=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 1 of 1 Procurement of Ammo, Navy & MC UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Navy.................................................................................................................................................................................... Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Cost of Report............................................................................................................................................................. Volume 1 - v Introduction and Explanation of Contents..............................................................................................................Volume 1 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - ix Line Item Table of Contents (by Appropriation then Line Number).................................................................... Volume 1 - xxi Line Item Table of Contents (Alphabetically by Line Item Title)........................................................................ Volume 1 - xxiii Executive Summary.................................................................................................................................................Volume 1 - xxv Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === PANMC The estimated cost of this report for the Department of the Navy (DON) is $32,175. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === Department of Defense Appropriations Act, 2027 Procurement of Ammunition, Navy and Marine Corps For construction, procurement, production, and modification of ammunition, and accessories therefor; specialized equipment and training devices; expansion of public and private plants, including ammunition facilities, authorized by section 2854 of title 10, United States Code, and the land necessary therefor, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $1,958,597,000 to remain available for obligation until September 30, 2029. Volume 1 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary Apr 2026 (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total 1,877,446 1,098,630 247,000 1,345,630 Total Department of the Navy 1,877,446 1,098,630 247,000 1,345,630 Grand Total Department of War 1,877,446 1,098,630 247,000 1,345,630 Appropriation Summary FY 2025 Actuals Procurement of Ammunition, Navy and Marine Corps UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary Apr 2026 (Dollars in Thousands) Appropriation Summary FY 2027 Discretionary Request Procurement of Ammunition, Navy and Marine Corps FY 2027 Mandatory Request FY 2027 Total 1,958,597 1,958,597 Total Department of the Navy 1,958,597 1,958,597 Grand Total Department of War 1,958,597 1,958,597 UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary Apr 2026 (Dollars in Thousands) Appropriation Summary FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total 1,877,446 1,098,630 247,000 1,345,630 1,877,446 1,098,630 247,000 1,345,630 FY 2025 Actuals Procurement of Ammunition, Navy and Marine Corps Total Department of the Navy UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary Apr 2026 (Dollars in Thousands) Appropriation Summary FY 2027 Discretionary Request Procurement of Ammunition, Navy and Marine Corps Total Department of the Navy UNCLASSIFIED FY 2027 Mandatory Request FY 2027 Total 1,958,597 1,958,597 1,958,597 1,958,597 Volume 1 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Budget Activity Summary Apr 2026 (Dollars in Thousands) Appropriation: Procurement of Ammunition, Navy and Marine Corps FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total 571,916 247,000 818,916 247,000 1,345,630 Budget Activity 01. Procurement of Ammunition, Navy 1,198,168 02. Ammunition, Marine Corps Total Procurement of Ammunition, Navy and Marine Corps UNCLASSIFIED 679,278 526,714 1,877,446 1,098,630 526,714 Volume 1 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Budget Activity Summary Apr 2026 (Dollars in Thousands) Appropriation: Procurement of Ammunition, Navy and Marine Corps FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Procurement of Ammunition, Navy 02. Ammunition, Marine Corps Total Procurement of Ammunition, Navy and Marine Corps UNCLASSIFIED 841,605 841,605 1,116,992 1,116,992 1,958,597 1,958,597 Volume 1 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Procurement of Ammunition, Navy Navy Ammunition 1 General Purpose Bombs A U 24,038 2 JDAM B U 3 Airborne Rockets, All Types A U 57,179 78,884 78,884 4 Machine Gun Ammunition A U 11,331 17,101 17,101 5 Practice Bombs A U 33,964 43,659 43,659 6 Cartridges & Cart Actuated Devices A U 73,782 77,079 77,079 7 Air Expendable Countermeasures A U 124,208 95,398 95,398 8 JATOS A U 7,407 6,177 6,177 9 5 Inch/54 Gun Ammunition A U 21,051 24,864 24,864 858 53,533 29,961 798 UNCLASSIFIED 59,232 29,961 798 59,232 Volume 1 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Procurement of Ammunition, Navy Navy Ammunition 1 General Purpose Bombs A U 45,607 2 JDAM B U 3 Airborne Rockets, All Types A U 92,145 92,145 4 Machine Gun Ammunition A U 14,832 14,832 5 Practice Bombs A U 46,782 46,782 6 Cartridges & Cart Actuated Devices A U 63,064 63,064 7 Air Expendable Countermeasures A U 121,059 121,059 8 JATOS A U 8,179 8,179 9 5 Inch/54 Gun Ammunition A U 44,136 44,136 1,292 96,935 UNCLASSIFIED 45,607 1,292 96,935 Volume 1 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature Intermediate Caliber Gun 10 Ammunition FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals FY 2026 Total Ident Code Sec A U 34,177 38,661 38,661 Qty Cost Qty Cost Qty Cost Qty Cost 11 Other Ship Gun Ammunition A U 56,679 42,162 42,162 12 Small Arms & Landing Party Ammo A U 96,038 47,775 47,775 13 Pyrotechnic and Demolition A U 15,072 9,293 9,293 14 Cancelled Account Adjustments (87) A U 1 15 Ammunition Less Than $5 Million A U 1,703 1,670 1,670 16 Expeditionary Loitering Munitions A U 588,005 Total Procurement of Ammunition, Navy 1,198,168 571,916 128,321 141,135 247,000 247,000 247,000 818,916 Budget Activity 02: Ammunition, Marine Corps Marine Corps Ammunition 17 Mortars A U UNCLASSIFIED 141,135 Volume 1 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature Intermediate Caliber Gun 10 Ammunition FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Ident Code Sec A U 40,095 40,095 Qty Cost Qty Cost Qty Cost 11 Other Ship Gun Ammunition A U 43,106 43,106 12 Small Arms & Landing Party Ammo A U 48,801 48,801 13 Pyrotechnic and Demolition A U 9,510 9,510 14 Cancelled Account Adjustments (87) A U 15 Ammunition Less Than $5 Million A U 1,692 1,692 16 Expeditionary Loitering Munitions A U 165,662 165,662 841,605 841,605 181,464 181,464 Total Procurement of Ammunition, Navy Budget Activity 02: Ammunition, Marine Corps Marine Corps Ammunition 17 Mortars A U UNCLASSIFIED Volume 1 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 18 Direct Support Munitions A U 33,221 26,729 26,729 19 Infantry Weapons Ammunition A U 280,718 164,083 164,083 20 Combat Support Munitions A U 25,173 12,936 12,936 21 Ammo Modernization A U 17,518 18,467 18,467 22 Artillery Munitions A U 179,590 147,473 147,473 23 Items Less Than $5 Million A U Total Ammunition, Marine Corps Total Procurement of Ammunition, Navy and Marine Corps 14,737 15,891 15,891 679,278 526,714 526,714 1,877,446 1,098,630 UNCLASSIFIED 247,000 1,345,630 Volume 1 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1508N Detail Apr 2026 (Dollars in Thousands) Appropriation: 1508 Procurement of Ammunition, Navy and Marine Corps Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 18 Direct Support Munitions A U 29,715 29,715 19 Infantry Weapons Ammunition A U 142,179 142,179 20 Combat Support Munitions A U 12,510 12,510 21 Ammo Modernization A U 19,009 19,009 22 Artillery Munitions A U 723,278 723,278 23 Items Less Than $5 Million A U 8,837 8,837 Total Ammunition, Marine Corps 1,116,992 1,116,992 Total Procurement of Ammunition, Navy and Marine Corps 1,958,597 1,958,597 UNCLASSIFIED Volume 1 - xx === page 23 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1508N: Procurement of Ammo, Navy & MC Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0145 General Purpose Bombs........................................................................................................................Volume 1 - 1 2 01 01 0148 JT Direct Attack Munition (JDAM)....................................................................................................... Volume 1 - 17 3 01 01 0151 Airborne Rockets, All Types................................................................................................................ Volume 1 - 27 4 01 01 0155 Machine Gun Ammunition....................................................................................................................Volume 1 - 41 5 01 01 0160 Practice Bombs.................................................................................................................................... Volume 1 - 51 6 01 01 0180 Cartridge Actuated Devices/Propellant Act Devices............................................................................ Volume 1 - 63 7 01 01 0182 Air Expendable Countermeasures....................................................................................................... Volume 1 - 69 8 01 01 0194 Jet Assisted Take Off (JATOs)............................................................................................................ Volume 1 - 93 9 01 01 0250 5 Inch/54 Gun Ammunition................................................................................................................ Volume 1 - 103 10 01 01 0266 Intermediate Caliber Gun Ammo....................................................................................................... Volume 1 - 119 11 01 01 0270 Other Ship Gun Ammunition..............................................................................................................Volume 1 - 133 12 01 01 0335 Small Arms & Lndg Party Ammo.......................................................................................................Volume 1 - 153 13 01 01 0340 Pyrotechnic and Demolition............................................................................................................... Volume 1 - 189 15 01 01 0400 Ammunition less than $5 million........................................................................................................ Volume 1 - 209 16 01 01 1776 Expeditionary Loitering Munitions...................................................................................................... Volume 1 - 213 UNCLASSIFIED Volume 1 - xxi === page 24 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1508N: Procurement of Ammo, Navy & MC Line # BA BSA Line Item Number Line Item Title Page 17 02 01 1085 Mortars............................................................................................................................................... Volume 1 - 221 18 02 01 1125 Direct Support Munitions....................................................................................................................Volume 1 - 247 19 02 01 1350 Infantry Weapons Ammunition...........................................................................................................Volume 1 - 281 20 02 01 1550 Combat Support Munitions................................................................................................................ Volume 1 - 337 21 02 01 1630 Ammo Modernization......................................................................................................................... Volume 1 - 367 22 02 01 1650 Artillery Munitions...............................................................................................................................Volume 1 - 371 23 02 01 1660 Items less than $5 million.................................................................................................................. Volume 1 - 403 UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page 5 Inch/54 Gun Ammunition 0250 9 01 01................... Volume 1 - 103 Air Expendable Countermeasures 0182 7 01 01..................... Volume 1 - 69 Airborne Rockets, All Types 0151 3 01 01..................... Volume 1 - 27 Ammo Modernization 1630 21 02 01................... Volume 1 - 367 Ammunition less than $5 million 0400 15 01 01................... Volume 1 - 209 Artillery Munitions 1650 22 02 01................... Volume 1 - 371 Cartridge Actuated Devices/Propellant Act Devices 0180 6 01 01..................... Volume 1 - 63 Combat Support Munitions 1550 20 02 01................... Volume 1 - 337 Direct Support Munitions 1125 18 02 01................... Volume 1 - 247 Expeditionary Loitering Munitions 1776 16 01 01................... Volume 1 - 213 General Purpose Bombs 0145 1 01 01....................... Volume 1 - 1 Infantry Weapons Ammunition 1350 19 02 01................... Volume 1 - 281 Intermediate Caliber Gun Ammo 0266 10 01 01................... Volume 1 - 119 Items less than $5 million 1660 23 02 01................... Volume 1 - 403 JT Direct Attack Munition (JDAM) 0148 2 01 01..................... Volume 1 - 17 Jet Assisted Take Off (JATOs) 0194 8 01 01..................... Volume 1 - 93 Machine Gun Ammunition 0155 4 01 01..................... Volume 1 - 41 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Mortars 1085 17 02 01................... Volume 1 - 221 Other Ship Gun Ammunition 0270 11 01 01................... Volume 1 - 133 Practice Bombs 0160 5 01 01..................... Volume 1 - 51 Pyrotechnic and Demolition 0340 13 01 01................... Volume 1 - 189 Small Arms & Lndg Party Ammo 0335 12 01 01................... Volume 1 - 153 UNCLASSIFIED Volume 1 - xxiv === page 27 === Executive Summary for Procurement of Ammunition, Navy and Marine Corps Table 1: Funding Overview Discretionary Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $ 1,877,446 $ 1,098,630 $ 1,958,597 $ $ 247,000 $ $ 1,877,446 $ 1,345,630 $ 1,958,597 Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 1776 Low Cost Weapons $ $ 225,000 $ 1776 Munitions and Supply Chain $ $ 22,000 $ Mandatory Total $ $ 247,000 $ - MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Procurement of Ammunition, Navy and Marine Corps includes $1,958,597 thousand of discretionary and $0 thousand of mandatory for a total of $1,958,597 thousand. The FY 2026 spend plan for Procurement of Ammunition, Navy and Marine Corps includes $1,098,630 thousand of discretionary and $247,000 thousand of mandatory for a total of $1,345,630 thousand. Volume 1 - xxv === page 28 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0145 / General Purpose Bombs Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 2,890.636 2,890.636 2,890.636 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 24.038 29.961 45.607 0.000 45.607 49.866 50.237 45.062 - - - - - - - - 24.038 29.961 45.607 0.000 45.607 49.866 50.237 45.062 - - - - - - - - 24.038 29.961 45.607 0.000 45.607 49.866 50.237 45.062 To FY 2031 Complete 45.955 Continuing - Continuing - 45.955 Continuing - Total - Continuing - - 45.955 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The General Purpose (GP) bombs budget sustains munition component inventory levels as defined in the Navy Munitions Requirement Process (NMRP) model. This model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. The budget also procures on-going technology integration to optimize the production and capability of products within the Direct Attack Weapons (DAW) portfolio. Inventory levels fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. This variable requirement is assessed and a mean average is used to buffer out the most extreme changes. The GP Bombs Budget procures several different categories of munition components. The bomb bodies procured vary in size, construction and explosive fill to provide the desired effect when employed against their targets. The fuzes, aero components, sensors and guidance kits procured provide a variety of detonation options for optimal lethality and flight control options to deliver the weapon to its intended target. A family of fuzes, when installed into the weapon, provides a controlled initiation of the explosive fill when commanded through impact with a target or at a predetermined time. This predetermined time may occur above the ground for a detonation above the target or below the ground after impact to engage deeply buried hardened targets. A basic fixed fin stabilizes the bomb and allows the weapon to travel on a ballistic line of fall as controlled by forward movement imparted by the aircraft and gravity. Laser guided components control the fall of the bomb using movable surfaces and a laser-detecting device to guide the bomb to a location on the ground illuminated by a laser designator. There is also funding included in this budget to address a myriad of subcomponents that are used in the assembly of the various weapon configurations, including arming wires, adapters, lugs, nose plugs, aero surfaces, mechanical interfaces, cables and other components required for All Up Round (AUR) configurations. Lastly, this budget funds production engineering, integrated logistics, and product improvement efforts to sustain production and ongoing enhancements to ensure the weapons remain relevant in the environments they are used. Production Improvements funding may be used to outpace the evolving enemy threats/countermeasures to meet warfighter demand. FY2025 includes $1.436M supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). This accounts for a quantity of 8 BLU-117. This accounts for a quantity of 28 BLU-109. This accounts for a quantity of 36 FMU-139D/B. LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 1 of 16 P-1 Line #1 Volume 1 - 1 === page 30 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0145 / General Purpose Bombs Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / GP Bomb P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 2,890.636 - / 24.038 - / 29.961 - / 45.607 - / 0.000 - / 45.607 - / 2,890.636 - / 24.038 - / 29.961 - / 45.607 - / 0.000 - / 45.607 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This budget supports critical Navy Title 10 war reserve/operational, training and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and OPNAV INST 8011.9 (Navy Munitions Requirements Process). War reserve requirements support OSW-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces. Test requirements support the verification, fielding, safety and quality assurance of Navy weapons and equipment throughout their life cycle. FY 2027 baseline funding is required to meet Naval Munitions Requirements Process (NMRP) inventory requirements. This model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. FY 2027 increase of $15.6M required to qualify and field a Precision Laser Guidance Set (PLGS) Kit (GBU-55/DSU-39) and to support FMU-139D/ B Fuze inventory wholeness to increase inventory to meet Fleet requirements. The budget also procures on-going technology integration to optimize the production and capability of products within the Direct Attack Weapons (DAW) portfolio. DSU-39 Product Improvement Program (PIP) involves efforts and activities related to the Qualification and integration of DSU-39 laser sensor on the existing kit configuration. Qualification efforts to include Electromagnetic Environmental Effects (E3), Insensitive Munitions (IM), Carrier Suitability and production acceptance and test to field the product improvement. Associated systems test and evaluation cost for block software and A/C integration of DSU-39. Inventory requirements fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. This variable requirement is assessed and a mean average is used to buffer out the most extreme changes. Annual Non-Combat Expenditure Allowance (NCEA) prepares Naval Aviation units for deployment and is the largest cause of current and future General Purpose (GP) bombs procurement. Unlike procurement of capital assets, NCEA consumes GP bombs in support of Fleet readiness every year. Procurements are primarily designed to replenish the weapons used each year to achieve required readiness levels. Barring a reduction in fleet training expenditures and the correlating readiness degradation, any reductions in GP bombs procurements in a given year will have to be addressed with increased procurements in the out years to restore inventory to a level adequate to support NCEA and fleet readiness. LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 2 of 16 P-1 Line #1 Volume 1 - 2 === page 31 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / GP Bomb MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 24.038 29.961 45.607 0.000 45.607 - Gross/Weapon System Cost ($ in Millions) 2,890.636 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 2,890.636 Plus CY Advance Procurement ($ in Millions) - - - - - 24.038 29.961 45.607 0.000 45.607 - Total Obligation Authority ($ in Millions) 2,890.636 FY 2027 Total - - - - - 24.038 29.961 45.607 0.000 45.607 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Q2191 (†) (1) BLU-111 1.1.2) Q2192 (†) (2) BLU-110 1.1.3) Q2160 (†) (3) BLU-117 1.1.4) Q2011 BSU-33 (†) (4) Con Fin 1.1.5) Q2193 (†) (5) BLU-126 1.1.7) Q2195 (†) (6) BLU-109 4,281.04 14,699 62.927 6,823.03 22 0.150 6,959.49 22 0.153 7,098.68 22 0.156 - - - 7,098.68 22 0.156 7,730.84 4,098 31.681 10,692.93 20 0.214 10,906.79 20 0.218 11,124.92 20 0.222 - - - 11,124.92 20 0.222 21,352.14 585 12.491 27,612.24 49 1.353 28,176.55 40 1.127 28,740.08 65 1.868 - - - 28,740.08 65 1.868 141.59 31,366 4.441 270.00 187 0.050 275.40 108 0.030 280.91 108 0.030 - - - 280.91 108 0.030 9,963.75 1,600 15.942 11,119.67 60 0.667 11,342.05 60 0.681 11,568.89 60 0.694 - - - 11,568.89 60 0.694 39,250.00 68 2.669 39,285.71 28 1.100 - - - - - - - - - - - - - - 130.151 - - 3.534 - - 2.209 - - 2.970 - - - - - 2.970 - - 130.151 - - 3.534 - - 2.209 - - 2.970 - - - - - 2.970 11,739 148.421 - - - - - - - - - - - - - - - Subtotal: Recurring Cost Subtotal: Hardware Cost Hardware - Guided Bombs Cost Cost Recurring Cost 2.1.1) Q2200 Laser (†) Capability DSU-38 (7) 12,643.41 LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 3 of 16 P-1 Line #1 Volume 1 - 3 === page 32 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / GP Bomb MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.2) Q2210 Laser (†) Capability DSU-39 (8) - - - - - - - - - 33,000.00 321 10.593 - - - 33,000.00 321 10.593 2.1.3) Q2220 Laser (†) Capability DSU-42 12,954.60 2,533 32.814 - - - - - - - - - - - - - - - 2.1.4) Q2181 Laser Guided Bombs CCG 9,768.02 444 4.337 - - - - - - - - - - - - - - - 2.1.5) Q2187 Laser Guided Bombs AFG 3,578.15 10,115 36.193 - - - - - - - - - - - - - - - - - 15.599 - - 0.230 - - 0.235 - - 0.250 - - - - - 0.250 - - 237.364 - - 0.230 - - 0.235 - - 10.843 - - - - - 10.843 - - 4.915 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 4.915 - - - - - - - - - - - - - - - Subtotal: Hardware - Guided Bombs Cost Cost - - 242.279 - - 0.230 - - 0.235 - - 10.843 - - - - - 10.843 99,846 190.563 2,697 8.687 5,674 18.584 6,222 21.416 - - - 6,222 21.416 - - 190.563 - - 8.687 - - 18.584 - - 21.416 - - - - - 21.416 3.2.1) Q2896 FUZE Non Recurring - - 50.094 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 50.094 - - - - - - - - - - - - - - - Subtotal: Hardware - Fuzes Cost Cost - - 240.657 - - 8.687 - - 18.584 - - 21.416 - - - - - 21.416 4.1.1) Prior Years Cumulative Funding - - 2,111.675 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 2,111.675 - - - - - - - - - - - - - - - (9) 2.1.6) Q2197 Bombs Subcomponents (10) Subtotal: Recurring Cost Non Recurring Cost 2.2.1) Q2898 BLU-137 Non Recurring Hardware - Fuzes Cost Cost Recurring Cost 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) (11) Subtotal: Recurring Cost 1,908.57 3,221.00 3,275.35 3,442.00 3,442.00 Non Recurring Cost Hardware - Prior Years Cost Non Recurring Cost LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 4 of 16 P-1 Line #1 Volume 1 - 4 === page 33 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / GP Bomb MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Hardware - Prior Years Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 2,111.675 - - - - - - - - - - - - - - - 5.1) Q2800 GP Bombs - - 3.723 - - 0.260 - - 0.265 - - 0.270 - - - - - 0.270 5.2) Q2800 Guided Bombs - - 5.157 - - 0.290 - - 0.294 - - 0.300 - - - - - 0.300 5.3) Q2800 Fuzes - - 5.428 - - 0.493 - - 0.503 - - 0.513 - - - - - 0.513 Subtotal: Support Integrated Logistics Cost - - 14.308 - - 1.043 - - 1.062 - - 1.083 - - - - - 1.083 6.1) Q2830 GP Bombs - - 37.815 - - 2.077 - - 2.074 - - 2.115 - - - - - 2.115 6.2) Q2830 Guided Bombs - - 42.365 - - 1.118 - - 1.140 - - 1.101 - - - - - 1.101 6.3) Q2830 Fuzes - - 39.798 - - 2.432 - - 2.462 - - 2.382 - - - - - 2.382 - - 119.978 - - 5.627 - - 5.676 - - 5.598 - - - - - 5.598 - - 21.358 - - 4.343 - - 1.698 - - 3.190 - - - - - 3.190 - - 3.398 - - 0.148 - - 0.100 - - 0.102 - - - - - 0.102 - - 3.014 - - 0.138 - - 0.104 - - 0.106 - - - - - 0.106 Support - Integrated Logistics Cost Support - Production Engineering Cost Subtotal: Support Production Engineering Cost Support - Miscellaneous Support Cost 7.1) Q2850 Product Improvement Program (PIP) (12) 7.2) Q2892 NonStandard Items (13) 7.3) Q2893 Remanufacture Components (14) (15) - - 3.818 - - 0.288 - - 0.293 - - 0.299 - - - - - 0.299 Subtotal: Support Miscellaneous Support Cost - - 31.588 - - 4.917 - - 2.195 - - 3.697 - - - - - 3.697 Gross/Weapon System Cost - - 2,890.636 - - 24.038 - - 29.961 - - 45.607 - - 0.000 - - 45.607 7.4) Q2894 Gauging (†) indicates the presence of a P-5a Footnotes: (1) (2) Q2191 BLU-111 is a 500 lb. general purpose bomb consisting of the all components (bomb body, energetics, electronics, Insensitive munitions coatings and protective shipping equipment). Q2192 BLU-110 is a 1000 lb. general purpose bomb consisting of the all components (bomb body, energetics, electronics, Insensitive munitions coatings and protective shipping equipment). LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 5 of 16 P-1 Line #1 Volume 1 - 5 === page 34 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0145 / General Purpose Bombs ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / GP Bomb MDAP/MAIS Code: (3) Q2160 BLU-117 is a 2000 lb. general purpose bomb consisting of the all components (bomb body, energetics, electronics, Insensitive munitions coatings and protective shipping equipment). BLU-117 FY2027 quantity increase is to replenish Navy inventory levels and meet Fleet requirements. (4) (5) (6) (7) (8) Q2011 BSU-33 is a required inventory item necessary to complete end item configurations of the unguided Free Fall General Purpose Bomb. Q2193 The BLU-126 is a low collateral damage bomb consisting of the all components (bomb body, energetics, electronics, Insensitive munitions coatings and protective shipping equipment). Q2195 BLU-109 is a 2000 lb. hard target penetrator bomb consisting of the all components (bomb body, energetics, electronics, Insensitive munitions coatings and protective shipping equipment). Q2200 Laser Capability DSU-38 is the laser detector for 500lb munitions Q2210 Laser Capability DSU-39 is the laser detector for 1,000lb munitions. DSU-39 will leverage the existing family of laser detector hardware baseline production line and Technology with modifications to fit to the mold line of 1,000lb munitions. Procurement of this end item is now required, due to the USN divesting of Pave-way series of laser guided munitions. Replacement laser-guided munition in the 1,000lb category is required to avoid a capability gap. Leveraging the current GBU-32 by integrating a DSU-39 laser guidance system will provide laser capability in the 1,000lb class category. (9) Q2220 Laser Capability DSU-42 is the laser detector for 2,000lb penetrator munitions (10) Q2197 Bomb sub-components MXU-735, Lanyards, Lugs, M72; M73; M74 cables, FUZE components and accessory kits, energetics, protective shipping equipment, shipping pallets, and ULAG (Universal Low-profile Arming Generator), and miscellaneous hardware procured out of this are required for assembly of BLU-109, BLU-117, BLU-110, BLU-111, BLU-126, and BLU-137 bomb bodies into end item configuration weapons such as free fall unguided and guided bombs. (11) Q2032 FMU-139 Electronic Fuze System: is an in-line Electronic Safe And Arm Device (ESAD) fuze system that offers selection of fuze arm and functional delay times from the cockpit and is used with general purpose and penetrator bomb cases. This capability aligns with the National Defense Strategy's requirement for a more lethal force. FY27 FMU-139D/B Qty increase supports Fuze inventory wholeness to reach the Total Munitions Requirement (TMR). The unit cost increase above inflation in FY27 is driven by compounding material escalation from the supply base from the original quotation in Q4 of FY23. Being the final ordering period, it becomes the longest duration of time between original quotation of material and the actual material procurement which significantly increases the risk for higher material costs. (12) Q2850 Product Improvement Program (PIP) includes labor and materials associated with improvements to products and processes related to the production of GP Bombs, Precision guidance kits and Fuze Systems. These product areas include, but are not limited to, bomb cases, shipping caps, bomb racks, set screws, thermal coat, energetics, bomb liner and tuff seal. Universal Armament Interface (UAI) updates incorporated in the Fuze and guided bomb components. Also includes Insensitive Munitions (IM) compliance and improvements to products and processes related to the production of these products. Additionally, this cost element funds parts obsolescence, associated production acceptance and test, and ancillary support cost. FY27 increase is directly related to the qualification of DSU-39 Laser Detector. The DSU-39 is the laser detector for 1,000lb munitions. DSU-39 will leverage the existing family of laser detector hardware baseline production line and technology with modifications to fit to the mold line of 1,000lb munitions (BLU-111/MK-83). (13) Q2892 Non-Standard Items: Items procured out of this are Control Surfaces, Bands, Strakes, Aero Panels, Dunnage and Packaging required to support General Purpose Bomb All-Up-Round (AUR) configurations. (14) (15) Q2893 Remanufacture Components: funding is required for labor and materials associated with remanufacturing actions on GP Bombs and associated components. Q2894 Gauging: funding is required for materials and labor for calibration and recertification of gauges necessary to support General Purpose Bomb and Fuze production. LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 6 of 16 P-1 Line #1 Volume 1 - 6 === page 35 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements 1.1.1) Q2191 BLU-111 O O C FY Contractor and Location ✓ 2018 1.1.1) Q2191 BLU-111 1.1.1) Q2191 BLU-111 1.1.1) Q2191 BLU-111 1.1.1) Q2191 BLU-111 1.1.2) Q2192 BLU-110 1.1.2) Q2192 BLU-110 1.1.2) Q2192 BLU-110 1.1.2) Q2192 BLU-110 1.1.3) Q2160 BLU-117 ✓ 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.3) Q2160 BLU-117 1.1.4) Q2011 BSU-33 Con Fin 1.1.4) Q2011 BSU-33 Con Fin ✓ P-1 Line Item Number / Title: 0145 / General Purpose Bombs Method/Type or Funding Vehicle General Dynamics BLU-111 / Garland, TX/MCAAP 2024 Item Number / Title [DODIC]: 1 / GP Bomb Location of PCO Award Date Date of First Delivery C / FFP JMC Rock Island, IL May 2018 May 2021 4,500 5,884.16 Y Jun 2014 General Dynamics BLU-111 / Garland, TX/MCAAP C / FFP JMC Rock Island, IL May 2025 May 2028 257 6,820.30 Y Jan 2023 2025 General Dynamics BLU-111 / Garland, TX/MCAAP C / FFP JMC Rock Island, IL May 2025 May 2028 22 6,823.03 Y Jan 2023 2026 General Dynamics BLU-111 / Garland, TX/MCAAP C / FFP JMC Rock Island, IL May 2026 May 2029 22 6,959.49 Y Jan 2023 2027 General Dynamics BLU-111 / Garland, TX/MCAAP C / FFP JMC Rock Island, IL May 2027 May 2030 22 7,098.68 Y Jan 2023 2024 General Dynamics BLU-110 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jul 2025 Jul 2028 6 10,688.67 Y Jan 2023 2025 General Dynamics BLU-110 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jul 2025 Jul 2028 20 10,692.93 Y Jan 2023 2026 General Dynamics BLU-110 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jul 2026 Jul 2029 20 10,906.79 Y Jan 2023 2027 General Dynamics BLU-110 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jul 2027 Jul 2030 20 11,124.92 Y Jan 2023 2019 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jun 2019 Mar 2022 269 15,809.53 Y Jun 2014 2020 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jun 2020 Mar 2023 60 25,020.01 Y Jun 2014 2020 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jun 2020 Mar 2023 15 25,020.01 Y Jun 2014 2022 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Jun 2022 Mar 2025 162 26,030.80 Y Jun 2014 2023 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Sep 2024 Jun 2027 7 26,551.41 Y Jan 2023 2024 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Mar 2025 Dec 2027 72 27,202.43 Y Jan 2023 2025 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Mar 2025 Dec 2027 49 27,612.24 Y Jan 2023 2026 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Mar 2026 Dec 2028 40 28,176.55 Y Jan 2023 2027 General Dynamics BLU-117 / Garland TX/MCAAP C / FFP JMC Rock Island, IL Mar 2027 Dec 2029 65 28,740.08 Y Jan 2023 2025 Valor Tactical Innovation / GRAND JUNCTION, CO C / FFP JMC Rock Island, IL Apr 2025 Apr 2026 187 270.00 Y Aug 2022 2026 Valor Tactical Innovation / GRAND JUNCTION, CO C / FFP JMC Rock Island, IL Apr 2026 Apr 2027 108 275.40 Y Aug 2022 LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 7 of 16 P-1 Line #1 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 7 === page 36 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0145 / General Purpose Bombs Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / GP Bomb Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2027 Valor Tactical Innovation / GRAND JUNCTION, CO C / FFP JMC Rock Island, IL Apr 2027 Apr 2028 108 280.91 Y Aug 2022 2019 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2019 May 2022 525 9,893.33 Y Jun 2014 2019 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2019 May 2022 565 9,893.33 Y Jun 2014 2020 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2020 May 2023 49 10,079.36 Y Jun 2014 2020 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2020 May 2023 388 10,079.36 Y Jun 2014 2021 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2021 May 2024 54 10,272.86 Y Jun 2014 2021 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2021 May 2024 15 10,272.86 Y Jun 2014 2024 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2025 May 2028 4 10,901.64 Y Jan 2023 2025 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2025 May 2028 60 11,119.67 Y Jan 2023 2026 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2026 May 2029 60 11,342.05 Y Jan 2023 2027 General Dyanmics / JMC Rock Island, IL C / FFP JMC Rock Island, IL May 2027 May 2030 60 11,568.89 Y Jan 2023 2024 EllWood National Forge / Irvine, PA/MCAAP C / FFP JMC Rock Island, IL Jul 2025 Jul 2028 68 39,250.00 Y Nov 2022 2025 EllWood National Forge / Irvine, PA/MCAAP C / FFP JMC Rock Island, IL Jul 2025 Jul 2028 28 39,285.71 Y Nov 2022 2024 The Boeing Company DSU-38 / St. Charles, MO SS / FFP AFLCMC Hill AFB Mar 2025 Mar 2026 50 18,183.94 Y May 2023 2027 The Boeing Company DSU-39 / St. Charles, MO SS / FFP AFLCMC Hill AFB Mar 2027 Mar 2028 321 33,000.00 Y May 2023 2.1.3) Q2220 Laser Capability DSU-42 2023 The Boeing Company DSU-42 / St. Charles, MO SS / FFP AFLCMC Hill AFB Oct 2022 Oct 2023 295 27,199.00 Y Jan 2022 2.1.3) Q2220 Laser Capability DSU-42 2024 The Boeing Company DSU-42 / St. Charles, MO SS / FFP AFLCMC Hill AFB Jun 2024 Jun 2025 211 27,199.00 Y May 2023 1.1.4) Q2011 BSU-33 Con Fin 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 ✓ 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 ✓ 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 ✓ 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 1.1.5) Q2193 BLU-126 1.1.7) Q2195 BLU-109 1.1.7) Q2195 BLU-109 2.1.1) Q2200 Laser Capability DSU-38 2.1.2) Q2210 Laser Capability (†) DSU-39 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) ✓ (Each) 2021 NGDS (16) / ROCKET CENTER, WV SS / FFP NAVAIR, Lakehurst, NJNAVAIR, Lakehurst, NJ May 2021 Feb 2023 671 2,282.43 Y Mar 2015 2024 NGDS (16) / ROCKET CENTER, WV SS / FFP NAVAIR, Pax River, MDNAVAIR, Pax River, MD Sep 2024 Sep 2025 4,037 3,335.89 Y Nov 2023 LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 8 of 16 P-1 Line #1 Volume 1 - 8 === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) 3.1.1) Q2032 FMU-139 Electronic Fuze System (†) (†) O O C FY P-1 Line Item Number / Title: 0145 / General Purpose Bombs Contractor and Location Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 1 / GP Bomb Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 2025 NGDS (16) / ROCKET CENTER, WV SS / FFP NAVAIR, Pax River, MDNAVAIR, Pax River, MD May 2025 May 2026 2,697 3,221.00 Y Nov 2023 2026 NGDS (16) / ROCKET CENTER, WV SS / FFP NAVAIR, Pax River, MD May 2026 May 2027 5,674 3,275.35 Y Nov 2023 2027 NGDS (16) / ROCKET CENTER, WV SS / FFP NAVAIR, Pax River, MD May 2027 May 2028 6,222 3,442.00 Y Apr 2026 indicates the presence of a P-21 Footnotes: (16) Q2032 FMU-139 Electronic Fuze System: Annual Production Rates are per ordering period, and include USN, USAF, FMS order. LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 9 of 16 P-1 Line #1 Volume 1 - 9 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Fiscal Year 2019 Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 321 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 0 671 671 2 2024 NAVY 4,037 0 4,037 4,037 2 2025 NAVY 2,697 0 2,697 2,697 2 2026 NAVY 5,674 0 5,674 5,674 2 2027 NAVY 6,222 0 6,222 6,222 O C T LI 0145 - General Purpose Bombs Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 10 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 321 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 0 671 2 2024 NAVY 4,037 0 4,037 A - 4,037 2 2025 NAVY 2,697 0 2,697 2,697 2 2026 NAVY 5,674 0 5,674 5,674 2 2027 NAVY 6,222 0 6,222 - - - 671 6,222 O C T LI 0145 - General Purpose Bombs Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 11 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 321 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 0 671 2 2024 NAVY 4,037 0 4,037 - 4,037 2 2025 NAVY 2,697 0 2,697 2,697 2 2026 NAVY 5,674 0 5,674 5,674 2 2027 NAVY 6,222 0 6,222 - - - - - - - - - - - - - - 56 56 56 56 56 56 56 56 223 6,222 O C T LI 0145 - General Purpose Bombs Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 12 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 321 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 448 223 2 2024 NAVY 4,037 0 4,037 2 2025 NAVY 2,697 0 2,697 2 2026 NAVY 5,674 0 5,674 2 2027 NAVY 6,222 0 6,222 56 56 55 0 A - - - - - - - - - - - - 337 3,700 A - - - - - 2,697 5,674 6,222 O C T LI 0145 - General Purpose Bombs Navy 56 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 13 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 A - - - - - - - 321 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 671 0 2 2024 NAVY 4,037 337 3,700 337 337 337 337 336 336 336 336 336 336 336 0 2 2025 NAVY 2,697 0 2,697 - - - - - - - 224 224 224 225 225 225 225 225 225 225 225 225 2 2026 NAVY 5,674 0 5,674 - - - - - - - - - - - 2 2027 NAVY 6,222 0 6,222 A - 0 472 472 A O C T LI 0145 - General Purpose Bombs Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y 473 J U N 473 J U L 473 3,311 - 6,222 A U G S E P Volume 1 - 14 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 2.1.2) Q2210 Laser Capability DSU-39 1 2027 NAVY 321 Item Number / Title [DODIC]: 1 / GP Bomb Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (8) 0 3.1.1) Q2032 FMU-139 Electronic Fuze System 321 - - - - - 26 26 26 27 27 27 27 27 27 27 27 27 0 (11) Prior Years Deliveries: 95138 ✓ 2 2021 NAVY 671 671 0 0 2 2024 NAVY 4,037 4,037 0 0 2 2025 NAVY 2,697 2,697 0 2 2026 NAVY 5,674 2,363 3,311 473 473 473 473 473 473 473 2 2027 NAVY 6,222 0 6,222 - - - - - - - 0 O C T LI 0145 - General Purpose Bombs Navy N O V D E C J A N F E B M A R A P R 0 518 518 518 518 518 518 519 519 519 519 519 519 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R UNCLASSIFIED Page 15 of 16 P-1 Line #1 0 M A Y J U N J U L A U G S E P Volume 1 - 15 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / General Purpose Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / GP Bomb Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 2 NGDS - ROCKET CENTER, WV ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 250 1,200 2,000 0 6 12 18 0 6 12 18 25,000 48,000 60,000 0 12 12 24 0 8 12 20 1 The Boeing Company DSU-39 - St. Charles, MO (16) ALT Prior to Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (16) Q2032 FMU-139 Electronic Fuze System: Annual Production Rates are per ordering period, and include USN, USAF, FMS order. LI 0145 - General Purpose Bombs Navy UNCLASSIFIED Page 16 of 16 P-1 Line #1 Volume 1 - 16 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 Procurement Quantity (Units in Each) 26,010 858 798 1,292 - 1,292 1,768 1,769 1,769 Gross/Weapon System Cost ($ in Millions) 721.222 53.533 59.232 96.935 0.000 96.935 121.732 125.359 127.742 - - - - - 53.533 59.232 96.935 0.000 96.935 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 721.222 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 721.222 - - - - - 53.533 59.232 96.935 0.000 96.935 - - 121.732 125.359 - - 121.732 125.359 127.742 127.742 To FY 2031 Complete 1,769 Continuing 130.245 Continuing 130.245 130.245 Total Continuing Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) Description: The Joint Direct Attack Munition (JDAM) program is a joint Air Force/Navy program with the Air Force as the lead service. Designated ACAT 1C, this program upgrades the existing inventory of general purpose bombs (BLU-111, BLU-117, BLU-110, BLU-109, BLU-126 and BLU-137) by integrating the bombs with a field installed guidance kit using a Global Positioning System-aided Inertial Navigation System (GPS/INS). JDAM provides an accurate, adverse weather capability. JDAM is integrated with the B-52H, B-2A, B-1B, F-16 (all variants), F/A-18A+/C/D/E/F, F-15E, AV-8B, A-10C, F-22A, MQ-9 and F-35 aircraft. JDAM guides the bomb with movable surfaces that steer the bomb to a target based on a Global Positioning Satellite (GPS) coordinate. There is also a family of weapons which combine GPS and laser capabilities to provide a Dual Mode weapon (procured under 0145 General Purpose Bombs): Laser Joint Direct Attack Munition (LJDAM). The component that is added to the 500 lb. and 2,000 lb. JDAM to provide the Laser capability is the DSU-38, DSU-40 and DSU-42 respectively. The DSU-38, DSU-40, and DSU-42 Precision Laser Guidance Set (PLGS) contains a Semi-Active Laser to engage moving and stationary targets and an adjustable proximity sensor to provide an airburst capability. LJDAM is the material solution for the Direct Attack Moving Target Capability (DAMTC). The JDAM Long Range (LR) will be a forward fit ECP to the JDAM baseline program and will leverage the existing JDAM hardware baseline production line and M-Code Technology with modifications for extended range. JDAM LR Non-Recurring engineering involves efforts and activities related to the integration and qualification of JDAM LR, which impacts overall system to include kit configuration. Qualification efforts to include Electromatic Interference (EMI), Electromagnetic Environmental Effects (E3), Insensitive Munitions (IM), Carrier Suitability, production acceptance and test to field the product improvement. Associated systems test and evaluation cost for block software and A/C integration of JDAM Long Range. Pursuant to section 2308 of Title 10, U.S. Code, this program will seek cost efficiencies where available through production lot negotiations. Funding may be used to address production Diminishing Manufacturing Sources Material Shortages (DMSMS) and obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply; and qualification activities to preserve future production capabilities and capacities. Funding may be used to address production improvements to outpace the evolving enemy threats/countermeasures to meet warfighter demand. Funding may be used to increase production capacity in order to meet warfighter demand. The P-5 accurately represents JDAM quantities and unit costs for FY27 vice what is reflected on the P-40 LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 1 of 9 P-1 Line #2 Volume 1 - 17 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / JT Direct Attack Munition (JDAM) Tail Kit P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 26,010 / 721.222 858 / 53.533 798 / 59.232 1,292 / 96.935 - / 0.000 1,292 / 96.935 26,010 / 721.222 858 / 53.533 798 / 59.232 1,292 / 96.935 - / 0.000 1,292 / 96.935 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is required to meet Naval Munitions Requirements Process (NMRP) inventory objectives. FY 2027 baseline funding procures a total of 35 JDAM Long Range (LR) guidance kits and the efforts associated with the qualification. JDAM LR Kit funding is critical to fielding an extended range GPS guided strike capability to meet an urgent fleet need. JDAM LR provides a hardware solution to the existing JDAM configuration which allows employment outside emerging high-threat enemy surface to air capabilities which increases aircraft survivability and mission success. All production buys will be M-Code compliant for improved performance and operational reliability in highly contested GPS-denied environments. FY 2027 baseline funds procurement and integration of Next Generation Naval Mission Planning System (NGNMPS) Weapon Component Migration to JDAM M-Code. Increase in FY2027 aids in establishing the inventory baseline of M-code capable tail kits for improved performance and operational reliability in highly contested GPS-denied environments. JDAM Miscellaneous Support funding is critical to fielding M-Code Weapon capability to meet the North Star 2027 requirement. Weapon component migration provides NGNMPS JDAM capability improvements through multiple United States Navy aircraft platforms planning capabilities focused on emerging, high-threat mission areas (including integrated kinetic/non-kinetic effects) and advanced digital anti-jamming technology for improved performance and operational reliability in highly contested GPS-denied environments (M-Code). Miscellaneous Support also addresses production improvements to outpace the evolving enemy threats/countermeasures to meet warfighter demand. LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 2 of 9 P-1 Line #2 Volume 1 - 18 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) 26,010 858 798 1,292 - 1,292 Gross/Weapon System Cost ($ in Millions) 721.222 53.533 59.232 96.935 0.000 96.935 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 721.222 Plus CY Advance Procurement ($ in Millions) - - - - - 53.533 59.232 96.935 0.000 96.935 - Total Obligation Authority ($ in Millions) 721.222 - - - - - 53.533 59.232 96.935 0.000 96.935 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) - 27,728.64 - 62,392.77 74,225.56 75,027.09 - - 75,027.09 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Qty Total Cost 26,450 692.362 (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) JD500-JDAM Tail Kit 26,176.26 (†) (1) 1.1.2) JD600 JDAM 858 45.050 66,012.86 462 30.498 67,333.12 1,003 67.535 - - - 67,333.12 1,003 67.535 - - - 300,000.00 35 10.500 306,000.00 35 10.710 - - - 306,000.00 35 10.710 - - 45.050 - - 40.998 - - 78.245 - - - - - 78.245 (†) (2) - - Subtotal: Recurring Cost - - - - - - - - - - 9.747 - - 16.156 - - - - - 16.156 - - - - - - - - 9.747 - - 16.156 - - - - - 16.156 - - 692.362 - - 45.050 - - 50.745 - - 94.401 - - - - - 94.401 2.1) JD800-Support Integrated Logistics - - 1.619 - - 0.282 - - 0.287 - - 0.293 - - - - - 0.293 2.2) JD830-Support Production Engineering - - 8.387 - - 1.180 - - 1.198 - - 1.222 - - - - - 1.222 - - 16.371 - - 7.021 - - 7.002 - - 1.019 - - - - - 1.019 2.4) JD870-Support JDAM QS-ER - - 2.483 - - - - - - - - - - - - - - - Subtotal: Support Cost - - 28.860 - - 8.483 - - 8.487 - - 2.534 - - - - - 2.534 LR Kit - 52,505.83 692.362 Non Recurring Cost 1.2.1) JDAM LR NRE (3) Subtotal: Non Recurring Cost Subtotal: Hardware Cost Support Cost 2.3) JD850 Support Miscellaneous Support (4) LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 3 of 9 P-1 Line #2 Volume 1 - 19 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($) 27,728.64 FY 2025 Qty Total Cost 26,010 721.222 (Each) ($ M) Unit Cost ($) 62,392.77 Qty (Each) 858 FY 2026 Total Cost ($ M) 53.533 Unit Cost ($) 74,225.56 Qty (Each) 798 FY 2027 Base Total Cost ($ M) 59.232 Unit Cost ($) 75,027.09 Qty (Each) 1,292 FY 2027 OOC Total Cost ($ M) Unit Cost ($) 96.935 - FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) 75,027.09 Qty (Each) 1,292 Total Cost ($ M) 96.935 indicates the presence of a P-5a Footnotes: (1) Generally, JD500-JDAM Tail Kit Unit prices may vary outside the allowable year to year inflation based on the quantities and combinations of variants being procured each year. There are four tail kit variants that are procured and unit costs are derived from a simple average of the four variants (non-weighted). All production buys will be a SABR-M variant (M-Code). The SABR-M will leverage from SABRY, integrating advanced digital anti-jamming technology for improved performance and operational reliability in highly contested GPS-denied environments. FY 2027 Qtys increase from FY 2026 levels to aid in establishing inventory baseline of M-code capable tail kits for improved performance and operational reliability in highly contested GPS-denied environments. (2) Generally, JD600 - JDAM Long Range (LR) Kit funding is critical to fielding an extended range GPS guided strike capability to meet an urgent fleet need. JDAM LR provides a hardware solution to the existing JDAM configuration which allows employment outside emerging high-threat enemy surface to air capabilities which increases aircraft survivability and mission success. All production buys will be M-Code compliant for improved performance and operational reliability in highly contested GPS-denied environments. (3) Funds activities related to the integration of Long Range JDAM, which impacts overall system to include kit configuration. This cost element includes qualification efforts to include E3, Insensitive Munitions (IM) and carrier suitability (CVS), Packaging, Handling, Shipping and Transportation (PHS&T), Weapons Systems Explosive Safety Review Board (WSESRB), production acceptance and test to field the product improvement. Associated systems test and evaluation cost for block software and A/C integration of Long Range JDAM, and to procure the next generation High Bandwidth Compact Telemetry kits (HCTM). FY26 JDAM LR NRE funds efforts associated with getting Minimum Viable Product (MVP) / Early Operation Capability (EOC) qualified for Fleet use. (Limited E3, IM, CVS, Environmental testing, PHS&T and safety board WSESRB.) FY27 JDAM LR NRE funds expanded envelope for Initial Operation Capability (IOC). (Full E3, IM, CVS, updated WSESRB approval). (4) Funds activities related to the integration of Global Positioning System (GPS) M-Code per DoD mandate, which impacts overall system to include computer processor. This cost element includes parts obsolescence, associated production acceptance and test, ancillary support cost and product improvement. Miscellaneous Support will be used for integration of M-Code. Associated systems test and evaluation cost for block software and M-code integration, and to procure the next generation High Bandwidth Compact Telemetry kits (HCTM). LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 4 of 9 P-1 Line #2 Volume 1 - 20 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 O O C Cost Elements 1.1.1) JD500-JDAM Tail Kit (†) 1.1.1) JD500-JDAM Tail Kit (†) 1.1.1) JD500-JDAM Tail Kit (†) 1.1.1) JD500-JDAM Tail Kit (†) (†) 1.1.2) JD600 JDAM LR Kit (†) 1.1.2) JD600 JDAM LR Kit (†) P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2024 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB May 2024 Jun 2025 1,439 61,525.36 Y May 2023 2025 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB Feb 2025 Mar 2026 858 52,505.83 Y May 2023 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB Mar 2026 Apr 2027 462 66,012.86 Y May 2023 2027 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB Feb 2027 Mar 2028 1,003 67,333.12 Y May 2023 2026 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB Apr 2026 May 2027 35 300,000.00 Y May 2023 2027 The Boeing Company / St. Charles, MO SS / FPIF AFLCMC Hill AFB Feb 2027 Mar 2028 35 306,000.00 Y May 2023 2026 (5) (Each) indicates the presence of a P-21 Footnotes: (5) Contract award delay 1 month due to lapse in funding authorization. LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 5 of 9 P-1 Line #2 Volume 1 - 21 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) JD500-JDAM Tail Kit Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 25011 1 2024 NAVY 1,439 0 1,439 1 2025 NAVY 858 0 858 1 2026 NAVY 462 0 462 462 1 2027 NAVY 1,003 0 1,003 1,003 35 1.1.2) JD600 JDAM LR Kit A - - - - - - - - - - - - - 119 120 120 120 960 A - - - - - - - - 858 (2) 2 2026 NAVY 35 0 35 2 2027 NAVY 35 0 35 35 O C T LI 0148 - JT Direct Attack Munition (JDAM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 22 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) JD500-JDAM Tail Kit Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 25011 1 2024 NAVY 1,439 479 960 120 120 120 120 120 120 120 120 1 2025 NAVY 858 0 858 - - - - - 71 71 71 71 71 71 72 72 72 72 72 72 1 2026 NAVY 462 0 462 - - - - - - - - - - - - 38 38 38 38 38 38 234 1 2027 NAVY 1,003 0 1,003 A - - - - - - - - 1,003 - - - A - - - 1.1.2) JD600 JDAM LR Kit A - 0 0 (2) 2 2026 NAVY 35 0 35 2 2027 NAVY 35 0 35 A O C T LI 0148 - JT Direct Attack Munition (JDAM) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R 2 3 M A Y 3 J U N 3 J U L 3 A U G - 21 35 S E P Volume 1 - 23 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.1) JD500-JDAM Tail Kit Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 25011 1 2024 NAVY 1,439 1,439 0 1 2025 NAVY 858 858 0 1 2026 NAVY 462 228 234 39 39 39 39 39 39 1 2027 NAVY 1,003 0 1,003 - - - - - 83 83 3 3 2 3 1.1.2) JD600 JDAM LR Kit 0 0 0 83 83 83 84 84 84 84 84 84 84 3 3 3 3 3 3 3 3 3 3 0 (2) 2 2026 NAVY 35 14 21 2 2027 NAVY 35 0 35 3 3 O C T LI 0148 - JT Direct Attack Munition (JDAM) Navy 3 N O V 3 D E C 3 J A N F E B M A R A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #2 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 24 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0148 / JT Direct Attack Munition (JDAM) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / JT Direct Attack Munition (JDAM) Tail Kit Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 The Boeing Company - St. Charles, MO 1,500 18,900 25,000 0 5 13 18 0 5 13 18 2 The Boeing Company - St. Charles, MO 35 150 300 0 7 13 20 0 5 13 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0148 - JT Direct Attack Munition (JDAM) Navy UNCLASSIFIED Page 9 of 9 P-1 Line #2 Volume 1 - 25 === page 54 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 26 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Program Elements for Code B Items: N/A Other Related Program Elements: 0204162N, 0206138M Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,760.415 1,760.415 1,760.415 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 57.179 78.884 92.145 0.000 92.145 - - - - - 57.179 78.884 92.145 0.000 92.145 - - - - - 57.179 78.884 92.145 0.000 92.145 102.039 102.039 102.039 153.404 153.404 153.404 186.733 186.733 186.733 To FY 2031 Complete 202.096 Continuing 202.096 202.096 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - 0.00 - 0.00 0.00 0.00 0.00 0.00 - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The 2.75 inch Rocket variant is a versatile system that can be employed across multiple platforms including rotor and fixed wing aircraft, naval vessels, and ground platforms in the Close Air Support (CAS), Military Operations in Urban Terrain (MOUT), counter-Fast Attack Craft/Fast Inshore Attack Craft (counter-FAC/FIAC), and Counter-UAS (C-UAS) mission areas. The 2.75-inch rocket configured with Advanced Precision Kill Weapon System (APKWS) Guidance Sections enable a resilient and precise weapon in support of close combat lethality in complex terrain. Combat and training inventory requirements for rocket and rocket components establish the Total Munitions Requirement (TMR) in accordance with the Naval Munitions Requirements Process (NMRP). Production is for complete units/operationally-configured units to satisfy the requirement of applicable specifications of Airborne Rockets, All types. Airborne Rockets supports both Navy and Marine Corps. APKWS can be outfitted with a variety of fuzes and warheads, such as point detonating and proximity fuzes, the Mk-152 Insensitive Munitions (IM) compliant warhead for shipboard operations with APKWS guidance sections and the M282 Multi-Purpose Penetrator (MPP) warhead among many others, provides fleet users unmatched operational flexibility, improved target-mission matching for specific applications and effects, and permits logistic agility. In testing, inert warheads are used extensively when range restrictions preclude live applications. APKWS is a low-cost Semi-Active Laser (SAL) guidance section to enhance the precision of 2.75-inch unguided rockets. APKWS is a small, lightweight, mid-body guidance section that can be assembled with existing unguided rocket components and can be fired from 2.75-inch rocket launchers. Compared to unguided rockets, APKWS sustains the Joint Force military advantage by offering greater precision, increased stored kills per aircraft sortie, reduces collateral damage, improves effectiveness against soft and lightly armored targets, Counter Unmanned Aerial Systems (C-UAS) targets utilizing a proximity fuze, and enhances close-combat lethality and crew survivability through increased standoff ranges for platforms both air and afloat. Rocket Launchers provide guided and unguided rocket launch capability for 2.75-inch Rockets including the LAU-61 G/A Digital Rocket Launcher (DRL), LAU-61 C/A, and LAU-68 F/A. A variety of containers are required to support shipping, handling, and storage of all-up-round rockets and rocket components. The program re-manufactures existing containers and procures new containers, as needed. The Smokey Sam Simulator System is a pyrotechnic visual cueing device primarily utilized in aircrew training to mimic a Surface-to-Air Missile threat. The system is qualified for use on both land and at sea. Miscellaneous Items provides for procurement of various rocket components not to exceed a total cost of $0.500M per year, per component. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 1 of 13 P-1 Line #3 Volume 1 - 27 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Program Elements for Code B Items: N/A Other Related Program Elements: 0204162N, 0206138M Line Item MDAP/MAIS Code: N/A Product Improvement (PIP) provides for rapid iterative modifications and upgrades to products within Airborne Rockets, All Types. Efforts include configuration changes involving production, engineering, manufacturing, installation, and testing that increases system or combat effectiveness to extend the useful military life of an item, and/or to improve the item within the current performance envelope. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 2 of 13 P-1 Line #3 Volume 1 - 28 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Program Elements for Code B Items: N/A Other Related Program Elements: 0204162N, 0206138M Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Airborne Rockets, All Types P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,760.415 - / 57.179 - / 78.884 - / 92.145 - / 1,760.415 - / 57.179 - / 78.884 - / 92.145 - / - - / 92.145 / 0.000 - / 92.145 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is required to procure 2.75-inch rocket components including rocket motors, fuzes, warheads, APKWS guidance sections, rocket launchers, and containers to support low-cost area suppression and precision engagements across a range of current and future platforms. These capabilities will enable low-collateral-damage Close Air Support and defensive operations from manned and unmanned aircraft, ground-based systems, naval vessels, and other emerging launch platforms. Continued employment will include USMC H-1, AV-8B, and F/A-18 aircraft, as well as US Navy H-60 aircraft, with potential expansion to additional platforms as operational needs evolve. Additionally, FY 2027 Funding is required to address product improvements necessary for obsolete components designed and produced over 40 years ago, as well as the production engineering and integrated logistics support efforts required for all 2.75-inch rocket components. Airborne Rockets product improvement efforts are required to reduce production cost, extend component life, and to improve combat effectiveness on pace with platform combat system improvements. Specific efforts in FY 2027 include, but are not limited to, software changes, fuze enhancements, launcher improvements, APKWS Multi-Mode Seeker midbody design, a longer range motor, Container redesign, refurbishment, and All Up Round container multi-warhead configuration development. FY2027 baseline funding reflects significant increase in demand and use of 2.75-inch rocket weapon systems as its employment now includes the C-UAS mission area. This increased demand resulted in additional FY2027 funding for the procurement of APKWS guidance sections, additional fuzes for inventory wholeness, procurement of proximity fuzes in support of the C-UAS mission, and procurement of the dual safe proximity fuzes required for ship based C-UAS employment Increased procurements are required to maintain inventories above total munitions requirements and support the new C-UAS mission set. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 3 of 13 P-1 Line #3 Volume 1 - 29 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code FY 2025 ($) Qty (Each) Total Cost 851.45 650,611 553.960 Unit Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Airborne Rockets, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) A (1)(†) 1.2) (Q5041) MK 71 ROCKET MOTOR A 1.3) (Q5042) MK 66 ROCKET MOTOR (MOD 6) A 1.4) (Q5200) A SMOKEY SAM (†) 1.5) MK 66 ROCKET MOTOR (MOD 4) GROUND MARINES 2,297.48 13,163 30.242 1,895.62 14,390 27.278 1,696.08 15,095 25.602 - - - 1,696.08 15,095 25.602 - - 56.296 - - - - - - - - - - - - - - - - - 0.585 - - - - - - - - - - - - - - - 336.31 17,805 5.988 340.68 3,100 1.056 347.49 3,200 1.112 354.44 3,200 1.134 - - - 354.44 3,200 1.134 - - - - - - 1,895.62 432 0.819 1,696.08 263 0.446 - - - 1,696.08 263 0.446 - - 616.829 - - 31.298 - - 29.209 - - 27.182 - - - - - 27.182 A (2)(†) Subtotal: 1) Rockets Hardware 2) Rocket Warheads 2.1) (Q5030) WTU1/ B INERT WARHEAD A 2.2) (Q5080) MK 146 HE WARHEAD A 2.3) (Q5090) MK 149 WARHEAD A 2.4) (Q5897) WTU-11/ B WARHEAD A 2.5) (Q5898) M282 MULTI-PURPOSE PENETRATOR (MPP) A 2.6) (Q5899) MK 152 A (3)(†) WARHEAD (4)(†) 2.7) MK 152 WARHEAD - GROUND MARINES 337,002 40.576 160.21 15,086 2.417 225.07 10,122 2.278 226.69 11,505 2.608 - - - 226.69 11,505 2.608 18,431.82 1,100 20.275 - - - - - - - - - - - - - - - 27,902.15 419 11.691 - - - - - - - - - - - - - - - - 1.025 - - - - - - - - - - - - - - - 3,600.63 5,426 19.537 - - - - - - - - - - - - - - - 1,441.80 55,953 80.673 - - - - - - 2,250.00 36 0.081 - - - 2,250.00 36 0.081 - - - - - - 432 1.404 2,250.00 263 0.592 - - - 2,250.00 263 0.592 - - - - - - - - 9,010.64 282 2.541 - - - 9,010.64 282 2.541 - - - - - - 432 2.465 - - - - - - - - - - - - - 2.417 - 6.147 - - 5.822 - - - - - 5.822 - A 3,250.00 (†) 2.8) DUAL-SAFE PROXIMITY FUZE A 2.9) FMU-178B PROXIMITY FUZE - GROUND A (5)(†) MARINES 120.40 - 5,705.79 (†) Subtotal: 2) Rocket Warheads 173.777 - 3) Rocket Launchers LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 4 of 13 P-1 Line #3 Volume 1 - 30 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.1) (Q5895) LAU-68 A F/A (2.75") (6)(†) 3.2) (Q5900) LAU-61 G/A (2.75-Inch) DIGITAL ROCKET LAUNCHER MAIS Code Unit Cost ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Airborne Rockets, All Types FY 2026 Total Cost Unit Cost ($ M) ($) - 75.431 - - - 50,793.38 634 32.203 - - - 29,995.37 216 6.479 - - - - 114.113 - - - 12.200 - 21,854 549.077 21,406.25 Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) 176 3.768 - - - - - - - - - - - - - - 589 14.643 - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - - - - - 50 3.744 - - - - - - - - - 3.768 - - 3.744 - - - - - - - - 30,639.00 484 14.829 31,717.00 1,120 35.523 30,639.00 432 13.236 31,717.00 263 - Total Cost Qty (Each) ($ M) - - 50 3.744 - - - - - - 3.744 - - - - - - - - 31,717.00 1,120 35.523 8.342 - - - 31,717.00 263 8.342 A 74,875.00 74,875.00 (7)(†) 3.3) (QTBD) LAU-61 C/A (2.75-inch) A Subtotal: 3) Rocket Launchers 4) APKWS 4.1) ISRAEL SECURITY SUPPLEMENTAL A 4.2) (Q5896) APKWS A G&C SECTIONS (8)(†) 4.3) APKWS G&C SECTIONS - GROUND MARINES 25,124.78 24,860.78 A - - - - - 561.277 - - 14.643 - - 28.065 - - 43.865 - - - - - 43.865 - - 9.155 - - 0.100 - - 0.100 - - 0.100 - - - - - 0.100 - - 59.525 - - 2.276 - - 2.294 - - 2.352 - - - - - 2.352 - - 68.680 - - 2.376 - - 2.394 - - 2.452 - - - - - 2.452 - - 6.535 - - 0.223 - - 0.225 - - 0.219 - - - - - 0.219 (†) Subtotal: 4) APKWS 5) Other 5.1) (Q5871) MISCELLANEOUS ITEMS A 5.2) (Q5870) CONTAINERS A Subtotal: 5) Other 6) (Q5800) Integrated Logistics Support (ILS) 6.1) ROCKET WARHEADS-ILS A 6.2) ROCKET LAUNCHERS-ILS A - - 1.807 - - 0.133 - - 0.133 - - 0.131 - - - - - 0.131 6.3) APKWS-ILS A - - 1.586 - - 0.067 - - 0.070 - - 0.068 - - - - - 0.068 6.4) OTHER-ILS A - - 0.036 - - - - - - - - - - - - - - - 6.5) GROUND MARINES-ILS A - - - - - - - - 0.433 - - 0.440 - - - - - 0.440 - - 9.964 - - 0.423 - - 0.861 - - 0.858 - - - - - 0.858 - - 2.623 - - 0.072 - - 0.073 - - 0.071 - - - - - 0.071 - - 16.701 - - 0.288 - - 0.294 - - 0.286 - - - - - 0.286 Subtotal: 6) (Q5800) Integrated Logistics Support (ILS) 7) (Q5850) Product Improvement (PIP) 7.1) ROCKET MOTORS-PIP A 7.2) ROCKET WARHEADS-PIP A LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 5 of 13 P-1 Line #3 Volume 1 - 31 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 7.3) ROCKET LAUNCHERS-PIP A 7.4) APKWS-PIP MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Airborne Rockets, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 5.627 - - 0.702 - - 0.718 - - 0.697 - - - - - 0.697 A - - 44.772 - - 2.324 - - 1.922 - - 1.868 - - - - - 1.868 Subtotal: 7) (Q5850) Product Improvement (PIP) - - 69.723 - - 3.386 - - 3.007 - - 2.922 - - - - - 2.922 - - 37.970 - - 0.662 - - 0.672 - - 0.654 - - - - - 0.654 - - 36.142 - - 0.664 - - 0.675 - - 0.655 - - - - - 0.655 - - 25.877 - - 0.239 - - 0.242 - - 0.235 - - - - - 0.235 - - 46.063 - - 1.071 - - 1.076 - - 1.044 - - - - - 1.044 - - - - - - 2.768 - - 2.712 - - - - - 2.712 8) (Q5830) Production Engineering Support (PES) 8.1) ROCKET MOTORS-PES A 8.2) ROCKET WARHEADS-PES A 8.3) ROCKET LAUNCHERS-PES A 8.4) APKWS-PES A 8.5) GROUND MARINES-PES A - - Subtotal: 8) (Q5830) Production Engineering Support (PES) - - 146.052 - - 2.636 - - 5.433 - - 5.300 - - - - - 5.300 Total - - 1,760.415 - - 57.179 - - 78.884 - - 92.145 - - - - - 92.145 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (Q5040) MK 66 ROCKET MOTOR (MOD 4): Pricing is provided by the Army and incorporates other services' buys. Baseline unit cost is dependent on total quantities from the Army. The FY 2027 Mk 66 Unit Cost has experienced a decrease due to updated estimates for component materials. Procurement quantity fluctuations may affect each subsequent Delivery Order unit cost in either direction. The FY 2027 unit cost is comprised of entire Rocket Motor, all elements (Grain and Rocket Motor). (2) MK 66 ROCKET MOTOR (MOD 4) - Ground Marines: Pricing is provided by the Army and incorporates other services' buys. Baseline unit cost is dependent on total quantities from the Army. The FY 2027 Mk 66 Unit Cost has experienced a decrease due to updated estimates for component materials. Procurement quantity fluctuations may affect each subsequent Delivery Order unit cost in either direction. The FY 2027 unit cost is comprised of entire Rocket Motor, all elements (Grain and Rocket Motor). (3) (Q5030) WTU1/B INERT WARHEAD: Pricing provided by the Army and incorporates other services' buys. Baseline unit cost is dependent on total quantities from the Army. Procurement quantity fluctuations may affect each subsequent Delivery Order unit cost up or down. (4) (5) (6) (Q5899) MK 152 WARHEAD: MK 152 FY27 funding purchases warheads that are compatible with proximity fuzes which allows APKWS weapon systems to accomplish their new C-UAS mission set. DUAL-SAFE PROXIMITY FUZE: New cost element added in FY27 to purchase dual-safe proximity fuzes that will be ship compliant and allow the APKWS weapon system to accomplish its new C-UAS mission set. LAU-68 F/A Launcher procurements are required in accordance with inventory levels and failure trends that are monitored on an ongoing basis to keep launcher inventories aligned with rocket motors and warhead inventory requirements. The Navy alternates annual procurements to give economy of scale purchasing power, meet minimum purchasing quantities and provide significant cost savings to the government. (7) (Q5900) LAU-61 G/A (2.75") Digital Rocket Launcher: FY 2027 LAU-61 G/A Launcher procurements are required in accordance with inventory levels and failure trends that are monitored on an ongoing basis to keep launcher inventories aligned with rocket motors and warhead inventory requirements. The Navy alternates annual procurements to give economy of scale purchasing power, meet minimum purchasing quantities and provide significant cost savings to the government. During FY 2026 the Navy had sufficient quantity in inventory to support a Fiscal Year skip in buying Launchers. (8) (Q5896) APKWS G&C SECTIONS: Pricing is provided by the Navy and depends on other customer buys. The unit price fluctuates depending on the total procurement between other services and FMS customers. FY27 increase required in response to the additional demand for the APKWS weapon system employment in support of the C-UAS mission set. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 6 of 13 P-1 Line #3 Volume 1 - 32 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Airborne Rockets, All Types Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1)(†) 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1)(†) 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1)(†) 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1)(†) 1.4) (Q5200) SMOKEY SAM 2024 General Dynamics (9) / Burlington, VT C / FFP Huntsville, AL Jul 2024 Jul 2027 7,771 2,205.58 Y Sep 2018 2025 General Dynamics (9) / Burlington, VT C / FFP Huntsville, AL Jun 2025 Jun 2028 13,163 2,297.48 Y Aug 2024 2026 General Dynamics (9) / Burlington, VT C / FFP Huntsville, AL Jun 2026 Jun 2029 14,390 1,895.62 Y Aug 2024 2027 General Dynamics (9) / Burlington, VT C / FFP Huntsville, AL Jun 2027 Jun 2030 15,095 1,696.08 Y Aug 2024 2025 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Mar 2025 Mar 2026 3,100 340.68 Y 2026 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jun 2026 Jun 2027 3,200 347.49 Y 2027 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jun 2027 Jun 2028 3,200 354.44 Y General Dynamics / Burlington, VT C / FFP Huntsville, AL Jun 2026 Jun 2029 432 1,895.62 Y Aug 2024 2027 General Dynamics / Burlington, VT C / FFP Huntsville, AL Jun 2027 Jun 2030 263 1,696.08 Y Aug 2024 2024 General Dynamics / Burlington, VT C / FFP Huntsville, AL Jul 2024 Jul 2026 21,265 119.51 Y Sep 2018 2025 General Dynamics / Burlington, VT C / FFP Huntsville, AL Jun 2025 Jun 2027 15,086 160.21 Y Aug 2024 2026 General Dynamics / Burlington, VT C / FFP Huntsville, AL Jun 2026 Jun 2028 10,122 225.07 Y Aug 2024 2027 General Dynamics / Burlington, VT C / FFP Huntsville, AL Mar 2027 Mar 2029 11,505 226.69 Y Aug 2024 (4) 2027 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jan 2027 Mar 2028 36 2,250.00 Y 2.7) MK 152 WARHEAD GROUND MARINES 2026 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jun 2026 Aug 2027 432 3,250.00 Y 2.7) MK 152 WARHEAD GROUND MARINES 2027 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jan 2027 Mar 2028 263 2,250.00 Y 2027 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Jan 2027 Mar 2028 282 9,010.64 Y 1.4) (Q5200) SMOKEY SAM 1.4) (Q5200) SMOKEY SAM 1.5) MK 66 ROCKET MOTOR (MOD 4) - GROUND MARINES 1.5) MK 66 ROCKET MOTOR (MOD 4) - GROUND MARINES (2) (2) 2026 (10) 2) Rocket Warheads 2.1) (Q5030) WTU1/B INERT WARHEAD (3) 2.1) (Q5030) WTU1/B INERT WARHEAD (3) 2.1) (Q5030) WTU1/B INERT WARHEAD (3) 2.1) (Q5030) WTU1/B INERT WARHEAD (3) 2.6) (Q5899) MK 152 WARHEAD 2.8) DUAL-SAFE PROXIMITY FUZE (5) LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 7 of 13 P-1 Line #3 Volume 1 - 33 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] 2.9) FMU-178B PROXIMITY FUZE - GROUND MARINES O O C P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Method/Type or Funding Vehicle Aggregated Items: Airborne Rockets, All Types Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2026 NSWC INDIAN HEAD DIV / Indian Head, MD Various NSWC Apr 2026 Apr 2027 432 5,705.79 Y Apr 2025 2026 Arnold Defense / St. Louis, MO SS / FFP NSWC May 2026 May 2027 176 21,406.25 Y Oct 2023 2027 Arnold Defense / St. Louis, MO SS / FFP NSWC Mar 2027 Mar 2028 50 74,875.00 Y Oct 2023 (Each) 3) Rocket Launchers 3.1) (Q5895) LAU-68 F/A (2.75") 3.2) (Q5900) LAU-61 G/A (2.75-Inch) DIGITAL ROCKET LAUNCHER (7) (6) 4) APKWS 4.2) (Q5896) APKWS G&C SECTIONS (8)(†) 4.2) (Q5896) APKWS G&C SECTIONS (8)(†) 4.2) (Q5896) APKWS G&C SECTIONS (8)(†) 4.2) (Q5896) APKWS G&C SECTIONS (8)(†) 4.3) APKWS G&C SECTIONS GROUND MARINES (†) 4.3) APKWS G&C SECTIONS GROUND MARINES (†) (†) 2024 BAE SYSTEMS (11) / NASHUA, NH SS / FFP NAVAIR HQ Dec 2023 Feb 2025 1,218 28,465.48 Y Jul 2018 2025 BAE SYSTEMS (11) / NASHUA, NH SS / FFP NAVAIR HQ May 2025 May 2026 589 24,860.78 Y Sep 2023 2026 BAE SYSTEMS (11) / NASHUA, NH SS / FFP NAVAIR HQ May 2026 May 2027 484 30,639.00 Y Sep 2023 2027 BAE SYSTEMS (11) / NASHUA, NH SS / FFP NAVAIR HQ May 2027 May 2028 1,120 31,717.00 Y Sep 2023 2026 BAE Systems (12) / Nashua, NH SS / FFP NAVAIR HQ May 2026 May 2027 432 30,639.00 Y Sep 2023 2027 BAE Systems (12) / Nashua, NH SS / FFP NAVAIR HQ May 2027 May 2028 263 31,717.00 Y Sep 2023 indicates the presence of a P-21 Footnotes: (9) (Q5040) MK 66 Rockets Motor (MOD 4): Minimum Sustaining Rate is satisfied by multi-service procurements (10) (11) (12) MK 66 ROCKET MOTOR (MOD 4): Pricing is provided by the Army. The unit price includes entire Rocket Motor, all elements (Grain and Rocket Motor). (Q5896) APKWS G&C SECTIONS: Minimum Sustaining Rate is satisfied by multi-service procurements. APKWS G&C SECTIONS - Ground Marines: Minimum Sustaining Rate is satisfied by multi-service procurements. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 8 of 13 P-1 Line #3 Volume 1 - 34 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Airborne Rockets, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1) Prior Years Deliveries: 642840 1 2024 NAVY 7.771 .000 1 2025 NAVY 13.163 .000 13.163 7.771 A - - - - - - - - - - - - - - - 7.771 A - - - - 13.163 1 2026 NAVY 14.390 .000 14.390 14.390 1 2027 NAVY 15.095 .000 15.095 15.095 4) APKWS 4.2) (Q5896) APKWS G&C SECTIONS (8) Prior Years Deliveries: 20636 2 2024 NAVY 1.218 .000 1.218 2 2025 NAVY .589 .000 .589 A - - - - - - - - - - - - - - .054 .054 .054 .054 .054 .054 .054 .055 .785 A - - - - - 2 2026 NAVY .484 .000 .484 .589 .484 2 2027 NAVY 1.120 .000 1.120 1.120 4.3) APKWS G&C SECTIONS - GROUND MARINES 3 2026 NAVY .432 .000 .432 3 2027 NAVY .263 .000 .263 .432 .263 O C T LI 0151 - Airborne Rockets, All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 35 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Airborne Rockets, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1) Prior Years Deliveries: 642840 1 2024 NAVY 7.771 .000 7.771 - - - - - - - - - - - - - - - - - - - - - .647 .647 .647 5.830 1 2025 NAVY 13.163 .000 13.163 - - - - - - - - - - - - - - - - - - - - - - - - 13.163 1 2026 NAVY 14.390 .000 14.390 A - - - - - - - - - - - - - - - - 14.390 1 2027 NAVY 15.095 .000 15.095 A - - - - 15.095 4) APKWS 4.2) (Q5896) APKWS G&C SECTIONS (8) Prior Years Deliveries: 20636 2 2024 NAVY 1.218 .433 .785 .055 .055 .055 .055 - - .056 .056 .056 .056 .056 .057 .057 .057 .057 .057 2 2025 NAVY .589 .000 .589 - - - - - - - .049 .049 .049 .049 .049 .049 .049 .049 .049 .049 .049 .050 .000 2 2026 NAVY .484 .000 .484 A - - - - - - - - - - - - 2 2027 NAVY 1.120 .000 1.120 .000 .040 .040 .040 .040 .040 .284 A - - - - - 1.120 .036 .036 .036 .036 .036 .252 A - - - - - .263 4.3) APKWS G&C SECTIONS - GROUND MARINES 3 2026 NAVY .432 .000 .432 3 2027 NAVY .263 .000 .263 A O C T LI 0151 - Airborne Rockets, All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 36 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Airborne Rockets, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N Calendar Year 2029 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1) Prior Years Deliveries: 642840 1 2024 NAVY 7.771 1.941 .648 .648 .648 .648 .648 .648 .648 .648 .646 1 2025 NAVY 13.163 .000 13.163 5.830 - - - - - - - - 1.096 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 .000 1 2026 NAVY 14.390 .000 14.390 - - - - - - - - - - - - - - - - - - - - 1.199 1.199 1.199 1.199 9.594 1 2027 NAVY 15.095 .000 15.095 - - - - - - - - - - - - - - - - - - - - - - - - 15.095 .000 4) APKWS 4.2) (Q5896) APKWS G&C SECTIONS (8) Prior Years Deliveries: 20636 2 2024 NAVY 1.218 1.218 .000 2 2025 NAVY .589 .589 .000 .000 2 2026 NAVY .484 .200 .284 .040 .040 .040 .041 .041 .041 .041 2 2027 NAVY 1.120 .000 1.120 - - - - - - - .000 .000 .093 .093 .093 .093 .093 .093 .093 .093 .093 .093 .093 .097 .021 .021 .021 .021 .021 .021 .021 .021 .021 .021 .021 .032 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R .000 4.3) APKWS G&C SECTIONS - GROUND MARINES 3 2026 NAVY .432 .180 .252 .036 .036 .036 .036 .036 .036 .036 3 2027 NAVY .263 .000 .263 - - - - - - - O C T LI 0151 - Airborne Rockets, All Types Navy N O V D E C J A N F E B M A R A P R .000 UNCLASSIFIED Page 11 of 13 P-1 Line #3 .000 M A Y J U N J U L A U G S E P Volume 1 - 37 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Airborne Rockets, All Types Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Rockets Hardware 1.1) (Q5040) MK 66 ROCKET MOTOR (MOD 4) (1) Prior Years Deliveries: 642840 1 2024 NAVY 7.771 7.771 .000 1 2025 NAVY 13.163 13.163 .000 1 2026 NAVY 14.390 4.796 9.594 1 2027 NAVY 15.095 .000 15.095 .000 .000 1.199 1.199 1.199 1.199 1.199 1.199 1.199 1.201 - - - - - - - - .000 1.257 1.257 1.257 1.257 1.257 1.257 1.257 1.257 1.257 1.257 1.257 1.268 .000 4) APKWS 4.2) (Q5896) APKWS G&C SECTIONS (8) Prior Years Deliveries: 20636 2 2024 NAVY 1.218 1.218 .000 .000 2 2025 NAVY .589 .589 .000 .000 2 2026 NAVY .484 .484 .000 .000 2 2027 NAVY 1.120 1.120 .000 .000 4.3) APKWS G&C SECTIONS - GROUND MARINES 3 2026 NAVY .432 .432 .000 3 2027 NAVY .263 .263 .000 .000 .000 O C T LI 0151 - Airborne Rockets, All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 38 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0151 / Airborne Rockets, All Types Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Aggregated Items: Airborne Rockets, All Types Production Rates (Each / Year) Procurement Leadtime (Months) Initial MFR Ref # ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 General Dynamics (9) - 50,000 250,000 340,000 0 0 0 0 0 9 18 27 2 BAE SYSTEMS (11) - 1,000 12,000 25,000 0 10 11 21 0 8 11 19 3 BAE Systems (12) - Nashua, 1,000 12,000 25,000 0 0 0 0 0 8 11 19 Burlington, VT NASHUA, NH NH "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (9) (Q5040) MK 66 Rockets Motor (MOD 4): Minimum Sustaining Rate is satisfied by multi-service procurements (11) (12) (Q5896) APKWS G&C SECTIONS: Minimum Sustaining Rate is satisfied by multi-service procurements. APKWS G&C SECTIONS - Ground Marines: Minimum Sustaining Rate is satisfied by multi-service procurements. LI 0151 - Airborne Rockets, All Types Navy UNCLASSIFIED Page 13 of 13 P-1 Line #3 Volume 1 - 39 === page 68 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 40 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 833.217 833.217 833.217 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 11.331 17.101 14.832 0.000 14.832 18.544 19.038 19.382 - - - - - - - - 11.331 17.101 14.832 0.000 14.832 18.544 19.038 19.382 - - - - - - - - 11.331 17.101 14.832 0.000 14.832 18.544 19.038 19.382 To FY 2031 Complete 19.750 Continuing - Continuing - 19.750 Continuing - Total - Continuing - - 19.750 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides procurement of 20MM/25MM ammunition that supports various aircraft gun systems for several Type/Model/Series (T/M/S) aircraft. Funding also includes the integrated logistics support, production engineering support, and product improvement programs in support of all ammunition procurements. The ammunition procurements fall into three categories: Target Practice (TP), High Explosive Incendiary (HEI), and inert. The TP and inert rounds are used for training. The HEI rounds are used for warfighting and training and also include Semi Armor Piercing High Explosive Incendiary (SAPHEI) rounds. Baseline funding procurements are based on the relationship to inventory requirements and expenditure data. All 20MM/25MM ammunition is procured by the Joint Munitions Command, Rock Island, Illinois. 