=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 4 of 5 Other Procurement, Navy Budget Activity 04 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activity 01............................................................................................................................................................. Volume 1 Budget Activity 02............................................................................................................................................................. Volume 2 Budget Activity 03............................................................................................................................................................. Volume 3 Budget Activity 04............................................................................................................................................................. Volume 4 Budget Activities 05-08.....................................................................................................................................................Volume 5 UNCLASSIFIED Volume 4 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 4 Table of Contents Cost of Report............................................................................................................................................................. Volume 4 - v Introduction and Explanation of Contents..............................................................................................................Volume 4 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 4 - ix Master Line Item Table of Contents (by Appropriation then Line Number)...........................................................Volume 4 - li Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................. Volume 4 - lxi Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 4 - lxix Line Item Table of Contents (Alphabetically by Line Item Title)......................................................................... Volume 4 - lxxi Executive Summary...............................................................................................................................................Volume 4 - lxxiii Exhibit P-40s................................................................................................................................................................ Volume 4 - 1 UNCLASSIFIED Volume 4 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - iv === page 7 === OPN 1 OPN 2 OPN 3 OPN 4 OPN 5-8 The estimated cost of this report for the Department of the Navy (DON) is $58,268. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $58,268 The estimated cost of this report for the Department of the Navy (DON) is $100,759. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $100,759 The estimated cost of this report for the Department of the Navy (DON) is $23,118. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $23,118 The estimated cost of this report for the Department of the Navy (DON) is $38,526. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $38,526 The estimated cost of this report for the Department of the Navy (DON) is $29,304. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $29,304 Volume 4 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - vi === page 9 === Department of Defense Appropriations Act, 2027 Other Procurement, Navy For procurement, production, and modernization of support equipment and materials not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships, and ships authorized for conversion); the purchase of passenger motor vehicles for replacement only; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $18,866,679 to remain available for obligation until September 30, 2029, of which $0 shall be available for the Navy Reserve and the Marine Corps Reserve: Provided, That such funds are also available for the maintenance, repair, and modernization of ships. Volume 4 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy 15,817,464 14,693,978 5,802,107 20,496,085 Grand Total Department of War 15,817,464 14,693,978 5,802,107 20,496,085 UNCLASSIFIED Volume 4 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 Total Department of the Navy 18,866,679 50,000 18,916,679 Grand Total Department of War 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 4 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy UNCLASSIFIED Volume 4 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 4 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ships support equipment 6,488,639 5,839,954 3,510,954 9,350,908 02. Communications and electronics equipment 4,075,820 4,467,421 143,000 4,610,421 03. Aviation support equipment 883,449 843,043 80,000 923,043 04. Ordnance support equipment 1,432,684 1,660,570 17,380 1,677,950 260,583 350,308 200 350,508 1,049,044 672,821 40,800 713,621 05. Civil engineering support equipment 06. Supply support equipment 07. Personnel and command support equipment 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 15,817,464 14,693,978 5,802,107 20,496,085 08. Spares and repair parts Total Other Procurement, Navy UNCLASSIFIED Volume 4 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ships support equipment 7,696,789 02. Communications and electronics equipment 50,000 7,746,789 5,446,166 5,446,166 03. Aviation support equipment 899,479 899,479 04. Ordnance support equipment 2,210,273 2,210,273 05. Civil engineering support equipment 353,489 353,489 06. Supply support equipment 396,204 396,204 1,098,568 1,098,568 765,711 765,711 07. Personnel and command support equipment 08. Spares and repair parts Total Other Procurement, Navy 18,866,679 UNCLASSIFIED 50,000 18,916,679 Volume 4 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 20,840 9,978 9,978 A U 77,592 62,004 62,004 A U 97,206 96,945 96,945 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 275,575 204,863 204,863 5 DDG Mod A U 822,065 878,787 878,787 6 Firefighting Equipment A U 38,521 36,488 36,488 UNCLASSIFIED Volume 4 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 22,668 22,668 A U 103,871 103,871 A U 83,510 83,510 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 344,885 344,885 5 DDG Mod A U 1,000,278 1,000,278 6 Firefighting Equipment A U 177,708 177,708 UNCLASSIFIED Volume 4 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 7 Command and Control Switchboard A U 2,402 2,417 8 LHA/LHD Midlife A U 76,601 60,617 9 LCC 19/20 Extended Service Life Program A U 7,352 19,276 19,276 10 Pollution Control Equipment B U 23,440 22,477 22,477 11 Submarine Support Equipment A U 278,766 383,062 383,062 12 Virginia Class Support Equipment A U 43,565 52,039 52,039 13 LCS Class Support Equipment U 5,855 2,551 2,551 14 Submarine Batteries U 30,470 28,169 28,169 15 LPD Class Support Equipment U 45,738 96,542 16 DDG 1000 Class Support Equipment A U 325,668 115,267 115,267 17 Strategic Platform Support Equip A U 53,931 38,039 38,039 UNCLASSIFIED 2,417 65,400 29,000 126,017 125,542 Volume 4 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7 Command and Control Switchboard A U 2,259 2,259 8 LHA/LHD Midlife A U 131,315 131,315 9 LCC 19/20 Extended Service Life Program A U 766 766 10 Pollution Control Equipment B U 22,506 22,506 11 Submarine Support Equipment A U 330,951 330,951 12 Virginia Class Support Equipment A U 83,297 83,297 13 LCS Class Support Equipment U 15,815 15,815 14 Submarine Batteries U 26,211 26,211 15 LPD Class Support Equipment U 213,723 213,723 16 DDG 1000 Class Support Equipment A U 58,284 58,284 17 Strategic Platform Support Equip A U 72,163 72,163 UNCLASSIFIED Volume 4 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2025 Actuals Sec U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 4,586 Cost Qty Qty 5,849 U A Cost FY 2026 Total Cost 5,849 694,020 694,020 20,321 20,321 U 11,013 U 16,650 22,355 A U 66,346 12,691 A U 3,254 2,607 2,607 22,355 7,400 20,091 Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,573,098 2,392,620 2,392,620 25 Reactor Components A U 445,974 474,806 474,806 A U 14,000 7,842 7,842 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 4 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 7,440 7,440 U 585 585 U 22,515 22,515 U 20,575 20,575 A U 69,425 69,425 A U 2,425 2,425 A Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,737,140 2,737,140 25 Reactor Components A U 519,821 519,821 A U 33,013 33,013 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 4 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 28 Standard Boats A U 447,298 A U 1,950,714 1,950,714 82,086 5,100 87,186 209,304 394,998 390,600 785,598 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 56,103 38,880 38,880 31 LCS MCM Mission Modules U 118,247 91,372 91,372 32 LCS SUW Mission Modules U 11,101 3,790 3,790 33 LCS In-Service Modernization A U 188,254 189,458 189,458 34 Small & Medium UUV A U 48,780 7,000 UNCLASSIFIED 345,086 352,086 Volume 4 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 121,130 28 Standard Boats A U 97,746 97,746 A U 492,100 492,100 50,000 171,130 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 30,565 30,565 31 LCS MCM Mission Modules U 65,113 65,113 32 LCS SUW Mission Modules U 1,719 1,719 33 LCS In-Service Modernization A U 315,272 315,272 34 Small & Medium UUV A U 110,955 110,955 UNCLASSIFIED Volume 4 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 35 Large UUV A U 36 Extra Large UUV A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty 3,313 Cost 3,313 Logistic Support 37 LSD Midlife & Modernization U Total Ships support equipment 49,044 4,079 6,488,639 5,839,954 4,079 3,510,954 9,350,908 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 7,402 39 AN/SQQ-89 Surf ASW Combat System A U 134,635 144,425 144,425 40 SSN Acoustic Equipment A U 458,824 498,597 498,597 41 Undersea Warfare Support Equipment A U 14,247 UNCLASSIFIED Volume 4 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 35 Large UUV A U 222,998 222,998 36 Extra Large UUV A U 135,802 135,802 U 240 240 Logistic Support 37 LSD Midlife & Modernization Total Ships support equipment 7,696,789 50,000 7,746,789 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 39 AN/SQQ-89 Surf ASW Combat System A U 142,355 142,355 40 SSN Acoustic Equipment A U 454,161 454,161 41 Undersea Warfare Support Equipment A U UNCLASSIFIED Volume 4 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 51,514 56,482 56,482 43 SSTD A U 9,647 14,915 14,915 44 Fixed Surveillance System A U 405,854 352,312 45 SURTASS A U 45,975 31,169 31,169 A U 190,011 422,704 422,704 A U 361,915 379,908 379,908 U 4,680 13,008 13,008 143,000 495,312 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 4 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 68,881 68,881 43 SSTD A U 14,857 14,857 44 Fixed Surveillance System A U 490,548 490,548 45 SURTASS A U 72,190 72,190 A U 653,483 653,483 A U 701,667 701,667 U 8,652 8,652 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 4 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 49 Cooperative Engagement Capability B U 26,644 26,648 26,648 50 Naval Tactical Command Support System (NTCSS) A U 13,614 7,972 7,972 51 ATDLS A U 68,458 58,739 58,739 52 Navy Command and Control System (NCCS) U 3,645 3,489 3,489 53 Minesweeping System Replacement A U 16,808 16,426 16,426 54 Navstar GPS Receivers (SPACE) A U 37,964 45,701 45,701 55 American Forces Radio and TV Service A U 3,802 304 304 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 90,586 97,262 97,262 57 Afloat ATC Equipment A U 74,458 72,104 72,104 58 ID Systems A U 59,602 52,171 52,171 UNCLASSIFIED Volume 4 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 49 Cooperative Engagement Capability B U 33,932 33,932 50 Naval Tactical Command Support System (NTCSS) A U 10,108 10,108 51 ATDLS A U 52,758 52,758 52 Navy Command and Control System (NCCS) U 16,167 16,167 53 Minesweeping System Replacement A U 14,879 14,879 54 Navstar GPS Receivers (SPACE) A U 43,097 43,097 55 American Forces Radio and TV Service A U 289 289 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 83,057 83,057 57 Afloat ATC Equipment A U 62,581 62,581 58 ID Systems A U 35,620 35,620 UNCLASSIFIED Volume 4 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost U 7,287 5,105 5,105 U 42,326 60,058 60,058 U 8,479 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 66,470 64,901 64,901 63 Intelligence Surveillance and Reconnaissance (ISR) A U 16,946 12,112 12,112 64 CANES U 439,977 534,324 534,324 65 RADIAC U 38,688 31,289 31,289 66 CANES-Intell U 50,654 46,281 46,281 67 GPETE U 32,005 33,395 33,395 68 MASF U 24,361 13,205 13,205 A A UNCLASSIFIED Volume 4 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 2,976 2,976 U 54,487 54,487 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 48,262 48,262 63 Intelligence Surveillance and Reconnaissance (ISR) A U 11,824 11,824 64 CANES U 493,046 493,046 65 RADIAC U 38,000 38,000 66 CANES-Intell U 43,028 43,028 67 GPETE U 31,462 31,462 68 MASF U 5,822 5,822 U A A UNCLASSIFIED Volume 4 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 69 Integ Combat System Test Facility A U 6,709 11,493 11,493 70 EMI Control Instrumentation A U 4,081 3,687 3,687 71 In-Service Radars and Sensors A U 262,890 249,656 249,656 Shipboard Communications 72 Battle Force Tactical Network A U 104,019 106,583 106,583 73 Shipboard Tactical Communications A U 24,602 20,900 20,900 74 Ship Communications Automation A U 127,321 162,075 162,075 75 Communications Items Under $5M A U 9,209 11,138 11,138 Submarine Communications 76 Submarine Broadcast Support A U 129,467 113,115 113,115 77 Submarine Communication Equipment A U 68,334 84,584 84,584 UNCLASSIFIED Volume 4 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 69 Integ Combat System Test Facility A U 6,454 6,454 70 EMI Control Instrumentation A U 3,435 3,435 71 In-Service Radars and Sensors A U 338,946 338,946 Shipboard Communications 72 Battle Force Tactical Network A U 125,661 125,661 73 Shipboard Tactical Communications A U 50,350 50,350 74 Ship Communications Automation A U 156,605 156,605 75 Communications Items Under $5M A U 15,097 15,097 Submarine Communications 76 Submarine Broadcast Support A U 173,069 173,069 77 Submarine Communication Equipment A U 88,071 88,071 UNCLASSIFIED Volume 4 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 59,732 62,943 62,943 U 162,928 63,433 63,433 220,453 220,453 A U A U 4,551 3,389 3,389 Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 195,063 191,239 191,239 83 MIO Intel Exploitation Team A U 1,100 1,122 1,122 Cryptologic Equipment UNCLASSIFIED Volume 4 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 57,961 57,961 U 57,768 57,768 A U 202,305 202,305 A U Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 349,099 349,099 83 MIO Intel Exploitation Team A U 1,063 1,063 Cryptologic Equipment UNCLASSIFIED Volume 4 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty A U 15,506 Cost Qty Cost FY 2026 Total Qty Cost 7,841 7,841 58,764 58,764 Other Electronic Support 85 DON TRR-1 (Afloat) A U 10,370 86 DON UAS Video 5 (Afloat) A U 5,370 87 USN Ashore/Shipboard CONOPS Verification and A U 6,586 88 USN Training Ranges - Codify CONOPS/TTPs A U 1,375 89 USN Training Ranges - Spectrum Sensing A U 1,000 90 USN EME Sensing and Monitoring A U 120 91 Coast Guard Equipment A U 49,523 A U 18,486 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 4 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2027 Discretionary Request Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7,419 7,419 Other Electronic Support 85 DON TRR-1 (Afloat) A U 86 DON UAS Video 5 (Afloat) A U 87 USN Ashore/Shipboard CONOPS Verification and A U 88 USN Training Ranges - Codify CONOPS/TTPs A U 89 USN Training Ranges - Spectrum Sensing A U 90 USN EME Sensing and Monitoring A U 91 Coast Guard Equipment A U 67,106 67,106 A U 57,568 57,568 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 4 - xxxvi === page 39 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Total Communications and electronics equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 4,075,820 4,467,421 143,000 4,610,421 80,000 369,908 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 353,441 289,908 Aircraft Support Equipment 94 Minotaur A U 5,431 5,191 5,191 95 Weapons Range Support Equipment A U 138,062 123,435 123,435 96 Aircraft Support Equipment A U 121,727 82,039 82,039 97 Advanced Arresting Gear (AAG) A U 2,244 4,484 4,484 98 Electromagnetic Aircraft Launch System (EMALS A U 14,702 16,294 16,294 99 Meteorological Equipment A U 17,982 13,806 13,806 UNCLASSIFIED Volume 4 - xxxvii === page 40 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Total Communications and electronics equipment Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 5,446,166 5,446,166 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 300,151 300,151 Aircraft Support Equipment 94 Minotaur A U 4,831 4,831 95 Weapons Range Support Equipment A U 119,900 119,900 96 Aircraft Support Equipment A U 69,065 69,065 97 Advanced Arresting Gear (AAG) A U 23,551 23,551 98 Electromagnetic Aircraft Launch System (EMALS A U 36,908 36,908 99 Meteorological Equipment A U 7,477 7,477 UNCLASSIFIED Volume 4 - xxxviii === page 41 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 100 Airborne MCM A U 10,643 9,643 9,643 101 Aviation Support Equipment A U 99,656 111,334 111,334 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 119,561 186,909 186,909 883,449 843,043 Total Aviation support equipment 80,000 923,043 Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,712 7,358 7,358 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 226 209 209 105 Ship Missile Support Equipment A U 431,830 527,292 527,292 106 Tomahawk Support Equipment A U 98,921 107,709 107,709 FBM Support Equipment UNCLASSIFIED Volume 4 - xxxix === page 42 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 100 Airborne MCM A U 9,507 9,507 101 Aviation Support Equipment A U 116,873 116,873 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 211,216 211,216 899,479 899,479 Total Aviation support equipment Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,962 6,962 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 195 195 105 Ship Missile Support Equipment A U 431,069 431,069 106 Tomahawk Support Equipment A U 116,208 116,208 FBM Support Equipment UNCLASSIFIED Volume 4 - xl === page 43 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty 107 CPS Support Equipment A U 108 Strategic Missile Systems Equip A U 320,691 491,179 Cost FY 2026 Total Qty 67,264 Cost 67,264 9,180 500,359 ASW Support Equipment 109 SSN Combat Control Systems A U 153,237 102,954 102,954 110 ASW Support Equipment A U 25,362 25,721 25,721 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 52,885 17,758 17,758 112 Directed Energy Systems A U 3,817 2,976 2,976 113 Items Less Than $5 Million A U 3,193 3,635 3,635 A U 75,614 50,741 50,741 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 4 - xli === page 44 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 107 CPS Support Equipment A U 188,430 188,430 108 Strategic Missile Systems Equip A U 327,941 327,941 ASW Support Equipment 109 SSN Combat Control Systems A U 165,416 165,416 110 ASW Support Equipment A U 25,105 25,105 48,252 48,252 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 112 Directed Energy Systems A U 113 Items Less Than $5 Million A U 2,592 2,592 A U 606,241 606,241 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 4 - xlii === page 45 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 80,236 Cost Qty Cost FY 2026 Total Qty 77,889 Cost 77,889 179,960 177,885 8,200 186,085 1,432,684 1,660,570 17,380 1,677,950 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,751 3,825 3,825 118 General Purpose Trucks A U 5,795 5,489 5,489 119 Trailers A U 120 Construction & Maintenance Equip A U 76,983 105,592 105,592 121 Fire Fighting Equipment A U 23,006 27,675 27,675 122 Tactical Vehicles B U 36,355 37,262 37,262 123 Amphibious Equipment A U 6,454 38,073 38,073 200 UNCLASSIFIED 200 Volume 4 - xliii === page 46 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2027 Mandatory Request Qty 73,681 Cost FY 2027 Total Qty Cost 73,681 218,181 218,181 2,210,273 2,210,273 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,567 3,567 118 General Purpose Trucks A U 4,801 4,801 119 Trailers A U 120 Construction & Maintenance Equip A U 91,269 91,269 121 Fire Fighting Equipment A U 17,107 17,107 122 Tactical Vehicles B U 46,796 46,796 123 Amphibious Equipment A U 53,916 53,916 UNCLASSIFIED Volume 4 - xliv === page 47 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 124 Pollution Control Equipment A U 3,924 4,009 4,009 125 Items less than $5 Million A U 103,014 127,086 127,086 126 Physical Security Vehicles A U 1,301 1,297 1,297 260,583 350,308 Total Civil engineering support equipment 200 350,508 40,800 40,800 Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 56,585 128 First Destination Transportation A U 6,463 6,203 129 Special Purpose Supply Systems A U Total Supply support equipment 985,996 666,618 1,049,044 672,821 5,341 3,480 6,203 666,618 40,800 713,621 Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED 3,480 Volume 4 - xlv === page 48 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 124 Pollution Control Equipment A U 3,586 3,586 125 Items less than $5 Million A U 131,449 131,449 126 Physical Security Vehicles A U 998 998 353,489 353,489 Total Civil engineering support equipment Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 67,828 67,828 128 First Destination Transportation A U 4,732 4,732 129 Special Purpose Supply Systems A U 323,644 323,644 396,204 396,204 10,608 10,608 Total Supply support equipment Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED Volume 4 - xlvi === page 49 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost A U 43,126 73,631 73,631 Command Support Equipment 132 Command Support Equipment A U 29,698 34,249 34,249 133 Medical Support Equipment A U 10,122 24,256 24,256 135 Naval MIP Support Equipment A U 6,590 8,810 136 Operating Forces Support Equipment A U 17,941 16,567 16,567 137 C4ISR Equipment A U 33,606 36,945 36,945 138 Environmental Support Equipment A U 47,499 42,860 42,860 139 Physical Security Equipment A U 138,799 166,577 166,577 140 Enterprise Information Technology A U 42,026 42,363 42,363 UNCLASSIFIED 21,946 30,756 Volume 4 - xlvii === page 50 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost A U 331,016 331,016 Command Support Equipment 132 Command Support Equipment A U 55,202 55,202 133 Medical Support Equipment A U 54,862 54,862 135 Naval MIP Support Equipment A U 5,213 5,213 136 Operating Forces Support Equipment A U 15,107 15,107 137 C4ISR Equipment A U 33,975 33,975 138 Environmental Support Equipment A U 60,467 60,467 139 Physical Security Equipment A U 218,037 218,037 140 Enterprise Information Technology A U 40,490 40,490 UNCLASSIFIED Volume 4 - xlviii === page 51 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Other 141 Cancelled Account Adjustments A U 46 142 Next Generation Enterprise Service A U 226,479 185,755 185,755 143 Cyberspace Activities A U 2,195 2,239 2,239 Classified Programs 999 Classified Programs U 16,134 62,991 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 Total Spares and repair parts 1,007,643 159,138 1,987,827 2,146,965 Total Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Personnel and command support equipment 62,991 Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED Volume 4 - xlix === page 52 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Other 141 Cancelled Account Adjustments A U 142 Next Generation Enterprise Service A U 223,647 223,647 143 Cyberspace Activities A U 7,131 7,131 Classified Programs 999 Classified Programs U 42,813 42,813 1,098,568 1,098,568 765,711 765,711 Total Spares and repair parts 765,711 765,711 Total Other Procurement, Navy 18,866,679 Total Personnel and command support equipment Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED 50,000 18,916,679 Volume 4 - l === page 53 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 4 - li === page 54 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 4 - lii === page 55 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 UNCLASSIFIED Volume 4 - liii === page 56 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 UNCLASSIFIED Volume 4 - liv === page 57 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 UNCLASSIFIED Volume 4 - lv === page 58 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 4 - lvi === page 59 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 4 - lvii === page 60 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 127 06 01 7025 Supply Equipment.............................................................................................................................. Volume 5 - 121 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 UNCLASSIFIED Volume 4 - lviii === page 61 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 129 06 01 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 7069 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 143 07 05 8645 Cyberspace Activities.........................................................................................................................Volume 5 - 315 UNCLASSIFIED Volume 4 - lix === page 62 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 4 - lx === page 63 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 UNCLASSIFIED Volume 4 - lxi === page 64 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 EOD Equipment 5509 111 04 06................... Volume 4 - 141 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 UNCLASSIFIED Volume 4 - lxii === page 65 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 ID Systems 2851 58 02 09................... Volume 2 - 471 In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 UNCLASSIFIED Volume 4 - lxiii === page 66 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Minotaur 3640 94 03 03..................... Volume 3 - 31 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 UNCLASSIFIED Volume 4 - lxiv === page 67 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 RADIAC 2920 65 02 10................... Volume 2 - 579 Reactor Components 1020 25 01 10................... Volume 1 - 491 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 SURTASS 2237 45 02 03................... Volume 2 - 143 UNCLASSIFIED Volume 4 - lxv === page 68 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 UNCLASSIFIED Volume 4 - lxvi === page 69 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 4 - lxvii === page 70 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - lxviii === page 71 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 4 - lxix === page 72 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - lxx === page 73 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 EOD Equipment 5509 111 04 06................... Volume 4 - 141 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 UNCLASSIFIED Volume 4 - lxxi === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - lxxii === page 75 === Executive Summary for Other Procurement, Navy Table 1: FundingOverview Discretionary Mandatory Total BLI 0933 0946 0954 0954 0956 0970 0970 0981 1210 1445 1445 1611 1613 2225 3050 3415 4048 5358 5664 6007 7025 8114 9020 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 15,817,464 14,693,978 18,866,679 31,650 5,802,107 50,000 15,849,114 20,496,085 18,916,679 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title Readiness Readiness Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Readiness Readiness INDOPACOM Capabilities INDOPACOM Capabilities Readiness Shipbuilding Shipbuilding INDOPACOM Capabilities Low-Cost Weapons Low-Cost Weapons Munitions and Supply Chain Nuclear Readiness INDOPACOM Capabilities Shipbuilding INDOPACOM Capabilities Readiness FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 23,775 $ 7,875 $ $ $ $ $ $ $ $ 31,650 FY 2026 ($K) $ 65,400 $ 29,000 $ 1,950,714 $ $ 694,020 $ 20,148 $ 173 $ 7,400 $ 5,100 $ 117,600 $ 273,000 $ 345,086 $ 3,313 $ 143,000 $ $ $ 80,000 $ 9,180 $ 8,200 $ 200 $ 40,800 $ 21,946 $ 1,987,827 $ 5,802,107 FY 2027 ($K) $ $ $ $ 50,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 50,000 Volume 4 - lxxiii === page 76 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Other Procurement, Navy includes $18,866,679 thousand of discretionary and $50,000 thousand of mandatory for a total of $18,916,679 thousand. The mandatory funds support: Medium Uncrewed Surface Vessels (MUSV): The Navy’s FY 2027 mandatory budget request includes $50 million for the procurement of one vessel. The FY 2026 spend plan for Other Procurement, Navy includes $14,693,978 thousand of discretionary and $5,802,107 thousand of mandatory for a total of $20,496,085 thousand. The FY 2025 spend plan for Other Procurement, Navy includes $15,817,464 thousand of discretionary and $31,650 thousand of mandatory for a total of $15,849,114 thousand. Volume 4 - lxxiv === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 2: Ship Gun System Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 66.111 6.712 7.358 6.962 0.000 6.962 7.354 7.453 7.614 - - - - - - - - - 66.111 6.712 7.358 6.962 0.000 6.962 7.354 7.453 7.614 To FY 2031 Complete 7.771 Continuing - Continuing - 7.771 Continuing - Total - Continuing - - - - - - - - - - - 66.111 6.712 7.358 6.962 0.000 6.962 7.354 7.453 7.614 7.771 Continuing Continuing 0.585 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.100 - 0.144 - 0.144 0.257 0.325 0.633 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Ship gun system equipment provides funds for the procurement of equipment, material and Ordnance Alterations to improve combat effectiveness and logistic supportability for gun and mission planning systems, and ancillary support equipment. [P40A - 2 / NV039 Night Vision Devices]: [P40A - 2 / NV039 VISUAL AUGMENTATION SYSTEMS (VAS)]: The United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoW VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Other Procurement, Navy funding provides the United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record with funding to procure new and replacement night vision equipment, thermal detection equipment, day/night optics and associated test equipment for ships, submarines, carriers, expeditionary forces and shore installations so that commanders can maintain situational awareness in degraded visual environments while maintaining the greatest possible distance from threats. [P40A - 2 / NV051 Optical Sight Systems Production Improvement]: Procures various Product Improvements for MK46 OSS/MK20 Electro-Optical Sight System (EOSS) on DDG 51 and CG 47 Class ships. The OSS is an integral element of the MK 34 Gun Weapon System. These improvements provide enhanced force protection capabilities, improve availability to address increase in Fleet underway operations, and reduce total ownership costs by improved reliability and supportability of in-service equipment systems. System and component improvements include: Mod 0 Technical Refresh, upgrade of Daylight Imaging Sensor Field of View, system power supplies, Mod 0 console / monitor upgrade, system obsolescence replacement and component level product improvements. [P40A - 2 / 98 Visual Augmentation System]: The Naval Fires Control System is an automated mission planning and coordination system for the Naval Surface Fire Support (NSFS) System. It automates shipboard land attack battle management duties to be interoperable and consistent with joint C4ISR systems. The system significantly improves the Navy's ability to support forces ashore. These improvements provide enhanced capabilities and reduce total ownership costs by improving reliability and supportability of in-service systems. This system also reduces manning requirements for NSFS missions. LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 1 of 6 P-1 Line #103 Volume 4 - 1 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 2: Ship Gun System Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Naval Fires Control Sys P-40a Gun Fire Control Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 4.600 - / 0.421 - / 0.417 - / 0.364 - / - - / 0.364 - / 61.511 - / 6.291 - / 6.941 - / 6.598 - / - - / 6.598 - / 66.111 - / 6.712 - / 7.358 - / 6.962 / 0.000 - / 6.962 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 2 of 6 P-1 Line #103 Volume 4 - 2 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Naval Fires Control Sys FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) INSTALLATION 1.1) FC010 Product Improvement/ ORDALT A 1.2) FC011 Installation of ORDALT A 1.3) FC830 Production Engineering Support (NFCS) A - - 2.236 - - 0.195 - - 0.193 - - 0.168 - - - - - 0.168 - - 1.049 - - 0.106 - - 0.105 - - 0.092 - - - - - 0.092 - - 1.315 - - 0.120 - - 0.119 - - 0.104 - - - - - 0.104 Subtotal: 1) INSTALLATION - - 4.600 - - 0.421 - - 0.417 - - 0.364 - - - - - 0.364 Total - - 4.600 - - 0.421 - - 0.417 - - 0.364 - - - - - 0.364 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 3 of 6 P-1 Line #103 Volume 4 - 3 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) (Each) Gun Fire Control Equipment FY 2027 Base Total Cost Qty Aggregated Items Title: Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Equipment 1.1) NV039 Night Vision Devices A 1.2) NV051 Optical Sight Systems Production Improvement A Subtotal: 1) Equipment - - 13.776 - - - - - - - - 0.216 - - - - - 0.216 - - 27.411 - - 2.954 - - 2.931 - - 2.560 - - - - - 2.560 - - 41.187 - - 2.954 - - 2.931 - - 2.776 - - - - - 2.776 - - 0.143 - - - - - - - - - - - - - - - 10,467.76 1,830 19.156 12,000.00 215 2.580 12,400.00 267 3.311 12,800.00 230 2.944 - - - 12,800.00 230 2.944 440.32 1,265 0.557 450.00 215 0.097 460.00 203 0.093 475.00 194 0.092 - - - 475.00 194 0.092 102.12 1,038 0.106 120.00 215 0.026 130.00 213 0.028 140.00 213 0.030 - - - 140.00 213 0.030 4,250.00 4 0.017 - - - - - - - - - - - - - - - 2) NV039 Visual Augmentation System 2.1) Night Vision Devices A 2.2) Night Vision, Individual (AN/ A (2)(†) PVS-31B) 2.3) NVD Helmet (†) A Mount 2.4) NVD Helmet (†) A Shroud 2.5) SU-289/VCOG/ SCO A (3) A - - 0.007 - - 0.152 - - - - - 0.214 - - - - - 0.214 - - 19.986 - - 2.855 - - 3.432 - - 3.280 - - - - - 3.280 11,500.00 28 0.322 12,000.00 39 0.468 12,400.00 44 0.546 12,800.00 40 0.512 - - - 12,800.00 40 0.512 406.25 32 0.013 450.00 24 0.011 460.00 53 0.024 475.00 51 0.024 - - - 475.00 51 0.024 107.14 28 0.003 120.00 26 0.003 130.00 58 0.008 140.00 40 0.006 - - - 140.00 40 0.006 Subtotal: 3) 98 Visual Augmentation System - - 0.338 - - 0.482 - - 0.578 - - 0.542 - - - - - 0.542 Total - - 61.511 - - 6.291 - - 6.941 - - 6.598 - - - - - 6.598 2.6) TAC Subtotal: 2) NV039 Visual Augmentation System 3) 98 Visual Augmentation System 3.1) NIGHT VISION/ INDIVIDUAL/(AN/ PVS-31B) (†) 3.2) NVD HELMET MOUNT (†) 3.3) NVD HELMET SHROUD A (†) A A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) This program provides for the procurement of equipment, materials and Ordnance Alterations to improve combat effectiveness and maintain logistic supportability of Gun Fire Control Equipment, Optical Sight Systems (OSS) and Night Vision devices. LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 4 of 6 P-1 Line #103 Volume 4 - 4 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 2 (2) (3) P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Aggregated Items Title: Gun Fire Control Equipment (1) N95 transitioned VAS RDT&E to procurement beginning in FY26 TAC requirements not needed LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 5 of 6 P-1 Line #103 Volume 4 - 5 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 2 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5111 / Ship Gun Systems Equipment Method/Type or Funding Vehicle Aggregated Items: Gun Fire Control Equipment Location of PCO Award Date Date of First Delivery (1) Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2023 L3 Harris Technologies / Londonderry, NH MIPR DLA, Philadelphia, PA Oct 2022 Oct 2022 275 8,650.00 Y 2024 L3 Harris Technologies / Londonderry, NH MIPR DLA, Philadelphia, PA Oct 2023 Oct 2023 1,080 11,501.82 Y 2025 L3 Harris Technologies / Londonderry, NH MIPR DLA, Philadelphia, PA Oct 2024 Oct 2024 215 12,000.00 Y (2) 2026 L3 Harris Technologies / Londonderry, NH MIPR DLA, Philadelphia, PA Oct 2025 Oct 2025 267 12,400.00 Y 2.3) NVD Helmet Mount 2023 Wilcox / Newington, NH C / IDIQ Crane, IN Feb 2023 Sep 2023 280 450.00 Y 2.3) NVD Helmet Mount 2024 Wilcox / Newington, NH C / IDIQ Crane, IN Feb 2024 Sep 2024 206 395.44 N Sep 2024 2.3) NVD Helmet Mount 2025 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2024 Oct 2024 215 450.00 N Oct 2024 2.3) NVD Helmet Mount 2026 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2025 Oct 2025 203 460.00 N Oct 2025 2.4) NVD Helmet Shroud 2023 Wilcox / Newington, NH C / IDIQ Crane, IN Sep 2023 Apr 2024 827 100.00 Y 2.4) NVD Helmet Shroud 2024 Wilcox / Newington, NH C / IDIQ Crane, IN Sep 2024 Apr 2025 211 110.00 N Sep 2024 2.4) NVD Helmet Shroud 2025 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2024 Oct 2024 215 120.00 N Oct 2024 2.4) NVD Helmet Shroud 2026 Wilcox / Newington, NH C / IDDQ Crane, IN Oct 2025 Oct 2025 213 130.00 N Oct 2025 3.1) NIGHT VISION/INDIVIDUAL/ (AN/PVS-31B) 2024 L3 Harris Technologies / Londonderry, NH MIPR DLA / PHILADELPHIA, PA Oct 2023 Oct 2023 28 11,501.00 N Feb 2024 3.1) NIGHT VISION/INDIVIDUAL/ (AN/PVS-31B) 2025 L3 Harris Technologies / Londonderry, NH MIPR DLA / PHILADELPHIA, PA Oct 2024 Oct 2024 39 12,000.00 N Feb 2025 3.1) NIGHT VISION/INDIVIDUAL/ (AN/PVS-31B) 2026 L3 Harris Technologies / Londonderry, NH MIPR DLA / PHILADELPHIA, PA Oct 2025 Oct 2025 44 12,400.00 N Feb 2026 3.2) NVD HELMET MOUNT 2024 Wilcox / Newington, NH C / IDDQ Crane, IN Oct 2023 May 2024 32 395.44 N 3.2) NVD HELMET MOUNT 2025 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2024 Oct 2024 24 450.00 N 3.2) NVD HELMET MOUNT 2026 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2025 Oct 2025 53 460.00 N 3.3) NVD HELMET SHROUD 2024 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2023 May 2024 28 92.31 N 3.3) NVD HELMET SHROUD 2025 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2024 Oct 2024 26 120.00 N 3.3) NVD HELMET SHROUD 2026 Wilcox / Newington, NH C / IDIQ Crane, IN Oct 2025 Oct 2025 58 130.00 N (Each) RFP Issue Date 2) NV039 Visual Augmentation System 2.2) Night Vision, Individual (AN/ PVS-31B) (2) 2.2) Night Vision, Individual (AN/ PVS-31B) (2) 2.2) Night Vision, Individual (AN/ PVS-31B) (2) 2.2) Night Vision, Individual (AN/ PVS-31B) Oct 2025 3) 98 Visual Augmentation System LI 5111 - Ship Gun Systems Equipment Navy UNCLASSIFIED Page 6 of 6 P-1 Line #103 Volume 4 - 6 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5227 / HARPOON Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.648 0.226 0.209 0.195 0.000 0.195 0.208 0.210 0.214 0.219 - 2.129 Total - - - - - - - - - - - - 0.648 0.226 0.209 0.195 0.000 0.195 0.208 0.210 0.214 0.219 - 2.129 - - - - - - - - - - - - 0.648 0.226 0.209 0.195 0.000 0.195 0.208 0.210 0.214 0.219 - 2.129 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Director of the Undersea Warfare Division (N97) has ordered the reconstitution and integration of 64 Encapsulated (ENCAP) Harpoon BLK IC missile systems for the 688 class submarine fleet in order to provide over the horizon surface strike capabilities to the fleet. The ENCAP Harpoon missiles provide Navy Los Angeles-class nuclear attack submarines (SSN) a sub-launched, all-weather, long-range AntiSurface Warfare (ASuW) missile to attack enemy warships at stand-off ranges, to include Surface and Amphibious Action Groups. There are currently retired Encapsulated Harpoons located at the Letterkenny Army Depot that are candidates for reconstitution and delivery to the submarine fleet. In order to accomplish this order, the ENCAP program will refurbish and recertify existing ENCAP H1C All Up Rounds from deep storage to an 'as new' war ready material condition. (ENCAP Harpoons were placed in deep storage in 1996). The controlled storage conditions achieved by the missile capsule have preserved the material condition of the weapon system, allowing for relatively quick recertification and reissue. Due to the ease and speed of missile recertification the ENCAP Harpoon Reconstitution Program will fill a critical, time sensitive ASuW capability gap and meet Speed to the Fleet requirements. LI 5227 - HARPOON Support Equipment Navy UNCLASSIFIED Page 1 of 3 P-1 Line #104 Volume 4 - 7 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5227 / HARPOON Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a HARPOON Support - Support Costs - / 0.648 - / 0.226 - / 0.209 - / 0.195 P-40 Total Gross/Weapon System Cost - / 0.648 - / 0.226 - / 0.209 - / 0.195 - / - - / 0.195 / 0.000 - / 0.195 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding is provided for shipboard software updates on submarines receiving the Encapsulated (ENCAP) Harpoon missile. The submarine software updates enable submarine launchers to accommodate the ENCAP Harpoon missiles. LI 5227 - HARPOON Support Equipment Navy UNCLASSIFIED Page 2 of 3 P-1 Line #104 Volume 4 - 8 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5227 / HARPOON Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: HARPOON Support - Support Costs FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Harpoon Support Equipment A - - 0.648 - - 0.226 - - 0.209 - - 0.195 - - - - - 0.195 Subtotal: 1) Harpoon Support Equipment - - 0.648 - - 0.226 - - 0.209 - - 0.195 - - - - - 0.195 Total - - 0.648 - - 0.226 - - 0.209 - - 0.195 - - - - - 0.195 1.1) ILS (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) ILS: required to re-integrate ENCAPs into the submarine databases and firing systems. LI 5227 - HARPOON Support Equipment Navy UNCLASSIFIED Page 3 of 3 P-1 Line #104 Volume 4 - 9 === page 86 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 10 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,174.614 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,174.614 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,174.614 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 431.830 431.830 431.830 527.292 527.292 527.292 431.069 - 0.000 - 431.069 - 0.000 - 431.069 0.000 431.069 431.069 431.069 415.368 415.368 415.368 391.399 391.399 391.399 411.245 411.245 411.245 To FY 2031 Complete 421.136 Continuing 421.136 Total - Continuing Continuing - Continuing - - Continuing Continuing 6.316 Continuing Continuing 421.136 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 32.878 - 12.525 - 12.525 11.639 7.451 6.801 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Ship Missile Support Equipment provides procurement and installation support to address fleet requirements for AEGIS Weapons System, Ships Self Defense System (SSDS), Vertical Launch Systems (VLS), NATO SEASPARROW Surface Missile System (NSSMS), Rolling Airframe Missile (RAM) Guided Missile Launching System (GMLS), Over The Horizon Weapon System (OTH WS), MK57 Vertical Launching System (VLS) Support Equipment, Integrated Combat system (ICS), Counter Unmanned Aircraft System (C-UAS) and SeaRAM Close-In Weapon System (CIWS). Below are program descriptions for each of these programs along with top line funding summaries. Improved Stalker (I-Stalker) is the Independent Mount (IM) Improvement to the Stalker Long Range Electro-Optic Sensor System (SLREOSS) system in response to a 2016 United States Fleet Forces Command (USFFC) Operational Needs Statement (ONS). I-Stalker is currently fielded on CVN and LHA/LHD ship classes. I-Stalker provides the capability for 360-degree situational awareness and enhances the ability of ships to passively detect, classify, identify and determine intent of current/emerging surface and air threats in support of the following warfare missions: Surface/Air Recon, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), Search & Rescue, Force Protection, and Mobility. I-Stalker, combined with the Navy-owned Situational Awareness System (SAwS), delivers an integrated radar and Electro Optic/Infrared (EO/IR) control and display suite. I-Stalker includes two (2) NSSMS MK6 MOD 4 LLLTV 4 LLLTV Independent Mount systems and one (1) SAwS. This combined system is referred to as the AN/SAY-3. I-Stalker requirements are transitioning from individual resource sponsor management to a total program level commensurate with the I-Stalker transition to a Program of Record (POR). For FY22 and prior years, I-Stalker funding is contained in BLI 5231. In FY24 and out, BLI 2981 contains funding from OPNAV N95 in support of LHA/LHD ship classes and OPNAV N98 in support of the CVN ship class. [P40A / NATO SEASPARROW]: [P40A / NATO SEASPARROW]: The NATO SEASPARROW Surface Missile System (NSSMS) is a shipboard Self-Defense Missile System. In addition to the standard mission of Anti-Air and Anti-Surface Defense (AAW, ASUW), NSSMS is designed to protect ship and crew from a variety of inbound threats, including Anti-Ship Cruise Missiles (ASCM), Fast Attack Craft/Fast Inshore Attack Craft (FAC/FIAC), Low Velocity Air Threats (LVAT), and a wide range of asymmetrical threats (e.g. Unmanned Aerial and Surface vehicles, small Rigid Hull Inflatable Boats, etc.). The legacy NSSMS configuration (MK57 MOD 2, 12/13, 14/15 and 16/17) consists of Fire Control and Launcher Systems comprised of 2-4 Directors, a distributed computing network, Transmitter Group, 3-5 Operating Consoles, and 2 Eight-Cell Guided Missile Launching Systems (MK29 GMLS) which employ the surface launch variant of the Sparrow (MK57 MOD 2/3) and ESSM (MK57 MOD 12/13, 14/15 and 16/17). In the MOD 12 and higher configuration, the MK57 NSSMS becomes part of the SSDS MK 2 Combat System. The fully integrated configurations of NSSMS are the MK57 MOD 12 and above configurations. A new transmitter replacement is in process to provide near term replacement of the obsolete MK73 Mod 3 Transmitter Group that can no longer be procured along with a Launcher replacement program required for fielding of ESSM BLK 2 missile capability integrated in an optimized fashion. This effort is intended to replace 1970's era MK 29 Guided Missile Launching System (GMLS) which is no longer producible. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 1 of 53 P-1 Line #105 Volume 4 - 11 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Launcher Min-Mod BLK 2 Capability Upgrade]: With the change in the current Min Mod program technical approach additional engineering is required to provide ESSM Block 2 capability in Functional Compatibility to CVN/LHA/LHD ships. The line has been changed from Launcher Min-Mod BLK 2 Capability H/W to Launcher Min-Mod BLK 2 Capability Upgrade to better reflect what is being accomplished on this line. [P40A / MK57 Mod 14-19 Engineering]: Field Activity, design agent and industry will provide Hardware/Software engineering support for the modernization/upgrade of the NSSMS MK57 systems from various field activities including NSWC PHD, NSWC DD, Raytheon IDS. Title updated from Mod 14-17 to Mod 14-19 to reflect included Adaptable Deck Launcher (ADL) efforts across all P40A categories. [P40A / MK57 Mod 14-19 Logistics]: Field Activity and design agent will provide Logistics support including Supply, Data Management, Configuration, Training and Quality Management during the modernization/ upgrade and installation of NSSMS MK57 systems on CVN/LHA/LHDs. Title updated from Mod 14-17 to Mod 14-19 to reflect included Adaptable Deck Launcher (ADL) efforts across all P40A categories. [P40A / MK57 Mod 14-19 Depot]: Field Activity and design agent will provide oversight and monitor the Depot operation to ensure compliance with quality assurance, compliance with technical requirements, and to ensure all products are delivered on time and within budget to meet ship schedules during the modernization/upgrade on NSSMS MK57 systems. Provide Depot Workload Planning, Budget Updates & Estimating, Contract, Upgrade/Repair Engineering, OM&S Inventory/Warehouse Management and Depot Logistics Support/NSPO Liaison and equipment modernization/upgrade. Title updated from Mod 14-17 to Mod 14-19 to reflect included Adaptable Deck Launcher (ADL) efforts across all P40A categories. [P40A / MK57 Mod 14-19 Cyber]: Field Activity and design will document and validate system compliance with the appropriate National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53A assessment procedures and the NIST SP 800-53 Security and Privacy Controls for Federal Information Systems and Organizations to obtain a Risk Management Framework (RMF) authorization IAW DoDI 8510.01 for the MK 57 MOD 16-17 Systems. In FY 26 industry will support NSPO in the Resilient Hull, Mechanical and Electrical Security (RHIMES) effort to build an experimental software/hardware platform for the demonstration of the You Only Live Once (YOLO)-based controller resilience has been added. Title updated from Mod 14-17 to Mod 14-19 to reflect included Adaptable Deck Launcher (ADL) efforts across all P40A categories. [P40A / MK57 Mod 14-19 Safety]: Field Activity and design will provide a qualified system safety program Principal for Safety (PFS) and PFS safety engineering support for in service NSSMS MK57 system configurations. The PFS shall be responsible for executing the safety program, updating safety plans, and conducting safety analyses to support any certification or deployment requirements. Title updated from Mod 14-17 to Mod 14-19 to reflect included Adaptable Deck Launcher (ADL) efforts across all P40A categories. [P40A - 2 / Afloat Counter-Unmanned Aerial Systems (Afloat C-UAS)]: Afloat Counter-Unmanned Aerial Systems (C-UAS) provides cost-effective shipboard capability against Unmanned Aerial Systems (UAS) with defeat options such as missiles, loitering munitions, surface ship guns and directed energy systems. Supplemental funding was provided to rapidly field CUAS solutions for the Gerald R Ford Carrier Strike Group (CSG) which included the procurement of Longbow Hellfire launchers, Coyote launchers, and the installation/integration work. Funding was also provided to rapidly field CUAS solutions on the Theodore Roosevelt CSG to include Longbow Hellfire Launchers, Coyote launchers, and the installation/integration work. [P40A - 3 / RAM Launchers]: Rolling Airframe Missile (RAM) is a cooperative program executed under a series of Memorandums of Understanding between the U.S. and the Federal Republic of Germany. RAM is a high firepower missile used to defeat Anti-Ship Missiles (ASMs) and other anti-air warfare threats with no dependence on ship's fire control illuminators for terminal guidance. The RAM missile is fired from the RAM Guided Missile Launching System (GMLS) (MK-49) which holds 21 rounds. The MK 49 GMLS is installed on various platforms ranging from USN aircraft carriers (CVN) to Guided Missile Destroyers (DDGs). FY27 funding supports the hardware procurement and installation of Ordnance Alterations (ORDALT) to address safety, obsolescence, and enable the firing of new missile variants and supports procurement and installation of launchers on in-service DDGs in accordance with recent Naval Capability Board decision to outfit the ARLEIGH BURKE class destroyers with increased terminal defense capabilities. For ORDALTs the hardware production lead time is 24 months and installations are executed in accordance with Ship Maintenance Availability Schedules. The FY27 procurements include the Firepower ORDALT and the Shock Hardening ORDALT. The Firepower ORDALT is necessary to employ the latest and most capable RAM Block 2B missile. The Firepower ORDALT also supports launcher readiness by LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 2 of 53 P-1 Line #105 Volume 4 - 12 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A addressing obsolescence of multiple components in the legacy configuration. The Shock ORDALT will address safety deficiencies identified during testing that could render the launcher inoperable in the event of a major ship shock event. For launchers, the hardware production lead time is 30 months and installations are executed in accordance with Ship Maintenance Availability Schedules. FY27 RAM procurement quantities: (4) Firepower ORDALTs, (4) Shock Hardening ORDALTs, and (3) MK 49 GMLS. FY27 RAM installations: (6) Firepower ORDALTs, (6) Shock Hardening ORDALTs, and (3) MK 49 GMLS on in-service DDGs. [P40A - 4 / SeaRAM Close-In Weapon System (CIWS)]: SeaRAM Close-In Weapon System (CIWS) is a Detect-Thru-Engage terminal defense capability employed against Anti-Ship Cruise Missiles (ASCMs) and high-speed aircraft that penetrate outer defensive envelopes. SeaRAM is an autonomous combat system that searches, detects, tracks (radar and electro-optic), and engages threats with the Rolling Airframe Missile (RAM). SeaRAM holds 11 RAM rounds. FY2026 funding procures six SeaRAM mounts for installation on DDG class destroyers as well as a mount for the Surface Combat Systems Training Command (SCSTC), the OEM Design Agent and the In-Service Engineering Agent. [P40A - 5 / Ship Self Defense System]: The Ship Self Defense System (SSDS) is the core combat system control element for the Quick Reaction Combat Capability (QRCC) in aircraft carriers and amphibious assault ships, which defends against Anti-Ship Cruise Missiles (ASCM). Major changes from FY26 to FY27 are below: In FY27, the program is procuring 2 shipsets (1 LPD and 1 CVN), 1 Shore Site, 1 set of Shore Site GPNTS and CAC2S Afloat hardware. The Program is installing and conducting Year 2 advanced planning* for 2 future Ships installations, conducting Year 1 advanced planning** for 3 future Ship installations, conducting final checkout on 2 Ship installations. The program is installing 1 Shore Site system and advanced planning* for 1 future Shore Site installation. The Program is planning to conduct 2 CSSQT (1 LHD & 1 LPD), conduct Year 1 CSSQT advanced planning* for 2 future CSSQT events (1 LHA and 1 CVN). The program will procure tactical software builds and annual software licenses and certification. * Advanced Planning takes place over the 2 years prior to a ship installation ** Advanced Planning is done 1 year prior to a CSSQT event SSDS costs have increased as a result of transitioning to modernized Computing Infrastructure configuration, engineering changes to address diminishing manufacturing sources and obsolescence, and supply chain issues impacting material costs. Ship Installation Cost, includes advanced planning in each of the 2 years prior to an installation, varies per year depending on the quantities of ships, the mix of ship classes, the configuration of the specific hull (i.e., CVN, LHD, LHA, LPD, or LSD) and the geographical location of the CNO availability (e.g., Bremerton, Norfolk, San Diego). Installation cost is significantly higher than advanced planning and can cause large variations between years. Recently, the installation cost has increased due to a) installations in non-traditional locations (e.g., Bremerton) driven by the Coast-wide bid process which causes extensive travel costs, b) Delays in delivery of Ship Installation Drawings, and c) scope changes during the modernization window. Further apparent cost "increases" are due to aligning modernization-related work such as Combat System documentation updates within the modernization budget. CSSQT cost per year varies depending on the number of CSSQT events conducted and the advanced planning required future CSSQT events. The cost also varies depending on the mix of ship classes (i.e., CVN, LHD, LHA, LPD, or LSD) in any given year and the CS weapons configuration. CSSQT events cost are significantly higher than advanced planning costs. SSDS Description: SSDS integrates a diverse set of fire control loop sensors and weapons and C4I systems for each ship class (CVN68, CVN78, LHA6, LHD1, LPD17, LSD41 and LSD49 ship classes). SSDS MK 2 provides the capabilities for integrated air and missile defense, multi-warfare situational awareness, combat direction, and joint interoperability via the Cooperative Engagement Capability (CEC) and Tactical Digital Information Link (TADIL)-J (Link 16). LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 3 of 53 P-1 Line #105 Volume 4 - 13 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A SSDS MK 2 fielding continues with the new construction carriers (CVN 78 class), new construction amphibious ships (LHA 6, LPD 17 classes) and modernizing in-service SSDS MK 2 carriers (CVN 68 Class) and amphibious ships (LPD 17, LHD 1 and LHA 6 Classes). SSDS MK 2 integrates new combat system warfighting capabilities and improvements on a phased basis via phased software Capability Packages and COTS hardware modernization. SSDS MK 2 increases operational capabilities, improves combat readiness and Strike Group and Expeditionary Strike Group interoperability including, the Fire Control Loop Improvement Project (FCLIP), Far-Term Interoperability Improvement Project (FTIIP), and Task Force Cyber Awakening (TFCA) Boundary Defense Capability. SSDS MK 2 equips back-fit LHDs and CVNs with an upgraded Combat System Display, Automatic Status Board (ASTABS), Remote ASTAB Controllers, peripheral control stations and Advanced Sensor Distribution System (ASDS), as well as the SSDS MK 2 computing equipment. Hardware computing infrastructure baselines implements Commercial-Off-The-Shelf (COTS) configurations to sustain system production and support the incorporation of new war-fighting capabilities (MK 6 MOD X). Each individual ship is planned for a hardware computing infrastructure upgrade on an eight-to-ten-year interval to replace obsolescent COTS hardware, implement new technologies and support the fielding of these capabilities. Technology refresh of individual COTS components that are unprocurable or unsupported is handled on a case-by-case basis. Procurement of SSDS shore site equipment includes shore based SSDS equipment and full combat system suites for the Ship Combat Systems Center (SCSC), Wallops Island, Virginia; and the SSDS System Integration Lab (SIL), Lockheed Martin, Moorestown, New Jersey. The SIL is used to support early development testing of the SSDS Software against Models and Simulations before transiting to SCSC Wallops Island to be tested with Live Sensors. P40A exhibits for SSDS includes the following: UQ002 - Production engineering support for SSDS hardware. These efforts include monitoring vendor production contracts/production line issues, creating shipset lists, responding to contractor production questions, receiving and shipping of equipment, creating and communication a detailed production schedule, troubleshooting failed production equipment, assisting in Factory Acceptance Testing (FAT), identification of fixes required to correct production flaws, and assist in resolution production related problems during ship installations. UQ003 - Engineering Change Proposal (ECP) and Ship Change Document (SCD) for SSDS hardware. UQ004 - Training Documentation Changes for SSDS hardware. Review and update SSDS MK2 Operator Maintenance Courses. UQ005A/B - COTS engineering/Obsolescence Kits/Field Changes for SSDS hardware and CAC2S hardware. UQ005A - COTS/Obsolescence engineering support for SSDS hardware at headquarters and field activities. Cyber Security hardware component procurement, assembly & installation and support are reflected here. UQ005B - SSDS System procurement and CAC2S Hardware, to include, hardware procurement, Software licenses, installation documentation, and drawing specification of the defined SSDS COTS Conversion kits, dependent upon the shipboard or shore- site equipment configuration to include CAC2S Afloat components. UQ5IN - FMP Ship Units, installation planning and installation - The costs for each kit listed in the P-3a Description. SSDS kit funding provided to various contractors and field activities. The SSDS equipment procurement based on competitive contracts. Production lead-time for kits ranges from 12 months (for equipment COTS upgrade kits/field changes) up to 24 months for system COTS conversion kits for ships. Installation planning efforts are conducted in each of the 2 years prior to the start of the installation and includes the development and validation of Ship Installation Drawings (SIDs). Installation funds are required to be on contract and at field activities 90-150 days prior to installation start. UQ6IN - Non-FMP Shore Site units, installation planning and installation - Systems are required for SSDS/CS shore sites: The SSDS MK 2 System/Software Combat System Engineering Agent (SSDS System Integration Lab (SIL), Lockheed Martin, Moorestown, New Jersey); Surface Combat Systems Center (SCSC), Wallops Island. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 4 of 53 P-1 Line #105 Volume 4 - 14 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A UQ007 - Combat System Ship Qualification Trial (CSSQT). Combat System Ship Qualification Trials are designated for CVNs and AMPHIBs in accordance with NAVSEAINST 9093.1 (series). CSSQTs will validate installation and operation of Combat System upgrades and will ensure the crew can operate and maintain the new systems. UQ008 - Combat System Documentation & Waterfront Support provides for generation, update, and validation of CS documentation because of CS configuration changes during ship modernizations. This includes updates to Ship Selected Records, Combat System Operational Sequencing System, CS Capabilities and Limitations, Combat System Interface Diagrams, Combat System Alignment Manual and the Overall CS Operability Test. This also includes Combat System Project Engineers that coordinate with other SYSCOM elements for installation coordination and system of system testing with SSDS. CS documentation is produced for all CVN and Amphibious Class Ships undergoing Combat System SSDS MK 2 upgrades within the next 2 years. [P40A - 6 / AEGIS Support Equipment]: Provides equipment procurement and installation support for AEGIS Shore Facilities and Shipboard Upgrades to AEGIS Cruisers and Destroyers required to maintain the readiness of the AEGIS Weapon System in support of Combatant Commanders requirements. L7001: Special Tools & Test Equipment, MK-99 and SPY Procurements: Provides funding to procure and maintain special test equipment (Adaptive Diagnostic Electronic Portable Test Set (ADEPT)/Radiation Probes) to support Maintenance and Troubleshooting efforts for the AEGIS Weapon System on CG's, DDG's, and critical shore sites. Provides Mk 99 Missile Fire Control System (MFCS) illuminator and pedestal assembly parts refurbishment, creates a depot pool of refurbished illuminator and pedestal assemblies to support periodic maintenance replacement on AEGIS CG's and DDG's. L7003: Computers, Displays, and Simulators for Integrated Warfare Systems Laboratory: Provides funding to procure and maintain Integrated Warfare Systems Laboratory (IWSL) Weapons System and support infrastructure to support fleet issues resolution within the AEGIS Weapon System. (LBTS support stopped in FY13) L7006: Surface Combat Systems Center (SCSC): Provides funding to procure, maintain, and modernize SCSC's AEGIS Weapon System (AWS), AEGIS Combat System (ACS), and combat system infrastructure in support of Fleet development, integration, testing, and training requirements that are required to complete Weapon and Combat System Certification. L7007: AEGIS Training and Readiness Center (ATRC): Provides funding to procure, maintain, and modernize ATRC's AEGIS Weapon System (AWS), AEGIS Combat System (ACS), and combat system infrastructure in support of Fleet operator and maintenance training requirements. L7008: Combat System Engineering Development Site (CSEDS): Provides funding to procure, maintain, and modernize CSEDS's AEGIS Weapon System (AWS), AEGIS Combat System (ACS), and combat system infrastructure in support of Fleet development, integration, testing, and training requirements that are required to complete Weapon and Combat System Certification. L7011: AEGIS Weapon System Ship Change Procurement: Provides funding to address fleet hardware issues related to equipment obsolescence, high failure, diminishing manufacturing sources (DMS) or to reduce maintenance costs and improve AEGIS operational availability (Ao) for fleet readiness. Supported by L7600 for installation. L7012: AN-SPY-1D/D(V) Radar Enhancements (ALPS): AEGIS Linear Processing System (ALPS) program provides the AN/SPY-1D/D(V) radar with AAW improvements in a complex electronic environment. L7014: AEGIS SPY Wholeness: AEGIS SPY-1 Array Conversion: Convert LNA Arrays into standard SPY-1 configurations to support Battle-Spares requirement for AEGIS DDGs due to the shutdown of the SPY-1 production line. Address diminishing manufacturing source (DMS) issues and contribute to AEGIS wholeness and SPY operational availability. L7015: AEGIS SEARAM Integration and Installation Support: Provides integration and installation support for 4 forward deployed destroyers scheduled to receive the SEARAM upgrade. SEARAM is an anti-ship missile defense system that allows naval vessels to engage high-performance, supersonic, and subsonic threats. (SEARAM Integration completed in FY21) L7016: AEGIS TI-12H Backfit: Technology Insertion-12 Hybrid solution (TI-12H) is one of the compute infrastructures used to operate the AEGIS Weapon System on AEGIS cruisers and destroyers. The TI-12 compute infrastructure on some AEGIS Baseline 9 cruisers and destroyers is being upgraded (back-fitted) with a TI-12H to enable AEGIS Baseline 9 upgrades. (TI-12H Backfit completed in FY23) LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 5 of 53 P-1 Line #105 Volume 4 - 15 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A L7017: Integrated Combat System (ICS) Equipment: Procures MK 6 MOD X equipment for combat system Land Based Test Sites and Infrastructure as a Service (IaaS) ORDALT kits. IaaS provides automated and scalable processing, network, storage, and other resources provided to the consumer. It enables the decoupling of hardware (HW) and software (SW), and eliminates the dependencies on specific HW configurations. IaaS enables the use of all available compute, storage, and network resources, while providing capacity for future growth and capability expansion. IaaS is a key component in our transition to an ICS. The MK 6 MOD X compute infrastructure will be developed with an IaaS capability. The IaaS ORDALT kits will enable IaaS capability on legacy TI-16 MK 6 MOD 0 and TI-16 MK 6 MOD 1 compute infrastructures in the fleet today. (Effort shifted to ICS in FY24) L7018: Enhanced Collection System (ECS) Procurement and Install Support: Provides procurement and installation activities of ECS to support, update, and maintain a centralized, modern data collection and processing capability to Aegis CG's & DDG's. L7019: AEGIS Depot Maintenance Support: Provides Depot Maintenance Facility to maintain AEGIS CG's & DDG's. L7020: AEGIS BMD Software and Hardware. Provides funding for the procurement, installation, fielding, and deployment of integrated Aegis BMD combat system to operational ships and sites for homeland and regional defense. Provides installation of hardware and software components required to support updated to AEGIS BL 5.4 and 9 Configurations as required to address critical gaps and support fleet Requirements. Provide procurement and fielding of new BMD components impacted by DMS within the BMD 5.x and 4.x configurations. L7027: Software license procurements in support of DDGs. L7600: AEGIS Weapon System Ship Change Installation: Provides funding for ORDALT installation and other Ship Changes designed to improve AEGIS Combat System readiness. Supported by L7011 for procurement. [P40A - 7 / Integrated Combat System (ICS) Equipment]: Procures Infrastructure as a Service (IaaS) Equipment to support combat system Land Based Test Sites and shipsets in support of DDG, FFG and US Coast Guard WMSM installations. IaaS provides automated and scalable processing, network, storage, and other resources provided to the consumer. It enables the decoupling of hardware (HW) and software (SW) and eliminates the dependencies on specific HW configurations. IaaS enables the use of all available compute, storage, and network resources, while providing capacity for future growth and capability expansion. IaaS is a key component in our transition to an ICS. The MK 6 MOD X compute infrastructure will be developed with an IaaS capability. The IaaS ORDALT kits will enable IaaS capability on legacy TI-16 MK 6 MOD 0 and TI-16 MK 6 MOD 1 compute infrastructures in the fleet today. [P40A - 8 / MK57 SUPPORT EQUIPMENT]: The MK 57 Vertical Launch System (VLS) is unique to the DDG 1000 class. Each ship has 80 total cells grouped into 20 four-cell modules. Flight 1 missiles to be carried on DDG 1000 include: Enhanced Sea Sparrow Missile (ESSM), Standard Missile-2 (SM-2) Blk III and Tomahawk Land Attack Missile (TLAM) Blk III/IV. This 80-cell VLS design requires a Canister Electronic Unit (CEU) for each cell containing a missile. MK57 VLS support equipment costs include hardware/software, technical refresh, Installation and Checkout (INCO) material, testing requirements, logistics, obsolescence, and training requirements. [P40A - 8 / MK57 UCEU INTEGRATED LOGISTICS SUPPORT]: MK57 VERTICAL LAUNCH SYSTEM (VLS) UNIVERSAL CANISTER ELECTRONICS UNIT(UCEU) INTEGRATED LOGISTICS SUPPORT: Funds provided for systems engineering, testing, engineering changes, and cyber security accreditation. This funding line also provides for development of training curriculum, depot repair procedures, and logistics required to maintain compatibility and interoperability with Total Ship Computing Environment (TSCE) combat system on DDG 1000 Class. MK57 VERTICAL LAUNCH SYSTEM (VLS) UCEU HARDWARE PROCUREMENT: delivery of HW complete. [P40A - 9 / Vertical Launch Systems]: The MK-41 Vertical Launching System (VLS) is a surface combatant missile launching system, designed to store, select and launch various SM configurations, TLAM, Tactical TLAM, ESSM, and VLA. The MK-41 VLS significantly improves missile capacity, flexibility, multi-mission capability, reaction time and rate of fire and is designed to be adaptable to present and future weapon systems. Current configurations are: two 61 cell launchers, forward and aft, for 22 TICONDEROGA (CG 47) Class Cruisers beginning with CG-52; one 61 cell aft and one 29 cell launcher forward for 28 ARLEIGH BURKE (DDG 51) Class Destroyers; and one 64 cell launcher aft and one 32 cell launcher forward for 34 DDG 51 FLT IIA ships. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 6 of 53 P-1 Line #105 Volume 4 - 16 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The OPN requirements procure Engineering Change Proposals/Ordnance Alterations (ECP/ORDALT) and funds sustaining engineering support for Fleet investigations and safety issues. Funds are required for Fleet operational availability, capability, safety and survivability. There are no significant increases or decreases in this program. [P40A - 9 / VLS PRODUCTION ENGINEERING]: The OPN requirements procure Engineering Change Proposals/Ordnance Alterations (ECP/ORDALT) and funds sustaining engineering support for Fleet investigations and safety issues. Funds are required for Fleet operational availability, capability, safety and survivability. [P40A - 9 / FY25 Israel PDA (Tranche 5 and 6)]: 5/6 = Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) [P40A - 11 / OTH Weapon System]: FY26 increase due to 4 OTH WS procurements for LCS Freedom FY27 & FY28 increase due to 3 & 2 OTH WS procurements for DDG [P40A - 11 / OTH PROCUREMENT]: FY26 increase due to 4 OTH WS procurements for LCS Freedom Class FY27 & FY28 increase due to 3 & 2 OTH WS procurements for DDG [P40A - 11 / OTH WS INSTALLATION]: FY26 OTH Installation increase due to Freedom installation acceleration. [P40A - 11 / OTH WS INSTALLATION]: FY26 increase due to 4 OTH WS procurements for LCS Freedom Class FY27 & FY28 increase due to 3 & 2 OTH WS installation for DDG LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 7 of 53 P-1 Line #105 Volume 4 - 17 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a NATO SEASPARROW - / 91.985 - / 18.611 P-40a Afloat Counter-Unmanned Aerial Systems (Afloat C-UAS) - / 23.085 - / 24.945 P-40a RAM Launchers - / 25.870 - / 2.000 - / 2.042 P-40a SeaRAM Close-In Weapon System (CIWS) / - - / 71.470 P-40a Ship Self Defense System - / 176.424 - / 24.150 - / 27.868 - P-40a AEGIS Support Equipment - / 853.537 - / 113.988 - / 187.988 - P-40a Integrated Combat System (ICS) Equipment - / 20.134 - / 24.134 - / 27.333 - P-40a MK57 SUPPORT EQUIPMENT - / 40.661 - / 0.235 - / 0.223 P-40a Vertical Launch Systems - / 6.913 - / 43.209 - / 1.568 P-40a ANTI SHIP MISSILE DECOY SYSTEM P-5a, P-21 - / 169.079 P-40a OTH Weapon System P-5a - / 52.891 P-40a DRAKE - / 0.154 - / 0.151 - / 0.130 P-3a 1 / NATO SEASPARROW (NSSMS Mk 57) - / 87.343 - / 14.840 - / 15.743 - / 42.472 - / 0.000 - / 42.472 P-3a 2 / UR006 RAM LAUNCHERS (NON-FMP Install) - / 78.990 - / 84.793 - / 55.985 - / 55.700 - / 0.000 - / 55.700 P-3a 3 / UQ005B - SSDS COTS CONVERSION KITS (TBD) - / 547.548 - / 73.298 - / 64.245 - / 80.048 - / 0.000 - / 80.048 P-40 Total Gross/Weapon System Cost / 2,174.614 - / 431.830 - / 527.292 - / 431.069 - / 0.000 - / 431.069 - P-5a, P-21 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 0.000 - - - / / 7.476 / 50.282 - - - / 20.943 - / - / - - / - / 2.085 - / - / - - / - / 22.624 - / - - / 22.624 / 167.385 - / - - / 167.385 / 11.993 - / - - / 11.993 - / 0.174 - / - - / 0.174 - / 1.072 - / - - / - - / - / 26.573 - / - / - - / / 22.415 - / - - - / 20.943 - - / - / 1.072 - - / - / / 2.085 / / 26.573 - / - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a NATO SEASPARROW - / - - / - - / - - / - - / - - / - P-40a Afloat Counter-Unmanned Aerial Systems (Afloat C-UAS) - / - - / - - / - - / - - / - - / - P-40a RAM Launchers - / - - / - - / - - / - - / - - / - P-40a SeaRAM Close-In Weapon System (CIWS) - / - - / - - / - - / - - / - - / - P-40a Ship Self Defense System - / - - / - - / - - / - - / - - / - P-40a AEGIS Support Equipment - / - - / - - / - - / - - / - - / - P-40a Integrated Combat System (ICS) Equipment - / - - / - - / - - / - - / - - / - P-40a MK57 SUPPORT EQUIPMENT - / - - / - - / - - / - - / - - / - P-40a Vertical Launch Systems - / - - / - - / - - / - - / - - / - P-40a ANTI SHIP MISSILE DECOY SYSTEM P-5a, P-21 - / - - / - - / - - / - - / - - / - P-40a OTH Weapon System P-5a - / - - / - - / - - / - - / - - / - P-40a DRAKE - / - - / - - / - - / - - / - - P-3a 1 / NATO SEASPARROW (NSSMS Mk 57) - / 43.577 - / 52.253 - / 52.865 - / 53.818 P-3a 2 / UR006 RAM LAUNCHERS (NON-FMP Install) - / 54.257 - / 54.763 - / 56.627 - / 57.730 LI 5231 - Ship Missile Support Equipment Navy P-5a, P-21 UNCLASSIFIED Page 8 of 53 P-1 Line #105 - / 25.009 / 1,010.216 - / / 387.920 / 1,509.061 Volume 4 - 18 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 3 / UQ005B - SSDS COTS CONVERSION KITS (TBD) - / 85.869 - / 79.490 - / 78.042 - / 80.444 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 415.368 - / 391.399 - / 411.245 - / 421.136 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: DRAKE: Technical Correction Realigned funds to EOD CREW Budget Exhibit LI 5509. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 9 of 53 P-1 Line #105 Volume 4 - 19 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: NATO SEASPARROW FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 2) New P40A Grouping 2.1) Mk57 Mod 12-15 Modernization A 2.2) Mk57 Mod 14-17 Modernization A - - 64.337 - - - - - - - - - - - - - - - - - 10.836 - - - - - - - - - - - - - - - - - 75.173 - - - - - - - - - - - - - - - - - 16.812 - - 4.067 - - 3.236 - - - - - - - - - - - - - - 5.226 - - 33.035 - - 13.316 - - - - - 13.316 - - - - - 2.622 - - 3.154 - - 1.406 - - - - - 1.406 - - - - - 3.623 - - 5.236 - - 2.805 - - - - - 2.805 - - - - - 2.355 - - 4.791 - - 2.605 - - - - - 2.605 - - - - - 0.718 - - 0.830 - - 0.811 - - - - - 0.811 Subtotal: 3) MK57 MOD 14-19 Modernization - - 16.812 - - 18.611 - - 50.282 - - 20.943 - - - - - 20.943 Total - - 91.985 - - 18.611 - - 50.282 - - 20.943 - - - - - 20.943 Subtotal: 2) New P40A Grouping 3) MK57 MOD 14-19 Modernization 3.1) Launcher MinMod BLK 2 Capability Upgrade A 3.2) MK57 Mod 14-19 Engineering A 3.3) MK57 Mod 14-19 Logistics A 3.4) MK57 Mod 14-19 Depot A 3.5) MK57 Mod 14-19 Cyber A 3.6) MK57 Mod 14-19 Safety A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 10 of 53 P-1 Line #105 Volume 4 - 20 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Afloat Counter-Unmanned Aerial Systems (Afloat C-UAS) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) .1) Afloat Counter-Unmanned Aerial Systems (Afloat C-UAS) 1.1) Afloat CounterUnmanned Aerial Systems (Afloat C- A - - 23.085 - - 24.945 - - - - - - - - - - - - Subtotal: .1) Afloat CounterUnmanned Aerial Systems (Afloat CUAS) - - 23.085 - - 24.945 - - - - - - - - - - - - Total - - 23.085 - - 24.945 - - - - - - - - - - - - UAS) (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Afloat Counter-Unmanned Aerial Systems (C-UAS): FY2024 and FY2025 funding utilized to rapidly field CUAS solutions for the Gerald R Ford Carrier Strike Group (CSG) and the Theodore Roosevelt CSG, which included the procurements of Longbow Hellfire launchers, procurements of Coyote launchers, installations, and integration work. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 11 of 53 P-1 Line #105 Volume 4 - 21 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) 1) UR006 RAM Launchers Production Support 1.1) UR006 RAM Launchers Production Support A Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: RAM Launchers FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (2) - - 20.031 - - 2.000 - - 2.042 - - 2.085 - - - - - 2.085 - - 20.031 - - 2.000 - - 2.042 - - 2.085 - - - - - 2.085 - - 5.839 - - - - - - - - - - - - - - - Subtotal: 2) UR901 Systems Improvements - - 5.839 - - - - - - - - - - - - - - - Total - - 25.870 - - 2.000 - - 2.042 - - 2.085 - - - - - 2.085 Subtotal: 1) UR006 RAM Launchers Production Support 2) UR901 Systems Improvements 2.1) UR901 System Improvement A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (2) RAM Launchers Production support is an annual requirement which supports all on-going production and installation efforts. It provides Design Agent engineering and field activity support to ensure that the build to print Technical Data Package (TDP) remains up to date and the designs remain producible. It also provides contractor and government in-house critical engineering and technical support of the production line and production test equipment. Efforts include the technical investigation and resolution of production issues, resolution of test equipment issues, configuration management, reliability assessments, safety, and product acceptance efforts. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 12 of 53 P-1 Line #105 Volume 4 - 22 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code .1) Ship Missile Support Equipment 1) SeaRAM CloseIn Weapon System A Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SeaRAM Close-In Weapon System (CIWS) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (3) - - - - - - - - 71.470 - - - - - - - - - Subtotal: .1) Ship Missile Support Equipment - - 0.000 - - - - - 71.470 - - - - - - - - - Total - - 0.000 - - - - - 71.470 - - - - - - - - - (CIWS) (4) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (3) (4) FY2026 funding procures six SeaRAM mounts for installation on DDG class destroyers as well as a mount for the Surface Combat Systems Training Command (SCSTC), the OEM Design Agent and the In-Service Engineering Agent. FY2026 funding procures six SeaRAM mounts for installation on DDG class destroyers as well as a mount for the Surface Combat Systems Training Command (SCSTC), the OEM Design Agent and the In-Service Engineering Agent. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 13 of 53 P-1 Line #105 Volume 4 - 23 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Ship Self Defense System FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Ship Self Defense System (SSDS) 1.1) UQ002 - SSDS A - - 33.121 - - 8.785 - - 9.722 - - 7.032 - - - - - 7.032 - - 4.767 - - 1.027 - - 1.345 - - 1.010 - - - - - 1.010 - - 9.095 - - 1.159 - - 1.430 - - 0.590 - - - - - 0.590 - - 21.502 - - 0.840 - - 0.441 - - 0.398 - - - - - 0.398 - - 77.069 - - 7.095 - - 9.258 - - 9.004 - - - - - 9.004 - - 30.870 - - 5.244 - - 5.672 - - 4.590 - - - - - 4.590 Subtotal: 1) Ship Self Defense System (SSDS) - - 176.424 - - 24.150 - - 27.868 - - 22.624 - - - - - 22.624 Total - - 176.424 - - 24.150 - - 27.868 - - 22.624 - - - - - 22.624 Production Support (5) 1.2) UQ003 - SSDS ECP / SCD (6) 1.3) UQ004 - SSDS Training (7) A A 1.4) UQ005A SSDS COTS Eng/ Obsolescence Kits A 1.5) UQ007 Combat System Ship Qualification Trial A (CSSQT) (8) 1.6) UQ008 Combat System Documentation & Support A (9) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (5) UQ002 - funding provides required Production support efforts for various ship hulls. Costs will vary per year depending on the quantities of ships, the mix of ship classes (i.e., CVN, LHD, LHA, LPD, or LSD) and the CS weapons configuration. (6) UQ003 - funding provides required SSDS ECP / SCD efforts for various ship hulls. Costs will vary per year depending on the quantities of ships, the mix of ship classes (i.e., CVN, LHD, LHA, LPD, or LSD) and the CS weapons configuration. (7) (8) UQ004 - funding provides required SSDS Training efforts for various ship hulls. Costs will vary per year depending on the quantities of ships, the mix of ship classes (i.e., CVN, LHD, LHA, LPD, or LSD) and the CS weapons configuration. UQ007 - CSSQT Advanced Planning is conducted 1 year prior to the execution of a CSSQT event SSDS CSSQT in FY27 (total $9,004K) includes: $7,004K for conduct of 2 CSSQT events (1 LHD and 1 LPD) $2,000K for Advanced Planning for 2 future CSSQT events (1 LHA and 1 CVN). CSSQT cost per year vary depending on the number of CSSQT events conducted and the advanced planning required for the number of future ships CSSQT events. The cost also varies depending on the mix of ship classes (i.e., CVN, LHD, LHA, LPD, or LSD) in any given year and the CS weapons configuration. CSSQT events cost are significantly higher than advanced planning costs. (9) UQ008 - Combat System Documentation & Waterfront Support provides for generation, update, and validation of CS documentation because of CS configuration changes during ship modernization including Ship Selected Records, Combat System Operational Sequencing System, CS Capabilities and Limitations, Combat System Interface Diagrams, Combat System Alignment Manual and the Overall CS Operability Test. This also includes Combat System Project Engineers that coordinate with other SYSCOM elements for installation coordination and system of system testing with SSDS. CS documentation is produced for all CVN and Amphibious Class Ships undergoing Combat System SSDS MK 2 upgrades. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 14 of 53 P-1 Line #105 Volume 4 - 24 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: AEGIS Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) (10) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Aegis Support Equipment 1.1) L7001 - Depot Special Tooling/Test Equipment A 1.2) L7003 Integrated Warfare Systems Laboratory A 1.3) L7006 - Surface Combat Systems A Center Equipment (11) 1.4) L7007 - Aegis Training and Readiness Center Upgrade - - 50.990 - - 10.934 - - 9.023 - - 7.952 - - - - - 7.952 - - 1.317 - - - - - - - - - - - - - - - - - 135.060 - - 15.037 - - 8.294 - - 10.112 - - - - - 10.112 - - 80.156 - - 4.896 - - 5.032 - - 5.380 - - - - - 5.380 - - - - - 1.130 - - 1.450 - - 2.640 - - - - - 2.640 - - 102.674 - - 6.107 - - 23.628 - - 42.102 - - - - - 42.102 - - 115.033 - - 20.792 - - 82.928 - - 7.580 - - - - - 7.580 - - 203.872 - - 16.885 - - 6.330 - - 6.750 - - - - - 6.750 - - 8.256 - - - - - - - - - - - - - - - - - 56.100 - - - - - - - - - - - - - - - - - 16.500 - - - - - - - - - - - - - - - - - - - - 7.700 - - 8.500 - - 8.000 - - - - - 8.000 - - - - - 15.929 - - 19.996 - - 19.338 - - - - - 19.338 A (12) 1.5) L7008 - Combat System Engineering Development Site (CSEDS) A (13) 1.6) L7011 - Aegis Weapon System Ship Change Procurement A 1.7) L7012 - SPY 1D/DV Radar Enhancements A (14) (ALPS) (15) 1.8) L7014 - SPY Wholeness A 1.9) L7015 - AEGIS SEARAM Integration and Installation Support A 1.10) L7016 - AEGIS TI12H Backfit A 1.11) L7017 Integrated Combat System Equipment A 1.12) L7018 Enhance Collection System (ECS) Proc & Install Support A 1.13) L7019 - AEGIS Depot Maintenance Support A LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 15 of 53 P-1 Line #105 Volume 4 - 25 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.15) L7027 Computer Program A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: AEGIS Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) (10) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - - - - - - - 10.100 - - - - - 10.100 - - 83.579 - - 14.578 - - 22.807 - - 47.431 - - - - - 47.431 Subtotal: 1) Aegis Support Equipment - - 853.537 - - 113.988 - - 187.988 - - 167.385 - - - - - 167.385 Total - - 853.537 - - 113.988 - - 187.988 - - 167.385 - - - - - 167.385 Software Licenses (16) 1.16) L7600 - Aegis Support Equipment Installation (17) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (10) Provides equipment procurement and installation support for AEGIS Shore Facilities and Shipboard Upgrades to AEGIS Cruisers and Destroyers required to maintain the readiness of the AEGIS Weapon System in support of Combatant Commanders requirements. Combat System Procurements: L7001: Special Tools & Test Equipment, MK-99 and SPY Procurements. L7003: Computers, Displays, and Simulators for Integrated Warfare Systems Laboratory (IWSL) at Dahlgren, VA. L7006: Weapon/Combat System Equipment for Surface Combat System Center (SCSC) at Wallops Island, VA. L7007: Weapon/Combat System Equipment for AEGIS Readiness Training Center (ATRC) at Dahlgren, VA. L7008: Weapon/Combat System Equipment for Combat System Engineering Development Site (CSEDS) at Moorestown, NJ L7011: AEGIS Weapon System Procurements to support Ship Change Documents. L7012: AEGIS Weapon System Procurements to support AEGIS SPY-1D/DV Enhancements for AEGIS DDGs (ALPS). L7014: AEGIS SPY Wholeness to convert 8 LNA Arrays to SPY-1 for fleet Battle Spares. L7015: AEGIS Integration and Installation support for 4 DDG to receive SEARAM upgrade. (Effort completed in FY21) L7016: AEGIS Baseline 9 upgrades. (Effort completed in FY23) L7017: Integrated Combat System (ICS) Equipment. Procures MK 6 MOD X equipment for LBTS and Infrastructure as a Service (IaaS) ORDALT kits for ships. (Effort Shifts to ICS in FY24) L7018: Enhanced Collection System (ECS) Equipment procurement and installation support. L7019: AEGIS Depot Maintenance support. L7020: AEGIS BMD Software and Hardware. L7027: AEGIS Software License Procurements including Red Hat Enterprise Linux (RHEL) and others as required to support AEGIS DDGs. L7600: AEGIS Installation support for approved ship changes. (11) (12) (13) (14) (15) (16) (17) L7006 - Surface Combat Systems Center Equipment; FY27 increases due to planned phasing of hardware procurements for AEGIS Land Based Test Site (LBTS) required to maintain test and certification plans. L7007 - Aegis Training and Readiness Center Upgrade: FY27 increases due to AEGIS LBTS hardware configuration updates required to maintain test and certification plans. L7008 - Combat System Engineering Development Site (CSEDS): FY27 increases due to AEGIS LBTS hardware configuration updates required to maintain test and certification plans. L7011 - Aegis Weapon System Ship Change Procurement: FY26 & FY27 increase due to FLT I DDG Service Life Extension. L7012 - SPY 1D/DV Radar Enhancements (ALPS): FY27 decrease due to planned transition to ALPS Tech Refresh Procurement. L7027 - FY27 Increase to support RHEL 6.5 Software License procurement requirements to address cyber requirements and address cost increase due to software obsolescence. L7600 - Aegis Support Equipment Installation: FY27 increase is required to field ORDALTS to maintain the operational readiness of AEGIS CG's & DDG's. FY26 increase due to FLT I DDG Service Life Extension. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 16 of 53 P-1 Line #105 Volume 4 - 26 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) .1) Infrastructure as a Service (IaaS) Equipment 1.1) Infrastructure as a Service (IaaS) Equipment A Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Integrated Combat System (ICS) Equipment FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (18) - - 20.134 - - 24.134 - - 27.333 - - Subtotal: .1) Infrastructure as a Service (IaaS) Equipment - - 20.134 - - 24.134 - - 27.333 - Total - - 20.134 - - 24.134 - - 27.333 - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 11.993 - - - - - 11.993 - 11.993 - - - - - 11.993 - 11.993 - - - - - 11.993 Footnotes: (18) Procures Infrastructure as a Service (IaaS) Equipment to support combat system Land Based Test Sites and shipsets in support of DDG, FFG and US Coast Guard WMSM installations. IaaS provides automated and scalable processing, network, storage, and other resources provided to the consumer. It enables the decoupling of hardware (HW) and software (SW),and eliminates the dependencies on specific HW configurations. IaaS enables the use of all available compute, storage, and network resources, while providing capacity for future growth and capability expansion. IaaS is a key component in our transition to an ICS. The MK 6 MOD X compute infrastructure will be developed with an IaaS capability. The IaaS ORDALT kits will enable IaaS capability on legacy TI-16 MK 6 MOD 0 and TI-16 MK 6 MOD 1 compute infrastructures in the fleet today. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 17 of 53 P-1 Line #105 Volume 4 - 27 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: MK57 SUPPORT EQUIPMENT FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) MK57 Support Equipment 1.1) MK57 UCEU INTEGRATED LOGISTICS SUPPORT A 1.2) MK57 UCEU HARDWARE PROCUREMENT A - 171,170.00 - 6.427 - - 0.235 - - 0.223 - - 0.174 - - - - - 0.174 200 34.234 - - - - - - - - - - - - - - - (19)(†) Subtotal: 1) MK57 Support Equipment - - 40.661 - - 0.235 - - 0.223 - - 0.174 - - - - - 0.174 Total - - 40.661 - - 0.235 - - 0.223 - - 0.174 - - - - - 0.174 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (19) MK57 VERTICAL LAUNCH SYSTEM (VLS) UNIVERSAL CANISTER ELECTRONICS UNIT(UCEU) PRODUCTION ENGINEERING and LOGISTICS SUPPORT: Funds provided for systems engineering, testing, engineering changes, cyber security accreditation, installation, production support, and hardware. This funding line also provides for development of training curriculum, depot repair procedures, and logistics required to maintain compatibility and interoperability with Total Ship Computing Environment (TSCE) combat system on DDG 1000 Class. MK57 VERTICAL LAUNCH SYSTEM (VLS) UCEU HARDWARE PROCUREMENT: MK57 VERTICAL LAUNCH SYSTEM (VLS) UCEU HARDWARE PROCUREMENT: Procures UCEU hardware necessary for DDG1001 & DDG1002 to have full missile capabilities for AAW, self-defense and land attack. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 18 of 53 P-1 Line #105 Volume 4 - 28 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Method/Type or Funding Vehicle Aggregated Items: MK57 SUPPORT EQUIPMENT Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Aug 2020 FY Contractor and Location 2021 Custom Manufacturing & Engineering, Inc. / Pinellas Park, Fl C / FFP NAVSEA FIELD ACTIVITY Mar 2021 Jan 2024 40 315,000.00 Y 2022 Custom Manufacturing & Engineering, Inc. / Pinellas Park, Fl C / FFP NAVSEA FIELD ACTIVITY Nov 2021 Jun 2024 40 265,000.00 Y Commonwealth Technology Innovation / Alexandria, VA C / FFP NAVSEA FIELD ACTIVITY Oct 2023 Jun 2024 40 275,850.00 Y (Each) 1) MK57 Support Equipment 1.2) MK57 UCEU HARDWARE PROCUREMENT (19)(†) 1.2) MK57 UCEU HARDWARE PROCUREMENT (19)(†) 1.2) MK57 UCEU HARDWARE PROCUREMENT (†) (19)(†) 2023 (20) indicates the presence of a P-21 Footnotes: (20) Custom Manufacturing and Engineering (CME) was unable to deliver a complete Universal Canister Electronics Unit (UCEU). In October 2023, the production of the UCEU control modules was removed from the CME contract and awarded to Commonwealth Technology Innovation (CTI). CME will continue to produce the UCEU power modules. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 19 of 53 P-1 Line #105 Volume 4 - 29 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: MK57 SUPPORT EQUIPMENT Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) MK57 Support Equipment 1.2) MK57 UCEU HARDWARE PROCUREMENT (19) Prior Years Deliveries: 80 1 2021 NAVY 40 0 40 2 2022 NAVY 40 0 40 3 2023 NAVY 40 0 40 A - - - - - - - - - - - - - - - - - - - 40 A - - - - - - - - - - - 40 40 O C T LI 5231 - Ship Missile Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #105 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 30 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: MK57 SUPPORT EQUIPMENT Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) MK57 Support Equipment 1.2) MK57 UCEU HARDWARE PROCUREMENT (19) Prior Years Deliveries: 80 1 2021 NAVY 40 0 40 - - - - - - - - - - - - - - - 40 2 2022 NAVY 40 0 40 - - - - - - - - - - - - - - - - - - - - 40 3 2023 NAVY 40 0 40 A - - - - - - - - 40 O C T LI 5231 - Ship Missile Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 53 S E P O C T N O V D E C J A N 0 F E B P-1 Line #105 M A R A P R M A Y J U N 0 0 J U L A U G S E P Volume 4 - 31 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Aggregated Items: MK57 SUPPORT EQUIPMENT Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Custom Manufacturing & Engineering, Inc. - Pinellas Park, Fl TBD 2 Custom Manufacturing & Engineering, Inc. - Pinellas Park, Fl TBD 3 Commonwealth Technology Innovation - Alexandria, VA TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 12 0 12 0 0 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 22 of 53 P-1 Line #105 Volume 4 - 32 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Vertical Launch Systems FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Vertical Launch Systems 1.1) VLS ORDALTS A 1.2) VLS PRODUCTION ENGINEERING A - - 4.493 - - 0.967 - - 1.299 - - 0.856 - - - - - 0.856 - - 1.854 - - 0.179 - - 0.205 - - 0.151 - - - - - 0.151 1.3) FY25 Israel PDA (Tranche 5 and 6) A - - - - - 42.000 - - - - - - - - - - - - - - 6.347 - - 43.146 - - 1.504 - - 1.007 - - - - - 1.007 - - 0.566 - - 0.063 - - 0.064 - - 0.065 - - - - - 0.065 Subtotal: 2) 5A5IN Install Equipment N86 - - 0.566 - - 0.063 - - 0.064 - - 0.065 - - - - - 0.065 Total - - 6.913 - - 43.209 - - 1.568 - - 1.072 - - - - - 1.072 Subtotal: 1) Vertical Launch Systems 2) 5A5IN Install Equipment N86 2.1) 5A5IN Install Equipment N86 (21) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (21) VLS ORDALT Installation LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 23 of 53 P-1 Line #105 Volume 4 - 33 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: ANTI SHIP MISSILE DECOY SYSTEM FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) VV002 - NULKA DECOYS 1.1) NULKA (†) A DECOYS Subtotal: 1) VV002 - NULKA DECOYS 1,477K 65 96.001 - - - - - - - - - - - - - - - - - 96.001 - - - - - - - - - - - - - - - - - 11.042 - - - - - - - - - - - - - - - - - 11.042 - - - - - - - - - - - - - - - 73 36.029 - - - - - - - - - - - - - - - - 36.029 - - - - - - - - - - - - - - - 2) VV830 - PRODUCTION ENGINEERING 2.1) PRODUCTION ENGINEERING A Subtotal: 2) VV830 - PRODUCTION ENGINEERING 3) VV004 - ADAP PAYLOAD 3.1) ADAP (†) A PAYLOAD Subtotal: 3) VV004 - ADAP PAYLOAD 493,547.95 - 5) VV003 - ENG CHANGE PROPOSALS (ECPs)/ILS SUPPORT 5.1) ECPs A 5.2) Logistics/ Production Support A Subtotal: 5) VV003 - ENG CHANGE PROPOSALS (ECPs)/ILS SUPPORT - - 5.184 - - - - - - - - - - - - - - - - - 16.721 - - - - - - - - - - - - - - - - - 21.905 - - - - - - - - - - - - - - - 4.102 - - - - - - - - - - - - - - - 6) VV001 - NULKA SYSTEMS 6.1) DECOY LAUNCHING SYSTEM A 683,666.67 6 Subtotal: 6) VV001 - NULKA SYSTEMS - - 4.102 - - - - - - - - - - - - - - - Total - - 169.079 - - - - - - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 24 of 53 P-1 Line #105 Volume 4 - 34 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Aggregated Items: ANTI SHIP MISSILE DECOY SYSTEM Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) VV002 - NULKA DECOYS 1.1) NULKA DECOYS (†) 2017 BAES / AUSTRALIA C / FFP US Embassy, Canberra Jun 2018 Aug 2019 21 1,456K Y 1.1) NULKA DECOYS (†) 2018 BAES / AUSTRALIA C / FFP US Embassy, Canberra Dec 2018 Feb 2020 25 1,235K Y 1.1) NULKA DECOYS (†) 2019 BAES / AUSTRALIA C / FFP US Embassy, Canberra Dec 2018 Dec 2020 7 1,900K Y (†) 2016 EXELIS / NJ C / FFP Naval Research Lab Apr 2016 Jun 2018 35 537,970.00 Y (†) 2017 EXELIS / NJ C / FFP Naval Research Lab Aug 2017 Nov 2019 38 452,632.00 Y 3) VV004 - ADAP PAYLOAD 3.1) ADAP PAYLOAD 3.1) ADAP PAYLOAD (†) indicates the presence of a P-21 LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 25 of 53 P-1 Line #105 Volume 4 - 35 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: ANTI SHIP MISSILE DECOY SYSTEM Fiscal Year 2016 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N J U L Calendar Year 2017 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) VV002 - NULKA DECOYS 1.1) NULKA DECOYS Prior Years Deliveries: 12 4 2017 NAVY 21 0 21 21 4 2018 NAVY 25 0 25 25 4 2019 NAVY 7 0 7 7 3) VV004 - ADAP PAYLOAD 3.1) ADAP PAYLOAD 5 2016 NAVY 35 0 35 5 2017 NAVY 38 0 38 A O C T LI 5231 - Ship Missile Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #105 M A R A P R M A Y J U N J U L - - 35 A - - 38 A U G S E P Volume 4 - 36 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: ANTI SHIP MISSILE DECOY SYSTEM Fiscal Year 2018 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) VV002 - NULKA DECOYS 1.1) NULKA DECOYS Prior Years Deliveries: 12 4 2017 NAVY 21 0 21 - - - - - - - - 4 2018 NAVY 25 0 25 A - - - - - - A - - - - - - - - - 1 - 2 18 25 4 2019 NAVY 7 0 7 A - - - - - - - - - - 7 - - - - 38 3) VV004 - ADAP PAYLOAD 3.1) ADAP PAYLOAD 5 2016 NAVY 35 0 35 - - - - - - - - 5 2017 NAVY 38 0 38 - - - - - - - - O C T LI 5231 - Ship Missile Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y 2 3 J U N 3 J U L 3 A U G UNCLASSIFIED Page 27 of 53 3 S E P 3 O C T 3 N O V 3 D E C 3 J A N 3 F E B P-1 Line #105 3 M A R 3 A P R 0 M A Y J U N J U L A U G S E P Volume 4 - 37 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: ANTI SHIP MISSILE DECOY SYSTEM Fiscal Year 2020 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) VV002 - NULKA DECOYS 1.1) NULKA DECOYS Prior Years Deliveries: 12 4 2017 NAVY 21 3 18 4 2018 NAVY 25 0 25 - 2 - 2 - 2 - 2 4 2019 NAVY 7 0 7 - - - - 1 1 2 2 2 2 2 3 2 2 2 2 - - - - - 0 2 - 2 - 2 - 2 - - 2 2 1 1 0 1 1 1 1 1 0 3) VV004 - ADAP PAYLOAD 3.1) ADAP PAYLOAD 5 2016 NAVY 35 35 0 5 2017 NAVY 38 0 38 0 O C T LI 5231 - Ship Missile Support Equipment Navy 2 N O V 3 D E C 3 J A N 4 F E B 3 M A R 3 A P R 4 M A Y 3 J U N 4 J U L 3 A U G UNCLASSIFIED Page 28 of 53 3 S E P 3 O C T 0 N O V D E C J A N F E B P-1 Line #105 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 38 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Production Rates (Each / Year) MFR Ref # Aggregated Items: ANTI SHIP MISSILE DECOY SYSTEM Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 BAES - AUSTRALIA 2 EXELIS - NJ 192 TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 6 12 18 0 0 12 12 0 0 12 12 0 0 12 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 29 of 53 P-1 Line #105 Volume 4 - 39 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] 1) OTH Weapon System ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: OTH Weapon System Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (22) 1.1) OTH PROCUREMENT A 1.2) OTH SUPPORT A (23)(†) 694,000.00 19 13.186 - - - 1,000K 4 4.000 1,002K 3 3.006 - - - 1,002K 3 3.006 - - 3.174 - - - - - - - - - - - - - - - - - 16.360 - - - - - 4.000 - - 3.006 - - - - - 3.006 - - 36.531 - - 7.476 - - 18.415 - - 23.567 - - - - - 23.567 Subtotal: 2) OTH WS INSTALLATION - - 36.531 - - 7.476 - - 18.415 - - 23.567 - - - - - 23.567 Total - - 52.891 - - 7.476 - - 22.415 - - 26.573 - - - - - 26.573 Subtotal: 1) OTH Weapon System 2) OTH WS INSTALLATION 2.1) OTH WS INSTALLATION (24) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (22) (23) (24) FY26 increase due to 4 OTH WS procurements for LCS Freedom FY27 & FY28 increase due to 3 & 2 OTH WS procurements for DDG FY26 increase due to 4 OTH WS procurements for LCS Freedom FY27 & FY28 increase due to 3 & 2 OTH WS procurements for DDG FY26 increase due to LCS Freedom installation acceleration FY27 & FY28 increase due to 3 & 2 OTH WS installation for DDG LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 30 of 53 P-1 Line #105 Volume 4 - 40 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Aggregated Items: OTH Weapon System Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) OTH Weapon System 1.1) OTH PROCUREMENT (23) 2019 Raytheon CO / Tucson, AZ C / FFP NAVSEA Oct 2018 Oct 2020 1 2,874K Y Feb 2017 1.1) OTH PROCUREMENT (23) 2020 Raytheon CO / Tucson, AZ C / FFP NAVSEA Feb 2020 Feb 2022 2 711,914.00 Y Feb 2017 1.1) OTH PROCUREMENT (23) 2021 Raytheon CO / Tucson, AZ C / FFP NAVSEA Mar 2021 Mar 2023 4 628,302.00 Y Feb 2017 1.1) OTH PROCUREMENT (23) 2022 Raytheon CO / Tucson, AZ C / FFP NAVSEA May 2022 May 2024 6 550,782.00 Y Feb 2017 1.1) OTH PROCUREMENT (23) 2023 Raytheon CO / Tucson, AZ C / FFP NAVSEA Mar 2023 Mar 2025 6 511,686.00 Y Feb 2017 1.1) OTH PROCUREMENT (23) 2026 Raytheon CO / Tucson, AZ C / FFP NAVSEA May 2026 May 2028 4 1,000K Y Feb 2017 LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 31 of 53 P-1 Line #105 Volume 4 - 41 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: DRAKE FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) .1) DRAKE- SUBMARINE WARFARE (N97) 1.2) Technical Insertion- Increment A - - 0.154 - - 0.151 - - 0.130 - - - - - - - - - Subtotal: .1) DRAKE- SUBMARINE WARFARE (N97) - - 0.154 - - 0.151 - - 0.130 - - - - - - - - - Total - - 0.154 - - 0.151 - - 0.130 - - - - - - - - - 1 (25) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (25) DRAKE SYSTEMS/TECH INSERTION UNDERSEA ENTERPRISE: Procures Engineering Change Proposals (ECPs) for DRAKE 2.0 systems and Retrofit Kits to upgrade DRAKE 1.0 Systems currently fielded onboard all Submarine Classes. DRAKE utilizes open software architecture and Software Defined Radios, enabling upgrades as threats evolve. DRAKE 2.0 capability will be developed and fielded in two increments and DRAKE 1.0 systems will be retrofit to 2.0. Technical Correction Realigned funds to EOD CREW Budget Exhibit LI 5509. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 32 of 53 P-1 Line #105 Volume 4 - 42 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 87.343 14.840 15.743 42.472 0.000 42.472 43.577 52.253 52.865 53.818 25.009 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 87.343 14.840 15.743 42.472 0.000 42.472 43.577 52.253 52.865 53.818 25.009 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / NATO SEASPARROW - - - - - - - - - - - 87.343 14.840 15.743 42.472 0.000 42.472 43.577 52.253 52.865 53.818 25.009 Total 387.920 387.920 387.920 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Equipment procurements on the P3a 1. Objective Configuration H/W line supports the NSSMS Mk57 Mod 14 (L class ships) for installation on six LHD 1 class ships. 2. Launcher Min-Mod to BLK 2 H/W line procures equipment required to support the BLK 2 capability on LHA/LHD/CVN Class ships. 3. A new transmitter replacement is in process to provide near term replacement of the obsolete MK73 Mod 3 Transmitter Group that can no longer be procured. 4. Launcher replacement program required for fielding of ESSM BLK 2 missile capability integrated in an optimized fashion. This effort is intended to replace 1970's era MK 29 Guided Missile Launching System (GMLS) which is growing obsolete. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 33 of 53 P-1 Line #105 Volume 4 - 43 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: MK 57 Modification Type: NSSMS Mk 57 Prior Years Financial Plan Modification Number / Title: 1 / NATO SEASPARROW FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 4: Objective Configuration A Kits Non-Recurring 1.1.1) Objective Configuration (LHD 1 Class Forward Fit H/W) - NonOrganic 4 / 40.453 - 1.1.2) Objective Configuration H/W (LHA/LHD/CVN) 5 / 1.034 1 / 0.218 Backfit - NonOrganic (26) Subtotal: Non-Recurring / 41.487 - / - - 2 / 0.225 / 0.218 - / - - / - 1 / 0.286 - / - 1 / 0.286 - / - - 1 / 0.295 - 1 / 0.302 - 1 / 0.313 / - 4 / 40.453 1 / 0.323 - / - 13 / 2.996 - / - - / - 1 / 0.286 1 / 0.295 1 / 0.302 1 / 0.313 1 / 0.323 - / - 17 / 43.449 1 / 1.134 1 / 0.302 1 / 0.256 1 / 0.213 - / - 1 / 0.213 1 / 0.221 1 / 0.229 1 / 0.236 - / - - / - 7 / 2.591 - - - / 0.313 - / 0.286 - / 0.302 / - 1 / 0.286 - / 0.295 / - 2 / 0.225 - / 0.286 / - 1 / 0.218 - / 0.225 / - 9 / 41.487 - Subtotal: Objective Configuration / - / 0.323 - / 0.000 - / 43.449 - Modification Item 2 of 4: Launcher Min-Mod to Blk 2 A Kits Non-Recurring 2.1.1) Launcher Min-Mod Blk 2 Capability H/W NonOrganic (27) Subtotal: Non-Recurring / 0.213 - / - / 0.236 - / - 1 / 1.134 / 1.134 1 / 0.302 1 / 0.256 1 / 0.213 - / - 1 / 0.213 1 / 0.221 1 / 0.229 1 / 0.236 - / - - / - 7 / 2.591 3 / 18.364 2 / 10.703 2 / 11.326 2 / 11.263 - / - 2 / 11.263 2 / 11.322 2 / 10.778 2 / 10.092 2 / 10.418 - / - 17 / 94.266 - Subtotal: Launcher Min-Mod to Blk 2 / 0.302 - / 0.256 - - - / 0.213 - / 0.221 - / 0.229 - / 0.000 - - / 2.591 Modification Item 3 of 4: MK9 Mod 2 CWTI Enhancement H/W Procurement A Kits Non-Recurring 3.1.1) MK 9 Mod 2 CWTI Enhancement H//W NonOrganic Subtotal: Non-Recurring Subtotal: MK9 Mod 2 CWTI Enhancement H/W Procurement / 18.364 - 3 / 18.364 - / 10.703 2 / 10.703 - / 11.263 - / - 2 / 11.326 / 11.326 2 / 11.263 - / - 2 / 11.263 2 / 11.322 2 / 10.778 2 / 10.092 2 / 10.418 - / - 17 / 94.266 1 / 26.764 - / - 1 / 26.764 1 / 27.608 1 / 28.478 1 / 29.375 1 / 30.034 - / - 5 / 142.259 / 26.764 - / - - - / 11.263 - / 11.322 - / 10.778 - / 10.092 - / 10.418 / 0.000 - - / 94.266 Modification Item 4 of 4: ESSM Adaptable Deck Launcher (ADL) A Kits Non-Recurring 4.1.1) Adaptable Deck Launcher (ADL) Procurement NonOrganic - (28) Subtotal: Non-Recurring LI 5231 - Ship Missile Support Equipment Navy - / - - / - - / - / 0.000 - / - - / - - UNCLASSIFIED Page 34 of 53 - / 26.764 - / 27.608 - / 28.478 P-1 Line #105 - / 29.375 - / 30.034 - / 0.000 - / 142.259 Volume 4 - 44 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: MK 57 Modification Type: NSSMS Mk 57 Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Subtotal: ESSM Adaptable Deck Launcher (ADL) Subtotal: Procurement, All Modification Items Modification Number / Title: 1 / NATO SEASPARROW - / - / 60.985 - - / - / 11.223 - - / - / 11.807 - 1 / 26.764 - / - / 38.526 - / - - 1 / 26.764 / 38.526 - 1 / 27.608 / 39.446 - 1 / 28.478 / 39.787 - 1 / 29.375 / 40.016 - 1 / 30.034 - - / - / 40.775 - / 0.000 5 / 142.259 / 282.565 - Installation Modification Item 1 of 4: Objective Configuration / 25.548 - / 2.299 - / 2.368 - / 2.189 - / 0.000 - / 2.189 - / 2.123 - / 2.338 - / 2.415 - / 2.468 - / 2.802 Modification Item 2 of 4: Launcher Min-Mod to Blk 2 - / 0.810 - / 0.000 - / 0.053 - / 0.055 - / 0.000 - / 0.055 - / 0.057 - / 0.059 - / 0.061 - / 0.000 - / 0.065 Modification Item 3 of 4: MK9 Mod 2 CWTI Enhancement H/W Procurement - / 0.000 - / 1.318 - / 1.515 - / 1.702 - / 0.000 - / 1.702 - / 1.951 - / 2.204 - / 2.270 - / 2.305 - / 4.826 - / 18.091 Modification Item 4 of 4: ESSM Adaptable Deck Launcher (ADL) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 7.865 - / 8.103 - / 8.270 - / 17.316 - / 41.554 / 26.358 - / 3.617 - / 3.936 - / 3.946 / - - / 3.946 - / 4.131 / 13.043 - / 25.009 Subtotal: Installation - - - - / 12.466 - / 12.849 - - / 44.550 - - / 1.160 / 105.355 Total Total Cost (Procurement + Support + Installation) LI 5231 - Ship Missile Support Equipment Navy 87.343 14.840 15.743 42.472 0.000 UNCLASSIFIED Page 35 of 53 42.472 43.577 52.253 P-1 Line #105 52.865 53.818 25.009 387.920 Volume 4 - 45 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NATO SEASPARROW MDAP/MAIS Code: Modification Item 1 of 4: Objective Configuration Manufacturer Information Manufacturer Name: NSWC Port Hueneme Division Manufacturer Location: Oxnard CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jul 2025 Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: Objective Configuration (LHD 1 Class Forward Fit H/W) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 4 / 14.900 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 4 / 14.900 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 14.900 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 4 / 14.900 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 Out 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 1 Method of Implementation: [none specified]:: Installation Name: Objective Configuration H/W (LHA/LHD/CVN) Backfit Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 10.648 1 / 2.299 1 / 0.000 - - - - - - - 0 / 0.000 5 / 12.947 LI 5231 - Ship Missile Support Equipment Navy / - / - UNCLASSIFIED Page 36 of 53 / - / - / - P-1 Line #105 / - / - Volume 4 - 46 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NATO SEASPARROW MDAP/MAIS Code: Modification Item 1 of 4: Objective Configuration Installation Information Method of Implementation: [none specified]:: Installation Name: Objective Configuration H/W (LHA/LHD/CVN) Backfit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - 1 / 2.368 - - / - - / - - / - - / - - / - 0 / 0.000 1 / 2.368 FY 2026 - / - - / - - / - 2 / 2.189 0 / 0.000 2 / 2.189 - / - - / - - / - - / - 0 / 0.000 2 / 2.189 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 2.123 - / - - / - - / - 0 / 0.000 1 / 2.123 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 2.338 - / - - / - 0 / 0.000 1 / 2.338 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.415 - / - 0 / 0.000 1 / 2.415 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.468 1 / 0.000 1 / 2.468 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.802 1 / 2.802 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Installation Cost Total 3 / 10.648 1 / 2.299 2 / 2.368 / - - 2 / 2.189 / - 0 / 0.000 2 / 2.189 1 / 2.123 1 / 2.338 1 / 2.415 0 / 2.468 / - 2 / 2.802 - / - 13 / 29.650 Installation Schedule FY 2025 PYS Q1 Q2 Q3 In 3 - - - Out 3 - - - FY 2026 Q4 Q1 Q2 Q3 1 - 1 - - 1 - - LI 5231 - Ship Missile Support Equipment Navy FY 2027 Q4 Q1 1 - - 1 FY 2028 FY 2029 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 1 1 - - - 1 - - - - 1 - - - - - - 1 1 1 UNCLASSIFIED Page 37 of 53 FY 2030 Q4 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 1 - - - - - - - 2 13 - - - - 2 13 1 - FY 2031 Q1 - P-1 Line #105 1 - 1 Volume 4 - 47 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NATO SEASPARROW MDAP/MAIS Code: Modification Item 2 of 4: Launcher Min-Mod to Blk 2 Manufacturer Information Manufacturer Name: NSWC Port Hueneme Division Manufacturer Location: Oxnard CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Jul 2025 Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: Launcher Min-Mod Blk 2 Capability H/W Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.810 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.810 FY 2025 - / - - / - 1 / 0.053 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.053 FY 2026 - / - - / - - / - 1 / 0.055 0 / 0.000 1 / 0.055 - / - - / - - / - - / - 0 / 0.000 1 / 0.055 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.057 - / - - / - - / - 0 / 0.000 1 / 0.057 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.059 - / - - / - 0 / 0.000 1 / 0.059 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.061 - / - 0 / 0.000 1 / 0.061 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.065 1 / 0.065 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.810 - / - 1 / 0.053 1 / 0.061 - / - 1 / 0.065 1 / 0.055 0 / 0.000 1 / 0.055 1 / 0.057 1 / 0.059 7 / 1.160 Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 1 - - - - - - 1 - - - 1 - - - - 1 - - - 1 - - - 1 - - - - 1 7 - - - - - - - - 1 - - - - - - - - - - 1 7 In Out FY 2026 PYS - 1 LI 5231 - Ship Missile Support Equipment Navy - 1 - UNCLASSIFIED Page 38 of 53 1 - P-1 Line #105 1 - 1 Volume 4 - 48 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NATO SEASPARROW MDAP/MAIS Code: Modification Item 3 of 4: MK9 Mod 2 CWTI Enhancement H/W Procurement Manufacturer Information Manufacturer Name: Saab Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 FY 2031 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: AIT:: Installation Name: MK 9 Mod 2 CWTI Enhancement H//W Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - 1 / 1.318 2 / 1.515 - / - - / - - / - - / - - / - 0 / 0.000 3 / 2.833 FY 2025 - / - - / - - / - 2 / 1.702 0 / 0.000 2 / 1.702 - / - - / - - / - - / - 0 / 0.000 2 / 1.702 FY 2026 - / - - / - - / - - / - - / - - / - 2 / 1.951 - / - - / - - / - 0 / 0.000 2 / 1.951 FY 2027 - / - - / - - / - - / - - / - - / - - / - 2 / 2.204 - / - - / - 0 / 0.000 2 / 2.204 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.270 - / - 0 / 0.000 2 / 2.270 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.305 2 / 0.000 2 / 2.305 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.376 2 / 2.376 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.450 2 / 2.450 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 1 / 1.318 2 / 1.515 / - - 2 / 1.702 / - 0 / 0.000 2 / 1.702 2 / 1.951 2 / 2.204 2 / 2.270 0 / 2.305 / - 6 / 4.826 - / - 17 / 18.091 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 1 - - 2 - - - 2 - - - - 2 - - - - 2 2 - - - - - - - 6 17 Out - - - - - 1 - - - - - - - - - - - - - 8 17 - LI 5231 - Ship Missile Support Equipment Navy 2 - - 2 - 2 UNCLASSIFIED Page 39 of 53 - - P-1 Line #105 2 Volume 4 - 49 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NATO SEASPARROW MDAP/MAIS Code: Modification Item 4 of 4: ESSM Adaptable Deck Launcher (ADL) Manufacturer Information Manufacturer Name: BAE Manufacturer Location: Minneapolis, MN Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 FY 2031 Delivery Dates Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: AIT:: Installation Name: Adaptable Deck Launcher (ADL) Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - 1 / 7.865 - / - - / - 0 / 0.000 1 / 7.865 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 8.103 - / - 0 / 0.000 1 / 8.103 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 8.270 1 / 0.000 1 / 8.270 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 8.526 1 / 8.526 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 8.790 1 / 8.790 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - 1 / 7.865 Installation Cost 1 / 8.103 0 / 8.270 / - - 3 / 17.316 / - 5 / 41.554 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 1 - - - - 1 - - - - - - 3 5 Out - - - - - - - - - - - - - - - - - - - - - 1 - - - - - - 4 5 - Footnotes: (26) This line provides funding for NSSMS MK 57 Mods 14/15 Objective Configuration Upgrades on CVN/LHD class ships. This effort consists mainly of Alteration Installation Team (AIT) efforts to remove the Q70s and install new cables and install updated software. This effort has very small hardware requirements. (27) (28) With the change in current Min Mod program technical approach which requires additional engineering and less hardware the hardware/install funding lines have been reduced. Title is update to Adaptable Deck Launcher (ADL) (previously Next Generation Launcher (NGL)). 1 Unit = 1 ADL Shipset LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 40 of 53 P-1 Line #105 Volume 4 - 50 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 78.990 84.793 55.985 55.700 0.000 55.700 54.257 54.763 56.627 57.730 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete - - - - - - - - - - 78.990 84.793 55.985 55.700 0.000 55.700 54.257 54.763 56.627 57.730 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / UR006 RAM LAUNCHERS - - - - - - - - - - 78.990 84.793 55.985 55.700 0.000 55.700 54.257 54.763 56.627 57.730 Total 1,010.216 1,509.061 1,010.216 1,509.061 1,010.216 1,509.061 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Rolling Airframe Missile (RAM) is a cooperative program executed under a series of Memorandums of Understanding between the U.S. and the Federal Republic of Germany. RAM is a high firepower missile used to defeat Anti-Ship Missiles (ASMs) and other anti-air warfare threats with no dependence on ship's fire control illuminators for terminal guidance. The RAM missile is fired from the RAM Guided Missile Launching System (GMLS) (MK-49) which holds 21 rounds. The MK 49 GMLS is installed on various platforms ranging from USN aircraft carriers (CVN) to Guided Missile Destroyers (DDGs). FY27 funding supports the hardware procurement and installation of Ordnance Alterations (ORDALT) to address safety, obsolescence, and enable the firing of new missile variants and supports procurement and installation of launchers on in-service DDGs in accordance with recent Naval Capability Board decision to outfit the ARLEIGH BURKE class destroyers with increased terminal defense capabilities. For ORDALTs the hardware production lead time is 24 months and installations are executed in accordance with Ship Maintenance Availability Schedules. The FY27 procurements include the Firepower ORDALT and the Shock Hardening ORDALT. The Firepower ORDALT is necessary to employ the latest and most capable RAM Block 2B missile. The Firepower ORDALT also supports launcher readiness by addressing obsolescence of multiple components in the legacy configuration. The Shock ORDALT will address safety deficiencies identified during testing that could render the launcher inoperable in the event of a major ship shock event. For launchers, the hardware production lead time is 30 months and installations are executed in accordance with Ship Maintenance Availability Schedules. FY27 RAM procurement quantities: (4) Firepower ORDALTs, (4) Shock Hardening ORDALTs, and (3) MK 49 GMLS. FY27 RAM installations: (6) Firepower ORDALTs, (6) Shock Hardening ORDALTs, and (3) MK 49 GMLS on in-service DDGs. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 41 of 53 P-1 Line #105 Volume 4 - 51 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: MK-49 GMLS / MK-15 SeaRAM Prior Years Financial Plan Modification Number / Title: 2 / UR006 RAM LAUNCHERS Modification Type: NON-FMP Install FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 2: RAM MK-49 GMLS ORDALTS B Kits Recurring 1.1.1) RAM MK-49 GMLS ORDALTS - NonOrganic 35 / 14.473 - / - - / - - 1.1.2) MK-49 GMLS Firepower ORDALT - NonOrganic 36 / 24.756 6 / 4.800 6 / 4.901 4 / 3.336 - / - 4 / 3.336 4 / 3.406 4 / 3.478 4 / 3.551 4 / 3.625 14 / 15.278 82 / 67.131 4 / 0.000 6 / 4.800 6 / 4.901 4 / 3.336 - / - 4 / 3.336 4 / 3.406 4 / 3.478 4 / 3.551 4 / 3.625 62 / 69.527 98 / 96.624 (29) 1.1.3) MK-49 GMLS Shock Hardening ORDALT NonOrganic (30) Subtotal: Recurring Subtotal: RAM MK-49 GMLS ORDALTS / 39.229 / - - - - - - - - / / - 8 / 6.672 8 / 6.812 8 / 6.956 8 / 7.102 8 / 7.250 76 / 84.805 215 / 178.228 - / 24.756 5 / 50.000 3 / 19.380 3 / 31.273 - / - 3 / 31.273 3 / 31.930 3 / 32.600 3 / 33.285 3 / 33.984 37 / 501.979 60 / 759.187 - 2 / 14.000 / - - / - - - - / 84.805 35 / 14.473 - - / 7.250 / - - - / 7.102 / - / 6.672 - / 6.956 / - 8 / 6.672 - / 6.812 / - 12 / 9.802 - / 6.672 / - 12 / 9.600 - / 9.802 / - 75 / 39.229 - / 9.600 / - / 178.228 - Modification Item 2 of 2: Launcher Procurements B Kits Recurring 2.1.1) Replace Phalanx with MK-49 RAM ORDALT NonOrganic 2.1.2) Replace Phalanx with SeaRAM ORDALT NonOrganic (31) Subtotal: Recurring Subtotal: Launcher Procurements Subtotal: Procurement, All Modification Items / - - / 24.756 - / 24.756 - / 63.985 / 64.000 - - / 73.600 - / 19.380 - 7 / 64.000 / - - / 29.182 - / 31.273 - / - 3 / 31.273 - / - / 37.945 - / - - 3 / 19.380 - - / - / 31.273 - - / 37.945 - / 31.930 - 3 / 31.273 / - - / 38.742 - / 32.600 - 3 / 31.930 / - - / 39.556 - / 33.285 - 3 / 32.600 / - - / 40.387 - / 33.984 - 3 / 33.285 / - 3 / 33.984 / 41.234 - - / - / 501.979 - 37 / 501.979 / 586.784 - 2 / 14.000 / 773.187 - 62 / 773.187 / 951.415 - Installation Modification Item 1 of 2: RAM MK-49 GMLS ORDALTS - Modification Item 2 of 2: Launcher Procurements Subtotal: Installation / 15.005 - - / 1.996 - / 0.000 / 0.000 - - / 10.874 / 0.319 - - / 25.501 / 1.302 - - / 15.759 - / 0.000 - / 15.759 - / 13.477 - / 13.821 - / 14.824 - / 15.050 - / 402.825 - / 512.131 / 15.005 - / 11.193 - / 26.803 - / 17.755 / - - / 17.755 - / 15.515 - / 15.207 - / 16.240 - / 16.496 - / 423.432 - / 557.646 - - / 1.996 - / 2.038 - / 1.386 - / 1.416 - / 1.446 - / 20.607 - / 45.515 Total Total Cost (Procurement + Support + Installation) LI 5231 - Ship Missile Support Equipment Navy 78.990 84.793 55.985 55.700 0.000 UNCLASSIFIED Page 42 of 53 55.700 54.257 54.763 P-1 Line #105 56.627 57.730 1,010.216 1,509.061 Volume 4 - 52 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UR006 RAM LAUNCHERS MDAP/MAIS Code: Modification Item 1 of 2: RAM MK-49 GMLS ORDALTS Manufacturer Information Manufacturer Name: Raytheon Co. Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Mar 2033 Manufacturer Name: Raytheon, Co Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Mar 2033 Installation Information Method of Implementation: NON-FMP Install:: Installation Name: RAM MK-49 GMLS ORDALTS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 35 / 10.414 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 35 / 10.414 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 35 / 10.414 35 / 10.414 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 35 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 35 Out 35 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 35 LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 43 of 53 P-1 Line #105 Volume 4 - 53 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UR006 RAM LAUNCHERS MDAP/MAIS Code: Modification Item 1 of 2: RAM MK-49 GMLS ORDALTS Installation Information Method of Implementation: NON-FMP Install:: Installation Name: MK-49 GMLS Firepower ORDALT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 30 / 4.591 - Prior Years 2 / 0.319 4 / 0.651 - / - - / - - / - - / - - / - 0 / 0.000 36 / 5.561 FY 2025 - / - - / - - / - 6 / 0.998 0 / 0.000 6 / 0.998 - / - - / - - / - - / - 0 / 0.000 6 / 0.998 FY 2026 - / - - / - - / - - / - - / - - / - 6 / 1.019 - / - - / - - / - 0 / 0.000 6 / 1.019 FY 2027 - / - - / - - / - - / - - / - - / - - / - 4 / 0.693 - / - - / - 0 / 0.000 4 / 0.693 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.708 - / - 0 / 0.000 4 / 0.708 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.723 0 / 0.000 4 / 0.723 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.738 4 / 0.738 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.753 4 / 0.753 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 3.175 14 / 3.175 4 / 0.723 22 / 4.666 82 / 14.368 Total 30 / 4.591 2 / 0.319 4 / 0.651 / - - 6 / 0.998 / - 0 / 0.000 6 / 0.998 6 / 1.019 4 / 0.693 4 / 0.708 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 30 - 1 1 - - 2 2 - 2 2 2 - 2 2 2 - 1 2 1 - 1 2 1 - 1 2 1 - 22 82 Out 30 - 2 2 2 2 1 2 1 2 1 2 22 82 - 1 1 - - 2 2 - 2 - 2 - 1 - 1 - 1 Method of Implementation: NON-FMP Install:: Installation Name: MK-49 GMLS Shock Hardening ORDALT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - 4 / 0.651 - - / - - / - - / - - / - - / - 0 / 0.000 4 / 0.651 FY 2025 - / - - / - - / - 6 / 0.998 0 / 0.000 6 / 0.998 - / - - / - - / - - / - 0 / 0.000 6 / 0.998 FY 2026 - / - - / - - / - - / - - / - - / - 6 / 1.019 - / - - / - - / - 0 / 0.000 6 / 1.019 FY 2027 - / - - / - - / - - / - - / - - / - - / - 4 / 0.693 - / - - / - 0 / 0.000 4 / 0.693 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.708 - / - 0 / 0.000 4 / 0.708 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.723 0 / 0.000 4 / 0.723 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.738 4 / 0.738 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.753 4 / 0.753 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 62 / 14.450 62 / 14.450 Installation Cost LI 5231 - Ship Missile Support Equipment Navy / - - / - UNCLASSIFIED Page 44 of 53 P-1 Line #105 Volume 4 - 54 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UR006 RAM LAUNCHERS MDAP/MAIS Code: Modification Item 1 of 2: RAM MK-49 GMLS ORDALTS Installation Information Method of Implementation: NON-FMP Install:: Installation Name: MK-49 GMLS Shock Hardening ORDALT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - 4 / 0.651 6 / 0.998 0 / 0.000 6 / 0.998 6 / 1.019 4 / 0.693 4 / 0.708 4 / 0.723 70 / 15.941 98 / 20.733 Total / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 2 2 - - 2 2 2 - 2 2 2 - 1 2 1 - 1 2 1 - 1 2 1 - 70 98 Out - - - - - 2 2 2 2 1 2 1 2 1 2 70 98 - - LI 5231 - Ship Missile Support Equipment Navy 2 2 - 2 - 2 UNCLASSIFIED Page 45 of 53 - 1 - P-1 Line #105 1 - 1 Volume 4 - 55 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UR006 RAM LAUNCHERS MDAP/MAIS Code: Modification Item 2 of 2: Launcher Procurements Manufacturer Information Manufacturer Name: Raytheon - Co Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Mar 2033 Manufacturer Name: Raytheon Com Manufacturer Location: Louisville KY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Mar 2033 Installation Information Method of Implementation: NON-FMP Install:: Installation Name: Replace Phalanx with MK-49 RAM ORDALT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 5 / 25.501 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 25.501 FY 2026 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 15.759 FY 2027 - / - - / - - / - - / - - / - - / - 3 / 13.477 - / - - / - - / - 0 / 0.000 3 / 13.477 FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 13.821 - / - - / - 0 / 0.000 3 / 13.821 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 14.824 - / - 0 / 0.000 3 / 14.824 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 15.050 0 / 0.000 3 / 15.050 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 19.084 3 / 19.084 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 37 / 383.741 37 / 383.741 Total - / - - / - 3 / 15.050 40 / 402.825 60 / 501.257 Installation Cost 3 / 15.759 5 / 25.501 0 / 0.000 3 / 15.759 3 / 15.759 0 / 0.000 3 / 15.759 3 / 13.477 3 / 13.821 3 / 14.824 / - - / - Installation Schedule FY 2025 FY 2026 PYS Q1 Q2 Q3 Q4 In - - - - - Out - - - - - FY 2027 Q1 Q2 Q3 Q4 5 - - - - - - - LI 5231 - Ship Missile Support Equipment Navy FY 2028 Q1 Q2 Q3 Q4 3 - - - - - - 5 FY 2029 Q1 Q2 Q3 Q4 3 - - - - - - 6 UNCLASSIFIED Page 46 of 53 FY 2030 Q1 Q2 Q3 Q4 3 - - - - - - - FY 2031 Q1 Q2 Q3 Q4 3 - - - - - - 3 P-1 Line #105 Q1 Q2 Q3 Q4 TC Tot 3 - - - 40 60 - 40 60 - 3 3 Volume 4 - 56 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UR006 RAM LAUNCHERS MDAP/MAIS Code: Modification Item 2 of 2: Launcher Procurements Installation Information Method of Implementation: NON-FMP Install:: Installation Name: Replace Phalanx with SeaRAM ORDALT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2 / 10.874 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Prior Years - / - FY 2025 - / - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 2 / 10.874 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 10.874 2 / 10.874 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - 2 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - 2 Footnotes: (29) The Firepower ORDALT is necessary to employ the latest and most capable RAM Block 2B missile. The Firepower ORDALT also supports launcher readiness by addressing obsolescence of multiple components in the legacy configuration. The hardware production lead time is 24 months and installations are executed in accordance with Ship Maintenance Availability Schedules. (30) The Shock Hardening ORDALT will address safety deficiencies identified during testing that could render the launcher inoperable in the event of a major ship shock event. The hardware production lead time is 24 months and installations are executed in accordance with Ship Maintenance Availability Schedules. (31) The hardware production lead time is 30 months and installations are executed in accordance with Ship Maintenance Availability Schedules. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 47 of 53 P-1 Line #105 Volume 4 - 57 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 73.298 64.245 80.048 0.000 80.048 85.869 79.490 78.042 547.548 547.548 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS 547.548 - - - - - - - - 73.298 64.245 80.048 0.000 80.048 85.869 79.490 78.042 - - - - - - - - 73.298 64.245 80.048 0.000 80.048 85.869 79.490 78.042 To FY 2031 Complete 80.444 Continuing - Continuing - 80.444 Continuing - Total - Continuing - - 80.444 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procurement for computing Infrastructure (CI) configuration for ship systems began in FY23. Estimates for the procurement and installation of kits varies on the specific ship class (CVNs, LPDs, LSDs, LHAs, and LHDs), and the existing configuration of the ship. The SSDS OPN UQ005 supports field changes to the in-service baselines, and the establishment of new baseline configurations at the shore sites. The cost for the kits varies significantly depending on the site, its existing configuration, and mission of the site. This includes procurement of hardware components for CAC2S Afloat. The SSDS procurement includes MK 6 MOD X equipment for the competitive CSEA contract for continuing the development of the SSDS MK 2 Build 12 baseline. Schedule changes are attributed to the Fleet changing ship modernization schedules to address operational requirements. The Program office over the 2022 budget cycle refined the Hardware and Software procurement costs and timelines. Additionally, all cost codes were evaluated to ensure tasking was accurately reported in the correct cost code. Starting in FY22 and out years, these refinements in lead times, costs, and cost code reporting have been implemented. Part of this refinement now documents software being procured over multiple years to account for the build of the tactical software load, procurement of software licenses (ie Red Hat, High Speed Guard) and annual software license renewals and certification. Additionally, this refinement documents the final installation checkout activities. In FY22 Cyber Security costs have been moved to UA005A cost code. In FY23, procurements are starting to transition from MK 6 MOD X configuration to the new configuration. This transition impacts cost for hardware, installation and advanced planning. The lead ship class will be the LPDs for the new CI configuration. Cost will vary based on the new CI configuration. FY27 procurements are transitioning to MK 6 MOD X with CVN 72 being the lead ship class. SSDS FY26 unit costs are: $ 17,575K for (1) LPD MK 6 MOD COTS Conversion Computing Infrastructure Kit $ 3,793K for (1) set of Shore Site internal components (GPNTS) $ 5,087K for SW tactical build, SW licenses, annual SW licenses and certification $ 5,092K for CAC2S Afloat 5 systems $ 442K for Cyber Security Total Cost for 1 ship System and 1 set of Shore Site internal components (GPNTS) units including SW & CAC2S Afloat in FY26 (UQ005B) is $31,989K SSDS Ship Installation Costs in FY26 (total $28,757K) include: LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 48 of 53 P-1 Line #105 Volume 4 - 58 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS MDAP/MAIS Code: $ 17,256K for AIT/DSA for installation of (1) CVN (MK 6 MOD X) $ 2,965K for final checkout on 1 Ships (LPD) $ 6,930K for Year 2 Advanced planning/DSA* for 1 future hull (LHA) $ 1,605K for Year 1 Advanced planning/DSA* for 1 future hull (LHD LPD) SSDS Shore Installation Costs in FY26 (total $3,499K) include: $ 2,555K 1 Shore Site Planning $ 944K 1 Shore Site installation and MCE 2.0 Cabinet Installation SSDS FY27 unit costs are: $ 35,339K for (1) LPD and (1) CVN MK 6 MOD X COTS Conversion Computing Infrastructure Kit $ 13,800K for (1) Shore Site H/W equipment $ 3,500K for (1) set of Shore Site internal components (GPNTS) $ 8,900K for SW tactical build, SW licenses, annual SW licenses and certification $ 7,183K for CAC2S Afloat 5 systems $ 446K for Cyber Security Total Cost for 1 ship System and 1 set of Shore Site internal components (GPNTS) units including SW & CAC2S Afloat in FY27 (UQ005B) is $69,168K SSDS Ship Installation Costs in FY27 (total $8,132K) include: $ 5,248K for AIT/DSA for installation/final checkout of (1) LHA (MK 6 MOD X) $ 600K for final checkout on 1 Ships (CVN) $ 400K for Year 2 Advanced planning/DSA* for 2 future hull (LHD LPD) $ 1,884K for Year 1 Advanced planning/DSA* for 3 future hull (1 CVN 2 LPD) SSDS Shore Installation Costs in FY27 (total $2,748K) include: $ 2,334K 1 Shore Site Planning $ 414K 1 Shore Site installation Note: In FY26/FY27 will include the procurement of Shore Site internal components (GPNTS). *Advanced Planning is done in each of the 2 years prior to an installation. Installation funds are required to be on contract and at field activities 90-150 days prior to installation start. Note: SSDS cost have increased primarily as a result of the transition to the new Computing Infrastructure configuration. Supply chain issues, implementation of required engineering changes to address hardware component obsolescence and diminishing manufacturing sourcing issues has also contributed to cost growth. Ship Installation Cost, which includes advanced planning, will vary per year depending on the quantities of ships, the mix of ship classes, the configuration of the specific hull (i.e., CVN, LHD, LHA, LPD, or LSD) and the geographical location of the CNO availability (e.g., Bremerton, Norfolk, San Diego). Installation funds are required to be on contract and at field activities 90-150 days prior to installation start. Installation cost is significantly higher than advanced planning. This can cause large variations between years. Recently, the installation cost has been increasing due to a) installations in non-traditional locations (e.g., Bremerton) driven by the Coast-wide bid process which causes extensive travel costs, b) Delays in delivery of Ship Installation Drawings, and c) scope changes during the modernization window. Further apparent cost increases are due to aligning modernization-related work such as Combat System documentation updates within the modernization budget. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 49 of 53 P-1 Line #105 Volume 4 - 59 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS MDAP/MAIS Code: [UQ5IN FMP SHIP UNITS] The cost for each kit is listed above. SSDS kit funding is provided to various contractors and field activities. The SSDS equipment procurement is based on competitive contracts. Production lead time for kits ranges from 12 months (for equipment COTS upgrade kits/field changes) up to 24 months for system COTS conversion kits for ships and shore sites. [UQ6IN NON-FMP SHORE SITES] The non-FMP kits are required for SSDS/CS shore sites: The SSDS MK 2 System/Software Combat System Engineering Agent; SCSC Wallops Island. Each of these facilities require equipment to support the in-service ship configurations, and to support the new configuration baselines in development. The SSDS OPN UQ005 supports field changes to the in-service baselines, and the establishment of new baseline configurations at the shore sites. The cost for the kits varies significantly depending on the site, its existing configuration, and mission of the site. [UQ5IN FMP SHIP UNITS] The cost for each kit is listed above. SSDS kit funding is provided to various contractors and field activities. The SSDS equipment procurement is based on competitive contracts. Production lead time for kits ranges from 12 months (for equipment COTS upgrade kits/field changes) up to 24 months for system COTS conversion kits for ships and shore sites. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 50 of 53 P-1 Line #105 Volume 4 - 60 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: UQ005B - SSDS COTS CONVERSION KITS B Kits Recurring 1.1.1) UQ5IN FMP SHIP UNITS - NonOrganic (32) 1.1.2) UQ6IN NON FMP SHORE SITES - NonOrganic Subtotal: Recurring Subtotal: UQ005B - SSDS COTS CONVERSION KITS Subtotal: Procurement, All Modification Items 22 / 211.999 1 / 33.690 22 / 144.500 - / 356.499 1 / 28.197 2 / 22.179 - 44 / 356.499 / 55.869 - 3 / 55.869 / 3.793 / 31.990 - 1 / 31.990 2 / 51.868 - / - 1 / 17.300 - / - / 69.168 - / - 3 / 69.168 - / - - / - - / 69.168 - / 69.251 - / 50.482 - / 56.305 - / 50.216 - / 0.000 - / 10.880 - / 16.618 - / 29.008 - / 21.737 - / 30.228 Continuing Continuing / - - / 10.880 - / 16.618 - / 29.008 - / 21.737 - / 30.228 Continuing Continuing 80.444 Continuing Continuing - / 356.499 - / 55.869 - / 31.990 - / 69.168 Modification Item 1 of 1: UQ005B - SSDS COTS CONVERSION KITS - / 191.049 - / 17.429 - / 32.255 - / 10.880 Subtotal: Installation - / 191.049 - / 17.429 - / 32.255 - / 10.880 2 / 51.868 2 / 54.646 1 / 17.300 - / 69.168 1 / 35.585 1 / 14.605 - 3 / 69.168 / 69.251 1 / 32.898 1 / 14.897 - 3 / 69.251 / 50.482 1 / 34.717 1 / 23.407 - 2 / 50.482 / 56.305 - 1 / 15.499 - 2 / 56.305 / 50.216 - / / 0.000 - 2 / 50.216 / - - / / 0.000 31 / 483.600 29 / 256.180 - / 739.780 60 / 739.780 - / 739.780 Installation - Total Total Cost (Procurement + Support + Installation) LI 5231 - Ship Missile Support Equipment Navy 547.548 73.298 64.245 80.048 0.000 UNCLASSIFIED Page 51 of 53 80.048 85.869 79.490 P-1 Line #105 78.042 Volume 4 - 61 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS MDAP/MAIS Code: Modification Item 1 of 1: UQ005B - SSDS COTS CONVERSION KITS Manufacturer Information Manufacturer Name: Various (Competitive Procurement) Manufacturer Location: Various (Competitive Procurement) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 15 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Apr 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: UQ5IN FMP SHIP UNITS - INSTALLATION Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 19 / 166.919 1 / 12.159 - Prior Years 2 / 24.186 0 / 5.248 0 / 0.000 0 / 5.248 - / - - / - 0 / 0.000 22 / 208.512 FY 2025 0 / 0.841 - / - 0 / 2.965 0 / 0.092 0 / 0.000 0 / 0.092 1 / 8.206 0 / 3.124 0 / 1.348 - / - 0 / 0.000 1 / 16.576 FY 2026 - / - 0 / 1.284 0 / 1.606 0 / 0.397 0 / 0.000 0 / 0.397 1 / 4.077 0 / 2.090 0 / 0.331 - / - 0 / 0.000 1 / 9.785 FY 2027 - / - - / - - / - 0 / 1.200 0 / 0.000 0 / 1.200 0 / 0.202 2 / 19.452 0 / 3.960 - / - 0 / 0.000 2 / 24.814 FY 2028 - / - - / - - / - 0 / 1.195 0 / 0.000 0 / 1.195 0 / 1.298 0 / 0.082 2 / 11.669 0 / 3.274 Continuing Continuing FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.412 0 / 0.199 1 / 18.354 Continuing Continuing FY 2030 - / - - / - - / - - / - - / - - / - - / - 0 / 0.910 0 / 0.830 1 / 4.645 Continuing Continuing FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.451 0 / 0.947 1 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - - - Total 19 / 167.760 1 / 13.443 2 / 28.757 0 / 8.132 0 / 0.000 0 / 8.132 / - - 2 / 13.783 / - 2 / 26.070 / - 2 / 18.788 / - 2 / 27.220 1 / 1.398 / - - Continuing / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 19 - - - 1 - 1 1 - - - - - - - - 2 - 1 1 - 1 1 - - - 1 - Out 16 - - 1 - - - - - 3 - 1 1 - LI 5231 - Ship Missile Support Equipment Navy - 1 - 1 1 - UNCLASSIFIED Page 52 of 53 - - - - - - P-1 Line #105 - 2 Q4 TC Tot 1 Cont. Cont. - Cont. Cont. Volume 4 - 62 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5231 / Ship Missile Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / UQ005B - SSDS COTS CONVERSION KITS MDAP/MAIS Code: Modification Item 1 of 1: UQ005B - SSDS COTS CONVERSION KITS Installation Information Method of Implementation: Method:: Installation Name: UQ6IN NON FMP SHORE SITES - INSTALLATION Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 21 / 23.289 - Prior Years 1 / 0.399 - / - - / - - / - - / - - / - 0 / 0.000 22 / 23.688 FY 2025 - / - 0 / 3.587 2 / 3.498 0 / 0.414 0 / 0.000 0 / 0.414 - / - - / - - / - - / - 0 / 0.000 2 / 7.499 FY 2026 - / - - / - - / - - - - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 2.334 0 / 0.000 0 / 2.334 1 / 0.423 - / - - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 2.412 1 / 0.431 - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 2.507 1 / 0.439 - / - 0 / 0.000 1 / 2.946 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.510 1 / 0.449 0 / 0.000 1 / 2.959 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.559 1 / 1.000 1 / 3.559 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total 21 / 23.289 1 / 3.986 / - - 2 / 3.498 / - - / - 0 / 2.748 / / - 0 / 0.000 / - 0 / 2.748 1 / 2.835 1 / 2.938 1 / 2.949 / - - Continuing / - 1 / 3.008 / - 1 / 2.757 Continuing / - - Continuing / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 21 - 1 - - - 2 - - - - - - - 1 - - - 1 - - - 1 - - - 1 - - Cont. Cont. Out 21 - - - - - - - - 1 - - - 2 - - 1 - - - 1 - - - 1 - - - Tot 1 Cont. Cont. Footnotes: (32) FY25 procurement of 1 ship set for LHD 8 availability schedule moved from FY27 to FY28. The ship set is still needed to meet ship install schedule. FY26 procurement of 1 ship set for LPD 28 will install in FY28. FY27 procurement of 2 ship sets for CVN 78 / LPD 20 will be installed in FY29. LI 5231 - Ship Missile Support Equipment Navy UNCLASSIFIED Page 53 of 53 P-1 Line #105 Volume 4 - 63 === page 140 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 64 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,247.938 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,247.938 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,247.938 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 98.921 98.921 98.921 107.709 107.709 107.709 116.208 116.208 116.208 0.000 0.000 0.000 116.208 116.208 116.208 127.057 127.057 127.057 114.659 114.659 114.659 124.034 124.034 124.034 To FY 2031 Complete 126.494 Continuing 126.494 126.494 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Theater Mission Planning Center (TMPC) and Tactical Tomahawk Weapons Control System (TTWCS) are components of the Tomahawk Weapons System (TWS) required to plan and execute Tomahawk strikes. The Theater Mission Planning Center (TMPC) consists of Commercial and Government Off-The-Shelf (COTS/GOTS) software and COTS hardware. TMPC is the mission planning segment of the Tomahawk Weapon System (TWS) that provides subsystems for the precision targeting, weaponeering, route planning, mission distribution, and strike management of Tomahawk cruise missile missions from sites located ashore and afloat. TMPC optimizes all aspects of the Tomahawk missile mission to successfully engage a target. TMPC is employed in major joint combat operations and Overseas Contingency Operations. TMPC has evolved into four scalable configurations deployed at 181 sites: Cruise Missile Support Activities (CMSAs) (3), Tomahawk Strike Mission Planning Cells (TSMPCs) (3), Carrier Strike Groups (CSGs) (21 Total: 11 CVNs and 10 Shore Sites), and Firing Units (FRUs) (135 Total: 85 Surface and 50 Subsurface). Additionally, TMPC is installed in Labs (6) and Training Classrooms (13) that contain various combinations of the four configurations. TMPC provides mission planning at the theater and operational levels and is designed for high-rate mission planning production responsive to national strategic, operational, and tactical requirements. TMPC produces and distributes missions; provides command information services; provides strike planning, execution, coordination, control and reporting, and provides Maritime Component Commanders (MCC) the capability to plan or modify conventional TWS missions. TMPC supports major joint combat operations and Overseas Contingency Operations. Funds provide for systems engineering, testing, Independent Verification & Validation (IV&V), security accreditation, installation, site acceptance testing, user familiarization of products, and hardware. Also, this funding line item provides for COTS refreshment, engineering changes, software upgrades, cyber-security modernization, and associated Nuclear Powered General Purpose Attack Submarine/Guided Missile Destroyer/Guided Missile Cruiser/Nuclear Aircraft Carrier (SSNs/DDGs/CGs/CVN) logistics and infrastructure to maintain compatibility and interoperability with existing and future TMPC and TTWCS system configurations. Tactical Tomahawk Weapon Control System (TTWCS) is a Software Acquisition Pathway Program, initiated in FY 2024 that supports 8 fielded software variants of the Tomahawk Weapons Control System. Continuous TTWCS software and hardware updates increase situational awareness, reduce operator workload and reduce complexity at the user interface and address software backlog correctives. The TTWCS v5.6X software series was released in FY 2021 and continues to be delivered adding additional capabilities across the Fleet FRUs (135 Total: 85 Surface and 50 Subsurface), labs, and training classrooms. The TTWCS v7.X software suite began development in 2024. Funds continue to support TTWCS viability and ensure compliance with cybersecurity mandates, and address hardware obsolescence through periodic LI 5253 - Tomahawk Support Equipment Navy UNCLASSIFIED Page 1 of 6 P-1 Line #106 Volume 4 - 65 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A COTS/GOTS hardware and software refreshes. Funds utilized to design the next generation hardware suites/configurations to meet evolving performance requirements, perform counterfeit analysis, and ensure Tomahawk system of system alignment. In FY 2027, TTWCS Software Modernization activities will continue the re-architecture of all TTWCS components to address software configurability, software language, and Human Computer Interface updates to bring added improvements to the TTWCS suite of software products. Specifically, the increase will execute the modernization and consolidation of legacy software code to contemporary software languages (including the elimination of Ada), from software development techniques including containerization, middleware, microservices, and modularity upgrades to increase flexibility across platforms and users. Enhancements to the automation of test scripts and DevSecOps, will continue through FY 2031. The modernization efforts are required to ensure an enhanced security architecture design provides a flexible and modern software system to meet Fleet needs cybersecurity and ease of focused modernization activities. LI 5253 - Tomahawk Support Equipment Navy UNCLASSIFIED Page 2 of 6 P-1 Line #106 Volume 4 - 66 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / 525300, TOMAHAWK Support Equipment - / 1,247.938 - / 98.921 - / 107.709 - / 116.208 - / 0.000 - / 116.208 P-40 Total Gross/Weapon System Cost - / 1,247.938 - / 98.921 - / 107.709 - / 116.208 - / 0.000 - / 116.208 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This line funds TMPC and TTWCS system modernization upgrades. FY 2027 Tomahawk Weapons System funds provide for integration, modernization and interoperability efforts necessary to keep pace with changes and threats, retain capability and exploit capabilities of internal products (TWS All-Up-Round missile and TTWCS) and external products (Modernized Integrated Data Base (MIDB), National Geospatial Intelligence Agency (NGA) products, Distributed Common Ground Systems (DCGS) Integrated Backbone (DIB) compliance, Future Imagery Architecture (FIA) imagery formats and Intelligence Surveillance & Reconnaissance (ISR) interfaces, Network Centric Enterprise Services (NCES), and Global Information Grid. These efforts ensure the continued effectiveness and relevance of the Tomahawk Weapons System. TMPC: FY 2027 funding is required to continue the upgrade of unsupportable and obsolete TMPC hardware and software, ensure compliance with DoW cyber-security mandates, and continue fielding TMPC 7.X. FY 2027 also funds upgrades necessary to improve cybersecurity posture across all TMPC sites to a minimum required level of robustness, resiliency, and cyber survivability in light of the constantly evolving technology and threat space to preserve national first-strike Tomahawk system of systems capability. These upgrades are required for development of TMPC 8.X, fielding TMPC 7.X, and support the employment and capability of the Joint Multiple Effects Munitions (JMEWS) and Maritime Strike Tomahawk (MST) programs. These upgrades enable fielding of advanced capabilities of the Tomahawk Modernization program with required program protection safeguards to protect Critical Program Information. The increase in funding in FY 2027 is for the modernization and integration of TMPC X. This new version of TMPC will be an upgraded and modernized version of the three major components of TMPC: TPS, TNT, and MDS. This effort will include modern software development and architecture implementation, increased system performance, integrated cyber protections, reduced mission planning times as well as other system improvements. TMPC X will also provide the warfighter with a modern software suite that will support the current TWS mission and will allow for a more rapid delivery of future TWS requirements. The system will include networking equipment to integrate with the naval data exchange for unified strike planning and execution system to provide all source multi-intelligence data at multiple levels of security to strike mission planners. TMPC will incorporate cross domain solution capabilities to include data exchange with the Next Generation Mission Planning System. TTWCS: FY 2027 funding is required to continue modernization to software configurability, software language, and Human Computer Interface activities which will provide added improvements to the TTWCS suite of software products. These improvements ensure an enhanced security design, provide a flexible and modern software system to meet Fleet cybersecurity needs, and support focused modernization activities going forward. FY 2027 funding is required to continue addressing specific security and supportability builds for current software builds, procurement, and assembly activities associated with contemporary hardware integration efforts to support Tomahawk missile capabilities. FY 2027 funding supports the continued fielding of updated hardware and software releases to Firing Units, and integrated logistics support. Other FY 2027 activities include HW procurement, installation planning, modernization activities, long-term planning of future software versions, and technical data packages. Product improvement resources are required to comply with commercial hardware and software supportability mandates, obsolescence, and information assurance requirements to maintain pace with modern computing architectures and evolving cyber threats. TTWCS relies on COTS hardware and software tools that require a stable and established upgrade path to meet cyber security mandates, address supply chain risk management, ensure continued vendor supportability, quality assurance, and ensure interoperability between COTS software applications, operating systems, and hardware processing nodes. LI 5253 - Tomahawk Support Equipment Navy UNCLASSIFIED Page 3 of 6 P-1 Line #106 Volume 4 - 67 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 525300, TOMAHAWK Support Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 1,247.938 Less PY Advance Procurement ($ in Millions) 98.921 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 116.208 - 0.000 - 107.709 116.208 - 116.208 - 98.921 FY 2027 Total 0.000 - 107.709 - 1,247.938 - - 98.921 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 107.709 - 1,247.938 FY 2027 Base - 116.208 - 116.208 - 0.000 116.208 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - TTWCS Cost Recurring Cost 1.1.1) Tactical Tomahawk Weapon Control System (TTWCS) Hardware - - 46.694 - - 4.904 - - 4.993 - - 4.998 - - - - - 4.998 - - 46.694 - - 4.904 - - 4.993 - - 4.998 - - - - - 4.998 - - 46.694 - - 4.904 - - 4.993 - - 4.998 - - - - - 4.998 (1) Subtotal: Recurring Cost Subtotal: Hardware TTWCS Cost Hardware - HARDWARE RECURRING SUPPORT - TTWCS Cost Recurring Cost 2.1.1) TTWCS Product - - 271.109 - - 17.095 - - 23.844 - - 22.836 - - - - - 22.836 Subtotal: Recurring Cost - - 271.109 - - 17.095 - - 23.844 - - 22.836 - - - - - 22.836 Subtotal: Hardware HARDWARE RECURRING SUPPORT - TTWCS Cost - - 271.109 - - 17.095 - - 23.844 - - 22.836 - - - - - 22.836 - - 45.015 - - 3.682 - - 3.486 - - 3.511 - - - - - 3.511 - - 45.015 - - 3.682 - - 3.486 - - 3.511 - - - - - 3.511 Improvement (2) Hardware - TMPC Cost Recurring Cost 3.1.1) Tomahawk Mission Planning Center (TMPC) Hardware (3) Subtotal: Recurring Cost LI 5253 - Tomahawk Support Equipment Navy UNCLASSIFIED Page 4 of 6 P-1 Line #106 Volume 4 - 68 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 525300, TOMAHAWK Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Hardware - TMPC Cost - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 45.015 - - 3.682 - - 3.486 - - 3.511 - - - - - 3.511 Software - PRODUCT IMPROVEMENTS - TMPC Cost Recurring Cost 4.1.1) TMPC Product - - 310.862 - - 31.913 - - 35.728 - - 45.093 - - - - - 45.093 Subtotal: Recurring Cost - - 310.862 - - 31.913 - - 35.728 - - 45.093 - - - - - 45.093 Subtotal: Software - PRODUCT IMPROVEMENTS - TMPC Cost - - 310.862 - - 31.913 - - 35.728 - - 45.093 - - - - - 45.093 - - 32.490 - - 1.868 - - 1.880 - - 1.921 - - - - - 1.921 - - 189.145 - - 12.534 - - 12.685 - - 12.308 - - - - - 12.308 - - 221.635 - - 14.402 - - 14.565 - - 14.229 - - - - - 14.229 - - 71.599 - - 5.324 - - 4.927 - - 4.987 - - - - - 4.987 - - 67.071 - - 5.044 - - 4.783 - - 4.803 - - - - - 4.803 - - 189.925 - - 16.557 - - 15.383 - - 15.751 - - - - - 15.751 - - 328.595 - - 26.925 - - 25.093 - - 25.541 - - - - - 25.541 - - 15.139 - - - - - - - - - - - - - - - - - 15.139 - - - - - - - - - - - - - - - Improvements (4) Support - Support - TTWCS Cost 5.1) TTWCS Production Engineering (5) 5.2) TTWCS Integrated Logistic Support (6) Subtotal: Support - Support - TTWCS Cost Support - TMPC Cost 6.1) TMPC Production Engineering (7) 6.2) TMPC Production Support (8) 6.3) TMPC Integrated Logistic Support (9) Subtotal: Support - TMPC Cost Support - ILS INSTALLATIONS Cost 7.1) FMP Installations Subtotal: Support - ILS INSTALLATIONS Cost Support - Miscellaneous Cost - - 8.889 - - - - - - - - - - - - - - - Subtotal: Support Miscellaneous Cost 8.1) TTWCS Other Cost - - 8.889 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 1,247.938 - - 98.921 - - - - - - 0.000 - - LI 5253 - Tomahawk Support Equipment Navy 107.709 UNCLASSIFIED Page 5 of 6 116.208 P-1 Line #106 116.208 Volume 4 - 69 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 3 P-1 Line Item Number / Title: 5253 / Tomahawk Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 525300, TOMAHAWK Support Equipment MDAP/MAIS Code: Footnotes: (1) TTWCS Hardware: FY 2027 funds are required to address hardware obsolescence through periodic COTS hardware refresh and continuously assess supply chain risk and alternative hardware sourcing. Continued funding is required to support planned procurement of TTWCS components for retrofit onto Fleet surface platforms for periodic updates. (2) TTWCS Product Improvement: FY 2027 funding supports continuing modernization and consolidation of legacy software code to contemporary software languages, software development techniques including containerization and modularity upgrades to increase flexibility across platforms and users. TTWCS relies on COTS hardware, operating systems, and software that require a stable and established upgrade path to meet cyber security mandates, ensure continued vendor supportability, conduct supply chain risk management assessments, and ensure interoperability between COTS applications and hardware. (3) TMPC Hardware: FY 2027 funding is provided for the continuation of the procurement of hardware for TMPC 8.X modernization upgrades and installations at Cruise Missile Support Activities (CMSALANT and CMSAPAC), TSMPCs (C5F, C6F, and C7F), CSGs, CVNs, and Firing Units. TMPC 7.X is mission critical to support upgraded navigation, communications capabilities, and systems essential to the continued effectiveness and interoperability of the TWS. TMPC 8.X is mission critical to support MST IOC, TWS Dynamic Inventory, and JMEWS implementation. (4) TMPC Product Improvement: The increase from FY 2026 to FY 2027 within TMPC Product Improvements totaling $9.4M is for the next phase, which is the implementation of the TPS user interface redesign, TNT architectural migration from legacy architecture to service oriented architecture, completion of MDS microservice conversion, and a complete redesign of the TMPC Enterprise Database (TED). These activities were specifically not funded in FY 2026 or a part of any previous hardware or software build. FY 2027 funding is not cost growth, this increase is to support TMPC Modernization and Transformation (TMPC X). TMPC will incorporate cross domain solution capabilities to include data exchange with the Next Generation Mission Planning System. TMPC X will include modern software development and architecture implementation, increased system performance, integrated cyber protections, reduced mission planning times as well as other system improvements. TMPC X will also provide the warfighter with a modern software suite that will support the current TWS mission and will allow for a more rapid delivery of future TWS requirements. This continues the upgrade of unsupportable and obsolete TMPC hardware and software to ensure compliance with DoW cyber security mandates. Funding supports modernization upgrades necessary to improve cybersecurity posture across all TMPC sites to a minimum required level of robustness, resiliency, and cyber survivability in light of evolving cyber threats. These modifications are required to support the upgrade of TMPC 8.X, the continuation of fielding for TMPC 7.X, and to support the deployment of JMEWS, MST, and program protection safeguards that protect Critical Program Information. Funding provides for implementation of the infrastructure changes for TMPC 7.X and TMPC 8.X to support the MST Missile in its operational environment. Funding provides software system upgrades for the submarine community to address system interfaces and upgrades to support the TMPC system usability improvements required for fleet operators to execute large and complex TLAM operations as required by US Fleet Forces Command (USFFC) and link existing targeting sources to the MST Missile. (5) TTWCS Production Engineering Support: FY 2027 funding is required for kit production in support of Surface installations onboard firing units. The increased funding levels in FY 2027 are a product of inflation and support the required documentation for hardware qualification, reports of testing/integration of ship sets, hardware build-up and tech data packages, and advance planning efforts. Engineering support is required for supply