=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 5 of 5 Other Procurement, Navy Budget Activities 05−08 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activity 01............................................................................................................................................................. Volume 1 Budget Activity 02............................................................................................................................................................. Volume 2 Budget Activity 03............................................................................................................................................................. Volume 3 Budget Activity 04............................................................................................................................................................. Volume 4 Budget Activities 05-08.....................................................................................................................................................Volume 5 UNCLASSIFIED Volume 5 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 5 Table of Contents Cost of Report............................................................................................................................................................. Volume 5 - v Introduction and Explanation of Contents..............................................................................................................Volume 5 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 5 - ix Master Line Item Table of Contents (by Appropriation then Line Number)...........................................................Volume 5 - li Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................. Volume 5 - lxi Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 5 - lxix Line Item Table of Contents (Alphabetically by Line Item Title)....................................................................... Volume 5 - lxxiii Executive Summary................................................................................................................................................Volume 5 - lxxv Exhibit P-40s................................................................................................................................................................ Volume 5 - 1 UNCLASSIFIED Volume 5 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - iv === page 7 === OPN 1 OPN 2 OPN 3 OPN 4 OPN 5-8 The estimated cost of this report for the Department of the Navy (DON) is $58,268. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $58,268 The estimated cost of this report for the Department of the Navy (DON) is $100,759. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $100,759 The estimated cost of this report for the Department of the Navy (DON) is $23,118. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $23,118 The estimated cost of this report for the Department of the Navy (DON) is $38,526. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $38,526 The estimated cost of this report for the Department of the Navy (DON) is $29,304. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $29,304 Volume 5 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - vi === page 9 === Department of Defense Appropriations Act, 2027 Other Procurement, Navy For procurement, production, and modernization of support equipment and materials not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships, and ships authorized for conversion); the purchase of passenger motor vehicles for replacement only; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $18,866,679 to remain available for obligation until September 30, 2029, of which $0 shall be available for the Navy Reserve and the Marine Corps Reserve: Provided, That such funds are also available for the maintenance, repair, and modernization of ships. Volume 5 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy 15,817,464 14,693,978 5,802,107 20,496,085 Grand Total Department of War 15,817,464 14,693,978 5,802,107 20,496,085 UNCLASSIFIED Volume 5 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 Total Department of the Navy 18,866,679 50,000 18,916,679 Grand Total Department of War 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 5 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy UNCLASSIFIED Volume 5 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 5 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ships support equipment 6,488,639 5,839,954 3,510,954 9,350,908 02. Communications and electronics equipment 4,075,820 4,467,421 143,000 4,610,421 03. Aviation support equipment 883,449 843,043 80,000 923,043 04. Ordnance support equipment 1,432,684 1,660,570 17,380 1,677,950 260,583 350,308 200 350,508 1,049,044 672,821 40,800 713,621 05. Civil engineering support equipment 06. Supply support equipment 07. Personnel and command support equipment 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 15,817,464 14,693,978 5,802,107 20,496,085 08. Spares and repair parts Total Other Procurement, Navy UNCLASSIFIED Volume 5 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ships support equipment 7,696,789 02. Communications and electronics equipment 50,000 7,746,789 5,446,166 5,446,166 03. Aviation support equipment 899,479 899,479 04. Ordnance support equipment 2,210,273 2,210,273 05. Civil engineering support equipment 353,489 353,489 06. Supply support equipment 396,204 396,204 1,098,568 1,098,568 765,711 765,711 07. Personnel and command support equipment 08. Spares and repair parts Total Other Procurement, Navy 18,866,679 UNCLASSIFIED 50,000 18,916,679 Volume 5 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 20,840 9,978 9,978 A U 77,592 62,004 62,004 A U 97,206 96,945 96,945 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 275,575 204,863 204,863 5 DDG Mod A U 822,065 878,787 878,787 6 Firefighting Equipment A U 38,521 36,488 36,488 UNCLASSIFIED Volume 5 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 22,668 22,668 A U 103,871 103,871 A U 83,510 83,510 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 344,885 344,885 5 DDG Mod A U 1,000,278 1,000,278 6 Firefighting Equipment A U 177,708 177,708 UNCLASSIFIED Volume 5 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 7 Command and Control Switchboard A U 2,402 2,417 8 LHA/LHD Midlife A U 76,601 60,617 9 LCC 19/20 Extended Service Life Program A U 7,352 19,276 19,276 10 Pollution Control Equipment B U 23,440 22,477 22,477 11 Submarine Support Equipment A U 278,766 383,062 383,062 12 Virginia Class Support Equipment A U 43,565 52,039 52,039 13 LCS Class Support Equipment U 5,855 2,551 2,551 14 Submarine Batteries U 30,470 28,169 28,169 15 LPD Class Support Equipment U 45,738 96,542 16 DDG 1000 Class Support Equipment A U 325,668 115,267 115,267 17 Strategic Platform Support Equip A U 53,931 38,039 38,039 UNCLASSIFIED 2,417 65,400 29,000 126,017 125,542 Volume 5 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7 Command and Control Switchboard A U 2,259 2,259 8 LHA/LHD Midlife A U 131,315 131,315 9 LCC 19/20 Extended Service Life Program A U 766 766 10 Pollution Control Equipment B U 22,506 22,506 11 Submarine Support Equipment A U 330,951 330,951 12 Virginia Class Support Equipment A U 83,297 83,297 13 LCS Class Support Equipment U 15,815 15,815 14 Submarine Batteries U 26,211 26,211 15 LPD Class Support Equipment U 213,723 213,723 16 DDG 1000 Class Support Equipment A U 58,284 58,284 17 Strategic Platform Support Equip A U 72,163 72,163 UNCLASSIFIED Volume 5 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2025 Actuals Sec U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 4,586 Cost Qty Qty 5,849 U A Cost FY 2026 Total Cost 5,849 694,020 694,020 20,321 20,321 U 11,013 U 16,650 22,355 A U 66,346 12,691 A U 3,254 2,607 2,607 22,355 7,400 20,091 Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,573,098 2,392,620 2,392,620 25 Reactor Components A U 445,974 474,806 474,806 A U 14,000 7,842 7,842 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 5 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 7,440 7,440 U 585 585 U 22,515 22,515 U 20,575 20,575 A U 69,425 69,425 A U 2,425 2,425 A Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,737,140 2,737,140 25 Reactor Components A U 519,821 519,821 A U 33,013 33,013 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 5 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 28 Standard Boats A U 447,298 A U 1,950,714 1,950,714 82,086 5,100 87,186 209,304 394,998 390,600 785,598 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 56,103 38,880 38,880 31 LCS MCM Mission Modules U 118,247 91,372 91,372 32 LCS SUW Mission Modules U 11,101 3,790 3,790 33 LCS In-Service Modernization A U 188,254 189,458 189,458 34 Small & Medium UUV A U 48,780 7,000 UNCLASSIFIED 345,086 352,086 Volume 5 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 121,130 28 Standard Boats A U 97,746 97,746 A U 492,100 492,100 50,000 171,130 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 30,565 30,565 31 LCS MCM Mission Modules U 65,113 65,113 32 LCS SUW Mission Modules U 1,719 1,719 33 LCS In-Service Modernization A U 315,272 315,272 34 Small & Medium UUV A U 110,955 110,955 UNCLASSIFIED Volume 5 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 35 Large UUV A U 36 Extra Large UUV A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty 3,313 Cost 3,313 Logistic Support 37 LSD Midlife & Modernization U Total Ships support equipment 49,044 4,079 6,488,639 5,839,954 4,079 3,510,954 9,350,908 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 7,402 39 AN/SQQ-89 Surf ASW Combat System A U 134,635 144,425 144,425 40 SSN Acoustic Equipment A U 458,824 498,597 498,597 41 Undersea Warfare Support Equipment A U 14,247 UNCLASSIFIED Volume 5 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 35 Large UUV A U 222,998 222,998 36 Extra Large UUV A U 135,802 135,802 U 240 240 Logistic Support 37 LSD Midlife & Modernization Total Ships support equipment 7,696,789 50,000 7,746,789 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 39 AN/SQQ-89 Surf ASW Combat System A U 142,355 142,355 40 SSN Acoustic Equipment A U 454,161 454,161 41 Undersea Warfare Support Equipment A U UNCLASSIFIED Volume 5 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 51,514 56,482 56,482 43 SSTD A U 9,647 14,915 14,915 44 Fixed Surveillance System A U 405,854 352,312 45 SURTASS A U 45,975 31,169 31,169 A U 190,011 422,704 422,704 A U 361,915 379,908 379,908 U 4,680 13,008 13,008 143,000 495,312 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 5 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 68,881 68,881 43 SSTD A U 14,857 14,857 44 Fixed Surveillance System A U 490,548 490,548 45 SURTASS A U 72,190 72,190 A U 653,483 653,483 A U 701,667 701,667 U 8,652 8,652 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 5 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 49 Cooperative Engagement Capability B U 26,644 26,648 26,648 50 Naval Tactical Command Support System (NTCSS) A U 13,614 7,972 7,972 51 ATDLS A U 68,458 58,739 58,739 52 Navy Command and Control System (NCCS) U 3,645 3,489 3,489 53 Minesweeping System Replacement A U 16,808 16,426 16,426 54 Navstar GPS Receivers (SPACE) A U 37,964 45,701 45,701 55 American Forces Radio and TV Service A U 3,802 304 304 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 90,586 97,262 97,262 57 Afloat ATC Equipment A U 74,458 72,104 72,104 58 ID Systems A U 59,602 52,171 52,171 UNCLASSIFIED Volume 5 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 49 Cooperative Engagement Capability B U 33,932 33,932 50 Naval Tactical Command Support System (NTCSS) A U 10,108 10,108 51 ATDLS A U 52,758 52,758 52 Navy Command and Control System (NCCS) U 16,167 16,167 53 Minesweeping System Replacement A U 14,879 14,879 54 Navstar GPS Receivers (SPACE) A U 43,097 43,097 55 American Forces Radio and TV Service A U 289 289 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 83,057 83,057 57 Afloat ATC Equipment A U 62,581 62,581 58 ID Systems A U 35,620 35,620 UNCLASSIFIED Volume 5 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost U 7,287 5,105 5,105 U 42,326 60,058 60,058 U 8,479 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 66,470 64,901 64,901 63 Intelligence Surveillance and Reconnaissance (ISR) A U 16,946 12,112 12,112 64 CANES U 439,977 534,324 534,324 65 RADIAC U 38,688 31,289 31,289 66 CANES-Intell U 50,654 46,281 46,281 67 GPETE U 32,005 33,395 33,395 68 MASF U 24,361 13,205 13,205 A A UNCLASSIFIED Volume 5 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 2,976 2,976 U 54,487 54,487 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 48,262 48,262 63 Intelligence Surveillance and Reconnaissance (ISR) A U 11,824 11,824 64 CANES U 493,046 493,046 65 RADIAC U 38,000 38,000 66 CANES-Intell U 43,028 43,028 67 GPETE U 31,462 31,462 68 MASF U 5,822 5,822 U A A UNCLASSIFIED Volume 5 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 69 Integ Combat System Test Facility A U 6,709 11,493 11,493 70 EMI Control Instrumentation A U 4,081 3,687 3,687 71 In-Service Radars and Sensors A U 262,890 249,656 249,656 Shipboard Communications 72 Battle Force Tactical Network A U 104,019 106,583 106,583 73 Shipboard Tactical Communications A U 24,602 20,900 20,900 74 Ship Communications Automation A U 127,321 162,075 162,075 75 Communications Items Under $5M A U 9,209 11,138 11,138 Submarine Communications 76 Submarine Broadcast Support A U 129,467 113,115 113,115 77 Submarine Communication Equipment A U 68,334 84,584 84,584 UNCLASSIFIED Volume 5 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 69 Integ Combat System Test Facility A U 6,454 6,454 70 EMI Control Instrumentation A U 3,435 3,435 71 In-Service Radars and Sensors A U 338,946 338,946 Shipboard Communications 72 Battle Force Tactical Network A U 125,661 125,661 73 Shipboard Tactical Communications A U 50,350 50,350 74 Ship Communications Automation A U 156,605 156,605 75 Communications Items Under $5M A U 15,097 15,097 Submarine Communications 76 Submarine Broadcast Support A U 173,069 173,069 77 Submarine Communication Equipment A U 88,071 88,071 UNCLASSIFIED Volume 5 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 59,732 62,943 62,943 U 162,928 63,433 63,433 220,453 220,453 A U A U 4,551 3,389 3,389 Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 195,063 191,239 191,239 83 MIO Intel Exploitation Team A U 1,100 1,122 1,122 Cryptologic Equipment UNCLASSIFIED Volume 5 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 57,961 57,961 U 57,768 57,768 A U 202,305 202,305 A U Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 349,099 349,099 83 MIO Intel Exploitation Team A U 1,063 1,063 Cryptologic Equipment UNCLASSIFIED Volume 5 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty A U 15,506 Cost Qty Cost FY 2026 Total Qty Cost 7,841 7,841 58,764 58,764 Other Electronic Support 85 DON TRR-1 (Afloat) A U 10,370 86 DON UAS Video 5 (Afloat) A U 5,370 87 USN Ashore/Shipboard CONOPS Verification and A U 6,586 88 USN Training Ranges - Codify CONOPS/TTPs A U 1,375 89 USN Training Ranges - Spectrum Sensing A U 1,000 90 USN EME Sensing and Monitoring A U 120 91 Coast Guard Equipment A U 49,523 A U 18,486 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 5 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2027 Discretionary Request Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7,419 7,419 Other Electronic Support 85 DON TRR-1 (Afloat) A U 86 DON UAS Video 5 (Afloat) A U 87 USN Ashore/Shipboard CONOPS Verification and A U 88 USN Training Ranges - Codify CONOPS/TTPs A U 89 USN Training Ranges - Spectrum Sensing A U 90 USN EME Sensing and Monitoring A U 91 Coast Guard Equipment A U 67,106 67,106 A U 57,568 57,568 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 5 - xxxvi === page 39 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Total Communications and electronics equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 4,075,820 4,467,421 143,000 4,610,421 80,000 369,908 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 353,441 289,908 Aircraft Support Equipment 94 Minotaur A U 5,431 5,191 5,191 95 Weapons Range Support Equipment A U 138,062 123,435 123,435 96 Aircraft Support Equipment A U 121,727 82,039 82,039 97 Advanced Arresting Gear (AAG) A U 2,244 4,484 4,484 98 Electromagnetic Aircraft Launch System (EMALS A U 14,702 16,294 16,294 99 Meteorological Equipment A U 17,982 13,806 13,806 UNCLASSIFIED Volume 5 - xxxvii === page 40 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Total Communications and electronics equipment Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 5,446,166 5,446,166 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 300,151 300,151 Aircraft Support Equipment 94 Minotaur A U 4,831 4,831 95 Weapons Range Support Equipment A U 119,900 119,900 96 Aircraft Support Equipment A U 69,065 69,065 97 Advanced Arresting Gear (AAG) A U 23,551 23,551 98 Electromagnetic Aircraft Launch System (EMALS A U 36,908 36,908 99 Meteorological Equipment A U 7,477 7,477 UNCLASSIFIED Volume 5 - xxxviii === page 41 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 100 Airborne MCM A U 10,643 9,643 9,643 101 Aviation Support Equipment A U 99,656 111,334 111,334 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 119,561 186,909 186,909 883,449 843,043 Total Aviation support equipment 80,000 923,043 Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,712 7,358 7,358 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 226 209 209 105 Ship Missile Support Equipment A U 431,830 527,292 527,292 106 Tomahawk Support Equipment A U 98,921 107,709 107,709 FBM Support Equipment UNCLASSIFIED Volume 5 - xxxix === page 42 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 100 Airborne MCM A U 9,507 9,507 101 Aviation Support Equipment A U 116,873 116,873 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 211,216 211,216 899,479 899,479 Total Aviation support equipment Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,962 6,962 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 195 195 105 Ship Missile Support Equipment A U 431,069 431,069 106 Tomahawk Support Equipment A U 116,208 116,208 FBM Support Equipment UNCLASSIFIED Volume 5 - xl === page 43 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty 107 CPS Support Equipment A U 108 Strategic Missile Systems Equip A U 320,691 491,179 Cost FY 2026 Total Qty 67,264 Cost 67,264 9,180 500,359 ASW Support Equipment 109 SSN Combat Control Systems A U 153,237 102,954 102,954 110 ASW Support Equipment A U 25,362 25,721 25,721 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 52,885 17,758 17,758 112 Directed Energy Systems A U 3,817 2,976 2,976 113 Items Less Than $5 Million A U 3,193 3,635 3,635 A U 75,614 50,741 50,741 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 5 - xli === page 44 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 107 CPS Support Equipment A U 188,430 188,430 108 Strategic Missile Systems Equip A U 327,941 327,941 ASW Support Equipment 109 SSN Combat Control Systems A U 165,416 165,416 110 ASW Support Equipment A U 25,105 25,105 48,252 48,252 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 112 Directed Energy Systems A U 113 Items Less Than $5 Million A U 2,592 2,592 A U 606,241 606,241 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 5 - xlii === page 45 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 80,236 Cost Qty Cost FY 2026 Total Qty 77,889 Cost 77,889 179,960 177,885 8,200 186,085 1,432,684 1,660,570 17,380 1,677,950 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,751 3,825 3,825 118 General Purpose Trucks A U 5,795 5,489 5,489 119 Trailers A U 120 Construction & Maintenance Equip A U 76,983 105,592 105,592 121 Fire Fighting Equipment A U 23,006 27,675 27,675 122 Tactical Vehicles B U 36,355 37,262 37,262 123 Amphibious Equipment A U 6,454 38,073 38,073 200 UNCLASSIFIED 200 Volume 5 - xliii === page 46 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2027 Mandatory Request Qty 73,681 Cost FY 2027 Total Qty Cost 73,681 218,181 218,181 2,210,273 2,210,273 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,567 3,567 118 General Purpose Trucks A U 4,801 4,801 119 Trailers A U 120 Construction & Maintenance Equip A U 91,269 91,269 121 Fire Fighting Equipment A U 17,107 17,107 122 Tactical Vehicles B U 46,796 46,796 123 Amphibious Equipment A U 53,916 53,916 UNCLASSIFIED Volume 5 - xliv === page 47 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 124 Pollution Control Equipment A U 3,924 4,009 4,009 125 Items less than $5 Million A U 103,014 127,086 127,086 126 Physical Security Vehicles A U 1,301 1,297 1,297 260,583 350,308 Total Civil engineering support equipment 200 350,508 40,800 40,800 Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 56,585 128 First Destination Transportation A U 6,463 6,203 129 Special Purpose Supply Systems A U Total Supply support equipment 985,996 666,618 1,049,044 672,821 5,341 3,480 6,203 666,618 40,800 713,621 Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED 3,480 Volume 5 - xlv === page 48 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 124 Pollution Control Equipment A U 3,586 3,586 125 Items less than $5 Million A U 131,449 131,449 126 Physical Security Vehicles A U 998 998 353,489 353,489 Total Civil engineering support equipment Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 67,828 67,828 128 First Destination Transportation A U 4,732 4,732 129 Special Purpose Supply Systems A U 323,644 323,644 396,204 396,204 10,608 10,608 Total Supply support equipment Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED Volume 5 - xlvi === page 49 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost A U 43,126 73,631 73,631 Command Support Equipment 132 Command Support Equipment A U 29,698 34,249 34,249 133 Medical Support Equipment A U 10,122 24,256 24,256 135 Naval MIP Support Equipment A U 6,590 8,810 136 Operating Forces Support Equipment A U 17,941 16,567 16,567 137 C4ISR Equipment A U 33,606 36,945 36,945 138 Environmental Support Equipment A U 47,499 42,860 42,860 139 Physical Security Equipment A U 138,799 166,577 166,577 140 Enterprise Information Technology A U 42,026 42,363 42,363 UNCLASSIFIED 21,946 30,756 Volume 5 - xlvii === page 50 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost A U 331,016 331,016 Command Support Equipment 132 Command Support Equipment A U 55,202 55,202 133 Medical Support Equipment A U 54,862 54,862 135 Naval MIP Support Equipment A U 5,213 5,213 136 Operating Forces Support Equipment A U 15,107 15,107 137 C4ISR Equipment A U 33,975 33,975 138 Environmental Support Equipment A U 60,467 60,467 139 Physical Security Equipment A U 218,037 218,037 140 Enterprise Information Technology A U 40,490 40,490 UNCLASSIFIED Volume 5 - xlviii === page 51 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Other 141 Cancelled Account Adjustments A U 46 142 Next Generation Enterprise Service A U 226,479 185,755 185,755 143 Cyberspace Activities A U 2,195 2,239 2,239 Classified Programs 999 Classified Programs U 16,134 62,991 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 Total Spares and repair parts 1,007,643 159,138 1,987,827 2,146,965 Total Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Personnel and command support equipment 62,991 Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED Volume 5 - xlix === page 52 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Other 141 Cancelled Account Adjustments A U 142 Next Generation Enterprise Service A U 223,647 223,647 143 Cyberspace Activities A U 7,131 7,131 Classified Programs 999 Classified Programs U 42,813 42,813 1,098,568 1,098,568 765,711 765,711 Total Spares and repair parts 765,711 765,711 Total Other Procurement, Navy 18,866,679 Total Personnel and command support equipment Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED 50,000 18,916,679 Volume 5 - l === page 53 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 5 - li === page 54 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 5 - lii === page 55 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 UNCLASSIFIED Volume 5 - liii === page 56 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 UNCLASSIFIED Volume 5 - liv === page 57 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 UNCLASSIFIED Volume 5 - lv === page 58 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 5 - lvi === page 59 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 5 - lvii === page 60 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 127 06 01 7025 Supply Equipment.............................................................................................................................. Volume 5 - 121 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 UNCLASSIFIED Volume 5 - lviii === page 61 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 129 06 01 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 7069 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 143 07 05 8645 Cyberspace Activities.........................................................................................................................Volume 5 - 315 UNCLASSIFIED Volume 5 - lix === page 62 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 5 - lx === page 63 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 UNCLASSIFIED Volume 5 - lxi === page 64 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 EOD Equipment 5509 111 04 06................... Volume 4 - 141 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 UNCLASSIFIED Volume 5 - lxii === page 65 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 ID Systems 2851 58 02 09................... Volume 2 - 471 In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 UNCLASSIFIED Volume 5 - lxiii === page 66 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Minotaur 3640 94 03 03..................... Volume 3 - 31 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 UNCLASSIFIED Volume 5 - lxiv === page 67 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 RADIAC 2920 65 02 10................... Volume 2 - 579 Reactor Components 1020 25 01 10................... Volume 1 - 491 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 SURTASS 2237 45 02 03................... Volume 2 - 143 UNCLASSIFIED Volume 5 - lxv === page 68 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 UNCLASSIFIED Volume 5 - lxvi === page 69 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 5 - lxvii === page 70 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - lxviii === page 71 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 127 06 01 Supply Equipment.............................................................................................................................. Volume 5 - 121 7025 Page UNCLASSIFIED Volume 5 - lxix === page 72 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 129 06 01 7069 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 UNCLASSIFIED Volume 5 - lxx === page 73 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 143 07 05 Cyberspace Activities.........................................................................................................................Volume 5 - 315 8645 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 5 - lxxi === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - lxxii === page 75 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 UNCLASSIFIED Volume 5 - lxxiii === page 76 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UNCLASSIFIED Volume 5 - lxxiv === page 77 === Executive Summary for Other Procurement, Navy Table 1: FundingOverview Discretionary Mandatory Total BLI 0933 0946 0954 0954 0956 0970 0970 0981 1210 1445 1445 1611 1613 2225 3050 3415 4048 5358 5664 6007 7025 8114 9020 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 15,817,464 14,693,978 18,866,679 31,650 5,802,107 50,000 15,849,114 20,496,085 18,916,679 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title Readiness Readiness Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Readiness Readiness INDOPACOM Capabilities INDOPACOM Capabilities Readiness Shipbuilding Shipbuilding INDOPACOM Capabilities Low-Cost Weapons Low-Cost Weapons Munitions and Supply Chain Nuclear Readiness INDOPACOM Capabilities Shipbuilding INDOPACOM Capabilities Readiness FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 23,775 $ 7,875 $ $ $ $ $ $ $ $ 31,650 FY 2026 ($K) $ 65,400 $ 29,000 $ 1,950,714 $ $ 694,020 $ 20,148 $ 173 $ 7,400 $ 5,100 $ 117,600 $ 273,000 $ 345,086 $ 3,313 $ 143,000 $ $ $ 80,000 $ 9,180 $ 8,200 $ 200 $ 40,800 $ 21,946 $ 1,987,827 $ 5,802,107 FY 2027 ($K) $ $ $ $ 50,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 50,000 Volume 5 - lxxv === page 78 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Other Procurement, Navy includes $18,866,679 thousand of discretionary and $50,000 thousand of mandatory for a total of $18,916,679 thousand. The mandatory funds support: Medium Uncrewed Surface Vessels (MUSV): The Navy’s FY 2027 mandatory budget request includes $50 million for the procurement of one vessel. The FY 2026 spend plan for Other Procurement, Navy includes $14,693,978 thousand of discretionary and $5,802,107 thousand of mandatory for a total of $20,496,085 thousand. The FY 2025 spend plan for Other Procurement, Navy includes $15,817,464 thousand of discretionary and $31,650 thousand of mandatory for a total of $15,849,114 thousand. Volume 5 - lxxvi === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6003 / Passenger Carrying Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 18.134 3.751 3.825 3.567 0.000 3.567 3.825 3.883 3.957 - - - - - - - - - 18.134 3.751 3.825 3.567 0.000 3.567 3.825 3.883 3.957 - - - - - - - - - 18.134 3.751 3.825 3.567 0.000 3.567 3.825 3.883 3.957 To FY 2031 Complete 4.034 Continuing - Continuing - 4.034 Continuing - Total - Continuing - - 4.034 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item funds procurement of passenger-carrying vehicles consisting of buses, automobiles, ambulances, and sport utility vehicles (SUVs), and carryall passenger vans up to 9200 lbs. Gross Vehicle Weight Rating (GVWR). These vehicles are utilized by Naval Operating Forces and Shore Activities for essential transportation of personnel in the execution of official Navy business. Buses procured range from 20 to 66 passenger school buses, shuttle buses, intercity buses, and ambulance buses, which provide the most cost-effective means to transport large groups of personnel between various locations. Buses are used to transport sailors/airmen and reserve personnel for flight/ship logistic related assignments, mandatory military training and exercises, and for transportation of personnel between administrative areas, ships/airfields, and industrial areas on a daily basis (both scheduled and intermittent). Automobiles are used to transport small groups of personnel, on and off base, for various work-related activities. Law enforcement automobiles provide essential transportation services to insure optimum responsiveness in support of DoW intelligence and base security missions. They are used in Naval intelligence, investigative and surveillance operations, security patrols, and other law enforcement activities. Ambulances are used by the Medical Corps at Navy hospitals, clinics, and by Naval Expeditionary Medical Command Units. Modular ambulances are used for emergency transport of personnel where emergency medical services are provided in route. Field ambulances provide the same emergency service, with the four-wheel drive capability to access off-road remote sites in support of field units. Patient transports are used for transporting stabilized patients to specialized care/other medical facilities. Ambulance conversion/MEDEVAC buses have the capability to transport a combination of ambulatory and/or stretcher-borne patients. Sport utility vehicles are utilized to transport both personnel and/or small loads of cargo, such as supplies, materials, and equipment. Carryall passenger vans are used for transporting sailors, flight crews, maintenance, and civilian personnel to work sites or for other mission related activities. LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 1 of 7 P-1 Line #117 Volume 5 - 1 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6003 / Passenger Carrying Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Passenger Carrying Vehicles P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 18.134 - / 3.751 - / 3.825 - / 3.567 - / 18.134 - / 3.751 - / 3.825 - / 3.567 - / - - / 3.567 / 0.000 - / 3.567 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Passenger-Carrying Vehicles - PW (BSVE/NTVE): The FY27 funding reflects a decrease of $258K. The funding is required to support the recapitalization of Navy-owned Passenger-Carrying Vehicle assets at locations not serviced by the General Services Administration, where commercial leasing options are unavailable or would exceed 90% of the vehicle purchase price. The current fleet has surpassed its service life, exceeded maintenance cost thresholds, and faced increasing scarcity of repair parts. Naval Special Warfare (NSW) requires dedicated safety response vehicles for all high-risk training events. Many training areas are inaccessible to civilian ambulances, and NSW is responsible for transporting personnel requiring urgent medical care from remote training sites to accessible hard surface roads for ambulance transfer. Additionally, NSW Unit Level Training (ULT) and Squadron Integration Training (SIT) rely on a fleet of Passenger-Carrying Vehicles to move small units, task groups, and squadron sized elements for specialized training, exercises, redeployment certification, and events that refine tactics, techniques, and procedures. NSW manages a large training pipeline, including more than 600 students in Basic Underwater Demolition/SEAL (BUD/S) and Advanced Training Command courses. Personnel must travel between multiple offsite ranges and terrain models to train in diverse operational environments that replicate conditions expected in combat. Reliable Passenger-Carrying Vehicles are essential to safely and efficiently support this training mission. LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 2 of 7 P-1 Line #117 Volume 5 - 2 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6003 / Passenger Carrying Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Passenger Carrying Vehicles Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Cars 1.1) BSVE-0104-RHSEDAN COMPACT 5 PASSENGER 4 DOOR RHD A 1.2) BSVE-0104-02SEDAN COMPACT 5 PASSENGER 4 DOOR (CLASS II) SIN A - - 81,222.22 0.179 9 0.731 - - 25,846.00 - 9 0.233 - - 26,362.00 - 9 0.237 - 26,890.00 - - - - - 10 0.269 - - - - 26,890.00 - - 10 0.269 (†) 9C/H/P Subtotal: 1) Cars - - 0.910 - - 0.233 - - 0.237 - - 0.269 - - - - - 0.269 - - - - - - - - - - - - 50 1.608 41 2.090 - - - 41 2.090 2) Vans 2.1) BSVE-0330-07TRK VAN COMPACT 7 PASSENGER 4X2 UP TO 8500 GVWR A 92,500.00 4 0.370 22,885.00 1 0.023 152,631.58 38 5.800 31,532.00 8 0.252 31,600.00 10 0.316 - - - - - - - - - - - - - - - - - 6.486 - - 0.275 - - 1.608 - - 2.090 - - - - - 2.090 - - 0.688 - - - 32,806.00 19 0.623 - - - - - - - - - 154,777.78 18 2.786 39,101.00 19 0.743 39,883.00 7 0.279 40,680.00 7 0.285 - - - 40,680.00 7 0.285 294,666.67 6 1.768 55,743.00 9 0.502 56,857.00 9 0.512 57,994.00 4 0.232 - - - 57,994.00 4 0.232 92,375.00 8 0.739 47,569.00 4 0.190 - - - - (†) SIN 20/P 2.2) BSVE-0330-05TRK VAN 15 PASSENGER 4X2 8501 GVWR & UP SIN 24 A 32,163.00 50,970.00 50,970.00 (1)(†) 2.3) BSVE-0330-06TRK VAN 15 PASSENGER 4X4 8501 GVWR AND UP SIN 24X A Subtotal: 2) Vans 3) Sport Utility Vehicles 3.1) BSVE-0305-02SUV 4X4 INTERMEDIATE UP TO 8500 GVWR SIN A (†) 105A 3.2) BSVE-0305-03SUV 4X4 STANDARD 8501-9999 GVWR A (†) SIN 105B 3.3) BSVE-0305-03SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 106 (†) 3.4) BSVE-0305-04SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 108 A A - - - - - - - - (†) LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 3 of 7 P-1 Line #117 Volume 5 - 3 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6003 / Passenger Carrying Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.5) BSVE-0305-LESUV 4X4/AWD UP TO 8500 GVWR SIN 100L A 3.6) BSVE-0307-01SUV 4X4 EMERG. RESPONSE UPFIT 8501-9999 GVWR SIN A 3.7) BSVE-0308-01SUV 4X2 COMPACT UP TO 8500 GVWR A MAIS Code Unit Cost ($) Qty (Each) 79,000.00 - FY 2025 Total Cost ($ M) 1 - Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Passenger Carrying Vehicles Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.079 - - - - - - - - - - - - - - - 0.087 - - - - - - - - - - - - - - - 0.076 - - - - - - - - - - - - - - - - - - - 0.257 - - - - - - - - - - - 0.517 - - - - - 0.517 105,666.67 3 0.317 24,776.00 2 0.050 527,000.00 1 0.527 31,836.00 4 0.127 358,000.00 3 1.074 31,518.00 3 0.095 25,271.00 3 (†) SIN 98 3.8) BSVE-0308-02SUV 4X2 INTERMEDIATE 6000-8500 GVWR A - - (†) SIN 100A/B 3.9) BSVE-0308-03SUV 4X2 STANDARD 8501-9999 GVWR A 32,148.00 8 (†) SIN 101 Subtotal: 3) Sport Utility Vehicles - - 8.065 - - 1.707 - - 1.747 - - 0.437 - - - - - - 200,000.00 2 0.400 - - - 200,000.00 2 0.400 - - 0.732 0.081 82,570.00 1 0.083 - - - 82,570.00 1 0.083 - - 1.169 4) Ambulances 4.1) BSVE-0334-03TRK AMB TYPE I-AD CONV CAB-CHASSIS 16000 & UP GVWR SIN211 A (2) 4.2) SIN 212X - AMB Type II (Export) (†) A Subtotal: 4) Ambulances 79,368.00 - 1 0.079 80,955.00 1 - 0.079 - - 0.081 - - 0.483 - - - - - 0.483 0.118 120,729.00 11 1.328 - - - - - - - - - - - - 5) Buses 5.3) BSVE-BUS 36 PASSENGER MANUAL/ AUTOMATIC TRANSMISSION A 118,000.00 1 (†) ADULT SIN 321A Subtotal: 5) Buses - - 0.118 - - 1.328 - - - - - - - - - - - - 6) Integrated Logistics Support (ILS) Costs - - 1.386 - - 0.129 - - 0.152 - - 0.208 - - - - - 0.208 Subtotal: 6) Integrated Logistics Support (ILS) Costs 6.1) ILS Costs A - - 1.386 - - 0.129 - - 0.152 - - 0.208 - - - - - 0.208 Total - - 18.134 - - 3.751 - - 3.825 - - 3.567 - - - - - 3.567 LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 4 of 7 P-1 Line #117 Volume 5 - 4 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 P-1 Line Item Number / Title: 6003 / Passenger Carrying Vehicles Aggregated Items Title: Passenger Carrying Vehicles Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) FY27 - Despite reduction in quantity, total cost increased due to higher unit prices driven by inflation, increase raw material costs, and continued supply chain disruptions. FY27 Quantity increase is due to greater high demand in meeting critical mission requirements. LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 5 of 7 P-1 Line #117 Volume 5 - 5 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Passenger Carrying Vehicles FY Contractor and Location Method/Type or Funding Vehicle 1.2) BSVE-0104-02-SEDAN COMPACT 5 PASSENGER 4 DOOR (CLASS II) SIN 9C/H/P 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Sep 2025 Sep 2026 9 25,846.00 Y 1.2) BSVE-0104-02-SEDAN COMPACT 5 PASSENGER 4 DOOR (CLASS II) SIN 9C/H/P 2026 Fleet Vehicle Source / Corvina, CA Reqn GSA Aug 2026 Aug 2027 9 26,362.00 Y 1.2) BSVE-0104-02-SEDAN COMPACT 5 PASSENGER 4 DOOR (CLASS II) SIN 9C/H/P 2027 Fleet Vehicle Source / Corvina, CA Reqn GSA Oct 2026 Oct 2026 10 26,890.00 Y 2025 FCA US / Auburn Hills, MI Reqn GSA Jul 2025 Jan 2026 1 22,885.00 Y 2025 GM MOTORS / Detroit, MI Reqn GSA Sep 2025 May 2027 8 31,532.00 Y 2026 FORD MOTOR CO / DEARBORN,MI Reqn GSA Aug 2026 Aug 2027 50 32,163.00 Y FORD MOTOR CO / DEARBORN,MI Reqn GSA Oct 2026 Oct 2027 41 50,970.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6003 / Passenger Carrying Vehicles Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Cars 2) Vans 2.1) BSVE-0330-07-TRK VAN COMPACT 7 PASSENGER 4X2 UP TO 8500 GVWR SIN 20/P 2.2) BSVE-0330-05-TRK VAN 15 PASSENGER 4X2 8501 GVWR & UP SIN 24 (1) 2.2) BSVE-0330-05-TRK VAN 15 PASSENGER 4X2 8501 GVWR & UP SIN 24 (1) 2.2) BSVE-0330-05-TRK VAN 15 PASSENGER 4X2 8501 GVWR & UP SIN 24 (1) 2027 (3) 3) Sport Utility Vehicles 3.1) BSVE-0305-02-SUV 4X4 INTERMEDIATE UP TO 8500 GVWR SIN 105A 2026 FCA US LLC / Detroit, MI Reqn GSA Aug 2026 Feb 2027 19 32,806.00 Y 3.2) BSVE-0305-03-SUV 4X4 STANDARD 8501-9999 GVWR SIN 105B 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Sep 2025 Mar 2026 19 39,101.00 Y 3.2) BSVE-0305-03-SUV 4X4 STANDARD 8501-9999 GVWR SIN 105B 2026 Fleet Vehicle Source / Corvina, CA Reqn GSA Aug 2026 Feb 2027 7 39,883.00 Y 3.2) BSVE-0305-03-SUV 4X4 STANDARD 8501-9999 GVWR SIN 105B 2027 Fleet Vehicle Source / Corvina, CA Reqn GSA Oct 2026 Apr 2027 7 40,680.00 Y 3.3) BSVE-0305-03-SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 106 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Sep 2025 Mar 2026 9 55,743.00 Y LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 6 of 7 P-1 Line #117 Volume 5 - 6 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Passenger Carrying Vehicles FY Contractor and Location Method/Type or Funding Vehicle 3.3) BSVE-0305-03-SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 106 2026 Fleet Vehicle Source / Corvina, CA Reqn GSA Aug 2026 Feb 2027 9 56,857.00 Y 3.3) BSVE-0305-03-SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 106 2027 Fleet Vehicle Source / Corvina, CA Reqn GSA Oct 2026 Apr 2027 4 57,994.00 Y 3.4) BSVE-0305-04-SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 108 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Jul 2025 Mar 2026 4 47,569.00 Y 3.7) BSVE-0308-01-SUV 4X2 COMPACT UP TO 8500 GVWR SIN 98 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Jul 2025 Jul 2026 2 24,776.00 Y 3.7) BSVE-0308-01-SUV 4X2 COMPACT UP TO 8500 GVWR SIN 98 2026 Fleet Vehicle Source / Corvina, CA Reqn GSA Aug 2026 Aug 2027 3 25,271.00 Y 3.8) BSVE-0308-02-SUV 4X2 INTERMEDIATE 6000-8500 GVWR SIN 100A/B 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Jun 2025 Dec 2025 4 31,836.00 Y 3.9) BSVE-0308-03-SUV 4X2 STANDARD 8501-9999 GVWR SIN 101 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Jul 2025 Jul 2026 3 31,518.00 Y 3.9) BSVE-0308-03-SUV 4X2 STANDARD 8501-9999 GVWR SIN 101 2026 Fleet Vehicle Source / Corvina, CA Reqn GSA Aug 2026 Aug 2027 8 32,148.00 Y 4.2) SIN 212X - AMB Type II (Export) 2025 Futurebud Intl / Chuo-Ku, Japan C / FPRP FEAD Yokosuka Aug 2025 Aug 2026 1 79,368.00 Y 4.2) SIN 212X - AMB Type II (Export) 2026 Futurebud Intl / Chuo-Ku, Japan C / FPRP FEAD Yokosuka Jun 2026 Jun 2027 1 80,955.00 Y 4.2) SIN 212X - AMB Type II (Export) 2027 Futurebud Intl / Chuo-Ku, Japan C / FPRP FEAD Yokosuka Mar 2027 Mar 2027 1 82,570.00 Y 2025 Fleet Vehicle Source / Corvina, CA Reqn GSA Jun 2025 Dec 2025 11 120,729.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6003 / Passenger Carrying Vehicles Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4) Ambulances 5) Buses 5.3) BSVE-BUS 36 PASSENGER MANUAL/AUTOMATIC TRANSMISSION ADULT SIN 321A Footnotes: (3) Despite quantity and ongoing shortages in critical raw materials, an estimated lead time of 12 months is taken into consideration for the date of first delivery. LI 6003 - Passenger Carrying Vehicles Navy UNCLASSIFIED Page 7 of 7 P-1 Line #117 Volume 5 - 7 === page 86 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 8 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6007 / General Purpose Trucks Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 12.601 5.795 5.489 4.801 0.000 4.801 5.212 5.268 5.347 - - - - - - - - - 12.601 5.795 5.489 4.801 0.000 4.801 5.212 5.268 5.347 - - - - - - - - - 12.601 5.795 5.489 4.801 0.000 4.801 5.212 5.268 5.347 To FY 2031 Complete 5.439 Continuing - Continuing - 5.439 Continuing - Total - Continuing - - 5.439 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: General Purpose Trucks - PW (BSVE/NTVE) - This budget line item funds Naval Operating Forces and Shore Activities with various sizes of Cargo Pickup Trucks, Stake Trucks, Maintenance Utility Vans/Trucks, as well as Panel/Cargo Vans/Trucks of commercial design. General Purpose Trucks (GPT) transport Naval Special Warfare (NSW) SEALs and Special Warfare Combatant-craft Crewmen (SWCC); combat enablers and Combat Service Support (CSS) personnel; and equipment for small unit training. NSW training is conducted in a number of operating environments that include desert, mountain, and beach type terrains where GPT's are well suited to maneuver. GPTs provide an efficient way to transport 4 - 5 personnel, tow cargo trailers and carry training equipment and are heavily relied on as many training areas are outside of the immediate area of NSW's key home stations in San Diego, CA, Little Creek, VA and Stennis, MS. Vehicles are provided across dozens of operational commands, training commands and staff headquarters, and are vital to effectively transporting SEALs/SWCCs and their support elements. Shore Activities use Cargo Pickup Trucks to transport personnel and required equipment in support of fleet operations where such mobility is necessary to support the mission. The Maintenance Utility Vans/ Trucks are used to transport tools/materials necessary for maintenance personnel performing facility maintenance. Panel Vans and Multi-Stop Trucks are used primarily for the movement of material/equipment requiring protection in an enclosed van-type body. Stake Trucks are used to move palletized material/equipment from warehouses to job sites/users at various locations. LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 1 of 11 P-1 Line #118 Volume 5 - 9 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6007 / General Purpose Trucks Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a General Purpose Trucks P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 12.601 - / 5.796 - / 5.490 - / 4.801 - / 12.601 - / 5.795 - / 5.489 - / 4.801 - / - - / 4.801 / 0.000 - / 4.801 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 reflects a reduction of $688K from the funding level required to fully support identified replacement needs. General Purpose Trucks are mission critical BSVE assets that enable daily operations across Navy public works installations and bases. Continued FY27 investment is essential to recapitalize an aging fleet that has exceeded service life, surpassed maintenance cost thresholds, and now faces significant parts scarcity. These vehicles cannot be replaced through the General Services Administration, and commercial leasing is either unavailable or would cost more than 90 percent of the purchase cost. As a result, recapitalization remains the only viable path to sustaining operational readiness and meeting critical mission requirements. General Purpose Trucks directly support Maritime Special Operations Training across twenty one Naval Special Warfare operational commands, eight staff headquarters, and NSW "A" and "C" schools, including Basic Underwater Demolition and advanced skills courses, and they are the primary vehicles used to transport small arms, dive gear, parachutes, special operations equipment, and personnel to weapons ranges, free fall sites, combat diving locations, unmanned systems training areas, and special boat training venues. Without timely replacement of these aging vehicles, the Navy faces increasing safety risks, degraded training throughput, and reduced ability to prepare SEAL, Special Boat, and Combat Support Teams for high-risk deployments. Continued investment is therefore imperative to sustain mission execution, protect personnel, and maintain the operational reliability required across the naval shore enterprise. LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 2 of 11 P-1 Line #118 Volume 5 - 10 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6007 / General Purpose Trucks Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: General Purpose Trucks Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Utility Trucks 1.1) BSVE-0722-08TRK MAINT UTIL 4X4 UP TO 16000 GVWR REG/EXT CAB - - - 72,200.00 1 0.072 - - - - - - 0.608 33,063.91 5 0.165 33,725.19 4 0.135 34,399.69 0.498 72,593.00 4 0.290 74,045.00 4 0.296 75,526.00 - - - - - - - - 2 0.069 - - - 34,399.69 2 0.069 1 0.076 - - - 75,526.00 1 0.076 (†) 1.2) BSVE-0722-01TRUCK PANEL VAN UTILITY 4X2 6001-8500 GVWR SIN 31 A A (1)(†) 1.3) BSVE-0722-10TRK MAINT. UTIL 8501 GVWR & UP CREW CAB 4X4 SIN A 71,142.86 7 (†) 147/149/B Subtotal: 1) Utility Trucks - - 1.106 - - 0.527 - - 0.431 - - 0.145 - - - - - 0.145 0.335 - - - - - - - - - - - - - - - 10 0.459 46,819.00 10 0.468 47,755.00 8 0.382 - - - 47,755.00 8 0.382 11,673.00 5 0.058 11,906.00 10 0.119 - - - 11,906.00 10 0.119 2) Cargo Trucks 2.4) BSVE-0329-03TRUCK PANEL VAN 4X2 8501 GVWR & UP SIN 34 A 2.5) BSVE-0329-01TRUCK PANEL VAN 4X2 6001-8500 A 41,875.00 8 - - 0.993 45,901.00 - - 0.385 - - - (†) GVWR SIN 32 2.6) BSVE-0329-RH TRUCK PANEL VAN MINI-COMPACT 4X2 RHD (2)(†) 2.7) BSVE-0319-03TRUCK CARGO PICKUP COMPACT 4X2 UP TO 6000 GVWR CREW CAB 22,000.00 5 0.110 - - - - - - 23,814.00 9 0.214 - - - 23,814.00 9 0.214 9,500.00 6 0.057 - - - - - - 10,283.00 8 0.082 - - - 10,283.00 8 0.082 - - - - - - - 14 0.405 0.236 - - - A (4) 2.9) BSVE-0342-01TRK CARGO PU 4X2 8501-16000 GVWR REGULAR CAB SIN 44 A (3) 2.8) BSVE-0319-MJTRUCK PANEL VAN MINI-COMPACT 4X2 RHD A A - - - 53,255.00 2 0.107 0.536 28,380.00 8 0.227 - - - - - (†) 2.10) BSVE-0313-01TRUCK CARGO PICKUP 4X2 6001-8500 GVWR A 178,666.67 LI 6007 - General Purpose Trucks Navy 3 28,947.00 UNCLASSIFIED Page 3 of 11 29,525.00 8 P-1 Line #118 29,525.00 8 0.236 Volume 5 - 11 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6007 / General Purpose Trucks Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] REGULAR CAB SIN 41 ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: General Purpose Trucks Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) 2.11) BSVE-0342-02TRK CARGO PU 4X2 8501-16000 GVWR EXTENDED CAB SIN A - - 0.075 26,869.00 2 0.054 27,406.00 1 0.027 27,954.00 1 0.028 - - - 27,954.00 1 0.028 42,179.00 1 0.042 43,022.00 2 0.086 - - - 43,022.00 2 0.086 - - - - (†) 44C/D/E 2.12) BSVE-0316-01TRUCK CARGO PICKUP 4X4 6001-8500 GVWR REGULAR CAB SIN 46 A 40,500.00 4 0.162 41,352.00 1 0.041 62,888.89 9 0.566 39,183.00 2 0.078 0.363 27,038.00 2 0.054 27,578.00 3 0.083 28,129.00 4 0.113 - - - 28,129.00 4 0.113 0.449 36,081.00 7 0.253 36,802.00 7 0.258 37,538.00 7 0.263 - - - 37,538.00 7 0.263 26,903.00 5 0.135 27,441.00 12 0.329 27,989.00 9 0.252 - - - 27,989.00 9 0.252 - - 53,000.00 10 0.530 54,000.00 8 0.432 - - - 54,000.00 8 0.432 - - - - - - 10 0.184 0.168 - - - (†) 2.13) BSVE-0348-01TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49 A - - - - - - - - (†) 2.14) BSVE-0348-01TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49A A - - (†) 2.15) BSVE-0327-01TRK CARGO PU 4X2 8501 GVWR & UP CREW CAB SIN A 112,250.00 4 (†) 52A 2.16) BSVE-0316-03TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55 A - - 0.678 - - 0.118 20 2.374 50,560.00 14 0.708 - 0.404 17,992.00 10 0.180 (†) 2.17) BSVE-0316-03TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN A - (†) 55E 2.18) BSVE-0355-01TRK CARGO PU 4X4 8501-16000 GVWR CREW CAB SIN A 118,700.00 - - - - - - (†) 57A 2.19) BSVE-0319-01TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR REG CAB SIN 60 A - 18,351.00 18,718.00 9 18,718.00 9 0.168 (†) LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 4 of 11 P-1 Line #118 Volume 5 - 12 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6007 / General Purpose Trucks Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.20) BSVE-0319-02TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR A EXTD CAB SIN 61C MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) - - 0.400 23,338.00 - - 0.165 - - - 74,650.00 FY 2026 Total Cost Qty (Each) Aggregated Items Title: General Purpose Trucks Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 10 0.233 23,804.00 10 0.238 24,280.00 10 0.243 - - - 24,280.00 10 0.243 - - 26,496.00 5 0.132 27,025.00 7 0.189 - - - 27,025.00 7 0.189 2 0.149 77,156.00 4 0.309 78,699.00 4 0.315 - - - 78,699.00 4 0.315 (†) 2.21) BSVE-0319-02TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61E A 2.22) BSVE-0343-05TRUCK STAKE 4X4 8501-16000 GVWR REGULAR CAB SIN A - (5)(†) (†) 128/129B 2.23) BSVE-0343-04TRK STAKE 4X2 8501-16000 GVWR REG CAB DUALLY SIN 124/B/D A 74,000.00 3 0.222 75,643.00 3 0.227 67,833.33 6 0.407 69,147.00 7 0.484 56,666.67 3 0.170 41,000.00 3 0.123 - - - - - - - - - - - - 0.212 - - - - - - - - - (†) 2.24) BSVE-0343-07TRK STAKE 4X4 8501-16000 GVWR CREW CAB SIN 128E/129E/F A 70,529.00 3 (†) 2.25) BSVE-0355-03TRK CARGO PU 4X4 8501-16000 GVWR CREW CAB DUALLY SIN 59A/B A 2.26) BSVE-0321-03TRK CARGO PU COMPT 4X4 UP TO 6000 GVWR CREW A - - - - - - - - - - - - - - - 0.083 - - - - - - - - - - - - - 3.472 - - 3.275 - - 3.122 - - - - - 3.122 41,684.00 2 (†) CAB SIN 67E/R Subtotal: 2) Cargo Trucks - - 9.092 - - - 0.413 45,565.00 10 0.456 46,476.00 10 0.465 47,405.00 8 0.379 - - - 47,405.00 8 0.379 - - 0.656 50,379.00 9 0.453 51,386.00 9 0.462 52,413.00 9 0.472 - - - 52,413.00 9 0.472 3) Box Trucks & Large Cargo Vans 3.1) BSVE-0345-01TRUCK MULTISTOP STEP VAN 8501-16000 GVWR SIN 134 A (6)(†) 3.2) BSVE - Cargo Van, 12-18 ft, 19,501-21,999 lbs GVWR SIN 471 A (†) LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 5 of 11 P-1 Line #118 Volume 5 - 13 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6007 / General Purpose Trucks Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Subtotal: 3) Box Trucks & Large Cargo Vans ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: General Purpose Trucks FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 1.069 - - 0.909 - - 0.927 - - 0.851 - - - - - 0.851 4) Integrated Logistics Support (ILS) Costs - - 1.334 - - 0.888 - - 0.857 - - 0.683 - - - - - 0.683 Subtotal: 4) Integrated Logistics Support (ILS) Costs 4.1) ILS Costs A - - 1.334 - - 0.888 - - 0.857 - - 0.683 - - - - - 0.683 Total - - 12.601 - - 5.796 - - 5.490 - - 4.801 - - - - - 4.801 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) Unit cost increase due to standard inflation. Increase in quantity in FY27 due to greater high demand in meeting critical mission requirements FY27 Quantity increase is due to greater high demand in meeting critical mission requirements. FY27 Quantity increase is due to greater high demand in meeting critical mission requirements. FY27 Quantity increase is due to greater high demand in meeting critical mission requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and driven by changes in mission. LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 6 of 11 P-1 Line #118 Volume 5 - 14 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: General Purpose Trucks FY Contractor and Location Method/Type or Funding Vehicle 2025 Ford Motor Co / Dearborn, MI Reqn GSA Jul 2025 Apr 2026 1 72,200.00 Y 2025 FCA US LLC / Detroit, MI Reqn GSA Sep 2025 Mar 2026 5 33,063.91 Y 2026 Ford / Detroit, MI Reqn GSA Jun 2026 Jun 2027 4 33,725.19 Y 2027 Ford / Detroit, MI Reqn GSA Oct 2026 Oct 2026 2 34,399.69 Y 1.3) BSVE-0722-10-TRK MAINT. UTIL 8501 GVWR & UP CREW CAB 4X4 SIN 147/149/B 2025 Ford Motor Co / Dearborn, MI MIPR GSA Sep 2025 Sep 2026 4 72,593.00 Y 1.3) BSVE-0722-10-TRK MAINT. UTIL 8501 GVWR & UP CREW CAB 4X4 SIN 147/149/B 2026 Ford Motor Co / Dearborn, MI MIPR GSA Mar 2026 Mar 2027 4 74,045.00 Y 1.3) BSVE-0722-10-TRK MAINT. UTIL 8501 GVWR & UP CREW CAB 4X4 SIN 147/149/B 2027 Ford Motor Co / Dearborn, MI MIPR GSA Oct 2026 Oct 2026 1 75,526.00 Y 2.5) BSVE-0329-01-TRUCK PANEL VAN 4X2 6001-8500 GVWR SIN 32 2025 General Motors / Detroit, MI Reqn GSA Sep 2025 May 2026 10 45,901.00 Y 2.5) BSVE-0329-01-TRUCK PANEL VAN 4X2 6001-8500 GVWR SIN 32 2026 Ford Motor Company / Dearborn, MI Reqn GSA Jun 2026 Mar 2027 10 46,819.00 Y 2.5) BSVE-0329-01-TRUCK PANEL VAN 4X2 6001-8500 GVWR SIN 32 2027 Ford Motor Company / Dearborn, MI Reqn GSA Oct 2026 Oct 2026 8 47,755.00 Y 2026 FORD MOTOR CO / DEARBORN,MI MIPR GSA Jun 2026 Jun 2027 5 11,673.00 Y 2027 FORD MOTOR CO / DEARBORN,MI MIPR GSA Oct 2026 Oct 2026 10 11,906.00 N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6007 / General Purpose Trucks Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Utility Trucks 1.1) BSVE-0722-08-TRK MAINT UTIL 4X4 UP TO 16000 GVWR REG/EXT CAB 1.2) BSVE-0722-01-TRUCK PANEL VAN UTILITY 4X2 6001-8500 GVWR SIN 31 (1) 1.2) BSVE-0722-01-TRUCK PANEL VAN UTILITY 4X2 6001-8500 GVWR SIN 31 (1) 1.2) BSVE-0722-01-TRUCK PANEL VAN UTILITY 4X2 6001-8500 GVWR SIN 31 (1) 2) Cargo Trucks 2.6) BSVE-0329-RH -TRUCK PANEL VAN MINI-COMPACT 4X2 RHD (2) 2.6) BSVE-0329-RH -TRUCK PANEL VAN MINI-COMPACT 4X2 RHD (2) LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 7 of 11 P-1 Line #118 Volume 5 - 15 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: General Purpose Trucks FY Contractor and Location Method/Type or Funding Vehicle 2.9) BSVE-0342-01-TRK CARGO PU 4X2 8501-16000 GVWR REGULAR CAB SIN 44 2025 Ford Motor Co / Dearborn, MI MIPR GSA Jul 2025 Jan 2026 2 53,255.00 Y 2.10) BSVE-0313-01-TRUCK CARGO PICKUP 4X2 6001-8500 GVWR REGULAR CAB SIN 41 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Sep 2025 Mar 2026 8 28,380.00 Y 2.10) BSVE-0313-01-TRUCK CARGO PICKUP 4X2 6001-8500 GVWR REGULAR CAB SIN 41 2026 GM GOV'T SALES / DETROIT, MI Reqn GSA Aug 2026 May 2027 14 28,947.00 Y 2.10) BSVE-0313-01-TRUCK CARGO PICKUP 4X2 6001-8500 GVWR REGULAR CAB SIN 41 2027 GM GOV'T SALES / DETROIT, MI Reqn GSA Oct 2026 Oct 2026 8 29,525.00 Y 2.11) BSVE-0342-02-TRK CARGO PU 4X2 8501-16000 GVWR EXTENDED CAB SIN 44C/D/E 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Sep 2025 Mar 2026 2 26,869.00 Y 2.11) BSVE-0342-02-TRK CARGO PU 4X2 8501-16000 GVWR EXTENDED CAB SIN 44C/D/E 2026 Brasada/Northside Ford / San Antonio, TX Reqn GSA Aug 2026 Feb 2027 1 27,406.00 Y 2.11) BSVE-0342-02-TRK CARGO PU 4X2 8501-16000 GVWR EXTENDED CAB SIN 44C/D/E 2027 Brasada/Northside Ford / San Antonio, TX Reqn GSA Oct 2026 Oct 2026 1 27,954.00 Y 2.12) BSVE-0316-01-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR REGULAR CAB SIN 46 2025 GM Government Sales / Detroit, MI Reqn GSA Sep 2025 Mar 2026 1 41,352.00 Y 2.12) BSVE-0316-01-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR REGULAR CAB SIN 46 2026 GM Government Sales / Detroit, MI Reqn GSA Aug 2026 Feb 2027 1 42,179.00 Y 2.12) BSVE-0316-01-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR REGULAR CAB SIN 46 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2026 2 43,022.00 Y 2.13) BSVE-0348-01-TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Jul 2025 Jan 2026 2 39,183.00 Y 2.14) BSVE-0348-01-TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49A 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Sep 2025 Mar 2026 2 27,038.00 Y 2.14) BSVE-0348-01-TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49A 2026 Nissan Motor Sales Co., LTD / Minato-Ku Reqn GSA Aug 2026 Feb 2027 3 27,578.00 Y 2.14) BSVE-0348-01-TRK CARGO PU 4X4 8501-16000 GVWR REG CAB SIN 49A 2027 Nissan Motor Sales Co., LTD / Minato-Ku Reqn GSA Oct 2026 Oct 2026 4 28,129.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6007 / General Purpose Trucks LI 6007 - General Purpose Trucks Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 11 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #118 RFP Issue Date Volume 5 - 16 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: General Purpose Trucks FY Contractor and Location Method/Type or Funding Vehicle 2.15) BSVE-0327-01-TRK CARGO PU 4X2 8501 GVWR & UP CREW CAB SIN 52A 2025 Ford Motor Co / Dearborn, MI Reqn GSA Aug 2025 May 2026 7 36,081.00 Y 2.15) BSVE-0327-01-TRK CARGO PU 4X2 8501 GVWR & UP CREW CAB SIN 52A 2026 Ford Motor Co / Dearborn, MI Reqn GSA Aug 2026 May 2027 7 36,802.00 Y 2.15) BSVE-0327-01-TRK CARGO PU 4X2 8501 GVWR & UP CREW CAB SIN 52A 2027 Ford Motor Co / Dearborn, MI Reqn GSA Oct 2026 Oct 2026 7 37,538.00 Y 2.16) BSVE-0316-03-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55 2025 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Sep 2025 Mar 2026 5 26,903.00 Y 2.16) BSVE-0316-03-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55 2026 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Aug 2026 Feb 2027 12 27,441.00 Y 2.16) BSVE-0316-03-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55 2027 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Oct 2026 Oct 2026 9 27,989.00 Y 2.17) BSVE-0316-03-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55E 2026 GM GOV'T SALES / DETROIT, MI Reqn GSA Aug 2026 May 2027 10 53,000.00 Y 2.17) BSVE-0316-03-TRUCK CARGO PICKUP 4X4 6001-8500 GVWR CREW CAB SIN 55E 2027 GM GOV'T SALES / DETROIT, MI Reqn GSA Oct 2026 Oct 2026 8 54,000.00 Y 2.18) BSVE-0355-01-TRK CARGO PU 4X4 8501-16000 GVWR CREW CAB SIN 57A 2025 FCA US/AUBURN HILLS, MI / Auburn Hills, MI Reqn GSA Jun 2025 Dec 2025 14 50,560.00 Y 2.19) BSVE-0319-01-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR REG CAB SIN 60 2025 Nissan Motor Sales Co., LTD / Minato-Ku C / FFP FEAD Yokosuka Sep 2025 Jun 2026 10 17,992.00 Y 2.19) BSVE-0319-01-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR REG CAB SIN 60 2026 Nissan Motor Sales Co., LTD / Minato-Ku C / FFP FEAD Yokosuka Aug 2026 May 2027 10 18,351.00 Y 2.19) BSVE-0319-01-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR REG CAB SIN 60 2027 Nissan Motor Sales Co., LTD / Minato-Ku C / FFP FEAD Yokosuka Oct 2026 Oct 2026 9 18,718.00 Y 2.20) BSVE-0319-02-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61C 2025 Ford Motor Co / Dearborn, MI Reqn GSA Sep 2025 Jun 2026 10 23,338.00 Y 2.20) BSVE-0319-02-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61C 2026 Ford Motor Co / Dearborn, MI Reqn GSA Aug 2026 May 2027 10 23,804.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6007 / General Purpose Trucks LI 6007 - General Purpose Trucks Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 9 of 11 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #118 RFP Issue Date Volume 5 - 17 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Location of PCO Date of First Delivery Reqn GSA Oct 2026 Jul 2027 10 24,280.00 Y Brasada/Northside Ford / San Antonio, TX Reqn GSA Aug 2026 Feb 2027 5 26,496.00 Y 2027 Unknown / Unknown C / TBD ** NO PCO ** Oct 2026 Oct 2026 7 27,025.00 Y 2.22) BSVE-0343-05-TRUCK STAKE 4X4 8501-16000 GVWR REGULAR CAB SIN 128/129B 2025 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Sep 2025 May 2026 2 74,650.00 Y 2.22) BSVE-0343-05-TRUCK STAKE 4X4 8501-16000 GVWR REGULAR CAB SIN 128/129B 2026 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Aug 2026 Apr 2027 4 77,156.00 Y 2.22) BSVE-0343-05-TRUCK STAKE 4X4 8501-16000 GVWR REGULAR CAB SIN 128/129B 2027 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Oct 2026 Oct 2026 4 78,699.00 Y 2.23) BSVE-0343-04-TRK STAKE 4X2 8501-16000 GVWR REG CAB DUALLY SIN 124/B/D 2025 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Aug 2025 Aug 2025 3 75,643.00 Y 2.24) BSVE-0343-07-TRK STAKE 4X4 8501-16000 GVWR CREW CAB SIN 128E/129E/F 2025 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Sep 2025 May 2026 7 69,147.00 Y 2.24) BSVE-0343-07-TRK STAKE 4X4 8501-16000 GVWR CREW CAB SIN 128E/129E/F 2026 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Aug 2026 Apr 2027 3 70,529.00 Y 2.26) BSVE-0321-03-TRK CARGO PU COMPT 4X4 UP TO 6000 GVWR CREW CAB SIN 67E/R 2025 FCA US/AUBURN HILLS, MI / Auburn HIlls, MI Reqn GSA Sep 2025 Sep 2025 2 41,684.00 Y 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Sep 2025 Jun 2026 10 45,565.00 Y 2026 Brasada/Northside Ford / San Antonio, TX Reqn GSA Aug 2026 May 2027 10 46,476.00 Y 2027 Brasada/Northside Ford / San Antonio, TX Reqn GSA Oct 2026 Oct 2026 8 47,405.00 Y 2.20) BSVE-0319-02-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61C 2.21) BSVE-0319-02-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61E (5) 2.21) BSVE-0319-02-TRK CARGO PU COMPACT 4X2 UP TO 6000 GVWR EXTD CAB SIN 61E (5) Contractor and Location Method/Type or Funding Vehicle Ford Motor Co / Dearborn, MI 2026 Aggregated Items: General Purpose Trucks Award Date Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6007 / General Purpose Trucks FY 2027 (7) Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 3) Box Trucks & Large Cargo Vans 3.1) BSVE-0345-01-TRUCK MULTISTOP STEP VAN 8501-16000 GVWR SIN 134 3.1) BSVE-0345-01-TRUCK MULTISTOP STEP VAN 8501-16000 GVWR SIN 134 3.1) BSVE-0345-01-TRUCK MULTISTOP STEP VAN 8501-16000 GVWR SIN 134 (6) (6) (6) LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 10 of 11 P-1 Line #118 Volume 5 - 18 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6007 / General Purpose Trucks Method/Type or Funding Vehicle Aggregated Items: General Purpose Trucks Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 3.2) BSVE - Cargo Van, 12-18 ft, 19,501-21,999 lbs GVWR SIN 471 2025 Brasada/Northside Ford / San Antonio, TX Reqn GSA Aug 2025 Feb 2026 9 50,379.00 Y 3.2) BSVE - Cargo Van, 12-18 ft, 19,501-21,999 lbs GVWR SIN 471 2026 Brasada/Northside Ford / San Antonio, TX Reqn GSA Aug 2026 Feb 2027 9 51,386.00 Y 3.2) BSVE - Cargo Van, 12-18 ft, 19,501-21,999 lbs GVWR SIN 471 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2026 9 52,413.00 Y (Each) RFP Issue Date Footnotes: (7) Despite quantity and ongoing shortages in critical raw materials, an estimated lead time of 9 months is taken into consideration for the date of first delivery. LI 6007 - General Purpose Trucks Navy UNCLASSIFIED Page 11 of 11 P-1 Line #118 Volume 5 - 19 === page 98 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 20 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6024 / Construction & Maint Equip Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 190.854 190.854 190.854 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 91.269 0.000 91.269 88.005 82.560 88.998 76.983 76.983 76.983 105.592 105.592 105.592 - - - - - - 91.269 0.000 91.269 88.005 82.560 88.998 To FY 2031 Complete - Total - 90.856 Continuing - Continuing - 90.856 Continuing - Continuing - - - - - - - - 91.269 0.000 91.269 88.005 82.560 88.998 90.856 Continuing Continuing 0.485 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.190 0.400 2.610 - 2.610 2.625 0.149 0.520 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This funding directly enables the Naval Expeditionary Combat Forces (NECF) to execute vital missions across the spectrum of conflict, from supporting Distributed Maritime Operations and Expeditionary Advanced Base Operations to providing Humanitarian Assistance/Disaster Relief and Defense Support of Civil Authorities. It achieves this by: -Procuring and Recapitalizing Mission-Essential Equipment: This budget line provides for the procurement and recapitalization of construction, maintenance, and logistics equipment essential for: o Operational Plan (OPLAN) Execution: Equipping NECF to successfully execute their roles in a contested maritime environment, directly supporting Fleet operations and Maritime Logistics Campaign Plans. o Partner Nation Support: Building and strengthening alliances through joint training exercises and providing critical assistance during Humanitarian Assistance/Disaster Relief (HADR) operations. o Contested Logistics: Bridging the gap between shore-based logistics and the fleet through efficient reload, resupply, refuel, revive, and repair operations. - Addressing Critical Capability Gaps: o Establishing a Pacific-focused Naval Cargo Handling Battalion (NCHB): This enhances fleet lethality and operational availability by providing forward-deployed Vertical Launch System (VLS) reload capability for surface combatants. o Expanding Underwater Construction and Port Damage Repair Capacity: The addition of six Underwater Construction Dive Detachments and six Port Damage Repair Companies bolsters the NECF's ability to rapidly respond to contingencies and ensure operational access in contested environments. - Averting a Looming Readiness Crisis: o With 95% of NECF construction, weight handling, and material handling equipment projected to reach end-of-service life by 2030, this recapitalization effort is not just an investment in future capabilities, but a critical requirement to prevent a significant degradation in operational readiness. Types of equipment funded by this LI are: Earth Moving Equipment: LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 1 of 25 P-1 Line #120 Volume 5 - 21 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6024 / Construction & Maint Equip Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Earth moving equipment is not just about moving dirt; it's about enabling the Naval Construction Force (NCF) to rapidly establish, operate from, and sustain operations in austere and contested environments. This equipment forms the very foundation upon which the NCF executes its critical mission set: - Advanced Base Construction: From clearing landing zones to building expeditionary airfields and port facilities, this equipment is essential for projecting power and sustaining operations in remote and challenging locations. - Airfield Damage Repair: In a contested environment, rapid airfield repair is crucial to maintaining air superiority. This equipment enables the NCF to quickly repair runways and taxiways, ensuring uninterrupted air operations. - Port Damage Repair: Maintaining open and functioning seaports is critical for logistics and force projection. This equipment empowers the NCF to rapidly repair damaged piers, dredging channels, and restoring port operations, ensuring the uninterrupted flow of supplies and personnel. Miscellaneous Construction Equipment: The Navy Expeditionary Combat Forces (NECF) utilize a diverse range of miscellaneous construction equipment categorized into four primary types: 1. Concrete and Asphalt Equipment: This category encompasses equipment used in concrete and asphalt production and placement, including portable concrete mixers, rock crushers, asphalt and water distributors, aggregate spreaders, and asphalt/rubberized compound heating kettles. This equipment is crucial for constructing and maintaining advanced bases, forward port facilities, runways, taxi aprons, and other paved work areas. 2. Pneumatic & Drilling Equipment: This category includes portable air compressors of varying sizes and capacities, rock drills for quarry operations, pile hammers and extractors for constructing and maintaining waterfront structures (causeways, docks, piers, and wharves), earth augers for utility installation (electrical and communications), and well drilling machines for providing potable water at campsites and forward operating bases. 3. Power Generation & Lighting: This category comprises portable floodlight trailers equipped with 6kW generators, enabling 24/7 construction operations. Additionally, standardized generators, managed under the Department of Defense Mobile Electric Power Program (PM-MEP), provide power for tools, runway lighting, and backup electrical systems. 4. Maintenance & Support Equipment: This category includes welders, decontamination apparatus, mobile machine shops, and shredders. This equipment supports various maintenance, repair, and construction activities, as well as personnel and equipment decontamination. Cranes (Weight Handling Equipment): The Navy Expeditionary Combat Forces (NECF) employ a variety of cranes for weight handling, including truck-mounted, wheel-mounted, and crawler cranes. Truck-mounted cranes, featuring either lattice or hydraulic booms, range in capacity from 25 to 300 tons. Wheel-mounted cranes, utilizing hydraulic booms, offer capacities from 8 to 200 tons. Crawler cranes are specifically designed for dragline and clamshell operations in challenging terrain inaccessible to truck or wheel-mounted cranes. These are particularly valuable for Navy Expeditionary Logistic Forces in performance of Vertical Launch Operations, and Naval Construction Forces for Expeditionary Port Damage Repair Ops. Expeditionary Material Handling Equipment (ExMHE): This program invests in critical Expeditionary Material Handling Equipment (ExMHE) to meet operational demands and replace obsolete, non-repairable equipment used across global Navy operations. ExMHE is essential for equipping and sustaining expeditionary forces, empowering them to effectively execute combat, combat support, and combat service support missions worldwide. In addition to supporting Expeditionary Combat Forces, the funds also enable PW mission by funding recapitalization of construction and maintenance equipment essential to shore installation operations. Public Works personnel use this equipment to sustain the infrastructure that underpins warfighter readiness, installation resilience, and operational continuity across the Navy and Marine Corps enterprise. This capability supports a wide range of critical functions from airfield and road maintenance to utility system excavation, debris clearance, and emergency response. Though the equipment parallels that used by Expeditionary units, it is configured and employed specifically for long-term infrastructure support at fixed shore installations, where aging assets and increasing maintenance costs challenge mission execution. Timely investment in this equipment ensures PW remains capable of delivering responsive, safe, and efficient infrastructure support across the globe, whether enabling force deployment, recovery from natural disasters, or execution of long-range sustainment priorities. Funding PW capability under this line reinforces the Navy's ability to sustain shore-based infrastructure in direct support of force readiness and longterm mission success. LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 2 of 25 P-1 Line #120 Volume 5 - 22 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6024 / Construction & Maint Equip Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Cranes - Weight Handling Equipment (WHE) - Expeditionary]: includes Truck or Wheel-Mounted Cranes, Straddle Lifts, and Crawler Cranes. Truck Mounted Cranes have either lattice or hydraulic booms and range in size from 25 to 300 tons. Wheel- mounted cranes have hydraulic booms and range in size from 8 to 200 tons. [P40A / Earthmoving Equipment - Expeditionary]: Earth Moving Equipment for Expeditionary Navy is funding end items to support the Pier Damage Repair and Airfield Damage Repair Capabilities of the Seabees. In addition, recapitalization of over age equipment for the Naval Beach Groups, Naval Special Warfare and Navy Medical communities is also funded. The recapitalization of equipment in these units supports ship to shore and beach operations, expeditionary medical facility set up, and special operations. [P40A / MOBILE ELEVATING WORK PLATFORMS (MEWP) - PW]: Mobile Elevating Work Platforms (MEWP) - also known as Aerial Work Platforms (AWP) or manlifts. These can be of various sizes and lengths ranging anywhere from 40 feet to 120 feet and up to provide access to hard-to-reach areas on construction sites and on the piers. [P40A / MISC ELECTRICAL CONSTRUCTION EQUIPMENT - PW]: Miscellaneous Electrical Construction Equipment - This group consists of mobile Air Compressors and Arc Welders of various sizes and capacities for construction and maintenance projects; portable Floodlight Trailer/Generator Sets to provide around-the-clock lighting/power to power tools, runway lighting, and backup systems for electrical power distribution. This equipment is part of the DOW Mobile Electric Power Program (PM-MEP) which provides reliable standardized generators for all DOW components. [P40A / Miscellaneous Construction Equipment - Expeditionary]: Miscellaneous Construction Equipment - consists of Asphalt Pavers, Concrete Mixers, Water/Asphalt Distribution Trucks, decontamination apparatus, machine shop trailers and shredders, Snow Plow Rollover Trucks. This equipment is used for a variety of maintenance, repair and construction operations and for purification and decontamination of personnel and equipment. [P40A / Acquisition Support - Expeditionary]: Acquisition support provides for government oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (DCRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the delivery of equipment. [P40A / Acquisition Support]: Acquisition support provides for government execution and oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (DCRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the procurement and delivery of equipment. LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 3 of 25 P-1 Line #120 Volume 5 - 23 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6024 / Construction & Maint Equip Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Construction & Maint Equip P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 190.854 - / 76.983 - / 105.592 - / 91.269 - / 190.854 - / 76.983 - / 105.592 - / 91.269 - / - - / 91.269 / 0.000 - / 91.269 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Expeditionary: The FY27 funding supports the Navy Expeditionary Forces by continuing the initial outfitting of Airfield Damage Repair equipment to achieve Initial Operating Capability (IOC). It also funds Pier Damage Repair (PDR) equipment sets necessary to meet IOC requirements. Additionally, this funding will provide essential equipment for the initial outfitting of the new NCHB-3, enabling it to fulfill its Required Operational Capabilities (ROC) in a Projected Operational Environment (POE), which includes rearming, refueling, and resupplying fleet assets. The increased investment in Construction and Maintenance Equipment for Expeditionary Forces includes $9.37 million for Earthmoving Equipment and $3.313 million for Material Handling Equipment. This investment addresses critical shortages in items listed on the units' Table of Allowance (TOA) and facilitates the necessary recapitalization of over-aged equipment. The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. The emphasis is filling gaps for critical equipment requirements associated with the Navy Response Plan and on recapitalizing older equipment is vital for improving readiness. Without reliable equipment in the fleet, there is significant risk in meeting in-theater operational mission requirements and deadlines for building, repairing, and maintaining critical infrastructure, such as roads, runways, and undertaking demolition, excavation, and underground utility work. Public Works: EARTHMOVING EQUIPMENT (BSO 52): Public Works (PW): FY27 reflects a decrease of $3.61M of Construction Equipment (C&E). This funding line is required to support the strategic recapitalization of NAVFAC'S aging and degraded Shore fleet, which is essential to maintaining resilient mission-ready installations. Much of the existing fleet is aged and has outlived its expected lifecycle, leading to increasing reliability concerns and escalating maintenance costs. This degradation impacts our ability to execute critical infrastructure projects on schedule and sustain operational readiness across the shore installations. This funding enables the replacement of mission-critical equipment required for key PW functions, including airfield and roadway construction and repair, utility excavation, facility demolition and emergency response. These capabilities directly affect the warfighter readiness. Without dependable equipment, project delays and mission degradation become likely, posing risks to force deployment timelines and the sustainment of critical infrastructure. Recapitalization this fleet ensures PW remains agile, responsive and fully equipped to delivery safe, reliable, and timely support to naval shore installations and warfighter readiness. LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 4 of 25 P-1 Line #120 Volume 5 - 24 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Construction & Maint Equip Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) CRANES - WEIGHT HANDLING EQUIPMENT (WHE) - PW 1.1) EC 8246-01 CRANE TRUCK MOUNTED HYDRAULIC UP TO 30 TON A - - - 436,604.00 1 0.437 - - - - - - - - - - - - - - 6.090 - - - - - - - - - - - - - - - - 2.189 - - - - - - - - - - - - - - 8.960 - - - - - - - - - - - - - - - - - 0.721 - - - - - - - - - - - - - - - - - 2.486 840,021.00 3 2.520 865,305.00 1 0.865 - - - - - - - - - - - 14.022 1,061K 2 2.122 1,166K 2 2.331 1,189K 4 4.755 - - - 1,189K 4 4.755 - - 2.442 1,271K 2 2.541 - - - 1,322K 1 1.322 - - - 1,322K 1 1.322 - - 1.785 - - - - - 1,913K 1 1.913 - - - 1,913K 1 1.913 - - 8.219 750,861.00 0.751 - - - - - - - - - (†) 1.2) EC 8246-02 CRANE TRUCK MOUNTED HYDRAULIC 31-40 TON A 1.3) EC 8246-03 CRANE TRUCK MOUNTED HYDRAULIC 41-50 A - - 729,516.00 3 (†) TON 1.4) EC 8249-01 CRANE TRUCK MOUNTED HYDRAULIC 51-60 TON A 1.5) EC 8249-03 CRANE TRUCK MOUNTED HYDRAULIC 61-70 TON A 1.6) EC 8249-05 CRANE TRUCK MOUNTED HYDRAULIC 71-90 A (†) TON 1.7) EC 8249-10 CRANE TRUCK MOUNTED HYDRAULIC 91-100 TON (1)(†) 1.8) EC 8249-11 CRANE TRUCK MOUNTED HYDRAULIC 101-150 TON A A (2)(†) 1.9) EC 8249-15 CRANE TRUCK MOUNTED HYDRAULIC 151 TON & UP A - (3)(†) 1.10) EC 8253-02 CRANE WHEEL A LI 6024 - Construction & Maint Equip Navy 1 UNCLASSIFIED Page 5 of 25 - P-1 Line #120 - - Volume 5 - 25 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] MOUNTED SWING CAB 4X4 15-40 ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Construction & Maint Equip Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) TON 1.11) EC 8253-03 CRANE WHEEL MOUNTED SWING CAB 4X4 41-65 A - - 1.086 1,109K 3 - - - - - - - - - - - - 8.288 1,454K - - 3.174 - - - - 1,112K - - 1.793 1,829K - - 4.256 - - - 63.322 - 3.326 1,129K 3 3.388 1,152K - 863,627.00 2 1.727 - - 980,172.00 2 1.960 999,775.00 7.271 1,483K 2 2.967 1,513K - 1,700K 1 1.700 - 2 2.224 1,134K 2 2.268 1,157K 1 1.829 1,865K 1 1.865 - - - 2,225K 1 2.225 - 25.210 - 21.296 2 2.304 - - - 1,152K 2 2.304 - - - - - 1 1.000 - - - 999,775.00 1 1.000 1 1.513 - - - 1,513K 1 1.513 - - - - - 1.157 - - - 1,157K - - - - - - - - - - - - - - - - - - - 13.964 - - - - - 13.964 (†) TON 1.12) EC 8253-04 CRANE WHEEL MOUNTED SWING CAB 4X4 66-80 A - - - (†) TON 1.13) EC 8253-05 CRANE WHEEL MOUNTED SWING CAB 4X4 81-99 A (†) TON 1.14) EC 8253-06 CRANE WHEEL MOUNTED SWING CAB 4x4 100-119 A 5 (†) TON 1.15) EC 8253-08 CRANE WHEEL MOUNTED SWING CAB 4X4 130 TON AND UP A - - - - (†) 1.16) EC 8255-02 CRANE WHEEL MOUNTED ALL TERRAIN 51-100 A 1 1 1.157 (†) TON 1.17) EC 8255-03 CRANE WHEEL MOUNTED ALL TERRAIN 101-150 A (†) TON 1.18) EC 8255-04 CRANE WHEEL MOUNTED ALL TERRAIN 151 TON AND UP A (†) Subtotal: 1) CRANES - WEIGHT HANDLING EQUIPMENT (WHE) - PW - 2) Cranes - Weight Handling Equipment (WHE) - Expeditionary LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 6 of 25 P-1 Line #120 Volume 5 - 26 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.2) Expeditionary - A Crane RT 65T (4)(†) 2.3) Expeditionary - (†) MAIS Code Unit Cost ($) A (†) Lattice 2.5) Mobile Boat Hoist 100T (5)(†) A Subtotal: 2) Cranes - Weight Handling Equipment (WHE) Expeditionary 3) Earthmoving Equipment - Expeditionary 3.1) Expeditionary - Compact Track A (†) Loader 3.2) Expeditionary Loader Scoop Wheel 2.5CY 3.3) Expeditionary Backhoe Loader 1.3 CY A (7)(†) A (8)(†) 3.4) Expeditionary - (†) A Skid Steer Loader 3.5) Expeditionary - (†) A Excavator Hydraulic 3.6) Expeditionary Tractor Crawler 240 A (†) HP SLEP 3.8) Expeditionary - Mini Excavator Crawler A (9)(†) Subtotal: 3) Earthmoving Equipment - Expeditionary (Each) Unit Cost ($ M) - 1,321K Crane Wheel 110T 2.4) Expeditionary Crane Crawler 110T Qty - A FY 2025 Total Cost ($) 2 FY 2026 Total Cost Qty (Each) Aggregated Items Title: Construction & Maint Equip Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - ($) 867,000.00 1 0.867 - - 2.642 2,330K 2 4.659 1,498K 2 2.997 - 4 6.292 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 856,632.70 1 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.857 - - - 856,632.70 1 0.857 - - - - - - - - - - - - - - - - 1.530 - - - 1,530K - - - - - - 1,573K - - - - - - - - - 1,530K - - 2.642 - - 5.526 - - 9.289 - - 2.387 - - - - - 2.387 - - - 199,504.00 7 1.397 200,956.00 41 8.239 - - - - - - - - - - - - 348,400.00 5 1.742 - - - 368,000.00 44 16.192 - - - 368,000.00 44 16.192 0.189 246,000.00 7 1.722 - - - 197,000.00 3 0.591 - - - 197,000.00 3 0.591 1.164 116,634.00 6 0.700 - - - 116,634.00 6 0.700 - - - - 1 0.652 - - - 651,898.00 1 0.652 44 2.318 - - - 52,681.82 44 2.318 - 20.453 - - - - 20.453 1 0.364 - - - 363,630.00 1 0.364 1 0.302 - - - 301,804.00 1 0.302 1 1 1.530 (6) 189,000.00 1 - - - 103,727.27 10 1.037 105,800.00 11 - - - 924,000.00 2 1.848 - 2.482 632,910.00 1 0.633 840,000.00 620,500.00 4 - - 2 - - 1.680 651,898.00 - - - - - - - - - - - 2.671 - - 8.379 - - 11.083 - - 0.342 - - - - - 2.665 - - - 52,681.82 - - - - - 4) EARTHMOVING EQUIPMENT - PW 4.1) EC 4330-01 MINI EXCAVATOR, MULTIPURPOSE, TRUCK-MOUNTED A 356,500.00 1 0.357 363,630.00 (†) 4.2) EC 4340-00 EXCAVATOR, WHEEL-MOUNTED, A LI 6024 - Construction & Maint Equip Navy - - UNCLASSIFIED Page 7 of 25 - 301,804.00 P-1 Line #120 Volume 5 - 27 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] HYDRAULICOPERATED Code Unit Cost ($) Qty (Each) ($ M) Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) A - - 2.398 - - - - - 1.097 - - - - - 1.108 282,443.00 - - 3.998 123,425.00 - - 1.499 - - 0.701 123,149.00 - - 5.930 - - 2.271 260,758.00 - - - - - - - 434,001.00 3 1.302 - - - 434,001.00 3 1.302 (11) 4.4) EC 4350-02 MINI EXCAVATOR, CRAWLERMOUNTED MAIS FY 2026 Total Cost (10) 4.3) EC 4350-01 EXCAVATOR, CRAWLERMOUNTED, HYDRAULICOPERATED ID CD FY 2025 Total Cost Aggregated Items Title: Construction & Maint Equip A 110,881.00 1 0.111 113,098.00 1 0.113 - - - 113,098.00 1 0.113 3 0.847 286,292.00 5 1.431 293,187.00 6 1.759 - - - 293,187.00 6 1.759 2 0.247 125,894.00 4 0.504 128,411.00 5 0.642 - - - 128,411.00 5 0.642 1 0.410 414,847.46 1 0.415 - - - 414,847.46 1 0.415 1 0.128 - - - 128,124.00 1 0.128 (†) 4.5) EC 4420-01 GRADER ROAD MOTORIZED A (12)(†) 4.6) EC 4531-00 LOADER SCOOP, WHEEL-MOUNTED, A (†) 4X4 4.7) EC 4530-01 LOADER SCOOP, TRACK, BUCKET/ DOZER - - - 409,538.00 (†) 4.8) EC 4531-15 LOADER SCOOP, WHEEL-MOUNTED, 1.5 CY, 85 HP, W/ CAB A A 1 0.123 - - - 128,124.00 (13)(†) 4.9) EC 4531-25 LOADER SCOOP, WHEEL-MOUNTED, 2.5 CY, 100 HP, W/ A - - - 314,160.00 3 0.942 - - - - - - - - - 4 1.043 265,973.00 3 0.798 - - - - - - - - - 1.838 136,000.00 6 0.816 140,923.00 2 0.282 143,742.00 0.431 - - - 0.812 1 0.096 - - - - (†) CAB 4.10) EC 4531-45 LOADER SCOOP, WHEEL-MOUNTED, 4 CY, 170 HP, W/ A (†) CAB 4.11) EC 4532-00 LOADER, SKID A (†) STEER 4.12) EC 4532-02 LOADER, SKIDSTEER, CRAWLERMOUNTED 3 143,742.00 3 0.431 A 96,279.00 - - - - - - - - (†) LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 8 of 25 P-1 Line #120 Volume 5 - 28 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.13) EC 4532-11 LOADER, SKIDSTEER, BACKHOE/ A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) (Each) 99,719.00 FY 2026 Total Cost Qty Unit Cost ($ M) 3 Aggregated Items Title: Construction & Maint Equip ($) Qty (Each) 0.299 101,714.00 FY 2027 Base Total Cost Unit Cost ($ M) 2 ($) - - 1.277 - - 0.496 - - - - - - 0.151 - - - - - 1.225 - - - - - - - - - - - - 0.756 - - 0.056 - - 1.490 122,356.00 - - 0.646 - - - - - - - - 0.078 - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.203 - - - - - - - - - - - - - - - - - - - - - - - 160,784.00 1 0.161 - - - 160,784.00 1 0.161 - - - - 207,790.00 1 0.208 - - - 207,790.00 1 0.208 - - - - - 248,000.00 2 0.496 - - - 248,000.00 2 0.496 - - 0.607 613,823.00 1 0.614 - - - 613,823.00 1 0.614 1 0.078 - - - 77,608.00 1 0.078 - - - - 4 0.509 - - - 127,299.00 4 0.509 88,493.00 1 0.088 - - - 88,493.00 1 0.088 21,621.00 4 0.086 - - - 21,621.00 4 0.086 (†) BUCKET/FORKS 4.14) EC 4615-00 ROLLER, MOTORIZED, SELFPROPELLED PRT A 4.15) EC 4630-01 ROLLER, ROAD, 2 AXLE TANDEM, 3-6 A TON (14) 4.16) EC 4635-00 ROLLER, ROAD VIBRATORY, 3-18 TON A (15) 4.17) EC 4830-00 TRACTOR CRAWLER 105 HP NONSTANDARD A 4.18) EC 4851-00 TRACTOR CRAWLER 300 HP A (16)(†) 606,786.00 1 (†) NONSTANDARD 4.19) EC 4874-00 TRACTOR, WHEELED UP TO 49 HP A 75,333.00 1 0.075 - - - - - - - 77,608.00 (17)(†) 4.20) EC 4875-00 TRACTOR, WHEELED, 50-70 HP A 4.21) EC 4875-01 TRACTOR, WHEELED, 4X2, 50-70 HP, 3PT A HITCH, PTO - - 2 0.245 124,803.00 2 - 0.250 127,299.00 - - - - (18)(†) 4.22) EC 4875-02 TRACTOR, WHEELED, 4X2, 50-70 HP, LOADER 3/4 CY, BACKHOE A 4.23) EC 4875-04 TRACTOR, WHEELED, 4X2, 60 A (19) LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 9 of 25 P-1 Line #120 Volume 5 - 29 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD HP, LOADER 1 CY, BACKHOE Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (20) 4.24) EC 4877-00 TRACTOR, WHEELED, 90 HP MIN MAIS FY 2025 Total Cost Aggregated Items Title: Construction & Maint Equip A - - 3.376 151,136.00 3 0.453 154,159.00 1 0.154 - - - 8.028 207,114.00 4 0.828 211,256.00 3 0.634 215,481.00 - - 42.238 186,000.00 13 2.418 213,398.00 147,222.22 18 2.650 124,275.86 29 3.604 136,090.00 1 0.136 137,790.00 1 0.138 140,545.00 118,722.22 18 2.137 123,149.00 6 0.739 125,612.00 4 150,375.00 8 1.203 159,809.00 3 0.479 163,005.00 4 - - - - - - - - 1.939 - - - 9.635 - - - 0.422 - - - - - - - 1 0.141 - - - 140,545.00 1 0.141 0.502 128,124.00 7 0.897 - - - 128,124.00 7 0.897 0.652 163,265.00 4 0.653 - - - 163,265.00 4 0.653 (†) 4.25) EC 4877-01 TRACTOR, WHEELED, 4X4, 90 HP MIN, LOADER 1.5 CY, BACKHOE A 9 215,481.00 9 1.939 (21)(†) Subtotal: 4) EARTHMOVING EQUIPMENT - PW - - 5.072 - - 6.683 0.640 - - - - - - - - - - - 9.635 5) MOBILE ELEVATING WORK PLATFORMS (MEWP) - PW 5.1) EC 5460-10 MEWP 121 FT AND UP (TYPE 3 GROUP B) A 5.2) EC 5460-20 MEWP 91 FT TO 120 FT (TYPE 3 GROUP B) A 5.3) EC 5460-40 MEWP UP TO 40 FT A (†) (TYPE 3 GROUP B) 5.4) EC 5460-60 MEWP 41 FT TO 60 FT (TYPE 3 GROUP B) 3 210,817.00 2 210,817.00 2 0.422 (22)(†) - - - - - - - A (23)(†) 5.5) EC 5460-90 MEWP 61 FT TO 90 FT (TYPE 3 GROUP A (†) B) Subtotal: 5) MOBILE ELEVATING WORK PLATFORMS (MEWP) - PW - - 12.012 - - 1.994 - - 1.292 - - 2.113 - - - - - 2.113 - - - - - 0.034 - - - - - - - - - 0.035 - - - - - - 36,844.00 3 0.111 - - - 36,844.00 3 0.111 - - - - - - - 104,459.00 1 0.104 - - - 104,459.00 1 0.104 6) MISC ELECTRICAL CONSTRUCTION EQUIPMENT - PW 6.1) EC 3110-01 COMPRESSOR AIR 125 CFM WHEEL MOUNTED - 33,564.00 1 (†) 6.2) EC 3135-02 COMPRESSOR AIR 250 CFM WHEEL MOUNTED A A 35,000.00 1 (24) 6.4) EC 3165-00 COMPRESSOR A - LI 6024 - Construction & Maint Equip Navy - UNCLASSIFIED Page 10 of 25 P-1 Line #120 Volume 5 - 30 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] AIR 600 CFM SKID MOUNTED PORTABLE MAIS Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (25) 6.5) EC 5110-22 FLOODLIGHT SET TRUCK/TRAILER MOUNTED ID CD FY 2025 Total Cost Aggregated Items Title: Construction & Maint Equip A 15,710.14 69 1.084 - - - 17,129.00 93,962.96 27 2.537 - - - - - - 4.387 0.059 - - - 1.978 - - 1.565 110,000.00 - - 11.586 - - - - - - - - 3 0.051 17,545.00 4 0.070 - - - 17,545.00 4 0.070 - - 68,090.00 4 0.272 - - - 68,090.00 4 0.272 - - 60,925.00 1 0.061 - - - 60,925.00 1 0.061 0.120 122,301.00 2 0.245 - - - 122,301.00 2 0.245 1 0.116 - - - 116,290.00 1 0.116 (26)(†) 6.6) EC 5124-01 GENERATOR SET SKID/TRLR MTD 0-100 KW (MOBILE/ CONSTRUCT USE) A 6.7) EC 5124-02 GENERATOR SET SKID/TRLR MTD >100 KW (MOBILE/ CONSTRUCT USE) A 6.8) EC 5170-00 WELDER ELECTRIC ARC SKID/TRAILER/ TRUCK MTD A (27) 58,559.00 1 (28)(†) - - - 119,903.00 1 (†) NONSTANDARD 6.9) EC 5170-01 WELDER ARC WHEEL MOUNTED 300 AMP DC A 1 0.110 - - - 116,290.00 - 0.169 - - 0.205 - - 0.979 - - - - - 0.979 - - - 131,176.00 1 0.131 - - - - - - - - - - - - - 124,500.00 2 0.249 - - - - - - - - - - - - - - 452,733.00 1 0.453 - - - - - - - - - - 0.000 - - - 0.833 - - - - - - - - - (29)(†) Subtotal: 6) MISC ELECTRICAL CONSTRUCTION EQUIPMENT - PW 7) MISCELLANEOUS CONSTRUCTION EQUIPMENT -PW 7.2) EC 2521-00 TRUCK WATER A (†) DISTRIBUTION 7.3) EC 2522-00 DISTRIBUTOR ASPHALT TRUCK/ TRAILER COMM A (†) NONSTANDARD 7.4) EC 5757-00 SNOWPLOW ROLLOVER TRUCK MOUNTED A (†) NONSTANDARD Subtotal: 7) MISCELLANEOUS CONSTRUCTION EQUIPMENT -PW LI 6024 - Construction & Maint Equip Navy - - UNCLASSIFIED Page 11 of 25 P-1 Line #120 Volume 5 - 31 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Construction & Maint Equip Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 8) Miscellaneous Construction Equipment - Expeditionary 8.1) Expeditionary - Airfield Damage Repair (ADR) A - - - 656,067.00 2 1.312 - 6 2.875 427,329.00 - - - - - - - - - - - 2 0.855 - - - - - - - - - 5 0.576 - - - - - - - - - - - - - - - - - - - - 10 2.356 - - - - - - - - - (†) Tooling 8.2) Expeditionary Pier Damage Repair (PDR) Tooling A (†) 8.3) Expeditionary Concrete Pump A (†) 8.4) Expeditionary Concrete Mixer, Small A 8.5) Expeditionary - Concrete Mixer, A (†) Large 8.6) Expeditionary - (†) A Highflow Mud Pump 8.7) Expeditionary Asphalt Recycler A 8.8) Expeditionary - A (†) Pile Extractor 8.9) Expeditionary (†) A Pile Driver 8.10) Expeditionary - Welding Machine A 8.11) Expeditionary - A (30)(†) Generator 5KW (†) 8.13) Expeditionary - Generator, 35KW A (†) Trailer Mounted 8.14) Expeditionary Generator, 60KW (†) 8.16) Expeditionary Flood Lights, Trailer Mounted A (†) 8.19) Expeditionary - ADR SSL and CTL Work Tools A (†) 8.22) Compressors (31)(†) A A 77,850.00 20 1.557 479,166.67 106,500.00 4 0.426 - - - 33,213.74 131 4.351 - - - 388,750.00 4 1.555 404,176.00 67,500.00 4 0.270 - - - 72,750.00 4 0.291 - - - - - - - - - - - - 236,000.00 4 0.944 - - - - - - - - - - - - - - - 213,000.00 4 4 115,299.00 - 1.617 235,551.00 659,775.12 4 2.639 666,250.00 4 2.665 - - - - - - - - - 0.852 221,605.00 2 0.443 315,079.00 4 1.260 - - - - - - - - - 2 0.082 41,820.00 1 0.042 0.171 - - - - 26,000.00 2 0.052 - - - - - - - - - - 41,000.00 - - 42,840.00 - 4 - 42,840.00 - 4 - 0.171 - 123,500.00 8 0.988 136,170.00 11 1.498 129,639.33 52 6.741 141,671.00 6 0.850 - - - 141,671.00 6 0.850 39,568.97 58 2.295 40,353.00 56 2.260 52,953.00 38 2.012 33 1.723 - - - 52,222.00 33 1.723 44,000.00 20 0.880 44,880.00 39 1.750 45,778.00 44 2.014 - - - - - - - - - - - - 1,040K 3 3.119 - - - - - - - - - - - - - - - - - - - - 0.041 - - - LI 6024 - Construction & Maint Equip Navy - UNCLASSIFIED Page 12 of 25 52,222.00 41,000.00 1 P-1 Line #120 41,000.00 1 0.041 Volume 5 - 32 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Subtotal: 8) Miscellaneous Construction Equipment Expeditionary FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Construction & Maint Equip Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 13.174 - - 17.595 - - 19.808 - - 2.785 - - - - - 2.785 - - 3.227 - - 1.550 - - 1.444 - - 1.894 - - - - - 1.894 - - 0.621 - - - - - - - - - - - - - - - - - 3.848 - - 1.550 - - 1.444 - - 1.894 - - - - - 1.894 13 8.885 603,007.00 1.882 - - - 9) Integrated Logistics Support (ILS) Costs 9.1) Expeditionary ILS Costs A 9.2) PW - ILS COSTS A Subtotal: 9) Integrated Logistics Support (ILS) Costs 10) Material Handling Equipment - Expeditionary 10.1) Expeditionary - TRFK D 53LB PRT A (†) SLEP 10.2) Expeditionary TRFK 53K RTCH (†) 10.3) Expeditionary TRFK D 12LB PRT (†) 10.4) Expeditionary - (†) A A A TRFK 11K TELHDL 10.5) Expeditionary TRFK 16K RT (32)(†) 10.6) Expeditionary TRFK 25K DS W TOP A A (†) HANDLER 10.7) Expeditionary (†) A TRFK 20K RT 10.8) Expeditionary Truck K-Loader (33)(†) 10.9) Garrison MHE Systems (34)(†) 10.10) Expeditionary TRFK 5-6K LB (†) 10.11) Expeditionary 3-6K Electric MHE (†) 10.12) TRFK D 20LB PRT (†) A A A A A Subtotal: 10) Material Handling Equipment - Expeditionary 683,461.54 - - - - 1 - 0.603 615,067.00 - 2,076K - 3 1.845 627,369.00 3 627,369.00 3 1.882 5 10.383 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 16 6.672 - - 243,750.00 12 2.925 196,601.00 2 0.393 90,525.00 80 7.242 5 0.481 99,043.00 15 1.486 359,333.33 3 1.078 - 378,851.00 6 2.273 417,000.00 16 6.672 - - - 475,750.00 4 1.903 702,142.86 4.915 716,184.00 6 4.297 - - - - - - - 163,333.33 3 0.490 - - - 1,224K 4 4.896 1,250K 2 2.500 - - - 1,250K 2 2.500 971,333.33 3 2.914 - - - 1,377K 4 5.506 1,405K 15 21.068 - - - 1,405K 15 21.068 - - - - - 133,058.82 17 2.262 - - - 133,058.82 17 2.262 - - 96,121.00 - - 7 48,166.67 6 0.289 49,674.00 13 0.646 31,000.00 4 0.124 31,620.00 3 0.095 313,250.00 8 2.506 327,375.00 6 1.964 333,923.00 - 50,667.00 - 1 0.051 - - - - - - - - - - - - - - - - - - - 0.334 - - - - - - - - - 1 417,000.00 - - 28.356 - - 9.097 - - 31.071 - - 34.384 - - - - - 34.384 - - 11.005 - - 2.391 - - 2.588 - - 2.675 - - - - - 2.675 11) Acquisition Support - Expeditionary 11.1) Acquisition Support (35) A LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 13 of 25 P-1 Line #120 Volume 5 - 33 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Construction & Maint Equip FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Subtotal: 11) Acquisition Support Expeditionary - - 11.005 - - 2.391 - - 2.588 - - 2.675 - - - - - 2.675 Total - - 190.854 - - 76.983 - - 105.592 - - 91.269 - - - - - 91.269 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) The FY27 cost increase is due to the Naval installation's higher quantity requirements to meet mission-critical needs and the impact of inflation on raw material costs. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. The FY27 cost increase is due to the increase demand to replace aging equipment at numerous Naval installations. Increase addresses Naval Beach Group requirements for material handling. Funds will procure a Mobile Boat Hoist for Naval Special Warfare units to enable boats to be lifted in and out of the water for maintenance and repair Grouping established to distinguish Fleet Operational Deployable requirements from shore side requirements. The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (8) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. FY27 starts the Family of Buy cycle for this piece of equipment. (9) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 Cost increase driven by inflation of material. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. The FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 cost increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations and the impact of inflation on raw material costs. The quantity increase in FY27 helps address the recapitalization of overaged requirements. FY27 quantity increase is due to the Naval installation's higher quantity requirements to meet mission-critical needs and the impact of inflation on raw material costs. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the Naval installation's higher quantity requirements to meet mission-critical needs and the impact of inflation on raw material costs. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 Cost increase driven by inflation of material. LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 14 of 25 P-1 Line #120 Volume 5 - 34 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 (27) (28) (29) (30) P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Aggregated Items Title: Construction & Maint Equip FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations and the impact of inflation on raw material costs. