=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 2 of 5 Other Procurement, Navy Budget Activity 02 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activity 01............................................................................................................................................................. Volume 1 Budget Activity 02............................................................................................................................................................. Volume 2 Budget Activity 03............................................................................................................................................................. Volume 3 Budget Activity 04............................................................................................................................................................. Volume 4 Budget Activities 05-08.....................................................................................................................................................Volume 5 UNCLASSIFIED Volume 2 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 2 Table of Contents Cost of Report............................................................................................................................................................. Volume 2 - v Introduction and Explanation of Contents..............................................................................................................Volume 2 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 2 - ix Master Line Item Table of Contents (by Appropriation then Line Number)...........................................................Volume 2 - li Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................. Volume 2 - lxi Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 2 - lxix Line Item Table of Contents (Alphabetically by Line Item Title)....................................................................... Volume 2 - lxxiii Executive Summary..............................................................................................................................................Volume 2 - lxxvii Exhibit P-40s................................................................................................................................................................ Volume 2 - 1 UNCLASSIFIED Volume 2 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - iv === page 7 === OPN 1 OPN 2 OPN 3 OPN 4 OPN 5-8 The estimated cost of this report for the Department of the Navy (DON) is $58,268. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $58,268 The estimated cost of this report for the Department of the Navy (DON) is $100,759. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $100,759 The estimated cost of this report for the Department of the Navy (DON) is $23,118. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $23,118 The estimated cost of this report for the Department of the Navy (DON) is $38,526. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $38,526 The estimated cost of this report for the Department of the Navy (DON) is $29,304. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $29,304 Volume 2 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - vi === page 9 === Department of Defense Appropriations Act, 2027 Other Procurement, Navy For procurement, production, and modernization of support equipment and materials not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships, and ships authorized for conversion); the purchase of passenger motor vehicles for replacement only; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $18,866,679 to remain available for obligation until September 30, 2029, of which $0 shall be available for the Navy Reserve and the Marine Corps Reserve: Provided, That such funds are also available for the maintenance, repair, and modernization of ships. Volume 2 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy 15,817,464 14,693,978 5,802,107 20,496,085 Grand Total Department of War 15,817,464 14,693,978 5,802,107 20,496,085 UNCLASSIFIED Volume 2 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 Total Department of the Navy 18,866,679 50,000 18,916,679 Grand Total Department of War 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 2 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy UNCLASSIFIED Volume 2 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 2 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ships support equipment 6,488,639 5,839,954 3,510,954 9,350,908 02. Communications and electronics equipment 4,075,820 4,467,421 143,000 4,610,421 03. Aviation support equipment 883,449 843,043 80,000 923,043 04. Ordnance support equipment 1,432,684 1,660,570 17,380 1,677,950 260,583 350,308 200 350,508 1,049,044 672,821 40,800 713,621 05. Civil engineering support equipment 06. Supply support equipment 07. Personnel and command support equipment 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 15,817,464 14,693,978 5,802,107 20,496,085 08. Spares and repair parts Total Other Procurement, Navy UNCLASSIFIED Volume 2 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ships support equipment 7,696,789 02. Communications and electronics equipment 50,000 7,746,789 5,446,166 5,446,166 03. Aviation support equipment 899,479 899,479 04. Ordnance support equipment 2,210,273 2,210,273 05. Civil engineering support equipment 353,489 353,489 06. Supply support equipment 396,204 396,204 1,098,568 1,098,568 765,711 765,711 07. Personnel and command support equipment 08. Spares and repair parts Total Other Procurement, Navy 18,866,679 UNCLASSIFIED 50,000 18,916,679 Volume 2 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 20,840 9,978 9,978 A U 77,592 62,004 62,004 A U 97,206 96,945 96,945 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 275,575 204,863 204,863 5 DDG Mod A U 822,065 878,787 878,787 6 Firefighting Equipment A U 38,521 36,488 36,488 UNCLASSIFIED Volume 2 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 22,668 22,668 A U 103,871 103,871 A U 83,510 83,510 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 344,885 344,885 5 DDG Mod A U 1,000,278 1,000,278 6 Firefighting Equipment A U 177,708 177,708 UNCLASSIFIED Volume 2 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 7 Command and Control Switchboard A U 2,402 2,417 8 LHA/LHD Midlife A U 76,601 60,617 9 LCC 19/20 Extended Service Life Program A U 7,352 19,276 19,276 10 Pollution Control Equipment B U 23,440 22,477 22,477 11 Submarine Support Equipment A U 278,766 383,062 383,062 12 Virginia Class Support Equipment A U 43,565 52,039 52,039 13 LCS Class Support Equipment U 5,855 2,551 2,551 14 Submarine Batteries U 30,470 28,169 28,169 15 LPD Class Support Equipment U 45,738 96,542 16 DDG 1000 Class Support Equipment A U 325,668 115,267 115,267 17 Strategic Platform Support Equip A U 53,931 38,039 38,039 UNCLASSIFIED 2,417 65,400 29,000 126,017 125,542 Volume 2 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7 Command and Control Switchboard A U 2,259 2,259 8 LHA/LHD Midlife A U 131,315 131,315 9 LCC 19/20 Extended Service Life Program A U 766 766 10 Pollution Control Equipment B U 22,506 22,506 11 Submarine Support Equipment A U 330,951 330,951 12 Virginia Class Support Equipment A U 83,297 83,297 13 LCS Class Support Equipment U 15,815 15,815 14 Submarine Batteries U 26,211 26,211 15 LPD Class Support Equipment U 213,723 213,723 16 DDG 1000 Class Support Equipment A U 58,284 58,284 17 Strategic Platform Support Equip A U 72,163 72,163 UNCLASSIFIED Volume 2 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2025 Actuals Sec U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 4,586 Cost Qty Qty 5,849 U A Cost FY 2026 Total Cost 5,849 694,020 694,020 20,321 20,321 U 11,013 U 16,650 22,355 A U 66,346 12,691 A U 3,254 2,607 2,607 22,355 7,400 20,091 Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,573,098 2,392,620 2,392,620 25 Reactor Components A U 445,974 474,806 474,806 A U 14,000 7,842 7,842 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 2 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 7,440 7,440 U 585 585 U 22,515 22,515 U 20,575 20,575 A U 69,425 69,425 A U 2,425 2,425 A Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,737,140 2,737,140 25 Reactor Components A U 519,821 519,821 A U 33,013 33,013 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 2 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 28 Standard Boats A U 447,298 A U 1,950,714 1,950,714 82,086 5,100 87,186 209,304 394,998 390,600 785,598 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 56,103 38,880 38,880 31 LCS MCM Mission Modules U 118,247 91,372 91,372 32 LCS SUW Mission Modules U 11,101 3,790 3,790 33 LCS In-Service Modernization A U 188,254 189,458 189,458 34 Small & Medium UUV A U 48,780 7,000 UNCLASSIFIED 345,086 352,086 Volume 2 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 121,130 28 Standard Boats A U 97,746 97,746 A U 492,100 492,100 50,000 171,130 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 30,565 30,565 31 LCS MCM Mission Modules U 65,113 65,113 32 LCS SUW Mission Modules U 1,719 1,719 33 LCS In-Service Modernization A U 315,272 315,272 34 Small & Medium UUV A U 110,955 110,955 UNCLASSIFIED Volume 2 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 35 Large UUV A U 36 Extra Large UUV A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty 3,313 Cost 3,313 Logistic Support 37 LSD Midlife & Modernization U Total Ships support equipment 49,044 4,079 6,488,639 5,839,954 4,079 3,510,954 9,350,908 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 7,402 39 AN/SQQ-89 Surf ASW Combat System A U 134,635 144,425 144,425 40 SSN Acoustic Equipment A U 458,824 498,597 498,597 41 Undersea Warfare Support Equipment A U 14,247 UNCLASSIFIED Volume 2 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 35 Large UUV A U 222,998 222,998 36 Extra Large UUV A U 135,802 135,802 U 240 240 Logistic Support 37 LSD Midlife & Modernization Total Ships support equipment 7,696,789 50,000 7,746,789 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 39 AN/SQQ-89 Surf ASW Combat System A U 142,355 142,355 40 SSN Acoustic Equipment A U 454,161 454,161 41 Undersea Warfare Support Equipment A U UNCLASSIFIED Volume 2 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 51,514 56,482 56,482 43 SSTD A U 9,647 14,915 14,915 44 Fixed Surveillance System A U 405,854 352,312 45 SURTASS A U 45,975 31,169 31,169 A U 190,011 422,704 422,704 A U 361,915 379,908 379,908 U 4,680 13,008 13,008 143,000 495,312 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 2 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 68,881 68,881 43 SSTD A U 14,857 14,857 44 Fixed Surveillance System A U 490,548 490,548 45 SURTASS A U 72,190 72,190 A U 653,483 653,483 A U 701,667 701,667 U 8,652 8,652 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 2 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 49 Cooperative Engagement Capability B U 26,644 26,648 26,648 50 Naval Tactical Command Support System (NTCSS) A U 13,614 7,972 7,972 51 ATDLS A U 68,458 58,739 58,739 52 Navy Command and Control System (NCCS) U 3,645 3,489 3,489 53 Minesweeping System Replacement A U 16,808 16,426 16,426 54 Navstar GPS Receivers (SPACE) A U 37,964 45,701 45,701 55 American Forces Radio and TV Service A U 3,802 304 304 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 90,586 97,262 97,262 57 Afloat ATC Equipment A U 74,458 72,104 72,104 58 ID Systems A U 59,602 52,171 52,171 UNCLASSIFIED Volume 2 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 49 Cooperative Engagement Capability B U 33,932 33,932 50 Naval Tactical Command Support System (NTCSS) A U 10,108 10,108 51 ATDLS A U 52,758 52,758 52 Navy Command and Control System (NCCS) U 16,167 16,167 53 Minesweeping System Replacement A U 14,879 14,879 54 Navstar GPS Receivers (SPACE) A U 43,097 43,097 55 American Forces Radio and TV Service A U 289 289 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 83,057 83,057 57 Afloat ATC Equipment A U 62,581 62,581 58 ID Systems A U 35,620 35,620 UNCLASSIFIED Volume 2 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost U 7,287 5,105 5,105 U 42,326 60,058 60,058 U 8,479 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 66,470 64,901 64,901 63 Intelligence Surveillance and Reconnaissance (ISR) A U 16,946 12,112 12,112 64 CANES U 439,977 534,324 534,324 65 RADIAC U 38,688 31,289 31,289 66 CANES-Intell U 50,654 46,281 46,281 67 GPETE U 32,005 33,395 33,395 68 MASF U 24,361 13,205 13,205 A A UNCLASSIFIED Volume 2 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 2,976 2,976 U 54,487 54,487 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 48,262 48,262 63 Intelligence Surveillance and Reconnaissance (ISR) A U 11,824 11,824 64 CANES U 493,046 493,046 65 RADIAC U 38,000 38,000 66 CANES-Intell U 43,028 43,028 67 GPETE U 31,462 31,462 68 MASF U 5,822 5,822 U A A UNCLASSIFIED Volume 2 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 69 Integ Combat System Test Facility A U 6,709 11,493 11,493 70 EMI Control Instrumentation A U 4,081 3,687 3,687 71 In-Service Radars and Sensors A U 262,890 249,656 249,656 Shipboard Communications 72 Battle Force Tactical Network A U 104,019 106,583 106,583 73 Shipboard Tactical Communications A U 24,602 20,900 20,900 74 Ship Communications Automation A U 127,321 162,075 162,075 75 Communications Items Under $5M A U 9,209 11,138 11,138 Submarine Communications 76 Submarine Broadcast Support A U 129,467 113,115 113,115 77 Submarine Communication Equipment A U 68,334 84,584 84,584 UNCLASSIFIED Volume 2 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 69 Integ Combat System Test Facility A U 6,454 6,454 70 EMI Control Instrumentation A U 3,435 3,435 71 In-Service Radars and Sensors A U 338,946 338,946 Shipboard Communications 72 Battle Force Tactical Network A U 125,661 125,661 73 Shipboard Tactical Communications A U 50,350 50,350 74 Ship Communications Automation A U 156,605 156,605 75 Communications Items Under $5M A U 15,097 15,097 Submarine Communications 76 Submarine Broadcast Support A U 173,069 173,069 77 Submarine Communication Equipment A U 88,071 88,071 UNCLASSIFIED Volume 2 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 59,732 62,943 62,943 U 162,928 63,433 63,433 220,453 220,453 A U A U 4,551 3,389 3,389 Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 195,063 191,239 191,239 83 MIO Intel Exploitation Team A U 1,100 1,122 1,122 Cryptologic Equipment UNCLASSIFIED Volume 2 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 57,961 57,961 U 57,768 57,768 A U 202,305 202,305 A U Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 349,099 349,099 83 MIO Intel Exploitation Team A U 1,063 1,063 Cryptologic Equipment UNCLASSIFIED Volume 2 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty A U 15,506 Cost Qty Cost FY 2026 Total Qty Cost 7,841 7,841 58,764 58,764 Other Electronic Support 85 DON TRR-1 (Afloat) A U 10,370 86 DON UAS Video 5 (Afloat) A U 5,370 87 USN Ashore/Shipboard CONOPS Verification and A U 6,586 88 USN Training Ranges - Codify CONOPS/TTPs A U 1,375 89 USN Training Ranges - Spectrum Sensing A U 1,000 90 USN EME Sensing and Monitoring A U 120 91 Coast Guard Equipment A U 49,523 A U 18,486 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 2 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2027 Discretionary Request Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7,419 7,419 Other Electronic Support 85 DON TRR-1 (Afloat) A U 86 DON UAS Video 5 (Afloat) A U 87 USN Ashore/Shipboard CONOPS Verification and A U 88 USN Training Ranges - Codify CONOPS/TTPs A U 89 USN Training Ranges - Spectrum Sensing A U 90 USN EME Sensing and Monitoring A U 91 Coast Guard Equipment A U 67,106 67,106 A U 57,568 57,568 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 2 - xxxvi === page 39 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Total Communications and electronics equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 4,075,820 4,467,421 143,000 4,610,421 80,000 369,908 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 353,441 289,908 Aircraft Support Equipment 94 Minotaur A U 5,431 5,191 5,191 95 Weapons Range Support Equipment A U 138,062 123,435 123,435 96 Aircraft Support Equipment A U 121,727 82,039 82,039 97 Advanced Arresting Gear (AAG) A U 2,244 4,484 4,484 98 Electromagnetic Aircraft Launch System (EMALS A U 14,702 16,294 16,294 99 Meteorological Equipment A U 17,982 13,806 13,806 UNCLASSIFIED Volume 2 - xxxvii === page 40 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Total Communications and electronics equipment Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 5,446,166 5,446,166 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 300,151 300,151 Aircraft Support Equipment 94 Minotaur A U 4,831 4,831 95 Weapons Range Support Equipment A U 119,900 119,900 96 Aircraft Support Equipment A U 69,065 69,065 97 Advanced Arresting Gear (AAG) A U 23,551 23,551 98 Electromagnetic Aircraft Launch System (EMALS A U 36,908 36,908 99 Meteorological Equipment A U 7,477 7,477 UNCLASSIFIED Volume 2 - xxxviii === page 41 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 100 Airborne MCM A U 10,643 9,643 9,643 101 Aviation Support Equipment A U 99,656 111,334 111,334 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 119,561 186,909 186,909 883,449 843,043 Total Aviation support equipment 80,000 923,043 Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,712 7,358 7,358 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 226 209 209 105 Ship Missile Support Equipment A U 431,830 527,292 527,292 106 Tomahawk Support Equipment A U 98,921 107,709 107,709 FBM Support Equipment UNCLASSIFIED Volume 2 - xxxix === page 42 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 100 Airborne MCM A U 9,507 9,507 101 Aviation Support Equipment A U 116,873 116,873 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 211,216 211,216 899,479 899,479 Total Aviation support equipment Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,962 6,962 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 195 195 105 Ship Missile Support Equipment A U 431,069 431,069 106 Tomahawk Support Equipment A U 116,208 116,208 FBM Support Equipment UNCLASSIFIED Volume 2 - xl === page 43 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty 107 CPS Support Equipment A U 108 Strategic Missile Systems Equip A U 320,691 491,179 Cost FY 2026 Total Qty 67,264 Cost 67,264 9,180 500,359 ASW Support Equipment 109 SSN Combat Control Systems A U 153,237 102,954 102,954 110 ASW Support Equipment A U 25,362 25,721 25,721 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 52,885 17,758 17,758 112 Directed Energy Systems A U 3,817 2,976 2,976 113 Items Less Than $5 Million A U 3,193 3,635 3,635 A U 75,614 50,741 50,741 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 2 - xli === page 44 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 107 CPS Support Equipment A U 188,430 188,430 108 Strategic Missile Systems Equip A U 327,941 327,941 ASW Support Equipment 109 SSN Combat Control Systems A U 165,416 165,416 110 ASW Support Equipment A U 25,105 25,105 48,252 48,252 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 112 Directed Energy Systems A U 113 Items Less Than $5 Million A U 2,592 2,592 A U 606,241 606,241 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 2 - xlii === page 45 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 80,236 Cost Qty Cost FY 2026 Total Qty 77,889 Cost 77,889 179,960 177,885 8,200 186,085 1,432,684 1,660,570 17,380 1,677,950 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,751 3,825 3,825 118 General Purpose Trucks A U 5,795 5,489 5,489 119 Trailers A U 120 Construction & Maintenance Equip A U 76,983 105,592 105,592 121 Fire Fighting Equipment A U 23,006 27,675 27,675 122 Tactical Vehicles B U 36,355 37,262 37,262 123 Amphibious Equipment A U 6,454 38,073 38,073 200 UNCLASSIFIED 200 Volume 2 - xliii === page 46 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2027 Mandatory Request Qty 73,681 Cost FY 2027 Total Qty Cost 73,681 218,181 218,181 2,210,273 2,210,273 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,567 3,567 118 General Purpose Trucks A U 4,801 4,801 119 Trailers A U 120 Construction & Maintenance Equip A U 91,269 91,269 121 Fire Fighting Equipment A U 17,107 17,107 122 Tactical Vehicles B U 46,796 46,796 123 Amphibious Equipment A U 53,916 53,916 UNCLASSIFIED Volume 2 - xliv === page 47 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 124 Pollution Control Equipment A U 3,924 4,009 4,009 125 Items less than $5 Million A U 103,014 127,086 127,086 126 Physical Security Vehicles A U 1,301 1,297 1,297 260,583 350,308 Total Civil engineering support equipment 200 350,508 40,800 40,800 Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 56,585 128 First Destination Transportation A U 6,463 6,203 129 Special Purpose Supply Systems A U Total Supply support equipment 985,996 666,618 1,049,044 672,821 5,341 3,480 6,203 666,618 40,800 713,621 Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED 3,480 Volume 2 - xlv === page 48 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 124 Pollution Control Equipment A U 3,586 3,586 125 Items less than $5 Million A U 131,449 131,449 126 Physical Security Vehicles A U 998 998 353,489 353,489 Total Civil engineering support equipment Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 67,828 67,828 128 First Destination Transportation A U 4,732 4,732 129 Special Purpose Supply Systems A U 323,644 323,644 396,204 396,204 10,608 10,608 Total Supply support equipment Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED Volume 2 - xlvi === page 49 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost A U 43,126 73,631 73,631 Command Support Equipment 132 Command Support Equipment A U 29,698 34,249 34,249 133 Medical Support Equipment A U 10,122 24,256 24,256 135 Naval MIP Support Equipment A U 6,590 8,810 136 Operating Forces Support Equipment A U 17,941 16,567 16,567 137 C4ISR Equipment A U 33,606 36,945 36,945 138 Environmental Support Equipment A U 47,499 42,860 42,860 139 Physical Security Equipment A U 138,799 166,577 166,577 140 Enterprise Information Technology A U 42,026 42,363 42,363 UNCLASSIFIED 21,946 30,756 Volume 2 - xlvii === page 50 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost A U 331,016 331,016 Command Support Equipment 132 Command Support Equipment A U 55,202 55,202 133 Medical Support Equipment A U 54,862 54,862 135 Naval MIP Support Equipment A U 5,213 5,213 136 Operating Forces Support Equipment A U 15,107 15,107 137 C4ISR Equipment A U 33,975 33,975 138 Environmental Support Equipment A U 60,467 60,467 139 Physical Security Equipment A U 218,037 218,037 140 Enterprise Information Technology A U 40,490 40,490 UNCLASSIFIED Volume 2 - xlviii === page 51 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Other 141 Cancelled Account Adjustments A U 46 142 Next Generation Enterprise Service A U 226,479 185,755 185,755 143 Cyberspace Activities A U 2,195 2,239 2,239 Classified Programs 999 Classified Programs U 16,134 62,991 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 Total Spares and repair parts 1,007,643 159,138 1,987,827 2,146,965 Total Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Personnel and command support equipment 62,991 Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED Volume 2 - xlix === page 52 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Other 141 Cancelled Account Adjustments A U 142 Next Generation Enterprise Service A U 223,647 223,647 143 Cyberspace Activities A U 7,131 7,131 Classified Programs 999 Classified Programs U 42,813 42,813 1,098,568 1,098,568 765,711 765,711 Total Spares and repair parts 765,711 765,711 Total Other Procurement, Navy 18,866,679 Total Personnel and command support equipment Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED 50,000 18,916,679 Volume 2 - l === page 53 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 2 - li === page 54 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 2 - lii === page 55 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 UNCLASSIFIED Volume 2 - liii === page 56 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 UNCLASSIFIED Volume 2 - liv === page 57 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 UNCLASSIFIED Volume 2 - lv === page 58 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 2 - lvi === page 59 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 2 - lvii === page 60 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 127 06 01 7025 Supply Equipment.............................................................................................................................. Volume 5 - 121 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 UNCLASSIFIED Volume 2 - lviii === page 61 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 129 06 01 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 7069 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 143 07 05 8645 Cyberspace Activities.........................................................................................................................Volume 5 - 315 UNCLASSIFIED Volume 2 - lix === page 62 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 2 - lx === page 63 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 UNCLASSIFIED Volume 2 - lxi === page 64 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 EOD Equipment 5509 111 04 06................... Volume 4 - 141 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 UNCLASSIFIED Volume 2 - lxii === page 65 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 ID Systems 2851 58 02 09................... Volume 2 - 471 In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 UNCLASSIFIED Volume 2 - lxiii === page 66 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Minotaur 3640 94 03 03..................... Volume 3 - 31 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 UNCLASSIFIED Volume 2 - lxiv === page 67 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 RADIAC 2920 65 02 10................... Volume 2 - 579 Reactor Components 1020 25 01 10................... Volume 1 - 491 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 SURTASS 2237 45 02 03................... Volume 2 - 143 UNCLASSIFIED Volume 2 - lxv === page 68 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 UNCLASSIFIED Volume 2 - lxvi === page 69 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 2 - lxvii === page 70 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - lxviii === page 71 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 UNCLASSIFIED Volume 2 - lxix === page 72 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 UNCLASSIFIED Volume 2 - lxx === page 73 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 UNCLASSIFIED Volume 2 - lxxi === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - lxxii === page 75 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 ID Systems 2851 58 02 09................... Volume 2 - 471 UNCLASSIFIED Volume 2 - lxxiii === page 76 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 RADIAC 2920 65 02 10................... Volume 2 - 579 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 UNCLASSIFIED Volume 2 - lxxiv === page 77 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page SURTASS 2237 45 02 03................... Volume 2 - 143 Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 UNCLASSIFIED Volume 2 - lxxv === page 78 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - lxxvi === page 79 === Executive Summary for Other Procurement, Navy Table 1: FundingOverview Discretionary Mandatory Total BLI 0933 0946 0954 0954 0956 0970 0970 0981 1210 1445 1445 1611 1613 2225 3050 3415 4048 5358 5664 6007 7025 8114 9020 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 15,817,464 14,693,978 18,866,679 31,650 5,802,107 50,000 15,849,114 20,496,085 18,916,679 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title Readiness Readiness Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Readiness Readiness INDOPACOM Capabilities INDOPACOM Capabilities Readiness Shipbuilding Shipbuilding INDOPACOM Capabilities Low-Cost Weapons Low-Cost Weapons Munitions and Supply Chain Nuclear Readiness INDOPACOM Capabilities Shipbuilding INDOPACOM Capabilities Readiness FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 23,775 $ 7,875 $ $ $ $ $ $ $ $ 31,650 FY 2026 ($K) $ 65,400 $ 29,000 $ 1,950,714 $ $ 694,020 $ 20,148 $ 173 $ 7,400 $ 5,100 $ 117,600 $ 273,000 $ 345,086 $ 3,313 $ 143,000 $ $ $ 80,000 $ 9,180 $ 8,200 $ 200 $ 40,800 $ 21,946 $ 1,987,827 $ 5,802,107 FY 2027 ($K) $ $ $ $ 50,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 50,000 Volume 2 - lxxvii === page 80 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Other Procurement, Navy includes $18,866,679 thousand of discretionary and $50,000 thousand of mandatory for a total of $18,916,679 thousand. The mandatory funds support: Medium Uncrewed Surface Vessels (MUSV): The Navy’s FY 2027 mandatory budget request includes $50 million for the procurement of one vessel. The FY 2026 spend plan for Other Procurement, Navy includes $14,693,978 thousand of discretionary and $5,802,107 thousand of mandatory for a total of $20,496,085 thousand. The FY 2025 spend plan for Other Procurement, Navy includes $15,817,464 thousand of discretionary and $31,650 thousand of mandatory for a total of $15,849,114 thousand. Volume 2 - lxxviii === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 321.645 321.645 321.645 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 7.402 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 7.402 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 7.402 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.847 Continuing Total 329.047 329.047 329.047 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.347 - - - - 1.366 1.868 0.912 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. This program provides for procurement of AN/SPQ-9B radars whose primary mission is to detect and track low flying Anti-Ship Missile targets in heavy clutter. The mission of the AN/SPQ-9B has been expanded to include the capability to detect and classify periscopes. The Periscope Detection and Discrimination (PDD) capability has been designed and incorporated to operate concurrently with the Anti-Ship Missile Defense (ASMD) capability. [BR5IN AN/SPQ-9B FMP INSTALLATIONS]: AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Radars continue to be procured for new construction DDGs and improvements to these and in-service systems continue to be deployed to pace the threat. [BR6IN AN/SPQ-9B NON-FMP INSTALLATIONS]: Provided funding for the installation of equipment for Land Based Test Sites (LBTS). [P40A / BR040 TRANSMITTER UPGRADE FMP]: Funding was provided for installations of AN/SPQ-9B Transmitter Upgrades on LPD-17. [P40A / BR040 TRANSMITTER UPGRADE NON-FMP EQUIPMENT]: Funding provided for Transmitter Upgrade Processor installations at Surface Warfare Engineering Facility (SWEF) and Combat Systems Engineering Development Site (CSEDS) (both non-FMP). [P40A / BR042 AN/SPQ-9B ENGINEERING CHANGE PROPOSALS (ECP)]: Procures product improvements generated by Engineering Change Proposals (ECPs); corrects problems reported by Fleet units; upgrades unreliable components and replaces obsolete components and parts no longer in production for AN/SPQ-9B Radar; and addresses supportability concerns. Purchases and installs ECPs, including Antenna Shock Upgrade Kits, Antenna Radar Components, Digital Signal Processor (DSP) Kits, Periscope Detection and Discrimination (PDD) Kits and engineering change kit hardware components. Antenna Shock Upgrade Kits are installed during Antenna Restorations. DSP and PDD kits are installed conjunctively via Alteration Installation Team (AIT) and can be accomplished outside of a CNO Availability. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 1 of 8 P-1 Line #38 Volume 2 - 1 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / BR830 AN/SPQ-9B PRODUCTION SUPPORT]: Provides support for production of hardware and hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance and software certification. [P3A / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT]: Procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability to Shipboard Combat Systems. Procures radars to support combat systems on the following ship classes: CG, LHA, DDG, CVN, LHD, LPD, U.S. Coast Guard National Security Cutter and a Training Unit. Systems procured for Cruisers/Destroyers (CRUDES) and Amphibious Ships in FY14 through FY21 include the Periscope Detection and Discrimination (PDD) capability. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 2 of 8 P-1 Line #38 Volume 2 - 2 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SPQ-9B Radar - / 171.951 - / 6.030 P-3a 1 / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT (TBD) - / 149.694 - / 1.372 P-40 Total Gross/Weapon System Cost - / 321.645 - / 7.402 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - / 0.000 - / 0.000 - / - - / 0.000 - / 0.000 - / - - - / 0.000 - - / 0.000 - / / 0.000 / 0.000 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SPQ-9B Radar P-3a 1 / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT (TBD) - - / 0.000 / - - / 0.000 / - - / 0.000 / - - / 0.000 / - P-40 Total Gross/Weapon System Cost - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / - - / - / 0.000 - / 151.066 / - - / 329.047 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 3 of 8 P-1 Line #38 Volume 2 - 3 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: SPQ-9B Radar Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) BR040 AN/SPQ-9B RADAR 1.1) BR040 ANTENNA A 1.2) BR040 ANTENNA TEST STAND A 1.3) BR040 TRANSMITTER UPGRADE FMP A 1.4) BR040 TRANSMITTER UPGRADE NON-FMP EQUIPMENT A 2,529K 7 17.701 - - - - - - - - - - - - - - - 1,025K 1 1.025 - - - - - - - - - - - - - - - Subtotal: 1) BR040 AN/SPQ-9B RADAR - - 12.961 - - - - - - - - - - - - - - - - - 2.958 - - - - - - - - - - - - - - - - - 34.645 - - - - - - - - - - - - - - - 51.659 - - 1.748 - - - - - - - - - - - - 2) BR042 AN/SPQ-9B ENGINEERING CHANGE PROPOSALS (ECP) 2.1) BR042 MISCELLANEOUS ECPs A - (1) 2.2) BR042 ANTENNA SHOCK UPGRADE KITS A 2.3) BR042 DIGITAL SIGNAL PROCESSOR KITS PROCUREMENTS A 2.4) BR042 DIGITAL SIGNAL PROCESSOR KITS INSTALLS A 2.5) BR042 PDD KITS PROCUREMENT A 2.6) BR042 PDD KITS - INSTALLS A - 527,428.57 7 3.692 - - - - - - - - - - - - - - - 190,350.00 20 3.807 - - - - - - - - - - - - - - - 56,000.00 5 0.280 - - - - - - - - - - - - - - - 495,964.29 28 13.887 - - - - - - - - - - - - - - - 412,500.00 16 6.600 870,000.00 1.740 - - - - - - - - - - - - - - 79.925 - - 3.488 - - - - - - - - - - - - - - 35.754 - - 2.542 - - - - - - - - - - - - - - 35.754 - - 2.542 - - - - - - - - - - - - Subtotal: 2) BR042 AN/SPQ-9B ENGINEERING CHANGE PROPOSALS (ECP) 2 3) BR830 AN/SPQ-9B PRODUCTION SUPPORT 3.1) BR830 AN/SPQ-9B PRODUCTION SUPPORT A (2) Subtotal: 3) BR830 AN/SPQ-9B PRODUCTION SUPPORT 4) BRCA1 AN/SPQ-9B RADAR COMPONENTS LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 4 of 8 P-1 Line #38 Volume 2 - 4 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.1) BRCA1 AN/ SPQ-9B RADAR COMPONENTS A MAIS Code Unit Cost ($) Qty (Each) 7,400K Subtotal: 4) BRCA1 AN/SPQ-9B RADAR COMPONENTS - FY 2025 Total Cost ($ M) 2 - Unit Cost ($) Qty (Each) Aggregated Items Title: SPQ-9B Radar FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 14.800 - - - - - - - - - - - - - - - 14.800 - - - - - - - - - - - - - - - 6.800 - - - - - - - - - - - - - - - 5) BRCA2 AN/SPQ-9B RADAR COMPONENTS 5.1) BRCA2 AN/ SPQ-9B RADAR COMPONENTS A 6,800K Subtotal: 5) BRCA2 AN/SPQ-9B RADAR COMPONENTS 1 - - 6.800 - - - - - - - - - - - - - - - - - 0.027 - - - - - - - - - - - - - - - Subtotal: 6) WAXXX ACQUISITION WORKFORCE FUND - - 0.027 - - - - - - - - - - - - - - - Total - - 171.951 - - 6.030 - - - - - - - - - - - - 6) WAXXX ACQUISITION WORKFORCE FUND 6.1) WAXXX ACQUISITION WORKFORCE FUND-2009 A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Miscellaneous ECP funding primarily funds product improvements, corrects problems reported by Fleet units, upgrades unreliable components, replaces obsolete components/parts no longer in production, and addresses supportability concerns. Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. (2) AN/SPQ-9B Production Support funding provides support for production of hardware and production of hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 5 of 8 P-1 Line #38 Volume 2 - 5 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT MDAP/MAIS Code: Prior Years 149.694 149.694 149.694 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 1.372 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 1.372 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 1.372 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 151.066 151.066 151.066 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. Procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability to Shipboard Combat Systems. Procures radars to support combat systems on the following ship classes: CG, LHA, DDG, CVN, LHD, LPD, U.S. Coast Guard National Security Cutter and a Training Unit. Systems procured for Cruisers/Destroyer (CRUDES) and Amphibious Ships in FY14 through FY21 includes the Periscope Detection and Discrimination (PDD) capability. 1) AN/SPQ-9B was previously realigned from BLI 5110 to BLI 2026 in FY04. 2) AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. In FY26, installation funding decreases due to completion of the LHD 5 installation in FY25. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 6 of 8 P-1 Line #38 Volume 2 - 6 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/SPQ-9B RADAR FMP EQUIPMENT Prior Years Financial Plan Modification Number / Title: 1 / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: BR040 AN/SPQ-9B RADAR FMP EQUIPMENT B Kits Recurring 1.1.1) BR040 AN/SPQ-9B RADAR FMP EQUIPMENT - 14 / 73.193 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 73.193 1.1.2) BR040 AN/SPQ-9B NON-RECURRING (TDP) Organic - / 1.888 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.888 1.1.3) BR040 AN/SPQ-9B DMSMS LIFETIME BUY Organic - / 2.129 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.129 NonOrganic (3) Subtotal: Recurring / 77.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 77.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 77.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 77.210 Modification Item 1 of 1: BR040 AN/SPQ-9B RADAR FMP EQUIPMENT - / 72.484 - / 1.372 / 0.000 - / 0.000 - / 73.856 Subtotal: Installation - / 72.484 - / 1.372 / - - / 0.000 - / 73.856 Subtotal: BR040 AN/SPQ-9B RADAR FMP EQUIPMENT Subtotal: Procurement, All Modification Items - / 0.000 - / - - / 77.210 14 / 77.210 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2026 - SPQ-9B Radar Navy 149.694 1.372 0.000 0.000 0.000 UNCLASSIFIED Page 7 of 8 0.000 0.000 0.000 P-1 Line #38 0.000 0.000 0.000 151.066 Volume 2 - 7 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2026 / SPQ-9B Radar Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT MDAP/MAIS Code: Modification Item 1 of 1: BR040 AN/SPQ-9B RADAR FMP EQUIPMENT Installation Information Method of Implementation: [none specified]:: Installation Name: BR040 AN/SPQ-9B RADAR FMP EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 18 / 72.484 18 / 73.856 Prior Years 0 / 1.372 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.372 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 18 / 72.484 18 / 73.856 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18 Out 17 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18 1 Footnotes: (3) 1) AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. In FY26, installation funding decreases due to completion of the LHD 5 installation in FY25. Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. LI 2026 - SPQ-9B Radar Navy UNCLASSIFIED Page 8 of 8 P-1 Line #38 Volume 2 - 8 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,745.683 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,745.683 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,745.683 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 134.635 134.635 134.635 144.425 142.355 144.425 - - 142.355 144.425 0.000 - 0.000 - 142.355 0.000 142.355 142.355 142.355 156.022 156.022 156.022 159.709 159.709 159.709 158.800 158.800 158.800 To FY 2031 Complete 159.093 Continuing 159.093 Total - Continuing Continuing - Continuing - - Continuing Continuing 7.846 Continuing Continuing 159.093 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.693 - 2.358 - 2.358 2.588 7.526 8.450 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Effective FY 2026, OPN Budget Line Item (BLI) 2136 absorbed all OPN BLI 2176 Undersea Warfare (USW) Support Equipment Aircraft Carrier Tactical Support Center (CV-TSC), Sonar Dome Rubber Window (SDRW), and Undersea Warfare Decision Support System (USW-DSS) funding/programs in support of the Program Element (PE)/BLI consolidation initiative prescribed within the 'DoD Implementation Plan from the Commission on Planning, Programming, Budgeting and Execution (PPBE) Reform Final Report', to facilitate the effort to rapidly increase Navy Lethality in the Submarine and Surface Fleet. OPN Budget Line Item (BLI) 2136 consists of four separate and distinct programs, the OPNAV N96 sponsored AN/SQQ-89 Surface Anti-Submarine Warfare (ASW) Combat System program, the OPNAV N98 sponsored Aircraft Carrier Tactical Support Center (CV-TSC) program, the OPNAV N96 sponsored Sonar Dome Rubber Window (SDRW) program, and the OPNAV N2N6 sponsored Undersea Warfare Decision Support System (USW-DSS) program. 1. AN/SQQ-89 Surface ASW Combat System (Cost Codes DB400/DB830/DB900/DB6IN): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), Anti-Submarine Warfare (ASW) remains a Navy core competency in a dynamic and uncertain maritime environment. U.S. adversaries continue to develop asymmetric capabilities and capacities to deter, disrupt, or delay the entry of U.S. and allied naval forces, and pose a constant challenge as the Maritime Strategy is implemented. Evolving submarine technologies offer enhanced stealth, speed, endurance, weapons, and operational proficiency, trends foretelling that the adversary submarine of the future will have a significantly larger sphere of influence, while presenting less vulnerability to ASW forces. The effective offensive engagement range of the adversary submarine of the future will continue to match or outrange individual U.S. and multinational platform sensors and weapons in many tactical environments. Submarines are an increasing threat to all Naval and Allied ships, particularly modern diesel and state-of-the-art nuclear submarines, and faster, more accurate torpedoes. Not only can the presence of potential hostile submarines delay naval combatant action until they are located and neutralized, submarines can also disrupt all seaborne logistics supply for any ground campaign as well as maritime commerce. ASW forces must be effective in all operating environments, ranging from the deep open ocean to the littorals, and are key to countering adversarial anti-access and area denial strategies. The AN/SQQ-89(V) Surface Ship ASW Combat System provides integrated Undersea Warfare (USW) combat management, fire control, command and control, and on-board training to enable surface combatants to engage USW targets in both open ocean and littoral environments. The AN/SQQ-89(V) is a system comprised of many subsystems, which integrate the helo and its sensors, the ship's own organic sensors, weapons, torpedo detection, and a high-fidelity Surface ASW Synthetic Trainer (SAST). Variants of the AN/SQQ-89(V) are currently in operation on in-service CG47 and DDG51 Class Surface Combatants. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 1 of 38 P-1 Line #39 Volume 2 - 9 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A AN/SQQ-89A(V)15 Surface Ship ASW Combat System Upgrade: A major upgrade to the AN/SQQ-89(V) legacy system, the AN/SQQ-89A(V)15 significantly decreases ship vulnerability to torpedo attack, improves surface ship USW lethality, and mitigates Commercial-Off-The-Shelf (COTS) obsolescence and supportability issues. The need for the AN/SQQ-89A(V)15 is articulated in Operational Requirements Document (ORD) #667-76-05 titled 'AN/SQQ-89 Improvement Program'. The AN/SQQ-89A(V)15 upgrade is programmed for backfit via Ship Alteration (SHIPALT) on: Select CG47 Class Baseline 3 and 4 (CGs 59-73) ships budgeted under OPN BLI 0960 (Cruiser Modernization); DDG51 Class Flight I/II (DDGs 51-78) ships budgeted under OPN BLI 0900 (DDG Modernization) and OPN BLI 2136 (represented here); and DDG 51 Class Flight IIA and onward via OPN BLI 2136 (for DDGs 79-132 represented here) and SCN BLI 2122 (DDG51 Class Forward Fit for DDGs 133 and follow). The AN/SQQ-89A(V)15 upgrade, developed under the RDT&EN Program Element (PE) 0205620N Project 1916 Surface ASW System Improvement program, capitalizes on previously fielded AN/SQQ-89(V) systems. The AN/SQQ-89A(V)15 is comprised of a tactical towed array sensor, the Multi-Function Towed Array (MFTA), and replaces standard, militarized, legacy components with Commercial-Off-The-Shelf (COTS) hardware. The AN/SQQ-89A(V)15 features hull/towed Sonar Echo Tracker Classifier (ETC); hull/towed Sonar with Acoustic Intercept (ACI) fused data for significantly improved torpedo defense; Handling & Stowage Group (H&SG) for MFTA operation; Torpedo Setting Panel (TSP); passive towed array processing; common sub/surface sensor performance and prediction; common NAVAIR/Surface Light Airborne Multi-Purpose System (LAMPS) processing; portable software; integrated supportability; and on-board training via the Surface ASW Synthetic Trainer (SAST). The AN/SQQ-89A(V)15 is interoperable with AEGIS Weapons System (AWS) baselines; is Open Architecture (OA) compliant (meeting OA Level 3 requirements); provides significant reductions in weight, space, cooling, and power requirements over legacy AN/SQQ-89(V) systems; is Grade A shock qualified; supports Digital Fire Control Integration (DFCI) capability; and is integrated with the Battle Force Tactical Trainer (BFTT) and Advanced Training Domain (ATD) for integrated training. AN/SQQ-89A(V)15 Technology Insertion/Refresh and Technology Insertion/Refresh Build-In-Place via SHIPALT: To be effective against increasingly stealthy threats in an ambiguous undersea environment, future sensors must be environmentally adaptive, have very low false alarm rates, and exploit the full range of current and future submarine detection vulnerabilities. Via the Advanced Capability Build (ACB) process under RDT&EN PE 0205620N Project 1916, these types of maturing/proven USW technologies will be folded into the AN/SQQ-89A(V)15 production and future technology insertion/refresh and buildin place backfit programs. Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15. This process has proven to manage obsolescence, take advantage of commercial development efforts, and continue to pace the threat to ensure systems remain effective well into the 21st century. Additionally, studies of the submarine and surface ASW technology show that system upgrades are most critical five to nine (5 to 9) years after each AN/SQQ-89A(V)15 installation, as failure rates within this period begin to rise. Establishing a stable technology refresh program ensures the Fleet maintains critical Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These installation costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. An average, aggregate AN/SQQ-89A(V)15 shipset unit cost is comprised of multiple contract/funding vehicles. Additionally, these unit costs can vary as they are dependent on the pre-existing legacy AN/ SQQ-89(V) configuration of each ship. 2. Aircraft Carrier Tactical Support Center (CV-TSC) (Cost Code DB301): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), the AN/SQQ-34 Aircraft Carrier Tactical Support Center (CV-TSC) program delivers Anti-Submarine Warfare (ASW) and Surface Warfare (SUW) combat capability to the Aircraft Carrier supporting Aircraft Carrier, Nuclear power (CVN) Tactical Action Office (TAO) and embarked Carrier Strike LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 2 of 38 P-1 Line #39 Volume 2 - 10 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A Group (CSG) Sea Combat Commander. The program provides validation and certification of Engineering Changes (ECs) fielded on CVNs and provides hardware/software changes/upgrades developed under CV-TSC RDT&EN Program Element (PE) 0603512N Project 3216 to previously fielded and in-production CV-TSC systems required to correct deficiencies identified through Fleet use, upgrade unreliable/ unsupportable components, replace obsolete components, and resolve Information Assurance (IA) issues. The program maintains interoperability with current and future interfaces to stay within the current performance envelope, supports mission data exchange, improves ASW/SUW track/sensor processing and analysis techniques, improves mission planning, improves data recording, reconstruction, and distribution, improves embedded simulation and training capabilities and implements cyber-security measures to effectively employ overall CVN Self Ship Defense System (SSDS) capabilities. CV-TSC integrates sensor data from organic Aircraft (MH-60R), organic platform sensors and tracks via Ship Self Defense System Product Line Architecture (PLA) and non-PLA, Link-16 track data, Global Command and Control System (GCCS) Over-the-Horizon track data, and Environmental and Threat Databases to assess the threat and assist the Tactical Action Officer and Carrier Strike Group to effectively employ overall CVN selfdefense capabilities. CV-TSC generates real-time ASW/SUW information and recommendations, tactical planning and employment of ASW/SUW assets, ASW/SUW sensor data processing and analysis, and distribution of tactically significant data. Aircraft supported include: MH-60R/S Seahawk, P-8 Poseidon, MQ-4C Triton, and future ASW/SUW non-organic supporting platforms. 3. Sonar Dome Rubber Window (SDRW) (Cost Code DB401): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), AN/SQS-53 Sonar Dome Rubber Windows (SDRWs) are installed on all CG47 and DDG51 class ships (Initial Capabilities Document (ICD) for ASW, AN/SQQ-89(V) Operational Requirements Document (ORD) (#667-76-05 dated August 2005). This program provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, fatigue, and impact damage. Ships with a severely damaged SDRW need to be drydocked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced self-noise and by providing increased source level receiving and sensitivity resulting from reduced attenuation. This program provides production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments of production systems and field service engineering; and completion of engineering design work and material tests. This program also provides drawings, configuration management information, incorporation of new design and fabrication technology, incorporation of lessons learned and required testing, and constructs sub-elements to confirm single-stage cure of the SDRW production process. 4. Undersea Warfare Decision Support System (USW-DSS) (Cost Code DB601): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), USW-DSS is the Navy Program of Record ASW Command and Control (C2) NetCentric system supporting the warfighter. USW-DSS provides an integrated, near-real time, net-centric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) for the Sea Combat Commander (SCC) and Theater USW Commander (TUSWC) in support of theater, group, and independent destroyer squadron (DESRON) operations. USW-DSS enables effective planning and execution of Undersea Warfare (USW) operations, optimizes placement of sensors for exploitation of the environment, manages available resources, balances operations versus risk, and provides a clear vulnerability assessment of the operational environment. USW-DSS shortens C2 decision processes for detection-to-engagement across multiple platforms, including those with low bandwidth communications or intermittent connectivity. Tactical data such as tracks, environmental, and sensor processing data is ingested into USW-DSS through platform specific interfaces such as the AN/SQQ-89(V) Surface Ship ASW Combat System, the Global Command and Control System - Maritime (GCCS-M), and Aircraft Carrier Tactical Support Center (CV-TSC), and the Joint Range Extension Protocol - Combat (JREAP-C). USW-DSS processes this tactical data along with a series of tactical decision aids, probability-based assessment tools, and data fusion and data quality analytics to support intelligent dissemination of offensive and defensive USW missions. USW-DSS capability improvements are phased to deliver timely and cost-effective software improvements to the warfighter via the Build / Fleet Capability Release (FCR) process funded under the USWDSS RDT&EN Program Element (PE) 0604518N/0603561N Project 3094 development program, for transition and fielding via the USW-DSS OPN BLI 2136 program. USW-DSS procurements are installed at shore nodes and on Carrier Strike Group (CSG) platforms (CVNs, CGs, and DDGs) via permanent Ship Alterations (SHIPALTs). USW-DSS processing software is virtualized for portability and is hosted on Consolidated Afloat Networks and Enterprise Services (CANES) systems and implements a Service-Oriented Architecture (SOA) with display generation and operator interfaces provided via USW-DSS hardware. For support and ashore nodes, USW-DSS processing software is hosted on Commercial-Off-The-Shelf (COTS) hardware. USW-DSS shore nodes include: five (5) Theater Undersea Warfare Operations Centers (TUSWOC), six (6) Submarine Broadcast Control Authority (BCA) nodes at secret and Top Secret classification levels, two (2) SSBN strategic operations centers, one (1) Undersea unmanned operations LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 3 of 38 P-1 Line #39 Volume 2 - 11 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A center, two (2) Naval Oceanographic Office (NAVO) / Naval Oceanographic Operations Centers (NOOC), two (2) Information warfare training detachments, five (5) system trainers, and on six (6) DevSecOps development, testing, and production systems. Enterprise-wide upgrades to computational and memory hardware effectively doubled the quantity of systems at each TUSWOC, increasing the number of shore nodes to support to 34. See the following for a description of all P-40a and P-3a cost items that comprise this budget: [P40A / DB400 - DDG51 CLASS SYSTEM COMPONENTS - SQQ-89A(V)15]: DB400 Cost Elements/Descriptions as Follows: [P40A / AN/SQQ-89 System Updates (Non Recurring Engineering)]: Item Number 1.1 - Consists of the NRE efforts associated with technology refresh/replacement of legacy AN/SQQ-89(V) equipment with an updated system architecture and updated Commercial-Off-The-Shelf (COTS) processors, including material procurement, fabrication, and integration of Government Furnished Property (GFP), as performed by the prime contractor. Hardware reviews will be conducted on an annual basis to determine if architecture and hardware changes are warranted based on COTS obsolescence and to identify applicable stateof-the-practice hardware components. NRE efforts are also performed to integrate Advanced Capability Builds (ACBs) with the designed hardware updates. This line also includes start-up/transition funding required for the AN/SQQ-89(V) prime in the first year of each new production/design agent contract. [P40A / AN/SQQ-89 Engineering Changes (ECs): Software]: Item Numbers 1.2, 1.3, 1.4 - Consists of Engineering Changes (ECs) to implement software and hardware modifications to in-production and fielded AN/SQQ-89A(V)15 Surface Ship ASW Combat Systems. ECs lines include the additional integration, procurement, and installation funding required to replace obsolete components, backfit Advanced Capability Build (ACB) software releases, and address fleet wide critical inoperability issues including the Time Roll Over (TRO) of UNIX and time control software no later than Calendar Year (CY) 2036 and CY2038. Updates to ACB software and Commercial-Off-The-Shelf (COTS) hardware components are managed as part of a Continuous Integration/Continuous Delivery (CI/CD) approach, mitigating hardware and software obsolescence concerns associated with: 1) the Surface Ship DDG51 class transition to a Six (6) Year Dry-Docking availability cadence for Continental United States (CONUS) and Hawaii ports, which limits the frequency of AN/SQQ-89A(V)15 Technology Insertion/Refresh Build-in-Place Ship Alterations (SHIPALTs), and, 2) the inoperability of AN/SQQ-89 A(V)15 systems in CY2036 and CY2038. Addressing obsolete systems in-between scheduled AN/SQQ-89A(V)15 Technology Insertion/Refresh Build-in-Place SHIPALTs will minimize obsolescence issues, maintain high Operational Availability (Ao), and keep pace with the threat until the next major AN/SQQ-89A(V)15 Build-in-Place SHIPALT is conducted. [P40A / AN/SQQ-89 Engineering Changes (ECs): Software]: Item Number 1.2 - Funding to develop and productize CY2036/CY2038 UNIX Time Roll Over fixes, cybersecurity mitigations, and high priority Fleet Incident Reports (IRs) into the ACB software of the AN/SQQ-89A(V)15 Surface Ship ASW Combat System. ACB-19 will be updated to modernize QTY 30 In Service platforms and ACB-23 will be updated to modernize QTY 72 In Service platforms. These ACB-19 and ACB-23 updates address the inoperability of AN/SQQ-89 A(V)15 systems in CY2036 and CY2038 and proactively increase the level of complexity for an adversary to develop and employ cyber exploits against the AN/SQQ-89A(V)15 (rather than reactively patching software after a cyber threat is detected). In FY 2028, additional funding is specifically required to update AN/SQQ-89A(V)15 ACB baselines in support of the Service Life Extension (SLE) to select DDG51 Class FLT I hulls. [P40A / AN/SQQ-89 Engineering Changes (ECs): Hardware]: Item Number 1.3 - Funding to support efforts associated with the changing COTS environment as well as Reliability, Maintainability, and Availability (RM&A) modifications requested by the Fleet; correct deficiencies identified through Fleet use; upgrade unreliable components; replace obsolete components; and correct design errors found during testing. Funding to procure hardware changes and COTS upgrade components to address shifts in technology, replace unreliable and obsolete components, and correct design errors, for up to QTY 72 In Service platforms that have previously received an AN/SQQ-89A(V)15 Technology Insertion/Refresh/Build-In-Place Ship Alteration (SHIPALT) four (4) to six (6) years prior. Funding is also specifically required to procure AN/SQQ-89A(V)15 system COTS components in support of the Service Life Extension (SLE) to select DDG51 Class FLT I hulls. [P40A / AN/SQQ-89 Engineering Changes (ECs): Shipyard Install Industrial Supt]: Item Number 1.4 - Funding to install and backfit modernized AN/SQQ-89A(V)15 ACB configurations with CY2036 and CY2038 UNIX Time Roll Over fixes, improved cyber mitigations and COTS HW upgrade components. Platforms that received an AN/SQQ-89A(V)15 Technology Insertion/Refresh/Build-In-Place Ship Alteration (SHIPALT) four (4) to six (6) years prior are targeted for an upgrade installation. In FY 2028 and follow, additional installations of a common AN/SQQ-89A(V)15 USW Combat Systems will be performed to improve warfighter readiness, reduce training deltas, and maintain high Ao. Additionally in FY 2028, additional funding is specifically required to install AN/SQQ-89A(V)15 ACB software and hardware COTS components in support of the Service Life Extension (SLE) to DDG51 Class FLT I hulls. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 4 of 38 P-1 Line #39 Volume 2 - 12 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A [P40A / AN/SQQ-89 Integrated Logistics Support (ILS)]: Item Number 1.5 - Funding is provided for all ILS planning and coordination elements associated with every AN/SQQ-89A(V)15 modification/procurement/ installation, including: configuration management and control of the hardware and software associated with each modification such as Maintenance and Material Management (3M); planned and corrective maintenance procedures and drawings; supporting the procurement of upgrades to Technical Training Equipment (TTE) for shore training sites; changes to maintenance concepts and associated updates to technical documentation, such as technical manuals; development of revisions to both operator and maintenance training materials as part of the initial training curriculum development; revisions to the Navy Training System Plan; initial conduct of instructor training (train-the-trainer) until such time that the training community assumes the responsibility; modifications to supply support related provisioning data and identification of related changes to Allowance Parts Lists (APLs) and Program Support Data (PSD) spares procurement lists; and Packaging, Handling, Storage and Transportation (PHST) support during the procurement, Installation and Checkout (INCO), and testing stages of the AN/SQQ-89A(V)15 to meet evolving capabilities. [P40A / AN/SQQ-89 AEGIS Integration Events (AIE)]: Item Number 1.6 - Recurring engineering support services associated with AN/SQQ-89A(V)15 Surface Ship ASW Combat System equipment at the Surface Combatant Systems Center (SCSC) Wallops Island, VA test facility to support land-based testing, external interface testing, and AEGIS Integration Event (AIE) production systems testing for interoperability risk reduction analysis purposes as necessary to certify that each incremental AN/SQQ-89A(V)15 hardware/software build is compatible with multiple AEGIS Weapons System (AWS) baselines prior to installation. [P40A / AN/SQQ-89 Combat Systems Ship Qualification Trials (CSSQTs)]: Item Number 1.7 - CSSQTs are required per Naval Sea Systems Instruction 90963.1C for all ships undergoing significant conversion/ modernization availabilities. CSSQTs consist of a series of at-sea exercises and tests to verify/certify the AN/SQQ-89A(V)15 or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place system has been installed properly and can be operated and maintained safely and effectively. CSSQTs follow every AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA first-of-its-kind or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place installation. CSSQT costs are dependent on the number, scope, and complexity of CSSQTs planned per Fiscal Year. CSSQTs planned for AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA systems are higher in cost, scope and complexity than those for AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place systems. FY 2027 costs are broken down as follows: - In FY 2027 ($13.063M in total), thirteen CSSQTs are planned to follow AN/SQQ-89A(V)15 Technology Refresh installs at $1.005M per CSSQT = $13.063M. [P40A / AN/SQQ-89 Follow-On Operational Test & Evaluation (FOT&E)]: Item Number 1.8 - Represents the final independent test of each new increment of the AN/SQQ-89A(V)15 Advanced Capability Build (ACB) production baseline. Follow-On Operational Test & Evaluation (FOT&E) events are conducted to ensure each new increment meets the operational effectiveness and suitability requirements for each new incremental AN/SQQ-89A(V)15 ACB production baseline, as well as its readiness and performance goals. FOT&E costs are primarily biennial driven and dependent on the scope and complexity of the next new AN/SQQ-89A(V)15 ACB production baseline release being tested. FY 2027 costs are broken down as follows: - In FY 2027, funding ($1.800M) is required to conduct an FOT&E event on the next new AN/SQQ-89A(V)15 ACB production baseline release. [P40A / AN/SQQ-89 Fleet ASW Training Center (FLTASWTRACEN)]: Item Number 1.9 - Upgrade and virtualization of AN/SQQ-89A(V)15 training equipment for the Fleet ASW Training Center, San Diego, CA. Training system improvements are a critical factor in achieving warfighter competencies and mission readiness. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) baselines and to implement Fleet prioritized warfighting training improvements to meet evolving capabilities. FLTASWTRACEN costs are primarily biennial driven and are dependent on the scope and complexity of training equipment to be upgraded. FY 2027 costs are broken down as follows: - In FY 2027, there is no requirement to upgrade the equipment at the Fleet ASW Training Center. [P40A / AN/SQQ-89 Surface Ship Engineering Site (SSES)]: Item Number 1.10 - Procurement of AN/SQQ-89A(V)15 equipment for land-based sites, including the SSES at the AN/SQQ-89(V) prime vendor's facility, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit AN/SQQ-89A(V)15 Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) production baselines. SSES costs are primarily biennial driven, and dependent on the scope and complexity of shore site equipment production to be upgraded. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 5 of 38 P-1 Line #39 Volume 2 - 13 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A FY 2027 costs are broken down as follows: - In FY 2027, there is no requirement to upgrade the equipment at the SSES land-based site. [P40A / AN/SQQ-89 Surface Combatant Systems Center (SCSC)]: Item Number 1.11 - Procurement of AN/SQQ-89A(V)15 equipment for land-based sites including the Surface Combatant Systems Center (SCSC) at Wallops Island, VA, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) productions baselines. SCSC Wallops costs are primarily biennial driven and dependent on the scope and complexity of shore site equipment to be upgraded. FY 2027 costs are broken down as follows: - In FY 2027, funding ($2.095M) is required to upgrade the equipment at the SCSC Wallops Island land-based site. [P40A / AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment]: Item Number 1.12 - Procurement of Multi-Function Towed Array (MFTA) full module sets required for expeditious replacement in the event of major damage (the MFTA is considered a principal item, and its loss could render the system inoperable). The MFTA is a key component of the AN/SQQ-89A(V)15 Surface ASW Combat System upgrade and enables ships to have active bi-statics, Continuous Active Sonar (CAS), adaptive beamforming, passive bellringers, and the use of new sensors for advanced torpedo detection. [P40A / DB830 - PRODUCTION ENGINEERING - SQQ-89A(V)15]: DB830 Cost Element/Description as Follows: [P40A / AN/SQQ-89 Production Engineering]: Item Number 2.1 - Funding is for AN/SQQ-89A(V)15 program In-Service Engineering Agent (ISEA), Software Support Activity (SSA), Acquisition Engineering Agent (AEA), and Technical Design Agent (TDA) efforts in performing the following functions: writing of contracts; review and evaluation of production design data, documentation and Contract Data Requirements Lists (CDRLs); letting of production contract awards; on-site engineering support at the prime integrator's facility; production configuration control and quality assurance (Production Inspection Test (PIT) and Production Reliability Acceptance Test (PRAT)); witnessing of segment/system integration tests and preparation of reports; conduct of first article and factory acceptance tests; collection of performance metrics; generation/assessment of Software Problem Reports (SPRs) and coordination with vendors; value and maintenance engineering; coordination with AEGIS regarding interface definition and ship integration; support safety review and AEGIS Integration Events (AIE); provide plans, procedures and inputs to support Information Assurance (IA) mandates; provide status reports and technical briefings; support meetings with program office; and all other production support efforts directly related to delivery of AN/SQQ-89A(V)15 software and hardware. [P40A / DB900 - CONSULTING SERVICES - SQQ-89A(V)15]: DB900 Cost Element/Description as Follows: [P40A / AN/SQQ-89 Consulting Services]: Item Number 3.1 - Funding to provide assistance in the following areas: program and financial management; system specification validation; production planning; business case and market analyses; vendor cost, schedule, performance, production, and contract deliverable monitoring; installation planning and coordination; Integrated Logistics Support (ILS) asset management, planning, documentation, and coordination; and evaluation of Engineering Change Proposals (ECPs). [P40A / DB301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC)]: DB301 Cost Element/Description as Follows: [P40A / CV-TSC Technology Insert/ Refresh & ECP Implementation]: Item Number 4.1 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades to previously fielded and in-production CV-TSC AN/SQQ-34 systems. Funding used to implement ECPs to correct deficiencies identified through Fleet use; upgrade unreliable components; replace obsolete components; and address Information Assurance (IA) issues. [P40A / DB401 - SONAR DOME RUBBER WINDOW (SDRW)]: DB401 Cost Element/Description as Follows: LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 6 of 38 P-1 Line #39 Volume 2 - 14 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A [P40A / SDRW Procurement]: Item Number 5.1 - Procure SDRWs, shipping fixtures, and fairing angles for emergency replacement on all CG47 and DDG51 class hulls. This line provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, fatigue, and impact damage. Ships with a severely damaged SDRW need to be dry-docked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. [P40A / SDRW Production Support]: Item Number 5.2 - Funding is provided for production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments, and field service engineering; and complete engineering design work and material tests. This program also provides drawings, configuration management information, new design and fabrication technology, incorporation of lessons learned and required testing, and construct sub-elements to confirm single-stage cure. [P40A / DB601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS)]: DB601 Cost Element/Description as Follows: [P40A / USW-DSS Shore Sites and Tactical Trainers]: Item Number 6.1 - Reflects the procurement of USW-DSS at Theater USW operations centers, submarine broadcast control authorities, Undersea Unmanned Vehicle Operations Centers, tactical operations centers, maritime operations centers, and support sites such as Naval Oceanographic Office, and Naval Oceanographic Operations Center. Shore sites also include DevSecOps development and testing systems as well as tactical training environments. Systems are hosted via controlled unclassified, general services secret and top-secret networks. Systems consist of the necessary computational hardware, servers, network architecture, software, user licenses and workstations to support from 2-10 simultaneous users. Multiple Systems can be configured at one site in an A-B architecture to allow for simultaneous operations and maintenance, as well as continuity of operations between sites. [P40A / USW-DSS Tech Refresh]: Item Number 6.2 - Tech Refreshes are defined as hardware component upgrades and software baseline upgrades to existing USW-DSS systems and include upgrades to both afloat and ashore systems. Through USW-DSS Tech Refreshes, targeted architecture improvements developed under USW-DSS RDT&EN Program Element 0604518N/0603561N Project 3094 via Build 3 Fleet Capability Release (FCR) will facilitate the migration of key components of USW-DSS onto existing installed systems for Fleet use. USW-DSS Tech Refreshes will include the latest cybersecurity patches, mitigate/resolve obsolescence issues, and improve software scalability, while installing the latest integrated, near-real time, netcentric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) on an electronic Master Tactical Plot (eMTP). Each year, USW-DSS is required to perform Tech Refreshes for afloat B2R3 systems to stay compatible with the Consolidated Afloat Network and Enterprise Services (CANES) hosting environment when CANES undergoes system upgrades to prevent loss of functionality. USW-DSS systems previously installed on CVNs and DDGs will undergo a tech refresh to the Build 3 upgraded baseline. Each year, USW-DSS Build 3 ashore systems at Theater USW Command Headquarters (TUSWCHQ) sites are updated to provide additional capability, bug fixes, and cybersecurity upgrades. [P40A / USW-DSS Engineering Changes (ECs)]: Item Number 6.3 - Consists of Engineering Changes (ECs) that result in USW-DSS system upgrades, patches, and system documentation improvements. Funding will be used to support integration of Reliability, Maintainability & Availability (RM&A) modifications, correct deficiencies identified through Fleet use, and replacement of unreliable or obsolete components. [P40A / USW-DSS System Technical Support]: Item Number 6.4 - Funding is for USW-DSS program Software Support Activity (SSA) efforts in performing the following functions: generation/assessment of Software Problem Reports (SPRs)/Software Trouble Reports (STRs); responding to Fleet software change requests; Configuration Management (CM); software Quality Assurance (QA); software installation automation; and software recovery support. Funding is also used to manage the documentation, triage, adjudication development and testing of system upgrades, and manage changes to system interfaces and data formats that may impact system operation. [P40A / USW-DSS Production Support]: Item Number 6.5 - Consists of on-site engineering support; Consolidated Afloat Network and Enterprise Services (CANES) Integrated Product Team (IPT) Support; Information Assurance (IA) certification support; production quality assurance; system sustainability support; Integrated Logistics Support (ILS) product updates/support; status reporting and technical briefings; program office support; and all other production support efforts directly related to delivery of USW-DSS to the CANES systems, and ultimately to the Fleet. Funding also supports the management of DevSecOps environments in support of system integration and production. [P40A / USW-DSS Theater ASW (TASW) Build Out]: Item Number 6.6 - Consists of the fielding of the USW-DSS Build 3 baseline loaded on Consolidated Afloat Network and Enterprise Services (CANES) equipped ships that did not have USW-DSS previously installed. Hosting USW-DSS Build 3 on the CANES shipboard network reduces hardware costs while improving system sustainment. This line also reflects LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 7 of 38 P-1 Line #39 Volume 2 - 15 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A the additional requirement to upgrade legacy USW-DSS Build 2 Revision 3 (B2R3) systems to the Build 3 baseline, when CANES architecture does not allow full software-only fielding. The USW-DSS Build 3 system is more complex and incorporates additional tactical data links than the legacy B2R3 baseline. Build 3 data is shared at the general services Secret and Top-Secret level, creating additional complexity. This expanded list of tactical data allows for better communication and expanded data fusion for ship-to-ship, ship-to-shore, shore-to-shore, and shore-to-aircraft information sharing. These added tactical data links require additional effort to establish and validate during system delivery. [P3A / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT)]: See the following: AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on all DDG79-112 Flight IIA ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE]: See the following: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on select DDG51-78 FLT I/II ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A - 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT)]: See the following: AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of a subset of AN/SQQ-89A(V)15 equipment, specifically the Multi-Function Towed Array (MFTA) and OK-410 Handling & Stowage Group (H&SG), for subsequent installation on all DDG113-132 ships during their Post Delivery Availability (PDA) or Post Shakedown Availability (PSA) periods, to upgrade the ASW sonar suite from an AN/SQQ-89(V)15 configuration to the AN/SQQ-89A(V)15 configuration. AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Physical installation of the MFTA and OK-410 H&SG on DDG113-132 ships during their PDA or PSA period which includes the installation of an egress, under-deck stiffeners, cables, bulkheads, opening and closing of the transom, the winch, levelwind, fairlead and control station, decking, painting, and final system testing, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A - 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT)]: See the following: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/ SQQ-89A(V)15 with a Technical Insertion-12 (TI-12+) production baseline configuration or lower (TI-09 through TI-12+). These technology insertion/refreshes have proven to minimize COTS obsolescence LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 8 of 38 P-1 Line #39 Volume 2 - 16 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Anti-Submarine Warfare Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor and Infrastructure as a Service (IaaS) technology advancement hardware/software. Hypervisor allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. Hypervisor also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. Unlike the Build-In-Place (BIP) technology refresh planned for AN/SQQ-89A(V)15 TI-14 and follow production baselines, the TI-12+ and prior production baselines will also require the procurement of new equipment racks to host the Hypervisor and IaaS technology advancements. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the physical installation of the AN/SQQ-89A(V)15 Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and the Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. NOTE: Physical installation costs shown factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. [P3A - 5 / AN/SQQ-89A(V)15 - TECH INSERTION/REFRESH BUILD-IN-PLACE (SHIPALT)]: See the following: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh - Build-In-Place program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15 with a Technology Insertion-14 (TI-14) production baseline configuration or higher. These technology insertion/refreshes have proven to minimize COTS obsolescence issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Ship ASW Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor and Infrastructure as a Service (IaaS) technology advancement hardware/software. Hypervisor allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. Hypervisor also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. AN/SQQ-89A(V)15 TI-14 and above production baselines have a consistent architecture and similar configuration which allows a similar strategy that submarine Acoustic Rapid Commercial Off The Shelf (COTS) Insertion (ARCI) programs employ in order to retain equipment racks and upgrade processing, storage, and network capacity onboard the platform during installation. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the physical installation of the AN/SQQ-89A(V)15 Build-InPlace Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. Physical installation costs shown factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of- LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 9 of 38 P-1 Line #39 Volume 2 - 17 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 10 of 38 P-1 Line #39 Volume 2 - 18 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM P-3a 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) (Warfighting Capability) P-3a 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) (Warfighting Capability) P-3a 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) (Warfighting Capability) P-3a 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) (Warfighting Capability) P-3a 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) (Warfighting Capability) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Title* FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,541.612 - / 33.860 - / 51.809 - / 48.001 - / 495.328 - / 0.000 - / 0.000 - / 0.000 - / 182.278 - / 9.093 - / 0.000 - - / 151.225 - / 4.127 - / 3.704 - / 313.332 - / 21.419 - / 10.713 - Exhibits Schedule Exhibit Type Prior Years Subexhibits ID CD MDAP/ MAIS Code - / - - / 48.001 - / 0.000 - / 0.000 / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 10.928 - / 0.000 - / 10.928 / 61.908 - / 66.136 - / 78.199 - / 83.426 - / 0.000 - / 83.426 / 2,745.683 - / 134.635 - / 144.425 - / 142.355 - / 0.000 - / 142.355 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM P-3a 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) (Warfighting Capability) P-5a - / - - / - - / - - / - - / - - / - - / 1.369 - / 6.801 - / 0.000 - / 0.000 - / 0.000 - / 503.498 P-3a 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) (Warfighting Capability) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 191.371 P-3a 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) (Warfighting Capability) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 159.056 P-3a 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) (Warfighting Capability) - / 11.146 - / 4.542 - / 4.358 - / 0.000 - / 0.000 - / 376.438 P-3a 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) (Warfighting Capability) - / 67.211 - / 67.673 - / 71.653 - / 74.289 P-40 Total Gross/Weapon System Cost - / 156.022 - / 159.709 - / 158.800 - / 159.093 Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: AN/SQQ-89 - The FY 2027 budget request supports the technology refresh of previously fielded AN/SQQ-89A(V)15-equipped ships across all DDG 51 Class platforms to pace the threat and remain effective well into the 21st century. CV-TSC - The FY 2027 budget request supports the technology refresh of previously fielded systems to correct deficiencies identified through Fleet use, upgrade unreliable components, replace obsolete components, and address Information Assurance (IA) issues. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 11 of 38 P-1 Line #39 Volume 2 - 19 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Program Elements for Code B Items: N/A Other Related Program Elements: 0205620N, 0603512N, 0603553N, 0603561N, 0604518N Line Item MDAP/MAIS Code: N/A SDRW - The FY 2027 budget request supports the procurement of emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware necessary to maintain a ready inventory of replacement assets to ensure uninterrupted performance of the ASW mission on all CG47 and DDG51 Class platforms. USW-DSS - The FY 2027 budget request supports the procurement of shore sites and tactical trainers, namely additional capacity and redundancy at the Naval Oceanographic Operations Center, SSBN strategic operations centers, and the Unmanned Undersea Vehicle Squadron (UUVRON) TWO in Norfolk, VA. FY 2027 will provide for technology refresh of software at each shore node to the CD 26.x baseline(s) as well as software-only upgrades on several CVNs and DDGs to deliver timely and cybersecure software improvements to the warfighter. The FY 2027 budget request also includes the procurement and installation of USW-DSS Build 3 for software-only hosting on Consolidated Afloat Network and Enterprise Services (CANES) equipped ships to include CVNs and DDGs. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 12 of 38 P-1 Line #39 Volume 2 - 20 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years FY 2025 MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) DB400 - DDG51 CLASS SYSTEM COMPONENTS - SQQ-89A(V)15 1.1) AN/SQQ-89 System Updates (Non Recurring Engineering) A 1.2) AN/SQQ-89 Engineering Changes (ECs): Software A 1.5) AN/SQQ-89 Integrated Logistics Support (ILS) A 1.6) AN/SQQ-89 AEGIS Integration Events (AIE) A 1.7) AN/SQQ-89 Combat Systems Ship Qualification Trials 1.8) AN/SQQ-89 Follow-On Operational Test & Evaluation (FLTASWTRACEN) - - 1.739 - - 1.774 - - 1.809 - - - - - 1.809 - - 1,136.557 - - 4.255 - - 4.340 - - 4.427 - - - - - 4.427 - - 62.084 - - 3.384 - - 3.452 - - 3.521 - - - - - 3.521 - - 38.929 - - 3.011 - - 2.028 - - 2.069 - - - - - 2.069 - - 78.539 - - 8.370 - - 12.806 - - 13.063 - - - - - 13.063 - - 12.881 - - 2.307 - - - - - 1.800 - - - - - 1.800 - - 9.500 - - - - - 1.117 - - - - - - - - - - - 22.941 - - - - - 1.373 - - - - - - - - - - - 9.576 - - 1.437 - - - - - 2.095 - - - - - 2.095 21.172 4,565K 4.565 4,656K 4.656 - - - - - - - - - - 1,421.226 - - 29.068 - - 31.546 - - 28.784 - - - - - 28.784 - 92.107 - - 3.445 - - 3.516 - - 3.587 - - - - - 3.587 A A (3) 1.10) AN/SQQ-89 Surface Ship Engineering Site A (4) 1.11) AN/SQQ-89 Surface Combatant Systems Center (SCSC) 29.047 (2) 1.9) AN/SQQ-89 Fleet ASW Training Center (SSES) - (1) (CSSQTs) (FOT&E) - A (5) 1.12) AN/SQQ-89 Multi-Function Towed Array (MFTA) Major A 4,234K 5 1 1 (†) Equipment Subtotal: 1) DB400 - DDG51 CLASS SYSTEM COMPONENTS SQQ-89A(V)15 - 2) DB830 - PRODUCTION ENGINEERING - SQQ-89A(V)15 2.1) AN/SQQ-89 Production Engineering A - LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 13 of 38 P-1 Line #39 Volume 2 - 21 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Subtotal: 2) DB830 - PRODUCTION ENGINEERING - SQQ-89A(V)15 Unit Cost ($) - Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - 92.107 - - 3.445 - - 3.516 - - 3.587 - - - - - 3.587 - - 28.279 - - 1.347 - - 1.100 - - 0.771 - - - - - 0.771 - - 28.279 - - 1.347 - - 1.100 - - 0.771 - - - - - 0.771 3) DB900 - CONSULTING SERVICES - SQQ-89A(V)15 3.1) AN/SQQ-89 Consulting Services A Subtotal: 3) DB900 - CONSULTING SERVICES - SQQ-89A(V)15 4) DB301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC) 4.1) CV-TSC Technology Insert/ Refresh & ECP Implementation A Subtotal: 4) DB301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC) - - - - - - - - 0.381 - - 0.355 - - - - - 0.355 - - 0.000 - - - - - 0.381 - - 0.355 - - - - - 0.355 - - - - - - 2,603K 2.603 2,658K 2.658 - - - 2,658K - - - - - - - - 0.427 - - 0.436 - - - - - 0.436 - - 0.000 - - - - - 3.030 - - 3.094 - - - - - 3.094 5) DB401 - SONAR DOME RUBBER WINDOW (SDRW) 5.1) SDRW Procurement (†) 5.2) SDRW Production Support A A Subtotal: 5) DB401 - SONAR DOME RUBBER WINDOW (SDRW) 1 1 1 2.658 6) DB601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) 6.1) USW-DSS Shore Sites and Tactical A - - - - - - 726,578.00 3 2.180 741,836.00 4 2.967 - - - 741,836.00 4 2.967 - - - - - - 142,566.00 29 4.134 146,560.00 25 3.664 - - - 146,560.00 25 3.664 - - - - - - - - 1.076 - - 1.098 - - - - - 1.098 - - - - - - - - 1.517 - - 1.550 - - - - - 1.550 - - - - - - - - 1.061 - - 1.028 - - - - - 1.028 - - - - - - 21 2.268 110,282.00 10 1.103 - - - 10 1.103 Subtotal: 6) DB601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) - - 0.000 - - - - - 12.236 - - 11.410 - - - - - 11.410 Total - - 1,541.612 - - 33.860 - - 51.809 - - 48.001 - - - - - 48.001 (†) Trainers 6.2) USW-DSS Tech (†) A Refresh 6.3) USW-DSS Engineering Changes (ECs) A 6.4) USW-DSS System Technical Support A 6.5) USW-DSS Production Support A 6.6) USW-DSS Theater ASW (TASW) A (†) Build Out LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 108,014.00 UNCLASSIFIED Page 14 of 38 P-1 Line #39 110,282.00 Volume 2 - 22 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Aggregated Items Title: AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Item Number 1.7 - AN/SQQ-89 Combat Systems Qualifications Trials (CSSQTs): CSSQTs are required per Naval Sea Systems Instruction 90963.1C for all ships undergoing significant conversion/modernization availabilities. CSSQTs consist of a series of at-sea exercises and tests to verify/certify the AN/SQQ-89A(V)15 or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place system has been installed properly and can be operated and maintained safely and effectively. CSSQTs follow every AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA first-of-its-kind or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place installation. CSSQT costs are dependent on the number, scope, and complexity of CSSQTs planned per Fiscal Year. CSSQTs planned for AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA systems are higher in cost, scope and complexity than those for AN/SQQ-89A(V)15 Technology Refresh/Build-InPlace systems. In FY 2027 ($13.063M in total), thirteen CSSQTs are planned to follow AN/SQQ-89A(V)15 Technology Refresh installs at $1.005M per CSSQT = $13.063M. (2) Item Number 1.8 - AN/SQQ-89 Follow-On Operational Test & Evaluation (FOT&E): Represents the final independent test of each new increment of the AN/SQQ-89A(V)15 Advanced Capability Build (ACB) production baseline. Follow-On Operational Test & Evaluation (FOT&E) events are conducted to ensure each new increment meets the operational effectiveness and suitability requirements for each new incremental AN/SQQ-89A(V)15 ACB production baseline, as well as its readiness and performance goals. FOT&E costs are primarily biennial driven and dependent on the scope and complexity of the next new AN/SQQ-89A(V)15 ACB production baseline release being tested. In FY 2027, funding ($1.800M) is required to conduct an FOT&E event on the next new AN/SQQ-89A(V)15 ACB production baseline release. (3) Item Number 1.9 - AN/SQQ-89 Fleet ASW Training Center (FLTASWTRACEN): Upgrade and virtualization of AN/SQQ-89A(V)15 training equipment for the Fleet ASW Training Center, San Diego, CA. Training system improvements are a critical factor in achieving warfighter competencies and mission readiness. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) production baselines and to implement Fleet prioritized warfighting training improvements to meet evolving capabilities. FLTASWTRACEN costs are primarily biennial driven and are dependent on the scope and complexity of training equipment to be upgraded. In FY 2027, there is no requirement to upgrade the equipment at the Fleet ASW Training Center. (4) Item Number 1.10 - AN/SQQ-89 Surface Ship Engineering Site (SSES), AN/SQQ-89(V) Prime Vendor's Facility): Procurement of AN/SQQ-89A(V)15 equipment for land-based sites, including the SSES at the prime vendor's facility, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit AN/SQQ-89A(V)15 Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) production baselines. SSES costs are primarily biennial driven and dependent on the scope and complexity of shore site equipment to be upgraded. In FY 2027, there is no requirement to upgrade the equipment at the SSES land-based site. (5) Item Number 1.11 - AN/SQQ-89 Surface Combatant Systems Center (SCSC), Wallops Island, VA): Procurement of AN/SQQ-89A(V)15 equipment for land-based sites including the Surface Combatant Systems Center (SCSC) at Wallops Island, VA, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) production baselines. SCSC Wallops costs are primarily biennial driven and dependent on the scope and complexity of shore site equipment to be upgraded. In FY 2027, funding ($2.095M) is required to upgrade the equipment at the SCSC Wallops Island land-based site. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 15 of 38 P-1 Line #39 Volume 2 - 23 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Contractor and Location Method/Type or Funding Vehicle Aggregated Items: AN/SQQ-89(V) SURFACE ASW COMBAT SYSTEM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) DB400 - DDG51 CLASS SYSTEM COMPONENTS - SQQ-89A(V)15 1.12) AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment 2022 Lockheed Martin / Syracuse, NY C / FFP NAVSEA Jun 2022 Dec 2023 1 4,301K Y Mar 2018 1.12) AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment 2023 Lockheed Martin / Syracuse, NY C / FFP NAVSEA May 2023 Nov 2024 1 4,387K Y Mar 2018 1.12) AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment 2025 Lockheed Martin / Syracuse, NY C / FFP NAVSEA Jun 2025 Dec 2026 1 4,565K Y Mar 2018 1.12) AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment 2026 Lockheed Martin / Syracuse, NY C / FFP NAVSEA May 2026 Nov 2027 1 4,656K Y Jan 2025 2026 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA May 2026 May 2028 1 2,603K Y 2027 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA Mar 2027 Mar 2029 1 2,658K Y 5) DB401 - SONAR DOME RUBBER WINDOW (SDRW) 5.1) SDRW Procurement 5.1) SDRW Procurement 6) DB601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) 6.1) USW-DSS Shore Sites and Tactical Trainers 2026 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2025 Apr 2026 3 726,578.00 Y 6.1) USW-DSS Shore Sites and Tactical Trainers 2027 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2026 Apr 2027 4 741,836.00 Y 2026 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2025 Apr 2026 29 142,566.00 Y 2027 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2026 Apr 2027 25 146,560.00 Y 6.6) USW-DSS Theater ASW (TASW) Build Out 2026 NUWC/Keyport / Keyport, WA WR NAVSEA Nov 2025 Apr 2026 21 108,014.00 Y 6.6) USW-DSS Theater ASW (TASW) Build Out 2027 NUWC/Keyport / Keyport, WA WR NAVSEA Nov 2026 Apr 2027 10 110,282.00 Y 6.2) USW-DSS Tech Refresh 6.2) USW-DSS Tech Refresh LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 16 of 38 P-1 Line #39 Volume 2 - 24 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 495.328 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 495.328 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) 495.328 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 1.369 6.801 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 1.369 6.801 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 1.369 6.801 0.000 0.000 0.000 Total 503.498 503.498 503.498 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT)] See the following: AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on all DDG79-112 Flight IIA ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. NOTE 1: Due to a change in operational requirements, the previously scheduled FY 2025 AN/SQQ-89A(V)15 FLT IIA Upgrade installation on USS BAINBRIDGE (DDG-96) was rescheduled to FY 2029, which is the next availability window to accommodate the last DDG51 Class FLT IIA ship to receive this major upgrade. NOTE 2: Physical installation cost of an AN/SQQ-89A(V)15 upgrade for DDG51 Class FLT IIA ships is greater than that for DDG51 Class FLT I/II ships because the DDG51 Class FLT IIA ships require the OK-410 Handling & Stowage Group (H&SG) subsystem (whereas the OK-410 is not a requirement for the DDG51 Class FLT I/II ships due to it already being previously procured/installed as part of the legacy AN/SQQ-89(V) program). The AN/SQQ-89A(V)15 requires a CNO (Chief of Naval Operations) availability period. The installation is accomplished by Alteration Installation Team (AIT) and shipyard personnel together. The AIT personnel are responsible for the removal of all AN/SQQ-89(V) legacy equipment, addition and modification of foundations, and installation, connectorization, and test of all new AN/SQQ-89A(V)15 equipment. The LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 17 of 38 P-1 Line #39 Volume 2 - 25 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) MDAP/MAIS Code: shipyard personnel are responsible for all rigging activities, hull access cuts, and installation of the Handling & Stowage Gear (H&SG) on non-tailed (i.e. no towed array) DDG51 Class Flight IIA hulls, which is required for the operation of the tactical towed sonar, the Multi-Function Towed Array (MFTA). AN/SQQ-89A(V)15 installations are assigned to specific ships as per Fleet priorities/requirements, and based on ship availabilities, as identified in the Fleet Modernization Program Management Information System (FMPMIS). Significant maintenance availability periods to support a major upgrade such as the AN/SQQ-89A(V)15 normally occur only once every three years in a ship's schedule. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 18 of 38 P-1 Line #39 Volume 2 - 26 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) MDAP/MAIS Code: Models of Systems Affected: Upgrade of legacy AN/ SQQ-89(V) systems on all DDG79-112 ships to AN/ SQQ-89A(V)15 configuration Prior Years Related RDT&E PEs: 0205620N, 0603553N, 0603561N Modification Type: Warfighting Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/SQQ-89A(V)15 DDG79-112 FLT IIA UPGRADE (SHIPALT) B Kits Recurring 1.1.1) AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) - NonOrganic (6) Subtotal: Recurring 34 / 323.071 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 323.071 - / - - / - - / - - / - - / - - / - - / - - / - - / - 34 / 323.071 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 323.071 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 323.071 Modification Item 1 of 1: AN/SQQ-89A(V)15 DDG79-112 FLT IIA UPGRADE (SHIPALT) - / 172.257 / 0.000 - / 0.000 - / 180.427 Subtotal: Installation - / 172.257 / - - / 0.000 - / 180.427 Subtotal: AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) Subtotal: Procurement, All Modification Items - / 0.000 34 / 323.071 - / - - / 323.071 34 / 323.071 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / 1.369 - / 6.801 / - - / 1.369 - / 6.801 - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 495.328 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 19 of 38 0.000 1.369 6.801 P-1 Line #39 0.000 0.000 0.000 503.498 Volume 2 - 27 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) MDAP/MAIS Code: Modification Item 1 of 1: AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT and SHIPYARD:: Installation Name: AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 34 / 180.427 Prior Years - / - - / - - / - - / - - / - 0 / 1.369 1 / 6.801 - / - - / - 0 / 0.000 FY 2025 33 / 172.257 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.369 1 / 6.801 - / - - / - 0 / 0.000 Total 33 / 172.257 34 / 180.427 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 33 - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - 34 Out 33 - - - - - - - - - - - - - - - - - - - - - - - - - - - 34 - 1 Footnotes: (6) AN/SQQ-89A(V)15 installation funding is phased across two budget years. Performance of planning yard design tasks, ship checks, and the ordering of incidental installation material, depicted in the P-3a exhibit with a quantity of "0", are budgeted in the year *prior* to the actual physical installation of equipment. In the second budget year, costs associated with the actual physical installation of equipment on ship LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 20 of 38 P-1 Line #39 Volume 2 - 28 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE (SHIPALT) MDAP/MAIS Code: are shown with a quantity other than "0". NOTE: Due to a change in operational requirements, the previously scheduled FY 2025 AN/SQQ-89A(V)15 FLT IIA Upgrade installation on USS BAINBRIDGE (DDG-96) was rescheduled to FY 2029, which is the next availability window to accommodate the last DDG51 Class FLT IIA ship to receive this major upgrade. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 21 of 38 P-1 Line #39 Volume 2 - 29 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 182.278 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 182.278 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) 182.278 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 9.093 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 9.093 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 9.093 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 191.371 191.371 191.371 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE] See the following: AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on select DDG51-78 FLT I/II ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. NOTE: Physical installation cost of an AN/SQQ-89A(V)15 upgrade for DDG51 Class FLT I/II ships is less than that for DDG51 Class FLT IIA ships because the DDG51 Class FLT I/II ships do not require the OK-410 Handling & Stowage Group (H&SG) subsystem due to it already being previously procured/installed as part of the legacy AN/SQQ-89(V) program (whereas the OK-410 is a requirement for the DDG51 Class FLT IIA ships). The AN/SQQ-89A(V)15 requires a CNO (Chief of Naval Operations) availability period. The installation is accomplished by Alteration Installation Team (AIT) and shipyard personnel together. The AIT personnel are responsible for the removal of all AN/SQQ-89(V) legacy equipment, addition and modification of foundations, and installation, connectorization, and test of all new AN/SQQ-89A(V)15 equipment. The shipyard personnel are responsible for all rigging activities and hull access cuts. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 22 of 38 P-1 Line #39 Volume 2 - 30 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) MDAP/MAIS Code: AN/SQQ-89A(V)15 installations are assigned to specific ships as per Fleet priorities/requirements, and based on ship availabilities, as identified in the Fleet Modernization Program Management Information System (FMPMIS). Significant maintenance availability periods to support a major upgrade such as the AN/SQQ-89A(V)15 normally occur only once every three years in a ship's schedule. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 23 of 38 P-1 Line #39 Volume 2 - 31 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Upgrade of legacy AN/ SQQ-89(V) systems on select DDG51-78 ships to AN/ SQQ-89A(V)15 configuration Prior Years Financial Plan Modification Number / Title: 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) Related RDT&E PEs: 0205620N, 0603553N, 0603561N Modification Type: Warfighting Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: AN/SQQ-89A(V)15 DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) B Kits Recurring 1.1.1) AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/ II UPGRADE - NonOrganic (7) Subtotal: Recurring Subtotal: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) Subtotal: Procurement, All Modification Items 12 / 123.257 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 123.257 - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 123.257 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 123.257 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 68.114 / - - / 0.000 - / 68.114 - - / 0.000 12 / 123.257 - / - / 123.257 - 12 / 123.257 / 123.257 - Installation Modification Item 1 of 1: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) - / 59.021 - / 9.093 Subtotal: Installation - / 59.021 - / 9.093 - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 182.278 9.093 0.000 0.000 0.000 UNCLASSIFIED Page 24 of 38 0.000 0.000 0.000 P-1 Line #39 0.000 0.000 0.000 191.371 Volume 2 - 32 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) MDAP/MAIS Code: Modification Item 1 of 1: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE (SHIPALT) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT and SHIPYARD:: Installation Name: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 59.021 12 / 68.114 Prior Years 2 / 9.093 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 9.093 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 10 / 59.021 12 / 68.114 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 - - 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - 12 Out 10 - - - - - - - - - - - - - - - - - - - - - - - - - - 12 - 1 1 Footnotes: (7) AN/SQQ-89A(V)15 installation funding is phased across two budget years. Performance of planning yard design tasks, ship checks, and the ordering of incidental installation material, depicted in the P-3a exhibit with a quantity of "0", are budgeted in the year *prior* to the actual physical installation of equipment. In the second budget year, costs associated with the actual physical installation of equipment on ship are shown with a quantity other than "0". LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 25 of 38 P-1 Line #39 Volume 2 - 33 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 151.225 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 151.225 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) 151.225 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 4.127 3.704 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 4.127 3.704 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 4.127 3.704 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 159.056 159.056 159.056 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT)] See the following: AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of a subset of AN/SQQ-89A(V)15 equipment, specifically the Multi-Function Towed Array (MFTA) and OK-410 Handling & Stowage Group (H&SG), for subsequent installation on all DDG113-132 ships during their Post Delivery Availability (PDA) or Post Shakedown Availability (PSA) periods, to upgrade the ASW sonar suite from an AN/SQQ-89(V)15 configuration to the AN/SQQ-89A(V)15 configuration. AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB6IN INSTALLATION (SHIPALT): Physical installation of the MFTA and OK-410 H&SG on DDG113-132 ships during their PDA or PSA period which includes the installation of an egress, under-deck stiffeners, cables, bulkheads, opening and closing of the transom, the winch, levelwind, fairlead and control station, decking, painting, and final system testing, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 26 of 38 P-1 Line #39 Volume 2 - 34 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) MDAP/MAIS Code: Models of Systems Affected: Upgrade of in-line AN/SQQ-89(V)15 on all DDG113-132 ships to AN/ SQQ-89A(V)15 configuration Prior Years Modification Type: Warfighting Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/SQQ-89A(V)15 DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) B Kits Recurring 1.1.1) AN/SQQ-89A(V)15 - DDG113-132 MFTA/ HANDLER UPGRADE (SHIPALT) - NonOrganic (8) Subtotal: Recurring Subtotal: AN/SQQ-89A(V)15 - DDG113-132 MFTA/ HANDLER UPGRADE (SHIPALT) Subtotal: Procurement, All Modification Items 20 / 118.552 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 118.552 - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 118.552 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 118.552 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 40.504 / - - / 0.000 - / 40.504 - - / 0.000 20 / 118.552 - / - / 118.552 - 20 / 118.552 / 118.552 - Installation Modification Item 1 of 1: AN/SQQ-89A(V)15 DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) - / 32.673 - / 4.127 - / 3.704 Subtotal: Installation - / 32.673 - / 4.127 - / 3.704 - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 151.225 4.127 3.704 0.000 0.000 UNCLASSIFIED Page 27 of 38 0.000 0.000 0.000 P-1 Line #39 0.000 0.000 0.000 159.056 Volume 2 - 35 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) MDAP/MAIS Code: Modification Item 1 of 1: AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT and SHIPYARD:: Installation Name: AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE (SHIPALT) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 16 / 32.673 20 / 40.504 Prior Years 2 / 4.127 2 / 3.704 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 3.704 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 16 / 32.673 2 / 4.127 20 / 40.504 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 - 1 1 - - - 1 1 - - - - - - - - - - - - - - - - - - - - - 20 Out 16 - 1 1 - - - 1 1 - - - - - - - - - - - - - - - - - - - - - 20 Footnotes: (8) AN/SQQ-89A(V)15 installation funding is phased across two budget years. Performance of planning yard design tasks, ship checks, and the ordering of incidental installation material, depicted in the P-3a exhibit with a quantity of "0", are budgeted in the year *prior* to the actual physical installation of equipment. In the second budget year, costs associated with the actual physical installation of equipment on ship are shown with a quantity other than "0". LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 28 of 38 P-1 Line #39 Volume 2 - 36 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 313.332 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 313.332 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) 313.332 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 21.419 10.713 10.928 0.000 10.928 11.146 4.542 4.358 0.000 0.000 - - - - - - - - - - 21.419 10.713 10.928 0.000 10.928 11.146 4.542 4.358 0.000 0.000 - - - - - - - - - - 21.419 10.713 10.928 0.000 10.928 11.146 4.542 4.358 0.000 0.000 Total 376.438 376.438 376.438 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT)] See the following: AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/ SQQ-89A(V)15 with a Technical Insertion-12 (TI-12+) production baseline configuration or lower (TI-09 through TI-12+). These technology insertion/refreshes have proven to minimize COTS obsolescence issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Anti-Submarine Warfare Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor and Infrastructure as a Service (IaaS) technology advancement hardware/software. Hypervisor allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. Hypervisor also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. Unlike the Build-In-Place (BIP) technology refresh planned for AN/SQQ-89A(V)15 TI-14 and follow production baselines, the TI-12+ and prior production baselines will also require the procurement of new equipment racks to host the Hypervisor and IaaS advancements. NOTE: The FY 2027 and FY 2028 procurements of AN/SQQ-89A(V)15 Technology Insertion/Refresh systems are intended for subsequent backfits onboard DDG53 (USS JOHN PAUL JONES) and DDG66 (USS GONZALEZ) in support of the Service Life Extension (SLE) to DDG51 Class FLT I hulls. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 29 of 38 P-1 Line #39 Volume 2 - 37 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) MDAP/MAIS Code: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the physical installation of the AN/SQQ-89A(V)15 Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and the Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. NOTE: Physical installation costs shown factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 30 of 38 P-1 Line #39 Volume 2 - 38 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) MDAP/MAIS Code: Models of Systems Affected: Technology refresh of previously fielded AN/SQQ-89A(V)15 USW Combat Systems Prior Years Related RDT&E PEs: 0205620N, 0603553N, 0603561N Modification Type: Warfighting Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/SQQ-89A(V)15 TECHNOLOGY INSERTION/REFRESH (SHIPALT) B Kits Recurring 1.1.1) AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) - NonOrganic (9) Subtotal: Recurring Subtotal: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) Subtotal: Procurement, All Modification Items 45 / 214.435 1 / 6.307 / 214.435 - - 45 / 214.435 - 1 / 6.307 / 214.435 - / 6.307 1 / 6.433 - / 6.433 - 1 / 6.433 1 / 6.562 - / - 1 / 6.562 / 6.562 - / - 1 / 6.562 - / - - / - - / 6.562 / 0.000 - / - - / 6.307 - / 6.433 - / 6.562 - / 6.562 1 / 6.693 - / - - / - - / - - / - / 6.693 - / - - / - - / - 1 / 6.693 - / - - / - - / - - / 6.693 - / - - / - - / - - / 0.000 - / 240.430 / 4.366 - / 4.453 - / 4.542 - / 4.358 / 0.000 - / 0.000 - / 136.008 / 4.366 - / 4.453 - / 4.542 - / 4.358 / - - / 0.000 - / 136.008 - 1 / 6.562 / 0.000 49 / 240.430 - / - - / 240.430 49 / 240.430 Installation Modification Item 1 of 1: AN/SQQ-89A(V)15 TECHNOLOGY INSERTION/REFRESH (SHIPALT) - / 98.897 - / 15.112 - / 4.280 - / 4.366 Subtotal: Installation - / 98.897 - / 15.112 - / 4.280 - / 4.366 - - Total Total Cost (Procurement + Support + Installation) LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 313.332 21.419 10.713 10.928 0.000 UNCLASSIFIED Page 31 of 38 10.928 11.146 4.542 P-1 Line #39 4.358 0.000 0.000 376.438 Volume 2 - 39 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) MDAP/MAIS Code: Modification Item 1 of 1: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jun 2025 May 2026 Mar 2027 Mar 2028 Delivery Dates Dec 2026 Nov 2027 Sep 2028 Sep 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: AIT and SHIPYARD:: Installation Name: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 38 / 98.897 6 / 15.112 - Prior Years 1 / 4.026 - / - - / - - / - - / - - / - 0 / 0.000 45 / 118.035 FY 2025 - / - - / - 0 / 0.254 1 / 4.107 0 / 0.000 1 / 4.107 - / - - / - - / - - / - 0 / 0.000 1 / 4.361 FY 2026 - / - - / - - / - 0 / 0.259 0 / 0.000 0 / 0.259 1 / 4.189 - / - - / - - / - 0 / 0.000 1 / 4.448 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 0.264 1 / 4.273 - / - - / - 0 / 0.000 1 / 4.537 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 0.269 1 / 4.358 - / - 0 / 0.000 1 / 4.627 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.358 - / - 0 / 0.000 Total 38 / 98.897 6 / 15.112 1 / 4.280 / - - 1 / 4.366 / - 0 / 0.000 1 / 4.366 1 / 4.453 1 / 4.542 49 / 136.008 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 38 - 2 2 2 - - 1 - - - 1 - - - 1 - - 1 - - - 1 - - - - - - - 49 Out 38 - 2 2 2 - - 1 - - - 1 - - - 1 - - 1 - - - 1 - - - - - - - 49 Footnotes: (9) AN/SQQ-89A(V)15 installation funding is phased across two budget years. Performance of planning yard design tasks, ship checks, and the ordering of incidental installation material, depicted in the P-3a exhibit with a quantity of "0", are budgeted in the year *prior* to the actual physical installation of equipment. In the second budget year, costs associated with the actual physical installation of equipment on ship are shown with a quantity other than "0". One (1) set of planning yard design tasks/ship checks/installation material is required in FY 2027 ($0.259M per ship * 1 = $0.259M), one year prior to the scheduled FY LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 32 of 38 P-1 Line #39 Volume 2 - 40 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH (SHIPALT) MDAP/MAIS Code: 2028 installation on ship. NOTE: Physical installation costs shown factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 33 of 38 P-1 Line #39 Volume 2 - 41 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 61.908 66.136 78.199 83.426 0.000 83.426 67.211 67.673 71.653 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 61.908 66.136 78.199 83.426 0.000 83.426 67.211 67.673 71.653 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) - - - - - - - - - 61.908 66.136 78.199 83.426 0.000 83.426 67.211 67.673 71.653 To FY 2031 Complete 74.289 Continuing - Continuing - 74.289 Continuing - Total - Continuing - - 74.289 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [AN/SQQ-89A(V)15 - TECH INSERTION/REFRESH BUILD-IN-PLACE (SHIPALT)] See the following: AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment via SHIPALT. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh - Build-In-Place program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15 with a Technology Insertion-14 (TI-14) production baseline configuration or higher. These technology insertion/refreshes have proven to minimize COTS obsolescence issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Ship ASW Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor and Infrastructure as a Service (IaaS) technology advancement hardware/software. Hypervisor allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. Hypervisor also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. AN/SQQ-89A(V)15 TI-14 and above production baselines have a consistent architecture and similar configuration which allows a similar strategy that submarine Acoustic Rapid Commercial Off The Shelf (COTS) Insertion (ARCI) programs employ in order to retain equipment racks and upgrade processing, storage, and network capacity onboard the platform during installation. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 34 of 38 P-1 Line #39 Volume 2 - 42 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) MDAP/MAIS Code: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB6IN INSTALLATION (SHIPALT): Funding is for the physical installation of the AN/SQQ-89A(V)15 Build-InPlace Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. Physical installation costs factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 35 of 38 P-1 Line #39 Volume 2 - 43 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Build-In-Place Technology Refresh of Previously Fielded AN/ SQQ-89A(V)15 USW Combat Systems Related RDT&E PEs: 0205620N, 0603553N, 0603561N Modification Type: Warfighting Capability Prior Years Financial Plan Modification Number / Title: 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-IN-PLACE (SHIPALT) B Kits Recurring 2.1.1) AN/SQQ-89A(V)15 - TECH INSERTION/ REFRESH BUILD-IN-PLACE (SHIPALT) - NonOrganic 12 / 61.908 12 / 63.144 5 / 26.835 6 / 32.850 - / - 6 / 32.850 8 / 44.680 7 / 39.879 6 / 34.866 7 / 41.489 Continuing Continuing (10) Subtotal: Recurring Subtotal: AN/SQQ-89A(V)15-TECH INSERTION/ REFRESH-BUILD-IN-PLACE (SHIPALT) Subtotal: Procurement, All Modification Items / 61.908 - 12 / 61.908 / 61.908 - / 63.144 - - 12 / 63.144 - / 26.835 - 5 / 26.835 Continuing Continuing Continuing - / 41.489 Continuing Continuing / 36.787 - / 32.800 - / 62.175 - / 287.019 / 36.787 - / 32.800 - / 62.175 - / 287.019 / - - / - - / 32.850 - / 44.680 - / 39.879 - / 34.866 / 0.000 - / 50.576 - / 22.531 - / 27.794 - / - - / 50.576 - / 22.531 - / 27.794 - / 63.144 - / 26.835 - / 32.850 - - 8 / 44.680 / 39.879 Continuing / - - 6 / 32.850 / 44.680 / 41.489 - - / 32.850 7 / 41.489 / 32.850 6 / 32.850 - 7 / 39.879 / 34.866 - 6 / 34.866 Installation Modification Item 1 of 1: AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-IN-PLACE (SHIPALT) - / 0.000 - / 2.992 - / 51.364 - / 50.576 Subtotal: Installation - / 0.000 - / 2.992 - / 51.364 - / 50.576 - Total Total Cost (Procurement + Support + Installation) LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy 61.908 66.136 78.199 83.426 0.000 UNCLASSIFIED Page 36 of 38 83.426 67.211 67.673 P-1 Line #39 71.653 74.289 Continuing Continuing Volume 2 - 44 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) MDAP/MAIS Code: Modification Item 1 of 1: AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-IN-PLACE (SHIPALT) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jun 2025 May 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Dec 2026 Nov 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Sep 2032 Installation Information Method of Implementation: AIT and SHIPYARD:: Installation Name: AN/SQQ-89A(V)15 - TECH INSERTION/REFRESH BUILD-IN-PLACE (SHIPA Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 12 / 48.312 - - / - - / - - / - - / - 0 / 0.000 12 / 51.304 - / - - / - - / - - / - 0 / 0.000 12 / 52.330 - / - - / - - / - 0 / 0.000 5 / 22.241 - / - - / - 0 / 0.000 6 / 27.223 - / - 0 / 0.000 8 / 37.019 Prior Years - / - 0 / 2.992 FY 2025 - / - - / - 0 / 3.052 FY 2026 - / - - / - - FY 2027 - / - - / - FY 2028 - / - - FY 2029 - / - FY 2030 - FY 2031 - / - - / - / - 12 / 49.278 0 / 0.000 12 / 49.278 / - 0 / 1.298 0 / 0.000 0 / 1.298 5 / 20.943 - / - - / - - / - - / - 0 / 1.588 6 / 25.635 / - - / - - / - - / - - / - - / - 0 / 2.159 8 / 34.860 - / - - / - - / - - / - - / - - / - - / - 0 / 1.927 7 / 31.115 0 / 0.000 7 / 33.042 / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.685 6 / 27.203 6 / 28.888 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 34.972 7 / 34.972 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total - / - 0 / 2.992 7 / 32.800 13 / 62.175 12 / 51.364 12 / 50.576 0 / 0.000 12 / 50.576 5 / 22.531 6 / 27.794 8 / 36.787 - / - 63 / 287.019 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 3 5 4 - 3 5 4 - 2 2 1 - 2 2 2 - 2 3 3 - 2 3 2 13 63 Out - - - - - - 3 5 4 - 3 5 4 - 2 2 1 - 2 2 2 - 2 3 3 - 2 3 2 13 63 Footnotes: (10) AN/SQQ-89A(V)15 installation funding is phased across two budget years. Performance of planning yard design tasks, ship checks, and the ordering of incidental installation material, depicted in the P-3a exhibit with a quantity of "0", are budgeted in the year *prior* to the actual physical installation of equipment. In the second budget year, costs associated with the actual physical installation of equipment on ship LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 37 of 38 P-1 Line #39 Volume 2 - 45 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2136 / AN/SQQ-89 Surf ASW Cmbt Sys ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / AN/SQQ-89A(V)15-TECH INSERTION/REFRESH-BUILD-INPLACE (SHIPALT) MDAP/MAIS Code: are shown with a quantity other than "0". Five (5) sets of planning yard design tasks/ship checks/installation material are required in FY 2027 ($0.2596M per ship * 5 = $1.298M), one year prior to the scheduled FY 2028 installations on ship. Physical installation costs factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. LI 2136 - AN/SQQ-89 Surf ASW Cmbt Sys Navy UNCLASSIFIED Page 38 of 38 P-1 Line #39 Volume 2 - 46 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 2,998.724 2,998.724 2,998.724 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 458.824 458.824 458.824 498.597 498.597 498.597 454.161 - 0.000 - 454.161 - 0.000 - 454.161 0.000 454.161 454.161 454.161 567.952 567.952 567.952 500.301 500.301 500.301 564.065 564.065 - To FY 2031 Complete 528.231 Continuing 528.231 Total - Continuing Continuing - Continuing - - 564.065 528.231 Continuing Continuing 68.091 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 26.949 - 27.595 - 27.595 60.903 46.920 73.329 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This program procures submarine systems and equipment for installation on all classes of submarines to maintain clear acoustical, tactical, and operational superiority over submarine and surface combatants in all scenarios through detection, classification, localization, and contact following. All future acoustic upgrades of Acoustic Rapid COTS Insertion (A-RCI) equipment are incorporated into this budget item. Future procurements, detailed below, are focused on supporting Littoral Warfare, Regional Sea Denial, Strike Group Support, Diesel Submarine Detection, Surveillance, and Peacetime Engagement. A-RCI is a multi-phased, evolutionary development effort geared toward addressing acoustic superiority issues through the rapid introduction of interim products applicable to SSN 688, 688I Flight, SSN21, SSGN, VIRGINIA Class, and OHIO Class Submarines. A-RCI Phase II provided towed array processing improvements; A-RCI Phase III provides spherical array processing improvements, and A-RCI Phase IV provides AN/BSY-1 High Frequency Upgrades for SSN 688I, SSGN, and SEAWOLF Classes. As part of Navy's plan to maintain acoustic superiority for in-service submarines, reduce obsolescence, and provide increased capability, the A-RCI program will modernize and sustain approximately 8-12 SSNs and 2-3 SSBNs per year through executing bi-annual software Advanced Processing Builds (APBs) and bi-annual hardware Technical Insertions (TIs). A-RCI annual funding varies based on the number of modernizations funded as well as the particular class of submarine being modernized. Towed System procurements of TB-29C and TB-34A provide reliability improvements to maintain Acoustic Superiority, increase the service life, reduce failures, and maintain the inventory of arrays available for fleet use. Towed Array Refurbishment & Reliability Upgrades sustain current in-service TB-16/34 Fatline and TB-23/29A Thinline towed arrays. Towed System procurements provide upgrade/support for OK-276, OK-634, OK-542 and OA-9070 Series Towed Array Handlers installed on SSN688, SSN 688I, SSN21, SSGN, VIRGINIA Class, and OHIO Class Submarines. Procurement of Low Cost Conformal Array (LCCA) provides enhanced situational awareness and collision avoidance capability in high contact density environments experienced in the littorals. Procurement of VA Unique Sensors sustains unique hull sensor systems for the VA platforms under the Critical Transducer Program as VIRGINIA Class submarines transition into fleet service. Procurement of the OHIO Class Large Vertical Array (LVA) provides improved detection and enhanced tactical situational awareness capability for tracking targets of interest and supports acoustic superiority objectives for the OHIO class submarines. SSBN systems will be approximately half the width of their SSN counterparts. This variance reflects the difference in mission, expected environment, and requirements. Procurement of the VIRGINIA Class Large Vertical Array (LVA) and installation provides improved detection and enhanced tactical situational awareness capability for tracking targets of interest and supports acoustic superiority objectives for the VIRGINIA class submarines. SSN systems will be approximately twice the width of their SSBN counterparts. This variance reflects the difference in mission, expected environment, and requirements. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 1 of 42 P-1 Line #40 Volume 2 - 47 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Procurement of the High Frequency Sail Array (HFSA) provides high frequency active and passive capability supporting ASW and ASUW for SSNs, and contact avoidance for SSNs and SSBNs. This capability enables close in situational awareness with high bearing accuracy. HFSA improves situational awareness and tactical control in high -density contact areas, of particular importance for Pacific Fleet SSBNs based at Bangor, WA inside the Puget Sound with three major commercial shipping ports as well as the Atlantic Fleet SSBNs based at Kings Bay, GA as increased global shipping density has increased the risk posed to SSBNs from merchant traffic. Procurement of hydrophones, transducers, cables, associated Out-Board Electronics bottles (OBE), and acoustic windows for In-Service Undersea Warfare Sonars on all classes of submarines are required to support units in the fleet on a replacement basis, at regularly scheduled ship overhauls, and at interim availabilities when units are defective, and for upgrades. Procurement of Light Weight Wide Aperture Array (LWWAA) Unit 6512 receiver hardware for technology refresh for Software and Hardware updates to accommodate shifts in technology to counter obsolescence on Block I/II VIRGINIA Class submarines. The LWWAA on Block I/II VIRGINIA Class submarines will no longer be operable without this technology refresh. Installation funds are for actual hardware installations during shipyard and pier-side availabilities. Procurements support a 18-24 month lead-time for installations. [P40A / SA102 TOWED SYSTEMS]: Procures TB-34A Fatline and TB-29C Thinline Arrays to provide increased acoustic capability and reliability to the fleet. The program supports refurbishment/upgrades and reliability improvements to TB-16 series, TB-23, TB-29A to maintain in-service Towed Array inventory and increased array availability. Reliability improvements include new telemetry, hose material, improved internal connectors, hydrophones, tow cables, Vibration Isolation Modules (VIMS), and Heading Sensors. [P40A / TB-34A FATLINE TOWED ARRAYS]: Beginning in FY27 unit price was increased due to follow on contract award negotiations. [P40A / TB-29C THIN LINE TOWED ARRAYS]: Beginning in FY27 unit costs were increased due to follow-on contract negotiated pricing. [P40A / SA105 SONAR SUPPORT EQUIPMENT]: Funds provided to procure BQN-17(A) and associated equipment. [P40A / SA106 HULL SENSORS]: Procurement of Low Cost Conformal Array (LCCA), which provides enhanced situational awareness and collision avoidance capability, Large Vertical Array (LVA), which provides improved detection and enhanced tactical situational awareness capability, and VA Unique Sensors required to sustain unique hull sensor systems for the VA platforms under the Critical Transducer Program. [P40A / SA201 BLOCK CHANGES]: Minor Engineering Change Proposals (ECP's) and hardware changes affecting all classes of submarines are procured through this line. Funding will be used to support non-recurring first article test efforts associated with the changing COTS environment as well as Reliability, Maintainability, and Availability modifications requested by the Fleet. This line also supports the procurement of hardware necessary to implement the ECP's into the System or end item being procured. [P40A / SA202 PRODUCTION/ENGINEERING SUPPORT]: Funding supports the procurement of Acoustic Upgrades equipment, Towed Systems hardware, Large Vertical Array in-board processing equipment, Large Vertical Array shipyard installation support & support equipment, and Low Cost Conformal Array engineering and production to support the reduced weight variant. [P40A / LARGE VERTICAL ARRAY]: SA202 LARGE VERTICAL ARRAY SHIPYARD INSTALLATION INDUSTRIAL SUPPORT - Funding provides Large Vertical Array (LVA) shipyard infrastructure alterations required to integrate the array and its subcomponents, alterations to the SSBN superstructure, environmental enclosures, and the installation of new hull penetrators. [P40A / LARGE VERTICAL ARRAY SHIPYARD INSTALLATION INDUSTRIAL SUPPORT]: SA202 LARGE VERTICAL ARRAY / SHIPYARD INSTALLATION INDUSTRIAL SUPPORT - Funding provides Large Vertical Array (LVA) shipyard infrastructure alterations required to integrate the array and its subcomponents, alterations to the SSBN superstructure, environmental enclosures, and the installation of new hull penetrators. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 2 of 42 P-1 Line #40 Volume 2 - 48 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / SA203 TOWED ARRAY UNIQUE TEST EQUIPMENT]: Funding procures various Towed Array test equipment simulators and handling system/stowage tube inspection test equipment. [P40A / SA302 OP TRAINER UPGRADES]: Funding procures hardware upgrades and production engineering for Acoustic Upgrades operational trainer sites. [P40A / SA303 COTS SUPPORTABILITY UPGRADES]: Provides for Technology Refresh/Insertion for A-RCI kits. Tech Refresh provides for Software and Hardware updates to accommodate shifts in technology to the execution procurement years' "current state-of-the-practice" hardware. A-RCI has already undergone several technology insertion phases to accommodate integrating Advanced Processing Builds (APBs). Updates are necessary for signal and display processing hardware as APBs are introduced or as commercial support for the hardware is phased out. Tech Insertion procures the hardware necessary to upgrade and back fit the A-RCI kits. When A-RCI systems are being upgraded to subsequent phases of A-RCI, signal processing and display hardware will be procured from this line to accommodate common technology consistent with the APB being implemented in the year of introduction. In future years, requirements include additional equipment in technology insertion to prevent COTS hardware from becoming unsupportable/obsolete. Funding also supports the procurement and engineering for COTS Underwater Comms and the CYBER Reliability Support. [P40A / COTS TECH INSERTION]: SA303 COTS TECH INSERTION - Funding supports investment in Long Lead Time Material (LLTM) and non-recurring engineering for improvements and modifications to current Fleet capabilities. [P40A / SA401 INITIAL TRAINING]: Provides for initial training curriculum development, training management materials, exercise control group development, pilot services, and services to the Fleet. [P40A / SA900 CONSULTING SERVICES]: Includes specification validation, contract deliverable monitoring, prime contractor monitoring for cost, schedule, and performance slips, ILS planning, and coordination of GFI. Additional support will include production planning, business case analysis, technical refresh and insertion planning and market analysis to review implementation strategies for procurement of current year "state of the practice" hardware in Acoustics programs. Consulting services will also provide production monitoring, installation planning and coordination support. [P40A - 2 / PU100 SONAR, SWITCHES, AND TRANSDUCERS]: Included in this line are procurements of transducers, hydrophones, windows, cables, domes, accelerometers, Out-Board Electronics (OBE), domes and their associated mounting hardware, and other support equipment and materials for the following Undersea Warfare Sonars: BSY-1, BSY-2, BQQ-5, BQQ-6, BQQ-10, BQG-5, BQS-15, BQS-14A, WQC-2, WLR-9/12, BQN-13, BQN-17, BQA-8, BQH-1 and BQS-25. In-Service Enginering Agent (ISEA) and Technical Design Agent (TDA) support for these procurements is also included in this line. [P40A - 2 / CABLES]: Procures sonar cables to support Fleet usage requirements to maintain submarines in an operational status, adjustments are made to product types and quantities. Items not procured in a single year do not impact the production line. [P40A - 2 / SENSORS AND ARRAYS]: Procures sonar sensors, arrays, and transducers to support Fleet usage requirements to maintain submarines in an operational status, adjustments are made to product types and quantities. Items not procured in a single year do not impact the production line. [P40A - 2 / DOMES AND WINDOWS]: Procures sonar domes and windows to support Fleet usage requirements to maintain submarines in an operational status, adjustments are made to product types and quantities. Items not procured in a single year do not impact the production line. [P40A - 2 / PU200 ENGINEERING CHANGES]: Funds ECPs, Value Engineering awards, and hardware changes affecting the SSN 688, 688I, SEAWOLF, SSBN 726 (TRIDENT), SSGN/SSBN, and VA Class submarines. [P40A - 2 / ENGINEERING CHANGES]: Supports engineering changes to maintain submarines in an operational status. [P40A - 2 / PU300 PROGRAM SUPPORT]: Supports the procurement of equipment of sonar hydrophones, transducers, cables, Out-Board Electronics (OBEs), and acoustic windows for In-Service Undersea Warfare Sonars. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 3 of 42 P-1 Line #40 Volume 2 - 49 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A - 2 / PROGRAM SUPPORT]: Supports procurement of equipment of sonar hydrophones, transducers, cables, Out-Board Electronics (OBEs), and acoustic windows and domes for In-Service Undersea Warfare Sonars. [P3A / SA101 LWWAA TECH REFRESH]: Funding supports procurement of Light Weight Wide Aperature Array (LWWAA) Unit 6512 receiver hardware for technology refresh for Software and Hardware updates to accommodate shifts in technology to counter obsolescence on Block I/II VIRGINIA Class submarines. [P3A - 2 / SA101 SSBN LEGACY INTERFACE HARDWARE]: Procurement of hardware to accommodate increased power requirements of SSBN modernization equipment. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 4 of 42 P-1 Line #40 Volume 2 - 50 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SSN Acoustics / 1,398.730 - / 219.281 - / 215.990 - / 229.133 - / - - / 229.133 P-40a Sonar Switches and Transducers - / 114.154 - / 16.062 - / 16.381 - / 16.708 - / - - / 16.708 P-3a 1 / SA101 LWWAA TECH REFRESH (SHIPALT) - / 22.463 - / 12.559 - / 12.813 - / 13.070 - / 0.000 - / 13.070 P-3a 2 / SA101 SSBN LEGACY INTERFACE HARDWARE (SHIPALT) - / 76.681 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / SA106 LOW COST CONFORMAL ARRAY KITS (SHIPALT) - / 110.975 - / 22.486 - / 19.193 - / 19.577 - / 0.000 - / 19.577 P-3a 4 / SA106 HIGH FREQUENCY SAIL ARRAY (SHIPALT) - / 44.361 - / 7.266 - / 4.732 - / 7.612 - / 0.000 - / 7.612 P-3a 5 / SA106 OHIO CLASS LARGE VERTICAL ARRAY (SHIPALT) - / 128.192 - / 41.245 - / 42.070 - / 42.911 - / 0.000 - / 42.911 P-3a 6 / SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY (SHIPALT) - / 286.817 - / 22.124 - / 71.424 - / 0.000 - / 0.000 - / 0.000 P-3a 7 / SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) (SHIPALT) - / 290.752 - / 2.592 - / 0.000 - / 22.944 - / 0.000 - / 22.944 P-3a 8 / SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) (SHIPALT) - / 64.777 - / 3.845 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (SHIPALT) - / 312.507 - / 75.975 - / 69.171 - / 75.605 - / 0.000 - / 75.605 P-3a 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) (SHIPALT) P-40 Total Gross/Weapon System Cost - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 148.315 - / 35.389 - / 46.823 - / 26.601 - / 0.000 - / 26.601 / 2,998.724 - / 458.824 - / 498.597 - / 454.161 - / 0.000 - / 454.161 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SSN Acoustics - / - - / - - / - - / - - / - - P-40a Sonar Switches and Transducers - / - - / - - / - - / - - / - - P-3a 1 / SA101 LWWAA TECH REFRESH (SHIPALT) P-3a 2 / SA101 SSBN LEGACY INTERFACE HARDWARE (SHIPALT) - / 0.000 - / 0.000 - / 0.000 - P-3a 3 / SA106 LOW COST CONFORMAL ARRAY KITS (SHIPALT) - / 19.969 - / 20.368 - / 20.776 - P-3a 4 / SA106 HIGH FREQUENCY SAIL ARRAY (SHIPALT) - / 2.391 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 66.362 P-3a 5 / SA106 OHIO CLASS LARGE VERTICAL ARRAY (SHIPALT) - / 43.770 - / 44.645 - / 45.537 - / 46.449 - / 47.294 - / 482.113 P-3a 6 / SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY (SHIPALT) - / 74.310 - / 51.847 - / 77.311 - / 78.857 Continuing Continuing P-3a 7 / SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) (SHIPALT) - / 31.168 - / 7.168 - / 37.674 - / 23.993 Continuing Continuing P-3a 8 / SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) (SHIPALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 Continuing Continuing P-3a 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (SHIPALT) - / 95.141 - / 130.649 - / 111.634 - / 135.927 Continuing Continuing P-3a 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) (SHIPALT) - / 17.330 - / 34.661 - / 27.939 - / 23.084 Continuing Continuing LI 2150 - SSN Acoustic Equipment Navy - / 13.330 - / 2.167 UNCLASSIFIED Page 5 of 42 - / 0.000 - P-1 Line #40 / 0.000 - / 0.000 / 0.000 - / 0.000 / 21.191 Continuing / / - - / 76.402 - / 76.681 Continuing Volume 2 - 51 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type P-40 Title* Subexhibits Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing Continuing - / 567.952 - / 500.301 - / 564.065 - / 528.231 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding provides the following procurement requirements in support of submarine modernizations: Acoustic Rapid COTS Insertion (A-RCI) equipment (4) VA Mod (Blk I/II/III/IV/V kits, and (1) SSBN Ohio Class; TB-34A Fatline (4) and TB-29C Thinline (4) Towed Arrays; Towed Array refurbishment & reliability upgrades to sustain current in-service TB-16/34 Fatline and TB-23/29A Thinline arrays; OK-276, OK-634, OK-542, and OA-9070 Series Towed Array Handlers; HFSA (1) for SSBN, LCCA (2 SSN) and (1) Ohio Class Large Vertical Array (LVA); and various hull sensors, transducers, and associated equipment for all classes of In-Service submarines. Overall decrease from FY26 to FY27 of $44.4365M is driven by internal program adjustments. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 6 of 42 P-1 Line #40 Volume 2 - 52 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: SSN Acoustics ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) SA102 TOWED SYSTEMS 1.1) TB-34A FATLINE TOWED ARRAYS (1) 1.2) TB-29C THIN LINE TOWED ARRAYS B B (2) 1.3) TOWED ARRAY REFURBISHMENT & UPGRADES A (3) 1.4) TOWED ARRAY HANDLER SYSTEM UPGRADE A Subtotal: 1) SA102 TOWED SYSTEMS 1,323K 52 68.785 1,463K 5 7.315 1,492K 5 7.461 3,729K 4 14.916 - - - 3,729K 4 14.916 4,481K 62 277.841 4,921K 5 24.605 5,019K 4 20.078 5,668K 4 22.672 - - - 5,668K 4 22.672 - - 279.460 - - 42.678 - - 33.618 - - 34.290 - - - - - 34.290 - - 63.585 - - 8.680 - - 8.854 - - 9.031 - - - - - 9.031 - - 689.671 - - 83.278 - - 70.011 - - 80.909 - - - - - 80.909 - - 7.613 - - 1.039 - - 1.060 - - 1.081 - - - - - 1.081 - - 7.613 - - 1.039 - - 1.060 - - 1.081 - - - - - 1.081 - - 50.887 - - 6.208 - - 14.593 - - 8.551 - - - - - 8.551 - - 50.887 - - 6.208 - - 14.593 - - 8.551 - - - - - 8.551 - - 15.469 - - 1.993 - - 2.033 - - 2.074 - - - - - 2.074 - - 28.182 - - 3.541 - - 3.612 - - 3.684 - - - - - 3.684 - - 43.651 - - 5.534 - - 5.645 - - 5.758 - - - - - 5.758 - - 29.539 - - 3.712 - - 3.786 - - 3.862 - - - - - 3.862 - - 28.287 - - 3.644 - - 3.717 - - 3.791 - - - - - 3.791 - - 16.409 - - 14.208 - - 8.897 - - 14.776 - - - - - 14.776 - - 98.971 - - 27.343 - - 24.109 - - 24.591 - - - - - 24.591 2) SA105 SONAR SUPPORT EQUIPMENT 2.1) BQN-17 A Subtotal: 2) SA105 SONAR SUPPORT EQUIPMENT 3) SA106 HULL SENSORS 3.1) VA UNIQUE SENSOR A (4) Subtotal: 3) SA106 HULL SENSORS 4) SA201 BLOCK CHANGES 4.1) TOWED SYSTEMS ECP'S A 4.2) ACOUSTICS A Subtotal: 4) SA201 BLOCK CHANGES 5) SA202 PRODUCTION/ENGINEERING SUPPORT 5.1) ACOUSTICS A 5.2) TOWED ARRAYS/HANDLING EQUIPMENT A 5.3) LARGE A VERTICAL ARRAY 5.4) LARGE VERTICAL ARRAY SHIPYARD INSTALLATION INDUSTRIAL SUPPORT (5) A (6) LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 7 of 42 P-1 Line #40 Volume 2 - 53 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.5) LOW COST CONFORMAL ARRAY A MAIS Code Unit Cost ($) Subtotal: 5) SA202 PRODUCTION/ ENGINEERING SUPPORT Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SSN Acoustics FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 8.123 - - 1.828 - - 1.865 - - 1.903 - - - - - 1.903 - - 181.329 - - 50.735 - - 42.374 - - 48.923 - - - - - 48.923 - - 11.449 - - 1.475 - - 1.505 - - 1.535 - - - - - 1.535 - - 11.449 - - 1.475 - - 1.505 - - 1.535 - - - - - 1.535 - - 9.546 - - 1.304 - - 1.330 - - 1.357 - - - - - 1.357 - - 9.546 - - 1.304 - - 1.330 - - 1.357 - - - - - 1.357 - - 15.305 - - 1.798 - - 1.834 - - 1.871 - - - - - 1.871 - - 47.710 - - 6.513 - - 6.643 - - 6.776 - - - - - 6.776 - - 18.445 - - 2.067 - - 2.108 - - 2.150 - - - - - 2.150 - - 202.346 - - 22.423 - - 43.824 - - 44.700 - - - - - 44.700 - - - - - 1.300 - - 1.500 - - 1.500 - - - - - 1.500 - - 80.896 - - 30.258 - - 18.673 - - 19.070 - - - - - 19.070 - - 364.702 - - 64.359 - - 74.582 - - 76.067 - - - - - 76.067 6) SA203 TOWED ARRAY UNIQUE TEST EQUIPMENT 6.1) TOWED ARRAY UNIQUE TEST EQUIPMENT A Subtotal: 6) SA203 TOWED ARRAY UNIQUE TEST EQUIPMENT 7) SA302 OP TRAINER UPGRADES 7.1) OP TRAINER GFE A Subtotal: 7) SA302 OP TRAINER UPGRADES 8) SA303 COTS SUPPORTABILITY UPGRADES 8.1) INSTALL SUPPORT A 8.2) AEMP A 8.3) COTS UWC ENGINEERING SUPPORT A 8.4) COTS TECH A INSERTION (7) 8.5) COTS CYBER RELIABILITY SUPPORT (8) 8.6) SHIPYARD INSTALLATION INDUSTRIAL SUPPORT A A (9) Subtotal: 8) SA303 COTS SUPPORTABILITY UPGRADES 9) SA401 INITIAL TRAINING 9.1) ACOUSTICS A - - 15.246 - - 2.081 - - 2.123 - - 2.165 - - - - - 2.165 9.2) TOWED ARRAY A - - 6.065 - - 0.781 - - 0.797 - - 0.813 - - - - - 0.813 - - 21.311 - - 2.862 - - 2.920 - - 2.978 - - - - - 2.978 - - 12.179 - - 1.663 - - 1.129 - - 1.117 - - - - - 1.117 - - 6.392 - - 0.824 - - 0.841 - - 0.857 - - - - - 0.857 Subtotal: 9) SA401 INITIAL TRAINING 10) SA900 CONSULTING SERVICES 10.1) ACOUSTICS A 10.2) TOWED SYSTEMS A LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 8 of 42 P-1 Line #40 Volume 2 - 54 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: SSN Acoustics FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Subtotal: 10) SA900 CONSULTING SERVICES - - 18.571 - - 2.487 - - 1.970 - - 1.974 - - - - - 1.974 Total - - 1,398.730 - - 219.281 - - 215.990 - - 229.133 - - - - - 229.133 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) (3) Beginning in FY27 unit price was increased due to follow on contract award negotiations. Beginning in FY27 unit costs were increased due to follow-on contract negotiated pricing. SA102 TOWED SYSTEMS - Refurbishment & Upgrades are variable year-to-year based on projected Towed Array inventory requirements necessary to support submarine deployment schedules. Refurbishment/upgrade of TB-16, TB-34, TB-34A, TB-23, TB-23 iPEN, TB-29A, and TB-29C series arrays consists of procurement and assembly activities for over 375 module upgrades per year, over 600 array on-load and off-load evolutions per year; as well as, more than 150 array/module calibrations per year to increase reliability and address End-of-Life (EOL) upgrade requirements. (4) Funding supports several critical efforts to further address Sonar sustainment. These efforts include increased support to update In-Service VACL Chin Array modules to a newer, more capable network interface, replacement of obsolete technology, and addresses several EOL components. (5) (6) (7) SA202 LARGE VERTICAL ARRAY / SHIPYARD INSTALLATION INDUSTRIAL SUPPORT - Funding was rephased starting in FY27 due to fact of installation schedules for OHIO LVA backfits. SA202 LARGE VERTICAL ARRAY / SHIPYARD INSTALLATION INDUSTRIAL SUPPORT - Funding was rephased starting in FY27 due to fact of installation schedules for OHIO LVA backfits. SA303 COTS TECH INSERTION - FY27 funding supports investment in several critical efforts to further address Sonar sustainment. These efforts include increased support for LOS ANGELES (LA) Sphere Interface Unit (SIU) Tech Refresh, replacement of obsolete technology, and addresses several EOL components. VACL BLK I-IV TSMS Reliability Telemetry Backfit, LACL and SEAWOLF TSMS TAIPT Telemetry Obsolescence Refresh, and LA & VACL BLK I/II Spherical Array Legacy Transmit Group Tech Refresh efforts. (8) (9) Funding supports investment in non-recurring engineering for improvements and modifications by the Cyber Reliability Tiger Team (CRTT) to improve Cyber capabilities to the Fleet starting in FY25. Funding supports modifications to current Fleet installations. Funding includes new initiatives in LA CL and SEAWOLF TSMS TAIPT Telemetry Obsolescence Refresh, VACL BLK I-IV TSMS Reliability Telemetry Backfit, and LOS ANGELES Sphere Interface Unit (SIU) Tech Refresh. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 9 of 42 P-1 Line #40 Volume 2 - 55 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) 1) PU100 SONAR, SWITCHES, AND TRANSDUCERS 1.1) CABLES A 1.2) SENSORS AND ARRAYS A 1.3) DOMES AND WINDOWS A Subtotal: 1) PU100 SONAR, SWITCHES, AND TRANSDUCERS Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Sonar Switches and Transducers FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (10) - - 6.922 - - 1.831 - - 1.868 - - 1.897 - - - - - 1.897 - - 86.907 - - 11.637 - - 11.867 - - 12.113 - - - - - 12.113 - - 9.278 - - 1.085 - - 1.107 - - 1.129 - - - - - 1.129 - - 103.107 - - 14.553 - - 14.842 - - 15.139 - - - - - 15.139 - - 1.841 - - 0.252 - - 0.257 - - 0.262 - - - - - 0.262 - - 1.841 - - 0.252 - - 0.257 - - 0.262 - - - - - 0.262 2) PU200 ENGINEERING CHANGES 2.1) ENGINEERING CHANGES A Subtotal: 2) PU200 ENGINEERING CHANGES 3) PU300 PROGRAM SUPPORT 3.1) PROGRAM SUPPORT A - - 9.206 - - 1.257 - - 1.282 - - 1.307 - - - - - 1.307 Subtotal: 3) PU300 PROGRAM SUPPORT - - 9.206 - - 1.257 - - 1.282 - - 1.307 - - - - - 1.307 Total - - 114.154 - - 16.062 - - 16.381 - - 16.708 - - - - - 16.708 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (10) PU100 SONAR SWITCHES AND TRANSDUCERS - Due to Fleet usage requirements to maintain submarines in an operational status, pricing, and fleet schedules, adjustments are made to product types and quantities. Items not procured in a single year do not impact the production line. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 10 of 42 P-1 Line #40 Volume 2 - 56 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / SA101 LWWAA TECH REFRESH MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 22.463 12.559 12.813 13.070 0.000 13.070 13.330 2.167 0.000 0.000 0.000 76.402 Total - - - - - - - - - - - - 22.463 12.559 12.813 13.070 0.000 13.070 13.330 2.167 0.000 0.000 0.000 76.402 - - - - - - - - - - - - 22.463 12.559 12.813 13.070 0.000 13.070 13.330 2.167 0.000 0.000 0.000 76.402 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Funding supports procurement of Light Weight Wide Aperature Array (LWWAA) Unit 6512 receiver hardware for technology refresh for Software and Hardware updates to accommodate shifts in technology to counter obsolescence on Block I/II VIRGINIA Class submarines. LWWAA is an acoustic sensor that brings detection, tracking, and ranging capabilities to the submarine platform. Technology refresh supports long term increase in reliability for the LWWAA Processing Suite on 10 VIRGINIA Class Block I/II platforms. [LWWAA TECH REFRESH] Funding in FY 2027 provides for the procurement of two LWWAA Tech Refresh units. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 11 of 42 P-1 Line #40 Volume 2 - 57 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SA101 LWWAA TECH REFRESH MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SA101 LWWAA TECH REFRESH B Kits Recurring 1.1.1) LWWAA TECH REFRESH - NonOrganic 4 / 20.503 (11) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 20.503 - Subtotal: SA101 LWWAA TECH REFRESH 2 / 10.560 / 20.503 - / 10.560 - 4 / 20.503 2 / 10.771 / 10.560 - / 10.771 - 2 / 10.560 / 10.771 - / - / 10.987 - / - 2 / 10.987 - / - / 10.987 - / - - 2 / 10.771 - 2 / 10.987 - 2 / 10.987 / 10.987 - / 10.987 - / - - / - - / - - / - / 11.206 - / - - / - - / - - / - - / - - / - / 11.206 - / - - / - - / - - / 0.000 - / 64.027 / 0.000 - / 0.000 - / 12.375 / - - / 0.000 - / 12.375 - / 0.000 12 / 64.027 2 / 11.206 - 2 / 10.987 - 2 / 11.206 - / - - / 64.027 12 / 64.027 Installation Modification Item 1 of 1: SA101 LWWAA TECH REFRESH - / 1.960 - / 1.999 - / 2.042 - / 2.083 Subtotal: Installation - / 1.960 - / 1.999 - / 2.042 - / 2.083 - / 0.000 - / 2.083 - / 2.124 - / 2.167 / - - / 2.083 - / 2.124 - / 2.167 - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 22.463 12.559 12.813 13.070 0.000 UNCLASSIFIED Page 12 of 42 13.070 13.330 2.167 P-1 Line #40 0.000 0.000 0.000 76.402 Volume 2 - 58 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SA101 LWWAA TECH REFRESH MDAP/MAIS Code: Modification Item 1 of 1: SA101 LWWAA TECH REFRESH Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: LWWAA TECH REFRESH Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 1.960 2 / 1.999 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 3.959 FY 2025 - / - - / - 2 / 2.042 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.042 FY 2026 - / - - / - - / - 2 / 2.083 0 / 0.000 2 / 2.083 - / - - / - - / - - / - 0 / 0.000 2 / 2.083 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 2.124 - / - - / - - / - 0 / 0.000 2 / 2.124 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 2.167 - / - - / - 0 / 0.000 2 / 2.167 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 1.960 2 / 2.167 - / - - / - 0 / 0.000 Installation Cost 2 / 1.999 2 / 2.042 2 / 2.083 0 / 0.000 2 / 2.083 2 / 2.124 12 / 12.375 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - - - - - - - 12 Out 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - - - - - - - 12 Footnotes: (11) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 13 of 42 P-1 Line #40 Volume 2 - 59 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / SA101 SSBN LEGACY INTERFACE HARDWARE MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 76.681 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 76.681 Total - - - - - - - - - - - - 76.681 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 76.681 - - - - - - - - - - - - 76.681 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 76.681 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Funding supports procurement of hardware to accommodate increased power requirements of SSBN modernization equipment. SSBN Legacy Interface Hardware supports emergent Engineering Change Proposals (ECPs) and hardware changes necessary to address significantly expanded power and infrastructure driven by required capability improvements. These funds support the conversion of the SSBN from a legacy Sonar system to the A-RCI model requiring upgrades to the power and infrastructure of the platform. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 14 of 42 P-1 Line #40 Volume 2 - 60 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSBN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 2 / SA101 SSBN LEGACY INTERFACE HARDWARE FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA101 SSBN LEGACY INTERFACE HARDWARE B Kits Recurring 1.1.1) SA101 SSBN LEGACY INTERFACE HARDWARE - NonOrganic (12) Subtotal: Recurring 7 / 41.846 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 41.846 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 41.846 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 41.846 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 41.846 Modification Item 1 of 1: SA101 SSBN LEGACY INTERFACE HARDWARE - / 34.835 / 0.000 - / 0.000 - / 34.835 Subtotal: Installation - / 34.835 / - - / 0.000 - / 34.835 - Subtotal: SA101 SSBN LEGACY INTERFACE HARDWARE Subtotal: Procurement, All Modification Items / 0.000 7 / 41.846 - - / - / 41.846 7 / 41.846 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 76.681 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 15 of 42 0.000 0.000 0.000 P-1 Line #40 0.000 0.000 0.000 76.681 Volume 2 - 61 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / SA101 SSBN LEGACY INTERFACE HARDWARE MDAP/MAIS Code: Modification Item 1 of 1: SA101 SSBN LEGACY INTERFACE HARDWARE Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: SA101 SSBN LEGACY INTERFACE HARDWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 7 / 34.835 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 7 / 34.835 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 34.835 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 7 / 34.835 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Out 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Footnotes: (12) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 16 of 42 P-1 Line #40 Volume 2 - 62 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / SA106 LOW COST CONFORMAL ARRAY KITS MDAP/MAIS Code: Prior Years 110.975 110.975 110.975 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 22.486 19.193 19.577 0.000 19.577 19.969 20.368 20.776 - - - - - - - - 22.486 19.193 19.577 0.000 19.577 19.969 20.368 20.776 - - - - - - - - 22.486 19.193 19.577 0.000 19.577 19.969 20.368 20.776 To FY 2031 Complete 21.191 Continuing - Continuing - 21.191 Continuing - Total - Continuing - - 21.191 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procurement of Low Cost Conformal Array (LCCA) to provide enhanced situational awareness and collision avoidance capability. [SA106 HULL SENSORS LOW COST CONFORMAL ARRAY KITS] Funding in FY 2027 provides for the installation of (2) arrays purchased in FY 2026 and the procurement of (2) additional arrays in FY 2027. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 17 of 42 P-1 Line #40 Volume 2 - 63 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / SA106 LOW COST CONFORMAL ARRAY KITS MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SA106 LOW COST CONFORMAL ARRAY KITS B Kits Recurring 1.1.1) SA106 HULL SENSORS LOW COST CONFORMAL ARRAY KITS - NonOrganic (13) Subtotal: Recurring Subtotal: SA106 LOW COST CONFORMAL ARRAY KITS Subtotal: Procurement, All Modification Items 18 / 82.219 - / 82.219 2 / 11.056 - 18 / 82.219 / 11.056 2 / 11.277 / 11.277 - 2 / 11.056 - / - / 11.503 - / - 2 / 11.503 - / - / 11.503 - / - - 2 / 11.277 / 11.277 2 / 11.503 - / 82.219 - / 11.056 Modification Item 1 of 1: SA106 LOW COST CONFORMAL ARRAY KITS - / 28.756 - / 11.430 - / 7.916 - / 8.074 Subtotal: Installation - / 28.756 - / 11.430 - / 7.916 - / 8.074 - - 2 / 11.503 / 11.503 - 2 / 11.733 / 11.503 - / 11.733 - 2 / 11.503 2 / 11.967 / 11.733 - / 11.967 - 2 / 11.733 2 / 12.207 / 11.967 - / 12.207 - 2 / 11.967 / 12.207 Continuing Continuing / 12.451 Continuing Continuing 2 / 12.451 Continuing Continuing / 12.451 Continuing Continuing - 2 / 12.207 - 2 / 12.451 - Installation - / 0.000 - / 8.074 - / 8.236 - / 8.401 - / 8.569 - / 8.740 - / 8.910 - / 99.032 / - - / 8.074 - / 8.236 - / 8.401 - / 8.569 - / 8.740 - / 8.910 - / 99.032 21.191 Continuing - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 110.975 22.486 19.193 19.577 0.000 UNCLASSIFIED Page 18 of 42 19.577 19.969 20.368 P-1 Line #40 20.776 Continuing Volume 2 - 64 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / SA106 LOW COST CONFORMAL ARRAY KITS MDAP/MAIS Code: Modification Item 1 of 1: SA106 LOW COST CONFORMAL ARRAY KITS Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: SYRACUSE, NY Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jan 2032 Installation Information Method of Implementation: SHIPALT:: Installation Name: SA106 HULL SENSORS LOW COST CONFORMAL ARRAY KITS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 15 / 28.756 3 / 11.430 - Prior Years / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 18 / 40.186 FY 2025 - / - - / - 2 / 7.916 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 7.916 FY 2026 - / - - / - - / - 2 / 8.074 0 / 0.000 2 / 8.074 - / - - / - - / - - / - 0 / 0.000 2 / 8.074 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 8.236 - / - - / - - / - 0 / 0.000 2 / 8.236 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 8.401 - / - - / - 0 / 0.000 2 / 8.401 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 8.569 - / - 0 / 0.000 2 / 8.569 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 8.740 0 / 0.000 2 / 8.740 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 8.910 2 / 8.910 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 8.740 2 / 8.910 Total 15 / 28.756 3 / 11.430 2 / 7.916 2 / 8.074 0 / 0.000 2 / 8.074 2 / 8.236 2 / 8.401 2 / 8.569 - / - 32 / 99.032 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 15 - - - 3 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 2 32 Out 15 - - - 3 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 2 32 Footnotes: (13) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, and newly awarded A-RCI Production Contract unit prices. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 19 of 42 P-1 Line #40 Volume 2 - 65 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / SA106 HIGH FREQUENCY SAIL ARRAY MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 44.361 7.266 4.732 7.612 0.000 7.612 2.391 0.000 0.000 0.000 0.000 66.362 Total - - - - - - - - - - - - 44.361 7.266 4.732 7.612 0.000 7.612 2.391 0.000 0.000 0.000 0.000 66.362 - - - - - - - - - - - - 44.361 7.266 4.732 7.612 0.000 7.612 2.391 0.000 0.000 0.000 0.000 66.362 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The High Frequency Sail Array (HFSA) provides high frequency active and passive capability supporting Anti-Submarine Warfare (ASW) and Anti-Surface Warfare (ASUW) for SSNs, and contact avoidance for SSNs and SSBNs. [SA106 HIGH FREQUENCY SAIL ARRAY] Funding in FY 2027 provides for the procurement of one (1) array and the installation of one (1) array purchased in FY 2026. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 20 of 42 P-1 Line #40 Volume 2 - 66 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSN, SSBN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 4 / SA106 HIGH FREQUENCY SAIL ARRAY FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA106 HIGH FREQUENCY SAIL ARRAY B Kits Recurring 1.1.1) SA106 HIGH FREQUENCY SAIL ARRAY NonOrganic (14) Subtotal: Recurring Subtotal: SA106 HIGH FREQUENCY SAIL ARRAY Subtotal: Procurement, All Modification Items 11 / 22.469 - / 22.469 1 / 2.253 - 11 / 22.469 / 2.253 1 / 2.298 - 1 / 2.253 / 2.298 - 1 / 2.298 1 / 2.344 - / - / 2.344 - / - 1 / 2.344 - / - - / - - / 22.469 - / 2.253 - / 2.298 - / 2.344 Modification Item 1 of 1: SA106 HIGH FREQUENCY SAIL ARRAY - / 21.892 - / 5.013 - / 2.434 - / 5.268 Subtotal: Installation - / 21.892 - / 5.013 - / 2.434 - / 5.268 1 / 2.344 - / - - / - - / - - / - - / - / 2.344 - / - - / - - / - - / - 1 / 2.344 - / - - / - - / - - / - - / 2.344 - / - - / - - / - - / - - / 0.000 - / 29.364 / 0.000 - / 5.268 - / 2.391 / 0.000 - / 0.000 - / 36.998 / - - / 5.268 - / 2.391 / - - / 0.000 - / 36.998 - / 0.000 14 / 29.364 - / - - / 29.364 14 / 29.364 Installation - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 44.361 7.266 4.732 7.612 0.000 UNCLASSIFIED Page 21 of 42 7.612 2.391 0.000 P-1 Line #40 0.000 0.000 0.000 66.362 Volume 2 - 67 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / SA106 HIGH FREQUENCY SAIL ARRAY MDAP/MAIS Code: Modification Item 1 of 1: SA106 HIGH FREQUENCY SAIL ARRAY Manufacturer Information Manufacturer Name: NUWC Neport Manufacturer Location: Newport, RI Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 Contract Dates Dec 2024 Dec 2025 Dec 2026 FY 2028 Delivery Dates May 2026 May 2027 May 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: SHIPALT:: Installation Name: SA106 HIGH FREQUENCY SAIL ARRAY Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 21.892 Prior Years 1 / 5.013 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 26.905 FY 2025 - / - - / - 1 / 2.434 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 2.434 FY 2026 - / - - / - - / - 1 / 5.268 0 / 0.000 1 / 5.268 - / - - / - - / - - / - 0 / 0.000 1 / 5.268 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 2.391 - / - - / - - / - 0 / 0.000 1 / 2.391 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.391 - / - - / - - / - 0 / 0.000 Total 10 / 21.892 1 / 5.013 1 / 2.434 1 / 5.268 0 / 0.000 1 / 5.268 14 / 36.998 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 - - - 1 - - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - 14 Out 10 - - - 1 - - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - 14 Footnotes: (14) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes install unit cost increases in FY25 and FY27 to account for installations not performed in concert with a SWFTS modernization. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 22 of 42 P-1 Line #40 Volume 2 - 68 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / SA106 OHIO CLASS LARGE VERTICAL ARRAY MDAP/MAIS Code: Prior Years 128.192 128.192 128.192 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 41.245 42.070 42.911 0.000 42.911 43.770 44.645 45.537 46.449 47.294 - - - - - - - - - - 41.245 42.070 42.911 0.000 42.911 43.770 44.645 45.537 46.449 47.294 - - - - - - - - - - 41.245 42.070 42.911 0.000 42.911 43.770 44.645 45.537 46.449 47.294 Total 482.113 482.113 482.113 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Large Vertical Array (LVA) provides improved detection and enhanced tactical situational awareness capability for tracking targets of interest, and supports acoustic superiority objectives for OHIO class submarines. SSBN systems will be approximately half the width of their SSN counterparts. This variance reflects the difference in mission, expected environment, and requirements. [SA106 OHIO CLASS LARGE VERTICAL ARRAY] Funding in FY 2027 provides for the procurement of one (1) array and the installation of (1) array procured in FY25. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 23 of 42 P-1 Line #40 Volume 2 - 69 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSBN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 5 / SA106 OHIO CLASS LARGE VERTICAL ARRAY FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA106 OHIO CLASS LARGE VERTICAL ARRAY B Kits Recurring 1.1.1) SA106 OHIO CLASS LARGE VERTICAL ARRAY - NonOrganic 5 / 97.199 (15) Subtotal: Recurring - Subtotal: SA106 OHIO CLASS LARGE VERTICAL ARRAY Subtotal: Procurement, All Modification Items / 97.199 1 / 20.862 - 5 / 97.199 / 20.862 1 / 21.279 - 1 / 20.862 / 21.279 - 1 / 21.279 1 / 21.705 - / - 1 / 21.705 / - - / - - / - - / 21.705 - / 22.139 - / 22.582 - / 23.033 - / 23.494 / 0.000 - / 21.206 - / 21.631 - / 22.063 - / 22.504 - / 22.955 / - - / 21.206 - / 21.631 - / 22.063 - / 22.504 - / 22.955 - / 97.199 - / 20.862 - / 21.279 - / 21.705 Modification Item 1 of 1: SA106 OHIO CLASS LARGE VERTICAL ARRAY - / 30.993 - / 20.383 - / 20.791 - / 21.206 Subtotal: Installation - / 30.993 - / 20.383 - / 20.791 - / 21.206 - 1 / 22.139 - 1 / 22.582 / 23.033 1 / 23.494 - - / 22.582 1 / 23.033 / 21.705 1 / 21.705 / 22.139 1 / 22.582 1 / 21.705 - / 21.705 1 / 22.139 - 1 / 23.033 - / 23.494 / 0.000 - 1 / 23.494 / - - / - 12 / 252.293 - / 252.293 12 / 252.293 / 0.000 - / 252.293 - / 47.294 - / 229.820 - / 47.294 - / 229.820 - Installation - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 128.192 41.245 42.070 42.911 0.000 UNCLASSIFIED Page 24 of 42 42.911 43.770 44.645 P-1 Line #40 45.537 46.449 47.294 482.113 Volume 2 - 70 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / SA106 OHIO CLASS LARGE VERTICAL ARRAY MDAP/MAIS Code: Modification Item 1 of 1: SA106 OHIO CLASS LARGE VERTICAL ARRAY Manufacturer Information Manufacturer Name: Electric Boat Manufacturer Location: Groton, CT Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2032 Installation Information Method of Implementation: TRID:: Installation Name: SA106 OHIO CLASS LARGE VERTICAL ARRAY Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 30.993 1 / 20.383 1 / 20.791 - / - - / - - / - - / - - / - 0 / 0.000 5 / 72.167 1 / 21.206 - / - - / - - / - - / - 0 / 0.000 1 / 21.206 1 / 21.631 - / - - / - - / - 0 / 0.000 1 / 21.631 1 / 22.063 - / - - / - 0 / 0.000 1 / 22.063 1 / 22.504 - / - 0 / 0.000 1 / 22.504 1 / 22.955 0 / 0.000 1 / 22.955 Prior Years - / - - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 23.413 1 / 23.413 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 23.881 1 / 23.881 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 3 / 30.993 1 / 20.383 1 / 21.206 / - FY 2025 1 / 20.791 0 / 0.000 1 / 21.206 0 / 0.000 1 / 21.206 1 / 21.631 1 / 22.063 1 / 22.504 - 1 / 22.955 / - - 2 / 47.294 / - 12 / 229.820 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 2 12 Out 3 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 2 12 Footnotes: (15) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Installation cost increases in FY25 represents updated installation contract pricing negotiated in FY23. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 25 of 42 P-1 Line #40 Volume 2 - 71 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY MDAP/MAIS Code: Prior Years 286.817 286.817 286.817 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 22.124 71.424 0.000 0.000 0.000 74.310 51.847 77.311 - - - - - - - - 22.124 71.424 0.000 0.000 0.000 74.310 51.847 77.311 - - - - - - - - 22.124 71.424 0.000 0.000 0.000 74.310 51.847 77.311 To FY 2031 Complete 78.857 Continuing - Continuing - 78.857 Continuing - Total - Continuing - - 78.857 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procurement of the VIRGINIA Class Large Vertical Array (LVA) provides improved detection and enhanced tactical situational awareness capability for tracking targets of interest, and supports acoustic superiority objectives for the VIRGINIA class submarines. SSN systems will be approximately twice the width of their SSBN counterparts. This variance reflects the difference in mission, expected environment, and requirements. [SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY] Funding in FY 2027 provides for the installation of one (1) array procured in FY 2025. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 26 of 42 P-1 Line #40 Volume 2 - 72 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 6 / SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY B Kits Recurring 1.1.1) SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY - NonOrganic (16) Subtotal: Recurring - / - / 225.859 - / - 5 / 225.859 - / - / 225.859 - / - - Subtotal: SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY Subtotal: Procurement, All Modification Items 5 / 225.859 - 1 / 48.857 - / - - / - - / - 1 / 50.831 / 48.857 - / - - / - - / - 1 / 48.857 - / - - / - - / - - / 48.857 - / - - / - - / - - / 50.831 / 0.000 - / 23.479 / - - / 23.479 - - / 50.831 1 / 51.847 / 51.847 - 1 / 50.831 1 / 52.884 - 1 / 51.847 - / 52.884 - 1 / 52.884 1 / 53.942 Continuing Continuing / 53.942 Continuing Continuing 1 / 53.942 Continuing Continuing Continuing / 51.847 - / 52.884 - / 53.942 Continuing / 0.000 - / 24.427 - / 24.915 - / 77.776 - / 256.246 / - - / 24.427 - / 24.915 - / 77.776 - / 256.246 Installation Modification Item 1 of 1: SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY - / 60.958 - / 22.124 - / 22.567 Subtotal: Installation - / 60.958 - / 22.124 - / 22.567 - / 0.000 - / - - / 0.000 / - - - - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 286.817 22.124 71.424 0.000 0.000 UNCLASSIFIED Page 27 of 42 0.000 74.310 51.847 P-1 Line #40 77.311 78.857 Continuing Continuing Volume 2 - 73 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY MDAP/MAIS Code: Modification Item 1 of 1: SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY Manufacturer Information Manufacturer Name: Electric Boat Manufacturer Location: Groton, CT Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2025 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Nov 2027 Nov 2029 Nov 2030 Nov 2032 Installation Information Method of Implementation: TBD:: Installation Name: SA106 VIRGINIA CLASS LARGE VERTICAL ARRAY Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 60.958 1 / 22.124 1 / 22.567 5 / 105.649 Prior Years - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - - / - - / - - / - 1 / 23.479 - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 24.427 - / - 0 / 0.000 1 / 24.427 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 24.915 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 25.414 1 / 25.414 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 25.922 1 / 25.922 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 26.440 1 / 26.440 1 / 22.567 - / - - / - - / - 1 / 23.479 - / - 1 / 24.915 3 / 77.776 11 / 256.246 Total 3 / 60.958 1 / 22.124 1 / 24.915 1 / 24.427 / - - / - 1 / 23.479 / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - 1 - - - 1 - - - - - - - 1 - - - - - - - 1 - - - 1 3 11 Out 3 - - - 1 - - - 1 - - - - - - - 1 - - - - - - - 1 - - - 1 3 11 Footnotes: (16) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, and installation contract prices. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 28 of 42 P-1 Line #40 Volume 2 - 74 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) MDAP/MAIS Code: Prior Years 290.752 290.752 290.752 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2.592 0.000 22.944 0.000 22.944 31.168 7.168 37.674 - - - - - - - - 2.592 0.000 22.944 0.000 22.944 31.168 7.168 37.674 - - - - - - - - 2.592 0.000 22.944 0.000 22.944 31.168 7.168 37.674 To FY 2031 Complete 23.993 Continuing - Continuing - 23.993 Continuing - Total - Continuing - - 23.993 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides technology insertion upgrade kits to previously installed A-RCI systems, providing the latest and most current capability and includes tech insertion to Legacy Replacement components on Los Angeles Class submarines. [SA303 688i TECHNOLOGY INSERTION KITS (SWFTS)] Funding in FY 2027 provides for the procurement of two (2) 688I insertion Kits. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 29 of 42 P-1 Line #40 Volume 2 - 75 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 7 / SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) B Kits Non-Recurring 1.1.1) SA303 688i TECHNOLOGY INSERTION KITS (SWFTS) - NonOrganic (17) Subtotal: Non-Recurring Subtotal: SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) Subtotal: Procurement, All Modification Items 32 / 217.326 - / - - / - / 217.326 - / - - / - 32 / 217.326 - / - - / - / 217.326 - / - - / - - - 2 / 22.944 - / - / 22.944 - / - 2 / 22.944 - / - / 22.944 - / - - - 2 / 22.944 / 22.944 - / 22.944 - / - / 24.140 - / - 2 / 24.140 - / - / 24.140 - / - - 2 / 22.944 - 2 / 24.140 - 3 / 37.674 / 37.674 - - 3 / 37.674 - 1 / 12.806 Continuing Continuing / 12.806 Continuing Continuing 1 / 12.806 Continuing Continuing Continuing / 37.674 - / 12.806 Continuing / 0.000 - / 11.187 - / 7.669 - / 109.070 / - - / 11.187 - / 7.669 - / 109.070 23.993 Continuing Installation Modification Item 1 of 1: SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) - / 73.426 - / 2.592 Subtotal: Installation - / 73.426 - / 2.592 - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / 7.028 - / 7.168 / - - / 7.028 - / 7.168 - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 290.752 2.592 0.000 22.944 0.000 UNCLASSIFIED Page 30 of 42 22.944 31.168 7.168 P-1 Line #40 37.674 Continuing Volume 2 - 76 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: SA303 688/688I TECHNOLOGY INSERTION KITS (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2030 FY 2031 Contract Dates Jan 2027 Jan 2028 FY 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2028 Jul 2029 Jul 2031 Jan 2032 Installation Information Method of Implementation: SHIPALT:: Installation Name: SA303 688i TECHNOLOGY INSERTION KITS (SWFTS) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 31 / 73.426 32 / 76.018 Prior Years 1 / 2.592 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 7.028 - / - - / - - / - 0 / 0.000 2 / 7.028 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 7.168 - / - - / - 0 / 0.000 2 / 7.168 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - 1 / 2.592 - / - - / - - / - - / - 2 / 7.028 2 / 7.168 - / - Total 31 / 73.426 3 / 11.187 / - - / - 0 / 0.000 3 / 11.187 / - 1 / 3.865 1 / 3.865 / - 1 / 3.804 1 / 3.804 3 / 11.187 2 / 7.669 41 / 109.070 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 31 - - - 1 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 2 41 Out 31 - - - 1 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 2 41 Footnotes: (17) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2 or later. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, and newly awarded A-RCI Production Contract unit prices. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 31 of 42 P-1 Line #40 Volume 2 - 77 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 64.777 3.845 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 64.777 3.845 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 64.777 3.845 0.000 0.000 0.000 0.000 0.000 0.000 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides technology insertion upgrade kits to previously installed A-RCI systems, providing the latest and most current capability and includes tech insertion to Legacy Replacement components on Seawolf Class submarines. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 32 of 42 P-1 Line #40 Volume 2 - 78 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 8 / SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) B Kits Recurring 1.1.1) SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) - NonOrganic (18) Subtotal: Recurring 6 / 47.266 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing / 47.266 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 6 / 47.266 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing - / 47.266 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Modification Item 1 of 1: SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) - / 17.511 - / 3.845 / 0.000 Continuing Continuing Subtotal: Installation - / 17.511 - / 3.845 / - Continuing Continuing 0.000 Continuing Continuing - Subtotal: SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) Subtotal: Procurement, All Modification Items Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 64.777 3.845 0.000 0.000 0.000 UNCLASSIFIED Page 33 of 42 0.000 0.000 0.000 P-1 Line #40 0.000 Volume 2 - 79 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: SHIPALT:: Installation Name: SA303 SSN 21 TECHNICAL INSERTION KITS (SWFTS) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 5 / 17.511 6 / 21.356 Prior Years 1 / 3.845 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 1 / 3.845 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Total 5 / 17.511 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 5 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - Cont. Cont. Out 5 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - Cont. Cont. Tot Footnotes: (18) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to supply chain delays. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 34 of 42 P-1 Line #40 Volume 2 - 80 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS MDAP/MAIS Code: Prior Years 312.507 312.507 312.507 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 75.975 69.171 75.605 0.000 75.605 95.141 - - - - - - 75.975 69.171 75.605 0.000 75.605 95.141 - - - - - - 75.975 69.171 75.605 0.000 75.605 95.141 130.649 130.649 130.649 111.634 111.634 111.634 To FY 2031 Complete 135.927 Continuing 135.927 Continuing Continuing 135.927 Total - Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides technology insertion upgrade kits to previously A-RCI installed systems on the VA Class Blocks I-III, providing the latest and most current capability. [SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK I-IV)] Funding in FY 2027 provides for the procurement of (2) VA TI (BLK 1-IV) kits and the installation of (4) kits procured in FY26. [SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK V + PSA)] Funding in FY 2027 provides for the procurement of (2) VA CL TI (BLK V) kit procured in FY25. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 35 of 42 P-1 Line #40 Volume 2 - 81 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS MDAP/MAIS Code: Models of Systems Affected: SSN Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS B Kits Recurring 1.1.1) SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK I-IV) - NonOrganic 27 / 242.996 (19) 1.1.2) SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK V + PSA) - NonOrganic - (20) Subtotal: Recurring Subtotal: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS Subtotal: Procurement, All Modification Items / - / 242.996 - 3 / 38.025 1 / 14.875 - 27 / 242.996 - 4 / 52.500 / 52.900 - 4 / 52.900 / - / 52.500 - 4 / 52.500 2 / 27.600 - / - 2 / 27.600 3 / 43.425 5 / 73.823 3 / 45.179 5 / 76.805 2 / 32.000 - / - 2 / 32.000 2 / 33.350 2 / 33.930 2 / 34.609 2 / 35.301 - / 59.600 - / - 4 / 59.600 - / - - / - - / 59.600 - / 76.775 / 0.000 - / 16.005 - / 18.366 / - - / 16.005 - / 18.366 / 242.996 - / 52.900 - / 52.500 - / 59.600 - / 59.600 - 4 / 59.600 / 76.775 / 107.753 - 5 / 76.775 - 7 / 107.753 / 79.788 / - Continuing 11 / 184.065 / 112.106 Continuing Continuing 7 / 112.106 Continuing Continuing / 112.106 Continuing Continuing - 5 / 79.788 Continuing / 107.753 - / 79.788 - / 22.896 - / 31.846 - / 23.821 - / 45.952 - / 268.143 - / 22.896 - / 31.846 - / 23.821 - / 45.952 - / 268.143 - - Installation Modification Item 1 of 1: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS - / 69.511 - / 23.075 - / 16.671 - / 16.005 Subtotal: Installation - / 69.511 - / 23.075 - / 16.671 - / 16.005 - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 312.507 75.975 69.171 75.605 0.000 UNCLASSIFIED Page 36 of 42 75.605 95.141 130.649 P-1 Line #40 111.634 135.927 Continuing Continuing Volume 2 - 82 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS MDAP/MAIS Code: Modification Item 1 of 1: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: SHIPALT:: Installation Name: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK I-IV) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 21 / 69.511 6 / 23.075 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 27 / 92.586 3 / 11.768 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 11.768 4 / 16.005 - / - - / - - / - - / - 0 / 0.000 4 / 16.005 - / - - / - - / - 0 / 0.000 2 / 8.162 3 / 12.488 - / - - / - 0 / 0.000 3 / 12.488 - / - 0 / 0.000 5 / 21.230 3 / 12.993 0 / 0.000 3 / 12.993 5 / 21.654 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 8.162 FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 21.654 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 13.253 3 / 13.253 3 / 12.993 8 / 34.907 55 / 210.139 Total 21 / 69.511 6 / 23.075 4 / 16.005 3 / 11.768 0 / 0.000 4 / 16.005 0 / 0.000 4 / 16.005 2 / 8.162 5 / 21.230 3 / 12.488 5 / 21.230 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 21 - - - 6 - - - 3 - - - 4 - - - 2 - - - 3 - - - 5 - - - 3 8 55 Out 21 - - - 6 - - - 3 - - - 4 - - - 2 - - - 3 - - - 5 - - - 3 8 55 LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 37 of 42 P-1 Line #40 Volume 2 - 83 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS MDAP/MAIS Code: Modification Item 1 of 1: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS Installation Information Method of Implementation: [none specified]:: Installation Name: SA303 VIRGINIA CLASS TECHNICAL INSERTION KITS (BLK V + PSA) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 4.903 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 10.204 - / - - / - - / - 0 / 0.000 2 / 10.204 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 10.408 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 10.616 - / - 0 / 0.000 2 / 10.616 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 10.828 0 / 0.000 2 / 10.828 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 11.045 2 / 11.045 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 4.903 - / - - / - - / - Installation Cost 2 / 10.408 2 / 10.204 2 / 10.408 2 / 10.616 - 2 / 10.828 / - - / - - / - - 2 / 11.045 / - 1 / 4.903 / - / - 11 / 58.004 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 1 - - - - - - - 2 - - - 2 - - - 2 - - - 2 2 11 Out - - - - - - - - 1 - - - - - - - 2 - - - 2 - - - 2 - - - 2 2 11 Footnotes: (19) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, and newly awarded A-RCI Production Contract unit prices. (20) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, installation cost increases for BLK V VA installs occurring in a Post-Shakedown Availability (PSA)starting in FY27, and newly awarded A-RCI Production Contract unit prices. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 38 of 42 P-1 Line #40 Volume 2 - 84 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) MDAP/MAIS Code: Prior Years 148.315 148.315 148.315 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 35.389 46.823 26.601 0.000 26.601 17.330 34.661 27.939 - - - - - - - - 35.389 46.823 26.601 0.000 26.601 17.330 34.661 27.939 - - - - - - - - 35.389 46.823 26.601 0.000 26.601 17.330 34.661 27.939 To FY 2031 Complete 23.084 Continuing - Continuing - 23.084 Continuing - Total - Continuing - - 23.084 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides sonar modernization to the SSBN (TRIDENT) Class Submarine Fleet. [SA303 SSBN TECHNICAL INSERTION CONVERSION (OHIO)] Funding in FY 2027 provides procurement of (1) additional kit and the installation of (2) kits procured in FY 2026. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 39 of 42 P-1 Line #40 Volume 2 - 85 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) MDAP/MAIS Code: Models of Systems Affected: SSBN Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) B Kits Non-Recurring 1.1.1) SA303 SSBN TECHNICAL INSERTION CONVERSION (OHIO) - NonOrganic (21) 17 / 83.566 1.1.2) SA303 SSBN CONVERSION (COLUMBIA) NonOrganic - (22) Subtotal: Non-Recurring Subtotal: SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) Subtotal: Procurement, All Modification Items - 2 / 20.968 / - / 83.566 - 17 / 83.566 2 / 21.692 / - / 20.968 1 / 15.325 / 83.566 - / 20.968 Modification Item 1 of 1: SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) - / 64.749 - / 14.421 Subtotal: Installation - / 64.749 - / 14.421 / 37.017 - 2 / 20.968 - 1 / 11.598 - 3 / 37.017 - / - / - - / - - 1 / 12.229 / - - / - - / - - / - - / 11.598 / 0.000 - / 15.003 - / 5.101 / - - / 15.003 - / 5.101 - / 11.598 - / 9.806 - / 15.003 - / 9.806 - / 15.003 / 12.229 - 1 / 11.598 1 / 12.473 / - / 11.598 - / 11.598 - 1 / 11.598 / 37.017 - 1 / 11.598 1 / 16.985 / 12.229 / 29.458 - 1 / 12.229 - - / - - 1 / 17.325 - 2 / 29.458 / 17.325 Continuing 1 / 17.671 - Continuing / - 4 / 67.306 / 17.671 Continuing Continuing 1 / 17.671 Continuing Continuing / 17.671 Continuing Continuing - 1 / 17.325 / - / 29.458 - / 17.325 - / 5.203 - / 10.614 - / 5.413 - / 5.521 - / 135.831 - / 5.203 - / 10.614 - / 5.413 - / 5.521 - / 135.831 23.084 Continuing - - Installation - Total Total Cost (Procurement + Support + Installation) LI 2150 - SSN Acoustic Equipment Navy 148.315 35.389 46.823 26.601 0.000 UNCLASSIFIED Page 40 of 42 26.601 17.330 34.661 P-1 Line #40 27.939 Continuing Volume 2 - 86 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 12 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: SHIPALT:: Installation Name: SA303 SSBN TECHNICAL INSERTION CONVERSION (OHIO) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 14 / 64.749 3 / 14.421 - 17 / 79.170 Prior Years / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - 2 / 9.806 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 9.806 FY 2026 - / - - / - - / - 2 / 10.002 - / - - / - - / - - / - 0 / 0.000 2 / 10.002 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 5.101 - / - - / - - / - 0 / 0.000 1 / 5.101 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 5.203 - / - - / - 0 / 0.000 1 / 5.203 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 5.307 - / - 0 / 0.000 1 / 5.307 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - 1 / 5.307 - / - 0 / 0.000 Total 14 / 64.749 3 / 14.421 2 / 10.002 2 / 9.806 0 / 0.000 2 / 10.002 0 / 0.000 2 / 10.002 1 / 5.101 1 / 5.203 24 / 114.589 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 14 - - - 3 - - - 2 - - - 2 - - - 1 - - - 1 - - - 1 - - - - - 24 Out 14 - - - 3 - - - 2 - - - 2 - - - 1 - - - 1 - - - 1 - - - - - 24 LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 41 of 42 P-1 Line #40 Volume 2 - 87 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2150 / SSN Acoustic Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: SA303 SSBN TECHNICAL INSERTION CONVERSION (SWFTS) Installation Information Method of Implementation: [none specified]:: Installation Name: SA303 SSBN CONVERSION (COLUMBIA) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 1 / 5.001 0 / 0.000 1 / 5.001 - / - - / - - / - - / - 0 / 0.000 1 / 5.001 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 5.307 - / - 0 / 0.000 1 / 5.307 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 5.413 0 / 0.000 1 / 5.413 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 5.521 1 / 5.521 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - 1 / 5.001 1 / 5.001 - / - - / - 1 / 5.307 Installation Cost 0 / 0.000 1 / 5.413 / - - 1 / 5.521 / - 4 / 21.242 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - 1 - - - - - - - - - - - 1 - - - 1 1 4 Out - - - - - - - - - - - - 1 - - - - - - - - - - - 1 - - - 1 1 4 Footnotes: (21) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases starting in FY25 to account for inflation, availability of system components, and newly awarded A-RCI Production Contract unit prices. (22) Supply chain delays have increased lead time from 12 months to as much as 18 months or longer. As a result, shipset deliveries starting in FY25 are now received in Q4 of a given fiscal year instead of what has in prior fiscal years been Q2. Once delivered, these shipsets are sent to platforms in the same quarter instead of what has been done in the past prior to the supply chain delays. Includes procurement and install unit cost increases to account for inflation, availability of system components, and newly awarded A-RCI Production Contract unit prices. LI 2150 - SSN Acoustic Equipment Navy UNCLASSIFIED Page 42 of 42 P-1 Line #40 Volume 2 - 88 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603512N, 0604518N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 14.247 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 184.603 184.603 184.603 To FY 2031 Complete - - - - - - - - - - 14.247 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - Total 198.850 198.850 - - - - - - - - - - 14.247 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 198.850 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - 1.298 - 1.298 1.245 - - - - 2.543 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: NOTE: Effective FY 2026, all funding and programs within OPN Budget Line Item (BLI) 2176 moved into OPN BLI 2136 in support of the Program Element (PE)/BLI consolidation initiative prescribed within the 'DoD Implementation Plan from the Commission on Planning, Programming, Budgeting and Execution (PPBE) Reform Final Report', to facilitate the effort to rapidly increase Navy Lethality in the Submarine and Surface Fleet. This Budget Line Item (BLI) consists of three separate and distinct programs, the OPNAV N98 sponsored Aircraft Carrier Tactical Support Center (CV-TSC) program, the OPNAV N96 sponsored Sonar Dome Rubber Windows (SDRW) program, and the OPNAV N2N6 sponsored Undersea Warfare Decision Support System (USW-DSS) program. Program Descriptions: AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC) (Cost Code VM301): The AN/SQQ-34 Aircraft Carrier Tactical Support Center (CV-TSC) program delivers Anti-Submarine Warfare (ASW) and Surface Warfare (SUW) combat capability to the Aircraft Carrier supporting Aircraft Carrier, Nuclear power (CVN) Tactical Action Office (TAO) and embarked Carrier Strike Group (CSG) Sea Combat Commander. The program provides validation and certification of Engineering Changes (ECs) fielded on CVNs and provides hardware/software changes/upgrades to previously fielded and in-production CV-TSC systems required to correct deficiencies identified through Fleet use, upgrade unreliable/ unsupportable components, replace obsolete components, and resolve Information Assurance (IA) issues. The program maintains interoperability with current and future interfaces to stay within the current performance envelope, supports mission data exchange, improves ASW/SUW track/sensor processing and analysis techniques, improves mission planning, improves data recording, reconstruction, and distribution, improves embedded simulation and training capabilities and implements cyber-security measures to effectively employ overall CVN Self Ship Defense System (SSDS) capabilities. CV-TSC integrates sensor data from organic Aircraft (MH-60R), organic platform sensors and tracks via Ship Self Defense System Product Line Architecture (PLA) and non-PLA, Link-16 track data, Global Command and Control System (GCCS) Over-the-Horizon track data, and Environmental and Threat Databases to assess the threat and assist the Tactical Action Officer and Carrier Strike Group to effectively employ overall CVN selfdefense capabilities. CV-TSC generates real-time ASW/SUW information and recommendations, tactical planning and employment of ASW/SUW assets, ASW/SUW sensor data processing and analysis, and distribution of tactically significant data. Aircraft supported include: MH-60R/S Seahawk, P-8 Poseidon, MQ-4C Triton, and future ASW/SUW non-organic supporting platforms. SONAR DOME RUBBER WINDOWS (SDRWs) (Cost Code VM401): AN/SQS-53 Sonar Dome Rubber Windows (SDRWs) are installed on all CG47 and DDG51 class ships (Initial Capabilities Document (ICD) for ASW, AN/SQQ-89(V) Operational Requirements Document (ORD) (#667-76-05 dated August 2005). This program provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 1 of 7 P-1 Line #41 Volume 2 - 89 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603512N, 0604518N Line Item MDAP/MAIS Code: N/A fatigue, and impact damage. Ships with a severely damaged SDRW need to be dry-docked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced self-noise and by providing increased source level receiving and sensitivity resulting from reduced attenuation. This program provides production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments of production systems and field service engineering; and completion of engineering design work and material tests. This program also provides drawings, configuration management information, incorporation of new design and fabrication technology, incorporation of lessons learned and required testing, and constructs sub-elements to confirm single-stage cure of the SDRW production process. UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) (Cost Code VM601): USW-DSS is the Navy Program of Record ASW Command and Control (C2) Net-Centric system supporting the warfighter. USW-DSS provides an integrated, near-real time, net-centric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) for the Carrier Strike Groups (CSGs). USW-DSS is a C2 capability identified in the ASW Initial Capabilities Document (ICD), for the Sea Combat Commander (SCC) and Theater USW Commander (TUSWC). USW-DSS enables effective planning and execution of Undersea Warfare (USW) operations, optimizes placement of sensors for exploitation of the environment, manages available resources, balances operations versus risk, and provides a clear vulnerability assessment of the operational environment. USW-DSS shortens C2 decision processes for detection-to-engagement across multiple platforms, including those with low bandwidth communications or intermittent connectivity. Tactical data such as tracks, environmental, and sensor processing data is ingested into USW-DSS through platform specific interfaces such as the AN/SQQ-89(V) Surface Ship ASW Combat System, the Global Command and Control System - Maritime (GCCS-M), and Aircraft Carrier Tactical Support Center (CV-TSC). USW-DSS processes this and other tactical data and supports intelligent dissemination of the data to unit level and theater level platforms in support of an enhanced USW tactical picture. USW-DSS provides USW Commanders with an expanded, net-centric USW collaborative capability across CSG platforms (CVNs, CGs, DDGs) as well as supporting shore nodes to include: Theater Undersea Warfare Command Headquarters (TUSWCHQ), the Naval Oceanographic Processing Facility (NOPF), and Tactical Operations Center (TOC) and Mobile Tactical Operations Center (M-TOC). On afloat platforms, USW-DSS processing software is virtualized for portability and is hosted on the Integrated Shipboard Network System (ISNS) and Consolidated Afloat Networks and Enterprise Services (CANES) systems and implements a Service-Oriented Architecture (SOA) with display generation and operator interfaces provided via USW-DSS hardware. For support and ashore nodes, USW-DSS processing software is hosted on Commercial Off The Shelf (COTS) hardware. USW-DSS capability improvements are phased to deliver timely and cost-effective software improvements to the warfighter via the Build / Fleet Capability Release (FCR) process funded under the USW-DSS RDT&EN Program Element (PE) 0604518N Project 3094 development program, for transition and fielding via the USW-DSS OPN BLI 2176 program. USW-DSS procurements are installed on CSG platforms and supporting shore nodes via permanent Ship Alterations (SHIPALTs). Workstation procurements are required to support ISNS and CANES configured ships as well as shore nodes. See the following for a description of all P-40a cost items that comprise this budget: [P40A / CV-TSC Technology Insert/Refresh & ECP Implementation]: Item Number 1.1 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades to previously fielded and in-production CV-TSC AN/SQQ-34 systems. Funding used to implement ECPs to correct deficiencies identified through Fleet use; upgrade unreliable components; replace obsolete components; and address Information Assurance (IA) issues. [P40A / SDRW Procurement]: Item Number 2.1 - Procure SDRWs, shipping fixtures, and fairing angles for emergency replacement on all CG47 and DDG51 class hulls. This line provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, fatigue, and impact damage. Ships with a severely damaged SDRW need to be dry-docked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. [P40A / SDRW Production Support]: Item Number 2.2 - Funding is provided for production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments, and field service engineering; and complete engineering design work and material tests. This program also provides drawings, configuration management information, new design and fabrication technology, incorporation of lessons learned and required testing, and construct sub-elements to confirm single-stage cure. [P40A / USW-DSS Shore Sites and Tactical Trainers]: Item Number 3.1 - Reflects the procurement of USW-DSS Build 2 technical training environments and Build 3 shore systems to include theater, maritime operations centers, tactical operations centers, and training centers, hosted via general services secret and top-secret networks. Systems consist of the necessary computational hardware, servers, network architecture, software, user licenses and workstations to support from 2-10 simultaneous users. LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 2 of 7 P-1 Line #41 Volume 2 - 90 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603512N, 0604518N Line Item MDAP/MAIS Code: N/A [P40A / USW-DSS Tech Refresh]: Item Number 3.2 - Tech Refreshes are defined as hardware and software upgrades to existing USW-DSS systems and include upgrades to both legacy USW-DSS Build 2 Revision 3 (B2R3) afloat systems and Build 3 ashore systems. Starting in FY 2025, this line will include Tech Refreshes for Build 3 afloat systems. Through USW-DSS Tech Refreshes, targeted architecture improvements developed under USW-DSS RDT&EN Program Element 0604518N Project 3094 via Build 3 Fleet Capability Release (FCR) will facilitate the migration of key components of USW-DSS onto existing installed systems for Fleet use. USW-DSS Tech Refreshes will include the latest cybersecurity patches, mitigate/resolve obsolescence issues, and improve software scalability, while installing the latest integrated, near-real time, netcentric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) on an electronic Master Tactical Plot (eMTP). Each year, USW-DSS is required to perform Tech Refreshes for afloat B2R3 systems to stay compatible with the Consolidated Afloat Network and Enterprise Services (CANES) hosting environment when CANES undergoes system upgrades to prevent loss of functionality. Each year, USW-DSS Build 3 ashore systems at Theater USW Command Headquarters (TUSWCHQ) sites are updated to provide additional capability, bug fixes, and cybersecurity upgrades. Starting in FY 2025, USW-DSS Build 3 afloat systems will also receive additional capability, bug fixes, and cybersecurity updates biennially. [P40A / USW-DSS Engineering Changes (ECs)]: Item Number 3.3 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades. Funding will be used to support Reliability, Maintainability, and Availability (RM&A) modifications, correct deficiencies identified through Fleet use, and upgrade of unreliable components. [P40A / USW-DSS System Technical Support]: Item Number 3.4 - Funding is for USW-DSS program Software Support Activity (SSA) efforts in performing the following functions: generation/assessment of Software Problem Reports (SPRs)/Software Trouble Reports (STRs); responding to Fleet software change requests; Configuration Management (CM); software Quality Assurance (QA); software installation automation; and software recovery support. [P40A / USW-DSS Production Support]: Item Number 3.5 - Consists of on-site engineering support; Consolidated Afloat Network and Enterprise Services (CANES) Integrated Product Team (IPT) Support; Information Assurance (IA) certification support; production quality assurance; system sustainability support; Integrated Logistics Support (ILS) product updates/support; status reporting and technical briefings; program office support; and all other production support efforts directly related to delivery of USW-DSS to both the Integrated Shipboard Network System (ISNS) and CANES systems, and ultimately to the Fleet. [P40A / USW-DSS CANES Software Shipsets]: Item Number 3.6 - Consists of initial loads of the USW-DSS Build 2 Revision 3 (B2R3) afloat system on new Consolidated Afloat Network and Enterprise Services (CANES) equipped ships. The last USW-DSS B2R3 system was procured in FY 2024. [P40A / USW-DSS Theater ASW (TASW) Build Out]: Item Number 3.7 - Consists of the initial fielding, commencing in FY 2024, of the latest USW-DSS Build 3 baseline loaded on Consolidated Afloat Network and Enterprise Services (CANES) equipped ships that did not have USW-DSS previously installed. Hosting USW-DSS Build 3 on the CANES shipboard network reduces hardware costs while improving system sustainment. This line also reflects the additional requirement, also commencing in FY 2024, to upgrade legacy USW-DSS Build 2 Revision 3 (B2R3) systems to the Build 3 baseline. The USW-DSS Build 3 system is more complex and incorporates additional tactical data links than the legacy B2R3 baseline. Build 3 data is shared at the general services Secret and Top-Secret level, creating additional complexity. This expanded list of tactical data allows for better communication and expanded data fusion for ship-to-ship, ship-to-shore, shore-to-shore, and shore-to-aircraft information sharing. These added tactical data links require additional effort to establish and validate during system delivery. LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 3 of 7 P-1 Line #41 Volume 2 - 91 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 2: Ship Sonars ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0603512N, 0604518N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Undersea Warfare Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 184.603 - / 14.247 - / 184.603 - / 14.247 - / / 0.000 - / / 0.000 - / / 0.000 - / / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 4 of 7 P-1 Line #41 Volume 2 - 92 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Undersea Warfare Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) VM301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC) 1.1) CV-TSC Technology Insert/ Refresh & ECP Implementation A 1.2) CV-TSC Minotaur Multi-Sensor Fused Track Build Out A Subtotal: 1) VM301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC) - - 16.959 - - 1.439 - - - - - - - - - - - - - - 4.276 - - - - - - - - - - - - - - - - - 21.235 - - 1.439 - - - - - - - - - - - - 2,588K 21 54.350 2,549K 2.549 - - - - - - - - - - - - - - 13.524 - - 0.418 - - - - - - - - - - - - - - 67.874 - - 2.967 - - - - - - - - - - - - 2) VM401 - SONAR DOME RUBBER WINDOW (SDRW) 2.1) SDRW Procurement (†) A 2.2) SDRW Production Support Subtotal: 2) VM401 - SONAR DOME RUBBER WINDOW (SDRW) 1 3) VM601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) 3.1) USW-DSS Shore Sites and Tactical A (†) Trainers 3.2) USW-DSS Tech (†) A Refresh 762,269.23 26 19.819 711,634.00 6 4.270 - - - - - - - - - - - - 161,419.05 105 16.949 139,633.92 10 1.396 - - - - - - - - - - - - 3.3) USW-DSS Engineering Changes (ECs) - - 13.784 - - 1.227 - - - - - - - - - - - - 3.4) USW-DSS System Technical Support - - 18.410 - - 1.486 - - - - - - - - - - - - 3.5) USW-DSS Production Support - - 16.719 - - 1.039 - - - - - - - - - - - - 90,115.79 95 8.561 - - - - - - - - - - - - - - - 313,000.00 4 1.252 105,792.36 0.423 - - - - - - - - - - - - 3.6) USW-DSS CANES Software Shipsets A (†) 3.7) USW-DSS Theater ASW (TASW) A (†) Build Out 4 Subtotal: 3) VM601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) - - 95.494 - - 9.841 - - - - - - - - - - - - Total - - 184.603 - - 14.247 - - - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 5 of 7 P-1 Line #41 Volume 2 - 93 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 LI 2176 - Undersea Warfare Support Equipment Navy P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment UNCLASSIFIED Page 6 of 7 Aggregated Items Title: Undersea Warfare Support Equipment P-1 Line #41 Volume 2 - 94 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 2 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 2176 / Undersea Warfare Support Equipment Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Undersea Warfare Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) VM401 - SONAR DOME RUBBER WINDOW (SDRW) 2.1) SDRW Procurement 2.1) SDRW Procurement 2.1) SDRW Procurement 2.1) SDRW Procurement 2022 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA Jun 2022 Jun 2024 1 2,402K Y 2023 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA Apr 2023 Apr 2025 1 2,450K Y 2024 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA Jun 2024 Jun 2026 3 2,165K Y 2025 Collins Aerospace Systems (formerly Goodrich) / Jacksonville, FL SS / FP NAVSEA Jul 2025 Jul 2027 1 2,549K Y 3) VM601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS) 3.1) USW-DSS Shore Sites and Tactical Trainers 2023 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2022 Apr 2023 9 684,000.00 Y 3.1) USW-DSS Shore Sites and Tactical Trainers 2024 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2023 Apr 2024 6 697,680.00 Y 3.1) USW-DSS Shore Sites and Tactical Trainers 2025 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2024 Apr 2025 6 711,634.00 Y 2023 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2022 Apr 2023 14 134,212.00 Y 2024 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2023 Apr 2024 28 136,896.00 Y 2025 Progeny Systems, Corporation / Manassas, VA C / CPFF NAVSEA Nov 2024 Apr 2025 10 139,633.92 Y 3.6) USW-DSS CANES Software Shipsets 2023 NUWC/Keyport / Keyport, WA WR NAVSEA Oct 2022 Jan 2023 7 98,940.00 Y 3.6) USW-DSS CANES Software Shipsets 2024 NUWC/Keyport / Keyport, WA WR NAVSEA Oct 2023 Jan 2024 1 100,919.00 Y 3.7) USW-DSS Theater ASW (TASW) Build Out 2024 NUWC/Keyport / Keyport, WA WR NAVSEA Oct 2023 Mar 2024 4 103,718.00 Y 3.7) USW-DSS Theater ASW (TASW) Build Out 2025 NUWC/Keyport / Keyport, WA WR NAVSEA Nov 2024 Apr 2025 4 105,792.36 Y 3.2) USW-DSS Tech Refresh 3.2) USW-DSS Tech Refresh 3.2) USW-DSS Tech Refresh LI 2176 - Undersea Warfare Support Equipment Navy UNCLASSIFIED Page 7 of 7 P-1 Line #41 Volume 2 - 95 === page 176 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 96 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 309.442 309.442 309.442 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 51.514 56.482 68.881 0.000 68.881 63.097 65.919 65.070 - - - - - - - - 51.514 56.482 68.881 0.000 68.881 63.097 65.919 65.070 To FY 2031 Complete - Total - 66.820 Continuing - Continuing - 66.820 Continuing - Continuing - - - - - - - - - - 51.514 56.482 68.881 0.000 68.881 63.097 65.919 65.070 66.820 Continuing Continuing 4.781 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.484 - 4.729 - 4.729 4.224 3.980 5.154 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Submarine Acoustic Warfare System (SAWS) program provides submarines with expendable defensive countermeasures and the systems necessary to launch them against torpedo and acoustic sensor threats. This program provides ongoing production of countermeasure devices needed to sustain fleet inventories, improvements to enhance the readiness and effectiveness of countermeasure devices and associated External Countermeasure Launcher (ECL) systems on all U.S. submarines. Acoustic Device Countermeasures (ADC) are expendable devices produced in two primary versions. The Internal Countermeasure Launcher (ICL) launches the 3" ADCs and ECL Systems launch the 6" devices. WM014 6 Inch Countermeasures: Funding under this cost code procures and supports 6" Countermeasures, ADC MK3 (torpedo), and ADC MK4 (SONAR) countermeasures for submarine protection. The effort includes unit costs of the new devices, reworks, and the system engineering, which covers the associated support costs at the Technical Design Agent (TDA) and In-Service Engineering Activity (ISEA). For every procurement of 6-inch ADC, supplementary MK77 shall be procured. WM015 3 Inch Countermeasures: Funding under this cost code procures and supports 3" Countermeasures ADC MK2 for submarine protection. This effort includes the unit costs of the devices as well as the system engineering services, which covers the associated support costs at the TDA and ISEA. The effort also includes procurement of an enhanced ADC MK2 MOD 8/9 that provides the Fleet with greater functionality. WM018 Acoustic Augmentation Support Program (AASP): Funding under this cost code provides acoustic augmentation systems in appropriate configurations for all submarine classes (except SEAWOLF). The equipment is installed as temporary equipment Temporary Alteration (TEMPALT) until Ship Alterations (SHIPALTs) can be permanently installed to reduce sustainment costs and provide a long-term solution. A combination of new procurement systems and refurbished systems are required to complete installations. Reliability and refurbishment upgrades provide current in-service AASP systems with new components and software updates to maintain reliability. AASP new procurements are required a year prior to installation and refurbished systems are required the same year as installation. WM019 Countermeasure Set, Acoustic (CSA) Program: Funding under this cost code procures and supports the inboard electronic system necessary for preparing and launching 6" ADCs from all 688i and newer U.S. submarines. This inboard system consists of the Torpedo Defense Controller (TDC), Launch Control Panels (LCPs), and associated cabling, in a class-by-class configuration. The CSA program continually modernizes and technical refreshes system hardware and software. Five efforts are supported: (1) The "CSA SWFTS Integration" effort is maintaining the integration of the CSA system with the SWFTS System of Systems (SoS). Implementation of a phased approach allowed incremental implementation of capabilities. Required funding addresses recurring upgrades within the SWFTS Technology Insertion (TI)/Advanced Processor Build (APB) cycles to maintain compatibility with networked tactical systems and continue to reduce cybersecurity risks. (2) The ongoing "CSA MK4 Technology Insertion" effort replaces the CSA MK2 MOD2 with a SubTDS-capable, SWFTS-integrated CSA MK4 system on VIRGINIA Class Block I and II submarines (10 hulls). (3) The "CSA SEAWOLF SWFTS Integration" effort LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 1 of 32 P-1 Line #42 Volume 2 - 97 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A replaces the CSA MK2 MOD5 system being installed on the SEAWOLF Class submarines (3 hulls) with a SubTDS-capable, SWFTS-integrated CSA system. The non-recurring engineering effort (to develop the SHIPALT drawings that address mounting and cable changes and the software development effort in support of the MK5 system going on the SEAWOLF) began in FY21 with fielding beginning in FY23 as part of the SWFTS TI-22 baseline. (4) The "CSA SWFTS Virtualization" effort supports the development and integration of the CSA system with the AN/BYG-1 Combat Control System on VIRGINIA and COLUMBIA new construction hulls. (5) The fifth effort is the ongoing support for engineering issues across all CSA systems as they arise. WM022 MK77 Gas Generator (GG): Funding under this cost code procures and supports Gas Generators used to launch 6-inch devices from the submarine. The effort includes unit costs of the new devices, reworks, and the system engineering which covers the associated support costs at the TDA and ISEA. Gas Generators are required on a one for one basis with 6-inch devices (ADC MK3, MK4, CRAW and ADC MK6). WM025 Compact Rapid Attack Weapon (CRAW): Funding under this cost code procures the required integration kits and other required submarine support equipment for the CRAW MK58 torpedo. The MK58 torpedo provides enhanced Anti-Submarine Warfare (ASW) and Anti-Torpedo Torpedo (ATT) mission capabilities to the submarine Force. The MK58 torpedo is launched from VIRGINIA Class (VACL) submarines via the integration kits for the ECL and payload control system that are procured from this line item. Note, the MK58 torpedoes will be procured separately via WPN (LI 3121). VB700 Payload Procurement: Funding under this cost code extends the sensor range of the submarine. The SLUAS All-Up-Round (UAR) includes the unmanned aerial vehicle (UAV), launch canister, submarine communication link, and auxiliary support equipment. Procurement of SLUAS AURs include the UAV, launch, canister, and supporting auxiliary equipment. This line-item support procurement of SLUAS AUR units, payload systems engineering, ISEA and TDA activities to sustain the system. Funding also supports industrial base capacity stabilization to address obsolescence and/or manufacturability of payload systems. WM830 Production Engineering: Production engineering support from SAWS TDA and ISEA across all SAWS systems. Provides specification preparation and validation, government prepared production acceptance procedures, production planning, integrated logistics support, planning coordination of government furnished information and government furnished equipment, and contract administration including contract deliverable monitoring and prime contractor monitoring of cost / schedule performance. [P40A / WM014 6 INCH]: The 6" Countermeasures program procures, reworks, and refreshes ADC MK3 devices, ADC MK4 devices, and associated launch tubes in order to maintain submarine fleet countermeasure device inventory levels in accordance with the Naval Munition Requirements Process (NMRP). The 6" Countermeasure program tracks and implements device improvements through configuration control and an Engineering Change Proposal (ECP) process. [P40A / WM015 3 INCH]: The 3" Countermeasures program procures ADC MK2 MOD 7 and ADC MK 5 countermeasure devices in order to maintain submarine fleet inventory levels in accordance with the NMRP. The 3" Countermeasures program tracks and implements device improvements through configuration control and the ECP process. [P40A / WM022 GAS GENERATOR MK77]: The MK77 Gas Generator (GG) program provides the energetic device used as the impulse mechanism for launching 6 inch ADC MK3 and ADC MK4 on VIRGINIA, OHIO, LOS ANGELES Improved and SEAWOLF classes. MK77 GG rework is the complete disassembly and refurbishment of a GG that has been deployed and then reassembled for fleet use with replacement of the inert hardware. MK77 GG Mod 1 is the new procurement unit design to replace the obsolete propellant formulation of the MOD 0 while retaining the same fit and function. [P40A / WM830 PRODUCTION ENGINEERING]: Production engineering support from SAWS Technical Design Agent (TDA) and In-Service Engineering Agent (ISEA) across all SAWS systems. Provides specification preparation and validation, government prepared production acceptance procedures, production planning, integrated logistics support, planning coordination of government furnished information and government furnished equipment, and contract administration including contract deliverable monitoring and prime contractor monitoring of cost/ schedule performance. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 2 of 32 P-1 Line #42 Volume 2 - 98 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Acoustic Warfare System - / 164.890 - / 30.244 - / 30.925 - / 37.947 / - - / 37.947 P-3a 1 / AASP WM018 (SHIPALT) - / 45.527 - / 9.977 - / 9.527 - / 18.626 - / 0.000 - / 18.626 P-3a 2 / CSA WM019 (SHIPALT, OCMOD, EC) - / 89.306 - / 3.397 - / 5.734 - / 6.012 - / 0.000 - / 6.012 P-3a 3 / CRAW WM025 (Integration Kit) - / 9.719 - / 7.896 - / 10.296 - / 6.296 - / 0.000 - / 6.296 P-40 Total Gross/Weapon System Cost / 309.442 - / 51.514 - / 56.482 - / 68.881 - / 0.000 - / 68.881 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Acoustic Warfare System P-3a 1 / AASP WM018 (SHIPALT) P-5a, P-21 - - / 13.739 / - - P-3a 2 / CSA WM019 (SHIPALT, OCMOD, EC) - / 6.297 - / 5.398 - / 5.126 P-3a 3 / CRAW WM025 (Integration Kit) - / 6.754 - / 10.991 - / 13.995 P-40 Total Gross/Weapon System Cost - / 63.097 - / 65.919 - / 65.070 - - / / 13.490 - / / 12.533 - / - - / / 33.525 - / - / 9.965 - / 166.909 - / 3.945 Continuing - / 14.959 Continuing Continuing / 66.820 Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2026 to FY 2027 funding increase by $12.399M is due to ADC MK2 procurements (WM015), AASP SSBN procurements/installations (WM018), CSA TI-26 upgrades (WM019), and increased MK77 Gas Generator procurements (WM022). LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 3 of 32 P-1 Line #42 Volume 2 - 99 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Submarine Acoustic Warfare System Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) WM014 6 INCH 1.1) 6" Countermeasure Launch Tube A 1.2) ADC MK3 NEW A 1.3) ADC MK3 NON RECURRING A 1.4) MK 3 ADC A (†) (†) SLEP 98,914.29 105 40,003.72 1,074 10.386 - - - 29,960.00 1.498 79 7.924 211,920.00 10 0.357 - - - 35,700.00 211,920.00 10 0.357 42.964 222,812.50 16 25 5.298 - - - 25 5.298 7.787 - - - - - - - - - - - - - - - 30,993.83 162 5.021 - - - - - - - - - - - - - - - 1.5) ADC MK4 NEW (†) A 70,026.79 112 7.843 - - - 1.6) MK 4 ADC SLEP A 15,275.86 29 0.443 - - - - - 1.7) Systems Engineering A Subtotal: 1) WM014 6 INCH 35,700.00 - - 3.565 100,303.80 50 156,720.00 25 3.918 290,800.00 10 2.908 - - - 10 2.908 - - - - - - - 290,800.00 - - - - - 4.558 - - - - - - - - - - - - - - - - - 79.002 - - 3.565 - - 13.340 - - 8.563 - - - - - 8.563 3,767 26.160 1,688 15.632 - - - 850 13.183 - - - 850 13.183 - - 2.839 - - - - - 2.176 - - - - - - - - - - - 0.650 - - 0.552 - - - - - - - - - - - - - - 29.649 - - 16.184 - - 2.176 - - 13.183 - - - - - 13.183 13,593.27 1,694 23.027 - - - - - - 78,741.94 93 7.323 - - - 78,741.94 93 7.323 9,495.58 791 7.511 158 3.495 108 4.887 0.00 93 0.000 - - - 0.00 93 0.000 15,433.33 30 0.463 - - - - - - - - - - - - - - - - - 2.540 - - 0.200 - - 0.376 - - - - - - - - - - - 33.541 - - 3.695 - - 5.263 - - 7.323 - - - - - 7.323 - - 16.231 - - 0.260 - - 0.302 - - 0.300 - - - - - 0.300 - - 16.231 - - 0.260 - - 0.302 - - 0.300 - - - - - 0.300 2) WM015 3 INCH 2.1) ADC MK2 (1)(†) 2.3) Systems Engineering A A (2) 2.4) ADC MK2 SONAR Development A Subtotal: 2) WM015 3 INCH 6,944.52 9,260.66 15,509.41 15,509.41 3) WM022 GAS GENERATOR MK77 3.1) GAS GENERATOR MK77 MOD 1 NEW PRODUCTION A (3)(†) 3.2) GAS GENERATOR MK77 MOD 0 REWORK A (4) 3.3) GAS GENERATOR MK77 A (†) RESTORE 3.4) SYSTEMS ENGINEERING A Subtotal: 3) WM022 GAS GENERATOR MK77 22,120.25 45,250.00 4) WM830 PRODUCTION ENGINEERING 4.1) PRODUCTION ENGINEERING A Subtotal: 4) WM830 PRODUCTION ENGINEERING LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 4 of 32 P-1 Line #42 Volume 2 - 100 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Acoustic Warfare System FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 5) WM900 CONSULTING SERVICES 5.1) CONSULTING SERVICES A - - 6.467 - - 0.501 - - - - - - - - - - - - - - 6.467 - - 0.501 - - - - - - - - - - - - - - - - - - - - - 48 6.194 - - - 48 6.194 - - - - - 6.039 - - 9.844 - - 2.384 - - - - - 2.384 Subtotal: 6) VB700-PAYLOAD PROCUREMENT - - 0.000 - - 6.039 - - 9.844 - - 8.578 - - - - - 8.578 Total - - 164.890 - - 30.244 - - 30.925 - - 37.947 - - - - - 37.947 Subtotal: 5) WM900 CONSULTING SERVICES 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 6.2) PAYLOAD SYSTEMS ENGINEERING AND CAPACITY STABILIZATION (5)(†) A 129,041.67 A (6) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 129,041.67 indicates the presence of a P-5a Footnotes: (1) Funding from FY 2026 to FY 2027 increased by $13.183M due to no procurements in FY 2026. To take advantage of step-ladder pricing, 54 additional units procured in FY 2025, an an additional 81 devices were procured using remaining FY 2024 funds. In FY 2026 the majority of the ADC MK 2 (WM015) funding was transferred to procure MK 3 and MK 4 devices. (2) (3) (4) (5) Funding from FY 2026 to FY 2027 decrease of $2.176M due to no procurements in FY 2027. FY 2026 to FY 2027 funding increase of $7.323M due to supporting procurement of MK77 Gas Generators Inventory increase for the Fleet. MK77 Gas Generators (GGs) transition from QTY 47 reworks in FY 2026 to QTY 93 new production units in FY 2027 to support long-term inventory plan. Quantities converted from shipset (6 shipsets; 8 AURs/shipset) to individual AUR units in FY 2027 and follow on years to support SLUAS procurement. Funding in FY 2025 realigned to Payload Systems Engineering and Capacity Stabilization in support of Blackwing 10-C UAV sustainment and commencement of system technical refresh. (6) Payload Systems Engineering and Capacity Stabilization line supports stabilization for payload obsolescence and/or manufacturability, including SLUAS manufacturing and/or payload launch and support equipment. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 5 of 32 P-1 Line #42 Volume 2 - 101 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Aggregated Items: Submarine Acoustic Warfare System Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) WM014 6 INCH 1.2) ADC MK3 NEW (†) 2021 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Jun 2021 Sep 2023 94 70,212.77 Y 1.2) ADC MK3 NEW (†) 2022 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Oct 2021 May 2024 120 42,075.00 Y 1.2) ADC MK3 NEW (†) 2023 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Oct 2022 Jan 2025 81 53,938.27 Y 1.2) ADC MK3 NEW (†) 2024 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Jul 2024 Jun 2025 70 55,828.57 Y 1.2) ADC MK3 NEW (†) 2025 ULTRA / BRAINTREE, MA C / FFP WASH NAVY YARD Jan 2026 Jan 2027 16 222,812.50 Y 1.2) ADC MK3 NEW (†) 2026 ULTRA / BRAINTREE, MA C / FFP WASH NAVY YARD Jan 2026 Aug 2026 79 100,303.80 Y 1.2) ADC MK3 NEW (†) 2027 ULTRA / BRAINTREE, MA C / FFP WASH NAVY YARD May 2027 May 2028 25 211,920.00 Y 1.4) MK 3 ADC SLEP (†) 2021 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Oct 2020 Nov 2021 41 15,829.27 Y 1.4) MK 3 ADC SLEP (†) 2022 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Oct 2021 Nov 2022 80 10,675.00 Y 1.5) ADC MK4 NEW (†) 2021 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Jun 2021 Dec 2021 37 77,675.68 Y 1.5) ADC MK4 NEW (†) 2023 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Jun 2023 Dec 2023 25 61,360.00 Y 1.5) ADC MK4 NEW (†) 2024 ULTRA / BRAINTREE, MA C / FFP NUWC/KEYPORT Jul 2024 May 2025 25 71,400.00 Y 1.5) ADC MK4 NEW (†) 2026 ULTRA / BRAINTREE, MA C / TBD WASH NAVY YARD Jan 2026 Aug 2026 25 156,720.00 Y 1.5) ADC MK4 NEW (†) 2027 TBD / TBD C / TBD WASH NAVY YARD May 2027 Dec 2027 10 290,800.00 Y 8,492.25 Y 2) WM015 3 INCH 2.1) ADC MK2 (1)(†) 2022 ULTRA / BRAINTREE, MA C / IDIQ WASH NAVY YARD Jul 2022 Mar 2023 258 2.1) ADC MK2 (1)(†) 2023 ULTRA / BRAINTREE, MA C / IDIQ WASH NAVY YARD Jul 2023 Mar 2024 384 8,184.90 Y 2.1) ADC MK2 (1)(†) 2024 ULTRA / BRAINTREE, MA C / IDIQ WASH NAVY YARD Jul 2024 Oct 2025 244 12,254.10 Y 2.1) ADC MK2 (1)(†) 2025 ULTRA / BRAINTREE, MA C / IDDQ WASH NAVY YARD Apr 2025 Jan 2026 1,688 9,260.66 Y 2.1) ADC MK2 (1)(†) 2027 ULTRA / BRAINTREE, MA C / IDIQ WASH NAVY YARD May 2027 May 2028 850 15,509.41 Y 2022 NSWC/INDIAN HEAD / NSWC INDIAN HEAD WR NSWC INDIAN HEAD Oct 2021 Aug 2023 50 26,563.46 Y 2023 NSWC/INDIAN HEAD / NSWC INDIAN HEAD WR NSWC INDIAN HEAD Oct 2022 Feb 2024 25 33,784.62 Y 2024 NSWC/INDIAN HEAD / NSWC INDIAN HEAD WR NSWC INDIAN HEAD Oct 2023 Sep 2024 65 24,907.69 Y 2027 NSWC/INDIAN HEAD / NSWC INDIAN HEAD C / TBD NSWC INDIAN HEAD Oct 2026 Jul 2028 93 78,741.94 Y 3) WM022 GAS GENERATOR MK77 3.1) GAS GENERATOR MK77 MOD 1 NEW PRODUCTION (3) 3.1) GAS GENERATOR MK77 MOD 1 NEW PRODUCTION (3) 3.1) GAS GENERATOR MK77 MOD 1 NEW PRODUCTION (3) 3.1) GAS GENERATOR MK77 MOD 1 NEW PRODUCTION (3) LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 6 of 32 P-1 Line #42 Volume 2 - 102 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Item Number / Title [DODIC] 3.3) GAS GENERATOR MK77 RESTORE O O C P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Method/Type or Funding Vehicle Aggregated Items: Submarine Acoustic Warfare System Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 NSWC/INDIAN HEAD / NSWC INDIAN HEAD WR NSWC INDIAN HEAD Oct 2023 Sep 2024 30 15,433.33 N TBD / TBD C / TBD NUWC NPT Oct 2026 Dec 2027 48 129,041.67 Y (Each) RFP Issue Date Feb 2024 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT (5)(†) (†) 2027 (7) Mar 2026 indicates the presence of a P-21 Footnotes: (7) Technical refresh of AUR will be through an Other Transaction Authroity (OTA) Agreement. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 7 of 32 P-1 Line #42 Volume 2 - 103 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Submarine Acoustic Warfare System Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT PROC QTY Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) WM014 6 INCH 1.2) ADC MK3 NEW Prior Years Deliveries: 709 1 2021 NAVY 94 0 94 2 2022 NAVY 120 0 120 A - - - - - - - - - - - - - - - - 94 A - - - - - - - - - - - - 120 1 2023 NAVY 81 0 81 81 1 2024 NAVY 70 0 70 70 1 2025 NAVY 16 0 16 16 3 2026 NAVY 79 0 79 79 3 2027 NAVY 25 0 25 25 1.4) MK 3 ADC SLEP Prior Years Deliveries: 41 4 2021 NAVY 41 0 41 4 2022 NAVY 80 0 80 A - - - - - - - - - - - - - - - - - - - - - 20 14 A - - 7 - - - - - - - - - - 80 - - 20 17 1.5) ADC MK4 NEW Prior Years Deliveries: 25 7 2021 NAVY 37 0 37 6 2023 NAVY 25 0 25 A - - - - 25 0 6 2024 NAVY 25 0 25 25 6 2026 NAVY 25 0 25 25 5 2027 NAVY 10 0 10 10 2) WM015 3 INCH 2.1) ADC MK2 (1) Prior Years Deliveries: 2881 8 2022 NAVY 258 0 258 8 2023 NAVY 384 0 384 A - - - 258 8 2024 NAVY 244 0 244 244 8 2025 NAVY 1,688 0 1,688 1,688 8 2027 NAVY 850 0 850 850 0 48 384 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 9 2027 NAVY 48 (5) 48 O C T N O V LI 2210 - Submarine Acoustic Warfare System Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 104 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Submarine Acoustic Warfare System Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT PROC QTY Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) WM014 6 INCH 1.2) ADC MK3 NEW Prior Years Deliveries: 709 1 2021 NAVY 94 0 94 - - - - - - - - - - - 8 8 7 7 2 2022 NAVY 120 0 120 - - - - - - - - - - - - 8 - 8 - 8 - 8 - 8 - 8 - 8 - 8 10 10 10 10 10 70 0 1 2023 NAVY 81 0 81 A - - - - - - - - - - - - - - - - - - - - - - - - 81 1 2024 NAVY 70 0 70 A - - - 70 1 2025 NAVY 16 0 16 16 3 2026 NAVY 79 0 79 79 3 2027 NAVY 25 0 25 25 1.4) MK 3 ADC SLEP Prior Years Deliveries: 41 4 2021 NAVY 41 27 14 14 4 2022 NAVY 80 0 80 - 0 10 10 10 10 10 10 10 10 0 1.5) ADC MK4 NEW Prior Years Deliveries: 25 7 2021 NAVY 37 37 0 6 2023 NAVY 25 0 25 0 6 2024 NAVY 25 0 25 6 2026 NAVY 25 0 25 25 5 2027 NAVY 10 0 10 10 A - - - - - - 3 3 3 3 3 3 3 3 1 A - 0 - - 25 2) WM015 3 INCH 2.1) ADC MK2 (1) Prior Years Deliveries: 2881 8 2022 NAVY 258 0 258 8 2023 NAVY 384 0 384 - - - - - 8 56 24 40 24 8 2024 NAVY 244 0 244 8 2025 NAVY 1,688 0 1,688 1,688 8 2027 NAVY 850 0 850 850 0 48 A - - 28 32 - 28 - - - 18 - - - - - - - 52 52 0 52 52 52 A - 52 52 - - 20 244 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 9 2027 NAVY 48 (5) 48 O C T N O V LI 2210 - Submarine Acoustic Warfare System Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 105 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Submarine Acoustic Warfare System Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT PROC QTY Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) WM014 6 INCH 1.2) ADC MK3 NEW Prior Years Deliveries: 709 1 2021 NAVY 94 94 0 2 2022 NAVY 120 50 70 10 10 10 10 10 10 10 0 1 2023 NAVY 81 0 81 - - - 9 8 8 8 1 2024 NAVY 70 0 70 - - - 1 2025 NAVY 16 0 16 A - - - - - - - - - 16 3 2026 NAVY 79 0 79 A - - - - - - - 10 10 59 3 2027 NAVY 25 0 25 25 - - - 0 6 - - 6 6 6 6 6 6 6 10 10 10 10 10 10 10 0 0 1.4) MK 3 ADC SLEP Prior Years Deliveries: 41 4 2021 NAVY 41 41 0 0 4 2022 NAVY 80 80 0 0 0 1.5) ADC MK4 NEW Prior Years Deliveries: 25 7 2021 NAVY 37 37 0 6 2023 NAVY 25 25 0 6 2024 NAVY 25 0 25 6 2026 NAVY 25 0 25 5 2027 NAVY 10 0 10 0 - - - - - - - 3 3 3 3 3 3 3 3 1 0 A - - - - - - - 2 2 21 10 2) WM015 3 INCH 2.1) ADC MK2 (1) Prior Years Deliveries: 2881 8 2022 NAVY 258 258 0 8 2023 NAVY 384 364 20 20 0 8 2024 NAVY 244 0 244 - 8 2025 NAVY 1,688 0 1,688 8 2027 NAVY 850 0 850 0 48 0 - - - - - - - - - - - 55 54 54 54 27 A - - - - - - - - - 31 68 0 128 120 120 67 - - - 1,154 850 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 9 2027 NAVY 48 (5) 48 O C T N O V LI 2210 - Submarine Acoustic Warfare System Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 106 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Submarine Acoustic Warfare System Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT PROC QTY Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) WM014 6 INCH 1.2) ADC MK3 NEW Prior Years Deliveries: 709 1 2021 NAVY 94 94 0 0 2 2022 NAVY 120 120 0 0 1 2023 NAVY 81 81 0 0 1 2024 NAVY 70 70 0 1 2025 NAVY 16 0 16 - - - 8 8 3 2026 NAVY 79 20 59 10 10 10 10 10 3 2027 NAVY 25 0 25 0 0 9 0 A - - - - - - - - - - - - 10 9 3 3 0 1.4) MK 3 ADC SLEP Prior Years Deliveries: 41 4 2021 NAVY 41 41 0 0 4 2022 NAVY 80 80 0 0 1.5) ADC MK4 NEW Prior Years Deliveries: 25 7 2021 NAVY 37 37 0 0 6 2023 NAVY 25 25 0 0 6 2024 NAVY 25 25 0 6 2026 NAVY 25 4 21 5 2027 NAVY 10 0 10 0 2 2 2 2 2 2 2 2 2 A - 3 - 0 - - - - - 2 2 2 2 2 0 2) WM015 3 INCH 2.1) ADC MK2 (1) Prior Years Deliveries: 2881 8 2022 NAVY 258 258 0 0 8 2023 NAVY 384 384 0 0 8 2024 NAVY 244 244 0 8 2025 NAVY 1,688 534 1,154 8 2027 NAVY 850 0 850 0 48 0 - 120 100 120 120 140 140 140 140 134 - - A - 0 - - - - - - - - - 99 99 99 99 99 355 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 9 2027 NAVY 48 (5) A O C T N O V LI 2210 - Submarine Acoustic Warfare System Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 32 S E P O C T N O V 48 D E C 0 J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 107 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Submarine Acoustic Warfare System Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT PROC QTY Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) WM014 6 INCH 1.2) ADC MK3 NEW Prior Years Deliveries: 709 1 2021 NAVY 94 94 0 0 2 2022 NAVY 120 120 0 0 1 2023 NAVY 81 81 0 0 1 2024 NAVY 70 70 0 0 1 2025 NAVY 16 16 0 0 3 2026 NAVY 79 79 0 0 3 2027 NAVY 25 25 0 0 1.4) MK 3 ADC SLEP Prior Years Deliveries: 41 4 2021 NAVY 41 41 0 0 4 2022 NAVY 80 80 0 0 1.5) ADC MK4 NEW Prior Years Deliveries: 25 7 2021 NAVY 37 37 0 0 6 2023 NAVY 25 25 0 0 6 2024 NAVY 25 25 0 0 6 2026 NAVY 25 25 0 0 5 2027 NAVY 10 10 0 0 2) WM015 3 INCH 2.1) ADC MK2 (1) Prior Years Deliveries: 2881 8 2022 NAVY 258 258 0 0 8 2023 NAVY 384 384 0 0 8 2024 NAVY 244 244 0 0 8 2025 NAVY 1,688 1,688 0 8 2027 NAVY 850 495 355 48 0 0 99 99 99 49 9 0 6) VB700-PAYLOAD PROCUREMENT 6.1) PAYLOAD PROCUREMENT 9 2027 NAVY 48 (5) 0 O C T N O V LI 2210 - Submarine Acoustic Warfare System Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #42 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 108 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Production Rates (Each / Year) MFR Ref # Aggregated Items: Submarine Acoustic Warfare System Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 ULTRA - BRAINTREE, MA 25 95 216 0 0 0 0 7 2 27 29 2 ULTRA - BRAINTREE, MA 25 95 216 0 0 0 0 7 2 31 33 3 ULTRA - BRAINTREE, MA 25 95 216 0 0 7 7 0 0 2 2 0 0 13 13 0 0 13 13 4 ULTRA - BRAINTREE, MA TBD 5 TBD - TBD 10 25 72 0 6 6 12 0 6 6 12 6 ULTRA - BRAINTREE, MA 10 25 72 0 6 6 12 0 6 6 12 7 ULTRA - BRAINTREE, MA 10 25 72 0 6 6 12 0 6 6 12 8 ULTRA - BRAINTREE, MA 540 1,056 1,800 0 1 8 9 0 1 8 9 0 0 6 6 0 0 6 6 9 TBD - TBD TBD "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 13 of 32 P-1 Line #42 Volume 2 - 109 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / AASP WM018 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 45.527 9.977 9.527 18.626 0.000 18.626 13.739 13.490 12.533 9.965 33.525 - - - - - - - - - - - 45.527 9.977 9.527 18.626 0.000 18.626 13.739 13.490 12.533 9.965 33.525 - - - - - - - - - - - 45.527 9.977 9.527 18.626 0.000 18.626 13.739 13.490 12.533 9.965 33.525 Total 166.909 166.909 166.909 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AASP provides acoustic augmentation systems in appropriate configurations for all submarine classes (except SEAWOLF) installed as temporary equipment via a Temporary Alteration until SHIPALTs can be permanently installed to reduce sustain cost and provide a long term solution. Reliability and refurbishment upgrades provide current in service AASP systems with new components and software updates to maintain reliability. AASP new procurements are required a year prior to installation and in refurbished systems the same year as installation. [WM018 AASP Support] Includes production support for BLK I-IV SHIPALTs and the AASP reliability and refurbishment upgrade. [WM018 AASP] Includes costs of procuring new systems including HLF-1/VLF, for SHIPALTs 4678KP and 5039KP. [WM018 AASP Reliability and Refurbishment Upgrade] Reliability and refurbishment upgrade to sustain in-service AASP systems. [WM018 AASP] Non-recurring costs to produce/update AASP SHIPALTs alteration packages. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 14 of 32 P-1 Line #42 Volume 2 - 110 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AASP WM018 MDAP/MAIS Code: Models of Systems Affected: AN/BQT-1 Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AASP WM018 B Kits Recurring 1.1.1) WM018 AASP Support - Organic 1.1.2) WM018 AASP - NonOrganic - (8) 1.1.3) WM018 AASP Reliability and Refurbishment Upgrade - NonOrganic 1.1.4) SSBN Procurement and Install - NonOrganic Subtotal: Recurring / 3.530 - 15 / 14.547 (9) 3 / 0.316 - (10) / - / 0.698 - / - 3 / 3.088 / 0.628 1 / 3.222 2 / 6.735 - / - 2 / 6.735 3 / 5.028 1 / 1.710 2 / 3.487 2 / 4.424 7 / 13.130 36 / 55.371 - 1 / 0.123 - / - - / - - - - 1 / 0.132 1 / 0.167 3 / 0.399 9 / 1.137 5 / 4.663 - / - / 12.096 - / - - / - - / - - 2 / 3.097 - / - 2 / 3.097 - - / / - / 0.654 - - / - - / 18.393 - / 3.716 - / 3.999 - / 10.389 - / 0.851 - / 0.205 - - / 0.698 - / - 5 / 4.663 - / - 4 / 3.703 / 12.096 - / 0.454 / 9.185 - / 0.570 - / - 4 / 3.151 / 5.431 - / 0.679 - / / 4.298 - - / 1.028 - - / / 5.619 / 3.588 - - / - / 11.829 13 / 11.517 / 17.117 - / 79.854 / - - / - - / 11.445 2 / 4.131 - / - 12 / 19.214 - - Non-Recurring 1.2.1) WM018 AASP - Organic (11) 1.2.2) WM018 AASP Obsolescence Management Organic - (12) Subtotal: Non-Recurring Subtotal: AASP WM018 Subtotal: Procurement, All Modification Items - / - / 10.389 - 18 / 28.782 / / 0.851 2 / 2.403 - 3 / 4.567 / 2.608 / 3.097 - / - - 9 / 15.193 - / - 9 / 15.193 / 15.193 - / - - 4 / 6.607 / - - / 28.782 - / 4.567 - / 6.607 Modification Item 1 of 1: AASP WM018 - / 16.745 - / 5.410 - / 2.920 - / 3.433 Subtotal: Installation - / 16.745 - / 5.410 - / 2.920 - / 3.433 - / - - 2 / 3.115 / 3.097 / 15.193 - - - / 3.115 - 2 / 3.212 - 9 / 12.300 - / - / 3.212 / - - 2 / 3.256 - 7 / 8.643 / 3.256 - 5 / 7.554 / 4.131 5 / 9.750 - / 0.000 10 / 17.117 / 12.300 - / 8.643 - / 7.554 - / 9.750 - / 17.117 - / 30.659 70 / 110.513 / 110.513 - Installation - / 0.000 - / 3.433 - / 1.439 - / 4.847 - / 4.979 - / 0.215 - / 16.408 - / 56.396 / - - / 3.433 - / 1.439 - / 4.847 - / 4.979 - / 0.215 - / 16.408 - / 56.396 - Total Total Cost (Procurement + Support + Installation) LI 2210 - Submarine Acoustic Warfare System Navy 45.527 9.977 9.527 18.626 0.000 UNCLASSIFIED Page 15 of 32 18.626 13.739 13.490 P-1 Line #42 12.533 9.965 33.525 166.909 Volume 2 - 111 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AASP WM018 MDAP/MAIS Code: Modification Item 1 of 1: AASP WM018 Manufacturer Information Manufacturer Name: Sparton DeLeon Springs, LLC Manufacturer Location: DeLeon Springs, FL Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Nov 2031 FY 2030 FY 2031 Manufacturer Name: NUWC Newport Manufacturer Location: Newport, RI Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Oct 2025 Oct 2029 Oct 2030 Delivery Dates Dec 2026 Dec 2030 Dec 2031 Installation Information Method of Implementation: AIT:: Installation Name: WM018 AASP Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 12 / 13.272 Prior Years 3 / 5.410 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 18.682 FY 2025 - / - - / - 3 / 2.920 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 2.920 FY 2026 - / - - / - - / - 2 / 2.433 0 / 0.000 2 / 2.433 - / - - / - - / - - / - 0 / 0.000 2 / 2.433 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 1.439 - / - - / - - / - 0 / 0.000 1 / 1.439 FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 4.847 - / - - / - 0 / 0.000 3 / 4.847 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.847 - / - 0 / 0.000 1 / 4.847 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.132 0 / 0.000 2 / 0.132 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.084 2 / 0.084 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 10.706 7 / 10.706 2 / 0.132 9 / 10.790 36 / 46.090 Total 12 / 13.272 3 / 5.410 3 / 2.920 2 / 2.433 0 / 0.000 2 / 2.433 1 / 1.439 3 / 4.847 1 / 4.847 Installation Schedule FY 2025 PYS In 12 Out 12 FY 2026 Q1 Q2 Q3 Q4 3 - - - - - - 3 Q1 Q2 2 - - - FY 2027 Q3 Q4 1 - - LI 2210 - Submarine Acoustic Warfare System Navy 3 FY 2028 Q1 Q2 Q3 Q4 2 - - - - - - 2 FY 2029 Q1 Q2 Q3 Q4 1 - - - - - - 1 UNCLASSIFIED Page 16 of 32 FY 2030 Q1 Q2 Q3 Q4 3 - - - - - - 3 FY 2031 Q1 Q2 Q3 Q4 1 - - - - - - P-1 Line #42 1 Q1 Q2 Q3 Q4 TC Tot 2 - - - 9 36 - - 9 36 - 2 Volume 2 - 112 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AASP WM018 MDAP/MAIS Code: Modification Item 1 of 1: AASP WM018 Installation Information Method of Implementation: AIT:: Installation Name: WM018 AASP Reliability and Refurbishment Upgrade Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 3.473 Prior Years 3 / 3.473 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 1 / 1.000 0 / 0.000 1 / 1.000 - / - - / - - / - - / - 0 / 0.000 1 / 1.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.132 - / - 0 / 1.000 1 / 1.132 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.083 0 / 0.000 1 / 0.083 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 4.618 3 / 4.618 Total 3 / 3.473 - / - - / - 1 / 1.000 1 / 1.000 - / - - / - 1 / 0.132 1 / 0.083 3 / 5.618 9 / 10.306 0 / 0.000 / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - - - - - - - 1 - - - - - - - - - - - - 1 - - - 1 - 3 9 Out 3 - - - - - - - - - - - - - - - - - - - - - 3 9 - - 1 - 1 - 1 Method of Implementation: [none specified]:: Installation Name: SSBN Procurement and Install Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 5 / 0.000 0 / 0.000 5 / 0.000 - / - - / - - / - - / - 0 / 0.000 5/ - FY 2028 - / - - / - - / - - / - - / - - / - 4 / 0.000 - / - - / - - / - 0 / 0.000 4/ - FY 2029 - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 - / - - / - 0 / 0.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 17 of 32 P-1 Line #42 / - 4/ - Volume 2 - 113 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AASP WM018 MDAP/MAIS Code: Modification Item 1 of 1: AASP WM018 Installation Information Method of Implementation: [none specified]:: Installation Name: SSBN Procurement and Install Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - 5 / 0.000 0 / 0.000 5 / 0.000 4 / 0.000 4 / 0.000 - - 0 / 0.000 13 / - Total / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 5 - - - 4 - - - 4 - - - - - - - - - - - 13 Out - - - - - - - - - - - - - - - - - - - - - - - - 13 5 - - Method of Implementation (Organic): WM018 AASP Obsolescence Management 4 - 4 Installation Quantity: 12 Footnotes: (8) Includes production support for SHIPALTs, included Technical Direction Agent, Software Support Agent and Information Assurance efforts for Virginia Blocks I-V. Cost increase to support the TI/APB Integration efforts and cyber security. (9) FY 2026 to FY 2027 funding increase of $3.513 M due to additional QTY procurements from 1 to 2 units. (10) (11) (12) FY 2026 to FY 2027 funding increase by $4.663M to support SSBN AASP procurements and backfit installations. This is a new fleet driven requirement beginning in 2027. FY 2026 to FY 2027 funding decreased by $0.205M due to the down-ramp and completion of the Very Low Frequency (VLF) transducer technical refresh effort. FY 2026 to FY 2027 funding increase by $0.694M due to increase in VLF transducer price. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 18 of 32 P-1 Line #42 Volume 2 - 114 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 89.306 3.397 5.734 6.012 0.000 6.012 6.297 5.398 5.126 - - - - - - - - - 89.306 3.397 5.734 6.012 0.000 6.012 6.297 5.398 5.126 - - - - - - - - - 89.306 3.397 5.734 6.012 0.000 6.012 6.297 5.398 5.126 To FY 2031 Complete - Total - 3.945 Continuing - Continuing - 3.945 Continuing - Continuing - - 3.945 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The CSA program procures and supports the inboard electronic system necessary for preparing and launching 6" ADCs from all 688i and newer U.S submarines. This inboard system consists of the TDC, Launch Control Panels (LCPs), and associated cabling, in a class by class configuration. The CSA program continually modernizes systems currently in the fleet and upgrades hardware and software to support new SWFTS TI/APB Builds. NOTE: Beginning in FY20, the WM019 budget was restructured to align the CSA development and procurement efforts with the SWFTS TI/APB model. The changes reallocated funding entirely within the WM019 subhead to support current and future SWFTS development efforts. This restructuring will provide clarity to the recurring development and procurement costs associated with CSA systems and upgrades within the SWFTS TI/APB model. [WM019 CSA Engineering Changes - Organic] [WM019 CSA Engineering Changes - Organic] Technology insertion effort that supports and designs engineering changes for the Countermeasure Set, Acoustic (CSA) systems fielded on all 688i and newer U.S. submarines. This supports changes to correct obsolescence issues, modernization to divest legacy systems improving force readiness, and engineering changes necessary to accommodate modified devices and new devices. [WM019 CSA Technology Insertion (TI-22) Upgrade Kits NonOrganic] Procures CSA Technology Insertion to upgrade legacy CSA MK2 MOD 5 systems to TI-22 on SEAWOLF Class submarines. [WM019 CSA Technology Insertion (TI-24) Upgrade Kits NonOrganic] Procures CSA Technology Insertion to upgrade fielded SWFTS-integrated CSA systems from TI-16 and TI-20 to TI-24 on VIRGINIA Class submarines. The significant change from prior budgets is the removal of CSA MK 5 from the planned TI-24 installations. The Common Weapon Launcher (CWL) is planned to be fielded with ADC launch capability starting with TI-24 on VACL Blocks III, IV, and V. CSA MK 4 installations of TI-24 remain. [WM019 CSA Technology Insertion (TI-26) Upgrade Kits NonOrganic] Procures CSA Technology Insertion to upgrade fielded SWFTS-integrated CSA systems from TI-16 and TI-24 to TI-26 on VIRGINIA Class submarines. The significant change from prior budgets is the removal of CSA MK 5 from the planned TI-26 installations. The CWL is planned to be fielded with ADC launch capability starting with TI-24 on VACL Blocks III, IV, and V. CSA MK 4 installations of TI-26 remain. [WM019 CSA SWFTS VIRTUALIZATION - Organic] Nonrecurring costs for the upgrade, verification, validation and integration of CSA functionality with the AN/BYG-1 Combat Control System and the Payload Control System (PCS) on SWFTS. CSA Virtualization effort supports advanced integration of the CSA system with the AN/BYG-1 Combat Control System on VIRGINIA and COLUMBIA new construction hulls. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 19 of 32 P-1 Line #42 Volume 2 - 115 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: [WM019 CSA SEA WOLF SWFTS Integration - Organic] Nonrecurring costs for the upgrade, validation, verification, and SHIPALT with the goal of modernizing SEAWOLF class with CSA equipment currently being fielded on VIRGINIA Class platforms. The remaining fiscal years are expected to finalize all necessary equipment integration, resolve deficiencies found during testing and attain all necessary certifications for each of the three SEAWOLF class submarines. [WM019 CSA ISEA] WM019 - CSA ISEA Supports engineering issues across all systems and platforms as they arise. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 20 of 32 P-1 Line #42 Volume 2 - 116 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Models of Systems Affected: Countermeasure Set Acoustic Prior Years Modification Type: SHIPALT, OCMOD, EC FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CSA WM019 B Kits Recurring 1.1.1) WM019 CSA MK3 Engineering Changes (LAN, SWFTS, TDA) - Organic - / 13.348 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Continuing Continuing 1.1.2) WM019 ECPs CSA MK2 MOD 2 Conversion to MK 4 - Organic - / 8.320 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.3) WM019 CSA MK2 MOD 0 OBSOLESCENCE Organic 42 / 6.004 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 42 / 6.004 1.1.4) WM019 CSAMK2 MOD2 CONVERSION to CSA MK4 - NonOrganic 9 / 4.226 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 4.226 1.1.5) WM019 CSA MK3 Kits and Systems NonOrganic 9 / 1.865 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 1.865 / 3.616 - / - 1.1.6) WM019 CSA Engineering Changes - Organic Organic (13) - / 11.736 - / 0.958 - / 2.149 - - / 3.616 - / 3.929 - / 3.422 - / 3.760 - / 2.945 Continuing Continuing 1.1.7) WM019 CSA Technology Insertion (TI-20) Upgrade Kits NonOrganic - NonOrganic 13 / 4.681 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / 4.681 1.1.8) WM019 CSA Technology Insertion (TI-22) 4 / 2.038 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.038 5 / 2.998 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.998 - - / - - / - 1 / 0.640 - / - 1 / 0.640 - / - - / - - / - - / - - / - 1 / 0.640 / 4.256 - / - / 2.945 Continuing Continuing / - - / - - / - - / 3.305 / 0.375 - / - / 0.375 - / 3.937 / - - / - / - - / 8.998 Upgrade Kits NonOrganic - NonOrganic (14) 1.1.9) WM019 CSA Technology Insertion (TI-24) Upgrade Kits NonOrganic - NonOrganic (15) 1.1.10) WM019 CSA Technology Insertion (TI-26) Upgrade Kits NonOrganic - NonOrganic (16) Subtotal: Recurring - / - / 55.216 - / 0.958 / 2.149 - - / 4.256 - / 3.929 - / 3.422 - / 3.760 - - Non-Recurring 1.2.1) WM019 CSA SWFTS VIRTUALIZATION Organic - Organic - / 2.795 - / 0.510 1.2.2) WM019 CSA SEA WOLF SWFTS Integration Organic - Organic - / 2.178 - / 0.533 1.2.3) WM019 CSA MK2 MOD 2 Conversion to CSA MK4 - Organic - / 8.998 Subtotal: Non-Recurring Subtotal: CSA WM019 Subtotal: Procurement, All Modification Items - - / - / / 0.476 - / 13.971 - / 1.043 - / 0.476 - / 2.001 - / 2.625 / 69.187 - / 2.001 - / 2.625 - LI 2210 - Submarine Acoustic Warfare System Navy - / - 82 / 69.187 - - - - / 0.375 - / - 1 / 4.631 - / - / 4.631 - / - UNCLASSIFIED Page 21 of 32 - - / - - / - - / - - / - - / - / 0.375 - / - - / - - / - - / - / - - / - - / - - / - - / - / 0.375 / - - - / 3.929 - / 3.422 - / 3.760 - / 2.945 Continuing Continuing / 4.631 - / 3.929 - / 3.422 - / 3.760 - / 2.945 Continuing Continuing - / - P-1 Line #42 - / - - 1 / 4.631 - / - - - / 0.375 - / 16.240 Volume 2 - 117 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Countermeasure Set Acoustic Prior Years Financial Plan Modification Number / Title: 2 / CSA WM019 Modification Type: SHIPALT, OCMOD, EC FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Support (All Modification Items) 2.1) WM019 CSA ISEA - / 14.438 2.2) WM019 CSA Technology insertion (TI-28) Upgrade Kits Subtotal: Support - - / - / 0.951 - - / - / 1.406 - - / - - / 14.438 - / 0.951 - / 1.406 - - / 1.381 - / - / - - / - - / 1.381 - / - - / 0.000 - / 1.381 - - / - / 1.063 - 2 / 1.305 / 1.381 - / 0.000 - / 0.856 - 1 / 0.666 / 1.366 - / 2.368 - / 1.522 - / 0.000 - / 0.454 - / - - / 0.454 - / - / 1.000 - / 1.366 - / 0.000 - Continuing / - - Continuing / - 3 / 1.971 / 1.000 Continuing Continuing / 0.000 - / 0.575 - / 8.858 / - - / 0.575 - / 8.858 3.945 Continuing Installation Modification Item 1 of 1: CSA WM019 - / 5.681 - / 0.445 - / 1.703 Subtotal: Installation - / 5.681 - / 0.445 - / 1.703 / 0.000 - / - - / - - - / - - - / - - Total Total Cost (Procurement + Support + Installation) LI 2210 - Submarine Acoustic Warfare System Navy 89.306 3.397 5.734 6.012 0.000 UNCLASSIFIED Page 22 of 32 6.012 6.297 5.398 P-1 Line #42 5.126 Continuing Volume 2 - 118 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Manufacturer Information Manufacturer Name: CSA MK 2 to MK4 RAYTHEON Manufacturer Location: Keyport, WA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: CSA MK3 Technology Insertion (TI-20) Raytheon Manufacturer Location: Poulsbo, WA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: CSA MK5 Technology Insertion (TI-22) Raytheon / DRS Manufacturer Location: Poulsbo, WA / Johnstown, PA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: CSA MK4/5 Technology Insertion (TI-24) DRS Manufacturer Location: Johnstown, PA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: CSA MK4/5 Technology Insertion (TI-26) DRS Manufacturer Location: Johnstown, PA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 Contract Dates Jul 2027 Delivery Dates Jan 2029 LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 23 of 32 FY 2029 P-1 Line #42 Volume 2 - 119 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Installation Information Method of Implementation: AIT:: Installation Name: WM019 CSAMK2 MOD2 CONVERSION to CSA MK4 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 9 / 2.468 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 2.468 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 9 / 2.468 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 2.468 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Out 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Method of Implementation: AIT:: Installation Name: WM019 CSA MK3 Kits and Systems Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 0.445 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.575 9 / 1.020 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 24 of 32 P-1 Line #42 Volume 2 - 120 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Installation Information Method of Implementation: AIT:: Installation Name: WM019 CSA MK3 Kits and Systems Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - 5 / 0.575 9 / 1.020 Total 4 / 0.445 / - / - / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5 9 Out 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5 9 Method of Implementation: AIT:: Installation Name: WM019 CSA Technology Insertion (TI-20) Upgrade Kits NonOrganic Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 12 / 1.980 13 / 2.155 Prior Years 1 / 0.175 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.175 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 12 / 1.980 13 / 2.155 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 12 - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 13 Out 12 - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 - 1 LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 25 of 32 P-1 Line #42 Volume 2 - 121 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Installation Information Method of Implementation: AIT:: Installation Name: WM019 CSA Technology Insertion (TI-22) Upgrade Kits NonOrganic Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 0.438 1 / 0.270 1 / 0.275 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 0.983 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 0.438 1 / 0.275 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 1 / 0.270 4 / 0.983 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - 1 - - - 1 - - - - - - - - - - - - - - - - - - - - - - 4 Out 2 - - - - - - - - - - - - - - - - - - - - - - - - - 4 - 1 - 1 Method of Implementation: AIT:: Installation Name: WM019 CSA Technology Insertion (TI-24) Upgrade Kits NonOrganic Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.350 - / - 4 / 1.428 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 1.778 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 26 of 32 P-1 Line #42 Volume 2 - 122 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Installation Information Method of Implementation: AIT:: Installation Name: WM019 CSA Technology Insertion (TI-24) Upgrade Kits NonOrganic Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - 0 / 0.000 5 / 1.778 Total 1 / 0.350 - / - 4 / 1.428 / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - 2 2 - - - - - - - - - - - - - - - - - - - - - - - 5 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 5 - 2 2 Method of Implementation: [none specified]:: Installation Name: WM019 CSA Technology Insertion (TI-26) Upgrade Kits NonOrganic Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - 1 / 0.454 - / - - / - 0 / 0.000 1 / 0.454 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 1 / 0.454 - / - - / - 0 / 0.000 Installation Cost 1 / 0.454 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 27 of 32 - - 1 P-1 Line #42 Volume 2 - 123 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CSA WM019 MDAP/MAIS Code: Modification Item 1 of 1: CSA WM019 Installation Information Method of Implementation (Organic): WM019 CSA MK3 Engineering Changes (LAN, SWFTS, TDA) Installation Quantity: 0 Method of Implementation (Organic): WM019 ECPs CSA MK2 MOD 2 Conversion to MK 4 - Not Installed Installation Quantity: 0 Method of Implementation (Organic): WM019 CSA MK2 MOD 0 OBSOLESCENCE - Not Installed Installation Quantity: 42 Method of Implementation (Organic): WM019 CSA Engineering Changes - Organic Installation Quantity: 0 Footnotes: (13) (14) (15) (16) Funding from FY 2026 to FY 2027 increased by $1.467M to return organic labor to baseline after a temporary reduction in FY 2026. While CSA shipset procurement incorporates an 18-month lead time, the software kits require 6 months. Both shipsets and kits are accounted for in the same procurement timeline. While CSA shipset procurement incorporates an 18-month lead time, the software kits require 6 months. Both shipsets and kits are accounted for in the same procurement timeline. Funding from FY 2026 to FY 2027 increased by $0.640M due to the procurement of one (1) CSA Technology Insertion (TI-26) upgrade. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 28 of 32 P-1 Line #42 Volume 2 - 124 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / CRAW WM025 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 9.719 7.896 10.296 6.296 0.000 6.296 6.754 10.991 13.995 - - - - - - - - - 9.719 7.896 10.296 6.296 0.000 6.296 6.754 10.991 13.995 - - - - - - - - - 9.719 7.896 10.296 6.296 0.000 6.296 6.754 10.991 13.995 To FY 2031 Complete 14.959 Continuing - Continuing - 14.959 Continuing - Total - Continuing - - 14.959 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line item procures the required integration kits and other required submarine support equipment for the CRAW MK 58 torpedo. The MK 58 torpedo provides enhanced ASW and ATT mission capabilities to the submarine Force. The MK 58 torpedo is launched from VACL submarines via the integration kits for the ECL and PCS that are procured from this line item. Note, the MK 58 torpedoes will be procured separately via WPN (LI 3121) beginning in FY 2028. [CRAW Installation Kits] The CRAW Installation Kits integrate into the existing VACL submarine Common Weapons Launcher (CWL) and Payload Control System (PCS) so that the CRAW torpedo can be fired from the ECL. [CRAW Launch Tube Assembly] The LTA is a launcher integration kit that is required to integrate the CRAW MK 58 torpedo into the VACL submarine ECL. Each CRAW torpedo is installed into a Launch Tube Assembly integration kit so that it can be loaded into the ECL. [Revolver Units] Revolver is a launcher integration kit that is required to integrate the MK 58 torpedo into the VACL submarine Torpedo Tubes. The Revolver system is not permanently installed onto the submarine. Instead, it is loaded onto the submarine in the same manner as any payload that is stowed in the torpedo room. [Shipping Containers] Three shipping container variants will support the CRAW program and consist of the CRAW device container, the Warhead container, and the Launch Tube Assembly container. [ECL Modules] These kits provide modified External Countermeasure Launcher (ECL) Modules that fully integrate with CRAW interfaces. [Systems Engineering-Backfit Refresh] This line supports the systems engineering and backfit refresh efforts required to establish an industry manufacturing capability to produce the Launch Tube Assembly and other launcher system sub-systems and components. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 29 of 32 P-1 Line #42 Volume 2 - 125 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CRAW WM025 MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: Integration Kit FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CRAW WM025 B Kits Recurring 1.1.1) CRAW Installation Kits - NonOrganic 1.1.2) CRAW Launch Tube Assembly - Organic 1.1.3) Revolver Units - Organic (18) 3 / 6.161 4 / 3.756 - / - - / - - / - - / - - 10 / 1.235 15 / 0.740 - / - - / - - / - - / - 9 / 2.000 - - / - - - (19) 1.1.4) Shipping Containers - Organic 1.1.5) ECL Modules - Organic 2 / 3.971 23 / 4.748 (17) - (20) Subtotal: Recurring / - 30 / 1.000 / / 9.719 - - / - 15 / 0.500 - - / - 15 / 0.500 / - - / - / - / - Continuing Continuing 31 / 6.548 - Continuing Continuing / - - / - / - 2 / 2.800 3 / 4.500 3 / 5.000 Continuing Continuing 10 / 0.300 - / - 10 / 0.300 10 / 0.300 10 / 0.300 10 / 0.300 15 / 0.500 Continuing Continuing 2 / 1.499 - / - 2 / 1.499 2 / 1.524 2 / 1.589 2 / 1.635 2 / 1.679 - / 13.727 Continuing - / 1.232 - - / 1.232 / - / 7.896 - / 4.996 - / 1.799 - / - - / 1.799 - / 1.824 - / 6.689 - / - - / 4.500 - / 2.997 - / - - / 2.997 - / 4.308 - / 4.302 - / - - / 4.500 - / 2.997 - / 4.308 - / 4.302 - - 31 / 6.360 / 12.795 - - / - 10 / 7.926 Continuing Non-Recurring 1.2.1) Systems Engineering-Backfit Refresh - Organic - (21) Subtotal: Non-Recurring Subtotal: CRAW WM025 Subtotal: Procurement, All Modification Items - / / 0.000 55 / 9.719 28 / 7.896 - / 9.719 - Modification Item 1 of 1: CRAW WM025 - / 0.000 - Subtotal: Installation - / 0.000 34 / 9.496 / 2.997 - / - - 12 / 4.796 - / - 12 / 4.796 - / - - / 4.796 - / 6.132 / 0.000 - / 1.500 - / 0.622 / - - / 1.500 - / 0.622 / 7.896 - / 9.496 - / 4.796 / 0.000 - / 0.800 - / 1.500 / - - / 0.800 - / 1.500 12 / 6.132 23 / 10.991 / 10.991 - - / 1.200 - / 1.200 46 / 13.995 / 13.995 - - / / 0.000 - / 18.539 - / 18.539 51 / 14.959 Continuing Continuing / 14.959 Continuing Continuing / 0.000 - / 0.000 - / 2.922 / - - / 0.000 - / 2.922 14.959 Continuing - Installation - - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2210 - Submarine Acoustic Warfare System Navy 9.719 7.896 10.296 6.296 0.000 UNCLASSIFIED Page 30 of 32 6.296 6.754 10.991 P-1 Line #42 13.995 Continuing Volume 2 - 126 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CRAW WM025 MDAP/MAIS Code: Modification Item 1 of 1: CRAW WM025 Manufacturer Information Manufacturer Name: General Dynamics Mission Systems (GDMS) Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 Contract Dates May 2025 May 2026 Delivery Dates May 2027 May 2028 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CRAW Installation Kits Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - 2 / 0.800 - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.800 FY 2025 - / - - / - - / - 3 / 1.500 0 / 0.000 3 / 1.500 - / - - / - - / - - / - 0 / 0.000 3 / 1.500 FY 2026 - / - - / - - / - - / - - / - - / - 4 / 0.622 - / - - / - - / - 0 / 0.000 4 / 0.622 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 2 / 0.800 4 / 0.622 - / - - / - - / - 0 / 0.000 Installation Cost / - - 3 / 1.500 / - 0 / 0.000 3 / 1.500 9 / 2.922 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 2 - - - 3 - - - 4 - - - - - - - - - - - - - - - 9 Out - - - - - - - - - - - - - - - - - - - 9 - - 2 - - - 3 - - - 4 Method of Implementation (Organic): CRAW Launch Tube Assembly - Not Installed Installation Quantity: 119 Method of Implementation (Organic): Revolver Units - Not Installed Installation Quantity: 0 LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 31 of 32 P-1 Line #42 Volume 2 - 127 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2210 / Submarine Acoustic Warfare System ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CRAW WM025 MDAP/MAIS Code: Modification Item 1 of 1: CRAW WM025 Installation Information Method of Implementation (Organic): Shipping Containers - Not Installed Installation Quantity: 0 Method of Implementation (Organic): ECL Modules - Not Installed Installation Quantity: 10 Footnotes: (17) (18) FY 2026 to FY 2027 decrease of $3.756M for Install Kits due to all Install Kits procured in FY 2026. The CRAW Launch Tube Assembly acts as middleware that enables the CRAW torpedo to be integrated into the submarine External Countermeasure Launcher. Each CRAW torpedo is installed into a LTA and delivered to the submarine as an all-up-round weapon. Thus, the LTA is delivered to the submarine as part of the payload load-out and is not permanently installed into a specific submarine. (19) Revolver units are delivered to the submarine as part of the payload load-out and is not permanently installed into a specific submarine. Revolver acts as middleware that enables smaller diameter payloads to be launched from the submarine torpedo tube. (20) (21) The allocated funding for ECL Models in FY 2027 is required to integrate CRAW Systems Engineering Backfit Refresh efforts starting in FY26 supports contract award for the technical refresh of the LTA to address obsolescence and manufacturing issues of the current design. LI 2210 - Submarine Acoustic Warfare System Navy UNCLASSIFIED Page 32 of 32 P-1 Line #42 Volume 2 - 128 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 248.333 248.333 248.333 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 - - - - - - - - 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 To FY 2031 Complete - Total - 31.929 Continuing - Continuing - 31.929 Continuing - Continuing - - - - - - - - - - 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 31.929 Continuing Continuing 3.097 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.399 - 0.292 - 0.292 0.496 1.002 3.335 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Surface Ship Torpedo Defense (SSTD) program provides a layered torpedo defense to protect surface ships against current and future threats. Sustains the in-service system AN/SLQ-25A/C (NIXIE) countermeasure. Modernizes NIXIE to the AN/SLQ-25E variant with a technical and obsolescence refresh that also provides the baseline. The AN/SLQ-25 (NIXIE) is the Navy's primary SSTD system, providing towed persistent torpedo countermeasure. NIXIE currently protects all classes of surface ships. FY 2027 funding restores the AN/SLQ-25 programs yearly budget to support engineering, procures AN/SLQ-25E Backfit systems for the fleet, and support installs. This also funds obsolescence and technical issues discovered during the AN/SLQ-25E system certification and first article testing as an engineering change. WL106 AN/SLQ-25 ENGINEERING CHANGES (ECs): Funding under this cost code provides support of three major efforts: (1) Engineering Changes for AN/SLQ-25 System that includes investigation and resolution of Trouble Reports (TRs), including those resulting from service-identified issues resulting in operational downtime. (2) Continuation of software modernization and system integration. (3) Continuation of AN/ SLQ-25C/E system support for Obsolescence, Diminishing Manufacturing Sources and Material Shortages (DMSMS) and safety improvements. WL830 PRODUCTION ENGINEERING-IN-HOUSE: Funding under this cost code provides specification preparation and validation, production planning, contract deliverable monitoring, prime contractor monitoring for cost, schedule, and performance and Integrated Logistics Support (ILS) planning, review and evaluation of obsolescence issues, and coordination of government furnished information (GFI) and government furnished equipment (GFE). WL840 QUALITY ASSURANCE: Funding under this cost code provides for quality assurance efforts including conducting quality assurance reviews of the contractor and subcontractors, documentation indicating contractor conformity to product performance requirements, and review of objective quality evidence. WL860 ACCEPTANCE TEST & ENGINEERING: Funding under this cost code provides for production acceptance of contractor hardware. Acceptance testing includes government acceptance testing and Environmental Qualification Testing (EQT) in support of the AN/SLQ-25 modernization with operationally trained subject matter experts and software support engineers. WL900 CONSULTING SERVICES: Funding under this cost code provides for contractor support to the program office for production monitoring, installation planning and coordination support. LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 1 of 9 P-1 Line #43 Volume 2 - 129 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A WL905 PRODUCTION ENGINEERING CONTRACTOR: Funding under this cost code provides for SLQ-25E production engineering tasks performed by the hardware contractor. This includes system procurement, engineering, and technical services. LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 2 of 9 P-1 Line #43 Volume 2 - 130 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SSTD - / 156.934 P-3a 1 / WL106 ENGINEERING CHANGES (Tech Refresh) (SHIPALT) - / 91.399 P-40 Total Gross/Weapon System Cost - / 248.333 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - / 9.647 - / 9.647 - / - - / 14.915 - / 14.915 - / - - / 14.857 - / 14.857 - / - - - / 0.000 - - / 0.000 - / / 14.857 / 14.857 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SSTD P-3a 1 / WL106 ENGINEERING CHANGES (Tech Refresh) (SHIPALT) - - / 22.030 / - - / 26.969 / - - / 31.312 / - - / 31.929 / - Continuing - / - Continuing - / - P-40 Total Gross/Weapon System Cost - / 22.030 - / 26.969 - / 31.312 - / 31.929 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2026 to FY 2027 funding decrease of $0.058M due to Navy priorities still allows for funding to be in support of Torpedo Defense requirements for all classes of surface ships. AN/SLQ-25E competitive production contract award expected in FY 2026 and will support the procurement of Backfit kits. LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 3 of 9 P-1 Line #43 Volume 2 - 131 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SSTD FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) WL101 AN/SLQ-25A UPGRADE KITS 1.1) 25A Modification Kits A 528,387.85 Subtotal: 1) WL101 AN/SLQ-25A UPGRADE KITS - 214 113.075 - - - - - - - - - - - - - - - - 113.075 - - - - - - - - - - - - - - - 3.788 - - - - - - - - - - - - - - - 3.788 - - - - - - - - - - - - - - - 13.447 - - - - - - - - - - - - - - - 2) WL103 AN/SLQ-25X (TWS COMPATIBLE SYSTEM) HARDWARE 2.1) WL103 AN/ SLQ-25X (TWS COMPATIBLE SYSTEM) HARDWARE A 3,788K Subtotal: 2) WL103 AN/SLQ-25X (TWS COMPATIBLE SYSTEM) HARDWARE - 1 - 3) WL104 AN-SLQ-25D EC-2 () 3.1) AN-SLQ-25C EC-2 () A 13,447K Subtotal: 3) WL104 AN-SLQ-25D EC-2 () 1 - - 13.447 - - - - - - - - - - - - - - - - - 1.500 - - - - - - - - - - - - - - - - - 1.500 - - - - - - - - - - - - - - - - - 2.100 - - - - - - - - - - - - - - - - - 0.936 - - - - - - - - - - - - - - - - - 3.036 - - - - - - - - - - - - - - - - - 13.281 - - - - - - - - - - - - - - - - - 13.281 - - - - - - - - - - - - - - - - - 1.264 - - - - - - - - - - - - - - - - - 0.212 - - - - - - - - - - - - - - - 4) WL105 AN-SLQ-25C CVN BATTLE SPARE 4.1) HARDWARE A Subtotal: 4) WL105 AN-SLQ-25C CVN BATTLE SPARE 5) WL106 (Tech Refresh) SHIP 5.1) EC-1 UPDATE SLQ-25 A 5.2) TECH INSERTION EC SLQ-25 A Subtotal: 5) WL106 (Tech Refresh) SHIP 6) WL830 PRODUCTION ENGINEERING 6.1) PRODUCTION ENGINEERING INHOUSE A Subtotal: 6) WL830 PRODUCTION ENGINEERING 7) WL840 QUALITY ASSURANCE 7.1) QUALITY ASSURANCE (INHOUSE) A 7.2) Torpedo Warning System (TWS) Quality Assurance A LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 4 of 9 P-1 Line #43 Volume 2 - 132 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Subtotal: 7) WL840 QUALITY ASSURANCE Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: SSTD FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - 1.476 - - - - - - - - - - - - - - - - - 1.824 - - - - - - - - - - - - - - - - - 0.496 - - - - - - - - - - - - - - - - - 2.320 - - - - - - - - - - - - - - - - - 2.869 - - - - - - - - - - - - - - - - - 2.869 - - - - - - - - - - - - - - - - - 2.142 - - - - - - - - - - - - - - - Subtotal: 10) WL905 PRODUCTION ENGINEERING CONTRACTOR - - 2.142 - - - - - - - - - - - - - - - Total - - 156.934 - - - - - - - - - - - - - - - 8) WL860 ACCEPTANCE TEST AND ENGINEERING 8.1) ACCEPTANCE TESTING & ENGINEERING A 8.2) TWS Acceptance Testing & Engineering A Subtotal: 8) WL860 ACCEPTANCE TEST AND ENGINEERING 9) WL900 SERVICES 9.1) CONSULTING SERVICES A Subtotal: 9) WL900 SERVICES 10) WL905 PRODUCTION ENGINEERING CONTRACTOR 10.1) PRODUCTION ENGINEERING CONTRACTOR A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 5 of 9 P-1 Line #43 Volume 2 - 133 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / WL106 ENGINEERING CHANGES (Tech Refresh) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 91.399 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 - - - - - - - - - 91.399 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 - - - - - - - - - 91.399 9.647 14.915 14.857 0.000 14.857 22.030 26.969 31.312 To FY 2031 Complete 31.929 Continuing - Continuing - 31.929 Continuing - Total - Continuing - - 31.929 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: SSTD provides a layered torpedo defense to protect surface ships against current and future threats, sustains deployed systems including the towed AN/SLQ-25A/C (NIXIE) countermeasure, and modernizes NIXIE to the AN/SLQ-25E variant with a technical and obsolescence refresh that also provides the baseline. LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 6 of 9 P-1 Line #43 Volume 2 - 134 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/SLQ-25 Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 1 / WL106 ENGINEERING CHANGES (Tech Refresh) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: WL106 ENGINEERING CHANGES (Tech Refresh) B Kits Recurring 1.1.1) WL106 TECH INSERTION EC SLQ-25 - Organic - / 6.069 - / 1.853 - / 0.278 - / 0.278 - / - - / 0.278 - / 0.299 - / 0.299 - / 0.299 - / 0.299 1.1.2) WL106 ECPs - Organic - Organic - / 4.146 - / 0.534 - / 1.248 - / 1.236 - / - - / 1.236 - / 1.955 - / 2.384 - / 2.431 - / 2.435 1.1.3) WL106 EC-1 UPDATE SLQ-25 - Organic NonOrganic - / 4.354 - / 0.235 - / 0.048 - / 0.049 - / - - / 0.049 - / 0.050 - / 0.051 - / 0.052 - / 0.053 1.1.4) WL106 SLQ-25E Backfit Kits - NonOrganic / - - / - 2 / 5.927 2 / 6.022 4 / 9.738 / - 7 / 15.449 - / - / 18.236 Continuing - / 9.674 - / 4.892 2 / 6.022 - / - - / 2.622 - / 7.501 - / 7.585 - / - - / 7.585 1.2.1) WL106 AN/SLQ-25 Tech Insertion - Non Organic - / 27.918 - / 1.199 - / 0.750 - / 0.765 - / - - / 0.765 - / 0.780 - / 1.883 - / 0.813 - / 0.900 1.2.2) WL106 AN/SLQ-25 Tech Insertion - Organic - / 10.788 - / 1.207 - / 0.300 - / 0.449 - / - - / 0.449 - / 0.458 - / 1.767 - / 1.963 - / 2.200 - / 38.706 - / 2.406 - / 1.050 - / 1.214 - / - - / 1.214 - / 1.238 - / 3.650 - / 2.776 - / 3.100 - - / 53.275 - / 5.028 2 / 8.799 - / - 7 / 21.336 Continuing Continuing - / 53.275 - / 5.028 - / 8.551 - / 8.799 - / - - / 8.799 / 21.336 Continuing Continuing / 12.042 / 12.661 - 7 / 16.025 - - Continuing / 14.569 - 4 / 9.927 / - - Subtotal: Recurring - - Continuing / 18.807 - - 26 / 63.088 Continuing Non-Recurring Subtotal: Non-Recurring Subtotal: WL106 ENGINEERING CHANGES (Tech Refresh) Subtotal: Procurement, All Modification Items 2 / 8.551 2 / 8.799 4 / 13.280 / 13.280 - 4 / 16.311 / 16.311 - 7 / 21.583 / 21.583 - - - / - - / 35.008 / - - / 19.132 / 0.000 - / 54.140 Support (All Modification Items) 2.1) WL830 AN/SLQ-25 Production Engineering In House - / 3.780 - / 0.400 - / 0.560 - / 0.572 - / - - / 0.572 - / 0.583 - / 0.594 - / 0.607 - / 0.750 Continuing Continuing 2.2) WL840 AN/SLQ-25 Quality Assurance - / 2.762 - / 0.320 - / 0.330 - / 0.330 - / - - / 0.330 - / 0.340 - / 0.350 - / 0.350 - / 0.350 Continuing Continuing 2.3) WL860 AN/SLQ-25 Acceptance Test and Engineering - / 4.514 - / 0.490 - / 0.430 - / 0.540 - / - - / 0.540 - / 1.540 - / 2.750 - / 0.785 - / 0.900 Continuing Continuing 2.4) WL900 AN/SLQ-25 Consulting Services - / 5.126 - / 0.409 - / 0.610 - / 0.522 - / - - / 0.522 - / 0.463 - / 0.474 - / 0.485 - / 0.610 Continuing Continuing - / 21.942 - / 3.000 - / 2.334 - / 2.364 - / - - / 2.364 - / 2.355 - / 2.410 - / 2.382 - / 2.800 Continuing Continuing - / 38.124 - / 4.619 - / 4.264 - / 4.328 - / - - / 4.328 - / 5.281 - / 6.578 - / 4.609 - / 5.410 Continuing Continuing - / 0.000 - / 2.100 - / 1.730 / 0.000 - / 1.730 - / 3.469 - / 4.080 - / 5.120 - / 5.183 - / 0.000 - / 21.682 / - - / 2.100 - / 1.730 / - - / 1.730 - / 3.469 - / 4.080 - / 5.120 - / 5.183 - / 0.000 - / 21.682 2.5) WL905 AN/SLQ-25 Production Engineering Contractor Subtotal: Support Installation Modification Item 1 of 1: WL106 ENGINEERING CHANGES (Tech Refresh) - / 0.000 Subtotal: Installation - / 0.000 - - Total LI 2213 - Surface Ship Torpedo Def (SSTD) Navy UNCLASSIFIED Page 7 of 9 P-1 Line #43 Volume 2 - 135 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/SLQ-25 Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 1 / WL106 ENGINEERING CHANGES (Tech Refresh) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost (Procurement + Support + Installation) LI 2213 - Surface Ship Torpedo Def (SSTD) Navy 91.399 9.647 14.915 14.857 0.000 UNCLASSIFIED Page 8 of 9 14.857 22.030 26.969 P-1 Line #43 31.312 31.929 Continuing Continuing Volume 2 - 136 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2213 / Surface Ship Torpedo Def (SSTD) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / WL106 ENGINEERING CHANGES (Tech Refresh) MDAP/MAIS Code: Modification Item 1 of 1: WL106 ENGINEERING CHANGES (Tech Refresh) Manufacturer Information Manufacturer Name: ULTRA Maritime Manufacturer Location: Braintree, Ma Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Dec 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: WL106 SLQ-25E Backfit Kits Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 2 / 2.100 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.100 FY 2027 - / - - / - - / - 2 / 1.730 0 / 0.000 2 / 1.730 - / - - / - - / - - / - 0 / 0.000 2 / 1.730 FY 2028 - / - - / - - / - - / - - / - - / - 4 / 3.469 - / - - / - - / - 0 / 0.000 4 / 3.469 FY 2029 - / - - / - - / - - / - - / - - / - - / - 4 / 4.080 - / - - / - 0 / 0.000 4 / 4.080 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.120 - / - 0 / 0.000 7 / 5.120 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.183 0 / 0.000 7 / 5.183 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total - / - - / - 2 / 2.100 Installation Cost 2 / 1.730 0 / 0.000 2 / 1.730 4 / 3.469 4 / 4.080 7 / 5.120 / - 7 / 5.183 / - - 0 / 0.000 / - 26 / 21.682 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 2 - - - 2 - - - 4 - - - 4 - - - 7 - - - 7 - 26 Out - - - - - - - - - - - - - - - - - - - 14 26 - - 2 - Method of Implementation (Organic): WL106 ECPs - Organic - Not Installed LI 2213 - Surface Ship Torpedo Def (SSTD) Navy 2 - 2 - 6 - Installation Quantity: 0 UNCLASSIFIED Page 9 of 9 P-1 Line #43 Volume 2 - 137 === page 218 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 138 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2225 / Fixed Surveillance System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 4,047.384 4,047.384 4,047.384 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 405.854 405.854 405.854 352.312 352.312 352.312 490.548 490.548 490.548 0.000 0.000 0.000 490.548 490.548 490.548 507.509 507.509 507.509 458.055 458.055 458.055 To FY 2031 Complete 501.627 501.627 501.627 511.685 Continuing 511.685 - Total - Continuing Continuing Continuing - - 511.685 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. [P40A / Classified (2225)]: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. [P40A / Classified (222506)]: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 2225 - Fixed Surveillance System Navy UNCLASSIFIED Page 1 of 3 P-1 Line #44 Volume 2 - 139 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2225 / Fixed Surveillance System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Fixed Surveillance System - / 4,047.384 - / 405.854 - / 352.312 - / 490.548 P-40 Total Gross/Weapon System Cost - / 4,047.384 - / 405.854 - / 352.312 - / 490.548 - / - - / 490.548 / 0.000 - / 490.548 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. The FY 2026 request for Fixed Surveillance System includes $352,312 thousands of discretionary and $143,000 thousands of mandatory (reconciliation) for a total of $495,312 thousand. OOC: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 2225 - Fixed Surveillance System Navy UNCLASSIFIED Page 2 of 3 P-1 Line #44 Volume 2 - 140 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2225 / Fixed Surveillance System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Fixed Surveillance System FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Classified 1.1) Classified (2225) A 1.2) Classified (222506) A - - 3,911.659 - - 398.131 - - 344.530 - - 483.155 - - - - - 483.155 - - 135.725 - - 7.723 - - 7.782 - - 7.393 - - - - - 7.393 Subtotal: 1) Classified - - 4,047.384 - - 405.854 - - 352.312 - - 490.548 - - - - - 490.548 Total - - 4,047.384 - - 405.854 - - 352.312 - - 490.548 - - - - - 490.548 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 2225 - Fixed Surveillance System Navy UNCLASSIFIED Page 3 of 3 P-1 Line #44 Volume 2 - 141 === page 222 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 142 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2237 / SURTASS Program Elements for Code B Items: N/A Other Related Program Elements: 0204311N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 425.182 425.182 425.182 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 45.975 31.169 72.190 0.000 72.190 24.847 21.098 20.529 - - - - - - - - 45.975 31.169 72.190 0.000 72.190 24.847 21.098 20.529 To FY 2031 Complete - Total - 20.930 Continuing - Continuing - 20.930 Continuing - Continuing - - - - - - - - - - 45.975 31.169 72.190 0.000 72.190 24.847 21.098 20.529 20.930 Continuing Continuing 0.914 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.867 0.523 1.788 - 1.788 2.663 2.828 0.981 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: PROGRAM COVERAGE: Surveillance Towed Array Sensor System (SURTASS) is the mobile, tactical, and strategic arm of the Navy's undersea surveillance capability that provides deep ocean and littoral acoustic detection and cueing for tactical weapon platforms against diesel and nuclear submarines as well as surface vessels in any given Area of Operations worldwide. Dedicated Anti-Submarine Warfare (ASW) T-AGOS ships tow long acoustic arrays that collect acoustic data and relay that data to shore facilities via satellites for processing and fusion of the resulting contact data with other sensors. Currently, there are five Small Waterplane Area Twin Hull (SWATH) Passive (P)/Active (A) T-AGOS ships operating in the Pacific area. Ship configurations are: T-AGOS 22 USNS LOYAL (1), a SWATH-P platform which supports passive operations using the TB-29A Twinline (TL-29A) array, providing improved detection and classification capability. This ship class uses the Integrated Common Processor (ICP) signal processing and display system common with the SSN Acoustic Rapid Commercial Off the Shelf (COTS) Insertion (ARCI) Sonar Processing System. Three (3) T-AGOS SWATH-P platforms, T-AGOS 19 USNS VICTORIOUS, T-AGOS 20 USNS ABLE, and T-AGOS 21 USNS EFFECTIVE, supporting passive/active operations, configured with the ICP processing and display system, the TL-29A array, and the Compact Low Frequency Active (CLFA) transmit capability. One (1) Low Frequency Active (LFA) equipped ship, T-AGOS 23 USNS IMPECCABLE, a SWATH-A platform configured with the ICP processing and display system, the TL-29A array, and the Low Frequency Active (LFA) transmit capability. The active capability provides greatly improved detection against diesel submarines as well as the quiet nuclear submarine threat. In addition to the five platforms described above, two (2) shore sites are configured with the ICP processing and display suites to receive the T-AGOS acoustic data via Super High Frequency (SHF) satellite communication links. One of the two shore sites is equipped with three (3) SURTASS Team Trainers (STTs) to support Home Port Training Periods. A cost sharing agreement with Japan also provides two (2) shore sites and four (4) Japanese SWATH ships with similar capability to the T-AGOS SWATH-P ships for the Western Pacific region. Funding supports the U.S. cost share for the procurement of Towed Arrays for the new J-AOS-4 ship. The Expeditionary Surveillance Towed Array Sensor System (SURTASS-E) provides a SURTASS passive capability packaged in ISO-Vans (ISO-International Organization for Standardization) for mobilization on Vessels of Opportunity (VOOs). It was developed as a Rapid Prototyping, Experimentation, and Demonstration (RPED) project, tasked to re-package, test, and demonstrate an expeditionary variant of the passive component of the SURTASS acoustic surveillance system that can be used as a surrogate for some of the SURTASS capabilities provided by traditional T-AGOS class vessels. LI 2237 - SURTASS Navy UNCLASSIFIED Page 1 of 23 P-1 Line #45 Volume 2 - 143 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2237 / SURTASS Program Elements for Code B Items: N/A Other Related Program Elements: 0204311N Line Item MDAP/MAIS Code: N/A [P40A / SURTASS-E Array]: The Expeditionary Surveillance Towed Array Sensor System (SURTASS-E) provides a SURTASS passive capability packaged in ISO-Vans (ISO-International Organization for Standardization) for mobilization on Vessels of Opportunity (VOOs). It was developed as a Rapid Prototyping, Experimentation, and Demonstration (RPED) project, tasked to re-package, test, and demonstrate an expeditionary variant of the passive component of the SURTASS acoustic surveillance system that can be used as a surrogate for some of the SURTASS capabilities provided by traditional T-AGOS class vessels. [P40A / SURTASS-E Kits]: The Expeditionary Surveillance Towed Array Sensor System (SURTASS-E) provides a SURTASS passive capability packaged in ISO-Vans (ISO-International Organization for Standardization) for mobilization on Vessels of Opportunity (VOOs). It was developed as a Rapid Prototyping, Experimentation, and Demonstration (RPED) project, tasked to re-package, test, and demonstrate an expeditionary variant of the passive component of the SURTASS acoustic surveillance system that can be used as a surrogate for some of the SURTASS capabilities provided by traditional T-AGOS class vessels. [P40A / Deep Water Active (DWA)]: The Deployable Surveillance Systems (DSS), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Undersea Warfare (TUSW) commanders worldwide. DSS will operate as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements documents and follow-on Course of Action Analysis (COAA) and as dictated by TUSW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP) and Deep Water Active (DWA). Informed by TUSW Offset operations and the tailored requirements process, the DSS Middle Tier Acquisition (MTA) Rapid Fielding Program focused initially on the DWP increment and associated spiral development updates. Spiral developments to meet the evolving submarine threat will leverage on-going Navy, Defense Advanced Research Projects Agency (DARPA), and small business research efforts including processing and sensor technology. FY27 includes funds for DWA that will provide a rapidly deployable sustained surveillance capability in response to emergent Fleet Undersea Warfare (USW) coverage gaps to include mitigating array outages or platform shortages. LI 2237 - SURTASS Navy UNCLASSIFIED Page 2 of 23 P-1 Line #45 Volume 2 - 144 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 3: ASW Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2237 / SURTASS Program Elements for Code B Items: N/A Other Related Program Elements: 0204311N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Surveillance Towed Array Sensor System, Expeditionary (SURTASSE) - / 100.483 / - - / 45.100 / - - / 45.100 P-3a 1 / VG006 - Integrated Common Processor (N/A) - / 127.946 - / 17.262 - / 12.516 - / 11.384 - / 0.000 - / 11.384 P-3a 2 / VG006 - TL-29A U.S. Twinline Arrays (N/A) - / 72.884 - / 2.085 - / 2.092 - / 1.904 - / 0.000 - / 1.904 P-3a 3 / VG006 - SURTASS Team Trainer (N/A) - / 31.311 - / 2.000 - / 13.892 - / 8.583 - / 0.000 - / 8.583 P-3a 5 / VG007 - Field Changes/Modifications (N/A) - / 40.097 - / 2.665 - / 2.669 - / 5.219 - / 0.000 - / 5.219 P-3a 6 / VG006 J-AOS (N/A) - / 52.461 - / 21.963 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 425.182 - / 45.975 - / 31.169 - / 72.190 - / 0.000 - / 72.190 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Surveillance Towed Array Sensor System, Expeditionary (SURTASSE) P-3a 1 / VG006 - Integrated Common Processor (N/A) - / 11.484 - / 10.172 - / 10.254 - / 10.518 Continuing Continuing P-3a 2 / VG006 - TL-29A U.S. Twinline Arrays (N/A) - / 2.181 - / 2.224 - / 2.268 - / 2.316 Continuing Continuing P-3a 3 / VG006 - SURTASS Team Trainer (N/A) - / 5.332 - / 2.802 - / 2.057 - / 2.096 Continuing Continuing P-3a 5 / VG007 - Field Changes/Modifications (N/A) - / 5.850 - / 5.900 - / 5.950 - / 6.000 Continuing Continuing P-3a 6 / VG006 J-AOS (N/A) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 24.847 - / 21.098 - / 20.529 - / 20.930 Continuing - / - - / - - / - - / - - / - / 0.000 - - / - / 74.424 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding amount of $72.190M consists of $11.384M in funding for Integrated Common Processor (ICP) units, $1.903M for TL-29A towed array refurbishments, $8.583M for procurement and installation of Surveillance Towed Array Sensor System (SURTASS) Team Trainer (STT) systems, $5.219M for field changes and modifications for transition to upgraded command and control (C2) capabilities, and $13.200M was provided in FY27 for tech refresh of Expeditionary Surveillance Towed Array Sensor System (SURTASS-E) Kit #1. Additionally, $31.900M was provided for the fabrication of Deployable Surveillance Systems (DSS) Deep Water Active (DWA) Post and DWA Post refurbishments in support of providing a Barrier for Middle Tier Acquisition (MTA) Rapid Fielding. LI 2237 - SURTASS Navy UNCLASSIFIED Page 3 of 23 P-1 Line #45 Volume 2 - 145 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Surveillance Towed Array Sensor System, Expeditionary (SURTASS-E) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) SURTASS 1.1) SURTASS-E Array (1) 1.2) SURTASS-E Kits (2) A A Subtotal: 1) SURTASS 10,000K 1 10.000 - - - - - - - 45,242K 2 90.483 - - - - - - 6,600K 100.483 - - - - - - - 2 - - - - - - 13.200 - - - 6,600K 13.200 - - - - 31.900 - - - - 2 - 13.200 - - 13.200 - - - - - - - - - Subtotal: 2) Deployable Surveillance System (DSS) - - 0.000 - - - - - - - - 31.900 - - - - - 31.900 Total - - 100.483 - - - - - - - - 45.100 - - - - - 45.100 2) Deployable Surveillance System (DSS) 2.1) Deep Water Active (DWA) (3) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 10,633K 3 10,633K 3 31.900 Footnotes: (1) $10M was provided in FY19 for procurement of a production TL-29A Twin Line Towed Array plus supporting towed array assemblies and components required for extended testing and development (SEK1). Additional funds were provided in FY21 and FY22 for procurement of one (1) full production SURTASS-E system kit per year (SEK2 & SEK3). (2) (3) $13.200M is provided in FY27 for tech refresh of Expeditionary Surveillance Towed Array Sensor System (SURTASS-E) Kit #1. 31.900M was provided in FY27 for the fabrication of (1) Deployable Surveillance Systems (DSS) Deep Water Active (DWA) Post (3 nodes) and 2 DWA Post (6 Nodes) Refurbishments in support providing a Barrier for Middle Tier Acquisition (MTA) Rapid Fielding. LI 2237 - SURTASS Navy UNCLASSIFIED Page 4 of 23 P-1 Line #45 Volume 2 - 146 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / VG006 - Integrated Common Processor MDAP/MAIS Code: Prior Years 127.946 127.946 127.946 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 17.262 12.516 11.384 0.000 11.384 11.484 10.172 10.254 - - - - - - - - 17.262 12.516 11.384 0.000 11.384 11.484 10.172 10.254 - - - - - - - - 17.262 12.516 11.384 0.000 11.384 11.484 10.172 10.254 To FY 2031 Complete 10.518 Continuing - Continuing - 10.518 Continuing - Total - Continuing - - 10.518 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Integrated Common Processor (ICP) system hardware and software configuration varies from ship to ship depending upon the type of arrays installed on each platform (passive only, passive and Low Frequency Active (LFA), or passive and Compact Low Frequency Active (CLFA)). Additionally, tech refresh efforts and individual unit procurements and their related costs can be more significant in some years based on a wide range of factors including: the number of end of life components that require refresh; whether the build is addressing passive only functionality, LFA or CLFA functionality, or a combination of the three; the extent of cyber security and program protection improvements required; the scope of testing required for a particular ICP system undergoing refresh; and the need to update Configuration Control Models (CCMs) or Engineering Measurements Program (EMP) systems for each major hardware refresh. LI 2237 - SURTASS Navy UNCLASSIFIED Page 5 of 23 P-1 Line #45 Volume 2 - 147 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / VG006 - Integrated Common Processor MDAP/MAIS Code: Models of Systems Affected: Integrated Common Processor Prior Years Related RDT&E PEs: 0204311N Modification Type: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: VG006 - Integrated Common Processor B Kits Recurring 1.1.1) Integrated Common Processor - NonOrganic (4) Subtotal: Recurring Subtotal: VG006 - Integrated Common Processor Subtotal: Procurement, All Modification Items 85 / 97.513 - / 97.513 85 / 97.513 - / 97.513 Modification Item 1 of 1: VG006 - Integrated Common Processor - / 30.433 Subtotal: Installation - / 30.433 10 / 13.612 / 13.612 - 7 / 9.100 - 10 / 13.612 / 9.100 - 7 / 9.100 7 / 8.276 - / - Continuing Continuing Continuing - / 7.953 Continuing Continuing / 2.428 - / 2.565 - / 6.022 - / 57.320 / 2.428 - / 2.565 - / 6.022 - / 57.320 10.518 Continuing / - - / 8.276 - / 8.156 - / 7.802 - / 7.826 / 0.000 - / 3.108 - / 3.328 - / 2.370 - / - - / 3.108 - / 3.328 - / 2.370 - / 9.100 - / 8.276 - / 3.650 - / 3.416 - / 3.108 - / 3.650 - / 3.416 - / 3.108 - 6 / 7.802 Continuing Continuing - - - Continuing / 7.953 / - 6 / 8.156 6 / 7.953 6 / 7.953 / - - - / 7.802 6 / 7.826 - 7 / 8.276 / 8.156 6 / 7.802 / 8.276 - / 8.276 6 / 8.156 7 / 8.276 / 13.612 - 7 / 8.276 / 7.826 - 6 / 7.826 Installation - Total Total Cost (Procurement + Support + Installation) LI 2237 - SURTASS Navy 127.946 17.262 12.516 11.384 0.000 UNCLASSIFIED Page 6 of 23 11.384 11.484 10.172 P-1 Line #45 10.254 Continuing Volume 2 - 148 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / VG006 - Integrated Common Processor MDAP/MAIS Code: Modification Item 1 of 1: VG006 - Integrated Common Processor Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: Integrated Common Processor Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 75 / 30.433 10 / 3.650 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 85 / 34.083 10 / 3.416 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 3.416 FY 2025 - / - - / - FY 2026 - / - - / - - / - 7 / 3.108 0 / 0.000 7 / 3.108 - / - - / - - / - - / - 0 / 0.000 7 / 3.108 FY 2027 - / - - / - - / - - / - - / - - / - 7 / 3.328 - / - - / - - / - 0 / 0.000 7 / 3.328 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 2.370 - / - - / - 0 / 0.000 6 / 2.370 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 2.428 - / - 0 / 0.000 6 / 2.428 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 2.565 0 / 0.000 6 / 2.565 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 2.990 6 / 2.990 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 3.032 6 / 3.032 6 / 2.565 12 / 6.022 139 / 57.320 Total LI 2237 - SURTASS Navy 75 / 30.433 10 / 3.650 10 / 3.416 7 / 3.108 0 / 0.000 UNCLASSIFIED Page 7 of 23 7 / 3.108 7 / 3.328 6 / 2.370 P-1 Line #45 6 / 2.428 Volume 2 - 149 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / VG006 - Integrated Common Processor MDAP/MAIS Code: Modification Item 1 of 1: VG006 - Integrated Common Processor Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: Integrated Common Processor Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 75 - 4 3 3 - 4 3 3 - 2 2 3 - 2 3 2 - 2 2 2 - 2 2 2 - 2 2 2 12 139 Out 75 - 4 3 3 - 4 3 3 - 2 2 3 - 2 3 2 - 2 2 2 - 2 2 2 - 2 2 2 12 139 Footnotes: (4) The Integrated Common Processor (ICP) system hardware and software configuration varies from ship to ship depending upon the type of arrays installed on each platform (passive only, passive and Low Frequency Active (LFA), or passive and Compact Low Frequency Active (CLFA)). Additionally, tech refresh efforts and individual unit procurements and their related costs can be more significant in some years based on a wide range of factors including: the number of end of life components that require refresh; whether the build is addressing passive only functionality, LFA or CLFA functionality, or a combination of the three; the extent of cyber security and program protection improvements required; the scope of testing required for a particular ICP system undergoing refresh; and the need to update Configuration Control Models (CCMs) or Engineering Measurements Program (EMP) systems for each major hardware refresh. Lastly, total quantities can vary year to year dependent on individual Ship, Shore, and New construction annual requirements including programming of SCN. LI 2237 - SURTASS Navy UNCLASSIFIED Page 8 of 23 P-1 Line #45 Volume 2 - 150 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / VG006 - TL-29A U.S. Twinline Arrays MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 72.884 2.085 2.092 1.904 0.000 1.904 2.181 2.224 2.268 - - - - - - - - - 72.884 2.085 2.092 1.904 0.000 1.904 2.181 2.224 2.268 - - - - - - - - - 72.884 2.085 2.092 1.904 0.000 1.904 2.181 2.224 2.268 To FY 2031 Complete 2.316 Continuing - Continuing - 2.316 Continuing - Total - Continuing - - 2.316 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The TL-29A Twinline is a shallow water variant of the common array produced by Naval Sea Systems Command (NAVSEA). The array consists of two (2) shorter array lengths and array support equipment, and is designed for increased surveillance capability in high clutter environments and littoral areas. Funding is provided to refurbish existing TL-29A array legs and associated support equipment. Support equipment includes ancillary test sets, array headline and roll control systems, tow cables, and array leader cables. LI 2237 - SURTASS Navy UNCLASSIFIED Page 9 of 23 P-1 Line #45 Volume 2 - 151 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / VG006 - TL-29A U.S. Twinline Arrays MDAP/MAIS Code: Related RDT&E PEs: 0204311N Models of Systems Affected: TL-29A Twinline Arrays Modification Type: N/A Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: VG006 - TL-29A U.S. Twinline Arrays B Kits Recurring 1.1.1) U.S. Twinline Arrays - Organic (5) Subtotal: Recurring Subtotal: VG006 - TL-29A U.S. Twinline Arrays Subtotal: Procurement, All Modification Items 18 / 72.884 - / 72.884 1 / 2.085 - / 72.884 / 2.085 - 18 / 72.884 1 / 2.092 / 2.085 - / 2.092 - 1 / 2.085 / 2.092 - / - / 1.904 - / - 1 / 1.904 - / - / 1.904 - / - / - - / - - 1 / 2.092 - 1 / 1.904 - 1 / 1.904 / 1.904 - 1 / 2.181 / 1.904 - / 2.181 - 1 / 1.904 1 / 2.224 / 2.181 - / 2.224 - 1 / 2.181 1 / 2.268 / 2.224 - / 2.268 - 1 / 2.224 / 2.268 Continuing Continuing / 2.316 Continuing Continuing 1 / 2.316 Continuing Continuing / 2.316 Continuing Continuing - 1 / 2.268 - 1 / 2.316 - Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - 2.316 Continuing - / - Total Total Cost (Procurement + Support + Installation) LI 2237 - SURTASS Navy 72.884 2.085 2.092 1.904 0.000 UNCLASSIFIED Page 10 of 23 1.904 2.181 2.224 P-1 Line #45 2.268 Continuing Volume 2 - 152 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / VG006 - TL-29A U.S. Twinline Arrays MDAP/MAIS Code: Modification Item 1 of 1: VG006 - TL-29A U.S. Twinline Arrays Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: SYRACUSE, NY Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 19 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Footnotes: (5) The TL-29A Twinline is a shallow water variant of the common array produced by Naval Sea Systems Command (NAVSEA). The array consists of two shorter array lengths and array support equipment, and is designed for increased surveillance capability in high clutter environments and littoral areas. Support equipment procurement is for ancillary test sets, array headline and roll control systems, tow cable, and leader cables. Funds refurbishment of one (1) array leg per year and associated support equipment. Installation Remarks: Installation funding is not required. Upon completion of each refurbishment, the arrays go into the depot spares pool for installation when needed by Operations and Maintenance, Navy (O&MN)-funded Field Support Technicians onboard T-AGOS vessels as older arrays are removed for rebalancing or shipped back to the Original Equipment Manufacturer (OEM) for refurbishment. LI 2237 - SURTASS Navy UNCLASSIFIED Page 11 of 23 P-1 Line #45 Volume 2 - 153 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / VG006 - SURTASS Team Trainer MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 31.311 2.000 13.892 8.583 0.000 8.583 5.332 2.802 2.057 - - - - - - - - - 31.311 2.000 13.892 8.583 0.000 8.583 5.332 2.802 2.057 - - - - - - - - - 31.311 2.000 13.892 8.583 0.000 8.583 5.332 2.802 2.057 To FY 2031 Complete 2.096 Continuing - Continuing - 2.096 Continuing - Total - Continuing - - 2.096 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Surveillance Towed Array Sensor System (SURTASS) Team Trainer (STT) provides SURTASS crews with high fidelity synthetic and live playback training capabilities to support Home Port Training Periods (HPTP) and Pre-Deployment Certification Periods (PDCP). LI 2237 - SURTASS Navy UNCLASSIFIED Page 12 of 23 P-1 Line #45 Volume 2 - 154 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / VG006 - SURTASS Team Trainer MDAP/MAIS Code: Models of Systems Affected: SURTASS Team Trainer Prior Years Related RDT&E PEs: 0204311N Modification Type: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: VG006 - SURTASS Team Trainer B Kits Recurring 1.1.1) SURTASS Team Trainer - NonOrganic (6) Subtotal: Recurring - / - / 24.335 - / - 6 / 24.335 - / - / 24.335 - / - - Subtotal: VG006 - SURTASS Team Trainer Subtotal: Procurement, All Modification Items 6 / 24.335 - 3 / 13.892 / 13.892 - - 3 / 13.892 - 1 / 3.445 - / - 1 / 3.445 Continuing Continuing Continuing - / 0.599 Continuing Continuing / 1.466 - / 1.497 - / 1.690 - / 21.609 / 1.466 - / 1.497 - / 1.690 - / 21.609 2.096 Continuing - / - - / 3.445 - / 3.949 - / 1.343 - / 0.591 / 0.000 - / 5.138 - / 1.383 - / 1.459 - / - - / 5.138 - / 1.383 - / 1.459 - / 13.892 - / 3.445 / 0.000 - / 5.138 / - - / 5.138 - 1 / 1.343 Continuing Continuing / - - Continuing / 0.599 / - - 1 / 3.949 1 / 0.599 1 / 0.599 - - / 1.343 1 / 0.591 / 3.445 1 / 3.445 / 3.949 1 / 1.343 1 / 3.445 - / 3.445 1 / 3.949 / 0.591 - 1 / 0.591 Installation Modification Item 1 of 1: VG006 - SURTASS Team Trainer - / 6.976 - / 2.000 Subtotal: Installation - / 6.976 - / 2.000 - - Total Total Cost (Procurement + Support + Installation) LI 2237 - SURTASS Navy 31.311 2.000 13.892 8.583 0.000 UNCLASSIFIED Page 13 of 23 8.583 5.332 2.802 P-1 Line #45 2.057 Continuing Volume 2 - 155 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / VG006 - SURTASS Team Trainer MDAP/MAIS Code: Modification Item 1 of 1: VG006 - SURTASS Team Trainer Manufacturer Information Manufacturer Name: NSWC CD Manufacturer Location: BETHESDA, MD Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 14 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 FY 2030 FY 2031 Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 14 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: SURTASS Team Trainer Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 6.976 1 / 2.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 8.976 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 2 / 5.138 0 / 0.000 2 / 5.138 - / - - / - - / - - / - 0 / 0.000 2 / 5.138 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 1.383 - / - - / - - / - 0 / 0.000 1 / 1.383 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 1.459 - / - - / - 0 / 0.000 1 / 1.459 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.466 - / - 0 / 0.000 1 / 1.466 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.497 0 / 0.000 1 / 1.497 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.690 1 / 1.690 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 5 / 6.976 1 / 2.000 - / - 2 / 5.138 Installation Cost 0 / 0.000 2 / 5.138 1 / 1.383 1 / 1.459 1 / 1.466 1 / 1.497 / - - / - - 1 / 1.690 / - / - 13 / 21.609 Installation Schedule FY 2025 PYS Q1 In 5 - Out 5 - FY 2026 FY 2027 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 1 - - - - - - - - - - - - - LI 2237 - SURTASS Navy - 1 FY 2028 Q2 Q3 Q4 Q1 2 - - - - - 2 - FY 2029 Q2 Q3 Q4 Q1 1 - - - - - 1 UNCLASSIFIED Page 14 of 23 - FY 2030 Q2 Q3 Q4 Q1 1 - - - - - 1 - FY 2031 Q2 Q3 Q4 Q1 1 - - - - P-1 Line #45 - 1 - Q2 Q3 Q4 TC Tot 1 - - 1 13 1 13 - - 1 Volume 2 - 156 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Footnotes: (6) Modification Number / Title: 3 / VG006 - SURTASS Team Trainer Funding decrease in FY27 is due to decrease in procurement quantities for SURTASS Team Trainers from 3 to 1. STT procurement schedule returns to one procurement per year (FY27-31). LI 2237 - SURTASS Navy UNCLASSIFIED Page 15 of 23 P-1 Line #45 Volume 2 - 157 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / VG007 - Field Changes/Modifications MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 40.097 2.665 2.669 5.219 0.000 5.219 5.850 5.900 5.950 - - - - - - - - - 40.097 2.665 2.669 5.219 0.000 5.219 5.850 5.900 5.950 - - - - - - - - - 40.097 2.665 2.669 5.219 0.000 5.219 5.850 5.900 5.950 To FY 2031 Complete 6.000 Continuing - Continuing - 6.000 Continuing - Total - Continuing - - 6.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Field Changes/Modifications for correction of deficiencies identified by Fleet use, array support, communications equipment and replacement of aging/unsupportable equipment. Funding facilitates transition to an upgraded command and control system, including installation of the Consolidated Afloat Network Enterprise System (CANES). Other aging End-of-life systems, including Global Command and Control SystemMaritime (GCCS-M), Ultra High Frequency (UHF) Line-of-sight Satellite (LOS/SAT), and ship's gyros will need to be replaced in order to ensure continuity of operations should the primary acoustic path to shore become inoperable. Navy Command, Control, Communications, Computers and Intelligence (C4I) system configurations being procured vary, resulting in the variability in individual unit costs across the fiscal years. LI 2237 - SURTASS Navy UNCLASSIFIED Page 16 of 23 P-1 Line #45 Volume 2 - 158 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Field Changes/ Modifications Related RDT&E PEs: 0204311N Modification Type: N/A Prior Years Financial Plan Modification Number / Title: 5 / VG007 - Field Changes/Modifications FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: VG007 - Field Changes/ Modifications B Kits Recurring 1.1.1) Field Changes/Modifications - NonOrganic Subtotal: Recurring Subtotal: VG007 - Field Changes/Modifications Subtotal: Procurement, All Modification Items 108 / 32.765 / 32.765 - 5 / 2.127 - 108 / 32.765 - / 2.127 5 / 2.117 - 5 / 2.127 / 2.117 - 5 / 2.117 7 / 4.511 - / - / 4.511 - / - 7 / 4.511 - / - - / - - / 4.511 - / 5.046 - / 5.080 - / 5.113 / 0.000 - / 0.708 - / 0.804 - / 0.820 - / - - / 0.708 - / 0.804 - / 0.820 - / 32.765 - / 2.127 - / 2.117 - / 4.511 7 / 4.511 - / 4.511 7 / 5.046 - 7 / 4.511 / 5.046 7 / 5.080 - 7 / 5.046 / 5.080 7 / 5.113 - 7 / 5.080 7 / 5.147 Continuing Continuing / 5.147 Continuing Continuing 7 / 5.147 Continuing Continuing - / 5.147 Continuing Continuing / 0.837 - / 0.853 - / 0.000 - / 12.444 / 0.837 - / 0.853 - / 0.000 - / 12.444 6.000 Continuing / 5.113 - 7 / 5.113 Installation Modification Item 1 of 1: VG007 - Field Changes/ Modifications - / 7.332 - / 0.538 - / 0.552 - / 0.708 Subtotal: Installation - / 7.332 - / 0.538 - / 0.552 - / 0.708 - Total Total Cost (Procurement + Support + Installation) LI 2237 - SURTASS Navy 40.097 2.665 2.669 5.219 0.000 UNCLASSIFIED Page 17 of 23 5.219 5.850 5.900 P-1 Line #45 5.950 Continuing Volume 2 - 159 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / VG007 - Field Changes/Modifications MDAP/MAIS Code: Modification Item 1 of 1: VG007 - Field Changes/Modifications Manufacturer Information Manufacturer Name: NIWC PAC Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Sep 2025 Sep 2026 Sep 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Sep 2025 Sep 2026 Sep 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Manufacturer Name: Lockheed Martin Manufacturer Location: VA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Sep 2025 Sep 2026 Sep 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: Field Changes/Modifications Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 108 / 7.332 FY 2025 - / - 5 / 0.538 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 0.538 FY 2026 - / - - / - 5 / 0.552 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 0.552 FY 2027 - / - - / - - / - 7 / 0.708 0 / 0.000 7 / 0.708 - / - - / - - / - - / - 0 / 0.000 7 / 0.708 FY 2028 - / - - / - - / - - / - - / - - / - 7 / 0.804 - / - - / - - / - 0 / 0.000 7 / 0.804 FY 2029 - / - - / - - / - - / - - / - - / - - / - 7 / 0.820 - / - - / - 0 / 0.000 7 / 0.820 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.837 - / - 0 / 0.000 7 / 0.837 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.853 0 / 0.000 7 / 0.853 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total LI 2237 - SURTASS Navy 108 / 7.332 108 / 7.332 5 / 0.538 5 / 0.552 7 / 0.708 0 / 0.000 UNCLASSIFIED Page 18 of 23 7 / 0.708 7 / 0.804 7 / 0.820 P-1 Line #45 7 / 0.837 / - 7 / 0.853 / - 0 / 0.000 - / - 153 / 12.444 Volume 2 - 160 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / VG007 - Field Changes/Modifications MDAP/MAIS Code: Modification Item 1 of 1: VG007 - Field Changes/Modifications Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: Field Changes/Modifications Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 108 - - - 5 - - - 5 - - - 7 - - - 7 - - - 7 - - - 7 - - - 7 - 153 Out 108 - - - 5 - - - 5 - - - 7 - - - 7 - - - 7 - - - 7 - - - 7 - 153 LI 2237 - SURTASS Navy UNCLASSIFIED Page 19 of 23 P-1 Line #45 Volume 2 - 161 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 P-1 Line Item Number / Title: 2237 / SURTASS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / VG006 J-AOS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 52.461 21.963 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 74.424 Total - - - - - - - - - - - - 52.461 21.963 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 74.424 - - - - - - - - - - - - 52.461 21.963 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 74.424 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: P-3A breaks out specific U.S. requirements of cost sharing for Japanese Auxiliary Oceanographic Surveillance (J-AOS) ships and shore sites. FY25 funding supports the procurement of Towed Arrays for the new J-AOS-4 ship. Prior year funding supports the U.S. cost share for the technology refresh of Integrated Common Processor (ICP) hardware and software aboard three (3) J-AOS ships and at two (2) shore sites. This technology refresh ensures compatibility with the latest ICP hardware. LI 2237 - SURTASS Navy UNCLASSIFIED Page 20 of 23 P-1 Line #45 Volume 2 - 162 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / VG006 J-AOS MDAP/MAIS Code: Models of Systems Affected: J-AOS Related RDT&E PEs: 0204311N Modification Type: N/A Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: VG006 J-AOS B Kits Non-Recurring 1.1.1) J-AOS TL-29A Towed Arrays - Organic 3 / 43.354 (7) 1.1.2) J-AOS ICP Hardware Tech Refresh - NonOrganic Subtotal: Non-Recurring / 52.461 - Subtotal: VG006 J-AOS Subtotal: Procurement, All Modification Items 1 / 21.769 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 21.769 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 21.769 - / - - / - - / - - / - - / - - / - - / - - / - / 21.769 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 0.194 / - - / 0.000 - / 0.194 5 / 9.107 - 8 / 52.461 / 52.461 - - / 0.000 - 4 / 65.123 5 / 9.107 / 74.230 - / - 9 / 74.230 / 74.230 - Installation Modification Item 1 of 1: VG006 J-AOS - / 0.000 - / 0.194 Subtotal: Installation - / 0.000 - / 0.194 - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2237 - SURTASS Navy 52.461 21.963 0.000 0.000 0.000 UNCLASSIFIED Page 21 of 23 0.000 0.000 0.000 P-1 Line #45 0.000 0.000 0.000 74.424 Volume 2 - 163 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / VG006 J-AOS MDAP/MAIS Code: Modification Item 1 of 1: VG006 J-AOS Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: Lockheed Martin Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 36 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2028 FY 2026 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: J-AOS ICP Hardware Tech Refresh Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - 5 / 0.194 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 0.194 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 5 / 0.194 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 LI 2237 - SURTASS Navy UNCLASSIFIED Page 22 of 23 P-1 Line #45 5 / 0.194 Volume 2 - 164 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2237 / SURTASS Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / VG006 J-AOS MDAP/MAIS Code: Modification Item 1 of 1: VG006 J-AOS Installation Information Method of Implementation: [none specified]:: Installation Name: J-AOS ICP Hardware Tech Refresh Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 5 - - - - - - - - - - - - - - - - - - - - - - - - - - 5 Out - - - 5 - - - - - - - - - - - - - - - - - - - - - - - - - - 5 Method of Implementation (Organic): J-AOS TL-29A Towed Arrays Installation Quantity: 4 Footnotes: (7) FY25 procurement quantity one (1) represents single full Towed Array procurement as well as other towed array equipment as part of U.S. Navy cost sharing agreement. LI 2237 - SURTASS Navy UNCLASSIFIED Page 23 of 23 P-1 Line #45 Volume 2 - 165 === page 246 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 166 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 4: Electronic Warfare Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Program Elements for Code B Items: 0204228N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 3,140.459 3,140.459 3,140.459 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 190.011 190.011 190.011 422.704 422.704 422.704 653.483 - 0.000 - 653.483 - 0.000 - 653.483 0.000 653.483 653.483 653.483 559.341 563.308 - - 559.341 563.308 - - 559.341 563.308 569.910 569.910 - To FY 2031 Complete 581.122 8,232.046 581.122 Total - 14,912.384 8,232.046 - 14,912.384 - 569.910 581.122 8,232.046 56.493 Continuing 14,912.384 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 10.200 11.226 - 11.226 39.718 16.502 60.840 Flyaway Unit Cost ($ in Dollars) - 125.386 - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AN/SLQ-32: Provides surface combatants defensive and offensive electronic warfare capabilities that are critical to ship-based layered defense. Defensive systems provide Electronic Support (ES) capability- searching for, identifying, and tracking sources of electromagnetic (EM) energy for the purpose of immediate threat recognition, targeting, planning, and conducting of future operations. ES systems complement other ship-based sensors and contribute to a surface combatant's overall picture of its threat environment. Offensive systems provide Electronic Attack (EA) capability- directing EM energy to defeat enemy fires. This non-kinetic soft-kill capability broadens ship self-defense options, deepens magazines, provides reduced logistics, and lowers "cost-per-shot" compared to kinetic munitions. AN/SLQ-32(V) is the core of surface electronic warfare (EW) capability. Navy has fielded surface electronic warfare systems designated as AN/SLQ-32(V)1-7. AN/SLQ-32(V)1-5 are legacy systems no longer in production. AN/SLQ-32(V)6 is an ES system currently in production. AN/SLQ-32(V)7, which builds on (V)6, is also in production, and it provides offensive EA at the strike group level. Scaled Onboard Electronic Attack (SOEA) is a future capability currently in development that will provide EA self-protection capability to ships unable to support AN/SLQ-32(V)7 due to size, weight, power, and cooling. The Surface Electronic Warfare Improvement Program (SEWIP) provides progressively greater capability through a series of block upgrades to AN/SLQ-32(V) systems: - SEWIP Block 1 provided federated Specific Emitter Identification (SEI), an upgraded console and display, and High-Gain High-Sensitivity (HGHS). (Navy recently divested of these requirements for higher priorities ). - SEWIP Block 2 provides enhanced Electronic Support (ES). Block 2 Lite provides ES to ships unable to support Block 2 due to size, weight, power, and cooling constraints. - SEWIP Block 3 provides Electronic Attack (EA) capability. Signal Processing Upgrade was previously referred to as VPX Tech Refresh. Updating the name to better describe full capability being delivered with the upgrade to the below deck equipment. Since the FY26 budget request, (V)6 VPX Upgrade Engineering Change Proposal (ECP) has been renamed AN/SLQ-32(V) Signal Processing Upgrade to more accurately describe full capability being delivered with the upgrade to the below deck equipment. The Signal Processing Upgrade is the below deck computing power behind surface EW capabilities. The Signal Processor upgrade integrates above deck hardware components with each other and the combat system. Signal Processing Upgrades are critical enablers of the added capabilities delivered by SEWIP block upgrades and next-generation LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 1 of 49 P-1 Line #46 Volume 2 - 167 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 4: Electronic Warfare Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Program Elements for Code B Items: 0204228N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A countermeasures. Countermeasures are a critical component of surface EW capability and integrate with the combat system and AN/SLQ-32 via the Signal Processing Upgrade. NULKA, Long Endurance Electronic Decoy (LEED), and MK-59 soft-kill threats use EM energy to deceive a threat's guidance system. Countermeasures are funded via Budget Line Item 5530. In FY27, Navy is taking a fresh approach to acquisition of AN/SLQ-32 systems. The program office is breaking from single source contracting and instead implementing an Indefinite Delivery / Indefinite Quantity Multiple Award Contract (IDIQ MAC) strategy aimed at lowering costs and broadening the surface EW industrial base. The new contracting approach will open competition for AN/SLQ-32 production contracts by empowering industry partners to bid at the individual task order level. Industry partners will no longer be required to deliver an entire AN/SLQ-32 system. Rather, they will leverage their core competencies by delivering components of an AN/SLQ-32 system. Individual components will be integrated by Navy's organic industrial base. Block 1 + Block 2 = AN/SLQ-32(V)6 Block 1 + Block 2 Lite = AN/SLQ-32C(V)6 Block 1 + Block 2 + Block 3 = AN/SLQ-32(V)7 Block 1 + Block 2 + SOEA = Nomenclature TBD TC056: SURFACE ELECTRONIC WARFARE (EW) IMPROVEMENTS BLOCK 1: The program will divest High-Gain High-Sensitivity (HGHS Block 1B3) and Specific Emitter Identification (SEI Block 1B2) capabilities. TC059: SURFACE ELECTRONIC WARFARE (EW) IMPROVEMENTS BLOCK 2: SEWIP Block 2 provides an upgraded antenna, receiver, and combat systems interface. The upgrades will pace the evolving threat, improve detection and accuracy, and mitigate Electromagnetic Interference (EMI). The Block 2 hardware cost includes the SEWIP Block 2 ES system, Blanker-Video Mixer Group (AN/SLA-10D), Common Processing System, Common Display System, Liquid Conditioning Unit, and Data Adaptation Processor. The SEWIP Block 2, and Block 3 units are installed conjunctively to compose the AN/SLQ-32(V)7 system. AN/SLQ-32 Signal Processing Upgrade: AN/SLQ-32(V) Signal Processing Upgrade (previously the (V)6 VPX Upgrade Engineering Change Proposal (ECP)) provides significant capability and reliability enhancements that greatly increase the AN/ SLQ-32(V) operator's tactical situational awareness and system availability. In addition, modernization provides the back-end computing power necessary to counter emerging threats. It increases system emitter processing throughput, reduces false detections/classifications, increases system fault tolerance, simplifies system maintenance, and is a critical enabler of future artificial intelligence (AI) capability growth required to rapidly ID and classify emerging unknown threat emitters. Signal Processing Upgrade is also a pre-requisite for EW systems currently in development, such as LEED and SOEA. TC060: SURFACE ELECTRONIC WARFARE (EW) IMPROVEMENTS BLOCK 3: Block 3 provides Electronic Attack (EA) capability improvement required for the AN/SLQ-32(V) system to keep pace with the evolving threat. The program builds on the EW Electronic Support (ES) capability delivered by Block 2 and will provide a common EA capability to surface ships (CVN, DDG, and LHD). The program works in concert with Scaled Onboard Electronic Attack (SOEA) and both are needed for effective Electronic Attack (EA) in the strike group. Block 3 Electronic Attack Rack Engineering Change Proposal (ECP): The Electronic Attack Rack Engineering Change Proposal (ECP) provides hardware and reliability improvements which focus on increasing the system's producibility, performance, and availability. The program works in concert with Scaled Onboard Electronic Attack (SOEA) and both are needed for effective Electronic Attack (EA) in the Strike group. TC070: LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 2 of 49 P-1 Line #46 Volume 2 - 168 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 4: Electronic Warfare Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Program Elements for Code B Items: 0204228N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Scaled Onboard Electronic Attack (SOEA) provides an advanced Electronic Attack (EA) counter targeting capability to keep pace with the evolving Anti-Ship Missile (ASM) threat. It will integrate into the SEWIP Family of shipboard Electronic Warfare systems. The program is scalable for Surface Combatants with Size, Weight, Power, and Cooling (SWaP-C) constraints that cannot support AN/ SLQ-32(V)7; however, it is not meant to replace AN/SLQ-32(V)7. SOEA will field incrementally as capability matures through a Middle Tier of Acquisition (MTA). Procurement of SOEA Phase 1 units will begin upon completion of development efforts in FY26. [P40A / TC956 - USCG WMSL AN/SLQ-32 B(V)2]: TC956 - UNITED STATES COAST GUARD (USCG) WMSL AN/SLQ-32B(V)2 This supports USCG Maritime Security Cutter, Large (WMSL) 758 and 759 with AN/SLQ-32B(V)2 systems and is in accordance with the requirements of OPNAVINST 4000.79A for Navy Type - Navy Owned (NTNO) material. NTNO material is procured by the Navy and installed by the USCG. [P40A / TC959 - SEWIP LITE FOR USCG SHIPS]: TC959 - SEWIP LITE FOR UNITED STATES COAST GUARD (USCG) SHIPS: This details the requirements for SEWIP Block 1B2 and SEWIP Lite systems in support of USCG ships, including Offshore Patrol Cutter (OPC), Maritime Security Cutter (WMSL), and Polar Security Cutter (PSC). OPNAVINST 4000.79A for Navy Type - Navy Owned (NTNO) material applies. USN is responsible for equipment procurement & USCG is responsible for the install. SEWIP Lite is a variant of the SEWIP Block 2 specifically tailored for the needs of small ships, such as Littoral Combat Ship (LCS), OPC, WMSL and PSC to address fleet emergent needs for a robust, capable, and sustainable EW system that meets the space, weight and power limitations of these smaller ships. This line also supports SEWIP Lite Shore systems provided as Navy Type - Navy Owned to the USCG in accordance with OPNAVINST 4000.79A for NTNO material. [P40A / TC960 - AN/SLQ-32 (V) TRAINING SYSTEMS]: TC960 - AN/SLQ-32 (V) TRAINING SYSTEMS This TC supports the procurement and installation of training systems in support of the AN/SLQ-32(V)6 and (V)7 systems including the Multipurpose Reconfigurable Training System (MRTS) and Electronic Warfare Tactical Simulator (TACSIM). MRTS provides support for Fleet maintenance training for SEWIP Block 2 and SEWIP Block 3. MRTS simulates the tactical system's components and subcomponents necessary for training without requiring the procurement of a full SEWIP Block 1B3, Block 2, or Block 3 system. The TACSIM training system provides tactically-representative SEWIP operator training for EW operators, including simulation capabilities for SLQ-32(V)6, SLQ-32(V)7, Soft Kill Coordination System (SKCS), combat system simulation of Ship Self Defense Ship (SSDS) and AEGIS, and system integration with the onboard Surface Electronic Warfare Team Trainer (SEWTT). [P40A / TC961 - SOLID STATE PRODUCT SUPPORT INTEGRATOR (PSI)]: TC961 - SOLID STATE PRODUCT SUPPORT INTEGRATOR (PSI) The Solid State Product Support Integrator (PSI) for Radio Frequency (RF) funding line supports the stand-up of this capability for select components of SEWIP Block 3. The Solid State PSI will provide engineering analysis and product support strategies as well as test and repair capabilities for the high band (HB) and low band (LB) transmit (Tx) and receive (Rx) components of SEWIP Block 3. Solid State PSI funding supports the procurements (investment expense) of HB and LB Tx and Rx module test and repair equipment. Engineering support includes the logistics, acquisition engineering, equipment installation, repair development, and program management associated with the Solid State PSI. [P40A / TC962 AN/SLQ-32 ENGINEERING CHANGE PROPOSALS]: TC962 - AN/SLQ-32(V)6 Engineering Change Proposals (ECP)]: TC962 - AN/SLQ-32 (V)6 Engineering Change Proposals AN/SLQ-32(V)6 Engineering Change Proposals (ECP) addresses documented deficiencies in system reliability, maintainability, survivability and obsolescence. Efforts supported are Non-Recurring Engineering (NRE), procurement of ECP kits, and integration / installation of ECP kits. [P40A / TC963 AN/SLQ-32 Test Sets]: TC963 - AN/SLQ-32 Test Sets supports the Non-Recurring Engineering (NRE) and procurement of test sets (above the investment threshold) for use in the organic AN/ SLQ-32(V)6 and AN/SLQ-32(V)7 Depot. The AN/SLQ-32(V)6 has been designated a core capability per 10 USC and Depot Source of Repair (DSOR) has been assigned to NSWC Crane. AN/SLQ-32(V)7 has begun the process of designating the DSOR in FY27. The number of fielded (V)6, C(V)6, and (V)7 continues to increase, therefore, an organic depot must be established to ensure the repair and return of failed Lowest Replaceable Units (LRUs), thus ensuring acceptable operational availability of the system. The organic and commercial industrial bases are not prepared to support the volume of AN/SLQ-32(V)6, C(V)6, and (V)7 repairs as the population of these systems continues to increase in the Fleet. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 3 of 49 P-1 Line #46 Volume 2 - 169 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 4: Electronic Warfare Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Program Elements for Code B Items: 0204228N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a AN/SLQ-32 - / 281.153 - / 51.462 - / 76.942 P-3a 1 / TC056 - BLOCK 1B2 FEDERATED SEI (SHIPALT/AIT) P-5a - / 64.625 - / 0.588 - / 0.928 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / TC056 - BLOCK 1B3 HGHS (SHIPALT/AIT) - / 182.814 - / 5.120 - / 13.051 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM (SHIPALT/AIT) / 1,640.462 - / 25.051 - / 64.386 - / 149.817 - / 0.000 - / 149.817 P-3a 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade (SHIPALT/AIT) / 0.000 - / 23.020 - / 38.897 - / 58.757 - / 0.000 - / 58.757 P-3a 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM (SHIPALT/AIT) / 971.405 - / 84.770 - / 165.894 - / 204.211 - / 0.000 - / 204.211 P-3a 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) (SHIPALT/AIT) - / 0.000 - / 0.000 - / 18.054 / 7.167 - / 0.000 P-3a 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) (SHIPALT/AIT) - / 0.000 - / 0.000 - / 44.552 - / 128.814 - / 0.000 - P-40 Total Gross/Weapon System Cost / 190.011 - / 422.704 - / 653.483 - / 0.000 - - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 3,140.459 - - / 104.717 - - / - - / 104.717 - / 7.167 / 128.814 / 653.483 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a AN/SLQ-32 P-3a 1 / TC056 - BLOCK 1B2 FEDERATED SEI (SHIPALT/AIT) P-5a - - / 0.000 / - - / 0.000 / - - / 0.000 / - - / 0.000 / - - / 0.960 - / 67.101 P-3a 2 / TC056 - BLOCK 1B3 HGHS (SHIPALT/AIT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 7.407 - / 208.392 P-3a 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM (SHIPALT/AIT) - / 19.506 - / 22.995 - / 9.904 - / 27.139 - / 131.388 P-3a 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade (SHIPALT/AIT) - / 20.778 - / 36.348 - / 56.247 - / 48.536 - / 540.165 P-3a 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM (SHIPALT/AIT) - / 295.438 - / 295.926 - / 310.105 - / 357.604 P-3a 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) (SHIPALT/AIT) - / 30.723 - / 16.997 - / 18.254 - / 25.432 P-3a 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) (SHIPALT/AIT) - / 166.726 - / 123.957 - / 84.258 - / 95.708 - / 2,233.091 - / 2,877.106 P-40 Total Gross/Weapon System Cost - / 559.341 - / 563.308 - / 569.910 - / 581.122 - / 8,232.046 - / 14,912.384 - / - / 4,770.167 - - - / 2,090.648 - - / 31.103 / - / 822.748 / 7,455.520 - / 147.730 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The increase in the budget request from FY26 to FY27 is driven by acceleration of procurement and fielding of Scaled Onboard Electronic Attack (SOEA), resulting in procurements increasing from 1 to 4. SEWIP Block 3 quantities increased from 0 to 1, SEWIP Block 2 quantities increased from 2 to 3 to ensure timely system delivery for FY29 AN/SLQ-32(V)6 installations. AN/SLQ-32 Signal Processing Upgrade procurement quantities increased from 10 to 11, reliability, environmental, and obsolescence non-recurring engineering increased, and ECP kit procurements were accelerated. Additionally, procurement unit costs for Block 2, AN/SLQ-32 Signal Processing Upgrade, and Block 3 have increased from FY26 to FY27 to reflect estimated pricing under new contracts. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 4 of 49 P-1 Line #46 Volume 2 - 170 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 4: Electronic Warfare Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Program Elements for Code B Items: 0204228N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 5 of 49 P-1 Line #46 Volume 2 - 171 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: AN/SLQ-32 Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) TC956 - USCG WMSL AN/SLQ-32 B(V)2 1.1) WMSL 758 AN/ SLQ-32 B(V)2 A 1.2) WMSL 759 AN/ SLQ-32 B(V)2 A 2,513K 1 2.513 - - - - - - - - - - - - - - - 2,543K 1 2.543 - - - - - - - - - - - - - - - 5.056 - - - - - - - - - - - - - - - 1.271 - - - - - - - - - - - - - - - - - - - 15.630 - - - - - - - - - - - - - - - - - - - 1.545 - - - - - - - - - Subtotal: 1) TC956 - USCG WMSL AN/SLQ-32 B(V)2 - - 2) TC959 - SEWIP LITE FOR USCG SHIPS 2.1) SEWIP BLOCK 1B2 A (1)(†) 2.2) SEWIP BLOCK 1B2 SHORE A 2.3) SEWIP BLOCK 2 A LITE (2)(†) 2.4) SEWIP LITE SHORE A 2.5) SEWIP CPS and A CDS for LITE (3)(†) 2.6) SEWIP BLOCK 2 LITE SHORE INSTALL A 2.7) PRODUCTION A SUPPORT (4) 2.8) ENGINEERING CHANGE PROPOSALS (ECPs) A (6) A 500,625.00 8 4.005 - - - 423,833.33 3 370,000.00 2 0.740 - - - - 4,788K 10 47.878 - - - 5,210K 4,693K 2 9.386 - - - - 708,166.67 6 4.249 - - - 414,500.00 2 0.829 - - - - - - - - - - - - - - - 3 - 515,000.00 3 - - 5.661 - - 1.089 - - 1.145 - - - - - - - - - - - 3.653 - - 0.631 - - 0.650 - - - - - - - - - - - 5.545 - - 1.105 - - 1.139 - - - - - - - - - - - 81.946 - - 2.825 - - 21.380 - - - - - - - - - (5) 2.9) INCO SPARES Subtotal: 2) TC959 - SEWIP LITE FOR USCG SHIPS 3) TC960 - AN/SLQ-32 (V) TRAINING SYSTEMS 3.1) SEWIP BLOCK 2 MRTS UNITS A 3.2) SEWIP BLOCK 3 MRTS UNITS A 3.3) SEWIP BLOCK 2 MRTS SOFTWARE NRE A 3.4) SEWIP BLOCK 3 MRTS SOFTWARE NRE A 3.5) TACSIM (†) A LI 2312 - AN/SLQ-32 Navy 600,000.00 2 1.200 - - - - - - - - - - - - - - - 705,000.00 2 1.410 - - - - - - - - - - - - - - - - - 3.752 - - - - - - - - - - - - - - - - - 4.102 - - 0.305 - - - - - - - - - - - - 23 5.071 241,000.00 0.723 - - - - - - - - - - - - 220,478.26 3 UNCLASSIFIED Page 6 of 49 P-1 Line #46 Volume 2 - 172 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Subtotal: 3) TC960 - AN/SLQ-32 (V) TRAINING SYSTEMS Unit Cost ($) Qty (Each) - FY 2025 Total Cost ($ M) - Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: AN/SLQ-32 Unit Cost ($ M) ($) 15.535 - - 1.028 4.882 - - - - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - 0.875 - - - - - - - - - 4) TC961 - SOLID STATE PRODUCT SUPPORT INTEGRATOR (PSI) 4.1) HIGH BAND TRANSMIT AND RECEIVE EQUIPMENT A 976,400.00 4.2) LOW BAND TRANSMIT AND RECEIVE EQUIPMENT A 4.3) Engineering A Support 5 (8) Subtotal: 4) TC961 - SOLID STATE PRODUCT SUPPORT INTEGRATOR (PSI) 5.1) RMA/INT Non Recurring Engineering A 5.2) RMA/INT Kit Procurement (Installation Cost Required) A 5.3) RMA/INT Kit Procurement (Installation Cost Not A (10) - 4.307 - - - - - - - - - - - - - - - - - 1.995 - - 1.543 - - 1.284 - - 0.909 - - - - - 0.909 - - 11.184 - - 1.543 - - 2.159 - - 0.909 - - - - - 0.909 - 57.416 - - 1.879 - - 2.411 - - 4.470 - - - - - 4.470 268,227.27 44 11.802 - - - - - - - - - - - - - - - 259,612.90 62 16.096 266,277.78 54 72 19.944 - - - 72 19.944 139,916.67 48 6.716 - - - - - - - - - - - - - - - - 10.373 - - 2.495 - - 2.446 - - 4.783 - - - - - 4.783 13,636.36 11 0.150 - - - - - - 212,000.00 10 2.120 - - - 212,000.00 10 2.120 A 5.5) Environmental Non Recurring A Engineering (12) 5.6) Environmental Kit Procurement (Installation Cost 13,676.83 656 8.972 101 1.682 50 0.849 17,312.50 10 0.173 - - - 17,312.50 10 0.173 10,215.19 158 1.614 - - - - - - - - - - - 14.379 271,578.95 19 5.160 277,000.00 277,000.00 - A (13)(†) 5.7) Environmental Kit Procurement (Installation Cost Not Required) - (9) (11)(†) 5.4) RMA/INT Kit Installation Required) 1 - 5) TC962 AN/SLQ-32 ENGINEERING CHANGE PROPOSALS Required) 875,000.00 (7)(†) A 16,653.47 16,980.00 (14)(†) 5.8) Environmental Kit Installation A LI 2312 - AN/SLQ-32 Navy - - UNCLASSIFIED Page 7 of 49 - P-1 Line #46 - Volume 2 - 173 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.9) Obsolescence Non Recurring A Engineering Code Unit Cost Qty (Each) Unit Cost ($ M) ($) - 23.227 189,784.62 65 41,852.94 - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) - 2.210 12.336 203,434.78 27 34 1.423 1 - - - - - - - Installation Procurement A (18)(†) A Subtotal: 5) TC962 AN/SLQ-32 ENGINEERING CHANGE PROPOSALS 6) TC963 AN/SLQ-32 Test Sets 6.1) (V)6 Test Set NRE and Support (20) 6.2) AN/SLQ-32(V)6 (21)(†) 6.3) (V)7 Test Set ($) 2.910 5.493 206,000.00 40 44,000.00 0.044 2 45,000.00 Qty (Each) - Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) - 2.968 - - - 8.240 210,125.00 16 3.362 - - - 0.090 - - - - - 28 21.252 - - - - Total Cost Qty (Each) ($ M) - 2.968 210,125.00 16 3.362 - - 28 21.252 - - - - 150.125 - - 28.182 - - 22.106 - - 59.072 - - - - - 59.072 759,000.00 9.327 - - 3.318 - - 2.782 - - 5.286 - - - - - 5.286 7.783 1,353K 6.764 1,380K 6.899 1,407K 14 19.704 - - - 1,407K 14 19.704 - 3.477 - 2.546 - - 5.348 - - - - - 5.348 16 14.398 (19) A A A 1,557K 5 5 - - - - - - - - - Subtotal: 6) TC963 AN/SLQ-32 Test Sets - - 17.307 - - 17.884 - Total - - 281.153 - - 51.462 - (23)(†) 759,000.00 - - 0.197 6.5) SLQ-32(V)7 EA Characterization Test - - - (22) 6.4) AN/SLQ-32(V)7 A A (24)(†) - 865,000.00 5 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) ($ M) - - NRE and Support Set (Each) Unit Cost FY 2027 OOC Total Cost A (17)(†) 5.12) AAPA Kit Test Sets Qty - FY 2027 Base Total Cost (16)(†) 5.11) Liquid Cooling Unit Back Fit Test Sets ($) - (15) 5.10) Obsolescence Kit Procurement (Installation Cost Not Required) MAIS FY 2025 Total Cost Aggregated Items Title: AN/SLQ-32 5 - 4.325 882,250.00 8 7.058 899,875.00 16 14.398 - - - 1 12.012 - - - - - - - - - - 31.297 - - 44.736 - - - - - 44.736 - 76.942 - - 104.717 - - - - - 104.717 12,012K 899,875.00 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) The FY27 SEWIP Block 1B2 2.1. quantity decreases from 3 in FY26 to 0 in FY27 is due to the divestment of the Specific Emitter Identification (SEI Block 1B2) capabilities embedded in SEWIP Block 2 Lite. The FY27 SEWIP Block 2 Lite 2.3. quantity decreases from 3 in FY26 to 0 in FY27 is due to funding reduction in FY27 to support higher Navy priorities. The FY27 SEWIP CPS and CDS for Lite 2.5. quantity decreases from 3 in FY26 to 0 in FY27 is due to funding reduction in FY27 to support higher Navy priorities. The FY27 Production Support 2.7 decreases to 0 due to funding reduction in FY27 to support higher Navy priorities. The FY27 ECPs 2.8 decreases to 0 due to funding reduction in FY27 to support higher Navy priorities. INCO Spares 2.9 decreases from FY26 to FY27 is due to funding reduction in FY27 to support higher Navy priorities. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 8 of 49 P-1 Line #46 Volume 2 - 174 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Aggregated Items Title: AN/SLQ-32 (7) High Band Transmit and Receive Equipment 4.1 quantity decreases from 1 in FY26 to 0 in FY27 to align with Engineering Support requirements which includes logistics, acquisition engineering, equipment installation, repair documentation, and program management associated with the Solid State PSI. Since the FY25 budget request, FY25 procurements have been removed from the budget. (8) Solid State Product Support Integrator (PSI) 4.3 decrease from FY26 to FY27 aligns with engineering support requirements which includes logistics, acquisition engineering, equipment installation, repair documentation, and program management associated with the Solid State PSI. (9) TC962 - AN/SLQ-32(V)6 Engineering Change Proposals (ECP) addresses documented deficiencies in system reliability, maintainability, survivability and obsolescence. Efforts supported are Non-Recurring Engineering (NRE), procurement of ECP kits, and integration / installation of ECP kits. The ECP kits will be installed during Production Integration Test (PIT) for units delivered to the Government but not yet installed on ships. There is no installation cost associated with units incorporated during PIT. The requirement for these kits is reflected in 5.3, 5.7, and 5.10 (Installation Cost Not required). Reliability, Maintainability and Availability (RM&A) / Integration (INT), (ECP) efforts are to maintain and meet Operational Availability (Ao) requirements. Current metrics show that the systems are performing below reliability requirements 5.1, 5.2, 5.3 and 5.4. Environmental ECP efforts are to correct identified issues with environmental survivability, including correction of shock deficiencies, and to meet system survivability requirements 5.5, 5.6, 5.7 and 5.8. Obsolescence ECPs correct identified obsolete parts issues and implement corrective action to ensure that the systems remain supportable, sustainable, and affordable throughout the planned lifecycle 5.9 and 5.10. (10) RMA/INT Non-Recurring Engineering 5.1 is to maintain and meet Operational Availability (Ao) requirements. Increase from FY26 to FY27 is based on qualification activities required to accelerate procurements and installation of ECPs that increase the reliability and overall system readiness of AN/SLQ-32(V)6 for the warfighter. (11) Reliability, Maintainability and Availability (RM&A) Kit 5.3 requirements are to maintain and meet Operational Availability (Ao) requirements. Current metrics show that the systems are performing below reliability requirements. Quantity requirements for 5.3 increase from 19 in FY26 to 72 in FY27 to align with AN/SLQ-32(V)6 production integration requirements. (12) Environmental Non-Recurring Engineering ECP 5.5 is to correct identified issues with environmental survivability, including correction of shock deficiencies, and to meet survivability requirements. Increase from FY26 to FY27 is based on alignment with AN/SLQ-32(V) Production Integration requirements. (13) Environmental Kit Procurement (Installation Cost Required) 5.6 supports efforts to correct identified issues with environmental survivability, including correction of shock deficiencies, and to meet system survivability requirements. Quantity and funding increases from 0 in FY26 to 10 in FY27 to align with AN/SLQ-32(V) Production Integration requirements. (14) Environmental Kit Procurement ECP (Installation Cost Not Required) 5.7 is to correct identified issues with environmental survivability, including correction of shock deficiencies, and to meet system survivability requirements. Quantity requirements decreased from 50 in FY26 to 10 in FY27 to align with AN/SLQ-32(V) Production Integration requirements. (15) Obsolescence Non-Recurring Engineering ECPs 5.9 efforts correct identified obsolete parts issues and implement corrective action to ensure that the systems remain supportable, sustainable, and affordable throughout the planned lifecycle. (16) Obsolescence Kit (Installation Cost Not Required) 5.10 is to address identified obsolete parts issues. Quantity requirements for 5.10 decreased from 40 in FY26 to 16 in FY27 to align with AN/SLQ-32(V)6 Production Integration requirements. (17) (18) Liquid Cooling Unit Back Fit Installation 5.11 requirements decreased from 2 in FY26 to 0 in FY27 due to installations ending in FY26. Antenna Array Panel Assembly (AAPA) Kit Procurement 5.12 addresses documented RM&A and Environmental issues for the AAPA. In-Service AAPAs have failed at an unexpected rate and have had to be replaced by new productions. AAPA kits have a 2-year lead time. Additionally, these AAPAs will have to be used to restore production units that have been consumed to maintain fleet operational availability. Decrease to FY26 AAPA 5.12 since FY26 budget request is due to removal of funding from the budget which procured 52 AAPA Kits. FY27 quantity of 28 is based on fielding requirements in FY29. (19) (20) AN/SLQ-32 Test Sets supports the Non-Recurring Engineering (NRE) and procurement of test sets (above the investment threshold) for use in the organic AN/SLQ-32(V)6 and (V)7 Depot. AN/SLQ-32(V)6 Test Sets NRE and Support 6.1 increases from FY26 to FY27 to align with equipment requirements for Organic Depot Standup in support of AN/SLQ-32(V)6 systems and overall system readiness of AN/SLQ-32(V)6 for the warfighter. (21) (22) (23) (24) AN/SLQ-32(V)6 Test Sets 6.2 increase from quantity 5 in FY26 to 14 in FY27 aligns with the equipment requirements for Organic Depot Standup in support of AN/SLQ-32(V)6. AN/SLQ-32(V)7 Test Sets NRE and Support 6.3 increases from FY26 to FY27 to align with equipment requirements for Organic Depot Standup in support of AN/SLQ-32(V)7 systems. AN/SLQ-32(V)7 Test Sets 6.4 increase from quantity 8 in FY26 to 16 in FY27 aligns with the equipment requirements for Organic Depot Standup in support of AN/SLQ-32(V)7 systems. SLQ-32(V)7 EA Characterization Test Set 6.5 provides the necessary test capability to verify and validate SLQ-32(V)7 EA capabilities against threats. Quantity decreases from 1 in FY26 to 0 in FY27 based on completion of effort in FY26. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 9 of 49 P-1 Line #46 Volume 2 - 175 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Aggregated Items: AN/SLQ-32 Contractor and Location Method/Type or Funding Vehicle 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2026 Nov 2026 3 423,833.33 Y Mar 2016 2026 Lockheed Martin / Syracuse, NY C / FFP Washington Navy Yard Jun 2026 Sep 2027 3 5,210K Y Dec 2019 2024 DRS Laurel Tech / Johnstown, PA / Johnstown, PA C / FFP Washington Navy Yard Mar 2025 Jul 2026 1 370,000.00 Y Mar 2019 2026 DRS Laurel Tech / Johnstown, PA / Johnstown, PA C / FFP Washington Navy Yard Jun 2026 Oct 2027 3 515,000.00 Y Mar 2019 Simventions / Fredricksburg, VA C / FFP NSWC Dahlgren Sep 2025 Sep 2026 3 241,000.00 Y Mar 2023 C / FFP NSWC Crane Jun 2026 Jul 2027 1 875,000.00 Y Oct 2020 FY Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) TC959 - SEWIP LITE FOR USCG SHIPS 2.1) SEWIP BLOCK 1B2 (1) 2.3) SEWIP BLOCK 2 LITE (2) 2.5) SEWIP CPS and CDS for LITE (3) 2.5) SEWIP CPS and CDS for LITE (3) 3) TC960 - AN/SLQ-32 (V) TRAINING SYSTEMS 3.5) TACSIM 2025 4) TC961 - SOLID STATE PRODUCT SUPPORT INTEGRATOR (PSI) 4.1) HIGH BAND TRANSMIT AND RECEIVE EQUIPMENT (7) 2026 Crane Organic / Crane, Indiana 5) TC962 AN/SLQ-32 ENGINEERING CHANGE PROPOSALS 5.3) RMA/INT Kit Procurement (11) 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jul 2025 Oct 2026 54 266,277.78 Y Oct 2020 (11) 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Jul 2027 19 271,578.95 Y Oct 2020 (11) 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Apr 2028 72 277,000.00 Y Oct 2020 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Apr 2028 10 212,000.00 Y Oct 2020 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jul 2025 Oct 2026 101 16,653.47 Y Oct 2020 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Sep 2027 50 16,980.00 Y Oct 2020 (14) 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Oct 2026 Jan 2028 10 17,312.50 Y Oct 2020 5.10) Obsolescence Kit Procurement (Installation Cost Not 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jul 2025 Oct 2026 27 203,434.78 Y Oct 2020 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Sep 2027 40 206,000.00 Y Oct 2020 (Installation Cost Not Required) 5.3) RMA/INT Kit Procurement (Installation Cost Not Required) 5.3) RMA/INT Kit Procurement (Installation Cost Not Required) 5.6) Environmental Kit Procurement (Installation Cost Required) (13) 5.7) Environmental Kit Procurement (Installation Cost Not Required) (14) 5.7) Environmental Kit Procurement (Installation Cost Not Required) (14) 5.7) Environmental Kit Procurement (Installation Cost Not Required) Required) (16) 5.10) Obsolescence Kit Procurement (Installation Cost Not Required) (16) LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 10 of 49 P-1 Line #46 Volume 2 - 176 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 Item Number / Title [DODIC] 5.10) Obsolescence Kit Procurement (Installation Cost Not Required) (16) 5.11) Liquid Cooling Unit Back Fit Installation (17) 5.11) Liquid Cooling Unit Back Fit Installation (17) 5.12) AAPA Kit Procurement (18) O O C P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Aggregated Items: AN/SLQ-32 FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Jun 2028 16 210,125.00 Y Oct 2020 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane Nov 2024 Apr 2026 1 44,000.00 Y Dec 2017 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Nov 2025 Oct 2026 2 45,000.00 Y Dec 2017 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Mar 2028 28 759,000.00 Y Dec 2025 Jun 2026 Jun 2027 5 1,353K Y Mar 2021 Qty (Each) RFP Issue Date 6) TC963 AN/SLQ-32 Test Sets 6.2) AN/SLQ-32(V)6 Test Sets (21) 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane 6.2) AN/SLQ-32(V)6 Test Sets (21) 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Sep 2027 5 1,380K Y Mar 2021 6.2) AN/SLQ-32(V)6 Test Sets (21) 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Mar 2028 14 1,407K Y Mar 2021 6.4) AN/SLQ-32(V)7 Test Sets (23) 2025 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Sep 2027 5 865,000.00 Y Dec 2022 6.4) AN/SLQ-32(V)7 Test Sets (23) 2026 Crane Organic / Crane, Indiana C / FFP NSWC Crane Jun 2026 Oct 2027 8 882,250.00 Y Dec 2022 6.4) AN/SLQ-32(V)7 Test Sets (23) 2027 Crane Organic / Crane, Indiana C / FFP NSWC Crane Mar 2027 Jul 2028 16 899,875.00 Y Dec 2022 2026 TBD / TBD C / FFP TBD Jun 2026 Jun 2027 1 12,012K Y Dec 2025 6.5) SLQ-32(V)7 EA Characterization Test Set (24) LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 11 of 49 P-1 Line #46 Volume 2 - 177 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / TC056 - BLOCK 1B2 FEDERATED SEI MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 64.625 0.588 0.928 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.960 67.101 Total - - - - - - - - - - - - 64.625 0.588 0.928 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.960 67.101 - - - - - - - - - - - - 64.625 0.588 0.928 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.960 67.101 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The SEWIP Block 1B2 federated Specific Emitter Identification (SEI), consisting of SEI hardware plus an Improved Console and Display (ICAD) modification kit, fully integrates SEI functionality with the ICAD/ Q-70 console. Notes: The program will divest Specific Emitter Identification (SEI Block 1B2) capabilities. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 12 of 49 P-1 Line #46 Volume 2 - 178 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TC056 SURFACE EW IMPROVEMENTS BLOCK 1: BLOCK 1B2 FEDERATED SEI Prior Years Financial Plan Modification Number / Title: 1 / TC056 - BLOCK 1B2 FEDERATED SEI Modification Type: SHIPALT/AIT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: TC056 - BLOCK 1B2 FEDERATED SEI B Kits Recurring 1.1.1) FMP SHIP UNITS - NonOrganic 71 / 26.549 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.138 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.931 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.2) NON-FMP SHORE SITE UNITS - NonOrganic 1.1.3) Installation and Check Out (INCO) Spares Organic Subtotal: Recurring Subtotal: TC056 - BLOCK 1B2 FEDERATED SEI Subtotal: Procurement, All Modification Items - / 28.618 - / - - / - - / - - / - - / - - / - - / - - / - - / - 74 / 28.618 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 28.618 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 0.000 - / / 0.000 - 71 / 26.549 3 / 1.138 - / 0.931 / 28.618 - 74 / 28.618 / 28.618 - Support (All Modification Items) 2.1) Production Support - / 9.143 / 0.139 - / - - / - - / - - / - - / - - / - - / - - / - - / 9.417 2.2) Tech Refresh - / 6.470 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.470 2.3) Engineering Change Proposals (ECPs) - / 0.173 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 16.060 / 0.000 - / 0.960 - / 22.423 / - - / 0.960 - / 22.423 Subtotal: Support - / 0.135 - - / 15.786 - / 0.135 - / 0.139 Modification Item 1 of 1: TC056 - BLOCK 1B2 FEDERATED SEI - / 20.221 - / 0.453 - / 0.789 Subtotal: Installation - / 20.221 - / 0.453 - / 0.789 / 0.173 Installation - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 64.625 0.588 0.928 0.000 0.000 UNCLASSIFIED Page 13 of 49 0.000 0.000 0.000 P-1 Line #46 0.000 0.000 0.960 67.101 Volume 2 - 179 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TC056 - BLOCK 1B2 FEDERATED SEI MDAP/MAIS Code: Modification Item 1 of 1: TC056 - BLOCK 1B2 FEDERATED SEI Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP SHIP UNITS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 65 / 19.641 71 / 21.843 Prior Years 0 / 0.453 2 / 0.789 - / - - / - - / - - / - - / - - / - - / - 4 / 0.960 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.789 - / - - / - - / - - / - - / - - / - - / - 4 / 0.960 Total 65 / 19.641 0 / 0.453 71 / 21.843 Installation Schedule FY 2025 FY 2026 PYS Q1 Q2 Q3 Q4 In 65 - - - - Out 65 - - - - Q1 FY 2028 FY 2029 FY 2030 FY 2031 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 1 - - - - - - - - - - - - - - - - - - - - - - 4 71 - - - - - - - - - - - - - - - - - - - - 4 71 1 - FY 2027 Q2 - 1 1 Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP SHORE SITE UNITS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 3 / 0.580 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.580 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 14 of 49 P-1 Line #46 Volume 2 - 180 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / TC056 - BLOCK 1B2 FEDERATED SEI MDAP/MAIS Code: Modification Item 1 of 1: TC056 - BLOCK 1B2 FEDERATED SEI Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP SHORE SITE UNITS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 3 / 0.580 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost / - - / - 3 / 0.580 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 Out 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 15 of 49 P-1 Line #46 Volume 2 - 181 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / TC056 - BLOCK 1B3 HGHS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 182.814 182.814 182.814 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 5.120 13.051 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.407 - - - - - - - - - - 5.120 13.051 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.407 - - - - - - - - - - 5.120 13.051 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.407 Total 208.392 208.392 208.392 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Block 1B3: High Gain High Sensitivity (HGHS) Notes: The program will divest High-Gain-Sensitivity (HGHS Block 1B3) capabilities. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 16 of 49 P-1 Line #46 Volume 2 - 182 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TC056 SURFACE EW IMPROVEMENTS BLOCK 1 - BLOCK 1B3 HGHS Prior Years Financial Plan Modification Number / Title: 2 / TC056 - BLOCK 1B3 HGHS Related RDT&E PEs: 0604757N Modification Type: SHIPALT/AIT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: TC056 - BLOCK 1B3 HGHS B Kits Recurring 1.1.1) FMP BLOCK 1B3 for SLQ-32 (V)6 - NonOrganic 83 / 67.300 - / - 2 / 5.026 - / - - / - - / - - / - - / - - / - - / - - / - 85 / 72.326 1.1.2) BLOCK 1B3 Uneconomical to Repair - Organic 10 / 8.108 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 8.108 1.1.3) FMP BLOCK 1B3 for SLQ-32 (V)7 - NonOrganic 4 / 3.201 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 3.201 1.1.4) NON-FMP BLOCK 1B3 SHORE SITE NonOrganic 7 / 8.466 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 8.466 1.1.5) BLK 1B3 GFE UNIT FOR BLK 3 OEM NonOrganic 2 / 2.602 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.602 / 4.584 - / - - / 0.497 - / - - / - - / - - / - - / - - / - - / - - / - - 1.1.6) Installation and Check Out (INCO) Spares Organic Subtotal: Recurring - / 94.261 - / - 106 / 94.261 - / - - / 94.261 - / - - / 25.863 - - / 25.863 - Modification Item 1 of 1: TC056 - BLOCK 1B3 HGHS - / 62.690 Subtotal: Installation - / 62.690 Subtotal: TC056 - BLOCK 1B3 HGHS Subtotal: Procurement, All Modification Items - / 5.523 - / - - / - - / - - / - - / - - / - - / - 2 / 5.523 - / - - / - - / - - / - - / - - / - - / - - / 5.523 - / - - / - - / - - / - - / - - / - - / - / 1.291 - / 1.317 - / - - / - - / - - / - - / - - / - - / - / 1.291 - / 1.317 - / - - / - - / - - / - - / - - / - - / - - - / 3.829 - / 6.211 / 0.000 - - / 3.829 - / 6.211 / - - / 0.000 - / - - / 5.081 / 99.784 108 / 99.784 / 0.000 - / 99.784 / - - / 28.471 / 0.000 - / 28.471 / 7.407 - / 80.137 / 7.407 - / 80.137 Support (All Modification Items) 2.1) Production Support Subtotal: Support - Installation - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 182.814 5.120 13.051 0.000 0.000 UNCLASSIFIED Page 17 of 49 0.000 0.000 0.000 P-1 Line #46 0.000 0.000 7.407 208.392 Volume 2 - 183 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / TC056 - BLOCK 1B3 HGHS MDAP/MAIS Code: Modification Item 1 of 1: TC056 - BLOCK 1B3 HGHS Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: SYRACUSE, NY Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 23 FY 2025 FY 2026 Contract Dates Mar 2026 Delivery Dates Feb 2028 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: FMP BLOCK 1B3 for SLQ-32 (V)6 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 70 / 56.863 83 / 70.238 Prior Years 3 / 2.856 7 / 6.075 - / - - / - - / - - / - - / - - / - - / - 3 / 4.444 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - 0 / 0.136 - / - - / - - / - - / - - / - - / - - / - 2 / 2.963 2 / 3.099 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 6.211 - / - - / - - / - - / - - / - - / - - / - 5 / 7.407 Total 70 / 56.863 3 / 2.856 / - - / - 85 / 73.337 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 70 - - 2 1 4 3 - - - - - - - 1 1 - - - - - - - - - - - - - 3 85 Out 58 - 1 3 - - - - - - - - - - - - - 7 85 2 - 1 3 1 4 3 - - - 1 1 Method of Implementation: SHIPALT/AIT:: Installation Name: FMP BLOCK 1B3 for SLQ-32 (V)7 Installation Cost Prior Years LI 2312 - AN/SLQ-32 Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 3.324 1 / 0.973 - - - - - - - - 0 / 0.000 4 / 4.297 / - / - / - UNCLASSIFIED Page 18 of 49 / - / - / - P-1 Line #46 / - / - Volume 2 - 184 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / TC056 - BLOCK 1B3 HGHS MDAP/MAIS Code: Modification Item 1 of 1: TC056 - BLOCK 1B3 HGHS Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP BLOCK 1B3 for SLQ-32 (V)7 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 3 / 3.324 1 / 0.973 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 4 / 4.297 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 4 Out 1 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 4 1 1 Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLOCK 1B3 SHORE SITE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 7 / 2.143 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 2.143 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 7 / 2.143 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 19 of 49 P-1 Line #46 7 / 2.143 Volume 2 - 185 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / TC056 - BLOCK 1B3 HGHS MDAP/MAIS Code: Modification Item 1 of 1: TC056 - BLOCK 1B3 HGHS Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLOCK 1B3 SHORE SITE Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Out 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Method of Implementation: SHIPALT/AIT:: Installation Name: BLK 1B3 GFE UNIT FOR BLK 3 OEM Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 0.360 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.360 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 0.360 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.360 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Out 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Method of Implementation (Organic): BLOCK 1B3 Uneconomical to Repair - Not Installed LI 2312 - AN/SLQ-32 Navy Installation Quantity: 10 UNCLASSIFIED Page 20 of 49 P-1 Line #46 Volume 2 - 186 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Prior Years 1,640.462 1,640.462 1,640.462 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 25.051 64.386 19.506 22.995 9.904 27.139 - - 25.051 64.386 - - 25.051 64.386 149.817 - 0.000 - 149.817 - 0.000 - 149.817 0.000 149.817 149.817 149.817 To FY 2031 Complete - - - - 19.506 22.995 9.904 27.139 - - - - 19.506 22.995 9.904 27.139 Total 131.388 2,090.648 131.388 2,090.648 131.388 2,090.648 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM SEWIP Block 2 provides AN/SLQ-32(V) an upgraded antenna, receiver, and combat systems interface. The upgrades will pace the evolving threat, improve detection and accuracy and mitigate Electromagnetic Interference (EMI). The Block 2 hardware cost includes the SEWIP Block 2 ES system, Blanker-Video Mixer Group (AN/SLA-10D), Common Processing System, Common Display System, Liquid Conditioning Unit and Data Adaptation Processor. The SEWIP Block 2 and Block 3 units are installed conjunctively to compose the AN/SLQ-32(V)7 system. The SEWIP Block 2 P-3a funding is broken out to separately show systems installed with FMP Block 2 for SLQ-32 (V)6 and systems installed with SEWIP Block 3 FMP Block 2 for SLQ-32(V)7. Notes: (1) The SEWIP Block 2 system is being installed as a back fit on the limited number of ships. The budget submission reflects that the procurement and installation schedules have changed significantly due to several factors including the number of units procured in prior years, changes in ship availabilities and schedules. (2) The FY27 budget request of $149.817M supports procurement of 3 FMP Block 2 systems with V6, production support, INCO Spares, refurbishment of rotatable pool assets, installation of 3 FMP Block 2 systems with V6, Block 2 Refurbishment for Partial systems to restore incomplete systems with missing parts consumed to maintain fleet operational availability, procurement of 4 MK6 MODX Common Processing System (CPS) and Common Display System (CDS) for FMP Block 2 systems and 8 MK6 MODX procurements for lab assets (Shore Sites Units), and Design Services Allocation for units to be installed in future years. Additionally, budget request supports efforts to address reliability, obsolescence and combat system integration system issues that negatively impact system readiness. (3) Production Support provides government oversight for production of hardware and hardware components and is composed primarily of Warfare Center Activity and Original Equipment Manufacturer (OEM) support of production related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA) and Professional Support Services (PSS). Also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (4) SEWIP installations are phased over three years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Installation funding for AP and planning yard DSA is required in both of the 2 years prior to the year of installation to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Total cost for installations shows both current year installation funding for the quantity of installations in addition to AP and planning yard DSA for current year and/or following year installs. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 21 of 49 P-1 Line #46 Volume 2 - 187 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Related RDT&E PEs: 0604757N Models of Systems Affected: TC059 SURFACE EW Modification Type: SHIPALT/AIT IMPROVEMENTS BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM B Kits Recurring 83 / 899.387 - / - 1.1.2) BLOCK 2 Uneconomical to Repair - Organic 10 / 106.379 - / - - / - - 1.1.3) FMP BLOCK 2 for SLQ-32 (V)7 - NonOrganic 4 / 38.367 - / - - / - - 1.1.4) NON-FMP BLK2 SHORE SITE UNITS NonOrganic 7 / 52.598 - / - - / - 1.1.5) BLK2 GFE FOR BLK3 OEM - NonOrganic 1 / 11.556 - / - - 1.1.6) BLK 2 ROTATABLE POOL - Organic 3 / 30.267 - / - - 1.1.1) FMP BLOCK 2 for SLQ-32 (V)6 - NonOrganic (25) 2 / 25.004 3 / 52.359 - / - 3 / 52.359 - / - - / - - / - / - - / - - / - - / - - - / - - / - / - - / - - / - - / - - 1 / 17.037 4 / 72.237 93 / 1,066.024 / - - / - - / - - / - - / - - / - 10 / 106.379 / - - / - - / - - / - - / - - / - 4 / 38.367 - / - - / - - / - - / - - / - - / - 7 / 52.598 / - - / - - / - - / - - / - - / - - / - 1 / 11.556 / - - / - - / - - / - - / - - / - - / - 3 / 30.267 1.1.7) MK6 MODX CPS/CDS for SLQ-32(V)6 - Organic - / - - / - - / - 4 / 5.744 - / - 4 / 5.744 - / - - / - - / - - / - - / - 4 / 5.744 1.1.8) MK6 MODX CPS/CDS for SHORE SITE UNITS - - / - - / - - / - 8 / 16.160 - / - 8 / 16.160 - / - - / - - / - - / - - / - 8 / 16.160 - / 5.370 - / - - / 5.813 - / - - / 35.901 / 42.875 - / - / 3.892 - / - (26) Organic (27) 1.1.9) BLK 2 REFURBISHMENT FOR ROTATABLE POOL - NonOrganic - (28) 1.1.10) BLK 2 Refurbishment for Partial Systems Organic - (29) 1.1.11) Installation and Check Out (INCO) Spares Organic - (30) Subtotal: Recurring Subtotal: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Subtotal: Procurement, All Modification Items / 2.570 - / 2.666 / - - / - / 28.828 - / - - / 1,169.952 - / 2.666 108 / 1,169.952 - / 2.666 / 1,169.952 - / 2.666 - / 93.342 - / 2.468 - - / 93.342 - / 2.468 - - - / 2.719 / / 2.307 / 30.030 - - - - / 5.477 - / 5.587 - / 5.699 - / - - / - - / - - / - - / - - / 42.875 / 3.892 - / - - / - - / - - / - - / - - / 35.027 / 126.400 - / - - / 126.400 - / 5.477 - / 5.587 - / 5.699 - / - 15 / 126.400 - / 5.477 - / 5.587 - / 5.699 / 126.400 - / - - / 126.400 - / 5.477 - / 5.587 - / 5.699 / 2.517 - / 6.757 - / - - / 6.757 - / 4.042 - / 4.123 - / 4.205 / 2.517 - / 6.757 - / - - / 6.757 - / 4.042 - / 4.123 - / 4.205 / 30.030 - - - / 42.875 15 / 126.400 2 / 30.030 - - / 5.370 / 22.850 - - 1 / 22.850 / 72.237 / 1,440.898 - 4 / 72.237 130 / 1,440.898 / 22.850 - / 72.237 - / 4.289 - / 12.369 - / 134.112 - / 4.289 - / 12.369 - / 134.112 - / 1,440.898 - Support (All Modification Items) 2.1) Production Support Subtotal: Support Installation LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 22 of 49 P-1 Line #46 Volume 2 - 188 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Related RDT&E PEs: 0604757N Models of Systems Affected: TC059 SURFACE EW Modification Type: SHIPALT/AIT IMPROVEMENTS BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM - / 377.168 - / 19.917 - / 31.839 - / 16.660 Subtotal: Installation - / 377.168 - / 19.917 - / 31.839 - / 16.660 - / 0.000 - / 16.660 - / 9.987 - / 13.285 / - - / 16.660 - / 9.987 - / 13.285 - - / 0.000 - / - - / 0.000 - / 46.782 - / 515.638 / - - / 46.782 - / 515.638 Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 1,640.462 25.051 64.386 149.817 0.000 UNCLASSIFIED Page 23 of 49 149.817 19.506 22.995 P-1 Line #46 9.904 27.139 131.388 2,090.648 Volume 2 - 189 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Syracuse, NY (31) Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 23 FY 2026 FY 2027 Contract Dates FY 2025 Jun 2026 Mar 2027 FY 2028 FY 2029 FY 2030 Mar 2031 FY 2031 Delivery Dates May 2028 Feb 2029 Feb 2033 Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP BLOCK 2 for SLQ-32 (V)6 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 70 / 351.974 3 / 14.926 7 / 29.768 3 / 12.671 0 / 0.000 3 / 12.671 - / - - / - - / - - / - 0 / 0.000 83 / 409.339 - / - - / - - / - - / - - - / - - / - - / - 0 / 0.000 2 / 11.623 3 / 13.285 3 / 17.709 Prior Years FY 2025 - / - - / - - FY 2026 - / - - / - 0 / 2.071 0 / 0.781 0 / 0.000 0 / 0.781 2 / 8.771 FY 2027 - / - - / - - / - 0 / 3.208 0 / 0.000 0 / 3.208 0 / 1.216 - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 9.206 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 37.576 4 / 37.576 3 / 13.285 - / - - / - 5 / 46.782 93 / 485.453 To Complete Total 70 / 351.974 3 / 14.926 / - - 7 / 31.839 / - - 3 / 16.660 / - - 0 / 0.000 / - 3 / 16.660 2 / 9.987 / - - / - 1 / 9.206 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 70 - - 2 1 4 3 - - 1 1 1 - - 1 1 - 1 1 - 1 - - - - - - - - 5 93 Out 58 - 1 5 2 1 1 1 1 - - - - - - 8 93 2 LI 2312 - AN/SLQ-32 Navy - 1 3 1 - 1 3 1 UNCLASSIFIED Page 24 of 49 - - 1 P-1 Line #46 1 1 Volume 2 - 190 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP BLOCK 2 for SLQ-32 (V)7 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 16.509 4 / 21.500 Prior Years 1 / 4.991 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.991 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 3 / 16.509 4 / 21.500 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 4 Out 1 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 4 1 1 Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLK2 SHORE SITE UNITS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 7 / 7.827 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 7.827 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 25 of 49 P-1 Line #46 Volume 2 - 191 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLK2 SHORE SITE UNITS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 7 / 7.827 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost / - - / - 7 / 7.827 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Out 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Method of Implementation: SHIPALT/AIT:: Installation Name: BLK2 GFE FOR BLK3 OEM Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.858 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.858 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.858 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 26 of 49 P-1 Line #46 1 / 0.858 Volume 2 - 192 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC059 - BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: BLK2 GFE FOR BLK3 OEM Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Method of Implementation (Organic): BLOCK 2 Uneconomical to Repair - Not Installed Installation Quantity: 10 Method of Implementation (Organic): BLK 2 ROTATABLE POOL - Not Installed Installation Quantity: 3 Method of Implementation (Organic): MK6 MODX CPS/CDS for SLQ-32(V)6 - Not Installed Installation Quantity: 4 Method of Implementation (Organic): MK6 MODX CPS/CDS for SHORE SITE UNITS - Not Installed Installation Quantity: 8 Footnotes: (25) Increase in funding is due to the FY26 to FY27 procurement quantity increase from 2 in FY26 to 3 in FY27. The FY27 unit cost increase over FY26 reflects estimated pricing for procurement of SLQ-32(V)6 systems under a new contract. Installation cost decreases from FY26 to FY27 primarily due to the decrease from 7 units being installed in FY26 to 3 units in FY27 (quantity 3 for BLK 2 FMP for SLQ-32(V)6). The SEWIP Block 2 system is being installed as a back fit on a limited number of ships. The budget submission reflects that the procurement and installation schedules have changed due to several factors including the number of units procured in prior years, units procured in prior years that are unserviceable, changes in ship availabilities and schedules. Additionally, 10 SEWIP Block 2 systems procured in prior years are now beyond economical repair. This is due to parts removal to support spares requirements for systems installed on USN ships. (26) (27) (28) (29) (30) (31) MK6 MODX CPS/CDS for SLQ-32(V)6 funding procures quantity 4 in FY27. MK6 MODX CPS/CDS for Shore Site Units funding procures quantity 8 in FY27. Block 2 Refurbishment for rotatable pool assets funding increases above inflation from FY26 to FY27 due to the increased AN/SLQ-32(V)7 non-conjunctive installations that require additional assets. Funding for Block 2 Refurbishment for Partial systems supports the restoration of incomplete systems with missing parts consumed to maintain fleet operational availability. INCO Spares increases from FY26 to FY27 to match the requirement based on the Navy's Model Based Product Support Ready Based Spares Model. Award date slipped from March 2026 to June 2026 due to delay in contract negotiations. Delivery date has been adjusted accordingly. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 27 of 49 P-1 Line #46 Volume 2 - 193 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 23.020 38.897 58.757 0.000 58.757 20.778 36.348 56.247 48.536 - - - - - - - - - - 0.000 23.020 38.897 58.757 0.000 58.757 20.778 36.348 56.247 48.536 - - - - - - - - - - 0.000 23.020 38.897 58.757 0.000 58.757 20.778 36.348 56.247 48.536 Total 540.165 822.748 540.165 822.748 540.165 822.748 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AN/SLQ-32(V) Signal Processing Upgrade (previously the (V)6 VPX Upgrade Engineering Change Proposal (ECP)) provides significant capability and reliability enhancements that greatly increase the AN/ SLQ-32(V) operator's tactical situational awareness and system availability. In addition, modernization provides the back-end computing power necessary to counter emerging threats. It increases system emitter processing throughput, reduces false detections/classifications, increases system fault tolerance, simplifies system maintenance, and is a critical enabler of future artificial intelligence (AI) capability growth required to rapidly ID and classify emerging unknown threat emitters. Signal Processing Upgrade is also a pre-requisite for EW systems currently in development, such as LEED and SOEA. Notes: (1) The FY27 budget request of $58.757M supports procurement of 8 FMP ship units, 3 Non-FMP Shore Site Units, production support, installation of 6 (5 FMP Block 2 systems with V6 and 1 Non-FMP Shore Site for V6), efforts to address reliability, obsolescence and combat integration system issues that negatively impact system readiness including acceleration to AN/SLQ-32(V) Signal Processing Upgrade on Block 2 units, and installation planning for installs in FY28 and FY29. (2) Production Support provides government oversight for the production of hardware and hardware components. It is composed primarily of Warfare Center support of production related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), and Professional Support Services (PSS). It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (3) For FMP AN/SLQ-32(V) Signal Processing Upgrades, the production lead is 18 months. This includes system integration prior to delivery to the ship for installation. (4) AN/SLQ-32(V) Signal Processing Upgrade installations will be phased over three years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Installation funding for AP and planning yard DSA is required in both of the 2 years prior to the year of installation to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Total cost for installations shows both current year installation funding for the quantity of installations in addition to AP and planning yard DSA for current year and/or following year installs. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 28 of 49 P-1 Line #46 Volume 2 - 194 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade MDAP/MAIS Code: Related RDT&E PEs: 0604757N Models of Systems Affected: TC059 SURFACE EW Modification Type: SHIPALT/AIT IMPROVEMENTS BLOCK 2 ELECTRONIC SUPPORT (ES) SYSTEM Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: TC059 - AN/SLQ-32(V) Signal Processing Upgrade B Kits Recurring 1.1.1) FMP SHIP UNITS Below Deck Upgrades (VME to Sig Proc Upgrades) - NonOrganic (32) 1.1.2) NON-FMP SHORE SITE UNITS Below Deck Upgrades (VME to Sig Proc Upgrades) - NonOrganic - / - 5 / 16.500 - / - 1 / 3.300 10 / 33.660 - / - 8 / 33.187 - / - 8 / 33.187 1 / 4.781 3 / 12.445 - / - 3 / 12.445 - 4 / 18.648 / - - 11 / 48.369 / - - 8 / 36.793 / - - 77 / 361.218 / - - 124 / 553.156 / - 4 / 15.745 (33) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 0.000 - Subtotal: TC059 - AN/SLQ-32(V) Signal Processing Upgrade - / 0.000 - / 19.800 - / - 6 / 19.800 / 19.800 - / 33.660 - 10 / 33.660 / 33.660 - / 45.632 - / - - 11 / 45.632 - / - 11 / 45.632 / 45.632 - / - - - - / 45.632 - / 4.781 / 45.632 - / 4.781 / 18.648 - 1 / 4.781 4 / 18.648 / 18.648 - / 48.369 - / 48.369 - / 36.793 - 11 / 48.369 8 / 36.793 / 36.793 - / 361.218 - 77 / 361.218 / 361.218 - / 568.901 - 128 / 568.901 / 568.901 - Support (All Modification Items) / - - / 1.851 - / 1.944 - / 2.692 - / - - / 2.692 - / 2.746 - / 2.801 - / 2.857 - / 2.914 - / 13.729 - / 31.534 - / 0.000 - / 1.851 - / 1.944 - / 2.692 - / - - / 2.692 - / 2.746 - / 2.801 - / 2.857 - / 2.914 - / 13.729 - / 31.534 Modification Item 1 of 1: TC059 - AN/SLQ-32(V) Signal Processing Upgrade - / 0.000 - / 1.369 - / 3.293 - / 10.433 Subtotal: Installation - / 0.000 - / 1.369 - / 3.293 - / 10.433 2.1) Production Support - (34) Subtotal: Support Installation - / 0.000 - / 10.433 - / 13.251 - / 14.899 - / 5.021 - / 8.829 - / 165.218 - / 222.313 / - - / 10.433 - / 13.251 - / 14.899 - / 5.021 - / 8.829 - / 165.218 - / 222.313 - Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 0.000 23.020 38.897 58.757 0.000 UNCLASSIFIED Page 29 of 49 58.757 20.778 36.348 P-1 Line #46 56.247 48.536 540.165 822.748 Volume 2 - 195 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade MDAP/MAIS Code: Modification Item 1 of 1: TC059 - AN/SLQ-32(V) Signal Processing Upgrade Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD (35) Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jun 2026 Jun 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Dec 2027 Dec 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Sep 2032 Installation Information Method of Implementation: SHIP/ALT:: Installation Name: FMP SHIP UNITS Below Deck Upgrades (VME to Sig Proc Upgrades) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - - / - - FY 2025 - / - 0 / 1.369 / - 0 / 0.500 - / - 5 / 5.945 - 0 / 0.000 5 / 5.945 - / - - / - - / - - / - 0 / 0.000 5 / 7.814 FY 2026 - / - - / - 0 / 2.793 0 / 1.020 0 / 0.000 0 / 1.020 10 / 12.128 - / - - / - - / - 0 / 0.000 10 / 15.941 FY 2027 - / - - / - - / - 0 / 2.279 0 / 0.000 0 / 2.279 0 / 0.832 8 / 9.897 - / - - / - 0 / 0.000 8 / 13.008 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.291 0 / 0.106 1 / 1.262 - / - 0 / 0.000 1 / 1.659 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 1.186 0 / 0.433 4 / 5.148 0 / 0.000 4 / 6.767 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 3.326 0 / 1.214 11 / 14.441 11 / 18.981 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.467 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 0 / 1.369 0 / 3.293 / - - 5 / 9.244 / - 0 / 0.000 5 / 9.244 10 / 13.251 8 / 11.189 1 / 5.021 / - - / - 8 / 11.613 8 / 14.080 / - 77 / 139.164 77 / 139.164 4 / 8.829 96 / 165.218 124 / 217.414 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 3 1 1 2 2 3 3 2 2 2 2 1 - - - 1 1 1 1 96 124 Out - - - - - - - - - - 2 1 1 1 2 2 3 3 - - - 109 124 LI 2312 - AN/SLQ-32 Navy - UNCLASSIFIED Page 30 of 49 - - - P-1 Line #46 - - - - Volume 2 - 196 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / TC059 - AN/SLQ-32(V) Signal Processing Upgrade MDAP/MAIS Code: Modification Item 1 of 1: TC059 - AN/SLQ-32(V) Signal Processing Upgrade Installation Information Method of Implementation: SHIP/ALT:: Installation Name: NON-FMP SHORE SITE UNITS Below Deck Upgrades (VME to Sig Proc Upgrades Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - - / - - / - - / - - / - - / - - FY 2025 - / - - / - - / - 1 / 1.189 0 / 0.000 1 / 1.189 - / - - / - - / - - / - 0 / 0.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - - / - - / - - / - - / - 3 / 3.710 - / - - / - 0 / 0.000 3 / 3.710 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 1 / 1.189 1 / 1.189 - / - 3 / 3.710 - / - - / - 0 / 0.000 Installation Cost / - - / - 0 / 0.000 / - - / - 1 / 1.189 / - - / - 4 / 4.899 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 1 - - - - - - - 1 1 1 - - - - - - - - - 4 Out - - - - - - - - - - - - - - - - 1 1 - - - - - - - - 4 - 1 - 1 Footnotes: (32) The FY26 to FY27 increase in funding to FMP Ship Units for Below Deck Upgrades (VME to Signal Processing Upgrade) is due to the increase in unit cost from estimated pricing for procurement of Signal Processing Upgrade units under a new contract. Increase in installation cost from FY26 to FY27 supports Design Services Allocation requirements for future FMP installs. The Signal Processing Upgrade units are being installed as a back fit based on ship availabilities and schedules in FY27 and FY28. (33) FY26 to FY27 increase in funding to Non-FMP Shore Site Units for Below Deck Upgrades (VME to Signal Processing Upgrades) increase in quantity from 0 in FY26 to 3 in FY27. Design Allocation Services are not required for Non-FMP Shore Site Units since they will be installed at test and training locations. (34) (35) Production support increases from FY26 to FY27 for additional government oversight required for the production of hardware and hardware components, and related software and hardware issues. FY25 Award date slipped from Aug 2025 to Jun 2026, and the FY26 award date from Mar 2026 to June 2026 due to delay in contract negotiations, Delivery dates have been adjusted accordingly. The FY25 units will be procured with the FY26 units. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 31 of 49 P-1 Line #46 Volume 2 - 197 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Prior Years 971.405 971.405 971.405 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 84.770 84.770 84.770 165.894 165.894 165.894 204.211 - 0.000 - 204.211 - 0.000 - 204.211 0.000 204.211 204.211 204.211 295.438 295.438 295.438 295.926 295.926 295.926 310.105 To FY 2031 Complete 357.604 310.105 357.604 310.105 357.604 Total 4,770.167 7,455.520 4,770.167 7,455.520 4,770.167 7,455.520 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Block 3 provides an Electronic Attack (EA) capability improvement required for the AN/SLQ-32(V) system to keep pace with the evolving threat. The program builds on the EW Electronic Support (ES) capability delivered by Blocks 1 and 2 and will provide a common EA capability to surface ships (CVN, DDG, and LHD). The program works in concert with the Scaled Onboard Electronic Attack (SOEA) and both are needed for effective Electronic Attack (EA) at the strike group level. Notes: (1) The FY27 budget request of $204.212M supports production support, procurement of one (1) Block 3 system, Tech Refresh, ECPs, SLQ-32 (V)7 Integration, Chilled Water Conversion ECP, installation of 1 FMP unit, and Design Services Allocation for the installation of units in future years. (2) Production Support provides government oversight for the production of hardware and hardware components. It is composed primarily of Warfare Center support of production related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), and Professional Support Services (PSS). It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (3) Spares requirements have been modeled based on the Navy's Model Based Product Support Ready Based Spares Model and vary with the number of units being procured as well as the maturity of the system. Spares requirements are based on the production maturity of the system as well as lessons learned from early LRIP Lowest Repairable Unit (LRU) failure rates for similar systems (including SEWIP Block 1B3 and 2). (4) SEWIP Block 3 Tech Refresh includes the procurement and integration of EA subsystem Diminishing Manufacturing Sources and Material Shortages (DMSMS) components. (5) SEWIP Block 3 Engineering Change Proposal (ECP) supports anticipated changes during production to address known reliability and other issues. ECP efforts include software and firmware updates, EA subsystem Diminishing Manufacturing Sources and Material Shortages (DMSMS) monitoring and mitigation, and Cooling Equipment Unit (CEU) and Prime Power Equipment (PPE) modifications. (6) The Chilled Water Conversion ECP will modify SEWIP Block 3 hardware components currently using R134a refrigerant for cooling to be cooled with chilled water. The Chilled Water Conversion ECP will modify designs of all antennas and the Electronic Attack (EA) Rack to support chilled water cooling. The design modifications include new cold plates, manifolds, and distribution lines. The modification reduces LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 32 of 49 P-1 Line #46 Volume 2 - 198 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: hardware complexity by eliminating hardware components, reducing installation complexity and duration, reducing sailor maintenance, and increasing sailor safety. Ships that have already received the SEWIP Block 3 configuration with R134a cooling will not be backfit with the Chilled Water ECP; there are currently 34 hulls planned to receive the chilled water ECP. (7) As the SEWIP Block 3 population increases, the number of systems required to be integrated per year increases to support system delivery to the shipyard 30 days prior to the start of each availability (A-30). These include the integration and testing of the SEWIP Blocks 2 and 3 into a SLQ-32(V)7 system. This is a complex effort that requires housing the arrays, electronic processing racks, and cooling equipment hardware in land-based integration sponsons to conduct testing of the system. (8) For FMP Block 3 systems, the production lead time is 30 months, 24 months for the production and 6 months for systems integration prior to delivery to the ship for installation. The anticipated delivery rate is 1 SEWIP Block 3 system every 5 months. The systems integrator, NSWC Crane, conducts integration, testing, and preparation for shipment. The 6-month integration period is for integration and testing of the SEWIP Blocks 2, and 3 into a SLQ-32(V)7 system, and preparation for shipment and delivery to the shipyard 30 days prior to the start of the availability (A-30). (9) SEWIP Block 3 installation hardware unit price (1.1.1) includes the procurement of the four (4) quad plates per shipset and other ancillary hardware equipment including the quad plate shipping container fabrication, Radar Absorbent Material (RAM) structure assembly, supply manifold assembly, Radio Frequency (RF) cables, quad plate piping fabrication, and installation. (10) The SEWIP Block 3 installation is significantly more complex than the SEWIP Block 2 installation. The SEWIP Block 3 installation includes the fabrication and outfitting of steel sponson structures to house the arrays, electronic processing racks, and cooling equipment hardware. The installation also includes the cost for internal space reconfiguration to fit the four-bay prime power equipment. (11) SEWIP installations are phased over three years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Installation funding for AP and planning yard DSA is required in both of the 2 years prior to the year of installation to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Total cost for installations shows both current year installation funding for the quantity of installations in addition to AP and planning yard DSA for current year and/or following year installs. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 33 of 49 P-1 Line #46 Volume 2 - 199 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Models of Systems Affected: TC060 SURFACE EW IMPROVEMENTS BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Prior Years Related RDT&E PEs: 0604757N Modification Type: SHIPALT/AIT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM B Kits Recurring 1.1.1) FMP BLOCK 3 (SMALL RCS) for SLQ-32(V)7 NonOrganic (36) 10 / 554.723 1.1.2) FMP BLOCK 3 (Quad Configuration) for SLQ-32(V)7 - NonOrganic 1.1.3) CVN/LHD Chiller Procurement - NonOrganic - / - - / - 1 / 95.432 - / - 1 / 95.432 2 / 184.530 2 / 188.220 2 / 191.984 2 / 195.824 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 745.728 9 / 745.728 - 7 / 103.671 7 / 103.671 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 32.970 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.5) Installation and Check Out (INCO) Spares - 3 / 50.555 1 / 9.100 1 / 9.468 - / - 1 / 9.468 (37) Subtotal: Recurring / 638.248 - Subtotal: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Subtotal: Procurement, All Modification Items / 9.100 - 14 / 638.248 2 / 18.564 / 18.564 - 1 / 9.100 / 638.248 - 39 / 3,408.120 - 1.1.4) NON-FMP BLK3 SHORE SITE UNITS NonOrganic Organic 20 / 1,997.407 / 9.100 - / 18.564 / 10.834 - / 11.051 - / 104.900 - / - 2 / 104.900 - / - / 104.900 - / - / 11.744 - / - - 2 / 18.564 - / 104.900 - 2 / 19.314 / 104.900 - / 203.844 - 2 / 104.900 2 / 21.650 / 203.844 - / 209.870 - 4 / 203.844 2 / 24.791 / 209.870 - / 216.775 - 4 / 209.870 2 / 25.287 / 216.775 / 221.111 - 4 / 216.775 - - 4 / 221.111 / 221.111 - / - 1 / 32.970 36 / 527.995 / 3,374.801 - 51 / 706.724 / 4,997.213 - 72 / 3,374.801 107 / 4,997.213 / 3,374.801 - / 4,997.213 - Support (All Modification Items) 2.1) Production Support 2.2) Tech Refresh - (38) - (39) 2.3) Engineering Change Proposals (ECPs) - (40) 2.4) SLQ-32(V)7 Integration 2.5) Chilled Water Conversion ECP / 70.317 (41) 2.6) LHD/CVN Electronic Attack (EA) Subsystem Design Change Subtotal: Support - - / 8.298 / 52.383 - / 6.669 / 12.139 - / - - / - - / - - / - / 17.308 - / - - / 6.037 / 10.902 - - / 8.637 / 38.543 - / - / 11.744 / 191.309 / 261.952 - / 316.990 / 26.286 - / 164.235 / 137.874 - / - - / - - / - - / - - / 59.041 - / 50.484 - / 42.126 - / 41.640 - / 42.473 - / 463.614 / 0.000 - / 40.270 - / 41.110 - / 43.930 - / 51.690 - / 94.020 - / 931.752 - / 1,505.811 / - - / 40.270 - / 41.110 - / 43.930 - / 51.690 - / 94.020 - / 931.752 - / 1,505.811 / 148.306 - / 29.642 - / 75.170 - / 59.041 Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM - / 184.851 - / 46.028 - / 72.160 - / 40.270 Subtotal: Installation - / 184.851 - / 46.028 - / 72.160 - / 40.270 - / 19.993 - - / - / 9.246 / 10.522 - / 1.237 - / - - / - - / - - / - - / - - / - - / - - - - / 9.550 - - / - / 9.363 / 13.005 / 8.940 - - - - - / 8.749 - / 7.079 / 37.502 / 19.993 - / 12.750 - - / - - / 6.940 / 12.839 - / 12.500 - - / 8.749 - / 6.804 / 12.587 / - / 12.255 - - / - - / 6.671 / 12.339 - / 12.015 - - - - / 6.540 / 12.096 / 6.540 - - - / 12.015 - - - - - / 192.359 / 70.295 / 17.308 / 952.496 Installation LI 2312 - AN/SLQ-32 Navy - UNCLASSIFIED Page 34 of 49 P-1 Line #46 Volume 2 - 200 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TC060 SURFACE EW IMPROVEMENTS BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Prior Years Financial Plan Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Related RDT&E PEs: 0604757N Modification Type: SHIPALT/AIT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 971.405 84.770 165.894 204.211 0.000 UNCLASSIFIED Page 35 of 49 204.211 295.438 295.926 P-1 Line #46 310.105 357.604 4,770.167 7,455.520 Volume 2 - 201 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Manufacturer Information Manufacturer Name: NORTHROP GRUMMAN Manufacturer Location: BALTIMORE, MD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 30 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Sep 2029 Sep 2030 Sep 2031 Sep 2032 Sep 2033 Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP BLOCK 3 (SMALL RCS) for SLQ-32(V)7 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 4 / 180.173 1 / 46.028 2 / 72.160 1 / 40.270 0 / 0.000 1 / 40.270 1 / 39.200 1 / 35.280 10 / 413.111 Prior Years - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 0 / 1.910 0 / 4.750 1 / 36.020 - / - 0 / 0.000 1 / 42.680 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 3.900 0 / 9.700 2 / 73.080 0 / 0.000 2 / 86.680 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 3.980 0 / 9.900 2 / 74.610 2 / 88.490 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.990 0 / 6.980 2 / 80.950 2 / 89.920 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 4.060 2 / 86.300 2 / 90.360 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 236.634 20 / 236.634 2 / 94.020 26 / 478.494 39 / 1,047.875 Total 4 / 180.173 1 / 46.028 2 / 72.160 1 / 40.270 0 / 0.000 1 / 40.270 1 / 41.110 1 / 43.930 1 / 51.690 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - - - 1 1 1 - - 1 - - - - - - 1 - 1 - - 1 - - - 1 - 1 - 26 39 Out 1 - - - 1 - - 1 - - - - 1 - 1 - 28 39 LI 2312 - AN/SLQ-32 Navy - - 1 1 UNCLASSIFIED Page 36 of 49 1 - - P-1 Line #46 1 - - - - 2 Volume 2 - 202 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Installation Information Method of Implementation: [none specified]:: Installation Name: FMP BLOCK 3 (Quad Configuration) for SLQ-32(V)7 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 408.195 9 / 408.195 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 408.195 9 / 408.195 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 9 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 9 Method of Implementation: SHIPALT/AIT:: Installation Name: CVN/LHD Chiller Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 37 of 49 P-1 Line #46 Volume 2 - 203 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: CVN/LHD Chiller Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 45.063 7 / 45.063 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 45.063 7 / 45.063 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 7 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 7 Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLK3 SHORE SITE UNITS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 4.678 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 4.678 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 4.678 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 38 of 49 P-1 Line #46 1 / 4.678 Volume 2 - 204 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: TC060 - BLOCK 3 ELECTRONIC ATTACK (EA) SYSTEM Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: NON-FMP BLK3 SHORE SITE UNITS Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Method of Implementation (Organic): Installation and Check Out (INCO) Spares - Not Installed Installation Quantity: 51 Footnotes: (36) SEWIP Block 3 procurement quantities increase from 0 in FY26 to 1 in FY27 to align with ship availabilities. The SEWIP Block 3 systems are being installed as a backfit based on ship availabilities and schedules. Installation cost decreases from FY26 to FY27 primarily due to the reduction of installations from 2 in FY26 to 1 in FY27. (37) (38) Spares requirements are based on the Navy's Model Based Product Support Ready Based Spares Model. The FY27 Production Support increase provides government oversight for the production of hardware and hardware components. Production Support is not quantity dependent. It is composed primarily of Warfare Center support of production related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), and Professional Support Services (PSS). It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (39) (40) Tech Refresh increases from FY26 to FY27 due to increased pricing of components required to keep pace with Diminishing Manufacturing Sources and Material Shortages (DMSMS). Engineering Change Proposals (ECP) increases from FY26 to FY27 due to increased resources required to support software and firmware updates, and EA subsystem DMSMS monitoring and mitigation as increased systems are fielded in the fleet. (41) Chilled Water Conversion ECP decreases from FY26 to FY27 due to majority of hardware procurement and design modifications efforts being performed in FY26 with remaining efforts pertaining to software and validation of system performance improvements being performed in FY27. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 39 of 49 P-1 Line #46 Volume 2 - 205 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 0.000 0.000 18.054 7.167 0.000 7.167 30.723 16.997 18.254 25.432 31.103 - - - - - - - - - - - 0.000 0.000 18.054 7.167 0.000 7.167 30.723 16.997 18.254 25.432 31.103 - - - - - - - - - - - 0.000 0.000 18.054 7.167 0.000 7.167 30.723 16.997 18.254 25.432 31.103 Total 147.730 147.730 147.730 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Electronic Attack Rack Engineering Change Proposal (ECP) provides hardware and reliability improvements which focus on updating the system producibility, performance, and availability. Notes: (1) The FY27 budget request of $7.167M supports procurement of 1 FMP ship unit and Design Services Allocation funding to support the FY28 installation. (2) The production lead time for the FMP Block 3 Electronic Attack Rack kits is 18 months. (3) Installations are phased over three years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Installation funding for AP and planning yard DSA is required in both of the two years prior to the year of installation to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Total cost for installations shows both current year installation funding for the quantity of installations in addition to AP and planning yard DSA for current year and/or following year installs. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 40 of 49 P-1 Line #46 Volume 2 - 206 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) Prior Years Financial Plan Modification Number / Title: 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) Related RDT&E PEs: 0604757N Modification Type: SHIPALT/AIT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) B Kits Recurring 1.1.1) NON-FMP SHORE SITE UNITS EA Rack Tech - / - - / - 1 / 4.168 - / - - / - - - / - - / - 3 / 12.504 1 / 4.251 - / - 1 / 4.251 / 0.000 - / - / - - / - - / 0.000 - / - Modification Item 1 of 1: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) - / 0.000 Subtotal: Installation - / 0.000 Refresh Kit - NonOrganic (42) 1.1.2) FMP SHIP UNITS EA Rack Tech Refresh Kit NonOrganic (43) Subtotal: Recurring - Subtotal: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) Subtotal: Procurement, All Modification Items - / 16.672 - - 4 / 16.672 - / - / 4.251 - / - 1 / 4.251 - / - - / - - / 4.251 / 0.000 - / 2.916 / - - / 2.916 / 16.672 - / 4.251 - - / - - 1 / 4.336 / 4.251 - 1 / 4.251 / 4.336 / - - 2 / 8.846 - 1 / 4.336 / 8.846 / - - 2 / 9.022 - 2 / 8.846 / 9.022 - 2 / 9.022 / - - / - 1 / 4.168 2 / 9.202 - / - 11 / 48.161 / 9.202 / 4.336 - / 8.846 - / 9.022 - / 26.387 - / 8.151 - / 9.232 - / 16.230 - / 26.387 - / 8.151 - / 9.232 - / 16.230 - - / 0.000 - 2 / 9.202 - / 9.202 / - - / 52.329 12 / 52.329 / 0.000 - / 52.329 - / 31.103 - / 95.401 - / 31.103 - / 95.401 - Installation - / 0.000 - / 1.382 - / 2.916 / - - / 1.382 - / 2.916 - Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 0.000 0.000 18.054 7.167 0.000 UNCLASSIFIED Page 41 of 49 7.167 30.723 16.997 P-1 Line #46 18.254 25.432 31.103 147.730 Volume 2 - 207 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) MDAP/MAIS Code: Modification Item 1 of 1: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD (44) Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2025 Aug 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Feb 2028 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Sep 2032 Installation Information Method of Implementation: SHIP/ALT:: Installation Name: NON-FMP SHORE SITE UNITS EA Rack Tech Refresh Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - 1 / 5.977 - / - - / - - / - 0 / 0.000 1 / 5.977 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 1 / 5.977 - / - - / - - / - 0 / 0.000 Installation Cost 1 / 5.977 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 1 - - - - - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2312 - AN/SLQ-32 Navy - - 1 UNCLASSIFIED Page 42 of 49 P-1 Line #46 Volume 2 - 208 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) MDAP/MAIS Code: Modification Item 1 of 1: TC060 - Block 3 Electronic Attack Rack Engineering Change Proposal (ECP) Installation Information Method of Implementation: SHIP/ALT:: Installation Name: FMP SHIP UNITS EA Rack Tech Refresh Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 0 / 1.382 0 / 2.565 0 / 0.000 0 / 2.565 3 / 19.180 - / - - / - - / - 0 / 0.000 3 / 23.127 FY 2027 - / - - / - - / - 0 / 0.351 0 / 0.000 0 / 0.351 0 / 0.872 1 / 6.529 - / - - / - 0 / 0.000 1 / 7.752 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.358 0 / 0.891 1 / 6.667 - / - 0 / 0.000 1 / 7.916 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.731 0 / 1.819 2 / 13.613 0 / 0.000 2 / 16.163 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.746 0 / 1.856 2 / 13.898 2 / 16.500 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.761 2 / 17.205 2 / 17.966 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 0 / 1.382 Installation Cost 0 / 2.916 0 / 0.000 0 / 2.916 3 / 20.410 1 / 8.151 1 / 9.232 / - - 2 / 16.230 / - 4 / 31.103 - / - 11 / 89.424 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 1 1 1 - 1 - - - 1 - - - 2 - - 4 11 Out - - - - - - - - - - - - - - - 1 - 1 - - - - - 7 11 - - - 1 1 - Footnotes: (42) (43) The FY27 funding decrease for Non-FMP Ship Units EA Rack Tech Refresh Kits is due to a decrease of quantity 1 in FY26 to quantity 0 in FY27. The FY27 funding decrease for FMP Ship Units EA Rack Tech Refresh Kits is due to a decrease of quantity 3 in FY26 to quantity 1 in FY27. Increase in installation cost from FY26 to FY27 supports Design Services Allocation requirements for future installs. (44) FY25 award date slipped from Mar 2026 to Aug 2026 based on late delivery of prototype hardware. Delivery date has been adujusted accordingly. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 43 of 49 P-1 Line #46 Volume 2 - 209 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 0.000 0.000 44.552 84.258 95.708 - - - 0.000 0.000 44.552 - - - 0.000 0.000 44.552 128.814 - 0.000 - 128.814 - 0.000 - 128.814 0.000 128.814 128.814 128.814 166.726 166.726 166.726 123.957 123.957 123.957 To FY 2031 Complete - - 84.258 95.708 - - 84.258 95.708 Total 2,233.091 2,877.106 2,233.091 2,877.106 2,233.091 2,877.106 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Scaled Onboard Electronic Attack (SOEA) is intended to provide an advanced Electronic Attack (EA) counter targeting capability to keep pace with the evolving Anti-Ship Missile Defense (ASMD) threat. It will assimilate into the SEWIP Family of shipboard Electronic Warfare systems. The program is designed to be scalable for Surface Combatants with Size, Weight, Power, and Cooling (SWaP-C) constraints that cannot support AN/ SLQ-32(V)7; however, it is not meant intended to replace AN/SLQ-32(V)7. SOEA will field incrementally as capability matures through a Middle Tier of Acquisition (MTA) Rapid Fielding (RF) strategy. Notes: (1) The FY27 budget request of $128.814M supports the transition of SOEA Phase 1 prototypes to production and includes procurement of 3 units for Fleet installation, 1 shore site, 4 INCO spares kit, production support, engineering change proposals, and Design Services Allocation for an FY29 installations. SOEA Phase, The increase in budget from FY26 to FY27 is due to the procurement quantity increase from 1 in FY26 to 4 (3 ship sets and 1 shore site) in FY27 for accelerated procurement and fielding of Scaled Onboard EA (SOEA) systems for additional system procurements across the FYDP to accelerate development, production, and fielding of SOEA in support of Fleet requirements. Since the FY26 budget request, one (1) shore site procurement has been added to support Environmental Qualification Testing (EQT) consistent with SOEA's Rapid Fielding Acquisition Strategy. (2) Production Support provides government oversight for the production of hardware and hardware components. It is composed primarily of Warfare Center support of production related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), and Professional Support Services (PSS). It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (3) Spares include Installation and Checkout (INCO) materials required for system installation, as well as initial outfitting and replenishment to ensure readiness and availability. Early investment is critical to support accelerated fielding timelines and mitigate supply chain and obsolescence risk under the MTA Rapid Fielding (RF) construct. (4) SOEA Engineering Change Proposal (ECP) funding supports anticipated changes during production to incorporate improvements. The ECP funding reflects expected engineering changes necessary to integrate evolving requirements, address fleet-driven feedback, and support capability maturation across multiple delivery increments. Annual fluctuations correspond to planned production quantities and the timing of key technical insertions. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 44 of 49 P-1 Line #46 Volume 2 - 210 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: (5) For FMP SOEA systems, the production lead is 15 months; however, the initial FY26 procurement includes an 18-month production lead time. This includes system integration prior to delivery to the ship for installation. Procurement is targeted for Q3 each fiscal year to ensure all Technical Data Package (TDP) updates are incorporated, enabling the delivery of the most current and fully integrated systems under the MTA RF framework. (6) SOEA installations will be phased over two years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Installation funding for AP and planning yard DSA is required in both of the 2 years prior to the year of installation to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Total cost for installations shows both current year installation funding for the quantity of installations in addition to AP and planning yard DSA for current year and/or following year installs. (7) Since the FY26 budget request, SOEA non-FMP installation has been added for installation of the shore site system. The non-FMP installation reflects site-specific integration efforts outside of the standard FMP construct, including infrastructure readiness, interface configuration, and tailored site activation requirements. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 45 of 49 P-1 Line #46 Volume 2 - 211 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: Related RDT&E PEs: 0604757N Models of Systems Affected: TC070 Scaled Onboard Modification Type: SHIPALT/AIT Electronic Attack Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: TC070 - Scaled Onboard Electronic Attack (SOEA) B Kits Recurring - / - - / - - / - - / - - - / - - / - / 0.000 - / - / - - / - / 0.000 - / - - / - - / - - / 9.783 - / - - / - - / 4.951 - / 0.000 - / - Modification Item 1 of 1: TC070 - Scaled Onboard Electronic Attack (SOEA) - / 0.000 Subtotal: Installation - / 0.000 1.1.1) FMP SOEA - NonOrganic (45) 1.1.2) NON-FMP SOEA SHORE SITE UNITS NonOrganic (46) 1.1.3) Installation and Check Out (INCO) Spares Organic (47) Subtotal: Recurring - Subtotal: TC070 - Scaled Onboard Electronic Attack (SOEA) Subtotal: Procurement, All Modification Items - 1 / 24.715 3 / 72.351 - / - 3 / 72.351 / - 1 / 24.117 - / - 1 / 24.117 1 / 3.547 4 / 12.644 - / - 4 / 12.644 / 28.262 - / 28.262 - / 109.112 - / - 8 / 109.112 - / - / 109.112 - / - - / 9.989 - / - - / 9.989 - / 5.514 - / - - / 5.514 / 15.503 - / - - 2 / 28.262 - / 109.112 - 8 / 109.112 / 109.112 - 5 / 118.595 - 3 / 72.741 / - - 5 / 15.230 / 133.825 - / - - 3 / 9.204 / 81.945 - 10 / 133.825 - 1 / 27.817 - / 10.911 - / - - 1 / 3.115 / 30.932 - 6 / 81.945 / 133.825 2 / 48.262 - / 12.078 - / - - 2 / 6.250 / 54.512 - 2 / 30.932 / 81.945 62 / 1,431.208 77 / 1,795.689 / - 1 / 24.117 62 / 197.656 / 1,628.864 - 78 / 247.646 / 2,067.452 - 4 / 54.512 124 / 1,628.864 156 / 2,067.452 / 30.932 - / 12.285 - / 54.512 / 1,628.864 - / 2,067.452 - Support (All Modification Items) 2.1) Production Support (48) 2.2) Engineering Change Proposals (ECPs) (49) Subtotal: Support / 14.734 - - - - / 5.581 - / 5.604 - / 5.721 / 12.577 - / 88.039 - / 155.662 / 5.842 - - / 126.828 - / 160.041 / 15.503 - / 16.492 - / 17.682 - / 18.006 - / 18.419 - / 214.867 - / 315.703 Installation - / 0.000 - / 1.556 - / 4.199 / - - / 1.556 - / 4.199 - / 0.000 - / 4.199 - / 16.409 - / 24.330 - / 35.320 - / 22.777 - / 389.360 - / 493.951 / - - / 4.199 - / 16.409 - / 24.330 - / 35.320 - / 22.777 - / 389.360 - / 493.951 - Total Total Cost (Procurement + Support + Installation) LI 2312 - AN/SLQ-32 Navy 0.000 0.000 44.552 128.814 0.000 UNCLASSIFIED Page 46 of 49 128.814 166.726 123.957 P-1 Line #46 84.258 95.708 2,233.091 2,877.106 Volume 2 - 212 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: Modification Item 1 of 1: TC070 - Scaled Onboard Electronic Attack (SOEA) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD (50) Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 15 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2025 Sep 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Delivery Dates Jun 2028 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Sep 2032 Installation Information Method of Implementation: SHIPALT/AIT:: Installation Name: FMP SOEA Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 0 / 1.556 0 / 0.345 0 / 0.000 0 / 0.345 1 / 6.381 - / - - / - - / - 0 / 0.000 1 / 8.282 FY 2027 - / - - / - - / - 0 / 3.854 0 / 0.000 0 / 3.854 0 / 1.055 3 / 19.529 - / - - / - 0 / 0.000 3 / 24.438 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 5.214 0 / 1.794 5 / 33.199 - / - 0 / 0.000 5 / 40.207 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 3.007 0 / 1.098 3 / 20.318 0 / 0.000 3 / 24.423 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.023 0 / 0.373 1 / 6.908 1 / 8.304 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.086 2 / 14.854 2 / 16.940 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - / - 62 / 367.598 62 / 367.598 Total - / - - / - 0 / 1.556 3 / 22.777 65 / 389.360 77 / 490.192 Installation Cost 0 / 4.199 0 / 0.000 0 / 4.199 1 / 12.650 3 / 24.330 - 5 / 35.320 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - 1 - 3 - - - 3 2 - - 3 - - - 65 77 Out - - - - - - - - - - - - - - - 1 - - 65 77 LI 2312 - AN/SLQ-32 Navy - - UNCLASSIFIED Page 47 of 49 - 1 - 3 1 - P-1 Line #46 - 3 3 Volume 2 - 213 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2312 / AN/SLQ-32 Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: Modification Item 1 of 1: TC070 - Scaled Onboard Electronic Attack (SOEA) Installation Information Method of Implementation: [none specified]:: Installation Name: NON-FMP SOEA SHORE SITE UNITS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 1 / 3.759 - / - - / - - / - 0 / 0.000 1 / 3.759 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 1 / 3.759 - / - - / - - / - 0 / 0.000 Installation Cost 1 / 3.759 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - 1 - - - - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - - 1 Method of Implementation (Organic): Installation and Check Out (INCO) Spares - Not Installed Installation Quantity: 78 Footnotes: (45) SOEA FMP funding increase is due to the increased procurement quantity of 1 in FY26 to 3 in FY27. Installation funding increase from FY26 to FY27 is due to an increase in DSA requirements associated with the 3 FY27 procurements which will be installed in FY29, and one (1) FY26 procurement which will be installed in FY28. (46) (47) (48) Non-FMP SOEA Shore Site Unit funding increases due to increased procurement quantities from 0 in FY26 to 1 in FY27. Installation and Check Out (INCO) Spares funding increases due to increased quantities from 1 in FY26 to 4 in FY27. Production support increases from FY26 to FY27 to support additional requirements for government oversight for the production of hardware and hardware components and related software and hardware issue. It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (49) Engineering Change Proposals (ECPs) funding increases from FY26 to FY27 due to additional resources required to support timing of key technical insertions and aligns with the increase in planned production quantities from 1 in FY26 to 4 in FY27. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 48 of 49 P-1 Line #46 Volume 2 - 214 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 4 P-1 Line Item Number / Title: 2312 / AN/SLQ-32 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / TC070 - Scaled Onboard Electronic Attack (SOEA) MDAP/MAIS Code: (50) SOEA production lead time has been updated from 12 to 15 months to reflect revised vendor estimates that account for additional system integration activities prior to delivery. The lead time for the first system is extended to 18 months due to first article integration, alignment of interfaces and initial production stand-up efforts The FY26 award date has shifted from Aug 2026 to Sep 2026 following completion of SOEA Phase 1 Prototype development (Q4FY26) ensuring the incorporation of the most current Technical Data Package (TDP) and system capability updates. LI 2312 - AN/SLQ-32 Navy UNCLASSIFIED Page 49 of 49 P-1 Line #46 Volume 2 - 215 === page 296 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 216 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 2,939.227 2,939.227 2,939.227 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 361.915 361.915 361.915 379.908 379.908 379.908 701.667 - 0.000 - 701.667 - 0.000 - 701.667 0.000 701.667 701.667 701.667 795.864 795.864 795.864 746.298 746.298 746.298 784.988 784.988 - To FY 2031 Complete 812.165 Continuing 812.165 Total - Continuing Continuing - Continuing - - 784.988 812.165 Continuing Continuing 26.265 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 46.372 - 53.738 - 53.738 51.661 41.751 28.269 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding for LI 3501 Cryptologic Carry-On Program (CCOP) has been realigned into LI 2360 Shipboard Information Warfare (IW) as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026. This effort consolidates the existing number of PEs/BLIs identified by BSOs and FMB to group technology projects to allow flexibility that would foster innovation and promote efficiency. PE/BLI consolidation meets the DoW Implementation Plan from the Commission on PPBE Interim Report. The Shipboard Information Warfare (IW) budget supports Ships Signal Exploitation Equipment (SSEE) Increment F, its variants, and Engineering Change Proposals (ECP) to maintain pace with modernization and signal threats; SSEE Modifications (SSEE MODS); Spectral; Integrated Communications and Data System (ICADS) Increments II and III; Real Time Spectrum Operations (RTSO); Horizon; Distributed Operations (DO); Advanced IW Antennas (AIWA); Cryptologic Carry-On-Program (CCOP); Snakehead, and Pacific Fleet Urgent Operational Need (PACFLT UON). The SSEE Family of Systems (FoS) includes variants which introduce scalability and configuration modularity through a permanently installed SSEE systems and Topside Infrastructure (Topside Antennas) supplemented with mission modules to meet platform mission requirements for Over the Horizon Targeting (OTH-T), and Counter-Command, Control, Computing, Communications, Cyber, Intelligence, Surveillance, Reconnaissance and Targeting (CC5ISRT). Mission module and ECP capabilities integrated into the SSEE Systems will enable maritime power projection by providing surface vessels the ability to disrupt, deny, degrade and defeat adversary (state and non-state) use of radio frequency spectrum, improving the Fleet's ability to communicate and operate therein. As part of the National Security Agency's (NSA) "Secure the Network" & "Secure the Enterprise" initiatives, NSA and C10F (10th Fleet) requires all systems, including U.S. Navy Surface Cryptologic Systems to migrate to NSAnet. The CCOP procures state-of-the-art, commercial off-the-shelf Signals Intelligence (SIGINT) equipment (hardware and software) in response to combatant commander requirements for a quick-reaction surface cryptologic carry-on capability. The equipment is procured in accordance with requirements detailed in the shipboard Information Warfare / Cryptologic System Operational Requirements Document and specific execution year fleet requirements. These requirements are defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG), in concert with Shipboard Signals Exploitation Space (SSES) programs (includes Ship's Signal Exploitation Equipment Family of Systems) to ensure synergy and seamless transition to permanently installed systems. The FSDWG meets to determine which signals of interest (SOI)s/Targets on the FSDWG list need to be addressed. Due to a continually changing threat environment, detailed requirements are dynamic and equipment procured varies each year by quantity and type. Equipment suites can be configured for many targets and tasking. Target specific subsystems can either operate as stand-alone within the cryptologic spaces or as an add-on to existing equipment. Hardware procurements includes: receivers, recorders, tactical computers and related peripherals, antennas, electronic-warfare support measures systems, precision geolocation equipment, advanced signal and search equipment including spectrum analyzers and associated portable special intelligence communications equipment. CCOP equipment is installed as an augment to cryptologic capabilities on surface units. There are approximately 120 cryptologic capable surface ships and shore sites in the current Navy inventory. Each of these are potential users of this LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 1 of 49 P-1 Line #47 Volume 2 - 217 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A carry-on equipment. The temporary installation of equipment is coordinated through fleet augmentation requests and installed by fleet electronic support personnel. A primary system in inventory is the Carry On Radio Spectrum Analysis & Intelligence Reporting (CORSAIR) system. Funds continue to procure CORSAIR core architecture system upgrades to provide additional affordable functionality to the combatant commands. Additional signal acquisition equipment to address specific combatant command requirements include such systems as PTEK, Digital Receiver Technology (DRT), Hostile forces Integrated Targeting Service (HITS), Maritime Toxic Pen (MTP), TURBULENTWAVE / TURBULENTSAIL / BLUESTREAM servers, RED FALCON, FIREFLY, NIBBLE TRACTOR, SHEARWATER, CARBON STORM, XML to JREAPC (X2J), TOXIC SMOKE, QUICKSHOT, SHOCKWAVE/WSTL, SHARKNADO, MONARCH/SCEPTRE and SALVAGE. [P5 / 1U029 Information Warfare (IW) Training Equipment]: Information Warfare (IW) training equipment provides operator, unit or multi-unit level training on Ships Signal Exploitation Equipment (SSEE) Increment F (V) 7/8. This equipment enhances initial skills, provides refresher training and increases proficiency of the operator on the system through the generation and replay of operational scenarios by software simulation versus hardware simulation. IW training equipment is updated based on new variants of SSEE systems. Additionally, this line supports the procurement of the Stallion (formerly known as Cryptologic On-Line Trainer) hardware for Shipboard IW team training. Stallion is a web-based/Service Oriented Architecture (SOA) scenario training system that emulates Navy Tactical Signal Intelligence (SIGINT)/Information Operations (IO) system functionality. Stallion is delivered turnkey to the Center for Information Warfare Training (CIWTs). [P5 / 1U014 SSEE Increment F (All Variants)]: The Ship Signal Exploitation Equipment (SSEE) Increment F (All Variants) program is an incremental acquisition, Commercial Off-The-Shelf/Government Off-TheShelf (COTS/GOTS) system designed as the cornerstone for maritime Information Warfare (IW) exploitation/Information Operations (IO)/non-kinetic functionality and tactical cryptologic capability across Navy surface combatant platforms. SSEE Increment F and its variants provides IW cryptologists with IO/non-kinetic capabilities and subsequent threat identification and analysis of Communications Intelligence as well as queuing of radio direction finding assets. Equipment includes receivers, Radio Frequency management systems, recorders, audio distribution systems, computers, antennas and ancillary hardware. The system is upgraded incrementally as improvements are developed with system design permitting rapid insertion of new and emerging Pre-Planned Product Improvement (P3I) to address the evolving threat and delivery through ECP. The system utilizes generic processor technology to counteract obsolescence issues with digital signal processing/field programmable gate array technologies and provide software receivers for ease of modification to deal with known and projected threat SOIs. Automated signal acquisition and integrated radio direction finding are incorporated into the SSEE Increment F(V)1/2 system. SSEE Inc F Engineering Change Proposals (ECP)/Obsolescence procures Commercial Off-The-Shelf/Non-Developmental Item (COTS/NDI) equipment to replace obsolete and end-of-life (EOL) equipment for the SSEE Increment F program (All Variants) as well as incorporates Pre-Planned Product Improvement (P3I) for the acquisition and localization of the latest Signals of Interest (SOI) and IO capabilities into the host systems. ECP's maintain and improve upon existing capability and relevance within a rapidly evolving threat environment. ECP equipment will also be used to supplement SSEE Family of Systems (FoS) to meet their respective scalable and modular capacities and meet platform mission requirements. [P5 / 1U019 SSEE Modifications]: Ship's Signal Exploitation Equipment (SSEE) Modifications is a classified Navy tactical signals intelligence frequency extension capability that integrates and interoperates with SSEE systems. This capability is broken into two major components: Paragon which provides simultaneous detection, collection, processing, Information Operations (IO) and display of communication intelligence data from hostile, high threat and adversary platforms in select frequency ranges that are not prosecuted or countered with SSEE Increment F and its variants; and the Graywing subsystem which is an advanced Electronic Warfare system that integrates with SSEE Increment F systems. It is a critical component of "Ballistic Missile Defense, Executive Committee, Anti-Submarine Warfare, Chief of Naval Operations, Executive Board IO Countermeasure Red Flash" (details held at a higher classification level). [P5 / 1U045 CCOP]: The Cryptologic Carry-On-Program (CCOP) procures state-of-the-art, commercial off-the-shelf Signals Intelligence (SIGINT) equipment (hardware and software) in response to combatant commander requirements for a quick-reaction surface cryptologic carry-on capability. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 2 of 49 P-1 Line #47 Volume 2 - 218 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Shipboard IW Exploit / 2,344.716 - / 12.653 - / 11.275 - / 11.268 - / 0.000 - / 11.268 P-3a 1 / SSEE Inc F ECPs (TBD) - / 319.230 - / 72.055 - / 71.242 - / 77.851 - / 0.000 - / 77.851 P-3a 2 / SSEE Mods ECP (TBD) - / 134.511 - / 50.997 - / 41.395 - / 24.972 - / 0.000 - / 24.972 P-3a 3 / Real Time Spectrum Operations - Own Force Monitoring Hardware (TBD) - / 20.431 - / 8.831 - / 9.918 - / 9.206 - / 0.000 - / 9.206 P-3a 4 / Horizon / Distributed Ops Hardware (TBD) - / 52.909 - / 25.654 - / 37.357 - / 51.460 - / 0.000 - / 51.460 P-3a 5 / Integrated Communications and Data System (ICADS) (TBD) - / 67.430 - / 31.996 - / 49.617 - / 71.175 - / 0.000 - / 71.175 P-3a 6 / SPECTRAL (TBD) - / 0.000 - / 159.729 - / 142.348 - / 176.657 - / 0.000 - / 176.657 P-3a 7 / Snakehead (TBD) - / 0.000 - / 0.000 - / 16.756 - / 39.108 - / 0.000 - / 39.108 P-3a 8 / Advanced IW Antennas (TBD) - / 0.000 - / 0.000 - / 0.000 - / 34.375 - / 0.000 - / 34.375 P-3a 9 / PACFLT UON (TBD) - / 0.000 - / 0.000 - / 0.000 - / 205.595 - / 0.000 - / 205.595 P-40 Total Gross/Weapon System Cost / 379.908 - / 701.667 - / 0.000 - - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 2,939.227 - / 361.915 - / 701.667 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Shipboard IW Exploit P-3a 1 / SSEE Inc F ECPs (TBD) P-5a, P-21 - / 18.399 - / 1.170 - / 0.000 - / 0.000 P-3a 2 / SSEE Mods ECP (TBD) - / 0.473 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / Real Time Spectrum Operations - Own Force Monitoring Hardware (TBD) - / 9.400 - / 9.550 - / 9.798 - / 10.005 P-3a 4 / Horizon / Distributed Ops Hardware (TBD) - / 41.228 - / 36.026 - / 29.194 - P-3a 5 / Integrated Communications and Data System (ICADS) (TBD) - / 38.088 - / 21.584 - / 17.230 - P-3a 6 / SPECTRAL (TBD) - / 258.121 - / 269.129 - / 288.360 - P-3a 7 / Snakehead (TBD) - / 51.011 - / 9.513 - / 0.000 P-3a 8 / Advanced IW Antennas (TBD) - / 60.982 - / 68.490 - P-3a 9 / PACFLT UON (TBD) - / 306.663 - / 319.097 P-40 Total Gross/Weapon System Cost - / 795.864 - / 746.298 - / - - / - - / - - / - - / - - / - - / 0.000 - / 559.947 - / 0.000 - / 252.348 Continuing Continuing / 54.147 Continuing Continuing / 17.642 Continuing Continuing / 275.051 Continuing Continuing - / 0.000 - - / 78.120 - / 85.656 Continuing - / 350.301 - / 357.599 Continuing Continuing - / 784.988 - / 812.165 Continuing Continuing / 0.000 / 116.388 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget reflects a net increase of +$321.759 million which is primarily attributed to SSEE, Spectral, Distributed Operations, and Pacific Fleet Urgent Operational Need (PACFLT UON). LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 3 of 49 P-1 Line #47 Volume 2 - 219 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The following procurement requirements and corresponding funding are aligned to the current fielding plan, which are continuously evolving in order to meet emerging threats in specific areas of responsibility (AORs): The FY 2027 budget will procure the following: P-5: (1) Information Warfare (IW) Training Equipment CCOP: (27) CCOP Systems & Subsystems: The FY 2027 procurement of CCOP systems will continue to satisfy signals exploitation capability gaps as determined by the CCOP Fleet Signals Development Working Group (FSDWG) and provide supplemental capability to host Signals Intelligence systems. Recommended procurements best suited to address identified gaps include: PTEK, Digital Receiver Technology (DRT), Hostile forces Integrated Targeting Service (HITS), Maritime Toxic Pen (MTP), TURBULENTWAVE / TURBULENTSAIL / BLUESTREAM servers, RED FALCON, FIREFLY, NIBBLE TRACTOR, SHEARWATER, CARBON STORM, XML to JREAP-C (X2J), TOXIC SMOKE, QUICKSHOT, SHOCKWAVE/WSTL, SHARKNADO, MONARCH/SCEPTRE and SALVAGE. P-3a: SSEE Inc F ECPs: (14) SSEE Tech Refresh; FY 2027 increase is attributed to the procurement of (2) additional systems, which aligns to current fielding plan SSEE Tech Refresh that combines VPX backfits, ECPs, and Next Generation Chassis and provide additional processing and storage. SSEE Mods ECP: (7) MODS VPX Backfit Kits Real Time Spectrum Operations (RTSO) Own Force Monitoring (OFM) Hardware: (10) RTSO OFM Systems; FY 2027 decrease is attributed to the procurement of (1) fewer systems, which aligns to current fielding plan. Horizon/Distributed Operations Hardware: (20) Horizon Systems; The classification for Horizon's quantities and locations has been reduced for unclassified review. FY 2027 decrease is attributed to the procurement of (3) fewer systems, which aligns to current fielding plan. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 4 of 49 P-1 Line #47 Volume 2 - 220 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (23) Distributed Operations Systems; The classification for DO's quantities and locations has been reduced for unclassified review. FY 2027 increase is attributed to procurement of (11) additional systems which aligns to current fielding plan. Integrated Communications and Data Systems (ICADS) Hardware: (5) ICADS Increment II Hardware; FY 2027 increase is attributed to the procurement of (2) additional ICADS Inc II systems, which aligns to current fielding plan. (464) ICADS Increment III Hardware; FY 2027 decrease is due to the procurement of (8) fewer systems in alignment with the ICADS Increment III Rapid Fielding program. ICADS Inc III Hardware unit cost increase from FY 2026 to FY 2027 of 22% reflects a correction in the cost estimate to reflect Technical Readiness Level (TRL) 7/8 requirements. The vendor's definitized cost now accurately captures the true cost per unit, reflecting the realities of the current supply chain. While this increase is significant, it prevents potentially far larger cost overruns later in the program. SPECTRAL: (0) Spectral Systems; FY 2027 quantities changed from 12 to 0 due to the Limited Production Decision (LPD). Favorable Milestone C Decision by MDA in Q2 FY26 approved continued procurements of Spectral Enabling Kits through FY 2027. (10) Spectral Enabling Kit (FCR-0): FY 2027 increase is attributed to the procurement of (2) additional systems, which aligns to current fielding plan. (12) Spectral Incremental Capability: FY 2027 increase is attributed to the procurement of (15) additional systems, which aligns to current fielding plan. SNAKEHEAD: (30) Snakehead Hardware - FY 2027 increase is attributed to the procurement of (17) additional Snakehead systems. Advanced IW Antennas: (11) Advanced IW Antennas; FY 2027 is the first year of procurement for Advanced IW Antennas. PACFLT UON: (24) PACFLT UON; FY 2027 is the first year of procurement for PACFLT UON. Details available at a higher classification. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 5 of 49 P-1 Line #47 Volume 2 - 221 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Shipboard IW Exploit MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 12.653 11.275 11.268 0.000 11.268 - Gross/Weapon System Cost ($ in Millions) 2,344.716 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 2,344.716 Plus CY Advance Procurement ($ in Millions) - - - - - 12.653 11.275 11.268 0.000 11.268 - Total Obligation Authority ($ in Millions) 2,344.716 FY 2027 Total - - - - - 12.653 11.275 11.268 0.000 11.268 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - Consolidated Prior Year Requirements Cost Recurring Cost 1.1.1) Consolidated PY Requirements - - 1,758.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1,758.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,758.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 3.566 - - 0.000 Subtotal: Hardware Consolidated Prior Year Requirements Cost Hardware - 1U029 Information Warfare (IW) Training Equipment Cost Recurring Cost 2.1.1) Information Warfare (IW) Training (†) Equipment 1,612.833 24 38.708 3,421.000 1 3.421 3,492.000 1 3.492 3,566.000 1 3,566.000 1 3.566 Subtotal: Recurring Cost - - 38.708 - - 3.421 - - 3.492 - - 3.566 - - 0.000 - - 3.566 Subtotal: Hardware - 1U029 Information Warfare (IW) Training Equipment Cost - - 38.708 - - 3.421 - - 3.492 - - 3.566 - - 0.000 - - 3.566 0.041 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - 1U014 SSEE Increment F (All Variants) Cost Recurring Cost 3.1.1) Navy Tactical Data Network (NTDN) (†) (1) 3.1.2) Classic Reach 438.906 32 14.045 41.000 499.000 4 1.996 - LI 2360 - Shipboard IW Exploit Navy 1 - UNCLASSIFIED Page 6 of 49 P-1 Line #47 Volume 2 - 222 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Shipboard IW Exploit MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.3) SSEE Increment F ECP Digital Filer Unit Cost ($ K) Qty (Each) 250.000 FY 2025 Total Cost ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 16 4.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 20.041 - - 0.041 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - 1U014 SSEE Increment F (All Variants) Cost - - 20.041 - - 0.041 - - 0.000 - - 0.000 - - 0.000 - - 0.000 61 358.962 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Hardware - 1U019 SSEE Modifications Cost Recurring Cost 4.1.1) SSEE Modifications 5,884.623 Subtotal: Recurring Cost - - 358.962 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - 1U019 SSEE Modifications Cost - - 358.962 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 27 7.144 27 7.295 - - 0.000 27 7.295 Subtotal: Recurring Cost - - 0.000 - - 0.000 - - 7.144 - - 7.295 - - 0.000 - - 7.295 Subtotal: Hardware - 1U045 CCOP Cost - - 0.000 - - 0.000 - - 7.144 - - 7.295 - - 0.000 - - 7.295 Hardware - 1U045 CCOP Cost Recurring Cost 5.1.1) CCOP Systems (†) (2) & Subsystems 264.593 270.185 270.185 Support - 1U555 Production Support Cost 6.1) SSEE Inc F (All Var) & SSEE Inc F (All Var) ECPs - Production Support - - 12.352 - - 0.002 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.2) SSEE Modifications Production Support - - 25.612 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 6.3) CCOP Production Support - - 0.000 - - 0.000 - - 0.521 - - 0.407 - - 0.000 - - 0.407 Subtotal: Support - 1U555 Production Support Cost - - 37.964 - - 0.002 - - 0.521 - - 0.407 - - 0.000 - - 0.407 Support - 1U776 / 1U777 Installation Cost 7.1) SSEE Increment F(V)1/2 NTDN - Install - - 2.477 - - 0.521 - - 0.107 - - 0.000 - - 0.000 - - 0.000 7.2) SSEE Increment F(V)1/2 Classic Reach Systems - Install - - 0.204 - - 0.417 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.3) SSEE Increment F(V)1/2 NTDN - DSA - - 1.513 - - 0.156 - - 0.011 - - 0.000 - - 0.000 - - 0.000 LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 7 of 49 P-1 Line #47 Volume 2 - 223 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Shipboard IW Exploit MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 7.4) SSEE Increment F(V)1/2 CLASSIC REACH - DSA - - 0.414 - - 0.045 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.5) SSEE Increment F Digital Filer - Install - - 0.000 - - 0.098 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.6) SSEE Modifications Install - - 109.061 - - 7.658 - - 0.000 - - 0.000 - - 0.000 - - 0.000 7.7) SSEE Modifications DSA - - 17.289 - - 0.294 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - 1U776 / 1U777 Installation Cost - - 130.958 - - 9.189 - - 0.118 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 2,344.716 - - 12.653 - - 11.275 - - 11.268 - - 0.000 - - 11.268 Remarks: [Hardware] Consolidated Prior Year Requirements - Ships Signal Exploitation Equipment (SSEE) Consolidated Prior Year requirements include: SSEE Inc E, SSEE Inc F (V)1/2 Shore, SSEE MODS- Shore Land Based Test Facility (LBTF), CUB Replacement, LRIP to FRP Back fit Kits, Red Falcon Upgrade Kits, LBTF Refresh Kits, Blade Delta Kits, Windows 10 NRE, JIRA NRE, SSEE Inc F (V)7/8 Recorders , RFCU kits, DRT, Medusa, XP Eradication, SSEE Increment F (V)1/2 ECP - Processing Upgrades Workstations, SSEE Increment F (V)1/2 In-line Blade Kits, SSEE Increment F (V)7/8 ECP Blade Kits, SSEE Increment F(V)1/2 Intellian Antennas, SSEE Increment F(V)1/2 Intellian Antennas, SSEE Increment F (V)1/2 ECP - 40Mhz Delta Lot 9 Backfits, IO Equipment Modules, SSC-W ECP Modules, SSC-S ECP Modules, Red Falcon ECP Modules, Medusa ECP Modules, SSEE Increment F(V)1/2 Systems (Ship & Shore), SSEE Increment F(V)7/8 (Ship & Shore) - Infrastructure as well as associated production support and installation costs. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3.1.1) Navy Tactical Data Network (NTDN) - FY 2027 decrease is attributed to funding being realigned from NTDN to merge into Distributed Operations (DO) based on Fleet needs. The FY 2027 procurement of CCOP systems will continue to satisfy signals exploitation capability gaps as determined by the CCOP Fleet Signals Development Working Group (FSDWG) and provide supplemental capability to host Signals Intelligence systems. Recommended procurements best suited to address identified gaps include: PTEK, Digital Receiver Technology (DRT), Hostile forces Integrated Targeting Service (HITS), Maritime Toxic Pen (MTP), TURBULENTWAVE / TURBULENTSAIL /BLUESTREAM servers, RED FALCON, FIREFLY, NIBBLE TRACTOR, SHEARWATER, CARBON STORM, X2J, TOXIC SMOKE, QUICKSHOT, SHOCKWAVE/WSTL, Carry On Radio Spectrum Analysis & Intelligence Reporting (CORSAIR), SHARKNADO, MONARCH/SCEPTRE, and SALVAGE. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 8 of 49 P-1 Line #47 Volume 2 - 224 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 FY Contractor and Location 2.1.1) Information Warfare (IW) Training Equipment 2025 NIWC PAC / San Diego, CA WR San Diego, CA Nov 2024 Aug 2025 1 3,421.000 Y 2.1.1) Information Warfare (IW) Training Equipment 2026 NIWC PAC / San Diego, CA WR San Diego, CA Nov 2025 Aug 2026 1 3,492.000 Y 2.1.1) Information Warfare (IW) Training Equipment 2027 NIWC PAC / San Diego, CA WR San Diego, CA Nov 2026 Aug 2027 1 3,566.000 Y 3.1.1) Navy Tactical Data Network (NTDN) 2025 Navy System Management Activity (NSMA) / San Diego, CA C / CPFF San Diego, CA Feb 2025 Feb 2026 1 41.000 Y 5.1.1) CCOP Systems & Subsystems (†) 5.1.1) CCOP Systems & Subsystems (†) Item Number / Title [DODIC]: 1 / Shipboard IW Exploit Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit (†) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 2026 (3) VARIOUS (4) / VARIOUS C / CPFF NIWC PAC/NIWC LANT Feb 2026 Jul 2026 27 264.593 N Apr 2026 Oct 2025 2027 (5) VARIOUS (4) / VARIOUS C / TBD NIWC PAC/NIWC LANT Feb 2027 Jul 2027 27 270.185 N Apr 2027 Oct 2026 indicates the presence of a P-21 Footnotes: (3) (4) CCOP Systems & Subsystems: Vendors include: CACI, Epsilon Systems, SRC, Raytheon, DRT, AUSGAR. Cryptologic Carry-on Program (CCOP) equipment is procured according to the overall requirements detailed in the Shipboard Information Warfare/Cryptologic System Operational Requirements Document and specific execution year fleet requirements as defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG). Due to a continually changing threat environment, detailed requirements are dynamic, contract award timelines and equipment procured varies each year by quantity and type. (5) CCOP Systems & Subsystems: Vendors include: CACI, Epsilon Systems, SRC, Raytheon, DRT, AUSGAR. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 9 of 49 P-1 Line #47 Volume 2 - 225 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 5.1.1) CCOP Systems & Subsystems Item Number / Title [DODIC]: 1 / Shipboard IW Exploit Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 27 0 27 1 2027 NAVY 27 0 27 A - - - - 3 3 3 18 27 O C T LI 2360 - Shipboard IW Exploit Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 49 S E P O C T N O V D E C J A N F E B P-1 Line #47 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 226 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY 5.1.1) CCOP Systems & Subsystems Item Number / Title [DODIC]: 1 / Shipboard IW Exploit Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2026 NAVY 27 9 18 1 2027 NAVY 27 0 27 3 3 3 3 3 A O C T LI 2360 - Shipboard IW Exploit Navy 3 N O V D E C J A N F E B 0 M A R A P R M A Y J U N 3 J U L 3 A U G UNCLASSIFIED Page 11 of 49 3 S E P 3 O C T 3 N O V 3 D E C 3 J A N 3 F E B P-1 Line #47 3 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 2 - 227 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Item Number / Title [DODIC]: 1 / Shipboard IW Exploit Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 VARIOUS (4) - VARIOUS 1 40 90 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 4 5 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 4 Total After Oct 1 5 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (4) Cryptologic Carry-on Program (CCOP) equipment is procured according to the overall requirements detailed in the Shipboard Information Warfare/Cryptologic System Operational Requirements Document and specific execution year fleet requirements as defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG). Due to a continually changing threat environment, detailed requirements are dynamic, contract award timelines and equipment procured varies each year by quantity and type. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 12 of 49 P-1 Line #47 Volume 2 - 228 9 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Prior Years 319.230 319.230 319.230 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 72.055 71.242 77.851 0.000 77.851 18.399 1.170 0.000 0.000 0.000 - - - - - - - - - - 72.055 71.242 77.851 0.000 77.851 18.399 1.170 0.000 0.000 0.000 - - - - - - - - - - 72.055 71.242 77.851 0.000 77.851 18.399 1.170 0.000 0.000 0.000 Total 559.947 559.947 559.947 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Engineering Change Proposal (ECP)/Obsolescence procures Commercial Off-The-Shelf/Non-Developmental Item (COTS/NDI) equipment to replace obsolete and end-of-life (EOL) equipment for the Ship's Signal Exploitation Equipment (SSEE) Increment F program (All Variants) and incorporates Pre-Planned Product Improvement (P3I) for the acquisition and localization of the latest Signals of Interest (SOI) and Information Operations (IO) capabilities into the host systems. ECP's maintain and improve upon existing capability and relevance within a rapidly evolving threat environment. ECP equipment will also be used to supplement SSEE Family of Systems (FoS) to meet their respective scalable and modular capacities meet platform mission requirements and accomplish unique signal processing capability or exploitation functionality and enable SSEE Increment F(V)7/8's scalable and modular capacity. [SSEE Tech Refresh] SSEE Tech Refresh includes three upgrades; VPX backfits which replace outdated, End-of-Life (EoL) equipment within SSEE Inc F system racks while providing modernized, open system interfaces digitizing much of the Radio Frequency (RF) transport and distribution layers within the system. Next Generation Chassis which provides enhanced data processing and greater exposure to existing system services while creating a secondary physical hosting environment to meet constricting size, weight, power, and cooling requirements. New processing and storage hardware to greatly expand SSEE Inc F's hosting capacity for capabilities to process cutting-edge signals of interest. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 13 of 49 P-1 Line #47 Volume 2 - 229 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0304785N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SSEE Inc F ECPs B Kits Recurring 1.1.1) SSEE Tech Refresh - NonOrganic (6) 1.1.2) SSEE Inc F - Next Generation Chassis (V) 2 NonOrganic - / - - / - - / - 2 / 9.382 - / - - / - - / - - / - 28 / 127.705 16 / 9.440 - / - 12 / 54.000 - / - 14 / 64.323 - / - - / - 14 / 64.323 - / - - / - - / - - / - - / - - / - 16 / 9.440 1.1.3) SSEE Inc F v(1/2) VPX Backfit Kits - NonOrganic 16 / 28.800 15 / 27.567 - / - - / - - / - - / - - / - - / - - / - - / - - / - 31 / 56.367 1.1.4) SSEE Inc F v(7/8) VPX Backfit Kits - NonOrganic 37 / 42.126 3 / 6.175 - / - - / - - / - - / - - / - - / - - / - - / - - / - 40 / 48.301 1.1.5) SSEE Increment F (V)1/2 & (V)7/8 - Next Generation Chassis - NonOrganic 95 / 47.692 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 95 / 47.692 1.1.6) SSEE Increment F(V)7/8 Spectral Capability Drops - NonOrganic 63 / 117.843 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 63 / 117.843 1.1.7) SSEE Increment F (V)1/2 - A2AD KIT NonOrganic 65 / 20.642 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 65 / 20.642 Subtotal: Recurring Subtotal: SSEE Inc F ECPs Subtotal: Procurement, All Modification Items / 257.103 - 276 / 257.103 / 257.103 - / 43.182 - 34 / 43.182 / 43.182 - / 54.000 - 12 / 54.000 / 54.000 - / 64.323 - / - - 14 / 64.323 - / - 14 / 64.323 / 64.323 - / - - - - / 64.323 - / 9.382 - / - - / - - / - 2 / 9.382 - / - - / - - / - - / - - / - - / - / 64.323 - / 9.382 / 0.000 - / / 0.000 - / 427.990 - 338 / 427.990 / 427.990 - Support (All Modification Items) 2.1) Inc F ECP Production Support - / 14.629 - / 2.423 - / 3.240 - / 3.216 - / 0.000 - / 3.216 - / 0.469 - / 0.000 - / 0.000 - / 0.000 - / - - / 23.977 2.2) Inc F ECP DSA - / 20.595 - / 8.489 - / 3.904 - / 4.186 - / 0.000 - / 4.186 - / 1.251 - / 0.106 - / 0.000 - / 0.000 - / - - / 38.531 - / 35.224 - / 10.912 - / 7.144 - / 7.402 / - - / 7.402 - / 1.720 - / 0.106 Modification Item 1 of 1: SSEE Inc F ECPs - / 26.903 - / 17.961 - / 10.098 - / 6.126 / 0.000 - / 6.126 - / 7.297 - / 1.064 Subtotal: Installation - / 26.903 - / 17.961 - / 10.098 - / 6.126 / - - / 6.126 - / 7.297 - / 1.064 Subtotal: Support - - / - - / - - / 0.000 - / 62.508 / 0.000 - / 0.000 - / 69.449 / - - / 0.000 - / 69.449 Installation - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 319.230 72.055 71.242 77.851 0.000 UNCLASSIFIED Page 14 of 49 77.851 18.399 1.170 P-1 Line #47 0.000 0.000 0.000 559.947 Volume 2 - 230 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Manufacturer Information Manufacturer Name: NSMA - VPX V(7/8) BACKFIT KITS Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2026 FY 2026 FY 2027 FY 2028 Manufacturer Name: NSMA - VPX V(1/2) BACKFIT KITS FY 2029 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2026 FY 2026 FY 2027 FY 2028 Manufacturer Name: NSMA - SSEE Inc F Next Generation Chassis (V) 2 FY 2029 Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2026 FY 2026 FY 2027 FY 2028 FY 2029 Manufacturer Name: NSMA - SSEE Tech Refresh Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2030 FY 2026 FY 2027 FY 2028 Contract Dates FY 2025 Jan 2026 Jan 2027 Jan 2028 Delivery Dates Jan 2027 Jan 2028 Jan 2029 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: SSEE Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 12 / 6.126 - / - - / - - / - - / - 0 / 0.000 12 / 6.126 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 7.297 FY 2028 - / - - / - - / - - / - - / - - / - 2 / 1.064 - / - - / - 0 / 0.000 2 / 1.064 Installation Cost LI 2360 - Shipboard IW Exploit Navy 12 / 6.126 0 / 0.000 UNCLASSIFIED Page 15 of 49 14 / 7.297 - / - P-1 Line #47 Volume 2 - 231 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Installation Information Method of Implementation: [none specified]:: Installation Name: SSEE Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 2 / 1.064 - / - - / - 0 / 0.000 Installation Cost 12 / 6.126 0 / 0.000 12 / 6.126 14 / 7.297 28 / 14.487 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 4 4 4 - 5 5 4 - 1 1 - - - - - - - - - - 28 Out - - - - - - - - - - 4 4 4 - 5 5 4 - 1 1 - - - - - - - - - - 28 Method of Implementation: IMO:: Installation Name: SSEE INC F Next Generation Chassis (V) 2 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 16 / 4.387 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 16 / 4.387 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 16 of 49 P-1 Line #47 / - - / - 16 / 4.387 16 / 4.387 Volume 2 - 232 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Installation Information Method of Implementation: IMO:: Installation Name: SSEE INC F Next Generation Chassis (V) 2 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 6 5 5 - - - - - - - - - - - - - - - - - - - - - 16 Out - - - - - - 6 5 5 - - - - - - - - - - - - - - - - - - - - - 16 Method of Implementation: [none specified]:: Installation Name: SSEE Inc F v(1/2) VPX Backfit Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 4.901 15 / 4.691 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 4.691 Prior Years - / - FY 2025 - / - 16 / 4.901 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 15 / 4.691 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 4.901 31 / 9.592 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 6 5 5 - 5 5 5 - - - - - - - - - - - - - - - - - - - - - 31 Out - - 6 5 5 - 5 5 5 - - - - - - - - - - - - - - - - - - - - - 31 Method of Implementation: IMO:: Installation Name: SSEE INC F VPX BACKFIT KITS Installation Cost Prior Years LI 2360 - Shipboard IW Exploit Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 30 / 7.485 7 / 2.330 - - - - - - - - 0 / 0.000 37 / 9.815 / - / - / - UNCLASSIFIED Page 17 of 49 / - / - / - P-1 Line #47 / - / - Volume 2 - 233 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Installation Information Method of Implementation: IMO:: Installation Name: SSEE INC F VPX BACKFIT KITS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - 3 / 1.020 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 1.020 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.020 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost Total 30 / 7.485 7 / 2.330 40 / 10.835 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 30 - 4 3 - - 1 1 1 - - - - - - - - - - - - - - - - - - - - - 40 Out 30 - 4 3 - - 1 1 1 - - - - - - - - - - - - - - - - - - - - - 40 Method of Implementation: IMO:: Installation Name: SSEE INC F Next Generation Chassis Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 77 / 10.202 18 / 4.833 95 / 15.035 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 4.833 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total LI 2360 - Shipboard IW Exploit Navy 77 / 10.202 UNCLASSIFIED Page 18 of 49 P-1 Line #47 95 / 15.035 Volume 2 - 234 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Installation Information Method of Implementation: IMO:: Installation Name: SSEE INC F Next Generation Chassis Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 77 - 6 6 6 - - - - - - - - - - - - - - - - - - - - - - - - - 95 Out 77 - 6 6 6 - - - - - - - - - - - - - - - - - - - - - - - - - 95 Method of Implementation: IMO:: Installation Name: SSEE INC F Spectral Capability Drops Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 35 / 5.384 28 / 4.470 63 / 9.854 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 28 / 4.470 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 35 / 5.384 63 / 9.854 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 35 - 10 9 9 - - - - - - - - - - - - - - - - - - - - - - - - - 63 Out 35 - 10 9 9 - - - - - - - - - - - - - - - - - - - - - - - - - 63 Method of Implementation: IMO:: Installation Name: SSEE INC F A2AD Installation Cost Prior Years LI 2360 - Shipboard IW Exploit Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 48 / 3.832 17 / 1.427 - - - - - - - - 0 / 0.000 65 / 5.259 / - / - / - UNCLASSIFIED Page 19 of 49 / - / - / - P-1 Line #47 / - / - Volume 2 - 235 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SSEE Inc F ECPs MDAP/MAIS Code: Modification Item 1 of 1: SSEE Inc F ECPs Installation Information Method of Implementation: IMO:: Installation Name: SSEE INC F A2AD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 1.427 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost Total 48 / 3.832 65 / 5.259 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 48 - 6 6 5 - - - - - - - - - - - - - - - - - - - - - - - - - 65 Out 48 - 6 6 5 - - - - - - - - - - - - - - - - - - - - - - - - - 65 Footnotes: (6) (1.1.1) SSEE Tech Refresh - Funding Increase across FYDP is in support of DDG FLT 1 Service Life Extensions fleet requirements. FY 2027 increase is attributed to the procurement of (2) additional systems, which aligns to current fielding plan. SSEE Tech Refresh combines VPX backfits, ECPs, and Next Generation Chassis and provide additional processing and storage. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 20 of 49 P-1 Line #47 Volume 2 - 236 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / SSEE Mods ECP MDAP/MAIS Code: Prior Years 134.511 134.511 134.511 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 50.997 41.395 24.972 0.000 24.972 0.473 0.000 0.000 0.000 0.000 - - - - - - - - - - 50.997 41.395 24.972 0.000 24.972 0.473 0.000 0.000 0.000 0.000 - - - - - - - - - - 50.997 41.395 24.972 0.000 24.972 0.473 0.000 0.000 0.000 0.000 Total 252.348 252.348 252.348 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Ship Signal Exploitation Equipment Modification (SSEE Mods) Engineering Change Proposal (ECP) Next Generation Graywing below-deck embedded signal processing and analysis adds advanced capabilities and system enhancements to Graywing. This includes a combination of hardware and software components added to the system baseline to meet operational system requirements. [Graywing NextGen - Ship] Graywing NextGen consists of multiple modifications and upgrades (topside and below deck) to pace specific classified Radio Frequency (RF) target sets (details held at higher classification). These threats have evolved and to ensure maximum performance against the newer target sets requires advanced RF input and processing, as well as modernized front-end and update to open system software architecture to ensure acquisition and exploitation Key Performance Parameters (KPPs) can still be met. The end-state ECP is intended to be fielded on multiple SSEE Modifications platforms. [SSEE MODS VPX Backfit Kits] SSEE MODS VPX Backfit Kits replace outdated, End-of-Life (EoL) equipment within the SSEE Modifications rack, while providing modernized, open system interfaces digitizing much of the Radio Frequency (RF) transport and distribution layers. ECP is required to field SSEE Modifications with VPX-enabled Increment F systems. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 21 of 49 P-1 Line #47 Volume 2 - 237 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / SSEE Mods ECP MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SSEE Mods ECP B Kits Recurring 1.1.1) Graywing NextGen - Ship - NonOrganic (7) 1.1.2) SSEE MODS VPX Backfit Kits - NonOrganic Subtotal: Recurring Subtotal: SSEE Mods ECP Subtotal: Procurement, All Modification Items (8) 59 / 71.565 17 / 21.592 10 / 12.968 12 / 27.984 7 / 16.667 7 / 17.017 / 99.549 - 71 / 99.549 / 99.549 - / 38.259 - 24 / 38.259 / 38.259 - / 29.985 - - / 29.985 - / - - / - / 17.374 - / - 7 / 17.374 - / - / 17.374 - / - - 17 / 29.985 - / - 7 / 17.374 - / - - / - - / - - / - - / - - / - 86 / 106.125 7 / 17.374 - - / - - / - - / - - / - - / - 33 / 79.042 / 17.374 - / - - / - - / - - / - 7 / 17.374 - / - - / - - / - - / - / 17.374 - / - - / - - / - - / - - - / 0.000 - / / 0.000 - / 185.167 - 119 / 185.167 / 185.167 - Support (All Modification Items) 2.1) Production Support / 5.823 - / 2.163 - / 1.799 - / 0.869 - / - - / 0.869 / - - / - - / - - / - - / - - / 10.654 - / 12.824 - / 2.093 - / 2.007 - / 2.049 - / - - / 2.049 - / 0.190 - / - - / - - / - - / - - / 19.163 - / 18.647 - / 4.256 - / 3.806 - / 2.918 - / - - / 2.918 - / 0.190 - / - - / - - / - - / 0.000 - / 29.817 Modification Item 1 of 1: SSEE Mods ECP - / 16.315 - / 8.482 - / 7.604 - / 4.680 / 0.000 - / 4.680 - / 0.283 / 0.000 - / 0.000 - / 37.364 Subtotal: Installation - / 16.315 - / 8.482 - / 7.604 - / 4.680 / - - / 4.680 - / 0.283 / - - / 0.000 - / 37.364 2.2) DSA Subtotal: Support - - Installation - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 134.511 50.997 41.395 24.972 0.000 UNCLASSIFIED Page 22 of 49 24.972 0.473 0.000 P-1 Line #47 0.000 0.000 0.000 252.348 Volume 2 - 238 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / SSEE Mods ECP MDAP/MAIS Code: Modification Item 1 of 1: SSEE Mods ECP Manufacturer Information Manufacturer Name: NSMA - Graywing Ship Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Jan 2026 Jan 2027 FY 2027 FY 2028 Manufacturer Name: NSMA - VPX BACKFIT KITS FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2025 Jan 2026 Jan 2027 Delivery Dates Jan 2026 Jan 2027 Jan 2028 FY 2029 Installation Information Method of Implementation: IMO:: Installation Name: Graywing Nextgen - Ship Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 40 / 16.315 19 / 8.026 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 59 / 24.341 17 / 7.332 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 17 / 7.332 10 / 4.403 - / - - / - - / - - / - 0 / 0.000 10 / 4.403 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 4.403 - / - - / - - / - - / - 0 / 0.000 Total 40 / 16.315 19 / 8.026 10 / 4.403 17 / 7.332 0 / 0.000 10 / 4.403 0 / 0.000 86 / 36.076 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 40 - 7 6 6 - 6 6 5 - 4 3 3 - - - - - - - - - - - - - - - - - 86 Out 40 - 7 6 6 - 6 6 5 - 4 3 3 - - - - - - - - - - - - - - - - - 86 LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 23 of 49 P-1 Line #47 Volume 2 - 239 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / SSEE Mods ECP MDAP/MAIS Code: Modification Item 1 of 1: SSEE Mods ECP Installation Information Method of Implementation: IMO:: Installation Name: SSEE MODS VPX Backfit Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 0.456 FY 2025 - / - 12 / 0.456 - / - 7 / 0.272 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 0.272 FY 2026 - / - - / - - / - 7 / 0.277 0 / 0.000 7 / 0.277 - / - - / - - / - - / - 0 / 0.000 7 / 0.277 FY 2027 - / - - / - - / - - / - - / - - / - 7 / 0.283 - / - - / - - / - 0 / 0.000 7 / 0.283 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 7 / 0.283 - / - - / - - / - 0 / 0.000 12 / 0.456 7 / 0.272 7 / 0.277 0 / 0.000 7 / 0.277 33 / 1.288 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 4 4 4 - 3 2 2 - 3 2 2 - 3 2 2 - - - - - - - - - - - - - 33 Out - - 4 4 4 - 3 2 2 - 3 2 2 - 3 2 2 - - - - - - - - - - - - - 33 Footnotes: (7) (8) (1.1.1) Graywing Nextgen-Ship- FY 2027 decrease is due to completion of procurements in FY 2026. (1.1.2) SSEE MODS VPX Backfit Kits - Increase is due to increase in budget to support DDG FLT 1 Service Life Extensions. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 24 of 49 P-1 Line #47 Volume 2 - 240 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Real Time Spectrum Operations Own Force Monitoring Hardware MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 20.431 8.831 9.918 9.206 0.000 9.206 9.400 9.550 9.798 - - - - - - - - - 20.431 8.831 9.918 9.206 0.000 9.206 9.400 9.550 9.798 - - - - - - - - - 20.431 8.831 9.918 9.206 0.000 9.206 9.400 9.550 9.798 To FY 2031 Complete 10.005 Continuing - Continuing - 10.005 Continuing - Total - Continuing - - 10.005 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Real-Time Spectrum Operations (RTSO) effort researches and develops software and hardware to automate analyses of the Electromagnetic (EM) Environmental Effects (E3) between shipboard transmitters and receivers on ships and the interactions of the EM systems within the other systems installed on units within a strike group. RTSO develops and updates numerical models, algorithms, data bases, and software which aids and supports warfighter spectrum planning, sensing and monitoring characterization and prediction, and managing and maneuvering within the EM spectrum. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 25 of 49 P-1 Line #47 Volume 2 - 241 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Real Time Spectrum Operations Own Force Monitoring Hardware MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0605886N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Real Time Spectrum Operations - Own Force Monitoring Hardware B Kits Recurring 1.1.1) Real Time Spectrum Operations - Own Force Monitoring Hardware - NonOrganic (9) Subtotal: Recurring Subtotal: Real Time Spectrum Operations - Own Force Monitoring Hardware Subtotal: Procurement, All Modification Items 24 / 10.203 / 10.203 - 24 / 10.203 - 10 / 4.378 - / 4.378 10 / 4.378 11 / 4.917 - / 4.917 11 / 4.917 10 / 4.564 - / - 10 / 4.564 / 4.564 - / - - 10 / 4.564 - / - 10 / 4.564 - / 4.564 10 / 4.660 - / 4.660 10 / 4.660 10 / 4.758 - / 4.758 10 / 4.758 10 / 4.858 - / 4.858 10 / 4.858 10 / 4.960 Continuing Continuing / 4.960 Continuing Continuing 10 / 4.960 Continuing Continuing - / 10.203 - / 4.378 - / 4.917 - / 4.564 - / - - / 4.564 - / 4.660 - / 4.758 - / 4.858 - / 4.960 Continuing Continuing Support (All Modification Items) 2.1) Production Support - / 0.570 - / 0.262 - / 0.295 - / 0.274 - / - - / 0.274 - / 0.280 - / 0.238 - / 0.291 - / 0.298 Continuing Continuing 2.2) DSA - / 1.884 - / 0.855 - / 0.960 - / 0.891 - / - - / 0.891 - / 0.910 - / 0.929 - / 0.948 - / 0.968 Continuing Continuing - / 2.454 - / 1.117 - / 1.255 - / 1.165 - / - - / 1.165 - / 1.190 - / 1.167 - / 1.239 - / 1.266 Continuing Continuing Modification Item 1 of 1: Real Time Spectrum Operations - Own Force Monitoring Hardware - / 7.774 - / 3.336 - / 3.746 - / 3.477 / 0.000 - / 3.477 - / 3.550 - / 3.625 - / 3.701 - / 3.779 - / 3.858 - / 36.846 Subtotal: Installation - / 7.774 - / 3.336 - / 3.746 - / 3.477 / - - / 3.477 - / 3.550 - / 3.625 - / 3.701 - / 3.779 - / 3.858 - / 36.846 10.005 Continuing Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 20.431 8.831 9.918 9.206 0.000 UNCLASSIFIED Page 26 of 49 9.206 9.400 9.550 P-1 Line #47 9.798 Continuing Volume 2 - 242 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Real Time Spectrum Operations Own Force Monitoring Hardware MDAP/MAIS Code: Modification Item 1 of 1: Real Time Spectrum Operations - Own Force Monitoring Hardware Manufacturer Information Manufacturer Name: NIWC PAC Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Installation Information Method of Implementation: FIO:: Installation Name: Real Time Spectrum Operations - Own Force Monitoring Hardware Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 24 / 7.774 10 / 3.336 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 3.336 11 / 3.746 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 3.746 10 / 3.477 - / - - / - - / - - / - 0 / 0.000 10 / 3.477 10 / 3.550 - / - - / - - / - 0 / 0.000 10 / 3.550 10 / 3.625 - / - - / - 0 / 0.000 10 / 3.625 10 / 3.701 - / - 0 / 0.000 10 / 3.701 10 / 3.779 0 / 3.858 10 / 7.637 Prior Years 24 / 7.774 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 24 / 7.774 10 / 3.336 10 / 3.477 11 / 3.746 0 / 0.000 10 / 3.477 0 / 0.000 10 / 3.477 10 / 3.550 10 / 3.625 - 10 / 3.701 / - - 10 / 3.779 / - - 0 / 3.858 / - 95 / 36.846 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 24 - - 5 5 - - 6 5 - - 5 5 - - 5 5 - - 5 5 - - 5 5 - - 5 5 - 95 Out 17 5 - - 5 10 95 7 - - 5 5 - - 6 5 - - 5 5 - - 5 5 - - 5 5 - - - Footnotes: (9) (1.1.1) Real Time Spectrum Operations - Own Force Monitoring Hardware - FY 2027 decrease is attributed to the procurement of (1) less systems, which aligns to current fielding plan. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 27 of 49 P-1 Line #47 Volume 2 - 243 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / Horizon / Distributed Ops Hardware MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 52.909 25.654 37.357 51.460 0.000 51.460 41.228 36.026 29.194 - - - - - - - - - 52.909 25.654 37.357 51.460 0.000 51.460 41.228 36.026 29.194 - - - - - - - - - 52.909 25.654 37.357 51.460 0.000 51.460 41.228 36.026 29.194 To FY 2031 Complete 54.147 Continuing - Continuing - 54.147 Continuing - Total - Continuing - - 54.147 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Horizon and Distributed Operations (DO) support the Over The Horizon-Targeting (OTH-T) and Counter-Command, Control, Computing, Communications, Cyber, Intelligence, Surveillance, Reconnaissance and Targeting (C-C5ISRT) mission threads for afloat and ashore users. Details held at a higher classification. [Horizon Hardware] Horizon provides the initial Battle Management Aids (BMA) vital to plan and execute offensive and defensive IW in the Electromagnetic (EM) spectrum and physical space. The classification for Horizon's quantities and locations has been reduced to an unclassified environment. Program specific details held at a higher classification. [Distributed Ops Hardware] Distributed Operations (DO) provides the enabling sea/shore infrastructure including cloud computing, data feeds, and data aggregators needed to expand assets on a Distributed Signal Intelligence (SIGINT) Operations (DSO) grid. DO is intended to fulfil Department of War (DoW) level capability requirement voids for shipboard cryptologic systems including SSEE and Spectral. The classification for DO's quantities and locations has been reduced to an unclassified environment. Program specific details held at a higher classification. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 28 of 49 P-1 Line #47 Volume 2 - 244 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Horizon / Distributed Ops Hardware MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0304785N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Horizon / Distributed Ops Hardware B Kits Recurring 1.1.1) Horizon Hardware - NonOrganic 2 / 37.435 (10) 1.1.2) Distributed Ops Hardware - NonOrganic - (11) Subtotal: Recurring Subtotal: Horizon / Distributed Ops Hardware Subtotal: Procurement, All Modification Items / - / 37.435 - 2 / 37.435 / 37.435 - 27 / 20.682 - / - / 20.682 - 27 / 20.682 / 20.682 - 23 / 17.988 12 / 14.232 / 32.220 - 35 / 32.220 / 32.220 - 20 / 15.970 - / - 23 / 27.851 - / - 23 / 27.851 / 43.821 - / - - 43 / 43.821 - / - 43 / 43.821 / 43.821 - / - - - - 20 / 15.970 / 43.821 / 43.821 17 / 13.860 15 / 18.545 / 32.405 - 32 / 32.405 / 32.405 - 14 / 11.654 14 / 17.672 / 29.326 - 28 / 29.326 / 29.326 - 12 / 10.199 10 / 12.888 / 23.087 - 22 / 23.087 / 23.087 - 12 / 10.413 Continuing Continuing 28 / 36.844 Continuing Continuing / 47.257 Continuing Continuing 40 / 47.257 Continuing Continuing / 47.257 Continuing Continuing - - Support (All Modification Items) 2.1) Production Support - / 1.872 - / 1.233 - / 1.885 - / 2.351 - / - - / 2.351 - / 1.620 - / 1.466 - / 1.283 - / 2.835 Continuing Continuing 2.2) DSA - / 2.242 - / 0.634 - / 0.551 - / 0.490 - / - - / 0.490 - / 0.425 - / 0.357 - / 0.313 - / 0.319 Continuing Continuing - / 4.114 - / 1.867 - / 2.436 - / 2.841 - / - - / 2.841 - / 2.045 - / 1.823 - / 1.596 - / 3.154 Continuing Continuing / 0.000 - / 4.798 - / 6.778 - / 4.877 - / 4.511 - / 3.736 - / 7.809 - / 49.675 / - - / 4.798 - / 6.778 - / 4.877 - / 4.511 - / 3.736 - / 7.809 - / 49.675 54.147 Continuing Subtotal: Support Installation Modification Item 1 of 1: Horizon / Distributed Ops Hardware - / 11.360 - / 3.105 - / 2.701 - / 4.798 Subtotal: Installation - / 11.360 - / 3.105 - / 2.701 - / 4.798 - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 52.909 25.654 37.357 51.460 0.000 UNCLASSIFIED Page 29 of 49 51.460 41.228 36.026 P-1 Line #47 29.194 Continuing Volume 2 - 245 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Horizon / Distributed Ops Hardware MDAP/MAIS Code: Modification Item 1 of 1: Horizon / Distributed Ops Hardware Manufacturer Information Manufacturer Name: NIWC PAC Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Manufacturer Name: NSMA - DO Hardware Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: Horizon Hardware Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 11.360 27 / 3.105 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 27 / 3.105 23 / 2.701 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 23 / 2.701 20 / 2.398 - / - - / - - / - - / - 0 / 0.000 20 / 2.398 17 / 2.081 - / - - / - - / - 0 / 0.000 17 / 2.081 14 / 1.750 - / - - / - 0 / 0.000 14 / 1.750 12 / 1.531 - / - 0 / 0.000 12 / 1.531 12 / 1.563 0 / 1.596 12 / 3.159 Prior Years 2 / 11.360 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 11.360 27 / 3.105 20 / 2.398 23 / 2.701 0 / 0.000 20 / 2.398 0 / 0.000 20 / 2.398 17 / 2.081 14 / 1.750 - 12 / 1.531 / - - 12 / 1.563 / - - 0 / 1.596 / - 127 / 28.085 Installation Schedule FY 2025 PYS Q1 Q2 In 2 - Out 2 - FY 2026 Q3 Q4 Q1 Q2 - 14 13 - - - 14 13 LI 2360 - Shipboard IW Exploit Navy FY 2027 Q3 Q4 Q1 Q2 - 12 11 - - - 12 21 FY 2028 Q3 Q4 Q1 Q2 - 10 10 - - - - 10 - - FY 2029 Q3 Q4 Q1 Q2 9 8 - - - 9 UNCLASSIFIED Page 30 of 49 8 - FY 2030 Q3 Q4 Q1 Q2 7 7 - - - 7 7 - P-1 Line #47 FY 2031 Q3 Q4 Q1 Q2 6 6 - - - 6 6 - Q3 Q4 TC Tot 6 6 - 127 - 6 6 127 Volume 2 - 246 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Horizon / Distributed Ops Hardware MDAP/MAIS Code: Modification Item 1 of 1: Horizon / Distributed Ops Hardware Installation Information Method of Implementation: [none specified]:: Installation Name: Distributed Ops Hardware Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 12 / 2.400 - / - - / - - / - - / - 0 / 0.000 12 / 2.400 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 23 / 4.697 FY 2028 - / - - / - - / - - / - - / - - / - - / - 15 / 3.127 - / - - / - 0 / 0.000 15 / 3.127 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 14 / 2.980 - / - 0 / 0.000 14 / 2.980 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 2.173 0 / 0.000 10 / 2.173 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 28 / 6.213 28 / 6.213 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - Installation Cost 12 / 2.400 0 / 0.000 12 / 2.400 0 / 0.000 23 / 4.697 12 / 2.400 23 / 4.697 15 / 3.127 14 / 2.980 - 10 / 2.173 / - - 28 / 6.213 / - 102 / 21.590 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 4 4 4 - 8 8 7 - 5 5 5 - 5 5 4 - 4 3 3 28 102 Out - - - - - - - - - - 4 4 8 8 5 5 5 5 4 3 31 102 - 4 - 7 - 5 - 4 - Footnotes: (10) (11) (1.1.1) Horizon Hardware - The FY 2027 decrease is attributed to the procurement of (3) fewer systems, which aligns to current fielding plan. (1.1.2) Distributed Ops Hardware - The FY 2027 increase is attributed to procurement of (11) additional systems which aligns to current fielding plan. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 31 of 49 P-1 Line #47 Volume 2 - 247 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / Integrated Communications and Data System (ICADS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 67.430 31.996 49.617 71.175 0.000 71.175 38.088 21.584 17.230 - - - - - - - - - 67.430 31.996 49.617 71.175 0.000 71.175 38.088 21.584 17.230 - - - - - - - - - 67.430 31.996 49.617 71.175 0.000 71.175 38.088 21.584 17.230 To FY 2031 Complete 17.642 Continuing - Continuing - 17.642 Continuing - Total - Continuing - - 17.642 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Integrated Communications and Data System (ICADS) Increment II is a Chief of Naval Operations (CNO) directed mission critical system providing advanced simulation capabilities and limited back-up communications for Naval platforms. ICADS Increment II provides a scalable capability dependent on host platform requirements. ICADS Increment III provides a subset of Increment II capabilities in a smaller form factor. Specific program details held at a higher classification. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 32 of 49 P-1 Line #47 Volume 2 - 248 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Integrated Communications and Data System (ICADS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0304785N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Integrated Communications and Data System (ICADS) B Kits Recurring 1.1.1) ICADS Increment II Hardware - NonOrganic 1.1.2) ICADS Inc III Hardware - Organic 8 / 58.579 (12) - (13) Subtotal: Recurring Subtotal: Integrated Communications and Data System (ICADS) Subtotal: Procurement, All Modification Items / - / 58.579 - 8 / 58.579 / 58.579 - 3 / 22.896 3 / 23.377 5 / 39.780 - / - 5 / 39.780 1 / 8.123 80 / 3.200 472 / 19.276 464 / 23.200 - / - 464 / 23.200 406 / 20.726 / 62.980 - / - - 469 / 62.980 - / - 469 / 62.980 / 62.980 - / - - / 26.096 - 83 / 26.096 / 26.096 - / 42.653 - 475 / 42.653 / 42.653 - - - / 62.980 / 62.980 / 28.849 - 407 / 28.849 / 28.849 - - / - 365 / 19.025 / 19.025 - 365 / 19.025 / 19.025 - - / - 309 / 16.267 / 16.267 - 309 / 16.267 / 16.267 - - / - 316 / 16.802 - / - 20 / 152.755 Continuing Continuing / 16.802 Continuing Continuing 316 / 16.802 Continuing Continuing Continuing Continuing - / 16.802 - Support (All Modification Items) 2.1) Production Support - / 3.208 - / 1.567 - / 2.540 - / 3.678 - / - - / 3.678 - / 1.552 - / 0.989 - / 0.963 - / 0.840 / - - / 15.337 - / 3.208 - / 1.567 - / 2.540 - / 3.678 - / - - / 3.678 - / 1.552 - / 0.989 - / 0.963 - / 0.840 - / 0.000 - / 15.337 Modification Item 1 of 1: Integrated Communications and Data System (ICADS) - / 5.643 - / 4.333 - / 4.424 - / 4.517 / 0.000 - / 4.517 - / 7.687 - / 1.570 - / 0.000 - / 0.000 - / 0.000 - / 28.174 Subtotal: Installation - / 5.643 - / 4.333 - / 4.424 - / 4.517 / - - / 4.517 - / 7.687 - / 1.570 / - - / 0.000 - / 28.174 17.642 Continuing Subtotal: Support - Installation - - / - - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 67.430 31.996 49.617 71.175 0.000 UNCLASSIFIED Page 33 of 49 71.175 38.088 21.584 P-1 Line #47 17.230 Continuing Volume 2 - 249 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Integrated Communications and Data System (ICADS) MDAP/MAIS Code: Modification Item 1 of 1: Integrated Communications and Data System (ICADS) Manufacturer Information Manufacturer Name: NSMA - ICADS Inc II Hardware Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Delivery Dates Feb 2026 Feb 2027 Feb 2028 Feb 2029 Manufacturer Name: NSMA - ICADS Inc III Hardware FY 2030 FY 2031 Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 6 Dates FY 2029 Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Delivery Dates Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Apr 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: ICADS Increment II Hardware Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 5.643 3 / 4.333 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 9.976 FY 2025 - / - - / - 3 / 4.424 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 4.424 FY 2026 - / - - / - - / - 3 / 4.517 0 / 0.000 3 / 4.517 - / - - / - - / - - / - 0 / 0.000 3 / 4.517 FY 2027 - / - - / - - / - - / - - / - - / - 5 / 7.687 - / - - / - - / - 0 / 0.000 5 / 7.687 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 1.570 - / - - / - 0 / 0.000 1 / 1.570 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 5 / 5.643 1 / 1.570 - / - - / - 0 / 0.000 Installation Cost LI 2360 - Shipboard IW Exploit Navy 3 / 4.333 3 / 4.424 3 / 4.517 0 / 0.000 UNCLASSIFIED Page 34 of 49 3 / 4.517 5 / 7.687 P-1 Line #47 20 / 28.174 Volume 2 - 250 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Integrated Communications and Data System (ICADS) MDAP/MAIS Code: Modification Item 1 of 1: Integrated Communications and Data System (ICADS) Installation Information Method of Implementation: [none specified]:: Installation Name: ICADS Increment II Hardware Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 - 1 1 1 - 1 1 1 - 1 1 1 - 2 2 1 - 1 - - - - - - - - - - - 20 Out 5 - 1 1 1 - 1 1 1 - 1 1 1 - 2 2 1 - 1 - - - - - - - - - - - 20 Method of Implementation (Organic): ICADS Inc III Hardware - Not Installed Installation Quantity: 2412 Footnotes: (12) (13) (1.1.1) ICADS Inc II - FY 2027 increase is attributed to the procurement of (2) additional ICADS Inc II systems, which aligns to current fielding plan. (1.1.2) ICADS Inc III Hardware - FY 2027 decrease is due to the procurement of (8) fewer systems in alignment with the ICADS Increment III Rapid Fielding program. ICADS Increment III provides a subset of Increment II capabilities in a smaller form factor. Hardware is not permanently installed on platforms and is a carry-on carry-off capability. Specific program details held at a higher classification. (1.1.2) ICADS Inc III Hardware - Unit Cost increase from FY 2026 to FY 2027 of 22% reflects a correction in the cost estimate to reflect Technical Readiness Level (TRL) 7/8 requirements. The vendor's definitized cost now accurately captures the true cost per unit, reflecting the realities of the current supply chain. While this increase is significant, it prevents potentially far larger cost overruns later in the program. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 35 of 49 P-1 Line #47 Volume 2 - 251 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / SPECTRAL MDAP/MAIS Code: Prior Years 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 159.729 159.729 159.729 142.348 142.348 142.348 176.657 - 0.000 - 176.657 - 0.000 - 176.657 0.000 176.657 176.657 176.657 258.121 258.121 258.121 269.129 269.129 269.129 288.360 288.360 288.360 To FY 2031 Complete 275.051 Continuing 275.051 275.051 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Spectral Program is an incremental acquisition, Government Off-The-Shelf/Commercial Off-The-Shelf (GOTS/COTS) program that provides cryptologic signals exploitation capabilities designed to meet the requirements for shipboard cryptologic operations within the Ship's Signal Exploitation Space (SSES) aboard a variety of ship classes and shore facilities. The Spectral system will provide a mobile, passive capability to detect, classify, track, and determine the intent of enemy units through exploitation of their command and control emissions. The Spectral System will leverage existing architectures and support the integrated fires construct with Shipboard Combat Systems providing non-kinetic engagement to enhance combat effectiveness. The system will be scalable, reconfigurable to mission, modular, remotable and dynamically reprogrammable in response to new threats and capabilities. The Spectral System will deliver improved information/cyber warfare planning, exploitation, and attack capabilities across Naval platforms. Spectral Enabling Capability (FCR-0) - Spectral Enabling Capability is tightly coupled signal collection and exploitation hardware infrastructure needed to prosecute next-generation signals of interest and Radio Frequency threats. Unique high-power signal processing, storage, compute resources are needed to effectively meet acquisition and geolocation requirements and will be procured and delivered as kits for shipboard installation and can be installed in small windows of opportunity and Chief of Naval Operations availability periods (additional details on signal threats held at higher classification). Spectral Incremental Capability Delivery - The Spectral Incremental Capability Delivery enables Radio Frequency upgrades that enable the dynamic collection and exploitation of next-generation signals of interest. The upgrades are required to meet acquisition and geolocation requirements. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 36 of 49 P-1 Line #47 Volume 2 - 252 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SPECTRAL MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SPECTRAL B Kits Recurring 1.1.1) Spectral Enabling Kits (FCR-0) - NonOrganic (14) - / - 1.1.2) Spectral Incremental Capability - NonOrganic (15) - / - 1.1.3) Spectral Systems - NonOrganic Subtotal: Recurring - Subtotal: SPECTRAL Subtotal: Procurement, All Modification Items / / 0.000 - / / 0.000 - 11 / 150.700 - - / - - / - / 150.700 8 / 111.902 - / 150.700 / - - / - / 111.902 - 11 / 150.700 - 8 / 111.902 / 111.902 - 10 / 142.814 - / - 10 / 142.814 12 / 7.200 - / - 12 / 7.200 / - - / - / 150.014 - - / - - 22 / 150.014 - / - 22 / 150.014 / 150.014 - / - - - - - / - / 150.014 / 150.014 - / - - 12 / 7.351 12 / 202.844 / 210.195 - 24 / 210.195 / 210.195 - / - - / - - / - - / - 29 / 405.416 5 / 3.127 - / - - / - - / - 29 / 17.678 12 / 207.104 / 210.231 - 17 / 210.231 / 210.231 - 13 / 229.074 / 229.074 - 13 / 229.074 / 229.074 - 12 / 215.894 Continuing Continuing / 215.894 Continuing Continuing 12 / 215.894 Continuing Continuing / 215.894 Continuing Continuing - - Support (All Modification Items) 2.1) Production Support - / - - / 8.039 - / 6.714 - / 7.501 - / - - / 7.501 2.2) DSA - / - - / 0.990 - / 1.072 - / 2.316 - / - - / 2.316 - / 0.000 - / 9.029 - / 7.786 - / 9.817 - / - - / 9.817 - / 20.452 - / 18.600 - / 21.790 - / 20.566 Modification Item 1 of 1: SPECTRAL - / 0.000 - Subtotal: Installation - / 0.000 - 0.000 159.729 Subtotal: Support - / 12.611 - - / 7.841 / 10.512 - - / 8.088 / 13.743 - - / 8.047 - / 12.954 - / - - / 7.612 - / - - - / 72.074 / 35.966 / 0.000 - / 108.040 Installation / 0.000 - / 22.660 - / 16.826 / - - / 22.660 - / 16.826 - / 0.000 - / 16.826 - / 27.474 - / 40.298 - / 37.496 - / 38.591 - / 36.370 - / 219.715 / - - / 16.826 - / 27.474 - / 40.298 - / 37.496 - / 38.591 - / 36.370 - / 219.715 - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 142.348 176.657 0.000 UNCLASSIFIED Page 37 of 49 176.657 258.121 269.129 P-1 Line #47 288.360 275.051 Continuing Continuing Volume 2 - 253 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SPECTRAL MDAP/MAIS Code: Modification Item 1 of 1: SPECTRAL Manufacturer Information Manufacturer Name: NSMA - SPECTRAL ENABLING CAPABILITY - INFRASTRUCTURE Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 Contract Dates Mar 2025 Mar 2026 Mar 2027 FY 2028 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Manufacturer Name: NSMA - Spectral Incremental Capability Delivery FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 6 Dates FY 2029 Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Mar 2027 Mar 2028 Mar 2029 Delivery Dates Mar 2028 Mar 2029 Mar 2030 Installation Information Method of Implementation: [none specified]:: Installation Name: Spectral Enabling Kits (FCR-0) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 16.826 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 21.474 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost / - 11 / 22.660 8 / 16.826 11 / 22.660 0 / 0.000 8 / 16.826 8 / 16.826 0 / 0.000 10 / 21.474 8 / 16.826 10 / 21.474 / - - / - 11 / 22.660 29 / 60.960 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 6 5 - - 4 4 - - 5 5 - - - - - - - - - - - - - 29 Out - - - - - - - 6 5 - - 4 4 - - 5 5 - - - - - - - - - - - - - 29 LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 38 of 49 P-1 Line #47 Volume 2 - 254 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SPECTRAL MDAP/MAIS Code: Modification Item 1 of 1: SPECTRAL Installation Information Method of Implementation: [none specified]:: Installation Name: Spectral Incremental Capability Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 12 / 6.000 - / - - / - - / - 0 / 0.000 12 / 6.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 6.126 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.606 - / - 0 / 0.000 5 / 2.606 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 5 / 2.606 - / - 0 / 0.000 Installation Cost 12 / 6.126 12 / 6.000 12 / 6.126 29 / 14.732 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - 6 6 - - 6 6 - - 3 2 - - - - - 29 Out - - - - - - - - - - - - - - - 6 6 - - 6 6 - - 3 2 - - - - - 29 Method of Implementation: FIO:: Installation Name: SPECTRAL Hardware Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 34.172 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 34.890 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 13 / 38.591 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 36.370 12 / 36.370 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 39 of 49 12 / 34.172 P-1 Line #47 12 / 34.890 13 / 38.591 - / - - / - Volume 2 - 255 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SPECTRAL MDAP/MAIS Code: Modification Item 1 of 1: SPECTRAL Installation Information Method of Implementation: FIO:: Installation Name: SPECTRAL Hardware Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - 12 / 34.172 12 / 34.890 13 / 38.591 12 / 36.370 49 / 144.023 Total / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - 6 6 - - 6 6 - - 7 6 12 49 Out - - - - - - - - - - - - - - - - - - - 7 18 49 - 6 6 - - 6 6 - - Footnotes: (14) (1.1.1) Spectral Enabling Kits (FCR-0) - Spectral Enabling Kits began procurements in FY 2025 with an approval of Limited Production Decision (LPD) by the Milestone Decision Authority (MDA). Favorable Milestone C Decision by MDA in Q2 FY 2026 approved continued procurements of Spectral Enabling Kits through FY 2027 up to 29 systems to accelerate the Fleet Capability Release plan. (15) (1.1.2) Spectral Incremental Capability - FY 2027 increase due to initiation of Spectral Incremental Capability procurements to enable Radio Frequency upgrades that enable the dynamic collection and exploitation of next-generation signals of interest LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 40 of 49 P-1 Line #47 Volume 2 - 256 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / Snakehead MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 0.000 0.000 16.756 39.108 0.000 39.108 51.011 9.513 0.000 0.000 0.000 - - - - - - - - - - - 0.000 0.000 16.756 39.108 0.000 39.108 51.011 9.513 0.000 0.000 0.000 - - - - - - - - - - - 0.000 0.000 16.756 39.108 0.000 39.108 51.011 9.513 0.000 0.000 0.000 Total 116.388 116.388 116.388 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Snakehead program will provide two programs with a new signal capability. The signal capability will be provided to the Integrated Communication and Data System (ICADS) and the Ship's Signal Exploitation Space (SSES). The Snakehead capability will consist of open architecture hardware and software that will be hosted by ICADS and SSES for operational use. The Snakehead capability is the technologically mature version and form of a previous development effort transitioned to ICADS and the SSEE Increment F program. Snakehead is currently fielded as a mission module on service combatant ships. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 41 of 49 P-1 Line #47 Volume 2 - 257 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / Snakehead MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Snakehead B Kits Recurring 1.1.1) Snakehead Hardware - Organic - (16) Subtotal: Recurring - Subtotal: Snakehead Subtotal: Procurement, All Modification Items - / - - / - 13 / 15.808 / 0.000 - / - - / - - / - 13 / 15.808 / 0.000 - / - - / 15.808 / 15.808 30 / 37.246 - / - 30 / 37.246 / 37.246 - / - - 30 / 37.246 - / - 30 / 37.246 / 37.246 - / - - - - / 37.246 / 37.246 38 / 48.169 / 48.169 - 38 / 48.169 - 7 / 9.060 - / - - / - / 9.060 - / - - / - 7 / 9.060 - / - - / - - / 48.169 - / 9.060 - / - - / - - / / 0.000 - / / 0.000 - 88 / 110.283 / 110.283 - 88 / 110.283 / 110.283 - Support (All Modification Items) 2.1) Production Support Subtotal: Support - / - - / - - / 0.948 - / 1.862 - / - - / 1.862 - / 2.842 - / 0.453 - / - - / - / 0.000 - / - - / 0.948 - / 1.862 - / - - / 1.862 - / 2.842 - / 0.453 - / - - / - / - - / - / - - / - / - - / - - / - - / - - / 6.105 / 0.000 - / 6.105 Installation Subtotal: Installation - - / - - - / - - / - - - / - - / - 0.000 116.388 Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 0.000 0.000 16.756 39.108 0.000 UNCLASSIFIED Page 42 of 49 39.108 51.011 9.513 P-1 Line #47 0.000 0.000 Volume 2 - 258 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / Snakehead MDAP/MAIS Code: Modification Item 1 of 1: Snakehead Manufacturer Information Manufacturer Name: NSMA - Snakehead Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 FY 2030 FY 2031 Footnotes: (16) (1.1.1) Snakehead Hardware - FY 2027 increase is attributed to the procurement of (17) additional Snakehead systems. Hardware is not permanently installed on platforms and is a carry-on carry-off capability. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 43 of 49 P-1 Line #47 Volume 2 - 259 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / Advanced IW Antennas MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 34.375 0.000 34.375 60.982 68.490 78.120 - - - - - - - - - 0.000 0.000 0.000 34.375 0.000 34.375 60.982 68.490 78.120 - - - - - - - - - 0.000 0.000 0.000 34.375 0.000 34.375 60.982 68.490 78.120 To FY 2031 Complete 85.656 Continuing - Continuing - 85.656 Continuing - Total - Continuing - - 85.656 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Advanced Information Warfare Antennas (AIWA) program will procure: 1) the High Gain, Narrow Band (HGNB), a satellite communications (SATCOM) antenna with simultaneous Ku/Ka dual-band capability; 2) New Graywing Antenna Development (NewGRAD) to meet Graywing mission requirements and provide Super High Frequency (SHF) direction finding; 3) Updated antenna form factor and associated electronics for the AS-4683 L-Band antenna 4) High Frequency (HF) Direction Finding (DF) antenna; and 5) a Very/Ultra High Frequency (V/UHF) transmit antenna. These antennas will address insufficiencies in existing frequency bands, providing relevant responses to emerging technologies and weapons systems utilizing the Radio Frequency spectrum that pose a threat to U.S. Surface Navy platforms and their intended mission. The host systems for AIWA are Ship's Signal Exploitation Equipment (SSEE) Family of Systems (FoS) and Spectral and will integrate Real-Time Spectrum Operations (RTSO) Own Force Monitoring capabilities to provide the next generation of Information Operations, Electronic Warfare, Signals Intelligence, and Spectrum Management to fleet users. This program will procure Advanced Information Warfare Antennas to enable needed/relevant maritime, surface Information Operations (e.g., Electronic Warfare (EW), Signals Intelligence (SIGINT) for Ship's Signal Exploitation Equipment (SSEE) Increment F and Modifications, Spectral, Real Time Spectrum Operations (RTSO), and other programs held at higher classification. Operating in set frequency bands, existing antennas are not sufficient to pace emerging technologies and weapons systems utilizing the Radio Frequency spectrum that pose a threat to U.S. Surface Navy platforms and their intended mission. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 44 of 49 P-1 Line #47 Volume 2 - 260 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / Advanced IW Antennas MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Advanced IW Antennas B Kits Recurring 1.1.1) AIWA Systems - NonOrganic - (17) Subtotal: Recurring - Subtotal: Advanced IW Antennas Subtotal: Procurement, All Modification Items - / - - / - - / - 11 / 27.500 - / - 11 / 27.500 / 0.000 - / - - / - - / 27.500 - / - - / - - / - - / - 11 / 27.500 - / - 11 / 27.500 / 0.000 - / - - / - - / 27.500 - / - - / 27.500 / 27.500 11 / 28.078 / 28.078 - 11 / 28.078 / 28.078 - 13 / 33.879 / 33.879 - 13 / 33.879 / 33.879 - 14 / 37.252 / 37.252 - 14 / 37.252 / 37.252 - 15 / 40.751 Continuing Continuing / 40.751 Continuing Continuing 15 / 40.751 Continuing Continuing / 40.751 Continuing Continuing - - Support (All Modification Items) 2.1) Production Support - / - - / - - / - - / 1.375 - / - - / 1.375 - / 1.685 - / 1.694 - / 1.874 / 2.072 Continuing Continuing 2.2) DSA - / - - / - - / - - / 5.500 - / - - / 5.500 - / 7.019 - / 8.209 - / 9.180 - / 10.052 Continuing Continuing - / 0.000 - / - - / - - / 6.875 - / - - / 6.875 - / 8.704 - / 9.903 - / 11.054 - / 12.124 Continuing Continuing Modification Item 1 of 1: Advanced IW Antennas - / 0.000 / 0.000 - / 0.000 - Subtotal: Installation - / 0.000 Subtotal: Support - Installation - / 0.000 - / - - / - / 0.000 - / - - / - - - / 0.000 - / 24.200 - / 24.708 - / 29.814 - / 32.781 - / 35.861 - / 147.364 / - - / 24.200 - / 24.708 - / 29.814 - / 32.781 - / 35.861 - / 147.364 Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 0.000 0.000 0.000 34.375 0.000 UNCLASSIFIED Page 45 of 49 34.375 60.982 68.490 P-1 Line #47 78.120 85.656 Continuing Continuing Volume 2 - 261 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / Advanced IW Antennas MDAP/MAIS Code: Modification Item 1 of 1: Advanced IW Antennas Manufacturer Information Manufacturer Name: NSMA - AIWA Hardware Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: AIWA Systems Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 24.200 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 24.708 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 13 / 29.814 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 32.781 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 35.861 15 / 35.861 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - Installation Cost 11 / 24.200 11 / 24.708 11 / 24.200 13 / 29.814 11 / 24.708 14 / 32.781 13 / 29.814 - 14 / 32.781 / - - 15 / 35.861 / - 64 / 147.364 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 4 4 3 - 4 4 3 - 4 4 5 - 4 4 6 15 64 Out - - - - - - - - - - - - - - 4 4 4 4 4 4 4 4 21 64 - 3 - 3 - 5 - Footnotes: (17) (1.1.1) Advanced IW Antennas (AIWA) Systems - Prior to FY 2027 budget cycle AIWA program information is contained on P-5 exhibit. FY 2027 is the first year of procurement for AIWA Systems. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 46 of 49 P-1 Line #47 Volume 2 - 262 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / PACFLT UON MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 205.595 - 0.000 - 205.595 - 0.000 - 205.595 0.000 205.595 205.595 205.595 306.663 306.663 306.663 319.097 319.097 319.097 350.301 350.301 350.301 To FY 2031 Complete 357.599 Continuing 357.599 357.599 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: PACFLT UON funding will enable modification of existing Information Warfare programs of record to meet current/future requirements in response to evolving INDOPACOM threats; procurement of systems to meet theater requirements; installation and integration of systems on advanced platforms; and accelerate development of advanced IW technologies to close critical INDOPACOM warfighting gaps. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 47 of 49 P-1 Line #47 Volume 2 - 263 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / PACFLT UON MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: PACFLT UON B Kits Recurring 1.1.1) PACFLT UON Hardware - Organic - (18) Subtotal: Recurring - Subtotal: PACFLT UON Subtotal: Procurement, All Modification Items - / - - / - - / - 24 / 195.720 - / - 24 / 195.720 / 0.000 - / - - / - - / 195.720 - / - - / - - / - - / - 24 / 195.720 - / - 24 / 195.720 / 0.000 - / - - / - - / 195.720 - / - - / 195.720 / 195.720 35 / 291.419 / 291.419 - 35 / 291.419 / 291.419 - 35 / 301.036 / 301.036 - 35 / 301.036 / 301.036 - 38 / 333.376 / 333.376 - 38 / 333.376 / 333.376 - 38 / 340.376 Continuing Continuing / 340.376 Continuing Continuing 38 / 340.376 Continuing Continuing / 340.376 Continuing Continuing - - Support (All Modification Items) 2.1) Production Support Subtotal: Support - / - - / - - / - - / 9.875 - / - - / 9.875 - / 15.244 - / 18.061 - / 16.925 - / 17.223 Continuing Continuing / 0.000 - / - - / - - / 9.875 - / - - / 9.875 - / 15.244 - / 18.061 - / 16.925 - / 17.223 Continuing Continuing / - - / - - / - - / - - / - - 0.000 205.595 0.000 205.595 Installation Subtotal: Installation - / - - / - - / - - / - / - - 357.599 Continuing - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2360 - Shipboard IW Exploit Navy 0.000 0.000 UNCLASSIFIED Page 48 of 49 306.663 319.097 P-1 Line #47 350.301 Continuing Volume 2 - 264 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 P-1 Line Item Number / Title: 2360 / Shipboard IW Exploit ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / PACFLT UON MDAP/MAIS Code: Modification Item 1 of 1: PACFLT UON Manufacturer Information Manufacturer Name: NSMA - PACFLT UON Hardware Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Footnotes: (18) (1.1.1) PACFLT UON - FY 2027 is the first year of procurement for PACFLT UON. Details available at a higher classification. LI 2360 - Shipboard IW Exploit Navy UNCLASSIFIED Page 49 of 49 P-1 Line #47 Volume 2 - 265 === page 346 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 266 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 33.587 4.680 13.008 8.652 0.000 8.652 8.347 8.564 8.902 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 33.587 4.680 13.008 8.652 0.000 8.652 8.347 8.564 8.902 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - Total - 9.083 Continuing - Continuing - 9.083 Continuing - Continuing - - - - - - - - - - - 33.587 4.680 13.008 8.652 0.000 8.652 8.347 8.564 8.902 9.083 Continuing Continuing 2.337 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.888 - 1.288 - 1.288 1.550 0.427 2.516 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding for LI 2900 Maritime Integrated Broadcast Service (MIBS) has been realigned into LI 2361 Automatic Identification System (AIS) as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026. This effort consolidates the existing number of PEs/BLIs identified by BSOs and FMB to group technology projects to allow flexibility that would foster innovation and promote efficiency. PE/BLI consolidation meets the DoW Implementation Plan from the Commission on PPBE Interim Report. 1U030: AIS is required for safety of navigation for all surface ships and submarines. AIS is a maritime Very High Frequency (VHF) communication system, which allows ships to exchange navigation, ship identification, and cargo information machine-to-machine via VHF transponders. AIS provides vessels with the ability to rapidly identify and track commercial shipping, which significantly increases the Navy's ability to distinguish between normal and suspicious merchant ships headed towards United States and allied ports around the globe. AIS provides critical track data to the Common Operational Picture (COP) on surface ships, AN/BYG-1 Combat System on submarines, Global Command and Control System-Maritime (GCCS-M) on Force Level ships, and Global Command and Control System-Joint (GCCS-J) at Fleet Maritime Operations Centers (MOC). The AIS submarine configuration provides an interface to the AN/BYG-1 Combat System and encrypted AIS capability. This capability dramatically improves the Combatant Commanders' situational awareness and Maritime Domain Awareness (MDA) data sharing capabilities in support of regional engagement and tracking efforts against potential maritime terrorism threats. Funds will be used to continue the initial fielding of AIS (V)9 Program of Record systems, their follow-on cyber hardening upgrades, as well as the continuation of surface ship cyber hardening. The AIS submarine variant consists of a combination of government/commercial software, AIS power and navigation subsystem, AIS antenna selector switch, AIS antenna interface unit, AIS data distribution laptop, and AIS terminal data processing unit. The need for AIS systems is especially important for submarines, which have limited maneuverability. The AIS (V)3 and (V)9 Submarine configuration provides situational awareness (to include encrypted AIS message traffic from United States Coast Guard vessels) during time-constrained ascents to communications depth, thereby significantly reducing the risk of a collision. In order to address potential vulnerabilities identified by the Naval Cyber Warfare Development Group (NCWDG) and in compliance with the "Expression of Cyber Requirement for Automatic Identification System" dated 31 Jan 2017, a cybersecurity engineering change will be implemented on all AIS systems in order to protect downstream systems from malformed or anomalous AIS data. Funds are being used to procure and install a new Warship AIS compliant transponder and AIS Terminal Box on all AIS (V)1 equipped surface ships. A new small form factor AIS workstation will be procured and installed on ForceLevel ships equipped with AIS (V)2 systems. This has already been installed at Fleet HQ MOCs equipped with AIS (V)5 systems. New AIS laptops and Warship AIS compatible transponders will be procured and installed on all submarines equipped with an AIS (V)3 or AIS (V)9 Program of Record system. The above hardware configuration changes are required to implement software and firmware modifications that will detect, log, and filter all incoming AIS data from unverified sources, alert operators to the presence of anomalous AIS data and protect systems and users of AIS data downstream from the data collection point. These users include GCCS-M, GCCS-J, Distributed Common Ground System - Navy (DCGS-N), Electronic Chart Display and Information System - Navy (ECDIS-N), BYG-1, and others. LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 1 of 6 P-1 Line #48 Volume 2 - 267 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A DH530: The MIBS program delivers Integrated Broadcast Service (IBS) data to operational and tactical decision makers aboard United States Navy surface ships, shore headquarters, and other joint platforms. MIBS provides the Navy with the capability to receive and deliver near real time, Over the Air (OTA) IBS data, enhancing the Common Operation Picture (COP) supporting operations in all warfare areas, including Ballistic Missile Defense (BMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASUW), Undersea Warfare (UW), Electronic Warfare (EW) and track location of red and blue forces to warfighters at the tactical edge, regardless of Emission Control (EMCON) posture. MIBS provides essential support to the Over the Horizon-Targeting (OTH-T) mission and supports closure of the kill chain in a denied environment. This budget will provide a technical refresh of the Joint Tactical Terminal - Maritime (JTT-M) systems. The Joint Tactical Terminal - Maritime Evolved (JTT-ME) system replaces an End of Life (EoL) JTTSenior terminals and infrastructure with a modern, secure, network enabled infrastructure that allows flexibility for future radios/waveforms. This system is formally specified by Fleet Commanders as a threshold capability for global Maritime Command, Control and Communications in a Distributed Maritime Environment to execute current Warfighting plans and is required for National Command and Control capability. The MIBS program will replace the End of Life (EoL) JTT-Senior radio (JTT-M) that has been in sustainment for 20+ years. [P40A / Joint Tactical Terminal - Maritime Evolved (JTT-ME)]: All associated procurement and support costs associated MIBS program starting in FY2026 represent a realignment from LI 2900 to LI 2361 as part of the Other Procurement, Navy Line Item-Consolidation starting in FY2026. DH530: The Maritime Integrated Broadcast Service (MIBS) program delivers Integrated Broadcast Service (IBS) data to operational and tactical decision makers aboard United States Navy surface ships, shore headquarters, and other joint platforms. MIBS provides the Navy with the capability to receive and deliver near real time, Over the Air (OTA) IBS data, enhancing the Common Operation Picture (COP) supporting operations in all warfare areas. Including Ballistic Missile Defense (BMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASUW), Undersea Warfare (UW), Electronic Warfare (EW) and track location of red and blue forces to warfighters at the tactical edge, regardless of Emission Control (EMCON) posture. MIBS provides essential support to the Over the Horizon-Targeting (OTH-T) mission and supports closure of the kill chain in a denied environment. This budget will provide a technical refresh of the JTT-M (Joint Tactical Terminal - Maritime) systems. The Joint Tactical Terminal - Maritime Evolved (JTT-ME) system replaces an End of Life (EoL) JTTSenior terminals and infrastructure with a modern, secure, network enabled infrastructure that allows flexibility for future radios/waveforms. This system is formally specified by Fleet Commanders as a threshold capability for global Maritime Command, Control and Communications in a Distributed Maritime Environment to execute current Warfighting plans and is required for National Command and Control capability. The MIBS program will replace the End of Life (EoL) JTT-Senior radio (JTT-M) that has been in sustainment for 20+ years. LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 2 of 6 P-1 Line #48 Volume 2 - 268 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 5: Reconnaissance Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a AIS & JTT-ME P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 33.587 - / 4.680 - / 13.008 - / 8.652 - / 33.587 - / 4.680 - / 13.008 - / 8.652 - / - - / 8.652 / 0.000 - / 8.652 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget will procure the following: P40A: Automatic Identification System (AIS): - (5) Cyber Security Hardware Tech Refresh - (2) AIS Virginia Class Submarines (SSN) - Decrease in funding for AIS upgrades from FY 2026 to FY 2027 is in alignment with the current Navy fielding plan for AIS. P40A: Maritime Integrated Broadcast Service (MIBS): - (8) Joint Tactical Terminal - Maritime Evolved (JTT-ME) systems that will replace JTT-M terminals in obsolescence in order to meet the National Security Agency (NSA) mandate in alignment with security requirements. - The decrease in funding from FY 2026 to FY 2027 is due to installing less JTT-ME systems in alignment with the fielding plan. LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 3 of 6 P-1 Line #48 Volume 2 - 269 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: AIS & JTT-ME ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) 1U030 Automatic Identification Systems (AIS) 1.1) AIS Cyber Security Hardware Tech Refresh A (1)(†) 1.2) AIS Procurement - Ohio Class Submarines (SSBN) A (†) 1.3) AIS Procurement - Virginia Class Submarines (SSN) - - - 65.000 13 0.845 66.300 10 0.663 67.600 - - - - - - 133.000 1 0.133 - - - - 0.234 239.000 1 0.239 - - 0.000 - - 1.079 5 - 0.338 - - - 67.600 - - - - - 0.486 - - - 0.824 - - - 1.705 - - - 5 - 0.338 - A 234.000 1 243.000 2 243.000 2 0.486 (2)(†) Subtotal: 1) 1U030 Automatic Identification Systems (AIS) - - 1.035 10 2.091 - - - - 0.824 2) DH530 Joint Tactical Terminal - Maritime Evolved (JTT-ME) 2.1) Joint Tactical Terminal - Maritime Evolved (JTT-ME) A - - - - - - 209.100 213.180 8 213.180 8 1.705 - - 0.000 - - - - - 2.091 - - 1.705 - - - - - 1.705 - - 7.007 - - 1.449 - - 0.459 - - 0.936 - - - - - 0.936 - - 7.919 - - 1.430 - - 1.989 - - 1.499 - - - - - 1.499 - - 1.587 - - 0.050 - - 0.102 - - 0.104 - - - - - 0.104 - - 1.026 - - 0.607 - - 0.589 - - 0.243 - - - - - 0.243 - - - - - - - - 6.127 - - 2.931 - - - - - 2.931 - - - - - - - - 0.429 - - 0.257 - - - - - 0.257 - - 17.539 - - 3.536 - - 9.695 - - 5.970 - - - - - 5.970 - - 1.544 - - 0.065 - - 0.062 - - 0.050 - - - - - 0.050 - - - - - - - - 0.125 - - 0.103 - - - - - 0.103 - - 1.544 - - 0.065 - - 0.187 - - 0.153 - - - - - 0.153 (3)(†) Subtotal: 2) DH530 Joint Tactical Terminal - Maritime Evolved (JTTME) 3) Installations 3.1) AIS - Installation A 3.2) AIS Cyber Security Hardware - A (4) Installation (5) 3.3) AIS - DSA A 3.4) AIS Cyber Security Hardware - A DSA (6) 3.5) JTT-ME Installations A (7) 3.6) JTT-ME DSA (8) A Subtotal: 3) Installations 4) Support 4.1) AIS Production Support A 4.2) JTT-ME Production Support A Subtotal: 4) Support 5) Consolidated Prior Year Requirements (9) LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 4 of 6 P-1 Line #48 Volume 2 - 270 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.1) Consolidated Prior Year Requirements A MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($ K) Qty (Each) - - 14.504 - - Subtotal: 5) Consolidated Prior Year Requirements - - 14.504 - Total - - 33.587 - FY 2026 Total Cost ($ M) ($ K) Qty (Each) - - - - - - - 4.680 - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Unit Cost Aggregated Items Title: AIS & JTT-ME FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) - - - - - - - 13.008 - FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - - - - - - - - - - - - - - - - 8.652 - - - - - 8.652 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) 1.1) AIS Cyber Security Hardware - Tech Refresh: Units from FY 2026 to FY 2027 align with fielding plan and procures AIS (V)1/2 critical cyber hardening upgrades for surface ships. 1.3) AIS - Procurement - Virginia Class Submarines (SSN): Units from FY 2026 to FY 2027 align with fielding plan and procure AIS (V)9 units for Fleet requirements. 2.1) Joint Tactical Terminal - Maritime Evolved (JTT-ME): Procurements from FY 2026 to FY 2027 are in alignment with the current fielding plan. 3.1) AIS - Installation: Increase from FY 2026 to FY 2027 is attributed to additional installations in alignment with the current fielding plan. 3.2) AIS Cyber Security Hardware - Installation: Decrease from FY 2026 to FY 2027 is attributed to less installations in alignment with the current fielding plan. 3.4) AIS Cyber Security Hardware - DSA: Decrease from FY 2026 to FY 2027 is attributed to less installations in alignment with the current fielding plan. 3.5) JTT-ME Installations: Decrease from FY 2026 to FY 2027 is due to the installation of (10) less systems procured in the previous budget cycle. Installations are funded the following FY due to 12-month lead times. 3.6) JTT-ME DSA: Decrease from FY 2026 to FY 2027 is due to the installation of (10) less systems procured in the previous budget cycle and are in alignment with the current fielding plan. Consolidated Prior Year Requirements includes: Engineering Change Proposals (ECPs), Transponders, Combat Workstations, AIS Procurement, AIS Cyber Security Hardware Procurement and associated installation costs. LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 5 of 6 P-1 Line #48 Volume 2 - 271 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 5 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2361 / Maritime Battlespace Awareness Contractor and Location Method/Type or Funding Vehicle 2025 SRC / Atlanta, GA 2026 Aggregated Items: AIS & JTT-ME Location of PCO Award Date Date of First Delivery C / CPFF NIWC - Atlantic Dec 2024 Jun 2025 13 65.000 Y SRC / Atlanta, GA C / CPFF NIWC - Atlantic Dec 2025 Jun 2026 10 66.300 Y 2027 SRC / Atlanta, GA C / CPFF NIWC - Atlantic Dec 2026 Jun 2027 5 67.600 Y 2026 SRC / Atlanta, GA C / CPFF NIWC - Atlantic Nov 2025 Sep 2026 1 133.000 Y 2025 SRC / Atlanta, GA C / CPFF NIWC - Atlantic Nov 2024 Sep 2025 1 234.000 Y 2026 SRC / Atlanta, GA C / CPFF NIWC - Atlantic Nov 2025 Sep 2026 1 239.000 Y 2027 SRC / Atlanta, GA C / CPFF NIWC - Atlantic Nov 2026 Sep 2027 2 243.000 Y 2026 L3Harris Technologies / San Diego, CA C / CPFF San Diego, CA Jan 2026 Jan 2027 10 209.100 Y 2027 L3Harris Technologies / San Diego, CA C / CPFF San Diego, CA Jan 2027 Jan 2028 8 213.180 Y FY Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 1) 1U030 Automatic Identification Systems (AIS) 1.1) AIS Cyber Security Hardware Tech Refresh (1) 1.1) AIS Cyber Security Hardware Tech Refresh (1) 1.1) AIS Cyber Security Hardware Tech Refresh (1) 1.2) AIS Procurement - Ohio Class Submarines (SSBN) 1.3) AIS Procurement - Virginia Class Submarines (SSN) (2) 1.3) AIS Procurement - Virginia Class Submarines (SSN) (2) 1.3) AIS Procurement - Virginia Class Submarines (SSN) (2) 2) DH530 Joint Tactical Terminal - Maritime Evolved (JTT-ME) 2.1) Joint Tactical Terminal Maritime Evolved (JTT-ME) (3) 2.1) Joint Tactical Terminal Maritime Evolved (JTT-ME) (3) LI 2361 - Maritime Battlespace Awareness Navy UNCLASSIFIED Page 6 of 6 P-1 Line #48 Volume 2 - 272 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Program Elements for Code B Items: 0607658N, 0603658N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,041.902 1,041.902 1,041.902 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 26.644 26.648 33.932 0.000 33.932 26.338 27.953 27.469 - - - - - - - - 26.644 26.648 33.932 0.000 33.932 26.338 27.953 27.469 To FY 2031 Complete - Total - 28.009 Continuing - Continuing - 28.009 Continuing - Continuing - - - - - - - - - - 26.644 26.648 33.932 0.000 33.932 26.338 27.953 27.469 28.009 Continuing Continuing 4.469 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 60.158 - 1.304 - 1.304 20.938 5.500 4.813 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Cooperative Engagement Capability (CEC) significantly improves Battle Force Anti-Air Warfare (AAW) capability by coordinating all Battle Force AAW sensors into a single, real-time, composite track picture capable of fire control quality. CEC distributes sensor data from each ship and aircraft, or cooperating unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data rate sensor and engagement data distribution network. CEC is highly resistant to jamming and provides accurate gridlocking between CUs. Each CU independently employs high capacity, parallel processing and advanced algorithms to combine all distributed sensor data into a fire control quality track picture which is the same for all CUs. CEC data is presented as a superset of the best AAW sensor capabilities from each CU; all of which are integrated into a single input to each CU's combat weapons system. CEC significantly improves Battle Force defense in depth, including both local area and ship defense capabilities against current and future AAW threats. Moreover, CEC provides critical connectivity and integration of over-land air defense systems capable of countering emerging air threats, including land attack cruise missiles, in a complex littoral environment. CEC consists of the Data Distribution System (DDS), the Cooperative Engagement Processor (CEP), and Combat System modifications. The DDS encodes and distributes ownship sensor and engagement data and is a high capacity, jam resistant, directive system providing a precision gridlocking and high throughput of data. The CEP is a high capacity distributed processor that is able to process force levels of data in near real time. This data is passed to the ship's combat system as high quality data for which the ship can cue its onboard sensors or use the data to engage targets without actually tracking them. The CEC suite contains a C-Band antenna, the antenna's power and cooling equipment, a Signal Data Processor (SDP), and system support equipment. The current CEC Shipboard antenna variants include the Shipboard Active Aperture (SBAA) and the Planar Array Antenna Assembly (PAAA). The SDP hosts the CEP software and is common across all CEC variants. The USG-2B articles in this budget procure support hardware consisting of a ruggedized 19-inch rack that contains a Cesium time standard, input/output converter, power distribution and user interface control devices. The 19-inch rack holds the SDP. SBAA and PAAA support are provided by an Antenna Environmental Control Unit (AECU) or Environmental Control System Controller (ECSC), which provide power and cooling oil to the CEC shipboard antenna. Funding provided also procures the required Weapon Replaceable Assembly (WRA) hardware required for airborne variants of CEC. CEC is planned for shipboard installations at various Naval and commercial shipyards aboard CG/CG Mod, DDG/DDG Mod, CV/CVN, LPD, LHD, DDG 1000, and LHA ship classes during scheduled ship availability periods and at land based test sites (LBTS). [P40A / UC002 - AN/UYQ-70 DISPLAY]: This is a sunk cost to fund the procurement of the AN/UYQ-70 display system for use and integration with the CEC system. [P40A / UC004 - ECP/KIT PROCUREMENT]: These funds are for the procurement and installation of Engineering Change Proposals (ECPs)(AN/USG-2 to AN/USG-2B upgrades/AN/USG-2A to AN/USG-2B upgrades) Field Change Kits to address CEC parts obsolescence associated with interfacing systems on multiple platforms. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 1 of 17 P-1 Line #49 Volume 2 - 273 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Program Elements for Code B Items: 0607658N, 0603658N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / UC005 - NON-RECURRING DEPOT COST]: This is a sunk cost to establish a depot for the CEC system. [P40A / UC006 - VISUAL INTERACTIVE SIMULATED TRAINING APPLICATION (VISTA) TRAINING]: This is a sunk cost to fund VISTA training related to the CEC system. [P40A / UC008 - SUPPLY SUPPORT]: This is a sunk cost for Supply Support for the CEC system. [P40A / UC011 - SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS)]: Funds are for the procurement of Signal Data Processors (SDP) backfits at Land Based Test Sites (LBTSs). There are no installation costs associated with these procurements because the installations will be performed by employees at the LBTSs. [P40A / UC013 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2)]: Funds are for the procurement of AN/USG-2B hardware conversion kits for the CEC AN/USG-2 system configuration. [P40A / UC014 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2A)]: Funds are for the procurement of AN/USG-2B hardware conversion kits for the AN/USG-2A CEC system configuration. [P40A / UC015 - AN/USG-2B HARDWARE CONVERSION KITS (LBTS)]: Funds are for the procurement of AN/USG-2B hardware conversion kits for CEC LBTS. [P40A / UC830 - PRODUCTION ENGR. SUPPORT]: These funds are required for the production engineering support of all CEC systems. This Cost Element includes indirect costs associated with the procurement and installation of individual field changes and upgrades. These costs would include field change and upgrade support, consolidated engineering support, Program Office support, and other costs. These costs will fluctuate with increases and decreases of overall budget, number and type of field changes and upgrades, and required support. [P40A / UCCA1 - CONGRESSIONAL ADD]: These are Congressional add funds. [P40A / UC016 SYSTEM COMPONENT UPGRADES]: These funds are for the procurement and installation of replacement CEC system components (Surface and Airborne) due to existing component degradation and corrosion as a result of these existing components being in use beyond their intended service life. Funds will support procurement of Environmental Control System Controllers (ECSC) Units and replacement ECSC components, Antenna Environmental Control Units (AECU) and replacement AECU components, Airborne Weapons Replaceable Assemblies (WRAs), replacement components of the Shipboard Active Array (SBAA) Antenna, and replacement components of the Planar Array Antenna Assembly (PAAA) Antenna [P40A / UC017 SIGNAL DATA PROCESSORS (SDP) CAPABILITY ENHANCEMENT]: The Cooperative Engagement Capability (CEC) Signal Data Processor (SDP) will be modernized to support future CEC capabilities including CEC Enhanced Network, NIFC Passive, and integration of Office of Naval Research's (ONR) Communications and Interoperability for Integrated Fires (CIIF) Mission-based Networking for DDS (MiND) and Communications as a Service (CaaS) FNC products. These future CEC capabilities are required by the CEC Increment 2 Capability Description Document (CDD) signed by the Vice Chief of Naval Operations (VCNO) on 26 June 2019 and approved by the Joint Capabilities Board (JCB) on 18 March 2020. This effort procures the quantities necessary to upgrade existing SDPs that will include Crypto Mod, New Transmit and Receive Cards, and CEN Firmware. Unit costs and resulting procurement quantities have been updated in FY26 to align to latest production contract firm fixed pricing. [P40A / UC009 - SDP BACKFITS (AN/USG-2) Prior Year Historical]: P3A Prior Year Historical: Strike Group Anti-Air Warfare (AAW) Improvement. Funds are for the procurement of Signal Data Processors (SDP) backfits in alignment with Fleet Modernization Procurement and Installation Plan for CEC Backfit to CG, DDG, CVN, and LHD ship classes. [P40A / UC010 - SDP BACKFITS (AN/USG-2A) Prior Year Historical]: P3A Prior Year Historical: Strike Group Anti-Air Warfare (AAW) Improvement. Funds are for the procurement of Signal Data Processors (SDP) backfits for AN/USG-2A equipment in alignment with Fleet Modernization Procurement and Installation Plan for CEC Backfit to CG, DDG, CVN, and LHD ship classes. [P3A / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B)]: These funds are for the procurement of CEC to backfit CG, DDG, CVN, and LHD ship classes, as well as LBTSs. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 2 of 17 P-1 Line #49 Volume 2 - 274 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Program Elements for Code B Items: 0607658N, 0603658N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P3A - 2 / UC003 - PAAA BACKFIT KITS]: These funds are for the procurement of Planar Antenna Array Assembly (PAAA) backfit kits. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 3 of 17 P-1 Line #49 Volume 2 - 275 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Program Elements for Code B Items: 0607658N, 0603658N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a COOPERATIVE ENGAGEMENT CAPABILITY - / 462.092 P-3a 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) (SGAAW) P-5a - / 469.604 P-3a 2 / UC003 - PAAA BACKFIT KITS (SGAAW) - / 110.206 P-40 Total Gross/Weapon System Cost / 1,041.902 - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 14.545 - / 23.558 - / 20.626 - / 0.000 - / 0.000 - / 11.617 - / 12.099 - / 3.090 - / 1.689 / 26.644 - / 26.648 - / 33.932 - / - - / 20.626 - / 0.000 - / 11.617 - / 0.000 - / 1.689 - / 0.000 - / 33.932 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a COOPERATIVE ENGAGEMENT CAPABILITY P-3a 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) (SGAAW) P-5a - / - - / - - / - - / - - / - - / 0.200 - / 1.400 - / 0.000 - / 0.000 - P-3a 2 / UC003 - PAAA BACKFIT KITS (SGAAW) - / 8.316 - / 8.714 - / 10.082 - / 14.697 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 26.338 - / 27.953 - / 27.469 - / 28.009 Continuing Continuing / 0.000 - / / 482.821 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funds are to procure hardware and provide associated support for the CEC system. Requirements are driven by planned procurements of Planar Array Antenna Assembly (PAAA), USG-2B ECP/Kits, System Component Upgrades (AECUs, ECSCs, WRAs, Replacement components for SBAA and PAAA antennas), Procurement/Installation of CEC Systems, Installation of Signal Data Processor (SDP) back-fit kits, and Procurement of Signal Data Processor (SDP) Capability Enhancements (No associated installation cost) in alignment with ship modernization programs. FY 2027 increase is required for procurement of 2 CEC Systems to support operations and sustainment for the USS Barry (DDG 52) and USS John Paul Jones (DDG 53) as part of the DDG-51 Service Life Extension Program. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 4 of 17 P-1 Line #49 Volume 2 - 276 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: COOPERATIVE ENGAGEMENT CAPABILITY FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) UC002 - AN/UYQ-70 DISPLAY 1.1) AN/UYQ-70 DISPLAY A Subtotal: 1) UC002 - AN/UYQ-70 DISPLAY - - 21.493 - - - - - - - - - - - - - - - - - 21.493 - - - - - - - - - - - - - - - - - 144.176 - - 4.952 - - 5.302 - - 4.297 - - - - - 4.297 - - 144.176 - - 4.952 - - 5.302 - - 4.297 - - - - - 4.297 - - 4.500 - - - - - - - - - - - - - - - - - 4.500 - - - - - - - - - - - - - - - 2) UC004 - ECP/KIT PROCUREMENT 2.1) ECP/KIT PROCUREMENT A Subtotal: 2) UC004 - ECP/KIT PROCUREMENT 3) UC005 - NON-RECURRING DEPOT COST 3.1) NONRECURRING DEPOT SUPPORT A Subtotal: 3) UC005 - NONRECURRING DEPOT COST 4) UC006 - VISUAL INTERACTIVE SIMULATED TRAINING APPLICATION (VISTA) TRAINING 4.1) VISUAL INTERACTIVE SIMULATED TRAINING APPLICATION (VISTA) TRAINING A Subtotal: 4) UC006 - VISUAL INTERACTIVE SIMULATED TRAINING APPLICATION (VISTA) TRAINING - - 0.700 - - - - - - - - - - - - - - - - - 0.700 - - - - - - - - - - - - - - - - - 6.094 - - - - - - - - - - - - - - - - - 6.094 - - - - - - - - - - - - - - - 25 8.088 - - - - - - - - - - - - - - - - 8.088 - - - - - - - - - - - - - - - 12.673 - - - - - - - - - - - - - - - 5) UC008 - SUPPLY SUPPORT 5.1) SUPPLY SUPPORT A Subtotal: 5) UC008 - SUPPLY SUPPORT 6) UC011 - SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) 6.1) SIGNAL DATA PROCESSORS (SDP) BACKFITS A 323,520.00 (†) (LBTS) Subtotal: 6) UC011 - SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) - 7) UC013 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) 7.1) AN/USG-2B HARDWARE A 372,735.29 34 LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 5 of 17 P-1 Line #49 Volume 2 - 277 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] CONVERSION KITS (AN/USG-2) ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: COOPERATIVE ENGAGEMENT CAPABILITY FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (†) Subtotal: 7) UC013 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) - - 12.673 - - - - - - - - - - - - - - - 8) UC014 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2A) 8.1) AN/USG-2B HARDWARE CONVERSION KIT A 279,375.00 16 4.470 - - - - - - - - - - - - - - - - 4.470 - - - - - - - - - - - - - - - 17 6.623 - - - - - - - - - - - - - - - - - 6.623 - - - - - - - - - - - - - - - - - 129.285 - - 4.952 - - 5.300 - - 4.296 - - - - - 4.296 - - 129.285 - - 4.952 - - 5.300 - - 4.296 - - - - - 4.296 - - 23.249 - - - - - - - - - - - - - - - - - 23.249 - - - - - - - - - - - - - - - - - 14.290 - - - - - - - - - - - - - - - - - 14.290 - - - - - - - - - - - - - - - - - 13.983 - - 0.541 - - 4.310 - - 3.227 - - - - - 3.227 - - 13.983 - - 0.541 - - 4.310 - - 3.227 - - - - - 3.227 (†) (AN/USG-2A) Subtotal: 8) UC014 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2A) - 9) UC015 - AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 9.1) AN/USG-2B HARDWARE CONVERSION KITS A 389,588.24 (†) (LBTS) Subtotal: 9) UC015 - AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 10) UC830 - PRODUCTION ENGR. SUPPORT 10.1) PRODUCTION ENGR. SUPPORT (1) A Subtotal: 10) UC830 - PRODUCTION ENGR. SUPPORT 11) UCCA1 - CONGRESSIONAL ADD 11.1) CONGRESSIONAL ADD A Subtotal: 11) UCCA1 CONGRESSIONAL ADD 12) UC6IN - NON-FMP INSTALLATION 12.1) NON-FMP INSTALLATION A Subtotal: 12) UC6IN - NON-FMP INSTALLATION 13) UC016 SYSTEM COMPONENT UPGRADES 13.1) SYSTEM COMPONENT UPGRADES A (2) Subtotal: 13) UC016 SYSTEM COMPONENT UPGRADES LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 6 of 17 P-1 Line #49 Volume 2 - 278 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: COOPERATIVE ENGAGEMENT CAPABILITY Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 14) UC017 SIGNAL DATA PROCESSORS (SDP) CAPABILITY ENHANCEMENT 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY A 63 11.800 195,238.10 21 4.100 432,288.00 20 8.646 440,280.00 20 8.806 - - - - - 11.800 - - 4.100 - - 8.646 - - 8.806 - - - - - 43.950 - - - - - - - - - - - - - 16.718 - - - - - - - - - - Subtotal: 15) UC COMPLETED P3As - - 60.668 - - - - - - - - - Total - - 462.092 - - 14.545 - - 23.558 - - 20.626 ENHANCEMENT 187,301.59 440,280.00 20 8.806 - - 8.806 - - - - - - - - - - - - - - - - - - - - 20.626 (3)(†) Subtotal: 14) UC017 SIGNAL DATA PROCESSORS (SDP) CAPABILITY ENHANCEMENT 15) UC COMPLETED P3As 15.1) UC009 - SDP BACKFITS (AN/ USG-2) Prior Year Historical A 15.2) UC010 - SDP BACKFITS (AN/ USG-2A) Prior Year Historical A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) These funds are required for the production engineering support of all CEC systems. This Cost Element includes indirect costs associated with the procurement and installation of individual field changes and upgrades. These costs would include field change and upgrade support, consolidated engineering support, Program Office support, and other costs. These costs will fluctuate with increases and decreases of overall budget, number and type of field changes and upgrades, and required support. (2) Continued funding is required in FY 2027 - FY 3031 to support replacement of failing Antenna Environmental Control Units (AECUs) with Environmental Control System Controllers (ECSCs) to increase fleet Operational Availability (Ao) in accordance with the CEC Capability Production Document (CPD). AECU failure is a major contributor to decreased Operational Availability. (3) The Cooperative Engagement Capability (CEC) Signal Data Processor (SDP) will be modernized to support future CEC capabilities including CEC Enhanced Network, NIFC Passive, and integration of Office of Naval Research's (ONR) Communications and Interoperability for Integrated Fires (CIIF) Mission-based Networking for DDS (MiND) and Communications as a Service (CaaS) FNC products. These future CEC capabilities are required by the CEC Increment 2 Capability Description Document (CDD) signed by the Vice Chief of Naval Operations (VCNO) on 26 June 2019 and approved by the Joint Capabilities Board (JCB) on 18 March 2020. This effort procures the quantities necessary to upgrade existing SDPs that will include Crypto Mod, New Transmit and Receive Cards, and CEN Firmware. This effort is to procure the Enhanced Capability SDPs and does not have associated installation costs at this time. Unit costs and resulting procurement quantities have been updated starting in FY26 to align to latest production contract firm fixed pricing. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 7 of 17 P-1 Line #49 Volume 2 - 279 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Method/Type or Funding Vehicle DRS Laurel Technologies / Largo, FL Contractor and Location Aggregated Items: COOPERATIVE ENGAGEMENT CAPABILITY Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) SS / FFP Washington, DC May 2018 Nov 2019 5 231,697.00 Y Qty (Each) RFP Issue Date 6) UC011 - SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) 6.1) SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) 2018 6.1) SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) 2019 (4) DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC May 2019 May 2020 1 236,331.00 Y 6.1) SIGNAL DATA PROCESSORS (SDP) BACKFITS (LBTS) 2020 (5) DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC May 2020 May 2021 4 241,058.00 Y 7) UC013 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) 7.1) AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) 2018 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2018 May 2019 3 391,600.00 Y 7.1) AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) 2019 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2019 Mar 2020 9 399,545.00 Y 7.1) AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2) 2020 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2020 Mar 2021 3 407,536.00 Y DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2018 May 2019 1 299,000.00 Y 8) UC014 - AN/USG-2B HARDWARE CONVERSION KITS (AN/USG-2A) 8.1) AN/USG-2B HARDWARE CONVERSION KIT (AN/USG-2A) 2018 8.1) AN/USG-2B HARDWARE CONVERSION KIT (AN/USG-2A) 2019 (6) DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2019 Mar 2020 1 304,837.00 Y 8.1) AN/USG-2B HARDWARE CONVERSION KIT (AN/USG-2A) 2020 (7) DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2020 Mar 2021 2 314,200.00 Y 9) UC015 - AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 9.1) AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 2018 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2018 May 2019 5 394,300.00 Y 9.1) AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 2019 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2019 Mar 2020 1 402,124.00 Y 9.1) AN/USG-2B HARDWARE CONVERSION KITS (LBTS) 2020 DRS Laurel Technologies / Largo, FL SS / FFP Washington, DC Mar 2020 Mar 2021 4 410,000.00 Y L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Apr 2022 Apr 2023 21 185,714.29 Y L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Oct 2022 Oct 2023 21 185,714.29 Y 14) UC017 SIGNAL DATA PROCESSORS (SDP) CAPABILITY ENHANCEMENT 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) 2022 (8) 2023 LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 8 of 17 P-1 Line #49 Volume 2 - 280 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Item Number / Title [DODIC] 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) 14.1) SIGNAL DATA PROCESSORS (SDP) CAPABILIY ENHANCEMENT (3) O O C P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Aggregated Items: COOPERATIVE ENGAGEMENT CAPABILITY FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2024 L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Oct 2023 Oct 2024 21 190,476.19 Y 2025 L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Oct 2024 Oct 2025 21 195,238.10 Y 2026 L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Oct 2025 Oct 2026 20 432,288.00 Y 2027 L3 Technologies Inc. / Largo, FL C / FFP Washington, DC Oct 2026 Oct 2027 20 440,280.00 Y Qty (Each) RFP Issue Date Footnotes: (4) (5) (6) (7) (8) 2019 - Option Year 2 of DRS SDP-S Contract 2020 - Option Year 3 of DRS SDP-S Contract 2019 - Option Year 4 of DRS Production Contract 2020 - Option Year 5 of DRS Production Contract This is a competitively awarded contract (Q3 FY22) with options in FY23-FY26. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 9 of 17 P-1 Line #49 Volume 2 - 281 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) MDAP/MAIS Code: Prior Years 469.604 469.604 469.604 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 11.617 0.000 11.617 0.200 1.400 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 11.617 0.000 11.617 0.200 1.400 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 11.617 0.000 11.617 0.200 1.400 0.000 0.000 0.000 Total 482.821 482.821 482.821 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are for the procurement and installation of CEC to backfit CG, DDG, CVN, and LHD ship classes, as well as various Land Based Test Sites (LBTSs) LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 10 of 17 P-1 Line #49 Volume 2 - 282 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) MDAP/MAIS Code: Related RDT&E PEs: 0603755N, 0603658N Models of Systems Affected: UC001 COOPERATIVE Modification Type: SGAAW ENGAGEMENT TRANSMISSION PROCESSING SET (CETPS) (AN/USG-2/2A/2B) Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) B Kits Recurring 1.1.1) COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) NonOrganic 52 / 384.035 - / - - / - 2 / 11.617 - / - 2 / 11.617 - / - - / - - / - - / - - / - 54 / 395.652 (9) Subtotal: Recurring Subtotal: UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) Subtotal: Procurement, All Modification Items / 384.035 - / - - / - 52 / 384.035 - / - - / - / 384.035 - / - - / - - - / 11.617 - / - 2 / 11.617 - / - / 11.617 - / - - - / 11.617 - / - - / - - / - - / - 2 / 11.617 - / - - / - - / - - / - / 11.617 - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 87.169 / - - / 0.000 - / 87.169 - - / 0.000 - / - / 395.652 - 54 / 395.652 / 395.652 - Installation Modification Item 1 of 1: UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) - / 85.569 Subtotal: Installation - / 85.569 - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - - / 0.000 - / 0.200 - / 1.400 / - - / 0.200 - / 1.400 - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 2606 - Cooperative Engagement Capability Navy 469.604 0.000 0.000 11.617 0.000 UNCLASSIFIED Page 11 of 17 11.617 0.200 1.400 P-1 Line #49 0.000 0.000 0.000 482.821 Volume 2 - 283 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) MDAP/MAIS Code: Modification Item 1 of 1: UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) Manufacturer Information Manufacturer Name: L3Harris Technologies Manufacturer Location: Various Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2027 Delivery Dates Sep 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: ALTERATION INSTALLATION TEAM (AIT):: Installation Name: COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSI Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 52 / 85.569 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 52 / 85.569 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 0 / 0.200 2 / 1.400 - / - - / - 0 / 0.000 2 / 1.600 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.200 2 / 1.400 - / - - / - 0 / 0.000 Total 52 / 85.569 54 / 87.169 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 52 - - - - - - - - - - - - - - - - - 1 1 - - - - - - - - - - 54 Out 52 - - - - - - - - - - - - - - - - - 1 1 - - - - - - - - - - 54 Footnotes: LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 12 of 17 P-1 Line #49 Volume 2 - 284 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / UC001 - COOPERATIVE ENGAGEMENT TRANSMISSION PROCESSING SET (USG-2/2A/2B) MDAP/MAIS Code: (9) Funding is programmed to support the operations and sustainment across the current FYDP (FY27-FY31) for the USS Barry (DDG 52) and USS John Paul Jones (DDG 53) in accordance with DDG-51 Service Life Extension Program (SLEP). The SLEP is aligned to ship schedules. The ship availabilities required to sustain these ships were scheduled in FY27 in order to balance operational requirements with sustainment requirements. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 13 of 17 P-1 Line #49 Volume 2 - 285 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / UC003 - PAAA BACKFIT KITS MDAP/MAIS Code: Prior Years 110.206 110.206 110.206 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 12.099 3.090 1.689 0.000 1.689 8.316 8.714 10.082 - - - - - - - - 12.099 3.090 1.689 0.000 1.689 8.316 8.714 10.082 - - - - - - - - 12.099 3.090 1.689 0.000 1.689 8.316 8.714 10.082 To FY 2031 Complete 14.697 Continuing - Continuing - 14.697 Continuing - Total - Continuing - - 14.697 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are for the procurement of Planar Antenna Array Assembly (PAAA) backfit kits. [PAAA BACKFIT KITS] The Planar Antenna Array Assembly (PAAA) antenna replaces the older Shipboard Active Aperture (SBAA) antenna currently in the Fleet. PAAA Backfit Kits are installed on CG, DDG, CVN, LPD, and LHD ship classes. FY2026 Production quantities have reduced to 0 in order to redesign and resolve known PAAA obsolescence issues via Other Transaction Authority contract. FY2027 Production quantities have reduced to 0 due to reductions in funding. The new PAAA antennas starting in FY2028 have a higher unit cost than the legacy PAAA antennas in FY26 and previous years. This is because the modern hardware selected to meet PAAA requirements is more expensive than the legacy PAAA hardware that is no longer able to be procured. The Navy must procure the new PAAA antenna because the legacy PAAA antenna is no longer able to be procured, yet the Navy continues to have a PAAA requirement. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 14 of 17 P-1 Line #49 Volume 2 - 286 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UC003 - PAAA BACKFIT KITS MDAP/MAIS Code: Related RDT&E PEs: 0603755N, 0603658N Models of Systems Affected: UC003 PAAA BACKFIT Modification Type: SGAAW KITS Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: UC003 - PAAA BACKFIT KITS B Kits Non-Recurring 1.1.1) PAAA BACKFIT KITS - NonOrganic Subtotal: Non-Recurring Subtotal: UC003 - PAAA BACKFIT KITS Subtotal: Procurement, All Modification Items 26 / 84.458 - / 84.458 - 26 / 84.458 3 / 9.936 - / - - / - - / - - / - / 9.936 - / - - / - - / - - / - 3 / 9.936 - / - - / - - / - - / - - / - - / - - / - - / - - - - / 84.458 - / 9.936 Modification Item 1 of 1: UC003 - PAAA BACKFIT KITS - / 25.748 - / 2.163 - / 3.090 - / 1.689 Subtotal: Installation - / 25.748 - / 2.163 - / 3.090 - / 1.689 2 / 8.316 / 8.316 - 2 / 8.482 - 2 / 8.316 / 8.482 2 / 8.652 - 2 / 8.482 / 8.652 3 / 13.239 Continuing Continuing / 13.239 Continuing Continuing 3 / 13.239 Continuing Continuing / 13.239 Continuing Continuing - 2 / 8.652 / 8.316 - / 8.482 - / 8.652 / 0.000 - / 0.232 - / 1.430 - / 1.458 Continuing Continuing / - - / 0.232 - / 1.430 - / 1.458 Continuing Continuing 14.697 Continuing Continuing - Installation - / 0.000 - / 1.689 / - - / 1.689 - - Total Total Cost (Procurement + Support + Installation) LI 2606 - Cooperative Engagement Capability Navy 110.206 12.099 3.090 1.689 0.000 UNCLASSIFIED Page 15 of 17 1.689 8.316 8.714 P-1 Line #49 10.082 Volume 2 - 287 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UC003 - PAAA BACKFIT KITS MDAP/MAIS Code: Modification Item 1 of 1: UC003 - PAAA BACKFIT KITS Manufacturer Information Manufacturer Name: RAYTHEON Manufacturer Location: ST.PETERSBURG, FL (10) Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 14 Dates FY 2025 Contract Dates Dec 2024 Delivery Dates Manufacturer Name: LEIDOS FY 2026 FY 2027 FY 2028 FY 2031 FY 2030 FY 2031 FY 2031 Manufacturer Location: TBD Production Leadtime (in Months): 14 FY 2025 FY 2026 FY 2027 Contract Dates Delivery Dates FY 2028 FY 2029 Mar 2028 Mar 2029 May 2029 May 2030 Manufacturer Name: TBD Manufacturer Location: New MFG - Loc Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 14 Dates FY 2030 Feb 2026 (11) Administrative Leadtime (in Months): 0 Dates FY 2029 FY 2029 FY 2030 Contract Dates FY 2025 FY 2026 FY 2027 FY 2028 Feb 2029 Feb 2030 Delivery Dates Apr 2030 Apr 2031 Installation Information Method of Implementation: ALTERATION INSTALLATION TEAM (AIT):: Installation Name: PAAA BACKFIT KITS Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 18 / 25.748 - 3 / 2.163 5 / 2.760 - / - - / - - / - - / - - / - 0 / 0.000 26 / 30.671 FY 2025 - / - - / - 0 / 0.330 3 / 1.689 0 / 0.000 3 / 1.689 - / - - / - - / - - / - 0 / 0.000 3 / 2.019 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 0.232 2 / 1.194 - / - 0 / 0.000 2 / 1.426 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.236 2 / 1.218 0 / 0.000 2 / 1.454 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.240 2 / 1.242 2 / 1.482 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 2.265 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 3 / 1.689 - / - 0 / 0.232 2 / 1.458 Continuing Continuing Total 18 / 25.748 LI 2606 - Cooperative Engagement Capability Navy 3 / 2.163 5 / 3.090 / - - 3 / 1.689 / - 0 / 0.000 UNCLASSIFIED Page 16 of 17 P-1 Line #49 2 / 1.430 3 / 2.265 Volume 2 - 288 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2606 / Cooperative Engagement Capability Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / UC003 - PAAA BACKFIT KITS MDAP/MAIS Code: Modification Item 1 of 1: UC003 - PAAA BACKFIT KITS Installation Information Method of Implementation: ALTERATION INSTALLATION TEAM (AIT):: Installation Name: PAAA BACKFIT KITS Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 18 - 2 1 - - 2 3 - - 2 1 - - - - - - - - - - 1 1 - - 1 1 - 26 59 Out 18 - 2 1 - - 2 3 - - 2 1 - - - - - - - - - - 1 1 - - 1 1 - 26 59 Footnotes: (10) Procurement strategy reverted from CAB to PAAA antenna in FY2020. The last option year for the PAAA contract was awarded in Q3 FY2024. FY2025 procurement quantities were placed on the last option year. RAYTHEON provided the legacy PAAA antenna. (11) PAAA LRIP OTA contract award is expected in Q42 FY2028. LEIDOS will provide the modern PAAA antenna. LI 2606 - Cooperative Engagement Capability Navy UNCLASSIFIED Page 17 of 17 P-1 Line #49 Volume 2 - 289 === page 370 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 290 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 740.679 740.679 740.679 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 13.614 7.972 10.108 0.000 10.108 11.305 15.636 18.856 - - - - - - - - 13.614 7.972 10.108 0.000 10.108 11.305 15.636 18.856 To FY 2031 Complete - Total - 22.271 Continuing - Continuing - 22.271 Continuing - Continuing - - - - - - - - - - 13.614 7.972 10.108 0.000 10.108 11.305 15.636 18.856 22.271 Continuing Continuing 0.462 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.123 0.010 0.098 - 0.098 0.248 0.250 0.494 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Naval Tactical Command Support System (NTCSS) is the logistics information system which enables combat lethality by generating and sustaining Navy and Marine Corps force maintenance and logistics readiness for operational commanders afloat and ashore. NTCSS provides organizational maintenance management capabilities for all afloat and ashore operational forces (ships, submarines, expeditionary, and cyber), as well as organizational and intermediate maintenance management to maintain operational availability of deployed and deployable aircraft. NTCSS also provides personnel administration capabilities, planning and execution of warehouse and inventory management functions for repair parts and consumable material, financial accountability thereof, and support services of food and afloat retail point-of-sale operations. NTCSS system upgrades procures afloat and ashore ruggedized, commercial-off-the-shelf (COTS) computing equipment, which includes servers to support the NTCSS application and database, personal computers (PCs) that will interface with the servers for maintenance and supply transactions, and printers to display output. COTS software, which includes the operating system, comes loaded on the servers and PCs. The Naval Operational Business Logistics Enterprise (NOBLE) family of systems includes Naval Operational Supply System (NOSS), and Naval Maintenance, Repair, and Overhaul (N-MRO), and Logistics Integrated Data Environment (L-IDE). The NOBLE family of systems will provide direct support to warfighter readiness with maintenance, supply, and personnel administration capabilities using an open architecture framework that incorporates business process re-engineering (BPR) allowing for the consolidation of standalone application systems. These capabilities include enterprise-wide automation of supply, inventory, and financial functions to the Naval supply system, aviation maintenance support capability that services aviation maintenance (organizational and intermediate) for over 2,100 Navy and Marine Corps aircraft, standardized operational business processes for afloat maritime maintenance activities to all naval ships, expeditionary forces and Navy-wide personnel and administration data sharing across shipboard and shore-based information systems. NOBLE will meet current and emerging demands for cyber, Financial Improvement and Audit Readiness (FIAR), and Navy logistics and aviation and maritime maintenance mission requirements. Naval Operational Supply System (NOSS) will deliver a solution with enterprise and field level capability to ensure effective and efficient supply operations. NOSS will enable the planning, procurement and physical/financial accountability of all material and property across all warfare communities. Naval Maintenance, Repair, and Overhaul (NMRO) combines the former Naval Aviation Maintenance System (NAMS), Naval Operational Maintenance Environment (NOME) capabilities into one program of record (PoR) that satisfies Organizational and Intermediate levels of maintenance across ashore and afloat Aviation and Maritime domains. Logistics Integrated Data Environment (LIDE) is the DON Logistics and Sustainment information domain enterprise data environment which support DON Chief Information Officer (CIO) data strategy, architecture, and integration with DoW and DON level enterprise data environments. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 1 of 23 P-1 Line #50 Volume 2 - 291 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / NTCSS and NOBLE Ship Set Equipment Upgrades P-3a 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) (TBD) P-3a 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) (TBD) P-3a 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) (TBD) P-3a 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) (TBD) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Title* FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 355.525 - / 1.513 - / 1.340 - / 1.826 - / 0.000 - / 1.826 - / 375.949 - / 6.818 - / 6.632 - / 5.731 - / 0.000 - / 5.731 - / 4.435 - / 0.644 - / 0.000 - / 2.551 - / 0.000 - / 2.551 - / 3.600 - / 3.427 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - Exhibits Schedule Exhibit Type Prior Years Subexhibits ID CD MDAP/ MAIS Code / 1.170 - / 1.212 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / 740.679 - / 13.614 - / 7.972 - / 10.108 - / 0.000 - / 10.108 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / NTCSS and NOBLE Ship Set Equipment Upgrades P-3a 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) (TBD) P-5a - / 2.329 - / 1.001 - / 1.048 - / 1.088 P-3a 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) (TBD) - / 3.843 - / 3.864 - / 3.954 - / 2.742 P-3a 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) (TBD) - / 0.181 - / 1.407 - / 2.059 - / 2.886 P-3a 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) (TBD) - / 3.212 - / 7.767 - / 10.074 - / 12.505 P-40 Total Gross/Weapon System Cost - / 11.305 - / 15.636 - / 18.856 - / 22.271 - / - - / - - / - - / - - / - - / - Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding increase from FY26 to FY27 of $2.136M is the net result of the combined as follows: Naval Tactical Command Support System (NTCSS): FY27 decrease of $0.930M due to reduction from 37 installs in FY26 to 35 installs in FY27 afloat. Funds support hardware/software technical refresh for critical capability upgrades and cybersecurity compliance that maintains accreditation to meet evolving threat posture in contested environments. This funding provides a service-life extension to supply chain and maintenance IT capabilities required by the Fleet to meet operational user requirements of all platforms. Procures NTCSS system upgrades and necessary production engineering and installation support for Naval Air Stations (NAS), Squadrons, Shore Support Facilities, Fleet Training Centers, Marine Aviation Logistics Squadrons (MALS), Navy Expeditionary Combat Command sites, Special Warfare units, and Commander Naval Surface Forces. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 2 of 23 P-1 Line #50 Volume 2 - 292 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Naval Maintenance, Repair, and Overhaul (N-MRO): No changes from FY26 to FY27 based on revised ASN(RDA) acquisition strategy following SECNAV memorandum dated 24 April 2025, directed cancellation of the N-MRO Other Transaction Authority (OTA) agreement with Lockheed Martin. Initial procurement costs following initial pilot and prototype of commercial off the shelf (COTS) of NMRO solution for designated Maritime and Aviation activities. Logistics Integrated Data environment (L-IDE): FY27 increase of $0.038M and funding supports procurement of common software licenses, servers, and data storage upgrades across designated Echelon 2/3 Navy System Commands to support Department of Navy (DON) Chief Information Officer (CIO) data strategy, architecture, and integration with DoW and DON level enterprise data environments across mission commanders, warfighters, decision makers, and mission partners. Naval Operational Supply System (NOSS): FY27 increase of $3.028M primarily due to acceleration of development towards the initial deployment of Minimum Viable Commercial Release (MVCR 1) in FY27 and subsequent expansion of functionality. Funding supports Naval operational level supply activities to meeting Department of Navy (DON) Financial Audit requirements, as well as supporting Fleet Maintenance Optimization (FMO), NSS-Shipyard, NSS-Aviation, & NSS-Supply objectives for ashore/afloat activities. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 3 of 23 P-1 Line #50 Volume 2 - 293 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NTCSS and NOBLE Ship Set Equipment Upgrades MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 1.513 1.340 1.826 0.000 1.826 - Gross/Weapon System Cost ($ in Millions) 355.525 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 355.525 Plus CY Advance Procurement ($ in Millions) - - - - - 1.513 1.340 1.826 0.000 1.826 - Total Obligation Authority ($ in Millions) 355.525 FY 2027 Total - - - - - 1.513 1.340 1.826 0.000 1.826 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - NTCSS Ship Set Equipment Upgrades (DY007) Cost Recurring Cost (†) (1) 1,240 166.202 1.000 64 0.064 1.000 37 0.037 1.000 35 0.035 - - 0.000 1.000 35 0.035 - - 166.202 - - 0.064 - - 0.037 - - 0.035 - - 0.000 - - 0.035 1.2.1) NTCSS NonRecurring Engineering - - 0.000 - - 1.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 0.000 - - 1.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway - NTCSS Ship Set Equipment Upgrades (DY007) Cost - - 166.202 - - 1.264 - - 0.037 - - 0.035 - - 0.000 - - 0.035 - - 17.260 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 15.525 8 0.124 - - 0.000 15.525 8 0.124 - - 0.000 - - 0.000 48.000 0.192 46.000 4 0.184 - - 0.000 46.000 4 0.184 - - 17.260 - - 0.000 - 0.192 - 0.308 - - 0.000 - 1.1.1) Equipment Subtotal: Recurring Cost 134.034 Non Recurring Cost Flyaway - NOBLE Equipment Upgrades Cost Recurring Cost 2.1.1) Consolidated Prior Year Requirements (2) 2.1.2) NOSS Ship Set Equipment Upgrades (DY997) (†) (3) 2.1.3) L-IDE Ashore Procurement (†) (4) Subtotal: Recurring Cost LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy 4 - UNCLASSIFIED Page 4 of 23 - P-1 Line #50 - 0.308 Volume 2 - 294 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NTCSS and NOBLE Ship Set Equipment Upgrades MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Subtotal: Flyaway - NOBLE Equipment Upgrades Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 17.260 - - 0.000 - - 0.192 - - 0.308 - - 0.000 - - 0.308 (5) - - 151.849 - - 0.246 - - 0.902 - - 0.875 - - 0.000 - - 0.875 (6) - - 0.000 - - 0.000 - - 0.000 - - 0.353 - - 0.000 - - 0.353 (7) - - 0.000 - - 0.000 - - 0.192 - - 0.172 - - 0.000 - - 0.172 Subtotal: Recurring Cost - - 151.849 - - 0.246 - - 1.094 - - 1.400 - - 0.000 - - 1.400 - - 151.849 - - 0.246 - - 1.094 - - 1.400 - - 0.000 - - 1.400 Flyaway - Installations Cost Recurring Cost 3.1.1) NTCSS Afloat Installation (DY777) 3.1.2) NOSS Afloat Installation (DY777) 3.1.3) L-IDE Ashore Installation (DY776) Subtotal: Flyaway Installations Cost Support - Support Costs (DY555) Cost (8) - - 5.989 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.2) NTCSS Afloat Production Support - - 14.225 - - 0.003 - - 0.003 - - 0.003 - - 0.000 - - 0.003 4.3) L-IDE Production Support (DY555) - - 0.000 - - 0.000 - - 0.014 - - 0.080 - - 0.000 - - 0.080 Subtotal: Support - Support Costs (DY555) Cost - - 20.214 - - 0.003 - - 0.017 - - 0.083 - - 0.000 - - 0.083 Gross/Weapon System Cost - - 355.525 - - 1.513 - - 1.340 - - 1.826 - - 0.000 - - 1.826 4.1) Train-the-Trainer Remarks: Provides Automatic Data Processing (ADP) system upgrades and NTCSS-Optimized software to Battle Group and unit level ships. Application subsystems include financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also provide ship capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc) [Flyaway] NOBLE, which includes NOSS and N-MRO, will be fielded at program of record (PoR) afloat and ashore sites. Ship set and U.S. Navy and USMC aviation equipment upgrades continue; hardware and software upgrades are required to reduce cybersecurity, technical debt, and obsolescence avoidance. Revised fielding and deployment plan changed the year-to-year quantity due to operations availability schedules and integrated capability deployment. The variance in unit cost between fiscal years is attributed to the composition of ashore, afloat, and expeditionary configurations that includes NOSS and N-MRO will be procuring and installing in any given fiscal year. (†) indicates the presence of a P-5a LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 5 of 23 P-1 Line #50 Volume 2 - 295 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NTCSS and NOBLE Ship Set Equipment Upgrades MDAP/MAIS Code: Footnotes: (1) Quantity changes from year to year are driven by fact-of-life changes to ship maintenance availability schedules. The average unit cost fluctuation is primarily attributed to variance in system configuration requirements for each NTCSS platform type. NTCSS continues to transition to a CANES hosted environment. The unit cost represents the cost of software licenses, as well as hardware for non-CANES platforms. (2) (3) (4) This line reflects prior year only costs for the following: NOBLE, NMRO and NOSS early adopter equipment upgrades required to reduce cybersecurity, technical debt, and obsolescence avoidance. Increase in FY27 for the initial deployment of the NOSS pilot solution to multiple shore supply/inventory/financial management specific sites (i.e. fleet operating forces). L-IDE funding provides for annual procurement of common software licenses, servers, and data storage upgrades necessary for the Logistics IT portfolio to integrate with DoW Advana and DON Jupiter enterprise-wide integrated data environments. (5) (6) (7) Installation cost variance due to system configuration requirements for each NTCSS platform type. Increase in FY27 for support costs associated with the deployment of the NOSS pilot solution to multiple shore supply/inventory/financial management specific sites (i.e. fleet operating forces). Cost changes from year to year are driven by L-IDE hybrid architecture enablement, which reduces on-premises hardware technical refresh and scaling requirements as integrations with and migrations to cloud native L-IDE capabilities are realized. (8) This line reflects prior year only costs for the following: NOBLE, NMRO and NOSS early adopter equipment upgrades required to reduce cybersecurity, technical debt, and obsolescence avoidance. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 6 of 23 P-1 Line #50 Volume 2 - 296 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Item Number / Title [DODIC]: 1 / NTCSS and NOBLE Ship Set Equipment Upgrades FY Contractor and Location Method/Type or Funding Vehicle 1.1.1) Equipment 2025 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2024 Jan 2025 64 1.000 Y Oct 2024 1.1.1) Equipment 2026 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2025 Jan 2026 37 1.000 Y Oct 2025 1.1.1) Equipment 2027 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2026 Jan 2027 35 1.000 Y Oct 2026 2.1.2) NOSS Ship Set Equipment Upgrades (DY997) 2027 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2026 Jan 2027 8 15.525 Y Oct 2025 2.1.3) L-IDE Ashore Procurement 2026 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2025 Jan 2026 4 48.000 Y Oct 2024 2.1.3) L-IDE Ashore Procurement 2027 NIWC LANT / Charleston, SC WR Charleston, SC Nov 2026 Jan 2027 4 46.000 Y Oct 2025 Cost Elements O O C P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 7 of 23 P-1 Line #50 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 2 - 297 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) MDAP/MAIS Code: Prior Years 375.949 375.949 375.949 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 6.818 6.632 5.731 0.000 5.731 2.329 1.001 1.048 - - - - - - - - 6.818 6.632 5.731 0.000 5.731 2.329 1.001 1.048 - - - - - - - - 6.818 6.632 5.731 0.000 5.731 2.329 1.001 1.048 To FY 2031 Complete 1.088 Continuing - Continuing - 1.088 Continuing - Total - Continuing - - 1.088 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: NTCSS-Optimized software will continue to be fielded at program of record (PoR) afloat and ashore sites. Ship set and MALS/Shore equipment upgrades continue; hardware and software upgrades required for obsolescence avoidance. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 8 of 23 P-1 Line #50 Volume 2 - 298 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Provides Automatic Data Processing (ADP) system upgrades and NTCSSOptimized software to force level Prior Years Financial Plan Modification Number / Title: 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) B Kits Recurring 1.1.1) Equipment - NonOrganic (9) 1,809 / 224.754 Subtotal: Recurring Subtotal: Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) / 224.754 - 1,809 / 224.754 Subtotal: Procurement, All Modification Items - 38 / 3.042 - / 3.042 38 / 3.042 36 / 2.960 - / 2.960 36 / 2.960 32 / 2.508 - / - 32 / 2.508 - / - - - / - 32 / 2.508 - / - - / 2.508 - / 1.100 - / 0.458 - / 0.467 - 13 / 1.100 / 0.458 5 / 0.467 / 2.508 - / 1.100 5 / 0.458 32 / 2.508 - / 2.508 13 / 1.100 - 5 / 0.458 / 0.467 5 / 0.483 Continuing Continuing / 0.483 Continuing Continuing 5 / 0.483 Continuing Continuing - / 0.483 Continuing Continuing - 5 / 0.467 / 224.754 - / 3.042 - / 2.960 - / 2.508 / 15.095 - / 0.151 - / 0.163 - / 0.141 - / 0.000 - / 0.141 - / 0.030 - / 0.033 - / 0.035 - / 0.042 Continuing Continuing / 4.487 - / 0.124 - / 0.146 - / 0.112 - / 0.000 - / 0.112 - / 0.032 - / 0.034 - / 0.036 - / 0.040 Continuing Continuing / 19.582 - / 0.275 - / 0.309 - / 0.253 / - - / 0.253 - / 0.062 - / 0.067 - / 0.071 - / 0.082 Continuing Continuing / 0.000 - / 2.970 - / 1.167 - / 0.476 - / 0.510 - / 0.523 Continuing Continuing / - - / 2.970 - / 1.167 - / 0.476 - / 0.510 - / 0.523 Continuing Continuing 1.088 Continuing Continuing Support (All Modification Items) 2.1) Production Support 2.2) DSA - (10) Subtotal: Support - - Installation Modification Item 1 of 1: Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) - / 131.613 - / 3.501 - / 3.363 - / 2.970 Subtotal: Installation - / 131.613 - / 3.501 - / 3.363 - / 2.970 - - Total Total Cost (Procurement + Support + Installation) LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy 375.949 6.818 6.632 5.731 0.000 UNCLASSIFIED Page 9 of 23 5.731 2.329 1.001 P-1 Line #50 1.048 Volume 2 - 299 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) MDAP/MAIS Code: Modification Item 1 of 1: Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) Manufacturer Information Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1,809 / 131.613 38 / 3.501 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 38 / 3.501 36 / 3.363 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 36 / 3.363 32 / 2.970 - / - - / - - / - - / - 0 / 0.000 32 / 2.970 13 / 1.167 - / - - / - - / - 0 / 0.000 13 / 1.167 Prior Years 1,809 / 131.613 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 5 / 0.476 - / - - / - 0 / 0.000 5 / 0.476 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.510 - / - 0 / 0.000 5 / 0.510 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.523 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 1,809 / 131.613 38 / 3.501 32 / 2.970 36 / 3.363 0 / 0.000 32 / 2.970 0 / 0.000 32 / 2.970 13 / 1.167 5 / 0.476 5 / 0.510 5 / 0.523 / - Continuing Continuing 5 / 0.523 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 1,809 - 12 13 13 - 12 12 12 - 11 11 10 - 4 4 5 - 2 2 1 - 2 2 1 - 2 2 Q4 1 Cont. Cont. Out 1,809 - 12 13 13 - 12 12 12 - 11 11 10 - 4 4 5 - 2 2 1 - 2 2 1 - 2 2 1 Cont. Cont. TC Tot Footnotes: (9) In FY27, unit cost decreases due to the reduced number of NAS Large and MALS site supported. NAS Large and MALS sites cost less than other sites due to the cost of new servers and racks versus a non-VE, which costs significantly less. Quantity changes from year to year are driven by fact-of-life changes to ashore site availability schedules. The variance in unit cost between fiscal years is attributed to LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 10 of 23 P-1 Line #50 Volume 2 - 300 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Naval Tactical Command Support System (NTCSS) MALS/Shore Equipment Upgrades (DY006) MDAP/MAIS Code: the composition of ashore site configurations that NTCSS will be procuring and installing in any given fiscal year. The variance in installation cost between fiscal years is attributed to the composition of ashore installation sites supported in any given fiscal year. (10) DSA costs will fluctuate as it is a factor of the number of installations and platform type in any given fiscal year. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 11 of 23 P-1 Line #50 Volume 2 - 301 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 4.435 0.644 0.000 2.551 0.000 2.551 3.843 3.864 3.954 - - - - - - - - - 4.435 0.644 0.000 2.551 0.000 2.551 3.843 3.864 3.954 - - - - - - - - - 4.435 0.644 0.000 2.551 0.000 2.551 3.843 3.864 3.954 To FY 2031 Complete 2.742 Continuing - Continuing - 2.742 Continuing - Total - Continuing - - 2.742 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: NOSS software will continue to be fielded at program of record (PoR) ashore sites. Provides printer and scanner hardware upgrades to support continued hardware and software upgrades required for obsolescence avoidance. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 12 of 23 P-1 Line #50 Volume 2 - 302 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: Related RDT&E PEs: 0604231N Models of Systems Affected: NOSS will be replacing/ Modification Type: TBD retiring legacy supply systems ashore, i.e., NTCSS Relational Supply (RSupply Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) B Kits Recurring 1.1.1) Equipment - NonOrganic (11) Subtotal: Recurring Subtotal: Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) Subtotal: Procurement, All Modification Items 19 / 1.150 - / 1.150 - 19 / 1.150 4 / 0.252 - / - 19 / 1.140 - / - 19 / 1.140 / 0.252 - / - - / 1.140 - / - - 4 / 0.252 - / - 19 / 1.140 - / - 19 / 1.140 / 1.140 30 / 1.710 - / 1.710 30 / 1.710 30 / 1.710 - / 1.710 30 / 1.710 30 / 1.710 - / 1.710 30 / 1.710 18 / 1.026 Continuing Continuing / 1.026 Continuing Continuing 18 / 1.026 Continuing Continuing Continuing Continuing - - / 1.150 - / 0.252 - / - - / 1.140 - / - - / 1.140 - / 1.710 - / 1.710 - / 1.710 - / 1.026 2.1) Production Support - / 0.107 - / 0.038 - / - - / 0.090 - / - - / 0.090 - / 0.169 - / 0.178 - / 0.222 - / 0.251 - / - - / 1.055 (12) - / 0.525 - / 0.102 - / - - / 0.181 - / - - / 0.181 - / 0.254 - / 0.266 - / 0.312 - / 0.439 - / - - / 2.079 - / 0.632 - / 0.140 - / - - / 0.271 - / - - / 0.271 - / 0.423 - / 0.444 - / 0.534 - / 0.690 - / 0.000 - / 3.134 Modification Item 1 of 1: Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) - / 2.653 - / 0.252 / 0.000 - / 1.140 / 0.000 - / 1.140 - / 1.710 - / 1.710 - / 1.710 - / 1.026 Continuing Continuing Subtotal: Installation - / 2.653 - / 0.252 / - - / 1.140 / - - / 1.140 - / 1.710 - / 1.710 - / 1.710 - / 1.026 Continuing Continuing 2.742 Continuing Continuing Support (All Modification Items) 2.2) DSA Subtotal: Support Installation - - - - Total Total Cost (Procurement + Support + Installation) LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy 4.435 0.644 0.000 2.551 0.000 UNCLASSIFIED Page 13 of 23 2.551 3.843 3.864 P-1 Line #50 3.954 Volume 2 - 303 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: Modification Item 1 of 1: Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) Manufacturer Information Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 19 / 2.653 FY 2025 19 / 2.653 - / - 4 / 0.252 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 0.252 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 19 / 1.140 - / - - / - - / - - / - 0 / 0.000 19 / 1.140 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 30 / 1.710 FY 2029 - / - - / - - / - - / - - / - - / - - / - 30 / 1.710 - / - - / - 0 / 0.000 30 / 1.710 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 30 / 1.710 - / - 0 / 0.000 30 / 1.710 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 1.026 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.252 - / - Total 19 / 2.653 19 / 1.140 0 / 0.000 19 / 1.140 0 / 0.000 30 / 1.710 19 / 1.140 30 / 1.710 30 / 1.710 - 30 / 1.710 / - - / - 18 / 1.026 / - Continuing Continuing 18 / 1.026 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 19 - 1 1 2 - - - - - 7 6 6 - 10 10 10 - 10 10 10 - 10 10 10 - 6 6 Q4 6 Cont. Cont. Out 19 - 1 1 2 - - - - - 7 6 6 - 10 10 10 - 10 10 10 - 10 10 10 - 6 6 6 Cont. Cont. TC Tot Footnotes: LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 14 of 23 P-1 Line #50 Volume 2 - 304 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Naval Operational Supply System (NOSS) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: (11) Quantity changes are driven by the decision to require a material solution analysis (MSA) to be conducted to evaluate alternative DON investments in supply solutions. This directly changed the deployment/ NOSS fielding plan for shore/afloat site installation quantities and phasing. The variance in installation cost between fiscal years is attributed to the composition of ashore installation sites supported in any given fiscal year. (12) DSA costs will fluctuate as it is a factor of the number of installations and platform type in any given fiscal year. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 15 of 23 P-1 Line #50 Volume 2 - 305 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 3.600 3.427 0.000 0.000 0.000 0.000 0.181 1.407 2.059 - - - - - - - - - 3.600 3.427 0.000 0.000 0.000 0.000 0.181 1.407 2.059 - - - - - - - - - 3.600 3.427 0.000 0.000 0.000 0.000 0.181 1.407 2.059 To FY 2031 Complete 2.886 Continuing - Continuing - 2.886 Continuing - Total - Continuing - - 2.886 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: N-MRO software will continue to be fielded at program of record (PoR) ashore sites. Marine Aviation Logistics Squadron (MALS) and squadron detachment system (Laptop server) upgrades continue, as well as hardware and software upgrades required for obsolescence avoidance. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 16 of 23 P-1 Line #50 Volume 2 - 306 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: N-MRO will be replacing/retiring legacy systems ashore, i.e., Naval Aviation Logistics Command Manag Prior Years Financial Plan Modification Number / Title: 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) Related RDT&E PEs: 0604231N Modification Type: TBD FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) B Kits Recurring 1.1.1) Equipment - NonOrganic (13) Subtotal: Recurring Subtotal: Naval Maintenance, Repair, and Overhaul (NMRO) MALS/Shore Equipment Upgrades (DY997) Subtotal: Procurement, All Modification Items 36 / 1.309 - / 1.309 36 / 1.309 31 / 1.767 - / - - / - - / - - / - - / - 11 / 0.633 / 1.767 - / - - / - - / - - / - - / - - 31 / 1.767 - / - - / - - / - - / - - / - 11 / 0.633 - / - - / 0.633 - / 0.864 - / 0.633 15 / 0.864 - / 0.864 15 / 0.864 18 / 1.036 Continuing Continuing / 1.036 Continuing Continuing 18 / 1.036 Continuing Continuing - / 1.036 Continuing Continuing - - / 1.309 - / 1.767 - / - - / - - / - - / - 2.1) Production Support - / 0.191 - / 0.096 - / - - / - - / - - / - - / 0.093 - / 0.117 - / 0.159 - / 0.361 Continuing Continuing (14) - / 0.070 - / 0.076 - / - - / - - / - - / - - / 0.088 - / 0.129 - / 0.316 - / 0.625 Continuing Continuing - / 0.261 - / 0.172 - / - - / - - / - - / - - / 0.181 - / 0.246 - / 0.475 - / 0.986 Continuing Continuing Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) - / 2.030 - / 1.488 / 0.000 - / 0.000 - / 0.528 - / 0.720 - / 0.864 Continuing Continuing Subtotal: Installation - / 2.030 - / 1.488 / - - / 0.528 - / 0.720 - / 0.864 Continuing Continuing 2.886 Continuing Continuing Support (All Modification Items) 2.2) DSA Subtotal: Support Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - - / - - Total Total Cost (Procurement + Support + Installation) LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy 3.600 3.427 0.000 0.000 0.000 UNCLASSIFIED Page 17 of 23 0.000 0.181 1.407 P-1 Line #50 2.059 Volume 2 - 307 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) Manufacturer Information Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 36 / 2.030 31 / 1.488 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 31 / 1.488 Prior Years 36 / 2.030 FY 2025 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 11 / 0.528 - / - - / - 0 / 0.000 11 / 0.528 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 0.720 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 0.864 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - 31 / 1.488 - / - - / - - / - - / - - / - Total 36 / 2.030 15 / 0.720 11 / 0.528 - 15 / 0.720 18 / 0.864 / - Continuing Continuing 18 / 0.864 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 36 - 10 10 11 - - - - - - - - - - - - - 4 4 3 - 5 5 5 - 6 6 Q4 6 Cont. Cont. Out 36 - 10 10 11 - - - - - - - - - - - - - 4 4 3 - 5 5 5 - 6 6 6 Cont. Cont. TC Tot Footnotes: (13) The average unit cost fluctuation is primarily attributed to variance in system configuration requirements for each N-MRO platform type. Quantity will change from year to year are driven by fact-of-life changes to afloat availability schedules. The N-MRO funding provides for adjusts to the afloat infrastructure, i.e. installing additional Local Area Network (LAN) drops, port extending switches, and ancillary LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 18 of 23 P-1 Line #50 Volume 2 - 308 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Naval Maintenance, Repair, and Overhaul (N-MRO) MALS/Shore Equipment Upgrades (DY997) MDAP/MAIS Code: hardware (tablet docking stations and battery chargers) to support the afloat operating warfighting environments resulting in driving up the base unit cost per afloat platform. Increased ship installation complexity results in an increase in installation costs to ensure the N-MRO solution mobile capability will be fully deployed across each ship class with an integrated mobile device capability reside within each department of a ship. (14) DSA costs will fluctuate as it is a factor of the number of installations and platform type in any given fiscal year. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 19 of 23 P-1 Line #50 Volume 2 - 309 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 1.170 1.212 0.000 0.000 0.000 0.000 3.212 7.767 10.074 - - - - - - - - - 1.170 1.212 0.000 0.000 0.000 0.000 3.212 7.767 10.074 - - - - - - - - - 1.170 1.212 0.000 0.000 0.000 0.000 3.212 7.767 10.074 To FY 2031 Complete 12.505 Continuing - Continuing - 12.505 Continuing - Total - Continuing - - 12.505 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: N-MRO software will continue to be fielded at program of record (PoR) afloat sites. Providing hardware components to support a mobile application capability for point of performance maintenance capability, as well as hardware and software upgrades required for obsolescence avoidance. [Equipment] LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 20 of 23 P-1 Line #50 Volume 2 - 310 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: N-MRO will be replacing/retiring legacy systems afloat, i.e., Maintenance Figure of Merit (MFOM), el Related RDT&E PEs: 0604231N 0604231N Modification Type: TBD Prior Years Financial Plan Modification Number / Title: 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) B Kits Recurring 1.1.1) Equipment - NonOrganic 7 / 0.442 (15) Subtotal: Recurring - Subtotal: Naval Maintenance, Repair, and Overhaul (NMRO) Ship Set Equipment Upgrades (DY997) Subtotal: Procurement, All Modification Items / 0.442 - 7 / 0.442 2 / 0.440 - / - - / - - / - - / - / 0.440 - / - - / - - / - - / - 2 / 0.440 - / - - / - - / - - / - 7 / 1.260 - / 1.260 7 / 1.260 16 / 2.880 - / 2.880 16 / 2.880 20 / 3.600 - / 3.600 20 / 3.600 24 / 4.320 Continuing Continuing / 4.320 Continuing Continuing 24 / 4.320 Continuing Continuing - - / 0.442 - / 0.440 - / - - / - - / - - / - - / 1.260 - / 2.880 - / 3.600 - / 4.320 Continuing Continuing 2.1) Production Support - / 0.189 - / 0.096 - / - - / - - / - - / - - / 0.093 - / 0.118 - / 0.158 - / 0.360 Continuing Continuing (16) - / 0.070 - / 0.076 - / - - / - - / - - / - - / 0.088 - / 0.129 - / 0.316 - / 0.625 Continuing Continuing - / 0.259 - / 0.172 - / - - / - - / - - / - - / 0.181 - / 0.247 - / 0.474 - / 0.985 Continuing Continuing Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) - / 0.469 - / 0.600 / 0.000 - / 1.771 - / 4.640 - / 6.000 - / 7.200 Continuing Continuing Subtotal: Installation - / 0.469 - / 0.600 / - - / 1.771 - / 4.640 - / 6.000 - / 7.200 Continuing Continuing 12.505 Continuing Continuing Support (All Modification Items) 2.2) DSA Subtotal: Support Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - - Total Total Cost (Procurement + Support + Installation) LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy 1.170 1.212 0.000 0.000 0.000 UNCLASSIFIED Page 21 of 23 0.000 3.212 7.767 P-1 Line #50 10.074 Volume 2 - 311 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) MDAP/MAIS Code: Modification Item 1 of 1: Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) Manufacturer Information Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 7 / 0.469 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 0.469 FY 2025 - / - 2 / 0.600 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.600 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - 7 / 1.771 - / - - / - - / - 0 / 0.000 7 / 1.771 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 4.640 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 20 / 6.000 - / - 0 / 0.000 20 / 6.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 7.200 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 7 / 0.469 2 / 0.600 - / - - / - - / - - / - 7 / 1.771 16 / 4.640 16 / 4.640 - 20 / 6.000 24 / 7.200 / - Continuing Continuing 24 / 7.200 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 7 - - 1 1 - - - - - - - - - 2 2 3 - 5 5 6 - 7 7 6 - 8 8 Q4 8 Cont. Cont. Out 7 - - 1 1 - - - - - - - - - 2 2 3 - 5 5 6 - 7 7 6 - 8 8 8 Cont. Cont. TC Tot Footnotes: (15) The average unit cost fluctuation is primarily attributed to variance in system configuration requirements for each N-MRO platform type. Quantity will change from year to year are driven by fact-of-life changes to afloat availability schedules. The N-MRO funding provides for adjusts to the afloat infrastructure, i.e. installing additional Local Area Network (LAN) drops, port extending switches, and ancillary LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 22 of 23 P-1 Line #50 Volume 2 - 312 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2611 / Naval Tact Cmd Supt Sys (NTCSS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Naval Maintenance, Repair, and Overhaul (N-MRO) Ship Set Equipment Upgrades (DY997) MDAP/MAIS Code: hardware (tablet docking stations and battery chargers) to support the afloat operating warfighting environments resulting in driving up the base unit cost per afloat platform. Increased ship installation complexity results in an increase in installation costs to ensure the N-MRO solution mobile capability will be fully deployed across each ship class with an integrated mobile device capability reside within each department of a ship. (16) DSA costs will fluctuate as it is a factor of the number of installations and platform type in any given fiscal year. LI 2611 - Naval Tact Cmd Supt Sys (NTCSS) Navy UNCLASSIFIED Page 23 of 23 P-1 Line #50 Volume 2 - 313 === page 394 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 314 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Program Elements for Code B Items: N/A Other Related Program Elements: 0205604N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 512.637 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 512.637 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 512.637 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 68.458 58.739 52.758 0.000 52.758 61.686 60.830 65.629 - - - - - - - - 68.458 58.739 52.758 0.000 52.758 61.686 60.830 65.629 To FY 2031 Complete - Total - 66.984 Continuing - Continuing - 66.984 Continuing - Continuing - - - - - - - - - - 68.458 58.739 52.758 0.000 52.758 61.686 60.830 65.629 66.984 Continuing Continuing 1.075 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.782 0.221 0.754 - 0.754 1.218 0.929 1.158 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Advanced Tactical Data Link Systems (ATDLS) is the United States (US) Navy's only ship-to-ship/ship-to-aircraft tactical information solution equipping warfighters and Combatant Commanders with real-time battlespace data and extending the range of lethality. ATDLS is the backbone of Carrier Strike Group and AEGIS-Based Defense operations and is the key component in the fire control loop, providing critical track information for enabling maritime offense/defense, Joint Area Domain Command and Control (JADC2), Integrated Air and Missile Defense (IAMD), Ballistic Missile Defense (BMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASuW), Electronic Warfare (EW), Advanced Offboard Electronic Warfare (AOEW), and Long Range Fires (LRF) missions. ATDLS Integration Program develops new and improved Tactical Data Links (TDL) networking capabilities, delivering operational and targeting support to the warfighter. ATDLS rapidly and securely connects carrier/shipboard digital combat systems to military aircraft, ground troops, coalition partners, and space assets with vital Situational Awareness, targeting, and sensor information. ATDLS also provides Joint Range Extension capability via Link 16 Network (Link 16) Terminals, Command and Control Processor (C2P), and Link Monitoring and Management Tool (LMMT). C2P Technology Refresh (TR) and C2P Modernization (MOD) Full Systems Ship/Shore (DR003): C2P is the only shipboard solution that enables bi-directional exchange of tactical information across multiple TDLs within the joint operations areas. C2P processes and exchanges Link 11, Link 16, Satellite TDL J, and Joint Range Extension Applications Protocol (JREAP) tactical data among the US, North Atlantic Treaty Organization (NATO), and allied nation military platforms enabling the vital joint TDL interface. Additionally, C2P provides data translation services, acts as a single interface between host combat system and TDL networks, and forwards tactical data between platforms operating at extended ranges. C2P enables surface platforms capability to conduct Ballistic Missile Defense BMD Launch-on-Remote/Engageon-Remote and Autonomous Vehicle missions. C2P TR with C2P v3.13 software baseline enables Tactical Targeting Network Technology (TTNT), equipping warfighters with faster network speed and improved capacity. C2P MOD procurements seamlessly cut-in starting FY26 utilizing existing contract strategy. C2P Mod delivers Link 22 capability allowing interoperability with coalition partners; as well as enabling an agile DevSecOps software deployment for rapid capability and cybersecurity upgrades, enabling continuous kill chain improvements. Link 16 TTNT Upgrade Kits (DR012): Link 16 enhanced by TTNT serves as the military's only joint network capable of providing secure tactical data link interoperability and data sharing in contested battlespace environments. These upgrade kits modernize currently fielded Link 16 cabinets through two primary configurations: the Multifunctional Information Distribution System (MIDS) on-Ship (MOS) and MOS Modernization (MOS Mod). The Link 16 TTNT MOS-J Upgrade Kit and Link 16 TTNT MOS Mod enhance existing configurations in accordance with Joint Chiefs of Staff Joint Requirements Oversight Council Memorandum (JROCM) 075-17, enabling the integration and installation of MIDS Joint Tactical Radio System (MIDS JTRS) terminals within Navy shipboard environments. Key Modernization Features include: (1) MOS and MOS Mod cabinet modernization, enabling TTNT operations on shipboard and shore. Upgrades in MIDS-JTRS AV6, TTNT power amplifier, external GPS input, and updated controller interface computer. (2) Enhanced Capabilities, implementation of JROCM 097-20 and the JROC-validated MIDS JTRS Capability Production Document (CPD) dated February 10, 2011, which mandates Crypto Modernization (CM), Frequency Remapping (FR), Enhanced Throughput (ET), Concurrent Multi-Netting (CMN), and Current Contention Receive (CCR). LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 1 of 15 P-1 Line #51 Volume 2 - 315 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Program Elements for Code B Items: N/A Other Related Program Elements: 0205604N Line Item MDAP/MAIS Code: N/A Link 16 TTNT AS-4775B Antenna and Link 16 TTNT AS-4557 Antenna (DR012): Replace existing Link 16 antennas, AS-4127A (transmit and receive) and AS-4400 (receive only), with enhanced transmitting and receiving capacity, allowing wider frequency range and higher data transfer rate necessary for implementation of TTNT networking. Link Monitoring Management Tool (LMMT) Ship/Shore (DR014): Link Monitoring and Management Tool (LMMT) is the Military's premier solution providing Joint Interface Control Officers (JICOs) and Maritime Operations Centers (MOCs) with effective monitoring and performance management of TDL networks in designated Areas of Responsibility (AORs). LMMT modernization initiatives allows Maritime Component Commanders to Fight from the MOC as well as provide tactical data link source into in-service systems, Global Command and Control System - Maritime (GCCS-M), and future Maven Smart Systems Common Operational Picture (COP). LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 2 of 15 P-1 Line #51 Volume 2 - 316 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Program Elements for Code B Items: N/A Other Related Program Elements: 0205604N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Adv Tact Data Link Sys (ATDLS) - / 102.127 - / 15.103 - / 13.514 - / 8.875 - / 0.000 - / 8.875 P-3a 1 / Adv Tact Data Link Sys (ATDLS) (TBD) - / 410.510 - / 53.355 - / 45.225 - / 43.883 - / 0.000 - / 43.883 P-40 Total Gross/Weapon System Cost - / 512.637 - / 68.458 - / 58.739 - / 52.758 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 52.758 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Adv Tact Data Link Sys (ATDLS) P-3a 1 / Adv Tact Data Link Sys (ATDLS) (TBD) P-5a - / 53.095 - / 53.221 - / 58.459 - / 60.537 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 61.686 - / 60.830 - / 65.629 - / 66.984 Continuing Continuing - / - - / - - / - - / - - / - - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The ATDLS OPN budget exhibits have been updated to reflect a revised program acquisition strategy which optimizes current resourcing while ensuring comprehensive TTNT fielding. Key changes include: (1) Incorporating current system naming conventions within the ATDLS Portfolio. (2) Extended procurement lead Time for C2P Modernization procurements. Lead time have expanded from one to two years to accommodate manufacturer's production timeline. (3) Fielding strategy has shifted from complete Link 16 cabinet terminal replacement to a more efficient upgrade kit solution. (4) Upgrade Antenna Solution to the Link 16 TTNT AS-4775B and the Link 16 TTNT AS-4557 antennas required for full TTNT frequency spectrum coverage. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 3 of 15 P-1 Line #51 Volume 2 - 317 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 15.103 13.514 8.875 0.000 8.875 - Gross/Weapon System Cost ($ in Millions) 102.127 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 102.127 Plus CY Advance Procurement ($ in Millions) - - - - - 15.103 13.514 8.875 0.000 8.875 - Total Obligation Authority ($ in Millions) 102.127 FY 2027 Total - - - - - 15.103 13.514 8.875 0.000 8.875 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - ATDLS Consolidated Prior Year Requirements Cost Recurring Cost 1.1.1) ATDLS Consolidated Prior Year Requirements - - 7.270 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 7.270 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway - ATDLS Consolidated Prior Year Requirements Cost - - 7.270 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 875.818 11 9.634 801.000 3 2.403 - - 0.000 - - 0.000 - - 0.000 - - 0.000 213.676 71 15.171 234.826 23 5.401 239.556 16 3.833 135.875 18 2.446 - - 0.000 135.875 18 2.446 192.178 45 8.648 126.833 6 0.761 133.286 7 0.933 71.408 11 0.785 - - 0.000 71.408 11 0.785 (†) (3) 99.038 78 7.725 126.857 14 1.776 133.400 10 1.334 71.408 3 0.214 - - 0.000 71.408 3 0.214 Subtotal: Recurring Cost - - 41.178 - - 10.341 - - 6.100 - - 3.445 - - 0.000 - - 3.445 Subtotal: Flyaway - Adv Tact Data Link Sys (ATDLS) Cost - - 41.178 - - 10.341 - - 6.100 - - 3.445 - - 0.000 - - 3.445 Flyaway - Adv Tact Data Link Sys (ATDLS) Cost Recurring Cost 2.1.1) C2P - Terminal (†) Shore 2.1.2) Link 16 TTNT (†) (1) AS-4557 Antenna (†) 2.1.3) LMMT - Ship (2) 2.1.4) LMMT Shore Flyaway - Adv Tact Data Link Sys (ATDLS) Installations Cost Recurring Cost LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 4 of 15 P-1 Line #51 Volume 2 - 318 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 3.1.1) Link 16 TTNT AS-4557 Antenna Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 10.381 - - 3.042 - - 5.474 - - 3.293 - - 0.000 - - 3.293 - - 1.822 - - 0.386 - - 0.363 - - 0.635 - - 0.000 - - 0.635 3.1.3) C2P - Terminal Shore Install - - 4.824 - - 0.184 - - 0.570 - - 0.000 - - 0.000 - - 0.000 3.1.4) C2P - Terminal Shore DSA - - 0.149 - - 0.154 - - 0.302 - - 0.000 - - 0.000 - - 0.000 - - 7.221 - - 0.146 - - 0.174 - - 0.776 - - 0.000 - - 0.776 - - 5.412 - - 0.304 - - 0.223 - - 0.710 - - 0.000 - - 0.710 Subtotal: Recurring Cost - - 29.809 - - 4.216 - - 7.106 - - 5.414 - - 0.000 - - 5.414 Subtotal: Flyaway - Adv Tact Data Link Sys (ATDLS) Installations Cost - - 29.809 - - 4.216 - - 7.106 - - 5.414 - - 0.000 - - 5.414 Install (4) 3.1.2) Link 16 TTNT AS-4557 Antenna DSA (5) 3.1.5) LMMT - Ship Install (6) 3.1.6) LMMT - Shore Install (7) Support - Adv Tact Data Link Sys (ATDLS) PRODUCTION SUPPORT Cost 4.1) Link 16 TTNT AS-4557 Antenna Production Support - - 1.289 - - 0.240 - - 0.163 - - 0.000 - - 0.000 - - 0.000 4.2) C2P - Terminal Shore Production Support - - 0.046 - - 0.144 - - 0.000 - - 0.000 - - 0.000 - - 0.000 4.3) LMMT -Ship / Shore Production Support - - 2.196 - - 0.162 - - 0.145 - - 0.016 - - 0.000 - - 0.016 Subtotal: Support - Adv Tact Data Link Sys (ATDLS) PRODUCTION SUPPORT Cost - - 3.531 - - 0.546 - - 0.308 - - 0.016 - - 0.000 - - 0.016 Support - Adv Tact Data Link Sys (ATDLS) Training Cost 5.1) ATDLS Training - - 20.339 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Adv Tact Data Link Sys (ATDLS) Training Cost - - 20.339 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 102.127 - - 15.103 - - 13.514 - - 8.875 - - 0.000 - - 8.875 Remarks: BLI 2614 procures data link components (e.g. circuit cards, routers, antennas, shock mounts, etc.) to replace obsolete ones. There is integration and testing of these components lasting 6-9 months, which causes procurements to be installed in the following fiscal year. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 5 of 15 P-1 Line #51 Volume 2 - 319 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Unit cost and installation cost varies by ship/site due to different configurations required for both shore and ship systems. (†) indicates the presence of a P-5a Footnotes: (1) Link 16 TTNT AS-4557 Antenna: Cost element name changed to align with revised program acquisition strategy. Total cost decrease from FY26 to FY27 due lower unit cost of the AS-4557 antenna. Quantities derived by ship maintenance availabilities. Unit cost informed by Link 16 Independent Government Cost Estimate. (2) LMMT Ship: Total cost decrease from FY26 to FY27 due to lower unit cost provided by the LMMT Independent Government Cost Estimate. Quantities represent modernization plan defined by the revised program acquisition strategy. (3) LMMT Ship: Total cost decrease from FY26 to FY27 due to lower FY27 quantity and lower unit cost. Quantities represent modernization plan defined by the revised program acquisition strategy. FY27 unit cost informed by LMMT Independent Government Cost Estimate. (4) (5) (6) (7) Link 16 TTNT AS-4557 Antenna Install: Total cost decrease from FY26 to FY27 due to lower installation cost based on recent historic actual installation costs. Link 16 TTNT AS-4557 Antenna DSA: FY26 to FY27 increase of $0.272M due to increase in planning yard requirements based on recent historic actuals. LMMT - Ship Install: FY26 to FY27 total cost increase due to increase in shipboard installations. Updated install cost informed by historic afloat installations. LMMT - Shore Install: FY26 to FY27 total cost increase due to increase in shore-based installations. Updated install cost informed by historic shore installations. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 6 of 15 P-1 Line #51 Volume 2 - 320 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Cost Elements O O C 2.1.1) C2P - Terminal Shore FY 2025 (8) P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Method/Type or Funding Vehicle VARIOUS Manufacturers / Various Locations Contractor and Location Item Number / Title [DODIC]: 1 / Adv Tact Data Link Sys (ATDLS) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) C / FFP NAVWAR Apr 2025 Apr 2026 3 801.000 Y Qty (Each) RFP Issue Date 2.1.2) Link 16 TTNT AS-4557 Antenna 2025 NIWC Pacific / San Diego, CA WR NIWC Jan 2025 Oct 2025 23 234.826 Y 2.1.2) Link 16 TTNT AS-4557 Antenna 2026 NIWC Pacific / San Diego, CA WR NIWC Jan 2026 Oct 2026 16 239.556 Y 2.1.2) Link 16 TTNT AS-4557 Antenna 2027 NIWC Pacific / San Diego, CA WR NIWC Jan 2027 Oct 2027 18 135.875 Y 2.1.3) LMMT - Ship 2025 NIWC LANT / Charleston, SC WR NIWC Jan 2025 Apr 2025 6 126.833 Y Oct 2017 2.1.3) LMMT - Ship 2026 NIWC PAC / San Diego, CA WR NIWC Jan 2026 Jan 2027 7 133.286 Y Oct 2017 2.1.3) LMMT - Ship 2027 NIWC PAC / San Diego, CA WR NIWC Oct 2026 Oct 2027 11 71.408 Y Oct 2017 2.1.4) LMMT - Shore 2025 NIWC LANT / Charleston, SC WR NIWC Jan 2025 Apr 2025 14 126.857 Y 2.1.4) LMMT - Shore 2026 (9) NIWC PAC / San Diego, CA WR NIWC Jun 2026 Jun 2027 10 133.400 Y (10) NIWC PAC / San Diego, CA WR NIWC Jun 2027 Jun 2028 3 71.408 Y 2.1.4) LMMT - Shore 2027 Footnotes: (8) (9) Vendors: SAIC, Serco and Mirco USA New manufacturer reflects updated lead times to include system assembly and integration. (10) New manufacturer reflects updated lead times to include system assembly and integration. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 7 of 15 P-1 Line #51 Volume 2 - 321 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 410.510 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 410.510 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) 410.510 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 53.355 45.225 43.883 0.000 43.883 53.095 53.221 58.459 - - - - - - - - 53.355 45.225 43.883 0.000 43.883 53.095 53.221 58.459 - - - - - - - - 53.355 45.225 43.883 0.000 43.883 53.095 53.221 58.459 To FY 2031 Complete 60.537 Continuing - Continuing - 60.537 Continuing - Total - Continuing - - 60.537 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Unit cost and installation cost varies by ship/site due to different configurations required for both shore and ship systems. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 8 of 15 P-1 Line #51 Volume 2 - 322 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) FY 2025 FY 2026 Related RDT&E PEs: 0205604N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) B Kits Recurring 1.1.1) Link 16 Terminal Ship - NonOrganic / - - / - - 1.1.2) Link 16 TTNT MOS-J Upgrade Kit - NonOrganic 213 / 153.383 - / - - / - - / - 4 / 2.452 - / - 4 / 2.452 4 / 2.501 4 / 2.551 3 / 1.952 3 / 1.991 - / - 18 / 11.447 1.1.3) Link 16 TTNT MOS Mod Upgrade Kit - - / - - / - - / - 14 / 10.080 - / - 14 / 10.080 11 / 8.078 7 / 5.244 7 / 5.348 9 / 7.014 - / - 48 / 35.764 - / - - / - - / - 18 / 5.328 - / - 18 / 5.328 15 / 4.529 11 / 3.388 10 / 3.141 12 / 3.845 - / - 66 / 20.231 (11) NonOrganic (12) 1.1.4) Link 16 TTNT AS-4775B Antenna - NonOrganic (13) 1.1.5) C2P Terminal Ship - NonOrganic 1.1.6) C2P Mod - NonOrganic 86 / 71.199 - (14) Subtotal: Recurring Subtotal: Adv Tact Data Link Sys (ATDLS) Subtotal: Procurement, All Modification Items 299 / 224.582 / 224.582 - 29 / 21.200 15 / 12.014 / - / 224.582 - 44 / 31.229 - 59 / 43.243 / 43.243 - 4 / 3.208 / - / 43.243 - - - / - / 24.408 - 33 / 24.408 / 24.408 - - - / - 16 / 14.808 - / - 16 / 14.808 / 32.668 - / - - 52 / 32.668 - / - 52 / 32.668 / 32.668 - / - - - - / - - / - - / - / 32.668 / 32.668 - / - / - 20 / 18.880 / 33.988 - 50 / 33.988 / 33.988 - - - / - / - 12 / 11.555 / 22.738 - 34 / 22.738 / 22.738 - - - / - / - 17 / 16.696 / 27.137 - 37 / 27.137 / 27.137 - - - / - / - Continuing Continuing Continuing 24 / 24.043 - / 36.893 Continuing Continuing 48 / 36.893 Continuing Continuing / 36.893 Continuing Continuing - - / - Continuing 89 / 85.982 Support (All Modification Items) 2.1) Link 16 TTNT DSA - (15) 2.2) Link 16 TTNT Production Support 2.3) C2P Mod DSA - (16) 2.4) C2P Mod Production Support - (17) Subtotal: Support - / 11.750 - / 0.674 - / 0.378 - / 1.083 - / 0.000 - / 1.083 - / 1.130 - / 0.800 - / 0.816 - / 0.832 Continuing Continuing / 7.773 - / 1.721 - / 1.176 - / 0.667 - / 0.000 - / 0.667 - / 0.680 - / 0.694 - / 0.708 - / 0.722 Continuing Continuing / 12.610 - / 0.794 - / 1.407 - / 1.419 - / 0.000 - / 1.419 - / 1.488 - / 1.324 - / 1.521 - / 1.473 Continuing Continuing - / 0.000 - / 0.496 - / 0.606 - / 0.618 - / 0.630 - / 0.643 Continuing Continuing / - - / 3.665 - / 3.904 - / 3.436 - / 3.675 - / 3.670 Continuing Continuing / 0.000 - / 7.550 - / 15.203 - / 27.047 - / 27.647 - / 19.974 Continuing Continuing / - - / 7.550 - / 15.203 - / 27.047 - / 27.647 - / 19.974 Continuing Continuing 60.537 Continuing Continuing / 5.364 - / 0.721 - / 0.157 - / 0.496 / 37.497 - / 3.910 - / 3.118 - / 3.665 - Installation Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) - / 148.431 - / 6.202 - / 17.699 - / 7.550 Subtotal: Installation - / 148.431 - / 6.202 - / 17.699 - / 7.550 - Total Total Cost (Procurement + Support + Installation) LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy 410.510 53.355 45.225 43.883 0.000 UNCLASSIFIED Page 9 of 15 43.883 53.095 53.221 P-1 Line #51 58.459 Volume 2 - 323 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Manufacturer Information Manufacturer Name: Multiple Vendors (Link 16 Terminal Ship) Manufacturer Location: CEDAR RAPIDS, IA (18) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Jan 2026 FY 2027 FY 2028 FY 2030 FY 2031 FY 2030 FY 2031 Jan 2027 Manufacturer Name: Multiple Vendors (C2P Terminal Ship) Manufacturer Location: Reston, VA (19) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Jan 2026 Jan 2027 Manufacturer Name: Multiple Vendors (Link 16 TTNT MOS MOD Upgrade Kit) FY 2027 FY 2028 FY 2029 Manufacturer Location: CEDAR RAPIDS, IA (20) Administrative Leadtime (in Months): 3 Dates FY 2029 Production Leadtime (in Months): 12 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2025 FY 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Manufacturer Name: NIWC PAC (Link 16 TTNT MOS-J Upgrade Kit) Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 Contract Dates Delivery Dates FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2028 Manufacturer Name: Multiple Vendors (C2P Mod) Manufacturer Location: Reston, VA (21) Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 24 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2033 Manufacturer Name: NIWC PAC (Link 16 TTNT AS-4775B Antenna) Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates FY 2025 Contract Dates LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 UNCLASSIFIED Page 10 of 15 P-1 Line #51 Volume 2 - 324 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Manufacturer Information Dates FY 2025 FY 2026 Delivery Dates FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: Link 16 Terminal Ship Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 200 / 84.472 13 / 1.924 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 44 / 6.644 - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 29 / 4.466 - / - - / - - / - - / - Continuing Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 29 / 4.466 - / - - / - - / - - / - Total 200 / 84.472 13 / 1.924 29 / 4.466 44 / 6.644 0 / 0.000 29 / 4.466 0 / 0.000 Continuing Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 200 - 4 4 5 - 15 15 14 - 10 10 9 - - - - - - - - - - - - - - - - - 286 Out 192 4 4 - 15 15 14 - 10 10 - - - - - - - - - - - - - - - - 286 8 - 5 9 Method of Implementation: [none specified]:: Installation Name: Link 16 TTNT MOS-J Upgrade Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 4 / 2.252 - / - - / - - / - 0 / 0.000 4 / 2.252 FY 2028 - / - - / - - / - - / - - / - - / - - 4 / 2.297 - / - - / - 0 / 0.000 4 / 2.297 Installation Cost LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 11 of 15 / - P-1 Line #51 Volume 2 - 325 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Installation Information Method of Implementation: [none specified]:: Installation Name: Link 16 TTNT MOS-J Upgrade Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.343 - / - 0 / 0.000 4 / 2.343 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.792 0 / 0.000 3 / 1.792 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.828 3 / 1.828 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - 4 / 2.252 Installation Cost 4 / 2.297 4 / 2.343 3 / 1.792 / - - 3 / 1.828 / - 18 / 10.512 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 2 1 1 - 1 2 1 - 1 2 1 - 1 1 1 3 18 Out - - - - - - - - - - - - - - 2 1 1 2 1 2 1 1 4 18 - 1 - 1 - 1 - Method of Implementation: [none specified]:: Installation Name: Link 16 TTNT MOS Mod Upgrade Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 14 / 8.397 - / - - / - - / - 0 / 0.000 14 / 8.397 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 6.730 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 4.368 - / - 0 / 0.000 7 / 4.368 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 4.456 0 / 0.000 7 / 4.456 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 5.843 9 / 5.843 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - Installation Cost LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 12 of 15 14 / 8.397 11 / 6.730 11 / 6.730 P-1 Line #51 7 / 4.368 7 / 4.456 / - 9 / 5.843 - / - 48 / 29.794 Volume 2 - 326 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Installation Information Method of Implementation: [none specified]:: Installation Name: Link 16 TTNT MOS Mod Upgrade Kit Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 5 5 4 - 4 4 3 - 2 3 2 - 2 3 2 9 48 Out - - - - - - - - - - - - - - 5 5 4 4 2 3 2 3 11 48 - 4 - 3 - 2 - Method of Implementation: [none specified]:: Installation Name: Link 16 TTNT AS-4775B Antenna Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 18 / 4.554 - / - - / - - / - 0 / 0.000 18 / 4.554 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 3.871 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 11 / 2.895 - / - 0 / 0.000 11 / 2.895 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 2.685 0 / 0.000 10 / 2.685 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 3.286 12 / 3.286 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - Installation Cost 15 / 3.871 18 / 4.554 15 / 3.871 11 / 2.895 - 10 / 2.685 / - - 12 / 3.286 / - 66 / 17.291 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 6 6 6 - 5 5 5 - 4 4 3 - 3 4 3 12 66 Out - - - - - - - - - - - - - - 6 6 5 5 4 4 3 4 15 66 - 6 - 5 - 3 - Method of Implementation: [none specified]:: Installation Name: C2P Terminal Ship Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 80 / 63.959 6 / 4.278 - - - - - - - - 0 / 0.000 86 / 68.237 LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy / - / - / - UNCLASSIFIED Page 13 of 15 / - / - / - P-1 Line #51 / - / - Volume 2 - 327 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Installation Information Method of Implementation: [none specified]:: Installation Name: C2P Terminal Ship Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - Continuing Continuing FY 2026 - / - - / - - / - 4 / 3.084 0 / 0.000 4 / 3.084 - / - - / - - / - - / - Continuing FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 3.084 - / - - / - - / - - / - Installation Cost Total 80 / 63.959 15 / 11.055 6 / 4.278 - 15 / 11.055 / - - 4 / 3.084 / - 0 / 0.000 Continuing Continuing Continuing Installation Schedule FY 2025 PYS Q1 Q2 In 80 - - Out 72 8 - FY 2026 Q3 Q4 Q1 Q2 3 3 - - - 3 3 FY 2027 Q3 Q4 Q1 Q2 7 8 - - - - 7 8 FY 2028 FY 2029 FY 2030 FY 2031 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 2 2 - - - - - - - - - - - - - - - - - 105 - - - - - - - - - - - - - - - - 105 - - 2 2 Method of Implementation: [none specified]:: Installation Name: C2P Mod Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 14.149 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 20 / 18.041 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 11.041 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 15.954 17 / 15.954 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 22.974 24 / 22.974 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - Installation Cost LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 14 of 15 16 / 14.149 16 / 14.149 P-1 Line #51 20 / 18.041 20 / 18.041 12 / 11.041 12 / 11.041 - / - 41 / 38.928 - / - 89 / 82.159 Volume 2 - 328 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2614 / Adv Tact Data Link Sys (ATDLS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Adv Tact Data Link Sys (ATDLS) MDAP/MAIS Code: Modification Item 1 of 1: Adv Tact Data Link Sys (ATDLS) Installation Information Method of Implementation: [none specified]:: Installation Name: C2P Mod Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 6 5 5 - 7 7 6 - 4 4 4 41 89 Out - - - - - - - - - - - - - - - - - - 6 5 7 7 4 4 45 89 - 5 - 6 - Footnotes: (11) Link 16 TTNT MOS-J Upgrade Kit: New Cost Element added due to revised program acquisition strategy to procure Link 16 TTNT MOS-J Upgrade Kit instead of full Link 16 Terminals. Quantities derived by ship maintenance availabilities. FY27 unit cost informed by Link 16 Independent Government Cost Estimate. (12) Link 16 TTNT MOS Mod Upgrade Kit: New Cost Element added due to revised program acquisition strategy to procure Link 16 TTNT MOS Mod Upgrade Kit instead of full Link 16 Terminals. Quantities derived by ship maintenance availabilities. FY27 unit cost informed by Link 16 Independent Government Cost Estimate. (13) Link 16 TTNT AS-4775B Antenna: New Cost Element added due to revised program acquisition strategy to procure new antenna to equip afloat and shore units with full TTNT radiofrequency transmit and receive capacity. Quantities derived by ship maintenance availabilities. FY27 unit cost informed by Link 16 Independent Government Cost Estimate. (14) C2P Mod: New Cost Element added due to revised program acquisition strategy to extend C2P procurements to a 2-year lead time. Quantities derived by ship maintenance availabilities. FY27 unit cost informed by Link 16 Independent Government Cost Estimate. (15) Link 16 TTNT DSA: FY26 to FY27 increase of $0.705M due to increase in planning yard requirements based on recent historic actuals. Total costs in FY27 include DSA costs for Link 16 TTNT Upgrade Kits and the AS-4775B Antenna. (16) (17) (18) (19) (20) (21) C2P Mod DSA: FY26 to FY27 increase of $0.012M estimated planning yard requirements. C2P Mod Production Support: Total increase of $0.339M from FY26 to FY27 is to support start of new C2P Mod variant procurements of 16 units in FY27. Link 16 Terminal Ship Full Production Contract has 2 vendors on a multi-vendor Basic Award Agreement: DATA LINK SOLUTIONS and DRS LAUREL TECHNOLOGIES C2P Terminal Ship Full Production Contract has 3 vendors on a multi-vendor Basic Award Agreement: SAIC, SERCO INC., and MICRO USA INC. Link 16 TTNT MOS MOD Upgrade Kit production contract has 2 vendors on a multi-vendor Basic Award Agreement: DATA LINK SOLUTIONS and DRS LAUREL TECHNOLOGIES C2P Mod production contract has 3 vendors on a multi-vendor Basic Award Agreement: SAIC, SERCO INC., and MICRO USA INC. LI 2614 - Adv Tact Data Link Sys (ATDLS) Navy UNCLASSIFIED Page 15 of 15 P-1 Line #51 Volume 2 - 329 === page 410 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 330 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 80.242 3.645 3.489 16.167 0.000 16.167 2.998 3.042 3.098 - - - - - - - - - 80.242 3.645 3.489 16.167 0.000 16.167 2.998 3.042 3.098 - - - - - - - - - 80.242 3.645 3.489 16.167 0.000 16.167 2.998 3.042 3.098 To FY 2031 Complete 3.164 Continuing - Continuing - 3.164 Continuing - Total - Continuing - - 3.164 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Starting in FY2027, Joint Automated Deep Operations Coordination System (JADOCS) will no longer be funded with OPN and all JADOCS P5a Cost Elements have been removed. JADOCS will continue support of sustainment activities under OMN Program Element 0204660N / Subhead 1C1C / Project Unit 70100. Funding starting in FY2027 includes Global Command and Control System-Maritime (GCCS-M) and the Navy fielded portions of GCCS-Joint (GCCS-J). Prior to FY2027, includes Global Command and Control System-Maritime (GCCS-M), the Navy fielded portions of GCCS-Joint. GCCS-M is the Maritime implementation of the United States (U.S.) Global Command and Control System (GCCS). It provides Maritime Commanders at all echelons of command with a single, integrated, and scalable Command, Control, Communication, Computers and Intelligence (C4I) system that fuses, correlates, filters, maintains and displays location and attributes information on friendly, hostile, and neutral land, sea, and air forces. It takes this information and integrates it with available intelligence and environmental information to support commander decision making. It operates in near real-time, constantly updating unit positions and other situational awareness data. GCCS-M also records data in appropriate databases and maintains a history of changes to those records. System operators use the data to construct relevant tactical pictures using maps, charts, topography overlays, oceanographic overlays, meteorological overlays, imagery and all-source intelligence information coordinated into a Common Operational Picture (COP) that can be shared locally and with other sites. GCCS-M v4.1.5.X provides track management for battle management aids (BMAs) critical to "Fight Tonight". Continuous delivery of GCCS-M v4.1.5 and associated training is required to support the Fleet increased demand for deployment of Carrier Strike Groups. GCCS-M is not a weapon system, but receives data from, and interfaces with Navy integrated weapons systems. Navy Commanders review and evaluate the general tactical situation, plan actions and operations, direct forces, synchronize tactical movements, and integrate force maneuver with firepower. GCCS-M operates on General Service (GENSER) Secret networks in a variety of environments and supports joint, coalition and allied forces. GCCS-M is implemented Afloat and at Ashore fixed command centers. Increment 1 includes all GCCS-M software versions 4.0 and earlier. Increment 2 is GCCS-M 4.1. GCCS-Joint (GCCS-J) provides a fused picture of the battlespace within a modern command and control, communications and computer system that meets Joint warfighter and Distributed Command, Control & Communication (C3) needs. GCCS-J incorporates the core planning and assessment tools required by Combatant Commanders and their subordinate Joint Task Force Commanders to make accurate and timely decisions. GCCS-J is DoW's Joint Command and Control (C2) system of record and an essential component for successful implementation of the operational concepts of dominant maneuver, precision engagement, and full-dimension protection. GCCS-J provides situational awareness, imagery exploitation, indications and warning, collaborative planning, course-of-action development, intelligence mission support, and real-time combat execution capabilities needed to accelerate operational tempo and conduct successful military operations in the joint modern warfare environment in support of Pinnacle 27 and Fight from the Maritime Operations Center (FFTM) operations. FY27 funding also includes a one-time increase to support full hardware/software modernization of the current baseline capability at Joint Staff critical sites. This capability will provide real-time Common Operating Picture (COP) of the battlespace to support Joint and multi-national operations. LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 1 of 7 P-1 Line #52 Volume 2 - 331 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / FA010 GCCS-M Afloat]: GCCS-M Afloat provides Command and Control capability to Force Level Ships (e.g. CVN Carriers, LCC Command Ships, LHA and LHD Amphibious Ships), Unit Level Ships (e.g. CG Cruisers, DDG Destroyers, MCM Mine Countermeasure Ships, LPD and LSD Amphibious Ships, FF/LCS Littoral Combat Ships, PC Coastal Patrol Ships), Submarines (e.g. SSN/SSBN/SSGN Submarines), the Software Support Activity (SSA), and the In-Service Engineering Activity (ISEA). [P5 / FA040 GCCS (Joint) Support Equipment]: Global Command and Control System- Joint (GCCS-J) is a Department of War (DoW) Program of Record managed by the Defense Information Systems Agency (DISA) GCCS-J Program Management Office (PMO). The GCCS-J system requirements, software release schedule, and system fielding plan are determined by the DISA GCCS-J PMO in coordination with the Joint Staff. GCCS-J supports the Joint Staff and Combatant Commanders by providing Command, Control, Communication, Computers and Intelligence (C4I) data processing capabilities, including status of forces and support requirements for use in national security decision making, force preparation and operational planning and execution. Global Command and Control System- Joint (GCCS-J) provides support for Fleet Communications Center interfacing with deployed units and other fixed Fleet and Joint Command Centers. There are currently 17 fielded and supported Navy GCCS-J Program of Record sites. [P5 / FA060 Joint Automated Deep Operations Coordination System (JADOCS)]: Provide funding for the Navy fielding of JADOCS software on new installation hardware. JADOCS is required to provide the capability to coordinate joint targeting and mission assignment for time sensitive targets and other rapid-response missions across Functional Component Commanders, Joint and Combined Force Commanders, Geographic Combatant Commanders, and Special Operations Commanders. Starting in FY2027, Joint Automated Deep Operations Coordination System (JADOCS) will no longer be funded with OPN and all JADOCS P5a Cost Elements have been removed. JADOCS will continue support of sustainment activities under OMN Program Element 0204660N / Subhead 1C1C / Project Unit 70100. LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 2 of 7 P-1 Line #52 Volume 2 - 332 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Navy Command and Control System (NCCS) P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 80.242 - / 3.645 - / 3.489 - / 16.167 - / 0.000 - / 16.167 - / 80.242 - / 3.645 - / 3.489 - / 16.167 - / 0.000 - / 16.167 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 budget procures and installs Global Command and Control System - Joint (GCCS-J) Ashore workstations, Local Area Network (LAN) hardware, software, and communications equipment and Global Command and Control System - Maritime (GCCS-M) software. FY2026 to FY2027 increase in the amount of $12.678M is due to the increase requirement to support United States Indo-Pacific Command (USINDOPACOM) Fleet key priorities and to support hardware/ software modernization of the current baseline at the Joint Staff critical sites. LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 3 of 7 P-1 Line #52 Volume 2 - 333 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Navy Command and Control System (NCCS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 80.242 3.645 3.489 16.167 0.000 16.167 - - - - - - 80.242 3.645 3.489 16.167 0.000 16.167 - - - - - - 80.242 3.645 3.489 16.167 0.000 16.167 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway - Consolidated Prior Year Cost Recurring Cost 1.1.1) Consolidated Prior Year - - 19.052 - - - - - - - - - - - - - - - - - 19.052 - - - - - - - - - - - - - - - - - 19.052 - - - - - - - - - - - - - - - 8.961 456 4.086 1.160 25 0.029 1.185 27 0.032 1.208 45 0.054 - - - 1.208 45 0.054 Subtotal: Recurring Cost - - 4.086 - - 0.029 - - 0.032 - - 0.054 - - - - - 0.054 Subtotal: Flyaway - FA010 GCCS-M Afloat Cost - - 4.086 - - 0.029 - - 0.032 - - 0.054 - - - - - 0.054 11.370 92.000 0.552 89.000 0.534 79.000 0.474 - - - 79.000 Requirements (1) Subtotal: Recurring Cost Subtotal: Flyaway Consolidated Prior Year Cost Flyaway - FA010 GCCS-M Afloat Cost Recurring Cost 2.1.1) GCCS-M Increment 2 Afloat (†) Flyaway - FA040 GCCS (Joint) Support Equipment Cost Recurring Cost 3.1.1) GCCS (Joint) Support Equipment (2) (†) 119.684 95 LI 2618 - Navy Command and Control System (NCCS) Navy 6 6 UNCLASSIFIED Page 4 of 7 6 P-1 Line #52 6 0.474 Volume 2 - 334 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Navy Command and Control System (NCCS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) 3.1.2) GCCSJ INDOPACOM FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 4.921 - - - - - 4.921 Subtotal: Recurring Cost - - 11.370 - - 0.552 - - 0.534 - - 5.395 - - - - - 5.395 Subtotal: Flyaway - FA040 GCCS (Joint) Support Equipment Cost - - 11.370 - - 0.552 - - 0.534 - - 5.395 - - - - - 5.395 Priorities (3) Flyaway - FA060 Joint Automated Deep Operations Coordination System (JADOCS) Cost Recurring Cost (†) 7.661 62 0.475 1.000 0.004 1.000 0.004 - - - - - - - - - Subtotal: Recurring Cost - - 0.475 - - 0.004 - - 0.004 - - - - - - - - - Subtotal: Flyaway - FA060 Joint Automated Deep Operations Coordination System (JADOCS) Cost - - 0.475 - - 0.004 - - 0.004 - - - - - - - - - 4.1.1) JADOCS 4 4 Flyaway - ASHORE INSTALLATIONS - FA776 Non FMP Cost Recurring Cost 5.1.1) GCCS-M Ashore - - - - - - - - - - - 0.450 - - - - - 0.450 - - 7.450 - - 0.488 - - 0.470 - - 0.434 - - - - - 0.434 (5) - - 2.438 - - 0.164 - - 0.148 - - 0.125 - - - - - 0.125 Subtotal: Recurring Cost - - 9.888 - - 0.652 - - 0.618 - - 1.009 - - - - - 1.009 Subtotal: Flyaway ASHORE INSTALLATIONS FA776 Non FMP Cost - - 9.888 - - 0.652 - - 0.618 - - 1.009 - - - - - 1.009 5.1.2) GCCS (Joint) Support Equipment Installations (4) 5.1.3) GCCS-J PreInstallation Design Flyaway - AFLOAT INSTALLATIONS - FA777 FMP Cost Recurring Cost 6.1.1) JADOCS - - 0.921 - - 0.093 - - 0.089 - - - - - - - - - (6) - - 34.042 - - 2.267 - - 2.184 - - 3.845 - - - - - 3.845 Subtotal: Recurring Cost - - 34.963 - - 2.360 - - 2.273 - - 3.845 - - - - - 3.845 Subtotal: Flyaway - AFLOAT INSTALLATIONS - FA777 FMP Cost - - 34.963 - - 2.360 - - 2.273 - - 3.845 - - - - - 3.845 6.1.2) GCCS-M Increment 2 Afloat Support - FA555 Production Support Cost LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 5 of 7 P-1 Line #52 Volume 2 - 335 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Navy Command and Control System (NCCS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 7.1) GCCS-M Integration Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($ K) (Each) ($ M) - - - - - - - - - - - 5.840 - - - - - 5.840 7.2) GCCS (Joint) Production Engineering Support - - 0.408 - - 0.048 - - 0.028 - - 0.024 - - - - - 0.024 Subtotal: Support - FA555 Production Support Cost - - 0.408 - - 0.048 - - 0.028 - - 5.864 - - - - - 5.864 Gross/Weapon System Cost - - 80.242 - - 3.645 - - 3.489 - - 16.167 - - 0.000 - - 16.167 NRE (7) Remarks: - Global Command and Control System - Maritime (GCCS-M) Afloat install quantities also include tech refresh units. - For GCCS-M software-only installations, Other Procurement, Navy (OPN) is the appropriate fund source when the GCCS-M installation is an incidental cost to the Common Computing Environment (CCE)/ Consolidated Afloat Networks and Enterprise Services (CANES) hardware installation. - The unit costs for GCCS-M and Joint Air Deep Operations Command System (JADOCS) vary based on the type of platform being installed on, location of install, existing configuration of starting baseline, and the software version being installed. - Global Command and Control System - Joint (GCCS-J) quantities represent the number of complete unit upgrades to existing systems. The cost to upgrade each unit varies based on the number of servers, computers, and monitors and the equipment configurations. The different unit sizes and configurations result in varying unit costs. (†) indicates the presence of a P-5a Footnotes: (1) Consolidated prior year requirements include GCCS-M Increment 1 Afloat (FA010/FA777), GCCS-M Increment 2 Ashore (FA020/FA776) GCCS-M Increment 2 Ashore Training Curriculum (FA666), GCCS-M Increment 2 Ashore Production Support (FA555), JADOCS Ashore Installations (FA776). (2) (3) GCCS (Joint) Support Equipment - Unit cost decrease in FY2027 reflects rate changes. GCCS-J INDOPACOM Priorities - FY2027 funding is a one-time increase to support full hardware/software modernization of the current baseline capability at Joint Staff critical sites. This capability will provide real-time Common Operating Picture (COP) of the battlespace to support Joint and multi-national operations. (4) (5) (6) (7) GCCS (Joint) Support Equipment Installations - decrease in FY 2027 installations reflects rate changes. GCCS (Joint) Pre-Installation Design - Unit cost decrease in FY2027 reflects rate changes. GCCS-M Increment 2 Afloat- GCCS-M installation costs increase in FY2027 due to increase in requirements to support United States Indo-Pacific Command (USINOPACOM) Fleet key priorities. GCCS-M Integration NRE - GCCS- integration costs increase in FY2027 due to increase in requirements to support United States Indo-Pacific Command (USINOPACOM) Fleet key priorities. LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 6 of 7 P-1 Line #52 Volume 2 - 336 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 2618 / Navy Command and Control System (NCCS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Cost Elements 2.1.1) GCCS-M Increment 2 Afloat O O C FY 2025 Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 1 / Navy Command and Control System (NCCS) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) NIWC Atlantic/Pacific (8) / NAVWAR WR NAVWAR Nov 2024 Jan 2025 25 1.160 Y / NAVWAR WR NAVWAR Nov 2025 Jan 2026 27 1.185 Y NAVWAR Nov 2026 Jan 2027 45 1.208 Y 2.1.1) GCCS-M Increment 2 Afloat 2026 NIWC Atlantic/Pacific (8) 2.1.1) GCCS-M Increment 2 Afloat 2027 NIWC Atlantic/Pacific (8) / NAVWAR WR 3.1.1) GCCS (Joint) Support Equipment 2025 NIWC Atlantic/NAVWAR / NAVWAR WR NAVWAR Jan 2025 Apr 2025 6 92.000 Y 3.1.1) GCCS (Joint) Support Equipment 2026 NIWC Atlantic/NAVWAR / NAVWAR WR NAVWAR Jan 2026 Apr 2026 6 89.000 Y 3.1.1) GCCS (Joint) Support Equipment 2027 NIWC Atlantic/NAVWAR / NAVWAR C / TBD NAVWAR Jan 2027 Apr 2027 6 79.000 Y 4.1.1) JADOCS 2025 NIWC Pacific / San Diego, CA WR NAVWAR Nov 2024 Jan 2025 4 1.000 Y 4.1.1) JADOCS 2026 NIWC Pacific / San Diego, CA WR NAVWAR Nov 2025 Jan 2026 4 1.000 Y RFP Issue Date Footnotes: (8) For GCCS-M Increment 1 Afloat, Increment 2 Afloat; Naval Information Warfare Centers (NIWC) Pacific and Atlantic are procuring, integrating and installation agents. There are multiple hardware and software contracts awarded under each of these cost elements. LI 2618 - Navy Command and Control System (NCCS) Navy UNCLASSIFIED Page 7 of 7 P-1 Line #52 Volume 2 - 337 === page 418 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 338 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2622 / Minesweeping System Replacement Program Elements for Code B Items: 0204302N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 202.032 202.032 202.032 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 16.808 16.426 14.879 0.000 14.879 15.437 15.695 16.010 - - - - - - - - 16.808 16.426 14.879 0.000 14.879 15.437 15.695 16.010 - - - - - - - - 16.808 16.426 14.879 0.000 14.879 15.437 15.695 16.010 To FY 2031 Complete 16.325 Continuing - Continuing - 16.325 Continuing - Total - Continuing - - 16.325 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Magnetic Silencing Facility Upgrades support hardware, auxiliary systems, and support in association with the upgrade of current aging or new installation of CONUS and Outside Continental United States (OCONUS) Magnetic Silencing Facilities in order for the calibration of new Open-Loop Magnetic Systems or Advanced Degaussing System ships and submarines to be accomplished for worldwide operation. Upgrades obsolete high-power equipment to provide the necessary magnetic field for ensuring current and future navy ships and submarines meet requirements for Electromagnetic Signature Requirements and reduces susceptibility to Electro-Magnetic threat systems. LI 2622 - Minesweeping System Replacement Navy UNCLASSIFIED Page 1 of 3 P-1 Line #53 Volume 2 - 339 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2622 / Minesweeping System Replacement Program Elements for Code B Items: 0204302N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 2 / MAGNETIC SILENCING FACILITY UPGRADES - / 202.032 - / 16.808 - / 16.426 - / 14.879 - / 0.000 - / 14.879 P-40 Total Gross/Weapon System Cost - / 202.032 - / 16.808 - / 16.426 - / 14.879 - / 0.000 - / 14.879 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 2622 - Minesweeping System Replacement Navy UNCLASSIFIED Page 2 of 3 P-1 Line #53 Volume 2 - 340 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2622 / Minesweeping System Replacement Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / MAGNETIC SILENCING FACILITY UPGRADES MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 16.808 16.426 14.879 0.000 14.879 - Gross/Weapon System Cost ($ in Millions) 202.032 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 202.032 Plus CY Advance Procurement ($ in Millions) - - - - - 16.808 16.426 14.879 0.000 14.879 - Total Obligation Authority ($ in Millions) 202.032 FY 2027 Total - - - - - 16.808 16.426 14.879 0.000 14.879 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - LV085 - MAGNETIC SILENCING FACILITY UPGRADES Cost Recurring Cost 1.1.1) MSF MEASUREMENT SYSTEM UPGRADE 202,032.000 1 202.032 - - 16.808 - - 16.426 - - 14.879 - - - - - 14.879 Subtotal: Recurring Cost - - 202.032 - - 16.808 - - 16.426 - - 14.879 - - - - - 14.879 Subtotal: Hardware - LV085 - MAGNETIC SILENCING FACILITY UPGRADES Cost - - 202.032 - - 16.808 - - 16.426 - - 14.879 - - - - - 14.879 Gross/Weapon System Cost - - 202.032 - - 16.808 - - 16.426 - - 14.879 - - 0.000 - - 14.879 LI 2622 - Minesweeping System Replacement Navy UNCLASSIFIED Page 3 of 3 P-1 Line #53 Volume 2 - 341 === page 422 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 342 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 231.335 231.335 231.335 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 37.964 45.701 43.097 0.000 43.097 43.054 43.039 42.561 - - - - - - - - 37.964 45.701 43.097 0.000 43.097 43.054 43.039 42.561 To FY 2031 Complete - Total - 42.120 Continuing - Continuing - 42.120 Continuing - Continuing - - - - - - - - - - 37.964 45.701 43.097 0.000 43.097 43.054 43.039 42.561 42.120 Continuing Continuing 1.068 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 4.514 0.147 0.989 - 0.989 1.562 1.126 1.150 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Navigation Signal Timing and Ranging Global Positioning System (NAVSTAR GPS) provides assured and protected navigation solutions to Warfighters through supported, affordable, and integrated systems, and is the primary source of positioning, navigation and timing information for the Department of War (DoW). [P5 / (1R013) Navigation Warfare (NAVWAR)]: NAVWAR ensures that U.S. military forces maintain access to the GPS in an electronically challenging battlespace, delivers the capability to deny adversaries access to and use of GPS during military operations, and serves to preserve the peaceful use of GPS. Navy GPS Enhanced User Equipment (UE) Operational Requirements Document directs that future UE will incorporate an increased anti-jam capability. NAVWAR counters the threat by increasing resistance to intentional or unintentional interference. Sea NAVWAR Strategy is to install Increment 2 Advanced Digital Antenna Production (ADAP) antennas on surface platforms. The second increment also includes a smaller antenna variant for surface platforms with Size, Weight, Power and Cost (SWAP-C) restrictions. The ADAP antenna provides simultaneous dual frequency nulling and built in testability. Procurement and installation of anti-jam GPS antennas and modernized user equipment is required to ensure the continuation of GPS signals from space in a hostile jamming environment. The Sea NAVWAR program will equip ships with anti-jam GPS antennas to ensure the continued availability of GPS to support surface combat operations and provide reliable GPS and other positioning, navigation and timing data to ship-board Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR), Combat, and Weapons Systems. [P3A / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS)]: The GPS-based PNT Service (GPNTS) system is the primary PNT system for the Navy to ensure reliable PNT capability and interoperability insertion in GPS receivers and associated Command, Control, Computers, Communications and Intelligence (C4I) and Combat Systems in a denied environment. GPNTS provides more robust and secure GPS/PNT capabilities than is currently in the Fleet. GPNTS provides precise PNT data required for combat, weapons, command, control, communications, navigation, and other systems, as well as providing the time synchronization critical to the network environments. GPNTS backfits current PNT/GPS systems and forward fit new platforms. GPNTS is an Open Architecture (OA) development, enabling rapid software and hardware based capability improvements to be inserted without a requirement for single-source contracting. GPNTS will host the US Space Force developed Military GPS User Equipment (MGUE) card, allowing access to the new more accurate and secure GPS Military-Code (M-Code) signal. GPNTS also provides the capability to migrate non-real time GPS data toward a Common Computing Environment (CCE) and provide a path for the integration of advanced navigation systems and sensors. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 1 of 14 P-1 Line #54 Volume 2 - 343 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / NAVSTAR GPS Receivers (Space) - / 76.895 - / 2.457 - / 3.460 - / 3.067 - / 0.000 - / 3.067 P-3a 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) (Ship Alt) - / 154.440 - / 35.507 - / 42.241 - / 40.030 - / 0.000 - / 40.030 P-40 Total Gross/Weapon System Cost - / 231.335 - / 37.964 - / 45.701 - / 43.097 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 43.097 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / NAVSTAR GPS Receivers (Space) P-3a 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) (Ship Alt) P-5a - / 39.399 - / 39.927 - / 39.394 - / 39.016 P-40 Total Gross/Weapon System Cost - / 43.054 - / 43.039 - / 42.561 - / 42.120 - / - - / - - / - - / - - / - - / - Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Navigation Warfare (NAVWAR) - In FY 2027, Sea NAVWAR will procure and field dual Advanced Digital Antenna Production (ADAP) Fiber Optic Antenna Link (FOAL) antennas. FY 2027 funding provides for the procurement of four (4) ADAP FOAL antennas and the installation of eleven (11) ADAP FOAL antennas procured in FY 2026. In FY 2025, the Sea NAVWAR Anti Jam ADAP antenna incurred a pricing increase of approximately 68% with follow on price escalations reaching to 88% higher than the FY 2024 pricing. This price renegotiation is primarily due to Raytheon Systems LTD UK having their first opportunity to adjust pricing since the pre-COVID era 2019 ADAP 5-Year Framework pricing was established. The vendor experienced a significant increase in material costs since the original pricing was established in 2018 due to COVID era supply chain shortages, increased inflation, and tariffs. Additionally, actual engineering hours required for ADAP production have increased, as validated by a Mechanization of Contract Administration Services (MOCAS) audit on behalf of DCMA. These increases, coupled with smaller contributing factors, necessitate adjusted pricing. Global Positioning System (GPS) - based Positioning, Navigation, & Timing Service (GPNTS) - In FY 2027, GPNTS will procure eleven (11) Full Rate Production (FRP) units, of which four (4) are for MSC platforms. In addition, FY 2027 will procure four (4) GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) to include Military Code (M-Code) GPS User Equipment (MGUE) Upgrade Kits and Non-GPS Aided Positioning for Surface and Subsurface (NoGAPSS) Upgrade Kit. The budget reflects an average unit cost for these upgrades, calculated per system. The average cost for GPNTS Enhancements for M-GUE upgrades is estimated to be approximately $25,500. The NoGAPSS Upgrades is estimated at approximately $500,000 per system. FY 2027 plans include upgrading 2 M-GUE and 2 NoGAPSS (backfit) systems, for a total of 4 upgrades. Funding for Military Sealift Command (MSC) procurements and installations correspond with both Global Positioning System (GPS) based Position Navigation and Timing System (GPNTS) and Sea NAVWAR. Military Sealift Command (MSC) installation costs have risen significantly due to factors including last minute finalization of Military Sealift Command (MSC) availability locations (30 days prior) which increase Fleet Installation Office estimates; alteration installation team expenses increase due to short time frame required for travel, per diem, and expedited shipping of government furnished equipment (GFE). Outside continental United States (OCONUS) work further contributes to overall expense increases. Finally, increased Government Installation Contract (GIC) costs, likely stemming from labor shortages and general inflationary pressures, are driving up the price of both parts and labor. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 2 of 14 P-1 Line #54 Volume 2 - 344 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY 2027 procurements for NAVWAR, GPNTS, and GPNTS Upgrade Kits will be installed in FY 2028. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 3 of 14 P-1 Line #54 Volume 2 - 345 === page 426 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NAVSTAR GPS Receivers (Space) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 76.895 2.457 3.460 3.067 0.000 3.067 - - - - - - 76.895 2.457 3.460 3.067 0.000 3.067 - - - - - - 76.895 2.457 3.460 3.067 0.000 3.067 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - (1R013) Navigation Warfare (NAVWAR) Cost Recurring Cost 1.1.1) NAVWAR (ADAP) (†) 1.1.2) NAVWAR MSC (ADAP) (†) (1) 103.806 438 45.467 482.000 1 0.482 491.000 1 0.491 157.333 9 1.416 163.000 5 0.815 167.000 10 1.670 - - 297.000 4 0.000 - - 0.000 1.188 - - 0.000 - - 297.000 0.000 4 1.188 1.1.3) NAVWAR MSC (ADAP) Engineering Change Proposal - - 0.174 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 47.057 - - 1.297 - - 2.161 - - 1.188 - - 0.000 - - 1.188 Subtotal: Hardware (1R013) Navigation Warfare (NAVWAR) Cost - - 47.057 - - 1.297 - - 2.161 - - 1.188 - - 0.000 - - 1.188 - - 7.714 - - 0.066 - - 0.046 - - 0.027 - - 0.000 - - 0.027 - - 0.381 - - 0.149 - - 0.255 - - 0.148 - - 0.000 - - 0.148 - - 8.095 - - 0.215 - - 0.301 - - 0.175 - - 0.000 - - 0.175 - - 18.052 - - 0.200 - - 0.200 - - 0.203 - - 0.000 - - 0.203 - - 0.000 - - 0.675 - - 0.684 - - 1.430 - - 0.000 - - 1.430 Support - 1R013 DSA Cost 2.1) NAVWAR (ADAP) DSA (2) 2.2) NAVWAR MSC (ADAP) DSA (3) Subtotal: Support - 1R013 DSA Cost Support - 1R013 - Installations Cost 3.1) NAVWAR (ADAP) Installations 3.2) NAVWAR MSC (ADAP) Installations (4) LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 4 of 14 P-1 Line #54 Volume 2 - 346 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NAVSTAR GPS Receivers (Space) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support - 1R013 Installations Cost Unit Cost ($ K) - FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - 18.052 - - 0.875 - - 0.884 - - 1.633 - - 0.000 - - 1.633 Support - 1R013 - Production Support Cost 4.1) NAVWAR Production Support - - 3.619 - - 0.029 - - 0.024 - - 0.000 - - 0.000 - - 0.000 4.2) MSC Production Support - - 0.072 - - 0.041 - - 0.090 - - 0.071 - - 0.000 - - 0.071 Subtotal: Support - 1R013 Production Support Cost - - 3.691 - - 0.070 - - 0.114 - - 0.071 - - 0.000 - - 0.071 Gross/Weapon System Cost - - 76.895 - - 2.457 - - 3.460 - - 3.067 - - 0.000 - - 3.067 Remarks: [Hardware] Procurement and installation of Anti-Jam (AJ) Global Positioning System (GPS) user equipment and prevention equipment is required to ensure the continued utility of GPS signals from space in a hostile jamming environment. Sea NAVWAR will procure and field dual Advanced Digital Antenna Production (ADAP) Fiber Optic Antenna Link (FOAL) antennas. The Sea Navigation Warfare (NAVWAR) program will equip ships with AJ GPS antennas to ensure the continued availability of GPS to support surface combat operations and provide reliable GPS and other navigation sensor data to ship-board Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR), Combat, and Weapons Systems. (†) indicates the presence of a P-5a Footnotes: (1) NAVWAR MSC (ADAP): 1) In FY 2025, the Sea NAVWAR Anti Jam ADAP antenna incurred a pricing increase of approximately 68% with follow on price escalations reaching to 88% higher than the FY 2024 pricing. This price re-negotiation is primarily due to Raytheon Systems LTD UK having their first opportunity to adjust pricing since the pre-COVID era 2019 ADAP 5-Year Framework pricing was established. The vendor experienced a significant increase in material costs since the original pricing was established in 2018 due to COVID era supply chain shortages, increased inflation, and tariffs. Additionally, actual engineering hours required for ADAP production have increased, as validated by a Mechanization of Contract Administration Services (MOCAS) audit on behalf of DCMA. These increases, coupled with smaller contributing factors, necessitate adjusted pricing. 2) Military Sealift Command (MSC) requires a single ADAP shipset which consists of one ADAP antenna and install. A single ADAP may range in cost from $268K to $300K depending on the Economic Order Quantity Pricing and International exchange rates relevant at time of contract award. Funding for Military Sealift Command (MSC) procurements and installations correspond with concurrent Global Positioning System (GPS) based Position Navigation and Timing System (GPNTS) procurements and installations. 3) Military Sealift Command (MSC) installation costs have risen significantly due to factors including: last minute finalization of Military Sealift Command (MSC) availability locations (30 days prior) which increase Fleet Installation Office estimates; alteration installation team expenses increase due to short time frame required for travel, per diem, and expedited shipping of government furnished equipment (GFE). Outside continental United States (OCONUS) work further contributes to overall expense increases. Finally, increased Government Installation Contract (GIC) costs, likely stemming from labor shortages and general inflationary pressures, are driving up the price of both parts and labor. (2) NAVWAR (ADAP) DSA: Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each Fiscal Year as it is a factor of the number of installations in any given fiscal year. (3) NAVWAR MSC (ADAP) 1)DSA: Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each Fiscal Year as it is a factor of the number of installations and platform in any given fiscal year. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 5 of 14 P-1 Line #54 Volume 2 - 347 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / NAVSTAR GPS Receivers (Space) MDAP/MAIS Code: (4) NAVWAR MSC (ADAP) Installations: 1) Military Sealift Command (MSC) installation costs have risen significantly due to factors including: last minute finalization of Military Sealift Command (MSC) availability locations (30 days prior) which increase Fleet Installation Office estimates; alteration installation team expenses increase due to short time frame required for travel, per diem, and expedited shipping of government furnished equipment (GFE). Outside continental United States (OCONUS) work further contributes to overall expense increases. Finally, increased Government Installation Contract (GIC) costs, likely stemming from labor shortages and general inflation coupled with COVID-19 related inflations continue to drive up parts and labor expenses. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 6 of 14 P-1 Line #54 Volume 2 - 348 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 Cost Elements 1.1.1) NAVWAR (ADAP) 1.1.1) NAVWAR (ADAP) 1.1.2) NAVWAR MSC (ADAP) 1.1.2) NAVWAR MSC (ADAP) 1.1.2) NAVWAR MSC (ADAP) O O C P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / NAVSTAR GPS Receivers (Space) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2025 RAYTHEON SYSTEMS LTD / HARLOW-UNITED KINGDOM C / FFP NAVWAR Feb 2025 Nov 2025 1 482.000 Y Nov 2024 2026 RAYTHEON SYSTEMS LTD / HARLOW-UNITED KINGDOM C / FFP NAVWAR Feb 2026 Nov 2026 1 491.000 Y Nov 2025 2025 RAYTHEON SYSTEMS LTD / HARLOW-UNITED KINGDOM C / FFP NAVWAR Feb 2025 Nov 2025 5 163.000 Y Nov 2024 2026 RAYTHEON SYSTEMS LTD / HARLOW-UNITED KINGDOM C / FFP NAVWAR Feb 2026 Nov 2026 10 167.000 Y Nov 2025 2027 RAYTHEON SYSTEMS LTD / HARLOW-UNITED KINGDOM C / FFP NAVWAR Feb 2027 Nov 2027 4 297.000 Y Nov 2026 LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 7 of 14 P-1 Line #54 (Each) Volume 2 - 349 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Prior Years 154.440 154.440 154.440 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 35.507 42.241 40.030 0.000 40.030 39.399 39.927 39.394 - - - - - - - - 35.507 42.241 40.030 0.000 40.030 39.399 39.927 39.394 - - - - - - - - 35.507 42.241 40.030 0.000 40.030 39.399 39.927 39.394 To FY 2031 Complete 39.016 Continuing - Continuing - 39.016 Continuing - Total - Continuing - - 39.016 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS): The GPS-based PNT Service (GPNTS) system is the primary PNT system for the Navy to ensure reliable PNT capability and interoperability insertion in GPS receivers and associated Command, Control, Computers, Communications and Intelligence (C4I) and Combat Systems in a denied environment. GPNTS provides more robust and secure GPS/PNT capabilities than is currently in the Fleet. GPNTS provides precise PNT data required for combat, weapons, command, control, communications, navigation, and other systems, as well as providing the time synchronization critical to the network environments. GPNTS backfits existing PNT/GPS systems and forward fits new platforms. GPNTS is an Open Architecture (OA) development, enabling rapid software and hardware-based capability improvements to be inserted without a requirement for single-source contracting. GPNTS will host the US Space Force developed Military GPS User Equipment (MGUE) card, allowing access to the new more accurate and secure GPS Military-Code (M-Code) signal. GPNTS also provides the capability to migrate non-real time GPS data toward a Common Computing Environment (CCE) and provide a path for the integration of advanced navigation systems and sensors. The Global Positioning System (GPS)-based Position, Navigation, & Timing (PNT) Service (GPNTS) budget provides for the following GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) beginning in FY 2025: Military Code (M-Code) GPS User Equipment (MGUE) Upgrade Kits and Non-GPS Aided Positioning for Surface and Subsurface (NoGAPSS) Upgrade Kits. GPNTS MGUE Upgrade Kit equipment addresses obsolescence of the Trimble SAASM Force 524D GPS receivers. The kit is required for each ship to enable M-Code capability and is dependent on the ship class configuration, as well as the date of procurement of the original shipset onboard. The GPNTS MGUE Upgrade Kit includes the M-Code GPS User Equipment receiver cards, updated processor boards, human machine interface and timing system upgrades or refurbishments. The GPNTS NoGAPSS Upgrade Kit delivers NoGAPSS capability to all GPNTS-equipped ships. The NoGAPSS Upgrade Kit addresses obsolescence of hardware components onboard ships equipped with GPNTS shipsets procured before FY21. The GPNTS NoGAPSS Upgrade kit includes hardware components that were integrated into the GPNTS Technical Data Package (TDP) starting in FY 2021 to resolve urgent obsolescence issues and enable GPNTS to support NoGAPSS capability. The GPNTS NoGAPSS Upgrade Kits in this budget will also include the MCode GPS User Equipment receiver cards. The fielding plan for GPNTS MGUE and NoGAPSS Upgrade Kits is determined by the suitable availability periods for ships requiring the upgrade. In FY 2027, GPNTS will procure eleven (11) Full Rate Production (FRP) units, of which four (4) are for MSC platforms. In addition, FY 2027 will procure four (4) GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) to include Military Code (M-Code) GPS User Equipment (MGUE) Upgrade Kits and Non-GPS Aided Positioning for Surface and Subsurface (NoGAPSS) Upgrade Kit. The budget reflects an average unit cost for these upgrades, calculated per system. The average cost for GPNTS Enhancements for M-GUE upgrades is estimated to be approximately $25,500. The NoGAPSS Upgrades is estimated at approximately $500,000 per system. FY27 plans include upgrading 2 MGUE and 2 NoGAPSS (backfit) systems, for a total of 4 upgrades. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 8 of 14 P-1 Line #54 Volume 2 - 350 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Models of Systems Affected: Shore Stations, Ships Prior Years Related RDT&E PEs: 0604280N Modification Type: Ship Alt FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) B Kits Recurring 1.1.1) GPNTS (Configuration B) - Ship - NonOrganic 1.1.2) GPNTS (MSC) - NonOrganic (5) 75 / 67.166 9 / 12.168 10 / 13.840 7 / 9.765 - / - 7 / 9.765 9 / 6.695 5 / 3.860 10 / 7.760 4 / 3.140 - / - 4 / 3.140 9 / 7.155 5 / 4.045 - / - - / - 23 / 4.759 4 / 1.056 - / - 4 / 1.056 15 / 4.020 21 / 3.297 9 / 8.909 - / - - / - - / - - (6) 1.1.3) GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) - NonOrganic (7) 1.1.4) Consolidated Prior Year Requirements - Organic (8) Subtotal: Recurring / 82.770 - Subtotal: (1R019) Global Positioning System (GPS)based Positioning, Navigation, & Timing Service (GPNTS) Subtotal: Procurement, All Modification Items 93 / 82.770 / 82.770 - / 16.028 - 14 / 16.028 / 16.028 - - / - / 26.359 - 43 / 26.359 / 26.359 - / - / 13.961 - / - - 15 / 13.961 - / - 15 / 13.961 / 13.961 - / - - - - 9 / 12.843 / 13.961 / 13.961 - / - / 24.018 - 33 / 24.018 / 24.018 - 6 / 8.718 - 32 / 16.060 / 16.060 - 2 / 2.996 Continuing Continuing 7 / 5.740 6 / 4.926 Continuing Continuing 41 / 5.084 10 / 1.680 Continuing Continuing / - / 16.060 - 5 / 7.350 - / - - / 18.174 - - - / - 9 / 8.909 / 9.602 Continuing Continuing 18 / 9.602 Continuing Continuing - 53 / 18.174 / - / 18.174 - / 9.602 Continuing Continuing Support (All Modification Items) 2.1) GPNTS Production Support - / 4.763 - / 0.603 - / 0.847 - / 0.415 - / 0.000 - / 0.415 - / 0.568 - / 0.467 - / 0.394 - / 0.179 Continuing Continuing 2.2) GPNTS (MSC) Production Support - / 0.351 - / 0.188 - / 0.386 - / 0.185 - / 0.000 - / 0.185 - / 0.429 - / 0.243 - / 0.307 - / 0.200 Continuing Continuing / 19.794 - / 2.435 - / 2.635 - / 1.699 - / 0.000 - / 1.699 - / 2.515 - / 1.964 - / 1.498 - / 0.777 Continuing Continuing - / 1.277 - / 0.503 - / 1.099 - / 0.777 - / 0.000 - / 0.777 - / 1.074 - / 0.928 - / 0.925 - / 0.721 Continuing Continuing - / 0.000 - / 0.000 - / 0.249 - / 0.060 - / 0.000 - / 0.060 - / 0.215 - / 0.189 - / 0.272 - / 0.100 - / 26.185 - / 3.729 - / 5.216 - / 3.136 / - - / 3.136 - / 4.801 - / 3.791 - / 3.396 - / 1.977 Continuing Modification Item 1 of 1: (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) - / 45.485 - / 15.750 - / 10.666 - / 22.933 Subtotal: Installation - / 45.485 - / 15.750 - / 10.666 - / 22.933 2.3) GPNTS DSA - FMP - (9) 2.4) GPNTS (MSC) DSA - FMP (10) 2.5) GPNTS eNMu Production Support Subtotal: Support - - / - - / 1.085 Continuing Installation - / 0.000 - / 22.933 - / 10.580 - / 20.076 - / 17.824 - / 27.437 - / 12.666 - / 183.417 / - - / 22.933 - / 10.580 - / 20.076 - / 17.824 - / 27.437 - / 12.666 - / 183.417 - Total LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 9 of 14 P-1 Line #54 Volume 2 - 351 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Shore Stations, Ships Prior Years Financial Plan Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) Related RDT&E PEs: 0604280N Modification Type: Ship Alt FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost (Procurement + Support + Installation) LI 2657 - NAVSTAR GPS Receivers (Space) Navy 154.440 35.507 42.241 40.030 0.000 UNCLASSIFIED Page 10 of 14 40.030 39.399 39.927 P-1 Line #54 39.394 39.016 Continuing Continuing Volume 2 - 352 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Modification Item 1 of 1: (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) Manufacturer Information Manufacturer Name: Sechan Electronics, Inc. Manufacturer Location: Lititz, PA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Name: SESCo Inc Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Feb 2025 Feb 2026 Feb 2027 Delivery Dates Feb 2026 Feb 2027 Feb 2028 Manufacturer Name: Sechan Electronics, Inc. FY 2029 Manufacturer Location: Lititz, PA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 Contract Dates Feb 2025 Feb 2026 Feb 2027 FY 2028 Delivery Dates Nov 2025 Nov 2027 Nov 2028 FY 2029 Manufacturer Name: SESCo Inc Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 Contract Dates Feb 2025 Feb 2026 Feb 2027 FY 2028 Delivery Dates Nov 2025 Nov 2026 Nov 2028 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: GPNTS (Configuration B) - Ship Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 60 / 43.235 15 / 13.125 - 75 / 56.360 / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - 9 / 7.914 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 7.914 FY 2026 - / - - / - - 10 / 8.850 - / - - / - - / - - / - 0 / 0.000 10 / 8.850 LI 2657 - NAVSTAR GPS Receivers (Space) Navy / - 10 / 8.850 0 / 0.000 UNCLASSIFIED Page 11 of 14 P-1 Line #54 Volume 2 - 353 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Modification Item 1 of 1: (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) Installation Information Method of Implementation: [none specified]:: Installation Name: GPNTS (Configuration B) - Ship Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2027 - / - - / - - / - - / - - / - - / - 7 / 6.356 - / - - / - - / - 0 / 0.000 7 / 6.356 FY 2028 - / - - / - - / - - / - - / - - / - - / - 9 / 8.325 - / - - / - 0 / 0.000 9 / 8.325 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 5.616 - / - 0 / 0.000 6 / 5.616 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 4.745 0 / 0.000 5 / 4.745 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.936 2 / 1.936 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - 5 / 4.745 2 / 1.936 123 / 100.102 Installation Cost Total 60 / 43.235 15 / 13.125 9 / 7.914 10 / 8.850 0 / 0.000 10 / 8.850 7 / 6.356 9 / 8.325 6 / 5.616 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 60 6 1 5 3 - 3 3 3 - 4 3 3 - 3 3 1 - 4 4 1 - 2 2 2 - 3 2 - 2 123 Out 54 6 6 1 5 3 3 4 3 3 3 4 4 2 2 2 123 3 - 3 - 3 - 1 - 1 - 2 - 3 2 Method of Implementation: [none specified]:: Installation Name: GPNTS (MSC) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 2.250 5 / 2.625 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 4.875 FY 2025 - / - - / - 5 / 2.752 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 2.752 FY 2026 - / - - / - - / - 10 / 6.930 - / - - / - - / - - / - 0 / 0.000 10 / 6.930 FY 2027 - / - - / - - / - - / - - / - - / - 4 / 2.824 - / - - / - - / - 0 / 0.000 4 / 2.824 FY 2028 - / - - / - - / - - / - - / - - / - - / - 9 / 6.471 - / - - / - 0 / 0.000 9 / 6.471 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.640 - / - 0 / 0.000 5 / 3.640 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.103 0 / 0.000 7 / 5.103 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 4.556 6 / 4.556 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 4 / 2.250 Installation Cost LI 2657 - NAVSTAR GPS Receivers (Space) Navy 5 / 2.625 5 / 2.752 10 / 6.930 10 / 6.930 0 / 0.000 0 / 0.000 UNCLASSIFIED Page 12 of 14 10 / 6.930 4 / 2.824 9 / 6.471 P-1 Line #54 5 / 3.640 7 / 5.103 / - 6 / 4.556 - / - 55 / 37.151 Volume 2 - 354 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Modification Item 1 of 1: (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) Installation Information Method of Implementation: [none specified]:: Installation Name: GPNTS (MSC) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 1 - 1 3 - 1 1 3 - 4 3 3 - 2 2 - - 3 3 3 - 2 2 1 - 3 2 2 6 55 Out 4 1 1 4 3 3 3 2 2 3 2 8 55 - 1 - 1 3 - 3 - 3 - 2 2 - - 3 - 1 - Method of Implementation: [none specified]:: Installation Name: GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 23 / 7.153 - / - - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - 4 / 1.400 - / - - / - - / - 0 / 0.000 4 / 1.400 FY 2028 - / - - / - - / - - / - - / - - / - - / - 15 / 5.280 - / - - / - 0 / 0.000 15 / 5.280 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 21 / 8.568 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 41 / 17.589 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 6.174 10 / 6.174 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - Installation Cost 23 / 7.153 0 / 0.000 23 / 7.153 0 / 0.000 23 / 7.153 4 / 1.400 21 / 8.568 15 / 5.280 41 / 17.589 21 / 8.568 - 41 / 17.589 23 / 7.153 / - 10 / 6.174 - / - 114 / 46.164 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - 7 8 8 - 1 1 1 1 5 5 5 - 8 8 5 - 11 10 10 10 10 114 Out - - - - - - - - - 7 8 8 - 1 1 1 1 5 5 5 - 8 8 5 - 11 10 10 10 10 114 Method of Implementation (Organic): Consolidated Prior Year Requirements LI 2657 - NAVSTAR GPS Receivers (Space) Navy Installation Quantity: 9 UNCLASSIFIED Page 13 of 14 P-1 Line #54 Volume 2 - 355 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2657 / NAVSTAR GPS Receivers (Space) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (1R019) Global Positioning System (GPS)-based Positioning, Navigation, & Timing Service (GPNTS) MDAP/MAIS Code: Footnotes: (5) GPNTS (Configuration B) - Ship: 1) GPNTS unit cost for each procured shipset is a Dual Redundant System consisting of two Racks and two GPS Receivers. GPNTS has awarded two (2) IDIQ type production contracts; procured units are competed between two (2) prime vendors per delivery order to promote continuous competitive pricing through the life of the contract. Delivery orders are executed annually, at a minimum. The quantities and dollars awarded to each prime vendor is unknown until contract award. (6) GPNTS (MSC): 1) Funding for Military Sealift Command (MSC) procurements and installations to correspond with concurrent MSC NAVWAR Advance Digital Antenna Production (ADAP) procurements and installations 2) Military Sealift Command (MSC) installation costs have risen significantly due to factors including: last minute finalization of Military Sealift Command (MSC) availability locations (30 days prior) which increase Fleet Installation Office estimates; alteration installation team expenses increase due to short time frame required for travel, per diem, and expedited shipping of government furnished equipment (GFE). Outside continental United States (OCONUS) work further contributes to overall expense increases. Finally, increased Government Installation Contract (GIC) costs, likely stemming from labor shortages and general inflationary pressures, are driving up the price of both parts and labor. 3) GPNTS on MSC ships is a Config A system consisting of one (1) rack and GPS receiver. (7) GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu): 1) Procurement unit and installation costs for the GPNTS Enhancements for M-GUE and NoGAPSS Upgrades (GPNTS eMNu) are the combined cost of both MGUE and NoGAPSS Upgrade Kits with procurement and installation quantities and cost driven by required kit configuration and ship availability periods. The average cost for GPNTS Enhancements for M-GUE upgrades is estimated to be approximately $25,500. The NoGAPSS Upgrades is estimated at approximately $500,000 per system. 2) Once a fully matured M-Code capable GPNTS design is placed into production, all further GPNTS shipset produced from that point in time will be M-Code capable, and the MGUE upgrade effort will be established to bring all previously fielded GPNTS systems up to the M-Code capable configuration. The upgrade process will consist of the removal of the existing SAASM-Based GPS receiver card, replacing with the M-Code capable version. The MGUE retrofit will include a Software (SW) Load and a full System Operability Verification Test (SOVT). No major platform work, additional cabling or Design Service Allocation (DSA) is required. 3) MGUE upgrades will only be performed on shipsets that already have NoGAPSS hardware from initial fielding or retrofitted with the NoGAPSS Upgrade Kit. Installation schedule planning is constrained by the limited suitable avails for those platforms. 4) The NoGAPSS upgrade effort will be performed on GPNTS shipset racks already installed on platforms by adding or replacing components (e.g. single Cesium clock and replacement of the Time and Frequency Component (TFC)) and will include a Software Load (SW) and a full System Operability Verification Test (SOVT). Design Service Allocation (DSA) is not required in near term; however, as Modular Open Systems Approach (MOSA) elements are inserted to improve resiliency and additional capability, complexity of installation and cost to procure is expected to increase. 5) All platforms in this plan have GPNTS shipsets procured before the finalization of Technical Data Package (TDP) updates that changed the GPNTS build design to include the NoGAPSS Hardware. Installation schedule planning is constrained by the limited suitable avails for those platforms. 6) GPNTS eMNu Production Lead Time for both the MGUE and NoGAPSS Kits is nine (9) months. (8) Consolidated Prior Year Requirements: Procurement Qty 9 GPNTS (Shore) $5.931M in FY 2018, Installation Qty 9 GPNTS (Shore) $2.025M in FY 2019, GPNTS (MSC) Engineering Change Proposal $0.953M ($0.653M in FY 2021 and $0.300 in FY 2022) (9) GPNTS DSA: 1) GPNTS pre-installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. (10) GPNTS MCS DSA: 1) GPNTS pre-installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. LI 2657 - NAVSTAR GPS Receivers (Space) Navy UNCLASSIFIED Page 14 of 14 P-1 Line #54 Volume 2 - 356 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 56.638 3.802 0.304 0.289 0.000 0.289 0.319 0.330 0.353 - - - - - - - - - 56.638 3.802 0.304 0.289 0.000 0.289 0.319 0.330 0.353 - - - - - - - - - 56.638 3.802 0.304 0.289 0.000 0.289 0.319 0.330 0.353 To FY 2031 Complete 0.362 Continuing - Continuing - 0.362 Continuing - Total - Continuing - - 0.362 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: American Forces Radio and Television Service (AFRTS) shipboard systems provide command information to deployed Sailors and Marines and allow for the distribution of AFRTS programming in order to provide situational awareness for forward deployed commanders with real-time news and information. The systems also provide programming to Sailors and Marines at sea worldwide as a Navy Quality of Life (QOL) initiative, staying in compliance with the Chief of Naval Operations (CNO) Shipboard Habitability Program. These systems contribute significantly to the habitability of Navy ships by providing and distributing news, command information, training, and entertainment programming using the latest technology available. These systems improve morale, combat effectiveness and retention rates of deployed personnel. All AFRTS systems use Commercial-Off-the-Shelf (COTS) equipment. Fleet Support Detachments (FSDs) are the installing agents for these systems. Each component replacement is made based on ship availability, condition of system, and is coordinated through the Type Commanders (TYCOMs). [P5 / Site CCTV - Digital/300]: Shipboard Information, Training and Entertainment (SITE) Closed Circuit Television (CCTV) Digital/300 is the next generation of the SITE 2000/300. This system is a digitally based replacement for the 2000/300 playback. Each system is comprised of Commercial Off-The-Shelf (COTS) components that take three to twelve months to procure. Each component upgrade/replacement is made based on ship availability, by the Fleet Support Detachments (FSDs) as the installing/replacement agents and condition of the system. [P5 / Site CCTV - Digital/400]: Digital/400 is the next generation of the SITE 2000/400. This system is a digitally based replacement for the 2000/400 playback. Requires manpower of one dedicated technician and operator. Each system is comprised of Commercial Off-The-Shelf (COTS) components that take three to twelve months to procure. Each component upgrade/replacement is made based on ship availability, by the Fleet Support Detachments (FSDs) as the installing/replacement agents and condition of the system. [P5 / Site CCTV - Digital/501]: Digitial/500 is the next generation of the Shipboard Information, Training and Entertainment (SITE) 2000/500. This system is a digitally based replacement for the 2000/500 playback. Requires manpower of two dedicated technicians and three operators. Each system is comprised of Commercial Off-The-Shelf (COTS) components that take three to twelve months to procure. Each component upgrade/replacement is made based on ship availability, by the Fleet Support Detachments (FSDs) as the installing/repair agents and condition of the system. [P5 / Shipboard Broadcast System (SBS)]: The SBS system replaces the Shipboard Information, Training and Entertainment (SITE) 300/400/501 systems with an Internet Protocol (IP) video system. It collects and converts video content from several sources: Navy Motion Picture Services (NMPS) programming via encrypted DVDs (nDVD), Video Server, and shipboard surveillance cameras; and distributes the signals via Circuit 30 in Standard or High Definition. Each system is comprised of Commercial Off-The-Shelf (COTS) equipment that takes six to twelve months to procure. Each system upgrade is done based on ship availability by the Fleet Support Detachments (FSDs) as the installing/replacing agent and condition of the system. LI 2666 - American Forces Radio and TV Service (AF... Navy UNCLASSIFIED Page 1 of 6 P-1 Line #55 Volume 2 - 357 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / K0830 - Production Engineering]: Supports review and approval of any production contract technical documentation or the separate development of this documentation to include: signal flow diagrams, Preventive Maintenance Services (PMS), production drawings, provisioning technical documentation (PTD), Integrated Logistic Support (ILS), Program Support Data (PSD), Allowance Parts List (APL's), and engineering in support of final design reviews. [P5 / K0INS - Non-FMP Installation]: Supports the installation of Shipboard Information, Training and Entertainment (SITE), TV-Direct to Sailor (TV-DTS) system onboard Navy ships. Installations are performed by Defense Media Activity Agency (DMAA) Fleet Support Detachments (FSDs) and are based on Type Commander (TYCOM) nominations. LI 2666 - American Forces Radio and TV Service (AF... Navy UNCLASSIFIED Page 2 of 6 P-1 Line #55 Volume 2 - 358 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 7: Other Ship Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / American Forces Radio and TV Service (AFRTS) P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 56.638 - / 3.802 - / 0.304 - / 0.289 - / 0.000 - / 0.289 - / 56.638 - / 3.802 - / 0.304 - / 0.289 - / 0.000 - / 0.289 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 2666 - American Forces Radio and TV Service (AF... Navy UNCLASSIFIED Page 3 of 6 P-1 Line #55 Volume 2 - 359 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / American Forces Radio and TV Service (AFRTS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 56.638 3.802 0.304 0.289 0.000 0.289 - - - - - - 56.638 3.802 0.304 0.289 0.000 0.289 - - - - - - 56.638 3.802 0.304 0.289 0.000 0.289 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 1.1.1) Site CCTV Digital/300 (†) 1.1.2) Site CCTV Digital/400 (†) 1.1.3) Site CCTV Digital/501 (†) 1.1.4) Shipboard Broadcast System (SBS) (†) Subtotal: Recurring Cost 54,396.55 58 3.155 4,000.00 255 1.020 - - - - - - - - - - - - 40,471.70 53 2.145 4,000.00 25 0.100 - - - - - - - - - - - - 34,758.62 29 1.008 10,000.00 6 0.060 0.046 - - - 303,000.00 8 2.424 303,000.00 1 0.303 - - - - - - - - - - - - 10,000.00 5 0.050 9,200.00 5 9,200.00 5 0.046 - - 8.732 - - 1.483 - - 0.050 - - 0.046 - - - - - 0.046 - - 8.732 - - 1.483 - - 0.050 - - 0.046 - - - - - 0.046 2.1) K0830 - Production Engineering - - 42.811 - - 2.100 - - 0.254 - - 0.243 - - - - - 0.243 2.2) K0INS - Non-FMP Installation - - 5.095 - - 0.219 - - - - - - - - - - - - Subtotal: Support Cost - - 47.906 - - 2.319 - - 0.254 - - 0.243 - - - - - 0.243 Gross/Weapon System Cost - - 56.638 - - 3.802 - - 0.304 - - 0.289 - - 0.000 - - 0.289 Subtotal: Hardware Cost Support Cost Remarks: LI 2666 - American Forces Radio and TV Service (AF... Navy UNCLASSIFIED Page 4 of 6 P-1 Line #55 Volume 2 - 360 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / American Forces Radio and TV Service (AFRTS) MDAP/MAIS Code: [Hardware] [Hardware/Recurring] (†) indicates the presence of a P-5a LI 2666 - American Forces Radio and TV Service (AF... Navy UNCLASSIFIED Page 5 of 6 P-1 Line #55 Volume 2 - 361 === page 442 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 7 FY Contractor and Location 1.1.1) Site CCTV - Digital/300 2024 Various / Various WR NIWC ATL Dec 2023 Jun 2024 5 10,000.00 Y 1.1.1) Site CCTV - Digital/300 2025 Various / Various WR NIWC ATL Dec 2024 Jun 2025 255 4,000.00 Y 1.1.2) Site CCTV - Digital/400 2024 Various / Various WR NIWC ATL Dec 2023 Jun 2024 5 10,000.00 Y 1.1.2) Site CCTV - Digital/400 2025 Various / Various WR NIWC ATL Dec 2024 Jun 2025 25 4,000.00 Y 1.1.3) Site CCTV - Digital/501 2024 Various / Various WR NIWC ATL Dec 2023 Jun 2024 6 10,000.00 Y 1.1.3) Site CCTV - Digital/501 2025 Various / Various WR NIWC ATL Dec 2024 Jun 2025 6 10,000.00 Y 1.1.3) Site CCTV - Digital/501 2026 Various / Various WR NIWC ATL Dec 2025 Jun 2026 5 10,000.00 Y 1.1.3) Site CCTV - Digital/501 2027 Various / Various WR NIWC ATL Dec 2026 Jun 2027 5 9,200.00 Y 1.1.4) Shipboard Broadcast System (SBS) 2024 VARIOUS / VARIOUS WR NIWC ATL Dec 2023 Jun 2024 1 302,666.00 Y 1.1.4) Shipboard Broadcast System (SBS) 2025 VARIOUS / VARIOUS WR NIWC ATL Dec 2024 Jun 2025 1 303,000.00 Y LI 2666 - American Forces Radio and TV Service (AF... Navy Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 1 / American Forces Radio and TV Service (AFRTS) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2666 / American Forces Radio and TV Service (AFRTS) UNCLASSIFIED Page 6 of 6 P-1 Line #55 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 2 - 362 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 659.129 659.129 659.129 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 90.586 97.262 83.057 0.000 83.057 92.016 - - - - - - 90.586 97.262 83.057 0.000 83.057 92.016 - - - - - - 90.586 97.262 83.057 0.000 83.057 92.016 100.080 100.080 100.080 102.019 102.019 102.019 To FY 2031 Complete 101.572 Continuing 101.572 Total - Continuing Continuing - Continuing - - Continuing Continuing 3.852 Continuing Continuing 101.572 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.649 - 5.445 - 5.445 5.119 3.726 2.571 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: MATCALS Marine Air Traffic Control and Landing Systems (MATCALS) provides for continuous, all-weather, radar/non-radar approach, departure, en-route, and tower air traffic control services to an aircraft. Marine Air Traffic Control (ATC) provides initial, transition and sustained air traffic support for the Joint and Marine Air Ground Task Force air operations in any environment. MATCALS satisfies the operational requirements set forth by Specific Operational Requirements 34-22 of 12 Jul 1973; and Air Traffic Navigation Integration and Coordination System ORD 05-002 of 03 Dec 1992. MATCALS, with other Marine Air Command and Control Systems (MACCS) and federal agencies, provides the ability to project air combat power without regard to weather. ATC automation reduces air traffic controllers' traffic handling and management time, allowing more time for mission response and task accomplishment. It supports a required increase in aircraft sortie rates and contributes to extended time on target. The system provides for integration of ATC into the total MACCS. To provide this capability, MATCALS consists of 4 primary subsystems: (1) Air Traffic Navigation integration and Coordination system (ATNAVICS) AN/TPN-31(V); (2) Expeditionary Control Tower AN/TSQ-120D; (3) the Man-Portable TACAN AN/TRN-47(V)1 & 3; (4) Transportable TACAN AN/TRN-47(V)2 & 4; and various ancillary equipment. This program works with the Marine ATC Working Group identifying the requirements to implement the Pre-Planned Product Improvement (P3I) and evolutionary product improvements as required for the Ground/Air Task-Oriented Radar (G/ATOR) system, Common Aviation Command and Control System (CAC2S), ATNAVICS, Expeditionary ATC Towers, and Navigational Aids that support Marine Air Traffic Control Companies. G/ATOR is a multi-role, ground-based, expeditionary radar that replaces five legacy radar systems for the Marine Air Ground Task Force. It satisfies the Marine Air Command and Control System (MACCS) and the Ground Counter Fire / Counter Battery capabilities. Integration of ATNAVICS with the CAC2S provides a coordinated and integrated set of equipment to provide enhanced Command and Control (AC2) capability for the Tactical Air Command Center, Tactical Air Operations Center, and Direct Air Support Center to support aviation employment in Joint, combined, and coalition operations. Increased MATCALS component obsolescence of aging systems is resulting in additional Maintainability, Reliability, Improvement (MRI) costs to support the changing operational environment of the MACCS as defined by USMC Force Design 2030 dated March 2020. Evolution of MATCALS to align with the overall USN/USMC North Star Precision Approach Landing Capability (PALC) to provide landing capability in both contested and non-contested environments via non-radar and radar based systems. NASMOD The Joint DoW/Federal Aviation Administration (FAA) National Airspace System (NAS) Modernization (MOD) program upgrades the DoW ATC systems at approach control facilities in concert with the FAA's upgrade of the National ATC System. These funds will procure ATC systems for the Navy/Marine ATC facilities. The Air Force is the DoW lead activity for the Joint Acquisition Program. The Joint Program Office is located at Hanscom AFB, MA. FLEET ATC SYSTEMS LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 1 of 81 P-1 Line #56 Volume 2 - 363 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A NAVAIR provides shore based ATC terminal facilities with equipment that is required in joint efforts to efficiently and safely monitor and direct military and commercial air traffic in national and international air space. Many of these systems are required to interface through automated means with the FAA. Additionally, NAVAIR has material support responsibility for Special Instrumentation Systems, and Ancillary Equipment used at Navy and Marine Corps Aviation Shore activities in the continental United States and overseas. Engineering Change Proposal (ECP)/Operational Capability Improvement Request (OCIR) modernization (MR069) - The ECP/OCIR program provides for the procurement and/or modification of critically needed communications, radar, displays, data processors, and other electronic systems/equipment at Navy/Marine Corps ATC facilities worldwide. ECP/OCIR procurements replace and modernize costly-to-maintain systems and equipment in order to increase ATC efficiency and safety, and reduce total ownership costs. UHF/VHF Antenna Upgrade (MR404) - This program procures and installs antenna, antenna towers, and antenna cables. Communications Systems Upgrade Program (MR408) - This program procures and installs advanced commercial state-of-the-art ATC voice switching equipment and was completed in FY 2019. Future upgrades and replacement systems will be performed under the NASMOD NAS Voice System budget line. UHF/VHF Transceiver Replacement Program (MR440) - This program modernizes aging Navy and Marine Corps UHF/VHF Transceivers that are the central core of all ATC emergency and Fleet Area Control & Surveillance Facility (FACSFAC) communications and was completed in FY 2019. Future upgrades and replacement systems will be performed under the NASMOD NAS Voice System budget line. Emergency Communication System (ECS) Upgrade Program (MR445) - This program modernizes obsolete and unsupportable ECS equipment. Voice Switches, Recorders, Reproducers, Uninterruptable Power Supplies, and Built-In Test Equipment will be replaced with modern, supportable components and procurements were completed in FY 2020 and installations completed in FY 2022. Future upgrades and replacement systems will be performed under the NASMOD NAS Voice System budget line. Air Field Lighting Control System (AFLCS) (MR510) - This program modernizes obsolete and unsupportable AFLCS equipment which will be replaced with modern, supportable components. Funding for this effort was realigned to the Terminal Automation System (TAS) CB070 beginning in FY 2018. The TAS provides the functionality and meets the requirements of the airfield lighting control as prescribed in the NASMOD ORD III Airfield Automation Annex A dated 16MAR05. The AFLCS circuitry will be incorporated into the Visual Information Display System (VIDS) as part of the VIDS Tech Refresh Program under the NASMOD budget line. Operational Communication System (OCS)/Emergency Communication System (ECS) Air Traffic Control (ATC) Recorder replacement program (MR520) - Through participation in the FAA ATC recorder replacement program will replace aging and obsolete ATC OCS and ECS ATC recorders with state of the art ATC recording/reproducing technology. Fiber Optic Communications Intersite System (FOCIS) Upgrade Program (MR530) - FOCIS is required for Precision Approach Radar (PAR) operations and for ATC voice communications at Naval and Marine Corps ATC facilities. This program modernizes obsolete and unsupportable FOCIS equipment with modern supportable components. LANDING SYSTEMS Landing Systems budget provides funding to modernize and ensure the reliability of Precision Approach Radars (PAR), Tactical Air Navigation (TACAN) systems, Instrument Landing Systems (ILS), and other air navigation aids used by the Navy and Marine Corps. The PAR Commercial-off-the-shelf (AN/FPN-68A) - Upgrade replaces obsolete PAR systems (AN/FPN-63), continuing fleet shore-based Precision Approach capability. PAR (AN/FPN-63) safety-related ECPs are required to sustain the existing systems until replacement with the AN/FPN-68A. Installation costs will be site specific due to state and Environmental Protection Agency (EPA) regulations that will be adhered to for each install. Those ECPs include, but are not limited to, the Maintenance Walkway, the Modulator Board Upgrade, the Antenna Upgrade, the Configuration Upgrade, the Turntable Upgrade, the Fiber Optic Inter-site System (FOIS), and the Angle Voltage Generator (AVG) Upgrade. Instrument Landing Systems (AN/GRN-33(V)) will provide the Navy and Marine Corps with a self-contained Precision Landing capability at selected Air Stations, to meet fleet requirements for safe aircraft recovery of aircraft equipped with ILS capability. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 2 of 81 P-1 Line #56 Volume 2 - 364 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TACAN Ship/Shore Upgrade ECPs update old technology and extend the service life of the TACAN. The TACAN sustainment consists of the Antenna Upgrade ECP for the OE-273 antenna which will make the antenna OE-4691(V)1 and the Beacon/RSCU Upgrade ECP of the AN/URN-25 which will make the upgraded Beacon an AN/URN-32 and the Shore Antenna Replacement for the OE-258A, nomenclature TBD. Multiple Engineering Change Proposal (ECP) will address obsolescence with the system. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 3 of 81 P-1 Line #56 Volume 2 - 365 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / MATCALS - / 28.816 - / 4.080 - / 4.108 - / 3.149 - / 0.000 - / 3.149 P-5 2 / Fleet Air Traffic Control Systems - / 72.238 - / 11.301 - / 11.486 - / 10.464 - / 0.000 - / 10.464 P-5 3 / Landing Systems - / 44.574 - / 8.148 - / 5.230 - / 4.273 - / 0.000 - / 4.273 P-3a 1 / MJ447 ATNAVICS Precision Approach Radar Replacement (Modernization) - / 10.164 - / 0.500 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / MJ667 Expeditionary TACAN Obsolescence (Modernization) - / 6.580 - / 3.023 - / 4.867 - / 4.147 - / 0.000 - / 4.147 P-3a 3 / MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) (Modernization) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 4 / MJ475 MATCALS TPX-57 (Modernization) (Modernization) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 5 / MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh (Modernization) - / 0.000 - / 6.518 - / 4.531 - / 3.689 - / 0.000 - / 3.689 P-3a 6 / CB010 - DoW Advanced Automation System (DAAS) (Added Capability) - / 14.455 - / 0.440 - / 0.448 - / 0.456 - / 0.000 - / 0.456 P-3a 7 / CB030 Digital Airport Surveillance Radar (DASR) (Added Capability) - / 4.134 - / 0.666 - / 0.680 - / 0.692 - / 0.000 - / 0.692 P-3a 8 / CB040 Tower Automation System (TAS) (Added Capability) - / 5.533 - / 0.339 - / 0.345 - / 0.352 - / 0.000 - / 0.352 P-3a 9 / CB080 NAS Voice System (NVS) (TBD) - / 64.588 - / 12.886 - / 18.865 - / 11.529 - / 0.000 - / 11.529 P-3a 10 / CB090 - DAAS Tech Refresh Upgrade II (Added Capability) - / 13.680 - / 9.343 - / 14.158 - / 12.448 - / 0.000 - / 12.448 P-3a 11 / CB100 TAS Tech Refresh Upgrade II (Added Capability) - / 53.873 - / 4.657 - / 0.580 - / 0.000 - / 0.000 - / 0.000 P-3a 12 / CB110 DASR Tech Refresh Upgrade III (Added Capability) - / 12.960 - / 6.958 - / 4.152 - / 0.567 - / 0.000 - / 0.567 P-3a 13 / CB120 TAS Tech Refresh Upgrade III (Added Capability) - / 0.000 - / 0.000 - / 10.265 - / 6.660 - / 0.000 - / 6.660 P-3a 14 / CB130 DASR Tech Refresh Upgrade IV (Added Capability) - / 0.000 - / 0.000 - / 6.225 - / 6.639 - / 0.000 - / 6.639 P-3a 15 / CB140 ATC Surveillance (TBD) - / 0.000 - / 0.000 - / 0.000 - / 6.947 - / 0.000 - / 6.947 P-3a 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH (Reliability) - / 103.753 - / 6.049 - / 1.561 - / 2.006 - / 0.000 - / 2.006 P-3a 17 / X1037 Instrument Landing System Upgrade (TBD) - / 43.922 - / 4.308 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 18 / X1044 Landing Systems Tech Refresh (TBD) - / 0.709 - / 0.717 - / 0.733 - / 0.748 - / 0.000 - / 0.748 P-3a 19 / X1043 TACAN Antenna Upgrade (Modernization) - / 85.049 - / 10.653 - / 9.028 - / 8.291 - / 0.000 - / 8.291 P-3a 20 / INACTIVE PROJECTS (TBD) - / 94.101 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 659.129 - / 90.586 - / 97.262 - / 83.057 - / 0.000 - / 83.057 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / MATCALS - / - - / - - / - - / - - / - - / - P-5 2 / Fleet Air Traffic Control Systems - / - - / - - / - - / - - / - - / - P-5 3 / Landing Systems - / - - / - - / - - / - - / - - / - LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 4 of 81 P-1 Line #56 Volume 2 - 366 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / MJ447 ATNAVICS Precision Approach Radar Replacement (Modernization) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 10.664 P-3a 2 / MJ667 Expeditionary TACAN Obsolescence (Modernization) - / 3.772 - / 4.023 - / 1.739 - / 0.170 - / 0.000 - / 28.321 P-3a 3 / MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) (Modernization) - / 0.000 - / 0.000 - / 3.443 - / 6.520 - / 25.273 - / 35.236 P-3a 4 / MJ475 MATCALS TPX-57 (Modernization) (Modernization) - / 4.586 - / 2.821 - / 3.581 - / 1.446 - / 0.000 - / 12.434 P-3a 5 / MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh (Modernization) - / 2.252 - / 0.841 - / 0.000 - / 0.000 P-3a 6 / CB010 - DoW Advanced Automation System (DAAS) (Added Capability) - / 0.464 - / 0.473 - / 0.482 - / 0.492 P-3a 7 / CB030 Digital Airport Surveillance Radar (DASR) (Added Capability) - / 0.704 - / 1.096 - / 1.118 - / 1.140 P-3a 8 / CB040 Tower Automation System (TAS) (Added Capability) - / 0.370 - / 0.377 - / 0.385 - / 0.393 P-3a 9 / CB080 NAS Voice System (NVS) (TBD) - / 13.861 - / 17.822 - / 17.860 - P-3a 10 / CB090 - DAAS Tech Refresh Upgrade II (Added Capability) - / 14.734 - / 11.117 - / 9.815 P-3a 11 / CB100 TAS Tech Refresh Upgrade II (Added Capability) - / 0.000 - / 0.000 - P-3a 12 / CB110 DASR Tech Refresh Upgrade III (Added Capability) - / 0.000 - / 0.000 P-3a 13 / CB120 TAS Tech Refresh Upgrade III (Added Capability) - / 6.291 - / 6.356 P-3a 14 / CB130 DASR Tech Refresh Upgrade IV (Added Capability) - / 4.573 - / 5.901 - / 6.945 P-3a 15 / CB140 ATC Surveillance (TBD) - / 3.836 - / 13.718 - / 13.254 P-3a 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH (Reliability) - / 6.365 - / 4.736 - / 5.844 P-3a 17 / X1037 Instrument Landing System Upgrade (TBD) - / 0.000 - / 0.000 - P-3a 18 / X1044 Landing Systems Tech Refresh (TBD) - / 0.763 - / 0.778 - P-3a 19 / X1043 TACAN Antenna Upgrade (Modernization) - / 11.286 - / 11.130 P-3a 20 / INACTIVE PROJECTS (TBD) - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 92.016 - / 100.080 Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing / 20.311 Continuing Continuing - / 6.251 Continuing Continuing / 0.000 - / 0.000 - / 0.000 - / 59.110 - / 0.000 - / 0.000 - / 0.000 - / 24.637 - / 5.918 - / 6.057 Continuing Continuing - / 7.362 Continuing Continuing - / 11.601 - - / 6.374 Continuing / 0.000 - / 0.000 - / 0.795 - / 0.811 Continuing Continuing - / 11.768 - / 12.164 Continuing Continuing - / 0.000 - / 0.000 - / 101.572 Continuing - / 102.019 - / 24.382 / 0.000 / 0.000 - / 73.738 Continuing - - / 48.230 / 94.101 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Budget Request includes funding for the following ($83.057M): MATCALS ($10.985M) FY 2027 provides funding to procure Maintainability/Reliability Improvements (MRI) for deployable Air Traffic Equipment, which supports safe and orderly Marine, Joint, and Coalition aviation control in permissive areas and non-permissive combat zones into and out of expeditionary airfields, forward operating bases, and forward arming / refueling points. FY 2027 funding will procure 3 ATNAVICS Tech Refreshes, 8 Expeditionary AN/TRN-47(V)4 TACAN kits and various MRI efforts. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 5 of 81 P-1 Line #56 Volume 2 - 367 === page 448 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A NASMOD ($46.290M) The Federal Aviation Administration (FAA) began the Next Generation Air Transportation System initiative in FY 2008. A major component of this capability is Automatic Dependent Surveillance Broadcast, which will provide aircraft position information to augment ground-based radar. Existing DoW Air Traffic Control (ATC) facilities interface with FAA's facilities, therefore the military must maintain interoperability and retain vital special-use airspace for combat readiness training. The DoW Advanced Automation System (DAAS) must be upgraded to meet this requirement. FY 2027 provides funding to procure 25 NAS Voice Switch Tech Refreshes, 5 DAAS Tech Refresh II Upgrades, 3 TAS Tech Refresh III Upgrades, 2 DASR Tech Refresh IV Upgrades, 6 ATC Surveillance systems and various Engineering Change Proposals (ECPs) and associated Support. FLEET ATC SYSTEMS ($10.464M) The basis for the FY 2027 budget request is to continue modernizing aging Navy and Marine Corps ATC facilities and equipment in order to safely monitor and direct military and commercial air traffic in national and international air space. This equipment must continue to interface through automated means with the FAA. FY 2027 provides funding to procure 1 UHF/VHF Antenna Upgrades, 13 OCS/ECS ATC Recorder upgrades, 5 FOCIS Upgrades, 10 FDIO Upgrades, 4 Emergency Power Upgrades, and various ECPs/OCIRs and associated support. LANDING SYSTEMS ($15.318M) FY 2027 provides funding to procure: 12 TACAN Antenna Upgrades, 12 TACAN Beacon/Series 2 upgrades and various Landing System Tech Refreshes. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 6 of 81 P-1 Line #56 Volume 2 - 368 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MATCALS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 28.816 4.080 4.108 3.149 0.000 3.149 - - - - - - 28.816 4.080 4.108 3.149 0.000 3.149 - - - - - - 28.816 4.080 4.108 3.149 0.000 3.149 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - ECP / ECO Cost Recurring Cost 1.1.1) MAINT / RELIABILITY IMPROVEMENT - - 22.344 - - 3.155 - - 3.074 - - 2.363 - - 0.000 - - 2.363 Subtotal: Recurring Cost - - 22.344 - - 3.155 - - 3.074 - - 2.363 - - 0.000 - - 2.363 Subtotal: Hardware - ECP / ECO Cost - - 22.344 - - 3.155 - - 3.074 - - 2.363 - - 0.000 - - 2.363 (MJ427) (1) Support - MISCELLANEOUS Support Cost 2.1) Install (MJ900) - - 6.472 - - 0.925 - - 1.034 - - 0.786 - - 0.000 - - 0.786 Subtotal: Support MISCELLANEOUS Support Cost - - 6.472 - - 0.925 - - 1.034 - - 0.786 - - 0.000 - - 0.786 Gross/Weapon System Cost - - 28.816 - - 4.080 - - 4.108 - - 3.149 - - 0.000 - - 3.149 Footnotes: (1) FY 2027 funding is required for obsolescence and evolutionary changes to support the USMC Force Design 2030 effort. The 2018 National Defense Strategy redirected the Marine Corps' mission focus resulting in the USMC Force Design 2030 sweeping effort. To meet the Force 2030 guidance and overcome rapidly evolving threats, Marine Air Traffic Control and Landing Systems (MATCALS) needs to transform through modest and incremental improvements. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 7 of 81 P-1 Line #56 Volume 2 - 369 === page 450 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Fleet Air Traffic Control Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 72.238 11.301 11.486 10.464 0.000 10.464 - - - - - - 72.238 11.301 11.486 10.464 0.000 10.464 - - - - - - 72.238 11.301 11.486 10.464 0.000 10.464 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Fleet ATC - Hardware Cost Recurring Cost 1.1.1) MR069 ECP/ 177,103.45 29 5.136 59,000.00 12 0.708 91,777.78 9 0.826 82,000.00 3 0.246 - - 0.000 82,000.00 3 0.246 1.1.2) MR404 UHF/ VHF Antenna Upgrade 900,000.00 12 10.800 1,100K 2 2.200 1,125K 2 2.250 1,148K 1 1.148 - - 0.000 1,148K 1 1.148 1.1.3) MR520 OCS/ ECS ATC Recorder 92,307.69 65 6.000 103,571.43 14 1.450 105,333.33 12 1.264 116,000.00 13 1.508 - - 0.000 116,000.00 13 1.508 111,181.82 22 2.446 117,000.00 5 0.585 120,000.00 5 0.600 122,300.00 5 0.612 - - 0.000 122,300.00 5 0.612 - - 0.000 - - 0.000 - - 0.000 30,300.00 10 0.303 - - 0.000 30,300.00 10 0.303 - - 0.000 - - 0.000 - - 0.000 40,000.00 4 0.160 - - 0.000 40,000.00 4 0.160 Subtotal: Recurring Cost - - 24.382 - - 4.943 - - 4.940 - - 3.977 - - 0.000 - - 3.977 Subtotal: Hardware - Fleet ATC - Hardware Cost - - 24.382 - - 4.943 - - 4.940 - - 3.977 - - 0.000 - - 3.977 - - 2.099 - - 0.320 - - 0.352 - - 0.325 - - 0.000 - - 0.325 OCIR (2) (3) Upgrade (4) 1.1.4) MR530 FOCIS Upgrade (5) 1.1.5) FDIO Upgrade (6) 1.1.6) Emergency Power Upgrade (7) Support - Other Cost 2.1) Fleet ATC Integrated Logistics Support (MR800) LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 8 of 81 P-1 Line #56 Volume 2 - 370 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Fleet Air Traffic Control Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 2.2) Fleet ATC Production Engineering (MR830) 2.3) Fleet ATC Installs 2.4) Inactive Projects (8) Qty (Each) 123,210.00 FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - 6.750 - - 1.124 - - 1.355 - - 1.294 - - 0.000 - - 1.294 - 26.686 - - 4.914 - - 4.839 - - 4.868 - - 0.000 - - 4.868 100 12.321 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Other Cost - - 47.856 - - 6.358 - - 6.546 - - 6.487 - - 0.000 - - 6.487 Gross/Weapon System Cost - - 72.238 - - 11.301 - - 11.486 - - 10.464 - - 0.000 - - 10.464 Footnotes: (2) MR069: This program provides for the procurement and/or modification of critically needed communications, radar, displays, data processors and other electronic systems / equipment at Navy / Marine Corps Air Traffic Control facilities worldwide. Due to the variety of the Air Traffic Control systems involved and the scope of these validated requirements, costs can vary significantly between fiscal years. The unit cost for an individual OCIR can range from $1,500 to $500,000 so the unit cost is an average of all OCIRs procured in that year and as such will fluctuate from year to year. (3) MR404: UHF/VHF Antenna Upgrade - UHF/VHF antennas enable ground to air communications between air traffic controllers and aircraft pilots. New antenna and antenna cables are required to replace existing aged and deteriorated antennas and cables. For dependable ground to air communications, replacement of the antennas and cables is imperative. Inventory objective is 60. (4) MR520: The Operational Communication System (OCS) and Emergency Communication System (ECS) Air Traffic Control (ATC) recorder upgrade through participation in the Federal Aviation Administration (FAA) ATC recorder replacement program will replace aging and obsolete ATC OCS and ECS ATC recorders with state of the art ATC recording/reproducing technology. (5) MR530: Fiber Optic Communications Intersite System (FOCIS) Upgrade Program- This program modernizes obsolete and unsupportable FOCIS equipment with modern supportable components. Inventory objective is 44. (6) FDIO Upgrade - The FA-10095 Flight Data Input Output (FDIO) System was designed by the FAA for use in the National Airspace System (NAS). The FAA is conducting a Tech Refresh of the FDIO. We will procure the Tech Refresh hardware via the FAA contract. Inventory Objective is 41. (7) (8) Inventory objective is 45. This program will modernize the obsolete and unsupportable Emergency Power equipment with modern supportable components. Inactive projects prior year totals. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 9 of 81 P-1 Line #56 Volume 2 - 371 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Landing Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 44.574 8.148 5.230 4.273 0.000 4.273 - - - - - - 44.574 8.148 5.230 4.273 0.000 4.273 - - - - - - 44.574 8.148 5.230 4.273 0.000 4.273 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Landing Systems - TACAN Beacon Cost Recurring Cost 1.1.1) X1042 - TACAN BEACON UPGRADE (9) 216,144.93 138 29.828 221,458.33 24 5.315 225,887.00 12 2.711 231,583.33 12 2.779 - - 0.000 231,583.33 12 2.779 Subtotal: Recurring Cost - - 29.828 - - 5.315 - - 2.711 - - 2.779 - - 0.000 - - 2.779 Subtotal: Hardware Landing Systems - TACAN Beacon Cost - - 29.828 - - 5.315 - - 2.711 - - 2.779 - - 0.000 - - 2.779 2.1) X1800 - Landing Systems Integrated Logistics Support - - 0.277 - - 0.043 - - 0.044 - - 0.045 - - 0.000 - - 0.045 2.2) X1830 - Landing Systems Production Engineering - - 3.471 - - 0.612 - - 0.318 - - 0.326 - - 0.000 - - 0.326 2.3) X1840 - Landing Systems Quality Assurance - - 0.236 - - 0.043 - - 0.044 - - 0.045 - - 0.000 - - 0.045 2.4) X1900 - Landing System Installs - - 10.762 - - 2.135 - - 2.113 - - 1.078 - - 0.000 - - 1.078 Subtotal: Support - Other Cost - - 14.746 - - 2.833 - - 2.519 - - 1.494 - - 0.000 - - 1.494 Gross/Weapon System Cost - - 44.574 - - 8.148 - - 5.230 - - 4.273 - - 0.000 - - 4.273 Support - Other Cost LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 10 of 81 P-1 Line #56 Volume 2 - 372 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / Landing Systems MDAP/MAIS Code: Footnotes: (9) X1042: Inventory objective is 234. Beginning in FY 2026 the TACAN Beacon will be referred to as the Series 2 upgrade and will consist of 4 HPAs, 1 LPA, and 1 RMMC. This update will continue to reduce the overall cost of the TACAN system by gaining economies of scale savings and also reducing program installation costs by allowing all TACAN systems to be installed simultaneously. Additionally, the combined installation meets fleet demands, allowing greater operational readiness. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 11 of 81 P-1 Line #56 Volume 2 - 373 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / MJ447 ATNAVICS Precision Approach Radar Replacement MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 10.164 0.500 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.664 Total - - - - - - - - - - - - 10.164 0.500 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.664 - - - - - - - - - - - - 10.164 0.500 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.664 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Air Traffic Navigation Integration and Coordination System (ATNAVICS) current Program Approach Radar (PAR) system is plagued with obsolescence issues and increasing sustainment costs. This system will alleviate the obsolescence issues, reduce sustainment costs and satisfy the requirement to provide for a multiple runway PAR coverage as stated in the Marine Corps Operational and Organizational (O&O) Concept for the Air Traffic Navigation Integration and Coordination System (ATNAVICS), change 1 dated 8 Sep 05 PAR. The current ATNAVICS PAR has significant ongoing obsolescence issues and does not meet the requirement of a multiple touchdown capable system. This effort will capitalize on emerging technology and provides a small form factor precision recovery system that supports the Marine Corps' Expeditionary Advanced Base Operations Concept. This system will need to meet all current requirements and will be a one for one replacement. Letter of Direction from the Deputy Commandant for Aviation, Headquarters Marine Corps Aviation Department, dated 21 Dec 2022 directs PAR funding be diverted to AN/TRN-47 Tactical Air Navigation (TACAN) to resolve obsolescence issues and other MATCALS initiatives. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 12 of 81 P-1 Line #56 Volume 2 - 374 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TBD Modification Type: Modernization Prior Years Financial Plan Modification Number / Title: 1 / MJ447 ATNAVICS Precision Approach Radar Replacement FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: MJ447 ATNAVICS Precision Approach Radar Replacement B Kits Non-Recurring 1.1.1) Equipment - Non Organic - NonOrganic 7 / 4.031 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 4.031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 4.031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.1) Integrated Logistics Support - / 0.722 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 2.2) Production Engineering - / 4.186 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 4.908 Modification Item 1 of 1: MJ447 ATNAVICS Precision Approach Radar Replacement - / 1.225 - / 0.500 Subtotal: Installation - / 1.225 - / 0.500 Subtotal: Non-Recurring - Subtotal: MJ447 ATNAVICS Precision Approach Radar Replacement Subtotal: Procurement, All Modification Items - / / 0.000 - 7 / 4.031 - / - / 4.031 7 / 4.031 / 0.000 - / 4.031 - / - - / 0.722 - / - - / 4.186 - Support (All Modification Items) Subtotal: Support - / - - / - - / - / - - - / - - / - - / - - / - - / - - / 0.000 - / 4.908 / 0.000 - / 0.000 - / 1.725 / - - / 0.000 - / 1.725 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 10.164 0.500 0.000 0.000 0.000 UNCLASSIFIED Page 13 of 81 0.000 0.000 0.000 P-1 Line #56 0.000 0.000 0.000 10.664 Volume 2 - 375 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / MJ447 ATNAVICS Precision Approach Radar Replacement MDAP/MAIS Code: Modification Item 1 of 1: MJ447 ATNAVICS Precision Approach Radar Replacement Manufacturer Information Manufacturer Name: RAYTHEON Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment - Non Organic Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 1.225 2 / 0.500 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 1.725 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 5 / 1.225 2 / 0.500 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 7 / 1.725 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Out 5 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 14 of 81 P-1 Line #56 Volume 2 - 376 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / MJ667 Expeditionary TACAN Obsolescence MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 6.580 3.023 4.867 4.147 0.000 4.147 3.772 4.023 1.739 0.170 0.000 28.321 Total - - - - - - - - - - - - 6.580 3.023 4.867 4.147 0.000 4.147 3.772 4.023 1.739 0.170 0.000 28.321 - - - - - - - - - - - - 6.580 3.023 4.867 4.147 0.000 4.147 3.772 4.023 1.739 0.170 0.000 28.321 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Funding will replace obsolete Marine Corps Expeditionary Tactical Air Navigation (TACAN - AN/TRN-47 (V)1 & AN/TRN-47 (V)2) and provides FAA flight certifiable NAVAID for the safe recovery of aircraft during periods of reduced visibility in all theaters. This budget provides funding for the procurement, integration, and testing for obsolete components and delivery of modernized TACAN systems, all AN/TRN-47 variants, to the fleet Marine Corps. The manufacturer is no longer producing the AN/TRN-47 and repair support for fielded systems is limited to availability of component parts, and/or cannibalization of Marine Corps owned assets. System components are becoming obsolete. This Engineering Change Proposal line is required to maintain Marine Corps navigational guidance capabilities. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 15 of 81 P-1 Line #56 Volume 2 - 377 === page 458 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Expeditionary TACAN Prior Years Financial Plan Modification Number / Title: 2 / MJ667 Expeditionary TACAN Obsolescence Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: MJ667 Expeditionary TACAN Obsolescence B Kits Recurring 1.1.1) Expeditionary TACAN - NonOrganic Subtotal: Recurring Subtotal: MJ667 Expeditionary TACAN Obsolescence Subtotal: Procurement, All Modification Items 16 / 5.651 - / 5.651 1 / 1.368 - 16 / 5.651 / 1.368 1 / 1.368 10 / 3.352 - / 3.352 - 10 / 3.352 8 / 2.682 - / - / 2.682 - / - 8 / 2.682 - / - 8 / 2.682 - / 2.682 6 / 2.119 - 8 / 2.682 / 2.119 7 / 2.472 - 6 / 2.119 / 2.472 4 / 1.440 - / - / 1.440 - / - 4 / 1.440 - / - / 1.440 - / - - 7 / 2.472 - / / 0.000 - / - / 19.084 52 / 19.084 - / 5.651 - / 1.368 - / 3.352 - / 2.682 - / - - / 2.682 - / 2.119 - / 2.472 2.1) Integrated Logistics Support - / 0.233 - / 0.294 - / 0.300 - / 0.300 - / - - / 0.300 - / 0.312 - / 0.294 - / - - / - - / - - / 1.733 2.2) Production Engineering - / 0.696 - / 1.000 - / 1.000 - / 0.738 - / - - / 0.738 - / 1.000 - / 1.000 - / - - / - - / - - / 5.434 - / 0.929 - / 1.294 - / 1.300 - / 1.038 - / - - / 1.038 - / 1.312 - / 1.294 - / - - / - - / 0.000 - / 7.167 Modification Item 1 of 1: MJ667 Expeditionary TACAN Obsolescence - / 0.000 - / 0.361 - / 0.215 - / 0.427 / 0.000 - / 0.427 - / 0.341 - / 0.257 - / 0.299 - / 0.170 - / 0.000 - / 2.070 Subtotal: Installation - / 0.000 - / 0.361 - / 0.215 - / 0.427 / - - / 0.427 - / 0.341 - / 0.257 - / 0.299 - / 0.170 - / 0.000 - / 2.070 - / 0.000 52 / 19.084 - - / 19.084 - Support (All Modification Items) Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 6.580 3.023 4.867 4.147 0.000 UNCLASSIFIED Page 16 of 81 4.147 3.772 4.023 P-1 Line #56 1.739 0.170 0.000 28.321 Volume 2 - 378 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / MJ667 Expeditionary TACAN Obsolescence MDAP/MAIS Code: Modification Item 1 of 1: MJ667 Expeditionary TACAN Obsolescence Manufacturer Information Manufacturer Name: THALES Manufacturer Location: Salt Lake City, UT Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 13 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: AIT:: Installation Name: Expeditionary TACAN Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 0.361 16 / 0.533 Prior Years - / - 6 / 0.172 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - 1 / 0.043 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.043 FY 2026 - / - - / - - / - 10 / 0.427 - / - - / - - / - - / - 0 / 0.000 10 / 0.427 FY 2027 - / - - / - - / - - / - - / - - / - 8 / 0.341 - / - - / - - / - 0 / 0.000 8 / 0.341 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 0.257 - / - - / - 0 / 0.000 6 / 0.257 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.299 - / - 0 / 0.000 7 / 0.299 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.170 0 / 0.000 4 / 0.170 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 10 / 0.361 10 / 0.427 7 / 0.215 0 / 0.000 10 / 0.427 0 / 0.000 10 / 0.427 8 / 0.341 6 / 0.257 7 / 0.299 4 / 0.170 0 / 0.000 52 / 2.070 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 4 3 3 4 3 - - - 3 3 4 - 3 3 2 - 3 3 - - 3 3 1 - 1 1 2 - 52 Out - - 4 3 3 4 3 - - - 3 3 4 - 3 3 2 - 3 3 - - 3 3 1 - 1 1 2 - 52 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 17 of 81 P-1 Line #56 Volume 2 - 379 === page 460 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.443 6.520 25.273 35.236 Total - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.443 6.520 25.273 35.236 - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.443 6.520 25.273 35.236 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides Expeditionary Precision Approach Landing Capability (EPALC) - Radar for T/M/S not equipped to utilize Non-Radar solution in adverse weather in non-contested environments. Currently the ATNAVICS (HMMWV) performs as a self-contained, tactical Airport Surveillance Radar (ASR) and Precision Approach Radar (PAR) system that provides Air Traffic Control (ATC) services at designated airfields and landing sites. Due to Obsolescence and Modernization of the MACCS, MATC will transition from the ATNAVICS to the TPS-80 G/ATOR Radar, fielding in FY 2028. The TPS-80 will only fulfil the functions of an Expeditionary Airport Surveillance Radar (EASR), it will NOT fulfill the functions of Precision Approach Radar. A small form factor Expeditionary PAR system that is capable of multiple touchdown points, supports the Marine Corps' Expeditionary Advanced Base Operations (EABO) concept, and compliments the Ground/Air Task-Oriented Radar (G/ATOR) Expeditionary Air Surveillance Radar (EASR) is required. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 18 of 81 P-1 Line #56 Volume 2 - 380 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 3 / MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) B Kits Recurring 2.1.1) Equipment - Non Organic - NonOrganic NonOrganic Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.500 4 / 5.100 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / 2.500 - / 5.100 13 / 18.189 / 18.189 - 19 / 25.789 / 25.789 - Non-Recurring 2.2.1) Equipment - Non Organic - ECO - Organic Subtotal: Non-Recurring - Subtotal: MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) Subtotal: Procurement, All Modification Items - / - - / - - / - - / - - / - - / - - / - - / - - / 0.182 - / 0.279 - / 1.533 - / 1.994 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / 0.182 - / 0.279 - / 1.533 - / 1.994 / - - / - - / - - / - - / - - / - - / - - / - / 0.000 - / - - / - - / - - / - - / - - / - - / - 2 / 2.682 - 4 / 5.379 / 2.682 - / 5.379 13 / 19.722 / 19.722 - 19 / 27.783 / 27.783 - Support (All Modification Items) 3.1) Integrated Logistics Support - / - - / - - / - - / - - / - - / - - / - - / - / - - / 0.163 - / 0.632 - / 0.795 3.2) Production Engineering - / - - / - - / - - / - - / - - / - - / - - / - - / 0.761 - / 0.760 - / 2.369 - / 3.890 - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / 0.761 - / 0.923 - / 3.001 - / 4.685 Modification Item 1 of 1: MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) - / 0.000 / 0.000 - / 0.000 - / 0.218 - / 2.550 - / 2.768 Subtotal: Installation - / 0.000 / - - / 0.218 - / 2.550 - / 2.768 Subtotal: Support - Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 19 of 81 0.000 0.000 0.000 P-1 Line #56 3.443 6.520 25.273 35.236 Volume 2 - 381 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) MDAP/MAIS Code: Modification Item 1 of 1: MJ470 Expeditionary Precision Approach Radar (EPAR) (Modernization) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2030 FY 2031 Contract Dates FY 2028 FY 2029 Dec 2029 Dec 2030 Delivery Dates Dec 2030 Dec 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment - Non Organic - NonOrganic Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.218 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.878 4 / 0.878 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / 1.672 13 / 1.672 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.218 17 / 2.550 19 / 2.768 Installation Cost 0 / 0.000 2 / 0.218 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1 - 17 19 Out - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1 - 17 19 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 20 of 81 P-1 Line #56 Volume 2 - 382 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / MJ475 MATCALS TPX-57 (Modernization) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 4.586 2.821 3.581 1.446 0.000 12.434 Total - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 4.586 2.821 3.581 1.446 0.000 12.434 - - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 4.586 2.821 3.581 1.446 0.000 12.434 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The TPX-57 is an aging critical component of the Air Traffic Navigation Integration and Coordination System (ATNAVICS) that is facing end of service life and increasing fleet cost of repair. This refresh will alleviate the obsolescence issues, reduce sustainment costs, and will capitalize on the next-generation interrogator technology and provides a future path to enhanced ATNAVICS capabilities. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 21 of 81 P-1 Line #56 Volume 2 - 383 === page 464 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Expeditionary TPX-57 Technology Refresh Prior Years Financial Plan Modification Number / Title: 4 / MJ475 MATCALS TPX-57 (Modernization) Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: MJ475 MATCALS TPX-57 (Modernization) B Kits Recurring 2.1.1) Equipment - Non Organic - NonOrganic NonOrganic Subtotal: Recurring - / - - / - - / - - / - - / - - / - 4 / 1.520 4 / 1.520 / 0.000 - / - - / - - / - - / - - / - - / 1.520 / - - / - - / - - / - - / - - / - - / 2.055 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.000 - / - - / - - / - - / - - / - - / 3.575 - / 1.520 / 1.520 - 6 / 2.280 - / - / 2.280 - / - - / - - / - - - - / - 14 / 5.320 / 0.000 - / 5.320 / - - / 2.055 / 0.000 - / 2.055 Non-Recurring 2.2.1) Equipment - Non Organic - ECO - Organic Organic Subtotal: Non-Recurring - Subtotal: MJ475 MATCALS TPX-57 (Modernization) Subtotal: Procurement, All Modification Items - / 2.055 4 / 3.575 - / - - / - / - - / - 6 / 2.280 - / - - / 2.280 - / - 4 / 1.520 - / - 14 / 7.375 / 0.000 - / 7.375 Support (All Modification Items) 3.1) Integrated Logistics Support - / - - / - - / - - / - - / - - / - - / 0.154 - / 0.154 - / 0.154 - / 0.154 - / - - / 0.616 3.2) Production Engineering - / - - / - - / - - / - - / - - / - - / 0.857 - / 0.857 - / 0.857 - / 0.857 - / - - / 3.428 - / 0.000 - / - - / - - / - - / - - / - - / 1.011 - / 1.011 - / 1.011 - / 1.011 - / 0.000 - / 4.044 Modification Item 1 of 1: MJ475 MATCALS TPX-57 (Modernization) - / 0.000 / 0.000 - / 0.000 - / 0.290 - / 0.290 - / 0.435 - / 0.000 - / 1.015 Subtotal: Installation - / 0.000 / - - / 0.290 - / 0.290 - / 0.435 - / 0.000 - / 1.015 Subtotal: Support Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 22 of 81 0.000 4.586 2.821 P-1 Line #56 3.581 1.446 0.000 12.434 Volume 2 - 384 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / MJ475 MATCALS TPX-57 (Modernization) MDAP/MAIS Code: Modification Item 1 of 1: MJ475 MATCALS TPX-57 (Modernization) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 11 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Mar 2028 Mar 2029 Mar 2030 FY 2031 Delivery Dates Feb 2029 Feb 2030 Feb 2031 Installation Information Method of Implementation: AIT:: Installation Name: Equipment - Non Organic - NonOrganic Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 0.290 - / - - / - 0 / 0.000 4 / 0.290 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.290 - / - 0 / 0.000 4 / 0.290 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.435 0 / 0.000 6 / 0.435 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 4 / 0.290 Installation Cost 4 / 0.290 6 / 0.435 0 / 0.000 14 / 1.015 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 2 2 - 2 2 - - 2 2 2 - - 14 Out - - - - - - - - - - - - - - - - - - 2 2 - 14 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 23 of 81 - 2 2 - 2 P-1 Line #56 2 - - 2 Volume 2 - 385 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 6.518 4.531 3.689 0.000 3.689 2.252 0.841 0.000 - - - - - - - - - 0.000 6.518 4.531 3.689 0.000 3.689 2.252 0.841 0.000 - - - - - - - - - 0.000 6.518 4.531 3.689 0.000 3.689 2.252 0.841 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Air Traffic Navigation Integration and Coordination System (ATNAVICS) current system is an aging system that is plagued with obsolescence issues and increasing sustainment costs. This refresh will alleviate the obsolescence issues, reduce sustainment costs and will capitalize on emerging technology that supports the Marine Corps' Expeditionary Advanced Base Operations Concept. This system will need to meet all current requirements and will be a one for one replacement. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 24 of 81 P-1 Line #56 Volume 2 - 386 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh B Kits Recurring 1.1.1) Equipment - Non Organic - NonOrganic - (10) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 0.000 - Subtotal: MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh / - - 7 / 5.408 - / - / 5.408 3 / 2.318 - 7 / 5.408 / 2.318 - 3 / 2.318 3 / 2.318 - / - / 2.318 - / - 3 / 2.318 - / - 3 / 2.318 - / 2.318 - 3 / 2.318 1 / 0.773 - / - - / - - / - / 0.773 - / - - / - - / - 1 / 0.773 - / - - / - - / - - / - - / - - / - / 0.000 - / 5.408 - / 2.318 - / 2.318 - / - - / 2.318 - / 0.773 - / / 0.000 - / / 0.000 - 14 / 10.817 / 10.817 - 14 / 10.817 / 10.817 - Support (All Modification Items) 2.1) ILS - / - - / 0.194 - / 0.198 - / 0.202 - / - - / 0.202 - / 0.194 - / 0.194 - / - - / - 2.2) PE - / - - / 0.871 - / 0.671 - / 0.593 - / - - / 0.593 - / 0.709 - / 0.647 - / - - / - Continuing Continuing - / 0.000 - / 1.065 - / 0.869 - / 0.795 - / - - / 0.795 - / 0.903 - / 0.841 - / - - / - Continuing Continuing Modification Item 1 of 1: MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh - / 0.000 - / 0.045 - / 1.344 - / 0.576 / 0.000 - / 0.576 - / 0.576 - / 0.000 / 0.000 - / 0.000 - / 2.541 Subtotal: Installation - / 0.000 - / 0.045 - / 1.344 - / 0.576 / - - / 0.576 - / 0.576 / - - / 0.000 - / 2.541 0.000 Continuing Subtotal: Support - / - - / 0.982 Installation - - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 6.518 4.531 3.689 0.000 UNCLASSIFIED Page 25 of 81 3.689 2.252 0.841 P-1 Line #56 0.000 Continuing Volume 2 - 387 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh MDAP/MAIS Code: Modification Item 1 of 1: MJ485 AN/TPN-31(V)7 ATNAVICS Technical Refresh Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Delivery Dates Aug 2025 Aug 2026 Aug 2027 Aug 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment - Non Organic Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.045 / - 6 / 1.152 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 1.197 FY 2026 - / - - / - 1 / 0.192 2 / 0.384 0 / 0.000 2 / 0.384 - / - - / - - / - - / - 0 / 0.000 3 / 0.576 FY 2027 - / - - / - - / - 1 / 0.192 0 / 0.000 1 / 0.192 2 / 0.384 - / - - / - - / - 0 / 0.000 3 / 0.576 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.192 - / - - / - - / - 0 / 0.000 1 / 0.192 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 1 / 0.045 3 / 0.576 - / - - / - - / - 0 / 0.000 7 / 1.344 3 / 0.576 0 / 0.000 3 / 0.576 / - - / - 14 / 2.541 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 1 2 2 2 1 1 1 - 1 1 1 - 1 - - - - - - - - - - - - - 14 Out - - - - 1 2 2 2 1 1 1 - 1 1 1 - 1 - - - - - - - - - - - - - 14 Footnotes: (10) Funding is reprioritized to accelerate ATNAVICS Tech Refresh efforts to support USMC Force Design 2030 and align with ATC Naval Aircraft Requirements Group priorities. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 26 of 81 P-1 Line #56 Volume 2 - 388 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / CB010 - DoW Advanced Automation System (DAAS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 14.455 0.440 0.448 0.456 0.000 0.456 0.464 0.473 0.482 - - - - - - - - - 14.455 0.440 0.448 0.456 0.000 0.456 0.464 0.473 0.482 - - - - - - - - - 14.455 0.440 0.448 0.456 0.000 0.456 0.464 0.473 0.482 To FY 2031 Complete 0.492 Continuing - Continuing - 0.492 Continuing - Total - Continuing - - 0.492 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The DoW Advanced Automation System (DAAS) is being developed as part of a joint DoW/Federal Aviation Administration (FAA) program to modernize and standardize Air Traffic Control (ATC) equipment in the National Airspace System. The systems are installed in Navy ATC facilities to replace aging, obsolete equipment and comply with joint DoW/FAA modernization program agreements. DAAS provides for processors and displays for tower and approach controls. Inventory objective of 40. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 27 of 81 P-1 Line #56 Volume 2 - 389 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: NAS Related RDT&E PEs: 0604504N Modification Type: Added Capability Prior Years Financial Plan Modification Number / Title: 6 / CB010 - DoW Advanced Automation System (DAAS) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB010 - DoW Advanced Automation System (DAAS) B Kits Recurring 2.1.1) End Item - NonOrganic 2.1.2) ECP/OCIR - Organic (11) Subtotal: Recurring 4 / 2.751 - / - - / - / 4.992 - - / 0.440 / - - / 0.448 / - - / 0.456 - / - - - / 0.456 / - - / 0.464 / - - / 0.473 / - - / 0.482 / - - / 0.492 / - Continuing - / - Continuing 4 / 2.751 / 7.743 - / 0.440 - / 0.448 - / 0.456 - / - - / 0.456 - / 0.464 - / 0.473 - / 0.482 - / 0.492 Continuing Continuing 4 / 7.743 - / 0.440 - / 0.448 - / 0.456 - / - - / 0.456 - / 0.464 - / 0.473 - / 0.482 - / 0.492 Continuing Continuing - / 7.743 - / 0.440 - / 0.448 - / 0.456 - / - - / 0.456 - / 0.464 - / 0.473 - / 0.482 - / 0.492 Continuing Continuing 3.1) Integrated Logistics Support - / 0.298 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.298 3.2) Production Engineering - / 1.667 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.667 - / 1.965 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 1.965 Modification Item 1 of 1: CB010 - DoW Advanced Automation System (DAAS) - / 4.747 / 0.000 - / 0.000 - / 4.747 Subtotal: Installation - / 4.747 / - - / 0.000 - / 4.747 0.492 Continuing - Subtotal: CB010 - DoW Advanced Automation System (DAAS) Subtotal: Procurement, All Modification Items Support (All Modification Items) Subtotal: Support Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 14.455 0.440 0.448 0.456 0.000 UNCLASSIFIED Page 28 of 81 0.456 0.464 0.473 P-1 Line #56 0.482 Continuing Volume 2 - 390 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / CB010 - DoW Advanced Automation System (DAAS) MDAP/MAIS Code: Modification Item 1 of 1: CB010 - DoW Advanced Automation System (DAAS) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: End Item Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 4.747 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 4.747 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 4 / 4.747 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 4.747 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 Out 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 Footnotes: (11) ECP costs are based on site unique software configurations. Upgrades are driven by the FAA's Surveillance Interface Modernization (SIM) program. These upgrades are required to maintain radar connectivity with the FAA in order to preserve Fleet capability to sequence and separate aircraft in assigned airspace within the National Airspace System. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 29 of 81 P-1 Line #56 Volume 2 - 391 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / CB030 Digital Airport Surveillance Radar (DASR) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 4.134 0.666 0.680 0.692 0.000 0.692 0.704 1.096 1.118 - - - - - - - - - 4.134 0.666 0.680 0.692 0.000 0.692 0.704 1.096 1.118 - - - - - - - - - 4.134 0.666 0.680 0.692 0.000 0.692 0.704 1.096 1.118 To FY 2031 Complete 1.140 Continuing - Continuing - 1.140 Continuing - Total - Continuing - - 1.140 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The DASR was developed as part of a joint DoW/ FAA program to modernize and standardize ATC equipment in the National Airspace System. The DASR has enabled Navy ATC facilities to replace aging, obsolete approach control radars and comply with joint DoW/FAA modernization program agreements. Inventory objective of 28 DASR. 28 were procured and installed prior to FY 2017 were funded under BLI 2840. The FAA DASR technical refreshment has not progressed as planned and has been reorganized into multiple Engineering Change Proposals (ECPs) to mitigate obsolescence effective FY 2017 to address these upgrades. The FAA and DoW will be investigating a potential service life extension and/or DASR replacement beginning in FY 2029. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 30 of 81 P-1 Line #56 Volume 2 - 392 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: NAS Related RDT&E PEs: 0604504N Modification Type: Added Capability Prior Years Financial Plan Modification Number / Title: 7 / CB030 Digital Airport Surveillance Radar (DASR) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB030 Digital Airport Surveillance Radar (DASR) B Kits Recurring 1.1.2) ECP/OCIR - Organic (12) Subtotal: Recurring Subtotal: CB030 Digital Airport Surveillance Radar (DASR) Subtotal: Procurement, All Modification Items - / 4.134 - / 0.666 - / 0.680 - / 0.692 - / - - / 0.692 - / 0.704 - / 1.096 - / 1.118 - / 1.140 Continuing Continuing - / 4.134 - / 0.666 - / 0.680 - / 0.692 - / - - / 0.692 - / 0.704 - / 1.096 - / 1.118 - / 1.140 Continuing Continuing - / 4.134 - / 0.666 - / 0.680 - / 0.692 - / - - / 0.692 - / 0.704 - / 1.096 - / 1.118 - / 1.140 Continuing Continuing - / 4.134 - / 0.666 - / 0.680 - / 0.692 - / - - / 0.692 - / 0.704 - / 1.096 - / 1.118 - / 1.140 Continuing Continuing / - - / - Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - 1.140 Continuing - / - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 4.134 0.666 0.680 0.692 0.000 UNCLASSIFIED Page 31 of 81 0.692 0.704 1.096 P-1 Line #56 1.118 Continuing Volume 2 - 393 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / CB030 Digital Airport Surveillance Radar (DASR) MDAP/MAIS Code: Modification Item 1 of 1: CB030 Digital Airport Surveillance Radar (DASR) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Footnotes: (12) The Digital Airport Surveillance Radar (DASR) ECP/OCIR upgrades are required to maintain radar connectivity with the FAA in order to preserve Fleet capability to sequence and separate aircraft in assigned airspace within the National Airspace System. The Digital Airport Surveillance Radar (DASR) will be upgraded from legacy point to point analog interface capability to flexible Internet Protocol (IP) addressable interfaces. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 32 of 81 P-1 Line #56 Volume 2 - 394 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / CB040 Tower Automation System (TAS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 5.533 0.339 0.345 0.352 0.000 0.352 0.370 0.377 0.385 - - - - - - - - - 5.533 0.339 0.345 0.352 0.000 0.352 0.370 0.377 0.385 - - - - - - - - - 5.533 0.339 0.345 0.352 0.000 0.352 0.370 0.377 0.385 To FY 2031 Complete 0.393 Continuing - Continuing - 0.393 Continuing - Total - Continuing - - 0.393 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The TAS was developed as part of a joint DoW/ FAA program to modernize and standardize ATC equipment in the National Airspace System. The TAS has enabled Navy ATC facilities to replace aging, obsolete equipment and comply with joint DoW/FAA modernization program agreements. This effort includes Engineering Change Proposal (ECP) efforts directly related to the TAS Tech Refresh efforts detailed in cost element CB100 of this budget. The ECP introduces new capability into a common workstation that eliminates a separate visual communications alert indicator. The nature of that consolidation creates an interdependency with CB100 (and CB120 starting in FY26); which addresses severe obsolescence issues that render the current workstation configuration unsupportable. Both software and hardware for these two cost elements overlap and require concurrent efforts. Delay or interruption to either CB040 and/or CB100 causes a break in fleet capability and negatively impacts both flight safety and operator workload. All Windows based operating systems in Air Traffic Control Towers are being upgraded to Windows 11 in order to meet DoW's Information Assurance / Cyber security requirements. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 33 of 81 P-1 Line #56 Volume 2 - 395 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: NAS Related RDT&E PEs: 0604504N Modification Type: Added Capability Prior Years Financial Plan Modification Number / Title: 8 / CB040 Tower Automation System (TAS) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB040 Tower Automation System (TAS) B Kits Recurring 1.1.1) ECP/OCIR - Organic (13) Subtotal: Recurring Subtotal: CB040 Tower Automation System (TAS) Subtotal: Procurement, All Modification Items - / 5.533 - / 0.339 - / 0.345 - / 0.352 - / - - / 0.352 - / 0.370 - / 0.377 - / 0.385 - / 0.393 Continuing Continuing - / 5.533 - / 0.339 - / 0.345 - / 0.352 - / - - / 0.352 - / 0.370 - / 0.377 - / 0.385 - / 0.393 Continuing Continuing - / 5.533 - / 0.339 - / 0.345 - / 0.352 - / - - / 0.352 - / 0.370 - / 0.377 - / 0.385 - / 0.393 Continuing Continuing - / 5.533 - / 0.339 - / 0.345 - / 0.352 - / - - / 0.352 - / 0.370 - / 0.377 - / 0.385 - / 0.393 Continuing Continuing / - - / - Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - 0.393 Continuing - / - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 5.533 0.339 0.345 0.352 0.000 UNCLASSIFIED Page 34 of 81 0.352 0.370 0.377 P-1 Line #56 0.385 Continuing Volume 2 - 396 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / CB040 Tower Automation System (TAS) MDAP/MAIS Code: Modification Item 1 of 1: CB040 Tower Automation System (TAS) Manufacturer Information Manufacturer Name: Naval Information Warfare Center Atlantic Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Footnotes: (13) Support costs are included in the ECP/OCIR lines. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 35 of 81 P-1 Line #56 Volume 2 - 397 === page 478 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 64.588 12.886 18.865 11.529 0.000 11.529 13.861 17.822 17.860 - - - - - - - - - 64.588 12.886 18.865 11.529 0.000 11.529 13.861 17.822 17.860 - - - - - - - - - 64.588 12.886 18.865 11.529 0.000 11.529 13.861 17.822 17.860 To FY 2031 Complete 20.311 Continuing - Continuing - 20.311 Continuing - Total - Continuing - - 20.311 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: FAA NAS Voice System (NVS) is a forward-looking program to replace national airspace system (NAS) voice switches with a new technology system capable of supporting future requirements for the NextGen. Many of these switches are experiencing increasing obsolescence and failures and are in need of replacement. They are not capable of supporting flexible reallocation of access to communications resources, and lack security needed for a network-based communications infrastructure, which is a key concept in modernization of the NAS. The NVS program will provide a key transitional element in the air traffic control voice communications infrastructure as it moves toward realizing the FAAs NextGen vision and a more operationally efficient and economic NAS. Radios: There are Seventy-five sites, which will receive a total of 4,156 radios, 272 Radio Transceivers and 141 Emergency Radios Transceivers. The sites to receive radios include Navy Air Stations, Marine Corps Air Stations, Fleet Area Control and Surveillance Facilities (FACSFACs) and FACSFAC remote sites. The number of radios per site varies due to operational requirements and the number of aircraft serviced. The Radio Inventory Objective is 4,516 which includes 360 Non-ATC radios whose procurements are being reassessed to support other Navy priorities. Voice Switches: There are two specific types of Voice Switches being procured: Operational Communication System (OCS) and Emergency Control System (ECS): 56 OCS Voice Switches, 42 ECS Voice Switches. Forty-two sites will receive both an OCS Voice Switch and an ECS Voice Switch, fourteen sites will receive only an OCS voice switch. While FACSFAC remote sites are equipped with radios, they are not equipped with Voice Switches. The Next Generation Voice Switch will be acquired under the FAA's Voice over Internet Protocol (IP) Communication Enterprise (VoICE) program. The FAA Next Generation Voice Switch In Service Decision (ISD) schedule is being reassessed to support other Navy priorities. Voice Switch Tech Refresh: The FAA is pursuing a technical refresh of their Small Terminal Voice Switch (STVS) equipment. Engineering change proposals introduced under this technical refresh will be procured by the Navy and installed in the ETVSs. The FAA is expected to develop other modifications as necessary to sustain the existing systems. There is also an FAA effort to replace Position Integration Project (PIP) modules that will introduce additional hardware that will be needed for future sustainment efforts. Navy has 740 PIP operator position-counts. The Navy and Air Force are pursuing a joint program to procure an ETVS replacement system which would be accomplished instead of the ETVS Tech Refresh at some of our Air Stations. Total ETVS systems required: Fifty-six (56) OCS Voice Switches and 42 ECS Voice Switches. NOTE - The FAA has initiated an Emergency Radio Transceiver Replacement Program. The Navy will procure 141 Transceivers under this FAA program to replace AN/GRC-258 Emergency Transceivers, which have become obsolete and are no longer supported by the Manufacturer. The Radio Inventory Objective has been reduced due to Non-ATC radio requirements being removed from the program. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 36 of 81 P-1 Line #56 Volume 2 - 398 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CB080 NAS Voice System (NVS) B Kits Recurring 2.1.2) Radios - NonOrganic (14) 2.1.3) Transceivers - NonOrganic 4,156 / 35.967 - / - - / - - / - - / - - / - 141 / 4.443 - / / - - / - - / - - / - - / - - / - - / - 360 / 5.040 - / - - / - - / - - / - - / - - 2.1.4) OCS Voice Switch - NonOrganic (15) - / - - / - - / - - / - - / - - / - 1 / 1.000 5 / 5.500 5 / 6.000 6 / 7.344 39 / 52.935 56 / 72.779 2.1.5) ECS Voice Switch - NonOrganic (16) - / - - / - - / - - / - - / - - / - 1 / 0.325 8 / 2.798 5 / 1.875 5 / 1.913 23 / 9.659 42 / 16.570 2.1.6) Voice SwitchTech Refresh - NonOrganic - / - 17 / 7.900 - / - 17 / 7.900 16 / 8.631 4 / 2.201 (17) - / - 8 / 0.080 - / - 8 / 0.080 40 / 0.440 110 / 1.320 - / - - 2.1.7) UHF/VHF VOIP Radios - NonOrganic 2.1.8) VOIP Transceivers - NonOrganic (18) Subtotal: Recurring Subtotal: CB080 NAS Voice System (NVS) Subtotal: Procurement, All Modification Items / 40.410 - 4,297 / 40.410 / 40.410 - 24 / 10.500 - / - - / - / 10.500 - 24 / 10.500 / 10.500 - 33 / 15.015 - / - - / - / 15.015 - 33 / 15.015 - / - - / - / 7.980 - / - - 25 / 7.980 - / - 25 / 7.980 - - / / 7.980 / 15.015 - / 7.980 - / - - / 7.980 10 / 0.500 / 10.896 - 68 / 10.896 / 10.896 - 20 / 1.100 / 12.919 - 147 / 12.919 - - / - 75 / 0.975 - / 9.450 95 / 9.450 / 12.919 - / 9.450 / - 130 / 1.690 10 / 0.600 - 15 / 0.918 / 11.865 - - 4,516 / 41.007 / - 141 / 4.443 4 / 2.348 98 / 46.595 4,153 / 75.585 4,516 / 80.090 217 / 15.936 - / 161.503 272 / 19.054 - / 280.538 156 / 11.865 4,796 / 161.503 9,641 / 280.538 / 11.865 - - / 161.503 - / 280.538 Support (All Modification Items) 3.1) Integrated Logistics Support - / 1.780 - / 0.320 - / 0.494 - / 0.425 - / - - / 0.425 - / 0.528 - / 0.605 - / 0.688 - / 0.990 Continuing Continuing 3.2) Production Engineering - / 5.260 - / 1.102 - / 2.200 - / 1.474 - / - - / 1.474 - / 1.473 - / 2.224 - / 2.178 - / 2.871 Continuing Continuing - / 7.040 - / 1.422 - / 2.694 - / 1.899 - / - - / 1.899 - / 2.001 - / 2.829 - / 2.866 - / 3.861 Continuing Continuing / 0.000 - / 1.650 - / 0.964 - / 2.074 - / 5.544 - / 4.585 - / 104.821 - / 138.896 / - - / 1.650 - / 0.964 - / 2.074 - / 5.544 - / 4.585 - / 104.821 - / 138.896 Subtotal: Support Installation Modification Item 1 of 1: CB080 NAS Voice System (NVS) - / 17.138 - / 0.964 - / 1.156 - / 1.650 Subtotal: Installation - / 17.138 - / 0.964 - / 1.156 - / 1.650 - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 64.588 12.886 18.865 11.529 0.000 UNCLASSIFIED Page 37 of 81 11.529 13.861 17.822 P-1 Line #56 17.860 20.311 Continuing Continuing Volume 2 - 399 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Manufacturer Information Manufacturer Name: General Dynamics Manufacturer Location: Scottsdale, Arizona Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: TBD - FAA Contract 1 Manufacturer Location: TBD Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2029 Mar 2030 Mar 2031 Mar 2032 Manufacturer Name: TBD - FAA Contract 2 Manufacturer Location: TBD Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 Contract Dates Delivery Dates FY 2028 FY 2029 FY 2030 FY 2031 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2029 Mar 2030 Mar 2031 Mar 2032 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Name: TBD - FAA Contract 3 Manufacturer Location: TBD Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Manufacturer Name: General Dynamics (via FAA contract) FY 2025 Mar 2029 Manufacturer Location: Scottsdale, AZ Administrative Leadtime (in Months): 6 Dates FY 2029 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 38 of 81 P-1 Line #56 Volume 2 - 400 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Installation Information Method of Implementation: AIT:: Installation Name: Radios Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4,034 / 16.858 122 / 0.686 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4,156 / 17.544 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 360 / 1.288 360 / 1.288 - / - - / - - / - - / - - / - - / - - / - - / - 360 / 1.288 4,516 / 18.832 Installation Cost Total 4,034 / 16.858 122 / 0.686 Installation Schedule FY 2025 PYS Q1 In 4,034 Out 4,034 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC - 60 62 - - - - - - - - - - - - - - - - - - - - - - - - - 360 4,516 - - 60 62 - - - - - - - - - - - - - - - - - - - - - - - - 360 4,516 Tot Method of Implementation: AIT:: Installation Name: Transceivers Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 70 / 0.280 71 / 0.278 141 / 0.558 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 39 of 81 P-1 Line #56 Volume 2 - 401 === page 482 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Installation Information Method of Implementation: AIT:: Installation Name: Transceivers Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 70 / 0.280 71 / 0.278 - - - - - - - - 0 / 0.000 141 / 0.558 Total / - / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 70 - 35 36 - - - - - - - - - - - - - - - - - - - - - - - - - - 141 Out 70 - 35 36 - - - - - - - - - - - - - - - - - - - - - - - - - - 141 Method of Implementation: Alteration Installation Team (AIT):: Installation Name: OCS Voice Switch Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.550 - / - - / - 0 / 0.000 1 / 0.550 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.805 - / - 0 / 0.000 5 / 2.805 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.866 0 / 0.000 5 / 2.866 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 3.508 6 / 3.508 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 39 / 25.084 39 / 25.084 Total - / - - / - - / - - / - - / - - / - - / - 1 / 0.550 5 / 2.866 45 / 28.592 56 / 34.813 Installation Cost 5 / 2.805 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - - 2 3 - - 2 3 - 45 56 Out - - - - - - - - - - - - - - - - - - - - 45 56 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 40 of 81 - 1 - P-1 Line #56 2 3 - - 2 3 Volume 2 - 402 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: ECS Voice Switch Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.120 - / - - / - 0 / 0.000 1 / 0.120 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 8 / 0.979 - / - 0 / 0.000 8 / 0.979 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.624 0 / 0.000 5 / 0.624 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.637 5 / 0.637 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 3.104 23 / 3.104 Total - / - - / - - / - - / - - / - - / - - / - 1 / 0.120 5 / 0.624 28 / 3.741 42 / 5.464 Installation Cost 8 / 0.979 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - - 2 3 3 - 2 3 - 28 42 Out - - - - - - - - - - - - - - - - - - - - 2 3 3 - 28 42 - 1 - 2 3 Method of Implementation: AIT:: Installation Name: Voice SwitchTech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 24 / 1.156 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 24 / 1.156 FY 2026 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 33 / 1.650 FY 2027 - / - - / - - / - - / - - / - - / - 17 / 0.884 - / - - / - - / - 0 / 0.000 17 / 0.884 FY 2028 - / - - / - - / - - / - - / - - / - - / - 16 / 0.864 - / - - / - 0 / 0.000 16 / 0.864 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.220 - / - 0 / 0.000 4 / 0.220 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.234 Installation Cost LI 2820 - Ashore ATC Equipment Navy 33 / 1.650 0 / 0.000 UNCLASSIFIED Page 41 of 81 33 / 1.650 P-1 Line #56 / - - / - 4 / 0.234 Volume 2 - 403 === page 484 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Installation Information Method of Implementation: AIT:: Installation Name: Voice SwitchTech Refresh Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - 24 / 1.156 33 / 1.650 0 / 0.000 33 / 1.650 17 / 0.884 16 / 0.864 4 / 0.220 4 / 0.234 98 / 5.008 Total / - / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 6 6 6 6 11 11 11 - 5 6 6 - - 8 8 - - 2 2 - - - - - 4 98 Out - - - - - 6 6 6 6 - 11 11 11 5 6 - - - - 4 98 - 6 - - 8 8 - - 2 2 Method of Implementation: Alteration Installation Team (AIT):: Installation Name: UHF/VHF VOIP Radios Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 8 / 0.080 - / - - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 40 / 0.440 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 110 / 1.320 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 8 / 0.080 Installation Cost 40 / 0.440 110 / 1.320 40 / 0.440 75 / 0.975 110 / 1.320 8 / 0.080 0 / 0.000 75 / 0.975 - / - 130 / 1.724 130 / 1.724 - / - 4,153 / 66.083 4,153 / 66.083 75 / 0.975 4,283 / 67.807 4,516 / 70.622 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In - - - - - - - - - - - - - - 8 - - - 20 20 - - 50 60 - - 35 40 - 4,283 4,516 Out - - - - - - - - - - - - - - - - - 20 20 - - 50 60 - - 35 40 4,283 4,516 LI 2820 - Ashore ATC Equipment Navy - 8 UNCLASSIFIED Page 42 of 81 P-1 Line #56 Tot Volume 2 - 404 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: Modification Item 1 of 1: CB080 NAS Voice System (NVS) Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: VOIP Transceivers Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 10 / 0.100 - / - - / - 0 / 0.000 10 / 0.100 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 20 / 0.220 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 0.120 0 / 0.000 10 / 0.120 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 0.184 15 / 0.184 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 217 / 2.975 217 / 2.975 Total - / - - / - - / - - / - - / - - / - - / - 10 / 0.120 232 / 3.159 272 / 3.599 Installation Cost 20 / 0.220 10 / 0.100 20 / 0.220 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 5 5 - - 10 10 - - 5 5 - 232 272 Out - - - - - - - - - - - - - - - - - - - - 10 10 - 232 272 - 5 5 - 5 5 Footnotes: (14) Radios: There are 75 sites, which will receive a total of 4,156 radios, 272 Radio Transceivers and 141 Emergency Radios Transceivers. The sites to receive radios include Navy Air Stations, Marine Corps Air Stations, Fleet Area Control and Surveillance Facilities (FACSFACs) and FACSFAC remote sites. The number of radios per site varies due to operational requirements and the number of aircraft serviced. The Radio Inventory Objective is 4,516 which includes 360 Non-ATC radios. (15) OCS Voice Switch End Item costs will be based on FAA estimated contract pricing. Inventory objective is 56. The Next Generation OCS Voice System will be acquired under the FAA's Voice over Internet Protocol (IP) Communication Enterprise (VoICE) program. (16) As directed by the Federal Aviation Administration (FAA) Reauthorization Act of 2024 and the H.R.1 - One Big Beautiful Bill Act passed by Congress and signed by the President on 4 July 2025, the FAA has accelerated the modernization of their Air Traffic Control (ATC) Communications, Surveillance, and Automation Systems. These systems are Joint FAA-DoW programs. In order for the Navy / Marine Corps to continue our participation in these programs, the funding in this Budget has been increased beginning in FY 2026. The FAA has initiated the procurement of their Brand-New Air Traffic Control System (BNATCS) for the National Airspace System (NAS). The FAA will not allow the DoW to procure the new Voice Switch under their contract until FY 2028. The Navy plan for the procurement of Voice Switches for our Operational Communications System (OCS) and Emergency Communications System (ECS) is being restructured. (17) The FAA has initiated the Next Generation Communications (NEXCOM) Phase 3 Program under which they will replace current UHF/VHF Air-to-Ground Radios with Voice Over Internet Protocol (VOIP) Radios. The Navy/Marine Corps Air-to-Ground Radios are ten years old and experiencing increasing maintenance costs. End Item costs are based on FAA contract pricing. Inventory objective is 4,516. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 43 of 81 P-1 Line #56 Volume 2 - 405 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CB080 NAS Voice System (NVS) MDAP/MAIS Code: (18) The Navy/Marine Corps UHF/VHF Transceivers are 10 years old and experiencing increasing maintenance Costs and are not VOIP capable. The new VOIP Transceivers will be procured under a Navy contract. Inventory objective is 272. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 44 of 81 P-1 Line #56 Volume 2 - 406 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 10 / CB090 - DAAS Tech Refresh Upgrade II MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 13.680 9.343 14.158 12.448 0.000 12.448 14.734 11.117 9.815 - - - - - - - - - 13.680 9.343 14.158 12.448 0.000 12.448 14.734 11.117 9.815 - - - - - - - - - 13.680 9.343 14.158 12.448 0.000 12.448 14.734 11.117 9.815 To FY 2031 Complete 6.251 Continuing - Continuing - 6.251 Continuing - Total - Continuing - - 6.251 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Standard Terminal Automation Replacement System (STARS) is a joint DoW and Department of Transportation Federal Aviation Administration (FAA) program to modernize terminal air traffic control systems. The DoW version of STARS, DoW Advanced Automation System (DAAS), must be upgraded to ensure continued compliance with FAA NextGen requirements in order to continue participation in the National Airspace System (NAS). Currently fielded STARS COTS equipment/software are experiencing obsolescence and information assurance (IA) issues. The DAAS Tech Refresh Upgrades will address these obsolescence and IA issues as well as maintain compatibility with the FAA's Next Generation (NextGen) Air Transportation System initiatives. Inventory objective is 40. The DAAS Tech Refresh Upgrade II efforts will implement Engineering Change Proposals (ECPs) defined under cost element CB010 (DoW Advanced Automation System (DAAS)) of this budget. The nature of this consolidation creates an interdependency between CB010 and CB090 that addresses obsolescence and IA issues that render the current hardware and software unsupportable. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB010 and /or CB090 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. CB090 is a follow-on to CB050 (STARS Tech Refresh Upgrade) which completed procurements in FY 2020. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 45 of 81 P-1 Line #56 Volume 2 - 407 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / CB090 - DAAS Tech Refresh Upgrade II MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: Added Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CB090 - DAAS Tech Refresh Upgrade II B Kits Recurring 2.1.1) DAAS Tech Refresh Upgrade II - NonOrganic 6 / 8.199 (19) Subtotal: Recurring - Subtotal: CB090 - DAAS Tech Refresh Upgrade II Subtotal: Procurement, All Modification Items / 8.199 5 / 7.022 - 6 / 8.199 / 7.022 7 / 10.031 - / 8.199 - / 7.022 3.1) Integrated Logistics Support - / 0.499 - / 0.175 (20) - / 2.822 - / 1.041 - / 3.321 - Modification Item 1 of 1: CB090 - DAAS Tech Refresh Upgrade II - / 2.160 Subtotal: Installation - / 2.160 / 10.031 - 5 / 7.022 - 7 / 10.031 5 / 7.307 - / - / 7.307 - / - 5 / 7.307 - / - 5 / 7.307 - / 7.307 - / 7.307 - / - - / 7.307 - / 0.215 - / 0.185 - / - - / 0.185 - / 1.062 - / 0.889 - / - - / 0.889 / 1.216 - / 1.277 - / 1.074 - / - - - / 1.105 - / 2.850 - / 4.067 / 0.000 - / 1.105 - / 2.850 - / 4.067 / - / 10.510 - 5 / 7.307 / 10.031 - 7 / 10.510 4 / 6.124 - 7 / 10.510 / 6.124 4 / 6.246 - 4 / 6.124 / 6.246 2 / 3.185 - 4 / 6.246 / 3.185 - / 0.000 - 2 / 3.185 / - - / - - / 58.624 40 / 58.624 / 10.510 - / 6.124 - / 6.246 - / 3.185 - - / 0.255 - / 0.150 - / 0.200 - / 0.100 Continuing Continuing - / 0.968 - / 0.609 - / 0.900 - / 0.450 Continuing Continuing / 1.074 - / 1.223 - / 0.759 - / 1.100 - / 0.550 Continuing Continuing - / 4.067 - / 3.001 - / 4.234 - / 2.469 - / 2.516 - / 1.283 - / 23.685 - / 4.067 - / 3.001 - / 4.234 - / 2.469 - / 2.516 - / 1.283 - / 23.685 6.251 Continuing - / 0.000 40 / 58.624 - / 58.624 Support (All Modification Items) 3.2) Production Engineering Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 13.680 9.343 14.158 12.448 0.000 UNCLASSIFIED Page 46 of 81 12.448 14.734 11.117 P-1 Line #56 9.815 Continuing Volume 2 - 408 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / CB090 - DAAS Tech Refresh Upgrade II MDAP/MAIS Code: Modification Item 1 of 1: CB090 - DAAS Tech Refresh Upgrade II Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 FY 2030 FY 2031 Manufacturer Name: Raytheon Manufacturer Location: Fullerton, CA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Mar 2025 Mar 2026 Delivery Dates Mar 2026 Mar 2027 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: DAAS Tech Refresh Upgrade II Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 2.160 2 / 1.105 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 3.265 FY 2025 - / - - / - 5 / 2.850 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 2.850 FY 2026 - / - - / - - / - 7 / 4.067 0 / 0.000 7 / 4.067 - / - - / - - / - - / - 0 / 0.000 7 / 4.067 FY 2027 - / - - / - - / - - / - - / - - / - 5 / 3.001 - / - - / - - / - 0 / 0.000 5 / 3.001 FY 2028 - / - - / - - / - - / - - / - - / - - / - 7 / 4.234 - / - - / - 0 / 0.000 7 / 4.234 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.469 - / - 0 / 0.000 4 / 2.469 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.516 0 / 0.000 4 / 2.516 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.283 2 / 1.283 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 4 / 2.160 Installation Cost LI 2820 - Ashore ATC Equipment Navy 2 / 1.105 5 / 2.850 7 / 4.067 0 / 0.000 UNCLASSIFIED Page 47 of 81 7 / 4.067 5 / 3.001 7 / 4.234 P-1 Line #56 4 / 2.469 4 / 2.516 / - 2 / 1.283 - / - 40 / 23.685 Volume 2 - 409 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / CB090 - DAAS Tech Refresh Upgrade II MDAP/MAIS Code: Modification Item 1 of 1: CB090 - DAAS Tech Refresh Upgrade II Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: DAAS Tech Refresh Upgrade II Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - 1 1 - - 2 2 1 - 3 2 2 - 2 1 2 - 2 2 3 - 2 2 - - 2 2 - 2 40 Out 4 - 1 1 - - 2 2 1 - 3 2 2 - 2 1 2 - 2 2 3 - 2 40 - 2 2 - - 2 2 Footnotes: (19) As directed by the Federal Aviation Administration (FAA) Reauthorization Act of 2024 and the 2025 House of Representatives Committee on Transportation and Infrastructure Budget Reconciliation, the FAA has accelerated the modernization of their Air Traffic Control (ATC) Communications, Surveillance, and Automation Systems. These systems are Joint FAA-DoW programs. (20) Production Engineering costs include identifying projected system requirements, modifications adjustments, preparation for integrating planning, and drawing support efforts. Preparing for the receipt, integration, and installation of future, identified equipment often requires significant planning. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 48 of 81 P-1 Line #56 Volume 2 - 410 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 11 / CB100 TAS Tech Refresh Upgrade II MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 53.873 4.657 0.580 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 59.110 Total - - - - - - - - - - - - 53.873 4.657 0.580 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 59.110 - - - - - - - - - - - - 53.873 4.657 0.580 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 59.110 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/FYC-22 Visual Information Display System (VIDS) is the Navy developed/owned system that meets the NAS Mod Tower Automation System (TAS) requirements. The Tower Automation System (TAS) COTS equipment is suffering from obsolescence and Information Assurance (IA) issues. The TAS Tech Refresh Upgrades will address these obsolescence and IA issues as well as maintain compatibility with the FAAs Next Generation (NextGen) Air Transportation System initiatives. The TAS will be upgraded to maintain interoperability and compliance with the FAA ATC systems. The inventory objective is 56. The TAS Tech Refresh Upgrade II efforts will implement Engineering Change Proposals (ECPs) defined under cost element CB040 (Tower Automation System (TAS)) of this budget. The nature of this consolidation creates an interdependency between CB040 and CB100 that addresses obsolescence and IA issues that render the current hardware and software unsupportable. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB040 and /or CB100 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. CB100 is a follow-on to CB070 (TAS Tech Refresh) which completed procurements in FY 2020. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 49 of 81 P-1 Line #56 Volume 2 - 411 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 11 / CB100 TAS Tech Refresh Upgrade II Modification Type: Added Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB100 TAS Tech Refresh Upgrade II B Kits Recurring 2.1.1) TAS Tech Refresh Upgrade II - NonOrganic Subtotal: Recurring Subtotal: CB100 TAS Tech Refresh Upgrade II Subtotal: Procurement, All Modification Items 54 / 34.847 / 34.847 - - 54 / 34.847 - 2 / 1.380 - / - - / - - / - - / - - / - - / - - / - - / - / 1.380 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.380 - / - - / - - / - - / - - / - - / - - / - - / - / 34.847 - / 1.380 - / - - / - - / - - / - - / - - / - - / - - / - - / / 0.000 - / / 0.000 - 56 / 36.227 / 36.227 - 56 / 36.227 / 36.227 - Support (All Modification Items) 3.1) Integrated Logistics Support - / 1.503 - / 0.205 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.708 3.2) Production Engineering - / 5.622 - / 0.832 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.454 - / 7.125 - / 1.037 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 8.162 / 0.000 - / 0.000 - / 14.721 / - - / 0.000 - / 14.721 Subtotal: Support Installation Modification Item 1 of 1: CB100 TAS Tech Refresh Upgrade II - / 11.901 - / 2.240 - / 0.580 Subtotal: Installation - / 11.901 - / 2.240 - / 0.580 - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 53.873 4.657 0.580 0.000 0.000 UNCLASSIFIED Page 50 of 81 0.000 0.000 0.000 P-1 Line #56 0.000 0.000 0.000 59.110 Volume 2 - 412 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 11 / CB100 TAS Tech Refresh Upgrade II MDAP/MAIS Code: Modification Item 1 of 1: CB100 TAS Tech Refresh Upgrade II Manufacturer Information Manufacturer Name: NIWC Atlantic Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Mar 2025 Delivery Dates Mar 2026 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: TAS Tech Refresh Upgrade II Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 46 / 11.901 Prior Years 8 / 2.240 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 54 / 14.141 FY 2025 - / - - / - 2 / 0.580 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.580 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.580 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 46 / 11.901 8 / 2.240 56 / 14.721 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 46 - - 4 4 - - 1 1 - - - - - - - - - - - - - - - - - - - - - 56 Out 46 - - 4 4 - - 1 1 - - - - - - - - - - - - - - - - - - - - - 56 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 51 of 81 P-1 Line #56 Volume 2 - 413 === page 494 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 12 / CB110 DASR Tech Refresh Upgrade III MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 12.960 6.958 4.152 0.567 0.000 0.567 0.000 0.000 0.000 0.000 0.000 24.637 Total - - - - - - - - - - - - 12.960 6.958 4.152 0.567 0.000 0.567 0.000 0.000 0.000 0.000 0.000 24.637 - - - - - - - - - - - - 12.960 6.958 4.152 0.567 0.000 0.567 0.000 0.000 0.000 0.000 0.000 24.637 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/GPN-30 DASR was developed by the Air Force as part of a joint DoW/ FAA program to modernize and standardize ATC equipment in the National Airspace System. The DASR replaced aging, obsolete approach control radars and complies with joint DoW/FAA modernization program agreements. The DASR Tech Refresh Upgrade III efforts will implement Engineering Change Proposals (ECPs) developed by the Air Force /FAA that address urgent and critical obsolescence issues associated with DASR subassemblies (including Commercial Off-The-Shelf (COTS) interface and control assemblies) and closure of discrepancy items from DASR Tech Refresh Segment 2. The DASR Tech Refresh Upgrade III efforts will implement Engineering Change Proposals (ECPs) defined under cost element CB030 (Digital Airport Surveillance Radar (DASR)) of this budget. The nature of this consolidation creates an interdependency between CB030 and CB110. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB030 and /or CB110 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 52 of 81 P-1 Line #56 Volume 2 - 414 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 12 / CB110 DASR Tech Refresh Upgrade III Modification Type: Added Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB110 DASR Tech Refresh Upgrade III B Kits Recurring 2.1.1) DASR Tech Refresh Upgrade III - NonOrganic Subtotal: Recurring Subtotal: CB110 DASR Tech Refresh Upgrade III Subtotal: Procurement, All Modification Items 17 / 8.253 - / 8.253 9 / 4.788 - 17 / 8.253 / 4.788 - 9 / 4.788 2 / 1.078 - / - - / - - / - - / - - / - - / - - / - / 1.078 - / - - / - - / - - / - - / - - / - - / - 2 / 1.078 - / - - / - - / - - / - - / - - / - - / - - / / 0.000 - / / 0.000 28 / 14.119 / 14.119 - 28 / 14.119 - / 8.253 - / 4.788 - / 1.078 - / - - / - - / - - / - - / - - / - - / - 3.1) Integrated Logistics Support - / 0.742 - / 0.255 - / 0.242 - / - - / - - / - - / - - / - - / - - / - - / - - / 1.239 3.2) Production Engineering - / 1.305 - / 0.465 - / 0.469 - / - - / - - / - - / - - / - - / - - / - - / - - / 2.239 - / 2.047 - / 0.720 - / 0.711 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 3.478 Modification Item 1 of 1: CB110 DASR Tech Refresh Upgrade III - / 2.660 - / 1.450 - / 2.363 - / 0.567 / 0.000 - / 0.000 - / 7.040 Subtotal: Installation - / 2.660 - / 1.450 - / 2.363 - / 0.567 / - - / 0.000 - / 7.040 - / 14.119 - Support (All Modification Items) Subtotal: Support Installation - / 0.000 - / 0.567 / - - / 0.567 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 12.960 6.958 4.152 0.567 0.000 UNCLASSIFIED Page 53 of 81 0.567 0.000 0.000 P-1 Line #56 0.000 0.000 0.000 24.637 Volume 2 - 415 === page 496 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 12 / CB110 DASR Tech Refresh Upgrade III MDAP/MAIS Code: Modification Item 1 of 1: CB110 DASR Tech Refresh Upgrade III Manufacturer Information Manufacturer Name: RAYTHEON Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Mar 2025 Mar 2026 Delivery Dates Mar 2026 Mar 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Installation Team AIT:: Installation Name: DASR Tech Refresh Upgrade III Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 11 / 2.660 Prior Years 6 / 1.450 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 17 / 4.110 FY 2025 - / - - / - 9 / 2.363 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 2.363 FY 2026 - / - - / - - / - 2 / 0.567 0 / 0.000 2 / 0.567 - / - - / - - / - - / - 0 / 0.000 2 / 0.567 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.567 - / - - / - - / - - / - 0 / 0.000 Total 11 / 2.660 6 / 1.450 9 / 2.363 2 / 0.567 0 / 0.000 28 / 7.040 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 11 - 3 2 1 - 3 3 3 - 2 - - - - - - - - - - - - - - - - - - - 28 Out 11 - 3 2 1 - 3 3 3 - 2 - - - - - - - - - - - - - - - - - - - 28 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 54 of 81 P-1 Line #56 Volume 2 - 416 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 13 / CB120 TAS Tech Refresh Upgrade III MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 10.265 6.660 0.000 6.660 6.291 6.356 5.918 - - - - - - - - - 0.000 0.000 10.265 6.660 0.000 6.660 6.291 6.356 5.918 - - - - - - - - - 0.000 0.000 10.265 6.660 0.000 6.660 6.291 6.356 5.918 To FY 2031 Complete 6.057 Continuing - Continuing - 6.057 Continuing - Total - Continuing - - 6.057 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/FYC-22 Visual Information Display System (VIDS) is the Navy developed/owned system that meets the NAS Mod Tower Automation System (TAS) requirements. The Tower Automation System (TAS) COTS equipment is suffering from obsolescence and Information Assurance (IA) issues. The TAS Tech Refresh Upgrades will address these obsolescence and IA issues as well as maintain compatibility with the FAAs Next Generation (NextGen) Air Transportation System initiatives. The TAS will be upgraded to maintain interoperability and compliance with the FAA ATC systems. The inventory objective is 56. The TAS Tech Refresh Upgrade III efforts will implement Engineering Change Proposals (ECPs) defined under cost element CB040 (Tower Automation System (TAS)) of this budget. The nature of this consolidation creates an interdependency between CB040 and CB120 that addresses obsolescence and IA issues that render the current hardware and software unsupportable. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB040 and /or CB120 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. CB120 is a follow-on to CB100 (TAS Tech Refresh II) which completed procurements in FY 2024. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 55 of 81 P-1 Line #56 Volume 2 - 417 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 13 / CB120 TAS Tech Refresh Upgrade III MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: Added Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CB120 TAS Tech Refresh Upgrade III B Kits Recurring 2.1.1) TAS Tech Refresh Upgrade III - NonOrganic Subtotal: Recurring - (21) - Subtotal: CB120 TAS Tech Refresh Upgrade III Subtotal: Procurement, All Modification Items - / - - / - 12 / 9.000 / 0.000 - / - - / - - / - 12 / 9.000 / 0.000 - / - - / 9.000 / 9.000 3 / 2.280 - / - 3 / 2.280 / / - - / 2.280 - / - - / 2.280 - / 4.650 - / 3.955 - / 4.032 - / 4.113 - - 6 / 4.650 - 5 / 3.955 - 5 / 4.032 / 4.113 20 / 17.768 - - / 4.032 5 / 4.113 - 3 / 2.280 / 3.955 5 / 4.032 / 2.280 - / 4.650 5 / 3.955 3 / 2.280 - / 2.280 6 / 4.650 5 / 4.113 / 17.768 - 20 / 17.768 / 17.768 56 / 45.798 - / 45.798 56 / 45.798 - / 45.798 Support (All Modification Items) 3.1) Integrated Logistics Support - / - - / - - / 0.500 - / 0.080 - / - - / 0.080 - / 0.200 - / 0.136 - / 0.090 - / 0.100 Continuing Continuing 3.2) Production Engineering - / - - / - - / 0.765 - / 0.220 - / - - / 0.220 - / 0.400 - / 0.279 - / 0.106 - / 0.120 Continuing Continuing - / 0.000 - / - - / 1.265 - / 0.300 - / - - / 0.300 - / 0.600 - / 0.415 - / 0.196 - / 0.220 Continuing Continuing Modification Item 1 of 1: CB120 TAS Tech Refresh Upgrade III - / 0.000 / 0.000 - / 0.000 - / 4.080 / 0.000 - / 4.080 - / 1.041 - / 1.986 - / 1.690 - / 1.724 - / 9.215 - / 19.736 Subtotal: Installation - / 0.000 / - - / 4.080 / - - / 4.080 - / 1.041 - / 1.986 - / 1.690 - / 1.724 - / 9.215 - / 19.736 6.057 Continuing Subtotal: Support Installation - / - - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 0.000 10.265 6.660 0.000 UNCLASSIFIED Page 56 of 81 6.660 6.291 6.356 P-1 Line #56 5.918 Continuing Volume 2 - 418 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 13 / CB120 TAS Tech Refresh Upgrade III MDAP/MAIS Code: Modification Item 1 of 1: CB120 TAS Tech Refresh Upgrade III Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: TAS Tech Refresh Upgrade III Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 12 / 4.080 - / - - / - - / - - / - 0 / 0.000 12 / 4.080 FY 2027 - / - - / - - / - - / - - / - - / - 3 / 1.041 - / - - / - - / - 0 / 0.000 3 / 1.041 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 1.986 - / - - / - 0 / 0.000 6 / 1.986 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.690 - / - 0 / 0.000 5 / 1.690 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.724 0 / 0.000 5 / 1.724 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.759 5 / 1.759 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 7.456 20 / 7.456 Total - / - - / - - / - 5 / 1.724 25 / 9.215 56 / 19.736 Installation Cost 12 / 4.080 0 / 0.000 12 / 4.080 0 / 0.000 12 / 4.080 3 / 1.041 6 / 1.986 5 / 1.690 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 In - - - - - - - - - - 4 4 4 - - Out - - - - - - - - - - 4 4 4 - - FY 2029 Q3 Q4 Q1 3 - - - 3 - FY 2030 Q2 Q3 Q4 Q1 3 3 - - - 3 3 - FY 2031 Q2 Q3 Q4 Q1 2 3 - - - 2 3 - Q2 Q3 Q4 TC Tot 2 3 - 25 56 25 56 - 2 3 Footnotes: (21) The TAS Tech Refresh Upgrades address obsolescence and IA issues as well as maintain compatibility with the FAAs Next Generation (NextGen) Air Transportation System initiatives. The TAS Tech Refresh Upgrade efforts will implement Engineering Change Proposals (ECPs) defined under cost element CB040 (Tower Automation System (TAS)) of this budget. The nature of this consolidation creates an interdependency between CB040 and CB120. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB040 and /or CB120 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. CB120 (TAS Tech Refresh) III procurements which start in FY 2026 are a follow-on to CB100 (TAS Tech Refresh) II procurements. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 57 of 81 P-1 Line #56 Volume 2 - 419 === page 500 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 14 / CB130 DASR Tech Refresh Upgrade IV MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 6.225 6.639 0.000 6.639 4.573 5.901 6.945 - - - - - - - - - 0.000 0.000 6.225 6.639 0.000 6.639 4.573 5.901 6.945 - - - - - - - - - 0.000 0.000 6.225 6.639 0.000 6.639 4.573 5.901 6.945 To FY 2031 Complete 7.362 Continuing - Continuing - 7.362 Continuing - Total - Continuing - - 7.362 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/GPN-30 DASR was developed by the Air Force as part of a joint DoW / FAA program to modernize and standardize ATC equipment in the National Airspace System. The DASR replaced aging, obsolete approach control radars and complied with joint DoW/FAA modernization program agreements. The inventory objective is 28. The DASR Tech Refresh Upgrade efforts implement Engineering Change Proposals (ECPs) developed by the Air Force / FAA that address urgent and critical issues associated with DASR subassemblies (including Commercial Off-The-Shelf (COTS) interface and control assemblies). The DASR Tech Refresh Upgrade IV effort will implement Engineering Change Proposals (ECPs) defined under cost element CB030 (Digital Airport Surveillance Radar (DASR)) of this budget. The ECPs included in CB130 will address issues identified during the transition to the DASR Replacement being developed under the FAA Airport Surveillance Radar - Replacement (ASR-R) Program which is currently scheduled for FY 2023 through FY 2030. The nature of this consolidation creates an interdependency between CB030 and CB130. Both hardware and software for these two cost elements overlap requiring concurrent efforts. Delay or interruption to either CB030 and/or CB130 causes a break in fleet capability and negatively impacts both safety of flight and Air Traffic Controller workload. CB130 is a follow-on to CB110 (DASR Tech Refresh III) which will complete procurements in FY 2026. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 58 of 81 P-1 Line #56 Volume 2 - 420 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 14 / CB130 DASR Tech Refresh Upgrade IV Modification Type: Added Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB130 DASR Tech Refresh Upgrade IV B Kits Recurring 2.1.1) DASR Tech Refresh Upgrade IV - NonOrganic - (22) Subtotal: Recurring - Subtotal: CB130 DASR Tech Refresh Upgrade IV Subtotal: Procurement, All Modification Items - / - - / - 8 / 5.725 / 0.000 - / - / - - / - / 0.000 - / - - / 5.725 / 5.725 - 2 / 1.460 - / - 2 / 1.460 / / - - / 1.460 - / - - / 1.460 - / 2.978 - / 3.040 - / 3.875 - / 3.953 - - 4 / 2.978 - 4 / 3.040 - 5 / 3.875 / 3.953 - - - / 3.875 5 / 3.953 - 2 / 1.460 / 3.040 5 / 3.875 / 1.460 - / 2.978 4 / 3.040 2 / 1.460 - 8 / 5.725 / 1.460 4 / 2.978 / 0.000 - 5 / 3.953 / - - / / 0.000 28 / 21.031 - / 21.031 28 / 21.031 - / 21.031 Support (All Modification Items) 3.1) Logistics - / - - / - - / 0.080 - / 0.060 - / - - / 0.060 - / 0.070 - / 0.085 - / 0.135 - / 0.070 Continuing Continuing 3.2) Production Engineering - / - - / - - / 0.420 - / 0.311 - / - - / 0.311 - / 0.298 - / 0.268 - / 0.379 - / 0.080 Continuing Continuing - / 0.000 - / - - / 0.500 - / 0.371 - / - - / 0.371 - / 0.368 - / 0.353 - / 0.514 - / 0.150 Continuing Continuing Modification Item 1 of 1: CB130 DASR Tech Refresh Upgrade IV - / 0.000 / 0.000 - / 0.000 - / 4.808 / 0.000 - / 4.808 - / 1.227 - / 2.508 - / 2.556 - / 3.259 - / 3.324 - / 17.682 Subtotal: Installation - / 0.000 / - - / 4.808 / - - / 4.808 - / 1.227 - / 2.508 - / 2.556 - / 3.259 - / 3.324 - / 17.682 7.362 Continuing Subtotal: Support Installation - / - - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 0.000 6.225 6.639 0.000 UNCLASSIFIED Page 59 of 81 6.639 4.573 5.901 P-1 Line #56 6.945 Continuing Volume 2 - 421 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 14 / CB130 DASR Tech Refresh Upgrade IV MDAP/MAIS Code: Modification Item 1 of 1: CB130 DASR Tech Refresh Upgrade IV Manufacturer Information Manufacturer Name: Raytheon (via FAA Contract) Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: DASR Tech Refresh Upgrade IV Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 8 / 4.808 0 / 0.000 8 / 4.808 - / - - / - - / - - / - 0 / 0.000 8 / 4.808 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 1.227 - / - - / - - / - 0 / 0.000 2 / 1.227 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 2.508 - / - - / - 0 / 0.000 4 / 2.508 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.556 - / - 0 / 0.000 4 / 2.556 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.259 0 / 0.000 5 / 3.259 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.324 5 / 3.324 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - 8 / 4.808 Installation Cost 0 / 0.000 8 / 4.808 2 / 1.227 4 / 2.508 4 / 2.556 5 / 3.259 / - - 5 / 3.324 / - 28 / 17.682 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 4 4 - - - 2 - - 2 2 - - 2 2 - - 2 3 - 5 28 Out - - - - - - - - - - - - 5 28 - 4 4 - 2 - - 2 2 - - 2 2 - - 2 3 Footnotes: (22) As directed by the Federal Aviation Administration (FAA) Reauthorization Act of 2024 and the 2025 House of Representatives Committee on Transportation and Infrastructure Budget Reconciliation, the FAA has accelerated the modernization of their Air Traffic Control (ATC) Communications, Surveillance, and Automation Systems. These systems are Joint FAA-DoW programs. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 60 of 81 P-1 Line #56 Volume 2 - 422 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 15 / CB140 ATC Surveillance MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 6.947 0.000 6.947 3.836 13.718 13.254 11.601 24.382 73.738 Total - - - - - - - - - - - - 0.000 0.000 0.000 6.947 0.000 6.947 3.836 13.718 13.254 11.601 24.382 73.738 - - - - - - - - - - - - 0.000 0.000 0.000 6.947 0.000 6.947 3.836 13.718 13.254 11.601 24.382 73.738 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The ATC Surveillance capability provides terminal approach control services and is essential to Navy / Marine Corps aircraft safety-of-flight. The Monopulse Secondary Surveillance Radar (MSSR) Plot Extractor Assembly is at the end of its operational system life. The Plot Extractor-Receiver is no longer producible / repairable and will be replaced in all 28 DASR Systems. The Series 300 MK2 Interrogator RF Amp and Driver are obsolete. This funding will replace the MK2 with the MK3 Interrogator at eleven USN/MC Air Stations. This effort will also address other known end-of-life / end-of-repair parts issues. The USN/USMC has four Antenna Radomes that require upgrade / replacement. This effort will correct issues with the Zenith hatch, obstruction (Ob) lights, dome lamination separation, and sealant deterioration. The Navy/ Marine Corps inventory objective is 28. As directed by the Federal Aviation Administration (FAA) Reauthorization Act of 2024 and the 2025 House of Representatives Committee on Transportation and Infrastructure Budget Reconciliation, the FAA has accelerated the modernization of their Air Traffic Control (ATC) Communications, Surveillance, and Automation Systems. These systems are Joint DoW - FAA programs. In order for the Navy / Marine Corps to continue our participation in these programs, the funding in this Budget has been increased beginning in FY 2027. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 61 of 81 P-1 Line #56 Volume 2 - 423 === page 504 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 15 / CB140 ATC Surveillance FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CB140 ATC Surveillance B Kits Recurring 2.1.1) End Item (MSSR) - NonOrganic - / - - / - - / - 2 / 3.416 - / - 2 / 3.416 1 / 1.742 5 / 8.885 4 / 7.250 5 / 9.244 2.1.2) End Item (Radome) - NonOrganic - / - - / - - / - 3 / 1.350 - / - 3 / 1.350 1 / 0.459 - - - 2.1.3) End Item (MK3 Interrogator) - NonOrganic - / - - / - - / - 1 / 1.041 - / - 1 / 1.041 1 / 1.062 3 / 3.249 / 0.000 - / - - / - / - - / - - / - / 0.000 - / - - / - Subtotal: Recurring - Subtotal: CB140 ATC Surveillance Subtotal: Procurement, All Modification Items - / 5.807 - / - 6 / 5.807 - / - - / 5.807 - / - - / 5.807 - / 3.263 - - / 5.807 - 6 / 5.807 / 3.263 / 12.134 - 3 / 3.263 / - 4 / 4.419 / 12.134 / 11.669 - 8 / 12.134 - / - / 11.669 - 1 / 1.127 / 10.371 - 8 / 11.669 - 11 / 20.743 / - 6 / 10.371 / 10.371 - - 4 / 1.809 1 / 1.149 11 / 12.047 / 21.892 - 12 / 21.892 / 21.892 - 28 / 51.280 / - / 65.136 43 / 65.136 / 65.136 - Support (All Modification Items) 3.1) Integrated Logistics Support - / - - / - - / - - / 0.150 - / - - / 0.150 - / 0.077 - / 0.208 - / 0.204 - / 0.156 - / 0.318 - / 1.113 3.2) Production Engineering - / - - / - - / - - / 0.390 - / - - / 0.390 - / 0.190 - / 0.544 - / 0.533 - / 0.406 - / 0.828 - / 2.891 - / 0.000 - / - - / - - / 0.540 - / - - / 0.540 - / 0.267 - / 0.752 - / 0.737 - / 0.562 - / 1.146 - / 4.004 Modification Item 1 of 1: CB140 ATC Surveillance - / 0.000 / 0.000 - / 0.600 / 0.000 - / 0.600 - / 0.306 - / 0.832 - / 0.848 - / 0.668 - / 1.344 - / 4.598 Subtotal: Installation - / 0.000 / - - / 0.600 / - - / 0.600 - / 0.306 - / 0.832 - / 0.848 - / 0.668 - / 1.344 - / 4.598 Subtotal: Support Installation - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.000 0.000 0.000 6.947 0.000 UNCLASSIFIED Page 62 of 81 6.947 3.836 13.718 P-1 Line #56 13.254 11.601 24.382 73.738 Volume 2 - 424 === page 505 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / CB140 ATC Surveillance MDAP/MAIS Code: Modification Item 1 of 1: CB140 ATC Surveillance Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 3 FY 2025 FY 2026 FY 2027 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 FY 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Jun 2027 Jun 2029 Jun 2030 Jun 2031 FY 2029 FY 2030 FY 2031 Manufacturer Name: Radome Services Manufacturer Location: NPortsmouth NH Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 3 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Jun 2027 Jun 2029 Jun 2030 Jun 2031 FY 2030 FY 2031 Manufacturer Name: Raytheon Inc Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 3 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Delivery Dates Jun 2027 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: End Item (MSSR) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 2 / 0.200 0 / 0.000 2 / 0.200 - / - - / - - / - - / - 0 / 0.000 2 / 0.200 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.102 - / - - / - - / - 0 / 0.000 1 / 0.102 FY 2029 - / - - / - - / - - / - - / - - / - - / - 5 / 0.520 - / - - / - 0 / 0.000 5 / 0.520 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.424 - / - 0 / 0.000 4 / 0.424 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.541 0 / 0.000 5 / 0.541 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / 1.214 11 / 1.214 Total - / - - / - - / - 2 / 0.200 5 / 0.541 11 / 1.214 28 / 3.001 Installation Cost LI 2820 - Ashore ATC Equipment Navy 0 / 0.000 UNCLASSIFIED Page 63 of 81 2 / 0.200 1 / 0.102 5 / 0.520 P-1 Line #56 4 / 0.424 Volume 2 - 425 === page 506 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / CB140 ATC Surveillance MDAP/MAIS Code: Modification Item 1 of 1: CB140 ATC Surveillance Installation Information Method of Implementation: [none specified]:: Installation Name: End Item (MSSR) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 1 1 - - 1 - - - 2 3 - - 2 2 - - 2 3 - 11 28 Out - - - - - - - - - - - - 11 28 - 1 1 - - 1 - 2 3 - - 2 2 - - 2 3 Method of Implementation: [none specified]:: Installation Name: End Item (Radome) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 3 / 0.300 0 / 0.000 3 / 0.300 - / - - / - - / - - / - 0 / 0.000 3 / 0.300 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.102 - / - - / - - / - 0 / 0.000 1 / 0.102 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 3 / 0.300 1 / 0.102 - / - - / - - / - 0 / 0.000 Installation Cost 0 / 0.000 3 / 0.300 4 / 0.402 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 1 2 - - 1 - - - - - - - - - - - - - - - 4 Out - - - - - - - - - - - - - - - - - - - - - - - - 4 - 1 2 - - 1 Method of Implementation: AIT:: Installation Name: End Item (MK3 Interrogator) Installation Cost Prior Years LI 2820 - Ashore ATC Equipment Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - / - / - / - / - / - UNCLASSIFIED Page 64 of 81 / - / - / - P-1 Line #56 / - / - / - / - Volume 2 - 426 === page 507 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / CB140 ATC Surveillance MDAP/MAIS Code: Modification Item 1 of 1: CB140 ATC Surveillance Installation Information Method of Implementation: AIT:: Installation Name: End Item (MK3 Interrogator) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 1 / 0.100 0 / 0.000 1 / 0.100 - / - - / - - / - - / - 0 / 0.000 1 / 0.100 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.102 - / - - / - - / - 0 / 0.000 1 / 0.102 FY 2029 - / - - / - - / - - / - - / - - / - - / - 3 / 0.312 - / - - / - 0 / 0.000 3 / 0.312 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.424 - / - 0 / 0.000 4 / 0.424 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.127 0 / 0.000 1 / 0.127 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.130 1 / 0.130 Total - / - - / - - / - 1 / 0.100 1 / 0.127 1 / 0.130 11 / 1.195 Installation Cost 0 / 0.000 1 / 0.100 1 / 0.102 3 / 0.312 4 / 0.424 Installation Schedule FY 2025 FY 2026 FY 2027 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 In - - - - - - - - - - Out - - - - - - - - - - LI 2820 - Ashore ATC Equipment Navy FY 2028 Q2 Q3 Q4 Q1 1 - - - - - - 1 FY 2029 Q2 Q3 Q4 Q1 1 - - - - - - 1 UNCLASSIFIED Page 65 of 81 FY 2030 Q2 Q3 Q4 Q1 1 2 - - - 1 2 - FY 2031 Q2 Q3 Q4 Q1 2 2 - - - P-1 Line #56 2 2 - Q2 Q3 Q4 TC Tot 1 - - 1 11 - 1 11 - 1 Volume 2 - 427 === page 508 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH MDAP/MAIS Code: Prior Years 103.753 103.753 103.753 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 6.049 1.561 2.006 0.000 2.006 6.365 4.736 5.844 - - - - - - - - 6.049 1.561 2.006 0.000 2.006 6.365 4.736 5.844 - - - - - - - - 6.049 1.561 2.006 0.000 2.006 6.365 4.736 5.844 To FY 2031 Complete 6.374 Continuing - Continuing - 6.374 Continuing - Total - Continuing - - 6.374 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The PAR Commercial-off-the-shelf (AN/FPN-68A) Upgrade replaces obsolete PAR systems (AN/FPN-63), continuing fleet shore-based Precision Approach capability. PAR (AN/FPN-63) safety-related ECPs are required to sustain the existing systems until replacement with the AN/FPN-68A. Installation costs will be site specific due to state and EPA regulations that will be adhered to for each install. Those ECPs include, but are not limited to, the Maintenance Walkway, the Modulator Board Upgrade, the Antenna Upgrade, the Configuration Upgrade, the Turntable Upgrade, the Fiber Optic Inter-site System (FOIS), and the Angle Voltage Generator (AVG) Upgrade. The final AN/FPN-63 will be replaced with the AN/FPN-68A in FY 2028. The PAR Tech Refresh Upgrade, beginning in FY 2028 and replacing some components and updating others, will prevent further system degradation and ensure continued use in the foreseeable future and beyond. This upgrade will replace the equipment shelter, the Environmental Control Unit (ECU), update the baseline software, and implement ECPs, to include the heat exchanger fan replacement, low-voltage power supply replacement, and upgrade the Radar Frequency Generator (RFG). LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 66 of 81 P-1 Line #56 Volume 2 - 428 === page 509 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH MDAP/MAIS Code: Models of Systems Affected: Shore Sites Modification Type: Reliability Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: X1036 AN/FPN-63/68A PAR TECH REFRESH B Kits Recurring 1.1.1) X1036 - PAR Tech Refresh - NonOrganic (23) 29 / 64.609 1.1.2) X1036 PAR TR Upgrade - NonOrganic Subtotal: Recurring Subtotal: X1036 AN/FPN-63/68A PAR TECH REFRESH Subtotal: Procurement, All Modification Items - / - / 64.609 - - 29 / 64.609 - 1 / 3.000 - / - 1 / 0.000 - / - 1 / 0.000 - / - - / - - / - - / - - / - / 3.000 - / - - / - - / - - / - 1 / 3.000 - / - 1 / 0.000 - / - 1 / 0.000 - / - - / - - / - - / 64.609 - / 3.000 - / - - 6 / 5.106 - / 5.106 / - - 6 / 2.982 / 2.982 - 6 / 5.106 / - - 8 / 4.056 / 4.056 - 6 / 2.982 / - - 8 / 4.136 / 4.136 - 8 / 4.056 / - 3 / 1.791 / 1.791 - 8 / 4.136 3 / 1.791 / - - / 5.106 - / 2.982 - / 4.056 - / 4.136 - / 1.791 31 / 67.609 31 / 18.071 / 85.680 - 62 / 85.680 / 85.680 - Support (All Modification Items) 2.1) Integrated Logistics Support - / 1.771 - / 0.110 - / 0.114 - / 0.090 - / - - / 0.090 - / 0.100 - / 0.102 - / 0.104 - / 0.106 Continuing Continuing 2.2) Production Engineering - / 6.806 - / 0.480 - / 0.598 - / 0.310 - / - - / 0.310 - / 0.694 - / 0.452 - / 0.460 - / 0.468 Continuing Continuing 2.3) Quality Assurance - / 0.332 - / 0.047 - / 0.049 / - - / - / - - / 0.300 - / 8.909 - / 0.637 - / 0.761 - / 0.400 - / - - / 0.400 - / 1.094 - / 0.554 - / 0.564 - / 0.574 Continuing Continuing / 0.000 - / 1.606 - / 0.165 - / 1.200 - / 1.224 - / 1.664 - / 2.244 - / 41.550 / - - / 1.606 - / 0.165 - / 1.200 - / 1.224 - / 1.664 - / 2.244 - / 41.550 6.374 Continuing Subtotal: Support - - - / - - / - - / - - / - - / 0.728 Installation Modification Item 1 of 1: X1036 AN/FPN-63/68A PAR TECH REFRESH - / 30.235 - / 2.412 - / 0.800 - / 1.606 Subtotal: Installation - / 30.235 - / 2.412 - / 0.800 - / 1.606 - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 103.753 6.049 1.561 2.006 0.000 UNCLASSIFIED Page 67 of 81 2.006 6.365 4.736 P-1 Line #56 5.844 Continuing Volume 2 - 429 === page 510 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH MDAP/MAIS Code: Modification Item 1 of 1: X1036 AN/FPN-63/68A PAR TECH REFRESH Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: Van Nuys, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 13 Dates FY 2025 Contract Dates Dec 2024 Delivery Dates Jan 2026 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Alteration Installation Team:: Installation Name: X1036 - PAR Tech Refresh Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 27 / 30.235 Prior Years 2 / 2.412 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 29 / 32.647 FY 2025 - / - - / - 1 / 0.800 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.800 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 1.606 0 / 0.000 0 / 1.606 1 / 0.165 - / - - / - - / - 0 / 0.000 1 / 1.771 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.165 - / - - / - - / - 0 / 0.000 Total 27 / 30.235 2 / 2.412 1 / 0.800 0 / 1.606 0 / 0.000 0 / 1.606 / - - / - 31 / 35.218 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 27 - - 1 1 - 1 - - - - - - - 1 - - - - - - - - - - - - - - - 31 Out 27 - - 1 1 - 1 - - - - - - - 1 - - - - - - - - - - - - - - - 31 LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 68 of 81 P-1 Line #56 Volume 2 - 430 === page 511 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 16 / X1036 AN/FPN-63/68A PAR TECH REFRESH MDAP/MAIS Code: Modification Item 1 of 1: X1036 AN/FPN-63/68A PAR TECH REFRESH Installation Information Method of Implementation: [none specified]:: Installation Name: X1036 PAR TR Upgrade Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 1.200 - / - - / - 0 / 0.000 6 / 1.200 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.224 - / - 0 / 0.000 6 / 1.224 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 1.664 0 / 0.000 8 / 1.664 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 1.673 8 / 1.673 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.571 3 / 0.571 Total - / - - / - - / - - / - - / - - / - - / - 6 / 1.200 8 / 1.664 11 / 2.244 31 / 6.332 Installation Cost 6 / 1.224 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 2 2 2 - 2 2 2 - 2 3 3 11 31 Out - - - - - - - - - - - - - - - - - - 2 2 2 - 2 2 2 - 2 3 3 11 31 Footnotes: (23) The FY27 system is not being procured, but obtained from the US Army as their requirements have changed and the system is no longer needed by the Army. FY27 Install cost increase is required for advance planning (site preparation) for the FY28 Install. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 69 of 81 P-1 Line #56 Volume 2 - 431 === page 512 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 17 / X1037 Instrument Landing System Upgrade MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 43.922 4.308 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.230 Total - - - - - - - - - - - - 43.922 4.308 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.230 - - - - - - - - - - - - 43.922 4.308 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.230 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Instrument Landing System AN/GRN-33(V) is an automated self-contained system providing precision approach to the air station runways for ILS equipped aircraft reducing manpower required for ground personnel. The First Article unit will have a higher installation cost because of the additional infrastructure to maintain a test bed for NAWCAD Patuxent River. Site surveys are required to be conducted at least three years ahead of system installation to allow for infrastructure upgrades required to install the systems at the air stations. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 70 of 81 P-1 Line #56 Volume 2 - 432 === page 513 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 17 / X1037 Instrument Landing System Upgrade FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: X1037 Instrument Landing System Upgrade B Kits Recurring 1.1.1) Instrument Landing System Upgrades NonOrganic (24) Subtotal: Recurring 23 / 8.152 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 8.152 / 8.152 - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 8.152 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.152 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.1) Logistics - / 3.752 - / 0.396 - / - - / - - / - - / - - / - - / - - / - - / - 2.2) Production Engineering - / 8.772 - / 0.685 - / - - / - - / - - / - - / - - / - - / - - / - 2.4) Quality Assurance - / 0.324 - / 0.047 - / - - / - - / - - / - - / - - / - - / - - / - - / 12.848 - / 1.128 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 13.976 Modification Item 1 of 1: X1037 Instrument Landing System Upgrade - / 22.922 - / 3.180 / 0.000 - / 0.000 - / 26.102 Subtotal: Installation - / 22.922 - / 3.180 / - - / 0.000 - / 26.102 - Subtotal: X1037 Instrument Landing System Upgrade Subtotal: Procurement, All Modification Items / 0.000 - - / - / 8.152 23 / 8.152 / 0.000 - / 8.152 - / - - / 4.148 - / - - / 9.457 - / - - - Support (All Modification Items) Subtotal: Support / 0.371 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 43.922 4.308 0.000 0.000 0.000 UNCLASSIFIED Page 71 of 81 0.000 0.000 0.000 P-1 Line #56 0.000 0.000 0.000 48.230 Volume 2 - 433 === page 514 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 17 / X1037 Instrument Landing System Upgrade MDAP/MAIS Code: Modification Item 1 of 1: X1037 Instrument Landing System Upgrade Manufacturer Information Manufacturer Name: Selex ES Manufacturer Location: Overland Park, KS Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 13 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Alteration Installation Team (AIT):: Installation Name: Instrument Landing System Upgrades Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 19 / 22.922 23 / 26.102 Prior Years 4 / 3.180 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 3.180 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 19 / 22.922 23 / 26.102 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 19 - 1 1 2 - - - - - - - - - - - - - - - - - - - - - - - - - 23 Out 19 - 1 1 2 - - - - - - - - - - - - - - - - - - - - - - - - - 23 Footnotes: (24) Inventory objective is 23. Each site (airfield, air station, etc.) will have an independent installation cost base on existing site configurations. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 72 of 81 P-1 Line #56 Volume 2 - 434 === page 515 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 18 / X1044 Landing Systems Tech Refresh MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.709 0.717 0.733 0.748 0.000 0.748 0.763 0.778 0.795 - - - - - - - - - 0.709 0.717 0.733 0.748 0.000 0.748 0.763 0.778 0.795 - - - - - - - - - 0.709 0.717 0.733 0.748 0.000 0.748 0.763 0.778 0.795 To FY 2031 Complete 0.811 Continuing - Continuing - 0.811 Continuing - Total - Continuing - - 0.811 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Landing Systems Tech Refresh will maintain the Navy and Marine Corps self-contained Precision Landing capability at selected Air Stations, to meet fleet requirements for safe aircraft recovery. The AN/ FPN-68 Precision Approach Radar (PAR) and AN/GRN-33 Instrument Landing System (ILS) were developed to modernize and standardize Shore Landing Systems equipment which has enabled Navy/Marine Corps Air Stations to replace aging, obsolete equipment. This Tech Refresh effort includes Engineering Change Proposal (ECP) efforts that are directly related to the PAR and ILS. The ECPs will introduce new capabilities into the PAR and ILS. Those ECPs include, but are not limited to, replacing obsolete servers for the PAR, updating the width/height indicator for PAR, updating decimination rate for PAR, updating the Maintenance Personal Computer (MPC) and Radar Display System (RDS) for the PAR. PAR inventory objective is 30. ILS inventory objective is 23. The original procurements, installations and associated support costs for PAR were funded under X1036 and ILS were funded under X1037. Operational Capability Improvement Requests (OCIRs) are submitted under OPNAV Instruction 3721.5M NAVAL AIR TRAFFIC CONTROL AIR NAVIGATION AIDS AND LANDING SYSTEMS PROGRAM by Fleet Activities to establish a new requirement/capability. OCIRs provide for the procurement and / or modification of critically needed electronic systems / equipment at Navy / Marine Corps Air Traffic Control facilities worldwide. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 73 of 81 P-1 Line #56 Volume 2 - 435 === page 516 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 18 / X1044 Landing Systems Tech Refresh FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: X1044 Landing Systems Tech Refresh B Kits Recurring 1.1.1) ECP/OCIR - Organic (25) Subtotal: Recurring Subtotal: X1044 Landing Systems Tech Refresh Subtotal: Procurement, All Modification Items - / 0.709 - / 0.717 - / 0.733 - / 0.748 - / - - / 0.748 - / 0.763 - / 0.778 - / 0.795 - / 0.811 Continuing Continuing - / 0.709 - / 0.717 - / 0.733 - / 0.748 - / - - / 0.748 - / 0.763 - / 0.778 - / 0.795 - / 0.811 Continuing Continuing - / 0.709 - / 0.717 - / 0.733 - / 0.748 - / - - / 0.748 - / 0.763 - / 0.778 - / 0.795 - / 0.811 Continuing Continuing - / 0.709 - / 0.717 - / 0.733 - / 0.748 - / - - / 0.748 - / 0.763 - / 0.778 - / 0.795 - / 0.811 Continuing Continuing / - - / - Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - 0.811 Continuing - / - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 0.709 0.717 0.733 0.748 0.000 UNCLASSIFIED Page 74 of 81 0.748 0.763 0.778 P-1 Line #56 0.795 Continuing Volume 2 - 436 === page 517 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 18 / X1044 Landing Systems Tech Refresh MDAP/MAIS Code: Modification Item 1 of 1: X1044 Landing Systems Tech Refresh Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: Van Nuys, CA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 13 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: Selex ES Manufacturer Location: Overland Park, KS Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 13 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: NIWC PAC Manufacturer Location: San Diego, Ca Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 13 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: NAWC WOLF Manufacturer Location: St. Inigoes, NAS Patuxent River MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 13 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Footnotes: (25) Support and installation costs are included in the ECP/OCIR End Item. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 75 of 81 P-1 Line #56 Volume 2 - 437 === page 518 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 19 / X1043 TACAN Antenna Upgrade MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 85.049 10.653 9.028 8.291 0.000 8.291 11.286 11.130 11.768 - - - - - - - - - 85.049 10.653 9.028 8.291 0.000 8.291 11.286 11.130 11.768 - - - - - - - - - 85.049 10.653 9.028 8.291 0.000 8.291 11.286 11.130 11.768 To FY 2031 Complete 12.164 Continuing - Continuing - 12.164 Continuing - Total - Continuing - - 12.164 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The TACAN Antenna Upgrade program will provide ships and shore installations with a new antenna for TACAN systems. Justification: TACAN is a dated systems with multiple obsolete parts. Modernization of the TACAN antenna is required to reduce maintenance and improve life span in order to meet needs of the Fleet, and provide a stand-alone recovery system for small combatants of the JPALS program restructure. Multiple Engineering Change Proposals (ECP) will address obsolescence with the system. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 76 of 81 P-1 Line #56 Volume 2 - 438 === page 519 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 19 / X1043 TACAN Antenna Upgrade MDAP/MAIS Code: Models of Systems Affected: Shore Sites Modification Type: Modernization Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: X1043 TACAN Antenna Upgrade B Kits Recurring 1.1.1) TACAN Antenna Upgrade - NonOrganic (26) 163 / 42.894 1.1.2) TACAN Shore Antenna - NonOrganic Subtotal: Recurring Subtotal: X1043 TACAN Antenna Upgrade Subtotal: Procurement, All Modification Items - / - / 42.894 - 163 / 42.894 - 22 / 6.749 - 12 / 3.742 / / 6.749 22 / 6.749 - 12 / 3.837 / / 3.742 12 / 3.742 - - / - 12 / 3.837 / - - / - / 3.837 - / - - 12 / 3.837 - / - 12 / 3.837 - - / / 3.837 12 / 3.932 12 / 2.347 - / 6.279 24 / 6.279 12 / 4.031 10 / 1.860 - / 5.891 22 / 5.891 12 / 4.132 10 / 1.897 - / 6.029 22 / 6.029 12 / 4.235 8 / 4.069 10 / 1.972 - 265 / 77.621 10 / 1.733 / 6.207 - 22 / 6.207 / 5.802 18 / 5.802 / 42.894 - / 6.749 - / 3.742 - / 3.837 - / - - / 3.837 - / 6.279 - / 5.891 - / 6.029 - / 6.207 - / 5.802 52 / 9.809 - / 87.430 317 / 87.430 - / 87.430 Support (All Modification Items) 2.1) Logistics - / 4.449 - / 0.252 - / 0.567 - / 0.587 - / - - / 0.587 - / 0.747 - / 0.506 - / 0.647 - / 0.637 Continuing Continuing 2.2) Production Engineering - / 6.163 - / 0.952 - / 1.199 - / 1.142 - / - - / 1.142 - / 1.363 - / 1.340 - / 1.163 - / 1.127 Continuing Continuing 2.3) Quality Assurance - / 0.395 - / 0.042 - / 0.443 - / 0.452 - / - - / 0.452 - / 0.551 - / 0.400 - / 0.479 - / 0.479 Continuing Continuing - / 11.007 - / 1.246 - / 2.209 - / 2.181 - / - - / 2.181 - / 2.661 - / 2.246 - / 2.289 - / 2.243 Continuing Continuing Modification Item 1 of 1: X1043 TACAN Antenna Upgrade - / 31.148 - / 2.658 - / 3.077 - / 2.273 / 0.000 - / 2.273 - / 2.346 - / 2.993 - / 3.450 - / 3.714 - / 10.369 - / 62.028 Subtotal: Installation - / 31.148 - / 2.658 - / 3.077 - / 2.273 / - - / 2.273 - / 2.346 - / 2.993 - / 3.450 - / 3.714 - / 10.369 - / 62.028 Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 85.049 10.653 9.028 8.291 0.000 UNCLASSIFIED Page 77 of 81 8.291 11.286 11.130 P-1 Line #56 11.768 12.164 Continuing Continuing Volume 2 - 439 === page 520 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 19 / X1043 TACAN Antenna Upgrade MDAP/MAIS Code: Modification Item 1 of 1: X1043 TACAN Antenna Upgrade Manufacturer Information Manufacturer Name: THALES Manufacturer Location: Salt Lake City, UT (27) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 13 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 3031 Jan 2032 Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 15 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Mar 2029 Mar 2030 Mar 2031 Mar 2032 Installation Information Method of Implementation: AIT Installation:: Installation Name: TACAN Antenna Upgrade Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 144 / 31.148 19 / 2.658 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 163 / 33.806 22 / 3.077 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 22 / 3.077 12 / 2.273 - / - - / - - / - - / - 0 / 0.000 12 / 2.273 12 / 2.346 - / - - / - - / - 0 / 0.000 12 / 2.346 12 / 2.393 - / - - / - 0 / 0.000 12 / 2.393 12 / 2.450 - / - 0 / 0.000 12 / 2.450 12 / 2.514 0 / 0.000 12 / 2.514 12 / 2.600 FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 2.600 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 4.069 8 / 4.069 12 / 2.514 20 / 6.669 265 / 55.528 Total LI 2820 - Ashore ATC Equipment Navy 144 / 31.148 19 / 2.658 22 / 3.077 12 / 2.273 12 / 2.273 0 / 0.000 0 / 0.000 UNCLASSIFIED Page 78 of 81 12 / 2.273 12 / 2.346 12 / 2.393 P-1 Line #56 12 / 2.450 Volume 2 - 440 === page 521 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 19 / X1043 TACAN Antenna Upgrade MDAP/MAIS Code: Modification Item 1 of 1: X1043 TACAN Antenna Upgrade Installation Information Method of Implementation: AIT Installation:: Installation Name: TACAN Antenna Upgrade Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 144 - 7 6 6 - 8 7 7 - 4 5 3 - 4 5 3 - 4 5 3 - 4 5 3 - 4 4 4 20 265 Out 144 - 7 6 6 - 8 7 7 - 4 5 3 - 4 5 3 - 4 5 3 - 4 5 3 - 4 4 4 20 265 Method of Implementation: TBD:: Installation Name: TBD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 12 / 0.600 - / - - / - 0 / 0.000 12 / 0.600 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 1.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 1.200 0 / 1.000 10 / 2.200 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 1.300 10 / 1.300 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 1.400 10 / 1.400 Total - / - - / - - / - - / - - / - - / - - / - 10 / 1.200 20 / 3.700 52 / 6.500 Installation Cost 10 / 1.000 12 / 0.600 10 / 1.