=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 3 of 5 Other Procurement, Navy Budget Activity 03 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activity 01............................................................................................................................................................. Volume 1 Budget Activity 02............................................................................................................................................................. Volume 2 Budget Activity 03............................................................................................................................................................. Volume 3 Budget Activity 04............................................................................................................................................................. Volume 4 Budget Activities 05-08.....................................................................................................................................................Volume 5 UNCLASSIFIED Volume 3 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 3 Table of Contents Cost of Report............................................................................................................................................................. Volume 3 - v Introduction and Explanation of Contents..............................................................................................................Volume 3 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 3 - ix Master Line Item Table of Contents (by Appropriation then Line Number)...........................................................Volume 3 - li Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................. Volume 3 - lxi Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 3 - lxix Line Item Table of Contents (Alphabetically by Line Item Title)......................................................................... Volume 3 - lxxi Executive Summary...............................................................................................................................................Volume 3 - lxxiii Exhibit P-40s................................................................................................................................................................ Volume 3 - 1 UNCLASSIFIED Volume 3 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - iv === page 7 === OPN 1 OPN 2 OPN 3 OPN 4 OPN 5-8 The estimated cost of this report for the Department of the Navy (DON) is $58,268. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $58,268 The estimated cost of this report for the Department of the Navy (DON) is $100,759. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $100,759 The estimated cost of this report for the Department of the Navy (DON) is $23,118. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $23,118 The estimated cost of this report for the Department of the Navy (DON) is $38,526. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $38,526 The estimated cost of this report for the Department of the Navy (DON) is $29,304. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $29,304 Volume 3 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - vi === page 9 === Department of Defense Appropriations Act, 2027 Other Procurement, Navy For procurement, production, and modernization of support equipment and materials not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships, and ships authorized for conversion); the purchase of passenger motor vehicles for replacement only; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $18,866,679 to remain available for obligation until September 30, 2029, of which $0 shall be available for the Navy Reserve and the Marine Corps Reserve: Provided, That such funds are also available for the maintenance, repair, and modernization of ships. Volume 3 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy 15,817,464 14,693,978 5,802,107 20,496,085 Grand Total Department of War 15,817,464 14,693,978 5,802,107 20,496,085 UNCLASSIFIED Volume 3 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 Total Department of the Navy 18,866,679 50,000 18,916,679 Grand Total Department of War 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 3 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy UNCLASSIFIED Volume 3 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 3 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ships support equipment 6,488,639 5,839,954 3,510,954 9,350,908 02. Communications and electronics equipment 4,075,820 4,467,421 143,000 4,610,421 03. Aviation support equipment 883,449 843,043 80,000 923,043 04. Ordnance support equipment 1,432,684 1,660,570 17,380 1,677,950 260,583 350,308 200 350,508 1,049,044 672,821 40,800 713,621 05. Civil engineering support equipment 06. Supply support equipment 07. Personnel and command support equipment 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 15,817,464 14,693,978 5,802,107 20,496,085 08. Spares and repair parts Total Other Procurement, Navy UNCLASSIFIED Volume 3 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ships support equipment 7,696,789 02. Communications and electronics equipment 50,000 7,746,789 5,446,166 5,446,166 03. Aviation support equipment 899,479 899,479 04. Ordnance support equipment 2,210,273 2,210,273 05. Civil engineering support equipment 353,489 353,489 06. Supply support equipment 396,204 396,204 1,098,568 1,098,568 765,711 765,711 07. Personnel and command support equipment 08. Spares and repair parts Total Other Procurement, Navy 18,866,679 UNCLASSIFIED 50,000 18,916,679 Volume 3 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 20,840 9,978 9,978 A U 77,592 62,004 62,004 A U 97,206 96,945 96,945 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 275,575 204,863 204,863 5 DDG Mod A U 822,065 878,787 878,787 6 Firefighting Equipment A U 38,521 36,488 36,488 UNCLASSIFIED Volume 3 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 22,668 22,668 A U 103,871 103,871 A U 83,510 83,510 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 344,885 344,885 5 DDG Mod A U 1,000,278 1,000,278 6 Firefighting Equipment A U 177,708 177,708 UNCLASSIFIED Volume 3 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 7 Command and Control Switchboard A U 2,402 2,417 8 LHA/LHD Midlife A U 76,601 60,617 9 LCC 19/20 Extended Service Life Program A U 7,352 19,276 19,276 10 Pollution Control Equipment B U 23,440 22,477 22,477 11 Submarine Support Equipment A U 278,766 383,062 383,062 12 Virginia Class Support Equipment A U 43,565 52,039 52,039 13 LCS Class Support Equipment U 5,855 2,551 2,551 14 Submarine Batteries U 30,470 28,169 28,169 15 LPD Class Support Equipment U 45,738 96,542 16 DDG 1000 Class Support Equipment A U 325,668 115,267 115,267 17 Strategic Platform Support Equip A U 53,931 38,039 38,039 UNCLASSIFIED 2,417 65,400 29,000 126,017 125,542 Volume 3 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7 Command and Control Switchboard A U 2,259 2,259 8 LHA/LHD Midlife A U 131,315 131,315 9 LCC 19/20 Extended Service Life Program A U 766 766 10 Pollution Control Equipment B U 22,506 22,506 11 Submarine Support Equipment A U 330,951 330,951 12 Virginia Class Support Equipment A U 83,297 83,297 13 LCS Class Support Equipment U 15,815 15,815 14 Submarine Batteries U 26,211 26,211 15 LPD Class Support Equipment U 213,723 213,723 16 DDG 1000 Class Support Equipment A U 58,284 58,284 17 Strategic Platform Support Equip A U 72,163 72,163 UNCLASSIFIED Volume 3 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2025 Actuals Sec U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 4,586 Cost Qty Qty 5,849 U A Cost FY 2026 Total Cost 5,849 694,020 694,020 20,321 20,321 U 11,013 U 16,650 22,355 A U 66,346 12,691 A U 3,254 2,607 2,607 22,355 7,400 20,091 Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,573,098 2,392,620 2,392,620 25 Reactor Components A U 445,974 474,806 474,806 A U 14,000 7,842 7,842 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 3 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 7,440 7,440 U 585 585 U 22,515 22,515 U 20,575 20,575 A U 69,425 69,425 A U 2,425 2,425 A Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,737,140 2,737,140 25 Reactor Components A U 519,821 519,821 A U 33,013 33,013 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 3 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 28 Standard Boats A U 447,298 A U 1,950,714 1,950,714 82,086 5,100 87,186 209,304 394,998 390,600 785,598 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 56,103 38,880 38,880 31 LCS MCM Mission Modules U 118,247 91,372 91,372 32 LCS SUW Mission Modules U 11,101 3,790 3,790 33 LCS In-Service Modernization A U 188,254 189,458 189,458 34 Small & Medium UUV A U 48,780 7,000 UNCLASSIFIED 345,086 352,086 Volume 3 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 121,130 28 Standard Boats A U 97,746 97,746 A U 492,100 492,100 50,000 171,130 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 30,565 30,565 31 LCS MCM Mission Modules U 65,113 65,113 32 LCS SUW Mission Modules U 1,719 1,719 33 LCS In-Service Modernization A U 315,272 315,272 34 Small & Medium UUV A U 110,955 110,955 UNCLASSIFIED Volume 3 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 35 Large UUV A U 36 Extra Large UUV A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty 3,313 Cost 3,313 Logistic Support 37 LSD Midlife & Modernization U Total Ships support equipment 49,044 4,079 6,488,639 5,839,954 4,079 3,510,954 9,350,908 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 7,402 39 AN/SQQ-89 Surf ASW Combat System A U 134,635 144,425 144,425 40 SSN Acoustic Equipment A U 458,824 498,597 498,597 41 Undersea Warfare Support Equipment A U 14,247 UNCLASSIFIED Volume 3 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 35 Large UUV A U 222,998 222,998 36 Extra Large UUV A U 135,802 135,802 U 240 240 Logistic Support 37 LSD Midlife & Modernization Total Ships support equipment 7,696,789 50,000 7,746,789 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 39 AN/SQQ-89 Surf ASW Combat System A U 142,355 142,355 40 SSN Acoustic Equipment A U 454,161 454,161 41 Undersea Warfare Support Equipment A U UNCLASSIFIED Volume 3 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 51,514 56,482 56,482 43 SSTD A U 9,647 14,915 14,915 44 Fixed Surveillance System A U 405,854 352,312 45 SURTASS A U 45,975 31,169 31,169 A U 190,011 422,704 422,704 A U 361,915 379,908 379,908 U 4,680 13,008 13,008 143,000 495,312 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 3 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 68,881 68,881 43 SSTD A U 14,857 14,857 44 Fixed Surveillance System A U 490,548 490,548 45 SURTASS A U 72,190 72,190 A U 653,483 653,483 A U 701,667 701,667 U 8,652 8,652 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 3 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 49 Cooperative Engagement Capability B U 26,644 26,648 26,648 50 Naval Tactical Command Support System (NTCSS) A U 13,614 7,972 7,972 51 ATDLS A U 68,458 58,739 58,739 52 Navy Command and Control System (NCCS) U 3,645 3,489 3,489 53 Minesweeping System Replacement A U 16,808 16,426 16,426 54 Navstar GPS Receivers (SPACE) A U 37,964 45,701 45,701 55 American Forces Radio and TV Service A U 3,802 304 304 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 90,586 97,262 97,262 57 Afloat ATC Equipment A U 74,458 72,104 72,104 58 ID Systems A U 59,602 52,171 52,171 UNCLASSIFIED Volume 3 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 49 Cooperative Engagement Capability B U 33,932 33,932 50 Naval Tactical Command Support System (NTCSS) A U 10,108 10,108 51 ATDLS A U 52,758 52,758 52 Navy Command and Control System (NCCS) U 16,167 16,167 53 Minesweeping System Replacement A U 14,879 14,879 54 Navstar GPS Receivers (SPACE) A U 43,097 43,097 55 American Forces Radio and TV Service A U 289 289 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 83,057 83,057 57 Afloat ATC Equipment A U 62,581 62,581 58 ID Systems A U 35,620 35,620 UNCLASSIFIED Volume 3 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost U 7,287 5,105 5,105 U 42,326 60,058 60,058 U 8,479 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 66,470 64,901 64,901 63 Intelligence Surveillance and Reconnaissance (ISR) A U 16,946 12,112 12,112 64 CANES U 439,977 534,324 534,324 65 RADIAC U 38,688 31,289 31,289 66 CANES-Intell U 50,654 46,281 46,281 67 GPETE U 32,005 33,395 33,395 68 MASF U 24,361 13,205 13,205 A A UNCLASSIFIED Volume 3 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 2,976 2,976 U 54,487 54,487 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 48,262 48,262 63 Intelligence Surveillance and Reconnaissance (ISR) A U 11,824 11,824 64 CANES U 493,046 493,046 65 RADIAC U 38,000 38,000 66 CANES-Intell U 43,028 43,028 67 GPETE U 31,462 31,462 68 MASF U 5,822 5,822 U A A UNCLASSIFIED Volume 3 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 69 Integ Combat System Test Facility A U 6,709 11,493 11,493 70 EMI Control Instrumentation A U 4,081 3,687 3,687 71 In-Service Radars and Sensors A U 262,890 249,656 249,656 Shipboard Communications 72 Battle Force Tactical Network A U 104,019 106,583 106,583 73 Shipboard Tactical Communications A U 24,602 20,900 20,900 74 Ship Communications Automation A U 127,321 162,075 162,075 75 Communications Items Under $5M A U 9,209 11,138 11,138 Submarine Communications 76 Submarine Broadcast Support A U 129,467 113,115 113,115 77 Submarine Communication Equipment A U 68,334 84,584 84,584 UNCLASSIFIED Volume 3 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 69 Integ Combat System Test Facility A U 6,454 6,454 70 EMI Control Instrumentation A U 3,435 3,435 71 In-Service Radars and Sensors A U 338,946 338,946 Shipboard Communications 72 Battle Force Tactical Network A U 125,661 125,661 73 Shipboard Tactical Communications A U 50,350 50,350 74 Ship Communications Automation A U 156,605 156,605 75 Communications Items Under $5M A U 15,097 15,097 Submarine Communications 76 Submarine Broadcast Support A U 173,069 173,069 77 Submarine Communication Equipment A U 88,071 88,071 UNCLASSIFIED Volume 3 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 59,732 62,943 62,943 U 162,928 63,433 63,433 220,453 220,453 A U A U 4,551 3,389 3,389 Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 195,063 191,239 191,239 83 MIO Intel Exploitation Team A U 1,100 1,122 1,122 Cryptologic Equipment UNCLASSIFIED Volume 3 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 57,961 57,961 U 57,768 57,768 A U 202,305 202,305 A U Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 349,099 349,099 83 MIO Intel Exploitation Team A U 1,063 1,063 Cryptologic Equipment UNCLASSIFIED Volume 3 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty A U 15,506 Cost Qty Cost FY 2026 Total Qty Cost 7,841 7,841 58,764 58,764 Other Electronic Support 85 DON TRR-1 (Afloat) A U 10,370 86 DON UAS Video 5 (Afloat) A U 5,370 87 USN Ashore/Shipboard CONOPS Verification and A U 6,586 88 USN Training Ranges - Codify CONOPS/TTPs A U 1,375 89 USN Training Ranges - Spectrum Sensing A U 1,000 90 USN EME Sensing and Monitoring A U 120 91 Coast Guard Equipment A U 49,523 A U 18,486 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 3 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2027 Discretionary Request Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7,419 7,419 Other Electronic Support 85 DON TRR-1 (Afloat) A U 86 DON UAS Video 5 (Afloat) A U 87 USN Ashore/Shipboard CONOPS Verification and A U 88 USN Training Ranges - Codify CONOPS/TTPs A U 89 USN Training Ranges - Spectrum Sensing A U 90 USN EME Sensing and Monitoring A U 91 Coast Guard Equipment A U 67,106 67,106 A U 57,568 57,568 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 3 - xxxvi === page 39 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Total Communications and electronics equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 4,075,820 4,467,421 143,000 4,610,421 80,000 369,908 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 353,441 289,908 Aircraft Support Equipment 94 Minotaur A U 5,431 5,191 5,191 95 Weapons Range Support Equipment A U 138,062 123,435 123,435 96 Aircraft Support Equipment A U 121,727 82,039 82,039 97 Advanced Arresting Gear (AAG) A U 2,244 4,484 4,484 98 Electromagnetic Aircraft Launch System (EMALS A U 14,702 16,294 16,294 99 Meteorological Equipment A U 17,982 13,806 13,806 UNCLASSIFIED Volume 3 - xxxvii === page 40 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Total Communications and electronics equipment Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 5,446,166 5,446,166 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 300,151 300,151 Aircraft Support Equipment 94 Minotaur A U 4,831 4,831 95 Weapons Range Support Equipment A U 119,900 119,900 96 Aircraft Support Equipment A U 69,065 69,065 97 Advanced Arresting Gear (AAG) A U 23,551 23,551 98 Electromagnetic Aircraft Launch System (EMALS A U 36,908 36,908 99 Meteorological Equipment A U 7,477 7,477 UNCLASSIFIED Volume 3 - xxxviii === page 41 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 100 Airborne MCM A U 10,643 9,643 9,643 101 Aviation Support Equipment A U 99,656 111,334 111,334 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 119,561 186,909 186,909 883,449 843,043 Total Aviation support equipment 80,000 923,043 Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,712 7,358 7,358 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 226 209 209 105 Ship Missile Support Equipment A U 431,830 527,292 527,292 106 Tomahawk Support Equipment A U 98,921 107,709 107,709 FBM Support Equipment UNCLASSIFIED Volume 3 - xxxix === page 42 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 100 Airborne MCM A U 9,507 9,507 101 Aviation Support Equipment A U 116,873 116,873 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 211,216 211,216 899,479 899,479 Total Aviation support equipment Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,962 6,962 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 195 195 105 Ship Missile Support Equipment A U 431,069 431,069 106 Tomahawk Support Equipment A U 116,208 116,208 FBM Support Equipment UNCLASSIFIED Volume 3 - xl === page 43 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty 107 CPS Support Equipment A U 108 Strategic Missile Systems Equip A U 320,691 491,179 Cost FY 2026 Total Qty 67,264 Cost 67,264 9,180 500,359 ASW Support Equipment 109 SSN Combat Control Systems A U 153,237 102,954 102,954 110 ASW Support Equipment A U 25,362 25,721 25,721 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 52,885 17,758 17,758 112 Directed Energy Systems A U 3,817 2,976 2,976 113 Items Less Than $5 Million A U 3,193 3,635 3,635 A U 75,614 50,741 50,741 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 3 - xli === page 44 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 107 CPS Support Equipment A U 188,430 188,430 108 Strategic Missile Systems Equip A U 327,941 327,941 ASW Support Equipment 109 SSN Combat Control Systems A U 165,416 165,416 110 ASW Support Equipment A U 25,105 25,105 48,252 48,252 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 112 Directed Energy Systems A U 113 Items Less Than $5 Million A U 2,592 2,592 A U 606,241 606,241 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 3 - xlii === page 45 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 80,236 Cost Qty Cost FY 2026 Total Qty 77,889 Cost 77,889 179,960 177,885 8,200 186,085 1,432,684 1,660,570 17,380 1,677,950 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,751 3,825 3,825 118 General Purpose Trucks A U 5,795 5,489 5,489 119 Trailers A U 120 Construction & Maintenance Equip A U 76,983 105,592 105,592 121 Fire Fighting Equipment A U 23,006 27,675 27,675 122 Tactical Vehicles B U 36,355 37,262 37,262 123 Amphibious Equipment A U 6,454 38,073 38,073 200 UNCLASSIFIED 200 Volume 3 - xliii === page 46 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2027 Mandatory Request Qty 73,681 Cost FY 2027 Total Qty Cost 73,681 218,181 218,181 2,210,273 2,210,273 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,567 3,567 118 General Purpose Trucks A U 4,801 4,801 119 Trailers A U 120 Construction & Maintenance Equip A U 91,269 91,269 121 Fire Fighting Equipment A U 17,107 17,107 122 Tactical Vehicles B U 46,796 46,796 123 Amphibious Equipment A U 53,916 53,916 UNCLASSIFIED Volume 3 - xliv === page 47 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 124 Pollution Control Equipment A U 3,924 4,009 4,009 125 Items less than $5 Million A U 103,014 127,086 127,086 126 Physical Security Vehicles A U 1,301 1,297 1,297 260,583 350,308 Total Civil engineering support equipment 200 350,508 40,800 40,800 Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 56,585 128 First Destination Transportation A U 6,463 6,203 129 Special Purpose Supply Systems A U Total Supply support equipment 985,996 666,618 1,049,044 672,821 5,341 3,480 6,203 666,618 40,800 713,621 Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED 3,480 Volume 3 - xlv === page 48 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 124 Pollution Control Equipment A U 3,586 3,586 125 Items less than $5 Million A U 131,449 131,449 126 Physical Security Vehicles A U 998 998 353,489 353,489 Total Civil engineering support equipment Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 67,828 67,828 128 First Destination Transportation A U 4,732 4,732 129 Special Purpose Supply Systems A U 323,644 323,644 396,204 396,204 10,608 10,608 Total Supply support equipment Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED Volume 3 - xlvi === page 49 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost A U 43,126 73,631 73,631 Command Support Equipment 132 Command Support Equipment A U 29,698 34,249 34,249 133 Medical Support Equipment A U 10,122 24,256 24,256 135 Naval MIP Support Equipment A U 6,590 8,810 136 Operating Forces Support Equipment A U 17,941 16,567 16,567 137 C4ISR Equipment A U 33,606 36,945 36,945 138 Environmental Support Equipment A U 47,499 42,860 42,860 139 Physical Security Equipment A U 138,799 166,577 166,577 140 Enterprise Information Technology A U 42,026 42,363 42,363 UNCLASSIFIED 21,946 30,756 Volume 3 - xlvii === page 50 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost A U 331,016 331,016 Command Support Equipment 132 Command Support Equipment A U 55,202 55,202 133 Medical Support Equipment A U 54,862 54,862 135 Naval MIP Support Equipment A U 5,213 5,213 136 Operating Forces Support Equipment A U 15,107 15,107 137 C4ISR Equipment A U 33,975 33,975 138 Environmental Support Equipment A U 60,467 60,467 139 Physical Security Equipment A U 218,037 218,037 140 Enterprise Information Technology A U 40,490 40,490 UNCLASSIFIED Volume 3 - xlviii === page 51 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Other 141 Cancelled Account Adjustments A U 46 142 Next Generation Enterprise Service A U 226,479 185,755 185,755 143 Cyberspace Activities A U 2,195 2,239 2,239 Classified Programs 999 Classified Programs U 16,134 62,991 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 Total Spares and repair parts 1,007,643 159,138 1,987,827 2,146,965 Total Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Personnel and command support equipment 62,991 Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED Volume 3 - xlix === page 52 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Other 141 Cancelled Account Adjustments A U 142 Next Generation Enterprise Service A U 223,647 223,647 143 Cyberspace Activities A U 7,131 7,131 Classified Programs 999 Classified Programs U 42,813 42,813 1,098,568 1,098,568 765,711 765,711 Total Spares and repair parts 765,711 765,711 Total Other Procurement, Navy 18,866,679 Total Personnel and command support equipment Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED 50,000 18,916,679 Volume 3 - l === page 53 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 3 - li === page 54 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 3 - lii === page 55 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 UNCLASSIFIED Volume 3 - liii === page 56 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 UNCLASSIFIED Volume 3 - liv === page 57 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 UNCLASSIFIED Volume 3 - lv === page 58 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 3 - lvi === page 59 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 3 - lvii === page 60 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 127 06 01 7025 Supply Equipment.............................................................................................................................. Volume 5 - 121 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 UNCLASSIFIED Volume 3 - lviii === page 61 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 129 06 01 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 7069 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 143 07 05 8645 Cyberspace Activities.........................................................................................................................Volume 5 - 315 UNCLASSIFIED Volume 3 - lix === page 62 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 3 - lx === page 63 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 UNCLASSIFIED Volume 3 - lxi === page 64 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 EOD Equipment 5509 111 04 06................... Volume 4 - 141 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 UNCLASSIFIED Volume 3 - lxii === page 65 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 ID Systems 2851 58 02 09................... Volume 2 - 471 In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 UNCLASSIFIED Volume 3 - lxiii === page 66 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Minotaur 3640 94 03 03..................... Volume 3 - 31 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 UNCLASSIFIED Volume 3 - lxiv === page 67 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 RADIAC 2920 65 02 10................... Volume 2 - 579 Reactor Components 1020 25 01 10................... Volume 1 - 491 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 SURTASS 2237 45 02 03................... Volume 2 - 143 UNCLASSIFIED Volume 3 - lxv === page 68 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 UNCLASSIFIED Volume 3 - lxvi === page 69 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 3 - lxvii === page 70 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - lxviii === page 71 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 3 - lxix === page 72 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - lxx === page 73 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minotaur 3640 94 03 03..................... Volume 3 - 31 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 3 - lxxi === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - lxxii === page 75 === Executive Summary for Other Procurement, Navy Table 1: FundingOverview Discretionary Mandatory Total BLI 0933 0946 0954 0954 0956 0970 0970 0981 1210 1445 1445 1611 1613 2225 3050 3415 4048 5358 5664 6007 7025 8114 9020 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 15,817,464 14,693,978 18,866,679 31,650 5,802,107 50,000 15,849,114 20,496,085 18,916,679 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title Readiness Readiness Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Readiness Readiness INDOPACOM Capabilities INDOPACOM Capabilities Readiness Shipbuilding Shipbuilding INDOPACOM Capabilities Low-Cost Weapons Low-Cost Weapons Munitions and Supply Chain Nuclear Readiness INDOPACOM Capabilities Shipbuilding INDOPACOM Capabilities Readiness FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 23,775 $ 7,875 $ $ $ $ $ $ $ $ 31,650 FY 2026 ($K) $ 65,400 $ 29,000 $ 1,950,714 $ $ 694,020 $ 20,148 $ 173 $ 7,400 $ 5,100 $ 117,600 $ 273,000 $ 345,086 $ 3,313 $ 143,000 $ $ $ 80,000 $ 9,180 $ 8,200 $ 200 $ 40,800 $ 21,946 $ 1,987,827 $ 5,802,107 FY 2027 ($K) $ $ $ $ 50,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 50,000 Volume 3 - lxxiii === page 76 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Other Procurement, Navy includes $18,866,679 thousand of discretionary and $50,000 thousand of mandatory for a total of $18,916,679 thousand. The mandatory funds support: Medium Uncrewed Surface Vessels (MUSV): The Navy’s FY 2027 mandatory budget request includes $50 million for the procurement of one vessel. The FY 2026 spend plan for Other Procurement, Navy includes $14,693,978 thousand of discretionary and $5,802,107 thousand of mandatory for a total of $20,496,085 thousand. The FY 2025 spend plan for Other Procurement, Navy includes $15,817,464 thousand of discretionary and $31,650 thousand of mandatory for a total of $15,849,114 thousand. Volume 3 - lxxiv === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 1: Sonobuoys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 3,669.174 3,669.174 3,669.174 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 353.441 353.441 353.441 289.908 289.908 289.908 300.151 - 0.000 - 300.151 - 0.000 - 300.151 0.000 300.151 300.151 300.151 642.254 642.254 642.254 671.786 671.786 671.786 703.187 703.187 703.187 To FY 2031 Complete 729.700 Continuing 729.700 729.700 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Sonobuoys are air launched expendable, electro-mechanical sensors designed to relay underwater sounds associated with ships and submarines to remote processors, critical to U.S. Navy Air Anti-Submarine Warfare (ASW) mission to achieve maritime supremacy against near peer threats. Sonobuoys, by type, are procured in quantity based on Fleet demand and to support combat stock levels set by modeling conducted as part of the annual Navy's Munitions Requirements Process (NMRP). The Sonobuoy program buys-to-budget based on actual fleet usage, forecasted usage and best negotiated pricing across each sonobuoy type. The annual NMRP model estimates inventory requirements for combat stock and all usage requirements for readiness, current operations and squadron training/test. Sonobuoys currently support the P-8 and H-60 platforms. The FY2026 spend plan for Sonobuoys - All Types includes $289,908 thousand of discretionary and $80,000 thousand of mandatory funds for a total of $369,908 thousand. The mandatory funds procure the following additional sonobuoy quantities: AN/SSQ-53 QTY 8,233; AN/SSQ-125B QTY 6,586 [P5 / Sonobuoys, All Types]: FY 2027 planned procurements reflect the on-going industrial base transition that began in FY 2024. The sonobuoy industrial base transitioned from a single source to a competitive environment with multiple vendors. While the transition has resulted in a more robust and resilient industrial base, it has also resulted in splitting USG annual procurements and higher unit costs. These are estimated based on an Independent Government Cost Estimate (IGCE) that uses historical unit prices adjusted for vendor base stand-up, learning curves, inflation, establishment of new supply chains germane to independent company designs, actual costs from competitive awards, and economical split of procurements across multiple vendors. [P5 / AN/SSQ-36 (BT) QZ001]: The AN/SSQ-36 Bathythermograph (BT) is a bathythermograph sonobuoy used to provide a vertical temperature profile of the ocean with respect to depth. The data is transmitted to aircraft to assist in the selection of hydrophone depths and tactics for localizing and tracking submarines and long-range forecasts of acoustic conditions in the ocean. [P5 / AN/SSQ-53 (DIFAR) QZ002]: The AN/SSQ-53 Directional Frequency Analysis and Recording (DIFAR) is a passive directional sonobuoy which provides acoustic bearing and frequency information used to detect, classify, and localize undersea targets of interest. [P5 / AN/SSQ-62 (DICASS) QZ004]: The AN/SSQ-62F Directional Command Active Sonobuoy System (DICASS) is a commandable, active acoustic directional sonobuoy that provides target bearing and range information. LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 1 of 30 P-1 Line #93 Volume 3 - 1 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 1: Sonobuoys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / AN/SSQ-101 (Multi-static Coherent Receiver) QZ006]: The AN/SSQ-101B Air Deployable Active Receiver (ADAR) is a commandable passive acoustic sonobuoy with a horizontal planar array that receives reflected energy. It is part of the family of multi-static active sensor systems. [P5 / AN/SSQ-125/125A (Multi-static Coherent Source) QZ010]: The AN/SSQ-125/125A Multi-static Active Coherent (MAC) Source is a commandable coherent active search sensor. It is part of the family of multi-static active sensor systems. [P5 / AN/SSQ-125B (Multi-static Coherent Source)]: The AN/SSQ-125B Multi-static Active Coherent (MAC) Source is a very complex commandable coherent active search sensor with additional classified capabilities. It is part of the family of multi-static active sensor systems. [P5 / AN/SSQ-145 (new buoy)]: AN/SSQ-145 (Multi-static Coherent Receiver): The AN/SSQ-145 Digital Directional Frequency Analysis and Recording (DIFAR) Vertical Line Array (DDVLA) sonobuoy receives reflected energy. It is part of the family of multi-static active sensor systems, and is the hardware that enables UnderSea Advantage Block 1 (USAB1). LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 2 of 30 P-1 Line #93 Volume 3 - 2 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 1: Sonobuoys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Sonobuoys, All Types P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 3,669.174 - / 353.441 - / 289.908 - / 300.151 - / 0.000 - / 300.151 - / 3,669.174 - / 353.441 - / 289.908 - / 300.151 - / 0.000 - / 300.151 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The level of sonobuoy procurement funding directly enables the Navy's overall Anti-submarine Warfare (ASW) mission and wartime readiness. The Air ASW program buys-to-budget based on actual fleet usage, fleet forecasted usage, and best negotiated pricing across all sonobuoy types. The Air ASW community continues to use passive capability combined with an increase in the more capable Multi-static Active Coherent (MAC) wide area search Concept of Operations (CONOPS), which uses the AN/SSQ-101 and AN/SSQ-125 family of systems. While the transition to MAC requires the procurement of more sophisticated sonobuoys, the resulting wide area search capability is more efficient and effective. The MAC capability provides the foundational Air ASW acoustic search capability for the P-8 Poseidon, and increasing the inventory of MAC sonobuoys is required to support the combatant commander's ASW mission execution requirements. This funding profile allows the Navy to prioritize and meet current operational forward presence requirements while building fleet commander deployment readiness levels in the ASW mission area. NOTES: 1. FY 2027 reflects the almost complete industrial base transition from single source with ERAPSCO Joint Venture to a competitive environment where previous ERAPSCO partners (Sparton and Ultra-Undersea Sensor Systems, Inc (USSI)) will each produce fully independent designs. Sparton and USSI will compete annually for USG orders via a competitive multiple award delivery order contract (MADOC). In the event only one vendor is qualified, the USG will use sole source contracts as necessary as bridge efforts to full competition. Future unit costs are estimated using an Independent Government Cost Estimate (IGCE) derived from prior year proposals and contract awards, new vendor base establishment, sonobuoy re-qualification efforts, future production learning curves, supply chain changes, and splitting quantities across multiple vendors. USG independent cost estimate utilizes split awards in order to preserve the health of the industrial base. Actual split will be dependent on company proposals for each annual delivery order. Additionally, production engineering and lot acceptance costs have increased based on increased effort associated with testing product from multiple vendors. Increased funding levels also support product acceptance test infrastructure at various locations and may be used to procure strategic critical parts, material and tooling to enable industry base surge during wartime/contingency operations and mitigate supply chain risks. FY 2026/FY 2027 begin the inclusion of substantial cost increases associated with stand up of a new air-launch Contractor Owned, Contractor Operated capability for lot acceptance test efforts due to sundown of the P-3 aircraft, scheduling conflicts and lack of availability of aircraft required to complete lot acceptance test events for sonobuoy delivery. Funding also supports product acceptance test infrastructure at various locations and may be used to procure strategic critical parts, material and tooling to enable industry base surge during wartime/contingency operations and mitigate supply chain risks. 2. Program buys-to-budget. New MADOC does not have maximum quantity limitations, maximizing industry capacity; ceiling is based on number of available vendors per buoy variant and price points based on quantity procured. Program seeks to achieve economies of scale by utilizing both Other Procurement Navy (OPN) and Foreign Military Sales (FMS) funds. Under the MADOC, production quantities will be split amongst qualified vendors for the health of the industrial base, reducing economic ordering quantities. 3. FY 2027 will continue competition of the AN/SSQ-36 and AN/SSQ-53 across two vendors. Unit costs assumed a split between two vendors to ensure health/viability of the industrial base, leading to loss of economical ordering quantities, higher unit prices and data from the past two years of competitive actions. FY 2027 reflects the first opportunity for a competitive approach to AN/SSQ-62. It is planned to be single sourced through FY 2026 as vendors continued to qualify independent buoy designs. FY 2027 will continue as a single source contract for the AN/SSQ-125B. FY 2025 and FY 2026 quantity and unit cost adjustments were a result of extensive qualification costs, learning curve reset for independent buoy designs and independent production lines. Program deferred AN/SSQ-101 buoy order to FY 2026 to better align AN/SSQ-101 and AN/SSQ-125 inventory levels and avoid demil expenditures; FY 2027 AN/SSQ-101 order will utilize FY 2025, FY 2026 and FY 2027 funds to optimize procurement strategy and gain economies of scale. As a result of the various contracting strategies, FY 2027 projected unit costs do not reflect traditional cost trends. LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 3 of 30 P-1 Line #93 Volume 3 - 3 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 1: Sonobuoys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 4. FY 2027 plans for multiple vendors for the AN/SSQ-62 and AN/SSQ-101 sonobuoys. As of FY 2026, AN/SSQ-125 production plans to shift solely to AN/SSQ-125B with only one vendor assumed in FY 2026 with an escalated unit cost as a result of a higher complexity sonobuoy with additional classified capabilities. AN/SSQ-101 sonobuoy order has been deferred until 1Q FY 2027 to align Multi-static active coherent AN/SSQ-125B and AN/SSQ-101B inventory levels as the 2 buoy types are deployed in pairs. 5. FY 2027 request for Sonobuoys will utilize competitive contracts for all variants, with the exception of the AN/SSQ-125B. The determination of ordering quantities for FY 2027 will be based on operational expenditure data, the current inventory of sonobuoys, and the vendors manufacturing capacities for each variant. 