507.875 65.000 391.838 UNCLASSIFIED Page 4 of 8 - - 454.533 P-1 Line #37 585.000 480.000 320.000 Volume 1 - 414 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 (†) P-1 Line Item Number / Title: 5112 / Ship to Shore Connector FY 2027 Cost Categories Qty indicates the presence of a P-8a Total Cost (Each) Plan Costs ($ M) 4 Basic Construction/Conversion 537.058 Change Orders 16.112 Electronics Hull, Mechanical, and Electrical (HM&E) 17.595 (†) 117.089 Ordnance Other Cost 46.041 Total Ship Estimate 733.895 Less Cost to Complete FY 2024 - Less Cost to Complete FY 2025 - Less Cost to Complete FY 2026 - Net P-1 Funding 733.895 Remarks: The FY 2026 Total Ship Estimate does not show $239,095 thousand and quantity of one funded in FY 2026 mandatory funding. LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 5 of 8 P-1 Line #37 Volume 1 - 415 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction LCAC 116 TEXTRON, INC 2018 Apr 2020 Jan 2022 Apr 2026 LCAC 117 TEXTRON, INC 2019 Apr 2020 Jun 2022 Jun 2026 LCAC 118 TEXTRON, INC 2019 Apr 2020 Dec 2022 Sep 2026 LCAC 119 TEXTRON, INC 2019 Apr 2020 May 2023 Dec 2026 LCAC 120 TEXTRON, INC 2019 Apr 2020 Sep 2023 Mar 2027 LCAC 121 TEXTRON, INC 2019 Apr 2020 Jan 2024 Jun 2027 LCAC 122 TEXTRON, INC 2019 Apr 2020 Apr 2024 Sep 2027 LCAC 123 TEXTRON, INC 2020 Apr 2020 Aug 2024 Dec 2027 LCAC 124 TEXTRON, INC 2022 Nov 2024 Nov 2024 Mar 2028 LCAC 125 TEXTRON, INC 2022 Nov 2024 Mar 2025 Jun 2028 LCAC 126 TEXTRON, INC 2023 Nov 2024 Jun 2025 Sep 2028 LCAC 127 TEXTRON, INC 2023 Nov 2024 Sep 2025 Dec 2028 LCAC 128 TEXTRON, INC 2023 Nov 2024 Dec 2025 Mar 2029 LCAC 129 TEXTRON, INC 2024 Nov 2024 Mar 2026 Jun 2029 LCAC 130 TEXTRON, INC 2024 Nov 2024 Jun 2026 Sep 2029 LCAC 131 TEXTRON, INC 2024 Nov 2024 Sep 2026 Dec 2029 LCAC 132 TEXTRON, INC 2024 Nov 2024 Dec 2026 Mar 2030 LCAC 133 TEXTRON, INC 2025 Jun 2025 Mar 2027 Jun 2030 LCAC 134 TEXTRON, INC 2025 Jun 2025 Jun 2027 Sep 2030 LCAC 135 TEXTRON, INC 2025 Jun 2025 Sep 2027 Dec 2030 LCAC 137 TEXTRON, INC 2026 Sep 2026 Mar 2028 Jun 2031 LCAC 138 TEXTRON, INC 2026 Sep 2026 Jun 2028 Sep 2031 TEXTRON, INC 2026 Nov 2025 Dec 2027 Mar 2031 LCAC 139 TBD 2027 Mar 2027 Sep 2028 Dec 2031 LCAC 140 TBD 2027 Mar 2027 Dec 2028 Mar 2032 LCAC 141 TBD 2027 Mar 2027 Mar 2029 Jun 2032 LCAC 142 TBD 2027 Mar 2027 Jun 2029 Sep 2032 LCAC 143 TBD 2028 Mar 2028 Sep 2029 Dec 2032 LCAC 144 TBD 2028 Mar 2028 Dec 2029 Mar 2033 LCAC 145 TBD 2028 Mar 2028 Mar 2030 Jun 2033 LCAC 146 TBD 2028 Mar 2028 Jun 2030 Sep 2033 LCAC 147 TBD 2029 Mar 2029 Sep 2030 Dec 2033 LCAC 148 TBD 2029 Mar 2029 Dec 2030 Mar 2034 LCAC 136 (1) LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 6 of 8 P-1 Line #37 Delivery Date Volume 1 - 416 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction LCAC 149 TBD 2029 Mar 2029 Mar 2031 Delivery Date Jun 2034 LCAC 150 TBD 2029 Mar 2029 Jun 2031 Sep 2034 LCAC 151 TBD 2030 Mar 2030 Sep 2031 Dec 2034 LCAC 152 TBD 2030 Mar 2030 Dec 2031 Mar 2035 LCAC 153 TBD 2030 Mar 2030 Mar 2032 Jun 2035 LCAC 154 TBD 2030 Mar 2030 Jun 2032 Sep 2035 LCAC 155 TBD 2031 Mar 2031 Sep 2032 Dec 2035 LCAC 156 TBD 2031 Mar 2031 Dec 2032 Mar 2036 LCAC 157 TBD 2031 Mar 2031 Mar 2033 Jun 2036 LCAC 158 TBD 2031 Mar 2031 Jun 2033 Sep 2036 Footnotes: (1) Reconciliation Ship LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 7 of 8 P-1 Line #37 Volume 1 - 417 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy P-1 Line Item Number / Title: 5112 / Ship to Shore Connector Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2025 Hull, Mechanical, and Electrical (HM&E) Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) Major Items MT7 Engines, Skirt & Composite Components 12 72.934 8 48.339 16 105.380 Ship Design and Engineering Services 6.645 6.000 SUPSHIP Material/Services 1.855 1.002 9.367 2.342 Major Items Subtotal 81.434 55.341 117.089 Total Hull, Mechanical, and Electrical (HM&E) 81.434 55.341 117.089 Remarks: Total quantity refers to procurement of MT7 engines with 4 engines per craft LI 5112 - Ship to Shore Connector Navy UNCLASSIFIED Page 8 of 8 P-1 Line #37 Volume 1 - 418 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5113 / Service Craft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 73 815.844 815.844 815.844 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 41.426 41.426 41.426 174.602 174.602 174.602 177.079 0.000 - 177.079 - 177.079 0.000 - 177.079 - 177.079 0.000 177.079 37.044 37.044 37.044 104.977 104.977 104.977 98.954 98.954 98.954 To FY 2031 Complete 100.983 100.983 100.983 Total - 73 - 1,550.909 - 1,550.909 - 1,550.909 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) 3.000 - Total ($ in Millions) 818.844 41.426 Gross/Weapon System Unit Cost ($ in Millions) 11.176 - 174.602 - - - 177.079 - - 177.079 - - 37.044 - 104.977 - 98.954 - 100.983 - - 3.000 - 1,553.909 - 13.143 Description: The Department of Defense Appropriations Act, 2023 moved the FY 2023 requested Auxiliary Personnel Lighter (APL) from the Service Craft line item (SCN 5113) to a new line item, now SCN 5114, Auxiliary Personnel Lighter. FY 2022 and prior year APL craft are shown in the Service Craft budget line item 5113. The US Navy owns and operates 347 Service Craft consisting of 33 different classes of craft at 56 different commands and activities throughout the world. Service Craft provide critical support to carriers, submarines, and other Navy vessels through port operations, ship maintenance, testing, and training missions. Nearly half of the Service Craft inventory is over 40 years of age. The Service Craft budget supports the acquisition of replacement craft as follows: Auxiliary Floating Dry Dock Medium (AFDM) is used to dry dock surface ships (including CG, DDG, LCS, and LSD) in order to perform maintenance availabilities. Harbor Tug (YT) provides critical vessel towing, escort, personnel transfer, and emergency services to carriers, ships, and submarines. The YT program replaces aging YTB tugboats in the Northwest Region, Yokosuka, and Portsmouth Naval Shipyard and is required to meet port operations mission requirements. Small Harbor Tug (YTL) is used by port operations for ship assist, towing, and escort of smaller Navy ships and craft. Fuel Oil Barge (YON) carries liquid petroleum