20MM rounds are procured in both linkless and linked configurations. The linkless (or bulk) rounds are used in the M61A1/A2 Gun Systems in the F/A-18 aircraft and the M197 Linkless Feed Gun System on the AH-1Z aircraft. The linked rounds are used in the M197 gun on MH60 aircraft for the Fixed Forward Firing Weapon (FFFW). 25MM rounds are procured in the linkless configuration and are used in the GAU-12 Gun System in the AV-8B aircraft and the GAU-22 Gun System in the F-35B&C. LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 1 of 9 P-1 Line #4 Volume 1 - 41 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Machine Gun Ammunition P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 833.217 - / 11.331 - / 17.101 - / 14.832 - / 0.000 - / 14.832 - / 833.217 - / 11.331 - / 17.101 - / 14.832 - / 0.000 - / 14.832 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is required to procure 20MM Linkless TP, 20MM Linkless, TP-T, and 25MM Linkless, TP and provide associated support costs. The change in 25MM Linkless, TP from FY 2026 to FY 2027 is attributed to the USMC FY 2027 investment in 25MM Training Rounds for Air-To-Ground Weapons. 25MM Linkless, TP training ammunition is established within the Training and Readiness (T&R) flight qualification and provides pre-combat certification prior to F-35 deployment. LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 2 of 9 P-1 Line #4 Volume 1 - 42 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Machine Gun Ammunition MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 11.331 17.101 14.832 0.000 14.832 - Gross/Weapon System Cost ($ in Millions) 833.217 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 833.217 Plus CY Advance Procurement ($ in Millions) - - - - - 11.331 17.101 14.832 0.000 14.832 - Total Obligation Authority ($ in Millions) 833.217 FY 2027 Total - - - - - 11.331 17.101 14.832 0.000 14.832 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Machine Gun Ammunition Cost Recurring Cost 1.1.1) (Q4010) 20MM 15.23 19,195,864 292.354 20.19 6.132 25.47 1.1.2) (Q4050) 20MM LINKLESS, HEI 30.26 5,790,016 175.189 - 1.1.3) (Q4060) 20MM LINKED, TP - - - 27.06 4,304,888 116.491 - - - 1.1.4) (Q4070) 20MM LINKED, HEI 112.39 673,448 75.690 - - 17.30 1,904,967 32.951 37.33 24.52 1,606,376 39.389 52.63 405,570 (†) 25.82 Subtotal: Recurring Cost LINKLESS, TP (†) (1) 1.1.5) (Q4080) 20MM (†) (2) LINKLESS, TP-T 1.1.6) (Q4090) 25MM LINKLESS, TP (†) (3) 1.1.7) (Q4150) 25MM LINKLESS, HEI 1.1.8) (Q4200) INERT ROUND Subtotal: Hardware Machine Gun Ammunition Cost 303,714 380,764 9.698 26.00 - - - - - - - - - 73,130 2.730 - - - - - 36.35 6.286 - - - 26.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 38.82 36,321 1.410 - - - 38.82 36,321 1.410 5.000 37.44 138,889 5.200 - - - 37.44 138,889 5.200 21.346 - - - - - - - - - - - - - - - 49,496 1.278 24.17 4,137 0.100 - - - - - - - - - - - - - - 754.688 - - 8.962 - - 14.698 - - 12.896 - - - - - 12.896 - - 754.688 - - 8.962 - - 14.698 - - 12.896 - - - - - 12.896 - - 16.524 - - 0.572 - - 0.575 - - 0.409 - - - - - 0.409 137,552 241,769 241,769 6.286 Support - Product Improvement Cost 2.1) (Q4850) Machine Gun Ammunition LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 3 of 9 P-1 Line #4 Volume 1 - 43 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Machine Gun Ammunition MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support - Product Improvement Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 16.524 - - 0.572 - - 0.575 - - 0.409 - - - - - 0.409 3.1) (Q4800) Machine Gun Ammunition - - 14.721 - - 0.586 - - 0.592 - - 0.422 - - - - - 0.422 Subtotal: Support Integrated Logistics Cost - - 14.721 - - 0.586 - - 0.592 - - 0.422 - - - - - 0.422 4.1) (Q4830) Machine Gun Ammunition - - 47.284 - - 1.211 - - 1.236 - - 1.105 - - - - - 1.105 Subtotal: Support Production Engineering Cost - - 47.284 - - 1.211 - - 1.236 - - 1.105 - - - - - 1.105 Gross/Weapon System Cost - - 833.217 - - 11.331 - - 17.101 - - 14.832 - - 0.000 - - 14.832 Support - Integrated Logistics Cost Support - Production Engineering Cost (†) indicates the presence of a P-5a Footnotes: (1) (Q4010) 20MM LINKLESS, TP - The reduction in procurement quantities from FY 2026 to FY 2027 is driven by projected inventory levels of 20MM Linkless, TP-T rounds. This adjustment ensures that procurement aligns with current inventory requirements and avoids exceeding necessary stock levels. (2) (3) (Q4080) 20MM LINKLESS, TP-T - The increase from FY 2026 to FY 2027 is required to support training of additional F/A-18 deployments. (Q4090) 25MM LINKLESS, TP - This funding is for continued support of USMC Training and Requirements (T&R) for JSF F-35B/C and is required for increased JSF Fleet deployments. LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 4 of 9 P-1 Line #4 Volume 1 - 44 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements 1.1.1) (Q4010) 20MM LINKLESS, (†) TP 1.1.1) (Q4010) 20MM LINKLESS, (†) TP 1.1.1) (Q4010) 20MM LINKLESS, (†) TP 1.1.5) (Q4080) 20MM LINKLESS, TP-T (†) 1.1.5) (Q4080) 20MM LINKLESS, TP-T (†) 1.1.6) (Q4090) 25MM LINKLESS, (†) TP 1.1.6) (Q4090) 25MM LINKLESS, (†) TP 1.1.6) (Q4090) 25MM LINKLESS, (†) TP 1.1.8) (Q4200) INERT ROUND (†) O O C P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 1 / Machine Gun Ammunition Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 2025 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Jul 2025 Jul 2026 303,714 20.19 Y Feb 2023 2026 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Jul 2026 Jul 2027 380,764 25.47 Y Feb 2023 2027 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / TBD JMC ROCK ISLAND, ILLINOIS Jul 2027 Jul 2028 241,769 26.00 Y Feb 2023 2025 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Jul 2025 Jul 2026 73,130 37.33 Y Feb 2023 2027 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / TBD JMC ROCK ISLAND, ILLINOIS Jul 2027 Jul 2028 36,321 38.82 Y Feb 2023 2024 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Jul 2024 Jul 2025 277,722 34.26 Y Feb 2023 2026 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Jul 2026 Jul 2027 137,552 36.35 Y Feb 2023 2027 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / TBD JMC ROCK ISLAND, ILLINOIS Jul 2027 Jul 2028 138,889 37.44 Y Feb 2023 2025 GENERAL DYNAMICS OTS/ATK / MARION, IL / LAKE CITY, MO C / FFP JMC ROCK ISLAND, ILLINOIS Sep 2025 Sep 2026 4,137 24.17 Y Feb 2023 indicates the presence of a P-21 LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 5 of 9 P-1 Line #4 Volume 1 - 45 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 1.1.1) (Q4010) 20MM LINKLESS, TP Item Number / Title [DODIC]: 1 / Machine Gun Ammunition Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 19195864 1 2025 NAVY 303.714 .000 303.714 1 2026 NAVY 380.764 .000 380.764 380.764 1 2027 NAVY 241.769 .000 241.769 241.769 1.1.5) (Q4080) 20MM LINKLESS, TP-T A - - - 303.714 (2) Prior Years Deliveries: 1904967 2 2025 NAVY 2 2027 NAVY 73.130 (4) .000 73.130 36.321 .000 36.321 1.1.6) (Q4090) 25MM LINKLESS, TP A - - - 73.130 36.321 (3) Prior Years Deliveries: 1328654 3 2024 NAVY 3 2026 NAVY 3 2027 NAVY 277.722 137.552 .000 277.722 (5) .000 137.552 138.889 .000 138.889 A - - - - - - - - - - - 23.144 23.144 23.144 208.290 137.552 138.889 O C T LI 0155 - Machine Gun Ammunition Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 46 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 1.1.1) (Q4010) 20MM LINKLESS, TP Item Number / Title [DODIC]: 1 / Machine Gun Ammunition Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 19195864 1 2025 NAVY 303.714 .000 303.714 1 2026 NAVY 380.764 .000 380.764 1 2027 NAVY 241.769 - - - - - - - - - 25.310 25.310 25.310 25.310 25.310 25.310 25.309 25.309 25.309 25.309 25.309 25.309 A - - - - - - - - - - - - .000 241.769 1.1.5) (Q4080) 20MM LINKLESS, TP-T .000 31.731 31.731 31.731 285.571 A - - - 241.769 A - - - 36.321 (2) Prior Years Deliveries: 1904967 2 2025 NAVY 2 2027 NAVY 73.130 (4) .000 73.130 36.321 .000 36.321 1.1.6) (Q4090) 25MM LINKLESS, TP - - - - - - - - - 6.095 6.095 6.094 6.094 6.094 6.094 6.094 6.094 6.094 6.094 6.094 6.094 .000 (3) Prior Years Deliveries: 1328654 3 2024 NAVY 3 2026 NAVY 3 2027 NAVY 277.722 137.552 69.432 208.290 23.144 23.144 23.144 23.143 23.143 23.143 23.143 23.143 23.143 (5) .000 137.552 138.889 .000 138.889 A - - - - - - - - - - - - 11.463 11.463 11.463 103.163 A - O C T LI 0155 - Machine Gun Ammunition Navy .000 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G - 138.889 S E P Volume 1 - 47 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 1.1.1) (Q4010) 20MM LINKLESS, TP Item Number / Title [DODIC]: 1 / Machine Gun Ammunition Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 19195864 1 2025 NAVY 303.714 303.714 1 2026 NAVY 380.764 95.193 285.571 31.731 31.730 31.730 31.730 31.730 31.730 31.730 31.730 31.730 .000 .000 1 2027 NAVY 241.769 .000 241.769 1.1.5) (Q4080) 20MM LINKLESS, TP-T .000 - - - - - - - - - 20.148 20.148 20.148 20.148 20.148 20.147 20.147 20.147 20.147 20.147 20.147 20.147 - - - - - - - - - 3.027 .000 (2) Prior Years Deliveries: 1904967 2 2025 NAVY 2 2027 NAVY 73.130 73.130 (4) 36.321 1.1.6) (Q4090) 25MM LINKLESS, TP .000 .000 .000 36.321 3.027 3.027 3.027 3.027 3.027 3.027 3.027 3.027 3.026 3.026 3.026 .000 (3) Prior Years Deliveries: 1328654 3 2024 NAVY 3 2026 NAVY 3 2027 NAVY 277.722 137.552 (5) 138.889 277.722 .000 .000 34.389 103.163 11.463 11.463 11.463 11.463 11.463 11.462 11.462 11.462 11.462 .000 138.889 O C T LI 0155 - Machine Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N .000 11.574 11.574 11.574 11.574 11.574 11.574 11.574 11.574 11.574 11.574 11.574 11.575 J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N .000 J U L A U G S E P Volume 1 - 48 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0155 / Machine Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Machine Gun Ammunition Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS OTS/ ATK - MARION, IL / LAKE CITY, MO 300,000 2,350,000 4,000,000 0 0 0 0 0 10 12 22 2 GENERAL DYNAMICS OTS/ ATK - MARION, IL / LAKE CITY, MO 50,000 300,000 500,000 0 0 0 0 0 10 12 22 3 GENERAL DYNAMICS OTS/ ATK - MARION, IL / LAKE CITY, MO 250,000 1,632,000 3,264,000 0 0 0 0 0 10 12 22 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (4) (5) Production gaps are filled by other services and FMS Procurements Minimum sustaining quantities and production gaps are filled by other services and FMS procurements. LI 0155 - Machine Gun Ammunition Navy UNCLASSIFIED Page 9 of 9 P-1 Line #4 Volume 1 - 49 === page 78 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 50 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0160 / Practice Bombs Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,269.079 1,269.079 1,269.079 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 33.964 43.659 46.782 0.000 46.782 46.957 51.958 54.465 - - - - - - - - 33.964 43.659 46.782 0.000 46.782 46.957 51.958 54.465 - - - - - - - - 33.964 43.659 46.782 0.000 46.782 46.957 51.958 54.465 To FY 2031 Complete 55.546 Continuing - Continuing - 55.546 Continuing - Total - Continuing - - 55.546 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The purpose of the Practice Bombs budget is to procure a variety of low cost alternative practice bombs to be employed by Navy and Marine Corps Aircraft. Using practice bombs in place of High Explosive (HE) live rounds is a cost effective and practical way to train aircrew, maintenance personnel, and ground attack controllers. Practice bombs also provide increased training opportunity on ranges where HE ordnance is not permitted. The munitions procured through this PE/BLI are procured by the Joint Munitions Command, the Single Manager for Conventional Ammunition, with the exception of the Laser Guided Training Round, which is procured by NAVAIR. Specific Products are, but not limited to the MK-76 and BDU-33 small practice bombs which are low cost 25lb tear dropped shaped practice bombs that simulate a MK-82 low drag configuration used by the Navy and Marine Corps. The CXU-3A/B signal cartridge (daytime operations) spotting charge is used for visual indication of bomb impact. The MK-82 is a 500lb unguided, low-drag practice bomb. Other full-scale inert Practice Bomb variations are the MK-83 1,000lb, MK-84 2,000lb, and BLU-109 2,000lb penetrator. The BLU-137 Inert is a full-scale 2,000lb inert penetrator designed by the USAF to improve survivability of the BLU-109 and may be used as a suitable substitute. Inert General Purpose Bomb cases are filled with an inert material and have the same weight, size, center of gravity and ballistics of the live bomb configurations. The Laser Guided Training Round (LGTR) simulates Laser Guided Weapons and provides a low cost alternative to the use of full scale munitions. The LGTR is capable of replicating the Paveway II laser Guided Bomb and is suitable for deployment from select Navy and Marine Corps aircraft. The round allows the aviator to exercise the coordination between the aircrew and the laser designator and to emulate delivery options and multi-aircraft tactics. The development and retention of this skill set is extensive and the LGTR provides the capability to exercise the system in a cost effective manner. The Practice Bombs budget also funds miscellaneous items including but not limited to low cost items such as M70 series cables, MK-89 adapters, lanyards, lugs, nose plugs, inert fill material, control surfaces, bands, strakes, aero panels, dunnage, packaging and containers required for assembly and shipment of an inert practice bombs. The Product Improvement Program funds efforts to investigate and incorporate design changes to address manufacturing, production and technology insertions that improve practice stores platform integration, system reliability, obsolescence, and producibility. Funding may be used to address Production Improvements to outpace the evolving enemy threats/countermeasures to meet warfighter demand. The demand for practice bombs correlates to the Training & Readiness (T&R) requirements for both aviation and ground communities. Each T&R syllabus prescribes a minimum number of "live drops" which can be satisfied with practice ordnance. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness, and combat effectiveness for aircrew and ground controllers alike. LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 1 of 12 P-1 Line #5 Volume 1 - 51 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0160 / Practice Bombs Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Practice Bombs P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,269.079 - / 33.964 - / 43.659 - / 46.782 - / 0.000 - / 46.782 - / 1,269.079 - / 33.964 - / 43.659 - / 46.782 - / 0.000 - / 46.782 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is provided for training munitions requirements that are based on the needs of the Fleet Aviation Training and Tactical Squadrons and are updated with actual expenditures on an annual basis. The munitions are essential in training and retaining weapons delivery proficiency. This budget supports critical Navy Title 10 war reserve/operational, training, and test requirements as identified within the DoD Instruction 3000.04 (Munitions Requirements Process) and OPNAV INST 8011.9 (Navy Munitions Requirements Process). Practice Bomb procurements provide the Fleet subscale and/or inert stores in lieu of significantly more expensive full scale and/or high explosive stores procured with General Purpose Bombs funding; thereby reducing the overall cost in achieving fleet training readiness levels. The annual disbursement of training munitions is done via a Non-Combat Expenditure Allocation (NCEA) and provides the individual units with an allocation under which they plan their annual training syllabuses. Additionally, training/inert munitions support the development, fielding, safety, and quality assurance of Navy munitions and equipment throughout their life cycle. These munitions support the individual and collective training of Active and Reserve Component forces. The annual expenditures of practice stores prepares Naval Aviation units for deployment and is the largest driver of current and future munitions procurement. Procurements are primarily designed to replenish the practice bombs weapons used each year to achieve required readiness levels. Unlike procurement of capital assets, a large percentage of weapons are consumed in annual fleet training expenditures; thereby reducing the ability to simply slide procurements a year in response to budget reductions. Barring a reduction in fleet training expenditures and the correlating readiness degradation, any reductions in practice bomb procurements in a given year will be addressed through increased procurements in the out years to restore inventory to a level adequate to support NCEA and fleet readiness. LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 2 of 12 P-1 Line #5 Volume 1 - 52 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Practice Bombs MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 33.964 43.659 46.782 0.000 46.782 - Gross/Weapon System Cost ($ in Millions) 1,269.079 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,269.079 Plus CY Advance Procurement ($ in Millions) - - - - - 33.964 43.659 46.782 0.000 46.782 - Total Obligation Authority ($ in Millions) 1,269.079 FY 2027 Total - - - - - 33.964 43.659 46.782 0.000 46.782 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Practice Bombs Cost Recurring Cost (†) 1.1.1) Q1010 MK-76 (1) 1.1.2) Q1020 BDU-33 (†) (2) 1.1.3) Q1040 MK-82 (†) (3) INERT 1.1.4) Q1050 BLU-109 (†) (4) INERT 1.1.5) Q1100 CXU-3 (†) (5) A/B Subtotal: Recurring Cost Subtotal: Hardware Practice Bombs Cost 77.45 767,474 59.440 88.23 40,088 3.537 89.99 47,427 4.268 91.79 45,512 4.178 - - - 91.79 45,512 4.178 89.42 5,010 0.448 92.64 1,100 0.102 94.49 1,100 0.104 96.38 1,137 0.110 - - - 96.38 1,137 0.110 2,614.41 38,287 100.098 3,152.22 1,119 3.527 3,215.26 2,733 8.787 3,279.57 2,707 8.878 - - - 3,279.57 2,707 8.878 23,500.53 943 22.161 32,177.63 152 4.891 32,775.03 50 1.639 33,430.58 50 1.672 - - - 33,430.58 50 1.672 54.05 3,330 0.180 55.15 4,587 0.253 56.25 11,806 0.664 57.38 3,325 0.191 - - - 57.38 3,325 0.191 - - 182.327 - - 12.310 - - 15.462 - - 15.029 - - - - - 15.029 - - 182.327 - - 12.310 - - 15.462 - - 15.029 - - - - - 15.029 2,258 14.725 4,002 21.311 4,760 24.732 - - - 4,760 24.732 Hardware - Precision Guided Practice Bombs Cost Recurring Cost 2.1.1) Q1300 LGTR (†) (6) Subtotal: Recurring Cost Subtotal: Hardware Precision Guided Practice Bombs Cost 3,491.17 103,288 360.596 6,521.22 5,325.02 5,195.76 5,195.76 - - 360.596 - - 14.725 - - 21.311 - - 24.732 - - - - - 24.732 - - 360.596 - - 14.725 - - 21.311 - - 24.732 - - - - - 24.732 LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 3 of 12 P-1 Line #5 Volume 1 - 53 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Practice Bombs MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Miscellaneous Cost Recurring Cost 3.1.1) Q1062 Miscellaneous Items - - 18.854 - - 0.751 - - 0.766 - - 0.782 - - - - - 0.782 Subtotal: Recurring Cost - - 18.854 - - 0.751 - - 0.766 - - 0.782 - - - - - 0.782 - - 18.854 - - 0.751 - - 0.766 - - 0.782 - - - - - 0.782 (7) Subtotal: Hardware Miscellaneous Cost Hardware - Prior Years Cost Non Recurring Cost 4.1.1) Prior Years - - 635.595 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 635.595 - - - - - - - - - - - - - - - Subtotal: Hardware - Prior Years Cost - - 635.595 - - - - - - - - - - - - - - - 5.1) Q1800 Practice Bombs ILS - - 2.362 - - 0.377 - - 0.384 - - 0.392 - - - - - 0.392 5.2) Q1800 Precision Guided Practice Bombs ILS - - 2.493 - - 0.192 - - 0.196 - - 0.200 - - - - - 0.200 - - 4.855 - - 0.569 - - 0.580 - - 0.592 - - - - - 0.592 6.1) Q1830 Practice Bombs PES - - 14.831 - - 1.146 - - 1.169 - - 1.193 - - - - - 1.193 6.2) Q1830 Precision Guided Practice Bombs PES - - 20.641 - - 1.090 - - 1.112 - - 1.135 - - - - - 1.135 Subtotal: Support Production Engineering Cost - - 35.472 - - 2.236 - - 2.281 - - 2.328 - - - - - 2.328 - - 28.341 - - 3.207 - - 3.090 - - 3.147 - - - - - 3.147 Support - Integrated Logistics Cost Subtotal: Support Integrated Logistics Cost Support - Production Engineering Cost Support - Miscellaneous Support Cost 7.1) Q1850 Product Improvement Program (PIP) (8) (9) - - 3.039 - - 0.166 - - 0.169 - - 0.172 - - - - - 0.172 Subtotal: Support Miscellaneous Support Cost - - 31.380 - - 3.373 - - 3.259 - - 3.319 - - - - - 3.319 Gross/Weapon System Cost - - 1,269.079 - - 33.964 - - 43.659 - - 46.782 - - 0.000 - - 46.782 7.2) Q1894 Gauging LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 4 of 12 P-1 Line #5 Volume 1 - 54 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0160 / Practice Bombs ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 1 / Practice Bombs MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (1) Q1010 MK-76: The demand for Practice Bombs correlates to the Training and Readiness requirements for both aviation and ground communities. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness and combat effectiveness. Adjustments to the Non Combat Expenditure Allowance (NCEA) fluctuate annually due to emerging fleet readiness exercises and training augmentations. (2) Q1020 BDU-33: The demand for Practice Bombs correlates to the Training and Readiness requirements for both aviation and ground communities. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness and combat effectiveness. Adjustments to the NCEA fluctuate annually due to emerging fleet readiness exercises and training augmentations. (3) Q1040 MK-82 Inert: The demand for Practice Bombs correlates to the Training and Readiness requirements for both aviation and ground communities. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness and combat effectiveness. Adjustments to the NCEA fluctuate annually due to emerging fleet readiness exercises and training augmentations. (4) Q1050 BLU-109 Inert: The demand for Practice Bombs correlates to the Training and Readiness requirements for both aviation and ground communities. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness and combat effectiveness. Adjustments to the NCEA fluctuate annually due to emerging fleet readiness exercises and training augmentations. (5) (6) Q1100 CXU-3A/B: is a smoke signal cartridge used in the nose of the inert weapons to identify impact. FY 2027 quantities decrease due to projected usage rates and current inventory levels. Q1300 LGTR: The demand for Practice Bombs correlates to the Training and Readiness requirements for both aviation and ground communities. The release of practice ordnance as part of realistic and tactical training scenarios provides increased safety, readiness and combat effectiveness. Adjustments to the Non Combat Expenditure Allowance (NCEA) fluctuate annually due to emerging fleet readiness exercises and training augmentations. (7) Q1062 Miscellaneous Items: Misc. Items includes various bomb subcomponents such as lugs, inert fill material, steel pipe, control surfaces, band, strakes, aero panels, dunnage, packaging and containers required for assembly and shipment of an inert practice item. (8) Q1850 Product Improvement Program (PIP): Includes improvements to products and processes related to the production of practice rounds and kits. Additionally, this cost element funds parts obsolescence, associated production acceptance test and ancillary support cost. (9) Q1894 Gauging: is required for materials and labor for calibration and recertification of gauges necessary to support Practice hardware production. LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 5 of 12 P-1 Line #5 Volume 1 - 55 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 O O C P-1 Line Item Number / Title: 0160 / Practice Bombs Item Number / Title [DODIC]: 1 / Practice Bombs FY Contractor and Location Method/Type or Funding Vehicle 1.1.1) Q1010 MK-76 2024 Delfasco, LLC / Afton,TN C / FFP JMC, Rock Island, IL Jun 2024 Jun 2026 55,560 86.50 Y Nov 2019 1.1.1) Q1010 MK-76 2025 Delfasco, LLC / Afton,TN C / FFP JMC, Rock Island, IL Jun 2025 Jun 2027 40,088 88.23 Y Nov 2019 1.1.1) Q1010 MK-76 2026 Delfasco, LLC / Afton,TN C / FFP JMC, Rock Island, IL Jun 2026 Jun 2028 47,427 89.99 Y Nov 2019 1.1.1) Q1010 MK-76 2027 Delfasco, LLC / Afton,TN C / FFP JMC, Rock Island, IL Jun 2027 Jun 2029 45,512 91.79 Y Oct 2025 Cost Elements Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1.1.2) Q1020 BDU-33 2024 Delfasco, LLC (10) / Afton,TN C / FFP JMC, Rock Island, IL Jun 2024 Jun 2026 1,010 90.82 Y Nov 2019 1.1.2) Q1020 BDU-33 2025 Delfasco, LLC (10) / Afton,TN C / FFP JMC, Rock Island, IL Mar 2025 Mar 2027 1,100 92.64 Y Nov 2019 1.1.2) Q1020 BDU-33 2026 Delfasco, LLC (10) / Afton,TN C / FFP JMC, Rock Island, IL Mar 2026 Mar 2028 1,100 94.49 Y Nov 2019 Delfasco, LLC (10) / Afton,TN 1.1.2) Q1020 BDU-33 1.1.3) Q1040 MK-82 INERT (†) 1.1.3) Q1040 MK-82 INERT (†) 1.1.3) Q1040 MK-82 INERT (†) 1.1.3) Q1040 MK-82 INERT (†) 1.1.3) Q1040 MK-82 INERT 1.1.4) Q1050 BLU-109 INERT 1.1.4) Q1050 BLU-109 INERT 1.1.4) Q1050 BLU-109 INERT 1.1.5) Q1100 CXU-3 A/B 1.1.5) Q1100 CXU-3 A/B 1.1.5) Q1100 CXU-3 A/B 1.1.5) Q1100 CXU-3 A/B 2.1.1) Q1300 LGTR (†) 2.1.1) Q1300 LGTR (†) C / FFP JMC, Rock Island, IL Mar 2027 Mar 2029 1,137 96.38 Y Oct 2025 2023 General Dynamics / Garland, TX / MCAAP C / FP JMC, Rock Island, IL Apr 2024 Dec 2026 1,331 3,029.81 Y Jan 2023 2024 General Dynamics / Garland, TX / MCAAP C / FP JMC, Rock Island, IL Sep 2024 May 2027 1,591 3,090.41 Y Jan 2023 2025 General Dynamics / Garland, TX / MCAAP C / FP JMC, Rock Island, IL Apr 2025 Dec 2027 1,119 3,152.22 Y Jan 2023 2026 General Dynamics / Garland, TX / MCAAP C / FP JMC, Rock Island, IL Apr 2026 Dec 2028 2,733 3,215.26 Y Jan 2023 2027 General Dynamics / Garland, TX / MCAAP C / FP JMC, Rock Island, IL Apr 2027 Dec 2029 2,707 3,279.57 Y Jan 2023 2025 EllWood National Forge / Irvine, PA/MCAAP C / FFP JMC, Rock Island, IL Jul 2025 Jul 2028 152 32,177.63 Y Nov 2022 2026 EllWood National Forge / Irvine, PA/MCAAP C / FFP JMC, Rock Island, IL Jul 2026 Jul 2029 50 32,775.03 Y Nov 2022 2027 EllWood National Forge / Irvine, PA/MCAAP C / FFP JMC, Rock Island, IL Jul 2027 Jul 2030 50 33,430.58 Y Nov 2022 2024 SPECTRA TECHNOLOGIES / CAMDEN, AR C / FFP JMC, Rock Island, IL Jun 2024 Dec 2025 3,330 54.04 Y Sep 2021 2025 SPECTRA TECHNOLOGIES / CAMDEN, AR C / FFP JMC, Rock Island, IL Apr 2025 Oct 2026 4,587 55.15 Y Sep 2021 2026 SPECTRA TECHNOLOGIES / CAMDEN, AR C / FFP JMC, Rock Island, IL Apr 2026 Oct 2027 11,806 56.25 Y Sep 2021 2027 SPECTRA TECHNOLOGIES / CAMDEN, AR C / FFP JMC, Rock Island, IL Apr 2027 Oct 2028 3,325 57.38 Y Sep 2021 2024 Lockheed Martin Corporation LGTR / Archbald, PA SS / IDIQ NAVAIR, Pax River, MD Dec 2023 Aug 2025 6,096 4,517.07 Y Mar 2023 2025 Lockheed Martin Corporation LGTR / Archbald, PA SS / IDIQ NAVAIR, Pax River, MD Apr 2025 Dec 2026 2,258 6,521.22 Y Apr 2024 2027 (†) LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 6 of 12 P-1 Line #5 Volume 1 - 56 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (†) 2.1.1) Q1300 LGTR (†) 2.1.1) Q1300 LGTR (†) O O C P-1 Line Item Number / Title: 0160 / Practice Bombs Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Practice Bombs Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 2026 Lockheed Martin Corporation LGTR / Archbald, PA SS / IDIQ NAVAIR, Pax River, MD Dec 2025 Aug 2027 4,002 5,325.02 Y Dec 2024 2027 Lockheed Martin Corporation LGTR / Archbald, PA SS / IDIQ NAVAIR, Pax River, MD Mar 2027 Nov 2028 4,760 5,195.76 Y Mar 2026 (Each) indicates the presence of a P-21 Footnotes: (10) MSR is reached though USN and USAF procurments. LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 7 of 12 P-1 Line #5 Volume 1 - 57 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.3) Q1040 MK-82 INERT Item Number / Title [DODIC]: 1 / Practice Bombs Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (3) Prior Years Deliveries: 35365 1 2023 NAVY 1,331 0 1,331 1 2024 NAVY 1,591 0 1,591 1 2025 NAVY 1,119 0 1,119 1 2026 NAVY 2,733 0 2,733 2,733 1 2027 NAVY 2,707 0 2,707 2,707 2.1.1) Q1300 LGTR A - - - - - - - - - - - - - - - - - - 1,331 A - - - - - - - - - - - - - 1,591 A - - - - - - 1,119 (6) Prior Years Deliveries: 97192 2 2024 NAVY 6,096 0 6,096 2 2025 NAVY 2,258 0 2,258 2 2026 NAVY 4,002 0 4,002 2 2027 NAVY 4,760 0 4,760 A - - - - - - - - - - - - - - - - - - - 508 508 5,080 A - - - - - - 2,258 4,002 4,760 O C T LI 0160 - Practice Bombs Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 58 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.3) Q1040 MK-82 INERT Item Number / Title [DODIC]: 1 / Practice Bombs Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 222 Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R (3) Prior Years Deliveries: 35365 1 2023 NAVY 1,331 0 1,331 - - - - - - - - - - - - - - 110 111 111 111 111 111 111 111 111 111 1 2024 NAVY 1,591 0 1,591 - - - - - - - - - - - - - - - - - - - 132 132 132 132 132 931 1 2025 NAVY 1,119 0 1,119 - - - - - - - - - - - - - - - - - - - - - - - - 1,119 1 2026 NAVY 2,733 0 2,733 A - - - - - - - - - - - - - - - - - - 2,733 1 2027 NAVY 2,707 0 2,707 A - - - - - - 2,707 2.1.1) Q1300 LGTR (6) Prior Years Deliveries: 97192 2 2024 NAVY 6,096 1,016 5,080 508 508 508 508 508 508 508 508 508 508 2 2025 NAVY 2,258 0 2,258 - - - - - - - - - - - - - - 189 189 188 2 2026 NAVY 4,002 0 4,002 A - - - - - - - - - - - - - - - 2 2027 NAVY 4,760 0 4,760 O C T LI 0160 - Practice Bombs Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 188 188 188 188 188 188 188 376 - - - - - 333 333 3,336 A - - - - - - - 4,760 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 59 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.3) Q1040 MK-82 INERT Item Number / Title [DODIC]: 1 / Practice Bombs Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (3) Prior Years Deliveries: 35365 1 2023 NAVY 1,331 1,109 222 111 111 1 2024 NAVY 1,591 660 931 133 133 133 133 133 133 133 1 2025 NAVY 1,119 0 1,119 - - 93 93 93 93 93 93 93 93 93 94 94 94 1 2026 NAVY 2,733 0 2,733 - - - - - - - - - - - - - - 227 227 227 228 228 228 228 228 228 228 456 1 2027 NAVY 2,707 0 2,707 - - - - - - - - - - - - - - - - - - - - - - - - 2,707 2.1.1) Q1300 LGTR 0 0 0 (6) Prior Years Deliveries: 97192 2 2024 NAVY 6,096 6,096 0 2 2025 NAVY 2,258 1,882 376 188 188 0 2 2026 NAVY 4,002 666 3,336 333 333 333 333 334 334 334 334 334 334 2 2027 NAVY 4,760 0 4,760 - - - - - - - - - - O C T LI 0160 - Practice Bombs Navy N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 10 of 12 S E P O C T 396 396 396 396 397 397 397 397 397 397 397 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P P-1 Line #5 397 Volume 1 - 60 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY PROC QTY SERVICE 1.1.3) Q1040 MK-82 INERT Item Number / Title [DODIC]: 1 / Practice Bombs Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (3) Prior Years Deliveries: 35365 1 2023 NAVY 1,331 1,331 0 0 1 2024 NAVY 1,591 1,591 0 0 1 2025 NAVY 1,119 1,119 0 1 2026 NAVY 2,733 2,277 456 228 228 1 2027 NAVY 2,707 0 2,707 - - 2.1.1) Q1300 LGTR 0 0 225 225 225 225 225 226 226 226 226 226 226 226 0 (6) Prior Years Deliveries: 97192 2 2024 NAVY 6,096 6,096 0 0 2 2025 NAVY 2,258 2,258 0 0 2 2026 NAVY 4,002 4,002 0 2 2027 NAVY 4,760 4,363 397 0 397 O C T LI 0160 - Practice Bombs Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 61 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0160 / Practice Bombs Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Practice Bombs Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 General Dynamics - Garland, TX / MCAAP 7,200 10,800 45,600 0 7 32 39 0 7 32 39 2 Lockheed Martin Corporation LGTR - Archbald, PA 4,000 8,400 22,000 0 6 20 26 0 6 20 26 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0160 - Practice Bombs Navy UNCLASSIFIED Page 12 of 12 P-1 Line #5 Volume 1 - 62 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 73.782 77.079 63.064 0.000 63.064 91.734 88.754 81.187 1,267.358 1,267.358 - - - - - - - - 73.782 77.079 63.064 0.000 63.064 91.734 88.754 81.187 1,267.358 - - - - - - - - 73.782 77.079 63.064 0.000 63.064 91.734 88.754 81.187 To FY 2031 Complete 82.809 Continuing - Continuing - 82.809 Continuing - Total - Continuing - - 82.809 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Cartridge Actuated Devices/Propellant Actuated Devices (CAD/PAD) program's mission is to procure over 700 distinct service life-limited explosive/energetic devices. These devices perform critical safety functions in support of flight operations. Specifically, these devices are in US Navy's Naval Aircrew Common Ejection Seats (NACES), Aircraft safety of flight components, aircrew survival equipment and weapon systems release systems. The CAD/PAD yearly requirement is modeled on the total reported active aircraft as per the Office of the Naval Operations (OPNAV). The quantity for these unique requirements vary due to the distinct energetics of each CAD/PAD service life. Extending service life of CAD/PAD components beyond recommended use due to unavailability can pose a significant safety risk to aircrew. These explosives/energetics have finite service lives and are replaced during scheduled maintenance. Aircraft readiness may be impacted if any one of these items does not meet service life recommendations and cannot be extended. The new layout is listed below, by aircraft and description. T-6: Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Ejection seat catapult cartridges and rocket motors including Under Seat Rocket Motors, Impulse Cartridges, Digital Inline Timers, and Small-Column Insulated Delay initiators. Other aircraft cartridge actuated devices include Internal Canopy Mechanical Actuated Initiators, Seat Movement Mechanical Actuated Initiators, External Canopy Mechanical Actuated Initiators, Donor Assemblies, Manifolds, and ballistic transfer and canopy fracturing lines, T-38/F-5: Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Ejection seat catapult cartridges and rocket motors including Under Seat Rocket Motors, Impulse Cartridges, Digital Inline Timers, and Small-Column Insulated Delay initiators. Other aircraft cartridge actuated devices include Canopy removers and thrusters, and Donor Assemblies, V-22: Funding supports procurement of cartridge actuated devices. Examples of items used on this aircraft include: Internal Canopy Mechanical Actuated Initiators, External Canopy Mechanical Actuated Initiators, Gas Generators, Canopy and Hatch Shape Charge Assemblies, Thin Linear Explosive Ballistic Transfer Lines, Fire Extinguisher Cartridges, and Impulse Cartridges. F/A-18 & EA-18: Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Ejection seat cartridges and rocket motors including Parachute Deployment Rocket Motors, sequencer thermal batteries, Under Seat Rocket Motors, Impulse Cartridges, and seat catapult primary initiators, Digital Inline Timers, and Small-Column Insulated Delay initiators. Other aircraft devices include Fire Suppression Gas Generators, Fire Extinguisher Cartridges, ballistic transfer lines, canopy jettison rocket motors, DFIRS explosive doors, and DFIRS initiation components. LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 1 of 6 P-1 Line #6 Volume 1 - 63 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A T-45: Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Ejection seat cartridges and rocket motors including Parachute Deployment Rocket Motors, sequencer thermal batteries, Under Seat Rocket Motors, Impulse Cartridges, and seat catapult primary initiators, Digital Inline Timers, and Small-Column Insulated Delay initiators. Other aircraft devices include ballistic transfer lines and canopy fracturing mild detonating cords. All Other Platforms: CAD/PAD devices typically procured yearly under this budget line, but not limited to, include explosive separators, aircrew and deck crew inflators, safety and arming devices, sequence controls, shielded mild detonating cords, initiators, thrusters, fire extinguisher cartridges, and other devices used in aircraft emergency escape and safety systems. These devices number in the hundreds of unique components where the unit cost varies based on Economic Order Quantities varying from budget to budget for planned procurements. LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 2 of 6 P-1 Line #6 Volume 1 - 64 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Cartridge Actuated Devices/Propellant Act Devices - / 1,267.358 - / 73.782 - / 77.079 - / 63.064 P-40 Total Gross/Weapon System Cost - / 1,267.358 - / 73.782 - / 77.079 - / 63.064 - / - - / 63.064 / 0.000 - / 63.064 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is required to support fleet requirements that take into account the aircraft inventory, maintenance cycle and aircraft installed Cartridge Actuated Devices/Propellant Actuated Devices (CAD/PAD) service life, on-hand inventory, procurement lead-time, historical costs and projected contract delivery date. Funding is also required for Integrated Logistics, Reliability Life which tests the life of propellant, Production Engineering Support and lot acceptance testing. Quality Assurance and Product Improvement Programs are used to address second source qualification, address safety of design and quality manufacturing efforts. Obsolescence identifies and qualifies replacement propellants for CAD/PAD due to obsolescence of ingredients and/or diminishing sources of supply. The yearly requirements are modeled based upon the active aircraft in the OPNAV A-II Aircraft Inventory Budget, which feeds into the CAD/PAD Requirements Determination Module (RDM). The RDM accounts for the changing number of aircraft, platform availability, and unique component service lives of all procured commodities and respective quantities, which vary from year to year. LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 3 of 6 P-1 Line #6 Volume 1 - 65 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) 1) Hardware-Stores Release & Hardware Safety Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Cartridge Actuated Devices/Propellant Act Devices FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (1) A - - 10.700 - - 4.606 - - 5.558 - - 3.174 - - - - - 3.174 A - - 6.535 - - 4.708 - - 0.329 - - 0.598 - - - - - 0.598 (4) A - - 19.960 - - 17.544 - - 8.284 - - 4.295 - - - - - 4.295 1.4) AV-8B A - - 2.212 - - 0.995 - - - - - - - - - - - - 1.5) F/A-18 & EA-18 A - - 47.637 - - 16.361 - - 27.276 - - 26.726 - - - - - 26.726 (6) A - - 10.132 - - 5.282 - - 5.466 - - 4.551 - - - - - 4.551 1.7) Other Platforms A - - 11.821 - - 6.823 - - 9.120 - - 8.222 - - - - - 8.222 - - 108.997 - - 56.319 - - 56.033 - - 47.566 - - - - - 47.566 - - 3.597 - - 0.293 - - 0.147 - - 0.147 - - - - - 0.147 1.1) T-6 (2) 1.2) T-38/F-5 1.3) V-22 (3) (5) 1.6) T-45 (7) Subtotal: 1) Hardware-Stores Release & Hardware Safety 2) (Q8800) Intergrated Logistics Support 2.1) Stores Release ILS A 2.2) Safety ILS A - - 12.133 - - 0.962 - - 0.802 - - 0.802 - - - - - 0.802 2.3) Misc. Devices ILS A - - 5.081 - - 0.349 - - 0.202 - - 0.202 - - - - - 0.202 - - 20.811 - - 1.604 - - 1.151 - - 1.151 - - - - - 1.151 - - 1.928 - - 0.154 - - 0.147 - - 0.147 - - - - - 0.147 - - 5.135 - - 0.341 - - 0.334 - - 0.337 - - - - - 0.337 - - 2.853 - - 0.184 - - 0.180 - - 0.181 - - - - - 0.181 - - 9.916 - - 0.679 - - 0.661 - - 0.665 - - - - - 0.665 - - 11.720 - - 0.550 - - 0.539 - - 0.539 - - - - - 0.539 - - 55.677 - - 4.749 - - 4.654 - - 4.215 - - - - - 4.215 - - 14.743 - - 1.128 - - 1.065 - - 1.086 - - - - - 1.086 - - 82.140 - - 6.427 - - 6.258 - - 5.840 - - - - - 5.840 - - 1.940 - - 0.162 - - 0.161 - - 0.162 - - - - - 0.162 Subtotal: 2) (Q8800) Intergrated Logistics Support 3) (Q8820) Reliability Life 3.1) Stores Release Reliability Life A 3.2) Safety Reliability Life A 3.3) Misc. Devices Reliability Life A Subtotal: 3) (Q8820) Reliability Life 4) (Q8830) Production Engineering 4.1) Stores Release PES A 4.2) Safety PES A 4.3) Misc. Devices PES A Subtotal: 4) (Q8830) Production Engineering 5) (Q8840) Quality Assurance 5.1) Stores Release QA A LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 4 of 6 P-1 Line #6 Volume 1 - 66 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ FY 2025 Total Cost FY 2026 Total Cost Aggregated Items Title: Cartridge Actuated Devices/Propellant Act Devices FY 2027 Base Total Cost FY 2027 OOC Total Cost FY 2027 Total Total Cost Total Cost Item Number / Title [DODIC] ID CD 5.2) Safety QA A - - 6.583 - - 0.507 - - 0.495 - - 0.504 - - - - - 0.504 5.3) Misc. Devices QA A - - 2.787 - - 0.192 - - 0.195 - - 0.198 - - - - - 0.198 Subtotal: 5) (Q8840) Quality Assurance - - 11.310 - - 0.861 - - 0.851 - - 0.864 - - - - - 0.864 - - 5.602 - - 0.110 - - 0.240 - - 0.028 - - - - - 0.028 - - 34.547 - - 3.000 - - 2.839 - - 2.832 - - - - - 2.832 - - - - - - - - 5.000 - - - - - - - - - - - 9.464 - - 0.432 - - 0.339 - - 0.343 - - - - - 0.343 - - 49.613 - - 3.542 - - 8.418 - - 3.203 - - - - - 3.203 - - 7.024 - - 0.518 - - 0.433 - - 0.441 - - - - - 0.441 - - 16.279 - - 0.882 - - 0.782 - - 0.797 - - - - - 0.797 - - 10.670 - - 0.640 - - 0.556 - - 0.567 - - - - - 0.567 - - 33.973 - - 2.040 - - 1.771 - - 1.805 - - - - - 1.805 - - 3.075 - - 0.466 - - 0.373 - - 0.376 - - - - - 0.376 - - 9.328 - - 1.574 - - 1.383 - - 1.410 - - - - - 1.410 - - 1.653 - - 0.270 - - 0.180 - - 0.184 - - - - - 0.184 - - 14.056 - - 2.310 - - 1.936 - - 1.970 - - - - - 1.970 - MAIS Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) ($ M) 6) (Q8850) Product Improvement 6.1) Stores Release PIP A 6.2) Safety PIP A 6.3) Digital Twin AI A Network (8) 6.4) Misc. Devices PIP A Subtotal: 6) (Q8850) Product Improvement 7) (Q8860) Acceptance Testing 7.1) Stores Release Acceptance Testing A 7.2) Safety Acceptance Testing A 7.3) Misc. Devices Acceptance Testing A Subtotal: 7) (Q8860) Acceptance Testing 8) (Q8870) Obsolescence 8.1) Stores Release Obsolescence A 8.2) Safety A Obsolescence (9) 8.3) Misc. Devices Obsolescence A Subtotal: 8) (Q8870) Obsolescence 9) Prior Years 9.1) Prior Years Cumulative Funding A - - 936.542 - - - - - - - - - - - - - - Subtotal: 9) Prior Years - - 936.542 - - - - - - - - - - - - - - - Total - - 1,267.358 - - 73.782 - - 77.079 - - 63.064 - - - - - 63.064 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 5 of 6 P-1 Line #6 Volume 1 - 67 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0180 / Cartridge Actuated Devices/Propellant Act Devices Aggregated Items Title: Cartridge Actuated Devices/Propellant Act Devices (1) Hardware-Stores Release & Hardware Safety- Stores Release cartridges are utilized to release weapons and other stores from aircraft. This includes MF64, MT95/JM92, and MD65. Hardware Safety Items used in ejection seats to include thermal batteries, parachute deployed rocket motors, under seat rocket motors, aircrew and deck crew inflators, primary and secondary cartridges, DFIR doors, Navy Aircrew Common Ejection Seats (NACES), and Fire Suppression Gas Generators. Additional items procured under the hardware safety include Safety and arming devices, sequence controls, shielded mild detonating cords, initiators, thrusters, fire extinguisher cartridges, rocket motors, catapults, and more, are used in aircraft emergency escape and safety systems. These explosives/energetics have finite service lives and are replaced during scheduled maintenance. An aircraft may be grounded if a single one of these items does not meet service life recommendations and cannot be extended. (2) 1.1) T-6 Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Under Seat Rocket Motor, Impulse Cartridge, Internal Canopy Mechanical Actuated Initiator, Seat Movement Mechanical Actuated Initiator, External Canopy Mechanical Actuated Initiator, Donor Assembly, Manifolds, Shielded Mild Detonating Cord Transfer Line, Holder Assembly, and Digital Inline Timers. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (3) 1.2) T-38/F-5 Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Under Seat Rocket Motor, Impulse Cartridge, Cartridge Actuated Initiator Internal Canopy Mechanical Actuated Initiator, Seat Movement Mechanical Actuated Initiator, External Canopy Mechanical Actuated Initiator, Donor Assembly, Digital Inline Timers and Small-Column Insulated Delay. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (4) 1.3) V-22 Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Internal Canopy Mechanical Actuated Initiator, External Canopy Mechanical Actuated Initiator, Gas Generators, Canopy and Hatch Shape Charge Assemblies, Thin Linear Explosive Ballistic Transfer Lines, Fire Extinguisher Cartridge and Impulse Cartridge. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (5) 1.5) F/A-18 & EA-18 Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Thermal Battery, Under Seat Rocket Motor, Impulse Cartridge, Internal Canopy Mechanical Actuated Initiator, Seat Movement Mechanical Actuated Initiator, Gas Generator, Digital Inline Timers, Fire Extinguisher Cartridge, Small-Column Insulated Delay and Shielded Mild Detonating Cords. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (6) 1.6) T-45 Funding supports procurement of cartridge actuated and propellant actuated devices. Examples of items used on this aircraft include: Under Seat Rocket Motor, Impulse Cartridge, Internal Canopy Mechanical Actuated Initiator, Seat Movement Mechanical Actuated Initiator, Digital Inline Timers and Small-Column Insulated Delay. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (7) 1.7) Other Platforms Funding supports procurement of cartridge actuated and propellant actuated devices for all other platforms not specifically called out in the cost elements above. Devices consist of hundreds of unique components; the unit cost varies based on Economic Order Quantities, which vary from budget to budget for planned procurements. Fluctuations in requirements across the FYDP are based on the Fleet's actual need. (8) 6.3) Digital Twin AI Network: FY26 Congressional Add will procure, validate, and migrate to the cloud a digital twin of Cartridge Actuated Devices/Propellant Actuated Devices (CAD/PAD) that use double-base propellants while providing real-time health monitoring of deployed devices based on the environmental exposure. (9) 8.2) Obsolescence identifies and qualifies replacement propellants for CAD/PAD due to obsolescence of ingredients and/or diminishing sources of supply. LI 0180 - Cartridge Actuated Devices/Propellant Ac... Navy UNCLASSIFIED Page 6 of 6 P-1 Line #6 Volume 1 - 68 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Program Elements for Code B Items: N/A Other Related Program Elements: 0604270N, 0206138M, 0204161N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,923.079 1,923.079 1,923.079 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 124.208 124.208 124.208 95.398 95.398 95.398 121.059 - 0.000 - 121.059 - 0.000 - 121.059 0.000 121.059 121.059 121.059 133.891 133.891 133.891 136.819 136.819 136.819 139.596 139.596 139.596 To FY 2031 Complete 142.453 Continuing 142.453 142.453 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Air Expendable Countermeasures (AECM) line provides funding for procurement of countermeasure self-protection devices for all United States Navy (USN) and United States Marine Corps (USMC) tactical, rotary and other fixed-wing aircraft. AECM supports fleet aircrew training, readiness and operational combat requirements for all USN and USMC aircraft. Delivering airborne defensive Electronic Warfare (EW) self-protection solutions enables the global warfighter success against an evolving adversary. In FY2022, the AECM program began Common Carriage (CC) procurements to standardize countermeasures across all Services and increase operability across multiple platforms. The CC solution (square form factor) permits aircraft to carry additional, more advanced countermeasures resulting in increased readiness/ capability/lethality/survivability against current and emerging threat systems. CC will utilize Research, Development, Test & Evaluation, Navy, (RDT&E,N) Program Element 0604270N, Project Unit 3309 and Aircraft Procurement, Navy, Modification, Program Element: 0204161N, Operational Safety Improvement Program 006-00. The AECM Program is divided into the following threat related groupings: (1) Active Jammers (2) Infrared (IR) Decoys (3) associated Impulse Cartridges (4) Chaff Countermeasures and (5) F-35 Countermeasures. ACTIVE JAMMERS: Dual Band Decoy (DBD) is a future active jammer which began with a Demonstration of Existing Technologies contract that awarded in FY2019 and an Engineering, Manufacturing Development (EMD) contract that awarded in FY2023. DBD will replace the current active jammer Fiber Optic Towed Decoy (FOTD) and significantly improve F/A-18E/F survivability against emerging radarguided threats. The FOTD, when integrated with the rest of the F/A-18E/F EW suite (i.e., ALQ-214, ALR-67(V)3, ALE-47) and with the associated cockpit controls, displays and other avionics, significantly improves the survivability of the host aircraft in a Radio Frequency (RF) threat environment. Integrated Defensive Electronic Countermeasure Radio Frequency Countermeasure (RFCM) has transitioned to Block 4 which utilizes FOTD integrated hardware to include Electronic Frequency Converter (EFC) and Integrated Multi-Purpose Launch Controller (IMPLC). DBD will utilize RDT&E,N, Program Element 0604270N, Project Unit 2175. DBD production replaces the FOTD in FY2025. ALQ-260 Active Expendable Device (AED) is a self-contained, free fall active RFCM decoy providing enhanced multi-platform self-protection capability against Surface-to-Air Missiles (SAM) and Air-to-Air Missiles (AAM) threats. ALQ-260 provides aircrew with tailored solutions in a dense RF engagement environment and replaces the Gen-X legacy free fall active RFCM with modern hardware and techniques for enhanced capability. Development of an AED began with US Army DoD Ordnance Technology Consortium. Further development continued in FY2024 using RDT&E,N, Program Element 0604270N, Project Unit 3309. ALQ-260 is used on F-35B/C aircraft and will be used on F/A-18E/F. Procurements of ALQ-260 began in FY2025 to satisfy urgent F-35 fleet requirements in response to a newly fielded RF missile guided threat system. IR DECOYS: The MJU-32/38/49 are currently used by all aircraft, except the KC130J/T, UC-35D and F-35B/C, to provide self-protection from SAM and AAM IR missiles. The MJU-61/64 are used on the KC-130J/T, UC-35D and F-35B/C aircraft to provide self-protection from SAM and AAM IR missiles. The SM875 is a dedicated, low cost training device. The MJU-57 provides a kinematic IR countermeasure to defeat specific Man-Portable Air Defense Systems (MANPADS) used on the F/A-18, MV-22, P-8, UC-12W and KC-130J. The MJU-66 is an advanced spectral countermeasure in support of KC-130J/T and UC-35D. The MJU-67 Multi-spectral flare provides an enhanced spectral signature required for USN/USMC aircraft self-protection against accelerated proliferation of advanced MANPADS. The procurement mix LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 1 of 23 P-1 Line #7 Volume 1 - 69 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Program Elements for Code B Items: N/A Other Related Program Elements: 0604270N, 0206138M, 0204161N Line Item MDAP/MAIS Code: N/A of CC (square form factor) and traditional (round form factor) countermeasures will vary as aircraft transition to square form factor dispensers. In the CC solution, MJU-76, MJU-77 and MJU-78 are equivalent to MJU-57, MJU-38 and MJU-67 respectively. In addition to these CC devices, MJU-61 is a square form factor IR Decoy and procurements will continue to support the CC solution. In FY2025, MJU-76 procurements replaced F-35 unique countermeasure MJU-68 procurements to standardize the Kinematic flare across platforms. IMPULSE CARTRIDGES: Used to propel the self-protection devices away from the aircraft. The CCU-136 is used by F-35 for ALE-70 and all other all airframes except the KC-130J/T and UC-35D. The CCU-145 is used on KC-130J/T, UC-35D and F-35B/C. Impulse Cartridge procurements transition to CCU-145 to accommodate the CC solution for square form factor devices. The CCU-41 is used on F/A-18E/F for deploying ALE-50 AAED. The CCM19 MK2 is used on F-35 and F/A-18E/F for deploying ALQ-260 AED. CHAFF COUNTERMEASURES: The RR-129/144 are operational devices used on all USN/USMC aircraft platforms, except the USMC KC-130J/T, UC-35D and F-35B/C in a RF threat environment. The RR-170 is the operational device procured in support of the KC-130J/T and UC-35D. The RR-144 is also used as a round form factor RF training device and RR-188 is a square form factor RF dedicated training device that does not interfere with Federal Aviation Administration tracking radars. In the CC solution, RR-170 and RR-188 are equivalent to RR-129 and RR-144 respectively. RR-202 and RR-203 are new advanced RF passive countermeasures used against current and advancing SAM and AAM to provide high scattering radar Cross Section capability to platforms with CC square expendable form factor. Advanced RF passive countermeasure RR-202 procurements began in FY2025 and RR-203 will begin in FY2026. Development began using Small Business Innovation Research program. Further development continued in FY2024 using RDT&E,N, Program Element 0604270N, Project Unit 3309. F-35 COUNTERMEASURES: PMA-272, operating under a PEO(JSF)-PEO(T) Memorandum of Agreement, procures F-35 countermeasures for all DoD and global participants under a combined contracting strategy to gain unit price efficiencies while meeting global operational requirements. F-35 Countermeasures include unique countermeasures that provide self-protection for F-35 aircraft in IR and RF devices. ALE-70 is an active jammer which significantly improves F-35 survivability against radar-guided threats. The RR-198/AL is a passive RF countermeasure addressing survivability against emergent advanced RF threats on F-35B/C aircraft. The RR-199/AL is a dedicated, low-cost chaff training device for F-35. In addition to F-35B/C unique countermeasures, the MJU-61 serves as a low-cost F-35B/C training device. In FY2025, MJU-68 transitioned from the F-35 countermeasure suite and funding was realigned to MJU-76 square form factor IR Decoy device to support inventory objectives. FY2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). DON has received $57.121M towards procurements for the replacement of Navy stock. $49.460M for DBD (241 qty), $6.797M for ALQ-260 (187 qty), $0.009M for MJU-61 (93 qty), $0.743M for MJU-67 (1,991 qty), $0.006M for MJU-76, $0.045M for CCU-136 (10,345 qty), $0.002M for CCU-145 (347 qty) and $0.059M for RR-129 (3,706). LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 2 of 23 P-1 Line #7 Volume 1 - 70 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Program Elements for Code B Items: N/A Other Related Program Elements: 0604270N, 0206138M, 0204161N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Air Expendable Countermeasures P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,923.079 - / 124.208 - / 95.398 - / 121.059 - / 1,923.079 - / 124.208 - / 95.398 - / 121.059 - / - - / 121.059 / 0.000 - / 121.059 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In accordance with ORD: #512-88-89 dated 28 May 1999, AECM program is tasked with maintaining an operationally effective mixture of countermeasures that can degrade and/or neutralize the effectiveness of current and/or projected threats and provide pre-emptive, area and point source devices that must be compatible with Night Vision Goggles. ORD: #512-88-89 mandates Product Improvement Program (PIP) and Production Engineering Support (PES) to ensure expendables are cost effective, environmentally friendly and Hazards of Electromagnetic Radiation to Ordnance safe. The AECM program buys to budget based on actual fleet usage, fleet forecasted usage and best-negotiated pricing against all airborne expendable types. FY2027 baseline funding is required to procure Active Jammers, IR Decoys, Impulse Cartridges, Chaff Countermeasures, F-35B/C Countermeasures and associated support for USN and USMC tactical, rotary and other fixed-wing aircraft to meet Fleet inventory level requirements, based on Naval Munitions Requirements Process (NMRP). These proven countermeasure devices provide pre-emptive or terminal and reactive self-protection solutions for all USN and USMC strike, assault, rotary wing, and other fixed wing aircraft from RF or IR guided missile attack and other advanced threats. FY2027 baseline funding supports DBD, F-35 Countermeasures inventory shortfalls, USN and USMC CC and USMC procurements to address known shortfalls of round countermeasures. DBD replaces the ALE-55 FOTD whose last procurement was in FY2020. DBD continues integration efforts with EFC and IMPLC. DBD significantly improves F/A-18E/F survivability against emerging radar-guided threats. As part of the CC solution, square form factor IR Decoy devices (MJU-76, MJU-77 and MJU-78) and advanced RF passive chaff countermeasures (RR-202 and RR-203), will standardize countermeasures across Services and increase operability across multiple platforms to support initial fleet load out and buildup of inventory to established requirement level. FY2027 Baseline funding in the amount of $1.898M is provided for the replenishment of the following types of countermeasures: $1.436M for IR Decoys (9,591 qty), RF Chaff (2,223 qty) and Impulse Cartridges (11,814 qty). LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 3 of 23 P-1 Line #7 Volume 1 - 71 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Air Expendable Countermeasures FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) ACTIVE JAMMERS 1.1) ALE-50 (AAED) A 1.2) ALE-55 (FOTD) A 1.3) DUAL BAND DECOY (2)(†) 1.4) DUAL BAND DECOY TECHNICAL SUPPORT (3) 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE A A (4)(†) Subtotal: 1) ACTIVE JAMMERS 79,935.29 - 54.095 - - - - - - - - - - - - - - - 3,029 242.124 - - - - - - - - - - - - - - - 204 42.596 - 1.976 340 9.614 - - - - - 8.350 255 7.184 - 311.753 28,172.55 - 204,300.00 293 59.860 204,712.00 201 41.147 208,806.24 204 42.596 - - - - 0.617 - 1.936 - 1.976 - - - 584 17.373 316 9.093 340 9.614 - - - - - 77.850 - - 52.176 - - 54.186 - - - - - 54.186 - 29,747.49 - 28,775.32 - 28,275.09 208,806.24 - 28,275.09 2) IR DECOYS 2.1) MJU-32 (5)(†) A 101.86 653,618 66.579 88.41 770 0.068 93.35 3,502 0.327 95.20 30,819 2.934 - - - 95.20 30,819 2.934 2.2) MJU-38 (6)(†) A 136.35 317,364 43.272 - - - 95.46 3,474 0.332 97.36 6,440 0.627 - - - 97.36 6,440 0.627 2.3) MJU-49 A 563.39 370,391 208.673 - - - - - - - - - - - - - - - 2.4) MJU-55 A - 20.105 - - - - - - - - - - - - - - - 2.5) MJU-57 A 320.88 238,913 76.663 - - - - - - - - - - - - - - - 2.6) MJU-61 (7)(†) A 75.46 378,224 28.542 114.61 708 0.081 116.90 5,987 0.700 119.23 28,960 3.453 - - - 119.23 28,960 3.453 2.7) MJU-64 (8) A 89.88 221,173 19.879 - - - - - - - - - - - - - - - 2.8) MJU-66 (9) A 118.30 204,772 24.225 - - - - - - - - - - - - - - - 2.9) MJU-67 (10)(†) A 373.72 233,616 87.307 372.98 24,162 9.012 380.43 21,000 7.989 388.03 16,063 6.233 - - - 388.03 16,063 6.233 2.10) MJU-76 (11)(†) A 229.97 66,399 15.270 235.57 24,880 5.861 240.28 19,535 4.694 244.04 36,965 9.021 - - - 244.04 36,965 9.021 2.11) MJU-77 (12)(†) A 94.66 52,545 4.974 107.10 18,086 1.937 109.24 670 0.073 111.42 21,602 2.407 - - - 111.42 21,602 2.407 2.12) MJU-78 (13)(†) A 365.64 11,607 4.244 414.84 7,538 3.127 380.43 6,403 2.436 431.59 17,702 7.640 - - - 431.59 17,702 7.640 A 31.12 2,625,698 81.716 - - - - - - - - - - - - - - - 681.449 - - 20.086 - - 16.551 - - 32.315 - - - - - 32.315 2.13) SM875 Subtotal: 2) IR DECOYS - - - 3) IMPULSE CARTRIDGES 3.1) CCU-41 A 8.33 6,000 0.050 - - - - - - - - - - - - - - - (†) A 7.41 7,955,124 58.974 4.31 15,854 0.068 4.39 5,509 0.024 4.47 5,375 0.024 - - - 4.47 5,375 0.024 (14)(†) A 6.09 2,207,557 13.434 5.49 110,873 0.609 5.59 10,000 0.056 5.70 309,375 1.763 - - - 5.70 309,375 1.763 3.2) CCU-136 3.3) CCU-145 3.4) CCM19 MK2 (15)(†) A Subtotal: 3) IMPULSE CARTRIDGES - - - 242.16 1,408 0.341 247.12 1,020 0.252 252.06 1,106 0.279 - - - 252.06 1,106 0.279 - - 72.458 - - 1.018 - - 0.332 - - 2.066 - - - - - 2.066 4) CHAFF COUNTERMEASURES LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 4 of 23 P-1 Line #7 Volume 1 - 72 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ FY 2025 Total Cost FY 2026 Total Cost Aggregated Items Title: Air Expendable Countermeasures FY 2027 Base Total Cost FY 2027 OOC Total Cost (1) FY 2027 Total Total Cost Total Cost Item Number / Title [DODIC] ID CD 4.1) RR-129 (16)(†) A 13.45 820,334 11.030 15.89 3,706 0.059 15.77 5,199 0.082 16.08 28,800 0.463 - - - 16.08 28,800 0.463 4.2) RR-144 (17)(†) A 23.29 1,379,245 32.126 - - - - - - 18.44 28,800 0.531 - - - 18.44 28,800 0.531 4.3) RR-170 (18)(†) A 13.90 422,146 5.867 16.00 7,767 0.124 16.32 2,267 0.037 16.64 92,450 1.538 - - - 16.64 92,450 1.538 4.4) RR-188 (19)(†) A 14.72 91,364 1.345 - - - - - - 14.43 72,210 1.042 - - - 14.43 72,210 1.042 4.5) RR-202 (20)(†) A - - - 459.00 500 0.230 468.18 500 0.234 477.54 4,898 2.339 - - - 477.54 4,898 2.339 4.6) RR-203 (21)(†) A - - - 95.98 6,835 0.656 97.89 8,263 0.809 99.84 15,144 1.512 - - - 99.84 15,144 1.512 - - 50.368 - - 1.069 - - 1.162 - - 7.425 - - - - - 7.425 MAIS Code Unit Cost ($) Subtotal: 4) CHAFF COUNTERMEASURES Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) ($ M) 5) F-35 COUNTERMEASURES A 55,027.05 3,290 181.039 160 9.286 160 9.472 156 9.420 - - - 156 9.420 5.2) MJU-68 A 2,040.98 63,741 130.094 - - - - - - - - - - - - - - - 5.3) MJU-69 A 2,242.67 2,081 4.667 - - - - - - - - - - - - - - - 5.4) CCU-168 A 327.87 2,257 0.740 - - - - - - - - - - - - - - - 5.1) ALE-70 (22)(†) 58,038.70 59,199.47 60,383.45 60,383.45 5.5) RR-198/AL (23)(†) A 91.59 19,499 1.786 95.98 6,782 0.651 97.89 6,783 0.664 99.84 16,877 1.685 - - - 99.84 16,877 1.685 5.6) RR-199/AL (24)(†) A 54.18 10,981 0.595 57.34 959 0.055 58.48 957 0.056 59.64 1,978 0.118 - - - 59.64 1,978 0.118 - - 318.921 - - 9.992 - - 10.192 - - 11.223 - - - - - 11.223 6.1) ACTIVE JAMMERS - - 4.010 - - 0.226 - - 0.232 - - 0.205 - - - - - 0.205 6.2) IR DECOYS - - 38.209 - - 2.825 - - 2.643 - - 2.695 - - - - - 2.695 6.3) IMPULSE CARTRIDGES - - 1.988 - - 0.054 - - 0.055 - - 0.056 - - - - - 0.056 6.4) CHAFF COUNTERMEASURES - - 1.538 - - 0.058 - - 0.059 - - 0.060 - - - - - 0.060 6.5) F-35 COUNTERMEASURES - - 5.455 - - 0.664 - - 0.637 - - 0.496 - - - - - 0.496 Subtotal: 6) INTEGRATED LOGISTICS SUPPORT - - 51.200 - - 3.827 - - 3.626 - - 3.512 - - - - - 3.512 7.1) ACTIVE JAMMERS - - 37.136 - - 2.251 - - 2.614 - - 1.705 - - - - - 1.705 7.2) IR DECOYS - - 86.484 - - 1.909 - - 1.947 - - 1.983 - - - - - 1.983 7.3) IMPULSE CARTRIDGES - - 6.635 - - 0.188 - - 0.191 - - 0.195 - - - - - 0.195 7.4) CHAFF COUNTERMEASURES - - 3.195 - - 0.058 - - 0.059 - - 0.060 - - - - - 0.060 Subtotal: 5) F-35 COUNTERMEASURES 6) INTEGRATED LOGISTICS SUPPORT 7) PRODUCTION ENGINEERING SUPPORT LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 5 of 23 P-1 Line #7 Volume 1 - 73 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years FY 2025 MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Air Expendable Countermeasures FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 7.5) F-35 COUNTERMEASURES - - 16.219 - - 0.810 - - 0.865 - - 0.744 - - - - - 0.744 Subtotal: 7) PRODUCTION ENGINEERING SUPPORT - - 149.669 - - 5.216 - - 5.676 - - 4.687 - - - - - 4.687 8) PRODUCT IMPROVEMENT PROGRAM (25) - - 104.322 - - - - - 0.291 - - 0.343 - - - - - 0.343 8.2) IMPULSE CARTRIDGES - - 12.996 - - - - - 0.053 - - 0.053 - - - - - 0.053 8.3) CHAFF COUNTERMEASURES - - 1.444 - - 0.303 - - 0.309 - - 0.315 - - - - - 0.315 8.4) F-35 COUNTERMEASURES - - 0.409 - - - - - - - - - - - - - - - - - 119.171 - - 0.303 - - 0.653 - - 0.711 - - - - - 0.711 - - 137.526 - - 3.808 - - 3.871 - - 3.949 - - - - - 3.949 - - 17.796 - - - - - 0.100 - - 0.227 - - - - - 0.227 - - 5.966 - - 0.138 - - 0.140 - - 0.192 - - - - - 0.192 8.1) IR DECOYS Subtotal: 8) PRODUCT IMPROVEMENT PROGRAM 9) ACCEPTANCE TEST & EVALUATION 9.1) IR DECOYS 9.2) IMPULSE CARTRIDGES A (27) 9.3) CHAFF COUNTERMEASURES (28) 9.4) F-35 COUNTERMEASURES (26) - - 6.802 - - 0.901 - - 0.919 - - 0.566 - - - - - 0.566 Subtotal: 9) ACCEPTANCE TEST & EVALUATION - - 168.090 - - 4.847 - - 5.030 - - 4.934 - - - - - 4.934 Total - - 1,923.079 - - 124.208 - - 95.398 - - 121.059 - - - - - 121.059 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (a) Unit cost for hardware in FY2027 reflect either actual contract pricing or inflation of previous year's unit cost. (b) Deliveries funded by different fiscal year appropriations occasionally overlap (P21 Delivery Schedule) to ensure inventory goals are met without exceeding maximum production rates. (c) Program buys to budget based on actual fleet usage, fleet forecasted usage and best-negotiated pricing against all airborne expendable types. (d) Support funding levels may vary between Integrated Logistics Support, PES, PIP and Acceptance Test and Evaluation (ATE) in accordance with yearly requirements to support program procurements, production and deliveries to meet fleet need. (2) (DBD) Updated unit cost and procurement quantity profile to align with current DBD program schedule. Production Buy 1 awarded in June 2025 utilizing FY2025 funding, to achieve Initial Operating Capability (IOC). Deliveries funded by different fiscal year appropriations occasionally overlap (P21 Delivery Schedule) to ensure inventory goals are met without exceeding maximum production rates. First production option deliveries are required to meet IOC. Fielding dates necessitate a DBD solution as soon as possible to provide protection against emerging RF guided threats outside the currently protected spectrum. This effort is critical to the survivability and mission accomplishment of the F/A-18E/F Super Hornet. (3) (4) (DBD Technical Support) Increase from FY2026 to FY2027 based on updated technical support cost in latest vendor estimate. (ALQ-260 AED) ALQ-260 AED is an advanced active radio frequency countermeasure designed to counter emerging RF missile guided threats targeting F-35 and F/A-18E/F. This critical defensive capability addresses urgent operational requirements and fleet need. To satisfy the urgent requirement and fleet need, procurement began in FY2025. Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 6 of 23 P-1 Line #7 Volume 1 - 74 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 (5) (6) (7) P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Aggregated Items Title: Air Expendable Countermeasures (1) (MJU-32) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (MJU-38) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (MJU-61) Increase in quantity from FY2026 to FY2027 is due to MJU-64/66 production line shut-down. Funds realigned from MJU-64/66 to MJU-61 supports Fleet need and NMRP levels. Unit cost updated to align with step ladder pricing based on FY2025 actual contract award. (8) (9) (MJU-64) Removed funding due to production line shut-down. (MJU-66) Removed funding due to production line shut-down. (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (MJU-67) Decrease in quantity from FY2026 to FY2027 supports USMC realignment due to Fleet need. (MJU-76) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (MJU-77) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (MJU-78) Unit cost updated to align with step ladder pricing based on FY2025 actual contract award. Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (CCU-145) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (CCM19 MK2) Impulse cartridge required for deploying ALQ-260. To satisfy the urgent requirement and fleet need, funds realigned from ALE-70 and procurement began in FY2025. (RR-129) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (RR-144) Increase from FY2026 to FY2027 due to procurement resuming to support Fleet need and NMRP levels. (RR-170) Increase in quantity from FY2026 to FY2027 to support Fleet need and NMRP levels. (RR-188) Increase from FY2026 to FY2027 due to procurement resuming to support Fleet need and NMRP levels. (RR-202) RR-202 is an advanced RF passive expendable countermeasure, previously procured by USAF, to defeat current and advancing SAM and AAM. Increase in quantity from FY2026 to FY2027 supports Fleet need and is based on NMRP levels. To satisfy high priority urgent fleet requirements critical to counter emerging threats in the near term outside the currently protected spectrum, procurement began in FY2025. (21) (22) (23) (24) (25) (26) (27) (28) (RR-203) Increase in quantity from FY2026 to FY2027 is due to Fleet need and based on NMRP levels. (ALE-70) FY2027 quantities reduced to move funds to ALQ-260 AED to address urgent fleet requirements in response to a newly fielded RF missile guided threat system. (RR-198) Increase in quantity from FY2026 to FY2027 is due to Fleet need and based on NMRP levels. (RR-199) Increase in quantity from FY2026 to FY2027 is due to Fleet need and based on NMRP levels. Increase from FY2026 to FY2027 supports vital IR Decoy product improvement efforts (ATE) Funding varies annually based on countermeasure production deliveries and type of Navy Lot Acceptance Testing required. (Impulse Cartridge) ATE increase from FY2026 to FY2027 to support lot acceptance testing required for increased impulse cartridge procurement quantities. (Chaff Countermeasures) ATE increase from FY2026 to FY2027 to support increased chaff countermeasures procurement quantities. LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 7 of 23 P-1 Line #7 Volume 1 - 75 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Air Expendable Countermeasures Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) (1) RFP Issue Date 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2)(†) 1.3) DUAL BAND DECOY (2)(†) 1.3) DUAL BAND DECOY (2)(†) 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE 2025 (29) BAE SYSTEMS / NASHUA, NH C / FFP NAVAIR Jun 2025 Mar 2027 293 204,300.00 Y Jun 2021 2026 (30) BAE SYSTEMS / NASHUA, NH C / FFP NAVAIR Jun 2026 Oct 2027 201 204,712.00 Y Jun 2021 2027 BAE SYSTEMS / NASHUA, NH C / FFP NAVAIR Jun 2027 Oct 2028 204 208,806.24 Y Jun 2026 (4)(†) 2024 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Jun 2025 Feb 2026 255 28,170.82 Y Sep 2024 (4)(†) 2025 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2024 Aug 2025 584 29,747.49 Y Sep 2024 (4)(†) 2026 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2025 Aug 2026 316 28,775.32 Y Sep 2024 (4)(†) 2027 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2026 Aug 2027 340 28,275.09 Y Sep 2024 2) IR DECOYS 2.1) MJU-32 (5) 2024 Kilgore Flares Co. / Toone, TN C / IDIQ NAVSUP WSS Jun 2024 Jun 2025 18,802 89.73 Y Mar 2020 2.1) MJU-32 (5) 2025 Kilgore Flares Co. / Toone, TN C / IDIQ NAVSUP WSS Aug 2025 Aug 2026 770 88.41 Y Mar 2020 2.1) MJU-32 (5) 2026 TBD / TBD C / IDIQ NAVSUP WSS May 2026 Nov 2027 3,502 93.35 Y May 2025 2.1) MJU-32 (5) 2027 TBD / TBD C / IDIQ NAVSUP WSS May 2027 Nov 2028 30,819 95.20 Y May 2025 2.2) MJU-38 (6) May 2025 May 2026 879 104.56 Y Mar 2020 2.2) MJU-38 (6) 3,474 95.46 Y May 2025 2.2) MJU-38 (6) 2.6) MJU-61 (7) 2.6) MJU-61 (7) 2.6) MJU-61 (7) 2.6) MJU-61 (7) 2.6) MJU-61 (7) 2.9) MJU-67 (10)(†) 2.9) MJU-67 (10)(†) 2024 Kilgore Flares Co. / Toone, TN C / IDIQ NAVSUP WSSNAVSUP WSS 2026 TBD / TBD C / IDIQ NAVSUP WSSNAVSUP WSS May 2026 Nov 2027 2027 TBD / TBD C / IDIQ NAVSUP WSS May 2027 Nov 2028 6,440 97.36 Y May 2025 2023 Kilgore Flares Co. / Toone, TN C / IDIQ NAVSUP WSS Mar 2023 Jan 2024 23,433 94.34 Y Jul 2021 2024 Armtec Countermeasures Co./Kilgore Flares Co. / Camden AR/Toone TN C / IDIQ NAVSUP WSS May 2024 Mar 2025 32,972 96.22 Y Jul 2021 2025 Kilgore Flares Co. / Toone, TN C / IDIQ NAVSUP WSS Mar 2025 Jan 2026 708 114.61 Y Jul 2021 2026 Armtec Countermeasures Co./Kilgore Flares Co. / Camden AR/Toone TN C / IDIQ NAVSUP WSS Mar 2026 Jan 2027 5,987 116.90 Y Jul 2021 2027 TBD / TBD C / IDIQ NAVSUP WSS Feb 2027 Dec 2027 28,960 119.23 Y Feb 2026 2024 Elbit Systems Ltd/ CAAA / Israel/Crane, IN SS / IDIQ NAVSUP WSS Aug 2024 Dec 2025 28,288 365.67 Y Feb 2023 2025 Elbit Systems Ltd/ CAAA / Israel/Crane, IN SS / IDIQ NAVSUP WSS Apr 2025 Aug 2026 24,162 372.98 Y Feb 2023 LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 8 of 23 P-1 Line #7 Volume 1 - 76 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] 2.9) MJU-67 (10)(†) 2.9) MJU-67 (10)(†) 2.10) MJU-76 (11)(†) 2.10) MJU-76 (11)(†) 2.10) MJU-76 (11)(†) 2.10) MJU-76 (11)(†) 2.10) MJU-76 (11)(†) 2.11) MJU-77 (12) 2.11) MJU-77 (12) 2.11) MJU-77 (12) 2.11) MJU-77 (12) 2.11) MJU-77 (12) 2.11) MJU-77 (12) 2.12) MJU-78 O O C P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Method/Type or Funding Vehicle Aggregated Items: Air Expendable Countermeasures Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) (1) RFP Issue Date FY Contractor and Location 2026 Elbit Systems Ltd/ CAAA / Israel/Crane, IN SS / IDIQ NAVSUP WSS Mar 2026 Jul 2027 21,000 380.43 Y Feb 2023 2027 Elbit Systems Ltd/ CAAA / Israel/Crane, IN SS / IDIQ NAVSUP WSS Mar 2027 Jul 2028 16,063 388.03 Y Feb 2023 2023 Crane Army Ammunition Activity / Crane, IN MIPR CRANE, IN Feb 2023 Feb 2025 15,898 226.44 Y Dec 2022 2024 Crane Army Ammunition Activity / Crane, IN MIPR CRANE, IN Feb 2024 Feb 2026 37,001 234.39 Y Dec 2023 (Each) 2025 (31) TBD / TBD C / IDIQ HILL AFB May 2026 May 2027 24,880 235.57 Y Aug 2024 2026 (32) TBD / TBD C / IDIQ HILL AFB May 2026 May 2027 19,535 240.28 Y Aug 2024 2027 TBD / TBD C / IDIQ HILL AFB Mar 2027 Mar 2028 36,965 244.04 Y Aug 2024 2022 Crane Army Ammunition Activity / Crane, IN MIPR CRANE, IN Dec 2021 Jun 2023 15,120 88.50 Y Dec 2021 2023 Armtec Countermeasures Co. / Camden, AR C / IDIQ NAVSUP WSS Sep 2023 Mar 2025 19,940 90.26 Y Jan 2023 2024 Armtec Countermeasures Co. / Camden, AR C / IDIQ NAVSUP WSS Jun 2024 Dec 2025 17,485 105.00 Y Jan 2023 2025 Armtec Countermeasures Co. / Camden, AR C / IDIQ NAVSUP WSS Mar 2025 Sep 2026 18,086 107.10 Y Jan 2023 2026 Armtec Countermeasures Co. / Camden, AR C / IDIQ NAVSUP WSS Apr 2026 Oct 2027 670 109.24 Y Jan 2023 2027 Armtec Countermeasures Co. / Camden, AR C / IDIQ NAVSUP WSS Mar 2027 Sep 2028 21,602 111.42 Y Jan 2023 (13)(†) 2024 Elbit Systems Ltd / Israel SS / IDIQ NAVSUP WSS Aug 2024 Dec 2025 11,607 365.67 Y Feb 2023 2.12) MJU-78 (13)(†) 2025 Elbit Systems Ltd / Israel SS / IDIQ NAVSUP WSS Apr 2025 Aug 2026 7,538 414.84 Y Feb 2023 2.12) MJU-78 (13)(†) 2026 Elbit Systems Ltd / Israel SS / IDIQ NAVSUP WSS Mar 2026 Jul 2027 6,403 380.43 Y Feb 2023 2.12) MJU-78 (13)(†) 2027 Elbit Systems Ltd / Israel SS / IDIQ NAVSUP WSS Mar 2027 Jul 2028 17,702 431.59 Y Feb 2023 2024 Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2026 Jul 2027 2,886 4.45 Y Aug 2024 3) IMPULSE CARTRIDGES 3.2) CCU-136 3.2) CCU-136 3.2) CCU-136 3.2) CCU-136 2025 (33) Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2026 Jul 2027 15,854 4.31 Y Aug 2024 2026 (34) Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2026 Jul 2027 5,509 4.39 Y Aug 2024 Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2027 Jul 2028 5,375 4.47 Y Aug 2024 2027 LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 9 of 23 P-1 Line #7 Volume 1 - 77 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] 3.3) CCU-145 (14) 3.3) CCU-145 (14) 3.3) CCU-145 (14) O O C FY Contractor and Location P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Method/Type or Funding Vehicle Aggregated Items: Air Expendable Countermeasures Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) (1) RFP Issue Date 2025 (35) Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2026 Jul 2027 110,873 5.49 Y Aug 2024 2026 (36) Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2026 Jul 2027 10,000 5.59 Y Aug 2024 2027 Valor Tactical Innovation / GRAND JUNCTION, CO C / IDIQ NAVSUP WSS Feb 2027 Jul 2028 309,375 5.70 Y Aug 2024 3.4) CCM19 MK2 (15) 2025 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2024 Aug 2025 1,408 242.16 Y Sep 2024 3.4) CCM19 MK2 (15) 2026 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2025 Aug 2026 1,020 247.12 Y Sep 2024 3.4) CCM19 MK2 (15) 2027 Leonardo UK LTD / Luton, UK C / FFP NAVAIR Dec 2026 Aug 2027 1,106 252.06 Y Sep 2024 2024 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Sep 2024 May 2025 58,715 15.19 Y Jul 2023 2025 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Jul 2025 Mar 2026 3,706 15.89 Y Jul 2023 2026 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS May 2026 Jan 2027 5,199 15.77 Y Jul 2023 2027 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Feb 2027 Oct 2027 28,800 16.08 Y Jul 2023 2027 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Feb 2027 Oct 2027 28,800 18.44 Y Jul 2023 2024 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Mar 2024 Nov 2024 68,383 15.69 Y Jul 2023 2025 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Oct 2025 Jun 2026 7,767 16.00 Y Jul 2023 2026 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Oct 2025 Jun 2026 2,267 16.32 Y Jul 2023 2027 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Mar 2027 Nov 2027 92,450 16.64 Y Jul 2023 2024 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Oct 2025 Jun 2026 16,458 13.61 Y Jul 2023 2027 Armtec Countermeasures Co. / Lillington, NC C / IDIQ NAVSUP WSS Mar 2027 Nov 2027 72,210 14.43 Y Jul 2023 2025 Armtec Countermeasures Co. / Lillington, NC SS / IDIQ HILL AFB May 2025 Nov 2026 500 459.00 Y Nov 2024 2026 Armtec Countermeasures Co. / Lillington, NC SS / IDIQ HILL AFB May 2026 Nov 2027 500 468.18 Y Nov 2024 2027 Armtec Countermeasures Co. / Lillington, NC SS / IDIQ HILL AFB May 2027 Nov 2028 4,898 477.54 Y Nov 2024 4) CHAFF COUNTERMEASURES 4.1) RR-129 (16) 4.1) RR-129 (16) 4.1) RR-129 (16) 4.1) RR-129 (16) 4.2) RR-144 (17) 4.3) RR-170 (18) 4.3) RR-170 (18) 4.3) RR-170 (18) 4.3) RR-170 (18) 4.4) RR-188 (19) 4.4) RR-188 (19) 4.5) RR-202 (20) 4.5) RR-202 (20) 4.5) RR-202 (20) LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 10 of 23 P-1 Line #7 Volume 1 - 78 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] 4.6) RR-203 (21) 4.6) RR-203 (21) 4.6) RR-203 (21) O O C P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Method/Type or Funding Vehicle Armtec Countermeasures Co. / Lillington, NC 2026 Aggregated Items: Air Expendable Countermeasures Location of PCO Award Date Date of First Delivery SS / FFP NAVSUP WSS Dec 2025 Jun 2027 6,835 95.98 Y Nov 2024 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVSUP WSS Dec 2025 Jun 2027 8,263 97.89 Y Nov 2024 2027 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVSUP WSS Feb 2027 Aug 2028 15,144 99.84 Y Nov 2024 Feb 2025 512 57,020.34 Y Mar 2018 FY 2025 Contractor and Location (37) Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) (1) RFP Issue Date 5) F-35 COUNTERMEASURES (†) 5.1) ALE-70 (22)(†) 2023 BAE Systems / Nashua, NH SS / FFP NAVAIR Jan 2023 5.1) ALE-70 (22)(†) 2024 BAE Systems / Nashua, NH SS / FFP NAVAIR Sep 2024 Oct 2026 480 57,592.99 Y Jun 2023 5.1) ALE-70 (22)(†) 2025 BAE Systems / Nashua, NH SS / FFP NAVAIR Jan 2025 Feb 2027 160 58,038.70 Y Jun 2023 5.1) ALE-70 (22)(†) 2026 BAE Systems / Nashua, NH SS / FFP NAVAIR Jan 2026 Feb 2028 160 59,199.47 Y Jun 2023 5.1) ALE-70 (22)(†) 2027 BAE Systems / Nashua, NH SS / FFP NAVAIR Jan 2027 Feb 2029 156 60,383.45 Y Jun 2023 2025 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Mar 2025 Mar 2026 6,782 95.98 Y Sep 2023 2026 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Feb 2026 Feb 2027 6,783 97.89 Y Sep 2023 2027 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Mar 2027 Mar 2028 16,877 99.84 Y Sep 2023 2025 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Mar 2025 Mar 2026 959 57.34 Y Sep 2023 2026 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Feb 2026 Feb 2027 957 58.48 Y Sep 2023 2027 Armtec Countermeasures Co. / Lillington, NC SS / FFP NAVAIR Mar 2027 Mar 2028 1,978 59.64 Y Sep 2023 5.5) RR-198/AL (23) 5.5) RR-198/AL (23) 5.5) RR-198/AL (23) 5.6) RR-199/AL (24) 5.6) RR-199/AL (24) 5.6) RR-199/AL (24) indicates the presence of a P-21 Footnotes: (29) (DBD) FY2025 funds utilized on Production Buy 1 to achieve IOC. FY2025 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). DON has received $49.460M for the procurement of DBD (241 qty) for the replacement of Navy stock. (30) (31) (32) (33) (34) (35) (DBD) FY2026 Production Buy 2 award planned for 3QFY26. (MJU-76) FY2025 contract award moved to 2QFY26 due to USAF contract strategy change to accommodate additional DCAA requirements. (MJU-76) FY2025 and FY2026 quantities to be combined buy. (CCU-136) FY2025 contract award moved to 2QFY26 to allow time to complete DCAA audit. (CCU-136) Combined FY2024, FY2025 and FY2026 funds on FY2026 contract which awarded February 2026. (CCU-145) FY2025 contract award moved to 2QFY26 to allow time to complete DCAA audit. LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 11 of 23 P-1 Line #7 Volume 1 - 79 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 (36) (37) P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Aggregated Items: Air Expendable Countermeasures (1) (CCU-145) Combined FY2025 and FY2026 funds on FY2026 contract which awarded February 2026. (RR-203) FY2025 Contract award date revised due to changing contract strategy and agency. Will combine FY2025 and FY2026 funding to improve economic order quantity. LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 12 of 23 P-1 Line #7 Volume 1 - 80 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Air Expendable Countermeasures Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 Calendar Year 2022 O C T (1) M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2) 4 2025 NAVY .293 .000 .293 .293 4 2026 NAVY .201 .000 .201 .201 4 2027 NAVY .204 .000 .204 .204 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE (4) 5 2024 NAVY .255 .000 .255 5 2025 NAVY .584 .000 .584 .255 .584 5 2025 AF (‡) 1.075 .000 1.075 1.075 5 2025 Total 1.659 .000 1.659 1.659 5 2026 NAVY .316 .000 .316 .316 5 2026 AF (‡) .268 .000 .268 .268 5 2026 Total .584 .000 .584 .584 5 2027 NAVY .340 .000 .340 .340 5 2027 AF (‡) .492 .000 .492 .492 5 2027 Total .832 .000 .832 .832 2) IR DECOYS 2.9) MJU-67 (10) Prior Years Deliveries: 205328 6 2024 NAVY 28.288 .000 28.288 28.288 6 2025 NAVY 24.162 .000 24.162 24.162 6 2026 NAVY 21.000 .000 21.000 21.000 6 2027 NAVY 16.063 .000 16.063 16.063 2.10) MJU-76 (11) Prior Years Deliveries: 13500 7 2023 NAVY 15.898 .000 15.898 7 2024 NAVY 37.001 .000 37.001 37.001 8 2025 NAVY 24.880 .000 24.880 24.880 8 2026 NAVY 19.535 .000 19.535 19.535 8 2027 NAVY 36.965 .000 36.965 36.965 2.12) MJU-78 A - - - - - - - - 15.898 (13) O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 81 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C Aggregated Items: Air Expendable Countermeasures Fiscal Year 2022 (1) B A L A N C E Fiscal Year 2023 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT NAVY 11.607 .000 11.607 11.607 2025 NAVY 7.538 .000 7.538 7.538 9 2026 NAVY 6.403 .000 6.403 6.403 9 2027 NAVY 17.702 .000 17.702 17.702 M F R # FY 9 2024 9 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 5) F-35 COUNTERMEASURES 5.1) ALE-70 (22) Prior Years Deliveries: 2298 10 2023 NAVY .512 .000 .512 A - - - - - - - - - 10 2023 AF (‡) .888 .000 .888 A - - - - - - - - - .512 .888 10 2023 Total 1.400 .000 1.400 - - - - - - - - - 1.400 10 2024 NAVY .480 .000 .480 .480 10 2024 AF (‡) .440 .000 .440 .440 10 2024 Total .920 .000 .920 .920 10 2025 NAVY .160 .000 .160 .160 10 2025 AF (‡) .352 .000 .352 .352 10 2025 Total .512 .000 .512 .512 10 2026 NAVY .160 .000 .160 .160 10 2026 AF (‡) .324 .000 .324 .324 10 2026 Total .484 .000 .484 .484 10 2027 NAVY .156 .000 .156 .156 10 2027 AF (‡) .352 .000 .352 .352 10 2027 Total .508 .000 .508 .508 O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 82 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Air Expendable Countermeasures Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 Calendar Year 2024 O C T (1) M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2) 4 2025 NAVY .293 .000 .293 4 2026 NAVY .201 .000 .201 .201 4 2027 NAVY .204 .000 .204 .204 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE A - - - - .293 (4) 5 2024 NAVY .255 .000 .255 A - - - - .255 5 2025 NAVY .584 .000 .584 A - - - - - - - - .049 .049 .486 5 2025 AF (‡) 1.075 .000 1.075 A - - - - - - - - .089 .089 .897 5 2025 Total 1.659 .000 1.659 - - - - - - - - .138 .138 1.383 5 2026 NAVY .316 .000 .316 .316 5 2026 AF (‡) .268 .000 .268 .268 5 2026 Total .584 .000 .584 .584 5 2027 NAVY .340 .000 .340 .340 5 2027 AF (‡) .492 .000 .492 .492 5 2027 Total .832 .000 .832 .832 2) IR DECOYS 2.9) MJU-67 (10) Prior Years Deliveries: 205328 6 2024 NAVY 28.288 .000 28.288 6 2025 NAVY 24.162 .000 24.162 6 2026 NAVY 21.000 .000 21.000 21.000 6 2027 NAVY 16.063 .000 16.063 16.063 2.10) MJU-76 A - - - - - - - - - - - - - - 28.288 A - - - - - - 24.162 (11) Prior Years Deliveries: 13500 7 2023 NAVY 15.898 .000 15.898 7 2024 NAVY 37.001 .000 37.001 8 2025 NAVY 24.880 .000 24.880 24.880 8 2026 NAVY 19.535 .000 19.535 19.535 8 2027 NAVY 36.965 .000 36.965 36.965 2.12) MJU-78 - - - - - - - - - - - - - - - - 1.324 1.324 1.325 1.325 1.325 1.325 1.325 1.325 5.300 A - - - - - - - - - - - - - - - - - - - - 37.001 (13) O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 83 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C Aggregated Items: Air Expendable Countermeasures Fiscal Year 2024 (1) B A L A N C E Fiscal Year 2025 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT NAVY 11.607 .000 11.607 2025 NAVY 7.538 .000 7.538 9 2026 NAVY 6.403 .000 6.403 6.403 9 2027 NAVY 17.702 .000 17.702 17.702 M F R # FY 9 2024 9 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P A - O C T - N O V - D E C - J A N - F E B - M A R - A P R - M A Y J U N J U L A U G S E P - - - - - - 11.607 A - - - - - - 7.538 5) F-35 COUNTERMEASURES 5.1) ALE-70 (22) Prior Years Deliveries: 2298 10 2023 NAVY .512 .000 .512 - - - - - - - - - - - - - - - - .042 .042 .042 .042 .043 .043 .043 .043 .172 10 2023 AF (‡) .888 .000 .888 - - - - - - - - - - - - - - - - .074 .074 .074 .074 .074 .074 .074 .074 .296 10 2023 Total 1.400 .000 1.400 - - - - - - - - - - - - - - - - .116 .116 .116 .116 .117 .117 .117 .117 .468 10 2024 NAVY .480 .000 .480 A - - - - - - - - - - - - - .480 10 2024 AF (‡) .440 .000 .440 A - - - - - - - - - - - - - .440 10 2024 Total .920 .000 .920 - - - - - - - - - - - - - .920 10 2025 NAVY .160 .000 .160 A - - - - - - - - - .160 10 2025 AF (‡) .352 .000 .352 A - - - - - - - - - .352 10 2025 Total .512 .000 .512 - - - - - - - - - .512 10 2026 NAVY .160 .000 .160 .160 10 2026 AF (‡) .324 .000 .324 .324 10 2026 Total .484 .000 .484 .484 10 2027 NAVY .156 .000 .156 .156 10 2027 AF (‡) .352 .000 .352 .352 10 2027 Total .508 .000 .508 .508 O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 84 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Air Expendable Countermeasures Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 Calendar Year 2026 O C T (1) M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2) 4 2025 NAVY .293 .000 .293 4 2026 NAVY .201 .000 .201 4 2027 NAVY .204 .000 .204 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE - - - - - - - - - - - - - - - - - .024 .024 .024 .024 .024 .024 .024 .125 A - - - - - - - - - - - - - - - - .201 A - - - - .204 (4) 5 2024 NAVY .255 .000 .255 - - - - .022 .022 .022 .021 .021 .021 5 2025 NAVY .584 .098 .486 .049 .049 .049 .049 .049 .049 .048 .048 .048 .048 .021 .021 .021 .021 .021 .021 .000 5 2025 AF (‡) 1.075 .178 .897 .089 .089 .089 .090 .090 .090 .090 .090 .090 .090 5 2025 Total 1.659 .276 1.383 .138 .138 .138 .139 .139 .139 .138 .138 .138 .138 - - - - - - - - - - - - 5 2026 NAVY .316 .000 .316 A - - - - - - - - .027 .027 .027 .027 .026 .026 .026 .026 .026 .026 .026 .026 5 2026 AF (‡) .268 .000 .268 A - - - - - - - - .023 .023 .023 .023 .022 .022 .022 .022 .022 .022 .022 .022 5 2026 Total .584 .000 .584 - - - - - - - - .050 .050 .050 .050 .048 .048 .048 .048 .048 .048 .048 .048 - - .000 5 2027 NAVY .340 .000 .340 A - - - - - - - - .029 .029 .282 5 2027 AF (‡) .492 .000 .492 A - - - - - - - - .041 .041 .410 5 2027 Total .832 .000 .832 - - - - - - - - .070 .070 .692 .000 .000 - - .000 .000 .000 2) IR DECOYS 2.9) MJU-67 (10) Prior Years Deliveries: 205328 6 2024 NAVY 28.288 .000 28.288 - - 2.357 2.357 2.357 2.357 2.358 2.358 2.358 2.358 2.358 2.358 2.356 2.356 6 2025 NAVY 24.162 .000 24.162 - - - - - - - - - - 2.013 2.013 2.013 2.013 2.013 2.013 2.014 2.014 2.014 2.014 2.014 2.014 6 2026 NAVY 21.000 .000 21.000 A - - - - - - - - - - - - - - - - 1.750 1.750 6 2027 NAVY 16.063 .000 16.063 A - - - - - - 2.10) MJU-76 .000 .000 1.750 15.750 - 16.063 (11) Prior Years Deliveries: 13500 7 2023 NAVY 15.898 7 2024 NAVY 37.001 .000 37.001 8 2025 NAVY 24.880 8 2026 NAVY 8 2027 NAVY 2.12) MJU-78 10.598 5.300 1.325 1.325 1.325 1.325 - - - - .000 3.083 3.083 3.083 3.083 3.083 3.083 3.083 3.084 3.084 3.084 3.084 3.084 .000 24.880 A - - - - - - - - - - .000 19.535 .000 19.535 A - - - - - - - - - - 36.965 .000 36.965 - - 2.074 2.074 2.073 2.074 2.074 14.511 - - 1.627 1.628 1.628 1.628 1.628 11.396 A - - - - - - - 36.965 (13) O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 85 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C Aggregated Items: Air Expendable Countermeasures Fiscal Year 2026 (1) B A L A N C E Fiscal Year 2027 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT NAVY 11.607 .000 11.607 - - .968 .968 .968 .967 .967 .967 .967 .967 .967 .967 .967 .967 2025 NAVY 7.538 .000 7.538 - - - - - - - - - - .630 .628 .628 .628 .628 .628 .628 .628 .628 .628 .628 .628 9 2026 NAVY 6.403 .000 6.403 A - - - - - - - - - - - - - - - - .533 .533 .533 4.804 9 2027 NAVY 17.702 .000 17.702 A - - - - - - - 17.702 M F R # FY 9 2024 9 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 .000 5) F-35 COUNTERMEASURES 5.1) ALE-70 (22) Prior Years Deliveries: 2298 10 2023 NAVY .512 .340 .172 .043 .043 .043 .043 10 2023 AF (‡) .888 .592 .296 .074 .074 .074 .074 10 2023 Total 1.400 .932 .468 .117 .117 .117 .117 - - - - - - - - - - - - - - - - - - - - .000 10 2024 NAVY .480 .000 .480 - - - - - - - - - - - - .040 .040 .040 .040 .040 .040 .040 .040 .040 .040 .040 .040 .000 10 2024 AF (‡) .440 .000 .440 - - - - - - - - - - - - .037 .037 .037 .037 .037 .037 .037 .037 .036 .036 .036 .036 .000 10 2024 Total .920 .000 .920 - - - - - - - - - - - - .077 .077 .077 .077 .077 .077 .077 .077 .076 .076 .076 .076 .000 10 2025 NAVY .160 .000 .160 - - - - - - - - - - - - - - - - .012 .012 .012 .012 .012 .012 .012 .012 .064 10 2025 AF (‡) .352 .000 .352 - - - - - - - - - - - - - - - - .032 .032 .032 .032 .028 .028 .028 .028 .112 10 2025 Total .512 .000 .512 - - - - - - - - - - - - - - - - .044 .044 .044 .044 .040 .040 .040 .040 .176 10 2026 NAVY .160 .000 .160 A - - - - - - - - - - - - - - - - - - - - - .160 10 2026 AF (‡) .324 .000 .324 A - - - - - - - - - - - - - - - - - - - - - .324 10 2026 Total .484 .000 .484 - - - - - - - - - - - - - - - - - - - - - .484 10 2027 NAVY .156 .000 .156 A - - - - - - - - - .156 10 2027 AF (‡) .352 .000 .352 A - - - - - - - - - .352 10 2027 Total .508 .000 .508 - - - - - - - - - .508 O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N .000 .000 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 86 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Air Expendable Countermeasures Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT N O V D E C J A N F E B B A L A N C E Fiscal Year 2029 Calendar Year 2028 O C T (1) Calendar Year 2029 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2) 4 2025 NAVY .293 .168 .125 .025 .025 .025 .025 .025 4 2026 NAVY .201 .000 .201 .014 .015 .017 .017 .017 .017 .017 .017 .017 .017 .018 .018 4 2027 NAVY .204 .000 .204 - - - - - - - - - - - - 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE .000 .000 .