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (31) (32) FY27 quantity increase is due to the increase demand to replace aging equipment at numerous Naval installations. The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (33) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (34) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (35) Acquisition support costs reflects government execution and oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (CDRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the procurement and delivery of equipment. LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 15 of 25 P-1 Line #120 Volume 5 - 35 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) CRANES - WEIGHT HANDLING EQUIPMENT (WHE) - PW 1.1) EC 8246-01 CRANE TRUCK MOUNTED HYDRAULIC UP TO 30 TON 2025 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2025 Aug 2025 1 436,604.00 Y 1.3) EC 8246-03 CRANE TRUCK MOUNTED HYDRAULIC 41-50 TON 2025 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Dec 2024 Dec 2025 3 729,516.00 Y 1.6) EC 8249-05 CRANE TRUCK MOUNTED HYDRAULIC 71-90 TON 2025 GROVE U.S. LLC / SHADY GROVE, PA MIPR DLA Jul 2025 Jul 2025 3 840,021.00 Y 1.6) EC 8249-05 CRANE TRUCK MOUNTED HYDRAULIC 71-90 TON 2026 GROVE U.S. LLC / SHADY GROVE, PA MIPR DLA Aug 2026 Aug 2027 1 865,305.00 Y 2025 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2025 Aug 2026 2 1,061K Y 2026 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2026 Aug 2027 2 1,166K Y 2027 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Oct 2026 Oct 2026 4 1,189K Y 2025 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Sep 2025 Dec 2026 2 1,271K Y 2027 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Jul 2027 Jul 2027 1 1,913K N 1.10) EC 8253-02 CRANE WHEEL MOUNTED SWING CAB 4X4 15-40 TON 2025 GROVE U.S. LLC / SHADY GROVE, PA MIPR DLA Jul 2025 Jul 2026 1 750,861.00 Y 1.11) EC 8253-03 CRANE WHEEL MOUNTED SWING CAB 4X4 41-65 TON 2025 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Jul 2025 Jul 2026 3 1,109K Y 1.11) EC 8253-03 CRANE WHEEL MOUNTED SWING CAB 4X4 41-65 TON 2026 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Aug 2026 Aug 2027 3 1,129K Y 1.11) EC 8253-03 CRANE WHEEL MOUNTED SWING CAB 4X4 41-65 TON 2027 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Oct 2026 Oct 2026 2 1,152K Y 1.7) EC 8249-10 CRANE TRUCK MOUNTED HYDRAULIC 91-100 TON (1) 1.7) EC 8249-10 CRANE TRUCK MOUNTED HYDRAULIC 91-100 TON (1) 1.7) EC 8249-10 CRANE TRUCK MOUNTED HYDRAULIC 91-100 TON (1) 1.8) EC 8249-11 CRANE TRUCK MOUNTED HYDRAULIC 101-150 TON (2) 1.9) EC 8249-15 CRANE TRUCK MOUNTED HYDRAULIC 151 TON & UP (3) LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 16 of 25 P-1 Line #120 Dec 2025 Volume 5 - 36 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C Method/Type or Funding Vehicle Aggregated Items: Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 1.12) EC 8253-04 CRANE WHEEL MOUNTED SWING CAB 4X4 66-80 TON 2026 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Aug 2026 Aug 2027 2 863,627.00 Y 1.13) EC 8253-05 CRANE WHEEL MOUNTED SWING CAB 4X4 81-99 TON 2026 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Aug 2026 Aug 2027 2 980,172.00 Y 1.13) EC 8253-05 CRANE WHEEL MOUNTED SWING CAB 4X4 81-99 TON 2027 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Oct 2026 Oct 2026 1 999,775.00 Y 1.14) EC 8253-06 CRANE WHEEL MOUNTED SWING CAB 4x4 100-119 TON 2025 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2025 Sep 2026 5 1,454K Y 1.14) EC 8253-06 CRANE WHEEL MOUNTED SWING CAB 4x4 100-119 TON 2026 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2026 Sep 2027 2 1,483K Y 1.14) EC 8253-06 CRANE WHEEL MOUNTED SWING CAB 4x4 100-119 TON 2027 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Oct 2026 Oct 2026 1 1,513K Y 1.15) EC 8253-08 CRANE WHEEL MOUNTED SWING CAB 4X4 130 TON AND UP 2026 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Aug 2026 Sep 2027 1 1,700K Y 1.16) EC 8255-02 CRANE WHEEL MOUNTED ALL TERRAIN 51-100 TON 2025 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Jul 2025 Jul 2025 2 1,112K Y 1.16) EC 8255-02 CRANE WHEEL MOUNTED ALL TERRAIN 51-100 TON 2026 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Aug 2026 Feb 2027 2 1,134K Y 1.16) EC 8255-02 CRANE WHEEL MOUNTED ALL TERRAIN 51-100 TON 2027 LINK-BELT CRANES LLP / LEXINGTON, KY MIPR DLA Oct 2026 Oct 2026 1 1,157K Y KATO WORKS CO., LTD / SHINAGAWA-KU, JAPAN MIPR JAPAN Sep 2025 Dec 2026 1 1,829K Y 1.17) EC 8255-03 CRANE WHEEL MOUNTED ALL TERRAIN 101-150 TON 2025 (36) (37) (Each) 1.17) EC 8255-03 CRANE WHEEL MOUNTED ALL TERRAIN 101-150 TON 2026 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Jan 2026 Jan 2027 1 1,865K Y 1.18) EC 8255-04 CRANE WHEEL MOUNTED ALL TERRAIN 151 TON AND UP 2026 Link Belt Cranes, LLP / Lexington, KY MIPR DLA Jul 2026 Jul 2027 1 2,225K Y MIPR DLA Aug 2025 Aug 2026 1 867,000.00 N RFP Issue Date 2) Cranes - Weight Handling Equipment (WHE) - Expeditionary 2.2) Expeditionary - Crane RT 65T (4) 2025 LI 6024 - Construction & Maint Equip Navy VARIOUS / VARIOUS UNCLASSIFIED Page 17 of 25 P-1 Line #120 Apr 2025 Volume 5 - 37 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Construction & Maint Equip FY Contractor and Location Method/Type or Funding Vehicle 2.3) Expeditionary - Crane Wheel 110T 2024 Link Belt / DLA MIPR DLA Oct 2024 Dec 2026 2 1,321K N Jan 2024 2.3) Expeditionary - Crane Wheel 110T 2025 Link Belt / DLA MIPR DLA Mar 2025 Mar 2026 2 2,330K N Jan 2024 2.3) Expeditionary - Crane Wheel 110T 2026 Link Belt / DLA MIPR DLA Aug 2026 Aug 2026 2 1,498K N Oct 2025 2.4) Expeditionary - Crane Crawler 110T Lattice 2026 TBD / TBD TBD DLA Aug 2026 Aug 2027 4 1,573K Y 2027 TBD / TBD C / TBD TBD Jun 2027 Jun 2027 1 1,530K N Dec 2026 3.1) Expeditionary - Compact Track Loader 2025 CATERPILLAR INC / PEORIA, IL MIPR DLA Aug 2025 Aug 2026 7 199,504.00 N Oct 2025 3.1) Expeditionary - Compact Track Loader 2026 CATERPILLAR INC / PEORIA, IL MIPR DLA Oct 2025 Oct 2025 41 200,956.00 N 2025 CATERPILLAR / PEORIA, IL MIPR DLA Aug 2025 Aug 2026 5 348,400.00 N 2024 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Oct 2024 Oct 2024 1 189,000.00 Y (8) 2025 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Jun 2025 Jun 2025 7 246,000.00 Y 3.4) Expeditionary - Skid Steer Loader 2025 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Apr 2025 Apr 2026 10 103,727.27 N Oct 2025 3.4) Expeditionary - Skid Steer Loader 2026 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Sep 2026 Sep 2028 11 105,800.00 N Oct 2025 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Oct 2026 Oct 2027 6 116,634.00 N Item Number / Title [DODIC] 2.5) Mobile Boat Hoist 100T O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip (5) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Feb 2027 3) Earthmoving Equipment - Expeditionary 3.2) Expeditionary - Loader Scoop Wheel 2.5CY (7) 3.3) Expeditionary - Backhoe Loader 1.3 CY (8) 3.3) Expeditionary - Backhoe Loader 1.3 CY 3.4) Expeditionary - Skid Steer Loader 2027 (38) 3.5) Expeditionary - Excavator Hydraulic 2025 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Apr 2025 Apr 2026 2 924,000.00 N 3.6) Expeditionary - Tractor Crawler 240 HP SLEP 2024 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Oct 2024 Apr 2025 4 620,500.00 Y 3.6) Expeditionary - Tractor Crawler 240 HP SLEP 2025 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Jul 2025 Jul 2026 1 632,910.00 Y 3.6) Expeditionary - Tractor Crawler 240 HP SLEP 2026 CATERPILLAR / PEORIA, IL MIPR Peoria, IL Jul 2026 Jul 2027 2 840,000.00 Y 2027 TBD / TBD C / TBD ** NO PCO ** Mar 2027 Mar 2027 44 52,681.82 N 3.8) Expeditionary - Mini Excavator Crawler (9) Oct 2025 Oct 2025 Dec 2026 4) EARTHMOVING EQUIPMENT - PW LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 18 of 25 P-1 Line #120 Volume 5 - 38 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Construction & Maint Equip FY Contractor and Location Method/Type or Funding Vehicle 4.1) EC 4330-01 MINI EXCAVATOR, MULTIPURPOSE, TRUCK-MOUNTED 2026 CATERPILLAR / PEORIA, IL MIPR DLA Aug 2026 Aug 2027 1 356,500.00 Y 4.1) EC 4330-01 MINI EXCAVATOR, MULTIPURPOSE, TRUCK-MOUNTED 2027 CATERPILLAR / PEORIA, IL MIPR DLA Oct 2026 Oct 2026 1 363,630.00 Y 4.4) EC 4350-02 MINI EXCAVATOR, CRAWLERMOUNTED 2026 Atlantic Diving Supply, Inc. / VIRGINIA BEACH, VA MIPR DLA Aug 2026 Jul 2027 1 110,881.00 Y 4.4) EC 4350-02 MINI EXCAVATOR, CRAWLERMOUNTED 2027 Atlantic Diving Supply, Inc. / VIRGINIA BEACH, VA MIPR DLA Oct 2026 Oct 2026 1 113,098.00 Y 2025 CATERPILLAR / PEORIA, IL MIPR DLA Jul 2025 Jun 2026 3 282,443.00 Y 2026 CATERPILLAR / PEORIA, IL MIPR DLA Aug 2026 Jul 2027 5 286,292.00 Y 2027 CATERPILLAR / PEORIA, IL MIPR DLA Oct 2026 Oct 2026 6 293,187.00 Y 4.6) EC 4531-00 LOADER SCOOP, WHEEL-MOUNTED, 4X4 2025 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA MIPR DLA Jul 2025 Jul 2025 2 123,425.00 Y 4.6) EC 4531-00 LOADER SCOOP, WHEEL-MOUNTED, 4X4 2026 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Jun 2026 Jun 2027 4 125,894.00 Y 4.6) EC 4531-00 LOADER SCOOP, WHEEL-MOUNTED, 4X4 2027 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Oct 2026 Oct 2026 5 128,411.00 Y 4.7) EC 4530-01 LOADER SCOOP, TRACK, BUCKET/DOZER 2026 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA MIPR DLA Jul 2026 May 2027 1 409,538.00 Y 4.7) EC 4530-01 LOADER SCOOP, TRACK, BUCKET/DOZER 2027 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA MIPR DLA Oct 2026 Oct 2026 1 414,847.46 Y 2025 Caterpillar, Inc / Mossville, IL MIPR DLA Jul 2025 May 2026 1 123,149.00 Y 4.9) EC 4531-25 LOADER SCOOP, WHEEL-MOUNTED, 2.5 CY, 100 HP, W/CAB 2026 Caterpillar, Inc / Mossville, IL MIPR DLA Jul 2026 May 2027 3 314,160.00 Y 4.10) EC 4531-45 LOADER SCOOP, WHEEL-MOUNTED, 4 CY, 170 HP, W/CAB 2025 Atlantic Diving Supply, Inc. / VIRGINIA BEACH, VA MIPR DLA Jul 2025 Nov 2025 4 260,758.00 Y 4.10) EC 4531-45 LOADER SCOOP, WHEEL-MOUNTED, 4 CY, 170 HP, W/CAB 2026 Atlantic Diving Supply, Inc. / VIRGINIA BEACH, VA MIPR DLA Jul 2026 Jun 2027 3 265,973.00 Y Item Number / Title [DODIC] 4.5) EC 4420-01 GRADER ROAD MOTORIZED (12) 4.5) EC 4420-01 GRADER ROAD MOTORIZED (12) 4.5) EC 4420-01 GRADER ROAD MOTORIZED (12) 4.8) EC 4531-15 LOADER SCOOP, WHEEL-MOUNTED, 1.5 CY, 85 HP, W/CAB (13) O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip LI 6024 - Construction & Maint Equip Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 19 of 25 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #120 RFP Issue Date Dec 2025 Volume 5 - 39 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Method/Type or Funding Vehicle Aggregated Items: Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 4.11) EC 4532-00 LOADER, SKID STEER 2025 Atlantic Diving Supply, Inc. / VIRGINIA BEACH, VA MIPR DLA Jul 2025 Jul 2025 6 136,000.00 Y 4.11) EC 4532-00 LOADER, SKID STEER 2026 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA MIPR DLA Jun 2026 Mar 2027 2 140,923.00 Y 4.11) EC 4532-00 LOADER, SKID STEER 2027 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA MIPR DLA Oct 2026 Oct 2026 3 143,742.00 N 4.12) EC 4532-02 LOADER, SKIDSTEER, CRAWLER-MOUNTED 2025 CATERPILLAR INC / PEORIA, IL MIPR DLA Jul 2025 Apr 2026 1 96,279.00 Y 4.13) EC 4532-11 LOADER, SKIDSTEER, BACKHOE/BUCKET/ FORKS 2025 CATERPILLAR INC / PEORIA, IL MIPR DLA Jul 2025 Jun 2026 3 99,719.00 Y 4.13) EC 4532-11 LOADER, SKIDSTEER, BACKHOE/BUCKET/ FORKS 2026 CATERPILLAR INC / PEORIA, IL MIPR DLA Jul 2026 Jun 2027 2 101,714.00 Y 2027 CATERPILLAR / IRVING, TX C / TBD ** NO PCO ** Oct 2026 Oct 2026 2 248,000.00 N 4.18) EC 4851-00 TRACTOR CRAWLER 300 HP NONSTANDARD 2026 John Deere / Cary, NC MIPR DLA Jul 2026 Jul 2027 1 606,786.00 Y 4.18) EC 4851-00 TRACTOR CRAWLER 300 HP NONSTANDARD 2027 John Deere / Cary, NC MIPR DLA Oct 2026 Oct 2026 1 613,823.00 Y 2025 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Jul 2025 Jul 2025 1 75,333.00 Y 2025 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Jul 2025 Jul 2026 2 122,356.00 Y 2026 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Aug 2026 Aug 2027 2 124,803.00 Y 2027 ATLANTIC DIVING SUPPLY INC / VIRGINIA BEACH MIPR DLA Oct 2026 Oct 2026 4 127,299.00 Y 4.24) EC 4877-00 TRACTOR, WHEELED, 90 HP MIN 2025 Caterpillar, Inc / Mossville, IL MIPR DLA Jul 2025 Feb 2026 3 151,136.00 Y 4.24) EC 4877-00 TRACTOR, WHEELED, 90 HP MIN 2026 Caterpillar, Inc / Mossville, IL MIPR DLA Jul 2026 Feb 2027 1 154,159.00 Y 4.17) EC 4830-00 TRACTOR CRAWLER 105 HP NONSTANDARD (16) 4.19) EC 4874-00 TRACTOR, WHEELED UP TO 49 HP (17) 4.21) EC 4875-01 TRACTOR, WHEELED, 4X2, 50-70 HP, 3PT HITCH, PTO (18) 4.21) EC 4875-01 TRACTOR, WHEELED, 4X2, 50-70 HP, 3PT HITCH, PTO (18) 4.21) EC 4875-01 TRACTOR, WHEELED, 4X2, 50-70 HP, 3PT HITCH, PTO (18) LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 20 of 25 (Each) P-1 Line #120 RFP Issue Date Volume 5 - 40 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 4.25) EC 4877-01 TRACTOR, WHEELED, 4X4, 90 HP MIN, LOADER 1.5 CY, BACKHOE (21) 4.25) EC 4877-01 TRACTOR, WHEELED, 4X4, 90 HP MIN, LOADER 1.5 CY, BACKHOE (21) 4.25) EC 4877-01 TRACTOR, WHEELED, 4X4, 90 HP MIN, LOADER 1.5 CY, BACKHOE (21) O O C Aggregated Items: Construction & Maint Equip FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2025 JCB / New MFG - Loc MIPR DLA Jul 2025 Feb 2026 4 207,114.00 Y 2026 CATERPILLAR / PEORIA, IL MIPR DLA Jul 2026 Jul 2027 3 211,256.00 Y 2027 CATERPILLAR / PEORIA, IL MIPR DLA Oct 2026 Oct 2026 9 215,481.00 Y MIPR DLA Aug 2025 Aug 2026 3 213,398.00 Y MIPR DLA Jul 2025 Jul 2026 1 136,090.00 Y Qty (Each) RFP Issue Date Dec 2025 5) MOBILE ELEVATING WORK PLATFORMS (MEWP) - PW 5.1) EC 5460-10 MEWP 121 FT 2025 JLG INDUSTRIES, INC. / MCCONNELLSBURG, PA 5.3) EC 5460-40 MEWP UP TO 40 FT (TYPE 3 GROUP B) 2025 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA 5.3) EC 5460-40 MEWP UP TO 40 FT (TYPE 3 GROUP B) 2026 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA MIPR DLA Jul 2026 Jul 2027 1 137,790.00 Y 5.3) EC 5460-40 MEWP UP TO 40 FT (TYPE 3 GROUP B) 2027 ALDEN EQUIPMENT INC. / AMSTERDAM, NY C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 140,545.00 Y 2025 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA MIPR DLA Jun 2025 Jun 2026 6 123,149.00 Y 2026 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA MIPR DLA Jul 2026 Jul 2027 4 125,612.00 Y 2027 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA C / TBD ** NO PCO ** Oct 2026 Oct 2026 7 128,124.00 Y 5.5) EC 5460-90 - MEWP 61 FT TO 90 FT (TYPE 3 GROUP B) 2025 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA MIPR DLA Jul 2025 Jul 2026 3 159,809.00 Y 5.5) EC 5460-90 - MEWP 61 FT TO 90 FT (TYPE 3 GROUP B) 2026 JLG INDUSTRIES INC. / MCCONNELLSBURG, PA MIPR DLA Jun 2026 Jun 2027 4 163,005.00 Y 5.5) EC 5460-90 - MEWP 61 FT TO 90 FT (TYPE 3 GROUP B) 2027 VARIOUS / VARIOUS C / TBD ** NO PCO ** Oct 2026 Oct 2026 4 163,265.00 Y 2026 INGERSOLL RAND / MOCKSVILLE, NC MIPR DLA Jul 2026 Jul 2027 1 33,564.00 Y 2026 INGERSOLL RAND / MOCKSVILLE, NC MIPR DLA Sep 2026 Jun 2027 3 17,129.00 Y AND UP (TYPE 3 GROUP B) (22) 5.4) EC 5460-60 - MEWP 41 FT TO 60 FT (TYPE 3 GROUP B) (23) 5.4) EC 5460-60 - MEWP 41 FT TO 60 FT (TYPE 3 GROUP B) (23) 5.4) EC 5460-60 - MEWP 41 FT TO 60 FT (TYPE 3 GROUP B) (23) (39) (39) 6) MISC ELECTRICAL CONSTRUCTION EQUIPMENT - PW 6.1) EC 3110-01 COMPRESSOR AIR 125 CFM WHEEL MOUNTED 6.5) EC 5110-22 FLOODLIGHT SET TRUCK/TRAILER MOUNTED (26) LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 21 of 25 P-1 Line #120 Volume 5 - 41 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Method/Type or Funding Vehicle Aggregated Items: Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 6.5) EC 5110-22 FLOODLIGHT SET TRUCK/TRAILER MOUNTED 2027 INGERSOLL RAND / MOCKSVILLE, NC MIPR DLA Oct 2026 Oct 2026 4 17,545.00 Y 6.7) EC 5124-02 GENERATOR SET SKID/TRLR MTD >100 KW 2025 INGERSOLL RAND / MOCKSVILLE, NC MIPR DLA Aug 2025 Nov 2025 1 58,559.00 Y 6.8) EC 5170-00 WELDER ELECTRIC ARC SKID/TRAILER/ TRUCK MTD NONSTANDARD 2026 CERTIFIED STAINLESS SERVICE INC / CERES, CA MIPR DLA Aug 2026 Aug 2027 1 119,903.00 Y 6.8) EC 5170-00 WELDER ELECTRIC ARC SKID/TRAILER/ TRUCK MTD NONSTANDARD 2027 CERTIFIED STAINLESS SERVICE INC / CERES, CA MIPR DLA Oct 2026 Oct 2026 2 122,301.00 Y 2025 CERTIFIED STAINLESS SERVICE / CERES, CA MIPR DLA Sep 2025 Sep 2026 1 110,000.00 Y (26) (MOBILE/CONSTRUCT USE) (28) 6.9) EC 5170-01 WELDER ARC WHEEL MOUNTED 300 AMP DC (29) (Each) RFP Issue Date 7) MISCELLANEOUS CONSTRUCTION EQUIPMENT -PW 7.2) EC 2521-00 TRUCK WATER DISTRIBUTION 2026 CATERPILLAR / IRVING, TX MIPR DLA Aug 2026 Aug 2027 1 131,176.00 Y 7.3) EC 2522-00 DISTRIBUTOR ASPHALT TRUCK/TRAILER COMM NONSTANDARD 2026 CATERPILLAR / IRVING, TX MIPR DLA Nov 2026 May 2027 2 124,500.00 Y 7.4) EC 5757-00 SNOWPLOW ROLLOVER TRUCK MOUNTED NONSTANDARD 2026 M-B COMPANIES / CHILTON, WI MIPR GSA Aug 2026 Feb 2027 1 452,733.00 Y 8) Miscellaneous Construction Equipment - Expeditionary 8.1) Expeditionary - Airfield Damage Repair (ADR) Tooling 2025 CATERPILLAR / PEORIA, IL C / FFP DLA Apr 2025 Apr 2026 2 656,067.00 N 8.2) Expeditionary - Pier Damage Repair (PDR) Tooling 2025 CATERPILLAR INC / PEORIA, IL C / FFP DLA Feb 2025 Feb 2025 6 479,166.67 Y 8.2) Expeditionary - Pier Damage Repair (PDR) Tooling 2026 TBD / TBD C / TBD ** NO PCO ** Aug 2026 Aug 2026 2 427,329.00 Y 8.3) Expeditionary - Concrete Pump 2026 TBD / TBD C / TBD ** NO PCO ** Aug 2026 Aug 2027 5 115,299.00 Y 8.5) Expeditionary - Concrete Mixer, Large 2025 ProAll International MGF. Inc / Kansas City, MO MIPR GSA Apr 2025 Apr 2026 4 404,176.00 Y 8.5) Expeditionary - Concrete Mixer, Large 2026 TBD / TBD C / TBD ** NO PCO ** Aug 2026 Aug 2027 10 235,551.00 Y 8.6) Expeditionary - Highflow Mud Pump 2026 EDDY PUMP / CA MIPR VA Oct 2025 Oct 2026 4 72,750.00 Y 8.8) Expeditionary - Pile Extractor 2025 CATERPILLAR / PEORIA, IL MIPR DLA Jun 2026 Dec 2026 4 659,775.12 Y LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 22 of 25 P-1 Line #120 Oct 2025 Feb 2025 Volume 5 - 42 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Construction & Maint Equip FY Contractor and Location Method/Type or Funding Vehicle 8.8) Expeditionary - Pile Extractor 2026 CATERPILLAR / PEORIA, IL MIPR DLA Jun 2026 Dec 2026 4 666,250.00 Y 8.9) Expeditionary - Pile Driver 2025 TBD / TBD TBD ** NO PCO ** Jun 2026 Jun 2027 2 221,605.00 Y 8.9) Expeditionary - Pile Driver 2026 TBD / TBD TBD ** NO PCO ** Sep 2026 Sep 2027 4 315,079.00 Y 2025 Welding World Inc / Miami, FL MIPR DLA Jan 2026 Jul 2026 2 41,000.00 N 2026 Welding World Inc / Miami, FL MIPR DLA Sep 2026 Mar 2027 1 41,820.00 Y 2027 Welding World Inc / Miami, FL MIPR DLA Sep 2027 Mar 2028 4 42,840.00 Y 8.11) Expeditionary - Generator 5KW 2026 TBD / TBD C / TBD ** NO PCO ** Aug 2026 Feb 2027 2 26,000.00 N 8.13) Expeditionary - Generator, 35KW Trailer Mounted 2024 ARMY PM MEP / FT Belvoir, VA MIPR Army MEP Apr 2024 Apr 2025 8 123,500.00 Y 8.13) Expeditionary - Generator, 35KW Trailer Mounted 2025 ARMY PM MEP / FT Belvoir, VA MIPR Army MEP Apr 2025 Apr 2026 11 136,170.00 Y 8.13) Expeditionary - Generator, 35KW Trailer Mounted 2026 ARMY PM MEP / FT Belvoir, VA MIPR Army MEP Apr 2026 Apr 2027 52 129,639.33 Y 8.14) Expeditionary - Generator, 60KW 2024 VARIOUS / VARIOUS MIPR DLA Oct 2024 Oct 2024 58 39,562.50 Y 8.14) Expeditionary - Generator, 60KW 2025 VARIOUS / VARIOUS MIPR DLA Oct 2025 Oct 2025 56 40,353.00 Y 8.14) Expeditionary - Generator, 60KW 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2026 38 52,953.00 Y 8.14) Expeditionary - Generator, 60KW 2027 TBD / TBD C / TBD ** NO PCO ** Sep 2027 Sep 2027 33 52,222.00 Y 8.16) Expeditionary - Flood Lights, Trailer Mounted 2024 VARIOIUS / VARIOUS MIPR DLA Oct 2024 Apr 2025 20 44,000.00 Y 8.16) Expeditionary - Flood Lights, Trailer Mounted 2025 VARIOIUS / VARIOUS MIPR DLA Jul 2025 Jul 2026 39 44,880.00 Y 8.16) Expeditionary - Flood Lights, Trailer Mounted 2026 VARIOIUS / VARIOUS MIPR DLA Oct 2025 Oct 2026 44 45,778.00 Y 8.19) Expeditionary - ADR SSL and CTL Work Tools 2025 Oceanetics / WV MIPR DLA Apr 2025 Apr 2026 3 1,040K Y Oct 2025 2027 TBD / TBD C / FFP DLA Apr 2027 Apr 2027 1 41,000.00 N Apr 2027 US Marine Corp / USMC FM MIPR USMC FM Aug 2024 Mar 2025 1 591,183.00 Y Item Number / Title [DODIC] 8.10) Expeditionary - Welding Machine (30) 8.10) Expeditionary - Welding Machine (30) 8.10) Expeditionary - Welding Machine (30) 8.22) Compressors (31) O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Oct 2025 Oct 2025 Feb 2027 10) Material Handling Equipment - Expeditionary 10.1) Expeditionary - TRFK D 53LB PRT SLEP 2024 LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 23 of 25 P-1 Line #120 Volume 5 - 43 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Construction & Maint Equip FY Contractor and Location Method/Type or Funding Vehicle 10.1) Expeditionary - TRFK D 53LB PRT SLEP 2025 US Army / US Army MIPR ARMY FM Mar 2025 Mar 2026 1 603,007.00 Y 10.1) Expeditionary - TRFK D 53LB PRT SLEP 2026 US Army / US Army MIPR ARMY FM Oct 2025 Oct 2026 3 615,067.00 N 10.2) Expeditionary - TRFK 53K RTCH 2026 TBD / TBD C / TBD DLA Jun 2026 Jun 2027 5 2,076K Y 10.3) Expeditionary - TRFK D 12LB PRT 2025 Liftking / Ontario, Canada MIPR DLA Dec 2024 Dec 2025 2 196,601.00 Y 10.4) Expeditionary - TRFK 11K TELHDL 2025 HYSTER-YALE GROUP, INC / GREENVILLE , NC MIPR DLA Sep 2025 Jun 2026 5 96,121.00 Y 10.4) Expeditionary - TRFK 11K TELHDL 2026 HYSTER-YALE GROUP, INC / GREENVILLE , NC MIPR DLA Oct 2025 Jul 2026 15 99,043.00 Y (32) 2026 CATERPILLAR / PEORIA, IL MIPR DLA Oct 2025 Oct 2025 6 378,851.00 Y 10.6) Expeditionary - TRFK 25K DS W TOP HANDLER 2025 Liftking / Ontario, Canada MIPR DLA May 2025 May 2026 7 702,142.86 Y 10.6) Expeditionary - TRFK 25K DS W TOP HANDLER 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 6 716,184.00 Y 10.7) Expeditionary - TRFK 20K RT 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 4 1,224K Y 10.7) Expeditionary - TRFK 20K RT 2027 TBD / TBD C / TBD ** NO PCO ** Aug 2027 Aug 2028 2 1,250K N 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2026 4 1,377K N 2027 TBD / TBD C / TBD ** NO PCO ** Sep 2027 Sep 2027 15 1,405K N Item Number / Title [DODIC] 10.5) Expeditionary - TRFK 16K RT 10.8) Expeditionary - Truck KLoader (33) 10.8) Expeditionary - Truck KLoader (33) (34) O O C P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2027 TBD / TBD TBD TBD Mar 2027 Mar 2027 17 133,058.82 Y 10.10) Expeditionary - TRFK 5-6K LB 2025 HYSTER-YALE GROUP, INC / GREENVILLE , NC MIPR DLA Dec 2024 Dec 2025 13 49,674.00 Y 10.10) Expeditionary - TRFK 5-6K LB 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 1 50,667.00 N 10.11) Expeditionary - 3-6K Electric MHE 2024 HYSTER-YALE GROUP, INC / GREENVILLE , NC MIPR DLA Mar 2024 Mar 2024 4 31,000.00 Y 10.11) Expeditionary - 3-6K Electric MHE 2025 HYSTER-YALE GROUP, INC / GREENVILLE , NC MIPR DLA Oct 2024 Oct 2024 3 31,620.00 Y 10.12) TRFK D 20LB PRT 2024 Liftking / Ontario, Canada MIPR DLA May 2024 May 2025 2 320,956.00 Y 10.12) TRFK D 20LB PRT 2025 Liftking / Ontario, Canada MIPR DLA Aug 2025 Aug 2026 6 327,375.00 Y 10.12) TRFK D 20LB PRT 2026 TBD / TBD MIPR DLA Aug 2026 Aug 2027 1 333,923.00 Y 10.9) Garrison MHE Systems LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 24 of 25 P-1 Line #120 RFP Issue Date Volume 5 - 44 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 P-1 Line Item Number / Title: 6024 / Construction & Maint Equip Aggregated Items: Construction & Maint Equip Footnotes: (36) (37) (38) LOCAL PROCUREMENT Local Procurement The lead is driven by the added procurement and integration of the JP8 engine, which requires additional tooling by the manufacturers as it is not the standard industry engine. The skid steer is a modified Commercial Off The Shelf (COTS) item which requires the use of JP8 fuel in order to operate in austere locations. (39) LONG PROCUREMENT LEAD TIME DUE TO SUPPLY CHAIN DELAYS LI 6024 - Construction & Maint Equip Navy UNCLASSIFIED Page 25 of 25 P-1 Line #120 Volume 5 - 45 === page 124 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 46 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6027 / Fire Fighting Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 83.595 23.006 27.675 17.107 0.000 17.107 16.027 19.452 19.904 - - - - - - - - - 83.595 23.006 27.675 17.107 0.000 17.107 16.027 19.452 19.904 - - - - - - - - - 83.595 23.006 27.675 17.107 0.000 17.107 16.027 19.452 19.904 To FY 2031 Complete 20.300 Continuing - Continuing - 20.300 Continuing - Total - Continuing - - 20.300 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line-item funds procurement of essential emergency response vehicles for Installations, i.e., aircraft fire/rescue trucks, specialized shore-based ship response apparatus, and structural/brush fire trucks and hazardous emergency response trucks. The aircraft fire/rescue trucks are used at Naval Air Stations for combating aircraft fires and rescue of aircraft crews. The trucks range in size from a small 19,000-pound Gross Vehicle Weight Rating (GVWR) pickup with utility body and twin-engine firefighting unit to the 68,000-pound GVWR crash truck which carries 3,000 gallons of water and 410 gallons of foam. The structural/brush fire trucks and specialized shore-based shipboard emergency vehicles with up to 82,000-pound GVWR are used at Naval activities in the same manner as municipal fire trucks in fighting structural, ships, and grass/wildland fires. The Navy's investment in ships, aircraft, facilities, personnel, and equipment mandates having adequate fire protection in highest state of readiness to respond. The requested funds are needed to comply with current National Fire Protection Association (NFPA) standards, sustain the Navy Firefighting Fleet and maintain an effective Firefighting Fleet Modernization Program consistent with findings identified in the DoW IG Report: D-2003-121 DoW Fire and Emergency Services Program. The Firefighting Fleet requires increased annual investments to ensure emergency response vehicles are within specified service life for safety, technological improvements, and maintenance sustainability. Highly reliable trucks are required as the emergency vehicles are key to success. Some older crash response trucks do not meet roll safety criteria and require continued replacement to ensure safe working limits. As firefighter staffing is expanded for new mission requirements the all-hazards emergency response mission expands, the Navy's firefighting apparatus must evolve to provide additional capabilities for emergency medical services, rescue, confined space, hazardous materials, shipboard firefighting, etc. The ability to save lives and protect property is essential in supporting the Navy's mission. The role of these trucks is to provide the Navy's response to structural fire emergencies, ship fire incidents, aircraft rescue firefighting crashes, emergency medical services incidents, all hazards public safety, and emergency response to terrorism incidents, and weapons of mass destruction. LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 1 of 8 P-1 Line #121 Volume 5 - 47 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6027 / Fire Fighting Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Fire Fighting Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 83.595 - / 23.006 - / 27.675 - / 17.107 - / 83.595 - / 23.006 - / 27.675 - / 17.107 - / - - / 17.107 / 0.000 - / 17.107 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request supports the ongoing replacing of aging equipment, standardization across installations, and procurement of high-capacity assets such as large rescue vehicles and pumpers, which are necessary to meet modern operational and safety standards. These assets are critical to Navy emergency response operations, safeguarding personnel, ships, aircraft, and infrastructure during shipboard and shore-based fire incidents. Annual replacement is essential to maintain minimum response capability; however, budget reductions often delay procurement, strain already overextended resources, and narrows the margin for safe and effective response during emergencies, particularly for forward deployed forces and high-risk Navy operations. Every deferred replacement compound risk, mandated response times, increasing mission failures, and jeopardizing the Navy's ability to contain catastrophic events that threaten personnel safety and operational continuity. Without sustained investment, the fleet will lose core emergency response functions, compromising readiness and the safety of Navy personnel, assets and mission. LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 2 of 8 P-1 Line #121 Volume 5 - 48 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Fire Fighting Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) AIRCRAFT FIRE/RESCUE 1.2) BSVE-7160-00TRUCK AIRCRAFT CRASH FIRE RESCUE 1000 GAL A 886,000.00 3 2.658 915,552.00 2 1.831 933,863.00 2 1.868 952,540.00 396,200.00 5 1.981 408,000.00 1 0.408 416,160.00 2 0.832 - 506,750.00 8 4.054 540,568.00 1 0.541 - 269,333.33 6 1.616 600,588.24 17 10.210 659,736.00 759,142.86 21 279,692.31 592,000.00 1 0.953 - - - 952,540.00 1 0.953 - - - - - - - - - - - - - - - - - - - - - - - - - - (†) 1.3) BSVE-7102-02TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB 2 AGENT A (†) RIV 1.4) BSVE-7601MH-HAZARDOUS MATERIAL/ EMERGENCY RESPONSE TRUCK MEDIUM - - (†) 1.5) BSVE-7601SH-HAZARDOUS MATERIAL/ EMERGENCY RESPONSE TRUCK SMALL A A - - - 296,082.00 3 0.888 2 1.319 672,930.00 4 2.692 686,388.00 3 2.059 - - - 686,388.00 3 2.059 15.942 819,349.00 4 3.277 835,735.00 3 2.507 852,449.00 3 2.557 - - - 852,449.00 3 2.557 13 3.636 306,515.00 1 0.307 3 0.957 - - - 318,898.00 3 0.957 3 1.776 612,000.00 2 1.224 624,240.00 (†) 1.6) BSVE-7160-01TRUCK AIRCRAFT CRASH FIRE RESCUE 1500 GALLON A (†) 1.7) BSVE-7190-01TRUCK AIRCRAFT CRASH FIRE RESCUE 3000 GALLON DRY CHEMICAL A (†) 1.8) BSVE-7102-01TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB A - - - 318,898.00 (1)(†) 1.9) BSVE-7102-03TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB A 3 1.873 - - - - - - - - - 10.660 - - 6.526 - - - - - 6.526 (†) ENHANCED Subtotal: 1) AIRCRAFT FIRE/ RESCUE - LI 6027 - Fire Fighting Equipment Navy - 41.873 - - 8.907 - - UNCLASSIFIED Page 3 of 8 P-1 Line #121 Volume 5 - 49 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Fire Fighting Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2) BRUSH/STRUCTURAL 2.2) BSVE-7341-01TRUCK FIREFIGHTING BRUSH/GRASS 500 GPM A 664,384.62 13 8.637 689,005.00 4 2.756 702,785.00 4 2.811 716,840.00 3 2.151 - - - 716,840.00 3 2.151 1,256K 3 3.768 1,394K 1 1.394 1,422K 1 1.422 1,451K 1 1.451 - - - 1,451K 1 1.451 808,000.00 4 3.232 591,250.00 4 2.365 833,750.00 5 4.169 850,425.00 4 3.402 - - - 850,425.00 4 3.402 214,111.11 9 1.927 235,404.00 4 0.942 239,700.00 3 0.719 244,494.00 1 0.244 - - - 244,494.00 1 0.244 409,384.62 39 15.966 449,637.00 13 5.845 451,476.00 13 5.869 460,506.00 7 3.224 - - - 460,506.00 7 3.224 368,900.00 10 3.689 398,594.00 2 0.797 406,545.00 3 1.220 - - - - - - - - - 478,800.00 5 2.394 - - - - - - - - - - - - - - - (†) 2.3) BSVE-7400RH-TRUCK FIRE FIGHTING AERIAL 100 FT LADDER RIGHT HAND DRIVE A (†) 2.4) BSVE-7400-04TRUCK FIREFIGHTING AERIAL LADDER 75 A (†) FT 2.5) BSVE-7341-02TRUCK FIREFIGHTING BRUSH/GRASS WILDLAND 50 GPM A (†) 500 GALLON 2.6) BSVE-7321-01TRUCK FIREFIGHTING STRUCTURAL PUMPER 1250 GPM A (†) 2.7) BSVE-7225-01AGENT RESUPPLIER TRUCK/TRAILER MOUNTED WITH A (†) WATER SYSTEM 2.8) BSVE-7321RH-TRUCK FIREFIGHTING STRUCTURAL PUMPER 1250 GPMRHD A Subtotal: 2) BRUSH/STRUCTURAL - - 39.613 - - 14.099 - - 16.210 - - 10.472 - - - - - 10.472 3) Integrated Logistics Support (ILS) Costs - - 2.109 - - - - - 0.805 - - 0.109 - - - - - 0.109 Subtotal: 3) Integrated Logistics Support (ILS) Costs 3.1) ILS Costs A - - 2.109 - - - - - 0.805 - - 0.109 - - - - - 0.109 Total - - 83.595 - - 23.006 - - 27.675 - - 17.107 - - - - - 17.107 LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 4 of 8 P-1 Line #121 Volume 5 - 50 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment Aggregated Items Title: Fire Fighting Equipment Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) FY27 Quantity increase is due to greater high demand in meeting critical mission requirements. LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 5 of 8 P-1 Line #121 Volume 5 - 51 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Fire Fighting Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.2) BSVE-7160-00-TRUCK AIRCRAFT CRASH FIRE RESCUE 1000 GAL 2025 E-One, Inc DBA / Ocala, FL Reqn DLA Dec 2025 Dec 2026 2 915,552.00 Y 1.2) BSVE-7160-00-TRUCK AIRCRAFT CRASH FIRE RESCUE 1000 GAL 2026 E-One, Inc DBA / Ocala, FL Reqn DLA Aug 2026 Aug 2027 2 933,863.00 Y 1.2) BSVE-7160-00-TRUCK AIRCRAFT CRASH FIRE RESCUE 1000 GAL 2027 E-One, Inc DBA / Ocala, FL Reqn DLA Oct 2026 Oct 2026 1 952,540.00 N 1.3) BSVE-7102-02-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB 2 AGENT RIV 2025 E-One, Inc DBA / Ocala, FL MIPR DLA Sep 2025 Sep 2026 1 408,000.00 Y 1.3) BSVE-7102-02-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB 2 AGENT RIV 2026 E-One, Inc DBA / Ocala, FL MIPR DLA Aug 2026 Aug 2026 2 416,160.00 Y 1.4) BSVE-7601-MH-HAZARDOUS MATERIAL/EMERGENCY RESPONSE TRUCK MEDIUM 2025 KOVATCH / NESQUEHONING, PA MIPR DLA Jul 2025 Apr 2026 1 540,568.00 Y 1.5) BSVE-7601-SH-HAZARDOUS MATERIAL/EMERGENCY RESPONSE TRUCK SMALL 2026 KOVATCH / NESQUEHONING, PA Reqn DLA Jul 2026 Jul 2026 3 296,082.00 Y 1.6) BSVE-7160-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 1500 GALLON 2025 E-One, Inc DBA / Ocala, FL Reqn DLA Oct 2025 Oct 2025 2 659,736.00 Y 1.6) BSVE-7160-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 1500 GALLON 2026 E-One, Inc DBA / Ocala, FL Reqn DLA Aug 2026 Aug 2026 4 672,930.00 Y 1.6) BSVE-7160-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 1500 GALLON 2027 E-One, Inc DBA / Ocala, FL Reqn DLA Oct 2026 Oct 2026 3 686,388.00 N 1.7) BSVE-7190-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 3000 GALLON DRY CHEMICAL 2025 OSHKOSH / Oshkosh, WI Reqn DLA Sep 2025 Nov 2026 4 819,349.00 Y 1.7) BSVE-7190-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 3000 GALLON DRY CHEMICAL 2026 OSHKOSH / Oshkosh, WI Reqn DLA Aug 2026 Oct 2027 3 835,735.00 Y 1.7) BSVE-7190-01-TRUCK AIRCRAFT CRASH FIRE RESCUE 3000 GALLON DRY CHEMICAL 2027 OSHKOSH / Oshkosh, WI Reqn DLA Oct 2026 Oct 2026 3 852,449.00 N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) AIRCRAFT FIRE/RESCUE LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 6 of 8 P-1 Line #121 Volume 5 - 52 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Fire Fighting Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 Pierce Mfg, Inc / Appleton, WI Reqn DLA Sep 2025 Sep 2026 1 306,515.00 Y 2027 Pierce Mfg, Inc / Appleton, WI Reqn DLA Oct 2026 Oct 2026 3 318,898.00 N 1.9) BSVE-7102-03-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB ENHANCED 2025 E-One, Inc DBA / Ocala, FL Reqn DLA Sep 2025 Sep 2026 2 612,000.00 Y 1.9) BSVE-7102-03-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB ENHANCED 2026 E-One, Inc DBA / Ocala, FL Reqn DLA Aug 2026 Aug 2026 3 624,240.00 Y 2.2) BSVE-7341-01-TRUCK FIREFIGHTING BRUSH/GRASS 500 GPM 2025 Pierce Mfg, Inc / Appleton, WI Reqn DLA Sep 2025 Sep 2026 4 689,005.00 Y 2.2) BSVE-7341-01-TRUCK FIREFIGHTING BRUSH/GRASS 500 GPM 2026 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2026 Aug 2027 4 702,785.00 Y 2.2) BSVE-7341-01-TRUCK FIREFIGHTING BRUSH/GRASS 500 GPM 2027 Pierce Mfg, Inc / Appleton, WI C / TBD ** NO PCO ** Oct 2026 Oct 2026 3 716,840.00 N 2.3) BSVE-7400-RH-TRUCK FIRE FIGHTING AERIAL 100 FT LADDER RIGHT HAND DRIVE 2025 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2025 Aug 2026 1 1,394K Y 2.3) BSVE-7400-RH-TRUCK FIRE FIGHTING AERIAL 100 FT LADDER RIGHT HAND DRIVE 2026 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2026 Aug 2027 1 1,422K Y 2.3) BSVE-7400-RH-TRUCK FIRE FIGHTING AERIAL 100 FT LADDER RIGHT HAND DRIVE 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 1,451K N 2.4) BSVE-7400-04-TRUCK FIREFIGHTING AERIAL LADDER 75 FT 2025 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2025 Aug 2026 4 591,250.00 Y 2.4) BSVE-7400-04-TRUCK FIREFIGHTING AERIAL LADDER 75 FT 2026 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2026 Aug 2027 5 833,750.00 Y 2.4) BSVE-7400-04-TRUCK FIREFIGHTING AERIAL LADDER 75 FT 2027 Pierce Mfg, Inc / Appleton, WI C / TBD ** NO PCO ** Oct 2026 Oct 2026 4 850,425.00 N Item Number / Title [DODIC] 1.8) BSVE-7102-01-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB 1.8) BSVE-7102-01-TRUCK AIRCRAFT RESCUE FIREFIGHTING CREW CAB O O C P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment (1) (1) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) BRUSH/STRUCTURAL LI 6027 - Fire Fighting Equipment Navy UNCLASSIFIED Page 7 of 8 P-1 Line #121 Volume 5 - 53 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Fire Fighting Equipment FY Contractor and Location Method/Type or Funding Vehicle 2.5) BSVE-7341-02-TRUCK FIREFIGHTING BRUSH/GRASS WILDLAND 50 GPM 500 GALLON 2025 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2025 Aug 2026 4 235,404.00 Y 2.5) BSVE-7341-02-TRUCK FIREFIGHTING BRUSH/GRASS WILDLAND 50 GPM 500 GALLON 2026 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2026 Aug 2027 3 239,700.00 Y 2.5) BSVE-7341-02-TRUCK FIREFIGHTING BRUSH/GRASS WILDLAND 50 GPM 500 GALLON 2027 Pierce Mfg, Inc / Appleton, WI Reqn DLA Oct 2026 Oct 2026 1 244,494.00 N 2.6) BSVE-7321-01-TRUCK FIREFIGHTING STRUCTURAL PUMPER 1250 GPM 2025 OSHKOSH / Oshkosh, WI Reqn DLA Sep 2025 Sep 2026 13 449,637.00 Y 2.6) BSVE-7321-01-TRUCK FIREFIGHTING STRUCTURAL PUMPER 1250 GPM 2026 Pierce Mfg, Inc / Appleton, WI Reqn DLA Aug 2026 Jul 2027 13 451,476.00 Y 2.6) BSVE-7321-01-TRUCK FIREFIGHTING STRUCTURAL PUMPER 1250 GPM 2027 Pierce Mfg, Inc / Appleton, WI Reqn DLA Oct 2026 Oct 2026 7 460,506.00 N 2.7) BSVE-7225-01-AGENT RESUPPLIER TRUCK/TRAILER MOUNTED WITH WATER SYSTEM 2025 ROSENBAUER AMERICA LLC / LYONS, SD Reqn DLA Sep 2025 Sep 2026 2 398,594.00 Y 2.7) BSVE-7225-01-AGENT RESUPPLIER TRUCK/TRAILER MOUNTED WITH WATER SYSTEM 2026 ROSENBAUER AMERICA LLC / LYONS, SD Reqn DLA Aug 2026 Aug 2027 3 406,545.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6027 / Fire Fighting Equipment LI 6027 - Fire Fighting Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 8 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #121 RFP Issue Date Volume 5 - 54 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6028 / Tactical Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 111.549 111.549 111.549 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 36.355 37.262 46.796 0.000 46.796 39.258 45.288 46.574 - - - - - - - - 36.355 37.262 46.796 0.000 46.796 39.258 45.288 46.574 - - - - - - - - 36.355 37.262 46.796 0.000 46.796 39.258 45.288 46.574 To FY 2031 Complete 52.216 Continuing - Continuing - 52.216 Continuing - Total - Continuing - - 52.216 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.538 0.260 5.159 - 5.159 11.800 - - - - 17.757 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line procures essential light and medium tactical vehicles to enhance the Navy Expeditionary Force's operational capabilities across a range of critical missions. These vehicles directly support Operational Plans, Partner Nations, and key Naval and Joint Force strategic initiatives, including Distributed Maritime Operations, Expeditionary Advanced Base Operations, and Pacific Posture initiatives. This investment bolsters the Navy's ability to operate in contested environments and provide Humanitarian Assistance & Disaster Relief (HADR) to allies and partners. Specifically, this procurement funds the following vehicles and their associated mission capabilities: - Medium Service Support Vehicle (MSSV): Enables Explosive Ordnance Disposal (EOD) forces to transport personnel and equipment necessary to execute Expeditionary Mine Counter Measures (ExMCM) missions. - Light Service Support Vehicle (LSSV): Provides the Navy Expeditionary Combat Force (NECF) with the mobility / hauling capacity required for transporting gear and equipment required to support Expeditionary Vertical Launch System (VLS) reloads, airfield and port damage repair, and maritime security operations. - Medium Tactical Vehicle Replacement (MTVR): Supports the movement of ordnance and heavy equipment for VLS reloads, air asset resupply and rearmament, and Maritime Prepositioning Force (MPF) on/ offload operations. - Ultra-Light Tactical Vehicle (ULTV): Equips Naval Special Warfare (NSW) units with the agility needed for forward operations supporting Marine Corps Forces and Expeditionary Advanced Base Operations. - Joint Light Tactical Vehicle (JLTV) & High Mobility Multipurpose Wheeled Vehicle (HMMWV): Provide critical force protection and personnel transport capabilities for the Navy Expeditionary Force, enhancing security during convoy operations and in high-threat environments. This investment in tactical vehicles is crucial for maintaining the Navy Expeditionary Force's readiness and ability to project power and provide critical support across the full spectrum of naval operations. The procurement of HMMWVs in this budget line also supports the guarding and protection of the TRIDENT II (D5LE) missile while the missile stored, handled, or in a movement to and from the waterfront. These armored HMMWVs support security forces to deter, delay, and defeat unauthorized shore access to nuclear weapons at Strategic Weapons Facilities. Vehicles are procured to replace existing vehicles used in security patrols and missile movement convoys; replacement is based on meeting or exceeded service life due to age and usage. [P40A / Expeditionary Light Tactical All-Terrain Vehicle]: Funding provided for Light Tactical All-Terrain Vehicles. These vehicles provide Expeditionary teams with a highly maneuverable and mobile form of transportation that is also low profile and easily transportable. The procurement of this platform for the Navy Special Warfare units provides commonality with Marine Corps enhancing interoperability across services. LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 1 of 8 P-1 Line #122 Volume 5 - 55 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6028 / Tactical Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Expeditionary MTVR - SLEP]: Funds provided for Medium Tactical Vehicle Replacement (MTVRs) Service Life Extension Program (SLEP). MTVR service life expectancy has increased from 21 to 42 years making it necessary to perform midlife overhauls and SLEPs actions to extend performance for the life of the vehicles. [P40A / Expeditionary-GFE Integration and Installation]: GFE Integration and Installation provides for the integration of communications and other electronic gear to the commercial platforms being procured, yielding a fully integrated system. [P40A / Expeditionary-Acquisition Support]: Acquisition support provides for government execution and oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (CDRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the procurement and delivery of equipment. LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 2 of 8 P-1 Line #122 Volume 5 - 56 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6028 / Tactical Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Tactical Vehicles P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 111.549 - / 36.355 - / 37.262 - / 46.796 - / 111.549 - / 36.355 - / 37.262 - / 46.796 - / - - / 46.796 / 0.000 - / 46.796 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports: - Light Service Support Vehicle (LSSV) procurement to outfit the newly activated Navy Cargo Handling Battalion to meet Vertical Launch System (VLS) reload Operational Plan capacity requirements and the Expeditionary Medical Facility (EMF) Table of Allowance (TOA) for forward deployed and rotational units across all Combatant Commands. - Joint Light Tactical Vehicle (JLTV) procurement to support combat mission requirements for the readiness and battlefield effectiveness of Navy Special Warfare (NSW) units. The JLTV is essential in meeting force protection requirements in high threat environments. - High Mobility Multipurpose Wheeled Vehicle (HMMWV) procurement to support troop movement in operational environments and nuclear weapons security. -MTVR Service Life Extension Program - Since the Medium Tactical Truck as a replacement has been cancelled as a program, the MTVR is going to be in service longer than anticipated yielding a need for SLEP to extend the life. - Command, Control, Communications, Computers Intelligence, Surveillance, and Reconnaissance (C4ISR), Common Remotely Operated Weapons (CROW), and crew-served weapon vehicle integration kit procurement for multiple tactical vehicle platforms, ensuring the force has a common C4ISR solution and common weapon system integration solutions. LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 3 of 8 P-1 Line #122 Volume 5 - 57 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6028 / Tactical Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Tactical Vehicles Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Expeditionary Light Tactical Vehicles 1.1) ExpeditionaryJLTV Heavy Gun A - - - 55,205.94 471 26.002 81,709.68 31 2.533 175,632.65 49 8.606 216,666.67 6 1.300 220,000.00 248,750.00 8 234,166.67 6 (†) Carriers (HGC)s 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS - 651,190.48 6 3.907 89,847.43 35 3.145 97,191.89 73 7.095 85,680.00 10 0.857 105,922.08 22 - - - - - - 98,861.08 65 6.426 - - - 2.330 108,040.53 73 7.887 - - 107 22.563 - - - - 98,861.08 65 6.426 - 108,040.53 73 7.887 - - 210,869.57 107 22.563 (†) A (1)(†) 1.4) Expeditionary LSSV TRUCK LITTER CARRIER 4X4 TWO 1.5) Expeditionary LSSV Cargo Crew with EMP Protection A (†) 1.6) Expeditionary HMMWV M1151A1 WITH A-KITS A A (†) 1.7) Expeditionary HMMWV M1165A1 W A (3)(†) 1.8) Expeditionary Light Tactical AllTerrain Vehicle - - - - - - 210,869.57 6 1.320 - - - - - - - - - - - - 1.990 357,000.00 9 3.213 - - - - - - - - - - - - 1.405 220,000.00 3 0.660 230,010.67 3 0.690 243,000.33 4 0.972 - - - 243,000.33 4 0.972 8 0.946 120,600.40 3 0.362 123,100.00 4 0.492 - - - 123,100.00 4 0.492 (2)(†) DOOR DIESEL VIK - A 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 - A - - - - - 41.836 107,641.98 81 351,322.58 (4)(†) Subtotal: 1) Expeditionary Light Tactical Vehicles 118,300.00 - - 10.141 - - 14.384 - - 38.340 - - - - - 38.340 8.719 106,000.00 49 5.194 - - - - - - - - - - - - 31 10.891 462,655.17 27 12.492 416,666.67 30 12.500 433,086.96 1.732 - - - - - 19.610 - - 17.686 - - 12.500 - - 1.732 - - - - - 1.732 - - 3.050 - - 1.261 - - 2.869 - - 1.105 - - - - - 1.105 - - 3.050 - - 1.261 - - 2.869 - - 1.105 - - - - - 1.105 2) Medium Trucks 2.1) Expeditionary Medium Service Support Vehicle A (†) 2.2) Expeditionary A (†) MTVR - SLEP Subtotal: 2) Medium Trucks 4 433,086.96 4 1.732 3) Integrated Logistics Support (ILS) Costs 3.1) Expeditionary ILS for Tactical vehicles (5) A Subtotal: 3) Integrated Logistics Support (ILS) Costs LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 4 of 8 P-1 Line #122 Volume 5 - 58 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6028 / Tactical Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Tactical Vehicles Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 4) Force Protection 4.1) ExpeditionaryGFE Integration and A (†) Installation 4.2) Expeditionary - Ready to Accept Armor (RTAA) modifications A 4.3) Expeditionary Mods to integrate comms equipment (RESERVE FORCES) A 4.4) Expeditionary MRAP ECP A 105,306.12 Subtotal: 4) Force Protection 49 5.160 - - 11.946 - - - 82,745.76 53 4.386 84,401.00 46 3.882 158,545.45 11 1.744 - - - - - - - - - - - - - - - 1.938 - - - - - - - - - - - - 12.514 - - - - - - - - - - - - 31.558 - - 4.386 - - 3.882 - - 1.744 - - 9.288 - - 1.346 - - 2.046 - - - - 9.288 - - 1.346 - - 2.046 - - 23 6.207 307,000.00 158,545.45 11 1.744 - - - - - - - - - - - - - - - - - 1.744 2.379 - - - - - 2.379 2.379 - - - - - 2.379 1.496 - - - 5) Acquisition Support 5.1) ExpeditionaryAcquisition Support (6) A Subtotal: 5) Acquisition Support 6) SSP Expeditionary Light Tactical Vehicles 6.1) TRUCK, UPARMORED HMMWV, 4X4 A (7)(†) 269,869.57 5 1.535 316,200.00 5 1.581 299,200.00 5 299,200.00 5 1.496 Subtotal: 6) SSP Expeditionary Light Tactical Vehicles - - 6.207 - - 1.535 - - 1.581 - - 1.496 - - - - - 1.496 Total - - 111.549 - - 36.355 - - 37.262 - - 46.796 - - - - - 46.796 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Increase from FY26 to FY27 is based on Fleet priorities balanced with acquisition approach and funds available. Requirement supports Navy Expeditionary units with gap to fulfill the requirements. Other units are recapitalizing LSSVs due to significant over age fleet of vehicles. (2) Increase from FY26 to FY27 is based on Fleet priorities balanced with acquisition approach and funds available. Requirement supports Navy Expeditionary units with gap to fulfill the requirements. Other units are recapitalizing LSSVs due to significant over age fleet of vehicles. (3) (4) (5) (6) Cost increased due to higher unit prices driven by inflation, increase raw material costs, and continued supply chain disruptions. Cost increased due to higher unit prices driven by inflation, increase raw material costs, and continued supply chain disruptions. FY27 decrease due to initial implementation of the Family of Buy Aquisition Strategy. Strategy decreases number of configurations being procured yielding less logistic support requirement. Acquisition support costs reflects government execution and oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (CDRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the procurement and delivery of equipment. (7) FY 2027 decrease due to miscellaneous rate adjustments and efficiencies gained with the vehicle manufacturer. LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 5 of 8 P-1 Line #122 Volume 5 - 59 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Tactical Vehicles FY Contractor and Location Method/Type or Funding Vehicle 1.1) Expeditionary-JLTV Heavy Gun Carriers (HGC)s 2026 AM General / South Bend, IN MIPR DLA Jan 2026 Jul 2027 6 651,190.48 Y 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS 2023 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2022 Jan 2023 19 58,556.00 Y 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS 2024 GSA Federal Supply / Norfolk, VA MIPR GSA Mar 2024 Jun 2024 57 65,555.56 Y 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS 2025 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2024 Jan 2025 35 89,847.43 Y 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS 2026 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2025 Jan 2026 73 97,191.89 N 1.2) Expeditionary LSSV CARGO CREWCAB 4X4 TROOP SEATS 2027 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2026 Jan 2027 65 98,861.08 Y 2023 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2022 Feb 2023 11 83,302.00 Y 2024 GSA Federal Supply / Norfolk, VA MIPR GSA Mar 2024 Jul 2024 8 88,500.00 Y 2025 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2024 Feb 2025 10 85,680.00 Y 2026 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2025 Feb 2026 22 105,922.08 N 2027 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2026 Feb 2027 73 108,040.53 Y 2023 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2022 Feb 2023 16 191,141.00 Y 2024 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2023 Feb 2024 3 198,786.00 Y 2027 GSA Federal Supply / Norfolk, VA MIPR GSA Oct 2026 Feb 2027 107 210,869.57 Y 2024 Ford Motor Company / Dearborn, MI MIPR GSA Feb 2024 Feb 2024 6 216,666.67 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6028 / Tactical Vehicles Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Expeditionary Light Tactical Vehicles 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 (1) 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 (1) 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 (1) 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 (1) 1.3) Expeditionary LSSV MAINTENANCE UTILITY CREWCAB 4X4 (1) 1.4) Expeditionary LSSV TRUCK LITTER CARRIER 4X4 TWO DOOR DIESEL (2) 1.4) Expeditionary LSSV TRUCK LITTER CARRIER 4X4 TWO DOOR DIESEL (2) 1.4) Expeditionary LSSV TRUCK LITTER CARRIER 4X4 TWO DOOR DIESEL (2) 1.5) Expeditionary LSSV Cargo Crew with EMP Protection LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 6 of 8 P-1 Line #122 Oct 2025 Oct 2025 Volume 5 - 60 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Tactical Vehicles FY Contractor and Location Method/Type or Funding Vehicle 1.5) Expeditionary LSSV Cargo Crew with EMP Protection 2025 Ford Motor Company / Dearborn, MI MIPR GSA Oct 2024 Oct 2024 6 220,000.00 Y 1.6) Expeditionary HMMWV M1151A1 WITH A-KITS 2025 AM General / South Bend, IN C / FFP US Army Contracting Command, Detroit MI Dec 2024 Jun 2025 9 357,000.00 Y 2024 AM General / South Bend, IN MIPR US Army Contracting Command, Detroit MI Jun 2024 Jun 2024 3 229,333.33 Y 2025 AM General / South Bend, IN MIPR US Army Contracting Command, Detroit MI Jun 2025 Jun 2025 3 220,000.00 Y 2026 AM General / South Bend, IN MIPR US Army Contracting Command, Detroit MI Oct 2025 Oct 2025 3 230,010.67 N Oct 2025 AM General / South Bend, IN MIPR US Army Contracting Command, Detroit MI Oct 2026 Apr 2028 4 243,000.33 N Oct 2025 2025 Polaris / Osceola, WI MIPR DLA Jun 2025 Jun 2026 8 118,300.00 N Jan 2025 2026 TBD / TBD C / TBD TBD Aug 2026 Aug 2027 3 120,600.40 N Aug 2025 2027 TBD / TBD C / TBD TBD Oct 2026 Oct 2027 4 123,100.00 N Oct 2025 2.1) Expeditionary Medium Service Support Vehicle 2024 GSA / GSA MIPR Port Hueneme, CA Oct 2023 Aug 2024 33 103,939.39 Y 2.1) Expeditionary Medium Service Support Vehicle 2025 GSA / GSA MIPR Port Hueneme, CA Oct 2024 Aug 2025 49 106,000.00 Y 2024 USMC Depot Maintenance Command, Barstow / Barstow, CA MIPR Port Hueneme, CA May 2024 May 2025 15 443,200.00 Y 2025 USMC Depot Maintenance Command, Barstow / Barstow, CA MIPR Port Hueneme, CA Oct 2024 Oct 2025 27 462,655.17 Y 2026 USMC Depot Maintenance Command, Barstow / Barstow, CA MIPR Port Hueneme, CA Oct 2025 Oct 2026 30 416,666.67 N Oct 2025 USMC Depot Maintenance Command, Barstow / Barstow, CA MIPR Port Hueneme, CA Oct 2026 Oct 2027 4 433,086.96 N Oct 2025 Item Number / Title [DODIC] 1.7) Expeditionary HMMWV M1165A1 W VIK (3) 1.7) Expeditionary HMMWV M1165A1 W VIK (3) 1.7) Expeditionary HMMWV M1165A1 W VIK (3) 1.7) Expeditionary HMMWV M1165A1 W VIK (3) 1.8) Expeditionary Light Tactical All-Terrain Vehicle (4) 1.8) Expeditionary Light Tactical All-Terrain Vehicle (4) 1.8) Expeditionary Light Tactical All-Terrain Vehicle (4) O O C P-1 Line Item Number / Title: 6028 / Tactical Vehicles 2027 (8) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) Medium Trucks 2.2) Expeditionary MTVR - SLEP 2.2) Expeditionary MTVR - SLEP 2.2) Expeditionary MTVR - SLEP 2.2) Expeditionary MTVR - SLEP 2027 (9) 4) Force Protection 4.1) Expeditionary-GFE Integration and Installation 2024 SAIC / Reston, VA MIPR NIWC-LANT Oct 2024 Apr 2025 49 105,306.12 Y 4.1) Expeditionary-GFE Integration and Installation 2025 SAIC / Reston, VA MIPR NIWC-LANT May 2025 Nov 2025 53 82,745.76 Y 4.1) Expeditionary-GFE Integration and Installation 2026 SAIC / Reston, VA MIPR NIWC-LANT Mar 2026 Sep 2026 46 84,401.00 N LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 7 of 8 P-1 Line #122 Oct 2025 Volume 5 - 61 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 4.1) Expeditionary-GFE Integration and Installation O O C P-1 Line Item Number / Title: 6028 / Tactical Vehicles Aggregated Items: Tactical Vehicles FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2027 SAIC / Reston, VA MIPR NIWC-LANT Mar 2027 Sep 2027 11 158,545.45 N 2024 GSA / GSA MIPR GSA Apr 2024 Jan 2025 5 301,000.00 Y 2025 GSA / GSA MIPR GSA Feb 2025 Nov 2025 5 307,000.00 Y 2026 GSA / GSA MIPR GSA Apr 2026 Jan 2027 5 316,200.00 Y GSA / GSA MIPR GSA Feb 2027 Nov 2027 5 299,200.00 N Qty (Each) RFP Issue Date Oct 2025 6) SSP Expeditionary Light Tactical Vehicles 6.1) TRUCK, UP-ARMORED HMMWV, 4X4 (7) 6.1) TRUCK, UP-ARMORED HMMWV, 4X4 (7) 6.1) TRUCK, UP-ARMORED HMMWV, 4X4 (7) 6.1) TRUCK, UP-ARMORED HMMWV, 4X4 (7) 2027 (10) Oct 2027 Footnotes: (8) The standard time for delivery of the base vehicle is 6 to 8 months and after production the vehicles are sent for comms integration which adds an additional year before fielding and receipt at the unit. Backlog for integration primarily driven by all the communication and electronic pieces and parts for GFE integration having long lead times (9) This is the normal historic timeline for SLEPs. These trucks require a complete stripped down to basic chassis and extensive rebuilt from that level up. (10) These trucks require a complete strip down to basic chassis and extensive rebuilt from that level up. LI 6028 - Tactical Vehicles Navy UNCLASSIFIED Page 8 of 8 P-1 Line #122 Volume 5 - 62 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6033 / Amphibious Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 4.501 6.454 38.073 53.916 0.000 53.916 39.244 39.252 39.970 40.898 - - - - - - - - - - - - 4.501 6.454 38.073 53.916 0.000 53.916 39.244 39.252 39.970 40.898 - Total 262.308 262.308 - - - - - - - - - - - 4.501 6.454 38.073 53.916 0.000 53.916 39.244 39.252 39.970 40.898 - 262.308 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.428 - - - - - - - - - 0.428 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item funds the procurement of equipment to support Navy-Marine Corps amphibious operations, Logistics Over the Shore, and Joint Logistics Over the Shore operations. This provides the ability to execute the ship to shore transfer of vehicles, dry cargo, and liquid cargo, delivered over bare beaches, as well as through improved and semi-improved port facilities. [P5 / Joint Petroleum Over the Shore (JPOTS) Family of Systems (FoS)]: The Joint Petroleum Over The Shore (JPOTS) Family of Systems (FoS) will enable delivery of fuel to the high-water mark in support of Joint operations inside the weapons engagement zone. [P5 / Seabased Petroleum Distribution System (SPDS)]: Funds provided for Joint Petroleum Over the Shore (JPOTS) capability set in support of Distributed Maritime Operations (DMO), Expeditionary Advanced Base Operations (EABO) and Maritime Prepositioning Force (MPF) operations as well as other ground forces ashore. [P5 / Unmanned Aerial System (UAS)]: Funds initial procurement and phased sustainment of UAS assets, additional Littoral Imaging System (LIS) Unmanned Aerial System (UAS) assets and their associated sustainment support. Enables on-demand littoral reconnaissance data without putting Sailors/vessels in the water to determine safe sea lane passage during operations. LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 1 of 8 P-1 Line #123 Volume 5 - 63 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6033 / Amphibious Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Amphibious Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 4.501 - / 6.454 - / 38.073 - / 53.916 - / 0.000 - / 53.916 - / 4.501 - / 6.454 - / 38.073 - / 53.916 - / 0.000 - / 53.916 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding increase of $15.843M from FY26 to FY27 Supports: The increase in OPN funding transitions multiple new Joint Petroleum Over the Shore (JPOTS) Family of Systems (FoS) capabilities to production, procuring the initial units for the Distributed Littoral Operations Fuel Transfer System (DLOFTS), Amphibious Bulk Liquid Transfer System-JPOTS (ABLTS-J), and Reach From The Beach (RFTB) system. This increase also initiates the Towable Fuel Systems (TFS) program. The overall funding line continues to support the ongoing production of the Seabased Petroleum Distribution System (SPDS). LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 2 of 8 P-1 Line #123 Volume 5 - 64 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 6033 / Amphibious Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Amphibious Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 4.501 6.454 38.073 53.916 0.000 53.916 - - - - - - 4.501 6.454 38.073 53.916 0.000 53.916 - - - - - - 4.501 6.454 38.073 53.916 0.000 53.916 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.428 - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Joint Petroleum Over the Shore (JPOTS) Family of Systems (FoS) Cost Non Recurring Cost 1.1.1) Seabased Petroleum Distribution System (SPDS) (†) (1) 1.1.2) Distributed Littoral Operations Fuel Transfer System - - 4.501 - - 6.454 36,690K - - - - - - - - - - - - - - - - - - 1 36.690 41,507K 1 41.507 - - - 41,507K 1 41.507 - - 2,050K 2 4.100 - - - 2,050K 2 4.100 - - - 1,500K 3 4.500 - - - 1,500K 3 4.500 - - - - 600,000.00 5 3.000 - - - 600,000.00 5 3.000 809,000.00 1 0.809 - - - 809,000.00 1 0.809 (†) (2) (DLOFTS) 1.1.3) Amphibious Bulk Liquid Transfer System - JPOTS (ABLTS-J) (†) (3) 1.1.4) Reach From The Beach (RFTB) (†) (4) 1.1.5) Towed Fuel - - - - - - - - - Subtotal: Non Recurring Cost - - 4.501 - - 6.454 - - 36.690 - - 53.916 - - - - - 53.916 Subtotal: Hardware - Joint Petroleum Over the Shore (JPOTS) Family of Systems (FoS) Cost - - 4.501 - - 6.454 - - 36.690 - - 53.916 - - - - - 53.916 (†) (5) System (TFS) Hardware - Littoral Imaging Systems Cost Recurring Cost LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 3 of 8 P-1 Line #123 Volume 5 - 65 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 6033 / Amphibious Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Amphibious Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements 2.1.1) Unmanned Aerial System (UAS) ($) (†) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) - - - - - - FY 2027 Base Total Cost Qty (Each) ($ M) 691,500.00 2 Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.383 - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - 1.383 - - - - - - - - - Subtotal: Hardware - Littoral Imaging Systems Cost - - - - - - - - 1.383 - - - - - - - - - Gross/Weapon System Cost - - 4.501 - - 6.454 - - 38.073 - - 53.916 - - 0.000 - - 53.916 (†) indicates the presence of a P-5a Footnotes: (1) (2) FY27 cost increase due to inflation of raw material Funding will enable the replacement of the Offshore Petroleum Discharge System (OPDS) and fulfill a range of requirements and deployment options for the transfer of petroleum from sea-based sources to the shore at the high water mark in support of Joint Operations (3) Funding will enable the replacement of the Offshore Petroleum Discharge System (OPDS) and fulfill a range of requirements and deployment options for the transfer of petroleum from sea-based sources to the shore at the high water mark in support of Joint Operations (4) Funding will enable the replacement of the Offshore Petroleum Discharge System (OPDS) and fulfill a range of requirements and deployment options for the transfer of petroleum from sea-based sources to the shore at the high water mark in support of Joint Operations (5) Funding will enable the replacement of the Offshore Petroleum Discharge System (OPDS) and fulfill a range of requirements and deployment options for the transfer of petroleum from sea-based sources to the shore at the high water mark in support of Joint Operations LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 4 of 8 P-1 Line #123 Volume 5 - 66 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 O O C Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Amphibious Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2026 BlackSea Headquarters / Fort Lauderdale, FL C / FFP ACC-ORL Apr 2026 Oct 2027 1 36,690K Y 1.1.1) Seabased Petroleum Distribution System (SPDS) 2027 BlackSea Headquarters / Fort Lauderdale, FL C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 41,507K Y 1.1.2) Distributed Littoral Operations Fuel Transfer System (DLOFTS) 2027 Unknown / Unknown C / TBD ** NO PCO ** Mar 2027 Nov 2028 2 2,050K Y 1.1.3) Amphibious Bulk Liquid Transfer System - JPOTS (ABLTSJ) 2027 Unknown / Unknown C / TBD ** NO PCO ** Mar 2027 Aug 2028 3 1,500K Y 1.1.4) Reach From The Beach (RFTB) 2027 Unknown / Unknown C / TBD ** NO PCO ** Oct 2026 Mar 2027 5 600,000.00 Y 1.1.5) Towed Fuel System (TFS) 2027 Unknown / Unknown C / TBD ** NO PCO ** Mar 2027 Mar 2028 1 809,000.00 Y 2.1.1) Unmanned Aerial System (UAS) 2026 New MFG - Name / New MFG - Loc C / TBD TBD Apr 2026 Apr 2026 2 691,500.00 N 1.1.1) Seabased Petroleum Distribution System (SPDS) (†) P-1 Line Item Number / Title: 6033 / Amphibious Equipment (†) (Each) Apr 2025 RFP Issue Date Jul 2025 Oct 2025 indicates the presence of a P-21 LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 5 of 8 P-1 Line #123 Volume 5 - 67 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 6033 / Amphibious Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.1) Seabased Petroleum Distribution System (SPDS) 1 2026 NAVY 1 Item Number / Title [DODIC]: 1 / Amphibious Equipment 0 LI 6033 - Amphibious Equipment Navy Calendar Year 2026 O C T N O V D E C J A N F E B M A R O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 A A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #123 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 68 1 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 6033 / Amphibious Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 1.1.1) Seabased Petroleum Distribution System (SPDS) 1 2026 NAVY 1 Item Number / Title [DODIC]: 1 / Amphibious Equipment 0 Calendar Year 2028 O C T Calendar Year 2029 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 1 O C T LI 6033 - Amphibious Equipment Navy Fiscal Year 2029 0 UNCLASSIFIED Page 7 of 8 P-1 Line #123 Volume 5 - 69 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 P-1 Line Item Number / Title: 6033 / Amphibious Equipment Item Number / Title [DODIC]: 1 / Amphibious Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 BlackSea Headquarters Fort Lauderdale, FL 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6033 - Amphibious Equipment Navy UNCLASSIFIED Page 8 of 8 P-1 Line #123 Volume 5 - 70 0 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6058 / Pollution Control Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 24.159 3.924 4.009 3.586 0.000 3.586 3.803 3.865 3.941 - - - - - - - - - 24.159 3.924 4.009 3.586 0.000 3.586 3.803 3.865 3.941 - - - - - - - - - 24.159 3.924 4.009 3.586 0.000 3.586 3.803 3.865 3.941 To FY 2031 Complete 4.021 Continuing - Continuing - 4.021 Continuing - Total - Continuing - - 4.021 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Navy Ashore Pollution Control Equipment program funds hazardous substance spill containment and recovery systems. Funding requirements for the Navy's oil spill program include procurement of oil spill containment booms and related deployment equipment. After initial containment with boom, shore activities can efficiently collect spilled oil with vacuum trucks. This equipment will enable the Navy to meet the requirements established by the U.S. Environmental Protection Agency (EPA) in the National Contingency Plan which requires rapid and effective response to oil spills. The revised National Spill Contingency Plan mandates that the DoW and the Navy assume responsibility for their own oil and hazardous substance spills. These broad responsibilities require the Navy to maintain sufficient spill response equipment for the Navy activities worldwide, such as oil spill containment systems and recovery systems. The severe oil spills in Alaska, California and the Gulf of Mexico have increased the public's sensitivity to releases of oil into the environment. LI 6058 - Pollution Control Equipment Navy UNCLASSIFIED Page 1 of 4 P-1 Line #124 Volume 5 - 71 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6058 / Pollution Control Equipment Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Pollution Control Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 24.159 - / 3.924 - / 4.009 - / 3.586 - / 24.159 - / 3.924 - / 4.009 - / 3.586 - / - - / 3.586 / 0.000 - / 3.586 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Additional procurement of shore-based oil spill response equipment in FY27 is required in order to improve mission readiness at Naval Installations. Without additional procurement, there will be increased maintenance costs to extend equipment service life and readiness which is impacted during increased maintenance cycle times. LI 6058 - Pollution Control Equipment Navy UNCLASSIFIED Page 2 of 4 P-1 Line #124 Volume 5 - 72 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6058 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Pollution Control Equipment ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) POLLUTION CONTROL EQUIPMENT 1.1) RESPONSE BOOM (†) 1.2) PERMANENT BOOM (1)(†) 1.3) BOOM SUPPORT A A A (†) EQUIPMENT 1.4) VACUUM TRUCK (2)(†) A 12,483.08 857 10.698 17,656.20 109 1.925 17,947.67 109 1.956 18,444.18 50 0.922 - - - 18,444.18 50 0.922 22,533.57 283 6.377 36,006.00 23 0.828 36,600.38 23 0.842 36,888.36 41 1.512 - - - 36,888.36 41 1.512 18,595.51 178 3.310 20,604.00 26 0.536 20,944.13 27 0.565 20,718.03 17 0.352 - - - 20,718.03 17 0.352 114,363.64 33 3.774 158,768.44 4 0.635 161,389.38 4 0.646 199,929.32 4 0.800 - - - 199,929.32 4 0.800 Subtotal: 1) POLLUTION CONTROL EQUIPMENT - - 24.159 - - 3.924 - - 4.009 - - 3.586 - - - - - 3.586 Total - - 24.159 - - 3.924 - - 4.009 - - 3.586 - - - - - 3.586 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) FY27 quantities increased due to replacing end of life equipment FY27 cost increase due to inflation of raw material LI 6058 - Pollution Control Equipment Navy UNCLASSIFIED Page 3 of 4 P-1 Line #124 Volume 5 - 73 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Pollution Control Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1) RESPONSE BOOM 2024 Oil Stop / APC Harvey, LA C / FP EXWC May 2024 Jul 2024 83 17,391.57 Y 1.1) RESPONSE BOOM 2025 Elastic, Inc. / Carmi, IL C / FP EXWC Mar 2025 May 2025 109 17,656.20 Y 1.1) RESPONSE BOOM 2026 Elastic, Inc. / Carmi, IL C / FP EXWC Mar 2026 May 2026 109 17,947.67 Y 1.1) RESPONSE BOOM 2027 TBD / TBD C / FP EXWC Mar 2027 May 2027 50 18,444.18 N 2024 Parker Systems Inc. / Cheasapeake, VA C / FP EXWC May 2024 Jul 2024 20 35,466.34 Y 2025 Parker Systems Inc. / Cheasapeake, VA C / FP EXWC Mar 2025 May 2025 23 36,006.00 Y 2026 Parker Systems Inc. / Cheasapeake, VA C / FP EXWC Mar 2026 May 2026 23 36,600.38 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6058 / Pollution Control Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) POLLUTION CONTROL EQUIPMENT 1.2) PERMANENT BOOM (1) 1.2) PERMANENT BOOM (1) 1.2) PERMANENT BOOM (1) 1.2) PERMANENT BOOM (1) 2027 TBD / TBD C / FP EXWC Mar 2027 May 2027 41 36,888.36 N 1.3) BOOM SUPPORT EQUIPMENT 2024 Elastic, Inc. / Carmi, IL C / FP EXWC May 2024 Jul 2024 15 20,295.19 Y 1.3) BOOM SUPPORT EQUIPMENT 2025 Elastic, Inc. / Carmi, IL C / FP EXWC Mar 2025 May 2025 26 20,604.00 Y 1.3) BOOM SUPPORT EQUIPMENT 2026 Elastic, Inc. / Carmi, IL C / FP EXWC Mar 2026 May 2026 27 20,944.13 Y 2027 TBD / TBD C / FP EXWC Mar 2027 Mar 2027 17 20,718.03 N 2024 Skymark Refuelers, LLC / Kansas City, KS C / FP GSA May 2024 Jan 2025 1 191,789.58 Y Y 1.3) BOOM SUPPORT EQUIPMENT 1.4) VACUUM TRUCK (2) 1.4) VACUUM TRUCK (2) 2025 GARSITE / Kansas City, KS C / FP GSA Mar 2025 Nov 2025 4 158,768.44 1.4) VACUUM TRUCK (2) 2026 GARSITE / Kansas City, KS C / FP GSA Mar 2026 Nov 2026 4 161,389.38 Y 1.4) VACUUM TRUCK (2) 2027 TBD / TBD C / FP GSA Mar 2027 Mar 2027 4 199,929.32 N LI 6058 - Pollution Control Equipment Navy UNCLASSIFIED Page 4 of 4 P-1 Line #124 Volume 5 - 74 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6060 / Items less than $5 Million Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 233.643 233.643 233.643 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 103.014 103.014 103.014 127.086 127.086 127.086 131.449 - 0.000 - 131.449 - 0.000 - 131.449 0.000 131.449 131.449 131.449 130.457 130.457 130.457 109.592 109.592 109.592 106.864 106.864 - To FY 2031 Complete 112.442 Continuing 112.442 Total - Continuing Continuing - Continuing - - 106.864 112.442 Continuing Continuing 0.007 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.072 0.508 3.483 - 3.483 2.120 0.840 0.008 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: SPECIAL PURPOSE VEHICLES/EQUIPMENT (BSO 52) This budget line includes procurement of specialized equipment used for repair, rearming, and resupplying operations at both Shore Installations and Advanced Naval Bases that support execution of home station training, Operational Plan (OPLAN) response, and support to Partner Nations. This equipment which is used by the Naval Construction Force, Naval Beach Group, and Naval Special Warfare directly support key Naval operating concepts and plans such as Distributed Maritime Operations (DMO), Expeditionary Advanced Base Operations (EABO), Maritime Logistics Campaign Plans, and INDOPACOM's Posture Initiatives. This equipment provides the Navy Expeditionary Combat Forces mission of supporting contested logistics and connecting shore logistics activities such as reload, resupply, refuel, revive, and repair operations to the afloat Naval force. This equipment additionally supports the execution of Humanitarian Assistance & Disaster Relief (HADR) support to Partner Nations and Defense Support of Civil Authorities (DSCA). Procurement of this equipment supports the establishment of a new Pacific focused Naval Cargo Handling Battalion (NCHB). A capability that provides Vertical Launched System (VLS) reload of surface combatants from multiple locations. Additionally, this procurement supports the addition of six Underwater Construction Dive Detachments and six Port Damage Repair Companies. Both of which are critical components of executing Port Damage Repair in a contested environment or in support of Partner Nations. This equipment empowers the Naval Construction Force, Naval Beach Group, and Naval Special Warfare to execute contested logistics operations, seamlessly connecting shore-based activities (reload, resupply, refuel, revive, and repair) with the afloat naval force. It is also instrumental in providing Humanitarian Assistance & Disaster Relief (HADR) and Defense Support of Civil Authorities (DSCA). Specifically, this procurement supports: -Establishment of a Pacific-focused Naval Cargo Handling Battalion (NCHB): Provides enhanced Vertical Launch System (VLS) reload capability for surface combatants from multiple locations. -Addition of six Underwater Construction Dive Detachments and six Port Damage Repair Companies: Bolsters the Navy's capacity for rapid port damage repair in contested environments and in support of Partner Nations. COMBAT CONSTRUCTION SUPPORT EQUIPMENT The equipment included in this program is used to provide responsive military construction support to forces during military operations, construction of base facilities, and in the conduct of limited defensive operations. These facilities and equipment are vital for maintaining the integrity and sustainability during contingency and wartime operations. Equipment items include containers required for prepacking and securing on-site storage of equipment to expedite mobilization, fuel storage tanks required for on-site storage of fuel, water purification units required for camp water treatment systems, water storage tanks (collapsible fabric) required for water treatment, storage and distribution systems, power distribution panel boards required for camp electrical distribution systems, and tension fabric structures required for expeditionary facilities to provide equipment maintenance and company shops, berthing, laundry, and combat operations centers. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 1 of 42 P-1 Line #125 Volume 5 - 75 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6060 / Items less than $5 Million Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This equipment provides essential military construction support for a variety of operations, from base facility construction to limited defensive operations. These assets are vital for maintaining operational integrity and sustainability during contingency and wartime operations. Key procurements include: -Containers: For pre-packing and secure on-site equipment storage, enabling rapid mobilization. -Fuel Storage Tanks: For on-site fuel storage. -Water Purification Units & Collapsible Fabric Water Storage Tanks: For establishing camp water treatment, storage, and distribution systems. -Power Distribution Panel Boards: For camp electrical distribution systems. -Tension Fabric Structures: For establishing expeditionary facilities such as equipment maintenance and company shops, berthing areas, laundry facilities, and combat operations centers. This investment in specialized equipment and combat construction support systems is essential for enhancing the Navy's expeditionary readiness, operational reach, and ability to support a wide range of missions in diverse and challenging environments MOBILE UTILITIES SUPPORT EQUIPMENT (MUSE) Equipment consists of electric power generation plants, electric substations, and electric switch gear. MUSE provides short-term support for utility requirements resulting from equipment failures, changes in planning and programming, temporary replacement of utilities equipment which is out of service, ship support and testing, expeditionary military operations, and utilities outages resulting from natural disaster. Operations supported: submarine testing, ships' repair, retrofit and nuclear refueling, cold iron applications, serious utility system deficiencies, MILCON delay, and advanced base requirements. OCEAN CONSTRUCTION EQUIPMENT Specialized equipment and facilities components used to perform site selection, construction, inspection, maintenance, repair and removal fixed underwater and ocean facilities, and in support of shore-based hyperbaric. Utilization of funds from this program sustains capability to meet requirements for ocean facility site survey, construction, inspection, repair, and removal, resulting in the ability of the fleet to retain its readiness through utilization of its underwater facilities. -----------------SPECIAL PURPOSE VEHICLES (BSO 41) - This program provides various non-tactical special purpose vehicles, equipment, and trailers of commercial design to support mission critical and mission essential support to our Navy shore commands. Vehicles included in this category but not limited to aircraft refuelers, ammunition handling trucks, overhead maintenance & utility bucket trucks, pole and line trucks, runway & street sweepers, tank trucks, field servicing vehicles, waste collection/cleaner trucks, van/stake bed semi-trailers, low bed semi-trailers, tank trailers, wreckers, low speed electric vehicles, etc. -----------------SPECIAL PURPOSE VEHICLES (BSO 30) - This program procures Ballistic Engineered Armored Response Attack Trucks (BEARCAT) in the Navy Nuclear Deterrence Mission. These armored vehicles support security forces to deter, delay, and defeat unauthorized shore access to nuclear weapons at Strategic Weapons Facilities. Vehicles are procured to replace existing vehicles used in security patrols and missile movement convoys; replacement is based on meeting or exceeded service life due to age and usage. Maintenance Support Equipment (BSO 60): NECC N46 Equipment Procurement Funding Program for the procurement of specialized equipment used by NECC forces, but unsupported by a designated program office. This funding will provide NECC with procurement funds to support NECC facility modifications/infrastructures, such as storage racks for warehouses to store TOA; modular storage buildings for weapons and ammunition; and temporary administrative trailer requirements, not covered under OMN or MILCON funding. [P40A / [USFFC] ORDNANCE CHASSIS TRAILERS]: Chassis trailer for NMCLANT Unit Charleston [P40A / ROTA Spain P622 Hyperbaric Systems]: FY26 funds support the procurement of a Hyperbaric Chamber in support of the EOD command at Naval Station Rota. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 2 of 42 P-1 Line #125 Volume 5 - 76 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6060 / Items less than $5 Million Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / NECC N46 Equipment Infrastructure]: FY27 funds increased $0.929M to support the procurement of required Infrastructure equipment for commands relocating, not covered by OMN or MILCON funding. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 3 of 42 P-1 Line #125 Volume 5 - 77 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6060 / Items less than $5 Million Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Items under $5 million P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 233.643 - / 103.014 - / 127.086 - / 131.449 - / 233.643 - / 103.014 - / 127.086 - / 131.449 - / - - / 131.449 / 0.000 - / 131.449 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Special Purpose Vehicles (BSO 52): Public Works (PW): FY27 reflects a decrease ($4.3M) in supports the acquisition and sustainment of specialized vehicles critical for shore-based power and water infrastructure operations and Naval Surface Warfare Center mission. These vehicles are critical to maintaining daily operational effectiveness and installation readiness. These assets perform essential functions such as power line maintenance, cargo transport, equipment haulage, emergency response and base infrastructure support. Their availability to sustain base operations, maintain infrastructure, and support mission requirements at shore installation. Additionally, the funding supports fielding a fleet of Special Purpose Vehicles for Naval Special Warfare with expeditionary tent camp equipment used to support troops operating and training in the field; prime movers' trucks to tow special operations craft; and large trucks for moving ammunition, weapons and cargo. This logistic support is critical to train SEAL and Special Boat Teams for deployment. In addition, the funding line supports Expeditionary priority mission capabilities Mobile Boat Hoist (MBH) higher priority actions and new phased approach for NCHB-3 E/S and addresses table of allowance procurement wholeness for IOC units of action due to high priority items for Navy Response Plan (NRP). The funding reduction limits the Navy's ability to replace aging and unserviceable vehicles, delays modernization efforts, and increase maintenance burdens on an already strained fleet. Ongoing shortfalls will limit the Navy's ability to maintain essential vehicle capabilities, which can disrupt base operations, strain logistics, and reduce the level of support available to fleet activities, putting operational readiness and personnel safety at risk. Combat Construction Support Equipment - Expeditionary: FY27 funding continues to support procurement of trailers, expeditionary facilities and fuel/water services. Funds support acquisition of expeditionary basing engineered capabilities to integrate joint standardization board (JSB) approved equipment to ensure interoperability, energy enhancements and commonality across the Navy and DoW. These materiel assets support core mission requirements and are essential to the readiness and battlefield effectiveness. Mobile Utilities Support Equipment (MUSE): FY27 funds will be used to recapitalize the MUSE generator and substation equipment. Current inventory and condition assessment of MUSE power generation assets rated 77% of generation capability. The assessment also rated a zero percent capability to support CONUS prime power missions. The major risk is long term limited availability of MUSE (total and EPA compliant) generation assets with continued increases in unsupported MUSE missions. Railway Equipment: $16.1M increase in FY27 funds the urgent replacement of mission-critical dilapidated railcars to prevent operational failure. This investment directly addresses the rapidly declining state of the Navy's railcar inventory, which is essential for maintaining ordnance loading operations. The current railcars, averaging 75 years old and 47 years beyond their useful life expectancy as defined by NAVFAC P-300, are consistently failing and being removed from service, creating an increasingly fragile logistics capability. Ocean Construction Equipment: FY27 funds provided for procurement of specialized ocean construction equipment and will be utilized to procure underwater survey systems, underwater sonar systems, and underwater construction equipment. Special Purpose Vehicles (BSO 41): FY27 funds provided for procurement of various non-tactical special purpose vehicles, equipment, and trailers. Special Purpose Vehicles (BSO 30): FY27 funds provided for the procurement of BEARCATs to support mission requirements and replace existing vehicles used in security patrols and missile movement convoys; replacement is based on meeting or exceeded service life due to age and usage. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 4 of 42 P-1 Line #125 Volume 5 - 78 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6060 / Items less than $5 Million Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Maintenance Support Equipment (BSO 60): FY27 funds increased ($0.929M) to support the procurement of required Infrastructure equipment for commands relocation, not covered by OMN or MILCON funding. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 5 of 42 P-1 Line #125 Volume 5 - 79 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Special Purpose Vehicles - Expeditionary 1.1) Expeditionary Sweeper, Runway, A (†) Truck Mounted 1.2) Expeditionary Trk Dump 10CY (†) 1.3) Expeditionary - Trk Dump 10CY A A (†) Asphalt 1.4) Expeditionary Field Service Truck (†) A 1.5) Expeditionary Stake Truck 30 Ton A 1.6) Expeditionary Trk Tank Water Dist A (1)(†) (†) 3100 Gal 1.7) Expeditionary Trk Trac 160k GCW A 1.8) Expeditionary Trk Util Grounds Maint A 1.9) Expeditionary - A (2)(†) (3)(†) (†) Trk, Util, Repair 1.10) Expeditionary Trlr 60T Semi Lowbed A (†) Ded Hyd Rgn 1.11) Expeditionary - Trlr Cargo 1 and A (†) Quarter Ton 1.12) Expeditionary Trlr Enclosed 2 Axle 2T A (†) 1.13) Expeditionary - Trlr Highbed Roller Conveyor 40ft Deck 20T - - - - - - - - - - - 261,700.00 - - 1 - 390,150.00 9 3.511 - - - - - - - - - 0.262 265,000.00 2 0.530 - - - - - - - - - 16 5.094 - - - - - - - - - - - - - - - - - - - - 71 19.204 - - - 318,375.00 447,500.00 2 0.895 456,450.00 1 0.456 255,000.00 16 4.080 260,566.67 36 9.380 265,294.12 31 8.224 270,478.26 71 19.204 - - - 338,250.00 4 1.353 345,015.00 6 2.070 - - - - - 2.040 260,117.65 16 4.162 265,300.00 38 10.081 271,000.00 44 11.924 - - - 271,000.00 44 11.924 10 0.379 - - - 37,900.00 10 0.379 - - 255,000.00 - 8 - - - - - - 153,000.00 6 - - - 37,416.67 16 0.599 38,222.22 8 0.306 - - - - - - - - - 0.918 156,062.50 42 6.555 158,840.91 10 1.588 - - - - - - - - - - - - - - - 27,500.00 - - - - - - 37,900.00 - - - - - 270,478.26 - 31,844.44 11 0.350 - - - - - - - - - 2 0.055 28,000.00 3 0.084 - - - - - - - - - 114,000.00 1 0.114 - - - - - - - - - - - 0.918 468,333.33 6 2.810 477,500.00 11 5.253 - - - - - - - - - A - (†) 1.14) Expeditionary - Trlr Lowbed Heavy Haul (†) A 459,000.00 LI 6060 - Items less than $5 Million Navy 2 UNCLASSIFIED Page 6 of 42 P-1 Line #125 Volume 5 - 80 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.15) Expeditionary Trlr Lowbed Hyd Rgn A (4)(†) 60T 1.16) Expeditionary Trlr Stake Breakbulk 34T A (†) 1.17) Expeditionary - Trlr Tank Water Potable 400G MAIS Code Unit Cost ($) (†) Unit 19 2.713 145,629.63 A A M915 A 1.23) Expeditionary TRLR Hydraulic Tail Winch 40T ($) 142,789.47 A (†) ($ M) 1.836 (†) 1.20) Expeditionary Skid Lubrication Unit (Each) Unit Cost 12 Trlr Tilt Deck 1.19) Expeditionary - Skid Lubrication Qty 153,000.00 (†) 1.18) Expeditionary - FY 2025 Total Cost A Subtotal: 1) Special Purpose Vehicles - Expeditionary ($ M) - ($) - 28 - Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 159,181.20 31 4.935 163,364.83 46 7.515 - - - 163,364.83 46 7.515 4.078 148,571.43 84 12.480 152,346.94 47 7.160 - - - 152,346.94 47 7.160 8 0.441 10 0.563 - - - 56,300.00 10 0.563 - - - - - 18,750.00 4 0.075 - - - - - - - - - - - - - - - 78,000.00 6 0.468 - - - - - - - - - - - - 0.173 88,230.00 4 0.353 2 - (Each) Unit Cost FY 2027 Base Total Cost - 86,500.00 (5)(†) - FY 2026 Total Cost Qty Aggregated Items Title: Items under $5 million - 55,169.00 89,995.00 5 56,300.00 0.450 91,794.00 1 0.092 - - - 91,794.00 1 0.092 229,500.00 3 0.689 - - - 229,500.00 3 0.689 47.526 - - - - - - - - - - - - - - 13.573 - - 30.720 - - 55.397 - - 4.467 82,618.00 7 0.578 - - 1.497 74,200.00 5 0.371 - - 0.611 140,481.00 1 0.140 143,347.00 - - 1.880 179,160.00 6 1.075 182,814.00 - - 0.422 - - - - 47.526 2) Special Purpose Vehicles (Alpha A-N) - PW 2.1) BSVE-0525-01, TRUCK, STAKE/FLT, 4X2,12-24FT, 25,000 A 84,270.00 2 0.169 85,790.00 2 0.172 - - - 85,790.00 2 0.172 - 77,198.00 2 0.154 - - - 77,198.00 2 0.154 4 0.573 146,214.00 2 0.292 - - - 146,214.00 2 0.292 2 0.366 186,470.00 3 0.559 - - - 186,470.00 3 0.559 2 0.192 - - - 95,780.00 2 0.192 (†) GVWR, SIN 434 2.2) BSVE-0525-02 4X2 STAKE/ FLAT BED, 9-22 FEET, 22000-24000 LBS GVWR A - - (6)(†) 2.3) BSVE-0525-03TRUCK STAKE EXTENDED CAB 33,000LBS SIN 531 A 2.4) BSVE-0527-01TRUCK BOX/VAN 12-22 FT BODY 16001 GVWR AND A (7)(†) UP SIN 474 (†) 2.5) BSVE-0600-00, VEHICLE MISC HEAVY SPECIAL A LI 6060 - Items less than $5 Million Navy - - - - - UNCLASSIFIED Page 7 of 42 - 95,780.00 P-1 Line #125 Volume 5 - 81 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] PURPOSE 16,001 GVWR Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) A - - 1.002 - - - - - - - 137,600.00 10 1.376 140,420.00 4 1.498 3 0.421 - - - - - - - 140,420.00 3 0.421 (9)(†) 2.7) BSVE-0605RH-TRUCK BOX/ VAN 12-22 FT BODY 16001 GVWR A 367,200.00 4 1.469 374,544.00 - 0.538 112,500.00 2 0.225 - - 6.166 265,252.00 1 0.265 281,320.00 - - 0.272 - - - - - 5.530 - - - - - 3.063 117,631.00 - - 0.990 - - - - - - - (†) 2.8) BSVE-0614-00, TRUCK TRACTOR, 4X2, 50000-65000 GCWR MAIS FY 2026 Total Cost (8)(†) 2.6) BSVE-0603-01, TRUCK, STAKE/FLT, 4X2, 10-14FT, 19501 GVWR ID CD FY 2025 Total Cost Aggregated Items Title: Items under $5 million A - - - 117,045.00 2 0.234 - - - 117,045.00 2 0.234 1.969 283,220.00 1 0.283 - - - 283,220.00 1 0.283 2 0.555 - - - 277,542.00 2 0.555 (10)(†) 2.9) BSVE-0616-00TRUCK TRACTOR YARD SPOTTER NONSTANDARD A 2.10) BSVE 0630-01, 6X4 TRUCK TRACTOR, 43,000 A 7 (11)(†) LBS - - - 277,542.00 (12)(†) 2.11) BSVE-0636-00TRUCK STAKE 6X4,14-28FT, 54,000-80,000LBS, A 245,998.00 6 1.476 - - - - - - - - - 1 0.118 119,965.00 4 0.480 - - - - - - - - - 93,133.00 3 0.279 95,000.00 3 0.285 0.097 - - - - 2.114 208,663.00 12 2.504 212,242.00 10 2.122 - - - - - - - - - - 4.601 141,500.00 2 0.283 144,330.00 8 1.155 - - - - - - - - - (†) GVWR, SIN 735 2.12) BSVE-0636-01TRK STAKE 6X4, 14-28 ft, 62,000-80,000 GVWR, 633/634 (†) 2.13) BSVE-0636-01 TRUCK, STAKE 4X4,12-26FT, 39,000 GVWR A A 96,919.00 1 96,919.00 1 0.097 (13)(†) 2.14) BSVE-0644-00 DUMP TRUCK 6X6,12-14 CY, 54,000-60,000LBS GVWR SIN 844 A (†) 2.15) BSVE-0645-00 TRACTOR HIGHWAY DAY CAB, 6X4, 100,000LBS GCWR A (†) SIN 625H lbs LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 8 of 42 P-1 Line #125 Volume 5 - 82 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.16) BSVE-0645-01 TRUCK, STAKE/ FLT 6X6 14-26FT 56,000-80,000LBS A 2.17) BSVE-0645-01 TRACTOR, HIGHWAY, 6X4, 90,000-95,000 A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) 2.205 184,465.00 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) - - 4.516 183,789.00 12 11 2.029 189,877.00 - - 0.323 - 6 1.231 - - 2.392 167,963.00 1 0.168 - - - 174,732.00 - - 1.139 120,909.00 1 0.121 - - - - - 10.158 245,071.00 1 0.245 249,972.00 - - - 4 1.054 268,821.00 - - 0.226 - - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) 189,877.00 ($ M) 0.190 - - - 1 0.190 - - - - 3 0.524 - - - 174,732.00 3 0.524 125,794.00 2 0.252 - - - 125,794.00 2 0.252 2 0.500 254,971.44 2 0.510 - - - 254,971.44 2 0.510 2 0.538 261,800.00 2 0.524 - - - 261,800.00 2 0.524 230,144.00 1 0.230 232,500.00 2 0.465 - - - 232,500.00 2 0.465 201,000.00 1 0.201 - - - - 1.148 390,225.00 2 0.780 398,030.00 1.592 - - - (14)(†) - - 205,100.00 - - - - - (†) GCWR, SIN 624H 2.18) BSVE-0649-00 6X4 LONGHAUL TRACTOR 6x4, 90,000-95,000LBS, GCWR, SIN 624S A 2.19) BSVE-0649-00, 6X4 VOCATIONAL TRACTOR, 90000-95000LBS GCWR, SIN 625S A 2.20) BSVE-0649-01TRACTOR, 6X4, 80,000LBS GCWR A (15)(†) (16)(†) SIN 625H (†) 2.21) BSVE-0704-01TRUCK AMMO WITH HYDRAULIC CRANE 16001 GVWR AND A 263,550.00 (†) UP 2.22) BSVE-0710-00/01TRUCK FIELD SERVICING 24,000 GVWR A (†) 2.23) BSVE-0714-00 TRUCK TIRE SERVICING 4X2 28000 GVWR - - - - - (†) 2.24) BSVE-0723-00/01TRUCK MAINTENANCE POLE LINE W/ ROTATING HYD DERRICK A A 1.125 382,574.00 3 4 398,030.00 4 1.592 (17)(†) LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 9 of 42 P-1 Line #125 Volume 5 - 83 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.25) BSVE-0725-01/03/07 TRUCK MAINTENANCE OVERHEAD AERIAL A SERVICE MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 4 ($) - - 9.553 219,000.00 1 0.219 222,600.00 - - 0.133 136,094.00 1 0.136 - - - - - 0.594 172,000.00 1 0.172 - - - 177,514.00 - - 1.114 - - - - - - 3.131 134,114.00 0.134 - - - - - - - - 1.885 387,219.00 0.774 - - 0.571 - - - 4.433 196,736.00 3 0.590 200,670.00 5 1.003 - - - 1.608 327,495.00 6 1.965 333,443.00 6 2.001 - Qty (Each) 0.890 230,000.00 FY 2027 OOC Total Cost Unit Cost ($ M) 5 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) 230,000.00 ($ M) 1.150 - - - 5 1.150 - - - - 3 0.533 - - - 177,514.00 3 0.533 176,900.00 2 0.354 - - - 176,900.00 2 0.354 - 138,260.00 1 0.138 - - - 138,260.00 1 0.138 - - 229,626.00 2 0.459 - - - 229,626.00 2 0.459 - - - 421,550.00 2 0.843 - - - 421,550.00 2 0.843 - - - 302,902.00 3 0.909 - - - 302,902.00 3 0.909 - - - - - - - - - - - - - - - - (†) 2.26) BSVE-0725-RHTRUCK MOUNTED OVERHEAD AERIAL A - - - - - (†) SERVICE RHD 2.27) BSVE-0729-00, WRECKER, 8T, RECOVERY BOOM, SIN 972 (18)(†) 2.28) BSVE-0729-01 WRECKER, 12T, IND RECOVERY BOOM AND UNDERLIFT, SIN 973 A A - - (19)(†) 2.29) BSVE-0729-02/03 WRECKER, 16T, INTEGRATED RECOVERY BOOM A 1 (†) UNDERLIFT 2.30) BSVE-0735-00 THREE REEL HANDLING/ TENSIONING POWERED A - - - (20)(†) 2.31) BSVE-0751-00/01TRUCK TANK FUEL SERVICING 1 SYSTEM 1 TANK A 2.32) BSVE-0751-02TRUCK TANK FUEL SERVICING 2 SYSTEM 2 TANK A 2.33) BSVE-0756-00TRUCK TANK AVGAS/JETFUEL 5000-7000 A 2 (21)(†) - - (22)(†) GALLON (†) 2.34) BSVE-0756-01/02/03 A LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 10 of 42 P-1 Line #125 Volume 5 - 84 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] TRUCK TANK AVGAS/JETFUEL ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) 10,000 GALLON 2.35) BSVE-0758-00TRUCK TANK WATER (DRINKING WATER) 2000-2999 GALLON NONSTD A - - - 223,730.00 1 0.224 - - - 16.462 - - 20.872 228,205.00 - - 76.054 - - 0.045 9,363.00 3 0.028 9,551.00 4 0.038 9,742.00 - - 2.351 37,025.00 3 0.111 37,773.00 1 0.038 - - 1.558 116,744.00 2 0.233 119,078.00 - - 0.872 62,232.00 3 0.187 - - 1.613 78,240.00 2 0.156 - - 0.451 - - 0.435 116,477.00 - - 1 0.228 - - - 228,205.00 1 0.228 11.630 - - - 1 0.010 - - - 9,742.00 1 0.010 38,528.46 5 0.193 - - - 38,528.46 5 0.193 5 0.595 121,292.00 6 0.728 - - - 121,292.00 6 0.728 3 0.196 66,708.00 5 0.334 - - - 66,708.00 5 0.334 - 81,401.00 1 0.081 - - - 81,401.00 1 0.081 0.230 118,320.00 2 0.237 - - - 118,320.00 2 0.237 (23)(†) Subtotal: 2) Special Purpose Vehicles (Alpha A-N) - PW - - - - - - 11.630 3) Special Purpose Trailers (Alpha Code P) - PW 3.1) BSVE-0800/0805 TRAILER SPECIAL PURPOSE NONSTANDARD A 3.2) BSVE-0816-00SEMITRAILER STAKE 2-3 AXLE 20 TON WITHOUT A (24)(†) STAKES (25)(†) 3.3) BSVE-0816-01 SEMITRAILER STAKE 20 TON 40FT W/O STAKES (†) 3.4) BSVE-0816-02SEMITRAILER STAKE 2-3 AXLE 20 TON 40-55 FT WITH STAKES A A 65,400.00 (26)(†) 3.5) BSVE-0817-00SEMITRAILER VAN 2 AXLE A - - (†) NONSTANDARD 3.6) BSVE-0817-01SEMITRAILER VAN 2 AXLE 20 TON UP TO A - - - 115,000.00 2 (†) 55 FT 3.7) BSVE-0820-01SEMITRAILER VAN REFRIGERATOR 2 AXLE 20 TON 40-55 A 7 0.815 - - - 121,163.00 2 0.242 - - - 121,163.00 2 0.242 1 0.164 - - - 170,105.00 1 0.170 - - - 170,105.00 1 0.170 (†) FT 3.8) BSVE-0821-00SEMITRAILER LOWBED 4 WHEEL A LI 6060 - Items less than $5 Million Navy - 163,500.00 UNCLASSIFIED Page 11 of 42 P-1 Line #125 Volume 5 - 85 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] NONSTANDARD ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (27)(†) 3.9) BSVE-0822-01SEMITRAILER DROP DECK 2 AXLE 20 A - - 0.140 - - - - - - 34,583.00 1 0.035 - - - 34,583.00 1 0.035 - - 4.608 71,134.00 1 0.071 0.218 74,008.00 3 0.222 - - - 74,008.00 3 0.222 - - 1.602 42,500.00 4 0.170 - - - - - - - - - 0.092 - - - - 93,840.00 2 0.188 - - - 93,840.00 2 0.188 - - 0.447 43,000.00 3 0.129 - - - 44,440.00 2 0.089 - - - 44,440.00 2 0.089 - - 3.044 104,366.00 4 0.417 - - - 109,565.00 2 0.219 - - - 109,565.00 2 0.219 - - 5.303 2 0.140 72,296.00 4 0.289 73,200.00 3 0.220 - - - 73,200.00 3 0.220 - - 2.181 - - - 60,180.00 2 0.120 62,888.10 4 0.252 - - - 62,888.10 4 0.252 - - 0.284 - - - - 20,533.62 2 0.041 - - - 20,533.62 2 0.041 - - - 0.157 80,168.00 3 0.241 - - - 80,168.00 3 0.241 (†) TON 3.10) BSVE-0825-00SEMITRAILER LOWBED 2 AXLE 35 TON NONSTD A 72,557.00 3 (†) 3.11) BSVE-0825-01SEMITRAILER LOWBED 3 AXLE 35 A - - - - - (†) TON 3.12) BSVE 0826-00 STEP DECK TRAILER W/ RAMPS A 3.13) BSVE-0826-01SEMITRAILER LOWBED 3 AXLE 50 A - - (28)(†) (†) TON 3.14) BSVE-0826-02SEMITRAILER LOWBED 3 AXLE DETACHABLE A (†) GOOSENECK 3.15) BSVE-0827-00SEMITRAILER LOWBED 3 AXLE 60 TON NONSTD 70,180.00 (†) 3.16) BSVE-0827-01SEMITRAILER LOWBED 3 AXLE 60 TON A A (29)(†) 3.17) BSVE-0832-00TRAILER HYDRAULIC ELEVATING BODY A - - (†) NONSTD 3.18) BSVE-0832-01/02/03 TRAILER LOWBED UP TO 18000 GVWR STATIONARY A 77,025.00 2 0.154 78,580.00 2 (†) AXLE LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 12 of 42 P-1 Line #125 Volume 5 - 86 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.19) BSVE-0832-04SEMITRAILER DROP DECK 20 TON HYDRAULIC RAMP A Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 56,110.00 4 ($) 0.224 Qty (Each) 57,244.00 FY 2027 Base Total Cost Unit Cost ($ M) 4 ($) - - 0.055 - - 0.230 - - 0.731 - - 0.592 - - - - - - - - 0.406 - - - - - - - - 1.644 213,648.00 - - 28.684 - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.229 58,400.00 2 0.117 - - - 58,400.00 2 0.117 - 61,000.00 2 0.122 - - - 61,000.00 2 0.122 0.080 40,781.00 2 0.082 - - - 40,781.00 2 0.082 - - - - (30)(†) WITH WINCH 3.20) BSVE-0848-00/01/02 TRAILER OR SEMITRAILER DUMP REFUSE MAIS FY 2025 Total Cost Aggregated Items Title: Items under $5 million A - - - - - (†) 3.21) BSVE-0862-00/01 TRAILER LOWBED TILT DECK TANDEM A 39,198.00 3 0.118 39,982.00 2 (†) AXLE 3.22) BSVE-0881-00SEMITRAILER TANK GENERAL PURPOSE UP TO 500 GALLON A 3.23) BSVE-0890-00SEMITRAILER TANK 4001-5999 GALLON A NONSTANDARD - - - - - 89,500.00 5 0.448 - - - 89,500.00 5 0.448 0.436 222,278.00 3 0.667 - - - 222,278.00 3 0.667 4.938 - - - (31) 3.24) BSVE-0892-00SEMITRAILER TANK 6000 GALLON AND UP A 1 0.214 217,920.00 2 (†) NONSTANDARD Subtotal: 3) Special Purpose Trailers (Alpha Code P) - PW - - 3.331 - 16,333.00 12 0.196 0.438 40,800.00 5 0.204 - - 0.078 26,630.00 6 0.160 - - 0.059 30,055.00 7 0.210 - 2.626 - - - - 4.938 4) Low Speed Vehicles (Alpha Code Q) - PW 4.1) BSVE-0905-00LOW SPEED VEHICLE 2 A 16,663.00 6 0.100 17,173.00 6 0.103 - - - 17,173.00 6 0.103 - - 41,848.00 5 0.209 - - - 41,848.00 5 0.209 - - 27,000.00 6 0.162 - - - 27,000.00 6 0.162 0.091 31,008.00 3 0.093 - - - 31,008.00 3 0.093 (†) PASSENGER 4.2) BSVE-0905-01LOW SPEED VEHICLE 2 PASSENGER (32)(†) 4.3) BSVE-0905-02LOW SPEED VEHICLE 4 PASSENGER A A (33)(†) 4.4) BSVE-0905-03LOW SPEED VEHICLE 6 A 30,400.00 3 (†) PASSENGER VAN LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 13 of 42 P-1 Line #125 Volume 5 - 87 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.5) BSVE-0905-04 LOW SPEED VEHICLE 2 PASSENGER W/ A Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.145 36,720.00 4 0.147 37,454.00 4 0.150 37,703.00 6 0.226 - - - 37,703.00 6 0.226 - - - 33,700.00 3 0.101 34,000.00 2 0.068 34,686.00 6 0.208 - - - 34,686.00 6 0.208 - - 0.720 1.001 - - - (34)(†) FLATBED 4.6) BSVE-0905-05 LOW SPEED VEHICLE, CARGO VAN MAIS FY 2025 Total Cost Aggregated Items Title: Items under $5 million A (35)(†) Subtotal: 4) Low Speed Vehicles (Alpha Code Q) - PW - - 1.018 - - 0.409 - - - - 1.001 5) Special Purpose- Vacuum, Sweepers, Refuse (Alpha Code S) - PW 5.1) BSVE-5408-02CLEANER VACUUM SELF-PROPELLED AIRFIELD A - - 2.285 472,188.00 1 0.472 476,321.00 1 0.476 482,371.00 1 0.482 - - - 482,371.00 1 0.482 - - 0.924 471,240.00 2 0.942 480,851.00 2 0.962 490,564.00 1 0.491 - - - 490,564.00 1 0.491 - - 529,180.00 1 0.529 - - - - - - 0.445 227,341.66 3 0.682 231,337.00 3 0.694 235,963.74 2 0.472 - - - 235,963.74 2 0.472 - - 1.227 51,700.00 3 0.155 5 0.264 53,795.00 1 0.054 - - - 53,795.00 1 0.054 - - 0.471 480,420.00 4 1.922 - - - 499,829.00 2 1.000 - - - 499,829.00 2 1.000 - - 0.245 249,847.00 5 1.249 - - - 259,631.00 2 0.519 - - - 259,631.00 2 0.519 - - 5.220 171,501.00 3 0.515 - - - 179,505.00 2 0.359 - - - 179,505.00 2 0.359 (†) 5.2) BSVE-5409-00CLEANER BASIN/ MANHOLE VACUUM/ HYD TRK MTD A (†) 5.3) BSVE-5414-00CLEANER SEPTIC TANK/CESSPOOL A - - - - - - - - - (†) TRK MTD NONSTD 5.4) BSVE-5414-01CLEANER SEWAGE/WASTE COLLECTION 1300 GALLON A (†) 5.5) BSVE-5416-00CLEANER PIPE/ SEWER WATER JET TRUCK MOUNTED NONSTANDARD A 5.6) BSVE-5416-01CLEANER PIPE/ SEWER WATER JET TRUCK MOUNTED A 5.7) BSVE-5720-01SWEEPER VACUUM STREET SELF- A 52,740.00 (36)(†) (37)(†) PROPELLED (38)(†) 5.8) BSVE-5831/5833-00TRUCK MATERIAL A LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 14 of 42 P-1 Line #125 Volume 5 - 88 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] HANDLING CHAIN/ CABLE HOIST/HAUL ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (39)(†) 5.9) BSVE-5833-01TRUCK MATERIAL HANDLING HOIST/ HAUL UP TO 45 CY NONSTANDARD A 5.10) BSVE-5835-00/01TRUCK REFUSE FRONT LOAD WITH A - - 0.246 251,234.00 4 1.005 256,059.00 1 0.256 260,000.00 3 0.780 - - - 260,000.00 3 0.780 - - 0.709 361,584.00 2 0.723 368,815.00 4 1.475 376,411.00 1 0.376 - - - 376,411.00 1 0.376 - - 11.772 4.533 - - - - - 1.419 - - - - 1.419 - - - - 22.691 - - - 2,521K (40)(†) FORK 35 CY (41)(†) Subtotal: 5) Special PurposeVacuum, Sweepers, Refuse (Alpha Code S) - PW - - 8.194 4.835 300,670.00 16 - 4.835 - - - 3.700 - - - - - 4.127 - - - - 4.533 4.811 308,000.00 21 6.468 354,666.00 - 4.811 - - 6.468 - - - - - - - 2,521K 3.700 - - - - - - - - 22.691 - - - - - 22.691 - 3.372 - - 0.624 - - 0.789 - - 0.611 - - - - - 0.611 - 3.372 - - 0.624 - - 0.789 - - 0.611 - - - - - 0.611 1.077 - - - - - - - - - - - - - - - - 31,001.00 4 0.124 - - - 31,001.00 4 0.124 0.036 - - - 17,459.00 8 0.140 - - - 17,459.00 8 0.140 6) NTVE SIOP- Railway Equipment (Alpha V/W) - PW 6.1) BSVE-6110-00CAR RAILWAY BOX A (42)(†) Subtotal: 6) NTVE SIOP- Railway Equipment (Alpha V/W) - PW 4 - 354,666.00 4 - 1.419 1.419 7) NTVE BSO 60 NMC RAILWAY EQUIPMENT 7.1) BSVE-6540-00LOCOMOTIVE RAILROAD 60-69 TON A 9 9 22.691 (43)(†) Subtotal: 7) NTVE BSO 60 NMC RAILWAY EQUIPMENT 8) Integrated Logistics Support (ILS) Costs - Expeditionary 8.1) Expeditionary ILS Costs A Subtotal: 8) Integrated Logistics Support (ILS) Costs - Expeditionary 9) COMBAT CONSTRUCTION SUPPORT EQUIPMENT - Expeditionary 9.1) Expeditionary ADR LWPS 125 GPH A 9.2) Expeditionary - A (44)(†) SIXCON Fuel (45) 9.3) Expeditionary - ADR Tank Fabric Onion (46)(†) A - - - 39,300.00 10 0.393 7,000.00 1 0.007 LI 6060 - Items less than $5 Million Navy 179,500.00 - 7,200.00 6 - 5 UNCLASSIFIED Page 15 of 42 P-1 Line #125 Volume 5 - 89 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 9.4) Expeditionary - A (†) Battalion Aid Station 9.5) Expeditionary Berthing, Integrated, 4 Tent Configuration, w/ MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 457,000.00 1 0.457 455,000.00 6 2.730 464,100.00 1 0.464 - - - - - - - - - 618,000.00 2 1.236 648,461.54 12 7.782 681,000.00 1 0.681 - - - - - - - - - 740,750.00 8 5.926 620,000.00 1 0.620 651,000.00 1 0.651 - - - - - - - - - 17,535.35 99 1.736 10,459.46 13 0.136 10,668.00 16 0.171 - - - - - - - - - 14,500.00 2 0.029 14,375.00 8 0.115 9,166.67 6 0.055 0.033 - - - 91,500.00 2 0.183 93,500.00 2 0.187 - - - - - - - 106,000.00 2 0.212 114,500.00 2 0.229 - - - 121,714.29 7 0.852 114,500.00 4 0.458 116,750.00 A (†) Power 9.6) Expeditionary Command Operations Center, Small 9.7) Expeditionary Containers A (†) (†) 9.8) Expeditionary Diagnostic Tool Kit, A A (†) Various 9.9) Expeditionary Enhanced Production Module, LWPS A (†) 9.10) Expeditionary Latrine System (47)(†) 9.11) Expeditionary (†) A A Shower System 9.12) Expeditionary Fuel Service Supply Point (FSSP) 9.13) Expeditionary Laundry, Self-service TRICON GRN (†) 9.15) Expeditionary - Maintenance Small STCF A (49)(†) 9.14) Expeditionary LSA Adapter A (48) A A (†) 9.16) Expeditionary - Mobile Expandable Container Configuration (MECC) A 9.17) Expeditionary - A - - - - - 5 - 8,200.00 - 4 - 0.033 - 6 0.714 - - - 119,076.92 6 0.714 0.584 119,071.43 4 0.476 - - - 119,071.43 4 0.476 - - - - 1,197K 13 15.562 - - - 1,197K 13 15.562 119,000.00 3 0.357 - - - 119,000.00 3 0.357 - - - - 1 0.112 114,500.00 2 0.229 - - - 4,333.33 12 0.052 4,416.67 12 0.053 - - - 173,800.00 5 0.869 182,000.00 3 0.546 191,000.00 304,000.00 1 0.304 - - 4 119,076.92 112,000.00 - 8,200.00 - 316,281.60 - - - - - 8 1.528 201,000.00 3 0.603 - - - 201,000.00 3 0.603 2 0.633 322,607.23 4 1.290 - - - 322,607.23 4 1.290 - - - - 1.120 - - - (50)(†) (†) NEFK STCF 9.18) Expeditionary - PDR Dive Platform (51)(†) A - - - 250,000.00 9 2.250 - - - - - - 267,500.00 4 1.070 - - - LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 16 of 42 - 280,000.00 - 4 P-1 Line #125 - 280,000.00 - - 4 1.120 Volume 5 - 90 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 9.19) Expeditionary - PDR Expedient Fendering/Mooring Kit A 9.20) Expeditionary - A PDR ATON Kit (†) 9.21) Expeditionary PDR Boat Ramp (†) 9.22) Expeditionary PDR Matting (†) 9.23) Expeditionary - PDR Floating Work A A A (†) Platform 9.24) Expeditionary - PDR Pile Driving Barge A (†) 9.25) Expeditionary - SIXCON Water, Pump, DED, 125GPM MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 127,750.00 4 ($) 0.511 - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - Aggregated Items Title: Items under $5 million ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - 267,500.00 4 1.070 - - - - - - - - - - - - - - - 79,500.00 4 0.318 - - - - - - - - - - - - - - - 208,750.00 4 0.835 - - - - - - - - - - - - - - - 108,000.00 4 0.432 - - - - - - - - - - - - 1.683 - - - - - - - - - 520,000.00 2 1.040 - - - 561,000.00 3 26,000.00 3 0.078 26,000.00 3 0.078 - - - - - - - - - - - - 47,000.00 2 0.094 48,000.00 2 0.096 - - - - - - - - - - - - 1,500.00 12 0.018 - - - - - - - - - - - - - 25,500.00 2 0.051 0.052 - - - - - - - - - - - - 740,000.00 16 11.840 - - - - - - - - - - - - - 176,000.00 2 0.352 179,500.00 0.359 - - - 0.187 - - - 1.021 - - 0.053 - - - - - - - - - 2.295 - - - - - - - - - - - - A (†) 9.26) Expeditionary SIXCON Water, Tank, A (†) 900GAL 9.27) Expeditionary - Spill Containment Unit, Hazardous A - - (†) Material, 10'X10'X1' 9.28) Expeditionary Tool Kit, Mechanics Master Set A (†) 9.29) Expeditionary - Warehouse Small STCF A 9.30) Expeditionary - Water Purification A (52)(†) Equipment Set 9.31) Expeditionary Integrated Logistics Support (ILS) CCE A (53) 9.32) EXPEDITIONARY TRAILER 55T SEMI - - 3.780 26,000.00 - - 2 - 2 - 186,750.00 1 186,750.00 1 0.187 A 127,555.56 9 1.148 255,000.00 9 (†) LOWBED HYD LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 17 of 42 P-1 Line #125 Volume 5 - 91 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 9.33) PIER REPAIR WATER FRONT A (†) CAPBILITY SETS 9.34) EXPEDITIONARY WATER AND FUEL SERVICE CAP ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2,061K 1 2.061 21,857.14 7 0.153 - - - - - - - - - - - - 39,766.67 30 1.193 27,166.67 5 0.136 - - - - - - - - - - - - - - - - - - - - - - - - - - - 34.534 - - 24.363 - - 5.354 - - - 5.354 - - - - - - 1,364K - A A (54)(†) 9.36) Expeditionary Pump Centrifugal Fuel 100GPM W/ Filter Separator Code Unit Cost FY 2026 Total Cost (†) 9.35) Expeditionary - Heater, Water, 400,000BTU MAIS FY 2025 Total Cost Aggregated Items Title: Items under $5 million 40,750.00 4 0.163 41,524.75 10 0.415 - - - 41,524.75 10 0.415 - - 42,415.00 4 0.170 - - - 42,415.00 4 0.170 - - 6.666 - - 21.191 - - - - - 21.191 1.995 - - 2.654 - - 2.333 - - - - - 2.333 - 1.995 - - 2.654 - - 2.333 - - - - - 2.333 - - - - - - 1,610K 1.610 - - - 1,610K - - - - - - - - - 16 21.818 1,516K - 2.064 - - A (55)(†) Subtotal: 9) COMBAT CONSTRUCTION SUPPORT EQUIPMENT - Expeditionary 10) ACQUISITION SUPPORT 10.1) Expeditionary - Acquisition Support A (56) Subtotal: 10) ACQUISITION SUPPORT - 11) MOBILE UTILITIES SUPPORT EQUIPMENT (MUSE) 11.1) 2000 AMP, 5KV/15KV LOAD DISTRIBUTION SWITCHGEAR A 1 1 1.610 (58)(†) 11.2) 3200 AMP, 480 V MOBILE POWER MOUND AND MISC. AND CONNECTORS A 520,000.00 1 0.520 - - - - 7.580 1,954K 2 3.908 1,491K 2 2.982 - - - 1,491K 2 2.982 - - - - 1,481K 1 1.481 - - - 1,481K 1 1.481 - - 2,300K 4.600 1,590K 2 3.180 - - - 1,590K 2 3.180 1.500 - - - - - - - - (†) 11.3) DIESEL GENERATORS (4160V) (57) A (†) 11.4) 2500 KVA, 5KV/15KV TRANSFORMER A (59) 11.5) 3750 KVA, 5KV/480 V TRANSFORMER A 11.6) 5000 KVA, 5KV/15KV A 410,000.00 3 1.230 1,032K 4 4.127 250,000.00 LI 6060 - Items less than $5 Million Navy 5 6 - 2 - UNCLASSIFIED Page 18 of 42 - P-1 Line #125 - - Volume 5 - 92 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] TRANSFORMER ONLY ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) 11.9) 5000 KVA, 13KV/4160 V TRANSFORMER A 11.11) LHA-8 TEMPORARY 4160V A SHORE POWER 1,056K (†) Subtotal: 11) MOBILE UTILITIES SUPPORT EQUIPMENT (MUSE) 4 4.224 - - - - - - - - - - - 33.463 - - 9.080 36 2.828 - 2.828 - - 12,000K - 1 - - - - - - - - - - - 12.000 - - - - - - - - - 21.028 - - 9.253 - - - - - 9.253 0.353 - - - 0.353 - - - 0.192 - - - - - - - 12) OCEAN CONSTRUCTION EQUIPMENT 12.1) OCEAN CONSTRUCTION A (†) EQUIPMENT 78,555.56 Subtotal: 12) OCEAN CONSTRUCTION EQUIPMENT - 86,500.00 - 4 - 0.346 0.346 70,000.00 - 5 - 0.350 0.350 88,230.00 - 4 - 88,230.00 - 4 - 0.353 0.353 13) SPECIAL PURPOSE VEHICLES 13.2) NELO 0826-02 Step Deck Trailer w/ Ramps (†) 13.3) NELO Drop Deck w/Integral Ramps A 92,000.00 A - (†) 13.4) NELO Taut Liner Trailer, 48FT A 13.5) NELO Special Purpose Trailer A (60)(†) (Nonstandard) - 65,000.00 (61)(†) 13.6) NELO 0525-00, 4X2 STAKE/ FLAT BED, 12?24 FT, 25000?26000 SIN 1 3 0.092 98,000.00 1 0.098 94,048.00 2 0.188 95,929.00 - 2 - 0.192 - - - 65,091.00 3 0.195 0.195 - - - 67,891.00 2 0.136 69,385.00 4 0.278 - - - 69,385.00 4 0.278 - 11,750.00 4 0.047 - - - 11,750.00 4 0.047 - - 95,929.00 - - - 2 - - - - - - - - - 0.462 - - - 246,700.00 1 0.247 253,040.00 1 0.253 - - - 253,040.00 1 0.253 - - 0.268 - - - 276,421.00 1 0.276 283,080.00 1 0.283 - - - 283,080.00 1 0.283 - - 1.017 - - 0.098 - - 1.440 - - - A (†) 531 13.7) NELO 0645-00, 6X4 LONGHAUL TRACTOR, 90000? A (†) 95000 LBS Subtotal: 13) SPECIAL PURPOSE VEHICLES - - 1.042 - - 1.053 - - - - - 1.053 0.260 - - - - - - - - - 14) MAINTENANCE SUPPORT EQUIPMENT 14.1) [USFFC] ORDNANCE A LI 6060 - Items less than $5 Million Navy 260,000.00 1 UNCLASSIFIED Page 19 of 42 P-1 Line #125 Volume 5 - 93 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6060 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] CHASSIS TRAILERS ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items under $5 million Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (62)(†) 14.2) ROTA Spain P622 Hyperbaric Systems A (†) 14.3) NECC N46 Equipment Infrastructure A (63)(†) Subtotal: 14) MAINTENANCE SUPPORT EQUIPMENT - - - - - - 2,299K 1 2.299 - - - - - - - - - - - 1.440 - - - - - 2.559 37 12.297 394,400.00 - - 929,000.00 - 1 - - - - - 0.929 - - - 0.929 - - - 1.988 - - - - - 929,000.00 - - 1 - 0.929 0.929 15) SPECIAL PURPOSE VEHICLES 15.1) SPECIAL PURPOSE VEHICLES BEARCATS A 332,351.35 5 1.972 419,800.00 5 2.099 397,600.00 5 397,600.00 5 1.988 (64)(†) Subtotal: 15) SPECIAL PURPOSE VEHICLES - - 12.297 - - 1.972 - - 2.099 - - 1.988 - - - - - 1.988 Total - - 233.643 - - 103.014 - - 127.086 - - 131.449 - - - - - 131.449 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (2) Phased approach for Navy Cargo Handling Battalion and addresses table of allowance procurement wholeness for IOC units of action aligned to critical missions such as Vertical Launch and aircraft refueling. Critical end item for prioritized to enable Expeditionary Forces to meet Navy Response Plan (3) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (4) The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (5) (6) (7) (8) (9) Quantity increase supports the replacement of the equipment that is beyond economical repair FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. (10) (11) (12) (13) (14) FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 20 of 42 P-1 Line #125 Volume 5 - 94 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (30) (31) (32) (33) (34) (35) (36) (37) (38) (39) (40) (41) (42) (43) (44) (45) (46) (47) (48) P-1 Line Item Number / Title: 6060 / Items less than $5 Million Aggregated Items Title: Items under $5 million FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost increase is driven by increase in quantity to fulfill mission critical requirements. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 cost increase is driven by a higher quantity requirement to fulfill mission critical requirements that is beyond economical repairs. FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 Cost decrease is attributed to a reduction in quantity requirements and changes in mission requirements. FY27 increase funds the urgent replacement of a mission-critical dilapidated locomotive that is beyond economical repair. Critical end item prioritized to enable Expeditionary Forces to meet Navy Response Plan. Critical end item prioritized to enable Expeditionary Forces to meet Navy Response Plan. Critical end item prioritized to enable Expeditionary Forces to meet Navy Response Plan. Critical end item prioritized to enable Expeditionary Forces to meet Navy Response Plan. The Acquisition strategy for Expeditionary Construction equipment has changed to a Family of Buy approach balanced with Fleet priorities to meet the Navy Response Plan. The strategy goal is to procure a platform within a short range of time to minimize the number of configurations of each platform. This approach minimizes sailor training requirements, product support development costs, repair parts, among others. (49) (50) (51) (52) FY27 Cost increase is driven by increase in quantity to fulfill mission critical requirements. Increase to support Table of allowance requirements of Expeditionary units FY27 Cost increase is driven by increase in quantity to fulfill mission critical requirements. Critical end item prioritized to enable Expeditionary Forces to meet Navy Response Plan. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 21 of 42 P-1 Line #125 Volume 5 - 95 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 (53) (54) (55) (56) P-1 Line Item Number / Title: 6060 / Items less than $5 Million Aggregated Items Title: Items under $5 million Logistics support required for compliment of end items being procured above. This support provides Fleet training, data to enable with Organic and intermediate maintenance, and aids in preserving the life of equipment. Quantity increase is due to greater high demand in meeting critical mission requirements Increase to support Table of allowance requirements of Expeditionary units Acquisition support costs reflects government execution and oversight of the acquisition process, program management support, acquisition engineering and technical support, review and evaluation of design data, writing of contracts and Contract Data Requirements Lists (CDRL), contract deliverable monitoring, evaluation of Engineering Change Proposals (ECP), configuration control and quality assurance, status reports and technical briefings, collection of performance metrics, and all other support efforts directly related to the procurement and delivery of equipment. (57) (58) (59) (60) Quantity increase supports the replacement of the equipment that is beyond economical repair Quantity increase supports the replacement of the equipment that is beyond economical repair NSMA was unable to execute the prior year budget plans to acquire replacement tractors and trailers and acquire replacement equipment to meet lifecycle replacement needs. When NSMA was able to procure replacement vehicles we discovered our existing five-year budget plan did not adequately account for inflation spurred by COVID. As a result, NSMA was not able to procure equipment per schedule and because of this, NSMA could not afford the targeted number of tractors and trailers due to their increased cost. So, NSMA was forced to modify the procurement plan and purchase just tractors to upgrade our severely aging fleet of tractors. (61) (62) FY27 Cost increase is driven by a higher quantity requirement to fulfill mission critical requirements. Chassis trailers are required to transport ordnance laden ISO containers in support of MPF mission. Failure to routinely replace the trailer chassis has led to an inventory deficit. This deficit impacts operating efficiency and total cost of Fleet support; likelihood of mission failure is growing as trailers are taken out of service without replacement. (63) Maintenance Support Equipment (BSO 60): NECC N46 Equipment Procurement Funding Program for the procurement of specialized equipment used by NECC forces, but unsupported by a designated program office. This funding will provide NECC with procurement funds to support NECC facility modifications/infrastructures not covered under OMN or MILCON funding. (64) FY 2027 decrease due to miscellaneous rate adjustments and efficiencies gained with the vehicle manufacturer. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 22 of 42 P-1 Line #125 Volume 5 - 96 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 1.1) Expeditionary - Sweeper, Runway, Truck Mounted 2026 TBD / TBD C / TBD TBD Apr 2026 Apr 2026 9 390,150.00 N 1.2) Expeditionary - Trk Dump 10CY 2025 TBD / TBD C / TBD DLA May 2026 May 2027 1 261,700.00 Y 1.2) Expeditionary - Trk Dump 10CY 2026 TBD / TBD C / TBD DLA Sep 2026 Sep 2027 2 265,000.00 Y 1.3) Expeditionary - Trk Dump 10CY Asphalt 2026 Unknown / Unknown C / TBD ** NO PCO ** Jul 2026 Jul 2027 16 318,375.00 N 1.4) Expeditionary - Field Service Truck 2025 MACK DEFENSE / ALLENTOWN, PA MIPR DLA Sep 2025 Jun 2026 1 456,450.00 Y 2025 Mack Trucks / Allentown, PA MIPR DLA Aug 2025 Aug 2025 36 260,566.67 Y 2026 Mack Trucks / Allentown, PA MIPR DLA Oct 2025 Oct 2025 31 265,294.12 N 1.6) Expeditionary - Trk Tank Water Dist 3100 Gal 2025 TBD / TBD C / TBD ** NO PCO ** May 2026 May 2027 4 338,250.00 N Oct 2025 1.6) Expeditionary - Trk Tank Water Dist 3100 Gal 2026 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 6 345,015.00 N Oct 2025 2025 MACK DEFENSE / ALLENTOWN, PA MIPR DLA Aug 2025 Aug 2025 16 260,117.65 Y 2026 MACK DEFENSE / ALLENTOWN, PA MIPR DLA Oct 2025 Oct 2025 38 265,300.00 N 2027 TBD / TBD C / TBD ** NO PCO ** Feb 2027 Feb 2027 10 37,900.00 Y 1.9) Expeditionary - Trk, Util, Repair 2025 TBD / TBD C / TBD GSA May 2026 May 2027 16 37,416.67 N Oct 2025 1.9) Expeditionary - Trk, Util, Repair 2026 TBD / TBD C / TBD GSA Aug 2026 Aug 2027 8 38,222.22 N Oct 2025 1.10) Expeditionary - Trlr 60T Semi Lowbed Ded Hyd Rgn 2025 Pitts Trailers / Pittsview, AL MIPR GSA Oct 2024 Oct 2024 42 156,062.50 Y 1.10) Expeditionary - Trlr 60T Semi Lowbed Ded Hyd Rgn 2026 Unknown / Unknown C / TBD ** NO PCO ** Jul 2026 Jul 2026 10 158,840.91 Y 1.11) Expeditionary - Trlr Cargo 1 and Quarter Ton 2026 TBD / TBD C / TBD ** NO PCO ** Apr 2026 Apr 2026 11 31,844.44 N Oct 2025 1.12) Expeditionary - Trlr Enclosed 2 Axle 2T 2025 TBD / TBD C / TBD GSA May 2026 May 2027 2 27,500.00 N Oct 2025 1.12) Expeditionary - Trlr Enclosed 2 Axle 2T 2026 TBD / TBD C / TBD GSA Sep 2026 Sep 2027 3 28,000.00 N Oct 2025 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Special Purpose Vehicles - Expeditionary 1.5) Expeditionary - Stake Truck 30 Ton (1) 1.5) Expeditionary - Stake Truck 30 Ton (1) 1.7) Expeditionary - Trk Trac 160k GCW (2) 1.7) Expeditionary - Trk Trac 160k GCW (2) 1.8) Expeditionary - Trk Util Grounds Maint (3) LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 23 of 42 P-1 Line #125 Oct 2025 Volume 5 - 97 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 1.13) Expeditionary - Trlr Highbed Roller Conveyor 40ft Deck 20T 2025 TBD / TBD C / TBD DLA May 2026 May 2027 1 114,000.00 N Oct 2025 1.14) Expeditionary - Trlr Lowbed Heavy Haul 2025 Pitts Trailers / Pittsview, AL MIPR GSA Dec 2024 Dec 2024 6 468,333.33 N Dec 2023 1.14) Expeditionary - Trlr Lowbed Heavy Haul 2026 Unknown / Unknown C / TBD ** NO PCO ** May 2026 May 2026 11 477,500.00 Y 2026 TBD / TBD C / TBD ** NO PCO ** Jul 2026 Jul 2026 31 159,181.20 Y (4) 2027 TBD / TBD C / TBD ** NO PCO ** Jul 2027 Jul 2027 46 163,364.83 N 1.16) Expeditionary - Trlr Stake Breakbulk 34T 2024 VARIOIUS / VARIOUS MIPR GSA Oct 2024 Oct 2024 19 142,789.47 N Dec 2023 1.16) Expeditionary - Trlr Stake Breakbulk 34T 2025 VARIOIUS / VARIOUS MIPR GSA May 2025 May 2025 28 145,629.63 Y Dec 2023 1.16) Expeditionary - Trlr Stake Breakbulk 34T 2026 TBD / TBD C / TBD ** NO PCO ** Aug 2026 Aug 2026 84 148,571.43 Y 1.16) Expeditionary - Trlr Stake Breakbulk 34T 2027 VARIOIUS / VARIOUS C / TBD ** NO PCO ** Oct 2026 Oct 2026 47 152,346.94 N 1.17) Expeditionary - Trlr Tank Water Potable 400G 2026 TBD / TBD C / TBD ** NO PCO ** Apr 2026 Apr 2026 8 55,169.00 N Oct 2025 1.18) Expeditionary - Trlr Tilt Deck 2025 TBD / TBD C / TBD GSA May 2026 May 2027 4 18,750.00 N Oct 2025 1.19) Expeditionary - Skid Lubrication Unit 2025 TBD / TBD C / TBD DLA May 2026 May 2027 6 78,000.00 Y 1.20) Expeditionary - Skid Lubrication Unit M915 2024 SAGE OIL VAC / Amarillo, TX MIPR GSA Dec 2024 Dec 2024 2 86,500.00 N 1.20) Expeditionary - Skid Lubrication Unit M915 2025 SAGE OIL VAC / Amarillo, TX MIPR GSA Oct 2024 Oct 2024 4 88,230.00 Y 1.20) Expeditionary - Skid Lubrication Unit M915 2026 Unknown / Unknown C / TBD ** NO PCO ** Aug 2026 Aug 2026 5 89,995.00 Y 1.20) Expeditionary - Skid Lubrication Unit M915 2027 Unknown / Unknown C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 91,794.00 N 2027 TBD / TBD C / TBD ** NO PCO ** Jun 2027 Jun 2027 3 229,500.00 N Houston Freightliner Inc / HOUSTON, TX Reqn GSA Aug 2025 Aug 2026 7 82,618.00 Y Item Number / Title [DODIC] 1.15) Expeditionary - Trlr Lowbed Hyd Rgn 60T (4) 1.15) Expeditionary - Trlr Lowbed Hyd Rgn 60T 1.23) Expeditionary - TRLR Hydraulic Tail Winch 40T (5) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Dec 2023 Dec 2026 2) Special Purpose Vehicles (Alpha A-N) - PW 2.1) BSVE-0525-01, TRUCK, STAKE/FLT, 4X2,12-24FT, 25,000 GVWR, SIN 434 2025 LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 24 of 42 P-1 Line #125 Volume 5 - 98 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 2.1) BSVE-0525-01, TRUCK, STAKE/FLT, 4X2,12-24FT, 25,000 GVWR, SIN 434 2.1) BSVE-0525-01, TRUCK, STAKE/FLT, 4X2,12-24FT, 25,000 GVWR, SIN 434 2.2) BSVE-0525-02 4X2 STAKE/ FLAT BED, 9-22 FEET, 22000-24000 LBS GVWR (6) 2.2) BSVE-0525-02 4X2 STAKE/ FLAT BED, 9-22 FEET, 22000-24000 LBS GVWR (6) 2.3) BSVE-0525-03-TRUCK STAKE EXTENDED CAB 33,000LBS SIN 531 (7) 2.3) BSVE-0525-03-TRUCK STAKE EXTENDED CAB 33,000LBS SIN 531 (7) 2.3) BSVE-0525-03-TRUCK STAKE EXTENDED CAB 33,000LBS SIN 531 (7) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2026 Houston Freightliner Inc / HOUSTON, TX Reqn GSA Jul 2026 Jul 2027 2 84,270.00 Y Houston Freightliner Inc / HOUSTON, TX Reqn GSA Dec 2026 Dec 2027 2 85,790.00 Y HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Sep 2025 Sep 2026 5 74,200.00 Y HOUSTON FREIGHTLINER / HOUSETON, TX MIPR GSA May 2027 May 2028 2 77,198.00 Y 2025 Navistar, Inc. / Knoxville, TN Reqn GSA Jul 2025 May 2026 1 140,481.00 Y 2026 Navistar, Inc. / Knoxville, TN Reqn GSA Aug 2026 Jun 2027 4 143,347.00 Y Houston Freightliner Inc / HOUSTON, TX Reqn GSA Dec 2026 Dec 2026 2 146,214.00 Y 2027 (65) 2025 2027 2027 (66) (67) (Each) 2.4) BSVE-0527-01-TRUCK BOX/ VAN 12-22 FT BODY 16001 GVWR AND UP SIN 474 2025 Freightliner, LLC / Greensboro, NC Reqn GSA Jul 2025 Jul 2026 6 179,160.00 Y 2.4) BSVE-0527-01-TRUCK BOX/ VAN 12-22 FT BODY 16001 GVWR AND UP SIN 474 2026 Freightliner, LLC / Greensboro, NC Reqn GSA Aug 2026 Aug 2027 2 182,814.00 Y 2.4) BSVE-0527-01-TRUCK BOX/ VAN 12-22 FT BODY 16001 GVWR AND UP SIN 474 2.5) BSVE-0600-00, VEHICLE MISC HEAVY SPECIAL PURPOSE 16,001 GVWR (8) 2.6) BSVE-0603-01, TRUCK, STAKE/FLT, 4X2, 10-14FT, 19501 GVWR (9) 2.6) BSVE-0603-01, TRUCK, STAKE/FLT, 4X2, 10-14FT, 19501 GVWR (9) 2027 (68) FleetSide Ford, LLC / Osceola, IA Reqn GSA Dec 2026 Dec 2027 3 186,470.00 Y 2027 (69) HOUSTON FREIGHTLINER / HOUSTON, TX Reqn GSA Dec 2026 Sep 2027 2 95,780.00 Y FLEETSIDE FORD LLC / Osceola, IA Reqn GSA Aug 2026 Aug 2027 10 137,600.00 Y FLEETSIDE FORD LLC / Osceola, IA Reqn GSA Dec 2026 Dec 2027 3 140,420.00 Y 2026 2027 LI 6060 - Items less than $5 Million Navy (70) UNCLASSIFIED Page 25 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 99 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2.7) BSVE-0605-RH-TRUCK BOX/VAN 12-22 FT BODY 16001 GVWR 2025 International Business Machine Corporation / Bethesda, MD MIPR FEAD Yokosuka Dec 2025 Aug 2026 4 367,200.00 Y 2.7) BSVE-0605-RH-TRUCK BOX/VAN 12-22 FT BODY 16001 GVWR 2026 International Business Machine Corporation / Bethesda, MD MIPR FEAD Yokosuka Sep 2026 May 2027 4 374,544.00 Y 2025 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Jul 2025 Jul 2026 2 112,500.00 Y HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Dec 2026 Dec 2027 2 117,045.00 Y 2025 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Oct 2024 Oct 2025 1 265,252.00 Y 2026 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Aug 2026 Aug 2027 7 281,320.00 Y 2.8) BSVE-0614-00, TRUCK TRACTOR, 4X2, 50000-65000 GCWR (10) 2.8) BSVE-0614-00, TRUCK TRACTOR, 4X2, 50000-65000 GCWR (10) 2.9) BSVE-0616-00-TRUCK TRACTOR YARD SPOTTER NONSTANDARD (11) 2.9) BSVE-0616-00-TRUCK TRACTOR YARD SPOTTER NONSTANDARD (11) 2.9) BSVE-0616-00-TRUCK TRACTOR YARD SPOTTER NONSTANDARD (11) 2.10) BSVE 0630-01, 6X4 TRUCK TRACTOR, 43,000 LBS (12) 2027 (71) (Each) 2027 (72) HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Dec 2026 Dec 2027 1 283,220.00 Y 2027 (73) MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Dec 2026 Dec 2027 2 277,542.00 Y 2.11) BSVE-0636-00-TRUCK STAKE 6X4,14-28FT, 54,000-80,000LBS, GVWR, SIN 735 2026 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Aug 2026 Aug 2027 6 245,998.00 Y 2.12) BSVE-0636-01-TRK STAKE 6X4, 14-28 ft, 62,000-80,000 GVWR, 633/634 2025 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Dec 2025 Aug 2026 1 117,631.00 Y 2.12) BSVE-0636-01-TRK STAKE 6X4, 14-28 ft, 62,000-80,000 GVWR, 633/634 2026 CENTRAL KENWORTH / LANDOVER, MD Reqn GSA Aug 2026 Apr 2027 4 119,965.00 Y 2025 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Sep 2025 Sep 2026 3 93,133.00 Y 2026 HOUSTON FREIGHTLINER / HOUSETON, TX Reqn GSA Aug 2026 Aug 2027 3 95,000.00 Y 2.13) BSVE-0636-01 TRUCK, STAKE 4X4,12-26FT, 39,000 GVWR (13) 2.13) BSVE-0636-01 TRUCK, STAKE 4X4,12-26FT, 39,000 GVWR (13) LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 26 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 100 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2027 HOUSTON FREIGHTLINER / HOUSETON, TX MIPR GSA Dec 2026 Dec 2027 1 96,919.00 Y 2.14) BSVE-0644-00 DUMP TRUCK 6X6,12-14 CY, 54,000-60,000LBS GVWR SIN 844 2025 Navistar, Inc. / Knoxville, TN Reqn GSA Sep 2025 Jun 2026 12 208,663.00 Y 2.14) BSVE-0644-00 DUMP TRUCK 6X6,12-14 CY, 54,000-60,000LBS GVWR SIN 844 2026 Navistar, Inc. / Knoxville, TN Reqn GSA Aug 2026 May 2027 10 212,242.00 Y 2.15) BSVE-0645-00 TRACTOR HIGHWAY DAY CAB, 6X4, 100,000LBS GCWR SIN 625H lbs 2025 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Sep 2025 May 2026 2 141,500.00 Y 2.15) BSVE-0645-00 TRACTOR HIGHWAY DAY CAB, 6X4, 100,000LBS GCWR SIN 625H lbs 2026 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Aug 2026 Apr 2027 8 144,330.00 Y 2025 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Sep 2025 Jul 2026 12 183,789.00 Y 2026 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Aug 2026 Jun 2027 11 184,465.00 Y 2027 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Dec 2026 Oct 2027 1 189,877.00 Y 2026 CENTRAL KENWORTH / LANDOVER, MD Reqn GSA Sep 2026 Jun 2027 6 205,100.00 Y 2025 NAVISTAR International / Madison Heights, MI Reqn GSA Dec 2025 Dec 2026 1 167,963.00 Y 2027 MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Oct 2026 Oct 2027 3 174,732.00 Y 2025 CENTRAL KENWORTH / LANDOVER, MD Reqn DLA Sep 2025 Sep 2026 1 120,909.00 Y 2.13) BSVE-0636-01 TRUCK, STAKE 4X4,12-26FT, 39,000 GVWR (13) 2.16) BSVE-0645-01 TRUCK, STAKE/FLT 6X6 14-26FT 56,000-80,000LBS (14) 2.16) BSVE-0645-01 TRUCK, STAKE/FLT 6X6 14-26FT 56,000-80,000LBS (14) 2.16) BSVE-0645-01 TRUCK, STAKE/FLT 6X6 14-26FT 56,000-80,000LBS (14) 2.17) BSVE-0645-01 TRACTOR, HIGHWAY, 6X4, 90,000-95,000 GCWR, SIN 624H 2.18) BSVE-0649-00 6X4 LONGHAUL TRACTOR 6x4, 90,000-95,000LBS, GCWR, SIN 624S (15) 2.18) BSVE-0649-00 6X4 LONGHAUL TRACTOR 6x4, 90,000-95,000LBS, GCWR, SIN 624S (15) 2.19) BSVE-0649-00, 6X4 VOCATIONAL TRACTOR, 90000-95000LBS GCWR, SIN 625S (16) LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 27 of 42 (Each) P-1 Line #125 RFP Issue Date Volume 5 - 101 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 2.19) BSVE-0649-00, 6X4 VOCATIONAL TRACTOR, 90000-95000LBS GCWR, SIN 625S O O C FY 2027 (74) (16) P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle HOUSTON FREIGHTLINER / HOUSTON, TX Contractor and Location Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Reqn DLA Dec 2026 Dec 2027 2 125,794.00 Y Qty (Each) 2.20) BSVE-0649-01-TRACTOR, 6X4, 80,000LBS GCWR SIN 625H 2025 HOUSTON FREIGHTLINER / HOUSTON, TX Reqn GSA Sep 2025 Sep 2025 1 245,071.00 Y 2.20) BSVE-0649-01-TRACTOR, 6X4, 80,000LBS GCWR SIN 625H 2026 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Jul 2026 Jan 2027 2 249,972.00 Y 2.20) BSVE-0649-01-TRACTOR, 6X4, 80,000LBS GCWR SIN 625H 2027 MACK DEFENSE / ALLENTOWN, PA Reqn GSA Dec 2026 Jun 2027 2 254,971.44 Y 2.21) BSVE-0704-01-TRUCK AMMO WITH HYDRAULIC CRANE 16001 GVWR AND UP 2025 Altec Industries / Birmingham, AL MIPR DLA Aug 2025 Aug 2025 4 263,550.00 Y 2.21) BSVE-0704-01-TRUCK AMMO WITH HYDRAULIC CRANE 16001 GVWR AND UP 2026 Altec Industries / Birmingham, AL MIPR DLA Sep 2026 Sep 2026 2 268,821.00 Y Altec Industries / Birmingham, AL MIPR DLA Dec 2026 Dec 2026 2 261,800.00 Y Skymark Refuelers, LLC / Kansas City, KS Reqn DLA Jul 2026 Jul 2026 1 230,144.00 Y Skymark Refuelers, LLC / Kansas City, KS Reqn DLA Oct 2026 Oct 2026 2 232,500.00 Y 2026 Skymark Refuelers, LLC / Kansas City, KS MIPR DLA Aug 2026 Aug 2026 1 201,000.00 Y 2025 Altec Industries, Inc. / Birmingham,AL Reqn DLA Sep 2025 Nov 2026 3 382,574.00 Y 2026 Altec Industries, Inc. / Birmingham,AL Reqn DLA Aug 2026 Aug 2026 2 390,225.00 Y Altec Industries, Inc. / Birmingham,AL Reqn DLA Oct 2026 Dec 2027 4 398,030.00 Y 2.21) BSVE-0704-01-TRUCK AMMO WITH HYDRAULIC CRANE 16001 GVWR AND UP 2.22) BSVE-0710-00/01- TRUCK FIELD SERVICING 24,000 GVWR 2.22) BSVE-0710-00/01- TRUCK FIELD SERVICING 24,000 GVWR 2.23) BSVE-0714-00 TRUCK TIRE SERVICING 4X2 28000 GVWR 2.24) BSVE-0723-00/01-TRUCK MAINTENANCE POLE LINE W/ ROTATING HYD DERRICK (17) 2.24) BSVE-0723-00/01-TRUCK MAINTENANCE POLE LINE W/ ROTATING HYD DERRICK (17) 2.24) BSVE-0723-00/01-TRUCK MAINTENANCE POLE LINE W/ ROTATING HYD DERRICK (17) 2027 (75) 2026 2027 2027 (76) (77) 2.25) BSVE-0725-01/03/07 TRUCK MAINTENANCE OVERHEAD AERIAL SERVICE 2025 Altec Industries, Inc. / Birmingham,AL MIPR DLA Sep 2025 Sep 2026 1 219,000.00 Y 2.25) BSVE-0725-01/03/07 TRUCK MAINTENANCE OVERHEAD AERIAL SERVICE 2026 Altec Industries, Inc. / Birmingham,AL Reqn DLA Aug 2026 Aug 2027 4 222,600.00 Y LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 28 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 102 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 2.25) BSVE-0725-01/03/07 TRUCK MAINTENANCE OVERHEAD AERIAL SERVICE 2.26) BSVE-0725-RH-TRUCK MOUNTED OVERHEAD AERIAL SERVICE RHD 2.27) BSVE-0729-00, WRECKER, 8T, RECOVERY BOOM, SIN 972 (18) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Contractor and Location Method/Type or Funding Vehicle Altec Industries, Inc. / Birmingham,AL 2025 2025 FY 2027 (78) Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Reqn DLA Nov 2026 Nov 2027 5 230,000.00 Y Futurebud Intl / Chuo-Ku, Japan C / FFP FEAD Yokosuka Sep 2025 Sep 2025 1 136,094.00 Y TRUCK COUNTRY OF WISCONSIN / KAUKAUNA, WI Reqn GSA Sep 2025 Sep 2025 1 172,000.00 Y Qty (Each) 2.27) BSVE-0729-00, WRECKER, 8T, RECOVERY BOOM, SIN 972 2027 (79) TRUCK COUNTRY OF WISCONSIN / KAUKAUNA, WI Reqn GSA Dec 2026 Sep 2027 3 177,514.00 Y 2.28) BSVE-0729-01 WRECKER, 12T, IND RECOVERY BOOM AND 2027 (80) MACK DEFENSE / ALLENTOWN, PA Reqn GSA Oct 2026 Jul 2027 2 176,900.00 Y NAVISTAR International / Madison Heights, MI Reqn GSA Sep 2025 Sep 2026 1 134,114.00 Y (18) UNDERLIFT, SIN 973 (19) 2.29) BSVE-0729-02/03 WRECKER, 16T, INTEGRATED RECOVERY BOOM UNDERLIFT 2.29) BSVE-0729-02/03 WRECKER, 16T, INTEGRATED RECOVERY BOOM UNDERLIFT 2.30) BSVE-0735-00 THREE REEL HANDLING/TENSIONING POWERED (20) 2.31) BSVE-0751-00/01-TRUCK TANK FUEL SERVICING 1 SYSTEM 1 TANK (21) 2.31) BSVE-0751-00/01-TRUCK TANK FUEL SERVICING 1 SYSTEM 1 TANK (21) 2.32) BSVE-0751-02-TRUCK TANK FUEL SERVICING 2 SYSTEM 2 TANK (22) 2025 2027 (81) NAVISTAR International / Madison Heights, MI Reqn GSA Oct 2026 Oct 2027 1 138,260.00 Y 2027 (82) Altec Industries, Inc. / Birmingham,AL MIPR DLA Dec 2026 Dec 2028 2 229,626.00 Y WESTMARK / CERES, CA Reqn DLA Sep 2025 Sep 2026 2 387,219.00 Y 2025 2027 (83) WESTMARK / CERES, CA Reqn DLA Dec 2026 Dec 2027 2 421,550.00 Y 2027 (84) WESTMARK / CERES, CA Reqn DLA Oct 2026 Oct 2026 3 302,902.00 Y 2.33) BSVE-0756-00-TRUCK TANK AVGAS/JETFUEL 5000-7000 GALLON 2025 WESTMARK / CERES, CA Reqn DLA Sep 2025 Sep 2026 3 196,736.00 Y 2.33) BSVE-0756-00-TRUCK TANK AVGAS/JETFUEL 5000-7000 GALLON 2026 Skymark Refuelers, LLC / Kansas City, KS Reqn DLA Aug 2026 Aug 2027 5 200,670.00 Y LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 29 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 103 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 2.34) BSVE-0756-01/02/03 TRUCK TANK AVGAS/JETFUEL 10,000 GALLON 2025 WESTMARK / CERES, CA Reqn DLA Sep 2025 Sep 2026 6 327,495.00 Y 2.34) BSVE-0756-01/02/03 TRUCK TANK AVGAS/JETFUEL 10,000 GALLON 2026 WESTMARK / CERES, CA Reqn DLA Jul 2026 Jul 2026 6 333,443.00 Y 2025 WESTMARK / CERES, CA MIPR DLA Sep 2025 Sep 2025 1 223,730.00 Y WESTMARK / CERES, CA MIPR DLA Oct 2026 Oct 2027 1 228,205.00 Y 2025 GLOBE TRAILER / Bradenton, FL Reqn GSA Jul 2025 May 2026 3 9,363.00 Y 2026 GLOBE TRAILER / Bradenton, FL Reqn GSA Aug 2026 Aug 2026 4 9,551.00 Y GLOBE TRAILER / Bradenton, FL Reqn GSA Oct 2026 Oct 2026 1 9,742.00 Y 2025 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA Reqn GSA Jul 2025 Jul 2026 3 37,025.00 Y 2026 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA Reqn GSA Jul 2026 Jul 2026 1 37,773.00 Y 2027 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA Reqn GSA Oct 2026 Oct 2026 5 38,528.46 Y 3.3) BSVE-0816-01 SEMITRAILER STAKE 20 TON 40FT W/O STAKES 2025 American Material Handling / Watkinsville, GA Reqn DLA Sep 2025 Sep 2025 2 116,744.00 Y 3.3) BSVE-0816-01 SEMITRAILER STAKE 20 TON 40FT W/O STAKES 2026 Global Enterprise, Inc. / Springfield, VA Reqn GSA Jul 2026 Jul 2026 5 119,078.00 Y Item Number / Title [DODIC] 2.35) BSVE-0758-00-TRUCK TANK WATER (DRINKING WATER) 2000-2999 GALLON NONSTD Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date (23) 2.35) BSVE-0758-00-TRUCK TANK WATER (DRINKING WATER) 2000-2999 GALLON NONSTD O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million 2027 (85) (23) 3) Special Purpose Trailers (Alpha Code P) - PW 3.1) BSVE-0800/0805 TRAILER SPECIAL PURPOSE NONSTANDARD (24) 3.1) BSVE-0800/0805 TRAILER SPECIAL PURPOSE NONSTANDARD (24) 3.1) BSVE-0800/0805 TRAILER SPECIAL PURPOSE NONSTANDARD (24) 3.2) BSVE-0816-00-SEMITRAILER STAKE 2-3 AXLE 20 TON WITHOUT STAKES (25) 3.2) BSVE-0816-00-SEMITRAILER STAKE 2-3 AXLE 20 TON WITHOUT STAKES (25) 3.2) BSVE-0816-00-SEMITRAILER STAKE 2-3 AXLE 20 TON WITHOUT STAKES (25) 2027 LI 6060 - Items less than $5 Million Navy (86) UNCLASSIFIED Page 30 of 42 P-1 Line #125 Volume 5 - 104 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 3.3) BSVE-0816-01 SEMITRAILER STAKE 20 TON 40FT W/O STAKES 3.4) BSVE-0816-02-SEMITRAILER STAKE 2-3 AXLE 20 TON 40-55 FT WITH STAKES (26) 3.4) BSVE-0816-02-SEMITRAILER STAKE 2-3 AXLE 20 TON 40-55 FT WITH STAKES (26) 3.4) BSVE-0816-02-SEMITRAILER STAKE 2-3 AXLE 20 TON 40-55 FT WITH STAKES (26) 3.5) BSVE-0817-00-SEMITRAILER VAN 2 AXLE NONSTANDARD 3.5) BSVE-0817-00-SEMITRAILER VAN 2 AXLE NONSTANDARD O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 2027 Global Enterprise, Inc. / Springfield, VA Reqn GSA Oct 2026 Oct 2026 6 121,292.00 Y 2025 CONSOLIDATED TRAILERS INC / BALTIMORE, MD MIPR GSA Sep 2025 Sep 2026 3 62,232.00 Y 2026 CONSOLIDATED TRAILERS INC / BALTIMORE, MD MIPR GSA Aug 2026 Aug 2026 3 65,400.00 Y 2027 CONSOLIDATED TRAILERS INC / BALTIMORE, MD MIPR GSA Oct 2026 Oct 2026 5 66,708.00 Y 2025 Consolidated Trailers, INC / Baltimore, MD Reqn GSA Sep 2025 Sep 2026 2 78,240.00 Y Consolidated Trailers, INC / Baltimore, MD Reqn GSA Oct 2026 Oct 2027 1 81,401.00 Y 2027 (87) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 3.6) BSVE-0817-01-SEMITRAILER VAN 2 AXLE 20 TON UP TO 55 FT 2026 Global Enterprise, Inc. / Springfield, VA Reqn GSA Aug 2026 Aug 2027 2 115,000.00 Y 3.6) BSVE-0817-01-SEMITRAILER VAN 2 AXLE 20 TON UP TO 55 FT 2027 Global Enterprise, Inc. / Springfield, VA Reqn GSA Oct 2026 Oct 2026 2 118,320.00 Y 3.7) BSVE-0820-01-SEMITRAILER VAN REFRIGERATOR 2 AXLE 20 TON 40-55 FT 2025 Consolidated Trailers, INC / Baltimore, MD Reqn DLA Sep 2025 Sep 2025 7 116,477.00 Y Consolidated Trailers, INC / Baltimore, MD Reqn DLA Oct 2026 Oct 2027 2 121,163.00 Y 2025 MERICAN MATERIAL HANDLING, INC. / WATKINSVILLE, GA Reqn DLA Sep 2025 Sep 2026 1 163,500.00 Y 2027 MERICAN MATERIAL HANDLING, INC. / WATKINSVILLE, GA Reqn DLA Oct 2026 Oct 2026 1 170,105.00 Y AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA Reqn DLA Oct 2026 Oct 2027 1 34,583.00 Y 3.7) BSVE-0820-01-SEMITRAILER VAN REFRIGERATOR 2 AXLE 20 TON 40-55 FT 3.8) BSVE-0821-00-SEMITRAILER LOWBED 4 WHEEL NONSTANDARD (27) 3.8) BSVE-0821-00-SEMITRAILER LOWBED 4 WHEEL NONSTANDARD (27) 3.9) BSVE-0822-01-SEMITRAILER DROP DECK 2 AXLE 20 TON 2027 2027 (88) (89) 3.10) BSVE-0825-00SEMITRAILER LOWBED 2 AXLE 35 TON NONSTD 2025 American Material Handling / Watkinsville, GA MIPR DLA Sep 2025 Mar 2026 1 71,134.00 Y 3.10) BSVE-0825-00SEMITRAILER LOWBED 2 AXLE 35 TON NONSTD 2026 American Material Handling / Watkinsville, GA MIPR DLA Jul 2026 Jan 2027 3 72,557.00 Y LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 31 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 105 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 3.10) BSVE-0825-00SEMITRAILER LOWBED 2 AXLE 35 TON NONSTD 2027 American Material Handling / Watkinsville, GA MIPR DLA Oct 2026 Apr 2027 3 74,008.00 Y 3.11) BSVE-0825-01SEMITRAILER LOWBED 3 AXLE 35 TON 2025 American Material Handling / Watkinsville, GA MIPR DLA Sep 2025 Sep 2026 4 42,500.00 Y AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA Reqn DLA Oct 2026 Oct 2027 2 93,840.00 Y Globe Trailers / Bradenton, FL Reqn DLA Sep 2025 Sep 2026 3 43,000.00 Y Globe Trailers / Bradenton, FL Reqn DLA Dec 2026 Dec 2027 2 44,440.00 Y GLOBE TRAILER / Bradenton, FL Reqn DLA Sep 2025 Jul 2026 4 104,366.00 Y GLOBE TRAILER / Bradenton, FL Reqn DLA Jan 2027 Nov 2027 2 109,565.00 Y 3.12) BSVE 0826-00 STEP DECK TRAILER W/ RAMPS (28) 3.13) BSVE-0826-01SEMITRAILER LOWBED 3 AXLE 50 TON 3.13) BSVE-0826-01SEMITRAILER LOWBED 3 AXLE 50 TON 3.14) BSVE-0826-02SEMITRAILER LOWBED 3 AXLE DETACHABLE GOOSENECK 3.14) BSVE-0826-02SEMITRAILER LOWBED 3 AXLE DETACHABLE GOOSENECK 2027 (90) 2025 2027 (91) 2025 2027 (92) (Each) 3.15) BSVE-0827-00SEMITRAILER LOWBED 3 AXLE 60 TON NONSTD 2025 GLOBE TRAILER / Bradenton, FL Reqn GSA Sep 2025 Sep 2025 2 70,180.00 Y 3.15) BSVE-0827-00SEMITRAILER LOWBED 3 AXLE 60 TON NONSTD 2026 GLOBE TRAILER / Bradenton, FL Reqn GSA Aug 2026 Aug 2026 4 72,296.00 Y 3.15) BSVE-0827-00SEMITRAILER LOWBED 3 AXLE 60 TON NONSTD 2027 GLOBE TRAILER / Bradenton, FL Reqn GSA Oct 2026 Oct 2026 3 73,200.00 Y 2026 GLOBE TRAILER / Bradenton, FL Reqn DLA Aug 2026 Aug 2026 2 60,180.00 Y 3.16) BSVE-0827-01SEMITRAILER LOWBED 3 AXLE 60 TON (29) 3.16) BSVE-0827-01SEMITRAILER LOWBED 3 AXLE 60 TON (29) 3.17) BSVE-0832-00-TRAILER HYDRAULIC ELEVATING BODY NONSTD 3.18) BSVE-0832-01/02/03 TRAILER LOWBED UP TO 18000 GVWR STATIONARY AXLE 2027 (93) GLOBE TRAILER / Bradenton, FL Reqn DLA Dec 2026 Dec 2027 4 62,888.10 Y 2027 (94) Global Enterprise, Inc. / Springfield, VA Reqn GSA Nov 2026 Nov 2027 2 20,533.62 Y Globe Trailer Manufacturing / Bradenton, FL Reqn DLA Sep 2025 Sep 2026 2 77,025.00 Y 2025 LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 32 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 106 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 3.18) BSVE-0832-01/02/03 TRAILER LOWBED UP TO 18000 GVWR STATIONARY AXLE 2026 Globe Trailer Manufacturing / Bradenton, FL Reqn GSA Jul 2026 Jul 2026 2 78,580.00 Y 3.18) BSVE-0832-01/02/03 TRAILER LOWBED UP TO 18000 GVWR STATIONARY AXLE 2027 Globe Trailer Manufacturing / Bradenton, FL Reqn GSA Oct 2026 Oct 2026 3 80,168.00 Y 2025 Globe Trailer Manufacturing / Bradenton, FL MIPR DLA Sep 2025 Sep 2025 4 56,110.00 Y 2026 Globe Trailer Manufacturing / Bradenton, FL Reqn GSA Aug 2026 Aug 2026 4 57,244.00 Y 2027 Globe Trailer Manufacturing / Bradenton, FL MIPR GSA Nov 2026 Nov 2026 2 58,400.00 Y GLOBE TRAILER / Bradenton, FL Reqn GSA Oct 2026 Jul 2027 2 61,000.00 Y 3.19) BSVE-0832-04SEMITRAILER DROP DECK 20 TON HYDRAULIC RAMP WITH WINCH (30) 3.19) BSVE-0832-04SEMITRAILER DROP DECK 20 TON HYDRAULIC RAMP WITH WINCH (30) 3.19) BSVE-0832-04SEMITRAILER DROP DECK 20 TON HYDRAULIC RAMP WITH WINCH (30) 3.20) BSVE-0848-00/01/02 TRAILER OR SEMITRAILER DUMP REFUSE 2027 (95) (Each) 3.21) BSVE-0862-00/01 TRAILER LOWBED TILT DECK TANDEM AXLE 2025 Globe Trailers / Bradenton, FL Reqn DLA Sep 2025 Sep 2026 3 39,198.00 Y 3.21) BSVE-0862-00/01 TRAILER LOWBED TILT DECK TANDEM AXLE 2026 Globe Trailers / Bradenton, FL Reqn DLA Aug 2026 Aug 2026 2 39,982.00 Y 3.21) BSVE-0862-00/01 TRAILER LOWBED TILT DECK TANDEM AXLE 2027 Globe Trailers / Bradenton, FL Reqn DLA Dec 2026 Dec 2026 2 40,781.00 N 3.24) BSVE-0892-00SEMITRAILER TANK 6000 GALLON AND UP NONSTANDARD 2025 WESTMARK / CERES, CA MIPR DLA Aug 2025 Aug 2026 1 213,648.00 Y 3.24) BSVE-0892-00SEMITRAILER TANK 6000 GALLON AND UP NONSTANDARD 2026 WESTMARK / CERES, CA Reqn DLA Jun 2026 Jun 2026 2 217,920.00 N WESTMARK / CERES, CA Reqn DLA Nov 2026 Nov 2026 3 222,278.00 Y 3.24) BSVE-0892-00SEMITRAILER TANK 6000 GALLON AND UP NONSTANDARD 2027 LI 6060 - Items less than $5 Million Navy (96) UNCLASSIFIED Page 33 of 42 P-1 Line #125 RFP Issue Date Volume 5 - 107 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 4.1) BSVE-0905-00-LOW SPEED VEHICLE 2 PASSENGER 2025 VANTAGE / Corona, CA Reqn DLA Sep 2025 Sep 2025 12 16,333.00 Y 4.1) BSVE-0905-00-LOW SPEED VEHICLE 2 PASSENGER 2026 VANTAGE / Corona, CA Reqn DLA Jul 2026 Jul 2026 6 16,663.00 Y 4.1) BSVE-0905-00-LOW SPEED VEHICLE 2 PASSENGER 2027 VANTAGE / Corona, CA Reqn DLA Oct 2026 Oct 2026 6 17,173.00 Y 2025 Polaris GEM / COLUMBUS, OH Reqn DLA Oct 2025 Apr 2026 5 40,800.00 Y 2027 Polaris GEM / COLUMBUS, OH Reqn DLA Oct 2026 Oct 2026 5 41,848.00 Y 2025 VANTAGE / Corona, CA Reqn GSA Nov 2025 May 2026 6 26,630.00 Y 2027 VANTAGE / Corona, CA Reqn GSA Oct 2026 Oct 2026 6 27,000.00 Y 4.4) BSVE-0905-03-LOW SPEED VEHICLE 6 PASSENGER VAN 2025 VANTAGE / Corona, CA Reqn DLA Sep 2025 Sep 2026 7 30,055.00 Y 4.4) BSVE-0905-03-LOW SPEED VEHICLE 6 PASSENGER VAN 2026 VANTAGE / Corona, CA Reqn DLA Jul 2026 Jul 2026 3 30,400.00 Y 4.4) BSVE-0905-03-LOW SPEED VEHICLE 6 PASSENGER VAN 2027 VANTAGE / Corona, CA MIPR GSA Oct 2026 Oct 2026 3 31,008.00 Y 2025 VANTAGE / Corona, CA Reqn DLA Nov 2025 Nov 2025 4 36,720.00 Y 2026 VANTAGE / Corona, CA Reqn DLA Jun 2026 Jun 2026 4 37,454.00 Y 2027 VANTAGE / Corona, CA Reqn DLA Oct 2026 Oct 2026 6 37,703.00 Y 2025 VANTAGE / Corona, CA Reqn DLA Sep 2025 Mar 2026 3 33,700.00 Y 2026 VANTAGE / Corona, CA Reqn DLA Jul 2026 Jul 2026 2 34,000.00 Y 2027 VANTAGE / Corona, CA Reqn DLA Oct 2026 Oct 2026 6 34,686.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4) Low Speed Vehicles (Alpha Code Q) - PW 4.2) BSVE-0905-01-LOW SPEED VEHICLE 2 PASSENGER (32) 4.2) BSVE-0905-01-LOW SPEED VEHICLE 2 PASSENGER (32) 4.3) BSVE-0905-02-LOW SPEED VEHICLE 4 PASSENGER (33) 4.3) BSVE-0905-02-LOW SPEED VEHICLE 4 PASSENGER (33) 4.5) BSVE-0905-04 LOW SPEED VEHICLE 2 PASSENGER W/ FLATBED (34) 4.5) BSVE-0905-04 LOW SPEED VEHICLE 2 PASSENGER W/ FLATBED (34) 4.5) BSVE-0905-04 LOW SPEED VEHICLE 2 PASSENGER W/ FLATBED (34) 4.6) BSVE-0905-05 LOW SPEED VEHICLE, CARGO VAN (35) 4.6) BSVE-0905-05 LOW SPEED VEHICLE, CARGO VAN (35) 4.6) BSVE-0905-05 LOW SPEED VEHICLE, CARGO VAN (35) 5) Special Purpose- Vacuum, Sweepers, Refuse (Alpha Code S) - PW LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 34 of 42 P-1 Line #125 Volume 5 - 108 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 5.1) BSVE-5408-02-CLEANER VACUUM SELF-PROPELLED AIRFIELD 2025 Atlantic Machinery Inc. / Silver Spring, MD MIPR DLA Sep 2025 Sep 2026 1 472,188.00 Y 5.1) BSVE-5408-02-CLEANER VACUUM SELF-PROPELLED AIRFIELD 2026 Atlantic Machinery Inc. / Silver Spring, MD MIPR DLA Aug 2026 Aug 2026 1 476,321.00 Y 5.1) BSVE-5408-02-CLEANER VACUUM SELF-PROPELLED AIRFIELD 2027 Atlantic Machinery Inc. / Silver Spring, MD MIPR DLA Dec 2026 Dec 2026 1 482,371.00 Y 5.2) BSVE-5409-00-CLEANER BASIN/MANHOLE VACUUM/HYD TRK MTD 2025 Atlantic Machinery Inc. / Silver Spring, MD Reqn DLA Sep 2025 Sep 2026 2 471,240.00 Y 5.2) BSVE-5409-00-CLEANER BASIN/MANHOLE VACUUM/HYD TRK MTD 2026 Atlantic Machinery Inc. / Silver Spring, MD Reqn DLA Aug 2026 Aug 2026 2 480,851.00 Y 5.2) BSVE-5409-00-CLEANER BASIN/MANHOLE VACUUM/HYD TRK MTD 2027 Atlantic Machinery Inc. / Silver Spring, MD Reqn DLA Oct 2026 Oct 2026 1 490,564.00 Y 5.3) BSVE-5414-00-CLEANER SEPTIC TANK/CESSPOOL TRK MTD NONSTD 2025 WESTMARK / CERES, CA MIPR DLA Jan 2026 Jan 2027 1 529,180.00 Y 5.4) BSVE-5414-01-CLEANER SEWAGE/WASTE COLLECTION 1300 GALLON 2025 WESTMARK / CERES, CA Reqn DLA Dec 2025 Feb 2027 3 227,341.66 Y 5.4) BSVE-5414-01-CLEANER SEWAGE/WASTE COLLECTION 1300 GALLON 2026 WESTMARK / CERES, CA Reqn DLA Jul 2026 Jul 2026 3 231,337.00 Y 5.4) BSVE-5414-01-CLEANER SEWAGE/WASTE COLLECTION 1300 GALLON 2027 WESTMARK / CERES, CA Reqn DLA Oct 2026 Oct 2026 2 235,963.74 Y 2025 DUCO, LLC / EASTON, MD Reqn DLA Dec 2025 Jun 2026 3 51,700.00 Y 2026 DUCO, LLC / EASTON, MD Reqn DLA Jun 2026 Dec 2026 5 52,740.00 Y DUCO, LLC / EASTON, MD Reqn DLA Nov 2026 May 2027 1 53,795.00 Y 5.5) BSVE-5416-00-CLEANER PIPE/SEWER WATER JET TRUCK MOUNTED NONSTANDARD (36) 5.5) BSVE-5416-00-CLEANER PIPE/SEWER WATER JET TRUCK MOUNTED NONSTANDARD (36) 5.5) BSVE-5416-00-CLEANER PIPE/SEWER WATER JET TRUCK MOUNTED NONSTANDARD (36) 2027 LI 6060 - Items less than $5 Million Navy (97) UNCLASSIFIED Page 35 of 42 (Each) P-1 Line #125 RFP Issue Date Volume 5 - 109 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 5.6) BSVE-5416-01-CLEANER PIPE/SEWER WATER JET TRUCK MOUNTED (37) 5.6) BSVE-5416-01-CLEANER PIPE/SEWER WATER JET TRUCK MOUNTED (37) 5.7) BSVE-5720-01-SWEEPER VACUUM STREET SELFPROPELLED (38) 5.7) BSVE-5720-01-SWEEPER VACUUM STREET SELFPROPELLED (38) 5.8) BSVE-5831/5833-00-TRUCK MATERIAL HANDLING CHAIN/ CABLE HOIST/HAUL (39) 5.8) BSVE-5831/5833-00-TRUCK MATERIAL HANDLING CHAIN/ CABLE HOIST/HAUL (39) 5.9) BSVE-5833-01-TRUCK MATERIAL HANDLING HOIST/HAUL UP TO 45 CY NONSTANDARD (41) 5.10) BSVE-5835-00/01-TRUCK REFUSE FRONT LOAD WITH FORK 35 CY (41) 5.10) BSVE-5835-00/01-TRUCK REFUSE FRONT LOAD WITH FORK 35 CY (41) Contractor and Location 2025 DUCO, LLC / EASTON, MD Reqn DLA Dec 2025 Feb 2027 4 480,420.00 Y 2027 DUCO, LLC / EASTON, MD Reqn DLA Oct 2026 Oct 2026 2 499,829.00 Y 2025 Atlantic Machinery Inc. / Silver Spring, MD MIPR DLA Dec 2025 Dec 2025 5 249,847.00 Y Atlantic Machinery Inc. / Silver Spring, MD MIPR DLA Dec 2026 Dec 2027 2 259,631.00 Y MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Nov 2025 Oct 2026 3 171,501.00 Y MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Oct 2026 Sep 2027 2 179,505.00 Y 2025 WESTMARK-1 / CERES, CA Reqn DLA Nov 2025 Nov 2025 4 251,234.00 Y 2026 WESTMARK-1 / CERES, CA Reqn DLA Aug 2026 Aug 2026 1 256,059.00 Y 2027 WESTMARK-1 / CERES, CA Reqn DLA Dec 2026 Dec 2026 3 260,000.00 Y 2025 MARYLAND INDUSTRIAL TRUCKS, INC. / LINTHICUM HEIGHTS, MD Reqn GSA Nov 2025 Nov 2025 2 361,584.00 Y 2026 MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Jun 2026 Jun 2026 4 368,815.00 Y 2027 MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Nov 2026 Nov 2026 1 376,411.00 Y 2027 (98) 2025 2027 (99) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date (40) 5.10) BSVE-5835-00/01-TRUCK REFUSE FRONT LOAD WITH FORK 35 CY FY Method/Type or Funding Vehicle (40) 5.9) BSVE-5833-01-TRUCK MATERIAL HANDLING HOIST/HAUL UP TO 45 CY NONSTANDARD Aggregated Items: Items under $5 million (40) 5.9) BSVE-5833-01-TRUCK MATERIAL HANDLING HOIST/HAUL UP TO 45 CY NONSTANDARD O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 36 of 42 P-1 Line #125 Volume 5 - 110 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Contractor and Location Method/Type or Funding Vehicle 2025 Nordco / Beacon Falls, CT 2026 2027 FY Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) MIPR Volpe Center Dec 2025 Dec 2025 16 300,670.00 Y Nordco / Beacon Falls, CT MIPR Volpe Center Sep 2026 Sep 2026 21 308,000.00 Y Nordco / Beacon Falls, CT MIPR Volpe Center Jan 2027 Jan 2027 4 354,666.00 Y Nordco Rail Services / Beacon Falls, CT MIPR Volpe Center Oct 2026 Oct 2026 9 2,521K Y Qty (Each) RFP Issue Date 6) NTVE SIOP- Railway Equipment (Alpha V/W) - PW 6.1) BSVE-6110-00-CAR RAILWAY BOX (42) 6.1) BSVE-6110-00-CAR RAILWAY BOX (42) 6.1) BSVE-6110-00-CAR RAILWAY BOX (42) 7) NTVE BSO 60 NMC RAILWAY EQUIPMENT 7.1) BSVE-6540-00-LOCOMOTIVE RAILROAD 60-69 TON (43) 2027 9) COMBAT CONSTRUCTION SUPPORT EQUIPMENT - Expeditionary 9.1) Expeditionary - ADR LWPS 2025 TBD / TBD C / TBD ARMY May 2026 May 2026 6 179,500.00 N 2025 VARIOUS / VARIOUS MIPR McCalister Sep 2025 Mar 2026 5 7,200.00 Y 2027 VARIOUS / VARIOUS MIPR McCalister Oct 2026 Oct 2026 8 17,459.00 Y 9.4) Expeditionary - Battalion Aid Station 2025 DEPOT / Letter Kenny MIPR Letter Kenny Dec 2024 Dec 2024 6 455,000.00 N 9.4) Expeditionary - Battalion Aid Station 2026 Unknown / Unknown C / TBD ** NO PCO ** Aug 2026 Aug 2026 1 464,100.00 N 9.5) Expeditionary - Berthing, Integrated, 4 Tent Configuration, w/ Power 2025 Letterkenney, Army Depot / Chambersburg, PA MIPR ARMY Jul 2025 Jul 2025 12 648,461.54 Y 9.5) Expeditionary - Berthing, Integrated, 4 Tent Configuration, w/ Power 2026 Letterkenney, Army Depot / Chambersburg, PA MIPR ARMY Oct 2025 Oct 2025 1 681,000.00 N 9.6) Expeditionary - Command Operations Center, Small 2025 VARIOUS / VARIOUS MIPR ARMY Sep 2025 Sep 2025 1 620,000.00 Y 9.6) Expeditionary - Command Operations Center, Small 2026 VARIOUS / VARIOUS MIPR ARMY Apr 2026 Apr 2026 1 651,000.00 N 2025 MainstreamEngineering Corporation / Rockledge FL MIPR DLA Aug 2025 Aug 2025 13 10,459.46 Y 2026 MainstreamEngineering Corporation / Rockledge FL MIPR DLA Apr 2026 Apr 2026 16 10,668.00 Y 2025 MILSTRIP / DLA MIPR DLA Aug 2025 Aug 2025 8 14,375.00 Y 125 GPH (44) 9.3) Expeditionary - ADR Tank Fabric Onion (46) 9.3) Expeditionary - ADR Tank Fabric Onion (46) 9.7) Expeditionary - Containers 9.7) Expeditionary - Containers 9.8) Expeditionary - Diagnostic Tool Kit, Various LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 37 of 42 P-1 Line #125 Oct 2025 Dec 2023 Volume 5 - 111 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 9.8) Expeditionary - Diagnostic Tool Kit, Various 2026 MILSTRIP / DLA MIPR DLA Apr 2026 Apr 2026 6 9,166.67 Y 9.9) Expeditionary - Enhanced Production Module, LWPS 2025 Letterkenney, Army Depot / Chambersburg, PA MIPR ARMY Dec 2024 Dec 2024 2 93,500.00 Y 2025 Army / Letter Kenny MIPR Army Aug 2025 Aug 2025 2 114,500.00 Y 9.11) Expeditionary - Shower System 2025 Army / Letter Kenny MIPR Army Aug 2025 Aug 2025 4 114,500.00 Y 9.11) Expeditionary - Shower System 2026 Army / Letter Kenny MIPR Army Apr 2026 Apr 2026 5 116,750.00 N 2025 Prime Vendor / DLA C / IDDQ DLA Aug 2025 Aug 2025 2 114,500.00 N 9.14) Expeditionary - LSA Adapter 2025 VARIOIUS / VARIOUS MIPR Various Aug 2025 Aug 2025 12 4,416.67 Y 9.15) Expeditionary - Maintenance Small STCF 2025 VARIOUS / VARIOUS MIPR USMC Aug 2025 Aug 2025 3 182,000.00 Y 9.15) Expeditionary - Maintenance Small STCF 2026 VARIOUS / VARIOUS MIPR USMC Apr 2026 Apr 2026 8 191,000.00 Y 9.15) Expeditionary - Maintenance Small STCF 2027 Unknown / Unknown C / TBD ** NO PCO ** Oct 2026 Oct 2026 3 201,000.00 Y 2026 Unknown / Unknown C / TBD TBD Apr 2026 Apr 2026 2 316,281.60 N 2025 VARIOIUS / VARIOUS RO McCalister Sep 2025 Sep 2026 9 250,000.00 Y 2025 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 4 267,500.00 N Oct 2025 2027 TBD / TBD C / TBD ** NO PCO ** May 2027 May 2028 4 280,000.00 N Oct 2025 9.20) Expeditionary - PDR ATON Kit 2025 VARIOIUS / VARIOUS C / FP Various Sep 2025 Sep 2025 4 267,500.00 Y 9.21) Expeditionary - PDR Boat Ramp 2025 TBD / TBD C / TBD ** NO PCO ** Sep 2026 Sep 2027 4 79,500.00 Y 9.22) Expeditionary - PDR Matting 2025 TBD / TBD C / TBD ** NO PCO ** Jun 2026 Jun 2027 4 208,750.00 Y 9.23) Expeditionary - PDR Floating Work Platform 2025 TBD / TBD C / TBD ** NO PCO ** Jun 2026 Jun 2027 4 108,000.00 N 9.24) Expeditionary - PDR Pile Driving Barge 2026 Unknown / Unknown C / TBD ** NO PCO ** Jun 2026 Jun 2026 3 561,000.00 Y 9.25) Expeditionary - SIXCON Water, Pump, DED, 125GPM 2025 VARIOIUS / VARIOUS MIPR Various Apr 2025 Apr 2025 3 26,000.00 Y Item Number / Title [DODIC] 9.10) Expeditionary - Latrine System (47) 9.13) Expeditionary - Laundry, Selfservice TRICON GRN (49) 9.16) Expeditionary - Mobile Expandable Container Configuration (MECC) (50) 9.17) Expeditionary - NEFK STCF 9.18) Expeditionary - PDR Dive Platform (51) 9.18) Expeditionary - PDR Dive Platform (51) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million LI 6060 - Items less than $5 Million Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 38 of 42 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #125 RFP Issue Date Dec 2023 Nov 2025 Volume 5 - 112 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle 9.26) Expeditionary - SIXCON Water, Tank, 900GAL 2025 VARIOUS / VARIOUS MIPR ARMY Aug 2025 Aug 2025 2 48,000.00 Y 9.27) Expeditionary - Spill Containment Unit, Hazardous Material, 10'X10'X1' 2024 MILSTRIP / DLA MIPR DLA Sep 2024 Sep 2024 12 1,500.00 N 9.28) Expeditionary - Tool Kit, Mechanics Master Set 2024 MILSTRIP / DLA MIPR DLA Aug 2024 Aug 2024 2 25,500.00 Y 9.28) Expeditionary - Tool Kit, Mechanics Master Set 2025 MILSTRIP / DLA MIPR DLA Apr 2025 Apr 2025 2 26,000.00 Y 2024 VARIOUS / VARIOUS MIPR Various Sep 2024 Sep 2024 2 176,000.00 N Dec 2023 2025 VARIOUS / VARIOUS MIPR Various May 2025 May 2025 2 179,500.00 N Dec 2023 9.32) EXPEDITIONARY TRAILER 55T SEMI LOWBED HYD 2025 TBD / TBD C / TBD GSA May 2026 May 2027 9 255,000.00 Y 9.33) PIER REPAIR WATER FRONT CAPBILITY SETS 2025 CATERPILLAR / PEORIA, IL C / FFP DLA Sep 2025 Sep 2025 7 21,857.14 Y 9.34) EXPEDITIONARY WATER AND FUEL SERVICE CAP 2025 TBD / TBD C / TBD ** NO PCO ** Jun 2026 Jun 2027 5 27,166.67 Y 2026 TBD / TBD C / TBD ** NO PCO ** Apr 2026 Apr 2026 4 40,750.00 N Oct 2025 2027 TBD / TBD C / TBD ** NO PCO ** Aug 2027 Aug 2027 4 42,415.00 N Mar 2027 Item Number / Title [DODIC] 9.30) Expeditionary - Water Purification Equipment Set (52) 9.30) Expeditionary - Water Purification Equipment Set (52) 9.35) Expeditionary - Heater, Water, 400,000BTU (54) 9.36) Expeditionary - Pump Centrifugal Fuel 100GPM W/ Filter Separator (55) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Dec 2023 11) MOBILE UTILITIES SUPPORT EQUIPMENT (MUSE) 11.1) 2000 AMP, 5KV/15KV LOAD (58) 2027 Unknown / Unknown C / TBD ** NO PCO ** May 2027 May 2028 1 1,610K Y 11.2) 3200 AMP, 480 V MOBILE POWER MOUND AND MISC. AND CONNECTORS 2026 Unknown / Unknown C / TBD ** NO PCO ** May 2026 Nov 2026 1 520,000.00 Y C / FFP NAVFAC Jun 2025 Jun 2027 5 1,516K N C / TBD NAVFAC Jun 2026 Jun 2028 2 1,954K N DISTRIBUTION SWITCHGEAR 11.3) DIESEL GENERATORS (4160V) 11.3) DIESEL GENERATORS (4160V) 2025 2026 LI 6060 - Items less than $5 Million Navy ACTS Meltech / Planate-ARGO Federal Services - Joint Venture / (100) Miquin LLC / Maryland,VA / Alexandria, Virginia / Katy, TX ACTS Meltech / Planate-ARGO Federal Services - Joint Venture / (100) Miquin LLC / Maryland,VA / Alexandria, Virginia / Katy, TX UNCLASSIFIED Page 39 of 42 P-1 Line #125 Volume 5 - 113 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Method/Type or Funding Vehicle Aggregated Items: Items under $5 million Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 ACTS Meltech / Planate-ARGO Federal Services - Joint Venture / Miquin LLC / Maryland,VA / Alexandria, Virginia / Katy, TX C / FFP NAVFAC Jun 2025 Jun 2027 6 250,000.00 N 2026 Unknown / Unknown C / TBD ** NO PCO ** Aug 2026 Aug 2027 1 12,000K Y 2025 ADS Operational Equipment and Logistics Support / Virginia Beach, VA C / FFP NAVFAC Oct 2024 Feb 2025 4 86,500.00 Y 13.2) NELO 0826-02 Step Deck Trailer w/Ramps 2025 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA MIPR DLA Sep 2025 Sep 2026 1 98,000.00 Y 13.2) NELO 0826-02 Step Deck Trailer w/Ramps 2026 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA MIPR DLA Oct 2025 Oct 2025 2 94,048.00 Y 13.2) NELO 0826-02 Step Deck Trailer w/Ramps 2027 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA MIPR DLA Oct 2026 Oct 2026 2 95,929.00 Y 13.3) NELO Drop Deck w/Integral Ramps 2026 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA MIPR DLA Oct 2025 Oct 2025 3 65,091.00 Y 2026 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA MIPR DLA Oct 2025 Oct 2025 2 67,891.00 Y (101) Unknown / Unknown C / TBD ** NO PCO ** Aug 2027 Aug 2028 4 11,750.00 Y 13.6) NELO 0525-00, 4X2 STAKE/ FLAT BED, 12?24 FT, 25000? 26000 SIN 531 2026 FLEETSIDE FORD LLC / Osceola, IA Reqn GSA Oct 2025 Oct 2025 1 246,700.00 Y 13.7) NELO 0645-00, 6X4 LONGHAUL TRACTOR, 90000? 95000 LBS 2026 MACK DEFENSE, LLC / ALLENTOWN, PA Reqn GSA Oct 2025 Oct 2025 1 276,421.00 Y 2026 EXWC / Charleston, SC C / TBD Charleston, SC Aug 2026 Aug 2027 1 260,000.00 Y 2026 NAVFAC EXWC / PORT HUENEME, CA C / FFP EXWC May 2026 Jul 2027 1 2,299K Y 2027 DLA Troop Support / Philadelphia, PA C / TBD DLA Mar 2027 Jun 2027 1 929,000.00 N 2023 GSA / LENCO/Pittsfield, Ma MIPR GSA Apr 2023 Jan 2024 5 379,600.00 Y 11.6) 5000 KVA, 5KV/15KV TRANSFORMER ONLY 11.11) LHA-8 TEMPORARY 4160V SHORE POWER (Each) RFP Issue Date 12) OCEAN CONSTRUCTION EQUIPMENT 12.1) OCEAN CONSTRUCTION EQUIPMENT 13) SPECIAL PURPOSE VEHICLES 13.4) NELO Taut Liner Trailer, 48FT (60) 13.5) NELO Special Purpose Trailer (Nonstandard) (61) 2027 Oct 2024 14) MAINTENANCE SUPPORT EQUIPMENT 14.1) [USFFC] ORDNANCE CHASSIS TRAILERS (62) 14.2) ROTA Spain P622 Hyperbaric Systems 14.3) NECC N46 Equipment Infrastructure (63) Apr 2026 Aug 2026 Nov 2026 15) SPECIAL PURPOSE VEHICLES 15.1) SPECIAL PURPOSE VEHICLES - BEARCATS (64) LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 40 of 42 P-1 Line #125 Volume 5 - 114 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] 15.1) SPECIAL PURPOSE VEHICLES - BEARCATS (64) 15.1) SPECIAL PURPOSE VEHICLES - BEARCATS (64) 15.1) SPECIAL PURPOSE VEHICLES - BEARCATS (64) 15.1) SPECIAL PURPOSE VEHICLES - BEARCATS (64) O O C P-1 Line Item Number / Title: 6060 / Items less than $5 Million Aggregated Items: Items under $5 million FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2024 GSA / LENCO/Pittsfield, Ma MIPR GSA Jun 2024 Mar 2025 5 386,400.00 Y 2025 GSA / LENCO/Pittsfield, Ma MIPR GSA Jan 2025 Oct 2025 5 394,400.00 Y 2026 GSA / LENCO/Pittsfield, Ma MIPR GSA Mar 2026 Dec 2026 5 419,800.00 Y 2027 GSA / LENCO/Pittsfield, Ma MIPR GSA Jan 2027 Oct 2027 5 397,600.00 Y Qty (Each) RFP Issue Date Footnotes: (65) (66) (67) (68) (69) (70) (71) (72) (73) (74) (75) (76) (77) (78) (79) (80) (81) (82) (83) (84) (85) (86) (87) (88) (89) extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 41 of 42 P-1 Line #125 Volume 5 - 115 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 (90) (91) (92) (93) (94) (95) (96) (97) (98) (99) P-1 Line Item Number / Title: 6060 / Items less than $5 Million Aggregated Items: Items under $5 million Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27 extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. FY27- Extended lead time requirement driven by ongoing supply chain constraints affecting transportation and vehicle component availability. (100) (101) CP MAAC Vendors The contractor will remain unknown until proposal for bids is issued. LI 6060 - Items less than $5 Million Navy UNCLASSIFIED Page 42 of 42 P-1 Line #125 Volume 5 - 116 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6075 / Physical Security Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 6.732 1.301 1.297 0.998 0.000 0.998 1.109 1.109 1.118 - - - - - - - - - 6.732 1.301 1.297 0.998 0.000 0.998 1.109 1.109 1.118 - - - - - - - - - 6.732 1.301 1.297 0.998 0.000 0.998 1.109 1.109 1.118 To FY 2031 Complete 1.131 Continuing - Continuing - 1.131 Continuing - Total - Continuing - - 1.131 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget funds procurement of physical security vehicles to include armored sedans and armored cargo/utility trucks assigned to Antiterrorism (AT), Counterintelligence (CI), and Counternarcotics (CN) missions in high threat Outside Continental United States (OCONUS) locations. Sedans and cargo/utility trucks are armored to various levels of protection and are on platforms of varying sizes and gross vehicle weights, dependent upon the level of threat and the operating environment. These vehicles are generically referred to as either Commercial Heavy Armored Vehicles (CHAVs) or Commercial Light Armored Vehicles (CLAVs). LI 6075 - Physical Security Vehicles Navy UNCLASSIFIED Page 1 of 4 P-1 Line #126 Volume 5 - 117 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 05: Civil Engineering Support Equip / BSA 1: 6075 / Physical Security Vehicles Civil Engineering Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Physical Security Vehicles P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 6.732 - / 1.301 - / 1.297 - / 0.998 - / 6.732 - / 1.301 - / 1.297 - / 0.998 - / - - / 0.998 / 0.000 - / 0.998 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The 2027 budget request is mission-critical for the procurement of physical security vehicles including armored sedans and armored cargo/utility trucks used to support Antiterrorism (AT), Counterintelligence (CI), and Counternarcotics (CN) missions in high threat OCONUS environments. These platforms, categorized as Commercial Heavy Armored Vehicles (CHAVs) and Commercial Light Armored Vehicles (CLAVs), are configured with varying protection levels, survivability features, and mission-specific equipment based on threat conditions and operational requirements. These vehicles enable secure movement of personnel, classified materials, and sensitive equipment; support surveillance and interdiction operations; and provide protected mobility for forces conditioning AT/ CI/CN activities. As threats evolve, the ability to field vehicles with appropriate ballistic protection, blast resistance, and mobility performance becomes increasingly essential. Aging or under-protected vehicles elevate operational risk, reduce mission flexibility, and increase vulnerability to surveillance, interdiction, and attack. Deferred replacement compounds risk by increasing maintenance downtime, reducing fleet availability, and degrading the ability of security forces to respond rapidly to emerging threats. In high-threat OCONUS environments, where host-nations support may be limited and U.S. Forces rely heavily on organic mobility, these gaps directly affect force protection posture and the safety of Navy personnel. LI 6075 - Physical Security Vehicles Navy UNCLASSIFIED Page 2 of 4 P-1 Line #126 Volume 5 - 118 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 6075 / Physical Security Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Physical Security Vehicles ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) LIGHT ARMORED VEHICLES 1.1) 4X4 4 DOOR 6 PASS LIGHT A - - 6.732 216,833.33 Subtotal: 1) LIGHT ARMORED VEHICLES - - 6.732 - - 1.301 - - 1.297 - Total - - 6.732 - - 1.301 - - 1.297 - ARMORED (1)(†) 6 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 1.301 216,166.33 6 1.297 249,500.00 4 0.998 - - - 249,500.00 4 0.998 - 0.998 - - - - - 0.998 - 0.998 - - - - - 0.998 indicates the presence of a P-5a Footnotes: (1) FY27 Unit cost increased, resulting in reduced quantities to remain within the funding level. LI 6075 - Physical Security Vehicles Navy UNCLASSIFIED Page 3 of 4 P-1 Line #126 Volume 5 - 119 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 05 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 6075 / Physical Security Vehicles Method/Type or Funding Vehicle Aggregated Items: Physical Security Vehicles Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 BZ Defense LLC / San Diego, California MIPR GSA Jun 2025 Jun 2025 6 216,833.33 Y 2026 BZ Defense LLC / San Diego, California MIPR GSA Jun 2026 Jun 2026 6 216,166.33 Y 2027 Square One Armoring Services / Miami, FL MIPR GSA May 2027 May 2027 4 249,500.00 Y (Each) RFP Issue Date 1) LIGHT ARMORED VEHICLES 1.1) 4X4 4 DOOR 6 PASS LIGHT ARMORED (1) 1.1) 4X4 4 DOOR 6 PASS LIGHT ARMORED (1) 1.1) 4X4 4 DOOR 6 PASS LIGHT ARMORED (1) LI 6075 - Physical Security Vehicles Navy UNCLASSIFIED Page 4 of 4 P-1 Line #126 Volume 5 - 120 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 68.934 56.585 0.000 67.828 0.000 67.828 47.866 51.463 53.379 - - - - - - - - - 68.934 56.585 0.000 67.828 0.000 67.828 47.866 51.463 53.379 - - - - - - - - - 68.934 56.585 0.000 67.828 0.000 67.828 47.866 51.463 53.379 To FY 2031 Complete 54.449 Continuing - Continuing - 54.449 Continuing - Total - Continuing - - 54.449 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Material Handling Equipment (MHE) and Shipboard Mobile Support Equipment (SMSE) is critical as ships cannot be mission-ready without the proper MHE/SMSE to move essential ammo, stores and material. Appropriate MHE is required to ensure efficient storage and handling operations within the U.S. Navy's various facilities and ships. The program focuses on shipboard and shore-based MHE/SMSE life-cycle management and in-service support for the procurement, overhaul, upgrade, and refurbishment. MHE/SMSE includes all self-propelled equipment approved for use in storage and handling operations in and around warehouses, shipyards, industrial plants, airfields, magazines, depots, terminals, aboard U.S. Navy ships, and at expeditionary bases. NAVY CASH PROGRAM: This program funds the procurement of the Navy Cash system. Navy Cash was developed in partnership with the US Department of Treasury to improve business processes, create workload efficiencies, and enhance the quality of life for Sailors and Marines on board ships. It enhances the efficiencies and security of automated pay delivery and safekeeping. Navy Cash automates all retail collections on ship and is a Treasury Direct Disbursing (TDD) compliant system in accordance with critical regulatory and Financial Improvement and Audit Readiness (FIAR) compliance standards mandated by DoW and Department of Treasury for achieving audit readiness of financial statements. Navy Cash system performs daily reporting of financial accountability as part of the TDD mandate Department of the Navy Office of The Assistant Secretary (Financial Management and Comptroller) dated 14 Nov 2018 and corrects an identified material weakness. Deployments are ongoing and are dependent on ship schedules and CNO availabilities. The legacy Navy Cash environment is dependent on a specific hardware and software environment that is costly to maintain and reaching end-of-life on key operating components. Navy Cash 2.0 is the next progression in cashless operations that will enhance the current Navy Cash solution and support interoperability with all other DoW service partners (Army, AF, USMC). The Navy Cash card is a branded debit card that looks like a typical debit or check card. It utilizes a pre-paid debit model to provide deployed Sailors and Marines 24/7 access to pay and enables a cashless shipboard environment for all retail and other personal financial transactions. In addition, Navy Cash cards are an important tool for deployed Sailors and Marines to obtain cash at any worldwide ATM ashore. Navy Cash reduces workload for the Disbursing Office and other retail merchants throughout the ship including Ships Store, Food Service, Postal and MWR. This affords more time for core functions and thereby increases readiness. It also improves shipboard business practices by automating and significantly reducing the handling of bills, coins, and personal checks, automating back-end financial processes and minimizing error-prone cash transactions while it reduces the workload associated with cash management and improves the efficiency and accuracy of fiscal accountability. This overall reduction in the need for cash decreases the costs associated with maintaining large amounts of cash in the safes of ships for the six or more months of deployment. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 1 of 17 P-1 Line #127 Volume 5 - 121 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A NAVAL AUTONOMOUS DATA COLLECTION SYSTEM (NADACS): The Naval Autonomous Data Collection System (NADACS) is an Enterprise level, multi-source, digital tracking tool that supports asset visibility, accountability & auditability. The system directly supports both Congressional and Departmental dictates that require Navy to improve its ability to maintain and track material, assets and equipment with a high degree of accuracy and accountability. NADACS uses a variety of handheld readers, fixed readers, Mesh networking, and sensors to collect asset and combine data from barcoding, Radio Frequency identification (RFID) and Internet of Things (IOT) sensors to provide locational and health information of assets which can then be compared with on-hand inventory records. NAVSUP will be employing cellular 5G capabilities with Satellite Communication (SATCOM) along with other communication transport methods to move data from point of collection to the NADACS database, and then providing end users with a 'Web Browser' picture to assess and manage the asset picture. NADACS is based on government owned software coupled with specialty and commercially available hardware to create a complete system. For commercial hardware, the system is hardware agnostic, encouraging use of available hardware while maintaining a high degree of competition. Ordnance Information Systems (OIS): Funding supports tech refresh of obsolescent legacy CK71 barcode scanners and printers that require replacement. Legacy scanners are dependent on End-of-Life (EoL) software that is no longer supported by modern operating systems, resulting in widespread capability loss. This shortfall creates increased workload for OIS users and requires an ever-increasing number of manual updates to OIS inventory data. This manual work introduces errors and increases workload to the Fleet, significantly impacting ordnance asset visibility, handling timeliness, and safety. The FY 2026 spend plan amount for Supply Equipment includes $0 thousand of discretionary and $40,800 thousand of mandatory (reconciliation) for a total of $40,800 thousand. The mandatory funds supported work for At-Sea Rearm of Vertical Launch System (T2). [P40A / Shipboard Program]: NAVSUP FY26 to FY27 Growth Justification. Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. [P40A / 1340 20K Diesel Forklift]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1340 20K Diesel Forklift (NEST OTA)]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1350 6K Diesel Forklift]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1351 6K Diesel LP Forklift]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 2 of 17 P-1 Line #127 Volume 5 - 122 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A [P40A / 1370 6K Electric Forklift]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1396 Aerial Work Platform]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1610 6K Electric Pallet Jack]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1820 4K RT Diesel Forklift]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1900 6K Manual Pallet Jack]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 5701 Mobile Cleaning, Recovery, & Recycle System (MCRRS)]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / Commercial Off-The-Shelf (COTS) Program]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to NAVSUP. NAVSUP is scaling to take full ownership of Navy's MHE requirements. As a result, it will cause growth as we address MHE deficiencies across the service. [P40A / 1370 10K Forklift Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 3 of 17 P-1 Line #127 Volume 5 - 123 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A [P40A / 1305 6K Forklift Propane]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1340 15K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1340 20K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1340 30K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1340 36K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1350 10K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1370 25K Forklift Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1390 4K Forklift Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1820 20K Pallet Truck Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 4 of 17 P-1 Line #127 Volume 5 - 124 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1880 8K Side Loader Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1890 12K Front/Side Loader (Swing Mast) Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1350 6K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1330 6K Forklift Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1370 4K Forklift Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1370 6K Forklift Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / 1433 25K Elevated Platform Diesel]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy [P40A / 1820 6K Pallet Truck Electric]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 5 of 17 P-1 Line #127 Volume 5 - 125 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A [P40A / Non-Powered]: NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. [P40A / At-Sea Rearm of Vertical Launch System]: NAVSUP is the central procurer for Material Handling Equipment across the service. At-Sea Rearm of Vertical Launch System (T2) was incorrectly placed with NAVSUP. Navy has corrected this through a BSO realignment. NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. The FY 2027 request for At-Sea Rearm of Vertical Launch System (T2) includes $25,000,000 thousand of mandatory funding. The mandatory funds for At-Sea Rearm of Vertical Launch System (T2) will support the development and fielding of a capability to re-arm the Mk 41 Vertical Launching Systems (VLS) on warships while at sea. This is a critical capability that the Secretary of the Navy has identified as a top priority to significantly increase forward, persistent combat power with the current force. [P5 / Navy Cash Program]: NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS [P5 / Naval Autonomous Data Collection System (NADACS)]: NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS [P5 / Ordnance Information System (OIS) Tech Refresh]: NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 6 of 17 P-1 Line #127 Volume 5 - 126 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7025 / Supply Equipment Program Elements for Code B Items: 0708012N Other Related Program Elements: 0204996N, 0701112N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Supply Equipment (Materials Handling Equipment) - / 50.789 - / 29.532 / - - / 63.109 / - - P-5 1 / Supply Equipment - / 18.145 - / 27.053 - - / 0.000 - / 4.719 - - / 0.000 - / 63.109 / 4.719 P-40 Total Gross/Weapon System Cost - / 68.934 - / 56.585 - / 0.000 - / 67.828 - / 0.000 - / 67.828 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 budget request of $67.8 million for Supply Equipment represents a restoration of funding to the required operational baseline and includes the strategic realignment of NAVSUP's centralized procurement responsibilities. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. The FY27 request is driven by two primary factors: Centralization of Material Handling Equipment (MHE) Procurement ($63.1M): In alignment with OPNAVINST 4460.1C, NAVSUP is now the single point of accountability for all Navy MHE. This funding represents a transfer of responsibility from other commands to NAVSUP to address systemic equipment deficiencies through a unified, centrally managed strategy. Restoration of Critical Support Programs ($4.7M): This restores funding for essential programs, including the Navy Cash and Ordnance Information Systems (OIS) programs, which were forced to suspend operations and modernization efforts in FY26. This request is not growth, but funding restoration to address critical Fleet needs. NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS. Consequently, all program activities including new procurements, system modernization, and technology refreshes were curtailed, creating significant operational and modernization gaps. Failure to fund this request in FY27 will have a two-fold negative impact: 1. MHE Degradation: The Navy's strategic effort to correct systemic MHE deficiencies through centralized management will fail. Individual commands will be forced to continue funding MHE in an uncoordinated and inefficient manner, perpetuating existing readiness gaps. 2. Capability Gaps: Critical support programs will be further degraded. The OIS tech refresh will be delayed, increasing risk in ordnance management. The Navy Cash program will be unable to support new deployments or modernization, negatively impacting sailor quality of life and financial accountability. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 7 of 17 P-1 Line #127 Volume 5 - 127 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 7025 / Supply Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Prior Years MDAP/ Item Number / Title [DODIC] 1) Shipboard Program ID CD A (†) Crane 1.2) 1340 20K Diesel (2)(†) A 1.3) 1340 20K Diesel Forklift (NEST OTA) A 1.4) 1350 6K Diesel A (3) Forklift (4) 1.5) 1351 6K Diesel LP Forklift (5)(†) A 1.6) 1370 4K Electric Forklift A 1.7) 1370 6K Electric A Forklift Code Unit Cost ($) (6)(†) 1.8) 1390 4.5K (†) 1.9) 1396 Aerial Work (7) 1.10) 1610 6K Electric Pallet Jack (8) 1.11) 1820 4K RT Diesel Forklift (9)(†) 1.12) 1900 6K Manual Pallet Jack (10)(†) 1.13) 5701 Mobile Cleaning, Recovery, & Recycle System (MCRRS) ($ M) ($) 13 3.626 251,875.00 8 2.015 265,515.00 290,000.00 3 0.870 1,613K 35,500.00 2 0.071 - 133,928.57 28 93,658.54 215,000.00 A - A Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) A A - - - - - - - - - - - - - 2 0.531 - - - - - - - - - - - - 3 4.838 - - - - - - - - - - - - - - - - - - - - - - - - - - 3.750 137,500.00 24 3.300 - - - 4.000 - - - 82 7.680 - - - - - - - - - - - - - - - 6 1.290 - - - - - - - - - - - - - - - - 1,494K 4.482 - - - - - - - - - - - - - - - 3 800,000.00 5 800,000.00 5 4.000 115,750.00 8 0.926 - - - - - - 196,700.00 20 3.934 - - - 196,700.00 20 3.934 82,710.84 83 6.865 - - - - - - 82,233.00 48 3.947 - - - 82,233.00 48 3.947 191,583.33 12 2.299 172,888.00 6 1.037 0.00 0.000 235,090.91 22 5.172 - - - 235,090.91 22 5.172 A - - 6 - 15,162.00 23 0.349 - - - 18,078.00 100 1.808 - - - 18,078.00 100 1.808 3.941 1,633K 3 4.898 - - - 1,163K 4 4.651 - - - 1,163K 4 4.651 - 33.333 - 19.435 - - - - - 23.512 - - - - - 23.512 - - - 0.077 - - - - - - - - - - - - - - - - - - - 0.604 - - - - - - 0.039 - - - - - - - A 1,314K 3 (11)(†) Subtotal: 1) Shipboard Program 2) Commercial Off-The-Shelf (COTS) Program 2.2) 1330 4K Forklift (†) A Diesel 2.3) 1370 10K Forklift Electric (Each) Unit Cost 278,923.08 Electric Forklift Platform Qty FY 2026 Total Cost (1) 1.1) 1200 30K Forklift MAIS FY 2025 Total Cost Aggregated Items Title: Supply Equipment (Materials Handling Equipment) (13)(†) 2.4) 1302 6K Forklift Dual Fuel (LPG/Gas) A A LI 7025 - Supply Equipment Navy - - (12) 38,648.00 39,482.00 2 1 UNCLASSIFIED Page 8 of 17 86,272.00 - 7 - P-1 Line #127 86,272.00 - 7 - 0.604 - Volume 5 - 128 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 7025 / Supply Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.5) 1305 6K Forklift A Propane (14)(†) 2.6) 1322 6K Forklift Dual Fuel (LPG/ Gas) MAIS Code Unit Cost A (†) 2.7) 1331 6K Forklift (†) A Diesel 2.8) 1340 10K Forklift (†) A Diesel 2.9) 1340 12K Forklift (†) A Diesel 2.10) 1340 15K Forklift Diesel (15)(†) 2.11) 1340 20K Forklift Diesel (16)(†) 2.12) 1340 30K Forklift Diesel (17)(†) 2.13) 1340 36K Forklift Diesel (18)(†) 2.14) 1340 8K Forklift (†) A A A A A Diesel 2.16) 1350 10K Forklift Diesel (19)(†) 2.17) 1350 15K Forklift Diesel (†) 2.18) 1370 25K (20)(†) Forklift Electric 2.20) 1390 4K Forklift Electric (21)(†) 2.22) 1820 20K Pallet Truck Electric (22)(†) 2.24) 1820 60K Pallet Truck Electric (†) 2.25) 1880 12K Side (†) A A A A A A A Loader Electric 2.26) 1880 8K Side Loader Electric (23)(†) A LI 7025 - Supply Equipment Navy ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Supply Equipment (Materials Handling Equipment) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) - - - 38,545.00 2 0.077 - - - - - - 37,913.00 1 0.038 - - - - - - 46,331.00 4 0.185 - - - - - - 116,269.00 5 0.581 0.00 - - - 85,340.00 9 0.768 - - - - - - 195,554.00 2 0.391 - - - 165,564.00 - - - 204,907.00 3 0.615 - - - - - - - - - - - - - - - - - - 0.00 - - - 0.314 - - - - - - - - - - - - - 0.432 - - - - - - - - - - - - 490,708.00 - - - - - - - - - - - - - - - - - - - - - 2,006K 1 2.006 - - - - - - - 232,248.00 1 0.232 - - - - - - - - - - - 62,710.00 - 5 - 107,919.00 - 4 - 5 1 Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) (Each) ($ M) 0.680 - - - - - - - - - - - - - - - 0.197 - - - - - - - 7 1.159 - - - 165,564.00 7 1.159 171,986.00 8 1.376 - - - 171,986.00 8 1.376 359,975.00 2 0.720 - - - 359,975.00 2 0.720 0.000 400,000.00 2 0.800 - - - 400,000.00 2 0.800 - - - - 0.372 - - - - - - - 2 0.981 - - - 490,708.00 2 0.981 91,382.00 5 0.457 - - - 91,382.00 5 0.457 251,555.00 3 0.755 - - - 251,555.00 3 0.755 - - - - - - - - - - - - - - - - 0.582 - - - 0.000 196,952.00 - - 1 - - 123,992.00 - 290,805.00 3 - 2 P-1 Line #127 67,969.00 Total Cost Qty 10 UNCLASSIFIED Page 9 of 17 67,969.00 FY 2027 OOC Total Cost 10 0.680 - - - - - - 196,952.00 - - 1 - - 290,805.00 - - 123,992.00 0.197 3 - 0.372 - 2 0.582 Volume 5 - 129 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 7025 / Supply Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.27) 1890 12K Front/ Side Loader (Swing A Code Unit Cost 2.28) 1350 6K Forklift (25)(†) A 2.31) 1325 6K Forklift A (†) Propane 2.32) 1330 6K Forklift (26)(†) 2.33) 1370 4K Forklift Electric (27)(†) 2.34) 1370 6K Forklift Electric (28)(†) 2.35) 1433 25K Elevated Platform A A A (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 270,122.00 1 0.270 - - - 269,472.00 7 1.886 - - - 269,472.00 7 1.886 - - - 47,498.00 6 0.285 - - - 55,314.00 9 0.498 - - - 55,314.00 9 0.498 178,833.33 24 4.292 - - - - - - - - - - - - - - - 62,793.10 29 1.821 - - - - - - - - - - - - - - - 55,469.70 66 3.661 51,259.00 6 0.308 - - - 72,827.00 15 1.092 - - - 72,827.00 15 1.092 47,545.45 22 1.046 48,682.00 28 1.363 - - - 53,130.00 18 0.956 - - - 53,130.00 18 0.956 66,333.33 45 2.985 51,292.00 22 1.128 - - - 55,881.00 15 0.838 - - - 55,881.00 15 0.838 1,192K 3 3.575 - - - - - - - - - - - - A (†) Diesel 2.36) 1820 6K Pallet Qty FY 2026 Total Cost - A 2.30) 1320 6K Forklift Propane Diesel ($) (24)(†) Mast) Electric Diesel MAIS FY 2025 Total Cost Aggregated Items Title: Supply Equipment (Materials Handling Equipment) A - - - - - - 141,565.00 2 0.283 - - - 126,524.00 5 0.633 - - - 126,524.00 5 0.633 - - 0.076 3,583.00 1 0.004 - - - 11,010.00 1 0.011 - - - 11,010.00 1 0.011 - - - 31,490.00 1 0.031 - - - - - - - - - - - - - - - 120,570.00 1 0.121 - - - - - - - - - - - - - - - 62,710.00 1 0.063 - - - - - - - - - - - - - - - 243,136.00 2 0.486 - - - - - - - - - - - - - - - - - - - - - 25.000 - - - Subtotal: 2) Commercial Off-TheShelf (COTS) Program - - 17.456 - - 10.097 - - - - - 39.597 - - - - - 39.597 Total - - 50.789 - - 29.532 - - - - - 63.109 - - - - - 63.109 (29)(†) Truck Electric 2.37) Non-Powered A 2.41) 1600 3K Pallet A (30)(†) Truck Electric (†) 2.43) 1125 7.5K (†) A Tractor Diesel 2.44) 1340 7K Forklift (†) A Diesel 2.45) 1820 10K Pallet Truck Electric (†) 2.46) At-Sea Rearm of Vertical Launch System A A (31) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 25,000K 1 25,000K 1 25.000 indicates the presence of a P-5a LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 10 of 17 P-1 Line #127 Volume 5 - 130 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 P-1 Line Item Number / Title: 7025 / Supply Equipment Aggregated Items Title: Supply Equipment (Materials Handling Equipment) Footnotes: (1) NAVSUP FY26 to FY27 Growth Justification. Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. (2) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (3) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (4) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (5) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (6) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (7) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (8) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (9) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (10) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (11) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (12) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to NAVSUP. NAVSUP is scaling to take full ownership of Navy's MHE requirements. As a result, it will cause growth as we address MHE deficiencies across the service. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 11 of 17 P-1 Line #127 Volume 5 - 131 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 P-1 Line Item Number / Title: 7025 / Supply Equipment Aggregated Items Title: Supply Equipment (Materials Handling Equipment) (13) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (14) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (15) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (16) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (17) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (18) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (19) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (20) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (21) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (22) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (23) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (24) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (25) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 12 of 17 P-1 Line #127 Volume 5 - 132 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 P-1 Line Item Number / Title: 7025 / Supply Equipment Aggregated Items Title: Supply Equipment (Materials Handling Equipment) As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (26) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (27) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (28) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (29) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy (30) NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. (31) NAVSUP is the central procurer for Material Handling Equipment across the service. At-Sea Rearm of Vertical Launch System (T2) was incorrectly placed with NAVSUP. Navy has corrected this through a BSO realignment. NAVSUP FY26 to FY27 Growth Justification: Navy is centralizing the procurement of Material Handling Equipment (MHE) to Commander, Naval Supply Systems Command (COMNAVSUP) in alignment with OPNAVINST 4460.1C, which designates COMNAVSUP as the single point of accountability for Navy-wide MHE procurement. NAVSUP is scaling to take full ownership of the Navy's MHE requirements across all Budget Submitting Offices (BSOs), both afloat and ashore. As a result, growth reflects the Service-wide effort to address MHE deficiencies through a unified, centrally managed procurement strategy. The significant variance from the FY26 enacted budget of $0 is the result of a one-time congressional decision that eliminated funding for that fiscal year. The FY 2027 request for At-Sea Rearm of Vertical Launch System (T2) includes $25,000,000 thousand of mandatory funding. The mandatory funds for At-Sea Rearm of Vertical Launch System (T2) will support the development and fielding of a capability to re-arm the Mk 41 Vertical Launching Systems (VLS) on warships while at sea. This is a critical capability that the Secretary of the Navy has identified as a top priority to significantly increase forward, persistent combat power with the current force. LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 13 of 17 P-1 Line #127 Volume 5 - 133 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Contractor and Location Method/Type or Funding Vehicle 2024 NACCO / Ohio 2024 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA 2025 1.5) 1351 6K Diesel LP Forklift (5) 1.5) 1351 6K Diesel LP Forklift (5) 1.5) 1351 6K Diesel LP Forklift (5) Aggregated Items: Supply Equipment (Materials Handling Equipment) Location of PCO Award Date Date of First Delivery C / FP Philadelphia, PA Oct 2023 Oct 2023 12 300,000.00 Y C / FP Philadelphia, PA Sep 2024 Nov 2024 8 251,871.00 Y AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA C / FP Philadelphia, PA Oct 2024 Oct 2024 2 265,515.00 N 2024 Hyster / CA C / FP DSC Philadelphia Oct 2023 Oct 2023 7 156,887.00 Y 2025 Hyster / CA C / FP DSC Philadelphia Oct 2024 Oct 2024 24 137,500.00 Y 2027 Hyster / CA C / FP DSC Philadelphia Oct 2026 Oct 2026 5 800,000.00 Y (6) 2024 Wesley/GA / New MFG - Loc C / FP Philadelphia, PA Oct 2023 Oct 2023 6 215,000.00 Y 1.8) 1390 4.5K Electric Forklift 2025 Wesley/GA / New MFG - Loc C / FP DSC Philadelphia Dec 2024 Dec 2024 3 1,494K Y Oct 2024 1.11) 1820 4K RT Diesel Forklift (9) 2025 Wesley/GA / New MFG - Loc C / FP DSC Philadelphia Mar 2025 Mar 2025 6 172,888.00 Y Oct 2024 1.11) 1820 4K RT Diesel Forklift (9) 2026 Wesley/GA / New MFG - Loc C / FP DSC Philadelphia Oct 2025 Oct 2025 6 0.00 N 1.11) 1820 4K RT Diesel Forklift (9) 2027 Wesley/GA / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 22 235,090.91 N 2025 Wesley / GA C / FP Philadelphia, PA Jul 2025 Jul 2025 23 15,162.00 Y Nov 2026 2027 Wesley / GA C / FP Philadelphia, PA Jul 2027 Jul 2027 100 18,078.00 Y Nov 2026 2024 Triverus, LLC / Palmer, AK C / FP Philadelphia, PA Sep 2024 Sep 2024 3 1,314K Y 2025 Triverus, LLC / Palmer, AK C / FP Philadelphia, PA Oct 2024 Oct 2024 3 1,633K Y 2027 Triverus, LLC / Palmer, AK C / FP DSC Philadelphia Oct 2026 Oct 2026 4 1,163K Y Jun 2025 Jun 2025 2 38,648.00 N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 7025 / Supply Equipment FY Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Shipboard Program 1.1) 1200 30K Crane 1.2) 1340 20K Diesel Forklift (2) 1.2) 1340 20K Diesel Forklift (2) 1.7) 1370 6K Electric Forklift 1.12) 1900 6K Manual Pallet Jack (10) 1.12) 1900 6K Manual Pallet Jack (10) 1.13) 5701 Mobile Cleaning, Recovery, & Recycle System (MCRRS) (11) 1.13) 5701 Mobile Cleaning, Recovery, & Recycle System (MCRRS) (11) 1.13) 5701 Mobile Cleaning, Recovery, & Recycle System (MCRRS) (11) Oct 2023 Mar 2024 2) Commercial Off-The-Shelf (COTS) Program 2.2) 1330 4K Forklift Diesel 2025 Hyundai / New MFG - Loc C / FP DSC Philadelphia 2.3) 1370 10K Forklift Electric (13) 2027 Hyster / California C / FP DSC Philadelphia Oct 2026 Oct 2026 7 86,272.00 Y 2.5) 1305 6K Forklift Propane (14) 2025 Hyster / California C / FP DSC Philadelphia Jun 2025 Jun 2025 2 38,545.00 Y 2.5) 1305 6K Forklift Propane (14) 2027 Hyster / California C / FP DSC Philadelphia Oct 2026 Oct 2026 10 67,969.00 Y LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 14 of 17 P-1 Line #127 Jun 2025 Volume 5 - 134 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Aggregated Items: Supply Equipment (Materials Handling Equipment) FY Contractor and Location Method/Type or Funding Vehicle 2.6) 1322 6K Forklift Dual Fuel (LPG/Gas) 2025 Doosan / New MFG - Loc C / FP 2.7) 1331 6K Forklift Diesel 2025 Doosan / New MFG - Loc C / FP Philadelphia, PA Oct 2024 Oct 2024 2.8) 1340 10K Forklift Diesel 2025 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2024 Oct 2024 2.8) 1340 10K Forklift Diesel 2026 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2025 2.8) 1340 10K Forklift Diesel 2027 Doosan / New MFG - Loc C / FP DSC Philadelphia 2.9) 1340 12K Forklift Diesel 2025 Doosan / New MFG - Loc C / FP Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 7025 / Supply Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Philadelphia, PA Mar 2025 Mar 2025 1 Qty (Each) 37,913.00 Y 4 46,331.00 Y 5 116,269.00 Y Oct 2025 5 0.00 Y Oct 2026 Oct 2026 1 196,952.00 Y DSC Philadelphia Oct 2024 Oct 2024 9 85,340.00 Y 2.10) 1340 15K Forklift Diesel (15) 2025 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2024 Oct 2024 2 195,554.00 Y 2.10) 1340 15K Forklift Diesel (15) 2027 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 7 165,564.00 Y 2.11) 1340 20K Forklift Diesel (16) 2025 Hyundai / New MFG - Loc C / FP DSC Philadelphia Jan 2025 Jan 2025 3 204,907.00 Y 2.11) 1340 20K Forklift Diesel (16) 2027 Wiggins / New MFG - Loc C / FP DSC Philadelphia Jul 2027 Jul 2027 8 171,986.00 Y 2.12) 1340 30K Forklift Diesel (17) 2027 Hyundai / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 2 359,975.00 Y 2.13) 1340 36K Forklift Diesel (18) 2026 Hyundai / New MFG - Loc C / FP DSC Philadelphia Oct 2025 Oct 2025 1 0.00 Y 2.13) 1340 36K Forklift Diesel (18) 2027 Hyundai / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 2 400,000.00 Y 2025 Hyundai / New MFG - Loc C / FP DSC Philadelphia Apr 2025 Apr 2025 5 62,710.00 Y 2027 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 3 123,992.00 Y 2.14) 1340 8K Forklift Diesel 2.16) 1350 10K Forklift Diesel (19) 2.17) 1350 15K Forklift Diesel 2025 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2024 Oct 2024 4 107,919.00 Y (20) 2027 Hyster / California C / FP DSC Philadelphia Oct 2026 Oct 2026 2 490,708.00 Y (21) 2027 Hyster / California C / FP DSC Philadelphia Oct 2026 Oct 2026 5 91,382.00 Y 2027 Liftking / Ontario, Canada C / FP DSC Philadelphia Oct 2026 Oct 2026 3 251,555.00 Y 2.24) 1820 60K Pallet Truck Electric 2025 ADVANCED MATERIAL HANDLING LLC / Atlanta, GA C / FP DSC Philadelphia Oct 2025 Oct 2025 1 2,006K Y 2.25) 1880 12K Side Loader Electric 2025 Combi LIft / New MFG - Loc C / FP Greensboro, NC Oct 2024 Oct 2024 1 232,248.00 N 2027 Combi LIft / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 2 290,805.00 Y 2025 Combi LIft / New MFG - Loc C / FP DSC Philadelphia Oct 2024 Oct 2024 1 270,122.00 N 2027 Combi LIft / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 7 269,472.00 Y 2025 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2024 Oct 2024 6 47,498.00 Y 2.18) 1370 25K Forklift Electric 2.20) 1390 4K Forklift Electric 2.22) 1820 20K Pallet Truck Electric (22) 2.26) 1880 8K Side Loader Electric (23) 2.27) 1890 12K Front/Side Loader (Swing Mast) Electric (24) 2.27) 1890 12K Front/Side Loader (Swing Mast) Electric (24) 2.28) 1350 6K Forklift Diesel (25) LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 15 of 17 P-1 Line #127 RFP Issue Date Volume 5 - 135 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Aggregated Items: Supply Equipment (Materials Handling Equipment) FY Contractor and Location Method/Type or Funding Vehicle 2027 Doosan / New MFG - Loc C / FP DSC Philadelphia Oct 2026 Oct 2026 9 55,314.00 Y 2024 Hyster / CA C / FP DSC Philadelphia May 2024 May 2024 2 55,888.00 Y Nov 2023 2.32) 1330 6K Forklift Diesel (26) 2024 NACCO / OH C / FP DSC Philadelphia Mar 2024 Mar 2024 30 74,285.00 Y Oct 2023 2.32) 1330 6K Forklift Diesel (26) 2025 NACCO / OH C / FP DSC Philadelphia Apr 2025 Apr 2025 6 51,259.00 Y Dec 2024 2024 ADVANCED MATERIAL HDLG, LLC / WATKINSVILLE, GA C / FP DSC Philadelphia Apr 2024 Apr 2024 16 49,595.00 Y Nov 2023 2025 ADVANCED MATERIAL HDLG, LLC / WATKINSVILLE, GA C / FP DSC Philadelphia Mar 2025 Mar 2025 28 48,682.00 Y Dec 2024 2024 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA C / FP DSC Philadelphia Apr 2024 Apr 2024 25 71,035.00 Y Dec 2023 2025 AMERICAN MATERIAL HANDLING INC. / WATKINSVILLE, GA C / FP DSC Philadelphia May 2025 May 2025 22 51,292.00 Y Dec 2024 2024 Wright & Wright / Kentucky C / FP Philadelphia, PA Jun 2024 Dec 2024 1 0.00 Y Feb 2024 2025 HYSTER-YALE GROUP, INC / GREENVILLE , NC C / FP Philadelphia, PA Nov 2024 Nov 2024 2 141,565.00 Y Jun 2023 2027 HYSTER-YALE GROUP, INC / GREENVILLE , NC C / FP Philadelphia, PA Oct 2026 Oct 2026 5 126,524.00 Y 2025 Wesley/GA / New MFG - Loc / Philadelphia, PA C / FP DSC Philadelphia Aug 2026 Aug 2026 1 3,583.00 Y 2027 Wesley/GA / New MFG - Loc / Philadelphia, PA C / FP DSC Philadelphia Oct 2026 Oct 2026 1 11,010.00 N 2025 Crown Equipment Corp / New Bremen, OH C / FP CROWN EQUIPMENT CORP Oct 2024 Oct 2024 1 31,490.00 N 2.43) 1125 7.5K Tractor Diesel 2025 SELLICK / New MFG - Loc C / FP SELLICK Oct 2024 Oct 2024 1 120,570.00 N 2.44) 1340 7K Forklift Diesel 2025 Liftking / Ontario, Canada C / FP Ontario, Canada Oct 2024 Oct 2024 1 62,710.00 N 2.45) 1820 10K Pallet Truck Electric 2025 Liftking / Ontario C / FP LIFTKING Oct 2024 Oct 2024 2 243,136.00 N Item Number / Title [DODIC] 2.28) 1350 6K Forklift Diesel (25) 2.31) 1325 6K Forklift Propane 2.33) 1370 4K Forklift Electric (27) 2.33) 1370 4K Forklift Electric (27) 2.34) 1370 6K Forklift Electric (28) 2.34) 1370 6K Forklift Electric (28) 2.35) 1433 25K Elevated Platform Diesel 2.36) 1820 6K Pallet Truck Electric (29) 2.36) 1820 6K Pallet Truck Electric (29) 2.37) Non-Powered (30) 2.37) Non-Powered (30) 2.41) 1600 3K Pallet Truck Electric LI 7025 - Supply Equipment Navy O O C P-1 Line Item Number / Title: 7025 / Supply Equipment Location of PCO UNCLASSIFIED Page 16 of 17 Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #127 RFP Issue Date Volume 5 - 136 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 7025 / Supply Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Supply Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 18.145 27.053 0.000 4.719 0.000 4.719 - - - - - - 18.145 27.053 0.000 4.719 0.000 4.719 - - - - - - 18.145 27.053 0.000 4.719 0.000 4.719 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Support - Other Program Cost 1.1) Navy Cash Program - - 6.145 - - 3.153 - - 0.000 - - 3.044 - - 0.000 - - 3.044 - - 12.000 - - 22.