products for refueling ships. YON barges greatly reduce the risk of a major fuel oil spill. Many existing YONs are 50 to 60 years old and of single hull construction. The new YONs will be double-hulled and will meet the requirements of the Oil Pollution Act of 1990 (OPA-90). Waste Oil Barge (YWO) offloads oily waste water from ships for transport and processing. The YWO will be double-hulled and have piping and other systems specifically designed for transferring oily waste. The YWO program will replace 66 to 78 year old barges that were not specifically designed to transport oily waste and are in extremely poor condition. Covered Lighter (YFN) transports ordnance and sensitive equipment, and cargo that requires protection from the weather. Open Lighter (YC) transports cargo/equipment and serves as a work platform for ship maintenance. LI 5113 - Service Craft Navy UNCLASSIFIED Page 1 of 9 P-1 Line #38 Volume 1 - 419 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5113 / Service Craft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Repair, Berthing and Messing Barge (YRBM) provides crew messing, duty crew berthing, and administrative spaces for small to mid-size ships and submarines during CNO maintenance availabilities. The new YRBM barges will augment legacy YR, YRB, YRBM, and YRBM(L) barges that are 50-80 years old, not built to current safety standards, and is not dual gender configured. Diving Tender (YDT) serves a training platforms for Navy Divers. The craft is capable of performing salvage operations and supports surface-supplied diving and life support infrastructure. LI 5113 - Service Craft Navy UNCLASSIFIED Page 2 of 9 P-1 Line #38 Volume 1 - 420 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5113 / Service Craft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery LIDelivery 5113 Service Craft Date Completion Of Fitting Out Navy Obligation Work Limit Date Hull Various Multiple Craft Various Various Various Various Various Various Various Various YON 343 YON 341 YON 344 YON 342 YC 1687 AFDM 15 YC 1688 40 months 21 months Jan 2027 Apr 2027 Mar 2028 36 months 25 months Jun 2026 Sep 2026 Aug 2027 37 months 21 months Jan 2027 Mar 2027 Feb 2028 36 months 18 months Jun 2026 Sep 2026 Aug 2027 12 months 9 months Aug 2026 Nov 2026 Oct 2027 58 months 46 months Apr 2027 Jul 2027 Jun 2028 12 months 7 months Aug 2026 Nov 2026 Oct 2027 YC 1689 YC 1690 YRBM 61 YRBM 62 YRBM 63 YRBM 64 YRBM 65 12 months 7 months Dec 2026 Mar 2027 Feb 2028 12 months 7 months Dec 2026 Mar 2027 Feb 2028 36 months 29 months Jun 2026 Sep 2026 Aug 2027 25 months 23 months Apr 2026 Jul 2026 Jun 2027 28 months 23 months Oct 2026 Jan 2027 Dec 2027 31 months 10 months Feb 2027 May 2027 Apr 2028 24 months 19 months Mar 2027 Jun 2027 May 2028 YC 2501 YRBM 66 YC 2502 YC 2503 YC 2504 YRBM 2602 YRBM 2603 13 months 11 months May 2027 Aug 2027 Jul 2028 29 months 24 months Nov 2027 Feb 2028 Jan 2029 17 months 12 months Sep 2027 Dec 2027 Nov 2028 22 months 14 months Feb 2028 May 2028 Apr 2029 27 months 16 months Jul 2028 Oct 2028 Sep 2029 26 months 20 months Jan 2029 Apr 2029 Mar 2030 32 months 20 months Jul 2029 Oct 2029 Sep 2030 YRBM 2604 YRBM 2605 YRBM 67 YFN 2701 YRBM 2701 YRBM 2702 YTL 2701 26 months 20 months Mar 2029 Jun 2029 May 2030 32 months 20 months Sep 2029 Dec 2029 Nov 2030 26 months 23 months Apr 2028 Jul 2028 Jun 2029 8 months 7 months Nov 2027 Feb 2028 Jan 2029 34 months 20 months Jan 2030 Apr 2030 Mar 2031 36 months 20 months Mar 2030 Jun 2030 May 2031 15 months 12 months Jul 2028 Oct 2028 Sep 2029 YON 2701 YON 2702 YWO 2701 YDT 2701 YDT 2702 17 months 12 months Sep 2028 Dec 2028 Nov 2029 20 months 13 months Dec 2028 Mar 2029 Feb 2030 17 months 27 months Dec 2028 Page 3 of 9 Nov 2029 Dec 2029 Nov 2030 30 months 18 months Dec 2029 Mar P-12030 Line #38 Feb 2031 Sep 2023 Dec 2025 Apr 2026 Jan 2027 Apr 2027 Jun 2023 Dec 2025 Jun 2025 Jan 2027 Apr 2027 Dec 2023 Jun 2023 Apr 2026 Feb 2026 Apr 2027 Jun 2023 Mar 2024 Apr 2026 Mar 2027 Jun 2027 12 months 18 months UNCLASSIFIED Sep 2028 Sep 2029 Aug 2025 Jun 2024 Apr 2026 Mar 2027 Jun 2022 Jul 2024 Nov 2026 Mar 2027 Aug 2025 Mar 2025 Nov 2026 Apr 2027 Jun 2027 Volume 1 - 421 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5113 / Service Craft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Justification: The FY 2027 request includes two Repair, Berthing and Messing Barges (YRBM), two Fuel Oil Barges (YON), one Covered Lighter (YFN), one Small Harbor Tug (YTL), one Waste Oil Barge (YWO) and two Diving Tender Craft (YDT). LI 5113 - Service Craft Navy UNCLASSIFIED Page 4 of 9 P-1 Line #38 Volume 1 - 422 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5113 / Service Craft Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2019 Cost Categories Plan Costs Qty FY 2020 Total Cost (Each) ($ M) 4 Qty FY 2021 Total Cost (Each) ($ M) 4 Qty FY 2022 Total Cost (Each) ($ M) 7 Qty FY 2023 Total Cost (Each) ($ M) 5 Qty FY 2024 Total Cost (Each) ($ M) 1 Qty FY 2025 Total Cost (Each) ($ M) 4 Qty FY 2026 Total Cost (Each) ($ M) 5 Qty Total Cost (Each) ($ M) 5 Basic Construction/Conversion 70.202 55.161 217.563 68.103 22.201 87.615 39.269 159.958 Change Orders 0.500 0.528 21.335 0.678 0.610 3.600 0.943 5.364 Hull, Mechanical, and Electrical (HM&E) 1.360 0.600 5.249 0.600 0.815 2.600 1.214 9.280 Total Ship Estimate 72.062 56.289 244.147 69.381 23.626 93.815 41.426 174.602 Net P-1 Funding 72.062 56.289 244.147 69.381 23.626 93.815 41.426 174.602 LI 5113 - Service Craft Navy UNCLASSIFIED Page 5 of 9 P-1 Line #38 Volume 1 - 423 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5113 / Service Craft FY 2027 Qty Cost Categories Total Cost (Each) Plan Costs ($ M) 9 Basic Construction/Conversion 166.306 Change Orders 4.049 Hull, Mechanical, and Electrical (HM&E) 6.724 Total Ship Estimate 177.079 Net P-1 Funding 177.079 Remarks: FY 2019 Craft: 1 APL: $39.808 1 YT: $13.660 2 YON: $10.174 YTL Sunk Cost: $8.420 TOTAL: $72.062 FY 2020 Craft: 3 YON: $16.382 1 APL: $39.907 TOTAL: $56.289 FY 2021 Craft: 1 APL: $41.104 1 AFDM: $155.000 1 YON: $6.084 2 YC: $5.763 1 YRBM: $22.000 1 YTL: $14.196 TOTAL: $244.147 FY 2022 Craft: 2 YC: $3.837 3 YRBM: $65.544 TOTAL: $69.381 FY 2023 Craft: 1 YRBM: $23.626 TOTAL: $23.626 FY 2024 Craft: 4 YRBM: $93.815 Total: $93.815 LI 5113 - Service Craft Navy UNCLASSIFIED Page 6 of 9 P-1 Line #38 Volume 1 - 424 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5113 / Service Craft FY 2025 Craft: 1 YRBM: $30.000 4 YC: $11.426 Total: $41.426 FY 2026 Craft: 5 YRBM: $174.602 Total: $174.602 FY 2027 Craft: 2 YRBM: $66.359 2 YON: $10.628 1 YFN: $3.331 1 YTL: $16.958 1 YWO: $5.203 2 YDT: $74.600 Total: $177.079 LI 5113 - Service Craft Navy UNCLASSIFIED Page 7 of 9 P-1 Line #38 Volume 1 - 425 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5113 / Service Craft Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date YON 343 Sterling Shipyard 2019 Sep 2023 Apr 2025 Jan 2027 YON 341 Sterling Shipyard 2020 Jun 2023 May 2024 Jun 2026 YON 344 Sterling Shipyard 2020 Dec 2023 Apr 2025 Jan 2027 YON 342 Sterling Shipyard 2021 Jun 2023 Dec 2024 Jun 2026 YC 1687 Snow and Company, Inc. 2021 Aug 2025 Nov 2025 Aug 2026 AFDM 15 AUSTAL USA, LLC 2021 Jun 2022 Jun 2023 Apr 2027 YC 1688 Snow and Company, Inc. 2021 Aug 2025 Jan 2026 Aug 2026 YC 1689 St. John's Shipbuilding 2022 Dec 2025 May 2026 Dec 2026 YC 1690 St. John's Shipbuilding 2022 Dec 2025 May 2026 Dec 2026 YRBM 61 Conrad Shipyard, LLC 2023 Jun 2023 Jan 2024 Jun 2026 YRBM 62 Conrad Shipyard, LLC 2024 Mar 2024 May 2024 Apr 2026 YRBM 63 Conrad Shipyard, LLC 2024 Jun 2024 Nov 2024 Oct 2026 YRBM 64 Conrad Shipyard, LLC 2024 Jul 2024 Apr 2026 Feb 2027 YRBM 65 Conrad Shipyard, LLC 2024 Mar 2025 Aug 2025 Mar 2027 YC 2501 TBD 2025 Apr 2026 Jun 2026 May 2027 YRBM 66 Conrad Shipyard, LLC 2025 Jun 2025 Nov 2025 Nov 2027 YC 2502 TBD 2025 Apr 2026 Sep 2026 Sep 2027 YC 2503 TBD 2025 Apr 2026 Dec 2026 Feb 2028 YC 2504 TBD 2025 Apr 2026 Mar 2027 Jul 2028 YRBM 2602 TBD 2026 Nov 2026 May 2027 Jan 2029 YRBM 2603 TBD 2026 Nov 2026 Nov 2027 Jul 2029 YRBM 2604 TBD 2026 Jan 2027 Jul 2027 Mar 2029 YRBM 2605 TBD 2026 Jan 2027 Jan 2028 Sep 2029 YRBM 67 Conrad Shipyard, LLC 2026 Feb 2026 May 2026 Apr 2028 YFN 2701 TBD 2027 Mar 2027 Apr 2027 Nov 2027 YRBM 2701 TBD 2027 Mar 2027 May 2028 Jan 2030 YRBM 2702 TBD 2027 Mar 2027 Jul 2028 Mar 2030 YTL 2701 TBD 2027 Apr 2027 Jul 2027 Jul 2028 YON 2701 TBD 2027 Apr 2027 Sep 2027 Sep 2028 YON 2702 TBD 2027 Apr 2027 Nov 2027 Dec 2028 YWO 2701 TBD 2027 Apr 2027 Sep 2027 Sep 2028 YDT 2701 TBD 2027 Jun 2027 Mar 2028 Sep 2029 YDT 2702 TBD 2027 Jun 2027 Jun 2028 Dec 2029 LI 5113 - Service Craft Navy UNCLASSIFIED Page 8 of 9 P-1 Line #38 Volume 1 - 426 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5113 / Service Craft Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date YC 2801 TBD 2028 Apr 2028 Jul 2028 Apr 2029 YON 2801 TBD 2028 Apr 2028 Jul 2028 Jul 2029 YON 2802 TBD 2028 Apr 2028 Sep 2028 Sep 2029 YON 2803 TBD 2028 Apr 2028 Nov 2028 Nov 2029 YTL 2801 TBD 2028 Apr 2028 Aug 2028 Aug 2029 YFN 2901 TBD 2029 Mar 2029 Apr 2029 Nov 2029 YRBM 2901 TBD 2029 Mar 2029 Jul 2029 Nov 2030 YRBM 2902 TBD 2029 Mar 2029 Nov 2029 Feb 2031 YWO 2901 TBD 2029 Apr 2029 Jul 2029 Apr 2030 YON 2901 TBD 2029 Apr 2029 Jul 2029 Apr 2030 YTL 2901 TBD 2029 Apr 2029 Aug 2029 Aug 2030 YON 2902 TBD 2029 Apr 2029 Oct 2029 Oct 2030 YFN 3001 TBD 2030 Mar 2030 Apr 2030 Nov 2030 YRBM 3001 TBD 2030 Apr 2030 Oct 2030 Feb 2032 YRBM 3002 TBD 2030 Apr 2030 Dec 2030 Apr 2032 YWO 3001 TBD 2030 Apr 2030 Jul 2030 Apr 2031 YON 3001 TBD 2030 Apr 2030 Jul 2030 Jul 2031 YTL 3001 TBD 2030 Apr 2030 Aug 2030 Aug 2031 Oct 2031 YON 3002 TBD 2030 Apr 2030 Oct 2030 YRBM 3101 TBD 2031 Mar 2031 Jul 2031 Jul 2033 YRBM 3102 TBD 2031 Aug 2031 Jan 2032 Dec 2033 YON 3101 TBD 2031 Jul 2031 May 2032 Mar 2033 YC/YCV 3102 TBD 2031 Aug 2031 Oct 2032 Aug 2033 YTL 3101 TBD 2031 May 2031 Mar 2032 Sep 2033 YC/YCV 3101 TBD 2031 Aug 2031 Jun 2032 Apr 2033 YSR 3101 TBD 2031 Jul 2031 May 2032 Sep 2033 LI 5113 - Service Craft Navy UNCLASSIFIED Page 9 of 9 P-1 Line #38 Volume 1 - 427 === page 478 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 428 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 5114 / Auxiliary Personnel Lighter Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Prior Years Resource Summary Procurement Quantity (Units in Each) 2 Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 143.218 143.218 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 143.218 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 2 76.168 79.000 83.000 0.000 83.000 83.088 83.732 86.218 87.942 - 722.366 - - - - - - - - - - 76.168 79.000 83.000 0.000 83.000 83.088 83.732 86.218 87.942 - Total 722.366 - - - - - - - - - - 76.168 79.000 83.000 0.000 83.000 83.088 83.732 86.218 87.942 - 722.366 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) 143.218 76.168 79.000 83.000 - 83.000 83.088 83.732 86.218 87.942 - 722.366 Gross/Weapon System Unit Cost ($ in Millions) 71.609 - - - - - - - - - - 80.263 Description: Auxiliary Personnel Lighter (Small) - APL(S) barracks craft provide berthing and messing facilities for sailors while their ships are in port for availabilities and inter-deployment training cycles. It supports up to an aircraft carrier (CVN) size ship where it is designed to provide berthing for up to 600 personnel and messing for up to 1,130 personnel. APL(S) facilities include classrooms, conference rooms, administrative offices, disbursing office, galley, mess, scullery, post office, convenience store, barbershop, lounges, laundry facilities, physical fitness center, chaplain's office, medical complex, quarterdeck, equipment/ machinery rooms, and various storerooms. Lastly, it provides berthing and sanitary facilities designed for dual-gender use. Characteristics: Length Overall Beam Displacement Draft APL 269 ft 69 ft 3315 MT 8 ft Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date APL 73 APL 2501 APL 2601 APL 2701 33 months 31 months Jun 2027 Sep 2027 Aug 2028 42 months 30 months Dec 2029 Mar 2030 Feb 2031 43 months 30 months Jun 2030 Sep 2030 Aug 2031 44 months 32 months Feb 2031 May 2031 Apr 2032 Sep 2024 Jun 2026 Nov 2026 Jun 2027 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A LI 5114 - Auxiliary Personnel Lighter Navy UNCLASSIFIED Page 1 of 4 Reissue P-1 Line #39 Reissue Complete / Response Volume 1 - 429 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5114 / Auxiliary Personnel Lighter Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Design