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 .000 (4) 5 2024 NAVY .255 .255 .000 .000 5 2025 NAVY .584 .584 .000 .000 5 2025 AF (‡) 1.075 1.075 .000 5 2025 Total 1.659 1.659 .000 5 2026 NAVY .316 .316 .000 5 2026 AF (‡) .268 .268 .000 5 2026 Total .584 .584 .000 - - - - - - - - - - 5 2027 NAVY .340 .058 .282 .029 .029 .028 .028 .028 .028 .028 .028 .028 .028 5 2027 AF (‡) .492 .082 .410 .041 .041 .041 .041 .041 .041 .041 .041 .041 .041 5 2027 Total .832 .140 .692 .070 .070 .069 .069 .069 .069 .069 .069 .069 .069 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - .000 2) IR DECOYS 2.9) MJU-67 (10) Prior Years Deliveries: 205328 6 2024 NAVY 28.288 28.288 .000 6 2025 NAVY 24.162 24.162 .000 6 2026 NAVY 21.000 5.250 15.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 6 2027 NAVY 16.063 .000 16.063 - - - - - - - - - 2.10) MJU-76 .000 .000 .000 1.339 1.339 1.339 1.339 1.339 1.339 1.339 1.338 1.338 1.338 1.338 1.338 .000 (11) Prior Years Deliveries: 13500 7 2023 NAVY 15.898 15.898 .000 7 2024 NAVY 37.001 37.001 .000 8 2025 NAVY 24.880 10.369 14.511 2.073 2.073 2.073 2.073 2.073 2.073 2.073 8 2026 NAVY 19.535 8.139 11.396 1.628 1.628 1.628 1.628 1.628 1.628 1.628 8 2027 NAVY 36.965 .000 36.965 - - - - - 3.081 3.081 3.081 3.081 3.081 3.080 3.080 3.080 3.080 3.080 3.080 3.080 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B 2.12) MJU-78 .000 .000 .000 .000 .000 (13) O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B UNCLASSIFIED Page 19 of 23 P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 87 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C Aggregated Items: Air Expendable Countermeasures Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT M F R # FY SERVICE PROC QTY 9 2024 NAVY 11.607 11.607 .000 9 2025 NAVY 7.538 7.538 .000 9 2026 NAVY 6.403 1.599 4.804 9 2027 NAVY 17.702 .000 17.702 N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 Calendar Year 2028 O C T (1) M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 .000 .533 .533 .534 .534 .534 .534 .534 .534 .534 - - - - - - - - - .000 1.476 1.476 1.475 1.475 1.475 1.475 1.475 1.475 1.475 1.475 1.475 1.475 .000 5) F-35 COUNTERMEASURES 5.1) ALE-70 (22) Prior Years Deliveries: 2298 10 2023 NAVY .512 .512 .000 10 2023 AF (‡) .888 .888 .000 .000 10 2023 Total 1.400 1.400 .000 10 2024 NAVY .480 .480 .000 10 2024 AF (‡) .440 .440 .000 10 2024 Total .920 .920 .000 - - - - 10 2025 NAVY .160 .096 .064 .016 .016 .016 .016 10 2025 AF (‡) .352 .240 .112 .028 .028 .028 .028 10 2025 Total .512 .336 .176 .044 .044 .044 .044 - - - - - - - - - - - - 10 2026 NAVY .160 .000 .160 - - - - .012 .012 .012 .012 .012 .012 .012 .012 .016 .016 .016 .016 10 2026 AF (‡) .324 .000 .324 - - - - .027 .027 .027 .027 .027 .027 .027 .027 .027 .027 .027 .027 10 2026 Total .484 .000 .484 - - - - .039 .039 .039 .039 .039 .039 .039 .039 .043 .043 .043 .043 - - - - - - - - .000 10 2027 NAVY .156 .000 .156 - - - - - - - - - - - - - - - - .012 .012 .012 .012 .012 .012 .012 .012 .060 10 2027 AF (‡) .352 .000 .352 - - - - - - - - - - - - - - - - .032 .032 .032 .032 .028 .028 .028 .028 .112 10 2027 Total .508 .000 .508 - - - - - - - - - - - - - - - - .044 .044 .044 .044 .040 .040 .040 .040 .172 F E B M A R A P R M A Y J U N J U L A U G S E P .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N - - - - - - - - - - - - - - - - - - - - .000 .000 .000 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 23 S E P O C T N O V D E C J A N - - - - - - - - .000 .000 .000 P-1 Line #7 Volume 1 - 88 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Air Expendable Countermeasures Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 Calendar Year 2030 O C T (1) M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) ACTIVE JAMMERS 1.3) DUAL BAND DECOY (2) 4 2025 NAVY .293 .293 .000 .000 4 2026 NAVY .201 .201 .000 .000 4 2027 NAVY .204 .204 .000 .000 1.5) ALQ-260 ACTIVE EXPENDABLE DEVICE (4) 5 2024 NAVY .255 .255 .000 .000 5 2025 NAVY .584 .584 .000 .000 5 2025 AF (‡) 1.075 1.075 .000 5 2025 Total 1.659 1.659 .000 5 2026 NAVY .316 .316 .000 5 2026 AF (‡) .268 .268 .000 5 2026 Total .584 .584 .000 5 2027 NAVY .340 .340 .000 5 2027 AF (‡) .492 .492 .000 5 2027 Total .832 .832 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 2) IR DECOYS 2.9) MJU-67 (10) Prior Years Deliveries: 205328 6 2024 NAVY 28.288 28.288 .000 .000 6 2025 NAVY 24.162 24.162 .000 .000 6 2026 NAVY 21.000 21.000 .000 .000 6 2027 NAVY 16.063 16.063 .000 .000 2.10) MJU-76 (11) Prior Years Deliveries: 13500 7 2023 NAVY 15.898 15.898 .000 .000 7 2024 NAVY 37.001 37.001 .000 .000 8 2025 NAVY 24.880 24.880 .000 .000 8 2026 NAVY 19.535 19.535 .000 .000 8 2027 NAVY 36.965 36.965 .000 .000 2.12) MJU-78 (13) O C T N O V LI 0182 - Air Expendable Countermeasures Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 89 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C Aggregated Items: Air Expendable Countermeasures Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT (1) B A L A N C E Fiscal Year 2031 Calendar Year 2030 Calendar Year 2031 M F R # FY SERVICE PROC QTY 9 2024 NAVY 11.607 11.607 .000 .000 9 2025 NAVY 7.538 7.538 .000 .000 9 2026 NAVY 6.403 6.403 .000 .000 9 2027 NAVY 17.702 17.702 .000 .000 .000 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 5) F-35 COUNTERMEASURES 5.1) ALE-70 (22) Prior Years Deliveries: 2298 10 2023 NAVY .512 .512 .000 10 2023 AF (‡) .888 .888 .000 10 2023 Total 1.400 1.400 .000 10 2024 NAVY .480 .480 .000 10 2024 AF (‡) .440 .440 .000 10 2024 Total .920 .920 .000 10 2025 NAVY .160 .160 .000 10 2025 AF (‡) .352 .352 .000 10 2025 Total .512 .512 .000 10 2026 NAVY .160 .160 .000 10 2026 AF (‡) .324 .324 .000 10 2026 Total .484 .484 .000 - - - - 10 2027 NAVY .156 .096 .060 .012 .016 .016 .016 10 2027 AF (‡) .352 .240 .112 .028 .028 .028 .028 10 2027 Total .508 .336 .172 .040 .044 .044 .044 O C T N O V D E C J A N .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 LI 0182 - Air Expendable Countermeasures Navy - - - - - - - - - - - - - - - - - - - - .000 .000 .000 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 90 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0182 / Air Expendable Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Production Rates (Each / Year) MFR Ref # Aggregated Items: Air Expendable Countermeasures Procurement Leadtime (Months) Initial Manufacturer Name - Location (1) ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 BAE SYSTEMS - NASHUA, NH 30 120 300 3 9 16 25 0 9 16 25 2 Leonardo UK LTD - Luton, UK 2,000 10,000 15,000 5 3 8 11 0 3 8 11 3 Elbit Systems Ltd/CAAA Israel/Crane, IN 15,000 72,000 96,000 8 11 16 27 0 6 16 22 4 Crane Army Ammunition Activity - Crane, IN 15,000 46,080 120,960 0 5 24 29 0 0 0 0 2 11 12 23 0 6 12 18 6 Elbit Systems Ltd - Israel 8,000 30,000 45,000 8 11 16 27 0 6 16 22 7 BAE Systems - Nashua, NH 120 1,440 1,920 4 12 25 37 0 4 25 29 5 TBD - TBD TBD (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0182 - Air Expendable Countermeasures Navy UNCLASSIFIED Page 23 of 23 P-1 Line #7 Volume 1 - 91 === page 120 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 92 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Program Elements for Code B Items: N/A Other Related Program Elements: 0604258N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 118.360 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 118.360 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 118.360 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.407 6.177 8.179 0.000 8.179 9.218 12.609 14.587 - - - - - - - - 7.407 6.177 8.179 0.000 8.179 9.218 12.609 14.587 - - - - - - - - 7.407 6.177 8.179 0.000 8.179 9.218 12.609 14.587 To FY 2031 Complete 14.882 Continuing - Continuing - 14.882 Continuing - Total - Continuing - - 14.882 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Jet-Assisted Take-Off (JATO) / Rocket-Assisted Take-Off (RATO) are solid propellant rocket motors used to launch subsonic aerial targets into controlled flight. Subsonic aerial targets are used in Fleet Live Fire with a Purpose pre-deployment force generation certification events, Naval Sea Systems Command's post-availability Combat System Ship Qualification Test (CSSQT) program and developmental and operational test and evaluation in support of Navy and DoW acquisition programs. The JATO / RATO family of rocket motors consists of the MK-23 and MK-129 in support of BQM-34 launches, the MK-117 in support of BQM-74 launches, and the MK-85 in support of BQM-177 launches. MK-129 JATO Procurement includes required MK-296 Igniters. MK-129 is developed under PE 0604258N. JATO / RATO quantities are tied to BQM-177 and BQM-34 procurements, target operating activity inventories and annual target presentation requirements of the fleet for training and post-availability combat systems checks, Navy and DoW acquisition programs, and fleet exercise programs. Funding also supports production engineering support, integrated logistics support, ordnance safety, product improvements, quality assurance and lot acceptance testing. LI 0194 - Jet Assisted Take Off (JATOs) Navy UNCLASSIFIED Page 1 of 10 P-1 Line #8 Volume 1 - 93 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Program Elements for Code B Items: N/A Other Related Program Elements: 0604258N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 118.360 - / 7.407 - / 6.177 - / 8.179 - / 118.360 - / 7.407 - / 6.177 - / 8.179 - / - - / 8.179 / 0.000 - / 8.179 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding is required to support the procurement of MK-85 rocket motors in matched pairs to launch subsonic aerial targets. The quantities are based on current and projected expenditures, ready-for-issue Sub-Sonic Aerial Targets (SSAT) inventory, target operating site build capabilities, and maintaining inventory in accordance with OPNAV SSAT authorized allocation. FY 2027 funds the nonrecurring engineering associated with the production re-start of the MK-129 production line. FY 2027 also funds production support and other costs required in the production and acceptance of the MK-85 rocket motors. LI 0194 - Jet Assisted Take Off (JATOs) Navy UNCLASSIFIED Page 2 of 10 P-1 Line #8 Volume 1 - 94 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) JATO / RATO 1.1) MK-85 RATO A 1.2) MK-117 MOD 0 ROCKET MOTORS A 1.4) Non-Recurring A (1)(†) Engineering JATO (2) Subtotal: 1) JATO / RATO 12,983.96 3,118 40.484 3,137.41 16,600 52.081 - - - 15,492.50 400 6.197 - - - - - - - 92.565 - - - 7.785 - - 40,015.15 132 5.282 - - - - - - - 6.197 - - - 1.188 0.430 - - 36,000.00 120 4.320 - - - - - - - - - - - - 3.090 - - - 5.282 - - 7.410 - - - 0.872 - - 0.746 - - - - - - 36,000.00 120 4.320 - - - - - - 3.090 - - - - 7.410 - - - - - 0.746 - - - - - - - 2) Support 2.1) Production Support RATO A 2.2) Production Support JATO A 2.3) OTHER COSTS A - - 17.580 - - 0.022 - - 0.023 - - 0.023 - - - - - 0.023 Subtotal: 2) Support - - 25.795 - - 1.210 - - 0.895 - - 0.769 - - - - - 0.769 Total - - 118.360 - - 7.407 - - 6.177 - - 8.179 - - - - - 8.179 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) MK-85 RATO: Funding supports the procurement of MK-85 RATOs. Unit price increase in FY 2027 due to the requirement to produce new rocket motors. Prior rocket motors were produced using salvaged materials which are no longer available. (2) Non-recurring engineering required to qualify multiple parts for use on the restarted Mk-129 production line. Parts include, but are not limited to propellant, the initiator and the motor. NRE tasking required for Igniter and Motor. LI 0194 - Jet Assisted Take Off (JATOs) Navy UNCLASSIFIED Page 3 of 10 P-1 Line #8 Volume 1 - 95 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Method/Type or Funding Vehicle Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2022 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Dec 2021 Nov 2025 207 27,222.22 Y 2023 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Dec 2022 Jan 2026 460 12,394.66 Y 2024 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Dec 2023 Jan 2027 400 15,057.50 Y 2025 NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Dec 2024 Jan 2028 400 15,492.50 Y NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Mar 2026 Jan 2029 132 40,015.15 Y NSWC INDIAN HEAD DIV / Indian Head, MD PO NSWC Dec 2026 Jan 2030 120 36,000.00 Y (Each) RFP Issue Date 1) JATO / RATO (†) 1.1) MK-85 RATO (1)(†) 1.1) MK-85 RATO (1)(†) 1.1) MK-85 RATO (1)(†) 1.1) MK-85 RATO (1)(†) 1.1) MK-85 RATO (1)(†) 1.1) MK-85 RATO (1)(†) 2026 (3) 2027 indicates the presence of a P-21 Footnotes: (3) Contract award delay 3 month due to negotiations taking longer than expected due to administrative delays. LI 0194 - Jet Assisted Take Off (JATOs) Navy UNCLASSIFIED Page 4 of 10 P-1 Line #8 Volume 1 - 96 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) JATO / RATO 1.1) MK-85 RATO (1) Prior Years Deliveries: 2051 11 2022 NAVY 207 0 207 11 2023 NAVY 460 0 460 A - - - - - - - - - - - - - - - - - - - - - - 207 A - - - - - - - - - - 11 2024 NAVY 400 0 400 460 400 11 2025 NAVY 400 0 400 400 11 2026 NAVY 132 0 132 132 11 2027 NAVY 120 0 120 120 O C T LI 0194 - Jet Assisted Take Off (JATOs) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 97 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) JATO / RATO 1.1) MK-85 RATO (1) Prior Years Deliveries: 2051 11 2022 NAVY 207 0 207 - - - - - - - - - - - - - - - - - - - - - - - - 207 11 2023 NAVY 460 0 460 - - - - - - - - - - - - - - - - - - - - - - - - 460 11 2024 NAVY 400 0 400 A - - - - - - - - - - - - - - - - - - - - - - 400 11 2025 NAVY 400 0 400 A - - - - - - - - - - 400 11 2026 NAVY 132 0 132 11 2027 NAVY 120 0 120 132 120 O C T LI 0194 - Jet Assisted Take Off (JATOs) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 98 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) JATO / RATO 1.1) MK-85 RATO (1) Prior Years Deliveries: 2051 11 2022 NAVY 207 0 207 - 17 17 17 17 17 12 15 15 15 15 15 15 10 10 11 2023 NAVY 460 0 460 - - - 40 40 40 40 40 40 40 40 40 30 30 40 11 2024 NAVY 400 0 400 - - - - - - - - - - - - - - - 33 33 33 33 33 33 33 33 34 102 11 2025 NAVY 400 0 400 - - - - - - - - - - - - - - - - - - - - - - - - 400 11 2026 NAVY 132 0 132 A - - - - - - - - - - - - - - - - - - - 132 11 2027 NAVY 120 0 120 A - - - - - - - - - - 120 O C T LI 0194 - Jet Assisted Take Off (JATOs) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C 0 0 J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 99 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) JATO / RATO 1.1) MK-85 RATO (1) Prior Years Deliveries: 2051 11 2022 NAVY 207 207 0 11 2023 NAVY 460 460 0 0 11 2024 NAVY 400 298 102 34 34 34 11 2025 NAVY 400 0 400 - - - 34 34 34 34 33 33 33 33 33 33 33 33 11 2026 NAVY 132 0 132 - - - - - - - - - - - - - - - 11 2027 NAVY 120 0 120 0 O C T LI 0194 - Jet Assisted Take Off (JATOs) Navy N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V 0 11 D E C 11 J A N 11 F E B P-1 Line #8 11 M A R 11 A P R 11 M A Y 11 J U N 11 J U L A U G 11 33 - 120 S E P Volume 1 - 100 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) JATO / RATO 1.1) MK-85 RATO (1) Prior Years Deliveries: 2051 11 2022 NAVY 207 207 0 0 11 2023 NAVY 460 460 0 0 11 2024 NAVY 400 400 0 0 11 2025 NAVY 400 400 0 11 2026 NAVY 132 99 33 11 11 11 11 2027 NAVY 120 0 120 - - - 0 O C T LI 0194 - Jet Assisted Take Off (JATOs) Navy N O V D E C 0 10 J A N 10 F E B 10 M A R 10 A P R 10 M A Y 10 J U N 10 J U L 10 A U G UNCLASSIFIED Page 9 of 10 10 S E P 10 O C T 10 N O V 10 D E C 0 J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 101 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0194 / Jet Assisted Take Off (JATOs) Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Aggregated Items: Jet Assisted Take Off (JATOs)/Rocket Assisted Take Off (RATOs) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NSWC INDIAN HEAD DIV Indian Head, MD MSR For 2027 1-8-5 For 2027 MAX For 2027 100 500 6,000 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 3 18 Total After Oct 1 ALT Prior to Oct 1 21 ALT After Oct 1 0 Manufacturing PLT 3 Total After Oct 1 37 40 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0194 - Jet Assisted Take Off (JATOs) Navy UNCLASSIFIED Page 10 of 10 P-1 Line #8 Volume 1 - 102 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 527.835 527.835 527.835 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 21.051 24.864 44.136 0.000 44.136 36.373 38.959 32.256 - - - - - - - - 21.051 24.864 44.136 0.000 44.136 36.373 38.959 32.256 - - - - - - - - 21.051 24.864 44.136 0.000 44.136 36.373 38.959 32.256 To FY 2031 Complete 32.902 Continuing - Continuing - 32.902 Continuing - Total - Continuing - - 32.902 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Program procures conventional 5"/54 ammunition and Counter Unmanned Aerial Systems (C-UAS) Hypervelocity Projectile (HVP) rounds supporting CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). Both ammunition are fired from MK 45 gun installed on Cruiser and Destroyer combatant ships against air, surface, and shore targets. Conventional 5"/54 Ammunition items procured includes propelling charges, high-explosive projectiles, fuzes, and training rounds. In FY 2024 the USN 5"/54 ammunition production was line was shut down due to the production facility eliminating their 5"/54 ammunition production capability in support of the Ukraine requirement for 155mm ammunition. As a result, the USN 5"/54 ammunition inventory is critically low and will worsen if action is not taken immediately. LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 1 of 15 P-1 Line #9 Volume 1 - 103 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / 5 Inch/54 Gun Ammunition P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 527.835 - / 21.051 - / 24.864 - / 44.136 - / 0.000 - / 44.136 - / 527.835 - / 21.051 - / 24.864 - / 44.136 - / 0.000 - / 44.136 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Baseline program funds procurement of Propelling Charges and Training Projectiles to maintain operational requirements. It also funds Product Improvement Program to continue addressing source of supply and ammunition obsolescence issues, as well as Renovation Program to restore legacy assets to fleet issuable condition. Baseline program also funds Production Engineering and Gauge requirements for all 5"/54 ammunition. FY2027 funding is to restore 5"/54 ammunition production capability and to convert unserviceable rounds to training rounds to reduce the gap between current inventory levels and the USN ammunition requirements for training and operational purposes. Operational purposes include surface warfare, air warfare, CUAS and shore engagements. 5"/54 ammunition types are inert training rounds, high explosive and kinetic energy rounds, and high velocity projectiles. Baseline program also funds production engineering and gauge requirements for all 5"/54 ammunition. The FY2027 funding will be used to address the inventory issue near term by refurbishing unserviceable rounds into inert training rounds, and long term by starting the reestablishment of supplier production capability of all types of rounds using the treated cast iron process (Austempered Ductile Iron ADI). ADI will create a stronger projectile casting with superior strength. LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 2 of 15 P-1 Line #9 Volume 1 - 104 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 21.051 24.864 44.136 0.000 44.136 - Gross/Weapon System Cost ($ in Millions) 527.835 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 527.835 Plus CY Advance Procurement ($ in Millions) - - - - - 21.051 24.864 44.136 0.000 44.136 - Total Obligation Authority ($ in Millions) 527.835 FY 2027 Total - - - - - 21.051 24.864 44.136 0.000 44.136 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - AC100 5"/54 AMMUNITION HARDWARE Cost Recurring Cost 1.1.1) 5"54 CHG, PROP, CLEARING, MK65 (D296) 1,087.58 491 0.534 - - - - - - - - - - - - - - - 1.1.2) 5"/54 CHG, PROP, FULL (D326) 909.40 74,327 67.593 - - - - - - - - - - - - - - - 1,393.23 34,873 48.586 - - - - - - 2,433.78 7,061 17.185 - - - 2,433.78 7,061 17.185 482.63 57,765 27.879 - - - - - - 1,450.00 9,540 13.833 - - - 1,450.00 9,540 13.833 1.1.5) 5"/54 PROJ, MULTI OPTION FUZE (DA48) 1,941.27 28,944 56.188 - - - - - - - - - - - - - - - 1.1.6) MK187 MOD 0 PROJECTILE (DA53) 3,486.24 1.1.3) 5"/54 CHG, PROP, FULL (†) (1) (DA65) 1.1.4) 5"54 PROJ, (†) (2) BLP/T (D349) 14,902 51.952 - - - - - - - - - - - - - - - 1.1.7) MK14 Tank - - 2.040 - - - - - - - - - - - - - - - 1.1.8) TRANSPORTATION - - 4.512 - - 0.225 - - 0.400 - - 0.500 - - - - - 0.500 1.1.9) PE/QA SMCA - - 1.559 - - - - - - - - - - - - - - - 1.1.10) PRIOR YEARS CUMULATIVE FUNDING - - 25.388 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 286.231 - - 0.225 - - 0.400 - - 31.518 - - - - - 31.518 ACCT CODE (3) LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 3 of 15 P-1 Line #9 Volume 1 - 105 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware AC100 5"/54 AMMUNITION HARDWARE Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - 286.231 - - 0.225 - - 0.400 - - 31.518 - - - - - 31.518 Hardware - AC850 PRODUCT IMPROVEMENT Cost Recurring Cost 2.1.1) PRODUCT IMPROVEMENT - - 37.496 - - - - - - - - - - - - - - - 2.1.2) PROJECTILE MATERIAL IMPLEMENTATION PRODUCT IMPROVEMENT - - - - - 6.000 - - 7.400 - - 3.806 - - - - - 3.806 2.1.3) PROJECTILE BALLISTIC & ENVIRONMENTAL TESTING PRODUCT IMPROVEMENT - - - - - 1.900 - - 1.350 - - 0.600 - - - - - 0.600 2.1.4) PROJECTILE ENGINEERING & SAFETY PRODUCT IMPROVEMENT - - - - - 0.750 - - 0.345 - - 0.275 - - - - - 0.275 2.1.5) PROPELLING CHARGE MATERIAL IMPLEMENTATION PRODUCT IMPROVEMENT - - - - - 4.450 - - 3.350 - - - - - - - - - 2.1.6) PROPELLING CHARGE BALLISTIC & ENVIRONMENTAL TESTING PRODUCT IMPROVEMENT - - - - - 1.800 - - 0.950 - - - - - - - - - 2.1.7) PROPELLING CHARGE ENGINEERING & SAFETY PRODUCT IMPROVEMENT - - - - - 0.578 - - 0.254 - - - - - - - - - Subtotal: Recurring Cost - - 37.496 - - 15.478 - - 13.649 - - 4.681 - - - - - 4.681 Subtotal: Hardware - AC850 PRODUCT IMPROVEMENT Cost - - 37.496 - - 15.478 - - 13.649 - - 4.681 - - - - - 4.681 108.664 - - - - - - - - - - - - - - - Hardware - AC893 RENOVATION COMPONENTS Cost Recurring Cost 3.1.1) RENOVATION COMPONENTS - - LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 4 of 15 P-1 Line #9 Volume 1 - 106 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.2) PROJECTILE Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) (4) - - - - - - 583.35 6,428 3.750 600.00 6,250 3.750 - - - 600.00 6,250 3.750 3.1.3) PROPELLING CHARGE - - - - - - 130.00 23,000 2.990 - - - - - - - - - - - 108.664 - - - - - 6.740 - - 3.750 - - - - - 3.750 - - 108.664 - - - - - 6.740 - - 3.750 - - - - - 3.750 RENOVATION RENOVATION (†) Subtotal: Recurring Cost Subtotal: Hardware AC893 RENOVATION COMPONENTS Cost Hardware - AC894 GAUGE REQUIREMENTS Cost Recurring Cost 4.1.1) GAUGE REQUIREMENTS - - 5.624 - - 0.377 - - 0.380 - - 0.380 - - - - - 0.380 Subtotal: Recurring Cost - - 5.624 - - 0.377 - - 0.380 - - 0.380 - - - - - 0.380 Subtotal: Hardware - AC894 GAUGE REQUIREMENTS Cost - - 5.624 - - 0.377 - - 0.380 - - 0.380 - - - - - 0.380 Hardware - (AC895) NON-STANDARD Cost Non Recurring Cost 5.1.1) NONSTANDARD - - 2.286 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 2.286 - - - - - - - - - - - - - - - Subtotal: Hardware (AC895) NON-STANDARD Cost - - 2.286 - - - - - - - - - - - - - - - - - 16.876 - - - - - - - - - - - - - - - - - 0.945 - - - - - - - - - - - - - - - - - 2.585 - - - - - - - - - - - - - - - - - 4.294 - - - - - - - - - - - - - - - - - 24.700 - - - - - - - - - - - - - - - Hardware - AC900 CENTCOM CUAS Cost Non Recurring Cost 6.1.1) HVP ROUNDS (5) 6.1.2) HVP WARHEADS (6) 6.1.3) HVP PROJECTILE DATA LINK (PDLs) (7) 6.1.4) HVP INTEGRATION (8) Subtotal: Non Recurring Cost LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 5 of 15 P-1 Line #9 Volume 1 - 107 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - AC900 CENTCOM CUAS Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($) - 24.700 - - - - - - - - - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - 957 1.061 - - - - - - - - - - - - - - 1.061 - - - - - - - - - - - - - - - 1.061 - - - - - - - - - - - - Hardware - AC90079 - Israel Supplemental Cost Non Recurring Cost 7.1.1) MK 419 MOD 1 Multi-Function Fuze (†) (MFF) Subtotal: Non Recurring Cost Subtotal: Hardware - AC90079 - Israel Supplemental Cost 1,109.00 Support - AC830 PRODUCTION ENGINEERING Cost 8.1) PRODUCTION ENGINEERING - - 55.650 - - 3.910 - - 3.695 - - 3.807 - - - - - 3.807 8.2) QCCCF PE Support - - 7.184 - - - - - - - - - - - - - - - Subtotal: Support AC830 PRODUCTION ENGINEERING Cost - - 62.834 - - 3.910 - - 3.695 - - 3.807 - - - - - 3.807 Gross/Weapon System Cost - - 527.835 - - 21.051 - - 24.864 - - 44.136 - - 0.000 - - 44.136 Remarks: [Hardware] AC100: 5"54 Ammunition Hardware includes costs to procure components, load and assembly of complete rounds, and acceptance tests. Costs associated with Transportation Account Code (TAC) are for first destination of delivery of production items. Unit costs and quantities are adjusted during year of execution. [Hardware] AC850: Product Improvement engineering services and related efforts by government activities, the producing contractor or manufacturing installation, are executed to extend the useful military life of an item or to improve the item/address component obsolescence within the current performance envelope. Product Improvement engineering services are required to execute the reestablishment of the 5"/54 ammo production line. [Hardware] AC893: Renovation includes costs to procure upgraded components necessary to maximize fleet's tactical capabilities and restoration of unserviceable assets to issuable condition. [Hardware] AC894: Gauge Requirements are for the procurement of gauges, auxiliary and test equipment and support costs necessary for ammunition metrology to check critical dimensions/parameters of ammunition items and their parts. [Hardware] AC900: Newly established C-UAS Hypervelocity Projectile (HVP) cost elements in support of FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). [Hardware] AC90079: Supplemental funds provided in support of FY2025 Israel Security Supplemental Tranche 8, Appropriations Act, 2024 (Division A of Public Law 118-50). LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 6 of 15 P-1 Line #9 Volume 1 - 108 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition MDAP/MAIS Code: [Support Cost] AC830: Production engineering for engineering services to support new acquisition, in production ammunition, and the reestablishment of the 5"/54 ammo production line. (†) indicates the presence of a P-5a Footnotes: (1) AC100: FY2027 DA65 1.1.3: FY2027 funding will resume procurement of rounds by implementing work completed by recent product improvement qualifications to re-establish the industrial base for qualified cartridge case sources of supply. (2) AC100: FY2027 D349 1.1.4: FY2027 funding increase to resume procurement of rounds through initial Low Rate Initial Production (LRIP) buy, utilizing one of the new qualified sources of supply for projectile bodies. Full Rate Procurement (FRP) to resume in FY2028, following completion of LRIP qualifications and inventory renovations in 2027. FY2027 funding is still being utilized to finalize Product Improvement qualifications for Cast Austempered Ductile Iron (ADI) projectiles (AC850, CE 2.1.2, 2.1.3, 2.1.4) and Renovation efforts (AC893, CE 3.1.2) to expedite Fleet inventory replenishment. This cost-effective Renovation approach leverages existing components and unserviceable assets, ensuring continued Fleet training capability. (3) AC100 FY 2027 Transportation Account Code (TAC) 1.1.8: FY2027 funding increase supports critical shipping requirements driven by expanded international deliveries and new qualified sources, renovation logistics, and expedited Fleet asset positioning to address current inventory shortages. (4) AC893: FY2026 and FY2027 3.1.2 (Projectile Renovation) Established to renovate unserviceable assets to newly serviceable assets (QTY 6,428 and 6,250) to the fleet. Efforts include removing the unserviceable asset from its current packaging, safely removing and disposing of the nose fuze and current explosive fill, certifying the components structural integrity, and renovating the exterior and rotating band back to serviceable condition. This effort is necessary to address critical inventory posture. (5) AC900: 6.1.1 HVP Rounds: Counter Unmanned Aerial Systems (C-UAS) Hypervelocity Projectile (HVP) Round cost element to procure twenty-two (22) HVP rounds in support of FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). (6) AC900: 6.1.2 HVP Warheads: Counter Unmanned Aerial Systems (C-UAS) Hypervelocity Projectile (HVP) Warheads cost element to procure twenty-two (22) HVP warheads in support of FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). (7) AC900: 6.1.3 HVP Projectile Data Link: Counter Unmanned Aerial Systems (C-UAS) Hypervelocity Projectile (HVP) Projectile Data Link (PDL) cost element to procure twenty-two (22) HVP Projectile Data Links in support of FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). (8) AC900: 6.1.4 HVP Integration: Counter Unmanned Aerial Systems (C-UAS) Hypervelocity Projectile (HVP) integration cost element for HVP integration efforts in support of FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101). LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 7 of 15 P-1 Line #9 Volume 1 - 109 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 O O C Cost Elements 1.1.3) 5"/54 CHG, PROP, FULL (†) (DA65) 1.1.3) 5"/54 CHG, PROP, FULL 1.1.3) 5"/54 CHG, PROP, FULL 1.1.3) 5"/54 CHG, PROP, FULL 1.1.4) 5"54 PROJ, BLP/T (D349) (†) 1.1.4) 5"54 PROJ, BLP/T (D349) (†) 3.1.2) PROJECTILE RENOVATION (†) 3.1.2) PROJECTILE RENOVATION (†) 3.1.3) PROPELLING CHARGE RENOVATION (†) 7.1.1) MK 419 MOD 1 MultiFunction Fuze (MFF) (†) Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 2020 GDOTS/CCC / VALLEYFIELD, CANADA C / FFP NSWC IH Nov 2019 Oct 2024 4,131 1,556.69 Y Jun 2018 (9) GDOTS/CCC / VALLEYFIELD, CANADA C / FFP NSWC IH Apr 2021 Sep 2026 5,551 2,161.12 Y Jun 2018 (10) GDOTS/CCC / VALLEYFIELD, CANADA C / FFP NSWC IH Oct 2021 Sep 2026 5,106 1,401.25 Y Jun 2018 TBD / TBD C / FFP NSWC IHD Jun 2027 Jun 2031 7,061 2,433.78 Y Nov 2026 NGDS / ROCKET CENTER, WV C / FFP NSWC IHD Mar 2020 Sep 2026 5,828 878.42 Y Feb 2019 2027 TBD / TBD C / FFP NSWC IHD May 2027 Sep 2029 9,540 1,450.00 Y May 2027 2026 Crane Army Ammunition Activity / NSWC CRANE, IND PO TBD Apr 2026 Dec 2026 6,428 583.35 Y Oct 2025 2027 Crane Army Ammunition Activity / NSWC CRANE, IND PO TBD Apr 2027 Dec 2027 6,250 600.00 Y Oct 2026 2026 McAlester Army Ammunition Plant / McAlester, OK PO TBD May 2026 Oct 2026 23,000 130.00 Y Oct 2025 2025 NGDS / ROCKET CENTER, WV C / FFP NSWC IHD Mar 2026 Sep 2027 957 1,109.00 Y Oct 2025 2027 (†) (DA65) Location of PCO Award Date Contractor and Location 2022 (†) (DA65) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition FY 2021 (†) (DA65) P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition 2020 (11) (Each) indicates the presence of a P-21 Footnotes: (9) Delivery dates have shifted to Sept 2026 for receipt of oustanding materials. (10) (11) Delivery dates have shifted to Sept 2026 for receipt of oustanding materials. Delivery dates are delayed due to the removal of the Navy 5 inch Production line as part of the 155mm Artillery Expansion at Scranton. Navy is working with the Prime Contractor to bring Austempered Cast Ductile Iron (ADI) up to production readiness as the material replacement for product previously manufactured at Scranton. Quantities may be adjusted depending on the outcome. LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 8 of 15 P-1 Line #9 Volume 1 - 110 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 .000 4.131 1 2021 NAVY 5.551 .000 5.551 1 2022 NAVY 5.106 .000 5.106 5.106 2 2027 NAVY 7.061 .000 7.061 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) A - - - - - - - - - - - - - - - - - - - - - - - 4.131 A - - - - - - 5.551 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 .000 5.828 4 2027 NAVY 9.540 .000 9.540 9.540 3.1.2) PROJECTILE RENOVATION A - - - - - - - - - - - - - - - - - - - 5.828 (4) 5 2026 NAVY 6.428 .000 6.428 6.428 5 2027 NAVY 6.250 .000 6.250 6.250 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 .000 23.000 23.000 O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 111 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 .000 4.131 - - - - - - - - - - - - - - - - - - - - - - - - 4.131 1 2021 NAVY 5.551 .000 5.551 - - - - - - - - - - - - - - - - - - - - - - - - 5.551 1 2022 NAVY 5.106 .000 5.106 A - - - - - - - - - - - - - - - - - - - - - - - - 5.106 2 2027 NAVY 7.061 .000 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) 7.061 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 .000 5.828 4 2027 NAVY 9.540 .000 9.540 9.540 3.1.2) PROJECTILE RENOVATION - - - - - - - - - - - - - - - - - - - - - - - - 5.828 (4) 5 2026 NAVY 6.428 .000 6.428 6.428 5 2027 NAVY 6.250 .000 6.250 6.250 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 .000 23.000 23.000 O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 112 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 .000 4.131 - - - - - - - - - - - - .927 - - - - - - - - - - - 3.204 1 2021 NAVY 5.551 .000 5.551 - - - - - - - - - - - - - - - - - - - - - - - - 5.551 1 2022 NAVY 5.106 .000 5.106 - - - - - - - - - - - - - - - - - - - - - - - - 5.106 2 2027 NAVY 7.061 .000 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) 7.061 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 .000 5.828 4 2027 NAVY 9.540 .000 9.540 9.540 3.1.2) PROJECTILE RENOVATION - - - - - - - - - - - - - - - - - - - - - - - - 5.828 (4) 5 2026 NAVY 6.428 .000 6.428 6.428 5 2027 NAVY 6.250 .000 6.250 6.250 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 .000 23.000 23.000 O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 113 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 .927 3.204 - - - - - - - - - - - 3.204 .000 1 2021 NAVY 5.551 .000 5.551 - - - - - - - - - - - 5.551 .000 1 2022 NAVY 5.106 .000 5.106 - - - - - - - - - - - 5.106 2 2027 NAVY 7.061 .000 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) .000 A - - - - 7.061 A - - - - - 9.540 - - 1.428 A - - - - - - 6.250 - 5.000 - 3.000 .000 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 .000 5.828 4 2027 NAVY 9.540 .000 9.540 3.1.2) PROJECTILE RENOVATION - - - - - - - - - - - 3.000 2.828 .000 (4) 5 2026 NAVY 6.428 .000 6.428 5 2027 NAVY 6.250 .000 6.250 A - - - - - - - - 2.500 - - 2.500 .000 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 .000 23.000 A O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P 5.000 O C T N O V D E C 5.000 J A N F E B P-1 Line #9 M A R 5.000 A P R M A Y J U N J U L A U G S E P Volume 1 - 114 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 4.131 .000 .000 1 2021 NAVY 5.551 5.551 .000 .000 1 2022 NAVY 5.106 5.106 .000 2 2027 NAVY 7.061 .000 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) .000 - - - - - - - - - - - - - - - - - - - - - - - - 7.061 - - - - - - - - - - - - - - - - - - - - - - - 3.000 6.540 - - 2.500 - - 2.500 - - 1.250 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 5.828 .000 4 2027 NAVY 9.540 .000 9.540 3.1.2) PROJECTILE RENOVATION .000 (4) 5 2026 NAVY 6.428 6.428 .000 5 2027 NAVY 6.250 .000 6.250 .000 .000 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 23.000 .000 .000 O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 115 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition 1.1.3) 5"/54 CHG, PROP, FULL (DA65) Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 20085 1 2020 NAVY 4.131 4.131 .000 .000 1 2021 NAVY 5.551 5.551 .000 .000 1 2022 NAVY 5.106 5.106 .000 2 2027 NAVY 7.061 .000 7.061 1.1.4) 5"54 PROJ, BLP/T (D349) .000 - - - 3.000 3.000 .540 - - - - - - - - - - - - - - - - - 7.061 .000 (2) Prior Years Deliveries: 51937 3 2020 NAVY 5.828 5.828 .000 4 2027 NAVY 9.540 3.000 6.540 3.1.2) PROJECTILE RENOVATION .000 .000 (4) 5 2026 NAVY 6.428 6.428 .000 .000 5 2027 NAVY 6.250 6.250 .000 .000 3.1.3) PROPELLING CHARGE RENOVATION 6 2026 NAVY 23.000 23.000 .000 .000 O C T LI 0250 - 5 Inch/54 Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 116 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0250 / 5 Inch/54 Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / 5 Inch/54 Gun Ammunition Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GDOTS/CCC VALLEYFIELD, CANADA 5,000 60,000 120,000 6 6 23 29 6 6 5 11 2 TBD - TBD 5,000 60,000 120,000 6 6 48 54 6 6 12 18 3 NGDS - ROCKET CENTER, WV 3,000 36,000 60,000 6 6 24 30 6 6 21 27 0 0 27 27 0 0 0 0 6 6 12 18 6 6 5 11 6 6 5 11 6 6 11 17 4 TBD - TBD TBD 5 Crane Army Ammunition Activity - NSWC CRANE, IND TBD 6 McAlester Army Ammunition Plant - McAlester, OK TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0250 - 5 Inch/54 Gun Ammunition Navy UNCLASSIFIED Page 15 of 15 P-1 Line #9 Volume 1 - 117 === page 146 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 118 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 387.046 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 387.046 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 387.046 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 34.177 38.661 40.095 0.000 40.095 41.568 42.374 43.255 44.117 - - - - - - - - - - - 34.177 38.661 40.095 0.000 40.095 41.568 42.374 43.255 44.117 - - - - - - - - - - - 34.177 38.661 40.095 0.000 40.095 41.568 42.374 43.255 44.117 - Total 671.293 671.293 671.293 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Program provides for intermediate caliber family of fixed ammunition for United States Navy and United States Coast Guard (USCG) use. The Navy's primary use for intermediate caliber ammunition is to engage both surface and air targets. USCG primary use is for drug interdiction, homeland defense, and Visit, Board, Search and Seize (VBSS). Intermediate caliber ammunition is currently employed on the Littoral Combat Ship (LCS), and the USCG National Security Cutter. It will be used on the USN Constellation-class Frigate and the USCG Offshore Patrol Cutter. LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 1 of 13 P-1 Line #10 Volume 1 - 119 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Intermediate Caliber Gun Ammo P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 387.046 - / 34.177 - / 38.661 - / 40.095 - / 387.046 - / 34.177 - / 38.661 - / 40.095 - / - - / 40.095 / 0.000 - / 40.095 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 57mm ammunition supports the MK 110 Gun Mount providing essential Anti-Air Warfare, Anti-Surface Warfare, and Fast Attack Craft/Fast In-Shore Attack Craft (FAC/FIAC) defense capabilities for USN LCS and USCG National Security Cutter platforms. The program also supports future integration onto the USN Constellation-class Frigate and USCG Offshore Patrol Cutter (OPC) platforms. Program resources support new inventory procurement, acceptance testing, production engineering support, ammunition inspection gauge requirements, and product improvement for existing 57MM cartridges. LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 2 of 13 P-1 Line #10 Volume 1 - 120 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Unit Cost ($) Code 1) AL100 TRANSPORTATION ACCOUNT CODE 1.1) TRANSPORTATION ACCOUNT CODE A Subtotal: 1) AL100 TRANSPORTATION ACCOUNT CODE Qty (Each) FY 2025 Total Cost ($ M) A 2.2) CART., 57MM DUMMY, MK307 A 2.4) CART., 57MM TP (BA23) A 2.5) ALaMO MK332 A (†) 2.6) CART., 57MM, HE-PD MK334 (†) 2.8) CART., 57MM, HE-PD MK338 (BA64) 4.1) PRODUCT IMPROVEMENT ($ M) ($) (Each) ($ M) - - - - 0.834 - - 0.059 - - 0.060 - - 0.062 - - - - - 0.062 0.834 - - 0.059 - - 0.060 - - 0.062 - - - - - 0.062 - - - - - - - - - (2) 800 1.841 - - - - - - 2,760.20 1,000 2.760 - - - 2,760.20 1,000 2.760 4,715.68 16,647 78.502 3,458 22.360 4,550 29.421 6,595.00 3,315 21.862 - - - 6,595.00 3,315 21.862 1,377.49 55,869 76.959 - - - - - - - - - - - - - - - 29,457.40 2,359 69.490 - - - - - - - - - - - - - - - 2,030.15 10,349 21.010 - - - - - - - - - - - - - - - 800.30 42,499 34.012 946.99 1,830 1.733 872.72 5,008 4.371 890.08 5,258 4.680 - - - 890.08 5,258 4.680 2,183.23 16,378 35.757 2,267.37 2,332 5.288 - - - 2,336.00 2,582 6.032 - - - 2,336.00 2,582 6.032 - - 317.944 - - 29.381 - - 33.792 - - 35.334 - - - - - 35.334 - - 35.465 - - 4.095 - - 4.135 - - 4.011 - - - - - 4.011 - - 35.465 - - 4.095 - - 4.135 - - 4.011 - - - - - 4.011 - - 31.348 - - 0.520 - - 0.530 - - 0.541 - - - - - 0.541 - - 31.348 - - 0.520 - - 0.530 - - 0.541 - - - - - 0.541 6,466.13 6,466.13 (5) (6) A Subtotal: 4) AL850 PRODUCT IMPROVEMENT 5) AL894 GAUGE REQUIREMENTS (Each) 2,301.25 Subtotal: 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 4) AL850 PRODUCT IMPROVEMENT ($) Total Cost - A Subtotal: 3) AL830 PRODUCTION ENGINEERING ($ M) Qty - A A (Each) Unit Cost - (4)(†) 3.1) PRODUCTION ENGINEERING ($) Qty - A 3) AL830 PRODUCTION ENGINEERING ($ M) Unit Cost - (BA60) MK337 (BA63) (Each) Qty - (†) 2.7) CART., 57MM TP ($) Unit Cost 0.373 (3)(†) (BA59) ($ M) Qty FY 2027 Total Total Cost 844 (BA31) A (Each) Unit Cost FY 2027 OOC Total Cost 441.94 (†) 2.3) CART., 57MM, 3P MK295 (BA22) ($) Qty FY 2027 Base Total Cost (1) 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.1) CART., 57MM DUMMY, RAMMABLE (BA50) Unit Cost FY 2026 Total Cost Aggregated Items Title: Intermediate Caliber Gun Ammo (7) LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 3 of 13 P-1 Line #10 Volume 1 - 121 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.1) GAUGE REQUIREMENTS A MAIS Code Unit Cost ($) Qty (Each) - - Subtotal: 5) AL894 GAUGE REQUIREMENTS - Total - FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) 1.455 - - - 1.455 - - 387.046 - FY 2026 Total Cost ($ M) ($) Qty (Each) 0.122 - - - 0.122 - - 34.177 - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Unit Cost Aggregated Items Title: Intermediate Caliber Gun Ammo FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) 0.144 - - - 0.144 - - 38.661 - FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 0.147 - - - - - 0.147 - 0.147 - - - - - 0.147 - 40.095 - - - - - 40.095 indicates the presence of a P-5a Footnotes: (1) (2) AL100: Transportation Account Code (TAC) costs are for first destination of delivery of production items. Program provides for complete rounds and conducts acceptance testing of intermediate caliber ammunition. Procurement includes fuzed high explosive service ammunition and practice ammunition. Procurement also includes inert dummy ammunition for fleet training. Unit costs and quantities are adjusted during year of execution to include contract fees and test costs. (3) Item Number 2.3) CART., 57MM, 3P MK295 (BA22) procurement is prioritized in FY2025, FY2026, and FY2027 to ensure continued availability of proximity-fuzed 57mm ammunition. This action strategically addresses inventory needs, optimizing the use of existing, proven technology to provide effectiveness against a variety of surface and aerial targets. This effort ensures uninterrupted operational readiness with proximity-fuzed ammunition. (4) (5) (6) (7) 2.8) FY2025 funding is allocated to 2.8) CART., 57MM, HE-PD MK338 (BA64) to align with a Foreign Military Sales order. AL830: Provides production engineering services related to maintaining technical data, procuring ammunition, and testing ammunition for Government acceptance. AL850: Product Improvement program funding will be used to address component obsolescence for 57mm ammunition. AL894: Gauge Requirements provide for procurement of gauges, auxiliary and test equipment and support costs necessary for ammunition metrology to check critical dimensions/parameters of ammunition items and their parts. This is to assure proper mating of parts and subassemblies, assure correct interfacing between the ammunition and guns, and proper ammunition performance. LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 4 of 13 P-1 Line #10 Volume 1 - 122 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Intermediate Caliber Gun Ammo Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.2) CART., 57MM DUMMY, MK307 (BA31) 2022 BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC-IH Sep 2023 Mar 2026 800 1,964.78 Y May 2023 2.2) CART., 57MM DUMMY, MK307 (BA31) 2027 BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC IH Mar 2027 Mar 2030 1,000 2,760.20 Y Aug 2026 2.3) CART., 57MM, 3P MK295 (BA22) (3)(†) 2.3) CART., 57MM, 3P MK295 (BA22) (3)(†) 2.3) CART., 57MM, 3P MK295 (BA22) (3)(†) 2.3) CART., 57MM, 3P MK295 (BA22) (3)(†) 2024 (8) BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC IH Apr 2026 Apr 2029 190 6,446.13 Y Apr 2025 2025 (9) BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC IH Apr 2026 Apr 2029 3,458 6,466.13 Y Apr 2025 (10) BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC IH Apr 2026 Apr 2029 4,550 6,466.13 Y Apr 2025 2027 BAE SYSTEMS INC / MINNESOTA SS / FFP NSWC IH Mar 2027 Mar 2030 3,315 6,595.00 Y Apr 2025 2026 2.5) ALaMO MK332 (BA59) (†) 2020 L-3 HARRIS / PLANO, TX SS / FFP NAVSEA Apr 2020 Dec 2024 658 25,599.99 Y May 2018 2.5) ALaMO MK332 (BA59) (†) 2021 L-3 HARRIS / PLANO, TX SS / FFP NAVSEA Aug 2021 Mar 2025 867 29,306.80 Y May 2018 2.6) CART., 57MM, HE-PD MK334 (BA60) (†) 2.6) CART., 57MM, HE-PD MK334 (BA60) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.7) CART., 57MM TP MK337 (BA63) (†) 2.8) CART., 57MM, HE-PD MK338 (BA64) (4)(†) 2.8) CART., 57MM, HE-PD MK338 (BA64) (4)(†) 2018 (11) NAMMO PERRY INC / PERRY, FL C / FFP NSWC-IH Jan 2019 May 2026 1,370 1,500.00 Y Sep 2018 2019 (12) NAMMO PERRY INC / PERRY, FL C / FFP NSWC-IH Jan 2019 May 2026 4,679 1,734.45 Y Sep 2018 2022 (13) GDOTS CANADA / CANADA C / FFP NSWC- IH Jan 2022 Jan 2026 24,254 739.61 Y Apr 2020 2023 (14) GDOTS CANADA / CANADA C / FFP NSWC- IH Jun 2023 Sep 2026 6,000 794.83 Y Apr 2020 2024 (15) GDOTS CANADA / CANADA C / FFP NSWC-IH Sep 2024 Nov 2026 4,401 900.67 Y Apr 2020 2025 GDOTS CANADA / CANADA C / FFP NSWC- IH Oct 2024 May 2027 1,830 946.99 Y Apr 2020 2026 TBD / TBD C / FFP NSWC IH Apr 2026 Jul 2028 5,008 872.72 Y Oct 2025 2027 TBD / TBD C / FFP NSWC IH Mar 2027 Mar 2029 5,258 890.08 Y Oct 2025 2023 (16) NAMMO PERRY INC. / PERRY, FL C / FFP NSWC-IH Sep 2023 Jun 2026 7,496 2,380.66 Y Apr 2023 2024 (17) NAMMO PERRY INC. / PERRY, FL C / FFP NSWC-IH Nov 2023 Nov 2026 8,882 2,016.65 Y Apr 2023 LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 5 of 13 P-1 Line #10 Volume 1 - 123 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] 2.8) CART., 57MM, HE-PD MK338 (BA64) (4)(†) 2.8) CART., 57MM, HE-PD MK338 (BA64) (†) (4)(†) O O C P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Aggregated Items: Intermediate Caliber Gun Ammo FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2025 NAMMO PERRY INC. / PERRY, FL C / FFP NSWC IH Sep 2025 Apr 2027 2,332 2,267.37 Y Apr 2023 2027 TBD / TBD C / FFP NSWC IH Mar 2027 Mar 2029 2,582 2,336.00 Y Nov 2026 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Footnotes: (8) (9) FY2024 will award with FY2026 order. Contract award shifted from September 2025 to April 2026 due to delays receiving the cost proposal submission. FY2025 will award with FY2026 order. Contract award shifted from September 2025 to April 2026 due to delays receiving the cost proposal submission. (10) (11) (12) (13) (14) (15) (16) (17) New award of multiple year contract for Item 2.3) CART., 57MM, 3P MK295 (BA22). Contract award shifted from December 2025 to April 2026 due to delays receiving the cost proposal submission. Delivery schedule revised to accommodate the implementation of a corrective action plan addressing a critical defect. Delivery schedule revised to accommodate the implementation of a corrective action plan addressing a critical defect. Delivery schedule reflects contractor analysis to determine and correct the root cause of variance in primer performance. Award schedule synchronized with Foreign Military Sales requirements to achieve favorable unit cost. Delivery schedule reflects contractor analysis to determine and correct the root cause of variance in primer performance Delivery schedule reflects contractor analysis to determine and correct the root cause of variance in primer performance Delivery delayed due to lead-times at energetics manufacturer. Production capacity has not yet equalized with increased demand from global conflicts. Delivery delayed due to lead-times at energetics manufacturer. Production capacity has not yet equalized with increased demand from global conflicts. LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 6 of 13 P-1 Line #10 Volume 1 - 124 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 .190 12 2025 NAVY 3.458 .000 3.458 3.458 12 2026 NAVY 4.550 .000 4.550 4.550 12 2027 NAVY 3.315 .000 3.315 3.315 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .000 .658 13 2021 NAVY .867 .000 .867 A - - - - - - .658 .867 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 .000 1.370 A - - - - - - - - - - - - - - - - - - - - - 1.370 14 2019 NAVY 4.679 .000 4.679 A - - - - - - - - - - - - - - - - - - - - - 4.679 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 .000 24.254 24.254 15 2023 NAVY 6.000 .000 6.000 6.000 15 2024 NAVY 4.401 .000 4.401 4.401 15 2025 NAVY 1.830 .000 1.830 1.830 16 2026 NAVY 5.008 .000 5.008 5.008 16 2027 NAVY 5.258 .000 5.258 5.258 2.8) CART., 57MM, HE-PD MK338 (BA64) (4) 17 2023 NAVY 7.496 .000 7.496 7.496 17 2024 NAVY 8.882 .000 8.882 8.882 17 2025 NAVY 2.332 .000 2.332 2.332 18 2027 NAVY 2.582 .000 2.582 2.582 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 125 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N Calendar Year 2022 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 .190 12 2025 NAVY 3.458 .000 3.458 3.458 12 2026 NAVY 4.550 .000 4.550 4.550 12 2027 NAVY 3.315 .000 3.315 3.315 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .000 .658 13 2021 NAVY .867 .000 .867 - - - - - - - - - - - - - - - - - - - - - - - - .658 A - - - - - - - - - - - - - - .867 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 .000 1.370 - - - - - - - - - - - - - - - - - - - - - - - - 1.370 14 2019 NAVY 4.679 .000 4.679 - - - - - - - - - - - - - - - - - - - - - - - - 4.679 A - - - - - - - - - 24.254 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 .000 24.254 15 2023 NAVY 6.000 .000 6.000 6.000 15 2024 NAVY 4.401 .000 4.401 4.401 15 2025 NAVY 1.830 .000 1.830 1.830 16 2026 NAVY 5.008 .000 5.008 5.008 16 2027 NAVY 5.258 .000 5.258 5.258 2.8) CART., 57MM, HE-PD MK338 (BA64) (4) 17 2023 NAVY 7.496 .000 7.496 7.496 17 2024 NAVY 8.882 .000 8.882 8.882 17 2025 NAVY 2.332 .000 2.332 2.332 18 2027 NAVY 2.582 .000 2.582 2.582 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 126 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 .190 12 2025 NAVY 3.458 .000 3.458 3.458 12 2026 NAVY 4.550 .000 4.550 4.550 12 2027 NAVY 3.315 .000 3.315 3.315 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .000 .658 - - - - - - - - - - - - - - - - - - - - - - - - .658 13 2021 NAVY .867 .000 .867 - - - - - - - - - - - - - - - - - - - - - - - - .867 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 .000 1.370 - - - - - - - - - - - - - - - - - - - - - - - - 1.370 14 2019 NAVY 4.679 .000 4.679 - - - - - - - - - - - - - - - - - - - - - - - - 4.679 - - - - - - - - - - - - - - - - - - - - - - - - 24.254 A - - - - - - - - - - - - - - - - 6.000 A - 4.401 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 .000 24.254 15 2023 NAVY 6.000 .000 6.000 15 2024 NAVY 4.401 .000 4.401 15 2025 NAVY 1.830 .000 1.830 1.830 16 2026 NAVY 5.008 .000 5.008 5.008 16 2027 NAVY 5.258 .000 5.258 5.258 2.8) CART., 57MM, HE-PD MK338 (BA64) (4) 17 2023 NAVY 7.496 .000 7.496 17 2024 NAVY 8.882 .000 8.882 17 2025 NAVY 2.332 .000 2.332 18 2027 NAVY 2.582 .000 2.582 A - - - - - - - - - - - - - 7.496 A - - - - - - - - - - - 8.882 2.332 2.582 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 127 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 A - - - - - - .190 12 2025 NAVY 3.458 .000 3.458 A - - - - - - 3.458 12 2026 NAVY 4.550 .000 4.550 A - - - - - - 4.550 12 2027 NAVY 3.315 .000 3.315 3.315 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .000 .658 - - .500 .158 13 2021 NAVY .867 .000 .867 - - - - - .500 .367 .000 .000 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 .000 1.370 - - - - - - - - - - - - - - - - - - - 1.370 14 2019 NAVY 4.679 .000 4.679 - - - - - - - - - - - - - - - - - - - 2.616 2.063 .000 .000 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 .000 24.254 - - - - - - - - - - - - - - - 4.000 4.000 4.000 4.000 4.000 4.254 15 2023 NAVY 6.000 .000 6.000 - - - - - - - - - - - - - - - - - - - - - - - 4.000 2.000 15 2024 NAVY 4.401 .000 4.401 - - - - - - - - - - - - - - - - - - - - - - - - 4.401 15 2025 NAVY 1.830 .000 1.830 A - - - - - - - - - - - - - - - - - - - - - - - - 1.830 16 2026 NAVY 5.008 .000 5.008 A - - - - - - 5.008 16 2027 NAVY 5.258 .000 5.258 2.8) CART., 57MM, HE-PD MK338 (BA64) .000 5.258 (4) 17 2023 NAVY 7.496 .000 7.496 - - - - - - - - - - - - - - - - - - - - 4.000 3.496 17 2024 NAVY 8.882 .000 8.882 - - - - - - - - - - - - - - - - - - - - - - - - 8.882 .000 17 2025 NAVY 2.332 .000 2.332 A - - - - - - - - - - - - - 2.332 18 2027 NAVY 2.582 .000 2.582 2.582 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 128 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 - - - - - - - - - - - - - - - - - - - - - - - - .190 12 2025 NAVY 3.458 .000 3.458 - - - - - - - - - - - - - - - - - - - - - - - - 3.458 12 2026 NAVY 4.550 .000 4.550 - - - - - - - - - - - - - - - - - - - - - - - - 4.550 12 2027 NAVY 3.315 .000 3.315 A - - - - - - - - - - - - - - - - - - - 3.315 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .658 .000 .000 13 2021 NAVY .867 .867 .000 .000 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 1.370 .000 .000 14 2019 NAVY 4.679 4.679 .000 .000 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 24.254 .000 15 2023 NAVY 6.000 4.000 2.000 2.000 15 2024 NAVY 4.401 .000 4.401 - 4.000 .401 15 2025 NAVY 1.830 .000 1.830 - - - - - - - 1.830 16 2026 NAVY 5.008 .000 5.008 - - - - - - - - - - - - - - - - - - - - - 4.000 1.008 16 2027 NAVY 5.258 .000 5.258 A - - - - - - - - - - - - - - - - - - 2.8) CART., 57MM, HE-PD MK338 (BA64) .000 .000 .000 .000 .000 - 5.258 (4) 17 2023 NAVY 7.496 7.496 .000 17 2024 NAVY 8.882 .000 8.882 - 4.000 4.000 .882 .000 17 2025 NAVY 2.332 .000 2.332 - - - - 18 2027 NAVY 2.582 .000 2.582 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N .000 F E B - 2.332 A - - M A R A P R .000 M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G - 2.582 S E P Volume 1 - 129 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Intermediate Caliber Gun Ammo Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 2) AL100 INTERMEDIATE CALIBER GUN AMMUNITION HARDWARE 2.3) CART., 57MM, 3P MK295 (BA22) (3) Prior Years Deliveries: 16457 12 2024 NAVY .190 .000 .190 - - - - - - .190 12 2025 NAVY 3.458 .000 3.458 - - - - - - 1.000 1.000 1.000 .458 .000 12 2026 NAVY 4.550 .000 4.550 - - - - - - 1.000 1.000 1.000 1.000 .550 12 2027 NAVY 3.315 .000 3.315 - - - - - - - - - - - .000 .000 - - - - - - 1.000 1.000 1.000 .315 .000 2.5) ALaMO MK332 (BA59) Prior Years Deliveries: 834 13 2020 NAVY .658 .658 .000 .000 13 2021 NAVY .867 .867 .000 .000 2.6) CART., 57MM, HE-PD MK334 (BA60) Prior Years Deliveries: 4300 14 2018 NAVY 1.370 1.370 .000 .000 14 2019 NAVY 4.679 4.679 .000 .000 2.7) CART., 57MM TP MK337 (BA63) Prior Years Deliveries: 7844 15 2022 NAVY 24.254 24.254 .000 .000 15 2023 NAVY 6.000 6.000 .000 .000 15 2024 NAVY 4.401 4.401 .000 .000 15 2025 NAVY 1.830 1.830 .000 .000 16 2026 NAVY 5.008 5.008 .000 16 2027 NAVY 5.258 .000 5.258 2.8) CART., 57MM, HE-PD MK338 (BA64) .000 - - - - - 4.000 1.258 .000 (4) 17 2023 NAVY 7.496 7.496 .000 .000 17 2024 NAVY 8.882 8.882 .000 .000 17 2025 NAVY 2.332 2.332 .000 18 2027 NAVY 2.582 .000 2.582 .000 O C T LI 0266 - Intermediate Caliber Gun Ammo Navy N O V D E C J A N F E B 2.582 M A R .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 130 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0266 / Intermediate Caliber Gun Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Production Rates (Each / Year) MFR Ref # Aggregated Items: Intermediate Caliber Gun Ammo Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 BAE SYSTEMS INC MINNESOTA 2 L-3 HARRIS - PLANO, TX ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 10,000 40,000 100,000 6 6 33 39 6 6 25 31 500 5,000 10,000 6 3 14 17 6 3 12 15 3 NAMMO PERRY INC PERRY, FL 10,000 12,000 30,000 6 6 24 30 6 6 20 26 4 GDOTS CANADA - CANADA 1,000 12,000 30,000 6 6 24 30 6 6 18 24 5 TBD - TBD 1,000 12,000 30,000 6 6 24 30 6 6 18 24 6 NAMMO PERRY INC. PERRY, FL 1,000 12,000 30,000 6 6 12 18 6 6 6 12 0 0 0 0 0 0 0 0 7 TBD - TBD TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0266 - Intermediate Caliber Gun Ammo Navy UNCLASSIFIED Page 13 of 13 P-1 Line #10 Volume 1 - 131 === page 160 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 132 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 426.965 426.965 426.965 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 56.679 42.162 43.106 0.000 43.106 45.309 46.197 47.164 48.107 - - - - - - - - - - - 56.679 42.162 43.106 0.000 43.106 45.309 46.197 47.164 48.107 - - - - - - - - - - - 56.679 42.162 43.106 0.000 43.106 45.309 46.197 47.164 48.107 - Total 755.689 755.689 755.689 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Program provides for Other Ship Gun Ammunition which consists of medium caliber types (20MM, 25MM, 30MM, 40MM). This supports Navy ships, and active and reserve ashore warfare forces including Naval Expeditionary Combat Command (NECC), Mobile Security Forces (MSF), fleet combat readiness groups, inshore undersea warfare groups and several other types of operational units. Program includes support for emergent anti-terrorism/force protection and homeland defense requirements. Program provides for Other Ship Gun Ammunition support for Naval Special Warfare (NSW) service common munitions which are required to provide US Navy SEAL teams, NSW small tactical units and task groups, and Special Boat Teams with a fire power advantage, area target engagement, standoff and extended range capability, as well as an anti-armor capability. This includes medium caliber mortars (20MM 81MM) and Javelin. These munitions provide NSW an essential force protection capability and increases the combat power of NSW tactical elements. LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 1 of 20 P-1 Line #11 Volume 1 - 133 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Integrated Warfare Systems P-5a, P-21 - / 352.516 - / 51.269 - / 35.258 - / 35.874 - / 0.000 - P-5 2 / Naval Special Warfare P-5a - / 74.449 - / 5.410 - / 6.904 - / 7.232 - / 0.000 - / 7.232 P-40 Total Gross/Weapon System Cost - / 426.965 - / 56.679 - / 42.162 - / 43.106 - / 0.000 - / 43.106 / 35.874 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding procures 20MM ammunition used for ship defense in MK15 Close-In Weapon System, 25MM ammunition used for Fast Attack Craft/Fast Attack In-Shore Craft (FAC/FIAC) defense in MK38 Machine Gun System on all platforms other than LPD and LCS, and 30MM ammunition used for FAC/FIAC defense in MK46 MOD 2 Gun Weapon System on LPD and LCS. Baseline funding also provides Production Engineering and Gauge requirements for 20MM, 25MM, and 30MM ammunition. FY 2027 baseline funding procures grenades, 60mm mortar ammunition, and Javelin missile equipment. Baseline funding also provides Production Engineering for Naval Special Warfare (NSW). LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 2 of 20 P-1 Line #11 Volume 1 - 134 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 51.269 35.258 35.874 0.000 35.874 - Gross/Weapon System Cost ($ in Millions) 352.516 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 352.516 Plus CY Advance Procurement ($ in Millions) - - - - - 51.269 35.258 35.874 0.000 35.874 - Total Obligation Authority ($ in Millions) 352.516 FY 2027 Total - - - - - 51.269 35.258 35.874 0.000 35.874 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - 25MM - (AG100) CARTRIDGES Cost Recurring Cost 1.1.1) CTG, 25MM, (†) TP-T, M793 (A976) 37.23 Subtotal: Recurring Cost - Subtotal: Hardware - 25MM - (AG100) CARTRIDGES Cost - (1) 962,497 35.836 45.24 90,734 4.105 - - 0.000 45.26 - 35.836 - - 4.105 - - 0.000 - - 35.836 - - 4.105 - - 0.000 - - 0.000 - - 0.000 8,766 9.680 10,706 11.918 100,000 4.526 - - 0.000 45.26 100,000 4.526 - 4.526 - - 0.000 - - 4.526 - - 4.526 - - 0.000 - - 4.526 - - 0.000 - - 0.000 - - 0.000 6,545 7.732 - - 0.000 6,545 7.732 Hardware - 30MM - (AG100) CARTRIDGES Cost Recurring Cost 2.1.1) CART., 30MM (†) TP-T LKD (AA90) 2.1.2) Cart C-UAS, 30MM (AD11) (†) 55.01 317,003 17.438 1,077.65 19,072 20.553 1,104.31 1,113.23 1,181.36 1,181.36 Subtotal: Recurring Cost - - 37.991 - - 9.680 - - 11.918 - - 7.732 - - 0.000 - - 7.732 Subtotal: Hardware - 30MM - (AG100) CARTRIDGES Cost - - 37.991 - - 9.680 - - 11.918 - - 7.732 - - 0.000 - - 7.732 - 5.143 - - 0.221 - - 0.324 - - 0.322 - - 0.000 - - 0.322 Hardware - OTHER - (AG100) CARTRIDGES Cost Recurring Cost 3.1.1) TRANSPORTATION ACCT CODE - LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 3 of 20 P-1 Line #11 Volume 1 - 135 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 3.1.2) PE/QA SMCA - - 3.713 - - 0.096 - - 0.228 - - 0.200 - - 0.000 - - 0.200 Subtotal: Recurring Cost - - 8.856 - - 0.317 - - 0.552 - - 0.522 - - 0.000 - - 0.522 - - 8.856 - - 0.317 - - 0.552 - - 0.522 - - 0.000 - - 0.522 Subtotal: Hardware - OTHER - (AG100) CARTRIDGES Cost Hardware - (AG200) CARTRIDGES Cost Recurring Cost 4.1.1) CART., 20MM DUMMY, M51A4N 15.50 464,925 7.205 25.32 20,000 0.506 25.49 20,000 0.510 26.72 21,000 0.561 - - 0.000 26.72 21,000 0.561 MK 244 ELC (AA61) 36.97 5,552,433 205.258 57.69 136,768 7.890 57.26 314,400 18.003 59.39 309,980 18.410 - - 0.000 59.39 309,980 18.410 Subtotal: Recurring Cost - - 212.463 - - 8.396 - - 18.513 - - 18.971 - - 0.000 - - 18.971 - - 212.463 - - 8.396 - - 18.513 - - 18.971 - - 0.000 - - 18.971 (†) (AA20) 4.1.2) CART., 20MM (†) (2) Subtotal: Hardware (AG200) CARTRIDGES Cost Hardware - OTHER - (AG200) CARTRIDGES Cost Recurring Cost 5.1.1) PE/QA SMCAAG200 - - 1.571 - - 0.352 - - 0.144 - - 0.084 - - 0.000 - - 0.084 Subtotal: Recurring Cost - - 1.571 - - 0.352 - - 0.144 - - 0.084 - - 0.000 - - 0.084 - - 1.571 - - 0.352 - - 0.144 - - 0.084 - - 0.000 - - 0.084 14.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - OTHER - (AG200) CARTRIDGES Cost Hardware - (AGUKR) UKRAINE FUNDING Cost Recurring Cost 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) (†) Subtotal: Recurring Cost Subtotal: Hardware (AGUKR) UKRAINE FUNDING Cost 65.41 227,616 - - 14.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 14.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AG894) GAUGE REQUIREMENTS Cost Recurring Cost 7.1.1) GAUGE REQUIREMENTS - - 1.583 - - 0.177 - - 0.180 - - 0.174 - - 0.000 - - 0.174 Subtotal: Recurring Cost - - 1.583 - - 0.177 - - 0.180 - - 0.174 - - 0.000 - - 0.174 LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 4 of 20 P-1 Line #11 Volume 1 - 136 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware - (AG894) GAUGE REQUIREMENTS Cost - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 1.583 - - 0.177 - - 0.180 - - 0.174 - - 0.000 - - 0.174 Hardware - Product Improvement Program (AG850) Cost Recurring Cost 8.1.1) (AG850) Product Improvement - - 12.078 - - 1.002 - - 1.002 - - 1.000 - - 0.000 - - 1.000 - - 12.078 - - 1.002 - - 1.002 - - 1.000 - - 0.000 - - 1.000 - - 12.078 - - 1.002 - - 1.002 - - 1.000 - - 0.000 - - 1.000 - - 0.000 2,749 3.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 3.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - 30mm CUAS Rounds Cost - - 0.000 - - 3.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Program (3) Subtotal: Recurring Cost Subtotal: Hardware Product Improvement Program (AG850) Cost Hardware - 30mm CUAS Rounds Cost Recurring Cost 9.1.1) Cart C-UAS, 30MM (AD11) (†) 1,091.40 Hardware - (AGUKR) UKRAINE SUPPLEMENTAL (TRANCHE 27) Cost Recurring Cost 10.1.1) Cart C-UAS, 30MM (AD11) (†) 10.1.2) CART., 40MM HE-DP, M430A1, LINKED (B542) (†) Subtotal: Recurring Cost Subtotal: Hardware (AGUKR) UKRAINE SUPPLEMENTAL (TRANCHE 27) Cost - - 0.000 1,091.40 9,163 10.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 67.24 73,950 4.972 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 14.972 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 14.972 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AGUKR) UKRAINE SUPPLEMENTAL (TRANCHE 28) Cost Recurring Cost 11.1.1) CTG, 25MM, (†) - - 0.000 53.46 97,260 5.