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - 6 6 - - 5 5 - - 5 5 20 52 Out - - - - - - - - - - - - - - - - - - - 6 6 - - 5 5 - - 5 5 20 52 Footnotes: (26) (27) X1043: Inventory objective is 317 MOOG was bought by THALES LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 79 of 81 P-1 Line #56 Volume 2 - 441 === page 522 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 20 / INACTIVE PROJECTS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 94.101 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 94.101 Total - - - - - - - - - - - - 94.101 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 94.101 - - - - - - - - - - - - 94.101 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 94.101 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Inactive Projects prior year totals. LI 2820 - Ashore ATC Equipment Navy UNCLASSIFIED Page 80 of 81 P-1 Line #56 Volume 2 - 442 === page 523 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2820 / Ashore ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Modification Number / Title: 20 / INACTIVE PROJECTS FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement 1.1.1) Inactive Projects - Organic (*) Subtotal: Procurement - / 94.101 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 94.101 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 94.101 / 0.000 - / 94.101 Installation Subtotal: Installation - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2820 - Ashore ATC Equipment Navy 94.101 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 81 of 81 0.000 0.000 0.000 P-1 Line #56 0.000 0.000 0.000 94.101 Volume 2 - 443 === page 524 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 444 === page 525 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 474.402 474.402 474.402 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 74.458 72.104 62.581 0.000 62.581 24.748 26.756 33.634 - - - - - - - - 74.458 72.104 62.581 0.000 62.581 24.748 26.756 33.634 - - - - - - - - 74.458 72.104 62.581 0.000 62.581 24.748 26.756 33.634 To FY 2031 Complete 55.925 Continuing - Continuing - 55.925 Continuing - Total - Continuing - - 55.925 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 9.164 - 0.929 - 0.929 8.400 19.232 24.245 - - 61.970 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: In FY 2016 and prior years, efforts for Shipboard Air Traffic Control (SATC) and Automatic Carrier Landing System (ACLS) were previously funded under BLIs OPN 2831 and OPN 2832, respectively. DESCRIPTION: Shipboard Air Traffic Control (SATC): SATC systems are responsible for safe and expeditious control of air traffic within 50 Nautical Miles of a ship. SATC systems include the air traffic surveillance radar (ASR), AN/SPN43 and the air traffic control processing and display system, AN/TPX-42A(V), which has two major configurations: AN/TPX-42A(V)15/16. The (V)16 configurations comprise of Carrier Air Traffic Control Center - Direct Altitude and Identity Readout (CATCC-DAIR), Amphibious Air Traffic Control Center - Direct Altitude and Identity Readout (AATCC-DAIR); (V)16 DAIR system is used with the AN/SPN-43 and Identification Friend or Foe (IFF) inputs to track and control aircraft. The second configuration, AN/TPX-42A(V)15 interfaces with next generation multipurpose radars and IFF to perform the same mission. Obsolescence problems are being addressed through various upgrades in a phased approach. The major upgrades include a series of AN/TPX-42A(V) modification kits requiring various combinations of OL-541processor re-host, track processor upgrade, OD-220 console, audio/video recorder, flat panel display, embedded trainer, and other components to bring the AN/TPX-42A(V)16 through execution of the Air Traffic Control Multifunction Console Engineering Change Proposal (ECP), to the AN/SYY-1 configuration. The nomenclature AN/SYY-1 more accurately reflects the system attributes as a (S) water (Surface Ship), (Y) data processing, (Y) surveillance and control system. The ASR capability provided by the AN/SPN-43 radar system is required for NIMITZ Class CVNs and LHA/LHD class ships until the capability is replaced by the AN/SPN-50 Shipboard Air Traffic Radar. Obsolescence problems are being addressed through various upgrades in a phased approach until replaced. Shipboard Air Traffic Radar (SATR) (AN/SPN-50(V)) The "National Defense Strategy of the United States of America" calls for military forces to assure allies and friends, dissuade potential adversaries, deter aggression and counter coercion, and defeat adversaries in order to accomplish our national objectives. The Shipboard Air Traffic Radar (SATR) AN/SPN-50(V) supports these objectives and will be the primary Air Traffic Control (ATC) surveillance radar onboard Nimitz Class Aircraft Carrier (CVN) and Amphibious (LHA and LHD) type ships. The launch and recovery of aircraft, to include ATC, is a primary function of aircraft carriers and amphibious landing platforms. The surveillance function provides weather and radar data to air traffic controllers supporting aviation operations of all Navy, Marine Corps, joint and allied aviation assets within the assigned airspace. This data is utilized by air traffic controllers to provide a variety of ATC services such as ATC radar approach and departure services, which includes aircraft separation, airspace monitoring, navigational assistance, emergency vectoring, traffic calls, and vectoring and sequencing to the final approach point. Reliable and accurate ATC surveillance radar enhances overall mission and training effectiveness, and safety for aircrews and aircraft alike. The AN/SPN-50(V) CDD was signed March 2015 and Milestone B was achieved September 2015 where the Milestone Decision Authority (MDA) designated the AN/SPN-50(V) Program as an ACAT IV(T). The AN/SPN-50(V) CPD was signed November 2018. Milestone C was achieved September 2020, and IOC was achieved 3rd quarter FY 2024. The AN/SPN-50(V) inventory objective is 25 systems (20 LRIP and 5 FRP). LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 1 of 26 P-1 Line #57 Volume 2 - 445 === page 526 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Radar Landing Systems (RLS): ACLS Mod Kits comprises three legacy systems (AN/SPN-46, AN/SPN-41, and AN/SPN-35C) that provide the primary and secondary precision electronic guidance for landing suitably equipped aircraft under all weather conditions on CVNs, LHA/LHD class ships, and selected Naval Air Stations. Many of the components in the system have been in service for more than thirty years. This program funds maintainability, reliability, modernization and supportability improvements to existing equipment components that can no longer be maintained, procured or supported, as well as items providing upgraded capability and improved operational relevance in more environments. Life Cycle Extension (LCE) sustainment efforts for ACLS systems will be completed to address obsolescence and supportability issues, leverage Commercial Off-The-Shelf (COTS) technology, address cyber-security updates and requirements, and support external system interface requirements. The LCE efforts by system are planned to be conducted in blocks, to address the most critical obsolescence, supportability, and emergent requirements first and to group remaining improvements into logical block upgrade packages that minimize multiple, duplicative repair efforts and reduce costs while delivering hardware in a time phased approach to meet ship maintenance availability schedules. This program includes a shore-based variant, installed at key airfields, that provides identical control signal indications (for pilot familiarization) as those provided by the afloat systems on board CVN vessels. In 2022, the Navy approved an updated Precision Approach and Landing Capability (PALC) Roadmap that planned to field system upgrades aimed at modernizing the AN/SPN-35 and AN/SPN-46 systems as well as inserting common sub-systems that minimize future sustainment costs. In 1QFY2025, the 2022 PALC Roadmap update was rescinded and the AN/SPN-51 development was halted. With no planned replacement system, it is essential to continue fielding Radar Landing System (RLS) mod kits that address subsystem obsolescence issues and extend the systems' life until a replacement system is identified. These mod kits support all three radar-based landing systems: AN/SPN-46 Automated Carrier Landing System (ACLS), AN/SPN-41 Instrument Carrier Landing System (ICLS), and AN/SPN-35 Precision Approach Radar (PAR). The life cycle extension and obsolescence modification kit approach aligns with the guidance provided in the original 2013 PALC Roadmap that identified system service life requirements until 2040. AN/SPN-46 Automatic Carrier Landing System (ACLS) is a Precision Approach Landing System (PALS) on board CVN class ships that provides aircraft position information to the Final Control Workstation in Carrier Air Traffic Control Center (CATCC) and provides the pilot with the capability of selecting a fully automatic, instrument landing, or talk down approach. Aircraft communications are available to aircraft equipped with the AN/APN-245 Beacon (or a successor system). The AN/SPN-46 system is certified to provide the carrier with an all-weather flight operational capability. Initial Operational Capability (IOC) of the AN/SPN-46 was in 1985, and the system has exceeded its design life. There are significant obsolescence issues. AN/SPN-46 Block IV upgrade is designed to correct known obsolescence issues in the antenna pedestal, modulator/transmitter, and various Circuit Card Assemblies (CCAs). If this effort is not accomplished, replacement parts will not be available to support the system, thereby, negatively affecting Operational Availability (Ao) and safety of flight on the aircraft carrier. Similarly, AN/SPN-46 Block V upgrades address obsolete equipment hardware and software, specifically processor CCAs, Real Time Operating System (RTOS), and radar software. These installations are required to sustain the systems aboard ships until 2040. Without these collective upgrades, system Operational Availability (Ao) and aircraft safety of flight will be significantly, negatively affected. AN/SPN-41 Instrument Carrier Landing System (ICLS) transmitting set provides all weather instrument approach guidance from the ship to the aircraft equipped with AN/ARA-63 Receiver Group (or a successor system). It is a secondary precision electronic landing system and safety of flight back up to provide azimuth and elevation alignment information to suitably equipped aircraft aboard CVN and LHA/LHD class ships. Initial Operational Capability (IOC) of the AN/SPN-41 was in 1970 and the system has exceeded its design life. AN/SPN-41 LCE upgrades previously include the Transmitter, Coder Monitor, Electronics Drawer, and Radome hardware to ensure continued operational availability and extended service life of the AN/SPN-41. Current and future upgrades include a AN/SPN-41 Solid State Transmitter, that replaces legacy magnetron transmitters responsible for degraded system reliability, as well as various modification kit upgrades, that address obsolescence in the equipment operating systems and their associated subsystems. The AN/SPN-41 systems on LHA/LHD class ships have been placed in an "Inactive Equipment Maintenance (IEM)" status and will be removed, as needed, to maintain the AN/SPN-41 capability on CVN class ships until 2040. AN/SPN-35C is the Precision Approach Radar aboard LHA/LHD class ships and is used for Mode III aircraft recovery, which ensures the safe approach and landing of fixed and rotary wing aircraft during adverse weather and night conditions. Original AN/SPN-35 equipment was built and installed in the 1960s and Initial Operational Capability (IOC) of the AN/SPN-35C was in 2004. The AN/SPN-35C Block II addressed modernization of the legacy AN/SPN-35C with the development of Active Electronic Scanned Array (AESA) equipment, that also addressed obsolescence and operational limitations of the existing receiver-transmitter, pedestal, antenna group, and stabilization subsystem. The 2022 PALC Roadmap update directed realignment of this upgrade to the AN/SPN-51 Brizo Landing System. With the subsequent LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 2 of 26 P-1 Line #57 Volume 2 - 446 === page 527 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A cancellation of AN/SPN-51 Brizo Landing System development efforts, sub-system Life-Cycle Extension upgrades are being pursued to extend overall system service life to 2040. Without the development and fielding of sub-system upgrades, system Ao and aircraft safety of flight will be significantly, negatively affected. Procurement, installations and associated support costs with these efforts prior to FY 2017 were funded under BLI 2832. Installing Agent: Shipyards and Alteration Installation Teams. When installation to be made: Selected Restricted Availability (SRA) / Restricted Availability (RAV). Ships or facilities to receive the equipment: CVNs, LHA/LHD class ships, Software Support Activity (NAWCAD, St Inigoes, MD) and various selected shore and training sites. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 3 of 26 P-1 Line #57 Volume 2 - 447 === page 528 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) (Modernization) - / 65.185 - / 7.488 - / 10.435 - / 5.712 - / 0.000 - / 5.712 P-3a 2 / AN/SPN-50(V) (TBD) - / 175.898 - / 57.701 - / 44.281 - / 39.643 - / 0.000 - / 39.643 P-3a 3 / ACLS MOD KITS SUMMARY PN408 (Modernization) - / 110.172 - / 7.413 - / 16.436 - / 16.255 - / 0.000 - / 16.255 P-3a 4 / AN/SPN-46 Block IV (PN420) (TBD) - / 79.211 - / 1.856 - / 0.952 - / 0.971 - / 0.000 - / 0.971 P-3a 6 / INACTIVE PROJECTS (TBD) - / 43.936 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 474.402 - / 74.458 - / 72.104 - / 62.581 - / 0.000 - / 62.581 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) (Modernization) - / 3.792 - / 3.481 - / 3.560 - / 3.642 Continuing Continuing P-3a 2 / AN/SPN-50(V) (TBD) - / 9.047 - / 9.219 - / 17.076 - / 40.716 Continuing Continuing P-3a 3 / ACLS MOD KITS SUMMARY PN408 (Modernization) - / 10.919 - / 14.056 - / 12.998 - / 11.567 Continuing Continuing P-3a 4 / AN/SPN-46 Block IV (PN420) (TBD) - / 0.990 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 83.980 P-3a 6 / INACTIVE PROJECTS (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 43.936 P-40 Total Gross/Weapon System Cost - / 24.748 - / 26.756 - / 33.634 - / 55.925 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds baseline programs to provide Automatic Carrier Landing System (ACLS), Shipboard Air Traffic Control (SATC), and Shipboard Air Traffic Radar (SATR) systems. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 4 of 26 P-1 Line #57 Volume 2 - 448 === page 529 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 65.185 7.488 10.435 5.712 0.000 5.712 3.792 3.481 3.560 - - - - - - - - - 65.185 7.488 10.435 5.712 0.000 5.712 3.792 3.481 3.560 - - - - - - - - - 65.185 7.488 10.435 5.712 0.000 5.712 3.792 3.481 3.560 To FY 2031 Complete 3.642 Continuing - Continuing - 3.642 Continuing - Total - Continuing - - 3.642 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This equipment and installation costs on this P-3a are for individual modification programs. This exhibit summarizes procurement and installation for Cost Codes MP054, MP056, MP057, MP058, and MP059. Line item Engineering Changes to Correct Deficiencies captures unanticipated emergent engineering changes. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 5 of 26 P-1 Line #57 Volume 2 - 449 === page 530 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) MDAP/MAIS Code: Models of Systems Affected: CVNs, LHA/LHD class ships Prior Years Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) B Kits Recurring 1.1.1) (MP058) TPX-42 Multi-Function Console NonOrganic (1) 19 / 25.147 2 / 2.771 4 / 5.653 15 / 4.480 6 / 1.748 - 1.1.2) (MP059) TPX-42 ECP Upgrades - NonOrganic 1.1.3) SYY-1 ECP Upgrades - NonOrganic 1.1.4) Inactive Projects - Organic - (2) (3) Subtotal: Recurring Subtotal: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) Subtotal: Procurement, All Modification Items / - 67 / 13.583 / 43.210 - - 101 / 43.210 - / / / 4.519 8 / 4.519 - / - - / - 6 / 1.783 - / - - - 6 / 1.899 - - - / / / 7.436 - 10 / 7.436 - / - / - - / - / - 6 / 1.899 / - - / - / 1.899 - / - 6 / 1.899 - / - - / - - / - 6 / 1.855 / / 1.899 - - 6 / 1.899 / - - / - 6 / 1.892 / / 1.855 - - 6 / 1.855 / - - / - 6 / 1.930 / / 1.892 - - 6 / 1.892 / - - / - 6 / 1.945 / / 1.930 - - 6 / 1.930 - / - - / - 27 / 8.011 18 / 5.631 48 / 15.152 / / 1.945 6 / 1.945 - / / 5.631 18 / 5.631 / 43.210 - / 4.519 - / 7.436 - / 1.899 - / - - / 1.899 - / 1.855 - / 1.892 - / 1.930 - / 1.945 - / 5.631 25 / 33.571 67 / 13.583 - / 70.317 167 / 70.317 - / 70.317 Support (All Modification Items) 2.1) Engineering Changes to Correct Deficiencies - / 4.332 - / 0.541 - / 0.551 - / 0.561 - / - - / 0.561 - / 0.571 - / 0.340 - / 0.346 - / 0.361 Continuing Continuing 2.2) Integrated Logistics Support - / 2.369 - / 0.318 - / 0.324 - / 0.262 - / - - / 0.262 - / 0.235 - / 0.139 - / 0.144 - / 0.161 Continuing Continuing 2.3) Production Engineering - / 2.277 - / 0.306 - / 0.312 - / 0.250 - / - - / 0.250 - / 0.223 - / 0.184 - / 0.190 - / 0.210 Continuing Continuing 2.4) Quality Assurance - / 0.422 - / 0.056 - / 0.057 - / 0.057 - / - - / 0.057 - / 0.058 - / 0.059 - / 0.060 - / 0.075 Continuing Continuing - / 9.400 - / 1.221 - / 1.244 - / 1.130 - / - - / 1.130 - / 1.087 - / 0.722 - / 0.740 - / 0.807 Continuing Continuing / 0.000 - / 2.683 - / 0.850 - / 0.867 - / 0.890 - / 0.890 - / 6.631 - / 28.889 / - - / 2.683 - / 0.850 - / 0.867 - / 0.890 - / 0.890 - / 6.631 - / 28.889 3.642 Continuing Subtotal: Support Installation Modification Item 1 of 1: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) - / 12.575 - / 1.748 - / 1.755 - / 2.683 Subtotal: Installation - / 12.575 - / 1.748 - / 1.755 - / 2.683 - Total Total Cost (Procurement + Support + Installation) LI 2830 - Afloat ATC Equipment Navy 65.185 7.488 10.435 5.712 0.000 UNCLASSIFIED Page 6 of 26 5.712 3.792 3.481 P-1 Line #57 3.560 Continuing Volume 2 - 450 === page 531 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) MDAP/MAIS Code: Modification Item 1 of 1: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) Manufacturer Information Manufacturer Name: NAWCAD Manufacturer Location: Patuxent River, MD Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 6 Dates FY 2025 Contract Dates Apr 2025 Delivery Dates Oct 2025 FY 2026 FY 2027 FY 2028 Manufacturer Name: NAWCAD FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: St. Inigoes, MD Administrative Leadtime (in Months): 6 Dates FY 2029 Production Leadtime (in Months): 9 FY 2025 FY 2026 Contract Dates Mar 2025 Mar 2026 Delivery Dates Dec 2025 Dec 2026 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: AIT:: Installation Name: (MP058) TPX-42 Multi-Function Console Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 17 / 10.606 2 / 1.310 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 19 / 11.916 FY 2025 - / - - / - 2 / 1.315 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.315 FY 2026 - / - - / - - / - 4 / 2.683 0 / 0.000 4 / 2.683 - / - - / - - / - - / - 0 / 0.000 4 / 2.683 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.683 - / - - / - - / - - / - 0 / 0.000 Total LI 2830 - Afloat ATC Equipment Navy 17 / 10.606 2 / 1.310 2 / 1.315 4 / 2.683 0 / 0.000 UNCLASSIFIED Page 7 of 26 P-1 Line #57 25 / 15.914 Volume 2 - 451 === page 532 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) MDAP/MAIS Code: Modification Item 1 of 1: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) Installation Information Method of Implementation: AIT:: Installation Name: (MP058) TPX-42 Multi-Function Console Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 17 - - 1 1 - - 1 1 - - 2 2 - - - - - - - - - - - - - - - - - 25 Out 17 - - 1 1 - - 1 1 - - 2 2 - - - - - - - - - - - - - - - - - 25 Method of Implementation: AIT:: Installation Name: (MP059) TPX-42 ECP Upgrades Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 1.969 FY 2025 15 / 1.969 - / - 6 / 0.438 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.438 FY 2026 - / - - / - 6 / 0.440 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.440 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.440 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 15 / 1.969 6 / 0.438 27 / 2.847 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 15 - - 3 3 - - 3 3 - - - - - - - - - - - - - - - - - - - - - 27 Out 15 - - 3 3 - - 3 3 - - - - - - - - - - - - - - - - - - - - - 27 LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 8 of 26 P-1 Line #57 Volume 2 - 452 === page 533 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) MDAP/MAIS Code: Modification Item 1 of 1: SATC Modernization Kit Summary (MP054, MP056, MP057, MP058, MP059) Installation Information Method of Implementation: Field Change Install Team:: Installation Name: SYY-1 ECP Upgrades Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 6 / 0.850 - / - - / - - / - 0 / 0.000 6 / 0.850 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 0.867 - / - - / - 0 / 0.000 6 / 0.867 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.890 - / - 0 / 0.000 6 / 0.890 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.890 0 / 0.000 6 / 0.890 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.000 6 / 1.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 5.631 18 / 5.631 Total - / - - / - - / - - / - - / - - / - 6 / 0.850 6 / 0.890 24 / 6.631 48 / 10.128 Installation Cost 6 / 0.867 6 / 0.890 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - 6 - - - 6 - - - 6 - - - 6 - 24 48 Out - - - - - - - - - - - - - - - 6 - - - 6 - - - 6 - - - 6 - 24 48 Method of Implementation (Organic): Inactive Projects - Not Installed Installation Quantity: 67 Footnotes: (1) MP058 TPX-42 Multi-Function Console: Inventory Objective is 25. The Multi-Function Console (MFC) provides a common human interface for all ATC workstations that includes complete upgrades of software and hardware to support new radar sensors that will reduce operational costs and improve reliability. Many of the other items in this P-3a are Engineering Change Proposals to resolve obsolescence issues. One system consists of OD/225 controller consoles, OL/822 racks and OX-85 Recorder and power distribution racks. The OL/822 and OX-85 are common between CVNs and LHD/LHAs, OD/225s however vary between the type of ship, there are 5 OD/225s on CVNs and 8 OD/225s on LHA/Ds. (2) MP059 TPX-42 ECP Upgrades. (2) (3) FY 2027 SYY-1 upgrades are required to address obsolete Unit 3A2 kickbox assembly. Inactive projects prior year totals (install costs included) LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 9 of 26 P-1 Line #57 Volume 2 - 453 === page 534 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / AN/SPN-50(V) MDAP/MAIS Code: Prior Years 175.898 175.898 175.898 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 57.701 44.281 39.643 0.000 39.643 9.047 9.219 17.076 - - - - - - - - 57.701 44.281 39.643 0.000 39.643 9.047 9.219 17.076 - - - - - - - - 57.701 44.281 39.643 0.000 39.643 9.047 9.219 17.076 To FY 2031 Complete 40.716 Continuing - Continuing - 40.716 Continuing - Total - Continuing - - 40.716 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Shipboard Air Traffic Radar (SATR) AN/SPN-50(V) The "National Defense Strategy of the United States of America" calls for military forces to assure allies and friends, dissuade potential adversaries, deter aggression and counter coercion, and defeat adversaries in order to accomplish our national objectives. The Shipboard Air Traffic Radar (SATR) AN/SPN-50(V) (hereinafter referred to as AN/SPN-50(V)) supports these objectives and will be the primary Air Traffic Control (ATC) surveillance radar onboard Nimitz Class Aircraft Carrier (CVN) and Amphibious (LHA and LHD (LH)) type ships. The launch and recovery of aircraft, to include ATC, is a primary function of aircraft carriers and amphibious landing platforms. The surveillance function provides weather and radar data to air traffic controllers supporting aviation operations of all Navy, Marine Corps, joint and allied aviation assets within the assigned airspace. This data is utilized by air traffic controllers to provide a variety of ATC services such as ATC radar approach and departure services (which includes aircraft separation), airspace monitoring, navigational assistance, emergency vectoring, traffic calls, and vectoring and sequencing to the final approach point. Reliable and accurate ATC surveillance radar enhances overall mission and training effectiveness and safety for aircrews and aircraft alike. The AN/SPN-50(V) Capability Development Document was signed March 2015 and Milestone B was achieved September 2015, at which time the Milestone Decision Authority (MDA) designated the AN/SPN-50(V) program as an ACAT IV(T). Milestone C was achieved September 2020, and IOC was achieved 3rd quarter FY 2024. The AN/SPN-50(V) inventory objective is 25 systems (20 LRIP and 5 FRP): 21 OPN and 4 SCN. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 10 of 26 P-1 Line #57 Volume 2 - 454 === page 535 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SPN-50(V) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/SPN-50(V) B Kits Recurring 1.1.1) AN/SPN-50(V)1 - NonOrganic 1.1.2) AN/SPN-50(V)2 - NonOrganic 9 / 108.443 (4) 1.1.3) AN/SPN-50(V)3 - NonOrganic 1.1.4) Engineering Changes to Correct Deficiencies Organic - (5) Subtotal: Recurring Subtotal: Procurement, All Modification Items - 3 / 38.147 / - - / - - / - - / - / 5.834 - / - - / - / 114.277 / 38.147 - 9 / 114.277 - / - / - / 114.277 - Subtotal: AN/SPN-50(V) - - / 38.147 / 26.965 - 3 / 38.147 - - 2 / 26.965 / 26.965 - / - - / - / - - / - / 3.764 - / - - / 18.696 - / - 1 / 18.696 - / - / 18.696 - / - - 2 / 26.965 - / - 1 / 14.932 - / - - / - - / - - / - - / - - / - 9 / 108.443 1 / 14.932 - - / - - / - - / - - / - - / - 6 / 80.044 - / - - / - - / / 3.764 - / 0.500 - / 1.500 / 18.696 - / 0.500 - / 1.500 1 / 18.696 - / 0.500 - / 1.500 / 18.696 - / 0.500 - / 1.500 - - 1 / 13.500 - / - / 13.500 - 2 / 27.440 - / 13.500 - 6 / 82.940 / 1.925 Continuing Continuing / 29.365 Continuing Continuing 2 / 29.365 Continuing Continuing / 29.365 Continuing Continuing - 1 / 13.500 3 / 42.000 - Support (All Modification Items) 2.1) Integrated Logistics Support - / 15.486 - / 4.865 - / 2.727 - / 1.887 - / - - / 1.887 - / 1.387 - / 1.418 - / 0.069 - / 1.651 Continuing Continuing 2.2) Production Engineering - / 28.363 - / 5.411 - / 3.950 - / 3.245 - / - - / 3.245 - / 1.272 - / 6.301 - / 0.199 - / 1.453 Continuing Continuing - / 43.849 / 10.276 - / 6.677 - / 5.132 - / - - / 5.132 - / 2.659 - / 7.719 - / 0.268 - / 3.104 Continuing Continuing Modification Item 1 of 1: AN/SPN-50(V) - / 17.772 - / 9.278 - / 10.639 - / 15.815 - / 0.000 - / 3.308 - / 8.247 - / 21.000 - / 91.947 Subtotal: Installation - / 17.772 - / 9.278 - / 10.639 - / 15.815 / - - / 3.308 - / 8.247 - / 21.000 - / 91.947 Subtotal: Support - Installation - / 0.000 - / 15.815 - / 5.888 / - - / 15.815 - / 5.888 - - Total Total Cost (Procurement + Support + Installation) LI 2830 - Afloat ATC Equipment Navy 175.898 57.701 44.281 39.643 0.000 UNCLASSIFIED Page 11 of 26 39.643 9.047 9.219 P-1 Line #57 17.076 40.716 Continuing Continuing Volume 2 - 455 === page 536 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SPN-50(V) MDAP/MAIS Code: Modification Item 1 of 1: AN/SPN-50(V) Manufacturer Information Manufacturer Name: Saab Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 17 Dates FY 2025 FY 2026 FY 2027 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Feb 2027 FY 2028 FY 2029 Feb 2030 Feb 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2031 Jul 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPN-50(V)1 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 4 / 17.772 9 / 29.374 Prior Years 3 / 6.426 2 / 5.176 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 5.176 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 4 / 17.772 3 / 6.426 9 / 29.374 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 1 1 - 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - 9 Out 4 1 1 - 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - 9 Method of Implementation: [none specified]:: Installation Name: AN/SPN-50(V)2 Installation Cost Prior Years LI 2830 - Afloat ATC Equipment Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - / - / - / - / - / - UNCLASSIFIED Page 12 of 26 / - / - / - P-1 Line #57 / - / - / - / - Volume 2 - 456 === page 537 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SPN-50(V) MDAP/MAIS Code: Modification Item 1 of 1: AN/SPN-50(V) Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPN-50(V)2 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - 0 / 2.852 1 / 2.554 2 / 7.730 0 / 0.000 2 / 7.730 - / - - / - - / - - / - 0 / 0.000 3 / 13.136 FY 2026 - / - - / - 0 / 2.909 2 / 7.730 0 / 0.000 2 / 7.730 - / - - / - - / - - / - 0 / 0.000 2 / 10.639 FY 2027 - / - - / - - / - 0 / 0.355 0 / 0.000 0 / 0.355 1 / 5.888 - / - - / - - / - 0 / 0.000 1 / 6.243 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 0 / 2.852 1 / 5.888 - / - - / - - / - 0 / 0.000 1 / 5.463 4 / 15.815 0 / 0.000 4 / 15.815 6 / 30.018 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 1 - 1 1 - 2 - - - 1 - - - - - - - - - - - - - 6 Out - - - - - - - 1 - 1 1 - 2 - - - 1 - - - - - - - - - - - - - 6 Method of Implementation: [none specified]:: Installation Name: AN/SPN-50(V)3 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 3.308 1 / 8.247 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 9.000 2 / 9.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 12.000 2 / 12.000 Total - / - - / - - / - - / - - / - - / - - / - - / - 0 / 3.308 1 / 8.247 4 / 21.000 5 / 32.555 Installation Cost LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 13 of 26 P-1 Line #57 0 / 0.000 1 / 11.555 Volume 2 - 457 === page 538 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/SPN-50(V) MDAP/MAIS Code: Modification Item 1 of 1: AN/SPN-50(V) Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPN-50(V)3 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 4 5 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 4 5 Footnotes: (4) FY27 quantities decreased due to OEM no longer able to produce the (V)2 due to parts obsolescence. FY27 install costs increase is due to increased material costs, installations taking longer, and availability planned for the west coast. The AN/SPN-50(V)2 is a modification to the AN/SPN-50(V)1 configuration to meet electrical requirements and address shock deficiencies. (5) FY27 funding increase to support Engineering Changes to Correct Deficiencies for the following ECPs. Maintenance Assistant Modules (MAM) Kits ($1M), Control and Maintenance Console (CMC) Obsolescence ($1M), Software Version 1.2.5 Package ($1M), and Antenna Control Unit (ACU) Controller Redesign and ACU Sinus Drive Redesign ($.8M). LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 14 of 26 P-1 Line #57 Volume 2 - 458 === page 539 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 MDAP/MAIS Code: Prior Years 110.172 110.172 110.172 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.413 16.436 16.255 0.000 16.255 10.919 14.056 12.998 - - - - - - - - 7.413 16.436 16.255 0.000 16.255 10.919 14.056 12.998 - - - - - - - - 7.413 16.436 16.255 0.000 16.255 10.919 14.056 12.998 To FY 2031 Complete 11.567 Continuing - Continuing - 11.567 Continuing - Total - Continuing - - 11.567 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The equipment and installation costs on this P-3a are for individual modification programs for AN/SPN-35/41/46 and FRN-49 systems. Funding has also been provided for upgrades addressing broadened cybersecurity requirements to remain compliant with software cyber-security directives and Information Assurance mandates. Line item "Engineering Changes to Correct Deficiencies" captures anticipated emergent engineering changes. PMA213 configuration control board approves inventory objectives. Contract and Delivery dates are various. The variance in install costs from year to year is due to the makeup of the different equipment being installed each year, the different hull types receiving modifications, and the different Design Services Allocation (DSA) and install costs from different locations depending on where modifications are performed. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 15 of 26 P-1 Line #57 Volume 2 - 459 === page 540 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 MDAP/MAIS Code: Models of Systems Affected: CVNs, LHA/LHD class ship, and selected shore sites Prior Years Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: ACLS MOD KITS SUMMARY PN408 B Kits Non-Recurring 63 / 14.965 2 / 0.454 52 / 15.840 - / - 1 / 3.526 - / - 1.1.15) AN/SPN-41 Solid State Transmitter (SST) NonOrganic 60 / 6.925 4 / 0.714 - 1.1.16) AN/SPN-46 CCA (Blk V, Phase I) - NonOrganic 10 / 1.491 3 / 0.465 1.1.17) PMA213D-068 (Brizo Phase 1) - NonOrganic 3 / 1.050 - / - 39 / 19.887 - / - 1.1.2) AN/SPN-46 COTS Refresh - NonOrganic (6) 1.1.3) AN/SPN-46 Obsolescence - NonOrganic 1.1.13) AN/SPN-35/41 COTS Refresh - NonOrganic 1.1.18) Inactive Projects - Organic (7) (8) Subtotal: Non-Recurring / 63.684 - Subtotal: ACLS MOD KITS SUMMARY PN408 Subtotal: Procurement, All Modification Items - / 1.633 - 228 / 63.684 9 / 1.633 11 / 2.992 - / - - / - - 7 / 1.391 / - - / - - 5 / 1.030 - / - 5 / 1.030 - / - - / - - 3 / 0.474 2 / 0.322 - / - 3 / 1.232 1 / 0.419 - / - - - / - - / - 12 / 2.424 - 7 / 1.391 / - / / 7.122 29 / 7.122 / - - 17 / 2.176 / - 10 / 2.100 / - - 12 / 1.572 / - - 12 / 2.568 - / - 1 / 679.320 52 / 15.840 6 / 1.332 53 / 693.608 - / - - / - - / - 64 / 7.639 - 18 / 2.752 - / - / - - / - - / - 2 / 0.856 3 / 1.308 3 / 1.332 - / - - / - 15 / 6.197 - - - - - / - - / - 39 / 19.887 - / - - - / - 15 / 3.162 / 3.162 / 5.098 - 29 / 5.098 / - / - 6 / 1.308 1 / 0.419 / 3.162 - - Continuing 2 / 0.322 / - / - / - Continuing / - / - - 17 / 2.261 - 15 / 3.162 - 17 / 2.142 / / 6.052 - 32 / 6.052 / / 4.212 - 21 / 4.212 / 3.593 Continuing Continuing 23 / 3.593 Continuing Continuing - / 63.684 - / 1.633 - / 7.122 - / 3.162 - / - - / 3.162 - / 5.098 - / 6.052 - / 4.212 - / 3.593 Continuing Continuing Support (All Modification Items) 2.1) Engineering Changes to Correct Deficiencies ECO SPN-46 - / 4.169 - / 1.416 - / 1.750 - / 1.785 - / - - / 1.785 - / 0.831 - / 0.848 - / 0.865 - / 1.383 Continuing Continuing 2.2) Engineering Changes to Correct Deficiencies ECO - / 6.670 - / 1.150 - / 1.367 - / 1.394 - / - - / 1.394 - / 0.902 - / 0.920 - / 0.938 - / 1.137 Continuing Continuing (9) SPN-35/41 (10) 2.3) Integrated Logistics Support 2.4) Production Engineering - (11) 2.5) Quality Assurance 2.6) Acceptance, Test and Evaluation / 4.366 - / 0.567 - / 1.471 - / 1.500 - / - - / 1.500 - / 0.660 - / 0.673 - / 0.686 - / 0.700 Continuing Continuing / 12.847 - / 0.998 - / 2.623 - / 2.675 - / - - / 2.675 - / 0.907 - / 1.252 - / 1.207 - / 1.359 Continuing Continuing - / 1.428 - / 0.204 - / 0.208 / - - / - / - Continuing Continuing - / 0.221 / - - / 1.205 - / 1.229 - / - - / 1.229 - / 0.365 - / 0.372 - / 0.380 - / 0.388 - / - - / 8.583 - / 3.665 - / 4.065 - / 4.076 - / 4.967 Continuing Continuing / 0.000 - / 4.510 - / 2.156 - / 3.939 - / 4.710 - / 3.007 - / 5.355 - / 42.599 / - - / 4.510 - / 2.156 - / 3.939 - / 4.710 - / 3.007 - / 5.355 - / 42.599 - (12) (13) Subtotal: Support - - - / 29.701 - / 4.335 - / 8.624 - / 8.583 Modification Item 1 of 1: ACLS MOD KITS SUMMARY PN408 - / 16.787 - / 1.445 - / 0.690 - / 4.510 Subtotal: Installation - / 16.787 - / 1.445 - / 0.690 - / 4.510 - / - - / - - / - - / - - - / - - / 4.160 Installation - Total LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 16 of 26 P-1 Line #57 Volume 2 - 460 === page 541 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CVNs, LHA/LHD class ship, and selected shore sites Prior Years Financial Plan Total Cost (Procurement + Support + Installation) LI 2830 - Afloat ATC Equipment Navy Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 110.172 7.413 16.436 16.255 0.000 UNCLASSIFIED Page 17 of 26 16.255 10.919 14.056 P-1 Line #57 12.998 11.567 Continuing Continuing Volume 2 - 461 === page 542 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 MDAP/MAIS Code: Modification Item 1 of 1: ACLS MOD KITS SUMMARY PN408 Manufacturer Information Manufacturer Name: NAWCAD Manufacturer Location: Patuxent River, MD (14) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 FY 2031 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: ACLS Mod Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 111 / 15.231 15 / 1.295 - 126 / 16.526 Prior Years / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - 5 / 0.613 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 0.613 FY 2026 - / - - / - - / - 26 / 3.874 - / - - / - - / - - / - 0 / 0.000 26 / 3.874 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 1.940 FY 2028 - / - - / - - / - - / - - / - - / - - / - 27 / 3.497 - / - - / - 0 / 0.000 27 / 3.497 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 29 / 4.035 - / - 0 / 0.000 29 / 4.035 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 2.317 0 / 0.000 18 / 2.317 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 2.742 23 / 2.742 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.001 1 / 2.001 18 / 2.317 24 / 4.743 269 / 37.545 Total 111 / 15.231 15 / 1.295 26 / 3.874 5 / 0.613 0 / 0.000 26 / 3.874 0 / 0.000 14 / 1.940 26 / 3.874 14 / 1.940 27 / 3.497 29 / 4.035 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 111 - - 7 8 - 2 2 1 3 6 9 8 2 2 6 4 2 7 9 9 8 8 8 5 2 6 6 4 24 269 Out 111 - - 7 8 - 2 2 1 3 6 9 8 2 2 6 4 2 7 9 9 8 8 8 5 2 6 6 4 24 269 Method of Implementation: [none specified]:: Installation Name: AN/SPN-41 Solid State Transmitter (SST) Installation Cost Prior Years LI 2830 - Afloat ATC Equipment Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 52 / 1.556 8 / 0.150 - - - - - - - - 0 / 0.000 60 / 1.706 / - / - / - UNCLASSIFIED Page 18 of 26 / - / - / - P-1 Line #57 / - / - Volume 2 - 462 === page 543 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 MDAP/MAIS Code: Modification Item 1 of 1: ACLS MOD KITS SUMMARY PN408 Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPN-41 Solid State Transmitter (SST) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - 4 / 0.077 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 0.077 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.077 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost Total 52 / 1.556 8 / 0.150 64 / 1.783 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 52 2 2 2 2 2 2 - - - - - - - - - - - - - - - - - - - - - - - 64 Out 52 2 2 2 2 2 2 - - - - - - - - - - - - - - - - - - - - - - - 64 Method of Implementation: AIT (Alteration Installation Team):: Installation Name: PMA213D-068 (Brizo Phase 1) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.612 3 / 0.612 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 3 / 0.636 0 / 0.000 3 / 0.636 - / - - / - - / - - / - 0 / 0.000 3 / 0.636 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.216 - / - - / - - / - 0 / 0.000 1 / 0.216 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 0.442 - / - - / - 0 / 0.000 2 / 0.442 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.675 - / - 0 / 0.000 3 / 0.675 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.690 0 / 0.000 3 / 0.690 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 3 / 0.636 Installation Cost LI 2830 - Afloat ATC Equipment Navy 0 / 0.000 UNCLASSIFIED Page 19 of 26 3 / 0.636 1 / 0.216 2 / 0.442 P-1 Line #57 3 / 0.675 3 / 0.690 / - 3 / 0.612 - / - 15 / 3.271 Volume 2 - 463 === page 544 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / ACLS MOD KITS SUMMARY PN408 MDAP/MAIS Code: Modification Item 1 of 1: ACLS MOD KITS SUMMARY PN408 Installation Information Method of Implementation: AIT (Alteration Installation Team):: Installation Name: PMA213D-068 (Brizo Phase 1) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - 2 1 - - 1 - - - 2 - - - 2 1 - - 2 1 3 15 Out - - - - - - - - - - - 2 1 - - 1 - - - 2 - - - 2 1 - - 2 1 3 15 Method of Implementation (Organic): Inactive Projects - Not Installed Installation Quantity: 39 Footnotes: (6) FY 2027 quantity and cost per unit decrease are due to fewer installs and a shift from higher cost embedded trainer upgrades to less expensive power supply and minor circuit card revisions. Year to year variance in kit costs are expected due to the mix of equipment procurements. Each CVN ship requires different upgrades at different times. Individual ship upgrades availabilities are every 2-3 years. (7) FY 2027 total costs reduction due to fewer ships availabilities. Year to year variance in kit costs are expected due to the mix of equipment procurements. Each CVN ship requires different upgrades at different times. Individual ship upgrades availabilities are every 2-3 years. (8) (9) Inactive Projects prior year totals (includes install costs). Continued engineering change support to all AN/SPN-46 mod kits is required through the FYDP. (10) (11) (12) (13) Continued engineering change support to all AN/SPN-35/41 mod kits is required through the FYDP. FY 2027 funds logistics support package documentation for critical AN/SPN-35/41/46 mod kits. Continued support package efforts required for successful introduction of modifications to the fleet. FY 2027 funding required for continued production engineering/design work required for emerging RLS mod kits through the FYDP. Year to year variance of Acceptance Test & Evaluation is expected and driven by the introduction of new system modifications and/or the location of system test events (e.g. East Coast, West Coast, or shipboard). (14) The variance in install costs from year to year is due to the makeup of the different equipment being installed each year, the different hull types receiving modifications, and the different Design Services Allocation (DSA) and install costs from different locations depending on where modifications are performed. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 20 of 26 P-1 Line #57 Volume 2 - 464 === page 545 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / AN/SPN-46 Block IV (PN420) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 79.211 1.856 0.952 0.971 0.000 0.971 0.990 0.000 0.000 0.000 0.000 83.980 Total - - - - - - - - - - - - 79.211 1.856 0.952 0.971 0.000 0.971 0.990 0.000 0.000 0.000 0.000 83.980 - - - - - - - - - - - - 79.211 1.856 0.952 0.971 0.000 0.971 0.990 0.000 0.000 0.000 0.000 83.980 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The AN/SPN-46 Block IV Precision Approach Landing System (PALS) Block IV upgrade is designed to correct known obsolescence issues in the antenna pedestal, modulator/transmitter, and various Circuit Card Assemblies (CCAs). Block IV upgrades to CCAs (ACIO and 2500 CCAs) are required for continued system operability. Antenna pedestal and modulator/transmitter upgrades were designed to extend the supportability of the AN/SPN-46, currently operating beyond its design life. Without these efforts, replacement parts will not be available to support the fielded AN/SPN-46 systems, thereby, negatively affecting Operational Availability (Ao) and safety of flight. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 21 of 26 P-1 Line #57 Volume 2 - 465 === page 546 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CVNs and selected shore sites Prior Years Financial Plan Modification Number / Title: 4 / AN/SPN-46 Block IV (PN420) Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: AN/SPN-46 Block IV (PN420) B Kits Recurring 1.1.1) AN/SPN-46 Block IV: Power Supply/Circuit Card Kit - NonOrganic 15 / 5.087 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 5.087 1.1.2) AN/SPN-46 Block IV: Pedestal/Transmitter - 12 / 34.836 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 34.836 NonOrganic (15) Subtotal: Recurring / 39.923 - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / 39.923 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 39.923 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.1) Integrated Logistics Support - / 10.016 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.2) Production Engineering - / 13.375 - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: AN/SPN-46 Block IV (PN420) Subtotal: Procurement, All Modification Items - / 0.000 - / - / 39.923 - 27 / 39.923 / 0.000 - / 39.923 - / - - / 10.016 - / - - - Support (All Modification Items) / 13.375 2.3) Quality Assurance - / 1.833 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2.4) Acceptance Test and Evaluation - / 1.321 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 26.545 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 26.545 Modification Item 1 of 1: AN/SPN-46 Block IV (PN420) - / 12.743 - / 1.856 - / 0.952 - / 0.971 / 0.000 - / 0.000 - / 17.512 Subtotal: Installation - / 12.743 - / 1.856 - / 0.952 - / 0.971 / - - / 0.000 - / 17.512 Subtotal: Support / 1.833 / 1.321 Installation - / 0.000 - / 0.971 - / 0.990 / - - / 0.971 - / 0.990 - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2830 - Afloat ATC Equipment Navy 79.211 1.856 0.952 0.971 0.000 UNCLASSIFIED Page 22 of 26 0.971 0.990 0.000 P-1 Line #57 0.000 0.000 0.000 83.980 Volume 2 - 466 === page 547 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SPN-46 Block IV (PN420) MDAP/MAIS Code: Modification Item 1 of 1: AN/SPN-46 Block IV (PN420) Manufacturer Information Manufacturer Name: Sierra Nevada Corporation Manufacturer Location: Sierra, Nevada Administrative Leadtime (in Months): 4 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: Sierra Nevada Corporation Manufacturer Location: Sierra, Nevada Administrative Leadtime (in Months): 7 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: Method:: Installation Name: AN/SPN-46 Block IV: Power Supply/Circuit Card Kit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 13 / 5.601 15 / 6.523 Prior Years 2 / 0.922 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.922 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 13 / 5.601 15 / 6.523 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 13 - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - 15 Out 13 - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - 15 LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 23 of 26 P-1 Line #57 Volume 2 - 467 === page 548 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / AN/SPN-46 Block IV (PN420) MDAP/MAIS Code: Modification Item 1 of 1: AN/SPN-46 Block IV (PN420) Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPN-46 Block IV: Pedestal/Transmitter Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 8 / 7.142 1 / 0.934 1 / 0.952 1 / 0.971 0 / 0.000 1 / 0.971 1 / 0.990 - / - - / - - / - 0 / 0.000 12 / 10.989 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 8 / 7.142 1 / 0.990 - / - - / - - / - 0 / 0.000 Installation Cost 1 / 0.934 1 / 0.952 1 / 0.971 0 / 0.000 1 / 0.971 12 / 10.989 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 8 - - 1 - - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - - 12 Out 8 - - 1 - - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - - 12 Footnotes: (15) System installation plan changes due to prior year equipment production delays and CVN availability schedule changes. Revised shipboard equipment installation plan aligns to latest shipyard CNO availabilities. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 24 of 26 P-1 Line #57 Volume 2 - 468 === page 549 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / INACTIVE PROJECTS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 43.936 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 43.936 Total - - - - - - - - - - - - 43.936 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 43.936 - - - - - - - - - - - - 43.936 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 43.936 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Inactive projects prior year totals. LI 2830 - Afloat ATC Equipment Navy UNCLASSIFIED Page 25 of 26 P-1 Line #57 Volume 2 - 469 === page 550 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2830 / Afloat ATC Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Modification Number / Title: 6 / INACTIVE PROJECTS FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement (*) 1.1.1) INACTIVE PROJECTS - Organic Subtotal: Procurement - / 43.936 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 43.936 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 43.936 / 0.000 - / 43.936 Installation Subtotal: Installation - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2830 - Afloat ATC Equipment Navy 43.936 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 26 of 26 0.000 0.000 0.000 P-1 Line #57 0.000 0.000 0.000 43.936 Volume 2 - 470 === page 551 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2851 / ID Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604777N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 551.221 551.221 551.221 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 59.602 52.171 35.620 0.000 35.620 56.266 54.808 51.295 - - - - - - - - 59.602 52.171 35.620 0.000 35.620 56.266 54.808 51.295 - - - - - - - - 59.602 52.171 35.620 0.000 35.620 56.266 54.808 51.295 To FY 2031 Complete 52.329 Continuing - Continuing - 52.329 Continuing - Total - Continuing - - 52.329 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Identification Systems program funds procurements and Engineering Change Proposals (ECPs) to address obsolescence and fact of life changes, installations, and certifications for the following Mark XII / Mark XIIA systems: AN/UPX-37, AN/UPX-41, AN/UPX-45 and AN/UPX-50 Digital Interrogators (DIs), AN/APX-118 and AN/APX-123 Common Digital Transponders (CXPs), AN/UPX-29 Interrogator System (comprised of Interrogator Set AN/UPX-24 or AN/UPX-49, OE-120/ UPX Antenna Group, and Mark XII or Mark XIIA equipment), AN/UPX-29 Modernization (UPneXt/Common Core), AN/UPX-46 Interrogator System (comprised of CP-2819/UPX Processor and Mark XIIA equipment), Identification Friend or Foe (IFF) support equipment, and AN/UPX-34A Radar Track Discriminator System (RTDS). The Air Traffic Control Radar Beacon System, IFF, Mark XII/XIIA System (AIMS) is a Department of War directed tri-service program designed to provide a universal air traffic control radar beacon system compatible with the National Airspace System program. It provides a secure identification system for military use on all combatant ships, selected auxiliaries, patrol craft, and selected Coast Guard ships by allowing all friendly forces to identify each other and neutral forces. The Mark XII/XIIA system supports several missions such as anti-air warfare, aerial bombardment, and naval attack. The OE-120/UPX antenna radiates Identification Friend or Foe (IFF) encoded Radio Frequency (RF) challenge pulses into space and receives the resultant IFF encoded RF transponder replies from space. Current surface ship OE-120()/UPX antenna systems will receive upgrade kits to improve system R&M. The upgrade kits will use open architecture and current technology that allows for continued production and future growth. An Engineering Change Proposal was awarded using RDT&E (PU 0676) funds for the Original Equipment Manufacturer to deliver an Engineering Design Model for shipboard test and evaluation in FY 2018. Modernization of the DDG 1000 Zumwalt Class IFF Sensor Suite includes procurement activities, product improvements, and engineering changes for three Electronically Scanned Array (ESA) antennas, one UPX-42(C) Interrogator, and three RT-1912(C)/APX Transponders. LI 2851 - ID Systems Navy UNCLASSIFIED Page 1 of 37 P-1 Line #58 Volume 2 - 471 === page 552 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2851 / ID Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604777N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Mark XII/ Mark XIIA Common Digital Transponder (MT032) (Reliability) - / 68.728 - / 0.531 - / 0.547 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / AN/UPX 24 (V) Mode S (MT035) (Capability Improvement) - / 98.265 - / 9.497 - / 6.574 - / 6.493 - / 0.000 - / 6.493 P-3a 3 / Mark XII Mode 5 (MT037) (Capability Improvement) - / 181.689 - / 0.781 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 4 / Mode S Digital Interrogator (MT040) (Capability Improvement) - / 91.910 - / 11.682 - / 8.483 - / 7.670 - / 0.000 - / 7.670 P-3a 5 / OE-120/UPX Antenna (MT041) (Reliability) - / 38.401 - / 11.985 - / 14.639 - / 9.098 - / 0.000 - / 9.098 P-3a 6 / AN/UPX-46 Processor System (MT042) (Reliability) - / 45.789 - / 11.425 - / 10.061 - / 6.701 - / 0.000 - / 6.701 P-3a 7 / Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) (Reliability) - / 8.158 - / 3.336 - / 3.761 - / 0.804 - / 0.000 - / 0.804 P-3a 8 / AN/UPX-36 Replacement (MT044) (Reliability) - / 15.481 - / 9.565 - / 6.298 - / 1.338 - / 0.000 - / 1.338 P-3a 9 / DDG 1000 Modernization (MT045) (Modernization) - / 2.800 - / 0.800 - / 0.380 - / 0.000 - / 0.000 - / 0.000 P-3a 10 / UPneXt (MT046) (TBD) - / 0.000 - / 0.000 - / 1.428 - / 3.516 - / 0.000 - / 3.516 P-40 Total Gross/Weapon System Cost / 551.221 - / 59.602 - / 52.171 - / 35.620 - / 0.000 - / 35.620 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Mark XII/ Mark XIIA Common Digital Transponder (MT032) (Reliability) - / 0.569 - / 0.580 - / 0.590 - / 0.600 - / 0.610 - / 72.755 P-3a 2 / AN/UPX 24 (V) Mode S (MT035) (Capability Improvement) - / 6.373 - / 3.513 - / 1.744 - / 7.776 - / 0.000 - / 140.235 P-3a 3 / Mark XII Mode 5 (MT037) (Capability Improvement) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 182.470 P-3a 4 / Mode S Digital Interrogator (MT040) (Capability Improvement) - / 8.751 - / 13.866 - / 10.652 - / 12.573 Continuing Continuing P-3a 5 / OE-120/UPX Antenna (MT041) (Reliability) - / 18.686 - / 18.247 - / 19.244 - / 14.139 - - P-3a 6 / AN/UPX-46 Processor System (MT042) (Reliability) - / 11.993 - / 8.095 - / 8.168 - / 7.064 Continuing Continuing P-3a 7 / Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) (Reliability) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 16.059 P-3a 8 / AN/UPX-36 Replacement (MT044) (Reliability) - / 0.528 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 33.210 P-3a 9 / DDG 1000 Modernization (MT045) (Modernization) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 3.980 P-3a 10 / UPneXt (MT046) (TBD) - / 9.366 - / 10.507 - / 10.897 - / 10.177 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 56.266 - / 54.808 - / 51.295 - / 52.329 Continuing Continuing / 20.203 / 164.642 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: LI 2851 - ID Systems Navy UNCLASSIFIED Page 2 of 37 P-1 Line #58 Volume 2 - 472 === page 553 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2851 / ID Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604777N Line Item MDAP/MAIS Code: N/A The purpose of the AN/UPX-41(C) Digital Interrogators (DI) and AN/APX-123 Common Digital Transponder (CXP) program is to replace 20-25 year old hardware and software (HW/SW) with reliability and maintenance enhancements through the use of Commercial off the Shelf / Non Developmental Item (COTS/NDI) form/fit/function improvements. Incorporation of the Mark XIIA (Mode 5) capability occurred in FY 2008 and changes nomenclatures from AN/UPX-37 and AN/APX-118(V) to AN/UPX-41(C) and AN/APX-123(V), respectively. Incorporation of the Mark XIIA (Mode S) capability into the AN/UPX-41(C) DI is currently ongoing and will change the DI nomenclature from AN/UPX-41(C) to AN/UPX-45(C). AN/UPX-24(V) Field Changes will provide hardware updates to accommodate Mode 5 and Mode S functionality in fielded systems. AN/UPX-24(V) Mode S upgrades will provide improved shipboard combat identification by increasing the probability of identification of commercial and neutral aircraft. The AN/UPX-29(V) Interrogator System is deployed on high capability, state of the art surface platforms that require IFF operational performance beyond that provided by a standard Mark XII system for combat identification. Mark XIIA Mode 5 and Mode S provide improved secure cooperative combat identification throughout IFF. Mode 5 and Mode S are product improvements designed to be installed through engineering changes to digital Mark XII interrogators and transponders including AN/APX-118/123(V), AN/UPX-37/41(C), and AN/UPX-24(V). AN/UPX-29 Modernization (UPneXt) is required to address obsolescence with respect to the CP 1273/AN/UPX-24(V) Processor Controller, and associated system components and interfaces, with consideration for software architecture, hardware modernization (size, weight and power) network hardening and cyber security. AN/UPX-46 field changes will provide hardware updates to IFF Interrogator/Transponder Systems fielded on LCS 1 and LCS 2 ship class variants, and United States Coast Guard (USCG) ship classes which are currently equipped with AN/UPX-29A or AN/UPX-37 (with Target Data Extractor) interrogator system configurations and Mark XII transponder systems. The hardware updates will reduce unique IFF configurations by installing common hardware with Mark XIIA capability. AN/UPX-34A Radar Track Discriminator System (RTDS) field changes will provide hardware and software upgrades to fielded systems that will increase system performance and incorporate "other service" target libraries into the system's target database. The RTDS is a Non-Cooperative Target Recognition (NCTR) system. OE-120/UPX kits provide hardware and software upgrades to 40-year old fielded systems to improve system Reliability and Maintainability (R&M) by replacing obsolete assemblies and units. The OE-120/UPX kits use open architecture and current technology that allows for continued production and future growth. AN/UPX-36 replacement will install AN/UPX-46 Interrogator Systems on the twelve ships in the LSD 41 and LSD 49 ship classes. The replacement program will reduce unique IFF Interrogator Systems by installing common hardware configurations with Mark XIIA capability. The DDG 1000 Zumwalt Class IFF Sensor Suite requires modernization, through product improvements and engineering changes, in order to implement product support elements, mitigate obsolescence, and incorporate cyber resiliency. LI 2851 - ID Systems Navy UNCLASSIFIED Page 3 of 37 P-1 Line #58 Volume 2 - 473 === page 554 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Mark XII/ Mark XIIA Common Digital Transponder (MT032) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 68.728 0.531 0.547 0.000 0.000 0.000 0.569 0.580 0.590 0.600 0.610 72.755 Total - - - - - - - - - - - - 68.728 0.531 0.547 0.000 0.000 0.000 0.569 0.580 0.590 0.600 0.610 72.755 - - - - - - - - - - - - 68.728 0.531 0.547 0.000 0.000 0.000 0.569 0.580 0.590 0.600 0.610 72.755 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Current Mark XII transponder systems no longer meet operational reliability and maintainability (R&M) requirements due to use beyond their intended life cycle and they suffer a high cost of ownership due to parts obsolescence. Current surface ship Mark XII transponders will be replaced to continue incremental digital and R&M upgrades to the Mark XII IFF system. The common digital transponder uses an open architecture that allows for future growth, including Mode 5 (AN/APX-123(V)) and Mode S which was incorporated into the production line beginning with the FY 2005 procurement. Inventory Objective of 581 is derived from the Naval Data Environment (NDE) database, the Ships & Aircraft Supplemental Data Table (SASDT) and ship/submarine Ship Program Manager (SPM) procurement plans and schedules. Incorporation of the Mark XIIA (Mode 5) capability occurred in FY08 and changed the nomenclature from AN/APX-118(V) to AN/APX-123(V). LRIP AN/APX-123(V) units were installed and operated in legacyonly modes until successful completion of the Mode 5 OPEVAL (MT037) and Full Rate Production decision. Full Rate Production was approved July 2012. LI 2851 - ID Systems Navy UNCLASSIFIED Page 4 of 37 P-1 Line #58 Volume 2 - 474 === page 555 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/APX-118/AN/ APX-123(V) Prior Years Financial Plan Modification Number / Title: 1 / Mark XII/ Mark XIIA Common Digital Transponder (MT032) Related RDT&E PEs: 0604777N Modification Type: Reliability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Mark XII/ Mark XIIA Common Digital Transponder (MT032) B Kits Recurring 1.1.1) Equipment - NonOrganic (1) Subtotal: Recurring Subtotal: Mark XII/ Mark XIIA Common Digital Transponder (MT032) Subtotal: Procurement, All Modification Items 531 / 27.756 / 27.756 - 531 / 27.756 / 27.756 - 10 / 0.531 / 0.531 - 10 / 0.531 / 0.531 - 10 / 0.547 - / - - / - - / - 10 / 0.569 / 0.547 - / - - / - - / - - 10 / 0.547 - / - - / - - / - 10 / 0.569 / 0.547 - / - - / - - / - - - - / 0.569 / 0.569 10 / 0.580 / 0.580 - 10 / 0.580 / 0.580 - 10 / 0.590 / 0.590 - 10 / 0.590 / 0.590 - 10 / 0.600 / 0.600 - 10 / 0.600 / 0.600 - 10 / 0.610 / 0.610 - 10 / 0.610 / 0.610 - 601 / 31.783 / 31.783 - 601 / 31.783 / 31.783 - Support (All Modification Items) 2.1) ILS 2.2) PE - / 3.008 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 17.184 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.008 / 17.184 2.3) Product Improvement - / 4.632 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.632 2.4) Acceptance, Test & Evaluation - / 2.834 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.834 2.5) Depot - / 0.010 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.010 2.6) Initial Training - / 0.822 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 28.490 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 28.490 Modification Item 1 of 1: Mark XII/ Mark XIIA Common Digital Transponder (MT032) - / 12.482 / 0.000 - / 0.000 - / 12.482 Subtotal: Installation - / 12.482 / - - / 0.000 - / 12.482 Subtotal: Support / 0.822 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 68.728 0.531 0.547 0.000 0.000 UNCLASSIFIED Page 5 of 37 0.000 0.569 0.580 P-1 Line #58 0.590 0.600 0.610 72.755 Volume 2 - 475 === page 556 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Mark XII/ Mark XIIA Common Digital Transponder (MT032) MDAP/MAIS Code: Modification Item 1 of 1: Mark XII/ Mark XIIA Common Digital Transponder (MT032) Manufacturer Information Manufacturer Name: BAE Systems LP Manufacturer Location: Greenlawn, NY Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Jun 2025 Jun 2026 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 366 / 12.482 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 366 / 12.482 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 366 / 12.482 366 / 12.482 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 366 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 366 Out 366 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 366 Footnotes: (1) Ancillary hardware procurements only require a 6 month production lead time. Current inventory objective is 581, which includes 9 additional units purchased in the prior years to provide to the Mode 5 program contractor that will not be installed. FY18-FY22 procured 131 units and FY23 procured 15 units for Naval Surface Warfare. 10 units per year will be procured for Naval Surface Warfare. Procurements for Naval Surface Warfare will not be installed under BLI 2851. FY27 break in procurement due to the AN/APX-123 tech refresh effort, the updated units will be available for purchase in FY28. LI 2851 - ID Systems Navy UNCLASSIFIED Page 6 of 37 P-1 Line #58 Volume 2 - 476 === page 557 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / AN/UPX 24 (V) Mode S (MT035) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 98.265 9.497 6.574 6.493 0.000 6.493 6.373 3.513 1.744 7.776 0.000 - - - - - - - - - - - 98.265 9.497 6.574 6.493 0.000 6.493 6.373 3.513 1.744 7.776 0.000 - - - - - - - - - - - 98.265 9.497 6.574 6.493 0.000 6.493 6.373 3.513 1.744 7.776 0.000 Total 140.235 140.235 140.235 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Incorporation of a Mode S capability in the AN/UPX-24(V) to include an interface with a ship's Combat Systems. Inventory Objective of 130 is derived from the Naval Data Environment database, the Ships & Aircraft Supplemental Data Table (SASDT) and ship/submarine Ship Program Manager (SPM) procurement plans and schedules. LI 2851 - ID Systems Navy UNCLASSIFIED Page 7 of 37 P-1 Line #58 Volume 2 - 477 === page 558 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/UPX-24(V) Related RDT&E PEs: 0604777N Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 2 / AN/UPX 24 (V) Mode S (MT035) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: AN/UPX 24 (V) Mode S (MT035) B Kits Non-Recurring 1.1.1) Equipment - NonOrganic (2) Subtotal: Non-Recurring Subtotal: AN/UPX 24 (V) Mode S (MT035) Subtotal: Procurement, All Modification Items 102 / 22.292 / 22.292 - 102 / 22.292 - 12 / 2.912 / 2.912 - 3 / 0.743 / 0.743 - 12 / 2.912 7 / 1.767 - / - / 1.767 - / - 7 / 1.767 - / - - 3 / 0.743 7 / 1.767 / 1.767 - 6 / 1.545 - / - - / - - / - / 1.545 - / - - / - - / - 6 / 1.545 - / - - / - - / - - / - - / - - / - - 7 / 1.767 / 22.292 - / 2.912 - / 0.743 - / 1.767 - / - - / 1.767 - / 1.545 - / / 0.000 - / - 130 / 29.259 / 29.259 - 130 / 29.259 / 0.000 - / 29.259 Support (All Modification Items) 2.1) ILS 2.2) PE (3) 2.3) Product Improvement / 7.599 - / 0.825 - / 0.842 - / 0.858 - / - - / 0.858 - / 0.657 - / 0.670 - / 0.335 - / 0.339 - / - - / 12.125 - / 26.333 - / 3.208 - / 3.167 - / 3.230 - / - - / 3.230 - / 3.043 - / 1.852 - / 0.926 - / 0.937 - / - - / 42.696 - / 32.775 / - - / - / - - / 0.220 - / 0.223 - / 6.237 - / - - / 0.113 - / - / 0.188 - / 0.224 - / 0.260 - / 0.263 - / - - / 3.627 / 0.046 - - / / 0.284 - - - / 0.046 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2.6) Initial Training - / 0.274 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / - - / 4.201 - / 3.888 - / 2.966 - / 1.744 - / 7.776 - / 0.000 - / 98.223 / 0.000 - / 0.525 - / 0.940 - / 0.547 - / 0.000 - / 0.000 - / 0.000 - / 12.753 / - - / 0.525 - / 0.940 - / 0.547 / - - / 0.000 - / 12.753 / 4.449 - / 4.293 - / 4.201 - / 39.455 2.5) Depot - / 0.113 - / 1.879 / 68.906 - / - - - / 0.416 - 2.4) Acceptance, Test & Evaluation Subtotal: Support - / - / 0.274 Installation Modification Item 1 of 1: AN/UPX 24 (V) Mode S (MT035) - / 7.067 - / 2.136 - / 1.538 - / 0.525 Subtotal: Installation - / 7.067 - / 2.136 - / 1.538 - / 0.525 - - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 98.265 9.497 6.574 6.493 0.000 UNCLASSIFIED Page 8 of 37 6.493 6.373 3.513 P-1 Line #58 1.744 7.776 0.000 140.235 Volume 2 - 478 === page 559 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / AN/UPX 24 (V) Mode S (MT035) MDAP/MAIS Code: Modification Item 1 of 1: AN/UPX 24 (V) Mode S (MT035) Manufacturer Information Manufacturer Name: NAWCAD 4.11.2.1 Manufacturer Location: St. Inigoes, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 FY 2029 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Dec 2028 FY 2030 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 85 / 7.067 17 / 2.136 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 102 / 9.203 12 / 1.538 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 1.538 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - 3 / 0.525 0 / 0.000 3 / 0.525 - / - - / - - / - - / - 0 / 0.000 3 / 0.525 FY 2027 - / - - / - - / - - / - - / - - / - 7 / 0.940 - / - - / - - / - 0 / 0.000 7 / 0.940 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 0.547 - / - - / - 0 / 0.000 6 / 0.547 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.547 - / - - / - 0 / 0.000 Total 85 / 7.067 17 / 2.136 12 / 1.538 3 / 0.525 0 / 0.000 3 / 0.525 7 / 0.940 130 / 12.753 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 85 5 4 4 4 4 4 4 - 2 1 - - 2 2 2 1 2 2 2 - - - - - - - - - - 130 Out 85 5 4 4 4 4 4 4 - 2 1 - - 2 2 2 1 2 2 2 - - - - - - - - - - 130 Footnotes: (2) Adjustment to procurements and installs are based on shift in ship availabilities and to align with Aegis Modernization schedules. Prior year procurement and installs adjusted to reflect actuals. Current Inventory Objective is 130. New Construction Ships added to the fleet, prior to Mode S Cut in will need retrofit. (3) PE fluctuates as the program transitions from less complex installs on small number of ship classes with limited combat system configurations some years to installs on multiple ship classes with various additional combat system configurations other years. LI 2851 - ID Systems Navy UNCLASSIFIED Page 9 of 37 P-1 Line #58 Volume 2 - 479 === page 560 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Mark XII Mode 5 (MT037) MDAP/MAIS Code: Prior Years 181.689 181.689 181.689 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.781 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.781 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.781 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 182.470 182.470 182.470 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Mark XIIA Mode 5 provides improved secure cooperative combat identification throughout Identification Friend or Foe (IFF). Mode 5 is a product improvement which is designed to be installed via engineering changes to digital Mark XII interrogators and transponders including, AN/APX-118/123(V) Common Digital Transponder (CXP), AN/UPX-37/41/45 Digital Interrogator (DI), and AN/UPX-24(V). Procurements will include Cryptography, Long Lead Items, Low-Rate Initial Production (LRIP) Units, Full Rate Production units, Support/Test Equipment, and associated hardware and software changes for Fleet Modernization Plan (FMP) and non-FMP installations. Mode 5 is designed to be installed in all Navy ships which are currently Mode 4 IFF capable. Milestone C and LRIP was approved in July 2006 and Full Rate Production was approved in July 2012. In March 2007, Joint Requirements Oversight Council Memorandum (JROCM 047-07) endorsed a Mode 5 Joint Full Operational Capability in FY2020. Procurement and installs differ by 108 units due to Naval Special Warfare Forces, which will be installing their own units. LI 2851 - ID Systems Navy UNCLASSIFIED Page 10 of 37 P-1 Line #58 Volume 2 - 480 === page 561 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/APX-118/123(V), AN/UPX-37/41(C), AN/UPX-24(V) Prior Years Financial Plan Modification Number / Title: 3 / Mark XII Mode 5 (MT037) Related RDT&E PEs: 0604777N Modification Type: Capability Improvement FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Mark XII Mode 5 (MT037) B Kits Non-Recurring 1.1.1) Equipment - Organic - Organic / 3.775 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 427 / 14.690 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.3) Mode 5 UPX-24(V) Kits - NonOrganic 110 / 7.970 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 110 / 7.970 1.1.4) Mode 5 DI Systems/ Kits - NonOrganic 293 / 11.970 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 293 / 11.970 1.1.2) Mode 5 CXP Systems/Kits - NonOrganic Subtotal: Non-Recurring Subtotal: Mark XII Mode 5 (MT037) Subtotal: Procurement, All Modification Items - / 38.405 - / - - / - - / - - / - - / - - / - - / - - / - - / - 830 / 38.405 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 38.405 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 0.000 - / / 0.000 - - / 3.775 427 / 14.690 / 38.405 - 830 / 38.405 / 38.405 - Support (All Modification Items) 2.1) Support Equipment - / 9.559 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2.2) ILS - / 8.556 - / 0.079 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 59.121 - / 0.702 - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2.3) PE - 2.4) Product Improvement - - / 9.559 / 8.635 / 59.823 / 13.364 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.5) Acceptance, Test & Evaluation - / 6.631 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2.6) Initial Training - / 0.517 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.781 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 98.529 / 0.000 - / 0.000 - / 45.536 / - - / 0.000 - / 45.536 Subtotal: Support - / 97.748 - Modification Item 1 of 1: Mark XII Mode 5 (MT037) - / 45.536 - Subtotal: Installation - / 45.536 / 13.364 / 6.631 / 0.517 Installation / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 181.689 0.781 0.000 0.000 0.000 UNCLASSIFIED Page 11 of 37 0.000 0.000 0.000 P-1 Line #58 0.000 0.000 0.000 182.470 Volume 2 - 481 === page 562 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Mark XII Mode 5 (MT037) MDAP/MAIS Code: Modification Item 1 of 1: Mark XII Mode 5 (MT037) Installation Information Method of Implementation: [none specified]:: Installation Name: Mode 5 CXP Systems/Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 319 / 14.349 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 319 / 14.349 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 319 / 14.349 319 / 14.349 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 319 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 319 Out 319 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 319 Method of Implementation: [none specified]:: Installation Name: Mode 5 UPX-24(V) Kits Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 110 / 7.874 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 2851 - ID Systems Navy 110 / 7.874 UNCLASSIFIED Page 12 of 37 P-1 Line #58 Volume 2 - 482 === page 563 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Mark XII Mode 5 (MT037) MDAP/MAIS Code: Modification Item 1 of 1: Mark XII Mode 5 (MT037) Installation Information Method of Implementation: [none specified]:: Installation Name: Mode 5 UPX-24(V) Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - 0 / 0.000 110 / 7.874 Total 110 / 7.874 / - / - / - / - / - / - / - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 110 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 110 Out 110 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 110 Method of Implementation: [none specified]:: Installation Name: Mode 5 DI Systems/ Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 293 / 23.313 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 293 / 23.313 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 293 / 23.313 293 / 23.313 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 293 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 293 Out 293 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 293 LI 2851 - ID Systems Navy UNCLASSIFIED Page 13 of 37 P-1 Line #58 Volume 2 - 483 === page 564 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / Mode S Digital Interrogator (MT040) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 91.910 11.682 8.483 7.670 0.000 7.670 8.751 13.866 10.652 - - - - - - - - - 91.910 11.682 8.483 7.670 0.000 7.670 8.751 13.866 10.652 - - - - - - - - - 91.910 11.682 8.483 7.670 0.000 7.670 8.751 13.866 10.652 To FY 2031 Complete 12.573 Continuing - Continuing - 12.573 Continuing - Total - Continuing - - 12.573 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Adds Mode Select (S) Beacon System commercial aircraft interrogation capability to shipboard IFF Digital Interrogators (DIs). Incorporation of a Mode S capability in the AN/UPX-41(C) will result in a nomenclature change to AN/UPX-45(C) and AN/UPX-50(C). In some installations, such as Aircraft Carriers, incorporation of the Mode S capability in the DI will include an interface with a ship's Air Traffic Control System. Mode S provides improved aircraft surveillance and communications necessary to support air traffic control automation in the dense traffic environments. Mode S provides more accurate aircraft positional information and minimizes interference by discrete interrogation of each Mode S transponder-equipped aircraft and improved processing of aircraft replies. In addition, Mode S provides the medium for a digital data link, which can be used to exchange information between aircraft and various air traffic control functions and weather databases. Inventory Objective of 286 is derived from the Naval Data Environment database, the Ships & Aircraft Supplemental Data Table and ship/submarine Ship Program Manager Procurement plans and schedules. LI 2851 - ID Systems Navy UNCLASSIFIED Page 14 of 37 P-1 Line #58 Volume 2 - 484 === page 565 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/UPX-37, AN/ UPX-41(C), AN/UPX-45(C), AN/UPX-50(C) Related RDT&E PEs: 0604777N Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 4 / Mode S Digital Interrogator (MT040) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Mode S Digital Interrogator (MT040) B Kits Non-Recurring 1.1.1) Equipment - NonOrganic (4) 203 / 5.078 1.1.2) Tech Refresh - NonOrganic - Subtotal: Non-Recurring - Subtotal: Mode S Digital Interrogator (MT040) / / 5.078 203 / 5.078 Subtotal: Procurement, All Modification Items 33 / 1.796 - / / 1.796 - 33 / 1.796 - / 5.078 2.1) Support Equipment - / 0.688 2.2) ILS - / 5.965 - - / 47.102 - - / 19.717 / 1.796 - 11 / 0.611 - / / 0.611 - 11 / 0.611 / 0.611 - 18 / 1.019 - - / - 18 / 1.019 / - - / - / 1.019 - / - - 18 / 1.019 - / - 18 / 1.019 / 1.019 - / - - - - - 21 / 1.213 / / 1.019 / 1.019 - - / - - / - / - - / - 31 / 1.863 / 1.213 - / - - 21 / 1.213 - / - 31 / 1.863 / 1.213 - / - - - - / 1.863 / 1.863 - / - 31 / 1.886 - 224 / 8.372 / 1.886 - 31 / 1.886 / 8.372 - 224 / 8.372 / 1.886 - / - / 8.372 - 286 / 9.717 286 / 12.121 / 21.838 - 572 / 21.838 / 21.838 - Support (All Modification Items) 2.3) PE (5) 2.4) Product Improvement - - - / 5.482 - / - / 4.317 - / - - / - - / - - - / 4.534 - / - - / - - / - - - / 4.534 - / - - / - - - / 0.781 / - - / 0.452 / - - / 0.457 - / - / 4.630 - / 2.974 - / 2.491 - / 2.521 - / - / - - / 7.877 - / 5.213 - / 4.698 / 0.615 - / 0.627 - / 0.633 - Continuing - / 0.688 - / 11.345 - / 74.051 Continuing / 0.438 - / - / 0.639 - / - - / 8.110 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.200 2.7) Initial Training - / 0.423 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.423 - / - - / 5.897 - / 6.188 / 0.000 - / 0.754 - / 1.350 / - - / 0.754 - / 1.350 / 6.811 - / 5.658 - / 5.897 - / - - / 0.438 - / - / 0.943 / 0.200 / 78.405 - / / 0.925 / 4.310 - / 0.434 - / / 0.925 - Subtotal: Support - - - (6) / 0.414 - / / 0.907 2.6) Depot 2.5) Acceptance, Test & Evaluation - / / 0.915 / 12.259 - / 8.789 - / 8.315 Continuing Continuing - / 1.607 - / 0.000 - / 2.372 - / 21.379 - / 41.178 - / 1.607 / - - / 2.372 - / 21.379 - / 41.178 - Installation Modification Item 1 of 1: Mode S Digital Interrogator (MT040) - / 8.427 - / 3.075 - / 2.214 - / 0.754 Subtotal: Installation - / 8.427 - / 3.075 - / 2.214 - / 0.754 - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 91.910 11.682 8.483 7.670 0.000 UNCLASSIFIED Page 15 of 37 7.670 8.751 13.866 P-1 Line #58 10.652 12.573 Continuing Continuing Volume 2 - 485 === page 566 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Mode S Digital Interrogator (MT040) MDAP/MAIS Code: Modification Item 1 of 1: Mode S Digital Interrogator (MT040) Manufacturer Information Manufacturer Name: BAE Systems LP Manufacturer Location: Greenlawn, NY Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 FY 2029 Dec 2029 Dec 2030 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2030 Dec 2031 Installation Information Method of Implementation: AIT:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 156 / 8.427 47 / 3.075 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 203 / 11.502 33 / 2.214 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 33 / 2.214 11 / 0.754 - / - - / - - / - - / - 0 / 0.000 11 / 0.754 18 / 1.350 - / - - / - - / - 0 / 0.000 18 / 1.350 21 / 1.607 - / - - / - 0 / 0.000 21 / 1.607 Prior Years FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 21 / 1.607 - / - - / - 0 / 0.000 Total 156 / 8.427 47 / 3.075 11 / 0.754 33 / 2.214 0 / 0.000 11 / 0.754 0 / 0.000 11 / 0.754 18 / 1.350 286 / 17.427 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 156 12 12 12 11 8 8 8 9 3 3 3 2 5 5 5 3 5 6 5 5 - - - - - - - - - 286 Out 156 12 12 12 11 8 8 8 9 3 3 3 2 5 5 5 3 5 6 5 5 - - - - - - - - - 286 Method of Implementation: AIT:: Installation Name: Tech Refresh Installation Cost Prior Years LI 2851 - ID Systems Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - / - / - / - / - / - UNCLASSIFIED Page 16 of 37 / - / - / - P-1 Line #58 / - / - / - / - Volume 2 - 486 === page 567 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Mode S Digital Interrogator (MT040) MDAP/MAIS Code: Modification Item 1 of 1: Mode S Digital Interrogator (MT040) Installation Information Method of Implementation: AIT:: Installation Name: Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 31 / 2.401 31 / 2.401 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 224 / 18.978 224 / 18.978 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - 31 / 2.372 255 / 21.379 286 / 23.751 Installation Cost 31 / 2.372 0 / 0.000 31 / 2.372 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - 7 8 8 8 255 286 Out - - - - - - - - - - - - - - - - - - - - - - - - - 7 8 8 8 255 286 Footnotes: (4) (5) (6) Variations in procurement are correlated with installation schedules and ship availabilities. FY27 increase is required for implementation of software trouble reports on the production line. Acceptance, Test & Evaluation (ATE) cost is based on ship availabilities and to align with Aegis Modernization schedules, and aligns with procurements/installs. LI 2851 - ID Systems Navy UNCLASSIFIED Page 17 of 37 P-1 Line #58 Volume 2 - 487 === page 568 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / OE-120/UPX Antenna (MT041) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 38.401 11.985 14.639 9.098 0.000 9.098 18.686 18.247 19.244 14.139 20.203 - - - - - - - - - - - 38.401 11.985 14.639 9.098 0.000 9.098 18.686 18.247 19.244 14.139 20.203 - - - - - - - - - - - 38.401 11.985 14.639 9.098 0.000 9.098 18.686 18.247 19.244 14.139 20.203 Total 164.642 164.642 164.642 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The OE-120/UPX antenna radiates Identification Friend or Foe (IFF) encoded radio frequency (RF) challenge pulses into space and receives the resultant IFF encoded RF transponder replies from space. Current surface ship OE-120/UPX antenna systems will receive upgrade kits to improve system Reliability & Maintainability (R&M). The upgrade kits will use open architecture and current technology that allows for continued production and future growth. LI 2851 - ID Systems Navy UNCLASSIFIED Page 18 of 37 P-1 Line #58 Volume 2 - 488 === page 569 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: OE-120/UPX Antenna Group Prior Years Financial Plan Modification Number / Title: 5 / OE-120/UPX Antenna (MT041) Related RDT&E PEs: 0604777N Modification Type: Reliability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: OE-120/UPX Antenna (MT041) B Kits Non-Recurring 1.1.1) Equipment - NonOrganic 21 / 8.049 (7) Subtotal: Non-Recurring - Subtotal: OE-120/UPX Antenna (MT041) / 8.049 5 / 2.027 Subtotal: Procurement, All Modification Items - / 2.027 - 21 / 8.049 5 / 2.068 - 5 / 2.027 / 2.068 - 5 / 2.068 3 / 1.489 - / - / 1.489 - / - 3 / 1.489 - / - 3 / 1.489 - / 1.489 7 / 4.169 - 3 / 1.489 / 4.169 5 / 3.037 - 7 / 4.169 / 3.037 5 / 3.644 - 5 / 3.037 / 3.644 5 / 3.610 / 3.610 - 5 / 3.644 5 / 3.653 / 3.653 - 5 / 3.610 5 / 3.653 - / - - / 3.653 / 31.746 - 61 / 31.746 / 8.049 - / 2.027 - / 2.068 - / 1.489 - / - - / 1.489 - / 4.169 - / 3.037 - / 3.644 / 2.629 - / 0.204 - / 0.398 - / 0.406 - / - - / 0.406 - / 0.268 - / 0.422 - / 0.633 / 13.629 - / 3.061 - / 3.298 - / 1.551 - / - - / 1.551 - / 1.583 - / 1.698 - / 1.901 - / 0.092 - / - - / 26.813 / - - / 2.096 - / 2.055 - / - - / 2.055 - / 2.949 - / 4.569 - / 4.222 - / 4.436 - / - - / 23.257 - / 3.610 61 / 31.746 / 31.746 - Support (All Modification Items) 2.1) ILS - 2.2) PE 2.3) Product Improvement - (8) 2.4) Acceptance, Test & Evaluation Subtotal: Support - / 2.930 - - / 0.511 - / 5.471 / 4.984 - / 1.673 - / 1.695 - / 1.729 - / - - / 1.729 - / 2.112 - / 2.154 - / 2.350 - / 2.378 - / 4.694 - / 23.769 / 24.172 - / 4.938 - / 7.487 - / 5.741 - / - - / 5.741 - / 6.912 - / 8.843 - / 9.106 - / 6.906 - / 5.205 - / 79.310 / 0.000 - / 1.868 - / 7.605 - / 6.367 - / 6.494 - / 3.623 - / 11.345 - / 53.586 / - - / 1.868 - / 7.605 - / 6.367 - / 6.494 - / 3.623 - / 11.345 - / 53.586 Installation Modification Item 1 of 1: OE-120/UPX Antenna (MT041) - / 6.180 - / 5.020 - / 5.084 - / 1.868 Subtotal: Installation - / 6.180 - / 5.020 - / 5.084 - / 1.868 - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 38.401 11.985 14.639 9.098 0.000 UNCLASSIFIED Page 19 of 37 9.098 18.686 18.247 P-1 Line #58 19.244 14.139 20.203 164.642 Volume 2 - 489 === page 570 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / OE-120/UPX Antenna (MT041) MDAP/MAIS Code: Modification Item 1 of 1: OE-120/UPX Antenna (MT041) Manufacturer Information Manufacturer Name: BAE Systems LP Manufacturer Location: Nashua, NJ Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 23 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Feb 2033 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 11 / 6.180 - Prior Years 5 / 5.020 5 / 5.084 - / - - / - - / - - / - 0 / 0.000 21 / 16.284 FY 2025 - / - - / - - / - 3 / 1.868 0 / 0.000 3 / 1.868 2 / 1.270 - / - - / - - / - 0 / 0.000 5 / 3.138 FY 2026 - / - - / - - / - - / - - / - - / - 5 / 6.335 - / - - / - - / - 0 / 0.000 5 / 6.335 FY 2027 - / - - / - - / - - / - - / - - / - - / - 3 / 6.367 - / - - / - 0 / 0.000 3 / 6.367 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 6.494 - / - 0 / 0.000 7 / 6.494 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.623 0 / 0.000 5 / 3.623 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.762 5 / 3.762 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.769 5 / 3.769 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.814 5 / 3.814 5 / 3.623 15 / 11.345 61 / 53.586 Total 11 / 6.180 5 / 5.020 5 / 5.084 / - - 3 / 1.868 / - - 0 / 0.000 / - 3 / 1.868 7 / 7.605 3 / 6.367 7 / 6.494 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 11 - 3 2 - - 3 2 - - 1 2 - - 4 3 - - 2 1 - 2 2 2 1 2 2 1 - 15 61 Out 11 - 3 2 - - 3 2 - - 1 2 - - 4 3 - - 2 1 - 2 2 2 1 2 2 1 - 15 61 Footnotes: (7) (8) FY27 unit cost increase is due to production cut-ins to resolve obsolescence and supply chain issues. Product Improvement is required to address parts obsolescence to include but not limited to single board computers and fiber optic converters. Funding is also required to update the current operating system software to an Information Assurance (IA) compliant operating system. LI 2851 - ID Systems Navy UNCLASSIFIED Page 20 of 37 P-1 Line #58 Volume 2 - 490 === page 571 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / AN/UPX-46 Processor System (MT042) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 45.789 11.425 10.061 6.701 0.000 6.701 11.993 8.095 8.168 - - - - - - - - - 45.789 11.425 10.061 6.701 0.000 6.701 11.993 8.095 8.168 - - - - - - - - - 45.789 11.425 10.061 6.701 0.000 6.701 11.993 8.095 8.168 To FY 2031 Complete 7.064 Continuing - Continuing - 7.064 Continuing - Total - Continuing - - 7.064 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Replace or upgrade unique Shipboard IFF Interrogator Systems with common hardware configurations including the CP-2819/UPX processor, AN/APX-123(V) Common Digital Transponder (CXP), and Mark XIIA Digital Interrogator (DI) equipment. Unique interrogator systems will not meet Mode 5 requirements per Mark XIIA Cooperative IFF Operational Requirements Document 595-61-02 - dated 27 Apr 2001. Inventory Objective is 51. LI 2851 - ID Systems Navy UNCLASSIFIED Page 21 of 37 P-1 Line #58 Volume 2 - 491 === page 572 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / AN/UPX-46 Processor System (MT042) MDAP/MAIS Code: Models of Systems Affected: UPX-29/UPX29A/ UPX-46 Processor System Prior Years Related RDT&E PEs: 0604777N Modification Type: Reliability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/UPX-46 Processor System (MT042) B Kits Non-Recurring 1.1.1) Mode 5 AN/UPX-46 Systems/Kits - NonOrganic (9) 19 / 13.315 1.1.2) Mode 5 CXP Systems/Kits - NonOrganic 1.1.3) Mode 5 DI Systems/Kits - NonOrganic (10) 1.1.4) Mode 5 AN/UPX-46 System/Kits Tech Refresh NonOrganic Subtotal: Non-Recurring Subtotal: AN/UPX-46 Processor System (MT042) Subtotal: Procurement, All Modification Items / - - - / / - 3 / 2.319 - / - - / - - / - - 29 / 20.779 / - - / - - / - - / - - / - - / - 5 / 0.250 - / - 2 / 0.619 2 / 0.632 2 / 0.644 - / - - / - - / - 17 / 5.259 - - - - / - - / - - - - 3 / 0.931 / 3.510 / 2.837 - 6 / 3.510 / 15.727 - / 3.510 / 12.258 - / 1.018 / 1.255 - / 0.568 - / 10.430 - / 3.452 - / 2.837 - / 0.619 - / - 2 / 0.619 - / - / 0.619 - / - - 5 / 2.837 - / / 0.619 - / 0.619 - / / 2.951 - 2 / 0.619 / - / - 2 / 0.619 / - - - 2 / 0.607 / - / - - - - - / - 2 / 0.595 / - / - - 7 / 2.162 31 / 15.727 - 3 / 2.230 5 / 0.250 / 15.727 - 4 / 2.915 / 2.951 - / 0.644 - 5 / 2.951 / - / 0.644 - / 0.931 - 2 / 0.644 3 / 0.942 / 0.931 - / 0.942 - 3 / 0.931 3 / 0.942 / 0.942 - 23 / 27.014 - / 27.014 23 / 27.014 - / 27.014 29 / 28.887 - / 55.175 80 / 55.175 - / 55.175 - / 13.276 Support (All Modification Items) 2.1) Support Equipment - 2.2) ILS 2.3) PE - - - / 3.530 - / - - / - - / - / 0.591 - / - - - / 3.600 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.591 - / 0.603 - / 0.615 - / 0.622 - / 0.466 Continuing Continuing / 3.600 - / 3.672 - / 3.596 - / 2.944 - / 1.812 Continuing Continuing / - - / 1.390 - / 1.396 - / 1.020 - / 1.032 Continuing Continuing - / 2.021 2.5) Acceptance Test & Evaluation - / 1.430 - / 0.400 - / 0.408 - / 0.416 - / - - / 0.416 - / 0.424 - / 0.432 - / 0.440 - / 0.445 Continuing Continuing / 27.394 - / 5.438 - / 4.517 - / 4.607 - / - - / 4.607 - / 6.089 - / 6.039 - / 5.026 - / 3.755 Continuing Continuing / 0.000 - / 1.475 - / 2.953 - / 1.412 - / 2.211 - / 2.367 - / 12.383 - / 30.653 / - - / 1.475 - / 2.953 - / 1.412 - / 2.211 - / 2.367 - / 12.383 - / 30.653 - / - / / 0.579 2.4) Product Improvement Subtotal: Support - - Installation Modification Item 1 of 1: AN/UPX-46 Processor System (MT042) - / 2.668 - / 2.477 - / 2.707 - / 1.475 Subtotal: Installation - / 2.668 - / 2.477 - / 2.707 - / 1.475 - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 45.789 11.425 10.061 6.701 0.000 UNCLASSIFIED Page 22 of 37 6.701 11.993 8.095 P-1 Line #58 8.168 7.064 Continuing Continuing Volume 2 - 492 === page 573 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / AN/UPX-46 Processor System (MT042) MDAP/MAIS Code: Modification Item 1 of 1: AN/UPX-46 Processor System (MT042) Manufacturer Information Manufacturer Name: NAWCAD Manufacturer Location: St. Inigoes, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Dec 2032 Installation Information Method of Implementation: AIT:: Installation Name: AN/UPX-46 Processor System Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 2.668 14 / 2.477 - Prior Years 7 / 2.707 - / - - / - - / - - / - 0 / 0.000 31 / 7.852 FY 2025 - / - - / - - / - 4 / 1.475 0 / 0.000 4 / 1.475 2 / 1.280 - / - - / - - / - 0 / 0.000 6 / 2.755 FY 2026 - / - - / - - / - - / - - / - - / - 4 / 1.673 1 / 0.396 - / - - / - 0 / 0.000 5 / 2.069 FY 2027 - / - - / - - / - - / - - / - - / - - / - 2 / 1.016 - / - - / - 0 / 0.000 2 / 1.016 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.211 - / - 3 / 0.063 5 / 2.274 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.128 0 / 0.000 2 / 1.128 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 10 / 2.668 14 / 2.477 7 / 2.707 / - - 4 / 1.475 / - - 0 / 0.000 / - 4 / 1.475 6 / 2.953 3 / 1.412 2 / 2.211 2 / 1.128 3 / 0.063 51 / 17.094 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 4 4 4 2 2 2 1 2 3 - 1 - 4 2 - - 3 - - - 1 1 - - 1 1 - - 3 51 Out 10 4 4 4 2 2 2 1 2 3 - 1 - 4 2 - - 3 - - - 1 1 - - 1 1 - - 3 51 LI 2851 - ID Systems Navy UNCLASSIFIED Page 23 of 37 P-1 Line #58 Volume 2 - 493 === page 574 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / AN/UPX-46 Processor System (MT042) MDAP/MAIS Code: Modification Item 1 of 1: AN/UPX-46 Processor System (MT042) Installation Information Method of Implementation: AIT:: Installation Name: Mode 5 AN/UPX-46 System/Kits Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.239 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.239 3 / 1.239 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 11.081 23 / 11.081 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.239 26 / 12.320 29 / 13.559 Installation Cost 0 / 0.000 3 / 1.239 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - 1 1 1 - 26 29 Out - - - - - - - - - - - - - - - - - - - - - - - - - 1 1 1 - 26 29 Footnotes: (9) The AN/UPX-46 budget was established to convert Contractor Furnished Equipment (CFE) based IFF systems to Mode 5 capability and transfer production and configuration control to organic Navy facilities. The budget will provide the Mode 5 Capability to (3) Ship Classes: LCS1 variant, LCS2 variant and WMSL (USCG). LCS1 and WMSL ship classes require modification kits to update the existing installed equipment. LCS2 ship class requires complete UPX-46 system installation. UPX-46 systems and kits require a 24 month lead time. Install costs vary from year to year due to ship availability, ship class and location of the install. Initial spares are included in overall hardware cost. (10) DI kits are required to convert legacy interrogators to Mode 5 capable interrogators. LCS1 and WMSL - Requires UPX-46 Kit (includes CXP and DI), this converts the existing transponder and interrogator equipment to Mode 5 capable end items. LI 2851 - ID Systems Navy UNCLASSIFIED Page 24 of 37 P-1 Line #58 Volume 2 - 494 === page 575 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 8.158 3.336 3.761 0.804 0.000 0.804 0.000 0.000 0.000 0.000 0.000 16.059 Total - - - - - - - - - - - - 8.158 3.336 3.761 0.804 0.000 0.804 0.000 0.000 0.000 0.000 0.000 16.059 - - - - - - - - - - - - 8.158 3.336 3.761 0.804 0.000 0.804 0.000 0.000 0.000 0.000 0.000 16.059 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: AN/UPX-34A Radar Track Discriminator System (RTDS) is installed on CG47 Class Aegis Cruisers and provides high fidelity, long range, Non-Cooperative Target Recognition (NCTR) capability to support the Air-Sea battle by providing timely tactical engagement decisions by Aegis action officers. Upgrades to the system will reduce Rules of Engagement (ROE) concerns, incorporate "other services" target libraries into the RTDS database, and increase the system's range performance. These enhancements are critical to the Aegis Cruiser's primary Anti-Air warfare (AAW) role. These enhancements also provide critical capability to accurately identify and discern civilian versus military aircraft. Inventory objective 9. LI 2851 - ID Systems Navy UNCLASSIFIED Page 25 of 37 P-1 Line #58 Volume 2 - 495 === page 576 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) MDAP/MAIS Code: Models of Systems Affected: Radar Track Discriminator System (RTDS) AN/UPX-34A Modification Type: Reliability Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) B Kits Non-Recurring 1.1.1) AN/UPX-34A Kit - NonOrganic 5 / 1.681 (11) Subtotal: Non-Recurring - Subtotal: Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) Subtotal: Procurement, All Modification Items / 1.681 1 / 0.500 / 0.500 - 5 / 1.681 3 / 1.485 - / - - / - - / - - / - - / - - / - - / - / 1.485 - / - - / - - / - - / - - / - - / - - / - 3 / 1.485 - / - - / - - / - - / - - / - - / - - / - - 1 / 0.500 - / 1.681 - / 0.500 - / 1.485 - / - - / - - / - - / - - / - - / - - / - 2.1) ILS - / 0.416 - / 0.223 - / 0.243 - / - - / - - / - - / - - / - - / - - / - 2.2) PE - / 3.535 - / 1.546 - / 1.469 - / - - / - - / - - / - - / - - / - - / - 2.3) Product Improvement - / 1.461 / - - / - - / - - / - - / - - / - - / - - 2.4) Acceptance Test and Evaluation - / 0.409 - / 0.215 - / 0.220 - / - - / - - / - - / - - / - - / - 2.5) Initial Training - / 0.151 - / 0.079 - / 0.081 - / - - / - - / - - / - - / - - Subtotal: Support - / 5.972 - / 2.063 - / 2.013 - / - - / - - / - - / - - / - - Modification Item 1 of 1: Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) - / 0.505 - / 0.773 - / 0.263 - / 0.804 Subtotal: Installation - / 0.505 - / 0.773 - / 0.263 - / 0.804 - / - 9 / 3.666 / 0.000 - - / - / 3.666 9 / 3.666 / 0.000 - / 3.666 - / - - / 0.882 - / - - / 6.550 / - - / - - / 1.461 - / - - / - - / 0.844 / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 2.345 / - - / 0.000 - / 2.345 - Support (All Modification Items) - / - - / 0.311 / 10.048 - Installation - / 0.000 - / 0.804 / - - / 0.804 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 8.158 3.336 3.761 0.804 0.000 UNCLASSIFIED Page 26 of 37 0.804 0.000 0.000 P-1 Line #58 0.000 0.000 0.000 16.059 Volume 2 - 496 === page 577 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) MDAP/MAIS Code: Modification Item 1 of 1: Radar Track Discriminator System (RTDS) AN/UPX-34A (MT043) Manufacturer Information Manufacturer Name: NAWCAD WOLF Manufacturer Location: St. Inigoes, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 Contract Dates Dec 2024 Dec 2025 Delivery Dates Dec 2025 Dec 2026 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: AN/UPX-34A Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 0.505 3 / 0.773 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 1.278 FY 2025 - / - - / - 1 / 0.263 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.263 FY 2026 - / - - / - - / - 3 / 0.804 0 / 0.000 3 / 0.804 - / - - / - - / - - / - 0 / 0.000 3 / 0.804 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 0.505 3 / 0.804 - / - - / - - / - - / - 0 / 0.000 Installation Cost 3 / 0.773 1 / 0.263 3 / 0.804 0 / 0.000 9 / 2.345 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 2 1 - - 1 - - - 2 1 - - - - - - - - - - - - - - - - - - - 9 Out 2 2 1 - - 1 - - - 2 1 - - - - - - - - - - - - - - - - - - - 9 Footnotes: (11) The planned timeline and associated funding profile are aligned to ship availability within the limited access to of these ships in port. Inventory change from 10 to 9 due to reduction of cruisers in service. LI 2851 - ID Systems Navy UNCLASSIFIED Page 27 of 37 P-1 Line #58 Volume 2 - 497 === page 578 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / AN/UPX-36 Replacement (MT044) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 15.481 9.565 6.298 1.338 0.000 1.338 0.528 0.000 0.000 0.000 0.000 33.210 Total - - - - - - - - - - - - 15.481 9.565 6.298 1.338 0.000 1.338 0.528 0.000 0.000 0.000 0.000 33.210 - - - - - - - - - - - - 15.481 9.565 6.298 1.338 0.000 1.338 0.528 0.000 0.000 0.000 0.000 33.210 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Replace or upgrade unique Shipboard IFF Interrogator Systems with UPX-46 common hardware configuration. Unique AN/UPX-36 interrogator systems currently installed on LSD 41 and LSD 49 ship classes will not meet Mode 5 requirements per Mark XIIA Cooperative IFF Operational Requirements Document 595-61-02 dated 27 Apr 2001. Inventory Objective is 10. LI 2851 - ID Systems Navy UNCLASSIFIED Page 28 of 37 P-1 Line #58 Volume 2 - 498 === page 579 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/UPX-36 Modification Type: Reliability Prior Years Financial Plan Modification Number / Title: 8 / AN/UPX-36 Replacement (MT044) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: AN/UPX-36 Replacement (MT044) B Kits Non-Recurring 1.1.1) AN/UPX-36A Kit - NonOrganic Subtotal: Non-Recurring 6 / 7.597 - Subtotal: AN/UPX-36 Replacement (MT044) Subtotal: Procurement, All Modification Items / 7.597 3 / 4.092 - 6 / 7.597 / 4.092 - 3 / 4.092 1 / 1.364 - / - - / - - / - - / - - / - - / - - / - / 1.364 - / - - / - - / - - / - - / - - / - - / - 1 / 1.364 - / - - / - - / - - / - - / - - / - - / - - / / 0.000 - / / 0.000 10 / 13.053 / 13.053 - 10 / 13.053 - / 7.597 - / 4.092 - / 1.364 - / - - / - - / - - / - - / - - / - - / - 2.1) Support Equipment - / 0.973 - / 0.514 - / 0.524 - / - - / - - / - - / - - / - - / - - / - - / - - 2.2) ILS - / 1.098 - / 0.866 - / 0.890 - / - - / - - / - - / - - / - - / - - / - - / - - 2.3) PE - / 5.464 - / 2.737 - / 2.024 - / - - / - - / - - / - - / - - / - - / - - / - 2.4) Acceptance Test & Evaluation - / 0.349 - / 0.180 - / 0.184 - / - - / - - / - - / - - / - - / - - / - - / 7.884 - / 4.297 - / 3.622 - / - - / - - / - - / - - / - - / - - / - - / 0.000 Modification Item 1 of 1: AN/UPX-36 Replacement (MT044) - / 0.000 - / 1.176 - / 1.312 - / 1.338 / 0.000 - / 0.000 - / 4.354 Subtotal: Installation - / 0.000 - / 1.176 - / 1.312 - / 1.338 / - - / 0.000 - / 4.354 - / 13.053 - Support (All Modification Items) Subtotal: Support - - / - / 2.011 / 2.854 / 10.225 - / 0.713 / 15.803 - Installation - / 0.000 - / 1.338 - / 0.528 / - - / 1.338 - / 0.528 - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 15.481 9.565 6.298 1.338 0.000 UNCLASSIFIED Page 29 of 37 1.338 0.528 0.000 P-1 Line #58 0.000 0.000 0.000 33.210 Volume 2 - 499 === page 580 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / AN/UPX-36 Replacement (MT044) MDAP/MAIS Code: Modification Item 1 of 1: AN/UPX-36 Replacement (MT044) Manufacturer Information Manufacturer Name: NAWCAD WOLF Manufacturer Location: St. Inigoes, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 Contract Dates Dec 2024 Dec 2025 Delivery Dates Dec 2026 Dec 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: AN/UPX-36A Kit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - 3 / 1.176 3 / 1.312 - / - - / - - / - - / - - / - 0 / 0.000 6 / 2.488 FY 2025 - / - - / - - / - 3 / 1.338 0 / 0.000 3 / 1.338 - / - - / - - / - - / - 0 / 0.000 3 / 1.338 FY 2026 - / - - / - - / - - / - - / - - / - 1 / 0.528 - / - - / - - / - 0 / 0.000 1 / 0.528 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 3 / 1.176 1 / 0.528 - / - - / - - / - 0 / 0.000 3 / 1.312 / - - 3 / 1.338 / - 0 / 0.000 3 / 1.338 10 / 4.354 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - 1 1 1 - 1 1 1 - 1 1 1 - 1 - - - - - - - - - - - - - - - - 10 Out - 1 1 1 - 1 1 1 - 1 1 1 - 1 - - - - - - - - - - - - - - - - 10 LI 2851 - ID Systems Navy UNCLASSIFIED Page 30 of 37 P-1 Line #58 Volume 2 - 500 === page 581 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / DDG 1000 Modernization (MT045) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 2.800 0.800 0.380 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.980 Total - - - - - - - - - - - - 2.800 0.800 0.380 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.980 - - - - - - - - - - - - 2.800 0.800 0.380 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.980 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Modernization of the DDG 1000 Zumwalt Class IFF Sensor Suite includes product improvement and engineering changes for a three panel electronically scanned array (ESA) antenna, one UPX-42(C) interrogator with Target Data Extractor, and three RT-1912(C)/APX or RT-1912A(C)/APX Transponders. LI 2851 - ID Systems Navy UNCLASSIFIED Page 31 of 37 P-1 Line #58 Volume 2 - 501 === page 582 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: DDG 1000 IFF Suite Prior Years Financial Plan Modification Number / Title: 9 / DDG 1000 Modernization (MT045) Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DDG 1000 Modernization (MT045) B Kits Recurring 1.1.1) Equipment - NonOrganic 3 / 1.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 1.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.103 - / 0.675 - / 0.380 - / - - / - - / - - / - - / - - / - - / - - / 1.103 - / 0.675 - / 0.380 - / - - / - - / - - / - - / - - / - - / - - Modification Item 1 of 1: DDG 1000 Modernization (MT045) - / 0.250 - / 0.125 - / 0.000 / 0.000 - Subtotal: Installation - / 0.250 - / 0.125 / - - Subtotal: Recurring - Subtotal: DDG 1000 Modernization (MT045) Subtotal: Procurement, All Modification Items - / / 0.000 - 3 / 1.447 - / - / 1.447 3 / 1.447 / 0.000 - / 1.447 / - - / 2.158 / 0.000 - / 2.158 / 0.000 - / 0.375 / 0.000 - / 0.375 Support (All Modification Items) 2.1) ILS Subtotal: Support - Installation - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 2.800 0.800 0.380 0.000 0.000 UNCLASSIFIED Page 32 of 37 0.000 0.000 0.000 P-1 Line #58 0.000 0.000 0.000 3.980 Volume 2 - 502 === page 583 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / DDG 1000 Modernization (MT045) MDAP/MAIS Code: Modification Item 1 of 1: DDG 1000 Modernization (MT045) Manufacturer Information Manufacturer Name: NAWC Manufacturer Location: St. Inigoes, NAS Patuxent River MD Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: Equipment Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 0.250 1 / 0.125 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.375 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 0.250 1 / 0.125 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 3 / 0.375 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 Out 2 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 LI 2851 - ID Systems Navy UNCLASSIFIED Page 33 of 37 P-1 Line #58 Volume 2 - 503 === page 584 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2851 / ID Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 10 / UPneXt (MT046) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 1.428 3.516 0.000 3.516 9.366 10.507 10.897 - - - - - - - - - 0.000 0.000 1.428 3.516 0.000 3.516 9.366 10.507 10.897 - - - - - - - - - 0.000 0.000 1.428 3.516 0.000 3.516 9.366 10.507 10.897 To FY 2031 Complete 10.177 Continuing - Continuing - 10.177 Continuing - Total - Continuing - - 10.177 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Modernization of the AN/UPX-24(V) includes software, firmware and hardware changes to the CP-1273/UPX-24(V) Processor-Controller. The purpose of the change is to address obsolescence, consolidation of multiple configurations and variants across the surface Navy; integration of the system architecture to reflect tomorrow's Navy combat suites; and ensure network and cyber security requirements are met. LI 2851 - ID Systems Navy UNCLASSIFIED Page 34 of 37 P-1 Line #58 Volume 2 - 504 === page 585 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / UPneXt (MT046) MDAP/MAIS Code: Models of Systems Affected: TBD Modification Type: TBD Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: UPneXt (MT046) B Kits Non-Recurring - / - - / - - / - - / - - / - - / - / 0.000 - / - - / - - / - - / - - / 0.000 - / - - - / - - / - - 2.2) PE - / - - / - - 2.3) PRODUCT IMPROVEMENT - / - - / - - / - - 2.4) ACCEPTANCE, TEST & EVALUATION - / - - / - - / - - - / 0.000 - / - - Modification Item 1 of 1: UPneXt (MT046) - / 0.000 / 0.000 - Subtotal: Installation - / 0.000 1.1.1) UPneXt Kit - NonOrganic (12) 1.1.2) UPneXt Kit Tech Refresh - NonOrganic Subtotal: Non-Recurring - Subtotal: UPneXt (MT046) Subtotal: Procurement, All Modification Items - 10 / 2.193 - / - / - - / - / 2.193 - / - - / - 10 / 2.193 - / - 10 / 2.193 / - - / 2.193 - / - - / 2.193 - / 6.934 - / 3.550 - / 3.621 - / 3.663 - / 0.213 - / 0.577 - / - - / 0.577 - / 0.605 - / 0.617 - / 0.629 - / 0.682 Continuing Continuing / 1.215 - / 0.746 - / - - / 0.746 - / 0.851 - / 1.060 - / 1.072 - / 2.923 Continuing Continuing / - - / - - / - - / 0.440 - / 0.029 - / 0.016 / - - / - - / - - / 0.536 - / 0.547 - / 0.561 / 1.323 - / - - / 1.323 - / 2.432 - / 2.253 - / 0.000 - / 0.000 - / 0.000 - / 4.704 / - - / 4.704 - 10 / 2.193 - 31 / 6.934 / / 2.193 - / / 6.934 - 31 / 6.934 - / - 10 / 3.550 - / 3.550 10 / 3.550 - / - 10 / 3.621 - / 3.621 10 / 3.621 / - 9 / 2.052 10 / 3.663 - 20 / 10.714 / 3.663 - 10 / 3.663 - / 12.766 29 / 12.766 / 12.766 50 / 11.179 50 / 21.548 / 32.727 - 100 / 32.727 / 32.727 - Support (All Modification Items) 2.1) ILS (13) Subtotal: Support / 1.428 - / 0.000 - - / - - / - - / 0.485 - / 0.568 - / - - / 2.212 / 2.278 - / 4.173 Continuing Continuing - / 4.998 - / 2.341 - / 10.637 - / 22.680 - / 4.998 - / 2.341 - / 10.637 - / 22.680 Installation - / - - / - / 0.000 - / - - / - - - / - - Total Total Cost (Procurement + Support + Installation) LI 2851 - ID Systems Navy 0.000 0.000 1.428 3.516 0.000 UNCLASSIFIED Page 35 of 37 3.516 9.366 10.507 P-1 Line #58 10.897 10.177 Continuing Continuing Volume 2 - 505 === page 586 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / UPneXt (MT046) MDAP/MAIS Code: Modification Item 1 of 1: UPneXt (MT046) Manufacturer Information Manufacturer Name: NAWC WOLF Manufacturer Location: St. Inigoes, NAS Patuxent River MD Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2028 Dec 2029 Dec 2030 Dec 2031 Dec 2032 Installation Information Method of Implementation: AIT:: Installation Name: UPneXt Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - 10 / 4.704 - / - - / - 0 / 0.000 10 / 4.704 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 31 / 4.998 - / - 0 / 0.000 31 / 4.998 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 3.413 9 / 3.413 Total - / - - / - - / - - / - - / - - / - - / - 31 / 4.998 - / - 9 / 3.413 50 / 13.115 Installation Cost 10 / 4.704 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 3 3 2 2 8 8 8 7 - - - - 9 50 Out - - - - - - - - - - - - - - - - - 3 3 2 2 8 8 8 7 - - - - 9 50 Method of Implementation: [none specified]:: Installation Name: UPneXt Kit Tech Refresh Installation Cost Prior Years LI 2851 - ID Systems Navy Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - / - / - / - / - / - UNCLASSIFIED Page 36 of 37 / - / - / - P-1 Line #58 / - / - / - / - Volume 2 - 506 === page 587 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2851 / ID Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / UPneXt (MT046) MDAP/MAIS Code: Modification Item 1 of 1: UPneXt (MT046) Installation Information Method of Implementation: [none specified]:: Installation Name: UPneXt Kit Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost 10 / 2.341 0 / 0.000 10 / 2.341 / - 10 / 2.369 10 / 2.369 / - 10 / 2.397 10 / 2.397 / - 20 / 2.458 20 / 2.458 10 / 2.341 40 / 7.224 50 / 9.565 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 2 2 40 50 Out - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 2 2 40 50 Footnotes: (12) (13) Initial buys are planned with consideration for production lead time, ship class integration and ship availabilities. FY27 ILS impacted by the amount of documentation and logistics work needed because of the differences between ship classes. LI 2851 - ID Systems Navy UNCLASSIFIED Page 37 of 37 P-1 Line #58 Volume 2 - 507 === page 588 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 508 === page 589 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) Program Elements for Code B Items: 0603860N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 238 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 268.703 268.703 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 268.703 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 To FY 2031 Complete 53.021 Continuing - Continuing - 53.021 Continuing - Total - Continuing - - 53.021 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Joint Precision Approach and Landing System (JPALS) is the primary precision approach and landing system for CVN and LHA/D ships to support aircraft without SPN-46 Automatic Carrier Landing Systems (ACLS) capability, which include F-35B, F-35C, MQ-25, CVM-22 and future platforms. The nomenclature for JPALS has been designated AN/USN-3(V)1, Satellite Signals Landing System (SSLS). JPALS ship systems are required to provide CVN and LHA/D ships a primary precision approach capability during night and instrument flight conditions, including coupled approach capability to a hover transition point for LHA/D ships, and coupled approach to the deck (auto-land) capability aboard CVN ships, and in contested environments. JPALS also provides over-the-air inertial alignment capability for CVN and LHA/D ships to support aircraft platforms without Link-4A capability, including F-35, MQ-25, CVM-22 and future platforms. JPALS MS B occurred June 2016 and MS C occurred April 2019. Production contract awarded May 2019. Material Support date March 2023. JPALS AN/USN-3 (V)2 upgrade is a GPS based precision approach landing capability in all weather and all operating environment for CVN and LHA/D ships. This supports contested environment operations for properly equipped manned and unmanned aircraft to include Air Wing of the Future (AWOTF). LI 2867 - Joint Precision Approach and Landing Sys... Navy UNCLASSIFIED Page 1 of 6 P-1 Line #59 Volume 2 - 509 === page 590 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) Program Elements for Code B Items: 0603860N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 238 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / AN/USN-3 (V) (Modernization) - / 268.703 - / 7.287 - / 5.105 - / 2.976 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 268.703 - / 7.287 - / 5.105 - / 2.976 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 2.976 / 2.976 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / AN/USN-3 (V) (Modernization) - / 6.080 - / 30.437 - / 49.454 - / 53.021 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 6.080 - / 30.437 - / 49.454 - / 53.021 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 provides additional funding for the Waveoff Circuit Card Assembly (CCA) and other various ECPs, along with the requisite government labor integral to these production efforts. LI 2867 - Joint Precision Approach and Landing Sys... Navy UNCLASSIFIED Page 2 of 6 P-1 Line #59 Volume 2 - 510 === page 591 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / AN/USN-3 (V) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 268.703 268.703 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 268.703 - - - - - - - - 7.287 5.105 2.976 0.000 2.976 6.080 30.437 49.454 To FY 2031 Complete 53.021 Continuing - Continuing - 53.021 Continuing - Total - Continuing - - 53.021 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: JPALS ship systems, now designated as Satellite Signals Landing System (SSLS), are required to provide CVN and LH ships a primary precision approach capability during night and instrument flight conditions, including coupled approach capability to a hover transition point for LHA/D ships, and coupled approach to the deck (auto-land) capability aboard CVN ships. It also provides over-the-air inertial alignment capability for CVN and LHA/D ships to support aircraft platforms without Link-4A capability, including F-35, MQ-25, CMV-22 and future platforms. LI 2867 - Joint Precision Approach and Landing Sys... Navy UNCLASSIFIED Page 3 of 6 P-1 Line #59 Volume 2 - 511 === page 592 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/USN-3 (V) MDAP/MAIS Code: Models of Systems Affected: CVN, L-class ships. Prior Years Related RDT&E PEs: 0603860N Modification Type: Modernization FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: AN/USN-3 (V) B Kits Recurring 1.1.1) ECP/OCIR - Organic - 1.1.2) LANTERNS - NonOrganic 1.1.3) AN/USN-3 (V)2 - NonOrganic (1) 1.1.4) Inactive Projects - Organic / 1.207 - / - - / 3.890 / - - 2 / 3.300 - / - - / - - / - - / - - / - - / - - - / - - / - - / - - / - - / - - / 201.771 Subtotal: Recurring - / 205.661 Subtotal: AN/USN-3 (V) - / 205.661 - / 205.661 - Subtotal: Procurement, All Modification Items / 2.287 - - / - - - / - - - / 1.207 - - / - / 4.165 / - - / - / 5.587 - / 1.961 - / 1.207 - / - - / 1.207 - / 4.165 2 / 5.587 - / 1.961 - / 1.207 - / - - / 1.207 - / 4.165 / 5.587 - / 1.961 - / 1.207 - / - - / 1.207 - / 4.165 - / - / 1.961 - - / 1.431 - - / - 3 / 26.344 / - - - / 27.775 - / 45.095 Continuing / - 5 / 45.680 - Continuing / - 12 / 111.825 / - - Continuing Continuing 5 / 45.997 Continuing Continuing / 45.997 Continuing Continuing - / - 2 / 3.300 25 / 228.634 / 45.997 - 5 / 45.095 - / 0.317 - / - / 45.095 - 3 / 27.775 - - / - 5 / 44.785 / - / 27.775 - / 0.310 - - / 201.771 Support (All Modification Items) 2.1) Integrated Logistics Support - / 23.313 - / 0.692 - / 0.706 - / 0.720 - / - - / 0.720 - / 0.734 - / 0.185 - / 0.189 - / 0.192 Continuing Continuing 2.2) Production Engineering - / 39.729 - / 1.008 - / 1.028 - / 1.049 - / - - / 1.049 - / 1.181 - / 2.477 - / 2.726 - / 4.377 Continuing Continuing - / 63.042 - / 1.700 - / 1.734 - / 1.769 - / - - / 1.769 - / 1.915 - / 2.662 - / 2.915 - / 4.569 Continuing Continuing - / 0.000 - / 1.410 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 1.444 - / 2.455 - / 8.630 - / 13.939 / - - / 1.410 / - - / 1.444 - / 2.455 - / 8.630 - / 13.939 53.021 Continuing Subtotal: Support Installation Modification Item 1 of 1: AN/USN-3 (V) - / 0.000 Subtotal: Installation - / 0.000 - / 0.000 - / - - / - - / - - / - - Total Total Cost (Procurement + Support + Installation) 268.703 LI 2867 - Joint Precision Approach and Landing Sys... Navy 7.287 5.105 2.976 0.000 UNCLASSIFIED Page 4 of 6 2.976 6.080 30.437 P-1 Line #59 49.454 Continuing Volume 2 - 512 === page 593 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/USN-3 (V) MDAP/MAIS Code: Modification Item 1 of 1: AN/USN-3 (V) Manufacturer Information Manufacturer Name: NAWC WOLF Manufacturer Location: St Inigoes, MD Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2026 FY 2026 FY 2027 FY 2028 FY 2030 FY 2031 FY 2029 FY 2030 FY 2031 Contract Dates Apr 2029 Apr 2030 Apr 2031 Delivery Dates Apr 2030 Apr 2031 Apr 2032 Manufacturer Name: TBD FY 2029 Manufacturer Location: TBD Administrative Leadtime (in Months): 4 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Installation Information Method of Implementation: FMP:: Installation Name: LANTERNS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 2 / 1.410 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.410 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 2 / 1.410 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost / - - / - 2 / 1.410 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 1 1 - - - - - - - - - - - - - - - - - - - - - - 2 Out - - - - - - 1 1 - - - - - - - - - - - - - - - - - - - - - - 2 LI 2867 - Joint Precision Approach and Landing Sys... Navy UNCLASSIFIED Page 5 of 6 P-1 Line #59 Volume 2 - 513 === page 594 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2867 / Joint Precision Approach and Landing System(JPALS) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / AN/USN-3 (V) MDAP/MAIS Code: Modification Item 1 of 1: AN/USN-3 (V) Installation Information Method of Implementation: FMP:: Installation Name: AN/USN-3 (V)2 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.444 - / - 0 / 0.000 3 / 1.444 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.455 0 / 0.000 5 / 2.455 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 2.503 5 / 2.503 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 6.127 12 / 6.127 Total - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.444 5 / 2.455 17 / 8.630 25 / 12.529 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - 1 1 1 - 1 2 2 17 25 Out - - - - - - - - - - - - - - - - - - - - - - 1 1 1 - 1 2 2 17 25 Footnotes: (1) Inventory Objective is 25 LI 2867 - Joint Precision Approach and Landing Sys... Navy UNCLASSIFIED Page 6 of 6 P-1 Line #59 Volume 2 - 514 === page 595 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 385.615 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 385.615 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 385.615 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 42.326 60.058 54.487 0.000 54.487 76.364 55.041 61.570 - - - - - - - - 42.326 60.058 54.487 0.000 54.487 76.364 55.041 61.570 To FY 2031 Complete - Total - 62.724 Continuing - Continuing - 62.724 Continuing - Continuing - - - - - - - - - - 42.326 60.058 54.487 0.000 54.487 76.364 55.041 61.570 62.724 Continuing Continuing 1.042 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.345 - 0.680 - 0.680 0.580 0.427 0.586 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line item provides funding to procure Mission Planning workstations and associated Support Equipment, Software/Production Engineering Support, and Integrated Logistics Support (ILS) for the Naval Mission Planning Systems (NavMPS) family of systems. The NavMPS family of systems includes the Joint Mission Planning System-Maritime (JMPS-M), Collaborative Mission Planning Continuum (CMPC) formerly called Next Generation Naval Mission Planning System (NGNMPS), JMPS-E (Expeditionary), Electronic Kneeboard (EKB), Common Munitions Built-in-Test (BIT)/Reprogramming Equipment (CMBRE), Standardized Tester of Reprogrammable Munitions (STORM, formerly called "Next Generation CMBRE"), and Common Munitions Built-in-Test (BIT)/Reprogramming Equipment Cyber Enhanced (CMBRE CE) JMPS-M (Maritime) is the legacy automated mission planning system for Naval Aviation, currently supporting over 40 Type/Model/Series (T/M/S) U.S. Navy and Marine Corps aircraft and expeditionary forces. The JMPS-M program support includes platforms such as: F/A-18 A/B/C/D/E/F, EA-18G, CH-53K, Marine Helicopters, H-60 R/S, and P-8A. JMPS-M enables weapon system employment by providing the information and decision aids needed to rapidly plan aircraft, weapon or sensor missions, load mission data into aircraft and weapons, conduct mission rehearsal, and post mission analysis. The Naval Aviation's modern aircraft need data loaded from JMPS-M to fly their missions. The JMPS-M system procures hardware and software assets at all appropriate classification levels to support mission-planning requirements. The JMPS-M system is sun-setting in FY 2027 with a transition to CMPC. The Collaborative Mission Planning Continuum (CMPC) formerly called Next Generation Naval Mission Planning System (NGNMPS), will address critical capability gaps and deficiencies in the legacy JMPS that are required for modern 21st century integrated mission-centric and collaborative multi-domain mission planning, execution and analysis. The CMPC will begin replacing Naval Aviation's legacy JMPS no later than FY 2027 while also affordably leveraging prior investments across the systems of systems to deliver integrated and collaborative capability. The CMPC will address technological obsolescence while delivering enhanced capabilities to support the current Air Wing and the Air Wing of the future. The CMPC capability provides advanced multiple aircraft planning capabilities focused on emerging, high-threat mission areas. Current mission planning capabilities support individual aircraft and weapon initialization requirements. The emerging, near-peer threat environment demands a much more capable system that enables a team of aircraft to cooperate effectively across multiple mission areas, domains, and security levels. The CMPC will also leverage modernized architecture to provide revolutionary improvements in workflow, usability, cybersecurity. Additionally, CMPC will provide information and decision aids needed to rapidly plan/employ/maximize effectiveness of aircraft/weapon/sensor/payload mission plans. This functionality includes advanced pre-mission rehearsal/analysis, loading mission data into aircraft and weapons, dynamic replanning/retargeting against evolving threats in contested environments, and advanced post-mission debrief/ analysis. The CMPC will incorporate cross-domain solution capabilities. The CMPC system will also conduct work support advanced technology maturation, risk reduction activities, and system demonstrations supporting future mission planning needs for both USN and USMC users. These mission planning, mission execution, and mission analysis functions will be designed to meet the National Defense Strategy objectives. The CMPC will conduct preflight mission planning, data loading, rehearsals, mission execution and post mission analyses at all appropriate security classification levels. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 1 of 17 P-1 Line #60 Volume 2 - 515 === page 596 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A JMPS-E (Expeditionary) is a scalable, tailorable and collaborative web-based mission planning and execution monitoring tool for Marine Expeditionary Unit and Amphibious Squadron staffs embarked with each Amphibious Ready Group (ARG) and Expeditionary Strike Group (ESG). The EKB provides Naval Aviation with a scalable, rapidly deployable capability to support Department of War (DoW) digital transformation initiatives. The EKB is configured on a commercially available portable electronic device and contains digital flight information, aeronautical products, reference material, and flight planning tools to support aviation operations in land-based, littoral, and blue-water environments. The EKB also provides tactical mission planning and execution capabilities including tactical decision aids that support the range of Naval Aviation Enterprise (NAE) operations. The EKB has two baseline configurations - an unclassified Electronic Flight Bag (EFB) device and the Tactical Flight Bag (TFB) device, which is currently classified up to Secret after loading mission-specific software. The EFB's function is to support flight planning and execution while the TFB's function is to support tactical mission employment. The EKB effort addresses a high-priority fleet "paperless cockpit" initiative which reduces the number of printed paper-based products needed for in-flight use while also accommodating the need to store and display data to the operator necessary to execute training and tactical missions. EKB funding provides at least one operational EKB device per aircraft cockpit seat based on Primary Aircraft Authorization (PAA) requirements. The CMBRE system provides USN/USMC forces with the critical capability to perform built-in-test (BIT) and programming/reprogramming of various weapons both afloat and ashore. The CMBRE system operations afloat require the modernization of ammunition Magazine Operations (MAGOPS) in all aircraft carriers (CVN-68 and CVN-78 classes) as well as large-deck L-Class (LHA/LHD) amphibious assault ships; The MAGOPS capability enables safe BIT checks and programming/reprogramming of stores in shipboard magazines to support enhanced sortie generation requirements. The STORM/CMBRE CE is the follow-on replacement system for the legacy CMBRE System. The STORM/CMBRE CE system addresses legacy CMBRE end of life obsolescence issues while also modernizing the system into an affordable, lightweight, compact, modular design. The STORM/CMBRE CE system further supports USMC expeditionary mission requirements, mandatory cybersecurity protections and resilience, and data transfer speeds that are required to support air wing combat readiness. Further STORM/CMBRE CE supports advanced Net-Enabled Weapons across the enterprise that are required in support of the National Defense Strategy (NDS) to pace the emerging threat. The STORM/CMBRE CE system will affordably enhance mission readiness and security, generate improved flexibility, depth and capacity for existing and emerging aviation weapon capabilities during the conduct of ship, shore, and ship-to-shore operations in both conventional and Disaggregated Aviation Operating (DAO) environments. The STORM/CMBRE CE program is not experiencing cost growth, the increase is due to the transition from a Section 804 Middle Tier of Acquisition rapid prototyping to an ongoing program of record. The STORM/CMBRE CE Production Hardware Units replace the legacy CMBRE system and provides the USN/USMC the ability to perform built-in-test and programming/reprogramming of various weapons. Funding FY 2027 will continue the procurement of STORM/CMBRE CE products to meet mandatory cyber security requirements, affordably address obsolescence, and meet emergent operational requirements including support for Disaggregated Aviation Operations supporting the National Defense Strategy. STORM/CMBRE CE hardware will maintain mission readiness, fleet readiness, and affordable system sustainability. Increase in FY 2027 is due to continuation of program of record and associated procurement of production assets. STORM/CMBRE CE Production Engineering Support provides engineering production drawings, parts and assembly, as well as engineering change proposals / updates to the STORM/CMBRE CE system. Efforts include implementation of cybersecurity mandates as well as addressing emergent cybersecurity vulnerabilities. Increase in Engineering Support corresponds to additional required support for procurement buy in FY 2027. STORM/CMBRE CE Integrated Logistics Support provides technical documentation, training materials, and installation / operation instructions for the STORM/CMBRE CE system. The STORM/CMBRE CE Program documentation is compliant with cybersecurity mandates and Communications Tasking Orders for newly deployed platforms. Increase in Logistics Support corresponds to additional required support for procurement buy in FY 2027. STORM/CMBRE CE Production Acceptance Testing supports production acceptance testing of manufactured units prior to Fleet delivery. As aircraft and weapons become increasingly advanced, they will require increased access, quantity, processing analysis and fidelity of data to support mission planning, mission execution, dynamic mission replanning and mission analysis. These data requirements will require additional advanced processors, memory, storage, and servers. Mission Planning Seats refer to the computer workstations that employ the mission planning software. Program cost is not directly related to FY hardware quantity; software is a cost factor independent of FY hardware quantity and cost. Funding profile accounts for required four-year workstation refresh cycle to preclude aging/obsolete hardware and reduce failure rates, procure supporting emerging technology such as EKB (and STORM/CMBRE CE starting in FY 2024) to support advanced operational capabilities and address system obsolescence/cybersecurity requirements/mission readiness requirements, and support memory requirements for high-end mission planning capabilities. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 2 of 17 P-1 Line #60 Volume 2 - 516 === page 597 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In 4Q FY 2024, the CMPC and STORM/CMBRE CE completed the Section 804 Middle Tier of Acquisition rapid prototyping of the FY 2016 National Defense Authorization Act (NDAA), as amended in FY 2017 NDAA (codified at 10 U.S.C. sub sec 2302 note) to deliver CMPC and STORM/CMBRE CE capability to the Navy across multiple platforms. Funding in FY 2027 continues procurement of hardware supporting all Naval Mission Planning Activities. Prior to FY 2017, the EKB was funded in BLI 4268. [P5 / Multi Level Mission Planning]: Multi-level Mission Planning refers to a classified capability. Details are held at a higher classification. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 3 of 17 P-1 Line #60 Volume 2 - 517 === page 598 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Naval Mission Planning Systems P-5 2 / Standardized Tester of Reprogrammable Munitions (STORM) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 384.077 - / 40.155 - / 42.886 - / 34.390 - / 0.000 - / 34.390 / 1.538 - / 2.171 - / 17.172 - / 20.097 - / 0.000 - / 20.097 / 385.615 - / 42.326 - / 60.058 - / 54.487 - / 0.000 - / 54.487 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 provides funding to procure 750 Mission Planning Seats, 95 Expeditionary Planning Seats, EKB's, training assets, and other JMPS-M, JMPS-E, CMBRE MAGOPS, EFB/TFB, and CMPC support equipment; and continues the release of software enhancements based on fleet inputs, emerging technologies, cybersecurity mandates and associated logistics support. FY 2027 Mission Planning Seat procurement supports Naval Aviation platforms, particularly F/A-18, E/A-18G, H-53, H-1, V-22, and P-8 platform variants. Updated hardware is required to continue to meet mission planning operational requirements for complex platforms, which include F/A-18 (all variants) and EA-18G. Procurements, allocations, and deployments of mission planning hardware assets are made at all appropriate security classification levels necessary to support all Naval Aviation platforms. Additionally, funding provides for database and server systems with storage space capable of storing National Geospatial-Intelligence Agency (NGA) world-wide map, data imagery, and intelligence data with associated network hardware. This will provide the Fleet with the required storage for map data, Digital Terrain Elevation Data (DTED), imagery, and intelligence required to plan missions. FY 2027 continues modernization of legacy mission planning, execution, analysis software and hardware. Procurement funding continues modernization and upgrades of shipboard magazines which support CMBRE/STORM/CMBRE CE magazine operations (MAGOPS) on NIMITZ (CVN-68) and FORD (CVN-78) class aircraft carriers. The MAGOPS installations are baselined at a rate of two CVN MAGOPS mods/installs per year, based on ship availability. The STORM/CMBRE CE program is not experiencing cost growth, the increase is due to the transition from a Section 804 Middle Tier of Acquisition rapid prototyping to a program of record. The STORM/CMBRE CE program of record continues in FY 2027 to meet mandatory cyber security requirements, to affordably address obsolescence, and to meet emergent operational requirements including support for Disaggregated Aviation Operations supporting the National Defense Strategy. Funding in FY 2027 procures additional operational STORM/CMBRE CE hardware assets. FY 2027 also supports procurement of additional servers necessary to host CMPC software, additional computational capacity necessary to meet the needs of more complex CMPC software during the transition from legacy JMPS. The budget in FY 2027 includes the cost of the ship change documents to upgrade and install CMPC hardware on air capable and amphibious assault ships. Funding in FY 2027 supports the JMPS-E program for both hardware technical refreshment and software modernization. Lastly, funding in FY 2027 supports; on cycle hardware refreshment of EFB/TFB assets to prevent obsolescence. The EFB/TFB funding provides at least one operational EKB device per aircraft cockpit seat based on Primary Aircraft Authorization (PAA) requirements. Items to be funded in this line include: Workstation Components - Tactical computer hardware, at all appropriate classification levels, is procured through a non-developmental item acquisition strategy. Tactical computer equipment is used to plan and analyze tactical aircraft missions and aircraft routes under various mission configurations, operational threat environments, and classifications. Primary outputs are tasking orders, Courses of Actions (COAs), Route Plans, Munitions / Weapons Plans, and Navigation aids and mission essential data loads for mission execution. Mission Planning hardware consist of aircraft unique data transfer devices and interfaces, Memory Data Loader Receptacles (MDLR) Small Computer Standard Interface (SCSI) (MDLR-S), EKB, STORM/CMBRE CE, Ogden Data Device Ethernet Crypto (ODD-EC), Data Storage Unit Receptacle SCSI (DSUR-S), Mission Planning servers (to host software and for data storage), network hubs, printers, fleet training school workstations, training assets, and other peripheral devices for USN/USNR/USMC/ USMCR missions. The JMPS and CMPC Authority to Operate (ATO) requires compliance with Naval Network Warfare Command (NNWC)-issued Information Assurance (IA) mandates and Communications Tasking Orders (CTOs). EKB components - The EKB mobile computing devices are procured as commercial-off-the-shelf mobile computing devices. Funding also supports procurement of software licenses as well as deployment of software applications to fleet users. STORM/CMBRE CE Components - Funding in FY 2027 continues procurement of operationally deployable STORM/CMBRE CE production units. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 4 of 17 P-1 Line #60 Volume 2 - 518 === page 599 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 9: Aviation Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Software/Production Engineering Support - The JMPS-M, CMPC, EKB, and STORM/CMBRE CE programs produce software releases via evolutionary and agile development processes. These releases contain enhancements based on fleet inputs and technology improvements at all appropriate classification levels. The product releases also contain changes required to retain compatibility with supported platforms, associated weapons, and threat and imagery databases. Software releases are independent of hardware buys. This cost element includes production support services, engineering support services, independent verification and validation test and acceptance, site activation, IA compliance and quality assurance efforts, to include those associated with the software pipeline. Integrated Logistics Support - The JMPS-M and CMPC programs conduct site surveys, prepares site installation drawings, conduct on-site engineering, and perform logistics evaluations for installations and delivery systems to ensure compliance with the specified configuration. This cost element includes the production/delivery of technical documentation, training materials such as OPNOTES, installation instructions and user manuals required for the fielding and operation of JMPS-M and CMPC products. ILS is a cost factor independent of FY hardware quantity and cost. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 5 of 17 P-1 Line #60 Volume 2 - 519 === page 600 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 40.155 42.886 34.390 0.000 34.390 - Gross/Weapon System Cost ($ in Millions) 384.077 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 384.077 Plus CY Advance Procurement ($ in Millions) - - - - - 40.155 42.886 34.390 0.000 34.390 - Total Obligation Authority ($ in Millions) 384.077 FY 2027 Total - - - - - 40.155 42.886 34.390 0.000 34.390 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - Hardware Cost Recurring Cost 1.1.1) S7403 MISSION PLANNING (†) (1) SEAT 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM SEATS 3,898.37 15,773 61.489 3,146.00 450 1.416 3,146.67 150 0.472 3,146.00 300 0.944 2,938.55 537 1.578 3,146.00 140 0.440 - - 42.106 - - 2.025 - - 1.186 - - - - 12.051 - - - 15.013 - - - 0.000 5,850.00 930 5.441 5,850.00 95 0.556 - - 1.840 0.319 - - - 3.777 - - 12.798 - - - 0.000 - - 0.000 5,850.00 1,000 5.850 - - 0.000 5,850.00 95 0.556 - - 0.000 - - 0.558 - - 0.000 0.180 - - 0.049 - - - 5.368 - - 3.754 - - 11.514 - - 9.417 - - - 0.000 5,850.00 1,000 5.850 5,850.00 95 0.556 - - 0.558 0.000 - - 0.049 - 0.000 - - 3.754 - 0.000 - - 9.417 (†) (2) 1.1.3) S7408 EXPEDITIONARY WARFARE PLANNING SEAT (†) (3) 1.1.4) S7850 JMPS-M Support Equipment (4) 1.1.5) S7851 JMPS-E Support Equipment (5) 1.1.6) S7412 CMBRE MAGOPS (6) 1.1.7) S7411 Collaborative Mission Planning Continuum (7) LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 6 of 17 P-1 Line #60 Volume 2 - 520 === page 601 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) 1.1.8) S7853 EFB/TFB FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - - 6.514 - - 3.277 - - 3.298 - - 3.304 - - 0.000 - - 3.304 - - 8.247 - - 6.389 - - 5.987 - - 3.588 - - 0.000 - - 3.588 - - 148.656 - - 31.385 - - 34.184 - - 27.076 - - 0.000 - - 27.076 - - 148.656 - - 31.385 - - 34.184 - - 27.076 - - 0.000 - - 27.076 2.1) S7820 Other Costs - - 152.015 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) S7830 JMPS Software/Production - - 57.669 - - 3.059 - - 1.938 - - 0.538 - - 0.000 - - 0.538 - - 22.018 - - 1.302 - - 0.735 - - 0.216 - - 0.000 - - 0.216 - - 1.947 - - 2.447 - - 3.674 - - 3.920 - - 0.000 - - 3.920 - - 0.877 - - 1.033 - - 1.528 - - 1.805 - - 0.000 - - 1.805 - - 0.388 - - 0.412 - - 0.372 - - 0.377 - - 0.000 - - 0.377 - - 0.099 - - 0.101 - - 0.095 - - 0.094 - - 0.000 - - 0.094 - - 0.306 - - 0.312 - - 0.275 - - 0.279 - - 0.000 - - 0.279 - - 0.102 - - 0.104 - - 0.085 - - 0.085 - - 0.000 - - 0.085 Subtotal: Support Cost - - 235.421 - - 8.770 - - 8.702 - - 7.314 - - 0.000 - - 7.314 Gross/Weapon System Cost - - 384.077 - - 40.155 - - 42.886 - - 34.390 - - 0.000 - - 34.390 Support Equipment 1.1.9) Multi Level Mission Planning (8) (9) Subtotal: Recurring Cost Subtotal: Hardware Hardware Cost Support Cost Engineering Support (10) 2.3) S7800 JMPS Integrated Logistics Support (11) 2.4) CMPC Software/ Production Engineering Support (12) 2.5) CMPC Integrated Logistics Support (13) 2.6) CMBRE MAGOPS Production Engineering Support (14) 2.7) CMBRE MAGOPS Integrated Logistics Support (15) 2.8) EFB/TFB Production Engineering Support (16) 2.9) EFB/TFB Integrated Logistics Support (†) (17) indicates the presence of a P-5a Footnotes: LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 7 of 17 P-1 Line #60 Volume 2 - 521 === page 602 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems MDAP/MAIS Code: (1) 1.1.1) S7403 Mission Planning Seat - Procures JMPS-M laptops annually as a component of the JMPS-M Mission Planning Seat. JMPS laptop quantities are currently based on Fleet demand and number of Mission Planning Environments/aircraft supported (over 40 T/M/S) which is validated by Commander Naval Air Forces (CNAF). (2) 1.1.2) Collaborative Mission Planning Continuum Seats - Procures CMPC computers annually as a component of the Mission Planning Seat. Computer quantities are currently based on Fleet demand and number of Mission Planning Environments/aircraft supported which is validated by CNAF. FY 2026 & 2027 unit costs increases are driven by the additional processing, storage, and memory requirements associated with the collaborative mission planning requirements associated with defeating a peer / near-peer adversary. Processor and memory requirements have expanded to accommodate mapping requirements. Storage requirements have increased costs because of the need to retain larger data libraries associated with advanced mission planning capabilities. Likewise, the requirement for FIPS 140-3 (provides additional cybersecurity and data at rest protections) self-encrypting drives (including key management) have increased unit costs. Lastly, very high-capacity batteries have increased costs in order to meet the 6 - 10 hour operating time, without external power sources, to satisfy USN and USMC expeditionary operation requirements. Mission Planning Seat candidates are determined by Fleet requirements and COTS/Military specification software/hardware compatibility. The Mission Planning hardware contract is re-competed every two years (one base year, one option year) where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. (3) 1.1.3) S7408 FY 2027 unit cost and total cost only reflect Expeditionary Warfare Planning Seat procurement. Quantities reflect Expeditionary Warfare Planning Seat procurement. Quantities adjusted to meet Fleet demand. The Expeditionary Warfare Planning Seat candidates are determined by Fleet requirements and COTS/Military spec software/hardware compatibility. FY 2026 & 2027 unit costs increases are driven by the additional processing, storage, and memory requirements associated with the collaborative mission planning requirements associated with defeating a peer / near-peer adversary. Processor and memory requirements have expanded to accommodate mapping requirements. Storage requirements have increased costs because of the need to retain larger data libraries associated with advanced mission planning capabilities. Likewise, the requirement for FIPS 140-3 (provides additional cybersecurity and data at rest protections) self-encrypting drives (including key management) have increased unit costs. Lastly, very high-capacity batteries have increased costs in order to meet the 6 - 10 hour operating time, without external power sources, to satisfy USN and USMC expeditionary operation requirements. The Mission Planning hardware contract is re-competed every two years (one base year, one option year) where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. (4) 1.1.4) S7850 JMPS-M Support Equipment - Support Equipment includes storage devices, network hubs, printers, initial fleet training school workstations, Advanced Data Loader Receptacles, Electronic Kneeboards (EKB), training assets, and other peripheral devices for USN/USNR/USMC/USMCR missions. Support Equipment adjusted to meet Fleet demand and number of Mission Planning Environments/ aircraft supported (over 40 T/M/S). (5) (6) 1.1.5) S7851 FY 2027 funding accounts for the JMPS-E software modernization and on-cycle hardware refresh to prevent obsolescence and associated support equipment. 1.1.6) S7412 CMBRE MAGOPS is a fleet requirement to increase weapons maintenance and support throughput rates to meet Carrier Air Wing Sortie Generation Rate requirements in support of the National Defense Strategy, driving relocation of CMBRE stations to CVN Armored Box Magazines. Funds are required to outfit the next available CVN for CMBRE MAGOPS, and upgrade the CVN Armored Box Magazines in support of CMBRE station relocation. (7) 1.1.7) Collaborative Mission Planning Continuum- CMPC is the replacement to JMPS, which is the legacy automated mission planning system for Naval Aviation, supporting U.S. Navy and Marine Corps aircraft and expeditionary forces. The increased processing requirements of CMPC drives the need for the deployment of high-end computing hardware, increased storage requirements, as well as improved network connectivity. Funding also supports installations at land-based Naval / Marine Corps Air Stations as well as shipboard installation; ship changes will be needed to support installation of CMPC on Naval ships such as CVN/LHA/LHD/LCS/DDG's. (8) 1.1.8) S7853 EFB/TFB funding provides at least one operational EKB device per aircraft cockpit seat based on Primary Aircraft Authorization (PAA) requirements. Funding increase in FY 2027 due to continued EFB/TFB procurement and deployment. (9) 1.1.9) Multi-level Mission Planning - details of this capability are held at a higher classification. Item included in overall Naval Mission Planning Systems budget from FY24 and out to increase transparency. (10) 2.2) S7830 JMPS Software/Production Engineering Support- Funds modernization/updates to Mission Planning Environments supporting over 40 T/M/S aircraft, including support of cybersecurity mandates. Funding ramp-down accounts for the transition from JMPS-M to CMPC. (11) 2.3) S7800 JMPS Integrated Logistics Support- Provides JMPS technical documentation, training materials and installation instructions that are compliant with cyber security mandates and Communications Tasking Orders (CTOs) for newly deployed platforms. Funding ramp-down accounts for the transition from JMPS-M to CMPC. (12) 2.4) CMPC Software/Production Engineering- The funding ramp up supports the transition to CMPC for U.S. Navy and Marine Corps aircraft and expeditionary forces, supports modernized architecture / aircraft, and supports cyber security mandates. CMPC SW/PES support cost increases from FY 2026 to FY 2027 are due to increased production capacity required to support Program of Record efforts and support for additional aircraft and weapons transitioning from JMPS-M to CMPC. Efforts include production support services, engineering support services, independent verification and validation test and acceptance, site activation, IA compliance and quality assurance efforts, to include those associated with the software pipeline LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 8 of 17 P-1 Line #60 Volume 2 - 522 === page 603 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems MDAP/MAIS Code: (13) 2.5) CMPC Integrated Logistics Support- Provides technical documentation, training materials and installation instructions that are compliant with cyber security mandates and Communications Tasking Orders (CTOs) for newly deployed platforms and software. CMPC ILS support cost increases from FY 2026 to FY 2027 are due to continued Program of Record ramp up and support required to field CMPC to additional sites/users as aircraft and weapons transition from legacy JMPS-M to CMPC. Efforts include site surveys, prepares site installation drawings, conducting on-site engineering, and perform logistics evaluations for installations and delivery systems to ensure compliance with the specified configuration. This includes the production and delivery of technical documentation and training materials such as OPNOTES, installation instructions and user manuals required during the fielding of CMPC products. (14) 2.6) CMBRE MAGOPS Production Engineering Support- Funding supports engineering drawings and ship change documents for modification and installation of the power connections for the CMBRE units in the CVN Armored Box Magazines. (15) 2.7) CMBRE MAGOPS Integrated Logistics Support- Funding provides technical documentation, training materials, and installation / operations instructions for CMBRE units when conducting magazine operations. (16) 2.8) EFB/TFB Production Engineering Support- Funding supports modernization and updates to EFB / TFB mobile computing devices. Support includes compliance with cybersecurity mandates as well as addressing emergent cybersecurity vulnerabilities. (17) 2.9) EFB/TFB Integrated Logistics Support- Funding supports modernization, updates, and distribution EFB / TFB hardware and software products. Additionally, funding supports technical documentation, operational documentation, and training materials for EFB / TFB that are compliant with cyber security mandates and Communications Tasking Orders (CTOs) for newly deployed platforms and software. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 9 of 17 P-1 Line #60 Volume 2 - 523 === page 604 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 FY Contractor and Location 1.1.1) S7403 MISSION PLANNING SEAT 2023 GNOSTECH, LLC / WARMINSTER PA C / FFP NAVAIRHQ Feb 2023 Feb 2023 750 2,037.00 N Oct 2021 1.1.1) S7403 MISSION PLANNING SEAT 2024 GNOSTECH, LLC / WARMINSTER PA C / TBD NAVAIRHQ Jul 2024 Sep 2024 600 3,146.00 N Oct 2023 1.1.1) S7403 MISSION PLANNING SEAT 2025 GNOSTECH, LLC / WARMINSTER PA C / TBD NAVAIRHQ Mar 2025 May 2025 450 3,146.00 N Oct 2023 GNOSTECH, LLC / WARMINSTER PA C / TBD NAVAIRHQ Jul 2024 Oct 2024 150 3,146.00 Y Oct 2023 GNOSTECH, LLC / WARMINSTER PA C / TBD NAVAIRHQ Mar 2025 Jun 2025 300 3,146.00 Y Oct 2023 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM (†) SEATS 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM (†) SEATS 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM (†) SEATS 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM (†) SEATS (†) Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems 2024 (18) 2025 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2026 (19) TBD / TBD C / TBD NAVAIRHQ Mar 2026 Jun 2026 930 5,850.00 Y Oct 2025 2027 (20) TBD / TBD C / TBD NAVAIRHQ Mar 2027 Jun 2027 1,000 5,850.00 Y Oct 2025 1.1.3) S7408 EXPEDITIONARY WARFARE PLANNING SEAT 2023 GNOSTECH, LLC / WARMINSTER PA C / FFP NAVAIRHQ Feb 2023 Apr 2023 138 2,037.00 N Oct 2021 1.1.3) S7408 EXPEDITIONARY WARFARE PLANNING SEAT 2025 GNOSTECH, LLC / WARMINSTER PA C / TBD NAVAIRHQ Mar 2025 May 2025 140 3,146.00 N Oct 2023 1.1.3) S7408 EXPEDITIONARY WARFARE PLANNING SEAT 2026 (21) TBD / TBD C / TBD NAVAIRHQ Mar 2026 Jun 2026 95 5,850.00 N Oct 2025 1.1.3) S7408 EXPEDITIONARY WARFARE PLANNING SEAT 2027 (22) TBD / TBD C / TBD NAVAIRHQ Mar 2027 Jun 2027 95 5,850.00 N Oct 2025 indicates the presence of a P-21 Footnotes: (18) This contract consists of a base year (FY 2024) and option year (FY 2025). Mission Planning laptop contract is re-competed every two years where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. Manufacturer will be updated from TBD once a contractor has been selected. (19) This contract consists of a base year (FY 2026) and option year (FY 2027). Mission Planning laptop contract is re-competed every two years where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. Manufacturer will be updated from TBD once a contractor has been selected. (20) This contract consists of a base year (FY 2026) and option year (FY 2027). Mission Planning laptop contract is re-competed every two years where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. Manufacturer will be updated from TBD once a contractor has been selected. (21) This contract consists of a base year (FY 2026) and option year (FY 2027). Mission Planning laptop contract is re-competed every two years where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. Manufacturer will be updated from TBD once a contractor has been selected. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 10 of 17 P-1 Line #60 Volume 2 - 524 === page 605 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems (22) This contract consists of a base year (FY 2026) and option year (FY 2027). Mission Planning laptop contract is re-competed every two years where pricing and fleet requirements are evaluated to ensure they meet fleet requirements while remaining cost effective. Manufacturer will be updated from TBD once a contractor has been selected. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 11 of 17 P-1 Line #60 Volume 2 - 525 === page 606 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM SEATS N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2024 NAVY 150 0 150 1 2025 NAVY 300 0 300 A - - - 150 2 2026 NAVY 930 0 930 930 2 2027 NAVY 1,000 0 1,000 1,000 300 O C T LI 2876 - Naval Mission Planning Systems Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 526 === page 607 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM SEATS 1 2024 NAVY 150 0 150 1 2025 NAVY 300 0 300 2 2026 NAVY 930 0 930 2 2027 NAVY 1,000 0 1,000 Fiscal Year 2026 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 150 0 A - - - 300 0 A - - - 930 0 1,000 O C T LI 2876 - Naval Mission Planning Systems Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 527 === page 608 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T 1.1.2) COLLABORATIVE MISSION PLANNING CONTINUUM SEATS N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2024 NAVY 150 150 0 0 1 2025 NAVY 300 300 0 0 2 2026 NAVY 930 930 0 2 2027 NAVY 1,000 0 1,000 0 A O C T LI 2876 - Naval Mission Planning Systems Navy N O V D E C J A N F E B M A R A P R M A Y 1,000 J U N 0 J U L A U G UNCLASSIFIED Page 14 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 528 === page 609 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Naval Mission Planning Systems Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GNOSTECH, LLC WARMINSTER PA TBD 2 TBD - TBD TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 6 3 9 0 6 3 9 0 6 3 9 0 6 3 9 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 15 of 17 P-1 Line #60 Volume 2 - 529 === page 610 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Standardized Tester of Reprogrammable Munitions (STORM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.538 2.171 17.172 20.097 0.000 20.097 - - - - - - 1.538 2.171 17.172 20.097 0.000 20.097 - - - - - - 1.538 2.171 17.172 20.097 0.000 20.097 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - STORM Cost Recurring Cost 1.1.1) S7852 STORM/CMBRE CE Production Hardware - - 0.578 - - 1.198 - - 11.040 - - 11.087 - - 0.000 - - 11.087 - - 0.578 - - 1.198 - - 11.040 - - 11.087 - - 0.000 - - 11.087 - - 0.578 - - 1.198 - - 11.040 - - 11.087 - - 0.000 - - 11.087 - - 0.750 - - 0.760 - - 2.933 - - 4.412 - - 0.000 - - 4.412 - - 0.210 - - 0.213 - - 2.970 - - 4.360 - - 0.000 - - 4.360 - - 0.000 - - 0.000 - - 0.229 - - 0.238 - - 0.000 - - 0.238 Subtotal: Support - STORM Cost - - 0.960 - - 0.973 - - 6.132 - - 9.010 - - 0.000 - - 9.010 Gross/Weapon System Cost - - 1.538 - - 2.171 - - 17.172 - - 20.097 - - 0.000 - - 20.097 Units (23) Subtotal: Recurring Cost Subtotal: Hardware STORM Cost Support - STORM Cost 2.1) STORM/CMBRE CE Production Engineering Support (24) 2.2) STORM/CMBRE CE Integrated Logistics Support (25) 2.3) STORM/CMBRE CE Production Acceptance Testing (26) LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 16 of 17 P-1 Line #60 Volume 2 - 530 === page 611 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 9 P-1 Line Item Number / Title: 2876 / Naval Mission Planning Systems ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Standardized Tester of Reprogrammable Munitions (STORM) MDAP/MAIS Code: Footnotes: (23) Set 2 (1.1.1) S7852 Standardized Tester of Reprogrammable Munitions (STORM)/CMBRE CE Production Hardware Units replaces the legacy CMBRE system and provides the USN/USMC the ability to perform built-in-test and programming/reprogramming of various weapons. Funding starting in FY 2027 will procure additional STORM/CMBRE CE products to meet mandatory cyber security requirements, affordably address obsolescence, and meet emergent operational requirements including support for Distributed Aviation Operations supporting the National Defense Strategy. STORM/CMBRE CE hardware will maintain mission readiness, fleet readiness, and affordable system sustainability. Increase in FY 2027 is due to ongoing program of record and associated procurements of production assets. This cost element is not experiencing cost growth, the increase is due to the transition of STORM/CMBRE CE from a Section 804 Middle Tier of acquisition rapid prototyping to a program of record. (24) Set 2 (2.1) STORM/CMBRE CE Production Engineering Support- Funding supports engineering production drawings, parts and assembly, as well as engineering change proposals / updates to the STORM/ CMBRE CE system. Efforts include implementation of cybersecurity mandates as well as addressing emergent cybersecurity vulnerabilities. Increase in Engineering Support corresponds to additional required support for procurement buy in FY27. This cost element is not experiencing cost growth, the increase is due to the transition of STORM/CMBRE CE from a Section 804 Middle Tier of acquisition rapid prototyping to a program of record. (25) Set 2 (2.2) STORM/CMBRE CE Integrated Logistics Support- Provides technical documentation, training materials, and installation / operation instructions for the STORM/CMBRE CE system. The STORM/ CMBRE CE Program documentation is compliant with cybersecurity mandates and Communications Tasking Orders for newly deployed platforms. Increase in Logistics Support corresponds to additional required support for procurement buy in FY27. This cost element is not experiencing cost growth, the increase is due to the transition of STORM/CMBRE CE from a Section 804 Middle Tier of acquisition rapid prototyping to a program of record. (26) STORM/CMBRE CE Production Acceptance Testing- Funding supports production acceptance testing of manufactured units prior to Fleet delivery. LI 2876 - Naval Mission Planning Systems Navy UNCLASSIFIED Page 17 of 17 P-1 Line #60 Volume 2 - 531 === page 612 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 532 === page 613 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2900 / Maritime Integrated Broadcast System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 96.910 8.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - - 96.910 8.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - - 96.910 8.479 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.021 Continuing Total 105.389 105.389 105.389 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.235 0.015 - - - 0.003 0.005 0.025 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding for Maritime Integrated Broadcast System (MIBS) has been realigned out of line item 2900 into line item 2361 starting in FY 2026. This is to consolidate the number of program elements (PE) and budget line items (BLI) to group technology projects to allow flexibility fostering innovation and efficiency. PE/BLI consolidation meets the DoD Implementation Plan from the Commission on PPBE Final Report. The MIBS program delivers Integrated Broadcast Service (IBS) data to operational and tactical decision makers aboard United States Navy surface ships, shore headquarters, and other joint platforms. MIBS provides the Navy with the capability to receive and deliver near real time, Over the Air (OTA) IBS data, enhancing the Common Operation Picture (COP) supporting operations in all warfare areas. Including Ballistic Missile Defense (BMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASUW), Undersea Warfare (UW), Electronic Warfare (EW) and track location of red and blue forces to warfighters at the tactical edge, regardless of Emission Control (EMCON) posture. MIBS provides essential support to the Over the Horizon-Targeting (OTH-T) mission and supports closure of the kill chain in a denied environment. This budget will provide a technical refresh of the Joint Tactical Terminal - Maritime (JTT-M) systems. The Joint Tactical Terminal - Maritime Evolved (JTT-ME) system replaces an End of Life (EoL) JTTSenior terminals and infrastructure with a modern, secure, network enabled infrastructure that allows flexibility for future radios/waveforms. This system is formally specified by Fleet Commanders as a threshold capability for global Maritime Command, Control and Communications in a Distributed Maritime Environment to execute current Warfighting plans and is required for National Command and Control capability. The MIBS program will replace the End of Life (EoL) JTT-Senior radio (JTT-M) that has been in sustainment for 20+ years. LI 2900 - Maritime Integrated Broadcast System Navy UNCLASSIFIED Page 1 of 4 P-1 Line #61 Volume 2 - 533 === page 614 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2900 / Maritime Integrated Broadcast System Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Maritime Integrated Broadcast System P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 96.910 - / 8.479 - / 96.910 - / 8.479 - / / 0.000 - / / 0.000 - / / 0.000 - / / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding for Maritime Integrated Broadcast System (MIBS) has been realigned out of line item 2900 into line item 2361 starting in FY 2026. This is to consolidate the number of program elements (PE) and budget line items (BLI) to group technology projects to allow flexibility fostering innovation and efficiency. PE/BLI consolidation meets the DoD Implementation Plan from the Commission on PPBE Final Report. LI 2900 - Maritime Integrated Broadcast System Navy UNCLASSIFIED Page 2 of 4 P-1 Line #61 Volume 2 - 534 === page 615 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2900 / Maritime Integrated Broadcast System Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Maritime Integrated Broadcast System FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 1) Maritime Integrated Broadcast System (MIBS) - Procurement 1.1) Consolidated Prior Year A - - - - - - - - - - - - - - 23 4.714 - - - - - - - - - - - - - - 4.714 - - - - - - - - - - - - 6.576 - - 3.270 - - - - - - - - - - - - - 1.275 - - 0.290 - - - - - - - - - - - - - 7.851 - - 3.560 - - - - - - - - - - - - - - 0.380 - - 0.205 - - - - - - - - - - - - Subtotal: 3) Support - - 0.380 - - 0.205 - - - - - - - - - - - - Total - - 96.910 - - 8.479 - - - - - - - - - - - - Requirements (1) 1.2) Joint Tactical Terminal - Maritime Evolved (JTT-ME) - - 82.350 32 6.329 - - 88.679 - - - - A 197.781 204.959 (2)(†) Subtotal: 1) Maritime Integrated Broadcast System (MIBS) Procurement 2) Installations 2.1) JTT-ME Installations A (3) 2.2) JTT-ME DSA (4) A Subtotal: 2) Installations 3) Support 3.1) Production Support (5) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) Consolidated Prior Year Requirements: PY requirements include JTT-ME terminals, Quad Diversity Combiner, Security Appliance, Power systems, Rack Mounted Computer, Monitor, mouse/keyboard and associated wiring. 1.2) Joint Tactical Terminal - Maritime Evolved (JTT-ME): Funding for the following line item has been realigned out of LI 2900 into LI 2361 as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026: Maritime Integrated Broadcast System (MIBS). (3) (4) (5) 2.1) JTT-ME Installations: Funding for the following line item has been realigned out of LI 2900 into LI 2361 as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026: Maritime Integrated Broadcast System (MIBS). 2.2) JTT-ME DSA: Funding for the following line item has been realigned out of LI 2900 into LI 2361 as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026: Maritime Integrated Broadcast System (MIBS). 3.1) Production Support: Funding for the following line item has been realigned out of LI 2900 into LI 2361 as part of Other Procurement, Navy Line Item-Consolidation starting in FY 2026: Maritime Integrated Broadcast System (MIBS). LI 2900 - Maritime Integrated Broadcast System Navy UNCLASSIFIED Page 3 of 4 P-1 Line #61 Volume 2 - 535 === page 616 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 2900 / Maritime Integrated Broadcast System Method/Type or Funding Vehicle C / CPFF Aggregated Items: Maritime Integrated Broadcast System Location of PCO Award Date Date of First Delivery San Diego, CA Jan 2025 Jan 2026 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 1) Maritime Integrated Broadcast System (MIBS) - Procurement 1.2) Joint Tactical Terminal Maritime Evolved (JTT-ME) (2) 2025 L3Harris Technologies / San Diego, CA LI 2900 - Maritime Integrated Broadcast System Navy UNCLASSIFIED Page 4 of 4 P-1 Line #61 23 204.959 Y Volume 2 - 536 === page 617 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604231N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 345.370 345.370 345.370 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 66.470 64.901 48.262 0.000 48.262 51.090 51.915 52.990 - - - - - - - - 66.470 64.901 48.262 0.000 48.262 51.090 51.915 52.990 To FY 2031 Complete - Total - 54.061 Continuing - Continuing - 54.061 Continuing - Continuing - - - - - - - - - - 66.470 64.901 48.262 0.000 48.262 51.090 51.915 52.990 54.061 Continuing Continuing 3.748 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.348 0.067 2.839 - 2.839 8.976 7.169 4.378 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Tactical/Mobile (TacMobile) Command, Control, Communications, Computers, and Intelligence (C4I) Systems: TacMobile is the ground station program that supports P-8A Poseidon and MQ-4C Triton pre and post-flight C4I requirements and Inflight Command and Control support. These ground stations provide critical reach-back capabilities between the airborne platforms and the Maritime Intelligence, Surveillance, and Reconnaissance (ISR) Enterprise/ decision makers. TacMobile consists of fixed-site Tactical Operations Centers (TOCs), Mobile Tactical Operations Centers (MTOCs), and Fly Away Kits (FAKs). TOCs are located at major Maritime Patrol and Reconnaissance Aircraft (MPRA) Continental United States (CONUS) and deployment hub sites. MTOCs are scalable, mobile versions of the TOC used for extended contingency operations at remote forward operating bases, while FAKs are small transportable systems that support emergent short term detachments for limited duration. Total program of record consists of: a) 6 TOCs: Systems located at Naval Air Station (NAS) Jacksonville, Florida; NAS Sigonella, Italy; Marine Corps Base Hawaii (MCBH) Kaneohe Bay, Hawaii; NAS Whidbey Island, Washington; Naval Air Facility (NAF) Kadena, Japan; and Isa Air Base Bahrain. b) 12 MTOCs: 6 systems home ported at NAS Jacksonville, Florida and 6 systems at NAS Whidbey Island, Washington. c) 12 FAKs: Fly Away Kits consist of a rotatable pool that is assigned to Tactical Operations Control Squadron (TOCRON) 11 in NAS Jacksonville, Florida, and to TOCRON 10 in NAS Whidbey Island, Washington. d) 1 Schoolhouse located at the Center for Naval Air Technical Training Unit (CNATT-U) NAS Jacksonville, Florida. The TacMobile program is comprised of 23 subsystems that utilize an evolutionary development strategy consisting of incremental upgrades synchronized to match increased P-8A capabilities while retaining current functionality and readiness. Incremental upgrades and tech refreshes are planned to support the Maritime Patrol and Reconnaissance Force (MPRF) Family of Systems aircraft advances. TacMobile Acquisition strategy is to modernize the Computers, Communications, Command, Control, and Intelligence (C4I) architecture that implements a modular system design approach allowing for rapid upgrades to system capabilities to keep pace with evolving operational environments. The modular design approach also allows for the fielding of incremental capability packages (CP-1, CP-2, CP-3). LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 1 of 14 P-1 Line #62 Volume 2 - 537 === page 618 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604231N Line Item MDAP/MAIS Code: N/A TacMobile 2.1.2 Tech Refresh upgrades the Communications equipment in order to address End-of-Life (EOL) issues, Interim P-8A Ground Station (PGS), and TacMobile Capability Packages over the Future Years Defense Program (FYDP). The communications equipment includes Ultra High Frequency (UHF)/Very High Frequency (VHF) satellite radios and Super High Frequency (SHF) voice and data communications systems. Tech refresh also includes Tactical Mobile Advanced Airborne Sensor (TMAAS) Interface Kit (TIK) to support Advanced Airborne Sensor (AAS) operations worldwide and Tactical Mobile Acoustic Support System (TacMASS) upgrade to support Post Flight Analysis of Acoustic Intelligence Data. TacMobile Tech Refresh 2.1.3 is Capability Package 1 (CP-1), which modernizes the Secret domain C4I architecture, leverages 2.1.2 Tech Refresh equipment, leveraging applicable P-8A Ground Station (PGS) components, and provides risk reduction for TacMobile Increment 3 at non-PGS units. CP-1 modernizes the C4I server stack using converged network attached storage which increases data storage and improves maintainability while also reducing Size, Weight, and Power (SWaP). Implementing a services-based architecture that leverages Platform as a Service (PaaS) and Software as a Service (SaaS) technology using containerized applications, this modernization facilitates speed to capability, increased agility and reliability, and better quality and maintainability of TacMobile software with improved Cyber resilience. Additionally, Tech Refresh 2.1.3 modernizes legacy Fly Away Kits (FAK) to maintain alignment with P-8A aircraft Fleet Release modernization. Funding for PGS is aligned under Program Element (PE) 0204251N and will be executed by Budget Submitting Office (BSO) N00019 PEO Air ASW, Assault and Special Mission Programs to support the introduction of the P-8A Increment 3 configuration. Concurrent with ongoing TacMobile Inc 2.1 sustainment efforts, the interim PGS will support the P-8A Inc 3 testing through Initial Operating Capability (IOC) and initial deployments until the final follow on TacMobile Inc 3 system is fielded. The full TacMobile Inc 3 systems will leverage the PGS architecture with a focus on increased mobility (Size, Weight, Power and Cost (SWaP-C)) and cloud-based architecture at multi-security classification levels that meet TacMobile Inc 3's full Capability Production Document (CPD) requirements. P-8A Inc 3 Ground Station (PGS): The PGS is the interim solution that supports the P-8 Increment 3 ECP-6 & 7 system design. ECP 6/7 is a significant Hardware & Software modification that includes Combat System architecture improvements, Anti-Submarine Warfare (ASW) and Anti Surface Warfare (ASuW) sensor improvements, SATCOM capability upgrades, an ASuW Net Enabled Weapon, and a HigherThan-Secret security capability. PGS provides the timely support to P-8A ECP 6/7 configured aircraft to conduct preflight mission planning, operate within SECRET and Top Secret/Sensitive Compartmented Information (TS/SCI) enclaves, perform in-flight Command and Control (C2) mission support, and conduct post flight debriefing and sensor data dissemination. This effort also funds fleet prioritized requirements as a part of the Rapid Capability Insertion (RCI) process to pace the global ASW and ASuW threats and address reliability improvements, obsolescence, periodic technology insertion, correction of deficiencies, including funds to implement various changes at Tactical Operations Centers (TOCs) and Mobile Tactical Operations Centers (MTOCs) to improve systems reliability and cyber security. Deployable Joint Command and Control (DJC2) (JH500): DJC2 is a rapidly deployable, self-contained, and network-enabled system that provides mission command capabilities in expeditionary environments, such as disaster relief or forward-deployed operations. It enables commanders to set up a fully functional, secure, and powered operations center anywhere in the world within 6-24 hours in direct support of Global Response Force (GRF) and emerging Fleet requirements leveraging DJC2's Fly Away Kits (FAKs) to meet mission requirements and fill capability gaps. Utilizing a fielded DJC2 system, the commander and staff can securely communicate across the world, send and receive information across five different computer networks (including secure networks and the Internet), participate in video teleconferences with remote locations, and use a fully integrated command and control/collaboration software tool suite to plan and execute missions. The JROC-approved 2008 Capabilities Program Directive mandates a 5-year refresh cycle for this Information Technology system, (18-24 months per the CPD), with the DJC2 program serving as steward to ensure system capabilities remain aligned with Priority Critical Cybersecurity requirements and Deployable Distributed Command, Control & Communications (C3) capabilities. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 2 of 14 P-1 Line #62 Volume 2 - 538 === page 619 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604231N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Tactical/Mobile (TacMobile) C4I Systems - / 295.811 - / 3.272 - / 6.493 P-3a 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 (TBD) - / 27.887 - / 38.480 - / 31.715 - / 9.704 - / 0.000 - / 9.704 P-3a 2 / P-8A Ground Station (TBD) - / 21.672 - / 24.718 - / 26.693 - / 21.437 - / 0.000 - / 21.437 P-40 Total Gross/Weapon System Cost - / 345.370 - / 66.470 - / 64.901 - / 48.262 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 17.121 - / - - / 17.121 / 48.262 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Tactical/Mobile (TacMobile) C4I Systems P-3a 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 (TBD) P-5a - / - - / - - / - - / - - / - - / 4.403 - / 0.505 - / 0.000 - / 0.000 - P-3a 2 / P-8A Ground Station (TBD) - / 22.842 - / 23.212 - / 23.709 - / 24.182 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 51.090 - / 51.915 - / 52.990 - / 54.061 Continuing Continuing / 0.000 - / / 112.694 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 budget reflects an overall decrease of $16.639M which is primarily attributed to Tactical/Mobile (TacMobile) Command, Control, Communications, Computers, and Intelligence (C4I) Systems: P-40a: Tactical Mobile (TacMobile) C4I Systems - Increment 3: (+$10.67M) (0) Tactical Operations Center, which aligns to current fielding plan. (2) Mobile Tactical Operations Center Increment 3 procurement: ($13.83M). (0)TacMobile Increment III Higher Than Secret production support: (-$3.25M) TacMobile Increment III Production Support: (+$0.094M) (0) Fly Away Kits, which aligns to the current inventory objectives P-3a: Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3: (-$22.0M) (0) Tactical Operations Center, which aligns to current fielding plan (2) Mobile Tactical Operations Center Tech Refresh Installations, which is (2) less MTOC than was in the fielding plan: (-$20.905M) (0) Fly Away Kits, which aligns to the current inventory objectives Production Support decrease: (-$0.556M) Installation Design decrease: (-$0.549M) LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 3 of 14 P-1 Line #62 Volume 2 - 539 === page 620 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Program Elements for Code B Items: N/A Other Related Program Elements: 0604231N Line Item MDAP/MAIS Code: N/A Deployable Joint Command and Control (DJC2): FY2027 (-$0.067M) funding supports the procurement and fielding of (1) server stack for one (1) DJC2 core system and additional ancillary core infrastructure required to field new server stack. DJC2's modernization budget profile seeks to provide timely hardware and software upgrades required to facilitate timely posturing against evolving cybersecurity threats, while equally addressing equipment that is currently at or nearing End of Service/End of Life (EoS/EoL). DJC2 will maintain interoperability with Joint Force Commanders, address cyber vulnerabilities, and extend service life of fielded systems. P-40a: (1) Deployable Joint Command and Control (DJC2) core systems unit cost fluctuations due to the level of core system modernization efforts performed at each site from year to year. FY2027 supports the continued procurement and production of Interim P-8A Ground Station (PGS) to implement changes at one Tactical Operation Center (TOC) and procure 2 Fly-Away Kits (FAKs). These will be installed in FY2028 to support P-8A Increment 3 ECP6/7 configured aircraft. PGS Non-Recurring Engineering complete. P-40a: (2) P-8A Ground Station (PGS) Fly Away Kits (+$0.020M), FY2027 increase due to increased costs for COTS equipment for FAK units. (0) P-8A Ground Station Other Support (+$0.001M). FY2027 increase due to inflation. P3A: (1)P-8A ground station and associated support and installation (-$5.256). FY2027 decreases due to the completion of Non-Recurring Engineering. Funding continues the procurement of P-8A ground station (PGS) and associated support and installation costs. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 4 of 14 P-1 Line #62 Volume 2 - 540 === page 621 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Tactical/Mobile (TacMobile) C4I Systems Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) T4050 Tactical/Mobile 1.1) Consolidated Prior Year Requirements A (1) 1.2) Initial Fly Away Kit (FAK) A Subtotal: 1) T4050 Tactical/Mobile 1,355.224 192 1,000.000 2 260.203 - - - - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - 262.203 - - - - - - - - - - - - - - - - - - 13.830 - - - - - - - - - - - - - - - - - - - 0.000 - - - 2) Tac Mobile Increment III 2.2) MTOC A (2) 2.3) Higher Than Secret (HTS) A (†) Shelters Subtotal: 2) Tac Mobile Increment III 1,083.333 - 3 - 6,915.000 2 6,915.000 2 13.830 3.250 - - - - - - - - - 3.250 - - 13.830 - - - - - 13.830 3) P-8A Ground Station (PGS) 3.1) FAK A (3)(†) 3.2) NRE A Subtotal: 3) P-8A Ground Station (PGS) 435.000 0.930 - - - - - 2 0.870 1.750 445.000 - - 2 0.890 - 455.000 - - 2 0.910 - 465.000 - - 2 - - - - 465.000 - - 2 0.930 - - - 2.620 - - 0.890 - - 0.910 - - 0.930 - - - - - 0.930 48 18.430 1.862 - - - - - 18.430 - - 2.171 - - 1.929 - - 1.862 - - - - - 1.862 - - 6.777 - - - - - - - - - - - - - - - - - 2.717 - - - - - - - - - - - - - - - - - 9.494 - - - - - - - - - - - - - - - - - 2.659 - - - - - - - - - - - - - - - - - 2.659 - - - - - - - - - - - - - - - - - - - - - - - 0.183 - - 0.277 - - - - - 0.277 4) JH500 DJC2 Increment I System Enhancements 4.1) DJC2 Increment I System Enhancements A (4)(†) Subtotal: 4) JH500 DJC2 Increment I System Enhancements 383.958 2,171.000 1 2.171 1,929.000 1 1.929 1,862.000 1 1,862.000 1 1.862 5) T4776 Installation 5.1) Consolidated Prior Year Requirements A 5.2) Tac Mobile Tech Refresh 2.1.2 Installation A Subtotal: 5) T4776 Installation 6) Tac Mobile Support 6.1) Consolidated Prior Year Requirements A (5) Subtotal: 6) Tac Mobile Support 7) Support 7.1) Tac Mobile Increment III Production Support A (6) LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 5 of 14 P-1 Line #62 Volume 2 - 541 === page 622 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 7.2) P-8A Ground Station Other Support A MAIS Code Unit Cost ($ K) Qty (Each) - - Subtotal: 7) Support - Total - FY 2025 Total Cost ($ M) Unit Cost ($ K) Qty (Each) 0.405 - - - 0.405 - - 295.811 - FY 2026 Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ K) Qty (Each) 0.211 - - 0.221 - - - 0.211 - - 0.404 - - 3.272 - - 6.493 - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Aggregated Items Title: Tactical/Mobile (TacMobile) C4I Systems FY 2027 OOC Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 0.222 - - - - - 0.222 - 0.499 - - - - - 0.499 - 17.121 - - - - - 17.121 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) Consolidated Prior Year Requirements includes TacMobile Tech Refresh 2.1.2 (TOC and MTOC) costs FY2026 to FY2027 increase of $13.83M due to initial procurement of 2 Mobile Tactical Operations Center (MTOC) Increment 3 units. 3.1 FAK: The increase from FY2026 to FY2027 is due to increased costs for COTS equipment for FAK units. Quantities listed represent six (6) Deployable Joint Command and Control (DJC2) core systems garrisoned in Tampa, Florida (2); Brunswick, Georgia (1); Okinawa, Japan (1); Pearl Harbor, Hawaii (1); and Sigonella, Italy (1). Unit costs vary due to the number or level of core system modernization efforts performed at each site from year to year. Each DJC2 core is comprised of various components including but not limited to: Single Stack Server for each classification level, Environmental Control Units (ECU), Hawkeye 3 Heavy/Lite, GBS systems, AN/PRC-117G radios, Iridium phones, laptops, VoIP/VoSIP, VTC, Core Expansion Kits (CEK), Shelter/HVAC Power generation & distribution, Tables/Chairs & etc. Particular components are mission driven. Prior to FY2025, tech refresh focused on the replacement of inexpensive components for each of the 6 sites. As other more costly components approach End of Life (i.e. single stack servers), and real-world events require fully operational units at certain areas of responsibility, QTY/avg unit costs for FY2026 and beyond have been adjusted to indicate prioritized tech refresh focusing on higher dollar items that are in dire need of replacement. For example, one single stack server procurement/production support/site fielding is ~ $1.7M/ea server while procurement and fielding for an ECU ~ 1.4M/each core. (5) (6) Consolidated prior year requirements include Tac Mobile Tech Refresh 2.1.2 Shore Pre Installation Design Costs Increase (+$0.094M) from FY2026 to FY2027 to the production support of TacMobile Increment III Mobile Tactical Operations Center. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 6 of 14 P-1 Line #62 Volume 2 - 542 === page 623 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Aggregated Items: Tactical/Mobile (TacMobile) C4I Systems FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) 2026 NIWC LANT / Charleston, SC C / CPFF Charleston, SC Feb 2026 Aug 2026 3 1,083.333 Y Oct 2025 C / FFP Patuxent River, MD Jan 2025 Jan 2026 2 445.000 Y Dec 2022 Qty (Each) RFP Issue Date 2) Tac Mobile Increment III 2.3) Higher Than Secret (HTS) Shelters 3) P-8A Ground Station (PGS) 3.1) FAK (3) 2025 CACI / Austin, TX 3.1) FAK (3) 2026 CACI / Austin, TX C / FFP Patuxent River, MD Jan 2026 Jan 2027 2 455.000 Y Dec 2022 3.1) FAK (3) 2027 CACI / Austin, TX C / TBD Patuxent River, MD Jan 2027 Jan 2028 2 465.000 Y Dec 2022 2025 NAVWAR / San Diego WR San Diego, CA Apr 2025 Jun 2025 1 2,171.000 Y 2026 NAVWAR / San Diego WR San Diego, CA Apr 2026 Jun 2026 1 1,929.000 Y 2027 NAVWAR / San Diego WR San Diego, CA Apr 2027 Jun 2027 1 1,862.000 Y 4) JH500 DJC2 Increment I System Enhancements 4.1) DJC2 Increment I System Enhancements (4) 4.1) DJC2 Increment I System Enhancements (4) 4.1) DJC2 Increment I System Enhancements (4) LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 7 of 14 P-1 Line #62 Volume 2 - 543 === page 624 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 27.887 38.480 31.715 9.704 0.000 9.704 4.403 0.505 0.000 0.000 0.000 - - - - - - - - - - - 27.887 38.480 31.715 9.704 0.000 9.704 4.403 0.505 0.000 0.000 0.000 - - - - - - - - - - - 27.887 38.480 31.715 9.704 0.000 9.704 4.403 0.505 0.000 0.000 0.000 Total 112.694 112.694 112.694 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Technical Refresh of Command and Control, Networking SECRET enclave to commence TacMobile Mobile systems (MTOC) alignment with P-8A Inc 3 Ground Station (PGS) at Non PGS site architecture within a package that incorporates Size, Weight and Power (SWAP) reductions for mobility to be readily transported by Navy Transport Aircraft, in order to maintain worldwide operational support for Maritime Patrol Family of Systems aircraft operations. FY2027 Decrease (-$22.011M) attributed to completion of procurements of Tactical Operation Center (TOC) hardware and quantity decrease from (4) to (2) Mobile Tactical Operations Center (MTOC), in accordance with the fielding plan. [MTOC] Decrease in cost (-$20.9M) and quantity (-2) from FY2026 to FY2027 for TacMobile Tech Refresh 2.1.3 Mobile Tactical Operations Center procurement. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 8 of 14 P-1 Line #62 Volume 2 - 544 === page 625 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 A Kits Recurring 1.1.1) TOC - NonOrganic - / - 1 / 6.347 4 / 25.400 3 / 19.450 (7) 1.1.2) MTOC - NonOrganic (8) 1.1.3) Fly Away Kit - Organic - (9) Subtotal: Recurring / 25.400 - Subtotal: Tactical Mobile (TacMobile) C4I Systems Tech Refresh 2.1.3 Subtotal: Procurement, All Modification Items / - 4 / 25.400 / 25.400 - - / 32.617 - / 32.617 / - / 27.309 - 14 / 32.617 - - 4 / 27.309 10 / 6.820 - / - - 4 / 27.309 - / - - / - - 2 / 6.404 - / - - / - - / - / 6.404 - / - 2 / 6.404 - / - - / - - / - - / - - / - - / - - / - 1 / 6.347 2 / 6.404 1 / 3.494 - / - - / - - / - - / - 14 / 82.057 - - / - - / - - / - - / - - / - / 3.494 - / - - / - - / - 1 / 3.494 - / - - / - - / - - / - - / - - / - / 0.020 - / - - / - / / 6.404 - 2 / 6.404 / 27.309 - / 6.404 - / - - / 6.404 - / 3.494 / 0.000 - / / 0.000 - 10 / 6.820 / 95.224 - 25 / 95.224 / 95.224 - Support (All Modification Items) - / 1.000 - / 1.000 - / 0.606 - / 0.057 - / - - / 0.057 - / 0.040 - / 1.487 - / 1.563 - / 0.683 - / 0.127 - / - - / 0.127 - / 0.069 / - - / - - / - - / 2.487 - / 2.563 - / 1.289 - / 0.184 - / - - / 0.184 - / 0.109 - / 0.020 - / - - / - - Modification Item 1 of 1: Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 - / 0.000 - / 3.300 - / 3.117 - / 3.116 / 0.000 - / 3.116 - / 0.800 - / 0.485 / 0.000 - / 0.000 - / 10.818 Subtotal: Installation - / 0.000 - / 3.300 - / 3.117 - / 3.116 / - - / 3.116 - / 0.800 - / 0.485 / - - / 0.000 - / 10.818 2.1) Pre Shore Installation Design (10) 2.2) Production Support Subtotal: Support - - / - - / 2.723 / - - / 3.929 / 0.000 - / 6.652 Installation - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 2906 - Tactical/Mobile C4I Systems Navy 27.887 38.480 31.715 9.704 0.000 UNCLASSIFIED Page 9 of 14 9.704 4.403 0.505 P-1 Line #62 0.000 0.000 0.000 112.694 Volume 2 - 545 === page 626 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 MDAP/MAIS Code: Modification Item 1 of 1: Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 Manufacturer Information Manufacturer Name: NIWC LANT Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 FY 2031 Delivery Dates Aug 2025 Aug 2026 Aug 2027 Aug 2028 Aug 2029 Aug 2030 Installation Information Method of Implementation: Method:: Installation Name: TacMobile Tech Refresh 2.1.3 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - 4 / 3.300 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 3.300 FY 2025 - / - - / - 4 / 3.117 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 3.117 FY 2026 - / - - / - - / - 4 / 3.116 0 / 0.000 4 / 3.116 - / - - / - - / - - / - 0 / 0.000 4 / 3.116 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 0.800 - / - - / - - / - 0 / 0.000 2 / 0.800 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.485 - / - - / - 0 / 0.000 1 / 0.485 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 4 / 3.300 1 / 0.485 - / - - / - 0 / 0.000 4 / 3.117 4 / 3.116 0 / 0.000 4 / 3.116 2 / 0.800 15 / 10.818 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 2 2 - - 3 1 - - 1 3 - - 2 - - - 1 - - - - - - - - - - 15 Out - - - 2 2 - - 3 1 - - 1 3 - - 2 - - - 1 - - - - - - - - - - 15 Method of Implementation (Organic): Fly Away Kit Installation Quantity: 10 Footnotes: LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 10 of 14 P-1 Line #62 Volume 2 - 546 === page 627 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Tactical Mobile (TacMobile) C4I Systems - Tech Refresh 2.1.3 MDAP/MAIS Code: (7) NIWC LANT conducts 6-month Integration, Assembly and Test of HW/SW components prior to final installation in subsequent fiscal year. Quantities listed represent six (6) Technical Operational Centers (TOCs): Systems located at Naval Air Station (NAS) Jacksonville, Florida; NAS Sigonella, Italy; Marine Corps Base Hawaii (MCBH) Kaneohe Bay, Hawaii; NAS Whidbey Island, Washington; Naval Air Facility (NAF) Kadena, Japan; and Isa Air Base Bahrain. Unit costs vary due to the number or level of core system modernization efforts performed at each site from year to year. TacMobile enhancements are broken into three incremental Capability Packages, CP1-3. CP-1 or Tech Refresh 2.1.3 will incorporate advances in the underlying technology to both the command and control system and the media storage device. The media storage device will go through several variations to lower the Size, Weight and Power requirements. The command-and-control system will be cyber hardened and will provide increases in storage and performance. TacMobile Increment 3, or CP-2 and CP-3, will add a Higher Than Secret Enclave. CP-2 provides the minimal viable product to be compatible with the Increment 3 Block 2 P-8 Aircraft. CP-3 will be in full compliance with the Capability Production Document and will provide media interoperability with our CO-OP and FMS partners. (8) NIWC LANT conducts 6-month Integration, Assembly and Test of HW/SW components prior to final installation in subsequent fiscal year. Unit costs vary due to the number or level of core system modernization efforts performed at each site from year to year. TacMobile enhancements are broken into three incremental Capability Packages, CP1-3. CP-1 or Tech Refresh 2.1.3 will incorporate advances in the underlying technology to both the command and control system and the media storage device. The media storage device will go through several variations to lower the Size, Weight and Power requirements. The command-and-control system will be cyber hardened and will provide increases in storage and performance. TacMobile Increment 3, or CP-2 and CP-3, will add a Higher Than Secret Enclave. CP-2 provides the minimal viable product to be compatible with the Increment 3 Block 2 P-8 Aircraft. CP-3 will be in full compliance with the Capability Production Document and will provide media interoperability with our CO-OP and FMS partners. (9) End-to-End Fly Away Kit procurement. Achieves threshold requirement for P-8A Operations. Provides Expeditionary Command and Control, Networking SECRET enclave within a package that incorporates Size, Weight and Power (SWAP) reductions for mobility to be readily transported by Navy P-8A Aircraft, in order to maintain worldwide operational support for Maritime Patrol Family of Systems aircraft operations. Increases P-8A ability to operate from expeditionary airfields and provide better P-8A support to Major Combat Operations (MCO) Operational Plans (OPLANS). (10) Pre-Shore Installation Design funding supports installation planning and other pre-installation activities required by shore site. Each MTOC and TOC procured unit requires funding by installation event and is budgeted the year prior to MTOC/TOC installation. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 11 of 14 P-1 Line #62 Volume 2 - 547 === page 628 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / P-8A Ground Station MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 21.672 24.718 26.693 21.437 0.000 21.437 22.842 23.212 23.709 - - - - - - - - - 21.672 24.718 26.693 21.437 0.000 21.437 22.842 23.212 23.709 - - - - - - - - - 21.672 24.718 26.693 21.437 0.000 21.437 22.842 23.212 23.709 To FY 2031 Complete 24.182 Continuing - Continuing - 24.182 Continuing - Total - Continuing - - 24.182 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Implements P-8A Inc 3 Ground Station (PGS) necessary changes to the Tactical Operations Centers (TOCs) and one Mobile Tactical Operations Center (MTOC) in order to support the P-8 Increment 3 ECP 6 & 7 configured aircraft to conduct preflight mission planning, operate within SECRET and TS/SCI enclaves, perform in-flight Command and Control (C2) mission support, and conduct post flight debriefing and sensor data dissemination. FY2027 decrease due to the completion of Non-Recurring Engineering. Funding continues the procurement of P-8A ground station (PGS) and associated support and installation costs. LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 12 of 14 P-1 Line #62 Volume 2 - 548 === page 629 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / P-8A Ground Station MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: P-8A Ground Station B Kits Recurring 1.1.1) TOC/MTOC - NonOrganic 1 / 17.530 (11) Subtotal: Recurring / 17.530 - 1 / 16.445 / 16.445 - 1 / 16.774 / 16.774 - 1 / 17.110 - / - / 17.110 - / - - 1 / 17.110 / 17.110 - 1 / 17.452 / 17.452 - 1 / 17.801 / 17.801 - 1 / 18.157 / 18.157 - 1 / 18.520 Continuing Continuing / 18.520 Continuing Continuing - Non-Recurring 1.2.1) NRE - Organic - / 3.341 - / 3.207 - / 5.491 - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Subtotal: Non-Recurring - / 3.341 - / 3.207 - / 5.491 - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 1 / 17.110 - / - 1 / 17.110 1 / 18.520 Continuing Continuing / 17.110 - / - / 18.520 Continuing Continuing / 0.442 - / - / - - / - - / - Subtotal: P-8A Ground Station Subtotal: Procurement, All Modification Items 1 / 20.871 / 20.871 - 1 / 19.652 / 19.652 - 1 / 22.265 / 22.265 - - / 17.110 - 1 / 17.452 / 17.452 - 1 / 17.801 / 17.801 - 1 / 18.157 / 18.157 - - Support (All Modification Items) 2.1) Other Support - 2.2) Training Support Subtotal: Support / 0.801 - - / - / 0.419 - - / - / 0.422 - - / - - - / 0.801 - / 0.419 - / 0.422 - / 0.442 Modification Item 1 of 1: P-8A Ground Station - / 0.000 - / 4.647 - / 4.006 - / 3.885 Subtotal: Installation - / 0.000 - / 4.647 - / 4.006 - / 3.885 - / 0.442 - / 0.451 - / 0.460 - / 0.470 - / 0.478 Continuing Continuing / - - / 0.849 - / 0.866 - / 0.884 - / 0.902 Continuing Continuing - / 0.442 - / 1.300 - / 1.326 - / 1.354 - / 1.380 Continuing Continuing / 0.000 - / 3.885 - / 4.090 - / 4.085 - / 4.198 - / 4.282 Continuing Continuing / - - / 3.885 - / 4.090 - / 4.085 - / 4.198 - / 4.282 Continuing Continuing 24.182 Continuing Continuing - Installation - Total Total Cost (Procurement + Support + Installation) LI 2906 - Tactical/Mobile C4I Systems Navy 21.672 24.718 26.693 21.437 0.000 UNCLASSIFIED Page 13 of 14 21.437 22.842 23.212 P-1 Line #62 23.709 Volume 2 - 549 === page 630 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2906 / Tactical/Mobile C4I Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / P-8A Ground Station MDAP/MAIS Code: Modification Item 1 of 1: P-8A Ground Station Manufacturer Information Manufacturer Name: CACI Manufacturer Location: Austin, TX Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: TOC/MTOC Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - 1 / 4.647 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 4.647 FY 2025 - / - - / - 1 / 4.006 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 4.006 FY 2026 - / - - / - - / - 1 / 3.885 0 / 0.000 1 / 3.885 - / - - / - - / - - / - 0 / 0.000 1 / 3.885 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 4.090 - / - - / - - / - 0 / 0.000 1 / 4.090 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 4.085 - / - - / - 0 / 0.000 1 / 4.085 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.198 - / - 0 / 0.000 1 / 4.198 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.282 0 / 0.