Schedule Start / Issue Complete / Response Contract Design N/A N/A Detail Design N/A N/A Request for Proposals N/A N/A Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Justification: FY 2027 requests 1 APL barracks craft. LI 5114 - Auxiliary Personnel Lighter Navy UNCLASSIFIED Page 2 of 4 P-1 Line #39 Volume 1 - 430 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5114 / Auxiliary Personnel Lighter Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2023 Cost Categories Plan Costs Qty FY 2024 Total Cost (Each) ($ M) 1 Qty FY 2025 Total Cost (Each) ($ M) Qty (Each) 1 FY 2026 Total Cost Qty ($ M) (Each) 1 FY 2027 Total Cost ($ M) 1 Qty Total Cost (Each) ($ M) 1 Basic Construction/Conversion 68.000 69.607 73.083 76.300 79.690 Change Orders 2.418 1.593 2.285 1.100 1.710 Hull, Mechanical, and Electrical (HM&E) 0.800 0.800 0.800 1.600 1.600 Total Ship Estimate 71.218 72.000 76.168 79.000 83.000 Net P-1 Funding 71.218 72.000 76.168 79.000 83.000 LI 5114 - Auxiliary Personnel Lighter Navy UNCLASSIFIED Page 3 of 4 P-1 Line #39 Volume 1 - 431 === page 482 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5114 / Auxiliary Personnel Lighter Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction APL 73 Bollinger Mississippi Shipbuilding LLC 2024 Sep 2024 Nov 2024 Jun 2027 APL 2501 TBD 2025 Jun 2026 Jun 2027 Dec 2029 APL 2601 TBD 2026 Nov 2026 Dec 2027 Jun 2030 APL 2701 TBD 2027 Jun 2027 Jun 2028 Feb 2031 APL 2801 TBD 2028 Apr 2028 Apr 2029 Oct 2031 APL 2901 TBD 2029 Mar 2029 Dec 2029 Feb 2032 APL 3001 TBD 2030 Mar 2030 Sep 2030 Sep 2032 APL 3101 TBD 2031 Apr 2031 Oct 2031 Oct 2033 LI 5114 - Auxiliary Personnel Lighter Navy UNCLASSIFIED Page 4 of 4 P-1 Line #39 Delivery Date Volume 1 - 432 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC 1 450.000 450.000 450.000 FY 2027 Total 0.000 0.000 0.000 FY 2028 FY 2029 1 1 450.000 450.000 450.000 450.000 450.000 450.000 0.000 0.000 0.000 To FY 2031 Complete FY 2030 Total 1 2 5 10 450.000 900.000 2,250.000 4,500.000 450.000 - 900.000 - 2,250.000 4,500.000 - - 450.000 900.000 2,250.000 4,500.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) - - - 450.000 - 450.000 450.000 - 450.000 900.000 2,250.000 4,500.000 Gross/Weapon System Unit Cost ($ in Millions) - - - 450.000 - 450.000 450.000 - 450.000 450.000 450.000 450.000 Description: The Bulk Fuel Vessel (T-AOT) program will procure tankers to support the transportation and distribution of bulk petroleum products in support of U.S. Navy and joint force operations. These tankers will operate under the Military Sealift Command (MSC) to transport fuel from shore-based facilities to forward operating areas and provide at-sea fuel transfer capability in support of fleet logistics operations. The tankers will augment the Navy's existing fleet oiler force by providing additional capacity to move fuel forward and sustain naval forces operating at extended distances from established logistics hubs. The tankers will be capable of supporting consolidated replenishment (CONSOL) operations, enabling commercial or logistics tankers to transfer fuel to fleet oilers at sea. This capability allows fleet oilers to remain on station for longer periods and continue conducting underway replenishment operations to support combatant ships, rather than returning to port to reload fuel. By enabling oilers to remain forward deployed, the program increases the endurance and operational reach of naval forces. The Bulk Fuel Vessel program supports the Navy's distributed maritime operations concept by strengthening the logistics network required to sustain forces across large operating areas, particularly in the IndoPacific region. The tankers will provide additional fuel transport capacity, improve operational flexibility, and enhance the resilience of the Navy's logistics force by reducing reliance on fixed infrastructure and enabling greater integration with partner nation logistics capabilities. The Department of the Navy intends to explore foreign shipbuilding opportunities for the FY27 and FY28 ships. LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 1 of 6 P-1 Line #40 Volume 1 - 433 === page 484 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft - Production Status: Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date T-AOT 2701 Aug 2027 32 months 26 months Apr 2030 Jul 2030 Jun 2031 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals Oct 2026 Mar 2027 Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Justification: The Bulk Fuel Vessel (T-AOT) program is a new start that establishes the procurement baseline to increase Military Sealift Command's capacity to transport and distribute bulk fuel in support of fleet logistics operations. The program leverages an existing commercial tanker design, reducing non-recurring engineering and enabling a more efficient acquisition timeline. LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 2 of 6 P-1 Line #40 Volume 1 - 434 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 (†) FY 2027 Cost Categories Qty indicates the presence of a P-8a Plan Costs ($ M) 1 Basic Construction/Conversion 5.345 (†) Hull, Mechanical, and Electrical (HM&E) 13.000 419.897 Change Orders Electronics Total Cost (Each) 5.903 (†) 5.855 Total Ship Estimate 450.000 Net P-1 Funding 450.000 Remarks: The Department of the Navy intends to explore foreign shipbuilding opportunities for the FY27 Ship. LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 3 of 6 P-1 Line #40 Volume 1 - 435 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date T-AOT 2701 TBD 2027 Aug 2027 Feb 2028 Apr 2030 T-AOT 2801 TBD 2028 Feb 2028 Aug 2028 Oct 2030 T-AOT 3001 TBD 2030 Feb 2030 Aug 2030 Oct 2032 T-AOT 3101 TBD 2031 Feb 2031 Aug 2031 Oct 2033 T-AOT 3102 TBD 2031 Feb 2031 Aug 2031 Oct 2033 LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 4 of 6 P-1 Line #40 Volume 1 - 436 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel FY 2027 Qty Electronics (Each) Total Cost ($ M) Other Cost Elements Minor Systems 5.903 Other Cost Elements Subtotal 5.903 Total Electronics 5.903 LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 5 of 6 P-1 Line #40 Volume 1 - 437 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-8a, Analysis