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 11.1.2) CART., 20MM DUMMY, M51A4N - - 0.000 20.37 60,100 1.224 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 6.424 - - 0.000 - - 0.000 - - 0.000 - - 0.000 TP-T, M793 (A976) (†) (AA20) Subtotal: Recurring Cost LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 5 of 20 P-1 Line #11 Volume 1 - 137 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware (AGUKR) UKRAINE SUPPLEMENTAL (TRANCHE 28) Cost - FY 2025 Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 6.424 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AG00079) ISRAEL SUPPLEMENTAL (TRANCHE 10) Cost Non Recurring Cost 12.1.1) CART., 20MM (†) MK 244 ELC (AA61) Subtotal: Non Recurring Cost Subtotal: Hardware (AG00079) ISRAEL SUPPLEMENTAL (TRANCHE 10) Cost - - 0.000 57.08 262 0.015 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.015 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.015 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - (AG830) PRODUCTION ENGINEERING Cost 13.1) PRODUCTION ENGINEERING - - 27.250 - - 2.829 - - 2.949 - - 2.865 - - 0.000 - - 2.865 Subtotal: Support (AG830) PRODUCTION ENGINEERING Cost - - 27.250 - - 2.829 - - 2.949 - - 2.865 - - 0.000 - - 2.865 Gross/Weapon System Cost - - 352.516 - - 51.269 - - 35.258 - - 35.874 - - 0.000 - - 35.874 Remarks: [Hardware] AG100/AG200: INTEGRATED WARFARE SYSTEMS - Provides all up rounds and acceptance testing. Unit costs and quantities are adjusted during year of execution. Provides for Transportation Account Code (TAC) first destination delivery of production items and Single Manager Conventional Ammunition (SMCA) related costs. [Hardware] AG894: GAUGE REQUIREMENTS - Provides for procurement of gauges, auxiliary and test equipment, and support costs necessary for ammunition metrology to check critical dimensions/ parameters of ammunition items and their parts. This is to assure proper mating of parts and subassemblies, assure correct interfacing between the ammunition and guns, and proper ammunition performance [Hardware] Funds provided through Congressional program increase for 30MM Rounds in support of FY2025 CUAS efforts, Full-Year Continuing Appropriations and Extensions Act, 2025 (P.L. 119-4). [Hardware] AGUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 27, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] AGUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 28, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] AG00079: Supplemental funds provided in support of FY2025 Israel Security Supplemental Tranche 10, Appropriations Act, 2024 (Division A of Public Law 118-50). [Support Cost] AG830: PRODUCTION ENGINEERING - Provides for production engineering services to support new acquisition and in production ammunition. LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 6 of 20 P-1 Line #11 Volume 1 - 138 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (1) (2) FY2025 and FY2027 unit cost increase due to increased material costs. Item Number 4.1.2) CART., 20MM MK 244 ELC (AA61) FY2025 to FY2026 funding increased to return procurement to baseline levels required to support fleet needs. FY2025 updated to reflect actuals. Unit cost increase due to increase in material costs. (3) AG850: FY2027 8.1.1 Product Improvement Program (PIP) funds will be used to qualify to joint service counter unmanned aerial system cartridges for Navy use. LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 7 of 20 P-1 Line #11 Volume 1 - 139 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 O O C Cost Elements 1.1.1) CTG, 25MM, TP-T, M793 Method/Type or Funding Vehicle GENERAL DYNAMICS OTS / MARION, IL 1.1.1) CTG, 25MM, TP-T, M793 (†) (A976) 2025 1.1.1) CTG, 25MM, TP-T, M793 (†) (A976) 2.1.1) CART., 30MM TP-T LKD (AA90) (†) 2.1.2) Cart C-UAS, 30MM (AD11) (†) 2.1.2) Cart C-UAS, 30MM (AD11) (†) 2.1.2) Cart C-UAS, 30MM (AD11) (†) 2.1.2) Cart C-UAS, 30MM (AD11) (†) Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery (Each) C / FFP JMC ROCK ISLAND Jul 2023 Jan 2025 157,300 33.82 Y Oct 2017 GENERAL DYNAMICS OTS / MARION, IL C / FFP JMC ROCK ISLAND Jul 2025 Sep 2026 90,734 45.24 Y Feb 2023 2027 TBD / TBD C / FFP JMC ROCK ISLAND Mar 2027 May 2028 100,000 45.26 Y Feb 2023 2022 GENERAL DYNAMICS OTS / MARION, IL C / FFP JMC ROCK ISLAND Jul 2022 Jan 2024 23,152 56.58 Y May 2020 2023 AMERICAN RHEINMETALL MUNITIONS (ARM) / STAFFORD, VA C / FFP NSWC DD Jun 2024 Jun 2025 5,654 1,133.00 Y Dec 2020 2024 AMERICAN RHEINMETALL MUNITIONS (ARM) / STAFFORD, VA C / FFP NSWC DD Jul 2024 Apr 2026 10,418 1,070.00 Y Dec 2020 2025 AMERICAN RHEINMETALL MUNITIONS (ARM) / STAFFORD, VA C / FFP NSWC DD Sep 2025 Dec 2026 8,766 1,104.31 Y Sep 2024 2026 AMERICAN RHEINMETALL MUNITIONS (ARM) / STAFFORD, VA C / FFP NSWC DD Mar 2026 Sep 2027 10,706 1,113.23 Y Sep 2024 FY 2023 (†) (A976) P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition (4) Contractor and Location Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 2027 TBD / TBD C / FFP NSWC DD Mar 2027 Sep 2028 6,545 1,181.36 Y Sep 2024 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2021 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Sep 2021 Dec 2023 50,000 19.32 Y Nov 2018 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2022 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Jun 2022 Dec 2023 48,089 22.04 Y Nov 2021 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2023 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD May 2023 Jun 2024 20,000 21.61 Y Nov 2021 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2024 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Mar 2024 Mar 2025 20,000 27.25 Y Nov 2021 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2025 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Mar 2025 Mar 2026 20,000 25.32 Y Nov 2021 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2026 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Mar 2026 Mar 2027 20,000 25.49 Y Nov 2021 4.1.1) CART., 20MM DUMMY, M51A4N (AA20) 2027 RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP NSWC IHD Mar 2027 Mar 2028 21,000 26.72 Y Nov 2021 2023 GD-OTS / MARION, IL C / FFP JMC ROCK ISLAND Jun 2023 Aug 2024 368,719 40.60 Y Oct 2017 2024 NGIS / Lake City, MO C / FFP JMC ROCK ISLAND May 2024 May 2026 270,580 61.28 Y Mar 2023 2025 GD-OTS / MARION, IL C / FFP JMC ROCK ISLAND Jun 2025 Dec 2025 136,768 57.69 Y Mar 2023 2.1.2) Cart C-UAS, 30MM (AD11) 4.1.2) CART., 20MM MK 244 ELC (AA61) (†) 4.1.2) CART., 20MM MK 244 ELC (AA61) (†) 4.1.2) CART., 20MM MK 244 ELC (AA61) (†) LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 8 of 20 P-1 Line #11 Volume 1 - 140 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 FY Contractor and Location 2026 TBD / TBD C / FFP JMC ROCK ISLAND Jun 2026 Sep 2027 314,400 57.26 Y Mar 2023 2027 TBD / TBD C / TBD JMC ROCK ISLAND Mar 2027 Sep 2028 309,980 59.39 Y Mar 2023 2023 AMTEC Corp. / Janesville, WI C / FFP JMC ROCK ISLAND Jun 2024 Apr 2026 227,616 65.41 Y Sep 2021 2025 AMERICAN RHEINMETALL MUNITIONS / STAFFORD, VA C / FFP NSWC DAHLGREN Sep 2025 Dec 2026 2,749 1,091.40 Y Mar 2025 2025 AMERICAN RHEINMETALL MUNITIONS (ARM) / STAFFORD, VA C / FFP NSWC DAHLGREN Sep 2025 Sep 2026 9,163 1,091.40 Y Mar 2025 10.1.2) CART., 40MM HE-DP, M430A1, LINKED (B542) 2025 AMTEC CORPORATION / JANESVILE, WI C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 73,950 67.24 Y Dec 2024 11.1.1) CTG, 25MM, TP-T, M793 (A976) 2025 GD-OTS / MARION, IL C / FFP JMC ROCK ISLAND Jul 2025 Jul 2026 97,260 53.46 Y Dec 2024 11.1.2) CART., 20MM DUMMY, M51A4N (AA20) 2025 RTI TECHNOLOGIES / COLUMBIA, CT C / FFP NSWC IHD Mar 2025 Mar 2026 60,100 20.37 Y Dec 2024 12.1.1) CART., 20MM MK 244 ELC (AA61) 2025 TBD / TBD C / FFP JMC ROCK ISLAND Jun 2026 Sep 2027 262 57.08 Y Mar 2023 4.1.2) CART., 20MM MK 244 ELC (AA61) (†) 4.1.2) CART., 20MM MK 244 ELC (AA61) (†) 6.1.1) CART., 40MM HE-DP, (†) M430A1, LINKED (B542) 9.1.1) Cart C-UAS, 30MM (AD11) 10.1.1) Cart C-UAS, 30MM (AD11) (†) Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Footnotes: (4) FY 2023 order delayed to combine award with a Foreign Military Sales order to achieve the most economical unit cost. LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 9 of 20 P-1 Line #11 Volume 1 - 141 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT 1.1.1) CTG, 25MM, TP-T, M793 (A976) Fiscal Year 2022 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 805197 1 2023 NAVY 157.300 .000 157.300 1 2025 NAVY 90.734 .000 90.734 157.300 90.734 2 2027 NAVY 100.000 .000 100.000 100.000 2.1.2) Cart C-UAS, 30MM (AD11) Prior Years Deliveries: 3000 3 2023 NAVY 5.654 .000 5.654 5.654 3 2024 NAVY 10.418 .000 10.418 10.418 3 2025 NAVY 8.766 .000 8.766 8.766 3 2026 NAVY 10.706 .000 10.706 10.706 4 2027 NAVY 6.545 .000 6.545 6.545 4.1.2) CART., 20MM MK 244 ELC (AA61) (2) Prior Years Deliveries: 4913134 5 2023 NAVY 368.719 .000 368.719 368.719 6 2024 NAVY 270.580 .000 270.580 270.580 5 2025 NAVY 136.768 .000 136.768 136.768 7 2026 NAVY 314.400 .000 314.400 314.400 7 2027 NAVY 309.980 .000 309.980 309.980 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) 8 2023 NAVY 227.616 .000 227.616 227.616 O C T LI 0270 - Other Ship Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 142 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 1.1.1) CTG, 25MM, TP-T, M793 (A976) Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 805197 1 2023 NAVY 157.300 .000 157.300 1 2025 NAVY 90.734 .000 90.734 A - - - - - - - - - - - - - - - 157.300 90.734 2 2027 NAVY 100.000 .000 100.000 100.000 2.1.2) Cart C-UAS, 30MM (AD11) Prior Years Deliveries: 3000 3 2023 NAVY 5.654 .000 3 2024 NAVY 10.418 .000 10.418 3 2025 NAVY 8.766 .000 8.766 8.766 3 2026 NAVY 10.706 .000 10.706 10.706 4 2027 NAVY 6.545 .000 6.545 4.1.2) CART., 20MM MK 244 ELC (AA61) 5.654 A - - - - 5.654 A - - - 10.418 6.545 (2) Prior Years Deliveries: 4913134 5 2023 NAVY 368.719 .000 368.719 6 2024 NAVY 270.580 .000 270.580 A - - - - - - - - - - - - - - A - - - 60.000 60.000 248.719 5 2025 NAVY 136.768 .000 136.768 136.768 7 2026 NAVY 314.400 .000 314.400 314.400 7 2027 NAVY 309.980 .000 309.980 309.980 - - 270.580 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) 8 2023 NAVY 227.616 .000 227.616 A O C T LI 0270 - Other Ship Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G - 227.616 S E P Volume 1 - 143 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 1.1.1) CTG, 25MM, TP-T, M793 (A976) Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 805197 1 2023 NAVY 157.300 .000 157.300 1 2025 NAVY 90.734 .000 90.734 2 2027 NAVY 100.000 .000 100.000 - - - 80.000 77.300 .000 A - - - - - - - - - - - - - - 90.734 .000 100.000 2.1.2) Cart C-UAS, 30MM (AD11) Prior Years Deliveries: 3000 3 2023 NAVY 5.654 .000 5.654 - - - - - - - - 1.500 1.500 1.500 1.154 3 2024 NAVY 10.418 .000 10.418 - - - - - - - - - - - - - - - - - - 10.418 3 2025 NAVY 8.766 .000 A - - - - - - - - - - - - - 8.766 3 2026 NAVY 10.706 .000 10.706 A - - - - - - - 10.706 4 2027 NAVY 6.545 .000 4.1.2) CART., 20MM MK 244 ELC (AA61) 8.766 .000 .000 6.545 6.545 (2) Prior Years Deliveries: 4913134 5 2023 NAVY 368.719 6 2024 NAVY 270.580 120.000 248.719 60.000 60.000 60.000 68.719 .000 270.580 5 2025 NAVY 136.768 .000 136.768 7 2026 NAVY 314.400 .000 314.400 7 2027 NAVY 309.980 .000 309.980 - - - .000 - - - - - - - - - - - A - - - - - - - - - - - 60.000 60.000 60.000 60.000 30.580 60.000 60.000 16.768 .000 .000 A - - - - 314.400 309.980 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) 8 2023 NAVY 227.616 .000 227.616 O C T LI 0270 - Other Ship Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R 227.616 A P R .000 M A Y J U N J U L A U G S E P Volume 1 - 144 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1.1.1) CTG, 25MM, TP-T, M793 (A976) Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 805197 1 2023 NAVY 157.300 157.300 .000 1 2025 NAVY 90.734 90.734 .000 2 2027 NAVY 100.000 .000 .000 .000 100.000 A - - - - - - - - - - - - - - 80.000 20.000 .000 2.1.2) Cart C-UAS, 30MM (AD11) Prior Years Deliveries: 3000 3 2023 NAVY 5.654 5.654 .000 3 2024 NAVY 10.418 10.418 .000 3 2025 NAVY 8.766 .000 8.766 - - 2.000 2.000 2.000 2.000 .766 3 2026 NAVY 10.706 .000 10.706 - - - - - - - - - - - 2.000 2.000 2.000 2.000 2.000 .706 4 2027 NAVY 6.545 .000 A - - - - - - - - - - - - 4.1.2) CART., 20MM MK 244 ELC (AA61) .000 .000 6.545 .000 .000 - - - - - - 2.000 4.545 (2) Prior Years Deliveries: 4913134 5 2023 NAVY 368.719 368.719 .000 .000 6 2024 NAVY 270.580 270.580 .000 .000 5 2025 NAVY 136.768 136.768 .000 7 2026 NAVY 314.400 .000 314.400 7 2027 NAVY 309.980 .000 309.980 .000 - - - - - - - - - - - A - - - - - - 60.000 60.000 60.000 60.000 60.000 14.400 - - - - - .000 - - - - - - - 60.000 249.980 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) 8 2023 NAVY 227.616 227.616 .000 .000 O C T LI 0270 - Other Ship Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 1.1.1) CTG, 25MM, TP-T, M793 (A976) Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 805197 1 2023 NAVY 157.300 157.300 .000 .000 1 2025 NAVY 90.734 90.734 .000 .000 2 2027 NAVY 100.000 100.000 .000 .000 2.1.2) Cart C-UAS, 30MM (AD11) Prior Years Deliveries: 3000 3 2023 NAVY 5.654 5.654 .000 .000 3 2024 NAVY 10.418 10.418 .000 .000 3 2025 NAVY 8.766 8.766 .000 .000 3 2026 NAVY 10.706 10.706 .000 4 2027 NAVY 6.545 2.000 4.545 4.1.2) CART., 20MM MK 244 ELC (AA61) .000 2.000 2.000 .545 .000 (2) Prior Years Deliveries: 4913134 5 2023 NAVY 368.719 368.719 .000 .000 6 2024 NAVY 270.580 270.580 .000 .000 5 2025 NAVY 136.768 136.768 .000 .000 7 2026 NAVY 314.400 314.400 .000 7 2027 NAVY 309.980 60.000 249.980 60.000 60.000 60.000 60.000 .000 9.980 .000 6.1.1) CART., 40MM HE-DP, M430A1, LINKED (B542) 8 2023 NAVY 227.616 227.616 .000 .000 O C T LI 0270 - Other Ship Gun Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 146 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS OTS - MARION, IL 5,000 840,000 1,700,000 6 6 16 22 6 6 12 18 2 TBD - TBD 5,000 840,000 1,700,000 6 6 16 22 6 6 12 18 3 AMERICAN RHEINMETALL MUNITIONS (ARM) STAFFORD, VA 1,000 1,500 72,000 6 6 18 24 6 6 12 18 4 TBD - TBD 1,000 1,500 72,000 6 6 18 24 6 6 12 18 5 GD-OTS - MARION, IL 5,000 840,000 1,700,000 6 6 10 16 6 6 5 11 6 NGIS - Lake City, MO 5,000 840,000 1,700,000 6 6 12 18 6 6 16 22 7 TBD - TBD 5,000 840,000 1,700,000 6 6 24 30 6 6 15 21 500,000 840,000 1,700,000 6 6 24 30 6 6 18 24 8 AMTEC Corp. - Janesville, WI "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 15 of 20 P-1 Line #11 Volume 1 - 147 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 74.449 5.410 6.904 7.232 0.000 7.232 - - - - - - 74.449 5.410 6.904 7.232 0.000 7.232 - - - - - - 74.449 5.410 6.904 7.232 0.000 7.232 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - AGNSW PE/QA SMCA Cost Recurring Cost 1.1.1) AGNSW PE/QA (5) - - 3.841 - - 0.634 - - 0.646 - - 0.659 - - 0.000 - - 0.659 Subtotal: Recurring Cost - - 3.841 - - 0.634 - - 0.646 - - 0.659 - - 0.000 - - 0.659 Subtotal: Hardware AGNSW PE/QA SMCA Cost - - 3.841 - - 0.634 - - 0.646 - - 0.659 - - 0.000 - - 0.659 - - 1.043 5.63 8,000 0.045 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.2) C868 81MM HE M821A2 - - 2.534 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.3) C869 81MM HE M889A1 - - 0.301 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.4) CTG., 40MM PRACTICE M781 f/ M203 Gren Launcher (B519) - - 0.693 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.5) CTG 40MM PRACTICE M395A1 (B576) - - 2.337 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.6) CTG., 40MM PRACTICE, DAY/ 33.21 96,738 3.213 32.64 48,468 1.582 - - 0.000 33.95 37,201 1.263 - - 0.000 33.95 37,201 1.263 SMCA Hardware - AGNSW Hardware Cost Recurring Cost 2.1.1) CTG, 60MM, FULL RANGE PRACTICE, M769 (BA15) (6) LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 16 of 20 P-1 Line #11 Volume 1 - 148 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) NIGHT MARKER MK281 (BA21) (†) (7) 2.1.7) 40MM LV TP DAY/NIGHT/ THERMAL M781E1 17.05 16,544 0.282 - - 0.000 18.10 25,249 0.457 - - 0.000 - - 0.000 - - 0.000 442.74 10,557 4.674 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 543.22 9,764 5.304 - - 0.000 - - 0.000 564.30 3,544 2.000 - - 0.000 564.30 3,544 2.000 623.70 1,443 0.900 - - 0.000 545.66 5,811 3.171 - - 0.000 - - 0.000 - - 0.000 9,200.27 754 6.937 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 589.78 685 0.404 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,011.95 2,175 2.201 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,302K 21 27.339 10 2.033 - - 0.000 - - 0.000 - - 0.000 - - 0.000 26,970.59 34 0.917 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 221,967.74 31 6.881 0.463 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 14 2.322 16 2.707 - - 0.000 16 2.707 217.56 1,287 0.280 - - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 (†) (8) (BA54) 2.1.8) CTG, 60 MM HE-PD M88 M935 (B643) 2.1.9) CTG, 60MM, M720A2 W/M734, (†) (9) (BA44) 2.1.10) CTG, MORTAR 81MM HE M889 SERIES W/PD (†) (10) FUZE (CA63) 2.1.11) ROCKET, 66MM, LAAW, FFE, HEAT, M72A8 (†) (HB25) 2.1.12) CTG 81MM ILLUM M853A1 W/ FUZE TIME (C871) (†) 2.1.13) CTG, 60MM HE MAPAM M1081 W/FUZE M734A1 (†) (BA42) 2.1.14) JAVELIN BLOCK 1 FGM148F (PMC1) (†) 2.1.15) JAVELIN COMPONENTS (TB06) 2.1.16) GUIDED MISSILE JAVELIN LIGHT WEIGHT (LCLU) - 231,486.00 2 (†) 2.1.17) JAVELIN BLOCK 1 FGM148C (PMCI) 203,273.00 (11) 2.1.18) 81MM FRPC (†) M879A1 (C875) LI 0270 - Other Ship Gun Ammunition Navy 165,871.00 - UNCLASSIFIED Page 17 of 20 169,188.00 - P-1 Line #11 169,188.00 - Volume 1 - 149 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Recurring Cost Subtotal: Hardware AGNSW Hardware Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 66.240 - - 4.123 - - 5.950 - - 5.970 - - 0.000 - - 5.970 - - 66.240 - - 4.123 - - 5.950 - - 5.970 - - 0.000 - - 5.970 Hardware - AGNSW TRANSPORTATION CODE Cost Recurring Cost 3.1.1) AGNSW TAC CODE - - 0.556 - - 0.057 - - 0.053 - - 0.040 - - 0.000 - - 0.040 Subtotal: Recurring Cost - - 0.556 - - 0.057 - - 0.053 - - 0.040 - - 0.000 - - 0.040 Subtotal: Hardware - AGNSW TRANSPORTATION CODE Cost - - 0.556 - - 0.057 - - 0.053 - - 0.040 - - 0.000 - - 0.040 Support - AGNSW PRODUCTION ENGINEERING Cost 4.1) Production Engineering - - 3.812 - - 0.596 - - 0.255 - - 0.563 - - 0.000 - - 0.563 Subtotal: Support AGNSW PRODUCTION ENGINEERING Cost - - 3.812 - - 0.596 - - 0.255 - - 0.563 - - 0.000 - - 0.563 Gross/Weapon System Cost - - 74.449 - - 5.410 - - 6.904 - - 7.232 - - 0.000 - - 7.232 Remarks: [Hardware] HARDWARE - Provides all up rounds and acceptance testing. Unit costs and quantities are adjusted during the year of execution. [Hardware] TRANSPORTATION CODE - Provides funding for Transportation Account Code (TAC) first destination delivery of production items and Single Manager Conventional Ammunition (SMCA) related costs. [Support Cost] PRODUCTION ENGINEERING - Provides funding for production engineering services to support new acquisition and in production ammunition. Funding also supports active services in the issuance, acceptance, and safety validation/verification when fielding new munitions. (†) indicates the presence of a P-5a Footnotes: (5) Single Manager for Convention Ammunition (SMCA) Engineering Support of Items in Production (ESIP) provides for civilian personnel salaries, materiel costs and travel/per diem of civilian and military personnel performing production engineering activities directly associated with product procurement related to end items including components/parts. ESIP costs will vary year to year with the complexity of the items procured, amounts of undelivered quantity, and the amount of problems encountered by the vendors. (6) CTG, 60MM, FULL RANGE PRACTICE, M769 (BA15) is used in some of the pre-deployment mortar training to conserve the limited assets of the more expensive HE mortar cartridges. LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 18 of 20 P-1 Line #11 Volume 1 - 150 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: (7) This is a priority procurement as Naval Special Warfare (NSW) is well below Total Munitions Requirement (TMR) with less than two year's worth of training stocks. This is a non-dud producing munitions, which complies with range restrictions at many of the locations where Naval Special Warfare (NSW) conducts training. (8) CTG, 40MM, Low Velocity, Target Practice, Day/Night/Thermal, M781E1 will replace CTG, 40MM, Low Velocity, Target Practice, M781 (B519) as it provides more training capability and B519 will no longer be available through the Single Manager for Conventional Ammunition. B519 is safer (non-dud producing) and lower cost than using HE cartridges for training. Current inventory is 95% of TMR. Increase to procurement schedule due to an expiring capability. New capability has yet to be approved. (9) CTG, 60MM, HE, M720A2, with M734A1 Fuze (BA44) will replace CTG, 60MM, HE, M888, with M935 Fuze (B643) in NSW inventory, which is over 20 years old and has experienced a high Dud rate. Current serviceable inventory is 90% of War Reserve and less than 50% of TMR. CTG, 60MM, HE, M720A1, with M734A1 Fuze (BA16), which is on order, will also be replaced by BA44. BA44 uses a less sensitive energetic fill. Note, based on prior procurement expect a delivery lead time of 3 to 4 years. (10) CTG, MORTAR SMME HE M889 SERIES W/PD FUZE (CA63) is a high explosive munition to give the warfighter live practice with the weapon system. Increase in quantity due to establishment of a new NSW requirement. (11) JAVELIN BLOCK 1 FGM148C (PMCI) is a man portable anti-tank/material missile. The Block 1 is the latest evolution in missile design. Increase due to requirement adjustments in order to reach fielded operational capabilities (FOC). LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 19 of 20 P-1 Line #11 Volume 1 - 151 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 2 / Naval Special Warfare FY Contractor and Location Method/Type or Funding Vehicle 2.1.6) CTG., 40MM PRACTICE, DAY/NIGHT MARKER MK281 (BA21) 2024 TBD / TBD MIPR ROCK ISLAND, IL Apr 2024 Oct 2025 39,469 32.00 N Dec 2023 Jul 2023 2.1.7) 40MM LV TP DAY/NIGHT/ THERMAL M781E1 (BA54) 2023 TBD / TBD MIPR ROCK ISLAND, IL Apr 2023 Oct 2024 16,544 17.06 N Jan 2023 Aug 2022 2.1.9) CTG, 60MM, M720A2 W/ M734, (BA44) 2022 ROCK ISLAND / ROCK ISLAND, IL MIPR ROCK ISLAND, IL Jan 2022 Jul 2023 6,148 549.98 Y 2.1.9) CTG, 60MM, M720A2 W/ M734, (BA44) 2024 TBD / TBD MIPR ROCK ISLAND, IL Apr 2024 Oct 2025 3,616 531.75 N 2.1.9) CTG, 60MM, M720A2 W/ M734, (BA44) 2027 ROCK ISLAND / ROCK ISLAND, IL MIPR ROCK ISLAND, IL Oct 2027 Apr 2028 3,544 564.30 Y Apr 2027 2.1.10) CTG, MORTAR 81MM HE M889 SERIES W/PD FUZE (CA63) 2019 DAY & ZIMMERMANN, INC. / PARSONS, KS C / CPFF PARSONS, KS Apr 2019 Apr 2021 1,443 623.68 Y Aug 2018 2.1.11) ROCKET, 66MM, LAAW, FFE, HEAT, M72A8 (HB25) 2020 NAMMO RAUFOSS / RAUFOSS, NORWAY C / CPFF RAUFOSS, NORWAY May 2020 Nov 2021 754 9,200.00 Y Jun 2019 JMC ROCK ISLAND / ROCK ISLAND, IL MIPR ROCK ISLAND, IL Apr 2022 Oct 2023 200 984.63 N 2019 DAY & ZIMMERMAN, INC. / PARSONS, KS C / CPFF PARSONS, KS Jul 2019 Jan 2021 2,175 1,011.80 Y Jul 2018 2022 RAYTHEON/LOCKHEED MARTIN JAVELIN JOINT VENTURE / TUCSON, AZ C / FFP REDSTONE, AL Aug 2022 Feb 2025 13 163,615.00 Y Jan 2021 2023 TBD / TBD C / FFP REDSTONE, AL May 2023 Nov 2025 8 197,864.00 N 2021 RAYTHEON/LOCKHEED MARTIN JAVELIN JOINT VENTURE / TUCSON, AZ C / FFP REDSTONE, AL May 2021 Nov 2023 1 498,876.00 Y 2.1.16) GUIDED MISSILE JAVELIN LIGHT WEIGHT (LCLU) 2023 TBD / TBD C / FFP REDSTONE, AL Apr 2023 Oct 2025 20 195,796.00 N Nov 2022 Jul 2022 2.1.16) GUIDED MISSILE JAVELIN LIGHT WEIGHT (LCLU) 2024 TBD / TBD C / FFP REDSTONE, AL Mar 2024 Sep 2026 10 246,637.00 N Oct 2023 May 2023 2.1.18) 81MM FRPC M879A1 (C875) 2019 DAY & ZIMMERMAN / PARSONS, KS C / FFP PARSON, KS Apr 2019 Nov 2022 1,287 217.56 Y Cost Elements 2.1.12) CTG 81MM ILLUM M853A1 W/FUZE TIME (C871) 2.1.13) CTG, 60MM HE MAPAM M1081 W/FUZE M734A1 (BA42) 2.1.14) JAVELIN BLOCK 1 FGM148F (PMC1) 2.1.14) JAVELIN BLOCK 1 FGM148F (PMC1) 2.1.16) GUIDED MISSILE JAVELIN LIGHT WEIGHT (LCLU) O O C P-1 Line Item Number / Title: 0270 / Other Ship Gun Ammunition 2022 (12) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Jul 2021 Dec 2023 Aug 2022 Dec 2022 Jul 2023 Dec 2021 Apr 2022 Aug 2020 Aug 2018 Footnotes: (12) FY 2022 procurement funded with Overseas Contingency Operations funding LI 0270 - Other Ship Gun Ammunition Navy UNCLASSIFIED Page 20 of 20 P-1 Line #11 Volume 1 - 152 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 743.597 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 743.597 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 743.597 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 96.038 47.775 48.801 0.000 48.801 51.063 51.905 52.787 53.842 - - - - - - - - - - - 96.038 47.775 48.801 0.000 48.801 51.063 51.905 52.787 53.842 - - - - - - - - - - - 96.038 47.775 48.801 0.000 48.801 51.063 51.905 52.787 53.842 - Total 1,145.808 1,145.808 1,145.808 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Program procures ammunition in support of Navy ships and for active and reserve ashore warfare forces. Small Arms (22 -.50 Cal) ammunition and Landing Party ammunition includes hand grenades, riot control agents and defensive land mines for the Military Sea Lift Command, Naval Criminal Investigate Service (NCIS), Marine and Navy Air-wings, Maritime Force Protection Command, and Naval Expeditionary Combat Command. Additionally, the Naval Special Warfare (NSW) small arms ammunition program includes (22 -.50 Cal) ammunition required for the organic weapon systems carried by US Navy SEALs, while the various hand grenades are employed for force protection, break contact maneuvers, ambushes, and target assaults. Secondary Distribution Navy Quantity Total Obligation Authority NR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 0335 - Small Arms & Lndg Party Ammo Navy FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 95.585 47.316 48.327 - 48.327 50.580 51.413 52.285 53.330 - - - - - - - - - 0.453 0.459 0.474 - 0.474 0.483 0.492 0.502 0.512 - - - - - - - - - 96.038 47.775 48.801 - 48.801 51.063 51.905 52.787 53.842 UNCLASSIFIED Page 1 of 35 P-1 Line #12 Volume 1 - 153 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Integrated Warfare Systems P-5a, P-21 - / 485.175 - / 78.135 - / 26.801 - / 26.822 - / 0.000 - / 26.822 P-5 2 / Naval Special Warfare (NSW) P-5a - / 258.422 - / 17.903 - / 20.974 - / 21.979 - / 0.000 - / 21.979 P-40 Total Gross/Weapon System Cost - / 743.597 - / 96.038 - / 47.775 - / 48.801 - / 0.000 - / 48.801 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding procures ammunition to support shotguns, handguns, rifles, machine guns, grenades and land mines. 12 Gauge, 5.56MM, 7.62MM, 9MM, 38 Caliber, 40 Caliber, 45 Caliber, 50 Caliber, Hand and Smoke Grenades, and Mines are used for all Active Navy Ships and all Active and Reserve Ashore warfare forces, including Navy Expeditionary Combat Command, Maritime Expeditionary Security Forces, Inshore Undersea Warfare Groups, Military Sea Lift Command, Marine and Navy Air-Wing units, and Naval Criminal Investigative Service. Baseline funding also provides production Engineering and Gauge requirements for Small Arms Ammunition, Grenades, and Mines. FY 2027 funding also procures Naval Special Warfare (NSW) ammunition to support shotguns, handguns, rifles, machine guns, and grenades tactically employed by US Navy SEALs, Special Boat Teams, NSW Task Units/Groups and other NSW support groups. Procurement in FY 2025 includes ammunition (22 - 50 Caliber) and Hand Grenades. Baseline program funds are also necessary for production engineering as required by DoD and Navy safety and acquisition regulations. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 2 of 35 P-1 Line #12 Volume 1 - 154 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 78.135 26.801 26.822 0.000 26.822 - Gross/Weapon System Cost ($ in Millions) 485.175 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 485.175 Plus CY Advance Procurement ($ in Millions) - - - - - 78.135 26.801 26.822 0.000 26.822 - Total Obligation Authority ($ in Millions) 485.175 FY 2027 Total - - - - - 78.135 26.801 26.822 0.000 26.822 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - (AH100) PE/QA SMCA Cost Recurring Cost 1.1.1) PE/QA SMCA - - 20.077 - - 1.592 - - 1.055 - - 0.937 - - 0.000 - - 0.937 Subtotal: Recurring Cost - - 20.077 - - 1.592 - - 1.055 - - 0.937 - - 0.000 - - 0.937 Subtotal: Hardware (AH100) PE/QA SMCA Cost - - 20.077 - - 1.592 - - 1.055 - - 0.937 - - 0.000 - - 0.937 Hardware - (AH100) TRANSPORTATION ACCOUNT CODE (TAC) Cost Recurring Cost 2.1.1) TRANSPORTATION ACCOUNT CODE (TAC) - - 15.574 - - 1.061 - - 1.082 - - 1.104 - - 0.000 - - 1.104 Subtotal: Recurring Cost - - 15.574 - - 1.061 - - 1.082 - - 1.104 - - 0.000 - - 1.104 - - 15.574 - - 1.061 - - 1.082 - - 1.104 - - 0.000 - - 1.104 Subtotal: Hardware - (AH100) TRANSPORTATION ACCOUNT CODE (TAC) Cost Hardware - (AH100) 50 CAL CARTRIDGES Cost Recurring Cost 3.1.1) .50 CAL BLANK (A598) (†) 3.1.2) CTG, .50 LINKED (A576) (†) 1.37 1,921,958 2.634 2.07 179,500 0.372 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.26 8,819,198 19.949 3.37 96,000 0.324 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 3 of 35 P-1 Line #12 Volume 1 - 155 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 3.1.3) CTG, 50 CAL, FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) (†) 2.01 19,060,740 38.346 - 3.1.4) CTG, 50 CAL, LKD & TRACER 2.07 56,989,572 118.162 3.14 4.21 823,582 3.469 5.33 LKD, BALL (A555) (A557) (†) (1) 3.1.5) CTG, 50 CAL., MK322 MOD1, RRA, (†) (2) LKD (AC14) Subtotal: Recurring Cost Subtotal: Hardware - (AH100) 50 CAL CARTRIDGES Cost FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.000 2.99 456,390 1.365 2.99 467,500 1.398 - - 0.000 2.99 467,500 1.398 3,452,500 10.841 3.20 3,387,700 10.841 3.26 3,028,000 9.871 - - 0.000 3.26 3,028,000 9.871 130,000 0.693 - - 0.000 5.44 43,200 0.235 - - 0.000 5.44 43,200 0.235 - - 182.560 - - 12.230 - - 12.206 - - 11.504 - - 0.000 - - 11.504 - - 182.560 - - 12.230 - - 12.206 - - 11.504 - - 0.000 - - 11.504 0.500 0.52 1.314 0.54 0.387 - - 0.000 0.54 0.000 - - 0.000 - 0.000 - - 0.000 - 0.653 - - 0.000 0.52 0.564 - - 0.000 0.52 Hardware - (AH100) 5.56MM CARTRIDGES Cost Recurring Cost 4.1.1) CTG, CAL 5.56MM, FRANGIBLE 0.43 33,827,694 14.587 0.52 0.25 91,703,532 22.620 - 0.44 8,379,406 3.692 0.50 1.11 1,891,200 2.106 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.84 115,200 0.097 0.77 64,800 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.83 117,000 0.097 0.77 64,800 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 BALL, M193 (A071) 0.36 1,344,000 0.482 0.41 865,000 0.355 0.42 599,760 0.252 0.43 0.258 - - 0.000 0.43 4.1.8) CTG., 5.56MM BALL, CARBINE, BARRIER, MK318 - - 0.000 - - 0.000 1.01 280,000 0.283 - - 0.000 - - 0.000 - - 0.000 - - 43.681 - - 1.608 - 1.849 - - 1.209 - - 0.000 - - 1.209 (†) (3) (AA40) 4.1.2) CTG, 5.56MM M855 (A059) 4.1.3) CTG., 5.56MM, BALL, M855A1 EPR (†) (4) (AB57) 4.1.4) CTG, 5.56MM, SRTA AMMO (†) (AB67) 4.1.5) CTG., 5.56MM, M1042, MARKING, BLUE (AC39) (†) (5) 4.1.6) CTG., 5.56MM, M1042, MARKING, RED (AC40) (†) (6) 961,200 1,305,000 2,526,000 716,000 1,085,000 716,000 1,085,000 0.387 0.000 0.564 4.1.7) CTG., 5.56MM, (†) (7) 599,760 599,760 0.258 (†) (AB49) Subtotal: Recurring Cost LI 0335 - Small Arms & Lndg Party Ammo Navy - UNCLASSIFIED Page 4 of 35 P-1 Line #12 Volume 1 - 156 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements Qty ($) Subtotal: Hardware - (AH100) 5.56MM CARTRIDGES Cost (Each) - FY 2025 Total Cost ($ M) - Unit Cost ($) 43.681 - FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 1.608 - 0.278 0.81 0.000 - FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 1.849 - 0.285 0.82 - 0.000 - - 0.000 2.40 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 1.209 - - 0.000 - - 1.209 0.289 - - 0.000 0.82 0.000 - - 0.000 - 100,320 0.241 - - 0.000 2.40 100,320 0.241 Hardware - (AH100) 7.62MM CARTRIDGES Cost Recurring Cost 5.1.1) CTG. 7.62MM (†) 0.54 5,267,510 2.870 0.76 5.1.2) CARTR, 7.62MM (AA11) 1.05 1,729,780 1.809 - 1.86 1,819,026 3.380 2.30 100,320 0.231 - 0.74 67,724,112 50.346 0.89 1,299,000 1.156 0.91 2,004,000 1.824 0.91 2,496,000 2.271 - - 0.000 0.91 2,496,000 2.271 0.63 14,958,614 9.479 0.85 1,003,000 0.853 0.88 1,544,000 1.359 0.89 992,000 0.883 - - 0.000 0.89 992,000 0.883 0.61 46,309,232 28.393 0.84 898,000 0.754 0.78 992,000 0.774 0.79 992,000 0.784 - - 0.000 0.79 992,000 0.784 (A257) 5.1.3) CTG, 7.62MM, SRTA, BALL, LINKED (†) M973 (AB60) 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) (†) (8) 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) (†) (9) 5.1.6) CTG, 7.62MM, LKD (A165) (†) (10) Subtotal: Recurring Cost Subtotal: Hardware - (AH100) 7.62MM CARTRIDGES Cost 366,000 - 352,000 352,000 - 352,000 - 0.289 0.000 - - 96.277 - - 3.272 - - 4.242 - - 4.468 - - 0.000 - - 4.468 - - 96.277 - - 3.272 - - 4.242 - - 4.468 - - 0.000 - - 4.468 2.520 - - 0.000 0.28 Hardware - (AH100) 9MM CARTRIDGES Cost Recurring Cost 6.1.1) CTG, 9MM, (†) (11) 0.18 107,231K 19.110 0.25 6,400,000 1.600 0.27 5,775,740 1.559 0.28 6.1.2) CTG., 9MM, BALL, XM1152 0.20 41,269,600 8.128 0.26 3,075,000 0.800 0.27 3,110,000 0.840 - - 0.000 - - 0.000 - - 0.000 0.20 162,000 0.032 - 0.000 - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) 0.28 21,638,985 6.161 0.26 2,500,000 0.650 0.28 0.799 0.29 0.699 - - 0.000 0.29 6.1.5) CTG, 9MM, FX, MARKING, BLUE 0.61 652,000 0.398 0.62 29,000 0.018 - 0.000 - 0.000 - - 0.000 - BALL (A363) (†) (AC20) 6.1.3) CTG., 9MM, SPECIAL, JHP, XM1153 (AC21) 6.1.4) CTG, 9MM, FRANGIBLE (AA16) (†) (AC36) LI 0335 - Small Arms & Lndg Party Ammo Navy - 2,853,000 - UNCLASSIFIED Page 5 of 35 9,000,000 2,410,000 - P-1 Line #12 9,000,000 2,410,000 - 2.520 0.699 0.000 Volume 1 - 157 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 6.1.6) CTG., 9MM, FX, MARKING, RED (†) (AC37) Unit Cost ($) 0.61 Subtotal: Recurring Cost FY 2025 Total Cost Qty (Each) ($ M) 2,852,500 Unit Cost ($) 1.730 0.61 FY 2026 Total Cost Qty (Each) ($ M) 249,000 Unit Cost ($) 0.152 0.78 FY 2027 Base Total Cost Qty (Each) ($ M) 200,000 Unit Cost ($) 0.156 0.63 FY 2027 OOC Total Cost Qty (Each) ($ M) 250,000 Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 0.158 - - 0.000 0.63 Total Cost Qty (Each) ($ M) 250,000 0.158 - - 35.559 - - 3.220 - - 3.354 - - 3.377 - - 0.000 - - 3.377 - - 35.559 - - 3.220 - - 3.354 - - 3.377 - - 0.000 - - 3.377 7.1.1) FUZE, DELAY M228 (G878) 5.89 27,486 0.162 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.2) GRENADE, VEHICLE LAUNCHED IR/S (GG42) 234.13 7,701 1.803 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.3) GRENADE, HND, SMK, GREEN (G940) 34.01 25,048 0.852 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.4) GRENADE, HND, SMK, VIOLET (G955) 58.20 10,000 0.582 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.5) GRENADE, HND, SMK, YELLOW (G945) 34.36 19,646 0.675 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.6) GRENADE, HND, SMK, WHITE (GG34) 30.52 25,000 0.763 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.1.7) GRENADE, HND, SMK, RED (G950) 52.16 10,352 0.540 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 242.00 2,000 0.484 - - 0.000 242.00 2,000 0.484 Subtotal: Recurring Cost - - 5.377 - - 0.000 - - 0.000 - - 0.484 - - 0.000 - - 0.484 Subtotal: Hardware (AH100) GRENADES Cost - - 5.377 - - 0.000 - - 0.000 - - 0.484 - - 0.000 - - 0.484 4.536 1.07 0.352 - - 0.000 1.11 0.474 - - 0.000 1.11 0.062 - 0.000 - - 0.000 - 0.000 - - 0.000 - Subtotal: Hardware - (AH100) 9MM CARTRIDGES Cost Hardware - (AH100) GRENADES Cost Recurring Cost 7.1.8) GRENADE, HAND, INCENDIARY AN-14 (G900) (†) (12) Hardware - (AH100) SHOTGUN CARTRIDGES Cost Recurring Cost 8.1.1) CTG, 12 GA NO. 00 (A011) (†) 8.1.2) CTG., 28 GAUGE SHOGUN, 0.60 - 7,524,840 - LI 0335 - Small Arms & Lndg Party Ammo Navy 329,000 - UNCLASSIFIED Page 6 of 35 427,000 - P-1 Line #12 427,000 - 0.474 0.000 Volume 1 - 158 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) TRAP/SKEET PAS (A046) Subtotal: Recurring Cost Subtotal: Hardware (AH100) SHOTGUN CARTRIDGES Cost - - 4.598 - - 0.352 - - 0.000 - - 0.474 - - 0.000 - - 0.474 - - 4.598 - - 0.352 - - 0.000 - - 0.474 - - 0.000 - - 0.474 1,000,000 2.800 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 500,000 3.800 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.37 22,004,160 8.222 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.63 3,780,800 2.379 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.09 2,760 0.003 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.39 2,880 0.004 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 299.94 10,152 3.045 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 54.27 30,000 1.628 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 84.79 8,256 0.700 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AHUKR) UKRAINE HARDWARE Cost Recurring Cost 9.1.1) CTG. .50 CAL M33/M17 4 BALL/1 TRACER (A557) (†) 2.80 9.1.2) CARTRIDGE,CALIBER .50,LINKED,17.60 API (AA06) (†) 9.1.3) CARTRIDGE, 5.56MM BALL, M855 (A059) (†) 9.1.4) CARTRIDGE 5.56MM BALL M855A1 AND TRACER M856A1, LINKED (AB73) (†) 9.1.5) CARTRIDGE, 7.62MM SPECIAL BALL M118 (A136) (†) 9.1.6) CARTRIDGE, .300 WIN MAG MATCH, MK 248 MOD 0 (A191) (†) 9.1.7) MINE, AP, M18A1, CLAYMORE W/NON-ELEC INITIATION SYSTEM (J007) (†) 9.1.8) GRENADE, HAND, FRAGMENTATION, M67 (G881) (†) 9.1.9) GRENADE, HAND, SMOKE LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 7 of 35 P-1 Line #12 Volume 1 - 159 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) VIOLET M18 SERIES (G995) (†) 9.1.10) CTG., 5.56MM, M1042, MARKING, RED 0.81 178,200 0.144 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.39 431,760 0.168 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.47 5,139,120 2.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.51 249,600 0.127 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.52 12,501,000 6.501 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.81 181,000 0.147 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (AC40) 9.1.11) CTG., 5.56MM, BALL, M193 (A071) (†) 9.1.12) CTG., 5.56MM, BALL, M855A1 EPR (†) (AB57) 9.1.13) CTG 5.56MM BALL LINKED (A062) (†) 9.1.14) CTG, CAL 5.56MM, FRANGIBLE (†) (AA40) 9.1.15) CTG., 5.56MM, M1042, MARKING, BLUE (†) (AC39) 9.1.16) TRANSPORTATION ACCOUNT CODE (TAC) - - 0.553 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 32.636 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 32.636 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AHUKR) UKRAINE HARDWARE Cost Hardware - (AH350) MATCH AMMO Cost Recurring Cost 10.1.1) CTG, .22 CAL, BALL, LR, MATCH (A091) 0.13 2,215,000 0.288 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10.1.2) CTG., 12 GA SHOTGUN (A002) 0.40 203,000 0.081 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10.1.3) CTG., 12 GAUGE SHOTGUN, TRAP/SKEET PAS (A003) 0.40 203,000 0.081 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 8 of 35 P-1 Line #12 Volume 1 - 160 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 10.1.4) CTG., 45 CAL, BALL, M1911, M (A483) Subtotal: Recurring Cost Subtotal: Hardware (AH350) MATCH AMMO Cost Unit Cost ($) 0.28 FY 2025 Total Cost Qty (Each) ($ M) 112,000 Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.031 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.481 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.481 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AH850) PRODUCT IMPROVEMENT Cost Recurring Cost 11.1.1) PRODUCT (13) - - 2.216 - - 0.277 - - 0.297 - - 0.305 - - 0.000 - - 0.305 Subtotal: Recurring Cost - - 2.216 - - 0.277 - - 0.297 - - 0.305 - - 0.000 - - 0.305 - - 2.216 - - 0.277 - - 0.297 - - 0.305 - - 0.000 - - 0.305 IMPROVEMENT Subtotal: Hardware (AH850) PRODUCT IMPROVEMENT Cost Hardware - (AH893) RENOVATION COMPONENTS Cost Recurring Cost 12.1.1) RENOVATION COMPONENTS - - 2.823 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.823 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.823 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AH893) RENOVATION COMPONENTS Cost Hardware - (AH894) GAUGE REQUIREMENTS Cost Recurring Cost 13.1.1) GAUGE REQUIREMENTS - - 0.273 - - 0.034 - - 0.020 - - 0.020 - - 0.000 - - 0.020 Subtotal: Recurring Cost - - 0.273 - - 0.034 - - 0.020 - - 0.020 - - 0.000 - - 0.020 - - 0.273 - - 0.034 - - 0.020 - - 0.020 - - 0.000 - - 0.020 Subtotal: Hardware - (AH894) GAUGE REQUIREMENTS Cost Hardware - (AH895) NON-STANDARD Cost Recurring Cost 14.1.1) NON- - - 3.927 - - 0.250 - - 0.000 - - 0.250 - - 0.000 - - 0.250 Subtotal: Recurring Cost - - 3.927 - - 0.250 - - 0.000 - - 0.250 - - 0.000 - - 0.250 Subtotal: Hardware (AH895) NON-STANDARD Cost - - 3.927 - - 0.250 - - 0.000 - - 0.250 - - 0.000 - - 0.250 STANDARD (14) LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 9 of 35 P-1 Line #12 Volume 1 - 161 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - (AHUKR) UKRAINE HARDWARE - TRANCHE 27 #1 Cost Recurring Cost 15.1.1) CTG, 50 CAL, LKD & TRACER (A557) (†) 15.1.2) CTG, 7.62MM, BALL, M80, LKD (A143) (†) 15.1.3) CTG, 7.62MM, LKD, BALL AND TR (A131) (†) 15.1.4) GRENADE, HND, SMK, RED (G950) (†) 15.1.5) CTG, 50 CAL, LKD, BALL (A555) (†) 15.1.6) CTG, CAL 5.56MM, FRANGIBLE (†) (AA40) 15.1.7) CTG, 12 GAUGE SLUG (A023) (†) 15.1.8) CTG, 5.56MM - - 0.000 2.89 2,000,000 5.780 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.77 3,000,000 2.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.80 24,530,000 19.624 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 92.63 10,813 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.73 2,259,800 6.169 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.51 5,576,000 2.844 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.40 50,000 0.070 - - 0.000 - - 0.000 - - 0.000 - - 0.000 228,480 - - 0.000 0.39 0.089 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 37.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AHUKR) UKRAINE HARDWARE - TRANCHE 27 #1 Cost - - 0.000 - - 37.888 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.539 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) M855 (A059) Hardware - (AHUKR) UKRAINE HARDWARE - TRANCHE 27 #2 Cost Recurring Cost 16.1.1) CTG, 50 CAL, LKD & TRACER - - 0.000 2.94 Subtotal: Recurring Cost - - 0.000 - - 4.539 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AHUKR) UKRAINE HARDWARE - TRANCHE 27 #2 Cost - - 0.000 - - 4.539 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (A557) (†) 1,544,000 Hardware - (AGUKR) UKRAINE HARDWARE - TRANCHE 28 Cost LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 10 of 35 P-1 Line #12 Volume 1 - 162 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Recurring Cost 17.1.1) CTG, 7.62MM, M80 BALL W/FLASH SUPPRESSED PROPELLANT - - 0.000 0.75 4,000,000 3.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.67 100,800 0.068 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 92.40 5,000 0.462 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 92.26 2,800 0.258 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 230.64 1,400 0.323 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 11.60 10,000 0.116 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.31 100,000 0.131 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.28 200,000 0.256 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.39 3,548,160 1.384 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 92.00 2,780 0.256 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 6.254 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AGUKR) UKRAINE HARDWARE - TRANCHE 28 Cost - - 0.000 - - 6.254 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (A143) (†) 17.1.2) CTG 7.62MM BALL M80 LINKED (A164) (†) 17.1.3) GRENADE, HND, SMK, GREEN (G940) (†) 17.1.4) GRENADE, HND, SMK, YELLOW (G945) (†) 17.1.5) GRENADE, HAND, INCENDIARY AN-14 (G900) (†) 17.1.6) CTG, 7.62MM (†) AP, M993 (AA03) 17.1.7) CTG, 7.62MM BALL, RIFLE, BARRIER, MK 319 MOD 0 (AB50) (†) 17.1.8) CTG, 7.62MM SPECIAL BALL, LONG RANGE, MK 316 MOD 0 (AB39) (†) 17.1.9) CTG, 5.56MM (†) M855 (A059) 17.1.10) GRENADE, HND, SMK, WHITE (GG34) (†) Hardware - TAIWAN REPLACEMENT - TRANCHE 2 Cost Recurring Cost LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 11 of 35 P-1 Line #12 Volume 1 - 163 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 18.1.1) GRENADE, HAND, INCENDIARY FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 230.64 3,155 0.728 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) - - 0.000 2.99 497,000 1.486 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 2.214 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware TAIWAN REPLACEMENT TRANCHE 2 Cost - - 0.000 - - 2.214 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.581 - - 0.000 - - 0.000 - - 0.000 - - 0.000 AN-14 (G900) (†) 18.1.2) CTG, 50 CAL, LKD, BALL (A555) Hardware - TAIWAN REPLACEMENT - TRANCHE 5 Cost Recurring Cost 19.1.1) CTG, 50 CAL, (†) - - 0.000 2.99 Subtotal: Recurring Cost - - 0.000 - - 0.581 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware TAIWAN REPLACEMENT TRANCHE 5 Cost - - 0.000 - - 0.581 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LKD, BALL (A555) 194,000 Support - (AH830) PRODUCTION ENGINEERING Cost 20.1) PRODUCTION ENGINEERING - - 36.221 - - 2.763 - - 2.696 - - 2.690 - - 0.000 - - 2.690 Subtotal: Support (AH830) PRODUCTION ENGINEERING Cost - - 36.221 - - 2.763 - - 2.696 - - 2.690 - - 0.000 - - 2.690 21.1) Prior Year Funding - - 2.833 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 21.2) CTG., 410 GAUGE SHOTGUN, TRAP/ SKEET PAS (A - - 0.062 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Prior Year Funding Cost - - 2.895 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 485.175 - - 78.135 - - 26.801 - - 26.822 - - 0.000 - - 26.822 Support - Prior Year Funding Cost Remarks: [Hardware] [P5 /(AH100)HARDWARE]: Provides for all types of components, load and assemble complete rounds and conduct acceptance tests. Provides for Transportation Account Code (TAC) first destination of delivery of production items and US Army Single Manager Conventional Ammunition (SMCA) related costs. [Hardware] [P5 / (AH850) PRODUCT IMPROVEMENT]: Provides engineering services and related effort by the producing contractor or manufacturing installation to extend the useful military life of an item or to improve the item within the current performance envelope. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 12 of 35 P-1 Line #12 Volume 1 - 164 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: [Hardware] [P5 / (AH894) GAUGE REQUIREMENTS]: Provides for procurement of gauges, auxiliary and test equipment and support costs necessary for ammunition metrology to check critical dimensions/parameters of ammunition items and their parts. This is to assure proper mating of parts and subassemblies, assure correct interfacing between the ammunition and guns, and proper ammunition performance. [Hardware] [P5 / (AH895) NON-STANDARD ITEMS]: Provides for non-standard items of ammunition. Includes training aids and initial procurements of required non type classified munition items including law enforcement ammunition for NCIS. [Hardware] AHUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 27, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] AHUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 27, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] AHUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 28, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] Supplemental funds provided in support of FY2025 Taiwan Replacement Transfer Tranche 2, Appropriations Act, 2024 (Division C of Public Law 118-50). [Hardware] Supplemental funds provided in support of FY2025 Taiwan Replacement Transfer Tranche 5, Appropriations Act, 2024 (Division C of Public Law 118-50). [Support Cost] AH830: Small Arms & Landing Party Ammunition Production Engineering provides for production engineering services to support new acquisition and in production ammunition. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) AH100: FY2025 through FY2027 quantities reduced due to funding reductions. AH100: FY2027 3.1.5 AC14 reduced procurement quantity to maintain inventory at adequate levels. AH100: FY2025 4.1.1 AA40 Update to reflect actuals. AH100: FY2025 4.1.3 AB57 Update to reflect actuals. AH100: FY2025 4.1.5 AC39 Update to reflect actuals. AH100: FY2025 4.1.6 AC40 Update to reflect actuals. AH100: FY2025 4.1.7 A071 Update to reflect actuals. AH100: FY2025 5.1.4 A131 reduced quantities due to pricing discrepancy. FY2026 reduced quantities due to funding decrease. AH100: FY2025 5.1.5 A143 Update to reflect actuals. (10) (11) (12) (13) AH100: FY2025 5.1.6 A165 Update to reflect actuals. Unit price decrease due to increase in Joint Service procurements. AH100: FY 2025 6.1.1 A363 Update to reflect actuals. Added procurement in FY 2027 to address inventory shortfall. Supports training requirements. AH100: FY2027 7.1.8 G900 added procurement to address inventory shortfall AH100: FY2026 11.1.1 Product Improvement Program (PIP) increase attributed to increased product improvement requirements to address legacy capabilities. Efforts include qualification and cataloging of replacement ammunition variants AA40, AC12, AC14, AC15, AC20, AC21, AC39, AC40, AB57 and Surface Danger Zone testing in support of safety reviews. (14) AH895: FY2026 14.1.1 NON - STANDARD deferred procurement due to sufficient inventory. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 13 of 35 P-1 Line #12 Volume 1 - 165 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Integrated Warfare Systems FY Contractor and Location Method/Type or Funding Vehicle 3.1.1) .50 CAL BLANK (A598) 2025 OLIN-WINCHESTER / LCAPP C / FFP JMC ROCK ISLAND Mar 2025 Aug 2027 179,500 2.07 Y Sep 2018 3.1.2) CTG, .50 LINKED (A576) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Jun 2024 96,000 3.23 Y Sep 2018 3.1.2) CTG, .50 LINKED (A576) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Jun 2025 110,200 2.77 Y Sep 2018 3.1.2) CTG, .50 LINKED (A576) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2025 Jun 2026 96,000 3.37 Y Sep 2018 3.1.3) CTG, 50 CAL, LKD, BALL (A555) 2022 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Aug 2022 Feb 2024 800,000 2.77 Y Sep 2018 3.1.3) CTG, 50 CAL, LKD, BALL (A555) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Sep 2024 499,200 2.82 Y Sep 2018 3.1.3) CTG, 50 CAL, LKD, BALL (A555) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Sep 2025 593,950 2.41 Y Sep 2018 3.1.3) CTG, 50 CAL, LKD, BALL (A555) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 456,390 2.99 Y Sep 2018 3.1.3) CTG, 50 CAL, LKD, BALL (A555) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 467,500 2.99 Y Sep 2018 2022 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Aug 2022 Aug 2023 2,322,972 2.96 Y Sep 2018 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 3,247,694 3.01 Y Sep 2018 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Nov 2023 Nov 2024 4,815,500 2.63 Y Sep 2018 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 3,452,500 3.14 Y Sep 2018 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 3,387,700 3.20 Y Sep 2018 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 3,028,000 3.26 Y Sep 2018 3.1.5) CTG, 50 CAL., MK322 MOD1, RRA, LKD (AC14) 2023 MARINE CORP / MARINE CORP INVENTORY MIPR MARCORSYSCOM May 2024 Jun 2024 153,600 4.33 Y Sep 2020 3.1.5) CTG, 50 CAL., MK322 MOD1, RRA, LKD (AC14) 2024 OCR Global / Mclean, VA MIPR MARCORSYSCOM Jun 2024 Mar 2025 153,600 4.41 Y Sep 2020 3.1.5) CTG, 50 CAL., MK322 MOD1, RRA, LKD (AC14) 2025 OCR Global / Mclean, VA C / FFP NSWC CRANE Mar 2025 Dec 2025 130,000 5.33 Y Sep 2021 3.1.5) CTG, 50 CAL., MK322 MOD1, RRA, LKD (AC14) 2027 OCR Global / Mclean, VA C / FFP NSWC CRANE Mar 2027 Mar 2028 43,200 5.44 Y Sep 2021 4.1.1) CTG, CAL 5.56MM, FRANGIBLE (AA40) 2025 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 961,200 0.52 Y Aug 2020 4.1.1) CTG, CAL 5.56MM, FRANGIBLE (AA40) 2026 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP JMC ROCK ISLAND Oct 2025 Oct 2026 2,526,000 0.52 Y Aug 2020 Cost Elements 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) 3.1.4) CTG, 50 CAL, LKD & (†) TRACER (A557) O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo LI 0335 - Small Arms & Lndg Party Ammo Navy Location of PCO Award Date Date of First Delivery (Each) UNCLASSIFIED Page 14 of 35 Qty P-1 Line #12 Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 166 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 4.1.1) CTG, CAL 5.56MM, FRANGIBLE (AA40) 2027 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP JMC ROCK ISLAND Oct 2026 Oct 2027 716,000 0.54 Y Aug 2020 4.1.3) CTG., 5.56MM, BALL, M855A1 EPR (AB57) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 2,057,446 0.47 Y Oct 2019 4.1.3) CTG., 5.56MM, BALL, M855A1 EPR (AB57) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Mar 2025 1,203,000 0.42 Y Oct 2019 4.1.3) CTG., 5.56MM, BALL, M855A1 EPR (AB57) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2025 Mar 2026 1,305,000 0.50 Y Oct 2020 4.1.3) CTG., 5.56MM, BALL, M855A1 EPR (AB57) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 1,085,000 0.52 Y Sep 2018 4.1.4) CTG, 5.56MM, SRTA AMMO (AB67) 2020 (15) GDOTS CANADA / CANADA SS / FFP JMC ROCK ISLAND Mar 2020 Oct 2023 504,000 0.99 Y Oct 2016 4.1.4) CTG, 5.56MM, SRTA AMMO (AB67) 2021 (16) GDOTS CANADA / CANADA SS / FFP JMC ROCK ISLAND Sep 2021 Nov 2023 462,600 1.09 Y Oct 2016 4.1.5) CTG., 5.56MM, M1042, MARKING, BLUE (AC39) 2023 UTM LTD. / UK C / FFP JMC ROCK ISLAND Jul 2023 Jul 2024 50,400 0.96 Y Jan 2022 4.1.5) CTG., 5.56MM, M1042, MARKING, BLUE (AC39) 2024 UTM LTD. / UK C / FFP JMC ROCK ISLAND Mar 2024 Apr 2026 64,800 0.75 Y Jan 2022 4.1.5) CTG., 5.56MM, M1042, MARKING, BLUE (AC39) 2025 UTM LTD. / UK C / FFP JMC ROCK ISLAND Mar 2025 Jan 2026 64,800 0.77 Y Jan 2022 4.1.6) CTG., 5.56MM, M1042, MARKING, RED (AC40) 2023 UTM LTD. / UK C / FFP JMC ROCK ISLAND Mar 2023 Dec 2023 50,400 0.96 Y Jan 2022 4.1.6) CTG., 5.56MM, M1042, MARKING, RED (AC40) 2024 UTM LTD. / UK C / FFP JMC ROCK ISLAND Mar 2024 Jan 2026 66,600 0.74 Y Jan 2022 4.1.6) CTG., 5.56MM, M1042, MARKING, RED (AC40) 2025 UTM LTD. / UK C / FFP JMC ROCK ISLAND Mar 2025 Jan 2027 64,800 0.77 Y Jan 2022 4.1.7) CTG., 5.56MM, BALL, M193 (A071) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 621,600 0.38 Y Sep 2018 4.1.7) CTG., 5.56MM, BALL, M193 (A071) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Mar 2025 722,400 0.34 Y Sep 2018 4.1.7) CTG., 5.56MM, BALL, M193 (A071) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2025 Mar 2026 865,000 0.41 Y Sep 2018 4.1.7) CTG., 5.56MM, BALL, M193 (A071) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 599,760 0.42 Y Sep 2018 4.1.7) CTG., 5.56MM, BALL, M193 (A071) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 599,760 0.43 Y Sep 2018 4.1.8) CTG., 5.56MM BALL, CARBINE, BARRIER, MK318 (AB49) 2026 TBD / TBD C / FFP TBD Apr 2026 Sep 2027 280,000 1.01 Y Mar 2025 5.1.1) CTG. 7.62MM (A257) 2022 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Aug 2022 Apr 2024 404,688 0.64 Y Oct 2018 LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 15 of 35 P-1 Line #12 Volume 1 - 167 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Integrated Warfare Systems FY Contractor and Location Method/Type or Funding Vehicle 5.1.1) CTG. 7.62MM (A257) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 May 2025 370,422 0.71 Y Oct 2018 5.1.1) CTG. 7.62MM (A257) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Mar 2026 384,900 0.70 Y Oct 2018 5.1.1) CTG. 7.62MM (A257) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2025 Mar 2027 366,000 0.76 Y Oct 2018 5.1.1) CTG. 7.62MM (A257) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 352,000 0.81 Y Sep 2018 5.1.1) CTG. 7.62MM (A257) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 352,000 0.82 Y Sep 2018 5.1.3) CTG, 7.62MM, SRTA, BALL, LINKED M973 (AB60) 2025 GDOTS CANADA / CANADA C / FFP PICATINNY ARSENAL Apr 2025 Sep 2025 100,320 2.30 Y Oct 2018 5.1.3) CTG, 7.62MM, SRTA, BALL, LINKED M973 (AB60) 2027 GDOTS CANADA / CANADA C / FFP PICATINNY ARSENAL Apr 2027 Sep 2027 100,320 2.40 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2022 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Aug 2022 Feb 2024 1,129,000 0.84 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Sep 2024 2,030,000 0.84 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Nov 2023 Mar 2025 2,008,000 0.76 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 1,299,000 0.89 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Sep 2027 2,004,000 0.91 Y Oct 2018 5.1.4) CTG, 7.62MM, LKD, BALL AND TR (A131) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Sep 2028 2,496,000 0.91 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2022 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Aug 2022 Mar 2024 598,000 0.81 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Oct 2024 607,200 0.83 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Oct 2025 691,200 0.74 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Sep 2025 Jun 2026 1,003,000 0.85 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Oct 2026 1,544,000 0.88 Y Oct 2018 5.1.5) CTG, 7.62MM, BALL, M80, LKD (A143) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Oct 2028 992,000 0.89 Y Oct 2018 5.1.6) CTG, 7.62MM, LKD (A165) 2023 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2023 Oct 2024 1,502,800 0.73 Y Oct 2018 5.1.6) CTG, 7.62MM, LKD (A165) 2024 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2024 Oct 2025 1,545,800 0.73 Y Oct 2018 5.1.6) CTG, 7.62MM, LKD (A165) 2025 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2025 Oct 2026 898,000 0.84 Y Oct 2018 5.1.6) CTG, 7.62MM, LKD (A165) 2026 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2026 Oct 2027 992,000 0.78 Y Oct 2018 5.1.6) CTG, 7.62MM, LKD (A165) 2027 OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Mar 2027 Oct 2028 992,000 0.79 Y Oct 2018 Cost Elements O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo LI 0335 - Small Arms & Lndg Party Ammo Navy Location of PCO Award Date Date of First Delivery (Each) UNCLASSIFIED Page 16 of 35 Qty P-1 Line #12 Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 168 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Integrated Warfare Systems FY Contractor and Location Method/Type or Funding Vehicle 6.1.1) CTG, 9MM, BALL (A363) 2025 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Mar 2025 Mar 2026 6,400,000 0.25 Y Mar 2021 6.1.1) CTG, 9MM, BALL (A363) 2026 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Oct 2026 Oct 2027 5,775,740 0.27 Y Mar 2021 6.1.1) CTG, 9MM, BALL (A363) 2027 OLIN-WINCHESTER / OXFORD, MS C / TBD JMC ROCK ISLAND Oct 2027 Oct 2028 9,000,000 0.28 Y Mar 2021 6.1.2) CTG., 9MM, BALL, XM1152 (AC20) 2023 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 6,207,600 0.26 Y Mar 2021 6.1.2) CTG., 9MM, BALL, XM1152 (AC20) 2024 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Mar 2024 Mar 2025 5,216,000 0.23 Y Mar 2021 6.1.2) CTG., 9MM, BALL, XM1152 (AC20) 2025 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Mar 2025 Mar 2026 3,075,000 0.26 Y Mar 2021 6.1.2) CTG., 9MM, BALL, XM1152 (AC20) 2026 OLIN-WINCHESTER / OXFORD, MS C / FFP JMC ROCK ISLAND Mar 2026 Nov 2026 3,110,000 0.27 Y Mar 2021 6.1.4) CTG, 9MM, FRANGIBLE (AA16) 2023 OLIN-WINCHESTER / OXFORD, MS C / FFP NSWC CRANE Mar 2023 Apr 2024 2,500,000 0.25 Y Jan 2019 6.1.4) CTG, 9MM, FRANGIBLE (AA16) 2024 OLIN-WINCHESTER / OXFORD, MS C / FFP NSWC CRANE Mar 2024 Apr 2025 1,786,000 0.28 Y Jan 2019 6.1.4) CTG, 9MM, FRANGIBLE (AA16) 2025 OLIN-WINCHESTER / OXFORD, MS C / FFP NSWC CRANE Mar 2025 Apr 2026 2,500,000 0.26 Y Jan 2019 6.1.4) CTG, 9MM, FRANGIBLE (AA16) 2026 OLIN-WINCHESTER / OXFORD, MS C / FFP NSWC CRANE Mar 2026 Apr 2027 2,853,000 0.28 Y Jan 2019 6.1.4) CTG, 9MM, FRANGIBLE (AA16) 2027 OLIN-WINCHESTER / OXFORD, MS C / FFP NSWC CRANE Mar 2027 Apr 2028 2,410,000 0.29 Y Jan 2019 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND May 2022 Aug 2024 24,000 0.72 Y Jan 2021 Cost Elements 6.1.5) CTG, 9MM, FX, MARKING, BLUE (AC36) O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo 2022 (17) Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 6.1.5) CTG, 9MM, FX, MARKING, BLUE (AC36) 2023 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 26,000 0.54 Y Jan 2021 6.1.5) CTG, 9MM, FX, MARKING, BLUE (AC36) 2024 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2024 Mar 2025 30,000 0.55 Y Jan 2021 6.1.5) CTG, 9MM, FX, MARKING, BLUE (AC36) 2025 GDOTS CANADA / CANADA C / TBD JMC ROCK ISLAND Mar 2025 Mar 2026 29,000 0.62 Y Jan 2021 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Aug 2022 Nov 2023 200,000 0.72 Y Jan 2021 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2022 (18) 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2023 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2023 Mar 2024 235,500 0.62 Y Jan 2021 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2024 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2024 Mar 2025 268,500 0.55 Y Jan 2021 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2025 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2025 Mar 2026 249,000 0.61 Y Jan 2021 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2026 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 200,000 0.78 Y Jan 2021 LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 17 of 35 P-1 Line #12 Volume 1 - 169 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 1 / Integrated Warfare Systems FY Contractor and Location Method/Type or Funding Vehicle 6.1.6) CTG., 9MM, FX, MARKING, RED (AC37) 2027 GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Mar 2027 Mar 2028 250,000 0.63 Y Jan 2021 7.1.8) GRENADE, HAND, INCENDIARY AN-14 (G900) 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR MIPR JMC ROCK ISLAND Mar 2027 Mar 2029 2,000 242.00 Y Mar 2026 2023 OLIN-WINCHESTER / ALTON, ILLINOIS. C / FFP JMC ROCK ISLAND Mar 2023 Dec 2023 529,200 0.82 Y Feb 2022 2024 OLIN-WINCHESTER / ALTON, ILLINOIS. C / FFP JMC ROCK ISLAND Mar 2024 Apr 2025 502,000 0.88 Y Feb 2022 2025 OLIN-WINCHESTER / ALTON, ILLINOIS. C / FFP JMC ROCK ISLAND Mar 2025 Apr 2026 329,000 1.07 Y Feb 2022 2027 OLIN-WINCHESTER / ALTON, ILLINOIS. C / FFP JMC ROCK ISLAND Mar 2027 Apr 2028 427,000 1.11 Y Feb 2022 Cost Elements O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo 8.1.1) CTG, 12 GA NO. 00 (A011) 8.1.1) CTG, 12 GA NO. 00 (A011) 8.1.1) CTG, 12 GA NO. 00 (A011) 8.1.1) CTG, 12 GA NO. 00 (A011) Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 9.1.1) CTG. .50 CAL M33/M17 4 BALL/1 TRACER (A557) 2023 (19) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 1,000,000 2.80 Y Sep 2018 9.1.2) CARTRIDGE,CALIBER .50,LINKED,1API (AA06) 2023 (20) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 500,000 7.60 Y Sep 2018 9.1.3) CARTRIDGE, 5.56MM BALL, M855 (A059) 2023 (21) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 9,000,160 0.35 Y Sep 2018 9.1.3) CARTRIDGE, 5.56MM BALL, M855 (A059) 2024 (22) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 13,004,000 0.39 Y Sep 2018 9.1.4) CARTRIDGE 5.56MM BALL M855A1 AND TRACER M856A1, LINKED (AB73) 2023 (23) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 2,200,000 0.60 Y Sep 2018 9.1.4) CARTRIDGE 5.56MM BALL M855A1 AND TRACER M856A1, LINKED (AB73) 2024 (24) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 1,580,800 0.67 Y Sep 2018 9.1.5) CARTRIDGE, 7.62MM SPECIAL BALL M118 (A136) 2023 (25) OLIN-WINCHESTER / LCAAP C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 2,760 0.94 Y Sep 2018 9.1.6) CARTRIDGE, .300 WIN MAG MATCH, MK 248 MOD 0 (A191) 2023 (26) N/A - Complete Stock Sale / Army C / FFP JMC ROCK ISLAND Sep 2024 Sep 2025 2,880 1.25 Y Nov 2023 9.1.7) MINE, AP, M18A1, CLAYMORE W/NON-ELEC INITIATION SYSTEM (J007) 2023 (27) ENERGETIC SYSTEMS, LLC / McEwen, TN C / FFP JMC ROCK ISLAND Jan 2024 Feb 2026 10,152 299.98 Y Nov 2023 9.1.8) GRENADE, HAND, FRAGMENTATION, M67 (G881) 2023 (28) DAY & ZIMMERMAN / Texarkana, TX C / FFP JMC ROCK ISLAND Jan 2024 Jan 2025 30,000 54.27 Y Nov 2023 9.1.9) GRENADE, HAND, SMOKE VIOLET M18 SERIES (G995) 2023 (29) PINE BLUFF ARSENAL / White Hall, AR MIPR JMC ROCK ISLAND Sep 2025 Aug 2028 8,256 84.76 Y Nov 2023 9.1.10) CTG., 5.56MM, M1042, MARKING, RED (AC40) 2024 (30) GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 178,200 0.81 Y Jan 2021 LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 18 of 35 P-1 Line #12 Volume 1 - 170 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C FY P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 9.1.11) CTG., 5.56MM, BALL, M193 (A071) 2024 (31) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 431,760 0.39 Y Sep 2018 9.1.12) CTG., 5.56MM, BALL, M855A1 EPR (AB57) 2024 (32) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 5,139,120 0.47 Y Sep 2018 9.1.13) CTG 5.56MM BALL LINKED (A062) 2024 (33) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 249,600 0.51 Y Sep 2018 9.1.14) CTG, CAL 5.56MM, FRANGIBLE (AA40) 2024 (34) VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 12,501,000 0.52 Y Aug 2020 9.1.15) CTG., 5.56MM, M1042, MARKING, BLUE (AC39) 2024 (35) GDOTS CANADA / CANADA C / FFP JMC ROCK ISLAND Jun 2025 Jun 2026 181,000 0.81 Y Jan 2021 15.1.1) CTG, 50 CAL, LKD & TRACER (A557) 2025 (36) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 2,000,000 2.89 Y Sep 2018 15.1.2) CTG, 7.62MM, BALL, M80, LKD (A143) 2025 (37) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 3,000,000 0.77 Y Sep 2018 15.1.3) CTG, 7.62MM, LKD, BALL AND TR (A131) 2025 (38) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 24,530,000 0.80 Y Sep 2018 15.1.4) GRENADE, HND, SMK, RED (G950) 2025 (39) PINE BLUFF ARSENAL / White Hall, AR MIPR JMC ROCK ISLAND Sep 2025 Aug 2028 10,813 92.63 Y Nov 2023 15.1.5) CTG, 50 CAL, LKD, BALL (A555) 2025 (40) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 2,259,800 2.73 Y Sep 2018 15.1.6) CTG, CAL 5.56MM, FRANGIBLE (AA40) 2025 (41) VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 5,576,000 0.51 Y Aug 2020 15.1.7) CTG, 12 GAUGE SLUG (A023) 2025 (42) REMINGTON ARMS / AR C / IDIQ NSWC CRANE Feb 2026 Feb 2027 50,000 1.40 Y Jul 2023 2025 (43) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 228,480 0.39 Y Sep 2018 16.1.1) CTG, 50 CAL, LKD & TRACER (A557) 2025 (44) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 1,544,000 2.94 Y Sep 2018 17.1.1) CTG, 7.62MM, M80 BALL W/FLASH SUPPRESSED PROPELLANT (A143) 2025 (45) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 4,000,000 0.75 Y Sep 2018 17.1.2) CTG 7.62MM BALL M80 LINKED (A164) 2025 (46) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 100,800 0.67 Y Sep 2018 17.1.3) GRENADE, HND, SMK, GREEN (G940) 2025 (47) PINE BLUFF ARSENAL / White Hall, AR C / FFP JMC ROCK ISLAND Sep 2025 Aug 2028 5,000 92.40 Y Nov 2023 17.1.4) GRENADE, HND, SMK, YELLOW (G945) 2025 (48) PINE BLUFF ARSENAL / White Hall, AR C / FFP JMC ROCK ISLAND Sep 2025 Aug 2028 2,800 92.26 Y Nov 2023 17.1.5) GRENADE, HAND, INCENDIARY AN-14 (G900) 2025 (49) Army / Army Inventory C / FFP NO PCO Sep 2025 Aug 2028 1,400 230.64 Y Nov 2023 15.1.8) CTG, 5.56MM M855 (A059) LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 19 of 35 P-1 Line #12 Volume 1 - 171 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 17.1.6) CTG, 7.62MM AP, M993 (AA03) 2025 (50) TBD / TBD C / FFP NSWC CRANE Feb 2026 Feb 2027 10,000 11.60 Y Sep 2025 17.1.7) CTG, 7.62MM BALL, RIFLE, BARRIER, MK 319 MOD 0 (AB50) 2025 (51) TBD / TBD C / FFP NSWC CRANE Feb 2026 Feb 2027 100,000 1.31 Y Sep 2025 17.1.8) CTG, 7.62MM SPECIAL BALL, LONG RANGE, MK 316 MOD 0 (AB39) 2025 (52) TBD / TBD C / FFP NSWC CRANE Feb 2026 Feb 2027 200,000 1.28 Y Sep 2025 2025 (53) OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Sep 2025 Sep 2026 3,548,160 0.39 Y Sep 2018 17.1.10) GRENADE, HND, SMK, WHITE (GG34) 2025 (54) TBD / TBD C / FFP NSWC CRANE Feb 2026 Feb 2027 2,780 92.00 Y Sep 2025 18.1.1) GRENADE, HAND, INCENDIARY AN-14 (G900) 2025 (55) Army / Army Inventory MIPR JMC ROCK ISLAND Sep 2025 Aug 2028 3,155 230.64 Y Nov 2023 17.1.9) CTG, 5.56MM M855 (A059) (†) FY P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo 18.1.2) CTG, 50 CAL, LKD, BALL (A555) 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Jun 2026 Jun 2027 497,000 2.99 Y Sep 2018 19.1.1) CTG, 50 CAL, LKD, BALL (A555) 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP JMC ROCK ISLAND Jun 2026 Jun 2027 194,000 2.99 Y Sep 2018 indicates the presence of a P-21 Footnotes: (15) Explosive incident at production plant in February 2021 resulted in plant shutdown and delayed deliveries. Production has restarted with an alternate primer manufacturer while GD-OTS waits for approval to restart from Canadian governmental authority following required facility upgrades. (16) Explosive incident at production plant in February 2021 resulted in plant shutdown and delayed deliveries. Production has restarted with an alternate primer manufacturer while GD-OTS waits for approval to restart from Canadian governmental authority following required facility upgrades. (17) Explosive incident at production plant in February 2021 resulted in plant shutdown and delayed deliveries. Production has restarted with an alternate primer manufacturer while GD-OTS waits for approval to restart from Canadian governmental authority following required facility upgrades. (18) Explosive incident at production plant in February 2021 resulted in plant shutdown and delayed deliveries. Production has restarted with an alternate primer manufacturer while GD-OTS waits for approval to restart from Canadian governmental authority following required facility upgrades. (19) (20) (21) (22) (23) (24) (25) (26) (27) Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 20 of 35 P-1 Line #12 Volume 1 - 172 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 (28) (29) (30) (31) (32) (33) (34) (35) (36) (37) (38) (39) (40) (41) (42) (43) (44) (45) (46) (47) (48) (49) (50) (51) (52) (53) (54) (55) P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Ukraine supplemental replenishment. Taiwan supplemental replenishment. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 21 of 35 P-1 Line #12 Volume 1 - 173 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT 3.1.4) CTG, 50 CAL, LKD & TRACER (A557) Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 46603406 1 2022 NAVY 2.323 .000 2.323 2.323 1 2023 NAVY 3.248 .000 3.248 3.248 1 2024 NAVY 4.816 .000 4.816 4.816 1 2025 NAVY 3.452 .000 3.452 3.452 1 2026 NAVY 3.388 .000 3.388 3.388 1 2027 NAVY 3.028 .000 3.028 3.028 O C T LI 0335 - Small Arms & Lndg Party Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 35 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 174 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 3.1.4) CTG, 50 CAL, LKD & TRACER (A557) Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 46603406 1 2022 NAVY 2.323 .000 2.323 1 2023 NAVY 3.248 .000 3.248 A - - - - - - - - - - - - 1.000 1.000 .323 A - - - - - - - 3.248 1 2024 NAVY 4.816 .000 4.816 4.816 1 2025 NAVY 3.452 .000 3.452 3.452 1 2026 NAVY 3.388 .000 3.388 3.388 1 2027 NAVY 3.028 .000 3.028 3.028 O C T LI 0335 - Small Arms & Lndg Party Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 35 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 175 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 3.1.4) CTG, 50 CAL, LKD & TRACER (A557) Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 46603406 1 2022 NAVY 2.323 2.000 .323 .323 1 2023 NAVY 3.248 .000 3.248 - 1 2024 NAVY 4.816 .000 4.816 1 2025 NAVY 3.452 .000 3.452 1 2026 NAVY 3.388 .000 3.388 1 2027 NAVY 3.028 .000 3.028 .000 - - - - 1.000 1.000 1.000 .248 A - - - - - - - - .000 - - - - 1.000 1.000 1.000 1.000 .816 .000 A - 3.452 3.388 3.028 O C T LI 0335 - Small Arms & Lndg Party Ammo Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 35 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 176 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 3.1.4) CTG, 50 CAL, LKD & TRACER (A557) Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 46603406 1 2022 NAVY 2.323 2.323 .000 .000 1 2023 NAVY 3.248 3.248 .000 .000 1 2024 NAVY 4.816 4.816 .000 1 2025 NAVY 3.452 .000 3.452 1 2026 NAVY 3.388 .000 3.388 1 2027 NAVY 3.028 .000 3.028 .000 - O C T LI 0335 - Small Arms & Lndg Party Ammo Navy - N O V - D E C - J A N - F E B - - - - - - 1.000 1.000 1.000 .452 A - - - - - - - - - - M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 35 S E P O C T N O V D E C .000 J A N F E B P-1 Line #12 1.000 1.000 1.000 .388 A - - - - M A R A P R M A Y J U N .000 J U L A U G - 3.028 S E P Volume 1 - 177 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 3.1.4) CTG, 50 CAL, LKD & TRACER (A557) Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 46603406 1 2022 NAVY 2.323 2.323 .000 .000 1 2023 NAVY 3.248 3.248 .000 .000 1 2024 NAVY 4.816 4.816 .000 .000 1 2025 NAVY 3.452 3.452 .000 .000 1 2026 NAVY 3.388 3.388 .000 1 2027 NAVY 3.028 .000 3.028 .000 O C T LI 0335 - Small Arms & Lndg Party Ammo Navy N O V D E C J A N F E B 1.000 1.000 1.000 .028 M A R A P R M A Y J U N .000 J U L A U G UNCLASSIFIED Page 26 of 35 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 178 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 6,000 10,000,000 1 OLIN-WINCHESTER LCAAP ALT Prior to Oct 1 ALT After Oct 1 4 Reorder Manufacturing PLT 4 18 Total After Oct 1 ALT Prior to Oct 1 22 ALT After Oct 1 4 Manufacturing PLT 4 Total After Oct 1 12 16 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 27 of 35 P-1 Line #12 Volume 1 - 179 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 17.903 20.974 21.979 0.000 21.979 - Gross/Weapon System Cost ($ in Millions) 258.422 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 258.422 Plus CY Advance Procurement ($ in Millions) - - - - - 17.903 20.974 21.979 0.000 21.979 - Total Obligation Authority ($ in Millions) 258.422 FY 2027 Total - - - - - 17.903 20.974 21.979 0.000 21.979 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - (AHNSW) GRENADES Cost Recurring Cost 1.1.1) GRENADE,HAND,SMOKE GREEN (G940) 61.97 14,992 0.929 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) GRENADE, 66MM SMOKE SCREENING (GG24) 235.00 2,000 0.470 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.3) FUZE, DELAY M228, F/M 68 HAND GRND (G878) 11.24 120,347 1.353 - - 0.000 - - 0.000 24.10 20,350 0.490 - - 0.000 24.10 20,350 0.490 1.1.4) GRENADE, VEHICLE LAUNCHED IR/S (GG42) 253.99 2,004 0.509 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) GRENADE, HAND, FRAG (G881) 40.26 17,760 0.715 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) GRENADE, HAND, SMOKE, YELLOW (G945) 52.31 25,692 1.344 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) GRENADE, HAND, SMOKE, RED (G950) 41.77 35,000 1.462 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 107.67 13,040 1.404 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 8.186 - - 0.000 - - 0.000 - - 0.490 - - 0.000 - - 0.490 1.1.8) GRENADE, HAND, SMOKE, (†) VIOLET (G955) Subtotal: Recurring Cost LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 28 of 35 P-1 Line #12 Volume 1 - 180 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware (AHNSW) GRENADES Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) - Unit Cost ($) 8.186 - FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 0.490 - - 0.000 - Total Cost Qty (Each) ($ M) - 0.490 Hardware - (AHNSW) 9MM CARTRIDGES Cost Recurring Cost 2.1.1) CTG, 9MM MMR, GREEN PRIMER (RED), 0.66 874,000 0.573 0.58 272,000 0.158 0.59 200,000 0.118 0.60 200,000 0.120 - - 0.000 0.60 200,000 0.120 0.64 1,066,000 0.683 0.58 272,000 0.158 0.59 200,000 0.118 0.60 200,000 0.120 - - 0.000 0.60 200,000 0.120 2.1.3) CTG, 9MM, MARKING, RED, M1041 (AB14) 0.59 5,634,440 3.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.4) CTG, 9MM MARKING, BLUE, M1041 (AB13) 0.59 5,578,300 3.312 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.5) CTG, 9MM BALL (A363) 0.18 84,405,673 14.869 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.39 5,914,000 2.308 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.20 20,448,000 4.003 0.20 0.524 0.21 0.761 0.21 1.260 - - 0.000 0.21 M1041 (AC37) (56) 2.1.2) CTG, 9MM, MMR,GREEN PRIMER (BLUE), M1041 (AC36) (†) (57) 2.1.6) CTG, 9MM REDUCED RICOCHETTE, LOW (†) PEN (AA16) 2.1.7) CTG 9MM BALL (†) (58) XM1152 (AC20) 2,620,000 3,623,810 6,000,000 6,000,000 1.260 2.1.8) CTG, 9MM MARKING, RED (AA12) - - 0.001 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.9) CTG, 9MM MARKING, BLUE (AA21) - - 0.001 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 29.083 - - 0.840 - - 0.997 - - 1.500 - - 0.000 - - 1.500 - - 29.083 - - 0.840 - - 0.997 - - 1.500 - - 0.000 - - 1.500 25.081 2.15 1.548 2.73 2.185 2.78 2.002 - - 0.000 2.78 Subtotal: Hardware - (AHNSW) 9MM CARTRIDGES Cost Hardware - (AHNSW) 7.62MM CARTRIDGES Cost Recurring Cost 3.1.1) CTG, 7.62MM SHORT RANGE (†) TRAINING (AA37) 1.61 15,621,442 720,000 800,400 720,000 720,000 2.002 (59) LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 29 of 35 P-1 Line #12 Volume 1 - 181 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.2) CTG, 7.62MM, M993 AP, W/M62 Std Tracer (AA36) 3.1.3) CTG, 7.62MM BLANK, LINKED (A111) (†) (60) 3.1.4) CTG, 7.62MM BALL LINKED (NO TRACER) (A143) (61) 3.1.5) CTG, 7.62MM LINKED 9:1 DIM TRACER F/MK 44 (A257) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) 0.53 880,500 0.463 - 0.50 33,965,015 16.840 0.62 0.71 1,248,800 0.888 - 0.53 13,319,368 7.062 FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 1.922 0.63 - 0.000 - - - 0.000 0.78 0.001 - - 0.000 - 3,100,000 FY 2027 Base Total Cost Qty (Each) ($ M) - 3,100,000 - 1,000,500 Unit Cost ($) 0.000 - 1.953 0.64 0.000 - 0.780 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.000 - - 0.000 - 2.007 - - 0.000 0.64 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.000 - - 0.000 - - 0.000 - - 0.000 2.010 0.91 2.730 - - 0.000 0.91 3,136,000 - 3,136,000 0.000 2.007 (†) (62) 3.1.6) CTG, 7.62MM BALL (SOST) (AB50) 3.1.7) CTG, 7.62MM LNKD, BALL AND TRACER (A131) (†) (63) 3.1.8) CTG 7.62MM 4AP/1TR, LINKED (†) (64) XM1158 (AC09) Subtotal: Recurring Cost Subtotal: Hardware - (AHNSW) 7.62MM CARTRIDGES Cost - - - 0.63 58,577,239 36.830 0.81 3,000,000 2.417 0.67 3,000,000 3,000,000 3,000,000 2.730 14.30 67,642 0.967 17.50 100,000 1.750 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 88.132 - - 7.637 - - 6.928 - - 6.739 - - 0.000 - - 6.739 - - 88.132 - - 7.637 - - 6.928 - - 6.739 - - 0.000 - - 6.739 Hardware - (AHNSW) 5.56MM CARTRIDGES Cost Recurring Cost 4.1.1) CTG, 5.56MM JACKETED FRANGIBLE MK (AA40) 0.43 2,372,991 1.028 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.2) CTG, 5.56MM BALL, CARBINE, BARRIER, MK (AB49) 0.34 1,616,760 0.554 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.3) CTG, 5.56MM CTG BALL B855 LKD F/SAW (A062) 0.35 920,000 0.326 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.37 16,113,680 6.039 0.40 0.767 0.41 0.513 0.41 1.167 - - 0.000 0.41 0.38 4,800,800 1.810 - 0.000 - 0.000 - 0.000 - - 0.000 - 4.1.4) CTG 5.56MM BALL (A071) (†) 4.1.5) CTG, 5.56MM, LINKED (A075) LI 0335 - Small Arms & Lndg Party Ammo Navy 1,918,000 - 1,251,000 - UNCLASSIFIED Page 30 of 35 2,845,659 - P-1 Line #12 2,845,659 - 1.167 0.000 Volume 1 - 182 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 4.1.6) CTG, 5.56MM BLANK (TRAINING ITEM) (A080) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) 0.22 12,015,130 2.636 - - 0.000 - 0.78 6,142,676 4.790 - - 0.000 0.91 0.45 8,808,000 3.969 - - 0.000 - 1.24 2,483,689 3.078 - - 0.000 1.40 0.46 1,295,200 0.601 - - 0.000 - 4.1.11) CTG 5.56MM SHORT RANGE TRAINING AMMO (AC10) 1.67 521,600 0.873 - - 0.000 4.1.12) CTG 5.56MM TRACER M856A1 (AB74) 0.79 100,040 0.079 - - Subtotal: Recurring Cost - - 25.783 - - - 25.783 - 4.1.7) CTG, 5.56MM 77 GRAIN, MK 262 MOD 0/1, LONG FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.000 0.27 1,500,000 0.405 - - 0.000 0.27 1,500,000 0.405 0.670 0.93 273,880 0.255 - - 0.000 0.93 273,880 0.255 0.000 - - 0.000 - - 0.000 - - 0.000 0.564 - - 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 0.767 - - 1.747 - - 1.827 - - 0.000 - - 1.827 - 0.767 - - 1.747 - - 1.827 - - 0.000 - - 1.827 2.900 5.92 4.144 5.98 4.186 - - 0.000 5.98 736,360 (†) (AA53) 4.1.8) CTG, 5.56MM LINKED (A064) 4.1.9) CTG, 5.56MM SHORT RANGE (†) TRAINING (AB67) 4.1.10) CTG 5.56MM BALL LFS M855A1 (†) (AB57) Subtotal: Hardware - (AHNSW) 5.56MM CARTRIDGES Cost 403,200 Hardware - (AHNSW) .50 CAL CARTRIDGES Cost Recurring Cost 5.1.1) CTG. 50 CAL, LINKED BALL MK 322 MOD 1/TRAC 5.58 1,925,000 10.742 5.80 500,000 700,000 700,000 700,000 4.186 5.1.2) CTG, 50 CAL, LINKED, BALL MK 322/TRACER MK (AB64) 4.62 2,694,400 12.458 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.3) CTG, CAL .50 LINKED BALL (NO TRACER) (A555) 2.14 2,940,318 6.280 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.92 3,944,259 7.562 3.06 0.306 3.12 0.936 3.19 0.319 - - 0.000 3.19 (†) (65) (AC15) 5.1.4) CTG, CAL .50 LINKED, BALL/ TRACER (A557) (†) (66) LI 0335 - Small Arms & Lndg Party Ammo Navy 100,000 300,000 UNCLASSIFIED Page 31 of 35 100,000 P-1 Line #12 100,000 0.319 Volume 1 - 183 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 5.1.5) CTG, CAL .50 APL MK 211 MIULTI PURPOSE (A606) 5.1.6) CTG, CAL .50 LINKED, M8 API/M20 (†) (67) API-T (A576) 5.1.7) CTG, CAL .50 LINKED, BLANK, (†) (68) M1A1 (A598) Subtotal: Recurring Cost Subtotal: Hardware - (AHNSW) .50 CAL CARTRIDGES Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) 14.55 50,160 0.730 - 2.16 12,108,372 26.194 3.29 1.48 12,818,950 18.941 2.02 FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 300,000 0.987 3.36 800,000 1.616 2.06 FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 500,000 1.680 3.43 800,000 1.648 2.10 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.000 - - 0.000 - - 0.000 717,784 2.462 - - 0.000 3.43 717,784 2.462 800,000 1.680 - - 0.000 2.10 800,000 1.680 - - 82.907 - - 5.809 - - 8.408 - - 8.647 - - 0.000 - - 8.647 - - 82.907 - - 5.809 - - 8.408 - - 8.647 - - 0.000 - - 8.647 Hardware - (AHNSW) MATCH AMMO Cost Recurring Cost 6.1.1) CTG, CAL .300 MATCH (A191) 1.22 864,363 1.054 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1.2) CTG, CAL 45 MATCH (A483) 0.34 200,000 0.068 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1.3) CTG .300 PRC HORNADY 225 GR ELD-M(TB15) 2.00 50,000 0.100 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1.222 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (AHNSW) MATCH AMMO Cost - - 1.222 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - (AHNSW) TRANSPORTATION ACCOUNT CODE (TAC) Cost Recurring Cost 7.1.1) TRANSPORTATION ACCOUNT CODE (TAC) - - 5.992 - - 0.741 - - 0.739 - - 0.771 - - 0.000 - - 0.771 Subtotal: Recurring Cost - - 5.992 - - 0.741 - - 0.739 - - 0.771 - - 0.000 - - 0.771 - - 5.992 - - 0.741 - - 0.739 - - 0.771 - - 0.000 - - 0.771 9.571 - - 0.720 - - 0.740 - - 0.559 - - 0.000 - - 0.559 Subtotal: Hardware - (AHNSW) TRANSPORTATION ACCOUNT CODE (TAC) Cost Support - (NS830) PRODUCTION ENGINEERING Cost 8.1) Production Engineering - - LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 32 of 35 P-1 Line #12 Volume 1 - 184 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) (69) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 7.546 - - 1.389 - - 1.415 - - 1.446 - - 0.000 - - 1.446 Subtotal: Support (NS830) PRODUCTION ENGINEERING Cost - - 17.117 - - 2.109 - - 2.155 - - 2.005 - - 0.000 - - 2.005 Gross/Weapon System Cost - - 258.422 - - 17.903 - - 20.974 - - 21.979 - - 0.000 - - 21.979 8.2) (AHNSW) SMCA (†) indicates the presence of a P-5a Footnotes: (56) (57) (58) (59) AC37 9MM Procuring CTGs, 9MM, FX, M1041 Marking cartridges BLUE (AB36) and RED (AB37) instead of BLUE (AB13) and RED (AB14) to reduce personnel exposure to Lead during training. AC36 9MM Procuring CTGs, 9MM, FX, M1041 Marking cartridges BLUE (AB36) and RED (AB37) instead of BLUE (AB13) and RED (AB14) to reduce personnel exposure to Lead during training. Procuring CTG., 9MM, BALL, XM1152 (AC20) replaced CTG, 9MM, BALL (A363) to maintain commonality with US Army and USMC. AA37, 7.62mm Short Range Training Ammunition is procured through the SMCA. The contract is matrix priced and unit cost will vary based on the total quantity procured by all the services, and FMS customers. Pricing provided by SMCA. (60) A111 Ammunition is manufactured at Lake City Army Ammunition Plant. Recent award of facility contract to new operator resulted in unit cost increases in FY 2022-FY 2031. This item is a primary training configuration for use with 7.62mm machine guns and required to maintain readiness. Pricing provided by SMCA (61) A143, 7.62mm Ball, linked ammunition is manufactured at Lake City Army Ammunition Plant. This item is required for 7.62mm machine gun training in areas with high fire danger, contains no tracers. Pricing provided by SMCA. (62) (63) (64) A257, 7.62mm linked ammunition is manufactured at Lake City Army Ammunition Plant. This is the primary combat configuration for the MK 44 machine gun, mini gun type. Pricing provided by SMCA. A131 Ammunition is manufactured at Lake City Army Ammunition Plant. This item is a primary combat and training configuration for the 7.62mm machine guns (other than the MK44). AC09 This item is procured via an Army contract that procures ammunition for multiple services. This contract utilizes matrix pricing; therefore, the unit cost is dependent on quantity procured by all services, resulting in variation from programed unit costs dependent on quantities of orders received at time of execution. This item is more capable AP configuration, which will replace older AP cartridges. (65) AC15 Procuring CTG, .CAL 50, REDUCED RANGE AMMUNITIOIN, MK 321 MOD 1/MK 322 MOD 1 (AC15) instead of CTG, .50 CAL, REDUCED RANGE AMMUNITIOIN, MK 321 MOD 0/MK 322 MOD 0 (AB64), to maintain commonality with the USMC. Current inventory is less than half a years requirement. This configuration is used in tactical mobility training and is required due to training range surface danger zone limitations. This item is required to meet readiness standards. (66) (67) (68) (69) A557 Ammunition is manufactured at Lake City Army Ammunition Plant. A576 Ammunition is manufactured at Lake City Army Ammunition Plant. A598 Ammunition is manufactured at Lake City Army Ammunition Plant. Single Manager for Convention Ammunition (SMCA) Engineering Support of Items in Production (ESIP) provides for civilian personnel salaries, materiel costs and travel/per diem of civilian and military personnel performing production engineering activities directly associated with product procurement related to end items including components/parts. ESIP costs will vary year to year with the complexity of the items procured, amounts of undelivered quantity, and the amount of problems encountered by the vendors. LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 33 of 35 P-1 Line #12 Volume 1 - 185 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 1.1.8) GRENADE, HAND, SMOKE, VIOLET (G955) 2022 PINE BLUFF ARSENAL / White Hall, AR C / FFP White Hall, AR Mar 2022 Sep 2023 13,040 107.69 Y Aug 2021 2.1.2) CTG, 9MM, MMR,GREEN PRIMER (BLUE), M1041 (AC36) 2022 JMC ROCK ISLAND / ROCK ISLAND, IL C / FFP JMC ROCK ISLAND Mar 2022 Mar 2022 200,000 0.74 Y Dec 2021 2.1.2) CTG, 9MM, MMR,GREEN PRIMER (BLUE), M1041 (AC36) 2023 JMC ROCK ISLAND / ROCK ISLAND, IL TBD JMC ROCK ISLAND Apr 2023 Apr 2023 208,000 0.56 N Dec 2022 May 2022 2.1.2) CTG, 9MM, MMR,GREEN PRIMER (BLUE), M1041 (AC36) 2024 JMC ROCK ISLAND / ROCK ISLAND, IL TBD JMC ROCK ISLAND Mar 2024 Mar 2024 208,000 0.56 N Oct 2023 May 2023 2.1.6) CTG, 9MM REDUCED RICOCHETTE, LOW PEN (AA16) 2022 OLIN CORP / ILLINOIS C / FFP EAST ALTON, IL Apr 2022 Aug 2023 1,000,000 0.30 Y 2.1.6) CTG, 9MM REDUCED RICOCHETTE, LOW PEN (AA16) 2023 OLIN CORP / ILLINOIS TBD EAST ALTON, IL Apr 2023 Aug 2024 826,000 0.55 N Jan 2023 Oct 2022 2.1.6) CTG, 9MM REDUCED RICOCHETTE, LOW PEN (AA16) 2024 OLIN CORP / ILLINOIS C / TBD EAST ALTON, IL Apr 2024 Aug 2025 1,000,000 0.56 N Jan 2024 Oct 2023 2.1.7) CTG 9MM BALL XM1152 (AC20) 2022 SIG SAUER / EXETER, NH C / FFP NEWINGTON, N.H Apr 2022 Apr 2023 8,198,000 0.19 Y 2.1.7) CTG 9MM BALL XM1152 (AC20) 2023 SIG SAUER / EXETER, NH C / TBD NEWINGTON, N.H Apr 2023 Apr 2024 6,000,000 0.20 N Dec 2022 Oct 2022 2.1.7) CTG 9MM BALL XM1152 (AC20) 2024 SIG SAUER / EXETER, NH C / TBD NEWINGTON, N.H Apr 2024 Apr 2025 6,000,000 0.20 N Dec 2023 Oct 2023 3.1.1) CTG, 7.62MM SHORT RANGE TRAINING (AA37) 2023 GDOTS CANADA / CANADA C / FFP JMC ROCK Oct 2022 May 2023 800,400 2.38 N May 2023 Oct 2022 3.1.3) CTG, 7.62MM BLANK, LINKED (A111) 2022 ATK Lake City Army Ammunition Plant / Lake City C / FFP JMC ROCK ISLAND May 2022 May 2022 3,100,000 0.59 Y 3.1.3) CTG, 7.62MM BLANK, LINKED (A111) 2023 ALLIANT TECH DBA (LCAAP) / INDEPENDENCE, MO C / TBD JMC ROCK ISLAND Apr 2023 Nov 2023 3,100,000 0.59 N Nov 2022 Sep 2022 3.1.3) CTG, 7.62MM BLANK, LINKED (A111) 2024 ALLIANT TECH DBA (LCAAP) / INDEPENDENCE, MO C / TBD JMC ROCK ISLAND Apr 2024 Nov 2024 3,100,000 0.60 N Oct 2023 Aug 2023 2016 TBD / TBD C / TBD ** NO PCO ** Oct 2015 Apr 2017 522,727 0.44 N Aug 2016 3.1.5) CTG, 7.62MM LINKED 9:1 DIM TRACER F/MK 44 (A257) 2023 TBD / TBD C / TBD ROCK ISLAND, IL Apr 2023 Apr 2024 1,000,500 0.74 N Oct 2023 3.1.7) CTG, 7.62MM LNKD, BALL AND TRACER (A131) 2022 ALLIANT TECH DBA (LCAAP) / INDEPENDENCE, MO C / FFP EAST ALTON, IL May 2022 May 2023 2,947,200 0.84 Y 3.1.7) CTG, 7.62MM LNKD, BALL AND TRACER (A131) 2023 ALLIANT TECH DBA (LCAAP) / INDEPENDENCE, MO C / TBD EAST ALTON, IL Apr 2023 Apr 2024 1,000,000 0.84 N Dec 2022 Aug 2022 3.1.7) CTG, 7.62MM LNKD, BALL AND TRACER (A131) 2024 ALLIANT TECH DBA (LCAAP) / INDEPENDENCE, MO C / TBD EAST ALTON, IL May 2024 May 2025 3,000,000 0.86 N Jan 2023 Jul 2023 3.1.8) CTG 7.62MM 4AP/1TR, LINKED XM1158 (AC09) 2023 TBD / TBD C / TBD TBD Apr 2023 Oct 2024 67,642 14.30 N Dec 2022 Aug 2022 3.1.5) CTG, 7.62MM LINKED 9:1 DIM TRACER F/MK 44 (A257) ✓ LI 0335 - Small Arms & Lndg Party Ammo Navy UNCLASSIFIED Page 34 of 35 (Each) P-1 Line #12 Nov 2021 Oct 2021 Oct 2021 Oct 2022 Jul 2021 Volume 1 - 186 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 2 / Naval Special Warfare (NSW) FY Contractor and Location Method/Type or Funding Vehicle 4.1.4) CTG 5.56MM BALL (A071) 2022 ATK LAKE CITY / LAKE CITY C / FFP JMC ROCK ISLAND Apr 2022 Apr 2023 1,584,240 0.38 Y 4.1.4) CTG 5.56MM BALL (A071) 2023 ATK LAKE CITY / LAKE CITY TBD JMC ROCK ISLAND Apr 2023 Apr 2024 5,001,360 0.38 N Nov 2022 Jul 2022 4.1.4) CTG 5.56MM BALL (A071) 2024 ATK LAKE CITY / LAKE CITY C / TBD JMC ROCK ISLAND May 2024 May 2025 4,100,000 0.39 N Dec 2023 Aug 2023 4.1.7) CTG, 5.56MM 77 GRAIN, MK 262 MOD 0/1, LONG (AA53) 2022 BLACK HILLS AMMUNITION / RAPID CITY, SD C / FFP RAPID CITY, SD Apr 2022 Oct 2023 1,500,600 0.85 Y 4.1.7) CTG, 5.56MM 77 GRAIN, MK 262 MOD 0/1, LONG (AA53) 2024 BLACK HILLS AMMUNITION / RAPID CITY, SD C / TBD RAPID CITY, SD May 2024 Nov 2025 736,360 0.88 N 4.1.9) CTG, 5.56MM SHORT RANGE TRAINING (AB67) 2022 GENERAL DYNAMICS CANADA / CANADA C / FFP ROCK ISLAND, IL May 2022 Nov 2023 90,000 1.27 Y 4.1.9) CTG, 5.56MM SHORT RANGE TRAINING (AB67) 2024 GENERAL DYNAMICS CANADA / CANADA C / TBD ROCK ISLAND, IL Apr 2024 Oct 2025 403,200 1.34 N Dec 2023 Aug 2023 4.1.10) CTG 5.56MM BALL LFS M855A1 (AB57) 2023 TBD / TBD C / TBD JMC ROCK ISLAND May 2023 Nov 2024 394,720 0.48 N Dec 2022 Oct 2022 4.1.10) CTG 5.56MM BALL LFS M855A1 (AB57) 2024 TBD / TBD C / TBD JMC ROCK ISLAND Apr 2024 Oct 2025 409,920 0.47 N Nov 2023 Jul 2023 5.1.1) CTG. 50 CAL, LINKED BALL MK 322 MOD 1/TRAC (AC15) 2023 TBD / TBD C / TBD JMC ROCK ISLAND Apr 2023 Oct 2024 700,000 5.61 N Oct 2022 Jun 2022 5.1.1) CTG. 50 CAL, LINKED BALL MK 322 MOD 1/TRAC (AC15) 2024 TBD / TBD C / TBD JMC ROCK ISLAND Apr 2024 Oct 2025 625,000 5.72 N Oct 2023 May 2023 5.1.4) CTG, CAL .50 LINKED, BALL/TRACER (A557) 2022 ATK LAKE CITY / LAKE CITY C / FFP Independence, MO Apr 2022 Apr 2023 109,600 2.95 Y Oct 2021 5.1.6) CTG, CAL .50 LINKED, M8 API/M20 API-T (A576) 2022 OLIN WINCHESTER / EAST ALTON, IL C / FFP JMC ROCK ISLAND Apr 2022 Apr 2023 216,400 3.18 Y Jun 2021 5.1.6) CTG, CAL .50 LINKED, M8 API/M20 API-T (A576) 2024 TBD / TBD C / TBD JMC ROCK ISLAND May 2024 May 2025 300,000 3.23 N 5.1.7) CTG, CAL .50 LINKED, BLANK, M1A1 (A598) 2022 ATK LAKE CITY / LAKE CITY C / FFP JMC ROCK ISLAND Jul 2022 Feb 2023 702,600 1.94 Y 5.1.7) CTG, CAL .50 LINKED, BLANK, M1A1 (A598) 2023 ATK LAKE CITY / LAKE CITY C / TBD JMC ROCK ISLAND Jun 2023 Jan 2024 800,000 1.94 N Oct 2022 Jul 2022 5.1.7) CTG, CAL .50 LINKED, BLANK, M1A1 (A598) 2024 ATK LAKE CITY / LAKE CITY C / TBD JMC ROCK ISLAND May 2024 Dec 2024 800,000 1.97 N Dec 2023 Jun 2023 Cost Elements O O C P-1 Line Item Number / Title: 0335 / Small Arms & Lndg Party Ammo LI 0335 - Small Arms & Lndg Party Ammo Navy Location of PCO Award Date Date of First Delivery (Each) UNCLASSIFIED Page 35 of 35 Qty P-1 Line #12 Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date May 2021 May 2021 Oct 2023 Feb 2023 Jun 2021 Jan 2024 Sep 2023 Aug 2021 Volume 1 - 187 === page 216 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 188 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 172.229 172.229 172.229 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 15.072 9.293 9.510 0.000 9.510 9.989 10.189 10.404 10.612 - - - - - - - - - - - 15.072 9.293 9.510 0.000 9.510 9.989 10.189 10.404 10.612 - - - - - - - - - - - 15.072 9.293 9.510 0.000 9.510 9.989 10.189 10.404 10.612 - Total 247.298 247.298 247.298 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Pyrotechnics and demolition materials consists of smoke and flare signals for safety of life, simulators, remote and time delay firing devices, safe and arming devices, demolition charges, blasting caps, detonating cord, time fuze, cable cutters, Improvised Explosive Device (IED) disrupters, cartridge actuated devices, shape charges, and shock test charges. These materials are used by all Navy platforms and Navy Mobile Construction Battalions, mobile diving and salvage units, cargo handling and port groups, naval security groups, fleet composite operational readiness groups, and Explosive Ordnance Disposal (EOD) groups, mobile units, detachments, and teams. The program procures pyrotechnics and demolition materials for all active naval vessels, construction battalions, mobile diving and salvage units, cargo handling and port groups, naval security groups, and explosive ordnance disposal groups/mobile units/detachments/teams. Pyrotechnics are used for training, combat exercises, submarine rescue and personnel search, and rescue operations. These items consist of illumination, signaling, identification, and location devices using flares or smoke as the primary signaling agent. Demolitions consist of explosive devices and accessories and are required for fleet units to perform training functions and operations/requirements. Fleet requirements are based upon CNO approved allowance lists or for special needs on a case by case basis and worldwide fleet expenditures. This program also provides materials to support the ship shock test program. Naval Special Warfare pyrotechnics and demolition materials consists of smoke and flare signals for safety of life, combat effects simulators, remote and time delay firing devices, safe and arming devices, blasting machines, demolition charges, blasting caps, detonating cord, time fuse, cable cutters, cartridge actuated devices, shape charges, and shock tube type detonators. The demolition materials are used by the Naval Special Warfare Center for initial demolition training and qualification, by SEAL platoons for constructing breaching charges, for construction of obstacles or barriers, clearance of obstacles or barriers, cable cutting, coral and channel clearance, material and equipment destruction, diversions, combat effects simulation charges, improvised incendiary charges, and defensive anti-vehicle and anti-personnel charges. Pyrotechnics are used by Naval Special Warfare for emergency or distress signaling, combat effects simulation, target marking, de-confliction, escalation of force warning, and distraction. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 1 of 20 P-1 Line #13 Volume 1 - 189 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Integrated Warfare Systems P-5a - / 152.551 - / 13.260 - / 7.602 - / 7.737 - / 0.000 - / 7.737 P-5 2 / Naval Special Warfare P-5a - / 19.678 - / 1.813 - / 1.691 - / 1.773 - / 0.000 - / 1.773 P-40 Total Gross/Weapon System Cost - / 172.229 - / 15.072 - / 9.293 - / 9.510 - / 0.000 - / 9.510 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 baseline funding procures pyrotechnics to support surface, air, ground, and underwater Navy requirements for training, combat exercises, submarine rescue, personnel search and rescue operations, and demolition consisting of explosive devices and accessories to support fleet units performing training and operational exercises. Baseline funding also provides Product Improvement Programs to resolve obsolescence issues in demolition items, emergency signaling devices and submarine signals. Baseline program funds renovation of radio firing devices, remote timing device battery replacement, supply components for demolition items, and Production Engineering and Gauge requirements for pyrotechnics and demolition materials. FY 2027 baseline funding procures pyrotechnics, demolition devices and accessories to support Naval Special Warfare (NSW) requirements for initial qualification, pre-deployment, and sustainment training, combat exercises, and testing by US Navy SEALs, Special Boat Teams, NSW Task Units/Groups and other NSW support groups. Baseline program funds are also necessary for production engineering as required by DoD and Navy safety and acquisition regulations. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 2 of 20 P-1 Line #13 Volume 1 - 190 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 13.260 7.602 7.737 0.000 7.737 - Gross/Weapon System Cost ($ in Millions) 152.551 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 152.551 Plus CY Advance Procurement ($ in Millions) - - - - - 13.260 7.602 7.737 0.000 7.737 - Total Obligation Authority ($ in Millions) 152.551 FY 2027 Total - - - - - 13.260 7.602 7.737 0.000 7.737 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - AJ100 HARDWARE Cost Recurring Cost 1.1.1) TRANSPORTATION ACCOUNT CODE (N97) - - 0.298 - - 0.016 - - 0.015 - - 0.014 - - 0.000 - - 0.014 1.1.2) TRANSPORTATION ACCOUNT CODE (N96) - - 1.992 - - 0.122 - - 0.088 - - 0.116 - - 0.000 - - 0.116 1.1.3) TRANSPORTATION ACCOUNT CODE (N95) - - 0.189 - - 0.014 - - 0.013 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.479 - - 0.152 - - 0.116 - - 0.130 - - 0.000 - - 0.130 Subtotal: Hardware - AJ100 HARDWARE Cost - - 2.479 - - 0.152 - - 0.116 - - 0.130 - - 0.000 - - 0.130 Hardware - AJ100 PE/QA SMCA Cost Recurring Cost 2.1.1) PE/QA SMCA - - 5.033 - - 0.222 - - 0.175 - - 0.184 - - 0.000 - - 0.184 Subtotal: Recurring Cost - - 5.033 - - 0.222 - - 0.175 - - 0.184 - - 0.000 - - 0.184 Subtotal: Hardware - AJ100 PE/QA SMCA Cost - - 5.033 - - 0.222 - - 0.175 - - 0.184 - - 0.000 - - 0.184 Hardware - AJ100 CUTTERS & CARTRIDGES Cost Recurring Cost LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 3 of 20 P-1 Line #13 Volume 1 - 191 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost 3.1.1) CTG, 50 CAL BLANK, ELEC, MK20 ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 188.48 41,510 7.824 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.2) CUTTER, MK33, NONELECTRIC IN (SS43) 997.27 1,100 1.097 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.4) CARTRIDGE, IMPULSE, MK 192 MOD 0 (MD54) 118.79 4,470 0.531 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 9.452 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AJ100 CUTTERS & CARTRIDGES Cost - - 9.452 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (SS01) Hardware - AJ100 DET CORDS, CAPS & FUZES Cost Recurring Cost 4.1.1) CAP, BLASTING, ELEC, INERT (MP16) 24.78 27,120 0.672 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.54 1,289,800 0.696 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 45.58 143,940 6.561 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.4) SQUIB, ELECTRIC, MK 20 MOD 2 (MP40) 72.47 67,134 4.865 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.5) CAP, BLASTIN, NON-ELEC, INERT (M097) 25.43 48,400 1.231 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.74 3,994,692 2.976 1.18 0.354 1.31 0.507 - - 0.000 - - 0.000 - - 0.000 41.75 12,696 0.530 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 50.21 8,007 0.402 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.2) LEAD,PYROTECHNIC,MK (†) 34 MOD 0 (DWEI) 4.1.3) CAP, BLASTING, ELECTRIC MK 18 (†) MOD 0 (DWHH) 4.1.6) CORD, DETONATING, PRIMACORD 300,000 387,000 (†) (1) (M456) 4.1.7) DETONATOR, DEL, 17MS, MK 158 (DWEL) (†) 4.1.8) DETONATOR, DEL, 25MS, MK 160 MOD 0, 12FT (†) (DWEN) LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 4 of 20 P-1 Line #13 Volume 1 - 192 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 4.1.9) DETONATOR, NON-ELEC, MK 121 (MP17) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 348.66 8,002 2.790 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 740.63 1,600 1.185 - - 0.000 768.04 875 0.672 - - 0.000 - - 0.000 - - 0.000 4.1.11) FUZE, BLASTING, TIME (M670) 0.49 1,356,000 0.665 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.12) IGNITIER, TIME BLASTING FUZE (MN08) 5.35 43,956 0.235 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 22.808 - - 0.354 - - 1.179 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AJ100 DET CORDS, CAPS & FUZES Cost - - 22.808 - - 0.354 - - 1.179 - - 0.000 - - 0.000 - - 0.000 355 1.187 - - 0.000 - - 0.000 - - 0.000 4.1.10) EOD REFILL KIT-LMNS (DWGJ) (2) Hardware - MINE CHARGES & CHARGE CUTTERS Cost Recurring Cost 5.1.1) CHG KIT, DML, 1,649.37 2,159 3.561 - - 0.000 25.05 138,870 3.479 44.08 15,780 0.696 - - 0.000 - - 0.000 - - 0.000 - - 0.000 69.95 10,894 0.762 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 29.62 20,495 0.607 54.90 7,000 0.384 - - 0.000 - - 0.000 - - 0.000 - - 0.000 14.89 23,712 0.353 23.71 10,719 0.254 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.8) CUTTER, POWDER ACTUATED MK 23/1 (MN70) 333.33 1,842 0.614 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.9) VALVE, EXPLOSIVE ELECTRIC, MK 2 MOD 1 (MW02) 465.70 9,214 4.291 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.10) CUTTER, POWDER ACTUATED MK 24/1 (MN71) 992.00 1,250 1.240 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.11) CHG, DEML, MK149 MOD0 LOW 75.43 11,030 0.832 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (3) MK 75 (MW84) 5.1.2) CHG, DML, BLK, COMP C-4, 1.25 (†) (M023) 5.1.3) CHG, DML, XPL ROLL, 11FT (M985) 5.1.4) CHG, DML, XPL ROLL, 25 FT (†) (M981) 5.1.5) CHG, DML, XPL ROLL, 38 FT, 14 (†) (M980) LI 0340 - Pyrotechnic and Demolition Navy 3,342.41 UNCLASSIFIED Page 5 of 20 P-1 Line #13 Volume 1 - 193 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) HAZ FLEX LIN SHP (MM54) 5.1.12) Chg, Demo, Mk 145 Low Hazard Flex (MM53) 63.50 20,440 1.298 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10.28 60,192 0.619 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.14) MK147 BATTERY (CWBD) 271.43 140 0.038 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.15) CHG, DEML, MK144 MOD 0 LOW HAZ FLEX (MM52) 45.48 16,800 0.764 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 48.57 5,040 0.245 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 18.458 - - 1.334 - - 1.432 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - MINE CHARGES & CHARGE CUTTERS Cost - - 18.458 - - 1.334 - - 1.432 - - 0.000 - - 0.000 - - 0.000 2,107.03 1,280 2.697 185 1.290 428 1.314 - - 0.000 - - 0.000 - - 0.000 4,546.02 1,130 5.137 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3,669.57 1,147 4.209 - - 0.000 - - 0.000 168 1.044 - - 0.000 168 1.044 6.1.5) CTG, IMPULSE, MK148 (M663) 4,360.00 100 0.436 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1.6) EXPLOSIVE BOLT CARTRIDGE (MC91) 3,320.00 150 0.498 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1.7) SWITCH, SQUIB ACTUATED, MK112 (M853) 803.28 122 0.098 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.13) CHARGE, DEMO SHEET, FLEXIBLE, 0.043 (†) THICK (M994) 5.1.16) CONTAINER, DML CHG, MK-1 (†) (M474) Hardware - AJ100 N97 UNDERSEA WARFARE Cost Recurring Cost 6.1.1) SIG, SMK ILLUM, MAR, MK 141, (†) GREEN (LA26) 6.1.2) SIG, SMK ILLUM, MAR, MK 144/118, YELLOW 6,972.97 3,071.03 (†) (LA27) 6.1.3) MARKER, LOCATION, SUB, MK (†) 140, RED (LA28) LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 6 of 20 6,213.54 P-1 Line #13 6,213.54 Volume 1 - 194 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 6.1.8) CTG, IMPULSE, MK 235 (MW97) Subtotal: Recurring Cost Subtotal: Hardware AJ100 N97 UNDERSEA WARFARE Cost Qty (Each) 3,850.00 FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 100 0.385 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 13.460 - - 1.290 - - 1.314 - - 1.044 - - 0.000 - - 1.044 - - 13.460 - - 1.290 - - 1.314 - - 1.044 - - 0.000 - - 1.044 2,631 4.410 395 1.074 - - 0.000 500 1.415 - - 0.000 500 1.415 Hardware - AJ100 SHOCK TEST CHARGES Cost Recurring Cost 7.1.1) CHARGE, SHOCK TEST, 60 LB (†) (XW65) 1,676.17 2,719.32 2,829.18 2,829.18 Subtotal: Recurring Cost - - 4.410 - - 1.074 - - 0.000 - - 1.415 - - 0.000 - - 1.415 Subtotal: Hardware - AJ100 SHOCK TEST CHARGES Cost - - 4.410 - - 1.074 - - 0.000 - - 1.415 - - 0.000 - - 1.415 Hardware - AJ100 SIGNALS Cost Recurring Cost 8.1.1) SIGNAL ILLUMINATION, MK80/2 RED STAR 12.86 112,189 1.443 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 100.65 74,966 7.545 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 166.30 2,273 0.378 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 81.64 11,294 0.922 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 65.92 8,250 0.544 - - 0.000 65.92 8,250 0.544 - - 0.000 - - 0.000 - - 0.000 65.92 8,250 0.544 - - 0.000 65.92 8,250 0.544 Subtotal: Recurring Cost - - 10.288 - - 0.000 - - 0.000 - - 1.088 - - 0.000 - - 1.088 Subtotal: Hardware - AJ100 SIGNALS Cost - - 10.288 - - 0.000 - - 0.000 - - 1.088 - - 0.000 - - 1.088 (4) (L258) 8.1.2) SIG, SMK ILLUM, MAR, MK 124/1, DISTRESS (†) (LA60) 8.1.3) SIG KIT MK (†) 189, MOD 0 (L564) 8.1.4) SIGNAL KIT, PERS DISTRESS, (†) MK79 (L118) 8.1.5) SIGNAL, SMK, GROUND, M129A1, (†) RED PARA (L323) 8.1.6) SIGNAL, SMK, GROUND, M128A1, GREEN (†) PARA (L324) LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 7 of 20 P-1 Line #13 Volume 1 - 195 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - TRAINING DEVICES Cost Recurring Cost 9.1.1) SIM, HAND GRENADE, M116 (L601) 15.53 46,350 0.720 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 26.81 22,798 0.611 - - 0.000 26.81 22,798 0.611 Subtotal: Recurring Cost - - 0.720 - - 0.000 - - 0.000 - - 0.611 - - 0.000 - - 0.611 Subtotal: Hardware TRAINING DEVICES Cost - - 0.720 - - 0.000 - - 0.000 - - 0.611 - - 0.000 - - 0.611 37.06 3,400 0.126 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 41.07 560 0.023 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 40.67 2,016 0.082 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 55.85 14,520 0.811 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 82.71 1,064 0.088 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.20 136,000 0.163 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 9.1.2) SIM, PROJ, GROUND BURST (L594) (†) Hardware - (AJUKR) UKRAINE HARDWARE Cost Recurring Cost 10.1.1) CAP, BLASTING, M7, NONELECTRIC, NONPROPAGATING PACK (M131) (†) 10.1.2) CAP, BLASTING, M6, ELECTRIC, NONPROPAGATING PACK (M130) (†) 10.1.3) CHARGE, DEMOLITION, BLOCK,1-LB, TNT (M032) 10.1.4) CHARGE, DEMOLITION, M112, BLOCK, WITH TAGGANT (M023) (†) 10.1.5) CHARGE, DEMOLITION, EXPLOSIVE SHEET (†) (M980) 10.1.6) CORD, DETONATING, REINFORCED, PLIOFILM, PETN (†) (M456) LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 8 of 20 P-1 Line #13 Volume 1 - 196 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 10.1.7) FUSE, BLASTING, TIME, (†) M700 (M670) 10.1.8) M81, IGNITER M81 IGNITER, TIME BLASTING FUSE (MN08) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 1.48 50,000 0.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 8.33 720 0.006 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2,111.03 1,450 3.061 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) 10.1.9) DEMO KIT, BANGALORE TORPEDO M1A2E1 2 (†) 1/2 FT (MP03) 10.1.10) TRANSPORTATION ACCOUNT CODE - - 0.021 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 4.455 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 4.455 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 7.542 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 4.504 - - 0.298 - - 0.278 - - 0.276 - - 0.000 - - 0.276 - - 12.046 - - 0.298 - - 0.278 - - 0.276 - - 0.000 - - 0.276 - - 12.046 - - 0.298 - - 0.278 - - 0.276 - - 0.000 - - 0.276 Subtotal: Hardware (AJUKR) UKRAINE HARDWARE Cost Hardware - (AJ850) PRODUCT IMPROVEMENT Cost Recurring Cost 11.1.1) PRODUCT IMPROVEMENT (N96) Surface Warfare 11.1.2) PRODUCT IMPROVEMENT (N97) Undersea Warfare (5) Subtotal: Recurring Cost Subtotal: Hardware (AJ850) PRODUCT IMPROVEMENT Cost Hardware - (AJ893) RENOVATION COMPONENTS Cost Recurring Cost 12.1.1) RENOVATION COMPONENTS - - 3.886 - - 0.290 - - 0.248 - - 0.107 - - 0.000 - - 0.107 Subtotal: Recurring Cost - - 3.886 - - 0.290 - - 0.248 - - 0.107 - - 0.000 - - 0.107 - - 3.886 - - 0.290 - - 0.248 - - 0.107 - - 0.000 - - 0.107 Subtotal: Hardware (AJ893) RENOVATION COMPONENTS Cost Hardware - (AJ894) GAUGE REQUIREMENTS Cost Recurring Cost LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 9 of 20 P-1 Line #13 Volume 1 - 197 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 13.1.1) GAUGE REQUIREMENTS - - 0.144 - - 0.005 - - 0.005 - - 0.005 - - 0.000 - - 0.005 Subtotal: Recurring Cost - - 0.144 - - 0.005 - - 0.005 - - 0.005 - - 0.000 - - 0.005 - - 0.144 - - 0.005 - - 0.005 - - 0.005 - - 0.000 - - 0.005 Subtotal: Hardware - (AJ894) GAUGE REQUIREMENTS Cost Hardware - (AJ895) NON-STANDARD Cost Recurring Cost 14.1.1) NONSTANDARD - - 1.957 - - 0.095 - - 0.089 - - 0.125 - - 0.000 - - 0.125 Subtotal: Recurring Cost - - 1.957 - - 0.095 - - 0.089 - - 0.125 - - 0.000 - - 0.125 Subtotal: Hardware (AJ895) NON-STANDARD Cost - - 1.957 - - 0.095 - - 0.089 - - 0.125 - - 0.000 - - 0.125 Hardware - (AJ00079) ISRAEL REPLACEMENT FUNDS Cost Non Recurring Cost 15.1.1) DETONATOR, NON-ELEC, MK 121 (MP17) - - 0.311 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 0.311 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.311 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - (AJ00079) ISRAEL REPLACEMENT FUNDS Cost Hardware - (AJUKR) UKRAINE REPLACEMENT (TRANCHE 27) Cost Recurring Cost 16.1.1) CHARGE, DEMOLITION, M112, BLOCK, WITH TAGGANT (M023) - - 0.000 37.71 81,510 3.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 3.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 3.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.296 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) Subtotal: Recurring Cost Subtotal: Hardware (AJUKR) UKRAINE REPLACEMENT (TRANCHE 27) Cost Hardware - (AJUKR) UKRAINE REPLACEMENT (TRANCHE 28) Cost Recurring Cost 17.1.1) LEAD,PYROTECHNIC,M (†) 34 MOD 0 (DWEI) - - LI 0340 - Pyrotechnic and Demolition Navy 0.000 0.54 4,251,244 UNCLASSIFIED Page 10 of 20 P-1 Line #13 Volume 1 - 198 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Recurring Cost Subtotal: Hardware (AJUKR) UKRAINE REPLACEMENT (TRANCHE 28) Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 - - 2.296 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.296 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - (AJ830) PRODUCTION ENGINEERING Cost 18.1) PRODUCTION ENGINEERING (N95) Expeditionary Warfare - - 0.381 - - 0.022 - - 0.023 - - 0.021 - - 0.000 - - 0.021 18.2) PRODUCTION ENGINEERING (N96) Surface Warfare - - 31.750 - - 1.973 - - 1.966 - - 1.954 - - 0.000 - - 1.954 18.3) PRODUCTION ENGINEERING (N97) Undersea Warfare - - 10.513 - - 0.781 - - 0.777 - - 0.777 - - 0.000 - - 0.777 Subtotal: Support (AJ830) PRODUCTION ENGINEERING Cost - - 42.644 - - 2.776 - - 2.766 - - 2.752 - - 0.000 - - 2.752 Gross/Weapon System Cost - - 152.551 - - 13.260 - - 7.602 - - 7.737 - - 0.000 - - 7.737 Remarks: [Hardware] AJ100: HARDWARE - Procures all up rounds and conduct acceptance tests. Costs associated with Transportation Account Code (TAC) are for first destination of delivery of production items. Unit costs and quantities will be adjusted during the year of execution. [Hardware] AJ850: PRODUCT IMPROVEMENT - Provides engineering services and related efforts by government activities, the producing contractor or manufacturing installation to extend the useful military life of an item or to improve the item within the current performance envelope. [Hardware] AJ893: RENOVATION COMPONENTS - The items purchased with funds identified for renovation components will be used to upgrade unserviceable rounds to ready-for-issue condition. The rounds to be renovated will be those with the lowest asset readiness positions. [Hardware] AJ894: GAUGE REQUIREMENTS - Procure the gauges and test equipments necessary to check critical dimensions/parameters of ammunition items and their parts. This is to assure proper mating of parts and sub-assemblies, assure correct interfacing between the ammunition and guns, and proper ammunition performance. [Hardware] AJ895: NON-STANDARD - The non-standard line is to support procurement of ammunition training aids and initial procurements of required non-type classified munition items. [Hardware] AJUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 27, Appropriations Act, 2024 (Division B of Public Law 118-50). [Hardware] AJUKR: Supplemental funds provided in support of FY2025 Ukraine Replacement Transfer Tranche 28, Appropriations Act, 2024 (Division B of Public Law 118-50). [Support Cost] AJ830: PRODUCTION ENGINEERING - Provides for production engineering services to support new acquisition and in production ammunition. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 11 of 20 P-1 Line #13 Volume 1 - 199 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 1 / Integrated Warfare Systems MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) 4.1.6: (M456) Realigned FY26 funds from L258 procurement to support an order for M456. AJ100: 4.1.10 DWGJ procurement shifted to FY2026 to bring priority procurement forward. 5.1.1: FY26 MW84 Unit cost and quantities adjusted for actuals. 8.1.1: (L258) FY2026 procurements cancelled due to higher priority requirements. FY 2027 Product Improvement Program addresses submarine signal obsolescence and manufacturability to decrease manufacturing time and complexity. This will be proven out through qualification and safety testing certifying the safety and reliability of the design for Navy fielding. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 12 of 20 P-1 Line #13 Volume 1 - 200 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 3.1.1) CTG, 50 CAL BLANK, ELEC, MK20 (SS01) 2021 CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND MIPR NO PCO Mar 2021 Sep 2023 5,000 189.93 Y Oct 2018 3.1.1) CTG, 50 CAL BLANK, ELEC, MK20 (SS01) 2022 CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND MIPR NO PCO Mar 2022 Sep 2024 4,200 193.54 Y Aug 2021 4.1.2) LEAD,PYROTECHNIC,MK 34 MOD 0 (DWEI) 2024 ENSIGN BICKFORD 2 / SIMSBURY, CT C / FFP NSWC CRANE Sep 2024 Oct 2025 1,289,800 0.54 Y Oct 2023 4.1.3) CAP, BLASTING, ELECTRIC MK 18 MOD 0 (DWHH) 2022 STRESAU LABS / SPOONER, WI. C / FFP NSWC CRANE Mar 2022 Mar 2024 13,500 53.13 Y Mar 2021 4.1.3) CAP, BLASTING, ELECTRIC MK 18 MOD 0 (DWHH) 2023 STRESAU LABS / SPOONER, WI. C / FFP NSWC CRANE Apr 2023 Apr 2025 9,570 64.23 Y Mar 2022 4.1.3) CAP, BLASTING, ELECTRIC MK 18 MOD 0 (DWHH) 2024 STRESAU LABS / SPOONER, WI. C / FFP NSWC CRANE Mar 2024 Mar 2025 7,920 75.11 Y Mar 2022 4.1.6) CORD, DETONATING, PRIMACORD (M456) 2023 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND May 2023 Jun 2025 187,692 1.30 Y Mar 2022 4.1.6) CORD, DETONATING, PRIMACORD (M456) 2025 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Mar 2025 Aug 2026 300,000 1.18 Y Aug 2024 4.1.6) CORD, DETONATING, PRIMACORD (M456) 2026 ENSIGN BICKFORD / SIMSBURY, CT C / TBD JMC ROCK ISLAND Oct 2025 Jun 2026 387,000 1.31 Y Oct 2025 4.1.7) DETONATOR, DEL, 17MS, MK 158 (DWEL) 2021 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Aug 2022 Feb 2024 5,856 50.20 Y Jan 2021 4.1.8) DETONATOR, DEL, 25MS, MK 160 MOD 0, 12FT (DWEN) 2021 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Aug 2022 Feb 2024 8,007 50.20 Y Jan 2021 5.1.1) CHG KIT, DML, MK 75 (MW84) 2026 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Mar 2026 Mar 2027 355 3,342.41 Y Aug 2025 5.1.2) CHG, DML, BLK, COMP C-4, 1.25 (M023) 2025 AMERICAN ORDANCE / Middletown, IA C / FFP JMC ROCK ISLAND Mar 2025 Mar 2027 15,780 44.08 Y Aug 2024 5.1.4) CHG, DML, XPL ROLL, 25 FT (M981) 2025 (8) ENSIGN BICKFORD 2 / SIMSBURY, CT C / FFP JMC ROCK ISLAND Mar 2025 Sep 2026 7,000 54.90 Y Aug 2024 5.1.5) CHG, DML, XPL ROLL, 38 FT, 14 (M980) 2025 (9) ENSIGN BICKFORD 2 / SIMSBURY, CT C / FFP JMC ROCK ISLAND Mar 2025 Nov 2026 10,719 23.71 Y Aug 2024 5.1.13) CHARGE, DEMO SHEET, FLEXIBLE, 0.043 THICK (M994) 2024 ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Mar 2024 Sep 2025 16,568 11.76 Y Jun 2023 TBD / TBD C / FFP NSWC CRANE Jun 2026 Sep 2027 5,040 48.57 Y Aug 2025 5.1.16) CONTAINER, DML CHG, MK-1 (M474) 2026 (6) (7) (10) (Each) 6.1.1) SIG, SMK ILLUM, MAR, MK 141, GREEN (LA26) 2022 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NSWC CRANE Mar 2022 Sep 2024 170 2,837.16 Y Aug 2021 6.1.1) SIG, SMK ILLUM, MAR, MK 141, GREEN (LA26) 2025 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NSWC CRANE May 2025 Sep 2027 185 6,972.97 Y Mar 2025 6.1.1) SIG, SMK ILLUM, MAR, MK 141, GREEN (LA26) 2026 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NSWC CRANE Oct 2025 Oct 2026 428 3,071.03 Y Aug 2025 LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 13 of 20 P-1 Line #13 Volume 1 - 201 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements 6.1.2) SIG, SMK ILLUM, MAR, MK 144/118, YELLOW (LA27) O O C FY 2024 (11) P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Method/Type or Funding Vehicle CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND Contractor and Location Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery MIPR NO PCO Aug 2024 Sep 2025 412 3,470.87 Y Sep 2023 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 6.1.3) MARKER, LOCATION, SUB, MK 140, RED (LA28) 2022 CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND MIPR NO PCO Mar 2022 Sep 2024 266 2,899.00 Y Aug 2021 6.1.3) MARKER, LOCATION, SUB, MK 140, RED (LA28) 2023 CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND MIPR NO PCO Sep 2023 Oct 2025 137 2,956.98 Y Aug 2021 6.1.3) MARKER, LOCATION, SUB, MK 140, RED (LA28) 2027 CRANE ARMY AMMUNITION ACTIVITY / CRANE, IND C / FFP NSWC CRANE Mar 2027 Mar 2030 168 6,213.54 Y Aug 2026 7.1.1) CHARGE, SHOCK TEST, 60 LB (XW65) 2021 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NO PCO Jul 2021 Aug 2023 500 2,026.90 Y Oct 2020 7.1.1) CHARGE, SHOCK TEST, 60 LB (XW65) 2023 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NO PCO Mar 2023 Mar 2025 498 2,108.78 Y Oct 2022 7.1.1) CHARGE, SHOCK TEST, 60 LB (XW65) 2025 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NO PCO Mar 2025 Sep 2027 395 2,719.32 Y Aug 2024 7.1.1) CHARGE, SHOCK TEST, 60 LB (XW65) 2027 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NO PCO Mar 2027 Mar 2029 500 2,829.18 Y Aug 2026 8.1.2) SIG, SMK ILLUM, MAR, MK 124/1, DISTRESS (LA60) 2022 COMBINED SYSTEMS INC. / JAMESTOWN, NY C / FFP JMC ROCK ISLAND Mar 2022 Sep 2023 5,000 131.93 Y Aug 2021 8.1.2) SIG, SMK ILLUM, MAR, MK 124/1, DISTRESS (LA60) 2023 COMBINED SYSTEMS INC. / JAMESTOWN, NY C / FFP JMC ROCK ISLAND Aug 2023 Feb 2025 5,724 137.49 Y Aug 2021 8.1.3) SIG KIT MK 189, MOD 0 (L564) 2023 CRANE ARMY AMMUNITION ACTIVITY1 / NSWC CRANE, IND MIPR NCO PCO Sep 2023 Apr 2025 200 148.15 Y Aug 2022 SECURITY SIGNALS INC / CORDOVA, TN C / FFP NSWC CRANE Sep 2025 Sep 2027 1,868 104.70 Y Jul 2023 8.1.4) SIGNAL KIT, PERS DISTRESS, MK79 (L118) 2024 (12) 8.1.5) SIGNAL, SMK, GROUND, M129A1, RED PARA (L323) 2027 TBD / TBD C / FFP JMC ROCK ISLAND Mar 2027 Mar 2029 8,250 65.92 Y Aug 2026 8.1.6) SIGNAL, SMK, GROUND, M128A1, GREEN PARA (L324) 2027 TBD / TBD C / FFP JMC ROCK ISLAND Mar 2027 Mar 2029 8,250 65.92 Y Aug 2026 9.1.2) SIM, PROJ, GROUND BURST (L594) 2027 TBD / TBD C / FFP JMC ROCK ISLAND Mar 2027 Mar 2029 22,798 26.81 Y Aug 2026 10.1.1) CAP, BLASTING, M7, NONELECTRIC, NONPROPAGATING PACK (M131) 2023 (13) STRESAU LABS / SPOONER, WI. C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 3,400 37.15 Y Nov 2023 10.1.2) CAP, BLASTING, M6, ELECTRIC, NONPROPAGATING PACK (M130) 2023 (14) STRESAU LABS / SPOONER, WI. C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 560 41.20 Y Nov 2023 10.1.4) CHARGE, DEMOLITION, M112, BLOCK, WITH TAGGANT (M023) 2023 (15) AMERICAN ORDANCE / Middletown, IA C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 14,520 55.83 Y Nov 2023 LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 14 of 20 P-1 Line #13 Volume 1 - 202 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Cost Elements O O C FY P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Integrated Warfare Systems Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 10.1.5) CHARGE, DEMOLITION, EXPLOSIVE SHEET (M980) 2023 (16) ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 1,064 82.93 Y Nov 2023 10.1.6) CORD, DETONATING, REINFORCED, PLIOFILM, PETN (M456) 2023 (17) ENSIGN BICKFORD / SIMSBURY, CT C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 136,000 1.20 Y Nov 2023 10.1.7) FUSE, BLASTING, TIME, M700 (M670) 2023 (18) RTI TECHNOLOGIES / COLUMBIA, CT. C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 50,000 1.47 Y Nov 2023 10.1.8) M81, IGNITER M81 IGNITER, TIME BLASTING FUSE (MN08) 2023 (19) ULTRA DEFENSE CORP / TAMPA BAY, FL C / FFP JMC ROCK ISLAND Jan 2024 Jan 2026 720 8.35 Y Nov 2023 10.1.9) DEMO KIT, BANGALORE TORPEDO M1A2E1 2 1/2 FT (MP03) 2023 (20) Accurate Energetics Systems / McEwen, TX C / FFP JMC ROCK ISLAND Sep 2024 Dec 2025 1,450 2,111.28 Y Nov 2023 16.1.1) CHARGE, DEMOLITION, M112, BLOCK, WITH TAGGANT (M023) 2025 AMERICAN ORDANCE / Middletown, IA MIPR JMC ROCK ISLAND Feb 2025 Nov 2028 81,510 37.71 Y Dec 2024 17.1.1) LEAD,PYROTECHNIC,M 34 MOD 0 (DWEI) 2025 ENSIGN BICKFORD / SIMSBURY, CT C / FFP NSWC CRANE Sep 2025 Sep 2027 4,251,244 0.54 Y May 2025 Footnotes: (6) FY2024 contract delay due to NSWC Crane legal redirecting the procurement to a different contract vehicle with slightly longer lead time. Updated pricing to reflect actuals. Unit price increased due to overall market forces on modified commercial item. (7) (8) (9) M456 - Updated pricing to reflect actuals. Unit price decrease due to efficiency gains based on volume of buy when combined with other services. M981 - Updated pricing to reflect actuals. Unit price decrease due to efficiency gains based on volume of buy when combined with other services. M980 - Updated pricing to reflect actuals. Unit price decrease due to efficiency gains based on volume of buy when combined with other services. (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) FY2026 contract award shifted from March 2026 to June 2026 due to SAP NSWC Crane contracting delays associated with reduction in personnel in critical contracting roles. FY2024 contract award was delayed due to on-going negotiations regarding unit price with CAAA. FY2024 contract award was delayed due to contractor gathering data to address an obsolescence concern. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. FY2023 Delivery date updated to actual delivery; increased demand due to Ukraine replenishment efforts increased delivery timeline. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 15 of 20 P-1 Line #13 Volume 1 - 203 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 19.678 1.813 1.691 1.773 0.000 1.773 - - - - - - 19.678 1.813 1.691 1.773 0.000 1.773 - - - - - - 19.678 1.813 1.691 1.773 0.000 1.773 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - AJNSW PE/QA SMCA Cost Recurring Cost 1.1.1) AJNSW PE/QA (21) - - 0.875 - - 0.145 - - 0.148 - - 0.151 - - 0.000 - - 0.151 Subtotal: Recurring Cost - - 0.875 - - 0.145 - - 0.148 - - 0.151 - - 0.000 - - 0.151 Subtotal: Hardware AJNSW PE/QA SMCA Cost - - 0.875 - - 0.145 - - 0.148 - - 0.151 - - 0.000 - - 0.151 SMCA Hardware - Hardware-AJNSW DET, CORDS, CAPS, FUZES Cost Recurring Cost 2.1.1) INITIATOR, PYRO LEAD 39.25 27,900 1.095 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 132.27 21,419 2.833 155.67 2,524 0.393 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.3) CAP, BLASTING, ELECTRIC MK 18 MOD 0 (DWHH) 53.67 6,000 0.322 60.00 7,400 0.444 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.4) CHG, FLEX LINEAR, LOW HAZARD (ECT) (MM24) 25.42 26,550 0.675 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.5) CHG, BOOSTER, 20 GM, MK 140 (MM30) 3.70 30,000 0.111 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) WATERPROOF(MM91) 2.1.2) DETONATOR, W IN-LINE INITIATOR 40FT (MP29) (†) LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 16 of 20 P-1 Line #13 Volume 1 - 204 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 2.1.6) IGNITER, TIME BLASTING FUZE (MN08) 5.62 306,760 1.724 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.7) CONNECTOR DET CORD PLASTIC (MW49) 0.15 158,600 0.024 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost Subtotal: Hardware Hardware-AJNSW DET, CORDS, CAPS, FUZES Cost - - 6.784 - - 0.837 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 6.784 - - 0.837 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - AJNSW MINE CHARGERS & CHARGE CUTTERS Cost Recurring Cost 3.1.1) CHG, DEMO, EXPLOSIVE SHEET, .333 (M986) 175.63 7,516 1.320 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.2) CHG, DEMO, EXPLOSIVE SHEET, .083 (M980) 15.71 25,843 0.406 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.3) CHG, DEMO, EXPLOSIVE SHEET, .125 ( M981) 27.19 15,190 0.413 68.45 10,000 0.685 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,478.37 832 1.230 - - 0.000 - - 0.000 775.00 630 0.488 - - 0.000 775.00 630 0.488 26.95 46,500 1.253 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,500.99 1,006 1.510 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.4) CHG, DEMO, 40LB BLK Cratering (†) (M039) 3.1.5) CHG, DML, BLK, COMP C-4, 1.25 (†) (M023) 3.1.6) CHG, DEMO, MK 138 HAVERSACK C-4, 2 (M792) (†) Subtotal: Recurring Cost - - 6.132 - - 0.685 - - 0.000 - - 0.488 - - 0.000 - - 0.488 Subtotal: Hardware AJNSW MINE CHARGERS & CHARGE CUTTERS Cost - - 6.132 - - 0.685 - - 0.000 - - 0.488 - - 0.000 - - 0.488 2.091 - - 0.000 27.60 50,000 1.380 28.68 21,517 0.617 - - 0.000 28.68 21,517 0.617 Hardware - AJNSW TRAINING DEVICES Cost Recurring Cost 4.1.1) SIM, HAND GRENADE, M116 (L601) (†) 19.61 106,650 LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 17 of 20 P-1 Line #13 Volume 1 - 205 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) 4.1.2) FLARE, SURFACE TRIP M49 (L495) 40.60 5,000 0.203 - - 0.000 - - 0.000 4.1.3) EWAG FIRING DEVICE, RFD KIT, DSRT - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.294 - - 0.000 - - 1.380 - - 2.294 - - 0.000 - - 5.1.1) SIGNAL DIVERS AUDIBLE RECALL (3W92) 115.09 921 0.106 - - 0.000 - 5.1.2) SIM, PROJ, GROUND BURST M115A2 (L594) 16.77 21,700 0.364 - - 0.000 Subtotal: Recurring Cost - - 0.470 - - - - 0.470 - Subtotal: Hardware - AJNSW TRAINING DEVICES Cost Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 - - 0.000 12 0.376 - - 0.000 - - 0.993 - - 0.000 1.380 - - 0.993 - - - 0.000 - - 0.000 - - - 0.000 - - 0.000 0.000 - - 0.000 - - - 0.000 - - 0.000 - 31,372.00 Unit Cost ($) - Total Cost Qty (Each) ($ M) - 0.000 12 0.376 - - 0.993 0.000 - - 0.993 - 0.000 - - 0.000 - - 0.000 - - 0.000 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.000 - - 0.000 31,372.00 Hardware - AJNSW SIGNALS Cost Recurring Cost Subtotal: Hardware AJNSW SIGNALS Cost Hardware - AJNSW TRANSPORTATION CODE COST Cost Recurring Cost 6.1.1) AJNSW TAC CODE - - 0.033 - - 0.031 - - 0.029 - - 0.032 - - 0.000 - - 0.032 Subtotal: Recurring Cost - - 0.033 - - 0.031 - - 0.029 - - 0.032 - - 0.000 - - 0.032 Subtotal: Hardware AJNSW TRANSPORTATION CODE COST Cost - - 0.033 - - 0.031 - - 0.029 - - 0.032 - - 0.000 - - 0.032 Hardware - ENACTED RESCISSIONS Cost Recurring Cost 7.1.1) ENACTED RESCISSIONS - - 0.366 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.366 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware ENACTED RESCISSIONS Cost - - 0.366 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.724 - - 0.115 - - 0.134 - - 0.109 - - 0.000 - - 0.109 Support - AGNSW PRODUCTION ENGINEERING Cost 8.1) PRODUCTION ENGINEERING - - LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 18 of 20 P-1 Line #13 Volume 1 - 206 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Naval Special Warfare MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Support AGNSW PRODUCTION ENGINEERING Cost - - 2.724 - - 0.115 - - 0.134 - - 0.109 - - 0.000 - - 0.109 Gross/Weapon System Cost - - 19.678 - - 1.813 - - 1.691 - - 1.773 - - 0.000 - - 1.773 (†) indicates the presence of a P-5a Footnotes: (21) Single Manager for Convention Ammunition (SMCA) Engineering Support of Items in Production (ESIP) provides for civilian personnel salaries, materiel costs and travel/per diem of civilian and military personnel performing production engineering activities directly associated with product procurement related to end items including components/parts. ESIP costs will vary year to year with the complexity of the items procured, amounts of undelivered quantity, and the amount of problems encountered by the vendors. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 19 of 20 P-1 Line #13 Volume 1 - 207 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC]: 2 / Naval Special Warfare FY Contractor and Location Method/Type or Funding Vehicle 2.1.1) INITIATOR, PYRO LEAD WATERPROOF(MM91) 2024 TBD / TBD MIPR ROCK ISLAND, IL Apr 2024 Oct 2025 27,900 39.24 N Dec 2023 Aug 2023 2.1.2) DETONATOR, W IN-LINE INITIATOR 40FT (MP29) 2024 TBD / TBD MIPR ROCK ISLAND, IL Apr 2024 Apr 2025 2,588 152.62 N Dec 2023 Jun 2023 TBD / TBD MIPR ROCK ISLAND, IL Feb 2023 Aug 2024 632 0.00 N Nov 2022 Sep 2022 Cost Elements 3.1.4) CHG, DEMO, 40LB BLK Cratering (M039) O O C P-1 Line Item Number / Title: 0340 / Pyrotechnic and Demolition 2021 (22) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) 3.1.5) CHG, DML, BLK, COMP C-4, 1.25 (M023) 2022 TAMERICAN ORDNANCE LLC / MIDDLETOWN, IA C / FFP MIDDLETOWN, IA Aug 2022 Feb 2024 1,140 60.53 Y 3.1.6) CHG, DEMO, MK 138 HAVERSACK C-4, 2 (M792) 2023 TBD / TBD WR NSWC CRANE Mar 2023 Mar 2025 1,006 1,501.00 N 4.1.1) SIM, HAND GRENADE, M116 (L601) 2022 PYROTECHNIQUE BY GRUCCI, INC / RADFORD, VA C / FFP BROOKHAVEN, NY Jun 2022 Dec 2023 32,400 24.14 Y RFP Issue Date Nov 2021 Oct 2022 Jul 2022 Oct 2021 Footnotes: (22) Contract award delay due to multiple revisions of Acquisition Strategy on the Justification and Approval (J&A). Quantity is too small for a stand alone procurement. LI 0340 - Pyrotechnic and Demolition Navy UNCLASSIFIED Page 20 of 20 P-1 Line #13 Volume 1 - 208 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0400 / Ammunition less than $5 million Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 103.190 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 103.190 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 103.190 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1.703 1.670 1.692 0.000 1.692 1.766 1.804 1.841 - - - - - - - - 1.703 1.670 1.692 0.000 1.692 1.766 1.804 1.841 - - - - - - - - 1.703 1.670 1.692 0.000 1.692 1.766 1.804 1.841 To FY 2031 Complete 1.879 Continuing - Continuing - 1.879 Continuing - Total - Continuing - - 1.879 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program provides funding for ammunition with a value less than $5 million. These pyrotechnic devices consist of Parachute Flares (Paraflares) and Marine Location Markers (MLMs). Paraflares provide battlefield illumination of surface areas in search and attack operations in the near infrared spectrum and are deployed from fixed wing aircraft (racks or dispensers) or rotary wing aircraft (dispensers). MLMs produce both a yellow flame and white smoke and are visible for three miles under normal operating conditions. MLMs are deployed from fixed-wing aircraft racks or hand-deployed from rotary-wing aircraft. MLMs are also hand deployed from surface vessels. The Mk-25 and Mk-58 MLM units are used in a variety of situations to include Search and Rescue operations, Man Overboard drills, and Target Marking in support of Fleet Operations and Readiness. LI 0400 - Ammunition less than $5 million Navy UNCLASSIFIED Page 1 of 4 P-1 Line #15 Volume 1 - 209 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0400 / Ammunition less than $5 million Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Ammunition less than $5 million P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 103.190 - / 1.703 - / 1.670 - / 1.692 - / 103.190 - / 1.703 - / 1.670 - / 1.692 - / - - / 1.692 / 0.000 - / 1.692 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding is required to procure Mk-25 Marine Location Markers (MLMs) to enable day and night Search and Rescue operations as well as target marking from aircraft and surface combatants. FY 2027 funding is required for Marine Location Markers Production Support which includes product improvements needed for components designed as well as Production Engineering Support, Integrated Logistics Support, Reliability Life (i.e. Safety and Product Improvement Program, Quality Assurance and Acceptance Testing). LI 0400 - Ammunition less than $5 million Navy UNCLASSIFIED Page 2 of 4 P-1 Line #15 Volume 1 - 210 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0400 / Ammunition less than $5 million Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Ammunition less than $5 million FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) HARDWARE 1.1) (A5012) MK-25 MARINE LOCATION A 464.66 8,856 4.115 484.10 2,232 1.081 493.78 2,121 1.047 503.07 2,125 1.069 - - - 503.07 2,125 1.069 645.91 49,129 31.733 - - - - - - - - - - - - - - - 1,561.69 25,393 39.656 - - - - - - - - - - - - - - - - - 0.895 - - - - - - - - - - - - - - - - - 76.399 - - 1.081 - - 1.047 - - 1.069 - - - - - 1.069 - - 24.072 - - 0.622 - - 0.623 - - 0.623 - - - - - 0.623 - - 2.719 - - - - - - - - - - - - - - - Subtotal: 2) PRODUCTION SUPPORT - - 26.791 - - 0.622 - - 0.623 - - 0.623 - - - - - 0.623 Total - - 103.190 - - 1.703 - - 1.670 - - 1.692 - - - - - 1.692 (†) MARKERS 1.2) (A5010) MK-58 MARINE LOCATION A (†) MARKERS 1.3) (A5011) PARAFLARES A 1.4) (A5894) Miscellaneous A Subtotal: 1) HARDWARE 2) PRODUCTION SUPPORT 2.1) (A5821) MARINE LOCATION MARKERS A 2.2) (A5820) Paraflares Support A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 0400 - Ammunition less than $5 million Navy UNCLASSIFIED Page 3 of 4 P-1 Line #15 Volume 1 - 211 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0400 / Ammunition less than $5 million Method/Type or Funding Vehicle Aggregated Items: Ammunition less than $5 million Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 1.1) (A5012) MK-25 MARINE LOCATION MARKERS 2025 HFI PYROTECHNICS INC / Ontario, Canada C / FFP Crane, IN Sep 2025 Jun 2026 2,232 484.10 Y Jun 2024 1.1) (A5012) MK-25 MARINE LOCATION MARKERS 2026 HFI PYROTECHNICS INC / Ontario, Canada C / FFP Crane, IN Jul 2026 Apr 2027 2,121 493.78 Y Jun 2024 1.1) (A5012) MK-25 MARINE LOCATION MARKERS 2027 HFI PYROTECHNICS INC / Ontario, Canada C / FFP Crane, IN Jul 2027 Apr 2028 2,125 503.07 Y Jun 2024 1.2) (A5010) MK-58 MARINE LOCATION MARKERS 2024 HFI PYROTECHNICS INC / Ontario, Canada C / FFP Crane, IN Jun 2024 Jun 2025 1,910 453.00 Y Nov 2018 (Each) 1) HARDWARE LI 0400 - Ammunition less than $5 million Navy UNCLASSIFIED Page 4 of 4 P-1 Line #15 Volume 1 - 212 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 262.575 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 262.575 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 262.575 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 30.229 30.822 49.273 50.261 - 588.005 588.005 588.005 0.000 0.000 0.000 165.662 165.662 165.662 0.000 0.000 0.000 165.662 165.662 - - - - - 30.229 30.822 49.273 50.261 - 165.662 To FY 2031 Complete - - - - - 30.229 30.822 49.273 50.261 - Total 1,176.827 1,176.827 1,176.827 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Expeditionary Loitering Munitions Portfolio consists of a family of Navy loitering munition programs (air and surface) designed to meet an urgent Geographic Combatant Command Requirement. Air and Surface Expeditionary Loitering Munitions will leverage and continue prior development efforts including an Office of Naval Research (ONR) Innovative Naval Prototype (INP). The Navy is pursuing commercialoff-the-shelf solutions with autonomous government-provided software and auxiliary systems. The systems will be expeditionary and deployable by small teams to support operations in various environments. The air system has transitioned from Low-Rate Initial Production to Full-Rate Production with the initial vendor solutions and is now expanding the industrial base for this capability by integrating government-owned technology with other vendor platform solutions. The surface system has transitioned from the ONR INP and is now in Low-Rate Initial Production. FY 2026 spend plan for air system production includes $0 thousand of discretionary funding and $247,000 thousand of mandatory funding for a total of $247,000 thousand. Mandatory funds support the contract award for Phase III production of 660 rounds. [P40A / C-UAS Theodore Roosevelt Carrier Strike Group Munitions]: This newly established cost element funded an emergent requirement in support of the Counter-Unmanned Aircraft Systems (C-UAS) Theodore Roosevelt Carrier Strike Group (TRSCG) Munitions, funding C-UAS All Up Rounds (AUR) Prototyping Kinetic Build Munitions in FY 2025. [P40A / AIR SYSTEM MATERIALS]: Air system materials funding procures long lead time material to facilitate rapid procurement efforts. [P40A / AIR SYSTEM PRODUCTION]: Air system production funding supports NRE associated with munition production as well as management reserve for cost type contract expenses. [P40A / AIR SYSTEM MUNITIONS]: Air system munition funding supports production of All Up Round air systems and Ground Support Equipment. LI 1776 - Expeditionary Loitering Munitions Navy UNCLASSIFIED Page 1 of 8 P-1 Line #16 Volume 1 - 213 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Expeditionary Loitering Munitions P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 262.575 - / 588.005 - / 262.575 - / 588.005 - / - - / 165.662 / 0.000 - / 165.662 - / - - / 165.662 / 0.000 - / 165.662 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds air system production, spares and training round deliveries and surface system production and long lead material purchases. These units will be procured to meet Geographic Combatant Command quantity requirement. Concurrent RDTEN and PANMC funding due to the completion of spiral software development in parallel with full rate production. LI 1776 - Expeditionary Loitering Munitions Navy UNCLASSIFIED Page 2 of 8 P-1 Line #16 Volume 1 - 214 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Munitions ($) Code 1) Expeditionary Loitering Munitions 1.1) C-UAS Theodore Roosevelt Carrier Strike Group Unit Cost Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (1) A - - - - - 9.300 - - - - - - - - - - - - 1,005 19.222 - - - - - - - - - - - - - - - - 19.316 - - 65.305 - - - - - 3.606 - - - - - 3.606 510 224.037 237,000.00 2,100 497.700 - - - 300,000.00 60 18.000 - - - 300,000.00 60 18.000 (2) 1.2) AIR SYSTEM MATERIALS (†) A 1.3) AIR SYSTEM PRODUCTION MUNITIONS 19,126.37 - (3) 1.4) AIR SYSTEM 439,288.24 (4)(†) 1.5) SURFACE SYSTEM MUNITIONS - - - - - - - - - Subtotal: 1) Expeditionary Loitering Munitions - - Total - - (5)(†) 1.6) SURFACE SYSTEM MATERIAL A 1.7) SURFACE SYSTEM A (6)(†) PRODUCTION (7) - - - - - - 325,000.00 400 130.000 - - - 325,000.00 400 130.000 290 8.700 - - - 12,443.00 400 4.977 - - - 12,443.00 400 4.977 - - 7.000 - - - - - 9.079 - - - - - 9.079 262.575 - - 588.005 - - - - - 165.662 - - - - - 165.662 262.575 - - 588.005 - - - - - 165.662 - - - - - 165.662 30,000.00 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Qty Aggregated Items Title: Expeditionary Loitering Munitions indicates the presence of a P-5a Footnotes: (1) FY 2025 continues funding lots of full rate production. Increase from FY 2024 due to increased quantity of rounds procured resulting from increased production system maturity and production capacity at the Prime Contractor in order to meet JEON quantity requirement. Concurrent RDTEN and PANMC funding due to the completion of spiral software development in parallel with full rate production. (2) Counter-Unmanned Aircraft Systems (C-UAS) Theodore Roosevelt Carrier Strike Group (TRSCG) Munitions - This newly established cost element funded an emergent requirement in support of the C-UAS TRSCG, funding C-UAS All Up Rounds (AUR) Prototyping Kinetic Build Munitions in FY 2025. (3) (4) (5) FY 2027 funding increased from $0.00 in FY 2026 to $3.606 in FY 2027 to increase round production and re-starting production line. FY 2027 funding increased from $0.00 in FY 2026 to $18M in FY 2027 to continue round production. The program increased from $0.00 in FY 2026 to $130.000 in FY 2027 due to reconciliation. FY 2027 funds production of 400 rounds and leverages material, including spares, procured in FY 2027. FY 2027 Production includes escalation/ inflation, system maturation, production line ramp up, and support inventory quantity replacement post-FOC. (6) (7) FY 2027 funding increased from $0.00 in FY 2026 to $4.977M in FY 2027 for long lead material buys required to maintain schedule and obsolescence item issues. The program increased from $0.00 in FY 2026 to $9.079 in FY 2027 to support the quantity of rounds being produced. Production supports manufacturing efforts, system of systems baseline configuration management, inspections, and certification. LI 1776 - Expeditionary Loitering Munitions Navy UNCLASSIFIED Page 3 of 8 P-1 Line #16 Volume 1 - 215 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Expeditionary Loitering Munitions Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Expeditionary Loitering Munitions 1.2) AIR SYSTEM MATERIALS 2023 Raytheon / Tucson, AZ SS / CPIF Washington, DC Nov 2023 Nov 2024 550 23,000.00 N 1.2) AIR SYSTEM MATERIALS 2024 Raytheon / Tucson, AZ SS / CPIF Washington, DC Apr 2024 Apr 2025 455 14,444.00 Y 2024 Raytheon / Tucson, AZ SS / CPIF Washington, DC Aug 2024 Jul 2026 510 439,289.00 N Mar 2024 Dec 2023 2025 Raytheon / Tucson, AZ SS / CPIF Washington, DC Jul 2025 Dec 2026 2,100 237,000.00 N Mar 2024 Dec 2023 2027 Raytheon / Tucson, AZ C / FFP Washington, DC Mar 2027 Dec 2027 60 300,000.00 Y Aug 2026 2027 TBD / Various C / TBD ** NO PCO ** Oct 2026 Jan 2027 400 325,000.00 Y Mar 2026 2025 Various / Various C / TBD Various Jun 2025 Dec 2025 290 30,000.00 N Mar 2024 Oct 2024 2027 USMI / Gulfport, MS C / FFP Washington, DC Oct 2026 Dec 2027 400 12,443.00 N Mar 2028 Jun 2025 1.4) AIR SYSTEM MUNITIONS (4)(†) 1.4) AIR SYSTEM MUNITIONS (4)(†) 1.4) AIR SYSTEM MUNITIONS (4)(†) 1.5) SURFACE SYSTEM MUNITIONS (5) 1.6) SURFACE SYSTEM MATERIAL (6) 1.6) SURFACE SYSTEM MATERIAL (†) (6) (8) Jan 2024 Jul 2023 Jan 2024 indicates the presence of a P-21 Footnotes: (8) Initial contract RFP release was delayed 6 mo due to agency level protest of the Sole Source Justification and Approval (J&A) LI 1776 - Expeditionary Loitering Munitions Navy UNCLASSIFIED Page 4 of 8 P-1 Line #16 Volume 1 - 216 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Expeditionary Loitering Munitions Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Expeditionary Loitering Munitions 1.4) AIR SYSTEM MUNITIONS (4) 19 2024 NAVY 510 0 510 19 2025 NAVY 2,100 0 2,100 19 2027 NAVY 60 0 60 A - - - - - - - - - - - - - - 510 A - - - 2,100 60 O C T LI 1776 - Expeditionary Loitering Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 217 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Expeditionary Loitering Munitions D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 150 150 150 150 150 150 200 200 200 200 400 - 60 D E C J A N F E B Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V 1) Expeditionary Loitering Munitions 1.4) AIR SYSTEM MUNITIONS (4) 19 2024 NAVY 510 0 510 - - - - - - - - - 176 - - - 334 19 2025 NAVY 2,100 0 2,100 - - - - - - - - - - - - - - 19 2027 NAVY 60 0 60 0 A - O C T LI 1776 - Expeditionary Loitering Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 218 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Expeditionary Loitering Munitions Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Expeditionary Loitering Munitions 1.4) AIR SYSTEM MUNITIONS (4) 19 2024 NAVY 510 510 0 19 2025 NAVY 2,100 1,700 400 200 200 0 19 2027 NAVY 60 0 60 - - O C T LI 1776 - Expeditionary Loitering Munitions Navy N O V 0 30 D E C 30 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 219 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 01 / 1 P-1 Line Item Number / Title: 1776 / Expeditionary Loitering Munitions Production Rates (Each / Year) MFR Ref # Aggregated Items: Expeditionary Loitering Munitions Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 1 Raytheon - Tucson, AZ MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 12 Total After Oct 1 ALT Prior to Oct 1 12 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 9 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1776 - Expeditionary Loitering Munitions Navy UNCLASSIFIED Page 8 of 8 P-1 Line #16 Volume 1 - 220 9 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 273.011 273.011 273.011 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 128.321 128.321 128.321 141.135 141.135 141.135 181.464 - 0.000 - 181.464 - 0.000 - 181.464 0.000 181.464 181.464 181.464 194.511 194.511 194.511 152.866 152.866 152.866 148.669 148.669 148.669 To FY 2031 Complete 151.641 Continuing 151.641 Continuing Continuing 151.641 Total - Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The 1085 Mortar Ammunition budget procures and provides the Fleet Marine Force with 60MM mortar ammunition and 81MM mortar ammunition in provision of training and war reserve munitions requirements for Lightweight and Medium Weight Mortar Systems. The family of Mortar Cartridges includes all 60MM mortar cartridges and 81MM mortar cartridges which consist of high explosive, smoke, illumination and full range training practice rounds The 60mm Mortar cartridges are designed for use with the M224 60mm Lightweight Company Mortar System (LWCMS), a key indirect fire support weapon for Marine Corps infantry units. The M224's short minimum range makes its ammunition highly effective for: -Close protective fires against assaulting enemy forces. -Urban combat, including block-to-block fighting. -Engagements in close terrain with restricted visibility. The 81mm Mortar cartridges are designed for use with the M252 Mortar Weapon System, a crucial asset for providing medium-range indirect fire in support of Marine Corps infantry battalions. The M252 system enables battalion commanders to: -Engage targets at greater distances, beyond the reach of company-level assets. -Suppress, neutralize, and destroy enemy personnel and positions. -Provide battlefield obscuration and illumination to support maneuver. LI 1085 - Mortars Navy UNCLASSIFIED Page 1 of 25 P-1 Line #17 Volume 1 - 221 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / 1085 Mortars P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 273.011 - / 128.321 - / 141.135 - / 181.464 - / 0.000 - / 181.464 - / 273.011 - / 128.321 - / 141.135 - / 181.464 - / 0.000 - / 181.464 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 baseline funds for the 1085 Mortars budget support the Total Munitions Requirement (TMR), the Marine Corps' Approved Acquisition Objective. The TMR is the total number of rounds required for combat-ready forces. These funds replenish munitions expended in annual training and support deployment preparation, readiness, munitions lifecycle management and operational needs. These items are managed by the Army as the Single Manager for Conventional Ammunition (SMCA) and the unit costs are pre-negotiated in the contract established by the SMCA. These munitions have a procurement lead time of 24-44 months. FY 2027 Baseline Appropriation Request: $181.464M Baseline funding will support the procurement of mortars to include, but not limited to: DODIC B647 60mm M721 Illum Cartridge: The FY 2027 request is $2.139M. Funding will support replacement of rounds impacted by service life limitations in the inventory beginning in FY 2027 and are replenish munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. DODIC BA15 60MM M769 Full Range Practice Cartridge (FRPC): The FY 2027 request is $2.660M. The decrease of $13.212M from FY 2026 to FY 2027 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. DODIC BA44 60MM M720A2 High Explosive (HE) Cartridge: The FY 2027 request is $33.999M. The decrease of $33.655M from FY 2026 to FY 2027 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. DODIC C870 81MM M819 Smoke Red Phosphorous Cartridge: The FY 2027 request is $1.005M. The decrease of $8.488 from FY 2026 to FY 2027 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. Funding will be used for engineering support in production for prior year procurements. DODIC C875 81MM M879 Full Range Practice Cartridge (FRPC): The FY 2027 request is $7.063M. The decrease of $5.389M from FY 2026 to FY 2027 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. DODIC CA63 81MM M889A4 High Explosive (HE) Cartridge: The FY 2027 request is $122.821M. The increase of $93.538M from FY 2026 to FY 2027 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. DODIC CA66 81MM M821A4 High Explosive (HE) FRAG Cartridge: The FY 2027 request is $7.742M. The increase of $3.487M from FY26 to FY27 is in compliance with the current procurement strategy in support of Marine Corps Force Design and is the cumulative result of multiple requirement adjustments. LI 1085 - Mortars Navy UNCLASSIFIED Page 2 of 25 P-1 Line #17 Volume 1 - 222 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The budget increase of $40.329M from FY 2026 to FY 2027 reflects the mortars requirement adjustments due to Marine Corps Force Design and is the cumulative result of multiple training and operational requirement changes, while providing for warfighter training needs of DODIC BA15 60MM M769 Full Range Practice Cartridge, and DODIC C875 81MM Full Range Training Practice Cartridge, addresses inventory shortfalls of DODIC BA44 60MM M720A2 HE Cartridge, DODIC CA63 81MM M889A4 HE Cartridge and addresses service life limitations of DODIC B647 60mm M721 Illum Cartridge. Both BA44 and CA63 utilize IMX-104 explosive which improves the overall safety of the rounds at an increased cost compared to the legacy rounds. CA72 - 81MM FLASH BANG MUNITION NON-LETHAL has been moved into BLI 1085 from BLI 1550. All cost elements are consolidated to complete round/total hardware and production support costs to align with similar budget line items providing clear visibility of the final deliverable quantities and total unit costs. Funding is also provided for First Destination Transportation as needed to support emergent shipments. This budget line includes Mortars, All types, to include like-items, suitable substitutes, legacy items and outyear items. LI 1085 - Mortars Navy UNCLASSIFIED Page 3 of 25 P-1 Line #17 Volume 1 - 223 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 273.011 Less PY Advance Procurement ($ in Millions) 128.321 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 181.464 - 0.000 - 141.135 181.464 - 181.464 - 128.321 FY 2027 Total 0.000 - 141.135 - 273.011 - - 128.321 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 141.135 - 273.011 FY 2027 Base - 181.464 - 181.464 - 0.000 181.464 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - B647 CARTRIDGE, 60MM ILLUM Cost Recurring Cost 1.1.1) B647 Complete (†) (1) - - - - - - 1.1.2) B647 Production Support - - - - - - Subtotal: Recurring Cost - - - - - - Subtotal: Hardware - B647 CARTRIDGE, 60MM ILLUM Cost - - - - - Round 1,519.99 1,254 1.906 - - 0.220 - - 2.126 - - - 1,940.64 973 1.888 - - - - - 0.251 - - - - - 2.139 - - - 2.126 - - 2.139 - - 1,940.64 973 1.888 - - 0.251 - - 2.139 - - - 2.139 Hardware - BA15 CARTRIDGE, 60MM FULL RANGE PRACTICE Cost Recurring Cost 2.1.1) BA15 LOAD, ASSEMBLE AND (†) PACK (LAP) 2.1.2) BA15 FUZE (†) PRACTICE M775 2.1.3) BA15 SHELL (†) BODY 60MM FRPC 2.1.4) BA15 M702 IGNITION CARTRIDGE (†) 2.1.5) BA15 PROPELLANT CHARGE M235 (†) LI 1085 - Mortars Navy 18.60 227,842 4.239 91.80 52,165 4.789 - - - - - - - - - - - - 20.29 234,677 4.761 27.99 52,072 1.457 - - - - - - - - - - - - 36.97 234,677 8.675 47.33 52,072 2.465 - - - - - - - - - - - - 14.52 234,677 3.407 38.85 52,072 2.023 - - - - - - - - - - - - 12.64 938,709 11.869 16.40 208,290 3.416 - - - - - - - - - - - - UNCLASSIFIED Page 4 of 25 P-1 Line #17 Volume 1 - 224 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements 2.1.6) BA15 FIN ($) (†) ASSEMBLY M27 2.1.7) BA15 Complete 7.36 FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 227,842 ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.677 17.68 52,072 0.921 - - - - - - - - - - - - (†) (2) - - - - - - 388.81 38,333 14.904 420.03 5,889 2.474 - - - 420.03 5,889 2.474 2.1.8) BA15 Production Support - - 2.854 - - 0.690 - - 0.968 - - 0.186 - - - - - 0.186 2.1.9) BA15 ACCEPTANCE TESTING - - 1.235 - - 0.352 - - - - - - - - - - - - Subtotal: Recurring Cost - - 38.717 - - 16.113 - - 15.872 - - 2.660 - - - - - 2.660 Subtotal: Hardware - BA15 CARTRIDGE, 60MM FULL RANGE PRACTICE Cost - - 38.717 - - 16.113 - - 15.872 - - 2.660 - - - - - 2.660 103.24 73,535 7.592 154.22 74,000 11.412 - - - - - - - - - - - - 7.84 107,903 0.846 17.68 72,168 1.276 - - - - - - - - - - - - 21.27 107,903 2.295 49.20 72,168 3.551 - - - - - - - - - - - - 17.85 421,712 7.526 38.30 303,674 11.631 - - - - - - - - - - - - 15.28 121,690 1.860 13.51 133,604 1.805 - - - - - - - - - - - - 99.89 3,784 0.378 102.21 4,115 0.421 - - - - - - - - - - - - 260.55 73,978 19.275 122.25 72,168 8.823 - - - - - - - - - - - - 89,031.91 94 8.369 102.72 72,168 7.413 - - - - - - - - - - - - 63.435 978.05 31,995 31.293 - - - 978.05 31,995 31.293 4.219 - - 2.706 - - - - - 2.706 Round Hardware - BA44 CTG MORTAR 60MM HE Cost Recurring Cost 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) (†) 3.1.2) BA44 FIN (†) ASSEMBLY M27 3.1.3) BA44 M702 IGNITION CARTRIDGE (†) 3.1.4) BA44 PROPELLANT (†) CHARGE, M235 3.1.5) BA44 EXPLOSIVE FILL (†) IMX-104 3.1.6) BA44 PBWX-12 BULK EXPLOSIVE (†) 3.1.7) BA44 FUZE (†) MOFM, M734A1 3.1.8) BA44 SHELL BODY, 60MM HE (†) 3.1.9) BA44 Complete (†) (3) - - - - - - 622.31 3.1.10) BA44 Production Support - - 3.615 - - 3.915 - Round LI 1085 - Mortars Navy 101,935 - UNCLASSIFIED Page 5 of 25 P-1 Line #17 Volume 1 - 225 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 3.1.11) BA44 ACCEPTANCE TESTING - - 0.232 - - 0.211 - - - - - - - - - - - - Subtotal: Recurring Cost - - 51.988 - - 50.458 - - 67.654 - - 33.999 - - - - - 33.999 Subtotal: Hardware - BA44 CTG MORTAR 60MM HE Cost - - 51.988 - - 50.458 - - 67.654 - - 33.999 - - - - - 33.999 6,557 8.648 - - - - - - - - - Hardware - C870 CTG MORTAR 81MM SMOKE Cost Recurring Cost 4.1.1) C870 Complete (†) (4) - - - - - - 4.1.2) C870 Production Support - - 1.000 - - - - - 0.845 - - 1.005 - - - - - 1.005 Subtotal: Recurring Cost - - 1.000 - - - - - 9.493 - - 1.005 - - - - - 1.005 Subtotal: Hardware - C870 CTG MORTAR 81MM SMOKE Cost - - 1.000 - - - - - 9.493 - - 1.005 - - - - - 1.005 Round 1,318.86 Hardware - C875 CTG MORTAR 81MM FRPC Cost Recurring Cost 5.1.1) C875 LOAD, ASSEMBLE AND 42.95 287,568 12.352 128.68 61,680 7.937 - - - - - - - - - - - - 19.85 286,653 5.691 25.12 63,288 1.590 - - - - - - - - - - - - 43.76 286,653 12.545 61.01 63,688 3.886 - - - - - - - - - - - - 14.85 286,653 4.258 18.64 63,688 1.187 - - - - - - - - - - - - (†) 11.49 1,146,621 13.172 19.52 252,555 4.930 - - - - - - - - - - - - (†) 14.81 295,653 4.378 26.85 63,688 1.710 - - - - - - - - - - - - (†) PACK (LAP) 5.1.2) C875 FUZE PRACTICE, M751 (†) 5.1.3) C875 SHELL (†) BODY, 81MM FRPC 5.1.4) C875 IGN CTG M299 (†) 5.1.5) C875 CHG PROP 81MM M220 5.1.6) C875 FIN MORTAR CTG M24 5.1.7) C875 Complete (†) (5) - - - - - - 471.75 24,663 11.635 476.30 13,949 6.644 - - - 476.30 13,949 6.644 5.1.8) C875 Production Support - - 3.135 - - 1.076 - - 0.817 - - 0.419 - - - - - 0.419 5.1.9) C875 ACCEPTANCE TESTING - - 1.055 - - 0.422 - - - - - - - - - - - - Round LI 1085 - Mortars Navy UNCLASSIFIED Page 6 of 25 P-1 Line #17 Volume 1 - 226 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 56.586 - - 22.738 - - 12.452 - - 7.063 - - - - - 7.063 Subtotal: Hardware - C875 CTG MORTAR 81MM FRPC Cost - - 56.586 - - 22.738 - - 12.452 - - 7.063 - - - - - 7.063 Hardware - CA63 CTG MORTAR 81MM HE FRAG Cost Recurring Cost 6.1.1) CA63 LOAD, ASSEMBLE AND 129.07 191,892 24.768 205.74 49,251 10.133 - - - - - - - - - - - - 188.45 261,622 49.302 47.50 49,251 2.339 - - - - - - - - - - - - 17.28 336,492 5.815 47.50 49,251 2.339 - - - - - - - - - - - - (†) 15.87 1,345,966 21.367 49.88 175,187 8.738 - - - - - - - - - - - - (†) 18.80 336,492 6.325 26.90 49,251 1.325 - - - - - - - - - - - - 94.60 6,829 0.646 102.21 5,012 0.512 - - - - - - - - - - - - 25.43 202,962 5.161 30.20 130,259 3.934 - - - - - - - - - - - - 118.614 - - - (†) PACK (LAP) 6.1.2) CA63 FUZE PD, M783 (†) 6.1.3) CA63 IGN CTG M299 (†) 6.1.4) CA63 CHG PROP 81MM M220 6.1.5) CA63 FIN MORTAR CTG M24 6.1.6) CA63 PBXW-12 BULK EXPLOSIVE (†) 6.1.7) CA63 EXPLOSIVE FILL (†) IMX-104 6.1.8) CA63 Complete (†) (6) - - - - - - 714.33 36,426 26.020 6.1.9) CA63 Production Support - - 5.811 - - 2.088 - - 3.263 - - 4.207 - - - - - 4.207 6.1.10) CA63 ACCEPTANCE TESTING - - 2.242 - - 1.769 - - - - - - - - - - - - Subtotal: Recurring Cost - - 121.437 - - 33.177 - - 29.283 - - 122.821 - - - - - 122.821 Subtotal: Hardware - CA63 CTG MORTAR 81MM HE FRAG Cost - - 121.437 - - 33.177 - - 29.283 - - 122.821 - - - - - 122.821 2,727 3.694 4,961 6.854 - - - 4,961 6.854 - 0.561 - 0.888 - - - - 0.888 Round 1,002.57 118,310 1,002.57 118,310 118.614 Hardware - CA66 CTG MORTAR 81MM HE FRAG Cost Recurring Cost 7.1.1) CA66 Complete (†) (7) - - - - - - 7.1.2) CA66 Production Support - - 3.283 - - 0.988 Round LI 1085 - Mortars Navy 1,354.57 - UNCLASSIFIED Page 7 of 25 1,381.66 - P-1 Line #17 1,381.66 - Volume 1 - 227 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 3.283 - - 0.988 - - 4.255 - - 7.742 - - - - - 7.742 Subtotal: Hardware - CA66 CTG MORTAR 81MM HE FRAG Cost - - 3.283 - - 0.988 - - 4.255 - - 7.742 - - - - - 7.742 1,400 4.001 - - - 1,400 4.001 Hardware - CA72, 81MM FLASH BANG MUNITION NON-LETHAL Cost Recurring Cost 8.1.1) CA72 Complete (†) (8) - - - - - - - - - 8.1.2) CA72 Production Support - - - - - - - - - - - 0.034 - - - - - 0.034 Subtotal: Recurring Cost - - - - - - - - - - - 4.035 - - - - - 4.035 Subtotal: Hardware - CA72, 81MM FLASH BANG MUNITION NON-LETHAL Cost - - - - - - - - - - - 4.035 - - - - - 4.035 Round 2,858.01 2,858.01 Hardware - PD REPLENISHMENT TRANCHE 29 Cost Recurring Cost 9.1.1) TRANCHE 29 BA16 COMPLETE ROUND (†) 9.1.2) TRANCHE 29 CA43 COMPLETE ROUND (†) Subtotal: Recurring Cost - - - 605.07 2,054 1.243 - - - - - - - - - - - - - - - 778.66 4,628 3.604 - - - - - - - - - - - - - - - - - 4.847 - - - - - - - - - - - - Subtotal: Hardware PD REPLENISHMENT TRANCHE 29 Cost - - - - - 4.847 - - - - - - - - - - - - Gross/Weapon System Cost - - - - 128.321 - - - - - - 0.000 - - (†) 273.011 141.135 181.464 181.464 indicates the presence of a P-5a Footnotes: (1) (B647 Complete Round) The FY 2027 funding of $2.139M for B647 will address service life limitations in the inventory beginning in FY 2026 that support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The cost increase for mortar systems is directly attributable to price escalation in essential raw materials. This is a consequence of heightened, cross-commodity demand for specialized metal parts and high-explosive materials, which are also integral to the production of other strategic systems. FY 2027 B647 procurements with the current production lead time will be delivered in the beginning of FY 2029. LI 1085 - Mortars Navy UNCLASSIFIED Page 8 of 25 P-1 Line #17 Volume 1 - 228 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1085 / Mortars ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 1085 Mortars MDAP/MAIS Code: (2) (BA15 Complete Round) The budget decrease of $13.212M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The unit cost increase is a direct result of a reduced procurement quantity, which precludes the advantages of economies of scale and step-ladder pricing. (3) (BA44 Complete Round) The budget decrease of $33.655M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The cost increase for mortar systems is directly attributable to price escalation in essential raw materials. This is a consequence of heightened, cross-commodity demand for specialized metal parts and high-explosive materials, which are also integral to the production of other strategic systems. (4) (C870 Complete Round) The budget decrease of $8.488M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support in engineering support in production of C870. (5) (C875 Complete Round) The budget decrease of $5.389M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. (6) (CA63 Complete Round) The budget increase of $93.538M in FY 2027 is due to increase in quantities and reflects requirement adjustments due to Marine Corps Force Design. Significant funding increase was urgently required to procure CA63 M889A4 81mm High-Explosive (HE) Mortars and address a critical inventory shortfall. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The cost increase for mortar systems is directly attributable to price escalation in essential raw materials. This is a consequence of heightened, cross-commodity demand for specialized metal parts and high-explosive materials, which are also integral to the production of other strategic systems. The FY27 request of $118.614M procures 118,310 rounds to address a validated TMR shortfall of 693,391 rounds. While older C868 munitions will be transferred to temporarily supplement training stockpiles, this procurement is critical to filling the primary war reserve inventory with the correct, modern munition. (7) (CA66 Complete Round) The budget increase of $3.487M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The FY27 request of $6.854M procures 4,961 rounds to mitigate an urgent requirement created by the transfer of older C868 munitions out of the CA66 inventory. This procurement of the modern, more effective round is necessary to prevent a critical capability gap in our 81mm HE inventory. The 42-month lead time requires immediate funding to ensure delivery by FY32. (8) (CA72 Complete Round) The budget increase of $4.035M in FY 2027 reflects requirement adjustments due to Marine Corps Force Design. Current funding will support the replenishment of munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. LI 1085 - Mortars Navy UNCLASSIFIED Page 9 of 25 P-1 Line #17 Volume 1 - 229 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 O O C Cost Elements P-1 Line Item Number / Title: 1085 / Mortars Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Jan 2026 Jan 2028 1,254 1,519.99 Y 2.1.1) BA15 LOAD, ASSEMBLE AND PACK (LAP) 2025 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2025 May 2027 52,165 91.80 Y 2.1.2) BA15 FUZE PRACTICE M775 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Oct 2024 Oct 2026 52,072 27.99 Y 2.1.3) BA15 SHELL BODY 60MM FRPC 2025 MEDICO INDUSTRIES / WILKES-BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Oct 2024 Oct 2026 52,072 47.33 Y 2.1.4) BA15 M702 IGNITION CARTRIDGE 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Oct 2026 52,072 38.85 Y 2.1.5) BA15 PROPELLANT CHARGE M235 2025 GENERAL DYNAMICS OTS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Oct 2026 208,290 16.40 Y 2025 FLEXIBLE CONCEPTS / ELKHART, IN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Oct 2026 52,072 17.68 Y 2026 TBD / TBD C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 38,333 388.81 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Oct 2026 Oct 2026 5,889 420.03 Y 2024 DAY & ZIMMERMAN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2024 May 2027 34,267 84.20 Y 2025 DAY & ZIMMERMAN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2025 May 2028 74,000 154.22 Y 2025 FLEXIBLE CONCEPTS / ELKHART, IN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2026 72,168 17.68 Y 3.1.3) BA44 M702 IGNITION CARTRIDGE 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2026 72,168 49.20 Y 3.1.4) BA44 PROPELLANT CHARGE, M235 2025 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Sep 2026 303,674 38.30 Y 3.1.5) BA44 EXPLOSIVE FILL IMX-104 2025 BAE ORDNANCE SYSTEMS, INC. / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Oct 2025 133,604 13.51 Y 3.1.6) BA44 PBWX-12 BULK EXPLOSIVE 2025 BAE ORDNANCE SYSTEMS, INC. / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 4,115 102.21 Y 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH C / FFP PICATINNY ARSENAL, NJ Oct 2024 Oct 2025 72,168 122.25 Y 2025 GENERAL DYNAMICS OTS / WILKES-BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Oct 2024 Oct 2025 72,168 102.72 Y 2026 TBD / TBD C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 101,935 622.31 Y 1.1.1) B647 Complete Round 2.1.6) BA15 FIN ASSEMBLY M27 (†) 2.1.7) BA15 Complete Round (†) 2.1.7) BA15 Complete Round 3.1.1) BA44 LOAD, ASSEMBLE, (†) PACK (LAP) 3.1.1) BA44 LOAD, ASSEMBLE, (†) PACK (LAP) 3.1.2) BA44 FIN ASSEMBLY M27 3.1.7) BA44 FUZE MOFM, M734A1 (†) 3.1.8) BA44 SHELL BODY, 60MM HE (†) 3.1.9) BA44 Complete Round LI 1085 - Mortars Navy Location of PCO Item Number / Title [DODIC]: 1 / 1085 Mortars UNCLASSIFIED Page 10 of 25 P-1 Line #17 (Each) RFP Issue Date Volume 1 - 230 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 O O C P-1 Line Item Number / Title: 1085 / Mortars Item Number / Title [DODIC]: 1 / 1085 Mortars FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Oct 2026 Oct 2026 31,995 978.05 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2026 Feb 2028 6,557 1,318.86 Y 2025 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Oct 2026 61,680 128.68 Y 5.1.2) C875 FUZE PRACTICE, M751 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Oct 2024 Oct 2025 63,288 25.12 Y 5.1.3) C875 SHELL BODY, 81MM FRPC 2025 MEDICO INDUSTRIES / WILKES-BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Oct 2024 Oct 2026 63,688 61.01 Y 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 63,688 18.64 Y 5.1.5) C875 CHG PROP 81MM M220 2025 AMERICAN ORDNANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 252,555 19.52 Y 5.1.6) C875 FIN MORTAR CTG M24 2025 FLEXIBLE CONCEPTS / ELKHART, IN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 63,688 26.85 Y 2026 TBD / TBD C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 24,663 471.75 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Oct 2026 Oct 2026 13,949 476.30 Y 2022 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2022 May 2026 61,790 124.23 Y 2023 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2023 Nov 2026 72,370 126.71 Y 2024 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND, ARSENAL IL May 2024 Nov 2027 36,309 169.79 Y 2025 DAY & ZIMMERMANN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2028 49,251 205.74 Y 2024 L-3 FUZING & ORDNANCE SYSTEMS, INC. / CINCINATTI, OH C / FFP PICATINNY ARSENAL, NJ Mar 2024 Mar 2026 37,398 240.80 Y 2025 L-3 FUZING & ORDNANCE SYSTEMS, INC. / CINCINATTI, OH C / FFP PICATINNY ARSENAL, NJ Mar 2025 Mar 2027 49,251 47.50 Y 2024 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ ROCK ISLAND, ARSENAL IL Mar 2024 Sep 2025 37,398 22.13 Y 2025 NAMMO POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 49,251 47.50 Y 2024 GENERAL DYNAMICS OTS / MARION, IL. C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2024 Sep 2025 149,593 24.94 Y Cost Elements (†) 3.1.9) BA44 Complete Round 4.1.1) C870 Complete Round (†) 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) (†) 5.1.4) C875 IGN CTG M299 5.1.7) C875 Complete Round (†) 5.1.7) C875 Complete Round (†) 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) (†) 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) (†) 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) (†) 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) (†) (†) 6.1.2) CA63 FUZE PD, M783 (†) 6.1.2) CA63 FUZE PD, M783 6.1.3) CA63 IGN CTG M299 6.1.3) CA63 IGN CTG M299 6.1.4) CA63 CHG PROP 81MM M220 LI 1085 - Mortars Navy Location of PCO UNCLASSIFIED Page 11 of 25 Award Date Date of First Delivery P-1 Line #17 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 231 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 O O C Cost Elements Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) Contractor and Location 6.1.4) CA63 CHG PROP 81MM M220 2025 AMERICAN ORDNANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 175,187 49.88 Y 6.1.5) CA63 FIN MORTAR CTG M24 2024 FLEXIBLE CONCEPTS / ELKHART, IN C / IDIQ ROCK ISLAND, ARSENAL IL Mar 2024 Sep 2025 37,398 16.95 Y 6.1.5) CA63 FIN MORTAR CTG M24 2025 FLEXIBLE CONCEPTS / ELKHART, IN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 49,251 26.90 Y 6.1.6) CA63 PBXW-12 BULK EXPLOSIVE 2024 BAE ORDNANCE SYSTEMS / KINGSPORT, TN C / IDIQ ROCK ISLAND, ARSENAL IL Mar 2024 Sep 2025 4,258 100.10 Y 6.1.6) CA63 PBXW-12 BULK EXPLOSIVE 2025 BAE ORDNANCE SYSTEMS / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 5,012 102.21 Y 6.1.7) CA63 EXPLOSIVE FILL IMX-104 2024 BAE ORDNANCE SYSTEMS, INC. / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2024 Sep 2025 112,985 29.57 Y 6.1.7) CA63 EXPLOSIVE FILL IMX-104 2025 BAE ORDNANCE SYSTEMS, INC. / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2024 Apr 2026 130,259 30.20 Y 2026 DAY & ZIMMERMAN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2031 36,426 714.33 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Oct 2026 Oct 2026 118,310 1,002.57 Y 2026 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2031 2,727 1,354.57 Y 2027 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / TBD ROCK ISLAND ARSENAL May 2027 May 2032 4,961 1,381.66 Y (†) (†) 6.1.8) CA63 Complete Round (†) 7.1.1) CA66 Complete Round (†) 7.1.1) CA66 Complete Round (†) Location of PCO Item Number / Title [DODIC]: 1 / 1085 Mortars FY 6.1.8) CA63 Complete Round 2027 TBD / TBD C / TBD TBD Mar 2027 Mar 2027 1,400 2,858.01 Y 9.1.1) TRANCHE 29 BA16 COMPLETE ROUND 2025 DAY & ZIMMERMAN, INC. / PARSONS, KS C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2027 2,054 605.07 Y 9.1.2) TRANCHE 29 CA43 COMPLETE ROUND 2025 DAY & ZIMMERMAN, INC. / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2027 4,628 778.66 Y 8.1.1) CA72 Complete Round (†) P-1 Line Item Number / Title: 1085 / Mortars RFP Issue Date indicates the presence of a P-21 LI 1085 - Mortars Navy UNCLASSIFIED Page 12 of 25 P-1 Line #17 Volume 1 - 232 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 38.333 .000 38.333 38.333 1 2027 NAVY 5.889 .000 5.889 5.889 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 .000 34.267 34.267 2 2025 NAVY 74.000 .000 74.000 74.000 .000 72.168 72.168 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round (3) 4 2026 NAVY 101.935 .000 101.935 101.935 4 2027 NAVY 31.995 .000 31.995 31.995 .000 6.557 6.557 .000 61.680 61.680 4.1.1) C870 Complete Round 5 2026 (4) NAVY 6.557 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 (5) 7 2026 NAVY 24.663 .000 24.663 24.663 7 2027 NAVY 13.949 .000 13.949 13.949 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 .000 61.790 8 2023 NAVY 72.370 .000 72.370 A - - - - - - - - - - - - - - - - - 61.790 A - - - - - 8 2024 NAVY 36.309 .000 36.309 72.370 36.309 8 2025 NAVY 49.251 .000 49.251 49.251 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 .000 37.398 37.398 9 2025 NAVY 49.251 .000 49.251 49.251 6.1.8) CA63 Complete Round (6) O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 233 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2022 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 10 2026 NAVY 36.426 .000 36.426 36.426 11 2027 NAVY 118.310 .000 118.310 118.310 7.1.1) CA66 Complete Round (7) 12 2026 NAVY 2.727 .000 2.727 2.727 12 2027 NAVY 4.961 .000 4.961 4.961 .000 1.400 8.1.1) CA72 Complete Round 13 2027 NAVY (8) 1.400 1.400 O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 234 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 38.333 .000 38.333 38.333 1 2027 NAVY 5.889 .000 5.889 5.889 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 .000 34.267 2 2025 NAVY 74.000 .000 74.000 A - - - - - - - - - - - - - - - - - 34.267 A - - - - - 74.000 - - - - - 72.168 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round .000 72.168 A - - - - - - - (3) 4 2026 NAVY 101.935 .000 101.935 101.935 4 2027 NAVY 31.995 .000 31.995 31.995 .000 6.557 4.1.1) C870 Complete Round 5 2026 (4) NAVY 6.557 6.557 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 .000 61.680 A - - - - - - - - - - - - 61.680 (5) 7 2026 NAVY 24.663 .000 24.663 24.663 7 2027 NAVY 13.949 .000 13.949 13.949 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 .000 61.790 - - - - - - - - - - - - - - - - - - - - - - - - 61.790 8 2023 NAVY 72.370 .000 72.370 - - - - - - - - - - - - - - - - - - - - - - - - 72.370 8 2024 NAVY 36.309 .000 36.309 A - - - - - - - - - - - - - - - - - 36.309 8 2025 NAVY 49.251 .000 49.251 A - - - - 49.251 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 .000 37.398 9 2025 NAVY 49.251 .000 49.251 6.1.8) CA63 Complete Round A - - - - - - - - - - - - - - - - - - 37.398 A - - - - - - - 49.251 (6) O C T LI 1085 - Mortars Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 235 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 10 2026 NAVY 36.426 .000 36.426 36.426 11 2027 NAVY 118.310 .000 118.310 118.310 7.1.1) CA66 Complete Round (7) 12 2026 NAVY 2.727 .000 2.727 2.727 12 2027 NAVY 4.961 .000 4.961 4.961 .000 1.400 8.1.1) CA72 Complete Round 13 2027 NAVY (8) 1.400 1.400 O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 236 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 38.333 .000 38.333 1 2027 NAVY 5.889 .000 A - - - - - 5.889 - - - - - - - - - - - - 38.333 A.515 .510 .510 .510 .510 .510 .510 .510 .510 .510 .510 .274 .000 15.000 15.000 4.267 - - 74.000 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 .000 34.267 - - - - - - - - - - - - - - - - - - - 2 2025 NAVY 74.000 .000 74.000 - - - - - - - - - - - - - - - - - - - - - .000 - 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round .000 72.168 12.000 12.000 12.000 12.000 12.000 12.168 4 2026 NAVY 101.935 .000 101.935 4 2027 NAVY 31.995 .000 31.995 4.1.1) C870 Complete Round 5 2026 .000 (3) A - - - - - - - - - - - - - A4.029 4.023 4.023 4.023 4.023 4.023 4.023 3.828 - - - - - - - - - - - - 101.935 .000 (4) NAVY 6.557 .000 6.557 A - - - - - - - - - - - - - - - - A - - - - - - - - - 6.557 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 .000 61.680 - - - - 10.000 10.000 10.000 10.000 10.000 10.000 1.680 .000 (5) 7 2026 NAVY 24.663 .000 24.663 7 2027 NAVY 13.949 .000 13.949 - - - - - - - - - - A1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 .449 6.000 6.000 6.000 6.000 4.205 - - 24.663 .000 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 .000 61.790 - - - - - - - 6.500 5.000 5.471 4.614 6.000 6.000 8 2023 NAVY 72.370 .000 72.370 - - - - - - - - - - - - - .000 8 2024 NAVY 36.309 .000 36.309 - - - - - - - - - - - - - - - - - - - - - - - - 36.309 8 2025 NAVY 49.251 .000 49.251 - - - - - - - - - - - - - - - - - - - - - - - - 49.251 - - - - - - 7.000 7.000 7.000 7.000 7.000 7.000 7.000 M A R A P R M A Y J U N J U L A U G S E P 12.000 12.000 12.000 12.000 12.000 12.370 .000 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 .000 37.398 - - - - - 7.000 7.000 7.000 7.000 7.000 2.398 9 2025 NAVY 49.251 .000 49.251 - - - - - - - - - - - 6.1.8) CA63 Complete Round .251 (6) O C T LI 1085 - Mortars Navy .000 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 Volume 1 - 237 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 10 2026 NAVY 36.426 .000 36.426 11 2027 NAVY 118.310 .000 118.310 7.1.1) CA66 Complete Round NAVY 2.727 .000 2.727 12 2027 NAVY 4.961 .000 4.961 .000 1.400 13 2027 NAVY Calendar Year 2026 O C T D E C J A N F E B M A R A P R M A Y J U N A - J U L - Calendar Year 2027 A U G - S E P - O C T - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G - S E P - A10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 A - - 36.426 8.310 .000 - - - - - - - - - - - - - - - - - - 2.727 A - - - - - 4.961 (8) 1.400 O C T LI 1085 - Mortars Navy N O V B A L A N C E Fiscal Year 2027 (7) 12 2026 8.1.1) CA72 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 A.700 .700 M A R A P R .000 M A Y J U N J U L A U G S E P Volume 1 - 238 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2026 NAVY 38.333 .000 38.333 1 2027 NAVY 5.889 5.889 - - - - - - - 8.968 12.000 12.000 5.365 .000 .000 .000 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 2 2025 NAVY 74.000 34.267 .000 .000 .000 74.000 - - - - - - - 6.000 6.000 6.000 6.000 7.000 7.000 7.000 7.000 7.000 7.000 7.000 1.000 .000 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round 4 2026 NAVY 101.935 4 2027 NAVY 31.995 4.1.1) C870 Complete Round 5 2026 72.168 .000 .000 (3) .000 101.935 31.995 .000 .000 6.557 - - - - - - - 24.000 24.000 24.000 24.000 5.935 .000 .000 (4) NAVY 6.557 - - - - 6.557 .000 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 61.680 .000 .000 (5) 7 2026 NAVY 24.663 7 2027 NAVY 13.949 .000 24.663 13.949 - - - - - - - 12.000 12.000 .663 .000 .000 .000 .000 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 61.790 .000 8 2023 NAVY 72.370 72.370 .000 8 2024 NAVY 36.309 .000 36.309 - 8 2025 NAVY 49.251 .000 49.251 - .000 12.000 12.000 - 6.000 6.309 - - - .000 - - - - - - - - - 12.000 12.000 12.000 12.000 1.251 .000 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 37.398 .000 9 2025 NAVY 49.251 49.000 .251 6.1.8) CA63 Complete Round .000 .251 O C T LI 1085 - Mortars Navy .000 (6) N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 239 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 10 2026 NAVY 36.426 11 2027 NAVY 118.310 7.1.1) CA66 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T .000 36.426 118.310 .000 N O V - D E C - J A N - F E B - M A R - A P R - B A L A N C E Fiscal Year 2029 M A Y - J U N - J U L - Calendar Year 2029 A U G - S E P - O C T - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G - S E P - - 36.426 .000 (7) 12 2026 NAVY 2.727 .000 2.727 - - - - - - - - - - - - - - - - - - - - - - - - 2.727 12 2027 NAVY 4.961 .000 4.961 - - - - - - - - - - - - - - - - - - - - - - - - 4.961 1.400 .000 8.1.1) CA72 Complete Round 13 2027 NAVY (8) 1.400 .000 O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 240 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2026 NAVY 38.333 38.333 .000 .000 1 2027 NAVY 5.889 5.889 .000 .000 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 34.267 .000 .000 2 2025 NAVY 74.000 74.000 .000 .000 72.168 .000 .000 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round (3) 4 2026 NAVY 101.935 101.935 .000 .000 4 2027 NAVY 31.995 31.995 .000 .000 6.557 .000 .000 61.680 .000 .000 4.1.1) C870 Complete Round 5 2026 (4) NAVY 6.557 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 (5) 7 2026 NAVY 24.663 24.663 .000 .000 7 2027 NAVY 13.949 13.949 .000 .000 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 61.790 .000 .000 8 2023 NAVY 72.370 72.370 .000 .000 8 2024 NAVY 36.309 36.309 .000 .000 8 2025 NAVY 49.251 49.251 .000 .000 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 37.398 .000 .000 9 2025 NAVY 49.251 49.251 .000 .000 6.1.8) CA63 Complete Round (6) O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 241 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 10 2026 NAVY 36.426 11 2027 NAVY 118.310 7.1.1) CA66 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T .000 36.426 118.310 .000 N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - Calendar Year 2031 A U G - S E P - O C T - N O V - D E C - J A N - F E B - M A R - A P R - NAVY 2.727 .000 2.727 - - - - - - - - - - - - - - - - - 2.727 NAVY 4.961 .000 4.961 - - - - - - - - - - - - - - - - - - 1.400 .000 NAVY J U L A U G 12.000 12.000 12.000 S E P .426 .000 .000 - - - - - - 4.961 (8) 1.400 .000 O C T LI 1085 - Mortars Navy - J U N .000 12 2027 13 2027 M A Y (7) 12 2026 8.1.1) CA72 Complete Round B A L A N C E Fiscal Year 2031 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 242 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE 2.1.7) BA15 Complete Round Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2026 NAVY 38.333 38.333 .000 .000 1 2027 NAVY 5.889 5.889 .000 .000 3.1.1) BA44 LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 39268 2 2024 NAVY 34.267 34.267 .000 .000 2 2025 NAVY 74.000 74.000 .000 .000 72.168 .000 .000 3.1.7) BA44 FUZE MOFM, M734A1 Prior Years Deliveries: 73978 3 2025 NAVY 72.168 3.1.9) BA44 Complete Round (3) 4 2026 NAVY 101.935 101.935 .000 .000 4 2027 NAVY 31.995 31.995 .000 .000 6.557 .000 .000 61.680 .000 .000 4.1.1) C870 Complete Round 5 2026 (4) NAVY 6.557 5.1.1) C875 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 287568 6 2025 NAVY 5.1.7) C875 Complete Round 61.680 (5) 7 2026 NAVY 24.663 24.663 .000 .000 7 2027 NAVY 13.949 13.949 .000 .000 6.1.1) CA63 LOAD, ASSEMBLE AND PACK (LAP) Prior Years Deliveries: 21423 8 2022 NAVY 61.790 61.790 .000 .000 8 2023 NAVY 72.370 72.370 .000 .000 8 2024 NAVY 36.309 36.309 .000 .000 8 2025 NAVY 49.251 49.251 .000 .000 6.1.2) CA63 FUZE PD, M783 Prior Years Deliveries: 224224 9 2024 NAVY 37.398 37.398 .000 .000 9 2025 NAVY 49.251 49.251 .000 .000 6.1.8) CA63 Complete Round (6) O C T LI 1085 - Mortars Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 243 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 1 / 1085 Mortars Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 10 2026 NAVY 36.426 36.426 .000 .000 11 2027 NAVY 118.310 118.310 .000 .000 7.1.1) CA66 Complete Round (7) 12 2026 NAVY 2.727 2.727 .000 12 2027 NAVY 4.961 .000 4.961 1.400 .000 8.1.1) CA72 Complete Round 13 2027 NAVY .000 - - - - - - 3.000 1.961 M A Y J U N .000 (8) 1.400 .000 O C T LI 1085 - Mortars Navy - N O V D E C J A N F E B M A R A P R J U L A U G UNCLASSIFIED Page 24 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 244 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1085 / Mortars Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 1 / 1085 Mortars Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 1 TBD - TBD MAX For 2027 TBD 2 DAY & ZIMMERMAN, INC. PARSONS, KS 72,000 144,000 3 L-3 FUZING & ORDANCE SYSTEMS INC CINCINNATI, OH 72,000 144,000 4 TBD - TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 360,000 8 8 36 44 8 8 36 44 360,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TBD 5 PINE BLUFF ARSENAL PINE BLUFF, AR 61,440 61,440 96,000 5 5 24 29 5 5 24 29 6 DAY & ZIMMERMANN, INC. - PARSONS, KS 120,000 144,000 288,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 TBD - TBD TBD 8 DAY & ZIMMERMANN, INC. - PARSONS, KS 72,000 144,000 360,000 6 6 36 42 8 8 36 44 9 L-3 FUZING & ORDNANCE SYSTEMS, INC. CINCINATTI, OH 48,000 144,000 360,000 0 0 0 0 0 0 0 0 10 DAY & ZIMMERMAN, INC. PARSONS, KS 72,000 144,000 360,000 6 6 36 42 8 8 36 44 0 0 0 0 0 0 0 0 6 6 36 42 6 6 36 42 0 0 0 0 0 0 0 0 11 TBD - TBD 12 CANADIAN COMMERCIAL CORPORATION - OTTAWA, CANADA 13 TBD - TBD TBD 6,000 12,000 36,000 TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1085 - Mortars Navy UNCLASSIFIED Page 25 of 25 P-1 Line #17 Volume 1 - 245 === page 274 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 246 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 33.221 26.729 29.715 0.000 29.715 29.417 30.601 30.844 960.999 960.999 - - - - - - - - 33.221 26.729 29.715 0.000 29.715 29.417 30.601 30.844 960.999 - - - - - - - - 33.221 26.729 29.715 0.000 29.715 29.417 30.601 30.844 To FY 2031 Complete 30.951 Continuing - Continuing - 30.951 Continuing - Total - Continuing - - 30.951 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Direct Support Munitions budget supports a family of shoulder launched rockets. The AT4 Confined Space - Reduced Sensitivity (AT4CS-RS) and M72A8/A10 Fire from Enclosure (FFE) Lightweight Assault Weapon (LAW) rockets provide lightweight weapons mainly employed against and optimized to defeat light armored vehicles and other hard targets at close combat ranges. They can be employed from an enclosure or the open battlefield as assault weapons against bunkers, field fortifications, structures and other hard-point positions. Additionally, training launchers and sub-caliber practice rockets that fully simulate firing are also included. The Direct Support Munitions budget also provides the family of ammunition for the highly versatile Carl-Gustaf system, a true multi-role, man-portable, shoulder-fired weapon. The system offers various types of ammunition ranging from armor penetration and anti-personnel to ammunition for built-up areas, as well as special features including smoke and illumination. These munitions are procured via Joint Program Executive Office, Armament and Ammunition (JPEO A&A) / Single Manager for Conventional Ammunition (SMCA) contracts, who consolidate all services buys into their procurement actions. These munitions have a procurement lead-time of 24-72 months. LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 1 of 33 P-1 Line #18 Volume 1 - 247 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 1 / 120 MM, All Types P-5a P-5 2 / Rockets, All Types P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) / 1.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - - / 959.999 - / 33.221 - / 26.729 - / 29.715 - / 0.000 - / 29.715 - / 960.999 - / 33.221 - / 26.729 - / 29.715 - / 0.000 - / 29.715 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 baseline funds for the 1125 Direct Support Munitions budget support the Total Munitions Requirement (TMR), the Marine Corps' Approved Acquisition Objective. The TMR is the total number of rounds required for combat-ready forces. These funds replenish munitions expended in annual training and support deployment preparation, readiness, munitions lifecycle management and operational needs. FY 2027 Baseline Appropriation Request: $29.715M FY 2027 Baseline funding supports the procurement of several direct support munitions, including, but not limited to, the 66MM Anti-Structure Lightweight Assault Weapon (LAW) FFE Anti-Structure (AS) (DODIC HB25), the 84MM Carl-Gustaf family of ammunition, 84MM AT4CS-RS (CA30), and the 7.62MM Tracer (TR) Cartridge (A254). The increase of $2.986M from FY 2026 to FY 2027 supports the War Reserve Material Requirement, training and operational requirements in support of the Fleet Marine Force. Funding is for the procurement for the following DODICs: AC05, C385, C386, CA30, CA27, and CA36. FY 2027 Baseline funding for the engineering support in production (ESIP) of the following DODICs. Per the Joint Conventional Ammunition Policies and Procedures, ESIP is required until deliveries are complete. -DODIC CA20 CTG 84MM HE AT (HEAT). The FY 2027 funding request is $201K. -DODIC CA41 CTG 84MM ANTI-STRUCTURE MUNITION. The FY 2027 funding request is $151K. -DODIC CA51 CTG 84MM Carl Gustaf Multi-Target. The FY 2027 funding request is $251K. -DODIC HB26 ROCKET 66MM HE ANTI ARMOR LAW FFE AS. The FY 2027 funding request is $302K. This budget line includes Rockets, All types. Funding is also provided for First Destination Transportation as needed to support emergent shipments. LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 2 of 33 P-1 Line #18 Volume 1 - 248 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 120 MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.000 0.000 0.000 0.000 0.000 0.000 - - - - - - 1.000 0.000 0.000 0.000 0.000 0.000 - - - - - - 1.000 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - CA04 Ctg Mortar 120mm HE M934 Cost Recurring Cost 1.1.1) CA04 Load, Assemble, Pack 146.46 1,072 0.157 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) CA04 Shell Body 120mm HE - - 0.158 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.3) CA04 Ignition Cartridge M1020 - - 0.027 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) COMP B Type I Grade A - - 0.130 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) CA04 Propellant Charge M234A1 - - 0.094 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) CA04 Fin Assembly M31 - - 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) CA04 Fuze MOFM M734A1 - - 0.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.8) CA04 Production Engineering - - 0.062 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.9) CA04 Acceptance Testing - - 0.012 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - CA04 Ctg Mortar 120mm HE M934 Cost - - 1.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (LAP) (†) LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 3 of 33 P-1 Line #18 Volume 1 - 249 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 120 MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 1.000 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) - FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($) - Total Cost Qty (Each) ($ M) - 0.000 indicates the presence of a P-5a LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 4 of 33 P-1 Line #18 Volume 1 - 250 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 1.1.1) CA04 Load, Assemble, Pack (LAP) O O C FY Contractor and Location 2020 GENERAL DYNAMICS CANADA / CANADA LI 1125 - Direct Support Munitions Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Method/Type or Funding Vehicle C / IDIQ Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 5 of 33 Item Number / Title [DODIC]: 1 / 120 MM, All Types Award Date Date of First Delivery Mar 2020 Jul 2026 P-1 Line #18 Qty (Each) 1,072 Specs Date Unit Cost Avail Revision Now? Available ($) 146.76 RFP Issue Date Y Volume 1 - 251 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 33.221 26.729 29.715 0.000 29.715 - Gross/Weapon System Cost ($ in Millions) 959.999 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 959.999 Plus CY Advance Procurement ($ in Millions) - - - - - 33.221 26.729 29.715 0.000 29.715 - Total Obligation Authority ($ in Millions) 959.999 FY 2027 Total - - - - - 33.221 26.729 29.715 0.000 29.715 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A254 CTG 7.62MM TR ADAPTR CARL GUSTAF Cost Recurring Cost 1.1.1) A254 COMPLETE ROUND (†) 3.33 598,212 1.994 2.96 149,669 0.443 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) A254 PRODUCTION ENGINEERING - - 1.005 - - 0.030 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.999 - - 0.473 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A254 CTG 7.62MM TR ADAPTR CARL GUSTAF Cost - - 2.999 - - 0.473 - - 0.000 - - 0.000 - - 0.000 - - 0.000 14,784 24.208 4,957 6.141 1,285 6.568 1,331 6.863 - - 0.000 1,331 6.863 Hardware - C385 CTG, 84MM, SMOKE Cost Recurring Cost 2.1.1) C385 COMPLETE ROUND (†) 1,637.45 1,238.76 5,111.25 5,156.30 5,156.30 2.1.2) C385 PRODUCTION ENGINEERING - - 0.452 - - 0.833 - - 0.531 - - 0.432 - - 0.000 - - 0.432 Subtotal: Recurring Cost - - 24.660 - - 6.974 - - 7.099 - - 7.295 - - 0.000 - - 7.295 Subtotal: Hardware - C385 CTG, 84MM, SMOKE Cost - - 24.660 - - 6.974 - - 7.099 - - 7.295 - - 0.000 - - 7.295 Hardware - HA29 ROCKET 66MM HE M72A7 LAW WITH GRAZE Cost Recurring Cost LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 6 of 33 P-1 Line #18 Volume 1 - 252 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 3.1.1) HA29 COMPLETE ROUND - - 0.100 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.2) HA29 PRODUCTION ENGINEERING - - 0.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.600 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - HA29 ROCKET 66MM HE M72A7 LAW WITH GRAZE Cost - - 0.600 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.1.2) HA21 PRODUCTION ENGINEERING - - 0.615 - - 0.795 - - 1.475 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.615 - - 0.795 - - 1.475 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - HA21 ROCKET 21MM TRAINING Cost - - 2.615 - - 0.795 - - 1.475 - - 0.000 - - 0.000 - - 0.000 115 6.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - HA21 ROCKET 21MM TRAINING Cost Recurring Cost 4.1.1) HA21 COMPLETE ROUND (1) Hardware - HB25 ROCKET 66MM ANTI-STRUCTURE LAW FFE AT Cost Recurring Cost 5.1.1) HB25 COMPLETE ROUND 15,498.80 (†) 5.1.2) HB25 PRODUCTION ENGINEERING - 5.1.3) HB25 Complete Round Tranche 25 (†) 12,581.38 15,397 238.635 52,605.82 - 0.460 - - 0.024 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,278 16.079 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 255.174 - - 6.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - HB25 ROCKET 66MM ANTISTRUCTURE LAW FFE AT Cost - - 255.174 - - 6.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 24 1.082 80 3.722 - - 0.000 - - 0.000 - - 0.000 Hardware - HB26 ROCKET 66MM HE ANTI ARMOR LAW FFE AS Cost Recurring Cost 6.1.1) HB26 COMPLETE ROUND (†) (2) 12,643.58 7,090 LI 1125 - Direct Support Munitions Navy 89.643 45,084.60 46,524.78 UNCLASSIFIED Page 7 of 33 P-1 Line #18 Volume 1 - 253 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 6.1.2) PRODUCTION ENGINEERING (3) 6.1.3) HB26 COMPLETE ROUND (†) TRANCHE 25 6.1.4) HB26 COMPLETE ROUND (†) TRANCHE 26 - FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - 1.061 - - 0.028 - - 0.051 - - 0.302 - - 0.000 - - 0.302 16,413.46 104 1.707 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 16,410.00 300 4.923 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 97.334 - - 1.110 - - 3.773 - - 0.302 - - 0.000 - - 0.302 Subtotal: Hardware - HB26 ROCKET 66MM HE ANTI ARMOR LAW FFE AS Cost - - 97.334 - - 1.110 - - 3.773 - - 0.302 - - 0.000 - - 0.302 12,632 54.116 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - HX07 ROCKET, 83MM HEAA PRACTICE Cost Recurring Cost 7.1.1) HX07 COMPLETE ROUND 4,284.04 7.1.2) HX07 PRODUCTION ENGINEERING - - 3.645 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 57.761 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - HX07 ROCKET, 83MM HEAA PRACTICE Cost - - 57.761 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,543 6.081 871 4.995 3,681 12.662 - - 0.000 3,681 12.662 Hardware - CA30 ROCKET 84MM CONFINED SPACE (AT4) Cost Recurring Cost 8.1.1) CA30 COMPLETE ROUND 5,729.23 (†) (4) 8.1.2) PRODUCTION ENGINEERING 8.1.3) CA30 Complete Round Tranche 25 (†) 8.1.4) CA30 Complete 5,415.51 14,898 85.354 3,940.76 - 2.031 - - 0.688 - - 0.633 - - 0.681 - - 0.000 - - 0.681 2,385 12.916 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3,439.70 3,439.70 (†) - - 0.000 353 1.484 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 100.301 - - 8.253 - - 5.628 - - 13.343 - - 0.000 - - 13.343 Subtotal: Hardware - CA30 ROCKET 84MM CONFINED SPACE (AT4) Cost - - 100.301 - - 8.253 - - 5.628 - - 13.343 - - 0.000 - - 13.343 Round Tranche 27 4,203.96 5,734.80 Hardware - AA89 Cost Recurring Cost LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 8 of 33 P-1 Line #18 Volume 1 - 254 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 9.1.1) AA89 Complete Round - - 4.519 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 9.1.2) Production Engineering - - 0.100 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 4.619 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AA89 Cost - - 4.619 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10.1.1) AB51 Complete Round - - 3.060 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10.1.2) AB51 PRODUCTION ENGINEERING - - 0.100 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 3.160 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AB51 Cost - - 3.160 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 263 0.883 402 1.378 370 1.467 - - 0.000 370 1.467 Hardware - AB51 Cost Recurring Cost Hardware - C386 CTG, 84MM, TP 552 (MAAWS) Cost Recurring Cost 11.1.1) C386 COMPLETE ROUND (†) (5) 2,133.87 7,186 15.334 3,358.30 3,428.83 3,964.04 3,964.04 11.1.2) PRODUCTION ENGINEERING - - 0.361 - - 0.120 - - 0.113 - - 0.092 - - 0.000 - - 0.092 Subtotal: Recurring Cost - - 15.695 - - 1.003 - - 1.491 - - 1.559 - - 0.000 - - 1.559 Subtotal: Hardware - C386 CTG, 84MM, TP 552 (MAAWS) Cost - - 15.695 - - 1.003 - - 1.491 - - 1.559 - - 0.000 - - 1.559 Hardware - CA10 CTG 84MM TPT ROUND Cost Recurring Cost 12.1.1) CA10 COMPLETE ROUND - - 17.990 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 12.1.2) PRODUCTION ENGINEERING - - 1.122 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 12.1.3) ACCEPTANCE TESTING - - 0.110 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 19.222 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 9 of 33 P-1 Line #18 Volume 1 - 255 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - CA10 CTG 84MM TPT ROUND Cost Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) - 19.222 6,703 28.242 - 0.819 5,004 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 0.000 145 1.063 - - 0.148 14.328 - - Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - 0.000 - - 0.000 - - 0.000 - - 0.000 174 1.302 - - 0.000 - - 0.000 - - 0.000 - - 0.001 - - 0.201 - - 0.000 - - 0.201 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - CA20 CTG 84MM HE AT (HEAT) Cost Recurring Cost 13.1.1) CA20 COMPLETE ROUND (†) (6) 13.1.2) PRODUCTION ENGINEERING 13.1.3) CA20 Complete Round (†) Tranche 25 4,213.34 2,863.31 7,329.84 7,483.77 Subtotal: Recurring Cost - - 43.389 - - 1.211 - - 1.303 - - 0.201 - - 0.000 - - 0.201 Subtotal: Hardware - CA20 CTG 84MM HE AT (HEAT) Cost - - 43.389 - - 1.211 - - 1.303 - - 0.201 - - 0.000 - - 0.201 31,490 80.278 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - CA21 CTG 84MM HEDP Cost Recurring Cost 14.1.1) CA21 COMPLETE ROUND (†) 2,549.32 14.1.2) PRODUCTION ENGINEERING - - 1.456 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 14.1.3) ACCEPTANCE TESTING - - 0.349 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 82.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - CA21 CTG 84MM HEDP Cost - - 82.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 25,158 74.379 404 2.824 439 3.133 352 3.367 - - 0.000 352 3.367 Hardware - CA27 CTG 84MM M3 HE FFV Cost Recurring Cost 15.1.1) CA27 COMPLETE ROUND (†) (7) 2,956.48 6,989.33 7,136.11 9,564.28 9,564.28 15.1.2) PRODUCTION ENGINEERING - - 1.257 - - 0.492 - - 0.349 - - 0.218 - - 0.000 - - 0.218 15.1.3) ACCEPTANCE TESTING - - 0.329 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 10 of 33 P-1 Line #18 Volume 1 - 256 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 15.1.4) CA27 Complete Round (†) Tranche 25 Unit Cost ($) 4,702.46 FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 7,125 33.505 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 109.470 - - 3.316 - - 3.482 - - 3.585 - - 0.000 - - 3.585 Subtotal: Hardware - CA27 CTG 84MM M3 HE FFV Cost - - 109.470 - - 3.316 - - 3.482 - - 3.585 - - 0.000 - - 3.585 22,883 46.578 139 0.878 - - 0.000 174 1.523 - - 0.000 174 1.523 Hardware - CA36 CTG 84MM GUSTAF ILLUM Cost Recurring Cost 16.1.1) CA36 COMPLETE ROUND 2,035.48 (†) (8) 6,318.58 8,750.08 8,750.08 16.1.2) PRODUCTION ENGINEERING - - 2.231 - - 0.125 - - 0.000 - - 0.101 - - 0.000 - - 0.101 Subtotal: Recurring Cost - - 48.809 - - 1.003 - - 0.000 - - 1.624 - - 0.000 - - 1.624 Subtotal: Hardware - CA36 CTG 84MM GUSTAF ILLUM Cost - - 48.809 - - 1.003 - - 0.000 - - 1.624 - - 0.000 - - 1.624 101 0.883 119 1.062 - - 0.000 - - 0.000 - - 0.000 Hardware - CA41 CTG 84MM ANTI-STRUCTURE MUNITION Cost Recurring Cost 17.1.1) CA41 COMPLETE ROUND 4,251.84 (†) (9) 17.1.2) PRODUCTION ENGINEERING (10) Subtotal: Recurring Cost Subtotal: Hardware CA41 CTG 84MM ANTISTRUCTURE MUNITION Cost 11,829 50.295 8,738.86 8,922.38 - - 0.527 - - 0.120 - - 0.086 - - 0.151 - - 0.000 - - 0.151 - - 50.822 - - 1.003 - - 1.148 - - 0.151 - - 0.000 - - 0.151 - - 50.822 - - 1.003 - - 1.148 - - 0.151 - - 0.000 - - 0.151 95 0.883 129 1.224 - - 0.000 - - 0.000 - - 0.000 Hardware - CA51 CTG 84MM Carl Gustaf Multi-Target Cost Recurring Cost 18.1.1) CA51 COMPLETE ROUND 5,292.63 (†) (11) 18.1.2) CA51 PRODUCTION ENGINEERING (12) Subtotal: Recurring Cost 5,560 29.427 - - 1.412 - - 0.120 - - 0.106 - - 0.251 - - 0.000 - - 0.251 - - 30.839 - - 1.003 - - 1.330 - - 0.251 - - 0.000 - - 0.251 LI 1125 - Direct Support Munitions Navy 9,289.88 9,484.97 UNCLASSIFIED Page 11 of 33 P-1 Line #18 Volume 1 - 257 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - CA51 CTG 84MM Carl Gustaf Multi-Target Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 30.839 - - 1.003 - - 1.330 - - 0.251 - - 0.000 - - 0.251 Hardware - AC05 20MM Carl Gustaf Trainer system Cost Recurring Cost 19.1.1) AC05 COMPLETE 93.64 87,900 8.231 77.65 12,795 0.994 - - 0.000 77.65 17,575 1.365 - - 0.000 77.65 17,575 1.365 19.1.2) AC05 PRODUCTION ENGINEERING - - 1.136 - - 0.009 - - 0.000 - - 0.039 - - 0.000 - - 0.039 Subtotal: Recurring Cost - - 9.367 - - 1.003 - - 0.000 - - 1.404 - - 0.000 - - 1.404 Subtotal: Hardware - AC05 20MM Carl Gustaf Trainer system Cost - - 9.367 - - 1.003 - - 0.000 - - 1.404 - - 0.000 - - 1.404 1.080 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) (13) Hardware - L498 PERCUSSION, f/SUB-CAL ADAPTER, 84MM Cost Recurring Cost 20.1.1) L498 Complete Round 5.84 184,931 Subtotal: Recurring Cost - - 1.080 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - L498 PERCUSSION, f/SUB-CAL ADAPTER, 84MM Cost - - 1.080 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 959.999 - - 33.221 - - 26.729 - - 29.715 - - 0.000 - - 29.715 (†) indicates the presence of a P-5a Footnotes: (1) (2) (HA21 Complete Round) The funding decrease for DODIC HA21, from FY 2026 to FY 2027, is a result of the completion of all required deliveries, which fulfills the TMR for this item. (HB26 Complete Round) The funding decrease for DODIC HB26, from FY 2026 to FY 2027, reflects a planned decrease in item procurement with continued funding for production support until deliveries are complete. (3) (4) (HB26 Production Engineering) Per the JCAPP ESIP funding is required until the last round is delivered. (CA30 Complete Round) The hardware unit cost decrease for DODIC CA30 is a direct result of an increased procurement quantity, which has the advantages of economies of scale and step-ladder pricing. The total funding increase from FY 2026 to FY2027 for DODIC CA30 is required to replenish munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements and operational requirements. (5) (C386 Complete Round) The cost increase is a direct result of a reduced procurement quantity, which precludes the advantages of economies of scale and step-ladder pricing. LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 12 of 33 P-1 Line #18 Volume 1 - 258 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1125 / Direct Support Munitions ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Rockets, All Types MDAP/MAIS Code: (6) (CA20 Complete Round) The funding decrease for DODIC CA20, from FY 2026 to FY 2027, reflects a planned decrease in item procurement with continuing support for production support until deliveries are complete. (7) (8) (CA27 Complete Round) The cost increase is a direct result of a reduced procurement quantity, which precludes the advantages of economies of scale and step-ladder pricing. (CA36 Complete Round) The FY 2027 funding increase for CA36 is required to replenish munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. (9) (CA41 Complete Round) The funding decrease for DODIC CA41, from FY 2026 to FY 2027, reflects a planned decrease in item procurement with continued funding for production support until deliveries are complete. (10) (11) (CA41 Production Engineering) Per the JCAPP ESIP funding is required until the last round is delivered. (CA51 Complete Round) The funding decrease for DODIC CA51, from FY 2026 to FY 2027, reflects a planned decrease in item procurement with continuing support for production support until deliveries are complete. (12) (13) (CA51 Production Engineering) Per the JCAPP ESIP funding is required until the last round is delivered. (AC05 Complete Round) The funding increase for DODIC AC05, from FY 2026 to FY 2027, supports the training and operational requirements in support of the Fleet Marine Force. LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 13 of 33 P-1 Line #18 Volume 1 - 259 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 O O C Cost Elements (†) 1.1.1) A254 COMPLETE ROUND 2.1.1) C385 COMPLETE (†) ROUND 2.1.1) C385 COMPLETE (†) ROUND 2.1.1) C385 COMPLETE (†) ROUND 5.1.1) HB25 COMPLETE (†) ROUND 5.1.1) HB25 COMPLETE (†) ROUND 5.1.1) HB25 COMPLETE (†) ROUND 5.1.3) HB25 Complete Round Tranche 25 6.1.1) HB26 COMPLETE (†) ROUND 6.1.1) HB26 COMPLETE (†) ROUND 6.1.1) HB26 COMPLETE (†) ROUND 6.1.1) HB26 COMPLETE (†) ROUND 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 (†) 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 (†) 8.1.1) CA30 COMPLETE (†) ROUND 8.1.1) CA30 COMPLETE (†) ROUND 8.1.1) CA30 COMPLETE (†) ROUND 8.1.1) CA30 COMPLETE (†) ROUND P-1 Line Item Number / Title: 1125 / Direct Support Munitions Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Mar 2026 149,669 2.96 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Aug 2025 5,510 1,238.76 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Dec 2029 4,957 1,238.76 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Aug 2027 1,285 5,111.25 N Aug 2027 2023 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Mar 2023 Jul 2025 6,055 9,886.99 Y 2024 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Sep 2028 105 55,726.71 Y 2025 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Dec 2028 115 52,605.82 Y 2024 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 1,278 12,581.38 Y 2023 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Mar 2023 Jul 2025 1,133 9,572.36 Y 2024 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Jul 2024 Sep 2028 15 44,751.25 Y 2025 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Jul 2029 24 45,084.60 Y 2026 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 80 46,524.78 Y 2024 NAMMO Talley Defense Systems / Mesa, AZ SS / IDIQ PICATINNY ARSENAL, NJ Jul 2024 Jan 2026 104 16,413.46 N Jan 2026 2024 NAMMO Talley Defense Systems / Mesa, AZ SS / IDDQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 300 16,410.00 N Feb 2026 2023 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2023 Dec 2025 4,149 5,435.83 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 108 3,231.53 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ Picatinny Arsenal, NJ Jul 2025 Jan 2027 1,543 3,940.76 N Jan 2027 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Nov 2027 871 5,734.80 N Nov 2027 LI 1125 - Direct Support Munitions Navy Location of PCO Item Number / Title [DODIC]: 2 / Rockets, All Types UNCLASSIFIED Page 14 of 33 P-1 Line #18 RFP Issue Date Volume 1 - 260 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 8.1.1) CA30 COMPLETE (†) ROUND 8.1.3) CA30 Complete Round (†) Tranche 25 8.1.4) CA30 Complete Round (†) Tranche 27 11.1.1) C386 COMPLETE (†) ROUND 11.1.1) C386 COMPLETE (†) ROUND 11.1.1) C386 COMPLETE (†) ROUND 11.1.1) C386 COMPLETE (†) ROUND 13.1.1) CA20 COMPLETE (†) ROUND 13.1.1) CA20 COMPLETE (†) ROUND 13.1.1) CA20 COMPLETE (†) ROUND 13.1.3) CA20 Complete Round (†) Tranche 25 14.1.1) CA21 COMPLETE (†) ROUND 15.1.1) CA27 COMPLETE (†) ROUND 15.1.1) CA27 COMPLETE (†) ROUND 15.1.1) CA27 COMPLETE (†) ROUND 15.1.1) CA27 COMPLETE (†) ROUND 15.1.4) CA27 Complete Round (†) Tranche 25 O O C P-1 Line Item Number / Title: 1125 / Direct Support Munitions Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2027 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Oct 2026 Apr 2028 3,681 3,439.70 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 2,385 5,415.51 N Feb 2026 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDDQ PICATINNY ARSENAL, NJ Aug 2025 Aug 2028 353 4,203.96 N Aug 2028 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Aug 2025 676 1,380.61 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Dec 2029 263 3,358.30 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Aug 2027 402 3,428.83 N Aug 2027 2027 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Oct 2027 Oct 2028 370 3,964.04 N Oct 2028 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Aug 2025 248 4,350.03 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Dec 2029 145 7,329.84 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Aug 2027 174 7,483.77 N Aug 2027 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDDQ PICATINNY ARSENAL, NJ Aug 2024 Aug 2025 5,004 2,863.31 N Jul 2027 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Sep 2025 939 3,628.47 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Sep 2025 790 6,989.33 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Dec 2029 404 6,989.33 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Aug 2027 439 7,136.11 N Aug 2027 2027 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Oct 2026 Oct 2027 352 9,564.28 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Aug 2025 7,125 4,702.46 N LI 1125 - Direct Support Munitions Navy Location of PCO Item Number / Title [DODIC]: 2 / Rockets, All Types UNCLASSIFIED Page 15 of 33 P-1 Line #18 (Each) RFP Issue Date Aug 2023 Aug 2025 Volume 1 - 261 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 16.1.1) CA36 COMPLETE (†) ROUND 16.1.1) CA36 COMPLETE (†) ROUND 16.1.1) CA36 COMPLETE (†) ROUND 17.1.1) CA41 COMPLETE (†) ROUND 17.1.1) CA41 COMPLETE (†) ROUND 17.1.1) CA41 COMPLETE (†) ROUND 18.1.1) CA51 COMPLETE (†) ROUND 18.1.1) CA51 COMPLETE (†) ROUND 18.1.1) CA51 COMPLETE (†) ROUND 19.1.1) AC05 COMPLETE (†) ROUND 19.1.1) AC05 COMPLETE (†) ROUND (†) O O C P-1 Line Item Number / Title: 1125 / Direct Support Munitions Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 2 / Rockets, All Types Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 340 2,242.19 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 139 6,318.58 N 2027 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Oct 2026 Apr 2028 174 8,750.08 Y 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 1,049 8,738.86 N Feb 2026 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Dec 2029 101 8,738.86 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 119 8,922.38 N Sep 2027 2024 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2024 Feb 2026 824 5,239.76 Y 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Dec 2029 95 9,289.88 N Dec 2029 2026 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 129 9,484.97 N Sep 2027 2025 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Mar 2027 12,795 77.65 Y 2027 SAAB DYNAMAMICS AB / KARLSKOGA, SWEDEN SS / IDIQ PICATINNY ARSENAL, NJ Oct 2026 Oct 2028 17,575 77.65 Y (Each) RFP Issue Date Dec 2029 indicates the presence of a P-21 LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 16 of 33 P-1 Line #18 Volume 1 - 262 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) A254 COMPLETE ROUND Prior Years Deliveries: 598212 1 2025 NAVY 149.669 .000 149.669 149.669 2.1.1) C385 COMPLETE ROUND Prior Years Deliveries: 9274 2 2024 NAVY 5.510 .000 5.510 2 2025 NAVY 4.957 .000 4.957 A - - 5.510 4.957 2 2026 NAVY 1.285 .000 1.285 1.285 5.1.1) HB25 COMPLETE ROUND Prior Years Deliveries: 9237 3 2023 NAVY 6.055 .000 6.055 3 2024 NAVY .105 .000 .105 3 2025 NAVY .115 .000 .115 6.1.1) HB26 COMPLETE ROUND A - - - - - - - - - - - - - - - - - - - 6.055 A - - .105 .115 (2) Prior Years Deliveries: 5942 4 2023 NAVY 1.133 .000 1.133 4 2024 NAVY .015 .000 .015 A - - - - - - - - - - - - - - - - - - - 1.133 A - - - 4 2025 NAVY .024 .000 .024 .015 .024 4 2026 NAVY .080 .000 .080 .080 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 5 2024 NAVY .104 .000 .104 A - - - .104 A - - .300 - - 4.149 A - - 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 6 2024 NAVY .300 8.1.1) CA30 COMPLETE ROUND .000 .300 (4) Prior Years Deliveries: 10641 7 2023 NAVY 4.149 .000 4.149 7 2024 NAVY .108 .000 .108 A - - - - - - - - - - - - - - - - - 7 2025 NAVY 1.543 .000 1.543 7 2026 NAVY .871 .000 .871 .871 7 2027 NAVY 3.681 .000 3.681 3.681 .000 2.385 .108 1.543 8.1.3) CA30 Complete Round Tranche 25 8 2024 NAVY 2.385 A - - 2.385 8.1.4) CA30 Complete Round Tranche 27 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 263 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 9 2025 NAVY PROC QTY Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT .353 11.1.1) C386 COMPLETE ROUND Item Number / Title [DODIC]: 2 / Rockets, All Types .000 .353 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .353 (5) Prior Years Deliveries: 6510 10 2024 NAVY .676 .000 .676 10 2025 NAVY .263 .000 .263 .263 10 2026 NAVY .402 .000 .402 .402 10 2027 NAVY .370 .000 .370 .370 13.1.1) CA20 COMPLETE ROUND A - - .676 (6) Prior Years Deliveries: 6455 11 2024 NAVY .248 .000 .248 11 2025 NAVY .145 .000 .145 A - - .248 .145 11 2026 NAVY .174 .000 .174 .174 .000 5.004 A - - 5.004 .000 .939 A - - .939 A - - .790 13.1.3) CA20 Complete Round Tranche 25 12 2024 NAVY 5.004 (14) 14.1.1) CA21 COMPLETE ROUND Prior Years Deliveries: 30551 13 2024 NAVY .939 15.1.1) CA27 COMPLETE ROUND (7) Prior Years Deliveries: 24368 14 2024 NAVY .790 .000 .790 14 2025 NAVY .404 .000 .404 .404 14 2026 NAVY .439 .000 .439 .439 14 2027 NAVY .352 .000 .352 .352 .000 7.125 A - - 7.125 A - - .340 15.1.4) CA27 Complete Round Tranche 25 15 2024 NAVY 7.125 16.1.1) CA36 COMPLETE ROUND (8) Prior Years Deliveries: 22543 16 2024 NAVY .340 .000 .340 16 2025 NAVY .139 .000 .139 .139 16 2027 NAVY .174 .000 .174 .174 17.1.1) CA41 COMPLETE ROUND (9) O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 264 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Prior Years Deliveries: 10780 17 2024 NAVY 1.049 .000 1.049 17 2025 NAVY .101 .000 .101 .101 17 2026 NAVY .119 .000 .119 .119 18.1.1) CA51 COMPLETE ROUND A - - 1.049 (11) Prior Years Deliveries: 4736 18 2024 NAVY .824 .000 .824 18 2025 NAVY .095 .000 .095 .095 18 2026 NAVY .129 .000 .129 .129 12.795 19.1.1) AC05 COMPLETE ROUND A - - .824 (13) Prior Years Deliveries: 87900 19 2025 NAVY 12.795 .000 12.795 19 2027 NAVY 17.575 .000 17.575 17.575 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 265 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) A254 COMPLETE ROUND Prior Years Deliveries: 598212 1 2025 NAVY 149.669 .000 149.669 A - - - - - - - - - - - - 13.000 13.000 13.000 13.000 13.000 13.000 13.000 58.669 - - - - - .461 .459 .459 .459 .459 .459 .459 .459 .459 .459 .459 .459 A - - - - - - - - - - - - - - - - - - - 4.957 A - - - - - 1.285 2.1.1) C385 COMPLETE ROUND Prior Years Deliveries: 9274 2 2024 NAVY 5.510 .000 5.510 2 2025 NAVY 4.957 .000 4.957 2 2026 NAVY 1.285 .000 1.285 - - - - - .000 5.1.1) HB25 COMPLETE ROUND Prior Years Deliveries: 9237 3 2023 NAVY 6.055 .000 6.055 - - - - - - - - - .500 .500 .500 .500 .500 .500 .500 .500 .500 .500 .500 .555 3 2024 NAVY .105 .000 .105 - - - - - - - - - - - - - - - - - - - - - - - - .105 3 2025 NAVY .115 .000 .115 A - - - - - - - - - - - - - - .115 6.1.1) HB26 COMPLETE ROUND .000 (2) Prior Years Deliveries: 5942 4 2023 NAVY 1.133 .000 1.133 - - - - - - - - - .300 .300 .300 .233 4 2024 NAVY .015 .000 .015 - - - - - - - - - - - - - - - - - - - - - - - - .000 .015 4 2025 NAVY .024 .000 .024 A - - - - - - - - - - - - - - .024 4 2026 NAVY .080 .000 .080 A - - - - - - - .080 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 5 2024 NAVY .104 .000 .104 - - - - - - - - - - - - - - - .016 .008 .008 .008 .008 .008 .008 .008 .008 .024 .000 .300 - - - - - - - - - - - - - - - - .036 .024 .024 .024 .024 .024 .024 .024 .096 .699 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 6 2024 NAVY .300 8.1.1) CA30 COMPLETE ROUND (4) Prior Years Deliveries: 10641 7 2023 NAVY 4.149 .000 4.149 - - - - - - - - - - - - - - .345 .345 .345 .345 .345 .345 .345 .345 .345 .345 7 2024 NAVY .108 .000 .108 - - - - - - - - - - - - - - - - .018 - .009 .009 .009 .009 .009 .009 .036 7 2025 NAVY 1.543 .000 1.543 A - - - - - - - - - - - - - - - 1.543 7 2026 NAVY .871 .000 .871 A - - - - - 7 2027 NAVY 3.681 .000 3.681 .000 2.385 .871 3.681 8.1.3) CA30 Complete Round Tranche 25 8 2024 NAVY 2.385 - - - - - - - - - - - - - - - - .229 .196 .196 .196 .196 .196 .196 .196 F E B M A R A P R M A Y J U N J U L A U G S E P .784 8.1.4) CA30 Complete Round Tranche 27 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 33 S E P O C T N O V D E C J A N P-1 Line #18 Volume 1 - 266 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 9 2025 NAVY PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT .353 11.1.1) C386 COMPLETE ROUND Item Number / Title [DODIC]: 2 / Rockets, All Types .000 .353 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G A - - - - - - - - - - - - S E P - - .353 (5) Prior Years Deliveries: 6510 10 2024 NAVY .676 .000 .676 10 2025 NAVY .263 .000 .263 10 2026 NAVY .402 .000 .402 10 2027 NAVY .370 .000 .370 13.1.1) CA20 COMPLETE ROUND - - - - - - - - - - .060 .056 .056 .056 .056 .056 .056 .056 .056 .056 .056 .056 A - - - - - - - - - - - - - - - - - - - .000 .263 A - - - - - .402 .370 (6) Prior Years Deliveries: 6455 11 2024 NAVY .248 .000 .248 11 2025 NAVY .145 .000 .145 - - - - - - - - - - .028 .020 .020 .020 .020 .020 .020 .020 .020 .020 .020 .020 A - - - - - - - - - - - - - - - 11 2026 NAVY .174 .000 .174 .000 5.004 - - - - - - - - - - .450 .414 .414 .414 .414 .414 .414 .414 .000 .939 - - - - - - - - - - - .092 .077 .077 .077 .077 .077 - - - - - - - - - - - .075 .065 .065 .065 .065 A - - - - - - .000 .145 A - - - - - .174 .414 .414 .414 .414 .077 .077 .077 .077 .077 .077 .065 .065 .065 .065 .065 .065 .065 - - - - - - - - .404 A - - - - - .439 13.1.3) CA20 Complete Round Tranche 25 12 2024 NAVY 5.004 (14) .000 14.1.1) CA21 COMPLETE ROUND Prior Years Deliveries: 30551 13 2024 NAVY .939 15.1.1) CA27 COMPLETE ROUND .000 (7) Prior Years Deliveries: 24368 14 2024 NAVY .790 .000 .790 14 2025 NAVY .404 .000 .404 14 2026 NAVY .439 .000 .439 14 2027 NAVY .352 .000 .352 .000 7.125 - - - - - - - - - - - - - - - - - - .000 .352 15.1.4) CA27 Complete Round Tranche 25 15 2024 NAVY 7.125 16.1.1) CA36 COMPLETE ROUND - .657 .588 .588 .588 .588 .588 .588 .588 .588 .588 .588 .588 .000 - - - - - - - .032 .028 .028 .028 .028 .028 .028 .028 .112 A - - - - - - - - - - - - - - - .139 (8) Prior Years Deliveries: 22543 16 2024 NAVY .340 .000 .340 16 2025 NAVY .139 .000 .139 16 2027 NAVY .174 .000 .174 17.1.1) CA41 COMPLETE ROUND .174 (9) O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 267 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Prior Years Deliveries: 10780 17 2024 NAVY 1.049 .000 1.049 17 2025 NAVY .101 .000 .101 17 2026 NAVY .119 .000 .119 18.1.1) CA51 COMPLETE ROUND - - - - - - - - - - - - - - - - .092 .087 .087 .087 .087 .087 .087 .087 .348 A - - - - - - - - - - - - - - .101 A - - - - - - - .119 (11) Prior Years Deliveries: 4736 18 2024 NAVY .824 .000 .824 18 2025 NAVY .095 .000 .095 18 2026 NAVY .129 .000 .129 19.1.1) AC05 COMPLETE ROUND - - - - - - - - - - - - - - - - .076 .068 .068 .068 .068 .068 .068 .068 .272 A - - - - - - - - - - - - - - .095 A - - - - - - - .129 - - - - - - - 12.795 (13) Prior Years Deliveries: 87900 19 2025 NAVY 12.795 .000 12.795 19 2027 NAVY 17.575 .000 17.575 A - - - - - - - - - - - 17.575 O C T LI 1125 - Direct Support Munitions Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 268 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) A254 COMPLETE ROUND Prior Years Deliveries: 598212 1 2025 NAVY 149.669 91.000 58.669 13.000 13.000 13.000 13.000 6.669 .000 2.1.1) C385 COMPLETE ROUND Prior Years Deliveries: 9274 2 2024 NAVY 5.510 5.510 .000 2 2025 NAVY 4.957 .000 4.957 - - - - - - - - - - - - - - - - - - - - - - .000 2 2026 NAVY 1.285 .000 1.285 - - - - - - - - - - .108 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 - - 4.957 .000 5.1.1) HB25 COMPLETE ROUND Prior Years Deliveries: 9237 3 2023 NAVY 6.055 6.055 .000 3 2024 NAVY .105 .000 .105 - - - - - - - - - - - - - - - - - - - - - - - .017 .088 3 2025 NAVY .115 .000 .115 - - - - - - - - - - - - - - - - - - - - - - - - .115 6.1.1) HB26 COMPLETE ROUND .000 (2) Prior Years Deliveries: 5942 4 2023 NAVY 1.133 1.133 .000 4 2024 NAVY .015 .000 .015 - - - - - - - - - - - - - - - - - - - - - - - .004 .000 .011 4 2025 NAVY .024 .000 .024 - - - - - - - - - - - - - - - - - - - - - - - - .024 4 2026 NAVY .080 .000 .080 - - - - - - - - - - - .014 .006 .006 .006 .006 .006 .006 .006 .006 .006 .006 .006 .024 .008 .008 .008 .204 .096 .024 .024 .024 .024 .000 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 5 2024 NAVY .104 .080 .000 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 6 2024 NAVY .300 8.1.1) CA30 COMPLETE ROUND .000 (4) Prior Years Deliveries: 10641 7 2023 NAVY 4.149 3.450 .699 .345 .354 7 2024 NAVY .108 .072 .036 .009 .009 .009 .009 .000 7 2025 NAVY 1.543 .000 1.543 - - - .140 .130 .130 .130 .130 .130 .128 .125 .125 .125 .125 .125 7 2026 NAVY .871 .000 .871 - - - - - - - - - - - - - .079 .072 .072 .072 .072 .072 .072 .072 .072 .072 .072 .072 7 2027 NAVY 3.681 .000 3.681 A - - - - - - - - - - - - - - - - - - .306 .306 .306 .306 .306 .306 1.845 1.601 .784 .196 .196 .196 .196 O C T N O V D E C J A N .000 .000 8.1.3) CA30 Complete Round Tranche 25 8 2024 NAVY 2.385 .000 8.1.4) CA30 Complete Round Tranche 27 LI 1125 - Direct Support Munitions Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 269 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 9 2025 NAVY PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT .353 11.1.1) C386 COMPLETE ROUND Item Number / Title [DODIC]: 2 / Rockets, All Types .000 .353 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R A U G S E P B A L A N C E .290 Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L - - - - - - - - - - - - - - - - - - - - - - .034 .029 - - (5) Prior Years Deliveries: 6510 10 2024 NAVY .676 .676 .000 10 2025 NAVY .263 .000 .263 - - - - - - - - - - - - - - - - - - - - - - 10 2026 NAVY .402 .000 .402 - - - - - - - - - - .039 .033 .033 .033 .033 .033 .033 .033 .033 .033 .033 .033 10 2027 NAVY .370 .000 .370 A - - - - - - - - - - - - - - 13.1.1) CA20 COMPLETE ROUND .000 .263 .000 .370 (6) Prior Years Deliveries: 6455 11 2024 NAVY .248 .248 .000 11 2025 NAVY .145 .000 .145 - - - - - - - - - - - - - - - - - - - - - - .000 11 2026 NAVY .174 .000 .174 - - - - - - - - - - .025 .015 .015 .015 .015 .015 .015 .015 .015 .015 .007 .007 5.004 .000 .000 .939 .000 .000 .145 .000 13.1.3) CA20 Complete Round Tranche 25 12 2024 NAVY 5.004 (14) 14.1.1) CA21 COMPLETE ROUND Prior Years Deliveries: 30551 13 2024 NAVY .939 15.1.1) CA27 COMPLETE ROUND (7) Prior Years Deliveries: 24368 14 2024 NAVY .790 .790 .000 14 2025 NAVY .404 .000 .404 - - - - - - - - - - - - - - - - - - - - - - .000 14 2026 NAVY .439 .000 .439 - - - - - - - - - - .043 .036 .036 .036 .036 .036 .036 .036 .036 .036 .036 .036 .000 14 2027 NAVY .352 .000 .352 A - - - - - - - - - - - - .046 .036 .036 .036 .036 .036 .036 .036 .036 .018 .000 7.125 .000 - - .404 15.1.4) CA27 Complete Round Tranche 25 15 2024 NAVY 7.125 16.1.1) CA36 COMPLETE ROUND .000 (8) Prior Years Deliveries: 22543 16 2024 NAVY .340 .228 .112 .028 .028 .028 .028 16 2025 NAVY .139 .000 .139 - - - .018 .011 .011 .011 .011 .011 .011 .011 .011 .011 .011 .011 16 2027 NAVY .174 .000 .174 A - - - - - - - - - - - - - - - 17.1.1) CA41 COMPLETE ROUND .000 .000 - - - .020 .015 .015 .015 .015 .015 A P R M A Y J U N J U L A U G S E P .079 (9) O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R Volume 1 - 270 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Prior Years Deliveries: 10780 17 2024 NAVY 1.049 .701 .348 .087 .087 .087 .087 17 2025 NAVY .101 .000 .101 - - - - - - - - - - - - - - - - - - - - - - - 17 2026 NAVY .119 .000 .119 - - - - - - - - - - - .020 .009 .009 .009 .009 .009 .009 .009 .009 .009 .009 .009 18.1.1) CA51 COMPLETE ROUND .000 - .101 .000 (11) Prior Years Deliveries: 4736 18 2024 NAVY .824 .552 .272 .068 .068 .068 .068 18 2025 NAVY .095 .000 .095 - - - - - - - - - - - - - - - - - - - - - - - 18 2026 NAVY .129 .000 .129 - - - - - - - - - - - .019 .010 .010 .010 .010 .010 .010 .010 .010 .010 .010 .010 - - - - - - - - - - - 19.1.1) AC05 COMPLETE ROUND .000 - .095 .000 (13) Prior Years Deliveries: 87900 19 2025 NAVY 12.795 .000 12.795 - - - - - 2.000 2.000 2.000 2.000 2.000 2.000 .795 19 2027 NAVY 17.575 .000 17.575 A - - - - - - - - - - - - O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 33 S E P .000 O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G - 17.575 S E P Volume 1 - 271 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) A254 COMPLETE ROUND Prior Years Deliveries: 598212 1 2025 NAVY 149.669 149.669 .000 .000 2.1.1) C385 COMPLETE ROUND Prior Years Deliveries: 9274 2 2024 NAVY 5.510 5.510 .000 2 2025 NAVY 4.957 .000 4.957 2 2026 NAVY 1.285 1.285 .000 .000 - - - - - - - - - - - - - - .414 .413 .413 .413 .413 .413 .413 .413 .413 .413 .826 .000 5.1.1) HB25 COMPLETE ROUND Prior Years Deliveries: 9237 3 2023 NAVY 6.055 6.055 .000 3 2024 NAVY .105 .017 .088 .008 .008 .008 .008 .008 .008 .008 .008 .008 .008 .008 3 2025 NAVY .115 .000 .115 - - .018 .009 .009 .009 .009 .009 .009 .007 .009 6.1.1) HB26 COMPLETE ROUND .000 .000 .009 .009 .009 .000 (2) Prior Years Deliveries: 5942 4 2023 NAVY 1.133 1.133 .000 4 2024 NAVY .015 .004 .011 .001 .001 .001 .001 .001 .001 .001 .001 .001 .001 .001 .000 4 2025 NAVY .024 .000 .024 - - - - - - - - - .002 .002 4 2026 NAVY .080 .080 .000 .000 .000 .000 .300 .000 .000 .000 .002 .002 .002 .002 .002 .002 .002 .002 .002 .002 .000 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 5 2024 NAVY .104 .104 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 6 2024 NAVY .300 8.1.1) CA30 COMPLETE ROUND (4) Prior Years Deliveries: 10641 7 2023 NAVY 4.149 4.149 .000 .000 7 2024 NAVY .108 .108 .000 .000 7 2025 NAVY 1.543 1.543 .000 7 2026 NAVY .871 .799 .072 .072 7 2027 NAVY 3.681 1.836 1.845 .306 2.385 .000 .000 .000 .306 .306 .306 .306 .315 .000 8.1.3) CA30 Complete Round Tranche 25 8 2024 NAVY 2.385 .000 8.1.4) CA30 Complete Round Tranche 27 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 272 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 9 2025 NAVY PROC QTY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT .353 11.1.1) C386 COMPLETE ROUND Item Number / Title [DODIC]: 2 / Rockets, All Types .063 .290 Fiscal Year 2030 Calendar Year 2029 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T .029 .029 .029 .029 .029 .029 .029 .029 .029 .029 - - - - - - - - - - - - .031 .031 .031 .031 .031 .031 .031 .031 .031 .031 .031 .029 - - - - - - - - - - - - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E .000 (5) Prior Years Deliveries: 6510 10 2024 NAVY .676 .676 .000 10 2025 NAVY .263 .000 .263 10 2026 NAVY .402 .402 .000 10 2027 NAVY .370 .000 .370 13.1.1) CA20 COMPLETE ROUND .000 - - .032 .021 .021 .021 .021 .021 .021 .021 .021 .021 .042 .000 .000 (6) Prior Years Deliveries: 6455 11 2024 NAVY .248 .248 .000 11 2025 NAVY .145 .000 .145 .000 11 2026 NAVY .174 .174 .000 .000 5.004 .000 .000 .939 .000 .000 - - .013 .012 .012 .012 .012 .012 .012 .012 .012 .012 .024 13.1.3) CA20 Complete Round Tranche 25 12 2024 NAVY 5.004 (14) 14.1.1) CA21 COMPLETE ROUND Prior Years Deliveries: 30551 13 2024 NAVY .939 15.1.1) CA27 COMPLETE ROUND (7) Prior Years Deliveries: 24368 14 2024 NAVY .790 .790 .000 14 2025 NAVY .404 .000 .404 .000 14 2026 NAVY .439 .439 .000 .000 14 2027 NAVY .352 .352 .000 .000 7.125 .000 .000 .000 - - - - - - - - - - - - - - .041 .033 .033 .033 .033 .033 .033 .033 .033 .033 .066 15.1.4) CA27 Complete Round Tranche 25 15 2024 NAVY 7.125 16.1.1) CA36 COMPLETE ROUND (8) Prior Years Deliveries: 22543 16 2024 NAVY .340 .340 .000 16 2025 NAVY .139 .139 .000 16 2027 NAVY .174 .095 .079 17.1.1) CA41 COMPLETE ROUND .000 .015 .015 .015 .015 .015 .004 O C T N O V D E C J A N F E B M A R .000 (9) LI 1125 - Direct Support Munitions Navy A P R M A Y J U N J U L A U G UNCLASSIFIED Page 27 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 273 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .013 .008 .008 .008 .008 .008 .008 .008 .008 .008 B A L A N C E Prior Years Deliveries: 10780 17 2024 NAVY 1.049 1.049 .000 17 2025 NAVY .101 .000 .101 17 2026 NAVY .119 .119 .000 18.1.1) CA51 COMPLETE ROUND .000 - - - - - - - - - - - - - - .016 .000 (11) Prior Years Deliveries: 4736 18 2024 NAVY .824 .824 .000 18 2025 NAVY .095 .000 .095 18 2026 NAVY .129 .129 .000 12.795 .000 19.1.1) AC05 COMPLETE ROUND .000 - - - - - - - - - - - - - - .018 .007 .007 .007 .007 .007 .007 .007 .007 .007 .014 .000 (13) Prior Years Deliveries: 87900 19 2025 NAVY 12.795 19 2027 NAVY 17.575 .000 17.575 LI 1125 - Direct Support Munitions Navy .000 1.603 1.452 1.452 1.452 1.452 1.452 1.452 1.452 1.452 1.452 1.452 1.452 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P UNCLASSIFIED Page 28 of 33 .000 O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 274 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) A254 COMPLETE ROUND Prior Years Deliveries: 598212 1 2025 NAVY 149.669 149.669 .000 .000 2.1.1) C385 COMPLETE ROUND Prior Years Deliveries: 9274 2 2024 NAVY 5.510 5.510 .000 2 2025 NAVY 4.957 4.131 .826 .000 2 2026 NAVY 1.285 1.285 .000 .000 .413 .413 .000 5.1.1) HB25 COMPLETE ROUND Prior Years Deliveries: 9237 3 2023 NAVY 6.055 6.055 .000 .000 3 2024 NAVY .105 .105 .000 .000 3 2025 NAVY .115 .115 .000 .000 6.1.1) HB26 COMPLETE ROUND (2) Prior Years Deliveries: 5942 4 2023 NAVY 1.133 1.133 .000 .000 4 2024 NAVY .015 .015 .000 .000 4 2025 NAVY .024 .024 .000 .000 4 2026 NAVY .080 .080 .000 .000 .000 .000 .300 .000 .000 6.1.3) HB26 COMPLETE ROUND TRANCHE 25 5 2024 NAVY .104 .104 6.1.4) HB26 COMPLETE ROUND TRANCHE 26 6 2024 NAVY .300 8.1.1) CA30 COMPLETE ROUND (4) Prior Years Deliveries: 10641 7 2023 NAVY 4.149 4.149 .000 .000 7 2024 NAVY .108 .108 .000 .000 7 2025 NAVY 1.543 1.543 .000 .000 7 2026 NAVY .871 .871 .000 .000 7 2027 NAVY 3.681 3.681 .000 .000 2.385 .000 .000 8.1.3) CA30 Complete Round Tranche 25 8 2024 NAVY 2.385 8.1.4) CA30 Complete Round Tranche 27 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 275 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 9 2025 NAVY PROC QTY Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT .353 11.1.1) C386 COMPLETE ROUND Item Number / Title [DODIC]: 2 / Rockets, All Types .353 .000 Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E .000 (5) Prior Years Deliveries: 6510 10 2024 NAVY .676 .676 .000 10 2025 NAVY .263 .221 .042 10 2026 NAVY .402 .402 .000 .000 10 2027 NAVY .370 .370 .000 .000 13.1.1) CA20 COMPLETE ROUND .000 .021 .021 .000 (6) Prior Years Deliveries: 6455 11 2024 NAVY .248 .248 .000 11 2025 NAVY .145 .121 .024 .000 11 2026 NAVY .174 .174 .000 .000 5.004 .000 .000 .939 .000 .000 .012 .012 .000 13.1.3) CA20 Complete Round Tranche 25 12 2024 NAVY 5.004 (14) 14.1.1) CA21 COMPLETE ROUND Prior Years Deliveries: 30551 13 2024 NAVY .939 15.1.1) CA27 COMPLETE ROUND (7) Prior Years Deliveries: 24368 14 2024 NAVY .790 .790 .000 14 2025 NAVY .404 .338 .066 .000 14 2026 NAVY .439 .439 .000 .000 14 2027 NAVY .352 .352 .000 .000 7.125 .000 .000 .033 .033 .000 15.1.4) CA27 Complete Round Tranche 25 15 2024 NAVY 7.125 16.1.1) CA36 COMPLETE ROUND (8) Prior Years Deliveries: 22543 16 2024 NAVY .340 .340 .000 .000 16 2025 NAVY .139 .139 .000 .000 16 2027 NAVY .174 .174 .000 .000 17.1.1) CA41 COMPLETE ROUND (9) O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 30 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 276 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Rockets, All Types Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V .008 .008 D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Prior Years Deliveries: 10780 17 2024 NAVY 1.049 1.049 .000 17 2025 NAVY .101 .085 .016 17 2026 NAVY .119 .119 .000 18.1.1) CA51 COMPLETE ROUND .000 .000 .000 (11) Prior Years Deliveries: 4736 18 2024 NAVY .824 .824 .000 18 2025 NAVY .095 .081 .014 18 2026 NAVY .129 .129 .000 .000 .000 19.1.1) AC05 COMPLETE ROUND .000 .007 .007 .000 (13) Prior Years Deliveries: 87900 19 2025 NAVY 12.795 12.795 .000 19 2027 NAVY 17.575 17.575 .000 .000 O C T LI 1125 - Direct Support Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 31 of 33 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 277 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1125 / Direct Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 2 / Rockets, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 100,000 300,000 500,000 8 8 15 23 6 6 12 18 2 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 12 18 3 NAMMO Talley Defense Systems - Mesa, AZ 5,000 10,000 20,000 12 12 24 36 8 6 18 24 4 NAMMO Talley Defense Systems - Mesa, AZ 5,000 10,000 20,000 12 12 24 36 8 6 18 24 5 NAMMO Talley Defense Systems - Mesa, AZ 60,000 120,000 240,000 12 12 24 36 8 6 18 24 6 NAMMO Talley Defense Systems - Mesa, AZ 60,000 120,000 240,000 12 12 24 36 8 8 18 26 7 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 500 5,000 12,000 8 8 24 32 6 6 18 24 8 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 6,000 60,000 120,000 8 8 24 32 6 6 18 24 9 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 6 60 535 8 8 24 32 6 6 18 24 10 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 12 18 11 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 12 18 12 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 120,000 360,000 600,000 8 8 15 23 6 6 12 18 13 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 12 18 14 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 12 18 15 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 120,000 360,000 600,000 8 8 15 23 6 6 12 18 16 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 15 23 6 6 18 24 17 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 24 32 6 6 18 24 18 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 10,000 30,000 50,000 8 8 24 32 6 6 18 24 19 SAAB DYNAMAMICS AB KARLSKOGA, SWEDEN 120,000 360,000 600,000 8 8 15 23 6 6 24 30 LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 32 of 33 P-1 Line #18 Volume 1 - 278 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1125 / Direct Support Munitions Item Number / Title [DODIC]: 2 / Rockets, All Types "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (14) 414 LI 1125 - Direct Support Munitions Navy UNCLASSIFIED Page 33 of 33 P-1 Line #18 Volume 1 - 279 === page 308 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 280 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 600.561 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 600.561 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 600.561 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 280.718 280.718 280.718 164.083 164.083 164.083 142.179 - 0.000 - 142.179 - 0.000 - 142.179 0.000 142.179 142.179 142.179 169.356 169.356 169.356 212.038 212.038 212.038 278.591 278.591 278.591 To FY 2031 Complete 310.137 310.137 310.137 Total - 2,157.663 - 2,157.663 - 2,157.663 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The 1350 Infantry Weapons Ammunition budget procures and provides the Fleet Marine Force with essential small- and medium-caliber ammunition. This ammunition is critical to maintaining Marine Corps readiness, as it enables Marines to train effectively and remain prepared to fight. The budget is comprehensive, with dedicated funding for First Destination Transportation, as needed, to support programmatic goals and ensure the timely delivery of munitions, which directly supports readiness objectives. The small-caliber ammunition portfolio covers all conventional types: 5.56mm, 7.62mm, 9mm, 6.5mm, 10- and 12-gauge, .22, .30, .38, .40, .45, .300, .338, and .50 caliber rounds. These munitions support many service weapons. The 5.56mm cartridge feeds the M16 Rifle, M4 Carbine, and M249 Squad Automatic Weapon (SAW). The 7.62mm cartridge feeds the M240 Machine Gun, M24 Sniper Weapon System, M110 Semi-automatic Sniper System, and M14 Rifle. Service pistols like the M9, M17, and M18 use the 9mm cartridge. Specialized platforms use the .300 cartridge in the M2010 Enhanced Sniper Rifle and the .50 cartridge in the M2A1 Machine Gun and M107 Sniper Rifle. This exhibit includes suitable substitutes, like-items, and legacy items. The medium-caliber ammunition portfolio includes 20mm, 25mm, 30mm, and 40mm rounds. These munitions deliver high lethality against point and area targets from handheld, crew-served, and ground-platform weapons, supporting operational readiness. The group includes armor-piercing, high-explosive, smoke, illumination, training, and anti-personnel cartridges to defeat light armor, materiel, and personnel, keeping units prepared for diverse missions. The procurement process for this portfolio maximizes efficiency. The Joint Program Executive Office, Armament and Ammunition (JPEO A&A), via the Single Manager for Conventional Ammunition (SMCA), which consolidates all service purchases. The Product Manager for Ammunition manages non-SMCA items internally, with support from Naval Surface Warfare Center (NSWC) Corona, Crane, or Dahlgren. SMCA or an NSWC provides pricing for each contract. A key budget impact is the long procurement lead time for small- and medium-caliber ammunition, which ranges from 12 months to 6 years. These extended timelines can lead to funding gaps and inventory shortages if not carefully managed. Ensuring consistent, predictable funding is critical to maintaining supply continuity and preventing gaps that could compromise Marine readiness. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 1 of 55 P-1 Line #19 Volume 1 - 281 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / SMALL ARMS AMMUNITION, 9MM, All Types P-5a / 6.373 - / 11.882 - / 13.272 - / 3.815 - / 0.000 - P-5 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types P-5a - / 221.451 - / 42.183 - / 21.742 - / 3.129 - / 0.000 - / 3.129 P-5 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types P-5a, P-21 - / 53.865 - / 28.335 - / 20.999 - / 21.689 - / 0.000 - / 21.689 P-5 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types P-5a, P-21 - / 82.339 - / 52.281 - / 7.143 - / 11.620 - / 0.000 - / 11.620 P-5 5 / SMALL ARMS AMMUNITION, All Other Types P-5a, P-21 - / 8.718 - / 24.040 - / 16.475 - / 13.826 - / 0.000 - / 13.826 P-5 6 / MEDIUM CALIBER, 25MM, All Types P-5a - / 49.546 - / 5.955 - / 4.958 - / 3.760 - / 0.000 - / 3.760 P-5 7 / MEDIUM CALIBER, 30MM, All Types P-5a, P-21 - / 17.656 - / 22.297 - / 60.165 - / 54.421 - / 0.000 - / 54.421 P-5 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types P-5a, P-21 - / 160.613 - / 74.330 - / 19.329 - / 29.919 - / 0.000 - / 29.919 P-5 9 / 1350 DIRECT COLLECTION FMS CASE / 0.000 - / 19.415 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost / 600.561 - / 280.718 / 142.179 - / 0.000 - - - / 164.083 - - / 3.815 / 0.000 / 142.179 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal Year 2027 Baseline Appropriation Request: $142.179M The FY 2027 baseline funds for the 1350 Infantry Weapons Ammunition budget support the Total Munitions Requirement (TMR). The TMR is the total number of rounds required for combat-ready forces. These funds replenish munitions expended throughout the year. They also support training, deployment preparation, readiness, munitions lifecycle management, testing, and operational needs. The TMR identifies War Reserve Munition Requirements (WRMR), which are critical for maintaining a reserve for contingencies. It also covers operational, training, and testing requirements. The $21.904M budget decrease from FY 2026 to FY 2027 is due to multiple TMR changes. FY 2027 TMR changes include realigning funds to six munitions not previously included in the FY26 1350 budget line: A111, AA40, AA90, AC36, AC37, and B542. The changes also remove funding for four munitions previously covered in the FY26 1350 budget line: A059, A576, A986, and AB51. There are also significant funding decreases for AA89, AC97, and DWGW. Price increases affecting the budget are identified in the appropriate lines. Funding is also provided for First Destination Transportation as needed to support emergent shipments. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 2 of 55 P-1 Line #19 Volume 1 - 282 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SMALL ARMS AMMUNITION, 9MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 6.373 11.882 13.272 3.815 0.000 3.815 - - - - - - 6.373 11.882 13.272 3.815 0.000 3.815 - - - - - - 6.373 11.882 13.272 3.815 0.000 3.815 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A363 - CTG, 9MM BALL M882 Cost Recurring Cost 1.1.1) A363 - Total Program Unit Cost - - 0.307 - - 0.314 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.307 - - 0.314 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A363 CTG, 9MM BALL M882 Cost - - 0.307 - - 0.314 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.170 0.26 0.066 0.27 0.068 0.28 0.202 - - 0.000 0.28 Hardware - AA16 - CTG, 9MM FRANGIBLE MK254 MOD 0 Cost Recurring Cost 2.1.1) AA16 - Total Program Unit Cost (†) (1) 1.02 166,666 253,846 251,851 721,428 721,428 0.202 Subtotal: Recurring Cost - - 0.170 - - 0.066 - - 0.068 - - 0.202 - - 0.000 - - 0.202 Subtotal: Hardware - AA16 - CTG, 9MM FRANGIBLE MK254 MOD 0 Cost - - 0.170 - - 0.066 - - 0.068 - - 0.202 - - 0.000 - - 0.202 Hardware - AC07 - CTG, 9MM, BLANK, MK331 MOD0 Cost Recurring Cost 3.1.1) AC07 -Total Program Unit Cost - - 0.783 - - 0.120 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.783 - - 0.120 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 3 of 55 P-1 Line #19 Volume 1 - 283 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SMALL ARMS AMMUNITION, 9MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware - AC07 CTG, 9MM, BLANK, MK331 MOD0 Cost Qty (Each) - FY 2025 Total Cost ($ M) - Unit Cost ($) 0.783 - FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.120 - 8.417 0.30 FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 3.619 0.31 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 0.000 - - 0.000 - 1.554 - - 0.000 0.31 Total Cost Qty (Each) ($ M) - 0.000 Hardware - AC20 - CTG, 9MM BALL, MIL PACK, XM1152 Cost Recurring Cost 4.1.1) AC20 - Total (†) - - 4.198 0.26 Subtotal: Recurring Cost - - 4.198 - - 8.417 - - 3.619 - - 1.554 - - 0.000 - - 1.554 Subtotal: Hardware - AC20 - CTG, 9MM BALL, MIL PACK, XM1152 Cost - - 4.198 - - 8.417 - - 3.619 - - 1.554 - - 0.000 - - 1.554 Program Unit Cost (2) 32,373,076 12,063,333 5,012,903 5,012,903 1.554 Hardware - AC21 - CTG, 9MM SPECIAL PURPOSE XM1153 JHPT Cost Recurring Cost 5.1.1) AC21 - Total (†) - - 0.122 0.31 0.124 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.122 - - 0.124 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AC21 - CTG, 9MM SPECIAL PURPOSE XM1153 JHPT Cost - - 0.122 - - 0.124 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.399 0.59 0.408 - - 0.000 0.64 0.101 - - 0.000 0.64 Program Unit Cost 400,000 Hardware - AC36 - CTG, 9MM M1041 MARKING, BLUE Cost Recurring Cost 6.1.1) AC36 - Total Program Unit Cost (†) (3) 0.55 725,454 691,525 157,812 157,812 0.101 Subtotal: Recurring Cost - - 0.399 - - 0.408 - - 0.000 - - 0.101 - - 0.000 - - 0.101 Subtotal: Hardware AC36 - CTG, 9MM M1041 MARKING, BLUE Cost - - 0.399 - - 0.408 - - 0.000 - - 0.101 - - 0.000 - - 0.101 0.394 0.59 0.402 - - 0.000 0.64 0.101 - - 0.000 0.64 0.394 - 0.402 - - 0.000 - 0.101 - - 0.000 - Hardware - AC37 - 9MM M1041 MARKING, RED Cost Recurring Cost 7.1.1) AC37 - Total Program Unit Cost (†) (4) Subtotal: Recurring Cost 0.55 - 716,363 - LI 1350 - Infantry Weapons Ammunition Navy 681,355 - UNCLASSIFIED Page 4 of 55 157,812 - P-1 Line #19 157,812 - 0.101 0.101 Volume 1 - 284 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / SMALL ARMS AMMUNITION, 9MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware - AC37 - 9MM M1041 MARKING, RED Cost - FY 2025 Total Cost Qty (Each) ($ M) - 0.394 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.402 - 2.031 0.87 FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 9.585 0.92 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 0.101 - - 0.000 - 1.857 - - 0.000 0.92 Total Cost Qty (Each) ($ M) - 0.101 Hardware - AC97 - CTG, 9MM ENHANCED BARRIER BALL Cost Recurring Cost 8.1.1) AC97 - Total Program Unit Cost (†) - - 0.000 0.87 (5) 2,334,482 11,017,241 2,018,478 2,018,478 1.857 Subtotal: Recurring Cost - - 0.000 - - 2.031 - - 9.585 - - 1.857 - - 0.000 - - 1.857 Subtotal: Hardware - AC97 - CTG, 9MM ENHANCED BARRIER BALL Cost - - 0.000 - - 2.031 - - 9.585 - - 1.857 - - 0.000 - - 1.857 Gross/Weapon System Cost - - 6.373 - - 11.882 - - 13.272 - - 3.815 - - 0.000 - - 3.815 Remarks: Standard ammunition provides the warfighter with the necessary lethality needed to defeat the enemy while ammunition in development increases lethality, survivability, and mobility. 9mm ammunition is procured for use in the M17/M18 Modular Handgun System (†) indicates the presence of a P-5a Footnotes: (1) AA16 - Non-SMCA item. AA16 replaced A3NT and is reflected in this funding line. AA16 is required for Marine Corps training in Norway and only used in Norway. Increase in funding in FY27 and beyond is due to an increased training requirement at this geo-location. (2) AC20 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. AC20 has completely replaced A363 as the services primary 9mm training round. (3) AC36 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (4) AC37 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (5) AC97 - The total funding decrease from FY26 to FY27 demonstrates a sound acquisition strategy; the large initial buys to establish the WRMR inventory were executed in prior years, and the program is now transitioning to a less costly sustainment phase. The unit cost increase from FY26 to FY27 is due to a decrease in total funding therefore economies of scale could not be achieved. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 5 of 55 P-1 Line #19 Volume 1 - 285 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / SMALL ARMS AMMUNITION, 9MM, All Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2.1.1) AA16 - Total Program Unit Cost 2025 OLIN WINCHESTER, LLC / EAST ALTON, IL C / FFP CRANE, IN Sep 2025 Mar 2026 253,846 0.26 Y 2.1.1) AA16 - Total Program Unit Cost 2026 OLIN WINCHESTER, LLC / EAST ALTON, IL C / FFP CRANE, IN May 2026 Nov 2026 251,851 0.27 Y 2.1.1) AA16 - Total Program Unit Cost 2027 OLIN WINCHESTER, LLC / EAST ALTON, IL C / FFP CRANE, IN Oct 2026 Apr 2027 721,428 0.28 Y 4.1.1) AC20 - Total Program Unit Cost 2025 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Feb 2025 Mar 2026 32,373,076 0.26 Y 4.1.1) AC20 - Total Program Unit Cost 2026 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 12,063,333 0.30 Y 4.1.1) AC20 - Total Program Unit Cost 2027 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 5,012,903 0.31 Y 5.1.1) AC21 - Total Program Unit Cost 2025 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2025 Mar 2026 400,000 0.31 Y 6.1.1) AC36 - Total Program Unit Cost 2025 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 691,525 0.59 Y 6.1.1) AC36 - Total Program Unit Cost 2027 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2027 Jun 2028 157,812 0.64 Y 7.1.1) AC37 - Total Program Unit Cost 2025 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 681,355 0.59 Y 7.1.1) AC37 - Total Program Unit Cost 2027 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2027 Jun 2028 157,812 0.64 Y 8.1.1) AC97 - Total Program Unit Cost 2025 BLACK HILLS AMMUNITION INC / RAPID CITY, SD C / FFP FALLBROOK, CA Jun 2025 Jun 2026 2,334,482 0.87 Y 8.1.1) AC97 - Total Program Unit Cost 2026 BLACK HILLS AMMUNITION INC / RAPID CITY, SD C / FFP FALLBROOK, CA Mar 2026 Mar 2027 11,017,241 0.87 Y 8.1.1) AC97 - Total Program Unit Cost 2027 BLACK HILLS AMMUNITION INC / RAPID CITY, SD C / FFP FALLBROOK, CA Mar 2027 Mar 2028 2,018,478 0.92 Y LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 6 of 55 P-1 Line #19 RFP Issue Date Volume 1 - 286 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 42.183 21.742 3.129 0.000 3.129 - Gross/Weapon System Cost ($ in Millions) 221.451 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 221.451 Plus CY Advance Procurement ($ in Millions) - - - - - 42.183 21.742 3.129 0.000 3.129 - Total Obligation Authority ($ in Millions) 221.451 FY 2027 Total - - - - - 42.183 21.742 3.129 0.000 3.129 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A059 - CRTG, 5.56MM BALL M855 CLPD Cost Recurring Cost 1.1.1) A059 - Total Program Unit Cost (LCAAP) (†) 1.1.2) A059 - Total Program Unit Cost 1.32 104,544K 137.705 0.38 46,681,579 17.739 0.43 23,151,163 9.955 - - 0.000 - - 0.000 - - 0.000 46,681,578 17.739 0.43 23,151,162 9.955 - - 0.000 - - 0.000 - - 0.000 - - 60.030 0.38 Subtotal: Recurring Cost - - 197.735 - - 35.478 - - 19.910 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A059 CRTG, 5.56MM BALL M855 CLPD Cost - - 197.735 - - 35.478 - - 19.910 - - 0.000 - - 0.000 - - 0.000 - 0.000 0.28 1,346,429 0.377 0.27 2,194,445 0.593 - - 0.000 0.27 2,194,445 0.593 1.786 0.28 1,346,429 0.377 0.27 2,194,444 0.592 - - 0.000 0.27 2,194,444 0.592 (†) (DIV Oxford) Hardware - A080 - CRTG, 5.56MM BLANK M200 SINGLE RD Cost Recurring Cost 2.1.1) A080 - Total Program Unit Cost - - 0.000 - - - 0.000 0.23 Subtotal: Recurring Cost - - 0.000 - - 1.786 - - 0.754 - - 1.185 - - 0.000 - - 1.185 Subtotal: Hardware - A080 - CRTG, 5.56MM BLANK M200 SINGLE RD Cost - - 0.000 - - 1.786 - - 0.754 - - 1.185 - - 0.000 - - 1.185 (DIV) (†) 2.1.2) A080 - Total Program Unit Cost (LCAAP) (†) LI 1350 - Infantry Weapons Ammunition Navy 7,765,217 UNCLASSIFIED Page 7 of 55 P-1 Line #19 Volume 1 - 287 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - AA40 - CRTG, 5.56MM JACKETED FRANGIBLE SINGLE RD Cost Recurring Cost 3.1.1) AA40 - Total Program Unit Cost (†) (6) 1.54 3,139,200 4.819 0.53 3,475,471 1.842 - - 0.000 0.55 1,521,818 0.837 - - 0.000 0.55 1,521,818 0.837 Subtotal: Recurring Cost - - 4.819 - - 1.842 - - 0.000 - - 0.837 - - 0.000 - - 0.837 Subtotal: Hardware - AA40 CRTG, 5.56MM JACKETED FRANGIBLE SINGLE RD Cost - - 4.819 - - 1.842 - - 0.000 - - 0.837 - - 0.000 - - 0.837 1.023 1.76 1.078 1.93 1.107 - - 0.000 1.93 Hardware - AB67 - CTG, 5.56MM M1037, SHORT RANGE TRAINING CLIP Cost Recurring Cost 4.1.1) AB67 - Total Program Unit Cost (†) (7) 1.32 1,524,062 2.019 1.72 594,767 612,500 573,575 573,575 1.107 Subtotal: Recurring Cost - - 2.019 - - 1.023 - - 1.078 - - 1.107 - - 0.000 - - 1.107 Subtotal: Hardware - AB67 - CTG, 5.56MM M1037, SHORT RANGE TRAINING CLIP Cost - - 2.019 - - 1.023 - - 1.078 - - 1.107 - - 0.000 - - 1.107 Hardware - AC39 - CTG, 5.56MM M1042 MARKING, BLUE Cost Recurring Cost 5.1.1) AC39 - Total 10.171 0.77 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 10.171 - - 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AC39 - CTG, 5.56MM M1042 MARKING, BLUE Cost - - 10.171 - - 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Program Unit Cost (†) 3.55 2,865,600 1,301,298 Hardware - AC40 - CTG, 5.56MM M1042 MARKING, RED Cost Recurring Cost 6.1.1) AC40 - Total 414.01 16,200 6.707 0.77 Subtotal: Recurring Cost - - 6.707 - - 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AC40 - CTG, 5.56MM M1042 MARKING, RED Cost - - 6.707 - - 1.