chain risk management, quality assurance testing of component lots, interoperability between tightly coupled COTS applications and hardware processors, and continued vendor supportability scans. (6) TTWCS Integrated Logistics Support: FY 2027 funding is required for installations onboard surface and submarine firing units. Variations in ship availability schedules are the cause of funding changes from year to year. (7) TMPC Production Engineering: Provides systems engineering support for system design and definition of requirements necessary to evaluate all functional aspects of the TMPC subsystems and workflows that directly impact strike & execution and mission planning products. It includes reviewing TWS and external interfaces for impacts resulting from design upgrades/changes within TWS and by external organizations, Independent Verification & Validation (IV&V), and security accreditation activities. (8) TMPC Production Support: Funds activities that directly support system upgrades requirements such as user events, requirements validation, systems engineering technical reviews, software formal qualification testing, and delta training documentation. (9) TMPC Integrated Logistics Support: FY 2027 funds provide for employment and capability of the MST an ACAT-1 subprogram, and continues the fielding of advanced capabilities of Tomahawk Modernization program with required program protection safeguards to protect Critical Program Information. This line continues TMPC 6.0 FRU Guided Missile Destroyer, Guided Missile Cruiser, and Nuclear Attack Submarine DDGs/CGs/SSNs. TMPC 7.X supports key mission planning timeline improvements, cybersecurity hardening, and system recovery to ensure the continued effectiveness and interoperability of the TWS in the face of a sophisticated cyberattack. FY 2027 also provides funding to continue TMPC 7.X installations and begin 8.X installations at the CMSAs & TSMPCs (3 - C5F, C6F, and C7F), CSG suites both afloat on CVNs and key control nodes ashore as well as training and labs. LI 5253 - Tomahawk Support Equipment Navy UNCLASSIFIED Page 6 of 6 P-1 Line #106 Volume 4 - 70 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5353 / CPS Support Equipment Program Elements for Code B Items: 0605518N, 0204284N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 67.264 - - - 0.000 0.000 67.264 - - - 0.000 0.000 67.264 188.430 188.430 188.430 0.000 0.000 0.000 188.430 188.430 188.430 516.404 516.404 516.404 518.483 518.483 518.483 572.104 572.104 572.104 To FY 2031 Complete 545.925 545.925 545.925 Total - 2,408.610 - 2,408.610 - 2,408.610 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Conventional Prompt Strike (CPS) capability will enable precise and timely strike in contested environments across multiple platforms. In coordination with the Army, the Navy CPS Program is designing a common All Up Round (AUR) comprised of a Common Hypersonic Glide Body (C-HGB) and a 34.5" two-stage booster. The Navy is responsible for C-HGB design and assumed responsibility for C-HGB production from the Army in FY 2026. The Navy will design, develop, and produce the missile booster, and will integrate the missile booster with the C-HGB. Each service will use the resulting common hypersonic missile while developing individual weapon control systems and launchers tailored for launch from sea or land. The Navy is planning to integrate the Conventional Prompt Strike (CPS) weapons system onto the VIRGINIA Class (VACL) Submarines (two Virginia Payload Module (VPM) tubes per SSN). A Navy APM interfaces with large diameter tubes and provides storage and launch capability for the AUR+Cs. CPS integration is a top CNO priority that enhances the Navy's lethality by providing a critical hypersonic attack capability to prevail in Great Power competition. CPS and SSN will continue driving toward a fully integrated capability on SSN to ensure Operational Commanders have the flexibility of using any, or all, of the VPM tubes to accommodate CPS. Per the current plan of record, CPS will provide two Advanced Payload Modules (APMs) and six AUR+Cs to each fielded hull, allowing flexibility to install other payloads in the remaining two VPMs. Advanced Payload Modules (APM) are interchangeable end items and are budgeted in OPN, while the AUR+Cs are budgeted in WPN. LI 5353 - CPS Support Equipment Navy UNCLASSIFIED Page 1 of 8 P-1 Line #107 Volume 4 - 71 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5353 / CPS Support Equipment Program Elements for Code B Items: 0605518N, 0204284N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a CPS Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / - - / 67.264 - / 188.430 / 0.000 - / 67.264 - / 188.430 - / - - / 188.430 / 0.000 - / 188.430 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds support the procurement of Navy Advanced Payload Modules (APMs) for use on VIRGINA Class Submarines. The production lead time is 30 months. Delivery schedule for APMs will be in 3month intervals based on ability to achieve desired industrial capacity. The installation period required for APMs can occur during windows of opportunity for the designated hull. The quantity is required to address gaps in the current loadout plans. LI 5353 - CPS Support Equipment Navy UNCLASSIFIED Page 2 of 8 P-1 Line #107 Volume 4 - 72 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5353 / CPS Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: CPS Support Equipment FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) CPS SSN Support Equipment 1.1) CPS SSN Advanced Payload A - - - - - - Subtotal: 1) CPS SSN Support Equipment - - 0.000 - - - - - 67.264 - Total - - 0.000 - - - - - 67.264 - Module (APM) (1)(†) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 33,632K 2 67.264 31,405K 6 188.430 - - - 31,405K 6 188.430 - 188.430 - - - - - 188.430 - 188.430 - - - - - 188.430 indicates the presence of a P-5a Footnotes: (1) Funds provided for the procurement of Navy Advanced Payload Modules (APMs) for use on VACL Submarines. The APM interfaces with large diameter tubes that provide storage and launch capabilities for the AUR+Cs. The increased quantity is required to address gaps in the current loadout plans. LI 5353 - CPS Support Equipment Navy UNCLASSIFIED Page 3 of 8 P-1 Line #107 Volume 4 - 73 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5353 / CPS Support Equipment Aggregated Items: CPS Support Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2026 Lockheed Martin / Denver, CO C / CPIF Denver, CO Apr 2026 Oct 2028 2 33,632K N Sep 2028 Jul 2024 2027 Lockheed Martin / Denver, CO C / FPIF Denver, CO Apr 2027 Oct 2029 6 31,405K N Sep 2028 Jul 2024 Qty (Each) RFP Issue Date 1) CPS SSN Support Equipment 1.1) CPS SSN Advanced Payload Module (APM) (1)(†) 1.1) CPS SSN Advanced Payload Module (APM) (†) (1)(†) indicates the presence of a P-21 LI 5353 - CPS Support Equipment Navy UNCLASSIFIED Page 4 of 8 P-1 Line #107 Volume 4 - 74 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5353 / CPS Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CPS Support Equipment Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) CPS SSN Support Equipment 1.1) CPS SSN Advanced Payload Module (APM) (1) 6 2026 NAVY 2 0 2 6 2027 NAVY 6 0 6 A O C T LI 5353 - CPS Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #107 M A R - - - - - - 2 A - - - - - - 6 A P R M A Y J U N J U L A U G S E P Volume 4 - 75 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5353 / CPS Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CPS Support Equipment Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) CPS SSN Support Equipment 1.1) CPS SSN Advanced Payload Module (APM) (1) 6 2026 NAVY 2 0 2 - - - - - - - - - - - - 6 2027 NAVY 6 0 6 - - - - - - - - - - - - O C T LI 5353 - CPS Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P 1 O C T N O V - - - D E C 1 0 J A N F E B P-1 Line #107 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 76 6 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5353 / CPS Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CPS Support Equipment Fiscal Year 2030 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) CPS SSN Support Equipment 1.1) CPS SSN Advanced Payload Module (APM) (1) 6 2026 NAVY 2 2 0 6 2027 NAVY 6 0 6 0 1 O C T LI 5353 - CPS Support Equipment Navy N O V D E C 2 J A N F E B M A R 1 A P R M A Y J U N 2 J U L 0 A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #107 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 77 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5353 / CPS Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Aggregated Items: CPS Support Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 2 5 7 1 Lockheed Martin - Denver, CO ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 30 Total After Oct 1 ALT Prior to Oct 1 30 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 30 30 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5353 - CPS Support Equipment Navy UNCLASSIFIED Page 8 of 8 P-1 Line #107 Volume 4 - 78 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,825.606 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,825.606 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,825.606 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 320.691 320.691 320.691 491.179 491.179 491.179 327.941 - 0.000 - 327.941 - 0.000 - 327.941 0.000 327.941 327.941 327.941 496.876 496.876 496.876 474.776 474.776 474.776 518.210 518.210 518.210 To FY 2031 Complete 448.290 Continuing 448.290 448.290 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This budget supports the shipboard subsystem equipment modernization and technical refresh efforts associated with TRIDENT II D5 Life Extension (D5LE) program as well as procurement of Strategic Weapons System (SWS) equipment for deployed ballistic missile submarines (SSBNs) and shore support sites. OTHER MATERIAL SUPPORT A broad range of other material support equipment must be procured for deployed SSBNs, shore installations and contractor facilities. Included within this category are general and special purpose test equipment, launcher expendables, navigation principal items, test instrumentation in support of missile flight tests, and missile checkout equipment. This includes capital maintenance support for the Naval Industrial Reserve Ordnance Plant (NIROP) which provides for significant rehabilitation and repair work for major facility, infrastructure, and systems at the Navy owned Pittsfield, MA facilities supporting the SWS. The NIROP infrastructure and systems are housed primarily in three main buildings and include but are not limited to power, steam, and cooling systems & infrastructure, life-safety and security systems, and other critical infrastructure such as roofs, elevators, restrooms, and parking lots. Work is performed on each major system on a rolling maintenance program that is based on service life. Continued maintenance of these critical facility systems is essential for support of the on-going Fleet Ballistic Missile (FBM) programs at the Pittsfield, MA NIROP. Hardware/Software IT Procurement funding in all years provides for non-tactical IT equipment acquisitions (hardware and related software) in support of the SSP enterprise and all associated programs. This includes the IT hardware and software components connected to the Strategic Weapons System Network (SWSNET). ALTERATIONS Alterations to non-flying tactical hardware support continuing requirements for the SWS. Requirements primarily relate to shipboard investments in Commercial-off-the-Shelf/Non-Developmental Items (COTS/ NDI) SWS subsystem equipment, including periodic refresh cycles, to ensure continued reliable performance of the weapon system for its extended service life to match the OHIO Class life extension. Strategic Programs Alterations (SPALTs) also entail the application of available technology to eliminate personnel safety hazards, correct design deficiencies, maintain system effectiveness by resolving equipment operability problems, achieve logistic economies, and provide for shipboard subsystem D5LE modernization efforts. Recent hardware alteration efforts include funds to (1) procure alterations to the SWS launcher and fire control subsystems; (2) test instrumentation used on SSBNs, support ships, and at the Eastern Test Range, the TRIDENT Refit Facility (TRF) - Bangor, and TRF - Kings Bay; and (4)procure missile handling equipment, missile test and readiness equipment, and surface support equipment. Installation of approved SPALTs are performed on a turnkey basis in conjunction with the procurement of equipment. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 1 of 20 P-1 Line #108 Volume 4 - 79 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A Alterations funding supports the Shipboard System Integration (SSI) program and is utilizing a COTS based strategy that integrates common electronics from Fire Control (FC), Launcher, and Navigation (NAV) into the fire control sub-system. This includes refreshing inertial systems to ensure the TRIDENT II (D5LE) weapon system can be sustained through the life of the OHIO Class SSBNs and serve as the baseline for the COLUMBIA Class SSBNs. Below is a description of each current SSI Increment (Inc): SSI Inc 8: This ongoing effort provides replacement of the 30 year old Electrostatic Gyro Navigator (ESGN) which needs a refresh of inertial technology components, provides replacement of the Electronic Equipment Consoles (EEC), and updates Navigation Subsystem software to accommodate ESGN replacement navigator. Also, provides SWS subsystem SPALTs for FC and Trident Training Facility (TTF) NAV Lab trainers, and Shipboard Data System (SDS)/Data Recording System (DRS) SPALT changes which are driven by data requirement changes. The ship alterations (SHIPALTs) retain NAV Center bedplate, cabling, chilled water/ventilation, and electrical power. SSI Inc 11: Completed in FY 2025, Inc 11 developed the Launcher Initiation System (LIS) for backfit onto OHIO Class D5LE. This provided a technical refresh of 30+ year old technology to ensure long term system reliability. Ship/Strategic Weapon Support Systems (SWSS) SHIPALT also replaced electrical cable with hybrid fiber-optic/electrical cable. SSI Inc 13: Completed in FY 2025, Inc 13 provided Shipboard Systems Refresh for Fire Control System (FCS), Navigation (NAV), and Missile Test and Readiness Equipment (MTRE) to integrate with the subsystems. SSI Inc 15: As the prerequisite is SSI Inc 13, Inc 15 provides refresh alterations for the fire control subsystem. SHIPBOARD SYSTEMS MODERNIZATION PORTFOLIO (SSMP) Program SSP is undertaking a strategic modernization of the shipboard systems architecture to harness new technologies and leverage modern engineering methodologies. This will ensure credible, reliable and adaptable capabilities are provided to the warfighter and nation at the speed of relevance. SSMP is the overarching program management framework for the integration of all current and future acquisition activity related to SWS shipboard systems. It includes design work to achieve an optimized shipboard architecture across SWS subsystems as well as the integration of all other shipboard systems development and sustainment activities. SSMP has been defined in four major programmatic elements: A. Advance Development and Tech. Maturation B. Shipboard Re-Architecture Design C. Obsolescence Management D. Continuous Capability Insertion (C2IS) A. Advance Development and Tech. Maturation consists of multiple incremental alterations to the shipboard systems of the SWS that primarily addresses obsolescence and sustainment. The SSI Increments program employed a strategy of targeted technology refreshes and functional consolidations in conjunction with life of type buys to manage obsolescence within the shipboard systems. While the increments were successful in achieving limited modernization of portions of the system design they did not principally address a holistic modernization of the underlying architecture of the collection of shipboard systems (Fire Control, Navigation, Shipboard Data System, and Launcher) that was established with TRIDENT II D5 in the 1980s. The SSI Increments program began with SSI Increment 1 which started in the early 2000s and will conclude with the deployment of Increment 15 in the late 2020s. B. Shipboard Re-Architecture builds on the Increment 15 system baseline and is designed to achieve an architectural re-design of the shipboard systems. Leveraging modern technologies and approaches, this effort will eliminate the architectural constraints that hinder adaptability in the current SWS. Whereas the SSI Increment program focused on minimizing lifecycle costs around a stable system capability and performance baseline, Shipboard Re-Architecture focuses on maximizing scalability and adaptability in the architecture to enable rapid response to a dynamically changing threat environment while minimizing lifecycle costs. This shift in approach is needed to counter the rapidly changing threat environment that results from two near-peer nuclear adversaries and resultant dynamic needs for SLBM capability. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 2 of 20 P-1 Line #108 Volume 4 - 80 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A Shipboard Re-Architecture is structured around three lines of modernization which will establish a shipboard common infrastructure. Once the shipboard common infrastructure is in place, legacy software can be refactored to make use of standard functions and features and new capabilities can be more easily and rapidly introduced. The three lines of modernization are: 1. Implementation of a modern General Purpose Computing (GPC) infrastructure. This is critical to provide a scalable computational element that leverages modern technologies to achieve critical improvements in computational capability and cyber resiliency. 2. Implementation of a modern Deterministic Computing Element (DCE) infrastructure. This is critical to provide a modernized real-time embedded computing infrastructure based on the latest technologies and industry standards for high availability, high criticality systems. 3. Implementation of a modern data architecture and shipboard-flight interface infrastructure. This is critical to modernize communication protocols, software design, data structures, and interfaces to improve cyber security, supportability, and maintainability of the system. It is also an essential enabler to support emerging technologies under development for the flight and re-entry systems (e.g. TRIDENT II D5 Life Extension 2 (D5LE2) and Mk7/W93). Shipboard Re-Architecture will be executed using an agile methodology and digital engineering methods. Smaller alterations to the existing shipboard systems will be executed over time rather than establishing several large incremental procurements. This approach is important for two reasons. First it will allow SSP to respond rapidly to changing National priorities while still making strategic investments in the rearchitecture. Second, by overlapping and sequencing the roll off from SSI Increments 8 and 15 with the ramp up of Shipboard Re-Architecture effort, SSP is able to leverage the established industrial base which is a significant factor in managing risk, ensuring expertise and unique knowledge pertaining to the SWS design is retained and applied to the re-architecture efforts. Shipboard Re-Architecture is strategically phased to also support the critical D5LE2 experimental test flight program in the early 2030s and planned refreshes for the COLUMBIA class. C. Obsolescence Management: This aspect addresses the need to continuously sustain the shipboard systems. This includes planning for technology refreshes and obsolescence management during all phases of SSMP, leveraging the modernized architecture established by the Shipboard Re-Architecture efforts. Specifically, the decoupling of hardware and software and introduction of virtualization technologies in the re-architecture will serve to enable rapid insertion of technology refreshes and simplify obsolescence management of the shipboard systems. The objective is for the program to be capable of hardware insertion every two years and annualized software releases. D. The C2IS element of the SSMP defines the approach to both sustaining the shipboard elements of the SWS and ensuring adaptability and timely insertion of capabilities to meet the dynamic threat environment and needs of the Nation. C2IS is fully integrated with re-architecture efforts to enable an appropriate balance of acquisition decisions between re-architecture, obsolescence management, and capability insertions. As the Shipboard Re-Architecture initiative is incrementally realized, the new architecture will enable a faster cadence that is more adaptable and affordable to changes. This will allow SSP to rapidly address both obsolescence and capability insertion, including improvements in SWS performance and the integration of support for advanced missile/re-entry technologies. The overall SSMP program addresses the need to provide capability to the Warfighter. Before, during, and after the re-architecture efforts are complete Shipboard Subsystems must be able to adapt and introduce capability to keep pace with the changing threat environments. SSMP will focus on refreshing the shipboard architecture, which will allow adaptability for the quick and effective deployment of affordable solution along with the incremental deployment of capabilities required to sustain SWS effectiveness in a changing threat environment. This will maximize the ability of the SWS to adapt to changing threats. This involves enhancing the product and optimizing the SWS to satisfy STARTCOM specifications. This entails updating outdated shipboard systems components with new technology to guarantee the deployed SWS's availability and dependability while preserving compatibility with the pull-through components that are a requirement of the COLUMBIA design. To achieve this goal, a balance will need to be maintained between shipboard architectural changes and capability insertion. Once the Shipboard Common Infrastructure is in place the ability to rapidly insert capability will be improved and is essential for the SWS to adapt and respond to the ever-changing threats of the future. TRAINING LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 3 of 20 P-1 Line #108 Volume 4 - 81 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A This category provides for procurement of, and alterations to, both tactical and non-tactical equipment required at submarine training facilities to train personnel in the operation and maintenance of launcher and handling, fire control, navigation, missile checkout, and test instrumentation subsystems. Each training facility consists of an integrated family of system and unit laboratories that interface with a training simulation system to provide complete and realistic training for replacement and off-crew personnel, both officer and enlisted, as required for manning of SSBNs and shore facilities. Funding is budgeted to procure training-unique equipment required as the result of alterations to SWS tactical equipment, including those associated with D5LE. COLUMBIA CLASS Funding in this category is in support of the COLUMBIA Class SSBN for the procurement of trainer equipment and execution of Trident Planned Equipment Replacement Program (TRIPER) efforts. Funding is required to develop, procure, install and test the Strategic Weapon Support System (SWSS) trainer equipment suite within the COLUMBIA Class Kings Bay (KB) TTF 2-tube configuration. The SWSS trainer equipment suite simulates the tactical configuration required to conduct COLUMBIA crew training and certification beginning in January 2026. Procurement of select SWSS components, such as training missile tubes and associated on and off-tube components, as well as engineering labor required to integrate the COLUMBIA design into the trainer configuration, commenced in FY 2022 to ensure initial equipment is installed before exterior building construction is complete (FY 2024) and all remaining hardware will be delivered in FY 2024 and the first half of FY 2025 for installation, checkout and testing. Similar procurements for the COLUMBIA Class Bangor TTF commence in FY 2028. The 2024 program cost estimate reflects updates based on awarded U.S. contracted values, updated labor rates, and increased material costs driven by inflation. . Starting in FY 2027, Naval Foundry Propeller Center (NFPC) funding was realigned from Fleet funding to NAVSEA HQ as a General Fund Field Activity. OPN funding for NFPC's ongoing critical equipment replacements is partially captured under LI 5358. NFPC's primary mission is to manufacture advanced propulsors for the Navy's submarine fleet, providing Government Furnished Equipment (GFE) to new acquisition submarine programs. NFPC is critical to achieving the submarine production cadence for the CLB and VCS programs. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 4 of 20 P-1 Line #108 Volume 4 - 82 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Strategic Missile Systems Equip P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,825.606 - / 320.691 - / 491.179 - / 327.941 - / 1,825.606 - / 320.691 - / 491.179 - / 327.941 - / - - / 327.941 / 0.000 - / 327.941 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2026 funding for Strategic Missile Systems Equip includes $491,179 thousand of discretionary and $9,180 thousand of mandatory funding for a total of $500,359 thousand. The mandatory funds include procurement of both hardware and related software of non-tactical IT equipment and supports the acceleration of the development, procurement, and integration of the Nuclear-Armed Sea-Launched Cruise Missile program (SLCM-N). Further information for this reconciliation request is provided in Section 20008 (Nuclear) of the One Big Beautiful Bill Act spend plan. OTHER MATERIAL SUPPORT A broad range of other material support equipment must be procured for deployed SSBNs, shore installations and contractor facilities. Included within this category are general and special purpose test equipment, launcher expendables, navigation principal items, test instrumentation in support of missile flight tests, and missile checkout equipment. Amounts included within this category are subdivided as follows: Launcher and Handling Equipment: Cost Codes 1.1 and 1.2 provide for Gas Generator (GG) Production and GG Case Hardware. GGs are utilized to eject Trident II (D5) missiles from the missile tubes during a launch. Cost Code 1.1 FY 2027 Funding increase due to the procurement of 23 Gas Generators to support Sea leg capacity expansion, an increase from 0 in FY 2026. The production unit cost for these generators has been adjusted upward to account for inflationary impacts and realized increases in material and production costs from the industrial base. Cost Code 1.2 funding provides the procurement and qualification of GG Case Hardware required to replace cases for expended/fired GGs. Funding in this category fluctuates year to year due to flight schedules. FY 2027 decreases due to the quantity of gas generator hardware decreasing to 10, PreLoading Indicating (PLI) Washer decreasing to 0. Cost Code 1.3 FY 2027 decrease due to the procurement of 3 Ballast Transport Fixtures (BTFs) from 6 in FY 2026. Fire Control Equipment: Cost Code 2.1 funding provides for procurement of continued capital maintenance projects at the Naval Industrial Reserve Ordnance Plant (NIROP) in Pittsfield, MA. The Navy NIROP facility in Massachusetts is a large multi dwelling facility, encompassing almost 900,000 sq. ft. There are three main ordnance plant (OP) buildings on the NIROP facility, OPs 1, 2, and 3. The OPs were built in the 1940s and 1950s, and the last major renovations were in the 1970s. Funding fluctuates annually based on specific maintenance projects necessary to correct environmental, safety, and energy conservation deficiencies. FY 2027 scope includes OP1 Air Handler Refresh and OP3 Load Center Replacement. Electrical Load Centers at the Pittsfield NIROP are large, integrated critical systems that combine a transformer, switchgear, and a breaker box into a single housing. Cost Code 2.2 FY 2027 increase is due to a full redesign of the Missile Simulator Interface (MSI) and the Missile Interface Test Module (MITM) Module for Training Stimulation System (TSS) and the Weapon System Simulator (WSS). MSI and MITM support the fleet training TSS and troubleshooting and validation of tactical systems WSS. Without these modules the fleet cannot be supported for missile interface testing and validation. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 5 of 20 P-1 Line #108 Volume 4 - 83 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A Cost Code 4.3 FY 2027 decrease due to the completion of the refresh of the Portable Antenna Telemetry System (PATS). There are no refreshes in FY 2027. Information Technology (IT): Cost Code 5.1 funding in all years provides for non-tactical IT equipment acquisitions (hardware and related software) in support of the SSP enterprise. This includes the IT hardware and software components connected to the Strategic Weapons System Network (SWSNET). Increase in FY 2027 to support the expanding workforce required for new nuclear modernization programs including D5LE2. ALTERATIONS Alterations to non-flying tactical hardware are continuing requirements for the SWS. Requirements relate primarily to shipboard investments in (COTS/NDI) SWS subsystem equipment, including periodic refresh cycles, to ensure continued reliable performance of the weapon system for its extended service life to match the OHIO Class life extension. SPALTs also entail the application of available technology to eliminate personnel safety hazards, correct design deficiencies, maintain system effectiveness by resolving equipment operability problems, achieve logistic economies, and provide for shipboard subsystem D5 life extension modernization efforts. Funds are required to procure alterations to the SWS launcher and fire control subsystems; missile handling equipment, missile test and readiness equipment, and surface support equipment. Installation of approved SPALTs is performed on a turnkey basis in conjunction with the procurement of equipment. Use of COTS/NDI has been initiated and is being implemented in all subsystems, wherever possible. Launcher and Handling Equipment: Cost Code 6.1 increases in FY 2027 due to the procurement of 6 hoist controllers. Hoist controllers are essential for the safe and efficient operation of electric hoists and ensure precise control. Cost Code 6.2 FY 2027 increase due to the procurement of 4 cooling chambers, 1 Mobile Test Bed (MTB) 3 Consolidated Test Set (CTS) and 20 Variable Energy Ejector Valves to sustain long-term operational readiness. Fire Control Equipment: Cost Code 7.1 FY 2027 Increase due to the procurement of 1,246 PCD to support the Fire Control System. Personal computing devices are refreshed twice every 9 years, FY 2026 focused on the refresh cycle dedicated to PCD Development and Qualification tasks, and the second year for Procurement and Acceptance Test. Cost Code 7.2 FY 2027 Increase due to ramping up development of Fire Control System (FCS) revision (x62) CLB software variants needed during the period where both OHIO and CLB are operationally deployed and targeting compatibility must be maintained between the platforms. Navigation Equipment: Cost Code 8.2 decreases in FY 2027 due the procurement of Navigation Equipment, TR-143A transducer decreasing from 7 to 5 units. Cost Code 8.4 FY 2027 decrease due to the completion of the Broadband Navigation Sonar (BBNS) testing and validation for the tactical navigational aids (NAVAIDS) system. ALTERATIONS (SSI and SSMP) The majority of the Alterations funding supports the Shipboard System Integration (SSI) program which utilizes a COTS based strategy that integrates common electronics (from Fire Control, Launcher, Navigation and Shipboard Data Recording Systems) into the fire control sub-system as well as refreshing inertial systems in order to ensure the TRIDENT II (D5) weapon system can be sustained to support both the OHIO class submarines through their end of life as well as support the COLUMBIA class submarines currently in production. Below is a description of each current SSI Increment (Inc): LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 6 of 20 P-1 Line #108 Volume 4 - 84 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 4: FBM Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Program Elements for Code B Items: N/A Other Related Program Elements: 0603561N, 0603595N, 0603570N, 0901211N, 0805376N, 0101228N Line Item MDAP/MAIS Code: N/A SSI Inc 8: Inc 8 provides replacement of the 30-year-old Electrostatic Gyro Navigator (ESGN) which needs a refresh of inertial technology components, replacement of the Electronic Equipment Consoles (EEC), and updates to Navigation Subsystem software to accommodate the ESGN replacement navigator. Also, provides SWS subsystem SPALTs for FCS and TTF NAV Lab trainers, and SDS/DRS Software SPALT changes which are driven by data requirement changes. The SHIPALTs retain NAV Center bedplate, cabling, chilled water/ventilation, and retain electrical power. The current ESGN was designed and deployed in the early 1980s with a 20-year designed service live. This refresh is critical to ensure the program continues to meet USSTRATCOM requirements, and to ensure the operational availability of the OHIO, VANGUARD, COLUMBIA and Dreadnought SSBNs. Cost Code 10.4 Funding decreases in FY 2027 as SHIPALT installation completes on the final boat. Cost Code 10.6 decreases in FY 2027 due to completion of fault isolation capability for Gyroscopes. SSI Inc 15: Inc 15 provides pre-configuration and post-configuration support of Inc 8 and Inc 11. Inc 15 is a critical path and the baseline for the deployment of the COLUMBIA Class SSBN. Inc 15 involves refreshes to several subsystems such as alterations for fire control equipment, navigation, launcher, and trainer subsystems. SSP reduced the efforts of SSI Inc 15 to the minimally required effort to address obsolescence issues which are required for the SWS to be the initial baseline for the COLUMBIA class SSBN. Inc 15 efforts in FY 2027 include: Cost Code 13.4 decreases in FY 2027 is due to the completion of installations of Increment 15 initial installation proofing efforts. Installed equipment includes MIN Network Switch, Server, Portable Network Device and Portable Computing Devices, along with the mechanical mounting components and cabling and associated software. SHIPBOARD SYSTEMS MODERNIZATION PORTFOLIO (SSMP) Program SSMP is an integrated modernization program structured and phased with SSI to leverage the established industrial base supporting all aspects of the Shipboard sub-systems. This will enable the SWS to be more agile and adaptable to the evolving threats and warfighter needs. Cost Code 14.1: Advanced Development and Technology decreases in FY 2027 as development efforts for General Purpose Computing (GPC) element shift into production. COLUMBIA CLASS: Cost code 16.1 funding for COLUMBIA Class TRIPER spares was initiated in FY 2022. FY 2027 funds continue Kings Bay and Bangor Team Trainer procurements and TRIPER spares procurements. FY 2027 also includes Industrial Plant Equipment procurement, which will continue through 2031. Cost Code 16.2 FY 2027 decreases due to the completion of the training equipment refresh. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 7 of 20 P-1 Line #108 Volume 4 - 85 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Strategic Missile Systems Equip Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) Other Material Support- Launcher and Handling Equipment 1.1) Gas Generator Production (1)(†) 1.2) Gas Generator Case Hardware (2) 1.3) Ballast Support Equipment (3) A A A Subtotal: 1) Other Material SupportLauncher and Handling Equipment - - - - - 10.162 - - - 261.111 18 4.700 - - - - - - - - 4.885 - - - - - - - 10.162 - - 4.700 - - - 80.563 - - 8.143 - - 47.753 - - - - 9.029 - - - 20.013 - - - 371.696 23 8.549 - - - - - 2.581 - - - 3.713 - - 1.894 - - - 8.598 - - 13.024 - - - 7.850 - - 11.692 8.319 - - 3.634 - - - 1.002 - - 1.022 - - - 3.280 - - 5.297 107.138 - - 13.748 - - - 264.496 - - 34.492 - - - 7.500 - - 7.650 - - 7.500 - - 7.650 371.696 23 8.549 - - 2.581 - - - 1.894 - - - - 13.024 - - - - - 11.692 5.335 - - - - - 5.335 - 1.042 - - - - - 1.042 - - 5.402 - - - - - 5.402 14.297 - - 14.582 - - - - - 14.582 - 32.100 - - 38.053 - - - - - 38.053 - - 7.599 - - 7.750 - - - - - 7.750 - - 7.599 - - 7.750 - - - - - 7.750 1.643 - - - 2) Other Material Support-Fire Control Equipment 2.1) Nirop Capital Maintenance (4) 2.2) Fire Control Auxillary Support Equipment A A (5) 2.3) D5 Targeting Hardware A 2.4) Advanced Inventory Logistics (SAIL) A 2.5) Targeting Software Refresh A Subtotal: 2) Other Material SupportFire Control Equipment 3) Other Material Support-Navigation Equipment 3.1) ESGN(R) Stable Platform & Housing Mat. & Shock Isolation System Kits A Subtotal: 3) Other Material SupportNavigation Equipment 4) Other Material Support- Instrumentation/Missile Checkout Equipment 4.1) Umbilical Sets/ (†) A Kits 4.2) Data System Integration A 4.3) Flight Test Instrumentation (FTI) A Refresh (6) Subtotal: 4) Other Material SupportInstrumentation/Missile Checkout Equipment 2,103.100 10 21.031 1,826.000 1 1.826 1,631.000 1 1.631 1,643.000 1 1,643.000 1 1.643 - - 3.525 - - - - - - - - - - - - - - - - - 94.847 - - 36.766 - - 27.725 - - - - - - - - - - - 119.403 - - 38.592 - - 29.356 - - 1.643 - - - - - 1.643 5) Other Material Support- Information Technology LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 8 of 20 P-1 Line #108 Volume 4 - 86 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.1) Hardware/ Software IT A Procurement MAIS Code (7) Subtotal: 5) Other Material SupportInformation Technology Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Strategic Missile Systems Equip FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - - 54.426 - - 5.061 - - 7.938 - - 9.975 - - - - - 9.975 - - 54.426 - - 5.061 - - 7.938 - - 9.975 - - - - - 9.975 10 15.735 - - 2.493 - - 2.934 - - 3.306 - - - - - 3.306 - - 117.352 - - 12.153 - - 10.917 - - 20.128 - - - - - 20.128 - - 133.087 - - 14.646 - - 13.851 - - 23.434 - - - - - 23.434 - - 4.034 - - - - - 0.731 - - 4.333 - - - - - 4.333 - - 104.474 - - 17.760 - - 20.711 - - 26.212 - - - - - 26.212 - - 108.508 - - 17.760 - - 21.442 - - 30.545 - - - - - 30.545 - - 22.622 - - 2.164 - - 2.252 - - 2.297 - - - - - 2.297 - - 29.657 - - 7.794 - - 8.444 - - 5.631 - - - - - 5.631 - - 38.071 - - - - - - - - - - - - - - - - - 7.852 - - 1.950 - - 1.492 - - - - - - - - - - - 98.202 - - 11.908 - - 12.188 - - 7.928 - - - - - 7.928 - - 15.375 - - 3.121 - - 3.183 - - 3.246 - - - - - 3.246 - - 15.375 - - 3.121 - - 3.183 - - 3.246 - - - - - 3.246 210 115.361 - - - - - - - - - - - - - - - 6) Alterations-Launcher and Handling Equipment 6.1) D5 Hoist (8) 6.2) Launcher SPALTs (9) A A Subtotal: 6) Alterations-Launcher and Handling Equipment 1,573.500 7) Alterations-Fire Control Equipment 7.1) Portable Computing Devices (PCD) Refresh SPALT A 7.2) Minor SPALTS A (10) (11) Subtotal: 7) Alterations-Fire Control Equipment 8) Alterations-Navigation Equipment 8.1) Legacy ESGN SPALTs A 8.2) Transducer A SPALTs (12) 8.3) Navigation Software SPALTs A 8.4) Broadband Navigation SONAR A System (13) Subtotal: 8) Alterations-Navigation Equipment 9) Alterations-Instrumentation/Missle Checkout Equipment 9.1) Forecast Instrumentation SPALTs A Subtotal: 9) AlterationsInstrumentation/Missle Checkout Equipment 10) SSI Increment 8 10.1) Navigation SSI Increment 8 Production Gyroscope A 549.338 LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 9 of 20 P-1 Line #108 Volume 4 - 87 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 10.2) Navigation SSI Increment 8 On Board Repair Parts (OBRPs) A 10.3) Navigation SSI Increment 8 A (†) Production INS 10.4) Navigation SSI Increment 8 SHIPALT / Integration A 10.5) Navigation SSI Increment 8 Installation A MAIS Code Unit Cost ($ K) - FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Strategic Missile Systems Equip FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - 50.492 - - - - - - - - - - - - - - - 32 95.702 - - - - - - - - - - - - - - - - - 41.305 - - 5.376 - - 3.544 - - - - - - - - - - - 28.287 - - 6.133 - - - - - - - - - - - - - - 5.570 - - 2.901 - - 2.833 - - - - - - - - - - - 336.717 - - 14.410 - - 6.377 - - - - - - - - - - - 8.927 - - 0.912 - - - - - - - - - - - - - - 13.800 - - 0.972 - - - - - - - - - - - - - - 22.727 - - 1.884 - - - - - - - - - - - - - - 44.531 - - 1.216 - - - - - - - - - - - - - - 0.551 - - - - - - - - - - - - - - - 23 52.814 - - - - - - - - - - - - - - - - - 14.902 - - - - - - - - - - - - - - - - - 112.798 - - 1.216 - - - - - - - - - - - - 2,990.688 (14) 10.6) Gyroscope Fault Isolation Capability (15) A Subtotal: 10) SSI Increment 8 11) SSI Increment 11 11.1) Launcher SSI Increment 11 LIS Fiberoptic Cables Installation A 11.2) Fire Control SSI Increment 11 LIS SPALT Installs A Subtotal: 11) SSI Increment 11 12) SSI Increment 13 12.1) Instrumentation/ Missile SSI Increment 13 MTRE Refresh A 12.2) Navigation SSI Increment 13 On Board Repair Parts (OBRPs) A 12.3) Fire Control SSI Increment 13 Electronics Refresh A SPALT Kits 2,296.261 (†) 12.4) Fire Control and Navigation SSI Increment 13 Installation A Subtotal: 12) SSI Increment 13 13) SSI Increment 15 LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 10 of 20 P-1 Line #108 Volume 4 - 88 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 13.1) Fire Control SSI Increment 15 Refresh/ Redesign A 13.2) Fire Control SSI Increment 15 A MAIS Code Unit Cost ($ K) Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) Unit Cost ($ M) ($ M) - - - - - - - 5.112 - - 7.502 - - 4.632 - - 149.619 - - 11.113 - - - - 39.845 - - 19.198 - - - 33.509 - - 26.392 - - 23.484 - - - - 19.796 - - - - - - - ($ M) - - - - - - - 2.932 - - - - - 2.932 8.507 - - 6.884 - - - - - 6.884 - 19.581 - - 11.309 - - - - - 11.309 - - 32.077 - - 32.245 - - - - - 32.245 20.802 - - 21.218 - - 21.642 - - - - - 21.642 - 18.687 - - 18.493 - - 18.862 - - - - - 18.862 - - - - - 35.840 - - 36.320 - - - - - 36.320 116.634 - - 85.079 - - 127.209 - - 120.378 - - - - - 120.378 - 176.505 - - 12.269 - - 12.514 - - 12.764 - - - - - 12.764 - - 176.505 - - 12.269 - - 12.514 - - 12.764 - - - - - 12.764 - - 71.570 - - 45.524 - - 198.119 - - 52.285 - - - - - 52.285 - - 27.877 - - 11.266 - - 2.198 - - 0.032 - - - - - 0.032 Subtotal: 16) Columbia Class - - 99.447 - - 56.790 - - 200.317 - - 52.317 - - - - - 52.317 Total - - 1,825.606 - - 320.691 - - 491.179 - - 327.941 - - - - - 327.941 Subtotal: 13) SSI Increment 15 - 790.400 5 - (Each) - Installation - ($ K) - A 3.176 ($ M) - (16) - (Each) Total Cost Qty - 3.875 - ($ K) Unit Cost - 13.4) Increment 15 Fire Control - ($ M) Qty - A 22.746 5 - (Each) Unit Cost 3.952 13.3) Launcher SSI Increment 15 Refresh & Systems Integration 21 775.000 - Qty FY 2027 Total Total Cost - 3.611 - ($ K) FY 2027 OOC Total Cost - 3 - (Each) Unit Cost 118.585 1,203.667 - Qty - 1,083.143 - ($ K) FY 2027 Base Total Cost - Production - FY 2026 Total Cost - (†) - FY 2025 Total Cost Aggregated Items Title: Strategic Missile Systems Equip - 790.400 - 5 3.952 14) Shipboard Systems Modernization Portfolio (SSMP) 14.1) Advanced Development & Tech Maturation A (17) 14.2) Shipboard ReArchitecture A 14.3) Obsolescence Management A 14.4) Capability Insertion A 14.5) SSMP Production Hardware A Subtotal: 14) Shipboard Systems Modernization Portfolio (SSMP) 15) Training Support Equipment 15.1) Training Support Equipment A Subtotal: 15) Training Support Equipment 16) Columbia Class 16.1) Columbia TRIPER spares (18) 16.2) SWSS Trainer Equipment (19) A A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 11 of 20 P-1 Line #108 Volume 4 - 89 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Aggregated Items Title: Strategic Missile Systems Equip Footnotes: (1) Cost Code 1.1 FY 2027 Funding increase due to the procurement of 23 Gas Generators to support Sea leg capacity expansion, an increase from 0 in FY 2026. The production unit cost for these generators has been adjusted upward to account for inflationary impacts and realized increases in material and production costs from the industrial base. (2) Cost Code 1.2 funding provides the procurement and qualification of GG Case Hardware required to replace cases for expended/fired GGs. Funding in this category fluctuates year to year due to flight schedules. FY 2027 decreases due to the quantity of gas generator hardware decreasing to 10 and PreLoading Indicating (PLI) Washer decreasing to 0. (3) (4) Cost Code 1.3 FY 2027 decrease due to the procurement of 3 Ballast Transport Fixtures (BTFs) from 6 in FY 2026. Funding fluctuates annually based on specific maintenance projects necessary to correct environmental, safety, and energy conservation deficiencies. FY 2027 scope includes OP1 Air Handler Refresh and OP3 Load Center Replacement. Electrical Load Centers at the Pittsfield NIROP are large, integrated critical systems that combine a transformer, switchgear, and a breaker box into a single housing. (5) Cost Code 2.2 FY 2027 increase due to a full redesign of the Missile Simulator Interface (MSI) and and the Missile Interface Test Module (MITM) Module for Training Stimulation System (TSS) and the Weapon System Simulator (WSS). MSI and MITM support the fleet training TSS and troubleshooting and validation of tactical systems WSS. Without these modules and the fleet cannot be supported for missile interface testing and validation. (6) (7) Cost Code 4.3 FY 2027 decrease due to the completion of the refresh of the Portable Antenna Telemetry System (PATS). There are no refreshes this year. Cost Code 5.1 funding in all years provides for non-tactical IT equipment acquisitions (hardware and related software) in support of the SSP enterprise. This includes the IT hardware and software components connected to the Strategic Weapons System Network (SWSNET). FY 2027 increase to support the expanding workforce required for new nuclear modernization programs including D5LE2. (8) (9) Cost Code 6.1 increases in FY 2027 due to the procurement of 6 hoist controller. Hoist controllers are essential for the safe and efficient operation of electric hoists and ensure precise control. Cost Code 6.2 FY 2027 increase due to the procurement of 4 cooling chambers, 1 Mobile Test Bed (MTB) 3 Consolidated Test Set (CTS) and 20 Variable Energy Ejector Valves to sustain long-term operational readiness. (10) Cost Code 7.1 FY 2027 Increase due to the procurement of 1,246 PCD to support the Fire Control System. Personal computing devices are refreshed twice every 9 years, FY 2026 focused on the refresh cycle dedicated to PCD Development and Qualification tasks, and the second year for Procurement and Acceptance Test. (11) Cost Code 7.2 increase in FY 2027 due to ramping up development of FCS revision (x62) CLB software variants needed during the period where both OHIO and CLB are operationally deployed and targeting compatibility must be maintained between the platforms. (12) (13) (14) (15) (16) Cost Code 8.2 decreases in FY 2027 due the procurement of TR-143A transducer decreasing from 7 to 5 units. Cost Code 8.4 FY 2027 decrease due to the completion of the Broadband Navigation Sonar (BBNS) testing and validation for the tactical navigational aids (NAVAIDS) system. Cost Code 10.4 Funding decreases in FY 2027 as SHIPALT installation completes on the final boat. Cost Code 10.6 decreases in FY 2027 due to completion of fault isolation capability for Gyroscopes. Cost Code 13.4 decreases in FY 2027 is due to ramp down of installations of Increment 15 initial installation proofing efforts. Installed equipment includes MIN Network Switch, Server, Portable Network Device and Portable Computing Devices, along with the mechanical mounting components and cabling and associated software. (17) (18) Cost Code 14.1 decreases in FY 2027 as development efforts shift into production. FY 2027 decrease from FY 2026 is driven by the reduction to the funding for the Kings Bay team trainers and Kings Bay technical trainers, as well as a reduction to Industrial Plant Equipment procurements that will begin to close out for Kings Bay in FY 2027. FY 2027 continues TRIPER spare procurements which will go through FY 2043. (19) Cost Code 16.2 FY 2027 decreases due to the completion of the training equipment refresh. LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 12 of 20 P-1 Line #108 Volume 4 - 90 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Contractor and Location Method/Type or Funding Vehicle Location of PCO Aggregated Items: Strategic Missile Systems Equip Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 1) Other Material Support- Launcher and Handling Equipment 1.1) Gas Generator Production (1) 1.1) Gas Generator Production (1) NORTHROP GRUMMAN 2025 (20) / Rocket Center, WV NORTHROP GRUMMAN 2027 (20) / Rocket Center, WV C / CPFF Washington Navy Yard, DC Mar 2025 Mar 2027 18 261.111 Y C / CPFF Washington Navy Yard, DC Oct 2026 Oct 2028 23 371.696 N 4) Other Material Support- Instrumentation/Missile Checkout Equipment 4.1) Umbilical Sets/Kits 4.1) Umbilical Sets/Kits 4.1) Umbilical Sets/Kits 4.1) Umbilical Sets/Kits 4.1) Umbilical Sets/Kits 2023 Lockheed Martin / Sunnyvale,CA C / CPIF Washington Navy Yard, DC Oct 2022 Oct 2025 1 1,756.000 Y 2024 Lockheed Martin / Sunnyvale,CA C / CPFF Washington Navy Yard, DC Oct 2023 Oct 2026 1 1,791.000 Y 2025 Lockheed Martin / Sunnyvale,CA C / CPFF Washington Navy Yard, DC Oct 2024 Oct 2027 1 1,826.000 Y 2026 Lockheed Martin / Sunnyvale,CA C / CPFF Washington Navy Yard, DC Oct 2025 Oct 2028 1 1,631.000 Y 2027 Lockheed Martin / Sunnyvale,CA C / CPFF Washington Navy Yard, DC Oct 2026 Oct 2029 1 1,643.000 Y 2019 Lockheed Martin (SSI Increment #8 Inertial Navigation System (INS)) / Mitchfield,NY C / CPIF Washington Navy Yard, DC Nov 2018 Feb 2020 2 3,778.000 Y 2021 Lockheed Martin (SSI Increment #8 Inertial Navigation System (INS)) / Mitchfield,NY C / CPIF Washington Navy Yard, DC Jan 2021 Apr 2022 9 2,902.333 Y 2022 Lockheed Martin (SSI Increment #8 Inertial Navigation System (INS)) / Mitchfield,NY C / CPIF Washington Navy Yard, DC Nov 2021 Feb 2023 10 2,960.400 Y 2023 Lockheed Martin (SSI Increment #8 Inertial Navigation System (INS)) / Mitchfield,NY C / CPIF Washington Navy Yard, DC Oct 2022 Jan 2024 11 2,947.364 Y 2019 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPIF Washington Navy Yard, DC Oct 2018 Oct 2019 6 2,349.167 Y 2020 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPIF Washington Navy Yard, DC Oct 2019 Oct 2020 6 2,342.833 Y 2021 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPIF Washington Navy Yard, DC Nov 2020 Nov 2021 5 2,825.800 Y 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS (†) 10.3) Navigation SSI Increment 8 Production INS (†) 10.3) Navigation SSI Increment 8 Production INS (†) 10.3) Navigation SSI Increment 8 Production INS (†) 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 (†) Electronics Refresh SPALT Kits 12.3) Fire Control SSI Increment 13 (†) Electronics Refresh SPALT Kits 12.3) Fire Control SSI Increment 13 (†) Electronics Refresh SPALT Kits LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 13 of 20 P-1 Line #108 Volume 4 - 91 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Method/Type or Funding Vehicle Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2022 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPIF Washington Navy Yard, DC Nov 2021 Nov 2022 6 1,755.500 Y 13.2) Fire Control SSI Increment 15 Production 2022 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DC Jul 2022 Sep 2023 4 2,172.500 Y 13.2) Fire Control SSI Increment 15 Production 2023 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DC Oct 2022 Dec 2023 12 769.917 Y 13.2) Fire Control SSI Increment 15 Production 2024 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DCWashington Navy Yard, DC Jan 2024 Jan 2025 5 786.800 Y 13.2) Fire Control SSI Increment 15 Production 2025 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DC Jan 2025 Jan 2026 3 1,203.667 Y 13.2) Fire Control SSI Increment 15 Production 2026 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DC Jul 2026 Jul 2027 5 775.000 Y 13.2) Fire Control SSI Increment 15 Production 2027 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) / Pittsfield, MA C / CPFF Washington Navy Yard, DC Oct 2026 Oct 2027 5 790.400 Y 12.3) Fire Control SSI Increment 13 (†) Electronics Refresh SPALT Kits Location of PCO Aggregated Items: Strategic Missile Systems Equip (Each) RFP Issue Date 13) SSI Increment 15 (†) indicates the presence of a P-21 Footnotes: (20) Formerly known as Alliant Tech Systems LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 14 of 20 P-1 Line #108 Volume 4 - 92 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Strategic Missile Systems Equip Fiscal Year 2019 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS 7 2019 NAVY 2 0 2 7 2021 NAVY 9 0 9 A - - - - - - - - - - - - - - - 1 1 0 9 7 2022 NAVY 10 0 10 10 7 2023 NAVY 11 0 11 11 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 Electronics Refresh SPALT Kits 8 2019 NAVY 6 0 6 8 2020 NAVY 6 0 6 8 2021 NAVY 5 0 5 8 2022 NAVY 6 0 6 A - - - - - - - - - - - - 1 1 A - 1 - 1 - 1 - 1 - 0 - - - - - - - 6 5 6 O C T LI 5358 - Strategic Missile Systems Equip Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #108 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 93 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Strategic Missile Systems Equip Fiscal Year 2021 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS 7 2019 NAVY 2 2 0 7 2021 NAVY 9 0 9 7 2022 NAVY 10 0 10 7 2023 NAVY 11 0 11 0 A - - - - - - - - - - - - - - - A - - - - - 1 2 - 1 - 2 - 1 - 2 - - 0 10 11 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 Electronics Refresh SPALT Kits 8 2019 NAVY 6 6 0 8 2020 NAVY 6 0 6 8 2021 NAVY 5 0 5 8 2022 NAVY 6 0 6 0 1 1 1 A - 1 - 1 - 1 - 0 - - - - - - - - 1 1 A O C T LI 5358 - Strategic Missile Systems Equip Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 20 S E P O C T N O V 1 D E C 1 J A N 1 F E B P-1 Line #108 0 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 94 6 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Strategic Missile Systems Equip Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS 7 2019 NAVY 2 2 0 7 2021 NAVY 9 9 0 0 7 2022 NAVY 10 0 10 - - - - 7 2023 NAVY 11 0 11 A - - - - 0 1 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 0 - - 1 1 1 1 1 1 1 1 1 2 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 Electronics Refresh SPALT Kits 8 2019 NAVY 6 6 0 0 8 2020 NAVY 6 6 0 0 8 2021 NAVY 5 5 0 8 2022 NAVY 6 0 6 0 O C T LI 5358 - Strategic Missile Systems Equip Navy 1 N O V 1 D E C 1 J A N 1 F E B 1 M A R 1 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #108 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 95 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Strategic Missile Systems Equip Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS 7 2019 NAVY 2 2 0 0 7 2021 NAVY 9 9 0 0 7 2022 NAVY 10 10 0 7 2023 NAVY 11 9 2 0 1 1 0 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 Electronics Refresh SPALT Kits 8 2019 NAVY 6 6 0 0 8 2020 NAVY 6 6 0 0 8 2021 NAVY 5 5 0 0 8 2022 NAVY 6 6 0 0 O C T LI 5358 - Strategic Missile Systems Equip Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #108 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 96 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Strategic Missile Systems Equip Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 10) SSI Increment 8 10.3) Navigation SSI Increment 8 Production INS 7 2019 NAVY 2 2 0 0 7 2021 NAVY 9 9 0 0 7 2022 NAVY 10 10 0 0 7 2023 NAVY 11 11 0 0 12) SSI Increment 13 12.3) Fire Control SSI Increment 13 Electronics Refresh SPALT Kits 8 2019 NAVY 6 6 0 0 8 2020 NAVY 6 6 0 0 8 2021 NAVY 5 5 0 0 8 2022 NAVY 6 6 0 0 O C T LI 5358 - Strategic Missile Systems Equip Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 20 S E P O C T N O V D E C J A N F E B P-1 Line #108 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 97 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5358 / Strategic Missile Systems Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 4 Production Rates (Each / Year) MFR Ref # Aggregated Items: Strategic Missile Systems Equip Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin (SSI Increment #8 Inertial Navigation System (INS)) Mitchfield,NY 6 12 16 0 0 15 15 0 0 15 15 2 General Dynamics (SSI Increment #13 FC Electronic Refresh SPALT Kits) Pittsfield, MA 2 5 15 0 0 12 12 0 0 12 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5358 - Strategic Missile Systems Equip Navy UNCLASSIFIED Page 20 of 20 P-1 Line #108 Volume 4 - 98 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604562N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,440.789 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,440.789 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,440.789 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 153.237 153.237 153.237 102.954 102.954 102.954 165.416 - 0.000 - 165.416 - 0.000 - 165.416 0.000 165.416 165.416 165.416 178.525 178.525 178.525 208.166 208.166 208.166 211.571 211.571 211.571 To FY 2031 Complete 238.382 Continuing 238.382 Total - Continuing Continuing - Continuing - - Continuing Continuing 6.659 Continuing Continuing 238.382 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.865 0.801 3.729 - 3.729 4.862 5.370 7.174 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/BYG-1 is the combat control system common across all submarine platforms which incorporates tactical control, weapon/payload control and Tactical Local Area Network (TacLAN) functions into a single procurement program. AN/BYG-1 allows the submarine to rapidly update the ship-safety tactical picture, integrates the common tactical picture into the battlegroup, improves torpedo interfaces, and provides tactical TOMAHAWK, Harpoon counter measures, and other payload capabilities. AN/BYG-1 systems will be continuously updated with hardware enhancements to address Commercial Off The Shelf (COTS) obsolescence, and provide capability improvements through software upgrades. Hardware updates are referred to as Tech Insertion (TI) kits and are differentiated by year of development (i.e. TI-20, TI-22, TI-24, TI-26, etc.). The TI upgrades provide the baseline for all future AN/BYG-1 procurements. AN/BYG-1 is part of the Submarine Warfare Federated Tactical Systems (SWFTS), a family of interdependent systems that conduct cooperative system development and installations. As a result of this interdependency, AN/BYG-1 installations must be performed in conjunction with the installations of the other SWFTS systems. VB011 - COMBAT SYSTEMS TECHNOLOGY REFRESH / LEGACY INTEGRATION Procures Engineering Changes (EC) and Ordnance Alterations (ORDALT) to correct fleet reported problems with fielded AN/BYG-1 software and hardware. Procures Weapons Launch Systems and training systems, including the Multi-tube Weapon Simulator (MTWS) and the Onboard Team Trainer. Provides system engineering in support of TacLAN, and Cybersecurity for AN/BYG-1 authorization and accreditation. Procures Infrastructure COTS H/W in order to enable faster delivery, installation, and updating of developed systems to the warfighter by creating a cyber-resilient environment that links the system developers to the fielded systems. Procures TIH Modernization hardware to allow flexible, efficient utilization of the fielded computing systems, providing the opportunity for dynamic response and recovery when the system is under cyber-attack, and positioning SWFTS to leverage the developing fields of Artificial Intelligence and Machine Learning. Architecture efforts focused on automated testing, cyber resiliency and rapid capability delivery to improve reliability and increase operational availability. VB034 - SUBMARINE COMBAT CONTROL SYSTEM MODERNIZATION PROGRAM Procures hardware and software upgrades for AN/BYG-1 system for installation on all submarine platforms. Efforts include pre-production, design, hardware production, and integration. Funds are for the installation of Combat Control System equipment included in the Fleet Modernization Program. VB800 - ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM Procures the Submarine Electronic Charting Display Information System - Navy ECDIS on all U.S. Navy submarine platforms. PEO UWS Submarine Combat and Weapons Control Program Office has program acquisition, contractual, financial, engineering and logistical responsibilities for submarine Navy ECDIS systems. This includes conducting submarine Navy ECDIS integration, integration testing, NAVCERT, and fielding responsibilities in support of all baselines. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 1 of 27 P-1 Line #109 Volume 4 - 99 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604562N Line Item MDAP/MAIS Code: N/A VB995 - PRODUCTION ENGINEERING AND INITIAL TRAINING Procures production and logistics support, assistance for asset management, cost analyses, preparation of contract specifications, monitoring of contract deliverables, contractor cost, schedule and performance monitoring, Integrated Logistics Support (ILS) planning and Government Furnished Information (GFI) coordination. Also provides initial training curriculum development, training management materials, exercise control group development, and pilot services to the Fleet. VB997 - SSGN SUSTAINING SUPPORT Provides funding to the Strategic Systems Program (SSP) in support of the Equipment procurement, installation and sustainment required for the life-cycle operational support of SSGN Attack Weapons Systems (AWS) currently on four OHIO-class SSGNs. Funding provides the end-of-life technical refresh of critical components and maintain cyber security posture for to the Attack Weapon Control System (AWCS) and the Attack Weapons System Interface Simulator (AWIS). AWCS technical refresh includes Training Mode Enhancements and updates to Maintenance Interface Network requires an update to the operating system to maintain Missile Technician training on board the SSGN. Funding ended in FY25. VB700 - PAYLOAD PROCUREMENT Procurement of payloads to include Unmanned Aerial System (UAS) vehicles for integration, verification, and validation. Procurement entails integrated, modified, and tested horizontally and vertically deployed payloads. SLUAS transferred to OPN Line Item 2210 in FY25. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 2 of 27 P-1 Line #109 Volume 4 - 100 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604562N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a SSN Combat Control Systems P-3a 1 / VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS (SSBN CLASS) P-3a 2 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS (UPGRADE) P-3a 3 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS (UPGRADE) P-3a 4 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS (UPGRADE) P-3a 5 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL (UPGRADE) P-3a 6 / VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS (UPGRADE) P-3a 7 / VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL (UPGRADE) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - Title* / 768.022 - / 68.352 - / 34.752 - / 72.014 - / 9.680 - / 16.735 - / 13.870 - / 12.160 - / 54.158 - / 6.238 - / 0.000 - - / 368.141 - / 4.465 - / 0.000 - / 161.663 - / 10.656 - - / 79.125 - / 38.394 - / 0.000 - / 0.000 - Exhibits Schedule Exhibit Type Prior Years Subexhibits ID CD MDAP/ MAIS Code / 0.000 - / 1,440.789 / - - / 72.014 - / 0.000 - / 12.160 / 0.000 - / 0.000 - / 0.000 - / 6.690 - / 0.000 - / 6.690 / 12.787 - / 12.572 - / 0.000 - / 12.572 - / 27.173 - / 26.151 - / 0.000 - / 26.151 - / 8.610 - / 5.199 - / 0.000 - / 5.199 / 8.397 - / 153.237 - - / 5.762 - / 30.630 - / 0.000 - / 30.630 / 102.954 - / 165.416 - / 0.000 - / 165.416 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SSN Combat Control Systems P-3a 1 / VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS (SSBN CLASS) - / - - / - - / - - / - - / 7.665 - / 7.830 - / 4.966 - / 0.000 P-3a 2 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS (UPGRADE) - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS (UPGRADE) - / 16.365 - / 9.755 - / 10.649 - / 18.845 P-3a 4 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS (UPGRADE) - / 11.024 - / 20.006 - / 8.937 - / 0.000 P-3a 5 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL (UPGRADE) - / 22.422 - / 38.083 - / 51.394 - / 74.934 P-3a 6 / VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS (UPGRADE) - / 0.000 - / 10.643 - / 17.131 - / 17.559 P-3a 7 / VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL (UPGRADE) - / 49.229 - / 50.415 - / 51.491 - / 52.592 P-40 Total Gross/Weapon System Cost - / 178.525 - / 208.166 - / 211.571 - / 238.382 - / - - / - Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 3 of 27 P-1 Line #109 Volume 4 - 101 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604562N Line Item MDAP/MAIS Code: N/A Justification: FY 2027 SSN Combat Control Systems was increased from FY26 by $62.462M to support increased hardware procurements and modernization. ITEM 1.1 ECP/AUXILLARY EQUIPMENT / LEGACY INTEGRATION: Increased funding in FY 2027 to support re-instituting Engineering Changes (EC) and Ordnance Alterations (ORDALT). ITEM 1.2 WEAPON LAUNCH SYSTEMS TECH INSERTION: Decreased funding in FY 2027 due to the completion of long lead material for the Common Weapon Launcher. ITEM 1.3 TACLAN/IA: Increased funding in FY 2027 to support re-instituting capability development and improvements to the Tactical Local Area Network (TACLAN) and Information Assurance (IA) sub-systems. ITEM 1.4 INFRASTRUCTURE COTS HARDWARE: Increased funding in FY 2027 to support additional COTS lab hardware investments to support increased AN/BYG-1 capabilities. ITEM 1.6 SUBMARINE WARFARE FEDERATED TACTICAL SYSTEMS (SWFTS) ARCHITECTURE: Increased funding in FY 2027 to support architecture efforts focused on automated testing, cyber resiliency and rapid capability delivery to improve reliability and increase operational availability. ITEM 2.1 ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM: Increased funding in FY 2027 to support re-instituting Navy Electronic Chart Display and Information System (ECDIS) integration. ITEM 3.1 PRODUCTION ENGINEERING AND INITIAL TRAINING: Increased funding in FY 2027 to support increased technical and testing requirements associated with architecture improvements. VB034 PRODUCTION AND INSTALLATION: Increased in FY 2027 to support hardware upgrades and modernization of one (1) SSBN OHIO Class, two (2) SSN 688 Class, two (2) SSN 774 Class w/ CWL, and two (2) SSN 774 Blk V w/ CWL. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 4 of 27 P-1 Line #109 Volume 4 - 102 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SSN Combat Control Systems FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) VB011: COMBAT SYSTEM TECH REFRESH/LEGACY INTEGRATION 1.1) VB011: ECP/ AUXILLARY EQUIPMENT / LEGACY INTEGRATION A 1.2) VB011: WEAPON LAUNCH SYSTEMS TECH INSERTION A (2) 1.3) VB011: TACLAN/ IA - - 23.537 - - 2.432 - - - - - 2.328 - - - - - 2.328 - - 164.225 - - 28.484 - - 22.202 - - 21.096 - - - - - 21.096 - - 234.207 - - 14.638 - - - - - 13.425 - - - - - 13.425 - - 32.727 - - 2.097 - - 2.732 - - 3.208 - - - - - 3.208 - - 72.607 - - 14.573 - - 8.387 - - 8.445 - - - - - 8.445 - - - - - - - - - - - 18.141 - - - - - 18.141 - - - - 62.224 - - 33.321 - - 66.643 - - - - - 66.643 (1) (3) A 1.4) VB011: INFRASTRUCTURE COTS HARDWARE A 1.5) VB011: TIH MODERNIZATION A 1.6) SUBMARINE WARFARE FEDERATED TACTICAL SYSTEMS (SWFTS) A (4) ARCHITECTURE (5) Subtotal: 1) VB011: COMBAT SYSTEM TECH REFRESH/LEGACY INTEGRATION 527.303 2) VB800: ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM 2.1) VB800: ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM A - - 30.461 - - 3.761 - - - - - 3.911 - - - - - 3.911 - - 30.461 - - 3.761 - - - - - 3.911 - - - - - 3.911 (6) Subtotal: 2) VB800: ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM 3) VB995: PRODUCTION ENGINEERING AND INITIAL TRAINING 3.1) VB995: PRODUCTION ENGINEERING AND INITIAL TRAINING A - - 74.727 - - 1.977 - - 1.431 - - 1.460 - - - - - 1.460 - - 74.727 - - 1.977 - - 1.431 - - 1.460 - - - - - 1.460 (7) Subtotal: 3) VB995: PRODUCTION ENGINEERING AND INITIAL TRAINING 4) VB997: SSGN SUSTAINING SUPPORT LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 5 of 27 P-1 Line #109 Volume 4 - 103 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.1) VB997: SSGN SUSTAINING A SUPPORT MAIS Code (8) Subtotal: 4) VB997: SSGN SUSTAINING SUPPORT Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SSN Combat Control Systems FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 112.809 - - 0.390 - - - - - - - - - - - - - - 112.809 - - 0.390 - - - - - - - - - - - - 24 22.722 - - - - - - - - - - - - - - - 5) VB700: PAYLOAD PROCUREMENT 5.1) VB700: PAYLOAD PROCUREMENT A (9) 946,750.00 Subtotal: 5) VB700: PAYLOAD PROCUREMENT - - 22.722 - - - - - - - - - - - - - - - Total - - 768.022 - - 68.352 - - 34.752 - - 72.014 - - - - - 72.014 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) (3) (4) (5) ITEM 1.1 ECP/AUXILLARY EQUIPMENT / LEGACY INTEGRATION: Increased funding in FY 2027 to support re-instituting Engineering Changes (EC) and Ordnance Alterations (ORDALT). ITEM 1.2 WEAPON LAUNCH SYSTEMS TECH INSERTION: Decreased funding in FY 2027 due to the completion of long lead material for the Common Weapon Launcher. ITEM 1.3 TACLAN/IA: Increased funding in FY 2027 to support re-instituting capability development and improvements to the Tactical Local Area Network (TACLAN) and Information Assurance (IA) sub-systems. ITEM 1.4 INFRASTRUCTURE COTS HARDWARE: Increased funding in FY 2027 to support additional COTS lab hardware investments to support increased AN/BYG-1 capabilities. ITEM 1.6 SUBMARINE WARFARE FEDERATED TACTICAL SYSTEMS (SWFTS) ARCHITECTURE: Increased funding in FY 2027 to support architecture efforts focused on automated testing, cyber resiliency and rapid capability delivery to improve reliability and increase operational availability. (6) (7) (8) (9) ITEM 2.1 ELECTRONIC CHARTING DISPLAY INFORMATION SYSTEM: Increased funding in FY 2027 to support re-instituting Navy Electronic Chart Display and Information System (ECDIS) integration. ITEM 3.1 PRODUCTION ENGINEERING AND INITIAL TRAINING: Increased funding in FY 2027 to support increased technical and testing requirements associated with architecture improvements. The decrease in funding to the Strategic Systems Programs (SSP) SSGN support line is due to this funding line ending in FY25. Funding for VB700 transferred to OPN Line Item 2210 of PMS 415's budget as the Program Office responsible for execution of the Submarine Launched Unmanned Aerial System in FY25. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 6 of 27 P-1 Line #109 Volume 4 - 104 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 9.680 16.735 13.870 12.160 0.000 12.160 7.665 7.830 4.966 - - - - - - - - - 9.680 16.735 13.870 12.160 0.000 12.160 7.665 7.830 4.966 - - - - - - - - - 9.680 16.735 13.870 12.160 0.000 12.160 7.665 7.830 4.966 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 7 of 27 P-1 Line #109 Volume 4 - 105 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS Prior Years Financial Plan Modification Number / Title: 1 / VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS Related RDT&E PEs: 0604562N Modification Type: SSBN CLASS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic Subtotal: Recurring 3 / 5.635 - Subtotal: VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS Subtotal: Procurement, All Modification Items 2 / 4.641 / 5.635 - 3 / 5.635 - / 5.635 Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS - / 4.045 Subtotal: Installation - / 4.045 / 4.641 2 / 4.759 - 2 / 4.641 / 4.759 - 2 / 4.759 1 / 2.846 - / - / 2.846 - / - 1 / 2.846 - / - - / - - / 2.846 - / 2.903 / 0.000 - / 9.314 - / - - / 9.314 - / 4.641 - / 4.759 - / 2.846 - / 12.094 - / 9.111 - / 9.314 - / 12.094 - / 9.111 - / 9.314 - 1 / 2.846 - / 2.846 1 / 2.903 - 1 / 2.846 1 / 2.962 - / - - / - Continuing Continuing / 2.962 - / - - / - Continuing Continuing 1 / 2.962 - / - - / - Continuing Continuing - / 2.962 - / - - / - Continuing Continuing / 4.762 - / 4.868 - / 4.966 / 0.000 - / 0.000 - / 49.160 / 4.762 - / 4.868 - / 4.966 / - - / 0.000 - / 49.160 0.000 Continuing / 2.903 - 1 / 2.903 Installation - - Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 9.680 16.735 13.870 12.160 0.000 UNCLASSIFIED Page 8 of 27 12.160 7.665 7.830 P-1 Line #109 4.966 Continuing Volume 4 - 106 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS MDAP/MAIS Code: Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION OHIO CLASS Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jan 2030 FY 2030 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 4.045 3 / 12.094 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 16.139 FY 2025 - / - - / - 2 / 9.111 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 9.111 FY 2026 - / - - / - - / - 2 / 9.314 0 / 0.000 2 / 9.314 - / - - / - - / - - / - 0 / 0.000 2 / 9.314 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 4.762 - / - - / - - / - 0 / 0.000 1 / 4.762 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 4.868 - / - - / - 0 / 0.000 1 / 4.868 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.966 - / - 0 / 0.000 1 / 4.966 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 4.045 1 / 4.966 - / - 0 / 0.000 Installation Cost 3 / 12.094 2 / 9.111 2 / 9.314 0 / 0.000 2 / 9.314 1 / 4.762 1 / 4.868 10 / 49.160 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 3 - - - 2 - - - 2 - - - 1 - - - 1 - - - 1 - - - - - 10 Out - - - - 3 - - - 2 - - - 2 - - - 1 - - - 1 - - - 1 - - - - - 10 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 9 of 27 P-1 Line #109 Volume 4 - 107 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 54.158 6.238 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 54.158 6.238 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 54.158 6.238 0.000 0.000 0.000 0.000 0.000 0.000 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 10 of 27 P-1 Line #109 Volume 4 - 108 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS Prior Years Financial Plan Modification Number / Title: 2 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS Related RDT&E PEs: 0604562N Modification Type: UPGRADE FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic 9 / 23.711 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing / 23.711 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 9 / 23.711 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing - / 23.711 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS - / 30.447 - / 6.238 / 0.000 - / 0.000 - / 36.685 Subtotal: Installation - / 30.447 - / 6.238 / - - / 0.000 - / 36.685 0.000 Continuing Subtotal: Recurring - Subtotal: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS Subtotal: Procurement, All Modification Items Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 54.158 6.238 0.000 0.000 0.000 UNCLASSIFIED Page 11 of 27 0.000 0.000 0.000 P-1 Line #109 0.000 Continuing Volume 4 - 109 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS MDAP/MAIS Code: Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN21 CLASS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 8 / 30.447 9 / 36.685 Prior Years 1 / 6.238 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.238 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 8 / 30.447 9 / 36.685 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 8 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 9 Out 8 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 9 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 12 of 27 P-1 Line #109 Volume 4 - 110 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 368.141 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 368.141 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS 368.141 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 4.465 0.000 6.690 0.000 6.690 16.365 9.755 10.649 - - - - - - - - 4.465 0.000 6.690 0.000 6.690 16.365 9.755 10.649 - - - - - - - - 4.465 0.000 6.690 0.000 6.690 16.365 9.755 10.649 To FY 2031 Complete 18.845 Continuing - Continuing - 18.845 Continuing - Total - Continuing - - 18.845 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 13 of 27 P-1 Line #109 Volume 4 - 111 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS Prior Years Financial Plan Modification Number / Title: 3 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS Related RDT&E PEs: 0604562N Modification Type: UPGRADE FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic 63 / 180.937 - / - - / - / 180.937 - / - - / - 63 / 180.937 - / - - / - - / 180.937 - / - - / - Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS - / 187.204 - / 4.465 / 0.000 Subtotal: Installation - / 187.204 - / 4.465 Subtotal: Recurring Subtotal: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS Subtotal: Procurement, All Modification Items - 2 / 6.690 - / - / 6.690 - / - 2 / 6.690 - / - - / 6.690 - / - - / 6.690 - / 0.000 / 0.000 - - 2 / 6.690 2 / 6.824 - / - / 6.824 - / - 2 / 6.824 - / - - / 6.824 - / - / 0.000 - / 9.541 - / 9.755 / - - / 9.541 - / 9.755 / 6.690 - - 2 / 6.690 3 / 10.649 / 10.649 - - 3 / 10.649 / 10.649 - - 1 / 3.621 Continuing Continuing / 3.621 Continuing Continuing 1 / 3.621 Continuing Continuing / 3.621 Continuing Continuing Installation - / - - / - - / - - - - / 0.000 - / 15.224 - / 5.176 - / 231.365 / - - / 15.224 - / 5.176 - / 231.365 18.845 Continuing Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 368.141 4.465 0.000 6.690 0.000 UNCLASSIFIED Page 14 of 27 6.690 16.365 9.755 P-1 Line #109 10.649 Continuing Volume 4 - 112 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS MDAP/MAIS Code: Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN688 CLASS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2030 FY 2031 Contract Dates Jan 2027 Jan 2028 FY 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2028 Jul 2029 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 62 / 187.204 63 / 191.669 Prior Years 1 / 4.465 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 9.541 - / - - / - - / - 0 / 0.000 2 / 9.541 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 9.755 - / - - / - 0 / 0.000 2 / 9.755 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - 1 / 4.465 - / - - / - - / - - / - 2 / 9.541 2 / 9.755 - / - Total 62 / 187.204 3 / 15.224 / - - / - 0 / 0.000 3 / 15.224 / - 1 / 5.176 1 / 5.176 / - - 3 / 15.224 / - - 1 / 5.176 / - 71 / 231.365 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 62 - - - 1 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 71 Out 62 - - - 1 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 71 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 15 of 27 P-1 Line #109 Volume 4 - 113 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 161.663 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 161.663 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS 161.663 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 10.656 12.787 12.572 0.000 12.572 11.024 20.006 8.937 - - - - - - - - 10.656 12.787 12.572 0.000 12.572 11.024 20.006 8.937 - - - - - - - - 10.656 12.787 12.572 0.000 12.572 11.024 20.006 8.937 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 16 of 27 P-1 Line #109 Volume 4 - 114 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS Prior Years Financial Plan Modification Number / Title: 4 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS Related RDT&E PEs: 0604562N Modification Type: UPGRADE FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic Subtotal: Recurring Subtotal: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS Subtotal: Procurement, All Modification Items 21 / 122.223 - / - / 122.223 - / - 21 / 122.223 - / - / 122.223 - / - - - 3 / 12.787 - / - - / - - / - / 12.787 - / - - / - - / - 3 / 12.787 - / - - / - - / - / 12.787 - / - - / - - / - - - 2 / 11.024 / 11.024 - 2 / 11.024 / 11.024 - 2 / 11.244 - / - - / - Continuing Continuing / 11.244 - / - - / - Continuing Continuing 2 / 11.244 - / - - / - Continuing Continuing / 11.244 - / - - / - Continuing Continuing / 0.000 - / 0.000 - / 80.367 / - - / 0.000 - / 80.367 0.000 Continuing - - Installation Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS - / 39.440 - / 10.656 Subtotal: Installation - / 39.440 - / 10.656 - / 0.000 - / 12.572 / - - / 12.572 - / 0.000 - / 12.572 / - - / 12.572 - - / 0.000 - / 8.762 - / 8.937 / - - / 8.762 - / 8.937 - Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 161.663 10.656 12.787 12.572 0.000 UNCLASSIFIED Page 17 of 27 12.572 11.024 20.006 P-1 Line #109 8.937 Continuing Volume 4 - 115 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS MDAP/MAIS Code: Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jan 2026 Jan 2028 Jan 2029 Delivery Dates Jul 2027 Jul 2029 Jul 2030 FY 2030 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 18 / 39.440 3 / 10.656 21 / 50.096 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 3 / 12.572 - / - - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 8.762 - / - - / - 0 / 0.000 2 / 8.762 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 8.937 - / - 0 / 0.000 2 / 8.937 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 10.656 - / - 3 / 12.572 - / - 2 / 8.762 2 / 8.937 - / - 0 / 0.000 Total 18 / 39.440 3 / 12.572 0 / 0.000 3 / 12.572 0 / 0.000 / - - / - 3 / 12.572 / - - / - 28 / 80.367 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 18 - - - 3 - - - - - - - 3 - - - - - - - 2 - - - 2 - - - - - 28 Out 18 - - - 3 - - - - - - - 3 - - - - - - - 2 - - - 2 - - - - - 28 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 18 of 27 P-1 Line #109 Volume 4 - 116 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 5 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/ CWL MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 79.125 38.394 27.173 26.151 0.000 26.151 22.422 38.083 51.394 - - - - - - - - - 79.125 38.394 27.173 26.151 0.000 26.151 22.422 38.083 51.394 - - - - - - - - - 79.125 38.394 27.173 26.151 0.000 26.151 22.422 38.083 51.394 To FY 2031 Complete 74.934 Continuing - Continuing - 74.934 Continuing - Total - Continuing - - 74.934 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software and Common Weapon Launcher (CWL). SSN774 Class w/ CWL costs are greater than the costs for SSN774 Class (without CWL) due to the fact that CWL brings additional weapon launch interface hardware that allows AN/BYG-1 to communicate with the weapon launchers and the weapons. The CWL hardware requires additional ship alterations, installation procedures, installation verification procedures, cabling, and manpower. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 19 of 27 P-1 Line #109 Volume 4 - 117 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/ CWL MDAP/MAIS Code: Models of Systems Affected: VB034 UPGRADES Modification Type: UPGRADE FROM TI04 AND OUT BASELINE SSN774 CLASS W/ CWL Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic Subtotal: Recurring 7 / 61.606 - Subtotal: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL Subtotal: Procurement, All Modification Items / 61.606 3 / 25.191 - 7 / 61.606 1 / 9.886 / 25.191 - 3 / 25.191 / 9.886 1 / 9.886 - / - / 20.262 - / - 2 / 20.262 - / - / 20.262 - / - - / 61.606 - / 25.191 Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL - / 17.519 - / 13.203 - / 17.287 - / 5.889 Subtotal: Installation - / 17.519 - / 13.203 - / 17.287 - / 5.889 - / 9.886 2 / 20.262 - - 2 / 20.262 / 20.262 - 1 / 10.383 - 2 / 20.262 - / 10.383 3 / 31.930 1 / 10.383 / 20.262 - / 10.383 / 31.930 - 3 / 32.568 - 3 / 31.930 - / 32.568 - 3 / 32.568 5 / 55.637 Continuing Continuing / 55.637 Continuing Continuing 5 / 55.637 Continuing Continuing Continuing / 31.930 - / 32.568 - / 55.637 Continuing Installation - / 0.000 - / 5.889 - / 12.039 - / 6.153 - / 18.826 - / 19.297 - / 32.805 - / 143.018 / - - / 5.889 - / 12.039 - / 6.153 - / 18.826 - / 19.297 - / 32.805 - / 143.018 - Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 79.125 38.394 27.173 26.151 0.000 UNCLASSIFIED Page 20 of 27 26.151 22.422 38.083 P-1 Line #109 51.394 74.934 Continuing Continuing Volume 4 - 118 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/ CWL MDAP/MAIS Code: Modification Item 1 of 1: VB034 UPGRADES FROM TI04 AND OUT BASELINE SSN774 CLASS W/CWL Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 4 / 17.519 3 / 13.203 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 30.722 3 / 17.287 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 17.287 - / - - / - - / - - / - 0 / 0.000 1 / 5.889 2 / 12.039 - / - - / - - / - 0 / 0.000 2 / 12.039 - / - - / - 0 / 0.000 1 / 6.153 3 / 18.826 - / - 0 / 0.000 3 / 18.826 0 / 0.000 3 / 19.297 5 / 32.805 5 / 32.805 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - 1 / 5.889 0 / 0.000 1 / 5.889 FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 6.153 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 4 / 17.519 3 / 13.203 3 / 17.287 1 / 5.889 0 / 0.000 1 / 5.889 2 / 12.039 1 / 6.153 3 / 19.297 3 / 18.826 - 3 / 19.297 / - - 5 / 32.805 / - 25 / 143.018 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - - - 3 - - - 3 - - - 1 - - - 2 - - - 1 - - - 3 - - - 3 5 25 Out 4 - - - 3 - - - 3 - - - 1 - - - 2 - - - 1 - - - 3 - - - 3 5 25 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 21 of 27 P-1 Line #109 Volume 4 - 119 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 6 / VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 8.610 5.199 0.000 5.199 0.000 10.643 17.131 - - - - - - - - - 0.000 0.000 8.610 5.199 0.000 5.199 0.000 10.643 17.131 - - - - - - - - - 0.000 0.000 8.610 5.199 0.000 5.199 0.000 10.643 17.131 To FY 2031 Complete 17.559 Continuing - Continuing - 17.559 Continuing - Total - Continuing - - 17.559 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 22 of 27 P-1 Line #109 Volume 4 - 120 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS Prior Years Financial Plan Modification Number / Title: 6 / VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS Related RDT&E PEs: 0604562N Modification Type: UPGRADE FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic / - - / - / 0.000 - / - / - - / - - / 0.000 - / - Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS - / 0.000 / 0.000 Subtotal: Installation - / 0.000 Subtotal: Recurring - Subtotal: VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS Subtotal: Procurement, All Modification Items - 1 / 8.610 - / - - / - - / - - / - / 8.610 - / - - / - - / - - / - 1 / 8.610 - / - - / - - / - - / - - / 8.610 - / - - / - - / - - / - - / 0.000 - / 5.199 / - - / 5.199 - 1 / 10.643 / 10.643 - 1 / 10.856 1 / 10.643 / 10.643 - / 10.856 - 1 / 10.856 / 10.856 - 1 / 11.127 Continuing Continuing / 11.127 Continuing Continuing 1 / 11.127 Continuing Continuing / 11.127 Continuing Continuing - - Installation - - / - - - / 0.000 - / 5.199 / - - / 5.199 - - / 0.000 - / - - - / 0.000 - / 6.275 - / 6.432 - / 6.561 - / 24.467 / - - / 6.275 - / 6.432 - / 6.561 - / 24.467 17.559 Continuing Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 0.000 0.000 8.610 5.199 0.000 UNCLASSIFIED Page 23 of 27 5.199 0.000 10.643 P-1 Line #109 17.131 Continuing Volume 4 - 121 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS MDAP/MAIS Code: Modification Item 1 of 1: VB034 SSBN MODERNIZATION TECH INSERTION COLUMBIA CLASS Manufacturer Information Manufacturer Name: Various Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2026 FY 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2027 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 1 / 5.199 0 / 0.000 1 / 5.199 - / - - / - - / - - / - 0 / 0.000 1 / 5.199 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.275 - / - 0 / 0.000 1 / 6.275 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.432 0 / 0.000 1 / 6.432 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.561 1 / 6.561 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - 1 / 5.199 1 / 5.199 - / - - / - 1 / 6.275 Installation Cost 0 / 0.000 1 / 6.432 / - - 1 / 6.561 / - 4 / 24.467 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - 1 - - - - - - - - - - - 1 - - - 1 1 4 Out - - - - - - - - - - - - 1 - - - - - - - - - - - 1 - - - 1 1 4 LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 24 of 27 P-1 Line #109 Volume 4 - 122 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 7 / VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 8.397 5.762 30.630 0.000 30.630 49.229 50.415 51.491 - - - - - - - - - 0.000 8.397 5.762 30.630 0.000 30.630 49.229 50.415 51.491 - - - - - - - - - 0.000 8.397 5.762 30.630 0.000 30.630 49.229 50.415 51.491 To FY 2031 Complete 52.592 Continuing - Continuing - 52.592 Continuing - Total - Continuing - - 52.592 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program will provide submarine combat control systems with COTS-based upgrades to combat control and tactical control hardware and software. SSN 774 BLK V w/CWL installations costs during a PSA are greater due to increased costs incurred for shipyard services, additional industrial work scheduling and installation efforts, increased installation verification efforts, and additional certification workload. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 25 of 27 P-1 Line #109 Volume 4 - 123 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL MDAP/MAIS Code: Models of Systems Affected: VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL Prior Years Related RDT&E PEs: 0604562N Modification Type: UPGRADE FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL B Kits Recurring 1.1.1) EQUIPMENT - NonOrganic - (10) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 0.000 - Subtotal: VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL / - - 1 / 8.397 - / - / 8.397 - / - 1 / 8.397 - / - - / - - / - - / 0.000 - / 8.397 Modification Item 1 of 1: VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL - / 0.000 - / 0.000 - / 5.762 Subtotal: Installation - / 0.000 / - - / 5.762 2 / 30.630 - / - / 30.630 - / - 2 / 30.630 - / - / 30.630 - / - - - 2 / 30.630 / 30.630 - 2 / 31.394 - 2 / 30.630 - / 31.394 2 / 32.179 - 2 / 31.394 / 32.179 2 / 32.877 - 2 / 32.179 / 32.877 - 2 / 32.877 2 / 33.591 Continuing Continuing / 33.591 Continuing Continuing 2 / 33.591 Continuing Continuing / 30.630 - / 31.394 - / 32.179 - / 32.877 - / 33.591 Continuing Continuing / 0.000 - / 17.835 - / 18.236 - / 18.614 - / 19.001 - / 19.381 - / 98.829 / - - / 17.835 - / 18.236 - / 18.614 - / 19.001 - / 19.381 - / 98.829 Installation - - / 0.000 - / - - / 0.000 / - - - Total Total Cost (Procurement + Support + Installation) LI 5420 - SSN Combat Control Systems Navy 0.000 8.397 5.762 30.630 0.000 UNCLASSIFIED Page 26 of 27 30.630 49.229 50.415 P-1 Line #109 51.491 52.592 Continuing Continuing Volume 4 - 124 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5420 / SSN Combat Control Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL MDAP/MAIS Code: Modification Item 1 of 1: VB034 SSN774 BLK V AND OUT W/ CWL TECH INSERT- PSA INSTALL Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Jan 2025 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jul 2026 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: EQUIPMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 5.762 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 17.835 - / - - / - - / - 0 / 0.000 2 / 17.835 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 18.236 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 18.614 - / - 0 / 0.000 2 / 18.614 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 19.001 0 / 0.000 2 / 19.001 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 19.381 2 / 19.381 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 5.762 - / - - / - - / - Installation Cost 2 / 18.236 2 / 17.835 2 / 18.236 2 / 18.614 - 2 / 19.001 / - - / - 1 / 5.762 / - - / - / - - 2 / 19.381 / - 11 / 98.829 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 1 - - - - - - - 2 - - - 2 - - - 2 - - - 2 2 11 Out - - - - - - - - 1 - - - - - - - 2 - - - 2 - - - 2 - - - 2 2 11 Footnotes: (10) FY 2027 funding increased for VB034 SSN 774 Blk V and Out with CWL Tech Insert - PSA due to the increase in procurements from 0 in FY26 to 2 in FY27. Unit cost and installation cost increases are to account for the second CWL on the VPM hulls. LI 5420 - SSN Combat Control Systems Navy UNCLASSIFIED Page 27 of 27 P-1 Line #109 Volume 4 - 125 === page 202 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 126 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5429 / ASW Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 256.528 256.528 256.528 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 25.362 25.721 25.105 0.000 25.105 27.150 27.631 28.157 - - - - - - - - 25.362 25.721 25.105 0.000 25.105 27.150 27.631 28.157 - - - - - - - - 25.362 25.721 25.105 0.000 25.105 27.150 27.631 28.157 To FY 2031 Complete 28.713 Continuing - Continuing - 28.713 Continuing - Total - Continuing - - 28.713 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This Budget Line Item (BLI) consists of three separate and distinct programs, the Submarine Weapons Launching and Handling Support Equipment program, the Surface ASW Support Equipment program, and the ASW Range Support Equipment program. SUBMARINE WEAPONS LAUNCHING AND HANDLING SUPPORT EQUIPMENT (Cost Codes VC000/VC830/VC5IN): Funding for modifications and improvements to SSN 688, SSBN 726 and SSN 21 classes Attack and Ballistic Missile Submarine weapons launching, stowage and shipping systems, torpedo tube system components and torpedo tube test equipment. These requirements arise as a result of the introduction of new or modified weapons, devices, and sensors and their subsequent evaluation test and operational use. Also procured are reliability, maintainability, functional and safety modifications and tactical improvements resulting from operational use experience. This funding also provides management services required for installations. SURFACE ASW SUPPORT EQUIPMENT (Cost Codes VC008/VC009/VC900/VC6IN/VC010): Funding provides for the procurement and fielding of safety modifications through the Ordnance Alteration (ORDALT) process to Anti-Submarine Warfare (ASW) Fire Control, Surface Vessel Torpedo Tube (SVTT), and related ASW Fire Control/SVTT support and test equipment to maintain the current performance envelope. ORDALT procurements are highly variable and dependent on shipboard configurations and equipment age. Included in this line item are all related procurements for training and simulation equipment required for the continued operation of this equipment. Modification requirements arise based on Reliability, Maintainability and Availability (RM&A) metrics and as a result of evaluation, testing, and Fleet use of existing, new, or modified ASW weapons and/or related systems and subsystems. Funding also provides for the upgrade of a major subsystem of the SVTT, the MK 432 Test Set Torpedo Presetter (TSTP), which provides the Fleet the capability to simulate presetting, mode, and launch verification by emulating all surface lightweight torpedo types and is also employed as an enhanced troubleshooting tool during launcher, Undersea Warfare (USW) Fire Control, and system casualty events. Funding also provides for the fielding of the next generation AN/UQN-10 Sonar Sounding Set Fathometer as a Commercial-Off-TheShelf (COTS) retrofit/replacement of legacy AN/UQN-4/4A systems on Destroyer (DDG51 Class), Aircraft Carrier (CVN Class), and Amphibious (LHA, LHD, LPD, LSD, LCC) platforms, and also the non-recurring engineering (NRE) effort required to upgrade acoustic communications and convert non-program of record fathometers and transducers employed on Littoral Combat Ship (LCS) and DDG1000 platforms to the common program of record AN/UQN-10 Sonar Sounding Set Fathometer and TR-355 transducer. ASW RANGE SUPPORT EQUIPMENT (Cost Codes VC001/VC002/VC003/VC004/VC005/VC831/VC832/VC851/VC970): ASW range support equipment includes self-propelled surface targets, towed surface targets, and associated target augmentation to mimic threats and/or provide feedback. Self-propelled surface targets include the High-Speed Maneuverable Surface Target (HSMST), High-Speed Maneuverable Surface Target - Streamline (HSMST-s), Seaborne Powered Target (SEPTAR) and Fast Attack Craft Target (FACT). Towed surface targets include the Low-Cost Modular Target (LCMT) and Polyethylene Tow Target (PETT). Funding is also for the procurement of underwater tracking and shore equipment, Test and Evaluation (T&E), acoustic trial range equipment, and weapon system and test equipment. Equipment procured includes instrumentation for U.S. Fleet Operational Readiness Accuracy Check Sites (FORACS) Program, equipment required to conduct fleet exercises at fixed and portable ranges for the Underwater LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 1 of 14 P-1 Line #110 Volume 4 - 127 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5429 / ASW Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Tracking Range Equipment (UTRE)/Pinger Program, and equipment for the Surface Ship Radiated Noise Measurement (SSRNM) Program. Training and T&E ranges include Southern California Offshore Range (SCORE), Barking Sands Tactical Underwater Range/Barking Sands Underwater Range Extension (BARSTUR/BSURE), Jacksonville Shallow Water Training Range (JSWTR), Atlantic Underwater Test and Evaluation Center (AUTEC), Pacific Northwest Range Complex (Dabob/Nanoose ranges operated by Naval Undersea Warfare Center Division Keyport, Washington). Undersea Tracking Range Equipment includes MK 84 pingers used for participant tracking on instrumented ranges. FORACS ranges include AUTEC, San Clemente Island, California, and deployed portable testing. Funding lines associated with replenishment spares N96 JCR6C ASW Support Equipment - SSRNM (J5429) for the FORACS and SSRNM programs and N94 JCR6C ASW Support Equipment (J5429) for the UTRE program. See the following for a description of all P-40a and P-3a cost items that comprise this budget: [P40A / VC000 - SUB WEAPONS LAUNCH/HANDLING SUPPORT]: VC000 - SUB WEAPONS LAUNCH/HANDLING SUPPORT The Submarine Torpedo Tube Support category funds in-service support and alteration procurements for all submarine Torpedo Tubes (TT), Torpedo Ejection Pumps (TEP), Internal Countermeasure Launchers (ICL), and Weapons Stowage and Handling Systems (WSHS). Development efforts under this item number include Engineering Change Proposals (ECP), ORDALTs, Type Zero (TZ) kits and Test Equipment and alteration material procurement to correct significant deficiencies in equipment affecting personnel safety, ship safety and system performance. [P40A / VC830 - PRODUCTION ENGINEERING]: VC830 - PRODUCTION ENGINEERING Production engineering includes resolving Liaison Action Requests (LARs) configure/test assembly in lab prior to ship installation and in-shop engineering support of vendor testing. [P40A / VC5IN O/A INSTALLATION]: VC5IN O/A 18000 INSTALL Installing agents will be various Naval Shipyards and contractors. Contracted installations require funding for management of installations during the availabilities. All installations will be on SSBN and SSN688/21 Class Submarines. [P40A - 2 / SURFACE ASW SUPPORT EQUIPMENT]: Cost Codes VC008/VC009/VC900/VC6IN: [P40A - 2 / VC008 - ASWCS FIRE CONTROL ORDALTS]: VC008 Cost Elements/Descriptions as follows: ASWCS - UCFS/FIRE CONTROL ORDALTs Item Number 1.1: Provides funding for ORDALT kits for the ASW Underwater Control Functional Segment (UCFS), ASW Control System (ASWCS) MK116 Mod 7, Torpedo Setting Panel (MK331), and the Torpedo Pre-Setter Test Set (MK432). This line item also provides material support at multiple land-based laboratories as well as material support for upgrades and calibrations. Procurements will ensure laboratories are at Fleet baseline configurations. ASWCS - PRODUCTION ENGINEERING SUPPORT Item Number 1.2: Provides the necessary production engineering support funds to cover the associated Integrated Logistics Support (ILS) elements, Engineering Change Proposal (ECP) reviews, Engineering Changes (EC), Ship Change Documents (SCDs), and engineering audits for ASW Fire Control. Reviews and approves internal and external system interfaces (hardware and integration related) and identify interface issues. ASWCS - ACCEPTANCE TEST & EVALUATION Item Number 1.3: Provides the in-house acceptance test and evaluation funding associated with the safety and quality assurance testing of all ASW Fire Control, Alteration Equivalent to Repairs (AERs), ECPs, ECs, and SCDs. [P40A - 2 / VC009 - TORPEDO TUBE ORDALTS]: VC009 Cost Elements/Descriptions as follows: SVTT - MK32 ORDALTS Item Number 2.1: The SVTT MK32 is an over-the-side torpedo defense surface ship launched system that conducts close-in ASW operations. This line provides funding for SVTT MK32 launchers, Torpedo Loading Trays (TLTs), and ancillary equipment for testing, training, and maintainability on select surface ship combatants. ORDALT procurements include: Overheat Sensor Test Set (SVTT MK32 Mod 15 Only - ORDALT 91074); Breech Mechanism Control Valve Redesign (SVTT MK32 All Mods - ORDALT ECP 2061); Training Gear Handcrank Support Improvements (SVTT MK32 Mods 15 Only ORDALT ECP 2060), and Air Charging Panel Enclosure Redesign (SVTT MK32 MOD 15 Only - ORDALT ECP TBD). Procure SVTT shoresite laboratory equipment for Launcher System Facilities (LSF). LSFs LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 2 of 14 P-1 Line #110 Volume 4 - 128 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5429 / ASW Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A are used to simulate shipboard conditions for over-the-side torpedo launchers, as well as for the creation of the required ORDALTs. This line item will also upgrade a major subsystem of the SVTT, the MK 432 Test Set Torpedo Presetter (TSTP). Note: The MK 432 TSTP provides the Fleet the capability to simulate presetting, mode, and launch verification by emulating all surface lightweight torpedo types and is also employed as an enhanced troubleshooting tool during launcher, Undersea Warfare (USW) Fire Control, and system casualty events. Due to obsolescence issues with the MK 432 TSTP, including display, mechanical steppers, and insufficient Random Access Memory (RAM) for presets, and as driven by enhanced Digital Fire Control Interface (eDFCI) requirements associated with AN/SQQ-89A(V)15 Surface ASW Combat System Advanced Capability Build (ACB) production baselines to ensure continued interoperability between the two systems, the MK 432 TSTP is undergoing a significant ORDALT effort. Goals of the redesigned MK 432 TSTP equipment include upgrade of the microcontroller to have sufficient RAM for eDFCI presets, emulation of Mk 54 Mod 0/1/2 torpedoes, utilization of current Mk 54 circuitry for analog emulation instead of mechanical steppers, migration away from assembly language, and emulation of Recoverable Exercise Torpedoes (REXTORPs) and Exercise Torpedoes (EXTORPs). SVTT - PRODUCTION ENGINEERING Item Number 2.2: Provides the necessary production engineering support funds to cover the associated Integrated Logistics Support (ILS) elements, Engineering Change Proposal (ECP) reviews, Engineering Changes (EC), SCDs, and engineering audits for SVTT ORDALTs. SVTT - ACCEPTANCE TEST & EVALUATION Item Number 2.3: Provides the in-house acceptance test and evaluation funding required for the safety and quality assurance testing of all SVTT ORDALTs, Alteration Equivalent to Repairs (AERs), ECPs, ECs, and SCDs. [P40A - 2 / VC900 - CONSULTING SERVICES]: VC900 Cost Element/Description as Follows: Item 3.1: Provides the necessary funding for consulting services required to support scheduling of ASW Fire Control and SVTT ORDALT production, test, and installation efforts in conjunction with operation, safety, and environmental requirements. [P40A - 2 / VC6IN - INSTALLATION OF EQUIPMENT]: VC6IN Cost Element/Description as follows: Item Numbers 4.1 & 4.2: Funds the installation of all ASW UCFS/Fire Control ORDALTs/SCDs (under Cost Code VC008) and SVTT ORDALTs/SCDs (under Cost Code VC009). Alteration Installation Team (AIT) pier-side installations are variable and contingent on Type Commander (TYCOM), Ships' Scheduling Conference (SSC), and ships' availability. [P40A - 3 / ASW RANGE SUPPORT EQUIPMENT]: ANTI-SUBMARINE WARFARE (ASW) RANGE SUPPORT EQUIPMENT: Funding for self-propelled surface targets, towed surface targets, and associated target augmentation to mimic threats and/or provide feedback. Self-propelled surface targets include the High-Speed Maneuverable Surface Target (HSMST), Seaborne Powered Target (SEPTAR) and Fast Attack Craft Target (FACT). Towed surface targets include the Low-Cost Modular Target (LCMT) and Polyethylene Tow Target (PETT). (Targets) Funding also provides Surface Ship Radiated Noise Measurement (SSRNM) & US Fleet Operational Readiness Accuracy Check Sites (FORACS) test and evaluation capability for surface ships and submarines; Underwater Tracking Range Equipment (UTRE)/Pinger Program provides tracking equipment for systems, platforms, torpedoes and targets on all Navy Underwater Tracking Ranges, including portable tracking systems supporting test and training events. (S05) [P40A - 3 / VC001 - Surface Ship Radiated Noise Measurement (SSRNM)/US Fleet Operational Readiness Accuracy Check Sites (FORACS) - N96]: Funding provides for the procurement of range communication systems, ship auto-tracking system, Surface Ship Acoustic Range Equipment, and upgraded ship position tracking system for the Surface Ship Radiated Noise Measurement (SSRNM) and US Fleet Operational Readiness Accuracy Check Sites (FORACS) programs. Funding also provides for improvements, modernizations, and upgrades to systems and equipment. (S05) [P40A - 3 / VC002 - UNDERWATER TRACKING RANGE EQUIPMENT (UTRE)/Pinger - N94]: Funding provides for the Underwater Tracking Range Equipment (UTRE)/Pinger program for the procurement of underwater tracking equipment for fixed and portable tracking systems, both CONUS and OCONUS, shop special Pinger purpose test equipment, and the associated ancillary hardware required to track LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 3 of 14 P-1 Line #110 Volume 4 - 129 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5429 / ASW Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A ships and submarines during Fleet training exercises. Funding provides tracking equipment for systems, platforms, torpedoes and targets on all Navy Underwater Tracking Ranges, including portable tracking systems supporting test and training events for Forward Deployed Naval Forces (FDNF). Funding also provides for improvements, modernizations, and upgrades to systems and equipment through Production Engineering and Product Improvement performed by a field activity or contractor during the production phase of these projects. (S05) [P40A - 3 / VC003 - TOWED TARGETS]: The Fleet requires low cost expendable towed targets for weapon system T&E and Fleet training. The Low Cost Modular Target (LCMT) and the Polyethylene Tow Target (PETT) are the primary towed targets used to meet these requirements. [P40A - 3 / VC004 - INSTRUMENTATION]: Seaborne target augmentation systems include transponders (i.e. transmitters/receivers), radar reflectors, Radio Frequency (RF) emitters and Ground Support Equipment (GSE). Various electronic components provide the interface for the target control systems with the control stations/facilities for drone operations. RF emitters and radar reflectors enhance target threat replication and provide the required stimulus for anti-surface/radar weapons systems. [P40A - 3 / VC005 - HSMST (HIGH SPEED MANEUVERABLE SURFACE TARGET)]: Provides the user with a medium to high speed remote controlled surface target with a high degree of maneuverability. It has a form fitted collar surrounding the deck area of the aluminum hull. This target can exceed 45 knots in a calm sea and approaches 40 knots in a sea state 3. [P40A - 3 / VC831/2 - PRODUCTION ENGINEERING]: Funding provides for Production Engineering performed by a field activity or contractor during the production phase of these projects. (S05) & (Ships) S05 Product engineering requirements have been realigned to Cost Code VC002 - UNDERWATER TRACKING RANGE EQUIPMENT (UTRE)/Pinger. [P40A - 3 / VC851 - PRODUCT IMPROVEMENT]: Funding provides for Product Improvement performed by a field activity or contractor during the production phase of these projects. Product improvement requirements have been realigned to Cost Code VC002 - UNDERWATER TRACKING RANGE EQUIPMENT (UTRE)/Pinger. (S05) [P40A - 3 / VC970 - INTEGRATED LOGISTICS SUPPORT]: Funding provides for logistics spares and repair parts. [P3A / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER]: Funding provides for the fielding of the next generation AN/UQN-10 Sonar Sounding Set Fathometer as a Commercial-Off-The-Shelf (COTS) retrofit/replacement of legacy AN/UQN-4/4A systems on Destroyer (DDG51 Class), Aircraft Carrier (CVN Class), and Amphibious (LHA, LHD, LPD, LSD, LCC) platforms. This program will also finance the non-recurring engineering (NRE) required to upgrade acoustic communications and convert the non-program of record fathometers and transducers employed on Littoral Combat Ship (LCS) and DDG1000 platforms to the common program of record AN/UQN-10 Sonar Sounding Set Fathometer and TR-355 transducer. Retrofit of legacy AN/UQN-4/4A systems is required to increase Reliability, Maintainability & Availability (RM&A) metrics, increase overall Sonar Sounding Set Fathometer system Operational Availability (Ao), eliminate obsolescence issues and reduce supportability costs. AN/UQN-10 Sonar Sounding Set Fathometer replacement/retrofit efforts include the establishment of Integrated Logistics Support (ILS) elements and engineering test procedures, qualification and acceptance testing, procurement, and installation of systems via Alteration Installation Team (AIT). The AN/UQN-10 provides a means of measuring the depth of water below the ships keel to the ocean bottom. The AN/UQN-10 performs depth sounding functions, while providing visual depth indication and recording capabilities, for measured water depths to a maximum depth of more than 7000 meters. Real-time depth information is displayed in digital readout and graphic display formats with internal depth data logging capability available for playback and use in reconstruction efforts. The AN/UQN-10 is a drop-in replacement of the legacy AN/UQN-4/4A system, designed specifically to communicate with the same shipboard system interfaces and to utilize the same TR-355 series transducer as the legacy AN/UQN-4/4A. The AN/UQN-10 employs touch screen control, new digital remote depth indicators, and a new EchoSim signal simulator. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 4 of 14 P-1 Line #110 Volume 4 - 130 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 5: ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5429 / ASW Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SUB WEAPONS LAUNCHING/HANDLING SUPPORT EQUIPMENT - / 20.303 / - - / - P-40a SURFACE ASW SUPPORT EQUIPMENT - / 40.786 - / 5.664 - / 5.773 - / 6.192 - / - - / 6.192 P-40a ASW RANGE SUPPORT EQUIPMENT - / 180.473 - / 18.095 - / 18.317 - / 18.199 - / - - / 18.199 P-3a 1 / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER (Warfighting Capability) - / 14.966 - / 1.603 - / 1.631 - / 0.714 - / 0.000 - / 0.714 P-40 Total Gross/Weapon System Cost - / 256.528 - / 25.362 - / 25.721 - / 25.105 - / 0.000 - / 25.105 P-5a Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - / - - - / - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SUB WEAPONS LAUNCHING/HANDLING SUPPORT EQUIPMENT - / - - / - - / - - / - - / - - / - P-40a SURFACE ASW SUPPORT EQUIPMENT - / - - / - - / - - / - - / - - / - P-40a ASW RANGE SUPPORT EQUIPMENT - / - - / - - / - - / - - / - - / - P-3a 1 / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER (Warfighting Capability) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 27.150 - / 27.631 - / 28.157 - / 28.713 Continuing P-5a / 0.000 - / 18.914 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 5 of 14 P-1 Line #110 Volume 4 - 131 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Aggregated Items Title: SUB WEAPONS LAUNCHING/ HANDLING SUPPORT EQUIPMENT Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) VC000 - SUB WEAPONS LAUNCH/HANDLING SUPPORT 1.1) 2J COG MATERIAL A 1.2) TT/TEP/ICL/ WSHS A - - 0.678 - - - - - - - - - - - - - - - - - 6.284 - - - - - - - - - - - - - - - - - 6.962 - - - - - - - - - - - - - - - 26 1.300 - - - - - - - - - - - - - - - - - 1.300 - - - - - - - - - - - - - - - - - 0.131 - - - - - - - - - - - - - - - - - 0.573 - - - - - - - - - - - - - - - - - 0.637 - - - - - - - - - - - - - - - - - 1.341 - - - - - - - - - - - - - - - - - 1.200 - - - - - - - - - - - - - - - - - 1.200 - - - - - - - - - - - - - - - - - 9.500 - - - - - - - - - - - - - - - Subtotal: 5) VC5IN - ORDALT INSTALLATION - - 9.500 - - - - - - - - - - - - - - - Total - - 20.303 - - - - - - - - - - - - - - - Subtotal: 1) VC000 - SUB WEAPONS LAUNCH/HANDLING SUPPORT 2) VC000 ORDALT PROCUREMENT 2.1) O/A MATERIAL A Subtotal: 2) VC000 ORDALT PROCUREMENT 50,000.00 3) VC000 - TEST EQUIPMENT 3.1) BORE GAGE A 3.2) MISC. TEST EQUIPMENT A 3.3) TEST FACILITY EQUIPMENT A Subtotal: 3) VC000 - TEST EQUIPMENT 4) VC830 - PRODUCTION ENGINEERING 4.1) PRODUCTION ENGINEERING A Subtotal: 4) VC830 - PRODUCTION ENGINEERING 5) VC5IN - ORDALT INSTALLATION 5.1) VC5IN O/A INSTALLATION A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) This line item procures modifications and improvements to Attack and Ballistic Missile Submarine fire control interface systems, torpedo tube system components and torpedo tube test equipment. These requirements arise as a result of the introduction of new or modified weapons and sensors and their subsequent evaluation test and operational use. Also procured are reliability, maintainability, functional and safety modifications and tactical improvements resulting from operational use experience. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 6 of 14 P-1 Line #110 Volume 4 - 132 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: SURFACE ASW SUPPORT EQUIPMENT FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) VC008 - ASWCS FIRE CONTROL ORDALTS 1.1) ASWCS - UCFS/ FIRE CONTROL ORDALTS - - 17.237 - - 1.884 - - 1.922 - - 1.960 - - - - - 1.960 1.2) ASWCS PRODUCTION ENGINEERING SUPPORT - - 0.938 - - 0.105 - - 0.107 - - 0.109 - - - - - 0.109 1.3) ASWCS ACCEPTANCE TEST & EVALUATION - - 0.528 - - 0.058 - - 0.059 - - 0.060 - - - - - 0.060 - - 18.703 - - 2.047 - - 2.088 - - 2.129 - - - - - 2.129 - - 17.482 - - 3.116 - - 3.175 - - 3.544 - - - - - 3.544 2.2) SVTT PRODUCTION ENGINEERING SUPPORT - - 0.934 - - 0.105 - - 0.107 - - 0.109 - - - - - 0.109 2.3) SVTT ACCEPTANCE TEST & EVALUATION - - 0.528 - - 0.058 - - 0.059 - - 0.060 - - - - - 0.060 - - 18.944 - - 3.279 - - 3.341 - - 3.713 - - - - - 3.713 - - 0.969 - - 0.102 - - 0.104 - - 0.106 - - - - - 0.106 - - 0.969 - - 0.102 - - 0.104 - - 0.106 - - - - - 0.106 4.1) ASWCS - UCFS/ FIRE CONTROL ORDALTS - - 1.099 - - 0.118 - - 0.120 - - 0.122 - - - - - 0.122 4.2) SVTT TORPEDO TUBE ORDALTS - - 1.071 - - 0.118 - - 0.120 - - 0.122 - - - - - 0.122 Subtotal: 4) VC6IN - INSTALLATION OF EQUIPMENT - - 2.170 - - 0.236 - - 0.240 - - 0.244 - - - - - 0.244 Total - - 40.786 - - 5.664 - - 5.773 - - 6.192 - - - - - 6.192 Subtotal: 1) VC008 - ASWCS FIRE CONTROL ORDALTS 2) VC009 - TORPEDO TUBE ORDALTS 2.1) SVTT - MK32 ORDALTS (2) Subtotal: 2) VC009 - TORPEDO TUBE ORDALTS 3) VC900 - CONSULTING SERVICES 3.1) CONSULTING SERVICES Subtotal: 3) VC900 - CONSULTING SERVICES 4) VC6IN - INSTALLATION OF EQUIPMENT Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 7 of 14 P-1 Line #110 Volume 4 - 133 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5429 / ASW Support Equipment Aggregated Items Title: SURFACE ASW SUPPORT EQUIPMENT (2) Item Number 2.1 - SVTT MK32 ORDALTs: The FY 2026 ($3.175M) to FY 2027 ($3.544M) increase represents the additional funding required in FY 2027 to support the upgrade of a major subsystem of the SVTT, the MK 432 Test Set Torpedo Presetter (TSTP). The MK 432 TSTP provides the Fleet the capability to simulate presetting, mode, and launch verification by emulating all surface lightweight torpedo types and is also employed as an enhanced troubleshooting tool during launcher, Undersea Warfare (USW) Fire Control, and system casualty events. Due to obsolescence issues with the MK 432 TSTP, including display, mechanical steppers, and insufficient Random Access Memory (RAM) for presets, and as driven by enhanced Digital Fire Control Interface (eDFCI) requirements associated with AN/SQQ-89A(V)15 Surface ASW Combat System Advanced Capability Build (ACB) production baselines to ensure continued interoperability between the two systems, the MK 432 TSTP is undergoing a significant ORDALT effort. Goals of the redesigned MK 432 TSTP equipment include upgrade of the microcontroller to have sufficient RAM for eDFCI presets, emulation of Mk 54 Mod 0/1/2 torpedoes, utilization of current Mk 54 circuitry for analog emulation instead of mechanical steppers, migration away from assembly language, and emulation of Recoverable Exercise Torpedoes (REXTORPs) and Exercise Torpedoes (EXTORPs). LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 8 of 14 P-1 Line #110 Volume 4 - 134 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: ASW RANGE SUPPORT EQUIPMENT Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) VC001 - Surface Ship Radiated Noise Measurement (SSRNM)/US Fleet Operational Readiness Acc 1.1) VC001 - SSRNM/ US FORACS (S05) A Subtotal: 1) VC001 - Surface Ship Radiated Noise Measurement (SSRNM)/US Fleet Operational Readiness Acc - - 26.883 - - 3.181 - - 3.241 - - 3.024 - - - - - 3.024 - - 26.883 - - 3.181 - - 3.241 - - 3.024 - - - - - 3.024 2) VC002 - UNDERWATER TRACKING RANGE EQUIPMENT (UTRE)/Pinger - N94 2.1) VC002 - UTRE (S05) A Subtotal: 2) VC002 - UNDERWATER TRACKING RANGE EQUIPMENT (UTRE)/Pinger - N94 - - 38.260 - - 2.817 - - 2.647 - - 2.469 - - - - - 2.469 - - 38.260 - - 2.817 - - 2.647 - - 2.469 - - - - - 2.469 - - 10.061 - - 1.064 - - 1.098 - - 1.709 - - - - - 1.709 - - 10.061 - - 1.064 - - 1.098 - - 1.709 - - - - - 1.709 - - 1.705 - - 0.200 - - 0.201 - - 0.201 - - - - - 0.201 - - 1.705 - - 0.200 - - 0.201 - - 0.201 - - - - - 0.201 45 10.063 3) VC003 - TOWED TARGETS 3.1) VC003 - TOWED TARGETS (USC) A Subtotal: 3) VC003 - TOWED TARGETS 4) VC004 - INSTRUMENTATION 4.1) VC004 INSTRUMENTATION (USC) A Subtotal: 4) VC004 INSTRUMENTATION 5) VC005 - HSMST (HIGH SPEED MANEUVERABLE SURFACE TARGET) 5.1) VC005 - HSMST (USC) (3)(†) A 201,448.89 Subtotal: 5) VC005 - HSMST (HIGH SPEED MANEUVERABLE SURFACE TARGET) 450 90.652 224,444.44 45 10.100 231,044.44 45 10.397 223,622.22 45 10.063 - - - 223,622.22 - - 90.652 - - 10.100 - - 10.397 - - 10.063 - - - - - 10.063 - - 3.349 - - - - - - - - - - - - - - - - - 4.704 - - 0.537 - - 0.533 - - 0.533 - - - - - 0.533 - - 8.053 - - 0.537 - - 0.533 - - 0.533 - - - - - 0.533 - - 3.350 - - - - - - - - - - - - - - - 6) VC831/2 - PRODUCTION ENGINEERING 6.1) VC831 PRODUCTION ENGINEERING UTRE - N94/US FORACS N96 (S05) A 6.2) VC832 PRODUCTION ENGINEERING (USC) A Subtotal: 6) VC831/2 - PRODUCTION ENGINEERING 7) VC851 - PRODUCT IMPROVEMENT 7.1) VC851 - PRODUCT A LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 9 of 14 P-1 Line #110 Volume 4 - 135 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Prior Years MDAP/ Item Number / Title [DODIC] IMPROVEMENT UTRE - N94/US FORACS-N96 (S05) ID CD MAIS Code Unit Cost ($) Subtotal: 7) VC851 - PRODUCT IMPROVEMENT Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: ASW RANGE SUPPORT EQUIPMENT FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 3.350 - - - - - - - - - - - - - - - - - 1.509 - - 0.196 - - 0.200 - - 0.200 - - - - - 0.200 Subtotal: 8) VC970 - INTEGRATED LOGISTICS SUPPORT - - 1.509 - - 0.196 - - 0.200 - - 0.200 - - - - - 0.200 Total - - 180.473 - - 18.095 - - 18.317 - - 18.199 - - - - - 18.199 8) VC970 - INTEGRATED LOGISTICS SUPPORT 8.1) VC970 INTEGRATED LOGISTICS SUPPORT (USC) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (3) HSMSTs, including the associated boat accessories, trailers and spare parts, must be procured annually to (1) replace targets destroyed during testing/exercises, (2) replace targets which are beyond their service life and (3) provide a sufficient inventory of targets at the operating activities (Target Ranges). The Navy conducts approximately 3,000 seaborne target exercises each year. 1,500 seaborne target operations each year involve the HSMST and between 50 and 100 are destroyed annually. HSMSTs can be re-used if the target is not impacted or if the extent of the damage is minimal enough to allow the HSMST to be repaired. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 10 of 14 P-1 Line #110 Volume 4 - 136 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 5429 / ASW Support Equipment Method/Type or Funding Vehicle Aggregated Items: ASW RANGE SUPPORT EQUIPMENT Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 5) VC005 - HSMST (HIGH SPEED MANEUVERABLE SURFACE TARGET) 5.1) VC005 - HSMST (USC) (3) 2025 Silverships / Theodore, AL C / FFP NAVSEA Mar 2025 Aug 2025 45 224,444.44 Y Nov 2024 5.1) VC005 - HSMST (USC) (3) 2026 Silverships / Theodore, AL C / FFP NAVSEA Mar 2026 Aug 2026 45 231,044.44 Y Nov 2025 5.1) VC005 - HSMST (USC) (3) 2027 Silverships / Theodore, AL C / TBD NAVSEA Mar 2027 Aug 2027 45 223,622.22 Y Nov 2026 LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 11 of 14 P-1 Line #110 Volume 4 - 137 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 P-1 Line Item Number / Title: 5429 / ASW Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 14.966 1.603 1.631 0.714 0.000 0.714 0.000 0.000 0.000 0.000 0.000 18.914 Total - - - - - - - - - - - - 14.966 1.603 1.631 0.714 0.000 0.714 0.000 0.000 0.000 0.000 0.000 18.914 - - - - - - - - - - - - 14.966 1.603 1.631 0.714 0.000 0.714 0.000 0.000 0.000 0.000 0.000 18.914 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line item is responsible for the fielding of the next generation AN/UQN-10 Sonar Sounding Set Fathometer as a Commercial-Off-The-Shelf (COTS) retrofit/replacement of legacy AN/UQN-4/4A systems on Destroyer (DDG51 Class), Aircraft Carrier (CVN Class), and Amphibious (LHA, LHD, LPD, LSD, LCC) platforms. This program will also finance the non-recurring engineering (NRE) required to upgrade acoustic communications and convert the non-program of record fathometers and transducers employed on Littoral Combat Ship (LCS) and DDG1000 platforms to the common program of record AN/UQN-10 Sonar Sounding Set Fathometer and TR-355 transducer. Retrofit of legacy AN/UQN-4/4A systems is required to increase Reliability, Maintainability & Availability (RM&A) metrics, increase overall Sonar Sounding Set Fathometer system Operational Availability (Ao), eliminate obsolescence issues and reduce supportability costs. AN/UQN-10 Sonar Sounding Set Fathometer replacement/retrofit efforts include the establishment of Integrated Logistics Support (ILS) elements and engineering test procedures, qualification and acceptance testing, procurement, and installation of systems via Alteration Installation Team (AIT). The AN/UQN-10 provides a means of measuring the depth of water below the ships keel to the ocean bottom. The AN/UQN-10 performs depth sounding functions, while providing visual depth indication and recording capabilities, for measured water depths to a maximum depth of more than 7000 meters. Real-time depth information is displayed in digital readout and graphic display formats with internal depth data logging capability available for playback and use in reconstruction efforts. The AN/UQN-10 is a drop-in replacement of the legacy AN/UQN-4/4A system, designed specifically to communicate with the same shipboard system interfaces and to utilize the same TR-355 series transducer as the legacy AN/UQN-4/4A. The AN/UQN-10 employs touch screen control, new digital remote depth indicators, and a new EchoSim signal simulator. NOTE: The total AN/UQN-10 Sonar Sounding Set Fathometer retrofit requirement is 103 ships. All 103 systems were previously procured via a separate OPN Budget Line Item (BLI). 17 of those systems were previously installed via that same separate OPN BLI, leaving a balance of 86 systems to be installed via the OPN BLI 5429 Cost Code VC010 AN/UQN-10 Sonar Sounding Set Fathometer program represented here. For accounting purposes, these 86 systems are depicted within the 'Procurement' section of the OPN BLI 5429 VC010 P-3a in the Prior Years column with zero dollars shown. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 12 of 14 P-1 Line #110 Volume 4 - 138 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Retrofit of legacy AN/ UQN-4/4A Sonar Sounding Set Fathometers with next generation AN/UQN-10 system Prior Years Financial Plan Modification Number / Title: 1 / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER Modification Type: Warfighting Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER B Kits Recurring 1.1.1) VC010 - AN/UQN-10 SOUNDING SET FATHOMETER - NonOrganic (4) Subtotal: Recurring 86 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 86 / 0.000 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 86 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 86 / 0.000 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Subtotal: VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER Subtotal: Procurement, All Modification Items - / 0.000 / 0.000 Installation Modification Item 1 of 1: VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER - / 14.966 - / 1.603 - / 1.631 - / 0.714 Subtotal: Installation - / 14.966 - / 1.603 - / 1.631 - / 0.714 - / 0.000 - / 0.714 / - - / 0.714 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / 0.000 - / 18.914 / - - / 0.000 - / 18.914 Total Total Cost (Procurement + Support + Installation) LI 5429 - ASW Support Equipment Navy 14.966 1.603 1.631 0.714 0.000 UNCLASSIFIED Page 13 of 14 0.714 0.000 0.000 P-1 Line #110 0.000 0.000 0.000 18.914 Volume 4 - 139 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5429 / ASW Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER MDAP/MAIS Code: Modification Item 1 of 1: VC010 - AN/UQN-10 SONAR SOUNDING SET FATHOMETER Manufacturer Information Manufacturer Name: Knudsen Systems, Inc. Manufacturer Location: Ogdensburg, NY Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 3 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: VC010 - AN/UQN-10 SOUNDING SET FATHOMETER Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 69 / 14.966 86 / 18.914 Prior Years 7 / 1.603 7 / 1.631 3 / 0.714 0 / 0.000 3 / 0.714 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.714 - / - - / - - / - - / - 0 / 0.000 Total 69 / 14.966 7 / 1.603 7 / 1.631 3 / 0.714 0 / 0.000 86 / 18.914 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 69 1 3 2 1 1 2 2 2 - 2 1 - - - - - - - - - - - - - - - - - - 86 Out 69 1 3 2 1 1 2 2 2 - 2 1 - - - - - - - - - - - - - - - - - - 86 Footnotes: (4) NOTE: The total AN/UQN-10 Sonar Sounding Set Fathometer retrofit requirement is 103 ships. All 103 systems were previously procured via a separate OPN Budget Line Item (BLI). 17 of those systems were previously installed via that same separate OPN BLI, leaving a balance of 86 systems to be installed via the OPN BLI 5429 Cost Code VC010 AN/UQN-10 Sonar Sounding Set Fathometer program represented here. For accounting purposes, these 86 systems are depicted within the 'Procurement' section of the OPN BLI 5429 VC010 P-3a in the Prior Years column with zero dollars shown. LI 5429 - ASW Support Equipment Navy UNCLASSIFIED Page 14 of 14 P-1 Line #110 Volume 4 - 140 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 5509 / EOD Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603654N, 0604654N, 0604653N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 838.737 838.737 838.737 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 52.885 17.758 48.252 0.000 48.252 10.136 8.471 5.287 5.394 - - - - - - - - - - - 52.885 17.758 48.252 0.000 48.252 10.136 8.471 5.287 5.394 - Total 986.920 986.920 - - - - - - - - - - 52.885 17.758 48.252 0.000 48.252 10.136 8.471 5.287 5.394 - 986.920 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.498 - 0.062 - 0.062 0.142 - - - - 1.702 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Explosive Ordnance Disposal (EOD) Equipment procures Navy EOD required tools and equipment developed to support a lethal, agile, and resilient force. In alignment with efforts to modernize in accordance with the National Defense Strategy, EOD Technicians require specialized tools to enable dynamic maneuver of Ships, Submarines, and Aircraft against near peer adversaries through the render safe and mitigation of explosive hazards on land and underwater. EOD Equipment supports 134 EOD Platoons both OCONUS and CONUS operations that allow the ability to detect, access, diagnose, render safe, exploit, and dispose of threats to National Security. Threat analysis and prosecution requires increased standoff distances from increasingly lethal, dynamic and advanced weapons system threats fielded by near peer adversaries. VN870: Procures Joint Counter Radio-Controlled Improvised Explosive Device (RCIED) Electronic Warfare (CREW) systems that disrupt enemy command and control radio frequency (RF) communications associated with IEDs. Funds also procure hardware upgrades for fielded systems required to maintain capability against the evolving advanced threat. CUAS/DRAKE: Procures Counter Unmanned Aircraft (C-UAS) systems that disrupt enemy command and control radio frequency (RF) communications associated with small-UAS. Funds also procure hardware upgrades for fielded systems required to maintain capability against the evolving advanced threat. VN075: EOD Robotics: Provides USN EOD Robotics outfitting for performing UXO and IED clearance operations in remote locations or forces directly supporting maneuver forces to provide access to battlespace and ensure freedom of navigation. VN077 NAVY EOD EQUIPMENT: Procurement provides the recapitalization and modernization of EOD equipment and will address Table of Allowance (TOA) shortfalls. [P5 / JOINT CREW]: JOINT CREW Provides for the procurement, support, and other related costs of the Joint Counter Radio Controlled Improvised Explosive Device - Electronic Warfare (JCREW) program and related family of systems that provide countermeasures against the global Radio Controlled IED (RCIED) threat. LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 1 of 14 P-1 Line #111 Volume 4 - 141 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 5509 / EOD Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603654N, 0604654N, 0604653N Line Item MDAP/MAIS Code: N/A [P5 / AN/PLT-6(V)1 SYSTEMS]: AN/PLT-6(V)1 emplaced CIED system, replaces the obsolete AN/PLT-4 emplaced CIED system. [P5 / DRAKE SYSTEMS/TECH INSERTION UNDERSEA ENTERPRISE]: DRAKE SYSTEMS/TECH INSERTION UNDERSEA ENTERPRISE: Procures 13 DRAKE 2.0 systems and 27 Retrofit Kits to upgrade DRAKE 1.0 Systems currently fielded onboard all Submarine Classes. DRAKE utilizes open software architecture and Software Defined Radios, enabling upgrades as threats evolve. DRAKE 2.0 capability will be developed and fielded in two increments and DRAKE 1.0 systems will be retrofit to 2.0. Composite unit cost reflects DRAKE 2.0 full system is higher cost than a retrofit kit. [P5 / DRAKE SYSTEMS/TECH INSERTION AIR ENTERPRISE]: DRAKE SYSTEMS/TECH INSERTION AIR ENTERPRISE: Procures Retrofit Kits to upgrade 44 DRAKE 1.0 Systems currently fielded onboard all CVN Class Ships. DRAKE utilizes open software architecture and Software Defined Radios, enabling upgrades as threats evolve. DRAKE 2.0 capability will be developed and fielded in two increments and DRAKE 1.0 systems will be retrofit to 2.0. LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 2 of 14 P-1 Line #111 Volume 4 - 142 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 5509 / EOD Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603654N, 0604654N, 0604653N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / EOD - CREW Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 838.737 - / 52.885 - / 17.758 - / 48.252 - / 0.000 - / 48.252 - / 838.737 - / 52.885 - / 17.758 - / 48.252 - / 0.000 - / 48.252 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: VN077 Navy EOD Equipment - FY 2027 funding for Navy EOD Equipment supports the modernization and advancement of Naval EOD capabilities through procurement. Obsolete and aging equipment will be replaced with advanced tools and equipment specific to operational scenarios as well as future threats. Continued procurement of Spectral Radiation Monitors (SRM-50) replaces legacy monitoring systems for EOD forces to maintain mission effectiveness and operational relevance to combatant commanders. The current capability does not enable Navy EOD Forces to effectively support their counter weapons of mass destruction mission. The Timed Firing Device (TFD) allows for precise detonation at fixed times set in the field, as well as programmed times set in advance of operations, reducing the chance of early detonation before the EOD technician can reach a safe standoff distance, while simultaneously allowing EOD operations in communications denied environment. Competitive production contract award for the Timed Firing Device will enable scaling of production to meet joint requirements compared to low rate initial production capacity. VN870 JOINT CREW - FY 2027 supports procurement of engineering changes to the fielded JCREW I1B1 systems that are necessary to implement advanced countermeasure capabilities against the global Radio Controlled IED (RCIED). CUAS/DRAKE - FY 2027 qty increase of 108 units in FY 2026 to 326 units in FY 2027 due to additional $26.7M for Drake Systems to meet the Military Sealift Command (MSC) required inventory objective. The increase in FY 2027 is also due to the procurement of more complete Drake systems to complete outfitting of Ships. VN790 DRAKE Combat Operations NAVCENT: $26.2M of FY 2025 Supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) for the procurement of DRAKE Combat Operations NAVCENT. LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 3 of 14 P-1 Line #111 Volume 4 - 143 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EOD - CREW Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 52.885 17.758 48.252 0.000 48.252 - Gross/Weapon System Cost ($ in Millions) 838.737 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 838.737 Plus CY Advance Procurement ($ in Millions) - - - - - 52.885 17.758 48.252 0.000 48.252 - Total Obligation Authority ($ in Millions) 838.737 FY 2027 Total - - - - - 52.885 17.758 48.252 0.000 48.252 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.498 - 0.035 - 0.035 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - VN075 - EOD EQUIPMENT/SYSTEM Cost Recurring Cost 1.1.1) EOD (†) ROBOTICS 170,437.01 254 43.291 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 43.291 - - - - - - - - - - - - - - - Subtotal: Hardware - VN075 - EOD EQUIPMENT/ SYSTEM Cost - - 43.291 - - - - - - - - - - - - - - - - - 56.729 - - 5.032 - - 4.484 - - 3.332 - - - - - 3.332 Subtotal: Recurring Cost - - 56.729 - - 5.032 - - 4.484 - - 3.332 - - - - - 3.332 Subtotal: Hardware - VN077 - EOD OUTFITTING Cost - - 56.729 - - 5.032 - - 4.484 - - 3.332 - - - - - 3.332 Hardware - VN077 - EOD OUTFITTING Cost Recurring Cost 2.1.1) NAVY EOD EQUIPMENT (1) Hardware - VN870 - JOINT CREW Cost Non Recurring Cost 3.1.1) JOINT CREW 155,571.43 637 99.099 - - - - - - - - - - - - - - - 3.1.2) TECH INSERTION and 73,119.50 159 11.626 - - 0.963 - - 0.629 - - 0.670 - - - - - 0.670 - - 121 6.270 - - - - - - - - - - - - REFRESH (†) (2) 3.1.3) AN/PLT-6(V)1 SYSTEMS (†) - LI 5509 - EOD Equipment Navy 51,818.18 UNCLASSIFIED Page 4 of 14 P-1 Line #111 Volume 4 - 144 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EOD - CREW Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Non Recurring Cost - - 110.725 - - 7.233 - - 0.629 - - 0.670 - - - - - 0.670 Subtotal: Hardware - VN870 - JOINT CREW Cost - - 110.725 - - 7.233 - - 0.629 - - 0.670 - - - - - 0.670 420,588.24 153 64.350 207 14.460 108 12.645 326 44.250 - - - 326 44.250 81,450.00 40 3.258 - - - - - - - - - - - - - - - 57,454.55 44 2.528 - - - - - - - - - - - - - - - Hardware - CUAS/DRAKE Cost Non Recurring Cost 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS 69,855.07 117,083.33 135,736.20 135,736.20 (†) (3) (CUAS/DRAKE) 4.1.2) DRAKE SYSTEMS/TECH INSERTION UNDERSEA ENTERPRISE (†) 4.1.3) DRAKE SYSTEMS/TECH INSERTION AIR ENTERPRISE (†) 4.1.4) NSW COUNTER UNMANNED AERIAL SYSTEM (CUAS) - - 1.600 - - - - - - - - - - - - - - - 4.1.5) PRODUCTION ENGINEERING - - 14.668 - - - - - - - - - - - - - - - 4.1.6) PRODUCT IMPROVEMENT - - 9.991 - - - - - - - - - - - - - - - 4.1.7) JOINT EOD ACCEPTANCE TEST & EVALUATION - - 9.438 - - - - - - - - - - - - - - - 4.1.8) JOINT CREW ACCEPTANCE TEST & EVALUATION - - 3.104 - - - - - - - - - - - - - - - 4.1.9) VNTNG INITIAL TRAINING - - 4.096 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 113.033 - - 14.460 - - 12.645 - - 44.250 - - - - - 44.250 Subtotal: Hardware - CUAS/ DRAKE Cost - - 113.033 - - 14.460 - - 12.645 - - 44.250 - - - - - 44.250 Hardware - VN790 Israel Trache Cost Non Recurring Cost LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 5 of 14 P-1 Line #111 Volume 4 - 145 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / EOD - CREW Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) - - - Subtotal: Non Recurring Cost - - - Subtotal: Hardware - VN790 Israel Trache Cost - - - 159,512.20 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 164 26.160 - - - - - - - - - - - - - - 26.160 - - - - - - - - - - - - - - 26.160 - - - - - - - - - - - - (†) (4) (CUAS/DRAKE) Support - PRIOR YEARS CUMULATIVE FUNDING Cost 6.1) PRIOR YEAR FUNDING - - 514.959 - - - - - - - - - - - - - - - Subtotal: Support - PRIOR YEARS CUMULATIVE FUNDING Cost - - 514.959 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 838.737 - - 52.885 - - 17.758 - - 48.252 - - 0.000 - - 48.252 (†) indicates the presence of a P-5a Footnotes: (1) NAVY EOD EQUIPMENT: Procurement provides the recapitalization funds for next generation radiological detection equipment and procurement of precise timed firing devices for use in communications denied environments that Navy EOD techs will be faced with in future conflicts. (2) Joint TECH INSERTION and REFRESH: provides funding for the procurement of engineering changes to the fielded JCREW I1B1 systems that are necessary to implement advanced countermeasure capabilities against the global Radio Controlled IED (RCIED) threat. (3) Procures DRAKE 2.0 systems for the surface, subsurface, carrier, amphibious, and MSC assets for the US Navy. DRAKE 2.0 is fielded in 2 increments. Increment 1 (INC 1) is a tech refresh that mitigates obsolescence and increases onboard computing power. Increment 2 (INC 2) delivers an optimized antenna and docking station. INC 2 procurements blend with the INC 1 procurements as they are procured in the same fiscal years. This makes the unit cost appear to increase over time, however, the unit cost for each increment is consistent throughout the delivery schedule. (4) Procures 164 dismounted and mounted retrofit kits for the NAVCENT AOR. This is a new requirements. The unit cost is a composite of dismounted retrofit kits and mounted retrofit kits whereas previous unit costs were a composite of only dismounted variants. LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 6 of 14 P-1 Line #111 Volume 4 - 146 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 O O C Item Number / Title [DODIC]: 1 / EOD - CREW Equipment FY Contractor and Location Method/Type or Funding Vehicle 2024 FLIR / Boston, MA C / TBD ARMY Oct 2023 Oct 2024 81 179,310.52 Y Sep 2017 2023 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jul 2023 Nov 2024 112 72,651.79 Y Mar 2022 2024 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2024 May 2025 47 74,234.04 Y Mar 2022 2025 PARRY LABS / Columbia, MD C / FFP DLA Jan 2025 Sep 2025 121 51,818.18 Y Dec 2022 ✓ 2018 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jun 2018 Dec 2019 75 378,666.00 Y Aug 2016 ✓ 2019 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2019 May 2020 50 498,000.00 Y Aug 2016 2025 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Aug 2025 Dec 2026 207 69,855.07 Y Apr 2025 2026 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2026 May 2027 108 117,083.33 Y Sep 2025 2027 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2027 May 2028 326 135,736.20 Y Sep 2026 4.1.2) DRAKE SYSTEMS/ TECH INSERTION UNDERSEA ENTERPRISE 2024 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2024 May 2025 40 81,450.00 Y Mar 2022 4.1.3) DRAKE SYSTEMS/TECH INSERTION AIR ENTERPRISE 2024 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Jan 2024 May 2025 44 57,454.55 Y Mar 2022 2025 NORTHROP GRUMMAN / San Diego, CA C / FFP NAVSEA Aug 2025 Dec 2026 164 159,512.20 Y Apr 2025 Cost Elements (†) 1.1.1) EOD ROBOTICS 3.1.2) TECH INSERTION and (†) REFRESH 3.1.2) TECH INSERTION and (†) REFRESH 3.1.3) AN/PLT-6(V)1 SYSTEMS (†) 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/ (†) DRAKE) (†) P-1 Line Item Number / Title: 5509 / EOD Equipment Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 7 of 14 P-1 Line #111 Volume 4 - 147 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH 0 81 81 (2) 2 2023 NAVY 112 0 112 112 2 2024 NAVY 47 0 47 47 121 0 121 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 121 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 0 75 ✓ 4 2019 NAVY 50 0 50 A - 4 2025 NAVY 207 0 207 207 4 2026 NAVY 108 0 108 108 4 2027 NAVY 326 0 326 2025 NAVY 164 0 - - - - - - - - - - - - - A - - - - - - - - - 75 50 (4) 164 164 O C T LI 5509 - EOD Equipment Navy - 326 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #111 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 148 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH 0 81 81 (2) 2 2023 NAVY 112 0 112 112 2 2024 NAVY 47 0 47 47 121 0 121 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 121 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 0 75 - - ✓ 4 2019 NAVY 50 0 50 - - 4 2025 NAVY 207 0 207 207 4 2026 NAVY 108 0 108 108 4 2027 NAVY 326 0 326 2025 NAVY 164 0 20 20 14 - - - 0 1 20 20 9 0 (4) 164 164 O C T LI 5509 - EOD Equipment Navy 20 - 326 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 1 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #111 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 149 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH 0 81 81 (2) 2 2023 NAVY 112 0 112 2 2024 NAVY 47 0 47 121 0 121 A - - - 112 47 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 121 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 75 0 ✓ 4 2019 NAVY 50 50 0 0 0 4 2025 NAVY 207 0 207 207 4 2026 NAVY 108 0 108 108 4 2027 NAVY 326 0 326 326 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 2025 NAVY 164 0 164 164 O C T LI 5509 - EOD Equipment Navy (4) N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #111 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 150 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT O C T Calendar Year 2024 0 81 A - - - - - - N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH - - - - - - - - - 81 0 - - - - - - - - - - 19 19 19 19 19 17 A - - - - - - - - - - - - - - - - A - - - - (2) 2 2023 NAVY 112 0 112 2 2024 NAVY 47 0 47 121 0 121 0 8 8 8 8 8 7 15 106 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) - - - - (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 75 0 ✓ 4 2019 NAVY 50 50 0 4 2025 NAVY 207 0 207 4 2026 NAVY 108 0 108 4 2027 NAVY 326 0 326 0 0 A - 2025 NAVY 164 0 326 (4) 164 A O C T LI 5509 - EOD Equipment Navy 207 108 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #111 M A R A P R M A Y J U N J U L A U G - 164 S E P Volume 4 - 151 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH 81 0 0 (2) 2 2023 NAVY 112 112 0 2 2024 NAVY 47 40 7 7 0 121 15 106 15 0 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 15 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 15 15 15 15 16 0 (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 75 0 ✓ 4 2019 NAVY 50 50 0 4 2025 NAVY 207 0 207 4 2026 NAVY 108 0 108 4 2027 NAVY 326 0 326 0 0 - - 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 2025 NAVY 164 0 164 LI 5509 - EOD Equipment Navy - - - - - - - - - - - 30 30 30 30 30 30 27 A - - - - - - - - - - - - - - - - 15 15 15 15 15 33 0 A - - - - - - - - - 326 (4) O C T - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V 24 D E C 24 J A N 24 F E B P-1 Line #111 23 M A R 23 A P R 23 M A Y 23 J U N 0 J U L A U G S E P Volume 4 - 152 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 5509 / EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) EOD ROBOTICS Prior Years Deliveries: 173 1 2024 NAVY 81 3.1.2) TECH INSERTION and REFRESH 81 0 0 (2) 2 2023 NAVY 112 112 0 0 2 2024 NAVY 47 47 0 0 121 121 0 3.1.3) AN/PLT-6(V)1 SYSTEMS 3 2025 NAVY 0 4.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) (3) Prior Years Deliveries: 28 ✓ 4 2018 NAVY 75 75 0 0 ✓ 4 2019 NAVY 50 50 0 0 4 2025 NAVY 207 207 0 4 2026 NAVY 108 75 33 15 18 4 2027 NAVY 326 0 326 - - 0 5.1.1) COUNTER UNMANNED AIRCRAFT SYSTEMS (CUAS/DRAKE) 5 2025 NAVY 164 164 - - - - 46 46 46 46 46 46 50 0 (4) 0 0 O C T LI 5509 - EOD Equipment Navy 0 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #111 M A R A P R M A Y J U N J U L A U G S E P Volume 4 - 153 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 P-1 Line Item Number / Title: 5509 / EOD Equipment Item Number / Title [DODIC]: 1 / EOD - CREW Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 FLIR - Boston, MA TBD 2 NORTHROP GRUMMAN San Diego, CA TBD 3 PARRY LABS - Columbia, MD TBD 4 NORTHROP GRUMMAN San Diego, CA TBD 5 NORTHROP GRUMMAN San Diego, CA TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5509 - EOD Equipment Navy UNCLASSIFIED Page 14 of 14 P-1 Line #111 Volume 4 - 154 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5510 / Directed Energy Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 3.817 2.976 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 0.000 3.817 2.976 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 0.000 3.817 2.976 0.000 0.000 0.000 0.000 0.000 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Directed Energy Weapon Systems consist of multiple breakthrough technologies including laser weapons that provide for speed-of-light engagements at tactically significant ranges resulting in savings realized by minimizing the use of defensive missiles and projectiles, allowing for non-lethal determination of threat intent beyond small arms fire ranges. [P40A / DE001 - DIRECTED ENERGY SYSTEMS]: The AN/SEQ-4 Optical Dazzler Interdictor Navy (ODIN) program was initiated in FY18 in response to an urgent Fleet Counter-Intelligence, Surveillance, and Reconnaissance (C-ISR) gap. ODIN's primary mission is C-ISR capability against Electro-Optical/Infra-Red (EO/IR) sensors, is queued from a one-way CEC track feed, and has an ISR capability to aid the Fleet in battlespace awareness. ODIN is a shipboard system with multiple low power lasers for multi-band optical dazzling of long-range and very long-range surveillance systems. ODIN (Block I) development and installation of eight (8) systems is complete, and all systems are deployed on DDG 51 Class Surface Combatants. ODIN provides directed energy, shipboard Counter-Intelligence, Surveillance, and Reconnaissance (C-ISR) capabilities to the Fleet to dazzle Unmanned Aerial Systems (UASs) and other platforms that address urgent operational needs of the Fleet. LI 5510 - Directed Energy Systems Navy UNCLASSIFIED Page 1 of 3 P-1 Line #112 Volume 4 - 155 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5510 / Directed Energy Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a DIRECTED ENERGY SYSTEMS - / 0.000 - / 3.817 - / 2.976 P-40 Total Gross/Weapon System Cost - / 0.000 - / 3.817 - / 2.976 - / / 0.000 - / / 0.000 - / / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 5510 - Directed Energy Systems Navy UNCLASSIFIED Page 2 of 3 P-1 Line #112 Volume 4 - 156 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5510 / Directed Energy Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: DIRECTED ENERGY SYSTEMS FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) DE001 - DIRECTED ENERGY SYSTEMS 1.1) ILS/ PRODUCTION A - - - - - 0.517 - - 0.500 - - - - - - - - - - - - - - 1.400 - - 0.800 - - - - - - - - - - - - - - 1.800 - - 1.576 - - - - - - - - - - - - - - 0.100 - - 0.100 - - - - - - - - - Subtotal: 1) DE001 - DIRECTED ENERGY SYSTEMS - - 0.000 - - 3.817 - - 2.976 - - - - - - - - - Total - - 0.000 - - 3.817 - - 2.976 - - - - - - - - - SUPPORT (1) 1.2) ENGINEERING CHANGE PROPOSALS (ECPS) A (2) 1.3) SPARES (3) 1.4) TECH REFRESH (4) A A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Integrated Logistic Support (ILS)/Production Support - Government capability to perform repairs on system components that have failed during shipboard operations, provide Government Failure Reporting Analysis and Corrective Action System (FRACAS) support, and obtain the hardware and software maintenance required to continuously operate the system. (2) Engineering Change Proposals (ECPs) - Address previously known, emergent, and anticipated reliability and other Fleet generated emergent issues. ECPs were awarded for Non-Recurring Engineering (NRE) costs associated with the engineering changes for system components due to obsolescence of critical parts and technology. (3) (4) Spares - Procurement of long lead time spares and repair parts for critical system components that address onboard failures. Tech Refresh - Support of Government components developed in prior years that will be replaced by available (newer) components/sub-systems and will update the configuration infrastructure necessary to maintain operational readiness and improve system performance. LI 5510 - Directed Energy Systems Navy UNCLASSIFIED Page 3 of 3 P-1 Line #112 Volume 4 - 157 === page 234 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 158 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 5543 / Items Less Than $5 Million Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 111.576 111.576 111.576 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 3.193 3.635 2.592 0.000 2.592 3.230 3.222 3.167 - - - - - - - - 3.193 3.635 2.592 0.000 2.592 3.230 3.222 3.167 - - - - - - - - 3.193 3.635 2.592 0.000 2.592 3.230 3.222 3.167 To FY 2031 Complete 3.229 Continuing - Continuing - 3.229 Continuing - Total - Continuing - - 3.229 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Items Less Than $5 Million procures generic (non-weapons systems specific) test equipment needed to assess the effects of aging and exposure to environmental conditions on Navy weapons systems and ordnance such as mines, gun ammunition, missiles, pyrotechnics, demolition systems/devices, bombs, and torpedoes throughout the in-service portion of their life cycle and will be located at NAVSEA engineering field activities. Requirements for the test equipment come from a need to replace or modernize obsolete or economically non-repairable equipment or to acquire new or expanded generic test capabilities when new evaluation techniques or processes are needed. The equipment procured by these funds are generally "one of a kind" and are used to support generic Navy weapons systems and ordnance types. Weapons systems specific equipment is procured/funded via the individual weapons system Program Management offices. After the weapon specific equipment has entered the inventory, these funds adapt the capability, if feasible, to become more generic and support more than one weapon system. This reduces the overall economic burden to the Navy. RA005 - FLEET MINE SUPPORT EQUIPMENT: Mine Countermeasure (MCM) Targets are used to physically and electronically emulate foreign mine threats for Fleet training, exercises, ranges, and platform and system validation. Instrumented MCM targets can be programmed to behave and function like real foreign mine threats for mine sweeping and platform validation whereas non-instrumented MCM targets emulate foreign threats physically for mine hunting, mine neutralization, and system validation. RA003 - INDUSTRIAL FACILITIES: Description: Provides funding for the procurement of industrial equipment in support of core manufacturing and production requirements at the Government-Owned/ Contractor- Operated (GOCO) Naval Industrial Reserve Ordnance Plant (NIROP) Allegany Ballistics Laboratory (ABL) located in Rocket Center, WV. NIROP ABL is a key U.S. military industrial facility that is the source of tactical missile propulsion systems, fuzes, conventional warheads, metal and composite structures and precision projectiles in accordance with the Defense Industrial Reserve Act (10 USC 2535). Supports environmental, safety, energy conservation, and major repair projects at the GOCO facility. LI 5543 - Items Less Than $5 Million Navy UNCLASSIFIED Page 1 of 4 P-1 Line #113 Volume 4 - 159 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 6: Other Ordnance Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 5543 / Items Less Than $5 Million Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items Less Than $5 Million - / 111.576 - / 3.193 - / 3.635 - / 2.592 P-40 Total Gross/Weapon System Cost - / 111.576 - / 3.193 - / 3.635 - / 2.592 - / - - / 2.592 / 0.000 - / 2.592 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports the Fleet Mine Support Equipment program, as well as the procurement of an Automatic Bar Machine to be used to fabricate metal parts to support rocket motor and warhead production. This new machine will support continued efforts to maintain efficiency in the manufacturing process as it replaces shop equipment nearing the end of useful life. LI 5543 - Items Less Than $5 Million Navy UNCLASSIFIED Page 2 of 4 P-1 Line #113 Volume 4 - 160 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5543 / Items Less Than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Items Less Than $5 Million FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) MAINTENANCE SUPPORT ACTIVITIES 1.1) RA004 QUALITY EVAL TECH & EQUIPMENT (QETE) B 1.2) Rolling Stock on behalf of USFFC A 1.3) USFFC ORDNANCE MATERIAL HANDLING EQUIPMENT (BSO 60) A 1.4) USFFC LOCOMOTIVE REPLACEMENT (BSO 60) A 1.5) USFFC ROLLING STOCK RAIL CARS (BSO 60) A Subtotal: 1) MAINTENANCE SUPPORT ACTIVITIES - - 28.612 - - - - - - - - - - - - - - - - - 1.187 - - - - - - - - - - - - - - - - - 0.482 - - - - - - - - - - - - - - - - - 1.651 - - - - - - - - - - - - - - - - - 1.029 - - - - - - - - - - - - - - - - - 32.961 - - - - - - - - - - - - - - - - - 28.115 - - 2.646 - - 3.074 - - 2.592 - - - - - 2.592 - - 28.115 - - 2.646 - - 3.074 - - 2.592 - - - - - 2.592 - - 24.639 - - - - - - - - - - - - - - - - - 6.313 - - - - - - - - - - - - - - - - - 0.459 - - - - - - - - - - - - - - - - - 31.411 - - - - - - - - - - - - - - - - - 6.817 - - - - - - - - - - - - - - - 2) MINE COUNTERMEASURES FORCES 2.1) RA005 - FLEET MINE SUPPORT EQUIPMENT B Subtotal: 2) MINE COUNTERMEASURES FORCES 3) FRIGATES - MISSILE 3.1) RA006 - GRIFFIN MISSILE SYSTEM (GMS) A 3.2) RA007 GRIFFIN MISSILE SYSTEM (GMS) INITIAL TECHNICAL REFRESH A 3.3) RA008 - FFGFRIGATE OTHER GOVERNMENT FURNISHED EQUIPMENT (GFE) A Subtotal: 3) FRIGATES - MISSILE 4) PATROL COMBATANTS 4.1) RA007 GRIFFIN MISSILE SYSTEM (GMS) A LI 5543 - Items Less Than $5 Million Navy UNCLASSIFIED Page 3 of 4 P-1 Line #113 Volume 4 - 161 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5543 / Items Less Than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 6 Prior Years MDAP/ Item Number / Title [DODIC] INITIAL TECHNICAL REFRESH ID CD MAIS Code Subtotal: 4) PATROL COMBATANTS Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) - 6.817 Unit Cost ($) - FY 2026 Total Cost Qty (Each) Aggregated Items Title: Items Less Than $5 Million Unit Cost ($ M) - ($) - - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - ($) - - 0.561 0.00 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - - - - - 0.000 - - - 0.00 Total Cost Qty (Each) ($ M) - - 5) TOMAHAWK AND TOMAHAWK MISSILE PLANNING CENTER 5.1) RA003 INDUSTRIAL FACILITIES A 2,454K 5 12.272 547,000.00 1 0.547 561,000.00 1 1 1 0.000 Subtotal: 5) TOMAHAWK AND TOMAHAWK MISSILE PLANNING CENTER - - 12.272 - - 0.547 - - 0.561 - - - - - - - - - Total - - 111.576 - - 3.193 - - 3.635 - - 2.592 - - - - - 2.592 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 5543 - Items Less Than $5 Million Navy UNCLASSIFIED Page 4 of 4 P-1 Line #113 Volume 4 - 162 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 298.110 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 298.110 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 298.110 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 75.614 50.741 - - 75.614 50.741 - - 75.614 50.741 606.241 606.241 606.241 0.000 0.000 0.000 606.241 606.241 606.241 786.024 786.024 786.024 874.356 874.356 874.356 1,069.149 1,069.149 1,069.149 To FY 2031 Complete 1,166.580 1,166.580 1,166.580 Total 4,831.454 9,758.269 4,831.454 9,758.269 4,831.454 9,758.269 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.375 - - - - - - - - - 3.375 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Anti-Ship Missile Decoy Program covers a family of decoys and the equipment to deploy them. It is an essential element of the Anti-Ship Missile (ASM) Defense tactics to counter the threat of enemy homing missiles. Nulka is a joint program with Australia and is currently in service with the Australian and United States Navies. Nulka consists of the Decoy Launching System (DLS) (MK 53) and Offboard Active Decoy (MK 234). This line contains various equipment and subsystems for a system which will provide the capability to defeat the effectiveness of hostile Anti-Ship cruise missiles. The MK 53 DLS consists of a Decoy Launch Processer (DLP) or Decoy Launch Message Converter (DLMC), launching power supplies, and from two to six launchers depending on the ship class. Each launcher is capable of storing and launching two Nulka decoys. The MK 53 DLS provides the launch authorization and flight demands to the Nulka decoy when a Nulka engagement is initiated by the EW operator. The MK 53 DLS has been installed on the CG 47, CVN 68, DDG 51, LSD 41 and LSD 49 Classes in prior years. The Legacy Nulka decoy consists of the kit assembly, rocket motor assembly (RMAs), canister assembly and legacy payload. The