of Ship Cost Estimates: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 P-1 Line Item Number / Title: 5118 / Bulk Fuel Vessel FY 2027 Qty Hull, Mechanical, and Electrical (HM&E) (Each) Total Cost ($ M) Major Items Engineering and Logistics Support Services 5.855 Major Items Subtotal 5.855 Total Hull, Mechanical, and Electrical (HM&E) 5.855 LI 5118 - Bulk Fuel Vessel Navy UNCLASSIFIED Page 6 of 6 P-1 Line #40 Volume 1 - 438 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5139 / LCAC SLEP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Prior Years FY 2025 FY 2026 FY 2027 Base 74 2 Gross/Weapon System Cost ($ in Millions) 1,544.165 45.087 0.000 37.998 Less PY Advance Procurement ($ in Millions) 27.900 - - Less Cost To Complete ($ in Millions) 14.000 - - - - Less Hurricane ($ in Millions) 19.800 Less Transfer ($ in Millions) 1.500 Less Subsequent Year Full Funding ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus Subsequent Year Full Funding ($ in Millions) Full Funding TOA ($ in Millions) 1,480.965 - - FY 2027 OOC 2 FY 2027 Total - FY 2028 To FY 2031 Complete FY 2029 FY 2030 - - - - Total 80 2 2 0.000 37.998 38.949 0.000 0.000 0.000 - 1,666.199 - - - - - - - - 27.900 - - - - - - - - 14.000 - - - - - - - - - 0.000 - - - - - - - - - - 19.800 - - - - - - - - - - 1.500 45.087 0.000 37.998 0.000 37.998 38.949 0.000 0.000 0.000 - 1,602.999 - - - - - - - - - - 0.000 1,480.965 45.087 - 37.998 - 37.998 38.949 - - - - 1,602.999 Plus CY Advance Procurement ($ in Millions) 27.900 - - - - - - - - - - 27.900 Plus Cost To Complete ($ in Millions) 14.000 - - - - - - - - - - 14.000 Plus Transfer ($ in Millions) 1.500 - - - - - - - - - - 1.500 Plus Hurricane ($ in Millions) 19.800 - - - - - - - - - - 19.800 1,544.165 45.087 0.000 37.998 0.000 37.998 38.949 0.000 0.000 0.000 - 1,666.199 Total Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Plus Outfitting and Post Delivery ($ in Millions) Total ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 15.085 - 0.493 0.523 - 0.523 0.520 0.530 - - 1.023 18.174 1,559.250 45.087 0.493 38.521 - 38.521 39.469 0.530 - - 1.023 1,684.373 20.867 22.544 - 18.999 - 18.999 19.475 - - - - 20.827 Description: LCAC transports weapon systems, equipment, cargo and personnel of the assault elements of the Marine Air/Ground Task Force from ship to shore and across the beach. The LCAC Service Life Extension Program (SLEP) and LCAC Extended Service Life Extension Program (ESLEP) extends the craft service life past the original twenty years. The LCAC SLEP program incorporates the following modifications and enhancements: upgrade from the TF40B engines to the ETF40B engines; repair corrosion damage; replace obsolete electronics; upgrade C4N suite; and replace deep skirt. The LCAC SLEP program was completed in March 2022 with the delivery of LCAC SLEP 77. The LCAC ESLEP program incorporates the following modifications and enhancements: repairs corrosion damage; replaces obsolete electronics, upgrades C4N including cyber hardening; and replaces the deep skirt. The FY 2026 spend plan for LCAC ESLEP included $0 thousand of discretionary and $37,390 thousand of mandatory (reconciliation) and a quantity of one for a total of $37,390 thousand and a quantity of one. LI 5139 - LCAC SLEP Navy UNCLASSIFIED Page 1 of 4 P-1 Line #43 Volume 1 - 439 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5139 / LCAC SLEP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft Air Cushion 91.8 ft (on cushion) 49.2 ft (on cushion) 106 tons None (air cushion) Production Status: LCAC ESLEP 76 LCAC ESLEP 79 LCAC ESLEP 73 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Jun 2024 Apr 2025 Apr 2025 29 months 20 months Nov 2026 Dec 2026 Nov 2027 30 months 19 months Oct 2027 Nov 2027 Oct 2028 24 months 19 months Apr 2027 May 2027 Apr 2028 (1) LCAC ESLEP 57 LCAC ESLEP 78 Jun 2026 Jan 2027 Jan 2027 23 months 20 months May 2028 Jun 2028 May 2029 23 months 20 months Dec 2028 Jan 2029 Dec 2029 30 months 20 months Jul 2029 Aug 2029 Jul 2030 LCAC ESLEP 65 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals May 2020 Jul 2020 Design Agent Landing Craft Planning Yard Reissue Reissue Complete / Response Classification of Cost Estimate: N/A Justification: FY27 requests the necessary funds to procure two E-SLEP craft. Footnotes: (1) Reconciliation Ship LI 5139 - LCAC SLEP Navy UNCLASSIFIED Page 2 of 4 P-1 Line #43 Volume 1 - 440 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5139 / LCAC SLEP Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2024 Cost Categories Plan Costs Qty FY 2025 Total Cost (Each) ($ M) 1 Qty FY 2026 Total Cost (Each) ($ M) 2 Qty FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) 0 ($ M) 2 Basic Construction/Conversion 8.502 25.269 - Electronics 0.651 4.764 - 21.842 1.516 Hull, Mechanical, and Electrical (HM&E) 5.483 14.124 - 13.341 Other Cost 0.650 0.930 - 1.299 Total Ship Estimate 15.286 45.087 - 37.998 Net P-1 Funding 15.286 45.087 - 37.998 Remarks: The FY 2026 Total Ship Estimate does not show $37,390 thousand and quantity of one funded in FY 2026 mandatory funding. LI 5139 - LCAC SLEP Navy UNCLASSIFIED Page 3 of 4 P-1 Line #43 Volume 1 - 441 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5139 / LCAC SLEP Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCAC ESLEP 76 Walashek 2024 Jun 2024 Mar 2025 Nov 2026 LCAC ESLEP 79 Walashek 2025 Apr 2025 Mar 2026 Oct 2027 LCAC ESLEP 73 Walashek 2025 Apr 2025 Sep 2025 Apr 2027 TBD 2026 Jun 2026 Sep 2026 May 2028 LCAC ESLEP 57 TBD 2027 Jan 2027 Apr 2027 Dec 2028 LCAC ESLEP 78 TBD 2027 Jan 2027 Nov 2027 Jul 2029 LCAC ESLEP 43 TBD 2028 Jan 2028 Jun 2028 Feb 2030 LCAC ESLEP 52 TBD 2028 Jan 2028 Oct 2028 Jun 2030 LCAC ESLEP 65 (1) Footnotes: (1) Reconciliation Ship LI 5139 - LCAC SLEP Navy UNCLASSIFIED Page 4 of 4 P-1 Line #43 Volume 1 - 442 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5201 / Auxiliary Vessels (Used Sealift) Program Elements for Code B Items: 0208036N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 7 2 2 634.908 204.939 290.000 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 634.908 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 634.908 204.939 204.939 290.000 290.000 FY 2027 Base FY 2027 OOC FY 2027 Total - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2028 1 130.000 130.000 130.000 To FY 2031 Complete FY 2029 FY 2030 - - - - 12 0.000 0.000 0.000 - 1,259.847 - - - - 0.000 0.000 0.000 - Total 1,259.847 - - - - 0.000 0.000 0.000 - 1,259.847 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Total ($ in Millions) 634.908 204.939 290.000 - - - 130.000 - - - - 1,259.847 Gross/Weapon System Unit Cost ($ in Millions) 90.701 102.470 145.000 - - - 130.000 - - - - 104.987 Description: This funding is required to recapitalize the U.S. surge sealift fleet. The principal enabler for recapitalizing the U.S. surge sealift fleet is through ship procurements and upgrades of used commercial vessels via the Ready Reserve Force (RRF) Recapitalization program. Strategic sealift is a key enabler of U.S. power projection and supports the afloat movement of equipment and supplies for major ground combat operations. During surge deployments, approximately 90% of Marine Corps and Army combat equipment is transported by sea, under the operation of U.S. Transportation Command (USTRANSCOM). The RRF, managed by the U.S. Department of Transportation's (DOT) Maritime Administration (MARAD), is the primary force of the surge sealift fleet. As a key element of strategic sealift, the RRF is specifically structured to transport military unit equipment and supplies during the initial surge of U.S. combat forces deploying anywhere in the world. This fleet consists of 43 government-owned ships with an average age of 41 years; a majority of these ships have already exceeded their expected service life, limiting their supportability and adding significant risk to their operational readiness. As a result, the Joint Force requires 18 ships over the next 5 years to replace anticipated sealift capacity losses. In FY 2023, the Navy purchased three FY 2022 funded used vessels. These vessels have all been delivered, completed post-delivery modification, outfitting and sea trials, and were ready for tasking beginning in the third quarter of FY 2024. These three vessels provide 660 thousand square feet of capacity to the RRF. In FY 2024, the Navy purchased one FY 2023 funded used vessel, and one FY24 funded used vessel. These vessels were delivered to MARAD in December 2024 and are in the process of completing postdelivery modifications and regulatory overhauls. These two vessels are sister ships of the three purchased in FY 2023 and will complete post-delivery modification, outfitting and sea trials and be ready for tasking beginning in the first quarter of FY 2026. These two vessels will provide an additional 440 thousand square feet of capacity to the RRF. MARAD has identified up to 14 more vessels to purchase FY 2025-FY2027 funds, two of which are sister ships of the most recently purchased FY 2024 vessels. The Navy, along with MARAD has already conducted on-site surveys of additional classes of ships and with the FY26 programmed funding and FY27 request, will engage with sellers for additional on-site surveys development of business case analysis to inform purchase decisions. MARAD anticipates the purchase of the next vessels to occur by Q3FY26. The FY 2027 request for Auxiliary Vessels (Used) Sealift program includes $0 and quantity of 0 of discretionary and $130,000 thousand and quantity of 1 of mandatory funding for a total of $130,000 thousand and quantity of 1. The mandatory funds support the purchase of one used vessel in support of recapitalization of the Ready Reserve Force. LI 5201 - Auxiliary Vessels (Used Sealift) Navy UNCLASSIFIED Page 1 of 4 P-1 Line #44 Volume 1 - 443 === page 494 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5201 / Auxiliary Vessels (Used Sealift) Program Elements for Code B Items: 0208036N Other Related Program Elements: N/A AUX 2701 Line Item MDAP/MAIS Code: N/A Characteristics: Length Overall Beam Displacement Draft 850 ft 136 ft 38 ft - Production Status: AUX 2501 AUX 2502 AUX 2601 AUX 2602 Contract Award Date Months to Completion a) Award to Delivery b) Construction Start to Delivery Delivery Date Completion Of Fitting Out Obligation Work Limit Date Jul 2026 Aug 2026 Mar 2027 May 2027 6 months 6 months Jan 2027 7 months 7 months Mar 2027 7 months 7 months Oct 2027 7 months 7 months Dec 2027 Design Schedule Start / Issue Complete / Response Issue Date for TLR N/A N/A Issue Date for TLS N/A N/A Preliminary Design N/A N/A Contract Design N/A N/A Detail Design N/A N/A Request for Proposals N/A N/A (1) Nov 2027 6 months 6 months May 2028 Reissue Reissue Complete / Response Design Agent Classification of Cost Estimate: Footnotes: (1) Reconciliation Ship LI 5201 - Auxiliary Vessels (Used Sealift) Navy UNCLASSIFIED Page 2 of 4 P-1 Line #44 Volume 1 - 444 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-5c, Ship Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5201 / Auxiliary Vessels (Used Sealift) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 FY 2025 Cost Categories Qty FY 2026 Total Cost (Each) Qty ($ M) FY 2027 Total Cost (Each) Qty ($ M) Total Cost (Each) ($ M) Plan Costs Basic Construction/Conversion 2 204.939 2 290.000 0 - Change Orders Electronics Technology Insertion Propulsion Equipment Hull, Mechanical, and Electrical (HM&E) Ordnance Total Ship Estimate 204.939 290.000 - Net P-1 Funding 204.939 290.000 - Remarks: The FY 2027 Total Ship Estimate is funded with $0 thousand of FY 2027 discretionary funding and $130,000 thousand of FY 2027 mandatory funding for a total of $130,000 thousand and a quantity of 1. LI 5201 - Auxiliary Vessels (Used Sealift) Navy UNCLASSIFIED Page 3 of 4 P-1 Line #44 Volume 1 - 445 === page 496 === UNCLASSIFIED Date: April 2026 Exhibit P-27, Ship Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5201 / Auxiliary Vessels (Used Sealift) Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 Ship Shipbuilder Fiscal Year Contract Award Start of Construction AUX 2501 Crowley 2025 Jul 2026 Jul 2026 Jan 2027 AUX 2502 Crowley 2025 Aug 2026 Aug 2026 Mar 2027 AUX 2601 TBD 2026 Mar 2027 Mar 2027 Oct 2027 AUX 2602 TBD 2026 May 2027 May 2027 Dec 2027 TBD 2027 Nov 2027 Nov 2027 May 2028 TBD 2028 May 2028 May 2028 Dec 2028 AUX 2701 (1) AUX 2801 Delivery Date Footnotes: (1) Reconciliation Ship LI 5201 - Auxiliary Vessels (Used