6. New AN/SSQ-145 multi-static active coherent receiver sonobuoy will complement AN/SSQ-101 sonobuoy inventories beginning in FY29. Program has increased AN/SSQ-125B procurement quantities and deferred AN/SSQ-101 procurement to plan for the onset of the AN/SSQ-145 sonobuoy in FY29 and balance inventory as the 2 buoy types are deployed in pairs. OOC: FY 2025 includes $28.616M for the OOC budget request. FY 2026 includes $5.050M for the OOC budget request. FY 2027 includes $5.051M for the OOC budget request to replenish FY24 operational expenditures. Sonobuoy inventory is depleted and falls short of the Total Munitions Requirement adversely affecting overseas operations. LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 4 of 30 P-1 Line #93 Volume 3 - 4 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Sonobuoys, All Types MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 3,669.174 Less PY Advance Procurement ($ in Millions) 353.441 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 300.151 - 0.000 - 289.908 300.151 - 300.151 - 353.441 FY 2027 Total 0.000 - 289.908 - 3,669.174 - - 353.441 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 289.908 - 3,669.174 FY 2027 Base - 300.151 - 300.151 - 0.000 300.151 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Sonobuoys (Common) Cost Recurring Cost 1.1.1) AN/SSQ-36 (BT) QZ001 (†) (1) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) (2) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) (3) 575.01 58,653 33.726 1,001.00 4,000 4.004 1,131.00 1,434 1.622 1,154.75 1,502 1.734 - - - 1,154.75 1,502 1.734 842.44 1,361,362 1,146.869 1,516.28 120,118 182.133 1,567.29 122,570 192.103 1,601.77 125,214 200.564 - - - 1,601.77 125,214 200.564 1,776.24 214,015 380.143 2,852.60 18,828 53.709 3,038.50 19,000 57.732 3,144.85 10,000 31.449 - - - 3,144.85 10,000 31.449 Subtotal: Recurring Cost - - 1,560.738 - - 239.846 - - 251.457 - - 233.747 - - - - - 233.747 Subtotal: Hardware Sonobuoys (Common) Cost - - 1,560.738 - - 239.846 - - 251.457 - - 233.747 - - - - - 233.747 490 3.042 800 4.966 - - - 800 4.966 - - - - - - - - - 1,469 15.254 3,644 38.634 - - - 3,644 38.634 - 18.296 - 43.600 - - - - 43.600 Hardware - Sonobuoys (Multistatic) Cost Recurring Cost 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 (†) (4) 2.1.2) AN/ SSQ-125/125A (Multi-static Coherent Source) QZ010 149,643 560.887 6,208.10 1,738 10.790 5,047.46 136,585 689.407 5,552.40 12,511 69.466 10,170.24 1,445 14.696 10,170.47 1,801 18.317 - 1,264.990 - 98.573 6,208.10 - 6,208.10 - 6,208.10 - (†) (5) 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) 3,748.17 (†) (6) Subtotal: Recurring Cost - LI 4048 - Sonobuoys - All Types Navy - 10,384.05 - UNCLASSIFIED Page 5 of 30 10,602.11 - P-1 Line #93 10,602.11 - Volume 3 - 5 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Sonobuoys, All Types MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Hardware Sonobuoys (Multistatic) Cost FY 2025 Total Cost Qty (Each) ($ M) - - 3.1.1) SUS MK84 QZ012 286.50 Subtotal: Recurring Cost - Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1,264.990 - - 98.573 - - 18.296 - - 43.600 - - - - - 43.600 20,454 5.860 - - - - - - - - - - - - - - - - 5.860 - - - - - - - - - - - - - - - - - 5.860 - - - - - - - - - - - - - - - (7) - - 39.554 - - 4.020 - - 6.519 - - 8.019 - - - - - 8.019 4.1.2) Multi-static QZ860 - - 30.034 - - 4.618 - - 7.117 - - 8.129 - - - - - 8.129 4.1.3) Other QZ860 - - 0.152 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 69.740 - - 8.638 - - 13.636 - - 16.148 - - - - - 16.148 - - 69.740 - - 8.638 - - 13.636 - - 16.148 - - - - - 16.148 Hardware - Sonobuoys (Other) Cost Recurring Cost Subtotal: Hardware Sonobuoys (Other) Cost Hardware - Acceptance Testing Cost Recurring Cost 4.1.1) Common QZ860 Subtotal: Hardware Acceptance Testing Cost Hardware - Prior Years Cost Non Recurring Cost 5.1.1) Prior Years - - 708.043 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 708.043 - - - - - - - - - - - - - - - Subtotal: Hardware - Prior Years Cost - - 708.043 - - - - - - - - - - - - - - - 6.1) Common QZ830 - - 34.589 - - 3.181 - - 3.248 - - 3.316 - - - - - 3.316 6.2) Multi-static QZ830 - - 25.086 - - 3.203 - - 3.271 - - 3.340 - - - - - 3.340 6.3) Other QZ830 - - 0.128 - - - - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 59.803 - - 6.384 - - 6.519 - - 6.656 - - - - - 6.656 Gross/Weapon System Cost - - 3,669.174 - - 353.441 - - 289.908 - - 300.151 - - 0.000 - - 300.151 Support - Production Engineering Cost Remarks: [Hardware] Actual quantities between the various sonobuoy types may adjust for Fleet requirements. Hardware funds may be realigned to support necessary Engineering Investigations and production Engineering Change Proposals. LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 6 of 30 P-1 Line #93 Volume 3 - 6 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Sonobuoys, All Types MDAP/MAIS Code: [Hardware] Sonobuoys under prior subheads are not included in Prior Years amount. (†) indicates the presence of a P-5a Footnotes: (1) AN/SSQ-36 has transitioned to a competitive multiple award delivery order contract. Unit costs reflect negotiated prices and include costs associated with establishment of a new vendor base, extensive sonobuoy qualification costs, future production learning curves associated with vendors producing independent sonobuoy designs. Future quantities will be procured to global floor level based on inventory objectives and decrease DEMIL expenditures. (2) Program buys to budget. Competitive multiple award delivery order contract (MADOC) does not have maximum quantity limitations; ceiling is based on number of available vendors per buoy variant and price points based on quantity procured. Program seeks to achieve economies of scale by utilizing both Other Procurement, Navy (OPN) funds and Foreign Military Sales (FMS) funds. FY 2027 continues the competitive environment that began in FY 2025 whereby unit costs consist of new vendor base and sonobuoy re-qualification costs, production learning curves, supply chain demands and vendors splitting production quantities to balance best price and ensure health/viability of industrial base, leading to loss of EOQ (economical ordering quantities). (3) AN/SSQ-62 MADOC contract to sole source vendor planned late 4Q FY 2026 for full rate production. FY 2027 will have 2 qualified vendors splitting production quantities through MADOC/OTA contract vehicles to ensure industrial base health/viability, potentially resulting in loss of EOQ. FY 2028 will continue the competitive approach for the AN/SSQ-62s. (4) FY 2027 reflects the first competition for the AN/SSQ-101, as a result of combining FY 2025, FY 2026 and FY 2027 orders due to independent vendor qualification timelines. MADOC/OTA contract vehicles will be utilized to achieve greater economies of scale and ensure health/viability of the industrial base. Actual split will be dependent on company proposals for each annual delivery order. (5) FY 2025 legacy 125 MHDC order was combined with Foreign Military Sales (FMS) orders to procure maximum quantities achieving reduced unit costs with economical ordering quantities. AN/SSQ-125 production shifts solely to the more complex and expensive AN/SSQ-125B sonobuoy required for additional search detection capability. (6) As of FY 2026, AN/SSQ-125 production shifts solely to AN/SSQ-125B with only one vendor an escalated unit cost as a result of additional classified capabilities. Program plans to procure AN/SSQ-125B order with FY2024, FY 2025 and FY 2026 funding to accelerate inventory goals, achieve economies of scale and better unit cost for this very complex multi-static active coherent sonobuoy with additional search detection capability. FY 2027 continues the sole source contracting approach for AN/SSQ-125B. (7) FY 2026/FY 2027 begin the inclusion of substantial cost increases associated with stand up of a new air-launch Contractor Owned, Contractor Operated capability for lot acceptance test efforts due to sundown of the P-3 aircraft, scheduling conflicts and lack of availability of aircraft required to complete lot acceptance test events for sonobuoy delivery. LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 7 of 30 P-1 Line #93 Volume 3 - 7 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 O O C FY Contractor and Location 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR (†) 2022 ERAPSCO / Columbia City IN SS / IDIQ (†) 2023 ERAPSCO / Columbia City IN SS / IDIQ (†) 2024 VARIOUS / VARIOUS (†) 2025 (†) 2026 (†) (†) 1.1.1) AN/SSQ-36 (BT) QZ001 (†) 1.1.1) AN/SSQ-36 (BT) QZ001 ✓ (†) 1.1.1) AN/SSQ-36 (BT) QZ001 (†) 1.1.1) AN/SSQ-36 (BT) QZ001 ✓ (†) 1.1.1) AN/SSQ-36 (BT) QZ001 (†) 1.1.1) AN/SSQ-36 (BT) QZ001 ✓ 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.1) AN/SSQ-36 (BT) QZ001 1.1.2) AN/SSQ-53 (DIFAR) (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) ✓ 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) ✓ 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) ✓ 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Method/Type or Funding Vehicle Cost Elements QZ002 P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types (†) LI 4048 - Sonobuoys - All Types Navy Location of PCO Award Date Date of First Delivery Jul 2019 Jul 2020 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2,304 544.72 Y Aug 2017 Jul 2020 677 544.72 Y Aug 2017 Mar 2021 7,253 464.49 Y Aug 2017 Mar 2021 62 464.49 Y Aug 2017 Dec 2020 Dec 2021 5,865 490.65 Y Aug 2017 Dec 2020 Dec 2021 424 490.65 Y Aug 2017 NAVAIR Dec 2021 Dec 2022 6,289 500.46 Y Aug 2017 NAVAIR Dec 2022 Dec 2023 7,017 511.49 Y Aug 2017 C / FFP NAVAIR Apr 2025 Apr 2026 2,394 1,001.00 Y Dec 2024 VARIOUS / VARIOUS C / FFP NAVAIR Apr 2025 Apr 2026 4,000 1,001.00 Y Dec 2024 VARIOUS / VARIOUS C / FFP NAVAIR Dec 2025 Dec 2026 1,434 1,131.00 Y Aug 2025 2027 VARIOUS / VARIOUS C / FFP NAVAIR Dec 2026 Dec 2027 1,502 1,154.75 Y Aug 2026 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 69,388 832.01 Y Aug 2017 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 18,244 832.01 Y Aug 2017 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 Mar 2021 126,858 791.07 Y Aug 2017 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 Mar 2021 1,302 791.07 Y Aug 2017 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 119,568 825.96 Y Aug 2017 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 3,816 825.96 Y Aug 2017 2022 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2021 Dec 2022 123,467 823.69 Y Aug 2017 2023 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2022 Dec 2023 146,015 845.65 Y Aug 2017 2024 VARIOUS / VARIOUS SS / FFP NAVAIR Aug 2024 Aug 2025 79,768 1,674.00 Y Dec 2021 2025 VARIOUS / VARIOUS C / FFP NAVAIR Jun 2025 Jun 2026 120,118 1,516.28 Y Feb 2025 UNCLASSIFIED Page 8 of 30 P-1 Line #93 Volume 3 - 8 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 O O C Cost Elements 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.2) AN/SSQ-53 (DIFAR) QZ002 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) ✓ 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) ✓ 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) ✓ 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 1.1.3) AN/SSQ-62 (DICASS) QZ004 (†) 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 ✓ 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 LI 4048 - Sonobuoys - All Types Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Item Number / Title [DODIC]: 1 / Sonobuoys, All Types FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery (Each) 2026 VARIOUS / VARIOUS C / FFP NAVAIR Mar 2026 Mar 2027 122,570 1,567.29 Y Feb 2026 2027 VARIOUS / VARIOUS C / FFP NAVAIR Mar 2027 Mar 2028 125,214 1,601.77 Y Dec 2026 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 23,051 1,605.51 Y Aug 2017 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 1,449 1,605.51 Y Aug 2017 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 Mar 2021 22,553 1,644.00 Y Aug 2017 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 Mar 2021 96 1,644.00 Y Aug 2017 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 19,905 1,675.72 Y Aug 2017 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 2,550 1,675.72 Y Aug 2017 2022 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2021 Dec 2022 24,881 1,750.27 Y Aug 2017 2023 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2022 Dec 2023 24,493 1,749.76 Y Aug 2017 2024 VARIOUS / VARIOUS SS / FFP NAVAIR Jun 2024 Jun 2025 10,708 2,820.82 Y Jan 2024 2025 VARIOUS / VARIOUS SS / FFP NAVAIR Sep 2025 Sep 2026 18,828 2,852.60 Y Feb 2025 2026 VARIOUS / VARIOUS SS / FFP NAVAIR Jun 2026 Jun 2027 19,000 3,038.50 Y Mar 2026 2027 VARIOUS / VARIOUS SS / FFP NAVAIR Jun 2027 Jun 2028 10,000 3,144.85 Y Dec 2026 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 14,414 3,043.05 Y Aug 2017 2019 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Jul 2019 Jul 2020 76 3,043.05 Y Aug 2017 2020 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Mar 2020 Mar 2021 17,123 2,962.25 Y Aug 2017 UNCLASSIFIED Page 9 of 30 P-1 Line #93 Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date Volume 3 - 9 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 O O C FY ✓ 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 ✓ 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.1) AN/SSQ-101 (Multi-static (†) Coherent Receiver) QZ006 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 ✓ 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 ✓ 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 ✓ 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 LI 4048 - Sonobuoys - All Types Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Contractor and Location Method/Type or Funding Vehicle 2020 ERAPSCO / Columbia City IN 2021 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Location of PCO Award Date Date of First Delivery SS / IDIQ NAVAIR Mar 2020 Mar 2021 236 2,962.25 Y Aug 2017 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 15,059 3,448.55 Y Aug 2017 2021 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2020 Dec 2021 2,526 3,448.55 Y Aug 2017 2022 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2021 Dec 2022 25,514 4,179.29 Y Aug 2017 2023 ERAPSCO / Columbia City IN SS / IDIQ NAVAIR Dec 2022 Dec 2023 23,366 4,481.10 Y Aug 2017 2025 VARIOUS / VARIOUS SS / FFP NAVAIR Sep 2026 Sep 2027 1,738 6,208.10 Y Apr 2026 2026 VARIOUS / VARIOUS C / FFP NAVAIR Dec 2026 Dec 2027 490 6,208.10 Y Apr 2026 2027 VARIOUS / VARIOUS C / FFP NAVAIR Jun 2027 Jun 2028 800 6,208.10 Y Feb 2027 2019 Various / Various C / FFP NAVAIR Dec 2018 Dec 2019 9,479 7,380.22 Y Aug 2017 2019 Various / Various C / FFP NAVAIR Dec 2018 Dec 2019 55 7,380.22 Y Aug 2017 2020 Various / Various C / FFP NAVAIR Jul 2020 Jul 2021 25,100 4,502.98 Y Aug 2019 2020 Various / Various C / FFP NAVAIR Jul 2020 Jul 2021 219 4,502.98 Y Aug 2019 2021 Various / Various C / FFP NAVAIR Dec 2020 Dec 2021 19,032 4,124.80 Y Aug 2017 2021 Various / Various C / FFP NAVAIR Dec 2020 Dec 2021 2,973 4,124.80 Y Aug 2017 2022 Various / Various C / FFP NAVAIR Dec 2021 Dec 2022 3,555 9,063.59 Y Aug 2017 2023 Various / Various C / FFP NAVAIR Dec 2022 Dec 2023 2,096 9,132.13 Y Aug 2017 2024 VARIOUS / VARIOUS SS / FFP NAVAIR Mar 2024 Mar 2025 20,286 5,805.67 Y May 2023 UNCLASSIFIED Page 10 of 30 P-1 Line #93 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 3 - 10 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 O O C Cost Elements 2.1.2) AN/SSQ-125/125A (Multi- (†) static Coherent Source) QZ010 2.1.3) AN/SSQ-125B (Multi-static (†) Coherent Source) 2.1.3) AN/SSQ-125B (Multi-static (†) Coherent Source) 2.1.3) AN/SSQ-125B (Multi-static (†) Coherent Source) 2.1.3) AN/SSQ-125B (Multi-static (†) Coherent Source) (†) P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Item Number / Title [DODIC]: 1 / Sonobuoys, All Types FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2025 Various / Various SS / FFP NAVAIR Mar 2025 Mar 2026 12,511 5,552.40 Y May 2023 2024 VARIOUS / TBD C / TBD ** NO PCO ** Dec 2025 Dec 2026 1,445 10,170.47 Y Jul 2025 2025 VARIOUS / TBD SS / FFP NAVAIR Dec 2025 Dec 2026 1,801 10,170.47 Y Jul 2025 2026 VARIOUS / TBD SS / FFP NAVAIR Feb 2026 Feb 2027 1,469 10,384.05 Y Jul 2025 2027 VARIOUS / TBD SS / FFP NAVAIR Jan 2027 Jan 2028 3,644 10,602.11 Y Jul 2026 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 11 of 30 P-1 Line #93 Volume 3 - 11 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R J U L A U G S E P B A L A N C E 1.704 Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 .000 2.304 A - - - - - - - - - - - - .200 .200 .200 1 2019 NAVY .677 .000 .677 A - - - - - - - - - - - - .225 .225 .227 .000 1 2020 NAVY 7.253 .000 7.253 A - - - - - - - 7.253 1 2020 NAVY .062 .000 .062 A - - - - - - - 1 2021 NAVY 5.865 .000 5.865 1 2021 NAVY .424 .000 .424 .424 1 2022 NAVY 6.289 .000 6.289 6.289 1 2023 NAVY 7.017 .000 7.017 7.017 2 2024 NAVY 2.394 .000 2.394 2.394 2 2025 NAVY 4.000 .000 4.000 4.000 2 2026 NAVY 1.434 .000 1.434 1.434 2 2027 NAVY 1.502 .000 1.502 1.502 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .062 5.865 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 .000 69.388 A - - - - - - - - - - - - 3.053 8.000 8.300 50.035 3 2019 NAVY 18.244 .000 18.244 A - - - - - - - - - - - - 1.000 1.500 2.250 13.494 3 2020 NAVY 126.858 .000 126.858 A - - - - - - - 3 2020 NAVY 1.302 .000 A - - - - - - - 3 2021 NAVY 119.568 3 2021 NAVY 3.816 3.816 3.816 3 2022 NAVY 123.467 .000 123.467 123.467 3 2023 NAVY 146.015 .000 146.015 146.015 4 2024 NAVY 79.768 .000 79.768 79.768 4 2025 NAVY 120.118 .000 120.118 120.118 4 2026 NAVY 122.570 .000 122.570 122.570 4 2027 NAVY 125.214 .000 125.214 125.214 1.1.3) AN/SSQ-62 (DICASS) QZ004 1.302 .000 119.568 .000 126.858 1.302 119.568 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 .000 23.051 A - - - - - - - - - - - - 2.563 2.561 2.561 15.366 5 2019 NAVY 1.449 .000 A - - - - - - - - - - - - .161 .161 .161 .966 5 2020 NAVY 22.553 .000 22.553 A - - - - - - - 22.553 1.449 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 12 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT B A L A N C E Fiscal Year 2020 Calendar Year 2019 Calendar Year 2020 O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 5 2021 NAVY 19.905 .000 19.905 5 2021 NAVY 2.550 .000 2.550 2.550 5 2022 NAVY 24.881 .000 24.881 24.881 5 2023 NAVY 24.493 .000 24.493 24.493 6 2024 NAVY 10.708 .000 10.708 10.708 6 2025 NAVY 18.828 .000 18.828 18.828 6 2026 NAVY 19.000 .000 19.000 19.000 6 2027 NAVY 10.000 .000 10.000 ✓ PROC QTY .000 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R .096 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 A P R A - M A Y - J U N - J U L - A U G - S E P - - .096 19.905 10.000 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 7 2019 NAVY .076 .000 14.414 A - - - - - - - - - - - - 1.614 1.600 1.600 .000 A - - - - - - - - - - - - .009 .009 .009 7 2020 NAVY 17.123 .049 .000 17.123 A - - - - - - - 17.123 7 2020 NAVY .236 7 2021 NAVY 15.059 .000 .000 15.059 A - - - - - - - 7 2021 NAVY 2.526 .000 2.526 2.526 7 2022 NAVY 25.514 .000 25.514 25.514 7 2023 NAVY 23.366 .000 23.366 23.366 8 2025 NAVY 1.738 .000 1.738 1.738 8 2026 NAVY .490 .000 .490 .490 8 2027 NAVY .800 .000 .800 .076 .236 9.600 .236 15.059 .800 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 .000 9.479 A - - - - - - - - - - - - .600 .875 1.000 1.500 1.500 1.500 1.000 .875 .629 9 2019 NAVY .055 .000 .055 A - - - - - - - - - - - - .005 .006 .006 .007 .007 .007 .006 .006 .005 9 2020 NAVY 25.100 .000 25.100 A - - - 9 2020 NAVY .219 .000 A - - - 9 2021 NAVY 19.032 .000 19.032 19.032 9 2021 NAVY 2.973 .000 2.973 2.973 9 2022 NAVY 3.555 .000 3.555 3.555 9 2023 NAVY 2.096 .000 2.096 2.096 10 2024 NAVY 20.286 .000 20.286 20.286 .219 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G .000 .000 25.100 .219 S E P Volume 3 - 13 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY 9 2025 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2019 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT NAVY 12.511 .000 12.511 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) Fiscal Year 2020 Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 12.511 (6) 11 2024 NAVY 1.445 .000 1.445 1.445 11 2025 NAVY 1.801 .000 1.801 1.801 11 2026 NAVY 1.469 .000 1.469 1.469 11 2027 NAVY 3.644 .000 3.644 3.644 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 14 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types B A L A N C E Fiscal Year 2022 Calendar Year 2021 J U N J U L Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y A U G S E P O C T N O V D E C J A N F E B .200 .200 .200 .200 .200 .250 .250 .204 .660 .660 .660 .660 .660 .660 .660 .660 .660 .653 M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 .600 1.704 1 2019 NAVY .677 .677 .000 1 2020 NAVY 7.253 .000 7.253 - - - - - .660 1 2020 NAVY .062 .000 .062 - - - - - .062 1 2021 NAVY 5.865 .000 5.865 A - - - - - - - - - - - - .530 .530 .530 .530 1 2021 NAVY .424 .000 .424 A - - - - - - - - - - - - .100 .100 .100 .124 1 2022 NAVY 6.289 .000 6.289 A - - - - 1 2023 NAVY 7.017 .000 7.017 7.017 2 2024 NAVY 2.394 .000 2.394 2.394 2 2025 NAVY 4.000 .000 4.000 4.000 2 2026 NAVY 1.434 .000 1.434 1.434 2 2027 NAVY 1.502 .000 1.502 1.502 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .000 .000 .000 .000 .530 .530 .530 .530 .530 .530 .565 - - - - - - 6.289 .000 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 19.353 50.035 8.900 9.000 8.900 8.300 8.000 6.935 3 2019 NAVY 18.244 4.750 13.494 3.250 3.250 3.250 2.000 1.500 .244 3 2020 NAVY 126.858 .000 126.858 - - - - - 3 2020 NAVY 1.302 .000 - - - - - .100 .150 .150 .175 .175 .175 .150 .150 .077 3 2021 NAVY 119.568 .000 119.568 A - - - - - - - - - - - - 3 2021 NAVY 3.816 .000 A - - - - - - - - - - - - 3 2022 NAVY 123.467 .000 123.467 3 2023 NAVY 146.015 .000 146.015 4 2024 NAVY 79.768 .000 79.768 79.768 4 2025 NAVY 120.118 .000 120.118 120.118 4 2026 NAVY 122.570 .000 122.570 122.570 4 2027 NAVY 125.214 .000 125.214 125.214 1.1.3) AN/SSQ-62 (DICASS) QZ004 1.302 3.816 .000 .000 12.500 13.000 14.500 15.000 15.000 15.302 14.500 14.000 12.556 .500 .000 .000 11.582 14.725 13.725 13.725 13.109 13.077 13.625 13.000 13.000 .350 .400 .500 .466 .450 .450 .400 .400 .400 A - - - - - - - - - .000 .000 - 123.467 146.015 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 7.685 15.366 2.561 2.561 2.561 2.561 2.561 2.561 5 2019 NAVY 1.449 .483 .161 .161 .161 .161 .161 .161 5 2020 NAVY 22.553 .000 22.553 - - - - - 2.300 2.500 2.500 2.600 2.600 2.600 2.500 2.596 2.357 M A R A P R M A Y J U N J U L A U G S E P O C T N O V .966 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B .000 .000 UNCLASSIFIED Page 15 of 30 .000 D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 15 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.966 2.000 2.000 1.500 1.500 1.500 1.500 2.000 1.429 2.000 2.510 .320 .300 .300 .300 .300 .276 .250 .250 .254 A - - - - - - - - - - 24.881 Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Fiscal Year 2022 Calendar Year 2021 Calendar Year 2022 O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 - - - .010 .010 .010 .012 .012 .012 .010 .010 .010 5 2021 NAVY 19.905 .000 19.905 A - - - - - - - - - - - - 5 2021 NAVY 2.550 .000 A - - - - - - - - - - - - 5 2022 NAVY 24.881 .000 24.881 5 2023 NAVY 24.493 .000 24.493 24.493 6 2024 NAVY 10.708 .000 10.708 10.708 6 2025 NAVY 18.828 .000 18.828 18.828 6 2026 NAVY 19.000 .000 19.000 19.000 6 2027 NAVY 10.000 .000 10.000 ✓ PROC QTY .000 O C T .096 N O V - D E C - 2.550 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V .000 .000 10.000 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 4.814 9.600 1.600 1.600 1.600 1.600 1.600 1.600 7 2019 NAVY .076 .027 .049 .009 .008 .008 .008 .008 .008 7 2020 NAVY 17.123 .000 17.123 - - - - - .550 1.400 2.000 3.000 3.000 3.000 2.000 1.400 .773 7 2020 NAVY .236 .000 - - - - - .025 .025 .025 .030 .030 .030 .025 .025 .021 7 2021 NAVY 15.059 .000 15.059 A - - - - - - - - - - - - 1.200 1.859 1.900 1.900 1.700 1.600 1.600 1.600 1.700 7 2021 NAVY 2.526 .000 A - - - - - - - - - - - - .250 .250 .300 .300 .300 .300 .300 .300 .226 7 2022 NAVY 25.514 .000 25.514 A - - - - - - - - - 7 2023 NAVY 23.366 .000 23.366 23.366 8 2025 NAVY 1.738 .000 1.738 1.738 8 2026 NAVY .490 .000 .490 .490 8 2027 NAVY .800 .000 .800 .236 2.526 .000 .000 .000 .000 .000 .000 - 25.514 .800 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 9.479 .000 9 2019 NAVY .055 .055 .000 9 2020 NAVY 25.100 9 2020 NAVY .219 9 2021 NAVY 19.032 9 2021 NAVY 9 2022 NAVY 9 2023 10 2024 .000 .000 .000 25.100 - - - - - - - - - 2.000 2.600 2.600 3.500 3.500 3.500 2.600 2.600 1.981 .000 - - - - - - - - - .010 .025 .030 .030 .030 .030 .030 .025 .009 .000 19.032 A - - - - - - - - - - - - .600 1.800 2.500 2.500 2.500 2.500 1.800 1.800 1.776 2.973 .000 2.973 A - - - - - - - - - - - - .223 .300 .350 .350 .350 .350 .350 .350 .350 3.555 .000 3.555 A - - - - - - - - - NAVY 2.096 .000 2.096 2.096 NAVY 20.286 .000 20.286 20.286 .219 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R .219 .000 .000 A P R M A Y J U N J U L A U G 1.256 .000 - 3.555 .000 S E P Volume 3 - 16 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY 9 2025 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2021 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT NAVY 12.511 .000 12.511 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) Fiscal Year 2022 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 12.511 (6) 11 2024 NAVY 1.445 .000 1.445 1.445 11 2025 NAVY 1.801 .000 1.801 1.801 11 2026 NAVY 1.469 .000 1.469 1.469 11 2027 NAVY 3.644 .000 3.644 3.644 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 17 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 2.304 .000 .000 1 2019 NAVY .677 .677 .000 .000 1 2020 NAVY 7.253 7.253 .000 .000 1 2020 NAVY .062 .062 .000 1 2021 NAVY 5.865 5.300 .565 1 2021 NAVY .424 .424 .000 1 2022 NAVY 6.289 .000 6.289 1 2023 NAVY 7.017 .000 7.017 2 2024 NAVY 2.394 .000 2.394 2.394 2 2025 NAVY 4.000 .000 4.000 4.000 2 2026 NAVY 1.434 .000 1.434 1.434 2 2027 NAVY 1.502 .000 1.502 1.502 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .000 .565 .000 .000 - - .570 .570 .570 .570 .570 .570 .570 .570 .570 .570 .589 A - - - - - - - - - - - .000 - .620 .637 .640 .640 .640 .640 .640 .640 .640 .640 .640 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 69.388 .000 .000 3 2019 NAVY 18.244 18.244 .000 .000 3 2020 NAVY 126.858 126.858 .000 .000 3 2020 NAVY 1.302 1.302 .000 .000 3 2021 NAVY 119.568 119.568 .000 .000 3 2021 NAVY 3.816 3.816 .000 3 2022 NAVY 123.467 .000 123.467 3 2023 NAVY 146.015 .000 146.015 4 2024 NAVY 79.768 .000 79.768 4 2025 NAVY 120.118 .000 120.118 120.118 4 2026 NAVY 122.570 .000 122.570 122.570 4 2027 NAVY 125.214 .000 125.214 125.214 1.1.3) AN/SSQ-62 (DICASS) QZ004 .000 - - 12.723 13.056 13.500 13.500 13.500 13.500 14.811 14.500 14.377 A - - - - - - - - .000 - - - - 14.500 14.550 14.550 14.550 14.550 14.550 14.550 14.600 14.564 15.051 A - - .000 79.768 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 23.051 .000 .000 5 2019 NAVY 1.449 1.449 .000 .000 5 2020 NAVY 22.553 22.553 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 18 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT B A L A N C E Fiscal Year 2024 Calendar Year 2023 Calendar Year 2024 O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 .096 .000 5 2021 NAVY 19.905 17.395 2.510 5 2021 NAVY 2.550 2.550 .000 5 2022 NAVY 24.881 .000 24.881 5 2023 NAVY 24.493 .000 24.493 6 2024 NAVY 10.708 .000 10.708 6 2025 NAVY 18.828 .000 18.828 18.828 6 2026 NAVY 19.000 .000 19.000 19.000 6 2027 NAVY 10.000 .000 10.000 ✓ PROC QTY 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 O C T N O V D E C 1.500 1.010 - - J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 .000 .000 3.000 3.000 3.000 2.500 3.000 3.000 3.000 2.000 2.381 A - - - - - - - - - .000 - - - 2.600 2.700 2.800 2.800 2.800 2.800 2.800 2.700 2.493 A - - - .000 - 10.708 10.000 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 14.414 .000 .000 7 2019 NAVY .076 .076 .000 .000 7 2020 NAVY 17.123 17.123 .000 .000 7 2020 NAVY .236 .236 .000 .000 7 2021 NAVY 15.059 15.059 .000 .000 7 2021 NAVY 2.526 2.526 .000 7 2022 NAVY 25.514 .000 25.514 7 2023 NAVY 23.366 .000 23.366 8 2025 NAVY 1.738 .000 1.738 1.738 8 2026 NAVY .490 .000 .490 .490 8 2027 NAVY .800 .000 .800 .000 - - 1.250 2.500 3.000 3.200 3.200 3.363 3.000 3.000 3.001 A - - - - - - - - - .000 - - - 2.100 2.600 2.600 2.600 2.600 2.641 2.359 2.866 1.500 1.500 .000 .800 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 9.479 .000 .000 9 2019 NAVY .055 .055 .000 .000 9 2020 NAVY 25.100 25.100 .000 .000 9 2020 NAVY .219 .219 .000 .000 9 2021 NAVY 19.032 19.032 .000 .000 9 2021 NAVY 2.973 2.973 .000 9 2022 NAVY 3.555 .000 3.555 9 2023 NAVY 2.096 .000 2.096 10 2024 NAVY 20.286 .000 20.286 .000 - O C T LI 4048 - Sonobuoys - All Types Navy - N O V .650 .650 .650 .650 .650 .305 A - - - - - - D E C J A N F E B M A R A P R M A Y .000 J U N J U L A U G UNCLASSIFIED Page 19 of 30 S E P O C T N O V .230 D E C .230 J A N .226 F E B P-1 Line #93 .210 .200 .200 .200 .200 .200 .200 .000 A - - - - - - - 20.286 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 19 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY 9 2025 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2023 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT NAVY 12.511 .000 12.511 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 12.511 (6) 11 2024 NAVY 1.445 .000 1.445 1.445 11 2025 NAVY 1.801 .000 1.801 1.801 11 2026 NAVY 1.469 .000 1.469 1.469 11 2027 NAVY 3.644 .000 3.644 3.644 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 20 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 2.304 .000 .000 1 2019 NAVY .677 .677 .000 .000 1 2020 NAVY 7.253 7.253 .000 .000 1 2020 NAVY .062 .062 .000 .000 1 2021 NAVY 5.865 5.865 .000 .000 1 2021 NAVY .424 .424 .000 .000 1 2022 NAVY 6.289 6.289 .000 1 2023 NAVY 7.017 6.377 .640 2 2024 NAVY 2.394 .000 2.394 A - - - - - - - - 2 2025 NAVY 4.000 .000 4.000 A - - - - - - - - 2 2026 NAVY 1.434 .000 1.434 2 2027 NAVY 1.502 .000 1.502 1.502 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .000 .640 .000 - - - - .050 .100 .125 .200 .200 .275 1.444 - - - - .108 .353 .353 .354 .354 .354 2.124 A - - - - - - - - - - 1.434 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 69.388 .000 .000 3 2019 NAVY 18.244 18.244 .000 .000 3 2020 NAVY 126.858 126.858 .000 .000 3 2020 NAVY 1.302 1.302 .000 .000 3 2021 NAVY 119.568 119.568 .000 .000 3 2021 NAVY 3.816 3.816 .000 .000 3 2022 NAVY 123.467 123.467 .000 .000 3 2023 NAVY 146.015 146.015 .000 4 2024 NAVY 79.768 .000 79.768 4 2025 NAVY 120.118 .000 120.118 4 2026 NAVY 122.570 .000 122.570 4 2027 NAVY 125.214 .000 125.214 1.1.3) AN/SSQ-62 (DICASS) QZ004 .000 - - - - - - - - - - 5.768 6.500 6.500 6.500 6.500 6.500 6.500 8.500 8.500 9.000 A - - - - - - - - - - - - A - - - 9.000 .000 3.200 10.628 10.628 10.628 85.034 - - - - 122.570 125.214 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 23.051 .000 .000 5 2019 NAVY 1.449 1.449 .000 .000 5 2020 NAVY 22.553 22.553 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 21 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT B A L A N C E Fiscal Year 2026 Calendar Year 2025 Calendar Year 2026 O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 .096 .000 .000 5 2021 NAVY 19.905 19.905 .000 .000 5 2021 NAVY 2.550 2.550 .000 .000 5 2022 NAVY 24.881 24.881 .000 .000 5 2023 NAVY 24.493 24.493 .000 6 2024 NAVY 10.708 .000 10.708 6 2025 NAVY 18.828 .000 18.828 6 2026 NAVY 19.000 .000 19.000 6 2027 NAVY 10.000 .000 10.000 ✓ PROC QTY 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 - - - - - - - - .896 .892 .892 .892 .892 .892 .892 .892 .892 .892 .892 .892 A - - - - - - - - - .000 - - - A - - - 1.172 17.656 - 19.000 10.000 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 14.414 .000 .000 7 2019 NAVY .076 .076 .000 .000 7 2020 NAVY 17.123 17.123 .000 .000 7 2020 NAVY .236 .236 .000 .000 7 2021 NAVY 15.059 15.059 .000 .000 7 2021 NAVY 2.526 2.526 .000 .000 7 2022 NAVY 25.514 25.514 .000 .000 7 2023 NAVY 23.366 23.366 .000 8 2025 NAVY 1.738 .000 1.738 8 2026 NAVY .490 .000 .490 8 2027 NAVY .800 .000 .800 .000 A - 1.738 .490 .800 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 9.479 .000 .000 9 2019 NAVY .055 .055 .000 .000 9 2020 NAVY 25.100 25.100 .000 .000 9 2020 NAVY .219 .219 .000 .000 9 2021 NAVY 19.032 19.032 .000 .000 9 2021 NAVY 2.973 2.973 .000 .000 9 2022 NAVY 3.555 3.555 .000 .000 9 2023 NAVY 2.096 2.096 .000 10 2024 NAVY 20.286 .000 20.286 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B 2.133 2.133 2.133 2.133 2.133 2.133 2.133 2.133 2.133 1.089 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C UNCLASSIFIED Page 22 of 30 .000 J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 22 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY 9 2025 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2025 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT NAVY 12.511 .000 12.511 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R A - M A Y - J U N - J U L - Calendar Year 2026 A U G - S E P - O C T - N O V - D E C - J A N F E B - - - 1.048 1.043 1.042 1.042 1.042 1.042 1.042 5.210 (6) 11 2024 NAVY 1.445 .000 1.445 A - - - - - - - - - - 1.445 11 2025 NAVY 1.801 .000 1.801 A - - - - - - - - - - 1.801 11 2026 NAVY 1.469 .000 1.469 A - - - - - - - - 1.469 11 2027 NAVY 3.644 .000 3.644 3.644 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 23 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 2.304 .000 .000 1 2019 NAVY .677 .677 .000 .000 1 2020 NAVY 7.253 7.253 .000 .000 1 2020 NAVY .062 .062 .000 .000 1 2021 NAVY 5.865 5.865 .000 .000 1 2021 NAVY .424 .424 .000 .000 1 2022 NAVY 6.289 6.289 .000 .000 1 2023 NAVY 7.017 7.017 .000 2 2024 NAVY 2.394 .950 1.444 .275 .275 .294 .300 .300 2 2025 NAVY 4.000 1.876 2.124 .354 .354 .354 .354 .354 .354 2 2026 NAVY 1.434 .000 1.434 - - .119 .119 .119 .119 .119 .119 .120 .120 .120 .120 .120 .120 2 2027 NAVY 1.502 .000 1.502 A - - - - - - - - - - - - 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .000 .000 .000 .000 .125 .125 .125 .125 .125 .125 .125 .125 .125 .125 .252 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 69.388 .000 .000 3 2019 NAVY 18.244 18.244 .000 .000 3 2020 NAVY 126.858 126.858 .000 .000 3 2020 NAVY 1.302 1.302 .000 .000 3 2021 NAVY 119.568 119.568 .000 .000 3 2021 NAVY 3.816 3.816 .000 .000 3 2022 NAVY 123.467 123.467 .000 .000 3 2023 NAVY 146.015 146.015 .000 .000 4 2024 NAVY 79.768 79.768 .000 .000 4 2025 NAVY 120.118 35.084 85.034 10.628 10.628 10.628 10.628 10.628 10.628 10.633 10.633 4 2026 NAVY 122.570 .000 122.570 4 2027 NAVY 125.214 .000 125.214 1.1.3) AN/SSQ-62 (DICASS) QZ004 - - - - - .000 10.214 10.214 10.214 10.214 10.214 10.214 10.214 10.214 10.214 10.214 10.215 10.215 A - - - - - - - - - - - - .000 10.434 10.434 10.434 10.434 10.434 10.434 10.434 52.176 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 23.051 .000 .000 5 2019 NAVY 1.449 1.449 .000 .000 5 2020 NAVY 22.553 22.553 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 24 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 B A L A N C E O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 .096 .000 .000 5 2021 NAVY 19.905 19.905 .000 .000 5 2021 NAVY 2.550 2.550 .000 .000 5 2022 NAVY 24.881 24.881 .000 .000 5 2023 NAVY 24.493 24.493 .000 .000 6 2024 NAVY 10.708 10.708 .000 6 2025 NAVY 18.828 1.172 17.656 1.605 1.605 1.605 1.605 1.605 1.605 1.605 1.605 1.605 1.605 1.606 6 2026 NAVY 19.000 .000 19.000 - - - - - - - - 1.583 1.583 1.583 1.583 1.583 1.583 1.583 1.583 1.584 1.584 1.584 1.584 6 2027 NAVY 10.000 .000 10.000 A - - - - - - - - - - - - ✓ PROC QTY 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 .000 .000 .833 .833 .833 .833 6.668 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 14.414 .000 .000 7 2019 NAVY .076 .076 .000 .000 7 2020 NAVY 17.123 17.123 .000 .000 7 2020 NAVY .236 .236 .000 .000 7 2021 NAVY 15.059 15.059 .000 .000 7 2021 NAVY 2.526 2.526 .000 .000 7 2022 NAVY 25.514 25.514 .000 .000 7 2023 NAVY 23.366 23.366 .000 8 2025 NAVY 1.738 .000 1.738 8 2026 NAVY .490 .000 .490 8 2027 NAVY .800 .000 .800 .000 - 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 - - - - - - - - - - .148 .144 .144 .144 .144 .144 .145 A - - - - - - - - - - - - .200 .100 .100 .090 A - - - - - - - - - - .145 .145 .145 .145 .145 - - .200 .100 .100 .000 .000 .100 .300 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 9.479 .000 .000 9 2019 NAVY .055 .055 .000 .000 9 2020 NAVY 25.100 25.100 .000 .000 9 2020 NAVY .219 .219 .000 .000 9 2021 NAVY 19.032 19.032 .000 .000 9 2021 NAVY 2.973 2.973 .000 .000 9 2022 NAVY 3.555 3.555 .000 .000 9 2023 NAVY 2.096 2.096 .000 .000 10 2024 NAVY 20.286 20.286 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 25 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 9 2025 NAVY 12.511 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 7.301 5.210 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R 1.042 1.042 1.042 1.042 1.042 A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 (6) 11 2024 NAVY 1.445 .000 1.445 - - .125 .120 .120 .120 .120 .120 .120 .120 .120 .120 .120 .120 11 2025 NAVY 1.801 .000 1.801 - - .151 .150 .150 .150 .150 .150 .150 .150 .150 .150 .150 .150 11 2026 NAVY 1.469 .000 1.469 - - - - .127 .122 .122 .122 .122 .122 .122 .122 .122 .122 .122 .122 11 2027 NAVY 3.644 .000 3.644 A - - - - - - - - - - - - .300 .304 .304 .304 .304 .304 .304 .304 .304 J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T LI 4048 - Sonobuoys - All Types Navy B A L A N C E N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 30 S E P O C T N O V .000 .000 D E C .000 P-1 Line #93 .912 Volume 3 - 26 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) AN/SSQ-36 (BT) QZ001 Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT PROC QTY Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 26368 ✓ ✓ ✓ 1 2019 NAVY 2.304 2.304 .000 .000 1 2019 NAVY .677 .677 .000 .000 1 2020 NAVY 7.253 7.253 .000 .000 1 2020 NAVY .062 .062 .000 .000 1 2021 NAVY 5.865 5.865 .000 .000 1 2021 NAVY .424 .424 .000 .000 1 2022 NAVY 6.289 6.289 .000 .000 1 2023 NAVY 7.017 7.017 .000 .000 2 2024 NAVY 2.394 2.394 .000 .000 2 2025 NAVY 4.000 4.000 .000 .000 2 2026 NAVY 1.434 1.434 .000 2 2027 NAVY 1.502 1.250 .252 1.1.2) AN/SSQ-53 (DIFAR) QZ002 .000 .126 .126 .000 (2) Prior Years Deliveries: 672936 ✓ ✓ ✓ 3 2019 NAVY 69.388 69.388 .000 .000 3 2019 NAVY 18.244 18.244 .000 .000 3 2020 NAVY 126.858 126.858 .000 .000 3 2020 NAVY 1.302 1.302 .000 .000 3 2021 NAVY 119.568 119.568 .000 .000 3 2021 NAVY 3.816 3.816 .000 .000 3 2022 NAVY 123.467 123.467 .000 .000 3 2023 NAVY 146.015 146.015 .000 .000 4 2024 NAVY 79.768 79.768 .000 .000 4 2025 NAVY 120.118 120.118 .000 .000 4 2026 NAVY 122.570 122.570 .000 .000 4 2027 NAVY 125.214 73.038 52.176 10.434 10.434 10.434 10.437 10.437 .000 1.1.3) AN/SSQ-62 (DICASS) QZ004 (3) Prior Years Deliveries: 84329 ✓ 5 2019 NAVY 23.051 23.051 .000 .000 5 2019 NAVY 1.449 1.449 .000 .000 5 2020 NAVY 22.553 22.553 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 27 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 27 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 Calendar Year 2030 B A L A N C E O O C M F R # FY SERVICE ✓ 5 2020 NAVY .096 .096 .000 .000 5 2021 NAVY 19.905 19.905 .000 .000 5 2021 NAVY 2.550 2.550 .000 .000 5 2022 NAVY 24.881 24.881 .000 .000 5 2023 NAVY 24.493 24.493 .000 .000 6 2024 NAVY 10.708 10.708 .000 .000 6 2025 NAVY 18.828 18.828 .000 .000 6 2026 NAVY 19.000 19.000 .000 6 2027 NAVY 10.000 3.332 6.668 ✓ PROC QTY 2.1.1) AN/SSQ-101 (Multi-static Coherent Receiver) QZ006 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 .833 .833 .833 .833 .834 .834 .834 .834 .000 (4) Prior Years Deliveries: 51329 ✓ ✓ ✓ 7 2019 NAVY 14.414 14.414 .000 .000 7 2019 NAVY .076 .076 .000 .000 7 2020 NAVY 17.123 17.123 .000 .000 7 2020 NAVY .236 .236 .000 .000 7 2021 NAVY 15.059 15.059 .000 .000 7 2021 NAVY 2.526 2.526 .000 .000 7 2022 NAVY 25.514 25.514 .000 .000 7 2023 NAVY 23.366 23.366 .000 .000 8 2025 NAVY 1.738 1.738 .000 .000 8 2026 NAVY .490 .490 .000 8 2027 NAVY .800 .500 .300 .000 .100 2.1.2) AN/SSQ-125/125A (Multi-static Coherent Source) QZ010 .100 .100 .000 (5) Prior Years Deliveries: 53790 ✓ ✓ ✓ 9 2019 NAVY 9.479 9.479 .000 .000 9 2019 NAVY .055 .055 .000 .000 9 2020 NAVY 25.100 25.100 .000 .000 9 2020 NAVY .219 .219 .000 .000 9 2021 NAVY 19.032 19.032 .000 .000 9 2021 NAVY 2.973 2.973 .000 .000 9 2022 NAVY 3.555 3.555 .000 .000 9 2023 NAVY 2.096 2.096 .000 .000 10 2024 NAVY 20.286 20.286 .000 .000 O C T LI 4048 - Sonobuoys - All Types Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 28 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 28 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY 9 2025 NAVY 12.511 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 12.511 2.1.3) AN/SSQ-125B (Multi-static Coherent Source) Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 B A L A N C E .000 (6) 11 2024 NAVY 1.445 1.445 .000 .000 11 2025 NAVY 1.801 1.801 .000 .000 11 2026 NAVY 1.469 1.469 .000 11 2027 NAVY 3.644 2.732 .912 LI 4048 - Sonobuoys - All Types Navy .000 .304 .304 .304 O C T N O V D E C .000 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #93 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 29 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4048 / Sonobuoys - All Types Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 1 Item Number / Title [DODIC]: 1 / Sonobuoys, All Types Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial ALT After Oct 1 Reorder MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 ERAPSCO - Columbia City IN 2,000 3,500 7,500 24 3 12 15 0 0 0 0 2 VARIOUS - VARIOUS 2,000 5,000 12,500 24 3 12 15 0 0 0 0 3 ERAPSCO - Columbia City IN 40,000 70,000 187,000 24 3 12 15 0 0 0 0 4 VARIOUS - VARIOUS 40,000 90,000 187,000 24 6 12 18 0 0 0 0 5 ERAPSCO - Columbia City IN 6,000 7,500 29,000 24 3 12 15 0 0 0 0 6 VARIOUS - VARIOUS 6,000 14,000 34,000 24 9 12 21 0 0 0 0 7 ERAPSCO - Columbia City IN 4,000 15,000 26,000 24 3 12 15 0 0 0 0 8 VARIOUS - VARIOUS 7,500 26,680 51,940 24 9 12 21 0 0 0 0 9 Various - Various 1,048 8,400 25,100 24 3 12 15 0 0 0 0 10 VARIOUS - VARIOUS 7,500 8,920 20,500 24 6 12 18 0 0 0 0 11 VARIOUS - TBD 2,000 4,000 10,000 0 4 12 16 0 0 0 0 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4048 - Sonobuoys - All Types Navy UNCLASSIFIED Page 30 of 30 P-1 Line #93 Volume 3 - 30 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3640 / Minotaur Program Elements for Code B Items: 0305241N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 25.679 5.431 5.191 4.831 0.000 4.831 5.127 5.211 5.335 - - - - - - - - - 25.679 5.431 5.191 4.831 0.000 4.831 5.127 5.211 5.335 - - - - - - - - - 25.679 5.431 5.191 4.831 0.000 4.831 5.127 5.211 5.335 To FY 2031 Complete 5.442 Continuing - Continuing - 5.442 Continuing - Total - Continuing - - 5.442 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Minotaur Family of Services (MFoS) provides overarching stewardship to the Minotaur Enterprise by providing Software ("Minotaur Core"), Data Distribution ("Labyrinth"), and Training. Minotaur is platform-agnostic Government software framework consisting of interfaces, data management, sensor exploitation, multi-source/platform correlation/fusion, and displays built to support Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) of sensor data. It creates a common tactical picture that provides data dissemination and interoperability methods within the Naval Operational Architecture (NOA) framework to support a Naval integrated kill chain for Distributed Maritime Operations (DMO). Minotaur is the foundation of the Minotaur Family of Services (MFoS) architecture which is the sole Program of Record (PoR) for the Tri-Service Enterprise (USN, USMC and USCG). MFoS capabilities are integrated across the maritime services (e.g., platforms and command centers) in support of the Tri-Service Maritime Strategy, Advantage at Sea. Minotaur operates at the Controlled Unclassified Information (CUI), Secret (S), and Top Secret (TS)/Sensitive Compartmented Information (SCI) security levels. Within MFoS, a Data Distribution architecture ("Labyrinth") aggregates tactical Minotaur data with national data to provide data-lake, data-warehousing, and data-dissemination using standard protocols via web-based services or Internet Protocol (IP) based networks to the tactical edge and disadvantaged users for twoway, one-way, and Emissions Control (EMCON) operations. This effort includes the procurement and delivery of data distribution capabilities to Fleet Commanders, as well as Technical Data Packages (TDPs) supporting ISR&T capabilities, to include TCPED of airborne, afloat and ashore systems across the Department of War (DoW) and Department of Homeland Security (DHS). LI 3640 - Minotaur Navy UNCLASSIFIED Page 1 of 3 P-1 Line #94 Volume 3 - 31 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3640 / Minotaur Program Elements for Code B Items: 0305241N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Minotaur - / 25.679 - / 5.431 - / 5.191 - / 4.831 - / 0.000 - / 4.831 P-40 Total Gross/Weapon System Cost - / 25.679 - / 5.431 - / 5.191 - / 4.831 - / 0.000 - / 4.831 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Minotaur Family of Services (MFoS) provides and supports data concepts needed to promote enterprise-level operational capabilities of Minotaur in a resilient Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, Reconnaissance, and Targeting (C5ISRT) architecture. FY27 Minotaur OPN funding provides analysis, Non-Recurring Engineering (NRE), integration, modernization, procurement, production, and delivery of MFoS capabilities; including, but not limited to production software releases, and obsolescence upgrades to pace the threat. LI 3640 - Minotaur Navy UNCLASSIFIED Page 2 of 3 P-1 Line #94 Volume 3 - 32 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3640 / Minotaur Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Minotaur MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 25.679 5.431 5.191 4.831 0.000 4.831 - - - - - - 25.679 5.431 5.191 4.831 0.000 4.831 - - - - - - 25.679 5.431 5.191 4.831 0.000 4.831 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Ship-Based - - 11.359 - - 1.777 - - 1.811 - - 1.740 - - - - - 1.740 1.1.2) Shore-Based - - 5.939 - - 1.884 - - 1.921 - - 1.766 - - - - - 1.766 Subtotal: Recurring Cost - - 17.298 - - 3.661 - - 3.732 - - 3.506 - - - - - 3.506 - - 17.298 - - 3.661 - - 3.732 - - 3.506 - - - - - 3.506 2.1) Data - - 1.042 - - 0.206 - - 0.175 - - 0.160 - - - - - 0.160 2.2) Training Equipment - - 2.610 - - 0.541 - - 0.461 - - 0.418 - - - - - 0.418 2.3) Support Equipment - - 2.737 - - 0.567 - - 0.445 - - 0.405 - - - - - 0.405 2.4) ILS - - 0.805 - - 0.138 - - 0.118 - - 0.107 - - - - - 0.107 2.5) Other Support - - 1.187 - - 0.318 - - 0.260 - - 0.235 - - - - - 0.235 Subtotal: Support Cost - - 8.381 - - 1.770 - - 1.459 - - 1.325 - - - - - 1.325 Gross/Weapon System Cost - - 25.679 - - 5.431 - - 5.191 - - 4.831 - - 0.000 - - 4.831 Subtotal: Hardware Cost Support Cost LI 3640 - Minotaur Navy UNCLASSIFIED Page 3 of 3 P-1 Line #94 Volume 3 - 33 === page 110 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 34 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,325.756 1,325.756 1,325.756 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 138.062 138.062 138.062 123.435 123.435 123.435 119.900 119.900 119.900 0.000 0.000 0.000 119.900 119.900 119.900 121.715 121.715 121.715 127.393 127.393 127.393 126.798 126.798 - To FY 2031 Complete 129.370 Continuing 129.370 Total - Continuing Continuing - Continuing - - 126.798 129.370 Continuing Continuing 23.269 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 8.693 2.062 8.281 - 8.281 12.570 12.470 24.265 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item provides the resources to implement the Navy Fleet Training Range (FTR) Instrumentation Program Plan. These FTRs provide the primary means of fleet combat readiness training. The plan addresses the following major procurement areas: Electronic Warfare (EW) systems, simulators, Systems Replacement and Modernization (SRAM), and generic systems such as range computer systems, simulation, surveillance systems, and Aerial Targets Range Support equipment including Moving Land Targets (MLT) and Target Threat Simulation Program (TTSP) equipment; MLT includes vehicles, vehicle components, and Engineering Change Proposals to upgrade hardware; TTSP equipment includes EW & Threat Payload simulations, electronic countermeasures equipment and active emitter augmentation equipment. Tactical Combat Training System (TCTS), Undersea Warfare Training Ranges (USWTR), and range infrastructure necessary to enable Live Virtual Constructive (LVC) training capability provides constructive training information from ground-based stations to live aircraft. The integral parts of these major range programs include but are not limited to the following: voice communications, weapons scoring systems (Laser Training and Weapons Impact Scoring Sets), display consoles, radars, tracking subsystems, control/ computation subsystems, display/ debriefing subsystems, processors, HF/ VHF/ UHF receivers, transmitters/ transceivers, multiplexers, intercom circuits, encoding devices, frequency interface control systems, peculiar support equipment, and other specialized equipment. [P5 / SC004 SRAM - Systems Replacement and Modernization]: The SRAM program provides for the procurement of numerous non-recurring range equipment replacement and modernization efforts that are needed at all Naval training ranges. SRAM procurements replace and modernize economically unmaintainable systems and equipment in order to increase range efficiency. Funding for installation of minor equipment is required in all years for all ranges. Sample procurements include electronic warfare systems, weapons scoring systems, laser training systems, secure communications equipment, ocean systems acoustical equipment, microwave data links, telecom fiber upgrades, video equipment replacement for security risk reduction, and electrical generators. [P5 / SC012 OS - Ocean Systems]: Funds the multi-year procurement and upgrade of fixed underwater training ranges at Pacific Missile Range Facility (PMRF), Barking Sands, HI and Southern California OffShore Anti-Submarine Warfare (ASW) Range (SOAR), CA. Instrumented undersea ranges provide time, space position information for undersea warfare platforms, weapons and targets in support of Fleet Training and Test and Evaluation. Upgrades include cyber security enhancements, increased range accuracy, and splash detection capabilities. The underwater ranges are used to provide individual and unit level training for basic ASW skills. Large exercises such as Composite Training Unit Exercises (COMTUEX), Fleet Exercises (FLEETEX), and Joint Task Force Exercises (JTFX) are conducted in the vicinity of the fixed underwater training ranges. Items procured under this cost element include hydrophones, undersea cable, and shore system electronics. Funded programs include Barking Sands Tactical Underwater Range (BARSTUR)/Barking Sands Underwater Range Expansion (BSURE) refurbishment and West Coast Undersea Warfare Training Ranges (WC USWTR) which include SOAR, Tanner Bank (TB) and San Clemente Island (SCI). LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 1 of 9 P-1 Line #95 Volume 3 - 35 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / SC158 TCTS Common Ground Subsystem]: The Tactical Combat Training System Inc II (TCTS II) will procure fixed and transportable instrumentation equipment for both shore-based and deployable (e.g. temporary range, ship) range applications. TCTS II instrumentation will transmit exercise scenarios, simulate/stimulate exercise