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Program Unit Cost (†) 1,301,298 Hardware - AX14 - PRIMER, PERC 12 GA SHOTGUN Cost LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 8 of 55 P-1 Line #19 Volume 1 - 288 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Recurring Cost 7.1.1) AX14 - Total Program Unit Cost (†) - - 0.000 0.25 200,000 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AX14 - PRIMER, PERC 12 GA SHOTGUN Cost - - 0.000 - - 0.050 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 221.451 - - 42.183 - - 21.742 - - 3.129 - - 0.000 - - 3.129 Remarks: Standard ammunition provides the warfighter with the necessary lethality needed to defeat the enemy while ammunition in development increases lethality, survivability, and mobility. 5.56mm is used in multiple weapon systems to include the M27 IAR Rifle, M16A4 Rifle, M4 Rifle, M4A1 Rifle, and M249 Machine Gun. [Hardware/Recurring] (A059) SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. The decrease in funding in FY27 maintains the TMR and supports other higher priority ammunition requirements that are deficient in the outyears. [Hardware/Recurring] (A080) SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. A080 is a 5.56mm Blank round that is required for use in training across all levels of USMC schools (entry, follow-on, and special) and in the Fleet Marine Force. (†) indicates the presence of a P-5a Footnotes: (6) AA40 - The FY27 funding represents a planned programmatic restart following a one-year procurement pause in FY26. This pause was a deliberate portfolio management decision to prioritize an immediate, critical operational need elsewhere within the BLI. The FY27 procurement is now required to correct the resulting inventory shortfall and ensure the on-hand balance does not fall below the validated TMR. Failure to fund this restart would formalize a critical training ammunition deficit and create a direct risk to fleet readiness. (7) AB67 - The unit cost increase from FY2026 to FY2027 is due to a curved pricing matrix and currency fluctuation risk. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 9 of 55 P-1 Line #19 Volume 1 - 289 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.1) A059 - Total Program Unit Cost (LCAAP) 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Sep 2025 Sep 2026 46,681,579 0.38 Y 1.1.1) A059 - Total Program Unit Cost (LCAAP) 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 23,151,163 0.43 Y 1.1.2) A059 - Total Program Unit Cost (DIV Oxford) 2025 OLIN-WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Sep 2025 Oct 2026 46,681,578 0.38 Y 1.1.2) A059 - Total Program Unit Cost (DIV Oxford) 2026 OLIN-WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Jun 2026 Aug 2027 23,151,162 0.43 Y 2.1.1) A080 - Total Program Unit Cost (DIV) 2026 OLIN-WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2026 Apr 2027 1,346,429 0.28 Y 2.1.1) A080 - Total Program Unit Cost (DIV) 2027 OLIN-WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2027 Apr 2028 2,194,445 0.27 Y 2.1.2) A080 - Total Program Unit Cost (LCAAP) 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Sep 2025 Oct 2026 7,765,217 0.23 Y 2.1.2) A080 - Total Program Unit Cost (LCAAP) 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Mar 2026 Apr 2027 1,346,429 0.28 Y 2.1.2) A080 - Total Program Unit Cost (LCAAP) 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Mar 2027 Apr 2028 2,194,444 0.27 Y 3.1.1) AA40 - Total Program Unit Cost 2024 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP PICATINNY ARSENAL, NJ Aug 2024 Jun 2027 3,139,200 0.51 Y 3.1.1) AA40 - Total Program Unit Cost 2025 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP PICATINNY ARSENAL, NJ Aug 2025 Aug 2027 3,475,471 0.53 Y 3.1.1) AA40 - Total Program Unit Cost 2027 VISTA OUTDOOR SALES LLC / ANOKA, MN C / FFP PICATINNY ARSENAL, NJ Aug 2027 Aug 2029 1,521,818 0.55 Y 4.1.1) AB67 - Total Program Unit Cost 2024 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2024 Aug 2025 749,253 1.34 Y 4.1.1) AB67 - Total Program Unit Cost 2025 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ May 2025 Sep 2026 594,767 1.72 Y 4.1.1) AB67 - Total Program Unit Cost 2026 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2026 Aug 2027 612,500 1.76 Y 4.1.1) AB67 - Total Program Unit Cost 2027 CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2027 Aug 2028 573,575 1.93 Y 5.1.1) AC39 - Total Program Unit Cost 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UK C / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 1,301,298 0.77 Y 6.1.1) AC40 - Total Program Unit Cost 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UK SS / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 1,301,298 0.77 Y 7.1.1) AX14 - Total Program Unit Cost 2025 TBD / TBD C / TBD Rock Island Arsenal, IL Sep 2026 Sep 2027 200,000 0.25 Y LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 10 of 55 P-1 Line #19 RFP Issue Date Volume 1 - 290 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 LI 1350 - Infantry Weapons Ammunition Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition UNCLASSIFIED Page 11 of 55 Item Number / Title [DODIC]: 2 / SMALL ARMS AMMUNITION, 5.56MM, All Types P-1 Line #19 Volume 1 - 291 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 53.865 28.335 20.999 21.689 0.000 21.689 - - - - - - 53.865 28.335 20.999 21.689 0.000 21.689 - - - - - - 53.865 28.335 20.999 21.689 0.000 21.689 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A111 - CTG, 7.62MM BLANK M82 LINKED Cost Recurring Cost 1.1.1) A111 - Total (†) - - 0.000 - - 0.000 - - 0.000 0.68 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.000 - Subtotal: Hardware - A111 CTG, 7.62MM BLANK M82 LINKED Cost - - 0.000 - - 0.000 - - 0.000 0.263 - - Program Unit Cost (8) 864,705 0.588 - - 0.000 0.68 864,705 0.588 - 0.588 - - 0.000 - - 0.588 - - 0.588 - - 0.000 - - 0.588 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - A130 - CRTG, 7.62MM BALL M80 CLPD Cost Recurring Cost 2.1.1) A130 - Total (†) - - 0.113 0.84 Subtotal: Recurring Cost - - 0.113 - - 0.263 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A130 CRTG, 7.62MM BALL M80 CLPD Cost - - 0.113 - - 0.263 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.839 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.839 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Program Unit Cost 313,095 Hardware - A131 - Ctg, 7.62mm 4 Ball M80/1 Tracer M62 Linked Cost Recurring Cost 3.1.1) A131 - Tranche 27 (†) Subtotal: Recurring Cost - - 0.000 0.74 - - 0.000 - LI 1350 - Infantry Weapons Ammunition Navy 3,836,486 - UNCLASSIFIED Page 12 of 55 P-1 Line #19 Volume 1 - 292 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Hardware - A131 - Ctg, 7.62mm 4 Ball M80/1 Tracer M62 Linked Cost - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 3.233 0.75 FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($) 2.839 - 6.138 0.94 FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($) 0.000 - 3.621 0.96 FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 0.000 - - 0.000 - 3.661 - - 0.000 0.96 Total Cost Qty (Each) ($ M) - 0.000 Hardware - A143 - CTG, 7.62MM BALL M80 LNKD Cost Recurring Cost 4.1.1) A143 - Total Program Unit Cost (†) (9) 0.72 4,490,277 8,184,000 3,852,127 3,813,541 3,813,541 3.661 Subtotal: Recurring Cost - - 3.233 - - 6.138 - - 3.621 - - 3.661 - - 0.000 - - 3.661 Subtotal: Hardware - A143 - CTG, 7.62MM BALL M80 LNKD Cost - - 3.233 - - 6.138 - - 3.621 - - 3.661 - - 0.000 - - 3.661 16.450 0.99 13.786 1.01 13.743 - - 0.000 1.01 Hardware - A151 - CRTG, 7.62MM 4 BALL M80/1TRCR M62 Cost Recurring Cost 5.1.1) A151 - Total Program Unit Cost (†) (10) 1.71 27,638,202 47.380 0.90 18,277,777 13,925,252 13,606,930 13,606,930 13.743 Subtotal: Recurring Cost - - 47.380 - - 16.450 - - 13.786 - - 13.743 - - 0.000 - - 13.743 Subtotal: Hardware - A151 - CRTG, 7.62MM 4 BALL M80/1TRCR M62 Cost - - 47.380 - - 16.450 - - 13.786 - - 13.743 - - 0.000 - - 13.743 Hardware - AA03 - CRTG, 7.62MM AP M993 SINGLE RD Cost Recurring Cost 6.1.1) AA03 - Total Program Unit Cost - - 0.000 - - 1.611 - - 0.083 - - 0.079 - - 0.000 - - 0.079 Subtotal: Recurring Cost - - 0.000 - - 1.611 - - 0.083 - - 0.079 - - 0.000 - - 0.079 Subtotal: Hardware - AA03 - CRTG, 7.62MM AP M993 SINGLE RD Cost - - 0.000 - - 1.611 - - 0.083 - - 0.079 - - 0.000 - - 0.079 1.034 1.38 3.509 1.41 3.618 - - 0.000 1.41 Hardware - AB39 - CTG., 7.62MM, MK 316, MOD 0, BALL, LONG RANGE Cost Recurring Cost 7.1.1) AB39 - Total Program Unit Cost (†) (11) 1.18 2,653,356 3.139 1.35 765,925 2,542,753 2,565,957 2,565,957 3.618 Subtotal: Recurring Cost - - 3.139 - - 1.034 - - 3.509 - - 3.618 - - 0.000 - - 3.618 Subtotal: Hardware - AB39 - CTG., 7.62MM, MK 316, - - 3.139 - - 1.034 - - 3.509 - - 3.618 - - 0.000 - - 3.618 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 13 of 55 P-1 Line #19 Volume 1 - 293 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) MOD 0, BALL, LONG RANGE Cost Gross/Weapon System Cost - - 53.865 - - 28.335 - - 20.999 - - 21.689 - - 0.000 - - 21.689 Remarks: Standard ammunition provides the warfighter with the necessary lethality needed to defeat the enemy while ammunition in development increases lethality, survivability, and mobility. 7.62mm is used with multiple weapon systems to include M240B Machine Gun, M240 Machine Gun, and M110 Sniper Rifle. (†) indicates the presence of a P-5a Footnotes: (8) A111 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (9) A143 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (10) A151 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. A151 is the only 7.62MM ammunition that provides an overhead fire capability and is replacing A131 as the sole 7.62MM, 4-Ball/ 1- Tracer (4-1) for all 4-1 training, operational, and WRMR requirements. (11) AB39 - Non-SMCA item. Pricing provided by NSWC Crane. This is a critical requirement for the USMC and funding is set to a level that maintains the TMR in conjunction with anticipated increased annual expenditures. Updated pricing will be received when new contract awards no later than April 2026. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 14 of 55 P-1 Line #19 Volume 1 - 294 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.1) A111 - Total Program Unit Cost 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2027 Jun 2028 864,705 0.68 Y 2.1.1) A130 - Total Program Unit Cost 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Aug 2025 Mar 2026 313,095 0.84 Y 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP Independence, MO Mar 2025 Mar 2026 3,836,486 0.74 Y 4.1.1) A143 - Total Program Unit Cost 2024 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2024 Jun 2025 4,490,277 0.72 Y 4.1.1) A143 - Total Program Unit Cost 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 8,184,000 0.75 Y 4.1.1) A143 - Total Program Unit Cost 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 3,852,127 0.94 Y 4.1.1) A143 - Total Program Unit Cost 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2027 Jun 2028 3,813,541 0.96 Y 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 18,277,777 0.90 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 13,925,252 0.99 Y 2027 TO BE SELECTED / TBD C / FFP PICATINNY ARSENAL, NJ Mar 2027 Oct 2027 13,606,930 1.01 Y 7.1.1) AB39 - Total Program Unit Cost 2025 FEDERAL PREMIUM AMMUNITION / ANOKA, MN C / IDIQ CRANE, IN Jan 2026 Jan 2027 765,925 1.35 Y 7.1.1) AB39 - Total Program Unit Cost 2026 FEDERAL PREMIUM AMMUNITION / ANOKA, MN C / IDIQ CRANE, IN Jun 2026 Jun 2027 2,542,753 1.38 Y 7.1.1) AB39 - Total Program Unit Cost 2027 FEDERAL PREMIUM AMMUNITION / ANOKA, MN C / IDIQ CRANE, IN Jun 2027 Jun 2028 2,565,957 1.41 Y 3.1.1) A131 - Tranche 27 5.1.1) A151 - Total Program Unit Cost (†) 5.1.1) A151 - Total Program Unit Cost (†) 5.1.1) A151 - Total Program Unit Cost (†) O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition (†) RFP Issue Date indicates the presence of a P-21 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 15 of 55 P-1 Line #19 Volume 1 - 295 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 5.1.1) A151 - Total Program Unit Cost Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (10) Prior Years Deliveries: 27638202 1 2025 NAVY 18.278 .000 18.278 1 2026 NAVY 13.925 .000 13.925 2 2027 NAVY 13.607 .000 13.607 A - - 18.278 13.925 13.607 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 296 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 5.1.1) A151 - Total Program Unit Cost Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R A U G S E P B A L A N C E 1.160 1.160 9.283 - 13.607 Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L (10) Prior Years Deliveries: 27638202 1 2025 NAVY 18.278 .000 18.278 1 2026 NAVY 13.925 .000 13.925 2 2027 NAVY 13.607 .000 13.607 - - - - - - - - - - 1.523 1.523 1.523 1.523 1.523 1.523 1.523 1.523 1.523 1.523 1.523 1.523 A - - - - - - - - - - - - 1.160 1.160 A O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N .000 J U L A U G S E P Volume 1 - 297 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 5.1.1) A151 - Total Program Unit Cost Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (10) Prior Years Deliveries: 27638202 1 2025 NAVY 18.278 18.278 .000 1 2026 NAVY 13.925 4.642 9.283 1.160 1.160 1.160 1.160 1.160 1.160 1.160 1.160 .000 2 2027 NAVY 13.607 .000 13.607 1.134 1.134 1.134 1.134 1.134 1.134 1.134 1.134 1.134 1.134 1.134 1.134 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LI 1350 - Infantry Weapons Ammunition Navy .000 UNCLASSIFIED Page 18 of 55 .000 O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 298 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Item Number / Title [DODIC]: 3 / SMALL ARMS AMMUNITION, 7.62MM, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 9,600 166,200,000 573,600,000 6 6 12 18 6 6 12 18 2 TO BE SELECTED - TBD 9,600 166,200,000 573,600,000 6 6 7 13 6 6 7 13 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 19 of 55 P-1 Line #19 Volume 1 - 299 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 82.339 52.281 7.143 11.620 0.000 11.620 - - - - - - 82.339 52.281 7.143 11.620 0.000 11.620 - - - - - - 82.339 52.281 7.143 11.620 0.000 11.620 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A518 - CRTG, CAL .50 SLAP-T XM/M962/4 SLAP XM/M903 LNKD Cost Recurring Cost 1.1.1) A518 - Total Product Unit Cost - (†) 1.1.2) A518 - Tranche 25 (†) 25.58 176,768 0.000 23.79 4.522 - 1,022,824 24.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 4.522 - - 24.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A518 - CRTG, CAL .50 SLAP-T XM/M962/4 SLAP XM/M903 LNKD Cost - - 4.522 - - 24.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.765 2.57 4.730 2.86 2.990 2.96 3.009 - - 0.000 2.96 Hardware - A555 - CRTG, CAL .50 BALL M33 LNKD MG Cost Recurring Cost 2.1.1) A555 - Total Production Unit Cost (†) (12) 2.94 940,476 1,840,466 1,045,454 1,016,554 1,016,554 3.009 Subtotal: Recurring Cost - - 2.765 - - 4.730 - - 2.990 - - 3.009 - - 0.000 - - 3.009 Subtotal: Hardware - A555 CRTG, CAL .50 BALL M33 LNKD MG Cost - - 2.765 - - 4.730 - - 2.990 - - 3.009 - - 0.000 - - 3.009 Hardware - A576 - CRTG, CAL .50 API M8/API-T M20 LNKD AC Cost Recurring Cost LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 20 of 55 P-1 Line #19 Volume 1 - 300 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements 3.1.1) A576 - Total ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) 102.39 48,259 4.941 3.16 - - 0.000 - - - 0.000 Subtotal: Recurring Cost - - Subtotal: Hardware - A576 CRTG, CAL .50 API M8/APIT M20 LNKD AC Cost - - Production Unit Cost (†) 3.1.2) A576 - ESIP Only 3.1.3) A576 - Tranche 27 (†) FY 2026 Total Cost Qty (Each) ($ M) 2,047,151 Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 6.469 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.997 - - 0.000 - - 0.000 - - 0.000 3.50 2,950 0.010 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.941 - - 6.479 - - 0.997 - - 0.000 - - 0.000 - - 0.000 4.941 - - 6.479 - - 0.997 - - 0.000 - - 0.000 - - 0.000 Hardware - A606 - CRTG, CAL .50 MK211MOD0 SINGLE RD Cost Recurring Cost 4.1.1) A606 - Total Production Unit Cost (†) - - 0.000 11.65 515 0.006 13.85 11,696 0.162 14.57 11,393 0.166 - - 0.000 14.57 11,393 0.166 - - 0.000 13.57 44,640 0.606 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 0.612 - - 0.162 - - 0.166 - - 0.000 - - 0.166 Subtotal: Hardware A606 - CRTG, CAL .50 MK211MOD0 SINGLE RD Cost - - 0.000 - - 0.612 - - 0.162 - - 0.166 - - 0.000 - - 0.166 2.589 - - 0.004 5.84 2.931 - - 0.000 5.84 (13) 4.1.2) A606 - Taiwan (†) Reimbursement Hardware - AC14 - CTG, .50 CAL BALL, REDUCED RANGE, LINKED Cost Recurring Cost 5.1.1) AC14 - Total Production Unit Cost (†) (14) 4.33 3,633,630 15.751 5.41 478,558 501,883 501,883 2.931 Subtotal: Recurring Cost - - 15.751 - - 2.589 - - 0.004 - - 2.931 - - 0.000 - - 2.931 Subtotal: Hardware AC14 - CTG, .50 CAL BALL, REDUCED RANGE, LINKED Cost - - 15.751 - - 2.589 - - 0.004 - - 2.931 - - 0.000 - - 2.931 13.538 5.35 2.990 5.53 5.514 - - 0.000 5.53 Hardware - AC15 - CTG, .50 CAL 4 & 1 REDUCED RANGE, LINKED Cost Recurring Cost 6.1.1) AC15 - Total Production Unit Cost (15) (†) 4.69 11,596,230 54.360 LI 1350 - Infantry Weapons Ammunition Navy 5.09 2,659,724 558,878 UNCLASSIFIED Page 21 of 55 997,106 P-1 Line #19 997,106 5.514 Volume 1 - 301 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Recurring Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 54.360 - - 13.538 - - 2.990 - - 5.514 - - 0.000 - - 5.514 Subtotal: Hardware AC15 - CTG, .50 CAL 4 & 1 REDUCED RANGE, LINKED Cost - - 54.360 - - 13.538 - - 2.990 - - 5.514 - - 0.000 - - 5.514 Gross/Weapon System Cost - - 82.339 - - 52.281 - - 7.143 - - 11.620 - - 0.000 - - 11.620 Remarks: Small caliber ammunition consists of Lightweight Case, advanced armor-piercing capabilities, reduced range ammunition, one-way luminescence trace ammunition, lead free primer, all-purpose tactical cartridge, and next generation projectiles. The .50 caliber reduced range ammunition will be procured to address operational requirements in an urban environment and the ability to train on ranges where only ammunition with 7.62mm surface danger zone can be live fired. (†) indicates the presence of a P-5a Footnotes: (12) A555 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (13) A606 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (14) AC14 - The FY27 funding represents a planned programmatic restart following a one-year procurement pause in FY26. This pause was a deliberate portfolio management decision to prioritize an immediate, critical operational need elsewhere within the BLI. The FY27 procurement is now required to correct the resulting inventory shortfall and ensure the on-hand balance does not fall below the validated TMR. (15) AC15 - The increase in funding from FY26 to FY27 is required to correct the resulting inventory shortfall and ensure the on-hand balance does not fall below the validated TMR. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 22 of 55 P-1 Line #19 Volume 1 - 302 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Sep 2025 Sep 2026 1,022,824 23.79 Y 2024 TO BE SELECTED / ROCK ISLAND ARSENAL, IL C / FFP ROCK ISLAND ARSENAL Sep 2025 Sep 2026 176,768 25.58 Y 2.1.1) A555 - Total Production Unit Cost 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 1,840,466 2.57 Y 2.1.1) A555 - Total Production Unit Cost 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 1,045,454 2.86 Y 2.1.1) A555 - Total Production Unit Cost 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 1,016,554 2.96 Y 3.1.1) A576 - Total Production Unit Cost 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 2,047,151 3.16 Y 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO C / FFP Independence, MO Mar 2025 Mar 2026 2,950 3.50 Y 4.1.1) A606 - Total Production Unit Cost 2025 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 515 11.65 Y 4.1.1) A606 - Total Production Unit Cost 2026 OLIN CORPORATION WINCHESTER DIV / OXFORD, MS C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 11,696 13.85 Y 4.1.1) A606 - Total Production Unit Cost 2027 OLIN WINCHESTER, LLC / EAST ALTON, IL C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 11,393 14.57 Y 4.1.2) A606 - Taiwan Reimbursement 2025 OLIN CORPORATION / ILLINOIS C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 44,640 13.57 Y 5.1.1) AC14 - Total Production Unit Cost 2025 OCR GLOBAL, INC. / CHANTILLY, VA C / IDIQ CRANE, IN Jun 2025 Dec 2025 478,558 5.41 Y 5.1.1) AC14 - Total Production Unit Cost 2027 OCR GLOBAL, INC. / CHANTILLY, VA C / IDIQ CRANE, IN Jun 2027 Dec 2027 501,883 5.84 Y 2025 OCR GLOBAL, INC. / CHANTILLY, VA C / IDIQ CRANE, IN Jun 2025 Dec 2025 2,659,724 5.09 Y 2026 OCR GLOBAL, INC. / CHANTILLY, VA C / IDIQ CRANE, IN Jun 2026 Dec 2026 558,878 5.35 Y 2027 OCR GLOBAL, INC. / CHANTILLY, VA C / IDIQ CRANE, IN Jun 2027 Dec 2027 997,106 5.53 Y 1.1.1) A518 - Total Product Unit Cost 1.1.2) A518 - Tranche 25 3.1.3) A576 - Tranche 27 6.1.1) AC15 - Total Production Unit Cost (†) 6.1.1) AC15 - Total Production Unit Cost (†) 6.1.1) AC15 - Total Production Unit Cost (†) O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition (†) RFP Issue Date indicates the presence of a P-21 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 23 of 55 P-1 Line #19 Volume 1 - 303 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 6.1.1) AC15 - Total Production Unit Cost Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y .222 .222 .222 .222 .222 .222 J U N J U L A U G S E P .222 .222 .222 .222 .443 A - - - - .559 (15) Prior Years Deliveries: 11596230 1 2025 NAVY 2.660 .000 2.660 1 2026 NAVY .559 .000 .559 1 2027 NAVY .997 .000 .997 A - - - - - - .997 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 304 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 6.1.1) AC15 - Total Production Unit Cost Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types Fiscal Year 2028 Calendar Year 2027 O C T N O V Calendar Year 2028 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 A - - - - - - J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (15) Prior Years Deliveries: 11596230 1 2025 NAVY 2.660 2.216 .443 .222 .222 1 2026 NAVY .559 .000 .559 - - 1 2027 NAVY .997 .000 .997 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V .000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 55 S E P O C T N O V .000 .083 .083 .083 .083 .083 .083 .083 .083 .083 .083 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P P-1 Line #19 .166 Volume 1 - 305 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 6.1.1) AC15 - Total Production Unit Cost Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (15) Prior Years Deliveries: 11596230 1 2025 NAVY 2.660 2.660 .000 1 2026 NAVY .559 .559 .000 1 2027 NAVY .997 .831 .166 .000 .000 .083 .083 O C T N O V LI 1350 - Infantry Weapons Ammunition Navy .000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 306 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 4 / SMALL ARMS AMMUNITION, .50 CAL, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OCR GLOBAL, INC. CHANTILLY, VA MSR For 2027 1-8-5 For 2027 MAX For 2027 16,600 500,000 6,000,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 6 Total After Oct 1 ALT Prior to Oct 1 12 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 6 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 27 of 55 P-1 Line #19 Volume 1 - 307 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 8.718 24.040 16.475 13.826 0.000 13.826 - - - - - - 8.718 24.040 16.475 13.826 0.000 13.826 - - - - - - 8.718 24.040 16.475 13.826 0.000 13.826 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A023 - CRTG, 12 GA 1 OZ SLUG Cost Recurring Cost 1.1.1) A023 - Total Program Unit Cost (†) (16) 1.32 194,800 0.258 1.25 355,200 0.444 1.28 214,843 0.275 1.35 952,592 1.286 - - 0.000 1.35 952,592 1.286 Subtotal: Recurring Cost - - 0.258 - - 0.444 - - 0.275 - - 1.286 - - 0.000 - - 1.286 Subtotal: Hardware - A023 - CRTG, 12 GA 1 OZ SLUG Cost - - 0.258 - - 0.444 - - 0.275 - - 1.286 - - 0.000 - - 1.286 0.585 3.04 0.612 3.00 0.630 - - 0.000 3.00 Hardware - AC33 - CTG, .300 CAL NORMA MAGNUM XM1163 Cost Recurring Cost 2.1.1) AC33 - Total Program Unit Cost (†) (17) 2.87 156,200 0.448 3.04 192,434 201,315 210,000 210,000 0.630 Subtotal: Recurring Cost - - 0.448 - - 0.585 - - 0.612 - - 0.630 - - 0.000 - - 0.630 Subtotal: Hardware - AC33 - CTG, .300 CAL NORMA MAGNUM XM1163 Cost - - 0.448 - - 0.585 - - 0.612 - - 0.630 - - 0.000 - - 0.630 3.067 1.89 1.030 2.06 2.437 2.10 2.106 - - 0.000 2.10 Hardware - AC58 - CTG, 6.5 CREEDMORE Cost Recurring Cost 3.1.1) AC58 - Total Program Unit Cost (18) (†) 1.86 1,647,720 LI 1350 - Infantry Weapons Ammunition Navy 544,973 1,183,009 UNCLASSIFIED Page 28 of 55 1,002,857 P-1 Line #19 1,002,857 2.106 Volume 1 - 308 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 3.067 - - 1.030 - - 2.437 - - 2.106 - - 0.000 - - 2.106 Subtotal: Hardware - AC58 - CTG, 6.5 CREEDMORE Cost - - 3.067 - - 1.030 - - 2.437 - - 2.106 - - 0.000 - - 2.106 1.865 4.37 5.655 - - 0.000 4.37 Hardware - AC88 - .338 NORMA MAG, LINKED ISO LMMG Cost Recurring Cost 4.1.1) AC88 - Total (†) - - 0.000 - - 0.000 4.28 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 1.865 - - 5.655 - - 0.000 - - 5.655 Subtotal: Hardware - AC88 - .338 NORMA MAG, LINKED ISO LMMG Cost - - 0.000 - - 0.000 - - 1.865 - - 5.655 - - 0.000 - - 5.655 (†) - - 0.250 2.82 21.981 2.88 11.259 2.94 4.135 - - 0.000 2.94 Subtotal: Recurring Cost - - 0.250 - - 21.981 - - 11.259 - - 4.135 - - 0.000 - - 4.135 Subtotal: Hardware - AXX CTG, 6.8MM Cost - - 0.250 - - 21.981 - - 11.259 - - 4.135 - - 0.000 - - 4.135 Program Unit Cost (19) 435,747 1,294,050 1,294,050 5.655 Hardware - AXX - CTG, 6.8MM Cost Recurring Cost 5.1.1) AXX - Total Program Unit Cost (20) 7,794,680 3,909,375 1,406,462 1,406,462 4.135 Hardware - DWGW - CTG, .40 CAL MK308-0 Cost Recurring Cost 6.1.1) DWGW - Total (†) - - 0.000 - - 0.000 0.34 79,411 0.027 0.35 40,000 0.014 - - 0.000 0.35 40,000 0.014 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.027 - - 0.014 - - 0.000 - - 0.014 Subtotal: Hardware - DWGW - CTG, .40 CAL MK308-0 Cost - - 0.000 - - 0.000 - - 0.027 - - 0.014 - - 0.000 - - 0.014 Program Unit Cost (21) Hardware - DIRECT APPROPRIATION ADD Cost Non Recurring Cost 7.1.1) Direct Appropriation Add - - 4.695 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 4.695 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 29 of 55 P-1 Line #19 Volume 1 - 309 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Hardware DIRECT APPROPRIATION ADD Cost - - 4.695 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 8.718 - - 24.040 - - 16.475 - - 13.826 - - 0.000 - - 13.826 Remarks: Standard ammunition provides the warfighter with the necessary lethality needed to defeat the enemy while ammunition in development increases lethality, survivability, and mobility. Other small calibers of ammunition include items such as the .300 WinMag cartridge that is used in the M2010 Enhanced Sniper Rifle, the 6.5 Creedmoor that is used in the MK1 Mid-Range Gas Gun - Sniper, the Next Generation Squad Weapon, and more. (†) indicates the presence of a P-5a Footnotes: (16) A023 - Non-SMCA item. FY26 pricing is provided by NSWC Crane. Pricing in the outyears is estimated with a 2% increase for inflation. The increase in funding in FY27 supports bringing the TMR back to 100% due to increased expenditures in previous years. (17) AC33 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (18) AC58 - Non-SMCA item. Pricing provided by NSWC Crane. This is a new item, and the Marine Corps managed contract will be awarded no later than April 2026. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (19) AC88 - Non-SMCA item. FY26 pricing is based on FY25 SOCOM procurement and adjusted for inflation. Price per round includes all production and engineering support costs, test costs, and non-recurring costs. DODIC AC88 is a placeholder DODIC for the linked version of the .338 Norma Mag round and is a new requirement supporting the fielding of the General-Purpose Machine Gun to the Ground Combat Element of the Marine Corps. The increase in funding from FY26 to FY28 is to establishing this NEW item in the inventory and set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (20) AXX - AXX is a new addition to the TMR that supports the Next Generation Squad Weapon effort led by the United States Army and is a placeholder DODIC that will span 3 separate items: AC84 - General Purpose 6.8mm XM1186, AC86 - Reduce Range 6.8mm XM1188, and AC82 - Blank 6.8mm XM1192. SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. The reduction in funding from FY26 to FY27 is the result of a decrease in TMR quantities. (21) DWGW - Non-SMCA item. FY27 pricing is based off last known cost and estimated in the outyears with a 2% inflation. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. DWGW is a requirement for the Game Wardens across all Marine Corps Installations. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 30 of 55 P-1 Line #19 Volume 1 - 310 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements O O C Method/Type or Funding Vehicle Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.1) A023 - Total Program Unit Cost 2025 REMINGTON AMMUNITION / LONOKE, AR C / FFP Crane, IN Jun 2025 Dec 2025 355,200 1.25 Y 1.1.1) A023 - Total Program Unit Cost 2026 REMINGTON AMMUNITION / LONOKE, AR C / FFP Crane, IN Jun 2026 Dec 2026 214,843 1.28 Y 1.1.1) A023 - Total Program Unit Cost 2027 REMINGTON AMMUNITION / LONOKE, AR C / FFP Crane, IN Apr 2027 Oct 2027 952,592 1.35 Y 2.1.1) AC33 - Total Program Unit Cost 2025 SIG SAUER, INC. / NEWINGTON, NH C / FFP PICATINNY ARSENAL, NJ Jun 2025 Apr 2026 192,434 3.04 Y 2.1.1) AC33 - Total Program Unit Cost 2026 SIG SAUER, INC. / NEWINGTON, NH C / FFP PICATINNY ARSENAL, NJ Jun 2026 Mar 2027 201,315 3.04 Y 2.1.1) AC33 - Total Program Unit Cost 2027 SIG SAUER, INC. / NEWINGTON, NH C / FFP PICATINNY ARSENAL, NJ Jun 2027 Mar 2028 210,000 3.00 Y 3.1.1) AC58 - Total Program Unit Cost 2025 (22) TO BE SELECTED / CRANE, IN C / IDIQ CRANE, IN Apr 2026 Oct 2026 544,973 1.89 Y 3.1.1) AC58 - Total Program Unit Cost 2026 (23) TO BE SELECTED / CRANE, IN C / IDIQ CRANE, IN Apr 2026 Oct 2026 1,183,009 2.06 Y 2027 TO BE SELECTED / CRANE, IN C / IDIQ CRANE, IN Apr 2027 Oct 2027 1,002,857 2.10 Y 2026 TO BE SELECTED / TBD C / IDIQ Quantico, VA Jun 2027 Dec 2028 435,747 4.28 N Oct 2026 2027 TO BE SELECTED / TBD C / IDIQ Quantico, VA Jun 2027 Dec 2028 1,294,050 4.37 N Oct 2026 5.1.1) AXX - Total Program Unit Cost 2025 TO BE SELECTED / PICATINNY ARSENAL, NJ C / FFP ROCK ISLAND ARSENAL Sep 2026 Sep 2027 7,794,680 2.82 Y 5.1.1) AXX - Total Program Unit Cost 2026 TO BE SELECTED / PICATINNY ARSENAL, NJ C / FFP ROCK ISLAND ARSENAL Sep 2026 Sep 2027 3,909,375 2.88 Y 5.1.1) AXX - Total Program Unit Cost 2027 TO BE SELECTED / PICATINNY ARSENAL, NJ C / FFP ROCK ISLAND ARSENAL Apr 2027 Apr 2028 1,406,462 2.94 Y 6.1.1) DWGW - Total Program Unit Cost 2026 TO BE SELECTED / TBD C / TBD Quantico, VA Apr 2026 Oct 2026 79,411 0.34 Y 6.1.1) DWGW - Total Program Unit Cost 2027 TO BE SELECTED / TBD C / TBD Quantico, VA Apr 2027 Oct 2027 40,000 0.35 Y 3.1.1) AC58 - Total Program Unit Cost 4.1.1) AC88 - Total Program Unit Cost (†) 4.1.1) AC88 - Total Program Unit Cost (†) P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition (†) RFP Issue Date indicates the presence of a P-21 Footnotes: (22) IDIQ to be awarded via Crane in 2026. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 31 of 55 P-1 Line #19 Volume 1 - 311 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 (23) P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types IDIQ to be awarded via Crane in 2026. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 32 of 55 P-1 Line #19 Volume 1 - 312 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 4.1.1) AC88 - Total Program Unit Cost Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (19) 1 2026 NAVY .436 .000 .436 .436 1 2027 NAVY 1.294 .000 1.294 1.294 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 313 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 4.1.1) AC88 - Total Program Unit Cost Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (19) 1 2026 NAVY .436 .000 .436 A - - - - - - - - - - - - - - - - .436 1 2027 NAVY 1.294 .000 1.294 A - - - - - - - - - - - - - - - - 1.294 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 314 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 4.1.1) AC88 - Total Program Unit Cost Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V Calendar Year 2030 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (19) 1 2026 NAVY .436 .000 .436 - - .036 .036 .036 .036 .036 .036 .036 .036 .036 .036 .036 .036 1 2027 NAVY 1.294 .000 1.294 - - .116 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V O C T LI 1350 - Infantry Weapons Ammunition Navy N O V UNCLASSIFIED Page 35 of 55 .000 .000 D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 315 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Item Number / Title [DODIC]: 5 / SMALL ARMS AMMUNITION, All Other Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 TO BE SELECTED - TBD 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 18 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 36 of 55 P-1 Line #19 Volume 1 - 316 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 6 / MEDIUM CALIBER, 25MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 49.546 5.955 4.958 3.760 0.000 3.760 - - - - - - 49.546 5.955 4.958 3.760 0.000 3.760 - - - - - - 49.546 5.955 4.958 3.760 0.000 3.760 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - A940 - CRTG, 25MM TPDS-T M910 LNKD Cost Recurring Cost 1.1.1) A940 - Total Program Unit Cost - - 10.773 - - 0.000 154.49 3,226 0.498 130.37 14,420 1.880 - - 0.000 130.37 14,420 1.880 151.77 99,856 15.155 62.22 87,368 5.436 154.49 3,227 0.499 130.37 14,420 1.880 - - 0.000 130.37 14,420 1.880 Subtotal: Recurring Cost - - 25.928 - - 5.436 - - 0.997 - - 3.760 - - 0.000 - - 3.760 Subtotal: Hardware - A940 CRTG, 25MM TPDS-T M910 LNKD Cost - - 25.928 - - 5.436 - - 0.997 - - 3.760 - - 0.000 - - 3.760 (†) (GDOTS) 1.1.2) A940 - Total Program Unit Cost (†) (NGIS) Hardware - A986 - CTG 25MM APFSDS-T M919 LINKED Cost Recurring Cost 3.1.1) A986 - Total Program Unit Cost (†) (24) 435.31 54,256 23.618 435.30 1,192 0.519 477.45 8,296 3.961 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 23.618 - - 0.519 - - 3.961 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - A986 - CTG 25MM APFSDS-T M919 LINKED Cost - - 23.618 - - 0.519 - - 3.961 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 49.546 - - 5.955 - - 4.958 - - 3.760 - - 0.000 - - 3.760 Remarks: LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 37 of 55 P-1 Line #19 Volume 1 - 317 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 6 / MEDIUM CALIBER, 25MM, All Types MDAP/MAIS Code: Standard ammunition provides the Warfighter with the necessary lethality needed to defeat the enemy. Specialty cannon caliber and 40 mm cartridges provide unique capabilities for the Warfighter such as HE, airburst, marking, and illumination. 25mm is used with the M242 Bushmaster system. SMCA procured 25mm is part of a combined 20mm, 25mm, & 30mm contract. Quantity splits may be determined between two contractors in the year of execution. [Hardware/Recurring] (A940) SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. The increase in funding in FY27 and out replenishes stocks expended in training. (†) indicates the presence of a P-5a Footnotes: (24) A986 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. This is a WRMR only item. Funding is set to a level that brings the TMR back to 100% after losing inventory that exceeded its service life. This is the sole 25mm WRMR ammunition item, supporting the LAV-25. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 38 of 55 P-1 Line #19 Volume 1 - 318 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Method/Type or Funding Vehicle Item Number / Title [DODIC]: 6 / MEDIUM CALIBER, 25MM, All Types Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.1) A940 - Total Program Unit Cost (GDOTS) 2026 GENERAL DYNAMICS ORD & TAC SYSTEMS / MARION, IL C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 3,226 154.49 Y 1.1.1) A940 - Total Program Unit Cost (GDOTS) 2027 GENERAL DYNAMICS ORD & TAC SYSTEMS / MARION, IL C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 14,420 130.37 Y 1.1.2) A940 - Total Program Unit Cost (NGIS) 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP ROCK ISLAND ARSENAL Jun 2025 Sep 2026 87,368 62.22 Y 1.1.2) A940 - Total Program Unit Cost (NGIS) 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 3,227 154.49 Y 1.1.2) A940 - Total Program Unit Cost (NGIS) 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 14,420 130.37 Y 3.1.1) A986 - Total Program Unit Cost 2025 GENERAL DYNAMICS ORD & TAC SYSTEMS / MARION, IL C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 1,192 435.30 Y 3.1.1) A986 - Total Program Unit Cost 2026 GENERAL DYNAMICS ORD & TAC SYSTEMS / MARION, IL C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 8,296 477.45 Y LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 39 of 55 P-1 Line #19 (Each) RFP Issue Date Volume 1 - 319 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 17.656 22.297 60.165 54.421 0.000 54.421 - - - - - - 17.656 22.297 60.165 54.421 0.000 54.421 - - - - - - 17.656 22.297 60.165 54.421 0.000 54.421 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - AA89 - CRTG, 30MM X 173MM 1 HEI-T MK266-1/1 MPLD-T MK264-0 Cost Recurring Cost 1.1.1) AA89 - Total (†) - - 0.000 434.28 26,621 11.561 400.31 18,825 7.536 407.90 20,497 8.361 - - 0.000 407.90 20,497 8.361 Subtotal: Recurring Cost - - 0.000 - - 11.561 - - 7.536 - - 8.361 - - 0.000 - - 8.361 Subtotal: Hardware - AA89 - CRTG, 30MM X 173MM 1 HEI-T MK266-1/1 MPLD-T MK264-0 Cost - - 0.000 - - 11.561 - - 7.536 - - 8.361 - - 0.000 - - 8.361 Program Unit Cost (25) Hardware - AA90 - CTG, 30MM x 173MM TP-T MK239 MOD 0 Cost Recurring Cost 2.1.1) AA90 - Total (†) - - 0.000 - - 0.000 - - 0.000 137.48 35,357 4.861 - - 0.000 137.48 35,357 4.861 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.000 - - 4.861 - - 0.000 - - 4.861 Subtotal: Hardware - AA90 CTG, 30MM x 173MM TP-T MK239 MOD 0 Cost - - 0.000 - - 0.000 - - 0.000 - - 4.861 - - 0.000 - - 4.861 721.92 11,982 8.650 604.39 39,317 23.763 - - 0.000 - - 0.000 - - 0.000 Program Unit Cost (26) Hardware - AB51 - CRTG, 30MM X 173MM, APFSDS-T, MK258 MOD 1 Cost Recurring Cost 3.1.1) AB51 -Total Program Unit Cost (27) (†) - - LI 1350 - Infantry Weapons Ammunition Navy 0.000 UNCLASSIFIED Page 40 of 55 P-1 Line #19 Volume 1 - 320 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 0.000 - - 8.650 - - 23.763 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - AB51 - CRTG, 30MM X 173MM, APFSDS-T, MK258 MOD 1 Cost - - 0.000 - - 8.650 - - 23.763 - - 0.000 - - 0.000 - - 0.000 Hardware - AC55 - CRTG, 30MM HIGH EXPLOSIVE DUAL PURPOSE-SELF DESTRUCT (HEDP-SD) XM1198 Cost Recurring Cost 4.1.1) AC55 - Total Program Unit Cost (†) (28) Subtotal: Recurring Cost Subtotal: Hardware AC55 - CRTG, 30MM HIGH EXPLOSIVE DUAL PURPOSE-SELF DESTRUCT (HEDP-SD) XM1198 Cost 126.68 123,582 15.655 319.84 3,098 0.991 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 15.655 - - 0.991 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 15.655 - - 0.991 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10,883 28.335 17,749 39.123 - - 0.000 17,749 39.123 Hardware - AC61 - CTG, 30MM X 113MM HIGH EXPLOSIVE PROXIMITY (HEP) XM1211 Cost Recurring Cost 5.1.1) AC61 - Total (†) - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 28.335 - - 39.123 - - 0.000 - - 39.123 Subtotal: Hardware - AC61 CTG, 30MM X 113MM HIGH EXPLOSIVE PROXIMITY (HEP) XM1211 Cost - - 0.000 - - 0.000 - - 28.335 - - 39.123 - - 0.000 - - 39.123 Program Unit Cost (29) 2,603.56 2,204.25 2,204.25 Hardware - B139 - CRTG, 30MM TARGET PRACTICE (TP) XM950 Cost Recurring Cost 6.1.1) B139 - Total Program Unit Cost 138.41 13,092 1.812 - - 0.000 82.06 3,235 0.265 83.73 12,396 1.038 - - 0.000 83.73 12,396 1.038 - - 0.189 41.82 26,183 1.095 82.06 3,236 0.266 83.73 12,397 1.038 - - 0.000 83.73 12,397 1.038 Subtotal: Recurring Cost - - 2.001 - - 1.095 - - 0.531 - - 2.076 - - 0.000 - - 2.076 Subtotal: Hardware - B139 - CRTG, 30MM TARGET PRACTICE (TP) XM950 Cost - - 2.001 - - 1.095 - - 0.531 - - 2.076 - - 0.000 - - 2.076 (†) (NGIS) 6.1.2) B139 - Total Program Unit Cost (†) (GDOTS) LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 41 of 55 P-1 Line #19 Volume 1 - 321 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 17.656 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 22.297 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 60.165 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 54.421 Unit Cost ($) Qty (Each) - FY 2027 Total Total Cost ($ M) - 0.000 Unit Cost ($) - Total Cost Qty (Each) ($ M) - 54.421 Remarks: Standard ammunition provides the Warfighter with the necessary lethality needed to defeat the enemy. Specialty cannon caliber and 40 mm cartridges provide unique capabilities for the Warfighter (e.g., airburst, illumination). 30mm x 173mm supports the ACV and ARV using the MK44 Bushmaster while the 30mm x 113mm supports the MADIS and LMADIS programs. SMCA procured 30mm is part of a combined 20mm, 25mm, & 30mm contract. Quantity splits may be determined between two contractors in the year of execution. [Hardware/Recurring] (B139) SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. B139 is the sole 30mm x 113mm training round supporting the L-MADIS and is required to ensure their continued mission readiness. (†) indicates the presence of a P-5a Footnotes: (25) AA89 - AA89 is no longer available via the SMCA and is replaced by AB44. AB44 supports the Marine Corps fielding of the new Amphibious Combat Vehicle (ACV). AB44 is a SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (26) AA90 - This 30mm x 173mm round supports the Marine Corps fielding of the new Amphibious Combat Vehicle (ACV). This round is vital to the successful fielding of the ACV and the upcoming Advanced Reconnaissance Vehicle (ARV). SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. (27) AB51 - This 30mm x 173mm round supports Marine Corps fielding of the new Amphibious Combat Vehicle (ACV). This round is vital to the successful fielding of the ACV and the upcoming Advanced Reconnaissance Vehicle (ARV). SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and nonrecurring costs. This round is a War Reserve Munitions Requirement only and the Marine Corps inventory will not be established until deliveries are received beginning in 2026. (28) AC55 - SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. This round is vital to the successful fielding of the L-MADIS. Beginning in FY26, this round is fully replaced by AC61, and funding is reflected in the AC61 budget line. (29) AC61 - AC61 is the sole Counter-UAS 30mm x 113mm requirement supporting the L-MADIS platform. This requirement directly supports and impacts the L-MADIS and is required for them to be mission ready no later than FY28. This round is a War Reserve Munitions Requirement (WRMR) only and replaced AC55 as the sole WRMR requirement for the L-MADIS starting in FY26. Initial funding amounts in FY26 to FY28 will establish the Marine Corps inventory of this round and funding in the outyears brings the WRMR to 100%. SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 42 of 55 P-1 Line #19 Volume 1 - 322 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 1.1.1) AA89 - Total Program Unit Cost (†) 1.1.1) AA89 - Total Program Unit Cost (†) 1.1.1) AA89 - Total Program Unit Cost (†) 2.1.1) AA90 - Total Program Unit Cost 3.1.1) AB51 -Total Program Unit Cost (†) 3.1.1) AB51 -Total Program Unit Cost (†) 4.1.1) AC55 - Total Program Unit Cost 5.1.1) AC61 - Total Program Unit Cost (†) 5.1.1) AC61 - Total Program Unit Cost (†) (†) O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types FY Contractor and Location Method/Type or Funding Vehicle 2025 TO BE SELECTED / TBD C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 26,621 434.28 Y 2026 TO BE SELECTED / TBD C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 18,825 400.31 Y 2027 TO BE SELECTED / TBD C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 20,497 407.90 Y 2027 TO BE SELECTED / TBD C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 35,357 137.48 Y 2025 TO BE SELECTED / ROCK ISLAND ARSENAL, IL C / FFP PICATINNY ARSENAL, NJ Jun 2026 Jun 2027 11,982 721.92 Y 2026 TO BE SELECTED / ROCK ISLAND ARSENAL, IL C / FFP PICATINNY ARSENAL, NJ Jun 2026 Jun 2027 39,317 604.39 Y 2025 NORTHROP GRUMMAN INNOVATION SYSTEMS / PLYMOUTH, MN C / FFP Rock Island Arsenal, IL Jun 2026 Jun 2027 3,098 319.84 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 10,883 2,603.56 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 17,749 2,204.25 Y C / FFP ROCK ISLAND ARSENAL Jun 2026 Jun 2027 3,235 82.06 Y C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 12,396 83.73 Y C / FFP ROCK ISLAND ARSENAL May 2025 May 2026 26,183 41.82 Y C / FFP ROCK ISLAND ARSENAL Mar 2026 Mar 2027 3,236 82.06 Y C / FFP ROCK ISLAND ARSENAL Mar 2027 Mar 2028 12,397 83.73 Y 6.1.1) B139 - Total Program Unit Cost (NGIS) 2026 6.1.1) B139 - Total Program Unit Cost (NGIS) 2027 6.1.2) B139 - Total Program Unit Cost (GDOTS) 2025 6.1.2) B139 - Total Program Unit Cost (GDOTS) 2026 6.1.2) B139 - Total Program Unit Cost (GDOTS) 2027 NORTHROP GRUMMAN SYSTEMS CORP (30) / PLYMOUTH, MN NORTHROP GRUMMAN SYSTEMS CORP (30) / PLYMOUTH, MN GENERAL DYNAMICS OTS (31) / Marion, IL GENERAL DYNAMICS OTS (31) / Marion, IL GENERAL DYNAMICS OTS (31) / Marion, IL Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Footnotes: (30) (31) This item is part of a combined 20mm, 25mm, & 30mm contract. Quantity split will be determined between two contractors in the year of execution. This item is part of a combined 20mm, 25mm, & 30mm contract. Quantity split will be determined between two contractors in the year of execution. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 43 of 55 P-1 Line #19 Volume 1 - 323 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT PROC QTY 1.1.1) AA89 - Total Program Unit Cost Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (25) 1 2025 NAVY 26.621 .000 26.621 A - - - - 26.621 1 2026 NAVY 18.825 .000 18.825 A - - - - 18.825 1 2027 NAVY 20.497 .000 20.497 3.1.1) AB51 -Total Program Unit Cost 20.497 (27) 2 2025 NAVY 11.982 .000 11.982 A - - - - 11.982 2 2026 NAVY 39.317 .000 39.317 A - - - - 39.317 A - - - - 10.883 5.1.1) AC61 - Total Program Unit Cost (29) 3 2026 NAVY 10.883 .000 10.883 3 2027 NAVY 17.749 .000 17.749 17.749 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 44 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 324 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT PROC QTY 1.1.1) AA89 - Total Program Unit Cost Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y Calendar Year 2028 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U L A U G S E P (25) 1 2025 NAVY 26.621 .000 26.621 - - - - - - - - 2.223 2.218 2.218 2.218 2.218 2.218 2.218 2.218 2.218 2.218 2.218 2.218 1 2026 NAVY 18.825 .000 18.825 - - - - - - - - 1.577 1.568 1.568 1.568 1.568 1.568 1.568 1.568 1.568 1.568 1.568 1.568 1 2027 NAVY 20.497 .000 20.497 A - - - - - - - - - - - - 1.887 1.691 1.691 3.1.1) AB51 -Total Program Unit Cost J U N B A L A N C E .000 .000 1.691 1.691 1.691 1.691 8.464 (27) 2 2025 NAVY 11.982 .000 11.982 - - - - - - - - 1.004 .998 .998 .998 .998 .998 .998 .998 .998 .998 .998 .998 .000 2 2026 NAVY 39.317 .000 39.317 - - - - - - - - 3.281 3.276 3.276 3.276 3.276 3.276 3.276 3.276 3.276 3.276 3.276 3.276 .000 - - - - - - - - .917 .906 .906 .906 .906 .906 .906 .906 .906 .906 .906 .906 A - - - - - - - - - - - - 1.480 1.479 1.479 1.479 1.479 1.479 1.479 M A R A P R M A Y J U N J U L A U G S E P 5.1.1) AC61 - Total Program Unit Cost (29) 3 2026 NAVY 10.883 .000 10.883 3 2027 NAVY 17.749 .000 17.749 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 45 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 .000 7.395 Volume 1 - 325 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT PROC QTY 1.1.1) AA89 - Total Program Unit Cost Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (25) 1 2025 NAVY 26.621 26.621 .000 1 2026 NAVY 18.825 18.825 .000 1 2027 NAVY 20.497 12.033 8.464 3.1.1) AB51 -Total Program Unit Cost Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types .000 .000 1.691 1.691 1.691 1.691 1.700 .000 (27) 2 2025 NAVY 11.982 11.982 .000 .000 2 2026 NAVY 39.317 39.317 .000 .000 5.1.1) AC61 - Total Program Unit Cost (29) 3 2026 NAVY 10.883 10.883 .000 3 2027 NAVY 17.749 10.354 7.395 .000 1.479 1.479 1.479 1.479 1.479 O C T N O V D E C J A N F E B LI 1350 - Infantry Weapons Ammunition Navy .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 46 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 326 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 7 / MEDIUM CALIBER, 30MM, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TO BE SELECTED - TBD 12,000 456,000 840,000 6 6 12 18 6 6 12 18 2 TO BE SELECTED - ROCK ISLAND ARSENAL, IL 1,200 48,000 96,000 6 6 12 18 6 6 12 18 3 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 12,000 600,000 780,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 47 of 55 P-1 Line #19 Volume 1 - 327 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 74.330 19.329 29.919 0.000 29.919 - Gross/Weapon System Cost ($ in Millions) 160.613 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 160.613 Plus CY Advance Procurement ($ in Millions) - - - - - 74.330 19.329 29.919 0.000 29.919 - Total Obligation Authority ($ in Millions) 160.613 FY 2027 Total - - - - - 74.330 19.329 29.919 0.000 29.919 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - B542 - CTG, 40MM, HEDP, M430A1 W/M549A1 FZ Cost Recurring Cost 1.1.1) B542 - Total Program Unit Cost (†) 59.50 2,491,817 148.251 62.45 536,829 33.525 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 148.251 - - 33.525 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - B542 - CTG, 40MM, HEDP, M430A1 W/M549A1 FZ Cost - - 148.251 - - 33.525 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - B546 - CTG, 40MM HEDP M433, HIGH VELOCITY Cost Recurring Cost 2.1.1) B546 - Tranche - - 0.000 82.52 49,896 4.117 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 4.117 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - B546 - CTG, 40MM HEDP M433, HIGH VELOCITY Cost - - 0.000 - - 4.117 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.799 21.02 3.695 20.23 4.066 - - 0.000 20.23 28 (†) Hardware - BA35 - CRTG, 40MM PRAC, DAY/NIGHT, M1110 Cost Recurring Cost 3.1.1) BA35 - Total (†) Hardware Unit Cost (32) 18.68 656,690 12.267 LI 1350 - Infantry Weapons Ammunition Navy 18.68 363,972 175,784 UNCLASSIFIED Page 48 of 55 200,988 P-1 Line #19 200,988 4.066 Volume 1 - 328 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.2) BA35 Production Support Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.086 - - 0.045 - - 0.047 - - 0.048 - - 0.000 - - 0.048 18.11 497 0.009 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 12.362 - - 6.844 - - 3.742 - - 4.114 - - 0.000 - - 4.114 Subtotal: Hardware - BA35 CRTG, 40MM PRAC, DAY/ NIGHT, M1110 Cost - - 12.362 - - 6.844 - - 3.742 - - 4.114 - - 0.000 - - 4.114 29.844 63.36 15.587 68.18 25.805 - - 0.000 68.18 (33) 3.1.3) BA35 - Tranche (†) #25 Hardware - BA55 (BA67) - CTG, 40MM PRACTICE DAY/NIGHT THERMAL M918E2 Cost Recurring Cost 4.1.1) BA55 (BA67) - Total Program Unit (†) (34) Cost - - 0.000 53.37 559,190 246,006 378,483 378,483 25.805 Subtotal: Recurring Cost - - 0.000 - - 29.844 - - 15.587 - - 25.805 - - 0.000 - - 25.805 Subtotal: Hardware - BA55 (BA67) - CTG, 40MM PRACTICE DAY/NIGHT THERMAL M918E2 Cost - - 0.000 - - 29.844 - - 15.587 - - 25.805 - - 0.000 - - 25.805 Gross/Weapon System Cost - - 160.613 - - 74.330 - - 19.329 - - 29.919 - - 0.000 - - 29.919 Remarks: Standard ammunition provides the Warfighter with the necessary lethality needed to defeat the enemy. Specialty cannon caliber and 40 mm cartridges provide unique capabilities for the Warfighter such as HE, airburst, marking, and illumination. The 40mm ammunition is used with the 40mm M32A1 Grenade Launcher and 40mm MK19 Machine Gun. (†) indicates the presence of a P-5a Footnotes: (32) BA35 - Non-SMCA item. PdM Ammo managed contract. Pricing estimated based on stepladder pricing provided by contracting for IDIQ. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. BA35 is the only low velocity 40mm training used by the Marine Corps. Its luminescence has a service life of 6 years, after which it can no longer be utilized for nighttime training. Increase in funding from FY26 to FY27 and out is set to a level that maintains the TMR in conjunction with anticipated annual expenditures and inventory that is anticipated to meet/exceed its service life. (33) (34) BA35 - Funding required for First Article Acceptance Tests and Lot Acceptance Tests. BA55 - BA55 was a temporary DODIC that has been replaced by BA67 starting in FY25. SMCA item-pricing provided by the SMCA, incorporating other Service buys. Price per round includes all related production and engineering support costs, test costs, and non-recurring costs. Funding is set to a level that maintains the TMR in conjunction with anticipated annual expenditures. BA67 is the sole 40mm highvelocity training round for the Marine Corps. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 49 of 55 P-1 Line #19 Volume 1 - 329 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 1.1.1) B542 - Total Program Unit Cost 2024 AMTEC CORPORATION / JANESVILLE, WI C / FFP ROCK ISLAND ARSENAL Mar 2024 Aug 2025 1,469,792 65.34 Y 1.1.1) B542 - Total Program Unit Cost 2025 AMTEC CORPORATION / JANESVILLE, WI C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2029 536,829 62.45 Y 2025 AMTEC CORPORATION / JANESVILE, WI C / FFP ROCK ISLAND ARSENAL Mar 2025 Aug 2026 49,896 82.52 Y 3.1.1) BA35 - Total Hardware Unit Cost 2025 AMERICAN RHEINMETALL MUNITIONS / CAMDEN, AR SS / IDIQ MCSC, QUANTICO, VA Jun 2025 Jun 2026 363,972 18.68 Y 3.1.1) BA35 - Total Hardware Unit Cost 2026 AMERICAN RHEINMETALL MUNITIONS / CAMDEN, AR SS / IDIQ MCSC, QUANTICO, VA Jun 2026 Jun 2027 175,784 21.02 Y 3.1.1) BA35 - Total Hardware Unit Cost 2027 AMERICAN RHEINMETALL MUNITIONS / CAMDEN, AR SS / IDIQ MCSC, QUANTICO, VA Jun 2027 Jun 2028 200,988 20.23 Y 2024 AMERICAN RHEINMETALL MUNITIONS / CAMDEN, AR C / FFP Stafford, VA Jun 2025 Jun 2026 497 18.68 Y 2025 AMTEC CORPORATION / JANESVILE, WI C / IDIQ PICATINNY ARSENAL, NJ Jan 2026 Aug 2027 559,190 53.37 Y 2026 AMTEC CORPORATION / JANESVILE, WI C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Oct 2027 246,006 63.36 Y 2027 AMTEC CORPORATION / JANESVILE, WI C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Oct 2028 378,483 68.18 Y 2.1.1) B546 - Tranche 28 3.1.3) BA35 - Tranche #25 4.1.1) BA55 (BA67) - Total Program Unit Cost (†) 4.1.1) BA55 (BA67) - Total Program Unit Cost (†) 4.1.1) BA55 (BA67) - Total Program Unit Cost (†) O O C P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition (†) RFP Issue Date indicates the presence of a P-21 LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 50 of 55 P-1 Line #19 Volume 1 - 330 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 4.1.1) BA55 (BA67) - Total Program Unit Cost Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (34) 1 2025 NAVY 559.190 .000 559.190 559.190 1 2026 NAVY 246.006 .000 246.006 246.006 1 2027 NAVY 378.483 .000 378.483 378.483 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 51 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 331 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 4.1.1) BA55 (BA67) - Total Program Unit Cost Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (34) 1 2025 NAVY 559.190 .000 559.190 1 2026 NAVY 246.006 .000 246.006 1 2027 NAVY 378.483 .000 378.483 A - O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N - F E B - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - - - 246.006 A - - - - - - - 378.483 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 52 of 55 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L 46.601 46.599 465.990 A U G S E P Volume 1 - 332 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 4.1.1) BA55 (BA67) - Total Program Unit Cost Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (34) 1 2025 NAVY 559.190 1 2026 NAVY 246.006 93.200 465.990 46.599 46.599 46.599 46.599 46.599 46.599 46.599 46.599 46.599 46.599 .000 246.006 20.506 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 1 2027 NAVY 378.483 .000 378.483 O C T LI 1350 - Infantry Weapons Ammunition Navy N O V D E C J A N F E B M A R A P R M A Y J U N .000 J U L A U G UNCLASSIFIED Page 53 of 55 S E P .000 31.543 31.540 31.540 31.540 31.540 31.540 31.540 31.540 31.540 31.540 31.540 31.540 O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G .000 S E P Volume 1 - 333 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Item Number / Title [DODIC]: 8 / MEDIUM CALIBER AMMUNITION, 40MM, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 AMTEC CORPORATION JANESVILE, WI MSR For 2027 1-8-5 For 2027 MAX For 2027 2,400,000 36,000,000 660,000,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 19 Total After Oct 1 ALT Prior to Oct 1 25 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 19 25 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 54 of 55 P-1 Line #19 Volume 1 - 334 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1350 / Infantry Weapons Ammunition Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 9 / 1350 DIRECT COLLECTION FMS CASE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 19.415 0.000 0.000 0.000 0.000 - - - - - - 0.000 19.415 0.000 0.000 0.000 0.000 - - - - - - 0.000 19.415 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - 1350 DIRECT COLLECTION FMS CASE Cost Recurring Cost 1.1.1) 1350 DIRECT COLLECTION FMS CASE (35) - - 0.000 - - 19.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 19.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - 1350 DIRECT COLLECTION FMS CASE Cost - - 0.000 - - 19.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 0.000 - - 19.415 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Footnotes: (35) This budget includes FY25 reimbursable authority generated from the Foreign Military Sale of small- and medium-caliber ammunition. All reimbursement funds must be executed within the same BLI from which the assets were sold. LI 1350 - Infantry Weapons Ammunition Navy UNCLASSIFIED Page 55 of 55 P-1 Line #19 Volume 1 - 335 === page 364 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 336 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 169.303 169.303 169.303 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 25.173 12.936 12.510 0.000 12.510 21.512 20.765 22.589 23.039 - - - - - - - - - - - 25.173 12.936 12.510 0.000 12.510 21.512 20.765 22.589 23.039 - - - - - - - - - - - 25.173 12.936 12.510 0.000 12.510 21.512 20.765 22.589 23.039 - Total 307.827 307.827 307.827 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: In support of Force Design and Marine Corps readiness to address Littoral Operations in Contested Environments and the Indo-Pacific, the Family of Combat Support Munitions includes demolition items, handheld grenades, vehicle launched grenades, pyrotechnic devices, land mines, and non-lethal items. Demolition items provide high explosives for the purpose of destroying or altering man-made, natural objects, and/or obstacles. These explosive charges include blasting caps, impulse cartridges, block charges, shaped charges, flexible-linear charges, detonating cord, explosive sheet/cable, canine explosive scent kit items, chain cutters, military dynamite, and 12-Gauge cartridges used for Explosive Ordnance Disposal (EOD). Demolition munition charges are used for general demolition, cutting, breaching, cratering, and destruction of abandoned equipment/ammunition. Also included in this profile are all handheld offensive/vehicle launched grenades, pyrotechnics/simulator devices, and land mines used by Marine Corps ground forces. This budget also includes colored/ obscuration/irritant smoke grenades, and various pyrotechnics devices used in training to simulate battlefield effects. Additionally, this budget line item also includes non-lethal munition variants such as 12-Gauge cartridges, 40MM cartridges, and the diversionary/non-lethal hand grenades. These munitions are intended to incapacitate, warn or drive off targeted personnel and/or materiel while minimizing permanent injury to personnel and damage to property in the target area and/or environment. These munitions are procured either via Joint Program Executive Office, Armament and Ammunition (JPEO A&A)/Single Manager for Conventional Ammunition (SMCA) or Naval Surface Warfare Center Crane, IN (NSWC Crane) and NSWC Dahlgren, VA, using contracts that consolidate all Services buys into their procurement contract actions. These munitions have a procurement lead-time of 12-36 months before delivery. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 1 of 29 P-1 Line #20 Volume 1 - 337 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Demolition Munitions, All Types P-5a, P-21 - / 11.919 - / 8.671 - / 2.571 - / 2.938 - / 0.000 - / 2.938 P-5 2 / Linear Charges, All Types P-5a - / 95.168 - / 4.552 - / 4.979 - / 5.146 - / 0.000 - / 5.146 P-5 3 / Grenades, All Types / Non-Lethal P-5a, P-21 - / 62.216 - / 11.950 - / 5.386 - / 4.426 - / 0.000 - / 4.426 P-40 Total Gross/Weapon System Cost - / 169.303 - / 25.173 - / 12.936 - / 12.510 - / 0.000 - / 12.510 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Baseline Budget Request: $12.510M The FY27 baseline funds for the 1550 Combat Support Munitions budget support the Total Munitions Requirement (TMR), the Marine Corps' Approved Acquisition Objective. The TMR is the total number of rounds required for combat-ready forces. These funds replenish munitions expended in annual training and support deployment preparation, readiness, munitions lifecycle management and operational needs. FY 2027 Baseline funding is required to support procurement of various combat support munitions to include, but not limited to, Cartridge, 12 Gauge EOD Blank (DODIC AABK), Cartridge, 12-Gauge EOD Nitro Turkey (DODIC DWNT), Grenade, Hand Fragmentation M67 (DODIC G881), Grenade, Hand Smoke Green M18 (DODIC G940), Grenade, Hand Smoke Yellow M18 (DODIC G945), Grenade, Hand CS M7A3 (DODIC G963), Grenade, Hand Smoke White M83 (DODIC G982), Grenade, Hand Offensive Scalable MK21 MOD0 (DODIC GG41), Fuze, Hand Grenade Practice MK1 MOD0 (DODIC GG44), Mine, Antipersonnel, M18A1 (DODIC J007), Mine, Antipersonnel Practice M68 (DODIC J008), Simulator, Projectile Ground Burst M115A2 (DODIC L594), Cartridge, Signal and Illumination White Star (DODIC LA44), Military Dog Scent Kit (DODIC MDSK), Detonating Cord PETN (DODIC M456), Charge, Demo HE Linear M58 (DODIC M913), Charge, Demo Practice Linear M68A2 (DODIC M914), Charge, Demolition Flexible Linear Shape 225 Grains Per Foot (DODIC MM46), Charge, Demolition Flexible Linear Shape 400 Grains Per Foot (DODIC MM47), Mine, Antipersonnel Obstacle Breaching System MK7 MOD1 (APOBS) (DODIC MN79), and Cap, Blasting Dual In-Line Initiator, (DODIC MN88), Bangalore Torpedo Demo Kit M1A2 (DODIC M028). All items procured will support required annual sustainment and pre-deployment training, as well as Combat Operations. This funding also provides Engineering Support in Production (ESIP) costs for DODIC's listed above, and/or their suitable substitutes, for delivery of prior year procurements. ESIP costs support engineering functions on produced units which includes configuration management, First Article Testing (FAT), Lot Acceptance Testing (LAT), and support for items currently in production, and/or post-production delivery. Additionally, this funding addresses any changes to Form, Fit, and Function in design, assuring this ammunition is of the highest quality, and deals with any manufacturing concerns during these processes. Funding is also provided for First Destination Transportation as needed to support emergent shipments. This budget line includes Linear charges (all types), Grenades/Pyro/Land Mines (all types), Demolitions (all types), and Non-Lethal Munitions (all types). This budget also includes the use of suitable substitutes, like-items, legacy items and outyear items. The $0.426M budget decrease from FY 2026 to FY 2027 is due to an overall reduction in out-year training and operational requirements. Additionally, various delivery orders will be finalized, thus reducing the cost of production support required. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 2 of 29 P-1 Line #20 Volume 1 - 338 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 11.919 8.671 2.571 2.938 0.000 2.938 - - - - - - 11.919 8.671 2.571 2.938 0.000 2.938 - - - - - - 11.919 8.671 2.571 2.938 0.000 2.938 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - MDSK- Military Dog Scent Kit Items Cost Recurring Cost 1.1.1) MDSK MILITARY DOG SCENT KITS - - 0.486 - - 0.097 - - 0.099 - - 0.104 - - 0.000 - - 0.104 Subtotal: Recurring Cost - - 0.486 - - 0.097 - - 0.099 - - 0.104 - - 0.000 - - 0.104 Subtotal: Hardware - MDSKMilitary Dog Scent Kit Items Cost - - 0.486 - - 0.097 - - 0.099 - - 0.104 - - 0.000 - - 0.104 Hardware - DWNT- 12 Gauge EOD Nitro Turkey Cartridge Cost Recurring Cost 2.1.1) DWNT - COMPLETE 6.16 2,760 0.017 6.22 7,074 0.044 6.25 2,760 0.017 6.28 2,922 0.018 - - 0.000 6.28 2,922 0.018 Subtotal: Recurring Cost - - 0.017 - - 0.044 - - 0.017 - - 0.018 - - 0.000 - - 0.018 Subtotal: Hardware - DWNT12 Gauge EOD Nitro Turkey Cartridge Cost - - 0.017 - - 0.044 - - 0.017 - - 0.018 - - 0.000 - - 0.018 1.131 1.10 4.922 1.18 1.930 1.24 2.228 - - 0.000 1.24 0.087 - 0.204 - 0.181 - 0.235 - - 0.000 - ROUND (†) Hardware - M456- Cord, Detonating Reinforced Cost Recurring Cost 3.1.1) M456 COMPLETE ROUND (†) (1) 3.1.2) M456 PRODUCTION SUPPORT 1.07 - 1,056,934 - LI 1550 - Combat Support Munitions Navy 4,474,244 - 1,635,360 - UNCLASSIFIED Page 3 of 29 1,796,830 - P-1 Line #20 1,796,830 - 2.228 0.235 Volume 1 - 339 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 1.218 - - 5.126 - - 2.111 - - 2.463 - - 0.000 - - 2.463 Subtotal: Hardware - M456Cord, Detonating Reinforced Cost - - 1.218 - - 5.126 - - 2.111 - - 2.463 - - 0.000 - - 2.463 Hardware - M174 - Cartridge, Caliber .50 Impulse Electrically-Initiated Cost Recurring Cost 4.1.1) M174 COMPLETE ROUND - - 0.500 - - 0.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.500 - - 0.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - M174 - Cartridge, Caliber .50 Impulse Electrically-Initiated Cost - - 0.500 - - 0.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - AABK- 12 Gauge EOD Blank Cartridge Cost Recurring Cost 5.1.1) AABK - COMPLETE - - 0.000 4.49 6,680 0.030 4.58 2,620 0.012 4.67 2,570 0.012 - - 0.000 4.67 2,570 0.012 Subtotal: Recurring Cost - - 0.000 - - 0.030 - - 0.012 - - 0.012 - - 0.000 - - 0.012 Subtotal: Hardware - AABK12 Gauge EOD Blank Cartridge Cost - - 0.000 - - 0.030 - - 0.012 - - 0.012 - - 0.000 - - 0.012 ROUND (†) Hardware - MN88 - CAP, BLASTING, DUAL IN-LINE INITIATOR Cost Recurring Cost 6.1.1) MN88 - COMPLETE 60 0.291 60.37 15,415 0.931 73.25 1,305 0.096 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.252 - - 0.017 - - 0.119 - - 0.000 - - 0.119 Subtotal: Recurring Cost - - 0.291 - - 1.183 - - 0.113 - - 0.119 - - 0.000 - - 0.119 Subtotal: Hardware - MN88 CAP, BLASTING, DUAL INLINE INITIATOR Cost - - 0.291 - - 1.183 - - 0.113 - - 0.119 - - 0.000 - - 0.119 0.328 59.01 830 0.049 - - 0.000 - - 0.000 - - 0.000 ROUND (†) 6.1.2) MN88 PRODUCTION SUPPORT 4,850.00 Hardware - MM46- CHARGE, DEMOLITION, FLEXIBLE LINEAR SHAPED, 225 GRAINS PER FOOT Cost Recurring Cost 7.1.1) MM46 - COMPLETE ROUND (†) - - LI 1550 - Combat Support Munitions Navy 0.000 57.86 5,670 UNCLASSIFIED Page 4 of 29 P-1 Line #20 Volume 1 - 340 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 7.1.2) MM46 PRODUCTION Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 - - 0.002 - - 0.001 - - 0.050 - - 0.000 - - 0.050 Subtotal: Recurring Cost - - 0.000 - - 0.330 - - 0.050 - - 0.050 - - 0.000 - - 0.050 Subtotal: Hardware - MM46CHARGE, DEMOLITION, FLEXIBLE LINEAR SHAPED, 225 GRAINS PER FOOT Cost - - 0.000 - - 0.330 - - 0.050 - - 0.050 - - 0.000 - - 0.050 SUPPORT (2) Hardware - MM47- CHARGE, DEMOLITION, FLEXIBLE LINEAR SHAPED, 400 GRAINS PER FOOT Cost Recurring Cost 8.1.1) MM47 COMPLETE - - 0.000 79.99 9,750 0.780 81.59 600 0.049 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.003 - - 0.001 - - 0.050 - - 0.000 - - 0.050 Subtotal: Recurring Cost - - 0.000 - - 0.783 - - 0.050 - - 0.050 - - 0.000 - - 0.050 Subtotal: Hardware - MM47CHARGE, DEMOLITION, FLEXIBLE LINEAR SHAPED, 400 GRAINS PER FOOT Cost - - 0.000 - - 0.783 - - 0.050 - - 0.050 - - 0.000 - - 0.050 26 0.094 25 0.096 - - 0.000 25 0.096 ROUND (†) 8.1.2) MM47 PRODUCTION SUPPORT (3) Hardware - M028- DEMO KIT BANGALOR TORP M1A1/M1A2 Cost Recurring Cost 9.1.1) M028 COMPLETE - - 0.000 - - 0.000 - - 0.000 - - 0.049 - - 0.025 - - 0.026 - - 0.000 - - 0.026 Subtotal: Recurring Cost - - 0.000 - - 0.049 - - 0.119 - - 0.122 - - 0.000 - - 0.122 Subtotal: Hardware - M028DEMO KIT BANGALOR TORP M1A1/M1A2 Cost - - 0.000 - - 0.049 - - 0.119 - - 0.122 - - 0.000 - - 0.122 ROUND (†) (4) 9.1.2) M028 PRODUCTION SUPPORT 3,615.38 3,840.00 3,840.00 Hardware - M023 - CHARGE, DEMO BLOCK M112 (PD REPLENISHMENT) Cost Recurring Cost 10.1.1) M023 - COMPLETE ROUND (†) Subtotal: Recurring Cost 83.74 29,676 2.485 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.485 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 5 of 29 P-1 Line #20 Volume 1 - 341 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - M023 - CHARGE, DEMO BLOCK M112 (PD REPLENISHMENT) Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) 2.485 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - M131 - CAP NON-ELEC BLASTING (PD REPLENISHMENT) Cost Recurring Cost 11.1.1) M131 - COMPLETE 37.06 35,965 1.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - M131 CAP NON-ELEC BLASTING (PD REPLENISHMENT) Cost - - 1.333 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - MN08 - IGNITER, TIME BLASTING FUSE M81 (PD REPLENISHMENT) Cost Recurring Cost 12.1.1) MN08 - COMPLETE 15.03 5,255 0.079 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.079 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware MN08 - IGNITER, TIME BLASTING FUSE M81 (PD REPLENISHMENT) Cost - - 0.079 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.35 0.379 - - 0.000 - - 0.000 - - 0.000 - - 0.000 50.00 800 0.040 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 104.53 1,435 0.150 - - 0.000 - - 0.000 - - 0.000 - - 0.000 13.1.4) Prior Years Cumulative Total - - 5.470 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 5.510 - - 0.529 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - PD Ukraine Replenishment Cost Recurring Cost 13.1.1) M456- PD Replenishment Tranche 29 Complete 280,208 (†) Round 13.1.2) MN90- PD Replenishment Tranche 10 Complete (†) Round 13.1.3) DWHHPD Replenishment Tranche 29 Complete (†) Round LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 6 of 29 P-1 Line #20 Volume 1 - 342 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Hardware - PD Ukraine Replenishment Cost - - 5.510 - - 0.529 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 11.919 - - 8.671 - - 2.571 - - 2.938 - - 0.000 - - 2.938 (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) M456 - The increase in funding is due to an increase in projected out-year annual training and the replacement of expired inventory. Increased funding supports required acceptance testing for produced munitions lots. This funding provides for final acceptance testing, quality assurance, and delivery oversight for munitions procured in prior years. M028 - FY27 unit cost increases due to risk associated with a new contract. Cost includes added risk due to economic environment; low demand also affected price range. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 7 of 29 P-1 Line #20 Volume 1 - 343 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2.1.1) DWNT - COMPLETE ROUND 2024 TBD / TBD C / TBD NSWC Dahlgren, VA Sep 2026 Mar 2027 2,760 6.19 Y 2.1.1) DWNT - COMPLETE ROUND 2025 TBD / TBD C / TBD NSWC Dahlgren, VA Nov 2026 May 2027 7,074 6.22 Y 2.1.1) DWNT - COMPLETE ROUND 2026 TBD / TBD C / TBD NSWC Dahlgren, VA Nov 2026 May 2027 2,760 6.25 Y 2.1.1) DWNT - COMPLETE ROUND 2027 TBD / TBD C / TBD NSWC Dahlgren, VA Nov 2026 May 2027 2,922 6.28 Y 2025 Ensign-Bickford Aerospace & Defense / Simsbury, CT C / FFP ROCK ISLAND ARSENAL Aug 2025 Aug 2026 4,474,244 1.10 Y Jan 2025 2026 Ensign-Bickford Aerospace & Defense / Simsbury, CT C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 1,635,360 1.18 Y Jan 2026 2027 TBD / TBD C / TBD TBD Oct 2026 Oct 2026 1,796,830 1.24 Y 5.1.1) AABK - COMPLETE ROUND 2025 TBD / TBD C / TBD NSWC Dahlgren, VA Nov 2026 May 2027 6,680 4.49 Y 5.1.1) AABK - COMPLETE ROUND 2026 TBD / TBD C / TBD NSWC Dahlgren, VA Nov 2026 May 2027 2,620 4.58 Y 5.1.1) AABK - COMPLETE ROUND 2027 TBD / TBD C / TBD NSWC Dahlgren, VA Oct 2026 Apr 2027 2,570 4.67 Y Mar 2025 Mar 2027 15,415 60.37 Y Cost Elements 3.1.1) M456 - COMPLETE (†) ROUND 3.1.1) M456 - COMPLETE (†) ROUND 3.1.1) M456 - COMPLETE (†) ROUND 6.1.1) MN88 - COMPLETE ROUND O O C P-1 Line Item Number / Title: 1550 / Combat Support Munitions Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2025 ENSIGN BICKFORD / SIMSBURY, CT C / FFP PICATINNY ARSENAL, NJ 2026 ENSIGN BICKFORD / SIMSBURY, CT C / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 1,305 73.25 Y 7.1.1) MM46 - COMPLETE ROUND 2025 TBD / TBD C / TBD NSWC CRANE, IN Sep 2026 Sep 2027 5,670 57.86 Y 7.1.1) MM46 - COMPLETE ROUND 2026 TBD / TBD C / TBD NSWC CRANE, IN Sep 2026 Sep 2027 830 59.01 Y 8.1.1) MM47 COMPLETE ROUND 2025 TBD / TBD C / TBD NSWC CRANE, IN Sep 2026 Sep 2027 9,750 79.99 Y 8.1.1) MM47 COMPLETE ROUND 2026 TBD / TBD C / TBD NSWC CRANE, IN Sep 2026 Sep 2027 600 81.59 Y 2026 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Sep 2026 Sep 2027 26 3,615.38 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Oct 2026 Oct 2027 25 3,840.00 Y 10.1.1) M023 - COMPLETE ROUND 2024 AMERICAN ORDNANCE LLC (IAAP) / MIDDLETOWN, IA PO ROCK ISLAND, IL Dec 2025 Jan 2029 27,156 86.17 Y 11.1.1) M131 - COMPLETE ROUND 2024 STRESAU LABS / SPOONER, WI. C / FFP ROCK ISLAND ARSENAL Sep 2024 Oct 2027 35,265 37.14 Y 12.1.1) MN08 - COMPLETE ROUND 2024 JMC ROCK ISLAND / ROCK ISLAND, IL C / FFP ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2027 815 20.84 Y 6.1.1) MN88 - COMPLETE ROUND 9.1.1) M028 - COMPLETE ROUND 9.1.1) M028 - COMPLETE ROUND LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 8 of 29 P-1 Line #20 RFP Issue Date Oct 2024 Jan 2025 Oct 2024 Oct 2024 Jan 2026 Volume 1 - 344 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 (†) Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 13.1.1) M456- PD Replenishment Tranche 29 Complete Round 2025 ENSIGN BICKFORD / SIMSBURY, CT C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 280,208 1.35 Y 13.1.2) MN90- PD Replenishment Tranche 10 Complete Round 2023 Ensign-Bickford Aerospace & Defense / Simsbury, CT C / FFP ROCK ISLAND ARSENAL Sep 2024 Oct 2026 800 50.00 Y 13.1.3) DWHH- PD Replenishment Tranche 29 Complete Round 2025 STRESAU LABS / SPOONER, WI. C / FFP ROCK ISLAND ARSENAL, IL Oct 2024 Nov 2027 1,435 104.53 Y Cost Elements O O C P-1 Line Item Number / Title: 1550 / Combat Support Munitions Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 9 of 29 P-1 Line #20 Volume 1 - 345 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 3.1.1) M456 - COMPLETE ROUND Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 1056934 1 2025 NAVY 4.474 .000 4.474 1 2026 NAVY 1.635 .000 1.635 2 2027 NAVY 1.797 .000 1.797 A - 4.474 1.635 1.797 O C T LI 1550 - Combat Support Munitions Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 346 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 3.1.1) M456 - COMPLETE ROUND Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 1056934 1 2025 NAVY 4.474 .000 4.474 1 2026 NAVY 1.635 .000 1.635 2 2027 NAVY 1.797 .000 1.797 - O C T LI 1550 - Combat Support Munitions Navy - N O V - D E C - J A N - F E B - M A R - A P R - - - .373 .373 .373 .373 .373 .373 .373 .373 .373 .373 .373 .373 A - - - - - - - - - - - - .137 .137 .137 .137 .137 .951 A.149 .149 .149 .149 .149 .149 .149 .149 .149 .149 .149 .154 .000 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 29 S E P P-1 Line #20 .000 Volume 1 - 347 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY 3.1.1) M456 - COMPLETE ROUND Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R .137 .137 .137 .137 .137 .137 .131 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 1056934 1 2025 NAVY 4.474 4.474 .000 1 2026 NAVY 1.635 .684 .951 2 2027 NAVY 1.797 1.797 .000 LI 1550 - Combat Support Munitions Navy .000 .000 .000 M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 348 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 1 / Demolition Munitions, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Ensign-Bickford Aerospace & Defense - Simsbury, CT ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 96,000 96,000 4,565,376 8 8 12 20 6 6 9 15 TBD 0 0 0 0 0 0 0 0 2 TBD - TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 13 of 29 P-1 Line #20 Volume 1 - 349 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Linear Charges, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 95.168 4.552 4.979 5.146 0.000 5.146 - - - - - - 95.168 4.552 4.979 5.146 0.000 5.146 - - - - - - 95.168 4.552 4.979 5.146 0.000 5.146 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - M913 - CHG DEMO LINEAR M58 SERIES A4 Cost Recurring Cost 1.1.1) M913 COMPLETE 927 55.336 - - 0.870 Subtotal: Recurring Cost - - Subtotal: Hardware - M913 - CHG DEMO LINEAR M58 SERIES A4 Cost - - ROUND (†) (5) 1.1.2) M913 PRODUCTION SUPPORT 59,693.64 80,483.87 31 2.495 - - 0.114 56.206 - - 56.206 - 97,966.15 30 2.939 - - 0.177 2.609 - - - 2.609 - 87 1.359 109,359.77 29 3.171 - - 0.000 - - 0.060 - - 0.000 3.116 - - 3.231 - - - 3.116 - - 3.231 - 83 1.423 75 1.439 109,359.77 29 3.171 - - 0.060 0.000 - - 3.231 - 0.000 - - 3.231 - - 0.000 75 1.439 Hardware - MN79 - ANTI-PERS OBSTACLE BREACHING SYSTEM Cost Recurring Cost 2.1.1) MN79 - COMPLETE 2,470 38.268 - - 0.694 - - 0.072 - - 0.006 - - 0.030 - - 0.000 - - 0.030 Subtotal: Recurring Cost - - 38.962 - - 1.431 - - 1.429 - - 1.469 - - 0.000 - - 1.469 Subtotal: Hardware - MN79 - ANTI-PERS OBSTACLE BREACHING SYSTEM Cost - - 38.962 - - 1.431 - - 1.429 - - 1.469 - - 0.000 - - 1.469 ROUND (†) (6) 2.1.2) MN79 PRODUCTION SUPPORT 15,493.12 15,620.69 17,149.98 19,187.84 19,187.84 Hardware - M914- CHG DEMO LINEAR M68 Cost Recurring Cost LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 14 of 29 P-1 Line #20 Volume 1 - 350 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Linear Charges, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.1) M914 COMPLETE ROUND (†) 3.1.2) M914 PRODUCTION SUPPORT (7) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) - - 0.000 - - 0.000 Unit Cost ($) 34,133.33 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) 44,472.36 9 0.400 Unit Cost ($) 15 0.512 - - 0.000 - - 0.034 - FY 2027 OOC Total Cost Qty (Each) ($ M) 46,756.11 8 Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 0.374 - - 0.000 46,756.11 8 0.374 - 0.072 - - 0.000 - - 0.072 Subtotal: Recurring Cost - - 0.000 - - 0.512 - - 0.434 - - 0.446 - - 0.000 - - 0.446 Subtotal: Hardware - M914CHG DEMO LINEAR M68 Cost - - 0.000 - - 0.512 - - 0.434 - - 0.446 - - 0.000 - - 0.446 Gross/Weapon System Cost - - 95.168 - - 4.552 - - 4.979 - - 5.146 - - 0.000 - - 5.146 (†) indicates the presence of a P-5a Footnotes: (5) M913 - FY 2027 unit cost increases due to risk associated with a new contract. A new fuze will be added to the M913 and contributes to the overall cost increase of the system. The cost elements are consolidated to complete round/total hardware and production support costs to be in line with other budget line items. Additionally, removing the component breakout provides clear visibility of the final deliverable quantities and total unit cost. (6) MN79 - FY27 unit cost increases due to risk associated with a new contract. The cost elements are consolidated to complete round/total hardware and production support costs to be in line with other budget line items. Additionally, removing the component breakout provides clear visibility of the final deliverable quantities and total unit cost (7) Increased funding supports required acceptance testing for produced munitions lots. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 15 of 29 P-1 Line #20 Volume 1 - 351 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 1.1.1) M913 - COMPLETE ROUND 1.1.1) M913 - COMPLETE ROUND 1.1.1) M913 - COMPLETE ROUND 1.1.1) M913 - COMPLETE ROUND 2.1.1) MN79 - COMPLETE ROUND 2.1.1) MN79 - COMPLETE ROUND 2.1.1) MN79 - COMPLETE ROUND 2.1.1) MN79 - COMPLETE ROUND 3.1.1) M914 - COMPLETE ROUND 3.1.1) M914 - COMPLETE ROUND 3.1.1) M914 - COMPLETE ROUND O O C P-1 Line Item Number / Title: 1550 / Combat Support Munitions Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Linear Charges, All Types Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL Aug 2024 Aug 2026 32 33,250.00 Y 2025 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL Oct 2024 Oct 2026 31 80,483.87 Y 2026 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2028 30 97,966.15 Y 2027 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL Jun 2027 Jun 2029 29 109,359.77 Y 2024 NAMMO PERRY INC / PERRY, FL C / FFP ROCK ISLAND ARSENAL Aug 2024 Aug 2026 66 12,575.76 Y 2025 Ensign-Bickford Aerospace & Defense / Simsbury, CT C / FFP ROCK ISLAND ARSENAL Oct 2024 Aug 2026 87 15,620.69 Y 2026 TBD / TBD C / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Jul 2026 83 17,149.98 Y 2027 TBD / TBD C / TBD TBD Oct 2026 Oct 2026 75 19,187.84 Y 2025 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL,IL Mar 2025 Sep 2026 15 34,133.33 Y 2026 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2028 9 44,472.36 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL Jun 2027 Dec 2027 8 46,756.11 Y LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 16 of 29 P-1 Line #20 (Each) RFP Issue Date Mar 2024 Volume 1 - 352 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 62.216 11.950 5.386 4.426 0.000 4.426 - - - - - - 62.216 11.950 5.386 4.426 0.000 4.426 - - - - - - 62.216 11.950 5.386 4.426 0.000 4.426 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - G940, GRENADE, HAND SMOKE GREEN M18 Cost Recurring Cost 1.1.1) G940 COMPLETE ROUND 77.43 61,088 4.730 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.404 - - 0.300 - - 0.245 - - 0.000 - - 0.000 - - 0.000 1.1.3) G940 GREN, HAND SMOKE GREEN M18 - QUALITY ASSURANCE - - 0.027 - - 0.051 - - 0.055 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 5.161 - - 0.351 - - 0.300 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - G940, GRENADE, HAND SMOKE GREEN M18 Cost - - 5.161 - - 0.351 - - 0.300 - - 0.000 - - 0.000 - - 0.000 1.1.2) G940 - GREN, HAND SMOKE GREEN M18 PRODUCTION ENGINEERING (8) Hardware - G945, GRENADE, HAND SMOKE YELLOW M18 Cost Recurring Cost 2.1.1) G945 COMPLETE ROUND (†) 2.1.2) G945 - GREN, HAND SMOKE YELLOW M18 - 82.91 60,003 4.975 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.439 - - 0.250 - - 0.200 - - 0.000 - - 0.000 - - 0.000 LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 17 of 29 P-1 Line #20 Volume 1 - 353 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements PRODUCTION ENGINEERING Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) (9) 2.1.3) G945 GREN, HAND SMOKE YELLOW M18 - QUALITY ASSURANCE - - 0.028 - - 0.051 - - 0.050 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 5.442 - - 0.301 - - 0.250 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - G945, GRENADE, HAND SMOKE YELLOW M18 Cost - - 5.442 - - 0.301 - - 0.250 - - 0.000 - - 0.000 - - 0.000 Hardware - G963, GRENADE, HAND RIOT CS M7A3 Cost Recurring Cost 3.1.1) G963 COMPLETE 300.76 20,558 6.183 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 4.672 - - 0.250 - - 0.350 - - 0.000 - - 0.000 - - 0.000 3.1.3) G963 - GREN, HAND RIOT CS M7A3 - QUALITY ASSURANCE - - 0.012 - - 0.051 - - 0.050 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 10.867 - - 0.301 - - 0.400 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - G963, GRENADE, HAND RIOT CS M7A3 Cost - - 10.867 - - 0.301 - - 0.400 - - 0.000 - - 0.000 - - 0.000 9.053 67.90 12,828 0.871 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) 3.1.2) G963 - GREN, HAND RIOT CS M7A3 - PRODUCTION ENGINEERING (10) Hardware - G982, GRENADE, HAND SMOKE WHITE TA M83 Cost Recurring Cost 4.1.1) G982 COMPLETE ROUND (†) 59.11 153,165 4.1.2) G982 - GREN, HAND SMOKE WHITE TA M83 - PRODUCTION ENGINEERING - - 1.337 - - 0.157 - - 0.307 - - 0.301 - - 0.000 - - 0.301 4.1.3) G982 GREN, HAND SMOKE WHITE TA M83 - QUALITY ASSURANCE - - 0.060 - - 0.007 - - 0.012 - - 0.000 - - 0.000 - - 0.000 LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 18 of 29 P-1 Line #20 Volume 1 - 354 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 10.450 - - 1.035 - - 0.319 - - 0.301 - - 0.000 - - 0.301 Subtotal: Hardware - G982, GRENADE, HAND SMOKE WHITE TA M83 Cost - - 10.450 - - 1.035 - - 0.319 - - 0.301 - - 0.000 - - 0.301 Hardware - GG41, GRENADE, HAND OFFENSIVE SCALABLE, MK21 MOD0 (SOHG) Cost Non Recurring Cost 5.1.1) GG41 - COMPLETE 159.19 57,430 9.142 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.2) GG41 GREN, HAND OFF. SCALABLE, MK21 MOD0 PRODUCTION ENGINEERING - - 0.139 - - 0.007 - - 0.002 - - 0.000 - - 0.000 - - 0.000 5.1.3) GG41 GREN, HAND OFF. SCALABLE, MK21 MOD0 CONTRACTING FEE - - 0.074 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 9.355 - - 0.007 - - 0.002 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware GG41, GRENADE, HAND OFFENSIVE SCALABLE, MK21 MOD0 (SOHG) Cost - - 9.355 - - 0.007 - - 0.002 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - GG44, FUZE ,PRACTICE GRENADE MK1 MOD0 Cost Non Recurring Cost 6.1.1) GG44 - COMPLETE - - 0.000 - - 0.000 29.71 25,681 0.763 31.13 24,702 0.769 - - 0.000 31.13 24,702 0.769 6.1.2) GG44 PRODUCTION SUPPORT - - 0.000 - - 0.000 - - 0.041 - - 0.059 - - 0.000 - - 0.059 Subtotal: Non Recurring Cost - - 0.000 - - 0.000 - - 0.804 - - 0.828 - - 0.000 - - 0.828 Subtotal: Hardware GG44, FUZE ,PRACTICE GRENADE MK1 MOD0 Cost - - 0.000 - - 0.000 - - 0.804 - - 0.828 - - 0.000 - - 0.828 ROUND (†) Hardware - J008, MINE, APERS, PRACTICE, M68 Cost Recurring Cost LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 19 of 29 P-1 Line #20 Volume 1 - 355 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 7.1.1) J008 COMPLETE Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 - - 0.000 - - 0.000 89.98 433 0.039 - - 0.000 89.98 433 0.039 - - 0.000 - - 0.000 - - 0.000 - - 0.002 - - 0.000 - - 0.002 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.000 - - 0.041 - - 0.000 - - 0.041 Subtotal: Hardware - J008, MINE, APERS, PRACTICE, M68 Cost - - 0.000 - - 0.000 - - 0.000 - - 0.041 - - 0.000 - - 0.041 3.609 36.14 73,538 2.658 39.88 66,165 2.639 - - 0.000 39.88 66,165 2.639 ROUND (†) (11) 7.1.2) J008 PRODUCTION SUPPORT Hardware - L594, GROUND BURST PROJECTILE SIMULATOR M115A2 Cost Recurring Cost 8.1.1) L594 COMPLETE - - 0.000 33.92 - - 0.000 - - 0.206 - - 0.219 - - 0.251 - - 0.000 - - 0.251 Subtotal: Recurring Cost - - 0.000 - - 3.815 - - 2.877 - - 2.890 - - 0.000 - - 2.890 Subtotal: Hardware L594, GROUND BURST PROJECTILE SIMULATOR M115A2 Cost - - 0.000 - - 3.815 - - 2.877 - - 2.890 - - 0.000 - - 2.890 ROUND (†) 8.1.2) L594 PRODUCTION SUPPORT 106,407 Hardware - LA44, CARTRIDGE, SIGNAL AND ILLUM, WHITE STAR Cost Non Recurring Cost 9.1.1) LA44 COMPLETE - - 0.000 20.00 21,250 0.425 20.60 17,427 0.359 21.22 13,619 0.289 - - 0.000 21.22 13,619 0.289 9.1.2) LA44 PRODUCTION SUPPORT - - 0.000 - - 0.076 - - 0.075 - - 0.077 - - 0.000 - - 0.077 Subtotal: Non Recurring Cost - - 0.000 - - 0.501 - - 0.434 - - 0.366 - - 0.000 - - 0.366 Subtotal: Hardware - LA44, CARTRIDGE, SIGNAL AND ILLUM, WHITE STAR Cost - - 0.000 - - 0.501 - - 0.434 - - 0.366 - - 0.000 - - 0.366 1.237 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - G881, GRENADE, HAND FRAG M67 W/ CONF CLIP ( PD REPLENISHMENT ) Cost Recurring Cost 10.1.1) G881 - COMPLETE ROUND (†) 55.68 187,078 LI 1550 - Combat Support Munitions Navy 10.416 67.05 18,450 UNCLASSIFIED Page 20 of 29 P-1 Line #20 Volume 1 - 356 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 10.416 - - 1.237 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - G881, GRENADE, HAND FRAG M67 W/ CONF CLIP ( PD REPLENISHMENT ) Cost - - 10.416 - - 1.237 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - G940, GRENADE, HAND SMOKE GREEN M18 ( PD REPLENISHMENT ) Cost Recurring Cost 11.1.1) G940 COMPLETE ROUND 81.10 46,362 3.760 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 3.760 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware G940, GRENADE, HAND SMOKE GREEN M18 ( PD REPLENISHMENT ) Cost - - 3.760 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (PD) Hardware - G945, GRENADE, HAND SMOKE YELLOW M18 ( PD REPLENISHMENT ) Cost Recurring Cost 12.1.1) G945 - COMPLETE 64.77 33,302 2.157 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.157 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware G945, GRENADE, HAND SMOKE YELLOW M18 ( PD REPLENISHMENT ) Cost - - 2.157 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - G950, GRENADE, HAND, SMOKE RED M18 (PD REPLENISHMENT) Cost Recurring Cost 13.1.1) G950 - COMPLETE 115.87 3,202 0.371 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.371 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware G950, GRENADE, HAND, SMOKE RED M18 (PD REPLENISHMENT) Cost - - 0.371 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 922 0.149 - - 0.000 - - 0.000 - - 0.000 - - 0.000 ROUND (†) Hardware - G955, GRENADE, HAND, SMOKE VIOLET M18 (PD REPLENISHMENT) Cost Recurring Cost 14.1.1) G955 - COMPLETE ROUND (†) - - LI 1550 - Combat Support Munitions Navy 0.000 161.61 UNCLASSIFIED Page 21 of 29 P-1 Line #20 Volume 1 - 357 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 0.000 - - 0.149 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware G955, GRENADE, HAND, SMOKE VIOLET M18 (PD REPLENISHMENT) Cost - - 0.000 - - 0.149 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - J007, MINE, ANTI-PERS M18A1 CLAYMORE ( PD REPLENISHMENT ) Cost Recurring Cost 15.1.1) J007 - COMPLETE ROUND (UKRAINE TRANCHE) 15.1.2) J007 - COMPLETE ROUND (TAIWAN TRANCHE) 460.85 1,903 0.877 477.56 712 0.340 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 477.56 2,496 1.192 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.877 - - 1.532 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.877 - - 1.532 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,303 2.509 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) (†) Subtotal: Recurring Cost Subtotal: Hardware J007, MINE, ANTI-PERS M18A1 CLAYMORE ( PD REPLENISHMENT ) Cost Hardware - CA72, 81MM FLASH BANG MK345 MOD 0 NON-LETHAL Cost Recurring Cost 16.1.1) CA72 - COMPLETE ROUND (†) (12) 1,873.28 363 0.680 1,925.68 16.1.2) CA72 Production Support - - 0.158 - - 0.212 - - 0.000 - - 0.000 - - 0.000 - - 0.000 16.1.3) Prior Years Cumulative Total - - 2.522 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 3.360 - - 2.721 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - CA72, 81MM FLASH BANG MK345 MOD 0 NON-LETHAL Cost - - 3.360 - - 2.721 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 62.216 - - 11.950 - - 5.386 - - 4.426 - - 0.000 - - 4.426 (†) indicates the presence of a P-5a Footnotes: (8) The decrease in funding for DODIC G940, from FY26 to FY27, reflects a planned decrease in item procurement with continued funding for production support until deliveries are complete. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 22 of 29 P-1 Line #20 Volume 1 - 358 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 P-1 Line Item Number / Title: 1550 / Combat Support Munitions ID Code (A=Service Ready, B=Not Service Ready) : (9) Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal MDAP/MAIS Code: The decrease in funding for DODIC G945, from FY26 to FY27, reflects a planned decrease in item procurement with continued funding for production support until deliveries are complete. (10) (11) The decrease in funding for DODIC G963, from FY26 to FY27, reflects a planned decrease in item procurement with continued funding for production support until deliveries are complete. J008 - The increase of $0.039M in funding is to procure the ammunition to maintain annual training requirement of 383 rounds, and to replace expended and expired inventory. This DODIC was not previously funded since inventory levels were still above TMR guidance. (12) CA72- 81MM Flashbang Munition Non-lethal has been moved into BLI 1085 from BLI 1550 in FY 2026. LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 23 of 29 P-1 Line #20 Volume 1 - 359 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements 2.1.1) G945 - COMPLETE ROUND 3.1.1) G963 - COMPLETE ROUND 3.1.1) G963 - COMPLETE ROUND 3.1.1) G963 - COMPLETE ROUND 4.1.1) G982 - COMPLETE ROUND 5.1.1) GG41 - COMPLETE (†) ROUND 6.1.1) GG44 - COMPLETE ROUND 6.1.1) GG44 - COMPLETE ROUND 7.1.1) J008 - COMPLETE ROUND 8.1.1) L594 - COMPLETE ROUND 8.1.1) L594 - COMPLETE ROUND 8.1.1) L594 - COMPLETE ROUND 9.1.1) LA44 - COMPLETE ROUND 9.1.1) LA44 - COMPLETE ROUND 9.1.1) LA44 - COMPLETE ROUND O O C P-1 Line Item Number / Title: 1550 / Combat Support Munitions Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 2023 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Jan 2024 Nov 2025 60,003 65.19 Y Oct 2023 2022 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2022 Aug 2026 1,568 220.99 Y Jan 2022 2023 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2023 Aug 2026 17,747 214.01 Y Jan 2023 2024 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2024 Aug 2026 1,243 229.89 Y Jan 2024 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Apr 2025 Jul 2028 12,828 67.90 Y Jan 2025 2024 NAMMO DEFENCE INC / FINLAND C / FFP NSWC CRANE, IN Oct 2024 Oct 2025 771 173.00 Y Jul 2024 2026 RHEINMETALL / GERMANY C / FFP NSWC DIVISION, CRANE, IN Sep 2026 Sep 2027 25,681 29.71 Y Jun 2026 2027 RHEINMETALL / GERMANY C / FFP NSWC DIVISION, CRANE, IN Oct 2026 Oct 2027 24,702 31.13 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL Oct 2026 Oct 2026 433 89.98 Y 2025 PYROTECHNIQUE BY GRUCCI, INC / RADFORD, VA C / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 106,407 33.92 Y Mar 2025 2026 PYROTECHNIQUE BY GRUCCI, INC / RADFORD, VA C / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 73,538 36.14 Y Mar 2026 2027 TBD / TBD C / TBD TBD Oct 2026 Oct 2026 66,165 39.88 Y Apr 2026 Apr 2027 21,250 20.00 Y Jan 2025 Jan 2026 (Each) 2025 TBD / TBD C / FFP PICATINNY ARSENAL, NJ 2026 TBD / TBD TBD PICATINNY ARSENAL, NJ Apr 2026 Apr 2027 17,427 20.60 Y 2027 TBD / TBD TBD TBD Mar 2027 Mar 2027 13,619 21.22 Y 10.1.1) G881 - COMPLETE ROUND 2024 DAY&ZIMMERMAN LONE STAR LLC, TEXARKANA, TX / Camden AR PO ROCK ISLAND ARSENAL, IL Oct 2023 Jun 2026 35,536 71.87 Y 10.1.1) G881 - COMPLETE ROUND 2025 DAY&ZIMMERMAN LONE STAR LLC, TEXARKANA, TX / Camden AR PO ROCK ISLAND ARSENAL Oct 2024 Nov 2026 18,450 67.05 Y 11.1.1) G940 - COMPLETE ROUND (PD) 2024 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Oct 2023 Jul 2026 1,665 101.45 Y 12.1.1) G945 - COMPLETE ROUND 2024 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Oct 2023 Jun 2026 1,731 104.51 Y 13.1.1) G950 - COMPLETE ROUND 2024 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL Aug 2025 Aug 2028 3,202 115.83 Y 14.1.1) G955 - COMPLETE ROUND 2025 TBD / TBD C / TBD ROCK ISLAND ARSENAL Oct 2026 Oct 2026 922 161.61 Y LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 24 of 29 P-1 Line #20 Volume 1 - 360 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: 1550 / Combat Support Munitions Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 15.1.1) J007 - COMPLETE ROUND (UKRAINE TRANCHE) 2023 ADVANCE ENERGETIC STSYEM / McEWEN, TN C / FFP ROCK ISLAND ARSENAL,IL Dec 2023 Jun 2026 167 286.57 Y 15.1.1) J007 - COMPLETE ROUND (UKRAINE TRANCHE) 2024 ADVANCE ENERGETIC STSYEM / McEWEN, TN C / FFP ROCK ISLAND ARSENAL, IL Oct 2023 Jun 2026 1,736 477.50 Y 15.1.1) J007 - COMPLETE ROUND (UKRAINE TRANCHE) 2025 ADVANCE ENERGETIC STSYEM / McEWEN, TN C / TBD ROCK ISLAND ARSENAL, IL Jul 2025 Oct 2026 712 477.56 Y 15.1.2) J007 - COMPLETE ROUND (TAIWAN TRANCHE) 2025 ADVANCE ENERGETIC STSYEM / McEWEN, TN C / FFP ROCK ISLAND ARSENAL, IL Jul 2025 Jul 2026 2,496 477.56 Y 16.1.1) CA72 - COMPLETE ROUND 2024 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Jan 2024 Jul 2026 363 1,873.03 Y Oct 2023 16.1.1) CA72 - COMPLETE ROUND 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Jan 2025 Jul 2027 1,303 1,925.68 Y Oct 2024 (Each) Sep 2023 indicates the presence of a P-21 LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 25 of 29 P-1 Line #20 Volume 1 - 361 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 5.1.1) GG41 - COMPLETE ROUND Prior Years Deliveries: 56659 1 2024 NAVY 771 0 771 LI 1550 - Combat Support Munitions Navy 771 UNCLASSIFIED Page 26 of 29 P-1 Line #20 Volume 1 - 362 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT B A L A N C E Fiscal Year 2025 Calendar Year 2024 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 5.1.1) GG41 - COMPLETE ROUND Prior Years Deliveries: 56659 1 2024 NAVY 771 0 771 LI 1550 - Combat Support Munitions Navy A - UNCLASSIFIED Page 27 of 29 O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G - 771 S E P Volume 1 - 363 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V Calendar Year 2027 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 5.1.1) GG41 - COMPLETE ROUND Prior Years Deliveries: 56659 1 2024 NAVY 771 0 771 700 O C T LI 1550 - Combat Support Munitions Navy 71 N O V 0 UNCLASSIFIED Page 28 of 29 P-1 Line #20 Volume 1 - 364 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1550 / Combat Support Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC]: 3 / Grenades, All Types / Non-Lethal Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NAMMO DEFENCE INC FINLAND MSR For 2027 1-8-5 For 2027 MAX For 2027 5,000 15,000 58,000 ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 9 18 Total After Oct 1 ALT Prior to Oct 1 27 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1550 - Combat Support Munitions Navy UNCLASSIFIED Page 29 of 29 P-1 Line #20 Volume 1 - 365 === page 394 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 366 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1630 / Ammo Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 190.889 190.889 190.889 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 17.518 18.467 19.009 0.000 19.009 19.361 19.746 20.143 20.546 - - - - - - - - - - - 17.518 18.467 19.009 0.000 19.009 19.361 19.746 20.143 20.546 - - - - - - - - - - - 17.518 18.467 19.009 0.000 19.009 19.361 19.746 20.143 20.546 - Total 325.679 325.679 325.679 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Ammunition Modernization budget is a critical investment in technical expertise that directly ensures the lethality, safety, and reliability of the ammunition our Marines carry into battle. This funding is essential for maintaining a decisive edge over our adversaries and safeguarding our warfighters. It funds the expert engineering and scientific analysis from Naval Surface Warfare Centers (NSWCs) required to support ammunition procurements, quality assurance in production and field the next generation of advanced ammunition. The program's rigorous testing, evaluation, and malfunction investigations identify and mitigate ammunition risks before they can endanger Marines. By analyzing and managing the service life of the entire ammunition stockpile, this ensures every round is safe and effective. The INTERNAL SUPPORT budget element is the command-and-control framework that enables the effective leadership and expert oversight of the entire Marine Corps ammunition enterprise. This funding is indispensable for guaranteeing the safety, security, and readiness of our multi-billion-dollar ammunition stockpile. This is not administrative support; it is the core operational capability that allows the Ammunition Life Cycle Management program office to do the following: Ensure fiscal integrity: Execute professional financial management to ensure the scrupulous, transparent, and accountable use of every dollar appropriated for the USMC's ammunition, a critical national security asset. Defend Against Cyber Threats: Provide the dedicated cybersecurity expertise required to protect the sensitive technical data, logistics information, and inventory of our entire stockpile from adversary espionage and disruption. Execute On-Site Technical Oversight: Fund the essential travel for program managers and technical experts to conduct hands-on quality assurance, witness testing, and perform critical safety inspections at depots, proving grounds, and manufacturing plants. The EXTERNAL SUPPORT budget is the critical funding line that allows the Marine Corps to utilize technical expertise of the Department of War's premier engineering and scientific centers of excellence for ammunition: Naval Surface Warfare Centers (NSWC) Crane, Dahlgren, and Indian Head. This is the sole funding line that allows the Marine Corps to leverage the specialized talent and infrastructure of these institutions to ensure the ammunition stockpile is safe, reliable and lethal. This funding line supports the following: Provides the core engineering and technical support required to procure and manage Marine Corps-unique or specialized ammunition items that fall outside what is available from the Single Manager for Conventional Ammunition. Funds the expert configuration management of Technical Data Packages for Marine Corps-specific munitions. This ensures the integrity of the design and prevents unauthorized or unsafe modifications throughout the ammunition's lifecycle. Delivers the rigorous systems engineering analysis and testing required to guarantee the safety and reliability of our ammunition, directly preventing malfunctions that could endanger Marines in training or combat. Leveraging the existing infrastructure and expertise at the NSWCs prevents the Marine Corps from having to create a costly and duplicative organic capability, ensuring fiscal responsibility while maintaining technical superiority. The Expeditionary Systems Engineering Division (ESED) budget funds the Marine Corps' designated In-Service Engineering Agent (ISEA) for conventional ground ammunition. This budget provides critical engineering expertise to guarantee the quality and safety of ammunition for the warfighter. The ISEA's primary function is to serve as the Marine Corps' technical authority during the most important events LI 1630 - Ammo Modernization Navy UNCLASSIFIED Page 1 of 4 P-1 Line #21 Volume 1 - 367 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1630 / Ammo Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A of the ammunition production cycle. This budget enables engineers embedded in Integrated Production Teams (IPTs), to travel to contractor facilities for targeted oversight at critical events. Validation at the Source: ESED personnel witness and validate First Article and Lot Acceptance Testing. This is the government's key opportunity to physically verify that a contractor's process is sound and that the ammunition produced meets all contractual safety and performance specifications before it is accepted. High-Level Defect Adjudication: When systemic quality or manufacturing issues are identified, the ISEA provides a surge of expert engineering analysis. They lead the effort to diagnose the root cause and approve the corrective action, ensuring problems are fixed at the source and do not propagate to the fleet. Technical Data Package (TDP) Conformance: During these critical events, ESED acts as the ultimate authority on whether the produced ammunition conforms to the government-owned technical specifications, a vital step for enforcing contract compliance. Lifecycle Engineering and Risk Management: ESED's responsibility extends across the ammunition's entire service life, long after production is complete. They manage the technical health of the stockpile to ensure enduring safety and reliability. This funding supports the engineering analysis required to investigate fleet-reported malfunctions or concerns. ESED develops the technical solutions, such as use-restrictions or repair procedures for problematic lots, and manages the overall serviceability of ammunition, ultimately reducing the risk of catastrophic failure and protecting the warfighter. LI 1630 - Ammo Modernization Navy UNCLASSIFIED Page 2 of 4 P-1 Line #21 Volume 1 - 368 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1630 / Ammo Modernization Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Ammo Modernization - / 190.889 - / 17.518 - / 18.467 - / 19.009 P-40 Total Gross/Weapon System Cost - / 190.889 - / 17.518 - / 18.467 - / 19.009 - / - - / 19.009 / 0.000 - / 19.009 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 Baseline Appropriation Request: $19.009M FY2027 Baseline funding will support the modernization of ground-delivered Class V(W) ammunition and associated components, as well as quality evaluation and assessment. Funding will support the efforts associated with service life accelerated age testing, malfunctions, and quality assurance. Ammunition Modernization addresses the total life cycle management of ammunitions through cyclic testing, surveillance, and destructive testing to assure safety, reliability, performance and combat readiness of ammunition assets. The funding increase of $0.542M from FY2026 to FY2027 supports inflation of annual program requirements associated with the procurement and improvement of ammunition through technical, engineering, safety and production assessment modernization efforts. Funding is also provided for First Destination Transportation as needed to support emergent shipments. The consolidation of Ammunition Modernization cost elements enables the budgeting and execution of program requirements to be reflected in a current, more accurate division of support associated with the procurement and improvement of ammunition for the Marine Corps. LI 1630 - Ammo Modernization Navy UNCLASSIFIED Page 3 of 4 P-1 Line #21 Volume 1 - 369 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1630 / Ammo Modernization Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Ammo Modernization FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Ammo Modernization 1.1) AM01 INTERNAL SUPPORT A 1.2) AM02 EXTERNAL SUPPORT A 1.3) AM03 ESED A SUPPORT (2) 1.4) Prior Year Cumulative Total A - - 1.216 - - 1.853 - - 1.839 - - 1.612 - - - - - 1.612 - - 2.781 - - 4.245 - - 3.999 - - 3.056 - - - - - 3.056 - - 13.620 - - 11.420 - - 12.629 - - 14.341 - - - - - 14.341 - - 173.272 - - - - - - - - - - - - - - - Subtotal: 1) Ammo Modernization - - 190.889 - - 17.518 - - 18.467 - - 19.009 - - - - - 19.009 Total - - 190.889 - - 17.518 - - 18.467 - - 19.009 - - - - - 19.009 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) The Ammo Modernization budget supports a level of effort program; this includes unforeseen requirement updates during the year of execution. The United States Marine Corps (USMC), Program Manager - Ammunition is responsible for the entire life cycle of the ammunition inventory. This is an on-going effort and is required for as long as the USMC maintains ammunition. The Ammo Modernization budget pays for necessary technical and programmatic services. (2) Funding for AM03 ESED SUPPORT provides for the Marine Corps' designated In-Service Engineering Agent (ISEA) for conventional ground ammunition. The requested increase of $1.712M from FY 2026 is required to support the InService Engineering efforts of the Light Assault Weapon Fire From Enclosure which is starting production. The increase in funding also supports an expansion of condition-based surveillance of the production stockpile which uses passive and active monitoring of production, and rapid feedback from fleet at major training activities within the continuing production window and warranty periods. LI 1630 - Ammo Modernization Navy UNCLASSIFIED Page 4 of 4 P-1 Line #21 Volume 1 - 370 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,036.817 179.590 1,036.817 179.590 1,036.817 179.590 147.473 147.473 147.473 723.278 - 0.000 - 723.278 - 0.000 - 723.278 0.000 723.278 723.278 723.278 288.384 288.384 288.384 292.371 292.371 292.371 297.046 297.046 297.046 To FY 2031 Complete 310.099 Continuing 310.099 310.099 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These munitions are all procured via Joint Program Executive Office, Armament and Ammunition (JPEO A&A) / Single Manager for Conventional Ammunition (SMCA) and the unit costs are pre-negotiated in the contract established by the SMCA. The procurements support of Force Design and Marine Corps readiness to address Littoral Operations in Contested Environments and Indo-Pacific, the Family of Artillery Munitions includes all 155MM artillery ammunition components. The 155MM artillery components are fired from M777 Howitzers, and include: primer, propellant, projectile, and fuze. These munitions have a procurement lead-time of 48-60 months. LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 1 of 31 P-1 Line #22 Volume 1 - 371 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Artillery, All Types P-5a, P-21 - / 707.161 - / 167.258 P-5 1 / Fuze, All Types P-5a - / 329.656 - / 12.332 P-40 Total Gross/Weapon System Cost / 1,036.817 - / 179.590 - - / 145.473 - - - / 2.000 / 147.473 / 721.565 - - - / - / 1.713 - / 0.000 / 723.278 - / 0.000 - / 721.565 - - / 1.713 / 723.278 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 baseline funds for the 1650 Artillery budget support the Total Munitions Requirement (TMR), the Marine Corps' Approved Acquisition Objective. The TMR is the total number of rounds required for combat-ready forces. These funds replenish munitions expended in annual training and support deployment preparation, readiness, munitions lifecycle management and operational needs. FY 2027 Baseline Appropriation Request: $723.278M. The budget increase of $575.805M from FY 2026 to FY2027 is due to increased requirements as a result of a 2023 National Defense Authorization Act (NDAA) requirement for protracted warfare scenarios, calculated by doubling the duration of each applicable operation plan. This amendment has increased the requirement of key low-density, high-cost munitions. Additionally, artillery requirements increased due to the updated battery transition plan. Current inventories do not meet this requirement. FY 2027 Baseline funding will support the procurement of the following 155MM ammunition, all types. -DODIC D528 155MM M825 WP Smoke projectiles, provides screening capability to obscure friendly troop and vehicle movements. The FY 2027 funding request is $3.845M. The increase from FY 2026 to FY 2027 is to replace expiring inventory and training expenditures. -DODIC D529 155MM High Explosive (HE) M795 w/TNT projectiles. The FY 2027 funding request is $288.131M. Which supports both training and war reserve requirements. The funding increase from FY 2026 to FY 2027 is to support procurements to replace expiring inventory and training expenditures. -DODIC DA67 CHG PROP 155MM Modular Artillery Charge System (MACS) M232A2 propellants. The FY 2027 funding request $17.732M. Which are the charges for all ammunition used in the 155MM Howitzer. The funding increase from FY 2026 to FY 2027 is due to the constrained training at the medium/high zone, therefore the training replenishment for this charge is reduced. -DODIC DD01 (DA78) 155MM HE Advanced Submunition XM1208 projectiles. The FY 2027 funding request is $104.491M. The funding increase from FY 2026 to FY 2027 supports the inventory establishment as the replacement for the legacy Dual Purpose Improved Conventional Munitions (DPICM) rounds. -DODIC DA12 Propellant Charge 155mm, Modular Artillery Charge System M231. The FY 2027 funding request is $119.696M. The funding increase from FY 2026 to FY 2027 is necessary to correct inventory shortfalls projected to begin in FY 2027. The procurement will ensure sufficient inventory is available to meet annual training, readiness, and operational requirements while also replacing munitions consumed by service life and testing. FY 2027 Baseline funding for the engineering support in production (ESIP) of the following 155MM ammunition. Per the Joint Conventional Ammunition Policies and Procedures, ESIP is required until deliveries are complete. -DODIC DA66 155MM M1121 WP Smoke projectiles. The FY 2027 funding request is $1.046M. The decrease from FY 2026 to FY 2027 is to provide an extended range capability over the legacy D550. LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 2 of 31 P-1 Line #22 Volume 1 - 372 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A -DODIC N340 M739A1 Point Detonating (PD) Fuzes. The FY 2027 funding request is $1.002M. The increase in funding from FY 2026 to FY 2027 supports the primary training fuze for all 155MM rounds. -DODIC NA37 M1156 Precision Guidance Kit (PGK) Fuzes. The FY 2027 funding request is $.711M. The decrease in funding from FY 2026 to FY 2027 provides a first-of-its-kind "near-precision" capability with M-code GPS. Funding is also provided for First Destination Transportation as needed to support emergent shipments. The cost elements are consolidated to complete round/total hardware and production support costs to be in line with other budget line items. Additionally, removing the component breakout provides clear visibility of the final deliverable quantities and total unit costs. LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 3 of 31 P-1 Line #22 Volume 1 - 373 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Artillery, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 2) D528 Projectile, 155MM Smoke White Phosphorus M825 2.1) D528 Complete Round (1)(†) A 2.2) D528 Production Support A 2.3) D528 Acceptance Testing A Subtotal: 2) D528 Projectile, 155MM Smoke White Phosphorus M825 - - - - - - - - - - - 3.460 - - 1.002 - - 1.069 - - 0.285 - - - - - - - 3.745 - - 1.002 - 3,443.80 857 2.951 - - - - - 0.894 - - - - - - - - - - 1.069 - - 3.845 - 3,443.80 857 2.951 - - 0.894 - - - - - - - - 3.845 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 A (†) LAP 3.2) D529 M795 Metal Parts (†) 3.3) D529 TNT Supplemental A A (†) Charge 3.4) D529 Complete Round (2)(†) A 3.5) D529 Production Support A 3.6) D529 Acceptance Testing A Subtotal: 3) D529 155MM HE M795 w/ TNT 284.75 410,060 116.765 413.36 6,458 2.669 - - - - - - - - - - - - 394.20 265,641 104.716 986.64 6,587 6.499 - - - - - - - - - - - - 12.78 250,139 3.196 42.48 6,586 0.280 - - - - - - - - - - - - 7,869 12.331 280.600 - - - - - - - - - 1,567.06 1,709.38 164,153 - - 7.168 - - 0.547 - - 0.543 - - 7.531 - - - - - 7.531 - - 2.230 - - 0.030 - - - - - - - - - - - - - - 234.075 - - 10.025 - - 12.874 - - - - - - - - - - 359.41 7,962 2.862 - - - - - - - - - - - - - - - 136.15 8,201 1.117 - - - - - - - - - - - - - - - 124.27 2,070 0.257 - - - - - - - - - - - - - - - 18.86 513 0.010 - - - - - - - - - - - - - - - - - - 511.93 65.129 522.54 118.384 - - - 522.54 - - - - - 0.089 - - 0.892 - - 1.312 - - - - - 1.312 - - - - - 0.027 - - - - - - - - - - - - 288.131 1,709.38 164,153 280.600 288.131 4) DA12 Charge, Propelling, 155MM MACS 4.1) DA12 Load (†) A Assemble Pack 4.2) DA12 Combustible Cases M231 (†) 4.3) DA12 Container M231 A (†) 4.4) DA12 Ignition Propellant MACS (†) 4.5) DA12 Complete Charge (3)(†) A A A 4.6) DA12 Production Support A 4.7) DA12 Acceptance Testing A LI 1650 - Artillery Munitions Navy 127,222 UNCLASSIFIED Page 4 of 31 226,554 P-1 Line #22 226,554 118.384 Volume 1 - 374 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Subtotal: 4) DA12 Charge, Propelling, 155MM MACS ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Artillery, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) - - 0.000 - - 4.362 - - 66.021 - - 547.71 6,854 3.754 - - - - - - - - 8.73 13,982 0.122 - - - - - - - 770.03 11,084 8.535 - - - - - - 63.65 13,982 0.890 - - - - - 145.29 1,411 0.205 - - - - 237.73 13,982 3.324 - - - - - 4.938 - - - - 0.134 - - - 21.902 FY 2027 OOC Total Cost Unit Cost ($ M) ($) 119.696 Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - 119.696 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.051 - - 1.047 - - 1.046 - - - - - 1.046 - - - - - - - - - - - - - - - - 1.051 - - 1.047 - - 1.046 - - - - - 1.046 5) DA66, 155MM WP Smoke ER, 1121 5.1) DA66 Load, Assemble and Pack A (†) (LAP) 5.2) DA66 Meltable Fuze Plug A 5.3) DA66 Cannister Metal Part Set A 5.4) DA66 Modified Supplemental Charge, PBXN9 A 5.5) DA66 Wooden A (†) Pallet, IMX 5.6) DA66 Modified Projectile Body A 5.8) DA66 Production Support A 5.9) DA66 Acceptance Testing A Subtotal: 5) DA66, 155MM WP Smoke ER, 1121 6) DA67, Chg Prop 155MM (MACS) M232A2 6.1) DA67 Load, Assemble, Pack A (†) (LAP) 6.2) DA67, Propellant, M31A2 (†) 6.3) DA67 Container, M232A1 (†) 6.4) DA67 Combustible Cases F/155MM A A A (†) 6.5) DA67 Ignition (†) A Propellant, MACS 6.6) DA67 Complete Charge (4)(†) A 6.7) DA67 Production Support A 6.8) DA67 Acceptance Testing A LI 1650 - Artillery Munitions Navy 46.08 148,400 6.838 63.99 36,000 2.304 - - - - - - - - - - - - 24.96 765,000 19.091 28.60 550,000 15.730 - - - - - - - - - - - - 116.35 53,916 6.273 124.20 23,000 2.857 - - - - - - - - - - - - 78.43 229,496 17.999 108.45 115,000 12.472 - - - - - - - - - - - - 11.83 12,600 0.149 18.86 7,000 0.132 - - - - - - - - - - - - - - - - - - 377.42 44,292 16.717 421.21 40,107 16.893 - - - 421.21 40,107 16.893 - - 3.572 - - 0.696 - - 0.840 - - 0.839 - - - - - 0.839 - - 1.819 - - 0.727 - - - - - - - - - - - - UNCLASSIFIED Page 5 of 31 P-1 Line #22 Volume 1 - 375 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Subtotal: 6) DA67, Chg Prop 155MM (MACS) M232A2 - Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Artillery, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) - 55.741 - - 34.918 - - 17.557 9,889 40.014 - - - - - - - - 0.152 - - - - - - - - 40.166 - - - - - - - - - 1,733 25.029 2,842 45.266 - - - - - 0.337 - - 1.639 - - - - - 0.144 - - - - 0.000 - - 25.510 - - Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - 17.732 - - - 47,209 186.622 - - - - - 0.002 - - - - - 186.624 - - - 5,700 101.806 - - - - - 2.685 - - - - - - - - - - 46.905 - - - - Qty (Each) Total Cost ($ M) - 17.732 47,209 186.622 - - 0.002 - - 186.624 5,700 101.806 - - 2.685 - - - - - - - - 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5)(†) 7.2) DA70 Production Support A 4,046.31 A Subtotal: 7) DA70 155MM Extended Range HE Projectile M1128 3,953.10 3,953.10 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6)(†) A 8.2) DA78 Production Support A 8.3) DA78 Acceptance Testing A Subtotal: 8) DA78, Projectile 155MM, CDAEM XM1208 14,442.65 15,927.61 17,860.70 104.491 17,860.70 104.491 9) PD Replenishment (Ukraine) 9.1) Tranche 25 D529 Complete Round (†) 9.2) Tranche 25 DA70 Complete Round (†) 9.3) Tranche 25 DA67 Complete Charge (†) 9.4) Tranche 25 DA12 Complete Charge (†) A A A A 9.5) Tranche 25 DA13 Complete Charge A 9.6) Tranche 26 D529 A Complete Round (†) 9.7) Tranche 29 D529 Complete Round (†) 9.8) Tranche 29 DA12 Complete Round (†) 9.9) Tranche 29 DA67 Complete Round (†) 9.10) Tranche 29 DA70 Complete Round A A A A (†) LI 1650 - Artillery Munitions Navy 1,957.00 107,966 211.289 - - - - - - - - - - - - - - - 3,949.33 1,559 6.157 - - - - - - - - - - - - - - - 351.93 60,631 21.338 - - - - - - - - - - - - - - - 506.50 183,992 93.192 - - - - - - - - - - - - - - - - 2.048 - - - - - - - - - - - - - - - 2,508 4.908 - - - - - - - - - - - - - - - - - - 2,016.35 24,746 49.897 - - - - - - - - - - - - - - - 544.88 18,717 10.199 - - - - - - - - - - - - - - - 416.76 26,655 11.109 - - - - - - - - - - - - - - - 3,953.20 4,853 19.185 - - - - - - - - - - - - 1,956.94 UNCLASSIFIED Page 6 of 31 P-1 Line #22 Volume 1 - 376 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Subtotal: 9) PD Replenishment (Ukraine) ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Artillery, All Types FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 338.932 - - 90.390 - - - - - - - - - - - - - - 12.600 - - - - - - - - - - - - - - - Subtotal: 10) Israel Funding - Navy - - 12.600 - - - - - - - - - - - - - - Total - - 707.161 - - - - - - - - - - - 10) Israel Funding - Navy 10.1) Israel Funding Navy A 167.258 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 145.473 721.565 721.565 indicates the presence of a P-5a Footnotes: (1) (2) (D528 Complete Round) The funding increase for DODIC D528, from FY 2026 to FY 2027, supports procurements to replace expiring inventory and training expenditures. (D529 Complete Round) The funding increase of $275.257M for DODIC D529 from FY2026 to FY2027 is to address critical inventory shortfalls as well as support the Marine Corps' updated artillery battery transition plan. As part of Force Design, the Marine Corps has increased the number of cannon batteries requiring additional artillery ammunition to support fleet readiness. The hardware unit cost increase for DODIC D529 from FY2026 to FY2027 is a direct consequence of unprecedented strain on the global and domestic defense industrial base, driven by a confluence of factors including heightened geopolitical conflict, supply chain bottlenecks for critical materials, and the intensive capital and labor costs associated with rapidly scaling up production. A primary driver of the unit cost increase is the direct result of strategic investments to mitigate critical supply chain vulnerabilities in both energetics and metal parts manufacturing. A primary cost driver is the global demand for TNT, as well as the forging and machining capacity for the projectile's HF-1 steel bodies and higher Load, Assemble, and Pack (LAP) costs from running facilities at maximum capacity. The price increase reflects a direct investment in a more resilient and responsive domestic supply chain. (3) (DA12 Complete Charge) The FY 2027 funding increase for DA12 is due to shortfalls in the inventory beginning in FY 2026 and is required to replenish munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. (4) (DA67 Complete Charge) The FY 2027 funding increase of $0.175M for DODIC DA67 is due to shortfalls in the inventory beginning in FY 2026 and is required to replenish munitions expended through the year in support of training, deployment preparation and readiness, service life and other testing requirements, and operational requirements. The hardware unit cost increase for DODIC DA67 from FY2026 to FY2027 is due to higher load, assemble, pack and propellant sourcing costs due to increased global demand. (5) (DA70 Complete Round) The funding increase of $186.624M for DODIC DA70 from FY2026 to FY2027 is to fulfill the new war reserve munition requirement of the TMR for 155mm High Explosive projectiles. The DA70 provides a longer range capability over the legacy D529 projectile in contested environments. (6) (DA78 Complete Round) The funding increase of $57.586M for DODIC DA78 from FY2026 to FY2027 is to fulfill the new war reserve munition requirement of the TMR to replace the legacy Dual Purpose Improved Conventional Munition (DPICM) rounds. The hardware unit cost increase for DODIC DA78 from FY2026 to FY2027 is a direct and unavoidable consequence of compounding geopolitical and economic pressures impacting its sole-source production line in Israel. The price adjustment is driven by the acute security situation in the region, which has introduced significant risk and cost into the manufacturing and logistics chain, compounded by the same global material shortages affecting all ammunition production. LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 7 of 31 P-1 Line #22 Volume 1 - 377 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 1650 / Artillery Munitions Method/Type or Funding Vehicle Location of PCO Aggregated Items: Artillery, All Types Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 2) D528 Projectile, 155MM Smoke White Phosphorus M825 2.1) D528 Complete Round (1) 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2027 857 3,443.80 Y 2024 AMERICAN ORDANCE / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2024 Sep 2026 3,395 436.32 Y 2025 AMERICAN ORDANCE / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2030 6,458 413.36 Y 2020 GENERAL DYNAMICS OTS / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Feb 2021 Aug 2025 136,680 380.04 Y 2021 GENERAL DYNAMICS OTS / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Feb 2021 Aug 2025 20,290 410.57 Y 2022 GENERAL DYNAMICS OTS / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Jun 2022 Dec 2026 15,610 435.20 Y 2024 GENERAL DYNAMICS OTS / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2030 3,463 986.06 Y 2025 GENERAL DYNAMICS OTS / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2030 6,587 986.64 Y 2024 SPECTRA TECHNOLOGIES / CAMDEN, AR C / IDIQ ROCK ISLAND ARSENAL, IL Apr 2024 Oct 2025 3,463 33.58 Y 2025 SPECTRA TECHNOLOGIES / CAMDEN, AR C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Mar 2027 6,586 42.48 Y 2026 AMERICAN ORDNANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 7,869 1,567.06 Y 2027 AMERICAN ORDNANCE LLC (IAAP) / MIDDLETOWN, IA C / TBD ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2029 164,153 1,709.38 Y 2025 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2031 7,962 359.41 Y 2025 ARMTEC DEFENSE, INC. / COACHELLA, CA C / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 8,201 136.15 Y 2025 ARMTEC DEFENSE, INC. / COACHELLA, CA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2026 2,070 124.27 Y 2025 ST MARKS POWDER INC / CRAWFORDVILLE, FL C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2026 513 18.86 Y 2026 TBD / TBD C / IDIQ PICATINNEY ARSENAL Mar 2026 Jan 2032 127,222 511.93 Y 2027 TBD / TBD C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Jan 2033 226,554 522.54 Y 3) D529 155MM HE M795 w/TNT (†) 3.1) D529 M795 LAP (†) 3.1) D529 M795 LAP (†) 3.2) D529 M795 Metal Parts (†) 3.2) D529 M795 Metal Parts (†) 3.2) D529 M795 Metal Parts (†) 3.2) D529 M795 Metal Parts (†) 3.2) D529 M795 Metal Parts 3.3) D529 TNT Supplemental (†) Charge 3.3) D529 TNT Supplemental (†) Charge 3.4) D529 Complete Round (2)(†) 3.4) D529 Complete Round (2)(†) 4) DA12 Charge, Propelling, 155MM MACS 4.1) DA12 Load Assemble Pack 4.2) DA12 Combustible Cases M231 4.3) DA12 Container M231 4.4) DA12 Ignition Propellant MACS 4.5) DA12 Complete Charge (3)(†) 4.5) DA12 Complete Charge (3)(†) LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 8 of 31 P-1 Line #22 Volume 1 - 378 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1650 / Artillery Munitions Method/Type or Funding Vehicle Location of PCO Aggregated Items: Artillery, All Types Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 5.1) DA66 Load, Assemble and Pack (LAP) 2022 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2022 Feb 2026 2,841 523.92 Y 5.1) DA66 Load, Assemble and Pack (LAP) 2023 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2023 Feb 2027 4,013 564.58 Y 2023 KNOX CNTY ASSOC RETARDED CITIZENS / VINCENNES, IN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2023 Mar 2024 521 0.00 Y 2020 AMERICAN ORDANCE / MIDDLETOWN, IA C / IDIQ PICATINNY ARSENAL, NJ May 2020 May 2026 20,400 35.00 Y 2020 AMERICAN ORDANCE / MIDDLETOWN, IA C / IDIQ PICATINNY ARSENAL, NJ May 2020 May 2026 10,050 35.00 Y 6.1) DA67 Load, Assemble, Pack (LAP) 2022 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Jul 2022 Jul 2029 65,950 45.74 Y 6.1) DA67 Load, Assemble, Pack (LAP) 2024 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2024 Sep 2034 52,000 52.98 Y 6.1) DA67 Load, Assemble, Pack (LAP) 2025 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2035 36,000 63.99 Y 2020 GENERAL DYNAMICS OTS / CANADA C / IDIQ PICATINNY ARSENAL, NJ Mar 2020 Nov 2026 99,000 19.78 Y 2020 GENERAL DYNAMICS OTS / CANADA C / IDIQ PICATINNY ARSENAL, NJ Mar 2020 Nov 2026 51,000 19.78 Y 2022 GENERAL DYNAMICS OTS / CANADA C / IDIQ PICATINNY ARSENAL, NJ Sep 2022 Apr 2029 335,000 22.53 Y 2024 GENERAL DYNAMICS OTS / CANADA C / IDIQ PICATINNY ARSENAL, NJ May 2024 May 2030 280,000 30.63 Y 2025 GENERAL DYNAMICS OTS / CANADA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2031 550,000 28.60 Y 2025 CONCO, INC / LOUISVILLE, KY C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2026 23,000 124.20 Y 2025 ARMTEC DEFENSE, INC. / COACHELLA, CA C / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Mar 2026 115,000 108.45 Y 2025 ST MARKS POWDER, INC. / CRAWFORDVILLE, FL C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2026 7,000 18.86 Y 2026 AMERICAN ORDANCE / Middletown, IA C / TBD ROCK ISLAND ARSENAL, IL Oct 2025 Jan 2031 44,292 377.42 Y 2027 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2032 40,107 421.21 Y (Each) RFP Issue Date 5) DA66, 155MM WP Smoke ER, 1121 5.5) DA66 Wooden Pallet, IMX 6) DA67, Chg Prop 155MM (MACS) M232A2 6.1) DA67 Load, Assemble, Pack (LAP) 6.1) DA67 Load, Assemble, Pack (LAP) ✓ (†) 6.2) DA67, Propellant, M31A2 (†) 6.2) DA67, Propellant, M31A2 (†) 6.2) DA67, Propellant, M31A2 (†) 6.2) DA67, Propellant, M31A2 (†) 6.2) DA67, Propellant, M31A2 6.3) DA67 Container, M232A1 6.4) DA67 Combustible Cases F/155MM (†) 6.5) DA67 Ignition Propellant, MACS 6.6) DA67 Complete Charge (4)(†) 6.6) DA67 Complete Charge (4)(†) ✓ 7) DA70 155MM Extended Range HE Projectile M1128 LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 9 of 31 P-1 Line #22 Volume 1 - 379 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Aggregated Items: Artillery, All Types FY Contractor and Location Method/Type or Funding Vehicle 2024 General Dynamics OTS / Camden, AR C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2024 Mar 2026 9,889 4,046.29 Y 2025 TOMER / TEL AVIV-JAFFA, ISRAEL SS / FFP PICATINNY ARSENAL, NJ Sep 2025 Sep 2027 1,733 14,442.65 Y 2026 TBD / TBD C / IDIQ PICATINNY ARSENAL, NJ May 2026 May 2028 2,842 15,927.61 Y 2027 TBD / TBD C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Mar 2029 5,700 17,860.70 Y 9.1) Tranche 25 D529 Complete Round 2024 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2024 Sep 2031 107,966 1,957.00 Y 9.2) Tranche 25 DA70 Complete Round 2024 GENERAL DYNAMICS / CAMDEN, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2030 1,559 3,949.17 Y 9.3) Tranche 25 DA67 Complete Charge 2024 General Dynamics OTS / Niceville, FL C / IDIQ PICATINNEY ARSENAL Aug 2024 Aug 2034 60,631 351.93 Y 9.4) Tranche 25 DA12 Complete Charge 2024 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2033 183,992 506.50 Y 9.6) Tranche 26 D529 Complete Round 2024 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2024 Sep 2028 2,508 1,957.00 Y 2025 AMERICAN ORDANCE / Middletown, IA C / IDIQ ROCK ISLAND ARSENAL, IL Jul 2025 Jul 2030 24,746 2,016.35 Y 2025 GENERAL DYNAMICS ATP / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Oct 2025 Oct 2030 18,717 544.88 Y 9.9) Tranche 29 DA67 Complete Round 2025 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA SS / FFP PICATINNY ARSENAL, NJ Jul 2025 Jul 2030 26,655 416.76 Y 9.10) Tranche 29 DA70 Complete Round 2025 AMERICAN ORDANCE LLC (IAAP) / MIDDLETOWN, IA SS / FFP PICATINNY ARSENAL, NJ Oct 2025 Aug 2028 4,853 3,953.20 Y Item Number / Title [DODIC] 7.1) DA70 Complete Round O O C P-1 Line Item Number / Title: 1650 / Artillery Munitions (5)(†) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6)(†) 8.1) DA78 Complete Round (6)(†) 8.1) DA78 Complete Round (6)(†) 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete (†) Round 9.8) Tranche 29 DA12 Complete (†) Round (†) indicates the presence of a P-21 LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 10 of 31 P-1 Line #22 Volume 1 - 380 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 .000 3.395 3.395 20 2025 NAVY 6.458 .000 6.458 6.458 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 .000 136.680 A - - - - - - - - 136.680 21 2021 NAVY 20.290 .000 20.290 A - - - - - - - - 20.290 21 2022 NAVY 15.610 .000 15.610 15.610 21 2024 NAVY 3.463 .000 3.463 3.463 21 2025 NAVY 6.587 .000 6.587 6.587 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 .000 3.463 3.463 22 2025 NAVY 6.586 .000 6.586 6.586 .000 7.869 7.869 .000 164.153 164.153 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 127.222 24 2027 NAVY 226.554 .000 226.554 226.554 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 .000 99.000 A - - - - - - - - - - - - - - - - - - - ✓ 25 2020 NAVY 51.000 .000 51.000 A - - - - - - - - - - - - - - - - - - - 99.000 25 2022 NAVY 335.000 .000 335.000 335.000 25 2024 NAVY 280.000 .000 280.000 280.000 25 2025 NAVY 550.000 .000 550.000 550.000 51.000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 .000 115.000 115.000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 381 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (4) 28 2026 NAVY 44.292 .000 44.292 44.292 27 2027 NAVY 40.107 .000 40.107 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY .000 9.889 9.889 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 .000 1.733 1.733 30 2026 NAVY 2.842 .000 2.842 2.842 30 2027 NAVY 5.700 .000 5.700 5.700 .000 24.746 24.746 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 .000 18.717 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 382 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 .000 3.395 3.395 20 2025 NAVY 6.458 .000 6.458 6.458 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 .000 136.680 - - - - - - - - - - - - - - - - - - - - - - - - 136.680 21 2021 NAVY 20.290 .000 20.290 - - - - - - - - - - - - - - - - - - - - - - - - 20.290 21 2022 NAVY 15.610 .000 15.610 A - - - - - - - - - - - - - - - - 15.610 21 2024 NAVY 3.463 .000 3.463 3.463 21 2025 NAVY 6.587 .000 6.587 6.587 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 .000 3.463 3.463 22 2025 NAVY 6.586 .000 6.586 6.586 .000 7.869 7.869 .000 164.153 164.153 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 127.222 24 2027 NAVY 226.554 .000 226.554 226.554 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 .000 99.000 - - - - - - - - - - - - - - - - - - - - - - - - ✓ 25 2020 NAVY 51.000 .000 51.000 - - - - - - - - - - - - - - - - - - - - - - - - 99.000 51.000 25 2022 NAVY 335.000 .000 335.000 A - - - - - - - - - - - - - 335.000 25 2024 NAVY 280.000 .000 280.000 280.000 25 2025 NAVY 550.000 .000 550.000 550.000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 .000 115.000 115.000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 383 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (4) 28 2026 NAVY 44.292 .000 44.292 44.292 27 2027 NAVY 40.107 .000 40.107 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY .000 9.889 9.889 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 .000 1.733 1.733 30 2026 NAVY 2.842 .000 2.842 2.842 30 2027 NAVY 5.700 .000 5.700 5.700 .000 24.746 24.746 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 .000 18.717 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 384 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 .000 3.395 20 2025 NAVY 6.458 .000 6.458 A - - - - - - - - - - - - - 3.395 A - - 6.458 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 .000 136.680 - - - - - - - - - - - - - - - - - - - - - - 15.000 15.000 106.680 21 2021 NAVY 20.290 .000 20.290 - - - - - - - - - - - - - - - - - - - - - - 1.690 21 2022 NAVY 15.610 .000 15.610 - - - - - - - - - - - - - - - - - - - - - - - - 15.610 21 2024 NAVY 3.463 .000 3.463 A - 3.463 21 2025 NAVY 6.587 .000 6.587 A - 6.587 - 3.463 A - 6.586 1.690 16.910 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 .000 3.463 22 2025 NAVY 6.586 .000 6.586 .000 7.869 7.869 .000 164.153 164.153 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 A - - - - - - - - - - - - - - - - - 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 127.222 24 2027 NAVY 226.554 .000 226.554 226.554 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 .000 99.000 - - - - - - - - - - - - - - - - - - - - - - - - ✓ 25 2020 NAVY 51.000 .000 51.000 - - - - - - - - - - - - - - - - - - - - - - - - 99.000 51.000 25 2022 NAVY 335.000 .000 335.000 - - - - - - - - - - - - - - - - - - - - - - - - 335.000 25 2024 NAVY 280.000 .000 280.000 A - - - - - - - - - - - - - - - - 25 2025 NAVY 550.000 .000 550.000 - 280.000 A - 550.000 - 115.000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 .000 115.000 A O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 385 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (4) 28 2026 NAVY 44.292 .000 44.292 44.292 27 2027 NAVY 40.107 .000 40.107 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY .000 9.889 A - - - - - - - - - - - - - - - - - - - 9.889 A - 1.733 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 .000 1.733 30 2026 NAVY 2.842 .000 2.842 2.842 30 2027 NAVY 5.700 .000 5.700 5.700 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 .000 24.746 A - - - 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 .000 18.717 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 386 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 .000 3.395 - - - - - - - - - - - 3.395 20 2025 NAVY 6.458 .000 6.458 - - - - - - - - - - - - .000 - - - - - - - - - - - - 6.458 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 30.000 106.680 15.000 15.000 15.000 15.000 15.000 15.000 15.000 1.680 21 2021 NAVY 20.290 3.380 16.910 1.690 1.690 1.690 1.690 1.690 1.690 1.690 1.690 1.690 1.700 .000 21 2022 NAVY 15.610 .000 15.610 - - - - - - - - - - - - - - 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 2.610 21 2024 NAVY 3.463 .000 3.463 - - - - - - - - - - - - - - - - - - - - - - - - 3.463 21 2025 NAVY 6.587 .000 6.587 - - - - - - - - - - - - - - - - - - - - - - - - 6.587 - - - - - - - - - - - - - - - - 3.000 3.586 A - - - - - - - - - - .000 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 .000 3.463 3.463 22 2025 NAVY 6.586 .000 6.586 - .000 7.869 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 .000 .000 164.153 .000 - - - - - - - 7.869 A - - - - - - - 164.153 - - - - - - - 127.222 A - - - - - - - 226.554 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 24 2027 NAVY 226.554 .000 226.554 A - - - - - - - - - - - - 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 .000 99.000 - - - - - - - - - - - - - 50.000 49.000 ✓ 25 2020 NAVY 51.000 .000 51.000 - - - - - - - - - - - - - 51.000 .000 25 2022 NAVY 335.000 .000 335.000 - - - - - - - - - - - - - - - - - - - - - - - - 335.000 25 2024 NAVY 280.000 .000 280.000 - - - - - - - - - - - - - - - - - - - - - - - - 280.000 25 2025 NAVY 550.000 .000 550.000 - - - - - - - - - - - - - - - - - - - - - - - - 550.000 .000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 .000 115.000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B 17.905 17.905 17.905 17.905 17.905 17.906 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 31 7.569 S E P .000 O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 387 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT O C T Calendar Year 2026 A - N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (4) 28 2026 NAVY 44.292 .000 44.292 27 2027 NAVY 40.107 .000 40.107 - - - - - - - - - - - - - - - - - - - - - - - 44.292 A - - - - - - - 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY .000 9.889 - - - - - 4.920 2.601 - - - - - - - 2.368 .000 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 .000 1.733 30 2026 NAVY 2.842 .000 2.842 30 2027 NAVY 5.700 .000 5.700 - - - - - - - - - - - - - - - - 1.733 .000 A - - - - - - - - - - - - - - - - - 2.842 A - - - - - - - 5.700 - - - - - - - 24.746 - 18.717 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 .000 24.746 - .000 18.717 A - - - - - - - - - - - - - - - - - 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 388 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 3.395 .000 20 2025 NAVY 6.458 .000 6.458 .000 - - - - - - - - - - - - - - - - - - - - - - - - 6.458 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 136.680 .000 21 2021 NAVY 20.290 20.290 .000 .000 21 2022 NAVY 15.610 13.000 2.610 1.300 1.310 21 2024 NAVY 3.463 .000 3.463 - - - - - - - - - - - - - - - - - - - - - - - - 3.463 21 2025 NAVY 6.587 .000 6.587 - - - - - - - - - - - - - - - - - - - - - - - - 6.587 .000 .000 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 3.463 .000 .000 22 2025 NAVY 6.586 6.586 .000 .000 .000 7.869 - - - - - - - 3.000 4.869 .000 164.153 - - - - - - - - - - - - - - - - - 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 .000 15.000 15.000 15.000 15.000 15.000 15.000 15.000 59.153 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 - - - - - - - - - - - - - - - - - - - - - - - - 127.222 24 2027 NAVY 226.554 .000 226.554 - - - - - - - - - - - - - - - - - - - - - - - - 226.554 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 99.000 .000 ✓ 25 2020 NAVY 51.000 51.000 .000 .000 25 2022 NAVY 335.000 .000 335.000 - - - - - - - - - - - - - - - - - - 25 2024 NAVY 280.000 .000 280.000 - - - - - - - - - - - - - - - - - - - - - - - - 280.000 25 2025 NAVY 550.000 .000 550.000 - - - - - - - - - - - - - - - - - - - - - - - - 550.000 .000 50.000 50.000 50.000 50.000 50.000 50.000 35.000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 115.000 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 389 === page 418 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (4) 28 2026 NAVY 44.292 .000 44.292 - - - - - - - - - - - - - - - - - - - - - - - - 44.292 27 2027 NAVY 40.107 .000 40.107 - - - - - - - - - - - - - - - - - - - - - - - - 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY 9.889 .000 .000 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 1.733 .000 30 2026 NAVY 2.842 .000 2.842 - - - - - - - .257 2.585 30 2027 NAVY 5.700 .000 5.700 - - - - - - - - - - - - - - - - - .522 .521 .521 .521 .521 .521 .521 2.052 .000 24.746 - - - - - - - - - - - - - - - - - - - - - - - - 24.746 - 18.717 .000 .000 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 .000 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 390 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G .538 .538 .538 .538 .538 .538 .538 .538 .538 .538 .538 .540 S E P 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 3.395 .000 20 2025 NAVY 6.458 .000 6.458 .000 - - - - - - - - - - .000 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 136.680 .000 .000 21 2021 NAVY 20.290 20.290 .000 .000 21 2022 NAVY 15.610 15.610 .000 21 2024 NAVY 3.463 .000 3.463 - - - - - 3.463 21 2025 NAVY 6.587 .000 6.587 - - - - - .548 .000 .000 .548 .548 .548 .548 .548 .548 .548 .548 .548 .548 .559 .000 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 3.463 .000 .000 22 2025 NAVY 6.586 6.586 .000 .000 7.869 .000 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 23 2027 NAVY 164.153 .000 105.000 59.153 15.000 15.000 10.000 10.000 9.153 .000 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 - - - - - - - - - - - - - - - - - - - - - - - - 127.222 24 2027 NAVY 226.554 .000 226.554 - - - - - - - - - - - - - - - - - - - - - - - - 226.554 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 99.000 .000 .000 ✓ 25 2020 NAVY 51.000 51.000 .000 .000 25 2022 NAVY 335.000 300.000 35.000 35.000 25 2024 NAVY 280.000 .000 280.000 - - - - - - - 25 2025 NAVY 550.000 .000 550.000 - - - - - - - .000 20.833 20.833 20.833 20.833 20.833 20.833 20.833 20.833 20.833 35.833 30.833 25.837 - - - - - - - - - - - .000 - - - - - 83.788 466.212 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 115.000 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 391 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (4) 28 2026 NAVY 44.292 .000 44.292 - - - - - - - - - - - - - - - 3.691 3.691 3.691 3.691 3.691 3.691 3.691 3.691 27 2027 NAVY 40.107 .000 40.107 - - - - - - - - - - - - - - - - - - - - - - - 3.691 11.073 - 40.107 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY 9.889 .000 .000 .000 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 1.733 .000 30 2026 NAVY 2.842 2.842 .000 30 2027 NAVY 5.700 3.648 2.052 .000 .521 .521 .521 .489 - - - - .000 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 .000 24.746 - - - - - 5.000 5.000 5.000 5.000 4.746 .000 - 5.000 5.000 5.000 3.717 O C T N O V D E C J A N 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 .000 18.717 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 31 S E P .000 F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 392 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 3.395 .000 .000 20 2025 NAVY 6.458 6.458 .000 .000 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 136.680 .000 .000 21 2021 NAVY 20.290 20.290 .000 .000 21 2022 NAVY 15.610 15.610 .000 .000 21 2024 NAVY 3.463 3.463 .000 .000 21 2025 NAVY 6.587 6.587 .000 .000 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 3.463 .000 .000 22 2025 NAVY 6.586 6.586 .000 .000 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 7.869 .000 .000 23 2027 NAVY 164.153 164.153 .000 .000 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 .000 127.222 - - - 24 2027 NAVY 226.554 .000 226.554 - - - 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.501 - - - - - - - - - - - - .000 18.879 18.879 18.879 18.879 18.879 18.879 18.879 18.879 18.879 56.643 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 99.000 .000 .000 ✓ 25 2020 NAVY 51.000 51.000 .000 .000 25 2022 NAVY 335.000 335.000 .000 .000 25 2024 NAVY 280.000 280.000 .000 .000 25 2025 NAVY 550.000 83.788 466.212 83.788 83.788 83.788 83.788 83.792 47.268 .000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 115.000 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 393 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT O C T Fiscal Year 2033 Calendar Year 2032 N O V D E C J A N F E B Calendar Year 2033 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B 3.602 3.591 3.591 3.591 3.591 3.591 3.591 3.591 3.591 3.591 3.591 .595 M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (4) 28 2026 NAVY 44.292 33.219 11.073 3.691 3.691 3.691 27 2027 NAVY 40.107 .000 40.107 - - - .000 - - .000 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY 9.889 .000 .000 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 1.733 .000 .000 30 2026 NAVY 2.842 2.842 .000 .000 30 2027 NAVY 5.700 5.700 .000 .000 .000 .000 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 18.717 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 394 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Artillery, All Types Fiscal Year 2034 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2033 1 OCT Fiscal Year 2035 Calendar Year 2034 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2035 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 3) D529 155MM HE M795 w/TNT 3.1) D529 M795 LAP Prior Years Deliveries: 406665 20 2024 NAVY 3.395 3.395 .000 .000 20 2025 NAVY 6.458 6.458 .000 .000 3.2) D529 M795 Metal Parts Prior Years Deliveries: 89598 21 2020 NAVY 136.680 136.680 .000 .000 21 2021 NAVY 20.290 20.290 .000 .000 21 2022 NAVY 15.610 15.610 .000 .000 21 2024 NAVY 3.463 3.463 .000 .000 21 2025 NAVY 6.587 6.587 .000 .000 3.3) D529 TNT Supplemental Charge Prior Years Deliveries: 246676 22 2024 NAVY 3.463 3.463 .000 .000 22 2025 NAVY 6.586 6.586 .000 .000 3.4) D529 Complete Round (2) 23 2026 NAVY 7.869 7.869 .000 .000 23 2027 NAVY 164.153 164.153 .000 .000 .000 .000 4) DA12 Charge, Propelling, 155MM MACS 4.5) DA12 Complete Charge (3) 24 2026 NAVY 127.222 127.222 24 2027 NAVY 226.554 169.911 56.643 18.879 18.879 18.885 .000 6) DA67, Chg Prop 155MM (MACS) M232A2 6.2) DA67, Propellant, M31A2 25 2020 NAVY 99.000 99.000 .000 .000 ✓ 25 2020 NAVY 51.000 51.000 .000 .000 25 2022 NAVY 335.000 335.000 .000 .000 25 2024 NAVY 280.000 280.000 .000 .000 25 2025 NAVY 550.000 550.000 .000 .000 6.4) DA67 Combustible Cases F/155MM Prior Years Deliveries: 229496 26 2025 NAVY 115.000 115.000 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 395 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Items (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 6.6) DA67 Complete Charge Aggregated Items: Artillery, All Types Fiscal Year 2034 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2033 1 OCT Fiscal Year 2035 Calendar Year 2034 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2035 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (4) 28 2026 NAVY 44.292 44.292 .000 .000 27 2027 NAVY 40.107 40.107 .000 .000 7) DA70 155MM Extended Range HE Projectile M1128 7.1) DA70 Complete Round (5) 29 2024 9.889 NAVY 9.889 .000 .000 8) DA78, Projectile 155MM, CDAEM XM1208 8.1) DA78 Complete Round (6) 31 2025 NAVY 1.733 1.733 .000 .000 30 2026 NAVY 2.842 2.842 .000 .000 30 2027 NAVY 5.700 5.700 .000 .000 .000 .000 9) PD Replenishment (Ukraine) 9.7) Tranche 29 D529 Complete Round 32 2025 NAVY 24.746 24.746 9.8) Tranche 29 DA12 Complete Round 33 2025 NAVY 18.717 18.717 .000 .000 O C T LI 1650 - Artillery Munitions Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #22 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 396 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Aggregated Items: Artillery, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial MSR For 2027 1-8-5 For 2027 MAX For 2027 1 AMERICAN ORDANCE MIDDLETOWN, IA 97,200 192,000 288,000 12 12 24 36 8 8 24 32 2 GENERAL DYNAMICS OTS - SCRANTON, PA 61,200 122,400 122,400 12 12 36 48 8 8 36 44 0 0 0 0 0 0 0 0 3 SPECTRA TECHNOLOGIES - CAMDEN, AR TBD ALT After Oct 1 Reorder ALT Prior to Oct 1 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 4 AMERICAN ORDNANCE LLC (IAAP) - MIDDLETOWN, IA 96,000 192,000 432,000 12 12 24 36 8 8 24 32 5 TBD - TBD 40,000 80,000 230,000 6 6 36 42 6 6 70 76 6 GENERAL DYNAMICS OTS - CANADA 360,000 600,000 960,000 6 6 60 66 6 6 60 66 0 0 0 0 0 0 0 0 7 ARMTEC DEFENSE, INC. COACHELLA, CA TBD 8 TBD - TBD 360,000 600,000 960,000 6 6 60 66 6 6 60 66 9 AMERICAN ORDANCE Middletown, IA 360,000 600,000 960,000 6 6 60 66 6 6 60 66 10 General Dynamics OTS Camden, AR 129,600 129,600 432,000 12 12 24 36 8 8 24 32 11 TBD - TBD 1,000 5,000 10,000 8 8 24 32 8 8 24 32 12 TOMER - TEL AVIV-JAFFA, ISRAEL 1,000 5,000 10,000 8 8 24 32 8 8 24 32 13 AMERICAN ORDANCE Middletown, IA 108,000 108,000 360,000 12 12 24 36 8 8 24 32 14 GENERAL DYNAMICS ATP HAMPTON, AR 30,000 60,000 100,000 6 6 36 42 6 6 36 42 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 27 of 31 P-1 Line #22 Volume 1 - 397 === page 426 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Fuze, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 12.332 2.000 1.713 0.000 1.713 - Gross/Weapon System Cost ($ in Millions) 329.656 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 329.656 Plus CY Advance Procurement ($ in Millions) - - - - - 12.332 2.000 1.713 0.000 1.713 - Total Obligation Authority ($ in Millions) 329.656 FY 2027 Total - - - - - 12.332 2.000 1.713 0.000 1.713 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - N340 Fuze Point Detonating M739A1 Cost Recurring Cost 1.1.1) N340 Complete Fuze (†) 76.87 448,430 34.473 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.2) N340 Production Support - - 2.045 - - 1.002 - - 0.995 - - 1.002 - - 0.000 - - 1.002 1.1.3) N340 Acceptance Testing - - 1.763 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 38.281 - - 1.002 - - 0.995 - - 1.002 - - 0.000 - - 1.002 Subtotal: Hardware - N340 Fuze Point Detonating M739A1 Cost - - 38.281 - - 1.002 - - 0.995 - - 1.002 - - 0.000 - - 1.002 11,095 72.783 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - NA36 Precision Guidance Kit (PGK) Cost Recurring Cost 2.1.1) NA36 Complete Fuze 6,559.98 2.1.2) NA36 Production Support - - 2.617 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1.3) NA36 Acceptance Testing - - 1.887 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 77.287 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - NA36 Precision Guidance Kit (PGK) Cost - - 77.287 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - NA37 PRECISION GUIDANCE KIT FUZE Cost LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 28 of 31 P-1 Line #22 Volume 1 - 398 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Fuze, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Recurring Cost 3.1.1) NA37 Complete Fuze (†) 6,922.95 623 4.313 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.1.2) NA37 Production Support - - 2.846 - - 1.012 - - 1.005 - - 0.711 - - 0.000 - - 0.711 Subtotal: Recurring Cost - - 7.159 - - 1.012 - - 1.005 - - 0.711 - - 0.000 - - 0.711 Subtotal: Hardware - NA37 PRECISION GUIDANCE KIT FUZE Cost - - 7.159 - - 1.012 - - 1.005 - - 0.711 - - 0.000 - - 0.711 Hardware - PD Replenishment - Ukraine Cost Recurring Cost 4.1.1) Tranche 25 N340 Complete Fuze (†) 4.1.2) Tranche 25 NA15 Complete Fuze (†) 4.1.3) Tranche 25 NA17 Complete Fuze (†) 4.1.4) Tranche 25 NA35 Complete Primer (†) 4.1.5) Tranche 26 N340 Complete Fuze (†) 4.1.6) Tranche 26 NA15 Complete Fuze (†) 4.1.7) Tranche 26 NA17 Complete Fuze (†) 4.1.8) Tranche 26 NA35 Complete Primer (†) 4.1.9) Tranche 27 N340 Complete Fuze (†) 96.36 164,487 15.850 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 920.21 61,476 56.571 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 865.87 30,850 26.712 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 49.59 208,691 10.349 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 96.36 29,036 2.798 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 920.08 3,516 3.235 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 865.87 101,675 88.037 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 49.59 68,098 3.377 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 117.63 10,579 1.244 - - 0.000 - - 0.000 - - 0.000 - - 0.000 LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 29 of 31 P-1 Line #22 Volume 1 - 399 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1650 / Artillery Munitions Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Fuze, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 4.1.10) Tranche 28 N340 Complete Fuze (†) 4.1.11) Tranche 27 NA17 Complete Fuze (†) 4.1.12) Tranche 28 NA17 Complete Fuze (†) 4.1.13) Tranche 27 NA35 Complete Primer (†) 4.1.14) Tranche 28 NA35 Complete Primer (†) Subtotal: Recurring Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 117.63 11,996 1.411 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 865.87 3,584 3.103 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 865.87 3,584 3.103 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 49.59 13,783 0.683 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 49.59 15,615 0.774 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 206.929 - - 10.318 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - PD Replenishment - Ukraine Cost - - 206.929 - - 10.318 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 329.656 - - 12.332 - - 2.000 - - 1.713 - - 0.000 - - 1.713 (†) indicates the presence of a P-5a LI 1650 - Artillery Munitions Navy UNCLASSIFIED Page 30 of 31 P-1 Line #22 Volume 1 - 400 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Cost Elements O O C P-1 Line Item Number / Title: 1650 / Artillery Munitions Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2020 ACTION MANUFACTURING, INC. / BRISTOL, PA C / IDIQ PICATINNY ARSENAL, NJ Jun 2020 Jun 2026 210,076 73.83 Y 2022 ACTION MANUFACTURING, INC. / BRISTOL, PA C / IDIQ PICATINNY ARSENAL, NJ Mar 2022 Mar 2025 147,778 77.09 Y 2024 ACTION MANUFACTURING, INC. / BRISTOL, PA C / IDIQ PICATINNY ARSENAL, NJ Jun 2024 Jun 2027 86,000 84.21 Y 2023 NORTHROP GRUMMAN INNOVATION SYSTEMS / PLYMOUTH, MN C / FFP PICATINNY ARSENAL, NJ Mar 2023 Mar 2025 623 6,923.35 Y 4.1.1) Tranche 25 N340 Complete Fuze 2024 ACTION MANUFACTURING, INC. / BRISTOL, PA C / IDIQ PICATINNEY ARSENAL Jun 2024 Jun 2030 164,487 96.36 Y 4.1.2) Tranche 25 NA15 Complete Fuze 2024 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2031 61,476 920.21 Y 4.1.3) Tranche 25 NA17 Complete Fuze 2024 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2031 30,850 865.87 Y 4.1.4) Tranche 25 NA35 Complete Primer 2024 SECURITY SIGNALS / CORDOVA, TN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2029 208,691 49.59 Y 4.1.5) Tranche 26 N340 Complete Fuze 2024 ACTION MANUFACTURING, INC. / BRISTOL, PA C / IDIQ PICATINNEY ARSENAL Jun 2024 Jun 2030 29,036 96.36 Y 4.1.6) Tranche 26 NA15 Complete Fuze 2024 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2031 3,516 920.21 Y 4.1.7) Tranche 26 NA17 Complete Fuze 2024 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2031 101,675 865.87 Y 4.1.8) Tranche 26 NA35 Complete Primer 2024 SECURITY SIGNALS INC / CORDOVA, TN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2029 68,098 49.59 Y 4.1.9) Tranche 27 N340 Complete Fuze 2025 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2029 10,579 117.63 Y 4.1.10) Tranche 28 N340 Complete Fuze 2025 TBD / TBD C / TBD ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2029 11,996 117.63 Y 4.1.11) Tranche 27 NA17 Complete Fuze 2025 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2025 Oct 2028 3,584 865.87 Y 4.1.12) Tranche 28 NA17 Complete Fuze 2025 L-3 HARRIS / PLANO, TX C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2025 Oct 2028 3,584 865.87 Y 4.1.13) Tranche 27 NA35 Complete Primer 2025 SECURITY SIGNALS INC / CORDOVA, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2025 Oct 2028 13,783 49.59 Y 4.1.14) Tranche 28 NA35 Complete Primer 2025 SECURITY SIGNALS INC / CORDOVA, TN C / IDIQ ROCK ISLAND ARSENAL, IL Oct 2025 Oct 2028 15,615 49.59 Y 1.1.1) N340 Complete Fuze 1.1.1) N340 Complete Fuze 1.1.1) N340 Complete Fuze 3.1.1) NA37 Complete Fuze LI 1650 - Artillery Munitions Navy Location of PCO Item Number / Title [DODIC]: 1 / Fuze, All Types UNCLASSIFIED Page 31 of 31 P-1 Line #22 RFP Issue Date Volume 1 - 401 === page 430 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 402 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1660 / Items less than $5 million Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 100.633 100.633 100.633 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 14.737 15.891 8.837 0.000 8.837 8.824 8.942 9.062 - - - - - - - - 14.737 15.891 8.837 0.000 8.837 8.824 8.942 9.062 - - - - - - - - 14.737 15.891 8.837 0.000 8.837 8.824 8.942 9.062 To FY 2031 Complete 9.243 Continuing - Continuing - 9.243 Continuing - Total - Continuing - - 9.243 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Items Less Than $5 Million budget is crucial for ensuring the operational readiness and lethality of the Marine Corps by funding distinct, mission-essential ammunition requirements. This funding provides for the First Destination Transportation Charge (FDTC), guaranteeing the timely and reliable delivery of ammunition from production facilities directly to our warfighters. Without it, the ammunition supply chain is broken. Funding also provides the mission-critical ammunition for the Marine Security Guard Battalion, ensuring Marines can execute their no-fail mission of protecting U.S. embassies and diplomatic personnel worldwide. In addition, this line item enhances the core marksmanship of the force by equipping the Marine Corps Competition Shooting Team with unique precision ammunition, which serves to test, validate, and pioneer advanced shooting techniques that are disseminated across the Corps. LI 1660 - Items less than $5 million Navy UNCLASSIFIED Page 1 of 3 P-1 Line #23 Volume 1 - 403 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1660 / Items less than $5 million Appropriation / Budget Activity / Budget Sub Activity: 1508N: Procurement of Ammo, Navy & MC / BA 02: Proc Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items less than $5 million - / 100.633 - / 14.737 - / 15.891 - / 8.837 P-40 Total Gross/Weapon System Cost - / 100.633 - / 14.737 - / 15.891 - / 8.837 - / - - / 8.837 / 0.000 - / 8.837 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 Baseline Appropriation Request: $8.837M The FY2027 baseline funding will procure match ammunition and components for the Marine Corps Rifle Team. Funds will continue to provide First Destination Transportation (FDT) of items delivering in FY2027 and Marine Security Guard Battalion requirements procured through the U.S. State Department. The FY2027 budget request reflects a $7.054M decrease in First Destination Transportation costs, based on a detailed analysis of the planned ammunition procurement portfolio and updated transportation rate projections. LI 1660 - Items less than $5 million Navy UNCLASSIFIED Page 2 of 3 P-1 Line #23 Volume 1 - 404 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1660 / Items less than $5 million Appropriation / Budget Activity / Budget Sub Activity: 1508N / 02 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Items less than $5 million FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) Qty ($) (Each) Total Cost ($ M) 1) Items less than $5 million 1.1) A001, RIFLE TEAM AMMUNITION A - - 2.650 - - 0.297 - - 0.301 - - 0.310 - - - - - 0.310 - - 74.869 - - 12.852 - - 13.977 - - 6.866 - - - - - 6.866 - - 10.928 - - 1.588 - - 1.613 - - 1.661 - - - - - 1.661 - - 12.186 - - - - - - - - - - - - - - - Subtotal: 1) Items less than $5 million - - 100.633 - - 14.737 - - 15.891 - - 8.837 - - - - - 8.837 Total - - 100.633 - - 14.737 - - 15.891 - - 8.837 - - - - - 8.837 1.2) FDTC, FIRST DESTINATION TRANSPORTATION CHARGE (1) 1.3) MSGB, MARINE SECURITY GUARD BATTALION AMMO A 1.4) Prior Year Cumulative Total A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) The FY27 budget request reflects a $7.117M decrease in First Destination Transportation costs, based on a detailed analysis of the planned ammunition procurement portfolio and updated transportation rate projections. LI 1660 - Items less than $5 million Navy UNCLASSIFIED Page 3 of 3 P-1 Line #23 Volume 1 - 405 === page 434 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 406