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1.400 - - 0.000 - - 1.675 - - 0.000 - - 1.675 Subtotal: Support - Other Program Cost - - 18.145 - - 27.053 - - 0.000 - - 4.719 - - 0.000 - - 4.719 Gross/Weapon System Cost - - 18.145 - - 27.053 - - 0.000 - - 4.719 - - 0.000 - - 4.719 (32) 1.2) Naval Autonomous Data Collection System (NADACS) (33) 1.3) Ordnance Information System (OIS) Tech Refresh (34) Footnotes: (32) NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS (33) NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS (34) NAVSUP's FY26 budget procurement line was erroneously eliminated due to misplaced congressional add for At-Sea Rearm of Vertical Launch System (T2). This eliminated all funding for MHE procurement, the Navy Cash program, and OIS LI 7025 - Supply Equipment Navy UNCLASSIFIED Page 17 of 17 P-1 Line #127 Volume 5 - 137 === page 216 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 138 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7066 / First Destination Transportation Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 82.925 6.463 6.203 4.732 0.000 4.732 4.640 4.760 4.859 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 82.925 6.463 6.203 4.732 0.000 4.732 4.640 4.760 4.859 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - - - - - - - - 82.925 6.463 6.203 4.732 0.000 4.732 4.640 4.760 4.859 To FY 2031 Complete 4.947 Continuing - Continuing - 4.947 Continuing - Total - Continuing - - 4.947 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: First Destination Transportation (FDT). FDT delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of War (DoW) supply system or a DoW activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navy-owned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification. LI 7066 - First Destination Transportation Navy UNCLASSIFIED Page 1 of 3 P-1 Line #128 Volume 5 - 139 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 7066 / First Destination Transportation Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a First Destination Transportation - / 82.925 - / 6.463 - / 6.203 - / 4.732 P-40 Total Gross/Weapon System Cost - / 82.925 - / 6.463 - / 6.203 - / 4.732 - / - - / 4.732 / 0.000 - / 4.732 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding required for transportation costs for shipments of OPN-procured equipment and material to the first point of use or storage, or as Government Furnished Equipment/Government Furnished Material (GFE/GFM) provided to a contractor incidental to an OPN-funded system/equipment acquisition or modification. LI 7066 - First Destination Transportation Navy UNCLASSIFIED Page 2 of 3 P-1 Line #128 Volume 5 - 140 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 7066 / First Destination Transportation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: First Destination Transportation FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) First Destination Transportation 1.1) First Destination Transportation NAVSUP A 1.2) First Destination Transportation Strategic Systems A - - 18.720 - - - - - - - - - - - - - - - - - 2.080 - - 0.211 - - 0.215 - - 0.203 - - - - - 0.203 - - 8.054 - - 0.728 - - 0.542 - - 0.518 - - - - - 0.518 - - 14.515 - - 1.682 - - 1.692 - - 1.437 - - - - - 1.437 - - 6.253 - - 1.194 - - 0.606 - - 0.573 - - - - - 0.573 - - 33.303 - - 2.648 - - 3.148 - - 2.001 - - - - - 2.001 Subtotal: 1) First Destination Transportation - - 82.925 - - 6.463 - - 6.203 - - 4.732 - - - - - 4.732 Total - - 82.925 - - 6.463 - - 6.203 - - 4.732 - - - - - 4.732 Programs (SSP) (1) 1.3) First Destination Transportation NAVWAR A 1.4) First Destination Transportation - CNIC A 1.5) First Destination Transportation NAVAIR A 1.6) First Destination Transportation NAVSEA A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) FY 2027 decrease due to miscellaneous rate adjustments. LI 7066 - First Destination Transportation Navy UNCLASSIFIED Page 3 of 3 P-1 Line #128 Volume 5 - 141 === page 220 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 142 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7069 / Special Purpose Supply Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 8,081.853 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 8,081.853 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 8,081.853 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 985.996 985.996 985.996 666.618 666.618 666.618 323.644 323.644 323.644 0.000 0.000 0.000 323.644 323.644 323.644 294.058 294.058 294.058 680.674 680.674 680.674 To FY 2031 Complete 699.919 699.919 699.919 735.205 Continuing 735.205 735.205 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. [P40A / CLASSIFIED]: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 7069 - Special Purpose Supply Systems Navy UNCLASSIFIED Page 1 of 3 P-1 Line #129 Volume 5 - 143 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 7069 / Special Purpose Supply Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 06: Supply Support Equipment / BSA 1: Supply Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Special Purpose Supply Systems - / 8,081.853 - / 985.996 - / 666.618 - / 323.644 P-40 Total Gross/Weapon System Cost - / 8,081.853 - / 985.996 - / 666.618 - / 323.644 - / - - / 323.644 / 0.000 - / 323.644 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 7069 - Special Purpose Supply Systems Navy UNCLASSIFIED Page 2 of 3 P-1 Line #129 Volume 5 - 144 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 7069 / Special Purpose Supply Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 06 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Special Purpose Supply Systems FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Special Purpose Supply Systems - - 8,081.853 - - 985.996 - - 666.618 - - 323.644 - - - - - 323.644 Subtotal: 1) Special Purpose Supply Systems 1) CLASSIFIED A - - 8,081.853 - - 985.996 - - 666.618 - - 323.644 - - - - - 323.644 Total - - 8,081.853 - - 985.996 - - 666.618 - - 323.644 - - - - - 323.644 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 7069 - Special Purpose Supply Systems Navy UNCLASSIFIED Page 3 of 3 P-1 Line #129 Volume 5 - 145 === page 224 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 146 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8081 / Training Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 10.595 5.341 3.480 10.608 0.000 10.608 1.977 2.003 2.039 2.083 - 38.126 Total - - - - - - - - - - - - 10.595 5.341 3.480 10.608 0.000 10.608 1.977 2.003 2.039 2.083 - 38.126 - - - - - - - - - - - - 10.595 5.341 3.480 10.608 0.000 10.608 1.977 2.003 2.039 2.083 - 38.126 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Battle Stations-21 (BST-21): Located at Recruit Training Command Great Lakes, Illinois, Battle Stations-21 (BST-21) provides an unparalleled, realistic training environment aboard a 210-foot-long Arleigh Burkeclass destroyer. This culminating event immerses recruits in demanding scenarios, ensuring they are prepared for the challenges of serving in the United States Navy. OPN funding aids in the replacement of worn, outdated, or obsolete equipment and technology, termed life-cycle replacement, ensuring the training device remains a relevant and effective training tool. The findings of the February 2015 Life-Cycle Sustainment assessment continue to be relevant today, highlighting the ongoing need for upgrades in Information Assurance/Cybersecurity and Tech Refresh/Upgrades identified by Naval Air Warfare Training Support Division (NAWCTSD). The training focuses on key shipboard skills through realistic simulations, complete with authentic sounds, sights, and smells. This includes: shipboard line handling and stores onloading, missile strikes, mass casualty scenarios with medical response and extraction of distressed manikins, realistic watch standing exercises involving navigation, radar contact identification, engineering equipment monitoring, security sentry duties, and space identification, emergency egress procedures, a flooding event where recruits work as a team to identify and mitigate flooding in a confined space, a man overboard event, and a live firefighting event where recruits, in a coordinated team effort, don firefighting equipment and engage a controlled live fire. Commander, Naval Education and Training Command stated "BST-21 is a mandatory graduation requirement and a Fleet requirement for Block 0 of the Ready, Relevant Learning initiative," marking the completion of the first step in their journey from civilian to sailor, and future Naval enlisted warfighter, in the United States Navy. Small Arms Marksmanship Training Device (SAM-T): Located at Recruit Training Command Great Lakes, Illinois, The Small Arms Marksmanship Training Device (SAM-T) requires a technology refresh to align with the Navy's transition from the M9 to the M18 handgun and support current qualification standards. The acquisition enables full use of 60 firing lanes, doubling throughput, and enhancing training realism prior to a live-fire qualification event. Funding the technology refresh of the SAM-T ensures Recruits train on the same platform used in live-fire, improving readiness and qualification success rates while maintaining compliance with OPNAVINST 3591.1G and DoW Cybersecurity requirements. [P40A / BST-21 AUDIOVISUAL LIGHTING SYSTEMS]: Funding provided for updates to Audiovisual Lighting Systems to train recruits. [P40A / BST-21 SUPPORT SYSTEM]: Funding also provides for upgrades to operating equipment, software modifications, and UPS subsystem; ocean fill valve, pit sump pumps Variable Frequency Drive (VFD) controllers, blocking valve (natural gas) and power panel, pier stores, and tour brief station. LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 1 of 6 P-1 Line #130 Volume 5 - 147 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8081 / Training Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION]: Funding provides for BST-21 Information Assurance Software. Software operating system technical refreshes are required every three to five years to maintain DOW Cybersecurity Security Controls Certification. [P40A / BST-21 SCENIC AND PROPS]: The Scenic and Props requirement provides for the life cycle sustainment plan divided into six separate subcategories: pier front, pier stores, ship exterior, 01 level, main deck, and 2nd deck with over 100 hardware items varying in quantities from 1 to 176 to a generic title of "lot". [P40A / BST-21 TRAINING MANAGEMENT SYSYTEM (TMS)]: Funds provided support for BST-21 systems tech refresh for training management systems, as well as software modifications. [P40A / BST-21 SPECIAL EFFECTS]: Funding to BST-21 Special Effect requirements. [P40A / BST-21 OVERALL SUPERVISORY SYSTEM]: Funding continues to provide refreshes to Overall Supervisory System (OSS) subsystem. [P40A / Small Arms Marksmanship Training Devise]: The Small Arms Marksmanship Training Device (SAM-T) requires a technology refresh to align with the Navy's transition from the M9 to the M18 handgun and support current qualification standards. The acquisition enables full use of 60 firing lanes, doubling throughput, and enhancing training realism prior to a live-fire qualification event. Funding the technology refresh of the SAM-T ensures Recruits train on the same platform used in live-fire, improving readiness and qualification success rates while maintaining compliance with OPNAVINST 3591.1G and DoW Cybersecurity requirements. LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 2 of 6 P-1 Line #130 Volume 5 - 148 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8081 / Training Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Training Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 10.595 - / 5.341 - / 3.480 - / 10.608 - / 10.595 - / 5.341 - / 3.480 - / 10.608 - / - - / 10.608 / 0.000 - / 10.608 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 increased by $7.128 due to inflation, continued upgrade and procurement of BST-21 and Firefighting Trainer IT and replacement of Small Arms Marksmanship Training Devise (SAM-T). LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 3 of 6 P-1 Line #130 Volume 5 - 149 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8081 / Training Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) BATTLE STATIONS-21 (BST-21) 1.1) BST-21 AUDIOVISUAL LIGHTING SYSTEMS A 1.2) BST-21 SUPPORT A 443,333.33 3 1.330 1,537K 1 1.537 - - - 1,340K 366,333.33 3 1.099 - 0.591 - 325,666.67 3 0.977 391,000.00 1 0.391 - - - 783,333.33 3 2.350 892,000.00 1 0.892 - - - - 324,000.00 2 0.648 932,000.00 1 0.932 1,031K 1 1.031 4,644K 1,202K 2 2.403 1,589K 1 1.589 242,000.00 1 0.242 894,000.00 2 1.788 - - - 1,616K 1 1 1.340 - - - 1,340K 1 1.340 - - - - - 0.408 - - - - - - - - 1 4.644 - - - 4,644K 1 4.644 2,022K 1 2.022 - - - 2,022K 1 2.022 1.616 70,000.00 1 0.070 - - - 70,000.00 1 0.070 1 2.124 - - - 2,124K 1 2.124 (1)(†) (†) SYSTEM 1.3) BST-21 INFORMATION ASSURANCE SOFTWARE (†) 1.5) BST-21 TRAINING MANAGEMENT 1 - - - 408,000.00 1 408,000.00 1 0.408 A - - - A SYSYTEM (TMS) (3)(†) 1.6) BST-21 SPECIAL (4)(†) 1.7) BST-21 OVERALL SUPERVISORY SYSTEM 591,000.00 (2)(†) 1.4) BST-21 SCENIC EFFECTS - A MODIFICATION AND PROPS - A A (5) 1.8) Small Arms Marksmanship A - - - - - - - - - 2,124K Subtotal: 1) BATTLE STATIONS-21 (BST-21) - - 10.595 - - 5.341 - - 3.480 - - 10.608 - - - - - 10.608 Total - - 10.595 - - 5.341 - - 3.480 - - 10.608 - - - - - 10.608 Training Devise (6)(†) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) FY27 increased requirements to update Audiovisual Lighting Systems FY27 increase to support system technical refresh. FY27 increased to support systems tech refresh and software modifications FY27 increased funding to support Special Effects in association with BST-21. FY27 decreased due to FY26 Overall Supervisory System (OSS) subsystem refresh. FY27 increased to support Small Arms Marksmanship Training Devise LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 4 of 6 P-1 Line #130 Volume 5 - 150 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 8081 / Training Support Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) C / FP Orlando, FL Mar 2023 Mar 2023 1 371,000.00 N Mar 2022 C / FP Orlando, FL Mar 2024 Mar 2024 1 573,000.00 N Mar 2024 C / FP Orlando, FL Mar 2025 Mar 2025 1 1,537K N Mar 2025 C / FP Orlando, FL Oct 2026 Oct 2026 1 1,340K N Feb 2027 Qty (Each) RFP Issue Date 1) BATTLE STATIONS-21 (BST-21) 1.1) BST-21 AUDIOVISUAL LIGHTING SYSTEMS (1) 1.1) BST-21 AUDIOVISUAL LIGHTING SYSTEMS (1) 1.1) BST-21 AUDIOVISUAL LIGHTING SYSTEMS (1) 1.1) BST-21 AUDIOVISUAL LIGHTING SYSTEMS (1) 1.2) BST-21 SUPPORT SYSTEM 2023 2024 2025 2027 Kupono Govt Services, NAWCTSD (7) / Orlando Kupono Govt Services, NAWCTSD (7) / Orlando Kupono Govt Services, NAWCTSD (7) / Orlando Kupono Govt Services, NAWCTSD (7) / Orlando 2023 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2023 Mar 2023 1 391,000.00 N Mar 2023 2024 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2024 Mar 2024 1 452,000.00 N Mar 2024 2026 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2026 Mar 2026 1 591,000.00 N Mar 2026 2023 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2023 Mar 2023 1 343,000.00 N Mar 2023 2025 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2025 Mar 2025 1 391,000.00 N Mar 2025 2027 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Oct 2026 Oct 2026 1 408,000.00 N Feb 2027 2024 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2024 Mar 2024 1 589,000.00 N Mar 2024 2025 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2025 Mar 2025 1 892,000.00 N Mar 2025 1.5) BST-21 TRAINING MANAGEMENT SYSYTEM (TMS) 2023 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2023 Mar 2023 1 180,000.00 N Mar 2023 1.5) BST-21 TRAINING MANAGEMENT SYSYTEM (TMS) 2024 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2024 Mar 2024 1 468,000.00 N Mar 2024 1.5) BST-21 TRAINING MANAGEMENT SYSYTEM (TMS) 2025 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Mar 2025 Mar 2025 1 932,000.00 N Mar 2025 1.2) BST-21 SUPPORT SYSTEM 1.2) BST-21 SUPPORT SYSTEM 1.3) BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION (2) 1.3) BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION (2) 1.3) BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION (2) 1.4) BST-21 SCENIC AND PROPS 1.4) BST-21 SCENIC AND PROPS (3) (3) (3) LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 5 of 6 P-1 Line #130 Volume 5 - 151 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8081 / Training Support Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 1.5) BST-21 TRAINING MANAGEMENT SYSYTEM (TMS) 2026 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Oct 2025 Oct 2025 1 1,031K N Feb 2026 1.5) BST-21 TRAINING MANAGEMENT SYSYTEM (TMS) 2027 Kupono Govt Services, NAWCTSD / Orlando C / FP Orlando, FL Oct 2026 Oct 2026 1 4,644K N Feb 2027 2025 Kupono Govt Services, NAWC TSD / Orlando, FL C / FP Orlando, FL Mar 2025 Mar 2025 1 1,589K N Mar 2025 2027 Kupono Govt Services, NAWC TSD / Orlando, FL C / FP Orlando, FL Oct 2026 Oct 2026 1 2,124K N Feb 2027 (3) (3) 1.6) BST-21 SPECIAL EFFECTS (4) 1.8) Small Arms Marksmanship Training Devise (6) (Each) RFP Issue Date Footnotes: (7) Battle Stations-21 (BST-21) TTE Life Cycle Sustainment LI 8081 - Training Support Equipment Navy UNCLASSIFIED Page 6 of 6 P-1 Line #130 Volume 5 - 152 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 413.074 413.074 413.074 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 43.126 73.631 76.114 58.536 60.037 - - - 43.126 73.631 - - 43.126 73.631 331.016 - 0.000 - 331.016 - 0.000 - 331.016 0.000 331.016 331.016 331.016 143.288 143.288 143.288 To FY 2031 Complete - - - - 76.114 58.536 60.037 - - - - - 76.114 58.536 60.037 - Total 1,198.822 1,198.822 1,198.822 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: (BSO 60) Training Support Equipment funding provides the Live, Virtual, and Constructive (LVC) training capability necessary to meet critical mission essential requirements for training combat-ready for worldwide operations. The LVC capability includes the training support equipment/systems used in support of and connected to the Navy Continuous Training Capability (NCTE) and all of the equipment/systems required, including all training systems, network equipment, information technology (IT) equipment, communications equipment, Command, Control, Communications, Computers and Intelligence (C4I) systems, and training devices used for LVC training capability. This budget line item also provides the resources to maintain the four (4) Training Support Vessels (TSV) in the Atlantic Fleet. East Coast geography and range encroachment mandate the Atlantic Fleet use TSVs to provide open ocean Opposing Force (OPFOR) (i.e., live fire, target services, electromagnetic emissions, and jamming services) and range services. The Fleet Training Continuum (FTC) instruction directs the Navy to adopt an integrated LVC capability to train Navy forces to high-end threats. Navy procured a fifth (5th) TSV (Operational in FY23) to support the Jacksonville Shallow Water Training Range (JSWTR) and is required to sustain four (4) existing TSVs that support Large Scale Integrated Training Events. Naval Sea Systems Command (NAVSEA) completed a study and solicited Requests for Information (RFI), then determined the best course of action was to obtain an existing American Bureau of Shipping (ABS) certified Offshore Supply Vessel (OSV) for conversion to a TSV configuration. Navy requires all ships to have ABS certification. (BSO 22): At the U.S. Naval Academy, the Academic and Professionally Accredited Enterprise Education Enclave (AEEE) system must ensure the best educated and most qualified junior officers enter the naval service. Planned upgrades and replacements are vital in ensuring graduates are technologically prepared to serve in tomorrow's Fleet and Fleet Marine Force while supporting institutional accreditation and competitiveness with peer institutions. NETC recruits, trains, and delivers Sailors to the fleet. SIPR Datacenter, Training Network (TRANET) and associated equipment provides NETC classified/unclassified internet and provides the network infrastructure and architecture required for delivery, management, and sustainment of Navy training content across the entire NETC training enterprise. Voice Over Internet Protocol (VOIP) required for increase telecom infrastructure modernization across multiple NETC commands. (BSO 70): In accordance with The United States Indo-Pacific Command (INDOPACOM) Pacific Deterrence Initiative (PDI), funding supports procurement, alteration, and employment of up to five Multi-Domain Training Support Vessels (TSV's) to address critical shortfalls of fixed tactical training ranges. These assets will be capable of supporting Joint/Coalition Live, Virtual & Constructive (LVC) training in excess of 300 nautical miles from shore and alleviate restrictions and limitation inherent when operating tethered to CONUS Tactical Training Ranges (TTR's) or in vicinity of United State host nations in the Western Pacific. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 1 of 42 P-1 Line #131 Volume 5 - 153 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TSV's will be equipped to support launch/recovery of training targets, deploy portable training ranges, support LVC operations and have communications and Electronic Warfare equipment necessary to train of forces at the high-tactical. TSVs provide a mobile, portable, Tactical Training Range to support INDOPACIFIC Exercise requirements for Joint and Partner Nation participants. [P40A / [USFFC N7] LIFE CYCLE MANAGEMENT (LCM)]: Funding provides for the phased replacement of hardware and software required within the Navy Continuous Training Environment (NCTE). The NCTE Enterprise provides sustained adherence to cyber security/Information Assurance (IA) certification and accreditation requirements. [P40A / [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD)]: Funding provides for Ballistic Missile Defense (BMD) and Integrated Air Missile Defense (IAMD) mission area Fleet sustainment training and mission rehearsal in theater, allow ships to participate in Navy Component Commander mandated BMD/IAMD exercises while pier side or underway, as well as enhance BMD/IAMD training objective accomplishment in current Fleet Readiness Training Plan (FRTP) underway training events such as Composite Training Unit Exercise (COMPTUEX) and Joint Training Unit Exercise (JTFEX). [P40A / [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA]: Funding provides for Ballistic Missile Defense (BMD) and Integrated Air Missile Defense (IAMD) mission area Fleet sustainment training and mission rehearsal in theater, allow ships to participate in Navy Component Commander mandated BMD/IAMD exercises while pier side or underway, as well as enhance BMD/IAMD training objective accomplishment in current Fleet Readiness Training Plan (FRTP) underway training events such as Composite Training Unit Exercise (COMPTUEX) and Joint Training Unit Exercise (JTFEX). [P40A / [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD)]: Funding provides for Gateway portable embarkation kits (PEKs) for use against the high end A2AD, cyber, Information Warfare (IW), and Electronic Warfare (EW) threat during Carrier Strike Group (CSG) Navy training events/exercises. [P40A / [USFFC N7] NAVAL INTEGRATED FIRE CONTROL - COUNTER AIR (NIFC-CA)]: Funding provides engineering support for Cooperative Engagement Capability (CEC) Interim Training (CIT) System portable embarkation kit (PEK) to support Carrier Strike Group (CSG) Fleet training requirements. [P40A / [USFFC N7] IMPASS SCORING SYSTEM]: Funding provides for the phased replacement of the Integrated Maritime Portable Acoustic Scoring and Simulation (IMPASS) system, programmed for even years. [P40A / [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW)]: Funding provides for procurement of equipment to support Fleet Synthetic Training (FST) at Sea capability for non-Ballistic Missile Defense (BMD) Aegis and Ship Self-Defense System (SSDS) platforms and procurement of Total Ship Training Capability (TSTC) shipboard synthetic radios required for realistic Command and Control (C2) representation in a Live, Virtual, and Constructive (LVC) environment. [P40A / [USFFC N7] EAST COAST NETWORK CONSOLIDATION]: Funding provides technical refresh and sustainment of network consolidation equipment integrating East Coast tactical training ranges and systems with the Navy Continuous Training Environment (NCTE). [P40A / [USFFC N7] WEST COAST NETWORK CONSOLIDATION]: Funding provides technical refresh and sustainment of network consolidation equipment integrating West Coast tactical training ranges and systems with the Navy Continuous Training Environment (NCTE). [P40A / [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & SUSTAIN]: Funding provides for the availability, utility, and long-term viability of Training Support Vessels (TSVs) support to Multi-Ship Group Sail (GRUSL) Exercises, Independent Deployer Certification Exercise (IDCERTEX), Composite Training Unit Exercise (COMPTUEX), and Afloat Training Group (ATG) training events. [P40A / [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING]: Funding provides for classification levels of the Enterprise Network Guard (ENG) Raise the Bar (RTB) solution to be sustained. NCTE Cross Domain Enterprise Solution (NCDES) is required for unit, integrated and advanced training/certification at all Live, Virtual, and Constructive (LVC) training ranges. [P40A / [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2]: Funding provides for consolidation of Tactical Training Range (TTR) networks into the Navy Continuous Training Environment (NCTE) network (i.e., Navy Enterprise Tactical Training Network (NETTN)) to meet Fleet training requirements and network operations and support (communications, systems administrators, and cybersecurity). LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 2 of 42 P-1 Line #131 Volume 5 - 154 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ]: Funding provides for dry docking intervals and regular intermediate maintenance as required by the American Bureau of Shipping (ABS). Dry docking costs have accelerated more than inflation based on several factors: dry dock limitations (fewer interested bidders in a constrained environment), steel pricing schedules and Training Support Vessels (TSV) age. [P40A / [USFFC N7] STRIKE GROUP MARITIME OPEN OCEAN RANGE (SGMOOVR)]: Funding provides an interim solution (via three (3) Fly Away Kits) for deployed Strike Groups (SG) to conduct Live, Virtual, Constructive (LVC) mission rehearsal events in preparation for Combatant Commander's (CCMD) tasking. [P40A / [USFFC N7] NCTE CYBER HARDENING]: Funding provides for the procurement and installation of software and hardware solutions on the Navy Continuous Training Environment (NCTE) to align the Naval Enterprise Tactical Training network (NETTN) with Department of War (DOW) Zero Trust (ZT) cybersecurity requirements. [P40A / [USFFC N7] SURFACE LVC TRAINING]: Funding procures hardware and infrastructure to support increased Live Virtual Constructive (LVC) training event support to Fleet surface units at Fleet concentration centers on both East Coast and West Coast. [P40A / [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ]: Funding provides for support and equipment necessary to field, integrate, operate, and sustain an Iwakuni CVW-5 "Mini-EXCON" LVC training capability for local exercise control of integrated fixed wing aircraft mission trainers and simulators. [P40A / [USFFC N7] LVC CYBER NETWORK NATIONAL SECURITY AGENCY WHOLENESS]: Implement intermediate steps to meet National Security Agency (NSA) Raise the Bar (RTB) standards necessary for Navy Continuous Training Environment (NCTE) cross domain solutions and integration of allies and partners into LVC training events. [P40A / [USFFC N7] LVC NETWORK LIFECYCLE MODERNIZATION]: Live Virtual Constructive (LVC). Program Change: Provides updates to Navy's Combat Tactical Training Network IT database to sustain LVC capabilities. Outcome: Enables larger scales of training and improved flexibility with respect to fidelity to be as dynamic as the fleet's training requirements demand in today's environment. [P40A / FIRE ARMS TRAINING SIMULATOR (FATS)]: Funds provided for procurement of shore-based Firearms Training Simulators (FATS). The simulators provide weapons systems and scenarios for students to train while freely maneuvering and handling weapons. [P40A / YPYTD - TRAINING DELIVERY SERVICES (TDS)]: Virtual Desktop Infrastructure Initiative (VDI). The training enterprise is moving forward with implementing more efficient technologies to meet the training delivery mission via a virtual desktop infrastructure solution. The virtual desktop solution will be implemented over the next several years at each location in lieu of conducting the traditional one-for-one workstation refresh. The goals and benefits of VDI are to establish an agile, sustainable enterprise training delivery environment; standardize the processes, services and technology used to deliver training; improve the enterprise security posture; refresh outdated electronic classroom workstations and operating systems; and provide a solution that enables a streamlined, centralized IT workforce. [P40A / NETC Classroom for Increased Accessions - Instructor Podium Equip]: Funds provided for monitors, instructor podium cables, audio-visual components, SMART Board Interactive Flat Panels, Test Kits, and initial warranty. [P40A / New NETC Classrooms for Incr. Acc.- Cable Infrastructure Upgrades]: Funding supports NETC implementing a Virtual Desktop Infrastructure (VDI) solution that largely eliminates physical workstations in classrooms. Under VDI, students utilize "zero client desktop devices" which provide a user experience similar to physical workstations, without the use of CPU, local storage or Operating Systems. [P40A / TRANET Capability Upgrades - Routing/Switching]: Funding supports TRANET Capability Upgrades. The upgrades support CISCO ISR 4431 and ISCO Catalyst 9410 routing and switching equipment. [P40A / TRANET Capability Upgrades - Wireless]: Funds to support Aruba Controllers, switches and access points for the training network. [P40A / TRANET Capability Upgrades - Base Area Network Upgrades]: Funds provided for Single Mode Fiber Installation - Catalyst 9300L 24p data, Network Advantage, 4x10G Uplink. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 3 of 42 P-1 Line #131 Volume 5 - 155 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / SIPR Data Center Consolidation (DCC)]: NETCs SIPR Datacenter: Provides the hosting for delivery of Sailor 2025/RRL modernized learning content in the classified environment. Supported functions: delivery of classified learning content, instructional content development, and advancement exams for classified ratings. SIPR DC provides support for NETCs portfolio of IT Systems, classified (SIPR/NNPI) training environment and users. Support includes classified infrastructure, physical environment, information assurance security controls, servers and storage. [P40A / SIPR Data Center]: NETC's SIPR Datacenter, provides the hosting for delivery of Sailor 2025/Ready Relevant Learning (RRL) Training modernized learning content in the classified environment. Supported functions: delivery of classified learning content, instructional content development, and advancement exams for classified ratings. SIPR DC provides support to NETC'S portfolio of IT Systems, classified (SIPR/NNPI) training environment and users. Support includes infrastructure, physical environment, information assurance security controls, servers and storage. [P40A / Underwater Equipment]: This funding supports for Cryptologic Technician Maintenance (CTM) and Cryptologic Technician Technical (CTT). Cryptologic Technicians (Maintenance) (CTM) maintain, configure, and install intelligence, tactical cryptologic and ancillary systems used to conduct Information and Cyberspace Operations; design, install, test, certify, troubleshoot, and repair or replace: tactical cryptologic systems, physical security systems, electrical and electronic equipment, antennas, computer systems, networks, and ancillary equipment; implement Information Assurance (IA) policy; manage organizational level maintenance; coordinate repair of command, control, communications, computer, intelligence, surveillance and reconnaissance systems in support of surface, subsurface, air, special warfare, and national consumers. Cryptologic Technicians (Technical) (CTT) conduct Electronic Warfare (EW) in support of National and Commanders' tasking; operate and maintain electronic sensors and computer systems; collect, analyze, exploit, and disseminate Electronic Intelligence (ELINT) in accordance with National and Fleet tasking; provide safety of forces, Indications and Warning (I&W), Information Operations (IO), and Anti-Ship Missile Defense (ASMD); and provide technical and tactical guidance to Warfare Commanders and National consumers in support of surface, subsurface, air, and special warfare operations. [P40A / Tactical Training Simulator for MA A School NTTC Lackland]: Funding supports the procurement of fully immersive simulators, a mock ship and pier structure which includes other equipment and enhancements supporting Ready Relevant Learning training for Master at Arms students. [P40A / Enlisted Accesion Increases for STS Rating]: The Submarine Learning Center requires an additional Submarine Common Operational Analysis and Employment Trainer (COAET) with 2 sets (8 ea set) Virtual Tactical Trainer VTAC with Beam Simulation For Sonar Trainers (BSST) workstations for acoustic operator individual and team training requirements. This requirement is necessary to meet the Navy's FY20 Enlisted Accession Plan for the STS rating. The COAET is a classroom-oriented training device that simulates the controls and displays of the latest available tactical combat control and acoustic systems. COAET provides practical experience of the training applications that do not require a full tactical team trainer. COAET can be rebooted to provide three distinct training modes: Acoustic Analysis Trainer (AAT), Sonar Tactical Decision Aids (STDA) Lab and Team Training. The Phase I COAET utilizes desktop/monitor workstations. This trainer supports team training combining the STS rating with FT Rating Accessions training for practical application in the team training environment. [P40A / [PACFLT N7] Training Support Vessels (TSV)]: Per INDOPACOM direction under the Pacific Deterrence Initiative, funds will procure and employ up to five Multi-Domain Training Support Vessels (TSVs). These assets address critical shortfalls of fixed tactical training ranges by providing a mobile, deep-water platform for high-end Joint and Coalition LVC training. Equipped for target launch/recovery, portable range deployment, and robust Communications/Electronic Warfare capabilities, the TSVs will support complex, multi-domain exercises for U.S. and partner nation forces across the theater. Note: Program was eliminated as part of the FY25 OMIBUS/MILPERS ATR, then reintroduced during PB27 as an INDOPACOM priority. [P40A / Aviation Maintenace Training Equipment]: Information Systems Office (ISO) RRL course modernization for RRL training approach will provide less burden on Fleet Commands warfighting by producing a balanced training focus for first tour requirements. [P40A / OCTAMIT Station Combat Control training system device]: CTC funding for OCTAMIT which is an eight station Combat Control training system device that provides AN/BYG-1 and AN/BQQ-10 tactical software currently employed onboard submarines. It provides operator watch-team training for apprentice/journeyman sailors for ST/FT pipelines. The funds will be used to procure and install Advanced Processor Build (APB) 21 software, updated server room and classroom hardware for the eight (8) OCTAMIT trainers at Naval Submarine School (NSS) Groton. Effort includes material procurement, hardware networking, testing, and labor costs each with a two (2) week install in Groton [P40A / Station Combat Control Training System Device]: FY27 funds ($10.240M) increase for the eight station Combat Control training system device that provides AN/BYG-1 and AN/BQQ-10 tactical software currently employed onboard submarines. It provides operator watch-team training for apprentice/journeyman sailors for ST/FT pipelines. The funds will be used to procure and install Advanced Processor Build LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 4 of 42 P-1 Line #131 Volume 5 - 156 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (APB) 21 software, updated server room and classroom hardware for the eight (8) OCTAMIT trainers at Naval Submarine School (NSS) Groton. Effort includes material procurement, hardware networking, testing, and labor costs each with a two (2) week install in Groton. [P40A / CTC Navy Diver (ND)]: CTC for Navy Diver (ND) to meet operational, support, maintenance, and safety requirements. The ND requirements was approved in August 2025 to accomplish the Accession Modernization training efforts for ND. These courses will deliver technical mastery to new accession sailors to integrate Diving Teams and Commands across six different TYCOM/SYSCOMs to meet operational, support, maintenance, and safety requirements. The major pieces of equipment to purchase are: SNDI Chamber System, Salvage trainer, Afloat BDA/BDR Trainer, CPP Trainer for ATF, Submarine Ballast tank Trainer, and a Dry Dock Shelter trainer [P40A / SNDL Chamber System]: SNDL Chamber System - This is a recompression chamber required for conducting diving operations and chamber operator training. The system is life support equipment to support diving related injuries. [P40A / Transport Craft]: Transport Craft - These crafts are required for transporting NDSTC students to and from a vessel of opportunity where they will conduct modernized open ocean dive training. [P40A / Launch & Recovery System]: Launch & Recovery System - Equipment is the dive stage used for lowering and lifting the diver in and out of the water while conducting surface supplied diving operations. It is installed on both the diving vessel and the Aquatic Training Facility. [P40A / Salvage Trainer]: Salvage Trainer - This is an essential training device that will be utilized subsurface for students to conduct salvage training operations to include patch and pipe work. It provides exposure on utilizing tools underwater. [P40A / CPP Trainer for ATF]: CPP Trainer for ATF - Controllable Pitch Propeller trainer is utilized for providing a training simulator to conduct rigging and removal/installation of a ships propeller blade. [P40A / Submariner Ballast Tank Trainer]: Submariner Ballast Tank Trainer - Simulated trainer used to acclimate a diver into enclosed space environment. This simulates entering and exiting a submarine void. [P40A / Afloat BDA/BDR Trainer]: Afloat BDA/BDR Trainer - This is a simulator used for conducting damage control to prevent a ship from sinking. They will conduct Battle Damage Assessment, pipe repairs, hole patching, and dewatering on a simulated Battle Damage Repair trainer. [P40A / 12K TELEHANDLER Forklift]: 12K TELEHANDLER Forklift - This is required for moving large simulated trainers, diving equipment, and diver life support systems. [P40A / Lightweight Hot Tap Training Kit System]: Lightweight Hot Tap Training Kit System - The hot tap trainer is a specialized tool used in the oil and salvage industries for removing fuel from sunken vessels. It operates by drilling a hole into the hull of the vessel and injecting heat to liquefy the fuel, allowing it to flow out more easily. This method is effective for removing pollutants from the tanks of sunken vessels and is a common practice in salvage operations. [P40A / Diver Augmented Vision Display (DAVD)]: Diver Augmented Vision Display (DAVD) - The Diver Augmented Vision Display (DAVD) is a complete end-to-end diver management solution incorporating critically a high-resolution see-through head-up display (HUD) embedded directly inside the diving helmet. [P40A / Defender ROV Program of Record]: Defender ROV Program of Record - This is an underwater remotely operated vehicle used for conducting searching and inspection operations in multiple subsea environments. [P40A / Handheld Sonar Shark Marine HHSD Navigator]: Handheld Sonar Shark Marine HHSD Navigator - This is a program of record tool used as a Sonar Imaging and Navigation System for divers. It is required for students to conduct training on the system. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 5 of 42 P-1 Line #131 Volume 5 - 157 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Dry Deck Shelter Trainer]: Dry Deck Shelter Trainer - a removable module that can be attached to a submarine to allow divers easy exit and entrance while the boat is submerged. The trainer provides realistic training in a controlled environment. [P40A / Dive Propulsion Device]: Dive Propulsion Device - Diver propulsion device is a battery-powered, propeller-driven underwater vehicles designed to assist divers in moving through water more efficiently. It is required for the divers to learn the system and works with the Shark Marine for conducting underwater navigation. [P40A / JFD Maintenance]: JFD Maintenance - This is funding to procure replacement parts and equipment to support maintenance and initial setup for the Shadow Excursion Underwater Breathing Apparatus. [P40A / Shadow Excursion JFD]: Shadow Excursion JFD - is a semi-closed circuit nitrox Underwater Breathing Apparatus (UBA) that can be configured as a combined oxygen/nitrox UBA. This system will be used and maintained by the divers while conducting operations in support of Naval Special Warfare. [P40A - 2 / U.S. Naval Academy (USNA)]: The U.S. Naval Academy mission is to develop midshipmen morally, mentally and physically and to imbue them with the highest ideals of duty, honor and loyalty in order to graduate leaders who are dedicated to a career of naval service and have potential for future development in mind and character to assume the highest responsibilities of command, citizenship and government. The Academic and Professionally Accredited Enterprise Education Enclave (AEEE) system must ensure the best educated and most qualified junior officers enter the naval service. The Naval Academy must maintain the highest standards in academic disciplines and supporting infrastructure. Planned upgrades and replacements are vital in ensuring graduates are technologically prepared to serve in tomorrow's Fleet and Fleet Marine Force while supporting institutional accreditation and competitiveness with peer institutions. System supports the sole Navy undergraduate degree-granting higher education command. Hybrid network enclave serves as a dynamically variable resource for multifaceted teaching, education, and research activities in a blended physical/virtual campus environment similar to four-year civilian universities. Functionality includes collegiate-level admissions outreach, curriculum development, course delivery, pedagogical research, extra-curricular activities, and intercollegiate sports [P40A - 2 / Universal Wireless Telecommunications System]: Funding provided for LCM upgrades of telecom system from LTE to 5G within the Academic and Administrative buildings. Upgrades will enhance the new 5G services and coverage. [P40A - 2 / Satellite Validation Testing System]: The testing system that performs various required validation tests is past its operation life, and is in need of a refresh. [P40A - 2 / Metallography lab suite]: The equipment in the metallography lab supports sample preparation for a wide range of materials classes and projects. [P40A - 2 / Autoclave]: The autoclave was purchased in the wake of TS Isabel (FY2004). The high-pressure system failed in FY19. The computer control and data acquisition system are over 15 years old. Need to reinvest in the computer control/data acquisition hardware and software. [P40A - 2 / Electro-mechanical test equipment data acquisition and control system]: The computer control/data acquisition for most of the test machines is out of date, most of the systems were last updated in 2004 after TS Isabel. [P40A - 2 / Aruba NAC Wireless Expansion]: The replacement system will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. [P40A - 2 / Aruba Switches]: The acquisition will be the LCM of equipment that is reaching its end of serviceable life. The replacement system will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. [P40A - 2 / Atomic Force Microscope System]: Required instrument to avoid USNA department being severely limited in teaching and research capabilities. Having the capability of a state-of-the-art AFM is extremely vital to the success of an ACS-certified Chemistry major, midshipman research experience, and faculty research program. [P40A - 2 / Bancroft QOL Wireless Internet]: Replacement system will facilitate faster, more secure and more reliable quality of life bandwidth for Midshipman in their living quarters. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 6 of 42 P-1 Line #131 Volume 5 - 158 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A - 2 / Bridge Simulator Upgrades]: This simulator is primarily used for the various seamanship and navigation classes taught throughout a midshipmen's time at the academy. [P40A - 2 / Confocal Microscope System]: A confocal microscope system is a critical tool for both material science and understanding biochemical processes at the cellular level. It allows non-invasive, threedimensional imaging of structures in both materials and living cells. [P40A - 2 / F5 Load Balancers]: The acquisition will be the Life Cycle Management (LCM) of equipment that is reaching its end of serviceable life. The replacement system will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. [P40A - 2 / MALDI TOF Mass Spectrometer]: This mass spectrometer is extensively used by the Chemistry Department biochemistry faculty for its unique ability to acquire mass spectra of large molecules such as proteins by laser desorption ionization. Allows for continued experiments and research within the curriculum of USNA. [P40A - 2 / Polarimetric Phase Array Weather Radar]: This weather radar instrument will provide the Ocean and Atmospheric Sciences Department and USNA with a weather radar capability that combines the capabilities of Doppler radar with dual polarization, or polarimetric weather radar technology. [P40A - 2 / IVER Ecomapper with Inertial Navigation]: The Ecomapper AUV was acquired by the Oceanography Department in FY16 and is due for replacement in FY26. [P40A - 2 / Optical microscope and imaging software]: The Materials lab has various optical microscopes and indenters of various scales that are regularly used to sample inspection and characterization both for teaching and research purposes. [P40A - 2 / Telephone Switch Infrastructure]: 2.55 [BUPERS] Telephone Switch Infrastructure - FY27 increase ($1.309M); The acquisition will replace old telecommunication equipment on the USNA Enterprise Enclave that are reaching end of serviceable life. The replacement devices will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. [P40A - 2 / Avaya Phone System Upgrade]: Life Cycle of critical telephone service system before existing gear is end of life/end of support. Will support tenants on USNA and Naval Station Annapolis. [P40A - 2 / Land Room Video Surveillance and Security]: The acquisition will provide surveillance and security in Ward Hall G18. [P40A - 2 / Machine Learning GPU Server]: Current computing and GPU capabilities significantly limit the Computer Science Department's ability to leverage the latest architectures, methods and practices of AI. Modern applications have made a substantial step forward with accessible software to implement solutions; however, the hardware requirements for those solutions far outstrip our current computing capabilities. Methods and practices, such as Transformers, U-Nets, Generative Adversarial Networks (GANs), Bayesian Neural Networks (BNNs), and Deep Reinforcement Learning, are within the capacity of our students to understand and are becoming the norm in undergraduate programs; however, our hardware limitations severely restrict our ability to teach and apply these modern techniques to current real-world, tangible Naval and DoW problems. Advanced high-performance computing servers with state-of-the-art GPUs (2 NVIDIA H200 HGX GPU with 1TB RAM) that can handle class-sized numbers of users simultaneously are the proposed solution. This enables a single-sign on with guaranteed uptime and hands-on educational experiences and research in AI, including machine learning and natural language processing, with enough computing power and memory for students and faculty. The acquisition of GPU servers would enable a transformation of current classes such as SI470 Machine Learning and Data Science, SD312 Machine Learning, SI425 Natural Language Processing (NLP) and SI458 High Performance Computing (HPC), the implementation of cutting-edge new courses applying ML to hard problems, and to support Midshipmen's individual research and capstone projects. One of the roadblocks that inhibited progress across CS/DS capstone projects this year was insufficient GPU memory and processing availability. Access to GPUs with sufficient memory and compute power would equip the midshipmen to produce high-caliber projects implementing modern techniques and architectures. Additionally, with access to GPU servers, professors will be able to introduce their students to state-of-the-art techniques, architectures, and models in ML and NLP using real-world data and problems instead of simple toy datasets. In USNA Machine Learning courses, advanced neural network projects are limited to basic examples of neural networks with small datasets. With these GPU servers, USNA can use the latest neural network architectures on complex and relevant Navy and DoW datasets and problems. Where before projects were severely limited by GPU memory and compute, these will now be within reach for student exploration and faculty demonstration. Our curriculum in natural language processing similarly teaches the architectures underlying ChatGPT, but we are unable to give realistic assignments because we lack the required GPU hardware. In the HPC class, students will be able to simulate and model real life DOE and DoW applications, e.g., Finite Element Method for aircraft structure, aerodynamics and flight dynamic analysis. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 7 of 42 P-1 Line #131 Volume 5 - 159 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A - 2 / Ultra-Low Background Gamma Spectrometer]: n ultra-low background gamma spectrometer consists of a liquid nitrogen-cooled, fixed geometry germanium crystal gamma emission detector with a ultra-low background lead shielding and a solid state control system and digital signal processor. The ultra-low background gamma spectrometer will enable the measurement of naturally-occurring and anthropogenic gamma-emitting radioisotopes (I-131, Be-7, Cs-137, Th-234, Pb-210) in liquid and solid matrices such as natural waters, soils, and sediments at or near background environmental background levels. Radioisotopes can serve as both tracers and clocks for applications such as identifying and tracing radioactive releases; tracing water masses and suspended particulates; conducting sediment transport studies; determining sedimentation and sediment mixing rates; identifying sediment distribution (focusing and erosion); and creating sediment and contaminant geochronologies. The system will complement existing analytical capabilities and significantly advance research potential teaching and research opportunities in the USNA DOAS. It will enable faculty and students to better understand environmental radioactivity, sediment transport, sediment deposition, and sedimentation and contaminant legacies in coastal waters. It will support faculty and faculty-led Midshipman research and hands-on Capstone projects focused on sediments and contaminants in coastal waters leading to new, exciting, and operationally-relevant Independent Research and project-based Capstones for USNA Oceanography majors and other collaborative research opportunities. It will provide data for use in core classes courses like SO351: Biogeochemical Oceanography and upper level electives like SO422: Nearshore Oceanography; SO461: Geological Oceanography; and SO427: Introduction to Estuarine Oceanography. The instrument could also provide value to USNA Midshipmen and faculty interested in environmental radioactivity, contaminant legacies, and environmental biogeochemistry. [P40A - 2 / Wind Tunnel External Force Balance System]: A pyramidal force balance is a precision instrument used in wind tunnels to measure aerodynamic forces and moments such as lift, drag, and pitch, acting on a scale model during airflow testing. It features a rigid, pyramid-like structure with load cells that provide accurate, multi-axis data. For aerospace students, it offers hands-on experience with real-world aerodynamic testing and data analysis, deepening their understanding of flight mechanics, aerodynamic principals and experimental methods [P40A - 2 / X-Ray Fluorescence Instrument]: The X-Ray Fluorescence (XRF) Spectrometer has become an increasingly popular instrument for performing non-destructive analysis on both student and faculty samples, as well as samples being studied across the Yard and throughout the Navy. The XRF supports the chemistry major integrated lab sequence, in both SC361 and SC364. Chemistry majors collect and analyze XRF spectra of their synthesized superconductor pellets and also use the spectral output to compare as a Case II study to their Brass samples. The instrument is used by several researchers in Chemistry and collaboratively with the Museum to analyze metals and pigments in centuries old tapestries and metal artifacts. Additionally, a Naval Archeologist from the Naval History and Heritage Command, analyzed aircraft components recovered from an underwater site. Given the variety of applications and the fact that XRF is a non-destructive technique for metal analysis, it is a valuable analytical instrument. The instrument has lost some functionality of its camera systems over the years -unfortunately the repair costs are not feasible. If the instrument loses its last camera it will be unusable. The software package has also become outdated and cumbersome. [P40A - 2 / Modular COOP Site]: Life Cycle management of COOP site located at hospital point in order to rapidly respond and restore the network to ensure continuity of operations. COOP site ensures that the network would never go down completely. If the network has been taken down (planned outages), mission operations can continue. Hospital Point is a superior location for COOP due to its environmental advantage and available space while meeting DoW 3020.26, COOP Policy and Planning guidance [P40A - 2 / Dishwasher]: Life cycle management of a dishwasher procurement that supports Midshipmen Food Services Division (MFSD). It is an automatic circular washing machine for pots, pans and utensils that 4,400 Midshipmen are utilizing throughout the day all year long. [P40A - 2 / Sustain Hopper Hall Technology]: Hopper Hall represents a Navy/Government strategic investment to produce a superior foundation in the global domain of Cyber warfare and represents a strategic focus to strengthen warfighting readiness and capabilities in which Cyber warfare will become an increasing factor. Hopper Hall will become an asset where Government, Industrial and Military leaders will inform future generations of Naval Officers to create an optimum platform to prepare and defend against this growing and evolving threat. The center will be the first building on the Yard with a SCI capability. [P40A - 2 / USNA Sailboat Recapitalizaton]: Replace aging fleet of sailboats in support of USNA midshipmen training in the maritime environment. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 8 of 42 P-1 Line #131 Volume 5 - 160 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Training Support Equipment P-5a, P-21 - / 398.150 - / 37.807 - / 66.663 - / 312.450 - / - - P-40a Education Support Equipment P-5a - / 14.924 - / 5.318 - / 6.968 - / 18.566 - / - - / 18.566 P-40 Total Gross/Weapon System Cost - / 413.074 - / 43.126 - / 73.631 - / 331.016 / 0.000 - / 331.016 - / 312.450 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 8101 Justifications FY27 funds ($257.4M) increase to procure and employ up to five Multi-Domain Training Support Vessels (TSVs), eight station Combat Control training system devices and meet operational, support, maintenance, and safety requirements. These assets address critical shortfalls of fixed tactical training ranges, provides AN/BYG-1 and AN/BQQ-10 tactical software currently employed onboard submarines and accomplish the Accession Modernization training efforts for ND (Navy Diver). 1.1 [USFFC] LIFE CYCLE MANAGEMENT (LCM) - FY27 ($0.804M) increase due to hardware and software procured in FY26 required within the Navy Continuous Training Environment (NCTE). 1.2 [USFFC] BALLISTIC MISSILE DEFENSE (BMD) - FY27 ($0.694M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. 1.3 [USFFC] BALLISTIC MISSILE DEFENSE (BMD) FLEET SYNTHETIC TRAINING (FST) at Sea - FY27 funds ($0.052M) increase due to software and hardware Life Cycle Management (LCM) requirements. 1.4 [USFFC] ANTI-ACCESS AREA DENIAL (A2AD) -FY27 funds ($0.081M) increase due to software and hardware Life Cycle Management (LCM) requirements. 1.5 through 1.6 N/A 1.7 [USFFC] NAVAL INTEGRATED FIRE CONTROL - COUNTER AIR (NIFC-CA) - FY27 funds ($0.226M) increase due to software and hardware Life Cycle Management (LCM) requirements. 1.8 [USFFC] INTEGRATED MARITIME PORTABLE ACOUSTIC SCORING AND SIMULATION (IMPASS) SYSTEM - FY27 funds ($0.527M) decrease due to even-numbered FY funding for phased replacement of Integrated Maritime Portable Acoustic Scoring and Simulation (IMPASS) system. 1.9 [USFFC] LVC FLEET TRAINING WHOLENESS (FTW) - FY27 funds ($1.589M) increase due to Life Cycle Management (LCM) requirements in FY26 investments. 1.10 [USFFC] EAST COAST TRAINING NETWORK CONSOLIDATION - FY27 funds ($1.864M) increase due to expansion software and hardware Life Cycle Management (LCM) requirements. 1.11 [USFFC] WEST COAST TRAINING NETWORK CONSOLIDATION - FY27 funds ($0.695M) increase due to software and hardware Life Cycle Management (LCM) requirements. 1.12 N/A 1.13 [USFFC/ CSG4] TRAINING SUPPORT VESSEL (TSV) PROCUREMENT & SUSTAINMENT - FY27 ($0.150M) decrease system procurement completed in FY26. Amount reduced for transition sustainment. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 9 of 42 P-1 Line #131 Volume 5 - 161 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 1.14 through 1.19 N/A 1.20 [USFFC] NCTE CROSS DOMAIN ENTERPRISE SOLUTION FOR LVC TRAINING - FY27 funds ($0.614M) increase due to an expansion of software and hardware Life Cycle Management (LCM) requirements. 1.21 N/A 1.22 [USFFC] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2 - FY27 funds ($0.198M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. 1.23 [USFFC/ CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJUSTMENT - FY27 funds ($0.096M) decrease due to backlog dry docking intervals and regular intermediate maintenance as required by the American Bureau of Shipping (ABS). 1.24 [USFFC] STRIKE GROUP MOBILE OPEN OCEAN VIRTUAL RANGE (SGMOOVR) - FY27 funds ($1.750M) decrease based upon level two-year procurement and installation of hardware and software requirements to enable LVC training during Advanced and Integrated Phase deployment work-ups and flexibility for enroute deployment LVC training. Funding provides an interim solution (via three (3) Fly Away Kits) for deployed Strike Groups (SG) to conduct Live, Virtual, Constructive (LVC) mission rehearsal events in preparation for Combatant Commander's (CCMD) tasking. 1.25 [USFFC] NCTE CYBER HARDENING - FY27 funds ($9.200M) decrease during FY27 - FY29 as funding is not required until FY30 when funds ($1.900M) shall increase. 1.26 [USFFC] SURFACE LVC TRAINING - FY27 funds ($7.386M) decrease based on the reduction of required hardware needed for Surface Live Virtual Constructive (LVC) training program capability. Funding procures hardware and infrastructure to support increased Live Virtual Constructive (LVC) training event support to Fleet surface units at Fleet concentration centers on both East Coast and West Coast. 1.27 [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ - FY27 funds ($0.015M) decrease due to the FY26 procurement of Live, Virtual, and Constructive (LVC) training capability requirements for Carrier Wing Five (CVW-5). 1.28 [USFFC N7] LVC CYBER NETWORK NATIONAL SECURITY AGENCY WHOLENESS - FY27 funds ($0.900M) increase due to a new start to provide sequential updates to meet RTB standards by 2031. 1.29 [USFFC N7] LVC NETWORK LIFECYCLE MODERNIZATION - FY27 funds ($0.800M) increase due to a new start to update outdated NCTE systems including NETTN IT (includes modernization of database architectures, network configuration and management tasks), NTB applications (updates to enable larger scales of training, improves flexibility with respect to updates to threats and threat models, interoperability, data management and resources utilization and management) and Interoperability tools. 1.30 [BUPERS] FIREARMS TRAINING SIMULATOR (FATS) - FY27 funds ($0.316M) decrease provide for procurement of shore-based Firearms Training Simulators (FATS) at Center for Submarine Learning (CSL) to reduce time and energy expended for small arms proficiency by personnel assigned to small ships and submarines that lack this capability afloat. These un-tethered weapons systems and scenarios place the students into action and afford them the ability to freely maneuver and handle the weapons. 2.10 [BUPERS] NAVAL EDUCATION AND TRAINING COMMAND (NETC) CLASSROOM FOR INCREASED ACCESSIONS - Instructor Podium Equip: FY27 funds ($0.964) decrease due to price cost for monitors, cables, audiovisual components etc. 2.13 [BUPERS] NAVAL EDUCATION AND TRAINING COMMAND (NETC) CLASSROOM FOR INCREASED ACCESSIONS - Cable Infrastructure Upgrades: FY27 funds ($0.376M) increase supporting NETC implementing a Virtual Desktop Infrastructure (VDI) solution that largely eliminates physical workstations in classrooms. Under VDI, students utilize "zero client desktop devices" which provide user experience similar to physical workstations, without the use of CPU, local storage or Operating Systems. This transformation effort will reduce the number of fielded networking solutions via implementation of standard equipment configurations. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 10 of 42 P-1 Line #131 Volume 5 - 162 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 2.16 [BUPERS] TRAINING NETWORK (TRANET) CAPABILITY UPGRADES - ROUTING/SWITCHING - FY27 funds ($0.465M) decrease support of upgrades to CISCO ISR 4431 and ISCO Catalyst 9410 routing and switching equipment. Funding profile changes are a result of multi-phased strategy for major and different components of the training network. 2.17 [BUPERS] TRAINING NETWORK (TRANET) CAPABILITY UPGRADES - WIRELESS - FY27 funds ($0.290M) decrease due to price costs and less upgrades required to support Aruba Controllers, switches and access points for the training network. 2.19 [BUPERS] TRAINING NETWORK (TRANET) CAPABILITY UPGRADES - NETWORK SWITCH UPGRADES GREAT LAKES: FY27 funds ($0.469M) decrease supports requirement costs for site survey and single mode fiber installation. The funding profile changes are a result of multi-phased strategy for major and different components of the training network. 7.1 [BUPERS] SIPR DATA CENTER CONSOLIDATION - FY27 funds ($0.967) decrease for sustainment of data center hardware, software, and licenses for established Component Enterprise Data Centers (CEDCs) and other approved hosting locations as part of the Department of Defense's Information Technology efficiency for the Manpower, Training, and Education (MPT&E) Data Center footprint. The funding enables the MPT&E to implement the Navy Data Center and Commercial Cloud Resourcing Memorandum of Agreement. Funding will procure servers (encompassing both hardware and software components), ancillary equipment associated with the servers (racks, cables, switches, etc.), and integration and installation efforts as needed to meet additional hosting requirements as consolidated applications are hosted in approved hosting locations, and as a part of regular data center technical refresh. Regular technical refresh is required to maintain cyber security readiness and accreditation at the data centers. 9.1 [BUPERS] MARITIME EXPEDITIONARY STANDOFF RESPONSE (MESR) - FY27 funds ($1.700M) decrease for one time support of NAVIFOR efforts: ISO RRL- CTM Career Long Learning Continuum (CLLC), and NECC's effort: EOD content conversion. This also supports AIRFOR: The Avionics Maintenance Trainer (AMT) is designed to replicate current fleet avionics equipment in a lab environment, particularly for the MH-60R (MH-60R Avionics Systems Organizational Initial Maintenance Technician) systems. The trainers are intended to bridge the gap between classroom learning and hands-on experience in the fleet, enabling maintainers to operate and repair the avionics systems found on the MH-60R, such as Data, Video, and Audio Recorder Systems, Display Units for Night Vision Devices, Helmet Mounted Displays, Helmet Display Tracker, Systems, Air Navigation and Communication Systems. 14.1 [PACFLT] - PACIFIC MULTI-DOMAIN TRAINING AND EXPERIMENTATION CAPABILITIES RANGE NAVY - FY27 funds ($235.192M) increase to procure and employ up to five Multi-Domain Training Support Vessels (TSVs). These assets address critical shortfalls of fixed tactical training ranges by providing a mobile, deep-water platform for high-end Joint and Coalition LVC training. Equipped for target launch/recovery, portable range deployment, and robust Communications/Electronic Warfare capabilities, the TSVs will support complex, multi-domain exercises for U.S. and partner nation forces across the theater. 16.1 [BUPERS] CTM CAREER LONG LEARNING CONTINUUM (CLLC) - FY27 funds ($1.700M) decrease for one time support of NAVIFOR efforts: ISO RRL- CTM Career Long Learning Continuum (CLLC), and NECC's effort: EOD content conversion. This also supports AIRFOR: The Avionics Maintenance Trainer (AMT) is designed to replicate current fleet avionics equipment in a lab environment, particularly for the MH-60R (MH-60R Avionics Systems Organizational Initial Maintenance Technician) systems. The trainers are intended to bridge the gap between classroom learning and hands-on experience in the fleet, enabling maintainers to operate and repair the avionics systems found on the MH-60R, such as Data, Video, and Audio Recorder Systems, Display Units for Night Vision Devices, Helmet Mounted Displays, Helmet Display Tracker, Systems, Air Navigation and Communication Systems. 17.1 [BUPERS] MULTIPURPOSE RECONFIGURABLE TRAINING SYSTEM - FY27 funds ($1.000M) decrease which provided NAVIFOR a one time cost for functional requirements document support of CTT accession pathway modernization. These funds will facilitate the purchase of a Multipurpose Reconfigurable Training System maintenance and operations training. 17.2 [BUPERS] TACTICAL SIMULATORS - FY27 funds ($1.000M) decrease which provided NAVIFOR a one time cost for functional requirements document support of CTT accession pathway modernization. These funds will facilitate the purchase of a Multipurpose Reconfigurable Training System maintenance and operations training. 18.1 [BUPERS] AVIONICS MAINTENANCE TRAINER (AMT) DEVELOPMENT AND DESIGN - FY27 funds ($4.269M) decrease for one time requirements stem from the need to support the development and design of the Avionics Maintenance Trainer (AMT) in alignment with the updated specifications outlined in the Functional Requirements Document (FRD). This is critical for associated risk mitigation, implementation readiness, and infrastructure alignment to ensure the AMT can be delivered and fielded on time and in accordance best practices. This includes mitigation of cost, schedule, and technical risks identified during early planning reviews, as well as necessary integration planning for initial deployment sites. FY26 funding adjustments support the development of AMT specifications, including the purchase LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 11 of 42 P-1 Line #131 Volume 5 - 163 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 1: Training Devices ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8101 / Training and Education Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A and integration of necessary equipment for training ($2million), which will enable maintainers to meet operational and performance objectives. The AMT will allow for the following: Hands-on training with the latest avionics systems in a controlled lab environment, improved training and maintenance readiness, helping bridge the gap between theory and actual maintenance work, support for the development of new maintainers to be integrated into the fleet for completion of the first 4 units. The AMT is a critical element in developing maintainers who can operate and repair the current fleet's avionics equipment. The procurement is in line with modernization objectives and mission requirements, enabling the fleet to maintain operational readiness. Training objectives supports performance objective completion for: Advanced Data Transfer Systems, Helmet Display Tracker Systems, Air Navigation and Communication Systems. 19.1 [BUPERS] OCTAMIT Station Combat Control Training System Device - FY27 funds ($10.240M) increase for the eight station Combat Control training system device that provides AN/BYG-1 and AN/ BQQ-10 tactical software currently employed onboard submarines. It provides operator watch-team training for apprentice/journeyman sailors for ST/FT pipelines. The funds will be used to procure and install Advanced Processor Build (APB) 21 software, updated server room and classroom hardware for the eight (8) OCTAMIT trainers at Naval Submarine School (NSS) Groton. Effort includes material procurement, hardware networking, testing, and labor costs each with a two (2) week install in Groton. 20.1 through 20.16 [BUPERS] NAVY DIVER (ND) - FY27 funds ($23.726M) increase to meet operational, support, maintenance, and safety requirements. The ND requirements were approved in August 2025 to accomplish the Accession Modernization training efforts for ND. These courses will deliver technical mastery to new accession sailors to integrate Diving Teams and Commands across six different TYCOM/ SYSCOMs to meet operational, support, maintenance, and safety requirements. The major pieces of equipment to purchase are: SNDI Chamber System, Salvage trainer, Afloat BDA/BDR Trainer, CPP Trainer for ATF, Submarine Ballast tank Trainer, and a Dry Dock Shelter trainer. ========================================================================================================================== FY27 Education Support Equipment Changes 2.27 [BUPERS] Hydro Data Acquisition Equipment Upgrade - FY27 funds ($0.550M) increase to replace and update obsolete data acquisition equipment for the towing tank measuring equipment. 2.51 [BUPERS] Hover Test Rotor Hub - FY27 funds ($0.654M) increase the Hover Test Stand Rotor Hub, life cycle replacement of the motor, rotor force balancer, articulated rotor hub and set of composite rotor blades used for instruction of Aerodynamics, Fluids and Propulsion. 2.53 [BUPERS] CAC Reader System - FY27 funds ($0.300M) increase replace Common Access Card Reader System for Bancroft Hall. 2.54 [BUPERS] Firewalls - FY27 funds ($0.400M) increase the acquisition will replace old equipment on the USNA Enterprise Enclave that are reaching end of serviceable life. The replacement devices will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. 2.55 [BUPERS] Telephone Switch Infrastructure - FY27 funds ($0.362M) increase the acquisition will replace old telecommunication equipment on the USNA Enterprise Enclave that are reaching end of serviceable life. The replacement devices will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. 2.56 [BUPERS] Wireless Measurement Lab -FY27 funds ($0.300M) increase the wireless measurements system is used to characterize the interaction of wireless signals with the physical environment, enabling Faculty and Midshipmen research as well as providing state-of-the-art classroom instruction. The new system will enable us to expand our capabilities to characterize new frequency bands of interest for 6G communications as well as current and future Navy operations. 4.1 [BUPERS] USNA Sailboat Recapitalization - FY27 funds ($16.000M) increase replace aging fleet of sailboats in support of USNA midshipmen training in the maritime environment. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 12 of 42 P-1 Line #131 Volume 5 - 164 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code 1) Training and Education Equipment 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (1) A 2,250K 8 18.002 2,863K 1 2.863 2,812K 1 2.812 3,616K 1 3.616 - - - 3,616K 1 3.616 1,959K 7 13.712 2,602K 1 2.602 2,595K 1 2.595 3,289K 1 3.289 - - - 3,289K 1 3.289 186,000.00 8 1.488 195,000.00 1 0.195 194,000.00 1 0.194 246,000.00 1 0.246 - - - 246,000.00 1 0.246 257,725.00 40 10.309 302,000.00 1 0.302 301,000.00 1 0.301 382,000.00 1 0.382 - - - 382,000.00 1 0.382 312,000.00 2 0.624 - - - - - - - - - - - - - - - 1,224K 3 3.671 - - - - - - - - - - - - - - - 598,000.00 8 4.784 846,000.00 1 0.844 1,070K 1.070 - - - 1,070K 931,750.00 4 3.727 - 527,000.00 1 0.527 - - - - - - 11,273K 4 45.091 5,770K 1 5.770 5,754K 1 5.754 7,343K 1 7.343 - - - 7,343K 1 7.343 5,498K 6 32.987 6,771K 1 6.771 6,751K 1 6.751 8,615K 1 8.615 - - - 8,615K 1 8.615 3,288.78 10,004 32.901 2,610K 1 2.610 2,604K 1 2.604 3,299K 1 3.299 - - - 3,299K 1 3.299 (2)(†) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) A 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT A (3)(†) SEA (4)(†) 4) [USFFC N7] ANTIACCESS AREA DENIAL (A2AD) A (5)(†) 5) [USFFC N7] COMMON DATA LINK (CDL) A 6) [USFFC N7] DIGITAL RADIO MANAGEMENT SYSTEM (DRMS) WHOLENESS A 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL - COUNTER AIR A (NIFC-CA) 0.846 844,000.00 1 1 1.070 (6)(†) 8) [USFFC N7] IMPASS SCORING SYSTEM 1 A (7)(†) 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) A 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION A 11) [USFFC N7] WEST COAST NETWORK A - - - - - (8)(†) (9)(†) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 13 of 42 P-1 Line #131 Volume 5 - 165 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] CONSOLIDATION ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (10)(†) 12) [USFFC N7] AVIATION TRAINING & MISSION REHEARSAL SECURITY A 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & A SUSTAIN 5,986K 2 11.973 - 5,662K 5 28.310 3,562K 3,200K 3 9.600 - 1,939K 3 5.816 300,000.00 5 1,200K - - - - - 3.562 3,630K 3.630 3,480K - - - - - - - - - - - - 1.500 - - - - - 5 6.000 - - - - 4,000K 1 4.000 - - - 850,000.00 3 2.550 - - 3,788K 3 11.363 2,703K 1,367K 1 1.367 - 1 - - - - - - 3.480 - - - 3,480K - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.703 2,803K 2.803 3,417K 3.417 - - - 3,417K - - - - - - - - - 1 - 1 - - 1 3.480 (11)(†) 14) [USFFC N7] TRAINING SUPPORT VESSEL (TSV) COMMS NETWORK SUITE A 15) [USFFC N7] NCTE SPECIAL ACCESS TRAINING A NETWORK (†) 16) [USFFC N7 OCO] TRAINING SUPPORT VESSEL (TSV) HM&E C5I SUPPORT A 17) [USFFC N7 OCO] TACTICAL TRAINING RANGE LVC SYSTEMS A 18) [USFFC N7 OCO] TRAINING SUPPORT VESSEL FIVE (TSV-5) PSG CBSP SYS A 19) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) CRANE UPGRADES A 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING A 21) [USFFC N7 / CSG4] NAVAL SURFACE FIRE SUPPORT (NSFS) IN-HOUSE TRAINER A 1 1 1 1 3.417 (12)(†) LI 8101 - Training and Education Equipment Navy - - UNCLASSIFIED Page 14 of 42 - P-1 Line #131 - - Volume 5 - 166 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 22) [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION A PHASE 2 MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2,392K 3 7.177 740,000.00 1 0.740 738,000.00 1 0.738 936,000.00 1 0.936 - - - 936,000.00 1 0.936 1,968K 2 3.935 775,000.00 1 0.775 776,000.00 1 0.776 680,000.00 1 0.680 - - - 680,000.00 1 0.680 1 1.750 1,750K 1 1.750 - - - - - - - - - - - - - - - - - - (13)(†) 23) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ (14)(†) 24) [USFFC N7] STRIKE GROUP MARITIME OPEN OCEAN RANGE (SGMOOVR) A (16)(†) 26) [USFFC N7] SURFACE LVC TRAINING A - - - 1,750K - - - - - - 9,200K 1 9.200 - - - - - - 7,886K 1 7.886 500,000.00 1 0.500 - - - 500,000.00 1 0.500 - - - 2,688K 2.688 199,000.00 1 0.199 184,000.00 1 0.184 - - - 184,000.00 1 0.184 - - - - - - - - - 900,000.00 1 0.900 - - - 900,000.00 1 0.900 - - - - - - - - - 800,000.00 1 0.800 - - - 800,000.00 1 0.800 (15)(†) 25) [USFFC N7] NCTE CYBER HARDENING A A (17)(†) 27) [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ (18)(†) 28) [USFFC N7] LVC CYBER NETWORK NATIONAL SECURITY AGENCY WHOLENESS A 1 A (19)(†) 29) [USFFC N7] LVC NETWORK LIFECYCLE MODERNIZATION A 30) FIRE ARMS TRAINING SIMULATOR (FATS) A (20)(†) 199,285.71 7 1.395 126,000.00 1 0.126 316,000.00 1 0.316 - - - - - - - - - (21)(†) Subtotal: 1) Training and Education Equipment - - 18.002 - - 2.863 - - 2.812 - - 3.616 - - - - - 3.616 27 4.462 - - - - - - - - - - - - - - - 1) YPYTD - TRAINING DELIVERY SERVICES (TDS) 1.1) ECR VDI POOL OF DESKTOPS EQUIP. UPGRADE (S2025) A 165,259.26 LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 15 of 42 P-1 Line #131 Volume 5 - 167 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Subtotal: 1) YPYTD - TRAINING DELIVERY SERVICES (TDS) - FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Training Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - 4.462 - - - - - - - - - - - - - - - 1,000.00 216 0.216 - - - - - - - - - - - - - - - 1,092.59 216 0.236 - - - - - - - - - - - - - - - - 0.031 - - - - - - - - - - - - - - - 2) Electronic Classroom (ECR) Program 2.1) ECR Instructor Podium Tech Refresh A 2.2) ECR Student Workstation Tech Refresh A 2.3) ECR Graphics Offload Server (Test Unit) A 2.4) ECR Virtual Desktop Infracture (VDI) Pool of Desktops (POD) Equipment A 2.5) ECR VDI IMPLEMENTATION (VIRTUALIZATION A SOFTWARE) 150,750.00 8 1.206 - - - - - - - - - - - - - - - 2,621.04 2,528 6.626 - - - - - - - - - - - - - - - - - 2.467 - - - - - - - - - - - - - - - 483.78 2,497 1.208 - - - - - - - - - - - - - - - 4,203.39 59 0.248 - - - - - - - - - - - - - - - 13,565.22 23 0.312 - - - - - - - - - - - - - - - 3,866.45 1,243 4.806 334 1.957 308 1.753 135 0.789 - - - 135 0.789 22,178.57 28 0.621 - - - - - - - - - - - (†) 2.6) ECR VDI/ VIRTUAL SERVER SERVICES IMPLEMENTATION A 2.7) Microsoft Office 2016 Software for ECR student seats A 2.8) TRANET CAPABILITY Upgrades for RRL - A Dell Servers - (†) 2.9) TRANET Capability Upgrades for RRL - Chassis Supervisors and A (†) Modules 2.10) NETC Classroom for Increased Accessions - Instructor Podium Equip A 5,860.00 5,690.00 5,844.44 5,844.44 (22)(†) 2.11) TRANET Capability Upgrades for RRL - McAfee 5500-D Web Secure Gateway A - - - - (†) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 16 of 42 P-1 Line #131 Volume 5 - 168 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.12) NETC Classroom for Incr. Accessions - Student A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - ($) - - FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) - ($) 8,148.54 478 3.895 - 162,500.00 10 1.625 107,500.00 1,606.01 1,099 1.765 - - - - - - 346.19 1,011 0.350 - - - - - 22,307.69 13 0.290 13 0.290 18,600.00 2,631.58 95 0.250 - - - 7,444.00 250,000.00 1 0.250 - - - 248,000.00 1 0.248 100,000.00 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - - - - - 18 3.746 - - - - - - - - - - - - - - - 25 0.465 - - - - 39 0.290 - - - - - - - 0.469 - - Total Cost Qty (Each) ($ M) - - 18 3.746 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (†) Workstations 2.13) New NETC Classrooms for Incr. Acc.- Cable Infrastructure Upgrades A 1 0.108 187,220.00 18 3.370 208,111.11 208,111.11 (23)(†) 2.14) TRANET NGEN (†) A Equip Alignment 2.15) TRANET Capability Upgrades for RRL - ISR 4000 A (†) Series Routers 2.16) TRANET Capability Upgrades - Routing/Switching A 2.17) TRANET Capability Upgrades - A 22,346.00 (24)(†) Wireless (25)(†) 2.18) TRANET Capability Upgrades Circuit Upgrades 2.19) TRANET Capability Upgrades - Base Area Network Upgrades A (†) - A 2 0.200 469,000.00 1 (26)(†) Subtotal: 2) Electronic Classroom (ECR) Program - - 26.650 - - 2.555 - - 6.347 - - 4.535 - - - - - 4.535 - - 5.400 - - - - - - - - - - - - - - - - - 5.400 - - - - - - - - - - - - - - - 1.475 - - - - - - - - - - - - - - - 1.475 - - - - - - - - - - - - - - - 3) Multi-purpose Reconfigurable Training System (MRTS) 3.1) Multi-purpose Reconfigurable Training System (MRTS) A Subtotal: 3) Multi-purpose Reconfigurable Training System (MRTS) 5) New P40A Grouping 5.1) CANES System Integration Training A Subtotal: 5) New P40A Grouping 1,475K - 1 - 6) MAA ACTIVE SHOOTER TRAINING LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 17 of 42 P-1 Line #131 Volume 5 - 169 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 6.1) MAA Active Shooter Training A MAIS Code Unit Cost ($) Qty (Each) 2,000K Subtotal: 6) MAA ACTIVE SHOOTER TRAINING - FY 2025 Total Cost ($ M) 1 - Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 2.000 - - - - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - 0.967 - - - - - - - - - 7) SIPR Data Center Consolidation (DCC) 7.1) SIPR Data Center (27)(†) A 1,836K Subtotal: 7) SIPR Data Center Consolidation (DCC) 5 9.182 948,000.00 1 0.948 967,000.00 1 - - 9.182 - - 0.948 - - 0.967 - - - - - - - - - - - 0.550 - - - - - - - - - - - - - - - - - 0.550 - - - - - - - - - - - - - - - 1.700 - - - - - - - - - 8) Mariner Skills Suite 8.1) Mariner Skills Suite Upgrade A Subtotal: 8) Mariner Skills Suite 9) Underwater Equipment 9.1) Maritime Expeditionary Standoff Response (MESR) A 810,000.00 1 0.810 - - - 1,700K 1 2,598K 2 5.195 - - - - - - - - - - - - - - - 1,263K 1 1.263 - - - - - - - - - - - - - - - 7.268 - - - - - 1.700 - - - - - - - - - 1.231 - - - - - - - - - - - - - - - 1.231 - - - - - - - - - - - - - - - 0.001 - - - - - - - - - - - - 0.001 - - - - - - - - - - - - (28)(†) 9.2) Reconfigurable Training System for AN/SLQ-32(V)6 Maintenance Trainer A 9.3) AS A-School Air Conditioning and Reconfigurable Training System A Subtotal: 9) Underwater Equipment - - 10) WWBR N95-Procures Combatant Craft Forward Looking Infrared Camera 10.1) WWBR N95Procures Combatant Craft Forward Looking A 1,231K 1 (†) Infrared Camera Subtotal: 10) WWBR N95-Procures Combatant Craft Forward Looking Infrared Camera - - 11) Tactical Training Simulator for MA A School NTTC Lackland 11.1) Tactical Training Simulator for MA A School NTTC Lackland A 616,666.67 9 5.550 1,000.00 1 (†) Subtotal: 11) Tactical Training Simulator for MA A School NTTC Lackland - - 5.550 - - 12) Enlisted Accesion Increases for STS Rating LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 18 of 42 P-1 Line #131 Volume 5 - 170 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 12.1) Enlisted Accesion Increases for STS Rating A MAIS Code Unit Cost ($) Subtotal: 12) Enlisted Accesion Increases for STS Rating FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Training Support Equipment Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 7.500 - - - - - - - - - - - - - - - - - 7.500 - - - - - - - - - - - - - - - 4.180 - - - - - - - - - - - - - - - 4.180 - - - - - - - - - - - - - - - 13) Voice Over Internet Protocol (VOIP) 13.1) Voice Over Internet Protocol (VOIP) A (†) 4,180K Subtotal: 13) Voice Over Internet Protocol (VOIP) - 1 - 14) [PACFLT] PACIFIC MULTI-DOMAIN TRAINING AND EXPERIMENTATION CAPABILITIES RANGE NAVY 14.1) [PACFLT N7] Training Support Vessels (TSV) A (29) Subtotal: 14) [PACFLT] PACIFIC MULTI-DOMAIN TRAINING AND EXPERIMENTATION CAPABILITIES RANGE NAVY - - 31.479 - - - - - - - - 235.192 - - - - - 235.192 - - 31.479 - - - - - - - - 235.192 - - - - - 235.192 - - 28.941 - - - - - - - - - - - - - - - - - 28.941 - - - - - - - - - - - - - - - - - - - - - 1,700K 1.700 - - - - - - - - - - - 0.000 - - - - 1.700 - - - - - - - - - - - - - - - 1,000K 1 1.000 - - - - - - - - - - - - - - - 1,000K 1 1.000 - - - - - - - - - - - 0.000 - - - - 2.000 - - - - - - - - - - - - - - - 1,067K 4.269 - - - - - - - - - 15) Guam Fiber Optic Cable Upgrade 15.1) [PACFLT] Guam Fiber Optic Cable Upgrade A Subtotal: 15) Guam Fiber Optic Cable Upgrade 16) CTM Career Long Learning Continuum (CLLC) 16.1) CTM Career Long Learning Continuum (CLLC) A 1 (30)(†) Subtotal: 16) CTM Career Long Learning Continuum (CLLC) - 17) Maintenance courses SLQ-32 17.1) Multipurpose reconfigurable training system A (31)(†) 17.2) Tactical simulators (32)(†) A Subtotal: 17) Maintenance courses SLQ-32 - 18) Aviation Maintenace Training Equipment 18.1) Avionics Maintenance Trainer A LI 8101 - Training and Education Equipment Navy 4 UNCLASSIFIED Page 19 of 42 P-1 Line #131 Volume 5 - 171 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] (AMT) - Development and Design ID CD MAIS Code Unit Cost ($) Qty (Each) - 19.1) Station Combat Control Training System Device A (35)(†) Subtotal: 19) OCTAMIT Station Combat Control training system device 20) CTC Navy Diver (ND) (36) 20.1) SNDL Chamber A (37)(†) 20.2) Transport Craft A 20.3) Launch & Recovery System A 20.4) Salvage Trainer A 20.5) CPP Trainer for A (38)(†) (39)(†) (40)(†) (41)(†) 20.6) Submariner Ballast Tank Trainer A 20.7) Afloat BDA/BDR A (42)(†) (43)(†) Trainer 20.8) 12K TELEHANDLER Forklift 20.9) Lightweight Hot Tap Training Kit A (45)(†) 20.10) Diver Augmented Vision Display (DAVD) A (46)(†) 20.11) Defender ROV Program of Record (47)(†) A (44)(†) System ($ M) - 19) OCTAMIT Station Combat Control training system device ATF Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (33)(†) Subtotal: 18) Aviation Maintenace Training Equipment System FY 2025 Total Cost Aggregated Items Title: Training Support Equipment A 0.000 - - - - - 4.269 - - - - - - - 10.240 - - - 1,280K 10.240 - - - - - - (34) - - - - - - - - - 1,280K - - 0.000 - - - - - - - - - - - - - - - - 2,000K 2 4.000 - - - 2,000K 2 4.000 - - - - - - - - - 450,000.00 3 1.350 - - - 450,000.00 3 1.350 - - - - - - - - - 351,000.00 2 0.702 - - - 351,000.00 2 0.702 - - - - - - - - - 4,000K 1 4.000 - - - 4,000K 1 4.000 - - - - - - - - - 1,000K 1 1.000 - - - 1,000K 1 1.000 - - - - - - - - - 1,000K 1 1.000 - - - 1,000K 1 1.000 - - - - - - - - - 3,000K 1 3.000 - - - 3,000K 1 3.000 - - - - - - - - - 300,000.00 1 0.300 - - - 300,000.00 1 0.300 - - - - - - - - - 250,000.00 2 0.500 - - - 250,000.00 2 0.500 - - - - - - - - - 100,000.00 6 0.600 - - - 100,000.00 6 0.600 - - - - - - - - - 368,000.00 8 2.944 - - - 368,000.00 8 2.944 LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 20 of 42 8 - P-1 Line #131 8 - 10.240 10.240 Volume 5 - 172 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 20.12) Handheld Sonar Shark Marine A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Training Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - 120,000.00 15 1.800 - - - 120,000.00 15 1.800 - - - - - - - - - 1,000K 1 1.000 - - - 1,000K 1 1.000 - - - - - - - - - 35,000.00 20 0.700 - - - 35,000.00 20 0.700 - - - - - - - - - 24,000.00 6 0.144 - - - 24,000.00 6 0.144 - - - - - - - - - 34,300.00 20 0.686 - - - 34,300.00 20 0.686 Subtotal: 20) CTC Navy Diver (ND) - - 0.000 - - - - - - - - 23.726 - - - - - 23.726 Total - - 398.150 - - 37.807 - - 66.663 - - 312.450 - - - - - 312.450 HHSD Navigator (48)(†) 20.13) Dry Deck (49)(†) Shelter Trainer A 20.14) Dive Propulsion Device A 20.15) JFD A (50)(†) Maintenance (51)(†) 20.16) Shadow Excursion JFD (52)(†) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) FY27 funds ($0.804M) increase due to hardware and software procured in FY26 required within the Navy Continuous Training Environment (NCTE). FY27 funds ($0.804M) increase due to hardware and software procured in FY26 required within the Navy Continuous Training Environment (NCTE). FY27 funds ($0.694M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.052M) increase due to slight increase of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.081M) increase due to slight increase in software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.226M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.527M) decrease due to even-numbered FY funding for phased replacement of Integrated Maritime Portable Acoustic Scoring and Simulation (IMPASS) system FY27 funds ($1.589M) increase due to Life Cycle Management (LCM) requirements in FY26 investments. FY27 funds ($1.864M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. (10) (11) (12) (13) (14) (15) FY27 funds ($0.695M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.150M) decrease provides for sustainment requirements for four (4) Training Support Vessels (TSVs). FY27 funds ($0.614M) increase due to slight expansion of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.198M) increase due to increase of software and hardware Life Cycle Management (LCM) requirements. FY27 funds ($0.096) decrease due to backlog dry docking intervals and regular intermediate maintenance as required by the American Bureau of Shipping (ABS). FY27 funds ($1.750M) decrease based upon level two-year procurement and installation of hardware and software requirements to enable LVC training during Advanced and Integrated Phase deployment work-ups and flexibility for enroute deployment LVC training. (16) (17) (18) (19) FY27 funds ($9.200M) decrease due to funding not programmed for FY27. FY27 funds ($7.386) decrease based on the reduction of required hardware needed for Surface Live Virtual Constructive (LVC) training program capability. FY27 funds ($0.015M) decrease due to the FY25 procurement of Live, Virtual, and Constructive (LVC) training capability requirements for Carrier Wing Five (CVW-5). FY27 funds ($0.900M) increase due new start to provide sequential updates to meet Security Agency (NSA) Raise the Bar (RTB) standards by 2031. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 21 of 42 P-1 Line #131 Volume 5 - 173 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 (20) (21) P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items Title: Training Support Equipment FY27 funds ($0.800M) increase due to new start to update outdated NCTE systems including NETTN IT, NTB applications, and Interoperability tools. FY27 funds ($0.316M) decrease provide for procurement of shore-based Firearms Training Simulators (FATS) at Center for Submarine Learning (CSL) to reduce time and energy expended for small arms proficiency by personnel assigned to small ships and submarines that lack this capability afloat. These un-tethered weapons systems and scenarios place the students into action and afford them the ability to freely maneuver and handle the weapons. (22) (23) Instructor Podium Equip: FY27 funds ($0.964) decrease due to price cost for monitors, cables, audiovisual components etc. Cable Infrastructure Upgrades: FY27 funds ($0.376M) increase supporting NETC implementing a Virtual Desktop Infrastructure (VDI) solution that largely eliminates physical workstations in classrooms. Under VDI, students utilize "zero client desktop devices" which provide user experience similar to physical workstations, without the use of CPU, local storage or Operating Systems. This transformation effort will reduce the number of fielded networking solutions via implementation of standard equipment configurations. (24) FY27 funds ($0.465M) decrease support of upgrades to CISCO ISR 4431 and ISCO Catalyst 9410 routing and switching equipment. Funding profile changes are a result of multi-phased strategy for major and different components of the training network. (25) (26) (27) FY27 funds ($0.290M) decrease due to price costs and less upgrades required to support Aruba Controllers, switches and access points for the training network. FY27 funds ($0.469M) decrease supports requirement costs for site survey and single mode fiber installation. The funding profile changes are a result of multi-phased strategy for major and different components of the training network. FY27 funds ($0.967) decrease for sustainment of data center hardware, software, and licenses for established Component Enterprise Data Centers (CEDCs) and other approved hosting locations as part of the Department of War's Information Technology efficiency for the Manpower, Training, and Education (MPT&E) Data Center footprint. The funding enables the MPT&E to implement the Navy Data Center and Commercial Cloud Resourcing Memorandum of Agreement. Funding will procure servers (encompassing both hardware and software components), ancillary equipment associated with the servers (racks, cables, switches, etc.), and integration and installation efforts as needed to meet additional hosting requirements as consolidated applications are hosted in approved hosting locations, and as a part of regular data center technical refresh. Regular technical refresh is required to maintain cyber security readiness and accreditation at the data centers. (28) FY27 funds ($1.700M) decrease for one time support of NAVIFOR efforts: ISO RRL- CTM Career Long Learning Continuum (CLLC), and NECC's effort: EOD content conversion. This also supports AIRFOR: The Avionics Maintenance Trainer (AMT) is designed to replicate current fleet avionics equipment in a lab environment, particularly for the MH-60R (MH-60R Avionics Systems Organizational Initial Maintenance Technician) systems. The trainers are intended to bridge the gap between classroom learning and hands-on experience in the fleet, enabling maintainers to operate and repair the avionics systems found on the MH-60R, such as Data, Video, and Audio Recorder Systems, Display Units for Night Vision Devices, Helmet Mounted Displays, Helmet Display Tracker, Systems, Air Navigation and Communication Systems. (29) (30) Program was eliminated as part of the FY25 OMIBUS/MILPERS ATR, then reintroduced during PB27 as an INDOPACOM priority. FY27 funds ($1.700M) decrease for one time support of NAVIFOR efforts: ISO RRL- CTM Career Long Learning Continuum (CLLC), and NECC's effort: EOD content conversion. This also supports AIRFOR: The Avionics Maintenance Trainer (AMT) is designed to replicate current fleet avionics equipment in a lab environment, particularly for the MH-60R (MH-60R Avionics Systems Organizational Initial Maintenance Technician) systems. The trainers are intended to bridge the gap between classroom learning and hands-on experience in the fleet, enabling maintainers to operate and repair the avionics systems found on the MH-60R, such as Data, Video, and Audio Recorder Systems, Display Units for Night Vision Devices, Helmet Mounted Displays, Helmet Display Tracker, Systems, Air Navigation and Communication Systems. (31) - FY27 funds ($1.000M) decrease which provided NAVIFOR a one time cost for functional requirements document support of CTT accession pathway modernization. These funds will facilitate the purchase of a Multipurpose Reconfigurable Training System maintenance and operations training. (32) FY27 funds ($1.000M) decrease which provided NAVIFOR a one time cost for functional requirements document support of CTT accession pathway modernization. These funds will facilitate the purchase of a Multipurpose Reconfigurable Training System maintenance and operations training. (33) FY27 funds ($4.269M) decrease for one time requirements stem from the need to support the development and design of the Avionics Maintenance Trainer (AMT) in alignment with the updated specifications outlined in the Functional Requirements Document (FRD). This is critical for associated risk mitigation, implementation readiness, and infrastructure alignment to ensure the AMT can be delivered and fielded on time and in accordance best practices. This includes mitigation of cost, schedule, and technical risks identified during early planning reviews, as well as necessary integration planning for initial deployment sites. FY26 funding adjustments support the development of AMT specifications, including the purchase and integration of necessary equipment for training ($2million), which will enable maintainers to meet operational and performance objectives. The AMT will allow for the following: Hands-on training with the latest avionics systems in a controlled lab environment, improved training and maintenance readiness, helping bridge the gap between theory and actual maintenance work, support for the development of new maintainers to be integrated into the fleet for completion of the first 4 units. The AMT is a critical element in developing maintainers who can operate and repair the current fleet's avionics equipment. The procurement is in line with modernization objectives and mission requirements, enabling the fleet to maintain operational readiness. Training objectives supports performance objective completion for: Advanced Data Transfer Systems, Helmet Display Tracker Systems, Air Navigation and Communication Systems. (34) CTC funding for OCTAMIT which is an eight station Combat Control training system device that provides AN/BYG-1 and AN/BQQ-10 tactical software currently employed onboard submarines. It provides operator watch-team training for apprentice/journeyman sailors for ST/FT pipelines. The funds will be used to procure and install Advanced Processor Build (APB) 21 software, updated server room and classroom hardware for the eight (8) OCTAMIT trainers at Naval Submarine School (NSS) Groton. Effort includes material procurement, hardware networking, testing, and labor costs each with a two (2) week install in Groton (35) FY27 funds ($10.240M) increase for the eight station Combat Control training system device that provides AN/BYG-1 and AN/BQQ-10 tactical software currently employed onboard submarines. It provides operator watch-team training for apprentice/journeyman sailors for ST/FT pipelines. The funds will be used to procure and install Advanced Processor Build (APB) 21 software, updated server room and classroom hardware for the eight (8) OCTAMIT trainers at Naval Submarine School (NSS) Groton. Effort includes material procurement, hardware networking, testing, and labor costs each with a two (2) week install in Groton. (36) FY27 funds ($23.726M) increase to meet operational, support, maintenance, and safety requirements. The ND requirements were approved in August 2025 to accomplish the Accession Modernization training efforts for ND. These courses will deliver technical mastery to new accession sailors to integrate Diving Teams and Commands across six different TYCOM/SYSCOMs to meet operational, support, maintenance, and safety requirements. The major pieces of equipment to purchase are: SNDI Chamber System, Salvage trainer, Afloat BDA/BDR Trainer, CPP Trainer for ATF, Submarine Ballast tank Trainer, and a Dry Dock Shelter trainer. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 22 of 42 P-1 Line #131 Volume 5 - 174 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 (37) (38) (39) P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items Title: Training Support Equipment SNDL Chamber System - This is a recompression chamber required for conducting diving operations and chamber operator training. The system is life support equipment to support diving related injuries. Transport Craft - These crafts are required for transporting NDSTC students to and from a vessel of opportunity where they will conduct modernized open ocean dive training. Launch & Recovery System - Equipment is the dive stage used for lowering and lifting the diver in and out of the water while conducting surface supplied diving operations. It is installed on both the diving vessel and the Aquatic Training Facility. (40) (41) (42) (43) Salvage Trainer - This is an essential training device that will be utilized subsurface for students to conduct salvage training operations to include patch and pipe work. It provides exposure on utilizing tools underwater. CPP Trainer for ATF - Controllable Pitch Propeller trainer is utilized for providing a training simulator to conduct rigging and removal/installation of a ships propeller blade. Submariner Ballast Tank Trainer - Simulated trainer used to acclimate a diver into enclosed space environment. This simulates entering and exiting a submarine void. Afloat BDA/BDR Trainer - This is a simulator used for conducting damage control to prevent a ship from sinking. They will conduct Battle Damage Assessment, pipe repairs, hole patching, and dewatering on a simulated Battle Damage Repair trainer. (44) (45) 12K TELEHANDLER Forklift - This is required for moving large simulated trainers, diving equipment, and diver life support systems. Lightweight Hot Tap Training Kit System - The hot tap trainer is a specialized tool used in the oil and salvage industries for removing fuel from sunken vessels. It operates by drilling a hole into the hull of the vessel and injecting heat to liquefy the fuel, allowing it to flow out more easily. This method is effective for removing pollutants from the tanks of sunken vessels and is a common practice in salvage operations. (46) Diver Augmented Vision Display (DAVD) - The Diver Augmented Vision Display (DAVD) is a complete end-to-end diver management solution incorporating critically a high-resolution see-through head-up display (HUD) embedded directly inside the diving helmet. (47) (48) (49) (50) Defender ROV Program of Record - This is an underwater remotely operated vehicle used for conducting searching and inspection operations in multiple subsea environments. Handheld Sonar Shark Marine HHSD Navigator - This is a program of record tool used as a Sonar Imaging and Navigation System for divers. It is required for students to conduct training on the system. Dry Deck Shelter Trainer - a removable module that can be attached to a submarine to allow divers easy exit and entrance while the boat is submerged. The trainer provides realistic training in a controlled environment. Dive Propulsion Device - Diver propulsion device is a battery-powered, propeller-driven underwater vehicles designed to assist divers in moving through water more efficiently. It is required for the divers to learn the system and works with the Shark Marine for conducting underwater navigation. (51) (52) JFD Maintenance - This is funding to procure replacement parts and equipment to support maintenance and initial setup for the Shadow Excursion Underwater Breathing Apparatus. Shadow Excursion JFD - is a semi-closed circuit nitrox Underwater Breathing Apparatus (UBA) that can be configured as a combined oxygen/nitrox UBA. This system will be used and maintained by the divers while conducting operations in support of Naval Special Warfare. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 23 of 42 P-1 Line #131 Volume 5 - 175 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2023 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 851,000.00 N Jan 2023 Oct 2022 2024 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 2,433K N Jan 2024 Oct 2023 2025 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 2,863K N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 2,812K N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 3,616K N Jan 2027 Oct 2026 (3) 2023 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 2,503K N Jan 2023 Oct 2022 (3) 2024 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 327,000.00 N Jan 2024 Oct 2023 (3) 2025 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 2,602K N Jan 2025 Oct 2024 (3) 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 2,595K N Jan 2026 Oct 2025 (3) 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 3,289K N Jan 2027 Oct 2026 2023 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 188,000.00 N Jan 2023 Oct 2022 2024 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 189,000.00 N Jan 2024 Oct 2023 2025 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 195,000.00 N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 194,000.00 N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 246,000.00 N Oct 2026 Oct 2026 (Each) 1) Training and Education Equipment 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) (2) 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) (2) 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) (2) 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) (2) 1) [USFFC N7] LIFE CYCLE MANAGEMENT (LCM) (2) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) 2) [USFFC N7] BALLISTIC MISSILE DEFENSE (BMD) 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA (4) 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA (4) 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA (4) 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA (4) 3) [USFFC N7] BMD FLEET SYNTHETIC TRAINING (FST) AT SEA (4) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 24 of 42 P-1 Line #131 Volume 5 - 176 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2023 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 8 290,500.00 N Jan 2023 Oct 2022 2024 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 295,000.00 N Jan 2024 Oct 2023 2025 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 302,000.00 N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 301,000.00 N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 382,000.00 N Oct 2026 Oct 2026 2023 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 811,000.00 N Jan 2023 Oct 2022 2024 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 826,000.00 N Jan 2024 Oct 2023 2025 Alion Science and Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 846,000.00 N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 844,000.00 N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 1,070K N Jan 2027 Oct 2026 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 527,000.00 N Jan 2024 Oct 2023 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 527,000.00 N Jan 2026 Oct 2025 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) 2023 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 6,083K N Jan 2023 Oct 2022 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 5,708K N Jan 2024 Oct 2023 4) [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD) (5) 4) [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD) (5) 4) [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD) (5) 4) [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD) (5) 4) [USFFC N7] ANTI-ACCESS AREA DENIAL (A2AD) (5) 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL COUNTER AIR (NIFC-CA) (6) 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL COUNTER AIR (NIFC-CA) (6) 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL COUNTER AIR (NIFC-CA) (6) 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL COUNTER AIR (NIFC-CA) (6) 7) [USFFC N7] NAVAL INTEGRATED FIRE CONTROL COUNTER AIR (NIFC-CA) (6) 8) [USFFC N7] IMPASS SCORING SYSTEM (7) 8) [USFFC N7] IMPASS SCORING SYSTEM (7) (8)(†) (8)(†) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 25 of 42 (Each) P-1 Line #131 Volume 5 - 177 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) 2025 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 5,770K N Jan 2025 Oct 2024 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 5,754K N Jan 2026 Oct 2025 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 7,343K N Jan 2027 Oct 2026 (9)(†) 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 6,554K N Jan 2024 Oct 2023 (9)(†) 2025 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 6,771K N Jan 2025 Oct 2024 (9)(†) 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 6,751K N Jan 2026 Oct 2024 (9)(†) 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 8,615K N Jan 2027 Oct 2026 2023 Alion Science & Technology / McLean, VA C / CPFF DTIC Jan 2023 Jan 2023 1 2,004K N Jan 2023 Oct 2022 2023 Alion Science & Technology / McLean, VA C / CPFF DTIC Jan 2023 Jan 2023 9,999 0.00 N Jan 2023 Oct 2022 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Jan 2024 Jan 2024 1 2,431K N Jan 2024 Oct 2023 2025 Alion Science & Technology / McLean, VA C / CPFF DTIC Jan 2025 Jan 2025 1 2,610K N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 2,604K N Jan 2026 Oct 2025 (10) 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 3,299K N Jan 2027 Oct 2026 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) 2023 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2022 Oct 2022 1 3,395K N Jan 2023 Oct 2022 2024 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2023 Oct 2023 1 3,484K N Jan 2024 Oct 2023 (8)(†) (8)(†) (8)(†) 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION (10) 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION (10) 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION (10) 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION (10) 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION (10) 11) [USFFC N7] WEST COAST NETWORK CONSOLIDATION PROCURE & SUSTAIN (11) 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & SUSTAIN (11) ✓ LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 26 of 42 (Each) P-1 Line #131 Volume 5 - 178 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & SUSTAIN (11) 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & SUSTAIN (11) 13) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) PROCURE & SUSTAIN (11) 15) [USFFC N7] NCTE SPECIAL ACCESS TRAINING NETWORK 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING (12) 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING (12) 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING (12) 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING (12) 20) [USFFC N7] NCTE CROSS DOMAIN SOLUTION FOR LVC TRAINING (12) 22) [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2 (13) 22) [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2 (13) 22) [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2 (13) 22) [USFFC N7] WEST COAST LVC NETWORK CONSOLIDATION PHASE 2 (13) O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items: Training Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 FLC, Norfolk / Norfolk, VA C / CPFF FLC, Norfolk Oct 2024 Oct 2024 1 3,562K N Jan 2025 Oct 2024 2026 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2025 Oct 2025 1 3,630K N Jan 2026 Oct 2025 2027 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2026 Oct 2026 1 3,480K N Jan 2027 Oct 2026 2023 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 316,000.00 N Jan 2023 Oct 2022 2023 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2022 Oct 2022 1 4,851K N Jan 2023 Oct 2022 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 4,862K N Jan 2024 Oct 2023 2025 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 2,703K N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 2,803K N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 3,417K N Jan 2027 Oct 2026 2024 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2023 Oct 2023 1 1,690K N Jan 2024 Oct 2023 2025 Alion Science & Technology / McLean, VA C / CPFF DTIC Oct 2024 Oct 2024 1 740,000.00 N Jan 2025 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 738,000.00 N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 936,000.00 N Oct 2026 Oct 2026 LI 8101 - Training and Education Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 27 of 42 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #131 RFP Issue Date Volume 5 - 179 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] 23) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ (14) 23) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ (14) 23) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ (14) 23) [USFFC N7 / CSG4] TRAINING SUPPORT VESSEL (TSV) MAINT BASELINE ADJ (14) 24) [USFFC N7] STRIKE GROUP MARITIME OPEN OCEAN RANGE (SGMOOVR) (15) 24) [USFFC N7] STRIKE GROUP MARITIME OPEN OCEAN RANGE (SGMOOVR) (15) 25) [USFFC N7] NCTE CYBER HARDENING (16)(†) 26) [USFFC N7] SURFACE LVC TRAINING (17)(†) 26) [USFFC N7] SURFACE LVC TRAINING (17)(†) 27) [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ (18) 27) [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ (18) 27) [USFFC N7] LVC CAPABILITY FOR CVW-5/FDNFJ (18) 28) [USFFC N7] LVC CYBER NETWORK NATIONAL SECURITY AGENCY WHOLENESS (19) 29) [USFFC N7] LVC NETWORK LIFECYCLE MODERNIZATION 30) FIRE ARMS TRAINING SIMULATOR (FATS) (21) (20) O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items: Training Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2024 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Dec 2023 Dec 2023 1 680,000.00 N Jan 2024 Oct 2023 2025 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Dec 2024 Dec 2024 1 775,000.00 N Jan 2025 Oct 2024 2026 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2025 Oct 2025 1 776,000.00 N Jan 2026 Oct 2025 2027 FLC, Norfolk / Norfolk, VA C / FFP FLC, Norfolk Oct 2026 Oct 2026 1 680,000.00 N Jan 2027 Oct 2026 2025 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2024 Oct 2024 1 1,750K N Oct 2026 Oct 2024 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 1,750K N Oct 2026 Oct 2025 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 9,200K N Jan 2026 Oct 2025 2026 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2025 Oct 2025 1 7,886K N Jan 2026 Oct 2025 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 500,000.00 N Jan 2027 2025 FLC, Norfolk / Norfolk, VA / Norfolk, VA C / CPFF DTIC Oct 2024 Oct 2024 1 2,688K N Jan 2025 Oct 2024 2026 FLC, Norfolk / Norfolk, VA / Norfolk, VA C / CPFF DTIC Oct 2025 Oct 2025 1 199,000.00 N Jan 2026 Oct 2025 2027 FLC, Norfolk / Norfolk, VA / Norfolk, VA C / CPFF DTIC Oct 2026 Oct 2026 1 184,000.00 N Jan 2027 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 900,000.00 N Jan 2027 2027 Huntington Ingalls Industries , HII / MA C / CPFF DTIC Oct 2026 Oct 2026 1 800,000.00 N Jan 2027 2023 NSWC / NSWC C / FP FLC, PHILADELPHIA Aug 2023 Aug 2023 1 189,000.00 N Dec 2024 LI 8101 - Training and Education Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 28 of 42 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) P-1 Line #131 RFP Issue Date Volume 5 - 180 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Aggregated Items: Training Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2024 NSWC / NSWC C / FP FLC, PHILADELPHIA Aug 2024 Aug 2024 1 232,000.00 N Dec 2025 2025 NSWC / NSWC C / FP FLC, PHILADELPHIA Aug 2025 Aug 2025 1 126,000.00 N Dec 2026 2026 NSWC / NSWC C / FP FLC, PHILADELPHIA Aug 2026 Aug 2026 1 316,000.00 N Dec 2027 2.5) ECR VDI IMPLEMENTATION (VIRTUALIZATION SOFTWARE) 2023 VMWARE / Palo Alto, CA C / FP NETPDTC Apr 2023 Apr 2023 5 172,000.00 N Feb 2023 2.8) TRANET CAPABILITY Upgrades for RRL - Dell Servers 2023 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETPDTC Feb 2023 Feb 2023 59 4,203.00 N May 2023 2.9) TRANET Capability Upgrades for RRL - Chassis Supervisors and Modules 2023 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETCPDC Aug 2023 Aug 2023 23 13,565.00 N Sep 2023 2023 Fluke, View Sonic , Everett Washington / Everett Washington 98206 C / FP NETPDTC Mar 2023 Mar 2023 300 3,978.40 N Jun 2023 2024 Fluke, View Sonic , Everett Washington / Everett Washington 98206 C / FP NETPDTC Mar 2024 Mar 2024 162 6,834.65 N Jun 2024 2025 Fluke, View Sonic , Everett Washington / Everett Washington 98206 C / FP NETPDTC Mar 2025 Mar 2025 334 5,860.00 N Jun 2025 2026 Fluke, View Sonic , Everett Washington / Everett Washington 98206 C / FP NETPDTC Mar 2026 Mar 2026 308 5,690.00 N Jun 2026 2.11) TRANET Capability Upgrades for RRL - McAfee 5500-D Web Secure Gateway 2023 McAfee San Jose, CA / San Jose, CA C / FP NETPDTC Mar 2023 Mar 2023 18 22,510.00 N Jun 2023 2.12) NETC Classroom for Incr. Accessions - Student Workstations 2023 Dell Computers Washington DC / C/FP C / FP NETPDTC Jun 2023 Jun 2023 60 26,068.00 N Mar 2023 2024 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NETPDC Aug 2024 Aug 2024 10 162,500.00 N Sep 2024 May 2024 2025 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NETPDC Aug 2025 Aug 2025 1 107,500.00 N Sep 2025 May 2025 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment 30) FIRE ARMS TRAINING SIMULATOR (FATS) (21) 30) FIRE ARMS TRAINING SIMULATOR (FATS) (21) 30) FIRE ARMS TRAINING SIMULATOR (FATS) (21) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) Electronic Classroom (ECR) Program 2.10) NETC Classroom for Increased Accessions - Instructor Podium Equip (22) 2.10) NETC Classroom for Increased Accessions - Instructor Podium Equip (22) 2.10) NETC Classroom for Increased Accessions - Instructor Podium Equip (22) 2.10) NETC Classroom for Increased Accessions - Instructor Podium Equip (22) 2.13) New NETC Classrooms for Incr. Acc.- Cable Infrastructure Upgrades (23) 2.13) New NETC Classrooms for Incr. Acc.- Cable Infrastructure Upgrades (23) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 29 of 42 P-1 Line #131 May 2023 Volume 5 - 181 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Method/Type or Funding Vehicle Aggregated Items: Training Support Equipment Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date May 2026 FY Contractor and Location 2026 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NETPDC Aug 2026 Aug 2026 18 187,220.00 N Sep 2025 2.14) TRANET NGEN Equip Alignment 2023 RUCKUS, Sunnyvale CA / Sunnyvale, CA C / FP NETPDC Mar 2023 Mar 2023 489 1,685.00 N Mar 2023 2.15) TRANET Capability Upgrades for RRL - ISR 4000 Series Routers 2023 CISCO San Jose CA / 3098 Olsen Drive, San Jose, CA 95128 C / FP NETPDTC Feb 2023 Feb 2023 361 378.00 N Jun 2023 2024 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETPDC Jan 2024 Jan 2024 13 22,346.00 N Jun 2024 Nov 2023 2025 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETPDC Jan 2025 Jan 2025 13 22,346.00 N Jun 2025 Nov 2024 2026 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETPDC Jan 2026 Jan 2026 25 18,600.00 N Jun 2026 Nov 2025 2024 Aruba San Jose CA / San Jose CA C / FP NETPDC Jan 2024 Jan 2024 95 2,631.58 N Jun 2024 2026 Aruba San Jose CA / San Jose CA C / FP NETPDC Sep 2026 Sep 2026 39 7,444.00 N Jan 2027 2024 DISA / P.O. Box 549 Fort Meade, MD 20755-0549 C / CPFF NETPDC Jan 2025 Jan 2025 1 250,000.00 N Mar 2025 Nov 2024 2024 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NAWTSD/NETPDC May 2024 May 2024 1 248,000.00 N Jul 2024 Feb 2024 2025 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NAWTSD/NETPDC May 2025 May 2025 2 100,000.00 N Jul 2025 Feb 2025 2026 Bowhead / 6564 Loisdale Court, Suite 900 Springfield, VA 22150 C / IDIQ NAWTSD/NETPDC May 2026 May 2026 1 469,000.00 N Jul 2027 Feb 2026 Oct 2022 Oct 2022 1 3,382K N Jan 2023 2.13) New NETC Classrooms for Incr. Acc.- Cable Infrastructure Upgrades (23) 2.16) TRANET Capability Upgrades - Routing/Switching (24) 2.16) TRANET Capability Upgrades - Routing/Switching (24) 2.16) TRANET Capability Upgrades - Routing/Switching (24) 2.17) TRANET Capability Upgrades - Wireless (25) 2.17) TRANET Capability Upgrades - Wireless (25) 2.18) TRANET Capability Upgrades - Circuit Upgrades 2.19) TRANET Capability Upgrades - Base Area Network Upgrades (26) 2.19) TRANET Capability Upgrades - Base Area Network Upgrades (26) 2.19) TRANET Capability Upgrades - Base Area Network Upgrades (26) (Each) 7) SIPR Data Center Consolidation (DCC) 7.1) SIPR Data Center (27) 2023 NIWC / Charleston, SC C / FP North Charleston, SC 7.1) SIPR Data Center (27) 2024 NIWC / Charleston, SC C / FP North Charleston, SC Oct 2023 Oct 2023 1 1,610K N Jan 2024 7.1) SIPR Data Center (27) 2025 NIWC / Charleston, SC C / FP North Charleston, SC Dec 2024 Dec 2024 1 948,000.00 N Jan 2025 7.1) SIPR Data Center (27) 2026 NIWC / Charleston, SC C / FP North Charleston, SC Dec 2025 Dec 2025 1 967,000.00 N Jan 2026 2026 ProActive Technologies / Oviedo, FL C / FP Norfolk, VA. Sep 2026 Sep 2026 1 1,700K N Jan 2027 9) Underwater Equipment 9.1) Maritime Expeditionary Standoff Response (MESR) (28) Mar 2026 10) WWBR N95-Procures Combatant Craft Forward Looking Infrared Camera LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 30 of 42 P-1 Line #131 Volume 5 - 182 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] O O C 10.1) WWBR N95-Procures Combatant Craft Forward Looking Infrared Camera P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items: Training Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2023 TRIJICON, INC / Wixom, MI C / FFP USMC Sep 2023 Sep 2023 1 1,231K N Feb 2024 Qty (Each) RFP Issue Date Jul 2023 11) Tactical Training Simulator for MA A School NTTC Lackland 11.1) Tactical Training Simulator for MA A School NTTC Lackland 2023 ADSYNC/NTTC / Lackland C / FFP JBSA Lackland, TX Mar 2023 Mar 2023 7 507,000.00 N Apr 2023 11.1) Tactical Training Simulator for MA A School NTTC Lackland 2024 ADSYNC/NTTC / Lackland C / FFP JBSO Lackland, TX Mar 2024 Mar 2024 1 1,000.00 N Jun 2024 11.1) Tactical Training Simulator for MA A School NTTC Lackland 2025 ADSYNC/NTTC / Lackland C / FP JBSO Lackland, TX Mar 2025 Mar 2025 1 1,000.00 N Jun 2025 2024 CISCO / 3098 Olsen Drive, San Jose, CA 95128 C / FFP NETPDTC May 2024 May 2024 1 4,180K N Jul 2024 2026 FLC, Norfolk / Norfolk, VA C / FP Norfolk, VA. Sep 2026 Sep 2026 1 1,700K N Jan 2027 Mar 2026 2026 FLC, Norfolk / Norfolk, VA C / FP Norfolk, VA. Sep 2026 Sep 2026 1 1,000K N Jan 2027 Mar 2026 2026 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2026 Sep 2026 1 1,000K N Jan 2027 Mar 2026 2026 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2026 Sep 2026 4 1,067K N Jan 2027 Mar 2026 13) Voice Over Internet Protocol (VOIP) 13.1) Voice Over Internet Protocol (VOIP) 16) CTM Career Long Learning Continuum (CLLC) 16.1) CTM Career Long Learning Continuum (CLLC) (30) 17) Maintenance courses SLQ-32 17.1) Multipurpose reconfigurable training system (31) 17.2) Tactical simulators (32) 18) Aviation Maintenace Training Equipment 18.1) Avionics Maintenance Trainer (AMT) - Development and Design (33) 19) OCTAMIT Station Combat Control training system device 19.1) Station Combat Control Training System Device (35)(†) 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 8 1,280K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 2 2,000K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 3 450,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 2 351,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 4,000K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 1,000K N Jan 2028 Mar 2027 20) CTC Navy Diver (ND) 20.1) SNDL Chamber System 20.2) Transport Craft (37) (38) 20.3) Launch & Recovery System (39) 20.4) Salvage Trainer (40) 20.5) CPP Trainer for ATF (41) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 31 of 42 P-1 Line #131 Volume 5 - 183 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Item Number / Title [DODIC] 20.6) Submariner Ballast Tank Trainer (42) 20.7) Afloat BDA/BDR Trainer (43) 20.8) 12K TELEHANDLER Forklift (44) 20.9) Lightweight Hot Tap Training Kit System (45) 20.10) Diver Augmented Vision Display (DAVD) (46) 20.11) Defender ROV Program of Record (47) 20.12) Handheld Sonar Shark Marine HHSD Navigator (48) 20.13) Dry Deck Shelter Trainer 20.14) Dive Propulsion Device 20.15) JFD Maintenance (51) 20.16) Shadow Excursion JFD (†) (49) (50) (52) O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Aggregated Items: Training Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 1,000K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 3,000K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 300,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 2 250,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 6 100,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 8 368,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 15 120,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 1 1,000K N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 20 35,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 6 24,000.00 N Jan 2028 Mar 2027 2027 FLC, Norfolk / Norfolk, VA C / FP Naval Station Norfolk Sep 2027 Sep 2027 20 34,300.00 N Jan 2028 Mar 2027 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 32 of 42 P-1 Line #131 Volume 5 - 184 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Training Support Equipment Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Training and Education Equipment 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) (8) Prior Years Deliveries: 2 1 2023 NAVY 1 0 1 1 2024 NAVY 1 0 1 A1 0 1 2025 NAVY 1 0 1 1 2 2026 NAVY 1 0 1 1 2 2027 NAVY 1 0 1 A1 0 1 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION (9) Prior Years Deliveries: 5 3 2024 NAVY 1 0 1 3 2025 NAVY 1 0 1 1 4 2026 NAVY 1 0 1 1 4 2027 NAVY 1 0 1 1 1 1 25) [USFFC N7] NCTE CYBER HARDENING 5 2026 NAVY 1 0 (16) 0 26) [USFFC N7] SURFACE LVC TRAINING A1 (17) 6 2026 NAVY 1 0 1 1 6 2027 NAVY 1 0 1 1 19) OCTAMIT Station Combat Control training system device 19.1) Station Combat Control Training System Device 7 2027 NAVY 8 0 (35) 8 8 O C T N O V LI 8101 - Training and Education Equipment Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #131 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 185 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Training Support Equipment Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Training and Education Equipment 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) (8) Prior Years Deliveries: 2 1 2023 NAVY 1 1 0 1 2024 NAVY 1 1 0 1 2025 NAVY 1 0 1 2 2026 NAVY 1 0 1 2 2027 NAVY 1 0 1 0 0 A1 0 A1 0 1 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION (9) Prior Years Deliveries: 5 3 2024 NAVY 1 1 0 3 2025 NAVY 1 0 1 4 2026 NAVY 1 0 1 4 2027 NAVY 1 0 1 25) [USFFC N7] NCTE CYBER HARDENING 5 2026 NAVY 1 0 A1 0 1 (16) 0 26) [USFFC N7] SURFACE LVC TRAINING 0 A1 1 A1 0 A1 0 (17) 6 2026 NAVY 1 0 1 6 2027 NAVY 1 0 1 1 19) OCTAMIT Station Combat Control training system device 19.1) Station Combat Control Training System Device 7 2027 NAVY 8 0 (35) 8 8 O C T N O V LI 8101 - Training and Education Equipment Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 42 S E P O C T N O V D E C J A N F E B P-1 Line #131 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 186 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Training Support Equipment Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Training and Education Equipment 9) [USFFC N7] LVC ISO FLEET TRAINING WHOLENESS (FTW) (8) Prior Years Deliveries: 2 1 2023 NAVY 1 1 0 0 1 2024 NAVY 1 1 0 0 1 2025 NAVY 1 1 0 0 2 2026 NAVY 1 1 0 2 2027 NAVY 1 0 1 0 A1 10) [USFFC N7] EAST COAST NETWORK CONSOLIDATION 0 (9) Prior Years Deliveries: 5 3 2024 NAVY 1 1 0 0 3 2025 NAVY 1 1 0 0 4 2026 NAVY 1 1 0 4 2027 NAVY 1 0 1 25) [USFFC N7] NCTE CYBER HARDENING 5 2026 NAVY 1 0 (16) 1 26) [USFFC N7] SURFACE LVC TRAINING 0 A1 0 0 (17) 6 2026 NAVY 1 1 0 6 2027 NAVY 1 0 1 0 A1 0 19) OCTAMIT Station Combat Control training system device 19.1) Station Combat Control Training System Device 7 2027 NAVY 8 0 (35) 8 A8 O C T N O V LI 8101 - Training and Education Equipment Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 35 of 42 S E P 0 O C T N O V D E C J A N F E B P-1 Line #131 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 187 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 P-1 Line Item Number / Title: 8101 / Training and Education Equipment Production Rates (Each / Year) MFR Ref # Aggregated Items: Training Support Equipment Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Alion Science & Technology McLean, VA TBD 2 Huntington Ingalls Industries , HII - MA TBD 3 Alion Science & Technology McLean, VA TBD 4 Huntington Ingalls Industries , HII - MA TBD 5 Huntington Ingalls Industries , HII - MA TBD 6 Huntington Ingalls Industries , HII - MA TBD 7 FLC, Norfolk - Norfolk, VA TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 36 of 42 P-1 Line #131 Volume 5 - 188 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Education Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 2) U.S. Naval Academy (USNA) 2.1) Backup System Replacement A 2.2) Advanced Computing Cluster Replacement A 2.3) High Speed Wind Tunnel Pipeing A Replacement (†) 2.4) Chromatography Replacement (†) A 2.5) Microfabrication Facility A 2.7) Telephony and Voice Switch S/W Upgrade (IP Telephony) A 2.8) Auditorium Sound System Replacement A 2.9) Mission System Host Platform A 2.10) Microscale Thermal Transport Replacement A 2.11) Enterprise (†) A Network Upgrades 2.12) Particle Image (†) A Velocimeter 2.13) 12m Satellite (†) A Dish 2.14) Universal Wireless Telecommunications System - - 329,000.00 - 1 - 0.374 - - - - - - - - - - - - - - - 0.329 - - - - - - - - - - - - - - - 0.768 - - - - - - - - - - - - - 768,000.00 1 297,000.00 1 0.297 - - - - - - - - - - - - - - - 335,000.00 1 0.335 - - - - - - - - - - - - - - - 877,000.00 1 0.877 - - - - - - - - - - - - - - - 256,000.00 1 0.256 - - - - - - - - - - - - - - - 692,000.00 1 0.692 - - - - - - - - - - - - - - - 313,000.00 1 0.313 - - - - - - - - - - - - - - - 455,333.33 6 2.732 - - - - - - - - - - - - - - - 521,000.00 1 0.521 - - - - - - - - - - - - - - - 280,500.00 2 0.561 1,000K 1 1.000 - - - - - - - - - - - - 308,000.00 4 1.232 500,000.00 1 0.500 - - - - - - - - - - - - 299,000.00 1 0.299 - - - - - - - - - - - - - - - 264,500.00 2 0.529 - - - - - - - - - - - - - - - 308,000.00 1 0.308 - - - - - - - - - - - - - - - 305,000.00 1 0.305 - - - - - - - - - - - - - - - 378,000.00 1 0.378 - - - - - - - - - - - - - - - 273,000.00 1 0.273 - - - - - - - - - - - - - - - A (†) 2.15) MALDI-TOF Mass Spectrometry A 2.16) Software Asset Management (SAM) A 2.17) Load Balancers A 2.18) Enclave Redesign A 2.19) Enterprise SAN: A 2.20) Sodick Wire EDM Machine A LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 37 of 42 P-1 Line #131 Volume 5 - 189 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.21) WITS 3 Network Extension A 2.22) Food Service Equipment A 2.23) Satellite Validation Testing System A 2.24) 380 FT Towing Tank Carriage Control A System Upgrade (†) 2.27) Hydro Data Acquisition Equipment Upgrade (53)(†) 2.28) Diffractometer X-Ray A (†) 2.29) Core Network Devices LCM - A A (†) CISCO 2.30) Distro Network Devices LCM (Yard & Bancroft) A (†) 2.31) Aruba Wireless (†) A Infrastructure 2.32) 380 FT Towing Tank Wavemaker Replacement 2.33) Chapel Sound System (†) 2.34) LAN Room Video Surveillance and Security A (†) A A (†) 2.35) Nuclear Magnetic Resonance (NMR) MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Education Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 872,000.00 1 0.872 - - - - - - - - - - - - - - - 278,000.00 1 0.278 - - - - - - - - - - - - - - - - - - 0.600 - - - - - - - - - - - - - - - - - - 0.550 - - - - - - - - - - - - - 250,000.00 1 600,000.00 1 0.250 - - - - - - - - 550,000.00 1 550,000.00 1 0.550 295,000.00 1 0.295 - - - - - - - - - - - - - - - 320,000.00 1 0.320 - - - - - - - - - - - - - - - 500,000.00 1 0.500 - - - - - - - - - - - - - - - 548,000.00 1 0.548 800,000.00 1 0.800 - - - - - - - - - - - - - - - 1,000K 1 1.000 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - - - - 350,000.00 1 0.350 - - - - - - - - - - - - - - - 500,000.00 1 0.500 - - - - - - - - - - - - - - - 500,000.00 1 0.500 - - - - - - - - - A (†) Spectrometer 2.36) SAN Pure (†) A Storage 2.37) Metallography lab suite (†) 2.38) Autoclave 2.39) Electromechanical test equipment data (†) A A A LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 38 of 42 P-1 Line #131 Volume 5 - 190 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] acquisition and control system ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Education Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) 2.40) Aruba NAC (†) A Wireless Expansion 2.41) Aruba A (†) Switches 2.42) Atomic Force Microscope System (†) 2.43) Bancroft QOL A A (†) Wireless Internet 2.44) Bridge Simulator (†) A Upgrades 2.45) Confocal Microscope System (†) 2.46) F5 Load A A (†) Balancers 2.47) MALDI TOF Mass Spectrometer (†) 2.48) Polarimetric Phase Array Weather A A (†) Radar 2.49) IVER Ecomapper with A (†) Inertial Navigation 2.50) Optical microscope and imaging software A (†) 2.51) Hover Test Stand Rotor Hub A 2.53) CAC Reader A (54)(†) System (55)(†) (56)(†) A 2.55) Telephone Switch Infrastructure A 2.56) Wireless Measurement Lab A 2.54) Firewalls (57)(†) (58)(†) Subtotal: 2) U.S. Naval Academy (USNA) - - - - - - 419,000.00 1 0.419 - - - - - - - - - - - - - - - 1,275K 1 1.275 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - 368,000.00 1 0.368 - - - - - - - - - - - - - - - 348,000.00 1 0.348 - - - - - - - - - - - - - - - 600,000.00 1 0.600 - - - - - - - - - - - - - - - 308,000.00 1 0.308 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - 450,000.00 1 0.450 - - - - - - - - - - - - - - - 500,000.00 1 0.500 - - - - - - - - - - - - - - - 250,000.00 1 0.250 - - - - - - - - - - - - - - - - - - 654,000.00 1 0.654 - - - 654,000.00 1 0.654 - - - - - - - - - 300,000.00 1 0.300 - - - 300,000.00 1 0.300 - - - - - - - - - 400,000.00 1 0.400 - - - 400,000.00 1 0.400 - - - - - - - - - 362,000.00 1 0.362 - - - 362,000.00 1 0.362 - - - - - - - - - 300,000.00 1 0.300 - - - 300,000.00 1 0.300 - - 13.424 - - 5.318 - - 6.968 2.566 - - - LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 39 of 42 - - P-1 Line #131 - - 2.566 Volume 5 - 191 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8101 / Training and Education Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Education Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 3) Sustain Hopper Hall Technology 3.1) B. Underwater Motion Capture System for Hopper Hall SURF A 3.2) C. Above water motion capture system for Hopper Hall SURF A 3.3) D. Above Water Motion Capture System for HOPPER Hall AerTemIS A 3.4) E. Anechoic Chamber System HOPPER HALL A Subtotal: 3) Sustain Hopper Hall Technology 428,000.00 1 0.428 - - - - - - - - - - - - - - - 434,000.00 1 0.434 - - - - - - - - - - - - - - - 382,000.00 1 0.382 - - - - - - - - - - - - - - - 256,000.00 1 0.256 - - - - - - - - - - - - - - - - - - - - - - - - 20 16.000 - - - 20 16.000 - - 1.500 - - - - - - - - - - - - - - - Subtotal: 4) USNA Sailboat Recapitalizaton - - 0.000 - - - - - - - - 16.000 - - - - - 16.000 Total - - 14.924 - - 5.318 - - 6.968 - - 18.566 - - - - - 18.566 4) USNA Sailboat Recapitalizaton 4.1) USNA Sailboat Recapitalization (59)(†) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 800,000.00 800,000.00 indicates the presence of a P-5a Footnotes: (53) (54) FY27 funds ($0.550M) increase to replace and update obsolete data acquisition equipment for the FY27 funds ($0.654M) increase the Hover Test Stand Rotor Hub, life cycle replacement of the motor, rotor force balancer, articulated rotor hub and set of composite rotor blades used for instruction of Aerodynamics, Fluids and Propulsion. (55) (56) FY27 funds ($0.300M) increase replace Common Access Card Reader System for Bancroft Hall. FY27 funds ($0.400M) increase the acquisition will replace old equipment on the USNA Enterprise Enclave that are reaching end of serviceable life. The replacement devices will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. (57) FY27 funds ($0.362M) increase the acquisition will replace old telecommunication equipment on the USNA Enterprise Enclave that are reaching end of serviceable life. The replacement devices will facilitate faster and more reliable mission critical enterprise services using up to date and supportable technologies. (58) FY27 funds ($0.300M) increase the wireless measurements system is used to characterize the interaction of wireless signals with the physical environment, enabling Faculty and Midshipmen research as well as providing state-of-the-art classroom instruction. The new system will enable us to expand our capabilities to characterize new frequency bands of interest for 6G communications as well as current and future Navy operations. (59) FY27 funds ($16.000M) increase replace aging fleet of sailboats in support of USNA midshipmen training in the maritime environment. LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 40 of 42 P-1 Line #131 Volume 5 - 192 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Aggregated Items: Education Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2.3) High Speed Wind Tunnel Pipeing Replacement 2025 FLC, Norfolk / Norfolk, VA C / FP FLC, Norfolk Sep 2025 Sep 2025 1 768,000.00 N Jan 2026 Jun 2025 2.4) Chromatography Replacement 2023 DLA / Philadelphia, PA C / FP FLC, Norfolk Jun 2023 Jun 2023 1 297,000.00 N Aug 2023 Feb 2023 2023 Paragon Micro Inc., Buffalo Grove IL / Buffalo Grove, IL C / FP FLC, Norfolk Sep 2023 Sep 2023 1 719,000.00 N Mar 2023 2023 Unknown / FLC, Norfolk C / FP FLC, Norfolk Jun 2023 Jun 2023 1 521,000.00 N Dec 2023 Dec 2022 2023 Morehead Space Technologies, Olive Hill KY / Olive Hill KY C / FP FLC, Norfolk Apr 2023 Apr 2023 1 261,000.00 N Oct 2023 Oct 2022 2025 Morehead Space Technologies, Olive Hill KY / Olive Hill KY C / FP FLC, Norfolk May 2025 May 2025 1 1,000K N Aug 2025 Nov 2024 2.14) Universal Wireless Telecommunications System 2023 GSA, Washington DC / Washington DC C / FP FLC, Norfolk Feb 2023 Feb 2023 1 359,000.00 N Aug 2022 2.14) Universal Wireless Telecommunications System 2024 GSA, Washington DC / Washington DC C / FP FLC, Norfolk Jun 2024 Jun 2024 1 682,000.00 N Sep 2024 Jun 2024 2.14) Universal Wireless Telecommunications System 2025 GSA, Washington DC / Washington DC C / FP FLC, Norfolk May 2025 May 2025 1 500,000.00 N Aug 2025 Nov 2024 2.24) 380 FT Towing Tank Carriage Control System Upgrade 2025 FLC, Norfolk / Norfolk, VA C / FP FLC, Norfolk Dec 2025 Dec 2025 1 250,000.00 N Mar 2027 May 2025 2027 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jun 2027 Jun 2027 1 550,000.00 N Feb 2027 2024 RIGAKU AMERICAS CORPORATION, Woodland TX / Woodland, TX C / FP FLC, Norfolk Mar 2024 Mar 2024 1 295,000.00 N Apr 2024 Oct 2023 2.29) Core Network Devices LCM CISCO 2024 FCN Inc, / Rockville MD C / FP FLC, Norfolk Mar 2024 Mar 2024 1 320,000.00 N Apr 2024 Oct 2023 2.30) Distro Network Devices LCM (Yard & Bancroft) 2024 FCN Inc / Rockville, MD C / FP FLC, Norfolk Apr 2024 Apr 2024 1 500,000.00 N Jul 2024 Nov 2023 2024 PARAGON MICR O INC / Buffalo Grove IL C / FP FLC, Norfolk Feb 2024 Feb 2024 1 548,000.00 N May 2024 Oct 2023 2025 PARAGON MICR O INC / Buffalo Grove IL C / FP FLC, Norfolk Mar 2025 Mar 2025 1 800,000.00 N Jul 2025 Oct 2024 2.32) 380 FT Towing Tank Wavemaker Replacement 2025 FLC, Norfolk / Norfolk, VA C / FP FLC, Norfolk Jan 2026 Jan 2026 1 1,000K N Mar 2026 Jun 2025 2.33) Chapel Sound System Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) U.S. Naval Academy (USNA) 2.11) Enterprise Network Upgrades 2.12) Particle Image Velocimeter 2.13) 12m Satellite Dish 2.13) 12m Satellite Dish 2.27) Hydro Data Acquisition Equipment Upgrade (53) 2.28) Diffractometer X-Ray 2.31) Aruba Wireless Infrastructure 2.31) Aruba Wireless Infrastructure 2025 FLC, Norfolk / Norfolk, VA C / FP FLC, Norfolk Jan 2026 Jan 2026 1 250,000.00 N Mar 2026 Jun 2025 2.34) LAN Room Video Surveillance and Security 2025 INSIGHT PUBLIC SECTOR, INC. / Chandler, AZ C / FP FLC, Norfolk Jun 2025 Jun 2025 1 250,000.00 N Sep 2025 Dec 2024 2.35) Nuclear Magnetic Resonance (NMR) Spectrometer 2025 Q ONE AMERICAS, INC. / Fitchburg, MA C / FP FLC, Norfolk Jun 2025 Jun 2025 1 250,000.00 N Nov 2025 Jan 2025 2.36) SAN Pure Storage 2025 FLC, Norfolk / Norfolk, VA C / FP FLC, Norfolk Dec 2025 Dec 2025 1 250,000.00 N Mar 2026 May 2025 LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 41 of 42 P-1 Line #131 Volume 5 - 193 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 1 Aggregated Items: Education Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2.37) Metallography lab suite 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Feb 2026 Feb 2026 1 350,000.00 N Aug 2026 Oct 2025 2.38) Autoclave 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Feb 2026 Feb 2026 1 500,000.00 N Sep 2026 Oct 2025 2.39) Electro-mechanical test equipment data acquisition and control system 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Mar 2026 Mar 2026 1 500,000.00 N Sep 2026 Oct 2025 2.40) Aruba NAC Wireless Expansion 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Mar 2026 Mar 2026 1 419,000.00 N May 2026 Oct 2025 2.41) Aruba Switches 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Mar 2026 Mar 2026 1 1,275K N Jun 2026 Oct 2025 2.42) Atomic Force Microscope System 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk May 2026 May 2026 1 250,000.00 N Sep 2026 Nov 2025 2.43) Bancroft QOL Wireless Internet 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jun 2026 Jun 2026 1 368,000.00 N Oct 2026 Dec 2025 2.44) Bridge Simulator Upgrades 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jul 2026 Jul 2026 1 348,000.00 N Nov 2026 Jan 2026 2.45) Confocal Microscope System 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jul 2026 Jul 2026 1 600,000.00 N Dec 2026 Jan 2026 2.46) F5 Load Balancers 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jun 2026 Jun 2026 1 308,000.00 N Oct 2026 Dec 2025 2.47) MALDI TOF Mass Spectrometer 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jun 2026 Jun 2026 1 250,000.00 N Sep 2026 Dec 2025 2.48) Polarimetric Phase Array Weather Radar 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jul 2026 Jul 2026 1 450,000.00 N Oct 2026 Jan 2026 2.49) IVER Ecomapper with Inertial Navigation 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Jul 2026 Jul 2026 1 500,000.00 N Dec 2026 Jan 2026 2.50) Optical microscope and imaging software 2026 FLC, Norfolk / Norfolk, VA C / FP FLC Norfolk Aug 2026 Aug 2026 1 250,000.00 N Dec 2026 Feb 2026 2027 TBD/FLC Norfolk / FLC, Norfolk C / FP Norfolk, VA. Jan 2027 Jan 2027 1 654,000.00 N Oct 2026 2027 TBD/FLC Norfolk / FLC, Norfolk C / FP Norfolk, VA. Mar 2027 Mar 2027 1 300,000.00 N Nov 2026 2027 TBD/FLC Norfolk / FLC Norfolk C / FP Norfolk, VA. Mar 2027 Mar 2027 1 400,000.00 N Nov 2026 2027 TBD/FLC Norfolk / FLC Norfolk C / FP Norfolk, VA. Mar 2027 Mar 2027 1 362,000.00 N Nov 2026 2027 TBD/FLC Norfolk / FLC Norfolk C / FP Norfolk, VA. May 2027 May 2027 1 300,000.00 N Dec 2026 2027 TBD/FLC Norfolk / FLC, Norfolk C / FP FLC Norfolk Sep 2027 Sep 2027 20 800,000.00 N Item Number / Title [DODIC] 2.51) Hover Test Stand Rotor Hub (54) 2.53) CAC Reader System 2.54) Firewalls (55) (56) 2.55) Telephone Switch Infrastructure (57) 2.56) Wireless Measurement Lab (58) O O C P-1 Line Item Number / Title: 8101 / Training and Education Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4) USNA Sailboat Recapitalizaton 4.1) USNA Sailboat Recapitalization (59) LI 8101 - Training and Education Equipment Navy UNCLASSIFIED Page 42 of 42 P-1 Line #131 Volume 5 - 194 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8106 / Command Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 517.564 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 517.564 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 517.564 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 29.698 34.249 55.202 0.000 55.202 35.182 35.456 36.471 - - - - - - - - 29.698 34.249 55.202 0.000 55.202 35.182 35.456 36.471 - - - - - - - - 29.698 34.249 55.202 0.000 55.202 35.182 35.456 36.471 To FY 2031 Complete 37.351 Continuing - Continuing - 37.351 Continuing - Total - Continuing - - 37.351 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Naval Criminal Investigative Service (NCIS) mission supports day-to-day operations to Prevent Terrorism, Protect National Secrets, Reduce Crime across the Department of the Navy (DON) and comply with DON Mandates. NCIS IT Programs and Technical Support are essential to fulfill its mission. Electronic Military Personnel Record System (EMPRS) is an electronic document/image based system that serves as the official repository for all Department of Navy (DON) official military personnel record images (over 170 million images). It supports active, reserve and retired/separated military personnel in the functional areas of selection board operations, casualty management, mobilization, veteran benefits (providing automated Sailor information to the Veterans Administration) and other military personnel management functions. EMPRS annually supports over 150 statutory and administrative selection boards, providing over 12 million service record images, covering promotions, assignments, and retention. PDAS Equipment Modernization: Planning and Decision Aid System (PDAS) is a classified, protected program operated by the Navy. PDAS is a command-and-control system that provides capabilities to Office of the Secretary of War, services, Unified Combatant Commanders (CCMD), Intelligence Community and Coalition partners for operational planning/coordination of special access programs (SAPs). PDAS enables Integrated Joint Special Technical operations (IJSTO) to incorporate SAPs into operational planning and execution from battlefield operators through the Commander-in-Chief in support of national security objectives. PDAS is the system for the Chairman of the Joint Chiefs of Staff (CJCS) for IJSTO. Maritime Operational Battlespace Command & Control (MOB C2) (formerly MOC) program of record supports Maritime Operation Centers by providing enhanced operational capabilities through delivery of Missile Defense applications through MOC Workstations (MWS). This includes hardware tech refresh, integration, testing, and installations that enable MOCs to effectively monitor the battlespace, Link-16 tracks, and maintain space situation awareness. MOB C2 also provides Joint Integrated Voice-Video Enterprise Systems (JIVES), formerly Naval Video Services (NVS), which provides a standardized enterprise solution with a common baseline across all MOCs, adhering to MOC Core Baseline/Mission Build (CB/MB) requirements. MOB C2 is leading the Commander 7th Fleet (C7F) Move Ashore effort as well. This will guarantee the Fleet's continued full operational capacity for USS Blue Ridge dry-docking by establishing a secure and effective command and control shore location. MOB C2 also supports the "Fight From the MOC" initiative by tracking critical systems required for full Fleet interoperability. This initiative focuses on priority sites, including Commander Pacific Fleet (CPF), Commander 3rd Fleet (C3F), Commander 7th Fleet (C7F), and Commander 10th Fleet (C10F) by leveraging complex C4I systems to provide standardized interoperability. This program is crucial for maintaining missile defense readiness and INDOPACOM operational command and control capabilities, ensuring Fleet commanders can effectively coordinate defensive operations and maintain vital situational awareness across the Pacific theater's complex threat environment. Additionally, MOB C2 provides deployable Distributed Command, Control & Communications to provide real-time situational awareness and decision support across all domains. LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 1 of 20 P-1 Line #132 Volume 5 - 195 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8106 / Command Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Command Support Equipment support force protection and physical security requirements and Logistics Service Area (LSA) infrastructure in Naval Forces Europe-Africa Somalia Persistent Presence. Funding is to provide physical security measures at multiple locations in the Naval Forces Europe - Africa AOR to minimize West African campaign challenges for U.S. Forces in Somalia. Funds for physical security measures within the Naval Forces Europe - Africa AOR. Lifecycle operations of mission critical FRCS (inventory, operations, sustainment, cyber readiness, risk management, and manning requirements) at priority installations. Control systems support operational capabilities for Defense navigation, logistics, resupply, and refueling, purchasing replacement and upgrade of various types of equipment, to include, but not limited to, critical cable plant repair / upgrade, Voice, Video, and Data Infrastructure and security disintegrators / systems at world-wide Base Communications Office (BCO) sites throughout the Pacific and Atlantic areas of responsibility. This equipment is an integral part of the programs to improve the fleet and shore establishment by maintaining or expanding existing capabilities or replacing ineffective units. Procurement of Systematic replacement for new investment items required in support of the Navy's operational mission. NAVIFOR Shore Modernization provides Command Support Equipment procurements and installations for Information Warfare (IW) Military Construction (MILCON) projects and ensures a holistic platform configuration control, maintenance, sustain and modernization model is carried out for Naval Computer and Telecommunications Platforms (NCTP) Command, Control and Communications (C3) Shore Commands that is critical to Navy IW Distributed Maritime Operations (DMO). NCTP C3 Shore Commands include Navy Computer & Telecommunications Area Mater Stations (NCTAMS), Navy Computer & Telecommunications Stations (NCTS) and Maritime Operations Centers (MOCs). USEUCOM prioritizes critical procurement, installation, testing, and accreditation for a multi-lateral information sharing capability supporting multiple intelligence collection programs and partners. LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 2 of 20 P-1 Line #132 Volume 5 - 196 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8106 / Command Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Command Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 517.564 - / 29.698 - / 34.249 - / 55.202 - / 517.564 - / 29.698 - / 34.249 - / 55.202 - / - - / 55.202 / 0.000 - / 55.202 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 1.1 Naval Criminal Investigative Services (NCIS) Data Modernization & Analytical Tools: FY27 increase ($2.865M) supports refresh of the IT Lifecycle of the Navy Law Enforcement hosting platform systems used to host Law Enforcement Sensitive (LES) and Criminal Justice Information System (CJIS) services for the Navy and support collaboration and interoperation with other Law Enforcement partners to include Department of Justice (DOJ), Department of Homeland Security (DHS), Department of State (State), Military Criminal Investigative Organizations (MCIO), and local/state/tribal Law Enforcement entities. 5.3 Network Drives: FY27 decrease ($0.091M) is due to sustainment of the EMPRS program, providing technology refreshment (TR) throughout the years (evolutionary) as opposed to a TR every eight years. 5.4 Storage Devices: FY27 increase ($0.115M) is due to the reduced quantity of storage devices for Network Devices in association with Electronic Military Personnel Records System (EMPRS) required. Funds provided for life cycle replacement of storage devices. 5.5 Workstations (Selection (SEL) Board): FY27 increase ($0.069M) is due to reduced requirement for additional workstations in association with workstations for the Selection Board with Electronic Military Personnel Records System (EMPRS). 5.6 Scanners High Speed: FY27 decrease ($0.112M) is provided for High-Speed Scanners in association with EMPRS. Electronic Military Personnel Records System (EMPRS) is an electronic document/imagebased system that serves as the repository for all Department of the Navy official military personnel record images. Funds provide for life cycle replacement of network devices. 5.7 Peripherals: FY27 decrease ($0.015M) is due to lower peripherals required. Peripherals include items such as removable walls within boardrooms that function as display screen for military personnel record display, keyboards, printers, monitors, mice for workstations in the boardrooms, etc. Peripherals represent auxiliary and infrastructure components that make up and are associated with the EMPRS system. EMPRS is the major information system which is mutually supported by infrastructure to conduct 160 selection boards on an annual basis. 5.11 Records Mgmt. Software: FY27 increase ($0.008M) provided for procurement of software in support of the Electronic Military Personnel Records System (EMPRS). Electronic Military Personnel Records System (EMPRS) is an electronic document/image-based system that serves as the repository for all Department of the Navy official military personnel record images. Funds provide for life cycle replacement of network devices. 5.13 Data Center Consolidation (DCC): FY27 decrease ($1.644M) supports the consolidation and application migration efforts and ensures that systems are modernized to sustain security requirements. Funding supports the consolidation and application migration efforts and systems modernization. Funds provided sustainment of data center hardware, software, and licenses for established Component Enterprise Data Centers (CEDCs) and other approved hosting locations. 9.1 Planning and Decision Aid System (PDAS) Equipment Modernization: FY27 increase FY27 ($0.104M) is due to an increase in the scope of the planned data center procurement. 10.1 - 13.1 (NAVWAR) Maritime Operational Battlespace Command & Control (MOB C2) (formerly MOC): FY27 increase ($9.774M) will support the procurement and fielding of Joint Integrated Voice-Video Enterprise Systems (JIVES), formerly Naval Video Services (NVS), at one MOC facility required to provide Distributed Command, Control & Communications (C3). FY27 funds will support MOC workstation LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 3 of 20 P-1 Line #132 Volume 5 - 197 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8106 / Command Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (MWS) upgrades for all MOCs in support of Command-and-Control Ballistic Missile Command (C2MBC) Downloadable Unified Client (DUC) & Integrated Space Situational Awareness (ISSA). Additionally, a onetime increase in FY27 which supports the upgrade of the Arsenal Mission Package (AMP) family of systems expansion located at Commander 7th Fleet (C7F) to support extension of C4I services in support of the Blue Ridge Move Ashore initiative for C7F operations Crisis to Conflict. Hardware and software procurements will expand user capability to enable Operational Commanders the ability to provide robust and reliable Command and Control (C2) capability for their Fleet forces distributed throughout the Area of Responsibility (AOR). 14.1 Facilities Related Control Systems (FRCS): FY27 decrease ($1.750M) due to required component procurement in previous FY and moving into an OMN supported phase of the mission to secure the critical sites. 14.4 More Situational Awareness Industrial Control Systems (MOSAICS): FY27 decrease ($2.895M) is to required components having been procured in previous FY and moving into an OMN & operational supported phase of the mission. 16.1 (BSO60) P-130 NAS Sigonella - Comms Center (79S): FY27 decrease ($0.351M) will not support complete procurement and install of Defense Information System Agency (DISA) node and command IT services. 16.2 (BSO60) P-131 NCTAMS Det Souda Bay - Comms Center (79S): FY27 increase ($0.028M) will support procurement and install of Defense Information System Agency (DISA) node and command IT services. 18.1 (BSO60) BCO Infrastructure Replacement (Cable & Equipment) (40B): FY27 decrease ($0.135M) will delay maintenance costs for Base Communications Office (BCO) Infrastructure Replacement at Naval Computer and Telecommunications Station Far East (NCTSFE). 18.3 (BSO60) High Frequency Global Communication System (HFGCS 36A1): FY27 increase ($1.485M) supports the procurement of antennas for Yokota and Guam. The High Frequency Global Communications System (HFGCS) is a network of single sideband shortwave transmitters used to communicate with aircraft in flight, ground stations, and Navy surface assets. 18.4 (BSO60) Live Virtual Constructive (LVC) Training: FY27 increase ($1.273M) to fund development and integration of Live, Virtual, Constructive (LVC) enabled training events. 22.1 (BSO60) European Deterrence Initiative: FY27 increase ($1.977M) to support force protection and physical security requirements and Logistics Service Area (LSA) infrastructure in Naval Forces EuropeAfrica AOR {Somalia Persistent Presence}. 24.1 (BSO60) Maritime Operations Center (MOC) Server Room: FY27 increase ($1.293M) funding to support 9 required MOC Certification, sustainment and mission rehearsal events per year. Includes scenario development, scripting, C4I, M&S testing, MOC planning and training during LSE and MAKO series events. 28.1 (BSO60) Prototype with three nodes: FY27 increase ($8.955M) funding to support TS Coalition Comms with Norway which will leverage existing circuits, systems, hardware, and accreditations to the maximum extent practicable to deliver and sustain a robust communication and collaboration capability with multiple USEUCOM partners. LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 4 of 20 P-1 Line #132 Volume 5 - 198 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Command Support Equipment Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) NCIS 1.1) NCIS Data Modernization & Analytical Tools A (1)(†) Subtotal: 1) NCIS 2,877.923 - 13 37.413 2,914.000 1 2.914 2,997.000 1 2.997 5,862.000 - 37.413 - - 2.914 - - 2.997 - 12 5.285 - - - - - - 5 11.376 - - - - - 16.661 - - - - - 1 5.862 - - - 5,862.000 1 5.862 - 5.862 - - - - - 5.862 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2) Tech Refresh 2.1) MAHRS Total Force HR IT Modernization Solutions A 2.2) FIP A 440.417 Subtotal: 2) Tech Refresh 2,275.200 - - 3) Insider Threat 3.1) Hardware/ Software License Procurement - HUB A 3.2) Hardware/ Software License Procurement - UAM A Subtotal: 3) Insider Threat 500.000 1 0.500 - - - - - - - - - - - - - - - 500.000 1 0.500 - - - - - - - - - - - - - - - 1.000 - - - - - - - - - - - - - - - 53.142 - - - - - - - - - - - - - - - - 53.142 - - - - - - - - - - - - - - - 3.845 529 2.034 - - - - - - - - - - - - - - - 4.472 269 1.203 - - - - - - - - - - - - - - - 77.143 14 1.080 - - - 5.412 18 0.097 5.552 1 0.006 - - - 5.552 1 0.006 45.844 173 7.931 106.121 1 0.106 108.000 2 0.216 110.408 3 0.331 - - - 110.408 3 0.331 4.271 877 3.746 1.560 112 0.175 1.600 1 0.002 1.650 43 0.071 - - - 1.650 43 0.071 65.387 31 2.027 114.444 1 0.114 116.733 3 0.350 119.068 2 0.238 - - - 119.068 2 0.238 - - 4) Aviation Support Equipment 4.1) Tension Fabric Shelters A Subtotal: 4) Aviation Support Equipment 53,142.000 - 1 5) Electronic Military Personnel Record System (EMPRS) 5.1) Selection Board Management HW SW A 5.2) Client Management HW SW A 5.3) Network Devices A 5.4) Storage Devices A 5.5) Workstations (Sel A (2)(†) (3)(†) Board) (4)(†) 5.6) Scanners High Speed (5)(†) A A 14.952 210 3.140 7.559 71 0.537 7.694 54 0.415 7.848 51 0.400 - - - 7.848 51 0.400 5.8) Sel Board Display A 249.000 2 0.498 - - - - - - - - - - - - - - - 5.9) Servers A 123.333 30 3.700 - - - - - - - - - - - - - - - 5.7) Peripherals (6)(†) LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 5 of 20 P-1 Line #132 Volume 5 - 199 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.10) Content Management HW SW A 5.11) Records Mgmt. A Software (7)(†) 5.12) Configuration Management HW SW A 5.13) Data Center Consolidation (DCC) A 5.14) Electronic System Upgrade A MAIS Code Unit Cost (8)(†) ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) (Each) Unit Cost ($ M) ($ K) 8.837 221 1.953 - 768.000 4 3.072 35.020 142.500 2 0.285 - 1,222.000 5 6.110 5,028.500 2 10.057 - - - - - - - Subtotal: 5) Electronic Military Personnel Record System (EMPRS) - FY 2027 Base Total Cost Qty Aggregated Items Title: Command Support Equipment 4 - 1,402.000 1 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - 0.140 35.708 12 0.428 36.300 12 0.436 - - - 36.300 12 0.436 - - - - - - - - - - - - - 0.179 - - - - - - - - - - - 1.402 1,823.000 1 1.823 179.000 1 179.000 1 0.179 - - 46.836 - - 2.474 - - 3.331 - - 1.661 - - - - - 1.661 29.000 100 2.900 - - - - - - - - - - - - - - - - - 2.900 - - - - - - - - - - - - - - - 6) MPTE Core Transformation 6.1) MPTE Core Transformation PeopleSoft Licenses A Subtotal: 6) MPTE Core Transformation 7) CCTV Procurement RTC Great Lakes 7.1) CCTV Design, Procurement, Installation, Testing A 7.2) CCTV Procurement RTC Great Lakes A 3,155.000 1 3.155 - - - - - - - - - - - - - - - 172.000 1 0.172 - - - - - - - - - - - - - - - Subtotal: 7) CCTV Procurement RTC Great Lakes - - 3.327 - - - - - - - - - - - - - - - - - 56.511 - - - - - - - - - - - - - - - - - 56.511 - - - - - - - - - - - - - - - - - 3.302 - - 1.033 - - 0.933 - - 1.037 - - - - - 1.037 - - 3.302 - - 1.033 - - 0.933 - - 1.037 - - - - - 1.037 - - - - - - - - 10.356 - - - - - 10.356 8) NAVWAR Prior Year Funding Only 8.1) BSO 39 Prior Year A Subtotal: 8) NAVWAR Prior Year Funding Only 9) Planning and Decision Aid System (PDAS) 9.1) PDAS Equipment Modernization (9) A Subtotal: 9) Planning and Decision Aid System (PDAS) 10) Maritime Operational Battlespace Command & Control (MOB C2) Procurement 10.1) C7F SCIF Ashore (10) A - - LI 8106 - Command Support Equipment Navy - UNCLASSIFIED Page 6 of 20 P-1 Line #132 Volume 5 - 200 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 10.3) Baseline Equipment - Ashore A 10.4) Baseline Equipment - Afloat A MAIS Code (11)(†) (12)(†) Subtotal: 10) Maritime Operational Battlespace Command & Control (MOB C2) Procurement Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Command Support Equipment Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 314.419 117 36.787 175.750 8 1.406 188.500 8 1.508 178.500 8 1.428 - - - 178.500 8 1.428 223.091 22 4.908 163.000 2 0.326 185.500 2 0.371 171.500 2 0.343 - - - 171.500 2 0.343 - 41.695 - - - 1.732 - - 1.879 - - 12.127 - - - - - 12.127 11) Maritime Operational Battlespace Command & Control (MOB C2) Production Support 11.1) Production Support - Ashore (13) 11.2) Production Support - Afloat 11.3) DSA (14) A A A (15) Subtotal: 11) Maritime Operational Battlespace Command & Control (MOB C2) Production Support - - 1.487 - - 0.079 - - 0.092 - - 0.088 - - - - - 0.088 - - 0.316 - - 0.017 - - 0.022 - - 0.017 - - - - - 0.017 - - 0.649 - - 0.340 - - 0.122 - - 0.105 - - - - - 0.105 - - 2.452 - - 0.436 - - 0.236 - - 0.210 - - - - - 0.210 12) Maritime Operational Battlespace Command & Control (MOB C2) Ashore 12.1) Installations Ashore (16) A Subtotal: 12) Maritime Operational Battlespace Command & Control (MOB C2) Ashore - - 21.925 - - 0.862 - - 0.832 - - 0.473 - - - - - 0.473 - - 21.925 - - 0.862 - - 0.832 - - 0.473 - - - - - 0.473 13) Maritime Operational Battlespace Command & Control (MOB C2) Installations 13.1) Installations Afloat (17) A Subtotal: 13) Maritime Operational Battlespace Command & Control (MOB C2) Installations - - 2.776 - - 0.248 - - 0.239 - - 0.150 - - - - - 0.150 - - 2.776 - - 0.248 - - 0.239 - - 0.150 - - - - - 0.150 3.929 - - 7.037 - - 3.600 - - 1.850 - - - - - 1.850 14) CNIC (NAVFAC) 14.1) Facilities Related Control Systems (FRCS) A (18) 14.2) SABRS Transition Support and Modernize FIS A 14.3) Cyber Protection and Response Capability (CPRC) A 14.4) More Situational Awareness - Industrial A 654.833 6 - - 6.770 - - 0.200 - - - - - - - - - - - - - - 1.400 - - 0.300 - - 0.300 - - 0.300 - - - - - 0.300 - - 1.400 - - 0.800 - - 4.622 - - 1.727 - - - - - 1.727 LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 7 of 20 P-1 Line #132 Volume 5 - 201 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] Control Systems (MOSAICS) ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Command Support Equipment Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) (19) Subtotal: 14) CNIC (NAVFAC) - - 13.499 - - 8.337 - - 8.522 - - 3.877 - - - - - 3.877 2.714 - - - - - - - - - - - - - - - 2.714 - - - - - - - - - - - - - - - 15) US Fleet Forces Command 15.1) P-013 C4I Wahiawa A Subtotal: 15) US Fleet Forces Command 678.500 - 4 - 16) USFFC (NAVIFOR) 16.1) P-130 NAS Sigonella - Comms Center (79S) A (20)(†) 16.2) P-131 NCTAMS Det Souda Bay Comms Center (79S) 1,800.333 3 5.401 2,672.000 1 2.672 2,510.000 1 2.510 2,159.000 1 2.159 - - - 2,159.000 1 2.159 2,559.750 4 10.239 1,937.000 1 1.937 1,457.000 1 1.457 1,485.000 1 1.485 - - - 1,485.000 1 1.485 A (21)(†) Subtotal: 16) USFFC (NAVIFOR) - - 15.640 - - 4.609 - - 3.967 - - 3.644 - - - - - 3.644 17) New P40A Grouping 17.1) P-621 C4I Equip Naval Comp & Telecomm Station Rota Spain (79S) A 17.2) P-913 C4I/IT Equipment Naval Computer and Telecomm Atlantic A 17.3) Joint Regional Security Stack (JRSS) A Subtotal: 17) New P40A Grouping 950.000 5 4.750 - - - - - - - - - - - - - - - 2,981.667 3 8.945 - - - - - - - - - - - - - - - 2,971.000 2.971 - - - - - - - - - - - - - - - - 16.666 - - - - - - - - - - - - - - - 652.529 34 22.186 1.165 - - - 2,751.636 11 30.268 - - - - - - 1,309.750 4 5.239 976.800 5 4.884 1,592.250 4 6.369 - - - 1,592.250 4 6.369 1.270 560.000 1 0.560 5,129.000 1 5.129 6,402.000 1 6.402 - - - 6,402.000 1 6.402 - 1 18) New P40A Grouping 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) A 18.2) Electrical Power A 1,254.000 1 1.254 1,300.000 1 1.300 1,165.000 1 1,165.000 1 1.165 (22)(†) (†) Systems (36A1) 18.3) High Frequency Global Communication System (HFGCS 36A1) - - - - - - - - - - - A - (23)(†) 18.4) Live Virtual Constructive A 423.333 LI 8106 - Command Support Equipment Navy 3 UNCLASSIFIED Page 8 of 20 P-1 Line #132 Volume 5 - 202 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] (LVC)Training NIWDC (61K) ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Command Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) (24)(†) 18.5) INFOCON 3 Security Compliance A 18.6) Defense Red Switch Network Replacement A 18.7) C4I for U.S. Naval Forces Europe (NAVEUR) A 18.8) Mobile User Objective System (MUOS) A 18.9) NCDOCs Classified and Unclassified Networks A 18.10) Navy/Space Aggressor Support NAVIFOR A 18.11) Deployable COOP Variant (OCO) A Subtotal: 18) New P40A Grouping 772.400 10 7.724 - - - - - - - - - - - - - - - 1,219.300 10 12.193 - - - - - - - - - - - - - - - 3,000.000 1 3.000 - - - - - - - - - - - - - - - 8,000.000 1 8.000 - - - - - - - - - - - - - - - 2,122.000 2 4.244 - - - - - - - - - - - - - - - 1,166.667 3 3.500 - - - - - - - - - - - - - - - - - 3.230 - - - - - - - - - - - - - - - - - 95.615 - - 7.053 - - 11.313 - - 13.936 - - - - - 13.936 18 20.043 - - - - - - - - - - - - - - - - 20.043 - - - - - - - - - - - - - - - 8.662 - - - - - - - - - - - - - - - 1.200 - - - - - - - - - - - - - - - 19) Deployable Deployable Mission Support Systems (DMSS) Kits 19.1) Deployable Mission Support Systems (DMSS) A Subtotal: 19) Deployable Deployable Mission Support Systems (DMSS) Kits 1,113.500 - 20) Briefing Displaying System (BDS) Upgrade - NAVCENT 20.1) Briefing Display System Upgrade A 20.2) MOC Server Room Reconfiguration A 20.3) NAVCENT Rapid Response A (†) Kits 20.4) NAVCENT JMAST Early Entry Kits (EEK) A (†) 20.5) NAVCENT VTC Upgrade/ MS A (†) TEAMS Integration Subtotal: 20) Briefing Displaying System (BDS) Upgrade - NAVCENT 8,662.000 - 1 - 2,951.000 1 2.951 - - - - - - - - - - - - - - - 3,772.000 1 3.772 - - - - - - - - - - - - - - - 4,811.000 1 4.811 - - - - - - - - - - - - - - - 21.396 - - - - - - - - - - - - - - - - - LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 9 of 20 P-1 Line #132 Volume 5 - 203 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Command Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 22) New P40A Grouping 22.1) European Deterrence Initiative A (25)(†) 1,900.000 Subtotal: 22) New P40A Grouping - 2 - 3.800 - - - - - - 1,977.000 3.800 - - - - - - - 1 1.977 - - - 1,977.000 1 1.977 - 1.977 - - - - - 1.977 23) Undersea Warfare Decision Support System - CNE 23.1) Hardware and Software A 23.2) Production Engineering Support A 1,500.000 1 1.500 - - - - - - - - - - - - - - - 400.000 1 0.400 - - - - - - - - - - - - - - - 1.900 - - - - - - - - - - - - - - - 13.530 - - - - - - - - 1.293 - - - - - 1.293 13.530 - - - - - - - - 1.293 - - - - - 1.293 Subtotal: 23) Undersea Warfare Decision Support System - CNE - - 24) MOC Server Room 24.1) Maritime Operations Center (MOC) Server Room A 13,530.000 1 (26) Subtotal: 24) MOC Server Room - - 25) Navy Enterprise Tactical Command and Control (NETC2) 25.1) Briefing Display System (BDS) Delta A 25.2) Navy Enterprise Tactical Command and Control (NETC2) A 3,120.000 1 3.120 - - - - - - - - - - - - - - - 2,500.000 2 5.000 - - - - - - - - - - - - - - - 8.120 - - - - - - - - - - - - - - - Subtotal: 25) Navy Enterprise Tactical Command and Control (NETC2) - - 26) U.S. Pacific Fleet 26.1) Canopy Shelters A 26.2) Tension Fabric Shelters A 26.3) VTC and Communications A 2,773.667 3 8.321 - - - - - - - - - - - - - - - 2,150.000 2 4.300 - - - - - - - - - - - - - - - Subtotal: 26) U.S. Pacific Fleet - - 0.620 - - - - - - - - - - - - - - - - - 13.241 - - - - - - - - - - - - - - - 1.460 - - - - - - - - - - - - - - - 1.460 - - - - - - - - - - - - - - - 27) BRIG MIRAMAR STAFF DURESS SYSTEM 27.1) BRIG MIRAMAR STAFF DURRESS A (†) SYSTEM 1,460.000 Subtotal: 27) BRIG MIRAMAR STAFF DURESS SYSTEM - 1 - 28) TS Critical Coalition Comms [NAVEUR] LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 10 of 20 P-1 Line #132 Volume 5 - 204 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 28.1) Prototype with A MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Command Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($ K) - - - - - - - - - Subtotal: 28) TS Critical Coalition Comms [NAVEUR] - - 0.000 - - - - - - - Total - - 517.564 - - 29.698 - - 34.249 - three nodes (27) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Qty (Each) 2,985.000 FY 2027 OOC Total Cost ($ M) 3 Unit Cost ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) 2,985.000 ($ M) 8.955 - - - 3 8.955 - 8.955 - - - - - 8.955 - 55.202 - - - - - 55.202 indicates the presence of a P-5a Footnotes: (1) FY27 increase ($2.865M) supports refresh of the IT Lifecycle of the Navy Law Enforcement hosting platform systems used to host Law Enforcement Sensitive (LES) and Criminal Justice Information System (CJIS) services for the Navy and support collaboration and interoperation with other Law Enforcement partners to include Department of Justice (DOJ), Department of Homeland Security (DHS), Department of State (State), Military Criminal Investigative Organizations (MCIO), and local/state/tribal Law Enforcement entities. (2) (3) FY27 decrease ($0.091M) is due to sustainment of the EMPRS program, providing technology refreshment (TR) throughout the years (evolutionary) as opposed to a TR every eight years. FY27 increase ($0.115M) is due to the reduced quantity of storage devices for Network Devices in association with Electronic Military Personnel Records System (EMPRS) required. Funds provided for life cycle replacement of storage devices. (4) FY27 increase ($0.069M) is due to requirement for additional workstations in association with workstations for the Selection Board with Electronic Military Personnel Records System (EMPRS). Funding supports retired, active, and reserve military personnel in the functional areas of selection board operations, casualty management, mobilization, veteran benefits (providing automated Sailor information to the Veterans Administration) and other military personnel management functions. (5) FY27 decrease ($0.112M) is provided for High-Speed Scanners in association with EMPRS. Electronic Military Personnel Records System (EMPRS) is an electronic document/image-based system that serves as the repository for all Department of the Navy official military personnel record images. Funds provide for life cycle replacement of network devices. (6) FY27 decrease ($0.015M) is due to lower peripherals required. Funds support peripherals, which are auxiliary and infrastructure components, that make up and are associated with the EMPRS system. Peripherals include items such as removable walls within boardrooms that function as display screen for military personnel record display, keyboards, printers, monitors, mice for workstations in the boardrooms, etc. Peripherals represent auxiliary and infrastructure components that make up and are associated with the EMPRS system. EMPRS is the major information system which is mutually supported by infrastructure to conduct 160 selection boards on an annual basis. (7) FY27 increase ($0.008M) provided for procurement of software in support of the Electronic Military Personnel Records System (EMPRS). Electronic Military Personnel Records System (EMPRS) is an electronic document/image-based system that serves as the repository for all Department of the Navy official military personnel record images. Funds provide for life cycle replacement of network devices. (8) FY27 decrease ($1.644M) due to the consolidation and application migration efforts and system modernization to sustain security requirements. Funding supports the consolidation and application migration efforts and systems modernization. Funds provide sustainment of data center and application optimization, provide sustainment of data center hardware, software, and licenses for established Component Enterprise Data Centers (CEDCs) and other approved hosting locations as part of the Information Technology (IT) efficiency for the Manpower, Training, and Education (MPT&E) Data Center footprint. The Navy Data Center and commercial cloud resourcing Memorandum of Agreement (MOA) will be implemented by MPT&E along with application hosting costs, continues with consolidation and application migration efforts, and ensure that systems are modernized to sustain security requirements of Navy information and data residing within applications and data centers. (9) FY27 increase ($0.104M) is due to an increase in the scope of the planned data center procurement. (10) FY27 increase ($10.356M) provided for Maritime Operational Battlespace Command & Control (MOB C2) which supports the upgrade of the Arsenal Mission Package (AMP) family of systems expansion located at Commander 7th Fleet (C7F) to support extension of C4I services in support of the Blue Ridge Move Ashore initiative for C7F operations Crisis to Conflict. Hardware and software procurements will expand user capability to enable Operational Commanders the ability to provide robust and reliable Command and Control (C2) capability for their Fleet forces distributed throughout the Area of Responsibility (AOR). (11) FY27 decrease ($0.080M) lessens facilitation, procurement, and integration of Joint Integrated Voice-Video Enterprise Systems (JIVES) required to meet the Distributed Command, Control & Communications (C3) mission. Funding profile will vary each year based on different equipment sets for the current build, as well as upgrades for prior builds/spirals. (12) (13) (14) (15) FY27 decrease ($0.028M) due to consolidating equipment sets required for the MOC C2 systems. FY27 decrease ($0.004M) due to consolidation and application migration efforts. FY27 decrease ($0.005M) due to consolidation and application migration efforts. FY27 decrease ($0.017M) due to consolidation and application migration efforts. LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 11 of 20 P-1 Line #132 Volume 5 - 205 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 (16) (17) (18) (19) P-1 Line Item Number / Title: 8106 / Command Support Equipment Aggregated Items Title: Command Support Equipment FY27 decrease ($0.359M) due to consolidation and application migration efforts. FY27 decrease ($0.089M) due to consolidation and application migration efforts. FY27 decrease ($1.750M) due to required component procurement in previous FY and moving into an OMN supported phase of the mission to secure the critical sites. FY27 decrease ($2.895M) due to required components having been procured in previous FY and moving into an OMN & operational supported phase of the mission. Funding provided for capabilities to improve situational awareness for cyber defender response, disrupt adversary kill chain in an acceptable response threshold, and limit adversary reuse of advanced persistent attacks through enhanced sharing of indicators and mitigations. (20) FY27 decrease ($0.351M) will not support complete procurement and install of Defense Information System Agency (DISA) node and command IT services. Funds provided for Command, Control, Communications, Computers, Collaboration, and Intelligence (C5I) at communications center NAS Sigonella. The new P-130 facility will provide increased mission efficiency and the flexibility to accommodate future missions. Equipment requirements include Defense Information Systems Agency (DISA) Transport, Command, Control, Communications, Computers, and Intelligence (C4I) Distribution Cabling, Audio/Visual Capability, and High Frequency Global Communications System (HFGCS) Scope Command. (21) FY27 increase ($0.028M) will support procurement and installation of Defense Information System Agency (DISA) node and command IT services provided for Command, Control, Communications, Computers, and Intelligence/ Information Technology (C4I/IT) equipment. Due to an increase in network and communication responsibilities as the missions of the existing tenant commands on the base slowly increase, updated equipment is required. (22) FY27 decrease ($0.135K) will delay maintenance costs for Base Communications Office (BCO) Infrastructure Replacement at Naval Computer and Telecommunications Station Far East (NCTSFE). Funding is provided to support of Base Communications Office (BCO) Infrastructure repairs globally. NAVIFOR operates 44 BCO's and maintains a majority of the base cable plants providing voice and data services to joint, coalition, and Navy customers stationed or located on bases globally. (23) FY27 increase ($1.485K) will procure more surveys and replacement of HFGCS antennas at various locations. HFGCS is the primary High Frequency (HF) platform directly supporting U.S. Navy, President of the United States (POTUS), and other Government agencies (air-ground-air/ship-to-shore). (24) FY27 increase ($1.273K) will be used for development and integration of IW-informed LVC-enabled training events for Fleet Response Training Plan (FRTP) and deliver one fully functional IW Team Training Facilities (IWTTF) in Norfolk, and one minimum viable IWTTF in San Diego for unit, staff, and fleet-level training, TTP (tactics, techniques and procedures) development, exercises, and mission rehearsal. Funding is provided to support a realistic IW virtual capability into Live, Virtual, and Constructive (LVC) events via Navy Continuous Training Environment (NCTE). Supports holistic readiness through force generation of effectively trained, resilient Information Warfare forces. (25) FY27 increase ($1.977M) to support force protection and physical security requirements and Logistics Service Area (LSA) infrastructure in Naval Forces Europe-Africa Somalia Persistent Presence. Funding is to provide physical security measures at multiple locations in the Naval Forces Europe - Africa AOR to minimize West African campaign challenges for U.S. Forces in Somalia. Funds for physical security measures within the Naval Forces Europe - Africa AOR (26) FY27 increase ($1.293M) funding to support 9 required MOC Certification, sustainment and mission rehearsal events per year. Includes scenario development, scripting, C4I, M&S testing, MOC planning and training during LSE and MAKO series events. (27) FY27 increase ($8.955M) supports procurement TS Coalition Comms with Norway. LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 12 of 20 P-1 Line #132 Volume 5 - 206 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8106 / Command Support Equipment Aggregated Items: Command Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) 2023 One Dell Way / Round Rock TX 78682 C / FFP NAVSUP Oct 2022 Nov 2022 1 6,520.000 N Jun 2023 2024 One Dell Way / Round Rock TX 78682 C / FFP NAVSUP Oct 2023 Nov 2023 1 2,844.000 N Jun 2024 2025 One Dell Way / Round Rock TX 78682 C / FFP NAVSUP Oct 2024 Nov 2024 1 2,914.000 N Jun 2025 2026 One Dell Way / Round Rock TX 78682 C / FFP NAVSUP Oct 2025 Nov 2025 1 2,997.000 N Jun 2026 2027 One Dell Way / Round Rock TX 78682 C / FFP NAVSUP Oct 2026 Nov 2026 1 5,862.000 N Jun 2027 Qty (Each) RFP Issue Date 1) NCIS 1.1) NCIS Data Modernization & Analytical Tools (1) 1.1) NCIS Data Modernization & Analytical Tools (1) 1.1) NCIS Data Modernization & Analytical Tools (1) 1.1) NCIS Data Modernization & Analytical Tools (1) 1.1) NCIS Data Modernization & Analytical Tools (1) 5) Electronic Military Personnel Record System (EMPRS) 5.3) Network Devices (2) 5.3) Network Devices (2) 5.4) Storage Devices (3) 5.4) Storage Devices (3) 5.4) Storage Devices (3) 5.4) Storage Devices (3) 2026 CDW Govt LLC, Vernon Hills, IL / C/FFP C / FFP Fisc Philadelphia Feb 2026 Feb 2026 18 5.412 N Sep 2026 2027 CDW Govt LLC, Vernon Hills, IL / C/FFP C / FFP FISC Philadelphia Oct 2026 Oct 2026 1 5.552 N Sep 2027 2023 CDW Government LLC, Vernon Hills, IL / NSA Mid South, TN C / FFP Fisc Philadelphia May 2023 May 2023 1 102.000 N Sep 2023 2024 CDW Government LLC, Vernon Hills, IL / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2024 Feb 2024 3 103.000 N Sep 2024 2025 CDW Government LLC, Vernon Hills, IL / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2025 Feb 2025 1 106.121 N Sep 2025 2026 CDW Government LLC, Vernon Hills, IL / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2026 Feb 2026 2 108.000 N Sep 2026 106 11.210 N Sep 2023 5.5) Workstations (Sel Board) (4) 2023 HP / NSA Mid South, TN C / FFP Palo Alto, CA Apr 2023 Apr 2023 5.5) Workstations (Sel Board) (4) 2024 HP / NSA Mid South, TN C / FFP Palo Alto, CA Feb 2024 Feb 2024 15 11.400 N Sep 2024 5.5) Workstations (Sel Board) (4) 2025 HP / NSA Mid South, TN C / FFP Palo Alto, CA Feb 2025 Feb 2025 112 1.560 N Sep 2025 5.5) Workstations (Sel Board) (4) 2026 HP / NSA Mid South, TN C / FFP Palo Alto, CA Feb 2026 Feb 2026 1 1.600 N Sep 2026 2025 Kodak, NSA Mid South, TN / Rochester, NY C / FFP FISC Philadelphia May 2025 May 2025 1 114.444 N Sep 2025 2026 Kodak, NSA Mid South, TN / Rochester, NY C / FFP FISC Philadelphia May 2026 May 2026 3 116.733 N Sep 2026 2023 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Philadelphia May 2023 May 2023 1 102.000 N Sep 2023 2024 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2024 Feb 2024 2 104.000 N Sep 2024 5.6) Scanners High Speed (5) 5.6) Scanners High Speed (5) 5.7) Peripherals (6) 5.7) Peripherals (6) LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 13 of 20 P-1 Line #132 Volume 5 - 207 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 5.7) Peripherals (6) 5.7) Peripherals (6) 5.11) Records Mgmt. Software (7) 5.11) Records Mgmt. Software (7) 5.13) Data Center Consolidation (DCC) (8) 5.13) Data Center Consolidation (DCC) (8) 5.13) Data Center Consolidation (DCC) (8) O O C P-1 Line Item Number / Title: 8106 / Command Support Equipment Method/Type or Funding Vehicle Aggregated Items: Command Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2025 Feb 2025 71 7.559 N Sep 2025 2026 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Philadelphia Feb 2026 Feb 2026 54 7.694 N Sep 2026 2025 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Norfolk, Philadelphia site Oct 2024 Oct 2024 4 35.020 N Mar 2025 2026 HP, Samsung, Meridia / NSA Mid South, TN C / FFP FISC Norfolk, Philadelphia site Oct 2025 Oct 2025 12 35.708 N Mar 2026 2023 Spawar Data Center Hosting / Spawar, Atlantic North Charleston, SC C / FP North Charlston May 2023 May 2023 1 1,115.000 N Oct 2023 2025 Spawar Data Center Hosting / Spawar, Atlantic North Charleston, SC C / FP North Charleston, SC Apr 2025 Apr 2025 1 1,402.000 N Oct 2025 2026 Spawar Data Center Hosting / Spawar, Atlantic North Charleston, SC C / FP North Charleston, SC Apr 2026 Apr 2026 1 1,823.000 N Oct 2026 (Each) RFP Issue Date 10) Maritime Operational Battlespace Command & Control (MOB C2) Procurement 10.3) Baseline Equipment - Ashore (11) 10.3) Baseline Equipment - Ashore (11) 10.4) Baseline Equipment - Afloat (12) 10.4) Baseline Equipment - Afloat (12) 2025 NIWC Atlantic/Pacific/MDA / Various WR NIWC PAC/LANT Mar 2025 Jun 2025 8 175.750 Y 2026 NIWC Atlantic/Pacific/MDA / Various WR NIWC PAC/LANT Mar 2026 Jun 2026 8 188.500 Y 2025 NIWC Atlantic/Pacific/MDA / Various C / CPFF NIWC PAC/LANT/MDA Mar 2025 Jun 2025 2 163.000 Y 2026 NIWC Atlantic/Pacific/MDA / Various C / CPFF NIWC PAC/LANT/MDA Mar 2026 Jun 2026 2 185.500 Y 2024 NAVFACLANT / Norfolk, VA Various NIWC LANT Oct 2023 Oct 2023 1 3,173.000 N Nov 2021 2025 NAVFACLANT / Norfolk, VA Various NIWC LANT Oct 2024 Oct 2024 1 2,672.000 N Nov 2023 2026 NAVFACLANT / Norfolk, VA Various NIWC LANTNIWC LANT Oct 2025 Oct 2025 1 2,510.000 N Nov 2024 2027 NAVFACLANT / Norfolk, VA Various NIWC LANTNIWC LANT Oct 2026 Oct 2026 1 2,159.000 N Jan 2027 2023 NIWC/ATLANTIC / NIWC/ATLANTIC C / FFP NIWC LANT Jan 2023 Jan 2023 1 3,319.000 N Nov 2022 2024 NIWC/ATLANTIC / NIWC/ATLANTIC Various NIWC LANT Jan 2024 Jan 2024 1 5,327.000 N Nov 2023 16) USFFC (NAVIFOR) 16.1) P-130 NAS Sigonella Comms Center (79S) (20) 16.1) P-130 NAS Sigonella Comms Center (79S) (20) 16.1) P-130 NAS Sigonella Comms Center (79S) (20) 16.1) P-130 NAS Sigonella Comms Center (79S) (20) 16.2) P-131 NCTAMS Det Souda Bay - Comms Center (79S) (21) 16.2) P-131 NCTAMS Det Souda Bay - Comms Center (79S) (21) LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 14 of 20 P-1 Line #132 Oct 2025 Volume 5 - 208 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Command Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 NIWC/ATLANTIC / NIWC/ATLANTIC Various NIWC LANT Oct 2024 Oct 2024 1 1,937.000 N Nov 2024 2026 NIWC/ATLANTIC / NIWC/ATLANTIC Various NIWC LANT Oct 2025 Oct 2025 1 1,457.000 N Nov 2025 2027 NIWC/ATLANTIC / NIWC/ATLANTIC Various NIWC LANT Oct 2026 Oct 2026 1 1,485.000 N Jan 2029 2023 NAVWAR / San Diego Various NSWC Corona Jul 2023 Jul 2023 1 1,119.000 N Oct 2022 2024 NAVWAR / San Diego Various NSWC Corona Jul 2024 Jul 2024 1 1,324.000 N Oct 2023 2025 NAVWAR / San Diego Various NSWC Corona Oct 2024 Oct 2024 1 1,254.000 N Oct 2024 2026 NAVWAR / San Diego Various NSWC Corona Oct 2025 Oct 2025 1 1,300.000 N Oct 2025 2027 NAVWAR / San Diego Various NSWC Corona Oct 2026 Oct 2026 1 1,165.000 N Oct 2026 18.2) Electrical Power Systems (36A1) 2023 NAVFAC EXWC / PORT HUENEME, CA C / FFP Port Hueneme, CA Apr 2023 Apr 2023 1 4,285.000 N Mar 2023 18.2) Electrical Power Systems (36A1) 2024 NAVFAC EXWC / PORT HUENEME, CA C / FFP Port Hueneme, CA Apr 2024 Apr 2024 1 5,293.000 N Apr 2024 2025 AIR FORCE / Washington, DC MIPR Tinker AFB/OK Mar 2025 May 2025 4 1,309.750 N Oct 2025 2026 AIR FORCE / Washington, DC MIPR Tinker AFB/OK Mar 2026 Mar 2026 5 976.800 N Oct 2026 2023 DTIC / Fort Belvoir, VA MIPR Norfolk, VA Feb 2023 Feb 2023 1 420.000 N Mar 2023 2024 DTIC / Fort Belvoir, VA MIPR Norfolk, VA Oct 2023 Oct 2023 1 437.000 N Nov 2024 Item Number / Title [DODIC] 16.2) P-131 NCTAMS Det Souda Bay - Comms Center (79S) (21) 16.2) P-131 NCTAMS Det Souda Bay - Comms Center (79S) (21) 16.2) P-131 NCTAMS Det Souda Bay - Comms Center (79S) (21) O O C P-1 Line Item Number / Title: 8106 / Command Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 18) New P40A Grouping 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) (22) 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) (22) 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) (22) 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) (22) 18.1) BCO Infrastructure Replacement (Cable & Equipment) (40B) (22) 18.3) High Frequency Global Communication System (HFGCS 36A1) (23) 18.3) High Frequency Global Communication System (HFGCS 36A1) (23) 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24)(†) 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24)(†) LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 15 of 20 P-1 Line #132 Volume 5 - 209 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24)(†) 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24)(†) 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24)(†) P-1 Line Item Number / Title: 8106 / Command Support Equipment Aggregated Items: Command Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) 2025 DTIC / Fort Belvoir, VA MIPR Norfolk, VA Oct 2024 Oct 2024 1 560.000 N Nov 2025 2026 DTIC / Fort Belvoir, VA MIPR Norfolk, VA Oct 2025 Oct 2025 1 5,129.000 N Nov 2026 2027 DTIC / Fort Belvoir, VA MIPR Norfolk, VA Oct 2026 Oct 2026 1 6,402.000 N Nov 2027 Various Philadelphia, PA May 2024 May 2024 1 2,951.000 N Dec 2024 C / FFP NSA BAHRAIN Dec 2024 Dec 2024 1 3,772.000 N Dec 2024 PO NSA BAHRAIN Jun 2024 Jun 2024 1 4,811.000 N Apr 2024 NAVSUP / Mechanicsburg, PA C / TBD Mechanisburg, PA Mar 2027 Mar 2027 1 1,977.000 N Mar 2027 RED PEAK TECHNICAL SERVICES LLC / ANCHORAGE AK C / FFP NIWC ATLANTIC CHARLESTON Mar 2024 Mar 2024 1 1,460.000 N Oct 2024 Qty (Each) RFP Issue Date 20) Briefing Displaying System (BDS) Upgrade - NAVCENT 20.3) NAVCENT Rapid Response Kits 2024 20.4) NAVCENT - JMAST Early Entry Kits (EEK) 20.5) NAVCENT - VTC Upgrade/ MS TEAMS Integration (28) 2024 2024 (30) DLA Troop support (29) / Philadephia, PA Naval Surface Warfare Center / Panama City FL Naval Information Warfare Center Atlantic (31) / North Charleston SC 22) New P40A Grouping 22.1) European Deterrence Initiative (25) 2027 27) BRIG MIRAMAR STAFF DURESS SYSTEM 27.1) BRIG MIRAMAR STAFF DURRESS SYSTEM (†) 2024 indicates the presence of a P-21 Footnotes: (28) (29) (30) (31) MIPR accepted by DLA on 24 May 2024 NAVCENT Rapid Response Kits for Joint Mobile Ashore Support Terminal $1,641K Engineering, acquisition and project management for the installation of Collaboration System installations at several Bahrain buildings and rooms. $3.8M Engineering, acquisition and project management for the installation of Collaboration System installations at several Bahrain buildings and rooms. $3.8M LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 16 of 20 P-1 Line #132 Volume 5 - 210 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Command Support Equipment Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 18) New P40A Grouping 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24) Prior Years Deliveries: 1 8 2023 NAVY 1 0 1 8 2024 NAVY 1 0 1 A1 0 8 2025 NAVY 1 0 1 1 8 2026 NAVY 1 0 1 1 8 2027 NAVY 1 0 1 A1 0 1 O C T LI 8106 - Command Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #132 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 211 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Command Support Equipment Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 18) New P40A Grouping 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24) Prior Years Deliveries: 1 8 2023 NAVY 1 1 0 8 2024 NAVY 1 1 0 8 2025 NAVY 1 0 1 8 2026 NAVY 1 0 1 8 2027 NAVY 1 0 1 0 0 A1 0 A1 0 1 O C T LI 8106 - Command Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #132 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 212 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8106 / Command Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Command Support Equipment Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 18) New P40A Grouping 18.4) Live Virtual Constructive (LVC)Training NIWDC (61K) (24) Prior Years Deliveries: 1 8 2023 NAVY 1 1 0 0 8 2024 NAVY 1 1 0 0 8 2025 NAVY 1 1 0 0 8 2026 NAVY 1 1 0 8 2027 NAVY 1 0 1 0 A1 O C T LI 8106 - Command Support Equipment Navy 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #132 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 213 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8106 / Command Support Equipment Aggregated Items: Command Support Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 DTIC - Fort Belvoir, VA 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8106 - Command Support Equipment Navy UNCLASSIFIED Page 20 of 20 P-1 Line #132 Volume 5 - 214 0 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8109 / Medical Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 176.889 176.889 176.889 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 10.122 24.256 54.862 0.000 54.862 27.313 27.156 22.864 - - - - - - - - 10.122 24.256 54.862 0.000 54.862 27.313 27.156 22.864 - - - - - - - - 10.122 24.256 54.862 0.000 54.862 27.313 27.156 22.864 To FY 2031 Complete 23.348 Continuing - Continuing - 23.348 Continuing - Total - Continuing - - 23.348 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Medical Support Equipment (MSE) program funds new medical capability and new technology on naval operating ships. MSE configuration management, spares, technical manuals and installations are also funded through this line item. Requirements are determined through Commander, U.S. Fleet Forces Command (USFFC) and Commander, U.S. Pacific Fleet (PACFLT), and procurement is managed by Program Executive Office Unmanned and Small Combatants (PEO USC), Program Management Support Expeditionary Missions (PMS 408). Funding is used to procure modifications or additions to the ships' allowance items identified within the Authorized Medical Allowance List (AMAL) and Authorized Dental Allowance List (ADAL). AMALs and ADALs are unique to specific classes or types of ship or Commands to fulfill its intended health care mission. AMALs and ADALs are approved by the respective Fleet Type Commander (TYCOM) Force Surgeon with concurrence by the Commander, Fleet Forces Command Surgeon. The initiation of a change to the current depth (allowance amount) of material or addition of a new allowance for an item(s) within an AMAL or ADAL results from either a change in the scope of care a specific ship must provide in accordance with its Required Operational Capability (ROC) and Projected Operational Environment (POE) and/or a change in the standard of medical care the assigned personnel are expected to provide. Changes to AMAL and ADAL requirements are determined through Individual Allowance Change Requests, as a result of reviews chaired by TYCOM Fleet Surgeons. The Fleet Hospital/Expeditionary Medical Facility (EMF) program funds critical medical equipment to support and provide theater hospitalization capabilities (commonly referred to as Role III Care) as defined in Joint Publication 4-02 Health Services Support and the EMF ROC and POE. This funding is used to procure investment equipment that supports the standard of care for Casualty Management as determined by the DoW Combat Trauma Surgery Committee. Funds in this line item will be used to procure medical equipment such as Direct Digital Radiology System (DDRS) and Computer Aided Design and Computer Aided Manufacturing (CAD CAM) Milling Machine, Expeditionary Medical Unit (EMU), Expeditionary Resuscitative Surgical Systems (ERSS), En Route Care Systems (ERCS), and Certified Diagnostic Mobile Lab (CDML). Funding provides support the Hospital Ships (USNS COMFORT (USFFC) and USNS MERCY (PACFLT)) major systems replacement. The program is part of the standardization and life cycle management of the MERCY Class Hospital ships sustainability plan. [P40A / Direct Digital Radiology - Procurement]: Funds provided for Direct Digital Radiology systems required for advanced diagnostic imaging. This provides shipboard medical personnel the capability to digitally process, and store images thereby reducing film development time, maintenance, and storage costs. It also provides seamless integration of digital imaging with other systems used in Telemedicine, creating a more efficient process that bypasses chemical processing and provides the ability to digitally transfer and enhance images. [P40A / Direct Digital Radiology - Installation]: Funds provided for Direct Digital Radiology system installation. The systems are required for advanced diagnostic imaging. LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 1 of 8 P-1 Line #133 Volume 5 - 215 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8109 / Medical Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Patient Isolation Wards]: FY 2027 PACFLT (BSO 70) decrease ($0.050M) supports the installation of patient isolation wards for the USNS MERCY. [P40A / Roll-on/Roll-off Role 2 Enhanced Expeditionary Medical Units (EMU)]: The Expeditionary Medical Unit (EMU) is currently defined as a Role 2 capability. EMU provides deployable medical systems afloat/ ashore ISO of DMO in a contested environment. EMU is the future construct for adaptive surgical systems providing more robust surgical services with the ability to treat and move mass casualties within the distributed maritime environment. [P40A / Expeditionary Resuscitative Surgical Systems (ERSS)]: Expeditionary Resuscitative Surgical Systems (ERSSs) are the smallest standard force package of the Navy Expeditionary Health Services Support (NEHSS) family and may be employed afloat, on any vessel, or ashore to provide immediate life and/or limb saving damage control resuscitation and surgery. It is designed to support disaggregated maritime operations and operate in austere environments. [P40A / En Route Care Systems (ERCS)]: En Route Care Systems (ERCSs) are the core capability to patient movement. ERCSs ensure patient degradation does not occur during transport to the next level of care. [P40A / Certified Diagnostic Mobile Lab (CDML)]: Certified Diagnostic Mobile Lab (CDML) provide a modern, agile, and scalable capability to conduct in-theater diagnostics and screening of infectious diseases, both ashore and afloat. CDMLs provide the capability to diagnose infectious diseases in an expeditionary environment. CDMLs are on ships to assess infection and mitigate outbreak. [P40A / Production Engineering Support]: Funding supports activities used to identify, plan, resource, and acquire facilities, hardware, software, documentation, manpower and personnel necessary for planning and management of mission critical Expeditionary Medical Family of Systems components. [P40A / Smart Warehousing]: SMART Warehousing addresses the expansion of the smart warehouse project initiated with congressional added funds. This continues the effort of addressing the requirements of rapid kitting and pre-positioning of Expeditionary Medical Systems. [P40A / Expeditionary Medical Unit (EMU) Ashore Capability]: The Expeditionary Medical Unit (EMU) Ashore Capability supports the equipment required to operate EMU ashore when the ship is unavailable. Initial EMU procurement was funded with ship construction but only provided required equipment to operate afloat. This new ashore capability configuration provides functionality in austere environments, treating casualties as close to point of injury as possible before next level of care transport. LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 2 of 8 P-1 Line #133 Volume 5 - 216 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8109 / Medical Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Medical Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 176.889 - / 10.122 - / 24.256 - / 54.862 - / 176.889 - / 10.122 - / 24.256 - / 54.862 - / - - / 54.862 / 0.000 - / 54.862 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 BUMED (BSO 18) budget decreases by $12.752M. This change reflects the removal of a one-time FY26 congressional increase ($12.00M) and a ($0.752M) realignment of medical equipment funding to match demonstrated programmatic capacity. FY 2027 NAVSEA (BSO 24) Deployable Medical System increase ($43.408M) supports the procurement of QTY (3) Expeditionary Medical Unit (EMUs) Ashore capability configurations that operate in austere environments. FY 2027 PACFLT (BSO 70) decrease ($0.1M) supports the installation of patient isolation wards for the USNS MERCY. LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 3 of 8 P-1 Line #133 Volume 5 - 217 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8109 / Medical Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] 1) BUMED ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Medical Support Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (1) 1.1) Direct Digital Radiology Procurement A (†) 1.2) Direct Digital Radiology Installation A 1.4) Computerized Axial Tomography (CAT) Scan Replacement A 1.5) Digital X-Ray Shelters A 1.6) Logistics Support, Supplies & Equipment Maintenance A 1.7) Radiographic Fluoroscopy w/ Wireless Digital Imaging Option A Subtotal: 1) BUMED 307,960.00 50 15.398 378,500.00 2 0.757 458,000.00 1 0.458 - - - - - - - - - 177,800.00 35 6.223 158,716.71 2 0.317 259,500.00 1 0.260 - - - - - - - - - 1,610K 5 8.049 - - - - - - - - - - - - - - - 797,500.00 4 3.190 - - - - - - - - - - - - - - - 2,532K 1 2.532 - - 0.094 - - 0.103 - - 0.069 - - - - - 0.069 - - 0.968 - - - - - - - - - - - - - - - - - 36.360 - - 1.168 - - 0.821 - - 0.069 - - - - - 0.069 2) Expeditionary Medical Facilities 2.1) Expeditionary Medical Unit (EMU) Recapitalization A 2.2) EMF Tent Replacement A 2.3) EMF Tent Replacement and A Upgrades (2) 2.4) Roll 2 Enhanced COTS & New Capabilities A 2.5) Roll 2 Light Maneuver Operational Equipment Set A 2.6) Computerized Axial Tomography (CAT) Scan Replacement A Subtotal: 2) Expeditionary Medical Facilities 1,843K 3 5.528 - - - - - - - - - - - - - - - 4,087K 1 4.087 - - - - - - - - - - - - - - - 81.843 - - - - - 12.000 - - - - - - - - - - - 13,000K 1 13.000 - - - - - - - - - - - - - - - 1,500K 2 3.000 - - - - - - - - - - - - - - - 1,182K 2 2.363 - - - - - - - - - - - - - - - 109.821 - - - - - 12.000 - - - - - - - - - 0.553 - - - - - - - - - - - - - - - - - 3) U.S. Fleet Forces Command 3.1) [USFFC] Rad Fluoro Replace w/ A 553,000.00 LI 8109 - Medical Support Equipment Navy 1 UNCLASSIFIED Page 4 of 8 P-1 Line #133 Volume 5 - 218 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8109 / Medical Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.2) [USFFC] Oxygen Nitrogen (O2N2) Automated Control Sysem A 3.3) [USFFC] Medical Equipment for EMF DJ A Wireless Digital Imaging Option MAIS Code Unit Cost ($) Qty (Each) Unit Cost ($ M) 901,000.00 Subtotal: 3) U.S. Fleet Forces Command FY 2025 Total Cost 1 ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Medical Support Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.901 - - - - - - - - - - - - - - - - - 4.827 - - - - - - - - - - - - - - - - - 6.281 - - - - - - - - - - - - - - - 2,166.67 300 0.650 - - - - - - - - - - - - - - - 1,150K 1 1.150 - - - - - - - - 0.975 - - - - - 0.975 503,000.00 1 0.503 - - - - - 1.025 - - - - - - - - - 4) PACFLT 4.1) Infusion Pump, Multi-therapy A 4.2) Patient Isolation A Wards (3) 4.3) Radiographic Fluoroscopy w/ Wireless Digital Imaging Option A 4.4) Computerized Axial Tomography (CAT) Scan Replacement A 4.5) AMSCO 5052 Single-Chamber Washer/Disinfector A 4.6) Laboratory Upgrade Vitros 7600 A Subtotal: 4) PACFLT - - - - - 1.004 - - - - - - - - - - - - - - 0.260 - - - - - - - - - - - - - - - - - 0.724 - - - - - - - - - - - - - - - - - 3.287 - - 1.004 - - 1.025 - - 0.975 - - - - - 0.975 207,923.08 13 2.703 698,666.67 3 2.096 682,000.00 1 0.682 - - - - - - - - - 343,272.73 22 7.552 484,000.00 11 5.324 494,000.00 12 5.928 484,000.00 10 4.840 - - - 484,000.00 10 4.840 402,000.00 2 0.804 175,000.00 2 0.350 175,000.00 2 0.350 225,000.00 2 0.450 - - - 225,000.00 2 0.450 5) Deployable Medical Systems 5.2) Expeditionary Resuscitative Surgical Systems (ERSS) 5.3) En Route Care Systems (ERCS) (5)(†) 5.4) Certified Diagnostic Mobile Lab (CDML) A (4)(†) A A (6)(†) 5.5) Expeditionary Medical Facilities Congressional A 5.6) Production Engineering Support A - - 10.000 - - - - - - - - - - - - - - - - - 0.081 - - 0.180 - - 0.050 - - 0.047 - - - - - 0.047 LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 5 of 8 P-1 Line #133 Volume 5 - 219 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8109 / Medical Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.7) Smart A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Medical Support Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) - - - - - - - - 3.400 - - - - - - - - - Subtotal: 5) Deployable Medical Systems - - 21.140 - - 7.950 - - 10.410 - Total - - 176.889 - - 10.122 - - 24.256 - Warehousing (7) 5.8) Expeditionary Medical Unit (EMU) Ashore Capability A (8)(†) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) (Each) ($ M) - - - - 48.481 - - - - 53.818 - - - - - 53.818 - 54.862 - - - - - 54.862 16,160K 3 - Total Cost Qty - 16,160K - 3 48.481 indicates the presence of a P-5a Footnotes: (1) These funds are to be used to procure new technology requirements introduced during recent AMAL/ADAL review. Implementation focuses on L-decks and Carriers meeting Required Operational Capability (ROC) in response to changes in standard of medical care provided to the ship's force by organic medical teams. (2) (3) (4) FY27 funds not required; FY26 funds were Congressional Increase. FY 2027 PACFLT (BSO 70) decrease ($0.050M) supports the installation of patient isolation wards for the USNS MERCY. Expeditionary Resuscitative Surgical Systems (ERSSs) are the smallest standard force package of the Navy Expeditionary Health Services Support (NEHSS) family and may be employed afloat, on any vessel, or ashore to provide immediate life and/or limb saving damage control resuscitation and surgery. It is designed to support disaggregated maritime operations and operate in austere environments. (5) (6) En Route Care Systems (ERCSs) are the core capability to patient movement. ERCSs ensure patient degradation does not occur during transport to the next level of care. Certified Diagnostic Mobile Lab (CDML) provide a modern, agile, and scalable capability to conduct in-theater diagnostics and screening of infectious diseases, both ashore and afloat. CDMLs provide the capability to diagnose infectious diseases in an expeditionary environment. CDMLs are on ships to assess infection and mitigate outbreak. (7) SMART Warehousing addresses the expansion of