participants sensors/weapons with the exercise scenario, track all exercise participants and events like weapons engagements, and provide accurate, realistic, and timely feedback. TCTS II is building on technology developed for existing tactical training range systems. TCTS II consists of airborne instrumentation called Participant Subsystems (PS) and the Common Ground Subsystem (CGS). Annual quantities procured are estimated until the follow-on Production contract awards in September 2026. Department of the Navy investment to deliver TCTS II quantities as determined by Version 14 of the Fleet Instrumentation Plan. One (1) CGS will be procured in FY2027 to support fielding at Pacific Missile Range Facility, Barking Sands (PMRF). [P5 / SC140 TCTS Remote Range Unit]: SC140 The Tactical Combat Training System Inc II (TCTS II) Remote Range Unit (RRU) provides encrypted range communication capability across large Tactical Training Range areas, which are somewhat analogous to cellular telephone towers. Unit costs for RRU include site-specific costs for each Training Range and will vary per year. Annual quantities procured are estimated until the follow-on Production contract awards in September 2026. Department of the Navy investment to accelerate production and delivery of TCTS II quantities as determined by Version 14 of the Fleet Instrumentation Plan. Four (4) RRUs will be procured in FY2027 to support fielding at Pacific Missile Range Facility, Barking Sands (PMRF) and the start of procurement of East and West Coast deployable kits. [P5 / TCTS ENGINEERING CHANGE PROPOSAL]: The Tactical Combat Training System Inc II (TCTS II) Engineering Change Proposal (ECP) funds procurement of critical capability updates, both software and hardware updates to the TCTS II system to ensure cybersecurity compliance and connectivity with existing range infrastructure in support of connected Live-Virtual-Constructive (LVC) training requirements. [P5 / SC040 TCTS Shipboard Ground Subsystem]: The Shipboard Ground Subsystem (SGS) provides Tactical Combat Training System Inc II (TCTS II) connectivity and real-time exercise control on CVN when out of range of fixed range infrastructure. The SGS must be integrated with other shipboard systems. [P5 / SC105 EW - Threat Presentation]: Threat Presentation includes all the necessary components and elements associated with presenting friendly training event participants with an opposing force (OPFOR) operating environment that replicates the expected enemy order of battle. The capability of a range to recreate any Electronic Combat electronic order of battle requires a range to simulate or emulate basic elements of Electronic Combat such as search, acquisition and tracking radars, anti-aircraft artillery (AAA) systems, surface-to-air missile (SAM) systems, infrared (IR) systems, jammers, coastal threats, airborne simulators, and information warfare / command and control systems. Individual COTS/GOTS EW systems that are procured vary from year to year. [P5 / SC151 MLT Hardware]: The Moving Land Target (MLT) Program will provide Moving Land Target vehicles to train aircrews in the demands of Close Air Support (CAS), Time Sensitive Targeting (TST), Target Identification, and Forward Air Controller (FAC) procedures within a Network Centric Warfighting force. MLT provides aircrews with threat representative targets that provide infrared reactivity, mobility, and realistic radar cross-section targets to meet their combat training and testing needs. The MLT program procures Moving Land Target vehicles, vehicle components, and Engineering Change Proposals to upgrade hardware. [P5 / SC152 MLT Engineering Change Proposals]: Costs include the procurement of Engineering Change Proposals for critical hardware/software/firmware updates to the Moving Land Targets (MLT). [P5 / SC106 TTSP]: The Target Threat Simulation Program (TTSP) replicates various threats dependent upon the objectives of the test and evaluation event(s). TTSP procures the payload equipment required to electronically enhance aerial/surface targets to provide threat representative Radio Frequency signatures, specifically the Electronic Attack and Threat Radar Emissions (Active Emitters). TTSP accomplishes this through a collection of modules which are integrated into the target in various configurations, providing the ability to simulate the RF environment. [P5 / SC711 LVC Range Integration]: Funds Range Live Virtual Constructive (LVC) integration allowing real-time telemetry to be received from new aircraft reaching the fleet. Establish persistent integrated training between AEGIS, CVW, Maritime & UAS training assets by enabling LVC capability with live aircraft on Tactical Training Range (TTR) sites. Effort will modify range infrastructure at multiple range sites to provide secure network connectivity to provide robust integrated training capability. Allows range communications, networking, and mission brief, display, and debrief capabilities at multiple levels of security. LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 2 of 9 P-1 Line #95 Volume 3 - 36 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Weapons Range Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,325.756 - / 138.062 - / 123.435 - / 119.900 - / 0.000 - / 119.900 - / 1,325.756 - / 138.062 - / 123.435 - / 119.900 - / 0.000 - / 119.900 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The Systems Replacement and Modernization (SRAM) funds fleet priorities for modernization efforts at Naval training ranges in support of fleet training wholeness (FTW). Projects are non-recurring efforts that vary from year to year and are prioritized on an annual basis to meet fleet training readiness requirements. SRAM ensures current fleet training capabilities are not degraded for the lack of minor equipment. The ACAT IV Undersea Warfare Training Ranges (USWTR) Program of Record (PoR) contract was awarded 8 July 21 for $410M and continues the effort to modernize and deliver six (6) Training Ranges. The In-Water Sensor (IWS) system and shore electronics for Anti-Submarine Warfare (ASW) training ranges at Pacific Missile Range Facility (PMRF), Barking Sands, HI, (e.g. Barking Sands Tactical Underwater Range (BARSTUR)/Barking Sands Underwater Range Expansion (BSURE) and Southern California ASW Range (SOAR), CA). The effort will be a time-phased procurement exception to the full funding policy. Hardware buys will vary in cost from year to year to meet the Fleet's required date for Initial Operational Capability (IOC) which is slated for BARSTUR/BSURE (4QFY2027) and Tanner Bank (TB) (4QFY2030). Full Operational Capability (FOC) is slated for San Clemente Island (SCI) (4QFY2031) and SOAR (4QFY2032). FY2027 procurements include funds for SCI IWS procurement, production, and test, SOAR trunk and internode cable procurement, and Display, Processing and Control System (DPCS) TB/SCI procurement, production, test and integration with IWS efforts and DPCS BARSTUR/BSURE final analysis and closeout actions to declare IOC. Additionally, this effort funds various Systems Engineering Technical Reviews required to execute the Undersea Warfare Training Range Increment II and III programs. Funds in FY2027 will continue Full-Rate Production of Tactical Combat Training System Increment II (TCTS II) and continues efforts to field additional participant systems, ground subsystems and remote range units. FY2027 funds the procurement of one (1) Common Ground Subsystem (CGS), four (4) Remote Range Units (RRU) to provide encryption capability for Fleet training exercises. SC105 EW Electronic Warfare (EW) Threat Presentation funding fluctuates from year to year reflecting Navy prioritization of various EW Threat Presentation devices for use at multiple Tactical Training Range (TTR) sites, including Fallon, NV; Yuma, AZ; Southern California Tactical Training Range (SCTTR), CA; Townsend, SC; Mid-Atlantic Electronic Warfare Range (MAEWR), NC. FY2027 Fleet Training Wholeness Initiative procures additional ALQ-167 Electronic Attack pods, EW 5th GEN Modular Remote Threat Emitter (MRTE) Tier 1 & Tier 2 Systems, and completes specific number of electronic warfare system technology refreshes based on available budget to sustain and improve availability and maintainability of secure authority to operate (ATO) cyber certifications for initial ATO's at Fleet range sites that include EW Opposition Force (OPFOR) training capabilities and connect those systems to the Navy Enterprise Tactical Training Network (NETTN). Funds in FY2027 for Live-Virtual-Constructive (LVC) will provide equipment for additional distributed mission training capability to East Coast and West Coast Tactical Training Ranges (TTR), with voice communication and datalink equipment in support of Live Virtual Constructive (LVC) capabilities. Install distributed network capabilities at various West Coast TTR's, according to Fleet priorities, in support of LVC capabilities. LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 3 of 9 P-1 Line #95 Volume 3 - 37 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 1,325.756 Less PY Advance Procurement ($ in Millions) 138.062 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 119.900 - 0.000 - 123.435 119.900 - 119.900 - 138.062 FY 2027 Total 0.000 - 123.435 - 1,325.756 - - 138.062 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 123.435 - 1,325.756 FY 2027 Base - 119.900 - - 119.900 0.000 119.900 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 8.693 2.062 8.281 - 8.281 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Systems Replacement and Modernization Cost Recurring Cost 1.1.1) SC004 SRAM Systems Replacement - - 228.975 - - 7.648 - - 7.808 - - 4.059 - - - - - 4.059 Subtotal: Recurring Cost - - 228.975 - - 7.648 - - 7.808 - - 4.059 - - - - - 4.059 Subtotal: Hardware Systems Replacement and Modernization Cost - - 228.975 - - 7.648 - - 7.808 - - 4.059 - - - - - 4.059 - - 202.743 - - 55.694 - - 62.535 - - 58.511 - - - - - 58.511 2.1.2) SC161 OS East Coast USWTR - - 178.721 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 381.464 - - 55.694 - - 62.535 - - 58.511 - - - - - 58.511 Subtotal: Hardware - Ocean Systems Cost - - 381.464 - - 55.694 - - 62.535 - - 58.511 - - - - - 58.511 - 3.308 - - - - - - - - - - - - - - - and Modernization (1) Hardware - Ocean Systems Cost Recurring Cost 2.1.1) SC012 OS Ocean Systems (2) Hardware - Large Area Tracking Range Cost Recurring Cost 3.1.1) SC034 LATR Shipboard Rotary Technology Upgrade - LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 4 of 9 P-1 Line #95 Volume 3 - 38 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 3.1.2) SC132 LATR Navigation Technology Refresh - - 4.846 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 8.154 - - - - - - - - - - - - - - - Subtotal: Hardware - Large Area Tracking Range Cost - - 8.154 - - - - - - - - - - - - - - - Hardware - Tactical Combat Training System Cost Recurring Cost 4.1.1) SC158 TCTS Common Ground Subsystem (†) (3) 4.1.2) SC140 TCTS Remote Range Unit (†) (4) 741,375.00 8 5.931 932,666.67 3 2.798 951,200.00 2 1.902 1,260K 1 1.260 - - - 1,260K 1 1.260 579,578.95 19 11.012 367,444.44 9 3.307 404,468.94 12 4.854 481,648.75 4 1.927 - - - 481,648.75 4 1.927 - 0.629 - - 1.267 - - - - - 1.267 0.468 - - - - - - - - - 4.1.4) TCTS ENGINEERING CHANGE PROPOSAL - - 0.945 4.1.5) SC040 TCTS Shipboard Ground - - - - - 17.888 - - 14.972 - - 7.853 - - 4.454 - - - - - 4.454 - - 8.053 - (5) Subsystem (†) Subtotal: Recurring Cost 406,760.00 2 0.814 467,570.00 1 Non Recurring Cost 4.2.1) Non-Recurring - - - - - 5.566 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 5.566 - - - - - - - - - - - - Subtotal: Hardware - Tactical Combat Training System Cost - - 17.888 - - 20.538 - - 7.853 - - 4.454 - - - - - 4.454 Hardware - Electronic Warfare Training Equipment Cost Recurring Cost 5.1.1) SC105 EW - (6) - - 301.192 - - 25.482 - - 28.701 - - 28.448 - - - - - 28.448 Subtotal: Recurring Cost - - 301.192 - - 25.482 - - 28.701 - - 28.448 - - - - - 28.448 Subtotal: Hardware Electronic Warfare Training Equipment Cost - - 301.192 - - 25.482 - - 28.701 - - 28.448 - - - - - 28.448 Threat Presentation Hardware - Aerial Targets Range Support Equipment Cost Recurring Cost LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 5 of 9 P-1 Line #95 Volume 3 - 39 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 6.1.1) SC151 MLT FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (7) - - 25.620 - - 1.685 - - 1.722 - - 1.590 - - - - - 1.590 6.1.2) SC152 MLT Engineering Change - - 0.970 - - 0.035 - - 0.035 - - 0.036 - - - - - 0.036 Hardware Proposals (8) (9) - - 0.995 - - 0.112 - - 0.114 - - 0.116 - - - - - 0.116 Subtotal: Recurring Cost - - 27.585 - - 1.832 - - 1.871 - - 1.742 - - - - - 1.742 Subtotal: Hardware - Aerial Targets Range Support Equipment Cost - - 27.585 - - 1.832 - - 1.871 - - 1.742 - - - - - 1.742 6.1.3) SC106 TTSP Hardware - Live-Virtual-Constructive Cost Recurring Cost 7.1.1) SC711 LVC (10) - - 55.530 - - 9.739 - - 1.910 - - 8.199 - - - - - 8.199 Subtotal: Recurring Cost - - 55.530 - - 9.739 - - 1.910 - - 8.199 - - - - - 8.199 Subtotal: Hardware - LiveVirtual-Constructive Cost - - 55.530 - - 9.739 - - 1.910 - - 8.199 - - - - - 8.199 Range Integration Software - SC158 TCTS Block Upgrade Cost Recurring Cost 8.1.1) SC158 - TCTS Block Upgrade - - 9.331 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 9.331 - - - - - - - - - - - - - - - Subtotal: Software - SC158 TCTS Block Upgrade Cost - - 9.331 - - - - - - - - - - - - - - - 9.1) SC820 SRAM - - 2.832 - - 0.647 - - 0.661 - - 0.398 - - - - - 0.398 9.2) SC820 Ocean Systems - - 20.701 - - 1.657 - - 1.804 - - 1.653 - - - - - 1.653 9.3) SC820 LATR - - 0.539 - - - - - - - - - - - - - - - 9.4) SC820 TCTS - - 4.858 - - 2.158 - - 0.389 - - 0.397 - - - - - 0.397 - - 17.342 - - 1.977 - - 2.019 - - 2.472 - - - - - 2.472 - - 1.276 - - 0.477 - - 0.110 - - 0.487 - - - - - 0.487 - - 47.548 - - 6.916 - - 4.983 - - 5.407 - - - - - 5.407 - - 28.222 - - 1.891 - - 1.931 - - 1.415 - - - - - 1.415 Support - Production Support Cost 9.5) SC820 EW (11) 9.6) SC820 LVC Range Integration (12) Subtotal: Support Production Support Cost Support - Production Engineering Cost 10.1) SC831 SRAM LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 6 of 9 P-1 Line #95 Volume 3 - 40 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 10.2) SC831 Ocean Systems - - 73.601 - - 2.820 - - 3.039 - - 2.848 - - - - - 10.3) SC831 LATR - - 1.106 - - - - - - - - - - - - - - - - - 25.932 - - 3.027 - - 0.389 - - 2.011 - - - - - 2.011 10.4) SC831 TCTS (13) (14) 2.848 - - 40.367 - - 1.775 - - 1.812 - - 2.219 - - - - - 2.219 10.6) SC832 MLT - - 4.458 - - 0.450 - - 0.368 - - 0.347 - - - - - 0.347 10.7) SC831 LVC Range Integration - - 2.891 - - 0.250 - - 0.235 - - 0.240 - - - - - 0.240 10.5) SC831 EW 10.8) SC831 Prior Years - - 71.512 - - - - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 248.089 - - 10.213 - - 7.774 - - 9.080 - - - - - 9.080 Gross/Weapon System Cost - - 1,325.756 - - 138.062 - - 123.435 - - 119.900 - - 0.000 - - 119.900 (†) indicates the presence of a P-5a Footnotes: (1) (2) SC004 SRAM: Decrease of $3.749M from FY2026 to FY2027 in order to fund Fallon Range Training Complex 5th Generation EW Modernization. SC012 Ocean Systems: Decrease of $4.024M from FY2026 to FY2027 in order to fund Fallon Range Training Complex 5th Generation EW Modernization. FY2027 reduction also includes realignment to fund wholeness of Ocean Systems Support Activity sustainment. (3) SC158 TCTS Common Ground Subsystem: Unit cost increase of $309k from FY2026 to FY2027 due to current market conditions and low quantity of hardware being procured. FY2027 procurement reflects the final planned acquisition under the current fielding plan pending the follow-on production contract award in September 2026. (4) SC140 TCTS Remote Range Unit: Unit cost increase of $77K from FY2026 to FY2027 for RRUs due to current market conditions including site-specific costs associated with range integration and will vary from range-to-range due to site specific requirements and year-to-year based on site fielding plans. FY2027 procurement reflects the final planned acquisition under the current fielding plan pending the follow-on production contract award in September 2026. (5) (6) TCTS ENGINEERING CHANGE PROPOSAL: Increase of $0.638M from FY2026 to FY2027 is due to increased obsolescence and tech refresh costs. SC105 EW-Threat Presentation: FY2027 invests in procurement of Modern 5th Generation EW Emulators (7 MRTE, 4 ARTS(V)-3 Mini VADR, 1 ARTS (V)3 Lite DD SAM; and 8 static target shapes) to modernize the Fallon Range Training Complex. This investment upgrades Fallon Range Training Complex from 3rd Generation to 5th Generation Electronic Warfare threat emulators to provide an operationally realistic electromagnetic environment for aviation pre-deployment training. (7) SC151 MLT Hardware: MLT Hardware includes Moving Land Target Vehicles, Ground Control Stations, Command and Control units, Data Links, Radio kits, Range equipment, Relays and other hardware such as kits to include weapon instrumentation kits, specialty tires / wheels, and equipment protection. Equipment being procured is based on the operational demand / training requirements of the fleet, which vary from year to year; consequently, the items, quantities of items, and associated unit costs of the items being procured, vary from year to year. Hardware procured is not one for one with target vehicles. Decrease of funds from FY2026 to FY2027 is due to completion of universal interface effort. (8) SC152 MLT ECP: Costs include the procurement of Engineering Change Proposals for critical hardware/software/firmware updates (i.e.: Information Assurance / Windows / System Change Requests (SCRs)), as well as engineering system level changes to meet the requirements of the Risk Management Framework (RMF) Information Assurance (IA) processes and all safety/modernization related issues. LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 7 of 9 P-1 Line #95 Volume 3 - 41 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment MDAP/MAIS Code: (9) SC 106 - TTSP: Hardware quantities and unit costs are dependent upon which threat simulation equipment is being procured; some equipment is more expensive than others and the type of equipment being procured is dependent upon Fleet requirements and consumption. It is critical to maintain adequate inventory levels as these assets are required to establish readiness capability for the Fleet. Increase of funds from FY2026 to FY2027 is due to obsolescence-related parts in FY2027. (10) SC711 LVC Range Integration: Increase of $6.289M from FY2026 to FY2027 due to Chief of Naval Air Training (CNATRA) simulator wholeness after one-year delay in FY2026. FY2027 funds provide equipment for initial distributed capability and additional capability at East Coast and West Coast Tactical Training Range (TTR), with voice communication and datalink equipment in support of Live Virtual Constructive (LVC) capabilities. Install distributed network capabilities at various West Coast TTR's, according to Fleet priorities, in support of LVC capabilities. (11) SC820 EW: Increase of $0.453M from FY2026 to FY2027 due to investment in procurement of Modern 5th Generation EW Emulators (7 MRTE, 4 ARTS(V)-3 Mini VADR, 1 ARTS (V)3 Lite DD SAM; and 8 static target shapes) to modernize the Fallon Range Training Complex. This investment upgrades Fallon Range Training Complex from 3rd Generation to 5th Generation Electronic Warfare threat emulators to provide an operationally realistic electromagnetic environment for aviation pre-deployment training. (12) (13) (14) SC820 LVC Range Integration: Increase of $0.377M from FY2026 to FY2027 due to CNATRA simulator wholeness. SC831 TCTS: Increase of $1.622M from FY2026 to FY2027 due to costs associated with Site Based Security Assessment (SBSA) required as part of site stand-up & cross-domain solution authorization. SC831 EW: Increase of $0.407M from FY2026 to FY2027 due to investment in procurement of Modern 5th Generation EW Emulators (7 MRTE, 4 ARTS(V)-3 Mini VADR, 1 ARTS (V)3 Lite DD SAM; and 8 static target shapes) to modernize the Fallon Range Training Complex. This investment upgrades Fallon Range Training Complex from 3rd Generation to 5th Generation Electronic Warfare threat emulators to provide an operationally realistic electromagnetic environment for aviation pre-deployment training. LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 8 of 9 P-1 Line #95 Volume 3 - 42 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC]: 1 / Weapons Range Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 4.1.1) SC158 TCTS Common Ground Subsystem 2023 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2023 Jul 2024 2 842,138.00 Y Apr 2022 4.1.1) SC158 TCTS Common Ground Subsystem 2024 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2024 Jul 2025 4 352,117.14 Y Mar 2023 4.1.1) SC158 TCTS Common Ground Subsystem 2025 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2025 Jul 2026 3 932,666.67 Y Mar 2024 Cost Elements O O C P-1 Line Item Number / Title: 4204 / Weapons Range Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4.1.1) SC158 TCTS Common Ground Subsystem 2026 (15) TBD (16) / TBD C / IDIQ NAWCTSD Sep 2026 Sep 2026 2 951,200.00 Y Apr 2026 4.1.1) SC158 TCTS Common Ground Subsystem 2027 (17) TBD (16) / TBD C / IDIQ NAWCTSD Sep 2027 Sep 2027 1 1,260K Y Apr 2027 4.1.2) SC140 TCTS Remote Range Unit 2022 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Mar 2022 Sep 2023 4 318,500.00 Y Feb 2021 4.1.2) SC140 TCTS Remote Range Unit 2023 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2023 Jul 2024 3 519,664.00 Y Apr 2022 4.1.2) SC140 TCTS Remote Range Unit 2024 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2024 Jul 2025 5 342,794.56 Y Mar 2023 4.1.2) SC140 TCTS Remote Range Unit 2025 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2025 Jul 2026 9 367,444.44 Y Mar 2024 4.1.2) SC140 TCTS Remote Range Unit 2026 (18) TBD (19) / TBD C / IDIQ NAWCTSD Sep 2026 Sep 2026 12 404,468.94 Y Apr 2026 4.1.2) SC140 TCTS Remote Range Unit 2027 (20) TBD (19) / TBD C / IDIQ NAWCTSD Sep 2027 Sep 2027 4 481,648.75 Y Apr 2027 4.1.5) SC040 TCTS Shipboard Ground Subsystem 2025 (21) Collins Aerospace / Cedar Rapids, IA TBD TBD Sep 2026 Mar 2028 2 406,760.00 Y 4.1.5) SC040 TCTS Shipboard Ground Subsystem 2026 (22) Collins Aerospace / Cedar Rapids, IA C / TBD TBD Sep 2026 Mar 2028 1 467,570.00 Y Footnotes: (15) (16) (17) (18) (19) (20) (21) (22) Starting in September 2026, awardee unknown for production follow-on contract. Starting in September 2026, awardee unknown for production follow-on contract. Starting in September 2026, awardee unknown for production follow-on contract. Starting in September 2026, awardee unknown for production follow-on contract. Starting in September 2026, awardee unknown for production follow-on contract. Starting in September 2026, awardee unknown for production follow-on contract. To be awarded as part of follow-on production contract in SEP 2026. To be awarded as part of follow-on production contract in SEP 2026. LI 4204 - Weapons Range Support Equipment Navy UNCLASSIFIED Page 9 of 9 P-1 Line #95 Volume 3 - 43 === page 120 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 44 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604112N, 0604530N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,588.998 1,588.998 1,588.998 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 82.039 69.065 0.000 69.065 86.878 87.230 98.236 121.727 121.727 121.727 - - - - - - - 82.039 69.065 0.000 69.065 86.878 87.230 98.236 - - - - - - - 82.039 69.065 0.000 69.065 86.878 87.230 98.236 To FY 2031 Complete 101.270 Continuing 101.270 Total - Continuing Continuing - Continuing - - Continuing Continuing 0.126 Continuing Continuing 101.270 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.026 1.728 8.097 - 8.097 16.925 7.671 0.146 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AVIATION SUPPORT EQUIPMENT provides funds for the procurement of air-launched anti-submarine (ASW) detection and other general support equipment associated with aircraft systems. Other support equipment includes ground electronics equipment, aircraft launch and recovery equipment, photographic equipment, reconnaissance and electronic warfare process. The items contained within this budget line item were previously funded under the following line items in FY14 and prior: 4208 Expeditionary Airfields 4214 Aircraft Rearming Equipment 4216 Aircraft Launch and Recovery Equipment 4255 LAMPS MK III Shipboard Equipment [P5 / Expeditionary Airfields]: This program provides Expeditionary Airfield Surfacing Equipment for procurement of aircraft recovery equipment, Expeditionary Airfield Surfacing Equipment and accessories, Airfield Lighting Equipment and Visual Landing Aids for Naval Aviation Expeditionary Airfields (EAF.) EAF recovery equipment consists of the Marine Corps Expeditionary Arresting Gear and its accessories. This equipment is used to stop aircraft in less than 1000 ft. on EAF surfacing equipment and accessories are used to construct airfields of varying configurations such as, 6000+ ft conventional airport runways and taxiways, Forward Arming and Refueling Points (FARPs), Forward Operating Bases (FOBs), Landing Zones (LZs), Vertical Takeoff and Landing (VTOL) areas, Vertical Short Takeoff and Landing (VSTOL) runways, and parking areas. EAF Lighting equipment augments the many types of EAFs with lighting of the runways, taxiways, parking ramps, LZs, FARPs, FOBs, VTOL pads and VSTOL's, In addition, EAF Lighting identifies airspace obstructions and provides wind direction guidance along with pilot controlled capability. Much of the EAF Lighting utilizes Infrared Lighting for use with Night Vision Devices for night operations by all Type/Model/Series aircraft. Precision Approach Path Indicator (PAPI) and Omni Directional Approach Lighting Systems (ODALS) are used to guide aircraft to the proper landing or arresting gear area of the EAF. This core funding level directly supports the procurement and fielding of operational EAF systems for three Active Marine Aircraft Wings (MAW) and one Reserve MAW, testing and training installations, and provides assets for use by the Marine Expeditionary Forces during contingency operations. These systems directly support the Marine Corps ability to be trained and equipped as a naval expeditionary force-in-readiness prepared to operate in a contested environment. FY2024 also includes additional funding for replacement of surfacing and lighting equipment lost in support of Over The Horizon (OTH) efforts for US Central Command requirement for Expeditionary Airfield Systems aboard Prince Sultan Air Base, Kingdom of Saudi Arabia, in support of rotor, tilt rotor, and fixed wing aircraft operations. This surfacing and lighting equipment are an EAF War Reserve asset and directly affects the deployment of future crisis support options. Resupply of contingency surfacing and lighting equipment to support the Fleet Marine Forces' deployment goals enables commanders the unique capabilities to provide Forward Arming and Refueling Points (FARPs) and Forward Operating Bases (FOBS) in support of unmanned, rotary and fixed wing aircraft, enabling performance of a variety of functions to include: medivac, assault support, air reconnaissance, anti-air warfare, offensive air support, and electronic warfare. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 1 of 32 P-1 Line #96 Volume 3 - 45 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604112N, 0604530N Line Item MDAP/MAIS Code: N/A [P5 - 2 / Acft Rearming Equip]: This program funds the procurement of common Armament Support Equipment (ASE), and Weapons Support Equipment (WSE) under the procurement and inventory control of the Naval Inventory Control Point and the Naval Air Systems Command. This budget line supports: (a) initial outfitting for all in-production weapons systems; (b) procurement of new Support Equipment, and (c) procurement of replacement items for obsolete Support Equipment. These items support sustained operations and surge deployments of the CV battle groups. Shipboard/Shorebased WSE is utilized by weapons departments to handle, transport, and maintain weapons. Shipboard/Shorebased ASE is utilized by squadrons and supporting activities to load and service aircraft weapons and guns. [P5 - 3 / Air Launch & Recovery Equip]: This program provides for the procurement of aircraft launch, recovery, visual landing aids, and related information systems as well as ancillary items required for installation aboard aircraft carriers, air capable combatant vessels, amphibious assault ships and shore stations. Baseline funding is required for support of 55 ALRE equipment systems. Major categories of ALRE systems support include: Launcher, Recovery, Information Systems, Visual Landing Aides (VLA), and Aviation Data Management and Control System (ADMACS) Modernization and Marine Aviation Data Management System (MADMS). This program funds multiple ECPs to rectify critical obsolescence items, resolve evolving Cybersecurity upgrades to correct deficiencies identified through the National Defense Authorization Act (NDAA) mandated risk assessment process, and to implement technical refresh of critical out of production ALRE systems. ALRE is unique in nature in that systems are very seldom sun downed. Several current Visual Landing Aid (VLA), Launcher and Recovery systems require significant investment due to obsolete 1960's technology. The program is working modernization and optimization efforts of Aircraft Launch and Recovery Equipment (ALRE) across all FORD Class and Nimitz Class CVNs, ACS Ships, L-Class Amphibious Assault Ship (AAS) platforms and Marine Corps expeditionary and land-based training facilities. This directly support Marine Aviation (MA) per the Commandants Planning Guidance 39 (CPG-39) and Force Design 2030. The ALRE systems onboard these vessels are antiquated, have diminishing supportability, and require modernization and optimization with benefits of 21st century technology, that will allow us to keep pace and ensure wartime superiority against near peer competitor of major weapons system. ALRE is the backbone of lethality on deploying Navy and Marine Corp weapons systems. The program will divest legacy capabilities, which do not meet current and future requirements. Modernization plans include Commercial Off-The-Shelf (COTS) systems, data automation, and enhanced situational awareness capabilities utilizing industry partners providing technology for system integration and greater cyber resiliency. The modernization focus areas will enable CPG 39 and Force Design 2030 execution ensuring USMC advantages over our peer competitors. ALRE procurements are initiated due to a variety of reasons including fleet-generated reports associated with safe and reliable operations of existing equipment, support of fixed and rotary wing aircraft on Air Capable Ships, and maintaining reliability, availability and maintainability of ALRE equipment. Engineering Change Proposals (ECPs) are generated and processed via a Configuration Control Board. Once approved, the ECP final product is a service change kit. These kits are identified for installation aboard applicable ships as well as shore-based installations in the ECP. Major shipboard equipment items are generally installed by shipyard personnel, alteration installation teams or fleet readiness centers voyage repair teams during routine or restricted availabilities of the various ships. Service change kits support corrective actions that result from changes in operational conditions, obsolescence, and improvements in reliability, availability and maintainability. [P3A / LAMPS MK III - SRQ(KU)-4 (S1010)]: P3A - 4 / LAMPS MK III - SRQ(KU)-4 (S1010)]: LAMPS MK III, AN/SRQ-4 (Ku), is an over the horizon information communications system with a high-speed, bidirectional, digital data link that transmits data from MH-60 helicopters to surface ships (cruisers and destroyers) to provide data, imagery, acoustic, electronic support measures, communications, and radar information to the warfighter via the Ku-band link. [P3A - 2 / CMV22]: CMV-22 - CMV-22 is replacing the C-2 as the Carrier On-board Delivery (COD) platform. Funding provides for the modification of CVN ships in support of approved CMV-22 Ship Change Documents (SCD). These modifications will allow for fire suppressant compliance, blade storage, and space modification necessary to support the CMV-22 mission. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 2 of 32 P-1 Line #96 Volume 3 - 46 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604112N, 0604530N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Expeditionary Airfields P-5a - / 253.815 - / 14.843 - / 14.285 - / 12.998 - / 0.000 - / 12.998 P-5 2 / Acft Rearming Equip P-5a, P-21 - / 120.453 - / 13.871 - / 13.536 - / 12.441 - / 0.000 - / 12.441 P-5 3 / Air Launch & Recovery Equip - / 481.353 - / 72.657 - / 54.218 - / 43.626 - / 0.000 - / 43.626 P-3a 1 / LAMPS MK III - SRQ(KU)-4 (S1010) (Non-Organic) - / 199.857 - / 14.479 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / CMV22 (TBD) / 7.942 - / 5.877 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / INACTIVE PROJECTS (TBD) / 525.578 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost / 121.727 - / 82.039 - / 69.065 - / 0.000 - / 69.065 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 1,588.998 - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Expeditionary Airfields P-5a - / - - / - - / - - / - - / - - / - P-5 2 / Acft Rearming Equip P-5a, P-21 - / - - / - - / - - / - - / - - / - P-5 3 / Air Launch & Recovery Equip - / - - / - - / - - / - - / - - P-3a 1 / LAMPS MK III - SRQ(KU)-4 (S1010) (Non-Organic) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 16.722 P-3a 2 / CMV22 (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 13.819 P-3a 3 / INACTIVE PROJECTS (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 525.578 P-40 Total Gross/Weapon System Cost - / 86.878 - / 87.230 - / 98.236 / 101.270 Continuing - - / / 231.058 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Expeditionary Airfields (EAF) -FY 2027 Expeditionary Airfields funding is required for procurement of EAF Surfacing Equipment, Lighting Equipment, Arresting Gear and associated support costs. VTOL AAP funding is required to procure updated surfacing components and material that enable the war fighter to install and support VTOL operations. Procurement of AM2 matting will continue to be the Airfield Surfacing Solution for main runways and sustainment airfields along with Dual Cone Penetrometer ECP and F70 ECP for complimentary airfield installation equipment. Lighting ALS, RLS, LED Airfield and Lighting Optimization ECPs address the obsolescence and reliability of the currently utilized aging legacy system as well as the CAT I Instrument Flight Rules and Night Vision Device. Additionally, the M31 Expeditionary Arresting Gear provides modernization and replacement of the legacy M31 arresting gear currently facing obsolescence issues. Aircraft Rearming Equipment - FY 2027 baseline funding is required for HLU-288/E/HLU-196 Bomb Hoist Replacement, and associated support costs. Aircraft Launch and Recovery Equipment (ALRE) Information Systems - MA: FY 2027 Marine Aviation funding is required for installation costs of hardware for Moriah Wind Systems ECPs and associated support costs. The ALRE Amphibious Assault Ship (AAS) Information Systems provides modernization of state-of-the-art wind measuring equipment, boundary defense capability and resiliency providing cyber secure operationally available aviation networks. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 3 of 32 P-1 Line #96 Volume 3 - 47 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604112N, 0604530N Line Item MDAP/MAIS Code: N/A The Moriah Wind System and aviation enclave allow data sharing with external systems including Joint Precision Approach and Landing Systems (JPALS) and Navigation Sensor System Interface (NAVSSI) for greater situational awareness in a cyber-secure environment. The modernization of these systems allows more sustainable equipment providing the Combatant Commander and Commanding Officers mission critical data to allow more effective naval expeditionary ARG-MEU operations. Visual Landing Aids: FY 2027 funding is required for additional kit procurements, installs and associated support costs for the following ECPs: IFLOLS Phase 5 ECP, Digital Integrated Launch and Recovery Television Surveillance System (Digital ILARTS), Land-based Optical Landing Aid (LOLA), 1000W Floodlight Conversion to LED and Horizon Reference Set (HRS) Tech Refresh ECP. ILARTS must be updated from an antiquated analog system to a digital system to address numerous equipment obsolescence issues. Analog equipment is no longer available for procurement and if there is no transition to digital data, then CVNs will no longer be able to survey, record, and distribute video of flight deck and surrounding airspace. If LOLA equipment is not procured, then land-based sites will not have shipboard equivalent optical landing aids for pilot training. LOLA has been a top priority request from the Landing Signal Operator (LSO) school for the past ten years. Visual Landing Aids - MA: FY 2027 funding for VLA Marine Aviation is essential to support kit procurements, installations, and associated costs for the Night Vision Device (NVD) Fixture Upgrade and the Advanced Stabilized Glideslope Indicator Next (ASGSI Next), formerly known as the Vertical Short Take-Off and Landing Optical Landing System (VSTOL OLS). The ALRE AAS Visual Landing Aids program focuses on modernizing and optimizing lighting systems for both shipboard and land-based training facilities, ensuring compatibility with Night Vision Devices (NVD) and the F-35B aircraft. These upgrades will enhance Marine Aviation flight operations by increasing operational tempo (OPTEMPO) and accommodating larger squadron sizes aboard LHA/D-class ships, directly supporting the Force Design 2030 initiative for USMC Lightning Carrier CONOPS. This modernization effort is particularly focused on, but not limited to, operations within the USINDOPACOM Theater. The upgrades will provide more sustainable equipment, expand the availability of F-35B night landing zones, and improve pilot compatibility, ultimately enabling more lethal and effective ARG-MEU and Expeditionary Strike Group operations. These advancements align with Joint Strike Fighter 2.0 objectives, ensuring the Marine Corps remains at the forefront of expeditionary and carrier-based aviation capabilities. Visual Landing Aids N95: OPNAV N95 FY 2027 funding is for the procurement of LHA/D Spot 9 kits and associated support costs. The Spot 9 Lighting Upgrade is required to increase existing LHA/D flight deck marking and lighting to provide a second day/night certified F-35B recovery spot to meet requirements cited within the LHA(R) Flight Zero and Flight One AAS Replacement CDD. Spot 9 improves the safety flexibility during night operations by allowing increased ops tempo and enables USN/USMC 'Lighting Carrier' conops vision to be achieved. A second day/night certified F-35B recovery spot will also mitigate operational safety concerns if Spot 7 becomes unavailable due to an aircraft incident or loss of visual landing aids. Launcher: FY 2027 funding is required for continuation of ECP-I-CAT-0517 Improved Nose Gear Launch Deck Tensioner Design and ECP-I-CAT-0582 Improved Digital End Speed Indicator (IDESI). Recovery: FY 2027 funding is required for the continuation of ECP-I-ARC-0455 ARC Long Term Display. ADMACS: FY 2027 funding required for ADMACS ECP-0578 Switch Firewall and Rack redesign (FORD Class only), ECP-603 for Windows and Java Appletts (ATO driver) and Aviation Data Management and Control System (ADMACS) Modernization. MADMS - MA: FY 2027 funding required to continue non-recurring engineering, procure kits and associated support costs for the Marine Aviation Data Management System (MADMS) program. MADMS is the ADMACS Marine Aviation L-Type variant. MADMS provides ALRE modernization of air and flight operations supporting work centers on Amphibious Assault Ships (AAS). Capabilities will respond to the time critical operational need to deploy, employ, sustain, and redeploy aviation assets meeting a cyber-resilient expeditionary environment. Development of MADMS on AAS will support integration of F-35Bs into the ARG/MEU. This system will enable increased F-35B OPTEMPO that maps to CPG-38 and Force Design 2030 enabling USMC lightning carrier CONOPS focused on, but not limited to, USINDOPACOM Theater. This modernized MADMS equipment will permit the Expeditionary Strike Groups (ESG) to communicate with greater efficiency enabling greater situational awareness across the battlefield, accelerated operational decisions and enhancing command and control. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 4 of 32 P-1 Line #96 Volume 3 - 48 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Expeditionary Airfields MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 14.843 14.285 12.998 0.000 12.998 - Gross/Weapon System Cost ($ in Millions) 253.815 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 253.815 Plus CY Advance Procurement ($ in Millions) - - - - - 14.843 14.285 12.998 0.000 12.998 - Total Obligation Authority ($ in Millions) 253.815 FY 2027 Total - - - - - 14.843 14.285 12.998 0.000 12.998 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - (SE010) EAF Surfacing Equipment Cost Recurring Cost 1.1.1) AM-2-Matting (†) (1) (F72) 1.1.2) AM-2 Accessory Packs (1) 1.1.3) Lightweight 9,258.16 12,438 115.153 - 8.785 - - 32 0.331 - 0.000 2.406 0.397 - 0.000 350,556.00 9 3.155 11,312.15 - 33 0.373 - - 0.000 - 0.000 - - 0.000 429,000.00 3 11,312.15 - 33 0.373 - 0.000 17 5.478 1.287 - - 0.000 - 38.274 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 167.690 - - 2.737 - - 3.552 - - 1.660 - - 0.000 - - 1.660 - - 167.690 - - 2.737 - - 3.552 - - 1.660 - - 0.000 - - 1.660 Subtotal: Hardware (SE010) EAF Surfacing Equipment Cost 7 - 37 - (†) (2) 343,714.00 10,723.00 1.1.4) Inactive Projects Matting 322,235.29 10,338.00 429,000.00 3 1.287 Hardware - (SE860) Acceptance Testing and Evaluation - Surfacing Cost Recurring Cost 2.1.1) EAF Surfacing - - 3.332 - - 0.024 - - 0.991 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 3.332 - - 0.024 - - 0.991 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware (SE860) Acceptance Testing and Evaluation - Surfacing Cost - - 3.332 - - 0.024 - - 0.991 - - 0.000 - - 0.000 - - 0.000 Equipment (3) Hardware - (SE020) EAF Lighting Equipment Cost Recurring Cost LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 5 of 32 P-1 Line #96 Volume 3 - 49 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Expeditionary Airfields MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 3.1.1) EAF Lighting Equipment - - 17.101 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 17.101 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 17.101 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.107 - - 0.024 - - 0.028 - - 0.000 - - 0.000 - - 0.000 - - 2.107 - - 0.024 - - 0.028 - - 0.000 - - 0.000 - - 0.000 - - 2.107 - - 0.024 - - 0.028 - - 0.000 - - 0.000 - - 0.000 - - 0.788 - - 0.110 - - 0.155 - - 0.000 - - 0.000 - - 0.000 - - 0.788 - - 0.110 - - 0.155 - - 0.000 - - 0.000 - - 0.000 - - 0.788 - - 0.110 - - 0.155 - - 0.000 - - 0.000 - - 0.000 - - 21.043 - - 2.317 - - 4.332 - - 2.985 - - 0.000 - - 2.985 - - 24.271 - - 4.332 - - 2.021 - - 2.679 - - 0.000 - - 2.679 - - 5.511 - - 4.130 - - 1.971 - - 4.685 - - 0.000 - - 4.685 - - 50.825 - - 10.779 - - 8.324 - - 10.349 - - 0.000 - - 10.349 - - 50.825 - - 10.779 - - 8.324 - - 10.349 - - 0.000 - - 10.349 Subtotal: Hardware (SE020) EAF Lighting Equipment Cost Hardware - Acceptance Testing - Lighting Cost Recurring Cost 4.1.1) EAF Lighting Equipment (4) Subtotal: Recurring Cost Subtotal: Hardware Acceptance Testing Lighting Cost Hardware - Acceptance Testing - Arresting Gear Cost Recurring Cost 5.1.1) EAF Arresting Gear (5) Subtotal: Recurring Cost Subtotal: Hardware Acceptance Testing Arresting Gear Cost Hardware - (SE890) Non- Recurring Engineering Cost Non Recurring Cost 6.1.1) Surfacing Engineering Change Proposals (6) 6.1.2) Lighting Engineering Change Proposals (7) 6.1.3) EAF Engineering Change Proposals (8) Subtotal: Non Recurring Cost Subtotal: Hardware (SE890) Non- Recurring Engineering Cost Support - (SE800) Integrated Logistics Cost LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 6 of 32 P-1 Line #96 Volume 3 - 50 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Expeditionary Airfields MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 7.1) EAF Surfacing Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 4.455 - - 0.440 - - 0.457 - - 0.085 - - 0.000 - - 0.085 - - 0.500 - - 0.036 - - 0.037 - - 0.057 - - 0.000 - - 0.057 7.3) M31 Expeditionary Arresting Gear - - 0.440 - - 0.035 - - 0.037 - - 0.038 - - 0.000 - - 0.038 Subtotal: Support - (SE800) Integrated Logistics Cost - - 5.395 - - 0.511 - - 0.531 - - 0.180 - - 0.000 - - 0.180 - - 1.654 - - 0.185 - - 0.260 - - 0.268 - - 0.000 - - 0.268 - - 1.289 - - 0.229 - - 0.249 - - 0.255 - - 0.000 - - 0.255 - - 3.634 - - 0.244 - - 0.195 - - 0.286 - - 0.000 - - 0.286 Subtotal: Support - (SE830) Production Engineering Cost - - 6.577 - - 0.658 - - 0.704 - - 0.809 - - 0.000 - - 0.809 Gross/Weapon System Cost - - 253.815 - - 14.843 - - 14.285 - - 12.998 - - 0.000 - - 12.998 Equipment (9) 7.2) EAF Lighting Equipment (10) Support - (SE830) Production Engineering Cost 8.1) M31 Expeditionary Arresting Gear 8.2) EAF Lighting Equipment (11) 8.3) EAF Surfacing Equipment (12) Remarks: The quantities of Expeditionary Airfield Surfacing Equipment procured vary depending on the type of matting and service change requirements each year. The equipment, accessories, and service changes are procured and fielded with these funds. Equipment procurements are based on inventory shortfalls, product improvements to fill or correct deficiencies, modernizing EAF equipment to improve availability, maintainability, reliability, supportability, deploy-ability, safety-of-flight, and to keep pace with new aircraft and aircraft systems. EAF's modernization will focus special emphasis on capabilities across the full spectrum of expeditionary military operations, focusing on cross theater deploy-ability, inter-theater mobility, and enabling the community to support day-to-day consequence of being the force-in-readiness. The return on investment of updated equipment will provide commanders the flexibility required to support the ever changing flow on the battlefield. The continual adaptation of new technologies will ensure this program maintains pace with the rest of the world. (†) indicates the presence of a P-5a Footnotes: (1) (2) CE: 1.1.1 AM2 Matting (F72) FY25-27 updated to reflect final negotiated costs. Funding reprioritized by HQMC to support increase in NRE efforts (6.1.1 & 6.1.3) in new ECP's. CE: 1.1.3 Lightweight Matting decrease in FY2027 due to prioritization of Marine Corps efforts across the FYDP reducing efforts in the Sustainment Lighting System (SLS) Constant Current Regulator ECPs and Sustainment Lighting System (SLS) Common Remote ECP. (3) CE: 2.1.1 Surfacing Equipment Acceptance Test & Evaluation decrease in FY2027 due to prioritization of Marine Corps efforts across the FYDP reducing / impacting Surfacing System VSTOL Program Plan ECP, Surfacing Expansion Systems ECP and Cruciform Stake ECP. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 7 of 32 P-1 Line #96 Volume 3 - 51 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Expeditionary Airfields MDAP/MAIS Code: (4) CE: 4.1.1 EAF Lighting Equipment efforts decrease in FY27 due to prioritization of Marine Corps efforts across the FYDP reducing efforts in the Sustainment Lighting System (SLS) Constant Current Regulator ECPs and Sustainment Lighting System (SLS) Common Remote ECP. (5) (6) CE: 5.1.1 EAF Arresting Gear decrease in FY2027 due to prioritization of Marine Corps efforts across the FYDP reducing efforts in Next Generation Arresting Evaluations. CE: 6.1.1 Surfacing Engineering Change Proposals costs moved from (1.1.6) HW line in FY15-31 to correctly capture NRE costs. Surfacing Engineering Change Proposals costs decrease in FY2027 due to prioritization of Marine Corps efforts across the FYDP reducing efforts. Surfacing Engineering Change Proposals supports the procurement of hardware to support multiple Surfacing ECPs and the associated engineering support. Surfacing ECPs are required to adapt to diverse airfield operating environments which drive changes to tool kits necessary for matting installation, accommodating new aircraft heat signatures (i.e. JSF, V22) as well as variable soil compositions. (7) CE:6.1.2 Lighting Engineering Change Proposals costs moved from (3.1.2) HW line in FY15-31 to correctly capture NRE costs. Lighting Engineering Change Proposals address the obsolescence and reliability of the currently utilized aging legacy system as well as the CAT I Instrument Flight Rules and Night Vision Device. FY 2027 increase in funds are required to directly improve and procure Expeditionary Air Fields; Approach lighting, Runway lighting, and commercial Airfield lighting solution hardware, including upgrading commercial ECP solutions. Lighting ECPs will improve readiness and safety to ensure Navy/Marine Corps aircraft can land at night in austere environments. EAF has been directed per HQMC to increase airfield light capability to overcome aging systems and meet updated forward deployment table of basic allowance requirements. COTS LED Airfield Upgrade ECP will provide a more deployable, maneuverable modernized commercial based system that meets the above requirements while allowing procurement at an expeditious rate in-line with the CPG and ASN RDA direction. (8) (9) CE:6.1.3 EAF Engineering Change Proposals (6.1.3) moved from HW line (5.1.1) in FY15-31 to correctly capture NRE costs. Increase in FY2027 directly supports the M31 Expeditionary Arresting Gear ECP. CE:7.1 EAF Surfacing Equipment decrease in FY2027 due to prioritization of Marine Corps efforts across the FYDP reducing / impacting Surfacing System VSTOL Program Plan, Surfacing Expansion Systems ECP and Cruciform Stake ECP. (10) (11) (12) CE:7.2 EAF Lighting Equipment increase in FY2027 due to transportability requirements for ALS, RLS and LED Airfield Lightning Systems. CE:8.2 EAF Lighting Equipment increase in FY2027 due to transportability requirements for ALS, RLS and LED Airfield Lighting Systems. CE:8.3 EAF Surfacing Equipment increase in FY2027 due to VTOL fielding to support Marine Corps efforts. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 8 of 32 P-1 Line #96 Volume 3 - 52 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC]: 1 / Expeditionary Airfields FY Contractor and Location Method/Type or Funding Vehicle 1.1.1) AM-2-Matting (F72) 2022 ALFAB / Enterprise, AL C / FFP LKE Nov 2021 May 2022 364 8,379.12 Y Apr 2018 1.1.1) AM-2-Matting (F72) 2024 ALFAB / Enterprise, AL C / FFP LKE Dec 2023 Jun 2024 2,483 13,423.50 Y Apr 2018 1.1.1) AM-2-Matting (F72) 2025 ALFAB / Enterprise, AL C / FFP LKE Nov 2025 May 2026 32 10,338.00 Y Apr 2018 1.1.1) AM-2-Matting (F72) 2026 ALFAB / Enterprise, AL C / FFP LKE Dec 2025 Jun 2026 37 10,723.00 Y Apr 2018 1.1.1) AM-2-Matting (F72) 2027 ALFAB / Enterprise, AL C / FFP LKE Dec 2026 Jun 2027 33 11,312.15 Y Apr 2018 2023 FAUN TRACKWAY USA INC. / Arlington, VA C / FFP LKE Nov 2023 Apr 2024 7 458,570.00 Y Apr 2023 2024 FAUN TRACKWAY USA INC. / Arlington, VA C / FFP LKE Jan 2024 Jan 2025 10 226,800.00 Y Apr 2023 2025 FAUN TRACKWAY USA INC. / Arlington, VA C / FFP LKE Jan 2025 Jan 2026 7 343,714.00 Y Apr 2023 2026 FAUN TRACKWAY USA INC. / Arlington, VA C / FFP LKE Dec 2025 Dec 2026 9 350,556.00 Y Apr 2023 2027 FAUN TRACKWAY USA INC. / Arlington, VA C / FFP LKE Oct 2026 Oct 2027 3 429,000.00 Y Apr 2023 Cost Elements 1.1.3) Lightweight Matting 1.1.3) Lightweight Matting 1.1.3) Lightweight Matting 1.1.3) Lightweight Matting 1.1.3) Lightweight Matting O O C P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment LI 4213 - Aircraft Support Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 9 of 32 P-1 Line #96 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 3 - 53 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Acft Rearming Equip MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 13.871 13.536 12.441 0.000 12.441 - Gross/Weapon System Cost ($ in Millions) 120.453 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 120.453 Plus CY Advance Procurement ($ in Millions) - - - - - 13.871 13.536 12.441 0.000 12.441 - Total Obligation Authority ($ in Millions) 120.453 FY 2027 Total - - - - - 13.871 13.536 12.441 0.000 12.441 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - HARDWARE - Ordnance Assembly Cost Recurring Cost 1.1.1) SH050 - A/ F32K-1A WEAPONS ASSEMBLY TABLE REPLACEMENT 100,000.00 4 0.400 17,046.67 150 2.557 40,194.00 116 4.663 - - 0.000 - - 0.000 - - 0.000 (†) (13) Subtotal: Recurring Cost Subtotal: Hardware HARDWARE - Ordnance Assembly Cost - - 0.400 - - 2.557 - - 4.663 - - 0.000 - - 0.000 - - 0.000 - - 0.400 - - 2.557 - - 4.663 - - 0.000 - - 0.000 - - 0.000 446 16.024 192 7.270 102 3.811 - - 0.000 - - 0.000 - - 0.000 - - 16.024 - - 7.270 - - 3.811 - - 0.000 - - 0.000 - - 0.000 - - 16.024 - - 7.270 - - 3.811 - - 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.000 1.245 - - 0.000 - - 0.000 - - 0.000 Hardware - HARDWARE - Ordnance Transport Cost Recurring Cost 2.1.1) SH045 MHU-126/202 TRLR REPLACEMENT (MHU-230/M) 35,928.25 37,864.58 37,365.00 (†) (14) Subtotal: Recurring Cost Subtotal: Hardware HARDWARE - Ordnance Transport Cost Hardware - HARDWARE - Ordnance Loading Cost Recurring Cost 3.1.1) SH049 - USMC FARP ORDNANCE LOADING SE (†) (15) - LI 4213 - Aircraft Support Equipment Navy 249,000.00 5 UNCLASSIFIED Page 10 of 32 P-1 Line #96 Volume 3 - 54 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Acft Rearming Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.2) SH051 HLU-288/E/HLU-196 BOMB HOIST Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) - - 0.000 3.1.4) Inactive Projects - - 80.608 - - 0.000 Subtotal: Recurring Cost - - 80.608 - - 0.360 - - 80.608 - - REPLACEMENT 90,000.00 4 0.360 Unit Cost ($) 50,462.00 FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) 54 2.725 50,039.65 - - 0.000 - - - 3.970 - 0.360 - - 3.970 FY 2027 OOC Total Cost Qty (Each) ($ M) 227 Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) 50,039.65 Total Cost Qty (Each) ($ M) 11.359 - - 0.000 227 11.359 - 0.000 - - 0.000 - - 0.000 - 11.359 - - 0.000 - - 11.359 - - 11.359 - - 0.000 - - 11.359 (†) (16) Subtotal: Hardware HARDWARE - Ordnance Loading Cost Hardware - SH920 NON-RECURRING Cost Non Recurring Cost 4.1.1) Ordnance Loading NRE - - 3.188 - - 1.425 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 3.188 - - 1.425 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - SH920 NON-RECURRING Cost - - 3.188 - - 1.425 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.1) Ordnance Transport ECP - - 3.166 - - 0.230 - - 0.000 - - 0.000 - - 0.000 - - 0.000 5.1.2) Ordnance Loading ECP - - 1.167 - - 0.200 - - 0.092 - - 0.093 - - 0.000 - - 0.093 Subtotal: Recurring Cost - - 4.333 - - 0.430 - - 0.092 - - 0.093 - - 0.000 - - 0.093 Subtotal: Hardware - SH010 ECP Cost - - 4.333 - - 0.430 - - 0.092 - - 0.093 - - 0.000 - - 0.093 Hardware - SH010 ECP Cost Recurring Cost Hardware - SH860 Acceptance Test & Eval Cost Recurring Cost 6.1.1) Ordnance Assembly Acceptance Testing - - 0.357 - - 0.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.1.2) Ordnance Transport Acceptance Testing - - 1.803 - - 0.126 - - 0.098 - - 0.000 - - 0.000 - - 0.000 6.1.3) Ordnance Loading Acceptance Testing - - 1.927 - - 0.200 - - 0.120 - - 0.203 - - 0.000 - - 0.203 Subtotal: Recurring Cost - - 4.087 - - 0.526 - - 0.218 - - 0.203 - - 0.000 - - 0.203 Subtotal: Hardware - SH860 Acceptance Test & Eval Cost - - 4.087 - - 0.526 - - 0.218 - - 0.203 - - 0.000 - - 0.203 LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 11 of 32 P-1 Line #96 Volume 3 - 55 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Acft Rearming Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Support - SH800 ILS Cost 7.1) Ordnance Assembly ILS - - 0.628 - - 0.126 - - 0.082 - - 0.000 - - 0.000 - - 0.000 7.2) Ordnance Transport ILS - - 1.790 - - 0.126 - - 0.082 - - 0.000 - - 0.000 - - 0.000 7.3) Ordnance Loading ILS - - 2.317 - - 0.126 - - 0.082 - - 0.207 - - 0.000 - - 0.207 Subtotal: Support - SH800 ILS Cost - - 4.735 - - 0.378 - - 0.246 - - 0.207 - - 0.000 - - 0.207 Support - SH830 Production Engineering Cost 8.1) Ordnance Assembly PE - - 1.375 - - 0.300 - - 0.268 - - 0.000 - - 0.000 - - 0.000 8.2) Ordnance Transport PE - - 2.789 - - 0.320 - - 0.000 - - 0.000 - - 0.000 - - 0.000 8.3) Ordnance Loading PE - - 2.914 - - 0.305 - - 0.268 - - 0.579 - - 0.000 - - 0.579 Subtotal: Support - SH830 Production Engineering Cost - - 7.078 - - 0.925 - - 0.536 - - 0.579 - - 0.000 - - 0.579 Gross/Weapon System Cost - - 120.453 - - 13.871 - - 13.536 - - 12.441 - - 0.000 - - 12.441 (†) indicates the presence of a P-5a Footnotes: (13) (14) CE 1.1.1 IWAS efficiencies realized from an accelerated production schedule created per-unit cost savings, which were reprogrammed to fund a higher-priority CE 3.1.2 Bomb Hoist procurement in FY27. FY27 CE 2.1.1 MHU-230 QTY requirements were reduced due to an accelerated production schedule executed in FY25. This acceleration was resourced through an internal realignment of FY25 funds with RO concurrence. (15) (16) CE 3.1.1 FARP FY27 and FY28 funds were reprogrammed from an effort delayed pending requirements validation to address a critical CE 3.1.2 Bomb Hoist requirement. Funds were realigned from CE 3.1.1 FARP program delayed pending requirements validation to procure a critical joint Navy and USMC CE 3.1.2 Bomb Hoist capability in FY27 and FY28. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 12 of 32 P-1 Line #96 Volume 3 - 56 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Acft Rearming Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 1.1.1) SH050 - A/F32K-1A WEAPONS ASSEMBLY TABLE REPLACEMENT 2024 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Aug 2024 Feb 2025 4 100,000.00 Y Apr 2024 1.1.1) SH050 - A/F32K-1A WEAPONS ASSEMBLY TABLE REPLACEMENT 2025 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Aug 2025 Feb 2026 150 17,046.67 Y Apr 2024 1.1.1) SH050 - A/F32K-1A WEAPONS ASSEMBLY TABLE REPLACEMENT 2026 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Aug 2026 Feb 2027 116 40,194.00 Y Apr 2024 2.1.1) SH045 - MHU-126/202 TRLR REPLACEMENT - (MHU-230/M) 2024 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Oct 2023 Jul 2024 280 35,037.00 Y Nov 2020 2.1.1) SH045 - MHU-126/202 TRLR REPLACEMENT - (MHU-230/M) 2025 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Oct 2024 Jul 2025 192 37,864.58 Y Nov 2020 2.1.1) SH045 - MHU-126/202 TRLR REPLACEMENT - (MHU-230/M) 2026 CHOCTAW DEFENSE / McALESTER, OK C / FFP NAWCADLKE Oct 2025 Jul 2026 102 37,365.00 Y Nov 2020 3.1.1) SH049 - USMC FARP ORDNANCE LOADING SE 2026 TBD / TBD C / FFP NAWCADLKE Jun 2026 Dec 2026 5 249,000.00 Y Feb 2026 2025 TBD / TBD C / FFP NAWCADLKE Sep 2025 Mar 2026 4 90,000.00 Y 2026 TBD / TBD C / FFP NAWCADLKE Jan 2026 Jul 2026 54 50,462.00 Y 2027 TBD / TBD C / FFP NAWCADLKE Jan 2027 Jul 2027 227 50,039.65 Y 3.1.2) SH051 - HLU-288/ E/HLU-196 BOMB HOIST REPLACEMENT (†) 3.1.2) SH051 - HLU-288/ E/HLU-196 BOMB HOIST REPLACEMENT (†) 3.1.2) SH051 - HLU-288/ E/HLU-196 BOMB HOIST REPLACEMENT (†) O O C P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment (†) (Each) indicates the presence of a P-21 LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 13 of 32 P-1 Line #96 Volume 3 - 57 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Acft Rearming Equip Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T 3.1.2) SH051 - HLU-288/E/HLU-196 BOMB HOIST REPLACEMENT 1 2025 NAVY 4 0 4 1 2026 NAVY 54 0 54 1 2027 NAVY 227 0 227 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (16) A - 4 54 227 O C T LI 4213 - Aircraft Support Equipment Navy Fiscal Year 2025 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #96 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 58 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Acft Rearming Equip Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V 3.1.2) SH051 - HLU-288/E/HLU-196 BOMB HOIST REPLACEMENT 1 2025 NAVY 4 0 4 1 2026 NAVY 54 0 54 1 2027 NAVY 227 0 227 J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (16) - - - - - A - - 1 1 - 1 - 1 - 0 - 4 5 4 5 4 5 4 5 A O C T LI 4213 - Aircraft Support Equipment Navy D E C B A L A N C E Fiscal Year 2027 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 32 S E P O C T N O V D E C J A N 4 F E B P-1 Line #96 5 M A R 4 A P R 5 M A Y 0 J U N 19 J U L 19 A U G 19 170 S E P Volume 3 - 59 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Acft Rearming Equip Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V 3.1.2) SH051 - HLU-288/E/HLU-196 BOMB HOIST REPLACEMENT 1 2025 NAVY 4 4 0 1 2026 NAVY 54 54 0 1 2027 NAVY 227 57 170 D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (16) 0 0 19 O C T LI 4213 - Aircraft Support Equipment Navy Fiscal Year 2029 19 N O V 19 D E C 19 J A N 19 F E B 19 M A R 19 A P R 19 M A Y 18 J U N 0 J U L A U G UNCLASSIFIED Page 16 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #96 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 60 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Item Number / Title [DODIC]: 2 / Acft Rearming Equip Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 TBD - TBD 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 17 of 32 P-1 Line #96 Volume 3 - 61 0 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 72.657 54.218 43.626 0.000 43.626 - Gross/Weapon System Cost ($ in Millions) 481.353 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 481.353 Plus CY Advance Procurement ($ in Millions) - - - - - 72.657 54.218 43.626 0.000 43.626 - Total Obligation Authority ($ in Millions) 481.353 FY 2027 Total - - - - - 72.657 54.218 43.626 0.000 43.626 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - SJ040 - Service Change Kits Cost Recurring Cost 1.1.1) Visual Landing Aids (17) - - 57.141 - - 3.839 - - 10.000 - - 8.071 - - 0.000 - - 8.071 1.1.2) VLA - MA (18) - - 0.957 - - 0.202 - - 0.410 - - 0.800 - - 0.000 - - 0.800 1.1.3) Launcher (19) - - 9.509 - - 1.887 - - 1.295 - - 1.286 - - 0.000 - - 1.286 1.1.4) Recovery (20) - - 36.212 - - 7.525 - - 4.906 - - 0.384 - - 0.000 - - 0.384 1.1.5) ADMACS (21) - - 0.000 - - 0.000 - - 1.821 - - 0.325 - - 0.000 - - 0.325 - - 0.491 - - 4.154 - - 0.000 - - 2.467 - - 0.000 - - 2.467 - - 0.000 - - 1.400 - - 0.357 - - 0.300 - - 0.000 - - 0.300 - - 0.000 - - 0.000 - - 0.000 - - 1.200 - - 0.000 - - 1.200 1.1.6) MADMS - MA (22) 1.1.7) Visual Landing Aids N95 (23) 1.1.8) Information Systems MA (24) 1.1.9) Inactive Projects - - 38.723 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 143.033 - - 19.007 - - 18.789 - - 14.833 - - 0.000 - - 14.833 Subtotal: Hardware - SJ040 - Service Change Kits Cost - - 143.033 - - 19.007 - - 18.789 - - 14.833 - - 0.000 - - 14.833 - 1.251 - - 0.076 - - 0.077 - - 0.000 - - 0.000 - - 0.000 Hardware - SJ305 - Non-Recurring Engineering Cost Non Recurring Cost 2.1.1) Information Systems - MA - LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 18 of 32 P-1 Line #96 Volume 3 - 62 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) 2.1.2) Visual Landing Aids (25) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 43.915 - - 3.664 - - 1.744 - - 0.350 - - 0.000 - - 0.350 2.777 - - 4.224 - - 6.452 - - 1.845 - - 0.000 - - 1.845 2.1.3) VLA - MA (26) - - 2.1.4) Launcher (27) - - 9.262 - - 0.976 - - 0.665 - - 0.342 - - 0.000 - - 0.342 2.1.5) Recovery (28) - - 40.004 - - 3.865 - - 4.056 - - 1.846 - - 0.000 - - 1.846 (29) - - 10.251 - - 2.908 - - 0.000 - - 1.712 - - 0.000 - - 1.712 2.1.7) Inactive Projects 2.1.6) MADMS - MA - - 43.381 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 150.841 - - 15.713 - - 12.994 - - 6.095 - - 0.000 - - 6.095 Subtotal: Hardware - SJ305 - Non-Recurring Engineering Cost - - 150.841 - - 15.713 - - 12.994 - - 6.095 - - 0.000 - - 6.095 Software - Product Improvement Cost Recurring Cost (30) - - 38.342 - - 5.709 - - 2.481 - - 2.602 - - 0.000 - - 2.602 Subtotal: Recurring Cost - - 38.342 - - 5.709 - - 2.481 - - 2.602 - - 0.000 - - 2.602 Subtotal: Software - Product Improvement Cost - - 38.342 - - 5.709 - - 2.481 - - 2.602 - - 0.000 - - 2.602 - - 0.179 - - 0.058 - - 0.061 - - 0.058 - - 0.000 - - 0.058 3.1.1) ADMACS Support - SJ800 - Integrated Logistics Cost 4.1) Information Systems - MA (31) 4.2) Visual Landing Aids - - 6.738 - - 0.427 - - 1.103 - - 1.125 - - 0.000 - - 1.125 4.3) VLA - MA (33) - - 0.099 - - 0.106 - - 0.109 - - 0.111 - - 0.000 - - 0.111 4.4) Launcher (34) - - 1.844 - - 0.368 - - 0.333 - - 0.340 - - 0.000 - - 0.340 4.5) Recovery (35) - - 5.941 - - 0.221 - - 0.347 - - 0.354 - - 0.000 - - 0.354 - - 0.954 - - 0.062 - - 0.064 - - 0.065 - - 0.000 - - 0.065 - - 0.727 - - 0.800 - - 0.000 - - 0.121 - - 0.000 - - 0.121 (32) 4.6) ADMACS 4.7) MADMS - MA (36) 4.8) Visual Landing Aids - - 0.000 - - 0.000 - - 0.000 - - 0.064 - - 0.000 - - 0.064 4.9) Inactive Projects - - 5.331 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - SJ800 Integrated Logistics Cost - - 21.813 - - 2.042 - - 2.017 - - 2.238 - - 0.000 - - 2.238 N95 (37) Support - SJ830 - Production Engineering Cost LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 19 of 32 P-1 Line #96 Volume 3 - 63 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 5.1) Information Systems - MA (38) 5.2) Visual Landing Aids (39) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 0.419 - - 0.771 - - 0.745 - - 0.554 - - 0.000 - - 0.554 - - 15.030 - - 1.361 - - 1.127 - - 1.234 - - 0.000 - - 1.234 5.3) VLA - MA (40) - - 0.688 - - 0.024 - - 0.047 - - 0.065 - - 0.000 - - 0.065 5.4) Launcher (41) - - 2.983 - - 0.341 - - 0.370 - - 0.377 - - 0.000 - - 0.377 5.5) Recovery (42) - - 8.189 - - 0.436 - - 0.633 - - 0.646 - - 0.000 - - 0.646 5.6) ADMACS (43) - - 5.960 - - 3.364 - - 3.257 - - 2.204 - - 0.000 - - 2.204 - - 1.091 - - 0.815 - - 0.000 - - 0.831 - - 0.000 - - 0.831 - - 0.000 - - 0.000 - - 0.000 - - 0.898 - - 0.000 - - 0.898 5.9) Inactive Projects - - 10.025 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - SJ830 Production Engineering Cost - - 44.385 - - 7.112 - - 6.179 - - 6.809 - - 0.000 - - 6.809 - - 1.085 - - 0.195 - - 0.250 - - 0.292 - - 0.000 - - 0.292 5.7) MADMS - MA (44) 5.8) Visual Landing Aids N95 (45) Support - SJ900 - Installation -NonFMP Cost 6.1) Visual Landing Aids (46) (47) - - 0.197 - - 0.150 - - 0.100 - - 0.000 - - 0.000 - - 0.000 6.3) MADMS MA - - 0.000 - - 3.801 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.4) Inactive Projects - - 1.472 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - SJ900 Installation -NonFMP Cost - - 2.754 - - 4.146 - - 0.350 - - 0.292 - - 0.000 - - 0.292 6.2) VLA - MA Support - SJ910 - Installation -FMP Cost 7.1) Visual Landing Aids (48) - - 20.722 - - 5.998 - - 4.869 - - 3.209 - - 0.000 - - 3.209 7.2) Information Systems - - 19.344 - - 0.053 - - 0.012 - - 0.000 - - 0.000 - - 0.000 0.965 - - 2.020 - - 0.970 - - 0.687 - - 0.000 - - 0.687 7.3) Information Systems - - 7.4) VLA - MA (50) - - 0.473 - - 1.082 - - 0.996 - - 0.075 - - 0.000 - - 0.075 7.5) Launcher (51) - - 10.198 - - 1.691 - - 0.474 - - 0.419 - - 0.000 - - 0.419 7.6) Recovery (52) - - 14.532 - - 2.576 - - 0.977 - - 0.773 - - 0.000 - - 0.773 7.7) ADMACS (53) - - 12.511 - - 5.176 - - 2.517 - - 5.049 - - 0.000 - - 5.049 - - 0.000 - - 0.332 - - 0.593 - - 0.545 - - 0.000 - - 0.545 - MA (49) 7.8) Visual Landing Aids N95 (54) LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 20 of 32 P-1 Line #96 Volume 3 - 64 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 7.9) Inactive Projects - - 1.440 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - SJ910 Installation -FMP Cost - - 80.185 - - 18.928 - - 11.408 - - 10.757 - - 0.000 - - 10.757 Gross/Weapon System Cost - - 481.353 - - 72.657 - - 54.218 - - 43.626 - - 0.000 - - 43.626 Remarks: [Hardware/Recurring] The recurring hardware funding shown is a combination of many planned hardware upgrades to a variety of Aircraft Launch and Recovery Systems and to a variety of ships/classes including Carrier Vessel Nuclear (CVNs), Amphibious Assault Ships (AAS), and Air Capable Ships (ACS), which include various unit costs/quantities for differing fiscal years. As such, hardware recurring costs will vary significantly year to year and within each item. [Hardware/Non-Recurring] Non-Recurring Engineering costs are associated with design, development, systems test and evaluation, tooling, logistics, systems engineering and project management of hardware or software Engineering Changes. [Support Cost] Integrated Logistics Support costs are associated with the non-level of effort (organic) labor at NAWCAD Lakehurst directly supporting the manufacture of hardware, assembly kits and installation kits for many of the service changes. [Support Cost] Installation Support: 1. Installations are subject to change with ship availability schedules. 2. The year-to-year unit installations costs will vary and can exceed the projected yearly inflation rate due to the hardware installation cost being dependent on quantity and location of the ship (i.e. Norfolk, Japan), ship class (DDG, ACS, AAS, CVN), and the ships baseline configuration. 3. Production lead time includes pre-installation checkout, kitting with other installation hardware and drawings, and time to ship the hardware to the installation site. Footnotes: (17) (18) (19) (20) (21) (22) (23) (24) (25) CE:1.1.1 Visual Landing Aids HW: Decreased hardware costs in FY27 due to procuring less Land based Optical Landing Aid (LOLA) units and no longer procuring 1000W Floodlight Conversion to LED units. CE:1.1.2 VLA MA HW: Increased hardware costs in FY27 due to Advanced Stabilized Glideslope Indicator Next (ASGSI Next) previously known as VSTOL OLS Tech Refresh val/ver kit procurements. CE:1.1.3 Launcher HW: FY27 costs for ECP-I-CAT-0517 Improved Nose Deck Launch Deck Tensioner Design and ECP-I-CAT-0582 Accelerated IDESI. CE:1.1.4 Recovery HW: Decrease in FY27 costs for ARC Long Term Display lab assets only, ship set buys will resume in FY28 and out. CE:1.1.5 ADMACS HW: FY27 costs for ECP-0603 Windows and Java Applets. CE:1.1.6 MADMS MA HW: Increase in FY27 begins funding MADMS Hardware. CE:1.1.7 Visual Landing Aids N95 HW: FY27 funding provided for the LHA/D Spot 9 Lighting Upgrade. CE:1.1.8 Information Systems MA HW: FY27 funding provided for ECP 600 Network Rack Redesign. CE:2.1.2 Visual Landing Aids NRE: Decreased cost in FY27 due to NRE completion on the Improved Fresnel Lens Optical Landing System (IFLOLS) Phase 5. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 21 of 32 P-1 Line #96 Volume 3 - 65 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: (26) CE:2.1.3 VLA MA NRE: Decreased cost in FY27 due to completion of NRE required for NVD Fixture Upgrade ECP. Continue FY27 NRE cost required to support Advanced Stabilized Glideslope Indicator Next (ASGSI Next) previously VSTOL OLS Tech Refresh (27) (28) (29) CE:2.1.4 Launcher NRE: Decreased cost in FY27 due to completed NRE for ECP-I-JBD-0377 JSF JBD. Continued FY27 NRE costs for ECP-I-CAT-0582 Accelerated IDESI. CE:2.1.5 Recovery NRE: Decrease in FY27 costs due to concluding ARC Long Term Display NRE. CE:2.1.6 MADMS-MA NRE: FY27 NRE is to support hardware requirements to develop requirements and design the network to include addressing High and Low sides for Marine Aviation Data Management System (MADMS). (30) (31) (32) (33) (34) (35) (36) (37) (38) (39) (40) CE:3.1.1 ADMACS Product Improvement: Software support efforts for ADMACS ECP 603 Windows and Java Appletts. CE:4.1 Information Systems MA ILS: FY27 costs to support ECP 500 Aviation Launch and Land Enclave (ALLE) and ECP 600 Network Rack Redesign. CE:4.2 Visual Landing Aids ILS: FY27 costs to support DILARTS, LOLA and IFLOLS Phase 5 Upgrade. CE:4.3 VLA MA ILS: ILS costs in FY27 for Advanced Stabilized Glideslope Indicator Next (ASGSI Next) previously VSTOL OLS Tech Refresh and Night Vision Device (NVD) Fixture upgrade ECP 570. CE:4.4 Launcher ILS: FY27 funds ECP-I-CAT-0517 Improved Nose Deck Launch Deck Tensioner Design and ECP-I-CAT-0582 Accelerated IDESI. CE:4.5 Recovery ILS: FY27 support for the ARC Long Term Display. CE:4.7 MADMS MA ILS: ILS support in FY27 for hardware changes to support Marine Aviation Data Management System (MADMS). CE:4.8 Visual Landing Aids ILS: FY27 ILS funds LHA/D Spot 9 Lighting Upgrade. CE:5.1 Information Systems MA PE: FY27 funds Moriah Cyber Enclave ECP 0500 and Network Rack Redesign ECP 0600. CE:5.2 Visual Landing Aids PE: FY27 funds Landbased Optical Landing Aid (LOLA), Digital ILARTS and ECP-I-IFLOLS-0569 IFLOLS Phase 5 Upgrade. CE:5.3 Visual Landing Aids MA PE: Funding to support Advanced Stabilized Glideslope Indicator Next (ASGSI Next) previously VSTOL OLS Tech Refresh and Night Vision Device (NVD) Fixture Upgrade ECP 570. (41) (42) (43) (44) (45) (46) (47) (48) (49) (50) (51) (52) (53) CE:5.4 Launcher PE: FY27 required in support of Improved Nose Gear Launch Deck Tensioner and Accelerated IDESI ECP-I-CAT-0582. CE:5.5 Recovery PE: supports ARC Long Term Display. CE:5.6 ADMACS PE: to support ECP 0603 Windows and Java Applets and continuous ADMACS software improvement updates and system releases. CE:5.7 MADMS MA PE: Engineering to support hardware procurements for Marine Aviation Data Management System (MADMS). CE:5.8 Visual Landing Aids N95 PE: FY27 Production Engineering is to support LHA/D Spot 9 Lighting Upgrade. CE:6.1 VLA Install Non FMP: FY27 funds to support ECP-I-VLA-0564 1000W Conversion to LED. CE:6.2 VLA MA Install Non FMP: Decrease in FY27 funds due to completion of ALS-CPS ECP-I-VLA-0256. CE:7.1 VLA FMP Install: FY27 funding required for Digital ILARTS, LOLA, IFLOLS Phase 5 and ECP-I-VLA-0564 1000W Conversion to LED. CE:7.3 Information Systems MA FMP Install: FY27 costs to support ECP 500 ALLE and LPD/LCC Retrofit Modernization ECP. CE:7.4 VLA MA FMP Install: Decrease in FY27 due to completion of ALS CPS ECP-I-VLA-0256 Installs in FY26. Continued FY27 funding required for NVD Fixture Upgrade. CE:7.5 Launcher FMP Install: FY27 funding required ECP-I-CAT-0517 Improved Nose Gear Launch Deck Tensioner. CE:7.6 Recovery FMP Install: FY27 funding to complete ARC Long Term Display installations. CE:7.7 ADMACS FMP Install: FY27 FMP Install increase is to support system release, including ECP 0578 Switch and Firewall and ECP 0603 Windows and Java Appletts onboard five ships. System Release Upgrade installs occur once a year for 3 or more CVNs. System Release Upgrades addresses software, cybersecurity, and obsolescence, and installs on CVNs available when an update is complete and ready for release. Unit cost varies from ship to ship and across years due to the individual ship and length of ship availability, since ADMACS software generated is unique to an individual ship to accommodate ship specific spaces (i.e. magazines are mapped to an individual ship's layout). Install schedule is determined by the timeframe constraints of each ship's availability, plus the unique modification LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 22 of 32 P-1 Line #96 Volume 3 - 66 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Air Launch & Recovery Equip MDAP/MAIS Code: of software for those ships, and coordination of installs for multiple ships available in that year. The time from procurement to installation varies due to: 1) constantly shifting CVN availabilities, and 2) the need to bundle procurements of several kits and do obsolescence upgrade ECPs for each bundle. ADMACS installs require at least a 6 month ship availability. (54) CE:7.8 Visual Landing Aids N95 FMP Install: FY27 funding provided for the LHA/D Spot 9 Lighting Upgrade. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 23 of 32 P-1 Line #96 Volume 3 - 67 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / LAMPS MK III - SRQ(KU)-4 (S1010) MDAP/MAIS Code: Prior Years 199.857 199.857 199.857 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 14.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.722 - - - - - - - - - - 14.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.722 - - - - - - - - - - 14.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.722 Total 231.058 231.058 231.058 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: LAMPS MK III, AN/SRQ-4 (Ku), is an over the horizon information dominance system with a high speed, air-to-ground, digital data link that transmits data from MH-60 helicopters to surface ships (cruisers and destroyers) to enable data, imagery, acoustic, electronic support measures, communications and radar information via the Ku-band link. Program provides for non-recurring engineering and associated installation and support of AN/SRQ-4(Ku) field install kits. This system encompasses hardware and software to transmit sensor data from the Light Airborne Multi-Purpose System (LAMPS) MK III MH-60R aircraft to the host ship classes. Kit procurements were complete in FY 2021. Objective Inventory is 100 kits. (68 Destroyers [DDGs], 22 Cruisers [CGs], & 10 Shore sites). 22 kits were previously installed in line item 4255 and 78 kits are planned for installation in line item 4213. Seven of the kits in "To Complete" represent pending decommissioning of DDGs and CGs. Notes for installation schedule: 1. Installations are subject to changes with ship availability schedules. 2. The year-to-year unit installation cost varies significantly and can exceed the projected yearly inflation rate. The varying unit cost is due to the hardware installation cost being dependent on quantity, location (i.e., Japan, Norfolk, San Diego, etc.), Shipyard (i.e. Bath or Ingalls), ship baseline configuration (i.e., Navigation System installed, A-Kit pre-install), ship availability (AVAIL) period overlaps, complexity of AVAIL (e.g., SHIPALTs can last up to 3 yrs and require intermittent visits by the install team) as well as cost sharing from other simultaneous installed SHIPALTS (e.g. mast rigging). LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 24 of 32 P-1 Line #96 Volume 3 - 68 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LAMPS MK III - SRQ(KU)-4 (S1010) MDAP/MAIS Code: Models of Systems Affected: LAMPS MK III Modification Type: Non-Organic Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: LAMPS MK III - SRQ(KU)-4 (S1010) B Kits Recurring 1.1.1) SRQ(KU)-4 - NonOrganic (55) Subtotal: Recurring 78 / 69.406 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 69.406 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / / 0.000 - 78 / 69.406 / 69.406 - Non-Recurring 1.2.1) NRE - Organic - / 3.111 - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Non-Recurring - / 3.111 - / - - / - - / - - / - - / - - / - - / - - / - - / - 78 / 72.517 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 72.517 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Subtotal: LAMPS MK III - SRQ(KU)-4 (S1010) Subtotal: Procurement, All Modification Items - - / - - / 3.111 / 0.000 - / 3.111 / / 0.000 78 / 72.517 / 72.517 - Support (All Modification Items) 2.1) Data (56) 2.2) Support Equipment (57) 2.3) ILS - / 6.848 - / 1.012 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 9.796 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / 17.355 - / 1.759 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 1.794 - - / 1.032 - / - - / 8.892 / 9.796 / 20.908 / 21.059 - / 4.010 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 4.116 2.5) Acceptance Test & Evaluation - / 1.607 - / 0.227 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.232 - / 2.066 2.6) GFE - / 5.033 - / 0.287 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.388 - / 5.708 2.7) Production Line Support - / 7.732 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / - - - / 69.430 - / 7.295 Modification Item 1 of 1: LAMPS MK III - SRQ(KU)-4 (S1010) - / 57.910 - / 7.184 Subtotal: Installation - / 57.910 - / 7.184 2.4) Government Engineering (58) Subtotal: Support - - - / - - / - / - - - / - - / - - / - - / - - - / 29.185 / 7.732 / - - / 7.562 - / 84.287 / 0.000 - / 9.160 - / 74.254 / - - / 9.160 - / 74.254 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 4213 - Aircraft Support Equipment Navy 199.857 14.479 0.000 0.000 0.000 UNCLASSIFIED Page 25 of 32 0.000 0.000 0.000 P-1 Line #96 0.000 0.000 16.722 231.058 Volume 3 - 69 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LAMPS MK III - SRQ(KU)-4 (S1010) MDAP/MAIS Code: Modification Item 1 of 1: LAMPS MK III - SRQ(KU)-4 (S1010) Manufacturer Information Manufacturer Name: L3 Communications Manufacturer Location: Salt Lake City, Utah Administrative Leadtime (in Months): 4 Dates Production Leadtime (in Months): 22 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: NAWCAD St. Inigoes Installation Team:: Installation Name: AN/SRQ-4 Installations Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 60 / 57.910 10 / 9.160 78 / 74.254 Prior Years 8 / 7.184 - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 7.184 - / - - / - - / - - / - - / - - / - - / - - / - Total 60 / 57.910 10 / 9.160 78 / 74.254 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 60 2 2 2 2 - - - - - - - - - - - - - - - - - - - - - - - - 10 78 Out 55 2 2 1 - - - - - - - - - - - - - - - - - - - - 10 78 - 2 2 2 2 Footnotes: (55) (56) Installs: Reconciliation of actual ship installations has resulted in ten installs in "to complete". Seven ships pending Decommissioning and part of the "To Complete" installs. Cost Element 2.1, Data funding procures ship installation drawings and provides for ship checks on multiple Cruiser (CG) and Destroyers (DDG) class ships scheduled for SHIPALT 79719. This cost element provides the funds to procure the data packages eighteen months prior to ship installation start. Data costs vary year to year due to CG packages being significantly more expensive as compared to DDGs due to the age and individuality of the CGs. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 26 of 32 P-1 Line #96 Volume 3 - 70 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LAMPS MK III - SRQ(KU)-4 (S1010) MDAP/MAIS Code: (57) Cost Element 2.2, Support Equipment is for the procurement of KU-Band equipment for the fleet to replace the Test Set-4120s that allows trouble shooting of the LAMPS MK III system without an embarked helicopter. (58) Cost Element 2.4, Government Engineering, is required for engineering support for kitting, staging, configuration/documentation management, procurement of GFE & support equipment, scheduling of ship installation activities, and test support required to produce, deliver and install the SRQ(KU)-4 kits onboard CG and DDG class ships. FY25 increase is required to support the installation efforts which continue into FY26 as installs are phased based on other concurrent ship activity/installs and ship checks. Close out activity required. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 27 of 32 P-1 Line #96 Volume 3 - 71 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / CMV22 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 7.942 5.877 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 13.819 Total - - - - - - - - - - - - 7.942 5.877 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 13.819 - - - - - - - - - - - - 7.942 5.877 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 13.819 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: CMV-22 SCD is a Turn-Key Mod which will modify CVN ships to accommodate CMV-22 aircraft as the Carrier On-board Delivery (COD) aircraft replacing the C-2. Ship modifications have been approved via the following Ship Change Documents (SCD): 1) SCD 7233 CMV-22 Fire Wand Clips: Mounting brackets required to secure fire wand extensions with attached 15lb CO2 bottle on CVNs in the vicinity of Spot 6, Spot 9, and the fire hose station at the base of the tower aft of the island. 2) SCD 25268 CMV-22 Blade Storage: Angle arms to provide storage of V-22 spare blades. Two sets of angle arms will be installed to support bulkhead storage of 6 spare blades. CMV-22 blade storage will be in vicinity of frame 190 (Hangar Bay 3, CVN 68 Class). 3) SCD 25369 CMV-22 CVN Spaces Modifications: Current VRC C-2A (R) Detachments deployed to a CVN do not have spaces assigned, but share with the embarked E2C squadron. Due to the nature of the CONOPS, future VRM (CMV-22) Detachments deployed to CVN's will require spaces assigned to them for both the transit and operational periods of the deployment. This SCD realigns/installs infrastructure and configures spaces required to support the embarked footprint of a CMV-22 detachment as the Carrier On-board Delivery (COD) platform. These spaces include a Ready Room, Maintenance Control, and Maintenance Work Center. Installations are subject to change with ship availability schedules. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 28 of 32 P-1 Line #96 Volume 3 - 72 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 2 / CMV22 FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CMV22 B Kits Recurring 1.1.1) CMV-22 SCD - Organic Subtotal: Recurring 2 / 3.200 Subtotal: CMV22 Subtotal: Procurement, All Modification Items / 3.200 - 1 / 3.577 - / - - / - - / - - / - - / - - / - - / - - / - / 3.577 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 3.577 - / - - / - - / - - / - - / - - / - - / - - / - - 2 / 3.200 - / 3.200 - / 3.577 - / - - / - - / - - / - - / - - / - - / - - / - 2.1) Other Support - / 4.742 - / 2.300 - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Support - / 4.742 - / 2.300 - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / 0.000 - 3 / 6.777 / 6.777 - / - 3 / 6.777 / 0.000 - / 6.777 / - - / 7.042 / 0.000 - / 7.042 Support (All Modification Items) - Installation Subtotal: Installation - / - - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 4213 - Aircraft Support Equipment Navy 7.942 5.877 0.000 0.000 0.000 UNCLASSIFIED Page 29 of 32 0.000 0.000 0.000 P-1 Line #96 0.000 0.000 0.000 13.819 Volume 3 - 73 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CMV22 MDAP/MAIS Code: Modification Item 1 of 1: CMV22 LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 30 of 32 P-1 Line #96 Volume 3 - 74 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / INACTIVE PROJECTS MDAP/MAIS Code: Prior Years 525.578 525.578 525.578 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 525.578 525.578 525.578 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Inactive Projects prior year totals. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 31 of 32 P-1 Line #96 Volume 3 - 75 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4213 / Aircraft Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Modification Number / Title: 3 / INACTIVE PROJECTS FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement (*) (59) 1.1.1) INACTIVE PROJECTS - Organic Subtotal: Procurement - / 525.578 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 525.578 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 525.578 / 0.000 - / 525.578 Installation Subtotal: Installation - - / - - / - 0.000 525.578 Total Total Cost (Procurement + Support + Installation) 525.578 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Footnotes: (59) C.E. 1.1.1 Inactive Projects include NATDIS. LI 4213 - Aircraft Support Equipment Navy UNCLASSIFIED Page 32 of 32 P-1 Line #96 Volume 3 - 76 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604530N Line Item MDAP/MAIS Code: 529 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete Total 218.940 218.940 - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 218.940 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 6.552 - 1.446 - 1.446 1.117 1.212 - - - 10.327 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item funds the procurement for Advanced Arresting Gear (AAG) life cycle support modifications and upgrades required aboard Ford Class Carriers, Jet Car Track Site (JCTS) and Runway Arrested Landing Site (RALS) systems, and AAG Depot. Modifications included in the budget support fatigue life, obsolescence and performance enhancements to ensure the system remains operational throughout the life of the program. AAG replaces Mark 7 arresting gear aboard Ford Class aircraft carriers and provides the U.S. Navy with the ability to recover existing and projected aircraft carrier based tailhook equipped air vehicles well into the 21st century. AAG enhances operational capability, provides increased operational availability, reduces manning, maintenance and support costs. AAG is currently installed and deployed aboard CVN-78, installed aboard CVN-79, and installed in two land-based test sites JCTS and RALS. Prior Years ($76.9M) funded under Aircraft Support Equipment (BLI 4213 and BLI 4216). LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 1 of 21 P-1 Line #97 Volume 3 - 77 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Program Elements for Code B Items: 0204112N Other Related Program Elements: 0604512N, 0604530N Line Item MDAP/MAIS Code: 529 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Advanced Arresting Gear (AAG) (Advanced Arresting Gear (AAG)) - / 92.353 - / 2.244 - / 4.484 - / 23.551 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 92.353 - / 2.244 - / 4.484 - / 23.551 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 23.551 / 23.551 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Advanced Arresting Gear (AAG) (Advanced Arresting Gear (AAG)) - / 42.258 - / 24.145 - / 23.989 - / 2.416 - / 3.500 - / 218.940 P-40 Total Gross/Weapon System Cost - / 42.258 - / 24.145 - / 23.989 - / 2.416 - / 3.500 - / 218.940 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Baseline funding procures Support Equipment required for, and specific to, initial stand-up of AAG depot level repair capabilities for Ford Class ships. Stand-up of AAG Depot and Software Support Activity (SSA) are required to establish capability and capacity to support multiple Ford class ships by 2028. This includes AAG test fixtures, test stands and tool sets for component repair, with focus on capability for high failure components. In addition, FY 2027 Baseline funding procures support equipment required for, and specific to, AAG SSA to make minor improvements and expand capabilities of the existing AAG lab. This includes final procurement of logistics products, procurement of on-equipment tooling, test fixtures, test stands, and original equipment manufacturer (OEM) manufactured tooling to support upcoming planned overhaul periodicities. Increase from FY 2026 to FY 2027 reflects the scheduled procurement of eCASS test benches supporting Depot Standup capability, and ramp-up of procurements in support of the Jet Car Track Site (JCTS) Depot capability. The increase also supports the development and delivery of Support Equipment Recommendation Data (SERDs) and Detailed Functional Description Data Packages (DFDDPs) to support the design and procurement of test benches for high power and low power testing, troubleshooting, and fault diagnostic capability for component repair. Software Support Activity (SSA) Support Equipment is required to make minor improvements and expand capabilities of the existing AAG lab. Reliability and Obsolescence solutions will be accomplished with ECPs including but not limited to Charging Power Supply, Water Twister Drain & Fill, Rugged Servers, Half Bridges, Workstation PC-104, and UIC-600 Universal Inverter Controllers. Notes for Installation Schedule: 1. Installations are subject to change with ship availability schedule updates. 