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 1 / 4.647 1 / 4.006 1 / 3.885 0 / 0.000 1 / 3.885 1 / 4.090 1 / 4.085 1 / 4.198 Continuing - 1 / 4.282 1 / 4.282 Continuing / - Continuing - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 1 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 8 Out - - - - - - - - - - - - - - - - 1 8 - 1 1 - 1 - 1 - 1 - 1 - 1 Footnotes: (11) Differences in unit cost between Tacmobile and P-8 Ground System (PGS) are due to the new infrastructure added by PGS which includes: HTS enclaves, Minotaur servers, Crowbar Mission Drive Management, Aircraft Media Gateway (AMG) media builder, and Data At Rest Encryption (DARE). LI 2906 - Tactical/Mobile C4I Systems Navy UNCLASSIFIED Page 14 of 14 P-1 Line #62 Volume 2 - 550 === page 631 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Program Elements for Code B Items: N/A Other Related Program Elements: 0304785N Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 16.946 12.112 11.824 0.000 11.824 13.114 13.376 13.376 353.437 353.437 - - - - - - - - 16.946 12.112 11.824 0.000 11.824 13.114 13.376 13.376 353.437 To FY 2031 Complete - Total - 13.639 Continuing - Continuing - 13.639 Continuing - Continuing - - - - - - - - - - 16.946 12.112 11.824 0.000 11.824 13.114 13.376 13.376 13.639 Continuing Continuing 0.466 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.206 0.635 1.738 - 1.738 0.836 0.258 0.502 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Distributed Common Ground Systems- Navy (DCGS-N) is a cooperative effort between the services, agencies, and the Department of War (DoW) to provide systems capable of receiving, processing, exploiting, and disseminating data from airborne and national reconnaissance platforms. DCGS-N is the Navy instance of the Under Secretary of War, Intelligence (USW (I)) DCGS Family of Systems (FoS). The DoW has defined a DCGS architecture that will be compatible and interoperable across all of the Services Intelligence, Surveillance, and Reconnaissance (ISR) systems and operations. DCGS accesses and ingests data from space borne, airborne, subsurface, and surface ISR collection assets, intelligence databases, and intelligence producers. Integration with the Common Data Fabric (CDF) will enhance access and sharing of ISR information across Joint forces using common enterprise standards and services. DCGS FoS supports Joint Task Force (JTF)-level and below combat operations with critical intelligence for battle management and information dominance to maintain a tactical advantage over adversaries. DCGS-N Afloat and Ashore systems fulfill a critical mission set Afloat and Ashore. DCGS-N processes and exploits tactical and Imagery Intelligence (IMINT), Geospatial Intelligence (GEOINT), and Signals Intelligence (SIGINT); facilitates precision target geopositioning, mensuration, and imagery capabilities; integrates national IMINT requirements and processing capabilities from the National GeospatialIntelligence Agency (NGA), and shares Intelligence, Surveillance, Reconnaissance, and Targeting (ISR&T) and Command and Control information via the DIB, Defense Intelligence Information Enterprise (DI2E), and Net-Centric Enterprise Services (NCES) standards with a wide range of customers. The DCGS-N program conducts research and assessments of tactically relevant, emerging technologies for program insertion to ensure superiority in the intelligence domain. The DCGS-N Enterprise Node (DEN) facilitates interoperability and data sharing among the DCGS FoS. DCGS-N provides software integration prior to installation and complies with the DoW DCGS network architecture. [P5 - 2 / Intelligence Carry-On Program (ICOP)]: 5E004: Intelligence Carry-On Program (ICOP) is a suite of multi-source intelligence and analytical capabilities that includes an integrated Three-Dimensional (3-D) operational picture displaying intelligence and other data sources to provide a richer and more complete picture of the battle space on Unit Level platforms. The system supports a Full Motion Video (FMV) capability that receives, processes, exploits, and disseminates organic and non-organic data as well as the ability to process and correlate Electronic Intelligence (ELINT) and external Communications Intelligence (COMINT Externals). It integrates a menu of mature Commercial Off-the-Shelf (COTS) and Government Off-the-Shelf (GOTS) applications with shared storage and communication paths to reach back to the DEN, and to provide data sharing to the Maritime Operations Centers (MOC) and National ISR systems, making tactical users a part of the larger ISR enterprise. ICOP provides Indications and Warnings (I&W), battlespace awareness/visualization, pattern of life analysis, FMV and ISR Processing, Exploitation and Dissemination (PED) capabilities in support of Unit-Level Navy surface (CG, DDG, LPD, FFG, and DDG 1000 classes) and expeditionary operations. The ICOP system includes a three-eyed ruggedized workstation that serves as a powerful afloat edge computing device that is capable of operating on all three security domains (NIPR, SIPR and JWICs) and an antenna/receiver set (called Communications Module 3 - CM3) that is used to ingest, process and exploit airborne sensor data. In addition to supporting multi-intelligence capabilities, Intelligence Carry-On Program (ICOP)/Communications Module 3 (CM3) provides an end-to-end Intelligence, Surveillance, and Reconnaissance (ISR) PED architecture LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 1 of 14 P-1 Line #63 Volume 2 - 551 === page 632 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Program Elements for Code B Items: N/A Other Related Program Elements: 0304785N Line Item MDAP/MAIS Code: 000 that includes processing organic shipboard camera systems to support Navy-wide Operational Task (OPTASK) Visual Information (Strategic Communications - "First to the Truth," pattern of life analysis and use of force/rules of engagement decisions). For procurement activities, Intelligence Carry-On Program (ICOP) satisfies Unit-Level requirements as part of the Distributed Common Ground System - Navy (DCGS-N) Family of Systems (FoS). ICOP has been designated as a Navy equipage system (carry on/carry off). ICOP employs a cross-decking methodology by drawing from a rotatable pool of workstations to support the total inventory objective. The ICOP workstation and CM3 antenna/receivers are considered carry on/carry off equipment while the supporting infrastructure to mount the systems is considered permanent infrastructure. [P5 - 3 / DCGS-N Increment 2 Ashore]: 5E004: Distributed Common Ground System - Navy (DCGS-N) Increment 2 Ashore will field emergent, transformational Commercial Off-the-Shelf (COTS) and Government Off-the-Shelf (GOTS) technologies in order to streamline Sailor's analytical efforts and improve targeting solutions for the operator, optimizing and compressing the kill chain. DCGS-N Increment 2 will deliver all source fusion and analytical capabilities; provide Maritime Domain Awareness (MDA) capabilities and integrate Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capabilities to optimize the use and analysis of sensor and platform data. DCGS-N Increment 2 leverages enterprise solutions to share information across commands, services, and agencies to promote shared situational awareness. DCGS-N Increment 2 consists of multiple releases that build upon capability over time and allow for ongoing fleet feedback as the software matures. DCGS-N Increment 2 will insert new technology enhancements via incremental software upgrades. Continued development of follow-on releases will be based on prioritized Fleet requirements. DCGS-N Increment 2 addresses a critical shortfall in TCPED capability and capacity to support operational, tactical planning, and execution across the full range of joint military operations. Existing TCPED shortfalls will be exacerbated by planned Navy, Joint, and Allied fielding of new Intelligence, Surveillance, and Reconnaissance (ISR) platforms. Currently fielded systems provide localized processing capabilities that will be overwhelmed in future years without a significant change in the way the Navy processes, exploits and disseminates intelligence data. LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 2 of 14 P-1 Line #63 Volume 2 - 552 === page 633 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Program Elements for Code B Items: N/A Other Related Program Elements: 0304785N Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / CONSOLIDATED PRIOR YEAR REQUIREMENTS - / 281.250 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-5 2 / Intelligence Carry-On Program (ICOP) P-5a - / 34.754 - / 3.436 - / 3.022 - / 2.638 - / 0.000 - / 2.638 P-5 3 / DCGS-N Increment 2 Ashore P-5a - / 16.357 - / 3.759 - / 2.262 - / 0.000 - / 0.000 - / 0.000 P-3a 1 / DCGS-N Increment 2 (Afloat) (TBD) - / 21.076 - / 9.751 - / 6.828 - / 9.186 - / 0.000 - / 9.186 P-40 Total Gross/Weapon System Cost - / 353.437 - / 16.946 - / 12.112 - / 11.824 - / 0.000 - / 11.824 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / CONSOLIDATED PRIOR YEAR REQUIREMENTS - / - - / - - / - - / - - / - - / - P-5 2 / Intelligence Carry-On Program (ICOP) P-5a - / - - / - - / - - / - - / - - / - P-5 3 / DCGS-N Increment 2 Ashore P-5a - / - - / - - / - - / - - / - - / - P-3a 1 / DCGS-N Increment 2 (Afloat) (TBD) - / 10.372 - / 10.495 - / 10.664 - / 10.915 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 13.114 - / 13.376 - / 13.376 - / 13.639 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding request procures the following: P-5: Intelligence Carry-On Program (ICOP) - (3) ICOP Workstation Procurement - (16) ICOP Workstation Tech Refreshes - (4) Communications Module 3 (CM3) Set Tech Refreshes P-3a: DCGS-N Increment 2 Afloat - (3) DCGS-N Inc 2 Afloat DCGS-N Tactical Edge Equipment (DTEE) Procurements LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 3 of 14 P-1 Line #63 Volume 2 - 553 === page 634 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / CONSOLIDATED PRIOR YEAR REQUIREMENTS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 281.250 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 281.250 Plus CY Advance Procurement ($ in Millions) - - - - - 0.000 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 281.250 FY 2027 Total - - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - Consolidated Prior Year Requirements Cost Recurring Cost 1.1.1) Consolidated Prior Year Requirements - - 281.250 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 281.250 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware Consolidated Prior Year Requirements Cost - - 281.250 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 281.250 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Remarks: [Hardware] Consolidated Prior Year Requirements includes: Distributed Common Ground System - Navy (DCGS-N) to include Joint Services Imagery Processing System - Navy (JSIPS-N) and Distributed Common Ground System - Navy (DCGS-N) Increment 1 Ashore and Afloat initial Full Rate Production (FRP) Systems, and DCGS-N Increment 1 Product Improvement, Intelligence Carry-On Program (ICOP) Foundation Kit Procurement, ICOP CM3 Set Procurements, DCGS-N Hardware/Workstation Upgrades, DCGS-N Tech Refresh Upgrade, and associated production support and installation cost. LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 4 of 14 P-1 Line #63 Volume 2 - 554 === page 635 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Intelligence Carry-On Program (ICOP) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 34.754 3.436 3.022 2.638 0.000 2.638 - - - - - - 34.754 3.436 3.022 2.638 0.000 2.638 - - - - - - 34.754 3.436 3.022 2.638 0.000 2.638 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - ICOP Cost Recurring Cost 1.1.1) ICOP Workstation Procurement (†) 1.1.2) ICOP Workstation Tech (†) (1) Refreshes 1.1.3) CM3 Set Tech (†) (2) Refreshes 177.366 134 23.767 76.468 3 0.229 77.998 3 0.234 79.558 3 0.239 - - 0.000 79.558 3 0.239 54.111 99 5.357 51.550 22 1.134 51.238 21 1.076 52.263 16 0.836 - - 0.000 52.263 16 0.836 167.143 21 3.510 173.000 11 1.903 175.143 9 1.576 178.646 4 0.715 - - 0.000 178.646 4 0.715 Subtotal: Recurring Cost - - 32.634 - - 3.266 - - 2.886 - - 1.790 - - 0.000 - - 1.790 Subtotal: Hardware - ICOP Cost - - 32.634 - - 3.266 - - 2.886 - - 1.790 - - 0.000 - - 1.790 - - 0.000 - - 0.000 - - 0.000 - - 0.501 - - 0.000 - - 0.501 - - 0.000 - - 0.000 - - 0.000 - - 0.240 - - 0.000 - - 0.240 - - 0.000 - - 0.000 - - 0.000 - - 0.741 - - 0.000 - - 0.741 Support - 5E777 Installations Cost 2.1) ICOP - Install 2.2) ICOP DSA (3) (4) Subtotal: Support - 5E777 Installations Cost Support - 5E555 Production Support Cost 3.1) ICOP Production Support - - 2.120 - - 0.170 - - 0.136 - - 0.107 - - 0.000 - - 0.107 Subtotal: Support - 5E555 Production Support Cost - - 2.120 - - 0.170 - - 0.136 - - 0.107 - - 0.000 - - 0.107 LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 5 of 14 P-1 Line #63 Volume 2 - 555 === page 636 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Intelligence Carry-On Program (ICOP) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($ K) - FY 2025 Total Cost Qty (Each) ($ M) - 34.754 Unit Cost ($ K) - FY 2026 Total Cost Qty (Each) ($ M) - 3.436 Unit Cost ($ K) - FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($ K) 3.022 - FY 2027 OOC Total Cost Qty (Each) ($ M) - 2.638 Unit Cost ($ K) - FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($ K) - Total Cost Qty (Each) ($ M) - 2.638 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (1.1.2) ICOP Workstation Tech Refreshes: Decrease from FY 2026 to FY 2027 is attributed to the procurement of (5) less ICOP Workstation Tech Refreshes. (1.1.3) CM3 Set Tech Refreshes: Decrease from FY 2026 to FY 2027 is attributed to the procurement of (5) less CM3s. 2.1 (5E777) ICOP - Install: ICOPs Total Inventory Objective increase requires additional infrastructure installations on ships, which is a mandatory requirement prior to receiving roll-on/roll-off approvals. 2.2 (5E777) ICOP - DSA: Design Service Allocations are required for ICOPs infrastructure installations. LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 6 of 14 P-1 Line #63 Volume 2 - 556 === page 637 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 FY Contractor and Location 1.1.1) ICOP Workstation Procurement 2025 DLA Troop Support / Philadelphia, PA C / FFP San Diego Dec 2024 Mar 2025 3 76.468 Y 1.1.1) ICOP Workstation Procurement 2026 NSMA - ICOP Workstation / San Diego, CA C / FFP San Diego Mar 2026 Jun 2026 3 77.998 Y 1.1.1) ICOP Workstation Procurement 2027 NSMA - ICOP Workstation / San Diego, CA C / FFP San Diego Mar 2027 Jun 2027 3 79.558 Y 1.1.2) ICOP Workstation Tech Refreshes 2025 DLA Troop Support / Philadelphia, PA C / FFP San Diego Dec 2024 Mar 2025 22 51.550 Y 1.1.2) ICOP Workstation Tech Refreshes 2026 NSMA - ICOP Workstation Tech Refreshes / San Diego, CA C / FFP San Diego Mar 2026 Jun 2026 21 51.238 Y 1.1.2) ICOP Workstation Tech Refreshes 2027 NSMA - ICOP Workstation Tech Refreshes / San Diego, CA C / FFP San Diego Mar 2027 Jun 2027 16 52.263 Y 1.1.3) CM3 Set Tech Refreshes 2025 DLA Troop Support / Philadelphia, PA C / FFP San Diego Dec 2024 Mar 2025 11 173.000 Y 2026 NSMA - CM3 Set Tech Refreshes / San Diego, CA C / FFP San Diego Mar 2026 Jun 2026 9 175.143 Y 2027 NSMA - CM3 Set Tech Refreshes / San Diego, CA C / FFP San Diego Mar 2027 Jun 2027 4 178.646 Y 1.1.3) CM3 Set Tech Refreshes 1.1.3) CM3 Set Tech Refreshes LI 2914 - Intelligence Surveillance and Reconnaiss... Navy Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 2 / Intelligence Carry-On Program (ICOP) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) UNCLASSIFIED Page 7 of 14 P-1 Line #63 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 2 - 557 === page 638 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 3 / DCGS-N Increment 2 Ashore MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 16.357 3.759 2.262 0.000 0.000 0.000 - - - - - - 16.357 3.759 2.262 0.000 0.000 0.000 - - - - - - 16.357 3.759 2.262 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - DCGS-N Increment 2 Ashore Cost Recurring Cost 1.1.1) DCGS-N Inc 2 Procurements 12 12.206 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 12.206 - - 3.008 - Subtotal: Hardware - DCGSN Increment 2 Ashore Cost - - 12.206 - - 3.008 - 2.1.1) DCGSN Increment 2 Installations (Ashore) - - 3.399 - - 0.578 Subtotal: Recurring Cost - - 3.399 - - - - 3.399 - (Ashore) (†) 1.1.2) DCGS-N Inc 2 Workstation Node (DWN) (Ashore) (†) 1,017.167 1,002.686 3 3.008 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.424 - - 0.000 - - 0.000 - - 0.000 - 1.424 - - 0.000 - - 0.000 - - 0.000 - 1.424 - - 0.000 - - 0.000 - - 0.000 - - 0.751 - - 0.000 - - 0.000 - - 0.000 0.578 - - 0.751 - - 0.000 - - 0.000 - - 0.000 - 0.578 - - 0.751 - - 0.000 - - 0.000 - - 0.000 356.000 4 Hardware - Installation Cost Recurring Cost Subtotal: Hardware Installation Cost Support - Support Costs Cost 3.1) Production Support - - 0.752 - - 0.173 - - 0.087 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - Support Costs Cost - - 0.752 - - 0.173 - - 0.087 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 16.357 - - 3.759 - - 2.262 - - 0.000 - - 0.000 - - 0.000 LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 8 of 14 P-1 Line #63 Volume 2 - 558 === page 639 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: 3 / DCGS-N Increment 2 Ashore MDAP/MAIS Code: indicates the presence of a P-5a LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 9 of 14 P-1 Line #63 Volume 2 - 559 === page 640 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 FY Contractor and Location 1.1.1) DCGS-N Inc 2 Procurements (Ashore) 2025 SAIC / San Diego, CA C / CPFF San Diego Dec 2024 May 2025 3 1,002.686 Y 1.1.2) DCGS-N Inc 2 Workstation Node (DWN) (Ashore) 2026 SAIC / San Diego, CA C / CPFF San Diego Dec 2025 May 2026 4 356.000 Y LI 2914 - Intelligence Surveillance and Reconnaiss... Navy Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: 3 / DCGS-N Increment 2 Ashore Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) UNCLASSIFIED Page 10 of 14 P-1 Line #63 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 2 - 560 === page 641 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / DCGS-N Increment 2 (Afloat) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 21.076 9.751 6.828 9.186 0.000 9.186 10.372 10.495 10.664 - - - - - - - - - 21.076 9.751 6.828 9.186 0.000 9.186 10.372 10.495 10.664 - - - - - - - - - 21.076 9.751 6.828 9.186 0.000 9.186 10.372 10.495 10.664 To FY 2031 Complete 10.915 Continuing - Continuing - 10.915 Continuing - Total - Continuing - - 10.915 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: 5E004: Distributed Common Ground System, Navy (DCGS-N) Increment 2 (Afloat) expedites the Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) process to support operational, tactical planning, and execution across the full range of joint military operations. DCGS-N Increment 2 improves the ability to detect identify, and predict maritime threats via accelerated access to the Intelligence Community (IC) and ISR data for Maritime Forces. The DCGS-N Increment 2 robust, cross-domain data fusion and automated analytics and workflows bridge the gap between Naval operational sensors and platforms and Naval, Joint, and IC Enterprises. DCGS-N Increment 2 leverages an Agile software development methodology, delivering Iterative Releases to ensure flexibility in meeting emergent requirements and addressing Fleet user priorities. DCGS-N Increment 2 leverages a common set of Intelligence tools, providing the Fleet a dependable, resilient and reliable weapons system afloat ISR and IW warfighters use to conduct all Operational Intelligence (OPINTEL), Common Intelligence Picture/Common Operational Picture (CIP/COP), Targeting, and intelligence fusion processes. [DCGS-N Tactical Edge Equipment (DTEE) Inc 2 Procurement] DCGS-N Tactical Edge Equipment (DTEE) Inc 2 Procurement encompasses DCGS-N Ashore Systems and supports cyber reciprocity between Ashore and Afloat Baselines. DTEE will address key system obsolescence, modernize the system architecture, and enhance the programs ability to deliver capability quickly. DTEE provides a multi-enclave, on premise cloud hosting and remote services to enable worldwide use of DCGS-N Inc 2 through dedicated workstation nodes and high-side web-enabled interface. DTEE updates the End-Of-Life (EOL) DCGS-N GENSER sensor rack hardware and may install a new DCGS-N Sensitive Compartmented Information (SCI) sensor rack. LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 11 of 14 P-1 Line #63 Volume 2 - 561 === page 642 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / DCGS-N Increment 2 (Afloat) FY 2025 FY 2026 Related RDT&E PEs: 0304785N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DCGS-N Increment 2 (Afloat) A Kits Recurring 1.1.1) DCGS-N Inc 2 Procurement - NonOrganic 27 / 14.888 1.1.2) DCGS-N Tactical Edge Equipment (DTEE) Inc 2 Procurement - NonOrganic Subtotal: Recurring Subtotal: DCGS-N Increment 2 (Afloat) Subtotal: Procurement, All Modification Items - / 14.888 - - / - 27 / 14.888 - / - - 1 / 1.830 / 1.830 / - - 3 / 5.600 - 1 / 1.830 / 5.600 - 3 / 5.600 / - - / - - 3 / 5.712 - / - 3 / 5.712 / - / - - - - / - - / - - / - - / 5.712 - / 7.768 - / 5.943 - / 8.082 / 14.888 - / 1.830 - / 5.600 - / 5.712 - - 4 / 7.768 / 5.943 / - - 4 / 8.082 / 5.712 3 / 5.712 / 7.768 / - 3 / 5.943 3 / 5.712 - / 5.712 - 4 / 7.768 - 3 / 5.943 / 8.082 / - - / - 27 / 14.888 3 / 6.183 Continuing Continuing / 6.183 Continuing Continuing 3 / 6.183 Continuing Continuing - / 6.183 Continuing Continuing - 4 / 8.082 Support (All Modification Items) 2.1) Production Support - / 1.008 - / 0.060 - / 0.180 - / 0.180 - / 0.000 - / 0.180 - / 0.240 - / 0.180 - / 0.240 - / 0.180 Continuing Continuing (5) - / 5.180 - / 0.135 - / 0.260 - / 0.546 - / 0.000 - / 0.546 - / 0.743 - / 0.568 - / 0.773 - / 0.591 Continuing Continuing - / 6.188 - / 0.195 - / 0.440 - / 0.726 / - - / 0.726 - / 0.983 - / 0.748 - / 1.013 - / 0.771 Continuing Continuing Modification Item 1 of 1: DCGS-N Increment 2 (Afloat) - / 0.000 - / 7.726 - / 0.788 - / 2.748 / 0.000 - / 2.748 - / 1.621 - / 3.804 - / 1.569 - / 3.961 Continuing Continuing Subtotal: Installation - / 0.000 - / 7.726 - / 0.788 - / 2.748 / - - / 2.748 - / 1.621 - / 3.804 - / 1.569 - / 3.961 Continuing Continuing 10.915 Continuing Continuing 3.1) DSA Subtotal: Support - Installation - Total Total Cost (Procurement + Support + Installation) 21.076 LI 2914 - Intelligence Surveillance and Reconnaiss... Navy 9.751 6.828 9.186 0.000 UNCLASSIFIED Page 12 of 14 9.186 10.372 10.495 P-1 Line #63 10.664 Volume 2 - 562 === page 643 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DCGS-N Increment 2 (Afloat) MDAP/MAIS Code: Modification Item 1 of 1: DCGS-N Increment 2 (Afloat) Manufacturer Information Manufacturer Name: NSMA - DTEE Hardware Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: DCGS-N Inc 2 Procurement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 20 / 0.000 27 / 7.726 Prior Years 7 / 7.726 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 7.726 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 20 / 0.000 27 / 7.726 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 20 1 2 2 2 - - - - - - - - - - - - - - - - - - - - - - - - - 27 Out 20 1 2 2 - - - - - - - - - - - - - - - - - - - - - - - - 27 - 2 Method of Implementation: [none specified]:: Installation Name: DCGS-N Tactical Edge Equipment (DTEE) Inc 2 Procurement Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - / - LI 2914 - Intelligence Surveillance and Reconnaiss... Navy / - / - / - / - UNCLASSIFIED Page 13 of 14 / - / - / - P-1 Line #63 / - / - / - / - Volume 2 - 563 === page 644 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2914 / Intelligence Surveillance and Reconnaissance (ISR) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DCGS-N Increment 2 (Afloat) MDAP/MAIS Code: Modification Item 1 of 1: DCGS-N Increment 2 (Afloat) Installation Information Method of Implementation: [none specified]:: Installation Name: DCGS-N Tactical Edge Equipment (DTEE) Inc 2 Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - 1 / 0.788 - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.788 FY 2026 - / - - / - - / - 3 / 2.748 0 / 0.000 3 / 2.748 - / - - / - - / - - / - 0 / 0.000 3 / 2.748 FY 2027 - / - - / - - / - - / - - / - - / - 3 / 1.621 - / - - / - - / - 0 / 0.000 3 / 1.621 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 3.804 - / - - / - 0 / 0.000 4 / 3.804 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.569 - / - 0 / 0.000 3 / 1.569 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 3.961 0 / 0.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 0.788 Installation Cost / - - 3 / 2.748 / - 0 / 0.000 3 / 2.748 3 / 1.621 4 / 3.804 3 / 1.569 Continuing - 4 / 3.961 4 / 3.961 Continuing / - - Continuing / - Continuing Installation Schedule FY 2025 FY 2026 PYS Q1 Q2 Q3 Q4 Q1 Q2 In - - - - - - - Out - - - - - - - FY 2027 Q3 Q4 Q1 1 - - - 1 - FY 2028 Q2 Q3 Q4 Q1 2 1 - - - 2 1 - FY 2029 Q2 Q3 Q4 Q1 2 1 - - - 2 1 - FY 2030 Q2 Q3 Q4 Q1 2 2 - - - 2 2 - FY 2031 Q2 Q3 Q4 Q1 2 1 - - - 2 1 - Q2 Q3 Q4 TC Tot 2 2 - 3 21 3 21 - 2 2 Footnotes: (5) (3.1) DSA: Increase from FY 2026 to FY 2027 is attributed to updating ship configuration drawings for various hulls in forward deployed locations LI 2914 - Intelligence Surveillance and Reconnaiss... Navy UNCLASSIFIED Page 14 of 14 P-1 Line #63 Volume 2 - 564 === page 645 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2915 / CANES Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 4,282.327 4,282.327 4,282.327 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 439.977 439.977 439.977 534.324 534.324 534.324 493.046 - 0.000 - 493.046 - 0.000 - 493.046 0.000 493.046 493.046 493.046 529.811 529.811 529.811 532.947 532.947 532.947 504.585 504.585 - To FY 2031 Complete 514.982 514.982 - Total 1,480.868 9,312.867 1,480.868 9,312.867 - - 504.585 514.982 1,480.868 9,312.867 210.127 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 9.526 0.273 27.028 - 27.028 42.027 20.522 49.383 45.876 15.492 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Consolidated Afloat Networks and Enterprise Services (CANES) operates at the Tactical Edge which is defined as "The platforms, sites, and personnel (U. S. military, allied, coalition partners, first responders) operating at lethal risk in a battle space or crisis environment characterized by 1) a dependence on information systems and connectivity for survival and mission success, 2) high threats to the operational readiness of both information systems and connectivity, and 3) users are fully engaged, highly stressed, and dependent on the availability, integrity, and transparency of their information systems (Source(s): CNSSI 4009-2015)." CANES is the Navy's Program of Record (POR) to replace and modernize existing afloat networks with a cyber-hardened, warfighting resilient hardware, software and enterprise services infrastructure to enable information warfare from and within the tactical domain to expand the Fleets digital competitive advantage. CANES provides complete network infrastructure including hardware, software, processing, storage, and end user devices for the Unclassified, Coalition, Secret and Sensitive Compartmented Information (SCI) enclaves to a wide variety of Navy Surface Combatants, Combat Logistics Force (CLF), Submarines, Maritime Operations Centers, and Aegis Ashore sites. CANES services include application hosting, data transport and storage, system management, cyber security, email, web, chat, collaboration, and voice and video services. CANES is designed using commercial sector industry best practices of reducing the number of separate Fleet networks and drives affordability with a single engineered technical solution across the Fleet from patrol craft to aircraft carriers. As much as possible, CANES relies on Commercial Off-The-Shelf (COTS) hardware and software to reduce development time and cost, and leverages commercial Information Technology (IT) approaches to include Development, Security, and Operations (DevSecOps) to drive rapid upgrades. It allows for streamlined acquisition, contracting, sustainment, and significant lifecycle efficiencies through consolidation of multiple configuration management baselines, logistics, and training efforts into a single unified support structure. The CANES Application Integration effort provides common software governance, testing, processes, and tools to application developers, and conducts integration testing to confirm compatibility for hosted applications prior to fielding. More than two hundred (200) hosted software applications and systems - including Command and Control, Intelligence, Surveillance and Reconnaissance, Information Operations, Logistics, and Business domains - require the CANES infrastructure to operate in the tactical environment. Specific programs, such as Distributed Common Ground System - Navy (DCGS-N), Global Command and Control System - Maritime (GCCS-M), Naval Tactical Command Support System (NTCSS), and Undersea Warfare Decision Support System (USW-DSS), no longer provide their own independent network hardware and now depend on CANES to field, host, and sustain their capabilities. CANES also provides a set of capabilities called Agile Core Services (ACS) which brings advanced data science capabilities and other common network services to allow hosted application developers to focus on the unique capabilities they provide. CANES is funded and programmed to field regular technical updates via a Continuous Capability Delivery (CCD) Framework in order to keep pace with rapidly evolving cyber security threats and meet emerging operational demands. CANES uses a DevSecOps framework to improve its engineering processes and speed the deployment of new cyber security, application hosting and technical updates. Future CANES LI 2915 - CANES Navy UNCLASSIFIED Page 1 of 14 P-1 Line #64 Volume 2 - 565 === page 646 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2915 / CANES Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 systems will incorporate technologies such as Cloud computing, Machine learning, and Artificial Intelligence. Continuous technical insertions via the CCD Framework that integrates modular Cyber Threat Upgrades (CTUs) not only enhances network resilience but also provides updates across multiple platforms, enabling the Navy's path to continuous readiness. CANES is a mature program with an innovative Multi Award Contract (MAC) in place that has consistently proven capable of delivering on or ahead of schedule. Additionally, the program uses a robust Continuous Process Improvement (CPI) program to improve the delivery speed and quality of network capabilities to the Fleet. [P3A / 5F010/5F777 CANES - Afloat Non-MIP]: The FY2027 funding increase in the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available platform (ship/submarine/ shore) modernization windows and the program's capacity to procure and install the product. [P3A - 2 / 5F010/5F776 CANES - Ashore Non-MIP]: The FY2027 funding increase in the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available platform (ship/ submarine/shore) modernization windows and the program's capacity to procure and install the product. LI 2915 - CANES Navy UNCLASSIFIED Page 2 of 14 P-1 Line #64 Volume 2 - 566 === page 647 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2915 / CANES Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 Exhibits Schedule Exhibit Type Title* P-5 1 / Consolidated Prior Year Requirements P-3a 1 / 5F010/5F777 CANES - Afloat Non-MIP (TBD) P-3a 2 / 5F010/5F776 CANES - Ashore Non-MIP (TBD) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Title* P-5 1 / Consolidated Prior Year Requirements P-3a 1 / 5F010/5F777 CANES - Afloat Non-MIP (TBD) P-3a 2 / 5F010/5F776 CANES - Ashore Non-MIP (TBD) P-40 Total Gross/Weapon System Cost FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 330.635 - Subexhibits ID CD MDAP/ MAIS Code - / 3,890.823 - Exhibits Schedule Exhibit Type Prior Years / 0.000 - / 428.055 / 60.869 - / 11.922 / 4,282.327 - / 439.977 - / 0.000 - / 530.408 - - / 3.916 - / 534.324 - / 0.000 - / 0.000 / 487.766 - / 0.000 / 5.280 - / 0.000 / 493.046 - / 0.000 - / 0.000 - / 487.766 - / 5.280 - / 493.046 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / / 528.535 - / 1.276 / 529.811 - / / 532.947 - / 0.000 / 532.947 - / / 500.171 - / 4.414 / 504.585 / / 509.082 - - / 5.900 / 514.982 - / - / 1,411.039 - / 69.829 / 1,480.868 - / - / 8,818.826 / 163.406 / 9,312.867 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 funding request for the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available ship platform (ship/submarine/shore) modernization windows and the program's capacity to procure and install the product. Sufficient funding ensures that CANES is deployed to the Fleet as quickly as possible to mitigate obsolescence issues, cyber security threats, and keep pace with increased computing and storage requirements for hosted mission applications, and support Department of War (DoW) directives to remove End of Life/Support (EOL/S) Windows Operating Systems software (e.g., operating systems) from the Fleet as quickly as feasible. Obsolete Commercial Off-The-Shelf (COTS) legacy hardware and the termination of cyber security support for legacy versions of COTS software products (e.g., Microsoft, RedHat, Linux) drive increased sustainment costs, reduce operational availability and create critical cyber security vulnerabilities in Navy Tactical Networks. Replacing these older networks and modernizing the tactical environment with CANES is the foundation for all Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) investments to sustain functionality, interoperability, cyber security, supportability, and maintainability. FY2027 - CANES funds are for the procurement of (6) Initial CANES Afloat units, (27) Afloat Technical Insertion (TI) units and (1) Ashore TI unit; with integration and associated costs for pre-installation design and the installation of (5) Initial CANES Afloat units, (20) Afloat TI units and (1) Ashore TI unit that were procured in FY2026. Prior to FY2025, Agile Enclave (AE) was previously budgeted within the CANES Afloat Technical Insertion (1.1.2) BKit Cost Element. Starting in FY25, AE procurements and installations are reflected in a separate Afloat BKit Cost Element (1.1.3 - Agile Enclave). In FY2027, (108) AE units are planned for rapid procurement and deployment of AE capabilities across Naval platforms based on urgent and emerging Fleet needs. AE delivers capabilities in accordance with Joint Department of War priorities supporting real world operations. Additional details on AE efforts are provided at a higher classification. It is important to note that procurement quantities are the same CANES end item products referenced in CANES INTELL, LI 2925. Installation quantities represent sites receiving CANES also referenced in LI 2925. The associated dollars in this exhibit represent the non-Intel portion of the investment in the CANES system. LI 2915 - CANES Navy UNCLASSIFIED Page 3 of 14 P-1 Line #64 Volume 2 - 567 === page 648 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Consolidated Prior Year Requirements MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 330.635 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 330.635 Plus CY Advance Procurement ($ in Millions) - - - - - 0.000 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 330.635 FY 2027 Total - - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Consolidated Prior Year Requirements Cost Non Recurring Cost 1.1.1) Consolidated Prior Year Requirements - - 330.635 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 330.635 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway Consolidated Prior Year Requirements Cost - - 330.635 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 330.635 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Remarks: Consolidated Prior Year Requirements consist of: 1) CANES European Reassurance Initiative, 2) Operation Rolling Tide, and 3) Automated Digital Network System. LI 2915 - CANES Navy UNCLASSIFIED Page 4 of 14 P-1 Line #64 Volume 2 - 568 === page 649 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2915 / CANES ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: Prior Years 3,890.823 3,890.823 3,890.823 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 428.055 428.055 428.055 530.408 530.408 530.408 487.766 - 0.000 - 487.766 - 0.000 - 487.766 0.000 487.766 487.766 487.766 528.535 528.535 528.535 532.947 532.947 532.947 500.171 500.171 500.171 To FY 2031 Complete 509.082 509.082 509.082 Total 1,411.039 8,818.826 1,411.039 8,818.826 1,411.039 8,818.826 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The FY2027 funding request for the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available ship platform (ship/submarine/shore) modernization windows and the program's capacity to procure and install the product. Sufficient funding ensures that CANES is deployed to the Fleet as quickly as possible to mitigate obsolescence issues, cyber security threats, and keep pace with increased computing and storage requirements for hosted mission applications, and support Department of War (DoW) directives to remove End of Life/Support (EOL/S) Windows Operating Systems software (e.g., operating systems) from the Fleet as quickly as feasible. Obsolete Commercial Off-The-Shelf (COTS) legacy hardware and the termination of cyber security support for legacy versions of COTS software products (e.g., Microsoft, RedHat, Linux) drive increased sustainment costs, reduce operational availability and create critical cyber security vulnerabilities in Navy Tactical Networks. Replacing these older networks and modernizing the tactical environment with CANES is the foundation for all Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) investments to sustain functionality, interoperability, cyber security, supportability, and maintainability. FY2027 - CANES funds are for the procurement of (6) Initial CANES Afloat units, (27) Afloat Technical Insertion (TI) units and (1) Ashore TI unit; with integration and associated costs for pre-installation design and the installation of (5) Initial CANES Afloat units, (20) Afloat TI units and (1) Ashore TI unit that were procured in FY2026. Prior to FY2025, Agile Enclave (AE) was previously budgeted within the CANES Afloat Technical Insertion (1.1.2) BKit Cost Element. Starting in FY2025, AE procurements and installations are reflected in a separate Afloat BKit Cost Element (1.1.3 - Agile Enclave). In FY2027, (119) AE units are planned for rapid procurement and deployment of AE capabilities across Naval platforms based on urgent and emerging Fleet needs. AE delivers capabilities in accordance with Joint Department of War priorities supporting real world operations. Additional details on AE efforts are provided at a higher classification. It is important to note that procurement quantities are the same CANES end item products referenced in CANES INTELL, LI 2925. Installation quantities represent sites receiving CANES also referenced in LI 2925. The associated dollars in this exhibit represent the non-Intel portion of the investment in the CANES system. LI 2915 - CANES Navy UNCLASSIFIED Page 5 of 14 P-1 Line #64 Volume 2 - 569 === page 650 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: 5F010/5F777 CANES - Afloat Non-MIP B Kits Recurring 1.1.1) CANES - Afloat 5F010/5F777 (Non-MIP) NonOrganic (1) 1.1.2) CANES - Afloat Technical Insertion (Non-MIP) NonOrganic (2) 1.1.3) Agile Enclave - NonOrganic 184 / 1,113.491 4 / 23.010 5 / 29.319 6 / 36.238 - / - 6 / 36.238 4 / 24.883 1 / 6.407 178 / 906.490 47 / 238.768 20 / 103.568 27 / 144.012 - / - 27 / 144.012 30 / 165.613 33 / 187.640 27 / 159.664 30 / 182.727 2 / 2.535 125 / 162.831 108 / 145.188 - / - 108 / 145.188 105 / 145.813 104 / 148.902 105 / 154.844 105 / 159.489 - (3) Subtotal: Recurring / 2,019.981 - Subtotal: 5F010/5F777 CANES - Afloat Non-MIP Subtotal: Procurement, All Modification Items / - 362 / 2,019.981 / 2,019.981 - / 264.313 - 53 / 264.313 / 264.313 - / 295.718 - 150 / 295.718 / 295.718 - / 325.438 - / - - 141 / 325.438 - / - 141 / 325.438 / 325.438 - / - - - - / 325.438 / 325.438 / 336.309 - 139 / 336.309 / 336.309 - / 342.949 - 138 / 342.949 / 342.949 - - / - / 314.508 - 132 / 314.508 / 314.508 - - / - / 342.216 - 135 / 342.216 / 342.216 - - / - 204 / 1,233.348 61 / 1,041.523 453 / 3,130.005 - / - / 1,041.523 - 654 / 919.602 / 5,282.955 - 61 / 1,041.523 / 1,041.523 - 1,311 / 5,282.955 / 5,282.955 - Support (All Modification Items) 2.1) CANES - Afloat Production Support (Non-MIP) 2.2) CANES - Afloat Design Service Agent (Non-MIP) 2.3) Agile Enclave Production Support - (4) - (5) / 100.168 - / 149.504 - - (6) Subtotal: Support - / 0.000 / 11.640 - / 249.672 - - / 14.991 - / 8.647 - / 0.000 - / 8.647 - / 9.549 - / 7.588 - / 7.990 - / 8.852 - / 10.537 - / 7.273 - / 5.457 - / 0.000 - / 5.457 - / 5.686 - / 4.191 - / 4.250 - / 4.684 / 0.000 - / 0.000 - / 7.331 - / 0.000 - / 7.331 - / 7.307 - / 7.436 - / 6.854 - / 7.202 / 22.177 - / 22.264 - / 21.435 / - - - / 21.435 - / 22.542 - / 19.215 - / 19.094 - / 31.061 - / 24.219 - - / 20.738 - / - / 200.486 / 215.801 - / 55.280 - / 36.130 / 452.417 Installation Modification Item 1 of 1: 5F010/5F777 CANES - Afloat Non-MIP - / 1,621.170 - / 141.565 - / 212.426 - / 140.893 Subtotal: Installation - / 1,621.170 - / 141.565 - / 212.426 - / 140.893 - / 0.000 - / 140.893 - / 169.684 - / 170.783 - / 166.569 - / 146.128 - / 314.236 - / 3,083.454 / - - / 140.893 - / 169.684 - / 170.783 - / 166.569 - / 146.128 - / 314.236 - / 3,083.454 - Total Total Cost (Procurement + Support + Installation) LI 2915 - CANES Navy 3,890.823 428.055 530.408 487.766 0.000 UNCLASSIFIED Page 6 of 14 487.766 528.535 532.947 P-1 Line #64 500.171 509.082 1,411.039 8,818.826 Volume 2 - 570 === page 651 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: Modification Item 1 of 1: 5F010/5F777 CANES - Afloat Non-MIP Manufacturer Information Manufacturer Name: Multiple Vendors (CANES - Afloat 5F010/5F777) Manufacturer Location: Various (7) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Delivery Dates May 2025 May 2026 May 2027 May 2028 May 2029 Manufacturer Name: Multiple Vendors (CANES - Afloat Technical Insertion) FY 2030 FY 2031 Manufacturer Location: Various (8) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates May 2025 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Manufacturer Name: VARIOUS (CANES Afloat AE) Manufacturer Location: VARIOUS (9) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CANES - Afloat 5F010/5F777 (Non-MIP) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 180 / 1,183.078 4 / 21.937 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 184 / 1,205.015 FY 2025 - / - - / - 4 / 22.534 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 22.534 FY 2026 - / - - / - - / - 5 / 29.091 - / - - / - - / - - / - 0 / 0.000 5 / 29.091 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 35.957 - / - - / - - / - 0 / 0.000 6 / 35.957 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 24.690 - / - - / - 0 / 0.000 4 / 24.690 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.358 - / - 0 / 0.000 1 / 6.358 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost LI 2915 - CANES Navy 5 / 29.091 0 / 0.000 UNCLASSIFIED Page 7 of 14 P-1 Line #64 Volume 2 - 571 === page 652 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: Modification Item 1 of 1: 5F010/5F777 CANES - Afloat Non-MIP Installation Information Method of Implementation: [none specified]:: Installation Name: CANES - Afloat 5F010/5F777 (Non-MIP) Installation Cost Total Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 180 / 1,183.078 4 / 21.937 4 / 22.534 5 / 29.091 0 / 0.000 5 / 29.091 6 / 35.957 4 / 24.690 1 / 6.358 0 / 0.000 204 / 1,323.645 - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 180 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 2 1 1 1 1 1 - - - - - - - - 204 Out 177 3 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 2 1 1 1 1 - - - - - - - 204 1 Method of Implementation: [none specified]:: Installation Name: CANES - Afloat Technical Insertion (Non-MIP) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 133 / 438.092 45 / 118.653 - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 178 / 556.745 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 47 / 127.297 FY 2026 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 20 / 55.946 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 27 / 77.793 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 30 / 89.030 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 33 / 100.871 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 27 / 85.007 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 97.286 30 / 97.286 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 61 / 216.950 61 / 216.950 91 / 314.236 453 / 1,406.925 Installation Cost Total 133 / 438.092 / - 47 / 127.297 45 / 118.653 47 / 127.297 20 / 55.946 0 / 0.000 20 / 55.946 20 / 55.946 0 / 0.000 27 / 77.793 20 / 55.946 30 / 89.030 27 / 77.793 33 / 100.871 30 / 89.030 27 / 85.007 33 / 100.871 27 / 85.007 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 133 10 10 10 15 13 14 11 9 5 5 5 5 6 7 7 7 7 7 8 8 8 8 8 9 6 7 7 7 91 453 Out 124 9 10 10 10 15 13 14 11 9 5 5 5 5 6 7 7 7 7 7 8 8 8 8 8 9 6 7 7 98 453 LI 2915 - CANES Navy UNCLASSIFIED Page 8 of 14 P-1 Line #64 Volume 2 - 572 === page 653 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: Modification Item 1 of 1: 5F010/5F777 CANES - Afloat Non-MIP Installation Information Method of Implementation: CANES:: Installation Name: Agile Enclave (AE) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 2 / 0.975 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.975 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 125 / 62.595 FY 2027 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 108 / 55.856 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 105 / 55.934 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 104 / 57.063 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 105 / 59.340 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 105 / 61.121 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 2 / 0.975 125 / 62.595 108 / 55.856 125 / 62.595 0 / 0.000 108 / 55.856 0 / 0.000 108 / 55.856 105 / 55.934 108 / 55.856 104 / 57.063 105 / 55.934 105 / 59.340 104 / 57.063 105 / 61.121 - 105 / 59.340 / - - 105 / 61.121 / - - / - / - - 0 / 0.000 654 / 352.884 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 1 1 - - 50 50 25 - 36 36 36 - 35 35 35 - 34 35 35 - 35 35 35 - 35 35 35 - 654 Out - - - - 50 50 25 - 36 36 36 - 35 35 35 - 34 35 35 - 35 35 35 - 35 35 35 654 - 1 1 Footnotes: (1) The procurement average unit cost fluctuation is due to variance in system configuration requirements for each CANES platform type. - A CANES unit level platform (DDG/CG/LSD) requires a smaller system, supporting fewer users and applications than force level platforms (CVN/LHD/LHA/LCC) with a greater number of users and applications. For example, a CANES DDG design consists of 18 equipment racks and ~400 workstations, while a CANES CVN system consists of 51 equipment racks and ~3000 workstations. The average procurement cost (hardware, software, integration, and engineering support) for a unit level ship ranges from $5.2M to $7.5M, while the average procurement cost for a force level platform ranges from $11.8M to $15.6M, and submarine unit procurement costs range from $2.7M to $4.6M. These costs include both the MIP and non-MIP components of the CANES units. - CANES Afloat installations are performed at several fleet concentration areas supported by seven installation Multiple Award Contract (MAC) holders. The Naval Information Warfare Command (NAVWAR) Fleet Readiness Directorate (FRD) Installation Organization (FIO) has ensured sufficient Alteration Installation Teams (AIT) resources are available to meet the FY26 - 30 CANES installation plan. - CANES Afloat production units require an additional 5 months after delivery for integration, assembly and testing prior to installation start. Installations do not begin until 11 months after contract award (6 months production lead time (PLT) + 5 months integration). Total lead time, including admin lead time, is 12 months. - Installation cost fluctuations are attributed to and dependent on ship location, class, and variant of predecessor system the hull currently has installed. As an example of variant differences, if a CVN has an ISNS Delta variant installed, a CANES installation is estimated to be $18.2M. If that same CVN had a legacy Asynchronous Transfer Mode Local Area Network (ATM LAN) the CANES installation is estimated to be $22.4M. This cost difference is driven by a number of issues such as the requirement for new or additional wiring, equipment, and configuration changes. LI 2915 - CANES Navy UNCLASSIFIED Page 9 of 14 P-1 Line #64 Volume 2 - 573 === page 654 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2915 / CANES ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / 5F010/5F777 CANES - Afloat NonMIP MDAP/MAIS Code: (2) CANES Technical Insertion (TI) installations are conducted across several fleet concentration areas supported by six installation Multiple Award Contract (MAC) holders. The NAVWAR Fleet Readiness Directorate (FRD) Installation Organization (FIO) has ensured sufficient Alteration Installation Teams (AIT) resources are available to meet the FY27 CANES installation plan. - CANES Afloat technical insertion units require an additional 5 months after delivery for operational integration, assembly and testing prior to installation start. Installations do not begin until 11 months after contract award (6 months production lead time (PLT) + 5 months integration). Total lead time, including admin lead time, is 12 months. - CANES Tech Insertion units procured in FY2027 will be installed in FY2028. (3) Prior to FY2025, investments into Agile Enclave (AE) were captured in the CANES Afloat Technical Insertion (1.1.2) BKit Cost Element. Starting in FY2025, AE procurements and installations are reflected in a separate Afloat BKit Cost Element (1.1.3 - Agile Enclave). In FY2027, (108) AE units are planned for rapid procurement and deployment of AE capabilities across Naval platforms based on urgent and emerging Fleet needs. AE delivers capabilities in accordance with Joint Department of War priorities supporting real world operations. Additional details on AE efforts are provided at a higher classification. Funding for AE will provide rapid deployment of urgently needed cybersecurity upgrades as well as increased networking capability to combat rapidly emerging cyber threats to the Fleet. AE will be procured and installed in the same FY based on urgent Fleet needs due to current cyber vulnerability. FY2027 funding will procure and install (108) AE units. Increase in unit cost from FY2026 to FY2027 accounts for year over year inflation related to the procurement of hardware. (4) FY2027 production direct support costs including production testing, quality assurance, production engineering, and equipment assembly include support costs related to Afloat (Initial) and Afloat Technical Insertion. (5) (6) (7) DSA requirements must be funded one year prior to and completed before installations begin. FY2027 production direct support costs including production testing, quality assurance, production engineering, and equipment assembly include support costs related to Agile Enclave procurements. CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. (8) CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. (9) CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. LI 2915 - CANES Navy UNCLASSIFIED Page 10 of 14 P-1 Line #64 Volume 2 - 574 === page 655 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2915 / CANES ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / 5F010/5F776 CANES - Ashore NonMIP MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 60.869 11.922 3.916 5.280 0.000 5.280 1.276 0.000 4.414 5.900 69.829 - - - - - - - - - - - 60.869 11.922 3.916 5.280 0.000 5.280 1.276 0.000 4.414 5.900 69.829 - - - - - - - - - - - 60.869 11.922 3.916 5.280 0.000 5.280 1.276 0.000 4.414 5.900 69.829 Total 163.406 163.406 163.406 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The FY2027 funding increase in the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available ship platform (ship/submarine/shore) modernization windows and the program's capacity to procure and install the product. Sufficient funding ensures that CANES is deployed to the Fleet as quickly as possible to mitigate obsolescence issues, cyber security threats, and keep pace with increased computing and storage requirements for hosted mission applications, and support Department of War (DoW) directives to remove End of Life/Support (EOL/S) Windows Operating Systems software (e.g., operating systems) from the Fleet as quickly as feasible. Obsolete Commercial Off-The-Shelf (COTS) legacy hardware and the termination of cyber security support for legacy versions of COTS software products (e.g., Microsoft, RedHat, Linux) drive increased sustainment costs, reduce operational availability and create critical cyber security vulnerabilities in Navy Tactical Networks. Replacing these older networks and modernizing the tactical environment with CANES is the foundation for all Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) investments to sustain functionality, interoperability, cyber security, supportability, and maintainability. FY2027 - CANES funds are for the procurement of (6) Initial CANES Afloat units, (27) Afloat Technical Insertion (TI) units and (1) Ashore TI unit; with integration and associated costs for pre-installation design and the installation of (5) Initial CANES Afloat units, (20) Afloat TI units and (1) Ashore TI unit that were procured in FY26. Prior to FY25, Agile Enclave (AE) was previously budgeted within the CANES Afloat Technical Insertion (1.1.2) BKit Cost Element. Starting in FY2025, AE procurements and installations are reflected in a separate Afloat BKit Cost Element (1.1.3 - Agile Enclave). In FY2027, (119) AE units are planned for rapid procurement and deployment of AE capabilities across Naval platforms based on urgent and emerging Fleet needs. AE delivers capabilities in accordance with Joint Department of War priorities supporting real world operations. Additional details on AE efforts are provided at a higher classification. It is important to note that procurement quantities are the same CANES end item products referenced in CANES INTELL, LI 2925. Installation quantities represent sites receiving CANES also referenced in LI 2925. The associated dollars in this exhibit represent the non-Intel portion of the investment in the CANES system. LI 2915 - CANES Navy UNCLASSIFIED Page 11 of 14 P-1 Line #64 Volume 2 - 575 === page 656 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 2 / 5F010/5F776 CANES - Ashore NonMIP FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: 5F010/5F776 CANES Ashore Non-MIP B Kits Recurring 1.1.1) CANES - Ashore - Technical Insertion (Non-MIP) - NonOrganic (10) Subtotal: Recurring Subtotal: 5F010/5F776 CANES - Ashore Non-MIP Subtotal: Procurement, All Modification Items 13 / 42.355 - / - 1 / 3.677 / 42.355 - / - 13 / 42.355 - / - / 42.355 - / - - / 3.677 - - / 3.677 - 1 / 3.788 - / - / 3.788 - / - 1 / 3.788 - / - - / 3.788 - / - - 1 / 3.677 1 / 3.788 - / - - / - 1 / 4.139 / 3.788 - / - - / - 1 / 3.788 - / - - / - - / 3.788 - / - - / - - / 4.139 - / 4.263 - / 4.139 1 / 4.263 - - 1 / 4.139 / 4.263 1 / 4.263 23 / 39.132 / 39.132 - 23 / 39.132 / 39.132 - 40 / 97.354 / 97.354 - 40 / 97.354 / 97.354 - Support (All Modification Items) 2.1) CANES - Ashore Production Support (Non-MIP) 2.2) CANES - Ashore Design Services Agent (Non-MIP) Subtotal: Support / - - / 0.178 - / 0.189 - / - - / 0.189 - / - - / - - / 0.207 - / 0.213 - / 0.809 - - / 10.249 / 2.824 - - / 2.580 - / 0.061 - / 0.064 - / - - / 0.064 - / - - / - - / 0.068 - / 0.070 - / 1.183 - - / 14.275 / 4.420 - / 13.073 - / 2.580 - / 0.239 - / 0.253 - / - - / 0.253 - / - - / - - / 0.275 - / 0.283 - / 1.992 - / 18.695 - / 0.000 - / 1.239 / 0.000 - / 1.239 - / 1.276 / 0.000 - / 0.000 - / 1.354 - / 28.705 - / 47.357 / - - / 1.239 / - - / 1.239 - / 1.276 / - - / 1.354 - / 28.705 - / 47.357 Installation Modification Item 1 of 1: 5F010/5F776 CANES - Ashore Non-MIP - / 5.441 - / 9.342 Subtotal: Installation - / 5.441 - / 9.342 - - - / - - Total Total Cost (Procurement + Support + Installation) LI 2915 - CANES Navy 60.869 11.922 3.916 5.280 0.000 UNCLASSIFIED Page 12 of 14 5.280 1.276 0.000 P-1 Line #64 4.414 5.900 69.829 163.406 Volume 2 - 576 === page 657 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2915 / CANES Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / 5F010/5F776 CANES - Ashore NonMIP MDAP/MAIS Code: Modification Item 1 of 1: 5F010/5F776 CANES - Ashore Non-MIP Manufacturer Information Manufacturer Name: TBD (Competitive Procurement) Manufacturer Location: TBD (Competitive Procurement) (11) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 Contract Dates Nov 2024 Nov 2025 Nov 2026 FY 2028 Delivery Dates May 2025 May 2026 May 2027 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CANES - Ashore - Technical Insertion (Non-MIP) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 5.441 8 / 9.342 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 13 / 14.783 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 1 / 1.239 0 / 0.000 1 / 1.239 - / - - / - - / - - / - 0 / 0.000 1 / 1.239 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 1.276 - / - - / - - / - 0 / 0.000 1 / 1.276 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.354 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.394 1 / 1.394 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 27.311 23 / 27.311 Total 5 / 5.441 8 / 9.342 - / - 1 / 1.239 1 / 1.276 - / - - / - 1 / 1.354 24 / 28.705 40 / 47.357 Installation Cost 0 / 0.000 1 / 1.239 / - - 0 / 0.000 / - 1 / 1.354 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 2 - 2 4 - - - - - 1 - - 1 - - - - - - - - - - - - 1 - - 24 40 Out 5 - - - - - - - - - - - - - - - - 24 40 - 2 - 2 4 - 1 - - 1 - 1 Footnotes: (10) -Technical Insertion funds are for the procurement of programmed refresh units for previously installed Maritime Operation Centers (MOC). -CANES Ashore technical insertion units require an additional 5 months after delivery for operational integration, assembly and testing prior to installation start. Installations do not begin until 11 months after contract award (6 months production lead time (PLT) + 5 months integration). Total lead time, including admin lead time, is 12 months. LI 2915 - CANES Navy UNCLASSIFIED Page 13 of 14 P-1 Line #64 Volume 2 - 577 === page 658 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2915 / CANES ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / 5F010/5F776 CANES - Ashore NonMIP MDAP/MAIS Code: (11) CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. LI 2915 - CANES Navy UNCLASSIFIED Page 14 of 14 P-1 Line #64 Volume 2 - 578 === page 659 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 105.084 105.084 105.084 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 38.688 31.289 38.000 0.000 38.000 40.793 30.879 31.510 32.127 - - - - - - - - - - - 38.688 31.289 38.000 0.000 38.000 40.793 30.879 31.510 32.127 - - - - - - - - - - - 38.688 31.289 38.000 0.000 38.000 40.793 30.879 31.510 32.127 - Total 348.370 348.370 348.370 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Naval Sea Systems Command (NAVSEA) Radiation Detection, Identification and Computation (RADIAC) Program Office is responsible for the total life-cycle management of RADIAC equipment used throughout the U.S. Navy, U.S. Coast Guard, and occupational safety and health RADIACs used by the U.S. Marine Corps. Total life-cycle responsibilities include the acquisition of new equipment needed to replace obsolete and unsupportable instruments to maintain legally compliant radiological operations. The equipment includes radiation monitoring instruments that detect and measure ionizing radiation in order to ensure the safety of personnel, continuity of operations in radiological or nuclear contingencies, and protection of the environment. [P40A / M2100 - Survey Meters]: M2100. Radiation survey meters, required by 10 CFR 20 and the Navy's mission, are used to detect, measure and monitor radiation levels in support of operations involving radioactive materials. Navy operations associated with radioactive materials include operation of nuclear reactors, maintenance on radioactive systems or components, testing of components for structural integrity (X-ray), research, and medical diagnostics and treatment. Additionally, radiation survey meters are used to search for, locate and intercept radioactive material, and in responding to casualties involving radioactive materials. Where radiation survey meters are used to support operations involving radioactive material, they provide real-time information used to control personnel radiation exposure and to identify and control the spread of radioactivity. When used to search for radioactive material, they provide an extremely reliable method of identifying radioactive material while minimizing the risk to personnel conducting these operations. [P40A / Radiological Detection System]: M2100, Radiological Detection System (RDS): This is a basic RADIAC instrument used in Consequence Management and Occupational Safety and Health applications by all ships (U.S. Navy, U.S. Coast Guard and Military Sealift Command) and shore commands. It is used to survey for radioactive surface contamination pursuant to nuclear plant operations or nuclear plant maintenance; following medical procedures involving radioactive isotopes; or casualties and events that release radioactivity into the environment such as after a nuclear reactor accident or the use of weapons involving nuclear devices or radioactivity. It is also used to perform surveys for various types of radiation in order to monitor environmental conditions in areas and spaces immediately adjacent to where radioactive material is stored or used during routine operations; where nuclear plant operations occur; and where radioisotopes are used for maintenance, such as during industrial radiography operations. This instrument replaces the Navy's 30-year-old IM-265/PDQ Multi-Function RADIAC Control Unit and its probes. The RDS is being developed by the Joint Product Leader for Radiological and Nuclear Defense (JPdL-RND) to provide the Army, Navy, Marine Corps, Air Force (and some NATO allies) a Joint instrument that enables interoperability and surge support of assets from all the components to forward deployed units in a theater of operations where a radiological event arises. [P40A / Near Background Survey Meter Data]: M2100, Near Background Survey Meter Data: Test reports, Technical Manuals, Technical Repair Standards. LI 2920 - RADIAC Navy UNCLASSIFIED Page 1 of 12 P-1 Line #65 Volume 2 - 579 === page 660 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A [P40A / Near Background Survey Meter]: M2100, Near Background Survey Meter: This is a specialized RADIAC instrument used in an Occupational Safety application on forward-deployed nuclear powered vessels. It is used to survey areas for radiation levels slightly above background levels. Surveys ensure foreign nationals do not receive radiation doses from sources associated with the nuclear propulsion plant that are distinguishable from natural background. Changes in radiation level must be measured in less than two seconds. Foreign nationals are not permitted in areas which may contain elevated radiation levels. Two devices are currently in use; both are obsolete with the vendor discontinuing support in the near future. The new meter combines the functionality of both instruments. [P40A / M2100 NWCF Contract Fee]: M2100 NWCF Contract Service Fee: The contract office for hardware acquisitions is a Navy Working Capital Fund (NWCF) activity that charges a set fee for each contract award and modification. The applicable fee(s) for a given year are applied to the total value of the Cost Code hardware acquisitions. Fees vary from year to year. [P40A / M2200 - Dosimetry]: M2200. Dosimetry consists of radiation sensitive materials that are used for detecting and measuring an individual's exposure to ionizing radiation and to aid in minimizing this exposure. Dosimetry is required to be worn by personnel who work with sources of radioactivity or by personnel responding to casualties involving radioactivity. Most dosimeters are small devices that are worn on the belt, on a lanyard around the neck or attached to a shirt. Some dosimeters provide direct readout enabling the wearer to monitor and control radiation exposure. Other types of dosimeters must be removed from the wearer to be evaluated in special dosimeter readers that extract the recorded radiation exposure value from the dosimeter. Radiation exposure measured by dosimetry is recorded in individual medical records when formal tracking of the radiation exposure is required. In accordance with 10 CFR 20, dosimetry is required to be worn by personnel who work with sources of radioactivity. In the Navy this includes personnel in the Nuclear Propulsion, Nuclear Weapons, and Medical and Radiological Affairs Support programs. In these programs radiation exposure is measured by dosimetry and recorded in individual medical records for tracking purposes. Dosimetry is also worn by personnel responding to casualties involving radioactivity to control their exposure within acceptable levels. [P40A / DT-702 Card Holder]: M2200, DT-702 Card: The DT-702 card contains radiation sensitive material and is worn by personnel to monitor exposure to radiation. Elements 1, 2, and 3 are sensitive to photons (gamma-ray and x-ray) and betas and Element 4 is sensitive to photons, betas, and neutrons. DT-702 Card Holder: The DT-702 Holder is used to hold and protect the DT-702 card during use. It consists of a hard plastic case with both belt and lanyard attachments. These attachments allow the DT-702 Holder (with DT-702 Card inserted) to be easily attached to the wearer during use. The holder contains four filters corresponding to the four elements. Positions 1, 2, 3, and 4 have copper, plastic, mylar, and tin filters, respectively. Positions 1, 2, and 4 also have the holder itself providing shielding. All positions have different density thickness to help discriminate different types of radiation and energies to provide an accurate dose of record when processed through the Dose Program. [P40A / Extremity Dosimeter]: M2200, Extremity Dosimeter: An extremity dosimeter is used to measure concentrated exposure to the hands when a radiation worker is reaching into a glove box, or medical personnel are performing fluoroscopy tasks. This item is composed of three pieces: 1) a plastic ring to wear on a finger; 2) a dosimeter that measures exposure; and 3) a cap that secures the dosimeter to the ring. The cap is made to a specific thickness depending on the type of radiation the dosimeter is intended to measure. [P40A / Accident Dosimeter]: M2200, Accident Dosimeter: The Accident Dosimeter is a passive type of nuclear dosimeter capable of detecting and recording fast neutron radiation exposures. These dosimeters are used to determine radiation dose to the crew in the event of an accident affecting operation of a nuclear reactor. These dosimeters are fastened near or adjacent to reactor compartments on all Navy submarines and carriers. [P40A / Accident Dosimeter Data & Training]: M2200, Accident Dosimeter Data & Training: The Naval Dosimetry Center staff will be trained on how to evaluate the dosimeter. The vendor will supply Technical Manuals, Technical Repair Standards and Standard Calibration Procedure documentation in order for the detectors purchased to be maintained by Navy Radiation Calibration Laboratories. [P40A / Battlefield Dosimeter]: M2200, Battlefield Dosimeter: A dosimeter designed for use during nuclear or radiological events involving high energy gamma and neutron irradiation. An "event" can be a nuclear reactor accident, such as the Fukushima disaster in 2011, or an attack on, e.g., a Carrier Strike Group using a nuclear or radiological (dirty bomb) weapon. The concept of operations for such a dosimeter is that it is issued at MOP (Military Operational Posture) III to allow the commander to manage the exposure received by members of recovery teams who would be deployed in order to maintain continuity of operations. It is also used to perform triage on casualties, allowing medical personnel to most effectively allocate their resources. LI 2920 - RADIAC Navy UNCLASSIFIED Page 2 of 12 P-1 Line #65 Volume 2 - 580 === page 661 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A [P40A / Battlefield Dosimeter Cases]: M2200, Battlefield Dosimeter Cases: The Battlefield Dosimeter spends much of its time aboard ships stored in Damage Control Lockers. The instrument also has to be shipped to and from a RADIAC Calibration Laboratory to undergo periodic calibrations. Because allowances for the instruments on the various ship classes range from 12 on an LCS to 700 on a CVN, cases configured to hold different quantities (25, 50, 100) were procured to afford the necessary protection for storage and shipping while maximizing shipboard storage space efficiency. [P40A / M2200 NWCF Contract Service Fee]: M2200 NWCF Contract Service Fee: The contract officer for hardware acquisitions is a Navy Working Capital Fund (NWCF) activity that charges a set fee for each contract award and modification. The applicable fee(s) for a given year are applied to the total value of the Cost Code hardware acquisitions. Fees vary from year to year. [P40A / Electronic Personnel Dosimeter]: M2200, Electronic Personnel Dosimeter (EPD): The Navy's current EPD has been fielded since 2007. However, the current EPD is no longer manufactured. EPD units ready for issue will be depleted 25% by 2024 and will soon drop to zero. To ensure continued EPD use, the Navy's next EPD procurement of approximately 34,000 EPDs is planned. Therefore, as use and availability of the current EPD ramps down, use and availability of the next EPD will ramp up. [P40A / Navy Occupational Dosimeter System]: M2200, Navy Occupational Dosimeter System (NODS): The DT-702/PD system was designed in the 1990s and fielded in 2000 and is approaching the end of its useful life due to obsolete parts and because the vendor has not successfully addressed several other obsolescence issues. The system will not be logistically supportable after 2030. The NODS will replace it while providing improved dosimetry capabilities and the ability to consolidate legacy records currently spread across several databases. NODS will improve the Navy's capability to detect, transmit, record, and report the dose received by Navy radiation workers at occupational and accident levels, enhancing the health and safety of personnel. [P40A / M2400 - Other RADIAC]: M2400. Other RADIAC. The RADIAC Program fields 70 different families of instruments, consisting of a total of almost 43,000 instruments and 400,000 dosimeters. Those families that fall into similar functionality have been grouped here into the M2100, M2200, M2500 and M2600 Cost Codes. The M2400 Cost Code consists of instruments that have specialized functions that only they perform, and therefore would require an unmanageable and meaningless number of additional Cost Codes if each were addressed individually. In the context of the family metaphor used here, these instruments are no less important but are orphans in the sense there are not many of similar functionality with which they could be grouped. This Cost Code also supports replenishment of Ready for Issue (RFI) stocks when instruments in any Cost Code fall below stock levels sufficient to meet quarterly demand. This Cost Element (Spares) is a Continuing element that varies year-to-year based on emergent requirements and the quantity and unit cost of the item(s) being replenished. [P40A / Spares]: M2400, Spares: Purchase of additional quantities of existing models of RADIACs to replenish or supplement stocks of items due to minor increases in program allowances, inventory losses, or due to assets being beyond economical repair. [P40A / M2500 - Air Sampling Systems]: M2500. Monitoring for airborne radioactivity is done to detect leaks from nuclear reactors or associated systems to ensure that radioactivity is not inadvertently released to the environment from these operations. Additionally, monitoring for airborne radioactivity is performed during maintenance on radioactive components or during events that might cause radioactivity to be released to the air. Monitoring for airborne radioactivity is normally done by drawing air across filter paper to collect airborne radioactive particles. This filter paper is then evaluated by radiation detectors and the concentration of airborne radioactivity is calculated. The types of airborne radioactivity monitoring systems include fixed systems and portable systems. Fixed systems sample air from pre-determined locations and normally include built-in radiation detectors for determining the airborne radioactivity concentration. Portable systems can be used to sample air at any desired location, but normally require the use of separate radiation detection instruments to measure the radioactive particles deposited on the filter paper to determine the airborne radioactivity concentration. [P40A / APD Ship Frames]: M2500, Air Particle Detector (APD), Ship, Frames: The Government provides these units as Government Furnished Property (GFP) to the vendor building the IM-272/WDQ APD, into which they build and install modern components. [P40A / APD Ship]: M2500, Air Particle Detector, Ship: Airborne radioactivity monitoring system that is required for use on CVNs and all submarines. This system (IM-272A/WDQ) is a replacement for the existing IM-239/WDQ used on all Navy submarines and carriers. The IM-272A/WDQ incorporates significant technology enhancements that will reduce spurious false alarms and reduce operator maintenance. LI 2920 - RADIAC Navy UNCLASSIFIED Page 3 of 12 P-1 Line #65 Volume 2 - 581 === page 662 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A [P40A / APD Ship Conversion]: M2500, APD Ship Conversion: Under the new contract awarded in September 2019, 10 of the 30 IM-272/WDQ units procured in FY17 were converted to the IM-272A/WDQ to enable fielding. [P40A / APD Ship GFP Repair by Contractor]: M2500, Air Particle Detector, Ship GFP Repair by Contractor: The APD Ship utilizes GFP in its design. The Government prepares the GFP prior to shipment to the contractor. Certain pieces require additional work by the contractor. The Government will fund the contractor to refurbish GFP as needed in order to mitigate risks to cost and schedule. [P40A / M2500 NWCF Contract Service Fee]: M2500 NWCF Contract Service Fee: The contract officer for hardware acquisitions is a Navy Working Capital Fund (NWCF) activity that charges a set fee for each contract award and modification. The applicable fee(s) for a given year are applied to the total value of the Cost Code hardware acquisitions. Fees vary from year to year. [P40A / Battery Operated Air Samplers]: M2500, Battery Operated Air Samplers: Research and testing efforts to find a possible replacement for the HD-11510 are currently funded in RDT&E. The HD-11510 is a battery powered portable air article sampler used for radioiodine sampling by the Naval Nuclear Propulsion Program (NNPP). The HD-11510 has been fielded for over 15 years. The weight of the device at 38 pounds has been a long-standing complaint by the end user community and obsolescence issues have arisen in the past 5 years. Naval Surface Warfare Center Carderock Division (NSWCCD) is researching three possible replacements for the HD-11510. These COTS solutions will be tested at NSWCCD and the battery testing and certification is expected to be obtained for one of the three BPAPS acquired. [P40A / M2600 - Laboratory Test Equipment]: M2600. This Cost Code supports specialized equipment usually found in laboratories, hospitals and test facilities. This kind of equipment is distinct enough to warrant separating it for management purposes from the M2400 Cost Code. [P40A / Calibrators]: M2600, Calibrators: Calibrators (also known as irradiators) are the basic tool used to calibrate all Navy radiological detection equipment. They consist of a high energy radiological source (Cs-137) in a shielded container that is located in a specially constructed and shielded room, or "range." A technician places the instrument to be calibrated at a specific calibration point in the range and remotely operates the calibrator by raising the source out of its container so that the radiological source becomes exposed and it irradiates the instrument. The instrument's response to the radiation is measured so that it can be calibrated to specific tolerances. This procurement replaced the existing gamma calibrator AN/UDM-1B. [P40A / Calibrator Initial Spare Parts, Installation & Training]: M2600, Calibrator Initial Spare Parts, Installation & Training: Initial spare parts and vendor training at each of the seven RADIAC Calibration Laboratories where the equipment was installed. The vendor shipped and installed the calibrators at each of the seven Navy RADIAC Calibration Laboratories. [P40A / TS-4575/FDM Calibrator]: 2600, TS-4575/FDM Calibrator: This is an irradiator designed specifically to verify specification compliance and calibration of the IM-276/PD and IM-276A/PD Battlefield Dosimeter. The dosimeter must be checked and calibrated every three years in order to ensure it is operating within specifications. Due to the large number of fielded dosimeters, a device that can service them efficiently is needed in order to ensure the throughput at the servicing RADIAC Calibration Laboratory (RCL) can keep up with the operational tempo, and to reduce total ownership costs by automating the entire process and therefore reducing labor costs. [P40A / TS-4575/FDM Parts & Training]: M2600, TS-4575/FDM Parts & Training: Initial spare parts and training of RADIAC calibration technicians at the seven Navy RADIAC Calibration Laboratories on its operation and preventive maintenance. [P40A / M2600 NWCF Contract Service Fee]: M2600 NWCF Contract Service Fee: The contract officer for hardware acquisitions is a Navy Working Capital Fund (NWCF) activity that charges a set fee for each contract award and modification. The applicable fee(s) for a given year are applied to the total value of the Cost Code hardware acquisitions. Fees vary from year to year. [P40A / Radiation Check Source Kits]: M2600, Radiation Check Source Kits: The Cesium-137 (Cs-137) source in the MX-12xxx/S source kit series has a 30-year life span and it's reaching end of life. These source kits are assigned to various NAVY users to source check their RADIAC prior to start of shift. [P40A / M2830 - Support - Production Engineering]: M2830, Production Engineering: Labor cost of the government and contractor personnel who prepare the acquisitions. LI 2920 - RADIAC Navy UNCLASSIFIED Page 4 of 12 P-1 Line #65 Volume 2 - 582 === page 663 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A [P40A / Production Engineering Carderock]: M2830, Production Engineering: Production Engineering Labor Cost in support of NAVSEA 09RD OPN procurements. Manpower requirements include Engineers, Health Physicists, Scientists and other critical subject matter experts in acquisition life cycle management. [P40A / M2830 NWCF Contract Service Fee]: M2830 NWCF Contract Service Fee: The contract officer for service contracts is a Navy Working Capital Fund (NWCF) activity that charges a set fee for each contract award and modification. The applicable fee for a given year is applied to the total value of the contract action. Fees vary from year to year. [P40A / Production Engineering In Service Engineering Agent]: M2830, Production Engineering In Service Engineering Agent (ISEA): Labor cost of the contractor Engineers, Logisticians, Technical Writer, Program Analyst, and Systems Analysts who help prepare the acquisitions. LI 2920 - RADIAC Navy UNCLASSIFIED Page 5 of 12 P-1 Line #65 Volume 2 - 583 === page 664 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 2920 / RADIAC Program Elements for Code B Items: 0708017N Other Related Program Elements: 0603542N, 0702856N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a RADIAC P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 105.084 - / 38.688 - / 31.289 - / 38.000 - / 105.084 - / 38.688 - / 31.289 - / 38.000 - / - - / 38.000 / 0.000 - / 38.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Title 10 of the Code of Federal Regulations, Part 20 (10 CFR 20) requires RADIAC instruments be used to ensure the safety of personnel who work with or who are exposed to radioactive materials in their work. This request supports the Department of Defense National Defense Strategy objective in the areas of Human Health and Safety, by providing equipment that enables the safe and legally compliant operation of the U.S. Navy's nuclear reactors; industrial and research uses of radiation, medical radiation applications; monitoring of nuclear weapons; detection of radiological Weapons of Mass Destruction (WMD); and continuity of operations in the event of a radiological or nuclear incident. The U.S. Navy's mission requires personnel and ships to have the ability to operate in radiological environments and the ability to identify and interdict radiological WMD. U.S. Navy programs that require RADIAC instruments for Occupational Safety & Health (OSH) reasons under the provisions of 10 CFR 20 include Naval Nuclear Propulsion, Nuclear Weapons, Medical, and Radiological Affairs Support. Non-OSH programs include Radiological Defense, Consequence Management, Training, Technical (RADIAC calibration, shielding evaluation, research) and Radiological Search (maritime interdiction to locate or intercept WMD). The funding increase from FY26 to FY27 supports procurement of dosimetry systems necessary to meet mission requirements. Purchasing the required quantity in FY27 allows the program to achieve lower unit costs through bulk procurement and supports timely fielding of the capability. LI 2920 - RADIAC Navy UNCLASSIFIED Page 6 of 12 P-1 Line #65 Volume 2 - 584 === page 665 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2920 / RADIAC Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: RADIAC FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) M2100 - Survey Meters 1.1) Radiological Detection System (1)(†) B 1.2) Near Background Survey Meter Data A 1.3) Near Background A Survey Meter (†) 1.4) M2100 NWCF Contract Fee A Subtotal: 1) M2100 - Survey Meters 3,399.70 12,625.00 3,350 11.389 - 0.196 56 2,397.38 5,199 12.464 - - - 0.707 - - 5,364.17 2,232 11.973 - - - - - - 2,118.15 7,059 14.952 - - - - - - - - - - - - - - - 2,118.15 7,059 14.952 - - - - - - - - - 0.162 - - 0.040 - - 0.031 - - 0.045 - - - - - 0.045 - - 12.454 - - 12.504 - - 12.004 - - 14.997 - - - - - 14.997 57.17 26,606 1.521 70.68 20,020 1.415 72.79 20,020 1.457 - - - - - - - - - 13.30 30,000 0.399 - - - - - - - - - - - - - - - 169.64 2,240 0.380 - - - - - - - - - - - - - - - - - 0.132 - - - - - - - - - - - - - - - 241.02 76,488 18.435 - - - - - - - - - - - - - - - 399.82 1,083 0.433 - - - - - - - - - - - - - - - - - 1.554 - - 0.747 - - 0.749 - - 0.691 - - - - - 0.691 1,320 1.494 526.97 5,100 2.688 435.73 6,130 2.671 409.44 8,050 3.296 - - - 409.44 8,050 3.296 - - - 1,256.35 15,100 18.971 703.20 15,300 10.759 394.46 40,600 16.015 - - - 394.46 40,600 16.015 - - 24.348 - - 23.821 - - 15.636 - - 20.002 - - - - - 20.002 - - 7.645 - - - - - 0.458 - - 0.615 - - - - - 0.615 - - 7.645 - - - - - 0.458 - - 0.615 - - - - - 0.615 9,384.07 427 4.007 - - - - - - - - - - - - - - - 48,014.29 280 13.444 - - - - - - - - - - - - - - - 2) M2200 - Dosimetry 2.1) DT-702 Card Holder (†) 2.2) Extremity Dosimeter A (†) 2.3) Accident Dosimeter A A (†) 2.4) Accident Dosimeter Data & Training A 2.5) Battlefield A Dosimeter (†) 2.6) Battlefield (†) A Dosimeter Cases 2.7) M2200 NWCF Contract Service Fee A 2.8) Electronic Personnel A Dosimeter (†) 2.9) Navy Occupational Dosimeter System 1,131.82 A (2)(†) Subtotal: 2) M2200 - Dosimetry 3) M2400 - Other RADIAC 3.1) Spares A Subtotal: 3) M2400 - Other RADIAC 4) M2500 - Air Sampling Systems 4.1) APD Ship (†) A Frames (†) 4.2) APD Ship LI 2920 - RADIAC Navy A UNCLASSIFIED Page 7 of 12 P-1 Line #65 Volume 2 - 585 === page 666 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2920 / RADIAC Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.3) APD Ship A (†) MAIS Code Unit Cost Conversion 4.4) APD Ship GFP Repair by Contractor A 4.5) M2500 NWCF Contract Service Fee A ($) 30,800.00 Subtotal: 4) M2500 - Air Sampling Systems FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: RADIAC Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 10 0.308 - - - - - - - - - - - - - - - - - 0.300 - - - - - 0.092 - - - - - - - - - - - 2.008 - - - - - 0.001 - - - - - - - - - - - 20.067 - - - - - 0.093 - - - - - - - - - 13 4.924 573,580.00 0.219 - - - - 0.656 - - - - - - - - - - - - - - - 0.407 - - - - - - - - - - - - - - - 5) M2600 - Laboratory Test Equipment 5.1) Calibrators (†) A 5.2) Calibrator Initial Spare Parts, Installation & Training A 5.3) TS-4575/FDM A Calibrator (†) 5.4) TS-4575/FDM Parts & Training A 5.5) M2600 NWCF Contract Service Fee A 378,769.23 203,500.00 2 1 0.574 226,000.00 1 0.226 219,000.00 1 219,000.00 1 0.219 - - 0.040 - - - - - - - - - - - - - - - - - 0.526 - - 0.049 - - 0.028 - - 0.027 - - - - - 0.027 - - 6.553 - - 0.623 - - 0.254 - - 0.246 - - - - - 0.246 - - 20.134 - - 1.261 - - 1.672 - - 1.800 - - - - - 1.800 - - 0.106 - - 0.011 - - 0.028 - - 0.020 - - - - - 0.020 - - 13.777 - - 0.468 - - 1.144 - - 0.320 - - - - - 0.320 Subtotal: 6) M2830 - Support Production Engineering - - 34.017 - - 1.740 - - 2.844 - - 2.140 - - - - - 2.140 Total - - 105.084 - - 38.688 - - 31.289 - - 38.000 - - - - - 38.000 Subtotal: 5) M2600 - Laboratory Test Equipment 6) M2830 - Support - Production Engineering 6.1) Production Engineering Carderock A 6.2) M2830 NWCF Contract Service Fee A 6.3) Production Engineering In Service Engineering Agent A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) M2100, Radiological Detection System (RDS): This procurement involves 17 different line items, ranging in cost from $34 for a power cord to $4,546 for a Control Unit plus Neutron Probe, which is just one of eight configurations in which a Control Unit will be bought with a different type of probe (Alpha, Beta, Neutron, Photon, Scintillation, and Field Instrument for the Detection of Low Energy Radiation (FIDLER)). Quantities required for each of the line items also vary widely, from five Scintillation Probes to approximately 9,681 Control Units. To keep this exhibit simple, the quantities provided in each year are a combination of several of the line items in various configurations. This also means that the unit cost year-to-year is not based on inflation of any specific end item, but rather a reflection of the various line items being procured that year in their various quantities and widely varying costs. LI 2920 - RADIAC Navy UNCLASSIFIED Page 8 of 12 P-1 Line #65 Volume 2 - 586 === page 667 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2920 / RADIAC Aggregated Items Title: RADIAC (2) M2200, Navy Occupational Dosimetry System (NODS): NODS will consist of approximately 150,000 dosimeters, 2,850 readers/base stations, logistics hardware, and the infrastructure needed to maintain the NODS for its lifecycle, while providing NNPP with the passive/active system Naval Reactors has made a requirement in order to efficiently detect, transmit, record, and report the dose received by Navy radiation workers. Also, the associated software package called Navy Radiation Exposure Management System (NAVREMS) will have the capability of managing, consolidating and standardizing the dose records of personnel while eliminating stand-alone, unintegrated legacy databases. LI 2920 - RADIAC Navy UNCLASSIFIED Page 9 of 12 P-1 Line #65 Volume 2 - 587 === page 668 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Aggregated Items: RADIAC FY Contractor and Location Method/Type or Funding Vehicle 2023 VPI Technology Group / Draper, UT C / CPIF Aberdeen Aug 2023 May 2024 356 4,080.00 Y Jan 2016 2024 VPI Technology Group / Draper, UT C / CPIF Aberdeen Aug 2024 May 2025 2,994 3,319.00 Y Jan 2016 2025 VPI Technology Group / Draper, UT C / CPIF Aberdeen Aug 2025 May 2026 5,199 2,397.38 Y Jan 2016 2026 TBD / UNKNOWN C / TBD Aberdeen Sep 2026 Mar 2027 2,232 5,364.17 Y Oct 2025 (1) 2027 TBD / UNKNOWN C / TBD Aberdeen Sep 2027 Mar 2028 7,059 2,118.15 Y Oct 2025 1.3) Near Background Survey Meter 2022 Ludlum Measurements INC / Sweetwater, TX C / FFP NSWC Carderock Aug 2022 Oct 2023 6 16,666.67 Y Jan 2022 1.3) Near Background Survey Meter 2023 Ludlum Measurements INC / Sweetwater, TX C / FFP NSWC Carderock Mar 2023 Mar 2024 25 18,331.00 Y Jan 2022 1.3) Near Background Survey Meter 2024 Ludlum Measurements INC / Sweetwater, TX C / FFP NSWC Carderock Jul 2024 Jul 2025 25 5,960.00 Y Jan 2022 2022 Thermo Fisher Scientific / Franklin, MA / UNKNOWN SS / FFP NSWC Carderock Aug 2022 Nov 2022 6,788 23.57 Y Jun 2021 2024 Thermo Fisher Scientific / Franklin, MA / UNKNOWN SS / FFP NSWC Carderock May 2024 Nov 2024 19,818 68.65 Y Dec 2023 2025 Thermo Fisher Scientific / Franklin, MA / UNKNOWN SS / FFP NSWC Carderock Mar 2025 Jun 2025 20,020 70.68 Y Dec 2023 2026 Thermo Fisher Scientific / Franklin, MA / UNKNOWN C / TBD NSWC Carderock Mar 2026 Jun 2026 20,020 72.79 Y Dec 2023 2021 Thermo Fisher Scientific / Franklin, MA / Bedford, MA SS / FFP NSWC Carderock Jul 2021 Oct 2021 9,000 15.00 Y Jun 2021 2020 Rotunda Scientific Technologies / Mansfield, OH 44902 C / FFP NSWC Carderock Nov 2020 Feb 2021 580 160.00 Y Apr 2020 2021 Rotunda Scientific Technologies / Mansfield, OH 44902 C / FFP NSWC Carderock Mar 2021 Jun 2021 580 170.00 Y Apr 2020 2022 Rotunda Scientific Technologies / Mansfield, OH 44902 C / FFP NSWC Carderock Oct 2021 Jan 2022 1,080 174.00 Y Apr 2020 2020 Radiation Safety & Control Services / Stratham, NH SS / IDIQ NSWC Carderock Mar 2020 Sep 2020 5,045 227.25 Y May 2017 2021 Radiation Safety & Control Services / UNKNOWN C / FFP NSWC Carderock May 2021 Dec 2021 8,900 250.00 Y Mar 2020 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2920 / RADIAC Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) M2100 - Survey Meters 1.1) Radiological Detection System (1) 1.1) Radiological Detection System (1) 1.1) Radiological Detection System (1) 1.1) Radiological Detection System (1) 1.1) Radiological Detection System 2) M2200 - Dosimetry 2.1) DT-702 Card Holder 2.1) DT-702 Card Holder 2.1) DT-702 Card Holder 2.1) DT-702 Card Holder 2.2) Extremity Dosimeter 2.3) Accident Dosimeter 2.3) Accident Dosimeter 2.3) Accident Dosimeter 2.5) Battlefield Dosimeter 2.5) Battlefield Dosimeter LI 2920 - RADIAC Navy UNCLASSIFIED Page 10 of 12 P-1 Line #65 Volume 2 - 588 === page 669 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2920 / RADIAC Method/Type or Funding Vehicle Aggregated Items: RADIAC Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2020 Radiation Safety & Control Services / UNKNOWN SS / IDIQ NSWC Carderock Mar 2020 Sep 2020 114 403.51 Y May 2017 2021 Radiation Safety & Control Services / Stratham, NH C / FFP NSWC Carderock May 2021 Dec 2021 105 419.05 Y Mar 2020 2.8) Electronic Personnel Dosimeter 2024 Mirion Technologies / Atlanta, GA C / FFP NSWC Carderock Sep 2024 Sep 2026 1,320 1,131.80 Y May 2024 2.8) Electronic Personnel Dosimeter 2025 Mirion Technologies / Atlanta, GA C / FFP NSWC Carderock Jun 2025 Dec 2026 5,100 526.97 Y May 2024 2.8) Electronic Personnel Dosimeter 2026 Mirion Technologies / Atlanta, GA C / FFP NSWC Carderock Mar 2026 Sep 2027 6,130 435.73 Y May 2024 2.8) Electronic Personnel Dosimeter 2027 Mirion Technologies / Atlanta, GA C / FFP NSWC Carderock Mar 2027 Sep 2028 8,050 409.44 Y May 2024 2025 Fisher Bioservices Inc / Rockville, MD C / FFP NSWC Carderock Jun 2025 Sep 2026 15,100 1,256.35 Y Jul 2024 2026 Fisher Bioservices Inc / Rockville, MD C / FFP NSWC Carderock Mar 2026 Jun 2027 15,300 703.20 Y Jul 2024 2027 Fisher Bioservices Inc / Rockville, MD C / FFP NSWC Carderock Mar 2027 Jun 2028 40,600 394.46 Y Jul 2024 4.1) APD Ship Frames 2020 Puget Sound NSY / Bremerton, WA WR ** NO PCO ** Nov 2019 Mar 2020 21 8,800.00 Y 4.1) APD Ship Frames 2021 Puget Sound NSY / Bremerton, WA WR ** NO PCO ** Dec 2020 Apr 2021 60 12,970.00 Y 4.1) APD Ship Frames 2022 Puget Sound NSY / Bremerton, WA WR ** NO PCO ** Dec 2021 Apr 2022 93 9,156.00 Y 4.1) APD Ship Frames 2023 Puget Sound NSY / Bremerton, WA WR ** NO PCO ** Dec 2022 Apr 2023 53 9,745.00 Y 4.2) APD Ship 2019 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Sep 2019 Oct 2021 26 44,571.31 Y Jun 2019 4.2) APD Ship 2020 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Sep 2020 Sep 2021 15 42,810.04 Y Jun 2019 4.2) APD Ship 2021 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Jun 2021 Jun 2023 80 37,382.67 Y Jun 2019 4.2) APD Ship 2022 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Mar 2022 Mar 2025 80 38,126.39 Y Jun 2019 4.2) APD Ship 2023 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Mar 2023 Mar 2026 53 41,580.00 Y Jun 2019 4.3) APD Ship Conversion 2021 Spectral Labs, Inc. / San Diego, CA C / FFP NSWC Carderock Mar 2021 Sep 2021 10 30,790.00 Y Jun 2019 5.1) Calibrators 2021 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Dec 2020 Dec 2022 3 330,441.00 Y Oct 2019 5.1) Calibrators 2022 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Nov 2021 May 2025 3 340,566.00 Y Oct 2019 5.1) Calibrators 2023 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Oct 2022 Apr 2026 3 355,673.00 Y Oct 2019 5.1) Calibrators 2024 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Oct 2023 Apr 2027 4 461,000.00 Y Oct 2019 5.1) Calibrators 2025 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Mar 2025 Dec 2025 1 573,580.00 Y Oct 2019 5.1) Calibrators 2026 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Jan 2026 Jun 2026 1 226,000.00 Y Oct 2019 2.6) Battlefield Dosimeter Cases 2.6) Battlefield Dosimeter Cases 2.9) Navy Occupational Dosimeter System (2) 2.9) Navy Occupational Dosimeter System (2) 2.9) Navy Occupational Dosimeter System (2) (Each) 4) M2500 - Air Sampling Systems 5) M2600 - Laboratory Test Equipment LI 2920 - RADIAC Navy UNCLASSIFIED Page 11 of 12 P-1 Line #65 Volume 2 - 589 === page 670 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2920 / RADIAC Method/Type or Funding Vehicle Aggregated Items: RADIAC Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 5.1) Calibrators 2027 Hopewell Designs, Inc. / Augusta, GA C / FFP NSWC Carderock Jan 2027 Jun 2027 1 219,000.00 Y Oct 2019 5.3) TS-4575/FDM Calibrator 2021 Hopewell Designs, Inc. / Augusta, GA SS / FFP NSWC Carderock Apr 2021 Oct 2021 2 203,625.00 Y Dec 2018 LI 2920 - RADIAC Navy UNCLASSIFIED Page 12 of 12 P-1 Line #65 (Each) Volume 2 - 590 === page 671 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2925 / CANES Intell Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 623.927 623.927 623.927 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 50.654 46.281 43.028 0.000 43.028 45.653 49.271 47.162 48.127 - - - - - - - - - 50.654 46.281 43.028 0.000 43.028 45.653 49.271 47.162 48.127 Total 130.090 1,084.193 130.090 - - - - - - - - - 50.654 46.281 43.028 0.000 43.028 45.653 49.271 47.162 48.127 11.231 Continuing 1,084.193 130.090 1,084.193 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.552 - 3.904 - 3.904 4.961 5.222 12.087 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Consolidated Afloat Networks and Enterprise Services (CANES) operates at the Tactical Edge which is defined as "The platforms, sites, and personnel (U. S. military, allied, coalition partners, first responders) operating at lethal risk in a battle space or crisis environment characterized by 1) a dependence on information systems and connectivity for survival and mission success, 2) high threats to the operational readiness of both information systems and connectivity, and 3) users are fully engaged, highly stressed, and dependent on the availability, integrity, and transparency of their information systems (Source(s): CNSSI 4009-2015)." CANES is the Navy's Program of Record (POR) to replace and modernize existing afloat networks with a cyber-hardened, warfighting resilient hardware, software and enterprise services infrastructure to enable information warfare from and within the tactical domain to expand the Fleets digital competitive advantage. CANES provides complete network infrastructure including hardware, software, processing, storage, and end user devices for the Unclassified, Coalition, Secret and Sensitive Compartmented Information (SCI) enclaves to a wide variety of Navy Surface Combatants, Combat Logistics Force (CLF), Submarines, Maritime Operations Centers, and Aegis Ashore sites. CANES services include application hosting, data transport and storage, system management, cyber security, email, web, chat, collaboration, and voice and video services. CANES is designed using commercial sector industry best practices of reducing the number of separate Fleet networks and drives affordability with a single engineered technical solution across the Fleet from patrol craft to aircraft carriers. As much as possible, CANES relies on Commercial Off-The-Shelf (COTS) hardware and software to reduce development time and cost, and leverages commercial Information Technology (IT) approaches to include Development, Security, and Operations (DevSecOps) to drive rapid upgrades. It allows for streamlined acquisition, contracting, sustainment, and significant lifecycle efficiencies through consolidation of multiple configuration management baselines, logistics, and training efforts into a single unified support structure. The CANES Application Integration effort provides common software governance, testing, processes, and tools to application developers, and conducts integration testing to confirm compatibility for hosted applications prior to fielding. More than two hundred (200) hosted software applications and systems - including Command and Control, Intelligence, Surveillance and Reconnaissance, Information Operations, Logistics, and Business domains - require the CANES infrastructure to operate in the tactical environment. Specific programs, such as Distributed Common Ground System - Navy (DCGS-N), Global Command and Control System - Maritime (GCCS-M), Naval Tactical Command Support System (NTCSS), and Undersea Warfare Decision Support System (USW-DSS), no longer provide their own independent network hardware and now depend on CANES to field, host, and sustain their capabilities. CANES also provides a set of capabilities called Agile Core Services (ACS) which brings advanced data science capabilities and other common network services to allow hosted application developers to focus on the unique capabilities they provide. CANES is funded and programmed to field regular technical updates via a Continuous Capability Delivery (CCD) Framework in order to keep pace with rapidly evolving cyber security threats and meet emerging operational demands. CANES uses a DevSecOps framework to improve its engineering processes and speed the deployment of new cyber security, application hosting and technical updates. Future CANES LI 2925 - CANES Intell Navy UNCLASSIFIED Page 1 of 11 P-1 Line #66 Volume 2 - 591 === page 672 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2925 / CANES Intell Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 systems will incorporate technologies such as Cloud computing, Machine learning, and Artificial Intelligence. Continuous technical insertions via the CCD Framework that integrates modular Cyber Threat Upgrades (CTUs) not only enhances network resilience but also provides updates across multiple platforms, enabling the Navy's path to continuous readiness. CANES is a mature program with an innovative Multi Award Contract (MAC) in place that has consistently proven capable of delivering on or ahead of schedule. Additionally, the program uses a robust Continuous Process Improvement (CPI) program to improve the delivery speed and quality of network capabilities to the Fleet. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 2 of 11 P-1 Line #66 Volume 2 - 592 === page 673 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2925 / CANES Intell Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: M417 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / CANES Intell - / 64.380 - / 1.540 - / 0.468 - / 0.710 - / 0.000 - / 0.710 P-3a 1 / CANES-Afloat 5G010/5G777 MIP (TBD) - / 559.547 - / 49.114 - / 45.813 - / 42.318 - / 0.000 - / 42.318 P-40 Total Gross/Weapon System Cost - / 623.927 - / 50.654 - / 46.281 - / 43.028 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 43.028 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / CANES Intell P-3a 1 / CANES-Afloat 5G010/5G777 MIP (TBD) P-5a - / 45.406 - / 49.271 - / 46.633 - / 47.319 - / 124.641 - / 1,010.062 P-40 Total Gross/Weapon System Cost - / 45.653 - / 49.271 - / 47.162 - / 48.127 - / 130.090 - / 1,084.193 - / - - / - - / - - / - - / - - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 funding decrease in the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available ship platform (ship/submarine/shore) modernization windows and the program's capacity to procure and install the product. Sufficient funding ensures that CANES is deployed to the Fleet as quickly as possible to mitigate obsolescence issues, cyber security threats, and keep pace with increased computing and storage requirements for hosted mission applications, and support Department of War (DoW) directives to remove End of Life/Support (EOL/S) Windows Operating Systems software (e.g., operating systems) from the Fleet as quickly as feasible. Obsolete Commercial Off-The-Shelf (COTS) legacy hardware and the termination of cyber security support for legacy versions of COTS software products (e.g., Microsoft, RedHat, Linux) drive increased sustainment costs, reduce operational availability and create critical cyber security vulnerabilities in Navy Tactical Networks. Replacing these older networks and modernizing the tactical environment with CANES is the foundation for all Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) investments to sustain functionality, interoperability, cyber security, supportability, and maintainability. FY2027 - CANES funds are for the procurement of (6) Initial CANES Afloat units, (27) Afloat Technical Insertion (TI) units and (1) Ashore TI unit; with integration and associated costs for pre-installation design and the installation of (5) Initial CANES Afloat units, (20) Afloat TI units and (1) Ashore TI unit that were procured in FY2026. It is important to note that procurement quantities are the same CANES end item products referenced in CANES LI 2915. Installation quantities represent sites receiving CANES are also referenced in LI 2915. The associated dollars in this exhibit represent the Intel investment portion of the CANES system. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 3 of 11 P-1 Line #66 Volume 2 - 593 === page 674 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2925 / CANES Intell Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / CANES Intell MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 64.380 1.540 0.468 0.710 0.000 0.710 - - - - - - 64.380 1.540 0.468 0.710 0.000 0.710 - - - - - - 64.380 1.540 0.468 0.710 0.000 0.710 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - CANES Intell Procurement Cost Recurring Cost 1.1.1) Consolidated Prior Year Requirements - (1) 1.1.2) CANES Ashore Technical Insertion - MIP (†) (2) 282.385 - 59.172 - - 0.000 13 3.671 - - 0.000 - - 434.663 0.000 1 0.435 - - 401.489 1 0.000 - - 0.000 0.401 - - 0.000 - - 401.489 0.000 1 0.401 Subtotal: Recurring Cost - - 62.843 - - 0.000 - - 0.435 - - 0.401 - - 0.000 - - 0.401 Subtotal: Hardware CANES Intell Procurement Cost - - 62.843 - - 0.000 - - 0.435 - - 0.401 - - 0.000 - - 0.401 Hardware - CANES Intell Installations Cost Recurring Cost 2.1.1) CANES Ashore Technical Insertion Install - MIP - - 0.666 - - 1.472 - - 0.000 - - 0.277 - - 0.000 - - 0.277 Subtotal: Recurring Cost - - 0.666 - - 1.472 - - 0.000 - - 0.277 - - 0.000 - - 0.277 - - 0.666 - - 1.472 - - 0.000 - - 0.277 - - 0.000 - - 0.277 - - 0.427 - - 0.000 - - 0.020 - - 0.020 - - 0.000 - - 0.020 (3) Subtotal: Hardware CANES Intell Installations Cost Support - CANES Intell Support Cost 3.1) CANES - Ashore Production Support (MIP) LI 2925 - CANES Intell Navy UNCLASSIFIED Page 4 of 11 P-1 Line #66 Volume 2 - 594 === page 675 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 2925 / CANES Intell Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / CANES Intell MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 3.2) CANES - Ashore Design Service Agent (MIP) - - 0.444 - - 0.068 - - 0.013 - - 0.012 - - 0.000 - - 0.012 Subtotal: Support - CANES Intell Support Cost - - 0.871 - - 0.068 - - 0.033 - - 0.032 - - 0.000 - - 0.032 Gross/Weapon System Cost - - 64.380 - - 1.540 - - 0.468 - - 0.710 - - 0.000 - - 0.710 Remarks: [Hardware/Recurring] - CANES units procured in FY24 will be installed in FY25. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) Consolidated Prior Year requirements consists of Cooperative Maritime Forces Pacific (CMFP) and represents 1 total unit procured. Technical Insertion funds are for the procurement of programmed refresh units for previously installed Maritime Operation Centers (MOC). FY2026 procurements will install in FY2027. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 5 of 11 P-1 Line #66 Volume 2 - 595 === page 676 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Cost Elements 1.1.2) CANES - Ashore Technical Insertion - MIP O O C FY 2026 Contractor and Location Various (4) / Various P-1 Line Item Number / Title: 2925 / CANES Intell Method/Type or Funding Vehicle C / FFP Item Number / Title [DODIC]: 1 / CANES Intell Location of PCO Award Date Date of First Delivery ** NO PCO ** Nov 2025 May 2026 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 1 434.663 Y RFP Issue Date Aug 2025 Footnotes: (4) CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 6 of 11 P-1 Line #66 Volume 2 - 596 === page 677 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2925 / CANES Intell ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / CANES-Afloat 5G010/5G777 MIP MDAP/MAIS Code: Prior Years 559.547 559.547 559.547 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 49.114 45.813 42.318 0.000 42.318 45.406 49.271 46.633 47.319 - - - - - - - - - 49.114 45.813 42.318 0.000 42.318 45.406 49.271 46.633 47.319 - - - - - - - - - 49.114 45.813 42.318 0.000 42.318 45.406 49.271 46.633 47.319 Total 124.641 1,010.062 124.641 1,010.062 124.641 1,010.062 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The FY27 funding increase in the Consolidated Afloat Networks and Enterprise Services (CANES) aligns with funding profile that supports the Navy's priority effort to modernize and protect tactical networks against increased cyber threats and ensure operational readiness from competition to conflict. All procurements align with available ship platform (ship/submarine/shore) modernization windows and the program's capacity to procure and install the product. Sufficient funding ensures that CANES is deployed to the Fleet as quickly as possible to mitigate obsolescence issues, cyber security threats, and keep pace with increased computing and storage requirements for hosted mission applications, and support Department of War (DoW) directives to remove End of Life/Support (EOL/S) Windows Operating Systems software (e.g., operating systems) from the Fleet as quickly as feasible. Obsolete Commercial Off-The-Shelf (COTS) legacy hardware and the termination of cyber security support for legacy versions of COTS software products (e.g., Microsoft, RedHat, Linux) drive increased sustainment costs, reduce operational availability and create critical cyber security vulnerabilities in Navy Tactical Networks. Replacing these older networks and modernizing the tactical environment with CANES is the foundation for all Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) investments to sustain functionality, interoperability, cyber security, supportability, and maintainability. FY27 - CANES funds are for the procurement of (6) Initial CANES Afloat units, (30) Afloat Technical Insertion (TI) units and (1) Ashore TI unit; with integration and associated costs for pre-installation design and the installation of (5) Initial CANES Afloat units, (20) Afloat TI units and (1) Ashore TI unit that were procured in FY26. It is important to note that procurement quantities are the same CANES end item products referenced in CANES, LI 2915. Installation quantities represent sites receiving CANES also referenced in LI 2915. The associated dollars in this exhibit represent the Intel portion of the investment in the CANES system. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 7 of 11 P-1 Line #66 Volume 2 - 597 === page 678 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2925 / CANES Intell Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CANES-Afloat 5G010/5G777 MIP MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CANES-Afloat 5G010/5G777 MIP B Kits Recurring 1.1.1) CANES - Afloat Production Units - MIP NonOrganic (5) 1.1.2) CANES Afloat Technical Insertion - MIP NonOrganic (6) Subtotal: Recurring 184 / 218.490 4 / 2.650 5 / 4.936 6 / 5.466 - / - 6 / 5.466 4 / 3.340 1 / 0.994 178 / 115.213 47 / 30.529 20 / 19.359 27 / 23.004 - / - 27 / 23.004 30 / 24.926 33 / 31.248 / 333.703 - Subtotal: CANES-Afloat 5G010/5G777 MIP Subtotal: Procurement, All Modification Items 362 / 333.703 / 333.703 - / 33.179 - 51 / 33.179 / 33.179 - / 24.295 - 25 / 24.295 / 24.295 - / 28.470 - / - - 33 / 28.470 - / - 33 / 28.470 / 28.470 - / - - - - / 28.470 / 28.470 / 28.266 - 34 / 28.266 / 28.266 - / 32.242 - 34 / 32.242 / 32.242 - - / - 27 / 29.935 / 29.935 - 27 / 29.935 / 29.935 - - / - 30 / 33.638 / 33.638 - 30 / 33.638 / 33.638 - - / - 61 / 92.769 / 92.769 - 61 / 92.769 / 92.769 - 204 / 235.876 453 / 400.621 / 636.497 - 657 / 636.497 / 636.497 - Support (All Modification Items) 2.1) CANES - Afloat Production Support (MIP) 2.2) CANES - Afloat Design Service Agent (MIP) (7) Subtotal: Support - / 16.215 - / 1.920 - / 1.215 - / 1.447 - / 0.000 - / 1.447 - / 1.309 - / 1.249 - / 1.472 - / 1.658 - / 4.259 - / 30.744 - / 18.623 - / 1.234 - / 0.582 - / 0.754 - / 0.000 - / 0.754 - / 0.752 - / 0.733 - / 0.569 - / 0.651 - / 3.559 - / 27.457 - / 34.838 - / 3.154 - / 1.797 - / 2.201 / - - / 2.201 - / 2.061 - / 1.982 - / 2.041 - / 2.309 - / 7.818 - / 58.201 - Installation Modification Item 1 of 1: CANES-Afloat 5G010/5G777 MIP - / 191.006 - / 12.781 - / 19.721 - / 11.647 Subtotal: Installation - / 191.006 - / 12.781 - / 19.721 - / 11.647 - / 0.000 - / 11.647 - / 15.079 - / 15.047 - / 14.657 - / 11.372 - / 24.054 - / 315.364 / - - / 11.647 - / 15.079 - / 15.047 - / 14.657 - / 11.372 - / 24.054 - / 315.364 - Total Total Cost (Procurement + Support + Installation) LI 2925 - CANES Intell Navy 559.547 49.114 45.813 42.318 0.000 UNCLASSIFIED Page 8 of 11 42.318 45.406 49.271 P-1 Line #66 46.633 47.319 124.641 1,010.062 Volume 2 - 598 === page 679 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2925 / CANES Intell Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CANES-Afloat 5G010/5G777 MIP MDAP/MAIS Code: Modification Item 1 of 1: CANES-Afloat 5G010/5G777 MIP Manufacturer Information Manufacturer Name: Multiple Vendors (CANES - Afloat Production Units - MIP) Manufacturer Location: Various (8) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Delivery Dates May 2025 May 2026 May 2027 May 2028 May 2029 Manufacturer Name: Multiple Vendors (CANES Afloat Technical Insertion - MIP) FY 2030 FY 2031 Manufacturer Location: Various (9) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates May 2025 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CANES - Afloat Production Units - MIP Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 180 / 160.895 4 / 2.579 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 184 / 163.474 FY 2025 - / - - / - 4 / 3.843 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 3.843 FY 2026 - / - - / - - / - 5 / 4.840 0 / 0.000 5 / 4.840 - / - - / - - / - - / - 0 / 0.000 5 / 4.840 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 5.202 - / - - / - - / - 0 / 0.000 6 / 5.202 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 4.137 - / - - / - 0 / 0.000 4 / 4.137 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.163 - / - 1 / 0.000 2 / 1.163 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.163 - / - 1 / 0.000 205 / 182.659 Installation Cost Total LI 2925 - CANES Intell Navy 180 / 160.895 4 / 2.579 4 / 3.843 5 / 4.840 0 / 0.000 UNCLASSIFIED Page 9 of 11 5 / 4.840 6 / 5.202 4 / 4.137 P-1 Line #66 Volume 2 - 599 === page 680 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2925 / CANES Intell Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CANES-Afloat 5G010/5G777 MIP MDAP/MAIS Code: Modification Item 1 of 1: CANES-Afloat 5G010/5G777 MIP Installation Information Method of Implementation: [none specified]:: Installation Name: CANES - Afloat Production Units - MIP Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 180 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 2 1 1 1 1 1 - - - - - - - - 204 Out 177 3 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 2 1 1 1 1 - - - - - - - 204 1 Method of Implementation: [none specified]:: Installation Name: CANES Afloat Technical Insertion - MIP Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 133 / 30.111 45 / 10.202 - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 178 / 40.313 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 47 / 15.878 20 / 6.807 - / - - / - - / - - / - 0 / 0.000 20 / 6.807 27 / 9.877 - / - - / - - / - 0 / 0.000 27 / 9.877 - / - - / - 0 / 0.000 30 / 10.910 - / - 0 / 0.000 33 / 13.494 0 / 0.000 27 / 11.372 30 / 13.015 Prior Years / - FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 13.015 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 61 / 11.039 61 / 11.039 91 / 24.054 453 / 132.705 Total 133 / 30.111 47 / 15.878 45 / 10.202 47 / 15.878 20 / 6.807 0 / 0.000 20 / 6.807 0 / 0.000 20 / 6.807 30 / 10.910 27 / 9.877 33 / 13.494 30 / 10.910 27 / 11.372 33 / 13.494 27 / 11.372 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 133 10 10 10 15 13 14 11 9 5 5 5 5 6 7 7 7 7 7 8 8 8 8 8 9 6 7 7 7 91 453 Out 124 9 10 10 10 15 13 14 11 9 5 5 5 5 6 7 7 7 7 7 8 8 8 8 8 9 6 7 7 98 453 Footnotes: (5) The procurement average unit cost fluctuation is due to variance in system configuration requirements for each CANES platform type. - A CANES unit level platform (DDG/CG/LSD) requires a smaller system, supporting fewer users and applications than force level platforms (CVN/LHD/LHA/LCC) with a greater number of users and applications. For example, a CANES DDG design consists of 18 equipment racks and ~400 workstations, while a CANES CVN system consists of 51 equipment racks and ~3000 workstations. The average procurement cost (hardware, software, integration, and engineering support) for a unit level ship ranges from $5.2M to $7.5M, while the average procurement cost for a force level platform ranges from $11.8M to $15.6M, and submarine unit procurement costs range from $2.7M to $4.6M. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 10 of 11 P-1 Line #66 Volume 2 - 600 === page 681 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2925 / CANES Intell ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CANES-Afloat 5G010/5G777 MIP MDAP/MAIS Code: These costs include both the MIP and non-MIP components of the CANES units. - CANES Afloat installations are performed at several fleet concentration areas supported by seven installation Multiple Award Contract (MAC) holders. The Naval Information Warfare Command (NAVWAR) Fleet Readiness Directorate (FRD) Installation Organization (FIO) has ensured sufficient Alteration Installation Teams (AIT) resources are available to meet the FY27 - 31 CANES installation plan. - CANES Afloat production units require an additional 5 months after delivery for integration, assembly and testing prior to installation start. Installations do not begin until 11 months after contract award (6 months production lead time (PLT) + 5 months integration). Total lead time, including admin lead time, is 12 months. (6) The procurement average unit cost fluctuation is due to variance in system configuration requirements for each CANES platform type. - A CANES unit level platform (DDG/CG/LSD) requires a smaller system, supporting fewer users and applications than force level platforms (CVN/LHD/LHA/LCC) with a greater number of users and applications. For example, a CANES DDG design consists of 18 equipment racks and ~400 workstations, while a CANES CVN system consists of 51 equipment racks and ~3000 workstations. The average procurement cost (hardware, software, integration, and engineering support) for a unit level ship ranges from $5.2M to $7.5M, while the average procurement cost for a force level platform ranges from $11.8M to $15.6M, and submarine unit procurement costs range from $2.7M to $4.6M. These costs include both the MIP and non-MIP components of the CANES units. - CANES Afloat installations are performed at several fleet concentration areas supported by seven installation Multiple Award Contract (MAC) holders. The Naval Information Warfare Command (NAVWAR) Fleet Readiness Directorate (FRD) Installation Organization (FIO) has ensured sufficient Alteration Installation Teams (AIT) resources are available to meet the FY27 - 31 CANES installation plan. - CANES Afloat technical insertion units require an additional 5 months after delivery for integration, assembly and testing prior to installation start. Installations do not begin until 11 months after contract award (6 months production lead time (PLT) + 5 months integration). Total lead time, including admin lead time, is 12 months. (7) (8) DSA requirements must be funded one year prior to and completed before installations begin. CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. (9) CANES Full Production Contract has 8 possible vendors on a MAC award: BAE Systems Technology Solutions & Services, DRS Laurel Technologies, Global Technical Systems, L3 Harris, Leidos, Peraton, Serco and VT Milcom. LI 2925 - CANES Intell Navy UNCLASSIFIED Page 11 of 11 P-1 Line #66 Volume 2 - 601 === page 682 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 602 === page 683 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 49.784 32.005 33.395 31.462 0.000 31.462 27.178 32.441 26.140 33.721 - - - - - - - - - - 49.784 32.005 33.395 31.462 0.000 31.462 27.178 32.441 26.140 33.721 - - - - - - - - - - 49.784 32.005 33.395 31.462 0.000 31.462 27.178 32.441 26.140 33.721 Total 234.594 500.720 234.594 500.720 234.594 500.720 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: General Purpose Electrical/Electronic Test Equipment (GPETE) funding is provided to execute a detailed, multi-year sustainment and modernization plan for intermediate and organizational maintenance activities. GPETE is the equipment employed to ensure the accuracy of installation, alignment, and maintenance (preventative and routine) of all Navy weapons systems ashore and afloat. The GPETE procured must meet rigid technical requirements, be cost effective, and satisfy valid deficiencies in authorized allowance. Within the Test, Measurement, and Diagnostic Equipment (TMDE) program, GPETE is classified under 4 functional groups: Fiber Optics (M6000), Signal Generators (M6001), Oscilloscopes & Meters (M6002), and Passive/Ancillary/Mechanical (M6004). The program also breaks out a fifth cost code (M6003) for non-equipment (i.e. labor) tasks including engineering, procurement and integrated logistics support. The Test, Measurement, and Diagnostic Equipment (TMDE) program procures Commercial-off-theShelf (COTS; i.e. non-government manufactured test equipment that is available to the general public) GPETE to address the maintenance requirements across shipboard/shore- based activities and programs. Approximately 90% of the annual test equipment requirements are procured through the DoW Supply System, or MILSTRIP, process. When the program procures through Military Standard Requisitioning and Issue Procedures (MILSTRIP), the Defense Logistics Agency (DLA) or Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS) fills the requisition. The remaining 10% of procurements are Simplified Acquisition Purchase (SAP) contracts or purchase card buys. SAP and purchase card requisitions are utilized only for obsolete test equipment that is no longer available for procurement through MILSTRIP. Any variance in unit costs and quantity across fiscal years is attributable to the diversity and varying complexity of the COTS GPETE to be procured from year to year to address the maintenance requirements across shipboard/shore- based activities and programs. A portion of the cost growth from FY to FY within the cost codes can be attributed to an average industry cost growth. Any average unit cost code growth beyond 2% would be the result of planned procurements of larger quantities of more complex/capable GPETE and/or modernization to more complex/capable GPETE, which tend to be more expensive. The Navy's inventory of GPETE is approaching obsolescence and requires modernization to avoid deterioration in the accuracy of our weapons systems. Many models are no longer in production, so replacement equipment must be purchased from newer model inventory, some of which have a greater unit cost. Failure to maintain accurate test equipment will cause our weapons systems to perform below expectations. The impacts would range from premature mechanical failures due to incorrectly installed mechanical components, to radar and missile operational inaccuracies due to improperly set components. A defined, multi-year modernization plan for test equipment is in place. The Calibration Standards (M6005) funding is provided to execute a detailed, multi-year sustainment and modernization plan for Calibration Standards employed at intermediate, organizational, and depot level maintenance activities. Calibration Standards are equipment employed to ensure the accuracy of test equipment used to install, align, and maintain all Navy weapons systems ashore and afloat. The Navy's inventory of Calibration Standards is approaching obsolescence and require modernization to avoid deterioration in the accuracy and calibration of our weapons systems. Many of the original standards are no longer in production, so replacement standards must be purchased from newer model inventory, some of which have a greater unit cost. A defined, multi-year modernization plan for Calibration Standards is in place. Several multi-year contracts requirements have been initiated and several more packages are in process. Procuring the planned calibration standards supports the performance of every Naval Sea Systems Command (NAVSEA) weapon system including Nuclear Reactor Program maintenance, the Aegis Weapon System afloat and Aegis Ashore Romania/Poland, AN/APX-72 IFF transponder, AN/BRD-7 ECM Intercept System, AN/SQQ-34 ASW Module, and all afloat radio systems. LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 1 of 9 P-1 Line #67 Volume 2 - 603 === page 684 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Gen Purp Elec Test Equip (GPETE) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 49.784 - / 32.005 - / 33.395 - / 31.462 - / 49.784 - / 32.005 - / 33.395 - / 31.462 - / - - / 31.462 / 0.000 - / 31.462 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This funding is required to support General Purpose Electrical/Electronic Test Equipment (GPETE) and Calibration Standards (CALSTD) acquisition and modernization efforts. Modernization and replenishment of critical test equipment ensures measurement requirements are met and ready test equipment is available for fleet maintenance actions of ship/submarine systems. It provides calibration activities with the required capability to support fleet operational readiness needs and meet fleet self-sufficiency goals. All Navy systems and equipment are dependent upon being maintained by properly calibrated test equipment. Sailor safety and shipboard operations are impacted, including certifying reactor, steam plant, and combat systems. GPETE and CALIBRATION STANDARDS are priority readiness focus areas to support Sailor Quality of Service and Ready Ships. LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 2 of 9 P-1 Line #67 Volume 2 - 604 === page 685 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Gen Purp Elec Test Equip (GPETE) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) M6000 FIBER OPTICS and DATA COMMUNICATION 1.1) FIBER OPTICS AND DATA COMM A (1)(†) 27,275.51 Subtotal: 1) M6000 FIBER OPTICS and DATA COMMUNICATION 98 2.673 - 2.673 164 8.533 - 8.533 2,005 7.279 - - 7.279 - - - - 7,496.45 564 4.228 - 4.228 83 1.136 - 1.136 1,336 4.902 - - 4.902 4.802 - - - 4.802 - 1,822 3.710 - 3.710 889 22.787 - 7,630.98 439 3.350 - 3.350 110 1.532 - 1.532 1,334 4.991 - - 4.991 0.690 - - - 0.690 - 928 2.066 - 2.066 721 18.983 - 7,768.25 315 2.447 - - - - 2.447 - - - 130 1.835 - - - - 1.835 - - - 1,219 4.650 - - - - - 4.650 - - - 0.842 - - 0.857 - - - 0.842 - - 0.857 - 1,119 2.539 1,058 2.447 - 2.539 - 750 20.141 - 7,768.25 315 2.447 - 2.447 130 1.835 - 1.835 1,219 4.650 - - 4.650 - - - 0.857 - - - - 0.857 - - - 1,058 2.447 2.447 - - - - 2.447 702 19.226 - - - 702 19.226 - 2) M6001 SIGNAL GENERATORS 2.1) SIGNAL GENERATORS & A (†) ANALYZERS 52,030.49 Subtotal: 2) M6001 SIGNAL GENERATORS - 13,686.75 - 13,927.27 - 14,115.38 - 14,115.38 - 3) M6002 OSCILLSCPS, METERS 3.1) OSCILLSCPS, A (†) METERS&COUNTERS 3,630.42 Subtotal: 3) M6002 OSCILLSCPS, METERS 3,669.18 3,741.38 3,814.60 3,814.60 4) M6003 PROC ENGR AND DOCUMENTATION 4.1) PROC ENG AND DOCUMENTATION A Subtotal: 4) M6003 PROC ENGR AND DOCUMENTATION 5) M6004 PASSIVE ANCILLARY AND MECHANICAL 5.1) PASSIVE ANCILLARY AND MECHANICAL A (†) Subtotal: 5) M6004 PASSIVE ANCILLARY AND MECHANICAL 2,036.22 - 2,226.23 - 2,268.99 - 2,312.85 - 2,312.85 - 6) M6005 CALIBRATION STANDARDS 6.1) M6005 CALIBRATION STANDARDS A (†) 25,632.17 26,328.71 26,854.67 27,387.46 27,387.46 Subtotal: 6) M6005 CALIBRATION STANDARDS - - 22.787 - - 18.983 - - 20.141 - - 19.226 - - - - - 19.226 Total - - 49.784 - - 32.005 - - 33.395 - - 31.462 - - - - - 31.462 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Funding supports Fleet requirements for fiber optic repair capability to mitigate increased maintenance delays, increased downtime, and forced Sailor work-around and increased operational risk, with negative impact to ships readiness. LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 3 of 9 P-1 Line #67 Volume 2 - 605 === page 686 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Contractor and Location Method/Type or Funding Vehicle 2023 NSWC/CHINA LAKE / CHINA LAKE 2024 Aggregated Items: Gen Purp Elec Test Equip (GPETE) Location of PCO Award Date Date of First Delivery WR CHINA LAKE Nov 2022 Mar 2023 44 51,727.27 Y NSWC/CHINA LAKE / CHINA LAKE WR CHINA LAKE Oct 2023 Feb 2024 54 7,351.85 Y 2025 NSWC/CHINA LAKE / CHINA LAKE WR CHINA LAKE Oct 2024 Feb 2025 564 7,496.45 Y 2026 NSWC/CHINA LAKE / CHINA LAKE WR CHINA LAKE Oct 2025 Feb 2026 439 7,630.98 Y 2027 NSWC/CHINA LAKE / CHINA LAKE WR CHINA LAKE Oct 2026 Feb 2027 315 7,768.25 N 2.1) SIGNAL GENERATORS & ANALYZERS 2023 NSWC / CHINA LAKE WR CHINA LAKE Nov 2022 Mar 2023 54 13,650.00 Y 2.1) SIGNAL GENERATORS & ANALYZERS 2024 NSWC / CHINA LAKE WR CHINA LAKE Oct 2023 Feb 2024 110 13,518.18 Y 2.1) SIGNAL GENERATORS & ANALYZERS 2025 NSWC / CHINA LAKE WR CHINA LAKE Oct 2024 Feb 2025 83 13,686.75 Y 2.1) SIGNAL GENERATORS & ANALYZERS 2026 NSWC / CHINA LAKE WR CHINA LAKE Oct 2025 Feb 2026 110 13,927.27 Y 2.1) SIGNAL GENERATORS & ANALYZERS 2027 NSWC / CHINA LAKE WR CHINA LAKE Oct 2026 Oct 2026 130 14,115.38 N 3.1) OSCILLSCPS, METERS&COUNTERS 2023 NSWC / CHINA LAKE WR CHINA LAKE Nov 2022 Mar 2023 652 3,695.87 Y 3.1) OSCILLSCPS, METERS&COUNTERS 2024 NSWC / CHINA LAKE WR CHINA LAKE Oct 2023 Feb 2024 1,353 3,598.67 Y 3.1) OSCILLSCPS, METERS&COUNTERS 2025 NSWC / CHINA LAKE WR CHINA LAKE Oct 2024 Feb 2025 1,336 3,669.18 Y 3.1) OSCILLSCPS, METERS&COUNTERS 2026 NSWC / CHINA LAKE WR CHINA LAKE Oct 2025 Feb 2026 1,334 3,741.38 Y 3.1) OSCILLSCPS, METERS&COUNTERS 2027 NSWC / CHINA LAKE WR CHINA LAKE Oct 2026 Oct 2026 1,219 3,814.60 N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) FY Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) M6000 FIBER OPTICS and DATA COMMUNICATION 1.1) FIBER OPTICS AND DATA COMM (1) 1.1) FIBER OPTICS AND DATA COMM (1) 1.1) FIBER OPTICS AND DATA COMM (1) 1.1) FIBER OPTICS AND DATA COMM (1) 1.1) FIBER OPTICS AND DATA COMM (1) 2) M6001 SIGNAL GENERATORS 3) M6002 OSCILLSCPS, METERS 5) M6004 PASSIVE ANCILLARY AND MECHANICAL 5.1) PASSIVE ANCILLARY AND MECHANICAL 2023 NSWC / CHINA LAKE WR CHINA LAKE Nov 2022 Mar 2023 686 1,790.82 Y 5.1) PASSIVE ANCILLARY AND MECHANICAL 2024 NSWC / CHINA LAKE WR CHINA LAKE Oct 2023 Feb 2024 1,136 2,183.98 Y LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 4 of 9 P-1 Line #67 Volume 2 - 606 === page 687 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Aggregated Items: Gen Purp Elec Test Equip (GPETE) FY Contractor and Location Method/Type or Funding Vehicle 5.1) PASSIVE ANCILLARY AND MECHANICAL 2025 NSWC / CHINA LAKE WR CHINA LAKE Oct 2024 Feb 2025 928 2,226.23 Y 5.1) PASSIVE ANCILLARY AND MECHANICAL 2026 NSWC / CHINA LAKE WR CHINA LAKE Oct 2025 Feb 2026 1,119 2,268.99 Y 5.1) PASSIVE ANCILLARY AND MECHANICAL 2027 NSWC / CHINA LAKE WR CHINA LAKE Oct 2026 Oct 2026 1,058 2,312.85 N 2023 NSWC/CORONA / CORONA WR CORONA Nov 2022 Mar 2023 270 25,326.53 Y 2024 NSWC/CORONA / CORONA WR CORONA Oct 2023 Feb 2024 619 25,765.60 Y 2025 NSWC/CORONA / CORONA WR CORONA Oct 2024 Feb 2025 721 26,328.71 Y 2026 NSWC/CORONA / CORONA WR CORONA Oct 2025 Feb 2026 750 26,854.67 Y 2027 NSWC/CORONA / CORONA WR CORONA Oct 2026 Feb 2027 702 27,387.46 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 6) M6005 CALIBRATION STANDARDS 6.1) M6005 CALIBRATION (†) STANDARDS 6.1) M6005 CALIBRATION (†) STANDARDS 6.1) M6005 CALIBRATION (†) STANDARDS 6.1) M6005 CALIBRATION (†) STANDARDS 6.1) M6005 CALIBRATION (†) STANDARDS (†) indicates the presence of a P-21 LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 5 of 9 P-1 Line #67 Volume 2 - 607 === page 688 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Gen Purp Elec Test Equip (GPETE) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 6) M6005 CALIBRATION STANDARDS 6.1) M6005 CALIBRATION STANDARDS 10 2023 NAVY 270 0 270 10 2024 NAVY 619 0 619 A - - - - 270 0 10 2025 NAVY 721 0 721 721 10 2026 NAVY 750 0 750 750 10 2027 NAVY 702 0 702 A - - - - 619 0 702 O C T N O V LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #67 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 608 === page 689 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Gen Purp Elec Test Equip (GPETE) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 6) M6005 CALIBRATION STANDARDS 6.1) M6005 CALIBRATION STANDARDS 10 2023 NAVY 270 270 0 10 2024 NAVY 619 619 0 10 2025 NAVY 721 0 721 10 2026 NAVY 750 0 750 10 2027 NAVY 702 0 702 0 0 A - - - - 721 0 A - - - - 750 0 702 O C T N O V LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #67 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 609 === page 690 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Items (Units in Each) O O C M F R # FY SERVICE PROC QTY Aggregated Items: Gen Purp Elec Test Equip (GPETE) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 6) M6005 CALIBRATION STANDARDS 6.1) M6005 CALIBRATION STANDARDS 10 2023 NAVY 270 270 0 0 10 2024 NAVY 619 619 0 0 10 2025 NAVY 721 721 0 0 10 2026 NAVY 750 750 0 10 2027 NAVY 702 0 702 0 A O C T N O V LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy D E C J A N 702 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #67 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 610 === page 691 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2940 / Gen Purp Elec Test Equip (GPETE) Production Rates (Each / Year) MFR Ref # Aggregated Items: Gen Purp Elec Test Equip (GPETE) Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 1 NSWC/CORONA - CORONA MAX For 2027 TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 4 Total After Oct 1 ALT Prior to Oct 1 4 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2940 - Gen Purp Elec Test Equip (GPETE) Navy UNCLASSIFIED Page 9 of 9 P-1 Line #67 Volume 2 - 611 0 === page 692 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 612 === page 693 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Program Elements for Code B Items: 0604280N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 61.607 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 - - - - - - - - - 61.607 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 - - - - - - - - - 61.607 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 To FY 2031 Complete 11.515 Continuing - Continuing - 11.515 Continuing - Total - Continuing - - 11.515 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.737 - 5.483 - 5.483 0.335 - - - - 8.555 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Network Tactical Common Data Link (NTCDL) provides the ability to transmit/receive real-time intelligence, surveillance, and reconnaissance (ISR) data simultaneously from multiple sources (air, surface, subsurface, and manportable) and exchange command and control information (voice, data, imagery, and full-motion video) across dissimilar joint, service, coalition, and civil networks. NTCDL provides warfighters the capability to support multiple, simultaneous, networked operations with in-service Common Data Link (CDL) equipped aircraft (e.g., MH- 60R) in addition to next-generation manned and unmanned platforms. NTCDL benefits the Fleet by providing a horizon extension for line-of-sight systems for use in time-critical strike missions. LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 1 of 7 P-1 Line #68 Volume 2 - 613 === page 694 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Program Elements for Code B Items: 0604280N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Network Tactical Common Data Link (CDL) - / 27.150 P-3a 1 / Network Tactical Common Data Link (NTCDL) (TBD) - / 34.457 P-40 Total Gross/Weapon System Cost - / 61.607 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - / 24.361 - / 24.361 - / - - / 13.205 - / 13.205 - / - - / 5.822 - / 5.822 - / - - - / 0.000 - - / 0.000 - / / 5.822 / 5.822 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Network Tactical Common Data Link (CDL) P-3a 1 / Network Tactical Common Data Link (NTCDL) (TBD) - - / 11.111 / - - / 11.088 / - - / 11.292 / - - / 11.515 / - Continuing - / - Continuing - / - P-40 Total Gross/Weapon System Cost - / 11.111 - / 11.088 - / 11.292 - / 11.515 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports phase one installation of (1) NTCDL system. FY27 funds also supports associated DSA for shipALT installation design requirements and engineering change order/non-recurring engineering retrofit required to meet military specifications. LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 2 of 7 P-1 Line #68 Volume 2 - 614 === page 695 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Network Tactical Common Data Link (CDL) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 1) Network Tactical Common Data Link (CDL) 1.1) Consolidated Prior Year Requirements A (1) 2,715.000 10 27.150 - - - - - - - - - - - - - - - Subtotal: 1) Network Tactical Common Data Link (CDL) - - 27.150 - - - - - - - - - - - - - - - Total - - 27.150 - - - - - - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Consolidated prior years for LINK-16 Antennas ($.290M), CDLS Tech Refresh Procurement ($12.443M), CDLS Tech Refresh Support (DSA, Production Support, & NRE) ($5.229M), and associated CDLS Tech Refresh Installations ($9.188M). LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 3 of 7 P-1 Line #68 Volume 2 - 615 === page 696 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Network Tactical Common Data Link (NTCDL) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 34.457 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 - - - - - - - - - 34.457 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 - - - - - - - - - 34.457 24.361 13.205 5.822 0.000 5.822 11.111 11.088 11.292 To FY 2031 Complete 11.515 Continuing - Continuing - 11.515 Continuing - Total - Continuing - - 11.515 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Network Tactical Common Data Link (NTCDL) provides the ability to transmit/receive real-time intelligence, surveillance, and reconnaissance (ISR) data simultaneously from multiple sources (air, surface, subsurface, and manportable) and exchange command and control information (voice, data, imagery, and full-motion video) across dissimilar joint, service, coalition, and civil networks. NTCDL provides warfighters the capability to support multiple, simultaneous, networked operations with in-service Common Data Link (CDL) equipped aircraft (e.g., MH- 60R) in addition to next-generation manned and unmanned platforms. NTCDL benefits the Fleet by providing a horizon extension for line-of-sight systems for use in time-critical strike missions. LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 4 of 7 P-1 Line #68 Volume 2 - 616 === page 697 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Network Tactical Common Data Link (NTCDL) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Network Tactical Common Data Link (NTCDL) B Kits Recurring 1.1.1) NTCDL System Procurement - NonOrganic 1.1.2) NTCDL Engineering Change Order - Organic 2 / 19.844 (2) 1.1.3) NTCDL Non Recurring Equipment - Organic 1.1.4) NTCDL Tech Refresh - NonOrganic - / - - / 3.710 - / - - / - - / 3.806 - / - - / - / - - / - 1 / 10.499 - (3) Subtotal: Recurring Subtotal: Network Tactical Common Data Link (NTCDL) Subtotal: Procurement, All Modification Items / 27.360 - 1 / 13.875 2 / 27.360 / 27.360 - / 13.875 - / 13.875 / - - / - / 1.874 - / - - / - - / - - / - - / - - / - - / - / - - / - / - Continuing Continuing / 1.874 - / - - / 0.559 - / - - / 0.560 Continuing Continuing - / - - / - - / 2.245 - / - - / 2.336 Continuing Continuing - / - - / 10.499 - / 1.874 - / - - / 1.874 1 / 10.499 - / 1.874 - / - - / 1.874 / 10.499 - / 1.874 - / - - / 1.874 - 1 / 13.875 - - - - 1 / 10.557 - / - / 10.557 - / 2.804 1 / 10.557 - / 2.804 / 10.557 - / 2.804 - - - 1 / 10.827 - / - - / - 3 / 31.883 / 10.827 - / 2.896 Continuing Continuing 1 / 10.827 - / 2.896 Continuing Continuing / 10.827 - / 2.896 Continuing Continuing - - - Support (All Modification Items) 2.1) NTCDL Integration Support - / 0.480 - / 0.236 - / 0.131 / - - / - / - - / 0.144 - / 0.701 / - - / 0.805 Continuing Continuing 2.2) NTCDL Production Support - / 1.550 - / 0.832 - / 0.600 - - / 0.109 - / - - - / 0.109 - / 0.240 - / 0.102 - / 0.160 - / 0.166 Continuing Continuing 2.3) NTCDL DSA - / 1.005 - / 1.092 - / 1.975 - / 0.479 - / - - / 0.479 - / 0.170 - / 1.457 - / 0.305 - / 1.448 Continuing Continuing Subtotal: Support - / 3.035 - / 2.160 - / 2.706 - / 0.588 - / - - / 0.588 - / 0.554 - / 2.260 - / 0.465 - / 2.419 Continuing Continuing Modification Item 1 of 1: Network Tactical Common Data Link (NTCDL) - / 4.062 - / 8.326 - / 0.000 - / 3.360 / 0.000 - / 3.360 - / 0.000 - / 6.024 - / 0.000 - / 6.200 - / 0.000 - / 27.972 Subtotal: Installation - / 4.062 - / 8.326 / - - / 3.360 / - - / 3.360 / - - / 6.024 / - - / 6.200 - / 0.000 - / 27.972 11.515 Continuing Installation - - - - Total Total Cost (Procurement + Support + Installation) 34.457 LI 2950 - Network Tactical Common Data Link (CDL) Navy 24.361 13.205 5.822 0.000 UNCLASSIFIED Page 5 of 7 5.822 11.111 11.088 P-1 Line #68 11.292 Continuing Volume 2 - 617 === page 698 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Network Tactical Common Data Link (NTCDL) MDAP/MAIS Code: Modification Item 1 of 1: Network Tactical Common Data Link (NTCDL) Manufacturer Information Manufacturer Name: BAE Systems LP Manufacturer Location: Wayne, NJ Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 11 Dates FY 2025 Contract Dates Oct 2024 Delivery Dates Sep 2025 FY 2026 FY 2027 Manufacturer Name: BAE Systems LP FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Wayne, NJ Administrative Leadtime (in Months): 6 Dates FY 2028 Production Leadtime (in Months): 12 FY 2025 FY 2026 Contract Dates Apr 2026 Delivery Dates Apr 2027 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: NTCDL System Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 4.062 1 / 4.163 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 8.225 FY 2025 - / - 1 / 4.163 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 4.163 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 4.062 2 / 8.326 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 6 of 7 P-1 Line #68 4 / 12.388 Volume 2 - 618 === page 699 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2950 / Network Tactical Common Data Link (CDL) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Network Tactical Common Data Link (NTCDL) MDAP/MAIS Code: Modification Item 1 of 1: Network Tactical Common Data Link (NTCDL) Installation Information Method of Implementation: [none specified]:: Installation Name: NTCDL System Procurement Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - 3 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 - 2 Method of Implementation: [none specified]:: Installation Name: NTCDL Tech Refresh Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 1 / 3.360 0 / 0.000 1 / 3.360 - / - - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 6.024 - / - - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.200 0 / 0.000 1 / 6.200 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 1 / 3.360 1 / 3.360 - / - 1 / 6.024 - / - 1 / 6.200 Installation Cost 0 / 0.000 - 1 / 3.360 / - - / - 1 / 6.024 / - - 0 / 0.000 / - 3 / 15.584 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - 1 - - - - - - - 1 - - - - - - - 1 - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - 3 - 1 - 1 - 1 Footnotes: (2) NTCDL Engineering Change Order (ECO): FY27 ECO funding required to procure fiber optic cables and engineering design cost associated with incorporating fiber optic cables into applicable drawings to meet military specification. In addition, these changes will require updates to part numbers and technical publications (maintenance, logistics, and training materials) to meet carrier-specific specifications. (3) NTCDL Tech Refresh: For FY26 and beyond, a tech refresh is planned, and procurement will transition to a smaller-scale system via a follow-on production contract. LI 2950 - Network Tactical Common Data Link (CDL) Navy UNCLASSIFIED Page 7 of 7 P-1 Line #68 Volume 2 - 619 === page 700 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 620 === page 701 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2960 / Integ Combat System Test Facility Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 86.687 6.709 11.493 6.454 0.000 6.454 6.772 6.480 6.623 6.750 - - - - - - - - - - - - 86.687 6.709 11.493 6.454 0.000 6.454 6.772 6.480 6.623 6.750 - Total 137.968 137.968 - - - - - - - - - - - 86.687 6.709 11.493 6.454 0.000 6.454 6.772 6.480 6.623 6.750 - 137.968 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.333 - 0.297 - 0.297 0.445 0.393 - - - 1.468 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The 2960 Line Item (LI) is shared between the Strike Force Interoperability (SFI) and Shipboard Electronic Systems Evaluation Facilities (SESEF) programs. This program supports various Navy Land Based Test Sites (LBTS) required to support integration and interoperability testing. Sites include, but are not limited to, Naval Surface Warfare Center (NSWC) Dahlgren, Surface Combat System Center (SCSC) Wallops Island, Naval Information Warfare Center Pacific, and NSWC Dam Neck. This funding also supports the Shipboard Electronic Systems Evaluation Facilities (SESEF) Program for the procurement, installation for upgrades and modernization to provide electromagnetic system test and evaluation services to afloat and shore commands for development of new and upgraded systems, to validate system performance following new construction and overhaul, and to provide real-time assessment of material readiness in an operational environment. The United States Navy has a requirement to fully test and certify computer programs for maturity, Interoperability and Integration (I&I) prior to delivery to the Fleet. Commander, U.S. Fleet Forces Command (CUSFFC) provided specific direction to develop a unified modernization process and certify all combat system baselines for integration and interoperability as an integral step in the Chief of Naval Operations (CNO) Optimized Fleet Response Plan (OFRP). Various Navy facilities, serving as LBTS, conduct the required testing in support of CVN, DDG, LCS, DDG 1000, CG, LHD, LHA, LPD 17 and LSD class ships. These sites also comprise the Navy's Distributed Integration & Interoperability Assessment Capability (DIIAC) (supported through the use of JMETC network) alliance, which performs Interoperability Assessment and Systems Engineering Events (SEEs) for deploying Strike Groups. These facilities also provide combat system in-service support to respond to emergent fleet problems. This capability tests and certifies new combat system baselines in a lab-based environment, which has significantly reduced the cost of corrective action and shifted the burden of problem discovery away from the operator at sea. It also provides support to the acquisition community to conduct interoperability (shift to the left) testing earlier in the acquisition cycle. As existing systems experience parts obsolescence issues and tech refresh updates, the LBTS must procure and install existing test beds to accurately replicate the Command, Control, Communication, Computer, Combat System and Intelligence (C5I) configuration that is designed for the fleet. In addition, new combat systems architectures are under development for new ship classes, as well as new Infrastructure as a Service (IaaS) variants of legacy suites. Procurement of production representative systems of these IaaS combat systems being delivered to operational fleet units is critical to ensure that testing and subsequent certification of both current and newly installed combat systems is in accordance with NAVSEAINST 9410.2 Naval Warfare Systems Certification Policy (NWSCP) and the Optimized Fleet Response Plan (O-FRP). The basic procurement outlined herein is directed at expanding various facilities' capability to support Interoperability Integration and Stressful Endurance testing. Procurement requirements are directly tied to the interoperability testing schedule and establish independence between test beds allowing for parallel certification efforts. Procurements are required to build the necessary test beds and for laboratory support equipment. Transition to use of Virtual Test Environments will improve lab reliability while reducing lab support costs. This budget procures lab support equipment that ensures various facilities are able to support the new tactical subsystems, and new communications paths impacting interoperability, that use Commercial Off-the-Shelf (COTS) equipment. In addition, the basic program provides for equipment/upgrades for the Navy's Distributed Integration & Interoperability Assessment Capability (DIIAC) needed to conduct interoperability assessment testing. The DIIAC consists of 23 land-based sites networked to certify computer programs prior to their delivery to the fleet and provides support LI 2960 - Integ Combat System Test Facility Navy UNCLASSIFIED Page 1 of 4 P-1 Line #69 Volume 2 - 621 === page 702 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2960 / Integ Combat System Test Facility Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A to the acquisition community to conduct interoperability and integration (shift to the left) testing earlier in the acquisition cycle. Interoperability Assessment is required for all deploying strike groups per the Joint Fleet Instruction. The Shipboard Electronic Systems Evaluation Facilities (SESEF) are Navy owned and operated test sites located near heavy fleet concentrated areas and strategic Forward Deployed Naval Forces Sites. The SESEF Program mission is to provide electromagnetic systems test and evaluation services to afloat and shore commands for upgraded systems, to validate system performance following new construction and overhaul/availability, and to provide real-time assessment of material readiness in an operational environment. [P40A / M8400 - SESEF Electronic Equipment]: The Shipboard Electronic Systems Evaluation Facilities (SESEF) are Navy owned and operated test sites located near heavy fleet concentrated areas and strategic Forward Deployed Naval Forces Sites. The SESEF Program mission is to provide electromagnetic systems test and evaluation services to afloat and shore commands for upgraded systems, to validate system performance following new construction and overhaul/availability, and to provide real-time assessment of material readiness in an operational environment. Also provided are: system modernization and integration, system and equipment component procurement and software (S/W) upgrades for test systems to include, but not limited to, Tactical Control and Navigation (TACAN), Antenna Radiation Pattern (ARP) systems, Identification Friend or Foe (IFF), Direction Finder (DF)/Radio Direction Finder (RDF), LINK 11/16/22, Electronic Warfare/Electronic Attack (EW/EA) and HF/VHF/UHF communication systems, including secure voice. SESEFs are used to effectively conduct TACAN certifications, AN/SLQ-32 Electronic Warfare (EW) Planned Maintenance System (PMS) requirements checks, Ship Signals Exploitation Equipment (SSEE) calibrations and PMS checks, and to detect and to isolate shipboard system deficiencies leading to maintenance action to increase ship material readiness at the completion of construction, delivery availabilities, during routine ship operations, and prior to deployment. FY26 increase is to support upgrade of test ranges to meet AN/SLQ-32 (V)6 & (V)7 testing requirements and upgrades to various data links to ensure systems are fully mission capable for Fleet operations. This funding is associated with initial spares funding line JC2M8 Integrated Combat System Test Facility (J2960). [P40A / M8500 - Interoperability Assessment Equipment]: M8500 - Interoperability assessment equipment known as Distributed Integration & Interoperability Assessment Capability (DIIAC) procures upgrades to support the 23 sites that comprise the Navy's DIIAC sites. Procures hardware that provides the DIIAC Operations Center (DOC) the ability to support monitoring and execution of events providing data collection and distribution. Funds are also allocated for site upgrades to meet current standards and allow scalability for DIIAC requirements; and, in addition, to enable the DIIAC to maintain efficiency and product improvement to interface with other Joint communities using Joint Mission Environment Test Community (JMETC) network. Focused on the force-level impact of new systems and platforms under development, the DIIAC supports testing that ensures Commander, Naval Sea System Command/Program Executive Offices (NAVSEA/PEOs) are delivering mature and interoperable warfare systems at the Platform and Strike Group levels, with NAVSEA providing Strike Force Interoperability Certification and Assessments. This is the only such testing of combat systems and Command, Control, Communication, Computer, Combat System and Intelligence (C5I) configuration items prior to shipboard delivery for operational use. Funding decrease from FY25-FY26 noted in Footnotes. LI 2960 - Integ Combat System Test Facility Navy UNCLASSIFIED Page 2 of 4 P-1 Line #69 Volume 2 - 622 === page 703 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2960 / Integ Combat System Test Facility Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a ICSTF Program - / 86.687 - / 6.709 - / 11.493 - / 6.454 P-40 Total Gross/Weapon System Cost - / 86.687 - / 6.709 - / 11.493 - / 6.454 - / - - / 6.454 / 0.000 - / 6.454 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Decrease to control from FY26 $7.852M to FY27 $3.523 is due to the completion of procurements of the equipment associated with the upgrades of test ranges to meet AN/ SLQ-32 (V)6 & (V)7 testing requirements and upgrades to various data links to ensure systems are fully mission capable for Fleet operations in FY26. FY27 funds include SESEF Program mission requirements to provide electromagnetic systems test and evaluation upgrades and modernization of afloat and shore commands to validate system performance following new construction and overhaul/availability and provides real-time assessment of material readiness in an operational environment. Funding for procurements and installations for upgrades and modernization of the eight operational sites and mobile trailers across the AORs to support the Shipboard Electronic Systems Evaluation Facility (SESEF). Increase of $4.78M from FY25 to FY26 is for procurement of testing equipment for the AN/SLQ-32 (V)6 & (V)7 upgrades at all fixed and mobile sites to ensure systems are fully mission capable for Fleet operations. LI 2960 - Integ Combat System Test Facility Navy UNCLASSIFIED Page 3 of 4 P-1 Line #69 Volume 2 - 623 === page 704 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2960 / Integ Combat System Test Facility Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Qty ($) (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: ICSTF Program FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) M8400 - SESEF Electronic Equipment 1.1) SESEF Electronic Equipment A - - 47.903 - - 2.734 - - 7.852 - - 3.259 - - - - - 3.259 - - 47.903 - - 2.734 - - 7.852 - - 3.259 - - - - - 3.259 - - 38.784 - - 3.975 - - 3.641 - - 3.195 - - - - - 3.195 Subtotal: 2) M8500 - Interoperability Assessment Equipment - - 38.784 - - 3.975 - - 3.641 - - 3.195 - - - - - 3.195 Total - - 86.687 - - 6.709 - - 11.493 - - 6.454 - - - - - 6.454 Subtotal: 1) M8400 - SESEF Electronic Equipment 2) M8500 - Interoperability Assessment Equipment 2.1) Interoperability Assessment Equipment A (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) M8500 - Interoperability Assessment Equipment: Reduction in resources will result in less labor for engineering change proposals necessary for capability infrastructure updates (electronic warfare, SPY6), fewer test nodes available to support land-based test verification and validation events, and the elimination of additional labs that can be brought into the Strike Force Interoperability (SFI) land-based test infrastructure (NIWC CTB/BTS, SAIL) LI 2960 - Integ Combat System Test Facility Navy UNCLASSIFIED Page 4 of 4 P-1 Line #69 Volume 2 - 624 === page 705 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2970 / EMI Control Instrumentation Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 70.445 4.081 3.687 3.435 0.000 3.435 3.619 3.678 3.753 3.830 - 96.528 Total - - - - - - - - - - - - 70.445 4.081 3.687 3.435 0.000 3.435 3.619 3.678 3.753 3.830 - 96.528 - - - - - - - - - - - - 70.445 4.081 3.687 3.435 0.000 3.435 3.619 3.678 3.753 3.830 - 96.528 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The EMI Control Instrumentation Program is supported by OPNAV N2N6, OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. The EMI Control Instrumentation Program provides Cradle to Grave Systems Engineering for Mission Assurance by implementing Electromagnetic Compatibility (EMC) hardware solutions, Spectrum Management (SM) software solutions, and by procuring specialized test equipment used in the characterization/ quantification of EMI problems aboard US Navy platforms. This ensures equipment, systems, and platforms meet their Operational Mission Requirements and goals within their intended operational Electromagnetic (EM) environment. MA004 - EMI (HARDWARE) FIXES: Procurement and installation of Electromagnetic Interference (EMI) Hardware Solutions (i.e. Fixes) will achieve Electromagnetic Compatibility (EMC) among and between shipboard electronic/electric systems and/or equipment. This will be accomplished by determining the optimal EMI fix hardware, evaluating the effectiveness of the EMI solution, then procuring and installing the required hardware for mitigation verification. The fixes may include various types of radio frequency (RF) filters, limiters, Transient Protection Devices (TPD), blankers, radar absorbing material (RAM) and shielding methods. MA004 - EMI (Hardware) Fixes is supported by OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. MA104 - EMI (SOFTWARE) FIXES: Procurement and installation of EMI Software Fixes for platform/strike group/Area of Operation. These specific spectrum procedures (software application capabilities) and frequency management techniques (software modules) will be used to eliminate and reduce EMI when hardware solutions are unacceptable. Funds will also be used to support procurement of models and other capabilities, including ILS for software tools/utilities/applications that correct/mitigate operational EMI. MA104 - EMI (Software) Fixes are supported by OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. MA204 - EMI CONTROL INSTRUMENTATION: EMI Control Instrumentation will procure specialized test equipment used in the characterization and quantification of EMI problems aboard US Navy platforms. Instrumentation will be procured for use in identifying the sources of EMI and determining the extent of EMI so that effective corrective measures can be applied. The instrumentation procured will include automated and special EMI test equipment (e.g., for spectrum analysis, mapping field intensities, etc.). EMI Control Instrumentation can include both hardware and software products that will enhance or streamline data collection efforts, including the ability to provide remote access capability. MA204 - EMI CONTROL INSTRUMENTATION are supported by OPNAV N2N6. LI 2970 - EMI Control Instrumentation Navy UNCLASSIFIED Page 1 of 3 P-1 Line #70 Volume 2 - 625 === page 706 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2970 / EMI Control Instrumentation Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a EMI Control Instrumentation - / 70.445 - / 4.081 - / 3.687 - / 3.435 P-40 Total Gross/Weapon System Cost - / 70.445 - / 4.081 - / 3.687 - / 3.435 - / - - / 3.435 / 0.000 - / 3.435 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding decrease of $394K from FY 2025 to FY 2026 applied to EMI Hardware (MA004), Software Fixes (MA104) procurements and EMI Control Instrumentation. MA004 (EMI HDW Fixes) OPN Funds are used to procure and install (P/I) EMI Fixes on deploying ships and submarines. The number of EMI Fixes procured (MA004 Hardware Fixes) are dependent on the number of ships/submarines in the Fleet and when they deploy. MA104 (EMI SFW Fixes) procures and installs SFW Fixes to mitigate electromagnetic interference (EMI). This effort retains responsibility for the procurement of models and frequency management techniques that are encompassed by other Navy tools (e.g., Real-Time Spectrum Operations). MA204 (EMI Control Instrumentation) procures and installs specialized test equipment for HW and SW products in collecting data to provide corrective measures. LI 2970 - EMI Control Instrumentation Navy UNCLASSIFIED Page 2 of 3 P-1 Line #70 Volume 2 - 626 === page 707 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2970 / EMI Control Instrumentation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: EMI Control Instrumentation FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) MA004 EMI (HARDWARE) FIXES 1.1) MA004 EMI (HARDWARE) FIXES - N96 A 1.2) MA004 EMI (HARDWARE) FIXES - N95 A 1.3) MA004 EMI (HARDWARE) FIXES - N97 A 1.4) MA004 EMI (HARDWARE) FIXES N98 A - - 12.996 - - 1.087 - - 0.976 - - 0.922 - - - - - 0.922 - - 9.188 - - 0.812 - - 0.723 - - 0.688 - - - - - 0.688 - - 8.705 - - 0.431 - - 0.383 - - 0.364 - - - - - 0.364 - - 10.075 - - 0.773 - - 0.697 - - 0.660 - - - - - 0.660 - - 40.964 - - 3.103 - - 2.779 - - 2.634 - - - - - 2.634 - - 4.848 - - 0.091 - - 0.089 - - 0.072 - - - - - 0.072 - - 7.128 - - 0.122 - - 0.122 - - 0.098 - - - - - 0.098 - - 5.049 - - 0.048 - - 0.048 - - 0.038 - - - - - 0.038 - - 6.789 - - 0.090 - - 0.086 - - 0.068 - - - - - 0.068 - - 23.814 - - 0.351 - - 0.345 - - 0.276 - - - - - 0.276 - - 5.667 - - 0.627 - - 0.563 - - 0.525 - - - - - 0.525 Subtotal: 3) MA204 EMI CONTROL INSTRUMENTATION - - 5.667 - - 0.627 - - 0.563 - - 0.525 - - - - - 0.525 Total - - 70.445 - - 4.081 - - 3.687 - - 3.435 - - - - - 3.435 Subtotal: 1) MA004 EMI (HARDWARE) FIXES 2) MA104 EMI (SOFTWARE) FIXES 2.1) MA104 EMI (SOFTWARE) FIXES - N95 A 2.2) MA104 EMI (SOFTWARE) FIXES - N96 A 2.3) MA104 EMI (SOFTWARE) FIXES - N97 A 2.4) MA104 EMI (SOFTWARE) FIXES - N98 A Subtotal: 2) MA104 EMI (SOFTWARE) FIXES 3) MA204 EMI CONTROL INSTRUMENTATION 3.1) MA204 EMI CONTROL INSTRUMENTATION - N2N6 A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 2970 - EMI Control Instrumentation Navy UNCLASSIFIED Page 3 of 3 P-1 Line #70 Volume 2 - 627 === page 708 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 628 === page 709 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 290.485 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 290.485 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 290.485 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 262.890 262.890 262.890 249.656 249.656 249.656 338.946 - 0.000 - 338.946 - 0.000 - 338.946 0.000 338.946 338.946 338.946 299.163 299.163 299.163 295.691 295.691 295.691 241.739 241.739 241.739 To FY 2031 Complete 237.608 16,419.812 237.608 18,635.990 16,419.812 237.608 Total - 18,635.990 16,419.812 18,635.990 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.304 - 1.878 - 1.878 3.433 2.680 5.417 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - 5.026 Continuing - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [P40A / DC020 DUAL BAND RADAR (DBR)]: Funding is required to maintain the In-Service Engineering Agent (ISEA) and Original Equipment Manufacturer (OEM) production services and support for Configuration Management. Funding also implements the DBR Life Cycle Sustainment Plan (LCSP) and infrastructure, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan, associated hardware and software obsolescence mod kits, procurement of Engineering Change Proposals (ECPs), associated logistics products and on-board repair parts allowance requirements to enable system operation. Additionally, funding is required for a technology refresh for the DBR Signal Data Processors (SDPs) for CVN 78 and DDG 1000 Class ships. The current version of the IBM Advanced Interactive eXecutive (AIX) operating system (OS) that is running on the IBM P6 DBR SDPs reached the end of service in FY22 and the risk for DBR to satisfy Cyber Authority to Operate (ATO) requirements will increase. The next version of IBM AIX OS will not run on the IBM P6. Hardware spares for DBR SDP P6 computers are no longer available from IBM or certified IBM vendors. Production Support is also required to assist with DBR Combat System Integration and Technical Documentation. Funding also supports CVN 78 and DDG 1000 Class Operational Testing (OT) events. Additional limitations will be identified during DDG 1001 Shipboard Activation, as well as the CVN 78 and DDG 1000 deployments. The OEM and Government Technical Team have documented the critical radar issues that require correction via ECPs. Funding for these ECP efforts is required due to the engineering and technical complexity of the change proposals needed to satisfy combat system qualification requirements. The four DBR systems on CVN 78 and the three DDG 1000 class ships will be the full extent of the population. The small inventory of DBR based radars are also out of production and therefore, require increasing investments in obsolescence engineering, OEM repairs, and continuous onboard OEM technical support in order to maintain an acceptable level of operational availability. The DBR program received additional sustainment resources in FY26 to maintain the systems until the Navy decides to replace them with a more sustainable alternative. DBR Special Test Equipment and Infrastructure funding is needed for: (1) test equipment and support for a repair depot for assemblies and subassemblies for DBR components, including Common Array Power System (CAPS), and Common Array Cooling System (CACS); (2) resolution of system obsolescence that will degrade system Ao; and (3) establishment of product support engineering infrastructure needed by the DBR In-Service Engineering Agent (ISEA) and OEM onboard technicians to test and resolve issues for deployed systems on DDG 1000 Class and CVN 78. The additional DBR sustainment and infrastructure efforts will facilitate the transition of material sparing support of DBR to NAVSUP. [P40A / DC022 RADAR RESTORATION MATERIAL]: Radar Restoration funding across the FYDP procures mandatory replacement material in support of radar restoration such as arrays, overhaul kits (various components including waveguides, nuts, bolts, bearings, washers, seals, etc.), miscellaneous antenna sub-assemblies, and Engineering Change Proposals (ECPs) to address obsolescence and improve supportability. FY26 to FY27 decrease is due to funding reductions to support higher Navy requirements. [P40A / DC026 I-STALKER]: Improved Stalker (I-Stalker) is the Independent Mount (IM) Improvement to the Stalker Long Range Electro-Optic Sensor System (SLREOSS) system fielded in response to a 2016 United States Fleet Forces Command (USFFC) Operational Needs Statement (ONS). I-Stalker is currently fielded on CVN and LHA/LHD ship classes and is planned for installation on the first 10 Constellation Class FFGs. I-Stalker provides for 360-degree situational awareness and enhances ships to passively detect, classify, identify, and determine intent of current/emerging surface and air threats in support of the following warfare missions: Surface/Air Recon, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft/Fast Inshore Attack Craft (FAC/FIAC), Search & Rescue, Force Protection, and Mobility. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 1 of 38 P-1 Line #71 Volume 2 - 629 === page 710 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A I-Stalker, combined with the Navy-owned Situational Awareness System (SAwS), delivers an integrated radar and Electro-Optic/Infrared (EO/IR) control and display suite. AN/SAY-3(V)1 is the currently fielded system configuration. AN/SAY-3(V)1 consists of two (2) I-Stalker(V)1 systems and one (1) Situational Awareness System (SAwS). An Engineering Change Proposal (ECP) is in progress to address known reliability and obsolescence issues present in the I-Stalker(V)1 and deliver a Technical Data Package (TDP) for the I-Stalker(V)2. Beginning in FY25, AN/SAY-3B upgraded the AN/SAY-3 above-deck equipment (Sensor Suite and Independent Mount) via a Tech Refresh. A full shipset of AN/SAY-3B consists of two (2) I-Stalker (V)2 systems and one (1) SAwS. Existing AN/SAY-3(V)1 will be upgraded to AN/SAY-3(V)2 via a Tech Refresh. [P40A / LCS RADAR]: Funding is required to support and sustain the multiple radars installed on the Littoral Combat Ships (LCS) platforms, both Independence and Freedom classes. Funding supports life cycle planning and infrastructure/configuration management, including Diminishing Manufacturing Sources and Material Shortages (DMSMS) planning, associated hardware and software obsolescence, procurement of Engineering Change Proposals (ECPs), associated logistics products and on-board repair parts allowance requirements to enable operation, as well as Original Equipment Manufacturer (OEM) engineering services. There are multiple radar configurations in place on LCS: AN/SPS-75 and AN/SPS-80 variants on the Freedom class; and AN/SPS-77 variants on the Independence class. Bridgemaster E-Series (BME) and Sharp-Eye radars are installed on both classes. The AN/SPS-75, AN/SPS-80 and AN/SPS-77 variants are three-dimensional (3D), electronically scanned phased array radars that provide high radiated power, selectable waveforms and modern signal processing across a variety of challenging marine environments and to provide surface search capability on the LCS platforms. [P3A / DC001 - AN/SPS-73(V)]: The AN/SPS-73(V) Radar provides navigation and general surface search radar functionality on all U.S. Navy ships. The AN/SPS-73(V)12 is the Automatic Radar Plotting Aid (ARPA) Navigation Radar for the U.S. Navy being upgraded to the AN/SPS-73(V)18 Next Generation Surface Search Radar (NGSSR). NGSSR upgrade funding will be utilized for engineering changes, which will improve surface combatant's ability to engage fast attack craft/fast in shore attack craft (FAC/FIAC) tracking and periscope detection and discrimination, as well as address cybersecurity shortfalls and Commercial-Off-The-Shelf (COTS) obsolescence of the legacy AN/SPS-73 systems. The NGSSR will update the current AN/SPS-73(V)12 and replace the AN/SPS-67(V) and all commercially provided Navigation Radars fielded in the fleet. NGSSR production has been accelerated as a result of the October 2017 Commander Fleet Forces Comprehensive Review, which followed the McCain and Fitzgerald collisions. [P3A - 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR)]: The AN/SPS-48G 3-D Air Surveillance Radar is a follow-on to the existing AN/SPS-48E onboard Aircraft Carriers and large-deck Amphibious ships. AN/SPS-48G was initiated in response to Fleet complaints regarding AN/ SPS-48E reliability and supportability. Upgrade of the AN/SPS-48E with the AN/SPS-48G remains a high Fleet priority as it will reduce Operation and Support (O&S) costs and improve Operational Availability. Both factors are cited by the Fleet as unsatisfactory for the AN/SPS-48E. FY18 was the last year of AN/ SPS-48G procurements. Remaining installation funding is for advanced planning (AP) and planning yard design services allocation (DSA) which are required up to one year prior to the year of installation. DSA funds are used for Ship Installation Drawings (SIDs), Alteration Installation Team (AIT) contracting fees, and ship-checks. [P3A - 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS]: DC018 AN/SPY-1 RM&A IMPROVEMENTS - These Reliability, Maintainability, and Availability (RM&A) improvements are intended to reduce cascading failures, mitigate obsolescence issues, and improve reliability in support of Anti-Air Warfare (AAW) and Ballistic Missile Defense (BMD) missions while still providing AN/SPY-1 Radar Total Ownership Cost (TOC) reductions. Solid State Switch Assembly (SSSA) Ordnance Alteration (ORDALT) will replace legacy switch tube modulator deck. SSSAs are procured based on start of ship availability with contract delivery dates (CDD) for each shipset being three months apart on average. Procurements and installations are aligned with the DDG Modernization availability periods and include two (2) Aegis Ashore requirements. Multi-Mission Signal Processor (MMSP) Power Supply ORDALT corrects an over-voltage condition in the power supplies installed with the MMSP Classic. The program previously reduced SSSA procurements from seventy-seven (77) to fifty-four (54) DDG systems due to DDG decommissionings and AN/SPY-6(V)4 backfits (AN/SPY-6(V)4 ships do not require the SSSA ORDALT). Procurement of sixteen (16) DDG SSSA systems previously funded under BLI 2980, and the remaining thirty-eight (38) DDG procurements are reflected in this line item. Forty-four (44) installations are reflected in this budget which include six (6) systems procured in the 2980 budget. There are prior year through FY23 SSSA procurement quantities shown with no funding to accommodate the installation funding profile for systems procured in the 2980 budget (these procurement quantities are not included in the total quantities being procured in this budget). MMSP Power Supplies for DDGs (Qty 25) were procured under BLI 0900 and Aegis Ashore (Qty 2) were procured by Missile Defense Agency (MDA) in FY20. Seventeen (17) were installed under BLI 2980. FY23 funding was realigned from procurement to install to support five (5) installations that will start under BLI 2980 and finish under BLI 2981. The remaining ten (10) will be installed under BLI 2981. [P3A - 4 / DC024 - SPY-6 Family of Radars (FoR)]: SPY-6 Family of Radars (FoR), AN/SPY-6(V), Operations and Support (O&S): AN/SPY-6(V)1 radar system addresses Ballistic Missile Defense (BMD) and Air Defense (AD) capability gaps identified in the Maritime Air and Missile Defense of Joint Forces (MAMDJF) Initial Capabilities Document (ICD). AN/SPY-6(V)1 is being installed in DDG 51 Arleigh Burke class Flight III guided missile destroyers. AN/SPY-6(V)2, (V)3 and V(4) radar systems were added to the AMDR FoR ACAT 1C program as a Post-MS C major subprogram via Acquisition Program Baseline (APB) update. AN/SPY-6(V)2 is being installed in Nimitz class CVN, America class LHAs, and San Antonio class LPDs. The AN/SPY-6(V)3 is installed in Ford class CVNs. AN/SPY-6(V)4 is being installed in DDG 51 LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 2 of 38 P-1 Line #71 Volume 2 - 630 === page 711 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Arleigh Burke class Flight IIA guided missile destroyers during modernization (back-fit). Obsolescence management and technology refresh for all four radar variants will be provided by a combination of ISEA tasking and program office leadership. Funding will sustain the Navy's next generation family of radars, AN/SPY-6(V). The AN/SPY-6(V) Product Support Strategy established NSWC Port Hueneme Division as the Product Support Integrator (PSI) for overall radar system Operational Availability (Ao) and Backend Processing (BEP) subsystem(s) Life Cycle Support, and NSWC Dahlgren Division as the supporting Software Support Activity. The BEP is comprised of Commercial off the Shelf (COTS) x86 based Modular Open System Architecture (MOSA), allowing for Form-Fit-Function (FFF) replacement, between Block upgrades, with next generation server and processer technology. The program also maintains two land-based sites for live radar operations, supported by the site infrastructure, annual operating expenses, maintenance actions, and site improvements to sustain operations. The "To Complete" reflects the FY27 fielding plan and is representative of the AN/SPY-6(V)1's full 40-year life cycle across 35 ships (a total of 1400 ship years), the AN/SPY-6(V)2's average 37.1-year life cycle across 15 ships (a total of 556 ship years), the AN/SPY-6(V)3's average 50.5-year life cycle across 10 ships (a total of 505 ship years), and AN/ SPY-6(V)4's average 21.0-year life cycle across 28 ships (a total of 588 ship years). [P3A - 5 / DC025 - SPEIR BLOCK I]: Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Status of SPEIR Block I Major Milestones: Milestone B completed 3QFY22, procurement of Long Lead Material (LLM) for LRIP Lot 1 (2QFY25) and LRIP Lot 1 Balance Award (3QFY26). Funding has increased in the FYDP in alignment with the additional procurement and installations in FY27 and FY28 for DDG-51 Class Backfit. [P3A - 6 / DC027 - AN/SPQ-9B]: Beginning in FY26, all funding under BLI 2026 SPQ-9B Radar was realigned to LI 2981 In-Service Radars and Sensors. The scope of this LI changing is to consolidate the existing number of PEs/BLIs identified by BSOs and FMB to group technology projects to allow flexibility that would foster innovation and promote efficiency. PE/BLI consolidation meets the DoW Implementation Plan from the Commission on PPBE Interim Report. Funding procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability to Shipboard Combat Systems. Procures radars to support combat systems on the following ship classes: CG, LHA, DDG, CVN, LHD, LPD, U.S. Coast Guard National Security Cutter and a Training Unit. AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Miscellaneous ECPs procure product improvements generated by Engineering Change Proposals (ECPs); corrects problems reported by Fleet units; upgrades unreliable components and replaces obsolete components and parts no longer in production for AN/SPQ-9B Radar; and addresses supportability concerns. Purchases and installs ECPs, including Antenna Shock Upgrade Kits, Antenna Radar Components, Digital Signal Processor (DSP) Kits, Periscope Detection and Discrimination (PDD) Kits and engineering change kit hardware components. Antenna Shock Upgrade Kits are installed during Antenna Restorations. DSP and PDD kits are installed conjunctively via Alteration Installation Team (AIT) and can be accomplished outside of a CNO availability. Production Support provides support for production of hardware and hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance and software certification. [P3A - 7 / DC000 - ISRAEL SECURITY REPLACEMENT]: Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), CounterFast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Since the FY26 budget request,, Israel Replacement funding was received in FY25 for procurement of one (1) SPEIR Block I Crudes System and two (2) Non-FMP SPEIR Shore Site procurements. The associated FY26 and FY27 installation costs are included under PU DC025. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 3 of 38 P-1 Line #71 Volume 2 - 631 === page 712 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items less than $5 Million P-3a 1 / DC001 - AN/SPS-73(V) (TBD) P-3a 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) (TBD) - / 1.016 - / 3.135 - / 0.947 P-3a 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS (TBD) - / 43.921 - / 33.183 - / 33.517 P-3a 4 / DC024 - SPY-6 Family of Radars (FoR) (TBD) - / 46.217 - / 39.629 - / 82.765 P-3a 5 / DC025 - SPEIR BLOCK I (TBD) - / 16.970 - / 25.020 - / 26.631 P-3a 6 / DC027 - AN/SPQ-9B (TBD) - / 0.000 - / 0.000 - P-3a 7 / DC000 - ISRAEL SECURITY REPLACEMENT (TBD) - / 0.000 - / 44.700 - P-40 Total Gross/Weapon System Cost / 290.485 - / 262.890 P384 Title* / 71.709 - / 51.075 - / 55.315 - / 84.171 / - - / 84.171 / 110.652 - / 66.148 - / 43.181 - / 44.535 - / 0.000 - / 44.535 - / 0.896 - / 0.000 - / 0.896 - / 32.907 - / 0.000 - / 32.907 - / 120.870 - / 0.000 - / 120.870 - / 41.034 - / 0.000 - / 41.034 / 7.300 - / 14.533 - / 0.000 - / 14.533 / 0.000 - / 0.000 - / 0.000 - / 338.946 - / 0.000 - Exhibits Schedule Exhibit Type - Subexhibits ID CD MDAP/ MAIS Code - / 249.656 - - / 0.000 - / 338.946 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items less than $5 Million P-3a 1 / DC001 - AN/SPS-73(V) (TBD) P-5a - P-3a 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) (TBD) - / 0.935 - / 0.948 - / 0.962 - / 0.983 - / 8.000 - / 17.822 P-3a 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS (TBD) - / 43.254 - / 42.993 - / 41.933 - / 42.769 - / 71.976 - / 386.453 P-3a 4 / DC024 - SPY-6 Family of Radars (FoR) (TBD) - / 56.390 - / 83.649 - / 53.774 - / 54.829 - / 12,000.748 - P-3a 5 / DC025 - SPEIR BLOCK I (TBD) - / 44.577 - / 36.419 - / 34.827 - / 27.423 - / 3,349.839 - P-3a 6 / DC027 - AN/SPQ-9B (TBD) - / 9.689 - / 11.271 - / 10.010 - / 10.212 - / 29.119 - P-3a 7 / DC000 - ISRAEL SECURITY REPLACEMENT (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - P384 - / / 52.684 / 299.163 - - / / 57.425 / 295.691 - - / / 53.593 / 241.739 - - / - - / 54.673 / 237.608 - - / / 846.573 / 16,419.812 - - / - / 1,329.464 / 12,538.871 / 3,602.740 / 92.134 / 44.700 / 18,635.990 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Increased funding in FY27 primarily supports Dual Band Radar (DBR) Engineering Change Proposal (ECP) efforts for Cyber security, failure reporting and tracking, Government technical software and Signal Data Processor (SDP) hardware installs in support of sustainment and OEM obsolescence efforts. FY27 funding increases for SPY-6 Family of Radars (FoR) to support System Equipment Sustainment and Technology Refresh for new SPY-6 platform deliveries to establish adequate infrastructure and sparing, along with a CVN 78 Radar Replacement GFE procurement in FY27 to support the replacement of the AN/SPY-3 and AN/SPY-4 radars. FY27 funding increases for SPEIR to support installs for the CRUDES and Shore Site systems being procured under PUs DC025 and DC000. FY27 funding increase for AN/ SPQ-9B for the CVN 78 procurement, in addition to Design Services Allocation for CVN 78 planned AIT Installation. FY27 funds also increase with the addition of Littoral Combat System (LCS) funding being added to this budget to provide life cycle planning and infrastructure/configuration management, Diminishing Manufacturing Sources and Material Shortages (DMSMS), associated hardware and software obsolescence, logistics and engineering support for the AN/SPS-75 and AN/SPS-80 variants for the Freedom class and AN/SPS-77 variants for the Independence class. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 4 of 38 P-1 Line #71 Volume 2 - 632 === page 713 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 10: Other Shore Electronic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 5 of 38 P-1 Line #71 Volume 2 - 633 === page 714 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Items less than $5 Million ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) DC020 DUAL BAND RADAR (DBR) 1.1) DBR PRODUCTION SUPPORT A (1) 1.2) DBR ENGINEERING CHANGE PROPOSALS (ECPS) A 1.3) DBR SPECIAL TEST EQUIPMENT AND INFRASTRUCTURE A - - 5.455 - - 3.290 - - 3.076 - - 3.023 - - - - - 3.023 - - 16.046 - - 14.296 - - 29.683 - - 41.129 - - - - - 41.129 - - 5.851 - - 5.027 - - 4.697 - - 4.621 - - - - - 4.621 - - 27.352 - - 22.613 - - 37.456 - - 48.773 - - - - - 48.773 248 3.445 244 2.709 244 2.778 240 2.872 - - - 240 2.872 - - 0.574 - - 0.359 - - 0.370 - - 0.372 - - - - - 0.372 - - 0.315 - - 0.397 - - 0.415 - - 0.441 - - - - - 0.441 - - 0.288 - - 0.917 - - 1.564 - - 1.049 - - - - - 1.049 - - 4.622 - - 4.382 - - 5.127 - - 4.734 - - - - - 4.734 - - - 1,197K 6 7.180 1,222K 2 2.444 1,248K 4 4.990 - - - 1,248K 4 4.990 - - - 125,000.00 3 0.375 128,000.00 1 0.128 130,000.00 2 0.260 - - - 130,000.00 2 0.260 - - 3.879 - - - - - 4.419 - - 2.667 - - - - - 2.667 - - 8.786 - - 3.241 - - 3.428 - - 2.127 - - - - - 2.127 - - 27.070 - - 5.729 - - 0.373 - - 0.630 - - - - - 0.630 - - - 1,259K 7.555 1,286K 1.286 1,313K 1.313 - - - 1,313K (2) (3) Subtotal: 1) DC020 DUAL BAND RADAR (DBR) 2) DC022 RADAR RESTORATION MATERIAL 2.1) 48 ARRAYS (†) A 2.2) ANTENNA SUBASSEMBLIES A 2.3) ENGINEERING CHANGE PROPOSALS (ECPS) A 2.4) ANTENNA OVERHAUL KIT A Subtotal: 2) DC022 RADAR RESTORATION MATERIAL (4) 13,891.13 11,102.46 11,385.25 11,966.67 11,966.67 3) DC026 I-STALKER 3.1) I-STALKER (V)2 A 3.2) I-STALKER A (5)(†) SAwS (6)(†) 3.3) I-STALKER INSTALL (7) 3.4) I-STALKER PRODUCTION SUPPORT A (8) 3.5) I-STALKER ENG CHANGE PROPOSALS A (9) 3.6) I-STALKER TECH REFRESH (10)(†) A A LI 2981 - In-Service Radars and Sensors Navy 6 1 UNCLASSIFIED Page 6 of 38 1 P-1 Line #71 1 1.313 Volume 2 - 634 === page 715 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.7) I-STALKER DEPOT STANDUP A 3.8) I-STALKER SCHOOLHOUSE A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Items less than $5 Million FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - - - - 0.115 - - - - - - - - - - - - - - - - - 0.100 - - - - - - - - - - - - - - - - - 0.439 - - 0.570 - - - - - 0.570 - - 39.735 - - 24.080 - - 12.732 - - 12.557 - - - - - 12.557 - - - - - - - - - - - 0.750 - - - - - 0.750 - - - - - - - - - - - 0.135 - - - - - 0.135 - - - - - - - - - - - 17.222 - - - - - 17.222 Subtotal: 4) LCS RADAR - - 0.000 - - - - - - - - 18.107 - - - - - 18.107 Total - - 71.709 - - 51.075 - - 55.315 - - 84.171 - - - - - 84.171 (11) ESTABLISHMENT (12) 3.9) I-STALKER SPARES (13) A Subtotal: 3) DC026 I-STALKER 4) LCS RADAR 4.1) LCS ENGINEERING SUPPORT A (14) 4.2) LCS ENG CHANGE PROPOSALS (15) 4.3) LCS PARTS/ MATERIALS A (16) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) DBR Production Support funding is required to maintain the OEM to perform repairs on system components that have failed during shipboard operations, to provide OEM and Government failure reporting analysis and corrective action system (FRACAS) support and obtain the Signal Data Processor (SDP) hardware and software maintenance support for the IBM P6 computers. Current IBM P6 computers are obsolete, and no components are available for purchase by the manufacturer or third part vendors. Starting in FY27, funding is required to initiate software support for the IBM P9 computers that will be installed on CVN 78. (2) DBR ECP funding supports DBR sustainment engineering efforts, software trouble report corrections, certified software baseline integration, logistic technical manual updates, waterfront manual troubleshooting and fault isolation procedure delivery and non-recurring engineering for planning the transition of the DBR SDP computers from the obsolete IBM P6 to the next generation of IBM P9 computers for CVN 78 and IBM P10+ computers for the DDG 1000 Class. DBR funding supports cyber security technicians, failure reporting and tracking, technical manual updates, Government technical software and SDP hardware installs in support of sustainment efforts. Additionally, the OEM is tasked with ECPs associated with addressing non-recurring obsolescence engineering and the obsolescence redesigns require completion before the associated spare parts can be procured. Starting in FY27, the DBR program received additional funding to complete the design and engineering to upgrade the DBR system to ensure compatibility with GPS-based Positioning, Navigation, and Timing Service (GPNTS) services on CVN 78 and the DDG 1000 class ships. Current GPS receiver is no longer manufactured, requiring procurement of latest GPS receiver to align with GPNTS services. (3) DBR Special Test Equipment & Infrastructure (STE&I) funding will support the adaptation of the DBR tactical code to run on the new SDP operating system in three DDG 1000 Class ships and CVN 78. Funding also supports the additional infrastructure required by the DBR In-Service Engineering Agent (ISEA) and OEM onboard technicians to test and resolve issues for deployed systems on DDG 1000 Class and CVN 78. Starting in FY27, funding will support obsolescence engineering solutions for test equipment used to assess the performance of new production parts. Current test equipment is outdated, and no alternatives exist to meet repair and production rates required to support shipboard systems. (4) Radar Restoration funding across the FYDP procures mandatory replacement material in support of radar restoration such as arrays, overhaul kits (various components including waveguides, nuts, bolts, bearings, washers, seals, etc.), miscellaneous antenna sub-assemblies, and Engineering Change Proposals (ECPs) to address obsolescence and improve supportability. FY26 to FY27 decrease is due to funding reductions to support higher Navy requirements. (5) I-Stalker (V)2 (3.1) is the modernized version of I-Stalker (V)1 above-deck equipment (Sensor Suite and Independent Mount). One (1) shipset of I-Stalker (V)2 includes two (2) sets of above deck equipment. I-Stalker (V)2 systems will be procured after the completion of Engineering Change Proposals (ECPs) that address previously known reliability and obsolescence issues. FY26 to FY27 funding increase is due to procurement quantity increase which is based on production and integration timelines to support the ship availabilities and scheduling changes. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 7 of 38 P-1 Line #71 Volume 2 - 635 === page 716 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Aggregated Items Title: Items less than $5 Million (6) The Situational Awareness Subsystem (SAwS) (3.2) procurements have been added to the budget since the FY26 budget request to support the below deck requirement for I-Stalker (V)2 units. SAwS is the below-deck Government Furnished Equipment (GFE) requirement for I-Stalker (V)2. One (1) shipset of I-Stalker (V)2 includes one (1) SAwS. SAwS supporting I-Stalker (V)2 will be procured after the completion of Engineering Change Proposals (ECPs) that address previously known reliability and obsolescence issues. FY26 to FY27 funding increase is due to procurement quantity increase which is based on production and integration timelines to support the ship availabilities and scheduling changes. (7) I-Stalker Installation (3.3) funding covers Advanced Planning (AP), ship avail/product work, and ship alteration work, which is required up to two years before the year of installation. Ship avail/product work and ship alteration work include Ship Installation Drawings (SIDs), Alteration Installation Team (AIT) contracts, and shipchecks. Decrease in installation cost from FY26 to FY27 reflects I-Stalker requirements based on ship availabilities and schedules. (8) I-Stalker Production Support funding (3.4) includes Government oversight of Original Equipment Manufacturer (OEM) support, Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), and Professional Support Services (PSS). The decrease in funding from FY26 to FY27 aligns with resources available for program management, logistics, and engineering for I-Stalker (V)2. (9) I-Stalker Engineering Change Proposal (ECP) funding requirements (3.5) reflects anticipated design changes for I-Stalker (V)2 during production to address potential reliability challenges and hardware obsolescence. (10) I-Stalker Tech Refresh (3.6) funds the procurement of I-Stalker Diminishing Manufacturing Sources and Material Shortages (DMSMS) components and the replacement of the I-Stalker (V)1 with I-Stalker (V)2. Tech Refresh funds enable the program to acquire the necessary hardware needed for I-Stalker (V)2 Tech Refresh systems to replace I-Stalker (V)1 systems that are experiencing DMSMS and hardware obsolescence. Tech Refresh configurations now include the hardware for the above deck sensor suite and below deck SAwS units which have been quantified since the FY26 budget request. The increase in funding from FY26 to FY27 is due to I-Stalker (V)2 Tech Refresh procurement requirements based on the I-Stalker (V)1 replacement schedule that aligns with ship availabilities and scheduling changes. (11) I-Stalker Depot Standup (3.7) funds the establishment of a depot to maintain I-Stalker systems. Depot Standup efforts includes test equipment design, establishment of supply chain and repair procedures, facilities, and assessments. Depot Standup decreases from FY26 to FY27 to align with requirements for procurement of test equipment and efforts towards standup activities. (12) I-Stalker Schoolhouse Establishment funding (3.8) procures hardware assets and documentation for the training facility supporting the transition to a Program of Record (PoR). The schoolhouse will be the training location for sailors to become certified in operating and maintaining the I-Stalker system. Schoolhouse Standup decreases from FY26 to FY27 to align with requirements for hardware assets and documentation. (13) I-Stalker Spares (3.9) funds spares for I-Stalker (V)2 systems. This does not include funding for Initial Installation and Checkout Spares (INCO(I)) normally covered by the OPN LI 9020 budget. The increase in funding from FY26 to FY27 is based on the procurement requirements for I-Stalker (V)2 and Tech Refresh quantities in that year. (14) LCS Engineering Support (4.1) addresses obsolescence issues including any tech refreshes needed for both hardware and software, in addition to any engineering/technical support needed from the OEM. Also includes support for Engineering Support Services (ESS), Professional Support Services (PSS), cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (15) LCS Engineering Change Proposals (4.2) primarily funds product improvements, corrects problems reported by Fleet units, upgrades unreliable components, replaces obsolete components/parts no longer in production, and addresses supportability concerns associated with Diminishing Manufacturing Sources and Material Shortages (DMSMS). (16) LCS Parts/Materials (4.3) funds replenishment of Installation and Checkout Spares (INCO-R) to include spares and materials needed for production, lay-in spares, and maintenance assessment kits (MAMs) for all the radars. This does not include funding for Initial Installation and Checkout Spares (INCO(R)) normally covered by the OPN LI 9020 budget. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 8 of 38 P-1 Line #71 Volume 2 - 636 === page 717 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 Aggregated Items: Items less than $5 Million FY Contractor and Location Method/Type or Funding Vehicle 2.1) 48 ARRAYS 2025 NSWC CRANE / CRANE, IN Various NSWC/CRANE Oct 2024 Sep 2025 244 11,102.46 Y 2.1) 48 ARRAYS 2026 NSWC CRANE / CRANE, IN Various NSWC/CRANE Mar 2026 May 2026 244 11,385.25 Y 2.1) 48 ARRAYS 2027 NSWC CRANE / CRANE, IN Various NSWC/CRANE Dec 2026 Feb 2027 240 11,966.67 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) DC022 RADAR RESTORATION MATERIAL 3) DC026 I-STALKER 3.1) I-STALKER (V)2 (5) 2025 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2025 Aug 2026 6 1,197K N 3.1) I-STALKER (V)2 (5) 2026 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2026 Aug 2027 2 1,222K N 3.1) I-STALKER (V)2 (5) 2027 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2027 Aug 2028 4 1,248K N 3.2) I-STALKER SAwS (6) 2025 NSWC CRANE / CRANE, IN Various NSWC CRANE Jan 2026 Sep 2026 3 125,000.00 N 3.2) I-STALKER SAwS (6) 2026 NSWC CRANE / CRANE, IN Various NSWC CRANE Jan 2027 Sep 2027 1 128,000.00 N 3.2) I-STALKER SAwS (6) 2027 NSWC CRANE / CRANE, IN Various NSWC CRANE Aug 2027 Aug 2028 2 130,000.00 N 2025 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2025 Aug 2026 6 1,259K N 2026 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2026 Aug 2027 1 1,286K N 2027 Teledyne FLIR / Billerica, MA Various NAVSEA Aug 2027 Aug 2028 1 1,313K N 3.6) I-STALKER TECH REFRESH (10) 3.6) I-STALKER TECH REFRESH (10) 3.6) I-STALKER TECH REFRESH (10) LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 9 of 38 P-1 Line #71 Volume 2 - 637 === page 718 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 110.652 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 110.652 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / DC001 - AN/SPS-73(V) 110.652 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 66.148 43.181 44.535 0.000 44.535 52.684 57.425 53.593 54.673 - - - - - - - - - 66.148 43.181 44.535 0.000 44.535 52.684 57.425 53.593 54.673 - - - - - - - - - 66.148 43.181 44.535 0.000 44.535 52.684 57.425 53.593 54.673 Total 846.573 1,329.464 846.573 1,329.464 846.573 1,329.464 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/SPS-73(V) Radar provides navigation and general surface search radar functionality on all U.S. Navy ships. The AN/SPS-73(V)12 is the Automatic Radar Plotting Aid (ARPA) Navigation Radar for the U.S. Navy being upgraded to the AN/SPS-73(V)18 Next Generation Surface Search Radar (NGSSR). NGSSR upgrade funding will be utilized for engineering changes, which will improve surface combatant's ability to engage fast attack craft/fast in shore attack craft (FAC/FIAC) tracking and periscope detection and discrimination, as well as address cybersecurity shortfalls and Commercial-Off-The-Shelf (COTS) obsolescence of the legacy AN/SPS-73 systems. The NGSSR will update the current AN/SPS-73(V)12 and replace the AN/SPS-67(V) and all commercially provided Navigation Radars fielded in the fleet. NGSSR production has been accelerated as a result of the October 2017 Commander Fleet Forces Comprehensive Review, which followed the McCain and Fitzgerald collisions. The program is procuring a total quantity of 200 NGSSR systems for backfit ship installations. The quantity of 29 systems were procured in BLI 2980. The remaining 171 systems are being procured under this budget, 20 of which were procured in FY24. Four (4) installations for LPDs 26 and 27 (two systems per hull) were funded by COMNAVSURFPAC and are excluded from the total installation profile. Therefore, there are 196 total installations reflected on the installation profile across the two BLIs. There are prior year procurement quantities shown with no funding to accommodate displaying the installation funding profile for systems procured in BLI 2980 but being installed in this budget. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 10 of 38 P-1 Line #71 Volume 2 - 638 === page 719 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DC001 - AN/SPS-73(V) MDAP/MAIS Code: Models of Systems Affected: AN/SPS-73 Modification Type: TBD Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC001 - AN/SPS-73(V) B Kits Recurring 1.1.3) NEXT GENERATION SURFACE SEARCH RADAR - NonOrganic (17) Subtotal: Recurring 32 / 58.000 - / - - / - / 58.000 - / - - / - 32 / 58.000 - / - - / - / 58.000 - / - - / - - Subtotal: DC001 - AN/SPS-73(V) Subtotal: Procurement, All Modification Items - 6 / 20.572 - / - / 20.572 - / - 6 / 20.572 - / - / 20.572 - / - - - 6 / 20.572 / 20.572 - 6 / 21.433 / 20.572 - / 21.433 - 6 / 20.572 7 / 25.123 / 21.433 - / 25.123 - 6 / 21.433 6 / 22.676 / 25.123 - / 22.676 - 7 / 25.123 6 / 22.676 / 22.676 - / 22.676 - 6 / 22.676 6 / 22.676 / 22.676 - 120 / 407.160 / 407.160 - 120 / 407.160 / 407.160 - 183 / 577.640 / 577.640 - 183 / 577.640 / 577.640 - Support (All Modification Items) 2.1) PRODUCTION SUPPORT - (18) 2.2) MISCELLANEOUS ECP SUPPORT - (19) 2.3) ADVANCE PLANNING (AP)/ DESIGN SERVICES ALLOCATION (DSA) / 18.783 - / 24.543 - / 4.276 - / 4.967 - / - - / 4.967 - / 6.317 - / 6.317 - / 5.264 - / 6.221 / 7.347 - / 17.201 - / 5.592 - / 4.844 - / - - / 4.844 - / 5.528 - / 5.485 - / 5.303 - / 5.303 / - - / - / 9.811 - / - - / 11.248 - / 37.378 - / 41.744 Modification Item 1 of 1: DC001 - AN/SPS-73(V) - / 15.274 - / 24.404 - / 33.313 - / 14.152 Subtotal: Installation - / 15.274 - / 24.404 - / 33.313 - / 14.152 Subtotal: Support - / - - / - - / 9.868 - - / - - / - - / - - / - - - / - / 9.811 - / 11.845 - / 11.802 - / 10.567 - / 11.524 - / 9.108 - / 85.796 / 12.905 - / 69.508 - - / 11.248 / - / 22.013 - / 166.552 Installation - / 0.000 - / 14.152 - / 19.406 - / 20.500 - / 20.350 - / 20.473 - / 417.400 - / 585.272 / - - / 14.152 - / 19.406 - / 20.500 - / 20.350 - / 20.473 - / 417.400 - / 585.272 - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 110.652 66.148 43.181 44.535 0.000 UNCLASSIFIED Page 11 of 38 44.535 52.684 57.425 P-1 Line #71 53.593 54.673 846.573 1,329.464 Volume 2 - 639 === page 720 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DC001 - AN/SPS-73(V) MDAP/MAIS Code: Modification Item 1 of 1: DC001 - AN/SPS-73(V) Manufacturer Information Manufacturer Name: AN/SPS-73 Next Generation Navigation Radar - ULTRA Manufacturer Location: BRAINTREE, MA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 21 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Sep 2025 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Jun 2027 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2033 Installation Information Method of Implementation: [none specified]:: Installation Name: NEXT GENERATION SURFACE SEARCH RADAR Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 5 / 15.274 8 / 24.404 7 / 33.313 5 / 13.814 0 / 0.000 5 / 13.814 5 / 18.510 32 / 113.398 Prior Years 2 / 8.083 - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.338 0 / 0.000 0 / 0.338 0 / 0.386 5 / 12.017 1 / 3.900 - / - 0 / 0.000 6 / 16.641 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.510 0 / 0.400 5 / 15.463 1 / 3.800 0 / 2.700 6 / 22.873 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.987 7 / 16.673 0 / 5.200 7 / 22.860 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 26.700 6 / 26.700 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 22.800 6 / 22.800 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 120 / 360.000 120 / 360.000 8 / 20.473 132 / 417.400 183 / 585.272 Total 5 / 15.274 8 / 24.404 7 / 33.313 5 / 14.152 0 / 0.000 5 / 14.152 5 / 19.406 7 / 20.500 6 / 20.350 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 4 4 - - - - 3 4 - - 3 2 - - 1 4 3 - 4 - - - - 6 2 - 6 - 132 183 Out 5 1 - 2 2 - 2 148 194 - 1 3 1 3 2 - 2 1 3 - 2 - 4 - 7 - 1 - - - 4 Footnotes: (17) NGSSR production units are procured because of the October 2017 Commander Fleet Forces Comprehensive Review which is a priority requirement that is directly related to the McCain and Fitzgerald collisions. The procurement profile and the installation schedule have been adjusted in accordance with current funding levels ship availability schedules. FY26 to FY27 increase of procurements is due to procuring 0 systems in FY26 and 6 systems in FY27. Costs for installations show both shipyard and AIT installation funding for the quantity of installations. Installation costs may vary due to the scope of system removals for each ship class, the number of AN/SPS-73(V)18 systems installed on each ship (single or dual configuration) and anticipated higher shipyard estimates based on coast-wide bidding which results in LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 12 of 38 P-1 Line #71 Volume 2 - 640 === page 721 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DC001 - AN/SPS-73(V) MDAP/MAIS Code: uncertainty in location and cost. Funding for Advance Planning (AP) and Planning Yard Design Services Allocation (DSA) is customarily required over the course of the two years prior to the actual installation in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4 to support individual ship checks, ship drawing packages and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Additionally, AP and DSA costs are driven by NMP MOM milestones, based on the availability period of the installation and not by the procurement year. Out of the 200 systems being procured, qty of 13 went "In" LI 2980 and four installs are being funded by COMNAVSURFPAC, resulting in a total of 183 "Ins". A total of 194 "Outs" are reflected in this budget. Procurement and installation quantities and costs have been adjusted across the FYDP due to equipment delivery and fielding profile adjustments, and inflation. FY26 to FY27 decrease in installs is due to performing 7 installs in FY26 and 5 installs in FY27. (18) Production Support funding is for production of hardware and hardware components, which are primarily from Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Professional Support Services (PSS) and continued testing efforts. This funding also includes support for the current development of Periscope Detection and Discrimination capability, cybersecurity compliance, combat system baseline integration and software certification. Funding increases from FY26 to FY27 to support continued PDD requirements. (19) Miscellaneous ECP support is required to address hardware and software obsolescence/availability issues which requires research and investigation by the ISEA to locate, test, and provide suitable substitutes to maintain fleet navigation Readiness and Safety of Life at Sea (SOLAS). Funding will continue to be required for SPS-73 efforts until sufficient quantities of NGSSR systems are fielded and the population of legacy systems decreases accordingly. Funding decreases for FY26 to FY27 in alignment with FY27 program requirements. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 13 of 38 P-1 Line #71 Volume 2 - 641 === page 722 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 1.016 3.135 0.947 0.896 0.000 0.896 0.935 0.948 0.962 0.983 8.000 17.822 Total - - - - - - - - - - - - 1.016 3.135 0.947 0.896 0.000 0.896 0.935 0.948 0.962 0.983 8.000 17.822 - - - - - - - - - - - - 1.016 3.135 0.947 0.896 0.000 0.896 0.935 0.948 0.962 0.983 8.000 17.822 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The AN/SPS-48G 3-D Air Surveillance Radar is a follow-on to the existing AN/SPS-48E onboard Aircraft Carriers and large-deck Amphibious ships. AN/SPS-48G was initiated in response to Fleet complaints regarding AN/ SPS-48E reliability and supportability. Upgrade of the AN/SPS-48E with the AN/SPS-48G remains a high Fleet priority as it will reduce Operation and Support (O&S) costs and improve Operational Availability. Both factors are cited by the Fleet as unsatisfactory for the AN/SPS-48E. FY18 was the last year of AN/ SPS-48G procurements. Remaining installation funding is for advanced planning (AP) and planning yard design services allocation (DSA) which are required up to one year prior to the year of installation. DSA funds are used for Ship Installation Drawings (SIDs), Alteration Installation Team (AIT) contracting fees, and ship-checks. The installation costs for the final three (3) systems are included in this budget, resulting in zero (0) procurements and three (3) installations within the FYDP. There are prior year procurement quantities shown with no funding to accommodate displaying the installation funding profile for systems procured in LI 2980 but being installed in this budget. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 14 of 38 P-1 Line #71 Volume 2 - 642 === page 723 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AN/SPS-48G Modification Type: TBD Prior Years Financial Plan Modification Number / Title: 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) B Kits Recurring 1.1.1) AN/SPS-48G HARDWARE - FMP - NonOrganic (20) Subtotal: Recurring 3 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 1 of 1: DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) - / 1.016 - / 3.135 - / 0.947 - / 0.896 Subtotal: Installation - / 1.016 - / 3.135 - / 0.947 - / 0.896 - Subtotal: DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) Subtotal: Procurement, All Modification Items 3 / 0.000 - / 0.000 3 / 0.000 - / 0.000 Installation - / 0.000 - / 0.896 - / 0.935 - / 0.948 - / 0.962 - / 0.983 - / 8.000 - / 17.822 / - - / 0.896 - / 0.935 - / 0.948 - / 0.962 - / 0.983 - / 8.000 - / 17.822 - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 1.016 3.135 0.947 0.896 0.000 UNCLASSIFIED Page 15 of 38 0.896 0.935 0.948 P-1 Line #71 0.962 0.983 8.000 17.822 Volume 2 - 643 === page 724 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) MDAP/MAIS Code: Modification Item 1 of 1: DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) Manufacturer Information Manufacturer Name: Exelis Manufacturer Location: VAN NUYS, CA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPS-48G HARDWARE - FMP Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 1.016 1 / 3.135 0 / 0.947 0 / 0.896 0 / 0.000 0 / 0.896 0 / 0.935 0 / 0.948 0 / 0.962 0 / 0.983 2 / 8.000 3 / 17.822 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 1.016 Installation Cost 1 / 3.135 0 / 0.947 0 / 0.896 0 / 0.000 0 / 0.896 0 / 0.935 0 / 0.948 0 / 0.962 0 / 0.983 2 / 8.000 3 / 17.822 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 - 1 Footnotes: (20) Procurement of all AN/SPS-48G systems was previously funded under BLI 2980, and the installation costs for the final three systems are included in this budget, resulting in zero (0) procurements and three (3) installations. Installation funding for Advanced Planning (AP) and Planning Yard Design Services Allocation (DSA) is required up to one year prior to the year of installation. DSA funds are used for Ship LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 16 of 38 P-1 Line #71 Volume 2 - 644 === page 725 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / DC009 - AN/SPS-48G RADAR OBSOLESCENCE AND AVAILABILITY RECOVERY (ROAR) MDAP/MAIS Code: Installation Drawings (SIDs), Alteration Installation Team (AIT) contracting fees, and ship checks. The installation costs are variable per hull, with the difference being primarily the AP and DSA costs which are variable based on a combination of the number of future installations and the result of coast wide bidding resulting in uncertainty in location and cost. Installation funding has been adjusted to align with current ship availability schedules. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 17 of 38 P-1 Line #71 Volume 2 - 645 === page 726 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 43.921 33.183 33.517 32.907 0.000 32.907 43.254 42.993 41.933 42.769 71.976 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 43.921 33.183 33.517 32.907 0.000 32.907 43.254 42.993 41.933 42.769 71.976 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS - - - - - - - - - - - 43.921 33.183 33.517 32.907 0.000 32.907 43.254 42.993 41.933 42.769 71.976 Total 386.453 386.453 386.453 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: DC018 AN/SPY-1 RM&A IMPROVEMENTS - These Reliability, Maintainability, and Availability (RM&A) improvements are intended to reduce cascading failures, mitigate obsolescence issues, and improve reliability in support of Anti-Air Warfare (AAW) and Ballistic Missile Defense (BMD) missions while still providing AN/SPY-1 Radar Total Ownership Cost (TOC) reductions. Solid State Switch Assembly (SSSA) Ordnance Alteration (ORDALT) will replace legacy switch tube modulator deck. SSSAs are procured based on start of ship availability with contract delivery dates (CDD) for each shipset being three months apart on average. Procurements and installations are aligned with the DDG Modernization availability periods and include two (2) Aegis Ashore requirements. Multi-Mission Signal Processor (MMSP) Power Supply ORDALT corrects an over-voltage condition in the power supplies installed with the MMSP Classic. The program previously reduced SSSA procurements from seventy-seven (77) to fifty-four (54) DDG systems due to DDG decommissionings and AN/SPY-6(V)4 backfits (AN/SPY-6(V)4 ships do not require the SSSA ORDALT). Procurement of sixteen (16) DDG SSSA systems previously funded under BLI 2980, and the remaining thirty-eight (38) DDG procurements are reflected in this line item. Forty-four (44) installations are reflected in this budget which include six (6) systems procured in the 2980 budget. There are prior year through FY23 SSSA procurement quantities shown with no funding to accommodate the installation funding profile for systems procured in the 2980 budget (these procurement quantities are not included in the total quantities being procured in this budget). MMSP Power Supplies for DDGs (Qty 25) were procured under BLI 0900 and Aegis Ashore (Qty 2) were procured by Missile Defense Agency (MDA) in FY20. Seventeen (17) were installed under BLI 2980. FY23 funding was realigned from procurement to install to support five (5) installations that will start under BLI 2980 and finish under BLI 2981. The remaining ten (10) will be installed under BLI 2981. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 18 of 38 P-1 Line #71 Volume 2 - 646 === page 727 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0604501N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC018 - AN/SPY-1 RM&A IMPROVEMENTS B Kits Recurring 1.1.1) SOLID STATE SWITCH ASSEMBLY DDG HARDWARE - NonOrganic (21) 13 / 32.403 1.1.2) MMSP POWER SUPPLY DDG HARDWARE NonOrganic 10 / 0.000 (22) Subtotal: Recurring / 32.403 - Subtotal: DC018 - AN/SPY-1 RM&A IMPROVEMENTS Subtotal: Procurement, All Modification Items 5 / 24.999 - / 32.403 - / - / 24.999 - 23 / 32.403 4 / 19.998 - / 24.999 - / - / 19.998 - 5 / 24.999 3 / 18.416 - / 19.998 - / - / - - / - / 18.416 - / - 3 / 18.416 - / - / 18.416 - / - - 4 / 19.998 - - 3 / 18.416 - / - / 18.416 - 5 / 30.527 - / 18.416 - / - / 30.527 - 3 / 18.416 5 / 31.443 - / 30.527 - / - / 31.443 - 5 / 30.527 4 / 28.429 - / 31.443 - / - / 28.429 - 5 / 31.443 4 / 29.281 - / 28.429 - / - - / 29.281 - 4 / 28.429 1 / 7.540 - 4 / 29.281 / / 7.540 1 / 7.540 / 29.281 - - 44 / 223.036 / 7.540 10 / 0.000 / 223.036 - 54 / 223.036 / 223.036 - Support (All Modification Items) - / 1.806 - / 2.120 - / 2.090 - / 2.609 - / - - / 2.609 - / 2.642 - / 2.855 - / 2.866 - / 2.882 - / 2.337 - / 1.312 - / 3.824 - / 2.408 - / - - / 2.408 - / 0.752 - / 1.762 - / 3.580 - / 0.949 - / 4.143 - / 3.432 - / 5.914 - / 5.017 - / - - / 5.017 - / 3.394 - / 4.617 - / 6.446 - / 3.831 Modification Item 1 of 1: DC018 - AN/SPY-1 RM&A IMPROVEMENTS - / 7.375 - / 4.752 - / 7.605 - / 9.474 / 0.000 - / 9.474 - / 9.333 - / 6.933 - / 7.058 - Subtotal: Installation - / 7.375 - / 4.752 - / 7.605 - / 9.474 / - - / 9.474 - / 9.333 - / 6.933 - / 7.058 - 2.1) PRODUCTION SUPPORT (23) 2.2) ENGINEERING CHANGE PROPOSAL (ECP) (24) Subtotal: Support - / 14.219 - / 34.089 / 6.900 - / 23.824 - / 21.119 - / 57.913 / 9.657 - / 43.317 - / 105.504 / 9.657 - / 43.317 - / 105.504 - Installation - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 43.921 33.183 33.517 32.907 0.000 UNCLASSIFIED Page 19 of 38 32.907 43.254 42.993 P-1 Line #71 41.933 42.769 71.976 386.453 Volume 2 - 647 === page 728 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS MDAP/MAIS Code: Modification Item 1 of 1: DC018 - AN/SPY-1 RM&A IMPROVEMENTS Manufacturer Information Manufacturer Name: SOLID STATE SWITCH ASSEMBLY (SSSA) - RAYTHEON Manufacturer Location: Andover, MA (25) Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 36 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Sep 2025 Dec 2025 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Sep 2028 Dec 2028 Mar 2030 Mar 2031 Mar 2032 Mar 2033 Mar 2034 Installation Information Method of Implementation: [none specified]:: Installation Name: SOLID STATE SWITCH ASSEMBLY DDG HARDWARE Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 4.983 1 / 3.953 4 / 7.426 5 / 9.474 0 / 0.000 5 / 9.474 1 / 1.867 - / - - / - - / - 0 / 0.000 13 / 27.703 FY 2025 - / - - / - - / - - / - - / - - / - 4 / 7.466 1 / 2.311 - / - - / - 0 / 0.000 5 / 9.777 FY 2026 - / - - / - - / - - / - - / - - / - - / - 2 / 4.622 2 / 4.705 - / - 0 / 0.000 4 / 9.327 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.353 2 / 4.828 0 / 0.000 3 / 7.181 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 4.829 3 / 7.388 5 / 12.217 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 12.560 5 / 12.560 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 10.249 4 / 10.249 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 10.454 4 / 10.454 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.666 1 / 2.666 Total 2 / 4.983 4 / 9.657 17 / 43.317 44 / 102.134 Installation Cost 1 / 3.953 4 / 7.426 5 / 9.474 0 / 0.000 5 / 9.474 5 / 9.333 3 / 6.933 3 / 7.058 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - 1 - 1 1 1 1 - 2 2 1 - 1 2 2 - 2 1 - - 2 1 - - 2 2 - 17 44 Out 1 2 1 - 2 1 1 1 1 1 21 49 1 1 2 1 - - LI 2981 - In-Service Radars and Sensors Navy - 1 2 - - UNCLASSIFIED Page 20 of 38 2 1 1 - P-1 Line #71 1 2 1 1 Volume 2 - 648 === page 729 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS MDAP/MAIS Code: Modification Item 1 of 1: DC018 - AN/SPY-1 RM&A IMPROVEMENTS Installation Information Method of Implementation: [none specified]:: Installation Name: MMSP POWER SUPPLY DDG HARDWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 2.392 10 / 3.370 Prior Years 0 / 0.799 0 / 0.179 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.179 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 10 / 2.392 0 / 0.799 10 / 3.370 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10 Out 5 - - - - - - - - - - - - - - - - - - - - - 15 1 1 1 2 1 1 1 2 Footnotes: (21) SSSAs are procured based on start of ship availability with contract delivery dates (CDD) for each shipset being three months apart on average. CDD total procurements and installations also include two (2) Aegis Ashore requirements. The program reduced procurements from 77 to 54 DDG systems due to DDG decommissionings and AN/SPY-6(V)4 backfits (AN/SPY-6(V)4 ships do not require the SSSA ORDALT). The difference in "Ins" vs. "Outs" is due to realignment from LI 2980. Out of the 54 systems being procured, qty of 10 went "In" LI 2980, resulting in a total of 44 "Ins" reflected in this budget. The "Outs" in this budget total 49 due to five (5) starting in LI 2980 and completing in LI 2981. Of the seven (7) FY24 procurements, two (2) have installations in FY26 and the other five (5) will be installed in FY27. Since the FY26 budget request, the FY26 quantities increased from 3 to 4 in alignment with the revised procurement schedule. Additionally, the FY26 procurement award date was accelerated from Mar 2026 to Dec 2025 and were procured under FY25 pricing, resulting in the appearance of a significant unit cost increase from FY26 to FY27. Starting in FY27, the unit cost normalizes at pace with inflation across the FYDP. (22) (23) MMSP DDG Power Supply installation line covers associated Alteration Installation Team (AIT) and OSIC ORDALT costs. Five (5) of the "Ins" reflected in LI 2980 are reflected in the "Outs" in LI 2981. Production support includes installation engineering services, Integrated Logistics Support (ILS) documentation updates, ORDALT instructions, engineering change proposals and Diminishing Manufacturing Sources and Material Shortages (DMSMS) analysis and resolutions. FY27 increase supports requirement for additional DMSMS analysis and resolutions. (24) Engineering Change Proposal line (2.2) funds SSSA Spares replenishment and required changes as a result of the first SSSA installation and shock testing. A decrease in FY27 is due to funding reductions. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 21 of 38 P-1 Line #71 Volume 2 - 649 === page 730 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DC018 - AN/SPY-1 RM&A IMPROVEMENTS MDAP/MAIS Code: (25) Since the FY26 budget request, the FY25 award date slipped from Aug 2025 to Sep 2025 due to other higher priority contract actions. Additionally, the FY26 award date was accelerated from Mar 2026 to Dec 2025 due to the availability to award at FY25 pricing. FY25 and FY26 delivery dates have been shifted accordingly. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 22 of 38 P-1 Line #71 Volume 2 - 650 === page 731 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: P384 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 46.217 39.629 82.765 56.390 83.649 53.774 54.829 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - 46.217 39.629 82.765 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / DC024 - SPY-6 Family of Radars (FoR) - - - 46.217 39.629 82.765 120.870 - 0.000 - 120.870 - 0.000 - 120.870 0.000 120.870 120.870 120.870 To FY 2031 Complete - - - - 56.390 83.649 53.774 54.829 - - - - 56.390 83.649 53.774 54.829 12,000.748 12,000.748 12,000.748 Total 12,538.871 12,538.871 12,538.871 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: SPY-6 Family of Radars (FoR), AN/SPY-6(V), Operations and Support (O&S): AN/SPY-6(V)1 radar system addresses Ballistic Missile Defense (BMD) and Air Defense (AD) capability gaps identified in the Maritime Air and Missile Defense of Joint Forces (MAMDJF) Initial Capabilities Document (ICD). AN/SPY-6(V)1 is being installed in DDG 51 Arleigh Burke class Flight III guided missile destroyers. AN/SPY-6(V)2, (V)3 and V(4) radar systems were added to the AMDR FoR ACAT 1C program as a Post-MS C major subprogram via Acquisition Program Baseline (APB) update. AN/SPY-6(V)2 is being installed in Nimitz class CVN, America class LHAs, and San Antonio class LPDs. The AN/SPY-6(V)3 is installed in Ford class CVNs. AN/SPY-6(V)4 is being installed in DDG 51 Arleigh Burke class Flight IIA guided missile destroyers during modernization (back-fit). Obsolescence management and technology refresh for all four radar variants will be provided by a combination of ISEA tasking and program office leadership. Funding will sustain the Navy's next generation family of radars, AN/SPY-6(V). The AN/SPY-6(V) Product Support Strategy established NSWC Port Hueneme Division as the Product Support Integrator (PSI) for overall radar system Operational Availability (Ao) and Backend Processing (BEP) subsystem(s) Life Cycle Support, and NSWC Dahlgren Division as the supporting Software Support Activity. The BEP is comprised of Commercial off the Shelf (COTS) x86 based Modular Open System Architecture (MOSA), allowing for Form-Fit-Function (FFF) replacement, between Block upgrades, with next generation server and processer technology. The program also maintains two land-based sites for live radar operations, supported by the site infrastructure, annual operating expenses, maintenance actions, and site improvements to sustain operations. The "To Complete" reflects the FY27 fielding plan and is representative of the AN/SPY-6(V)1's full 40-year life cycle across 35 ships (a total of 1400 ship years), the AN/SPY-6(V)2's average 37.1-year life cycle across 15 ships (a total of 556 ship years), the AN/SPY-6(V)3's average 50.5-year life cycle across 10 ships (a total of 505 ship years), and AN/SPY-6(V)4's average 21.0-year life cycle across 28 ships (a total of 588 ship years). LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 23 of 38 P-1 Line #71 Volume 2 - 651 === page 732 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / DC024 - SPY-6 Family of Radars (FoR) MDAP/MAIS Code: P384 Related RDT&E PEs: 0604522N Models of Systems Affected: SPY-6 Family of Radars Modification Type: TBD (FoR) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC024 - SPY-6 Family of Radars (FoR) B Kits Recurring 1.1.1) SYSTEM EQUIPMENT SUSTAINMENT AND TECHNOLOGY REFRESH - Organic (26) - / 46.217 1.1.2) LAND-BASED TEST SITE MODERNIZATION AND SUSTAINMENT - Organic (27) 1.1.3) CVN 78 RADAR REPLACEMENT GFE PROCUREMENT - NonOrganic (28) Subtotal: Recurring Subtotal: DC024 - SPY-6 Family of Radars (FoR) Subtotal: Procurement, All Modification Items - / 39.629 - / 42.765 - / 40.000 - / - - / - - / - - / - - - / - - / 46.217 - / 39.629 - / 82.765 - / 46.217 - / 39.629 - / 82.765 - / 46.217 - / 39.629 - / 82.765 / 40.669 - / - - / - - / - 1 / 73.746 - / - / 114.415 - / - 1 / 114.415 - / - / 114.415 - / - - - - / 40.669 - - / 48.450 / - - 1 / 73.746 - - / 47.167 / - - / 5.461 - - / 50.443 / - - / 5.023 - - / 54.829 - / 12,000.748 / - - / - - / - / 2.475 - / - - / - - / 12,370.917 - / 40.000 1 / 86.705 / 114.415 - / 53.911 - / 52.190 - / 52.918 - / 54.829 - / 12,000.748 - / 12,497.622 1 / 114.415 - / 53.911 - / 52.190 - / 52.918 - / 54.829 - / 12,000.748 1 / 12,497.622 / 114.415 - / 53.911 - / 52.190 - / 52.918 - / 54.829 - / 12,000.748 - / 12,497.622 / 0.000 - / 0.000 - / 41.249 / - - / 0.000 - / 41.249 - - Installation Modification Item 1 of 1: DC024 - SPY-6 Family of Radars (FoR) - / 0.000 Subtotal: Installation - / 0.000 - / 0.000 - / - - / 0.000 - / 6.455 / - - / 6.455 - / 0.000 - / 6.455 - / 2.479 - / 31.459 - / 0.856 / - - / 6.455 - / 2.479 - / 31.459 - / 0.856 - - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 46.217 39.629 82.765 120.870 0.000 UNCLASSIFIED Page 24 of 38 120.870 56.390 83.649 P-1 Line #71 53.774 54.829 12,000.748 12,538.871 Volume 2 - 652 === page 733 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / DC024 - SPY-6 Family of Radars (FoR) MDAP/MAIS Code: P384 Modification Item 1 of 1: DC024 - SPY-6 Family of Radars (FoR) Manufacturer Information Manufacturer Name: CVN 78 RADAR REPLACEMENT GFE PROCUREMENT Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 36 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Oct 2026 Delivery Dates Oct 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CVN 78 RADAR REPLACEMENT GFE PROCUREMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 6.455 0 / 0.000 0 / 6.455 0 / 2.479 0 / 0.856 - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 0 / 6.455 0 / 0.856 - / - 0 / 0.000 Installation Cost 0 / 0.000 0 / 6.455 1 / 31.459 0 / 2.479 1 / 31.459 1 / 41.249 1 / 41.249 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - 1 Footnotes: (26) System Equipment Sustainment and Technology Refresh funding has been established for modernization and field repair, replacement and sparing requirements of obsolete SPY-6 hardware. The short life cycle of COTS hardware required an active sustainment strategy to manage available sparing need and achieve system readiness. Equipment consists of COTS servers, networking equipment, and supporting peripherals. The funding profile across the FYDP tracks to the ramp-up of new SPY-6 platform deliveries to provide for establishing adequate infrastructure and sparing. Configuration modernization, which LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 25 of 38 P-1 Line #71 Volume 2 - 653 === page 734 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / DC024 - SPY-6 Family of Radars (FoR) MDAP/MAIS Code: P384 occurs every 6 years, incrementally refreshes COTS x86 BEP not already refreshed through attrition, and non-COTS BEP equipment required to maintain configuration baseline and align with industry standards and infrastructure. Funding throughout the FYDP enables the program to acquire the necessary material to achieve required system readiness and have the support infrastructure in place for the fielded ships and supports O&S obsolescence management infrastructure for SPY-6(V)2 and (V)3 to support fielding on CVN, LHA, and LPD. Funding also sustains newly fielded Enterprise Air Surveillance Radar (EASR) systems, maintaining required Ao and enabling continuous large deck air defense, air traffic control, and volume search operations. Additionally, funding is allocated for the procurement and refresh of the Yard Integrated Test Suite (YITS), as well as the procurement and reconfiguration of the Ship Integrated Test Suite (SITS). (27) Land-based Test Site (LBTS) modernization and sustainment is required to validate radar equipment upgrades in production and capability upgrades to pace emerging threats. Decommissioning of AN/ SPY-6(V)1 array at CSEDS (retaining In-Phase and Quadrature Simulation (IQSIM) and Detection Simulator), refurbish to enable new install, move system to ARDEL test facility (PMRF, HI), and replace Engineering Development Model (EDM) array with it in FY26 to support testing in maritime environment with live test assets. EDM Array will be disposed of after replacement. Procurement and installation of ship representative Backend Processing System will serve as a replacement for older processors at ARDEL. (28) CVN 78 Radar Replacement GFE Procurement is a newly funded effort beginning in FY27 and beyond and supports the replacement of the AN/SPY-3 and AN/SPY-4 radars (together known as Dual-Band Radar) aboard CVN 78 with the AN/SPY-6(V)3 (and other enterprise radar suite sensors not covered in this line). This effort includes procurement of the prime radar equipment, installation of the radar equipment aboard CVN 78, checkout and light-off of equipment, and shipboard test support. The In is based on the estimated contract delivery date of Below Deck (BD) equipment, where the Out is based on the end of the Docking Planned Incremental Availability (DPIA). LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 26 of 38 P-1 Line #71 Volume 2 - 654 === page 735 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 16.970 25.020 26.631 41.034 0.000 41.034 44.577 36.419 34.827 27.423 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete - - - - - - - - - - 16.970 25.020 26.631 41.034 0.000 41.034 44.577 36.419 34.827 27.423 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / DC025 - SPEIR BLOCK I - - - - - - - - - - 16.970 25.020 26.631 41.034 0.000 41.034 44.577 36.419 34.827 27.423 3,349.839 3,349.839 3,349.839 Total 3,602.740 3,602.740 3,602.740 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Status of SPEIR Block I Major Milestones: Milestone B completed 3QFY22, procurement of Long Lead Material (LLM) for LRIP Lot 1 (2QFY25) and LRIP Lot 1 Balance Award (3QFY26). Funding has increased in the FYDP in alignment with the additional procurement and installations in FY27 and FY28 for DDG-51 Class Backfit. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 27 of 38 P-1 Line #71 Volume 2 - 655 === page 736 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DC025 - SPEIR BLOCK I MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0604501N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC025 - SPEIR BLOCK I B Kits Recurring 1.1.1) SPEIR BLOCK I - CRUDES SYSTEM NonOrganic (29) 1.1.2) SPEIR BLOCK I - LARGE DECK SYSTEM NonOrganic 1.1.3) NON-FMP SPEIR SHORE SITE - NonOrganic 1.1.4) INCO SPARES - NonOrganic - / - - / - - 1 / 11.013 (30) - (31) Subtotal: Recurring 1 / 16.226 Subtotal: DC025 - SPEIR BLOCK I - / 11.013 - - / 0.815 / 17.041 - 1 / 11.013 Subtotal: Procurement, All Modification Items / - 2 / 0.000 / - / 11.013 - 1 / 16.095 - 3 / 17.041 / 17.041 - / - - / - - / 1.212 / 17.307 - 1 / 16.433 / 17.307 / - / - - / - / - - / - / 1.237 - / - / 17.670 - / - 1 / 17.670 - / - / 17.670 - / - / 4.382 - / - / - - / - - 1 / 17.307 - - - 1 / 16.433 - / - - / - / 17.670 / - - / 2.362 / 27.368 - 1 / 17.670 - 1 / 17.080 1 / 8.244 / 1.237 / 17.670 - 1 / 16.762 - 2 / 27.368 / 27.368 - / - - / - - / 1.287 / 18.367 - 1 / 17.422 - / 18.367 / - / 18.735 72 / 1,374.154 78 / 1,474.172 - / - 24 / 570.828 24 / 570.828 1 / 10.842 / 10.842 - - / 1.341 / 10.842 - 1 / 18.735 - / - 1 / 9.501 / 1.313 / 18.735 - 1 / 18.367 - / - - - / - / 2,011.561 - 5 / 28.758 / 66.579 - / 76.146 / 2,149.904 - 96 / 2,011.561 107 / 2,149.904 / 2,011.561 - / 2,149.904 - Support (All Modification Items) 2.1) PRODUCTION SUPPORT (PS) - (32) 2.2) TECH REFRESH / 3.968 - - / - / 3.522 - - / - / 4.338 - - / - - - / 4.382 - / 4.391 - / 4.550 - / 3.939 - / 4.404 / - - / 1.567 - / 1.598 - / 1.630 - / 1.664 - / 1.989 - / 2.580 - / 3.130 - / 2.482 - / - - / 2.482 - / 3.260 - / 3.334 - / 0.643 - / 0.710 - / 5.957 - / 6.102 - / 7.468 - / 6.864 - / - - / 6.864 - / 9.218 - / 9.482 - / 6.212 - / 6.778 Modification Item 1 of 1: DC025 - SPEIR BLOCK I - / 0.000 - / 1.877 - / 1.856 - / 16.500 Subtotal: Installation - / 0.000 - / 1.877 - / 1.856 - / 16.500 2.3) ENGINEERING CHANGE PROPOSALS (ECP) (33) Subtotal: Support - / 54.303 - / 221.918 - / 45.954 - / 322.175 - / 87.797 / 228.377 / 64.082 / 380.256 Installation - / 0.000 - / 16.500 - / 7.991 - / 8.570 - / 9.880 - / 9.803 - / 1,016.103 - / 1,072.580 / - - / 16.500 - / 7.991 - / 8.570 - / 9.880 - / 9.803 - / 1,016.103 - / 1,072.580 - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 16.970 25.020 26.631 41.034 0.000 UNCLASSIFIED Page 28 of 38 41.034 44.577 36.419 P-1 Line #71 34.827 27.423 3,349.839 3,602.740 Volume 2 - 656 === page 737 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DC025 - SPEIR BLOCK I MDAP/MAIS Code: Modification Item 1 of 1: DC025 - SPEIR BLOCK I Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: Mason, OH (34) Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Aug 2025 May 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Jun 2027 Dec 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Sep 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: SPEIR BLOCK I - CRUDES SYSTEM Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - - / - - FY 2025 - / - 0 / 1.877 / - 0 / 0.480 - / - 2 / 14.118 - 0 / 0.000 2 / 14.118 - / - - / - - / - - / - 0 / 0.000 2 / 16.475 FY 2026 - / - - / - 0 / 0.791 0 / 0.802 0 / 0.000 0 / 0.802 1 / 6.042 - / - - / - - / - 0 / 0.000 1 / 7.635 FY 2027 - / - - / - - / - 0 / 0.385 0 / 0.000 0 / 0.385 0 / 0.484 1 / 6.608 - / - - / - 0 / 0.000 1 / 7.477 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 1.465 0 / 1.058 1 / 8.372 - / - 0 / 0.000 1 / 10.895 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.904 0 / 0.335 1 / 9.112 0 / 0.000 1 / 10.351 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.537 0 / 0.691 1 / 8.332 1 / 9.560 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 72 / 707.751 72 / 707.751 Total - / - 0 / 1.877 1 / 9.803 73 / 716.083 79 / 770.144 0 / 1.271 / - - 2 / 15.305 / - 0 / 0.000 2 / 15.305 1 / 7.991 1 / 8.570 1 / 9.244 / - - / - / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 1 1 - - 1 - - - 1 - - - 1 - - - 1 - - 73 79 Out - - - - - - - - - - - - - - - - - 73 79 - - 1 1 - 1 - 1 - 1 - 1 Method of Implementation: [none specified]:: Installation Name: SPEIR BLOCK I - LARGE DECK SYSTEM Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - LI 2981 - In-Service Radars and Sensors Navy / - / - / - / - / - UNCLASSIFIED Page 29 of 38 / - / - / - P-1 Line #71 / - / - / - 0 / 0.000 Volume 2 - 657 === page 738 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DC025 - SPEIR BLOCK I MDAP/MAIS Code: Modification Item 1 of 1: DC025 - SPEIR BLOCK I Installation Information Method of Implementation: [none specified]:: Installation Name: SPEIR BLOCK I - LARGE DECK SYSTEM Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 299.343 24 / 299.343 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 299.343 24 / 299.343 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 24 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 24 Method of Implementation: [none specified]:: Installation Name: NON-FMP SPEIR SHORE SITE Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - 1 / 0.585 - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.585 FY 2025 - / - - / - - / - 2 / 1.195 0 / 0.000 2 / 1.195 - / - - / - - / - - / - 0 / 0.000 2 / 1.195 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.636 - / - 0 / 0.000 1 / 0.636 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.677 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 1 / 0.585 2 / 1.195 - / - - / - 1 / 0.636 - / - 1 / 0.677 Installation Cost LI 2981 - In-Service Radars and Sensors Navy / - - 2 / 1.195 / - 0 / 0.000 UNCLASSIFIED Page 30 of 38 P-1 Line #71 / - 1 / 0.677 - / - 5 / 3.093 Volume 2 - 658 === page 739 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DC025 - SPEIR BLOCK I MDAP/MAIS Code: Modification Item 1 of 1: DC025 - SPEIR BLOCK I Installation Information Method of Implementation: [none specified]:: Installation Name: NON-FMP SPEIR SHORE SITE Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 1 - - - 2 - - - - - - - - - - - 1 - - - - - - 1 5 Out - - - - - - - - - - - - - - - - - - - - - - - 1 5 - 1 - 2 - 1 Footnotes: (29) (A) LRIP Lot 1 Long Lead Time Material (LLTM) that was planned for a 3QFY25 award will now be awarded in 4QFY25 with FY25 OPN funding; the remainder of LRIP Lot 1 will be awarded in Q3 FY26 with FY25 OPN funding. (B) SPEIR installations are phased over three years with planning efforts being conducted in the two fiscal years prior to the installation of the unit on the ship. The funding requirements are phased in accordance with the Navy Modernization Process Management and Operational Manual (NMP MOM) SL720-AA-MAN-030 Rev 4. Funding is provided in the two years before the physical shipboard installation for Design Allocation Services (DSA) and installation kit material. DSA includes ship check, ship installation drawings and bill of materials creation. Installation kit material is composed of all items marked with government furnished material on the bill of materials. These items take longer than 30 days to procure and therefore cannot be supported by the installing activity. Total cost for installations shows the cost for year of installation onboard ships and DSA in the two years prior to the installation. (C) Total procurement quantity has decreased from the initial plan to align with the inclusion of one (1) SPEIR Block I Crudes System procurement and two (2) Non-FMP SPEIR Shore Site procurements in FY25 represented in PU DC000. (D) FY26 and FY27 installation costs increase from FY26 to FY27 due to the inclusion of installation costs for the one (1) additional SPEIR Block I Crudes procurement and two (2) additional Shore Site procurements funded under PU DC000. (30) The Shore Site configurations are SPEIR Block I systems specifically designed for integration/testing and will not be installed on a ship. The procurement profile shows a quantity two (2) for FY25 with no associated funding in order to display the installation schedule for the shore site procurements represented under DC000. (31) SPEIR Spares fund spares for SPEIR systems. FY27 funding procures spares for the FY27 SPEIR unit. This does not include funding for Installation and Checkout Spares (INCO) normally covered by the OPN LI 9020 budget. (32) Production Support provides government oversight for the production of hardware and hardware components. It is composed primarily of Warfare Center support of production-related software and hardware problems through Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), and Professional Support Services (PSS). It also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (33) (34) Engineering Change Proposal (ECP) funding requirement reflects anticipated design changes during production to address reliability challenges and performance issues. The production lead time for the first lot is 22 months and 18 months for all subsequent lots. The FY25 contract award date aligns with planned program Long Lead Material authorization. FY25 delivery date is based on a 22-month lead time. The FY26 LRIP Lot #1 Balance award has been moved to the right due to priority on LRIP #1 with a corresponding delay to the delivery. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 31 of 38 P-1 Line #71 Volume 2 - 659 === page 740 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 6 / DC027 - AN/SPQ-9B MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 7.300 14.533 0.000 14.533 9.689 11.271 10.010 10.212 29.119 92.134 Total - - - - - - - - - - - - 0.000 0.000 7.300 14.533 0.000 14.533 9.689 11.271 10.010 10.212 29.119 92.134 - - - - - - - - - - - - 0.000 0.000 7.300 14.533 0.000 14.533 9.689 11.271 10.010 10.212 29.119 92.134 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Beginning in FY26, all funding under BLI 2026 SPQ-9B Radar was realigned to LI 2981 In-Service Radars and Sensors. The scope of this BLI changing is to consolidate the existing number of PEs/BLIs identified by BSOs and FMB to group technology projects to allow flexibility that would foster innovation and promote efficiency. PE/BLI 2981 consolidation meets the DoW Implementation Plan from the Commission on PPBE Interim Report. AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Radar FMP Equipment: Procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability to Shipboard Combat Systems. Procures radars to support combat systems on the following ship classes: CG, LHA, DDG, CVN, LHD, LPD, U.S. Coast Guard National Security Cutter and a Training Unit. FY27 FMP equipment increase from FY26 to FY27 is due to radar procurement for CVN 78 (planned AIT Installation during the FY29 availability Docking Planned Incremental Availability (DPIA) is scheduled for 2/9/2029-2/9/2031). The SPQ-9B Radar provides CVN 78 a Fire Control, Horizon Search, and a Secondary Marine Radar. Miscellaneous ECPs: Procures product improvements generated by Engineering Change Proposals (ECPs); corrects problems reported by Fleet units; upgrades unreliable components and replaces obsolete components and parts no longer in production for AN/SPQ-9B Radar; and addresses supportability concerns. Purchases and installs ECPs, including Antenna Shock Upgrade Kits, Antenna Radar Components, Digital Signal Processor (DSP) Kits, Periscope Detection and Discrimination (PDD) Kits and engineering change kit hardware components. Antenna Shock Upgrade Kits are installed during Antenna Restorations. DSP and PDD kits are installed conjunctively via Alteration Installation Team (AIT) and can be accomplished outside of a CNO Availability. Production Support: Provides support for production of hardware and hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance and software certification. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 32 of 38 P-1 Line #71 Volume 2 - 660 === page 741 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / DC027 - AN/SPQ-9B MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC027 - AN/SPQ-9B B Kits Recurring - / - - / - 1 / 0.456 - / - - / - - / - - / - 3 / 1.481 2 / 0.988 7 / 3.458 6 / 3.024 19 / 9.407 - / - - / - - / - 1 / 8.103 - / - 1 / 8.103 - / - - - / - - / - - / - 1 / 8.103 1.1.3) ANTENNA SHOCK UPGRADE KITS - Organic - / - - / - - / - - / - - / - - / - - / - 2 / 1.941 - / - - / - - / - 2 / 1.941 1.1.4) DIGITAL SIGNAL PROCESSOR KITS PROCUREMENTS - Organic - / - - / - - / - - / - - / - - / - - / - - 1 / 0.130 - / - - / - 1 / 0.130 / 0.000 - / - / - - / - / 0.000 - / - - / 0.456 1.1.1) PDD KITS - PROCUREMENT - Organic (35) 1.1.2) RADAR FMP EQUIPMENT - NonOrganic (36) Subtotal: Recurring - Subtotal: DC027 - AN/SPQ-9B Subtotal: Procurement, All Modification Items - - / 0.456 / 8.103 - / - 1 / 8.103 - / - - / 8.103 - / - - 1 / 0.456 / / - / 8.103 - / - 1 / 8.103 - / - - / 8.103 - / - - / 3.422 - / 1.118 - - / 3.422 / 1.118 - 5 / 3.422 / 3.458 - 3 / 1.118 6 / 3.024 / 3.458 - / 3.024 - 7 / 3.458 / 3.024 - / 19.581 - 23 / 19.581 / 19.581 - Support (All Modification Items) 2.1) MISCELLANEOUS ECPs (37) - / - - / - - / 1.548 - / 1.325 - / - - / 1.325 - / 1.638 - / 1.707 - / 1.511 (38) - / - - / - - / 2.369 - / 2.382 - / - - / 2.382 - / 2.490 - / 2.495 - / 2.577 2.2) PRODUCTION SUPPORT / - - / - / - - / - - / 0.000 - / - - / 6.579 - / 3.707 - / - - / 3.707 - / 5.974 - / 6.086 - Modification Item 1 of 1: DC027 - AN/SPQ-9B - / 0.000 / 0.000 - / 0.265 - / 2.723 / 0.000 - / 2.723 - / 3.715 - / 1.763 - Subtotal: Installation - / 0.000 / - - / 0.265 - / 2.723 / - - / 2.723 - / 3.715 - / 1.763 2.3) PDD KITS - INSTALLS - (39) Subtotal: Support 3 / 2.662 - - / - 2 / 1.846 2 / 1.884 - 5 / 4.804 / / 2.718 4 / 4.036 / 8.892 - / 0.000 - / 6.754 - / - / 13.514 13 / 12.581 / 26.095 - - / 7.729 / 28.545 29 / 27.813 / 64.087 - Installation - - - / - - / 0.000 - / 0.000 - / 8.466 / - - / 0.000 - / 8.466 Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 0.000 0.000 7.300 14.533 0.000 UNCLASSIFIED Page 33 of 38 14.533 9.689 11.271 P-1 Line #71 10.010 10.212 29.119 92.134 Volume 2 - 661 === page 742 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / DC027 - AN/SPQ-9B MDAP/MAIS Code: Modification Item 1 of 1: DC027 - AN/SPQ-9B Manufacturer Information Manufacturer Name: DRS Laurel Technologies Manufacturer Location: Largo, FL Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Delivery Dates Sep 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: RADAR FMP EQUIPMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - 0 / 0.265 0 / 2.723 0 / 0.000 0 / 2.723 0 / 3.715 1 / 1.763 - / - - / - 0 / 0.000 1 / 8.466 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 0 / 0.265 1 / 1.763 - / - - / - 0 / 0.000 Installation Cost 0 / 2.723 0 / 0.000 0 / 2.723 0 / 3.715 1 / 8.466 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - 1 Method of Implementation (Organic): PDD KITS - PROCUREMENT - Not Installed Installation Quantity: 19 Method of Implementation (Organic): ANTENNA SHOCK UPGRADE KITS - Not Installed Installation Quantity: 2 LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 34 of 38 P-1 Line #71 Volume 2 - 662 === page 743 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / DC027 - AN/SPQ-9B MDAP/MAIS Code: Modification Item 1 of 1: DC027 - AN/SPQ-9B Installation Information Method of Implementation (Organic): DIGITAL SIGNAL PROCESSOR KITS - PROCUREMENTS - Not Installed Installation Quantity: 1 Footnotes: (35) (36) A total of 47 PDD kits are being procured for the SPQ-9B program. Qty 28 were procured under LI 2026 and the remaining qty 19 are being procured under LI 2981. AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. The FY27 FMP installation increase from FY26 to FY27 is due to FY26 funding supporting the last year of remaining installation requirements on LHD 5. FY27 funding supports Design Services Allocation for CVN 78 planned AIT installation during the FY29 availability (Docking Planned Incremental Availability (DPIA) 2/9/2029-2/9/2031). (37) Miscellaneous ECP primarily funds product improvements, corrects problems reported by Fleet units, upgrades unreliable components, replaces obsolete components/parts no longer in production, and addresses supportability concerns. (38) AN/SPQ-9B Production Support funding provides support for production of hardware and production of hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance packages in the enterprise mission assurance support service (eMASS), element, and combat system certifications. (39) A total of 47 PDD kit installations are planned for the SPQ-9B program. Qty 18 installations occurred under LI 2026 and the remaining qty 29 installations are planned under LI 2981. In FY27, PDD kit installs decrease to 0. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 35 of 38 P-1 Line #71 Volume 2 - 663 === page 744 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 7 / DC000 - ISRAEL SECURITY REPLACEMENT MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 44.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 44.700 Total - - - - - - - - - - - - 0.000 44.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 44.700 - - - - - - - - - - - - 0.000 44.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 44.700 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Since the FY26 budget request, Israel Replacement funding was received in FY25 for procurement of one (1) SPEIR Block I Crudes System and two (2) Non-FMP SPEIR Shore Site procurements. The associated FY26 and FY27 installation costs are included under PU DC025. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 36 of 38 P-1 Line #71 Volume 2 - 664 === page 745 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / DC000 - ISRAEL SECURITY REPLACEMENT MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DC000 - ISRAEL SECURITY REPLACEMENT B Kits Recurring 1.1.1) ISRAEL SEC REPLACEMENT - CRUDES SYSTEM - Organic (40) 1.1.2) NON-FMP SPEIR SHORE SITE - NonOrganic 1.1.3) INCO SPARES - Organic (41) 1 / 16.226 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 16.226 - / - 2 / 22.489 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 22.489 - / / 0.000 - Subtotal: DC000 - ISRAEL SECURITY REPLACEMENT Subtotal: Procurement, All Modification Items / - - (42) Subtotal: Recurring - - / / 0.000 - - - / 5.985 - / - - / - - / - - / - - / - - / - - / - - / - / 44.700 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 44.700 - / - - / - - / - - / - - / - - / - - / - - / - / 44.700 - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / 0.000 - / / 0.000 - - / 5.985 / 44.700 3 / 44.700 - / 44.700 Installation Subtotal: Installation - / - - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2981 - In-Service Radars and Sensors Navy 0.000 44.700 0.000 0.000 0.000 UNCLASSIFIED Page 37 of 38 0.000 0.000 0.000 P-1 Line #71 0.000 0.000 0.000 44.700 Volume 2 - 665 === page 746 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 10 P-1 Line Item Number / Title: 2981 / In-Service Radars and Sensors ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / DC000 - ISRAEL SECURITY REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: DC000 - ISRAEL SECURITY REPLACEMENT Installation Information Method of Implementation (Organic): ISRAEL SEC REPLACEMENT - CRUDES SYSTEM - Not Installed Installation Quantity: 1 Footnotes: (40) (41) (42) CRUDES and Shore Site configurations are consistent with those defined under DC025. System procurement is planned for Q3FY26. System procurements are planned for Q3FY26. Funding procures spares for the Crudes and shore site systems. This does not include funding for Installation and Checkout Spares (INCO) normally covered by the OPN LI 9020 budget. LI 2981 - In-Service Radars and Sensors Navy UNCLASSIFIED Page 38 of 38 P-1 Line #71 Volume 2 - 666 === page 747 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2437 / Battle Force Tactical Network Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 62.513 62.513 62.513 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 104.019 104.019 104.019 106.583 106.583 106.583 125.661 125.661 125.661 0.000 0.000 0.000 125.661 125.661 125.661 106.397 114.216 - - 106.397 114.216 - - 106.397 114.216 109.257 109.257 109.257 To FY 2031 Complete 121.925 Continuing 121.925 121.925 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.300 - 3.502 - 3.502 - - - - - 4.802 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 2437 - Battle Force Tactical Network Navy UNCLASSIFIED Page 1 of 3 P-1 Line #72 Volume 2 - 667 === page 748 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2437 / Battle Force Tactical Network Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Battle Force Tactical Network - / 62.513 - / 104.019 - / 106.583 - / 125.661 P-40 Total Gross/Weapon System Cost - / 62.513 - / 104.019 - / 106.583 - / 125.661 - / - - / 125.661 / 0.000 - / 125.661 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 2437 - Battle Force Tactical Network Navy UNCLASSIFIED Page 2 of 3 P-1 Line #72 Volume 2 - 668 === page 749 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 2437 / Battle Force Tactical Network Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Battle Force Tactical Network FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) BATTLE FORCE TACTICAL NETWORK 1.1) Battle Force Tactical Network A - - 62.513 - - 104.019 - - 106.583 - - 125.661 - - - - - 125.661 Subtotal: 1) BATTLE FORCE TACTICAL NETWORK - - 62.513 - - 104.019 - - 106.583 - - 125.661 - - - - - 125.661 Total - - 62.513 - - 104.019 - - 106.583 - - 125.661 - - - - - 125.661 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 2437 - Battle Force Tactical Network Navy UNCLASSIFIED Page 3 of 3 P-1 Line #72 Volume 2 - 669 === page 750 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 670 === page 751 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 295.277 295.277 295.277 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 24.602 20.900 50.350 0.000 50.350 56.345 50.875 54.523 - - - - - - - - 24.602 20.900 50.350 0.000 50.350 56.345 50.875 54.523 To FY 2031 Complete - Total - 60.484 Continuing - Continuing - 60.484 Continuing - Continuing - - - - - - - - - - 24.602 20.900 50.350 0.000 50.350 56.345 50.875 54.523 60.484 Continuing Continuing 2.258 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.740 0.045 0.366 - 0.366 0.837 0.799 2.428 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Beginning in FY 2027, the program name Digital Modular radio (DMR) has been changed to Tactical Resilient Communications (TRC). The Tactical Resilient Communications (TRC) system, built around the Scalable Modular Radio Cluster (SMRC), provides critical command-and-control communications for surface ships, submarines, and strategic shore facilities. This four-channel, software-defined radio fields NSA-mandated Cryptographic Modernization-1 (CM-1) capabilities across multiple waveforms, including MUOS, SINCGARS, and SATURN. As legacy systems face obsolescence and evolving cyber threats, the SMRC Multi-Band (MB) radio variant will deliver the Advanced Cryptographic Capability mandated by the NSA, ensuring secure and interoperable communications for joint and allied forces. SMRC MB also meets the modernization requirements to replace the Digital Modular Radio (DMR) Integrated Waveform (IW)/Mobile User Objective System (MUOS). The Tactical Resilient Communications (TRC) program also fields modernized High Frequency (HF) capabilities to provide resilient beyond-line-of-sight (BLOS) communications in contested or SATCOM-denied environments. The SMRC Sub and SMRC HF radio variants are key components of this system, designated by Fleet Commanders as threshold capabilities for a Distributed Maritime Environment. The SMRC Sub variant is essential for National Command and Control, providing survivable communications for the submarine fleet. The SMRC HF variant provides resilient, beyond-line-of-sight communications by fielding modernized HF LPx waveforms with a staring receiver, which is crucial for supporting the Digital HF Mesh mandated by the HF Lead Service and for joint and coalition forces operating in SATCOM-denied environments. The FY 2027 funding increase of $29.450M provides a critical investment in SMRC Sub and SMRC HF variants, directly supporting vital warfighting Digital HF Mesh (DHFM) needs. This funding increase will procure ten (10) SMRC Sub systems and thirty-nine (39) SMRC HF systems, with associated ancillary equipment, for installation in FY 2028, equipping submarines and surface platforms with resilient, beyond-line-of-sight communications. Additionally, the funding provides for the procurement and installation of SMRC Multiband Upgrade Kits to meet an urgent NSA mandate for Advanced Cryptographic Capability, countering evolving cyber threats. This investment closes a dangerous capability gap, ensuring our forces are equipped with the modernized, secure, and resilient communications required to maintain information dominance and ensure National Command and Control in future conflicts. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 1 of 17 P-1 Line #73 Volume 2 - 671 === page 752 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / (DN 110) SMRC Multiband Radio (TBD) - / 174.332 - / 19.657 - / 18.173 - / 13.708 - / 0.000 - P-3a 2 / (DN 111) SMRC Multiband Upgrade Kits (TBD) - / 120.945 - / 4.945 - / 2.727 - / 4.329 - / 0.000 - / 4.329 P-3a 3 / (DN112) SMRC Sub and SMRC HF (TBD) / 0.000 - / 0.000 - / 0.000 - / 32.313 - / 0.000 - / 32.313 P-40 Total Gross/Weapon System Cost / 295.277 - / 24.602 - / 20.900 - / 50.350 - / 0.000 - / 50.350 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 13.708 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing P-3a 1 / (DN 110) SMRC Multiband Radio (TBD) - / 13.983 - / 12.763 - / 7.871 - / 9.016 Continuing P-3a 2 / (DN 111) SMRC Multiband Upgrade Kits (TBD) - / 2.684 - / 3.240 - / 3.893 - / 3.981 Continuing Continuing P-3a 3 / (DN112) SMRC Sub and SMRC HF (TBD) - / 39.678 - / 34.872 - / 42.759 - / 47.487 - - P-40 Total Gross/Weapon System Cost - / 56.345 - / 50.875 - / 54.523 - / 60.484 Continuing / 11.338 / 208.447 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding provides for: - Procurement of four (4) SMRC Multiband Radios with twenty (20) pieces of ancillary equipment, for installation in FY 2029. - Installation of six (6) SMRC Multiband Radios. These units were procured in FY 2025 for installation in FY 2027. - Procurement of four (4) SMRC Multiband Upgrade Kits with thirty-two (32) pieces of ancillary equipment, for installation in FY 2029. - Installation of three (3) SMRC Multiband Upgrade Kits. These units were procured in FY 2025 for installation in FY 2027. - Procurement of seven (7) enhancements for Dynamic Local Scanning (DLS) and Single Channel Ground and Airborne Radio System (SINCGARS) upgrade (eDSu), for installation in FY 2028. - Procurement of ten (10) SMRC Sub with ten (10) pieces of SMRC Sub ancillary equipment, for installation in FY 2028. - Procurement of thirty-nine (39) SMRC HF with thirty-nine (39) pieces of SMRC HF ancillary equipment, for installation in FY 2028. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 2 of 17 P-1 Line #73 Volume 2 - 672 === page 753 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / (DN 110) SMRC Multiband Radio MDAP/MAIS Code: Prior Years 174.332 174.332 174.332 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 19.657 18.173 13.708 0.000 13.708 13.983 12.763 7.871 - - - - - - - - 19.657 18.173 13.708 0.000 13.708 13.983 12.763 7.871 - - - - - - - - 19.657 18.173 13.708 0.000 13.708 13.983 12.763 7.871 To FY 2031 Complete 9.016 Continuing - Continuing - 9.016 Continuing - Total - Continuing - - 9.016 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The budget reflects Scalable Modular Radio Clusters (SMRC) Multiband(MB) Radio Procurements, previously called "Integrated Waveform (IW) and Mobile User Objective System (MUOS)" capable systems. The budget reflects individual radio procurements and ancillary equipment procurements for surface, subsurface, and shore sites. For the SMRC MB variant, the required quantity of radios and ancillary equipment is dependent on the ship class configuration, or shore site configuration. Ancillary equipment includes power amplifiers, rack systems, human machine interface, and antennae upgrades or refurbishments. [SMRC Multiband Radio Procurement] Funding provides for the procurement and installation of Scalable Modular Radio Clusters (SMRC) Multiband Radio, previously called, Integrated Waveform (IW) and Mobile User Objective System (MUOS) systems. The system is a four-channel software defined radio that provides 19 satellite communications and Line of Sight (LOS) waveforms across the High Frequency (HF), Very High Frequency (VHF) and Ultra High Frequency (UHF) spectrum. FY2027 funding provides for procurement of four (4) SMRC Multiband radios with twenty (20) pieces of ancillary equipment for installation in FY 2029. FY2027 funding also provides for installation of six (6) SMRC Multiband Radios . These units were procured in FY 2025 for installation in FY 2027. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 3 of 17 P-1 Line #73 Volume 2 - 673 === page 754 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (DN 110) SMRC Multiband Radio MDAP/MAIS Code: Models of Systems Affected: AN/USC-61(C) Related RDT&E PEs: 0604280N Modification Type: TBD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (DN 110) SMRC Multiband Radio B Kits Recurring 1.1.1) SMRC Sub Ancillary Equipment - Organic 1.1.2) SMRC Multiband Radio Procurement NonOrganic 28 / 1.698 - 62 / 52.488 6 / 2.505 144 / 27.992 38 / 7.875 (1) (2) 1.1.3) SMRC Multiband Ancillary Equipment - Organic (3) 1.1.4) SMRC Multiband Radio Procurement - USCG Organic - (4) Subtotal: Recurring / 88.857 - Subtotal: (DN 110) SMRC Multiband Radio Subtotal: Procurement, All Modification Items / 6.679 234 / 88.857 / 88.857 - - / - 44 / 12.096 / 12.096 - / - - / - - 6 / 2.540 4 / 1.727 - / - 4 / 1.727 4 / 1.762 4 / 1.797 2 / 0.916 2 / 0.934 Continuing Continuing 36 / 7.684 20 / 4.354 - / - 20 / 4.354 20 / 4.441 20 / 4.530 8 / 1.848 12 / 2.827 Continuing Continuing / - - / - / 1.716 / 12.096 - - - / - / - / 10.224 - 42 / 10.224 - - - - / - / - / 6.081 - / - - 24 / 6.081 - / - 24 / 6.081 - - / 6.081 - / - / / 6.203 - - 24 / 6.203 - / - / / 6.327 - - 24 / 6.327 - / - / / 2.764 - - 10 / 2.764 - / - - / - - / - / - 28 / 1.698 - / 8.395 / 3.761 Continuing Continuing 14 / 3.761 Continuing Continuing - / 10.224 - / 6.081 - / - - / 6.081 - / 6.203 - / 6.327 - / 2.764 - / 3.761 Continuing Continuing Support (All Modification Items) 2.1) SMRC Multiband Integration Support (5) 2.2) SMRC Multiband Production Support (6) 2.3) SMRC Multiband DSA - (7) 3.1) Consolidated Prior Year Requirements Subtotal: Support / 16.752 - / 4.054 - / 4.098 - / 3.000 - / - - / 3.000 - / 3.060 - / 3.121 - / 1.910 - / 1.948 Continuing Continuing - / 7.381 - / 0.278 - / 0.223 - / 0.304 - / - - / 0.304 - / 0.310 - / 0.316 - / 0.138 - / 0.188 Continuing Continuing - / 9.709 - / 0.863 - / 0.583 - / 0.596 - / - - / 0.596 - / 0.608 - / 0.414 - / 0.422 - / 0.430 Continuing Continuing / - - / - - / - - / 3.900 - / 3.978 - / 3.851 - / 2.470 - / 2.566 Continuing Continuing / 0.000 - / 3.727 - / 3.802 - / 2.585 - / 2.637 - / 2.689 Continuing Continuing / - - / 3.727 - / 3.802 - / 2.585 - / 2.637 - / 2.689 Continuing Continuing 9.016 Continuing Continuing 219 / 23.365 - / - - / - - - / 57.207 - / 5.195 - / 4.904 - / 3.900 Modification Item 1 of 1: (DN 110) SMRC Multiband Radio - / 28.268 - / 2.366 - / 3.045 - / 3.727 Subtotal: Installation - / 28.268 - / 2.366 - / 3.045 - / 3.727 - / - - / - - / - - / - - / - - / - 219 / 23.365 Installation - Total Total Cost (Procurement + Support + Installation) LI 3010 - Shipboard Tactical Comms Navy 174.332 19.657 18.173 13.708 0.000 UNCLASSIFIED Page 4 of 17 13.708 13.983 12.763 P-1 Line #73 7.871 Volume 2 - 674 === page 755 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (DN 110) SMRC Multiband Radio MDAP/MAIS Code: Modification Item 1 of 1: (DN 110) SMRC Multiband Radio Manufacturer Information Manufacturer Name: General Dynamics Manufacturer Location: Scottsdale, Arizona Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 16 Dates FY 2025 FY 2026 FY 2027 Contract Dates Feb 2025 Feb 2026 Feb 2027 Delivery Dates Jun 2026 Jun 2027 Jun 2028 FY 2028 Manufacturer Name: ATI (L3 Harris) FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Summerville, South Carolina Administrative Leadtime (in Months): 4 Dates FY 2029 Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 Contract Dates Feb 2026 Feb 2027 Delivery Dates Jun 2027 Jun 2028 FY 2028 FY 2029 Installation Information Method of Implementation: [none specified]:: Installation Name: SMRC Multiband Radio Procurement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 53 / 28.268 - Prior Years 4 / 2.366 5 / 3.045 - / - - / - - / - - / - - / - 0 / 0.000 62 / 33.679 FY 2025 - / - - / - - / - 6 / 3.727 0 / 0.000 6 / 3.727 - / - - / - - / - - / - 0 / 0.000 6 / 3.727 FY 2026 - / - - / - - / - - / - - / - - / - 6 / 3.802 - / - - / - - / - 0 / 0.000 6 / 3.802 FY 2027 - / - - / - - / - - / - - / - - / - - / - 4 / 2.585 - / - - / - 0 / 0.000 4 / 2.585 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.637 - / - 0 / 0.000 4 / 2.637 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.689 0 / 0.000 4 / 2.689 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.371 2 / 1.371 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.399 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 4 / 2.689 Continuing Continuing Total 53 / 28.268 4 / 2.366 5 / 3.045 / - - 6 / 3.727 / - 0 / 0.000 6 / 3.727 6 / 3.802 4 / 2.585 4 / 2.637 2 / 1.399 Installation Schedule FY 2025 PYS In 53 Out 53 FY 2026 Q1 Q2 Q3 Q4 2 1 1 - 2 1 - 1 FY 2027 Q1 Q2 Q3 Q4 3 1 1 - 3 1 - LI 3010 - Shipboard Tactical Comms Navy 1 FY 2028 Q1 Q2 Q3 Q4 2 2 2 - 2 2 - 2 FY 2029 Q1 Q2 Q3 Q4 2 2 2 - 2 2 - 2 UNCLASSIFIED Page 5 of 17 FY 2030 Q1 Q2 Q3 Q4 2 2 - - - 2 2 - FY 2031 Q1 Q2 Q3 Q4 2 2 - - - 2 P-1 Line #73 2 - Q1 Q2 Q3 Q4 TC 2 2 - - Cont. Cont. - Cont. Cont. - 2 2 Tot Volume 2 - 675 === page 756 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (DN 110) SMRC Multiband Radio MDAP/MAIS Code: Modification Item 1 of 1: (DN 110) SMRC Multiband Radio Installation Information Method of Implementation (Organic): SMRC Sub Ancillary Equipment Installation Quantity: 28 Method of Implementation (Organic): SMRC Multiband Ancillary Equipment Installation Quantity: 0 Footnotes: (1) (2) The budget reflects prior year procurements of Scalable Modular Radio Clusters (SMRC) Sub Ancillary Equipment, previously called as "Sub Ancillary Equipment - Afloat" a) Scalable Modular Radio Clusters (SMRC) Multiband Radio (previously "IW and MUOS radio") procurements and ancillary equipment procurements separately, for surface and subsurface platforms. b) Due to administrative lead time (ALT) of four (4) months, production lead time (PLT) of sixteen (16) months, and integration lead time of four (4) months, procured SMRC Multiband Radio for both afloat and ashore must be procured two (2) years prior to installation. c) Procurement quantities are driven by ship class configurations and ancillary equipment (racks, power amplifiers, HMI, & antenna refurbishments/upgrades). Installation cost is the complete cost to install the SMRC Multiband Radio with all required ancillary equipment. d) Procurement and Installation quantities will vary between budget submissions as the fielding plan changes due to schedule changes for ships decommissioning and current ship availability periods. e) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (3) a) Scalable Modular Radio Clusters (SMRC) Multiband Ancillary Equipment (previously called "Surface Ancillary Equipment - Afloat") procurements b) Variation in unit costs for the ancillary unit costs is due to the number of upgrade kits being procured each year. Quantity and cost per unit vary depending on the ship class being installed each year c) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (4) (5) (6) (7) a) The budget reflects prior year procurements of Scalable Modular Radio Clusters (SMRC) Multiband Radio (previously called "IW and MUOS Radio Procurement - USCG") Scalable Modular Radio Clusters (SMRC) Multiband integration support, previously called "IW and MUOS System Integration Support" Scalable Modular Radio Clusters (SMRC) Multiband Production Support, previously called "IW and MUOS System Production Support" a) Scalable Modular Radio Clusters (SMRC) Multiband Design Services Allocation (DSA), previously called "IW and MUOS System DSA" b) Pre-Installation DSA are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include system operational verification tests (SOVT) and system drawings closeout requirements. DSA costs will fluctuate each FY as it is a factor of the number of installations in any given fiscal year. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 6 of 17 P-1 Line #73 Volume 2 - 676 === page 757 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: Prior Years 120.945 120.945 120.945 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 4.945 2.727 4.329 0.000 4.329 2.684 3.240 3.893 - - - - - - - - 4.945 2.727 4.329 0.000 4.329 2.684 3.240 3.893 - - - - - - - - 4.945 2.727 4.329 0.000 4.329 2.684 3.240 3.893 To FY 2031 Complete 3.981 Continuing - Continuing - 3.981 Continuing - Total - Continuing - - 3.981 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding provides for the procurement and installation of Scalable Modular Radio Clusters (SMRC) Multiband Upgrade Kits, previously called, "Integrated Waveform (IW) and Mobile User Objective System (MUOS) system upgrade kits. SMRC Multiband Upgrade Kits are the components required to enhance formerly fielded systems with the IW and MUOS capability. NSA has directed all HAIPE platforms to upgrade to the Advanced Cryptographic Capability to address advancing Cyber threats. The budget reflects individual radio upgrade kit procurements and ancillary equipment procurements separately, for surface and subsurface platforms. The required quantity of radio upgrade kits and ancillary equipment is dependent on the ship class configuration. Ancillary equipment includes power amplifiers, human machine interface, and antennae upgrades or refurbishments. [SMRC Multiband Upgrade Kits Procurement] Funding provides for the procurement and installation of Scalable Modular Radio Clusters (SMRC) Multiband Upgrade Kits, previously called, "Integrated Waveform (IW) and Mobile User Objective System (MUOS) system upgrade kits. SMRC Multiband Upgrade Kits are the components required to enhance formerly fielded systems with the IW and MUOS capability. The FY27 budget provides for increased procurement of SMRC Multiband Upgrade Kits to meet an urgent National Security Agency (NSA) mandate for Advanced Cryptographic Capability. This investment is critical to counter rapidly evolving cyber threats and to protect our most vital communications. Delaying this upgrade would leave warfighters with vulnerable, outdated cryptography, creating an unacceptable risk in a contested environment. FY2027 funding provides for procurement of four (4) SMRC Multiband Upgrade Kit with thirty-two (32) pieces of ancillary equipment, for installation in FY 2029. In addition, FY2027 funding provides for installation of three (3) SMRC Multiband Upgrade Kit. These units were procured in FY 2025 for installation in FY 2027. The seven (7) month Administrative Lead Time (ALT) for SMRC Multiband Upgrade Kit system procurements allows for the identification and receipt of other customer funds in order to take advantage of favorable quantity pricing. The twelve (12) month Production Lead Time (PLT) for SMRC Multiband Upgrade Kit delivery is due to varying PLT's from multiple ancillary equipment vendors that are then integrated into the final product. Ancillary equipment is provided to Naval Information Warfare Center (NIWC) Pacific, for integration, assembly and test. SMRC Multiband Upgrade Kits required a four (4) month integration lead time after PLT, prior to installation. [SMRC eDSu] FY2027 funding provides for procurement of seven (7) enhancements for Dynamic Local Scanning (DLS) and Single Channel Ground and Airborne Radio System (SINCGARS) upgrade (eDSu), for installation in FY28. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 7 of 17 P-1 Line #73 Volume 2 - 677 === page 758 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: eDSu supports NSA-mandated cryptographic modernizations in order to keep pace with rapidly evolving cyber security threats and meet emerging operational demands. These technical insertions include v6.5.6, which delivers an NSA-mandated Single Channel Ground and Airborne Radio System (SINCGARS) 3.1 software upgrade to the systems with a hardware component to support the fleet with Dynamic Local Scanning (DLS) capabilities. DLS is a feature for MUOS transmit, which scans the local spectrum and prevents signal interference during MUOS transmissions and is required per MIL-STD 188/187A. SINCGARS provides VHF-FM low band anti-jam frequency hopping communications ISO joint USMC-USN operations. Funding will also be used for NSA-mandated cryptographic modernization requirement for MUOS waveform 3.2. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 8 of 17 P-1 Line #73 Volume 2 - 678 === page 759 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: Models of Systems Affected: AN/USC-61(C) Related RDT&E PEs: 0604280N Modification Type: TBD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (DN 111) SMRC Multiband Upgrade Kits B Kits Recurring 1.1.1) SMRC Multiband Upgrade Kits Procurement NonOrganic (8) 1.1.2) SMRC Multiband Ancillary Equipment Upgrade Organic (9) 1.1.3) Engineering Change Orders (ECOs) - Organic 1.1.4) SMRC eDSu - NonOrganic 99 / 17.854 3 / 0.174 1 / 0.059 4 / 0.241 - / - 4 / 0.241 5 / 0.307 5 / 0.312 8 / 0.510 6 / 0.390 Continuing Continuing 286 / 10.736 14 / 0.561 10 / 0.412 32 / 1.345 - / - 32 / 1.345 10 / 0.429 10 / 0.437 10 / 0.446 12 / 0.546 Continuing Continuing - - - / 56.243 - (10) Subtotal: Recurring / 84.833 - Subtotal: (DN 111) SMRC Multiband Upgrade Kits Subtotal: Procurement, All Modification Items / - 385 / 84.833 / 0.557 1 / 0.140 - / 1.432 18 / 1.432 / 0.614 / - - / - - 7 / 1.029 - - / - 7 / 1.029 / 2.615 - / - - 43 / 2.615 - / - 43 / 2.615 6 / 0.865 - / 1.950 17 / 1.950 - / - / 2.615 - / - - 4 / 0.600 - / 1.336 19 / 1.336 / - - 4 / 0.612 - / 1.361 19 / 1.361 / - / - Continuing Continuing 4 / 0.636 - Continuing Continuing / 1.572 Continuing Continuing 22 / 1.572 Continuing Continuing 4 / 0.624 - / 1.580 22 / 1.580 - / 84.833 - / 1.432 - / 1.950 - / 2.615 - / - - / 2.615 - / 1.336 - / 1.361 - / 1.580 - / 1.572 Continuing Continuing - / 1.602 - / 0.079 - / 0.057 - / 0.130 - / - - / 0.130 - / 0.066 - / 0.068 - / 0.079 - / 0.078 Continuing Continuing - / 5.789 - / 0.281 - / 0.346 - / 0.104 - / - - / 0.104 - / 0.220 - / 0.192 - / 0.272 - / 0.316 Continuing Continuing - / 7.391 - / 0.360 - / 0.403 - / 0.234 - / - - / 0.234 - / 0.286 - / 0.260 - / 0.351 - / 0.394 Continuing Continuing / 0.000 - / 1.480 - / 1.062 - / 1.619 - / 1.962 - / 2.015 Continuing Continuing / - - / 1.480 - / 1.062 - / 1.619 - / 1.962 - / 2.015 Continuing Continuing 3.981 Continuing Continuing - Support (All Modification Items) 2.1) SMRC Multiband Upgrade Kits Production Support 2.2) SMRC Multiband Upgrade Kits DSA (11) (12) Subtotal: Support Installation Modification Item 1 of 1: (DN 111) SMRC Multiband Upgrade Kits - / 28.721 - / 3.153 - / 0.374 - / 1.480 Subtotal: Installation - / 28.721 - / 3.153 - / 0.374 - / 1.480 - Total Total Cost (Procurement + Support + Installation) LI 3010 - Shipboard Tactical Comms Navy 120.945 4.945 2.727 4.329 0.000 UNCLASSIFIED Page 9 of 17 4.329 2.684 3.240 P-1 Line #73 3.893 Volume 2 - 679 === page 760 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: Modification Item 1 of 1: (DN 111) SMRC Multiband Upgrade Kits Manufacturer Information Manufacturer Name: General Dynamics Manufacturer Location: Scottsdale, Arizona Administrative Leadtime (in Months): 7 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates May 2025 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Delivery Dates May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 May 2032 Manufacturer Name: General Dynamics Manufacturer Location: Scottsdale, Arizona Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 Installation Information Method of Implementation: Method:: Installation Name: MUOS Upgrade Kits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 86 / 28.721 12 / 3.153 - Prior Years 1 / 0.267 - / - - / - - / - - / - - / - 0 / 0.000 99 / 32.141 FY 2025 - / - - / - - / - 3 / 0.825 0 / 0.000 3 / 0.825 - / - - / - - / - - / - 0 / 0.000 3 / 0.825 FY 2026 - / - - / - - / - - / - - / - - / - 1 / 0.283 - / - - / - - / - 0 / 0.000 1 / 0.283 FY 2027 - / - - / - - / - - / - - / - - / - - / - 4 / 1.165 - / - - / - 0 / 0.000 4 / 1.165 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.499 - / - 0 / 0.000 5 / 1.499 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.543 0 / 0.000 5 / 1.543 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 2.518 8 / 2.518 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.926 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 5 / 1.543 Continuing Continuing Total LI 3010 - Shipboard Tactical Comms Navy 86 / 28.721 12 / 3.153 1 / 0.267 / - - 3 / 0.825 / - 0 / 0.000 UNCLASSIFIED Page 10 of 17 3 / 0.825 1 / 0.283 4 / 1.165 P-1 Line #73 5 / 1.499 6 / 1.926 Volume 2 - 680 === page 761 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: Modification Item 1 of 1: (DN 111) SMRC Multiband Upgrade Kits Installation Information Method of Implementation: Method:: Installation Name: MUOS Upgrade Kits Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 86 6 4 2 - 1 - - - 1 1 1 - 1 - - - 2 2 - - 2 3 - - 2 3 - - Cont. Cont. Out 86 6 4 - - 1 1 - - - Cont. Cont. - 2 - 1 - 1 - 1 - 2 2 - - 2 3 - - 2 3 Tot Method of Implementation: [none specified]:: Installation Name: SMRC eDSu Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 0.107 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.107 FY 2026 - / - - / - - / - 6 / 0.655 0 / 0.000 6 / 0.655 - / - - / - - / - - / - 0 / 0.000 6 / 0.655 FY 2027 - / - - / - - / - - / - - / - - / - 7 / 0.779 - / - - / - - / - 0 / 0.000 7 / 0.779 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 0.454 - / - - / - 0 / 0.000 4 / 0.454 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.463 - / - 0 / 0.000 4 / 0.463 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.472 0 / 0.000 4 / 0.472 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.481 4 / 0.481 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 1 / 0.107 Installation Cost 6 / 0.655 0 / 0.000 6 / 0.655 7 / 0.779 4 / 0.454 4 / 0.463 4 / 0.472 / - - / - - 4 / 0.481 / - / - 30 / 3.411 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 1 - - - 2 2 2 - 2 2 3 - 2 2 - - 2 2 - - 2 2 - - 4 30 Out - - - - - - - 2 2 2 2 - 4 30 - 1 - 2 - 3 Method of Implementation (Organic): SMRC Multiband Ancillary Equipment Upgrade - 2 2 - - 2 2 - - 2 2 Installation Quantity: 0 Footnotes: LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 11 of 17 P-1 Line #73 Volume 2 - 681 === page 762 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (DN 111) SMRC Multiband Upgrade Kits MDAP/MAIS Code: (8) a) Scalable Modular Radio Clusters (SMRC) Multiband Upgrade Kits Procurements, previously called, "Integrated Waveform (IW) and Mobile User Objective System (MUOS) system upgrade kits Procurement", and ancillary equipment procurements separately for surface and subsurface platforms. b) The twelve (12) month Production Lead Time (PLT) for SMRC Multibank Upgrade Kit delivery is due to varying PLT's from multiple ancillary equipment vendors that are then integrated into the final product. SMRC Multiband Upgrade Kits required a four (4) month integration lead time after PLT, prior to installation. c) Procurement quantities are driven by afloat upgrade kit configurations and ancillary equipment (racks, power amplifiers & antenna upgrades), which is dependent upon ship class. Installation cost is the complete cost to install the SMRC Multiband Upgrade Kits and all required ancillary equipment. d) There are 5 different SMRC Multiband Upgrade Kit afloat configurations (3 surface & 2 subsurface) where each configuration ranges from 1 - 3 upgrade kits and a unique set of ancillary equipment. e) Procurement and Installation quantities will vary between budget submissions as the fielding plan changes due to decommissions and current ship availability. f) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (9) a) Scalable Modular Radio Clusters (SMRC) Multiband Ancillary Equipment Upgrade, previously called "Ancillary Equipment Upgrade" b) Variation in unit costs for the ancillary unit costs is due to the number of upgrade kits being procured each year. Quantity and cost per unit vary depending on the ship class being installed each year. (10) (11) Due to administrative lead time of two (2) months and production lead time of ten (10) months, the eDSu units must be procured one (1) year prior to installation. Scalable Modular Radio Clusters (SMRC) Multiband Upgrade Kits Production Support, previously called, "Integrated Waveform (IW) and Mobile User Objective System (MUOS) system Upgrade Kits Production Support" (12) a) Scalable Modular Radio Clusters (SMRC) Multiband Upgrade Kits Design Services Allocation (DSA), previously called, "Integrated Waveform (IW) and Mobile User Objective System (MUOS) system upgrade kits DSA" b) Pre-Installation DSA are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include system operational verification tests (SOVT) and system drawings closeout requirements. DSA costs will fluctuate each FY as it is a factor of the number of installations in any given fiscal year. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 12 of 17 P-1 Line #73 Volume 2 - 682 === page 763 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / (DN112) SMRC Sub and SMRC HF MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 0.000 0.000 0.000 32.313 0.000 32.313 39.678 34.872 42.759 47.487 11.338 - - - - - - - - - - - 0.000 0.000 0.000 32.313 0.000 32.313 39.678 34.872 42.759 47.487 11.338 - - - - - - - - - - - 0.000 0.000 0.000 32.313 0.000 32.313 39.678 34.872 42.759 47.487 11.338 Total 208.447 208.447 208.447 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Tactical Resilient Communications (TRC) program also fields modernized High Frequency (HF) capabilities to provide resilient beyond-line-of-sight (BLOS) communications in contested or SATCOM-denied environments. The SMRC Sub and SMRC HF radio variants are key components of this system, designated by Fleet Commanders as threshold capabilities for a Distributed Maritime Environment. The SMRC Sub variant is essential for National Command and Control, providing survivable communications for the submarine fleet. The SMRC HF variant provides resilient, beyond-line-of-sight communications by fielding modernized HF LPx waveforms with a staring receiver, which is crucial for supporting the Digital HF Mesh mandated by the HF Lead Service and for joint and coalition forces operating in SATCOM-denied environments. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 13 of 17 P-1 Line #73 Volume 2 - 683 === page 764 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / (DN112) SMRC Sub and SMRC HF MDAP/MAIS Code: Modification Type: TBD Models of Systems Affected: goto:javascript:history.back() Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (DN112) SMRC Sub and SMRC HF B Kits Recurring 1.1.1) SMRC Sub - NonOrganic (13) 1.1.2) SMRC Sub Ancillary Equipment - Organic 1.1.3) SMRC HF - NonOrganic (14) (15) 1.1.4) SMRC HF Ancillary Equipment - Organic - / - - / - - / - - / - - - / - - / - - - Subtotal: (DN112) SMRC Sub and SMRC HF Subtotal: Procurement, All Modification Items / - - (16) Subtotal: Recurring - - 10 / 4.300 - / - / - 10 / 2.000 - / - / - 39 / 17.550 - / - 39 / 1.950 10 / 4.300 14 / 6.140 15 / 6.711 10 / 2.000 14 / 2.856 15 / 3.121 39 / 17.550 30 / 13.770 20 / 9.364 / - - / - - / - - / - / 0.000 - / - - / - - / 25.800 - / - - 39 / 1.950 / - - / - - / - 98 / 25.800 - / - 98 / 25.800 / 0.000 - / - - / - - / 25.800 - / - - / 25.800 / 25.800 30 / 1.530 / 24.296 - 88 / 24.296 / 24.296 - 15 / 6.845 5 / 2.327 - / - 15 / 3.184 5 / 1.082 - / - 59 / 12.243 36 / 17.191 48 / 23.380 - / - 173 / 81.255 20 / 1.040 / 20.236 - 70 / 20.236 / 20.236 - 36 / 1.909 / 29.129 - 102 / 29.129 / 29.129 - 48 / 2.596 - / 29.385 - 106 / 29.385 - / 29.385 - / / 0.000 - / / 0.000 - 59 / 26.323 173 / 9.025 / 128.846 - 464 / 128.846 / 128.846 - Support (All Modification Items) 2.1) SMRC HF Non-Recurring Engineering (NRE) - / - - / - - / - - / 1.032 - / - - / 1.032 / - - / - 2.2) SMRC HF Integration Support - / - - / - - / - - / 4.191 - / - - / 4.191 - / 4.235 - / 3.514 - / 3.971 - / 4.963 - / - 2.3) SMRC HF Production Support - / - - / - - / - - / 1.290 - / - - / 1.290 - / 1.215 - / 1.012 - / 1.456 - / 1.469 - / - - - / - - / - - / - / - - / - / - - / 0.382 - / 1.491 - / 1.310 - / 1.244 - / - - - / 0.000 - / - - / - - / 6.513 - / - - / 6.513 - / 5.832 - / 6.017 - / 6.737 - / 7.676 Modification Item 1 of 1: (DN112) SMRC Sub and SMRC HF - / 0.000 / 0.000 - / 0.000 / 0.000 - / 0.000 - / 9.550 - / 8.619 - / 6.893 - / 10.426 Subtotal: Installation - / 0.000 / - - / 9.550 - / 8.619 - / 6.893 - / 10.426 2.4) SMRC HF DSA (17) Subtotal: Support - - - / - - / - - / - - - / 1.032 / 20.874 / 6.442 / 4.427 / 0.000 - / 32.775 - / 11.338 - / 46.826 - / 11.338 - / 46.826 - Installation - / 0.000 - / - - / - - / - - / - - - Total Total Cost (Procurement + Support + Installation) LI 3010 - Shipboard Tactical Comms Navy 0.000 0.000 0.000 32.313 0.000 UNCLASSIFIED Page 14 of 17 32.313 39.678 34.872 P-1 Line #73 42.759 47.487 11.338 208.447 Volume 2 - 684 === page 765 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / (DN112) SMRC Sub and SMRC HF MDAP/MAIS Code: Modification Item 1 of 1: (DN112) SMRC Sub and SMRC HF Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: Rochester, NY Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 9 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Sep 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: SMRC Sub Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 10 / 1.750 - / - - / - - / - 0 / 0.000 10 / 1.750 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 2.499 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 15 / 2.731 - / - 0 / 0.000 15 / 2.731 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 2.786 0 / 0.000 15 / 2.786 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.947 5 / 0.947 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - Installation Cost 14 / 2.499 10 / 1.750 14 / 2.499 15 / 2.731 15 / 2.786 / - - 5 / 0.947 / - 59 / 10.713 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - 2 4 4 2 4 4 4 3 4 4 4 3 4 4 4 5 59 Out - - - - - - - - - - - - - - 2 4 4 2 4 4 4 3 4 4 4 3 4 4 4 5 59 Method of Implementation: [none specified]:: Installation Name: SMRC HF Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - - - - - - - - - - - Prior Years LI 3010 - Shipboard Tactical Comms Navy / - / - / - / - / - UNCLASSIFIED Page 15 of 17 / - / - / - P-1 Line #73 / - / - / - / - Volume 2 - 685 === page 766 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / (DN112) SMRC Sub and SMRC HF MDAP/MAIS Code: Modification Item 1 of 1: (DN112) SMRC Sub and SMRC HF Installation Information Method of Implementation: [none specified]:: Installation Name: SMRC HF Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 39 / 7.800 - / - - / - - / - 0 / 0.000 39 / 7.800 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 30 / 6.120 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 20 / 4.162 - / - 0 / 0.000 20 / 4.162 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 36 / 7.640 0 / 0.000 36 / 7.640 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / 10.391 48 / 10.391 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - Installation Cost 30 / 6.120 39 / 7.800 30 / 6.120 20 / 4.162 - / - - / - - 36 / 7.640 / - 48 / 10.391 - / - 173 / 36.113 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - 9 10 10 10 - 10 10 10 - 10 5 5 6 10 10 10 48 173 Out - - - - - - - - - - - - - 9 10 10 10 - 10 10 10 - 10 5 5 6 10 10 10 48 173 Method of Implementation (Organic): SMRC Sub Ancillary Equipment Installation Quantity: 59 Method of Implementation (Organic): SMRC HF Ancillary Equipment Installation Quantity: 173 Footnotes: (13) a) Scalable Modular Radio Clusters (SMRC) Sub procurements, and ancillary equipment procurements separately, for surface and subsurface platforms. b) Due to administrative lead time of three (3) months and production lead time of nine (9) months, the SMRC sub variant must be procured one (1) year prior to installation c) Procurement quantities are driven by ship class configurations and ancillary equipment (racks, power amplifiers, HMI, & antenna refurbishments/upgrades). A submarine will need 1 Qty SMRC Sub with staring receiver and 1 Qty sub ancillary per submarine. Installation cost is the complete cost to install the SMRC Sub with all required ancillary equipment. d) Procurement and Installation quantities will vary between budget submissions as the fielding plan changes due to schedule changes for ships decommissioning and current ship availability periods. e) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (14) a) Variation in unit costs for the Scalable Modular Radio Clusters (SMRC) ancillary unit costs is due to the number of upgrade kits being procured each year. Quantity and cost per unit vary depending on the ship class being installed each year. b) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 16 of 17 P-1 Line #73 Volume 2 - 686 === page 767 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3010 / Shipboard Tactical Comms ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / (DN112) SMRC Sub and SMRC HF MDAP/MAIS Code: (15) a) Scalable Modular Radio Clusters (SMRC) High Frequency (HF) procurements and ancillary equipment procurements separately, for surface and subsurface platforms. b) Due to administrative lead time of three (3) months and production lead time of nine (9) months, the SMRC sub and SMRC HF variants must be procured one (1) year prior to installation. c) Procurement quantities are driven by ship class configurations and ancillary equipment (racks, power amplifiers, HMI, & antenna refurbishments/upgrades). A Force Level ship will need 4 Qty SMRC HF with staring receiver and 4 Qty ancillary per ship. A Unit Level ship will need 2 Qty SMRC HF with staring receiver and 2 Qty ancillary per ship. A shore site will need 3 Qty SMRC HF and 3 Qty ancillary per location. Installation cost is the complete cost to install the SMRC HF with all required ancillary equipment. d) Procurement and Installation quantities will vary between budget submissions as the fielding plan changes due to schedule changes for ships decommissioning and current ship availability periods. e) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (16) a) Variation in unit costs for the ancillary unit costs is due to the number of SMRCs being procured dependent on radio count requirements for the specific ship class being procured for each year (quantity and cost per unit vary depending on the ship class being installed each year). b) Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, material conditions of the ship requiring additional work during delivery, and complexity of the alteration is in excess of the original estimates. (17) Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include system operational verification tests (SOVT) and system drawings closeout requirements. DSA costs will fluctuate each FY as it is a factor of the number of installations in any given fiscal year. LI 3010 - Shipboard Tactical Comms Navy UNCLASSIFIED Page 17 of 17 P-1 Line #73 Volume 2 - 687 === page 768 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 688 === page 769 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Ship Communications Automation Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,507.370 1,507.370 1,507.370 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 103.546 103.546 103.546 162.075 162.075 162.075 156.605 - 0.000 - 156.605 - 0.000 - 156.605 0.000 156.605 156.605 156.605 172.342 172.342 172.342 174.794 174.794 174.794 182.014 182.014 - To FY 2031 Complete 188.225 Continuing 188.225 Total - Continuing Continuing - Continuing - - 182.014 188.225 Continuing Continuing 18.720 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.353 0.567 6.854 - 6.854 8.744 5.079 20.149 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Ship Communication Automation (M2PQ): With the evolution of afloat networks programs migrating into the Consolidated Afloat Networks and Enterprise Services (CANES) program, the Ship Communications Automation budget line will continue to support Automated Digital Network System (ADNS), Legacy Network Operation Rolling Tide (ORT), Tactical Messaging (formerly Command and Control Official Information eXchange (C2OIX)), Shore Tactical Assured Command and Control (STACC) (formerly Tactical Switching) and Piers / Enterprise Pier Connectivity Architecture (EPCA) programs. Automated Digital Network System (ADNS): ADNS provides cyber-hardened warfighting critical, afloat-to-shore wide area networking. Capabilities include routing, switching, baseband, configuration and monitoring capabilities that interconnect Fleet tactical and coalition partner enclaves worldwide. ADNS leverages Commercial Off-the-Shelf/ Government Off-the-Shelf (COTS/GOTS) equipment and network protocols as specified by the joint technical architecture and in support of meeting the ability to connect in a range of contested battlespace environments in support of expanding the Fleets' digital competitive advantage. ADNS INC III combines all Navy Tactical Voice, secure Communications Interoperability Protocol Inter-Working Function, Video, data requirements into a converged IP data stream, and Assured Command and Control (C2) capabilities. This includes Secure Communication Interoperability-Protocol Interworking Function (SCIP-IWF) for secure telephony over IP. In addition, the INC III architecture will incorporate an IPv4/IPv6 dual stack and a Cipher-Text security architecture to align to the Global Information Grid (GIG) in order to mesh Navy tactical surface, subsurface, airborne platforms, and Aegis Ashore sites into a single IP environment with gateway functions to joint and coalition networks. Technical Insertions (TI) are minor upgrades to existing system hardware and software baselines that are required to maximize Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) capability and interface functionality between ADNS and applicable programs. ADNS will also deploy a Software Defined Network (SDN) solution. SDN delivery employs an iterative approach to Ashore modernization providing increased throughput and Software Defined Networking (SDN) capability at ADNS Shore sites with the intended end goal being a Global Mesh. ADNS Shore sites vary in unit cost between the NOCs, Teleports, and Gateways based on hardware footprint. Agile Enclave (AE) will provide rapid deployment of urgently needed cybersecurity upgrades as well as increased networking capability to combat rapidly emerging cyber threats to the Fleet. Agile Enclave (AE) will be procured and installed in the same FY based on urgent Fleet need due to current cyber vulnerability. Legacy Network Cyber Resiliency/Operation Rolling Tide (ORT): ORT is a Navy-wide cyber remediation effort to secure government databases and improve the overall security protocols for Navy computer networks. Specifically, Legacy Network Cyber Resiliency/ORT will fund planned legacy network upgrades and mitigate security vulnerabilities on the highest End of Life (EOL) platforms that are not targeted to be replaced by a CANES system. These upgrades will mitigate known targeted cyber vulnerabilities and include eradication of old Windows Operating Systems, critical EOL firewalls and routers and improved anti-malware solutions. Legacy Network Cyber Resiliency/ORT will improve the networks ability to detect known and unknown vulnerabilities and attacks by upgrading sensor and monitoring technologies and accelerating post-attack containment and recovery. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 1 of 29 P-1 Line #74 Volume 2 - 689 === page 770 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Ship Communications Automation Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: N/A Piers / Enterprise Pier Connectivity Architecture (EPCA): Commander Pacific Fleet, Commander United States Naval European Command and Commander United States Naval Central Command have declared pier Information Technology (IT) infrastructure modernization to be a Force Protection matter of urgency. A fully capable and modern Enterprise pier IT infrastructure allows United States (US) Naval ships, while pier-side at 26 global locations (15 Continental United States (CONUS)/11 Outside Continental United States (OCONUS)), to secure their Radio Frequency (RF) systems for critical maintenance, perform battle force training, while continuing to send and receive operational and intelligence traffic. This element of the BLII program installs state-of-the-art, Automated Digital Network System compatible IT infrastructure to Navy operated piers worldwide, including public and commercial shipyards and authorized Department of Navy (DON) foreign ports. EPCA provides expanded Non-Classified Internet Protocol Router Network (NIPRNET)/ Secret Internet Protocol Router Network (SIPRNET) capability to piers to meet Fleet Commander stated requirements in order to maintain situational awareness related to anti-terrorist military operations. Further, it ensures bandwidth requirements are met in order to download critical security patches and updates required for ships to maintain proper Information Assurance (IA) security posture. While in port, ships are connected by either an Umbilical Cable Assembly (UCA) or a Wireless solution from the skin of the ship to the first Navy Network Operations Center (NOC). Tactical Messaging provides exchange of Joint Top Secret and below Official Information (OI) of high precedence Command and Control (C2) as well as routine organizational record message traffic between ashore sites and afloat platforms. The primary mission of Tactical Messaging is to provide a manageable messaging service gateway capability between Top Secret (TS), Secret Internet Protocol Router Network (SIPRNet), and the Non-classified Internet Protocol Router Network (NIPRNet) users. This messaging service capability includes seamless interoperability between other Department of War (DoW) messaging systems such as the Defense Information Systems Agency (DISA) Organizational Messaging Service (OMS), along with other serial-based legacy systems. Tactical Messaging provides sustainment and modernization for messaging systems on over 320 United States Navy (USN), Military Sealift Command (MSC) and United States Coast Guard (USCG) afloat platforms and 4 USN shore communications stations. The Tactical Messaging modernization effort for afloat platforms replaces the legacy, multi-rack, Naval Modular Automated Communication System (NAVMACS) with a modern, single-rack NAVMACS II system that automates and increases the speed and efficiency of handling organizational message traffic aboard ships and submarines. NAVMACS II leverages the Internet Protocol (IP) networks to send and receive organizational messages during normal operations and interfaces with non-IP serial Satellite Communication (SATCOM) and other Line of Site (LOS) and Beyond Line of Site (BLOS) Radio Frequency (RF) transmission paths to provide resilient C2 traffic during IP outages and Emission Control (EMCON) operations. C2OIX is the shore component of Tactical Messaging that handles UNCLASSIFIED, SECRET and TOP SECRET message service. C2OIX also provides an integrated Cross Domain Solution (CDS) for over 2,500 shore commands throughout the Navy shore enterprise and over 320 USN, MSC and USCG afloat platforms. C2OIX is located at the two Naval Computer Telecommunication Area Master Stations (NCTAMS PACIFIC and NCTAMS ATLANTIC) to provide worldwide coverage for shore commands. These suites also provide messaging services for satellite uplink to afloat units and Continental United States (CONUS) Areas Of Operation (AORs). Additionally, there are partial C2OIX suites located at two Naval Computer and Telecommunications Station sites (NCTS GUAM and NCTS NAPLES) to provide messaging services for satellite uplink to units operating in the Indian Ocean and Western Pacific areas of operation. Tactical Messaging satisfies shore and afloat Navy OI messaging requirements and implements products that are developed with an open system architecture that allow organizational message exchange between the Navy and other Services and Agencies. Shore Tactical Assured Command and Control (STACC) is the Navy's Program of Record (POR) charged with consolidating, replacing, and modernizing ashore Wide Area Network (WAN) services infrastructure with a cyber-hardened, warfighting resilient hardware, software, and enterprise services infrastructure - enabling information warfare from and within the tactical domain and expanding the Fleets' digital competitive advantage. Critical shore infrastructure, services, and transport provided by the POR enable naval, joint, and coalition communication afloat and ashore - allowing Commands to protect and maneuver Command and Control (C2) networks, provide assured C2 in cyber-contested environments, and deliver resilient networking for applications at the Operational Level of War (OLW). STACC services ensure Distributed Command, Control, and Communications (C3) across 10 security enclaves and are critical in the ability for forces to "Fight from the Maritime Operations Center (MOC)" in various Network Control (NETCON) conditions. STACC provides shore-based resilient tactical networking services and Command, Control, Communications, Computers, and Intelligence (C4I) capabilities to 410 afloat platforms and 93 shore commands. The program consists of a family of eight systems and 15 variants strategically positioned around the globe to provide capability to shore commands and interoperate with Consolidated Afloat Networks and Enterprise Services (CANES) and Automated Digital Network System (ADNS systems), enabling communication from seabed to space. The program has five prime mission products Virtual Secure Enclave (VSE); Fleet Network Operations Center (FLTNOC); Combined Enterprise Regional Information Exchange System-Maritime (CENTRIXS-M), Sensitive Compartmented Information (SCI), and Transport. Critical shore sites where capability is fielded, or where services are provided, include Naval Computer and Telecommunications Area Master Stations (NCTAMS), Naval Computer and Telecommunication Stations (NCTS), Broadcast Control Authority (BCA), MOC, and Commander Task Force (CTF). A large portion of the capability is at the Fleet NOCs to provide network management and situational awareness, C2 application hosting (to include Battle Management Aids (BMAs)), cybersecurity boundary protection, network gateway, and connectivity services. STACC's C4I capabilities provide the Navy's C2 connection between globally deployed tactical warfighting forces (ships, submarines, aircraft, ashore Numbered Fleet Commanders, and Coalition partners) that directly enable Distributed Maritime Operations, worldwide. The STACC network provides email, chat, Domain Name System (DNS), and patching applications to afloat platforms in a tactical environment to all deployed warfighting assets across all security classification levels enclaves (Unclassified, Secret, Secret Releasable (SEC REL) and SCI). LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 2 of 29 P-1 Line #74 Volume 2 - 690 === page 771 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Ship Communications Automation Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: N/A STACC supports Fleet Commanders and Shore C2 users by globally connecting and consolidating common services, enabling resiliency, deploying resilient C2, and proactively defending the network by separating and severing the "tactical level" network from "business" networks (e.g., Navy/Marine Corps Intranet (NMCI), OCONUS Naval Enterprise Network (ONE-NET)). The program plays an integral part in connecting "afloat" networks such as Integrated Shipboard Network Systems (ISNS)/ CANES and supports critical strategic Navy efforts (i.e., Project Overmatch (OM)). Unlike NMCI and ONE-NET, STACC is operated and managed by the military, thereby allowing for custom network controls, commercial off-the-shelf / government off-the-shelf (COTS/GOTS) solutions, increased protection for critical C2 and failover capability within a denied environment. The STACC portfolio includes: FLTNOC and SCI Network Operation Centers (NOCs) act as the hub for connecting various enclaves, including Virtual Secure Enclave (VSE) and Combined Enterprise Regional Information Exchange SystemMaritime (CENTRIXS-M) to afloat units. They provide "tactical" level networking (Internet Protocol (IP) routing, traffic management, cyber monitoring/protection, storage, and computing) and hosting for multiple critical C4I applications and collaboration tools (as validated and funded requirements dictate) leveraged by Fleet Commanders to C2 deployed forces. VSE provides a resilient C2 network (separate and severable from Tactical SIPRNet) designed to survive in a highly contested cyber environment and assure secure C2 communications between shore Fleet Command elements and deployed warfighters. VSE is a thin-client architecture residing at the NOCs that provides secure and resilient C2 network capability for specific Fleet prioritized warfighting commands (e.g., MOC, CTF, etc.) and critical C2 applications at the OLW in denied environment scenarios. VSE provides secure and resilient application hosting, transport, and authenticated role-based access for tactical operations. CENTRIXS-M ashore is a collection of Coalition Classified SECRET networks - along separate and severable paths - used for coalition (non-U.S.) interoperability in support of military operations. The STACC CENTRIXS-M connects the MOCs, Fleet units, and Expeditionary units to various foreign partner bi-lateral and multilateral coalitions (e.g., NATO). This critical element of STACC allows for collaboration and communication with coalition forces during operations. CENTRIXS-M currently exists as a web-centric, global network to provide allied and coalition partners with information services (e.g., email, web services, chat collaboration, and Common Operational Picture (COP)) using Global Command and Control System (GCCS) track data through Radiant Mercury (RM) and Command and Control Personal Computer (C2PC). It incorporates and adapts a variety of COTS hardware/ software and GOTS software to its architecture. CENTRIXS-M is a system of seven SECREL enclaves installed at the two main NOCs in the Pacific and Atlantic. Transport provides physical end-point connections from ships and submarines to the shore tactical infrastructure; ensuring the network traffic path is transparent to the operators. STACC Transport modernizes the Navy's shore legacy serial transport infrastructure into a fully IP network-centric enterprise capable of providing seamless and secure transport with increased bandwidth in support of DoW, Joint, and Coalition operations for voice, video, and data between shore facilities and the tactical community. Transport is critical for providing secure physical connectivity between shore locations. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 3 of 29 P-1 Line #74 Volume 2 - 691 === page 772 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Ship Communications Automation Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Ship Communications Automation - / 173.565 - / 6.722 P-3a 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore (TBD) P-5a - / 494.679 - / 59.583 P-3a 2 / PQ070 Shore Tactical Assured Command and Control (STACC) (TBD) - / 789.519 - / 29.859 P-3a 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) (TBD) P-40 Total Gross/Weapon System Cost - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 49.607 - / 1,507.370 - / 6.425 - / 8.820 - / 0.000 - / 8.820 - / 113.571 - / 98.699 - / 0.000 - / 98.699 - / 37.232 - / 41.741 - / 0.000 - / 41.741 / 7.345 - / 0.000 / 156.605 - / 0.000 / 7.382 - / 103.546 - / 4.847 - / 162.075 - - / 7.345 - / 156.605 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Ship Communications Automation P-3a 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore (TBD) P-5a - / 106.101 - / 111.835 - / 118.392 - / 125.111 P-3a 2 / PQ070 Shore Tactical Assured Command and Control (STACC) (TBD) - / 48.539 - / 48.284 - / 48.719 - / 47.524 P-3a 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) (TBD) - / 7.221 - / 7.239 - / 7.316 - / 5.878 P-40 Total Gross/Weapon System Cost - - / - / 172.342 - - / - / 174.794 - - / - / 182.014 - - / - / 188.225 - / - - / - Continuing Continuing Continuing Continuing Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Total decrease from FY 2026 to FY 2027 is $5.470 million. FY 2027 request supports integration of afloat assets into cloud environment, expansion of Navy Exchange Point (NXP) to integrate with joint and tactical assets, and NSA connections for distributed Signals Intelligence (SIGINT) operations and includes funding provided for the extension of twelve DDGs. In FY 2027, Automated Digital Network System (ADNS) continues integration of Assured Command and Control capabilities to meet fleet requirements as well as fielding at Ashore sites. In FY 2027, ADNS funds are for the procurement of (30) Increment (INC) III Afloat units, (14) Ashore INC III units, (108) Agile Enclave (AE) units, (25) INC III Afloat Technical Insertion (TI) units, and (7) ADNS Advanced Networking Tactical System (ANTS) technical refreshes, with integration, and associated costs for pre-installation design. Additional increase in procurements are for ADNS INC III Ashore specifically for new Software Defined Networking (SDN) upgrades. Quantities for ADNS INC III Ashore decreased from (15) in FY26 to (14) in FY27 to decrease the number of sites supported. The FY 2027 procurements in AE and ADNS Ashore INC III are installed in the same FY. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 4 of 29 P-1 Line #74 Volume 2 - 692 === page 773 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3050 / Ship Communications Automation Program Elements for Code B Items: N/A Other Related Program Elements: 0303138N Line Item MDAP/MAIS Code: N/A In FY 2027, Piers / Enterprise Pier Connectivity Architecture (EPCA) will procure (2) and install (2) EPCA units pier side to address pier Information Technology (IT) infrastructure modernization in support of Force Protection matter of urgency. Funds will support pre-installation design, site surveys, procurement of hardware and software, production support, and installation of Piers IT infrastructure. The increase in procurement and installation Area of Responsibility (AOR) quantities is based on funding realignment based on a partial restoral of the Piers budget after a reduction in FY26. In FY 2027, Tactical Messaging will procure, install and integrate (8) NAVMACS Afloat units. Funds support associated costs for pre-installation design to replace old legacy equipment onboard ships and submarines. In FY 2027, STACC increase supports Fight from the MOC (FFTM) Resilient Cloud (IL6). Funding supports the expansion of compute, storage, processing, and transport via IL6 cloud architecture in support of providing resilient network services to tactical platforms, afloat and ashore, inclusive of Maritime Operation Centers (MOCs). Integration funding supports the STACC system of systems (SoS) modernization of COTS end of life/end of support equipment addressing critical upgrades for obsolescent components within the STACC equipment baseline reducing cybersecurity vulnerabilities, maintainability, and interoperability risks for crucial RC3 capabilities. Cyber Threat Upgrade (CTU) funding increases VSE capacity to support afloat CTU requirements to include hosting of key applications. In FY 2027, STACC will procure, install, and integrate eleven (11) STACC equipment upgrades to: transition legacy serial transport to an IP environment; expand IP services (UNCLASSIFIED, SECRET, CENTRIXS-M, and SCI) to include application hosting services and expanded storage capability and network responsiveness of the central infrastructure needed to align with increased number of users and demand of supported systems; and enhance Network Operations monitoring and management, provide cyber remediation solutions to detect, deter and mitigate network threats and for Assured Command and Control to support terrestrial communications and routing changes. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 5 of 29 P-1 Line #74 Volume 2 - 693 === page 774 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Communications Automation MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 6.722 6.425 8.820 0.000 8.820 - Gross/Weapon System Cost ($ in Millions) 173.565 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 173.565 Plus CY Advance Procurement ($ in Millions) - - - - - 6.722 6.425 8.820 0.000 8.820 - Total Obligation Authority ($ in Millions) 173.565 FY 2027 Total - - - - - 6.722 6.425 8.820 0.000 8.820 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - Consolidated Prior Year Requirements - Tactical Messaging Cost Recurring Cost 1.1.1) TacMsg Consolidated Prior Year Requirements (1) Subtotal: Recurring Cost Subtotal: Hardware Consolidated Prior Year Requirements - Tactical Messaging Cost - - 97.915 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 97.915 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 97.915 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.653 - - 0.000 Hardware Cost Recurring Cost 2.1.1) ADNS Advanced Networking Tactical System 357.000 2 0.714 355.143 7 2.486 371.429 7 2.600 379.000 7 379.000 7 2.653 100.600 40 4.024 106.000 4 0.424 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 4.738 - - 2.910 - - 2.600 - - 2.653 - - 0.000 - - 2.653 - - 4.738 - - 2.910 - - 2.600 - - 2.653 - - 0.000 - - 2.653 (†) (2) (ANTS) 2.1.2) Automated Digital Network System (ADNS) - (†) Ashore - INC I&II Subtotal: Recurring Cost Subtotal: Hardware Cost Hardware - Tactical Messaging Cost Recurring Cost LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 6 of 29 P-1 Line #74 Volume 2 - 694 === page 775 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Communications Automation MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements 3.1.1) NAVMACS Equipment (Afloat) ($ K) (†) (3) Qty (Each) 138.285 FY 2025 Total Cost ($ M) 193 26.689 Unit Cost ($ K) 183.333 FY 2026 Total Cost Qty (Each) ($ M) 10 1.833 Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) 165.000 8 1.320 Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) 200.000 8 Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) 1.600 - - 0.000 Unit Cost ($ K) Total Cost Qty (Each) ($ M) 200.000 8 1.600 Subtotal: Recurring Cost - - 26.689 - - 1.833 - - 1.320 - - 1.600 - - 0.000 - - 1.600 Subtotal: Hardware - Tactical Messaging Cost - - 26.689 - - 1.833 - - 1.320 - - 1.600 - - 0.000 - - 1.600 193 20.928 10 1.629 4.224 - - 0.000 - - 20.928 - - 1.629 - - 2.200 - - 4.224 - - 0.000 - - 4.224 - - 20.928 - - 1.629 - - 2.200 - - 4.224 - - 0.000 - - 4.224 Hardware - Installations - Tactical Messaging Cost Recurring Cost 4.1.1) NAVMACS (†) (4) Installs (Afloat) Subtotal: Recurring Cost Subtotal: Hardware Installations - Tactical Messaging Cost 108.435 162.900 275.000 8 2.200 528.000 8 528.000 8 4.224 Hardware - Consolidated Prior Year Requirements - ADNS Cost Non Recurring Cost 5.1.1) ADNS ANTS Non-Recurring Engineering - - 1.843 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 1.843 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware Consolidated Prior Year Requirements - ADNS Cost - - 1.843 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Support - Production Support - Tactical Messaging Cost 6.1) Production Support Tactical Messaging 6.2) DSA Tactical - - 9.462 - - 0.111 - - 0.065 - - 0.088 - - 0.000 - - 0.088 (5) - - 11.990 - - 0.239 - - 0.240 - - 0.255 - - 0.000 - - 0.255 Subtotal: Support Production Support - Tactical Messaging Cost - - 21.452 - - 0.350 - - 0.305 - - 0.343 - - 0.000 - - 0.343 Gross/Weapon System Cost - - 173.565 - - 6.722 - - 6.425 - - 8.820 - - 0.000 - - 8.820 Messaging (†) indicates the presence of a P-5a Footnotes: (1) Prior year total costs represent a total of 240 units procured and installed in prior years. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 7 of 29 P-1 Line #74 Volume 2 - 695 === page 776 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Communications Automation MDAP/MAIS Code: (2) FY27 Funding continues to provide critical system software (U-SB4) and hardware (HB2.2) Tech Refresh upgrades, which will support MQ-25 squadron deployments. This effort also includes a system transition to an SDN implementation aligned with overarching RC3 requirements. This effort will provide critical flight safety, air vehicle Command and Control (C2), and mission payload transport systems upgrades in support of deploying MQ-25 squadrons. Quantities represented in this budget are aligned to the number of aircraft to receive tech refresh upgrades and do not represent full system procurements. ANTS upgrades the traditional ADNS Inc. III baseline on Aircraft and is not a new start. (3) (4) (5) Procurement quantities represent multiple system variants with varying unit costs. Install quantities represent multiple system variants with varying installation costs. Additional DSA required due to upgrades of ship designs and new hull requirements LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 8 of 29 P-1 Line #74 Volume 2 - 696 === page 777 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 Cost Elements O O C P-1 Line Item Number / Title: 3050 / Ship Communications Automation Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Ship Communications Automation Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2.1.1) ADNS Advanced Networking Tactical System (ANTS) 2025 Naval Information Warfare Center Pacific (NIWC PAC) / San Diego, CA C / CPFF San Diego, CA Nov 2024 Sep 2025 7 355.143 Y 2.1.1) ADNS Advanced Networking Tactical System (ANTS) 2026 Naval Information Warfare Center Pacific (NIWC PAC) / San Diego, CA C / CPFF San Diego, CA Nov 2025 Sep 2026 7 371.429 Y 2.1.1) ADNS Advanced Networking Tactical System (ANTS) 2027 Naval Information Warfare Center Pacific (NIWC PAC) / San Diego, CA C / CPFF San Diego, CA Nov 2026 Sep 2027 7 379.000 Y 2.1.2) Automated Digital Network System (ADNS) - Ashore - INC I&II 2025 C / IDDQ NAVWAR Nov 2024 Mar 2025 4 106.000 Y 3.1.1) NAVMACS Equipment (Afloat) 2025 NIWC LANT / Charleston, SC C / IDIQ charleston, sc Nov 2024 Dec 2024 10 183.333 Y 3.1.1) NAVMACS Equipment (Afloat) 2026 NIWC LANT / Charleston, SC C / IDIQ charleston, sc Nov 2025 Dec 2025 8 165.000 Y 3.1.1) NAVMACS Equipment (Afloat) 2027 NIWC LANT / Charleston, SC C / IDIQ charleston, sc Nov 2026 Dec 2026 8 200.000 Y 2025 Naval Information Warfare Center / Various WR charleston, sc Nov 2024 Nov 2024 10 162.900 Y 2026 Naval Information Warfare Center / Various WR charleston, sc Nov 2025 Nov 2025 8 275.000 Y 2027 Naval Information Warfare Center / Various WR Charleston, CA Nov 2026 Nov 2026 8 528.000 Y 4.1.1) NAVMACS Installs (Afloat) 4.1.1) NAVMACS Installs (Afloat) 4.1.1) NAVMACS Installs (Afloat) Naval Information Warfare Center (NIWC) (6) / San Diego, CA (Each) RFP Issue Date Footnotes: (6) Naval Information Warfare Center (NIWC) Pacific (PAC) is the procuring agency for Automated Digital Network Systems (ADNS) Ashore components and leverages multiple contract vehicles with various vendors. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 9 of 29 P-1 Line #74 Volume 2 - 697 === page 778 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Prior Years 494.679 494.679 494.679 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 98.699 0.000 98.699 59.583 59.583 59.583 113.571 113.571 113.571 - - - 98.699 0.000 98.699 - - - 98.699 0.000 98.699 106.101 106.101 106.101 111.835 111.835 111.835 118.392 118.392 118.392 To FY 2031 Complete 125.111 Continuing 125.111 - Total - Continuing Continuing Continuing - - 125.111 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Automated Digital Network System (ADNS) is the gateway to the tactical Wide Area Network (WAN) afloat for Internet Protocol (IP) network operations, supporting information dissemination and external connectivity. ADNS allows services and applications to interconnect to the Defense Information Systems Network (DISN) ashore via multiple Radio Frequency (RF) resources and pier connectivity. ADNS provides the only Quality and Class of Service (QoS/CoS) routing for Multi-Service Voice, Video, and Data domains across available Radio Frequency (RF) paths. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 10 of 29 P-1 Line #74 Volume 2 - 698 === page 779 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0204163N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore B Kits Recurring 1.1.1) Automated Digital Network System (ADNS) Afloat- INC III - NonOrganic (7) 307 / 279.159 36 / 34.461 30 / 29.266 30 / 29.881 - / - 30 / 29.881 31 / 31.493 33 / 34.195 34 / 35.934 36 / 38.810 Continuing Continuing 6 / 1.951 6 / 1.990 15 / 5.074 14 / 4.830 - / - 14 / 4.830 19 / 6.689 22 / 7.895 26 / 9.511 26 / 9.710 Continuing Continuing - 2 / 1.500 125 / 40.618 108 / 27.680 - / - 108 / 27.680 105 / 30.409 104 / 30.807 105 / 31.812 105 / 32.911 Continuing Continuing 25 / 2.670 - / - 26 / 3.006 Continuing Continuing / 65.061 - / - - / 84.437 Continuing Continuing 177 / 65.061 - / - 177 / 65.061 193 / 84.437 Continuing Continuing / 65.061 - / - - / 84.437 Continuing Continuing 1.1.2) Automated Digital Network System (ADNS) Ashore INC III - NonOrganic (8) 1.1.3) Agile Enclave (AE) - NonOrganic (9) 1.1.4) ADNS Tech Insertions - NonOrganic (10) Subtotal: Recurring 365 / 47.917 / 329.027 - Subtotal: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore Subtotal: Procurement, All Modification Items / - 678 / 329.027 / 329.027 - 26 / 2.669 / 40.620 - 70 / 40.620 / 40.620 - 24 / 2.513 / 77.471 - 194 / 77.471 / 77.471 - - - 25 / 2.670 / 65.061 / 65.061 23 / 2.506 / 71.097 - 178 / 71.097 / 71.097 - 24 / 2.667 / 75.564 - 183 / 75.564 / 75.564 - 25 / 2.834 / 80.091 - 190 / 80.091 / 80.091 - - - Support (All Modification Items) 2.1) ADNS - Production Support 2.2) ADNS - DSA (11) 2.3) Agile Enclave Production Support - / 15.281 - / 1.933 - / 3.624 - / 3.047 - / 0.000 - / 3.047 - / 3.439 - / 3.440 - / 3.555 - / 3.884 Continuing Continuing - / 20.802 - / 2.479 - / 3.752 - / 3.707 - / 0.000 - / 3.707 - / 3.651 - / 3.962 - / 4.277 - / 4.981 Continuing Continuing / 0.000 - / 0.000 - / 0.000 - / 1.506 - / 0.000 - / 1.506 - / 1.594 - / 1.773 - / 1.710 - / 1.661 / 36.083 - / 4.412 - / 7.376 - / 8.260 / - - / 8.260 - / 8.684 - / 9.175 - / 9.542 - / 10.526 Continuing Continuing - (12) Subtotal: Support - - - / - - / 8.244 Installation Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore - / 129.569 - / 14.551 - / 28.724 - / 25.378 Subtotal: Installation - / 129.569 - / 14.551 - / 28.724 - / 25.378 - / 0.000 - / 25.378 - / 26.320 - / 27.096 - / 28.759 - / 30.148 Continuing Continuing / - - / 25.378 - / 26.320 - / 27.096 - / 28.759 - / 30.148 Continuing Continuing 125.111 Continuing Continuing - Total Total Cost (Procurement + Support + Installation) LI 3050 - Ship Communications Automation Navy 494.679 59.583 113.571 98.699 0.000 UNCLASSIFIED Page 11 of 29 98.699 106.101 111.835 P-1 Line #74 118.392 Volume 2 - 699 === page 780 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore Manufacturer Information Manufacturer Name: Naval Informaiton Warfare Center (NIWC) -- San Diego, CA (Afloat ADNS Technical Manufacturer Location: San Diego, CA Insertion) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 1 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Manufacturer Name: VARIOUS (Afloat ADNS Inc III) Manufacturer Location: VARIOUS (13) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 7 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Manufacturer Name: Various Agile Enclave Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Manufacturer Name: VARIOUS (Ashore ADNS Inc III) Manufacturer Location: VARIOUS (14) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 7 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Automated Digital Network System (ADNS) - Afloat- INC III Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 273 / 104.502 34 / 10.977 - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 307 / 115.479 FY 2025 - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 36 / 11.855 Installation Cost / - LI 3050 - Ship Communications Automation Navy - / - / - 36 / 11.855 UNCLASSIFIED Page 12 of 29 P-1 Line #74 Volume 2 - 700 === page 781 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore Installation Information Method of Implementation: [none specified]:: Installation Name: Automated Digital Network System (ADNS) - Afloat- INC III Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2026 - / - - / - - / - 30 / 10.077 0 / 0.000 30 / 10.077 - - / - - / - - / - 0 / 0.000 30 / 10.077 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 30 / 10.619 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 31 / 10.832 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost Total 273 / 104.502 34 / 10.977 36 / 11.855 30 / 10.077 0 / 0.000 / - 30 / 10.619 30 / 10.077 31 / 10.832 30 / 10.619 33 / 11.406 31 / 10.832 34 / 12.362 33 / 11.406 33 / 11.406 Continuing Continuing Continuing Continuing 0 / 0.000 34 / 12.362 Continuing - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 273 9 8 9 8 9 11 10 6 8 8 7 7 8 8 7 7 8 8 8 7 9 8 8 8 9 9 8 8 36 537 Out 266 10 7 8 9 10 9 10 10 4 8 8 7 7 8 8 7 7 8 8 8 7 9 8 8 8 9 9 8 44 537 Method of Implementation: [none specified]:: Installation Name: Automated Digital Network System (ADNS) - Ashore INC III Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 6 / 0.648 Prior Years 6 / 0.648 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - 6 / 0.661 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.661 FY 2026 - / - - / - 15 / 1.685 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 1.685 FY 2027 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 1.603 FY 2028 - / - - / - - / - - / - - / - - / - 19 / 2.218 - / - - / - - / - 0 / 0.000 19 / 2.218 FY 2029 - / - - / - - / - - / - - / - - / - - / - 22 / 2.622 - / - - / - 0 / 0.000 22 / 2.622 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 26 / 3.162 - / - 0 / 0.000 26 / 3.162 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 3.226 0 / 0.000 26 / 3.226 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 6 / 0.648 LI 3050 - Ship Communications Automation Navy 6 / 0.661 15 / 1.685 14 / 1.603 14 / 1.603 0 / 0.000 0 / 0.000 UNCLASSIFIED Page 13 of 29 14 / 1.603 14 / 1.603 19 / 2.218 22 / 2.622 P-1 Line #74 26 / 3.162 - / - 26 / 3.226 - / - 0 / 0.000 - / - 134 / 15.825 Volume 2 - 701 === page 782 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore Installation Information Method of Implementation: [none specified]:: Installation Name: Automated Digital Network System (ADNS) - Ashore INC III Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - - 3 3 - - 8 7 - - 7 7 - - 10 9 - - 11 11 - - 13 13 - - 13 13 - 134 Out 3 - - 10 - - 11 11 - - 13 13 - - 13 13 134 3 - - 3 3 - - 8 7 - - 7 7 9 Method of Implementation: ADNS:: Installation Name: Agile Enclave (AE) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 2 / 1.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.000 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 125 / 13.382 FY 2027 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 108 / 11.784 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 105 / 11.687 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 104 / 11.810 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 105 / 12.160 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 2 / 1.000 125 / 13.382 108 / 11.784 125 / 13.382 0 / 0.000 108 / 11.784 108 / 11.784 0 / 0.000 105 / 11.687 108 / 11.784 104 / 11.810 105 / 11.687 105 / 12.160 104 / 11.810 105 / 12.405 - 105 / 12.160 / - 105 / 12.405 / - 0 / 0.000 - / - 105 / 12.405 Continuing Continuing Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In - - 1 1 - - 50 50 25 - 40 38 30 - 40 40 25 - 40 40 24 - 40 40 25 - 40 40 25 Cont. Cont. Out - - - - 50 50 25 - 40 38 30 - 40 40 25 - 40 40 24 - 40 40 25 - 40 40 Cont. Cont. - 1 1 LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 14 of 29 P-1 Line #74 Q4 TC Tot Volume 2 - 702 === page 783 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Modification Item 1 of 1: PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore Installation Information Method of Implementation: [none specified]:: Installation Name: ADNS Tech Insertions Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 365 / 24.419 26 / 1.913 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 26 / 1.913 24 / 1.802 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 24 / 1.802 25 / 1.914 - / - - / - - / - - / - 0 / 0.000 25 / 1.914 23 / 1.796 - / - - / - - / - 0 / 0.000 23 / 1.796 24 / 1.832 - / - - / - 0 / 0.000 24 / 1.832 25 / 2.031 - / - 0 / 0.000 25 / 2.031 26 / 2.155 0 / 0.000 Prior Years 365 / 24.419 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 365 / 24.419 26 / 1.913 25 / 1.914 24 / 1.802 0 / 0.000 25 / 1.914 0 / 0.000 25 / 1.914 23 / 1.796 24 / 1.832 - 25 / 2.031 26 / 2.155 / - Continuing Continuing 26 / 2.155 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 365 - 10 10 6 - 8 9 7 - 9 8 8 - 9 8 6 - 8 8 8 - 10 11 4 - 11 11 4 Cont. Cont. Out 348 17 6 6 7 8 8 5 7 7 6 7 7 5 6 7 6 - 9 9 - 9 9 Cont. Cont. 7 3 5 4 5 7 Q4 TC Tot Footnotes: (7) Automated Digital Network System (ADNS) Increment (INC) III Afloat procurement cost range: $.8M - $1.1M; installation cost range: $.3M - $0.5M. Average unit cost fluctuations for procurement and installation are due to varying system configurations required for surface and submarine platforms. INC III units require 4 months integration, assembly, testing and shipping after delivery, prior to installation start. Installs do not begin until 12 months after procurement is initiated (1 month administrative lead time + 7 months production lead time + 4 months integration). FY 2027 procurements will be installed in FY 2028. (8) Automated Digital Network System (ADNS) Ashore INC III : FY27-31 procurement quantities represent minor and major tech refreshes at all Ashore sites globally including but not limited to Broadcast Control Authority (BCA)'s and Naval Operational Centers (NOCs). INC III SDN consists of an Iterative approach to Shore modernization providing increased throughput and Software Defined Networking (SDN) capability at ADNS Shore sites with the intended end goal being a Global Mesh. ADNS Shore sites vary in unit cost between the NOCs, Teleports, and Gateways based on hardware footprint. (9) In FY27, (119) (AE) units are planned for rapid procurement and deployment of (AE) capabilities across Naval platforms based on urgent and emerging Fleet needs. (AE) delivers capabilities in accordance with Joint Department of War priorities supporting real world operations. Additional details on (AE) efforts are provided at a higher classification. Funding for Agile Enclave (AE) will provide rapid deployment of urgently needed cybersecurity upgrades as well as increased networking capability to combat rapidly emerging cyber threats to the Fleet. Agile Enclave (AE) will be procured and installed in the same FY based on urgent Fleet need due to current cyber vulnerability. (10) ADNS Technical Insertions (TI) will be fielded to include hardware and software baseline updates to Afloat units required to maximize Command, Control, Communications, Computer, Intelligence, and Reconnaissance (C4ISR) capability and interface functionality between Automated Digital Network System (ADNS) and applicable Satellite Communications (SATCOM) systems such as Navy Multi-Band LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 15 of 29 P-1 Line #74 Volume 2 - 703 === page 784 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PQ069 Automated Digital Network System (ADNS) - Afloat/Ashore MDAP/MAIS Code: Terminal(NMT), Global Broadcast System (GBS) and Battle Force Tactical Network (BFTN). TI unit cost includes production engineering/integration requirements associated with the initial fielding of TI capability. TI(s) require (1) month administrative lead time and (1) month production lead time. (11) Design Service Allocation (DSA) costs per unit fluctuates based on the type of platform (submarine vs Multi-purpose Aircraft Carrier, Nuclear -Propulsion (CVN)) and the type of system (Backfit vs new install) and can vary between $15K -$200K. DSA funding increase in FY2026-FY2031 is based on the increase in HW procurement and installation for Agile Enclave (AE). AE is procured and installed in the same Fiscal Year (FY). (12) (13) FY27 production direct support costs including production testing, quality assurance, production engineering, and equipment assembly include support costs related to Agile Enclave procurements. ADNS: Full Production Contract has 4 possible vendors on Multiple Award Contract (MAC) award: SERCO, Inc, Science Applciations International Corporation (SAIC), DRS Laurel Technologies, and Leidos. Contract will be used for Increment III production units. (14) ADNS: Full Production Contract has 4 possible vendors on Multiple Award Contract (MAC) award: SERCO, Inc, Science Applciations International Corporation (SAIC), DRS Laurel Technologies, and Leidos. Contract will be used for Increment III production units. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 16 of 29 P-1 Line #74 Volume 2 - 704 === page 785 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Prior Years 789.519 789.519 789.519 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 29.859 37.232 41.741 0.000 41.741 48.539 48.284 48.719 - - - - - - - - 29.859 37.232 41.741 0.000 41.741 48.539 48.284 48.719 - - - - - - - - 29.859 37.232 41.741 0.000 41.741 48.539 48.284 48.719 To FY 2031 Complete 47.524 Continuing - Continuing - 47.524 Continuing - Total - Continuing - - 47.524 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: STACC supports Fleet Commanders and Shore C2 users by globally connecting and consolidating common services, enabling resiliency, deploying resilient C2, and proactive network defense through separate and severable "tactical level" network from the "business" networks (Navy/Marine Corps Intranet (NMCI), OCONUS Naval Enterprise Network (ONE-NET)) connecting "afloat" networks such as Integrated Shipboard Network Systems (ISNS) and Consolidated Afloat Networks Enterprise Services (CANES). These critical network services are provided across 10 security enclaves and are critical in the ability for forces to "Fight from the MOC" in multiple network control (NETCON) conditions. Unlike NMCI and ONE-NET, STACC is operated and managed by the military allowing for custom network controls, commercial off-the-shelf/government off-the-shelf (COTS/GOTS) solutions, increased protection for critical C2 and failover capability within a denied environment. STACC provides and maintains several infrastructure systems essential for the entire Fleet to communicate end-to-end by providing a gateway for the tactical communities by incorporating the latest technologies into an integrated portfolio of products and services that facilitate effective C2 across the force. [Equipment - STACC] Each quantity represents a single STACC Equipment modernization/capability upgrade to a specific site. The cost of each individual modernization effort varies depending on the complexity of modernization required to mitigate cyber security threats, keep pace with increased computing requirements for hosted applications, and support Department of WAR (DoW) directives to remove End of Life (EOL) Windows Operating Systems software as quickly as feasible. Procurements could include refresh of routers, switches, servers, workstations, multi-level thin clients, firewalls across the five security enclaves or be as complex as a complete network refresh. There are over 3,900 different STACC devices fielded at over 93 sites across the globe. Installations can include routers, switches, servers, workstations, multi-level thin clients, firewalls across the five security enclaves. [Fight from the MOC (FFTM) Resilient Cloud (IL6)] Funding supports the expansion of compute, storage, processing, and transport via IL6 cloud architecture in support of providing resilient network services to tactical platforms, afloat and ashore, inclusive of Maritime Operation Centers (MOCs). Investment will expand and operationalize cloud access points for hosting of critical services for Tactical Platform users at operational commands, including 6 MOC instantiations and ensure warfighter access to key services in support of Fight from the MOC, enabling execution of Combatant Command operations. Cloud architecture will adhere to Navy-defined strategy inclusive of key cybersecurity principles (ex: zero trust) and provides the critical operational capability to enable Resilient Command, Control, and Communications (RC3) per Senior-level priorities such as SECWAR Relook, CNO NAVPLAN, and Fight from the MOC. [STACC Integration] Funding supports the STACC system of systems (SoS) modernization of COTS end of life/end of support equipment. Funding addresses an expanded scope of concurrent, critical upgrades for obsolescent components within the STACC equipment baseline reducing cybersecurity vulnerabilities, maintainability, and interoperability risks for crucial RC3 capabilities. Integration will supplement the PORs current installation schedule. There are over 3,900 different STACC devices fielded at over 93 sites across the globe. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 17 of 29 P-1 Line #74 Volume 2 - 705 === page 786 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) B Kits Recurring 1.1.1) Consolidated Prior Year Requirements - Organic 12 / 47.885 - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - 2 / 7.106 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 7.214 1 / 0.159 - / - - / - - / - - / - - / - - / - - / - - / - 21 / 6.283 - / - - / - - / - - / - - / - - / - - / - - / - 11 / 1.739 - / - - / - - / - - / - 167 / 369.651 12 / 15.081 1.1.3) VSE Expansion - ASP Infrastructure NonOrganic 1 / 3.500 1 / 3.606 - / - - 1.1.4) VSE Expansion - CENTRIXS-M NOC Infrastructure - NonOrganic 1 / 3.500 - / - 1 / 3.714 1.1.5) VSE Expansion - CTF VSE/CENTRIXS-M Procurement - NonOrganic 13 / 3.947 7 / 2.177 1.1.2) Equipment - STACC - NonOrganic 13 / 16.245 - (15) / - 11 / 14.078 - / - 11 / 14.078 - / - 16 / 20.737 1.1.6) VSE Expansion - CTF VSE Procurement NonOrganic - / - - / - 11 / 1.739 (16) - / - 1 / 1.800 1 / 1.500 1 / 1.500 - / - 1 / 1.500 1 / 1.500 - / - - - 1 / 14.305 - / - 1 / 14.305 1 / 14.993 1.1.7) VSE - Cyber Threat Upgrade - Organic 1.1.8) Fight from the MOC (FFTM) Resilient Cloud (IL6) - Organic (17) Subtotal: Recurring Subtotal: PQ070 Shore Tactical Assured Command and Control (STACC) Subtotal: Procurement, All Modification Items / 428.483 - 194 / 428.483 / 428.483 - / - / 22.664 - 21 / 22.664 / 22.664 - / - / 23.357 - 27 / 23.357 / 23.357 - / 29.883 - / - - 13 / 29.883 - / - 13 / 29.883 / 29.883 - / - - - - / 29.883 / 29.883 / 37.230 - 18 / 37.230 / 37.230 - - / - 17 / 22.248 - 1 / 14.812 / 37.060 - 18 / 37.060 / 37.060 - / - 17 / 22.689 - 1 / 14.813 / 37.502 - 18 / 37.502 / 37.502 - / - 17 / 22.792 - / - Continuing 12 / 47.885 Continuing 4 / 6.300 1 / 14.885 Continuing Continuing / 37.677 Continuing Continuing 18 / 37.677 Continuing Continuing / 37.677 Continuing Continuing - - Support (All Modification Items) 2.1) STACC Production Support 2.2) STACC Integration - / 30.250 - (18) - / - - / 0.915 - / 0.969 - / 0.699 - / - - / 0.699 - / 1.031 - / 1.107 - / 1.129 - / 1.134 Continuing Continuing / - - / 4.543 - / 7.375 - / - - / 7.375 - / 6.074 - / 5.652 - / 5.473 - / 4.006 Continuing Continuing - / 1.478 - / - - / 1.478 - / 1.592 - / 1.635 - / 1.728 - / 1.762 Continuing Continuing / - - / - - / - - / 9.552 - / 8.697 - / 8.394 - / 8.330 - / 6.902 Continuing Continuing / 0.000 - / 2.306 - / 2.612 - / 2.830 - / 2.887 - / 2.945 Continuing Continuing / - - / 2.306 - / 2.612 - / 2.830 - / 2.887 - / 2.945 Continuing Continuing (19) - / 3.332 - / 2.252 - / 1.351 2.4) VSE Expansion - Production Support - / 0.619 - / 0.351 - / 0.337 / 34.201 - / 3.518 - / 7.200 - / 9.552 2.3) STACC DSA Subtotal: Support - - - / - - / - - / - - / - - / - - / - - / 1.307 Installation Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) - / 326.835 - / 3.677 - / 6.675 - / 2.306 Subtotal: Installation - / 326.835 - / 3.677 - / 6.675 - / 2.306 LI 3050 - Ship Communications Automation Navy - UNCLASSIFIED Page 18 of 29 P-1 Line #74 Volume 2 - 706 === page 787 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) LI 3050 - Ship Communications Automation Navy 789.519 29.859 37.232 41.741 0.000 UNCLASSIFIED Page 19 of 29 41.741 48.539 48.284 P-1 Line #74 48.719 47.524 Continuing Continuing Volume 2 - 707 === page 788 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) Manufacturer Information Manufacturer Name: NIWC LANT (REIM/DC) Manufacturer Location: Charleston, SC (20) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 Contract Dates Nov 2024 Nov 2025 Nov 2026 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Manufacturer Name: Multiple Vendors (STACC Equipment) FY 2028 FY 2030 FY 2031 Manufacturer Location: Various (21) Administrative Leadtime (in Months): 1 Dates FY 2029 Production Leadtime (in Months): 2 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment - STACC Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 162 / 322.550 5 / 0.637 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 167 / 323.187 FY 2025 - / - 7 / 0.891 5 / 0.680 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 1.571 FY 2026 - / - - / - 8 / 1.051 5 / 0.000 0 / 0.000 5 / 0.000 - / - - / - - / - - / - 0 / 0.000 13 / 1.051 FY 2027 - / - - / - - / - 11 / 1.770 0 / 0.000 11 / 1.770 - / - - / - - / - - / - 0 / 0.000 11 / 1.770 FY 2028 - / - - / - - / - - / - - / - - / - 16 / 2.612 - / - - / - - / - 0 / 0.000 16 / 2.612 FY 2029 - / - - / - - / - - / - - / - - / - - / - 17 / 2.830 - / - - / - 0 / 0.000 17 / 2.830 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 17 / 2.887 - / - 0 / 0.000 17 / 2.887 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 2.945 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost Total 162 / 322.550 LI 3050 - Ship Communications Automation Navy 12 / 1.528 13 / 1.731 16 / 1.770 0 / 0.000 UNCLASSIFIED Page 20 of 29 16 / 1.770 16 / 2.612 17 / 2.830 P-1 Line #74 17 / 2.887 - 17 / 2.945 / - Continuing Continuing 17 / 2.945 Continuing Continuing Volume 2 - 708 === page 789 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) Installation Information Method of Implementation: [none specified]:: Installation Name: Equipment - STACC Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 162 5 - 3 4 5 2 3 3 5 5 5 1 - 7 6 3 - 6 8 3 - 6 8 3 - 6 8 3 Cont. Cont. Out 161 3 3 3 3 5 3 3 5 5 5 1 - 7 6 3 - 6 8 3 - 6 8 3 - 6 8 3 Cont. Cont. 3 Q4 TC Tot Method of Implementation: Shore:: Installation Name: VSE Expansion - ASP Infrastructure Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.765 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.765 FY 2025 - / - - / - 1 / 0.765 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.765 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.765 - / - 1 / 0.765 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.530 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 2 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - 1 LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 21 of 29 P-1 Line #74 Volume 2 - 709 === page 790 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) Installation Information Method of Implementation: Shore:: Installation Name: VSE Expansion - CENTRIXS-M NOC Infrastructure Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 1 / 0.510 Prior Years 1 / 0.510 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - - / - 1 / 0.536 0 / 0.000 1 / 0.536 - / - - / - - / - - / - 0 / 0.000 1 / 0.536 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.510 - / - - / - 1 / 0.536 1 / 0.536 - / - - / - - / - - / - 0 / 0.000 0 / 0.000 / - - / - 2 / 1.046 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - 2 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - 1 Method of Implementation: Shore:: Installation Name: VSE Expansion - CTF VSE/CENTRIXS-M Procurement Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 3.010 3 / 0.921 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 13 / 3.931 FY 2025 - / - 4 / 1.228 3 / 0.948 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 2.176 FY 2026 - / - - / - 1 / 0.316 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.316 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 22 of 29 P-1 Line #74 Volume 2 - 710 === page 791 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) Installation Information Method of Implementation: Shore:: Installation Name: VSE Expansion - CTF VSE/CENTRIXS-M Procurement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - 4 / 1.264 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 To Complete - Total / - - 10 / 3.010 / - 7 / 2.149 / - - / - 21 / 6.423 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 3 - 2 2 3 - - 1 - - - - - - - - - - - - - - - - - - - - - 21 Out 8 3 1 2 2 - - - - - - - - - - - - - - - - - - - - 21 2 2 - - 1 Method of Implementation: [none specified]:: Installation Name: VSE Expansion - CTF VSE Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 11 / 2.915 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 11 / 2.915 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 23 of 29 P-1 Line #74 11 / 2.915 11 / 2.915 Volume 2 - 711 === page 792 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: Modification Item 1 of 1: PQ070 Shore Tactical Assured Command and Control (STACC) Installation Information Method of Implementation: [none specified]:: Installation Name: VSE Expansion - CTF VSE Procurement Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 5 6 - - - - - - - - - - - - - - - - - - - - - 11 Out - - - - - - - 3 4 - - - - - - - - - - - - - - - - - - - - 11 4 Method of Implementation (Organic): Consolidated Prior Year Requirements - Not Installed Installation Quantity: 12 Method of Implementation (Organic): VSE - Cyber Threat Upgrade - Not Installed Installation Quantity: 4 Method of Implementation (Organic): Fight from the MOC (FFTM) Resilient Cloud (IL6) - Not Installed Installation Quantity: 0 Footnotes: (15) In FY 2027, eleven (11) procurements will be installed over 12 months. Each quantity represents a single STACC Equipment modernization/capability upgrade to a specific site. The cost of each individual modernization effort varies depending on the complexity of modernization required to mitigate cyber security threats, keep pace with increased computing requirements for hosted applications, and support Department of War (DoW) directives to remove End of Life (EOL) Windows Operating Systems software as quickly as feasible. Procurements could include refresh of routers, switches, servers, workstations, multi-level thin clients, firewalls across the five security enclaves or be as complex as a complete network refresh. There are over 3,900 different STACC devices fielded at over 93 sites across the globe. Install quantities represent multiple system variants with varying costs and can include routers, switches, servers, workstations, multi-level thin clients, firewalls across the five security enclaves. (16) FY 2027 funding is in support of the Cyber Threat Update (CTU). An increase to VSE capacity, licenses, and sustainment is necessary in order to support afloat CTU requirements. To include application hosting of key apps. VSE required to increase the capacity of the ASP in order to support critical C2 applications afloat. Requirements reference: PACFLT/FFC Joint Resilient Command and Control Requirements DTG 292215ZSEP17. (17) FY 2027 funding supports the expansion of compute, storage, processing, and transport via IL6 cloud architecture in support of providing resilient network services to tactical platforms, afloat and ashore, inclusive of Maritime Operation Centers (MOCs). Investment will expand and operationalize cloud access points for hosting of critical services for Tactical Platform users at operational commands, including 6 MOC instantiations and ensure warfighter access to key services in support of Fight from the MOC, enabling execution of Combatant Command operations. This will establish STACC Secret core services hosting capability, providing the environment and scalability for MOC-utilized applications. Cloud services will be awarded through competitive IDIQ contracts, utilizing a consumption-based procurement model (Software-as-a-Service (SaaS), Infrastructure-as-a-Service (IaaS), Platform-as-a-Service (PaaS)), to include hosting fees, system administration, operations, and licensing fees. Transport investment procurement packages include upgrading routers, switches, workstations, multi-level clients, and firewalls across multiple security enclaves to deliver high speed connectivity across multiple transport paths (details at higher classification). Funding will provide integration into software defined networking (SDN) architecture for MOC Continuity of Operations (COOP) resiliency across hosted applications leveraging commercial cloud diversity/investment and augment the hosting footprint for fixed Navy shore sites. Cloud architecture will adhere to Navy-defined strategy inclusive of key cybersecurity principles (ex: zero trust) and provides the critical operational capability to enable Resilient Command, Control, and Communications (RC3) per Senior-level priorities such as SECWAR Relook, CNO NAVPLAN, and Fight from the MOC. (18) FY 2027 funding supports the STACC system of systems (SoS) modernization of COTS end of life/end of support equipment. Funding addresses an expanded scope of concurrent, critical upgrades for obsolescent components within the STACC equipment baseline reducing cybersecurity vulnerabilities, maintainability, and interoperability risks for crucial RC3 capabilities. Integration will supplement the PORs LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 24 of 29 P-1 Line #74 Volume 2 - 712 === page 793 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PQ070 Shore Tactical Assured Command and Control (STACC) MDAP/MAIS Code: current installation schedule. Procurement packages include replacement of routers, switches, servers, workstations, multi-level thin clients, firewalls across the five security enclaves or be as complex as a complete network refresh. COTS hardware/software awarded through competitive IDIQ contracts. There are over 3,900 different STACC devices fielded at over 93 sites across the globe. (19) FY 2027 funds eleven (11) STACC site surveys and installation design plan for (11) procurements. Design Service Allocation tasking covers Installation Planning and Design to include site surveys, installation requirements drawings (IRDs), system SOVTs, installation work scopes, installation cost estimates, installation design plans (IDPs), base electronic systems engineer plans (BESEPs), and training system installation plans (TSIPs). (20) (21) Primary engineering and integration efforts for STACC Procurements are comprised of COTs hardware/software awarded through competitive IDIQ contracts LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 25 of 29 P-1 Line #74 Volume 2 - 713 === page 794 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 49.607 7.382 4.847 7.345 0.000 7.345 7.221 7.239 7.316 - - - - - - - - - 49.607 7.382 4.847 7.345 0.000 7.345 7.221 7.239 7.316 - - - - - - - - - 49.607 7.382 4.847 7.345 0.000 7.345 7.221 7.239 7.316 To FY 2031 Complete 5.878 Continuing - Continuing - 5.878 Continuing - Total - Continuing - - 5.878 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Piers/ Enterprise Pier Connectivity Architecture (EPCA) quantities represent the number of operational US NAVY pierside locations that will be "touched" in some capacity each fiscal year. Unit cost fluctuations are a direct result of the various sizes of each location. Location size determines the cost and amount of equipment that needs to be procured and installed. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 26 of 29 P-1 Line #74 Volume 2 - 714 === page 795 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) A Kits Recurring 1.1.1) Global Piers - Ashore - NonOrganic (22) Subtotal: Recurring 15 / 33.514 / 33.514 - Subtotal: PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) Subtotal: Procurement, All Modification Items 2 / 5.108 - 15 / 33.514 / 5.108 1 / 2.651 - 2 / 5.108 / 2.651 - 1 / 2.651 2 / 4.923 - / - / 4.923 - / - 2 / 4.923 - / - 2 / 4.923 - / 4.923 2 / 5.071 - 2 / 4.923 / 5.071 2 / 5.172 - 2 / 5.071 / 5.172 2 / 4.982 - 2 / 5.172 / 4.982 - 2 / 4.982 2 / 4.197 Continuing Continuing / 4.197 Continuing Continuing 2 / 4.197 Continuing Continuing / 33.514 - / 5.108 - / 2.651 - / 4.923 - / - - / 4.923 - / 5.071 - / 5.172 - / 4.982 - / 4.197 Continuing Continuing - / 2.451 - / 0.255 - / 0.122 - / 0.245 - / - - / 0.245 - / 0.254 - / 0.259 - / 0.249 - / 0.175 Continuing Continuing - / 2.451 - / 0.255 - / 0.122 - / 0.245 - / - - / 0.245 - / 0.254 - / 0.259 - / 0.249 - / 0.175 Continuing Continuing / 0.000 - / 2.177 - / 1.896 - / 1.808 - / 2.085 - / 1.506 Continuing Continuing / - - / 2.177 - / 1.896 - / 1.808 - / 2.085 - / 1.506 Continuing Continuing 5.878 Continuing Continuing - Support (All Modification Items) 2.1) Piers - Production Support (23) Subtotal: Support Installation Modification Item 1 of 1: PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) - / 13.642 - / 2.019 - / 2.074 - / 2.177 Subtotal: Installation - / 13.642 - / 2.019 - / 2.074 - / 2.177 - Total Total Cost (Procurement + Support + Installation) LI 3050 - Ship Communications Automation Navy 49.607 7.382 4.847 7.345 0.000 UNCLASSIFIED Page 27 of 29 7.345 7.221 7.239 P-1 Line #74 7.316 Volume 2 - 715 === page 796 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3050 / Ship Communications Automation Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) MDAP/MAIS Code: Modification Item 1 of 1: PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) Manufacturer Information Manufacturer Name: Naval Informaiton Warfare Center (NIWC) Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Global Piers - Ashore Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 13.642 FY 2025 15 / 13.642 - / - 2 / 2.019 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.019 FY 2026 - / - - / - 1 / 2.074 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 2.074 FY 2027 - / - - / - - / - 2 / 2.177 0 / 0.000 2 / 2.177 - / - - / - - / - - / - 0 / 0.000 2 / 2.177 FY 2028 - / - - / - - / - - / - - / - - / - 2 / 1.896 - / - - / - - / - 0 / 0.000 2 / 1.896 FY 2029 - / - - / - - / - - / - - / - - / - - / - 2 / 1.808 - / - - / - 0 / 0.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.085 - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.506 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 15 / 13.642 2 / 2.019 1 / 2.074 2 / 2.177 0 / 0.000 2 / 2.177 2 / 1.896 2 / 1.808 2 / 2.085 Continuing 2 / 1.808 Continuing 0 / 0.000 2 / 1.506 / - Continuing Continuing 2 / 1.506 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 15 - - 2 - - - 1 - - - 2 - - - 2 - - - 2 - - - 2 - - - 2 - Cont. Cont. Out 12 - 2 - - - - - - - - - - - - - Cont. Cont. 1 2 - 1 - 2 - 2 - 2 - 2 - Tot Footnotes: (22) In FY27, Piers / Enterprise Pier Connectivity Architecture (EPCA) will procure (2) upgrade systems and install that system at (2) predetermined Areas of Responsibility (AOR's). EPCA installed units at pier side locations will address pier Information Technology (IT) infrastructure modernization in support of Force Protection matter of urgency. Funds will support pre-installation design, site surveys, procurement of LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 28 of 29 P-1 Line #74 Volume 2 - 716 === page 797 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 P-1 Line Item Number / Title: 3050 / Ship Communications Automation ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PQ020 Piers / Enterprise Pier Connectivity Architecture (EPCA) MDAP/MAIS Code: hardware and software, production support, and installation of Piers IT infrastructure. Installation costs vary due to site specific infrastructure, installation equipment required and physical site location, ranging typically between $0.9M-$1.07M. Due to delivery time, installations occur 3 quarters after procurement. (23) FY27 funding increase driven by increase in number of procurement of upgrade systems and installs. LI 3050 - Ship Communications Automation Navy UNCLASSIFIED Page 29 of 29 P-1 Line #74 Volume 2 - 717 === page 798 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 718 === page 799 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3057 / Communications Items under $5M Program Elements for Code B Items: N/A Other Related Program Elements: 0604280N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 395.604 395.604 395.604 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 9.209 11.138 15.097 0.000 15.097 16.937 16.658 16.842 - - - - - - - - 9.209 11.138 15.097 0.000 15.097 16.937 16.658 16.842 To FY 2031 Complete - Total - 17.172 Continuing - Continuing - 17.172 Continuing - Continuing - - - - - - - - - - 9.209 11.138 15.097 0.000 15.097 16.937 16.658 16.842 17.172 Continuing Continuing 0.877 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.692 0.002 0.488 - 0.488 1.439 1.089 0.945 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: [P5 / NU019 Amphibious Communications]: Amphib Comms: Enhanced Position Location Reporting System - Data Radio (EPLRS-DR)/Enhanced Man-Pack UHF Tactical (EMUT) provides secure Anti-Jam (AJ), Ultra High Frequency (UHF) (420-450 MHz) and Line of Sight (LOS) data communications in support of amphibious operations at throughputs of up to 54 Kbps. EPLRS-DR provides embedded Position Location Information (PLI) between shipboard networks and the shore-based Marine Tactical Data Network (TDN) and the Army Tactical Internet (TI). Single Channel Ground and Airborne Radio System (SINCGARS) provides secure, anti-jam very high frequency (VHF) voice and data communications. Funding in FY27 includes procurement of 2 VRC-250 Upgrade Kit, 2 Tri-Band Antennas, and 3 Landing Force Iridium systems to be installed in FY28. Funding in FY27 also includes installation of 15 VRC-250 Upgrade Kit, 4 Tri Band Antennas, 7 MUOS Functional Terminals, and 8 Landing Force Iridium systems that were procured in FY26. [P5 / NU020 Amphib Comms HFSAR]: High Frequency Shipboard Automatic Link Extension Radio (HFSAR) is a USMC support capability required on Amphibious platforms. HFSAR provides ship-to-mobile unit HF ALE capable system for rapid setup of critical LOS and over-the-horizon (OTH) communications in support of afloat and ashore intelligence and reconnaissance units. HFSAR provides a 2-channel HF Automatic Link Extension (ALE) capability aboard Amphibious class ships to support the embarked Marine Air-Ground Task Force (MAGTF) Commander by providing terrestrial, long-haul, ship-to-ship and shipto-shore connectivity that is a critical Beyond Line of Sight (BLOS), over the-horizon (OTH), and Near Vertical Incidence Skywave (NVIS) warfighting requirement. This system is one of AC3 / Naval Tactical Grid systems formally specified by both Fleet Commanders as a threshold capability for global maritime command control and communications in a Distributed Maritime Environment to execute current warfighting plans. Funding in FY27 includes procurement of 5 HFSAR 2.0 upgrade kits to be installed in FY28. Funding in FY27 also includes installation of 5 HFSAR 2.0 upgrade kits for Marine Embarked Units (MEU), that were procured in FY26, to support HF/UHF communications between the Landing Force Operations Center (LFOC) and Marines ashore, and to ensure interoperability between the Navy and Marine Corps. LI 3057 - Communications Items under $5M Navy UNCLASSIFIED Page 1 of 6 P-1 Line #75 Volume 2 - 719 === page 800 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 11: Shipboard Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3057 / Communications Items under $5M Program Elements for Code B Items: N/A Other Related Program Elements: 0604280N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Communications Items under $5M P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 395.604 - / 9.209 - / 11.138 - / 15.097 - / 0.000 - / 15.097 - / 395.604 - / 9.209 - / 11.138 - / 15.097 - / 0.000 - / 15.097 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: NU019 - Amphibious Communications (Amphib Comms): FY27 funding provides critical communications equipment to the USMC to meet afloat Command, Control, Communications, and Computers (C4) requirements. FY27 funding will provide Amphib Comms which includes Enhanced Position Location Radio System (EPLRS) Data Radio (DR), Mobile User Objective System (MUOS) Functional Terminal (MFT), Landing Force Iridium (LFI), Tri-Band Antenna upgrade, and Single Channel Ground and Airborne Radio System (SINCGARS). EPLRS and SINCGARS modernization aligns with the Navy's foundational priorities of readiness and capabilities as outlined in the Chief of Naval Operations 2022 Navigation Plan. Consolidating these systems under Amphib Comms will better allow the United States Navy to meet the requirements called out in the Afloat Marine Air Ground Task Force (MAGTF) C4 Required Capabilities Letter (AMC4RC) which calls out the major requirements of the USMC afloat in order to fight the battle from sea. These systems combined are integral in a Distributed Maritime Environment aboard Amphibious USN ships. Funding in FY27 includes procurement of 2 VRC-250 Upgrade Kit, 2 Tri-Band Antennas, and 3 Landing Force Iridium systems to be installed in FY28. Funding in FY27 also includes installation of 15 VRC-250 Upgrade Kit, 4 Tri Band Antennas, 7 MUOS Functional Terminals, and 8 Landing Force Iridium systems that were procured in FY26. NU020 - HFSAR provides a 2-channel HF Automatic Link Extension (ALE) capability aboard Amphibious class ships to support the embarked Marine Air-Ground Task Force (MAGTF) Commander by providing terrestrial, long-haul, ship-to-ship and ship-to-shore connectivity that is a critical Beyond Line of Sight (BLOS), over the-horizon (OTH), and Near Vertical Incidence Skywave (NVIS) warfighting requirement. This system is one of AC3 / Naval Tactical Grid systems formally specified by both Fleet Commanders as a threshold capability for global maritime command control and communications in a Distributed Maritime Environment to execute current warfighting plans. Funding in FY27 includes procurement of 5 HFSAR 2.0 upgrade kits to be installed in FY28. Funding in FY27 also includes installation of 5 HFSAR 2.0 upgrade kits for Marine Embarked Units (MEU), that were procured in FY26, to support HF/UHF communications between the Landing Force Operations Center (LFOC) and Marines ashore, and to ensure interoperability between the Navy and Marine Corps. NU790 - Navy Expeditionary Command, Control, Communications, Computers, & Intelligence (C4I): Executes procurements for outfitting Table of Allowance (TOA) buy lists within the Naval Special Warfare (NSW) forces, ensuring common communications and Automated Data Processing (ADP) solutions are being coordinated, tracked, and procured. These procurements are critical to provide Deployable Distributed (D2) Command, Control & Communications (C3). FY27 funding provides mission critical communications equipment, to include one NSW variant Expeditionary Deployable Node (EDN), Global Broadcast System (GBS), portable handheld radios, man pack radios, secure satellite telephones, unmanned air vehicle (UAV) communication devices, and encryption-decryption devices to US Navy Sea, Air, and Land (SEAL) combat operations in forward deployed contingency locations. This equipment provides real-time, actionable, time-sensitive transmission and reception of mission orders, intelligence, action and engagement status reporting, imaging, and target specification simultaneously in multiple theaters throughout the world. The disaggregated nature of current operations has smaller SEAL Teams deployed across the Geographic Combatant Commanders (GCC) conducting combat or combat advise operations in austere environments with little-to-no established DoW infrastructure. This equipment supports NSW core mission requirements and is essential to the readiness and battlefield effectiveness of NSW in winning the current fight against extremist elements. LI 3057 - Communications Items under $5M Navy UNCLASSIFIED Page 2 of 6 P-1 Line #75 Volume 2 - 720 === page 801 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3057 / Communications Items under $5M Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Communications Items under $5M MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 9.209 11.138 15.097 0.000 15.097 - Gross/Weapon System Cost ($ in Millions) 395.604 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 395.604 Plus CY Advance Procurement ($ in Millions) - - - - - 9.209 11.138 15.097 0.000 15.097 - Total Obligation Authority ($ in Millions) 395.604 FY 2027 Total - - - - - 9.209 11.138 15.097 0.000 15.097 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.692 0.002 0.488 - 0.488 Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - NU019 Amphibious Communications Cost Non Recurring Cost 1.1.1) Amphib Comms (†) VRC-250 Upgrade 69.969 98 6.857 - - - 53.690 15 0.805 54.740 2 0.109 - - - 54.740 2 0.109 (†) (2) 3.845 58 0.223 3.800 10 0.038 3.914 4 0.016 4.100 2 0.008 - - - 4.100 2 0.008 1.1.3) Amphib Comms MUOS Functional 34.550 60 2.073 36.500 6 0.219 37.429 7 0.262 - - - - - - 4.229 48 0.203 4.455 11 0.049 4.500 8 0.036 4.601 0.014 - - - 4.601 - - 9.356 - - 0.306 - - 1.119 - - 0.131 - - - - - 0.131 - - 9.356 - - 0.306 - - 1.119 - - 0.131 - - - - - 0.131 2.270 - - - 2.270 - - - (1) 1.1.2) Amphib Comms Tri Band Antenna (†) Terminal 1.1.4) Amphib Comms Landing Force (†) (3) Iridium Subtotal: Non Recurring Cost Subtotal: Hardware NU019 Amphibious Communications Cost - 3 - - 3 0.014 Hardware - NU020 Amphib Comms HFSAR Cost Non Recurring Cost 2.1.1) NU020 Amphib (†) (4) - - - - - - Subtotal: Non Recurring Cost - - - - - - Comms HFSAR LI 3057 - Communications Items under $5M Navy 452.000 - 5 - 2.260 2.260 UNCLASSIFIED Page 3 of 6 454.000 - 5 - P-1 Line #75 454.000 - 5 - 2.270 2.270 Volume 2 - 721 === page 802 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3057 / Communications Items under $5M Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Communications Items under $5M MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Subtotal: Hardware - NU020 Amphib Comms HFSAR Cost Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - 2.260 - - 2.270 - - - - - 2.270 - - 86.259 - - 6.123 - - 4.512 - - 4.009 - - - - - 4.009 Hardware - NU790 Navy Expeditionary C4I Cost Recurring Cost 3.1.1) Navy Expeditionary C4I Procurement (5) 3.1.2) GBS Portable - - - - - - - - - - - 5.342 - - - - - 5.342 Subtotal: Recurring Cost - - 86.259 - - 6.123 - - 4.512 - - 9.351 - - - - - 9.351 Subtotal: Hardware - NU790 Navy Expeditionary C4I Cost - - 86.259 - - 6.123 - - 4.512 - - 9.351 - - - - - 9.351 Receive Terminal (6) Support - NU777 Installations (NU777) Cost 4.1) Amphib Comms - - 9.567 - - 2.012 - - 2.116 - - 1.547 - - - - - 1.547 4.2) Amphib Comms HF SAR Installations (NU777) - - - - - - - - - - - 0.700 - - - - - 0.700 Subtotal: Support - NU777 Installations (NU777) Cost - - 9.567 - - 2.012 - - 2.116 - - 2.247 - - - - - 2.247 - - 3.689 - - 0.623 - - 0.927 - - 0.537 - - - - - 0.537 - - 3.689 - - 0.623 - - 0.927 - - 0.537 - - - - - 0.537 Installations (NU777) (7) Support - NU777 DSA Cost 5.1) Amphib Comms DSA (8) Subtotal: Support - NU777 DSA Cost Support - NU555 Production Support Cost 6.1) Amphib Comms Production Support - - 0.737 - - 0.020 - - 0.022 - - 0.020 - - - - - 0.020 6.2) Navy Expeditionary C4I Production Support - - 4.755 - - 0.125 - - 0.092 - - 0.200 - - - - - 0.200 6.3) GBS Portable Receive Terminal Prod Spt - - - - - - - - - - - 0.281 - - - - - 0.281 6.4) Amphib Comms HF SAR Production Support - - - - - - - - 0.090 - - 0.060 - - - - - 0.060 - - 281.241 - - - - - - - - - - - - - - - - - 286.733 - - 0.145 - - 0.204 - - 0.561 - - - - - 0.561 6.5) Consolidated Prior Year Requirements (9) Subtotal: Support - NU555 Production Support Cost LI 3057 - Communications Items under $5M Navy UNCLASSIFIED Page 4 of 6 P-1 Line #75 Volume 2 - 722 === page 803 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3057 / Communications Items under $5M Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Communications Items under $5M MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($ K) - FY 2025 Total Cost Qty (Each) ($ M) - 395.604 Unit Cost ($ K) - FY 2026 Total Cost Qty (Each) ($ M) - 9.209 Unit Cost ($ K) - FY 2027 Base Total Cost Qty (Each) ($ M) - 11.138 Unit Cost ($ K) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 15.097 Unit Cost ($ K) - FY 2027 Total Total Cost Qty (Each) ($ M) - 0.000 Unit Cost ($ K) - Total Cost Qty (Each) ($ M) - 15.097 indicates the presence of a P-5a Footnotes: (1) (2) Amphib Comms VRC-250 Upgrade: The quantity procured and installed (in any given year) is determined by the fleet's demand signal and platform availability and leverages the ISEA to combine installs. Amphib Comms Tri Band Antenna: Procurement and installation quantities are driven by fleet demand and platform availability, utilizing the ISEA to combine installations, while cost adjustments reflect inflation considerations, ship material condition issues, and complex nature of the required alterations. (3) Amphib Comms Landing Force Iridium: Procurement and installation quantities are driven by fleet demand and platform availability, utilizing the ISEA to combine installations, while cost adjustments reflect inflation considerations, ship material condition issues, and complex nature of the required alterations. (4) Amphib Comms HFSAR: Modernized HFSAR adds new capabilities to address the cryptographic modernization mandates while meeting HF 3G Automatic Link Establishment (ALE) operational waveform requirement. (5) Quantities are not provided based on thousands of various communication and Automated Data Processing (ADP) equipment being procured in support of correcting Naval Special Warfare (NSW) Table of Allowances (TOA) equipment shortfalls. (6) Quantities are not provided based on thousands of various communication and Automated Data Processing (ADP) equipment being procured in support of correcting Naval Special Warfare (NSW) Table of Allowances (TOA) equipment shortfalls. GBS Portable Receive Terminals are turn-key and therefore do not have installation costs associated with them. Starting in FY27 associated funding was realigned to BLI 3057 (previously 3215) (7) Amphib Comms: Installation costs fluctuate annually depends on fleet demand, platform availability, and ISEA's combined installation efforts. Increase cost estimates stem from inflation impacting material and labor rates, unexpected ship conditions needing extra work and alterations complexity. (8) Amphib Comms: Pre-Installation DSA are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations in any given fiscal year. (9) Consolidated prior years for PORT RAD - Hand Held Procurement, Hydra Procurement, NAVSEA HYDRA Requirement, DAMA IW Procurement, Hydra Installations FMP, HF SAR Installations FMP, PORT NSW Handheld and Man Pack Procurements, NAVSEA ESB SOF Procurements and Installation, EPR Crypto Mod Hand Held, EPR Crypto Mod Manpack, BISOG Non-Recurring Equipment, PRP Production Support and BFTN/BFTN+ (Procurement, Integrations, ECO, NRE, Installations, DSA, and Production Support). LI 3057 - Communications Items under $5M Navy UNCLASSIFIED Page 5 of 6 P-1 Line #75 Volume 2 - 723 === page 804 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 11 Item Number / Title [DODIC]: 1 / Communications Items under $5M FY Contractor and Location Method/Type or Funding Vehicle 1.1.1) Amphib Comms VRC-250 Upgrade 2026 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2026 Oct 2026 15 53.690 Y Nov 2025 1.1.1) Amphib Comms VRC-250 Upgrade 2027 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2027 Oct 2027 2 54.740 Y Nov 2026 1.1.2) Amphib Comms Tri Band Antenna 2025 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2025 Oct 2025 10 3.800 Y Nov 2024 1.1.2) Amphib Comms Tri Band Antenna 2026 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2026 Oct 2026 4 3.914 Y Nov 2025 1.1.2) Amphib Comms Tri Band Antenna 2027 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2027 Oct 2027 2 4.100 Y Nov 2026 1.1.3) Amphib Comms MUOS Functional Terminal 2025 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2025 Oct 2025 6 36.500 Y Nov 2024 1.1.3) Amphib Comms MUOS Functional Terminal 2026 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2026 Oct 2026 7 37.429 Y Nov 2025 1.1.4) Amphib Comms Landing Force Iridium 2025 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2025 Oct 2025 11 4.455 Y Nov 2024 1.1.4) Amphib Comms Landing Force Iridium 2026 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2026 Oct 2026 8 4.500 Y Nov 2025 1.1.4) Amphib Comms Landing Force Iridium 2027 Harris Corporation / Rochester, NY C / FFP NAVWAR May 2027 Oct 2027 3 4.601 Y Nov 2026 2.1.1) NU020 Amphib Comms HFSAR 2026 Harris Corporation / Rochester, NY C / FFP NAVWAR Jan 2026 Oct 2026 5 452.000 Y Nov 2025 2.1.1) NU020 Amphib Comms HFSAR 2027 Harris Corporation / Rochester, NY C / FFP NAVWAR Jan 2027 Oct 2027 5 454.000 Y Nov 2025 Cost Elements O O C P-1 Line Item Number / Title: 3057 / Communications Items under $5M LI 3057 - Communications Items under $5M Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 6 of 6 P-1 Line #75 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 2 - 724 === page 805 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3107 / Submarine Broadcast Support Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 436.069 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 436.069 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 436.069 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 129.467 129.467 129.467 113.115 113.115 113.115 173.069 173.069 173.069 0.000 0.000 0.000 173.069 173.069 173.069 157.445 184.987 - - 157.445 184.987 - - 157.445 184.987 195.501 195.501 195.501 To FY 2031 Complete 168.543 Continuing 168.543 Total - Continuing Continuing - Continuing - - Continuing Continuing 0.231 Continuing Continuing 168.543 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.948 - 1.142 - 1.142 2.597 2.468 0.251 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3107 - Submarine Broadcast Support Navy UNCLASSIFIED Page 1 of 3 P-1 Line #76 Volume 2 - 725 === page 806 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3107 / Submarine Broadcast Support Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Broadcast Support - / 436.069 - / 129.467 - / 113.115 - / 173.069 P-40 Total Gross/Weapon System Cost - / 436.069 - / 129.467 - / 113.115 - / 173.069 - / - - / 173.069 / 0.000 - / 173.069 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3107 - Submarine Broadcast Support Navy UNCLASSIFIED Page 2 of 3 P-1 Line #76 Volume 2 - 726 === page 807 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3107 / Submarine Broadcast Support Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ K) Qty (Each) Aggregated Items Title: Submarine Broadcast Support FY 2027 Base Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 1) Submarine Broadcast Support 1.1) Submarine Broadcast Support A - - 436.069 - - 129.467 - - 113.115 - - 173.069 - - - - - 173.069 Subtotal: 1) Submarine Broadcast Support - - 436.069 - - 129.467 - - 113.115 - - 173.069 - - - - - 173.069 Total - - 436.069 - - 129.467 - - 113.115 - - 173.069 - - - - - 173.069 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 3107 - Submarine Broadcast Support Navy UNCLASSIFIED Page 3 of 3 P-1 Line #76 Volume 2 - 727 === page 808 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 728 === page 809 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3130 / Submarine Communication Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 68.334 84.584 88.071 0.000 88.071 87.400 89.360 91.656 1,427.313 1,427.313 1,427.313 - - - - - - - - 68.334 84.584 88.071 0.000 88.071 87.400 89.360 91.656 To FY 2031 Complete - Total - 94.133 Continuing - Continuing - 94.133 Continuing - Continuing - - - - - - - - - - 68.334 84.584 88.071 0.000 88.071 87.400 89.360 91.656 94.133 Continuing Continuing 1.651 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.650 0.102 1.029 - 1.029 1.271 0.833 1.778 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3130 - Submarine Communication Equipment Navy UNCLASSIFIED Page 1 of 3 P-1 Line #77 Volume 2 - 729 === page 810 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3130 / Submarine Communication Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Communication Equipment - / 1,427.313 - / 68.334 - / 84.584 - / 88.071 P-40 Total Gross/Weapon System Cost - / 1,427.313 - / 68.334 - / 84.584 - / 88.071 - / - - / 88.071 / 0.000 - / 88.071 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3130 - Submarine Communication Equipment Navy UNCLASSIFIED Page 2 of 3 P-1 Line #77 Volume 2 - 730 === page 811 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3130 / Submarine Communication Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ K) Qty (Each) Aggregated Items Title: Submarine Communication Equipment FY 2027 Base Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ K) Qty (Each) (1) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 1) Submarine Communication Equipment 1.1) Submarine Communication Equipment A - - 1,427.313 - - 68.334 - - 84.584 - - 88.071 - - - - - 88.071 Subtotal: 1) Submarine Communication Equipment - - 1,427.313 - - 68.334 - - 84.584 - - 88.071 - - - - - 88.071 Total - - 1,427.313 - - 68.334 - - 84.584 - - 88.071 - - - - - 88.071 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3130 - Submarine Communication Equipment Navy UNCLASSIFIED Page 3 of 3 P-1 Line #77 Volume 2 - 731 === page 812 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 732 === page 813 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 237 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,560.417 1,560.417 1,560.417 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 59.732 62.943 57.961 0.000 57.961 69.478 35.139 32.380 - - - - - - - - 59.732 62.943 57.961 0.000 57.961 69.478 35.139 32.380 To FY 2031 Complete - Total - 33.043 Continuing - Continuing - 33.043 Continuing - Continuing - - - - - - - - - - 59.732 62.943 57.961 0.000 57.961 69.478 35.139 32.380 33.043 Continuing Continuing 5.269 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.178 0.275 2.567 - 2.567 3.340 15.415 5.673 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Satellite Communications (SATCOM) Systems line provides funding for the procurement of shipboard terminal equipment for ship-to-ship, ship-to-shore, and ship-to-aircraft tactical communications via earth orbiting relay satellites. This includes Radio Frequency (RF) equipment and baseband equipment assembled and grouped into systems and subsystems structured to address specific naval communications requirements. These systems provide modem processors and peripheral equipment that control the RF links for message traffic, direct data transfer, and secure voice communications. They are selected and oriented by communications traffic levels, types of communications, and operational missions. The Wideband Anti-Jam Modem System (WAMS) is a Navy technology upgrade that enhances communication capability of shipboard and submarine Navy Multiband Terminals (NMTs) by providing wideband Anti-Jam (AJ) Satellite Communication throughput over Wideband Global SATCOM (WGS). WAMS is a major contributor in supporting the National Defense Strategy by investing in resilience to provide assured communications capabilities. WAMS enables space segment Anti Jam (AJ) diversity (Extremely High Frequency/Advanced Extremely High Frequency (EHF/AEHF) and WGS), thus enabling ships and submarines equipped with the modem to operate in wideband links closer to threat jammers. WAMS enables the use of WGS X and Ka-band resources to assure access to mission critical communications to provide Resilient Command, Control, and Communications (RC3) capabilities in contested/degraded environments, formerly known as Anti-Access/Area Denial (A2AD). The use of WAMS Protected Tactical Waveform (PTW) on WGS will augment AEHF Extended Data Rate (XDR) services to provide the information throughput capacity necessary to support critical Command and Control capability. Demand Assigned Multiple Access (DAMA)/ Miniaturized DAMA: Ultra High Frequency (UHF) DAMA and MINI DAMA systems supports Command and Control (C2) voice and data communications over Satellite and Line of Sight (LOS) links. UHF SATCOM systems are formally specified as a threshold capability for global maritime command control and communications in a Distributed Maritime Environment to execute current warfighting plans and are required for National Command and Control capability. Cryptographic modernization is required for UHF systems to continue use and enable operations (e.g. Ballistic Missile Defense (BMD), Tomahawk Strike Network (TSN) and Intelligence Broadcast Services (IBS)). Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 6510.02E directs the military Services to modernize National Security Agency (NSA) certified cryptographic products and algorithms prior to published Last Year of Use dates to ensure secure, interoperable information sharing. NSA's published de-certification and cease key dates for crypto algorithm contained in UHF legacy communications systems. Funding provides for the engineering, testing, procurement, and product integration, including Thornton TRANSEC Algorithm Modernization (TTAM) efforts. TTAM modernization of UHF DAMA and MINI DAMA systems aligns with the Navy's foundational priorities of readiness and capabilities. FY 2024 is the last year of fielding. [P3A / (NR117) Global Broadcast Service (GBS)]: GLOBAL BROADCAST SERVICE (GBS - NR117): GBS is a Joint Satellite Communications (SATCOM) program with the Air Force as Executive Agent for all services. GBS provides a continuous, high-speed, one-way information flow of high-volume data to units ashore, afloat, or special operations. GBS supports routine operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, and reconnaissance. Deployment of GBS Internet Protocol (IP) terminals will allow expanded use of military intelligence collection in a broader LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 1 of 18 P-1 Line #78 Volume 2 - 733 === page 814 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 237 spectrum using SATCOM architecture. The Navy GBS Split IP effort enables near-real-time duplex asymmetric communications connectivity to ships/submarines. GBS plays a pivotal role to support the Assured Command and Control (AC2) environment. [P3A - 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat]: CBSP is the U.S. Navy Commercial SATCOM program that provides the Navy's access to geostationary and Non-Geostationary Satellite Orbit (NGSO) constellations. CBSP provides diversity for MILSATCOM on Unit Level Variant (ULV) ships, and augments MILSATCOM on Force Level Variant (FLV) ships. CBSP with STtNG is the only Navy program that provides a hybrid, multi-orbit system that leverages the commercial sector's innovative and rapidly evolving capabilities in non-geostationary orbit services to promote communications resilience, with lower cost, increased capacity, and lower latency. STtNG Inc 1 enables Navy to access SpaceX. STtNG Inc 2 begins fielding in FY 2027 to provide access to mPower, Amazon Kuiper, and geostationary waveforms and modems for use in denied and degraded environments. CBSP will support the procurement and installation of a commercial terminal and service architecture that significantly increase data throughput, Navy Resilient Command and Control (RC3), and communication reliability. CBSP also increases space resiliency by providing band diversity, assured access, and redundancy for MILSATCOM. Included in the program are Small Ship Variant (SSV - Patrol Coastal and Mine Countermeasure Ships), Unit Level Variant (ULV - including Guided Missile Destroyers and Guided Missile Frigates), and Force Level Variant (FLV - large combatant ships including Carriers). Satellite Terminal (transportable) Non-Geostationary (STtNG) is variant of CBSP which fields a Commercial Off the Shelf terminal and militarized common interface system to access Non-Geostationary Satellite Orbits (NGSO) Proliferated Low/Medium/High Earth Orbit (PLEO/MEO/HEO) constellations. STtNG augments the CBSP family of terminals, taking advantage of additional commercial space segments, to provide a simultaneous multiband failover capability to current MIL/COMSATCOM systems. Quantities reflected in the budget enable a flexible architecture, initially with Ku band, and includes the planned addition of a Ka band antenna. STtNG supports the Naval Operational Architecture (NOA) by adding satellite frequency diversity through a transportable system which will support current and future modems. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 2 of 18 P-1 Line #78 Volume 2 - 734 === page 815 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 237 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Satellite Communications Systems P-3a 1 / (NR117) Global Broadcast Service (GBS) (TBD) - P-3a 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat (upgrade) - P-3a 3 / CBSP Wideband Anti-Jam Modem System (WAMS) (TBD) P-40 Total Gross/Weapon System Cost - Title* - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 / 287.087 - / 8.295 - / 7.841 - / 4.265 - / 0.000 - / 4.265 / 189.921 - / 40.031 - / 41.061 - / 44.278 - / 0.000 - / 44.278 / 0.255 - / 11.406 - / 14.041 - / 9.418 - / 0.000 - / 9.418 / 1,560.417 - / 59.732 - / 62.943 - / 57.961 - / 0.000 - / 57.961 - Exhibits Schedule Exhibit Type / 1,083.154 Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Satellite Communications Systems P-3a 1 / (NR117) Global Broadcast Service (GBS) (TBD) - / 5.232 - / 8.877 - / 9.634 - / 9.712 P-3a 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat (upgrade) - / 62.885 - / 26.262 - / 22.746 - / 23.331 P-3a 3 / CBSP Wideband Anti-Jam Modem System (WAMS) (TBD) - / 1.361 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 69.478 - / 35.139 - / 32.380 - / 33.043 Continuing - / - - / - - / - - / - - / - - / - Continuing Continuing Continuing Continuing / 0.000 - / 36.481 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding request for Commercial Broadband Satellite Program (CBSP) increased by $3.217M from FY 2026 to align with initial fielding of Satellite Terminal (transportable) Non-Geostationary (STtNG) Increment (Inc) 2 terminals (Qty 29), to include six (6) Military Sealift Command (MSC) ships, and procurement and installation of S-band capability on STtNG equipped ships. Funding supports installation of Wideband Anti-Jam Modem System (WAMS) modems (Qty 14). FY 2027 funding for Global Broadcast System (GBS) will have a net decrease of $3.576M. This includes a targeted increase to procure and install GBS Afloat Receive Terminals on more DDG platforms, aligning with ship modernization schedules and program capacity. The net decrease is due to the realignment of GBS Portable Receive Terminals from OPN BLI 3215 Satellite Communications Systems to OPN BLI 3057 Communication Items Under $5M, to better support Naval Special Warfare (NSW) platforms. In FY 2027, the GBS program will procure six (6) Global Broadcast Systems (GBS). Starting in FY 2025, the CBSP program has updated its installation costs for STtNG terminals to reflect estimates based on historical actual cost data. The historical cost data is based on the last two (2) years of actual installation data. Increased estimates are attributed to greater than budgeted (~2%) inflation impacting material and labor rates, and changes to Ship Change Document (SCD) requirement specifications needed to address design changes and discrepancies found during pre-installation ship checks. Cost drivers include unanticipated extensions of production due to challenges such as procuring materials, system locations, or unforeseen services required. Prior estimates did not factor in sufficient risk for the uncertainty originating from forecasts based on component changes, installation services, cost increase impacts, and predecessor system installs data. The updated installation costs reflect cost realism based on the historical data by platform. STtNG Inc 2 will procure and field quantity 29 system in FY 2027. STtNG Inc 2 consists of a wideband and protected system. Inc 2 fields the wideband Starlink system, Assured Command and Control (AC2) modem, PNT/GPNTS connections (optional), and the ALL.SPACE multibeam antenna. Inc 2 establishes a protected connection to additional LEO constellations (Kuiper) and adds MEO and GEO satellite constellations with additional ADNS links. Inc 2 aligns with DoW CIO direction to Title X Services to field hybrid terminals in response to Congressional Tasking. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 3 of 18 P-1 Line #78 Volume 2 - 735 === page 816 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 237 LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 4 of 18 P-1 Line #78 Volume 2 - 736 === page 817 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Satellite Communications Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 1,083.154 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,083.154 Plus CY Advance Procurement ($ in Millions) - - - - - 0.000 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 1,083.154 FY 2027 Total - - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Consolidated Prior Year Requirements Cost Recurring Cost 1.1.1) Consolidated (1) - - 1,083.154 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost PY Requirements - - 1,083.154 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway Consolidated Prior Year Requirements Cost - - 1,083.154 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 1,083.154 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Footnotes: (1) Consolidated Prior Year Requirements costs includes GBS Modem Upgrades, GBS Interim Modem Upgrades, GBS Shore Pre-Installation Design, SHF, NESP, CBSP, and Spectral Warrior (SW) / Spider Net (SN), DAMA/MINI DAMA(LEGACY), JMINI Control System shore, CBSP Small Ship Variant (SSV), CBSP Fore Level Unit (FLV), (CBSP) Ka Kit Non-Recurring Engineering (NRE) (Procurement, DSA, Production Support, & Installation), CBSP AC2 Modems (Procurement, Production Support, and Install), JMINI CS Shore procurement & install dollars, and MILCON P-913 installation costs, DAMA/MINI DAMA procurement and installation (Afloat/Ashore), DAMA/MINI DAMA MANPACK procurement and installation, engineering change orders, production support, DSA and NRE. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 5 of 18 P-1 Line #78 Volume 2 - 737 === page 818 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3215 / Satellite Communications Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / (NR117) Global Broadcast Service (GBS) MDAP/MAIS Code: Prior Years 287.087 287.087 287.087 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 8.295 7.841 4.265 0.000 4.265 5.232 8.877 9.634 - - - - - - - - 8.295 7.841 4.265 0.000 4.265 5.232 8.877 9.634 - - - - - - - - 8.295 7.841 4.265 0.000 4.265 5.232 8.877 9.634 To FY 2031 Complete 9.712 Continuing - Continuing - 9.712 Continuing - Total - Continuing - - 9.712 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: GLOBAL BROADCAST SERVICE (GBS - NR117): GBS is a Joint Satellite Communications (SATCOM) program with the Air Force as Executive Agent for all services. GBS provides a continuous, high-speed, one-way information flow of high-volume data to units ashore, afloat, or special operations. GBS supports routine operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, and reconnaissance. Deployment of GBS Internet Protocol (IP) terminals will allow expanded use of military intelligence collection in a broader spectrum using SATCOM architecture. The Navy GBS Split IP effort enables near-real-time duplex asymmetric communications connectivity to ships/submarines. GBS plays a pivotal role to support the Assured Command and Control (AC2) environment. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 6 of 18 P-1 Line #78 Volume 2 - 738 === page 819 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (NR117) Global Broadcast Service (GBS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (NR117) Global Broadcast Service (GBS) B Kits Recurring 1.1.1) GBS Afloat Receive Terminal - NonOrganic 1.1.2) GBS Portable Receive Terminal - Organic (2) (3) 1.1.3) GBS Charlie Modernization Kit - NonOrganic 225 / 137.490 1 / 0.558 2 / 1.138 6 / 3.481 - / - 6 / 3.481 162 / 38.607 8 / 2.165 8 / 2.209 - / - - / - - / - - - - - / - - / - - / - 2 / 0.663 / 3.481 - / - - (4) Subtotal: Recurring / 176.097 - Subtotal: (NR117) Global Broadcast Service (GBS) / - / / 2.723 - / / 3.347 - / 3.481 - 4 / 2.367 - 7 / 4.225 / - / 3.030 - 7 / 4.310 / - - 6 / 2.029 - / 6.254 / - 5 / 1.725 - / 6.035 1 / 0.628 Continuing Continuing - Continuing Continuing / - 17 / 5.980 - / 6.608 Continuing Continuing - / - 30 / 10.397 6 / 3.481 - / - 18 / 6.608 Continuing Continuing / 176.097 - / 2.723 - / 3.347 - / 3.481 - / - - / 3.481 - / 3.030 - / 6.254 - / 6.035 - / 6.608 Continuing Continuing - / 25.594 - / 0.163 - / 0.185 - / 0.190 - / 0.000 - / 0.190 - / 0.142 - / 0.369 - / 0.204 - / 0.386 Continuing Continuing - / 14.224 - / 0.463 - / 0.336 - / 0.594 - / 0.000 - / 0.594 - / 0.560 - / 1.084 - / 1.115 - / 0.471 Continuing Continuing - / 13.595 - / 4.763 - / 3.600 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 Continuing Continuing - / 53.413 - / 5.389 - / 4.121 - / 0.784 / - - / 0.784 - / 0.702 - / 1.453 - / 1.319 - / 0.857 Continuing Continuing Modification Item 1 of 1: (NR117) Global Broadcast Service (GBS) - / 57.577 - / 0.183 - / 0.373 - / 0.000 / 0.000 - / 0.000 - / 1.500 - / 1.170 - / 2.280 - / 2.247 Continuing Continuing Subtotal: Installation - / 57.577 - / 0.183 - / 0.373 / - - / 1.500 - / 1.170 - / 2.280 - / 2.247 Continuing Continuing 9.712 Continuing Continuing Subtotal: Procurement, All Modification Items 387 / 176.097 - 9 / 2.723 10 / 3.347 6 / 3.481 6 / 3.030 13 / 6.254 12 / 6.035 Support (All Modification Items) 2.1) Production Support (5) 2.2) Afloat Receive Terminal DSA (6) 2.3) Engineering Change Order Subtotal: Support - Installation - / - - / - - Total Total Cost (Procurement + Support + Installation) LI 3215 - Satellite Communications Systems Navy 287.087 8.295 7.841 4.265 0.000 UNCLASSIFIED Page 7 of 18 4.265 5.232 8.877 P-1 Line #78 9.634 Volume 2 - 739 === page 820 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (NR117) Global Broadcast Service (GBS) MDAP/MAIS Code: Modification Item 1 of 1: (NR117) Global Broadcast Service (GBS) Manufacturer Information Manufacturer Name: SAIC Manufacturer Location: Reston, VA (7) Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates May 2025 May 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 Manufacturer Name: SAIC Inc Manufacturer Location: Reston, VA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 10 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Oct 2028 Oct 2029 Oct 2030 Oct 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: GBS Afloat Receive Terminal Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 225 / 57.577 FY 2025 - / - 1 / 0.183 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.183 FY 2026 - / - - / - 2 / 0.373 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.373 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 1.500 - / - - / - - / - 0 / 0.000 6 / 1.500 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 1.020 - / - - / - 0 / 0.000 4 / 1.020 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 1.821 - / - 0 / 0.000 7 / 1.821 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 1.857 0 / 0.000 7 / 1.857 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.271 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 2 / 0.373 - / - - / - - / - 6 / 1.500 7 / 1.857 Continuing Continuing Total 225 / 57.577 225 / 57.577 LI 3215 - Satellite Communications Systems Navy 1 / 0.183 UNCLASSIFIED Page 8 of 18 4 / 1.020 P-1 Line #78 7 / 1.821 1 / 0.271 Volume 2 - 740 === page 821 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (NR117) Global Broadcast Service (GBS) MDAP/MAIS Code: Modification Item 1 of 1: (NR117) Global Broadcast Service (GBS) Installation Information Method of Implementation: [none specified]:: Installation Name: GBS Afloat Receive Terminal Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 225 - - 1 - - - 1 1 - - - - 2 2 2 - 4 - - - 3 4 - - 2 2 3 - Cont. Cont. Out 222 - - - - - 2 2 - - 2 2 3 - - 1 - 1 1 - 2 - 4 - 3 4 - - Tot 3 Cont. Cont. Method of Implementation: [none specified]:: Installation Name: GBS Charlie Modernization Kit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 0.150 - / - - / - 0 / 0.000 2 / 0.150 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.459 - / - 0 / 0.000 6 / 0.459 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 0.390 0 / 0.000 5 / 0.390 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 1.400 17 / 1.400 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 2 / 0.150 Installation Cost 6 / 0.459 - 5 / 0.390 / - - 17 / 1.400 / - 30 / 2.399 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 1 1 - - 2 2 2 - 2 2 1 - 17 30 Out - - - - - - - - - - - - - - - - - 2 2 2 2 17 30 Method of Implementation (Organic): GBS Portable Receive Terminal - Not Installed - 1 1 - - 2 - 1 Installation Quantity: 0 Footnotes: LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 9 of 18 P-1 Line #78 Volume 2 - 741 === page 822 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3215 / Satellite Communications Systems ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / (NR117) Global Broadcast Service (GBS) MDAP/MAIS Code: (2) FY 2027 GBS Afloat Receive Terminal Procurement continues fielding requirements for Resilient Command and Control (RC2) that provides support to Fleet missions: Strike & Special Operations, Imagery and Intel Data (Live Streaming Video). To support DDG Flight Extensions, GBS received additional funding beginning in FY2027 to procure, install, and provide associated DSA for twelve (12) more GBS Afloat Receive Terminals, bringing the total number of procurements to twenty-five (25) across FY2027-2031. (3) GBS Portable Receive Terminals are turn-key and therefore do not have installation costs associated with them. Beginning in FY 2027 program funding is realigned to COMMUNICATIONS ITEMS UNDER $5M (BLI 3057) to optimize integration onto Naval Special Warfare (NSW) platforms. (4) GBS Charlie Modernization are retrofit kits to modernize Afloat Receive Terminals. Installs to take place one year after procurements due to 10 month lead time. The revised installation cost estimate is based on a decreased scope of work required for the installation of kits. (5) (6) Production support includes the cost of production engineering, quality assurance, and acceptance test and evaluation integral to the execution of the procurement program. Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. (7) Production lead time increased from 5 months to 10 months due to unforeseen disruptions in the supply chain. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 10 of 18 P-1 Line #78 Volume 2 - 742 === page 823 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3215 / Satellite Communications Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat MDAP/MAIS Code: Prior Years 189.921 189.921 189.921 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 40.031 41.061 44.278 0.000 44.278 62.885 26.262 22.746 - - - - - - - - 40.031 41.061 44.278 0.000 44.278 62.885 26.262 22.746 - - - - - - - - 40.031 41.061 44.278 0.000 44.278 62.885 26.262 22.746 To FY 2031 Complete 23.331 Continuing - Continuing - 23.331 Continuing - Total - Continuing - - 23.331 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: CBSP is the U.S. Navy Commercial SATCOM program that provides the Navy's access to geostationary and Non-Geostationary Satellite Orbit (NGSO) constellations. CBSP provides diversity for MILSATCOM on Unit Level Variant (ULV) ships, and augments MILSATCOM on Force Level Variant (FLV) ships. CBSP with STtNG is the only Navy program that provides a hybrid, multi-orbit system that leverages the commercial sector's innovative and rapidly evolving capabilities in non-geostationary orbit services to promote communications resilience, with lower cost, increased capacity, and lower latency. STtNG Inc 1 enables Navy to access SpaceX. STtNG Inc 2 begins fielding in FY 2027 to provide access to mPower, Amazon Kuiper, and geostationary waveforms and modems for use in denied and degraded environments. CBSP will support the procurement and installation of a commercial terminal and service architecture that significantly increase data throughput, Navy Resilient Command and Control (RC3), and communication reliability. CBSP also increases space resiliency by providing band diversity, assured access, and redundancy for MILSATCOM. Included in the program are Small Ship Variant (SSV - Patrol Coastal and Mine Countermeasure Ships), Unit Level Variant (ULV - including Guided Missile Destroyers and Guided Missile Frigates), and Force Level Variant (FLV - large combatant ships including Carriers). Satellite Terminal (transportable) Non-Geostationary (STtNG) is variant of CBSP which fields a Commercial Off the Shelf terminal and militarized common interface system to access Non-Geostationary Satellite Orbits (NGSO) Proliferated Low/Medium/High Earth Orbit (PLEO/MEO/HEO) constellations. STtNG augments the CBSP family of terminals, taking advantage of additional commercial space segments, to provide a simultaneous multiband failover capability to current MIL/COMSATCOM systems. Quantities reflected in the budget enable a flexible architecture, initially with Ku band, and includes the planned addition of a Ka band antenna. STtNG supports the Naval Operational Architecture (NOA) by adding satellite frequency diversity through a transportable system which will support current and future modems. FY 2027 funding request continues CBSP with initial procurement and installation of STtNG Inc 2 Terminals (Qty 29). Funding also supports installation of Wideband Anti-Jam Modem System (WAMS) modems (Qty 14). [Engineering Change Orders] Engineering changes required to Improve reliability and implement bandwidth efficiency technologies to increase system performance for fielded Small Ship Variants (SSV), Unit Level Variants (ULV) and Force Level Variants (FLV) including the addition of Proliferated Low Earth Orbit (PLEO), Medium Earth Orbit (MEO), and Highly Elliptical Orbit (HEO) capabilities. Engineering changes ensure the systems meet/maintain system operational availability (Ao) thresholds and take advantage of new technology. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 11 of 18 P-1 Line #78 Volume 2 - 743 === page 824 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat MDAP/MAIS Code: Models of Systems Affected: Submarines, ships Prior Years Modification Type: upgrade FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: (NR112) Commercial Broadband Satellite program (CBSP) - Afloat B Kits Recurring 1.1.1) Unit Level Variant (ULV) - NonOrganic 73 / 72.280 1.1.2) Satellite Terminal (transportable) Non- 35 / 13.300 Geostationary (STtNG) - NonOrganic (8) 1.1.3) Satellite Terminal (transportable) NonGeostationary (STtNG) Inc 2 - NonOrganic (9) 1.1.4) Satellite Terminal (transportable) NonGeostationary (STtNG) Inc 3 - NonOrganic Subtotal: Recurring Subtotal: Procurement, All Modification Items - / - 44 / 17.395 / - - / - - / - - / - - / - - / - 108 / 85.580 / 85.580 - / - - / 85.580 - Subtotal: (NR112) Commercial Broadband Satellite program (CBSP) - Afloat - 34 / 13.178 / 13.178 - 34 / 13.178 / 13.178 - / 17.395 - 44 / 17.395 / 17.395 - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - 29 / 18.821 - 29 / 18.821 - / 18.821 - / - - - / - 29 / 18.821 / 18.821 - / - - - / 18.821 / 18.821 / - 73 / 72.280 Continuing 32 / 21.184 9 / 6.077 7 / 4.821 7 / 4.917 - / - 84 / 55.820 9 / 7.200 7 / 5.712 7 / 5.826 7 / 5.943 - / - 30 / 24.681 / - 29 / 18.821 - - Continuing / 28.384 - 41 / 28.384 / 28.384 - / 11.789 - 16 / 11.789 / 11.789 - / 10.647 - 14 / 10.647 / 10.647 - / 10.860 Continuing Continuing 14 / 10.860 Continuing Continuing / 10.860 Continuing Continuing - - Support (All Modification Items) - / 7.136 - / 0.503 - / 0.612 - / 0.964 - / - - / 0.964 - / 1.106 - / 0.977 - / 0.435 - / 0.448 Continuing Continuing - / 3.328 - / 0.886 - / 1.044 - / 1.129 - / - - / 1.129 - / 1.318 - / 0.589 - / 0.532 - / 0.543 Continuing Continuing - / 21.023 - / 4.976 - / 5.353 - / 3.934 - / - - / 3.934 - / 3.458 - / 1.278 - / 0.693 - / 0.832 Continuing Continuing - / 31.487 - / 6.365 - / 7.009 - / 6.027 - / - - / 6.027 - / 5.882 - / 2.844 - / 1.660 - / 1.823 Continuing Continuing Modification Item 1 of 1: (NR112) Commercial Broadband Satellite program (CBSP) - Afloat - / 72.854 - / 20.488 - / 16.657 - / 19.430 Subtotal: Installation - / 72.854 - / 20.488 - / 16.657 - / 19.430 2.1) Engineering Change Orders 2.2) Production Support 2.3) Other (DSA) (10) (11) (12) Subtotal: Support Installation - / 0.000 - / 19.430 - / 28.619 - / 11.629 - / 10.439 - / 10.648 - / 3.000 - / 193.764 / - - / 19.430 - / 28.619 - / 11.629 - / 10.439 - / 10.648 - / 3.000 - / 193.764 23.331 Continuing - Total Total Cost (Procurement + Support + Installation) LI 3215 - Satellite Communications Systems Navy 189.921 40.031 41.061 44.278 0.000 UNCLASSIFIED Page 12 of 18 44.278 62.885 26.262 P-1 Line #78 22.746 Continuing Volume 2 - 744 === page 825 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat MDAP/MAIS Code: Modification Item 1 of 1: (NR112) Commercial Broadband Satellite program (CBSP) - Afloat Manufacturer Information Manufacturer Name: DISA - Satellite Terminal (transportable) Non-Geostationary (STtNG) Manufacturer Location: Scott AFB, IL Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates May 2025 May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 Installation Information Method of Implementation: Tiger Team:: Installation Name: Small Ship Variant (SSV), Unit Level Variant (ULV) and Force Level V Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 66 / 60.604 73 / 68.716 Prior Years 7 / 8.112 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 8.112 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 66 / 60.604 73 / 68.716 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 66 4 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - 73 Out 64 2 4 - - - - - - - - - - - - - - - - - - - - - - - - - - 73 3 LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 13 of 18 P-1 Line #78 Volume 2 - 745 === page 826 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / (NR112) Commercial Broadband Satellite program (CBSP) - Afloat MDAP/MAIS Code: Modification Item 1 of 1: (NR112) Commercial Broadband Satellite program (CBSP) - Afloat Installation Information Method of Implementation: Method:: Installation Name: Satellite Terminal (transportable) Non-Geostationary (STtNG) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 35 / 12.250 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 34 / 12.376 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 44 / 16.657 - / - - / - - / - - / - 0 / 0.000 29 / 19.430 - / - - / - - / - 0 / 0.000 41 / 28.619 - / - - / - 0 / 0.000 16 / 11.629 - / - 0 / 0.000 14 / 10.439 0 / 3.000 14 / 13.648 Prior Years 35 / 12.250 / - FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 34 / 12.376 35 / 12.250 44 / 16.657 29 / 19.430 34 / 12.376 44 / 16.657 0 / 0.000 29 / 19.430 29 / 19.430 0 / 0.000 41 / 28.619 29 / 19.430 16 / 11.629 41 / 28.619 14 / 10.439 16 / 11.629 14 / 10.648 - 14 / 10.439 / - - 14 / 10.648 / - - 0 / 3.000 227 / 125.048 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 35 - - 19 15 - - 22 22 - - 14 15 - - 20 21 - - 7 9 - - 6 8 - - 6 8 - 227 Out 18 17 - - 19 15 - - 22 22 - - 14 15 - - 16 20 5 - 4 8 4 - 6 8 - - 6 8 227 Footnotes: (8) (9) STtNG procurements and installations transition from Inc 1 to Inc 2 in FY 2027. STtNG Inc 2 begins fielding in FY 2027 with the procurement and installation of quantity 29 systems. (10) STtNG Engineering Change Order (ECO) enhances the communication capability of shipboard STtNG Inc 2s by providing an S-Band antenna and receiver which will connect to the existing STtNG Inc 2 system to provide additional survivable and interoperable military satellite communications in support of the Naval Operational Architecture (NOA), Resilient Command, and Control and Communications (RC3), and assured strategic communications; integrating the Navy into the Joint All-Domain Command and Control (JADC2) environment. ECO funding supports integration efforts which begin in FY 2026 and prefielding activities in FY 2027. (11) (12) Production support consists of financial, contractual, and programmatic costs associated with the production and installation of STtNG terminals and is tied to number of procurements in any given year. Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 14 of 18 P-1 Line #78 Volume 2 - 746 === page 827 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3215 / Satellite Communications Systems ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / CBSP Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.255 11.406 14.041 9.418 0.000 9.418 1.361 0.000 0.000 0.000 0.000 36.481 Total - - - - - - - - - - - - 0.255 11.406 14.041 9.418 0.000 9.418 1.361 0.000 0.000 0.000 0.000 36.481 - - - - - - - - - - - - 0.255 11.406 14.041 9.418 0.000 9.418 1.361 0.000 0.000 0.000 0.000 36.481 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Wideband Anti-Jam Modem System (WAMS) is a Navy technology upgrade that enhances communication capability of Navy SATCOM systems including CBSP variants through V4 STtNG by providing wideband Anti-Jam (AJ) Satellite Communication throughput over Wideband Global SATCOM (WGS). WAMS is a major contributor in supporting the National Defense Strategy by investing in resilience to provide assured communications capabilities. WAMS enables space segment Anti Jam (AJ) diversity (EHF/AEHF and WGS), thus enabling ships and submarines equipped with the modem to operate in wideband links closer to threat jammers. WAMS enables the use of WGS X and Ka-band resources to assure access to mission critical communications to provide Resilient Command, Control, and Communications (RC3) capabilities in contested/degraded environments, formerly known as Anti-Access/Area Denial (A2AD). The use of WAMS PTW on WGS will augment AEHF Extended Data Rate (XDR) services to provide the information throughput capacity necessary to support critical Command and Control capability. FY 2027 funding request includes installation of (Qty 14) WAMS Modems. Production Lead Time is 16 months until first delivery with additional modems delivered every month after until full commitment. Installation of modem is dependent of modem delivery and ship availability. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 15 of 18 P-1 Line #78 Volume 2 - 747 === page 828 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 3 / CBSP Wideband Anti-Jam Modem System (WAMS) FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CBSP Wideband Anti-Jam Modem System (WAMS) B Kits Recurring 1.1.1) CBSP Wideband Anti-Jam Modem System (WAMS) Afloat - NonOrganic - (13) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 0.000 - Subtotal: CBSP Wideband Anti-Jam Modem System (WAMS) / - - / - 22 / 9.152 / 9.152 - - 22 / 9.152 8 / 3.392 - / - - / - - / - - / - - / - - / - - / - / 3.392 - / - - / - - / - - / - - / - - / - - / - 8 / 3.392 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.000 - / 9.152 - / 3.392 - / / 0.000 - / / 0.000 - 30 / 12.544 / 12.544 - 30 / 12.544 / 12.544 - Support (All Modification Items) / - - / 0.458 - / 0.170 / - - / - / - - / - - / - - / - - / - - / 0.628 - / 0.255 - / 1.796 - / 1.463 - / 0.220 - / - - / 0.220 - / 0.021 - / - - / - - / - - / - - / 3.755 - / 0.255 - / 2.254 - / 1.633 - / 0.220 - / - - / 0.220 - / 0.021 - / - - / - - / - - / 0.000 - / 4.383 Modification Item 1 of 1: CBSP Wideband Anti-Jam Modem System (WAMS) - / 0.000 - / 0.000 - / 9.016 - / 9.198 / 0.000 - / 9.198 - / 1.340 / 0.000 - / 0.000 - / 19.554 Subtotal: Installation - / 0.000 / - - / 9.016 - / 9.198 / - - / 9.198 - / 1.340 / - - / 0.000 - / 19.554 2.1) Production Support 2.2) DSA - (14) (15) Subtotal: Support - - / - - Installation - - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 3215 - Satellite Communications Systems Navy 0.255 11.406 14.041 9.418 0.000 UNCLASSIFIED Page 16 of 18 9.418 1.361 0.000 P-1 Line #78 0.000 0.000 0.000 36.481 Volume 2 - 748 === page 829 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3215 / Satellite Communications Systems Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CBSP Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Modification Item 1 of 1: CBSP Wideband Anti-Jam Modem System (WAMS) Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 16 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jan 2025 Jan 2026 Delivery Dates May 2026 May 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CBSP Wideband Anti-Jam Modem System (WAMS) Afloat Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - FY 2025 - / - - / - FY 2026 - / - - / - - FY 2027 - / - - / - - FY 2028 - / - - / - FY 2029 - / - - FY 2030 - / - FY 2031 - To Complete Total Installation Cost - / - / - - / - - / - - / - - / - - 8 / 5.256 - 0 / 0.000 8 / 5.256 - / - - / - - / - - / - 0 / 0.000 22 / 14.272 / - 6 / 3.942 0 / 0.000 6 / 3.942 2 / 1.340 - / - - / - - / - 0 / 0.000 8 / 5.282 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.340 - / - - / - - / - 0 / 0.000 14 / 9.016 14 / 9.016 / - - 14 / 9.198 / - 0 / 0.000 14 / 9.198 / - - / - 30 / 19.554 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 7 7 4 4 3 3 1 1 - - - - - - - - - - - - - - - 30 Out - - - - - - - 7 7 4 4 3 3 1 - - - - - - - - - - - - - - 30 - 1 Footnotes: (13) Units reflect number of platforms that WAMS will be procured for and installed on. Number of WAMS will vary depending on class of ship, submarine, and shore location. Procurement costs includes Integration, Assembly and Test (IA&T) of WAMS Modems upon delivery. IA&T costs are budgeted in the year of the hardware delivery and require pre-installation integration and testing. Installation costs include LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 17 of 18 P-1 Line #78 Volume 2 - 749 === page 830 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3215 / Satellite Communications Systems ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CBSP Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: System Operational Verification Test (SOVT) engineering services and are required to deliver and install WAMS Modems. SOVT costs are tied to the end of the installation availability and verify WAMS Modem is operational. (14) (15) Production support includes the cost of production engineering, quality assurance, and acceptance test and evaluation integral to the execution of the procurement program. Design Services Allocation (DSA) consists of installation design and post installation support. Installation design work consists of Ship Check and Installation Drawings that are integral in the planning of an installation and performed 6-12 months prior to installation start. Post Installation support includes Integrated Logistics Support (ILS) updates and Ship Selected Record (SSR) updates. DSA cost fluctuates from year to year based on the number of installations and platform type. LI 3215 - Satellite Communications Systems Navy UNCLASSIFIED Page 18 of 18 P-1 Line #78 Volume 2 - 750 === page 831 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 290 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,360.708 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,360.708 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,360.708 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 63.433 57.768 0.000 57.768 82.818 80.398 76.150 162.928 162.928 162.928 - - - - - - - 63.433 57.768 0.000 57.768 82.818 80.398 76.150 To FY 2031 Complete - Total - 88.905 Continuing - Continuing - 88.905 Continuing - Continuing - - - - - - - - - 63.433 57.768 0.000 57.768 82.818 80.398 76.150 88.905 Continuing Continuing 1.355 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.934 0.319 1.112 - 1.112 1.572 0.754 1.460 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Navy Multiband Terminal (NMT) System provides funds for the procurement of ship, submarine, and shore protected and wideband Military Satellite Communications (MILSATCOM) terminals via earth orbiting relay satellites in the Super High Frequency, Ka, and Extremely High Frequency (EHF) bands. The NMT provides warfighters with the assured, jam resistant, secure SATCOM for message traffic, data transfer and secure voice communications. These procurements are scheduled to meet the satellite communications requirements established by the Chief of Naval Operations in the Fleet Communications Planning and Programming documents. Navy Multiband Terminal (NMT) is the Navy's sole protected Satellite Communications (SATCOM) terminal providing critical secure, protected, survivable and interoperable military satellite communications in support of the Naval Operational Architecture (NOA), Resilient Command, Control, and Communications (RC3), and assured strategic communications, integrating the Navy into the Joint All-Domain Command and Control (JADC2) environment. Provides simultaneous access to existing and emergent military satellites, enabling protected and wideband capabilities, increased throughput, increased bandwidth, future enhanced capabilities, and new waveforms via integrated multiband capabilities to reduce shipboard space and logistics footprint. Utilizes existing on-orbit military satellites (Milstar, WGS, UFO, Polar, DSCS, AEHF, EPS). Accommodates simultaneous (AEHF/EHF, Ka, X, and GBS) multiband capabilities to reduce the demand for ship platform space. Provides International Partner Variant (IPV) - Canada, The Netherlands, Australia, and United Kingdom. NMT directly supports key U.S. Navy operational concepts and national priorities. The NMT Service Life Extension and Modernization (SLEMOD) plan enables recurring system tech refresh and sustainment wholeness in support of warfighter priorities and includes planned RC3 capability enhancements such as Advanced Time Division Multiple Access (TDMA) Interface Processor (ATIP) Terminal Direct (TD), Wideband Anti-Jam Modem System (WAMS), and Assured Command and Control (AC2). The Wideband Anti-Jam Modem System (WAMS) is a Navy technology upgrade that enhances communication capability of shipboard and submarine NMTs by providing wideband Anti-Jam (AJ) Satellite Communication throughput over Wideband Global SATCOM (WGS). WAMS is a major contributor in supporting the National Defense Strategy by investing in resilience to provide assured communications capabilities. WAMS enables space segment Anti Jam (AJ) diversity (EHF/AEHF and WGS), thus enabling ships and submarines equipped with the modem to operate in wideband links closer to threat jammers. WAMS enables the use of WGS X and Ka-band resources to assure access to mission critical communications to provide Resilient Command, Control, and Communications (RC3) capabilities in contested/ degraded environments, formerly known as Anti-Access/Area Denial (A2AD). The use of WAMS PTW on WGS will augment AEHF Extended Data Rate (XDR) services to provide the information throughput capacity necessary to support critical Command and Control capability. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 1 of 17 P-1 Line #79 Volume 2 - 751 === page 832 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 290 This system is formally specified by both Fleet Commanders as a threshold capability for global maritime command control and communications in a Distributed Maritime Environment to execute current warfighting plans and is required for National Command and Control capability. The SATCOM Terminal is a next generational satellite communication terminal providing upgraded communication capability to the warfighter. Due to high visibility of the mission it supports, it is vital to get this capability delivered to the end Users urgently. "The Terminal" is currently a Middle Tier Acquisition (MTA) Rapid Prototyping (RP) effort. [P5 / Consolidated Prior Year Requirements]: Consolidated Prior Year Requirements includes Assurred C2 Modems (Procurement, Install, SOVT, and IA&T); NMT Ashore Terminal (Procurements, Installs, & SOVT); X/KA Backfits (Procurement, Install, SOVT, IA&T); NMT Ashore Antennas (Procurement, Install, SOVT & IA&T); NMT Afloat Sub (Procurement, Production Support, DSA, and Install); Navy Afloat Ship (HW, Production Support, DSA and Installation);ATIP SOVT & Installation; and Advanced TDMA Interface Processors (ATIP). LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 2 of 17 P-1 Line #79 Volume 2 - 752 === page 833 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 290 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Navy Multiband Terminal (NMT) / 1,307.354 - / 1.534 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 1 / NMT Service Life Extension Modernization (SLEMOD) Kits (TBD) - / 44.872 - / 26.801 - / 18.953 - / 13.976 - / 0.000 - / 13.976 P-3a 2 / Wideband Anti-Jam Modem System (WAMS) (TBD) - / 8.482 - / 35.693 - / 44.480 - / 43.792 - / 0.000 - / 43.792 P-3a 3 / SATCOM Terminal (TBD) - / 0.000 - / 98.900 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost / 1,360.708 - / 162.928 - / 63.433 - / 57.768 - / 0.000 - / 57.768 - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Navy Multiband Terminal (NMT) P-3a 1 / NMT Service Life Extension Modernization (SLEMOD) Kits (TBD) - / 29.327 - / 36.570 - / 36.920 - / 48.874 Continuing Continuing P-3a 2 / Wideband Anti-Jam Modem System (WAMS) (TBD) - / 53.491 - / 43.828 - / 39.230 - / 40.031 Continuing Continuing P-3a 3 / SATCOM Terminal (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 82.818 - / 80.398 - / 76.150 - / 88.905 Continuing - / - - / - - / - - / - - / - / 0.000 - - / - / 98.900 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding request includes funding for NMT Service Life Extension Modernization (SLEMOD) Kits procurement of 26 kits (22 Surface Afloat, 2 Sub Afloat and 2 Ashore), with integration and associated costs for pre-installation design. SLEMOD Kits provide capability sustainment and enhancements to the Fleet in order to establish system resilience while maintaining perpetual readiness. The NMT Program of Record (PoR) has been tasked with extending the lifespan of the Terminal +20 years longer than originally planned. Capability enhancement packages fielded as SLEMOD kits allow the NMT PoR to pace the threat while enhancing NMT performance and capability in order to support the Warfighter. FY 2027 funding request also includes funding for WAMS procurement of 27 units (20 Surface Afloat, 4 Sub Afloat and 3 Ashore). The FY 2027 funding request also includes the installation of 28 units (26 Surface Afloat and 2 Ashore) that were procured in FY 2026. Unit Quantities listed in WAMS Ashore are representative of each Ashore Site. Each Ashore site requires a QTY of 60 WAMS modems. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 3 of 17 P-1 Line #79 Volume 2 - 753 === page 834 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Navy Multiband Terminal (NMT) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 1.534 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 1,307.354 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,307.354 Plus CY Advance Procurement ($ in Millions) - - - - - 1.534 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 1,307.354 FY 2027 Total - - - - - 1.534 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway - Consolidated Prior Year Requirements Cost Recurring Cost 1.1.1) Consolidated Prior Year Requirements - - 1,288.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 1,288.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,288.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1) NMT Integration, Assembly & Test (IA&T) - - 7.728 - - 0.062 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) NMT System Operational Verification Test (SOVT) - - 11.316 - - 0.096 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) Navy Multiband Terminal (NMT) Installation (Ashore) - - 0.000 - - 1.376 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support - NS777 FMP Install Cost - - 19.044 - - 1.534 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 1,307.354 - - 1.534 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Flyaway Consolidated Prior Year Requirements Cost Support - NS777 FMP Install Cost LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 4 of 17 P-1 Line #79 Volume 2 - 754 === page 835 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 44.872 26.801 18.953 13.976 0.000 13.976 29.327 36.570 36.920 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 44.872 26.801 18.953 13.976 0.000 13.976 29.327 36.570 36.920 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / NMT Service Life Extension Modernization (SLEMOD) Kits - - - - - - - - - 44.872 26.801 18.953 13.976 0.000 13.976 29.327 36.570 36.920 To FY 2031 Complete 48.874 Continuing - Continuing - 48.874 Continuing - Total - Continuing - - 48.874 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: NMT SLEMOD Kits Afloat and Ashore - FY 2027 request includes funding for NMT Service Life Extension Modernization (SLEMOD) Kits procurement of 26 kits (22 Surface Afloat, 2 Sub Alfoat and 2 Ashore), with integration and associated costs for pre-installation design. SLEMOD Kits provide sustainment and capability enhancements to the Fleet in order to establish system resilience while maintaining perpetual readiness. The NMT Program of Record (PoR) has been tasked with extending the lifespan of the Terminal +20 years longer than originally planned. Capability enhancement packages fielded as SLEMOD kits allow the NMT PoR to pace the threat while enhancing NMT performance and capability in order to support the Warfighter. Decrease in quantity from FY 2026 to FY 2027 is in alignment with ship installation schedules. SLEMOD kit is comprised of hardware and software components. Integration, Assembly and Test (IA&T) and System Operational Verification Test (SOVT) engineering services are required to deliver and install the SLEMOD Kits. IA&T costs are budgeted in the year of the hardware delivery and require pre-installation integration and testing. System Operational Verification Test (SOVT) costs are tied to the end of the installation availability and verify SLEMOD Kit is operational. SLEMOD kitting includes: - NMT Assured Command and Control (AC2) Modem - Modem control migration from NMT to ATIP laptop for calibration (NMT AC2 Modem, ATIP Terminal-Direct and Wideband Anti-Jam Modem System (WAMS) enabler) - NMT Windows 10 Operating System (NMT AC2 Modem, ATIP Terminal-Direct and WAMS enabler) - ATIP Windows 10 Operating System update (NMT AC2 Modem, ATIP Terminal-Direct and WAMS enabler) - ATIP Adaptive Coding (Phase I) enhancement - ATIP Terminal-Direct (Full Adaptive Coding enabler) - ATIP Migration from Plain Text (PT) to Cypher Text (CT) - ATIP Remote Operator Interface Unit (ROIU) - NMT X-Band High Powered Amplifier (HPA) Transient Voltage Surge Suppression (TVSS) to enhance the HPA's ability to handle shipboard power fluctuations - NMT Solid State Hard Drive (SSHD) enhancement from 8GB to 32GB (NMT Windows 10 Operating System enabler) - NMT/ATIP Enhanced Bandwidth Efficient Modem (EBEM) Information Throughput Adaptation (ITA) Mode - Wideband Anti-Jam Modem System (WAMS) Spiral 1 (Racks, cabling and foundational infrastructure) (WAMS enabler) - NMT Assured Command and Control (AC2) Modem upgrade to enable NetVue capability and EBEM backwards compatibility - L-Band Beacon Receiver (LBR) update (WAMS enabler) LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 5 of 17 P-1 Line #79 Volume 2 - 755 === page 836 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NMT Service Life Extension Modernization (SLEMOD) Kits MDAP/MAIS Code: - NMT Windows 11 Operating System - NMT Remote Operator Interface Unit (ROIU) - WIN11 OS Enabler - NMT Local Operator Interface Unit (LOIU) - WIN11 OS Enabler - Next Generation (NGEN) Operator Interface Unit (OIU) to accommodate 64bit architecture - Red Interface Processor (RIP) and Black Common Control Processor (BCCP) upgrade to enhance processing capability - Ethernet Switch Fabric (ESF) update - 80 MHz time signal reference update - Obsolescence Mitigation Design Services Allocation (DSA) consists of installation design and post installation support. Installation design work consists of Ship Check and Installation Drawings that are integral in the planning of an installation and performed 6-12 months prior to installation start. Post Installation support includes Integrated Logistics Support (ILS) updates and Ship Selected Record (SSR) updates. DSA cost fluctuate from year to year based on the number of installations occurring. Production support includes the cost of production engineering, quality assurance, and acceptance test and evaluation integral to the execution of the procurement program. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 6 of 17 P-1 Line #79 Volume 2 - 756 === page 837 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NMT Service Life Extension Modernization (SLEMOD) Kits MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: NMT Service Life Extension Modernization (SLEMOD) Kits B Kits Recurring 1.1.1) NMT SLE Modernization Kit Afloat - NonOrganic 79 / 20.392 47 / 12.529 32 / 8.700 24 / 6.656 - / - 24 / 6.656 51 / 14.427 52 / 15.004 53 / 15.599 54 / 16.211 Continuing Continuing 1.1.2) NMT SLE Modernization Kit Ashore - NonOrganic 7 / 1.794 5 / 1.333 3 / 0.816 2 / 0.554 - / - 2 / 0.554 3 / 0.849 3 / 0.866 2 / 0.589 1 / 0.300 Continuing Continuing / 7.210 - / - - / 16.511 Continuing Continuing 26 / 7.210 - / - 26 / 7.210 55 / 16.511 Continuing Continuing - / - - / 7.210 / 16.511 Continuing Continuing Subtotal: Recurring / 22.186 - Subtotal: NMT Service Life Extension Modernization (SLEMOD) Kits Subtotal: Procurement, All Modification Items 86 / 22.186 / 22.186 - / 13.862 - 52 / 13.862 - - / 9.516 35 / 9.516 - / 13.862 - / 9.516 - / 7.210 / 7.210 / 15.276 - 54 / 15.276 / 15.276 - / 15.870 - 55 / 15.870 / 15.870 - / 16.188 - 55 / 16.188 / 16.188 - - - Support (All Modification Items) 2.1) NMT SLEMOD Integration, Assembly, & Test 2.2) NMT SLEMOD Production Support Afloat (1) (2) 2.3) NMT SLEMOD Kit Production Support Ashore 2.4) DSA Ship & Sub (3) (4) 2.5) NMT SLEMOD Kit SOVT Afloat and Ashore (5) 2.6) NMT Engineering Change Order Subtotal: Support - / 3.038 - / 1.450 - / 1.268 - / 0.757 - / 0.000 - / 0.757 - / 1.666 - / 1.946 - / 1.992 - / 2.062 Continuing Continuing - / 1.210 - / 0.674 - / 0.435 - / 0.324 - / 0.000 - / 0.324 - / 0.644 - / 0.763 - / 0.801 - / 0.811 Continuing Continuing - / 0.092 - / 0.067 - / 0.041 - / 0.028 - / 0.000 - / 0.028 - / 0.042 - / 0.043 - / 0.029 - / 0.015 Continuing Continuing - / 2.433 - / 0.773 - / 0.764 - / 0.472 - / 0.000 - / 0.472 - / 0.794 - / 1.202 - / 1.334 - / 1.409 Continuing Continuing - / 0.729 - / 0.456 - / 0.404 - / 0.247 - / 0.000 - / 0.247 - / 0.468 - / 0.505 - / 0.542 - / 0.543 Continuing Continuing - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 5.400 - / 5.000 - / 16.300 - / 7.502 - / 3.420 - / 2.912 - / 1.828 / - - / 1.828 - / 3.614 - / 9.859 - / 9.698 - / 21.140 Continuing Continuing / 0.000 - / 4.938 - / 10.437 - / 10.841 - / 11.034 - / 11.223 Continuing Continuing / - - / 4.938 - / 10.437 - / 10.841 - / 11.034 - / 11.223 Continuing Continuing 48.874 Continuing Continuing - - / - - / 26.700 Installation Modification Item 1 of 1: NMT Service Life Extension Modernization (SLEMOD) Kits - / 15.184 - / 9.519 - / 6.525 - / 4.938 Subtotal: Installation - / 15.184 - / 9.519 - / 6.525 - / 4.938 - Total Total Cost (Procurement + Support + Installation) LI 3216 - Navy Multiband Terminal (NMT) Navy 44.872 26.801 18.953 13.976 0.000 UNCLASSIFIED Page 7 of 17 13.976 29.327 36.570 P-1 Line #79 36.920 Volume 2 - 757 === page 838 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NMT Service Life Extension Modernization (SLEMOD) Kits MDAP/MAIS Code: Modification Item 1 of 1: NMT Service Life Extension Modernization (SLEMOD) Kits Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 2 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: Method:: Installation Name: NMT SLE Modernization Kit Afloat Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 79 / 13.821 47 / 8.506 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 47 / 8.506 32 / 5.905 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 32 / 5.905 24 / 4.516 - / - - / - - / - - / - 0 / 0.000 24 / 4.516 51 / 9.792 - / - - / - - / - 0 / 0.000 51 / 9.792 - / - - / - 0 / 0.000 52 / 10.183 - / - 0 / 0.000 53 / 10.586 Prior Years 79 / 13.821 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 79 / 13.821 47 / 8.506 24 / 4.516 32 / 5.905 0 / 0.000 24 / 4.516 0 / 0.000 24 / 4.516 52 / 10.183 51 / 9.792 53 / 10.586 52 / 10.183 54 / 10.995 - 53 / 10.586 / - 54 / 10.995 0 / 0.000 54 / 10.995 Continuing Continuing Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 79 - - 27 20 - - 16 16 - - 12 12 - - 25 26 - - 26 26 - - 26 27 - - 27 27 Cont. Cont. Out 79 - - - 47 - - - 32 - - - 24 - - - 51 - - - 52 - - - 53 - - - 54 Cont. Cont. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 8 of 17 P-1 Line #79 Q4 TC Tot Volume 2 - 758 === page 839 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / NMT Service Life Extension Modernization (SLEMOD) Kits MDAP/MAIS Code: Modification Item 1 of 1: NMT Service Life Extension Modernization (SLEMOD) Kits Installation Information Method of Implementation: Method:: Installation Name: NMT SLE Modernization Kit Ashore Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 7 / 1.363 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 1.363 FY 2025 - / - 5 / 1.013 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 1.013 FY 2026 - / - - / - 3 / 0.620 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.620 FY 2027 - / - - / - - / - 2 / 0.422 0 / 0.000 2 / 0.422 - / - - / - - / - - / - 0 / 0.000 2 / 0.422 FY 2028 - / - - / - - / - - / - - / - - / - 3 / 0.645 - / - - / - - / - 0 / 0.000 3 / 0.645 FY 2029 - / - - / - - / - - / - - / - - / - - / - 3 / 0.658 - / - - / - 0 / 0.000 3 / 0.658 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.448 - / - 0 / 0.000 2 / 0.448 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.228 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 7 / 1.363 5 / 1.013 3 / 0.620 2 / 0.422 0 / 0.000 2 / 0.422 3 / 0.645 3 / 0.658 2 / 0.448 1 / 0.228 / - Continuing Continuing 1 / 0.228 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 7 - - 3 2 - - 3 - - - 1 1 - - 2 1 - - 2 1 - - 1 1 - - 1 - Cont. Cont. Out 7 - - 5 - - - - 2 - - 1 - - - - 3 - 1 1 - - 2 1 - - - - Tot 1 Cont. Cont. Footnotes: (1) (2) (3) (4) (5) Decrease in SLEMOD Integration, Assembly, & Test (IA&T) is due to a decrease in the quantity of SLEMOD kits being procured in FY 2027 compared to FY 2026. Decrease in SLEMOD Production Support is due to a decrease in the quantity of SLEMOD kits being procured in FY 2027 compared to FY 2026. Decrease in SLEMOD Production Support is due to a decrease in the quantity of SLEMOD kits being procured in FY 2027 compared to FY 2026. Decrease in SLEMOD DSA is due to a decrease in the quantity of SLEMOD kits being procured in FY 2027 compared to FY 2026. Decrease in SLEMOD Kit SOVT is due to a decrease in the quantity of SLEMOD kits being procured in FY 2027 compared to FY 2026. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 9 of 17 P-1 Line #79 Volume 2 - 759 === page 840 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 8.482 35.693 44.480 43.792 0.000 43.792 53.491 43.828 39.230 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - 8.482 35.693 44.480 43.792 0.000 43.792 53.491 43.828 39.230 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / Wideband Anti-Jam Modem System (WAMS) - - - - - - - - - 8.482 35.693 44.480 43.792 0.000 43.792 53.491 43.828 39.230 To FY 2031 Complete 40.031 Continuing - Continuing - 40.031 Continuing - Total - Continuing - - 40.031 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Wideband Anti-Jam Modem System (WAMS) is a Navy technology upgrade that enhances communication capability of shipboard and submarine NMTs by providing wideband Anti-Jam (AJ) Satellite Communication throughput over Wideband Global SATCOM (WGS). WAMS is a major contributor in supporting the National Defense Strategy by investing in resilience to provide assured communications capabilities. WAMS enables space segment Anti-Jam (AJ) diversity (EHF/AEHF and WGS), thus enabling ships and submarines equipped with the modem to operate in wideband links closer to threat jammers. WAMS enables the use of WGS X and Ka-band resources to assure access to mission critical communications to provide Resilient Command, Control, and Communications (RC3) capabilities in contested/ degraded environments, formerly known as Anti-Access/Area Denial (A2AD). The use of WAMS PTW on WGS will augment AEHF Extended Data Rate (XDR) services to provide the information throughput capacity necessary to support critical Command and Control capability. FY 2027 funding request funding for WAMS procurement of 27 units (20 Surface Afloat,4 Sub Afloat, 3 Ashore). The FY 2027 funding request also includes the installation of 28 units (26 Surface Afloat, 2 Ashore) that were procured in FY 2026. Units reflect number of platforms that WAMS will be procured for and installed on. Number of WAMS will vary depending on class of ship, submarine, and shore location. Unit Quantities listed in WAMS Ashore are representative of each Ashore Site. Each Ashore site requires a QTY of 60 WAMS modems. Procurement costs include Integration, Assembly and Test (IA&T) of WAMS Modems upon delivery. IA&T costs are budgeted in the year of the hardware delivery and require pre-installation integration and testing. System Operational Verification Test (SOVT) engineering services are required to deliver and install WAMS Modems. SOVT costs are tied to the end of the installation availability and verify WAMS Modem is operational. Design Services Allocation (DSA) consists of installation design and post installation support. Installation design work consists of Ship Check and Installation Drawings that are integral in the planning of an installation and performed 6-12 months prior to installation start. Post Installation support includes Integrated Logistics Support (ILS) updates and Ship Selected Record (SSR) updates. DSA cost fluctuates from year to year based on the ship & number of installations occurring. Production support consists of financial, contractual, and programmatic cost associated with the production and installation of WAMS Modems. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 10 of 17 P-1 Line #79 Volume 2 - 760 === page 841 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Models of Systems Affected: Ships, submarines Prior Years Related RDT&E PEs: 0604280N Modification Type: TBD FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Wideband Anti-Jam Modem System (WAMS) B Kits Recurring 1.1.1) Wideband Anti-Jam Modem System (WAMS) Afloat- Ship - NonOrganic - / - 1.1.2) Wideband Anti-Jam Modem System (WAMS) - / - - - / - 1 / 3.598 Afloat- Sub - NonOrganic (6) 1.1.3) Wideband Anti-Jam Modem System (WAMS) Ashore - NonOrganic Subtotal: Recurring / 0.000 - Subtotal: Wideband Anti-Jam Modem System (WAMS) Subtotal: Procurement, All Modification Items - / / 0.000 - 56 / 23.296 / - / 26.894 - 57 / 26.894 / 26.894 - 22 / 9.335 20 / 8.656 - / - 20 / 8.656 39 / 17.217 15 / 6.754 18 / 8.267 40 / 18.739 Continuing Continuing / - 4 / 1.731 - / - 4 / 1.731 5 / 2.207 6 / 2.702 6 / 2.756 6 / 2.811 Continuing Continuing 2 / 7.346 3 / 11.247 - / - 3 / 11.247 3 / 11.478 2 / 7.811 1 / 3.986 - - / 16.681 - 24 / 16.681 / 16.681 - / 21.634 - / - - 27 / 21.634 - / - 27 / 21.634 / 21.634 - / - - - - / 21.634 / 21.634 / 30.902 - 47 / 30.902 / 30.902 - / 17.267 - 23 / 17.267 / 17.267 - / 15.009 - 25 / 15.009 / 15.009 - / - - / - 12 / 45.466 / 21.550 Continuing Continuing 46 / 21.550 Continuing Continuing / 21.550 Continuing Continuing - - Support (All Modification Items) 2.1) Wideband Anti-Jam Modem System (WAMS) NRE (7) - 2.2) Wideband Anti-Jam Modem System (WAMS) Sub Integration NRE 2.3) DSA (8) (9) 2.4) Production Support Afloat & Ashore 2.5) SOVT Afloat, Submarine, and Ashore (10) Subtotal: Support / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.482 - / 8.482 / - - - / 3.211 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.211 - / - - / 4.243 - / 3.315 - / 3.286 - / - - / 3.286 - / 3.967 - / 2.562 - / 3.355 - / 4.635 Continuing Continuing - / - - / 1.345 - / 0.921 - / 1.094 - / - - / 1.094 - / 1.510 - / 0.838 - / 0.766 - / 1.077 Continuing Continuing - / - / - - / 0.357 - / 0.327 - / - - / 0.327 - / 0.297 - / 0.345 - / 0.303 - / 0.290 Continuing Continuing - / 4.593 - / 4.707 - / - - / 4.707 - / 5.774 - / 3.745 - / 4.424 - / 6.002 Continuing Continuing - - / 8.482 - / 8.799 Modification Item 1 of 1: Wideband Anti-Jam Modem System (WAMS) - / 0.000 - / 0.000 - / 23.206 - / 17.451 Subtotal: Installation - / 0.000 / - - / 23.206 - / 17.451 Installation - - / 0.000 - / 17.451 - / 16.815 - / 22.816 - / 19.797 - / 12.479 Continuing Continuing / - - / 17.451 - / 16.815 - / 22.816 - / 19.797 - / 12.479 Continuing Continuing 40.031 Continuing Continuing - Total Total Cost (Procurement + Support + Installation) LI 3216 - Navy Multiband Terminal (NMT) Navy 8.482 35.693 44.480 43.792 0.000 UNCLASSIFIED Page 11 of 17 43.792 53.491 43.828 P-1 Line #79 39.230 Volume 2 - 761 === page 842 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Modification Item 1 of 1: Wideband Anti-Jam Modem System (WAMS) Manufacturer Information Manufacturer Name: L3 Harris Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 16 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates May 2026 May 2027 May 2028 May 2028 May 2029 May 2030 May 2031 Installation Information Method of Implementation: Method:: Installation Name: Wideband Anti-Jam Modem System (WAMS) Afloat - Ship Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 9 / 4.896 FY 2028 - / - - / - - / - - / - - / - - / - - / - 19 / 10.545 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - Total - / - - / - Installation Cost - / - - 41 / 21.456 41 / 21.456 / - - / - - / - - / - - / - - 15 / 8.007 / - 0 / 0.000 - 15 / 8.007 - / - - / - - / - - / - 0 / 0.000 56 / 29.463 11 / 5.874 0 / 0.000 11 / 5.874 - / - - / - - / - 0 / 0.000 22 / 11.863 11 / 6.105 - / - - / - 0 / 0.000 20 / 11.001 - / - 0 / 0.000 39 / 21.865 7 / 3.962 8 / 4.616 0 / 0.000 / - - / - 9 / 5.193 Continuing - / - - / - - / - Continuing - / - - / - - / - 26 / 13.881 / - 0 / 0.000 11 / 5.989 26 / 13.881 20 / 10.885 20 / 11.320 30 / 16.650 27 / 15.282 / - - 17 / 9.809 - / - 15 / 8.578 Continuing Continuing / - - Continuing / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 20 21 15 - 5 6 11 - 4 5 11 - 9 10 20 - 3 4 8 - 4 5 49 210 Out - - - - - - - - 20 21 15 5 6 11 4 5 11 9 10 20 3 4 4 54 210 LI 3216 - Navy Multiband Terminal (NMT) Navy - - UNCLASSIFIED Page 12 of 17 - P-1 Line #79 - 8 - Volume 2 - 762 === page 843 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Modification Item 1 of 1: Wideband Anti-Jam Modem System (WAMS) Installation Information Method of Implementation: Method:: Installation Name: Wideband Anti-Jam Modem System (WAMS) Afloat - Sub Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 4 / 0.468 - / - - / - - / - 0 / 0.000 4 / 0.468 FY 2028 - / - - / - - / - - / - - / - - / - - / - 5 / 0.595 - / - - / - 0 / 0.000 5 / 0.595 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.726 - / - 0 / 0.000 6 / 0.726 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.738 0 / 0.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 4 / 0.468 Installation Cost 5 / 0.595 6 / 0.726 Continuing - 6 / 0.738 6 / 0.738 Continuing / - - Continuing / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - 2 2 - - 2 3 - - 3 3 - - 3 3 6 27 Out - - - - - - - - - - - - - - - 3 9 27 - 2 2 - - 2 3 - - 3 3 - - Method of Implementation: Method:: Installation Name: Wideband Anti-Jam Modem System (WAMS) Ashore Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 1.750 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 1.750 FY 2026 - / - - / - - / - 2 / 3.570 0 / 0.000 2 / 3.570 - / - - / - - / - - / - 0 / 0.000 2 / 3.570 FY 2027 - / - - / - - / - - / - - / - - / - 3 / 5.462 - / - - / - - / - 0 / 0.000 3 / 5.462 FY 2028 - / - - / - - / - - / - - / - - / - - / - 3 / 5.571 - / - - / - 0 / 0.000 3 / 5.571 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 3.789 - / - 0 / 0.000 2 / 3.789 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.932 0 / 0.000 1 / 1.932 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - - Installation Cost LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 13 of 17 P-1 Line #79 / - / - / - - / - / - Volume 2 - 763 === page 844 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Wideband Anti-Jam Modem System (WAMS) MDAP/MAIS Code: Modification Item 1 of 1: Wideband Anti-Jam Modem System (WAMS) Installation Information Method of Implementation: Method:: Installation Name: Wideband Anti-Jam Modem System (WAMS) Ashore Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - Total - / - - / - 1 / 1.750 Installation Cost / - - / - - 2 / 3.570 / - - 0 / 0.000 / - - 2 / 3.570 / - - 3 / 5.462 / - - 3 / 5.571 / - - 2 / 3.789 / - - 1 / 1.932 / - - 0 / 0.000 / - 12 / 22.074 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 1 - - - 1 1 - - 2 1 - - 2 1 - - 1 1 - - 1 - - 12 Out - - - - - - - - - - 12 - 1 - 1 1 - - 2 1 - - 2 1 - - 1 1 - - 1 Footnotes: (6) In FY 2025, based on fleet requirements, ten (10) WAMS procurement quantities were shifted from Submarine to Afloat platforms. This was a net zero quantity adjustment between platforms to best support the Fleet Warfighter. (7) WAMS Non-Recurring Engineering (NRE) efforts are required to engineer a common SHIPBOARD suite for WAMS infrastructure throughout the Fleet. NRE supports stand-up of a Government integration, assembly and test facility to facilitate commonality across various surface ship architecture configurations throughout the Navy. (8) (9) WAMS Sub Integration Non-Recurring Engineering was required in FY 2025 to engineer a Common Submarine Radio Room for WAMS infrastructure throughout the Fleet. Design Services Allocation (DSA) consists of installation design and post installation support. Installation design work consists of Ship Check and Installation Drawings that are integral in the planning of an installation and performed 6-12 months prior to installation start. Post Installation support includes Integrated Logistics Support (ILS) updates and Ship Selected Record (SSR) updates. DSA cost fluctuates from year to year based on the ship & number of installations occurring. Increase in WAMS DSA is due to an increase in the quantity of WAMS Surface Afloat and Ashore being procured in FY 2027 compared to FY 2026. (10) System Operational Verification Test (SOVT) engineering services are required to deliver and install WAMS Modems. SOVT costs are tied to the end of the installation availability and verify WAMS Modems is operational. Decrease in WAMS SOVT is due to a decrease in the quantity of WAMS Surface Afloat installations in FY 2027 compared to FY 2026. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 14 of 17 P-1 Line #79 Volume 2 - 764 === page 845 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.000 98.900 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 98.900 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete Total - - - - - - - - - - - - 0.000 98.900 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 98.900 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / SATCOM Terminal - - - - - - - - - - - - 0.000 98.900 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 98.900 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Beginning in FY 2026, SATCOM Terminals was realigned from OPN BLI 3216 to OPN BLI 3222 Mobile Advanced EHF Terminal (MAT), which is classified SECRET/NOFORN and submitted annually to Congress in the classified budget Justification books. Funding remains under BLI 3216 for FY 2025. SATCOM Terminal is a next generational satellite communication terminal providing upgraded communication capability to the warfighter. Due to the high visibility of the mission that it supports, it is vital to get to this capability delivered to the end Users urgently. The SATCOM Terminal is currently a Middle Tier Acquisition (MTA) Rapid Prototyping (RP) effort. Integration, Assembly and Test (IA&T) costs are budgeted in the year of hardware delivery and require integration of multiple HW components and testing prior to delivery to the user. Production support consists of financial, contractual, and programmatic cost associated with the production of SATCOM terminals. SATCOM Terminals are turn-key and therefore do not have installation costs associated with them. LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 15 of 17 P-1 Line #79 Volume 2 - 765 === page 846 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / SATCOM Terminal MDAP/MAIS Code: Models of Systems Affected: TBD Modification Type: TBD Prior Years FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: SATCOM Terminal B Kits Recurring 1.1.1) SATCOM Terminal - Organic - (11) Subtotal: Recurring Subtotal: SATCOM Terminal - Subtotal: Procurement, All Modification Items / / 0.000 - / / 0.000 - 11 / 89.100 - / - - / - - / - - / - - / - - / - - / - - / - / 89.100 - / - - / - - / - - / - - / - - / - - / - - / - 11 / 89.100 - / - - / - - / - - / - - / - - / - - / - - / - / 89.100 - / - - / - - / - - / - - / - - / - - / - - / - - - - / / 0.000 - / / 0.000 - 11 / 89.100 / 89.100 - 11 / 89.100 / 89.100 - Support (All Modification Items) 2.1) Integration, Assembly, and Test (IA&T) 2.2) Production Support (12) (13) Subtotal: Support - / - - / 4.214 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.214 - / - - / 5.586 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.586 / 0.000 - / 9.800 - / - - / - - / - - / - - / - - / - - / - - / - / 0.000 - / 9.800 / - - / - - / - - / - - / - - / - - / - - / - - / - - - Installation Subtotal: Installation - / - - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 3216 - Navy Multiband Terminal (NMT) Navy 0.000 98.900 0.000 0.000 0.000 UNCLASSIFIED Page 16 of 17 0.000 0.000 0.000 P-1 Line #79 0.000 0.000 0.000 98.900 Volume 2 - 766 === page 847 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3216 / Navy Multiband Terminal (NMT) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / SATCOM Terminal MDAP/MAIS Code: Modification Item 1 of 1: SATCOM Terminal Manufacturer Information Manufacturer Name: RAYTHEON Manufacturer Location: Marlborough, MA (14) Administrative Leadtime (in Months): 5 Dates FY 2025 Contract Dates Mar 2025 Delivery Dates Dec 2026 Production Leadtime (in Months): 21 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Footnotes: (11) Beginning in FY 2026, SATCOM Terminals realigned from OPN BLI 3216 to OPN BLI 3222 Mobile Advanced EHF Terminal (MAT), which is classified SECRET/NOFORN and submitted annually to Congress in the classified budget Justification books. Funding remains under BLI 3216 for FY 2025. SATCOM Terminals are turn-key and therefore do not have installation costs associated with them. (12) Integration, Assembly, and Test: Beginning in FY 2026, SATCOM Terminals realigned from OPN BLI 3216 to OPN BLI 3222 Mobile Advanced EHF Terminal (MAT), which is classified SECRET/NOFORN and submitted annually to Congress in the classified budget Justification books. Funding remains under BLI 3216 for FY 2025. (13) Production Support: Beginning in FY 2026, SATCOM Terminals realigned from OPN BLI 3216 to OPN BLI 3222 Mobile Advanced EHF Terminal (MAT), which is classified SECRET/NOFORN and submitted annually to Congress in the classified budget Justification books. Funding remains under BLI 3216 for FY 2025. (14) Production Lead Time includes Long Lead Material that will be incorporated into the end item terminal LI 3216 - Navy Multiband Terminal (NMT) Navy UNCLASSIFIED Page 17 of 17 P-1 Line #79 Volume 2 - 767 === page 848 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 768 === page 849 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3222 / Mobile Advanced EHF Terminal (MAT) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 0.000 0.000 21.860 17.753 17.923 18.286 - - - 0.000 0.000 - - 0.000 0.000 220.453 220.453 220.453 202.305 202.305 202.305 0.000 0.000 0.000 202.305 202.305 202.305 To FY 2031 Complete - - - - - 21.860 17.753 17.923 18.286 - - - - - - 21.860 17.753 17.923 18.286 - Total 498.580 498.580 498.580 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3222 - Mobile Advanced EHF Terminal (MAT) Navy UNCLASSIFIED Page 1 of 5 P-1 Line #80 Volume 2 - 769 === page 850 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 13: Satellite Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3222 / Mobile Advanced EHF Terminal (MAT) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Mobile Advanced EHF Terminal (MAT) (TBD) - / 0.000 - / 0.000 - / 220.453 - / 202.305 - / 0.000 - P-40 Total Gross/Weapon System Cost - / 0.000 - / 0.000 - / 220.453 - / 202.305 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 202.305 / 202.305 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / Mobile Advanced EHF Terminal (MAT) (TBD) - / 21.860 - / 17.753 - / 17.923 - / 18.286 P-40 Total Gross/Weapon System Cost - / 21.860 - / 17.753 - / 17.923 - / 18.286 - / 0.000 - / 498.580 / - - / 498.580 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3222 - Mobile Advanced EHF Terminal (MAT) Navy UNCLASSIFIED Page 2 of 5 P-1 Line #80 Volume 2 - 770 === page 851 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3222 / Mobile Advanced EHF Terminal (MAT) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Mobile Advanced EHF Terminal (MAT) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 0.000 0.000 21.860 17.753 17.923 18.286 0.000 - - 0.000 0.000 - - 0.000 0.000 220.453 220.453 220.453 202.305 202.305 202.305 0.000 0.000 0.000 202.305 202.305 202.305 To FY 2031 Complete - - - - - 21.860 17.753 17.923 18.286 0.000 - - - - - 21.860 17.753 17.923 18.286 0.000 Total 498.580 498.580 498.580 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3222 - Mobile Advanced EHF Terminal (MAT) Navy UNCLASSIFIED Page 3 of 5 P-1 Line #80 Volume 2 - 771 === page 852 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3222 / Mobile Advanced EHF Terminal (MAT) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Mobile Advanced EHF Terminal (MAT) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Mobile Advanced EHF Terminal (MAT) B Kits Recurring 1.1.1) Mobile Advanced EHF TERMINAL - Organic Subtotal: Recurring - (1) - Subtotal: Mobile Advanced EHF Terminal (MAT) Subtotal: Procurement, All Modification Items - / - - / - - / 220.453 - / 202.305 - / - - / 202.305 - / 21.860 - / 17.753 - / 17.923 - / 18.286 / 0.000 - / - - / 220.453 - / 202.305 - / - - / 202.305 - / 21.860 - / 17.753 - / 17.923 - / 18.286 / - - / - - / 220.453 - / 202.305 - / - - / 202.305 - / 21.860 - / 17.753 - / 17.923 - / 18.286 / 0.000 - / - - / 220.453 - / 202.305 - / - - / 202.305 - / 21.860 - / 17.753 - / 17.923 - / 18.286 / - - / - - / - - / - - 0.000 220.453 0.000 202.305 - / - - / 498.580 / 0.000 - / 498.580 / - - / 498.580 / 0.000 - / 498.580 Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - 0.000 498.580 Total Total Cost (Procurement + Support + Installation) LI 3222 - Mobile Advanced EHF Terminal (MAT) Navy 0.000 202.305 UNCLASSIFIED Page 4 of 5 21.860 17.753 P-1 Line #80 17.923 18.286 Volume 2 - 772 === page 853 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 13 P-1 Line Item Number / Title: 3222 / Mobile Advanced EHF Terminal (MAT) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Mobile Advanced EHF Terminal (MAT) MDAP/MAIS Code: Modification Item 1 of 1: Mobile Advanced EHF Terminal (MAT) Footnotes: (1) The details of this Budget Line Item are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. LI 3222 - Mobile Advanced EHF Terminal (MAT) Navy UNCLASSIFIED Page 5 of 5 P-1 Line #80 Volume 2 - 773 === page 854 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 774 === page 855 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 14: Shore Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3302 / Joint Communications Support Element (JCSE) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 50.151 4.551 3.389 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 50.151 4.551 3.389 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 50.151 4.551 3.389 0.000 0.000 0.000 0.000 0.000 0.000 To FY 2031 Complete 0.000 Continuing - Continuing - 0.000 Continuing - Total - Continuing - - 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aligned under Joint Enabling Capabilities Command (JECC), U.S. Transportation Command (USTRANSCOM) - Joint Communications Support Element (JCSE) is the only Department of War (DoW) organization specifically formed that provides crisis and contingency communications to meet the operational support needs of the Joint Chiefs of Staff (JCS), Combatant Commands (CC), DoW agencies and non-DoW agencies. The mission of JCSE is to provide rapidly deployable, en route, early entry, and scalable coalition command, control, computers, intelligence, surveillance, and reconnaissance (C4ISR) capabilities to CCs and other agencies as directed to facilitate rapid establishment and transitions of Joint Forces Headquarters (JFHQ), and bridge joint communications requirements. JCSE seamlessly scales C4ISR support for conventional or unconventional JFHQs. JCSE has a robust 24/7 reach back capability through its Global Enterprise Network and has access to a full range of DoW and commercial networks. The Vice Director through Director Joint Staff Memorandum (DJSM) 0148-20, directs Services to fund 1/3 share of the JCSE Modernization Program. This is essential for JCSE to maintain mission readiness to meet directed capabilities within Chairman's Joint Chief of Staff Instruction (CJCSI 3110.10G & 5131.10) as well as Joint Publication 6-0. The modernization program is a key component that allows JCSE to rapidly acquire current technology and configure it for DoW use to remain ready, relevant, and agile for crisis and contingency. JCSE's Modernization Program is based on CC and Service Components requirements and emerging technologies. The Services influence JCSEs spending plan through recommendations in concert with Major Defense Acquisition Program (MDAP) schedules, ensuring the Service investments meet Joint Service Requirements. LI 3302 - Joint Communications Support Element (JC... Navy UNCLASSIFIED Page 1 of 3 P-1 Line #81 Volume 2 - 775 === page 856 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 14: Shore Communications ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3302 / Joint Communications Support Element (JCSE) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Joint Communications Support Element - / 50.151 - / 4.551 - / 3.389 P-40 Total Gross/Weapon System Cost - / 50.151 - / 4.551 - / 3.389 - / / 0.000 - / / 0.000 - / / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 decrease shows realignment of funds across the FYDP out of Navy to be placed in Air Force program requirements. The JCSE's Modernization Program is aligned with the DoWs efforts on Combined All Domain Command and Control (CJADC2) through resilient transport, resilient networking, and Zero-Trust. FY27 base funding procures capabilities for narrowband, wide band and protected satellite communications (SATCOM) terminals and systems, tactical radios, terrestrial communications systems, and satellite hubs. Funding also procures networking elements, virtual appliances, Video Teleconferencing (VTC) capabilities, alternative power solutions, airborne/en route, forced entry, cyber security, Denied, Degraded C2 Environments (D2C2E), and mobile joint C2 requirements. Advancements in technology, especially in commercial off-the-shelf solutions continue to provide opportunities to modernize JCSEs equipment sets with enhanced capabilities to support delayed/Disconnected Intermittent Low Bandwidth (DDIL) and zero trust capabilities with the smallest footprint, enhanced cyber security, reduced operations and maintenance costs and seamless integration with the Department of Defense Information Network (DODIN) and the Joint Information Environment (JIE). To consistently deliver state of the art technology solutions to meet emergent Combatant Command (CC) operational communications requirements, JCSE relies on the Modernization Program as outlined in Director, Joint Staff Memorandum (DJSM) 0148-20 whereby services are mandated to apportion and program procurement funds each year to support JCSE's Modernization Program. Per Defense Planning Guidance and DJSM 0148-20, the Navy agreed to fund JCSEs validated Modernization Program. JCSE's Modernization Program is based on CC and Service Components requirements and emerging technologies. The Services influence JCSEs spending plan through recommendations in concert with Major Defense Acquisition Program (MDAP) schedules, ensuring the Service investments meet Joint Service Requirements. Each year, JCSE produces an Annual Modernization Plan in compliance with the DJSM 0148-20 and JECC hosts a Semi-Annual Modernization Program Review for the Joint Staff, Services and CC representatives. The semi-annual program review provides transparency to all of DoW on the status of procurement and the projects that JCSE is working on. Each month, procurement status reports are submitted to United States Transportation Command, who holds overall responsibility for the JCSE Modernization Program. This line funds the Department of the Navy portion of the total JCSE Modernization Program. This program is jointly funded by Army, Navy, and Air Force. LI 3302 - Joint Communications Support Element (JC... Navy UNCLASSIFIED Page 2 of 3 P-1 Line #81 Volume 2 - 776 === page 857 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3302 / Joint Communications Support Element (JCSE) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 14 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ K) Qty (Each) Aggregated Items Title: Joint Communications Support Element FY 2027 Base Total Cost ($ M) Unit Cost ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) 1) Joint Communications Support Element Modernization 1.1) Joint Communications Support Element A - - 50.151 - - 4.551 - - 3.389 - - - - - - - - - Subtotal: 1) Joint Communications Support Element Modernization - - 50.151 - - 4.551 - - 3.389 - - - - - - - - - Total - - 50.151 - - 4.551 - - 3.389 - - - - - - - - - Modernization (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Quantities are not shown. Quantities and equipment type are determined by the Combatant Command (COCOM) on an annual basis based on Joint Task Force and Joint Special Operations Task Force operational requirements for critical communications. LI 3302 - Joint Communications Support Element (JC... Navy UNCLASSIFIED Page 3 of 3 P-1 Line #81 Volume 2 - 777 === page 858 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 778 === page 859 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Program Elements for Code B Items: N/A Other Related Program Elements: 0303140N, 0305327N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2,655.428 2,655.428 2,655.428 187.188 187.188 187.188 191.239 191.239 191.239 349.099 - 0.000 - 349.099 - 0.000 - 349.099 0.000 349.099 349.099 349.099 157.060 157.060 157.060 161.809 161.809 161.809 162.210 162.210 162.210 To FY 2031 Complete 165.548 Continuing 165.548 Total - Continuing Continuing - Continuing - - Continuing Continuing 1.360 Continuing Continuing 165.548 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.890 0.054 0.867 - 0.867 0.703 0.740 1.465 Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Information Systems Security Program (ISSP) ensures the protection of Navy and joint cyberspace systems from exploitation and attacks. Systems include wired and wireless telecommunications systems, cybersecurity systems, and the content processed, stored, or transmitted therein. ISSP includes protection of the Navy's National Security Systems (NSS). The rapid change in the underlying commercial and government cyber infrastructures makes cybersecurity an increasingly complex and dynamic problem. ISSP provides the Navy's warfighter the essential information trust characteristics of availability, confidentiality, integrity, authentication, and non-repudiation. Cybersecurity capabilities must evolve quickly to meet the rapidly evolving threats and vulnerabilities. Programs within the ISSP budget include: Public Key Infrastructure (PKI): PKI implements a secure infrastructure for the generation, management, and delivery of digital certificates for secure electronic transactions, hardware certificate-based two-way authentication to networks, applications, web servers, and secure email. PKI equipment includes: Navy Certificate Validation Infrastructure (NCVI) Secret Internet Protocol Router Network (SIPRNet) & NonClassified Internet Protocol Router Network (NIPRNet) hardware/software, and hardware token product end items. Navy Cyber Situational Awareness (NCSA): NCSA is a command and control infrastructure that provides Navy commanders with timely, trusted, and comprehensive Situational Awareness (SA) of the cyberspace domain to include tailored, near real-time visualization of network health, vulnerabilities, and operational readiness through the correlation of data from multiple sources. NCSA enables early threat detection and timely decision making. The NCSA software suite includes the Navy Commander's Cyber Dashboard (NCCD), a single view into the platform's cyber readiness, providing better visibility into Information Warfare readiness trends and drivers, as well as current cyber risk to mission; this view is provided by the Readiness Analytics and Visualization Environment (RAVEN) capability. RAVEN is a visualization capability that ingests a variety of readiness and cybersecurity inputs to create visual dashboards. NCSA implements hybrid cloud based modernized Navy Big Data Platform (BDP) instances, including pre-production development and operational instances, that enable data sharing between Navy DCO data and analytics fabric and joint DCO and cyber situational awareness systems as described in the Joint Cyber Warfighting Architecture (JCWA). NCSA ashore systems will enable Navy commanders to monitor, assess, plan, and direct Navy networks to provide a high-level of confidence that operational missions can be executed as planned in adverse cyber conditions. Cyber SA will be provided via web-accessible services generated from a primary core suite fielded at Navy Cyber Defense Operations Command (NCDOC). Visualizations and analytics will be customized based on end user needs, shareable and tailorable between different end users. End users include Fleet Cyber Command/Commander Tenth Fleet (FCC/C10F), Fleet Maritime Operations Centers (MOCs), NCDOC, and Navy Network Warfare Command (NNWC). NCSA procures equipment to collect, curate, analyze, and visualize maritime operations critical for providing Navy commanders with timely, trusted, and comprehensive SA of the cyberspace domain; Data as a Service (DaaS) which provides the ability to ingest disparate data from numerous data sources; analytics suite of software and logic to integrate and translate the data ingested by the DaaS component; visualization/user interface to display cyber SA data that are relevant to the unique needs LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 1 of 39 P-1 Line #82 Volume 2 - 779 === page 860 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Program Elements for Code B Items: N/A Other Related Program Elements: 0303140N, 0305327N Line Item MDAP/MAIS Code: N/A of the Cyber Commander and for display via common visual services; as well as equipment for platforms conducting Ballistic Missile Defense (BMD) and other mission requirements (details held at a higher classification). The data that is collected and analyzed via SHARKCAGE will be presented and visualized via the NCSA capability. Computer Network Defense (CND): The CND afloat capability will remain until all systems have transitioned to Consolidated Afloat Networks and Enterprise Services (CANES). CND afloat Operating System Environment (OSE) includes host-based protection tools, system vulnerability tools, cyber remediation tools, supporting hardware and software for Department of War (DoW) mandated tools, enhanced data correlation tools, switches, ancillary devices and other related security tools. CND ashore provides capabilities to secure the Cyber Domain. CND is a set of processes and protective measures that use computer networks to detect, monitor, protect, analyze, and defend against network infiltrations resulting in service/network denial, degradation and disruptions. CND enables a government or military institute/ organization to defend against network attacks perpetrated by malicious or adversarial computer systems or networks. The Fixed Submarine Broadcast System (FSBS) includes the Nuclear Command, Control, and Communications Navy (NC3-N) requirements (details held at a higher classification). Navy Cryptography (Crypto): Navy Crypto modernizes legacy cryptographic equipment which includes families of Communications Security (COMSEC) and Transmission Security (TRANSEC) devices that are divided into crypto voice, crypto data, crypto products and associated ancillary devices. These devices provide modern cryptographic solutions to replace obsolete, legacy devices within the crypto categories in order to meet mandated National Security Agency (NSA) cease key dates for modernized encryption. Advanced Cryptographic Capabilities (ACC), will provide NSA mandated cryptographic security software modernization of various communications security devices by cease key dates (details held at a higher classification). Cryptographic Modernization (CM) and Cryptographic Modernization 2 (CM2) provides NSA mandated cryptographic modernization of various communications security devices (details held at a higher classification). Key Management (KM): KM is a combination of Tier 1 Key Management Infrastructure (KMI), Tier 2 security equipment, and Tier 3 equipment and software for key distribution and loading into End Cryptographic Units (ECUs). KMI is a single, automated, network-accessible, electronic based infrastructure that focuses on delivery of electronic key material. It provides Net Centric operations that are reliable, timely, and secure for COMSEC material management. KMI also provides the means for secure ordering, generation, production, distribution, management, and auditing of secure key of cryptographic products. SHARKCAGE: SHARKCAGE is the U.S. Navy's Defensive Cyberspace Operations (DCO) analysis enclave and means to achieve cyberspace detection-in-depth for maritime forces afloat and ashore. SHARKCAGE is the mechanism by which units, groups, and fleets will gain an Attack Sensing and Warning (AS&W) capability and how Commander, Task Force 1020/Navy Cyber Defense Operations Command (NCDOC) will achieve unity of effort and economy of force across the Navy's DCO forces. SHARKCAGE is a Navy-specific platform to complement where existing and future theater, joint, and national capabilities are insufficient for detection of adversary activities onboard maritime warfighting platforms that are located at the tactical-edge and distributed across the globe. The data that is collected and analyzed via SHARKCAGE will be presented and visualized via the NCSA capability. The FY 2025 spend plan amount for Other Procurement, Navy includes $187,188 thousand of discretionary and $7,875 thousand of mandatory (reconciliation) for a total of $195,063 thousand. [P5 / CND - Train-the-Trainer]: Funding provided to transition initial training (train the trainer) to an approved solution at the schoolhouses. [P3A - 4 / Key Load Device]: Formerly known as Simple Key Loader (SKL), the nomenclature changed to Key Load Devices to account for all devices including Tactical Key Loader (TKL), Simple Key Loader (SKL) and the Next Generation Load Device (NGLD) which will replace legacy systems. [P3A - 5 / Key Load Device]: Formerly known as SKL, the nomenclature changed to Key Load Devices to account for all devices including TKL, SKL, NGLD which will replace legacy systems. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 2 of 39 P-1 Line #82 Volume 2 - 780 === page 861 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Program Elements for Code B Items: N/A Other Related Program Elements: 0303140N, 0305327N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Info Systems Security Program (ISSP) P-3a 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) (Various) P-3a 2 / Navy Cryptography (Crypto) - Afloat (DA071) (Various) P-3a P-3a Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,315.600 - / 4.905 - / 4.870 - / 354.052 - / 27.717 - / 27.688 - / 350.803 - / 57.876 - / 58.188 3 / Navy Cryptography (Crypto) - Ashore (DA071) (Initial) - / 265.766 - / 53.452 - / 56.369 - 4 / Key Management (KM) - Afloat (DA005) (Various) - / 105.649 - / 7.447 - / 7.140 - P-3a 5 / Key Management (KM) - Ashore (DA005) (Various) - / 73.754 - / 5.767 - / 5.841 P-3a 6 / SHARKCAGE - Afloat (DA070) (Initial) - / 126.718 - / 13.319 - / 14.571 P-3a 7 / SHARKCAGE - Ashore (DA070) (Various) P-40 Total Gross/Weapon System Cost - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 4.827 - / 0.000 - / 4.827 - / 24.109 - / 0.000 - / 24.109 - / 139.995 - / 0.000 - / 139.995 / 138.480 - / 0.000 - / 8.838 - / 0.000 - - / 5.384 - / 0.000 - / 5.384 - / 11.106 - / 0.000 - / 11.106 / 138.480 / 8.838 / 63.086 - / 16.705 - / 16.572 - / 16.360 - / 0.000 - / 16.360 / 2,655.428 - / 187.188 - / 191.239 - / 349.099 - / 0.000 - / 349.099 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Info Systems Security Program (ISSP) P-3a 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) (Various) P-5a - / 27.465 - / 28.165 - / 29.037 - / 29.877 Continuing Continuing P-3a 2 / Navy Cryptography (Crypto) - Afloat (DA071) (Various) - / 41.301 - / 40.827 - / 41.510 - / 42.525 Continuing Continuing P-3a 3 / Navy Cryptography (Crypto) - Ashore (DA071) (Initial) - / 37.396 - / 37.977 - / 38.540 - / 39.200 Continuing Continuing P-3a 4 / Key Management (KM) - Afloat (DA005) (Various) - / 9.186 - / 10.753 - / 11.001 - / 11.254 Continuing Continuing P-3a 5 / Key Management (KM) - Ashore (DA005) (Various) - / 4.495 - / 4.848 - / 4.007 - / 4.086 Continuing Continuing P-3a 6 / SHARKCAGE - Afloat (DA070) (Initial) - / 15.871 - / 17.586 - / 15.964 - / 17.335 Continuing Continuing P-3a 7 / SHARKCAGE - Ashore (DA070) (Various) - / 16.639 - / 17.089 - / 17.775 - / 17.059 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 157.060 - / 161.809 - / 162.210 - / 165.548 Continuing Continuing - / - - / - - / - - / - - / - - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports the following efforts: P3a / Computer Network Defense (CND) - (22) Ashore Systems (DA070): Various equipment to secure Navy Ashore networks, i.e., hardware and software such as host-based protection tools, Department of War (DoW) mandated cyber security tools, cyber security capabilities, servers, laptops, ancillary devices and CND Deployer Toolkits (CDTs). P3a / Navy Cryptography (Crypto) - Afloat (DA071): (178) In-Line Network Encryptors (INE) (Organic), (72) Cryptographic Modernization (CM) (Organic); (197) Cryptographic Modernization 2 (CM2) (Organic) FY27 increase ($81.807M) supports Cryptographic Modernization procurements. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 3 of 39 P-1 Line #82 Volume 2 - 781 === page 862 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Program Elements for Code B Items: N/A Other Related Program Elements: 0303140N, 0305327N Line Item MDAP/MAIS Code: N/A P3a / Navy Cryptography (Crypto) - Ashore (DA071): (73) Cryptographic Modernization (CM), (197) Cryptographic Modernization 2 (CM2); FY27 increase ($82.111M) supports Cryptographic Modernization procurements. P3a / Key Management (KM) - Afloat (DA005): (230) Key Load Device, (49) KMI NSA Mandated Updates; FY27 increase ($1.698M) is required for Key Loader Device to replenish the fleet with key-fill devices required to conduct secure, mission-critical communications. Quantities fluctuate to remain within the Inventory Objective Capability (IOC). P3a / Key Management (KM) - Ashore (DA005): (28) Key Management Infrastructure (KMI) NSA Mandated Updates, (304) Key Load Device; FY27 decrease ($0.457M) is required for Key Loader Device to replenish the fleet with key-fill devices required to conduct secure, mission-critical communications. Quantities fluctuate to remain within the Inventory Objective Capability (IOC). P3a / SHARKCAGE - Afloat (DA070): (8) SHARKCAGE Afloat Suites. P3a / SHARKCAGE - Ashore (DA070): (3) SHARKCAGE Analytic Suite 2.0. P5 / Public Key Infrastructure (PKI): (10) PKI systems (DA018). P5 / Navy Cyber Situational Awareness (NCSA): Procurement, installation, and support costs of (1) NCSA Suite (DA070). Supports annual SWP capability release to meet fleet requirements. P5 / Computer Network Defense (CND) Afloat (DA070): (13) CND Afloat systems. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 4 of 39 P-1 Line #82 Volume 2 - 782 === page 863 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Info Systems Security Program (ISSP) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 4.905 4.870 4.827 0.000 4.827 - Gross/Weapon System Cost ($ in Millions) 1,315.600 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,315.600 Plus CY Advance Procurement ($ in Millions) - - - - - 4.905 4.870 4.827 0.000 4.827 - Total Obligation Authority ($ in Millions) 1,315.600 FY 2027 Total - - - - - 4.905 4.870 4.827 0.000 4.827 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Hardware - Consolidated Prior Year Requirements Cost Non Recurring Cost 1.1.1) Consolidated Prior Year Requirements - - 1,194.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 1,194.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,194.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware Consolidated Prior Year Requirements Cost Hardware - Public Key Infrastructure (PKI) (DA018) Cost Recurring Cost 2.1.1) PKI - 0.882 45,386 40.024 88.500 10 0.885 88.500 10 0.885 88.500 10 0.885 - - 0.000 88.500 10 0.885 Subtotal: Recurring Cost - - 40.024 - - 0.885 - - 0.885 - - 0.885 - - 0.000 - - 0.885 Subtotal: Hardware - Public Key Infrastructure (PKI) (DA018) Cost - - 40.024 - - 0.885 - - 0.885 - - 0.885 - - 0.000 - - 0.885 0.820 - - 0.000 0.820 - - 0.000 Procurement (†) Hardware - Navy Cyber Situational Awareness (NCSA) (DA070) Cost Recurring Cost 3.1.1) NCSA Procurement (†) (1) Subtotal: Recurring Cost 928.571 - 7 - 6.500 900.000 6.500 LI 3415 - Info Systems Security Program (ISSP) Navy - 1 - 0.900 0.900 900.000 - 1 - 0.900 0.900 UNCLASSIFIED Page 5 of 39 820.000 - 1 - P-1 Line #82 820.000 - 1 - 0.820 0.820 Volume 2 - 783 === page 864 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Info Systems Security Program (ISSP) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Hardware - Navy Cyber Situational Awareness (NCSA) (DA070) Cost Unit Cost ($ K) - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($ K) 6.500 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 0.900 - - 0.900 - - 0.820 - - 0.000 - - 0.820 Hardware - Computer Network Defense (CND) Afloat Procurement Cost Recurring Cost 4.1.1) CND - Afloat 35.441 356 12.617 39.231 13 0.510 39.167 12 0.470 39.231 13 0.510 - - 0.000 39.231 13 0.510 Subtotal: Recurring Cost - - 12.617 - - 0.510 - - 0.470 - - 0.510 - - 0.000 - - 0.510 Subtotal: Hardware Computer Network Defense (CND) Afloat Procurement Cost - - 12.617 - - 0.510 - - 0.470 - - 0.510 - - 0.000 - - 0.510 Procurement (†) Hardware - Public Key Infrastructure (PKI) Installations Cost Recurring Cost 5.1.1) PKI - - - 11.992 - - 0.309 - - 0.318 - - 0.328 - - 0.000 - - 0.328 Subtotal: Recurring Cost - - 11.992 - - 0.309 - - 0.318 - - 0.328 - - 0.000 - - 0.328 Subtotal: Hardware - Public Key Infrastructure (PKI) Installations Cost - - 11.992 - - 0.309 - - 0.318 - - 0.328 - - 0.000 - - 0.328 Installations (2) Hardware - Navy Cyber Situational Awareness (NCSA) Installations Cost Recurring Cost 6.1.1) NCSA - - - 2.106 - - 0.349 - - 0.368 - - 0.368 - - 0.000 - - 0.368 Subtotal: Recurring Cost - - 2.106 - - 0.349 - - 0.368 - - 0.368 - - 0.000 - - 0.368 Subtotal: Hardware - Navy Cyber Situational Awareness (NCSA) Installations Cost - - 2.106 - - 0.349 - - 0.368 - - 0.368 - - 0.000 - - 0.368 Installations (3) Hardware - Computer Network Defense (CND) Afloat Installations Cost Recurring Cost 7.1.1) CND - Afloat - - 24.430 - - 0.783 - - 0.724 - - 0.783 - - 0.000 - - 0.783 Subtotal: Recurring Cost - - 24.430 - - 0.783 - - 0.724 - - 0.783 - - 0.000 - - 0.783 Subtotal: Hardware Computer Network Defense (CND) Afloat Installations Cost - - 24.430 - - 0.783 - - 0.724 - - 0.783 - - 0.000 - - 0.783 Installations (4) Support - Public Key Infrastructure (PKI) Cost LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 6 of 39 P-1 Line #82 Volume 2 - 784 === page 865 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Info Systems Security Program (ISSP) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 8.1) PKI - Production Support 8.2) PKI - Design Services Allocations (DSA) (5) Subtotal: Support - Public Key Infrastructure (PKI) Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) - - 6.009 - - 0.023 - - 0.023 - - 0.023 - - 0.000 - - 0.023 - - 6.896 - - 0.390 - - 0.413 - - 0.436 - - 0.000 - - 0.436 - - 12.905 - - 0.413 - - 0.436 - - 0.459 - - 0.000 - - 0.459 Support - Navy Cyber Situational Awareness (NCSA) Cost 9.1) NCSA - Production Support (6) 9.2) NCSA - DSA (7) Subtotal: Support - Navy Cyber Situational Awareness (NCSA) Cost - - 0.246 - - 0.030 - - 0.035 - - 0.030 - - 0.000 - - 0.030 - - 1.373 - - 0.366 - - 0.375 - - 0.284 - - 0.000 - - 0.284 - - 1.619 - - 0.396 - - 0.410 - - 0.314 - - 0.000 - - 0.314 Support - Computer Network Defense (CND) Afloat Cost 10.1) CND - Train-theTrainer - - 6.936 - - 0.310 - - 0.310 - - 0.310 - - 0.000 - - 0.310 10.2) CND - Production Support - - 0.894 - - 0.034 - - 0.034 - - 0.034 - - 0.000 - - 0.034 10.3) CND - DSA - - 1.577 - - 0.016 - - 0.015 - - 0.016 - - 0.000 - - 0.016 Subtotal: Support Computer Network Defense (CND) Afloat Cost - - 9.407 - - 0.360 - - 0.359 - - 0.360 - - 0.000 - - 0.360 Gross/Weapon System Cost - - 1,315.600 - - 4.905 - - 4.870 - - 4.827 - - 0.000 - - 4.827 (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) Navy Cyber Situational Awareness (NCSA): Total cost decrease from FY26 to FY27 due to lower cost provided by the NCSA Independent Government Cost Estimate. FY27 installation increase accounts for a slight increase for inflation. Installation and support costs fluctuate based on installation site. The FY27 installation increase reflects the current inflationary environment and its impact on material and labor costs. FY27 Design Services Allocation (DSA) cost increase reflects the current inflationary environment and its impact on material and labor costs. Pre-Installation DSA are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. (6) Installation and support costs fluctuate based on installation site. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 7 of 39 P-1 Line #82 Volume 2 - 785 === page 866 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : (7) Item Number / Title [DODIC]: 1 / Info Systems Security Program (ISSP) MDAP/MAIS Code: Installation and support costs fluctuate based on installation site. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 8 of 39 P-1 Line #82 Volume 2 - 786 === page 867 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 Cost Elements 2.1.1) PKI - Procurement 2.1.1) PKI - Procurement 2.1.1) PKI - Procurement 3.1.1) NCSA - Procurement 3.1.1) NCSA - Procurement 3.1.1) NCSA - Procurement 4.1.1) CND - Afloat Procurement 4.1.1) CND - Afloat Procurement 4.1.1) CND - Afloat Procurement O O C P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Info Systems Security Program (ISSP) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 Defense Manpower Data Center / Alexandria, VA WR Alexandria, VA Feb 2025 Mar 2025 10 88.500 Y 2026 Defense Manpower Data Center / Alexandria, VA WR Alexandria, VA Feb 2026 Mar 2026 10 88.500 Y 2027 Defense Manpower Data Center / Alexandria, VA WR Alexandria, VA Feb 2027 Mar 2027 10 88.500 Y 2025 Naval Information Warfare Center (NIWC) Pacific / San Diego, CA WR San Diego, CA Dec 2024 Mar 2025 1 900.000 Y 2026 Naval Information Warfare Center (NIWC) Pacific / San Diego, CA WR San Diego, CA Dec 2025 Mar 2026 1 900.000 Y 2027 Naval Information Warfare Center (NIWC) Pacific / San Diego, CA WR San Diego, CA Dec 2026 Mar 2027 1 820.000 Y 2025 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC WR San Diego,CA Dec 2024 Jan 2025 13 39.231 Y 2026 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC WR San Diego,CA Dec 2025 Jan 2026 12 39.167 Y 2027 Naval Information Warfare Center (NIWC) Atlantic / Charleston, SC WR San Diego, CA Dec 2026 Jan 2027 13 39.231 Y LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 9 of 39 P-1 Line #82 (Each) RFP Issue Date Volume 2 - 787 === page 868 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 27.717 27.688 24.109 0.000 24.109 27.465 28.165 29.037 354.052 354.052 354.052 - - - - - - - - 27.717 27.688 24.109 0.000 24.109 27.465 28.165 29.037 - - - - - - - - 27.717 27.688 24.109 0.000 24.109 27.465 28.165 29.037 To FY 2031 Complete 29.877 Continuing - Continuing - 29.877 Continuing - Total - Continuing - - 29.877 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Computer Network Defense (CND) ashore sites represent multiple CND architectures/capabilities within each build that are specifically procured for each site based on the site mission and latest cyber threat. CND builds and variants are specifically designed to each site in accordance with CND's rapid Information Technology (IT) fielding construct. CND ashore sites include: IT 21st Century (IT-21) Networks Operation Centers (NOCs) which provide regional protection to shore and afloat assets within their area of responsibility; Navy Cyber Defense Operations Command (NCDOC), the designated Navy CND service provider, whose mission is to coordinate, monitor, analyze, and oversee the defense of Navy computer networks and NOCs who are responsible for accomplishing CND missions; Theater Network Operations and Security Centers (TNOSCs) and Outside the Continental United States (OCONUS) Navy Enterprise Network (ONE-Net) Local Network Service Centers (LNSCs). The ONE-Net security initiative consolidates LNSCs to their parent TNOSCs for more efficient operation and enables greater failover capability between ONE-Net sites; Broadcast Control Authorities (BCAs); Fixed Submarine Broadcast System (FSBS) which supports enhancements of other mission requirements (details held at a higher classification); P-913: Shore Based Enterprise Network Enhancements for the Naval Computer and Telecommunications Area Master Station Atlantic (NCTAMSLANT) Facility (MILCON P-913), which requires the CND capability; Pre-Planned Product Improvement (P3I) NCDOC upgrade which replaces end-of-life equipment with more robust capability at NCDOC to enhance the command's Cyber Defense Mission Support System (CDMSS) architectural framework to provide the necessary storage capability and processing power to ingest and analyze increased volumes of data from additional sources; The Virtual Training Environment (VTE) initiative which will transition equipment to an approved solution at the schoolhouses. CND is designated Training Support Agent (TSA) and CND Production Labs that provide CND architecture for production representative systems. CND also provides ashore infrastructure to provision the latest cyber security updates to all afloat tactical units including Consolidated Afloat Networks and Enterprise Services (CANES), Integrated Shipboard Network System (ISNS) and other networks, which roll up cyber network data to NCDOC. CND will deploy technologies to shore commands and the shore-based afloat infrastructure to improve network defense and security wholeness, countering intruders and attacks aimed at disrupting tactical communications at the afloat gateways and shore commands; this will help the Navy's ability to prevent, constrain, and mitigate cyber-attacks and critical vulnerabilities, as well as provide greater resiliency, awareness, data analytics, redundancy, and diversity into the Navy's Defense-in-Depth (DiD) strategy. CND shore sites will have modern network sensors, improving the ability to detect unusual network patterns and prevent/deter malicious attacks. CND procurement/installation quantities represent multiple CND architectures with an assortment of builds that are specifically designed to each site. Costs may vary by site and variant. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 10 of 39 P-1 Line #82 Volume 2 - 788 === page 869 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Shore Related RDT&E PEs: 0303140N Modification Type: Various Prior Years Financial Plan Modification Number / Title: 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Computer Network Defense (CND) Increment 2- Ashore (DA070) B Kits Recurring 1.1.1) Networks Operation Centers (NOC) - NonOrganic 57 / 58.503 3 / 3.093 3 / 3.093 1 / 1.031 - / - 1 / 1.031 3 / 3.100 4 / 4.124 3 / 3.100 4 / 4.174 Continuing Continuing 1.1.2) Navy Cyber Defense Operations Command (NCDOC) - NonOrganic 25 / 27.205 2 / 2.070 2 / 2.070 2 / 2.070 - / - 2 / 2.070 2 / 2.070 1 / 1.035 4 / 4.140 4 / 4.200 Continuing Continuing 1.1.3) Theater Network Operations & Security Center (TNOSC) - NonOrganic 41 / 42.702 2 / 2.141 2 / 2.238 2 / 2.339 - / - 2 / 2.339 2 / 2.339 2 / 2.339 2 / 2.339 1 / 1.185 Continuing Continuing 1.1.4) Broadcast Control Authorities (BCA) - 43 / 10.687 3 / 0.577 3 / 0.603 2 / 0.421 - / - 2 / 0.421 1 / 0.210 2 / 0.420 2 / 0.420 2 / 0.420 Continuing Continuing 1.1.5) Navy Enterprise Network (ONE-Net) Local Network Service Centers (LNSC) - NonOrganic 29 / 2.633 - - - / - - / - - - - - - 1.1.6) Fixed Submarine Broadcast System (FSBS) - 72 / 21.787 11 / 3.635 11 / 3.799 10 / 3.623 - / - 10 / 3.623 11 / 4.151 11 / 4.171 10 / 3.792 11 / 4.171 Continuing Continuing 11 / 28.670 1 / 2.228 1 / 2.228 1 / 2.229 - / - 1 / 2.229 1 / 2.229 1 / 2.229 1 / 2.229 1 / 2.229 Continuing Continuing 1.1.8) Virtual Training Environment (VTE) - Organic 10 / 9.476 1 / 0.918 1 / 0.930 1 / 0.942 - / - 1 / 0.942 1 / 0.942 1 / 0.942 1 / 0.942 1 / 0.942 Continuing Continuing 1.1.9) CND Production Labs - Organic 39 / 54.812 3 / 4.690 3 / 4.729 3 / 4.769 - / - 3 / 4.769 3 / 4.769 3 / 4.769 3 / 4.769 3 / 4.769 Continuing Continuing - - - / - - / - - - - - - / - Continuing Continuing / 17.424 - / - - / 22.090 Continuing Continuing 22 / 17.424 - / - 22 / 17.424 27 / 22.090 Continuing Continuing / 17.424 - / - - / 22.090 Continuing Continuing NonOrganic NonOrganic (8) (9) 1.1.7) Pre-Planned Product Improvement (P3I): NCDOC Upgrade - Organic 1.1.10) NCDOC COOP Site - NonOrganic Subtotal: Recurring 2 / 4.000 / 260.475 - Subtotal: Computer Network Defense (CND) Increment 2- Ashore (DA070) Subtotal: Procurement, All Modification Items 329 / 260.475 / 260.475 - / - / - / 19.352 - 26 / 19.352 / 19.352 - / - / - / 19.690 - 26 / 19.690 / 19.690 - - - / - / - / 17.424 / 17.424 / - / - / 19.810 - 24 / 19.810 / 19.810 - / - / - / 20.029 - 25 / 20.029 / 20.029 - / - / - / 21.731 - 26 / 21.731 / 21.731 - - - / - - / - 29 / 2.633 Support (All Modification Items) 2.1) Train-the-Trainer - / 11.003 - / 1.390 - / 1.035 - / 0.819 - / 0.000 - / 0.819 - / 1.102 - / 1.270 - / 1.069 - / 1.177 Continuing Continuing 2.2) Production Support - / 11.675 - / 1.008 - / 0.996 - / 0.676 - / 0.000 - / 0.676 - / 1.006 - / 1.235 - / 1.051 - / 1.197 Continuing Continuing / 9.660 - / 0.957 - / 0.957 - / 0.957 - / 0.000 - / 0.957 - / 0.904 - / 0.930 - / 0.000 - / 0.000 Continuing Continuing - / 32.338 - / 3.355 - / 2.988 - / 2.452 / - - / 2.452 - / 3.012 - / 3.435 - / 2.120 - / 2.374 Continuing Continuing - / 61.239 - / 5.010 - / 5.010 - / 4.233 / 0.000 - / 4.233 - / 4.643 - / 4.701 - / 5.186 - / 5.413 Continuing Continuing 2.3) Design Services Allocation (DSA) - (10) Subtotal: Support - Installation Modification Item 1 of 1: Computer Network Defense (CND) Increment 2- Ashore (DA070) LI 3415 - Info Systems Security Program (ISSP) Navy - UNCLASSIFIED Page 11 of 39 P-1 Line #82 Volume 2 - 789 === page 870 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Shore Financial Plan Related RDT&E PEs: 0303140N Modification Type: Various Prior Years Subtotal: Installation Modification Number / Title: 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / 61.239 - / 5.010 - / 5.010 - / 4.233 / - - - / 4.233 - / 4.643 - / 4.701 - / 5.186 - / 5.413 Continuing Continuing 29.877 Continuing Continuing Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 354.052 27.717 27.688 24.109 0.000 UNCLASSIFIED Page 12 of 39 24.109 27.465 28.165 P-1 Line #82 29.037 Volume 2 - 790 === page 871 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) MDAP/MAIS Code: Modification Item 1 of 1: Computer Network Defense (CND) Increment 2- Ashore (DA070) Manufacturer Information Manufacturer Name: CND Equipment - Naval Information Warfare Center (NIWC) Atlantic Manufacturer Location: Charleston, SC Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: Installed:: Installation Name: Computer Network Defense (CND) Increment 2- Ashore Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 269 / 61.239 21 / 5.010 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 21 / 5.010 21 / 5.010 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 21 / 5.010 17 / 4.233 - / - - / - - / - - / - 0 / 0.000 17 / 4.233 3 / 0.000 - / - - / - 0 / 0.000 22 / 4.643 20 / 4.701 - / - - / - 0 / 0.000 20 / 4.701 21 / 5.186 - / - 0 / 0.000 21 / 5.186 22 / 5.413 0 / 0.000 Prior Years 269 / 61.239 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 269 / 61.239 21 / 5.010 17 / 4.233 21 / 5.010 0 / 0.000 17 / 4.233 0 / 0.000 19 / 4.643 17 / 4.233 19 / 4.643 23 / 4.701 - 21 / 5.186 22 / 5.413 / - Continuing Continuing 22 / 5.413 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 269 - - 13 8 - - 13 8 - - 10 7 - - 12 7 - - 13 7 - - 13 8 - - 14 8 Cont. Cont. Out 269 - - 13 8 - - 13 8 - - 10 7 - - 12 7 - - 13 7 - - 13 8 - - 14 8 Cont. Cont. Method of Implementation (Organic): Pre-Planned Product Improvement (P3I): NCDOC Upgrade - Not Installed Installation Quantity: 0 Method of Implementation (Organic): Virtual Training Environment (VTE) - Not Installed Installation Quantity: 0 LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 13 of 39 P-1 Line #82 Q4 TC Tot Volume 2 - 791 === page 872 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Computer Network Defense (CND) Increment 2- Ashore (DA070) MDAP/MAIS Code: Modification Item 1 of 1: Computer Network Defense (CND) Increment 2- Ashore (DA070) Installation Information Method of Implementation (Organic): CND Production Labs - Not Installed Installation Quantity: 0 Footnotes: (8) (9) The FY27 unit cost increase is a result of the vendor no longer offering the bulk pricing benefits due to lower procurement quantities. FY27 unit price increase for CND Ashore systems is directly attributable to ongoing inflationary pressures impacting raw material costs, labor expenses, and supply chain logistics. (10) Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 14 of 39 P-1 Line #82 Volume 2 - 792 === page 873 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / Navy Cryptography (Crypto) - Afloat (DA071) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 57.876 58.188 41.301 40.827 41.510 350.803 350.803 350.803 - - 57.876 58.188 - - 57.876 58.188 139.995 - 0.000 - 139.995 - 0.000 - 139.995 0.000 139.995 139.995 139.995 - - - 41.301 40.827 41.510 - - - 41.301 40.827 41.510 To FY 2031 Complete 42.525 Continuing - Continuing - 42.525 Continuing - Total - Continuing - - 42.525 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Navy Cryptography (Crypto) program is designated as Department of Navy's (DON) Cryptographic Modernization Program Office (CMPO). CMPO procures, installs, and provides life-cycle support for National Security Agency (NSA) Type-1 end cryptographic units for United States Navy (USN) (to include Military Sealift Command (MSC) platforms), United States Marine Corps (USMC), and United States Coast Guard (USCG). Navy Crypto afloat equipment includes: Families of Communications Security (COMSEC) and Transmission Security (TRANSEC) devices that are divided into crypto voice, crypto data, crypto products, and associated ancillary devices. These devices provide modern cryptographic solutions to replace obsolete, legacy devices within the crypto categories for all Services. Crypto Data products include: Advanced Cryptographic Capabilities (ACC), which provide National Security Agency (NSA) mandated cryptographic security software modernization of various communications security devices by cease key dates (details held at a higher classification); In-Line Network Encryptors (INE); KIV-7M (COMSEC Serial Crypto Replacement); KW-46; Cryptographic Universal Enclosures (CUE), and KGV-11M TRANSEC. Cryptographic Modernization (CM) provides NSA mandated cryptographic modernization of various communications security devices (details held at a higher classification). Crypto Voice products include: VINSON/Advanced Narrowband Digital Voice Terminal (ANDVT) Cryptographic Modernization (VACM). VACM is the modern cryptographic product replacement for legacy secure voice products. Naval Information Warfare Systems Command (NAVWAR) is the VACM Central Procuring Agency for the USN to include the MSC, Naval Air Systems Command (NAVAIR), USMC and USCG. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 15 of 39 P-1 Line #82 Volume 2 - 793 === page 874 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Navy Cryptography (Crypto) - Afloat (DA071) MDAP/MAIS Code: Models of Systems Affected: Ship Related RDT&E PEs: 0303140N Modification Type: Various Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Navy Cryptography (Crypto) - Afloat (DA071) B Kits Recurring 1.1.1) VINSON/Advanced Narrowband Digital Voice Terminal CM (VACM) - NonOrganic 1.1.2) In-Line Network Encryptors (INE) - Organic (11) 530 / 121.900 140 / 1.680 5 / 2.500 6 / 3.000 39 / 19.500 72 / 36.000 105 / 52.500 (13) 1.1.6) Encapsulation - Organic Subtotal: Procurement, All Modification Items / - 129 / 1.548 1.1.5) Cryptographic Modernization 2 (CM2) - Organic Subtotal: Navy Cryptography (Crypto) - Afloat (DA071) - 48 / 24.000 (12) Subtotal: Recurring / - 6,011 / 78.414 1.1.3) Advanced Cryptographic Capability (ACC) Organic 1.1.4) Cryptographic Modernization (CM) - Organic - - / - - / - / 243.814 - 6,628 / 243.814 / 243.814 - - / - 32 / 15.488 / 55.536 - 238 / 55.536 / 55.536 - - / - - / - / 57.180 - 251 / 57.180 / 57.180 - - / - - / - - / - - / - 72 / 36.000 - / - 72 / 36.000 74 / 37.000 77 / 38.500 197 / 98.500 - / - 197 / 98.500 3 / 1.500 1 / 0.500 178 / 2.136 - - / - - / - 178 / 2.136 - / - 212 / 2.544 / - - 131 / 1.572 / - - 176 / 2.112 / - - 78 / 39.000 / - - / - - 447 / 136.636 - / - 447 / 136.636 / 136.636 - / - - - / 3.359 - / - / - - / - - / - - / 3.359 - / 0.257 - / 0.255 - / 0.398 / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 289 / 41.044 / 41.044 - / - - / - / 41.044 / 40.572 - 209 / 40.572 / 40.572 - / 41.112 - 254 / 41.112 / 41.112 - - / - 160 / 1.920 / - / - - - / - - / 136.636 / - - - / 136.636 - / - / - - / - - / 136.636 - - - - / - 74 / 37.000 - 530 / 121.900 Continuing Continuing Continuing Continuing Continuing Continuing 6 / 3.000 - / - - / / - 207 / 103.500 / - - / 41.920 Continuing Continuing 240 / 41.920 - 32 / 15.488 Continuing Continuing / 41.920 Continuing Continuing / 0.605 Continuing Continuing / - Continuing Continuing - / 0.605 Continuing Continuing - / 0.000 - / 0.000 - / 31.926 / - - / 0.000 - / 31.926 42.525 Continuing - Support (All Modification Items) - / 31.531 - / 44.857 - / 76.388 - / 1.015 - / 1.008 - / 3.359 Modification Item 1 of 1: Navy Cryptography (Crypto) Afloat (DA071) - / 30.601 - / 1.325 - / 0.000 - / 0.000 Subtotal: Installation - / 30.601 - / 1.325 2.1) Production Support (14) 2.2) DSA Subtotal: Support - / 1.015 - - / - / 1.008 - / - - - / 3.359 - - / - / 0.257 - - / - / 0.255 - - / - / 0.398 - - / - - Installation - / - - / - - / - - 0.000 139.995 - / - - / - - / - - / - - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 350.803 57.876 58.188 139.995 UNCLASSIFIED Page 16 of 39 41.301 40.827 P-1 Line #82 41.510 Continuing Volume 2 - 794 === page 875 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Navy Cryptography (Crypto) - Afloat (DA071) MDAP/MAIS Code: Modification Item 1 of 1: Navy Cryptography (Crypto) - Afloat (DA071) Manufacturer Information Manufacturer Name: In-Line Network Encryptors (INE) - NSA Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 7 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jan 2025 Jan 2026 Jan 2027 FY 2028 Delivery Dates Aug 2025 Aug 2026 Aug 2027 Manufacturer Name: Advanced Cryptographic Capability (ACC) - NSA FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Production Leadtime (in Months): 7 FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Aug 2025 Aug 2026 FY 2027 FY 2028 Manufacturer Name: Cryptographic Modernization (CM) FY 2029 Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 Contract Dates Mar 2025 Mar 2026 Mar 2027 Delivery Dates FY 2028 Mar 2026 Mar 2027 Mar 2028 FY 2029 Manufacturer Name: Cryptographic Modernization 2 (CM2) Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 12 Dates FY 2030 Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 3 Dates FY 2029 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Delivery Dates Mar 2028 FY 2029 Installation Information Method of Implementation: Installed:: Installation Name: Navy Cryptography (Crypto) - Afloat Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 508 / 30.601 22 / 1.325 530 / 31.926 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 17 of 39 P-1 Line #82 Volume 2 - 795 === page 876 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Navy Cryptography (Crypto) - Afloat (DA071) MDAP/MAIS Code: Modification Item 1 of 1: Navy Cryptography (Crypto) - Afloat (DA071) Installation Information Method of Implementation: Installed:: Installation Name: Navy Cryptography (Crypto) - Afloat Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 22 / 1.325 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost Total 508 / 30.601 530 / 31.926 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 508 22 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 530 Out 508 22 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 530 Method of Implementation (Organic): In-Line Network Encryptors (INE) Installation Quantity: 0 Method of Implementation (Organic): Advanced Cryptographic Capability (ACC) Installation Quantity: 0 Method of Implementation (Organic): Cryptographic Modernization (CM) Installation Quantity: 0 Method of Implementation (Organic): Cryptographic Modernization 2 (CM2) Installation Quantity: 207 Method of Implementation (Organic): Encapsulation Installation Quantity: 32 Footnotes: (11) FY27 increase aligns to inventory levels in accordance with the NSA cease key dates (classified) for TS and S circuits. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 18 of 39 P-1 Line #82 Volume 2 - 796 === page 877 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Navy Cryptography (Crypto) - Afloat (DA071) MDAP/MAIS Code: (12) FY27 decrease due to adding a new cost element, Crypto Mod 2 (CM2) starting in FY27. National Manager requirements, CM2, HAIPE Binding Operational Directive (BOD) to provide critical cybersecurity updates and replace vulnerable communications security (COMSEC) devices in order to preserve Navy secure communications (confidentiality, integrity and availability) which impact Nuclear Command and Control (NC3), network enabled weapons, enterprise and tactical systems and therefore warfighting capability. (13) FY27 increase due to adding Cryptographic Modernization 2 (CM2) cost element starting in FY27. National Manager requirements, CM2, HAIPE Binding Operational Directive (BOD) to provide critical cybersecurity updates and replace vulnerable communications security (COMSEC) devices in order to preserve Navy secure communications (confidentiality, integrity and availability) which impact Nuclear Command and Control (NC3), network enabled weapons, enterprise and tactical systems and therefore warfighting capability. (14) FY27 production support increase is driven by the procurement of Crypto Modernization 2 (CM2) devices. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 19 of 39 P-1 Line #82 Volume 2 - 797 === page 878 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Navy Cryptography (Crypto) - Ashore (DA071) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 53.452 56.369 37.396 37.977 38.540 265.766 265.766 265.766 - - 53.452 56.369 - - 53.452 56.369 138.480 - 0.000 - 138.480 - 0.000 - 138.480 0.000 138.480 138.480 - - - 37.396 37.977 38.540 138.480 - - - 37.396 37.977 38.540 To FY 2031 Complete 39.200 Continuing - Continuing - 39.200 Continuing - Total - Continuing - - 39.200 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Navy Cryptography (Crypto) ashore equipment includes: Families of Communication Security (COMSEC) and Transmission Security (TRANSEC) devices that are divided into crypto voice, crypto data, crypto products, and associated ancillary devices. These devices provide modern cryptographic solutions to replace obsolete, legacy devices within the crypto categories for all Services. Navy Crypto Ashore sites include: United States Navy (USN), United States Marine Corps (USMC), United States Coast Guard (USCG) facilities, and Ballistic Missile Defense facilities, production/integration sites, and training sites. Crypto Data products include: Advanced Cryptographic Capabilities (ACC) which provide NSA mandated cryptographic security software modernization of various communications security devices by cease key dates (details held at a higher classification); Cryptographic Modernization (CM) provides NSA mandated cryptographic modernization of various communications security devices (details held at a higher classification). Crypto Voice products include: VINSON/Advanced Narrowband Digital Voice Terminal (ANDVT) Cryptographic Modernization (VACM). Naval Information Warfare Systems Command (NAVWAR) is the VACM Central Procuring Agency for the USN to include the Military Sealift Command (MSC), Naval Air Systems Command (NAVAIR), USMC and USCG. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 20 of 39 P-1 Line #82 Volume 2 - 798 === page 879 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Navy Cryptography (Crypto) - Ashore (DA071) MDAP/MAIS Code: Models of Systems Affected: Shore Related RDT&E PEs: 0303140N Modification Type: Initial Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Navy Cryptography (Crypto) - Ashore (DA071) B Kits Recurring 1.1.1) VINSON/Advanced Narrowband Digital Voice Terminal CM (VACM) - Organic 10,160 / 116.592 1.1.2) Advanced Cryptographic Capability (ACC) Organic 40 / 20.000 1.1.3) VACM - NonOrganic 1.1.4) Cryptographic Modernization (CM) - Organic - 41 / 20.500 1.1.5) Cryptographic Modernization 2 (CM2) - Organic (16) 1.1.6) Encapsulation - Organic Subtotal: Recurring - - / - - / - Subtotal: Procurement, All Modification Items - - - / - - / - - / - - / - - / - - / - - / - - / - 11 / 5.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - 68 / 34.000 - 32 / 15.488 - / 52.488 10,427 / 228.702 106 / 52.488 / 228.702 - / 52.488 / - - / - 73 / 36.500 - / - 73 / 36.500 73 / 36.500 197 / 98.500 - / - 197 / 98.500 1 / 0.500 100 / 50.000 / - / 228.702 Subtotal: Navy Cryptography (Crypto) - Ashore (DA071) - 6 / 3.000 186 / 71.610 (15) / - - / - - / - / 55.500 - 111 / 55.500 / 55.500 - / - - / - / 135.000 - - / - - 270 / 135.000 - / - 270 / 135.000 / 135.000 - / - - - - - / - / 135.000 / 135.000 - / - / 37.000 - 74 / 37.000 / 37.000 - 75 / 37.500 - / - - / - / 37.500 - 75 / 37.500 / 37.500 - 76 / 38.000 - / - - / - / 38.000 - 76 / 38.000 / 38.000 - 72 / 36.000 - Continuing - / - Continuing 5 / 2.500 - / - - / / - 10,160 / 116.592 Continuing 186 / 71.610 Continuing 203 / 101.500 / - - / 38.500 Continuing Continuing 77 / 38.500 Continuing Continuing / 38.500 Continuing Continuing - - 32 / 15.488 Support (All Modification Items) - / 18.895 - / 0.964 - / 0.869 - / 3.480 - / - - / 3.480 - / 0.396 - / 0.477 - / 0.540 - / 0.700 Continuing Continuing - / 18.895 - / 0.964 - / 0.869 - / 3.480 - / - - / 3.480 - / 0.396 - / 0.477 - / 0.540 - / 0.700 Continuing Continuing Modification Item 1 of 1: Navy Cryptography (Crypto) Ashore (DA071) - / 18.169 - / 0.000 - / 0.000 - / 0.000 / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 18.169 Subtotal: Installation - / 18.169 / - - / 0.000 - / 18.169 39.200 Continuing 2.1) Production Support (17) Subtotal: Support Installation - / - - / - - / - - / - - 0.000 138.480 - / - - / - - / - - / - - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 265.766 53.452 56.369 138.480 UNCLASSIFIED Page 21 of 39 37.396 37.977 P-1 Line #82 38.540 Continuing Volume 2 - 799 === page 880 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Navy Cryptography (Crypto) - Ashore (DA071) MDAP/MAIS Code: Modification Item 1 of 1: Navy Cryptography (Crypto) - Ashore (DA071) Manufacturer Information Manufacturer Name: VINSON/Advanced Narrowband Digital Voice Terminal CM (VACM) - Raytheon (USAF) Manufacturer Location: Largo, FL Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: Advanced Cryptographic Capability (ACC) - NSA Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 7 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jan 2025 Jan 2026 Jan 2027 FY 2028 Delivery Dates Aug 2025 Aug 2026 Aug 2027 Manufacturer Name: Cryptographic Modernization (CM) Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 Contract Dates Mar 2025 Mar 2026 Mar 2027 Delivery Dates Mar 2026 Mar 2027 FY 2028 Mar 2028 Manufacturer Name: Cryptographic Modernization 2 (CM2) FY 2029 Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 5 Dates FY 2029 Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Delivery Dates Mar 2028 FY 2029 Installation Information Method of Implementation: Installed:: Installation Name: Navy Cryptography (Crypto) - Ashore Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 186 / 18.169 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 186 / 18.169 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 22 of 39 P-1 Line #82 Volume 2 - 800 === page 881 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Navy Cryptography (Crypto) - Ashore (DA071) MDAP/MAIS Code: Modification Item 1 of 1: Navy Cryptography (Crypto) - Ashore (DA071) Installation Information Method of Implementation: Installed:: Installation Name: Navy Cryptography (Crypto) - Ashore Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost Total 186 / 18.169 186 / 18.169 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 186 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 186 Out 186 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 186 Method of Implementation (Organic): VINSON/Advanced Narrowband Digital Voice Terminal CM (VACM) Installation Quantity: 10160 Method of Implementation (Organic): Advanced Cryptographic Capability (ACC) Installation Quantity: 0 Method of Implementation (Organic): Cryptographic Modernization (CM) Installation Quantity: 0 Method of Implementation (Organic): Cryptographic Modernization 2 (CM2) Installation Quantity: 203 Method of Implementation (Organic): Encapsulation Installation Quantity: 32 Footnotes: LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 23 of 39 P-1 Line #82 Volume 2 - 801 === page 882 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Navy Cryptography (Crypto) - Ashore (DA071) MDAP/MAIS Code: (15) FY27 decrease due to adding a new cost element, Crypto Mod 2 (CM2) starting in FY27. National Manager requirements, CM2, HAIPE Binding Operational Directive (BOD) to provide critical cybersecurity updates and replace vulnerable communications security (COMSEC) devices in order to preserve Navy secure communications (confidentiality, integrity and availability) which impact Nuclear Command and Control (NC3), network enabled weapons, enterprise and tactical systems and therefore warfighting capability. (16) FY27 increase due to adding Cryptographic Modernization 2 (CM2) cost element starting in FY27. National Manager requirements, CM2, HAIPE Binding Operational Directive (BOD) to provide critical cybersecurity updates and replace vulnerable communications security (COMSEC) devices in order to preserve Navy secure communications (confidentiality, integrity and availability) which impact Nuclear Command and Control (NC3), network enabled weapons, enterprise and tactical systems and therefore warfighting capability. (17) FY27 production support increase is driven by the procurement of Crypto Modernization devices. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 24 of 39 P-1 Line #82 Volume 2 - 802 === page 883 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / Key Management (KM) - Afloat (DA005) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.447 7.140 8.838 0.000 8.838 9.186 10.753 11.001 105.649 105.649 105.649 - - - - - - - - 7.447 7.140 8.838 0.000 8.838 9.186 10.753 11.001 - - - - - - - - 7.447 7.140 8.838 0.000 8.838 9.186 10.753 11.001 To FY 2031 Complete - Total - 11.254 Continuing - Continuing - 11.254 Continuing - Continuing - - 11.254 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: KM is a combination of Tier 1 Key Management Infrastructure (KMI), Tier 2 security equipment, and Tier 3 equipment and software (SW) for Key distribution and loading into End Cryptographic Units (ECUs). KMI Tier 1 includes Navy management of central office of record functionality, key manager functions, and enrollment and registration functions utilizing Client Host Only (CHO) node equipment. KMI Tier 2 security equipment includes the Management Client (MGC), Advanced Key Processor (AKP) and High Assurance Internet Protocol Equipment (HAIPE) devices. KMI provides a net-centric, web based architecture for the ordering, management, and distribution of all cryptographic key material to support Department of Navy users. Key Load Devices include the Simple Key Loader (SKL), Tactical Key Loader (TKL), Next Generation Load Device (NGLD), and SW application for Key delivery. The SKL is a ruggedized, portable, hand-held fill device, for securely receiving, storing, and transferring data between compatible cryptographic and communications equipment. The SKL is backward-compatible with existing End Cryptographic Units (ECU) and forward-compatible with future security equipment and systems, including KMI. The TKL is a ruggedized, portable, hand-held fill device, for securely receiving, storing, and transferring data between compatible cryptographic and communications equipment for tactical missions. The TKL is backward-compatible with existing End Cryptographic Units (ECU) and forward-compatible with future security equipment and systems, including KMI. The NGLD is a NSA certified hand-portable electronic cryptographic key fill device. It receives, stores, protects, and loads NSA generated cryptographic key and mission configuration files into End Cryptographic Units (ECUs). Additionally, the NGLD will display stored signal operating instructions (SOI). In the future, the NGLD will replace the legacy SKL. The SW application for Key delivery plans to provide remote key distribution. KMI Tech Refresh is a hardware and software upgrade to KMI Capability Increments (CI) 2&3 that is mandated by National Security Agency (NSA) to occur every five-years. KMI Tech Refresh consists of removing, replacing, integrating and testing for operational readiness the following components within the Tier 2 framework. The HAIPE device, firewall, central processing unit and peripherals are refreshed during installations on Navy platforms (Ship, Shore and Submarine). LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 25 of 39 P-1 Line #82 Volume 2 - 803 === page 884 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Key Management (KM) - Afloat (DA005) MDAP/MAIS Code: Models of Systems Affected: Ship Related RDT&E PEs: 0303140N Modification Type: Various Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Key Management (KM) Afloat (DA005) B Kits Recurring 1.1.1) Key Load Device - Organic (18) 1.1.2) Key Management Infrastructure (KMI) NSA Mandated Updates - NonOrganic (19) Subtotal: Recurring Subtotal: Key Management (KM) - Afloat (DA005) Subtotal: Procurement, All Modification Items 13,036 / 59.386 154 / 0.764 142 / 0.871 230 / 1.440 - / - 230 / 1.440 184 / 1.175 191 / 1.244 84 / 0.558 73 / 0.495 Continuing Continuing 222 / 8.459 35 / 1.735 43 / 2.174 49 / 2.527 - / - 49 / 2.527 51 / 2.683 65 / 3.488 66 / 3.613 68 / 3.796 Continuing Continuing / 4.291 Continuing Continuing 141 / 4.291 Continuing Continuing / 67.845 - 13,258 / 67.845 - - / 2.499 189 / 2.499 - / 3.045 185 / 3.045 / 3.967 - / - - 279 / 3.967 - / - 279 / 3.967 - / 3.967 - / 3.858 235 / 3.858 - / 4.732 256 / 4.732 - / 4.171 150 / 4.171 - / 67.845 - / 2.499 - / 3.045 - / 3.967 - / - - / 3.967 - / 3.858 - / 4.732 - / 4.171 - / 4.291 Continuing Continuing Support (All Modification Items) 2.1) Production Support - / 4.007 - / 0.147 - / 0.181 - / 0.229 - / - - / 0.229 - / 0.223 - / 0.277 - / 0.171 - / 0.166 Continuing Continuing 2.2) Train the Trainer - / 1.045 - / 0.113 - / 0.114 - / 0.117 - / - - / 0.117 - / 0.117 - / 0.119 - / 0.121 - / 0.122 Continuing Continuing - / 24.452 - / 1.988 - / 2.050 - / 2.375 - / - - / 2.375 - / 2.538 - / 3.075 - / 3.288 - / 3.375 Continuing Continuing - / 29.504 - / 2.248 - / 2.345 - / 2.721 - / - - / 2.721 - / 2.878 - / 3.471 - / 3.580 - / 3.663 Continuing Continuing / 0.000 - / 2.150 - / 2.450 - / 2.550 - / 3.250 - / 3.300 Continuing Continuing / - - / 2.150 - / 2.450 - / 2.550 - / 3.250 - / 3.300 Continuing Continuing 11.254 Continuing Continuing 2.3) DSA (20) Subtotal: Support Installation Modification Item 1 of 1: Key Management (KM) - Afloat (DA005) - / 8.300 - / 2.700 - / 1.750 - / 2.150 Subtotal: Installation - / 8.300 - / 2.700 - / 1.750 - / 2.150 - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 105.649 7.447 7.140 8.838 0.000 UNCLASSIFIED Page 26 of 39 8.838 9.186 10.753 P-1 Line #82 11.001 Volume 2 - 804 === page 885 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Key Management (KM) - Afloat (DA005) MDAP/MAIS Code: Modification Item 1 of 1: Key Management (KM) - Afloat (DA005) Manufacturer Information Manufacturer Name: Key Load Device - Sierra Nevada Corporation Manufacturer Location: Sparks, NV Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jun 2025 Jun 2026 Jun 2027 FY 2028 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Manufacturer Name: Key Management Infrastructure (KMI) NSA Mandated Updates FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2025 Jan 2026 Jan 2027 Delivery Dates Oct 2025 Oct 2026 Oct 2027 FY 2029 Installation Information Method of Implementation: Installed:: Installation Name: Key Management (KM) - Afloat Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 168 / 8.300 54 / 2.700 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 222 / 11.000 35 / 1.750 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 35 / 1.750 43 / 2.150 - / - - / - - / - - / - 0 / 0.000 43 / 2.150 49 / 2.450 - / - - / - - / - 0 / 0.000 49 / 2.450 51 / 2.550 - / - - / - 0 / 0.000 51 / 2.550 65 / 3.250 - / - 0 / 0.000 65 / 3.250 66 / 3.300 0 / 0.000 66 / 3.300 FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 66 / 3.300 Continuing Continuing Total 168 / 8.300 LI 3415 - Info Systems Security Program (ISSP) Navy 54 / 2.700 35 / 1.750 43 / 2.150 43 / 2.150 0 / 0.000 0 / 0.000 UNCLASSIFIED Page 27 of 39 43 / 2.150 49 / 2.450 51 / 2.550 P-1 Line #82 65 / 3.250 68 / 3.400 68 / 3.400 Volume 2 - 805 === page 886 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Key Management (KM) - Afloat (DA005) MDAP/MAIS Code: Modification Item 1 of 1: Key Management (KM) - Afloat (DA005) Installation Information Method of Implementation: Installed:: Installation Name: Key Management (KM) - Afloat Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 168 14 14 13 13 9 10 9 7 11 12 11 9 13 12 12 12 11 14 13 13 16 18 16 15 14 19 17 16 Cont. Cont. Out 168 14 14 13 13 9 10 9 7 11 12 11 9 13 12 12 12 11 14 13 13 16 18 16 15 14 19 17 16 Cont. Cont. Method of Implementation (Organic): Key Load Device - Not Installed Q4 TC Tot Installation Quantity: 0 Footnotes: (18) FY27 increased Key Loader quantity due to the need to replenish the fleet with key-fill devices required to conduct secure, mission-critical communications. Quantities fluctuate to remain within the Inventory Objective Capability (IOC). (19) FY27 increase in quantity reflects current projected need and planned installations to Fleet due to NSA mandate. KMI TR cost increases account for inflation, increased engineering & integration costs, and varies due to economy of scale procurement buys. (20) FY27 increase reflects current projected need and planned installations to Fleet due to NSA mandate. Pre-Installation Design Services Allocation (DSA) are required in order to complete ship check and installation drawings for installation planning and is performed 6-12 months prior to installation start. Post Installation DSA support requirements include drawings closeout. DSA costs will fluctuate each FY as it is a factor of the number of installations and platform type in any given fiscal year. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 28 of 39 P-1 Line #82 Volume 2 - 806 === page 887 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / Key Management (KM) - Ashore (DA005) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 73.754 5.767 5.841 5.384 0.000 5.384 4.495 4.848 4.007 - - - - - - - - - 73.754 5.767 5.841 5.384 0.000 5.384 4.495 4.848 4.007 - - - - - - - - - 73.754 5.767 5.841 5.384 0.000 5.384 4.495 4.848 4.007 To FY 2031 Complete - Total - 4.086 Continuing - Continuing - 4.086 Continuing - Continuing - - 4.086 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Key Management (KM) ashore sites include: United States Navy (USN), United States Marine Corps (USMC), United States Coast Guard (USCG) facilities, production integration sites, and training sites. KM is a combination of Tier 1 Key Management Infrastructure (KMI), Tier 2 security equipment, and Tier 3 equipment and software (SW) for Key distribution and loading into End Cryptographic Units (ECUs). KMI Tier 1 includes Navy management of central office of record functionality, key manager functions, and enrollment and registration functions utilizing Client Host Only (CHO) node equipment. KMI Tier 2 security equipment includes the Management Client (MGC), Advanced Key Processor (AKP) and High Assurance Internet Protocol Equipment (HAIPE) devices. KMI provides a net-centric, web based architecture for the ordering, management, and distribution of all cryptographic key material to support Department of Navy users. Key Load Devices include the Simple Key Loader (SKL), Tactical Key Loader (TKL), Next Generation Load Device (NGLD), and SW application for Key delivery. The SKL is a ruggedized, portable, hand-held fill device, for securely receiving, storing, and transferring data between compatible cryptographic and communications equipment. The SKL is backward-compatible with existing End Cryptographic Units (ECU) and forward-compatible with future security equipment and systems, including KMI. The TKL is a ruggedized, portable, hand-held fill device, for securely receiving, storing, and transferring data between compatible cryptographic and communications equipment for tactical missions. The TKL is backward-compatible with existing End Cryptographic Units (ECU) and forward-compatible with future security equipment and systems, including KMI. The NGLD is a NSA certified hand-portable electronic cryptographic key fill device. It receives, stores, protects, and loads NSA generated cryptographic key and mission configuration files into End Cryptographic Units (ECUs). Additionally, the NGLD will display stored signal operating instructions (SOI). In the future, the NGLD will replace the legacy SKL. The SW application for Key delivery plans to provide remote key distribution. KMI Tech Refresh is a hardware and software upgrade to KMI Capability Increments (CI) 2&3 that is mandated by National Security Agency (NSA) to occur every five-years. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 29 of 39 P-1 Line #82 Volume 2 - 807 === page 888 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Key Management (KM) - Ashore (DA005) MDAP/MAIS Code: KMI Tech Refresh consists of removing, replacing, integrating and testing for operational readiness the following components within the Tier 2 framework. The HAIPE device, firewall, central processing unit and peripherals are refreshed during installations on Navy platforms (Ship, Shore and Submarine). LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 30 of 39 P-1 Line #82 Volume 2 - 808 === page 889 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Key Management (KM) - Ashore (DA005) MDAP/MAIS Code: Models of Systems Affected: Shore Related RDT&E PEs: 0303140N Modification Type: Various Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Key Management (KM) Ashore (DA005) B Kits Recurring 1.1.1) Key Management Infrastructure (KMI) NSA Mandated Updates - NonOrganic (21) 1.1.2) Key Load Device - Organic (22) Subtotal: Recurring Subtotal: Key Management (KM) - Ashore (DA005) Subtotal: Procurement, All Modification Items 283 / 10.196 40 / 1.781 46 / 2.089 28 / 1.297 - / - 28 / 1.297 31 / 1.465 33 / 1.590 33 / 1.622 35 / 1.755 Continuing Continuing 14,327 / 45.699 294 / 1.458 214 / 1.313 304 / 1.903 - / - 304 / 1.903 197 / 1.258 206 / 1.342 75 / 0.498 64 / 0.434 Continuing Continuing / 55.895 - 14,610 / 55.895 - - / 3.239 334 / 3.239 - / 3.402 260 / 3.402 / 3.200 - / - - 332 / 3.200 - / - 332 / 3.200 - / 3.200 - / 2.723 228 / 2.723 - / 2.932 239 / 2.932 - / 2.120 108 / 2.120 / 2.189 Continuing Continuing 99 / 2.189 Continuing Continuing - / 55.895 - / 3.239 - / 3.402 - / 3.200 - / - - / 3.200 - / 2.723 - / 2.932 - / 2.120 - / 2.189 Continuing Continuing Support (All Modification Items) 2.1) Production Support - / 5.150 - / 0.185 - / 0.197 - / 0.227 - / - - / 0.227 - / 0.188 - / 0.246 - / 0.167 - / 0.156 Continuing Continuing 2.2) Train the Trainer - / 1.162 - / 0.123 - / 0.126 - / 0.128 - / - - / 0.128 - / 0.132 - / 0.143 - / 0.143 - / 0.146 Continuing Continuing (23) - / 6.022 - / 0.970 - / 1.116 - / 0.679 - / - - / 0.679 - / 0.752 - / 0.752 - / 0.752 - / 0.770 Continuing Continuing / 12.334 - / 1.278 - / 1.439 - / 1.034 - / - - / 1.034 - / 1.072 - / 1.141 - / 1.062 - / 1.072 Continuing Continuing / 0.000 - / 1.150 - / 0.700 - / 0.775 - / 0.825 - / 0.825 Continuing Continuing / - - / 1.150 - / 0.700 - / 0.775 - / 0.825 - / 0.825 Continuing Continuing 4.086 Continuing Continuing 2.3) DSA Subtotal: Support - Installation Modification Item 1 of 1: Key Management (KM) Ashore (DA005) - / 5.525 - / 1.250 - / 1.000 - / 1.150 Subtotal: Installation - / 5.525 - / 1.250 - / 1.000 - / 1.150 - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 73.754 5.767 5.841 5.384 0.000 UNCLASSIFIED Page 31 of 39 5.384 4.495 4.848 P-1 Line #82 4.007 Volume 2 - 809 === page 890 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Key Management (KM) - Ashore (DA005) MDAP/MAIS Code: Modification Item 1 of 1: Key Management (KM) - Ashore (DA005) Manufacturer Information Manufacturer Name: Key Load Device - Sierra Nevada Corporation Manufacturer Location: Sparks, NV Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jun 2025 Jun 2026 Jun 2027 FY 2028 Delivery Dates Dec 2025 Dec 2026 Dec 2027 Manufacturer Name: Key Management Infrastructure (KMI) NSA Mandated Updates FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Fort Meade, MD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2025 Jan 2026 Jan 2027 Delivery Dates Oct 2025 Oct 2026 Oct 2027 FY 2029 Installation Information Method of Implementation: Installed:: Installation Name: Key Management (KM) - Ashore Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 233 / 5.525 50 / 1.250 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 40 / 1.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 40 / 1.000 46 / 1.150 - / - - / - - / - - / - 0 / 0.000 46 / 1.150 28 / 0.700 - / - - / - - / - 0 / 0.000 28 / 0.700 31 / 0.775 - / - - / - 0 / 0.000 31 / 0.775 33 / 0.825 - / - 0 / 0.000 33 / 0.825 33 / 0.825 0 / 0.000 33 / 0.825 FY 2025 - / - - / - FY 2026 - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 33 / 0.825 Continuing Continuing Total 233 / 5.525 LI 3415 - Info Systems Security Program (ISSP) Navy 50 / 1.250 40 / 1.000 46 / 1.150 46 / 1.150 0 / 0.000 0 / 0.000 UNCLASSIFIED Page 32 of 39 46 / 1.150 28 / 0.700 31 / 0.775 P-1 Line #82 33 / 0.825 35 / 0.875 35 / 0.875 Volume 2 - 810 === page 891 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Key Management (KM) - Ashore (DA005) MDAP/MAIS Code: Modification Item 1 of 1: Key Management (KM) - Ashore (DA005) Installation Information Method of Implementation: Installed:: Installation Name: Key Management (KM) - Ashore Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 233 12 13 13 12 10 11 11 8 13 12 11 10 8 9 6 5 8 7 9 7 7 8 10 8 8 8 9 8 Cont. Cont. Out 233 12 13 13 12 10 11 11 8 13 12 11 10 8 9 6 5 8 7 9 7 7 8 10 8 8 8 9 8 Cont. Cont. Method of Implementation (Organic): Key Load Device - Not Installed Q4 TC Tot Installation Quantity: 0 Footnotes: (21) FY27 decrease in quantity reflects current projected need and planned installations to Fleet due to NSA mandate. KMI TR cost increases account for inflation, increased engineering & integration costs, and varies due to economy of scale procurement buys. (22) FY27 increased Key Loader quantity due to the need to replenish the fleet with key-fill devices required to conduct secure, mission-critical communications. Quantities fluctuate to remain within the Inventory Objective Capability (IOC). (23) FY27 decrease reflects current projected need and planned installations due to NSA mandate. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 33 of 39 P-1 Line #82 Volume 2 - 811 === page 892 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / SHARKCAGE - Afloat (DA070) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 13.319 14.571 11.106 0.000 11.106 15.871 17.586 15.964 126.718 126.718 126.718 - - - - - - - - 13.319 14.571 11.106 0.000 11.106 15.871 17.586 15.964 - - - - - - - - 13.319 14.571 11.106 0.000 11.106 15.871 17.586 15.964 To FY 2031 Complete 17.335 Continuing - Continuing - 17.335 Continuing - Total - Continuing - - 17.335 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: SHARKCAGE is a global, federated Defensive Cyberspace Operations (DCO) enclave consisting of sensor nodes, DCO analysis workbenches, and analytic nodes. Utilizing one-way passive taps in a protected, isolated, classified environment, SHARKCAGE consolidates cyber event data from multiple platforms and networks, providing Navy DCO forces with a shared environment and common platform for integrated workflow, collaboration, and analysis. SHARKCAGE efficiently detects, correlates, and analyzes nation and non-nation state attacks against maritime data and the Naval Networking Environment (NNE). SHARKCAGE afloat suites include laptops, servers, switches, storage, network taps/cables, and forensic equipment to enable deployed DCO forces to conduct localized mobile analysis. Afloat suites also include hardware and software for enhanced data correlation tools, ancillary devices, and other related security tools. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 34 of 39 P-1 Line #82 Volume 2 - 812 === page 893 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Ship, Sub Related RDT&E PEs: 0303140N Modification Type: Initial Prior Years Financial Plan Modification Number / Title: 6 / SHARKCAGE - Afloat (DA070) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SHARKCAGE - Afloat (DA070) A Kits Recurring 1.1.1) SHARKCAGE Afloat Suite - NonOrganic 198 / 49.500 1.1.2) SHARKCAGE Afloat Suite 2.0 - NonOrganic Subtotal: Recurring Subtotal: SHARKCAGE - Afloat (DA070) Subtotal: Procurement, All Modification Items - 2 / 1.700 / 51.200 - / 7.650 - 200 / 51.200 - / - 9 / 7.650 9 / 7.650 - / - - 10 / 8.500 / 8.500 - / - - / - - 8 / 6.800 - / - 8 / 6.800 / 6.800 - / - 8 / 6.800 - / - - 10 / 8.500 / / 6.800 - 8 / 6.800 - / - 11 / 9.350 / 9.350 - 11 / 9.350 / 51.200 - / 7.650 - / 8.500 - / 6.800 - / - - / 6.800 - / 9.350 - / - 12 / 10.200 / 10.200 - 12 / 10.200 - - / - 11 / 9.350 / 9.350 - 11 / 9.350 / 10.200 - / 9.350 - / - 198 / 0.000 396 / 49.500 12 / 10.200 Continuing Continuing / 10.200 Continuing Continuing 12 / 10.200 Continuing Continuing / 10.200 Continuing Continuing - - Support (All Modification Items) 2.1) Train-the-Trainer - / 0.125 - / 0.150 - / 0.150 - / 0.150 - / - - / 0.150 - / 0.150 - / 0.150 - / 0.150 - / 0.150 Continuing Continuing 2.2) Production Support - / 0.023 - / 0.344 - / 0.345 - / 0.275 - / - - / 0.275 - / 0.351 - / 0.351 - / 0.351 - / 0.351 Continuing Continuing 2.3) DSA - / 0.100 / - - / - 2.4) DSA 2.0 - / 0.100 - / 0.450 - / 0.500 - / 0.381 - / - - / 0.381 - / 0.550 - / 0.600 - / 0.600 Subtotal: Support - / 0.348 - / 0.944 - / 0.995 - / 0.806 - / - - / 0.806 - / 1.051 - / 1.101 - / 0.000 - / 3.500 - / 5.470 - / 6.285 / - - / 3.500 - / 5.470 - / 6.285 - / - - / - - - / - - / - - / - - / - - / - - / - - / 0.100 - / 0.600 - / - - / 3.781 / 1.101 - / 1.101 Continuing Continuing - / 5.513 - / 6.034 Continuing Continuing - / 5.513 - / 6.034 Continuing Continuing 17.335 Continuing Continuing Installation Modification Item 1 of 1: SHARKCAGE - Afloat (DA070) - / 75.170 - / 4.725 - / 5.076 - / 3.500 Subtotal: Installation - / 75.170 - / 4.725 - / 5.076 - / 3.500 - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 126.718 13.319 14.571 11.106 0.000 UNCLASSIFIED Page 35 of 39 11.106 15.871 17.586 P-1 Line #82 15.964 Volume 2 - 813 === page 894 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / SHARKCAGE - Afloat (DA070) MDAP/MAIS Code: Modification Item 1 of 1: SHARKCAGE - Afloat (DA070) Manufacturer Information Manufacturer Name: SHARKCAGE Equipment - Naval Information Warfare Center (NIWC) Pacific Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: Installed:: Installation Name: SHARKCAGE - Afloat (DA070) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - 200 / 75.170 Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 200 / 75.170 - / - 9 / 4.725 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 4.725 FY 2026 - / - - / - 10 / 5.076 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 5.076 FY 2027 - / - - / - - / - 8 / 3.500 0 / 0.000 8 / 3.500 - / - - / - - / - - / - 0 / 0.000 8 / 3.500 FY 2028 - / - - / - - / - - / - - / - - / - 11 / 5.470 - / - - / - - / - 0 / 0.000 11 / 5.470 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 6.285 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 11 / 5.513 - / - 0 / 0.000 11 / 5.513 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 6.034 0 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 200 / 75.170 9 / 4.725 10 / 5.076 8 / 3.500 0 / 0.000 8 / 3.500 12 / 6.285 11 / 5.470 12 / 6.285 - 11 / 5.513 12 / 6.034 / - Continuing Continuing 12 / 6.034 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 200 - 9 - - - 10 - - - 8 - - - 11 - - - 12 - - - 11 - - - 12 - - Cont. Cont. Out 200 - 9 - - - 10 - - - 8 - - - 11 - - - 12 - - - 11 - - - 12 - - Cont. Cont. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 36 of 39 P-1 Line #82 Tot Volume 2 - 814 === page 895 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / SHARKCAGE - Ashore (DA070) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 63.086 16.705 16.572 16.360 0.000 16.360 16.639 17.089 17.775 - - - - - - - - - 63.086 16.705 16.572 16.360 0.000 16.360 16.639 17.089 17.775 - - - - - - - - - 63.086 16.705 16.572 16.360 0.000 16.360 16.639 17.089 17.775 To FY 2031 Complete 17.059 Continuing - Continuing - 17.059 Continuing - Total - Continuing - - 17.059 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: SHARKCAGE ashore suites represent multiple SHARKCAGE architectures and variants that are specifically designed to each site in accordance with Fleet and Defensive Cyber Operations (DCO) requirements based on emergent threats in the tactical environment. Capabilities provided include network tapping, sensing, and analytic toolsets for passively monitoring multiple Navy networks to detect and assess cyber threats across multiple security enclaves. Ashore sites include Navy Cyber Defense Operations Command (NCDOC), Navy Information Operations Commands (NIOC), Fleet Cyber Command/Commander Tenth Fleet (FCC/C10F), other mission requirements (Details held at a Higher Classification), Ballistic Missile Defense (BMD) (i.e., Aegis Ashore), and SHARKCAGE production labs, as well as other network concentration facilities. SHARKCAGE procures equipment to include: hardware, software, servers, data storage, taps, switches, laptops, and ancillary systems that provide the following capabilities: passive network sensor nodes that collect live network traffic and use signature-based and heuristic Intrusion Detection Systems (IDS) to conduct initial analysis and alerting; analytic nodes which consist primarily of systems supporting ingest, storage, retention, retrieval, correlation, and real-time alerting of network traffic Packet Capture (PCAP) and event data; and analysis workbenches which provide an environment of tools for DCO analysts to support all aspects of the DCO mission, local to DCO forces at FCC/C10F, NCDOC, NIOC, Naval Computer and Telecommunications Stations (NCTS), and Naval Computer and Telecommunications Area Master Stations (NCTAMS). SHARKCAGE NCDOC Suite is the primary ashore site that supports the entire Navy enterprise and provides the capability to analyze active cyber threats and take actions to contain/stop actual or potential threat activities. SHARKCAGE Analytic Suite provides a regional/Area of Responsibility (AoR) capability to analyze active cyber threats and take actions to contain/stop actual or potential threat activities. SHARKCAGE Sensor Suite provide operators with the ability to conduct data ingest, data storage, data retention, data retrieval, data correlation, and real-time alerting of event-based data to support the DCO mission. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 37 of 39 P-1 Line #82 Volume 2 - 815 === page 896 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Shore Related RDT&E PEs: 0303140N Modification Type: Various Prior Years Financial Plan Modification Number / Title: 7 / SHARKCAGE - Ashore (DA070) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: SHARKCAGE - Ashore (DA070) B Kits Recurring 1.1.1) SHARKCAGE NCDOC Suite - NonOrganic 2 / 14.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.2) SHARKCAGE Sensor Suite - NonOrganic 25 / 8.125 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1.1.3) SHARKCAGE Analytic Suite 2.0 - NonOrganic 5 / 24.000 3 / 14.400 - / - 1.1.4) SHARKCAGE Sensor Suite 2.0 - NonOrganic Subtotal: Recurring Subtotal: SHARKCAGE - Ashore (DA070) Subtotal: Procurement, All Modification Items 3 / 14.400 2 / 0.650 / 47.175 - - 34 / 47.175 / 47.175 - / - / 14.400 - 3 / 14.400 - 3 / 14.400 / 14.400 - / - / 14.400 - - 3 / 14.400 / 14.400 - / - - / - / 14.400 - / - 3 / 14.400 - / - / 14.400 - / - - - 3 / 14.400 - / - / 14.400 - 3 / 14.400 - 3 / 14.400 / 14.400 - / - / 14.400 - 3 / 14.400 - 3 / 14.400 / 14.400 - / - / 14.400 - 3 / 14.400 1 / 0.325 / 14.400 / 14.725 - 3 / 14.400 - 3 / 14.400 - / 14.725 - 25 / 8.125 Continuing Continuing / - Continuing Continuing / 14.400 Continuing Continuing 3 / 14.400 Continuing Continuing / 14.400 Continuing Continuing - 4 / 14.725 2 / 14.400 - Support (All Modification Items) 2.1) Train-the-Trainer - / 0.125 - / 0.150 - / 0.150 - / 0.150 - / - - / 0.150 - / 0.150 - / 0.150 - / 0.150 - / 0.150 Continuing Continuing 2.2) Production Support - / 1.211 - / 0.550 - / 0.550 - / 0.337 - / - - / 0.337 - / 0.550 - / 0.550 - / 0.585 - / 0.519 Continuing Continuing 2.3) DSA - / 0.720 / - - / - 2.4) DSA Analytic Suite 2.0 - / 0.530 / 0.339 - / - 2.5) DSA Sensor Suite 2.0 - / 0.190 / - - / - - / 2.776 - / 1.030 - / 1.038 - / 0.826 - / - - / 0.826 - / 1.039 - / 1.039 - / 1.075 - / 0.000 - / 1.134 - / 1.200 - / 1.650 - / 1.975 - / - - / 1.134 - / 1.200 - / 1.650 - / 1.975 - Subtotal: Support - / / 0.330 - - / - / / 0.338 - - / - - - / / 0.339 - - / - / / 0.339 - - / - / / 0.339 - - / - / / 0.340 - - / - - / - - / - - / 0.720 / 0.340 Continuing Continuing / - Continuing Continuing / 1.009 Continuing Continuing / 1.650 Continuing Continuing / 1.650 Continuing Continuing 17.059 Continuing Continuing Installation Modification Item 1 of 1: SHARKCAGE - Ashore (DA070) - / 13.135 - / 1.275 - / 1.134 - / 1.134 Subtotal: Installation - / 13.135 - / 1.275 - / 1.134 - / 1.134 - Total Total Cost (Procurement + Support + Installation) LI 3415 - Info Systems Security Program (ISSP) Navy 63.086 16.705 16.572 16.360 0.000 UNCLASSIFIED Page 38 of 39 16.360 16.639 17.089 P-1 Line #82 17.775 Volume 2 - 816 === page 897 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 3415 / Info Systems Security Program (ISSP) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / SHARKCAGE - Ashore (DA070) MDAP/MAIS Code: Modification Item 1 of 1: SHARKCAGE - Ashore (DA070) Manufacturer Information Manufacturer Name: SHARKCAGE Equipment - Naval Information Warfare Center (NIWC) Pacific Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Installation Information Method of Implementation: Installed:: Installation Name: SHARKCAGE - Ashore (DA070) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Continuing Continuing Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 34 / 13.135 - / - 3 / 1.275 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 1.275 FY 2026 - / - - / - 3 / 1.134 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 1.134 FY 2027 - / - - / - - / - 3 / 1.134 0 / 0.000 3 / 1.134 - / - - / - - / - - / - 0 / 0.000 3 / 1.134 FY 2028 - / - - / - - / - - / - - / - - / - 3 / 1.200 - / - - / - - / - 0 / 0.000 3 / 1.200 FY 2029 - / - - / - - / - - / - - / - - / - - / - 3 / 1.650 - / - - / - 0 / 0.000 3 / 1.650 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 1.975 - / - 0 / 0.000 4 / 1.975 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.650 0 / 0.000 3 / 1.650 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total 34 / 13.135 3 / 1.275 3 / 1.134 3 / 1.134 0 / 0.000 3 / 1.134 3 / 1.200 3 / 1.650 4 / 1.975 / - 3 / 1.650 / - Continuing - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 34 - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - - 1 3 - - 3 - - Cont. Cont. Out 34 - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - - 1 3 - - 3 - - Cont. Cont. LI 3415 - Info Systems Security Program (ISSP) Navy UNCLASSIFIED Page 39 of 39 P-1 Line #82 Tot Volume 2 - 817 === page 898 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 818 === page 899 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3417 / MIO Intel Exploitation Team Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 10.398 1.100 1.122 1.063 0.000 1.063 1.130 1.149 1.173 1.197 0.025 18.357 Total - - - - - - - - - - - - 10.398 1.100 1.122 1.063 0.000 1.063 1.130 1.149 1.173 1.197 0.025 18.357 - - - - - - - - - - - - 10.398 1.100 1.122 1.063 0.000 1.063 1.130 1.149 1.173 1.197 0.025 18.357 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: [P40A / 343SA - Maritime Interdiction Operations Intel Exploitation Team]: Tactical Electronic Warfare (EW) equipment is used in support of indications, warning, and force protection. Tactical EW systems provide the capability to collect data in both digital and analogue Radio Frequency (RF) environments. Specific collection capabilities include digital and analogue data collection with wireless signal exploitations; Specific Emitter Identification (SEI), which discerns unique attributes of specific radar; Satellite Communication capability; Wireless signal receiving capabilities to conduct surveys, to include telecom network mapping and geolocation, and capturing tactical signals intelligence (SIGINT); and Document and Media Exploitation allowing capture of media from electronic devices. LI 3417 - MIO Intel Exploitation Team Navy UNCLASSIFIED Page 1 of 4 P-1 Line #83 Volume 2 - 819 === page 900 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 15: Cryptographic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3417 / MIO Intel Exploitation Team Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a MIO Intel Exploitation Team P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 10.398 - / 1.100 - / 1.122 - / 1.063 - / 10.398 - / 1.100 - / 1.122 - / 1.063 - / - - / 1.063 / 0.000 - / 1.063 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request funds requirements for Electronic Warfare (EW) items for Navy Expeditionary Intelligence Command. Funding these EW systems is critical for enabling deployed teams to meet the highdemand electronic collection requirements of theater commanders against U.S. adversaries across multiple Areas of Responsibility (AORs). LI 3417 - MIO Intel Exploitation Team Navy UNCLASSIFIED Page 2 of 4 P-1 Line #83 Volume 2 - 820 === page 901 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3417 / MIO Intel Exploitation Team Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Aggregated Items Title: MIO Intel Exploitation Team Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) 343SA - Maritime Interdiction Operations Intel Exploitation Team 1.1) 343SA - Satellite Communications Equipment A 1.2) 343SA - Wireless Networks Mapping Equipment / Surveys A 1.3) 343SA - Wireless Networks Telcom Equipment A 1.4) 343SA - Specific Emitter Identification A Devices (†) 1.5) 343SA - Digital Collection Devices A 1.6) 343SA Tactical Electronic Warfare (TAC-EW) A (1)(†) 306.667 3 0.920 - - - - - - - - - - - - - - - 247.000 4 0.988 - - - - - - - - - - - - - - - 151.000 3 0.453 - - - - - - - - - - - - - - - 287.429 7 2.012 - - - - - - - - - - - - - - - 10 1.100 10 1.122 1.063 - - - - - 1.946 110.000 112.200 354.333 3 354.333 3 1.063 63.500 32 2.032 - - - - - - - - - - - - - - - 488.250 4 1.953 - - - - - - - - - - - - - - - 94.000 1 0.094 - - - - - - - - - - - - - - - (†) Dissemination 1.7) Digital Receiver Technology (DRT) 1301C+/Wireless A (†) Receiving Systems 1.8) LANSHARK 5 A Subtotal: 1) 343SA - Maritime Interdiction Operations Intel Exploitation Team - - 10.398 - - 1.100 - - 1.122 - - 1.063 - - - - - 1.063 Total - - 10.398 - - 1.100 - - 1.122 - - 1.063 - - - - - 1.063 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) The FY 2027 request funds requirements for Electronic Warfare (EW) items for Navy Expeditionary Intelligence Command. Funding these EW systems is critical for enabling deployed teams to meet the high-demand electronic collection requirements of theater commanders against U.S. adversaries across multiple Areas of Responsibility (AORs). LI 3417 - MIO Intel Exploitation Team Navy UNCLASSIFIED Page 3 of 4 P-1 Line #83 Volume 2 - 821 === page 902 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 15 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 3417 / MIO Intel Exploitation Team Method/Type or Funding Vehicle Aggregated Items: MIO Intel Exploitation Team Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 1) 343SA - Maritime Interdiction Operations Intel Exploitation Team 1.4) 343SA - Specific Emitter Identification Devices 2020 Prime Vendor / Various MIPR ** NO PCO ** May 2020 Jan 2021 4 247.000 N 2025 Digital Receiver Technology / UNKNOWN MIPR DL:A Mar 2025 Dec 2025 10 110.000 Y 2026 Digital Receiver Technology / UNKNOWN MIPR TBD May 2026 Feb 2027 10 112.200 Y 2027 Digital Receiver Technology / UNKNOWN MIPR TBD Apr 2027 Jan 2028 3 354.333 N 1.6) 343SA Tactical Electronic Warfare (TAC-EW) Dissemination 2022 Gov off the shelf / Various MIPR DLA Mar 2022 Sep 2023 4 244.250 Y Mar 2022 1.6) 343SA Tactical Electronic Warfare (TAC-EW) Dissemination 2023 Gov off the shelf / Various MIPR DLA Mar 2023 Dec 2024 28 37.670 N Feb 2023 1.7) Digital Receiver Technology (DRT) 1301C+/Wireless Receiving Systems 2024 Digital Receiver Technology / MARYLAND MIPR DLA Mar 2025 Sep 2025 3 359.333 Y Mar 2025 1.5) 343SA - Digital Collection Devices (1) 1.5) 343SA - Digital Collection Devices (1) 1.5) 343SA - Digital Collection Devices (1) LI 3417 - MIO Intel Exploitation Team Navy UNCLASSIFIED Page 4 of 4 P-1 Line #83 Sep 2020 Mar 2025 Volume 2 - 822 === page 903 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 16: Cryptologic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 240.399 240.399 240.399 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 15.506 7.841 7.419 0.000 7.419 7.905 8.035 8.187 - - - - - - - - 15.506 7.841 7.419 0.000 7.419 7.905 8.035 8.187 - - - - - - - - 15.506 7.841 7.419 0.000 7.419 7.905 8.035 8.187 To FY 2031 Complete 8.354 Continuing - Continuing - 8.354 Continuing - Total - Continuing - - 8.354 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Cryptologic Carry-On-Program (CCOP) procures state-of-the-art, commercial off-the-shelf Signals Intelligence (SIGINT) equipment (hardware and software) in response to combatant commander requirements for a quick-reaction surface, subsurface, and airborne cryptologic carry-on capability. The equipment is procured in accordance with requirements detailed in the shipboard Information Warfare / Cryptologic System Operational Requirements Document and specific execution year fleet requirements. These requirements are defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG), in concert with Shipboard Signals Exploitation Space (SSES) programs (includes Ship's Signal Exploitation Equipment Family of Systems) to ensure synergy and seamless transition to permanently installed systems. The FSDWG meets to determine which signals of interest (SOI)s/Targets on the FSDWG list need to be addressed. Due to a continually changing threat environment, detailed requirements are dynamic and equipment procured varies each year by quantity and type. Equipment suites can be configured for many targets and tasking. Target specific subsystems can either operate as stand-alone within the cryptologic spaces or as an add-on to existing equipment. Hardware procurements includes: receivers, recorders, tactical computers and related peripherals, antennas, electronic-warfare support measures systems, precision geolocation equipment, advanced signal and search equipment including spectrum analyzers and associated portable special intelligence communications equipment. CCOP equipment is installed as an augment to cryptologic capabilities on subsurface, surface, and air platforms. There are approximately 124 cryptologic capable surface ships and shore sites in the current Navy inventory. Each of these are potential users of this carry-on equipment, as are subsurface and air platforms. The temporary installation of equipment is coordinated through fleet augmentation requests and installed by fleet electronic support personnel. A primary system in inventory is the Carry On Radio Spectrum Analysis & Intelligence Reporting (CORSAIR) system. Funds continue to procure CORSAIR core architecture system upgrades to provide additional affordable functionality to the combatant commands. Additional signal acquisition equipment to address specific combatant command requirements include such systems as Digital Receiver Technology (DRT), Hostile forces Integrated Targeting Service (HITS), Maritime Toxic Pen (MTP), TURBULENTWAVE / TURBULENTWIND / TURBULENTSAIL / BLUESTREAM servers, RED FALCON, FIREFLY, NIMBLE TRACKER, SHEARWATER, CARBON STORM, XML to JREAP-C (X2J), TOXIC SMOKE, QUICKSHOT, SHOCKWAVE/WSTL, and Remote Analytical SIGINT Capability (RASCAL) equipment. Starting in FY 2026, CCOP consolidated into budget line item 2360 to group technology projects fostering innovation and efficiency. The U.S. Navy's Global Signals Analysis Laboratory (GSAL) program under project CLASSIC SENSEI provides technical management and resource allocation in support of worldwide Information Warfare (IW) operations. The GSAL program supports a global architecture of Signals Analysis Laboratories (SALs) distributed throughout the world in fleet centric and strategic Operating Areas (OPAREAs). The primary mission is to facilitate the National/Tactical Processing, Exploitation, and Dissemination (PED) of Technical Signals Intelligence (TechSIGINT) data collected within the maritime domain while simultaneously functioning as an extension of tactical assets forward deployed. The program's Mission, Functions, and Tasks (MF&T) are facilitated through the use of the RoNIN - Mission System. RoNIN represents a truly joint National/Tactical infrastructure solution that provides analysts throughout the Intelligence Community (IC) with direct and remote access to tactical mission payloads using both existing and cloud based analytical tools and resources. The GSAL program and the RoNIN - Mission System function as the backbone for U.S. Navy's worldwide TechSIGINT PED. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 1 of 13 P-1 Line #84 Volume 2 - 823 === page 904 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 16: Cryptologic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Fleet Information Operations Centers (FIOC) provide regionally focused Information Operation (IO) and Signal Intelligence (SIGINT) support to Fleet Commanders. FIOCs provide support for IO and SIGINT personnel augmentation in theater, analytical requests, and planning in support of deliberate and crisis action planning. FIOCs leverage capabilities, analysis, and manpower to support requirements. Additionally, FIOCs provide mission support for the CLASSIC REACH (CR) program by establishing a common, Integration Backbone (DIB)-compliant, Service Oriented Architecture framework for the hosting of network services enabling Distributed Signals Intelligence/Information Operations (SIGINT/IO). CR is the key enabler of SIGINT/IO future reach back and remoting operations from surface, airborne, and subsurface manned/unmanned platforms. Electronic Warfare (EW) Fleet Synthetic Trainer Consolidation provides architecture, systems and required life cycle management to improve staff operational planning and tactical decision-making, and overall intelligence team readiness and certification throughout the Optimized-Fleet Response Plan (O-FRP). This capability enhances units and strike groups in exercising integrated kinetic and non-kinetic capabilities to include operations and intelligence fusion required for comprehensive maritime operations and operational proficiency in Signals Intelligence (SIGINT), Electromagnetic Maneuver Warfare (EMW), and cyberspace operations. The capability supports Assured Command and Control (C2) and Cyber Situational Awareness/Cyber Defense and Enhanced Naval Network Environment (NNE) Information Dominance Integrated Prioritized Capabilities Lists (IPCLs). Fleet Synthetic Training (FST) Signals Intelligence / Counter - Intelligence, Surveillance, and Reconnaissance (SIGINT / C-ISR) provides the capability to exercise shipboard Top Secret-Sensitive Compartmented Information (TS-SCI) capabilities by expanding upon General Service (GENSER) Navy Continuous Training Environment (NCTE) capabilities to add Above GENSER architecture/capabilities. The capability enables staff operational planning and tactical decision-making and overall Intelligence team readiness and certification throughout the Optimized - Fleet Response Plan (O-FRP). [P5 / 1V045 CCOP Systems & Subsystems]: The Cryptologic Carry-On-Program (CCOP) procures state-of-the-art, commercial off-the-shelf Signals Intelligence (SIGINT) equipment (hardware and software) in response to combatant commander requirements for a quick-reaction surface, subsurface, and airborne cryptologic carry-on capability. [P5 / [USFFC CY] Global Signal Analysis Laboratory (GSAL)]: FY27 funds increased in the amount of ($0.017) due to sustainment of Signals Analysis Laboratories (SAL) integration for security and new technology requirements that facilitate technical analysis in diverse and contested electromagnetic environments. SALs are integral components of the Tech Signal Intelligence (SIGINT) Revitalization initiatives. [P5 / NAVIFOR System Integration & Installation of Hardware (FIOC) (09S)]: Funds provided for procurement and life cycle maintenance for Command/Control (C2) systems connected to Sensitive Compartmented Information (SCI) networks. Funds will maintain a common baseline of analytical intelligence software tools. [P5 / NAVIFOR EW Fleet Synthetic Trainer Consolidation (86D)]: Funds provided for Counter-Intelligence, Surveillance, Reconnaissance, Targeting (C-ISRT), Long-Range Fires and Live, Virtual, Constructive (LVC) Integrated Prioritized Capabilities Lists (IPCLs).This will give the ability to exercise shipboard Top Secret/Sensitive Compartmented Information (TS/SCI) capabilities in an environment not subject to counter-detection. [P5 / [USFFC N7] Tier 1 Life Cycle Management (LCM)]: Life cycle technical refresh must be completed every three (3) years for the life of the node. [P5 / [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation]: Shipboard installations provide capability for comprehensive maritime operations and operational proficiency in Signals Intelligence (SIGINT), Electromagnetic Maneuver Warfare (EMW), and cyberspace operations. [P5 / [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM)]: Life cycle maintenance required to sustain installed unit readiness. [P5 / [USFFC N7] Fleet Training Wholeness (FTW)]: Installation support for permanent shipboards systems, technical refresh of interim capability Portable Embarkation Kits (PEKs), and fluctuations in the locations of installations. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 2 of 13 P-1 Line #84 Volume 2 - 824 === page 905 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 16: Cryptologic Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Cryptologic Communications Equip P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 240.399 - / 15.506 - / 7.841 - / 7.419 - / 0.000 - / 7.419 - / 240.399 - / 15.506 - / 7.841 - / 7.419 - / 0.000 - / 7.419 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget will procure the following: (2.1) Global Signal Analysis Laboratory (GSAL): - Funding sustains Signals Analysis Laboratories (SAL) integration for security and new technology requirements that facilitate technical analysis in diverse and contested electromagnetic environments. SALs are integral components of the Tech Signal Intelligence (SIGINT) Revitalization initiatives. (3.1.1) System Integration and Installation of Hardware (FIOC): - Funds provided for procurement and life cycle maintenance for Command/Control (C2) systems connected to Sensitive Compartmented Information (SCI) networks. Funds will maintain a common baseline of analytical intelligence software tools. (4.1.1) Electronic Warfare (EW) Fleet Synthetic Trainer Consolidation: - Funds provided for Counter- Intelligence, Surveillance, Reconnaissance, Targeting (C-ISRT), Long-Range Fires and Live, Virtual, Constructive (LVC) Integrated Prioritized Capabilities Lists (IPCLs). This will give the ability to exercise shipboard Top Secret/Sensitive Compartmented Information (TS/SCI) capabilities in an environment not subject to counter-detection. (5.1.2) Tier 1 Life Cycle Management (LCM): FY27 funds ($0.030M) decrease due to reduction of tech refresh requirement (5.1.3) SIGINT / C-ISR Systems - Permanent Shipboard Installation: FY27 funds ($0.068M) decrease due to software and hardware LCM requirements. (5.1.4) SIGINT / C-ISR Systems- Life Cycle Management (LCM): FY27 funds ($0.018M) decrease due to software and hardware LCM requirements. (5.1.5) Fleet Training Wholeness (FTW): FY27 funds ($0.179M) decrease due to software and hardware LCM requirements. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 3 of 13 P-1 Line #84 Volume 2 - 825 === page 906 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 15.506 7.841 7.419 0.000 7.419 - Gross/Weapon System Cost ($ in Millions) 240.399 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 240.399 Plus CY Advance Procurement ($ in Millions) - - - - - 15.506 7.841 7.419 0.000 7.419 - Total Obligation Authority ($ in Millions) 240.399 FY 2027 Total - - - - - 15.506 7.841 7.419 0.000 7.419 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware - 1V045 CCOP Systems & Subsystems Cost Recurring Cost 1.1.1) CCOP Systems (†) & Subsystems Subtotal: Recurring Cost Subtotal: Hardware 1V045 CCOP Systems & Subsystems Cost 252.291 726 183.163 - - 183.163 - - 259.536 28 7.267 - - - - - - - - - - - - - - 7.267 - - - - - - - - - - - - 183.163 - - 7.267 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.837 - - - Hardware - Global Signal Analysis Laboratory (60) Cost Recurring Cost 2.1.1) [USFFC ID] Global Signal Analysis Laboratory (GSAL) 2.1.2) [USFFC CY] Global Signal Analysis (†) Laboratory (GSAL) 1,125.125 8 9.001 2,455.000 1 2.455 867.000 1 0.867 885.000 1 0.885 837.000 1 837.000 1 0.837 Subtotal: Recurring Cost - - 11.456 - - 0.867 - - 0.885 - - 0.837 - - - - - 0.837 Subtotal: Hardware - Global Signal Analysis Laboratory (60) Cost - - 11.456 - - 0.867 - - 0.885 - - 0.837 - - - - - 0.837 0.717 - - - Hardware - [USFFC ID] GDX6D - System Integration and Installation of Hardware Cost Recurring Cost 3.1.1) NAVIFOR System Integration & Installation of 711.875 8 5.695 LI 3501 - Cryptologic Communications Equip Navy 754.000 1 0.754 764.000 1 0.764 UNCLASSIFIED Page 4 of 13 717.000 1 P-1 Line #84 717.000 1 0.717 Volume 2 - 826 === page 907 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware (FIOC) (09S) (†) (1) Subtotal: Recurring Cost - - 5.695 - - 0.754 - - 0.764 - - 0.717 - - - - - 0.717 Subtotal: Hardware [USFFC ID] GDX6D System Integration and Installation of Hardware Cost - - 5.695 - - 0.754 - - 0.764 - - 0.717 - - - - - 0.717 0.653 - - - Hardware - [USFFC ID] EW Fleet Synthethic Trainer Consolidation Cost Recurring Cost 4.1.1) NAVIFOR EW Fleet Synthetic Trainer (†) Consolidation (86D) 456.667 6 2.740 667.000 1 0.667 685.000 1 0.685 653.000 1 653.000 1 0.653 (2) Subtotal: Recurring Cost Subtotal: Hardware [USFFC ID] EW Fleet Synthethic Trainer Consolidation Cost - - 2.740 - - 0.667 - - 0.685 - - 0.653 - - - - - 0.653 - - 2.740 - - 0.667 - - 0.685 - - 0.653 - - - - - 0.653 - - - - - - - - - - - - - - - Hardware - [USFFC N7] Fleet Synthetic Training (FST) SIGINT / C-ISR Cost Recurring Cost 5.1.1) [USFFC N7] Tier 1 TS/SCI NCTE & VOIP Procurement & 545.500 4 2.182 239.429 7 1.676 311.000 1 0.311 327.000 1 0.327 297.000 1 0.297 - - - 297.000 1 0.297 154.133 90 13.872 1,256.000 1 1.256 79.500 16 1.272 75.250 16 1.204 - - - 75.250 16 1.204 4.979 233 1.160 4.530 75 0.340 4.600 75 0.345 4.087 80 0.327 - - - 4.087 80 0.327 3,476.667 3 10.430 3,517.000 1 3.517 3,563.000 1 3.563 3,384.000 1 3.384 - - - 3,384.000 1 3.384 (†) Installation 5.1.2) [USFFC N7] Tier 1 Life Cycle (†) Management (LCM) (3) 5.1.3) [USFFC N7] SIGINT / CISR Systems Permanent Shipboard (†) (4) Installation 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle (†) Management (LCM) (5) 5.1.5) [USFFC N7] Fleet Training Wholeness (FTW) (6) LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 5 of 13 P-1 Line #84 Volume 2 - 827 === page 908 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 29.320 - - 5.424 - - 5.507 - - 5.212 - - - - - 5.212 Subtotal: Hardware [USFFC N7] Fleet Synthetic Training (FST) SIGINT / CISR Cost - - 29.320 - - 5.424 - - 5.507 - - 5.212 - - - - - 5.212 Support - 1V555 Production Support Cost 6.1) Production Support - - 8.025 - - 0.527 - - - - - - - - - - - - Subtotal: Support - 1V555 Production Support Cost - - 8.025 - - 0.527 - - - - - - - - - - - - Gross/Weapon System Cost - - 240.399 - - 15.506 - - 7.841 - - 7.419 - - 0.000 - - 7.419 (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) FY27 decrease is due to inflation rates for Non-Pay and Non-Fuel Purchases. FY27 decrease is due to inflation rates for Non-Pay and Non-Fuel Purchases. FY27 funds ($0.030M) increase due to reduction of tech refresh requirement FY27 funds ($0.068M) decrease due to software and hardware LCM requirements. FY27 funds ($0.018M) decrease due to software and hardware LCM requirements. FY27 funds ($0.179M) decrease due to software and hardware LCM requirements. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 6 of 13 P-1 Line #84 Volume 2 - 828 === page 909 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements 1.1.1) CCOP Systems & O O C FY Contractor and Location (7) P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 2025 VARIOUS / VARIOUS C / CPFF NIWC PAC/NIWC LANT Feb 2025 Jul 2025 28 259.536 N 2.1.2) [USFFC CY] Global Signal Analysis Laboratory (GSAL) 2024 PARAGON MICRO INC / LAKE ZURICH, IL C / FFP Fleet Logistics Center Norfolk, VA Jan 2024 May 2024 1 852.000 Y Dec 2023 2.1.2) [USFFC CY] Global Signal Analysis Laboratory (GSAL) 2025 PARAGON MICRO INC / LAKE ZURICH, IL C / FFP Fleet Logistics Center Norfolk, VA Mar 2025 Jul 2025 1 867.000 Y Dec 2024 2.1.2) [USFFC CY] Global Signal Analysis Laboratory (GSAL) 2026 PARAGON MICRO INC / LAKE ZURICH, IL C / FFP Fleet Logistics Center Norfolk, VA Mar 2026 Jul 2026 1 885.000 N Jul 2026 Dec 2025 3.1.1) NAVIFOR System Integration & Installation of Hardware (FIOC) (09S) 2024 NAVWAR / San Diego C / FFP NSA Oct 2023 Oct 2023 1 739.000 N Oct 2024 Oct 2023 3.1.1) NAVIFOR System Integration & Installation of Hardware (FIOC) (09S) 2025 NAVWAR / San Diego C / FFP NSA Oct 2024 Oct 2024 1 754.000 N Oct 2025 Oct 2024 3.1.1) NAVIFOR System Integration & Installation of Hardware (FIOC) (09S) 2026 NAVWAR / San Diego C / FFP NSA Oct 2025 Oct 2025 1 764.000 N Oct 2026 Oct 2025 3.1.1) NAVIFOR System Integration & Installation of Hardware (FIOC) (09S) 2027 NAVWAR / San Diego C / FFP NSA Oct 2026 Oct 2026 1 717.000 N Oct 2027 Oct 2026 4.1.1) NAVIFOR EW Fleet Synthetic Trainer Consolidation (86D) 2024 SSC PAC / San Diego Various NAVWAR San Diego Oct 2023 Oct 2023 1 655.000 N Feb 2024 Oct 2023 4.1.1) NAVIFOR EW Fleet Synthetic Trainer Consolidation (86D) 2025 SSC PAC / San Diego Various NAVWAR San Diego Oct 2024 Oct 2024 1 667.000 N Feb 2025 Oct 2024 4.1.1) NAVIFOR EW Fleet Synthetic Trainer Consolidation (86D) 2026 SSC PAC / San Diego Various NAVWAR San Diego Oct 2025 Oct 2025 1 685.000 N Feb 2026 Oct 2025 4.1.1) NAVIFOR EW Fleet Synthetic Trainer Consolidation (86D) 2027 SSC PAC / San Diego Various NAVWAR San Diego Oct 2026 Oct 2026 1 653.000 N Feb 2027 Oct 2026 5.1.1) [USFFC N7] Tier 1 TS/SCI NCTE & VOIP Procurement & Installation 2023 Alion Science & Technology / McLean, VA C / TBD DITC Oct 2022 Oct 2022 1 841.000 N Oct 2022 Oct 2022 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2022 Alion Science & Technology / McLean, VA C / FFP DTIC Jan 2022 Jan 2022 1 202.000 N Jan 2022 Oct 2021 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2023 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2022 Oct 2022 1 267.000 N Oct 2022 Oct 2022 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2024 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2023 Oct 2023 1 303.000 N Oct 2023 Oct 2023 Subsystems (†) LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 7 of 13 P-1 Line #84 Apr 2025 Oct 2024 Volume 2 - 829 === page 910 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements O O C P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2025 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2024 Oct 2024 1 311.000 N Oct 2024 Oct 2024 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2026 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2025 Oct 2025 1 327.000 N Oct 2025 Oct 2025 5.1.2) [USFFC N7] Tier 1 Life Cycle Management (LCM) 2027 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2026 Oct 2026 1 297.000 N Oct 2026 Oct 2026 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2022 Alion Science & Technology / McLean, VA C / FFP DTIC Jan 2022 Jan 2022 31 57.742 N Jan 2022 Oct 2021 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2023 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2022 Oct 2022 15 631.067 N Oct 2022 Oct 2022 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2024 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2023 Oct 2023 18 68.444 N Oct 2023 Oct 2023 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2025 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2024 Oct 2024 1 1,256.000 N Oct 2024 Oct 2024 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2026 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2025 Oct 2025 16 79.500 N Oct 2025 Oct 2025 5.1.3) [USFFC N7] SIGINT / C-ISR Systems - Permanent Shipboard Installation 2027 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2026 Oct 2026 16 75.250 N Oct 2026 Oct 2026 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) 2022 Alion Science & Technology / McLean, VA C / FFP DTIC Jan 2022 Jan 2022 51 4.941 N Jan 2022 Oct 2021 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) 2023 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2022 Oct 2022 66 4.650 N Oct 2022 Oct 2022 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) 2024 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2023 Oct 2023 72 4.645 N Oct 2023 Oct 2023 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) 2025 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2024 Oct 2024 75 4.530 N Oct 2024 Oct 2024 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) 2026 Alion Science & Technology / McLean, VA C / TBD DTIC Oct 2025 Oct 2025 75 4.600 N Oct 2025 Oct 2025 LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 8 of 13 P-1 Line #84 (Each) Volume 2 - 830 === page 911 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements 5.1.4) [USFFC N7] SIGINT / C-ISR Systems - Life Cycle Management (LCM) (†) O O C FY Contractor and Location 2027 Alion Science & Technology / McLean, VA P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Method/Type or Funding Vehicle C / TBD Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Location of PCO Award Date Date of First Delivery DTIC Oct 2026 Oct 2026 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 80 4.087 N Oct 2026 RFP Issue Date Oct 2026 indicates the presence of a P-21 Footnotes: (7) Cryptologic Carry-on Program (CCOP) equipment is procured according to the overall requirements detailed in the Shipboard Information Warfare/Cryptologic System Operational Requirements Document and specific execution year fleet requirements as defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG). Due to a continually changing threat environment, detailed requirements are dynamic, contract award timelines and equipment procured varies each year by quantity and type. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 9 of 13 P-1 Line #84 Volume 2 - 831 === page 912 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) CCOP Systems & Subsystems Prior Years Deliveries: 726 1 2025 NAVY 28 0 28 28 LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 10 of 13 P-1 Line #84 Volume 2 - 832 === page 913 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT B A L A N C E Fiscal Year 2025 Calendar Year 2024 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) CCOP Systems & Subsystems Prior Years Deliveries: 726 1 2025 NAVY 28 0 28 A - LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 11 of 13 F E B P-1 Line #84 M A R A P R M A Y J U N 4 J U L 3 A U G 3 18 S E P Volume 2 - 833 === page 914 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R Calendar Year 2027 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) CCOP Systems & Subsystems Prior Years Deliveries: 726 1 2025 NAVY 28 10 18 3 O C T 3 N O V LI 3501 - Cryptologic Communications Equip Navy 3 D E C 3 J A N 3 F E B 3 M A R 0 UNCLASSIFIED Page 12 of 13 P-1 Line #84 Volume 2 - 834 === page 915 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3501 / Cryptologic Communications Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 16 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Cryptologic Communications Equip Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 VARIOUS (7) - VARIOUS 1 40 90 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 4 5 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 4 Total After Oct 1 5 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (7) Cryptologic Carry-on Program (CCOP) equipment is procured according to the overall requirements detailed in the Shipboard Information Warfare/Cryptologic System Operational Requirements Document and specific execution year fleet requirements as defined by Fleet Cyber Command (FCC)/Commander TENTH Fleet (C10F) Fleet Signals Development Working Group (FSDWG). Due to a continually changing threat environment, detailed requirements are dynamic, contract award timelines and equipment procured varies each year by quantity and type. LI 3501 - Cryptologic Communications Equip Navy UNCLASSIFIED Page 13 of 13 P-1 Line #84 Volume 2 - 835 9 === page 916 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 836 === page 917 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 17: Other Electronic Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 444.716 444.716 444.716 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 49.523 58.764 67.106 0.000 67.106 67.179 65.670 67.120 - - - - - - - - 49.523 58.764 67.106 0.000 67.106 67.179 65.670 67.120 To FY 2031 Complete - Total - 67.504 Continuing - Continuing - 67.504 Continuing - Continuing - - - - - - - - - - 49.523 58.764 67.106 0.000 67.106 67.179 65.670 67.120 67.504 Continuing Continuing 20.637 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 6.794 - 0.798 - 0.798 2.850 11.680 22.227 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Coast Guard Equipment line funds the sensors of the Navy-Type/Navy-Owned Coast Guard Combat System Suite for United States Coast Guard (USCG) cutters under the Coast Guard Surface Acquisition Program. Under an inter-service agreement (delineated in OPNAVINST 4000.79(Series)), Department of Navy (DON) plans, programs, and budgets for specific Navy military equipment, systems and logistic support requirements for Coast Guard units to ensure the Coast Guard is prepared to execute naval warfare tasks in consonance with US Navy units. Ship construction and installation costs are funded under the Department of Homeland Security appropriation. The Combat System Suite including weapons and sensors will be aligned with future naval ship building programs to support commonality among the two Service's systems and meet National Fleet objectives. The Combat System Suite must compliment and integrate with Navy Combat Systems. The suite is an appropriate balance of equipment to ensure the Coast Guard is prepared to accomplish the assigned Naval Operational Capabilities in concert with US Navy units. [P40A / CG001 - SPQ-9B RADAR]: Provides the AN/SPQ-9B radar for the Maritime Security Cutter, Large (WMSL) Class, aka the National Security Cutter (NSC), to track surface targets and low fliers in support of potential gun engagements. [P40A / CG002 IFF AIMS]: Provides the Identification Friend or Foe (IFF) System for the National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), the Offshore Patrol Cuter (OPC) Class, aka the Maritime Security Cutter, Medium (WMSM) and the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP). The AN/APX-123 Transponder is procured for the Fast Response Cutter (FRC) aka Patrol Coastal Cutter (WPC). [P40A / CG003 DECOYS MK 53]: Provides the MK 53 Decoy Launching System (DLS) for the National Security Cutter (NSC), aka the Maritime Security Cutter, Large (WMSL), Polar Security Cutter (PSC), the Offshore Patrol Cuter (OPC) Class, aka the Maritime Security Cutter, Medium (WMSM) and the Arctic Security Cutter (ASC) to provide soft-kill capability. [P40A / CG004 SLQ-32]: Provides the AN/SLQ-32 Electronic Warfare System and the Battle Force Electronic Warfare Trainer (BEWT) for the National Security Cutter (NSC) Class, aka the Maritime Security Cutter, Large (WMSL), to perform Electronic Support Measures to support soft-kill measures. LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 1 of 15 P-1 Line #91 Volume 2 - 837 === page 918 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 17: Other Electronic Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / CG005 MK 46/MK 20 OPTICAL SIGHT]: Provides the MK 46 Mod 1 Optical Sighting System (OSS) for the National Security Cutter. The MK 20 Electro-Optical Sighting System (EOSS) is procured for the National Security Cutter (NSC) and the Offshore Patrol Cutter (OPC). These sighting systems are components of the MK48 Gun Weapon System (GWS) and provide fire control optical daytime and thermal imaging (infrared) sensor, and laser range finding to support engagements of hostile surface and air targets. [P40A / CG006 COMBAT SYSTEM INTEGRATION]: Ensures successful integration and system interoperability of Navy type equipment that affects the Combat System of USCG NSCs (WMSLs), FRCs (WPCs), OPC (WMSMs), PSCs (WMSPs) and the 270' Medium Endurance Cutter (WMEC) modernization effort. [P40A / CG007 MULTI-MODE RADAR]: MMR will provide Air Surveillance, Surface Surveillance, GWS support and IFF Antenna functions for Offshore Patrol Cutter (OPC) and Polar Security Cutter (PSC). [P40A / CG008 ATHENA CCD]: ATHENA Control, Correlation & Display (CCD) System for the Offshore Patrol Cutter (OPC) and Polar Security Cutter (PSC). The ATHENA CCD uses existing AEGIS BSL 9, Common Source Library (CSL) code to control and display MMR and IFF data. The systems will also provide target queuing for Gun Weapon System engagement. ATHENA Combat System Control and Display integration supports software upgrade and hardware/software integration of the Technical Insertion (TI)-16 Common Display System for the MMR and IFF to provide data to the AN/SLQ-32(V)6 and the MK48 Gun Weapon System for target engagement on the Offshore Patrol Cutter (OPC), aka the Maritime Security Cutter, Medium (WMSM) and the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP). Includes safety, certification, technical documentation, and information assurance efforts. [P40A / OPC C4I]: Funds are required for the procurement of Command, Control, Communications, Computers, and Intelligence (PEO C4I) for the new OPC/NSC/PSC Class, the Coast Guard's highest acquisition priority. Under inter-service agreement, the Navy budgets for specific Navy military equipment, systems and logistic support requirements for Coast Guard units to ensure the Coast Guard is prepared to execute naval warfare tasks in consonance with US Navy units. Ship construction and installation costs are funded under the Department of Homeland Security appropriation. Specific C4I systems to be procured include: ARC-210 Radios; OE-570D Antenna ; MIDS-On Ship(MOS) Mod; Navy Modular Automated Communications System (AN/SYQ-26); OA-9277A Antenna Coupler; FleetBroadcast; and Command and Control Processor (C2P) AN/UYQ-120. LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 2 of 15 P-1 Line #91 Volume 2 - 838 === page 919 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 17: Other Electronic Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Coast Guard Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 444.716 - / 49.523 - / 58.764 - / 67.106 - / 444.716 - / 49.523 - / 58.764 - / 67.106 - / - - / 67.106 / 0.000 - / 67.106 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding and inter-service agreements are used to procure Navy-Type/Navy-Owned (NT/NO) combat systems, support equipment, Integrated Logistics Support (ILS), certification, test and production support for United States Coast Guard (USCG) National Security Cutter (NSC), also known as the Maritime Security Cutter, Large (WMSL), the Offshore Patrol Cutter (OPC) Class, aka the Maritime Security Cutter, Medium (WMSM) and the Polar Security Cutter (PSC), aka the Maritime Security Cutter, Polar (WMSP), Fast Response Cutter (FRC), aka the Patrol Coastal Cutter (WPC), the Arctic Security Cutter (ASC) and the 270' Medium Endurance Cutter (WMEC) modernization effort being constructed under the Coast Guard's Surface Acquisition Program. Funding also supports Command, Control, Communications, Computers, and Intelligence (C4I) systems and associated logistic support for the Offshore Patrol Cutter. These efforts are ongoing. FY 2027 funding is provided for AN/SPQ-9B ILS for WMSLs; procure Identification, Friend or Foe (IFF) AN/APX-123(V) equipment, ILS and certification support for WPCs; procure IFF equipment and ILS support for WMSMs and WPCs; procure MK 53 Decoy Launching System (DLS) for WMSMs; procure the MK 20 Electro-Optical Sensor System (EOSS) and provide ILS/test support for WMSMs; provide combat system integration support for WMSLs, WPCs, PSCs and WMSMs; procure the Multi-mode Radar (MMR) for the WMSM program; procure ATHENA Control, Correlation & Display (CCD) System for WMSMs and provide combat system integration of the Technical Insertion TI-16 Common Display System and integration support for the ATHENA Control Correlation and Display (CCD) System. Program Executive Office Command, Control, Communications, Computers, and Intelligence (PEO C4I) FY 2027 funding is provided for the procurement of Navy Type Navy Owned (NT/NO) Command, Control, Communications, Computers, and Intelligence (C4I) equipment on National Security Cutter (NSC), Offshore Patrol Cutter (OPC) and Patrol Security Cutter (PSC) class ships to include: Cryptography (Crypto) Qty 2; Command & Control Processor (C2P) - Qty 2; ARC-210 Radios & Amps - Qty 24; OE-570 Ultra High Frequency Satellite Communications (UHF SATCOM) Antenna System - Qty 1; OA-9277A Ultra High Frequency (UHF) Coupler - Qty 2 and Multi-Functional Information Distribution (MIDS) On-Ship Modernization (MOS MOD) - Qty 1.". LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 3 of 15 P-1 Line #91 Volume 2 - 839 === page 920 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Coast Guard Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) CG001 - SPQ-9B RADAR 1.1) SPQ-9B ILS/ TEST SUPPORT (1) 1.2) SPQ-9B RADAR A - A - 3,994K - - 0.587 - - 0.580 - - 0.187 - - - - - 0.187 11.982 - - - - - - - - - - - - - - - - - 24.465 - - 0.587 - - 0.580 - - 0.187 - - - - - 0.187 - - 1.627 - - 0.150 - - 0.150 - - 0.082 - - - - - 0.082 - - 3.074 - - 0.255 - - 0.255 - - 0.140 - - - - - 0.140 97,946.43 56 5.485 0.276 - - - 470,800.00 10 4.708 - - - - 839,285.71 14 11.750 603,738.00 0.619 - - - - 2.924 - - 0.566 - - - - - Subtotal: 1) CG001 - SPQ-9B RADAR 3 12.483 2) CG002 IFF AIMS 2.1) IFF AIMS CERTIFICATION FRC A 2.2) IFF AIMS ILS A (2) (3) FRC 2.3) IFF AIMS (†) A EQUIPMENT FRC 2.4) IFF EQUIPMENT/ INCO SPARES A (†) OPC 2.5) IFF AIMS EQUIPMENT OPC A 2.6) IFF ILS OPC A 2.7) IFF AIMS A (4)(†) - - 0.259 - 1 88,000.00 - 3 0.264 - 0.604 609,666.67 - 3 0.540 - - 92,000.00 - 3 - 1.829 619,000.00 1 0.534 - - 92,000.00 - 3 - 619,000.00 0.276 - 1 0.619 0.566 1.224 - - - - - - - - - - - - - - - - - 0.500 - - 0.515 - - 0.515 - - 0.551 - - - - - 0.551 Subtotal: 2) CG002 IFF AIMS - - 31.292 - - 2.323 - - 3.547 - - 2.234 - - - - - 2.234 13 10.302 - - - 1 0.675 - - - 675,000.00 1 0.675 - - - - - - - - - 1 0.675 - - - 675,000.00 1 0.675 - - 9.417 - - 0.598 - - 0.604 - - 0.624 - - - - - 0.624 - - 19.719 - - 0.598 - - 1.859 - - 1.974 - - - - - 1.974 1,708K 12 20.492 - - - 2,679K 2.679 2,747K 2.747 - - - 2,747K - - 11.403 - - 2.716 - - 2.743 - - 2.890 - - - - - 2.890 21.612 - - - - - - - - - - - - - - - 53.507 - - 2.716 - - 5.422 - - 5.637 - - - - - 5.637 2.8) IFF ILS PSC 2 - 3 A (†) EQUIPMENT PSC 612,000.00 86,177.00 3) CG003 DECOYS MK 53 3.1) MK53 DLS OPC A 3.2) MK53 DLS PSC A 3.4) MK53 ILS/TEST SUPPORT A (5)(†) (6) 792,461.54 Subtotal: 3) CG003 DECOYS MK 53 627,500.00 2 1.255 675,000.00 675,000.00 5) CG005 MK 46/MK 20 OPTICAL SIGHT 5.1) MK20 (EOSS) A 5.2) ILS/TEST SUPPORT A 5.3) MK 46/MK 20 A (†) (†) NSC Subtotal: 5) CG005 MK 46/MK 20 OPTICAL SIGHT 4,322K - LI 3620 - Coast Guard Equipment Navy 5 - 1 UNCLASSIFIED Page 4 of 15 1 P-1 Line #91 1 2.747 Volume 2 - 840 === page 921 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Coast Guard Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 6) CG006 COMBAT SYSTEM INTEGRATION A - - 40.650 - - 5.616 - - 7.020 - - 7.371 - - - - - 7.371 Subtotal: 6) CG006 COMBAT SYSTEM INTEGRATION 6.1) CSI - - 40.650 - - 5.616 - - 7.020 - - 7.371 - - - - - 7.371 9,044K 12 108.525 16.113 - - - - - 22.927 - - 3.651 - - 3.724 - - 3.886 - - - - - 3.886 - - 131.452 - - 16.597 - - 19.677 - - 19.999 - - - - - 19.999 - - 53.125 - - 11.305 - - 11.863 - - 12.679 - - - - - 12.679 14.852 3,807K 3.807 3,845K 3.845 4,135K 4.135 - - - 4,135K - 67.977 - 15.112 - - 15.708 - 16.814 - - - - 14 0.863 63,000.00 1 0.063 - - - 2 0.133 - - - 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM A 7.2) MMR ILS/TEST SUPPORT A (†) Subtotal: 7) CG007 MULTI-MODE RADAR 12,946K 1 12.946 15,953K 1 15.953 16,113K 1 16,113K 1 16.113 8) CG008 ATHENA CCD 8.1) ATHENA CCD INTEGRATION A 8.2) ATHENA TI-16 A (†) HW Subtotal: 8) CG008 ATHENA CCD 10) OPC C4I 1,650K - 9 1 - 1 1 - 1 - 4.135 16.814 (7) 10.1) CRYPTO (8)(†) (9)(†) A A 61,642.86 66,250.00 66,250.00 2 0.133 1,160K 15 17.394 1,198K 1 1.198 - - - 1,232K 2 2.463 - - - 1,232K 2 2.463 10.3) ARC-210 (10)(†) A 282,174.60 126 35.554 284,584.00 12 3.415 - - - 312,000.00 24 7.488 - - - 312,000.00 24 7.488 10.4) OE-570D (11)(†) A 521,545.45 11 5.737 - - - 596,500.00 2 1.193 608,000.00 1 0.608 - - - 608,000.00 1 0.608 (†) A 355,000.00 12 4.260 - - - 430,000.00 2 0.860 438,500.00 2 0.877 - - - 438,500.00 2 0.877 (12)(†) A 314,166.67 12 3.770 - - - 308,000.00 1 0.308 - - - - - - - - - 421,384.62 13 5.478 - - - - - - - - - - - - - - 10.2) C2P 10.5) OA-9277A 10.6) NAVMACs 10.7) FLEET BROADCAST A (13)(†) A 2.598 1,298K 1.298 1,295K 2.590 1,320K 1.321 - - - 1,320K Subtotal: 10) OPC C4I - - 75.654 - - 5.974 - - 4.951 - - 12.890 - - - - - 12.890 Total - - 444.716 - - 49.523 - - 58.764 - - 67.106 - - - - - 67.106 10.8) MOS Mod 1,299K 2 1 - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 2 1 1 1.321 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) FY 2027 decrease attributed to Test and Integrated Logistics Support transition to sustainment upon delivery of the National Security Cutters to the United States Coast Guard. FY 2027 decrease attributed to IFF AIMS Support transition to NAVIAR FY 2027 decrease attributed to IFF AIMS Support transition to NAVIAR FY 2027 quantity decreased by two (2) for IFF AIMS Offshore Patrol Cutter (OPC) Equipment to avoid procuring ahead of United States Coast Guard In Yard Need Date FY 2027 quantity decreased by one (1) for MK 53 DLS Offshore Patrol Cutter (OPC) Equipment to avoid procuring ahead of United States Coast Guard In Yard Need Date LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 5 of 15 P-1 Line #91 Volume 2 - 841 === page 922 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 (6) (7) (8) (9) P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Aggregated Items Title: Coast Guard Equipment FY 2027 quantity increased by one (1) for MK 53 DLS Polar Security Cutter (PSC) to support the PSC in yard need date. No associated equipment installation costs are incurred as USCG will fund the installation of the C4I systems. The FY 2027 funding and quantity increase of two (2) Cryptography (CRYPTO) is due to updated In Yard Need Date (IYND) schedules. The FY 2027 funding and quantity increase of two (2) Command & Control Processor (C2P) is due to updated In Yard Need Date (IYND) schedules. (10) (11) (12) (13) The FY 2027 funding and quantity increase of twenty-four (24) ARC-210's due to the updated In Yard Need Date (IYND) schedules. The FY 2027 funding and quantity decrease of one (1) OE-570 Ultra High Frequency Satellite Communications (UHF SATCOM) Antenna System is due to Contractor Savings efficiencies. The FY 2027 funding and quantity decrease of one (1) NAVMACS is due to updated In Yard Need Date (IYND) schedules. The FY 2027 funding and quantity decrease of one (1) Multi-Functional Information Distribution (MIDS) On-Ship Modernization (MOS MOD) is due to updated In Yard Need Date (IYND) schedules. LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 6 of 15 P-1 Line #91 Volume 2 - 842 === page 923 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Method/Type or Funding Vehicle Aggregated Items: Coast Guard Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2022 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2022 Sep 2023 3 81,847.00 N 2023 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2023 Sep 2024 3 83,000.00 N 2024 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2024 Sep 2025 3 83,667.00 N 2025 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2025 Sep 2026 3 86,177.00 N 2026 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2026 Sep 2027 3 88,000.00 N 2027 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2027 Sep 2028 3 92,000.00 N 2.4) IFF EQUIPMENT/INCO SPARES OPC 2022 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2022 Sep 2023 2 527,277.00 N 2.4) IFF EQUIPMENT/INCO SPARES OPC 2023 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2023 Sep 2024 2 532,500.00 N 2022 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2022 Sep 2023 2 966,023.00 N 2023 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2023 Sep 2024 2 975,000.00 N 2024 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2024 Sep 2025 2 591,900.00 N 2025 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2025 Sep 2026 1 603,738.00 N 2026 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2026 Sep 2027 3 609,666.67 N 2027 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2027 Sep 2028 1 619,000.00 N 2022 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2022 Sep 2023 1 600,000.00 N 2024 NAVAIR NAWC/AD / ST. INIGOES, MD WR NAVAIR Mar 2024 Sep 2025 1 624,000.00 N (Each) RFP Issue Date 2) CG002 IFF AIMS 2.3) IFF AIMS EQUIPMENT FRC 2.3) IFF AIMS EQUIPMENT FRC 2.3) IFF AIMS EQUIPMENT FRC 2.3) IFF AIMS EQUIPMENT FRC 2.3) IFF AIMS EQUIPMENT FRC 2.3) IFF AIMS EQUIPMENT FRC 2.5) IFF AIMS EQUIPMENT OPC (4) 2.5) IFF AIMS EQUIPMENT OPC (4) 2.5) IFF AIMS EQUIPMENT OPC (4) 2.5) IFF AIMS EQUIPMENT OPC (4) 2.5) IFF AIMS EQUIPMENT OPC (4) 2.5) IFF AIMS EQUIPMENT OPC (4) 2.7) IFF AIMS EQUIPMENT PSC 2.7) IFF AIMS EQUIPMENT PSC 3) CG003 DECOYS MK 53 3.1) MK53 DLS OPC (5) 2022 Sechan Electronics, Inc / Lititz, PA C / FP NAVSEA Mar 2022 Dec 2023 2 585,710.00 Y 3.1) MK53 DLS OPC (5) 2023 Sechan Electronics, Inc / Lititz, PA C / FP NAVSEA Mar 2023 Dec 2024 2 615,000.00 Y 3.1) MK53 DLS OPC (5) 2024 Sechan Electronics, Inc / Lititz, PA C / FP NAVSEA Mar 2024 Dec 2025 2 621,150.00 Y LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 7 of 15 P-1 Line #91 Volume 2 - 843 === page 924 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 3620 / Coast Guard Equipment FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Coast Guard Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 3.1) MK53 DLS OPC (5) 2026 Sechan Electronics, Inc / Lititz, PA C / FFP NAVSEA Mar 2026 Dec 2027 2 627,500.00 Y 3.1) MK53 DLS OPC (5) 2027 Sechan Electronics, Inc / Lititz, PA C / FFP NAVSEA Mar 2027 Dec 2028 1 675,000.00 N 5.1) MK20 (EOSS) 2021 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Sep 2021 Sep 2023 2 1,822K Y Oct 2020 5.1) MK20 (EOSS) 2022 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Apr 2022 Apr 2024 2 1,790K Y Oct 2020 5.1) MK20 (EOSS) 2023 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Apr 2023 Apr 2025 1 2,078K Y Oct 2020 5.1) MK20 (EOSS) 2024 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Apr 2024 Apr 2026 1 2,414K Y Oct 2020 5.1) MK20 (EOSS) 2026 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Apr 2026 Apr 2028 1 2,679K Y Oct 2020 5.1) MK20 (EOSS) 2027 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Apr 2027 Apr 2029 1 2,747K Y Oct 2020 5.3) MK 46/MK 20 NSC 2021 L3 KEO / NORTHAMPTON, MA SS / FP NAVSEA Jul 2021 Jul 2023 1 1,822K Y Oct 2020 5) CG005 MK 46/MK 20 OPTICAL SIGHT 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM (†) 2022 SAAB USA / Syracuse, NY, USA C / FFP NAVSEA Jun 2022 Jul 2024 2 10,642K Y Oct 2016 7.1) MMR SYSTEM (†) 2023 SAAB USA / Syracuse, NY, USA C / FFP NAVSEA Mar 2023 Mar 2025 1 12,075K Y Feb 2021 7.1) MMR SYSTEM (†) 2024 SAAB USA / Syracuse, NY, USA C / FFP NAVSEA Mar 2024 Mar 2026 1 12,678K Y Feb 2021 7.1) MMR SYSTEM (†) 2025 SAAB USA / Syracuse, NY, USA C / FFP NAVSEA Mar 2025 Mar 2027 1 12,946K Y Jun 2022 7.1) MMR SYSTEM (†) 2026 SAAB USA / Syracuse, NY, USA C / FP NAVSEA Mar 2026 Mar 2028 1 15,953K Y Jun 2022 7.1) MMR SYSTEM (†) 2027 SAAB USA / Syracuse, NY, USA C / FP NAVSEA Mar 2027 Mar 2029 1 16,113K N Jun 2022 Global Technical Systems / Virginia Beach, VA C / FFP NAVSEA May 2022 May 2024 1 1,545K Y 2023 Immersion Consulting / Annapolis, MD C / FFP NAVSEA May 2023 May 2025 2 1,574K Y 2024 Red River Computer Co Inc / Chantilly, VA C / FFP NAVSEA May 2024 May 2026 2 1,603K Y 2025 Red River Computer Co Inc / Chantilly, VA C / FFP NAVSEA May 2025 May 2027 1 3,807K Y 2026 Red River Computer Co Inc / Chantilly, VA C / FFP NAVSEA May 2026 May 2028 1 3,845K Y 2027 Red River Computer Co Inc / Chantilly, VA C / FFP NAVSEA May 2027 May 2029 1 4,135K N 2025 NIWC LANT/General Dynamics / Taunton, MA WR NIWC LANT Jan 2025 Jan 2026 1 63,000.00 Y 2027 Raytheon / San Diego, Ca WR NIWC LANT Jan 2027 Jan 2028 2 66,250.00 Y 8) CG008 ATHENA CCD (†) 8.2) ATHENA TI-16 HW (†) 8.2) ATHENA TI-16 HW (†) 8.2) ATHENA TI-16 HW (†) 8.2) ATHENA TI-16 HW (†) 8.2) ATHENA TI-16 HW (†) 8.2) ATHENA TI-16 HW 2022 (14) 10) OPC C4I 10.1) CRYPTO (8) 10.1) CRYPTO (8) LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 8 of 15 P-1 Line #91 Volume 2 - 844 === page 925 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Item Number / Title [DODIC] 10.2) C2P (9) 10.2) C2P (9) FY Contractor and Location Method/Type or Funding Vehicle 2025 NIEF Contract (SERCO) / Herndon, VA C / CPFF Aggregated Items: Coast Guard Equipment Location of PCO Award Date Date of First Delivery NAVWAR Aug 2025 Aug 2027 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 1 1,198K Y 2027 NIEF Contract (SERCO) / Herndon, VA C / CPFF NAVWAR Aug 2027 Aug 2029 2 1,232K Y 10.3) ARC-210 (10) 2025 Collins Aerospace / Cedar Rapids, IA C / CPFF NAWCAD Jan 2025 Jul 2026 12 284,584.00 Y 10.3) ARC-210 (10) 2027 Collins Aerospace / Cedar Rapids, IA C / CPFF NAWCAD Jan 2027 Jul 2028 24 312,000.00 Y 10.4) OE-570D (11) 2026 Trivec Avant / Huntington Beach, CA C / CPFF NAVWAR Jun 2026 Jun 2027 2 596,500.00 Y 10.4) OE-570D (11) 2027 Trivec Avant / Huntington Beach, CA C / CPFF NAVWAR Jun 2027 Jun 2028 1 608,000.00 Y 2026 Collins Aerospace/ Cedar Rapids / NAWCAD C / FFP NAVWAR Jan 2026 Jan 2028 2 430,000.00 Y 2027 Collins Aerospace/ Cedar Rapids / NAWCAD C / FFP NAVWAR Jan 2027 Jan 2029 2 438,500.00 Y (12) 2026 General Dynamics / Taunton, MA C / FFP CECOM Mar 2026 Oct 2026 1 308,000.00 Y 10.8) MOS Mod (13) 2025 Viasat / Carlsbad, CA C / FFP NAVWAR Jul 2025 Jul 2027 1 1,298K Y 10.8) MOS Mod (13) 2026 DRS LAUREL TECHNOLOGIES / JOHNSTOWN, PA C / FFP NAVWAR Jul 2026 Jul 2028 2 1,295K Y 10.8) MOS Mod (13) 2027 DRS LAUREL TECHNOLOGIES / JOHNSTOWN, PA C / FFP NAVWAR Jul 2027 Jul 2029 1 1,320K Y 10.5) OA-9277A 10.5) OA-9277A 10.6) NAVMACs (†) O O C P-1 Line Item Number / Title: 3620 / Coast Guard Equipment RFP Issue Date indicates the presence of a P-21 Footnotes: (14) One ATHENA TI-16 Mod 1 CDP/NPS System consists of four separate components (three cabinets and one console), for which the individual manufacturer and lead times vary. Total system lead time 12 months. LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 9 of 15 P-1 Line #91 Volume 2 - 845 === page 926 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Coast Guard Equipment Fiscal Year 2021 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM Prior Years Deliveries: 8 11 2022 NAVY 2 0 2 11 2023 NAVY 1 0 1 A - - - - 2 1 11 2024 NAVY 1 0 1 1 11 2025 NAVY 1 0 1 1 11 2026 NAVY 1 0 1 1 11 2027 NAVY 1 0 1 1 8) CG008 ATHENA CCD 8.2) ATHENA TI-16 HW Prior Years Deliveries: 4 12 2022 NAVY 1 0 1 13 2023 NAVY 2 0 2 A - 2 14 2024 NAVY 2 0 2 2 14 2025 NAVY 1 0 1 1 14 2026 NAVY 1 0 1 1 14 2027 NAVY 1 0 1 - - - 1 1 O C T LI 3620 - Coast Guard Equipment Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #91 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 846 === page 927 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Coast Guard Equipment Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM Prior Years Deliveries: 8 11 2022 NAVY 2 0 2 11 2023 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - 1 - 1 - 0 11 2024 NAVY 1 0 1 1 A - - - - - - - 11 2025 NAVY 1 0 1 1 1 11 2026 NAVY 1 0 1 1 11 2027 NAVY 1 0 1 1 8) CG008 ATHENA CCD 8.2) ATHENA TI-16 HW Prior Years Deliveries: 4 12 2022 NAVY 1 0 1 13 2023 NAVY 2 0 2 - 14 2024 NAVY 2 0 2 14 2025 NAVY 1 0 1 1 14 2026 NAVY 1 0 1 1 14 2027 NAVY 1 0 1 - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - 1 0 - - - - - 2 A - - - - - 2 1 O C T LI 3620 - Coast Guard Equipment Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #91 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 847 === page 928 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Coast Guard Equipment Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM Prior Years Deliveries: 8 11 2022 NAVY 2 2 0 11 2023 NAVY 1 0 1 - - - - - 0 11 2024 NAVY 1 0 1 - - - - - 11 2025 NAVY 1 0 1 11 2026 NAVY 1 0 1 11 2027 NAVY 1 0 1 1 0 - - - - - - - - - - - - A - - - - - - - - - - - - 1 0 - - - - - - - 1 A - - - - - - - 1 1 8) CG008 ATHENA CCD 8.2) ATHENA TI-16 HW Prior Years Deliveries: 4 12 2022 NAVY 1 1 0 13 2023 NAVY 2 0 2 - - - - - - - 0 14 2024 NAVY 2 0 2 - - - - - - - 14 2025 NAVY 1 0 1 14 2026 NAVY 1 0 1 14 2027 NAVY 1 0 1 0 - - - - - - - - - - - - A - - - - - - - - - - - - 2 0 - - - - - 1 A - - - - - 1 1 O C T LI 3620 - Coast Guard Equipment Navy 2 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #91 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 848 === page 929 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Coast Guard Equipment Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM Prior Years Deliveries: 8 11 2022 NAVY 2 2 0 0 11 2023 NAVY 1 1 0 0 11 2024 NAVY 1 1 0 11 2025 NAVY 1 0 1 - - - - - 11 2026 NAVY 1 0 1 - - - - - 11 2027 NAVY 1 0 1 0 1 0 - - - - - - - - - - - - A - - - - - - - - - - - - 1 0 - - - - - - - 1 8) CG008 ATHENA CCD 8.2) ATHENA TI-16 HW Prior Years Deliveries: 4 12 2022 NAVY 1 1 0 0 13 2023 NAVY 2 2 0 0 14 2024 NAVY 2 2 0 14 2025 NAVY 1 0 1 - - - - - - - 14 2026 NAVY 1 0 1 - - - - - - - 14 2027 NAVY 1 0 1 0 O C T LI 3620 - Coast Guard Equipment Navy N O V D E C J A N F E B M A R A P R 1 0 - - - - - - - - - - - - A - - - - - - - - - - - - M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #91 M A R A P R 1 0 M A Y J U N J U L A U G S E P Volume 2 - 849 1 === page 930 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Coast Guard Equipment Fiscal Year 2029 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 7) CG007 MULTI-MODE RADAR 7.1) MMR SYSTEM Prior Years Deliveries: 8 11 2022 NAVY 2 2 0 0 11 2023 NAVY 1 1 0 0 11 2024 NAVY 1 1 0 0 11 2025 NAVY 1 1 0 0 11 2026 NAVY 1 1 0 11 2027 NAVY 1 0 1 0 - - - - - 1 0 8) CG008 ATHENA CCD 8.2) ATHENA TI-16 HW Prior Years Deliveries: 4 12 2022 NAVY 1 1 0 0 13 2023 NAVY 2 2 0 0 14 2024 NAVY 2 2 0 0 14 2025 NAVY 1 1 0 0 14 2026 NAVY 1 1 0 14 2027 NAVY 1 0 1 0 O C T LI 3620 - Coast Guard Equipment Navy N O V D E C J A N F E B M A R A P R 1 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #91 M A R A P R M A Y J U N J U L A U G S E P Volume 2 - 850 === page 931 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 3620 / Coast Guard Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 02 / 17 Aggregated Items: Coast Guard Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 3 12 3 25 28 6 3 24 27 0 0 12 12 0 0 12 12 0 0 24 24 0 0 24 24 0 0 24 24 0 0 24 24 1 SAAB USA - Syracuse, NY, USA 2 Global Technical Systems Virginia Beach, VA TBD 3 Immersion Consulting Annapolis, MD TBD 4 Red River Computer Co Inc Chantilly, VA TBD ALT After Oct 1 Reorder ALT Prior to Oct 1 Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3620 - Coast Guard Equipment Navy UNCLASSIFIED Page 15 of 15 P-1 Line #91 Volume 2 - 851 === page 932 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 2 - 852