the smart warehouse project initiated with congressional added funds. This continues the effort of addressing the requirements of rapid kitting and pre-positioning of Expeditionary Medical Systems. (8) The Expeditionary Medical Unit (EMU) Ashore Capability supports the equipment required to operate EMU ashore when the ship is unavailable. Initial EMU procurement was funded with ship construction but only provided required equipment to operate afloat. This new ashore capability configuration provides functionality in austere environments, treating casualties as close to point of injury as possible before next level of care transport. LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 6 of 8 P-1 Line #133 Volume 5 - 220 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8109 / Medical Support Equipment Method/Type or Funding Vehicle Aggregated Items: Medical Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 1.1) Direct Digital Radiology Procurement 2024 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Jun 2025 Jun 2025 3 419,000.00 N 1.1) Direct Digital Radiology Procurement 2025 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Jun 2026 Jun 2026 2 378,500.00 N 1.1) Direct Digital Radiology Procurement 2026 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Sep 2026 Sep 2026 1 458,000.00 N 2023 Naval Medical Logistics Command (NMLRC) / Williamsburg, VA WR DLA- Philadelphia, PA Oct 2022 Apr 2023 10 648,000.00 Y 2024 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2023 Dec 2023 3 685,000.00 Y 2025 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2024 Dec 2024 3 698,666.67 Y 2026 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Oct 2025 Oct 2025 1 682,000.00 Y 2023 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA WR DLA- Philadelphia, PA Feb 2023 Feb 2023 8 465,000.00 Y 2024 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2023 Dec 2023 14 473,000.00 Y 2025 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2024 Dec 2024 11 484,000.00 Y 2026 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Oct 2025 Oct 2025 12 494,000.00 Y 2027 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Oct 2026 Oct 2026 10 484,000.00 Y 2024 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2023 Dec 2023 2 201,000.00 Y (Each) RFP Issue Date 1) BUMED 5) Deployable Medical Systems 5.2) Expeditionary Resuscitative Surgical Systems (ERSS) (4) 5.2) Expeditionary Resuscitative Surgical Systems (ERSS) (4) 5.2) Expeditionary Resuscitative Surgical Systems (ERSS) (4) 5.2) Expeditionary Resuscitative Surgical Systems (ERSS) (4) 5.3) En Route Care Systems (ERCS) (5) 5.3) En Route Care Systems (ERCS) (5) 5.3) En Route Care Systems (ERCS) (5) 5.3) En Route Care Systems (ERCS) (5) 5.3) En Route Care Systems (ERCS) (5) 5.4) Certified Diagnostic Mobile Lab (CDML) (6) LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 7 of 8 P-1 Line #133 Volume 5 - 221 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 5.4) Certified Diagnostic Mobile Lab (CDML) (6) 5.4) Certified Diagnostic Mobile Lab (CDML) (6) 5.4) Certified Diagnostic Mobile Lab (CDML) (6) 5.8) Expeditionary Medical Unit (EMU) Ashore Capability (8) O O C P-1 Line Item Number / Title: 8109 / Medical Support Equipment Method/Type or Funding Vehicle Aggregated Items: Medical Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Dec 2024 Dec 2024 2 175,000.00 Y 2026 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Oct 2025 Oct 2025 2 175,000.00 Y 2027 Defense Logistics Agency, Troop Support, Construction & Equipment / Philadelphia, PA Various DLA- Philadelphia, PA Oct 2026 Oct 2026 2 225,000.00 Y 2027 Naval Medical Logistics Command (NMLRC) / Williamsburg, VA Various DLA- Philadelphia, PA Oct 2026 Oct 2026 3 16,160K Y LI 8109 - Medical Support Equipment Navy UNCLASSIFIED Page 8 of 8 (Each) P-1 Line #133 RFP Issue Date Volume 5 - 222 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Program Elements for Code B Items: 0305192N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 44.709 6.590 8.810 5.213 0.000 5.213 5.514 5.605 5.716 - - - - - - - - - 44.709 6.590 8.810 5.213 0.000 5.213 5.514 5.605 5.716 - - - - - - - - - 44.709 6.590 8.810 5.213 0.000 5.213 5.514 5.605 5.716 To FY 2031 Complete 5.829 Continuing - Continuing - 5.829 Continuing - Total - Continuing - - 5.829 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Fleet SCI IT: This effort delivers and sustains Sensitive Compartmented Information (SCI) network access and information technology (IT) infrastructure and tools to the Maritime Operations Centers and Naval Intelligence Community ashore. This includes desktop hardware, software, and peripherals, network equipment, server hardware and software, video teleconferencing devices, and secure voice over Inernet Protocol (IP) telephones. Office of Naval Intelligence (ONI) Charade RED: (CR) Program terminated. Details available at a higher classification and are submitted in the Congressional Justification Books. The FY 2026 spend plan amount for Support Equipment includes $8,810 thousand of discretionary and $21,946 thousand of mandatory (reconciliation) for a total of $30,756 thousand. [P40A / Fleet Intelligence Capital Equipment Replacement Program (CERP)]: Maintain and modernize Navy GEOINT Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) distributed operations node. Additionally, maintain and modernize modification (MOD) and CERP systems to ensure interoperability with Fleet, Joint, and NGA PED infrastructure and ISR platforms. Space MOD will increase processing, exploitation, and Dissemination (PED) capacity to support 10 lines of Aircraft Intelligence, Surveillance, and reconnaissance (AISR) data. MOD Space is re-engineering 17,345 SQFT of analyst's spaces that includes new fiber, critical power, additional routers for the GEOINT Sub-network, build of network closets, additional power drops, and additional desks to support AISR GEOINT PED and Multi-INT NRT operations ISO of the Fleet. [P40A / SCI Network CERP for MOCs]: Provide resources for a critical, must-fund change proposal (CP) to satisfy COMPACFLT requirement to provision Joint Worldwide Intelligence Communications System (JWICS) in Maritime Operation Centers (MOCs) to provide Fleet Commanders' intelligence on Russia, Ukraine, North Korea and other countries. Project will improve SCI coalition network enclaves on force level ships and the MOCs. [P40A / SCI Communications at MOCs]: SCI services at the MOC transfer to Fleet SCI IT for communication services. Fleet SCI IT (Hopper ISC) will be the single service provider for MOCs ashore, supporting messaging, compartmented, AOR unique and intelligence services. [P40A / SCI Information Assurance (IA)]: Funding enables Navy tactical SCI program capabilities needed for the establishment of an initial capability and fully operational capability to meet full compliance with ICD 502 and provide active cyber defense and incident response of the information environment for the IC and establishes the framework for risk management and authorization (RMF) across all systems that process, store and/or transmit SCI LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 1 of 9 P-1 Line #135 Volume 5 - 223 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Program Elements for Code B Items: 0305192N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Naval Military Intelligence Program (MIP) Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 44.709 - / 6.590 - / 8.810 - / 5.213 - / 44.709 - / 6.590 - / 8.810 - / 5.213 - / - - / 5.213 / 0.000 - / 5.213 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fleet SCI IT: Funding enables continued network and storage equipment sustainment and modernization for the Naval Intelligence community. Funding enables continued network and storage equipment sustainment and modernizes SCI coalition network enclaves on force level ships and the Maritime Operations Centers (MOCs). ONI RED (CR): Program terminated. Funding is used to finance long-term investments for the procurement, production and modernization of satellite communications and electronics equipment required for the sensitive sensor tracking capabilities hosted on LYNX (G5) Mobile User Objective System (MUOS) Ground Station Infrastructure platform systems. The program must acquire and configure advanced LYNX (G5) MUOS satellite communications processing system and sensors components to meet advanced capabilities in support of maritime tracking requirements for US Navy platforms, unmanned systems and Intelligence Community directorates, in for every Combatant Commands (COCOM). LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 2 of 9 P-1 Line #135 Volume 5 - 224 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Naval Military Intelligence Program (MIP) Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Sensitive Compartmented Information (SCI) INFO TECHNOLOGY & SECURITY 1.1) Network Storage Systems I (1)(†) 1.2) Computer Hardware Refresh A A (2)(†) Subtotal: 1) Sensitive Compartmented Information (SCI) INFO TECHNOLOGY & SECURITY 602,789.47 19 11.453 708,000.00 1 0.708 1,205K 1 1.205 750,000.00 1 0.750 - - - 750,000.00 1 0.750 3,726.77 904 3.369 717,000.00 1 0.717 1,222K 1 1.222 836,000.00 1 0.836 - - - 836,000.00 1 0.836 - 14.822 - 1.425 - 1.586 - - - - 62,038.83 103 6.390 2,029K 1 2.029 3,161K 66,500.00 38 2.527 485,000.00 1 0.485 755,000.00 2,114K 1 2.114 502,200.00 5 2.511 516,000.00 1 0.516 804,000.00 1 0.804 588,000.00 1,007K 5 5.033 1,069K 1 1.069 1,663K 1 1.663 970,000.00 940,000.00 1 0.940 - - - - - - - 19.515 - - 4.099 - - 6.383 1.791 - - - - - 1.791 - - - - 3.781 1,066K 1.066 - 3.781 - - - 3.800 - - - - - 2.427 - - - 1.586 1 3.161 1,570K 1 1.570 - - - 1,570K 1 1.570 1 0.755 499,000.00 1 0.499 - - - 499,000.00 1 0.499 - - - - 1 0.588 - - - 588,000.00 1 0.588 1 0.970 - - - 970,000.00 1 0.970 - - - - - - - - - - 3.627 - - - - - 3.627 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.066 - - - - - - - - - - - - - - - - - - - - - - - - - 2) INFO TECHNOLOGY NETWORKING & MODERNIZATION 2.1) Network Equipment upgrades/ refresh 2.2) Video Conference Equip refresh (4)(†) 2.3) Fleet Intelligence Capital Equipment Replacement Program (CERP) A A - - - - - - - - - - - (†) 2.4) SCI Network CERP for MOCs (5)(†) 2.5) SCI Communications at MOCs A (3)(†) A A (6)(†) 2.6) GEOINT Modernization A Subtotal: 2) INFO TECHNOLOGY NETWORKING & MODERNIZATION 3) SCI Information Assurance (IA) 3.1) Equip/Software/ (†) A Licenses Subtotal: 3) SCI Information Assurance (IA) - - (7) 895,500.00 - 2 - 5) New P40A Grouping 5.1) CR Ground Station Equipment CERP A (†) Subtotal: 5) New P40A Grouping 945,250.00 - 4 1 6) Intelligence, Surveillance, and Reconnaissance (ISR) 6.1) ISR (One-Time) A - LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 3 of 9 P-1 Line #135 Volume 5 - 225 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 6.2) Pentagon Raven Rock IT Modernization A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Naval Military Intelligence Program (MIP) Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 1.000 - - - - - - - - - - - - - - - Subtotal: 6) Intelligence, Surveillance, and Reconnaissance (ISR) - - 4.800 - - - - - - - - - - - - - - - Total - - 44.709 - - 6.590 - - 8.810 - - 5.213 - - - - - 5.213 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) NetApp Storage equipment and maintenance High end workstations for analysts as well as normal Capital Equipment Replacement Program (CERP) cycle Cisco routers/switches to replace end of life/service equipment Cisco Desktop Video Teleconferencing / Voice over Internet Protocol (DVTC/VOIP) to replace end of life/service equipment Cisco routers/switches to replace end of life/service equipment at the MOCs Workstations Desktop Video Teleconferencing / Voice over Internet Protocol / Keyboard, Video, Mouse (DVTC/VOIP/KVM) devices to support the MOCs LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 4 of 9 P-1 Line #135 Volume 5 - 226 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Naval Military Intelligence Program (MIP) Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Sensitive Compartmented Information (SCI) INFO TECHNOLOGY & SECURITY 1.1) Network Storage Systems I (1) 2016 Network Appliance / Washington, DC C / FFP ** NO PCO ** Dec 2015 Mar 2016 2 645,000.00 N Aug 2015 1.1) Network Storage Systems I (1) 2017 Network Appliance / Washington, DC C / FFP ** NO PCO ** Dec 2016 Mar 2017 1 1,087K N Aug 2016 1.1) Network Storage Systems I (1) 2018 1.1) Network Storage Systems I (1) 1.1) Network Storage Systems I (1) 1.1) Network Storage Systems I (1) 1.1) Network Storage Systems I Network Appliance / Washington, DC C / CPFF ** NO PCO ** Dec 2017 Mar 2018 1 1,171K N Aug 2017 2019 (8) VARIOUS / Various Various ** NO PCO ** Aug 2019 Nov 2019 1 1,119K N Dec 2019 2020 (9) VARIOUS / Various Various ** NO PCO ** Sep 2020 Dec 2020 1 1,087K N Dec 2020 2021 WESTWIND COMPUTER PRODUCTS, INC. / ALBUQUERQUE, NM C / FFP ** NO PCO ** Mar 2021 Jun 2021 1 461,000.00 N Jun 2021 (1) 2022 VARIOUS / Various C / FFP ** NO PCO ** Sep 2022 Dec 2022 1 293,000.00 N Dec 2022 1.1) Network Storage Systems I (1) 2023 VARIOUS / Various Various ** NO PCO ** Jan 2023 Apr 2023 1 576,000.00 N Apr 2023 1.1) Network Storage Systems I (1) 2024 VARIOUS / Various C / TBD ** NO PCO ** Jan 2024 Apr 2024 1 618,000.00 N Apr 2024 1.1) Network Storage Systems I (1) 2025 VARIOUS / Various C / TBD ** NO PCO ** Jan 2025 Apr 2025 1 708,000.00 N Apr 2025 1.1) Network Storage Systems I (1) 2026 Network Appliance / Washington, DC C / TBD ** NO PCO ** Oct 2025 Oct 2025 1 1,205K N 1.1) Network Storage Systems I (1) 2027 Network Appliance / Washington, DC C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 750,000.00 N 2016 VARIOUS / Various C / TBD ** NO PCO ** Jan 2016 May 2016 127 1,976.38 N Dec 2015 2017 VARIOUS / Various C / TBD ** NO PCO ** Jan 2017 May 2017 1 313,000.00 N Dec 2016 2018 VARIOUS / Various C / TBD ** NO PCO ** Jan 2018 May 2018 1 262,000.00 N Dec 2017 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 2019 (10) PARAGON MICRO INC / LAKE ZURICH, IL C / FFP ** NO PCO ** Dec 2020 Apr 2021 1 238,000.00 N Mar 2020 2020 (11) Ace Technology Partners LLC / ELK GROVE VILLAGE , IL C / FFP ** NO PCO ** Mar 2021 Jul 2021 1 240,000.00 N Mar 2021 2022 (12) VARIOUS / Various C / FFP ** NO PCO ** Sep 2022 Jan 2023 1 259,000.00 N Jan 2023 2023 VARIOUS / Various TBD ** NO PCO ** Jan 2023 May 2023 1 442,000.00 N May 2023 2024 VARIOUS / Various C / TBD ** NO PCO ** Jan 2024 May 2024 1 324,000.00 N May 2024 LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 5 of 9 P-1 Line #135 Volume 5 - 227 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) 1.2) Computer Hardware Refresh (2) O O C P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Aggregated Items: Naval Military Intelligence Program (MIP) Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2025 VARIOUS / Various C / TBD ** NO PCO ** Jan 2025 May 2025 1 717,000.00 N 2026 VARIOUS / Various C / TBD ** NO PCO ** Oct 2025 Oct 2025 1 1,222K N 2027 VARIOUS / Various C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 836,000.00 N 2016 TBD / TBD C / TBD ** NO PCO ** Dec 2015 Mar 2016 25 10,000.00 N Dec 2015 2017 TBD / TBD C / TBD ** NO PCO ** Dec 2016 Mar 2017 1 250,000.00 N Dec 2016 2018 TBD / TBD C / TBD ** NO PCO ** Dec 2017 Mar 2018 1 300,000.00 N Dec 2017 2019 Force 3 Inc. / Crofton, MD C / FFP ** NO PCO ** Sep 2019 Dec 2019 1 325,000.00 N Dec 2019 2020 WESTWIND COMPUTER PRODUCTS, INC. / ALBUQUERQUE, NM C / FFP ** NO PCO ** Sep 2020 Dec 2020 1 338,000.00 N Dec 2020 Qty (Each) RFP Issue Date May 2025 2) INFO TECHNOLOGY NETWORKING & MODERNIZATION 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.1) Network Equipment upgrades/ refresh (3) 2.2) Video Conference Equip refresh (4) 2021 (13) TBD / TBD C / FFP ** NO PCO ** Sep 2021 Dec 2021 1 361,000.00 N Dec 2021 2022 (14) TBD / TBD C / FFP ** NO PCO ** Sep 2022 Dec 2022 1 302,000.00 N Dec 2022 2023 (15) TBD / TBD TBD ** NO PCO ** Jan 2023 Apr 2023 1 1,774K N Apr 2023 2024 TBD / TBD C / TBD ** NO PCO ** Jan 2024 Apr 2024 1 1,790K N Apr 2024 2025 TBD / TBD C / TBD ** NO PCO ** Jan 2025 Apr 2025 1 2,029K N Apr 2025 2026 TBD / TBD C / TBD ** NO PCO ** Oct 2025 Oct 2025 1 3,161K N 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2026 1 1,570K N 2016 TBD / TBD C / TBD ** NO PCO ** Feb 2016 Jun 2016 10 25,000.00 N LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 6 of 9 P-1 Line #135 Dec 2015 Volume 5 - 228 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.2) Video Conference Equip refresh (4) 2.3) Fleet Intelligence Capital Equipment Replacement Program (CERP) 2.4) SCI Network CERP for MOCs (5) 2.4) SCI Network CERP for MOCs (5) 2.4) SCI Network CERP for MOCs (5) 2.4) SCI Network CERP for MOCs (5) 2.4) SCI Network CERP for MOCs (5) 2.4) SCI Network CERP for MOCs (5) 2.5) SCI Communications at MOCs (6) 2.5) SCI Communications at MOCs (6) O O C P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Aggregated Items: Naval Military Intelligence Program (MIP) Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2017 TBD / TBD C / TBD ** NO PCO ** Feb 2017 Jun 2017 1 275,000.00 N Dec 2016 2018 TBD / TBD C / TBD ** NO PCO ** Feb 2018 Jun 2018 1 297,000.00 N Dec 2017 Qty (Each) 2019 (16) Advanced Computer Concepts Inc / McClean, VA C / FFP ** NO PCO ** Sep 2020 Jan 2021 1 302,000.00 N Dec 2020 2020 (17) WESTWIND COMPUTER PRODUCTS, INC. / ALBUQUERQUE, NM C / FFP ** NO PCO ** Apr 2021 Jun 2021 1 318,000.00 N Sep 2021 2023 TBD / TBD C / TBD ** NO PCO ** Jan 2023 Mar 2023 1 375,000.00 N Mar 2023 2024 TBD / TBD C / TBD ** NO PCO ** Jan 2024 Mar 2024 1 410,000.00 N Mar 2023 2025 TBD / TBD C / TBD ** NO PCO ** Jan 2025 Mar 2025 1 485,000.00 N Mar 2025 2020 (18) VARIOUS / Various C / FFP ** NO PCO ** Jul 2021 Oct 2021 1 2,114K N Aug 2021 2020 (19) TBD / TBD C / FFP ** NO PCO ** Jul 2021 Oct 2021 1 500,000.00 N Aug 2020 2021 TBD / TBD C / TBD ** NO PCO ** Aug 2021 Dec 2021 1 344,000.00 N Dec 2021 2022 TBD / TBD C / TBD ** NO PCO ** Sep 2022 Jan 2023 1 280,000.00 N Jan 2023 2023 TBD / TBD C / TBD ** NO PCO ** Jan 2023 May 2023 1 769,000.00 N May 2023 2024 TBD / TBD C / TBD ** NO PCO ** Jan 2024 May 2024 1 618,000.00 N May 2024 2025 TBD / TBD C / TBD ** NO PCO ** Jan 2025 May 2025 1 516,000.00 N May 2025 2020 Countertrade Products Inc / Arvada, CO C / FFP ** NO PCO ** Jun 2020 Sep 2020 1 1,000K N Aug 2020 2021 TBD / TBD C / FFP ** NO PCO ** Jun 2021 Sep 2021 1 1,000K N Aug 2021 LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 7 of 9 P-1 Line #135 RFP Issue Date Volume 5 - 229 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C 2.5) SCI Communications at MOCs (6) 2.5) SCI Communications at MOCs (6) 2.5) SCI Communications at MOCs (6) 2.5) SCI Communications at MOCs (6) P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Aggregated Items: Naval Military Intelligence Program (MIP) Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2022 TBD / TBD C / FFP ** NO PCO ** Sep 2022 Dec 2022 1 797,000.00 N Dec 2022 2023 TBD / TBD TBD ** NO PCO ** Jan 2023 Apr 2023 1 1,171K N Apr 2023 2024 TBD / TBD C / TBD ** NO PCO ** Jan 2024 Apr 2024 1 1,065K N Apr 2024 2025 TBD / TBD C / TBD ** NO PCO ** Jan 2025 Apr 2025 1 1,069K N Apr 2025 2016 TBD / TBD C / TBD ** NO PCO ** Oct 2015 Oct 2015 1 1,291K Y TBD / TBD C / FFP ** NO PCO ** Jul 2021 Jul 2021 1 500,000.00 N TBD / TBD C / TBD ** NO PCO ** Oct 2015 Oct 2015 1 1,276K Y NIWC PAC/TBD / San Diego, CA C / TBD ** NO PCO ** Oct 2021 Dec 2021 1 956,000.00 N Dec 2021 Qty (Each) RFP Issue Date 3) SCI Information Assurance (IA) 3.1) Equip/Software/ Licenses 3.1) Equip/Software/ Licenses 2020 (20) Jul 2021 5) New P40A Grouping 5.1) CR Ground Station Equipment CERP 5.1) CR Ground Station Equipment CERP 2016 2022 (21) 5.1) CR Ground Station Equipment CERP 2023 HPE/JHU APL / Spring, TX/Laurel, MD C / TBD ** NO PCO ** Sep 2023 Nov 2023 1 970,000.00 N Nov 2023 5.1) CR Ground Station Equipment CERP 2024 HPE/JHU APL / Spring, TX/Laurel, MD C / TBD ** NO PCO ** Nov 2023 Jan 2024 1 579,000.00 N Jan 2024 5.1) CR Ground Station Equipment CERP 2025 HPE/JHU APL / Spring, TX/Laurel, MD C / TBD ** NO PCO ** Nov 2024 Jan 2025 1 1,066K N Jan 2025 Footnotes: (8) (9) Various procurement for network procured via simplified acquisition process Various procurement for network procured via simplified acquisition process (10) (11) (12) (13) (14) (15) (16) (17) Simplified Acquisition Simplified Acquisition Simplified Acquisition To be procured via simplified acquisition To be procured via simplified acquisition To be procured via simplified acquisition Procured via simplified acquisition process Procured via simplified acquisition process LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 8 of 9 P-1 Line #135 Volume 5 - 230 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 (18) (19) (20) (21) P-1 Line Item Number / Title: 8114 / Naval MIP Support Equipment Aggregated Items: Naval Military Intelligence Program (MIP) Support Equipment Procurements currently in process via simplified acquisition process. Being procured via simplified acquisition process Procured via Simplfiied Acquisition Rincon Research / Naval Information Warfare Center Pacific, remote Sensing Branch Code 56280 LI 8114 - Naval MIP Support Equipment Navy UNCLASSIFIED Page 9 of 9 P-1 Line #135 Volume 5 - 231 === page 310 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 232 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 31.152 17.941 16.567 15.107 0.000 15.107 16.462 16.124 16.007 16.329 - - - - - - - - - - - - 31.152 17.941 16.567 15.107 0.000 15.107 16.462 16.124 16.007 16.329 - - - - - - - - - - - - 31.152 17.941 16.567 15.107 0.000 15.107 16.462 16.124 16.007 16.329 - Total 145.689 145.689 145.689 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item funds the procurement of various items of equipment to support the operating forces at Naval Stations and related facilities, including, but not limited to the following: Live Firefighting Trainer: Funds provided for new construction, shipping, set-up, and operator training for live fire mobile training devices. The specific live fire device shall be configured to provide both structural fire scenarios, various shipboard fire scenarios and confined space rescue scenarios during hands-on training. Commander, Navy Installations Command (CNIC) Fire and Emergency Services (F&ES) staffing will increase during the next 5 years to meet the new requirements of shipboard manning as a result of the USS Bonhomme Richard (BHR) recommendations requiring the firefighters to receive the required training for certification and proficiency skills in the new trainers located at installations selected. Live fire trainers are essential to supporting Navy live fire training requirements for civilian and military response crews. Inflation costs are factored in to determine amount and type of trainers to be purchased. Mobile Aircraft Training Devices: Funds provided for new construction, shipping, set-up, and operator training for various types of mobile aircraft fire training devices. The live fire device shall have the ability to safely produce propane fuel fires for specific types of aircrafts such as large frame, fighter and helicopters during hands-on training per the selected vendor, supporting Navy live fire training requirements for civilian and military response crews. Shipboard Firefighting Responders, Equipment, and JRM Services: Program provides all-hazards response to shore locations including specialized response to Navy ports. Fund Shipboard Firefighting Responders, Specialty Equipment, and Suppression Apparatus, and Increase Joint Region Marianas (JRM) Fire and Emergency Services to meet mission requirements. Increased funding implements corrective action resulting from Board USS Bonhomme Richard Learning 2 Action and Major Fires review. Recent losses to fleet assets have shown a severe deficiency in the ability to supply large capacity water and personnel resources to battle major shipboard fires while docked at Navy piers. Professional CNIC F&ES firefighters do not have the proper tools to gain access and provide uninterrupted agent application in hazardous conditions, which directly increase the risks of more significant property loss due to rapid fire spread. Request spans increases to current equipment levels (eg hose adapters, nozzles and SCBA compressors), new types of equipment (e.g. firehose that also deliver SCBA air to firefighters) and technology (eg, tablets, thermal imagers and unmanned agent application). Equipment will be allocated to locations with shipboard firefighting requirement. Requested capabilities and funds are not currently in baseline funding. JRM services identified risk to submarines, tenders, Port Operations and ship repair facilities from current manning deficit increases mission degradation. Additional personnel and the requirement of building new fire station for Polaris Point is immediate priority to be completed. Fender/Bumper/Separator Systems: Procurement includes various size and shaped energy absorbing cushions placed between a pier and a ship/submarine or between two ships/submarines. Multiple fenders may be used with different size and types of ships. Various types of filling of air or other material may be procured. Standard type is hydro-pneumatic rubber fender made IAW ISO 17357. May be used for both submarine and surface ships. LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 1 of 6 P-1 Line #136 Volume 5 - 233 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Composite CVN Camels: Procurement of large floating metal or composite structures designed to maintain the proper distance for Carrier Vessel/Nuclear Carrier Vessel (CV/CVNs) to keep the ships from being damaged or damaging the pier structure. Composite CVN Camels are used against the pier to moor an Aircraft carrier on a pier. The camels go against the pier (between the pier and ship) to protect the infrastructure/pier and the ship from damage. It also puts distance between the ship and pier. When USN Carriers are placed alongside a pier the hull design dictates the need to use standoff equipment. The camels requested provide the necessary standoff. These composite camels offer considerable reduction in maintenance due to constructed material. As currently utilized ship support equipment ages it becomes necessary to replace that equipment. Equipment procurement budgets are not adequate to keep up with the demand for ship support equipment. As more ships are placed into service the requirement exceeds currently available support equipment. Submarine Deep Draft Camels: Procurement of very large floating metal structures designed to maintain the proper distance for submarines to keep them from being damaged by the pier. These may be for specific submarine classes (e.g. Fast Attack), or universal (i.e. for all submarine classes). They are used against the pier to moor a submarine on a pier. The camels go against the pier (between the pier and submarine) to protect the infrastructure/pier and the submarine from damage. It puts distance between the submarine to protect special sensors from damage. Universal Submarine Composite Camels: Procurement of universal pierside, composite camels used to breast submarines from piers/wharves. They are fabricated of universal composite material with a modular design. Size is approximately 36 ft. W x 18 ft. H x 17.6 ft. D. Suitable for all classes of submarines. Paint Floats: procurement of floating assets that are used by Port Operations and Ship's Force personnel to facilitate external ship work (blasting, painting, and other maintenance). They can also be used as separators or camels. These can be towed into place, or may even be self-propelled. They may have permanent or movable work platforms installed as needed to assist in reaching work sites. Some may have self-ballasting mechanisms to help maintain stability and come in various sizes. Composite Sub camels: The composite Submarine camels significantly reduce the amount of maintenance required to keep the units serviceable. Older models, reaching the end of serviceability are made of steel and in some cases wood. To overhaul these units requires considerable manpower. The older units do not provide the same level of hull protection the composite units provide. Equipment procurement budgets are not adequate to keep up with the demand for ship support. As more ships are placed into service the requirement exceeds currently available support equipment. DDG Separator/Ships separators: Are designed to allow ships to breast outboard another ship in support of heavy port loading. Ships separators are used to moor two ships together/alongside of each other. When there's many ships in port and pier space is limited, some installations have to place ships (DDG CLASS) together. Utility Floats: Used to moor to an existing pier to moor/dock small craft and tugboats, the current pier configurations does not allow for a safe and effective moor of small craft and tugs. Hydro Pneumatic Sub Fender; the procurement of large floating Pneumatic fenders are designed to maintain the proper standoff distance between submarines when nested and keeping them from being damaged. They also protect the submarine and pier structure when used pier side. These fenders are designed to last 10 years. The current inventory of Hydro-pneumatic fenders are past their service life and require replacement. Logistics Data System (LDS) camels: The LDS Surface Ship Camel was designed to berth DDG and CG class surface vessels. The pier designs require an LDS type camel while berthed. The updated design supports various fleet assets which are designed to maintain the proper standoff distance between nested vessels and keeping them from being damaged. Collateral Equipment: Funds provided for equipment and minor property required to initially outfit new construction financed by the, Military Construction, Navy appropriation or Host Nation funds as outlined in OPNAVINST 11010.20 series (Facilities Projects Manual). [P40A / Live FirefightingTrainer Procurement]: Funds provided for construction, shipping, set-up, and operator training for a live fire mobile training devices. The live fire device shall have the ability to safely produce propane fuel fires during hands-on training per the selected vendor, supporting Navy live fire training requirements for civilian and military response crews. LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 2 of 6 P-1 Line #136 Volume 5 - 234 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Mobile Aircraft Training Devices]: Funds provided for construction, shipping, set-up, and operator training for a mobile aircraft fire training devices. The live fire device shall have the ability to safely produce propane fuel fires during hands-on training per the selected vendor, supporting Navy live fire training requirements for civilian and military response crews. [P40A / Shipboard Firefighting Responders, Equipment, JRM Services]: Funds provided for shipboard firefighting responders, specialty and equipment, and suppression apparatus, and increase Joint Region Marianas (JRM) Fire and Emergency Services to meet mission requirements. [P40A / Port Operations Waterfront Support Equipment]: Funds are provided for the procurement of various waterfront equipment in support of fleet requirements during in port periods. This includes paint floats for hull maintenance, brows and platforms for egress, Big Deck ships ramps for onloading deployment assets, floats for docking tugs, utility floats to support submarines and pontoons for docking small boats. [P40A / Port Operations Fendering Systems]: Funds provided for the procurement of Surface Ship Camels, Fenders, and Ships Separators, designed to berth Surface Ships and Submarines to CNIC installations piers/wharfs. [P40A / Collateral Equipment]: Collateral Equipment: Funds provided for equipment and minor property required to initially outfit new construction financed by the, Military Construction, Navy appropriation or Host Nation funds as outlined in OPNAVINST 11010.20 series (Facilities Projects Manual). LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 3 of 6 P-1 Line #136 Volume 5 - 235 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Operating Forces Supt Equip P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 31.152 - / 17.941 - / 16.567 - / 15.107 - / 31.152 - / 17.941 - / 16.567 - / 15.107 - / - - / 15.107 / 0.000 - / 15.107 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports Shipboard Firefighting Responders Equipment and JRM Services, DDG Separators, Paint Floats, Logistics Data System (LDS) camels, Hydro Pneumatic Sub Fenders, as well as Utility Floats. LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 4 of 6 P-1 Line #136 Volume 5 - 236 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Operating Forces Supt Equip ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Firefighting Trainers 1.1) Live FirefightingTrainer Procurement A (†) 1.2) Mobile Aircraft Training Devices (1)(†) 1.3) Shipboard Firefighting Responders, Equipment, JRM A 1,233K 6 7.400 1,000K 2 2.000 1,000K 2 2.000 1,000K 2 2.000 - - - 1,000K 2 2.000 3,088K 4 12.353 1,304K 1 1.304 1,321K 1 1.321 1,390K 1 1.390 - - - 1,390K 1 1.390 1 1.200 1,545K 1 1.545 442,000.00 1 0.442 - - - 442,000.00 1 0.442 A - - - 1,200K - - 19.753 - - 4.504 - - 4.866 - - 3.832 - - - - - 3.832 - - 3.744 - - 9.670 - - 8.973 - - 7.255 - - - - - 7.255 - - 3.118 - - 3.192 - - 2.155 - - 3.485 - - - - - 3.485 - - 6.862 - - 12.862 - - 11.128 - - 10.740 - - - - - 10.740 - - 4.537 - - 0.575 - - 0.573 - - 0.535 - - - - - 0.535 Subtotal: 3) Collateral Equipment - - 4.537 - - 0.575 - - 0.573 - - 0.535 - - - - - 0.535 Total - - 31.152 - - 17.941 - - 16.567 - - 15.107 - - - - - 15.107 Services (†) Subtotal: 1) Firefighting Trainers 2) Port Operations 2.1) Port Operations Waterfront Support Equipment A 2.2) Port Operations A Fendering Systems (2) Subtotal: 2) Port Operations 3) Collateral Equipment 3.1) Collateral Equipment Support A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) FY27 cost increase due to inflation in laboring materials. FY27 increase will support the procurement of additional Submarine, CVN and DDG fenders to replace aging fendering system in the following regions CNR EUROPE, CNRMA (Northeast), CJRM (Guam), and CNRH (Hawaii) LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 5 of 6 P-1 Line #136 Volume 5 - 237 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Operating Forces Supt Equip FY Contractor and Location Method/Type or Funding Vehicle 1.1) Live FirefightingTrainer Procurement 2024 KFT Fire Trainer, LLC / Allendale, NJ MIPR DLA Sep 2024 Mar 2025 2 1,000K Y 1.1) Live FirefightingTrainer Procurement 2025 KFT Fire Trainer, LLC / Allendale, NJ MIPR DLA Jan 2026 Jul 2026 2 1,000K Y 1.1) Live FirefightingTrainer Procurement 2026 KFT Fire Trainer, LLC / Allendale, NJ MIPR DLA Jan 2026 Jul 2026 2 1,000K Y 1.1) Live FirefightingTrainer Procurement 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Apr 2027 2 1,000K N 2024 KFT/Fireblast / New MFG - CA/NJ MIPR DLA Oct 2023 Oct 2023 1 1,322K Y 2025 KFT/Fireblast / New MFG - CA/NJ MIPR DLA Oct 2024 Oct 2024 1 1,304K Y 2026 KFT/Fireblast / New MFG - CA/NJ MIPR DLA Oct 2025 Oct 2025 1 1,321K Y 1.3) Shipboard Firefighting Responders, Equipment, JRM Services 2025 DLA Troop Support Construction & Equipment / 700 Robbins Ave. Philadelphia, PA 19111-5919 MIPR DLA Dec 2025 Dec 2026 1 1,200K Y 1.3) Shipboard Firefighting Responders, Equipment, JRM Services 2026 DLA Troop Support Construction & Equipment / 700 Robbins Ave. Philadelphia, PA 19111-5919 MIPR DLA Mar 2026 Mar 2027 1 1,545K Y 1.3) Shipboard Firefighting Responders, Equipment, JRM Services 2027 DLA Troop Support Construction & Equipment / 700 Robbins Ave. Philadelphia, PA 19111-5919 C / TBD ** NO PCO ** Mar 2027 Mar 2028 1 442,000.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8118 / Operating Forces Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Firefighting Trainers 1.2) Mobile Aircraft Training Devices (1) 1.2) Mobile Aircraft Training Devices (1) 1.2) Mobile Aircraft Training Devices (1) LI 8118 - Operating Forces Support Equipment Navy UNCLASSIFIED Page 6 of 6 P-1 Line #136 Volume 5 - 238 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8120 / C4ISR Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 172.533 172.533 172.533 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 33.606 36.945 33.975 0.000 33.975 45.131 46.554 49.356 - - - - - - - - 33.606 36.945 33.975 0.000 33.975 45.131 46.554 49.356 To FY 2031 Complete - Total - 50.359 Continuing - Continuing - 50.359 Continuing - Continuing - - - - - - - - - - 33.606 36.945 33.975 0.000 33.975 45.131 46.554 49.356 50.359 Continuing Continuing 1.852 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.602 0.565 5.076 - 5.076 2.212 1.030 1.990 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Navy Expeditionary Command, Control, Communications, Computers, & Intelligence (C4I): C2 Modernization efforts include the procurement, assembly, integration, production testing, and initial training of Small, Medium and Large Scale Communication Systems, and the C4I Tactical Radio Modernization & Communications across Navy Expeditionary Forces (NEF), both Active Component (AC) and Reserve Component (RC). These efforts also include convergence to a common Shore-Based Expeditionary C4I baseline, a single cybersecurity Risk Management Framework (RMF) Authority to Operate (ATO), and the outfitting of Expeditionary Forces' Table of Allowances (TOA) equipment requirements, which includes Wideband Anti Jam Modem System (WAMS) in support of the Expeditionary Deployable Node (EDN), Navy Enterprise Tactical Command and Control (NETC2), Rapid Response Kits (RRK), Expeditionary Tactical Assault Kit (ETAK), and Secure Enclave Access Kits (SEAKIT) (CENTRIX-S Fly Away Kit), which supports the complex communication and coordination needs of expeditionary forces. These procurements are critical to provide Deployable Distributed (D2) Command, Control & Communications (C3) capabilities. [P5 / Navy Expeditionary C4I - C2 Modernization - Active Component]: Funds provided for the procurement of Expeditionary Deployable Nodes (EDN), Rapid Response Kits (RRK), and Expeditionary Tactical Assault Kits (ETAK) in support of Active Components as approved in the Table of Allowance (TOA) equipment requirements within Expeditionary Forces. [P5 / Navy Expeditionary C4I - C2 Modernization - Reserve Component]: Funds provided for the procurement of Expeditionary Deployable Nodes (EDN), Rapid Response Kits (RRK), and Expeditionary Tactical Assault Kits (ETAK) in support of Reserve Components as approved in the Table of Allowance (TOA) equipment requirements within Expeditionary Forces. [P5 / Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-163]: Funding supports the procurement of AN/PRC-163 Controlled Cryptographic Items (CCI) Multi-Channel Handheld Radio which are required to extend the reach of real-time intelligence from command to squad level with seamless crossbanding of satellite communications (SATCOM), Line-of-Sight (LOS) and Beyond Line-of-Sight (BLOS) networks. Access encrypted data from a wide variety of platforms and sensors, while simultaneously networking. Even geographically isolated units can share voice and data, while advancing situational awareness (SA) with an ISR mission module that adds full motion video (FMV) capabilities, as approved in the TOA equipment requirements within Expeditionary Forces. [P5 / Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-167]: Funding supports the procurement of AN/PRC 167 Wideband and Mobile User Objective System (MUOS)-ready radios which are required to meet the multi-domain challenges of any combination of ground, vehicular and airborne missions, simultaneously and independently connecting warfighters through the full frequency range of a broad portfolio of waveforms on each of two channels, as approved in the TOA equipment requirements within Expeditionary Forces. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 1 of 11 P-1 Line #137 Volume 5 - 239 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8120 / C4ISR Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-171]: Funding supports the procurement of AN/PRC 171 Non-Controlled Cryptographic Items (CCI) ensures connectivity with ground-based tactical teams by supporting multiple modes of operation, including wideband MANET and narrowband voice and PLI. Secure, reliable communications in contested and congested environments are supported with in-field upgrades to emerging wideband and narrowband resilient waveforms. [P5 / Navy Expeditionary C4I - Wideband Anti Jam Modem System]: Funding supports the Navy's next generation wideband satellite communications modem that will be integrated with the Navy multiband satellite terminals for communications over the wideband global satellite communications constellation. WAMS will replace the Active Command and Control (AC2) modems. WAMS is the Navy component of the Protected Anti-Jam Tactical SATCOM (PATS) Joint Program. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 2 of 11 P-1 Line #137 Volume 5 - 240 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8120 / C4ISR Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / C4ISR Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 172.533 - / 33.606 - / 36.945 - / 33.975 - / 0.000 - / 33.975 - / 172.533 - / 33.606 - / 36.945 - / 33.975 - / 0.000 - / 33.975 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports hardware procurements, testing, integration, assembly and fielding for ETAK Command and Control (C2) Modernization and Tactical Radio Modernization in support of the Portable Radio Tactical Program. Funding is also required for procurement, integration, fielding and modernization of tactical C4I small, medium and large Scale Communication Systems for Naval Expeditionary forces. These systems include Expeditionary Deployable Node (EDN), Rapid Response Kits (RRK), Expeditionary Tactical Assault Kit (ETAK), and Secure Enclave Access Kits (SEAKIT) (CENTRIX-S Fly Away Kit), which supports the complex communication and coordination needs of expeditionary forces and Wideband Anti Jam Modem System (WAMS). LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 3 of 11 P-1 Line #137 Volume 5 - 241 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8120 / C4ISR Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / C4ISR Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 33.606 36.945 33.975 0.000 33.975 - Gross/Weapon System Cost ($ in Millions) 172.533 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 172.533 Plus CY Advance Procurement ($ in Millions) - - - - - 33.606 36.945 33.975 0.000 33.975 - Total Obligation Authority ($ in Millions) 172.533 FY 2027 Total - - - - - 33.606 36.945 33.975 0.000 33.975 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.602 0.508 2.105 - 2.105 Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - Navy Expeditionary C4I Cost Recurring Cost 1.1.1) Navy Expeditionary C4I - C2 Modernization - Active Component - - 60.557 - - 15.671 - - 12.634 - - 9.739 - - - - - 9.739 - - 12.303 - - 3.917 - - 3.317 - - - - - - - - - - - - 17.500 302 5.285 23.688 423 10.020 24.162 406 9.810 - - - 24.162 406 9.810 - - - 55.000 116 6.380 56.100 140 7.854 54.844 231 12.669 - - - 54.844 231 12.669 - - - 9.804 240 2.353 10.000 242 2.420 10.200 122 1.244 - - - 10.200 122 1.244 - - - - - - 100.000 7 0.700 102.500 5 0.513 - - - 102.500 5 0.513 (1) 1.1.2) Navy Expeditionary C4I C2 Modernization Reserve Component (2) 1.1.3) Navy Expeditionary C4I - Tactical Radio Modernization AN/ PRC-163 (†) (3) 1.1.4) Navy Expeditionary C4I - Tactical Radio Modernization AN/ PRC-167 (†) (4) 1.1.5) Navy Expeditionary C4I - Tactical Radio Modernization AN/ PRC-171 (†) (5) 1.1.6) Navy Expeditionary C4I - LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 4 of 11 P-1 Line #137 Volume 5 - 242 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8120 / C4ISR Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / C4ISR Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Wideband Anti Jam Modem System (†) (6) Subtotal: Recurring Cost - - 72.860 - - 33.606 - - 36.945 - - 33.975 - - - - - 33.975 Subtotal: Hardware - Navy Expeditionary C4I Cost - - 72.860 - - 33.606 - - 36.945 - - 33.975 - - - - - 33.975 Hardware - Consolidated Prior Year Requirements Cost Recurring Cost 2.1.1) Consolidated Prior Year Requirements - - 83.293 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 83.293 - - - - - - - - - - - - - - - - - 83.293 - - - - - - - - - - - - - - - - - 16.380 - - - - - - - - - - - - - - - Subtotal: Support - USFFC BSO 60 Cost - - 16.380 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 172.533 - - 33.606 - - 36.945 - - 33.975 - - 0.000 - - 33.975 Subtotal: Hardware Consolidated Prior Year Requirements Cost Support - USFFC BSO 60 Cost 3.1) Deployable Mission Support Systems (DMSS) Kits (†) indicates the presence of a P-5a Footnotes: (1) FY27 supports hardware procurements, integration, assembly and test for Command and Control (C2) Modernization and Tactical Radio Modernization efforts. Quantities are not provided since various piece parts are being procured for small, medium, and large-scale asset modernization based on approved requirements and priorities via quarterly Technical Review Boards. There are no associated installation costs. Decline in FY27 is associated with the delivery of Expeditionary Deployable Node (EDN). To enhance overall readiness and support the Active component's radio modernization schedule, we've realigned funding between Active and Reserve components in FY27 and the out years funding. This realignment prioritizes procurements that benefit both Active and Reserve units, strategically addressing potential readiness impacts. The goal is to accelerate Active unit wholeness, maximizing operational effectiveness, while ensuring Reserve component and Active component funding are synchronized with their respective program elements, enabling a more integrated and efficient approach to modernization. (2) FY27 funding supports hardware procurements, integration, assembly and test for C2 Modernization and Tactical Radio Modernization efforts. Quantities are not provided since various piece parts are being procured for small, medium, and large-scale asset modernization based on approved requirements and priorities via quarterly Technical Review Boards. There are no associated installation costs. Decline in FY27 is associated with the delivery of Expeditionary Deployable Node (EDN). To enhance overall readiness and support the Active component's radio modernization schedule, we've realigned funding between Active and Reserve components in FY27 and the out years funding. This realignment prioritizes procurements that benefit both Active and Reserve units, strategically addressing potential readiness impacts. The goal is to accelerate Active unit wholeness, maximizing operational effectiveness, while ensuring Reserve component and Active component funding are synchronized with their respective program elements, enabling a more integrated and efficient approach to modernization. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 5 of 11 P-1 Line #137 Volume 5 - 243 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8120 / C4ISR Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / C4ISR Equipment MDAP/MAIS Code: (3) FY27 funding supports Tactical Radio Capability Modernization by funding the hardware procurement, integration, and assembly of AN/PRC-163 radios needed to replace legacy AN/PRC-152As radios. The new AN/PRC-163 radios will support next generation waveforms and provide critical communication equipment necessary to transmit and receive real-time, actionable data, mission orders, intelligence, and engagement status. FY27 average unit costs updated to reflect costs associated with latest configuration which includes cost for additional ancillary equipment such as cable assembly and mission function kits (i.e software, GPS, battery and other hardware kits). (4) (5) (6) FY27 increase supports hardware procurements, integration, assembly and test for C2 Modernization and Tactical Radio Modernization efforts. FY27 funding supports hardware procurements, integration, assembly and test for C2 Modernization and Tactical Radio Modernization efforts. FY27 funding supports hardware procurement integration, assembly and test of Wideband Anti Jam Modem System (WAMS). LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 6 of 11 P-1 Line #137 Volume 5 - 244 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements 1.1.3) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-163 (†) 1.1.3) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-163 (†) 1.1.3) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-163 (†) 1.1.4) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-167 (†) 1.1.4) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-167 (†) 1.1.4) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-167 (†) (†) O O C P-1 Line Item Number / Title: 8120 / C4ISR Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / C4ISR Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Jun 2025 Jan 2026 302 17.500 Y 2026 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Jun 2026 Jan 2027 423 23.688 Y L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Jun 2027 Jan 2028 406 24.162 Y 2025 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Apr 2025 Nov 2025 116 55.000 Y 2026 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Apr 2026 Nov 2026 140 56.100 Y L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Apr 2027 Nov 2027 231 54.844 Y 2027 2027 (7) (8) (Each) 1.1.5) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-171 2025 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Feb 2025 Sep 2025 240 9.804 Y 1.1.5) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-171 2026 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Feb 2026 Sep 2026 242 10.000 Y 1.1.5) Navy Expeditionary C4I Tactical Radio Modernization AN/ PRC-171 2027 L3 Harris Technologies / ROCHESTER, NY C / FFP NAVWAR Feb 2027 Sep 2027 122 10.200 Y 1.1.6) Navy Expeditionary C4I Wideband Anti Jam Modem System 2026 L3 Harris / San Diego, CA C / FP NAVWAR Jan 2026 May 2027 7 100.000 N 1.1.6) Navy Expeditionary C4I Wideband Anti Jam Modem System 2027 L3 Harris / San Diego, CA C / FP NAVWAR Jan 2027 May 2028 5 102.500 Y (9) RFP Issue Date Sep 2024 indicates the presence of a P-21 Footnotes: (7) Procurement, integration, and delivery lead time is 7 months. Timeline incorporates lead time of material as well as additional integration, government test and acceptance of complete system. This schedule supports the need-by date of critical fleet requirements. (8) Procurement, integration, and delivery lead time is 7 months. Timeline incorporates lead time of material as well as additional integration, government test and acceptance of complete system. This schedule supports the need-by date of critical fleet requirements. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 7 of 11 P-1 Line #137 Volume 5 - 245 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8120 / C4ISR Equipment Item Number / Title [DODIC]: 1 / C4ISR Equipment (9) Procurement, integration, and delivery lead time is 16 months. Timeline incorporates long lead time of material, additional integration efforts and government test and acceptance of complete system. This schedule supports the need-by date of critical fleet requirements. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 8 of 11 P-1 Line #137 Volume 5 - 246 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8120 / C4ISR Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT N O V 1 2025 NAVY (10) 0 302 1 2026 NAVY 423 0 423 1 2027 NAVY 406 0 406 2025 NAVY 116 (11) 0 116 2 2026 NAVY 140 (12) 0 140 2 2027 NAVY 231 (13) 0 231 F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (3) - - - - - - 302 0 A - - - - 423 406 (4) A - - - - - - - 116 0 A - - - - - - 140 231 O C T LI 8120 - C4ISR Equipment Navy J A N A - 1.1.4) Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-167 2 D E C B A L A N C E Fiscal Year 2026 Calendar Year 2025 O C T 1.1.3) Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-163 302 Item Number / Title [DODIC]: 1 / C4ISR Equipment N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #137 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 247 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8120 / C4ISR Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 1 2025 NAVY (10) 302 0 1 2026 NAVY 423 0 423 1 2027 NAVY 406 0 406 N O V D E C 2025 NAVY 116 (11) 116 0 2 2026 NAVY 140 (12) 0 140 2 2027 NAVY 231 (13) 0 231 F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (3) - - 423 0 A - - - - - - - 406 0 (4) 0 - 140 0 A - O C T LI 8120 - C4ISR Equipment Navy J A N B A L A N C E 0 - 1.1.4) Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-167 2 Fiscal Year 2028 Calendar Year 2027 O C T 1.1.3) Navy Expeditionary C4I - Tactical Radio Modernization AN/PRC-163 302 Item Number / Title [DODIC]: 1 / C4ISR Equipment N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T 231 N O V 0 D E C J A N F E B P-1 Line #137 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 248 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8120 / C4ISR Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC]: 1 / C4ISR Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 L3 Harris Technologies ROCHESTER, NY 100 500 1,000 0 8 7 15 0 1 7 8 2 L3 Harris Technologies ROCHESTER, NY 100 500 1,000 0 6 7 13 0 1 7 8 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (10) (11) (12) (13) All hardware is delivered to in-service engineering agent (ISEA) at NSWC Panama City and is fielded after appropriate integration and assembly to meet mission requirements is completed All hardware is delivered to in-service engineering agent (ISEA) at NSWC Panama City and is fielded after appropriate integration and assembly to meet mission requirements is completed All hardware is delivered to in-service engineering agent (ISEA) at NSWC Panama City and is fielded after appropriate integration and assembly to meet mission requirements is completed All hardware is delivered to in-service engineering agent (ISEA) at NSWC Panama City and is fielded after appropriate integration and assembly to meet mission requirements is completed. Procurement, integration, and delivery lead time is 16 months. LI 8120 - C4ISR Equipment Navy UNCLASSIFIED Page 11 of 11 P-1 Line #137 Volume 5 - 249 === page 328 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 5 - 250 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 320.707 320.707 320.707 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 47.499 42.860 60.467 0.000 60.467 - - - - - 47.499 42.860 60.467 0.000 60.467 - - - - - 47.499 42.860 60.467 0.000 60.467 112.014 112.014 112.014 122.340 122.340 122.340 101.146 101.146 101.146 To FY 2031 Complete 148.909 Continuing 148.909 148.909 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: DIGITAL SIDE SCAN SONAR (SHIP): Additional high-speed, high-resolution side scan sonar systems are required to meet requirements supporting Mine Warfare (MIW) Operations. The intended system procured will be installed aboard USNS HENSON and additional T-AGS 60 class ships to replicate the system aboard USNS HEEZEN. The procurement will facilitate simultaneous collection of high-resolution imagery at mine warfare resolutions and frequencies. The imagery data is required to generate products that directly support mine warfare, hydrographic, and oceanographic requirements. Side scan sonar data is critical for the detection of small mine-like targets as well as hazards-to-navigation (e.g. wrecks) and characterizing the sea floor over large areas (geologic province). This data is fundamental to execute MIW change-detection doctrine comparing historical data to current data to determine mine-threats. LONG TERM AMBIENT NOISE RECORDING AND REPORTING SYSTEM: This is a moored, acoustic buoy system used to support ISR missions. The buoys are four channel Environmental Acoustic Recording System (EARS) units that will record ambient noise for long time periods within an 8kHz bandwidth. The Environmental Acoustic Recording System buoys will have to be recovered for data processing. SHIP MOVING VESSEL PROFILER (MVP): MVP systems are employed to measure sound velocity from a moving platform, providing practical high-accuracy measurements while the vessel remains underway in survey status. These measurements are critical to meeting accuracy requirements for hydrographic and bathymetric surveys. Shipboard MVP (MVP-300) is the larger complement to the Hydrographic Survey Launch (HSL) MVP (MVP-30) and is intended for use aboard T-AGS 60 class platforms exclusively. System consists of a multi-sensor tow body, computer-controlled winch, over-the-side handling system, and control/data logging workstation. It permits rapid and automated acquisition of Sound Velocity Profile (SVP) data from an underway vessel, significantly increasing multibeam survey accuracy, particularly in complex water masses. SHIP SUBMERSIBLE BALLISTIC NUCLEAR SUPPORT NAVO (85M): Funding is for the procurement of non-acoustic oceanographic measurement systems in support of requirements to assess vulnerability threats to Ship Submersible Ballistic, Nuclear (SSBN) against emergent adversary technologies. Advances in technology provide the means for enhanced environmental characterization and these purchases will enable persistent non-acoustic sensing/data collection, and product generation to characterize oceanographic regions of interest. HYDROGRAPHIC SURVEY LAUNCH (HSL), UNMANNED SURFACE VESSELS (USV): Hull Replacement - Funding to procure USVs with Launch and Recovery System (LARS) to support hydrographic data collection requirements. This will provide NAVOCEANO the capability of providing the HSL-outfitted T-AGS 60 ships with a complimentary pair of USVs that will add an open ocean, blue water USV capability. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 1 of 22 P-1 Line #138 Volume 5 - 251 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A SHIP TO SHORE DATA COMS: The Starshield system provides two-way satellite voice and data broadband communications while underway on an ocean-going vessel. This system is the primary vehicle to transfer data from the ship to the office. C-BAND is critical for providing remote Information Awareness/Information Technology (IA/IT) configuration and upgrade support required for the T-AGS to maintain Authorization to Operate (ATO) approval. CONDUCTIVITY TEMPERATURE DEPTH (CTD) OPTICS PINGER SYSTEM: The Environmental CTD-OPTICS-Pinger Systems are a Life Cycle Replacement (LCR) of the Existing T-AGS 60 Class shipboard system, which has a 10 year LCR period. These systems acquire physical oceanographic data in all water depths used to create hydrographic, bathymetric, acoustic and environmental products in support of safety of navigation, expeditionary warfare, naval special warfare, anti-submarine warfare and mine warfare. These systems also provide synoptic data, which directly supports ocean modeling requirements for the Navy. PRIMARY OCEANOGRAPHIC PREDICTION SYS (POPS) & OCEANOGRAPHIC INFORMATION SYSTEM (OIS) (85H): The POPS program delivers High-Performance Computing (HPC) capability and information technology (IT) infrastructure on specialized hardware and software systems facilitating acquisition, assimilation, processing, analysis, quality control, storage and delivery of assured meteorology and oceanography (METOC) data, information, products and services optimizing weapons and sensors for warfighter support. The Oceanographic Information System (OIS) delivers the operational IT system aboard six T-AGS Class Oceanographic Survey ships to meet the DoW and Navy safe navigation and weapon/sensor performance requirements; and generate and disseminate global oceanographic observations and forecasts to Naval forces. The program is in operations and sustainment. Lifecycle replacement of End-of-Life/End-of-Service (EoL/EoS) system components on a five-year cycle is required to maintain minimum warfighting capability. OTHER PROCUREMENT PRECISE TIME AND ASTROMETRY (OPPTA) (84T): OPPTA, as directed by Joint Chiefs of Staff Instruction (CJCSI) 6130.01J, supports national strategic priorities by providing precise time and astrometry reference frame data to the entire DoW for Assured Position, Navigation and Time (PNT). The Precise Time and Astrometry system is comprised of multiple subsystems including assets that generate crucial parameters for GPS. These subsystems undergo lifecycle replacement in accordance with subsystem requirements and break/replace requirements, therefore subsystem procurement is tied to the fiscal year and is consistently executed to the budget. OTHER PROCUREMENT PRECISE TIME AND ASTROMETRY NETWORK (OPPTAN) (84Z): The Precise Time and Astrometry Network (PTA Network) is the network delivering the United States Naval Observatory (USNO) precise time and astrometry reference frame to the entire DoW as required by national strategic priorities. This system consists of ten mission enclave subsystems located across three sites in Washington, D.C., Colorado Springs, CO, and Flagstaff, AZ. Lifecycle replacements of mission network architecture are in accordance with enclave requirements, is therefore tied to the fiscal year and is consistently executed to budget. OTHER PROCUREMENT VERY LONG BASELINE ARRAY RECEIVERS (OPVLBA) (84T): The Very Long Baseline Array (VLBA) is a critical telescope system supporting United States Naval Observatory (USNO) Earth Orientation Parameter data acquisition and dissemination as required by Joint Chiefs of Staff Instruction (CJCSI) 6130.01J and national strategic priorities. Very Long Baseline Array Receivers captures lifecycle requirements for ten antenna located at ten locations across the United States. These subsystems undergo lifecycle replacement in accordance with subsystem requirements and break/replace requirements, therefore subsystem procurement is tied to the fiscal year and is consistently executed to the budget. OTHER PROCUREMENT PTA TIME AND TIME DISSEMINATION RESILIENCE (OPTTD) (84T): The United States Naval Observatory (USNO) is responsible for providing Precise Time and Time Interval (PTTI) to the Department of War (DoW) under Joint Chiefs of Staff Instruction 6130.01J in direct support of national strategic priorities. The primary source of timing signal is the USNO Master Clock. Precise Time and Astrometry (PTA) Time and Time Dissemination captures requirements for the deployment of more resilience DoW timing architecture founded in a robust DOW Master Clock. Crucial to providing these capabilities is the procurement of advanced clocks and clock technology in support of modernized C5ISRT. PTA EARTH ORIENTATION RESILIENCE (OPEOR) (84T): The United States Naval Observatory (USNO) is the sole source for Earth Orientation Parameters (EOPs) to the DOW. Navigation, GPS and C5ISRT assets require knowledge of EOPs to accurately calculate position. Crucial to the production of EOPs is a pipeline of data collection via an array of radio telescopes. The PTA Earth Orientation Resilience program captures requirements for the deployment of a more resilient EOP production via a trusted and secured architecture. OTHER PROCUREMENT PTA EARTH ORIENTATION COMPUTE RESILIENCE (OPEOC) (84T): The United States Naval Observatory (USNO) is the sole source of Earth Orientation Parameters (EOPs) to the DOW. Navigation, GPS and C5ISRT assets require knowledge of EOPs to accurately calculate position. USNO uses a pipeline of data collection and custom hardware and software, called a correlator, to calculate the EOPs daily. The USNO Correlator is required to be as resilient as the weapon system it supports. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 2 of 22 P-1 Line #138 Volume 5 - 252 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Acoustic Positioning System (USBL) Ultra Short Base Line NAVO (85B)]: The Acoustic Positioning System (APS) is capable of performing Super Short Baseline (SSBL) and Long Baseline (LBL) Acoustic Positioning used to provide high accuracy navigation and positioning of towed bodies, moored systems and Autonomous Underwater Vehicles (AUVs) deployed from T-AGS 60 oceanographic survey vessels. The APS is permanently installed aboard each vessel and supports tracking objects in any direction out to a 5000m radius with a single transponder, or very precise positioning using a series of bottom-mounted transponders. The APS is used to precisely locate lost vehicles or instrumentation for purposes of recovery and to provide acoustic release mechanism and positioning for moored seafloor digital acoustic measurement systems. Funding supports these moored systems that are used to collect data to build gridded databases of layered geo-acoustic descriptions of the ocean floor and low frequency bottom loss databases, collect fleet anti-submarine warfare support measurements, produce high resolution anti-submarine warfare area assessment products, and provide critical environmental input to acoustic transmission loss models. [P40A / OPPMA PTA MISSION APP SYSTEM USNO (84T)]: The United States Naval Observatory is responsible for providing Precise Time and Time Interval (PTTI) to the DoW under CJCSCI 6130.01H in support of national strategic priorities. USNO mission application hardware is a highly customized system responsible for the dissemination of PTTI. [P40A / OPVLBA - Very Long Baseline Array Resilience USNO (84T)]: The Very Long Baseline Array (VLBA) functions as both input and Continuity of Operations (COOP) for all United States Naval Observatory (USNO) Earth Orientation Parameter generation. USNO, per CJCSI 6130.01H and DoDI 4650.06, is responsible for the determination and dissemination of Earth Orientation Parameters (EOPs) to the DoW in support of national strategic priorities. Navigation assets (e.g. GPS) require knowledge of EOPs in order to calculate position. USNO uses data from radio telescopes around the world and a process called Very Long Baseline Interferometry (VLBI) as an essential part of calculating EOPs. Key to this network of telescopes are the ten VLBA antenna. Funding supports the procurement and deployment of Ka-band receivers to address radio frequency interference and to replace end of life hardware. [P40A / OPPTA - Precise Time and Astrometry USNO (84T)]: Funds provided for tech refreshes, instrumentation upgrades, and modernization of components are crucial for maintaining time and Earth Orientation Parameters (EOP) standards in accordance with Joint Chiefs of Staff Instruction (CJCSI) 6130.01H, which dictates USNO responsibility to produce Precise Time and Time Interval (PTTI) data products and Earth Orientation Parameters for use by all Department of War. [P40A / OPTTD - Precise Time and Time Dissemination Resilience USNO (84T)]: Funding supports the procurement of advanced timing suites, two-way transceivers, and modem upgrades, providing additional capabilities and resilience in support of Precise Time and Astrometry Time and Time Dissemination [P40A / OPEOC - Earth Orientation Compute Resilience USNO (84T)]: Funding supports the procurement of the infrastructure of a modernized secure correlator to support Earth Orientation Parameters (EOP) production. [P40A / OPEOR - Earth Orientation Resilience USNO (84T)]: The United States Naval Observatory (USNO) is the sole source for Earth Orientation Parameters (EOPs) to the DOW. Navigation, GPS and C5ISRT assets require knowledge of EOPs to accurately calculate position. Crucial to the production of EOPs is a pipeline of data collection via an array of radio telescopes. The PTA Earth Orientation Resilience program captures requirements for the deployment of a more resilient EOP production via a trusted and secured architecture. [P40A / OPPTAN PTA Network (84Z) USNO]: The Precise Time and Astrometry Network (PTA Network) is the network delivering the United States Naval Observatory (USNO) precise time and astrometry reference frame to the entire DoW as required by national strategic priorities. This system consists of ten mission enclave subsystems located across three sites in Washington, D.C., Colorado Springs, CO, and Flagstaff, AZ. Lifecycle replacements of mission network architecture are in accordance with enclave requirements, is therefore tied to the fiscal year and is consistently executed to budget. [P40A / Conductivity Temp Depth (CTD) Optics Pinger System LCR NAVO (85B)]: Funds provided for Life-Cycle Replacement (LCR) parts for the existing T-AGS 60 Class shipboard system with Conductivity, Temperature, and Depth CTD-OPTICS-Pinger Systems. Each system is comprised of CTD/Optics underwater unit, CTD Deck Unit, Optics sensors, CTD/Optics sensor custom deployment cage, HIPAP transponder (for underwater tracking of the unit), and various electronic components. The costs associated with the CTD-Optics System procurement fluctuates slightly from year to year depending on spares procured. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 3 of 22 P-1 Line #138 Volume 5 - 253 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Nav Map Ref Disk and Patrol Analysis System (PBNZ Support)(85M) NAVO]: Funds provided for sustainment of operational production system (Navigation Map Reference Disk and Patrol Analysis System - NPAS) used in the creation of strategic products (PBNZ) having direct and significant impact on the ability of Ship Submersible Ballistic, Nuclear (SSBN) assets to operate effectively. NPAS additionally supports the creation of critical performance analysis products projected to SSBN assets to enhance operational decision making. Requirement directly supports Secretary of the Navy Instruction (SECNAVINST) 8120.b and OPNAVINST 8120.1. [P40A / Shallow Water Multibeam NAVO (85B)]: The shallow water multibeam sonar system is the primary sea-floor mapping system in littoral waters (10-1000 meters of water). The system collects data used for surface and sub-surface littoral navigation charts, high resolution bathymetry required for ocean models. [P40A / Ship Davits for Hydro Unmanned Surface Vessel (USV) Systems (85B) NAVO]: New T-AGS ship DAVITS for one (1) vessel to accommodate the Unmanned Surface Vehicle replacements of the manned Hydrographic Survey Launches. [P40A / Ship Moving Vessel Profiler (MVP) NAVO (85B)]: Funds support lifecycle replacement of Moving Vessel Profiler (MVP) systems primarily due to obsolescence and availability of support from the manufacturer. These systems are mechanical in nature and have limited service life in a marine environment. [P40A / Ship To Shore Data Comm NAVO (85B)]: Funds provided for Life-Cycle Replacement (LCR) required to replace C-BAND system above deck and below deck equipment. LCR is required to maintain system functionality and optimal performance and to meet expanding requirements for remote communications while underway. [P40A / (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B)]: Funds provided to enhance fleet survey capability of creating surface and sub-surface littoral navigation charts. Military surveys are increasingly gravitating towards autonomous vehicles and emerging technology survey systems (Mission Equipment Systems) are becoming increasingly tailored for use providing enhanced performance and reliability when integrated. [P40A / Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC (85H)]: Funds support Department of War and Primary Oceanographic Prediction System (POPS) guidelines for lifecycle replacement due to equipment obsolescence, End-of-Life/End-of-Service (EoL/EoS) issues, and new technology insertion. Replacing the EoL/EoS POPS system components with High Performance Computing (HPC) technology, petabyte data storage requirements, and the high-speed network connections between the computing and storage components is a five-year replacement cycle, with 20% of the system components replaced each year without increasing the server footprint. Fleet Numerical Meteorology and Oceanography Center (FNMOC) to shift all clusters to include non-HPC infrastructure on all enclaves at their respective lifecycle replacement milestones to a fully as-a-service model. Stable baseline funding is critical to support HPC-as-a-service which eliminates the use of aging hardware & the related cybersecurity findings, decreases redundant IT costs and standardizes/modernizes IT infrastructure. [P40A / AUV Advanced Sensors (85M) NAVO]: Advanced sonar sensors such as Synthetic Aperture Sonar (SAS) module. The new sensors will provide high resolution seabed characterization resulting in high confidence environmental databases. [P40A / Long Term Ambient Noise Recording/Reporting Sys (85M)]: Long Term Ambient Noise Recording and Reporting System is a moored, acoustic buoy system used to support Intelligence, Surveillance, and Reconnaissance (ISR) missions. The buoys are four channel Environmental Acoustic Recording System (EARS) units that will record ambient noise for long time periods within an 8kHz bandwidth. The Environmental Acoustic Recording System buoys will have to be recovered for data processing. [P40A / Mine Warfare (MIW) Autonomous Undersea Vehicles (AUVs) (85M) NAVO]: Two man-portable autonomous undersea vehicles (AUVs) plus spares. One (1) AUV System consisting of three (3) unmanned undersea vehicles with depth capability of up to three hundred (300) meters for medium depth ocean and littoral environmental battlespace awareness seafloor interrogation. [P40A / Multi Sensor Core Logger (MSCL) (85M) NAVO]: Laboratory Multi Sensor Core Logger (MSCL) is the Geology Labs' primary non-destructive analytical instrument which provides high resolution data from multiple sensors of ocean bottom sediment cores used to update geophysical and acoustic databases for the Fleet. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 4 of 22 P-1 Line #138 Volume 5 - 254 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Acoustic Measurement System NAVO (85M)]: Lifecycle replacement and upgrade of digital acoustic measurement systems which provides data used to build gridded databases of layered geoacoustic descriptions of the ocean floor, collects anti-submarine warfare support measurements, produces high resolution anti-submarine warfare area assessment products, and serves to provide critical environmental input to acoustic transmission loss models. System consists of multi-channel variable depth buoys, shipboard data acquisition, control, and processing support systems. Buoys acquire data, provide signal conditioning and gain, and store data in digital form. [P40A / Ship Submersible Ballistic (Nuclear) (SSBN) Support NAVO (85M))]: Funds provided to address gaps in existing oceanographic databases which have been identified as having significant impact on the ability of Ship Submersible Ballistic, Nuclear (SSBN) assets to operate effectively. [P40A / Integrated Sub Bottom Profiler NAVO (85B)]: The sub-bottom profiler system provides high resolution digital acoustic data that describes the physical depth and acoustic characteristics of the ocean bottom and its subsurface layers over full ocean depth. This data is used in the development of products to support Anti-Submarine Warfare (ASW) and Mine Warfare programs with tactical environmental data. In addition, the sub-bottom profiler is used to identify suitable deployment areas for installing bottom-mounted navigational beacons supporting Autonomous Underwater Vehicle (AUV) operations. [P40A / Deep Multibeam Replacement NAVO (85B)]: The full ocean multibeam sonar system is the primary ocean mapping tool in greater than 500 meters of water to full ocean. The deep-water multibeam system will be a state-of-the-art commercial high resolution (min 1x1 degree) multibeam having a minimum swath coverage of six times water depth. The current survey system includes an integrated deep water sub-bottom profiler system. Multibeam systems collect deep-water bathymetry data required to support special chart production for the Navy. [P40A / Shallow Water Seismic System NAVO (85M)]: he shallow water multibeam sonar system is the primary sea-floor mapping system in littoral waters (10-1000 meters of water). The system collects data used for surface and sub-surface littoral navigation charts, high resolution bathymetry required for ocean models [P40A / Oceanographic Information Ships (OIS) Tech Refresh-NAVO (85H)]: Oceanographic Information Ships (OIS)-ship Hardware Life Cyle Replacement (LCR) for all Oceanographic Survey Ships to meet Information Assurance/Maintenance/Mission requirements - Servers, network switches, printers, plotters, etc. [P40A / Oceanographic Ships Virtualization Technology Refresh- NAVO-85H]: Funding this requirement ensures that the oceanographic survey ship collection and processing of data that is provided to the US Navy is accurate meteorological and oceanographic forecast and reports to support worldwide fleet operations. Supports safety of navigation for submarines and surface ships. [P40A / Virtual Storage Demilitarized Zone Life Cycle Replacement-NAVO-85H]: Procurement supports replacement of all A2 chipset virtual computer cluster storage devices (Non-Classified Internet Protocol Router Network (NIPR) Demilitarized Zone (DMZ), Secret Internet Protocol Router Network (SIPR) DMZ, and Disaster Recovery) supporting dissemination of oceanography data and products. The A2 virtual compute cluster consists of the physical host servers and storage used by oceanography commands to host applications, process, and disseminate data. All server-based operations are dependent on the A2 virtual cluster infrastructure. The virtual servers support numerous critical organizational processes. Functions supported include Oceanographic Survey Ships data ingest, external data receipt, data dissemination, gliders, real-time observation processing, and ocean modeling processing are a few of the critical organizational processes. The organizational mission areas include safety of navigation, AntiSubmarine Warfare (ASW), Mine Warfare (MIW), and Expeditionary Warfare (EXW). The virtual clusters also support key cybersecurity/IA and systems management resiliency capabilities such as Assured Compliance Assessment Solution (ACAS), Domain Controllers, systems management servers, and Disaster Recovery (DR). [P40A / Virtual Cluster Technology Refresh-NAVO-85H]: A2 computer chipset Virtual Cluster Hardware: The purpose of this procurement is to replace all of A2 virtual compute clusters, (Non-Classified Internet Protocol Router Network (NIPR) Enclave, NIPR Demilitarized Zone (DMZ), Secret Internet Protocol Router Network (SIPR) and SIPR DMZ). The A2 virtual compute cluster consists of the physical host servers and networking equipment used by Fleet Numerical Meteorology and Oceanography Center (FNMOC) model operations and Naval Oceanographic Office (NAVO) production codes to host applications and process data. All server based operations are dependent on the A2 virtual cluster infrastructure. The A2 virtual clusters are comprised of networking gear and server hosts which support over 300 virtual servers across the different environments (Enclave and DMZ) and NIPR/SIPR classifications. The virtual servers support numerous critical organizational processes. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 5 of 22 P-1 Line #138 Volume 5 - 255 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Functions supported include: Oceanography Survey Ships data ingest, external data receipt National Oceanic and Atmospheric Administration (NOAA), data dissemination, real-time processing, FNMOC ocean model pre-processing, and FNMOC ocean modeling post-processing are a few of the critical organizational processes. Mission areas include: safety of navigation, Anti-Submarine Warfare (ASW), Mine Warfare (MIW), and Expeditionary Warfare (EXW). The virtual clusters also support key cybersecurity/Information Assurance (IA) and systems management resiliency capabilities such as Assured Compliance Assessment Solution (ACAS), Domain Controllers, systems management servers, and Disaster Recovery (DR). [P40A / Life Cycle Replacement Firewall & Cyber Appliances HW-NAVO-85H]: The requirement is to Life Cycle Replacement (LCR) existing Network Firewalls and Intrusion Detection/Protection System appliances reaching End of Life (EOL) on the Primary Oceanographic Prediction System, Oceanography (POPS-OCN). Hardware Tech Refresh for these systems is compulsory and essential to meet the operational mission of POPS-OCN. The appliances directly support and sustain POPS-OCN cyber security processes for the Command, US Navy, Combatant Commander with accurate and secure meteorological and oceanographic products in support of operational armed forces; and enabling Cyber Defense Operations requirements. Life Cycle Replacement of 4X Cyber Firewall appliances required for Unclassified and Classified networks; LCR of 2X cyber switches required. LCR of NIPR and SIPR Intrusion Detection/Protection Systems (3X) required to sustain strategic sensor grid of Navy Cyber Defense Operations in support of cybersecurity operations" [P40A / Life Cycle Replacement (LCR) Ship-to-Shore (S2S) Network HW-NAVO-85H]: The requirement is for Life Cycle Replacement (LCR) of the Ship-to-shore (S2S) network equipment which enables secure communication links between forward deployed survey ships and the operational data center. The S2S network equipment provides survey data transfer, voice communications and access to operational data center and external resources crucial for at-sea operations in support of the numbered fleet commander under Tactical Control (TACON) and the oceanographic production of combatant commander's deliverables. Missions include navigation, Autonomous Underwater Vehicle (AUV)/ unmanned underwater vehicles (UUV), hydrographic, bathymetric, oceanographic and Special Missions. LCR of 23X Layer3 Routers required to sustain cyber compliance for Risk Management Framework (RMF)/High Risk Environment (HRE); Designated routers include: 6 Oceanographic Survey Ships C-Band (2 per ship) = 12; 2 Satellite Data Processing (SDP) (Naval Computer & Telecommunications Area Master Station (NCTAMS)/Satellite Communications (SATCOM) peering 2 per site) = 4; 1 Naval Oceanographic Office (Defense Information Systems Network (DISN) Circuit Point of Presence (PoP) 2 units) = 2; 5 internal Secret Internet Protocol Router Network (SIPR) tunneling routers. Enterprise Mission Assurance Support Service (EMASS) Authorizations to Operate (ATOs): 2495, 3227, 4173. [P40A / Domain Management Systems-NAVO-85H]: Provides centralized management capabilities for the scientific network to include account management (authentication/authorization), systems management functions (patching, license management), email systems, domain name system (DNS), centralized logging systems, cybersecurity vulnerability scanners, host-based intrusion detection (HBSS), and antivirus systems. Capabilities are crucial to ensure cybersecurity compliance and operations of the network. [P40A / High Performance Computing (HPC) Technology Refresh-NAVO-85H]: Procurement replaces all of the components for the High Performance Computing (HPC) cluster. The HPC cluster has reached End of Life (EOL) and technical refresh of the system is required to meet the operational mission and to maintain cyber security compliance. The HPC cluster consists of physical servers, networking equipment, and storage used by various groups at the Naval Oceanographic Office. The physical servers consist of compute cluster scheduling systems, high performance processing systems, and cluster management systems. Functions supported include; Naval Oceanographic Satellite Data Processing (SDP) team import and processing of satellite data and Multi-Channel Sea Surface Temperature (MCSST) data, Data storage and processing to support fleet operations to include Anti-submarine Warfare (ASW), Mine Warfare (MIW), Surface Warfare (SUW), Naval Special Warfare (NSW), Non-Combatant Evacuation Operations (NEO), Undersea Warfare (USW), Amphibious Warfare (AMW), and Expeditionary Warfare (EXW). [P40A / Data Center Network Switches-Life Cycle Replacement (LCR)-NAVO-85H]: The requirement is for the Life Cycle Replacement (LCR) of 18 Data Center network switches for the classified and unclassified networks. The network equipment provides cyber security capabilities to maintain compliance with Authority to Operate (ATO) and Risk Management Framework (RMF) requirements. The functional replacement will provide/sustain the connectivity requirements for IT computing and storage resources that enable the scientific information technology business processes and production to meet the product(s) and battlespace information demands of the combatant commander, services, agencies and field activities (CC/S/A/FA). LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 6 of 22 P-1 Line #138 Volume 5 - 256 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Network Services Life Cycle Replacement Distributed Switches-NAVO-85H]: The requirement is for lifecycle replacement network equipment distributed across the scientific networks. The network components provide IT and cyber security (CS) connectivity services enabling the scientific user community on Unclassified and Classified networks supporting Mission Essential Functions (oceanographic and meteorological products) including oceanographic data collection, modeling, product generation and data dissemination to support operational requirements and battlespace information demands of the combatant commander, services, agencies and field activities. Mission Areas include: Safety of Navigation/ Surface Warfare (SUW), Naval Special Warfare (NSW), Non-Combatant Evacuation Operations (NEO), Undersea Warfare (USW), Amphibious Warfare (AMW), Anti Air Warfare (AAW), and the Intelligence Community (IC). The requirement includes network components hardware and software; Sustainment maintenance covered under the CISCO "GEMSS" contract. (U) The network components (Local Area Network (LAN) switches) for the Distributed Access LAN supporting the unclassified and classified enclave are end of life and cyber support in FY23. The Network Access Control appliances for cyber-802.1X network authentication (Risk Management Framework Category 1 requirement) and the Service Delivery Point Router for Classified telecommunications circuits are end-of life and cyber support in FY24. Replacement is compulsory to sustain IT operations and Authority to Operate (ATO). [P40A / Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H]: Support for the OIS follow-on of the services offered on the Integrated Survey Systems Oceanographic Survey Ship (ISS-60). This system software suite must continue to be tested, upgraded and maintained for interoperability and functionality with new non-IT mission sensors, such as next generation shallow water multi-beam sonars, digital side scan sonar systems, and high precision military global positioning system receivers. The ISS-60 survey software acquires, stores, displays, and processes oceanographic and meteorological data collected by various mission systems using a fiber-optic network configuration. ISS-60 survey software is a critical component in the Naval Oceanographic Office's (NAVOCEANO) ability to collect and integrate oceanographic information in support of surface and subsurface navigation as well as provide environmental characterization of the Battlespace. [P40A / Storage Area Network (SAN) LCR-NAVO-85H]: The requirement is for the replacement of the IT hardware components for the Storage Area Network (SAN) and includes servers and storage devices (tape drives, disk arrays, tapes). The SAN hardware and software is end-of-life/support. This results in numerous high risk cybersecurity vulnerabilities across networks (Non-Classified Internet Protocol Router Network (NIPR) and Secret Internet Protocol Router Network (SIPR)) that cannot be mitigated or resolved without procurement. The life cycle replacement has been deferred since 2019 creating significant operational risk as oceanography data collection, model processing, product generation are dependent on the SAN. Includes Surveys, unmanned underwater vehicles (UUVs), product generation, data dissemination, model processing, data storage, and disaster recovery (DR). Mission areas supported by oceanography data: Surface Warfare (SUW), Naval Special Warfare (NSW), Non-Combatant Evacuation Operations (NEO), Undersea Warfare (USW), Amphibious Warfare (AMW), Anti Air Warfare (AAW), safety of navigation, Anti-Submarine Warfare (ASW), Mine Warfare (MIW), and Expeditionary Warfare (EXW). New FY25 requirement joint letter from United States Fleet Forces Command (USFFC) and United States Pacific Fleet (USPACFLT) will require the Naval Oceanographic Office to be the bathymetry (the measurement of water depth) repository for the Joint Force with more data being ingested will result in additional storage resources required. [P40A / Primary Oceanographic Prediction Sys (POPS)&OIS NAVIFOR HQ (85H)]: The Naval Meteorology and Oceanography Command (NMOC) Cross Domain Solution (CDS) fulfills the mission need to deliver 24/7 global weather and ocean model prediction products, weather satellite imagery products, and associated tactical decision aids and data to support Naval, Joint, and Coalition operations around the globe. These mission products are essential for nearly all combat platforms and weapon systems used by the U.S. Navy, playing a vital role in safeguarding naval vessels and aircraft. Trusted Gateway Systems (TGS), which focuses on image files, along with High-Speed Guard (HSG), processes all non-image file systems at the Fleet Numerical Meteorology and Oceanography Center (FNMOC) in Monterey, CA, handling 14,100 Gigabytes (GB) daily, while the TGS system at the Naval Oceanographic Office in Stennis Space Center, MS, manages 2,475 GB per day. The TGS system facilitates high-bandwidth and high-throughput one-way transfers of oceanographic and meteorological data from the Non-Classified Internet Protocol Router Network (NIPRNET) to the Secret Internet Protocol Router Network (SIPRNET) and the Joint Worldwide Intelligence Communications System (JWICS). This capability ensures timely data assimilation, processing, analysis, and dissemination of information and products within classified environments, enhancing battlespace awareness and decision-making superiority for Navy, Joint, Allied, and Coalition Forces both at sea and on land. Compliance with the National Security Agency (NSA) Raise the Bar requirements is mandatory. [P40A / NOMWC UUV Life-Cycle Replacement NOOC (85M)]: Naval Oceanography Mine Warfare Center (NOMWC) requires the purchase of 3 Commercial Off the Shelf (COTS) Unmanned Underwater Vehicles (UUV) with interferometric side-scan sonar. Systems are used to conduct surveys in support of mine countermeasure (MCM) operations, littoral hydrography surveys (LHS), intelligence preparation of the operational environment (IPOE), change detection, bottom type characterization in confined and shallow/very shallow water waterways of seaports of debarkation and other military or economically significant ports. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 7 of 22 P-1 Line #138 Volume 5 - 257 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Environmental Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 320.707 - / 47.499 - / 42.860 - / 60.467 - / 320.707 - / 47.499 - / 42.860 - / 60.467 - / - - / 60.467 / 0.000 - / 60.467 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 budget will procure the following: 2.3) OPVLBA - Very Long Baseline Array Resilience USNO (84T): FY27 funds decrease ($1.200M) due to program reduction in Very Long Baseline Array VLBA subsystem procurements. 2.4) OPPTA - Precise Time and Astrometry USNO (84T): FY27 funds decrease ($2.579M) due to program reduction. 2.5) OPTTD - Precise Time and Time Dissemination Resilience USNO (84T): FY27 fund increase ($16.000M) due to the unique equipment modernization requirement for each unique subsystem under the Precise Time and Time Dissemination Resilience program 2.6) OPEOC - Earth Orientation Compute Resilience USNO (84T): FY27 funds increase ($7.000M) attributed to the planned acquisition of a strong and durable correlator. 2.8) OPPTAN PTA Network (84Z) USNO: FY27 funds increase ($7.014M) due to the distinct lifecycle replacement and equipment modernization needs for every individual subsystem within the Precise Time and Astrometry Network initiative. 2.9) (CTD) Conductivity Temp Depth (CTD) Optics Pinger System LCR NAVO (85B): FY27 funds decrease ($1.706M) due to Life Cycle Replacement for FY26 only. 2.14) (PNN6T) Shallow Water Multibeam NAVO (85B): FY27 funds increase ($2.033M) attributed to life cycle replacement on T-AGS vessels beginning FY27. T-AGS 63 (LCR) - (1) Sub-bottom Profiler; expected delivery FY28 - when ship goes to planned overhaul. Item procured 1 year before ship overhaul for testing, inspection, and must be accepted prior to ship's installation. 2.15) Ship Davits for Hydro Unmanned Surface Vessel (USV) Systems (85B) NAVO: FY27 funds decrease ($1.024M) due to the Unmanned Surface Vehicles (USV) Davit (1 of 6) procurement and installation in FY26 only. Out-year Controls do not support additional procurements. 3.1) (PNN3E) Ship Moving Vessel Profiler (MVP) NAVO (85B): FY27 funds decrease ($1.080M) due to T-AGS Moving Vessel Profiler (MVP) Spare Procurement for (1) MVP Spare System in FY27. 3.3) (HSLUV) (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B): FY27 funds decrease ($5.090M) due to initial Unmanned Surface Vehicle (USV) purchase to install on 1 T-AGS in FY26. 3.5) (POPS OIS) Primary Oceanographic Prediction Sys (POPS)& OIS FNMOC (85H): FY27 funds decrease ($1.019M) due to program reduction. Significant decrease cause operational risk for Joint/Fleet force operational commanders who depend on timely and accurate environmental intelligence to conduct operations. Funding supports the modernization and lifecycle refresh of advanced cybersecurity capabilities required to secure and manage the High-Performance Computing environment, to include the high bandwidth network infrastructure that enables processing and global dissemination of Navy meteorological and oceanographic data. A decrease at this level will delay critical technology refresh and capability upgrades necessary to sustain performance of environmental modeling enterprise, while slowing modernization LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 8 of 22 P-1 Line #138 Volume 5 - 258 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A initiatives aligned with Zero Trust implementation and cybersecurity risk. These delays would increase technical and cyber risk within the operational environment and could degrade the speed, resilience, and reliability of environmental intelligence provided to operational commanders, ultimately diminishing decision advantage in contested maritime operations. 3.11) Mine Warfare (MIW) Autonomous Undersea Vehicles (AUVs) (85M) NAVO: FY27 funds increase ($0.278M) due to procurement supports for the (1) Mine Warfare Autonomous Undersea Vehicles (MIW AUV) Remus 300-600m variant system. Changes in controls arise from differences in the quantity of vehicles and related equipment. There is a cost increase associated with the acquisition of one two-man portable autonomous undersea vehicle (AUV). System 2. The costs for the follow-on year are equivalent to the FY27 cost adjusted for inflation; however, the controls do not facilitate complete procurement. 3.13) (PNN4A) Acoustic Measurement System NAVO (85M): FY27 funds decrease ($0.618M) due to the Lifecycle Replacement potentially planned for FY29; this is not needed every year. 4.8) (PNN6W) Integrated Sub Bottom Profiler NAVO (85B): FY27 funds increase of ($1.500M) due to the life cycle replacement on T-AGS vessel beginning FY27. 4.13) (PNN6M) Deep Multibeam Replacement NAVO (85B): FY27 funds increase ($3.487M) support life cycle replacement in FY27. T-AGS 63 (LCR) - (1) Deep Multibeam; expected delivery FY28 - when ship goes to planned overhaul. Item procured 1 year before ship overhaul for testing, inspection, and must be accepted prior to ship's installation. 6.3) (POPS OIS) Oceanographic Information Ships (OIS) Tech Refresh-NAVO (85H): FY27 funds increase ($0.020M) attributed to inflation. 6.4) (POPS OIS) Oceanographic Ships Virtualization Technology Refresh- NAVO-85H: FY27 funds decrease ($3.017M) due to the Lifecycle Replacement potentially planned for FY30 which is not needed every year. 6.6) (POPS OIS) Virtual Cluster Technology Refresh-NAVO-85H: FY27 funds increase ($2.059M) to supports the installation schedule on T-AGS vessels based on funding and ship availability. Increase in FY27 due to nothing planned for FY26. UFR controls changed for FY26 TO 1.202, OPN 84Z to OMN 84Z execution year swap (84Z USNO is looking at IT as a service). MAND requirement for 5000. Funded amount is 3261.29. Life Cycle Replacement (LCR) of 64 Virtual Host servers to include storage, management servers, cabling, system racks, PDUS, network components for each rack (patch panels, Fabric extenders, UCS managers, etc.). The virtual hosts are across 4 zones (NIPR enclave, SIPR Enclave, NIPR DMZ, and SIPR DMZ) 6.7) (POPS OIS) Life Cycle Replacement Firewall & Cyber Appliances HW-NAVO-85H: FY27 funds increase ($0.727M) due to life cycle replacement. 6.9) (POPS OIS) Domain Management Systems-NAVO-85H: FY27 funds increase ($0.708M) designated for installation purposes. This is part of the Phased Refresh (1 of 6) that includes (1) the POPS-OCN Domain Management Systems and the Disaster Recovery Management Systems (SERVER)-LCRs. The procurement process supports a phased Life Cycle Replacement. 6.10) (POPS OIS) High Performance Computing (HPC) Technology Refresh-NAVO-85H: FY27 funds decrease ($2.409M) will lead to the acquisition of a smaller number of compute nodes, which are part of the cluster. 6.11) (POPS OIS) Data Center Network Switches-Life Cycle Replacement (LCR)-NAVO-85H: FY27 funds increase ($0.627M) Life Cycle Replacement (LCR) of 18 Data Center network switches for the classified and unclassified networks. Increase in FY27 because there was nothing planned for FY26. 6.13) (POPS OIS) Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H: FY27 funds decrease ($0.302M) will result in the funds of fewer survey events. Funds support the Integrated Survey Systems 60 software critical to collecting and integrating oceanographic information in support of surface and subsurface navigation. 6.14) (POPS OIS) Storage Area Network (SAN) LCR-NAVO-85H: FY27 funds increase ($1.214M) due to the supports of Continuous life cycle replacement for the Storage Area Network (SAN) starting in FY27. An increase in funding is projected for FY27 because no requirements were planned for FY26 LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 9 of 22 P-1 Line #138 Volume 5 - 259 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 6.16) Primary Oceanographic Prediction Sys (POPS)&OIS NAVIFOR HQ (85H): FY27 funds decrease ($1.016M) due to the phasing from FY26 in August 2026, which will extend into FY27, leading to this decrease. In FY27, corporate research and development will be conducted for the National Security Agency (NSA) to meet the Raise the Bar (RTB) requirements. Additionally, in FY28, there will be procurement and implementation efforts aimed at transferring gigabyte to terabyte meteorological and oceanographic data sets from unclassified networks to classified networks. 6.17) NOMWC UUV Life-Cycle Replacement NOOC (85M): FY27 funds decreased ($4.000M) due to receiving one-time OPN funds in the previous fiscal year, which were used to procure three Unmanned Underwater Vehicles (UUVs). An ongoing requirement for the Life Cycle Replacement (LCR) of the remaining legacy UUV fleet persists, and funding for this need has been requested through the POM process. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 10 of 22 P-1 Line #138 Volume 5 - 260 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Environmental Support Equipment Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 1) New P40A Grouping 1.1) Acoustic Positioning System (USBL) Ultra Short Base Line NAVO (85B) A 1.2) Master Clock Systems USNO (84T) A 1.3) OPCRFM Celestial Reference Frame Management USNO (84T) A 1.4) P-001 Precise Time and Astrometry Network MILCON A USNO (84T) 0.558 10 5.580 - - - - - - - - - - - - - - - 0.556 14 7.787 - - - - - - - - - - - - - - - 2.068 3 6.204 - - - - - - - - - - - - - - - 1.100 6 6.599 0.607 0.607 - - - - - - - - - - - - 0.607 - - - - - - - - - - - - 4.000 - - - - - - - - - - - - - - - - - - - - - - - - - 1 (†) Subtotal: 1) New P40A Grouping - - 26.170 - - - - - 4.000 9.534 - - 5.500 1 5.500 5.500 1 5.500 4.300 1 4.300 - - - 4.300 1 4.300 7.928 4.407 1 4.407 6.092 1 6.092 3.513 1 3.513 - - - 3.513 1 3.513 7.813 - - - - 2) New P40A Grouping 2.1) OPPMA PTA MISSION APP SYSTEM USNO A 1 (†) (84T) 2.2) OPTSEO Timing, Time Transfer, EOP Delivery USNO (84T) A 2.3) OPVLBA - Very Long Baseline Array Resilience USNO A (84T) 2.384 - 4 - - (1)(†) 2.4) OPPTA - Precise Time and Astrometry USNO (84T) A (2)(†) Subtotal: 2) New P40A Grouping 3.964 2 - - 17.462 - - 13.907 - - 11.592 - - - 7.813 - - - - - - - - - 16.000 1 16.000 - - - 16.000 1 16.000 - - - - - - - - - 7.000 1 7.000 - - - 7.000 1 7.000 3) New P40A Grouping 3.1) OPTTD - Precise Time and Time Dissemination Resilience USNO (84T) (3)(†) 3.2) OPEOC - Earth Orientation Compute Resilience USNO (84T) A A (4)(†) LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 11 of 22 P-1 Line #138 Volume 5 - 261 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.4) OPPTAN PTA Network (84Z) USNO A 3.5) Conductivity Temp Depth (CTD) Optics Pinger System A MAIS Code (5)(†) LCR NAVO (85B) A 3.7) Long Term Ambient Noise Recording/Reporting Sys NAVO (85M) A 3.8) Nav Map Ref Disk and Patrol Analysis System (PBNZ Support)(85M) A - (Each) Unit Cost ($ M) - ($ M) - - Qty (Each) Unit Cost ($ M) - 1 ($ M) - - 0.755 1.706 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - 1 ($ M) - 7.014 1.706 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1 ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 7.014 - - - 7.014 1 7.014 - - - - - - - - 0.682 5 3.410 0.755 0.565 7 3.952 - - - - - - - - - - - - - - - 0.400 1 0.400 0.050 10 0.500 - - - - - - - - - - - - - 0.354 1 0.354 - - - - - - - - - - - - - - - - - - - - 2.033 - - - 2.033 - - (†) 3.9) Portable Multibeam Replacement NAVO (85M) A 3.10) Shallow Water Multibeam NAVO A (85B) ($ M) Qty FY 2026 Total Cost (6)(†) 3.6) Digital Side Scan Sonar (SHIP) NAVO (85B) NAVO Unit Cost FY 2025 Total Cost Aggregated Items Title: Environmental Support Equipment (7)(†) 3.11) Ship Davits for Hydro Unmanned Surface Vessel (USV) Systems (85B) NAVO 0.654 4 2.617 - - - - - - - 1.370 6 8.220 - - - - - - 2.033 1.024 - - - - - - - - - 2.730 - - 32.047 - - - - - 32.047 1.489 0.409 0.409 - - - 0.409 - - - - - - - - - - 5.090 - - - - - - - - - - - - - - - - - - - 1 1 2.033 A - - - - - - 1.024 - - 18.599 - - 1.609 - 1 (8)(†) Subtotal: 3) New P40A Grouping - 4) New P40A Grouping 4.1) Ship Moving Vessel Profiler (MVP) NAVO (85B) A (9)(†) 4.2) Ship To Shore Data Comm NAVO A (†) (85B) 4.3) (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B) 0.601 7 4.209 0.538 2 1.076 1.489 1.323 2 2.645 0.655 1 0.655 - 2.042 2 4.084 5.218 1 5.218 5.090 2.000 1 2.000 - - - 1 - 1 1 0.409 A 1 (10)(†) 4.4) Network Connection for NextGen Environmental A LI 8126 - Environmental Support Equipment Navy - - UNCLASSIFIED Page 12 of 22 P-1 Line #138 Volume 5 - 262 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.5) Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC A Prediction FNMOC (85E) (85H) MAIS Code Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) 19.990 2 39.980 3.475 0.383 5 1.917 - 0.870 1 0.870 0.250 2 1.500 1 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 1 ($ M) 3.475 4.518 - - - - - - 0.500 - - 1.500 - - FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Environmental Support Equipment Unit Cost ($ M) 1 ($ M) 4.518 3.499 - - - - - - - - - - - - - - - - 1.802 2.468 - - - 0.618 60.173 - - 10.424 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1 ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 3.499 - - - 3.499 1 3.499 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1.802 2.080 2.080 - - - 2.080 1 0.618 - - - - - - - - - - 13.517 - - 5.988 - - - - - 5.988 (11)(†) 4.7) European Deterrence Initiative NAVO (85M) A 4.8) Fleet Survey Team (FST) Integrated Survey Platform NAVO (85M) A 4.9) Fleet Survey Team (FST) Unmanned Surface Vehicles NAVO (85M) A 4.10) Long Term Ambient Noise Recording/Reporting Sys (85M) A 4.11) Mine Warfare (MIW) Autonomous Undersea Vehicles (AUVs) (85M) NAVO A 4.13) Acoustic Measurement System A - - 1 1 2.080 (12)(†) NAVO (85M) (13)(†) Subtotal: 4) New P40A Grouping 0.494 - 5 - 5) New P40A Grouping 5.1) Ship Submersible Ballistic (Nuclear) (SSBN) Support NAVO (85M)) A 0.426 2 0.851 - - - - - - - - - - - - - - - 0.370 1 0.370 - - - - - - - - - - - - - - - 6.000 1 6.000 - - - - - - - - - - - - - - - 0.847 9 7.627 - - - - - - - - - - - - - - - (†) 5.2) Signal Underwater Sound (SUS) CONTAINER (85M) A 5.3) (MACOS) Unmanned Hydrographic UUV NAVO (85M) A 5.4) Time Distribution System USNO (85T) A LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 13 of 22 P-1 Line #138 Volume 5 - 263 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.5) Advanced Weather Interactive Processing System (AWIPS) A 5.6) OIS Architecture 5.7) POPS 5.8) Integrated Sub Bottom Profiler NAVO A (85B) Code Unit Cost ($ M) Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 1.229 1 1.229 - - - - - - - - - - - - - - - A 1.554 7 10.876 - - - - - - - - - - - - - - - A 2.313 8 18.506 - - - - - - - - - - - - - - - 0.622 7 4.351 - - - - - - 1.500 1.500 - - - 1.500 0.350 2 0.700 - - - - - - - - - - - - - - - 3.285 7 22.998 - - - - - - - - - - - - - - - 2.240 2 4.480 - - - - - - - - - - - - - - - 1.844 3 5.532 - - - - - - - - - - - - - - - 3.419 6 20.513 - - - - - - 3.487 3.487 - - - 3.487 0.685 6 4.109 - - - - - - - - - - - - - - - 0.834 1 0.834 - - - - - - - - - - - - - - - (14) 5.9) Rigid Hull Inflatable Boats Global Mine A 5.10) POPS-MET Enhancements A 5.11) POPS Enhancements A 5.12) Airborne Lidar System NAVO (85M) A 5.13) Deep Multibeam Replacement NAVO A (85B) MAIS FY 2025 Total Cost Aggregated Items Title: Environmental Support Equipment (15)(†) 5.14) Very Long Baseline Interferometry A 5.15) Near Real-Time Profiling Arrays A 5.16) Navy Precision Optical Interferometer A 1.013 Subtotal: 5) New P40A Grouping - 3 - 1 1 1 1 1.500 3.487 3.039 - - - - - - - - - - - - - - - 112.015 - - - - - - - - 4.987 - - - - - 4.987 6) New P40A Grouping 6.1) Task Force Cyber Awakening (TFCA) - U.S. Naval Observatory A 6.2) Shallow Water Seismic System NAVO (85M) A 6.068 1 6.068 - - - - - - - - - - - - - - - 0.382 5 1.909 - - - - - - - - - - - - - - - 7.977 - - - - - - - - - - - - - - - 34.223 8.782 8.782 - - - - - - - - - - - - 34.937 - - - - - - - - - - - - - - Subtotal: 6) New P40A Grouping - - 7) NAVWAR Environmental Support Equipment 7.1) Precise Time and Astrometry Network (PTA Network) USNO 84T A 4.278 8 1 (†) 7.2) Primary Oceanographic A - - LI 8126 - Environmental Support Equipment Navy - UNCLASSIFIED Page 14 of 22 P-1 Line #138 Volume 5 - 264 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 7.3) Oceanographic Information Ships (OIS) Tech Refresh- A Prediction Sys (POPS) & Oceanogr. Info Sys (OIS) NAVO (85H) ($ M) Qty (Each) Unit Cost ($ M) ($ M) - - - 0.750 - - - - - - - 0.824 - - - - - - - 0.557 - - - - - - - 1.852 - - - - - - - 1.580 - - - 4.848 9.151 - Qty (Each) Unit Cost ($ M) 1 ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) 0.750 0.800 1 0.800 0.820 - 3.017 1 3.017 - 1.648 1.202 1 1.202 3.261 - - - - 0.727 0.557 - - - - - - - - 0.708 1.852 2.909 2.909 - - 1 1.580 2.077 1 4.848 0.000 - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1 ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 0.820 - - - 0.820 1 0.820 - - - - - 1 3.261 - - - 3.261 1 3.261 1 0.727 - - - 0.727 1 0.727 - - - - - 1 0.708 - - - 0.708 1 0.708 0.500 1 0.500 - - - 0.500 1 0.500 - 0.627 1 0.627 - - - 0.627 1 0.627 1 2.077 1.775 1 1.775 - - - 1.775 1 1.775 1 0.000 1.214 1 1.214 - - - 1.214 1 1.214 - - - - - - - A - - - - (17)(†) 7.6) Virtual Cluster Technology RefreshNAVO-85H Code Unit Cost FY 2026 Total Cost (16)(†) 7.4) Oceanographic Ships Virtualization Technology RefreshNAVO-85H MAIS FY 2025 Total Cost Aggregated Items Title: Environmental Support Equipment A (18)(†) 7.7) Life Cycle Replacement Firewall & Cyber Appliances HW-NAVO-85H 2 A - (19)(†) 7.8) Life Cycle Replacement (LCR) Ship-to-Shore (S2S) Network HW- A 1 - - - (†) NAVO-85H 7.9) Domain Management Systems-NAVO-85H A 7.10) High Performance Computing (HPC) Technology Refresh- A - (20)(†) NAVO-85H 1 1 (21)(†) 7.11) Data Center Network Switches-Life Cycle Replacement (LCR)-NAVO-85H A 7.13) Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H A 7.14) Storage Area Network (SAN) LCR- A - - (22)(†) (23)(†) NAVO-85H (24)(†) 7.15) MILCON P-001 Precise Time and A 1.830 5 LI 8126 - Environmental Support Equipment Navy - - UNCLASSIFIED Page 15 of 22 - P-1 Line #138 - - Volume 5 - 265 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] Astrometry Network ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Environmental Support Equipment ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) (†) (PTA Network) 7.16) Primary Oceanographic Prediction Sys (POPS)&OIS NAVIFOR HQ (85H) A 7.17) NOMWC UUV Life-Cycle Replacement NOOC A - - - 0.935 - - - - Subtotal: 7) NAVWAR Environmental Support Equipment - - 78.311 Total - - 320.707 1 0.935 1.016 1 1.016 - - - - - - - - - - - 4.000 1 4.000 - - - - - - - - - - - 20.952 - - 15.021 - - 9.632 - - - - - 9.632 - - 47.499 - - 42.860 - - 60.467 - - - - - 60.467 (25)(†) (85M) (26)(†) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) Decrease ($1.200M) results from the programmed reduction in Very Long Baseline Array VLBA subsystem procurements. Decrease ($2.579M) results from the unique lifecycle replacement and equipment modernization requirement for each unique subsystem under the Precise Time and Astrometry program. Increase ($16.000M) results from the unique equipment modernization requirement for each unique subsystem under the Precise Time and Time Dissemination Resilience program Increase ($7.000M) results from the planned procurement of a robust and resilient correlator. Increase ($7.014M) due to the distinct lifecycle replacement and equipment modernization needs for every individual subsystem within the Precise Time and Astrometry Network initiative. Decrease ($1.706M) due to Life Cycle Replacement for FY26 only. Increase ($2.033M) attributed to life cycle replacement on T-AGS vessels beginning FY27. T-AGS 63 (LCR) - (1) Sub-bottom Profiler; expected delivery FY28 - when ship goes to planned overhaul. Item procured 1 year before ship overhaul for testing, inspection, and must be accepted prior to ship's installation. (8) (9) Decrease ($1.024M) due to the Unmanned Surface Vehicles (USV) Davit (1 of 6) procurement and installation in FY26 only. Out-year Controls do not support additional procurements. UFR Control increase in year of execution (FY26). Currently working on plan of execution, hence the decrease ($1.080M) for FY27. T-AGS Moving Vessel Profiler (MVP) Spare Procurement for (1) MVP Spare System in FY27. (10) (11) Decrease of ($5.090M) due to initial Unmanned Surface Vehicle (USV) purchase to install on 1 T-AGS in FY26. Decreased ($1.019M) funding increases operational risk for Joint/Fleet force operational commanders who depend on timely and accurate environmental intelligence to conduct operations. Funding supports the modernization and lifecycle refresh of advanced cybersecurity capabilities required to secure and manage the High-Performance Computing environment, to include the high bandwidth network infrastructure that enables processing and global dissemination of Navy meteorological and oceanographic data. A decrease at this level will delay critical technology refresh and capability upgrades necessary to sustain performance of environmental modeling enterprise, while slowing modernization initiatives aligned with Zero Trust implementation and cybersecurity risk. These delays would increase technical and cyber risk within the operational environment and could degrade the speed, resilience, and reliability of environmental intelligence provided to operational commanders, ultimately diminishing decision advantage in contested maritime operations. The decrease in funding from FY26 to FY27 is due to a smaller increase in issue 16183 in FY27 for $700K as compared to the increase in FY26 for $1,500K, a difference of $800K. The combination of the additional cuts taken in FY27 for -$189K due to issues 54351, 72816, and 72937 with the smaller increase in FY27 explains why there was a decrease. (12) Increase ($0.278M) due to procurement for (1) Mine Warfare Autonomous Undersea Vehicles (MIW AUV) Remus 300-600m variant system. Controls change due to vehicles and associated equipment quantity differences. Cost increase for purchase of one two man-portable autonomous undersea vehicles (AUV). System 2. Follow-on year costs equal FY27 cost plus inflation, but controls do not support full procurement. (13) (14) Decrease ($0.618M) due to the Lifecycle Replacement potentially planned for FY29; this is not needed every year. FY27 increase of ($1.500M) attributed to life cycle replacement on T-AGS vessel beginning FY27. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 16 of 22 P-1 Line #138 Volume 5 - 266 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Aggregated Items Title: Environmental Support Equipment (15) Increase ($3.487M) support life cycle replacement in FY27. T-AGS 63 (LCR) - (1) Deep Multibeam; expected delivery FY28 - when ship goes to planned overhaul. Item procured 1 year before ship overhaul for testing, inspection, and must be accepted prior to ship's installation. (16) (17) (18) Increase ($0.020M) attributed to inflation. FY27 funds decrease ($3.017M) due to the Lifecycle Replacement potentially planned for FY30; this is not needed every year. Increase ($2.059M) supports installation schedule on T-AGS vessels based on funding and ship availability. Increase in FY27 due to nothing planned for FY26. UFR controls changed for FY26 TO 1.202, OPN 84Z to OMN 84Z execution year swap (84Z USNO is looking at IT as a service). MAND requirement for 5000. Funded amount is 3261.29. Life Cycle Replacement (LCR) of 64 Virtual Host servers to include storage, management servers, cabling, system racks, PDUS, network components for each rack (patch panels, Fabric extenders, UCS managers, etc.). The virtual hosts are across 4 zones (NIPR enclave, SIPR Enclave, NIPR DMZ, and SIPR DMZ) (19) (20) Increase ($.0727M) due to life cycle replacement. Funding breakout based on what is being bought moving funds from cost element 2.13. 85H prior years-Line items were not broken down in previous years. Increase ($0.708M) intends to be executed for installation. Phased Refresh (1 of 6) (1) POPS-OCN Domain Management Systems and Disaster Recovery Management Systems (SERVER)-LCRs. Procurement facilitates a phased Life Cycle Replacement. (21) (22) Decrease ($2.409M) will lead to the acquisition of a smaller number of compute nodes, which are part of the cluster. Funding breaks out based on what is being bought moving funds from cost element 2.13. 85H prior years-Line items were not broken down in previous years. One time increase ($0.627M) Life Cycle Replacement (LCR) of 18 Data Center network switches for the classified and unclassified networks. Increase in FY27 because there was nothing planned for FY26. (23) (24) (25) Decrease ($0.302M) will result in the funds of fewer survey events. Funds support the Integrated Survey Systems 60 software critical to collecting and integrating oceanographic information in support of surface and subsurface navigation. Increase ($1.214M) due to the supports of Continuous life cycle replacement for the Storage Area Network (SAN) starting in FY27. An increase in funding is projected for FY27 because no requirements were planned for FY26 Decrease ($1.016M) due to the phasing from FY26 in August 2026, which will extend into FY27, leading to this decrease. In FY27, corporate research and development will be conducted for the National Security Agency (NSA) to meet the Raise the Bar (RTB) requirements. Additionally, in FY28, there will be procurement and implementation efforts aimed at transferring gigabyte to terabyte meteorological and oceanographic data sets from unclassified networks to classified networks. (26) FY27 funds decreased ($4.000M) due to receiving one-time OPN funds in the previous fiscal year, which were used to procure three Unmanned Underwater Vehicles (UUVs). An ongoing requirement for the Life Cycle Replacement (LCR) of the remaining legacy UUV fleet persists, and funding for this need has been requested through the POM process. LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 17 of 22 P-1 Line #138 Volume 5 - 267 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Environmental Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.4) P-001 Precise Time and Astrometry Network MILCON USNO (84T) 2024 NAVSUP / Norfolk C / FFP Norfolk, VA Apr 2024 Oct 2024 1 0.608 N Aug 2026 1.4) P-001 Precise Time and Astrometry Network MILCON USNO (84T) 2025 NAVSUP / Norfolk C / FFP Norfolk, VA Apr 2025 Oct 2025 1 0.607 N Aug 2027 2025 NAVSUP / Norfolk C / FFP Norfolk, VA Mar 2025 Mar 2025 1 4.000 N Aug 2026 2025 National Science Foundation / Alexandria, VA C / FFP Alexandria, VA Mar 2025 Mar 2025 1 5.500 N Aug 2027 2026 National Science Foundation / Alexandria, VA C / FFP Alexandria, VA Mar 2026 Mar 2026 1 5.500 N Aug 2028 2027 National Science Foundation / Alexandria, VA C / FFP Alexandria, VA Mar 2027 Mar 2027 1 4.300 N Aug 2030 2024 NAVSUP / Norfolk C / FFP Norfolk, VA Mar 2024 Mar 2024 1 4.315 N Aug 2026 2025 NAVSUP / Norfolk C / FFP Norfolk, VA Mar 2025 Mar 2025 1 4.407 N Aug 2027 2026 NAVSUP / Norfolk C / FFP Norfolk, VA Mar 2026 Mar 2026 1 6.092 N Aug 2028 2027 FLC / FLC Philadelphia C / FFP Norfolk, VA Mar 2027 Mar 2027 1 3.513 N Aug 2029 2027 FLC, Norfolk / Norfolk, VA C / FFP Norfolk, VA Mar 2027 Mar 2027 1 16.000 N Aug 2028 2027 FLC, Norfolk / Norfolk, VA C / FFP Norfolk, VA Mar 2027 Mar 2027 1 7.000 N Aug 2028 2027 NAVSUP / Norfolk C / FFP Norfolk, VA Mar 2027 Mar 2027 1 7.014 N May 2029 2024 DLA Troop Support / Philadelphia, PA C / FFP Philadelphia, PA Apr 2024 Oct 2024 1 0.721 N Feb 2024 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date 1) New P40A Grouping 2) New P40A Grouping 2.1) OPPMA PTA MISSION APP SYSTEM USNO (84T) 2.3) OPVLBA - Very Long Baseline Array Resilience USNO (84T) (1) 2.3) OPVLBA - Very Long Baseline Array Resilience USNO (84T) (1) 2.3) OPVLBA - Very Long Baseline Array Resilience USNO (84T) (1) 2.4) OPPTA - Precise Time and Astrometry USNO (84T) (2) 2.4) OPPTA - Precise Time and Astrometry USNO (84T) (2) 2.4) OPPTA - Precise Time and Astrometry USNO (84T) (2) 2.4) OPPTA - Precise Time and Astrometry USNO (84T) (2) 3) New P40A Grouping 3.1) OPTTD - Precise Time and Time Dissemination Resilience USNO (84T) (3) 3.2) OPEOC - Earth Orientation Compute Resilience USNO (84T) (4) 3.4) OPPTAN PTA Network (84Z) USNO (5) 3.5) Conductivity Temp Depth (CTD) Optics Pinger System LCR NAVO (85B) (6) LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 18 of 22 P-1 Line #138 Volume 5 - 268 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Environmental Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 DLA Troop Support / Philadelphia, PA C / FFP Philadelphia, PA Oct 2024 Apr 2025 1 0.755 N Feb 2025 2026 DLA Troop Support / Philadelphia, PA C / FFP Philadelphia, PA Oct 2025 Apr 2026 1 1.706 N Feb 2026 2025 NAVSUP / PHILADELPHIA, PA C / FFP Philadelphia, PA Jul 2025 Jul 2025 1 0.354 N Jul 2025 2027 VARIOIUS / NAVO C / FFP Norfolk, VA Oct 2026 Oct 2026 1 2.033 N Sep 2027 2026 VARIOIUS / NAVO Various Philadelphia, PA Jan 2026 Jan 2026 1 1.024 N Jan 2026 2024 DLA Troop Support / Philadelphia, PA C / FP Philadelphia, PA Mar 2024 Sep 2024 1 0.601 N Feb 2024 Mar 2024 2025 DLA Troop Support / Philadelphia, PA C / FFP Philadelphia, PA Oct 2024 Apr 2025 2 0.538 N Feb 2025 Oct 2024 2026 DLA Troop Support / Philadelphia, PA C / FFP Philadelphia, PA Oct 2025 Oct 2025 1 1.489 N Feb 2026 Oct 2025 4.2) Ship To Shore Data Comm NAVO (85B) 2024 DLA Troop Support / Philadelphia, PA C / FFP NAVO Mar 2024 Sep 2024 1 1.293 N Feb 2024 4.2) Ship To Shore Data Comm NAVO (85B) 2025 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2024 Oct 2024 1 0.655 N Feb 2025 2024 DLA Troop Support / Philadelphia, PA C / FP DLA Mar 2024 Sep 2024 1 2.168 N Feb 2024 2025 DLA Troop Support / Philadelphia, PA C / FFP DLA Oct 2024 Oct 2024 1 5.218 N Feb 2025 2026 DLA Troop Support / Philadelphia, PA C / FFP DLA Oct 2025 Oct 2025 1 5.090 N Feb 2026 2024 VARIOUS / FNMOC C / FFP Defense Logisitcs Agency (DLA) Troop Support Apr 2024 Oct 2024 1 10.900 N Feb 2024 Item Number / Title [DODIC] 3.5) Conductivity Temp Depth (CTD) Optics Pinger System LCR NAVO (85B) (6) 3.5) Conductivity Temp Depth (CTD) Optics Pinger System LCR NAVO (85B) (6) 3.8) Nav Map Ref Disk and Patrol Analysis System (PBNZ Support) (85M) NAVO 3.10) Shallow Water Multibeam NAVO (85B) (7) 3.11) Ship Davits for Hydro Unmanned Surface Vessel (USV) Systems (85B) NAVO (8) O O C P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date 4) New P40A Grouping 4.1) Ship Moving Vessel Profiler (MVP) NAVO (85B) (9) 4.1) Ship Moving Vessel Profiler (MVP) NAVO (85B) (9) 4.1) Ship Moving Vessel Profiler (MVP) NAVO (85B) (9) 4.3) (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B) (10) 4.3) (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B) (10) 4.3) (USV) T-AGS Hydrographic Survey Launch, USV Replace NAVO (85B) (10) 4.5) Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC (85H) (11) LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 19 of 22 P-1 Line #138 Feb 2024 Volume 5 - 269 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 4.5) Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC (85H) (11) 4.5) Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC (85H) (11) 4.5) Primary Oceanographic Prediction Sys (POPS)&OIS FNMOC (85H) (11) 4.11) Mine Warfare (MIW) Autonomous Undersea Vehicles (AUVs) (85M) NAVO (12) 4.13) Acoustic Measurement System NAVO (85M) (13) O O C P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Aggregated Items: Environmental Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 VARIOUS / FNMOC C / FFP Defense Logisitcs Agency (DLA) Troop Support Mar 2025 Sep 2025 1 3.475 N Feb 2025 Feb 2025 2026 VARIOUS / FNMOC C / FFP Defense Logisitcs Agency (DLA) Troop Support Mar 2026 Aug 2026 1 4.518 N Feb 2026 Feb 2026 2027 VARIOUS / FNMOC C / FFP Defense Logisitcs Agency (DLA) Troop Support Mar 2027 Aug 2027 1 3.499 N Feb 2027 Feb 2027 2026 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2025 Oct 2025 1 1.802 N Feb 2025 Feb 2025 2026 NAVSUP FLC / PHILADELPHIA, PA C / FFP NAVSUP FLC Oct 2025 Oct 2025 1 0.618 N Feb 2026 2024 NAVSUP FLC / PHILADELPHIA, PA C / IDIQ NAVSUP FLC Mar 2024 Sep 2024 1 0.451 N Feb 2024 2027 VARIOIUS / NAVO Various Norfolk, VA Oct 2026 Oct 2026 1 3.487 N Sep 2027 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date 5) New P40A Grouping 5.1) Ship Submersible Ballistic (Nuclear) (SSBN) Support NAVO (85M)) 5.13) Deep Multibeam Replacement NAVO (85B) (15) 7) NAVWAR Environmental Support Equipment 7.1) Precise Time and Astrometry Network (PTA Network) USNO 84T 2024 NIWC LANT / Charleston, SC WR NIWC LANT Nov 2023 Jan 2024 1 16.886 Y 7.1) Precise Time and Astrometry Network (PTA Network) USNO 84T 2025 NIWC LANT / Charleston, SC WR NIWC LANT Nov 2024 Jan 2025 1 8.782 Y 2025 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2024 Oct 2024 1 0.750 N Oct 2024 2026 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2025 Oct 2025 1 0.800 N Oct 2025 2027 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2026 Oct 2026 1 0.820 N Oct 2026 2026 VARIOIUS / NAVO C / IDIQ Norfolk, VA Oct 2025 Oct 2025 1 3.017 N Sep 2026 7.3) Oceanographic Information Ships (OIS) Tech Refresh-NAVO (85H) (16) 7.3) Oceanographic Information Ships (OIS) Tech Refresh-NAVO (85H) (16) 7.3) Oceanographic Information Ships (OIS) Tech Refresh-NAVO (85H) (16) 7.4) Oceanographic Ships Virtualization Technology RefreshNAVO-85H (17) LI 8126 - Environmental Support Equipment Navy UNCLASSIFIED Page 20 of 22 P-1 Line #138 Volume 5 - 270 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 7.6) Virtual Cluster Technology Refresh-NAVO-85H (18) 7.6) Virtual Cluster Technology Refresh-NAVO-85H (18) 7.6) Virtual Cluster Technology Refresh-NAVO-85H (18) 7.7) Life Cycle Replacement Firewall & Cyber Appliances HWNAVO-85H (19) 7.8) Life Cycle Replacement (LCR) Ship-to-Shore (S2S) Network HWNAVO-85H 7.9) Domain Management Systems-NAVO-85H (20) 7.10) High Performance Computing (HPC) Technology RefreshNAVO-85H (21) 7.10) High Performance Computing (HPC) Technology RefreshNAVO-85H (21) 7.10) High Performance Computing (HPC) Technology RefreshNAVO-85H (21) 7.11) Data Center Network Switches-Life Cycle Replacement (LCR)-NAVO-85H (22) 7.13) Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H (23) 7.13) Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H (23) 7.13) Integrated Survey Systems-60 Software Maintenance (OIS)-NAVO-85H (23) 7.14) Storage Area Network (SAN) LCR-NAVO-85H (24) O O C P-1 Line Item Number / Title: 8126 / Environmental Support Equipment Aggregated Items: Environmental Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 VARIOIUS / NAVO Various Norfolk Oct 2024 Oct 2024 2 0.824 N Oct 2025 2026 VARIOIUS / NAVO Various Norfolk, VA Oct 2025 Oct 2025 1 1.202 N Oct 2026 2027 VARIOIUS / NAVO Various Norfolk, VA Oct 2026 Oct 2026 1 3.261 N Oct 2027 2027 VARIOIUS / NAVO Various Stennis Space Center, MS Oct 2026 Oct 2026 1 0.727 N Sep 2027 2025 DLA Troop Support / Philadelphia, PA C / FFP DLA Oct 2024 Oct 2024 1 0.557 N Oct 2025 2027 VARIOIUS / NAVO Various Stennis Space Center, MS Oct 2026 Oct 2026 1 0.708 N Sep 2027 2025 NAVSUP FLC / PHILADELPHIA, PA C / IDIQ NAVSUP FLC Oct 2024 Oct 2024 1 1.852 N Oct 2024 2026 NAVSUP FLC / PHILADELPHIA, PA Various NAVSUP FLC Oct 2025 Oct 2025 1 2.909 N Aug 2026 2027 NAVSUP FLC / PHILADELPHIA, PA TBD NAVSUP FLC Oct 2026 Oct 2026 1 0.500 N Aug 2027 2027 NAVO / Stennis Space Center, MS Various Stennis Space Center, MS Oct 2026 Oct 2026 1 0.627 N Sep 2027 2025 NAVSUP FLC / PHILADELPHIA, PA C / IDIQ NAVSUP FLC Oct 2024 Oct 2024 1 1.580 N Oct 2025 2026 NAVSUP FLC / PHILADELPHIA, PA C / IDIQ NAVSUP FLC Oct 2025 Oct 2025 1 2.077 N Oct 2026 2027 NAVSUP FLC / PHILADELPHIA, PA C / TBD NAVSUP FLC Oct 2026 Oct 2026 1 1.775 N Oct 2027 2025 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2024 Oct 2024 1 4.848 N LI 8126 - Environmental Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 21 of 22 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) P-1 Line #138 RFP Issue Date Volume 5 - 271 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Environmental Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 2026 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2025 Oct 2025 1 0.000 N (24) 2027 DLA Troop Support / Philadelphia, PA C / FFP NAVO Oct 2026 Oct 2026 1 1.214 N 7.15) MILCON P-001 Precise Time and Astrometry Network (PTA Network) 2024 NIWC LANT / Charleston, SC C / IDIQ Charleston, SC Nov 2023 Jan 2024 1 1.045 Y 2025 Everfox / Herndon, VA Various Mechancisburg Oct 2024 Oct 2024 1 0.935 N Oct 2026 2026 Everfox / Herndon, VA Various Mechancisburg Oct 2025 Oct 2025 1 1.016 N Oct 2027 2026 HII Unmanned Systems Inc / Newport News, VA MIPR Philadelphia, PA Jun 2026 Jun 2026 1 4.000 N Jun 2026 Item Number / Title [DODIC] 7.14) Storage Area Network (SAN) LCR-NAVO-85H (24) 7.14) Storage Area Network (SAN) LCR-NAVO-85H 7.16) Primary Oceanographic Prediction Sys (POPS)&OIS NAVIFOR HQ (85H) (25) 7.16) Primary Oceanographic Prediction Sys (POPS)&OIS NAVIFOR HQ (85H) (25) 7.17) NOMWC UUV Life-Cycle Replacement NOOC (85M) (26) O O C P-1 Line Item Number / Title: 8126 / Environmental Support Equipment LI 8126 - Environmental Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 22 of 22 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) P-1 Line #138 RFP Issue Date Volume 5 - 272 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,775.211 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,775.211 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,775.211 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 138.799 138.799 138.799 166.577 166.577 166.577 218.037 0.000 - - 218.037 0.000 - - 218.037 0.000 218.037 218.037 218.037 220.071 220.071 220.071 185.231 185.231 185.231 177.232 177.232 177.232 To FY 2031 Complete 178.070 Continuing 178.070 Total - Continuing Continuing - Continuing - - Continuing Continuing 1.106 Continuing Continuing 178.070 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.179 - 0.002 - 0.002 0.514 0.566 1.194 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line item procures equipment to support the security and safety for the Department's assets worldwide. Physical Security/Access Control (PS/AC) supports the mission to deter, detect and defeat threats at the outermost perimeter, protecting air assets and high value units. Access control points systems are critical to providing Force Protection at the Navy's Continental United States (CONUS) installations. Effective and reliable barriers are the best system for keeping unauthorized vehicles and personnel from entering the base. P40A / Visual Augmentation Systems (VAS): The United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoW VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Other Procurement, Navy funding provides the United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record with funding to procure new and replacement night vision equipment, thermal detection equipment, day/night optics and associated test equipment for ships, submarines, carriers, expeditionary forces and shore installations so that commanders can maintain situational awareness in degraded visual environments while maintaining the greatest possible distance from threats. Counter small Unmanned Aerial Systems (C-sUAS) Family of Systems (FoS) program was funded to provide initial material solutions to SECNAV-prioritized locations CONUS and Outside the Continental United States (OCONUS) with baseline electronic warfare (EW) capabilities to detect, track, identify, and defeat Unmanned Aerial Systems (UAS) over a large coverage area. Following initial material deployment, the program continues to expand the capabilities of select, high priority systems and adapt new solutions to defeat evolving threats. The initial material solution included Counter-Remote Control Model Aircraft (RCMA) Integrated Air Defense Network (CORIAN), Ninja, DroneDefender, and DroneBuster. Expanded solutions include Electro Optical/ Infrared (EO/IR), radar, Command and Control (C2), new EW detect/ defeat capabilities, alternative sensors, and additional kinetic and non-kinetic mitigations needed to prepare, maintain, and upkeep force protection, self-defense and operational capabilities against the everevolving UAS threat. Funding is provided to protect high-value and/or critical Navy assets and support public safety against threats by inadvertent or unlawful misuse of UAS. [P40A / SSBN WATERFRONT RESTRICTED AREA SECURITY (WRAS)]: Funding provides for the security equipment required to guard and protect the TRIDENT II (D5) missile while the missile is in storage, being handled, or in a movement convoy to and from the waterfront at the Strategic Weapons Facility, Atlantic (SWFLANT) in Kings Bay (KB), GA and the Strategic Weapons Facility, Pacific (SWFPAC) in LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 1 of 24 P-1 Line #139 Volume 5 - 273 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Bangor, WA. Funding supports the Waterfront Restricted Area and Limited Area (LA) Electronic Security Systems (ESS) installations and refreshes, Vehicle Barriers, the Command, Control, Communication, Computers, and Intelligence (C4I) system that provides security system, communication network, computers, security force command and control function as well as the Water Detection System and other equipment necessary to meet Nuclear Security requirements. Funding further supports the Sense and Interdict (SENSEI) system, the Counter Un-crewed Aircraft System (C-UAS) System of Systems fielded at the Strategic Weapons Facilities for protection of the Limited Area (LA) and Waterfront Restricted Area (WRA) Nuclear Weapon environments against the UAS threat. [P40A / VISUAL AUGMENTATION SYSTEMS (VAS)]: The United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoW VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Funding is provided to procure new and replacement night vision equipment, thermal detection equipment, day/night optics and associated test equipment for ships, submarines, carriers, expeditionary forces and shore installations so that commanders can maintain situational awareness in degraded visual environments while maintaining the greatest possible distance from threats. [P40A / Night Vision, Individual (AN/PVS-31B)]: Funds provided for binocular night vision devices to support low-/no-light naval operations. [P40A / NVD Helmet Mount]: Funds provided for mounting devices to attach the binocular night vision devices to the helmet. [P40A / TAC]: Funds provided for Transportation Account Code (TAC) to support shipment OEM to/from depot. [P40A / ANTI-TERRORISM AFLOAT (ATA) EQUIPAGE]: Anti-Terrorism/Force Protection (ATFP) Physical Security Equipment (PSE) material is a compilation of specific security and AT related items aligned with Chief of Naval Operations (CNO's) objective for operation of watch standers pier side, at perimeter posts, and underway to assist shipboard security forces in thwarting potential terrorist attacks. Visit Boarding Search and Seizure (VBSS) material enables surface forces to reach full Maritime Interception Operations (MIO) capability including interception, boarding, searching, diverting and /or seizing suspect vessels. [P40A / Next Generation Maritime Security Helmet (Enhanced Combat Helmet)]: Funding supports Next Generation Maritime Security Helmets which provide comprehensive ballistic protection to increase survivability during shipboard ATFP, exposed battle station, and VBSS missions. Helmet quantity also decreased to enable shortened replacement interval for armor due to accelerated deterioration of vests/ plates versus helmets. Helmet service life deemed to be twice that of armor based on actual material condition of equipment after four years of use. [P40A / Maritime Armor System]: Funding supports Maritime Armor Systems (MAS) and Naval Security Forces (NSF) Tactical Vests which provide comprehensive ballistic protection to increase survivability during shipboard ATFP, exposed battle station, and VBSS missions. Increasing quantities are required for the increased replacement interval of armor due to accelerated deterioration of vests/plates versus helmets. [P40A / Maritime Buoyant Plates]: Funding supports Maritime Buoyant Plates (MBP) which provide comprehensive ballistic protection to increase survivability of sailors during shipboard ATFP, exposed battle station, and VBSS missions. [P40A / Enhanced Small Arms Protective Inserts]: Funds provided for Enhanced Small Arms Protective Inserts that provide protection against high intensity rifle threats. [P40A / Production Engineering]: Funding provided for biometrics capability to the Fleet surface ships for Visit, Board, Search and Seizure (VBSS) Enhanced Maritime Interception Operations (EMIO) by providing Maritime Domain Awareness (MDA) capability to download fused terrorism intelligence. Funding procures software licenses necessary to maintain software and cybersecurity posture for the systems. [P40A / Biometrically Enabled Access Control - Husbanding (BEACH)]: Funding supports baseline production and production engineering support for the Biometrically Enabled Access Control - Husbanding (BEACH). BEACH is a two-factor authentication capability to improve identity and authentication assurance for entrance to CONUS and OCONUS Navy-Controlled and non-Navy-Controlled ports. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 2 of 24 P-1 Line #139 Volume 5 - 274 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / NAVY NON-LETHAL EFFECTS (NNLE)]: Navy Non-Lethal Effects (NNLE) is a Family of Systems (FoS) used to determine the hostile intent of vessels approaching High Value Assets or secure areas. There are three (3) systems in the FoS: Acoustic Hailing Device (AHD), used to verbally/audibly hail approaching vessels using a Commercial-Off-The-Shelf product; Long Range Ocular Interrupter (LROI), a non-lethal laser dazzler used to hail/warn/suppress approaching vessels; and Maritime Vessel Stopping (MVS), a pneumatic launchable material that blocks the approaching vessel's prop to significantly reduce speed. The LROI-Combined Ocular Interrupter Laser (COIL) procurement will be fielded to replace the currently fielded obsolete device and provide significantly enhanced and governmentally developed capability that will extend the range and increase the usage of the capability into the daylight hours. [P40A / NAVAL SPECIAL WARFARE]: Naval Special Warfare (NSW) service-common funding provides mission critical equipment to U.S. Navy SEAL combat operations in forward deployed contingency locations. These investments for visual augmentation systems include but are not limited to weapon laser range finders, optics and illuminators. This funding also supports the latest EO/IR sensors and night vision goggles for NSW personnel. This material supports NSW core mission requirements and is essential to the readiness and battlefield effectiveness of NSW in winning the current fight against global terrorist organizations as well as near-peer competitors. [P40A / TAC]: Funds provided for Transportation Account Code (TAC) to support shipment OEM to/from depot. [P40A / Aimpoint FCS13 (M3E1)]: Funds provided for fire control systems for the Multi-Role Anti-Armor Anti-Personnel Weapon Systems. [P40A / Public Safety Systems; formerly ANTI-TERRORISM FORCE PROTECTION ASHORE]: Funding provides centrally procured equipment to improve the physical security posture of Navy installations worldwide. The program applies the Commander Navy Installations Command (CNIC) Risk-based investment strategy, ensuring appropriate Anti-Terrorism and Force Protection (ATFP) solutions are fielded. The Physical Security Equipment (PSE) program procures equipment that supports and improves capabilities to detect, defer, and defeat terrorist and criminal activity targeted against Navy personnel, government property and facilities ashore/afloat. The program provides funds to procure equipment for Navy Military Construction (MILCON) projects, including Intrusion Detection System(s) (IDS) and other Electronic Security System(s) (ESS) before building occupancy. The funds support the following six categories: Electronic Harbor Security Systems (EHSS) and Barriers; Physical Security/Access Control (Gates Automation & Perimeter Security); MILCON IDS; Command, Control, Computer, Communications & Intelligence (C4I) and Other Physical Security Equipment (PSE). [P40A / ELECTRONIC HARBOR SECURITY SYSTEMS (EHSS)]: Funds provided for Electronic Harbor Security Systems (EHSS) used for the detection and assessment of the potential threats. [P40A / Physical Security Access Control Installation Perimeter Access Control]: Funds provided for enhanced physical security posture and reduces manpower at unmanned pedestrian access control points. Additionally, funding supports remote monitoring, communications, and lock down, Defense Biometric Identification System (DBIDS) credential authentication at perimeter locations, Lenel credential authentication at internal enclave locations and provides crash-rated physical security posture and reduction of unauthorized vehicular access at installation access control points. [P40A / Physical Security Access Control Enclaves Electronic Security Systems]: Funds provided for additional layers of security, including secure ingress and egress, to a perimeter or area of interest requiring an enhanced security posture currently not available to support aircrafts (FA-18C, FA-18E/F, C-40). Enclave access control, intrusion detection, and video management systems supporting Vehicle automated access control point (ACP-A) for bi-directional locations, Navy Munitions Command Security System, Radar and/or EO/IR sensors, Command Control Television (CCTV) (daylight and uncooled thermal) assessment, Local sensor and video management server, Data over local N6 wired and/or secure wireless networks, Connected to Region through N6 PS-Net, Open S/W architecture for scalability, Standard data / video compression techniques, Integrate command & control via Physical Security Information Module (PSIM) with Local Dispatch Centers (LDC)/Regional Dispatch Centers (RDC) facilities, "Dispatchable" Alerts/Alarms sent to E-NERMS via LAMAS (or direct to CERS for OCONUS), and Commonality of enclave enterprise architecture design with other accredited NAVFAC ACP-A systems for long-term support and sustainment. Improves physical security at three Fleet facilities around pier enclaves through limited perimeter surveillance, sensor analytics, and remote situational awareness. Provide detection/surveillance capability at Entry Control Points (ECPs), Alarm Points (Fence), and waterside perimeter. Command Control Television (CCTV) (daylight and uncooled thermal) assessment, Local sensor and video management server. Connected to Region through N6 PS-Net, open software (S/W) architecture for scalability, standard data/video compression techniques, integrate command & control via PSIM Sensor viewing, analytics, and management functions controlled from Local Dispatch Center (LDC) and/or Regional Dispatch Center (RDC). Provide video surveillance, situational awareness 24/7 and reduces enclave manning requirements. [P40A / MILITARY CONSTRUCTION INTRUSION DETECTION SYSTEMS (MILCON IDS)]: Funding supports the procurement of additional MILCON IDS to allow more structures to comply with DoW minimum anti-terrorism standards for buildings. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 3 of 24 P-1 Line #139 Volume 5 - 275 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / COMMAND, CONTROL, COMPUTER, COMMUNICATIONS AND INTELLIGENCE (C4I)]: Funding support additional upgrades to Regional Dispatch Centers that provide regionalized/consolidated emergency call receipt, alarm monitoring, and 1st responder dispatching, Utilize centrally-hosted and supported Computer Aided Dispatch, Mobile Data Computers, Records Management Systems, Geographic Information System (GIS), Enterprise Land Mobile Radio (ELMR), and Alarm Automation to optimize emergency communication and response times. [P40A / Physical Security Recapitalization]: FY27 increase ($0.159M) for Physical Security Recapitalization Change to the Program: Adds OPN funding to address shortfalls in Navy Electronic Security Systems (ESS) Centrally Managed Program. Outcome: Funds NAV ESS Centrally Managed Program establishment (organic engineering expertise), ESS RDTE to align with SECNAV and N4 policy, and address high priority shore program priorities (Classified Material Storage Areas (CMSAs), AA&E Storage areas, Perimeter Protection). [P40A / Navy Construction Forces (NCF) FoSUAS Systems]: Funding supports the procurement of additional solution sets (multiple Type/Model/Series (T/M/S) with varying quantities of each) to provide a more robust family of systems and fulfill a broader scope of capability requirements as addressed in the Navy FoSUAS Top Level Requirement (TLR). Funding procures existing and emerging SUAS technologies, mission kits, and payloads in Fixed Wing (FW) and Vertical Take Off and Landing (VTOL) solution sets for Reconnaissance, Surveillance, and Target Acquisition (RSTA). FoSUAS includes Short Range/Short Endurance (SR/SE) and Medium Range/ Medium Endurance (MR/ME) categories of Small Unmanned Aircraft Systems (SUAS) with each category tailored toward specific mission needs/ profiles. As such, a mix of T/M/S SUAS makes up the FoSUAS Program of Record (PoR) as addressed in the Navy's FoSUAS TLR document. [P40A / Physical Security Water Barrier]: Funding provides for equipment to improve the physical security posture of Navy installations worldwide. The Physical Security Equipment (PSE) program procures equipment that supports and improves capabilities to detect, deter, and defeat terrorist and criminal activity targeted against Navy personnel, government property and facilities ashore/afloat. This ensures appropriate Anti-terrorism and Force Protection (ATFP) solutions are fielded. [P40A / Littoral Imaging System (LIS)]: Littoral Imaging System Funding supports the Littoral Imaging System (LIS) Unmanned Aerial System (UAS) to facilitate ship-to-shore entry operations through mapping and calculation of Modified Surf Index (MSI). Using imagery from the LIS UAS, sailors can map coastal terrain, water depth, and wave/current hazards (calculate MSI) prior to littoral entry. LIS rapidly generates shareable, geo-referenced maps of bathymetry, topography, and hydrodynamic hazards of interest which directly supports Distributed Maritime Operations (DMO) CONOPS. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 4 of 24 P-1 Line #139 Volume 5 - 276 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-40a Physical Security Equipment P-5a P-5 1 / Countering Small Unmanned Aerial Systems (C-sUAS) P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,772.399 - / 110.965 - / 136.945 - / 160.282 / - - / 2.812 - / 27.834 - / 29.632 - / 57.755 - - / 0.000 - / 160.282 / 57.755 / 1,775.211 - / 138.799 - / 166.577 - / 218.037 - / 0.000 - / 218.037 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: SSBN Waterfront Restricted Area Security (WRAS) FY 2027 Increase of $4.329 for SSBN WRAS costs due to (1) procurement of a Marine Corps Tactical Instrumentation System (MCTIS), a force on force training and simulation system at SWFLANT and (2) Initial procurement of long lead materials including Relative Reference Sensor System (R2S2) mounts and cabling to support outfitting of mission systems on two new leased Transit Protection Program (TPP) vessels. SSBN Counter UAS In FY 2027, due to an increased operational need for C-UAS systems for SSBN security, this cost element was broken out from the SSBN WRAS element. Increase from FY 2026 to FY 2027 of $19.571M provides for increased CUAS capability for transit protection of SSBNs. FY 2027 costs procure and integrate an initial SENSEI Afloat capability. Night Vision, Individual (AN/PVS-31B) FY 2027 funding supports the United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoW VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Funding provided to procure new and replacement night vision equipment, thermal detection equipment, day/night optics and associated test equipment for ships, submarines, carriers, expeditionary forces and shore installations so that commanders can maintain situational awareness in degraded visual environments while maintaining the greatest possible distance from threats. Littoral Imaging System (LIS) FY 2027 increase ($1.472M) funds procurement of the Littoral Imaging System (LIS) Unmanned Aerial System (UAS). Public Safety Systems (N6S) (Formerly ATFP) FY 2027 funding continues to support procurement of equipment for the improvement of physical security posture of Navy installations. FY 2027 funding supports procurement of equipment for the physical security posture of Navy installations. Funding supports additional upgrades to Regional Dispatch Centers who provide regionalized/ consolidated emergency call receipt, alarm monitoring, and 1st responder dispatching, utilize centrally hosted and supported Computer Aided Dispatch, Mobile Data Computers, Records Management Systems, Geographic Information System (GIS), Enterprise Land Mobile Radio (ELMR), and Alarm Automation to optimize emergency communication and response times. FY 2027 funding procures NG911dispatch systems to ensure compliance with federal law as well as several DoW directives and instructions. Outcome: Allows integration of caller information and location data into public safety answering point (PSAP) and dispatch solution in compliance with: (a) Federal Law 47CFR 9.16(b)(1) and 47 CFR 9.3 (b) DODI 6055.17 (c) DODI 2000.12 (d) SECNAV 3400.4(e) OPNAVINST 3440.17A. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 5 of 24 P-1 Line #139 Volume 5 - 277 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8128 / Physical Security Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY 2027 funding continues to support NAV ESS Centrally Managed Program establishment (organic engineering expertise), ESS RDTE to align with SECNAV and N4 policy, and address high priority shore program priorities (Classified Material Storage Areas (CMSAs), AA&E Storage areas, Perimeter Protection). Physical Security Water Barrier FY 2027 increase ($17.923M) supports Waterborne Security Barrier (WSB) integral assets within force protection configurations. Countering Small Unmanned Aerial Systems (C-sUAS) FY 2027 increase ($28.123M) is for the procurement of Low Collateral Defeat systems and the system upgrades to meet configurations determined by site evaluations. As well as the installation of updated hardware and networking to replace legacy aging systems. Funding across the FYDP will support ongoing system enhancements to keep pace with the rapid evolution of UAS technology. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 6 of 24 P-1 Line #139 Volume 5 - 278 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Physical Security Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) SSBN WATERFRONT RESTRICTED AREA SECURITY (WRAS) 1.1) SSBN Waterfront Restricted Area A - - - - 34.446 - - 37.193 - - 41.522 - - - - - 41.522 - - - - 7.537 - - 4.520 - - 24.091 - - - - - 24.091 - - 659.517 - - 41.983 - - 41.713 - - 65.613 - - - - - 65.613 9,327.06 1,382 12.890 170 2.176 194 2.406 193 2.470 - - - 193 2.470 2,020.41 49 0.099 - - - - - - - - - - - - - - - 450.00 11,109 4.999 470.00 247 0.116 460.00 244 0.112 475.00 224 0.106 - - - 475.00 224 0.106 - - 0.023 - - 0.407 - - 0.588 - - 0.316 - - - - - 0.316 - - 0.432 - - - - - - - - - - - - - - - - - 18.443 - - 2.699 - - 3.106 - - 2.892 - - - - - 2.892 676.37 8,105 5.482 696.82 2,299 1.602 711.08 2,184 1.553 725.40 2,005 1.454 - - - 725.40 2,005 1.454 712.56 12,719 9.063 742.85 4,528 3.364 757.64 4,368 3.309 772.75 4,009 3.098 - - - 772.75 4,009 3.098 588.65 12,719 7.487 613.74 4,528 2.779 625.92 4,368 2.734 638.40 4,009 2.559 - - - 638.40 4,009 2.559 672.51 3,307 2.224 702.44 1,025 0.720 716.67 879 0.630 730.90 710 0.519 - - - 730.90 710 0.519 - - 60.576 - - - - - - - - - - - - - - - - - 84.832 - - 8.465 - - 8.226 - - 7.630 - - - - - 7.630 (1) Security (WRAs) 1.2) SSBN TPP Counter Unmanned Aerial System (CUAS) 659.517 A - (2) Subtotal: 1) SSBN WATERFRONT RESTRICTED AREA SECURITY (WRAS) 2) VISUAL AUGMENTATION SYSTEMS (VAS) 2.1) Night Vision, Individual (AN/ PVS-31B) A (3)(†) 2.2) SU-289/VCOG/ SCO A 2.3) NVD Helmet A (†) Mount 2.4) TAC A 2.5) Visual Augmentation Systems (VAS) A Subtotal: 2) VISUAL AUGMENTATION SYSTEMS (VAS) 12,800.00 12,400.00 12,800.00 12,800.00 3) ANTI-TERRORISM AFLOAT (ATA) EQUIPAGE 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4)(†) 3.2) Maritime Armor System (5)(†) 3.3) Maritime Buoyant Plates (6)(†) 3.4) Enhanced Small Arms Protective Inserts A A A A (7)(†) 3.5) Anti-Terrorism Afloat (ATA) Equipage A Subtotal: 3) ANTI-TERRORISM AFLOAT (ATA) EQUIPAGE 4) BIOMETRICS LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 7 of 24 P-1 Line #139 Volume 5 - 279 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.1) Production Engineering A 4.2) Biometrically Enabled Access Control - Husbanding A (BEACH) MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Physical Security Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.750 - - 0.250 - - 0.250 - - 0.250 - - - - - 0.250 - - - - - 0.410 - - 1.119 - - 1.197 - - - - - 1.197 300 26.846 - - - - - - - - - - - - - - - - - 27.596 - - 0.660 - - 1.369 - - 1.447 - - - - - 1.447 - - 0.770 - - 0.009 - - 0.059 - - 0.032 - - - - - 0.032 - - 12.160 - - - - - - - - - - - - - - - 123 5.535 0.325 - - - - 18.465 - - 0.334 - - 0.384 - - 0.357 - - - - - 0.357 - - 12.933 - - - - - - - - - - - - - - - - - 12.933 - - - - - - - - - - - - - - - (8) 4.3) Identity Dominance System (IDS) A Subtotal: 4) BIOMETRICS 89,486.67 5) NAVY NON-LETHAL EFFECTS (NNLE) 5.1) Production Engineering A (9) 5.2) Navy Non-Lethal Effects (NNLE) Family of Systems A (10)(†) A 5.3) LROI-COIL Subtotal: 5) NAVY NON-LETHAL EFFECTS (NNLE) 45,000.00 - 65,000.00 5 0.325 65,000.00 5 0.325 65,000.00 5 65,000.00 5 0.325 6) NAVY EXPEDITIONARY LOGISTICS SUPPORT GROUP 6.1) NAVY EXPEDITIONARY LOGISTICS SUPPORT GROUP A Subtotal: 6) NAVY EXPEDITIONARY LOGISTICS SUPPORT GROUP 7) MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT 7.1) MOBILE DIVING AND SALVAGE UNIT OUTFITTING EQUIPMENT A Subtotal: 7) MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT - - 11.887 - - - - - - - - - - - - - - - - - 11.887 - - - - - - - - - - - - - - - - - 0.016 - - 0.277 - - 0.042 - - 0.233 - - - - - 0.233 - - 49.510 - - - - - - - - - - - - - - - - - - 318,270.00 2 0.637 - - - - - - 700.04 40 0.028 673.12 20 0.013 8) NAVAL SPECIAL WARFARE 8.1) TAC (11) A 8.2) Naval Special Warfare Forces A 8.3) NGHTS (NEXTGEN HANDHELD A TARG SYS) (12)(†) 8.4) FCS13 REMOTE (13)(†) A LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 8 of 24 337,652.64 5 1.688 - - - 337,652.64 5 1.688 693.00 150 0.104 - - - 693.00 150 0.104 P-1 Line #139 Volume 5 - 280 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 8.5) FCS13 RAIL A MOUNT (†) 8.6) FCS13 M240 MOUNT A (14)(†) 8.7) FCS13 MK19 MOUNT A (15)(†) 8.8) FCS13 M2 MOUNT A (†) (†) 8.9) FCS13 COM A 8.10) Night Vision, Individual (AN/ A PVS-31B) (†) 8.11) JTAC LASER IR Pointer (IZLID Ultra) A 8.12) LASER Pointer/ Illuminator, integrated Crew Served (SQUAD) (LA/5CPEQ) A 8.13) JTAC LASER Range Finder (SU-290/PEQ) A 8.14) Sensor, Enviromental (SU-288/PEQ) A 8.15) Thermal Hand Held Imager (HHI) (SKEET-IR) A 8.16) Thermal Hand Held Imager, Medium Range, (AN/PAS-32) A 8.17) SU-289/VCOG/ A (†) SCO 8.18) Crew Served Weapon Optic (CSWO)/Mounted Machine Gun Optic (MMO) 8.19) NVD Helmet Mount (NSN 5855-01-593-6375) (†) Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) - - - 654.00 160 0.105 - - - - - - 1,639.09 45 0.074 - - - - - - 656.00 50 0.033 708.80 16 - - - 2,185.00 77 0.168 2,251.00 - - - 2,339.72 40 0.094 8,722.58 1,240 10.816 12,800.00 94 1.203 5,516.13 31 0.171 - - - 4,801.50 267 1.282 - - 10,350.00 220 2.277 - 765.96 94 0.072 14,000.00 112 18,815.38 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - - - - - 1,639.09 10 0.016 - - - 0.011 744.52 16 0.012 - - 26 0.059 - - - - 2,409.91 15 0.036 - - - 13,310.00 280 3.727 170 - - - - - - - - - - - - - - - - 1.568 - - - 65 1.223 - - 1,541.30 460 0.709 - 3,116.75 394 1.228 450.29 1,197 0.539 31,307.69 13 0.407 (Each) ($ M) - - 1,639.09 10 0.016 - 744.52 16 0.012 - - - - - - - - - - - 2.176 - - - 170 2.176 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30 1.017 30 1.048 30 1.080 - - - 30 1.080 12,800.00 - Total Cost Qty 12,800.00 A A (†) 8.20) Aimpoint FCS13 (M3E1) MAIS FY 2025 Total Cost Aggregated Items Title: Physical Security Equipment A LI 8128 - Physical Security Equipment Navy 33,906.98 34,943.64 UNCLASSIFIED Page 9 of 24 35,991.95 P-1 Line #139 35,991.95 Volume 5 - 281 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 8.21) Nightforce, ATACR 7-35x56 F1 A (for MRAD) MAIS Code (†) 8.22) 120 mm Lens UTB A (†) Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Physical Security Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 4,270.27 37 0.158 - - - - - - - - - - - - - - - 1,893.62 47 0.089 - - - - - - - - - - - - - - - A 75,000.00 10 0.750 - - - - - - - - - - - - - - - 8.24) M2 Boars Mount A 708.33 48 0.034 - - - - - - - - - - - - - - - 8.25) FCS13 TH60 A - - - 30 0.885 30 1.048 30 0.940 - - - 30 0.940 - - 70.849 - - 4.521 - - 5.984 - - 6.249 - - - - - 6.249 8.23) INOD Blk III (16)(†) Subtotal: 8) NAVAL SPECIAL WARFARE 29,516.13 34,943.64 31,328.78 31,328.78 9) NSW Family of Small Unmanned Aircraft Systems (FoSUAS) 9.1) NSW Family of Small Unmanned Aircraft Systems (FoSUAS) A Subtotal: 9) NSW Family of Small Unmanned Aircraft Systems (FoSUAS) - - 33.564 - - 6.032 - - - - - - - - - - - - - - 33.564 - - 6.032 - - - - - - - - - - - - - - 1.546 - - - - - - - - - - - - - - - - - 1.546 - - - - - - - - - - - - - - - 10) EXPEDITIONARY MINE COUNTERMEASURES 10.1) Expeditionary Mine Countermeasures (ExMCM) A Subtotal: 10) EXPEDITIONARY MINE COUNTERMEASURES 11) MOBILE SECURITY FORCES - NCW ACTIVE COMPONENT 11.1) MOBILE SECURITY FORCE ACTIVE COMPONENT A Subtotal: 11) MOBILE SECURITY FORCES - NCW ACTIVE COMPONENT - - 119.622 - - - - - - - - - - - - - - - - - 119.622 - - - - - - - - - - - - - - - 12) NAVAL COASTAL WARFARE FORCES-RES COMP (SEC FOR) 12.1) MOBILE SECURITY FORCE RESERVE COMPONENT A Subtotal: 12) NAVAL COASTAL WARFARE FORCES-RES COMP (SEC FOR) - - 31.141 - - - - - - - - - - - - - - - - - 31.141 - - - - - - - - - - - - - - - 46.575 - - - - - - - - - - - - - - - 13) ENHANCED MARITIME INTERCEPTION OPERATIONS (EMIO) 13.1) ENHANCED MARITIME A - LI 8128 - Physical Security Equipment Navy - UNCLASSIFIED Page 10 of 24 P-1 Line #139 Volume 5 - 282 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] INTERCEPTION OPERATIONS (EMIO) ID CD MAIS Code Subtotal: 13) ENHANCED MARITIME INTERCEPTION OPERATIONS (EMIO) Unit Cost ($) Qty (Each) - - FY 2025 Total Cost Unit Cost ($ M) ($) 46.575 - Qty (Each) Aggregated Items Title: Physical Security Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - - - - - - - - - - 14) Public Safety Systems; formerly ANTI-TERRORISM FORCE PROTECTION ASHORE 14.1) ELECTRONIC HARBOR SECURITY SYSTEMS (EHSS) A 14.2) Physical Security Access Control Installation Perimeter Access Control A 14.3) Physical Security Access Control Enclaves Electronic Security Systems A 14.4) MILITARY CONSTRUCTION INTRUSION DETECTION SYSTEMS (MILCON IDS) A 14.5) COMMAND, CONTROL, COMPUTER, COMMUNICATIONS AND INTELLIGENCE (C4I) A 14.6) Next Generation 911 (NG911) A 14.7) Physical Security A - - 106.066 - - 8.443 - - 7.464 - - 6.167 - - - - - 6.167 - - 44.668 - - 8.513 - - 10.064 - - 8.061 - - - - - 8.061 - - 9.934 - - 4.684 - - 3.393 - - 2.211 - - - - - 2.211 - - 141.835 - - 2.000 - - 2.000 - - 2.000 - - - - - 2.000 - - 281.450 - - 7.784 - - 9.141 - - 7.878 - - - - - 7.878 - - - - - - - - 24.677 - - 12.333 - - - - - 12.333 - - - - - - - - 7.955 - - 8.114 - - - - - 8.114 - - 583.953 - - 31.424 - - 64.694 - - 46.764 - - - - - 46.764 - - 28.000 - - - - - - - - - - - - - - - - - 28.000 - - - - - - - - - - - - - - - (17) Recapitalization (18) Subtotal: 14) Public Safety Systems; formerly ANTI-TERRORISM FORCE PROTECTION ASHORE 15) Counter Unmanned Aerial System (CUAS) Sensors 15.1) CUAS Sensors for JUON CC-0558 A Subtotal: 15) Counter Unmanned Aerial System (CUAS) Sensors 16) Navy Construction Force (NCF) FoSUAS Systems LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 11 of 24 P-1 Line #139 Volume 5 - 283 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 16.1) Navy Construction Forces (NCF) FoSUAS A Systems MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Physical Security Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 18.176 - - 6.238 - - 4.120 - - 4.329 - - - - - 4.329 - - 18.176 - - 6.238 - - 4.120 - - 4.329 - - - - - 4.329 - - 5.300 - - 7.569 - - 7.349 - - 23.529 - - - - - 23.529 - - 5.300 - - 7.569 - - 7.349 - - 23.529 - - - - - 23.529 (19) Subtotal: 16) Navy Construction Force (NCF) FoSUAS Systems 17) Physical Security Water Barrier 17.1) Physical Security Water Barrier A (20) Subtotal: 17) Physical Security Water Barrier 18) Naval Small Craft Instruction and Technical Training School (NAVSCIATTS) FoSUAS 18.1) NAVSCIATTS FoSUAS Systems A - - - - - 1.040 - - - - - - - - - - - - - - 0.000 - - 1.040 - - - - - - - - - - - - - - - - - - - - - - - 1.472 - - - - - 1.472 Subtotal: 19) Littoral Imaging System (LIS) - - 0.000 - - - - - - - - 1.472 - - - - - 1.472 Total - - 1,772.399 - - - - - - 160.282 - - - - - 160.282 Subtotal: 18) Naval Small Craft Instruction and Technical Training School (NAVSCIATTS) FoSUAS 19) Littoral Imaging System (LIS) 19.1) Littoral Imaging System (LIS) (21) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 110.965 136.945 indicates the presence of a P-5a Footnotes: (1) FY 2027 Increase of $4.329 for SSBN WRAS costs due to (1) procurement of a Marine Corps Tactical Instrumentation System (MCTIS), a force on force training and simulation system at SWFLANT and (2) Initial procurement of long lead materials including Relative Reference Sensor System (R2S2) mounts and cabling to support outfitting of mission systems on two new leased Transit Protection Program (TPP) vessels. (2) In FY 2027, due to an increased operational need for C-UAS systems for SSBN security, this cost element was broken out from the SSBN WRAS element. Increase from FY 2026 to FY 2027 of $19.571M provides for increased CUAS capability for transit protection of SSBNs. FY 2027 costs procure and integrate an initial Sense and Interdiction (SENSEI) Afloat capability. (3) (4) (5) (6) (7) (8) (9) Procurement pricing is based on overall quantity of forecasted buys. FY27 increase due to increase in quantity and unit price. FY27 increase due to quantity required to compensate for the increased replacement of armor. FY27 increase due to quantity required for the increased replacement interval of armor due to deterioration of plates. FY27 decrease due to quantity required for the increased replacement interval of armor due to deterioration of plates. FY27 increase due to increase in production and production engineering support for BEACH system. FY27 to sustain production engineering funding to support production of 8 LROI-COIL systems. (10) FY27 to sustain LROI-COIL procurements to maintain a consistent industrial base and obtain full operational capability. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 12 of 24 P-1 Line #139 Volume 5 - 284 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) P-1 Line Item Number / Title: 8128 / Physical Security Equipment Aggregated Items Title: Physical Security Equipment Increase based off of shipment projections to include items that were/are previously delayed. MARCORSYSCOM reported a 2025 delay in contract award due to redesign of the system case after tests were performed. Procurement increase were shifted across the FYDP to accommodate schedule slip and meet requirements. Continued phased procurements to provide full operational capability to NSW forces. Quantities increased to rapidly meet inventory objective of 660 systems by FY30. Identified inventory objective of 66 to support NSW requirements. Quantities reduced to ensure phased procurement of systems through FY28. Unit Cost increase is due to inflation, did not get the economies of scales cost savings discount due to the QTY amount procured. Unit cost increase as result of reduced procurement quantities, prevents program from realizing cost savings typically achieved through economies of scale. FY26 decrease due to requirement changes. FY27 increases addresses shortfalls in Navy Electronic Security Systems (ESS). FY27 increase ($0.209M) due to increased NCF UAS operational system demand. FY 2027 increase ($16.180M) supports Waterborne Security Barrier (WSB) integral assets within force protection configurations. FY 2027 increase ($1.472M) funds procurement of the Littoral Imaging System (LIS) Unmanned Aerial System (UAS). LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 13 of 24 P-1 Line #139 Volume 5 - 285 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8128 / Physical Security Equipment Method/Type or Funding Vehicle Aggregated Items: Physical Security Equipment Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2023 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2022 Oct 2022 271 8,650.00 Y 2024 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2023 Oct 2023 250 8,650.00 Y 2025 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 170 12,800.00 Y 2026 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 194 12,400.00 Y (3) 2027 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 193 12,800.00 Y 2.3) NVD Helmet Mount 2023 Wilcox / Newington, NH C / IDIQ Crane, IN Feb 2023 Sep 2023 294 450.00 Y 2.3) NVD Helmet Mount 2024 Wilcox / Newington, NH C / IDIQ Crane, IN Feb 2024 Sep 2024 248 450.00 Y 2.3) NVD Helmet Mount 2025 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2024 May 2025 247 470.00 Y 2.3) NVD Helmet Mount 2026 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2025 Oct 2025 244 460.00 Y 2.3) NVD Helmet Mount 2027 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2026 Oct 2026 224 475.00 Y 2023 Gentex / Carbondale, PA MIPR DLA Philadelphia, PA Apr 2023 Apr 2023 3,765 670.12 Y 2024 Gentex / Carbondale, PA MIPR DLA Philadelphia, PA Dec 2023 Dec 2023 3,816 683.44 Y 2025 Gentex / Carbondale, PA MIPR DLA Philadelphia, PA Dec 2024 Dec 2024 2,299 696.82 Y 2026 Gentex / Carbondale, PA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 2,184 711.08 Y 2027 Gentex / Carbondale, PA MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 2,005 725.40 Y 2023 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Dec 2022 Dec 2022 3,765 713.94 Y 2024 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Jan 2024 Jan 2024 3,816 728.21 Y (Each) RFP Issue Date 2) VISUAL AUGMENTATION SYSTEMS (VAS) 2.1) Night Vision, Individual (AN/ PVS-31B) (3) 2.1) Night Vision, Individual (AN/ PVS-31B) (3) 2.1) Night Vision, Individual (AN/ PVS-31B) (3) 2.1) Night Vision, Individual (AN/ PVS-31B) (3) 2.1) Night Vision, Individual (AN/ PVS-31B) 3) ANTI-TERRORISM AFLOAT (ATA) EQUIPAGE 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4) 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4) 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4) 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4) 3.1) Next Generation Maritime Security Helmet (Enhanced Combat Helmet) (4) 3.2) Maritime Armor System (5) 3.2) Maritime Armor System (5) LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 14 of 24 P-1 Line #139 Volume 5 - 286 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] 3.2) Maritime Armor System (5) 3.2) Maritime Armor System (5) 3.2) Maritime Armor System (5) 3.3) Maritime Buoyant Plates (6) 3.3) Maritime Buoyant Plates (6) 3.3) Maritime Buoyant Plates (6) 3.3) Maritime Buoyant Plates (6) 3.3) Maritime Buoyant Plates (6) O O C 3.4) Enhanced Small Arms Protective Inserts (7) 3.4) Enhanced Small Arms Protective Inserts (7) 3.4) Enhanced Small Arms Protective Inserts (7) 3.4) Enhanced Small Arms Protective Inserts (7) 3.4) Enhanced Small Arms Protective Inserts (7) P-1 Line Item Number / Title: 8128 / Physical Security Equipment Method/Type or Funding Vehicle Location of PCO Aggregated Items: Physical Security Equipment Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Jan 2025 Jan 2025 4,528 742.85 Y 2026 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Oct 2025 Oct 2025 4,368 757.64 Y 2027 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Oct 2026 Oct 2026 4,009 772.75 Y 2023 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Dec 2022 Dec 2022 3,765 589.91 Y 2024 Atlantic Diving Supply, Inc. / Virginia Beach, VA WR NSWC PC, Panama City, FL Dec 2023 Dec 2023 3,816 601.68 Y 2025 TenCate Advanced Armor USA / Hebron, OH WR NSWC PC, Panama City, FL Dec 2024 Dec 2024 4,528 613.74 Y 2026 TenCate Advanced Armor USA / Hebron, OH WR NSWC PC, Panama City, FL Oct 2025 Oct 2025 4,368 625.92 Y 2027 TenCate Advanced Armor USA / Hebron, OH WR NSWC PC, Panama City, FL Oct 2026 Oct 2026 4,009 638.40 Y 2023 Point Blank Enterprises / Pompano Beach, FL MIPR DLA Philadelphia, PA Apr 2023 Apr 2023 1,108 675.09 Y 2024 Point Blank Enterprises / Pompano Beach, FL MIPR DLA Philadelphia, PA Dec 2023 Dec 2023 1,058 681.47 Y 2025 Point Blank Enterprises / Pompano Beach, FL MIPR DLA Philadelphia, PA Dec 2024 Dec 2024 1,025 702.44 Y 2026 Point Blank Enterprises / Pompano Beach, FL WR DLA Philadelphia, PA Oct 2025 Oct 2025 879 716.67 Y 2027 Point Blank Enterprises / Pompano Beach, FL WR DLA Philadelphia, PA Oct 2026 Oct 2026 710 730.90 Y 2023 OPTICS 1 / BEDFORD, NH MIPR Army NVESD May 2023 Oct 2023 49 45,000.00 Y 2025 OPTICS 1 / BEDFORD, NH WR NSWC PC, Panama City, FL Apr 2026 Aug 2026 5 65,000.00 Y 2026 OPTICS 1 / BEDFORD, NH WR NSWC PC, Panama City, FL Apr 2026 Aug 2026 5 65,000.00 Y 2027 OPTICS 1 / BEDFORD, NH WR NSWC PC, Panama City, FL Apr 2027 Aug 2027 5 65,000.00 Y 2025 Northrop Grumman / Apopka, FL C / IDIQ Quantico, MCB Oct 2024 Oct 2024 2 318,270.00 N (Each) RFP Issue Date 5) NAVY NON-LETHAL EFFECTS (NNLE) 5.3) LROI-COIL (10) 5.3) LROI-COIL (10) 5.3) LROI-COIL (10) 5.3) LROI-COIL (10) 8) NAVAL SPECIAL WARFARE 8.3) NGHTS (NEXT-GEN HANDHELD TARG SYS) (12) LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 15 of 24 P-1 Line #139 Oct 2024 Volume 5 - 287 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8128 / Physical Security Equipment FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Physical Security Equipment Location of PCO Award Date Date of First Delivery 8.4) FCS13 REMOTE (13) 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 8.4) FCS13 REMOTE (13) 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 8.4) FCS13 REMOTE (13) 2027 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2026 8.5) FCS13 RAIL MOUNT Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 40 700.04 N Oct 2025 20 673.12 N Oct 2026 150 693.00 N RFP Issue Date Oct 2024 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 160 654.00 N Oct 2024 8.6) FCS13 M240 MOUNT (14) 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 45 1,639.09 N Oct 2024 8.7) FCS13 MK19 MOUNT (15) 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 50 656.00 N Oct 2024 8.7) FCS13 MK19 MOUNT (15) 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 16 708.80 N 8.7) FCS13 MK19 MOUNT (15) 2027 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 16 744.52 N 8.8) FCS13 M2 MOUNT 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 77 2,185.00 N Oct 2024 8.8) FCS13 M2 MOUNT 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 26 2,251.00 N Oct 2025 8.9) FCS13 COM 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 40 2,339.72 N Oct 2024 8.9) FCS13 COM 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 15 2,409.91 N Oct 2025 8.10) Night Vision, Individual (AN/ PVS-31B) 2023 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2022 Oct 2022 439 8,650.00 N 8.10) Night Vision, Individual (AN/ PVS-31B) 2024 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2023 Oct 2023 394 8,650.00 N 8.10) Night Vision, Individual (AN/ PVS-31B) 2025 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 94 12,800.00 N 8.10) Night Vision, Individual (AN/ PVS-31B) 2026 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 280 13,310.00 N 8.10) Night Vision, Individual (AN/ PVS-31B) 2027 L3 Harris Technologies / Londonderry, NH MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 170 12,800.00 N 8.17) SU-289/VCOG/SCO 2023 Trijicon / Wixom, Michigan MIPR Quantico, MCB Oct 2022 Oct 2022 150 1,500.00 Y 8.17) SU-289/VCOG/SCO 2024 Trijicon / Wixom, Michigan MIPR Quantico, MCB Oct 2023 Oct 2023 275 1,500.00 Y 8.19) NVD Helmet Mount (NSN 5855-01-593-6375) 2023 Wilcox / Newington, NH C / IDIQ Crane, IN Feb 2023 Sep 2023 393 450.00 Y 8.19) NVD Helmet Mount (NSN 5855-01-593-6375) 2024 Wilcox / Newington, NH C / IDDQ Crane, IN Feb 2024 Sep 2024 400 450.00 N 8.20) Aimpoint FCS13 (M3E1) 2023 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2022 Oct 2022 7 31,500.00 N 8.20) Aimpoint FCS13 (M3E1) 2024 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2023 Oct 2023 5 31,500.00 N 8.20) Aimpoint FCS13 (M3E1) 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2024 Oct 2024 30 33,906.98 N 8.20) Aimpoint FCS13 (M3E1) 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 30 34,943.64 N 8.20) Aimpoint FCS13 (M3E1) 2027 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 30 35,991.95 N 8.21) Nightforce, ATACR 7-35x56 F1 (for MRAD) 2023 Nightforce Optics / Lavonia, GA C / IDIQ Crane, IN Oct 2022 Oct 2022 31 4,250.00 N LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 16 of 24 P-1 Line #139 Oct 2022 Oct 2025 Volume 5 - 288 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Aggregated Items: Physical Security Equipment FY Contractor and Location Method/Type or Funding Vehicle 8.21) Nightforce, ATACR 7-35x56 F1 (for MRAD) 2024 Nightforce Optics / Lavonia, GA C / IDIQ 8.23) INOD Blk III 2024 Leonardo DRS / Melbourne, FL C / IDIQ Crane, IN Oct 2023 Oct 2023 10 75,000.00 N Oct 2024 Oct 2024 30 29,516.13 N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 8128 / Physical Security Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Crant, IN Oct 2023 Oct 2023 6 4,250.00 N Qty (Each) RFP Issue Date 8.25) FCS13 TH60 (16) 2025 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PADLA Philadelphia, PA 8.25) FCS13 TH60 (16) 2026 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2025 Oct 2025 30 34,943.64 N Oct 2025 8.25) FCS13 TH60 (16) 2027 AIMPOINT / MANASSAS, VA MIPR DLA Philadelphia, PA Oct 2026 Oct 2026 30 31,328.78 N Oct 2026 LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 17 of 24 P-1 Line #139 Oct 2024 Oct 2024 Volume 5 - 289 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 2.812 27.834 29.632 57.755 0.000 57.755 - - - - - - 2.812 27.834 29.632 57.755 0.000 57.755 - - - - - - 2.812 27.834 29.632 57.755 0.000 57.755 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) C-UAS System (22) - - 0.000 - 6.241 - - 0.043 - - 3.333 - - 0.000 - - 3.333 1.1.2) C-UAS Handheld System - - 0.000 60 3.500 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 3.576 - - 11.552 - - 15.280 - - 0.000 - - 15.280 - - 0.000 - - 2.826 - - 1.376 - - 4.784 - - 0.000 - - 4.784 - - 0.000 - - 16.143 - - 12.971 - - 23.397 - - 0.000 - - 23.397 - - 0.000 - - 0.000 - - 0.354 - - 3.435 - - 0.000 - - 3.435 (26) - - 0.000 - - 0.000 - - 3.670 - - 12.539 - - 0.000 - - 12.539 1.2.3) Ninja EW System - - 0.000 - - 1.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,980K 7.918 1,991K 9.955 1,881K 13.170 - - 0.000 1,881K Enhancements Replacement (†) 1.1.3) Alternative Sensors (23) 1.1.4) System Installation & Upgrades (24) Subtotal: Recurring Cost - 58,333.33 Non Recurring Cost 1.2.1) System Networking (25) 1.2.2) Low Collateral Defeat 1.2.4) EW System Technical Refresh (27) (†) LI 8128 - Physical Security Equipment Navy 4 5 UNCLASSIFIED Page 18 of 24 7 P-1 Line #139 7 13.170 Volume 5 - 290 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Non Recurring Cost Subtotal: Hardware Hardware Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.000 - - 9.118 - - 13.979 - - 29.144 - - 0.000 - - 29.144 - - 0.000 - - 25.261 - - 26.950 - - 52.541 - - 0.000 - - 52.541 Support - Support Cost (28) - - 0.000 - - 0.000 - - 1.697 - - 3.914 - - 0.000 - - 3.914 2.2) Support Equipment - - 0.200 - - 0.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) Production Engineering Support - - 1.612 - - 0.978 - - 0.985 - - 1.300 - - 0.000 - - 1.300 2.4) Integrated Logistics Support (ILS) - - 1.000 - - 1.395 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Support Cost - - 2.812 - - 2.573 - - 2.682 - - 5.214 - - 0.000 - - 5.214 Gross/Weapon System Cost - - 2.812 - - 27.834 - - 29.632 - - 57.755 - - 0.000 - - 57.755 2.1) Other Costs (PES) (29) Remarks: The increase from FY26 to FY27 ($28.123M) includes the procurement of systems to address obsolesce of existing C-UAS systems and system components. Updated capabilities include detection of nonconforming Group 1 and 2 UAS, detection of Group 3 UAS, detection of swarms, and networking of specific systems into Intelligence Community architectures to enable output of data and input of rapid system/ effects updates. FY27 increase due to procurement and installation of updated hardware to replace legacy (aging) systems. (†) indicates the presence of a P-5a Footnotes: (22) (23) FY 2027 increase due to procurement and installation of updated hardware to replace legacy (aging) systems with Talon Spear (Pulsar). Funding provides for the procurement of advanced technologies for customized site-specific capability enhancements of the initial material solution based on localized and/or increased threats. Systems procured will be operationally assessed and will be evaluated for inclusion into the Family of Systems baseline. FY 2027 increase addresses the need for alternative sensors and customized solutions for pacing force protection and operational capabilities against the ever-evolving UAS threat. (24) Funding provides for the necessary infrastructure and installation support for the fielding of Talon Spear (Pulsar) C-UAS systems. FY27 increase due to the procurement of C-UAS equipment and Talon Spear (Pulsar) systems. As well as system upgrades to meet configuration determined by Site Evaluations. (25) Funding enables support for the integration and networking of all C-sUAS systems, ensuring alignment with configuration requirements identified through comprehensive site evaluations. This will optimize network performance across operational environments. FY27 increase is due to Talon Spear (Pulsar) & Corian (V3) systems being integrated and networked. (26) Funding provides for Low Collateral Defeat (LCD) solution procurement, integration, and fielding. LCD systems are essential for ability to defeat UAS that are not affected by Electronic Warfare measures. FY27 increase due to procurement and integration of LCD systems. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 19 of 24 P-1 Line #139 Volume 5 - 291 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8128 / Physical Security Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) MDAP/MAIS Code: (27) FY27 increase supports phased replacement of these end-of-life of Corian systems. The funding will also support the phased replacement of Ninja systems due to the completion of initial material solutions. In FY27 due to aging systems being replaced funding will support procuring new TBD systems. (28) (29) The FY27 increase in acquisition support will enhance the Navy's ability to execute effective oversight of the acquisition process, enabling timely and cost-effective delivery of program capabilities. FY27 increase supports additional production engineering and testing needed for new systems. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 20 of 24 P-1 Line #139 Volume 5 - 292 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements 1.1.2) C-UAS Handheld System Replacement 1.2.4) EW System Technical (†) Refresh 1.2.4) EW System Technical (†) Refresh 1.2.4) EW System Technical (†) Refresh (†) O O C FY P-1 Line Item Number / Title: 8128 / Physical Security Equipment Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2025 (30) DLA Troop Support Construction & Equipment / 700 Robbins Ave. Philadelphia, PA 19111-5919 C / CR Patuxent River, MD Aug 2025 Aug 2025 60 58,333.33 N Jul 2025 Jun 2025 2025 (31) DLA Troop Support / Philadelphia, PA C / CR DLA Philadelphia, PA Jul 2025 Jul 2025 4 1,980K N Jul 2025 Jun 2025 2026 NAWC WOLF / NAWCAD Patuxent River, MD C / CPFF Patuxent River, MD Jul 2026 Jul 2026 5 1,991K N May 2026 Jun 2026 2027 NAWC WOLF / NAWCAD Patuxent River, MD C / CPFF Patuxent River, MD Jul 2027 Jul 2027 7 1,881K N Oct 2026 Jun 2027 indicates the presence of a P-21 Footnotes: (30) (31) Qty will decrease from 60 to 5, higher priority for EW system technical refresh for procurement installation of updated hardware to replace the current aging systems. EW System Technical Refresh will be procured globally. LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 21 of 24 P-1 Line #139 Volume 5 - 293 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.2.4) EW System Technical Refresh Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (27) 1 2025 NAVY 4 0 4 2 2026 NAVY 5 0 5 2 2027 NAVY 7 0 7 A4 0 A5 0 7 O C T LI 8128 - Physical Security Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #139 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 294 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8128 / Physical Security Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 1.2.4) EW System Technical Refresh Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (27) 1 2025 NAVY 4 4 0 2 2026 NAVY 5 5 0 2 2027 NAVY 7 0 7 0 0 A7 O C T LI 8128 - Physical Security Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 23 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #139 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 295 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8128 / Physical Security Equipment Item Number / Title [DODIC]: 1 / Countering Small Unmanned Aerial Systems (C-sUAS) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 DLA Troop Support Philadelphia, PA TBD 2 NAWC WOLF - NAWCAD Patuxent River, MD TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8128 - Physical Security Equipment Navy UNCLASSIFIED Page 24 of 24 P-1 Line #139 Volume 5 - 296 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 697.628 697.628 697.628 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 42.026 42.363 40.490 0.000 40.490 32.405 30.403 29.452 - - - - - - - - 42.026 42.363 40.490 0.000 40.490 32.405 30.403 29.452 To FY 2031 Complete - Total - 30.062 Continuing - Continuing - 30.062 Continuing - Continuing - - - - - - - - - - 42.026 42.363 40.490 0.000 40.490 32.405 30.403 29.452 30.062 Continuing Continuing 0.072 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.085 0.020 0.017 - 0.017 0.043 0.041 0.077 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: NAVWAR IW Shore Platform: Naval Information Warfare Systems Command (NAVWAR) and PEOC4I Shore & Expeditionary Integration Program Office are recognized as the Navy's Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance / Information Technology (C4ISR/IT) integration Subject Matter Expert (SME) delivering Information Warfare (IW) Shore Platform Capabilities. Funding supports the identification and validation of C4ISR/IT system requirements, supporting ancillary tools and provides platform architecture, integration, and installation design planning efforts tailored to deliver specific required Capability to IW Shore Platforms. IW Shore Platforms support assured Command and Control, voice, video and data communications, Precise Time and Astrometry, and intelligence support services that are critical to allowing the flow of information from Strategic Commanders to the War Fighters both afloat and ashore. MILCON projects associated with IW Shore Platforms require complex planning based on the required capability, which includes advanced planning, integration, and installation of numerous C4ISR/IT systems across multiple programs of record that support Command Centers, Operations Centers and Master Telecommunication Facilities, CONUS and OCONUS. Requirements are derived by Required Operational Capability (ROC) / Projected Operational Environment (POE). Telephony: Tactical Voice and Video Communications and Modernization: The Department of War (DoW), Chief Information Officer (CIO) has prioritized the modernization of network infrastructure to be regionally-based, centrally-managed, and cyber secure. This includes migrating existing infrastructure from Time Division Multiplexing (TDM) to Internet Protocol (IP) based communications to enable Unified Capabilities (UC). Telephony procures and integrates Commercial-Off-The-Shelf (COTS) hardware and software to meet the DoW-CIO TDM to IP mandate for the Navy to ensure Distributed Command, Control, Communications (C3). Program requirements include: Tactical Voice and Video capabilities (e.g. Voice over Internet Protocol (VoIP), Voice over Secure Internet Protocol (VoSIP), Video Teleconferencing over UNCLAS and CLAS Internet Protocol), Regional Voice and Video capabilities (e.g. Regional Telephony Management System (RTMS), Telephony Required Ancillary Equipment (TRAE)). Telephony system installations and/or upgrades occur at facilities in accordance with requirements as identified by Office of the Chief of Naval Operations (OPNAV), Navy Information Forces (NAVIFOR), and Missile Defense Agency (MDA). NAVIFOR Military Construction (MILCON) Project P-013: Navy Information Operations Command, Hawaii (NIOC HI) performs all duties assigned by Commander Pacific Fleet (COMPACFLT), Fleet Cyber Command (FLTCYBERCOM) / Commander Tenth Fleet (COMTENTHFLT), Navy Information Forces (NAVIFOR), and the Director, National Security Agency. NIOC HI conducts and provides support to information warfare, cyber, signals intelligence, Information Operations (IO), and electronic warfare mission areas in the Pacific Fleet area of responsibility (PAC AOR). At the direction of United States Cyber Command (USCYBERCOM), FLTCYBERCOM / COMTENTHFLT will be deploying substantial Cyber Mission Forces to Oahu. Naval Computer and Telecommunications Area Master Station Pacific (NCTAMS PAC) and NIOC HI require close collaboration and alignment between the elements of the intelligence community under NIOC HI and the network operations under NCTAMS PAC in a controlled environment. Military Construction (MILCON) Project P-013 provides Sensitive Compartmented Information Facility (SCIF) space for three US Indo-Pacific Command (PACOM) Cyber Protection Teams, which currently has inadequate SCIF space. LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 1 of 12 P-1 Line #140 Volume 5 - 297 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / IW Shore Platform: MILCON P-130 NCTS Sigonella]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, livefire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Seniorlevel priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. Funding directly supports the advanced planning, system of systems architecture, and design and integration planning efforts required to deliver a new shore C4I platform that will host 30+ systems while providing uninterrupted communication and connectivity services to operational naval forces. [P5 / IW Shore Platform: MILCON P-131 NCTAMS LANT Det Souda Bay]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, live-fire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Senior-level priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. Funding directly supports the advanced planning, system of systems architecture, and design and integration planning efforts required to deliver a new shore C4I platform that will host 20+ systems while providing uninterrupted communication and connectivity services to operational naval forces. NSA Souda Bay is a vital transient point for the joint U.S. and NATO forces operating within three Combatant Commanders areas of responsibility. The airfield, the port, several NATO facilities, and its geographical location make it an invaluable support location for many exercises and operations, both NATO and U.S. hosted. Additionally, National Airborne Operations Center officially uses NSA Souda Bay to support its operations and requires a strong level of communications support. [P5 / IW Shore Platform: MILCON P-649 NCTS Guam]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, live-fire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Senior-level priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. Funding supports preparation efforts required for project reassessment, installation, and PIDR. It directly supports integration planning efforts required to deliver a new Joint shore C4I platform for uninterrupted communication and connectivity services to operational naval forces. [P5 / IW Shore Platform: MILCON P-678 SATCOM Gateway, Guam]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, live-fire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Senior-level priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. Funding directly supports the advanced planning, system of systems architecture, and design and integration planning efforts required to deliver a new satellite communications facility to support the upgrade and increase of communications system components and associated personnel growth required. Facility provides satellite communications and control services to Navy, Army, Joint and Coalition forces. [P5 / IW Shore Platform: MILCON P-676 Polaris Point Sub Pier COMM Facility]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, live-fire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Senior-level priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. Funding directly supports the advanced planning, system of systems architecture, and design and integration planning efforts required to deliver a new shore C4I platform. [P5 / IW Shore Platform: AUKUS Submarine Rotational Force West COMM Facility]: Funds supported the advanced planning, system of systems architecture, and design and integration planning efforts required to deliver a new shore C4I platform. LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 2 of 12 P-1 Line #140 Volume 5 - 298 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S)]: Funding supports a new facility that will provide Sensitive Compartmented Information Facility (SCIF) space for three Pacific Command (PACOM) Cyber Protection Teams. There will be adequate SCIF space to meet United States Cyber Command (USCYBERCOM) standards to support the Wahiawa information technology efforts to include both General Services and Top-Secret configuration. [P5 / MILCON P-131 NCTAMS LANT Det Souda Bay]: Funding provided for the procurement and installation of mission related Telephony equipment at the shore site MILCON P-131, Naval Computer and Telecommunications Area Master Station Atlantic (NCTAMS LANT) Detachment Souda Bay. [P5 / Telephony Procurement]: Funds provided for modernization efforts will replace hardware and software (HW/SW) legacy systems that is in a break-fix sustainment and at risk of system failure. These efforts will consolidate system footprints, address cyber vulnerabilities, obsolescence, and end-of-life issues that would affect tactical and enterprise voice and video capabilities on unclassified and classified systems. Telephony's modernization plan is designed to eliminate cyber security vulnerabilities due to HW/SW obsolescence. Additional funding supports non-recurring costs for engineering, material, and installation; transition of TDM users to GFE VOIP. [P5 / IP Conversion (OCONUS)]: IP Conversion supports the procurement of media conversion devices to transition legacy, antiquated base connections at 13 OCONUS Navy bases and ensure connectivity to local Internet Service Providers (ISP) for WAN transport for Public Safety Communications (PSC) to include voice, video and chat in support of 911/reverse-911, alarms, sensors and other key base services. [P5 / Centrex Modernization]: Centrex is a contracted service that often uses "off premises", vendor-owned hardware and services because the large customer bases that paid for these services have been eliminated. [P5 / Telephony Install Costs]: Funds provided for installations related to Time Division Multiplexing (TDM) to Internet Protocol (IP) infrastructure and services upgrades. Services such as 9-1-1 emergency response, mass notification systems, and industrial control networks rely on the effective deployment of the telephony infrastructure. [P5 / IP Conversion (OCONUS)]: IP Conversion supports the installation of media conversion devices to transition legacy, antiquated base connections at 13 OCONUS Navy bases and ensure connectivity to local Internet Service Providers (ISP) for WAN transport for Public Safety Communications (PSC) to include voice, video and chat in support of 911/reverse-911, alarms, sensors and other key base services. [P5 / NAVWAR IW Shore Platform]: The modernization of Information Warfare (IW) Platforms in all Areas of Operation are essential to decision superiority to Combatant Commands, live-fire Fleet Exercises, and Carrier/Expeditionary Strike Group Deployments afloat and ashore; and provides the critical operational platform required to achieve information dominance per Presidential and Senior-level priorities such as SECDEF Relook, CNO NAVPLAN, and Fight from the MOC. [P5 / Telephony Production Support]: Funds provided for production support associated with TDM to IP upgrades. LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 3 of 12 P-1 Line #140 Volume 5 - 299 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 2: Command Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Enterprise Information Technology P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 697.628 - / 42.026 - / 42.363 - / 40.490 - / 0.000 - / 40.490 - / 697.628 - / 42.026 - / 42.363 - / 40.490 - / 0.000 - / 40.490 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports the following: Naval Information Warfare Systems Command (NAVWAR) Information Warfare (IW) Shore Platform: FY27 increase is primarily attributed to MILCON Project maturity, removal and shifting Beneficiary Occupancy Dates (BOD). P130 will conduct Installation Readiness Review (IRR) and Initial Operating Capability (IOC). P131 will conduct the Full Operational Capability (FOC) and Initial Operating Capability (IOC). P649 transitions into Intermediate Installation Design Review (IIDR) and Preliminary Installation Design Review (PIDR). P678 will conduct Preliminary Installation Design Review (PIDR) and Critical Design Review (CDR). Starting FY27 Project P676 support has been realigned to higher priorities due to TYCOM strategic change. The Program of Record (POR) and Command IT (CIT) systems prepare for and execute installation efforts for all of these projects. The IW Shore Program will continue to support the installation efforts by overseeing each POR installation and ensuring the integration of each Platform facility meets Full Operational Capability (FOC) and achieves Full and Final Acceptance (FFA). Navy Information Forces (NAVIFOR) Collateral Equipment, MILCON Outfitting Project P-013: FY27 increase is due to C4I design delays. Telephony: FY27 decrease due to non-recurring costs for engineering, material, and installation; transition of Centrex Time Division Multiplexing (TDM) users to VOIP as well as project integration duties, replacement and modernization of aging TDM, also known as "analog" infrastructure at 23 primary and MILCON sites in three regions (Europe, Indian Ocean/Africa, Pacific). Funding will support hardware procurement necessary to address the transition of End-of-Life/End-of-Support (EOL/EOS) analog services to Internet Protocol (IP), also known as "digital" voice and video services. Current switches are quickly becoming obsolete, raising the cost for supportability and demanding rapid transition to IP technologies as a more cost-effective solution. Legacy TDM services will be able to transition to IP, military-unique features and preserve access to cloud services, preventing loss or degradation of communications during critical mission operations. The resulting upgraded infrastructure will provide Navy senior leaders with access to critical voice, video, and/or chat services; specifically, features allowing precedence, pre-emption, and Quality of Service (QoS). FY27 funds also support procurement of Shore Telephony capability at MILCON P-130 Sigonella and P-131 Souda Bay sites. LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 4 of 12 P-1 Line #140 Volume 5 - 300 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Enterprise Information Technology MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 42.026 42.363 40.490 0.000 40.490 - Gross/Weapon System Cost ($ in Millions) 697.628 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 697.628 Plus CY Advance Procurement ($ in Millions) - - - - - 42.026 42.363 40.490 0.000 40.490 - Total Obligation Authority ($ in Millions) 697.628 FY 2027 Total - - - - - 42.026 42.363 40.490 0.000 40.490 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.085 0.020 0.017 - 0.017 Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - NAVWAR Information Warfare (IW) Shore Platform Cost Recurring Cost 1.1.1) IW Shore Platform: MILCON P-913 NCTAMS LANT C4I - - 60.727 - - - - - - - - - - - - - - - 1.1.2) IW Shore Platform: MILCON P-130 NCTS Sigonella - - 11.784 - - 1.834 - - 1.604 - - 1.683 - - - - - 1.683 1.1.3) IW Shore Platform: MILCON P-131 NCTAMS LANT - - 9.243 - - 1.570 - - 0.813 - - 0.805 - - - - - 0.805 - - 18.648 - - 6.479 - - 5.754 - - 6.099 - - - - - 6.099 - - 8.892 - - 4.305 - - 4.400 - - 4.843 - - - - - 4.843 - - - - - 1.369 - - 0.306 - - - - - - - - - (1) Det Souda Bay (2) 1.1.4) IW Shore Platform: MILCON P-649 NCTS Guam 1.1.5) IW Shore Platform: MILCON P-678 SATCOM Gateway, Guam (4) 1.1.6) IW Shore Platform: MILCON P-676 Polaris Point Sub Pier COMM Facility (3) (5) LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 5 of 12 P-1 Line #140 Volume 5 - 301 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Enterprise Information Technology MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 1.1.7) IW Shore Platform: AUKUS Submarine Rotational Force West COMM Facility - - Subtotal: Recurring Cost - - Subtotal: Hardware NAVWAR Information Warfare (IW) Shore Platform Cost - - ($ K) - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 1.390 - - - - - - - - - - - - 109.294 - - 16.947 - - 12.877 - - 13.430 - - - - - 13.430 109.294 - - 16.947 - - 12.877 - - 13.430 - - - - - 13.430 0.181 - - - Hardware - NAVIFOR MILCON Outfitting (Non Telephony) Cost Non Recurring Cost 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements 6,239.500 6 37.437 183.000 1 0.183 179.000 1 0.179 181.000 1 181.000 1 0.181 (†) (6) MILCON (79S) Subtotal: Non Recurring Cost - - 37.437 - - 0.183 - - 0.179 - - 0.181 - - - - - 0.181 Subtotal: Hardware NAVIFOR MILCON Outfitting (Non Telephony) Cost - - 37.437 - - 0.183 - - 0.179 - - 0.181 - - - - - 0.181 - - - - - - - - 0.306 - - 0.551 - - - - - 0.551 - - - - - - - - - - - 1.028 - - - - - 1.028 Subtotal: Non Recurring Cost - - - - - - - - 0.306 - - 1.579 - - - - - 1.579 Subtotal: Hardware Telephony MILCONS Cost - - - - - - - - 0.306 - - 1.579 - - - - - 1.579 19 93.620 9.554 - - - - 93.620 9.554 - - - Hardware - Telephony MILCONS Cost Non Recurring Cost 3.1.2) MILCON P-130 NCTS Sigonella (7) 3.1.3) MILCON P-131 NCTAMS LANT Det Souda Bay (8) Hardware - Telephony Procurement Cost Recurring Cost 4.1.1) Telephony Procurement (†) (9) Subtotal: Recurring Cost 4,927.368 - 1,239.000 - 1 - 1.239 1.239 5,840.000 - 1 - 5.840 5.840 9,554.000 - 1 - 9,554.000 - 1 - 9.554 9.554 Non Recurring Cost LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 6 of 12 P-1 Line #140 Volume 5 - 302 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Enterprise Information Technology MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) 4.2.1) IP Conversion FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) Unit Cost ($ M) Qty (Each) Unit Cost ($ M) ($ K) - - (†) (10) - - - Subtotal: Non Recurring Cost - - - - - 22.000 - - 17.018 - - - 93.620 - - 23.239 - - 22.858 - - 16.627 - - 0.495 - - - - 16.627 - - 0.495 - 5.2.1) IP Conversion (OCONUS) - - - - - - Subtotal: Non Recurring Cost - - - - - Subtotal: Hardware Telephony Installations Cost - - 16.627 - (†) 4.2.2) Centrex Modernization Subtotal: Hardware Telephony Procurement Cost - ($ K) FY 2027 Base Total Cost - (OCONUS) - FY 2026 Total Cost 1 3.120 22.000 13,898.000 1 13.898 - (Each) Unit Cost ($ M) - ($ K) Qty (Each) Unit Cost ($ M) ($ K) (Each) ($ M) - - 10.407 - - - - 10.407 - - - - - 10.407 - - 19.961 - - - - - 19.961 2.336 - - 3.822 - - - - - 3.822 - 2.336 - - 3.822 - - - - - 3.822 - - 2.160 - - - - - - - - - - - - 2.160 - - - - - - - - - - 0.495 - - 4.496 - - 3.822 - - - - - 3.822 10,407.000 1 - Total Cost Qty - 1 3,120.000 Qty FY 2027 Total Total Cost - 22,000.000 - FY 2027 OOC Total Cost - 10,407.000 1 10.407 Hardware - Telephony Installations Cost Recurring Cost 5.1.1) Telephony Install Costs (11) Subtotal: Recurring Cost Non Recurring Cost Hardware - Prior Year Only Programs Cost Recurring Cost 6.1.1) Prior Year Only - - 430.916 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 430.916 - - - - - - - - - - - - - - - Subtotal: Hardware - Prior Year Only Programs Cost - - 430.916 - - - - - - - - - - - - - - - (13) - - 6.181 - - - - - 0.505 - - 0.520 - - - - - 0.520 7.2) Telephony Production Support - - 3.553 - - 1.162 - - 1.142 - - 0.997 - - - - - 0.997 Subtotal: Support Cost - - 9.734 - - 1.162 - - 1.647 - - 1.517 - - - - - 1.517 Gross/Weapon System Cost - - 697.628 - - 42.026 - - 42.363 - - 40.490 - - 0.000 - - 40.490 Programs (12) Support Cost 7.1) NAVWAR IW Shore Platform Remarks: LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 7 of 12 P-1 Line #140 Volume 5 - 303 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8161 / Enterprise Information Technology ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Enterprise Information Technology MDAP/MAIS Code: [Hardware] NAVWAR IW Shore Platform quantities are not provided since funding supports multi-year and various MILCON IW Shore Platform modernization efforts. Each design is tailored to meet a required capability. The Shore and Expeditionary Program Office provides portfolio management of MILCON IW Shore Platform efforts to manage requirements as they change due to real world events and to ensure required capability is delivered on time and within cost. Platform designs range from integrating 20 to 60+ different systems at each IW Shore Platform. Costs will vary by fiscal year for platforms based upon complexity and current phase in the associated MILCON project schedule. Requested budget is for advanced planning, system of system architecture design, integration, installation planning and supporting ancillary tools costs at the platforms. Specific procurement and installation costs are budgeted by the Programs of Record (POR) providing capability and are reflected in the POR budget exhibits. [Hardware/Recurring] Funds support the advanced planning, system of systems architecture, and design and integration planning efforts associated with the following IW Shore Platform MILCON projects that deliver Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance / Information Technology (C4ISR/IT) Capability: P130 - Naval Computer and Telecommunications Station (NCTS) Sigonella; P913 - Naval Computer and Telecommunications Area Master Station, Atlantic, (NCTAMS LANT C4I); P131 - NCTS Det Souda Bay; P649 - NCTS Guam; and P678 - SATCOM Gateway Guam. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) FY27 increase due to transitioning into C4I Installation Execution phase preparation, Installation Readiness Review (IRR) and Initial Operating Capability (IOC). FY27 decrease due to reduced coordination efforts required for preparation of Full Operational Capability (FOC) and Initial Operating Capability (IOC). FY27 increase due to project maturity transitioning Intermediate Installation Design Review (IIDR) and Preliminary Installation Design Review (PIDR). FY27 increase supports new satellite communications facility installation requirements for Preliminary Installation Design Review (PIDR) and Critical Design Review (CDR). FY27 decrease due to support for Project P676 being realigned to higher priorities as a result of TYCOM strategic change. FY27 increase will support planning, design, procurement and install of Defense Information Systems Agency (DISA) node and command IT services. FY27 funds support installation for Shore Telephony capability at MILCON P-130 Sigonella site. FY27 funds support procurement for Shore Telephony capability at MILCON P-131 Souda Bay site. FY27 ($3.714M) increase supports phased replacement and modernization of aging Public Safety Communications (PSC) and Facility Related Control Systems (FRCS) such as telephones, emergency/911 systems, intruder alarms, fire sensors, and other capabilities that are mandatory for safe and efficient base operations at Bahrain, Yokosuka and Joint Region Marianas-Guam. Modernizing to an IP-based solution ensures supportable systems necessary to meet the Shore Tactical communications mission requirements. Services such as 9-1-1 emergencies, mass notification systems, and industrial control networks rely on the effective deployment of the telephony infrastructure. (10) FY27 ($3.491M) decrease due to modernization of legacy hardware and software that have gone end of life/end of support (EOL/EOS). Funds support transition of expiring local commercial Time Division Multiplexing (TDM) services to Voice over IP (VOIP) services on Navy networks via Central Exchange services. Efforts will ensure continued Public Safety Communications (PSC) and Facility Related Control Systems (FRCS) with no significant loss of services or disruption to base operations. (11) FY27 ($1.486M) increase supports installations related to Time Division Multiplexing (TDM) to Internet Protocol (IP) infrastructure and services upgrades. These installations modernize, mitigate End-of-Life/ End-of-Support capabilities, and significantly reduces service outages. (12) Prior YR MILCON efforts reflected "Total Prior Years" -MILCON P-621 NCTAMS LANT Det Rota -IW Shore Platform: MILCON P-913 NCTAMS LANT C4I -MILCON P-621 NCTAMS LANT Det Rota -TUMS (V)1 Procurement (13) FY27 increase provides Shore Modernization Identification, Planning and Design efforts that support critical Shore Platform upgrades required for successful C4I system integration per OPNAV direction, e.g. Fight from the MOC, Fleet Unit renovations, Minor MILCONs, etc. LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 8 of 12 P-1 Line #140 Volume 5 - 304 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 O O C Item Number / Title [DODIC]: 1 / Enterprise Information Technology FY Contractor and Location Method/Type or Funding Vehicle 2025 NIWC PAC / NIWC PAC MIPR San Diego, CA Jan 2025 Jan 2025 1 183.000 N Mar 2023 2026 NIWC PAC / NIWC PAC MIPR San Diego, CA Jan 2026 Jan 2026 1 179.000 N Mar 2024 2027 NIWC PAC / NIWC PAC MIPR San Diego, CA Oct 2026 Oct 2026 1 181.000 N Jan 2029 (†) 2025 NIWC Atlantic / Charleston, SC C / CPFF NIWC Atlantic Nov 2024 Jan 2025 1 1,239.000 Y (†) 2026 NIWC Atlantic / Charleston, SC C / CPFF NIWC Atlantic Nov 2025 Jan 2026 1 5,840.000 Y (†) 4.1.1) Telephony Procurement 2027 NIWC Atlantic / Charleston, SC C / CPFF NIWC Atlantic Nov 2026 Jan 2027 1 9,554.000 Y 4.2.1) IP Conversion (OCONUS) 2026 NIWC Atlantic / Charleston, SC C / FFP Charleston, SC Nov 2025 Jan 2026 1 3,120.000 Y 4.2.2) Centrex Modernization (†) 2025 Leidos / Reston, Virginia C / FFP San Diego, CA Aug 2025 Nov 2025 1 22,000.000 Y 4.2.2) Centrex Modernization (†) 2026 Leidos / Reston, Virginia C / FFP San Diego, CA Mar 2026 Jun 2026 1 13,898.000 Y 4.2.2) Centrex Modernization (†) 2027 Leidos / Reston, Virginia C / FFP San Diego, CA Mar 2027 Jun 2027 1 10,407.000 Y Cost Elements 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S) (†) 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S) (†) 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S) (†) 4.1.1) Telephony Procurement 4.1.1) Telephony Procurement (†) P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Nov 2025 indicates the presence of a P-21 LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 9 of 12 P-1 Line #140 Volume 5 - 305 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Enterprise Information Technology Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S) D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (6) Prior Years Deliveries: 6 1 2025 NAVY 1 0 1 1 2026 NAVY 1 0 1 1 2027 NAVY 1 0 1 4.1.1) Telephony Procurement A1 0 A1 0 1 (9) Prior Years Deliveries: 19 2 2025 NAVY 1 0 1 2 2026 NAVY 1 0 1 2 2027 NAVY 1 0 1 4.2.2) Centrex Modernization A - - 1 0 A - - 1 0 1 (10) 3 2025 NAVY 1 0 1 3 2026 NAVY 1 0 1 3 2027 NAVY 1 0 1 A - - - 1 0 A - - - 1 0 1 O C T N O V LI 8161 - Enterprise Information Technology Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #140 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 306 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Enterprise Information Technology Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V 2.1.1) NAVIFOR P-013 - Wahiawa Shorebased Enhancements MILCON (79S) D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (6) Prior Years Deliveries: 6 1 2025 NAVY 1 1 0 1 2026 NAVY 1 1 0 1 2027 NAVY 1 0 1 4.1.1) Telephony Procurement 0 0 A1 0 (9) Prior Years Deliveries: 19 2 2025 NAVY 1 1 0 2 2026 NAVY 1 1 0 2 2027 NAVY 1 0 1 4.2.2) Centrex Modernization 0 0 A - - 1 0 (10) 3 2025 NAVY 1 1 0 3 2026 NAVY 1 1 0 3 2027 NAVY 1 0 1 0 0 A O C T N O V LI 8161 - Enterprise Information Technology Navy D E C J A N F E B M A R A P R M A Y 1 J U N 0 J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #140 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 307 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 2 P-1 Line Item Number / Title: 8161 / Enterprise Information Technology Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Enterprise Information Technology Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NIWC PAC - NIWC PAC TBD 2 NIWC Atlantic - Charleston, SC TBD 3 Leidos - Reston, Virginia TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 3 0 3 0 3 0 3 0 1 2 3 0 0 0 0 1 5 3 8 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8161 - Enterprise Information Technology Navy UNCLASSIFIED Page 12 of 12 P-1 Line #140 Volume 5 - 308 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,165.718 1,165.718 1,165.718 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 226.479 226.479 226.479 185.755 185.755 185.755 223.647 223.647 223.647 0.000 0.000 0.000 223.647 192.549 223.647 192.549 223.647 192.549 192.758 192.758 192.758 195.829 195.829 195.829 To FY 2031 Complete 199.948 Continuing 199.948 199.948 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.147 - - - - - - - - - 1.147 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Next Generation Enterprise Network (NGEN) program mission is to ensure and provide a modernized enterprise approach to delivery of a fully integrated, interoperable, and secure networking platform capable of delivering the information technology (IT)-based mission needs of major Fleet and shore-based Navy claimants and stakeholders. The network has begun modernization efforts towards a flexible and agile IT standard approach, using an architecture and service strategy aligned with commercial best practices. The new service delivery approach features diverse sourcing, leveraging of cloud/web-scale infrastructure and software-defined flexibility, which the Navy will seek to take advantage of the NGEN Re-compete (NGEN-R) family of contracts. NGEN is implementing a technical enterprise architecture that replaces obsolete technologies associated with Navy/Marine Corps Intranet (NMCI) and ONE-Net platforms. Navy's Digitization Journey is dependent upon the Navy's Enterprise Network. The modernized platform will meet today's and future mission requirements. Current on-premise infrastructure must transform and evolve to a future cloud native environment to enable the warfighter to access data across multiple domains. Through recapitalization of applicable legacy hardware and converging network infrastructure toward a cloud native design, NGEN will reduce the need for constant platform reconfiguration and ensure the end-user receives current capabilities required to perform job functions at various classification levels. Multifactor authentication and centralized management of user personas enables zero-trust based cyber security from the onset of system development throughout the entire lifecycle. Uniform enterprise security controls across the system lifecycle ensures consistency across the development, testing, and operational phased deployment workflow thus reducing rework. The flattened network design will enable contracting and acquisitions to quickly deploy solutions from the labs to the user community in near real-time. Key objectives of the compliance based technical refresh and modernization approach include the broad implementation of the following: Network Management: The Network Product Group requires compliance-based tech refresh of Continental United States (CONUS) and Outside the Continental United States (OCONUS) hardware/software required to support network performance and resiliency for the warfighter. A significant amount of these assets has reached end-of-life and are no longer supported by the vendors, leaving failed hardware without replacement options and opening the network to vulnerabilities with unsupported software which diminishes enterprise solutions, performance, and optimization. Our current infrastructure is aged, and refresh is essential to accommodate new emerging workforce requirements and maintain network performance and architecture/solution accreditations until capabilities can be transformed. Cybersecurity: Compliance-based tech refresh to pace the obsolescence-based cyber security threat until replaced by Network Transformation efforts. Upgrade of NMCI hardware/software and assigned nonIT assets required to support full litany of cyber security controls both CONUS & OCONUS that improve security posture from vulnerabilities, integrate / ensure adherence to DoW mandated security controls for the Naval Enterprise Network (NEN). A significant amount of those assets have reached end-of-life and are no longer supported by the vendors, which potentially makes the infrastructure vulnerable to LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 1 of 6 P-1 Line #142 Volume 5 - 309 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A external cyber-attacks. Our current infrastructure is aged, and modernization is essential to improve advanced endpoint asset management, enhanced network access control, malware detection, and the ability to respond to threats in near real-time that are used to support endpoint configuration baselines and compliance across thousands of endpoints. Information Transport: Upgrades existing Network Product Group hardware and or software to mitigate end-of-life and end-of-support issues to maintain network performance, architecture/solution accreditations and network security. The objective is to make obsolescence improvements to unclassified and classified transport boundaries that will increase port connectivity for users from 100M to 1G user ports, and from 1G to 10G bandwidth to Data Centers/Transport Boundaries. Cloud Services: Cloud-based Software-as-a-Service (SaaS), Infrastructure-as-a-Service (IaaS), Platform-as-a-Service (PaaS), offering that upgrades / refreshes on-premise e-mail infrastructure and additionally offers capabilities like Teams and SharePoint Online. Transformation: The current NEN CONUS and OCONUS infrastructure is aged with a significant amount having reached end-of life or end-of-sale with support no longer available by vendors, diminishing enterprise solutions performance and optimization while making the network vulnerable to external cyber-attacks. Network transformation and modernization efforts are essential to ensure the warfighter can accommodate new emerging workforce requirements, increase network performance, architecture/solution accreditations, and network security for the IT Infrastructure, Digital Workplace and Cybersecurity & IT Lifecycle Solutions. The transformation of the NEN is a key enabler for near and long-term mission effectiveness and is done by modernizing, rationalizing, standardizing and converging infrastructure, services, processes and policies of the ONE-Net and NMCI operating models. This investment in critical infrastructure will enhance the warfighters experience with cloud computing and storage, increased transport capacity, automation and cloud native zero trust performance monitoring that will increase security, availability, and resiliency of the network and capitalize on an "as a service" model reducing the overall hardware footprint and sustainment cost. Transformation provides for NIPR and SIPR network security and technology improvement initiatives that encompass systems/security engineering and integration, production, installation and implementation of network infrastructure requirements. Investments in network convergence of ONE-Net and NMCI operating models include the migration of networks, processes, services, tools and operations of integrated Navy NIPR (unclassified) and SIPR (classified) network enclaves via a common operational approach as ONE-Net and NMCI business and operating models are merged and infrastructure solutions are aligned. Investments in Naval Exchange Points (NXP) are aligned with the SECNAV's Information Superiority Vision 2.0 pillars to build and support an agile and resilient Information Environment that gives the Navy competitive advantage while maximizing the effectiveness of our investments. This capability enables Navy to Optimize the DON IT environment by accelerating adoption of game changing commercial technologies that provide a resilient, defendable, survivable and Secure network design, enables Zero Trust and shifts to a Cyber Ready approach using a data-first mindset to decide how to shape the architecture. Deployment of Naval Exchange Points will ensure the Naval Enterprise Networks are migrated towards a modern information ecosystem architecture with upgraded, resilient infrastructure adept to meet the needs of modern day information warfare delivering and maintaining a real-time Cyber Ready posture that implements Zero Trust and securely moves data from anywhere to anywhere via agnostic network transport aligned to the Chief of Naval Operations for Information Warfare Navy Blueprint. Investments in SIPR Modification (SIPR MOD) provide for a complete overhaul of the Navy's SIPR infrastructure moving from "on-premise" to a highly resilient "cloud based" hosting environment. This initiative supports operations for full Zero Trust implementation for the SIPR environment leveraging Naval Exchange Points (NXP) co-locations (COLOs) for transport functionality. Investments in Targeting Network Modernization (NETMOD) will modernizes critical IT infrastructure by replacing end-of-life (EOL)/end-of-support (EOS) Base Area Network (BAN) and Local Area Network (LAN) equipment with a high-speed, resilient wired and wireless network aligned to the Navy Operational Transport Architecture. Leveraging a modern service delivery model, centralized management, and advanced automation capabilities, this project significantly improves network performance, security, and availability. Key benefits include: faster incident resolution through enhanced network telemetry, reduced vulnerability exposure and remediation time, increased network resilience through a single operating system and automated upgrade processes, and enhanced security through advanced threat detection and prevention. This modernization effort directly supports Navy Transformation by providing personnel with ubiquitous, high-performance connectivity, thereby enabling greater mobility and operational effectiveness. LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 2 of 6 P-1 Line #142 Volume 5 - 310 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Next Generation Enterprise Service - / 1,165.718 - / 226.479 - / 185.755 - / 223.647 - / 0.000 - / 223.647 P-40 Total Gross/Weapon System Cost - / 1,165.718 - / 226.479 - / 185.755 - / 223.647 - / 0.000 - / 223.647 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Net increase between FY26 and FY27 is $37.892M. FY27 plans are as follows: -Network Management funding supports critical NEN CONUS and OCONUS hardware and software compliance based technical refreshes to network performance while modernized capabilities are being transformed and will slow down the rapid rate of technical debt accumulation that continues to compound year over year. Funding supports reducing the risk of network vulnerabilities and improving resiliency for the warfighter at High Interest sites with transport and boundary upgrades , continued migration toward a unified shore and tactical edge afloat network, integration and expansion of the mobile platform, and implementation of a technical enterprise architecture that replaces obsolete technologies associated with the CONUS and OCONUS platforms. FY27 increase ($13.149M) is driven by investment upgrades for critical network infrastructure that is End-of-Life, obsolete, and unsupported by the original manufacturer. Replacing critical Technical Debt that has surpassed End-of-Life enables the Naval Enterprise Network to migrate towards a modern information ecosystem architecture with upgraded, resilient infrastructure to meet the needs of modern day information warfare by delivering and maintaining a real-time Cyber Ready posture that implements Zero Trust and securely moves data from anywhere to anywhere via agnostic network transport in alignment with the Chief of Naval Operations for Information Warfare Navy Blueprint. -Cybersecurity supports NMCI hardware and software compliance based technical refresh to pace the obsolescence-based cyber security threat until replaced by Network Transformation and modernization efforts. Funds provided will continue engineering, integration, and implementation for replacement of DISA's Endpoint Security Solution (formerly Host Based Security System (HBSS)), existing Cisco and Trellix Intrusion Prevention System (IPS) sensors, Assured Compliance Assessment Solution (ACAS) for infrastructure expansion (i.e., add additional servers) and Department of Defense Zero Trust Strategy developed under section 1528 of the National Defense Authorization Act for Fiscal Year 2022. FY27 increase ($0.276M) is due to inflation. -Information Transport funding will continue to eradicate technical debt for unclassified and classified transport boundaries to include the technical refresh modernization program of NEN CONUS and OCONUS networks by replacing 450 100M KG-175D with 1GB encryption device to alleviate the legacy latent SIPR bandwidth issues, and complete enterprise transport implementations to buy down end of life equipment to include Certificate Logon (CLO) enforcement and hardware warranty for new hardware implemented in SMIT Development and Baseline Labs. FY27 increase ($0.253M) is due to inflation. -Cloud Services refreshes on-premise infrastructure in order to offer capabilities like Teams and SharePoint Online. Funds provided will continue Classified and Unclassified NMCI Voice/Video over Internet Protocol (VVoIP) Cryptographic Login (CLO) infrastructure upgrades to include design, hardware and software procurement, and implementation of mandated CLO requirement for NMCI VVoIP infrastructure. FY27 increase ($0.064M) is due to inflation. -Transformation funding will minimize the distance between the user and cloud services by continuing to invest in critical infrastructure requirements defined in the DoW Sec IL6 and Nautilus Agile Release Trains, improving computing and storage capacity with Flank Speed Edge Azure deployments that reduce operation and management complexity while increasing security, availability and resiliency of the network and deliver a modern end user experience. Strategic Flank Speed Edge deployments will enable future reductions in non-IT infrastructure expenses by reducing the Naval IT footprint across the Enterprise. The Network Product Group will realize improved transport by reducing hairpins and cutting over rehomed edge sites to existing Naval Exchange Points (NXP) while procuring critical hardware for two (2) OCONUS sites. A Base Area Network (BAN)/Local Area Network (LAN) redesign will continue to move towards bringing "any data, any time" to the warfighter and a data backup/resiliency solution will ensure LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 3 of 6 P-1 Line #142 Volume 5 - 311 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A that the data is not lost. Transformation continues expansion of Internet Protocol version 6 (IPv6) and 5G, Cloud SASE Interface, implementation of Zero Trust capabilities and Naval Identity Services (NIS) and enables ONE-Net and NMCI convergence. FY27 increase ($24.150M) is primarily driven by Naval Exchange Points (NXP) capability expansion (+$10.249M) and Targeting Network Modernization (NETMOD) infrastructure investments (+$13.901M). -Naval Exchange Points (NXP) capability expansion (+$10.249M) will integrate joint and tactical airborne assets into the NXP environment to support increased connections for distributed operations. This capability will fully integrate Maritime Operations Centers (MOCs) within the tactical environment and joint partners and increases critical network resiliency and capability to support the warfighter. -Targeting Network Modernization (NETMOD) (+$13.901M) of mission essential sites will modernizes critical IT infrastructure by replacing end-of-life (EOL)/end-of-support (EOS) Base Area Network (BAN) and Local Area Network (LAN) equipment with a high-speed, resilient wired and wireless network aligned to the Navy Operational Transport Architecture. Leveraging a modern service delivery model, centralized management, and advanced automation capabilities, this project significantly improves network performance, security, and availability. LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 4 of 6 P-1 Line #142 Volume 5 - 312 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Next Generation Enterprise Service MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 1,165.718 Less PY Advance Procurement ($ in Millions) 226.479 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 223.647 - 0.000 - 185.755 223.647 - 223.647 - 226.479 FY 2027 Total 0.000 - 185.755 - 1,165.718 - - 226.479 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 185.755 - 1,165.718 FY 2027 Base - 223.647 - 223.647 - 0.000 223.647 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.147 - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - NGEN/P013 MILCON Prior Year Cost Cost Recurring Cost 1.1.1) Prior Year - - 644.779 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 644.779 - - - - - - - - - - - - - - - Subtotal: Hardware - NGEN/ P013 MILCON Prior Year Cost Cost - - 644.779 - - - - - - - - - - - - - - - - - 82.072 - - 27.953 - - 75.926 - - 89.075 - - - - - 89.075 2.1.2) NGEN Cybersecurity - - 39.528 - - 13.529 - - 13.800 - - 14.076 - - - - - 14.076 2.1.3) NGEN Information Transport - - 27.636 - - 12.425 - - 12.673 - - 12.926 - - - - - 12.926 2.1.4) NGEN Cloud Services - - 9.134 - - 3.128 - - 3.215 - - 3.279 - - - - - 3.279 - - 362.569 - - 169.444 - - 80.141 - - 104.291 - - - - - 104.291 Requirements (1) Hardware - NGEN Cost Recurring Cost 2.1.1) NGEN Network Management (2) 2.1.5) NGEN Transformation (3) Subtotal: Recurring Cost - - 520.939 - - 226.479 - - 185.755 - - 223.647 - - - - - 223.647 Subtotal: Hardware - NGEN Cost - - 520.939 - - 226.479 - - 185.755 - - 223.647 - - - - - 223.647 Gross/Weapon System Cost - - 1,165.718 - - 226.479 - - 185.755 - - 223.647 - - 0.000 - - 223.647 LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 5 of 6 P-1 Line #142 Volume 5 - 313 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 P-1 Line Item Number / Title: 8164 / Next Generation Enterprise Service ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Footnotes: (1) (2) Item Number / Title [DODIC]: 1 / Next Generation Enterprise Service Prior year amount accounts for NGEN and P013 Milcon prior costs. FY27 increase in Network Management ($13.149M) driven by investment upgrades for critical network infrastructure that is end-of-life, obsolete, and unsupported by the original manufacturer. Replacing critical Technical Debt that has surpassed End-of-Life enables the Naval Enterprise Network to migrate towards a modern information ecosystem architecture with upgraded, resilient infrastructure to meet the needs of modern day information warfare by delivering and maintaining a real-time Cyber Ready posture that implements Zero Trust and securely moves data from anywhere to anywhere via agnostic network transport in alignment with the Chief of Naval Operations for Information Warfare Navy Blueprint. (3) Transformation: FY27 increase ($24.150M) is primarily driven by Naval Exchange Points (NXP) capability expansion (+$10.249M) and Targeting Network Modernization (NETMOD) infrastructure investments (+$13.901M). Naval Exchange Points (NXP) capability expansion (+$10.249M) will integrate joint and tactical airborne assets into the NXP environment to support increased connections for distributed operations. This capability will fully integrate Maritime Operations Centers (MOCs) within the tactical environment and joint partners, and increases critical network resiliency and capability to support the warfighter. Targeting Network Modernization (NETMOD) (+$13.901M) of mission essential sites will modernizes critical IT infrastructure by replacing end-of-life (EOL)/end-of-support (EOS) Base Area Network (BAN) and Local Area Network (LAN) equipment with a high-speed, resilient wired and wireless network aligned to the Navy Operational Transport Architecture. Leveraging a modern service delivery model, centralized management, and advanced automation capabilities, this project significantly improves network performance, security, and availability. FY25 Above Threshold Reprogramming (FY25-14PA) increased funding by $81.379M for Network Modernization to the Naval Exchange Point (NXP) to address current cyber vulnerabilities. Funds supported the DON's implementation of full Zero Trust in the SIPR environment. FY25 Below Threshold Reprogramming increased funding by $15.000M provide for a complete overhaul of the Navy's SIPR infrastructure moving from "on-premise" to a highly resilient "cloud based" hosting environment. LI 8164 - Next Generation Enterprise Service Navy UNCLASSIFIED Page 6 of 6 P-1 Line #142 Volume 5 - 314 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8645 / Cyberspace Activities Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 48.259 2.195 2.239 7.131 0.000 7.131 6.003 5.438 5.552 5.663 - 82.480 Total - - - - - - - - - - - - 48.259 2.195 2.239 7.131 0.000 7.131 6.003 5.438 5.552 5.663 - 82.480 - - - - - - - - - - - - 48.259 2.195 2.239 7.131 0.000 7.131 6.003 5.438 5.552 5.663 - 82.480 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Information Operations Condition (INFOCON) 3: Funding supports procurement of software, licensing upgrades, and technical support for hardware/software that enhance analytical capacity and host based security system mission system changes which provide warning to mitigate host level malicious activity. The software enables Joint Information Management System (JIMS) capability to work across systems (Navy to Joint), provides reciprocal communications via web service calls, allows process and technology interfaces for incident reporting, and provides situational awareness of U.S. Navy incidents. [P5 / NAVIFOR INFOCON 3 - Security Compliance (32F)]: Funds provided for the procurement of mission systems Hardware (HW) and Software (SW) required to maintain security compliance of Computer Network Defense protections (responsibilities, processes, and procedures), as it applies to Non-classified Internet Protocol Routing Network (NIPRNET) and Secret Internet Protocol Router Network (SIPRNET) systems. LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 1 of 8 P-1 Line #143 Volume 5 - 315 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 07: Personnel & Command Support Equip / BSA 5: Other ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8645 / Cyberspace Activities Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Cyberspace Activities P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 48.259 - / 2.195 - / 2.239 - / 7.131 - / 0.000 - / 7.131 - / 48.259 - / 2.195 - / 2.239 - / 7.131 - / 0.000 - / 7.131 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funds increase ($4.892M) supports mission scope and associated costs to support network security compliance as part of Information Operations Condition (INFOCON) 3 - Security Compliance. LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 2 of 8 P-1 Line #143 Volume 5 - 316 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 8645 / Cyberspace Activities Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Cyberspace Activities MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 48.259 2.195 2.239 7.131 0.000 7.131 - - - - - - 48.259 2.195 2.239 7.131 0.000 7.131 - - - - - - 48.259 2.195 2.239 7.131 0.000 7.131 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - USFFC BSO 60 Costs Cost Recurring Cost 1.1.1) NAVIFOR INFOCON 3 - Security Compliance (32F) (†) (1) 1.1.2) NAVIFOR Deployable Mission (†) Support Systems 1.1.3) NAVIFOR Persistent Cyber Training Environment 18,063.000 1 18.063 2,195.000 1 2.195 2,239.000 1 2.239 7,131.000 1,454.389 18 26.179 - - - - - - - 3,017.000 1 3.017 - - - - - - 1 7.131 - - - 7,131.000 1 7.131 - - - - - - - - - - - - - - - - - (†) (PCTE) node (55F1) 1.1.4) NAVSEA CYBER - - 1.000 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 48.259 - - 2.195 - - 2.239 - - 7.131 - - - - - 7.131 Subtotal: Hardware - USFFC BSO 60 Costs Cost - - 48.259 - - 2.195 - - 2.239 - - 7.131 - - - - - 7.131 Gross/Weapon System Cost - - 48.259 - - 2.195 - - 2.239 - - 7.131 - - 0.000 - - 7.131 (†) indicates the presence of a P-5a Footnotes: LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 3 of 8 P-1 Line #143 Volume 5 - 317 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 P-1 Line Item Number / Title: 8645 / Cyberspace Activities ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Cyberspace Activities MDAP/MAIS Code: (1) FY27 funds increase ($4.892M) will be used for tech refresh of Cyber Defense Mission Support System (CDMSS). Tech refresh includes hardware upgrade of computers and other associated hardware. CDMSS supports Cyber Mission Force (CMF) teams' ability execute the command's mission to direct, synchronize, and coordinate cyberspace operations in defense of U.S. national interests. Members of the CMF work to ensure commanders across the Joint Force can operate freely in the cyber domain and accomplish their assigned missions. LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 4 of 8 P-1 Line #143 Volume 5 - 318 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 O O C Item Number / Title [DODIC]: 1 / Cyberspace Activities FY Contractor and Location Method/Type or Funding Vehicle 2024 NAVSUP / Norfolk Various NIWC PAC Sep 2024 Sep 2024 1 5,144.000 N Sep 2024 2025 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC Various NIWC PAC Sep 2025 Sep 2025 1 2,195.000 N Sep 2025 2026 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC Various NIWC PAC Sep 2026 Sep 2026 1 2,239.000 N Sep 2026 (†) 2027 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC Various NIWC PAC Oct 2026 Oct 2026 1 7,131.000 N Sep 2027 1.1.2) NAVIFOR Deployable Mission Support Systems 2024 Naval Information Warfare Systems Command, San Diego, CA / San Diego, CA Various ** NO PCO ** Oct 2023 Oct 2023 1 6,000.000 N 1.1.3) NAVIFOR Persistent Cyber Training Environment (PCTE) node 2024 Program Executive Office / Orlando, FL Various PEO-STRI Oct 2023 Nov 2023 1 3,017.000 N Cost Elements 1.1.1) NAVIFOR INFOCON 3 Security Compliance (32F) (†) 1.1.1) NAVIFOR INFOCON 3 Security Compliance (32F) (†) 1.1.1) NAVIFOR INFOCON 3 Security Compliance (32F) (†) 1.1.1) NAVIFOR INFOCON 3 Security Compliance (32F) (†) (55F1) (†) P-1 Line Item Number / Title: 8645 / Cyberspace Activities Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Oct 2024 indicates the presence of a P-21 LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 5 of 8 P-1 Line #143 Volume 5 - 319 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8645 / Cyberspace Activities Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Cyberspace Activities Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 1.1.1) NAVIFOR INFOCON 3 - Security Compliance (32F) Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 2 2024 NAVY 1 0 1 1 2025 NAVY 1 0 1 A1 0 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 A1 0 1.1.3) NAVIFOR Persistent Cyber Training Environment (PCTE) node (55F1) 3 2024 NAVY 1 0 1 A O C T LI 8645 - Cyberspace Activities Navy 1 N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #143 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 320 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 8645 / Cyberspace Activities Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Cyberspace Activities Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.1) NAVIFOR INFOCON 3 - Security Compliance (32F) 2 2024 NAVY 1 1 0 1 2025 NAVY 1 1 0 1 2026 NAVY 1 0 1 1 2027 NAVY 1 0 1 Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 0 0 A1 0 A1 0 1.1.3) NAVIFOR Persistent Cyber Training Environment (PCTE) node (55F1) 3 2024 NAVY 1 1 0 0 O C T LI 8645 - Cyberspace Activities Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #143 M A R A P R M A Y J U N J U L A U G S E P Volume 5 - 321 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 07 / 5 P-1 Line Item Number / Title: 8645 / Cyberspace Activities Item Number / Title [DODIC]: 1 / Cyberspace Activities Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Naval Information Warfare Center (NIWC) Atlantic Charleston, SC TBD 2 NAVSUP - Norfolk TBD 3 Program Executive Office Orlando, FL TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8645 - Cyberspace Activities Navy UNCLASSIFIED Page 8 of 8 P-1 Line #143 Volume 5 - 322 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 0.000 1,007.643 0.000 1,007.643 0.000 1,007.643 159.138 159.138 159.138 765.711 - 0.000 - 765.711 - 0.000 - 765.711 0.000 765.711 765.711 765.711 1,389.050 1,389.050 1,389.050 1,161.171 1,161.171 1,161.171 1,936.376 1,936.376 1,936.376 To FY 2031 Complete 1,798.262 Continuing - Continuing - 1,798.262 Continuing - Total - Continuing - - 1,798.262 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 29.526 3.380 5.343 - 5.343 21.186 15.049 - - - 74.484 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: OPN-8 Budget Line Item (BLI) 9020 Spares and Repair Parts Budget provides funding to procure spare parts for systems and equipment budgeted in Budget Activities (BA) 01-07. This budget is a follow-on account, which supports End Item Hardware procurements. The OPN-8 BLI 9020 Spares and Repair Parts Budget is further broken down into the following sub-line items: (9020-10) Initial Spares: Spares procured by Naval Sea Systems Command (NAVSEA) Program Offices and other SYSCOMs to support newly procured hardware installations. This material may include, but is not limited to, Installation and Check out (INCO-I/INCO-R) Spares, On-Board Repair Parts (OBRPs), Maintenance Assistance Modules (MAMs), and Interim spares which provide support from installation to the Material Support Date (MSD) when the system moves to sustainment support. (9020-20) Coordinated Shipboard Allowance List (COSAL) Outfitting Spares: Spares consisting of materiel procured by the Navy Working Capital Fund (NWCF) to provide OBRPs for allowance increases in initial range and depth, maintenance and modernizations efforts, and configuration changes. Materiel procured is "bought out" by the OPN-8 account, enabling solvency within the NWCF. (9020-70) Lay-In Spares: Lay-In spares and Inventory Augmentation was previously addressed as part of 9020-20 and was broken out into 9020-70 beginning in FY23 in order to provide greater fidelity and address planning gaps. Lay-In spares consist of those spares which will be used to provide wholesale level support prior to MSD then transferred to NAVSUP WSS 90 days prior to materiel support date (MSD). Inventory Augmentation addresses current "holes on shelves" caused by underfunding spares in prior years. Collectively, 9020-70 ensures positive shelf health at MSD as well as solvency of the Navy Working Capital Fund which both directly support Fleet readiness. (9020-90) Vendor-Direct (Replenishment) Spares: Provides Appropriation Purchase Account (APA) material for planned equipment replacement programs and supports the depot level maintenance turnaround time and depot throughput capabilities. These programs are often referred to as "program office supported for life" and are broadly made up of programs not supported through the wholesale supply system and Navy Working Capital Fund. Programmatic examples include Presidential Helo, missiles, torpedoes, etc. Interim Spares are comprised of 9020-10 and 9020-90 collectively. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 1 of 16 P-1 Line #144 Volume 5 - 323 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 In addition to specific requirements identified above, the overall 9020 Spares and Repair parts budget supports special programs such as Q-COSAL range and depth repair parts, special tools, and other miscellaneous portable items necessary for operation, overhaul, and repair of reactor plant equipment for each nuclear-powered hull; and Gold Disk micro/miniature 2M repair. The OPN-8 Spares and Repair Parts BLI 9020 Spares and Repair Parts program does not fund Labor costs/Labor hours or Operating Space Items (OSI) material such as firefighting equipment as these are O&M,N funded. Spares requirements are inherently dynamic and adjust as operational conditions evolve. Supplier pricing updates, changes in Fleet installation and fielding schedules, refined system performance data from program offices, and shifts in maintenance timelines all influence spare-parts demand. As real-world failure data becomes available, execution-year requirements often differ from original estimates. These adjustments reflect improved accuracy and a more complete understanding of system behavior in Fleet operations. Variability within the spares account is an outcome of maturing data, evolving schedules, and continuous refinement of readiness requirements. The following budget lines directly support the amphibious warfare ship spares and repair parts: Cost Type # J0670: Other Navigation Equipment, Cost Type # J0933: LHA/ LHD Midlife, and Cost Type # J2981: In-Service Radars and Sensors. Amphibious requirements are also captured across several maritime Cost Type codes due to the nature of Navy resource management. Systems such as CANES (J2915) and CANES INTELL (J2925) are installed on all Naval vessels and centrally funded; therefore, installation requirements are submitted in combined documentation that includes submarines and surface ships. The Navy is developing improved reporting to provide clearer visibility into these cross-platform requirements. The FY 2026 spend plan for Spares and Repair Parts BLI 9020 includes $159,138 thousands of discretionary and $1,987,827 thousands of mandatory (reconciliation) for a total of $2,146,965 thousand. The mandatory funds partially fund Spares and Repair Parts BLI 9020. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 2 of 16 P-1 Line #144 Volume 5 - 324 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-18 OPN spares P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 1,007.643 - / 159.138 - / 765.711 / 0.000 - / 1,007.643 - / 159.138 - / 765.711 - / - - / 765.711 / 0.000 - / 765.711 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request supports essential spare and repair parts required to sustain fleet readiness, enable modernization efforts, and ensure the Navy can meet operational demands across all maritime and aviation platforms. Recent funding levels required the Navy to prioritize the most critical strategic deterrence, surface warfare, and aviation systems, ensuring continuity of operations for Ohio-class submarines, AEGIS combat systems, CIWS, SPY-6 radar, and Ford-class carrier launch and recovery systems. The FY 2027 investment builds on these priorities by restoring balanced support across the broader Fleet, including surface combatants, expeditionary forces, CVNs, amphibious platforms, and emerging modernization efforts such as LPD Flight II, DDG upgrades, NC3 systems, and key HM&E improvements. This funding enables the Navy to align spare-parts inventories with updated readiness models, support ongoing installations of cross-platform systems such as CANES, and meet outfitting and lay-in requirements for new and modernized ships. The FY 2027 request ensures the Fleet remains ready, resilient, and capable of meeting national defense objectives. The FY2027 base investments of $766M support increased outfitting surface spares funding based on refreshed readiness models for SWE critical systems for both surface combatants, expeditionary force units, and CVNs. These requirements are in addition to the initial, outfitting and lay-in requirements already existing for all platforms including EOD, Mine Countermeasures, submarine strategic deterrence outfitting, critical Nuclear Command, Control and Communications (NC3), SLQ-32, LPD Midlife LHA/D modernization, and first LPD FLT II ship, DDG Modernization, and AEGIS SPY 6 Advanced Radar System, MK 41 VLS, upgrades for DDG 51 Class HM&E. INITIAL/OUTFITTING/LAY-IN Spares (9020-10-20-70) J0200 / Surface Combatant HM&E - $0.861 million increase for DDG 51 Arleigh Burke-class destroyers the Fleet's most heavily tasked multi mission combatants, funding will be used to execute FY26 Surface Combatant HM&E tech refresh requirements including the DDG 51 Integrated Bridge Navigation System (IBNS) Tech Refresh, Machinery Control System (MCS) Tech Refresh, Engineering Control (EC) Tech Refresh, and Repair Station Console (RSC) Tech Refresh to ensure these systems are fully supported with the installation/lay in spares and onboard repair parts required during DDG Modernization availabilities. These upgrades directly support the Navy's requirement for safe navigation, reliable ship control, and resilient command and control in high threat environments, which is essential given the heightened operational tempo and the near daily missile, UAV, and proxy activity our deployed destroyers are encountering in the Middle East. J0670 / Other Navigation Equipment - $5.455 million request, no program growth. Line had $0.0M in FY26 discretionary spending. J0840 / Sub Periscope, Imaging and Supt Equipment - $0.287 million increase is a result of Reconciliation. The FY 2026 budget for Sub Periscope, Imaging and Supt Equip SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $287K from the FY 2026 total budget which consists of $0M in discretionary and $147K in mandatory (reconciliation) funding. FY 2027 funding will procure Lay-In spares and Inventory Augmentation for the Submarine Imaging, Electronic Warfare, and RADAR modernizations to all classes of submarines. J0840 / Sub Periscope, Imaging and Supt Equipment - $35.814 million increase is a result of Reconciliation. The FY 2026 budget for Sub Periscope, Imaging and Supt Equip SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $35.814M from the FY 2026 total budget which consists of $0M in discretionary and $9.531M in mandatory (reconciliation) funding. FY 2027 funding will procure On Board Repair Parts, Installation and Checkout Spares, and depot stock for Submarine Imaging, Electronic Warfare, and RADAR modernizations to all classes of submarines. The initial spares requirement and deployment load out is calculated via an OPNAV approved readiness based sparing model that identifies the minimum sparing level required to achieve USN mandated Operational Availability. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 3 of 16 P-1 Line #144 Volume 5 - 325 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J0900 / DDG Mod - $13.684 million increase for DDG 51 Arleigh Burke-class destroyers the Fleet's most heavily tasked multi mission combatants, funding will be used to procure installation/lay in spares and onboard repair parts for DDG MOD 2.0 systems including increased emergent AEGIS requirements added to FY27, IBNS, MCS UCC4/EC4/RSC4, GEDMS components, DVSS, SPQ 15 TI16, MK160 TI16, MORIAH Wind, SPA 25J Indicator Groups, MK6 MOD X, HES C, and SPY 6(V)4 backfit material to sustain newly installed capabilities during modernization availabilities. These spares directly support the Navy's requirement for reliable Integrated Air and Missile Defense and safe ship control, which is essential given the current global threat environment and the near daily missile, UAV, and proxy activity our deployed destroyers are encountering in real world air and missile defense, escort, and crisis response operations. The funding increase reflects prior sparing shortfalls, the accelerated pace of DDG modernization, and the expanded scope of FY26 requirements identified by Program Offices and N96 including significant growth in SPY 6 backfit, HES C, and TI16 related sparing needed to keep these ships fully mission capable in today's high tempo, high threat operating environment. J0920 / Outfitting COSAL - $145.015 million increase which is attributed to shortened Material Support Dates deliveries, significant increases to cost, and shifting installation and maintenance schedules. Previous underfunding to the Outfitting Account has led to requirements moving to FY27. COSAL outfitting spares are the first line of material defense against supply-related impacts to readiness, enhancing maritime operational availability, and ensuring resilient logistics in a denied environment. COSAL investment directly improves the Navy Supply System by stocking the shelves with long-lead items that are required to sustain the Fleet in a high-end fight. Increased Outfitting funding will reduce the backlog created from prior year shortfalls, ensure the availability of shelf stock at point-of-use onboard ships and submarines, and result in improved resilience, increased combat readiness, and sustained unit self-sufficiency. In addition, onboard spares requirements requiring OPN-8 funding are increasing due to Fleet operational needs to self-sustain at sea in response to current world events. As such, there have been various efforts to increase the resiliency of onboard spares via the Enduring Objective (EO) End-to-End Supply Chain WG to increase Readiness Based Sparing on the top Surface Warfare Enterprise weapon systems and the NAVSUP effort to increase the volume of onboard spares with historical demand profiles. J0930 / Wholesale Supply Inventory - $61.562 million increase is due to an increase in validated FY27 requirements attributed primarily to shifting installation schedules and MSD. In addition, previous underfunding to the Wholesale Supply Account has led to requirements moving to FY27. SUBLI 70 was created at the end of FY23 to separate Navy Inventory Augmentation, Wholesale Lay-in, and OSD Alternative to Forecasting initiative (Navy: Wholesale Inventory Optimization Model - WIOM) requirements from the Initial spare's requirements in SUBLI 10. SUBLI 70 / J9020 consists of requirements which are procured by the wholesale supply system (Inventory Augmentation and Alternative to Forecasting) SUBLI 70 / J0930 consists of requirements which are procured by the program office (Lay-in spares) and decapitalized to the wholesale supply system at the materiel support date (MSD). J0933 / LHA/LHD Midlife - $4.066 million increase will be used for procuring initial lay-in spares, OBRPs, INCOs, and MAMs to support LHA/LHD modernization of mission critical Hull Mechanical & Engineering (HM&E) systems including Main Feed Pump (MFP), Machinery Control Systems (MCS), Modular Refrigeration System (MRS), Power Management Platform (PMP), and Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA) - Phase II (P25). The Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) Modernization Program is required to upgrade the in-service LHA 6 and LHD 1 Class ships to keep the LHA and LHD Class relevant and operational. J0941 / Submarine Support Equipment - $0.652 million increase is a result of Reconciliation. The FY 2026 budget for Submarine Support Equipment included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $652K from the FY 2026 total budget which consists of $0M in discretionary and $8.223M in mandatory (reconciliation) funding. FY 2027 funding will procure Installation and Checkout Spares for the Interior Communications System (ICS)modernizations attack submarines. J0942 / Virginia Class Support Equipment - $1.305 million increase is a result of Reconciliation. The FY 2026 budget for Virginia Class Support Equipment included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $1.305M from the FY 2026 total budget which consists of $0M in discretionary and $2.944M in mandatory (reconciliation) funding. FY 2027 funds support procurement of spares to mitigate obsolescence for in-service VIRGINIA Class submarine Ship Control Systems (SCS). VIRGINIA Class Support Equipment spares align with year-by-year procurement quantities needed based on stock availability and component failure analysis to support modernization of configurations currently installed on SSNs 774-802. J0950 / Strategic Platform Support Equipment - $0.51 million increase is a result of Reconciliation. The FY 2026 budget for Strategic Platform Support Equip included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $57K from the FY 2026 total budget which consists of $0M in discretionary and $858K in mandatory (reconciliation) funding. FY27 funding supports the procurement of tactical Hull, Mechanical and Electrical (HM&E) equipment that will be installed aboard ships and in the facilities at the TRIDENT Refit Facilities (TRFs), Naval Shipyards (NSYs) and TRIDENT Training Facilities (TTFs). LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 4 of 16 P-1 Line #144 Volume 5 - 326 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J0977 / Underwater EOD Equipment - $0.997 million increase to procure lay-in spare and repair parts for critical UWEOD programs including EOD Diving Life Support Systems, and Maritime Expeditionary Mine Countermeasures (ExMCM) systems. These systems provide essential rapidly deployable operational capabilities to Joint and Naval forces. Increase ensures the operational availability and overall readiness of these capabilities. J0977 / Underwater EOD Equipment - $1.257 million increase to procure initial spare and repair parts for critical UWEOD programs including EOD Diving Life Support Systems, and Maritime Expeditionary Mine Countermeasures (ExMCM) systems. These systems provide essential rapidly deployable operational capabilities to Joint and Naval forces. Increase ensures the operational availability and overall readiness of these capabilities. J1601 / LCS MCM Mission Modules - $3.994 million increase to procure critical spares for support of delivery of Mission Packages 6-8 and providing critical lay-in spares for NAVSUP supported DLRs. J1601 / LCS MCM Mission Modules - $9.853 million increase to procure critical spares for support of delivery of Mission Packages 6-8 and providing critical lay-in spares for NAVSUP supported DLRs. J1611 / Small & Medium UUV - $3.868 million increase for MK19 program that has only 7 vehicles In Service supporting multiple risk reduction tests, Fleet training events, and sensor integration efforts in preparation for upcoming missions in FY27. Most of the critical spares have been consumed, the program needs to have a rotatable pool of spares to avoid cannibalization across the different systems, and many of these spares have a lead time up to 52 weeks. The program did not receive any funding in FY26, which exacerbates the need for availability of spares for these vehicles that will be converted and deployed to a torpedo tube launch and recovery (TTL&R) capable baseline configuration. The MK19 program will continue to operate with an extremely limited number of vehicles with high operational demand. Funds for spares will allow the program to procure parts before they become obsolete. These vehicles have a unique configuration which prevents the Navy from procuring within the current industrial base. Funding for initial spare parts is critical to operational readiness of Lionfish systems to be delivered in FY27 as part of Contract Option Year 2 deliveries. FY27 increase will support fleet-wide sustainment and operational availability of the Lionfish UUV, ensuring the ability of deploying units to conduct critical undersea missions. J1611 / Small & Medium UUV - $2.566 million increase for MK19 program that has only 7 vehicles In Service supporting multiple risk reduction tests, Fleet training events, and sensor integration efforts in preparation for upcoming missions in FY27. Most of the critical spares have been consumed, the program needs to have a rotatable pool of spares to avoid cannibalization across the different systems, and many of these spares have a lead time up to 52 weeks. The MK19 program will continue to operate with an extremely limited number of vehicles with high operational demand. Funds for spares will allow the program to procure parts before they become obsolete. These vehicles have a unique configuration which prevents the Navy from procuring within the current industrial base. J2136 / AN/SQQ-89 Surf ASW Cmbt Sys - $2.358 million increase, no program growth. FY26 had $0.0M in discretionary funding. J2150 / SSN Acoustic Equipment - $22.732 million increase is a result of Reconciliation. The FY 2026 budget for SSN Acoustic Equipment SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $22.732M from the FY 2026 total budget which consists of $0.0M in discretionary and $12.556M in mandatory (reconciliation) funding. FY 2027 funding will procure On Board Repair Parts and Installation and Checkout Spares for the Technology Insertion and weapon launcher modernizations to all classes of submarines. The initial spares requirement and deployment load out is calculated via an OPNAV approved readiness based sparing model that identifies the minimum sparing level required to achieve USN mandated Operational Availability of the Combat Control System as identified in OPNAVINST 3000.17. FY 2027 funding will procure On Board Repair Parts, Installation and Checkout Spares, and Interim spares for Towed Arrays, Acoustic Rapid COTS Insertions (ARCI), and Hull Sensor Systems including Lightweight Low Cost Conformal Array (LWLCCA) and Large Vertical Array (LVA). J2150 / SSN Acoustic Equipment - $4.863 million increase is a result of Reconciliation. The FY 2026 budget for SSN Acoustic Equipment SUBLI 70 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 70 is a net increase of $4.863M from the FY 2026 total budget which consists of $0.0M in discretionary and $2.685M in mandatory (reconciliation) funding. FY 2027 funding will procure Lay-in spares and End of Life procurements for Towed Arrays, Acoustic Rapid COTS Insertions (ARCI), and Hull Sensor Systems. J2176 / Undersea Warfare Support System - $1.298 million increase, no program growth. Line has Mandatory (Reconciliation) funding of $4.164M and $0.0M (Discretionary) in FY26. J2210 / Submarine Acoustic Warfare System - $0.276 million increase is a result of Reconciliation. The FY 2026 budget for Submarine Acoustic Warfare System (SAWS) SUBLI 70 included $0.0M of discretionary funding and $435K in mandatory. As a result, the FY 2027 budget for SUBLI 70 is a net increase of $276K from the FY 2026 total budget which consists of $0.0M in discretionary and $435 in LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 5 of 16 P-1 Line #144 Volume 5 - 327 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 mandatory (reconciliation) funding. Funding will support on contract the procurement of Compact Rapid Attack Weapon (CRAW) Common Weapon Launcher (CWL) lay-in spares to all necessary classes within the Fleet supported with this system J2210 / Submarine Acoustic Warfare System - $4.453 million increase is a result of Reconciliation. The FY 2026 budget for Submarine Acoustic Warfare System (SAWS) SUBLI 10 included $0.0M of discretionary funding and $201K in mandatory. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $4.453M from the FY 2026 total budget which consists of $0.0M in discretionary and $201K in mandatory (reconciliation) funding. Funding will support on contract Acoustic Device Countermeasures (ADC) MK3 and MK4 procurements of Initial Spares to all necessary classes within the Fleet supported with this system. J2213 / Surface Ship Torpedo Def (SSTD) - $0.292 million increase is a result of Reconciliation. The FY 2026 budget for Surface Ship Torpedo Defense (SSTD) SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $0.292M from the FY 2026 total budget which consists of $0.0M in discretionary and $0.0M in mandatory (reconciliation) funding. Funding will support on contract the procurement of AN/SLQ-25E (NIXIE) systems On Board Repair Parts (OBRP) Initial Spares to all necessary classes within the Fleet supported with this system. J2237 / SURTASS - $1.265 million increase is a result of Reconciliation. The FY 2026 budget for Surveillance Towed Array Sensor System (SURTASS) SUBLI 10 included $523K of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $1.265M from the FY 2026 total budget which consists of $523K in discretionary and $1.435M in mandatory (reconciliation) funding. Increase in funding will help procure and support SURTASS C4I Spares, Twin Line 29A Array Spares, and Japanese Auxiliary Oceanographic Surveillance (J-AOS) Integrated Common Processor (ICP) Spares. The increase in funding increases the quantity to be procured which can decrease unit costs. J2312 / AN/SLQ-32 - $1.026 million increase, no program growth -Line has Discretionary (Baseline) and Mandatory (Reconciliation) funding totaling $13.655M in FY26. J2360 / Shipboard IW Exploit - $53.738 million increase support sparing increasing requirements of systems contained within the SIW portfolio and their applicable ECPs to maintain pace with modernization and signal threats. Systems include SSEE Incr. E, SSEE Incr. F, and systems of a higher classification. J2361 / Maritime Battlespace Awareness - $1.288 million increase due to combining AIS and JTT funding in addition to unit cost increase for both AIS and JTT. J2437 / Battle Force Tactical Network - $3.502 million increase fund Carry Over requirements for OBRP, Depot Kits and Lay - In Spares from FY24/FY25 and Additional BRSE Shore requirements. J2606 / Cooperative Engagement Capabilities - $1.304 million increase, no program growth - Line has Mandatory (Reconciliation) funding of $12.459M in FY26. J2611 / Naval Tact Cmd Supt Sys (NTCSS) - $0.098 million increase required to support extended NTCSS timeline to procure out of date services for fleet support and MALS hardware system spares. J2614 / Adv Tact Data Link Sys (ATDLS) - $0.533 million increase to procure AS-4775B antenna INCO-I spares. Antenna supports advanced capability implementation for Link 16 Tactical Data Links. Funding supports first year implementation of the AS 4775B antenna and is consistent with the current procurement and installation schedules. J2657 / NAVSTAR GPS Receivers (Space) - $0.842 million increase due to each ADAP Antenna Price increase from $150K to $300K and an increase in installations. J2676 / Strategic Platform Support Equip - $0.766 million increase is a result of Reconciliation. The FY 2026 budget for Strategic Platform Support Equipment SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $766K from the FY 2026 total budget which consists of $0 in discretionary and $0 in mandatory (reconciliation) funding. FY27 funding supports the Naval Undersea Warfare Center (NUWC) Division Newport, TRIDENT Life Cycle Support Facility (LCSF). The LCSF contains a Legacy OHIO Class CCS/NPES suite and four Modernization CCS/NPES suites, consisting of all Tactical Subsystems. LCSF also houses two Subsystem Laboratories: Monitoring Development Laboratory (MDL) and Software Maintenance Laboratory (SML). FY requirement totals fluctuate due to changes in availability schedules, lab test events and anticipated material costs. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 6 of 16 P-1 Line #144 Volume 5 - 328 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J2820 / (Sub-Li 10-70) Ashore ATC Equipment - $5.445 million discretionary increase for spares funding (initial + lay-in) reflects the restoration and continuation of critical modernization and operational requirements to support the Navy, DoW and FAA mandated safety and cyber-security related upgrade of vulnerable and obsolete Ashore Air Traffic Control (ATC) communications, terminal navigation, and landing systems via Engineering Change Proposal (ECP) and new equipment fielding at Navy and Marine Corps airfields, worldwide. Acquisition of sufficient INCO, OBRP and Depot spares is a mandated prerequisite to installation and fielding of OPNAV approved Ashore ATC systems and upgrades. These requirements are mission critical for safe flight operations worldwide. J2830 / Ashore ATC Equipment - $0.929 million discretionary increase for spares funding (initial +lay-in) continues to support required system modifications to the AN/SPN-46 BLOCK V Phase 1 and AN/ SPN-46(V)6 / (V)8 systems. These systems (and required spares) are essential to maintaining the operational readiness, obsolescence mitigation, and safety of flight operations, ensuring it meets current and future mission requirements. J2876 / Naval Mission Planning Systems - $0.680 million increase; The FY 2026 request for Naval Mission Planning System (J2876) includes $0 millions of discretionary and $0.300 millions of mandatory (reconciliation) for a total of $0.300 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation funding will support hardware required to begin supporting the expansion of the Naval Mission Planning Systems footprint to units deployed aboard LHD/LHA Class ships, and HW Cost increases driven by the need for increased capability/functionality/connectivity associated with Collaborative Mission Planning Continuum. The FY 2027 discretionary increase of $0.680 million is required for hardware required to begin supporting the expansion of the Naval Mission Planning Systems footprint to units deployed aboard LHD/LHA Class ships, and HW Cost increases driven by the need for increased capability/functionality/connectivity associated with Collaborative Mission Planning Continuum. J2906 / (NAVAIR) Tactical/Mobile C4I System - $2.211 million discretionary increase; The FY 2026 request for ID Systems (J2906) includes $0 millions of discretionary and $0.415 million of mandatory (reconciliation) for a total of $0.415 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation FY2026 request funds the initial spares to support the P-8 Ground Station (PGS) and the Fly Away Kit (FAK), which are the essential ground-side architectures required for the P-8A Poseidon Increment 3 Block 2 fleet. The FY 2027 discretionary increase of $2.211 million is required to continue funding of initial spares to support the P-8 Ground Station (PGS) and the Fly Away Kit (FAK), which are the essential ground-side architectures required for the P-8A Poseidon Increment 3 Block 2 fleet. J2906 / (NAVWAR)Tactical/Mobile C4I System - $0.561 million increase is due to the need to support the initial outfitting of spares for the first (3) fieldings of the new TacMobile Increment 3.0. As the ground station for the P-8A, TacMobile supports Maritime Patrol and Reconnaissance Force (MPRF) Type Commander's ability to meet P-8A Global Force Management (GFM) commitments to Combatant Commanders, to complete the Anti-Submarine Warfare (ASW) kill chain while maintaining maneuver agility. Increase also includes DJC2 system enhancements and support centrally managed depot spares. DJC2 is the only fielded system that provides Combatant Commands & Component Commands (CCMDs/CCs) with a rapidly deployable C/JTF HQ capability that enables 3-Stars & 4-Stars to Command & Control their units for expeditionary operations. J2914 / Intelligence Surveillance and Reconnaissance (ISR) - $1.103 million increase due to realignment of ICOP and DCGS-N into one line which increases number of procurements/installations spares requirements need to support fleet readiness. J2915 / CANES - $26.755 million increase due to Vendor HW quotes increasing 300-400% year over year as well as newly added DMSMS forecast model requirements to support CANES modernization effort to include spares. J2925 / CANES Intell - $3.904 million increase due to Vendor HW quotes increasing and added DMSMS forecast model requirements to support CANES modernization effort to include SPARES. J2950 / Network Tactical Common Data Link (CDL) - $5.483 million increase due to accelerated fielding on CVN 76; increased costs associated with supply chain challenges and complex antenna technology; Lay -In Spares required by MSD in April 2029. INCO's used from production assets in FY24: including QTY 1 - On Link Deck Subsystem and QTY 1 - Common Data Link RTM. J2960 / Integ Combat System Test Facility - $0.297 million to procure Spares for Shipboard Electronic Systems Evaluation Facility (SESEF) Electronic Equipment upgrades and modernizations. J2980 / Items less than $5 Million - $2.637 million increase, no program growth Line had $0.0 in discretionary funding in FY26. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 7 of 16 P-1 Line #144 Volume 5 - 329 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J2981 / In-Service Radars and Sensors - $1.878 million increase, no program growth - Reconciliation funding incongruence zeroed out the line. Line has Mandatory (Reconciliation) funding of $6.321M in FY26. J3010 / Shipboard Tactical Comms - $0.321 million increase to support rapid deployment of new technology to replace aging UHF technology outfitting. J3050 / Ship Communications Automation - $6.287 million increase to support the ADNS Afloat Agile Enclave (AE), to include cybersecurity upgrades, increased networking capability, and ADNS Shore Modernization at multiple shore sites. Increase will also provide sufficient funding for the STACC modernization efforts at critical Navy shore and MOC facilities, and the expanding footprint for Resilient C2 services out to dozens of Carrier Task Force (CTFs) and Joint Task Force (JTFs) activities. J3057 / Communications Items under $5M - $0.486 million increase due to Lay - In Spares for AMPHIB COMMS VRC-250 and increase number of installations. J3107 / Submarine Broadcast Support - $1.142 million increase to support the initial outfitting of spares for the initial fielding of the Scorpion and HEMPSS/TACAMO Programs, as well as sustainment for aging shore antenna systems that connect the U.S. submarine fleet to the National Command Authority. SCORPION is a Mobile, rapidly deployed, high altitude electromagnetic pulse (HEMP) protected communications suite; spares lists/INCOs are developed by contract as a CDRL and will be ready for procurement by FY27. FSBS HPTE is a sustainment program responsible for ongoing end-of-life / obsolescence replacement efforts that will modernize infrastructure and information systems at critical submarine C3 sites. J3130 / Submarine Communication Equipment - $0.927 million increase due to addition of new PSDs for new builds for FY27 will add to INCO and lay-in spares costs, as many components have a lead time of up to two years or more. Cost increases for Antenna Systems/Special Comms systems (BRR-6, BST-1) have increased during the FYs when lay-in spares will be procured J3215 / Satellite Communications Systems - $2.292 million increase due to StTNG INC II Inventory Objective increased from QTY 177 to 382. Increase in INCO -R Kits due to additional electronic equipment being added to the StTNG system configuration to include server and hard drives. Depot Kit increased from 1.6K to 49K per kit and INCO-R increased from 1.6K to 65.9K per kit. GBS inducted a new AN/ USR-10C(V)) system that will require lay - In spares in 2027. J3216 / Navy Multiband Terminal (NMT) - $0.793 million increase due to NMT-X Follow on Production Contract that addresses system obsolescence with all components being redesigned and require OBRP's, INCO, and Depot spares for NMT SLE MOD. J3415 / Info Systems Security Program (ISSP) - $0.813 million increase primary driver for the funding increase in is the SHARKCAGE Afloat Suite 2.0 program. This is due to a planned system redesign in FY26, which deferred the bulk of spare parts procurement to the following year. The increase in FY27 is a direct result of the procurement of spares for the new system, including a new allocation for On Board Repair Parts (OBRP) and a increase in funding for Depot and lay - In spares. The increase also represents Computer Network Defense (CND) across all sites for each PSD line identified J3620 / Coast Guard Equipment - $0.798 million increase, no program growth. Line has Mandatory (Reconciliation) funding of $4.720M in FY26. J4204 / Weapons Range Support Equipment - $6.219 million increase; The FY 2026 request for Weapons Range Support Equipment (J4204) includes $0 millions of discretionary and $0.500 millions of mandatory (reconciliation) for a total of $0.500 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information regarding this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation funding will support procurement of initial spares to be delivered with the TCTS ground systems on which the Fleet can monitor and or later watch aircrew training exercises. The Ground systems, which are portable and fixed, are portable for use on carriers and other locations along with fixed ones located at the training ranges. This instrumentation is maintained by an O&M contractor (CLS) at the ranges. The FY 2027 discretionary increase of $6.219 million in spares funding continues to support the SRAM (System Replacement and modernization), EW (Electronic warfare) and OS (Ocean Systems) projects for Training Range instrumentation/systems. These initial spares are to be delivered with the installation of this training range instrumentation in FY27 to the training ranges. The training range systems instrumentation is maintained by O&M contractors (CLS) at the ranges. J4213 / (Sub-Li 10-70) Aircraft Support Equipment - $6.369 million increase supports procurement of critical initial and lay-in spare parts for the Long-Term Display (LTD), Digital ILARTS (DILARTS), and White High Power Floodlight systems. This funding is essential to establish a robust supply chain supporting the LTD deployment on CVN-77 and to provide initial spares for new DILARTS installations on CVNs 71, LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 8 of 16 P-1 Line #144 Volume 5 - 330 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 77, and 78, ensuring these launch and recovery visualization systems are fully supportable during deployment. Additionally, this increase will fund lay-in spares for high-power floodlights to support flight deck maintenance and safety. This investment is critical to enhancing resiliency, improving combat readiness, and strengthening the self-sufficiency of the fleet by ensuring mission-critical components are available to maintain operational readiness. FY 2027 funding will also provide for initial and follow-on spares funding supports the procurement of the A/F32K-1A Weapons Assembly Table Replacement, which consists of interchangeable tables for bomb assembly. Funding also provides sparing for the Forward Arming and Refueling Points (FARPs) Ordnance Loading Support Equipment, an unmanned USMC vehicle designed to transport pre-assembled munitions to forward locations. Lastly, the sparing procurement of the HLU-288/E/HLU-196 Bomb Hoist Replacement will reduce aircraft re-arming time and decrease operator fatigue. J4217 / Advanced Arresting Gear (AAG) - $1.446 million increase; The FY 2026 request for ID Systems (J4217O) includes $0 million of discretionary and $46.812 million of mandatory (reconciliation) for a total of $46.812 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information regarding this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation funding will support procurement of a lay-in ratable pool of spare parts, as identified via AAG critical items list, to support depot level repair and overhaul work beginning with CVN-78 first extended maintenance availability, Drydocking Planned Incremental Availability (DPIA) in FY29. The DPIA for CVN-78 will overlap with CVN-79 Planned Incremental Availability (PIA) in FY30. Both ships will be past their Obligation Work Limited Date (OWLD), with a significant amount of depot level repair and overhaul work expected to return the systems to a fully mission capable state. Depot level inspections during planned availability are anticipated to drive significant demand spikes. Average lead times for components are on average 18-36 months. The FY 2027 discretionary increase of $1.446 million supports procurement of a lay-in ratable pool of spare parts, as identified via AAG critical items list, to support depot level repair and overhaul work beginning with CVN-78 first extended maintenance availability, Drydocking Planned Incremental Availability (DPIA) in FY29. The DPIA for CVN-78 will overlap with CVN-79 Planned Incremental Availability (PIA) in FY30. Both ships will be past their Obligation Work Limited Date (OWLD), with a significant amount of depot level repair and overhaul work expected to return the systems to a fully mission capable state. Depot level inspections during planned availability are anticipated to drive significant demand spikes. Average lead times for components are on average 18-36 months. J4226 / Meteorological Equipment - $3.713 million increase is to buy INCO R spares and Depot spares across the METOC portfolio to procure spares required to sustain an aging and larger glider population required to meet annual mission requirements. J4248 / Airborne MCM - $0.348 million increase supports modifications, product improvements, and engineering change proposals (ECPs) of the AN/AES-1 Airborne Laser Mine Detection System (ALMDS) and AN/ASQ-235 Airborne Mine Neutralization System (AMNS) Launch and Handling System (LHS). Flight hours for ALMDS and AMNS are expected to increase due to these systems replacing the legacy systems. Both AMCM systems entered service in 2017, and several components have been identified for replacement due to obsolescence. Replacement will improve reliability, availability, and performance. In addition to the ongoing ECPs and modernization of the ALMDS Automatic Target Recognition (ATR) algorithm, ALMDS is refurbishing its Laser Transmitter Unit (LTU) coolant O-rings. This repair requires all 29 LTUs to undergo refurbishments. J4248 / Airborne MCM - $0.003 million increase supports the Lay In requirements for ECP's for ALMDS and AMNS. J4268 / (Sub-Li 10-70) Aviation Support Equipment - $5.642 million increase supports continued spares procurements related to Hearing Protection Helmets Full Rate Production Phase 4, Helmet, Mask, Regulator (HMR) and addition of Improved Joint Helmet Mounted Cueing System (IJHMCS) commencing in FY27. This increase will establish a robust supply chain that meets the operational readiness requirements of the IJHMCS, HPH, and HMR devices in support of Fixed-Wing and Rotary Wing/Tilt Rotor pilots, aircrew, and maintainers. Addresses anticipate material requirements and establish proper spares stock levels to support mission priorities. This increase will improve resiliency, increase combat readiness, and enhance self-sufficiency. J4269 / (Sub- Li 10-70) UMCS- Unman Carrier Aviation (UCA) Mission Cntrl Stn- $10.004 million increase commensurate with CVN and ashore based site standup schedule. This ensures both CVN and ashore based sites are capable to deploy with requisite spares to support operational deployments. The increase also includes Commercial Off the Shelf (COTS) electronics price increases, previously unknown due to data maturity and increases in supply chain cost. The spares procured for Unmanned Carrier Aviation Mission Control System (UMCS/MDCX) will be used to maintain the readiness of the UMCS, as well as supporting MQ-25A. The UMCS program is the system-of-systems required for MQ-25 vehicle and payload control, both shipboard and shore based. The UMCS consists of all ground and ship-based hardware, software, and networks associated with the planning and execution of flight operations and tactical missions, including the control stations (displays, computers, and servers), line of sight communications, and beyond line-of-sight satellite communications. These end items are imperative to fulfill the organic CVN tanking role. J5111 / Ship Gun System Equipment - $0.144 million increase, no program growth. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 9 of 16 P-1 Line #144 Volume 5 - 331 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J5231 / Ship Missile Support Equipment - $7.405 million increase, no program growth - Reconciliation funding incongruence zeroed out the line. Line has Mandatory (Reconciliation) funding of $9.686M and $0.0M (Discretionary) in FY26. J5231 / Ship Missile Support Equipment - $5.120 million increase, no program growth - Line has Mandatory (Reconciliation) funding of $10.850M in and $0.0M (Discretionary) in FY26. J5420 / SSN Combat Control System - $2.997 million increase is a result of Reconciliation. The FY 2026 budget for SSN Combat Control Systems SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $2.997M from the FY 2026 total budget which consists of $0.0M in discretionary and $5.185M in mandatory (reconciliation) funding. FY 2027 funding will procure On Board Repair Parts and Installation and Checkout Spares for the Technology Insertion and weapon launcher modernizations to all classes of submarines. The initial spares requirement and deployment load out is calculated via an OPNAV approved readiness based sparing model that identifies the minimum sparing level required to achieve USN mandated Operational Availability of the Combat Control System as identified in OPNAVINST 3000.17. J5509 / EOD Equipment - $0.035 million increase provides critical spares in support of operational readiness and mission success through two key initiatives: (1) supporting the transition to the new AN/PLT-6 system, and (2) addressing JCREW system maintenance challenges through increased Jammer Core spares and JCREW 2.0 upgrade components. J5509 / EOD Equipment - $0.027 million increase provides critical spares in support of MTRs II spare parts. J6024 / Construction & Maint Equip - $1.571 million increase in initial spares supports increased OPTEMPO of Naval Expeditionary forces. Initial spares are in support of construction and maintenance equipment used by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. J6024 / Sub LI 70 Construction & Maintenance Equipment - $0.639 million increase in lay-in spares supports initial stocking levels for the Navy Supply System in support of spares required by the Naval Expeditionary forces. Expeditionary forces supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. J6028 / Sub LI 10 Tactical Vehicles - $2.894 million increase in initial spares supports increased OPTEMPO of Naval Expeditionary forces. Initial spares are in support of tactical vehicles used by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities J6028 / Sub LI 70 Tactical Vehicles - $2.005 million increase in lay-in spares supports initial stocking levels for the Navy Supply System in support of spares required by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. J6060 / Sub LI 10 Items Less than $5Million - $1.619 million increase in initial spares supports increased OPTEMPO of Naval Expeditionary forces. Initial spares are in support of special purpose vehicles used by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. J6060 / Sub LI 70 Items Less than $5Million - $1.356 million increase in lay-in spares supports increased OPTEMPO of Naval Expeditionary forces. Initial spares are in support of special purpose vehicles used by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 10 of 16 P-1 Line #144 Volume 5 - 332 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J9501 / Spares for Rolling Stock - $0.138 million increase in initial spares supports increased OPTEMPO of Naval Expeditionary forces. Initial spares are in support of rolling stock used by the Naval Expeditionary forces. The Expeditionary units supported are Naval Construction Force, Naval Expeditionary Logistics Forces, Naval Special Warfare, Expeditionary Naval Medical Units, Explosive Ordinance Disposal, Maritime Security Force, and Naval Beach Group. This increase addresses anticipated material requirements and established proper spares stock levels to support mission priorities. J8120 / C4ISR Equipment - $2.914 million increase to procure additional equipment to be delivered to and supported by the supply activities at Expeditionary Groups to plus up the range/scope of their inventory to support DoW missions. J8120 / C4ISR Equipment - $1.597 million increase to procure and deliver OBRPs to support thousands of tactical radios being delivered to NECC groups. As well as supporting (8) additional planned EDNTactical Operations Center (EDN-T) systems, and (50) ETAK systems, being delivered to Expeditionary units. J8128 / Physical Security Equipment - $0.002 increase will be to procure additional AN/PVS-31B BNVG night vision devices in support of the fleet. J9020 / Spares and Repair Parts - $1.963 million increase to procure spares for systems and equipment budgeted in Budget Activities (BA) 01-07. J9924 / J9925 Spares for NAVSEA/NAVFAC (For NAVSEA/NAVFAC special programs) $3.740 million increase needed for certification and re-certification of warfighters to ensure proficiency and enhance repair capability of miniature and micro-miniature circuitry while applying new self-sufficiency technologies at the shipboard and intermediate level. This function and technology include the ability to support warfighting value, competency and system restoration related to circuit card troubleshooting test routines using Advanced Diagnostic Test Systems (ADTS). ADTS enables the maintenance and repair of electronic assemblies even without the availability of technical data, such as in the case of obsolete or aging weapon systems that have little to no original equipment manufacturer (OEM) support. Gold Disk Implementation in FY25 resulted in $33.6M of cost avoidance, 8,010 repairs and 253 CASREPS averted/corrected. This increase is the result of PB26 discretionary spending being moved to mandatory. Replenishment Spares (9020-90) J0840 / Sub Periscope, Imaging and Supt Prog - $7.477 million increase is a result of Reconciliation. The FY 2026 budget for Sub Periscope, Imaging and Supt Equip SUBLI 10 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 10 is a net increase of $7.477M from the FY 2026 total budget which consists of $0M in discretionary and $14.862M in mandatory (reconciliation) funding. FY 2027 funding will procure Replenishment spares for the Submarine Low Profile Photonics Masts to support the depot level maintenance turnaround time and depot throughput capabilities. J0950 / Strategic Platform Support Equip - $12.630 million increase is a result of Reconciliation. The FY 2026 budget for Strategic Platform Support Equipment SUBLI 90 included $0.0M of discretionary funding. As a result, the FY 2027 budget for SUBLI 90 is a net increase of $12.630M from the FY 2026 total budget which consists of $0 in discretionary and $0 in mandatory (reconciliation) funding. FY27 funding will procure TRIPER (TRIDENT Planned Equipment Replacement) Program Rotatable Pool assets. J1600 / LCS Common Mission Modules Equipment - $1.702 million increase to purchase MPCE/MVCS spares. J1603 / LCS SUW Mission Modules - $2.126 million increase to purchase MK46 GWS spares. J2150 / SSN Acoustic Equipment - $23.348 million increase is a result of Reconciliation. The FY 2026 budget for SSN Acoustic Equipment SUBLI 90 included $33.257M of discretionary funding. As a result, the FY 2027 budget for SUBLI 90 is a net increase of $23.348M from the FY 2026 total budget which consists of $0.0M in discretionary and $33.257M in mandatory (reconciliation) funding. FY 2027 funding will procure replenishment spares for Towed Arrays and Hull Sensor Systems. J2210 / Submarine Acoustic Warfare System - $2.667 million increase is a result of Reconciliation. The FY 2026 budget for Submarine Acoustic Warfare System (SAWS) SUBLI 90 included $13.034M of discretionary funding. As a result, the FY 2027 budget for SUBLI 90 is a net increase of $2.667M from the FY 2026 total budget which consists of $0.0M in discretionary and $13.034M in mandatory (reconciliation) funding. Funding will support the procurement of On-Board Repair Parts (OBRP) necessary for Acoustic Augmentation Support Program (AASP) to all necessary classes within the Fleet supported with this system. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 11 of 16 P-1 Line #144 Volume 5 - 333 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 08: Spares and Repair Parts / BSA 1: Spares 9020 / Spares and Repair Parts And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 J2237 / SURTASS - $8.408 million increase is a result of Reconciliation. The FY 2026 budget for Surveillance Towed Array Sensor System (SURTASS) SUBLI 90 included $0 of discretionary funding. As a result, the FY 2027 budget for SUBLI 90 is a net increase of $8.408M from the FY 2026 total budget which consists of $0K in discretionary and $13.897M in mandatory (reconciliation) funding. The FY27 funding supports Surveillance Towed Array Sensor System (SURATSS) Replenishment Spares. A decrease in funding results in degradation of support and number of Spares procured to SURTASS Shipboard Material Spares, Twin Line 29A Array Spares, Towed Array Telemetry Spares, Compact Low Frequency Active (CLFA) Spares, SURATSS C4I Spares, and Japanese Auxiliary Oceanographic Surveillance (J-AOS) Integrated Common Processor (ICP) Spares. The decrease in funding will reduce the quantity to be procured and increase unit costs. Decreased control further strains on hand inventory availability affecting mission availability. J2360 / Shipboard IW Exploit - $0.593 million increase to support sparing requirements of systems contained within the SIW portfolio and their applicable ECPs to maintain pace with modernization and signal threats. J2622 / Minesweeping System Replacement - $1.674 million increase supports sustainment of the SQQ-32 system. J2906 / (NAVAIR)Tactical/Mobile C4I Systems - $2.225 million increase; The FY 2026 request for Tactical /Mobile C4I Systems (NAVAIR) (J2906) includes $0 millions of discretionary and $2.585 millions of mandatory (reconciliation) for a total of $2.585 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation request for FY 2026 funds is to procure critical high failure component spares to sustain the P-8 Ground Station (PGS) and Fly Away Kit (FAK). The FY 2027 discretionary increase of $2.225 million supports procurement of additional long lead material for the replenishment spares kits and for updated costs from the vendors. The increase will also support the procurement of high failures on our combat system hardware and support additional sparing at OCONUS sites where our systems are required. As P-8 Ground Station (PGS) and Fly Away Kit (FAK) are finalizing development and testing and moving towards production, vendors have added additional components to bill of materials, provided increased costs for hardware based on production schedule and replenishment spares need. funds critical high failure component spares to sustain the P-8 Ground Station (PGS) and Fly Away Kit (FAK). J2906 / (NAVWAR) Tactical/Mobile C4I Systems Increase ISO addition of Lay-in spares. J4226 / Meteorological Equipment - $0.414 million increase to procure INCO R spares to support the NIMS program and Depot spares to support the HWDDC programs. J4248 / Airborne MCM - $4.592 million increase used to improve the readiness of the ALMDS and aid in building a ratable pool of several components to mitigate depot repair and maintenance delays caused by extended lead times. J5111 / Ship gun systems Equipment - $3.170 million increase, no program growth. J5253 / Tomahawk Support Equipment - $0.588 million increase; The FY 2026 request for Tomahawk Support Equipment (J5253) includes $0 millions of discretionary and $0.117 millions of mandatory (reconciliation) for a total of $0.117 million. The mandatory funds partially fund Spares and Repair Parts BLI 9020. Further information regarding this reconciliation request is provided in Section 20002 (Shipbuilding) and Section 20010 (Readiness) of the Reconciliation Exhibit. Reconciliation funding will support necessary costs for additional servers, workstations, switches, tape drives, and support hardware. This supports sparing requirements and is driven by the establishment of additional sites, both to enable their setup and to maintain ongoing operations for fleet support. The FY 2027 discretionary increase of $0.588 million covers the necessary costs for additional servers, workstations, switches, tape drives, and support hardware. This supports sparing requirements and is driven by the establishment of additional sites, both to enable their setup and to maintain ongoing operations for fleet support. J5358 / Strategic Missile System Equipment - $5.276 million increase from FY 2026 to FY 2027 due to FY 2026 reprioritization of Navy resources to meet emergent requirements, FY 2027 funding restores required Strategic Systems Programs spares funding to meet the needs of the Trident II D5LE Strategic Weapons System. J5429 / ASW Support Equipment - $1.667 million request, no program growth. LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 12 of 16 P-1 Line #144 Volume 5 - 334 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 08 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 9020 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: OPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) Initial BA 01 - Ships Support Equipment 0200 / Surface Combatant HM&E - 38.053 - 0.861 - 0670 / Other Navigation Equipment 0840 / Sub Periscope, Imaging and Supt Equip Prog - 8.302 - 52.565 0900 / DDG Mod - 10.335 0920 / Outfitting-COSAL - 257.278 0930 / Wholesale Supply Inventory - 0.236 0933 / LHA/LHD Midlife - 0.342 0941 / Submarine Support Equipment - 0942 / Virginia Class Support Equipment 0.861 - 5.455 - 5.455 - 36.101 - 36.101 0.173 13.857 - 13.857 132.549 277.564 - 277.564 - 61.562 - 61.562 - 4.066 - 4.066 45.000 - 0.652 - 0.652 - - - 1.305 - 1.305 0947 / DDG 1000 Class Support Equipment - 5.033 - 0.000 - 0.000 0950 / Strategic Platform Support Equip - - - 0.051 - 0.051 0977 / Underwater EOD Equipment - 0.357 - 2.254 - 2.254 1600 / LCS Common Mission Modules Equipment - 12.369 - 0.000 - 0.000 1601 / LCS MCM Mission Modules - 3.846 - 13.847 - 13.847 1611 / Small & Medium UUV - 8.681 - 6.434 - 6.434 2026 / SPQ-9B Radar - 0.347 - 0.000 - 0.000 2136 / AN/SQQ-89 Surf ASW Cmbt Sys - 3.693 - 2.358 - 2.358 2150 / SSN Acoustic Equipment - 26.949 - 27.595 - 27.595 2176 / Undersea Warfare Support Equipment - - - 1.298 - 1.298 2210 / Submarine Acoustic Warfare System - 1.484 - 4.729 - 4.729 2213 / Surface Ship Torpedo Def (SSTD) - 0.399 - 0.292 - 0.292 2237 / SURTASS - 2.867 0.523 1.788 - 1.788 2312 / AN/SLQ-32 - 125.386 10.200 11.226 - 11.226 2360 / Shipboard IW Exploit - 46.372 - 53.738 - 53.738 2361 / Maritime Battlespace Awareness - 1.888 - 1.288 - 1.288 2437 / Battle Force Tactical Network - 1.300 - 3.502 - 3.502 2606 / Cooperative Engagement Capability - 60.158 - 1.304 - 1.304 2611 / Naval Tact Cmd Supt Sys (NTCSS) - 0.123 0.010 0.098 - 0.098 2614 / Adv Tact Data Link Sys (ATDLS) - 1.782 0.221 0.754 - 0.754 BA 02 - Communications & Electronics Equip LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 13 of 16 P-1 Line #144 Volume 5 - 335 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 08 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 9020 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: OPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) 2657 / NAVSTAR GPS Receivers (Space) - 4.514 0.147 0.989 - 0.989 2676 / Strategic Platform Support Equip - 0.735 - 0.766 - 0.766 2820 / Ashore ATC Equipment - 0.649 - 5.445 - 5.445 2830 / Afloat ATC Equipment - 9.164 - 0.929 - 0.929 2876 / Naval Mission Planning Systems - 0.345 - 0.680 - 0.680 2900 / Maritime Integrated Broadcast System - 0.235 0.015 0.000 - 0.000 2906 / Tactical/Mobile C4I Systems - 3.348 0.067 2.839 - 2.839 2914 / Intelligence Surveillance and Reconnaissance (ISR) - 0.206 0.635 1.738 - 1.738 2915 / CANES - 9.526 0.273 27.028 - 27.028 2925 / CANES Intell - 1.552 - 3.904 - 3.904 2950 / Network Tactical Common Data Link (CDL) - 2.737 - 5.483 - 5.483 2960 / Integ Combat System Test Facility - 0.333 - 0.297 - 0.297 2980 / Items less than $5 Million - 39.215 - 2.637 - 2.637 2981 / In-Service Radars and Sensors - 2.304 - 1.878 - 1.878 3010 / Shipboard Tactical Comms - 0.740 0.045 0.366 - 0.366 3050 / Ship Communications Automation - 2.353 0.567 6.854 - 6.854 3057 / Communications Items under $5M - 0.692 0.002 0.488 - 0.488 3107 / Submarine Broadcast Support - 0.948 - 1.142 - 1.142 3130 / Submarine Communication Equipment - 1.650 0.102 1.029 - 1.029 3215 / Satellite Communications Systems - 1.178 0.275 2.567 - 2.567 3216 / Navy Multiband Terminal (NMT) - 0.934 0.319 1.112 - 1.112 3415 / Info Systems Security Program (ISSP) - 0.890 0.054 0.867 - 0.867 3620 / Coast Guard Equipment - 6.794 - 0.798 - 0.798 4204 / Weapons Range Support Equipment - 8.693 2.062 8.281 - 8.281 4213 / Aircraft Support Equipment - 3.026 1.728 8.097 - 8.097 4217 / Advanced Arresting Gear (AAG) - 6.552 - 1.446 - 1.446 4226 / Meteorological Equipment - 0.146 0.413 4.126 - 4.126 4248 / Airborne MCM - 0.298 - 0.351 - 0.351 4268 / Aviation Support Equipment - 1.279 2.025 7.667 - 7.667 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn - 3.977 - 10.004 - 10.004 BA 03 - Aviation Support Equipment BA 04 - Ordnance Support Equipment LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 14 of 16 P-1 Line #144 Volume 5 - 336 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 08 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 9020 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: OPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) 5111 / Ship Gun Systems Equipment - 0.100 - 0.144 - 0.144 5231 / Ship Missile Support Equipment - 32.878 - 12.525 - 12.525 5420 / SSN Combat Control Systems - 2.865 0.801 3.729 - 3.729 5509 / EOD Equipment - 1.498 - 0.062 - 0.062 5530 / Anti-ship Missile Decoy System - 3.375 - 0.000 - 0.000 5664 / Surface Training Equipment - 2.172 - 0.000 - 0.000 6024 / Construction & Maint Equip - 2.190 0.400 2.610 - 2.610 6028 / Tactical Vehicles - 0.538 0.260 5.159 - 5.159 6033 / Amphibious Equipment - 0.428 - 0.000 - 0.000 6060 / Items less than $5 Million - 2.072 0.508 3.483 - 3.483 9501 / Spares for Rolling Stock - 0.566 - 0.138 - 0.138 8120 / C4ISR Equipment - 0.602 0.565 5.076 - 5.076 8128 / Physical Security Equipment - 0.179 - 0.002 - 0.002 8161 / Enterprise Information Technology - 0.085 0.020 0.017 - 0.017 8164 / Next Generation Enterprise Service - 1.147 - 0.000 - 0.000 9020 / Spares and Repair Parts - 29.526 3.380 5.343 - 5.343 9924 / Spares for NAVSEA ( For NAVSEA special programs) - 1.798 - 3.342 - 3.342 9925 / Spares for NAVFAC (for NAVFAC special programs) - 0.258 - 0.398 - 0.398 - 912.435 685.815 - 685.815 0840 / Sub Periscope, Imaging and Supt Equip Prog - 8.512 - 7.477 - 7.477 0942 / Virginia Class Support Equipment - 12.194 - 0.000 - 0.000 0950 / Strategic Platform Support Equip - 10.157 - 12.630 - 12.630 1600 / LCS Common Mission Modules Equipment - 1.736 - 1.702 - 1.702 1603 / LCS SUW Mission Modules - 1.000 - 2.126 - 2.126 2150 / SSN Acoustic Equipment - 23.777 - 23.348 - 23.348 2210 / Submarine Acoustic Warfare System - 2.046 - 2.667 - 2.667 BA 05 - Civil Engineering Support Equip BA 07 - Personnel & Command Support Equip BA 08 - Spares and Repair Parts Subtotal: Initial 158.339 Replenishment BA 01 - Ships Support Equipment BA 02 - Communications & Electronics Equip LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 15 of 16 P-1 Line #144 Volume 5 - 337 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 08 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 9020 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: OPN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) 2213 / Surface Ship Torpedo Def (SSTD) - 0.278 - 0.000 - 0.000 2237 / SURTASS - 10.734 - 8.408 - 8.408 2360 / Shipboard IW Exploit - 3.324 0.443 1.036 - 1.036 2622 / Minesweeping System Replacement - 2.139 - 1.674 - 1.674 2906 / Tactical/Mobile C4I Systems - - - 2.225 - 2.225 4226 / Meteorological Equipment - 0.251 0.048 0.462 - 0.462 4248 / Airborne MCM - 5.296 - 4.592 - 4.592 5111 / Ship Gun Systems Equipment - 6.479 - 3.710 - 3.710 5253 / Tomahawk Support Equipment - 0.458 - 0.588 - 0.588 5358 / Strategic Missile Systems Equip - 3.951 0.308 5.584 - 5.584 5420 / SSN Combat Control Systems - 0.361 - 0.000 - 0.000 5429 / ASW Support Equipment - 2.515 - 1.667 - 1.667 BA 03 - Aviation Support Equipment BA 04 - Ordnance Support Equipment Subtotal: Replenishment - 95.208 0.799 79.896 - 79.896 Total Cost (Initial + Replenishment) - 1,007.643 159.138 765.711 - 765.711 LI 9020 - Spares and Repair Parts Navy UNCLASSIFIED Page 16 of 16 P-1 Line #144 Volume 5 - 338