2. The year-to-year unit installations costs will vary and can exceed the projected yearly inflation rate due to the hardware installation cost being dependent on quantity and location of the ship at the time of install or which site is being update, which CVN, and the ships baseline configuration. 3. Production lead time includes pre-installation checkout, kitting with other installation hardware and drawings, and time to deliver the hardware to the installation site. Non-Recurring Engineering (NRE) funding levels will fluctuate due to mix and complexity of system ECPs being written and verified in each year. All ECPs do not require the same level of NRE. Publications and Integrated Logistics Support also vary from year to year based on complexity of logistics elements and number of publications required to be updated for each individual ECP. Integrated Logistics Support and Production Engineering Support also varies from year to year based on complexity of logistics and engineering elements required for each individual ECP. LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 2 of 21 P-1 Line #97 Volume 3 - 78 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Advanced Arresting Gear (AAG) - - - - - - - - - - - 92.353 2.244 4.484 23.551 0.000 23.551 42.258 24.145 23.989 2.416 3.500 Total 218.940 218.940 218.940 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item funds the procurement for Advanced Arresting Gear (AAG) life cycle support modifications and upgrades required aboard Ford Class Carriers, Jet Car Track Site (JCTS) and Runway Arrested Landing Site (RALS) systems. Modifications included in the budget support fatigue life, obsolescence and performance enhancements to ensure the system remains operational throughout the life of the program. AAG will replace Mark 7 arresting gear aboard Ford Class aircraft carriers and will provide the U.S. Navy with the ability to recover existing and projected aircraft carrier-based tail-hook equipped air vehicles well into the 21st century. AAG will enhance operational capability, provide increased operational availability, while reducing manning, maintenance and support costs. AAG is currently installed and deployed aboard CVN-78, installed aboard CVN-79, and installed in two land-based test sites JCTS and RALS. Outyear TBD Reliability Improvement ECPs and Obsolescence ECPs will be determined closer to year of execution to provide the program more flexibility to address competing priorities of what become the most critical obsolescence, reliability, operational, or safety upgrades. FY 2017 and prior funded under Aircraft Support Equipment (BLI 4213 and BLI 4216). LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 3 of 21 P-1 Line #97 Volume 3 - 79 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Models of Systems Affected: MK-15 Prior Years Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Related RDT&E PEs: 0604512N, 0604530N Modification Type: Advanced Arresting Gear (AAG) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement 1.1.1) Water Twister Mod II - ECP 0014 - NonOrganic Installation 1 of 15 10 / 55.484 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 55.484 / - 1 / 0.002 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.002 / - - / - - / - - / - - / - - / - 1 / 0.001 1.1.2) CSA Vent Valve - preECP 0027 - NonOrganic Installation 2 of 15 - / - - 1.1.3) AAG Maintenance Laptop - ECP 0053 - NonOrganic Installation 3 of 15 - / - 1 / 0.001 - / - - / - - / - - (*) (1) - / - - / - - / - 9 / 1.645 - / - 9 / 1.645 2 / 0.200 - / - - / - - / - - / - 11 / 1.845 1.1.5) ECP-0064 Harmonic Filter - NonOrganic Installation 4 of 15 - / - - / - - / - - / - - / - - / - 8 / 0.400 - / - - / - - / - - / - 8 / 0.400 1.1.6) ECP-0081 4u Rugged Server - NonOrganic Installation 5 of 15 - / - - / - - / - - / - - / - - / - 3 / 0.075 - / - - / - - / - - / - 3 / 0.075 1.1.7) ECP-0088 Workstation PC-104 - NonOrganic Installation 6 of 15 - / - - / - - / - - / - - / - - / - 10 / 0.700 - / - - / - - / - - / - 10 / 0.700 1.1.8) ECP-0091 3u Rugged Server - NonOrganic Installation 7 of 15 - / - - / - - / - - / - - / - - / - 3 / 0.090 - / - - / - - / - - / - 3 / 0.090 1.1.9) ECP-0087 PC-104 - NonOrganic Installation 8 of 15 - / - - / - - / - - / - - / - - / - 8 / 0.856 - / - - / - - / - - / - 8 / 0.856 1.1.10) ECP-0089 AGOCS Monitor - NonOrganic Installation 9 of 15 - / - - / - - / - - / - - / - - / - 4 / 0.200 - / - - / - - / - - / - 4 / 0.200 1.1.11) ECP-0074 PCD Encoder - NonOrganic Installation 10 of 15 - / - - / - - / - - / - - / - - / - 32 / 0.032 - / - - / - - / - - / - 32 / 0.032 1.1.12) ECP-0079 Breaking Chopper - NonOrganic Installation 11 of 15 - / - - / - - / - - / - - / - - / - 10 / 0.680 - / - - / - - / - - / - 10 / 0.680 1.1.13) ECP-0100 Half Bridge - NonOrganic Installation 12 of 15 - / - - / - - / - - / - - / - - / - 72 / 6.696 - / - - / - - / - - / - 72 / 6.696 1.1.14) FLASH Capacitor - NonOrganic Installation 13 of 15 - / - - / - - / - - / - - / - - / - 2 / 6.534 2 / 6.534 - / - - / - - / - 4 / 13.068 1.1.15) Reliability Improvement ECPs - Organic - / - - / - - / - / 1.000 - / - / 0.926 - / - - / - - 1.1.16) AAG Obsolescence ECPs - NonOrganic Installation 14 of 15 - / - - / - - / - - / - - / - - / - 3 / 1.337 - / - - / - - / - - / - 3 / 1.337 30 / 20.169 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 20.169 - / 10.580 - / - - / - - / 3.775 - / - - / 3.775 / - - / - - / 2.336 - / 0.647 / 2.668 - / - - / - - / 0.956 - / - - / 0.956 / 0.606 - / - - / 0.170 - / 0.365 / 0.002 - / 7.376 - / - - / 7.376 / 7.234 - / 3.432 - / 1.012 1.1.4) Water Twister Drain & Fill - Organic (*) (2) 1.1.17) Archived ECP Line - Organic Installation 15 of 15 1.2.1) Non-Recurring Engineering Non Organic - Organic 1.2.2) Non-Recurring Engineering Organic - Organic (*) (3) - (*) (4) Subtotal: Procurement - / 88.901 - / 0.001 - - - / 1.000 - / 0.506 - / 18.912 - - / 0.700 - - / 3.500 - - - / / 3.500 / 20.838 - - / 3.132 / 4.765 / 130.370 Support LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 4 of 21 P-1 Line #97 Volume 3 - 80 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: MK-15 Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. 2.1) Production Engineering Support 2.2) Integrated Logistics Support 2.3) Data (5) (6) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / 1.587 - / 0.251 - / 0.256 - / 0.614 - / - - / 0.614 - / 1.599 - / 0.401 - / 1.279 - / 0.301 - / - - / 6.288 - / 1.865 - / 0.230 - / 0.234 - / 0.412 - / - - / 0.412 - / 0.245 - / 0.024 - / 0.796 - / 0.506 - / - - / 4.312 - / - - / 0.757 - / 0.350 / 2.000 - / - / 4.400 - / 0.500 - / 2.982 - / 0.597 - / - - / 11.586 - / - / - - / 3.637 - / 13.149 - / - - / 13.149 - / 17.102 - / 5.771 - / 5.500 / - - / - - / 45.159 / 1.238 - / 4.477 - / 16.175 - / - - / 16.175 - / 23.346 - / 6.696 - / 67.345 (8) Subtotal: Support Related RDT&E PEs: 0604512N, 0604530N Modification Type: Advanced Arresting Gear (AAG) (7) 2.4) Support Equipment Modification Number / Title: 1 / Advanced Arresting Gear (AAG) - - / 3.452 - - - - / 2.000 - - / 10.557 - / 1.404 - / 0.000 Installation Installation 1 of 15: Water Twister Mod II - ECP 0014 - / - Installation 2 of 15: CSA Vent Valve - preECP 0027 - / - Installation 3 of 15: AAG Maintenance Laptop - ECP 0053 - / - Installation 4 of 15: ECP-0064 Harmonic Filter - / - Installation 5 of 15: ECP-0081 4u Rugged Server - / - Installation 6 of 15: ECP-0088 Workstation PC-104 - Installation 7 of 15: ECP-0091 3u Rugged Server / 1.000 - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 1.000 / 0.005 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 0.005 - / - - / - - / - - / 0.000 - / 0.005 / 0.005 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.500 - / - - / - - / 0.000 - / 0.500 - / - - / - - / - - / - - / - - / - - / 0.150 - / - - / - - / 0.000 - / 0.150 / - - / - - / - - / - - / - - / - - / - - / 0.500 - / - - / - - / 0.000 - / 0.500 - / - - / - - / - - / - - / - - / - - / - - / 0.150 - / - - / - - / 0.000 - / 0.150 Installation 8 of 15: ECP-0087 PC-104 - / - - / - - / - - / - - / - - / - - / - - / 0.800 - / - - / - - / 0.000 - / 0.800 Installation 9 of 15: ECP-0089 AGOCS Monitor - / - - / - - / - - / - - / - - / - - / - - / 0.200 - / - - / - - / 0.000 - / 0.200 Installation 10 of 15: ECP-0074 PCD Encoder - / - - / - - / - - / - - / - - / - - / - - / 0.064 - / - - / - - / 0.000 - / 0.064 Installation 11 of 15: ECP-0079 Breaking Chopper - / - - / - - / - - / - - / - - / - - / - - / 0.750 - / - - / - - / 0.000 - / 0.750 Installation 12 of 15: ECP-0100 Half Bridge - / - - / - - / - - / - - / - - / - - / - - / 0.720 - / - - / - - / 0.000 - Installation 13 of 15: FLASH Capacitor - / - - / - - / - - / - - / - - / - - / - - / 6.000 / 10.000 - / - - / 0.000 - / 0.381 - / - - / - - / 0.000 - / - - / - - / - - / 0.000 - / 10.000 - / - - / 0.000 Installation 14 of 15: AAG Obsolescence ECPs - - / - / - - / - - / - - / - - / - - / - - / - Installation 15 of 15: Archived ECP Line - / 0.223 - / - - / - - / - - / - - / - - / - Subtotal: Installation - / 0.000 / 0.005 - / - - / - - / - - / - - / 1.005 - - / 10.215 - - - - / 0.720 / 16.000 / 0.381 / 0.223 / 21.225 Total Total Cost (Procurement + Support + Installation) LI 4217 - Advanced Arresting Gear (AAG) Navy 92.353 2.244 4.484 23.551 0.000 UNCLASSIFIED Page 5 of 21 23.551 42.258 24.145 P-1 Line #97 23.989 2.416 3.500 218.940 Volume 3 - 81 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 1 of 15: Water Twister Mod II - ECP 0014 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Alteration Install Team:: Installation Name: Water Twister Mod II - ECP 0014 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 1.000 Prior Years - / - 6 / 1.000 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 6 / 1.000 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 10 / 1.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 6 - - - - - - - - - - - - - - - - - - - - - - - - 4 10 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 10 - LI 4217 - Advanced Arresting Gear (AAG) Navy 6 UNCLASSIFIED Page 6 of 21 P-1 Line #97 Volume 3 - 82 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 2 of 15: CSA Vent Valve - preECP 0027 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 1 FY 2025 FY 2026 Contract Dates Dec 2025 Delivery Dates Jan 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: CSA Vent Valve - preECP 0027 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 1 / 0.005 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.005 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 0.005 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 1 / 0.005 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 1 Out - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 1 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 7 of 21 P-1 Line #97 Volume 3 - 83 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 3 of 15: AAG Maintenance Laptop - ECP 0053 Manufacturer Information Manufacturer Name: NAWCAD Lakehurst, NJ Manufacturer Location: NAWCAD Lakehurst, NJ Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 1 Dates FY 2025 Contract Dates Nov 2024 Delivery Dates Dec 2024 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: AAG Maintenance Laptop - ECP 0053 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.005 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 / - 1 / 0.005 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 1 / 0.005 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.005 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 8 of 21 P-1 Line #97 Volume 3 - 84 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 4 of 15: ECP-0064 Harmonic Filter Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0064 Harmonic Filter Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 8 / 0.500 - / - - / - 0 / 0.000 8 / 0.500 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 8 / 0.500 - / - - / - 0 / 0.000 Installation Cost 8 / 0.500 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 8 - - - - - - - - - - - 8 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 9 of 21 - 8 P-1 Line #97 Volume 3 - 85 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 5 of 15: ECP-0081 4u Rugged Server Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2028 Delivery Dates Dec 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0081 4u Rugged Server Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 0.150 - / - - / - 0 / 0.000 3 / 0.150 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 3 / 0.150 - / - - / - 0 / 0.000 Installation Cost 3 / 0.150 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 3 - - - - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 10 of 21 - 3 P-1 Line #97 Volume 3 - 86 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 6 of 15: ECP-0088 Workstation PC-104 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0088 Workstation PC-104 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 10 / 0.500 - / - - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 10 / 0.500 - / - - / - 0 / 0.000 Installation Cost 10 / 0.500 10 / 0.500 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 10 - - - - - - - - - - - 10 Out - - - - - - - - - - - - - - - - - - - 10 - - - - - - - - - - 10 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 11 of 21 P-1 Line #97 Volume 3 - 87 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 7 of 15: ECP-0091 3u Rugged Server Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0091 3u Rugged Server Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 0.150 - / - - / - 0 / 0.000 3 / 0.150 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 3 / 0.150 - / - - / - 0 / 0.000 Installation Cost 3 / 0.150 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 3 - - - - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 12 of 21 - 3 P-1 Line #97 Volume 3 - 88 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 8 of 15: ECP-0087 PC-104 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0087 PC-104 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 8 / 0.800 - / - - / - 0 / 0.000 8 / 0.800 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 8 / 0.800 - / - - / - 0 / 0.000 Installation Cost 8 / 0.800 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 8 - - - - - - - - - - - 8 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 13 of 21 - 8 P-1 Line #97 Volume 3 - 89 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 9 of 15: ECP-0089 AGOCS Monitor Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0089 AGOCS Monitor Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 0.200 - / - - / - 0 / 0.000 4 / 0.200 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 4 / 0.200 - / - - / - 0 / 0.000 Installation Cost 4 / 0.200 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 4 - - - - - - - - - - - 4 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 14 of 21 - 4 P-1 Line #97 Volume 3 - 90 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 10 of 15: ECP-0074 PCD Encoder Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0074 PCD Encoder Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 32 / 0.064 - / - - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 32 / 0.064 - / - - / - 0 / 0.000 Installation Cost 32 / 0.064 32 / 0.064 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 32 - - - - - - - - - - - 32 Out - - - - - - - - - - - - - - - - - - - 32 - - - - - - - - - - 32 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 15 of 21 P-1 Line #97 Volume 3 - 91 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 11 of 15: ECP-0079 Breaking Chopper Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0079 Breaking Chopper Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 10 / 0.750 - / - - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 10 / 0.750 - / - - / - 0 / 0.000 Installation Cost 10 / 0.750 10 / 0.750 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 10 - - - - - - - - - - - 10 Out - - - - - - - - - - - - - - - - - - - 10 - - - - - - - - - - 10 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 16 of 21 P-1 Line #97 Volume 3 - 92 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 12 of 15: ECP-0100 Half Bridge Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2027 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: ECP-0100 Half Bridge Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 72 / 0.720 - / - - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 72 / 0.720 - / - - / - 0 / 0.000 Installation Cost 72 / 0.720 72 / 0.720 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 72 - - - - - - - - - - - 72 Out - - - - - - - - - - - - - - - - - - - 72 - - - - - - - - - - 72 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 17 of 21 P-1 Line #97 Volume 3 - 93 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 13 of 15: FLASH Capacitor Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: Tupelo, MS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Dec 2027 Dec 2028 FY 2030 Delivery Dates Dec 2028 Dec 2029 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: FLASH Capacitor Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 6.000 - / - - / - 0 / 0.000 2 / 6.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 10.000 - / - 0 / 0.000 2 / 10.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 2 / 6.000 2 / 10.000 - / - 0 / 0.000 Installation Cost 4 / 16.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 2 - - - 2 - - - - - - - 4 Out - - - - - - - - - - - - - - - - - - - - - - - - - - 4 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 18 of 21 - 2 - P-1 Line #97 2 Volume 3 - 94 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 14 of 15: AAG Obsolescence ECPs Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2028 Delivery Dates Mar 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Install Team:: Installation Name: AAG Obsolescence ECPs Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 0.381 - / - - / - 0 / 0.000 3 / 0.381 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 3 / 0.381 - / - - / - 0 / 0.000 Installation Cost 3 / 0.381 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 3 - - - - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 19 of 21 - - 3 P-1 Line #97 Volume 3 - 95 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: Installation 15 of 15: Archived ECP Line Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: Archived ECP Line Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 28 / 0.223 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 28 / 0.223 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 28 / 0.223 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 28 / 0.223 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 28 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 28 Out 28 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 28 Footnotes: (1) CE 1.1.4) Increase in funding from FY26 to FY27 reflects procurement of Water Twister Drain & Fill kits for CVN-78 & CVN-79. Water Twister maintenance procedures such as Seal Cartridge replacement and internal borescope inspection require the Water Twister to be drained and refilled. Current materials and procedures for this process are insufficient. pECP-027 will procure a comprehensive kit for use when draining and filling shipboard Water Twisters. LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 20 of 21 P-1 Line #97 Volume 3 - 96 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4217 / Advanced Arresting Gear (AAG) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Advanced Arresting Gear (AAG) MDAP/MAIS Code: (2) CE 1.1.15) AAG Reliability ECP TBD modification funding is required for retrofit ECPs implemented via Technical Directives (TDs) in production which are required to support the incorporation of established reliability improvements. (3) (4) (5) CE 1.2.1) Increase in Non-Organic NRE from FY26 to FY27 reflects required Non-Recurring Engineering in support of Obsolescence ECPs Harmonic Filter, PCD Encoder, and PC-104. CE 1.2.2) Increase in Organic NRE from FY26 to FY27 reflects required Non-Recurring Engineering in support of Obsolescence ECPs Harmonic Filter, PCD Encoder, and PC-104. CE 2.1) Increase in funds from FY26 to FY27 reflects increased Production Engineering requirement in support of Obsolescence ECPs Harmonic Filter, PCD Encoder, and PC-104, as well as Reliability improvement Water Twister Drain & Fill ECP. (6) CE 2.2) Increase in funds from FY26 to FY27 reflects increased Logistics requirement in support of Obsolescence ECPs Harmonic Filter, PCD Encoder, and PC-104, as well as Reliability improvement Water Twister Drain & Fill ECP. (7) (8) CE 2.3) Increased FY27 Data cost reflects Maintenance Laptop requirements. CE 2.4) Support Equipment increases from FY 2026 to FY 2027 reflects the scheduled procurement of eCASS test benches supporting Depot Standup capability, and ramp-up of procurements in support of the Jet Car Track Site (JCTS) Depot capability. The increase also supports the development and delivery of Support Equipment Recommendation Data (SERDs), Detailed Functional Description Data Packages (DFDDPs), and drawings to support the design and procurement of test benches for high power and low power testing, troubleshooting, and fault diagnostic capability for component repair. Required Depot support equipment includes AAG Depot test fixtures, test stands and tool sets for component repair, with focus on capability for high failure components. Procurement of eCASS test bench, shipboard tools for the Voyage Repair team are required for Depot Standup, and Depot Manual consolidation / restructuring for future organic support. SSA support equipment requires procurement of on-equipment tooling, test fixtures, test stands, and OEM manufactured tooling to support upcoming planned overhaul periodicities. LI 4217 - Advanced Arresting Gear (AAG) Navy UNCLASSIFIED Page 21 of 21 P-1 Line #97 Volume 3 - 97 === page 174 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 98 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Program Elements for Code B Items: N/A Other Related Program Elements: 0604112N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 0.499 Continuing Total 210.545 210.545 210.545 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - 1.447 1.528 0.223 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Electromagnetic Aircraft Launch System (EMALS) is replacing the C13 Steam Catapult System aboard Ford Class carriers and is an advanced technology aircraft launch system which provides improved reliability and maintainability, reduced manning workload and increased operational availability. This budget line-item funds the procurement for Electromagnetic Aircraft Launch System (EMALS) life cycle support modifications and upgrades required aboard Ford Class carriers and System Functional Demonstration (SFD) land-based test site. Modifications included in the budget support fatigue life, obsolescence and performance enhancements to ensure the system remains operational throughout the life of the program. EMALS replaces the C13 Steam Catapult System aboard Ford Class carriers and is an advanced technology aircraft launch system which provides improved reliability and maintainability, reduced manning workload and increased operational availability. EMALS is installed aboard CVN-78, CVN-79, and in one land-based test site at SFD. EMALS prior years ($39.910M) was previously funded under Aircraft Support Equipment (BLI 4213 and 4216). LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 1 of 20 P-1 Line #98 Volume 3 - 99 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Program Elements for Code B Items: N/A Other Related Program Elements: 0604112N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Electromagnetic Aircraft Launch System (EMALS) (TBD) - / 36.064 - / 14.702 - / 16.294 - / 36.908 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 36.064 - / 14.702 - / 16.294 - / 36.908 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 36.908 / 36.908 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Electromagnetic Aircraft Launch System (EMALS) (TBD) - / 27.227 - / 20.706 - / 21.144 - / 22.430 - / 15.070 - / 210.545 P-40 Total Gross/Weapon System Cost - / 27.227 - / 20.706 - / 21.144 - / 22.430 - / 15.070 - / 210.545 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Baseline funding is required for Depot Standup and modifications based on obsolescence. Work categories include Production Engineering (PE), Integrated Logistics Support (ILS), and Non-Recurring Engineering (NRE). Depot Standup Support Equipment is to procure equipment required for initial standup of EMALS depot level repair capabilities for Ford Class ships. This includes final procurement of logistics products, procurement of on-equipment tooling, test fixtures, test stands, and OEM manufactured tooling to support upcoming planned overhaul periodicities. Increase from FY 2026 to FY 2027 supports the development and delivery of Support Equipment Recommendation Data (SERDs) and Detailed Functional Description Data Packages (DFDDPs) to support the design and procurement of test benches for high power and low power testing, troubleshooting, and fault diagnostic capability for component repair. Software Support Activity (SSA) Support Equipment is required to make minor improvements and expand capabilities of the existing EMALS lab. Standup of EMALS Depot and SSA are required to establish the capability and capacity to support four Ford Class ships by 2028. Modifications to fielded ships are required in order to retrofit obsolescence solutions identified in New Construction efforts and ensure support for all Ford Class ships. This involves any NRE to adapt the New Construction solution to existing hulls, kits, and installations. These efforts include, but are not limited to, EMALS Rectifier Temperature Transmitter Obsolescence (ECP-I-EMALS-0075). Other EMALS Obsolescence Modifications funding is required to incorporate changes based on emergent obsolescence/tech refresh within EMALS. Funds may address ECPs due to Technical Directives (TDs) which are required to support the incorporation of established capability, reliability, maintainability, obsolescence, safety, and supportability improvements. Notes for Installation Schedule: 1. Installations are subject to change with ship availability schedule updates. 2. The year-to-year unit installations costs will vary and can exceed the projected yearly inflation rate due to the hardware installation cost being dependent on quantity and location of the ship at the time of install or which site is being updated, which CVN, and the ships baseline configuration. 3. Production lead time includes pre-installation checkout, kitting with other installation hardware and drawings, and time to deliver the hardware to the installation site. Non-Recurring Engineering (NRE) funding levels fluctuate due to a mix and complexity of system Engineering Change Proposals (ECP) written and verified in each year. All ECPs do not require the same level of NRE. LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 2 of 20 P-1 Line #98 Volume 3 - 100 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Program Elements for Code B Items: N/A Other Related Program Elements: 0604112N Line Item MDAP/MAIS Code: N/A Integrated Logistics Support also varies from year to year based on complexity of logistics elements required for each individual ECP. LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 3 of 20 P-1 Line #98 Volume 3 - 101 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 - - - - - - - - - - - 36.064 14.702 16.294 36.908 0.000 36.908 27.227 20.706 21.144 22.430 15.070 Total 210.545 210.545 210.545 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line-item funds the procurement for Electromagnetic Aircraft Launch System (EMALS) life cycle support modifications and upgrades required aboard Ford Class carriers and System Functional Demonstration (SFD) land-based test site. Modifications included in the budget support fatigue life, obsolescence and performance enhancements to ensure the system remains operational throughout the life of the program. EMALS replaces the C13 Steam Catapult System aboard Ford Class carriers and is an advanced technology aircraft launch system which provides improved reliability and maintainability, reduced manning workload and increased operational availability. EMALS is installed aboard CVN-78, CVN-79, and in one land-based test site at SFD. EMALS ECP upgrades include four (4) major categories of upgrades: (1) Obsolescence: provides funding for ECPs used to address critical or obsolete parts in any of the major or subcomponent systems and emergent obsolescence/tech refresh within EMALS. (2) Reliability Improvements/Upgrades: provides funding for ECPs to address any issues that support reliability of EMALS system at SFD and onboard Ford Class ships. (3) Operational Capability Improvements: provides funding for ECPs that specifically address operational capability improvements, which are mostly driven by changes as a result of findings during Correction of Deficiency testing. (4) Safety of Operations/Flight: provides funding for ECPs that directly affect safety of flight operations that might limit flight operations during normal optempo. Additionally, this budget includes ECPs for items such as software upgrades to components or subsystem components that cause issues under normal operating conditions of EMALS will be included in each of the four categories when software updates are required. Funding is also used to support directed cyber mandates to ensure compliance of cyber issues in EMALS operating system. Planned EMALS ECPs are subject to change in the year of execution due to urgent and compelling fleet requirements in support of Ford Class carrier operational commitments. Outyear ECPs will be determined closer to year of execution to provide the program more flexibility to address competing priorities of what becomes the most critical obsolescence, reliability, operational, or safety upgrades. LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 4 of 20 P-1 Line #98 Volume 3 - 102 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement 1.1.1) T/R Fuse Detection - ECP 0025 - NonOrganic Installation 1 of 13 2 / 2.425 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.425 1.1.2) Motor Controller - ECP 0015 - NonOrganic Installation 2 of 13 - 1 / 0.148 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.148 1.2.1) Non-Recurring Engineering - E22 Builds - NonOrganic (*) / - - / 9.570 - / 1.361 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.931 - / 9.741 - / 0.621 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.362 Organic 1.2.2) Non-Recurring Engineering - E22 Build Organic (*) Organic 2.1.1) BSC CPLD - ECP 0066 - NonOrganic Installation 3 of 13 - / - - / - - / - - / - - / - - / - 1 / 0.500 2 / 1.020 - / - - / - - / - 3 / 1.520 2.1.2) Electrical Isolation - ECP 0104 - NonOrganic Installation 4 of 13 - / - - / - - / - - / - - / - - / - 1 / 3.250 1 / 3.315 - / - - / - 1 / 3.812 3 / 10.377 2.1.3) EMALS Rectifier Temperature Transmitter Obsolescence ECP 0075 - NonOrganic Installation 5 of 13 - / - - / - - / - - / - - / - - / - 1 / 0.250 2 / 0.525 - / - - / - - / - 3 / 0.775 2.1.4) AUTOSUSPENDS - ECP TBD - NonOrganic Installation 6 of 13 - / - - / - - / - - / - - / - - / - - / - 2 / 0.400 1 / 0.200 - / - - / - 3 / 0.600 2.1.5) EMALS Server & PC-104 Obsolescence - NonOrganic Installation 7 of 13 - / - - / - - / - - / - - / - - / - - / - 2 / 1.500 1 / 0.750 - / - - / - 3 / 2.250 2.1.6) EMALS Obsolescence - ECP TBD 1 - NonOrganic Installation 8 of 13 - / - - / - - / - - / - - / - - / - - / - 3 / 0.750 - / - - / - - / - 3 / 0.750 2.1.7) EMALS Obsolescence - ECP TBD 2 - NonOrganic Installation 9 of 13 - / - - / - - / - - / - - / - - / - - / - 3 / 0.900 - / - - / - - / - 3 / 0.900 2.1.8) EMALS Obsolescence - ECP TBD 3 - NonOrganic Installation 10 of 13 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.750 1 / 0.383 - / - 3 / 1.133 2.1.9) EMALS Obsolescence - ECP TBD 4 - NonOrganic Installation 11 of 13 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.200 - / - 3 / 1.200 2.1.10) EMALS Obsolescence - ECP TBD 5 - NonOrganic Installation 12 of 13 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.750 1 / 0.383 3 / 1.133 2.1.11) EMALS Obsolescence - ECP TBD 6 - NonOrganic Installation 13 of 13 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.400 1 / 0.200 3 / 0.600 2.1.12) Other EMALS Obsolescence Modifications - - / - - / - - / - - / - - / - - / - NonOrganic (*) (1) 2.2.1) Non-Recurring Engineering - NonOrganic - NonOrganic (*) - / 0.260 - / 0.361 - / - - / 0.361 - / 0.948 - / 0.593 - / 1.249 - / 5.427 - / - - / - - / 0.975 - / - - / 0.975 - / 4.203 - / 1.722 - / 3.695 - / 4.708 - / - - / - - / 0.500 - / - - / 0.500 - / 1.425 - / 1.018 - / 1.918 - / 2.897 - / - - / 8.838 / 15.303 (2) (*) (3) 2.2.2) Non-Recurring Engineering - Organic - NonOrganic LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 5 of 20 P-1 Line #98 - / 7.758 Volume 3 - 103 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. 2.2.3) Software Upgrades - Organic - Organic FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / - - / - / 21.736 - / 2.130 - / 0.260 - / 1.836 - / - - / 1.836 - / 2.497 - / 1.199 - / 1.223 - / 1.171 - / - - / 1.171 - / 1.521 - / 1.373 - / 0.586 - / 0.598 - / 0.612 - / - - / 0.612 - / 0.894 (*) Subtotal: Procurement Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) - / - - / - - / - - - / - - / - / 10.576 - - / 0.911 - / 0.964 / 12.654 - / 9.526 - / 2.948 - / 3.159 - / 2.734 - / 3.037 - - / 1.192 - / - - / 3.067 / 16.957 - / 4.395 - / 80.070 - / 2.040 - / 3.236 - / 18.994 - / 2.355 - / 3.129 - / 15.318 / - - - Support 3.1) Production Engineering Support 3.2) Integrated Logistics Support 3.3) Support Equipment (4) (5) (6) Subtotal: Support - / 10.458 - / 10.712 - / 13.872 - / 33.289 - / - - / 33.289 - / 14.236 - / 14.328 - / 12.497 - / 15.693 - / 35.072 - / - - / 35.072 - / 16.651 - / / 5.682 - - / / 6.196 - - / - - / 4.395 - / 6.365 / 82.567 / 116.879 - Installation Installation 1 of 13: T/R Fuse Detection - ECP 0025 - / - Installation 2 of 13: Motor Controller - ECP 0015 - / - Installation 3 of 13: BSC CPLD - ECP 0066 - / - Installation 4 of 13: Electrical Isolation - ECP 0104 - Installation 5 of 13: EMALS Rectifier Temperature Transmitter Obsolescence - ECP 0075 / 0.341 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 0.341 / 0.075 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 0.075 - / - - / - - / - - / - - / - - / - - / 0.400 - / 0.816 - / - - / 0.000 - / 1.216 / - - / - - / - - / - - / - - / - - / - - / 1.470 - / 1.499 - / - - / 1.724 - / 4.693 - / - - / - - / - - / - - / - - / - - / - - / 0.500 - / 0.525 - / - - / 0.000 - / 1.025 Installation 6 of 13: AUTOSUSPENDS - ECP TBD - / - - / - - / - - / - - / - - / - - / - - / - - / 0.600 - / 0.300 - / 0.000 - / 0.900 Installation 7 of 13: EMALS Server & PC-104 Obsolescence - / - - / - - / - - / - - / - - / - - / - - / - - / 0.332 - / 0.166 - / 0.000 - / 0.498 Installation 8 of 13: EMALS Obsolescence - ECP TBD 1 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.750 - / - - / 0.000 - / 0.750 Installation 9 of 13: EMALS Obsolescence - ECP TBD 2 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.900 - / - - / 0.000 - / 0.900 Installation 10 of 13: EMALS Obsolescence - ECP TBD 3 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.612 - / 0.312 - / 0.924 Installation 11 of 13: EMALS Obsolescence - ECP TBD 4 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.600 - / 0.600 Installation 12 of 13: EMALS Obsolescence - ECP TBD 5 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.924 - / 0.924 Installation 13 of 13: EMALS Obsolescence - ECP TBD 6 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.750 - / 0.341 - / - - / - - / - - / - / 1.078 - / 4.310 Subtotal: Installation - / 0.000 - - / - / 0.075 - - - / 2.370 - / 5.422 - - - / 0.750 / 13.596 Total Total Cost (Procurement + Support + Installation) 36.064 LI 4219 - Electromagnetic Aircraft Launch System (... Navy 14.702 16.294 36.908 0.000 UNCLASSIFIED Page 6 of 20 36.908 27.227 20.706 P-1 Line #98 21.144 22.430 15.070 210.545 Volume 3 - 104 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 1 of 13: T/R Fuse Detection - ECP 0025 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 11 Dates Production Leadtime (in Months): 20 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: T/R Fuse Detection - ECP 0025 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - 2 / 0.341 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.341 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 2 / 0.341 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 2 / 0.341 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 2 - - - - - - - - - - - - - - - - - - - - - - 2 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - 2 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 7 of 20 P-1 Line #98 Volume 3 - 105 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 2 of 13: Motor Controller - ECP 0015 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 6 Dates FY 2025 Contract Dates Dec 2024 Delivery Dates Jun 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Motor Controller - ECP 0015 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.075 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 / - 1 / 0.075 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 1 / 0.075 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.075 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 8 of 20 P-1 Line #98 Volume 3 - 106 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 3 of 13: BSC CPLD - ECP 0066 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Mar 2028 Mar 2029 Delivery Dates Mar 2029 Mar 2030 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: BSC CPLD - ECP 0066 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.400 - / - - / - 0 / 0.000 1 / 0.400 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.816 - / - 0 / 0.000 2 / 0.816 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 1 / 0.400 2 / 0.816 - / - 0 / 0.000 Installation Cost 3 / 1.216 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - - 2 - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 9 of 20 - 1 - P-1 Line #98 - 2 Volume 3 - 107 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 4 of 13: Electrical Isolation - ECP 0104 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 9 Dates Production Leadtime (in Months): 8 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jun 2028 Mar 2029 FY 2030 Delivery Dates Feb 2029 Nov 2029 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: Electrical Isolation - ECP 0104 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 1.470 - / - - / - 0 / 0.000 1 / 1.470 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.499 - / - 0 / 0.000 1 / 1.499 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.724 1 / 1.724 Total - / - - / - - / - - / - - / - - / - - / - 1 / 1.470 1 / 1.499 - / - 1 / 1.724 3 / 4.693 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - 1 - - - - - - - 1 3 Out - - - - - - - - - - - - - - - - - - - - - - - 1 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 10 of 20 - - 1 - - P-1 Line #98 1 Volume 3 - 108 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 5 of 13: EMALS Rectifier Temperature Transmitter Obsolescence - ECP 0075 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Dec 2027 Dec 2028 FY 2030 Delivery Dates Dec 2028 Dec 2029 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Rectifier Temperature Transmitter Obsolescen Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.500 - / - - / - 0 / 0.000 1 / 0.500 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.525 - / - 0 / 0.000 2 / 0.525 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 1 / 0.500 2 / 0.525 - / - 0 / 0.000 Installation Cost 3 / 1.025 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 1 - - - 2 - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 11 of 20 - 1 - 2 P-1 Line #98 Volume 3 - 109 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 6 of 13: AUTOSUSPENDS - ECP TBD Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2029 FY 2030 Contract Dates FY 2028 Dec 2028 Dec 2029 FY 2031 Delivery Dates Dec 2029 Dec 2030 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: AUTOSUSPENDS - ECP TBD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.600 - / - 0 / 0.000 2 / 0.600 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.300 0 / 0.000 1 / 0.300 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.600 Installation Cost 1 / 0.300 0 / 0.000 3 / 0.900 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - 1 - 1 - 1 - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - 1 - 1 - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 12 of 20 - P-1 Line #98 1 Volume 3 - 110 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 7 of 13: EMALS Server & PC-104 Obsolescence Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2029 FY 2030 Contract Dates FY 2028 Jan 2029 Jan 2030 FY 2031 Delivery Dates Jan 2030 Jan 2031 Installation Information Method of Implementation: Alteration Installation:: Installation Name: EMALS Server & PC-104 Obsolescence Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.332 - / - 0 / 0.000 2 / 0.332 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.166 0 / 0.000 1 / 0.166 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.332 Installation Cost 1 / 0.166 0 / 0.000 3 / 0.498 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - 2 - - - 1 - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - 1 - - 1 - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 13 of 20 P-1 Line #98 1 Volume 3 - 111 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 8 of 13: EMALS Obsolescence - ECP TBD 1 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2028 Delivery Dates Dec 2029 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 1 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.750 - / - 0 / 0.000 3 / 0.750 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.750 - / - 0 / 0.000 Installation Cost 3 / 0.750 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - 3 - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - 3 - - - - - - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 14 of 20 P-1 Line #98 Volume 3 - 112 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 9 of 13: EMALS Obsolescence - ECP TBD 2 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2028 Delivery Dates Dec 2029 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 2 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.900 - / - 0 / 0.000 3 / 0.900 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.900 - / - 0 / 0.000 Installation Cost 3 / 0.900 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - 3 - - - - - - - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 15 of 20 - 3 P-1 Line #98 Volume 3 - 113 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 10 of 13: EMALS Obsolescence - ECP TBD 3 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2030 FY 2031 Contract Dates FY 2028 FY 2029 Dec 2029 Dec 2030 Delivery Dates Dec 2030 Dec 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 3 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.612 0 / 0.000 2 / 0.612 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.312 1 / 0.312 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.612 Installation Cost / - - 1 / 0.312 / - 3 / 0.924 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - 1 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - 1 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 16 of 20 P-1 Line #98 Volume 3 - 114 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 11 of 13: EMALS Obsolescence - ECP TBD 4 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2030 Delivery Dates Nov 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 4 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.600 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.600 Installation Cost 3 / 0.600 / - - / - 3 / 0.600 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 17 of 20 P-1 Line #98 Volume 3 - 115 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 12 of 13: EMALS Obsolescence - ECP TBD 5 Manufacturer Information Manufacturer Name: General Atomics Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2030 Delivery Dates Dec 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 5 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.612 2 / 0.612 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.312 1 / 0.312 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.924 3 / 0.924 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 18 of 20 P-1 Line #98 Volume 3 - 116 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: Installation 13 of 13: EMALS Obsolescence - ECP TBD 6 Manufacturer Information Manufacturer Name: KATO ENGINEERING Manufacturer Location: MN Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2030 Delivery Dates Dec 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: EMALS Obsolescence - ECP TBD 6 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.500 2 / 0.500 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.250 1 / 0.250 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.750 3 / 