Sealift) Navy UNCLASSIFIED Page 4 of 4 P-1 Line #44 Volume 1 - 446 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) 2,611.990 2,611.990 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - LPD 17 Class ($ in Millions) - - - - - - - - - - - 0.000 LPD 17 FLT II ($ in Millions) - - - 67.507 - - - 331.900 TAGS Class ($ in Millions) - - - - - - - - - - - 0.000 TAGOS Class ($ in Millions) - - - - - - - - - - - 0.000 ESB ($ in Millions) - - - 12.100 - 12.100 - - - - - 12.100 SSN ($ in Millions) - - - 605.375 - 605.375 - 3,664.872 LCS ($ in Millions) - - - 9.450 - 9.450 CVN RCOH ($ in Millions) - - - 379.200 - 379.200 CVN ($ in Millions) - - - 324.000 - 324.000 - EPF ($ in Millions) - - - 8.423 - 8.423 7.500 DDG-51 ($ in Millions) - - - 178.224 - 178.224 340.120 286.375 264.749 LHA ($ in Millions) - - - 164.300 - 164.300 18.900 - 46.900 LCAC ($ in Millions) - - - - - - TAO Fleet Oiler ($ in Millions) - - - 241.501 10.881 7.079 - 103.489 241.501 - 103.489 - - - 160.904 376.720 253.700 1,108.900 1,259.129 671.667 1,006.002 902.210 - 8,991.542 - 1,853.300 - - 0.000 2,261.121 - 1,006.002 - 2,611.990 - 1,259.129 Total 0.000 0.000 - 1,853.300 - - 2,611.990 - 2,261.121 - 0.000 Net Procurement (P-1) ($ in Millions) - 0.000 To FY 2031 Complete - 8,991.542 - - - - 9.450 - - - - 632.900 - - - - 324.000 6.400 6.500 - - 28.823 - 1,173.260 - - 230.100 - - 0.000 - - 259.461 - - 2,324.676 - 8,991.542 Columbia Class Submarine ($ in Millions) - - - 585.928 - 585.928 1,092.396 377.039 269.313 Total Obligation Authority ($ in Millions) 0.000 0.000 0.000 2,611.990 0.000 2,611.990 2,261.121 1,853.300 1,259.129 103.792 1,006.002 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - Total ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Millions) - - - 2,611.990 - - 2,611.990 - - 2,261.121 - 1,853.300 - 1,259.129 - 1,006.002 - - 8,991.542 - Description: Note: Section 8072 of the Department of Defense Appropriations Act, 2026 directs that of the funds appropriated in Completion of Prior Shipbuilding Programs, Shipbuilding and Conversion, Navy, of this act shall be available to fund prior year shipbuilding cost increases as specified in the general provision. LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 1 of 7 P-1 Line #45 Volume 1 - 447 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / [2013] SSN Virginia Class]: Funds in FY 2027 are for the Government responsible portion of the shipbuilding construction contract overruns for FY 2018 SSN 800/SSN 801 ($44.2M) and FY 2019 SSN 802/ SSN 803 ($561.1M). [P5 / [2127] Littoral Combat Ship (LCS)]: Funds in FY 2027 are for LCS 31 Water Jet Repairs ($9.5M). [P5 / [2001] CVN - Carrier Replacement]: Funds in FY 2027 support CVN 79 Advanced Arresting Gear (AAG) testing, associated delay and disruption, time related services, and continued Advanced Weapons Elevator (AWE) work, wage and overtime increases, surge in manning to support sea trials and preliminary acceptance and additional outside engineering and vendor support to provide a more complete ship at delivery ($324.0M). [P5 / [2086] CVN RCOH]: Funds in FY 2027 are for CVN 74 cost growth and time related charges due to an additional 5 month delivery delay ($379.2M). [P5 / [3043] EPF]: Funds in FY 2027 HM&E and Other categories support programmatic expenses, including Government-Furnished Equipment management, test and trials support, and government oversight (both headquarters and waterfront) for EPF 16 ($3.2M) and EMS 1 ($5.2M). [P5 / [2122] DDG-51]: Funds in FY 2027 are for the Government responsible portion of shipbuilding construction contract overruns for DDG 126 ($24.5M), DDG 128/129 ($69.9), and DDG 131 ($83.8). [P5 / [3010] LPD 17 FLT II]: Funds in FY 2027 support additional LPD 30 costs for an air conditioning plant ($16.0M), Degaussing System ($26.0M), increased coverage to Navigational Radar ($16.0M), and additional stowage ($0.8M); additional LPD 31 costs for air conditioning plant ($12.0M), Degaussing System ($22.0M), Economic Price Adjustment ($7.3M), CANES Compatible Tablets ($2.6M), and additional stowage ($0.8M). [P5 / [3039] Expeditionary Sea Base (ESB 8)]: Funds in FY 2027 are for the Government portion of the shipbuilding construction contract overrun, Economic Price Adjustment of ESB 8, and contract close-out costs associated with the last in class ship for ESB 8 ($12.1M). [P5 / [3041] LHA (R)]: Funds in FY 2027 are for the Government Responsible portion of the shipbuilding construction contract overrun for LHA 8 ($124.0M), for LHA 8 Economic Price Adjustment ($12.4M), for LHA 8 Deferred Work changes ($20.0M) and for the resolution of DOT&E operational assessment capabilities for LHA 8 ($7.9M). [P5 / [5025] TAO Fleet Oiler]: Funds in FY 2027 are for the Economic Price Adjustment for (FY 2020 ship) T-AO 210 ($16.0M), the Government responsible portion of the shipbuilding construction contract overrun and Economic Price Adjustment for (FY 2022 ships) T-AO 211 and T-AO 212 ($127.0M), the Government responsible portion of the shipbuilding construction contract overrun and Economic Price Adjustment for (FY 2023 ship) T-AO 213 ($23.1M), the Economic Price Adjustment for (FY 2024 ship) T-AO 214 ($1.2M), and to finance change orders, electronics, and HM&E requirements for (FY 2026 ship) TAO 217 ($74.2M). [P5 / [1045] SSBN Columbia Class]: Funds in FY 2027 are for the Government responsible portion of the shipbuilding construction contract overrun and Government Furnished Equipment increases for SSBN 826 ($566.5M) and SSBN 827 ($19.4M). LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 2 of 7 P-1 Line #45 Volume 1 - 448 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1611N: Shipbuilding and Conversion, Navy / BA 05: Auxiliaries, Craft, and PriorYear Program Costs / BSA 1: Auxiliaries, Craft and Prior Yr Program Cost ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Ship Estimate - / 0.000 - / 0.000 - / 0.000 - / 2,611.990 - / 0.000 - / 2,611.990 P-40 Total Gross/Weapon System Cost - / 0.000 - / 0.000 - / 0.000 - / 2,611.990 - / 0.000 - / 2,611.990 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 3 of 7 P-1 Line #45 Volume 1 - 449 === page 500 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: Ship Estimate MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC - - 2,611.990 FY 2027 Total - 0.000 - 2,611.990 - 2,611.990 - 0.000 - 2,611.990 - 2,611.990 - 0.000 2,611.990 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Completion of PY Shipbuilding Programs - [2013] SSN Virginia Class Cost 1.1) Govt portion of shipbuilding contract overrun for SSN 800/SSN 801 - - - - - - - - - - - 44.244 - - - - - 44.244 1.2) Govt portion of shipbuilding contract overrun SSN 802/SSN 803 - - - - - - - - - - - 561.131 - - - - - 561.131 Subtotal: Completion of PY Shipbuilding Programs [2013] SSN Virginia Class Cost - - - - - - - - - - - 605.375 - - - - - 605.375 Completion of PY Shipbuilding Programs - [2127] Littoral Combat Ship (LCS) Cost 2.1) LCS 31 Water Jet Repairs - - - - - - - - - - - 9.450 - - - - - 9.450 Subtotal: Completion of PY Shipbuilding Programs [2127] Littoral Combat Ship (LCS) Cost - - - - - - - - - - - 9.450 - - - - - 9.450 Completion of PY Shipbuilding Programs - [2001] CVN - Carrier Replacement Cost 3.1) Complete AAG testing/certify/AWE/ support wage/overtime/ manning/surge trials & acceptance - - - - - - - - - - - 324.000 - - - - - 324.000 Subtotal: Completion of PY Shipbuilding Programs - - - - - - - - - - - 324.000 - - - - - 324.000 LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 4 of 7 P-1 Line #45 Volume 1 - 450 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: Ship Estimate MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - [2001] CVN - Carrier Replacement Cost Completion of PY Shipbuilding Programs - [2086] CVN RCOH Cost 4.1) Cost growth & time related charges for CVN 74 due to delivery delays - - - - - - - - - - - 379.200 - - - - - 379.200 Subtotal: Completion of PY Shipbuilding Programs [2086] CVN RCOH Cost - - - - - - - - - - - 379.200 - - - - - 379.200 Completion of PY Shipbuilding Programs - [3043] EPF Cost 5.1) Additional HM&E and Other Costs for EPF 16 - - - - - - - - - - - 3.223 - - - - - 3.223 5.2) Additional HM&E and Other Costs for EMS 1 - - - - - - - - - - - 5.200 - - - - - 5.200 - - - - - - - - - - - 8.423 - - - - - 8.423 Subtotal: Completion of PY Shipbuilding Programs [3043] EPF Cost Completion of PY Shipbuilding Programs - [2122] DDG-51 Cost 6.1) Govt portion of shipbuilding contract overrun for DDG 126 - - - - - - - - - - - 24.503 - - - - - 24.503 6.2) Govt portion of shipbuilding contract overrun for DDG 128/129 - - - - - - - - - - - 69.919 - - - - - 69.919 6.3) Govt portion of ship ctr overrun, GFE increases, Bridge Mods DDG 130/131/132 - - - - - - - - - - - 83.802 - - - - - 83.802 Subtotal: Completion of PY Shipbuilding Programs [2122] DDG-51 Cost - - - - - - - - - - - 178.224 - - - - - 178.224 Completion of PY Shipbuilding Programs - [3010] LPD 17 FLT II Cost 7.1) LPD 30 Additional costs A/C Plant/ Degaussing Sys/ Navigation Radar/ Additional Stowage - - - - - - - - - - - 58.800 - - - - - 58.800 7.2) LPD 31 Additional costs A/C Plant/ Degaussing Sys/ Additional Stowage/ CANES - - - - - - - - - - - 37.400 - - - - - 37.400 7.5) Economic Price Adjustment for LPD 31 - - - - - - - - - - - 7.289 - - - - - 7.289 LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 5 of 7 P-1 Line #45 Volume 1 - 451 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: Ship Estimate MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Completion of PY Shipbuilding Programs [3010] LPD 17 FLT II Cost Unit Cost ($ M) - FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - 103.489 - - - - - 103.489 Completion of PY Shipbuilding Programs - [3039] Expeditionary Sea Base (ESB 8) Cost 8.1) Govt portion shipbuild. contract overrun, Econ. Price Adjust., cont. close-out costs ESB 8 - - - - - - - - - - - 12.100 - - - - - 12.100 Subtotal: Completion of PY Shipbuilding Programs [3039] Expeditionary Sea Base (ESB 8) Cost - - - - - - - - - - - 12.100 - - - - - 12.100 Completion of PY Shipbuilding Programs - [3041] LHA (R) Cost 10.1) Govt portion of shipbuilding contract overrun LHA 8 - - - - - - - - - - - 124.000 - - - - - 124.000 10.2) Economic Price Adjustment for LHA 8 - - - - - - - - - - - 12.400 - - - - - 12.400 10.3) Deferred Work Changes for LHA 8 - - - - - - - - - - - 20.000 - - - - - 20.000 10.4) Resolution of DOT&E operational assessment capabilities for LHA 8 - - - - - - - - - - - 7.900 - - - - - 7.900 Subtotal: Completion of PY Shipbuilding Programs [3041] LHA (R) Cost - - - - - - - - - - - 164.300 - - - - - 164.300 Completion of PY Shipbuilding Programs - [5025] TAO Fleet Oiler Cost 12.1) Economic price adjustment for T-AO 210 - - - - - - - - - - - 16.020 - - - - - 16.020 12.2) Govt portion of shipbuilding contract overrun & economic price adjustment for T-AO 211/212 - - - - - - - - - - - 127.000 - - - - - 127.000 12.3) Govt portion of shipbuilding contract overrun and economic price adjustment for T-AO 213 - - - - - - - - - - - 23.100 - - - - - 23.100 12.4) Economic price adjustment for T-AO 214 - - - - - - - - - - - 1.181 - - - - - 1.181 LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 6 of 7 P-1 Line #45 Volume 1 - 452 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5300 / Completion of PY Shpbldg Progr Appropriation / Budget Activity / Budget Sub Activity: 1611N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: Ship Estimate MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 12.6) Finance change orders, electronics, and HM&E requirements TAO 217 - - - - - - - - - - - 74.200 - - - - - 74.200 Subtotal: Completion of PY Shipbuilding Programs [5025] TAO Fleet Oiler Cost - - - - - - - - - - - 241.501 - - - - - 241.501 Completion of PY Shipbuilding Programs - [1045] SSBN Columbia Class Cost 13.1) Government share of shipbuilding contract overrun and GFE increases SSBN 826 - - - - - - - - - - - 566.542 - - - - - 566.542 13.2) Government share of shipbuilding contract overrun and GFE increases SSBN 827 - - - - - - - - - - - 19.386 - - - - - 19.386 Subtotal: Completion of PY Shipbuilding Programs - [1045] SSBN Columbia Class Cost - - - - - - - - - - - 585.928 - - - - - 585.928 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 2,611.990 - - 0.000 - - 2,611.990 LI 5300 - Completion of PY Shpbldg Progr Navy UNCLASSIFIED Page 7 of 7 P-1 Line #45 Volume 1 - 453 === page 504 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 454