legacy Nulka decoy can no longer be procured due to obsolescence issues which will be addressed by new production of kit assemblies (VV200) and RMAs (VV201). AOEW (AN/ALQ-248) was intended to provide a new persistent Electronic Attack capability for countering legacy and modern ASMs, enabling earlier ASM detect-and engagement timeline given the active decoy's extended mission profile and optimal placement relative to the intended target. AOEW was designed to be employed on a host MH-60R/S helicopter and integrated with onboard EW systems. Divestment of AOEW started in FY26, AOEW CDD was cancelled, and requirements were transferred to other programs. MK-59 Floating Decoy System (FDS) is a stand-alone, inflatable, offboard decoy that augments existing Electronic Warfare capabilities on U.S. Navy Ships. The offboard decoy provides capability against antiship missiles and is currently fielded on DDGs. A shipset consists of three launching platforms, six launchers, and six pre-loaded decoys. Infrastructure support equipment includes three launching platforms and launcher control equipment. MK-59 FDS production started in 2012 and will continue to buy additional systems. This system meets a critical Fleet need. Fielding of additional systems begins in FY26 for DDGs. The Long Endurance Electronic Decoy (LEED) program will deliver an expendable long endurance autonomous off-board decoy Countermeasure system, comprised of a flight vehicle and payload with modular capability allowing for rapid modification of the Electronic Warfare (EW) capability. LEED development executes under a middle tier rapid prototyping acquisition strategy pursuant to Section 804 of the FY16 National Defense Authorization Act. LEED will integrate with SLQ-32 and address EW gaps in response to a fleet requirement to counter legacy, modern, and future Anti-Ship Missile (ASM) threats. LEED will provide the fleet with enhanced EW coordination and capability, including the ability to stretch engagement timelines and counter heterogeneous missile attacks. LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 1 of 7 P-1 Line #114 Volume 4 - 163 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a 5530 - ANTI SHIP MISSILE DECOY SYSTEM P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 298.110 - / 75.614 - / 50.741 - / 606.241 - / 298.110 - / 75.614 - / 50.741 - / 606.241 - / - - / 606.241 / 0.000 - / 606.241 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: VV003: Funding is for Engineering Change Proposals (ECPs)/Ordnance Alterations (ORDALT) to address obsolescence, quality assurance, reliability, safety, Electromagnetic Interference (EMI), and diminishing manufacturing source issues. ECP funding will support DLS hardware updates including Circuit Card Assembly (CCA) redesigns and Power Supply System (PSS) modernization. Logistics funding will support maintenance of decoy and special purpose test equipment, non-recurring costs to produce engineering equipment, and configuration management tools for Flight Control Units (FCU MK I and FCU MK II), Propulsion Igniter Units, Thrust Control Units, Thermal Batteries, Spin Control Units and Rocket Motor Assemblies. VV830: Funding is for Production Engineering support to the MK 234 Nulka Decoy, Nulka Kit Assemblies, Rocket Motor Assembly and Nulka Payloads. VV500: Funding is to support AOEW closeout activities: ALQ-248 pods delivery to the Government, modeling and simulation completion and installation planning. Divestment of AOEW is starting in FY26. AOEW CDD was cancelled, and requirements were transferred to other programs. VV200: Funding is for procurement of Nulka Kit Assemblies (includes varying quantities and combinations of: Flight Control Units, Propulsion Igniter Units, Thrust Control Units, Spin Control Units, and Thermal Batteries based on requirements). The Nulka Kit Assembly procurements are critical to extend the in-service life of the Nulka Round. VV201: Funding is for procurement of Rocket Motor Assembly. The Rocket Motor Assembly (RMA) procurements are critical to extend the in-service life of the Nulka Round. VV005: Funding is for procurement of Nulka Modified Payload and Nulka Payloads. VV600: Funding is for procurement of MK-59 decoy systems plus government production support and installations. VV700: Funding is for procurement of LEED Anti-Ship Missile Countermeasures, Launchers, and Decoy Launching Systems. Funding also includes ship integration for multiple ship classes, ship installations, engineering services, software upgrades, manufacturing improvements, and support costs. VV800: Since the FY26 budget request, Congressional funding has been received for supporting Anti-Ship Missile defense by accelerating LEED transition to production, procuring MK-59 Decoy Countermeasures and installing MK-59. VV900: FY27 funding was received for procurement of EW Suite Integration and Mod Kit Installations, Support Asset Modifications, and Targeting Simulator Modernization. VV000: Funding is for FY24 Nulka Israel Security Replacement. LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 2 of 7 P-1 Line #114 Volume 4 - 164 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: 5530 - ANTI SHIP MISSILE DECOY SYSTEM FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) VV002 - NULKA DECOYS 1.1) Nulka Decoys A 2,274K Subtotal: 1) VV002 - NULKA DECOYS - 1 - 2.274 - - - - - - - - - - - - - - - 2.274 - - - - - - - - - - - - - - - 2) VV003 - ENG CHANGE PROPOSALS (ECPs)/ILS SUPPORT 2.1) Engineering Change Proposals (1) 2.2) Logistics/ Production Support (2) A A Subtotal: 2) VV003 - ENG CHANGE PROPOSALS (ECPs)/ILS SUPPORT - - 14.531 - - 1.735 - - 1.613 - - 1.918 - - - - - 1.918 - - 26.701 - - 12.277 - - 3.312 - - 3.370 - - - - - 3.370 - - 41.232 - - 14.012 - - 4.925 - - 5.288 - - - - - 5.288 - - 12.495 - - 3.206 - - 1.451 - - 4.541 - - - - - 4.541 - - 12.495 - - 3.206 - - 1.451 - - 4.541 - - - - - 4.541 39.953 - - - - - - - - - - - - - - - 3) VV830 - PRODUCTION ENGINEERING 3.1) Production Engineering A (3) Subtotal: 3) VV830 - PRODUCTION ENGINEERING 4) VV500 - ADVANCED OFFBOARD/EW 4.1) AOEW: AN/ ALQ-248 Pods A 4.2) AOEW: Production Support A 4.3) AOEW: Ship Installation Planning A 4.4) AOEW: Ship Integration A 4.6) AOEW: Spares A 4.7) AOEW: Engineering Services A (4) 9,988K Subtotal: 4) VV500 - ADVANCED OFFBOARD/EW 4 - - 5.731 - - 0.047 - - - - - - - - - - - - - - 0.864 - - - - - - - - - - - - - - - - - 0.382 - - - - - - - - - - - - - - - - - 2.090 - - - - - - - - - - - - - - - - - 2.262 - - - - - - - - - - - - - - - - - 51.282 - - 0.047 - - - - - - - - - - - - 300 77.451 339,275.00 40 13.571 - - - 37 13.301 - - - 37 13.301 - 77.451 - 13.571 - - - - 13.301 - - - - 13.301 287 37.557 140,102.94 68 9.527 - - - 50 7.297 - - - 50 7.297 - 37.557 - 9.527 - - - - 7.297 - - - - 7.297 5) VV200 - NULKA KIT ASSEMBLIES 5.1) Nulka Kit Assemblies A (5)(†) 258,170.00 Subtotal: 5) VV200 - NULKA KIT ASSEMBLIES - - 359,486.00 - 359,486.00 - 6) VV201 - ROCKET MOTOR ASSEMBLY (RMA) 6.1) Rocket Motor Assembly (RMA) (6)(†) A Subtotal: 6) VV201 - ROCKET MOTOR ASSEMBLY (RMA) 130,860.63 - - 145,941.74 - 145,941.74 - 7) VV202 - CANISTER ASSEMBLY LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 3 of 7 P-1 Line #114 Volume 4 - 165 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 7.1) Canister Assembly A Subtotal: 7) VV202 - CANISTER ASSEMBLY MAIS Code Unit Cost ($) Qty (Each) 53,000.00 FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: 5530 - ANTI SHIP MISSILE DECOY SYSTEM Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 60 3.180 - - - - - - - - - - - - - - - - 3.180 - - - - - - - - - - - - - - - 550,009.90 101 55.551 - - - - - - 25 19.144 - - - 25 19.144 1,267K 10 12.674 - - - - - - - - - - - - - - - - - 68.225 - - - - - - - - 19.144 - - - - - 19.144 - - - 10 8.760 - - - 10 8.760 - - - - - - - 9) VV005 - NULKA PAYLOAD 9.1) Nulka Payload A 9.2) Nulka Modified Payload A (7)(†) Subtotal: 9) VV005 - NULKA PAYLOAD 765,750.00 765,750.00 10) VV600 - MK 59 10.1) MK-59 Decoy and Launcher A (8)(†) 10.2) MK-59 Production Support (9) A 10.3) MK-59 Installation Planning A 10.4) MK-59 A (10) Installations (11) Subtotal: 10) VV600 - MK 59 31 24.161 523,000.00 - - 3.075 - - - - - 1.658 - - - - - 1.658 - - - 1.520 - - - - - 1.560 - - - - - 1.560 - - - - 6.495 - - 3.762 - - 15.423 - - - - - 15.423 - 0.000 - - 35.251 - - 6.377 - - 27.401 - - - - - 27.401 - - - - - - - - - - - 320.965 - - - - - 320.965 - - - - - - - - - - - 77.664 - - - - - 77.664 - - - - - - - - - - - 20.390 - - - - - 20.390 - - - - - - - - 1.865 - - 46.778 - - - - - 46.778 - - - - - - - - 1.250 - - 5.879 - - - - - 5.879 - - - - - - - - 3.261 - - 29.630 - - - - - 29.630 - 11) VV700 - Long Endurance Electronic Decoy (LEED) 11.1) LEED Block 1 Countermeasure (13) A 11.3) LEED Launcher A 11.4) LEED Decoy Launching Systems A 11.5) LEED Production Support A 11.6) LEED Ship Integration, Planning, A (14) (15) (16) and Installation (17) 11.7) LEED Engineering Services (18) A 779,387.00 5 2.615 876,000.00 876,000.00 (12) LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 4 of 7 P-1 Line #114 Volume 4 - 166 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Subtotal: 11) VV700 - Long Endurance Electronic Decoy (LEED) ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) - ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: 5530 - ANTI SHIP MISSILE DECOY SYSTEM FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) 0.000 - - - - - 6.376 - - 4.414 - - - - - - - - FY 2027 OOC Total Cost Unit Cost ($ M) ($) 501.306 Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - 501.306 - - - - - - - 12) VV000 - Israel Security Replacement 12.1) Israel Security Replacement (†) A Subtotal: 12) VV000 - Israel Security Replacement 1,104K 4 - - 4.414 - - - - - - - - - - - - - - - - - - - - - - - 15.642 - - - - - - - - - - - - - - - - - 13.250 - - - - - - - - - - - - - - - - - 2.720 - - - - - - - - - - - 0.000 - - - - - 31.612 - - - - - - - - - - - - - - - - - - 4,154K 12.463 - - - 4,154K - - - - - - - - - - - 2.500 - - - - - 2.500 - - - - - - - - - - - 13.000 - - - - - 13.000 Subtotal: 14) VV900 - Electronic Warfare Integration and Modification - - 0.000 - - - - - - - - 27.963 - - - - - 27.963 Total - - 298.110 - - 75.614 - - 50.741 - - 606.241 - - - - - 606.241 13) VV800 - Cong Add ASM Decoys 13.1) Accelerate LEED Transition (19) 13.2) MK-59 Decoy and Launcher 13.3) MK-59 Installations (20) (21) A A A Subtotal: 13) VV800 - Cong Add ASM Decoys 14) VV900 - Electronic Warfare Integration and Modification 14.1) Shipboard EW Suite Integration and Modification Kit Procurement A (23) 14.4) Targeting Simulator Modernization A (24) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 3 3 12.463 (22)(†) 14.3) Support Asset Procurement and Modification A indicates the presence of a P-5a Footnotes: (1) VV003[2.1] - Funding is for ECPs/Ordnance Alterations (ORDALT) to address obsolescence, quality assurance, reliability, safety, Electromagnetic Interference (EMI), and diminishing manufacturing source issues. ECP funding will support DLS hardware updates including Circuit Card Assembly (CCA) redesigns, Power Supply System (PSS) modernization and DLMC. FY26 to FY27 funding for ECPs for Thrust Control Unit and Spin Control Unit and ORDALTs increased to meet fleet requirements. (2) VV003[2.2] - Funding will support maintenance of decoy and special purpose test equipment, non-recurring costs to produce engineering equipment, and configuration management tools for Flight Control Units, Propulsion Igniter Units, Thrust Control Units, Thermal Batteries, Spin Control Units and Rocket Motor Assemblies. FCU MK II is a "form-fit" functional replacement for FCU MK I that addressed obsolescence and end of life items with new technology. (3) VV830[3.1] - Funding supports Production Engineering efforts support MK 234 Nulka Decoy, Nulka Kit Assemblies, Rocket Motor Assembly and Nulka Payloads. FY26 to FY27 funding increased to meet fleet requirements. LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 5 of 7 P-1 Line #114 Volume 4 - 167 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 (4) (5) P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System Aggregated Items Title: 5530 - ANTI SHIP MISSILE DECOY SYSTEM VV500[4.0] - Divestment of AOEW starting in FY26 resulted in cancellation of the AOEW CDD requirements and funding was transferred to other programs within BLI 5530 to support critical Fleet efforts. VV200[5.1] - Funding is for procurement of Nulka Kit Assembly required to extend the in-service life of the Nulka Round and support critical Fleet requirements. FY26 to FY27 funding and quantities for Nulka Kit Assembly increased due to Nulka service life extension requirements. Unit cost per fiscal year varies due to Kit variation. (6) (7) (8) VV201[6.1] - Funding is for procurement of Rocket Motor Assembly, required to extend in service life of the Nulka round. FY26 to FY27 funding and unit cost increased due to certification of new material. VV005[9.1] - Funding is for procurement of Nulka Y Payloads to meet demand of increasing emergent critical Fleet requirements. FY26 to FY27 Nulka Payload cost increased to support the FY27 Nulka Y Payload requirements. VV600[10.1] - Funding is for procurement of MK-59 deployable decoy systems and additional rounds to meet critical Fleet requirements. The FY27 budget request supports the procurement of qty 10 MK-59 deployable decoy systems. Since the FY26 budget request, the program has received an updated vendor estimate reflected in the new contract awarded December 2025. (9) VV600[10.2] - Production Support increases from FY26 to FY27 to support additional requirements based on production quantities in FY27. (10) (11) (12) VV600[10.3] - Installation Planning funding increased from FY26 to FY27 to support required installations for the increased procurement quantities in FY27. VV600[10.4] - Funding is for Ship Infrastructure and Installations of the MK-59 deployable decoy systems. FY26 to FY27 increase is due to additional infrastructure requirements to align with additional rounds being procured in FY27. VV700: LEED is a Middle Tier of Acquisition (MTA) Rapid Prototype effort, including RDT&E and procurement of prototype units. LEED is replacing NULKA. LEED cannot instantaneously field across all navy ships (DDGs, CVNs, CGs, LHAs, LPDs, LSDs, LCCs, and FF(X)), as such NULKA requires funding in order to ensure the Fleet does not lose capability until LEED is fielded in notable quantities across the Navy. NULKA program does have plans to procure parts to maintain currently fielded systems until 2040, and in some instances, improve capability based on the planned budget. These improvements are intended to limit the current, and growing, capability gap until LEED is fielded. Prototype systems are being funded via RDT&E in FY26. OPN funding for LEED starts in FY27. (13) VV700[11.1] - Funding is for the procurement of LEED Block 1 Countermeasures designed to defeat Anti-Ship Missiles. A Countermeasure includes the air-vehicle which flies the countermeasure and the electronic warfare payload. FY27 funding enables production of countermeasures supporting ship terminal defense. (14) (15) (16) VV700[11.3] - Funding is for procurement of LEED Launchers. Launchers integrate with the LEED Decoy Launching System and fire the LEED Countermeasure. VV700[11.4] - Funding is for the procurement of LEED Decoy Launching Systems (DLS). One shipset includes all permanent shipboard hardware needed to operate and maintain the LEED system. VV700[11.5] - Funding is for Production Support: Includes integrated product support, operator and maintainer training updates, systems engineering, technical and software support from warfare centers, field activities and other vendors required for the LEED program. Includes Softkill Coordination System (SKCS) integration and support. Includes depot stand up planning, management, and implementation, test set procurement, mission data file / tactic advancements and integration, and integrated systems of systems advancement and support. FY26 to FY27 funding increase aligns with requirement for increased depot support for units being fielded and modified tactical uses cases. (17) VV700[11.6] - Funding is for Ship Integration, Planning, and Installation: Includes topside studies, certification activities, Design Service Allocation (DSA) services, Advanced Planning (AP), system installation cost, and other Decoy Launching System (DLS) integration activities. FY26 to FY27 funding increase supports required Fleet ramp-up of ship installations. (18) VV700[11.7] - Funding is for Engineering Services: Engineering Services include system improvement initiatives and ECPs (Engineering Change Proposals). Also includes initiatives related to payload weight reduction, turbogenerator improvements, isolation, and other payload and flight vehicle advancements, and contractor initiatives to improve production efficiency and facilitate successful transition to production. FY26 to FY27 funding increase aligns with transition of prototype system to production and necessary modifications. (19) VV800[13.1] -Funding accelerates LEED transition efforts by funding ship-specific installation packages, executing topside studies for future ship classes, and incorporating engineering improvements found through testing to expedite system delivery. (20) (21) (22) VV800[13.2] - Funding is for the procurement of MK-59 rounds to meet critical Fleet requirements. VV800[13.3] - Funding is for Ship Infrastructure and Installation of the MK-59 deployable decoy systems. VV900[14.1] - Funding is for the procurement of EW Suite Modification Kits. Kits enable the LEED system to integrate with the AN/SLQ-32 Soft Kill-Coordinator System and subsequent larger Combat System. The kits also enable better overall system operational availability, multi-system operations, and platform for Artificial Intelligence and Machine Learning improvements. (23) VV900[14.3] - Funding is for Asset Procurement and Modifications. This supports hardware needed to verify LEED payload operation to include improvements to the Decoy Measurement System (DMS), equipment to replace obsolete and end of life components in existing EW verification and validation assets, update EW verification and validation assets to align LEED and EW system operational capabilities, and procure production facility acceptance equipment. (24) VV900[14.4] - Funding supports modernizing the Central Targeting Simulator (CTS). This modernization applies to the existing CTS supporting Anti-Ship Missile to EW countermeasures simulations and is required to integrate and account for improved EW capabilities offered by the LEED system. Modernization is also required to integrate LEED with other EW systems enabling multi-system simulations. LI 5530 - Anti-ship Missile Decoy System Navy UNCLASSIFIED Page 6 of 7 P-1 Line #114 Volume 4 - 168 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5530 / Anti-ship Missile Decoy System FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: 5530 - ANTI SHIP MISSILE DECOY SYSTEM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 5) VV200 - NULKA KIT ASSEMBLIES 5.1) Nulka Kit Assemblies (5) 2023 BAES / AUSTRALIA C / FFP Canberra, Australia Jan 2023 Sep 2026 81 298,641.98 Y 5.1) Nulka Kit Assemblies (5) 2024 BAES / AUSTRALIA C / FFP Canberra, Australia Jan 2024 Aug 2027 86 335,209.30 Y 5.1) Nulka Kit Assemblies (5) 2025 BAES / AUSTRALIA C / FFP Canberra, Australia Jan 2025 Aug 2028 40 339,275.00 Y 5.1) Nulka Kit Assemblies (5) 2027 BAES / AUSTRALIA C / FFP Canberra, Australia Jan 2027 Aug 2029 37 359,486.00 Y 2023 BAES / AUSTRALIA C / CPFF Canberra, Australia Dec 2022 Jun 2026 100 131,410.00 Y 2025 BAES / AUSTRALIA C / CPFF Canberra, Australia Dec 2024 Sep 2027 68 140,102.94 Y 2027 BAES / AUSTRALIA C / CPFF Canberra, Australia Dec 2026 Jun 2028 50 145,941.74 Y 6) VV201 - ROCKET MOTOR ASSEMBLY (RMA) 6.1) Rocket Motor Assembly (RMA) (6) 6.1) Rocket Motor Assembly (RMA) (6) 6.1) Rocket Motor Assembly (RMA) (6) 9) VV005 - NULKA PAYLOAD 9.1) Nulka Payload (7) 2021 Harris / Clifton, NJ SS / CPFF Washington Navy Yard Sep 2021 Jul 2026 32 589,719.00 Y 9.1) Nulka Payload (7) 2022 Harris / Clifton, NJ SS / CPFF Washington Navy Yard Sep 2022 Jan 2027 38 498,052.63 Y 9.1) Nulka Payload (7) 2023 Harris / Clifton, NJ SS / CPFF Washington Navy Yard Sep 2023 Oct 2027 31 572,709.00 Y 9.1) Nulka Payload (7) 2027 Harris / Clifton, NJ SS / CPFF Washington Navy Yard Sep 2027 Oct 2031 25 765,750.00 Y 2025 TBD / Washington Navy Yard, DC SS / FFP Washington Navy Yard Dec 2025 Dec 2026 31 779,387.00 Y 2026 TBD / Washington Navy Yard, DC SS / FFP Washington Navy Yard May 2026 May 2027 5 523,000.00 Y 2027 TBD / Washington Navy Yard, DC SS / FFP Washington Navy Yard May 2027 May 2028 10 876,000.00 Y 2024 BAES/AUSTRALIA / UNKNOWN C / CPFF Canberra, Australia Mar 2025 Mar 2027 4 1,104K N C / FFP Washington Navy Yard May 2027 Nov 2028 3 4,154K N 10) VV600 - MK 59 10.1) MK-59 Decoy and Launcher (8) 10.1) MK-59 Decoy and Launcher (8) 10.1) MK-59 Decoy and Launcher (8) 12) VV000 - Israel Security Replacement 12.1) Israel Security Replacement 14) VV900 - Electronic Warfare Integration and Modification 14.1) Shipboard EW Suite Integration and Modification Kit Procurement (22) 2027 LI 5530 - Anti-ship Missile Decoy System Navy Lockheed Martin / Syracuse, NY UNCLASSIFIED Page 7 of 7 P-1 Line #114 Volume 4 - 169 === page 246 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 170 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 578.601 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 578.601 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 578.601 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 80.236 77.889 73.681 0.000 73.681 81.899 - - - - - - 80.236 77.889 73.681 0.000 73.681 81.899 - - - - - - 80.236 77.889 73.681 0.000 73.681 81.899 129.753 129.753 129.753 132.810 132.810 132.810 To FY 2031 Complete 103.789 Continuing 103.789 103.789 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The OPN 5661 line procures, installs and delivers training devices to eight Submarine Training Facilities. These funds support Hull, Mechanical, and Electrical (HM&E), Engineering, Navigation and Combat Control System training requirements, training system upgrades and modernization for the Submarine Weapon Systems. Training devices develop system operations from basic through advanced seamanship skills to submarine crews utilized in all submarine mission sets. Funding includes modernization of training devices to maintain compatibility with existing fleet operational equipment and to implement Trainer Enhancement Changes (TECs) as directed by the Fleet Type Commanders. Line item 5661 is broken into five functional areas to support submarine training: Hull Mechanical & Electrical Trainers (HM&E), Engineering Trainers, Navigation Trainers, Combat Control Acoustic Trainers and Submarine Attack Center Trainers. [P40A / Submarine Training]: This line provides funds to procure and modernize training devices to keep them compatible with Fleet operational equipment and to implement Training Enhancement Changes (TECs) to the training systems. [P40A / TD 100 HM&E TRAINERS]: This line procures HM&E Fleet and Team Trainer Technical Training Equipment (TTE), Training Devices (TDs) and Training Enhancement Changes (TECs). Technical Training Equipment/Training Devices sustain high fidelity training and replaces equipment beyond economical repair or procures new equipment. Funds procure Submarine High Risk Trainer subsystems to meet requirements for Submarine Ship Control Operator Trainers (SCOT), Fire Fighting Trainers, Pressurized Submarine Escape Trainers and Damage Control Wet Trainers. This line also provides configuration changes for the Submarine Multipurpose Reconfigurable Training System (MRTS). The MRTS/MRTS 3D family includes VA CLASS Torpedo Room, Emergency Diesel Generator, Weapons Launch Console Team Trainer, VISIT and C4I Radio Room trainers. These training systems and TECs are identified by the Submarine Learning Center (SLC) and approved by the Fleet Type Commanders, for use at the Submarine Training Facilities. [P40A / TD200 ENGINEERING TRAINERS]: This line procures and installs Nuclear Propulsion Plant Fleet Interactive Display Equipment (FIDE) trainers, Virtual Interactive Display Equipment (VIDE) trainers, Virtual Fleet Training Devices, Basic Maintenance Course, Training Enhancement Changes (TECs), Multipurpose Reconfigurable Training Systems and other Navy Engineering Training devices for use at the Submarine Training Facilities. FIDE is required by NAVSEA 08 to provide advanced shore-based nuclear operator training. FIDEs support multiple ship classes and configurations at seven different geographic sites and Portsmouth Naval Shipyard, each requiring different levels of installation work. These training systems and TECs are identified by the Submarine Learning Center (SLC) and approved by the Fleet Type Commanders, for use at the Submarine Training Facilities. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 1 of 13 P-1 Line #115 Volume 4 - 171 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / TD 300 NAVIGATION TRAINERS]: Navigation Safety of Ship Trainer line procures Submarine Fleet and Team Navigation training devices which emulate surfaced and submerged Submarine characteristics. Navigation training systems include, but are not limited to: Virtual Reality Submarine (VRSUB), Submarine Piloting and Navigation Trainers (SPAN), Reconfigurable SPAN (RSPAN), Submarine Bridge Trainer/Integrated SPAN (SBT/ISPAN) and associated upgrades to all Homeports, Navigation Databases, Periscope Simulation (PSIM), Harbor Databases, Navy Electronic Chart Display and Information Systems (N-ECDIS), Automated Information System (AIS) and Mariner Skills Labs. Single Story Bridge Trainers (LED Panel Rings) will be procured for Homeports in lieu of a MILCON project as applicable to Submarine Training Facilities space limitations. The SBT/ISPAN is comprised of Virtual Tactical, Beam Forming Sonar Simulation Trainer (VTAC-BSST), Voyage Management System (VMS), N-ECDIS, RADAR Simulation, Navigation Aids, Periscope Simulation (PSIM), and Harbor Databases. These training systems and Training Enhancement Changes (TECs) are identified by the Submarine Learning Center (SLC) and approved by the Fleet Type Commanders, for use at the Submarine Training Facilities. [P40A / TD 400 COMBAT CONTROL ACOUSTIC TRAINERS]: This line procures Submarine Common Operational Analysis and Employment Trainer (COAET) fundamental and employment skill level, Sonar Employment Trainer (SET) and Beam Forming Sonar Simulation Trainers (BSST). These trainers provide the acoustic operator employment skills and team training for fleet requirements. Funds also provide for TECs, Virtualized Tactical Control (VTAC), Periscope Simulation (PSIM), Submarine Skills Network (SUBSKILLSNET), Weapons Control, Mission Payload Control, Advanced Processing Build (APB)/ Technical Insertion (TI),and Sonar Tactical Decision Aid (STDA) implementation. The Sonar Employment Trainer (SET) provides acoustic operator employment Fleet and team training for submarine sonar systems. SET is used to train advanced operators in the Advanced Sonar Employment and Sonar Supervisor courses. The SET is periodically upgraded to support current software Advanced Processor Builds (APBs) and Technical Insertions (TIs). Live Signal Playback capability is provided from this line for the SET, COAET and Multi-Purpose Interactive Trainer (MIT) with Submarine Training And Tactics Unified Schoolhouse (STRATUS) to support distance training. COAET provides operator and introductory team training to submarine force personnel prior to entry into the Submarine Multi Mission Team Trainer (SMMTT) as well as supplemental training to off-load the heavily utilized submarine attack center trainers. COAET utilizes partial tactical builds and emulations of the latest Sonar, Combat Control, Imaging and Electronic Warfare Systems which provide an environment substantially equivalent to that found on board ship, thus enabling students to develop and maintain the attack center familiarization to support Fleet operations. COAET supports individual operator/pipeline training at the Submarine Training Facilities. These training systems and Training Enhancement Changes (TECs) are identified by the Submarine Learning Center (SLC) and approved by the Fleet Type Commanders, for use at the Submarine Training Facilities. [P40A / TD 500 ATTACK CENTER TRAINERS]: SUBMARINE MULTI MISSION TEAM TRAINER (SMMTT) line procures shore based Combat System Team Trainers capable of training personnel in all aspects of submarine approach, attack and surveillance operations in a controlled, simulated environment to achieve submarine force readiness levels. The requirement matches the shore based configuration to the fleet modernized Hardware/Software(HW/SW) tactical builds. This includes the required capability to connect Attack Centers internally or externally using point to point technologies for dual crew training on Cooperative Engagement, Undersea Battle Problems and Extended Battle Problems as directed by the Fleet and the Aggressor Squadron. SMMTT trainer supports operator, employment, strike, and Battle Group training for enlisted and officer pipelines. SMMTT supports SSN/SSGN/SSBN crew certification and Fleet Responsive Training. SMMTT integrates Combat Control, Acoustics and Electronic Warfare systems with the All World Environment Simulation to provide realistic simulation using Authorized Navy databases and programs. This line includes modifications to the functionality of the Periscope Simulator (PSIM) to provide common imaging training for submarine attack centers. Submarine attack centers support real world recorded sensor data for playback in the training environment. This line also includes Engineering Production Model (EPM) to manage the additional TI/APB and Trainer Enhancement requirements as directed by the TYCOM. These training systems and Training Enhancement Changes (TECs) are identified by the Submarine Learning Center (SLC) and approved by the Fleet Type Commanders, for use at the Submarine Training Facilities. [P3A / Submarine Attack Center Modifications]: Submarine Attack Center Modifications line upgrades hardware, software and simulation to match current Fleet configurations. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 2 of 13 P-1 Line #115 Volume 4 - 172 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Training - / 362.339 - / 68.117 - / 65.529 - / 61.075 / - - / 61.075 P-3a 1 / Submarine Attack Center Modifications (TBD) - / 216.262 - / 12.119 - / 12.360 - / 12.606 - / 0.000 - / 12.606 P-40 Total Gross/Weapon System Cost - / 578.601 - / 80.236 - / 77.889 - / 73.681 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 73.681 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Training P-3a 1 / Submarine Attack Center Modifications (TBD) P-5a - - / 12.857 / - - / 13.114 / - - / 13.388 / - - / 13.689 / - - / - P-40 Total Gross/Weapon System Cost - / 81.899 - / 129.753 - / 132.810 - / 103.789 Continuing / 1.770 - / / 308.165 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The overall FY2027 budget decreased in value as compared to FY2026. The budget supports Undersea Warfare requirements. FY2027 adds funding for procurement and delivery of Columbia Class trainer equipment. This budget will allow the ability to support crew certification and deployment events for Columbia readiness. TD 300 NAVIGATION TRAINERS 3.1 NAVIGATION SAFETY OF SHIP TRAINERS- FY2027 procures two modernization kits to update the Submarine Bridge Trainer for Navigation Training. TYCOM requirement. In addition, starting in FY27, this line includes 3.2) SSBN SAFETY OF SHIP TRAINERS due to the procurement and final delivery of the trainers resulting in the trainers shifting to modernization and tech refresh cycle. TD 500 ATTACK CENTER TRAINERS 5.4 COLUMBIA SMMTT EPM - new requirement starting FY2027 to support the Engineering Production Model for Columbia Class training to support crew certification and Demonstration and Shakedown Operation (DASO) training as directed by the Fleet. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 3 of 13 P-1 Line #115 Volume 4 - 173 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Submarine Training ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) TD 100 HM&E TRAINERS 1.1) HIGH RISK TRAINERS A (1)(†) 1.2) SUBMARINE TRAINING DEVICES A 1.3) SHIP CONTROL A (2) TRAINERS (3)(†) Subtotal: 1) TD 100 HM&E TRAINERS 1,338K - 8 - 1,124K - 8 - 10.705 1,866K 25.821 - 8.993 1,180K 45.519 - 2 - 2 - 3.733 1,904K 1.729 - 2.360 1,204K 7.822 - 2 - 2 - 3.807 1,942K 1.763 - 2.407 1,228K 7.977 - 1 - 2 - 1.942 - - - 1,942K 1.457 - - - - 2.455 - - - 1,228K 5.854 - - - - 1 - 1.942 1.457 2 - 2.455 5.854 2) TD200 ENGINEERING TRAINERS 2.1) FIDE A (4)(†) 2.2) VIRTUAL FLEET TRAINING DEVICES A 2.3) CURRICULA AND TRAINING A (5)(†) MATERIALS (6) Subtotal: 2) TD200 ENGINEERING TRAINERS 10,569K 4 42.275 3,695K 1 3.695 3,000K 1 3.000 2,500K 1 2.500 - - - 2,500K 1 2.500 3,510K 4 14.042 1,930K 1 1.930 1,968K 1 1.968 2,007K 1 2.007 - - - 2,007K 1 2.007 - - 2.198 - - 0.848 - - 0.864 - - 0.718 - - - - - 0.718 - - 58.515 - - 6.473 - - 5.832 - - 5.225 - - - - - 5.225 2,743K 11 30.175 3,961K 2 7.922 4,040K 2 8.080 4,121K 8.242 - - - 4,121K 2,271K 7 15.895 1,523K 1 1.523 703,000.00 1 0.703 - - - - - - - - - - - 3.000 - - - - - - - - - 0.853 - - - 9.095 - - - - 1.360 - - - 1,360K 3) TD 300 NAVIGATION TRAINERS 3.1) NAVIGATION SAFETY OF SHIP TRAINERS A (7)(†) 3.2) SSBN SAFETY OF SHIP TRAINERS A 3.3) COLUMBIA SAFETY OF SHIP A (8)(†) TRAINER (9) 3.5) ENGINEERING SUPPORT (10)(†) A Subtotal: 3) TD 300 NAVIGATION TRAINERS - - 874,000.00 - 7 - 6.118 916,000.00 - 52.188 - 1,246K 17 21.182 1,308K - - 2.160 - - - 23.342 - - 2 - - - 1.832 934,000.00 11.277 - 6.541 1,334K - 1.012 - - 7.553 - 2 - 2 1.868 852,500.00 1 - 2 852,500.00 1 - 8.242 0.853 13.651 - 9.095 1.334 1,360K - 1.032 - - 0.852 - - - - - 0.852 - 2.366 - - 2.212 - - - - - 2.212 4) TD 400 COMBAT CONTROL ACOUSTIC TRAINERS 4.1) FLEET RESPONSIVE TEAM TRAINERS A (11)(†) 4.4) ENGINEERING TECH SUPPORT (12) A Subtotal: 4) TD 400 COMBAT CONTROL ACOUSTIC TRAINERS LI 5661 - Submarine Training Device Mods Navy 5 1 UNCLASSIFIED Page 4 of 13 1 P-1 Line #115 1 1.360 Volume 4 - 174 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Submarine Training Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 5) TD 500 ATTACK CENTER TRAINERS 5.1) SUBMARINE ATTACK CENTERS A 5.2) SSBN, SSGN, A (13)(†) SSN EPM (14)(†) 5.4) COLUMBIA A 5,845K 16 93.518 6,138K 4 24.550 6,260K 4 25.041 6,385K 4 25.541 - - - 6,385K 4 25.541 3,668K 7 25.673 3,836K 2 7.672 3,912K 2 7.825 3,990K 2 7.981 - - - 3,990K 2 7.981 1 3.991 - - - 3,991K 1 3.991 - - - - - - - - - 3,991K - - 63.584 - - 2.770 - - 2.837 - - 1.176 - - - - - 1.176 Subtotal: 5) TD 500 ATTACK CENTER TRAINERS - - 182.775 - - 34.992 - - 35.703 - - 38.689 - - - - - 38.689 Total - - 362.339 - - 68.117 - - 65.529 - - 61.075 - - - - - 61.075 SMMTT EPM (15)(†) 5.6) SMMTT TECH SUPPORT (16) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) 1.1 HIGH RISK TRAINERS - FY2027 funding supports procurement of one High Risk Trainer equipment suites in order to meet Fleet training requirements. 1.2 SUBMARINE TRAINING DEVICES - FY2027 procures initial design and demolition of the submarine Fire Fighting Trainer. In addition, it provides funding to upgrade damage control trainers. 1.3 SHIP CONTROL TRAINERS - FY2027 procures two Ship Control Operator Trainer Technical Refreshes. TYCOM Requirement. 2.1 FIDE - FY2027 procures Submarine Basic Maintenance Course and FIDE training laboratories and training devices required to support Nuclear Maintenance and operator training. Includes site survey, site preparation, modernization and trainer delivery for S6G, S8G, S9G, S1B, A4W, A1B and CVN77 Nuclear Power Operator Trainers. SEA08/TYCOM requirement. (5) 2.2 VIRTUAL FLEET TRAINING DEVICES - FY2027 procures a Virtual Fleet Training Device including a training laboratory and training equipment required to support virtual reality and augmented reality Fleet training. Includes site survey, site preparation, modernization and trainer delivery. TYCOM requirement. (6) (7) 2.3 CURRICULA AND TRAINING MATERIALS - FY2027 procures curricula and training support materials for NAVSEA cognizant technical training courses of instruction. TYCOM requirement. 3.1 NAVIGATION SAFETY OF SHIP TRAINERS- FY2027 procures two modernization kits to update the Submarine Bridge Trainer for Navigation Training. TYCOM requirement. In addition, starting in FY27, this line includes 3.2) SSBN SAFETY OF SHIP TRAINERS due to the procurement and final delivery of the trainers resulting in the trainers shifting to modernization and tech refresh cycle. (8) 3.2 SSBN SAFETY OF SHIP TRAINERS - FY27 consolidates this line with 3.1) NAVIGATION SAFETY OF SHIP TRAINERS due to the procurement and final delivery of the trainers resulting in the trainers shifting to modernization and tech refresh cycle. (9) 3.3 COLUMBIA SAFETY OF SHIP TRAINER - FY2027 no funds are required for this trainer. (10) (11) 3.5 ENGINEERING SUPPORT - FY2027 procures engineering support and modernization for Submarine Navigation Training devices which directly supports the Navigation Trainer Requirements. 4.1 FLEET RESPONSIVE TEAM TRAINERS - FY2027 procures one Sonar Employment Trainer (SET) to support officer and enlisted pipeline training and Fleet responsive training. Supports TYCOM requirement for pipeline and accession training. (12) 4.4 ENGINEERING TECH SUPPORT - FY2027 funds Cyber Security, Multi-Purpose Interactive Trainer (MIT) and Submarine Training And Tactics Unified Schoolhouse (STRATUS) engineering support. This also includes engineering support for Common Operations Acoustic Employment Trainer (COAET) and Sonar Employment Trainer (SET). (13) 5.1 SUBMARINE ATTACK CENTERS- FY2027 procures four Submarine Attack Center modernization efforts to include procurements related to TI/APB modernization hardware and software for SSN/SSBN/SSGN submarine attack centers. One attack center per quarter will be assembled and delivered per TYCOM approved Trainer modernization plan. These trainers are required to match trainer configuration with Tactical Fleet configuration to enable new capabilities in the Submarine Attack Centers. Trainers support crew certification, pre-deployment training, Undersea Battle Problems and Extended Battle Problems as directed by the Fleet and the Aggressor Squadron. Trainers are critical to Fleet readiness to ensure warfighters train ashore with the modernized combat, payload, acoustic, imaging, and electronic warfare systems. TYCOM requirement. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 5 of 13 P-1 Line #115 Volume 4 - 175 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Aggregated Items Title: Submarine Training (14) 5.2 SSBN, SSGN, SSN EPM - FY2027 procures two Engineering Production Models at the Warfare Centers. This effort is critical to trainer lifecycle support, engineering changes and updates without disruption of training at the Submarine Training Facilities. Includes 688, VA, SSGN, SSBN, and CLB EPMs in accordance with TYCOM approved Program of Record. (15) 5.4 COLUMBIA SMMTT EPM - new requirement starting FY2027 to support the Engineering Production Model for Columbia Class training to support crew certification and Demonstration and Shakedown Operation (DASO) training as directed by the Fleet. (16) 5.6 SMMTT TECH SUPPORT - FY2027 provides engineering tech support for Submarine Attack Center capabilities as directed by the TYCOMs. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 6 of 13 P-1 Line #115 Volume 4 - 176 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Aggregated Items: Submarine Training Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) TD 100 HM&E TRAINERS 1.1) HIGH RISK TRAINERS (1) 2021 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2020 Apr 2021 2 855,500.00 Y 1.1) HIGH RISK TRAINERS (1) 2022 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Mar 2022 Sep 2022 2 872,500.00 Y 1.1) HIGH RISK TRAINERS (1) 2023 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2022 Apr 2023 2 1,794K Y 1.1) HIGH RISK TRAINERS (1) 2024 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2023 Apr 2024 2 1,830K Y 1.1) HIGH RISK TRAINERS (1) 2025 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2024 Apr 2025 2 1,866K Y 1.1) HIGH RISK TRAINERS (1) 2026 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2025 Apr 2026 2 1,904K Y 1.1) HIGH RISK TRAINERS (1) 2027 ELECTRIC BOAT / NEW LONDON C / TBD ** NO PCO ** Oct 2026 Apr 2027 1 1,942K N 2021 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2020 Apr 2021 2 1,092K Y 2022 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Feb 2022 Aug 2022 2 1,113K Y 2023 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2022 Apr 2023 2 1,135K Y 2024 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2023 Apr 2024 2 1,157K Y 2025 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2024 Apr 2025 2 1,180K Y 2026 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2025 Apr 2026 2 1,204K Y 2027 ELECTRIC BOAT / NEW LONDON C / TBD ** NO PCO ** Oct 2026 Apr 2027 2 1,228K N 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) 1.3) SHIP CONTROL TRAINERS (3) Oct 2026 2) TD200 ENGINEERING TRAINERS 2.1) FIDE (4) 2021 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2020 Apr 2021 1 3,538K Y 2.1) FIDE (4) 2022 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Apr 2022 Oct 2022 1 3,608K Y 2.1) FIDE (4) 2023 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2022 Apr 2023 1 3,580K Y 2.1) FIDE (4) 2024 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2023 Apr 2024 1 3,623K Y 2.1) FIDE (4) 2025 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2024 Apr 2025 1 3,695K Y 2.1) FIDE (4) 2026 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2025 Apr 2026 1 3,000K Y 2.1) FIDE (4) 2027 ELECTRIC BOAT / NEW LONDON C / TBD ** NO PCO ** Oct 2026 Apr 2027 1 2,500K N LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 7 of 13 P-1 Line #115 Oct 2026 Volume 4 - 177 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) 2.2) VIRTUAL FLEET TRAINING DEVICES (5) O O C P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Aggregated Items: Submarine Training FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2021 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2020 Jul 2021 1 1,786K Y 2022 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Mar 2022 Sep 2022 1 1,821K Y 2023 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2022 Apr 2023 1 1,857K Y 2024 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2023 Apr 2024 1 1,893K Y 2025 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2024 Apr 2025 1 1,930K Y 2026 ELECTRIC BOAT / NEW LONDON C / CPFF ** NO PCO ** Oct 2025 Apr 2026 1 1,968K Y 2027 ELECTRIC BOAT / NEW LONDON C / TBD ** NO PCO ** Oct 2026 Apr 2027 1 2,007K N 2021 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2020 Apr 2022 2 3,662K Y Jan 2020 2022 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Jun 2022 Dec 2023 2 3,734K Y Mar 2022 2023 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2022 Apr 2024 2 3,808K Y Oct 2022 2024 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2023 Apr 2025 2 3,884K Y Mar 2023 2025 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2024 Apr 2026 2 3,961K Y Mar 2024 2026 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2025 Apr 2027 2 4,040K Y Apr 2025 2027 NUWC NPT / NEWPORT, RI/CD C / TBD ** NO PCO ** Oct 2026 Apr 2028 2 4,121K N 2021 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Sep 2021 Mar 2023 2 2,302K Y Jan 2020 2022 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Jun 2022 Dec 2023 2 2,348K Y Jan 2021 2023 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2022 Apr 2024 2 2,366K Y Feb 2022 Qty (Each) RFP Issue Date Oct 2025 3) TD 300 NAVIGATION TRAINERS 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.1) NAVIGATION SAFETY OF SHIP TRAINERS (7) 3.2) SSBN SAFETY OF SHIP TRAINERS (8) 3.2) SSBN SAFETY OF SHIP TRAINERS (8) 3.2) SSBN SAFETY OF SHIP TRAINERS (8) LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 8 of 13 P-1 Line #115 Oct 2026 Volume 4 - 178 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] O O C 3.2) SSBN SAFETY OF SHIP TRAINERS (8) 3.2) SSBN SAFETY OF SHIP TRAINERS (8) 3.2) SSBN SAFETY OF SHIP TRAINERS (8) P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Aggregated Items: Submarine Training FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2024 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2023 Apr 2025 1 1,860K Y Feb 2023 2025 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2024 Apr 2026 1 1,523K Y Feb 2024 2026 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2025 Apr 2027 1 703,000.00 Y Feb 2025 Qty (Each) RFP Issue Date 3.5) ENGINEERING SUPPORT (10) 2021 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2020 Apr 2022 2 847,500.00 Y 3.5) ENGINEERING SUPPORT (10) 2022 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Feb 2022 Aug 2023 1 864,000.00 Y 3.5) ENGINEERING SUPPORT (10) 2023 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2022 Apr 2024 2 881,000.00 Y 3.5) ENGINEERING SUPPORT (10) 2024 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2023 Apr 2025 2 898,500.00 Y 3.5) ENGINEERING SUPPORT (10) 2025 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2024 Apr 2026 2 916,000.00 Y 3.5) ENGINEERING SUPPORT (10) 2026 NUWC NPT / NEWPORT, RI/CD C / CPFF ** NO PCO ** Oct 2025 Apr 2027 2 934,000.00 Y 3.5) ENGINEERING SUPPORT (10) 2027 NUWC NPT / NEWPORT, RI/CD C / TBD ** NO PCO ** Oct 2026 Apr 2028 1 852,500.00 N 2021 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2020 Apr 2022 4 1,220K Y Jan 2020 2022 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Jun 2022 Dec 2023 5 1,233K Y Mar 2022 2023 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2022 Apr 2024 5 1,258K Y Jun 2022 2024 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2023 Apr 2025 3 1,283K Y Mar 2023 2025 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2024 Apr 2026 5 1,308K Y Mar 2024 2026 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2025 Apr 2027 1 1,334K Y Mar 2025 2027 NUWC NPT / NEWPORT, RI C / TBD ** NO PCO ** Oct 2026 Apr 2028 1 1,360K N 2021 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Mar 2021 Jul 2022 4 5,673K Y Jan 2020 2022 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Jun 2022 Jul 2023 4 5,786K Y Mar 2022 Oct 2026 4) TD 400 COMBAT CONTROL ACOUSTIC TRAINERS 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) 4.1) FLEET RESPONSIVE TEAM TRAINERS (11) Oct 2026 5) TD 500 ATTACK CENTER TRAINERS 5.1) SUBMARINE ATTACK CENTERS (13) 5.1) SUBMARINE ATTACK CENTERS (13) LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 9 of 13 P-1 Line #115 Volume 4 - 179 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] 5.1) SUBMARINE ATTACK CENTERS (13) 5.1) SUBMARINE ATTACK CENTERS (13) 5.1) SUBMARINE ATTACK CENTERS (13) 5.1) SUBMARINE ATTACK CENTERS (13) 5.1) SUBMARINE ATTACK CENTERS (13) O O C P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Aggregated Items: Submarine Training FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2023 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Jan 2023 Jul 2024 4 5,902K Y Jun 2022 2024 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Jan 2024 Jul 2025 4 6,019K Y Jun 2023 2025 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Jan 2025 Jul 2026 4 6,138K Y Jun 2024 2026 NSWC CD / BETHESDA, MD C / CPFF ** NO PCO ** Jan 2026 Jul 2027 4 6,260K Y Jun 2025 2027 NSWC CD / BETHESDA, MD C / TBD ** NO PCO ** Jan 2027 Jul 2028 4 6,385K N Qty (Each) RFP Issue Date Oct 2026 5.2) SSBN, SSGN, SSN EPM (14) 2021 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2020 Apr 2022 1 3,545K Y Jan 2020 5.2) SSBN, SSGN, SSN EPM (14) 2022 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Jan 2022 Apr 2023 2 3,616K Y Jan 2021 5.2) SSBN, SSGN, SSN EPM (14) 2023 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2022 Apr 2024 2 3,688K Y Feb 2022 5.2) SSBN, SSGN, SSN EPM (14) 2024 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2023 Apr 2025 2 3,761K Y Feb 2023 5.2) SSBN, SSGN, SSN EPM (14) 2025 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2024 Apr 2026 2 3,836K Y Feb 2024 5.2) SSBN, SSGN, SSN EPM (14) 2026 NUWC NPT / NEWPORT, RI C / CPFF ** NO PCO ** Oct 2025 Apr 2027 2 3,912K Y Feb 2025 5.2) SSBN, SSGN, SSN EPM (14) 2027 NUWC NPT / NEWPORT, RI C / TBD ** NO PCO ** Oct 2026 Apr 2028 2 3,990K N Oct 2026 (15) 2027 NUWC NPT / NEWPORT, RI C / TBD ** NO PCO ** Oct 2026 Apr 2028 1 3,991K N Oct 2026 5.4) COLUMBIA SMMTT EPM LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 10 of 13 P-1 Line #115 Volume 4 - 180 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 216.262 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 216.262 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Submarine Attack Center Modifications 216.262 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 12.119 12.360 12.606 0.000 12.606 12.857 13.114 13.388 13.689 1.770 - - - - - - - - - - 12.119 12.360 12.606 0.000 12.606 12.857 13.114 13.388 13.689 1.770 - - - - - - - - - - 12.119 12.360 12.606 0.000 12.606 12.857 13.114 13.388 13.689 1.770 Total 308.165 308.165 308.165 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Submarine Attack Center Modifications line upgrades hardware, software and simulation to match current Fleet configurations. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 11 of 13 P-1 Line #115 Volume 4 - 181 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Submarine Attack Center Modifications MDAP/MAIS Code: Related RDT&E PEs: 0604558N Models of Systems Affected: Submarine Attack Modification Type: TBD Center Modifications supporting SMMTT procurements and deliveries. Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Submarine Attack Center Modifications B Kits Recurring 1.1.1) Submarine Attack Center Modifications NonOrganic Subtotal: Recurring Subtotal: Submarine Attack Center Modifications Subtotal: Procurement, All Modification Items 67 / 206.428 - / 206.428 4 / 11.266 - / 206.428 / 11.266 - 67 / 206.428 4 / 11.491 / 11.266 - / 11.491 - 4 / 11.266 / 11.491 - / - / 11.720 - / - 4 / 11.720 - / - / 11.720 - / - - 4 / 11.491 - 4 / 11.720 - 4 / 11.720 / 11.720 - 4 / 11.954 / 11.720 - / 11.954 - 4 / 11.720 4 / 12.193 / 11.954 - / 12.193 - 4 / 11.954 4 / 12.449 / 12.193 - / 12.449 - 4 / 12.193 4 / 12.710 / 12.449 - / 12.710 - 4 / 12.449 - - / 0.000 - 4 / 12.710 / - - / - / 12.710 - / 0.000 95 / 290.211 / 290.211 - 95 / 290.211 / 290.211 - Installation Modification Item 1 of 1: Submarine Attack Center Modifications - / 9.834 - / 0.853 - / 0.869 - / 0.886 Subtotal: Installation - / 9.834 - / 0.853 - / 0.869 - / 0.886 - / 0.000 - / 0.886 - / 0.903 - / 0.921 - / 0.939 - / 0.979 - / 1.770 - / 17.954 / - - / 0.886 - / 0.903 - / 0.921 - / 0.939 - / 0.979 - / 1.770 - / 17.954 - Total Total Cost (Procurement + Support + Installation) LI 5661 - Submarine Training Device Mods Navy 216.262 12.119 12.360 12.606 0.000 UNCLASSIFIED Page 12 of 13 12.606 12.857 13.114 P-1 Line #115 13.388 13.689 1.770 308.165 Volume 4 - 182 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5661 / Submarine Training Device Mods Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Submarine Attack Center Modifications MDAP/MAIS Code: Modification Item 1 of 1: Submarine Attack Center Modifications Manufacturer Information Manufacturer Name: NSWC CD/NUWC NPT Manufacturer Location: BETHESDA, MD/ NEWPORT, RI (17) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 19 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: Submarine Attack Center Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 60 / 9.834 - Prior Years 4 / 0.853 3 / 0.656 - / - - / - - / - - / - - / - 0 / 0.000 67 / 11.343 FY 2025 - / - - / - 1 / 0.213 3 / 0.669 0 / 0.000 3 / 0.669 - / - - / - - / - - / - 0 / 0.000 4 / 0.882 FY 2026 - / - - / - - / - 1 / 0.217 0 / 0.000 1 / 0.217 3 / 0.682 - / - - / - - / - 0 / 0.000 4 / 0.899 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.221 3 / 0.696 - / - - / - 0 / 0.000 4 / 0.917 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.225 3 / 0.705 - / - 0 / 0.000 4 / 0.930 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.234 3 / 0.719 0 / 0.000 4 / 0.953 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.260 3 / 0.750 4 / 1.010 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 1.020 4 / 1.020 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 60 / 9.834 4 / 0.853 4 / 0.869 / - - 4 / 0.886 / - 0 / 0.000 4 / 0.886 4 / 0.903 4 / 0.921 4 / 0.939 4 / 0.979 / - - 7 / 1.770 / - 95 / 17.954 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 60 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 95 Out 60 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 95 Footnotes: (17) NSWC CD & NUWC NPT are collaborating warfare centers that manage and execute the Submarine Attack Center Modifications as directed by NAVSEA. Both warfare centers function as a prime for this effort. However, for cost efficiency purposes, they compete their cognizant tasks among multiple vendors with multiple orders to provide equipment/software in a timely manner to meet the fleet required training dates. The Submarine Attack Center delivery is not linked to any single contract date. LI 5661 - Submarine Training Device Mods Navy UNCLASSIFIED Page 13 of 13 P-1 Line #115 Volume 4 - 183 === page 260 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 4 - 184 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,004.880 1,004.880 1,004.880 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 179.960 179.960 179.960 177.885 177.885 177.885 218.181 - 0.000 - 218.181 - 0.000 - 218.181 0.000 218.181 218.181 218.181 255.745 255.745 255.745 215.828 215.828 215.828 213.824 213.824 213.824 To FY 2031 Complete 208.100 Continuing 208.100 Total - Continuing Continuing - Continuing - - Continuing Continuing 4.639 Continuing Continuing 208.100 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.172 - - - - 0.623 1.875 4.997 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line provides funding to procure, modify, and upgrade training devices, a critical investment in The Foundry, to keep them compatible with equivalent changes made to Fleet operational equipment. Funds ensure alignment between Surface Learning Centers and Fleet Concentration Area training systems and Fleet training requirements as dictated by the Surface Training Investment Plan (STIP), ultimately forging ready warfighters. Total Ship Training Capability (TSTC) formerly MB040 - BFTT/ATD SHIP SETS/ TSTC Funding supports Total Ship Training Capability (TSTC) training formerly MB040 - BFTT/ATD SHIP SETS/TSTC. The program includes Battle Force Tactical Training (BFTT), Advanced Training Domain (ATD), Zumwalt OnBoard Trainer (ZOBT), Fleet Training Wholeness (FTW), Strike Group Cooperative Engagement Capability (CEC) Training at Sea, BFTT Electronic Warfare Trainer (BEWT), Live Virtual & Constructive (LVC) Training shipboard trainers, Enhanced Collection System (ECS), Data Collection Debrief (DCD), the Combined Integrated Air and Missile Defense (IAMD)/Anti-Submarine (ASW) Trainer (CIAT) and Surface Training Program Combat System (STP-CS) (formerly Surface Advanced Virtual Environment Combat System (STAVE-CS)). These systems provide a coordinated stimulation/simulation of shipboard combat systems to facilitate combat systems team training, forming the backbone of a world-class Fleet's training pipeline, providing the capability to conduct realistic joint warfare training across the spectrum of armed conflict, and conduct realistic unit level team training in all primary warfare areas. Hardware and software upgrades including Infrastructure as a Service (IaaS) and shipboard ECS are required to integrate onboard tactical trainers, simulators and stimulators into a baseline to enable shipboard multi-warfare and multi-ship combat system team training capability to meet shipboard integrated training requirements, ensuring our sailors are fit to fight and achieve full-spectrum readiness. CVN 78 Class Training Equipment Funds provided for CVN78 Class training simulators and equipment for the Carrier Advanced Reconfigurable Training System (C-ARTS) to achieve Ready For Training (RFT) through the use of multiple mission critical CVN 78 Class Contractor Furnished Equipment (CFE) systems. Simulators or advanced training systems are needed to meet warfighter mission and safety readiness requirements. These funds support procurement and installation of hardware and software at the applicable C-ARTS sites and Centers of Excellence in Norfolk, Great Lakes, and at SWOS Newport. Class training simulators and equipment include the following: Advanced Weapons Elevators (AWEs), Machinery Control and Monitoring System (MCMS), Federated Machinery Local Area Network (FMLAN)/ Machinery Local Area Network (MLAN), Aircraft Landing and Recovery Equipment (ALRE) Jet Blast Deflector (JBD) Electromechanical Actuators, Emergency Diesel Generators (EDGs), Modular Refrigeration Units (MRU), Steering Gear Control Systems (SGCS), Zonal Electrical Distribution System (ZEDS), Vacuum Collection Holding Transfer (VCHT), Plasma Arc Waste Destruction System (PAWDS),Weapons Elevator and Stores Elevator Electromechanical Actuators (WESEEAs) and their controllers, Aviation Fuel (JP-5) Management and Transfer System, Advance Damage Control System (ADCS), Magazine Sprinkler System, Fiber Optic Cable Plant, Navigation Distribution System (NDS), Void Flooding and Damage Control Systems, Permanent Magnet Electromechanical Actuators (PMEMAs), Advanced Degaussing System (ADS), Voice and Video systems, Integrated LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 1 of 20 P-1 Line #116 Volume 4 - 185 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Video and Voice Networks, and other systems that are unique to CVN 78 Class Carriers. CFE systems procured include multiple training simulators, 3D printed training aids, ship system mock-ups, electronic classrooms, intelligent tutoring systems, and use of Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR) training content necessary for installation at the C-ARTS training facilities. LCAC Life Cycle Training System Funds are provided for procurement of Ship to Shore Connector (SSC) Lifecycle Training Solution and LCAC training system modernization. Systems are needed to allow for a baseline level of knowledge for Fleet Operators and Maintainers and achieve scheduled Ready for Training (RFT). Modern training systems are necessary to meet warfighter mission and readiness requirements. These training systems include procurement of SSC Operator Lifecycle Training and Maintainer Training, including training systems (hardware), technical data, and all associated curricula. The SSC training systems to be procured include the following; Two Full Mission Trainers (FMTs), one for east coast (Expeditionary Warfare Training Group - Atlantic (ETWG-LANT)) and one for west coast (EWTG-PAC), two Advanced Electronic Classrooms (AEC), one each for EWTG-LANT and EWTG-PAC, and three Advanced Qualification Training Devices (AQTD), one at each operational unit. Curriculum includes training for Pilots, Flight Engineer, Deck Engineer, and Craft Maintainers as well as Fleet-delivered Advanced Qualification Training. This procurement completes the delivery of the required Family of Training Systems identified in the SSC Program Capability Development Document (CDD) and other programmatic documentation as the Lifecycle Training Solution for craft crew and maintenance personnel. This effort improves craft reliability and ensures adequate trainers and training infrastructure are available to support training of LCAC 100 Class crews and maintenance personnel. Funds are provided for the upgrade / modernization of the LCAC FMT, which provides essential training for the Operator, Engineer, Navigator and Group Commander of the LCAC, in the complex skills required for safe operation of the LCAC in both normal and casualty modes. [P40A / MB040 - Combined IAMD/ASW Trainer (CIAT)]: Funding supports updates to the Combined Integrated Air and Missile Defense (IAMD) and Anti-Submarine Warfare (ASW) Trainer (CIAT) to establish a foundation for bringing this capability to AEGIS and Anti-Submarine Warfare (ASW) Baselines for ship integration to provide virtual, constructive (VC) training in a contested environment. [P40A / MB040 - Surface Training Program (STP)]: Funding supports STP (formerly Surface Advanced Virtual Environment (STAVE)) infrastructure through the procurement, delivery, installation and sustainment of distributed STP-CS hardware suites for maintainer training, procures STP shore based virtual operator labs, supporting over 10,000 students. Aggressive Fleet expansion and modernization plans for Aegis, Ship Self Defense System (SSDS) and SQQ-89 Sonar along with service life extension of the Fleet requires advanced distributed (via NCTE) training solutions to support increased throughput on complex concepts and capability. This requirement will provide increased student throughput, and gain efficiencies by enabling courses to be centrally conducted and distributed to remote classrooms located in fleet concentration areas. [P40A / MB040 - Live, Virtual, and Constructive (LVC) Training]: Funds provided for Live, Virtual, and Constructive (LVC) and Surface Combat System Training Environment (SCSTE) priorities to establish tactically and architecturally aligned integrated tactical training updates that will be developed and fielded to surface ships and shore sites. It provides a timely delivery to shore training sites to allow the sailor to train in schoolhouse facilities with tactically relevant training devices that use the same baseline configuration as the ship's fielded equipment. It enables Unit and Strike Group, in-port and at-sea high-end fight combat systems tactical training and debrief for Aegis and SSDS FFG, DDG, CG, Amphibs, Carriers, LCS, and DDG 1000. Funds support the procurement of Infrastructure as a Service (IaaS), shipboard Cooperative Engagement Capability (CEC) Embedded Trainers (CET) and shipboard Enhanced Collection Systems (ECS) for data collection and debrief, ORDALT kits and software licenses for shore sites and virtualized training in schoolhouse systems and fields an AEGIS and SSDS integrated ship and shore Live, Virtual, and Constructive (LVC) test and training architecture supporting all phases of training. Funds support shore infrastructure to support the high-fidelity Combat System Simulation/Stimulation (CS3) and SCSTE. [P40A / CVN 78 Class Training Equipment]: Funds provided for hardware and software associated with building the trainers' hardware and software for future installation at the applicable C-ARTS sites and Centers of Excellence. [P40A / SSC Life Cycle Training System Procurement]: Funds support the Ship to Shore Connector (SSC) Life Cycle Training solution to include Operator and Maintainer training systems. A new SSC Life Cycle Training solution is required because the existing LCAC training systems will not support SSC crew training based on significant configuration differences [P40A / LCAC Trainer System Upgrades and Modernization]: Funds the upgrade / modernization of the LCAC Full Motion Trainer (FMT), which provides essential training for the Operator, Engineer, Navigator and Group Commander of the LCAC, in the complex skills required for safe operation of the LCAC in both normal and casualty modes. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 2 of 20 P-1 Line #116 Volume 4 - 186 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 [P40A / Surface Training Equipment - RRL infrastructure and simulation development efforts]: Funding procures the infrastructure for two (2) standard Virtual Maintenance Trainer (VMT) Classrooms and one (1) FCA (Fire Controlman - Aegis) Common Part Task Trainer (PTT) to meet FCA student throughput and classroom technological requirements. FCA: Fire Controlmen in the Aegis system (FCA) is responsible for operating and maintaining Aegis Weapons Systems (AWS) and associated subsystems, including radar, fire control, and network systems. They provide weapon direction system employment for Integrated Air and Missile Defense (AMD) and Surface Warfare (SUW). Key duties involve testing, inspecting, and repairing radio frequency circuits, digital systems, computer equipment, and peripheral systems. [P40A / VMT - Classroom Infrastructure]: Funding procures the infrastructure for two (2) standard Virtual Maintenance Trainer (VMT) Classrooms and one (1) FCA Common Part Task Trainer (PTT) to meet FCA student throughput and classroom technological requirements. FCA (Fire Controlman - Aegis): Fire Controlmen in the Aegis system (FCA) is responsible for operating and maintaining Aegis Weapons Systems (AWS) and associated subsystems, including radar, fire control, and network systems. They provide weapon direction system employment for Integrated Air and Missile Defense (AMD) and Surface Warfare (SUW). Key duties involve testing, inspecting, and repairing radio frequency circuits, digital systems, computer equipment, and peripheral systems. [P5 / TS004 Surface Training Device Mods]: This line provides funds to procure, modify and upgrade trainers to include Aegis Weapon Systems, Aegis Ashore, DDG 1000, Surface based Navigation, Seamanship and Ship-Handling Trainers (NSST), Ship Self Defense System (SSDS), AN/SQQ-89A(V)15 Anti-Submarine Warfare (ASW) Tactical Employment Trainer (ATET), North Atlantic Treaty Organization SEASPARROW Surface Missile Systems (NSSMS), and other Surface Warfare related individual and team Training Programs to include Navigation, Hull, Mechanical and Electrical (HM&E), combat systems (CS), and Amphibious and Mine Warfare (AMW) Technical Training Equipment (TTE), Training Devices, Training Unique Equipment, Training systems, and the Surface Training Program(STP)(previously Surface Training Advanced Virtual Environemtn (STAVE). Funds provide for alignment with DON Chief Information Officer (CIO) Cyber requirements. STP methodology provides students with an immersive and interactive learning environment as well as hands-on training equipment as part of a blended solution, which accelerates learning, improves student performance, and supports both Department of the Navy (DON) High Velocity Learning and Career Training Continuum (CTC) intent. Funds ensure alignment between Surface Learning Centers and Fleet Concentration Area training systems and fleet training requirements as dictated by the Surface Training Investment Plan (STIP). Additionally, funds support the creation of training system's critical design review (CDR) packages as well as the establishment and improvement of ship on-board training curriculum for the purpose of maintaining perishable operator and maintenance skills. [P5 / Navigation Trainers]: Funds are provided for modifications/upgrades to surface Navigation Trainers in support of the Surface Warfare Mariner Skills Training Program (MSTP). Funding addresses navigation shortfalls identified during CNO-directed Comprehensive Review following the USS John S. McCain and USS Fitzgerald collisions and provides for procurement of new trainers and modifications/upgrades to surface Navigation Trainers to support the modernization of all Surface Navigation, Seamanship, and Ship-handling Trainers (NSST) in all CONUS and OCONUS Fleet Concentration Areas as well as various schoolhouse locations, in support of the Surface Warfare Mariner Skills Training Program (MSTP). This includes but is not limited to Integrated Bridge Navigation Systems, Crane Simulation Training, Navigation Instructor Services. Modernization is critical to maintaining trainer service life and will ensure all students have the necessary training devices, instructors and resources to execute the MSTP. Funds also support Bridge Part Task Trainers (BPTT). BPTTs permit selected aspects of Bridge tasks (including Readiness Control Officer [RCO] tasks) to be practiced independently of Combat Systems Operations as found in more capable Integrated Tactical Trainers (ITTs). This trainer supports Officer training pipeline at SWSC, Newport, RI in support of Division Officer, Department Head, and PXO/PCO training pipeline for Officer of the Deck Training, as well as rapid refresh and skills enhancement at the training facilities. [P5 / AEGIS Ashore Trainer/C4I/Tech Refresh]: Funds modernization, delivery, installation and life-cycle upgrades for a high fidelity Aegis Ashore Team Trainer in support of the land-based Aegis Ashore Training Continuum. Funds also provide for the integration of a C4I component, Ballistic Missile Defense (BMD) Upgrades, and tech refresh. Also funds the training facility to train Navy Sailors who will man European Phased Adaptive Approach (EPAA) land-based BMD facilities in Poland and Romania. The Aegis Ashore Team Trainer (AATT) at Dam Neck, VA will serve as the single site for individual watch team tactical training, certification events and sustainment training for Aegis Ashore rotational crews assigned to AA BMD Host Nation Sites. Funding also supports the In-Plant Support System (IPSS) for the AATT. The AATT in Dam Neck is the only means of training and certifying crews prior to arriving at their host nation site. As an alternative to funding a second AATT, this IPSS will allow for cybersecurity requirements and some maintenance to be conducted separate from the AATT. [P5 / Combined IAMD/ASW Trainer (CIAT)]: Funds are provided to procure and install tactical and other software licensing (all baselines), Information Assurance and routine software and hardware modifications of Combined Integrated Air and Missile Defense (IAMD)/Anti-submarine Warfare (ASW) Trainer (CIAT) and Reconfigurable Combat Information Center (CIC) training (RCT) systems and ensures compliance with DON Chief Information Officer (CIO) Cyber requirements and tactical ship modernization. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 3 of 20 P-1 Line #116 Volume 4 - 187 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 [P5 / Navy Training System Plan (NTSP TTE/TD Mods)]: Funds provided for procurement, installation, and upgrades for surface and expeditionary training systems in multiple Fleet Concentration Areas (FCA) in accordance with the results of DON directed and Fleet sponsored studies, NTSP updates, and Technical Training Audits. One of the key items identified in the Fleet Review Panel of Surface Force Readiness, LPD 17 Class Wholeness Task Force, Navigation Wholeness Study, Surface Engineering Training Wholeness Review, DDG 1000 wholeness review, and LHD 8/ LHA 6 MPT analyses done by the Surface Warfare Enterprise was the outdated, or lack of, training equipment in the schoolhouses. Based on this analysis, funding supports requirements identified in approximately 80 Navy Training System Plan updates and 162 Technical Training Course Audits. This investment will be for the procurement and installation of Training Equipment at Learning Centers to keep training courses in alignment with current configuration of equipment in the fleet. Investment ensures Surface Warfare Training Continuums are capable of meeting training requirements directly supporting readiness for systems/courses, including the following: 1. Advanced Welding 2. Diesel Engine C Schools 3. 4160 High Voltage Electrical Safety Training 4. Engineering Officer Schools 5. Ultrasonic Inspector Training 6. Senior Enlisted Engineering 7. Engineering Maintenance Principles and Practices 8. PA6B Diesel Engine Training 9. Cryogenic Systems Training 10. Hydraulic Systems and Components 11. Advanced Shipboard Firefighting Training 12. Machinery Repairman C Schools [P5 / Technical Training Equipment Modifications]: Funds provided for schoolhouse modifications, upgrades, and technology refreshes of end items in support of fleet training requirements including Hull Mechanical and Electrical (HM&E), and combat systems technical training equipment (TTE) for the training activities. Provides equipment to augment existing TTE due to increased student throughput, replaces equipment beyond economical repair and procures new equipment. [P5 / STP SEAFRAME SIMULATORS (DDG, LPD, LHA, LHD)]: Funding supports DDG, LPD, LHA, and LHD initial systems required for procurement of Navy schoolhouse and waterfront simulators, training devices and curriculum. The STP program develops respective unique and non-unique surface and amphibious platform training solutions ensuring applicability to more than one platform with an emphasis on procuring once to provide maximum cost avoidance. The systems supported include, but are not limited to the following: Aegis Baseline 10, AN/SPY-6, 400HZ, eRM, Main Reduction Gear (MRG), LM2500+ Gas Turbines Engines, Electric Propulsion Motor (EPM), Surface Steering Gear, AC&R, HES-C and MRU/MRS, Voyage Data Recorder (VDR), WSN-12, Next Generation Surface Search Radar (NGSSR), Situational Awareness Boundary Enforcement (SABER), Aegis Virtual Operator Trainer, Aegis Virtual Maintenance Trainer, Aircraft Ship Integrated Secure and Traverse (ASIST), Reconfigurable CIC Trainer, Ship Service Diesel Generator (SSDG), and RIB Doors & RCS Screen. Training equipment is needed to meet the Key Performance Parameter (KPP) requirements of the Capabilities Development Document. Funding supports crew pipeline and Fleet Concentration Area training requirements by procurement of hardware and software associated with existing surface trainers. This procurement enables ship Commanding Officers to witness watch stander crew performance under realistic at sea scenarios in a synthetic, shore-based environment. Crews must be able to complete mission area certifications and advanced and integrated training prior to arriving in theater. Such training requires a robust CONUS-based training infrastructure, including watch team level bridge, combat, and engineering simulators as outlined in the Capabilities Development Document (CDD). [P5 / Integrated Tactical Trainer (ITT) Modernization]: Funding supports necessary tech refresh of hardware, software/firmware on the Integrated Tactical Trainers (ITTs). [P5 / SURFACE MINOR MODS]: Funds provided for modernization for training systems for surface and expeditionary training systems in accordance with the results of DON directed and Fleet sponsored studies. Specific studies of surface training systems include: Fleet Review Panel of Surface Force Readiness, Aegis Weapon System/SPY Radar Readiness Task Force, LPD 17 Class Wholeness Task Force, LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 4 of 20 P-1 Line #116 Volume 4 - 188 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Navigation Wholeness Study, Surface Engineering Training Wholeness Review, Fleet Integrated Air and Missile Defense and Anti-Submarine Warfare Improvement Programs, Aegis Ashore, Naval Integrated Fire Control-Counter Air (NIFCCA) and C5I training requirements documents, DDG 1000 wholeness review, LHD 8/ LHA 6 Front End Analysis (FEA), Commander Naval Surface Forces (CNSF) manpower initiatives impact on readiness, and the Navy Inspector General (IG) report on Computer Based Training (CBT). Surface Training Readiness Management Systems (STRMS) - procurement of hardware/software and implementation of the tracking system and incremental scaling/modification of each mission area competency, proficiency and associated Training and Readiness (T&R) metric for comparison to Fleet requirements across all Cruiser/Destroyer (CRUDES) baselines. FCA (Fire Controlman - Aegis): Fire Controlmen in the Aegis system (FCA) is responsible for operating and maintaining Aegis Weapons Systems (AWS) and associated subsystems, including radar, fire control, and network systems. Funding procures the infrastructure for two (2) standard Virtual Maintenance Trainer (VMT) Classrooms and one (1) FCA Specialized Part Task Trainer (PTT) to meet FCA student throughput and classroom technological requirements. The extensive inventory of training systems to support 16 classes of ships requires continual modernization and modification to ensure alignment with fleet systems while addressing technology obsolescence issues. Funding is budgeted to modernize systems including the following: 1. Damage Control Wet Trainers Upgrades/Refresh - As a result of the post Bonhomme Richard fire report and the revised Surface Ship and Submarine Survivability Training Requirements (OPNAVINST 3541.1H), funding for Damage Control training and readiness is vital to ensure the renovation and modernization of the existing damage control training facilities, close training gaps, enhance trainer capabilities and increase facility lifespan for DCWT located in Newport, Norfolk, Mayport, San Diego, Pearl Harbor and Yokosuka which impacts over 55,000 students across the fleet. 2. DDG 51 Machinery Control System Maintenance Trainer 3. Electrical Maintenance Training 4. Air Conditioning and Refrigeration (AC&R) Maintenance Training 5. Deck System Equipment Training 6. Marine Sanitation Devices 7. Advanced Electronic Attack (EA) 8. Anti-Submarine Warfare (ASW) Tactical Trainers to include ASW Tactical Employment Trainer (ATET). 9. Elevator Systems 10. Steam Maintenance Training 11. DDG 1000 Training Systems 12. Expeditionary Mobile Base (ESB) Training Systems 13. Landing Craft Utility (LCU) 1600/1700 Training Systems 14. Integrated Training Facility (ITF) (Fallon, NV) 15. Surface Training Readiness Management Systems (STRMS) 16. 7m and 11m Rigid Inflatable Boat (RIB) Training Systems 17. DDG 51 FLT III New Systems Training 18. Training systems for Gas Turbine Systems Technician - Mechanical (GSM), Gunner's Mate (GM), Fire Controlman (FC), Fire Controlman Aegis (FCA), Boatswain's Mate (BM), Interior Communications Technician (IC), Sonar Technician - Surface (STG), and Operations Specialist (OS) accession training 19. Air Intercept Control (AIC) Simulators 20. Ship Service Diesel Generator (SSDG) Systems 21. Damage Control (DC) Systems 22. Engineering Water and Air Systems 23. LM2500+ Gas Turbine (GT) Systems 24. Combat Systems Virtual Operations Trainer 25. Courseware for Virtual Reality Labs 26. Lethality and Survivability Training [P5 / FFT/SLEP/MODULAR TRAINER]: Funding is essential to enable the comprehensive renovation and modernization of Firefighter Trainers (FFT) and their associated facilities. These upgrades, driven by findings from the Bonhomme Richard fire investigation and revisions to the Surface Ship and Submarine Survivability Training Requirements (OPNAVINST 3541.1H), are designed to close existing training gaps, LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 5 of 20 P-1 Line #116 Volume 4 - 189 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 enhance instructional effectiveness, and extend the operational life of the training infrastructure. As part of the Service Life Extension Program (SLEP), FFT sites located in Norfolk, Mayport, San Diego, Pearl Harbor, Yokosuka, Newport, and Great Lakes will undergo improvements that directly impact fleet-wide readiness and benefit students across the Navy. [P5 / FCA TRAINERS]: Funds are provided for upgrades to shore based trainers (Combat System, HM&E) in Fleet Concentration Areas, to include Multi Warfare Operator Trainer (MWOT). [P5 / Virtual Reality Labs, Networks & Modernization]: Funds provided for annual modernization efforts which include regular/scheduled updates/upgrades to the computer network and include procurement of new servers, relays, and switches, along with the procurement of replacement computers, monitors, keyboards, and other peripheral equipment to support increased crew throughput [P5 / Mission Bay Trainers & Modernization]: Funding supports the tech refresh and upgrades of the Mission Bay Trainers (MBT) to align with ship capabilities and to support training for Knifefish and Unmanned Influence Sweep System (UISS). [P3A / MB040 - BFTT/ATD Ship Sets]: The Total Ship Training Capability (TSTC)/Advanced Training Domain (ATD)/ Battle Force Tactical Training (BFTT) family of systems provides realistic joint warfare training across the spectrum of armed conflict; realistic unit level team training in all warfare areas; a means to link ships together which are in different homeports for coordinated training; external stimulation of shipboard training systems; and simulation of non-shipboard forces. BFTT AN/USQ-T46 and ATD AN/USQ-T52/T52A are core components of the TSTC. Battle Force Tactical Training (BFTT) T46/T52 Ship set configurations vary depending on AEGIS or Ship Self Defense System (SSDS) installation. T46/T52's for SSDS include additional materials and units to be integrated for stimulation of the ships sensors. [P3A - 2 / MB040 BFTT/ATD/TSTC Upgrade Kits]: Battle Force Tactical Training (BFTT) / Advanced Training Domain (ATD) / Total Ship Training Capability (TSTC) Upgrade Kits implement Fleet-prioritized warfighting training improvements and maintain alignment with SSDS and Aegis baseline updates to increase lethality and maintain overmatch. Additional upgrade kits being procured include Virtual Tactical Bridge Embarked Synthetic Radio (VTBeSR) and SPS-48G radar field change kits in support of initial Live, Virtual, and Constructive (LVC) enhancements. These training system improvements are a critical factor in producing competent and ready warfighters. Unit costs are variable. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 6 of 20 P-1 Line #116 Volume 4 - 190 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Ships Training Equipment - / 119.501 - / 27.620 - / 37.390 - / 25.672 / - - / 25.672 P-5 1 / TS004 Surface Training Device Mods [TS004] P-5a - / 685.870 - / 118.725 - / 113.170 - / 165.694 - / 0.000 - / 165.694 P-3a 1 / MB040 - BFTT/ATD Ship Sets (SHIPALT) - / 112.059 - / 14.400 - / 11.230 - / 9.625 - / 0.000 - / 9.625 P-3a 2 / MB040 BFTT/ATD/TSTC Upgrade Kits (Various) - / 87.450 - / 19.215 - / 16.095 - / 17.190 - / 0.000 - / 17.190 P-40 Total Gross/Weapon System Cost / 1,004.880 - / 179.960 - / 177.885 - / 218.181 - / 0.000 - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 218.181 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Ships Training Equipment P-5 1 / TS004 Surface Training Device Mods [TS004] P-5a P-3a 1 / MB040 - BFTT/ATD Ship Sets (SHIPALT) P-3a 2 / MB040 BFTT/ATD/TSTC Upgrade Kits (Various) - / 17.607 - / 17.217 - / 17.249 - / 17.743 - P-40 Total Gross/Weapon System Cost - / 255.745 - / 215.828 - / 213.824 - / 208.100 Continuing - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 12.275 - / 12.800 - / 12.950 - / 12.950 Continuing / 0.000 Continuing - / 209.766 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: CVN 78 Class Training Equipment FY27 increase of $0.688M supports the planned increase in Technical Training Equipment (TTE) requirements of new CVN 78 Class Contractor Furnished Equipment (CFE) systems. LCAC Life Cycle Training System FY27 decrease ($1.449M) for SSC/LCAC Life Cycle Training procurement is due to completion of the LCAC legacy trainer modernization in FY26. FY27 increase of $52.524M for P5 Surface Training Device Modifications in accordance with the Surface Training Investment Plan (STIP) requirements for the fiscal year. Increase due to significant planned investments to include CE 2.1.1 SURFACE MINOR MODS for STP Combat Systems Engineering training devices and tech refresh for FY27. This program provides funding to procure, modify, and upgrade training devices to keep them compatible with equivalent changes made to Fleet operational equipment. Funds ensure alignment between Surface Learning Centers and Fleet Concentration Area training systems and Fleet training requirements as dictated by the Surface Training Investment Plan (STIP). Increase in support of procurements for At-Sea LVC capability for DDG 1000 as well as Integration of Naval Strike Missile onto FFG 62 LVC embedded training capability. Ready Relevant Learning (RRL) Project prioritization reflects strategic emphasis on critical readiness requirements, with lower-priority projects deferred or scaled back accordingly. Funding adjustments for LI 5664 include strategic reductions impacting critical LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 7 of 20 P-1 Line #116 Volume 4 - 191 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 5664 / Surface Training Equipment Program Elements for Code B Items: 0204112N, 0804731N, 0204228N, 0204230N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 training capabilities -PTT Lab Procurement: Reduction from two complete sets to one, cutting $1.9M, and significantly affecting practical training capabilities. These investments are foundational to the continued modernization and scalability of RRL training across the Navy. They ensure the infrastructure and technologies are in place to meet evolving Fleet requirements, reduce time to-train, and increase training effectiveness across enlisted pipelines. The FY 2026 spend plan amount for OPN 5664 includes $179,960 thousand of discretionary and $8,200 thousand of mandatory (reconciliation) for a total of $188,160 thousand. Reconciliation funding is not yet reflected in budget exhibit controls. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 8 of 20 P-1 Line #116 Volume 4 - 192 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Other Ships Training Equipment FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Total Ship Training Capability (TSTC) formerly MB040 - BFTT/ATD SHIP SETS/TSTC 1.1) MB040 Combined IAMD/ASW Trainer (CIAT) A 1.2) MB040 - Fleet Training Wholeness Strike Group CEC Training at Sea A 1.3) MB040 - Surface Training Program (STP) A 1.4) MB040 - BFTT Ship Sets A 1.5) MB040 Live, Virtual, and Constructive (LVC) Training A Subtotal: 1) Total Ship Training Capability (TSTC) formerly MB040 BFTT/ATD SHIP SETS/TSTC - - 10.059 - - - - - 1.388 - - 1.281 - - - - - 1.281 - - 12.536 - - - - - - - - - - - - - - - - - 21.751 - - - - - 3.314 - - 2.026 - - - - - 2.026 11 5.297 - - - - - - - - - - - - - - - - - 3.692 - - 14.459 - - 25.424 - - 20.671 - - - - - 20.671 - - 53.335 - - 14.459 - - 30.126 - - 23.978 - - - - - 23.978 - - 37.682 - - 2.474 - - 0.880 - - 1.568 - - - - - 1.568 - - 37.682 - - 2.474 - - 0.880 - - 1.568 - - - - - 1.568 - - 27.484 - - 8.600 - - 0.126 - - 0.126 - - - - - 0.126 - - 1.000 - - 2.087 - - 1.494 - - - - - - - - - - - 28.484 - - 10.687 - - 1.620 - - 0.126 - - - - - 0.126 2.500 - - - - - - - - - 481,545.45 2) CVN 78 Class Training Equipment 2.1) CVN 78 Class Training Equipment (1) A Subtotal: 2) CVN 78 Class Training Equipment 3) LCAC Lifecycle Training System 3.1) SSC Life Cycle Training System Procurement A 3.2) LCAC Trainer System Upgrades and Modernization A Subtotal: 3) LCAC Lifecycle Training System 4) Surface Training Equipment - RRL infrastructure and simulation development efforts 4.1) VMT - Classroom A - - - - - - 1,250K - - - - - - - - 2.264 - - - - - - - - - Subtotal: 4) Surface Training Equipment - RRL infrastructure and simulation development efforts - - 0.000 - - - - - 4.764 - - - - - - - - - Total - - 119.501 - - 27.620 - - 37.390 - - 25.672 - - - - - 25.672 Infrastructure (2)(†) 4.2) Practical Training Labs A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 2 indicates the presence of a P-5a LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 9 of 20 P-1 Line #116 Volume 4 - 193 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5664 / Surface Training Equipment Aggregated Items Title: Other Ships Training Equipment Footnotes: (1) (2) FY27 increase of $0.688M supports the planned increase in Technical Training Equipment (TTE) requirements of new CVN 78 Class Contractor Furnished Equipment (CFE) systems. Funding figures and changes in quantities reflect explicit operational and training readiness risks after major decrease on budget liens. RRL maintains alignment with priority readiness goals, through the reduced funding presents operational risks and delays in capability delivery. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 10 of 20 P-1 Line #116 Volume 4 - 194 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 5664 / Surface Training Equipment Contractor and Location Method/Type or Funding Vehicle C / FP Aggregated Items: Other Ships Training Equipment Location of PCO Award Date Date of First Delivery Naval Station Norfolk Sep 2026 Sep 2026 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4) Surface Training Equipment - RRL infrastructure and simulation development efforts 4.1) VMT - Classroom Infrastructure (2) 2026 LI 5664 - Surface Training Equipment Navy Huntington Ingalls Industries , HII / MA UNCLASSIFIED Page 11 of 20 P-1 Line #116 2 1,250K N Jan 2027 Mar 2026 Volume 4 - 195 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / TS004 Surface Training Device Mods [TS004] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 685.870 Less PY Advance Procurement ($ in Millions) 118.725 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 165.694 - 0.000 - 113.170 165.694 - 165.694 - 118.725 FY 2027 Total 0.000 - 113.170 - 685.870 - - 118.725 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 113.170 - 685.870 FY 2027 Base - 165.694 - 165.694 - 0.000 165.694 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Trainer's Cost Cost Recurring Cost 1.1.1) Navigation (3) - - 169.632 - - 21.237 - - 15.203 - - 18.330 - - 0.000 - - 18.330 1.1.2) AEGIS Ashore Trainer/C4I/Tech Refresh - - 35.438 - - 0.700 - - 0.700 - - 0.700 - - 0.000 - - 0.700 - - 161.439 - - 20.000 - - 19.410 - - 10.600 - - 0.000 - - 10.600 - - 53.668 - - 1.500 - - 0.850 - - 1.000 - - 0.000 - - 1.000 - - 6.217 - - 0.843 - - 0.272 - - 0.272 - - 0.000 - - 0.272 - - 15.950 - - 15.760 - - 12.150 - - 35.060 - - 0.000 - - 35.060 - - 0.000 - - 1.225 - - 5.827 - - 3.761 - - 0.000 - - 3.761 - - 223.499 - - 53.489 - - 52.389 - - 75.909 - - 0.000 - - 75.909 Trainers 1.1.3) Combined IAMD/ASW Trainer (CIAT) (4) 1.1.4) Navy Training System Plan (NTSP TTE/TD Mods) (5) 1.1.5) Technical Training Equipment Modifications 1.1.6) STP SEAFRAME SIMULATORS (DDG, LPD, LHA, LHD) (6) 1.1.7) Integrated Tactical Trainer (ITT) Modernization (7) 1.1.8) SURFACE MINOR MODS (8) LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 12 of 20 P-1 Line #116 Volume 4 - 196 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / TS004 Surface Training Device Mods [TS004] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 1.1.9) FFT/SLEP/ MODULAR TRAINER (9) 1.1.10) FCA TRAINERS (10) 1.1.11) Virtual Reality Labs, Networks & Modernization (11) 1.1.12) Mission Bay Trainers & Modernization (12) Subtotal: Recurring Cost Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 13.077 - - 1.660 - - 1.670 - - 9.760 - - 0.000 - - 9.760 - - 6.950 - - 1.050 - - 1.300 - - 8.108 - - 0.000 - - 8.108 - - 0.000 - - 0.428 - - 1.457 - - 0.940 - - 0.000 - - 0.940 - - 0.000 - - 0.833 - - 1.942 - - 1.254 - - 0.000 - - 1.254 - - 685.870 - - 118.725 - - 113.170 - - 165.694 - - 0.000 - - 165.694 Subtotal: Hardware Trainer's Cost Cost - - 685.870 - - 118.725 - - 113.170 - - 165.694 - - 0.000 - - 165.694 Gross/Weapon System Cost - - 685.870 - - 118.725 - - 113.170 - - 165.694 - - 0.000 - - 165.694 Footnotes: (3) FY27 funding increased due to more planned procurements for Navigation, Seamanship, and Ship-handling Trainers (NSST) to enhance mariner proficiency and surface force readiness through expanded instructor support, key staff billets, and improved oversight of the Mariner Skills Training Program (MSTP). (4) FY27 decrease reflects the integration of the efficiencies of the Surface Combat Systems Training Environment (SCSTE), notably the implementation of the Combat System Simulator and Stimulator (CS3) and the annual AEGIS baseline upgrades it brings. (5) (6) (7) (8) FY27 increase to Navy Training Systems Plan (NTSP TTE/TD Mods) represents inflation cost growth. FY27 increase is due to maturation of unique and non-unique systems technical documentation enabling the training system solutions to be procured for DDGs, LPDs, LHAs, and LHDs. FY27 decrease reflects a decrease in the amount of Technology-Enhanced Constructed Response (TECR)s required. FY27 funding increase to Surface Minor Mods due to increased Surface Training Investment Plan (STIP) requirements, including new STP Combat Systems and Damage Control Training systems, and modernization of existing training systems. (9) FY27 increase reflects the Navy's continued commitment to modernizing and renovating the Surface Fire Fighting Trainers and Facilities. This investment ensures the delivery of realistic, reliable, and missionready training environments that directly enhance Sailors readiness and safety across the fleet. (10) (11) (12) FY27 increase supports planning efforts to address hardware installations and software updates across FCAs requirements. FY27 decrease reflects a decrease in the amount of TECRs required. FY27 decrease reflects a decrease in the amount of TECRs required. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 13 of 20 P-1 Line #116 Volume 4 - 197 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5664 / Surface Training Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / MB040 - BFTT/ATD Ship Sets MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 112.059 112.059 112.059 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 14.400 11.230 9.625 0.000 9.625 12.275 12.800 12.950 - - - - - - - - 14.400 11.230 9.625 0.000 9.625 12.275 12.800 12.950 - - - - - - - - 14.400 11.230 9.625 0.000 9.625 12.275 12.800 12.950 To FY 2031 Complete 12.950 Continuing - Continuing - 12.950 Continuing - Total - Continuing - - 12.950 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Total Ship Training Capability (TSTC)/Advanced Training Domain (ATD)/Battle Force Tactical Training (BFTT) family of systems provides realistic joint warfare training across the spectrum of armed conflict, enabling the delivery of decisive combat power. It provides realistic unit-level team training in all warfare areas; a means to link ships together which are in different homeports for coordinated training; external stimulation of shipboard training systems; and simulation of non-shipboard forces. TSTC/ATD/BFTT provides ships' Commanding Officers and Strike Group/Battle Force (SG/BF) Commanders with the ability to conduct coordinated, realistic, high-stress, combat system-level team training that reinforces the warrior ethos as an integral part of exercises for Fleet Synthetic Training (FST) and Live, Virtual, and Constructive (LVC). The Total Ship Training Capability (TSTC) integrates existing and emergent onboard training capabilities to simulate realistic, "train like you fight," combat-like conditions. Migration to TSTC improvements is required to ensure continued, persistent FST/LVC interoperability to deliver training that is commensurate with tactical capabilities. [BFTT/ATD Ship Sets] BFTT AN/USQ-T46 and ATD AN/USQ-T52/T52A are core components of the TSTC. Mitigating Commercial off the Shelf (COTS) obsolescence requires the replacement and upgrade of obsolete components, ensuring the sustained readiness of BFTT systems across the Fleet. TSTC/ATD/BFTT Ship Set funding will procure T46s and T52s and subsequent variants of hardware and software in support of AN/SQQ-89, AN/SLQ-32(V)6, AN/USG-2B, AEGIS Baseline 9, and SSDS upgrades. This ensures training systems are modernized at the speed of relevance to match tactical systems. Installation funding supports the installation of BFTT/ATD Systems. Additional costs will be incurred to procure materials needed to ensure cybersecurity requirements are met and to maintain connectivity with the Navy Continuous Training Environment (NCTE) to build a resilient training infrastructure. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 14 of 20 P-1 Line #116 Volume 4 - 198 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / MB040 - BFTT/ATD Ship Sets MDAP/MAIS Code: Related RDT&E PEs: 0204571N Models of Systems Affected: BFTT/ATD SHIP SETS Modification Type: SHIPALT - T46/T52's Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: MB040 - BFTT/ATD Ship Sets B Kits Recurring 1.1.1) BFTT/ATD Ship Sets - NonOrganic (13) Subtotal: Recurring Subtotal: MB040 - BFTT/ATD Ship Sets Subtotal: Procurement, All Modification Items 76 / 75.094 - / 75.094 76 / 75.094 12 / 9.900 - / 9.900 7 / 5.950 - 12 / 9.900 / 5.950 - 7 / 5.950 7 / 5.950 - / - 7 / 5.950 Continuing Continuing Continuing - / 8.250 Continuing Continuing / 4.700 - / 4.700 - / 5.000 - / 73.395 / 4.700 - / 4.700 - / 5.000 - / 73.395 12.950 Continuing - / - - / 5.950 - / 8.250 - / 8.250 - / 8.250 / 0.000 - / 3.675 - / 4.025 - / 4.550 - / - - / 3.675 - / 4.025 - / 4.550 - - / 75.094 - / 9.900 - / 5.950 - / 5.950 Modification Item 1 of 1: MB040 - BFTT/ATD Ship Sets - / 36.965 - / 4.500 - / 5.280 - / 3.675 Subtotal: Installation - / 36.965 - / 4.500 - / 5.280 - / 3.675 10 / 8.250 - Continuing Continuing / - - Continuing / 8.250 / - - 10 / 8.250 10 / 8.250 10 / 8.250 - - / 8.250 10 / 8.250 / 5.950 7 / 5.950 / 8.250 10 / 8.250 7 / 5.950 - / 5.950 10 / 8.250 / 8.250 10 / 8.250 - Installation - Total Total Cost (Procurement + Support + Installation) LI 5664 - Surface Training Equipment Navy 112.059 14.400 11.230 9.625 0.000 UNCLASSIFIED Page 15 of 20 9.625 12.275 12.800 P-1 Line #116 12.950 Continuing Volume 4 - 199 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / MB040 - BFTT/ATD Ship Sets MDAP/MAIS Code: Modification Item 1 of 1: MB040 - BFTT/ATD Ship Sets Manufacturer Information Manufacturer Name: GTS Manufacturer Location: Virginia Beach, VA (14) Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Sep 2025 Sep 2026 Sep 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Installation Information Method of Implementation: AIT:: Installation Name: BFTT/ATD Ship Sets Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 67 / 36.965 9 / 4.500 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 76 / 41.465 12 / 5.280 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 5.280 7 / 3.675 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - 7 / 3.675 0 / 0.000 7 / 3.675 - / - - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - 7 / 4.025 - / - - / - - / - 0 / 0.000 7 / 4.025 FY 2028 - / - - / - - / - - / - - / - - / - - / - 10 / 4.550 - / - - / - 0 / 0.000 10 / 4.550 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 4.700 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 4.700 0 / 0.000 10 / 4.700 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 5.000 10 / 5.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 67 / 36.965 9 / 4.500 12 / 5.280 7 / 3.675 0 / 0.000 7 / 3.675 7 / 4.025 10 / 4.700 10 / 4.550 10 / 4.700 - 10 / 4.700 / - - 10 / 5.000 / - 142 / 73.395 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 67 1 3 3 2 1 3 5 3 1 2 2 2 1 2 2 2 2 2 3 3 2 2 4 2 2 3 3 2 10 142 Out 67 3 3 3 1 3 3 5 2 2 3 1 2 2 2 1 2 3 4 1 2 3 4 1 2 4 3 10 142 - - Footnotes: (13) Materials and quantities installed are required to meet cyber security requirements and to maintain connectivity with Navy Continuous Training Environment (NCTE) to meet shipboard integrated training demands. Unit cost adjusted to reflect lower hardware costs. Decrease in quantity due to funding limitations. (14) Contract and Delivery Dates reflect that ship sets are contracted to procure on average 1 year prior to installation. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 16 of 20 P-1 Line #116 Volume 4 - 200 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5664 / Surface Training Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / MB040 BFTT/ATD/TSTC Upgrade Kits MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 87.450 19.215 16.095 17.190 0.000 17.190 17.607 17.217 17.249 17.743 0.000 - - - - - - - - - - - 87.450 19.215 16.095 17.190 0.000 17.190 17.607 17.217 17.249 17.743 0.000 - - - - - - - - - - - 87.450 19.215 16.095 17.190 0.000 17.190 17.607 17.217 17.249 17.743 0.000 Total 209.766 209.766 209.766 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Total Ship Training Capability (TSTC)/ Battle Force Tactical Training (BFTT) family of systems Upgrade Kits procure, install, and remove various quantities of upgrade kit/Engineering Change Proposal (ECP) system components, ShipAlts, Field Changes and Software Deliveries on surface ships and related shore sites to support the fleet's needs. Upgrade kits also support Shipboard Connectivity Suite (SCS) Tech Refresh and Fleet Synthetic Training (FST) Shipboard Network Connectivity upgrades. [BFTT/ATD/TSTC Upgrade Kits] ShipAlts are upgrades driven by Combat Systems configuration as well as training configuration requirements. Field Changes include existing BFTT Hardware T46 and Software Baselines 5.0 and 5.1 upgrades, Advanced Training Domain (ATD) T52/T52A hardware upgrades, Battle force Electronic Warfare Trainer (BEWT) Baseline II Hardware & Software upgrades, and Training Simulation Stimulation System (TSSS) legacy radar interface upgrades, Virtual Tactical Bridge Embarked Synthetic Radio (VTBeSR) systems, and shipboard Cooperative Engagement Capability (CEC) Embedded Trainers (CET). Software Deliveries are required to support Combat System, IA/cyber and BFTT/BEWT/BEWT-II/TSTC/TSSS/VTBeSR Hardware requirements. Upgrade BFTT/TSTC Shipboard Connectivity Suite (SCS) through a Tech Refresh, to meet Navy Continuous Training Environment (NCTE), interoperability, and cybersecurity requirements. Upgrade Shipboard Network Connectivity in support of Fleet Synthetic Training (FST) At Sea capability in support of Strike Group certification training events. Upgrades include Information Assurance (IA)/cybersecurity compliance, as well as Obsolescence, Network upgrades and externally driven interface modifications. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 17 of 20 P-1 Line #116 Volume 4 - 201 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / MB040 BFTT/ATD/TSTC Upgrade Kits MDAP/MAIS Code: Models of Systems Affected: Battle Force Tactical Training, Advanced Training Domain, Total Ship Training Capability Upgrade Kit Prior Years Related RDT&E PEs: 0204571N Modification Type: Various FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: MB040 BFTT/ATD/TSTC Upgrade Kits B Kits Recurring 1.1.1) BFTT/ATD/TSTC Upgrade Kits - NonOrganic Subtotal: Recurring Subtotal: MB040 BFTT/ATD/TSTC Upgrade Kits Subtotal: Procurement, All Modification Items (15) 659 / 33.426 - 103 / 8.621 / 33.426 659 / 33.426 - / 33.426 Modification Item 1 of 1: MB040 BFTT/ATD/TSTC Upgrade Kits - / 54.024 Subtotal: Installation - / 54.024 - / 8.621 103 / 8.621 85 / 7.331 - / 7.331 85 / 7.331 89 / 7.646 - / - 89 / 7.646 / 7.646 - / - - 89 / 7.646 - / - 89 / 7.646 - / - - / 7.646 / 0.000 - / 9.544 / - - / 9.544 - / 8.621 - / 7.331 - / 7.646 - / 10.594 - / 8.764 - / 9.544 - / 10.594 - / 8.764 - / 9.544 - 91 / 7.574 / 7.646 - / 7.574 91 / 7.574 93 / 7.787 - / 7.787 93 / 7.787 90 / 7.651 - / 7.651 90 / 7.651 92 / 7.865 - / 7.865 - 1,302 / 87.901 / 0.000 - 92 / 7.865 / - - / - - / 87.901 1,302 / 87.901 / 7.574 - / 7.787 - / 7.651 - / 7.865 - / 0.000 - / 10.033 - / 9.430 - / 9.598 - / 9.878 - / 0.000 - / 121.865 - / 10.033 - / 9.430 - / 9.598 - / 9.878 - / 0.000 - / 121.865 - - / 87.901 Installation - Total Total Cost (Procurement + Support + Installation) LI 5664 - Surface Training Equipment Navy 87.450 19.215 16.095 17.190 0.000 UNCLASSIFIED Page 18 of 20 17.190 17.607 17.217 P-1 Line #116 17.249 17.743 0.000 209.766 Volume 4 - 202 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 5664 / Surface Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / MB040 BFTT/ATD/TSTC Upgrade Kits MDAP/MAIS Code: Modification Item 1 of 1: MB040 BFTT/ATD/TSTC Upgrade Kits Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS (16) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: AIT:: Installation Name: BFTT/ATD/TSTC Upgrade Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 659 / 54.024 51 / 0.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 103 / 10.594 - / - - / - - / - - / - 0 / 0.000 85 / 8.764 41 / 0.000 - / - - / - - / - 0 / 0.000 89 / 9.544 43 / 0.000 - / - - / - 0 / 0.000 91 / 10.033 - Prior Years 625 / 54.024 34 / 0.000 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 52 / 10.594 625 / 54.024 42 / 8.764 86 / 10.594 93 / 8.764 43 / 0.000 0 / 0.000 43 / 0.000 48 / 9.544 0 / 0.000 48 / 9.544 91 / 9.544 0 / 0.000 48 / 10.033 91 / 9.544 51 / 9.430 89 / 10.033 42 / 0.000 48 / 9.598 94 / 9.430 / - 0 / 0.000 93 / 9.430 42 / 0.000 0 / 0.000 90 / 9.598 51 / 9.878 41 / 0.000 92 / 9.878 - 90 / 9.598 / - - 93 / 9.878 / - - 41 / 0.000 1,302 / 121.865 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 In 625 21 13 25 27 27 24 20 22 23 20 24 24 20 21 22 26 21 22 25 26 23 19 19 29 24 18 25 26 41 1,302 Out 625 21 13 25 27 27 24 20 22 23 20 24 24 20 21 22 26 21 22 25 26 23 19 19 29 24 18 25 26 41 1,302 TC Tot Footnotes: (15) P40A CEC Training at Sea consolidated to P3A Upgrade Kits line. Unit cost adjusted to reflect lower hardware costs. Quantity increase for additional upgrade kits for LCS in accordance with fleet priorities. Install cost increase reflects increasing Planning Yard and Alteration Installation Team (AIT) installation cost requirements, inflation, and upgrade complexity. Unit costs are variable due to the unique software and/or hardware required by the specific training capability improvement. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 19 of 20 P-1 Line #116 Volume 4 - 203 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 04 / 7 P-1 Line Item Number / Title: 5664 / Surface Training Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / MB040 BFTT/ATD/TSTC Upgrade Kits MDAP/MAIS Code: (16) Upgrade kit procurements are on average initiated in first quarter and become available in second quarter of the current fiscal year for installation in third quarter, finishing in second quarter of the next fiscal year. LI 5664 - Surface Training Equipment Navy UNCLASSIFIED Page 20 of 20 P-1 Line #116 Volume 4 - 204