0.750 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 Footnotes: (1) Other EMALS Obsolescence Modifications funding is required to incorporate changes based on emergent obsolescence/tech refresh within EMALS. Funds may address ECPs due to Technical Directives (TDs) which are required to support the incorporation of established capability, reliability, maintainability, obsolescence, safety and supportability improvements. LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 19 of 20 P-1 Line #98 Volume 3 - 117 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4219 / Electromagnetic Aircraft Launch System (EMALS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Electromagnetic Aircraft Launch System (EMALS) MDAP/MAIS Code: (2) Non-Recurring Engineering NonOrganic: FY 2027 NRE required to support obsolescence ECP efforts to include, but not limited to, EMALS Rectifier Temperature Transmitter Obsolescence (ECP-IEMALS-0075). (3) (4) (5) (6) Non-Recurring Engineering Organic: FY 2027 NRE required to support obsolescence ECP efforts to include, but not limited to, EMALS Rectifier Temperature Transmitter Obsolescence (ECP-I-EMALS-0075). Production Engineering support: FY 2027 PE required to support obsolescence ECP efforts and Support Equipment procurements for Depot Standup. Integrated Logistics Support: FY 2027 ILS required to support obsolescence ECP efforts and Support Equipment procurements for Depot Standup. Support Equipment: Increase from FY 2026 to FY 2027 is driven by the addition of Operational Test Program Set (OTPS) Development, Electronic Consolidated Supported System (ECASS) Bench Procurement, Units Under Test (UUT) for OTPS Development, additional EMALS system specific Support Equipment Recommendation Data (SERDs) and Detailed Functional Description Data Packages (DFDDPs), and Software Support Activity (SSA) Support Equipment required to make minor improvements and expand capabilities of the existing EMALS lab, not previously budgeted for. LI 4219 - Electromagnetic Aircraft Launch System (... Navy UNCLASSIFIED Page 20 of 20 P-1 Line #98 Volume 3 - 118 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4226 / Meteorological Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 271.733 271.733 271.733 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 17.982 13.806 7.477 0.000 7.477 12.737 14.225 14.526 - - - - - - - - 17.982 13.806 7.477 0.000 7.477 12.737 14.225 14.526 To FY 2031 Complete - Total - 14.859 Continuing - Continuing - 14.859 Continuing - Continuing - - - - - - - - - - 17.982 13.806 7.477 0.000 7.477 12.737 14.225 14.526 14.859 Continuing Continuing 14.878 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.146 0.413 4.126 - 4.126 4.649 0.381 16.013 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Meteorological Equipment budget line item provides new and replacement meteorological equipment for Navy and Marine Corps Air Stations, Navy ships, Marine Corps Operational Force units and other activities required to provide weather observations and provide safety of flight capabilities. It also provides new Intelligence Preparation of the Operational Environment (IPOE) equipment for submarines. The Meteorological Equipment procurement has been coordinated with other Department of War (DoW) and civilian agencies. [P40A / SP051 Satellite Receiver Upgrades (Space)]: Environmental Satellite Receiver Processor Systems (ESRP Ashore and ESRP Afloat) receive and process remotely sensed data in L and S frequency bands from several National and International Meteorology and Oceanography (METOC) Satellite families such as the Defense Meteorological Satellite Program (DMSP) Polar Satellites, the National Oceanic and Atmospheric Administration (NOAA) Satellites, and the Geostationary Operational Environmental Satellite (GOES-R) Series. Integration of next generation polar and geostationary orbiting satellite families and new sensors of opportunity shall be incorporated in the hardware design and software upgrades to existing Environmental Satellite Receiver Processor Systems both afloat and ashore. The modernization of systems includes GOES-R, Electro-Optical/Infrared Weather Systems - Geostationary (EWS-G), and Weather System Follow-On Microwave (WSF-M) ingest of METOC data, as well as the addition of X and C frequency bands for current and future capabilities. [P40A / SP550 METOC SASC Upgrades]: Procures Government Off-The-Shelf/Commercial Off-The-Shelf hardware and associated software upgrades for the 69 fielded Automated Surface Observing Systems (ASOS) and the 9 fielded Supplemental Weather Radars (SWR). Both atmospheric sensing systems are essential for aviation safety, Naval Aviation operations, and resource protection. ASOS procurements under this project will provide system upgrades as required by the 2025 National Weather Service Interagency Agreement. SWR upgrades of End of Life components, software, and subsystems under this project provide System Life Extension by mitigating CYBER risk and Diminishing Manufacturing Sources and Material Shortages (DMSMS). [P40A / SP600 Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV)]: Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV) procures ocean sensor systems. The vehicles are a highly persistent oceanographic sensing/data collection capability (buoyancy driven Gliders that sense ocean volume parameters such as conductivity, temperature, depth, optical clarity, currents, etc.) in support of CNOs and Fleet Intelligence Preparation of the Operational Environment (IPOE), Undersea Warfare (USW), Antisubmarine Warfare (ASW), Mine Warfare (MIW), Naval Special Warfare (NSW), Subsea and Seabed Warfare (SSW) and Naval Expeditionary operations. The Gliders are controlled remotely and maintained from the Naval Oceanographic Office (NAVOCEANO), Stennis Space Center, Mississippi from the Glider Operations Center (GOC). Quantities represent the fleet goals of 50 gliders operational, or at-the-ready, out of a population of 150, with follow-on Gliders to continue an annual acquisition of 15 Gliders/yr. Recommended lifespan of 5 years has been extended 2xs over, through following the ongoing required manufacturer recommended maintenance (repairs, calibrations, and parts obsolescence) and RDT&E efforts managed by the PEO. These efforts systematically improved the Gliders with longer endurance and capabilities, crucial in reaching and maintaining the Fleets goal of 150 Gliders, while also continuously improving Glider components. This leads to minimized system loss, improved battery management and diminished sensor failures. LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 1 of 7 P-1 Line #99 Volume 3 - 119 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4226 / Meteorological Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / SP660 Tactical METOC Applications]: The Naval Integrated METOC Systems (NIMS), formerly Meteorological Mobile Facility Next Generation (MetMF - NextGen), provides meteorological and oceanographic (METOC) support to the Marine Corps and Joint forces. The primary functions of the systems are to collect, process and exploit, interpret, produce, and disseminate METOC data. Those functions are carried out through 5 integrated subsystems; Doppler Radar, Local & Remote Sensors, Meteorological Satellite, Upper Air Sensor, and Processing Computer Subsystem (PCS), which includes a Forecaster Tool Kit (FTK) that collects, processes, and transmits METOC data. In 2023, the Naval Integrated Tactical Environmental System - Next Generation (NITES - Next) hardware component, NITES IV, moved to the MetMF Program. This move places Navy and Marine Corps hardware under one Program and expands the Warfare mission areas to include all aspects of the Marine Air Ground Task Force (MAGTF), Undersea Warfare (USW), Anti-Submarine Warfare (ASW), Mine Warfare (MIW), Amphibious Warfare (AMW), Anti-Surface Warfare (ASUW), Anti-Air Warfare (AAW), Strike Warfare (STW), Expeditionary Warfare (EXW), Electronic Warfare (EW), Information Operations (IO), Intelligence Operations (INT), Non-Combat Operations (NCO), Command, Control, Communication (CCC), and Naval Special Warfare (NSW). The Program supports those missions by utilizing real time battlespace observed meteorological parameters; automatically displays, generates, and disseminates customized products; provides in-situ data through an onboard Mesoscale "NOWCAST" Modeling capability; provides Tactical Decision Aids (TDA's) for targeting, Electronic Counter Measures (ECM), and Electronic Counter-Counter Measures (ECCM) performance; provides decision makers with information that impacts mission effectiveness and weapon system performance; and operates on DoW NIPR, SIPRNET, ship and tactical networks. TDA's consist of a series of analysis tools which characterize the physical environmental conditions of the battlespace based on the best set of physical environmental data available at the time (i.e., some combination of historical and/or real-time (or near real-time) in-situ, and numerically modeled forecast data). This program addresses multi-warfare areas across Navy and Marine Corps mission requirements, particularly shallow water ASW, NSW, and USMC MAGTF. Beginning in FY 2023, the NITES-Next Program was absorbed into the Naval Integrated METOC Systems (NIMS) Program (formerly Meteorological Mobile Facility Next Generation (MetMF - NextGen). NIMS will be a more scalable configuration and absorbs the NITES program hardware requirement - laptops, servers and atmospheric surface sensors. The NIMS program satisfies Fleet Marine Force and Joint Force Meteorology and Oceanography (METOC) employment requirements via a system of organic atmospheric sensing sub-systems through the delivery of timely, accurate and relevant METOC products and mission impact assessments. [P40A / SP220 Hazardous Weather Detection and Display Capability (HWDDC)]: The Hazardous Weather Detection and Display Capability (HWDDC) provides near real-time severe weather information (thunderstorms, high winds, turbulence, etc.) to ship, Strike Group, and Amphibious Readiness Group personnel. HWDDC is a critical safety of aviation and navigation enabler. HWDDC also supports efficient planning and execution of aircraft and small boat launch/recovery operations, as well as severe weather sensitive evolutions such as underway replenishments. The HWDDC technology is integrated with the AN/ SPS-48E and AN/SPS-48G radars. HWDDC is currently installed on all Force Level ships (except CVN-78) with Fleet requirements for AN/SPY 6 Enterprise Air Surveillance Radar (EASR) hardware End of Life component upgrades, and associated software upgrades to enhance capabilities and prevent cyber vulnerabilities in the Fleet. LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 2 of 7 P-1 Line #99 Volume 3 - 120 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4226 / Meteorological Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Meteorological Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 271.733 - / 17.982 - / 13.806 - / 7.477 - / 271.733 - / 17.982 - / 13.806 - / 7.477 - / - - / 7.477 / 0.000 - / 7.477 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget will procure the following: (SP550) Meteorological and Oceanographic Surface-based Atmospheric Sensing Capability (METOC SASC) Upgrades - (9) Automated Surface Observing System (ASOS) Upgrades - (10) Supplemental Weather Radar (SWR) Upgrades (SP600) Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV) - (7) LBS Gliders (LBS-G) - (7) LBS-UUV Upgrades/Backfits (SP660) Tactical METOC Applications - (10) The Naval Integrated METOC Systems (NIMS) Sensors (formerly Meteorological Mobile Facility Next Generation (MetMF - NextGen)) (SP220) Hazardous Weather Detection and Display Capability (HWDDC) - (2) HWDDC EASR (SW v4.0) LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 3 of 7 P-1 Line #99 Volume 3 - 121 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 4226 / Meteorological Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Meteorological Equipment Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) SP051 Satellite Receiver Upgrades (Space) 1.1) ESRP AFLOAT Modernized System (†) 1.2) ESRP Afloat Engineering Change Order A A Subtotal: 1) SP051 Satellite Receiver Upgrades (Space) 1,057.400 5 5.287 1,078.500 4 4.314 1,100.333 2 2.201 - - - - - - - - - - - - - - - - - 1.133 - - - - - - - - - - - 5.287 - - 4.314 - - 3.334 - - - - - - - - - 70.383 512 36.036 207.867 15 3.118 216.538 13 2.815 218.778 9 1.969 - - - 218.778 9 1.969 89.282 170 15.178 157.222 9 1.415 163.886 9 1.475 164.818 10 1.648 - - - 164.818 10 1.648 - - 51.214 - 3.617 - - - - 3.617 2) SP550 METOC SASC Upgrades 2.1) Automated Surface Observing System (ASOS) A (1)(†) Upgrades 2.2) Supplemental Weather Radar (SWR) Upgrades A (2)(†) Subtotal: 2) SP550 METOC SASC Upgrades - - 4.533 - - 4.290 - - 3) SP600 Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV) 3.1) LBS-Gliders (LBS-G) (3)(†) 3.2) LBS-UUV Upgrades/Backfits A A (4)(†) Subtotal: 3) SP600 Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV) 454.438 112 50.897 245.867 15 3.688 250.800 12 3.010 256.714 7 1.797 - - - 256.714 7 1.797 160.652 46 7.390 72.909 11 0.802 74.114 10 0.741 75.143 7 0.526 - - - 75.143 7 0.526 - - 58.287 - - 4.490 - - 3.751 - - 2.323 - - - - - 2.323 3.171 328 1.040 - - - - - - - - - - - - - - - - - 0.922 26.081 37 0.965 28.150 11 0.310 29.000 10 0.290 - - - 29.000 10 0.290 - - 1.962 - - 0.965 - - 0.310 - - 0.290 - - - - - 0.290 0.733 - - - 0.733 - - - 4) SP660 Tactical METOC Applications 4.1) Naval Integrated METOC Systems(NIMS) Laptops A 4.2) Naval Integrated METOC Systems(NIMS) A Sensors (5)(†) Subtotal: 4) SP660 Tactical METOC Applications 5) SP220 Hazardous Weather Detection and Display Capability (HWDDC) 5.1) HWDDC EASR (†) A (SW v4.0) Subtotal: 5) SP220 Hazardous Weather Detection and Display Capability (HWDDC) 342.200 - LI 4226 - Meteorological Equipment Navy 5 - 1.711 1.711 351.000 - 2 - 0.702 0.702 358.000 - 2 - 0.716 0.716 UNCLASSIFIED Page 4 of 7 366.730 - 2 - P-1 Line #99 366.730 - 2 - 0.733 0.733 Volume 3 - 122 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 4226 / Meteorological Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Meteorological Equipment FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 6) SP555 Production Support 6.1) Satellite Receiver Upgrades (Prod Support) A 6.2) LBS-UUV (Prod Support) A - - 1.635 - - 0.259 - - 0.184 - - - - - - - - - - - - - - 0.256 - - 0.167 - - 0.086 - - - - - 0.086 - - 1.635 - - 0.515 - - 0.351 - - 0.086 - - - - - 0.086 - - 11.155 - - 2.148 - - 0.725 - - - - - - - - - - - 0.613 - - 0.154 - - 0.165 - - 0.212 - - - - - 0.212 - - 11.768 - - 2.302 - - 0.890 - - 0.212 - - - - - 0.212 - - 0.898 - - 0.161 - - 0.164 - - 0.216 - - - - - 0.216 - - 0.898 - - 0.161 - - 0.164 - - 0.216 - - - - - 0.216 84.894 1,637 138.971 - - - - - - - - - - - - - - - Subtotal: 9) Consolidated Prior Year Requirements - - 138.971 - - - - - - - - - - - - - - - Total - - 271.733 - - 17.982 - - 13.806 - - 7.477 - - - - - 7.477 Subtotal: 6) SP555 Production Support 7) SP777 FMP 7.1) Satellite Receiver Upgrades (Install) A 7.2) HWDDC (Install) A (6) Subtotal: 7) SP777 FMP 8) DSA 8.1) HWDDC (DSA) A Subtotal: 8) DSA 9) Consolidated Prior Year Requirements 9.1) Consolidated Prior Year Requirements A (7) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) Automated Surface Observing System (ASOS) Upgrades - FY 2027 decrease is due to the procurement of (4) fewer systems Supplemental Weather Radar (SWR) Upgrades - FY 2027 increase is due to the procurement of (1) additional system. LBS-Gliders (LBS-G) - FY 2027 decrease is due to the procurement of (5) fewer systems. LBS-Upgrades/Backfits (LBS-U/B) - FY 2027 decrease is due to the procurement of (3) fewer systems. Naval Integrated METOC Systems (NIMS) Sensors (formerly Meteorological Mobile Facility Next Generation (MetMF - NextGen) - FY 2027 decrease is due to the procurement of (1) fewer system. FY 2027 unit cost increase is due to the procurement of (1) less system resulting in a loss of quantity discount. (6) (7) HWDDC Install - FY 2027 installation unit cost increase is due to heightened requirements for increased integration and testing complexities and rising costs of the specialized labor needed to successfully deploy critical capabilities. Consolidated Prior Year Requirements: Programs included in this Cost Element include: TESS/NITES (Mobile Tactical System and Hardware Components, METMF(R) NEXGEN/Subsystems, METOC Satellite Data Exploitation Readiness (FNMOC Upgrades and NAVOCEANO Upgrades), Hazardous Weather Detection & Display Capability (HWDDC)SPS-48E/G Variant, Littoral Battlespace Sensing - Autonomous Undersea Vehicles (LBS-AUV), Littoral Battlespace Sensing (LBS-AUV) Shipset and Satellite Receiver Upgrades (Space) (FNMOC Upgrades and NAVOCEANO Upgrades), LBS-AUV(S)/Razorback, Environmental Satellite Receiver Processor (ESRP) afloat/ashore satellite receiver/pedestal upgrades. LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 5 of 7 P-1 Line #99 Volume 3 - 123 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 4226 / Meteorological Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC] O O C FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Meteorological Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 1) SP051 Satellite Receiver Upgrades (Space) 1.1) ESRP AFLOAT Modernized System 2025 V2X / Indianapolis SS / CPFF NAVWAR Feb 2025 Jun 2025 4 1,078.500 Y Sep 2024 1.1) ESRP AFLOAT Modernized System 2026 V2X / Indianapolis SS / CPFF NAVWAR Feb 2026 Jun 2026 2 1,100.333 Y Sep 2025 2025 National Weather Service (NWS) / MD MIPR NWS Jan 2025 May 2025 15 207.867 Y 2026 National Weather Service (NWS) / MD MIPR NWS Jan 2026 May 2026 13 216.538 Y 2027 National Weather Service (NWS) / MD MIPR NWS Jan 2027 May 2027 9 218.778 Y 2025 Enterprise Electronics Corp. / AL C / FP NIWC LANT Feb 2025 Jul 2025 9 157.222 Y Nov 2023 2026 Enterprise Electronics Corp. / AL C / FP NIWC LANT Feb 2026 Jul 2026 9 163.886 Y Nov 2024 2027 Enterprise Electronics Corp. / AL C / FP NIWC LANT Feb 2027 Jul 2027 10 164.818 Y Nov 2025 2) SP550 METOC SASC Upgrades 2.1) Automated Surface Observing System (ASOS) Upgrades (1) 2.1) Automated Surface Observing System (ASOS) Upgrades (1) 2.1) Automated Surface Observing System (ASOS) Upgrades (1) 2.2) Supplemental Weather Radar (SWR) Upgrades (2) 2.2) Supplemental Weather Radar (SWR) Upgrades (2) 2.2) Supplemental Weather Radar (SWR) Upgrades (2) 3) SP600 Littoral Battlespace Sensing - Unmanned Undersea Vehicles (LBS-UUV) 3.1) LBS-Gliders (LBS-G) (3) 2025 Teledyne Brown Eng / AL Various NAVWAR Mar 2025 Feb 2026 15 245.867 Y Jul 2024 3.1) LBS-Gliders (LBS-G) (3) 2026 Teledyne Brown Eng / AL Various NAVWAR Mar 2026 Feb 2027 12 250.800 Y Jul 2025 3.1) LBS-Gliders (LBS-G) (3) 2027 Teledyne Brown Eng / AL Various NAVWAR Mar 2027 Feb 2028 7 256.714 Y Jul 2026 2025 Teledyne Brown Eng (8) / AL Various NAVWAR Oct 2024 Jan 2025 11 72.909 Y Oct 2024 2026 Teledyne Brown Eng (8) / AL Various NAVWAR Oct 2025 Jan 2026 10 74.114 Y Oct 2025 2027 Teledyne Brown Eng (8) / AL Various NAVWAR Oct 2026 Jan 2027 7 75.143 Y Oct 2026 2025 Intellisense Systems, Inc. / CA MIPR Air Force Mar 2025 Jun 2025 37 26.081 Y Jan 2023 2026 Intellisense Systems, Inc. / CA MIPR Air Force Mar 2026 Jun 2026 11 28.150 Y Jan 2024 2027 Intellisense Systems, Inc. / CA MIPR Air Force Mar 2027 Jun 2027 10 29.000 Y Jan 2025 3.2) LBS-UUV Upgrades/Backfits (4) 3.2) LBS-UUV Upgrades/Backfits (4) 3.2) LBS-UUV Upgrades/Backfits (4) 4) SP660 Tactical METOC Applications 4.2) Naval Integrated METOC Systems(NIMS) Sensors (5) 4.2) Naval Integrated METOC Systems(NIMS) Sensors (5) 4.2) Naval Integrated METOC Systems(NIMS) Sensors (5) LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 6 of 7 P-1 Line #99 Volume 3 - 124 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 4226 / Meteorological Equipment Method/Type or Funding Vehicle Aggregated Items: Meteorological Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 5) SP220 Hazardous Weather Detection and Display Capability (HWDDC) 5.1) HWDDC EASR (SW v4.0) 2025 BCI / NJ C / CPFF NIWC PAC Apr 2025 Apr 2026 2 351.000 Y Jan 2025 5.1) HWDDC EASR (SW v4.0) 2026 BCI / NJ C / CPFF NIWC PAC Apr 2026 Apr 2027 2 358.000 Y Jan 2026 5.1) HWDDC EASR (SW v4.0) 2027 BCI / NJ C / CPFF NIWC PAC Apr 2027 Apr 2028 2 366.730 Y Jan 2027 Footnotes: (8) Reorder procurement lead time adjusted in alignment with actual timelines. LI 4226 - Meteorological Equipment Navy UNCLASSIFIED Page 7 of 7 P-1 Line #99 Volume 3 - 125 === page 202 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 126 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4248 / Airborne MCM Program Elements for Code B Items: N/A Other Related Program Elements: 0604373N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 119.304 119.304 119.304 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 10.643 9.643 9.507 0.000 9.507 8.294 10.718 10.933 11.152 - - - - - - - - - - - 10.643 9.643 9.507 0.000 9.507 8.294 10.718 10.933 11.152 - - - - - - - - - - - 10.643 9.643 9.507 0.000 9.507 8.294 10.718 10.933 11.152 - 0.959 Continuing Total 190.194 190.194 190.194 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.298 - 0.351 - 0.351 0.521 0.537 1.032 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Airborne Mine Countermeasures (AMCM) Equipment is currently deployed on MH-60S and MH-53E helicopters to counter the threat of sea mines. The Navy's MH-53E helicopter and its associated AMCM Systems are intended to be divested through FY 2028. This divestment is associated with fulfillment of the National Defense Authorization Act for FY 2018 by the Littoral Combat Ship (LCS) Mine Countermeasures (MCM) Mission Package (MP). Fielding and first deployment of the MCM MP onboard LCS occurred in FY 2025. Fleet usage has continued to increase, resulting in increased sustainment and depot activities for MH-60S MCM systems. InService teams are addressing obsolescence and AMCM system updates. The equipment is divided into two categories -- minehunting and mine neutralization. In minehunting, mine-like objects are located and classified (usually by means of high-resolution sonar or optical systems). The fleeted system for this task is AN/AES-1 Airborne Laser Mine Detection System (ALMDS) on the MH-60S helicopter. Finally, mines are neutralized using explosive devices. This includes the AN/ASQ-235 Archerfish neutralizer on the MH-60S. Current world mining threats have resulted in increased operational demand of systems to perform AMCM missions. Fleets require increased AMCM capability to address warfighting gaps and the reliability, maintainability, and availability of critical systems to perform world-wide operations. The AMCM program provides systems to address a global threat and serves to deter placement of sea mines. Lack of AMCM capability will result in loss of the Fleet's ability to conduct freedom of maneuver and poses increased risk to ships operating in mine threat areas. In addition, the MEDAL MINEnet Tactical (MNT), Minefield Planning (MFP), and NSAM are software systems that have associated hardware components. MINEnet Tactical (MNT) is the Navy's single mine warfare (MIW) tactical decision aid (TDA) that provides tactical planning, post-mission evaluation, and situational awareness. Minefield Planning (MFP) is software that provides users the ability to plan and assess minefields based on user specified objective, targets, and environmental data. Net-Centric Sensor Analysis for MIW (NSAM) replaced the Organic Post Mission Analysis (OPMA) system and provides post mission analysis (PMA) capabilities for the Airborne Laser Mine Detection System (ALMDS) and the Airborne Mine Neutralization System (AMNS) and integrated contact management capabilities for ALMDS, AMNS, AN/AQS-20C. [P5 / MODIFICATIONS]: Funds support the modification and product improvement of AMCM systems to accommodate replacement of subsystems/components because of safety, maintainability, reliability, and obsolescence issues. Engineering Change Proposals (ECPs) generated from obsolescence issues and parts failures are necessary to sustain the operational availability and reliability of the Fleet's AMCM program through end of service life. Additionally, as the systems have aged, operational and intermediate level maintenance actions on the systems have failed to return assets to Ready for Issue (RFI) condition. Depot level overhauls of these systems and components are required to ensure the systems are sustainable through the end of their service life. ECPs are analyzed, prioritized, and screened to accommodate LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 1 of 7 P-1 Line #100 Volume 3 - 127 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4248 / Airborne MCM Program Elements for Code B Items: N/A Other Related Program Elements: 0604373N Line Item MDAP/MAIS Code: N/A replacement of subsystems/components. Funds will also support upgrades of hardware to maintain their system's operational availability as more demanding operational support and software requirements are levied on aging hardware. Cybersecurity upgrades are required to ensure compliance with Department of Navy's Risk Management Framework process. - AN/ASQ-235 Airborne Mine Neutralization System (AMNS): Funds support a mine neutralization system that provides a remotely controlled expendable mine neutralization device deployed from the MH-60S helicopter platform to reacquire, identify, and neutralize moored and proud sea mines. Updates are planned for the Launch and Handling System (LHS). - AN/AES-1 Airborne Laser Mine Detection System (ALMDS): Funds support a mine hunting system that provides organic rapid wide-area reconnaissance and assessment of mine threats in littoral zones, confined straits, choke points, and amphibious objective areas for Carrier Strike Groups and Expeditionary Strike Groups. ALMDS is a light detection and ranging (LIDAR) system for high area coverage, rapid detection, classification, and localization of near surface and moored sea mines operating from the MH-60S helicopter platform. This funding line supports modification and product improvements of ALMDS to address obsolescence issues of a 20-year-old design. These include, but are not limited to those identified in the receiver, laser, and the Central Electronics Chassis (CEC) to ensure the systems are sustainable through the end of their service life which is projected through 2045. Modernization efforts will contribute to improved Command and Control (C2), Automated Target Recognition (ATR) updates and continued software modifications to improve simulation software and cybersecurity. [P5 - 2 / NSAM]: Net-Centric Sensor Analysis for MIW (NSAM) replaced the Organic Post Mission Analysis (OPMA) system and NSAM provides post mission analysis (PMA) capabilities for the Airborne Laser Mine Detection System (ALMDS) and the Airborne Mine Neutralization System (AMNS) and integrated contact management. Additionally, NSAM will replace the AN/AQS-20C interim Post Mission Analysis (iPMA) system. NSAM will be the single tactical and environmental PMA system for all future Mine Warfare (MIW) sensor data and will provide integrated contact management capabilities. [P5 - 2 / Hardware]: FY 2025-FY 2026 NSAM funding supports hardware procurement to address Diminishing Manufacturing Sources and Material Shortages (DMSMS), obsolescence issues, and processing power requirements. Funding supports partial replacement of existing hardware. [P5 - 3 / MINEnet Tactical (MNT)]: FY2026-FY2027 funding procures MNT hardware and spares to replace obsolete computers and remain cybersecurity compliant. The funding also includes associated labor costs. [P5 - 4 / Minefield Planning (MFP)]: FY2026-FY2027 funds procure hardware for deployment and spares. LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 2 of 7 P-1 Line #100 Volume 3 - 128 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4248 / Airborne MCM Program Elements for Code B Items: N/A Other Related Program Elements: 0604373N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / MODIFICATIONS / 118.503 - / 9.903 - / 6.882 - / 7.936 - / 0.000 - / 7.936 P-5 2 / NSAM - / 0.801 - / 0.740 - / 0.589 - / 0.000 - / 0.000 - / 0.000 P-5 3 / MINEnet Tactical (MNT) - / 0.000 - / 0.000 - / 1.808 - / 1.256 - / 0.000 - / 1.256 P-5 4 / Minefield Planning (MFP) - / 0.000 - / 0.000 - / 0.364 - / 0.315 - / 0.000 - / 0.315 P-40 Total Gross/Weapon System Cost / 119.304 - / 10.643 - / 9.643 - / 9.507 - / 0.000 - / 9.507 - - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 1 / MODIFICATIONS: FY 2027 funding supports modifications, product improvements, and engineering change proposals (ECPs) of the AN/AES-1 Airborne Laser Mine Detection System (ALMDS) and AN/ASQ-235 Airborne Mine Neutralization System (AMNS) Launch and Handling System (LHS). Flight hours for ALMDS and AMNS are expected to increase due to these systems replacing the legacy systems. Both of these AMCM systems entered service in 2017 and a number of components have been identified for replacement due to obsolescence. Replacement will improve reliability, availability, and performance. In addition to the ongoing ECPs and modernization of the ALMDS Automatic Target Recognition (ATR) algorithm, ALMDS is refurbishing its Laser Transmitter Unit (LTU) coolant o-rings. This repair requires all 29 LTUs to undergo refurbishments. 2/ NSAM: FY 2025-2026 NSAM funding supports procurement of NSAM computers. FY 2027 no further funding. 3/ MNT: FY2026-FY2027 funding procures MNT hardware and spares to replace obsolete computers and remain cybersecurity compliant, in addition to associated labor costs. 4/ MFP: FY2026-FY2027 funds procure hardware for deployment and spares requirements. LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 3 of 7 P-1 Line #100 Volume 3 - 129 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4248 / Airborne MCM Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MODIFICATIONS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 9.903 6.882 7.936 0.000 7.936 - Gross/Weapon System Cost ($ in Millions) 118.503 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 118.503 Plus CY Advance Procurement ($ in Millions) - - - - - 9.903 6.882 7.936 0.000 7.936 - Total Obligation Authority ($ in Millions) 118.503 FY 2027 Total - - - - - 9.903 6.882 7.936 0.000 7.936 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - S0020 MODIFICATIONS Cost Recurring Cost 1.1.1) S0020 MODIFICATION - - 118.503 - - 9.903 - - 6.882 - - 7.936 - - 0.000 - - 7.936 Subtotal: Recurring Cost - - 118.503 - - 9.903 - - 6.882 - - 7.936 - - 0.000 - - 7.936 Subtotal: Hardware - S0020 MODIFICATIONS Cost - - 118.503 - - 9.903 - - 6.882 - - 7.936 - - 0.000 - - 7.936 Gross/Weapon System Cost - - 118.503 - - 9.903 - - 6.882 - - 7.936 - - 0.000 - - 7.936 LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 4 of 7 P-1 Line #100 Volume 3 - 130 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4248 / Airborne MCM Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / NSAM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.801 0.740 0.589 0.000 0.000 0.000 - - - - - - 0.801 0.740 0.589 0.000 0.000 0.000 - - - - - - 0.801 0.740 0.589 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) NSAM - - 0.801 - - 0.740 - - 0.589 - - 0.000 - - 0.000 - - 0.000 - - 0.801 - - 0.740 - - 0.589 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware Hardware Cost - - 0.801 - - 0.740 - - 0.589 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 0.801 - - 0.740 - - 0.589 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 5 of 7 P-1 Line #100 Volume 3 - 131 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4248 / Airborne MCM Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / MINEnet Tactical (MNT) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 0.000 1.808 1.256 0.000 1.256 - - - - - - 0.000 0.000 1.808 1.256 0.000 1.256 - - - - - - 0.000 0.000 1.808 1.256 0.000 1.256 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) MNT - - 0.000 - - 0.000 - - 1.808 - - 1.256 - - 0.000 - - 1.256 - - 0.000 - - 0.000 - - 1.808 - - 1.256 - - 0.000 - - 1.256 Subtotal: Hardware Hardware Cost - - 0.000 - - 0.000 - - 1.808 - - 1.256 - - 0.000 - - 1.256 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 1.808 - - 1.256 - - 0.000 - - 1.256 Subtotal: Recurring Cost LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 6 of 7 P-1 Line #100 Volume 3 - 132 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4248 / Airborne MCM Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 4 / Minefield Planning (MFP) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 0.000 0.364 0.315 0.000 0.315 - - - - - - 0.000 0.000 0.364 0.315 0.000 0.315 - - - - - - 0.000 0.000 0.364 0.315 0.000 0.315 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) MFP - - 0.000 - - 0.000 - - 0.364 - - 0.315 - - 0.000 - - 0.315 - - 0.000 - - 0.000 - - 0.364 - - 0.315 - - 0.000 - - 0.315 Subtotal: Hardware Hardware Cost - - 0.000 - - 0.000 - - 0.364 - - 0.315 - - 0.000 - - 0.315 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.364 - - 0.315 - - 0.000 - - 0.315 Subtotal: Recurring Cost LI 4248 - Airborne MCM Navy UNCLASSIFIED Page 7 of 7 P-1 Line #100 Volume 3 - 133 === page 210 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 134 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 643.466 643.466 643.466 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 99.656 99.656 99.656 111.334 111.334 111.334 116.873 - 0.000 - 116.873 - 0.000 - 116.873 0.000 116.873 116.873 116.873 126.891 126.891 126.891 134.871 134.871 134.871 145.031 145.031 145.031 To FY 2031 Complete 147.887 Continuing 147.887 Total - Continuing Continuing - Continuing - - Continuing Continuing 9.526 Continuing Continuing 147.887 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.279 2.025 7.667 - 7.667 11.342 7.051 5.449 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [P40A / S7039 - Aviation Data Warehouse Environment]: Decision Knowledge Programming for Logistics Analysis and Technical Evaluation (DECKPLATE) (S7039): DECKPLATE is the next generation of Naval Aviation Logistics Data Analysis (NALDA) and will interface with Navy Enterprise Resource Planning (ERP) data and Logistics IT source systems as the Naval Aviation Business Warehouse. It provides the technological improvements and process streamlining required to enable a cost wise transition from the NALDA program to the capabilities required in the Navy Digital Transformation Road Map. DECKPLATE is a commercial off-the-shelf (COTS) intensive system under which numerous stovepipe legacy systems will migrate to create an integrated data environment through the use of Data Warehouse tools and concepts in support of Naval aviation logistics needs. This is being accomplished by upgrading current Naval Aviation logistics reporting mechanisms through the implementation of a COTS, web-based relational database that is secure, standardized, user-friendly, and comes fully licensed and warranted. Funding is required to procure the necessary hardware, networking, systems, applications software, infrastructure, and associated engineering and installation support. [P40A / S7041 - NFSA HW/SW]: Naval Aviation Logistics Command Management Information System/NAVAIR Fleet System Array (NALCOMIS/NFSA): Funding supports procurement of hardware/software for technical refresh for both shipboard and afloat units. NALCOMIS (also identified as Naval Air Systems Command Fleet Systems Array (NFSA)) is responsible for implementation of Mid-Tier Servers at 55 sites both shipboard and shore based. These Mid-Tier Servers replicate data from the Organizational and Intermediate level maintenance activities to DECKPLATE to provide near-real time data to decision makers at all levels. The Mid-Tier also allows data to be pushed from Headquarters activities to the fleet to support maintenance activities. [P40A / S7042 - JTDI HW/SW]: Joint Technical Data Integration (JTDI): Funding supports procurement of JTDI for installation on all Carrier (CV) and Amphibious Assault (L) class ships and up to Navy/Marine Corps aviation activities. JTDI is a digital technical data access, delivery and local Organizational and Intermediate (O&I) level library management toolset and enabler of condition-based maintenance processes. It improves accuracy and timeliness of weapon system repair manuals and other technical data delivery and minimizes the Fleet's library management burden. JTDI reduces maintenance man hours with savings Return on Investment (ROI) of 2.5:1 and savings/avoidance ROI of 9.5:1. JTDI also automates the movement of Condition Based Maintenance Plus (CBM+) data generated by smart weapon systems deployed around the globe, consolidates and makes platform sensor data available for automated ingest into the Standard Data Repository which provides modern, highly integrated analytic capabilities to enable condition-based maintenance processes, improve aircraft readiness, and identify opportunities to reduce weapon system maintenance costs. JTDI data transport capabilities support the future state for Logistics IT and Readiness: Naval Product Lifecycle Management (N-PLM), Naval Maintenance, Repair, and Overhaul (N-MRO), Naval Supply Chain Management (N-SCM), and Integrated Data Environment (IDE). [P40A / S7048 - CBM+ HW/SW]: Condition Based Maintenance Plus (CBM+) (S7048): The CBM+ solution is an initiative which provides Naval Aviation Enterprise with common enabling capabilities which deliver timely data-driven decisional information to optimize aircraft availability and materiel readiness by incorporating health and usage leading indicators into the failure mode mitigation process. These CBM capabilities enable the Warfighters to more efficiently meet mission requirements through automated analysis and decision making processes. The CBM+ Initiative increases readiness through streamlined LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 1 of 26 P-1 Line #101 Volume 3 - 135 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A maintenance processes, actionable logistics/engineering data and integrated analytics not previously available, enabling engineers and acquisition professionals to support system improvements based on CBM + acquired data and analytic results. CBM+ provides the required infrastructure and storage solutions within an Enterprise common environment needed to store and analyze weapon system sensor data to extend the life of current and new acquisition aircraft, while scaling CBM+ across NAVAIR programs and realizing savings from reductions in field (organizational and intermediate) maintenance actions, reduced functional check flight hours, mishap mitigation, and reduced parts usage. [P40A / S7049-Digital Production Floor]: Commander Fleet Readiness Center (COMFRC) Digital Production Floor (DPF): DPF initiative brings Navy Aviation Depots into the 21st Century by removing paper from the production floor and integrating key quality elements to support a true digital North Star to ensure viability and alignment with broader Naval Logistics IT (LOG-IT) enterprise initiatives to realize a fully unified digital sustainment capability. This capability aligns and leverages ongoing Digital Thread /Aviation Product Lifecycle Management (AvPLM) efforts to transform our existing way of doing business and align us with commercial best practices for digitization of business processes. Current paper based processes have demonstrated inefficiencies and administrative delays in performance and quality of product on Depot level repair turnaround times. [P40A / S7050-Digital Toolboxes]: Commander Fleet Readiness Center (COMFRC) Digital Toolboxes: In alignment with the COMFRC Digital Production Floor (DPF) and broader Naval Logistics IT (LOGIT) enterprise initiatives, this initiative will deploy standardized digital tool boxes to Navy Aviation Depots. This capability aligns and leverages ongoing Digital Thread /Aviation Product Lifecycle Management (AvPLM) efforts to transform our existing way of doing business and align us with commercial best practices for digitization of business processes. In addition to fielding the tool boxes, the intent is to implement common business methodologies across Depot activities, subsequently capturing the data collected into the LOG-IT enterprise architecture for iterative planning, analysis, reporting and metrics supporting leadership objectives. [P40A / Inactive Projects]: Inactive projects prior year totals. [P5 / NGSR - SY515]: NEXT GENERATION SURVIVAL RADIO (NGSR) - SY515 (Baseline) The NGSR is a replacement for the Combat Survivor Evader Locator (CSEL) Radio. CSEL is out of production and facing obsolescence support issues. NGSR is a USAF led Joint Program Office (JPO). The JPO is funding all development. Requested funds will cover full rate production for Navy radios. NGSR will provide a modern, more secure isolated personnel recovery device which is smaller and lighter than the current CSEL. [P5 / SVSI - SY180]: ROTARY WING / TILT ROTOR SURVIVAL VEST SYSTEMS IMPROVEMENT (SVSI) - SY180 (Baseline) The improved SVSI Ensemble addresses safety and performance issues with the currently fielded vest system. Supports the procurements of new survival vest and reduction or miniaturization of body-mounted Aviation Life Support Systems. [P5 / IJHMCS - SY215]: IMPROVED JOINT HELMET MOUNTED CUEING SYSTEM (IJHMCS) - SY215 (Baseline) Supports the procurement of the upgraded helmet mounted solution for the F/A-18E/F and EA-18G aircraft. IJHMCS will mitigate aircrew back and neck strain/fatigue and replace the JHMCS Helmet Mounted Day Display and Night Vision Cueing Device (NVCD) with a single day/night, digital color-capable helmet-mounted display. [P5 / HPH - SY505]: HEARING PROTECTION HELMET (HPH) - SY505 (Baseline) Hearing loss is a significant cost driver across DoW in veteran disability compensation. Noise levels in Naval Aviation environments present a risk for permanent hearing loss in aircrew and aviation maintainers if not mitigated. Joint efforts are underway to incrementally field improved technology solutions as they become available to better mitigate operator impacts. Increment 1 Double Hearing Protection (DHP) solutions were developed for aviation maintainers and began fielding in 2011. Increment 2 Triple Hearing Protection (THP) solutions will further improve noise reduction for more challenging environments. THP variants also incorporate a flight deck communications capability. Increment 3 Hearing Protection Helmet (HPH) will address associated design trade improvements including weight reduction and center of gravity adjustments to reduce neck stresses, improved impact liner, night vision/cueing mounts, and potential incorporation of maturing technologies. These technologies include active digital noise reduction/ cancellation, Face-to-Face communication, F/A-18 and F-35 ICS Interface, and Flight Deck Radio/Sound Powered Phone (SPP) communication capability. [P5 / HMR - SY141]: HELMET/MASK REGULATOR (HMR) - SY141 (Baseline) LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 2 of 26 P-1 Line #101 Volume 3 - 136 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A HMR is a family of configuration items which, together, mitigate the risk of physiological episodes. Each configuration item; the helmet, the mask, and the regulator, will be procured separately as they are qualified. Quantity and unit cost are managed per configuration item. [P5 / ASIP - SY126]: AIRCREW SYSTEMS IMPROVEMENT PROGRAM (ASIP) - SY126 (Baseline) ASIP is modeled after the platform Operational Safety Improvement Program (OSIP) concept, with the objective of supporting the human (aircrew and aviation maintainers) as the weapon system platform. The Aircrew Systems portfolio exceeds 1,000 products. The majority of these products are Aviation Life Support Systems/Equipment (ALSS/E) that directly affect aircrew and aviation maintainer personnel safety and survivability, both in combat and non-combat operations. Other systems enhance aircrew and maintainer performance as the human element of the total weapon platform by enabling effective warfighting at night and physical endurance over extended missions. As legacy products age and missions are modified to address evolving threats and tactics, Fleet operators identify several items each year that must be modified to ensure safety and survivability, and address obsolescence. ASIP funding enables the program office to proactively manage or rapidly react to discrepancies and deficiencies across a broad portfolio. ASIP provides the resources to correct such issues via lower-scope Non-Recurring Engineering (NRE) efforts and Engineering Change Proposals (ECPs), and/or qualification and procurement of improved capability commercial off-the-shelf (COTS), Non-Developmental Items (NDI) from industry or other service counterparts. Correction and enhancement efforts range from minor adjustments of survival kit items (such as brighter, lighter, and longer-lasting illumination devices and signaling rescue devices) to expeditiously identify and field Aircrew Systems safety-related deficiencies. ASIP enables the program office to address smaller scope, but critical Fleet safety of flight issues. The ASIP model enables the program office to shift resources as necessary and be more agile in assessing and addressing issues. The assessment is based on Fleet prioritization of identified issues, the level of improvement that a potential solution can provide, and the degree of maturity of that solution (readiness to be fielded). [P5 - 2 / S6003 Aviation Maintenance Advancement Solution]: Aviation Maintenance Advancement Solutions (AMAS) program integrates the Portable Electronic Maintenance Aid (PEMA) with the Standard PEMA Cyber Solution (SPECS) programs and Augmented Reality Maintenance System (ARMS). The AMAS program will continue to deliver PEMA capability by providing commercial off-the-shelf (COTS) hardware integrated with Standard PEMA Cyber Solution (SPECS) Government off-the-shelf (GOTS) software solution. AMAS creates an integrated, cost-efficient maintenance and logistics support system for the warfighter. PEMA hardware is an unclassified support equipment device used by maintenance personnel to perform maintenance, inspection, fault diagnosis, and repair tasks in direct support of a Weapon System. PEMA hardware serves as a host for Interactive Electronic Technical Manuals, Automated Logistics Environment and Diagnostic/Prognostic applications. SPECS software Information System takes advantage of advance information technologies available in areas of personal computer networks, data communications, automatic Technical Publication and Software Information Assurance Availability Alert (IAVA) distribution, Host Based Security System (HBSS) Common Access Card (CAC)/Public Key Infrastructure (PKI), Full Disk Encryption and Assured Compliance Assessment Solution (ACAS). The employment of these technologies and future Virtual Private Networking (VPN) enhancements for efficient data movement enables the warfighter to focus on the mission while realizing increased efficiencies, improved security compliance, and reduction in sustainment costs over time. FY 2027 introduces the development and testing of Augmented Reality Maintenance System (ARMS) effort under the Aviation Maintenance Advancement Solutions (AMAS). ARMS is a Department of the Navy (DON)-developed software suite designed to enhance maintenance effectiveness by providing real-time communication and collaboration capabilities between Subject Matter Experts (SMEs) and maintainers at the point of maintenance. This capability will improve troubleshooting accuracy, reduce Mean Time To Repair (MTTR), and increase aircraft availability. [P3A / ALIS - Program Support]: Autonomic Logistics Information System (ALIS) Ship Integration - CVN, LHD, LHA: ALIS controls all aspects of F-35 mission planning, maintenance, logistics, and supply functions. Funding for ALIS Ship Integration efforts (Programmatic Support, Engineering Support Services, Material, and Installation efforts) will enable shipboard (CVN, LHD, LHA) modification, classified/ unclassified network integration, the installation of ALIS-related shipboard equipment, ALIS security accreditation, and verification of ALIS operation and functionality to include the integration of ALIS with shipboard Command, Control, Communications and Computers & Intelligence (C4I) Networks and the Prognostic Health Management (PHM) downlink. At the completion of each installation, the respective ship's ALIS will enable the F-35 system to provide, at the appropriate security levels via Navy Local Area Networks (LANs)/Wide Area Networks (WANs), the ability to transfer time-sensitive data for logistics support, mission planning, mission execution, and mission debriefing. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 3 of 26 P-1 Line #101 Volume 3 - 137 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Aviation Support Equipment P-5a - / 103.929 - / 12.566 - / 9.678 - / 6.441 / - - / 6.441 P-5 1 / Aviation Life Support P-5a, P-21 - / 383.111 - / 60.331 - / 79.957 - / 82.589 - / 0.000 - / 82.589 P-5 2 / Aviation Maintenance Advancement Solutions (AMAS) P-5a, P-21 - / 118.326 - / 17.372 - / 17.577 - / 17.019 - / 0.000 - / 17.019 P-3a 1 / ALIS SHIP INSTALLATION (Add Capability) - / 38.100 - / 9.387 - / 4.122 - / 10.824 - / 0.000 - / 10.824 P-40 Total Gross/Weapon System Cost - / 643.466 - / 99.656 / 111.334 - / 116.873 - / 0.000 - / 116.873 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Aviation Support Equipment P-5a - / - - / - - / - - / - - / - - / - P-5 1 / Aviation Life Support P-5a, P-21 - / - - / - - / - - / - - / - - / - P-5 2 / Aviation Maintenance Advancement Solutions (AMAS) P-5a, P-21 - / - - / - - / - - / - - / - - / - P-3a 1 / ALIS SHIP INSTALLATION (Add Capability) P-40 Total Gross/Weapon System Cost - / 4.435 / 126.891 - / 4.509 / 134.871 - / 4.614 / 145.031 / 4.708 Continuing Continuing / 147.887 Continuing Continuing - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Budget Request includes funding for the following ($116.873M): P-40A (S7042), $2.175M Other Aviation Support Equipment - the procurement of hardware and associated support costs for JTDI (S7042). Procurement of Defense Enterprise Computing Center data center and cloud services; COTS hardware and software in support of ship, shore, and expeditionary aviation activities; and cyber security and program support services. JTDI is the common, enterprise solution for transporting authoritative technical data and CBM+ data to/from globally deployed aviation fleet activities and provides a common repository for raw CBM+ data which eliminates the need for weapon system programs to develop and maintain duplicative, platform-unique IT solutions. P-40A (S7048), $0M Other Aviation Support Equipment - the procurement of hardware and associated support costs for CBM+ (S7048). Condition Based Maintenance Plus (CBM+) is a maintenance optimization program that can generate significant benefits through maintenance program resets, maintenance effectiveness reviews, and active reliability centered maintenance (RCM) strategies at the program level. Employed as an enduring cross-life-cycle maintenance strategy, the program offers a technical solution to reduce maintenance burdens, increase operational availability and mission reliability of monitored systems, assists with identifying enterprise-wide cost avoidance, and will reduce overall life cycle costs. As a function of the Rapid Sustainment Improvement Process (RSIP), the CBM+ system will be installed on three to five surface combatants for selected shipboard equipment. Sensors for these systems will be defined, procured and installed. Further, the CBM+ system will be integrated with the Naval Maintenance, Repair, and Overhaul (N-MRO) suite of programs onboard ship to facilitate on ship and off ship monitoring. P-40A (S7041), $0.480M LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 4 of 26 P-1 Line #101 Volume 3 - 138 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Other Aviation Support Equipment - Naval Aviation Logistics Command Management Information System/Naval Air Systems Command Fleet System Array (NALCOMIS/NFSA) (S7041) consists of the purchase of multiple components, which includes servers, peripheral hardware and software rack mounted into one server suite. Funds are required to manage obsolescence, comply with Cyber Security mandates which would lead to IT system shutdown without adherence, and provide fleet data replication and analysis processes to monitor safety and readiness of the Fleet. P-40A (S7039), $0M Other Aviation Support Equipment - Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analysis and Technical Evaluation (DECKPLATE)(S7039) consists of the purchase of multiple components, which includes servers, peripheral hardware and software rack mounted into one server suite. Funds are required to manage obsolescence and comply with CYBER WARFARE/ and fleet data replication and analysis processes used to monitor safety and readiness of the Fleet as well as the ability to comply with mandatory Information Security (IA) mandates, which would lead to IT system shutdown without adherence. Analysis of cloud solutions may be required as we modernize and align DECKPLATE to future warehousing requirements such as Vision 2020, the future Naval Aviation Maintenance System (NAMS), and the Automated Logistics Environment. P-40A (S7049), $0.731M Other Aviation Support Equipment - the procurement of hardware and associated support costs for Commander Fleet Readiness Center (COMFRC) Digital Production Floor (DPF). P-40A (S7050), $2.269M Other Aviation Support Equipment - Commander Fleet Readiness Center (COMFRC) Digital Toolboxes: In alignment with the COMFRC Digital Production Floor (DPF) and broader Naval Logistics IT (LOG-IT) enterprise initiatives, this initiative will deploy standardized digital toolboxes to Navy Aviation Depots. This capability aligns and leverages ongoing Digital Thread /Aviation Product Lifecycle Management (AvPLM) efforts to transform our existing way of doing business and align us with commercial best practices for digitization of business processes. In addition to fielding the toolboxes, the intent is to implement common business methodologies across Depot activities, subsequently capturing the data collected into the LOG-IT enterprise architecture for iterative planning, analysis, reporting and metrics supporting leadership objectives. P-40A (S7833), $0.786M Other Aviation Support Equipment - Production Engineering Support provided in support of Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analysis and Technical Evaluation (DECKPLATE)(S7039), Joint Technical Data Integration (JTDI) (S7042), Condition Based Maintenance Plus (CBM+) (S7048), Naval Aviation Logistics Command Management Information System/ NAVAIR Fleet System Array (NALCOMIS/NFSA) (S7041), and Commander Fleet Readiness Center (COMFRC) Digital Production Floor (DPF)(S7049). P-5/1, $82.589M (Baseline) Aviation Life Support - the procurement of hardware and associated support costs for: Hearing Protection Helmets (HPH): Protects maintainers from daily high-level noise exposure produced by F-35 and F/A-18 aircraft. Addresses temporary hearing damage and permanent hearing loss while increasing the resilience of flight line personnel and increasing their comprehension of radio or ICS transmissions for increased mission effectiveness. Improved Joint Helmet Mounted Cueing System (IJHMCS): Addresses legacy JHMCS obsolescence, reduces weight, improves center of gravity to mitigate chronic back and neck injury, and reduces injury risk during ejection. System technology refresh enables heads up display of aircraft tactical situational awareness enhancements programmed for the cockpit displays and replaces legacy JHMCS and Night Vision Cueing Device (NVCD) with a single day/night high-definition color capable display of critical flight parameters and tactical data. RW/TR Survival Vest Systems Improvement (SVSI): Addresses safety and performance issues with the currently fielded vest system. Supports the procurements of new survival vest and reduction or miniaturization of body-mounted Aviation Life Support Systems. Back and neck injury mitigation has been the Aircrew Systems ENARG #1 priority for five years. Mitigates chronic back and neck injuries and provides a vest with an enhanced flotation system, reduced weight and bulk, enhanced armor protection effectiveness, mobility, thermal burden, and egress survivability. Aircrew Systems Improvement Program (ASIP): Supports the human (aircrew and aviation maintainers) as the weapon system platform that directly affects safety and survivability, both in combat and noncombat operation. Actual components to be determined during project selection in the year prior to execution. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 5 of 26 P-1 Line #101 Volume 3 - 139 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Helmet Mask Regulator (HMR): Reduces the likelihood of the occurrence of physiological episodes with the fielding of an improved helmet, mask, and regulator. Each item alone reduces risk, but synergistic effects are expected when the family of configuration items are fielded. Next Generation Survival Radio (NGSR): The NGSR is a replacement for the Combat Survivor Evader Locator (CSEL) Radio. CSEL is out of production and facing obsolescence support issues. NGSR is a USAF led Joint Program Office (JPO). The JPO is funding all development. Requested funds will cover full rate production for Navy radios. NGSR will provide a modern, more secure isolated personnel recovery device which is smaller and lighter than the current CSEL. P-5/2, $17.019M Aviation Maintenance Advancement Solution (AMAS) - The procurement of hardware, associated support and software cost for 3,116 Portable Electronic Maintenance Aid (PEMA) units in FY 2027. P-3a/1 $10.824M Autonomic Logistics Info Systems (ALIS) - supports Design Support Activities (DSA) to include material purchases for the installation of two (2) ALIS in FY 2027. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 6 of 26 P-1 Line #101 Volume 3 - 140 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) (Each) Other Aviation Support Equipment FY 2026 Total Cost Qty Aggregated Items Title: ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analys 1.1) S7039 - Aviation Data Warehouse Environment A 5,409K (2)(†) Subtotal: 1) Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analys - 3 - 16.228 1,864K 16.228 - 1 - 1.864 1,868K 1.864 - 2.694 2,651K 2.694 - 2.541 2,592K 2.541 - 1 - 1.868 0.00 1.868 - 1 - 0.000 - - - 0.00 - - - - - 0.480 - - - 0.480 - - - - 2.175 - - - 2,175K 2.175 - - - - 0.000 - - - 0.00 1 - 0.000 - 2) Naval Aviation Logistics Command Management Information System/Naval Air Systems Command F 2.1) S7041 - NFSA HW/SW (3)(†) A 7,562K Subtotal: 2) Naval Aviation Logistics Command Management Information System/Naval Air Systems Command F - 3 - 22.686 2,694K 22.686 - 16.128 2,541K 16.128 - 1 - 1 - 2.651 480,000.00 2.651 - 2.592 2,175K 2.592 - 0.261 0.00 1 - 480,000.00 1 - 0.480 0.480 3) Joint Technical Data Integration (JTDI) 3.1) S7042 - JTDI (†) A HW/SW 5,376K Subtotal: 3) Joint Technical Data Integration (JTDI) - 3 - 1 - 1 - 1 - 1 - 2.175 2.175 4) Condition Based Maintenance Plus (CBM+) 4.1) S7048 - CBM+ HW/SW (4)(†) A Subtotal: 4) Condition Based Maintenance Plus (CBM+) 627,666.67 3 1.883 259,000.00 1 0.259 261,000.00 1 1 1 0.000 - - 1.883 - - 0.259 - - 0.261 - - - - - - - - - - - 0.384 - - 0.183 - - - - - 0.275 - - - - - 0.275 - - 0.504 - - 0.083 - - 0.057 - - 0.043 - - - - - 0.043 - - 4.837 - - 0.551 - - 0.572 - - - - - - - - - - - 4.576 - - 0.451 - - 0.449 - - 0.250 - - - - - 0.250 - - 2.263 - - 0.207 - - 0.221 - - 0.218 - - - - - 0.218 - - 0.417 - - 0.053 - - 0.056 - - - - - - - - - - - 12.981 - - 1.528 - - 1.355 - - 0.786 - - - - - 0.786 5) Production Engineering Support 5.1) S7833-Digital Tooling A 5.2) S7833-Digital Production Floor A 5.3) S7833 - Aviation Data Warehouse Environment A 5.4) S7833 - Naval Air Systems Command Fleet System Arrays A 5.5) S7833 - Joint Technical Data Integration A 5.6) S7833 - Condition Based Maintenance Plus A Subtotal: 5) Production Engineering Support LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 7 of 26 P-1 Line #101 Volume 3 - 141 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) (Each) Other Aviation Support Equipment FY 2026 Total Cost Qty Aggregated Items Title: Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 6) Digital Production Floor 6.1) S7049-Digital Production Floor (5)(†) A Subtotal: 6) Digital Production Floor 3,310K - 2 - 6.620 1,264K 6.620 - 1 - 1.264 951,000.00 1 0.951 731,000.00 1 0.731 - - - 731,000.00 1 0.731 1.264 - - 0.951 - - 0.731 - - - - - 0.731 7) Digital Toolboxes 7.1) S7050-Digital Toolboxes (6)(†) A Subtotal: 7) Digital Toolboxes 2,696K 5.393 2,416K 2.416 - - - - - 2.269 - - - - - 2.269 - - 2 5.393 - - 1 2.416 - - - - - 2.269 - - - - - 2.269 - 8) Inactive Projects 8.1) Inactive Projects Prior Year Totals A - - 22.010 - - - - - - - - - - - - - - Subtotal: 8) Inactive Projects - - 22.010 - - - - - - - - - - - - - - - Total - - 103.929 - - 12.566 - - 9.678 - - 6.441 - - - - - 6.441 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Program provides for the acquisition, upgrade, and production support of aviation life support systems required for the personal safety and protection of aircrew against the hazards encountered in the aircraft operating environment and for safe recovery of downed aircrew. (2) Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analysis and Technical Evaluation (DECKPLATE)(S7039) - The unit cost reflects the total of all suites being procured in each fiscal year. Decrease in DECKPLATE - Logistics Information Technology (LOGIT) portfolio is due to reduction in NAVAIR DECKPLATE IT related hosting, products and services to include reductions in fleet facing data storage and analytics capabilities. (3) Naval Aviation Logistics Command Management Information System/Naval Air Systems Command Fleet System Array (NALCOMIS/NFSA) (S7041) - The unit cost reflects the total of all suites being procured in each fiscal year. NFSA decrease is attributed to reduced purchases of NFSA technology refresh hardware, including upgrades and replacement of legacy components that are no longer supported by manufacturers. (4) (5) (6) Decrease in CBM - Logistics Information Technology (LOGIT) portfolio is due to reduction in NAVAIR DECKPLATE IT related hosting, products and services to include reductions in fleet facing data storage and analytics capabilities. Digital Production Floor (S7049) - The unit cost reflects the total of all suites being procured in each fiscal year. Digital Toolboxes (S7050) - The unit cost reflects the total of all suites being procured in each fiscal year. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 8 of 26 P-1 Line #101 Volume 3 - 142 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Method/Type or Funding Vehicle Aggregated Items: Other Aviation Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) (1) RFP Issue Date 1) Naval Aviation Logistics Data Analysis Decision Knowledge Programming for Logistics Analys 1.1) S7039 - Aviation Data Warehouse Environment (2) 1.1) S7039 - Aviation Data Warehouse Environment (2) 1.1) S7039 - Aviation Data Warehouse Environment (2) 2025 Teradata Government Systems / Germantown MD C / CPFF NAVAIR Mar 2025 Mar 2026 1 1,864K Y Nov 2021 2026 Teradata Government Systems / Germantown MD C / CPFF NAVAIR Mar 2026 Mar 2027 1 1,868K Y Nov 2021 2027 Teradata Government Systems / Germantown MD C / CPFF NAVAIR Mar 2027 Mar 2027 1 0.00 Y Nov 2025 2,694K Y Jan 2025 2) Naval Aviation Logistics Command Management Information System/Naval Air Systems Command F 2.1) S7041 - NFSA HW/SW (3) 2025 VARIOUS / VARIOUS C / T&M NAVAIR May 2025 Sep 2025 1 2.1) S7041 - NFSA HW/SW (3) 2026 VARIOUS / VARIOUS C / T&M NAVAIR May 2026 Sep 2026 1 2,651K Y Jan 2026 2.1) S7041 - NFSA HW/SW (3) 2027 VARIOUS / VARIOUS C / T&M NAVAIR May 2027 Sep 2027 1 480,000.00 Y Jan 2026 3.1) S7042 - JTDI HW/SW 2025 Wyle / Huntsville, AL C / T&M DTIC Jul 2025 Oct 2025 1 2,541K Y May 2022 3.1) S7042 - JTDI HW/SW 2026 Wyle / Huntsville, AL C / T&M DTIC Jul 2026 Oct 2026 1 2,592K Y May 2022 3.1) S7042 - JTDI HW/SW 2027 Wyle / Huntsville, AL C / T&M DTIC Jul 2027 Jul 2027 1 2,175K Y May 2022 3) Joint Technical Data Integration (JTDI) 4) Condition Based Maintenance Plus (CBM+) 4.1) S7048 - CBM+ HW/SW (4) 2025 VARIOIUS / VARIOUS Various NAVAIR Feb 2025 Apr 2025 1 259,000.00 Y Nov 2024 4.1) S7048 - CBM+ HW/SW (4) 2026 VARIOIUS / VARIOUS Various NAVAIR Feb 2026 Apr 2026 1 261,000.00 Y Nov 2025 4.1) S7048 - CBM+ HW/SW (4) 2027 VARIOIUS / VARIOUS Various NAVAIR Feb 2027 Apr 2027 1 0.00 Y Nov 2026 2025 VARIOUS / VARIOUS C / FFP Patuxent River, MD Apr 2025 Apr 2026 1 1,264K Y Nov 2022 2026 VARIOUS / VARIOUS C / FFP Patuxent River, MD Apr 2026 Apr 2027 1 951,000.00 Y Nov 2022 2027 VARIOUS / VARIOUS C / FFP Patuxent River, MD Apr 2027 Apr 2028 1 731,000.00 Y Nov 2022 2025 VARIOUS / VARIOUS C / FFP Patuxent River, MD Apr 2025 Apr 2026 1 2,416K Y Nov 2022 6) Digital Production Floor 6.1) S7049-Digital Production Floor (5) 6.1) S7049-Digital Production Floor (5) 6.1) S7049-Digital Production Floor (5) 7) Digital Toolboxes 7.1) S7050-Digital Toolboxes (6) LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 9 of 26 P-1 Line #101 Volume 3 - 143 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Aviation Life Support MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 60.331 79.957 82.589 0.000 82.589 - Gross/Weapon System Cost ($ in Millions) 383.111 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 383.111 Plus CY Advance Procurement ($ in Millions) - - - - - 60.331 79.957 82.589 0.000 82.589 - Total Obligation Authority ($ in Millions) 383.111 FY 2027 Total - - - - - 60.331 79.957 82.589 0.000 82.589 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Survival Electronics Cost Recurring Cost 1.1.1) NGSR (†) (7) - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - - - 0.000 - - 2.448 - - - 0.000 5,067.86 1,400 7.095 171,834.97 612 105.163 170,411.76 34 5.794 7,369.35 6,728 49.581 8,301.76 1,024 8.501 845.64 29,800 25.200 716.21 33,000 23.635 (11) - - 0.000 - - 0.000 2.1.7) HNIM - SY139 - - 0.000 - - 0.700 - - 0.000 - - 0.000 SY515 Subtotal: Hardware Survival Electronics Cost 9,719.46 2,873 27.924 - - 0.000 - - 27.924 - - 0.000 0.000 - - 27.924 - - - 5.070 - - 0.000 - 296 1.500 3,888.17 465 1.808 - 14.400 466,568.63 51 3,000 21.556 6,730.33 - 0.000 3,018 7.267 - 2.813 - 5,000 9.000 - 9,719.46 2,873 27.924 - - 27.924 0.000 - - 27.924 - 0.000 - - 0.000 - - 0.000 3,888.17 465 1.808 23.795 - - 0.000 466,568.63 51 23.795 1,398 9.409 - - 0.000 6,730.33 1,398 9.409 - 0.000 - - 0.000 - 0.000 5,500 14.050 - - 0.000 5,500 14.050 - 0.000 - - 0.000 - - 0.000 - 0.000 - - 0.000 - - 0.000 Hardware - Helmets, Hearing and Display Cost Recurring Cost 2.1.1) AHP - SY520 (†) 2.1.2) SVSI - SY180 (8) 2.1.3) IJHMCS (†) (9) SY215 (†) 2.1.4) HPH - SY505 (10) 2.1.5) AMHHP (†) SY510 2.1.6) HMR - SY141 (†) 2.1.8) ISEA - SY143 LI 4268 - Aviation Support Equipment Navy 5,067.57 7,185.33 2,407.89 1,800.00 UNCLASSIFIED Page 10 of 26 2,554.55 P-1 Line #101 2,554.55 Volume 3 - 144 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Aviation Life Support MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Recurring Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 179.944 - - 48.173 - - 61.606 - - 49.062 - - 0.000 - - 49.062 - - 179.944 - - 48.173 - - 61.606 - - 49.062 - - 0.000 - - 49.062 5,310.88 3,860 20.500 4,769.23 104 0.496 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6,508K 8 52.066 4,771K 1 4.771 9,604K 9.604 2,980K 2.980 - - 0.000 2,980K Subtotal: Hardware Helmets, Hearing and Display Cost Hardware - Life Support Sytems Cost Recurring Cost 3.1.1) Phys Mon (†) SY127 (†) 3.1.2) ASIP - SY126 (12) Subtotal: Recurring Cost 1 1 1 2.980 - - 72.566 - - 5.267 - - 9.604 - - 2.980 - - 0.000 - - 2.980 - - 72.566 - - 5.267 - - 9.604 - - 2.980 - - 0.000 - - 2.980 - - 61.708 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 61.708 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 61.708 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 2.593 - - 0.000 - - 0.000 - - 0.650 - - 0.000 - - 0.650 - - 61.516 - - 6.197 - - 8.052 - - 1.782 - - 0.000 - - 1.782 (15) - - 4.784 - - 0.694 - - 0.695 - - 0.191 - - 0.000 - - 0.191 Subtotal: Support Production Support Cost - - 68.893 - - 6.891 - - 8.747 - - 2.623 - - 0.000 - - 2.623 Gross/Weapon System Cost - - 383.111 - - 60.331 - - 79.957 - - 82.589 - - 0.000 - - 82.589 Subtotal: Hardware - Life Support Sytems Cost Hardware Cost Non Recurring Cost 4.1.1) Inactive Projects Subtotal: Non Recurring Cost Subtotal: Hardware Cost Support - Production Support Cost 5.1) Survival Electronics - SY830 (13) 5.2) Helmets, Hearing and Displays - SY830 (14) 5.3) Life Support Systems - SY830 (†) indicates the presence of a P-5a Footnotes: (7) SY515 Next Generation Survival Radio (NGSR): NGSR starts LRIP procurement in FY 2027 in accordance with the approved acquisition strategy and procurement schedule. The NGSR is a replacement for the Combat Survivor Evader Locator (CSEL) Radio. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 11 of 26 P-1 Line #101 Volume 3 - 145 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4268 / Aviation Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Aviation Life Support MDAP/MAIS Code: (8) SY180 Rotary Wing / Tilt Rotor Survival Vest Systems Improvement (SVSI): SVSI procurements in FY 2027 in accordance with the approved acquisition strategy and procurement schedule. Current design cited as a causal factor in loss of aircrew during egress (HSC-8 SIR, 2021). Back and neck injury mitigation has been the Aircrew Systems ENARG #1 priority for five years. Mitigates chronic back and neck injuries and provides a vest with an enhanced flotation system, reduced weight and bulk, enhanced armor protection effectiveness, mobility, thermal burden, and egress survivability. Funding required to meet IOC. (9) SY215 Improved Joint Helmet Monted Cueing System (IJHMCS): IJHMCS continues procurement in FY 2027 in accordance with the approved acquisition strategy and procurement schedule. Mitigates aircrew back and neck strain/fatigue and replaces the JHMCS Helmet Mounted Day Display and Night Vision Cueing Device (NVCD) with a single day/night, digital color-capable helmet-mounted display. Provides critical flight parameters and expanded tactical data to improve aircrew performance and enhance operational and warfighting capability. FY 2027 IJHMCS change in quantity due to revised cost estimate which updated the unit cost to a more accurate amount. Prior totals on the IJHMCS line are from Night Cueing Vision Display (NVCD), which ended in FY 2020. NVCD is the predecessor solution for this capability requirement. (10) SY505 Hearing Protection Helmet (HPH): HPH continues procurement in FY 2027 in accordance with the approved acquisition strategy and procurement schedule. Hearing loss is a significant cost driver across DoW in veteran disability compensation. Hearing Protection Helmet (HPH) will address associated design trade improvements, including weight reduction and center of gravity adjustments to reduce neck stresses, improved impact liner, night vision/cueing mounts, and potential incorporation of maturing technologies. These technologies include active digital noise reduction/cancellation, Face-to-Face communication, F/A-18 and F-35 ICS Interface, and Flight Deck Radio/Sound Powered Phone (SPP) communication capability. Funding increased in FY 2026 to get max production rate of 3,000 units as the FY 2027 funding decreases to ensure full buyout HPH program in FY 2027. (11) SY141 Helmet/Mask Regulator (HMR): HMR continues procurement in FY 2027 in accordance with the approved acquisition strategy and procurement schedule. The quantity provided each year is an average of the total number of the family of configuration items required. Actual quantities will be managed per configuration item. FY 2027 increase is due to the mask starting LRIP in FY 2027 and the helmet will go from LRIP in FY 2026 to FRP in FY 2027. (12) SY126 Aircrew Systems Improvement Program (ASIP): FY 2027 quantities are established from the annual Aircrew Enabler Naval Aviation Requirements Group (ENARG), a Fleet demand signal event, and System Safety Working Group. The ASIP model enables the program office to shift resources as necessary and be more agile in assessing and addressing issues. The assessment is based on Fleet prioritization of identified issues, the level of improvement that a potential solution can provide, and the degree of maturity of that solution (readiness to be fielded). ASIP resources ensure deficiencies that threaten Aircrew safety, survivability, and performance, such as passive signaling for downed aviators, assured floatation, and chronic back and neck injury mitigation, are addressed in a timely manner. (13) (14) (15) SY830 Survival Electronics: Funds labor supporting Next Generation Survival Radio (NGSR) that starts procurements in FY 2027. Decrease in FY 2027 is due to directed Contract Services Reductions. SY830 Life Support Systems (LSS): Funds labor supporting ASIP products. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 12 of 26 P-1 Line #101 Volume 3 - 146 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 FY Contractor and Location 2027 General Dynamics / Falls Church, VA C / TBD TBD Dec 2026 Jun 2027 2,873 9,719.46 N 2025 Peckham Vocational Industries / Lansing, MI C / FFP Lansing, MI Jul 2025 Feb 2026 1,400 5,067.86 N 2026 Peckham Vocational Industries / Lansing, MI C / FFP Lansing, MI Mar 2026 Dec 2026 296 5,067.57 N 2027 Peckham Vocational Industries / Lansing, MI C / FFP Lansing, MI Mar 2027 Dec 2027 465 3,888.17 N 2025 Rockwell Collins - ESA Vision Systems / Dallas Ft. Worth, Texas C / TBD NAVAIR Jun 2025 Aug 2026 34 170,411.76 N 2027 Rockwell Collins - ESA Vision Systems / Dallas Ft. Worth, Texas C / TBD NAVAIR Jun 2027 Aug 2028 51 466,568.63 N 2.1.4) HPH - SY505 (†) 2024 Creare / Hanover, NH C / FFP NAVAIR Jun 2024 Dec 2024 1,900 6,804.21 N 2.1.4) HPH - SY505 (†) 2025 Creare / Hanover, NH C / FFP NAVAIR Apr 2025 Oct 2025 1,024 8,301.76 N 2.1.4) HPH - SY505 (†) 2026 Creare / Hanover, NH C / FFP NAVAIR Mar 2026 Sep 2026 3,000 7,185.33 N 2.1.4) HPH - SY505 (†) 1,398 6,730.33 N (†) 1.1.1) NGSR - SY515 2.1.2) SVSI - SY180 (†) 2.1.2) SVSI - SY180 (†) 2.1.2) SVSI - SY180 (†) (†) 2.1.3) IJHMCS - SY215 (†) 2.1.3) IJHMCS - SY215 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2027 Creare / Hanover, NH C / FFP NAVAIR Mar 2027 Sep 2027 (†) 2024 DLA / Philadelphia, PA C / FFP NO PCO Oct 2023 Oct 2023 5,000 720.00 N (†) 2025 DLA / Philadelphia, PA C / FFP NO PCO Oct 2024 Oct 2024 33,000 716.21 N 2.1.5) AMHHP - SY510 2.1.5) AMHHP - SY510 (†) 2026 TBD / TBD C / TBD TBD Mar 2026 Aug 2026 5,000 1,800.00 N (†) 2024 DLA Troop Support / Philadelphia, PA C / FFP NO PCO Sep 2024 Sep 2025 1,785 5,042.02 N (†) 2025 DLA Troop Support / Philadelphia, PA C / FFP NO PCO Sep 2025 Sep 2026 104 4,769.23 N 3.1.2) ASIP - SY126 (†) 2024 VARIOUS / VARIOUS Various VARIOUS Feb 2024 Apr 2024 1 9,896K N 3.1.2) ASIP - SY126 (†) 2025 VARIOUS / VARIOUS Various VARIOUS Feb 2025 Apr 2025 1 4,771K N 3.1.2) ASIP - SY126 (†) 2026 VARIOUS / VARIOUS Various VARIOUS Oct 2025 Dec 2025 1 9,604K N 3.1.2) ASIP - SY126 (†) VARIOUS / VARIOUS C / TBD ** NO PCO ** Oct 2026 Dec 2026 1 2,980K N 2.1.8) ISEA - SY143 3.1.1) Phys Mon - SY127 3.1.1) Phys Mon - SY127 (†) Item Number / Title [DODIC]: 1 / Aviation Life Support Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 4268 / Aviation Support Equipment 2027 (16) RFP Issue Date Sep 2024 indicates the presence of a P-21 Footnotes: (16) Contract vehicles and vendors vary depending on mix of ASIP items being procured in FY 2027. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 13 of 26 P-1 Line #101 Volume 3 - 147 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) NGSR - SY515 1 2027 Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (7) NAVY 2.1.2) SVSI - SY180 PROC QTY Item Number / Title [DODIC]: 1 / Aviation Life Support 2.873 .000 2.873 2.873 (8) 2 2025 NAVY 1.400 .000 1.400 2 2026 NAVY .296 .000 .296 .296 2 2027 NAVY .465 .000 .465 .465 2.1.3) IJHMCS - SY215 A - - - 1.400 (9) Prior Years Deliveries: 612 3 2025 NAVY .034 .000 .034 3 2027 NAVY .051 .000 .051 2.1.4) HPH - SY505 A - - - - .034 .051 (10) Prior Years Deliveries: 4828 4 2024 NAVY 1.900 .000 1.900 4 2025 NAVY 1.024 .000 1.024 A - - - - - - .159 .159 .159 .159 .159 .159 .159 .159 .160 .160 .308 A - - - - - - 1.024 4 2026 NAVY 3.000 .000 3.000 3.000 4 2027 NAVY 1.398 .000 1.398 1.398 5.000 2.1.5) AMHHP - SY510 Prior Years Deliveries: 24800 5 2024 NAVY 5.000 .000 5 2025 NAVY 33.000 .000 33.000 5.000 .000 5.000 A.416 .417 .416 .417 .416 .417 .417 .417 .417 .417 .416 .417 .000 A2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 .000 2.1.8) ISEA - SY143 6 2026 NAVY 5.000 3.1.1) Phys Mon - SY127 Prior Years Deliveries: 2075 7 2024 NAVY 1.785 .000 1.785 7 2025 NAVY .104 .000 .104 3.1.2) ASIP - SY126 A - - - - - - - - - - - - .146 1.639 A - .104 (12) Prior Years Deliveries: 7 8 2024 NAVY .001 .000 .001 8 2025 NAVY .001 .000 .001 8 2026 NAVY .001 .000 .001 8 2027 NAVY .001 .000 .001 A - .001 .000 A - - .001 .000 .001 .001 O C T LI 4268 - Aviation Support Equipment Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 26 S E P O C T N O V D E C J A N F E B P-1 Line #101 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 148 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) NGSR - SY515 1 2027 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R J U N J U L A U G S E P B A L A N C E 1.917 Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y (7) NAVY 2.1.2) SVSI - SY180 PROC QTY Item Number / Title [DODIC]: 1 / Aviation Life Support 2.873 .000 2.873 A - - - - - - .239 .239 .239 .239 .024 .025 .024 .025 .024 .025 .025 .025 .050 A - - - - - - - .465 .003 .003 .003 .002 .002 A - - - - (8) 2 2025 NAVY 1.400 .000 1.400 2 2026 NAVY .296 .000 .296 2 2027 NAVY .465 .000 .465 2.1.3) IJHMCS - SY215 - - - - .116 .117 .116 .117 .116 .117 .116 .117 .117 .117 .117 .117 A - - - - - - - - - .024 .025 .000 (9) Prior Years Deliveries: 612 3 2025 NAVY .034 .000 .034 3 2027 NAVY .051 .000 .051 2.1.4) HPH - SY505 - - - - - - - - - - .003 .003 .003 .003 .003 .003 .003 .000 .051 (10) Prior Years Deliveries: 4828 4 2024 NAVY 1.900 1.592 .308 .154 .154 4 2025 NAVY 1.024 .000 1.024 .086 .085 4 2026 NAVY 3.000 .000 3.000 4 2027 NAVY 1.398 .000 1.398 .000 .085 .086 .085 .085 .086 .085 .085 .086 .085 .085 A - - - - - - .250 .000 .250 .250 .250 .250 .250 .250 .250 .250 .250 .250 .250 A - - - - - - .000 .116 1.282 2.1.5) AMHHP - SY510 Prior Years Deliveries: 24800 5 2024 NAVY 5.000 5.000 .000 .000 5 2025 NAVY 33.000 33.000 .000 .000 5.000 .000 5.000 2.1.8) ISEA - SY143 6 2026 NAVY A - - - - - .416 .417 .416 .417 .416 .417 .416 .417 .417 .417 .417 .417 .000 3.1.1) Phys Mon - SY127 Prior Years Deliveries: 2075 7 2024 NAVY 1.785 .146 1.639 .149 .149 .149 .149 .149 .149 .149 .149 .149 .149 .149 7 2025 NAVY .104 .000 .104 - - - - - - - - - - - 3.1.2) ASIP - SY126 .000 .104 .000 (12) Prior Years Deliveries: 7 8 2024 NAVY .001 .001 .000 8 2025 NAVY .001 .001 .000 8 2026 NAVY .001 .000 .001 8 2027 NAVY .001 .000 .001 .000 .000 A - .001 .000 A - O C T LI 4268 - Aviation Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 26 S E P O C T N O V .001 D E C .000 J A N F E B P-1 Line #101 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 149 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE 1.1.1) NGSR - SY515 1 2027 Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N .239 .239 .239 .240 .240 .240 .240 .240 J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (7) NAVY 2.1.2) SVSI - SY180 PROC QTY Item Number / Title [DODIC]: 1 / Aviation Life Support 2.873 .956 1.917 .000 (8) 2 2025 NAVY 1.400 1.400 .000 2 2026 NAVY .296 .246 .050 .025 .025 2 2027 NAVY .465 .000 .465 - - .039 .039 .038 .039 .038 .039 .039 .039 .038 .039 .039 .039 - - - - - - - - - - .004 .004 .004 .004 2.1.3) IJHMCS - SY215 .000 .000 .000 (9) Prior Years Deliveries: 612 3 2025 NAVY .034 .034 .000 3 2027 NAVY .051 .000 .051 2.1.4) HPH - SY505 .000 .004 .004 .004 .004 .005 .005 .005 .004 .000 (10) Prior Years Deliveries: 4828 4 2024 NAVY 1.900 1.900 .000 .000 4 2025 NAVY 1.024 1.024 .000 .000 4 2026 NAVY 3.000 3.000 .000 4 2027 NAVY 1.398 .116 1.282 .000 .116 .116 .116 .116 .116 .117 .117 .117 .117 .117 .117 .000 2.1.5) AMHHP - SY510 Prior Years Deliveries: 24800 5 2024 NAVY 5.000 5.000 .000 .000 5 2025 NAVY 33.000 33.000 .000 .000 5.000 5.000 .000 .000 2.1.8) ISEA - SY143 6 2026 NAVY 3.1.1) Phys Mon - SY127 Prior Years Deliveries: 2075 7 2024 NAVY 1.785 1.785 .000 .000 7 2025 NAVY .104 .104 .000 .000 3.1.2) ASIP - SY126 (12) Prior Years Deliveries: 7 8 2024 NAVY .001 .001 .000 .000 8 2025 NAVY .001 .001 .000 .000 8 2026 NAVY .001 .001 .000 .000 8 2027 NAVY .001 .001 .000 .000 O C T LI 4268 - Aviation Support Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 26 S E P O C T N O V D E C J A N F E B P-1 Line #101 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 150 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC]: 1 / Aviation Life Support Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 General Dynamics - Falls Church, VA TBD 2 Peckham Vocational Industries - Lansing, MI TBD 3 Rockwell Collins - ESA Vision Systems - Dallas Ft. Worth, Texas 3 120 4 Creare - Hanover, NH 50 900 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 6 0 6 6 6 0 6 6 0 0 7 7 0 0 9 9 240 0 6 14 20 0 4 14 18 3,000 11 8 8 16 0 3 6 9 5 DLA - Philadelphia, PA TBD 0 0 0 0 0 0 0 0 6 TBD - TBD TBD 0 0 5 5 0 0 5 5 7 DLA Troop Support Philadelphia, PA TBD 0 0 12 12 0 0 12 12 8 VARIOUS - VARIOUS TBD 0 0 0 0 0 5 2 7 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 17 of 26 P-1 Line #101 Volume 3 - 151 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 17.372 17.577 17.019 0.000 17.019 - Gross/Weapon System Cost ($ in Millions) 118.326 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 118.326 Plus CY Advance Procurement ($ in Millions) - - - - - 17.372 17.577 17.019 0.000 17.019 - Total Obligation Authority ($ in Millions) 118.326 FY 2027 Total - - - - - 17.372 17.577 17.019 0.000 17.019 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) S6003 Aviation Maintenance Advancement Solution 3,769.27 12,768 48.126 3,924.91 3,356 13.172 4,004.12 3,399 13.610 4,083.06 3,116 12.723 - - 0.000 4,083.06 3,116 12.723 (†) 1.1.2) INACTIVE PROJECTS - - 49.846 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 97.972 - - 13.172 - - 13.610 - - 12.723 - - 0.000 - - 12.723 - - 97.972 - - 13.172 - - 13.610 - - 12.723 - - 0.000 - - 12.723 - - 20.354 - - 4.200 - - 3.967 - - 4.296 - - 0.000 - - 4.296 Subtotal: Support Production Cost - - 20.354 - - 4.200 - - 3.967 - - 4.296 - - 0.000 - - 4.296 Gross/Weapon System Cost - - 118.326 - - 17.372 - - 17.577 - - 17.019 - - 0.000 - - 17.019 Subtotal: Hardware Hardware Cost Support - Production Cost 2.1) S6840 Aviation Maintenance Advancement Solutions (17) Remarks: [Hardware] Quantities of PEMAs are derived from actual current inventory, as reported by the fleet in the mandated asset tracking system Support Equipment Management System (SEMS). This program is a replenishment of these fielded systems on a one for one basis as required. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 18 of 26 P-1 Line #101 Volume 3 - 152 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4268 / Aviation Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) MDAP/MAIS Code: indicates the presence of a P-5a Footnotes: (17) The FY 2027 increase is a Future Readiness Initiative Augmented Reality Maintenance System (ARMS) which supports digital transformation of maintenance assistance concepts of operations through implementation of augmented reality technology. This capability enables subject matter experts to provide remote maintenance support via tablet interfaces to field maintainers equipped with augmented reality headsets, enhancing operational readiness and reducing maintenance response times. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 19 of 26 P-1 Line #101 Volume 3 - 153 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements 1.1.1) S6003 Aviation Maintenance (†) Advancement Solution 1.1.1) S6003 Aviation Maintenance (†) Advancement Solution 1.1.1) S6003 Aviation Maintenance (†) Advancement Solution (†) O O C P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date FY Contractor and Location 2025 Panasonic of North America / Secaucus, NJ C / IDIQ NAWCAD LKE Jan 2025 Mar 2025 3,356 3,924.91 Y Oct 2024 2026 Panasonic of North America / Secaucus, NJ C / IDIQ NAWCAD LKE Dec 2025 Feb 2026 3,399 4,004.12 Y Oct 2025 2027 Panasonic of North America / Secaucus, NJ C / IDIQ NAWCAD LKE Dec 2026 Feb 2027 3,116 4,083.06 Y Oct 2026 (Each) indicates the presence of a P-21 LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 20 of 26 P-1 Line #101 Volume 3 - 154 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 339 339 339 339 339 339 339 339 687 F E B M A R A P R M A Y J U N J U L A U G S E P Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B Calendar Year 2026 M A R A P R M A Y J U N J U L A U G S E P O C T N O V 339 339 339 339 339 339 339 339 339 D E C J A N 1.1.1) S6003 Aviation Maintenance Advancement Solution Prior Years Deliveries: 12768 1 2025 NAVY 3,356 0 3,356 1 2026 NAVY 3,399 0 3,399 1 2027 NAVY 3,116 0 3,116 A - 305 0 A - - 3,116 O C T LI 4268 - Aviation Support Equipment Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 26 S E P O C T N O V D E C J A N P-1 Line #101 Volume 3 - 155 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V 339 348 D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) S6003 Aviation Maintenance Advancement Solution Prior Years Deliveries: 12768 1 2025 NAVY 3,356 3,356 0 1 2026 NAVY 3,399 2,712 687 1 2027 NAVY 3,116 0 3,116 0 O C T LI 4268 - Aviation Support Equipment Navy 0 A - N O V D E C J A N 312 312 312 312 312 312 311 311 311 311 F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V UNCLASSIFIED Page 22 of 26 0 D E C J A N F E B P-1 Line #101 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 156 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Item Number / Title [DODIC]: 2 / Aviation Maintenance Advancement Solutions (AMAS) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Panasonic of North America Secaucus, NJ MSR For 2027 1-8-5 For 2027 MAX For 2027 500 2,000 5,000 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 3 Total After Oct 1 2 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 23 of 26 P-1 Line #101 Volume 3 - 157 5 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4268 / Aviation Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / ALIS SHIP INSTALLATION MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 38.100 9.387 4.122 10.824 0.000 10.824 4.435 4.509 4.614 - - - - - - - - - 38.100 9.387 4.122 10.824 0.000 10.824 4.435 4.509 4.614 - - - - - - - - - 38.100 9.387 4.122 10.824 0.000 10.824 4.435 4.509 4.614 To FY 2031 Complete 4.708 Continuing - Continuing - 4.708 Continuing - Total - Continuing - - 4.708 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [ALIS - Program Support] Autonomic Logistics Information System (ALIS) Ship Integration - CVN, LHD, LHA: ALIS controls all aspects of F-35 mission planning, maintenance, logistics, and supply functions. Funding for ALIS Ship Integration efforts (Programmatic Support, Engineering Support Services, Material, and Installation efforts) will enable shipboard (CVN, LHD, LHA) modification, classified/unclassified network integration, the installation of ALIS-related shipboard equipment, ALIS security accreditation, and verification of ALIS operation and functionality to include the integration of ALIS with shipboard Command, Control, Communications and Computers & Intelligence (C4I) Networks and the Prognostic Health Management (PHM) downlink. At the completion of each installation, the respective ship's ALIS will enable the F-35 system to provide, at the appropriate security levels via Navy Local Area Networks (LANs)/Wide Area Networks (WANs), the ability to transfer time-sensitive data for logistics support, mission planning, mission execution, and mission debriefing. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 24 of 26 P-1 Line #101 Volume 3 - 158 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / ALIS SHIP INSTALLATION MDAP/MAIS Code: Models of Systems Affected: CVN, LHD, & LHA Prior Years Modification Type: Add Capability FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: ALIS SHIP INSTALLATION B Kits Recurring 1.1.1) Installation Material - NonOrganic 20 / 0.800 (18) Subtotal: Recurring - Subtotal: ALIS SHIP INSTALLATION / 0.800 2 / 0.080 - 20 / 0.800 Subtotal: Procurement, All Modification Items / 0.080 2 / 0.080 - 2 / 0.080 / 0.080 - 2 / 0.080 2 / 0.080 - / - / 0.080 - / - 2 / 0.080 2 / 0.080 - / - - / - - / 0.080 - / 0.080 - / 0.080 - / 0.080 - / 0.080 2 / 0.080 - 2 / 0.080 / 0.080 2 / 0.080 - 2 / 0.080 / 0.080 2 / 0.080 - 2 / 0.080 / 0.080 2 / 0.080 Continuing Continuing / 0.080 Continuing Continuing 2 / 0.080 Continuing Continuing - / 0.080 Continuing Continuing - 2 / 0.080 - / 0.800 - / 0.080 - / 0.080 - / 0.080 - / 7.650 - / 6.182 - / 0.894 - / 3.930 - / 0.000 - / 3.930 - / 0.889 - / 1.087 - / 1.077 - / 1.189 Continuing Continuing - / 7.556 - / 0.824 - / 0.833 - / 4.454 - / 0.000 - / 4.454 - / 1.086 - / 0.962 - / 1.187 - / 1.129 Continuing Continuing - / 15.206 - / 7.006 - / 1.727 - / 8.384 / - - / 8.384 - / 1.975 - / 2.049 - / 2.264 - / 2.318 Continuing Continuing Modification Item 1 of 1: ALIS SHIP INSTALLATION - / 22.094 - / 2.301 - / 2.315 - / 2.360 / 0.000 - / 2.360 - / 2.380 - / 2.380 - / 2.270 - / 2.310 - / 0.000 - / 38.410 Subtotal: Installation - / 22.094 - / 2.301 - / 2.315 - / 2.360 / - - / 2.360 - / 2.380 - / 2.380 - / 2.270 - / 2.310 - / 0.000 - / 38.410 4.708 Continuing Support (All Modification Items) 2.1) ALIS - Program Support (19) 2.2) ALIS - Production Engineering Support (20) Subtotal: Support - Installation - Total Total Cost (Procurement + Support + Installation) LI 4268 - Aviation Support Equipment Navy 38.100 9.387 4.122 10.824 0.000 UNCLASSIFIED Page 25 of 26 10.824 4.435 4.509 P-1 Line #101 4.614 Continuing Volume 3 - 159 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 4268 / Aviation Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / ALIS SHIP INSTALLATION MDAP/MAIS Code: Modification Item 1 of 1: ALIS SHIP INSTALLATION Manufacturer Information Manufacturer Name: NAWC AD 4.5.10 Manufacturer Location: St. Inigoes, NAS Patuxent River MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 FY 2031 Delivery Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Installation Information Method of Implementation: [none specified]:: Installation Name: Installation Material Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 20 / 22.094 FY 2025 20 / 22.094 - / - 2 / 2.301 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.301 FY 2026 - / - - / - 2 / 2.315 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.315 FY 2027 - / - - / - - / - 2 / 2.360 0 / 0.000 2 / 2.360 - / - - / - - / - - / - 0 / 0.000 2 / 2.360 FY 2028 - / - - / - - / - - / - - / - - / - 2 / 2.380 - / - - / - - / - 0 / 0.000 2 / 2.380 FY 2029 - / - - / - - / - - / - - / - - / - - / - 2 / 2.380 - / - - / - 0 / 0.000 2 / 2.380 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.270 - / - 0 / 0.000 2 / 2.270 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.310 0 / 0.000 2 / 2.310 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total 20 / 22.094 2 / 2.301 2 / 2.315 2 / 2.360 0 / 0.000 2 / 2.360 2 / 2.380 2 / 2.380 2 / 2.270 / - 2 / 2.310 / - - 0 / 0.000 / - 34 / 38.410 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 20 - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - 34 Out 20 - - - - - - - - - - - - - - - 34 - 2 - 2 - 2 - 2 - 2 - 2 - 2 Footnotes: (18) (19) FY 2027 Installation Material requested funding supports Design Support Activities (DSA) to include material purchases for the installation of two (2) ALIS in FY 2027. FY 2027 Program Support requested funding supports Design Support Activities (DSA) to include Alteration Installation Team support for the installation of two (2) ALIS in FY 2027. The increase from FY 2026 to FY 2027 is due to the urgent need for additional work on CVN 77 (USS George H.W. Bush), resulting from a schedule shift. (20) The increase from FY 2026 to FY 2027 is due to the urgent need for additional work on CVN 77 (USS George H.W. Bush), resulting from a schedule shift. LI 4268 - Aviation Support Equipment Navy UNCLASSIFIED Page 26 of 26 P-1 Line #101 Volume 3 - 160 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 421.221 421.221 421.221 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 119.561 119.561 119.561 186.909 186.909 186.909 211.216 - 0.000 - 211.216 - 0.000 - 211.216 0.000 211.216 211.216 211.216 219.608 219.608 219.608 246.704 246.704 246.704 229.575 229.575 229.575 To FY 2031 Complete 210.126 Continuing 210.126 Total - Continuing Continuing - Continuing - - Continuing Continuing 8.838 Continuing Continuing 210.126 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.977 - 10.004 - 10.004 11.216 5.756 4.423 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This Budget Line Item funds The Unmanned Carrier Aviation (UCA) Mission Control System (UMCS) program. This program builds, integrates, installs, and sustains the systems (control station, communications, and networks) required to operate the MQ-25, Collaborative Combat Aircraft (CCA) and future unmanned systems, which comprises the Air Wing of the Future (AWOTF), afloat and ashore. The UMCS program is the system-of-systems required for MQ-25 vehicle and payload control, both shipboard and shore based. The UMCS consists of all ground and ship-based hardware, software, and networks associated with the planning and execution of flight operations and tactical missions, including the control stations (displays, computers, and servers), line-of-sight communications, and beyond lineof-sight satellite communications. The ground control station (GCS), designated as the MD-5, allows pilots to command and control the MQ-25 Air Vehicle using external Command, Control, Communication, Computers, and Intelligence (C4I) systems. The main component of the GCS is the Multi Domain Combat System (MDCX), which will support multiple classification levels, control of multiple unmanned aircraft, and improve MQ-25 interoperability with other DoW systems. UMCS modifies approximately 12 -15 spaces on the aircraft carrier (CVN), using the Ship Change Document (SCD) process, to install the GCS and ancillary systems needed for communications, video management, and integration with existing CVN networks. The NAVWAR C4I systems provide the CVN network paths for air vehicle and mission payload data using a variety of wideband and narrowband communication paths. UMCS modifies and integrates with Launch and Recovery systems on both NIMITZ and FORD class CVNs: Aircraft Launch and Recovery Equipment (ALRE) and Joint Precision Approach Landing Systems (JPALS). Through the Software Support Activity (SSA), UMCS maintains software for the GCS and ancillary systems and verifies integration with MQ-25 Air Vehicle unique software. The GCS has three variants: fixed shore (MD-5D), CVN (MD-5C), and mobile (MD-5E, Embarkable - RDT&E funded). The fixed shore and CVN variants will be permanent installations to support MQ-25 operations. The GCS consists of the following components: Air Vehicle Pilot (AVP) workstations, server racks, network interface racks, integrated communication system (ICS), and software. The CVN variant leverages shore system components but differs slightly to account for the rugged CVN environment. The UMCS ancillary systems provide the necessary communication, data, and network integration paths that allow MQ-25 pilots to control the MQ-25 and exchange data with CVN systems. MQ-25 pilots receive situational awareness data from two sources: the Video Management System (VidMS) and Air Traffic Control (ATC) picture. The Unmanned Carrier Aviation Transport System (UTS), used both afloat and ashore, integrates operational networks to provide narrowband and wideband communications and it contains the Data Transfer System (DTS) which allows the mission plan to be loaded on the MQ-25. Narrowband communications are provided by the ARC-210 Radio Communication System (RCS) and the Digital Modular Radio (DMR), which is used to access the Mobile User Objective System (MUOS). Each of these systems have afloat and ashore variants. The ARC-210 Radio Communication System ship system has an additional equipment rack to integrate with antennas located on the mast. The Integrated communication system half-rack, only installed on CVNs, is the interface between the GCS and Shipboard Air Traffic Control Communications (SATCC) systems allowing MQ-25 pilots access to existing ship radios. There are several ancillary systems that only have shore variants. The Shore Common Data Link (CDL) provides wideband line of sight command and control and data communications between the GCS and the MQ-25. The Ashore Routing Communication System (ARCS) is the interface between the Unmanned Carrier Aviation Transport System and the C4I wideband communication data networks. The ARC-210 Voice Communication System is a set of radios for communication between the GCS and flight LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 1 of 19 P-1 Line #102 Volume 3 - 161 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A line personnel. UMCS leads the modification, engineering, and integration activities with NAVWAR C4I baseline systems. NAVWAR C4I is integrating the following baseline Program of Record systems to support MQ-25 operations: Consolidated Afloat Networks and Enterprise Services (CANES), Automated Digital Network System (ADNS), Shore Tactical Assured Command and Control (STACC), Network Tactical Common Data Link (NTCDL), CVN MUOS DMR (AN/SRC-61A(V)18 & AN/SRC-61A(V)19), Shore MUOS DMR (AN/FRC-147A(V)5), Classic Reach, Distributed Common Ground System-Navy (DCGS-N), Global Command and Control System-Maritime (GCCS-M), Automatic Identification System (AIS) & Naval Integrated Tactical Environment System-Next (NITES-Next). UMCS performs CVN infrastructure modifications and hardware installations on twelve (12) NIMITZ and FORD Class carriers and three (3) operational shore locations. Currently there are seven (7) workstations planned for each NIMITZ class carrier and nine (9) workstations per GCS planned for each FORD class carrier. The CONUS shore sites have two (2) GCSs each while the OCONUS site has one (1) GCS. There are nine (9) workstations planned for both the CONUS and OCONUS sites. All CVN Modification Planning and Integration activities follow the NAVSEA Navy Modernization Process (NMP) which identifies specific schedules for documentation, drawing, and hardware deliveries. CVN installations are conducted serially across multiple ship maintenance availability periods. The Navy Modernization Process can be divided into four phases. Phase 1 (three years prior to an availability period) is the CVN system planning and design phase that includes generation of technical data and top-level drawings as well as some longlead procurement. Phase 2 (two years prior to an availability period) focuses on specific CVN hulls that includes ship checks, generation of drawings, and GCS/ancillary system procurement. Phase 3 (one-year prior to the availability period) is the final approval for design, drawings, schedule, and documentation. Phase 4 is the actual CVN Installation and Shipyard Services process that occurs during an availability period. A minimum of two six-month availability periods are required to complete modifications and installations. Phases 1, 2, and 3 repeat for each availability period. Therefore, it is possible that UMCS can be installing hardware and planning for future installation work on the same CVN or multiple CVNs in any given fiscal year. Modifications and installations are subject to change based on ship availability schedule updates. CVN Modification Planning and Integration requires extensive stakeholder coordination by a program to perform carrier modifications following NAVSEA processes and requirements for integration into a CVN Maintenance Availability (Avail) work package. Programs are responsible to prepare the technical documentation and detailed guidance information for each ship that will be modified per the Ship Change Documents so that Ship Installation Drawings (SIDs) can be produced. This process typically takes over a year, due to the complexity of modifications. The Unmanned Air Warfare Center (UAWC) Ship Change Documents are characterized by NAVSEA as complex since these impact several compartments, cooling, power and network/circuits on the ship. UMCS uses government and contractor resources to prepare the Ship Change Documents and supporting guidance packages across all hulls for both NIMITZ and FORD Class carriers. These resources also manage the communications and administrative paperwork levied on a Program by the Navy Modernization Process leading up to, during and after the ship installation. Guidance packages contain detailed design and interface specifications for the equipment, UAWC arrangement drawings for placement of hardware in the control room, schematics for cabling details, supporting details and analyses to address physical security, cyber design details, RF spectrum studies for topside antennas, and suitability provisions for the shipboard environment. CVN Installation and Shipyard Services involve the physical modifications to the ship. These services are the implementation of the CVN Modification Planning and Integration processes and are significant in scope and cost. The Planning Yard produces Ship Installation Drawings and a Shipyard approved work package with a detailed installation schedule. These installations are aligned with the Avail schedule to minimize impact to key events & milestones so that the ship exits the Avail on time. Contractor Alteration Installation Teams (AITs) perform the industrial work and hardware installation. AITs and their subcontractors must be approved by the Shipyard. Scheduling AITs are done well in advance of the Maintenance Avail, mostly due to the lengthy contracting process and for them to receive approved Ship Installation Drawings to plan the installation work, procure raw materials and align subcontractors. Following the approval of the Ship Change Documents and Ship Installation Drawings, industrial work can proceed during the aligned Avail. Industrial work includes setting up shipyard services (e.g. scaffolding, ventilation, air/electric for tools, storage containers on the pier, material handling/cranes), removal of old paint and hazardous coatings/materials, cutting/grinding of metal, welding structural members, foundations and fixtures, installation of electrical and network cabling, priming and painting, installation of thermal & acoustic insulation, fabrication and installation of ventilation ducting, modification/ increasing the size of cooling fans and coils, and the application of flooring. Once the industrial work has been completed, any hardware to be installed is brought aboard. If the hardware is of small enough size, it will be brought onboard the ship through the existing hatches. However, larger equipment, such as the fan room modifications, will need to have special holes cut in the deck to allow installation. The fully populated racks of the GCS require careful rigging to get the hardware through passageways and hatches into the space. Once these difficulties are overcome, hardware installation ensues, with cabling and other electrical/mechanical tasks going through various quality checks ultimately leading to a final System Operational Verification Test (SOVT). LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 2 of 19 P-1 Line #102 Volume 3 - 162 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 421.221 - / 119.561 - / 186.909 - / 211.216 - / 0.000 - / 211.216 - / 421.221 - / 119.561 - / 186.909 - / 211.216 - / 0.000 - / 211.216 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 budget increases by $24.307M from FY26 to FY27 due to additional funding for MDCX product Support, UMCS Integration of Ford Class Advanced Arresting Gear (AAG) and Electromagnetic Aircraft Launch System, Obsolescence Engineering, Integration of Deferred Supportability Requirements and C4I integration. This funding will be used for nonrecurring engineering to perform engineering change proposals to correct deficiencies or address obsolescence issues and will provide essential OEM support for installation and initial system operations. This investment is necessary to ensure the continued reliability and modernization of the GCS. In FY2027 UMCS will fund the following: CVN B - Prepare for installation of the UAWC Fan Room modification and Final Deployment Configuration (FDC) modification in the FY28 Docking Planned Incremental Availability (DPIA). - Prepare for installation of MQ25 work centers and ready room installation during FY28 DPIA. - Procure tech refresh equipment for installation during the FY28 DPIA. CVN C - Commence MQ25 work centers and ready room installation during FY27 Planned Incremental Availability (PIA). - Procure MD-5C variant AVP consoles for installation during FY27 PIA. - Remove temporary AVP consoles and replace with MQ-5C variant, shock-qualified consoles to support second CVN test. - Commence ADMACS ECP installation during FY27 PIA. - Support post installation discrepancies to perform C4I operational network evaluations. - Procure tech refresh equipment and install during the FY27 PIA. - Procure long lead material to support Phase 1 of the Navy Modernization Process to support installation during the FY30 DPIA. CVN D - Procure Block 2 hardware upgrade kit, comprising the Final Deployment Configuration (FDC), for installation during the FY29 Planned Incremental Availability (PIA), to support AWOTF. - Continue installation of the MD-5C and MQ25 work centers and ready room that began in the FY26 DPIA. - Continue installation of ADMACS ECP that began in the FY26 DPIA. - Procure tech refresh equipment for installation during FY29 PIA. CVN E - Commence FY27 Initial Deployment Configuration (IDC) Increment 2 Installation. This configuration capitalizes on work performed in prior years when MD-5A was planned and is an evolutionary step to enable Deployment of MQ-25. LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 3 of 19 P-1 Line #102 Volume 3 - 163 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A - Prepare for the FY28 Initial Deployment Configuration-Increment 3. Only the necessary/limited set of hardware will be installed for Deployment. The Unmanned Air Warfare Center will be configured to the Final Deployment Configuration during a future Maintenance Avail that has sufficient duration to accommodate all necessary major industrial work. - Procure ICS ship 1/2 rack for installation during FY28 System Requirements Analysis (SRA). - Procure tech refresh equipment for installation during FY28 SRA. CVN F - Procure long lead material to support Phase 1 of the Navy Modernization Process to support installation during the FY30 PIA. CVN G - Procure MUOS Digital Modular Radio (DMR) Communication System for installation during the FY30 PIA. This system consists of long lead components. CVN J - Support MQ25 first CVN test planned for Q3 FY28. This support includes government and contractor personnel to support the testing, operations, and maintenance in support of the 2 at sea test events in FY27. - Support post installation activities to perform MQ25 first CVN flight and first deployment. This support includes government and contractor personnel to support carrier installation follow-on activities. - Procure tech refresh equipment for installation during the FY28 Carrier Incremental Availability (CIA). CVN K - Commence planning and generation of technical data and top-level drawings in support of ship checks, and detailed drawings to support upcoming installation in FY29 DPIA. CONUS West Operational Shore Location - Support MQ25 first CVN flight planned for Q3 FY28 using the Embarkable system. - Prepare and plan for installation of the MD5-D in the FY28 post construction. CONUS East Shore Location - Procure 1 MD-5D, to include both MQ-25 and AWOTF configuration, for installation in FY29. - Procure 1 VidMS for installation in FY29. - Procure 2 Common Data Link Systems for installation in FY29. - Procure 1 Ashore Routing Communication System (ARCS) for installation in FY29. - Procure 1 ARC-210 Radio Communication System (RCS) Shore for installation in FY29. - Procure 1 ARC-210 Shore Voice Communication System for installation in FY29. - Procure 1 UTS for installation in FY29. - Procure 1 Ancillary kit for installation in FY29 - Prepare and plan for installations occurring in FY29. In FY2027, UMCS will fund the following support tasking: - Revise GCS and ancillary system guidance documentation (top-level drawings and installation instructions) as needed for the CONUS West Shore location. - Continue maturing GCS and ancillary system guidance documentation for the CONUS East and Forward Deployed Naval Forces (FDNF) locations. - Continue preparing GCS installation guidance documents for all FORD Class carriers: all CVNs. These documents allow NAVSEA to generate the Ship Installation Drawings (SIDs). Modification work will either be funded with OPN (CVN K) in FY29 - FY32 and planned installation work on in-service CVNs G and K (OPN funded) and during new Ship construction of CVNs H and I (SCN funded). - Continue preparing and updating guidance documents for NIMITZ Class installations; CVNs B, C, D, E, I, and J. Work is required to generate Ship Installation Drawings for the growth configuration planned for the Unmanned Air Warfare Center (UAWC). On CVNs where installation work had been performed to the MD-5A layout, additional guidance is needed to remove and reconfigure the UAWC. - Continue modifying ALRE systems for future installation on FORD Class carriers. This work is necessary for MQ-25 to operate from FORD Class CVNs. LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 4 of 19 P-1 Line #102 Volume 3 - 164 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 03: Aviation Support Equipment / BSA 3: Aircraft Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A - Complete Video Management System nonrecurring engineering to support engineering change proposal due to component End of Life (EOL). - Continue GCS hardening modifications, complete final testing Electromagnetic Interference (EMI), shock, and vibration testing, and implement modifications. - Address obsolescence issues across the MD-5C and MD-5D systems including resolution of outstanding deferred and reliability and maintainability (R&M) requirements for the MD-5 system. - Continue implementing the UMCS Software Support Activity to provide ongoing technology insertion and modernization for all fielded MD-5 GCS software. Procure and manage essential licenses for software required to operate MD-5. This ensures operational viability and mitigates obsolescence by upgrading the software baseline. - Continue creating technical manuals and Operator/Maintenance Training documentation for the GCS. - Complete integration efforts between the GCS and communication/ancillary systems. - Update technical data, software, and logistics documentation to support GCS operations and maintenance. - Continue C4I support to facility and GCS design to support integration with operational communication systems and networks at the three (3) shore locations. - Update Automated Digital Network System (ADNS) and other C4I systems to support integration with the new GCS and MQ-25 operations. - Continue maturing the shore-based network architecture to support wideband beyond line of sight (BLOS) communications using Starlink to enhance and modernize critical communication systems and network operations on CVNs and at all CONUS/OCONUS shore sites, essential to support MQ-25 deployment schedules as outlined in the Master Aviation Plan. - Continue modification, integration, and test with externally managed C4I systems to support MQ-25 operations. - Provide continued sustainment for the ARC-210 Radio Communication System. - Continue ADMACS integration with the MD-5C ECP development and installations. - Initiate Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) integration with MD-5C ECPs on FORD Class CVNs. - Address obsolescence to include engineering change proposals for retrofits and forward fit - this includes form-fit-function replacements, qualification of new parts and life-of-type buys. - Production engineering to support all fielded systems, ensuring that deployed assets remain fully operational, secure, and effective throughout their lifecycle. - Nonrecurring engineering for engineering change proposal for ARCS due to obsolescence, EOL components and modernization to meet cyber security requirements. While individual hardware items are fully funded, procurement is based on lead-times and when that system is installed in the CVN or Shore location. LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 5 of 19 P-1 Line #102 Volume 3 - 165 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 421.221 Less PY Advance Procurement ($ in Millions) 119.561 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 211.216 - 0.000 - 186.909 211.216 - 211.216 - 119.561 FY 2027 Total 0.000 - 186.909 - 421.221 - - 119.561 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 186.909 - 421.221 FY 2027 Base - 211.216 - - 211.216 0.000 211.216 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.834 - 7.778 - 7.778 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) MD-5C CVN (†) Based GCS-Block I (1) 1.1.2) MD-5C CVN Based GCS Block I (2) Upgrade to Block II 5,335K - 3 - 16.006 - - - - - - - - - - - - - - 20.000 - - - 5,306K - - - - - - - 13,384K - - - - - - - 11.363 - - - - - - - 1 13.384 - - - 13,384K 1 13.384 398,167.00 1 0.398 - - - 398,167.00 1 0.398 1 1.186 - - - 1,186K 1 1.186 - - - - - 11,363K 1 - - 11,363K - 1 11.363 1.1.4) MD-5D Shore (†) Based GCS-Block I (3) 1.1.6) MD-5D Shore Based GCS Block II (4) 1.1.7) Integrated Communication System (ICS) Ship 1/2 Rack 5,000K - 4 - 1 5.306 - 366,000.00 4 1.464 - - - - 1,074K 8 8.592 - - - 1,163K 1 1.163 1,186K 2,473K 6 14.836 - - - 2,725K 1 2.725 - - - - - (†) (5) 1.1.8) Video Management System (†) (VidMS) 1.1.9) ARC-210 Radio Communication System (RCS) Ship (†) - - - (6) LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 6 of 19 P-1 Line #102 Volume 3 - 166 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 1.1.10) MUOS Digital Modular Radio (DMR) Communication Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) 424,000.00 8 3.392 1,240K 4 4.960 - 324,750.00 4 1.299 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 535,500.00 1 ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.536 - - - 557,000.00 1 0.557 - - - 557,000.00 1 0.557 - - - - - 1,343K 2 2.686 - - - 1,343K 2 2.686 - - - 348,173.00 1 0.348 - - - 348,173.00 1 0.348 3.811 - - 1.978 - 11.321 - - - - - - 1,252K 1.277 - - - 1,277K 1.871 1,908K (†) (7) System Ship 1.1.11) Shore Common Data Link (†) (8) (CDL) 1.1.12) Ashore Routing Communication 343,000.00 1 0.343 (†) System (ARCS) 1.1.13) Tech Refresh (9) 1.1.14) ARC-210 Radio Communication System (RCS) - - - 16.341 - - 1 1.252 1,277K 1 1.908 - - - - - - - - - - - - - - - - - - - 1.183 - - - 1,183K - - - - - 1 - 11.321 805,000.00 4 3.220 - 1 1.277 1,372K 2 2.743 1,871K 305,750.00 4 1.223 - - - - 642,428.57 7 4.497 - - - 1,160K 1 1.160 1,183K 85,000.00 3 0.255 0.088 70,000.00 1 0.070 - 635,000.00 3 1.905 - - - 1,945K 1 1.945 1,983K 1 1.983 - - - 1,983K 1 1.983 123,500.00 2 0.247 - - - 200,000.00 1 0.200 204,000.00 1 0.204 - - - 204,000.00 1 0.204 (†) Shore 1.1.15) MUOS Digital Modular Radio (DMR) Communication 1 (†) (10) System Shore 1.1.16) Data Transfer (†) System (DTS) - 1 1.1.17) UCA Transport System (UTS) (†) 1.1.18) Air Traffic Control (ATC) Picture (†) (11) (UYY-1) 1.1.19) ARC-210 Shore Voice Communication System 88,326.00 1 - 1 - 1 - 1.183 - (†) 1.1.20) Ancillaries (Shore Only) (†) Subtotal: Recurring Cost - - 88.450 - - 4.473 - - 32.413 - - 45.890 - - - - - 45.890 - - 72.326 - - 47.393 - - 48.596 - - 37.913 - - - - - 37.913 Non Recurring Cost 1.2.1) Aircraft Carrier Nuclear (CVN) LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 7 of 19 P-1 Line #102 Volume 3 - 167 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements Installation and Shipyard Services ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (12) 1.2.2) Launch and (13) - - 20.285 - - 6.418 - - 4.756 - - 6.971 - - - - - 6.971 1.2.3) C4I Integration - - 45.842 - - 17.348 - - 16.670 - - 16.970 - - - - - 16.970 1.2.4) Aircraft Carrier, Nuclear (CVN) Modification, Planning - - 18.105 - - 4.342 - - 10.735 - - 10.212 - - - - - 10.212 - - 54.105 - - 15.073 - - 26.321 - - 26.847 - - - - - 26.847 - - 14.760 - - 5.375 - - 6.438 - - 9.294 - - - - - 9.294 - - 54.623 - - 8.100 - - 19.298 - - 32.873 - - - - - 32.873 - - 280.046 - - 104.049 - - 132.814 - - 141.080 - - - - - 141.080 - - 368.496 - - 108.522 - - 165.227 - - 186.970 - - - - - 186.970 - - 15.701 - - 3.790 - - 6.267 - - 8.216 - - - - - 8.216 - - 15.701 - - 3.790 - - 6.267 - - 8.216 - - - - - 8.216 - - 15.701 - - 3.790 - - 6.267 - - 8.216 - - - - - 8.216 - - 17.004 - - 3.561 - - 7.135 - - 7.584 - - - - - 7.584 3.2) Integrated Logistics Support (ILS) - - 20.020 - - 3.688 - - 8.280 - - 8.446 - - - - - 8.446 Subtotal: Support - Support Cost - - 37.024 - - 7.249 - - 15.415 - - 16.030 - - - - - 16.030 Gross/Weapon System Cost - - 421.221 - - 119.561 - - 186.909 - - 211.216 - - 0.000 - - 211.216 Recovery and Integration (14) 1.2.5) Product Support and Assembly 1.2.6) Shore Integration (15) 1.2.7) Ground Control Station (GCS) (16) Subtotal: Non Recurring Cost Subtotal: Hardware Hardware Cost Software - Software Cost Recurring Cost 2.1.1) Software (17) Subtotal: Recurring Cost Subtotal: Software Software Cost Support - Support Cost 3.1) Production Engineering Support (PES) (†) (18) indicates the presence of a P-5a LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 8 of 19 P-1 Line #102 Volume 3 - 168 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn MDAP/MAIS Code: Footnotes: (1) Beginning in FY2027, CE 1.1.1 will transition to CE 1.1.2 and 1.1.3, in order to more appropriately define the CVN based Ground Control Station (GCS) procurements. CE 1.1.1 is the original MD-5C CVN Based Design, designated the Block I configuration, intended for command and control of the MQ-25 Air System. (2) CE 1.1.2 MD-5C CVN Based GCS Block I Upgrade to Block II: This new cost element is required to differentiate Multi Domain Combat System (MDCX) configuration procurements. This cost element is to fund the procurement of additional equipment required to upgrade CVN B from a Block I configuration, MQ-25 command & control (C2) only, to a Block II configuration (C2 for Air Wing of the Future (AWOTF)). This new cost element has been broken out from CE 1.1.13 Tech Refresh. (3) Beginning in FY2027, Cost Element 1.1.4 will transition to Cost Elements 1.1.5 and 1.1.6, in order to more appropriately define the CVN based GCS procurements. CE 1.1.4 is the original MD-5D Shore Based Design, designated the Block I configuration, intended for command and control of the MQ-25 Air System. (4) CE 1.1.6 MD-5D Shore Based GCS Block II: Procures MD-5D Shore Based GCS with MQ-25 and AWOTF capability. FY27 procures 1 GCS for Norfolk Core 1 to be installed in FY29. FY26 unit cost (captured in Cost Element 1.1.4) included MQ-25 only, FY27 unit cost (now captured under 1.1.6) adds 12 AWOTF racks in addition to MQ-25 capability. (5) CE 1.1.7 Integrated Communication System (ICS) Ship -1/2 Rack: Procures ICS Ship 1/2 Rack. Increase from FY26 to FY27 since there was no requirement to procure in FY26. FY27 procurement for CVN E for installation during FY28 SRA. (6) (7) CE 1.1.9 ARC-210 Radio Communication System (RCS) Ship: Decrease from FY26 to FY27 due to the fact there is no requirement to procure hardware in FY27. CE 1.1.10 MUOS Digital Modular Radio (DMR) Communication System Ship: Increase from FY26 to FY27 due to the fact that there was no requirement to procure hardware in FY26. FY27 procurement is for CVN G to be installed in the FY30 PIA. MUOS DMR System has a greater than 2 years lead time. (8) (9) CE 1.1.11 Shore Common Data Link (CDL): Increase from FY26 to FY27 due to the requirement to procure 2 CDL systems for CONUS East to be installed during FY29 Avail. C.E 1.1.13 Tech Refresh: The decrease in funding is due to new cost elements that were added to differentiate MDCX Block 1 and Block 2 procurements. The Block 2 hardware required to retrofit a Block 1 configured CVN was in this cost element in previous years. The CE now only funds tech refreshes such as obsolescence/end of life (EOL) for the MD-5C and MD-5D which includes Lockheed Martin MDCX and the ancillary systems. This targeted sustainment involves essential technology refreshes to replace aging components, enhance operational reliability, and fortify the cybersecurity posture of these previously fielded systems, ensuring their long-term viability. (10) (11) (12) CE 1.1.15 MUOS Digital Modular Radio (DMR) Communication System Shore: Funds decrease from FY26 to FY27 due to the fact there is no requirement to procure hardware in FY27. CE 1.1.18 Air Traffic Control (ATC) Picture (UYY-1): Decrease from FY26 to FY27 due to the fact there is no requirement to procure hardware in FY27. CE 1.2.1 Aircraft Carrier Nuclear (CVN) Installation and Shipyard Services: The decrease from FY26 to FY27 is due to a decrease in the number of CVNs undergoing installation in FY27 compared to FY26. The allocated funds in FY27 are designated to complete the full system installation. FY27 funding addresses a prior strategic reallocation where CVN C's original FY25 installation funds were redirected to accelerate and self-fund modernization efforts on CVNs D and J. The current allocation ensures the completion of the originally planned UMCS installation on CVN C, bringing its systems to the required modern standard. (13) CE 1.2.2 Launch and Recovery: Increase is due to ECP 579 installation aboard CVN C and completion of installation on CVN D. Funds completion of phase two of ADMACS integration with MD-5C and commences final phase three of ADMACS integration with MD-5C. Funds crosscheck to initiate ADMACS ECP into UAWC on FORD class. Funds FORD Class Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) ECPs for software upgrades necessary to launch and recover MQ-25 with MD-5C. (14) (15) CE 1.2.4 Aircraft Carrier, Nuclear (CVN) Modification, Planning, and Integration: Decreases in FY27 due to the reduction in planning required for CVN installations in FY27. CE 1.2.6 Shore Integration: Funds increase from FY26 to FY27 due to planning of installations planned to take place in CONUS West Operational Shore location in FY28 and CONUS East Operational Shore location in FY29. The shore integration process entails planning, preparation of installation packages, completion and approval of Fleet Readiness Certification Board (FRCB) to support connection to operational networks, which includes test reports, cyber documentation and drawings. Funds also support development of integration methodologies, logistical coordination and compliance with safety protocols. Equipment integration, validation and analysis to ensure operational readiness. (16) CE 1.2.7 Ground Control Station (GCS): Funds increase in FY27 to accommodate necessary nonrecurring costs that include System Administrator and Information Systems Technician support (Field Service Reps) to support and maintain the CVN system being used for test and support the first overseas deployment in addition to engineering change proposals and engineering change orders, addressing end-of-life LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 9 of 19 P-1 Line #102 Volume 3 - 169 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn MDAP/MAIS Code: and obsolescence issues, as well as modifications required to resolve integration challenges, not limited to: operating environment, uncertainty of extreme carrier environments, and the continuous shock and vibration that impact system design along with multiple systems currently fielded and in use. The increase also supports integration abilities that enhance carrier-based systems to improve operations and reduce equipment burden on the carrier. Funds also include field tech support for CVN operations which increase in FY27. (17) CE 2.1.1 Software: Funds increase from FY26 to FY27 due to rising software costs associated with deploying additional systems. This includes expenses for multiple fielded systems, increased maintenance and support needs, labor, infrastructure, software licenses, training, compliance and system integration. (18) CE 3.1 FY26 to FY27 increases due to the additional personnel required to manage the design, configuration, installation, and other associated tasks for the production control stations. It also represents a transition of personnel from Research, Development, Test, and Evaluation (RDT&E) funding. The personnel transition is due to a decrease in the RDT&E phase due to UMCS maturity beyond that phase and moving to the production and fielding phase of the program. This Cost Element increases to address obsolescence needs across systems for ship and shore. LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 10 of 19 P-1 Line #102 Volume 3 - 170 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 FY Contractor and Location 2023 NSMA / Washington DC C / TBD ** NO PCO ** Mar 2023 Jul 2024 2 5,300K N 2024 NSMA / Washington DC C / TBD ** NO PCO ** Oct 2023 Feb 2025 1 5,406K N 2023 NSMA / Washington, DC C / TBD ** NO PCO ** Mar 2023 Sep 2024 4 5,000K N 2026 NSMA / Washington, DC C / TBD ** NO PCO ** Jul 2026 Oct 2027 1 5,306K N 1.1.7) Integrated Communication System (ICS) Ship - 1/2 Rack 2022 Frequentis USA / Columbia, MD SS / FFP Lakehurst, NJ Oct 2021 Oct 2022 2 360,488.00 Y Jun 2018 1.1.7) Integrated Communication System (ICS) Ship - 1/2 Rack 2023 Frequentis USA / Columbia, MD C / TBD Lakehurst, NJ Jan 2023 Jan 2024 1 367,845.00 N Aug 2022 1.1.7) Integrated Communication System (ICS) Ship - 1/2 Rack 2024 Frequentis USA / Columbia, MD C / TBD ** NO PCO ** Oct 2023 Oct 2024 1 375,202.00 N 1.1.8) Video Management System (VidMS) 2020 General Dynamics Information Technology / Falls Church, VA C / CPAF Pax River, MD Jan 2020 Jan 2021 1 854,200.00 Y Sep 2018 1.1.8) Video Management System (VidMS) 2023 General Dynamics Information Technology / Falls Church, VA C / CPAF Pax River, MD Jan 2023 Apr 2024 4 1,096K Y Sep 2018 1.1.8) Video Management System (VidMS) 2024 General Dynamics Information Technology / Falls Church, VA C / CPAF Pax River, MD Apr 2024 Jul 2025 3 1,118K N Sep 2018 1.1.1) MD-5C CVN Based GCSBlock I (†) 1.1.1) MD-5C CVN Based GCSBlock I (†) 1.1.4) MD-5D Shore Based GCSBlock I (†) 1.1.4) MD-5D Shore Based GCSBlock I (†) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1.1.9) ARC-210 Radio Communication System (RCS) Ship 2020 (19) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Nov 2019 Nov 2023 2 2,373K Y Sep 2018 1.1.9) ARC-210 Radio Communication System (RCS) Ship 2021 (20) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Oct 2020 Oct 2024 1 2,424K Y Sep 2018 1.1.9) ARC-210 Radio Communication System (RCS) Ship 2023 (21) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Oct 2022 Oct 2026 1 2,522K Y Sep 2018 1.1.9) ARC-210 Radio Communication System (RCS) Ship 2024 (22) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Jan 2024 Jan 2028 2 2,572K Y Sep 2018 1.1.9) ARC-210 Radio Communication System (RCS) Ship 2026 (23) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Jan 2026 Jan 2030 1 2,725K Y Sep 2018 1.1.10) MUOS Digital Modular Radio (DMR) Communication System Ship 2020 (24) NAWC WOLF / NAWCAD Patuxent RIver, MD Reqn Pax River, MD Oct 2019 Feb 2023 2 403,760.00 Y Sep 2018 1.1.10) MUOS Digital Modular Radio (DMR) Communication System Ship 2021 (25) NAWC WOLF / NAWCAD Patuxent RIver, MD Reqn Pax River, MD Oct 2020 Feb 2024 5 411,814.00 Y Sep 2018 LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 11 of 19 P-1 Line #102 Volume 3 - 171 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Location of PCO Award Date Date of First Delivery Reqn Pax River, MD Dec 2023 Apr 2027 NAWC WOLF / NAWCAD Patuxent RIver, MD Reqn Pax River, MD Dec 2024 2023 CUBIC / CALIFORNIA C / TBD ** NO PCO ** 1.1.12) Ashore Routing Communication System (ARCS) 2023 General Dynamics / Falls Church, VA C / TBD 1.1.12) Ashore Routing Communication System (ARCS) 2024 General Dynamics / Falls Church, VA 1.1.12) Ashore Routing Communication System (ARCS) 2026 Cost Elements 1.1.10) MUOS Digital Modular Radio (DMR) Communication System Ship 1.1.10) MUOS Digital Modular Radio (DMR) Communication System Ship 1.1.11) Shore Common Data Link (CDL) (†) O O C P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Method/Type or Funding Vehicle NAWC WOLF / NAWCAD Patuxent RIver, MD 2025 FY 2024 (26) Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 1 525,000.00 N Sep 2018 Apr 2028 1 535,500.00 N Sep 2018 Jun 2023 Aug 2024 4 1,240K Y Jan 2023 Pax River, MD Mar 2023 Mar 2024 2 321,658.00 N Nov 2022 C / TBD Pax River, MD Jul 2024 Jul 2025 2 328,091.00 N Nov 2022 General Dynamics / Falls Church, VA C / TBD Pax River, MD Oct 2025 Oct 2026 1 343,000.00 N Contractor and Location Qty (Each) 1.1.14) ARC-210 Radio Communication System (RCS) Shore 2023 (27) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Mar 2023 Jun 2024 2 797,203.00 N Nov 2022 1.1.14) ARC-210 Radio Communication System (RCS) Shore 2024 (28) NAWC WOLF / NAWCAD Patuxent River, MD Reqn Pax River, MD Apr 2024 Jul 2025 2 813,147.00 N Nov 2022 1.1.15) MUOS Digital Modular Radio (DMR) Communication System Shore 2020 (29) NAWC WOLF / NAWCAD Patuxent RIver, MD Reqn Pax River, MD Oct 2019 Feb 2023 1 1,211K Y 1.1.15) MUOS Digital Modular Radio (DMR) Communication System Shore 2021 (30) NAWC WOLF / NAWCAD Patuxent RIver, MD C / FP Pax River, MD Apr 2021 Aug 2024 1 1,532K Y Sep 2018 1.1.15) MUOS Digital Modular Radio (DMR) Communication System Shore 2025 NAWC WOLF / NAWCAD Patuxent RIver, MD C / FP Pax River, MD Apr 2025 Aug 2028 1 1,871K Y Sep 2018 1.1.15) MUOS Digital Modular Radio (DMR) Communication System Shore 2026 NAWC WOLF / NAWCAD Patuxent RIver, MD C / FP Pax River, MD Apr 2026 Aug 2029 1 1,908K N Sep 2018 1.1.16) Data Transfer System (DTS) - 1 2021 Defense Logistics Agency / Philadelphia, PA Reqn Philadelphia, PA Sep 2021 Sep 2022 1 278,519.00 N 1.1.16) Data Transfer System (DTS) - 1 2023 Defense Logistics Agency / Philadelphia, PA Reqn Philadelphia, PA Feb 2023 Feb 2024 3 314,538.00 N 1.1.17) UCA Transport System (UTS) 2022 General Dynamics / Falls Church, VA C / TBD Pax River, MD Jan 2022 Jan 2023 1 468,468.00 N 1.1.17) UCA Transport System (UTS) 2023 General Dynamics / Falls Church, VA C / TBD Pax River, MD Feb 2023 Feb 2024 4 513,675.00 N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 12 of 19 P-1 Line #102 Nov 2022 Nov 2022 Volume 3 - 172 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 (†) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn FY Contractor and Location Method/Type or Funding Vehicle 1.1.17) UCA Transport System (UTS) 2024 General Dynamics / Falls Church, VA C / TBD Pax River, MD Apr 2024 Apr 2025 2 987,000.00 N 1.1.17) UCA Transport System (UTS) 2026 General Dynamics / Falls Church, VA C / TBD Pax River, MD Oct 2025 Oct 2026 1 1,160K N 1.1.18) Air Traffic Control (ATC) Picture (UYY-1) 2023 NAWC / Patuxent River, MD C / TBD Pax River, MD Jan 2023 Jan 2024 3 84,896.00 Y 1.1.18) Air Traffic Control (ATC) Picture (UYY-1) 2025 NAWC / Patuxent River, MD C / TBD Pax River, MD Dec 2024 Dec 2025 1 88,326.00 N 1.1.18) Air Traffic Control (ATC) Picture (UYY-1) 2026 NAWC / Patuxent River, MD C / TBD Pax River, MD Oct 2025 Oct 2026 1 70,000.00 N 1.1.19) ARC-210 Shore Voice Communication System 2021 Defense Logistics Agency / Philadelphia, PA Reqn Philadelphia, PA Feb 2022 Feb 2023 1 613,874.00 Y Oct 2021 1.1.19) ARC-210 Shore Voice Communication System 2023 Defense Logistics Agency / Philadelphia, PA Reqn Philadelphia, PA Jan 2023 Jan 2024 1 639,453.00 N Oct 2022 1.1.19) ARC-210 Shore Voice Communication System 2024 Defense Logistics Agency / Philadelphia, PA Reqn Philadelphia, PA Jul 2024 Jul 2025 1 652,242.00 N Oct 2022 1.1.20) Ancillaries (Shore Only) 2023 NAWC / Patuxent River, MD Reqn ** NO PCO ** May 2023 May 2024 2 123,547.50 N Cost Elements O O C P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Nov 2024 indicates the presence of a P-21 Footnotes: (19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (30) Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. Manufacturer is represented by NAWC WOLF due to multiple vendors supplying items. All items are assembled/integrated at NAWC WOLF in Patuxent River to produce the final end item. LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 13 of 19 P-1 Line #102 Volume 3 - 173 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT 1.1.1) MD-5C CVN Based GCS-Block I Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 2023 NAVY 2 0 2 2 1 2024 NAVY 1 0 1 1 1.1.4) MD-5D Shore Based GCS-Block I (3) 2 2023 NAVY 4 0 4 4 2 2026 NAVY 1 0 1 1 0 4 1.1.11) Shore Common Data Link (CDL) 3 2023 NAVY 4 (8) 4 O C T N O V D E C J A N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #102 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 174 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT 1.1.1) MD-5C CVN Based GCS-Block I 2023 NAVY 2 0 2 1 2024 NAVY 1 0 1 1.1.4) MD-5D Shore Based GCS-Block I 2023 NAVY 4 0 4 2 2026 NAVY 1 0 1 0 4 1.1.11) Shore Common Data Link (CDL) NAVY 4 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A - - - - - - - 2 1 (3) 2 2023 Calendar Year 2022 O C T B A L A N C E Fiscal Year 2023 (1) 1 3 Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn A - - - - - - - 4 1 (8) A O C T N O V D E C J A N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #102 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 175 4 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 1.1.1) MD-5C CVN Based GCS-Block I Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B 2023 NAVY 2 0 2 - - - - - - - - - - - - - - - 1 2024 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.1.4) MD-5D Shore Based GCS-Block I 2023 NAVY 4 0 4 2 2026 NAVY 1 0 1 0 4 1.1.11) Shore Common Data Link (CDL) NAVY 4 A P R M A Y J U N J U L A U G S E P 1 - - - 1 0 1 0 (3) 2 2023 M A R B A L A N C E (1) 1 3 Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 1 - 1 - 1 - - - 1 0 1 (8) O C T N O V D E C J A N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy F E B M A R A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 16 of 19 S E P 1 O C T N O V 1 D E C J A N 1 F E B P-1 Line #102 0 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 176 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 1.1.1) MD-5C CVN Based GCS-Block I Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) 1 2023 NAVY 2 2 0 0 1 2024 NAVY 1 1 0 0 1.1.4) MD-5D Shore Based GCS-Block I (3) 2 2023 NAVY 4 4 0 2 2026 NAVY 1 0 1 4 0 1.1.11) Shore Common Data Link (CDL) 3 2023 NAVY 4 0 A - - - - - - - - - - - - - - - 1 (8) 0 O C T N O V D E C J A N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #102 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 177 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 1.1.1) MD-5C CVN Based GCS-Block I Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 1 2023 NAVY 2 2 0 0 1 2024 NAVY 1 1 0 0 1.1.4) MD-5D Shore Based GCS-Block I (3) 2 2023 NAVY 4 4 0 2 2026 NAVY 1 0 1 4 0 1.1.11) Shore Common Data Link (CDL) 3 2023 NAVY 4 0 1 0 (8) 0 O C T N O V D E C J A N LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #102 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 178 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 4269 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Appropriation / Budget Activity / Budget Sub Activity: 1810N / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn Procurement Leadtime (Months) Initial ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NSMA - Washington DC 1 2 4 0 1 16 17 0 6 16 22 2 NSMA - Washington, DC 1 2 4 0 6 18 24 0 3 15 18 3 CUBIC - CALIFORNIA 2 4 8 6 9 14 23 1 10 12 22 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4269 - UMCS-Unman Carrier Aviation(UCA)Mission ... Navy UNCLASSIFIED Page 19 of 19 P-1 Line #102 Volume 3 - 179 === page 256 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 180